  1. An approach for Periodic Safety Review (PSR) of units 5 and 6 of Kozloduy NPP

    Kichev, Emil

    2014-01-01

    Periodic Safety Reviews (PSR) is complementary to the routine and special safety reviews and does not replaced them. It determines the level of compliance with current safety requirements and covers all safety aspects of NPP operation and all equipment (SSCs) on site. Three levels of importance are defined for the documents in PSR (towards higher conservatism): Bulgarian documents; IAEA documents; Documents of manufactures and suppliers of the equipment (SSCs). The scope and activities consists of four stages and includes 14 safety factors (SF). Cooperation with external companies and organizations in areas with proved experience is used.

  2. Research on the maximum utilization of PSR (Periodic Safety Review) results

    Shin, Tae Myung; Lee, Jae Kyung; Ahn, Jin Chul; Kim, G. U.; Ryu, Y. S.; Lee, G. B.; Park, D. H. [Chungju Univ., Cheongju (Korea, Republic of)

    2002-03-15

    This is the final report of 'research on the maximum utilization of PSR results' focused on linkage strategy of PSR with continued operation over design life of operating NPP. Study was mace mainly on the analysis of current status of continued operation over plant design life in foreign countries, analysis of domestic PSR implementation status and establishment of basic strategy for linking PSR with continued operation. The results of the study performed so far can be summarized as below, the recent worldwide trend of promoting efficiency of NPP operation is focused on life extension of the plants rather than building of new. Considering the fact that some developed countries have already implemented the plant life extension and not a few countries at least have invested a good amount of fund for R and D of plant life management, we can not disregard the owner's request for review of life extension application without any reasonable description. As a result of investigation and analysis for the current status of continued operation over plant design life in foreign countries, it is concluded that most countries tend to link PSR with continued operation over plant design life and the extended operation has already been implemented in some developed countries. From the point, it turned out to be more desirable to couple those two systems for continued operation over plant design life of Korean NPP. A less than 7 years left until the end of design life for the oldest NPP Kori unit 1, it is strongly recommended to establish institutional frame including a legal basis and regulatory guidelines for continued operation over plant design life before long. For the prioritization methods of corrective actions in consideration of safety significance of shortcomings picked up from PSR, some related systems are reviewed including IAEA guidelines, PSR implementation experience of UK and US prioritization system for GSI (Generic Safety Issue). Basic principles are

  3. Research on review technology for three key safety factors of periodic safety review (PSR) and its application to Qinshan Nuclear Power Plant

    Xu Shoulv; Yao Weida; Dou Yikang; Lin Shaoxuan; Cao Yenan; Zhou Quanfu; Zheng Jiong; Zhang Ming

    2009-04-01

    In 2001, after 10 years' operation, Qinshan Nuclear Power Plant (Q1) started to carry out periodic safety review (PSR) based on a nuclear safety guideline, Periodic Safety Review for Operational Nuclear Power Plants (HAF0312), issued by National Nuclear Safety Administration of China (NNSA). Entrusted by the owner of Q1, Shanghai Nuclear Engineering Research and Design Institute (SNERDI) implemented reviews of three key safety factors including safety analysis, equipment qualification and ageing. PSR was a challenging work in China at that time and through three years' research and practice, SNERDI summarized a systematic achievement for the review including review methodology, scoping, review contents and implementation steps, etc.. During the process of review for the three safety factors, totally 148 review reports and 341 recommendations for corrections were submitted to Q1. These reports and recommendations have provided guidance for correction actions as follow-up of PSR. This paper focuses on technical aspects to carry out PSR for the above-mentioned three safety factors, including review scoping, contents, methodology and main steps. The review technology and relevant experience can be taken for reference for other NPPs to carry out PSR. (authors)

  4. Experience with Periodic Safety Review (PSR) at Kozloduy NPP after 20 years of operation

    Popov, V.

    2011-01-01

    Conclusion: Measures in the long-term Programs for improving safety and radiation protection of unit 5&6, based on PSR outcome and addressed on the units’ operation licence renewal are under way. • NPP Kozloduy intends to fulfils requirements on modern nuclear power plants which occasionally exceeds limits of the effective national nuclear legislation

  5. Methods and Effects of Safety Enhancement in Korean PSR

    Kim, Young Gab; Park, Jong Woon

    2009-01-01

    Periodic Safety Review (PSR) is a comprehensive study on a nuclear power plant safety, taking into account aspects such as operational history, ageing, safety analyses and advances in code and standards since the time of construction. In Korea, PSRs have been performed for 20 units and have been effectively used to obtain an overall view of actual plant safety to determine reasonable and practical modifications that should be made in order to obtain a higher level of safety approaching that of modern plants. Among many safety enhancements achieved from Korean PSRs, new safety analyses are the important methods to confirm plant safety by increasing safety margin for specific safety issues. Methods and effects of safety enhancements applied in Korean PSRs are reviewed in this paper in light of new safety analyses to obtain additional safety margins

  6. Regulatory review of NPP Krsko Periodic Safety Review

    Lovincic, D.; Muehleisen, A.; Persic, A.

    2004-01-01

    At the request of the Slovenian Nuclear Safety Administration (SNSA), Krsko NPP prepared a Periodic Safety Review (PSR) program in January 2001. This is the first PSR of NPP Krsko, the only nuclear power plant in Slovenia. The program was reviewed by the IAEA mission in May 2001 and approved by SNSA in July 2001. The program is made in accordance with the IAEA Safety Guide 'Periodic Safety Review of Operational Nuclear Power Plants' No. 50-SG-012 and with European practice. It contains a systematic review of operation of the NPP Krsko, including the review of the changes as a result of the modernization of the facility. The main tasks of PSR are review of plant status for each safety factor, development of aging and life cycle management program, review of seismic design and PSHA analysis and update of regulatory compliance program. The prioritization process of findings and action plan are also important tasks of PSR. The basic safety factors of the PSR review are: Operational Experience, Safety Assessment and Analyses, Equipment Qualification and Ageing Management, Safety Culture, Emergency Planing, Environmental Impact and Radioactive Waste, Compliance with license requirements and Prioritization. It had been agreed that SNSA will have reviewed all PSR reports generated during the PSR process. At the end of 2003 the PSR Summary Report with selected recommendations for action plan was completed and delivered to SNSA for review. The paper presents regulatory review of NPP Krsko PSR with emphasis on the evaluation of the PSR issues ranking process. (author)

  7. SSR: What's in "School Science Review" for "PSR" Readers?

    Lakin, Liz

    2004-01-01

    This article summarises ideas and developments in teaching and learning in science of relevance to "Primary Science Review" ("PSR") readers from three recent issues (309, 310, and 311) of "School Science Review" ("SSR"), the ASE journal for science education 11-19. The themes running through these are: ICT, the implications for science education…

  8. Periodic safety reviews of nuclear power plants

    Toth, Csilla

    2009-01-01

    Operational nuclear power plants (NPPs) are generally subject to routine reviews of plant operation and special safety reviews following operational events. In addition, many Member States of the International Atomic Energy Agency (IAEA) have initiated systematic safety reassessment, termed periodic safety review (PSR), to assess the cumulative effects of plant ageing and plant modifications, operating experience, technical developments, site specific, organizational and human aspects. These reviews include assessments of plant design and operation against current safety standards and practices. PSRs are considered an effective way of obtaining an overall view of actual plant safety, to determine reasonable and practical modifications that should be made in order to maintain a high level of safety throughout the plant's operating lifetime. PSRs can be used as a means to identify time limiting features of the plant. The trend is to use PSR as a condition for deciding whether to continue operation of the plant beyond the originally established design lifetime and for assessing the status of the plant for long term operation. To assist Member States in the implementation of PSR, the IAEA develops safety standards, technical documents and provides different services: training courses, workshops, technical meetings and safety review missions for the independent assessment of the PSR at NPPs, including the requirements for PSR, the review process and the PSR final reports. This paper describes the PSR's objectives, scopes, methods and the relationship of PSR with other plant safety related activities and recent experiences of Member States in implementation of PSRs at NPPs. (author)

  9. Domestic Regulation for Periodic Safety Review of Nuclear Power Plants

    Kim, Daesik; Ahn, Seunghoon; Auh, Geunsun; Lee, Jonghyeok

    2015-01-01

    The so-called Periodic Safety Review (PSR) has been carried out such safety assessment throughout its life, on a periodic basis. In January 2001, the Atomic Energy Act and related regulations were amended to adopt the PSR institutional scheme from IAEA Nuclear Safety Guide 50-SG-O12. At that time the safety assessment was made to review the plant safety on 10 safety factors, such as aging management and emergency planning, where the safety factor indicates the important aspects of safety of an operating NPP to be addressed in the PSR. According to this legislation, the domestic utility, the KHNP has conducted the PSR for the operating NPP of 10 years coming up from operating license date, starting since May 2000. Some revisions in the PSR rule were made to include the additional safety factors last year. This paper introduces the current status of the PSR review and regulation, in particular new safety factors and updated technical regulation. Comprehensive safety assessment for Korea Nuclear Power Plants have performed a reflecting design and procedure changes and considering the latest technology every 10 years. This paper also examined the PSR system changes in Korea. As of July 2015, reviews for PSR of 18 units have been completed, with 229 nuclear safety improvement items. And implementation have been completed for 165 of them. PSR system has been confirmed that it has contributed to improvement of plant safety. In addition, this paper examined the PSR system change in Korea

  10. Development of Safety Review Guide for the Periodic Safety Review of Reactor Vessel Internals

    Park, Jeongsoon; Ko, Hanok; Kim, Seonjae; Jhung, Myungjo

    2013-01-01

    Aging management of the reactor vessel internals (RVIs) is one of the important issues for long-term operation of nuclear power plants (NPPs). Safety review on the assessment and management of the RVI aging is conducted through the process of a periodic safety review (PSR). The regulatory body should check that reactor facilities sustain safety functions in light of degradation due to aging and that the operator of a nuclear power reactor establishes and implements management program to deal with degradation due to aging in order to guarantee the safety functions and the safety margin as a result of PSR. KINS(Korea Institute of Nuclear Safety) has utilized safety review guides (SRG) which provide guidance to KINS staffs in performing safety reviews in order to assure the quality and uniformity of staff safety reviews. The KINS SRGs for the continued operation of pressurized water reactors (PWRs) published in 2006 contain areas of review regarding aging management of RVIs in chapter 2 (III.2.15, Appendix 2.0.1). However unlike the SRGs for the continued operation, KINS has not officially published the SRGs for the PSR of PWRs, but published them as a form of the research report. In addition to that, the report provides almost same review procedures for aging assessment and management of RVIs with the ones provided in the SRGs for the continued operation, it cannot provide review guidance specific to PSRs. Therefore, a PSR safety review guide should be developed for RVIs in PWRs. In this study, a draft PSR safety review guide for reactor vessel internals in PWRs is developed and provided. In this paper, a draft PSR safety review guide for reactor vessel internals (PSR SRG-RVIs) in PWRs is introduced and main contents of the draft are provided. However, since the PSR safety review guides for areas other than RVIs in the pressurized water reactors (PWRs) are expected to be developed in the near future, the draft PSR SRG-RVIs should be revisited to be compatible with

  11. Current Status of Periodic Safety Review of HANARO Research Reactor

    Kim, Minjin; Ahn, Guk-Hoon; Lee, Choong Sung [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    A PSR for a research reactor became a legal requirement as the Nuclear Safety Act was amended and came into effect in 2014. This paper describes the current status and methodology of the first Periodic Safety Review (PSR) of HANARO that is being performed. The legal requirements, work plan, and process of implementing a PSR are described. Because this is the first PSR for a research reactor, it is our understating that the operating organization and regulatory body should communicate well with each other to complete the PSR in a timely manner. The first PSR of HANARO is under way. In order to achieve a successful result, activities of the operation organization such as scheduling, maintaining consistency in input data for review, and reviewing the PSR reports that will require intensive resources should be well planned. This means the operating organization needs to incorporate appropriate measures to ensure the transfer of knowledge and expertise arising from the PSR via a contractor to the operation organization. It is desirable for the Regulatory Body to be involved in all stage of the PSR to prevent any waste of resources and minimize the potential for a reworking of the PSR and the need for an additional assessment and review as recommended by foreign experts.

  12. NPP Krsko periodic safety review. Safety assessment and analyses

    Basic, I.; Spiler, J.; Thaulez, F.

    2002-01-01

    Definition of a PSR (Periodic Safety Review) project is a comprehensive safety review of a plant after ten years of operation. The objective is a verification by means of a comprehensive review using current methods that the plant remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. The overall goals of the NEK PSR Program are defined in compliance with the basic role of a PSR and the current practice typical for most of the countries in EU. This practice is described in the related guides and good practice documents issued by international organizations. The overall goals of the NEK PSR are formulated as follows: to demonstrate that the plant is as safe as originally intended; to evaluate the actual plant status with respect to aging and wear-out identifying any structures, systems or components that could limit the life of the plant in the foreseeable future, and to identify appropriate corrective actions, where needed; to compare current level of safety in the light of modern standards and knowledge, and to identify where improvements would be beneficial for minimizing deviations at justifiable costs. The Krsko PSR will address the following safety factors: Operational Experience, Safety Assessment, EQ and Aging Management, Safety Culture, Emergency Planning, Environmental Impact and Radioactive Waste.(author)

  13. Krsko periodic safety review project prioritization process

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  14. Periodic safety review of the HTR-10 safety analysis

    Chen Fubing; Zheng Yanhua; Shi Lei; Li Fu

    2015-01-01

    Designed by the Institute of Nuclear and New Energy Technology (INET) of Tsinghua University, the 10 MW High Temperature Gas-cooled Reactor-Test Module (HTR-10) is the first modular High Temperature Gas-cooled Reactor (HTGR) in China. According to the nuclear safety regulations of China, the periodic safety review (PSR) of the HTR-10 was initiated by INET after approved by the National Nuclear Safety Administration (NNSA) of China. Safety analysis of the HTR-10 is one of the key safety factors of the PSR. In this paper, the main contents in the review of safety analysis are summarized; meanwhile, the internal evaluation on the review results is presented by INET. (authors)

  15. Study on the correlation of PSR with extended operation of NPP

    Shin, T. M.; Kim, H. K.; Cho, J. C.; Kim, H. J.

    2002-01-01

    For developed countries, which had already experienced the end of nuclear plant design life, it has been a trend to allow extended operation of plant in case that safety during the period of extended operation is ensured through safety assessment. Periodic Safety Review and License Renewal are the widely used system for safety assessment of extended operation. The PSR has been already adopted in our country and actively carried out one by one for each operating plant by the owner and its committed technical experts. In the paper, the interfaces between PSR and extended operation are reviewed in the regulatory viewpoint in recognition that various safety reviews are performed in PSR for the safety confirmation and enhancement, and that PSR can be effectively utilized for the review of extended operation. However, this study has been performed only on the research purpose and thus the final decision is up to the policy of government

  16. Regulatory Aspect of Periodic Safety Review Performed in Nuclear Power Plants in the Slovak Republic

    Baszo, Z.

    2010-01-01

    The paper deals with the regulatory aspect of Nuclear Power Plant (NPP) Periodic Safety Review (PSR) as a part of license renewal process in the Slovak Republic. It summarizes the history of activities similar to PSR performed in the past for NPPs operated in the Slovak Republic. Furthermore, it describes both the requirements involved in the current Slovak legislation to be met by licensee in the Slovak Republic in this field and the procedures concerning the PSR as well. The objective and rules of PSR to be performed for NPPs in the Slovak Republic were derived from the internationally accepted International Atomic Energy Agency (IAEA) document and have been implemented into national legislation. PSR of two twin units located in Bohunice NPP and Mochovce NPP, respectively, has been initiated in the Slovak Republic based on evaluation of each area to be reviewed (safety factors) using recent methodology and practice. Other significant factors, such as ageing, modifications of NPP and the safe operation for a specified future period, have to be assessed in the frame of PSR. Report on performed PSR outlines the results of review for each area, the corrective plan, which considering mutual relations between assessed areas specifies the issues to be solved with the aim to eliminate shortcomings identified in the frame of PSR and to adopt safety improvements. The findings from PSR in the evaluated areas also serve as a source of information for updating of all documents to be attached to the written application of licensee for renewal of a nuclear power plant operating license. The presented procedure describes how the Nuclear Regulatory Authority of the Slovak Republic (UJD SR) has reviewed the documents submitted during PSR. Based on results of submitted documents evaluation and licensee application for license renewal the license for next 10 years operation has been issued for Bohunice NPP. At present, similar procedure for Mochovce NPP unit 1 and 2 is underway.(author).

  17. Preparation of NPP Dukovany periodic safety review

    Dubsky, L.; Vymazal, P.

    2004-01-01

    Dukovany NPP in Czech Republic performs a periodic safety review for the second time after approximately 20 years of operation. The history of the Safety Report and its transformation into an internationally accepted form complying with IAEA standards is described. The deterministic and probabilistic assessment of the plant's safety-related design and state is applied to determine whether and to what extend the relevant protective goals are fulfilled by the existing plant design. A description of the step-by-step process is presented together with the creation of methods and criteria for PSR evaluation prepared by Nuclear Research Institute Rez

  18. Krsko NPP Periodic Safety Review program

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  19. Revision of AESJ standard 'the code of implemnetation of periodic safety review of nuclear power plants'

    Hirano, Masashi; Narumiya, Yoshiyuki

    2010-01-01

    The Periodic Safety Review (PSR) was launched in June 1992, when the Agency for Natural Resources and Energy issued a notification that required licensees to conduct comprehensive review on the safety of each existing nuclear power plant (NPP) once approximately every ten years based on the latest technical findings for the purpose of improving the safety of the NPP. In 2006, the Standard Committee of the Atomic Energy Society of Japan established the first version of 'The Standard of Implementation for Periodic Safety Review of Nuclear Power Plants: 2006'. Taking into account developments in safety regulation of PSR after the issuance of the first version, the Standard Committee has revised the Standard. This paper summarizes background on PSR, such developments are major contents of the Standard as well as the focal points of the revision. (author)

  20. Periodic safety review of operational nuclear power plants. A publication within the NUSS programme

    1994-01-01

    This Safety Guide which supplements the IAEA Safety Fundamentals: The Safety of Nuclear Installations and the Code on the Safety of Nuclear Power Plants: Operation, forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes and Guides relating to nuclear power plants. A list of NUSS publications is given at the end of this book. This Guide was drafted on the basis of a systematic review approach that was endorsed by the IAEA Conference on the Safety of Nuclear Power: Strategy for the Future. The purpose of this Safety Guide is to provide guidance on the conduct of Periodic Safety Reviews (PSRs) for an operational nuclear power plant. The Guide is directed at both owners/operators and regulators. This Safety Guide deals with the PSR of an operational nuclear power plant. A PSR is a comprehensive safety review addressing all important aspects of safety, carried out at regular intervals. 22 refs, 4 figs

  1. A study of adopting maintenance rule under the periodic safety review and reliability centered maintenance program

    Kilyoo, Kim

    2001-01-01

    U.S Maintenance Rule (MR) has three main functions. One is to monitor the performance changes of SSCs (Structure, System, and Component) caused by risk informed applications. Periodic Safety Review (PSR) program is widely adopted in Europe while it is not adopted in U. S. A where MR and new oversight program are instead used. Recently, in Korea, it was determined to adopt PSR, and the first PSR program has started this year for Kori unit 1 as a pilot plant. Also, a traditional Reliability Centered Maintenance (RCM) has been performed for 4 systems of YGN unit 1 and 2 and it will be applied to the other nuclear power plants in Korea. However, since MR is adopting many useful concept of RCM, traditional RCM could not be further performed without being associated with MR. Thus, MR, RCM and PSR have recently become hot issue policies which should be well associated each other in Korea, and this paper suggests a desirable new maintenance process which would embrace the concepts of the three policies, and also discusses whether U.S. MR is necessary even though a PSR program is already adopted, and if necessary, then how cost-effectively it can be introduced to. (author)

  2. Technical Letter Report: Evaluation and Analysis of a Few International Periodic Safety Review Summary Reports

    Chopra, Omesh K. [Argonne National Lab., IL (United States). Environmental Science Division; Diercks, Dwight R. [Argonne National Lab., IL (United States). Nuclear Engineering Division; Ma, David Chia-Chiun [Argonne National Lab., IL (United States). Environmental Science Division; Garud, Yogendra S. [Argonne National Lab., IL (United States). Environmental Science Division

    2013-12-17

    At the request of the United States (U.S.) government, the International Atomic Energy Agency (IAEA) assembled a team of 20 senior safety experts to review the regulatory framework for the safety of operating nuclear power plants in the United States. This review focused on the effectiveness of the regulatory functions implemented by the NRC and on its commitment to nuclear safety and continuous improvement. One suggestion resulting from that review was that the U.S. Nuclear Regulatory Commission (NRC) incorporate lessons learned from periodic safety reviews (PSRs) performed in other countries as an input to the NRC’s assessment processes. In the U.S., commercial nuclear power plants (NPPs) are granted an initial 40-year operating license, which may be renewed for additional 20-year periods, subject to complying with regulatory requirements. The NRC has established a framework through its inspection, and operational experience processes to ensure the safe operation of licensed nuclear facilities on an ongoing basis. In contrast, most other countries do not impose a specific time limit on the operating licenses for NPPs, they instead require that the utility operating the plant perform PSRs, typically at approximately 10-year intervals, to assure continued safe operation until the next assessment. The staff contracted with Argonne National Laboratory (Argonne) to perform a pilot review of selected translated PSR assessment reports and related documentation from foreign nuclear regulatory authorities to identify any potential new regulatory insights regarding license renewal-related topics and NPP operating experience (OpE). A total of 14 PSR assessment documents from 9 countries were reviewed. For all of the countries except France, individual reports were provided for each of the plants reviewed. In the case of France, three reports were provided that reviewed the performance assessment of thirty-four 900-MWe reactors of similar design commissioned between 1978

  3. Technical Letter Report: Evaluation and Analysis of a Few International Periodic Safety Review Summary Reports

    Chopra, Omesh K.; Diercks, Dwight R.; Ma, David Chia-Chiun; Garud, Yogendra S.

    2013-01-01

    At the request of the United States (U.S.) government, the International Atomic Energy Agency (IAEA) assembled a team of 20 senior safety experts to review the regulatory framework for the safety of operating nuclear power plants in the United States. This review focused on the effectiveness of the regulatory functions implemented by the NRC and on its commitment to nuclear safety and continuous improvement. One suggestion resulting from that review was that the U.S. Nuclear Regulatory Commission (NRC) incorporate lessons learned from periodic safety reviews (PSRs) performed in other countries as an input to the NRC's assessment processes. In the U.S., commercial nuclear power plants (NPPs) are granted an initial 40-year operating license, which may be renewed for additional 20-year periods, subject to complying with regulatory requirements. The NRC has established a framework through its inspection, and operational experience processes to ensure the safe operation of licensed nuclear facilities on an ongoing basis. In contrast, most other countries do not impose a specific time limit on the operating licenses for NPPs, they instead require that the utility operating the plant perform PSRs, typically at approximately 10-year intervals, to assure continued safe operation until the next assessment. The staff contracted with Argonne National Laboratory (Argonne) to perform a pilot review of selected translated PSR assessment reports and related documentation from foreign nuclear regulatory authorities to identify any potential new regulatory insights regarding license renewal-related topics and NPP operating experience (OpE). A total of 14 PSR assessment documents from 9 countries were reviewed. For all of the countries except France, individual reports were provided for each of the plants reviewed. In the case of France, three reports were provided that reviewed the performance assessment of thirty-four 900-MWe reactors of similar design commissioned between 1978 and

  4. Nuclear Safety Review 2013

    NONE

    2013-07-15

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis.

  5. Nuclear Safety Review 2013

    2013-07-01

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis

  6. KHNP special safety review

    Lee, Tae-Ho; Lee, Bang-Jin; Lee, Soung-Hee; Park, Goon-Cherl

    2009-01-01

    Commemorating the 30 year anniversary of commercial nuclear power plant operation in KOREA, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) has conducted a Special Safety Review (SSR) of its 20 operating units to understand their safety performance and to identify any areas that need improvement. The SSR reviewed all 20 operating units for 2 weeks per site. Areas that were reviewed are Safety Margins, Plant Performance, Employee Safety, Employee Performance and Performance Improvement Process. Each review team consisted of international and domestic members. The international reviewers were from IAEA, WANO and INPO. The domestic reviewers consisted of professors, Engineering Company, Research Institute and KHNP experts. The review confirmed safe and reliable operations of the 20 nuclear units. The common understanding resulted from the SSR is as follows. Firstly, KHNP corporate and its plants confirmed and shared mutual understanding on recurring areas for improvements, especially in the areas of Organizational Effectiveness, Industrial Safety, Human Performance, Configuration Management, Operations, Equipment Performance and Material Condition. Secondly, KHNP understood that plant and department level performances are directly related to the leadership and competency of the management team including supervisors. Thirdly, the strengths of individual stations that consistently have produced good results need to be shared with the other KHNP stations. Finally, KHNP learned that strong corporate leadership and support are needed to resolve most of the areas for improvement since they are common to all KHNP stations. (author)

  7. Lift truck safety review

    Cadwallader, L.C.

    1997-03-01

    This report presents safety information about powered industrial trucks. The basic lift truck, the counterbalanced sit down rider truck, is the primary focus of the report. Lift truck engineering is briefly described, then a hazard analysis is performed on the lift truck. Case histories and accident statistics are also given. Rules and regulations about lift trucks, such as the US Occupational Safety an Health Administration laws and the Underwriter's Laboratories standards, are discussed. Safety issues with lift trucks are reviewed, and lift truck safety and reliability are discussed. Some quantitative reliability values are given

  8. Lift truck safety review

    Cadwallader, L.C.

    1997-03-01

    This report presents safety information about powered industrial trucks. The basic lift truck, the counterbalanced sit down rider truck, is the primary focus of the report. Lift truck engineering is briefly described, then a hazard analysis is performed on the lift truck. Case histories and accident statistics are also given. Rules and regulations about lift trucks, such as the US Occupational Safety an Health Administration laws and the Underwriter`s Laboratories standards, are discussed. Safety issues with lift trucks are reviewed, and lift truck safety and reliability are discussed. Some quantitative reliability values are given.

  9. ENSI's technical view on the periodic safety review 2008 of the nuclear power plant Goesgen

    2012-08-01

    The owner of a license for a nuclear power plant operation in Switzerland has to undergo every 10 years a comprehensive safety check called 'periodic safety review' (PSR). The regulatory authority, the Swiss Federal Nuclear Safety Inspectorate (ENSI), reviews the documents supplied by the licensee. The Goesgen power plant (KKG) obtained its operation license and started operation in 1978. A first PSR was performed in the years 1996 to 1998 (PSR 1998) and reported. KKG delivered an analysis of the safety status, an evaluation of subsystems as well as test reports. The new PSR covers the period 1998 to 2007. The basis of the evaluation by ENSI is the new nuclear energy law in force since 1 February 2005. In comparison to PSR 1998, new aspects have to be considered like the description of the safety concept, including the technical safety classification of buildings, systems and components, or consideration of the protection objective 'limitation of the radiation exposure'. The PSR 2008 is focussed on the estimate of the nuclear safety of KKG. Basically, for the operation of a nuclear power plant, a sufficient protection has to be guaranteed against the release of radioactive materials to the environment as well as the irradiation of persons, during normal operation as well as in the case of accidents. The licensee of a nuclear power plant in operation must retrofit his plant according to the experience already gained and the state-of-the-art. The purpose of the PSR is to check the quality of the plant in the domain of safety. A probabilistic safety assessment (PSA) study must prove that the probability of damages to the reactor core is smaller than 10 -5 /year. In Switzerland the life time of a nuclear power plant is not limited by a fixed maximum time of operation. On the contrary, the limitation proceeds from safety criteria. Insufficiencies in the plant design are often recognized only through the evolution of the technique or some unexpected events. Ageing

  10. Safety review advisor

    Boshers, J.A.; Uhrig, R.E.; Alguindigue, I.A.; Burnett, C.G.

    1991-01-01

    The University of Tennessee's Nuclear Engineering department, in cooperation with the Tennessee Valley Authority (TVA), is evaluating the feasibility of utilizing an expert system to aid in 10CFR50.59 evaluations. This paper discusses the history of 10CFR50.59 reviews, and details the development approach used in the construction of a prototype Safety Review Advisor (SRA). The goals for this expert system prototype are to aid the engineer in the evaluation process by directing his attention to the appropriate critical issues, increase the efficiency, consistency, and thoroughness of the evaluation process, and provide a foundation of appropriate Safety Analysis Report (SAR) references for the reviewer

  11. Human factors evaluation of man-machine interface for periodic safety review of nuclear power plants

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang; Hwang, In Koo; Lee, Hyun Cheol; Jang, Tong Il; Ku, Jin Young; Kim, Soo Jin

    2004-12-01

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Nuclear Power Plants(NPPs). As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area

  12. Review of PSR framework and development of a DPSIR model to assess greenhouse effect in Taiwan.

    Huang, Hui-Fen; Kuo, Jeff; Lo, Shang-Lien

    2011-06-01

    In dealing with the complex issues of greenhouse gas (GHG) emission and climate change mitigation, many interrelated factors such as cost, level of technology development, supply and demand of energy, structure of industry, and expenditures on research and development exist. Using indicators to monitor environmental impacts and evaluate the efficacies of policies and regulations has been practiced for a long time, and it can serve as a useful tool for decision making and for comparison between different countries. Although numerous indicators have been developed for relevant subjects, integrated approaches that consider individual changes, dynamic interaction, and multi-dimensions of indicators are scarce. This paper aimed to develop a Driving Force-Pressure-State-Impact-Response (DPSIR) framework to assess the problems. This DPSIR model is mainly related to energy consumption, environmental impacts, and policy responses. The objectives of the paper were: (1) conduct a literature review on the indicators that have been used in GHG-related studies; (2) develop a DPSIR model that incorporates GHG-related indicators and evaluate their relationships using a cause-effect chain of GHG emission; and (3) develop a calculative method that can be used to explain the dynamic correlation among the interdependent indicators. Taiwan is a significant source of global GHG emissions. A case study, using the developed framework and Taiwan's actual data of the past two decades, was conducted. The results indicate that regulatory strategies for pollution control are inadequate in terms of ensuring environmental quality, and the nature does not have the capability to revert the impacts from the existing level of pollution.

  13. An Evaluation of the Physical Environments of a Nuclear Power Plants for Human Factors Review in Periodic Safety Review

    Kim, Dae Ho; Lee, Yong Hee

    2006-01-01

    Currently, operation of a nuclear power plants(NPP) is highly emphasized by the integrity of the H/W and the human factors security, so the periodic safety review(PSR) is performed to NPP. The PSR activities on human factors include physical environments (illumination, noise, vibration, temperature and humidity etc). The review on these physical environments is to verify the possible affect to the human error during the operation of the man machine interface. Physical environments affect the health, job stress and job satisfaction of NPP's employees. On the ground of the reason, we need integrating the management program for the sufficient satisfaction of the regulatory basis and standards of physical environment and considering a health, a job stress and satisfaction of NPP's employees. So, this paper describes the planning of the setup procedures of physical environments and the adequate management program for the field applications in NPPs

  14. An Evaluation of the Physical Environments of a Nuclear Power Plants for Human Factors Review in Periodic Safety Review

    Kim, Dae Ho; Lee, Yong Hee [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    2006-07-01

    Currently, operation of a nuclear power plants(NPP) is highly emphasized by the integrity of the H/W and the human factors security, so the periodic safety review(PSR) is performed to NPP. The PSR activities on human factors include physical environments (illumination, noise, vibration, temperature and humidity etc). The review on these physical environments is to verify the possible affect to the human error during the operation of the man machine interface. Physical environments affect the health, job stress and job satisfaction of NPP's employees. On the ground of the reason, we need integrating the management program for the sufficient satisfaction of the regulatory basis and standards of physical environment and considering a health, a job stress and satisfaction of NPP's employees. So, this paper describes the planning of the setup procedures of physical environments and the adequate management program for the field applications in NPPs.

  15. Safety review advisor

    Boshers, J.A.; Alguindigue, I.E.; Uhrig, R.E.

    1989-01-01

    The University of Tennessee's Nuclear Engineering Department, in cooperation with the Tennessee Valley Authority (TVA), is evaluating the feasibility of utilizing an expert system to aid in 10CFR50.59 evaluations. This paper discusses the history of 10CFR50.59 reviews, and details the development approach used in the construction of a prototype Safety Review Advisor (SRA). The goals for this expert system prototype are to (1) aid the engineer in the evaluation process by directing his attention to the appropriate critical issues, (2) increase the efficiency, consistency, and thoroughness of the evaluation process, and (3) provide a foundation of appropriate Safety Analysis Report (SAR) references for the reviewer. 6 refs., 2 figs

  16. Aging evaluation methodology of periodic safety review in Korea

    Park, Heung-Bae; Jung, Sung-Gyu; Jin, Tae-Eun; Jeong, Ill-Seok

    2002-01-01

    In Korea plant lifetime management (PLIM) study for Kori Unit 1 has been performed since 1993. Meanwhile, periodic safety review (PSR) for all operating nuclear power plants (NPPs) has been started with Kori Unit 1 since 2000 per IAEA recommendation. The evaluation period is 10 years, and safety (evaluation) factors are 11 per IAEA guidelines as represented in table 1. The relationship between PSR factors and PLIM is also represented. Among these factors evaluation of 'management of aging' is one of the most important and difficult factor. This factor is related to 'actual condition of the NPP', 'use of experience from other nuclear NPPs and of research findings', and 'management of aging'. The object of 'management of aging' is to obtain plant safety through identifying actual condition of system, structure and components (SSCs) and evaluating aging phenomena and residual life of SSCs using operating experience and research findings. The paper describes the scope and procedure of valuation of 'management of aging', such as, screening criteria of SSCs, Code and Standards, evaluation of SSCs and safety issues as represented. Evaluating SSCs are determined using final safety analysis report (FSAR) and power unit maintenance system for Nuclear Ver. III (PUMAS/N-III). The screening criteria of SSCs are safety-related items (quality class Q), safety-impact items (quality class T), backfitting rule items (fire protection (10CFR50.48), environmental qualification (10CFR50.49), pressurized thermal shock (10CFR50.61), anticipated transient without scram (10CFR50.62), and station blackout (10CFR50.63)) and regulating authority requiring items[1∼3]. The purpose of review of Code and Standards is identifying actual condition of the NPP and evaluating aging management using effective Code and Standards corresponding to reactor facilities. Code and Standards is composed of regulating laws, FSAR items, administrative actions, regulating actions, agreement items, and other

  17. Study on the Correlation between PSR and Korean Stress Test for Continued Operation of Aging NPP

    Chung, June Ho; Kim, Tae Ryong

    2013-01-01

    Nuclear Safety and Security Commission (NSSC), Korean nuclear regulatory authority established the stress test guideline based on the EU stress test, and KHNP prepared the execution plan in response to the guideline for the CO of Kori Unit 1 and Wolsong Unit 1. PSR is a comprehensive safety review program for long term operation of NPP, which was developed by IAEA. Korea adopted PSR in 1999 as the regulatory requirement for CO of NPP. The IAEA standard guideline for PSR program was updated in 2003. However, the Korean PSR has not been revised yet to apply the new IAEA guidelines. Additionally, national legal systems and guidelines associated with the adoption of stress tests are urgently required as well. These revisions are imperative in order to ensure the reliability of NPPs, and to promote public acceptance and understanding. This study presents the technical basis and proposals for review actions necessary to address the issues and controversies surrounding the continued operation and decommissioning of aging NPPs in Korea. As discussed earlier in characteristics of Korean Stress Test, it is more comprehensive than the EU Stress Test in terms of its multilateral evaluation which includes equipment durability, plant operation, human factors, and safety margins, hence substantially raising the significance and value of the evaluation process. Thus, the addition of Korean Stress Test to the existing Korean Evaluation of CO is expected to greatly increase the quality of safety assessment of aging NPPs in Korea due to its stricter safety policies, hence providing a more meaningful evaluation process. However, a one-time application of the Korean Stress Test to only Kori Unit 1 and Wolsong Unit 1 would be a waste of the great effort that has been done thus far to improve the Korean Evaluation of CO and develop the Korean Stress Test. By extending the Korean Stress Test to all NPPs in Korea would maintain and ensure the reliability of NPPs as well as public

  18. Selection of detailed items for periodic safety review on PWR radwaste management system

    Sung, K. B.; Ahn, Y. S.; Park, Y. S.; Kim, S. H.; Kim, J. T. [Korea Hydric and Nuclear Power Company, Taejon (Korea, Republic of)

    2003-10-01

    Selection of detailed-items for Periodic Safety Review on PWR radwaste management system, the main component could be faithfully clarified according to the purpose of establishment on each system and basic purpose. It is proper to select detailed-items those of radioactivities in the reactor coolant activity levels and the released volume of liquid and gaseous radioactive material on safety performance. It's also proper to select solid radwaste production quantities as detailed-item that it would be predict the next ten years trends after PSR.

  19. Development of regulatory guide for review of aging management of the operating NPP

    Shin, Tae Myung; Lee, Jae Kyung [Cheongju Univ., Cheongju (Korea, Republic of); Kim, Young Ryul [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    2001-03-15

    This is the final report of the second year study. Based on the first year study, proposal of revised guidelines, analysis of revised or newly issued IAEA safety guides and reference guidelines of developed countries, and proposal of detailed guidelines of aging management in PSR have been performed in the second year study. The summary of results in the study so far can be summarized as below, overall view on PSR and idea of effective domestic application were leaded through additional investigation and comparison of legal basis, experiences and current status of PSR implementation among the countries having operating NPPs including Korea. Strategies of adequate application of PSR are roughly reevaluated and totally reestablished in summary from the analysis in factor by factor basis of PSR implementation experience in foreign countries and background of IAEA guidelines. Models and draft framework of PSR report in the first year study were summarized and reevaluated, and structure and outline options of PSR guidelines for judging the PSR report are newly proposed with comparison of their strengths and weaknesses based on the first year study. Among the opt ions, guidelines framework equivalent to the PSR report was picked up as the best. For the judgement of aging management, the most appropriate one was chosen for the detailed judgement of aging management review in our PSR being based on the Standard Review Plan for License Renewal (SRP-LR) in United States considering potential future usage in the judgement for continued operation of old NPP at the time of expiration of its design life. A draft PSR guidelines is prepared and attached by revision of basic guidelines issued in 2000, considering the issues discussed for the draft revision of IAEA PSR guide, the draft IAEA document about 'experience of PSR implementation of member states', and the characteristics of Hungarian PSR Guidelines.

  20. Human Factors Evaluation of Man-Machine Interface for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang

    2006-01-01

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Yonggwang Unit no. 1, 2. As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area

  1. Human Factors Evaluation of Man-Machine Interface for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang (and others)

    2006-01-15

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Yonggwang Unit no. 1, 2. As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area.

  2. Re-assessment of seismic loads in conjunction with periodic safety review

    Jonczyk, Josef

    2002-01-01

    The objective of this paper is the fundamental consideration of a safeguard-aim-oriented approach for use in the re-assessment of seismic events with regard to the periodic safety review (PSR) of nuclear power plants (NPP). The re-assessment aspects of site-specific design earthquakes (DEQ), specially the procedure for seismic hazard analysis, will not, however, be considered in detail here. The proposed assessment concept clearly presents a general approach for safety assessments. The approach is based on a successive screening review of components that are considered sufficiently earthquake-resistant. In this respect, the principle of maximum practical application of the design documentation has been considered in the re-assessment process. On the other hand, the safeguard-aim-oriented evaluation will also be applied with regard to whether the requirements of the safety regulations are fulfilled with respect to the safety goals. The review in conjunction with PSR does not, however, attempt to perform this under all technical aspects. Moreover, it is possible to make extensive use of experimental knowledge and engineering judgement with regard to the structural capacity behaviour in case of a seismic event. Compared with design procedures, however, this proposed approach differs from the one applied in licensing procedures, in which such assessment freedom will not usually be exhausted. (author)

  3. Second periodic safety review of Angra Nuclear Power Station, unit 1

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M., E-mail: ottoncf@tecnatom.com.br, E-mail: emfreire46@gmail.com, E-mail: robcrepaldi@hotmail.com [Tecnatom do Brasil Engenharia e Servicos Ltda, Rio de Janeiro, RJ (Brazil); Campello, Sergio A., E-mail: sacampe@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  4. Second periodic safety review of Angra Nuclear Power Station, unit 1

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M.; Campello, Sergio A.

    2015-01-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  5. AGI Safety Literature Review

    Everitt, Tom; Lea, Gary; Hutter, Marcus

    2018-01-01

    The development of Artificial General Intelligence (AGI) promises to be a major event. Along with its many potential benefits, it also raises serious safety concerns (Bostrom, 2014). The intention of this paper is to provide an easily accessible and up-to-date collection of references for the emerging field of AGI safety. A significant number of safety problems for AGI have been identified. We list these, and survey recent research on solving them. We also cover works on how best to think of ...

  6. Nuclear safety review for 1984

    1985-08-01

    This publication is based on the fourth Nuclear Safety Review prepared by the IAEA Secretariat for presentation to the Board of Governors. It discusses relevant international activities in 1984 and the current status of nuclear safety and radiation protection, and looks ahead to anticipated developments

  7. Nuclear Safety Review for 2014

    2014-07-01

    The Nuclear Safety Review 2014 focuses on the dominant nuclear safety trends, issues and challenges in 2013. The Executive Overview provides general nuclear safety information along with a summary of the major issues covered in this report: strengthening safety in nuclear installations; improving radiation, transport and waste safety; enhancing emergency preparedness and response (EPR); improving regulatory infrastructure and effectiveness; and strengthening civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards, and activities relevant to the Agency’s safety standards. The global nuclear community has made steady and continuous progress in strengthening nuclear safety in 2013, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as “the Action Plan”) and reported in Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2013/8-GC(57)/INF/5), and the Supplementary Information to that report and Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2014/2). • Significant progress continues to be made in several key areas, such as assessments of safety vulnerabilities of nuclear power plants (NPPs), strengthening of the Agency’s peer review services, improvements in EPR capabilities, strengthening and maintaining capacity building, and protecting people and the environment from ionizing radiation. The progress that has been made in these and other areas has contributed to the enhancement of the global nuclear safety framework. • Significant progress has also been made in reviewing the Agency’s safety standards, which continue to be widely applied by regulators, operators and the nuclear industry in general, with increased attention and focus on vitally important areas such as design and operation of NPPs, protection of NPPs against severe accidents, and EPR. • The Agency continued to

  8. Periodic Safety Review in Interim Storage Facilities - Current Regulation and Experiences in Germany

    Neles, Julia Mareike; Schmidt, Gerhard

    2014-01-01

    Periodic safety reviews in nuclear power plants in Germany have been performed since the end of the 1980's as an indirect follow-up of the accident in Chernobyl and, in the meantime, are formally required by law. During this process the guidelines governing this review were developed in stages and reached their final form in 1996. Interim storage facilities and other nuclear facilities at that time were not included, so the guidelines were solely focused on the specific safety issues of nuclear power plants. Following IAEA's recommendations, the Western European Nuclear Regulator Association (WENRA) introduced PSRs in its safety reference levels for storage facilities (current version in WGWD report 2.1 as of Feb 2011: SRLs 59 - 61). Based on these formulations, Germany improved its regulation in 2010 with a recommendation of the Nuclear Waste Management Commission (Entsorgungskommission, ESK), an expert advisory commission for the federal regulatory body BMU. The ESK formulated these detailed requirements in the 'ESK recommendation for guides to the performance of periodic safety reviews for interim storage facilities for irradiated fuel elements and heat-generating radioactive waste'. Before finalization of the guideline a test phase was introduced, aimed to test the new regulation in practice and to later include the lessons learned in the final formulation of the guideline. The two-year test phase started in October 2011 in which the performance of a PSR will be tested at two selected interim storage facilities. Currently these recommendations are discussed with interested/concerned institutions. The results of the test phase shall be considered for improvements of the draft and during the final preparation of guidelines. Currently the PSR for the first ISF is in an advanced stage, the second facility just started the process. Preliminary conclusions from the test phase show that the implementation of the draft guideline requires interpretation. The aim of a

  9. Reviews on Food Safety

    Wilkins, E.

    2004-01-01

    Food safety is an increasing concern. The desire for rapid, specific methods for the detection of viable potential pathogens has grown into a necessity. Microbial contamination of meat, fresh fruits, and vegetables has become a mounting concern during the last decade due to emphasis on their importance in a healthy diet and the recognition of new food borne pathogens such as Campylobacter jejuni, Escherichia coli 0157:H7, and Listeria monocytogenes. This paper presents an overview of different commercial techniques for identification of bacteria such as: III-nitride on Silicon Chips for detection of live bacteria, Optical Biosensors, Piezoelectric-based acoustic wave devices, Electrochemical Biosensors, Immunogenic Techniques, Polymerase chain reaction

  10. Reviews on Food Safety

    Wilkins, E [Department of Chemical and Nuclear Engineering. University orNew Mexico. 209 Farris Engineering Center. Albuquerque. NM 117131 (Ukraine)

    2004-07-01

    Food safety is an increasing concern. The desire for rapid, specific methods for the detection of viable potential pathogens has grown into a necessity. Microbial contamination of meat, fresh fruits, and vegetables has become a mounting concern during the last decade due to emphasis on their importance in a healthy diet and the recognition of new food borne pathogens such as Campylobacter jejuni, Escherichia coli 0157:H7, and Listeria monocytogenes. This paper presents an overview of different commercial techniques for identification of bacteria such as: III-nitride on Silicon Chips for detection of live bacteria, Optical Biosensors, Piezoelectric-based acoustic wave devices, Electrochemical Biosensors, Immunogenic Techniques, Polymerase chain reaction.

  11. Post design evaluation (ageing mechanisms, effects, management, monitoring, PSR, ISI)

    Ichikawa, Toshio

    2001-01-01

    Although the nuclear plant was designed for the purpose of the 30-year life the early stages of construction, it also already has the plant abolished by passing in 30 years. There is a plant under operation and a plant that is employed variously, extends the original life and continues operation now, and the plant that is going to be abolished politically is before a life. By using a nuclear plant for a long period of time, damage. by the influence of irradiation, wear of slipping, corrosion, etc. appears. When this degradation is left, the serious accident is caused. In this lecture, refer to Assessment and management of ageing of major nuclear power plant components important to safety, Oct. 1999 of IAEA. A point of view from guide is introduced about management of the mechanism in the secular degradation mode expected by operating for a long period of time, the influence of secular degradation, and influence, monitoring technology, periodical safe evaluation, and a periodic inspection. And raises and explains the correspondence situation of secular degradation, and the example of evaluation of PSR and ISI equipment. The aging mechanism for reactor vessel internal components considered are related to embrittlement, fatigue, corrosion, radiation induced creep, relaxation and swelling, and mechanical wear. This lecture includes; monitoring methods, a description of periodic safety reviews and a sample of seismic design periodic safety report for the reactor internals

  12. Nuclear Safety Review for 2015

    2015-06-01

    The Nuclear Safety Review 2015 focuses on the dominant nuclear safety trends, issues and challenges in 2014. The Executive Overview provides general nuclear safety information along with a summary of the major issues covered in this report: improving radiation, transport and waste safety; strengthening safety in nuclear installations; enhancing emergency preparedness and response (EPR); and strengthening civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the Agency’s safety standards. The global nuclear community continued to make steady progress in improving nuclear safety throughout the world in 2014; and, the Agency and its Member States continued to implement the IAEA Action Plan on Nuclear Safety (hereinafter referred to as “the Action Plan”), which was endorsed by the General Conference in 2011 after the Fukushima Daiichi accident in March 2011. • Significant progress has been made in reviewing and revising various Agency’s safety standards in areas such as management of radioactive waste, design basis hazard levels, protection of nuclear power plants (NPPs) against severe accidents, design margins to avoid cliff edge effects, multiple facilities at one site, and strengthening the prevention of unacceptable radiological consequences to the public and the environment, communications and EPR. In addition, the Guidelines for Drafting IAEA Safety Standards and Nuclear Security Series Publications was issued in July 2014.• The Agency continued to analyse the relevant technical aspects of the Fukushima Daiichi accident and to share and disseminate lessons learned to the wider nuclear community. In 2014, the Agency organized two international experts’ meetings (IEMs), one on radiation protection and one on severe accident management. Reports from previous IEMs were also published in 2014: IAEA Report on Human and Organizational Factors in Nuclear

  13. Periodic Safety Review of Tendon Pre-stress of Concrete Containment Building for a CA U-Type clear Power Plant

    Joo, Kwang Ho; Lim, Woo Sang [Korea Hydro and clear Power Co., Daejeon (Korea, Republic of)

    2009-10-15

    Generally, as the tendon pre-stress of concrete containment buildings at nuclear power plants decreases as time passes due to the concrete creep, concrete shrinkage and the relaxation of tendon strands, the tendon pre-stress must secure the structural integrity of these buildings by maintaining its value higher than that of the designed pre-stress during the overall service life of the nuclear power plants. Moreover, if necessary, the degree of tendon pre-stress must also guarantee the structural integrity of concrete containment buildings over their lifetimes. This paper evaluated the changes in the tendon pre-stress of a concrete containment building subject to time-limited aging as an item in a periodic safety review (PSR) of Wolsong unit 1, a CANDU-type nuclear power plant to ensure that the structural integrity can be maintained until the next PSR period after the designed lifetime.

  14. Establishment of safety verification method for life extension based on periodic safety review

    Kim, Soong Pyung; Yeom, Yu Son; Yoon, In Sik; Lee, Jeo Young [Chosun Univ., Gwangju (Korea, Republic of)

    2004-02-15

    Safe management of operating lifetimes of Nuclear Power Plants is a subject of prime interests. As the design life of the Nuclear Power Plant will be ended in 2008, an appropriate procedure for the design life re-assessment or lifetime extension is necessary in Korea. Therefore, the objective of this work is to develop procedural requirements which can be applied to the regulation of lifetime management or life extension of Nuclear Power Plants in Korea. Review on the linkage of the PSR with the extension of the operating lifetime of Nuclear Power Plants was performed to enhance the utilization of PSR results and analysis of the insufficiencies in the license rule in Korea.

  15. Human Factors Evaluation of Procedures for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang (and others)

    2006-01-15

    This report describes the results of human factors assessment on the plant operating procedures as part of Periodic Safety Review(PSR) of Yonggwang Nuclear Power Plant Unit no. 1, 2. The suitability of item and appropriateness of format and structure in the key operating procedures of nuclear power plants were investigated by the review of plant operating experiences and procedure documents, field survey, and experimental assessment on some part of procedures. A checklist was used to perform this assessment and record the review results. The reviewed procedures include EOP(Emergency Operating Procedures), GOP(General Operating Procedures), AOP(Abnormal Operating Procedures), and management procedures of some technical departments. As results of the assessments, any significant problem challenging the safety was not found on the human factors in the operating procedures. However, several small items to be changed and improved were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on the operating procedure.

  16. Regulatory review of safety cases and safety assessments - associated challenges

    Bennett, D.G.; Ben Belfadhel, M.; Metcalf, P.E.

    2006-01-01

    Regulatory reviews of safety cases and safety assessments are essential for credible decision making on the licensing or authorization of radioactive waste disposal facilities. Regulatory review also plays an important role in developing the safety case and in establishing stakeholders' confidence in the safety of the facility. Reviews of safety cases for radioactive waste disposal facilities need to be conducted by suitably qualified and experienced staff, following systematic and well planned review processes. Regulatory reviews should be sufficiently comprehensive in their coverage of issues potentially affecting the safety of the disposal system, and should assess the safety case against clearly established criteria. The conclusions drawn from a regulatory review, and the rationale for them should be reproducible and documented in a transparent and traceable way. Many challenges are faced when conducting regulatory reviews of safety cases. Some of these relate to issues of project and programme management, and resources, while others derive from the inherent difficulties of assessing the potential long term future behaviour of engineered and environmental systems. The paper describes approaches to the conduct of regulatory reviews and discusses some of the challenges faced. (author)

  17. Nuclear Safety Research Review Committee

    Todreas, N.E.

    1990-01-01

    The Nuclear Safety Research Review Committee has had a fundamental difficulty because of the atmosphere that has existed since it was created. It came into existence at a time of decreasing budgets. For any Committee the easiest thing is to tell the Director what additional to do. That does not really help him a lot in this atmosphere of reduced budgets which he reviewed for you on Monday. Concurrently the research arm of Nuclear Regulatory Commission has recognized that the scope of its activity needed to be increased rather than decreased. In the last two-and-a-half-year period, human factors work was reinstated, radiation and health effects investigations were reinvigorated, research in the waste area was given significant acceleration. Further, accident management came into being, and the NRC finally got back into the TMI-2 area. So with all of those activities being added to the program at the same time that the research budget was going down, the situation has become very strained. What that leads to regarding Committee membership is a need for technically competent generalists who will be able to sit as the Division Directors come in, as the contractors come in, and sort the wheat from the chaff. The Committee needs people who are interested in and have a broad perspective on what regulatory needs are and specifically how safety research activities can contribute to them. The author summarizes the history of the Committee, the current status, and plans for the future

  18. NPP Krsko Periodic Safety Review action plan

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  19. VHE gamma-rays from radio pulsars and cataclysmic variables. [PSR 1055-52; PSR 1509-58; PSR 1620-26; PSR 1747-46; PSR 1800-21; PSR 1818-04; PSR 1821-24; PSR 1822-09; PSR 1823-13; PSR 1855+09; PSR 1929+10; PSR 1957+20

    De Jager, O.C.; Brink, C.; Meintjies, P.J.; Nel, H.I.; North, A.R.; Raubenheimer, B.C.; Van der Walt, D.J. (Potchefstroom Univ. for C.H.E. (South Africa). Dept. of Physics)

    1990-03-01

    We present the results of observations (above 1 TeV) of radio pulsars and cataclysmic variables with the Potchefstroom air Cerenkov facility. We were able to confirm our previous detection of PSR 1509-58 and the final significance is 1.7x10{sup -5}. A DC enhancement at the 10{sup -3} significance level was seen from the L{sub 4} Lagrange position in the PSR 1957+20 system. This result was confirmed by COS-B data. We were also able to detect the 5.4 ms pulsar PSR 1855+09 at a marginal significance level of 5%. However, the best and longest observation indicates non-uniformity at the 0.005 significance level. The TeV light curve resembles the radio light curve. The latter is also reminiscent of other millisecond pulsar observed above 1 TeV. The intermediate polar AEAQR (P = 33.08s) shows a period shift which is consistent with recent model predictions. However, the present significance of this results does not allow an unambiguous claim. (orig.).

  20. Technical Issues and Proposes on the Legislation of Probabilistic Safety Assessment in Periodic Safety Review

    Hwang, Seok-Won; Jeon, Ho-Jun; Na, Jang-Hwan

    2015-01-01

    Korean Nuclear Power Plants have performed a comprehensive safety assessment reflecting design and procedure changes and using the latest technology every 10 years. In Korea, safety factors of PSR are revised to 14 by revision of IAEA Safety Guidelines in 2003. In the revised safety guidelines, safety analysis field was subdivided into deterministic safety analysis, PSA (Probabilistic safety analysis), and hazard analysis. The purpose to examine PSA as a safety factor on PSR is to make sure that PSA results and assumptions reflect the latest state of NPPs, validate the level of computer codes and analytical models, and evaluate the adequacy of PSA instructions. In addition, its purpose is to derive the plant design change, operating experience of other plants and safety enhancement items as well. In Korea, PSA is introduced as a new factor. Thus, the overall guideline development and long-term implementation strategy are needed. Today in Korea, full-power PSA model revision and low-power and shutdown (LPSD) PSA model development is being performed as a part of the post Fukushima action items for operating plants. The scope of the full-power PSA is internal/external level 1, 2 PSA. But in case of fire PSA, the scope is level 1 PSA using new method, NUREG/CR-6850. In case of LPSD PSA, level 1 PSA for all operating plants, and level 2 PSA for 2 demonstration plants are under development. The result of the LPSD PSA will be used as major input data for plant specific SAMG (Severe Accident Management Guideline). The scope of PSA currently being developed in Korea cannot fulfill 'All Mode, All Scope' requirements recommended in the IAEA Safety Guidelines. Besides the legislation of PSA, step-by-step development strategy for non-performed scopes such as level 3 PSA and new fire PSA is one of the urgent issues in Korea. This paper suggests technical issues and development strategies for each PSA technical elements.

  1. PSR extraction kicker system improvements

    Hardek, T.W.

    1991-01-01

    A program to improve the reliability of hardware required to operate the Los Alamos Proton Storage Ring has been under way for the past three years. The extraction kicker system for the PSR was identified as one candidate for improvement. Pulse modulators produce 50kV pulses 360 nsec in length at up to 24-Hz pulse repetition rate and drive two 4-meter-long stripline electrodes. Sources of difficulty with this system included short width switch tube lifetime, drive cable electrical breakdown, high-voltage connector failure, and occasional electrode breakdown. This paper discusses modifications completed on this system to correct these difficulties. 2 refs., 3 figs

  2. Nuclear safety review for the year 2002

    NONE

    2003-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. The final version of the Nuclear Safety Review for the Year 2002 was prepared in the light of the discussion by the Board of Governors in March 2002. This report presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety at the end of 2002. This overview is supported by a more detailed factual account of safety-related events and issues worldwide during 2002. National authorities and the international community continued to reflect and act upon the implications of the events of II September 2001 for nuclear, radiation, transport and waste safety. In the light of this, the Agency has decided to transfer the organizational unit on nuclear security from the Department of Safeguards to the Department of Nuclear Safety (which thereby becomes the Department of Nuclear Safety and Security). By better exploiting the synergies between safety and security and promoting further cross-fertilization of approaches, the Agency is trying to help build up mutually reinforcing global regimes of safety and security. However, the Nuclear Safety Review for the Year 2002 addresses only those areas already in the safety programme. This short analytical overview is supported by a second part (corresponding to Part I of the Nuclear Safety Reviews of previous years), which describes significant safety-related events and issues worldwide during 2002. A Draft Nuclear Safety Review for the Year 2002 was submitted to the March 2003 session of the Board of Governors in document GOV/2003/6.

  3. Nuclear safety review for the year 2002

    2003-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. The final version of the Nuclear Safety Review for the Year 2002 was prepared in the light of the discussion by the Board of Governors in March 2002. This report presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety at the end of 2002. This overview is supported by a more detailed factual account of safety-related events and issues worldwide during 2002. National authorities and the international community continued to reflect and act upon the implications of the events of II September 2001 for nuclear, radiation, transport and waste safety. In the light of this, the Agency has decided to transfer the organizational unit on nuclear security from the Department of Safeguards to the Department of Nuclear Safety (which thereby becomes the Department of Nuclear Safety and Security). By better exploiting the synergies between safety and security and promoting further cross-fertilization of approaches, the Agency is trying to help build up mutually reinforcing global regimes of safety and security. However, the Nuclear Safety Review for the Year 2002 addresses only those areas already in the safety programme. This short analytical overview is supported by a second part (corresponding to Part I of the Nuclear Safety Reviews of previous years), which describes significant safety-related events and issues worldwide during 2002. A Draft Nuclear Safety Review for the Year 2002 was submitted to the March 2003 session of the Board of Governors in document GOV/2003/6

  4. Assessment of policy issues in nuclear safety regulation according to circumstantial changes

    Chang, Soon Heung; Lee, Byong Ho; Baek, Woon Pil; Lee, Seong Wook; Choi, Seong Soo; Roh, Chang Hyun; Lee, Kwang Gu [Korea Advanced Institute of Scienc and Technology, Taejon (Korea, Republic of)

    1998-03-15

    The objective of the work is to assess various issues in nuclear safety regulation in consideration of circumstantial changes. Emphasis is given to the safety of operating NPPs. The derivation of an effective regulation system considering 'Rhodic Safety Review (PSR)', 'operating License Renewal (LR)', 'backfitting' and 'maintenance rule' is the main objective of the first two years. It is found that those approaches should be introduced in Korea as soon as possible, with cross lingkage to maximize the effectiveness of regulation. In particular, the approaches for PSR are discussed with consultation of IAEA document and foreign practices.

  5. US nuclear safety review and experience

    Gilinsky, V.

    1977-01-01

    The nuclear safety review of commercial nuclear power reactors has changed over the years from the relatively simple review of Dresden 1 in 1955 to the highly complex and sophisticated regulatory process which characterizes today's reviews. Four factors have influenced this evolution: (1) maturing of the technology and industry; (2) development of the regulatory process and associated staff; (3) feedback of operating experience; and (4) public awareness and participation. The NRC's safety review responsibilities start before an application is tendered and end when the plant is decommissioned. The safety review for reactor licensing is a comprehensive, two-phase process designed to assure that all the established conservative acceptance criteria are satisfied. Operational safety is assured through a strong inspection and enforcement program which includes shutting down operating facilities when necessary to protect the health and safety of the public. The safety of operating reactors is further insured through close regulation of license changes and selective backfitting of new regulatory requirements. An effective NRC standards development program has been implemented and coordinates closely with the national standards program. A confirmatory safety research program has been developed. Both of these efforts are invaluable to the nuclear safety review because they provide the staff with key tools needed to carry out its regulatory responsibilities. Both have been given increased emphasis since the formation of the NRC in 1975. The safety review process will continue to evolve, but changes will be slower and more deliberate. It will be influenced by standardization, early site reviews and development of advanced reactor concepts. New legislation may make possible changes which will simplify and shorten the regulatory process. Certainly the experience provided by the increasing number and types of operating plants will have a very strong impact on future trends in the

  6. A literature review of safety culture.

    Cole, Kerstan Suzanne; Stevens-Adams, Susan Marie; Wenner, Caren A.

    2013-03-01

    Workplace safety has been historically neglected by organizations in order to enhance profitability. Over the past 30 years, safety concerns and attention to safety have increased due to a series of disastrous events occurring across many different industries (e.g., Chernobyl, Upper Big-Branch Mine, Davis-Besse etc.). Many organizations have focused on promoting a healthy safety culture as a way to understand past incidents, and to prevent future disasters. There is an extensive academic literature devoted to safety culture, and the Department of Energy has also published a significant number of documents related to safety culture. The purpose of the current endeavor was to conduct a review of the safety culture literature in order to understand definitions, methodologies, models, and successful interventions for improving safety culture. After reviewing the literature, we observed four emerging themes. First, it was apparent that although safety culture is a valuable construct, it has some inherent weaknesses. For example, there is no common definition of safety culture and no standard way for assessing the construct. Second, it is apparent that researchers know how to measure particular components of safety culture, with specific focus on individual and organizational factors. Such existing methodologies can be leveraged for future assessments. Third, based on the published literature, the relationship between safety culture and performance is tenuous at best. There are few empirical studies that examine the relationship between safety culture and safety performance metrics. Further, most of these studies do not include a description of the implementation of interventions to improve safety culture, or do not measure the effect of these interventions on safety culture or performance. Fourth, safety culture is best viewed as a dynamic, multi-faceted overall system composed of individual, engineered and organizational models. By addressing all three components of

  7. Reviewing industrial safety in nuclear power plants

    1990-02-01

    This document contains guidance and reference materials for Operational Safety Review Team (OSART) experts, in addition to the OSART Guidelines (TECDOC-449), for use in the review of industrial safety activities at nuclear power plants. It sets out objectives for an excellent industrial safety programme, and suggests investigations which should be made in evaluating industrial safety programmes. The attributes of an excellent industrial safety programme are listed as examples for comparison. Practical hints for reviewing industrial safety are discussed, so that the necessary information can be obtained effectively through a review of documents and records, discussions with counterparts, and field observations. There are several annexes. These deal with major features of industrial safety programmes such as safety committees, reporting and investigation systems and first aid and medical facilities. They include some examples which are considered commendable. The document should be taken into account not only when reviewing management, organization and administration but also in the review of related areas, such as maintenance and operations, so that all aspects of industrial safety in an operating nuclear power plant are covered

  8. Nuclear Safety Review for the Year 2003

    2004-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. In line with the suggestions made by the Board of Governors in March 2002, the first part is more analytical and less descriptive. This short analytical overview is supported by a second part, which describes significant safety related events and issues worldwide during 2003. A Draft Nuclear Safety Review for the Year 2003 was submitted to the March 2004 session of the Board of Governors in document GOV/2004/3. The final version of the Nuclear Safety Review for the Year 2003 was prepared in the light of the discussion by the Board.

  9. Radiation safety assessment and development of environmental radiation monitoring technology

    Choi, B H; Kim, S G

    2002-01-01

    The Periodic Safety Review(PSR) of the existing nuclear power plants is required every ten years according to the recently revised atomic energy acts. The PSR of Kori unit 1 and Wolsong unit 1 that have been operating more than ten years is ongoing to comply the regulations. This research project started to develop the techniques necessary for the PSR. The project developed the following four techniques at the first stage for the environmental assessment of the existing plants. 1) Establishment of the assessment technology for contamination and accumulation trends of radionuclides, 2) alarm point setting of environmental radiation monitoring system, 3) Development of Radiation Safety Evaluation Factor for Korean NPP, and 4) the evaluation of radiation monitoring system performance and set-up of alarm/warn set point. A dynamic compartment model to derive a relationship between the release rates of gas phase radionuclides and the concentrations in the environmental samples. The model was validated by comparing ...

  10. Occupational Safety Review of High Technology Facilities

    Lee Cadwallader

    2005-01-31

    This report contains reviews of operating experiences, selected accident events, and industrial safety performance indicators that document the performance of the major US DOE magnetic fusion experiments and particle accelerators. These data are useful to form a basis for the occupational safety level at matured research facilities with known sets of safety rules and regulations. Some of the issues discussed are radiation safety, electromagnetic energy exposure events, and some of the more widespread issues of working at height, equipment fires, confined space work, electrical work, and other industrial hazards. Nuclear power plant industrial safety data are also included for comparison.

  11. Internet Safety and Security Surveys - A Review

    Sharp, Robin

    This report gives a review of investigations into Internet safety and security over the last 10 years. The review covers a number of surveys of Internet usage, of Internet security in general, and of Internet users' awareness of issues related to safety and security. The focus and approach...... of the various surveys is considered, and is related to more general proposals for investigating the issues involved. A variety of proposals for how to improve levels of Internet safety and security are also described, and they are reviewed in the light of studies of motivational factors which affect the degree...

  12. Nuclear Safety Review for the Year 2012

    2012-07-01

    The Nuclear Safety Review for the Year 2012 contains an analytical overview of the dominant trends, issues and challenges worldwide in 2011 and the Agency's efforts to strengthen the global nuclear safety framework. This year's report also highlights issues and activities related to the accident at the Fukushima Daiichi nuclear power plant. The analytical overview is supported by the Appendix at the end of this document, entitled: The IAEA Safety Standards: Activities during 2011. A draft version of the Nuclear Safety Review for the Year 2012 was submitted to the March 2012 session of the Board of Governors in document GOV/2012/6. The final version of the Nuclear Safety Review for the Year 2012 was prepared in light of the discussions held during the Board of Governors and also of the comments received.

  13. The necessity of periodic fire safety review

    Mowrer, D.S.

    1998-01-01

    Effective fire safety requires the coordinated integration of many diverse elements. Clear fire safety objectives are defined by plant management and/or regulatory authorities. Extensive and time-consuming systematic analyses are performed. Fire safety features (both active and passive) are installed and maintained, and administrative programs are established and implemented to achieve the defined objectives. Personnel are rigorously trained. Given the time, effort and monetary resources expended to achieve a specific level of fire safety, conducting periodic assessments to verify that the specified level of fire safety has been achieved and is maintained is a matter of common sense. Periodic fire safety reviews and assessment play an essential role in assuring continual nuclear safety in the world's power plants

  14. Nuclear safety review for the year 2001

    2002-07-01

    The Nuclear Safety Review for the Year 2001 reports on worldwide efforts to strengthen nuclear and radiation safety, including radioactive waste safety. It is in three parts. Part 1 describes those events in 2001 that have, or may have, significance for nuclear, radiation and waste safety worldwide. It includes developments such as new initiatives in international cooperation, events of safety significance and events that may be indicative of trends in safety. Part 2 describes some of the IAEA's efforts to strengthen international co-operation in nuclear, radiation and waste safety during 2001. It covers legally binding international agreements, non-binding safety standards, and provisions for the application of safety standards. This is done in a very brief manner, because these issues are addressed in more detail in the Agency's Annual Report for 2001. Part 3 presents a brief look ahead to some issues that are likely to be prominent in the coming year(s). The topics covered were selected by the IAEA Secretariat on the basis of trends observed in recent years, account being taken of planned or expected future developments. A draft of the Nuclear Safety Review for the Year 2001 was presented to the March 2002 session of IAEA's Board of Governors. This final version has been prepared taking account of the discussion in the Board. In some places, information has been added to describe developments early in 2002 that were considered pertinent to the discussion of events during 2001

  15. Nuclear safety review for the year 1997

    1998-12-01

    The Nuclear Safety Review attempts to summarize the global nuclear safety scene during 1997. It starts with discussion of significant safety related events worldwide: International cooperation; reactor facilities; radioactive waste management; medical uses of radiation sources; events at other facilities and transport of radioactive material. This is followed by a description of principal IAEA activities that contributed to global nuclear safety, namely: legally binding international agreements; non-binding safety standards and their application. The third part highlights developments in Member States as they reported them. The review closes with a description of issues that are likely to be prominent in the coming year(s). A draft version was submitted to the March 1998 session of the IAEA Board of Governors, and this final version has been prepared in light of the discussion in the Board and was submitted for information to the 42nd session of the IAEA General Conference

  16. The Interagency Nuclear Safety Review Panel's Galileo safety evaluation report

    Nelson, R.C.; Gray, L.B.; Huff, D.A.

    1989-01-01

    The safety evaluation report (SER) for Galileo was prepared by the Interagency Nuclear Safety Review Panel (INSRP) coordinators in accordance with Presidential directive/National Security Council memorandum 25. The INSRP consists of three coordinators appointed by their respective agencies, the Department of Defense, the Department of Energy (DOE), and the National Aeronautics and Space Administration (NASA). These individuals are independent of the program being evaluated and depend on independent experts drawn from the national technical community to serve on the five INSRP subpanels. The Galileo SER is based on input provided by the NASA Galileo Program Office, review and assessment of the final safety analysis report prepared by the Office of Special Applications of the DOE under a memorandum of understanding between NASA and the DOE, as well as other related data and analyses. The SER was prepared for use by the agencies and the Office of Science and Technology Policy, Executive Office of the Present for use in their launch decision-making process. Although more than 20 nuclear-powered space missions have been previously reviewed via the INSRP process, the Galileo review constituted the first review of a nuclear power source associated with launch aboard the Space Transportation System

  17. 49 CFR 659.27 - Internal safety and security reviews.

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Internal safety and security reviews. 659.27... State Oversight Agency § 659.27 Internal safety and security reviews. (a) The oversight agency shall... safety and security reviews in its system safety program plan. (b) The internal safety and security...

  18. Post Chernobyl safety review at Ontario Hydro

    Frescura, G.M.; Luxat, J.C.; Jobe, C.

    1991-01-01

    It is generally recognized that the Chernobyl Unit 4 accident did not reveal any new phenomena which had not been previously identified in safety analyses. However, the accident provided a tragic reminder of the potential consequences of reactivity initiated accidents (RIAs) and stimulated nuclear plant operators to review their safety analyses, operating procedures and various operational and management aspects of nuclear safety. Concerning Ontario Hydro, the review of the accident performed by the corporate body responsible for nuclear safety policy and by the Atomic Energy Control Board (the Regulatory Body) led to a number of specific recommendations for further action by various design, analysis and operation groups. These recommendations are very comprehensive in terms of reactor safety issues considered. The general conclusion of the various studies carried out in response to the recommendations, is that the CANDU safety design and the procedures in place to identify and mitigate the consequences of accidents are adequate. Improvements to the reliability of the Pickering NGSA shutdown system and to some aspects of safety management and staff training, although not essential, are possible and would be pursued. In support of this conclusion, the paper describes some of the studies that were carried out and discusses the findings. The first part of the paper deals with safety design aspects. While the second is concerned with operational aspects

  19. Internal safety review team at Comanche Peak SES

    Davis, D [Comanche Peak Steam Electric Staion, Texas Utilities, TX (United States)

    1997-09-01

    The presentations describes the following issues: levels of defense in depth; internal safety review organizations; methods used to perform safety assessment; safety committee review; quality verification; root cause analysis; human performance program; industry operating experience.

  20. Nuclear safety review for the year 2000

    2001-06-01

    The nuclear safety review for the year 2000 reports on worldwide efforts to strengthen nuclear and radiation safety, including radioactive waste safety. It is in three parts: Part 1 describes those events in 2000 that have, or may have, significance for nuclear, radiation and waste safety worldwide. It includes developments such as new initiatives in international cooperation, events of safety significance and events that may be indicative of trends in safety; Part 2 describes some of the IAEA efforts to strengthen international co-operation in nuclear, radiation and waste safety during 2000. It covers legally binding international agreements, non-binding safety standards, and provisions for the application of safety standards. This is done in a very brief manner, because these issues are addressed in more detail in the Agency's Annual Report for 2000; Part 3 presents a brief look ahead to some issues that are likely to be prominent in the coming year(s). The topics covered were selected by the IAEA Secretariat on the basis of trends observed in recent years, account being taken of planned or expected future developments. A draft of the Nuclear Safety Review for the Year 2000 was presented to the March 2001 session of the IAEA Board of Governors. This final version has been prepared taking account of the discussion in the Board. In some places, information has been added to describe developments early in 2001 that were considered pertinent to the discussion of events during 2000. In such cases, a note containing the more recent information has been provided in the form of a footnote

  1. Regulatory review of safety cases and safety assessments for near surface

    Nys, V.

    2003-01-01

    The activities of the ASAM Regulatory Review Working Group are presented. Regulatory review of the safety assessment is made. It includes the regulatory review of post-closure safety assessment; safety case development and confidence building. The ISAM methodology is reviewed and SA system description is presented. Recommendations on the review process management are given

  2. Status of the PSR improvement program

    Macek, R.J.; Fitzgerald, D.H.; Hoehn, M.V.; Ryder, R.D.; York, R.L.

    1993-01-01

    A program of improvements to increase intensity and improve reliability of the Los Alamos Proton Storage Ring (PSR) has been under way for several years. Reduction of stored beam loss rates by a factor of 4.6 since 1987 through exploitation of H 0 injection has allowed the average intensity to increase by a factor of two to 75μA. Reliability of the PSR and associated beam delivery systems has been improved by extensive rework of numerous subsystems. Radiation protection has been improved by additional shielding of Line D and extensive use of relatively fail-safe radiation detectors incorporated into an improved radiation security system

  3. Review of fuel safety criteria in France

    Boutin, Sandrine; Graff, Stephanie; Foucher-Taisne, Aude; Dubois, Olivier [Institut de Radioprotection et du Surete Nucleaire, Fontenay-aux-Roses (France)

    2018-01-15

    Fuel safety criteria for the first barrier, based on state-of-the-art at the time, were first defined in the 1970s and came from the United States, when the French nuclear program was initiated. Since then, there has been continuous progress in knowledge and in collecting experimental results thanks to the experiments carried out by utilities and research institutes, to the operating experience, as well as to the generic R and D programs, which aim notably at improving computation methodologies, especially in Reactivity-Initiated accident and Loss-of-Coolant Accident conditions. In this context, the French utility EDF proposed new fuel safety criteria, or reviewed and completed existing safety demonstration covering the normal operating, incidental and accidental conditions of Pressurised Water Reactors. IRSN assessed EDF's proposals and presented its conclusions to the Advisory Committee for Reactors Safety of the Nuclear Safety Authority in June 2017. This review focused on the relevance of historical limit values or parameters of fuel safety criteria and their adequacy with the state-of-the-art concerning fuel physical phenomena (e.g. Pellet-Cladding Mechanical Interaction in incidental conditions, clad embrittlement due to high temperature oxidation in accidental conditions, clad ballooning and burst during boiling crisis and fuel melting).

  4. Review of fuel safety criteria in France

    Boutin, Sandrine; Graff, Stephanie; Foucher-Taisne, Aude; Dubois, Olivier

    2018-01-01

    Fuel safety criteria for the first barrier, based on state-of-the-art at the time, were first defined in the 1970s and came from the United States, when the French nuclear program was initiated. Since then, there has been continuous progress in knowledge and in collecting experimental results thanks to the experiments carried out by utilities and research institutes, to the operating experience, as well as to the generic R and D programs, which aim notably at improving computation methodologies, especially in Reactivity-Initiated accident and Loss-of-Coolant Accident conditions. In this context, the French utility EDF proposed new fuel safety criteria, or reviewed and completed existing safety demonstration covering the normal operating, incidental and accidental conditions of Pressurised Water Reactors. IRSN assessed EDF's proposals and presented its conclusions to the Advisory Committee for Reactors Safety of the Nuclear Safety Authority in June 2017. This review focused on the relevance of historical limit values or parameters of fuel safety criteria and their adequacy with the state-of-the-art concerning fuel physical phenomena (e.g. Pellet-Cladding Mechanical Interaction in incidental conditions, clad embrittlement due to high temperature oxidation in accidental conditions, clad ballooning and burst during boiling crisis and fuel melting).

  5. Development of web-based safety review advisory system

    Kim, M. W.; Lee, H. C.; Park, S. O.; Lee, K. H.; Hur, K. Y.; Lee, S. J.; Choi, S. S.; Kang, C. M.

    2002-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS (Korea Institute of Nuclear Safety). The Safety Review Advisory System(SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described

  6. Development of safety review advisory system for nuclear power plants

    Kim, M. W.; Lee, H. C.; Park, S. O.; Park, W. J.; Lee, J. I.; Hur, K. Y.; Choi, S. S.; Lee, S. J.; Kang, C. M.

    2001-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application program was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they were investigated by the safety review experts at KINS. Safety Review Advisory System (SRAS), the windows application on client-server environment was developed according to the above specifications. Reviewers can do their safety reviewing regardless of speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into three groups, administrator, project manager, and reviewer. Each user group has appropriate access capability. The function and some screen shots of SRAS are described in this paper

  7. Comprehensive review of the maritime safety regimes.

    S. Knapp (Sabine); Ph.H.B.F. Franses (Philip Hans)

    2007-01-01

    textabstractThis report presents a comprehensive review of the maritime safety regimes and provides recommendations on how to improve the system. The results show a complex legal framework which generates a high amount of inspections and overlapping of inspection areas where no cross-recognition is

  8. REVIEW OF SAFETY AND TOLERANCE OF OMALIZUMAB

    A.V. Emel'yanov

    2008-01-01

    Full Text Available The review of safety of monoclonal anti-ige-antibodies (xolair — a new medication for the treatment of severe allergic bronchial asthma is presented. Local and system adverse events, originating after injection of medicament in clinical studies and following administration in patients are discussed.Key words: children, bronchial asthma, monoclonal anti Ige antibodies.

  9. Status of safety analysis reports

    Cserhati, A.

    1999-01-01

    The safety regulation connected to both of the Atomic Acts from 1980 and 1996 requires preparation of the Preliminary Safety Analysis Report (PSAR) as well as Final SAR (FSAR). In this respect the licensing procedure for the construction and commissioning of Paks NPP did not formally deviate from the standards applied in developed countries; this is particularly true if comparison is made with the standards applied for commissioning NPPs in the second half of the seventies. By the time the overall development of internationally accepted safety standards and some existing deficiencies of earlier SAR made necessary a general reassessment of the plant safety (AGNES project). The carried out PSR for Paks-1 and 2 also added a valuable contribution to the SAR content, however a formal update of SAR is not made yet. A Hungarian nuclear authority decree from 1997 obligates the licensee to prepare and submit a major upgrade of FSAR until the mid of 2000, after finishing the PSR for Paks-3 and 4. From this date a periodic update of FSAR is required every year. The operational license renewal affects only the PSR but not the FSAR updating. The new Nuclear Safety Code outlines the contents of PSAR and FSAR, based on US NRC Reg. Guide 1. 70. Rev. 3. Hungary by now can fulfill the upgrading of SAR without major external technical or financial help. The AGNES project covered the safety analysis chapters of SAR. It was financed mainly by the country. In the project there have been involved in limited cases as performers the VTT (Finland), Belgatom (Belgium), GRS (Germany), etc., the IVO (Finland) fulfilled tasks of an independent reviewer for safety analysis. The AGNES had certain interconnection with the similar IAEA RER safety reassessment project for WWER-440/213. The PSR for Paks-1 and 2 have been carried out by the Paks staff from the resources of the plant. During the evaluation of several parts of Paks-3 and 4 PSR documentation the authority intends to use certain

  10. Status of safety analysis reports

    Cserhati, A

    1999-06-01

    The safety regulation connected to both of the Atomic Acts from 1980 and 1996 requires preparation of the Preliminary Safety Analysis Report (PSAR) as well as Final SAR (FSAR). In this respect the licensing procedure for the construction and commissioning of Paks NPP did not formally deviate from the standards applied in developed countries; this is particularly true if comparison is made with the standards applied for commissioning NPPs in the second half of the seventies. By the time the overall development of internationally accepted safety standards and some existing deficiencies of earlier SAR made necessary a general reassessment of the plant safety (AGNES project). The carried out PSR for Paks-1 and 2 also added a valuable contribution to the SAR content, however a formal update of SAR is not made yet. A Hungarian nuclear authority decree from 1997 obligates the licensee to prepare and submit a major upgrade of FSAR until the mid of 2000, after finishing the PSR for Paks-3 and 4. From this date a periodic update of FSAR is required every year. The operational license renewal affects only the PSR but not the FSAR updating. The new Nuclear Safety Code outlines the contents of PSAR and FSAR, based on US NRC Reg. Guide 1. 70. Rev. 3. Hungary by now can fulfill the upgrading of SAR without major external technical or financial help. The AGNES project covered the safety analysis chapters of SAR. It was financed mainly by the country. In the project there have been involved in limited cases as performers the VTT (Finland), Belgatom (Belgium), GRS (Germany), etc., the IVO (Finland) fulfilled tasks of an independent reviewer for safety analysis. The AGNES had certain interconnection with the similar IAEA RER safety reassessment project for WWER-440/213. The PSR for Paks-1 and 2 have been carried out by the Paks staff from the resources of the plant. During the evaluation of several parts of Paks-3 and 4 PSR documentation the authority intends to use certain

  11. Review on JMTR safety design for LEU core conversion

    Komori, Yoshihiro; Yokokawa, Makoto; Saruta, Toru; Inada, Seiji; Sakurai, Fumio; Yamamoto, Katsumune; Oyamada, Rokuro; Saito, Minoru

    1993-12-01

    Safety of the JMTR was fully reviewed for the core conversion to low enriched uranium fuel. Fundamental policies for the JMTR safety design were reconsidered based on the examination guide for safety design of test and research reactors, and safety of the JMTR was confirmed. This report describes the safety design of the JMTR from the viewpoint of major functions for reactor safety. (author)

  12. Optical observations of the millisecond pulsars PSR 1937+214 and PSR 1953+29

    Loredo, T.J.; Ricker, G.R.; Rappaport, S.A.; Middleditch, J.

    1984-01-01

    The results of photometric and time-resolved optical observations of the fields of the recently discovered ultra-fast radio pulsars, PSR 1937+214 and PSR 1953+29 (Backer et al. 1982; Boriakoff et al. 1983) are reported. Deep images of the fields reveal no conspicuous optical counterpart for PSR 1937+214, though a star with m/sub r/ approx. 20.5 is coincident with the position of PSR 1953+29. Time-resolved images of the fields of both objects, obtained with a new stroboscopic technique, have yielded upper limits on the pulsed near-infrared emission from each object. Constraints on the physical models for these systems derived from the optical studies are briefly discussed. 25 references, 9 figures, 4 tables

  13. Periodic safety review of the experimental fast reactor JOYO. Review of the activity for safety

    Maeda, Yukimoto; Kashimura, Youichi; Suzuki, Toshiaki; Isozaki, Kazunori; Hoshiba, Hideaki; Kitamura, Ryoichi; Nakano, Tomoyuki; Takamatsu, Misao; Sekine, Takashi

    2005-02-01

    Periodic safety review (Review of the activity for safety) which consisted of 'Comprehensive evaluation of operation experience' and Incorporation of the latest technical knowledge' was carried out up to January 2005. 1. Comprehensive evaluation of operation experience. It was confirmed that the effectual activities for safety through the operation of JOYO were carried out in terms of (1) Operation management, (2) Maintenance management, (3) Fuel management, (4) Radiation management, (5) Radioactive waste management, (6) Emergency planning and (7) Feedback of incidents and failures. 2. Reflection of the latest technical knowledge. It was confirmed that the latest technical knowledge including regulation and guide line established by Nuclear Safety Commission of Japan until March 31st. 2003 were properly reflected in impressing the safety of the reactor. As a result, it was evaluated that the activity for safety was carried out effectually, and no additional measure was identified continual safe operation of the reactor. (author)

  14. Safety Review Services, Site Review Services and IRRS

    Yllera, Javier

    2010-01-01

    The selection and the evaluation of the site for a nuclear power plant are crucial parts of establishing a nuclear power programme and can be significantly affected by costs, public acceptance and safety considerations. Siting is the process of selecting a suitable site for a facility. This is area containing the plant, defined by a boundary and under effective control of the Plant Management. For safety related issues comparison within topics is generally quite straightforward. For example, sites with relatively higher seismic hazard would be penalized in comparison with those in more stable areas. The site for the NPP is generally chosen at a relatively ‘aseismic’ part of the country. This generally means that well known seismogenic sources are more than at least 50 kms from the site. The proposed sites for nuclear installations shall be examined with respect to the frequency and the severity of natural and human induced events and phenomena that could affect the safety of the installation. The Events unconnected with the operation of a facility or activity which could have an effect on the safety of the facility or activity. The relationship between the site and the design for the nuclear installation shall be examined to ensure that the radiological risk to the public and the environment arising from releases defined by the source terms is acceptably low. The Nuclear Regulatory Authority should issue a document that sets out the technical safety and security criteria against which the Site Permit Application for a new NPP will be reviewed. The objective of the Site Safety Review Services (SSRS) is provided upon request from a Member State. An independent review and assessment of the site and nuclear installation safety in relation to external natural and man induced hazards. This is to make recommendations on additional analysis or plant modifications to be carried out in order to comply with the IAEA Safety Standards and to enhance safety

  15. Development of web-based safety review advisory system

    Kim, M. W.; Hur, K. Y.; Lee, S. J.; Choi, S. J.

    2002-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS. Safety Review Advisory System (SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described

  16. [Improving patient safety through voluntary peer review].

    Kluge, S; Bause, H

    2015-01-01

    The intensive care unit (ICU) is one area of the hospital in which processes and communication are of primary importance. Errors in intensive care units can lead to serious adverse events with significant consequences for patients. Therefore quality and risk-management are important measures when treating critically ill patients. A pragmatic approach to support quality and safety in intensive care is peer review. This approach has gained significant acceptance over the past years. It consists of mutual visits by colleagues who conduct standardised peer reviews. These reviews focus on the systematic evaluation of the quality of an ICU's structure, its processes and outcome. Together with different associations, the State Chambers of Physicians and the German Medical Association have developed peer review as a standardized tool for quality improvement. The common goal of all stakeholders is the continuous and sustainable improvement in intensive care with peer reviews significantly increasing and improving communication between professions and disciplines. Peer reviews secure the sustainability of planned change processes and consequently lead the way to an improved culture of quality and safety.

  17. Nuclear Safety Review for the Year 2006

    2007-07-01

    the various stakeholders effectively and efficiently. Related to this is the need for operators, users and regulatory bodies to communicate with the public effectively and in an open and transparent manner. The global nature of safety is reflected in the relevant international instruments, including conventions and codes of conduct, currently in place. All the international conventions related to safety welcomed additional contracting parties in 2006. During the year, the second review meeting took place for the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. The newly established Integrated Regulatory Review Service (IRRS) is contributing to the enhancement of Member States' legislative and regulatory infrastructure and the harmonization of regulatory approaches in nuclear, radiation, radioactive waste and transport safety. It is also one of the most effective feedback tools on the application of Agency standards that will be used for the further improvement of existing standards and guidance. In addition, the approach evaluates not only the policies and strategies, but also how efficient and effective they are regarding protection against all types of exposure. Therefore it is also a tool for information sharing and mutual learning on good policies and practices that can be used to reach harmonization step by step. Overall, the safety performance of the nuclear industry is good. However, there continue to be recurring events and there is a need to maintain vigilance. There is also a need for lessons learned to be transferred across the various sectors of the nuclear industry. Strong safety management and safety culture are vitally important for the continuation of this good performance. Leaders must ensure that personnel are properly trained and that adequate resources are available. The nuclear power industry around the world remains a safe and sound one with no worker or member of the public receiving a

  18. Nuclear Safety Review for the Year 2007

    2008-07-01

    In 2007, the 50th anniversary year of the Agency, the safety performance of the nuclear industry, on the whole, remained high, although incidents and accidents with no significant impact on public health and safety continue to make news headlines and challenge operators and regulators. It is therefore essential to maintain vigilance, continuously improve safety culture and enhance the international sharing and utilization of operating and other safety experience, including that resulting from natural events. The establishment and sustainability of infrastructures for all aspects of nuclear, radiation, transport and waste safety will remain a high priority. Member States embarking on nuclear power programmes will need to be active participants in the global nuclear safety regime. Harmonized safety standards, the peer review mechanism among contracting parties of the safety conventions, and sharing safety knowledge and best practices through networking are key elements for the continuous strengthening of the global nuclear safety regime. Technical and scientific support organizations (TSOs), whether part of the regulatory body or a separate organization, are gaining increased importance by providing the technical and scientific basis for safety related decisions and activities. There is a need for enhanced interaction and cooperation between TSOs. Academic and industrial expert communities also play a vital role in improving safety cooperation and capacity building. Countries embarking on nuclear power programmes, as well as countries expanding existing programmes, have to meet the challenge of building a technically qualified workforce. A vigorous knowledge transfer programme is key to capacity building - particularly in view of the ageing of experienced professionals in the nuclear field. National and regional safety networks, and ultimately a global safety network will greatly help these efforts. Changes in world markets and technology are having an impact on both

  19. Nuclear safety review requirements for launch approval

    Sholtis, J.A. Jr.; Winchester, R.O.

    1992-01-01

    Use of nuclear power systems in space requires approval which is preceded by extensive safety analysis and review. This careful study allows an informed risk-benefit decision at the highest level of our government. This paper describes the process as it has historically been applied to U.S. isotopic power systems. The Ulysses mission, launched in October 1990, is used to illustrate the process. Expected variations to deal with reactor-power systems are explained

  20. Reactor safety review of permanent changes

    Lam, K.F.

    1997-01-01

    Operational compliance engineers review all changes as part of a change control process. Each change, permanent or temporary, is required to undergo an intricate review process to ensure that the benefits associated with the change outweigh the risk. For permanent changes, it is necessary to ensure that the proposed design meets the nuclear safety requirements, conforms to the licensing requirements and complies with regulatory requirements. In addition, during installation of the permanent change and prior to in-service, a configuration management process is in place to align the change with operating and maintenance documents. (author)

  1. Immunization safety review: influenza vaccines and neurological complications

    Stratton, Kathleen R

    ..., unlike other vaccines. The Immunization Safety Review committee reviewed the data on influenza vaccine and neurological conditions and concluded that the evidence favored rejection of a causal relationship...

  2. Nuclear Safety Review for the Year 2008

    2009-07-01

    Nuclear technologies are increasingly seen as important solutions for meeting a number of challenges. Enabling the peaceful use of nuclear technology to support global energy demands and other human needs must be accompanied by deliberate, internationally-coordinated actions to minimize the potential for nuclear accidents and terrorism. While in recent years, the safety performance of the nuclear industry has been good, it is important to avoid any complacency. The Agency continues to support and promote the global nuclear safety and security regime as a framework for worldwide achievement of high levels of safety and security in nuclear activities. In 2008, three general themes can be observed from the global trends, issues and challenges in nuclear safety: the continuous improvements in strengthening safety worldwide through international cooperation; an expected increase of new entrant nuclear power programmes and the expansion of existing programmes; and safety and security synergy. Regarding continuous improvements to strengthen safety worldwide, the focus was on operating experience feedback and knowledge networking; and self-assessment and peer review. In the areas of new entrant nuclear programmes and expansion of existing nuclear programmes, activities centred on national safety infrastructures; human resources and capacity building; regulatory independence; nuclear incident and emergency preparedness and response; spent fuel and radioactive waste management; and multinational aspects of nuclear activities. In the area of safety and security synergy, in 2008 there was increasing awareness that processes need to be in place to ensure that safety activities do not compromise security and vice versa. As outlined in Safety Fundamentals No. SF-1, the prime responsibility for safety must rest with the person or organization responsible for facilities and activities that give rise to radiation risks. An effective legal and governmental framework for safety

  3. ESRS guidelines for software safety reviews. Reference document for the organization and conduct of Engineering Safety Review Services (ESRS) on software important to safety in nuclear power plants

    2000-01-01

    The IAEA provides safety review services to assist Member States in the application of safety standards and, in particular, to evaluate and facilitate improvements in nuclear power plant safety performance. Complementary to the Operational Safety Review Team (OSART) and the International Regulatory Review Team (IRRT) services are the Engineering Safety Review Services (ESRS), which include reviews of siting, external events and structural safety, design safety, fire safety, ageing management and software safety. Software is of increasing importance to safety in nuclear power plants as the use of computer based equipment and systems, controlled by software, is increasing in new and older plants. Computer based devices are used in both safety related applications (such as process control and monitoring) and safety critical applications (such as reactor protection). Their dependability can only be ensured if a systematic, fully documented and reviewable engineering process is used. The ESRS on software safety are designed to assist a nuclear power plant or a regulatory body of a Member State in the review of documentation relating to the development, application and safety assessment of software embedded in computer based systems important to safety in nuclear power plants. The software safety reviews can be tailored to the specific needs of the requesting organization. Examples of such reviews are: project planning reviews, reviews of specific issues and reviews prior final acceptance. This report gives information on the possible scope of ESRS software safety reviews and guidance on the organization and conduct of the reviews. It is aimed at Member States considering these reviews and IAEA staff and external experts performing the reviews. The ESRS software safety reviews evaluate the degree to which software documents show that the development process and the final product conform to international standards, guidelines and current practices. Recommendations are

  4. Are PSR 0656+14, PSR 0950+08, and PSR 1822-09 gamma ray pulsars?

    Brown, Lawrence E.; Hartmann, Dieter H.

    1993-01-01

    The possible discovery of three new gamma-ray pulsars PSR 0656+14, PSR 0950+08, and PSR 1822-09 (Ma, Lu, Yu, and Young, 1993) in data obtained with the COS-B experiment is reinvestigated using a refined technique for pulsar light curve analysis. The results of this study do not confirm the previously claimed gamma-ray pulsar nature of any of these pulsars. Even when using the standard epoch folding technique in conjunction with energy-dependent acceptance cones, we do not detect pulsed gamma-ray emission from these sources. We suspect that insufficient position accuracy is the cause for the discrepancy between our results and those of Ma et al. (1993). We do not rule out that any one of the three candidates, or all of them, is in fact a gamma-ray pulsar, but their spin properties must differ from those derived by Ma et al. (1993). More work is needed to determine the correct high-energy properties of these three sources.

  5. Safety of human papillomavirus vaccines: a review.

    Stillo, Michela; Carrillo Santisteve, Paloma; Lopalco, Pier Luigi

    2015-05-01

    Between 2006 and 2009, two different human papillomavirus virus (HPV) vaccines were licensed for use: a quadrivalent (qHPVv) and a bivalent (bHPVv) vaccine. Since 2008, HPV vaccination programmes have been implemented in the majority of the industrialized countries. Since 2013, HPV vaccination has been part of the national programs of 66 countries including almost all countries in North America and Western Europe. Despite all the efforts made by individual countries, coverage rates are lower than expected. Vaccine safety represents one of the main concerns associated with the lack of acceptance of HPV vaccination both in the European Union/European Economic Area and elsewhere. Safety data published on bivalent and quadrivalent HPV vaccines, both in pre-licensure and post-licensure phase, are reviewed. Based on the latest scientific evidence, both HPV vaccines seem to be safe. Nevertheless, public concern and rumors about adverse events (AE) represent an important barrier to overcome in order to increase vaccine coverage. Passive surveillance of AEs is an important tool for detecting safety signals, but it should be complemented by activities aimed at assessing the real cause of all suspect AEs. Improved vaccine safety surveillance is the first step for effective communication based on scientific evidence.

  6. Plant safety review from mass criticality accident

    Susanto, B.G.

    2000-01-01

    The review has been done to understand the resent status of the plant in facing postulated mass criticality accident. From the design concept of the plant all the components in the system including functional groups have been designed based on favorable mass/geometry safety principle. The criticality safety for each component is guaranteed because all the dimensions relevant to criticality of the components are smaller than dimensions of 'favorable mass/geometry'. The procedures covering all aspects affecting quality including the safety related are developed and adhered to at all times. Staff are indoctrinated periodically in short training session to warn the important of the safety in process of production. The plant is fully equipped with 6 (six) criticality detectors in strategic places to alert employees whenever the postulated mass criticality accident occur. In the event of Nuclear Emergency Preparedness, PT BATAN TEKNOLOGI has also proposed the organization structure how promptly to report the crisis to Nuclear Energy Control Board (BAPETEN) Indonesia. (author)

  7. Nuclear Safety Review for the Year 2005

    2006-01-01

    In 2005, the Agency and its Director General were awarded the Nobel Peace Prize. The Nobel Committee statement recognizes the Agency's 'efforts to prevent nuclear energy from being used for military purposes and to ensure that nuclear energy for peaceful purposes is used in the safest possible way.' The global nature of safety is reflected in the relevant international legal instruments, both binding conventions and the non-binding codes of conduct currently in place. During the year, the third review meeting of the Contracting Parties to the Convention on Nuclear Safety as well as the third meeting of the representatives of the competent authorities under the Convention on Early Notification of a Nuclear Accident and Convention on Assistance in the Case of a Nuclear Accident or a Radiological Emergency took place. Improvements have been made in national legislation and regulatory infrastructure in many Member States in 2005. However, inadequate safety management and regulatory supervision of nuclear installations and use of ionizing radiation is a continuing issue in many Member States. A continuing challenge is to collect, analyse and disseminate safety experience and knowledge. Nuclear power plant (NPP) operational safety performance remained high throughout the world in 2005. Radiation doses to workers and members of the public due to NPP operation are well below regulatory limits. Personal injury accidents and incidents are among the lowest in industry. There were no accidents that resulted in the release of radiation that could adversely impact the environment. NPPs in many parts of the world have successfully coped with severe natural disaster conditions such as earthquakes, tsunamis, widespread river flooding and hurricanes. However, operational safety performance has been on a plateau for several years and concern has been expressed in many forums regarding the need to guard against complacency in the industry. Research reactors also maintained a good

  8. Nuclear Safety Review for the Year 2010

    2011-07-01

    The Agency, as a leading organization for promoting international cooperation among its Member States, is in a unique position to observe global trends, issues and challenges in nuclear safety and security through a wide variety of activities related to the establishment of safety standards and security guidelines and their application. The contents of this Nuclear Safety Review reflect the emerging nuclear safety trends, issues and challenges for 2010, as well as recapitulate the Agency's activities intended to further strengthen the global nuclear safety and security framework in all areas of nuclear, radiation, waste and transport safety. The accident at the Fukushima Daiichi Nuclear Power Plant, caused by the extraordinary disasters of the earthquake and tsunamis that struck Japan on 11 March 2011, continues to be assessed. As this report focuses on developments in 2010, the accident and its implications are not addressed here, but will be addressed in future reports of the Agency. The international nuclear community maintained a high level of safety performance in 2010. Nuclear power plant safety performance remained high, and indicated an improved trend in the number of emergency shutdowns as well in the level of energy available during these shutdowns. In addition, more States explored or expanded their interests in nuclear power programmes, and more faced the challenge of establishing the required regulatory infrastructure, regulatory supervision and safety management over nuclear installations and the use of ionizing radiation. Issues surrounding radiation protection and radioecology continued as trends in 2010. For example, increased public awareness of exposure to and environmental impacts of naturally occurring radioactive material (NORM) as well as nuclear legacy sites has led to increased public concern. In addition, human resources in radiation protection and radioecology have been lost as a result of retirement and of the migration of experts to

  9. Nuclear Safety Review for the Year 2009

    2010-07-01

    . A growing number of Member States are considering or have expressed interest in developing nuclear power programmes for the first time. Several countries have also embarked on ambitious plans for expanding their current programmes. The Agency's latest projections for the future of nuclear power by 2030 are higher than they were last year. Emerging international cooperative efforts in support of new and expanding nuclear power programmes have focused on many key issues. Such issues include gaps in national safety infrastructures, safety and security synergy and integration, and safety responsibilities and capacities for the various participants in a nuclear power programme, which include operators, regulators, government, suppliers, technical support organizations and relevant international organizations. Continued focus on cooperation for new and expanding nuclear power programmes is underscored by the fact that in some cases plans for nuclear programme development are moving faster than the establishment of the necessary safety infrastructure and capacity. Therefore, it is important that those countries of new and expanding nuclear power programmes actively participate in the global nuclear safety and security regime. As a result of the increasingly multinational nature of today's nuclear business and activities and associated technical and economic benefits, suppliers, operators, regulators and experts communities are making significant efforts towards the standardization and harmonization of equipment, components, methods and processes. As an example, the adoption by the European Union of a nuclear towards a harmonized approach to sustainable nuclear safety infrastructure worldwide. Similarly, international cooperation through conventions and codes of conduct, including associated peer review mechanisms, also provide for harmonized approaches to safety. Establishing and maintaining a regulatory body which is effectively independent in its decision making

  10. CAMEX-3 POLARIMETRIC SCANNING RADIOMETER (PSR) V1

    National Aeronautics and Space Administration — The Polarimetric Scanning Radiometer (PSR) is a versatile airborne microwave imaging radiometer developed by the Georgia Institute of Technology and the NOAA...

  11. Passenger safety, health, and comfort: a review.

    Rayman, R B

    1997-05-01

    Since the birth of aviation medicine approximately 80 yrs ago, practitioners and scientists have given their attention primarily to flight deck crew, cabin crew, and ground support personnel. However, in more recent years we have broadened our horizons to include the safety, health, and comfort of passengers flying commercial aircraft. This will be even more compelling as more passengers take to the air in larger aircraft and flying longer hours to more distant destinations. Further, we can expect to see more older passengers because people in many countries are living longer, healthier lives. The author first discusses the stresses imposed by ordinary commercial flight upon travelers such as airport tumult, barometric pressure changes, immobility, jet lag, noise/ vibration, and radiation. Medical considerations are next addressed describing inflight illness and medical care capability aboard U.S. air carriers. Passenger safety, cabin air quality, and the preventive medicine aspects of air travel are next reviewed in the context of passenger safety, health, and comfort. Recommendations are addressed to regulator agencies, airlines aircraft manufacturers, and the aerospace medicine community.

  12. Nuclear Safety Review for the Year 2010

    NONE

    2011-07-15

    The contents of this Nuclear Safety Review reflect the emerging nuclear safety trends, issues and challenges for 2010, as well as recapitulate the Agency's activities intended to further strengthen the global nuclear safety and security framework in all areas of nuclear, radiation, waste and transport safety. Nuclear power plant safety performance remained high, and indicated an improved trend in the number of emergency shutdowns as well in the level of energy available during these shutdowns. In addition, more States explored or expanded their interests in nuclear power programmes, and more faced the challenge of establishing the required regulatory infrastructure, regulatory supervision and safety management over nuclear installations and the use of ionizing radiation. Issues surrounding radiation protection and radioecology continued as trends in 2010. For example, increased public awareness of exposure to and environmental impacts of naturally occurring radioactive material (NORM) as well as nuclear legacy sites has led to increased public concern. In addition, human resources in radiation protection and radioecology have been lost as a result of retirement and of the migration of experts to other fields. It is clear that safety continues to be a work in progress. The global nuclear power industry continued to require substantial efforts by designers, manufacturers, operators, regulators and other stakeholders to satisfy diverse quality and safety requirements and licensing processes, along with the recognized need in industry and among regulators to standardize and harmonize these requirements and processes. In some cases, plans for nuclear power programme development moved faster than the establishment of the necessary regulatory and safety infrastructure and capacity. To assist Member States in this effort, the Regulatory Cooperation Forum (RCF) was formed in June 2010. The RCF is a regulator-to-regulator forum that optimizes regulatory support from Member

  13. Packaging Review Guide for Reviewing Safety Analysis Reports for Packagings

    DiSabatino, A; Biswas, D; DeMicco, M; Fisher, L E; Hafner, R; Haslam, J; Mok, G; Patel, C; Russell, E

    2007-04-12

    This Packaging Review Guide (PRG) provides guidance for Department of Energy (DOE) review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE Order 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his or her review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. This PRG is generally organized at the section level in a format similar to that recommended in Regulatory Guide 7.9 (RG 7.9). One notable exception is the addition of Section 9 (Quality Assurance), which is not included as a separate chapter in RG 7.9. Within each section, this PRG addresses the technical and regulatory bases for the review, the manner in which the review is accomplished, and findings that are generally applicable for a package that meets the approval standards. This Packaging Review Guide (PRG) provides guidance for DOE review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE O 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. The primary objectives of this PRG are to: (1) Summarize the regulatory requirements for package approval; (2) Describe the technical review procedures by which DOE determines that these requirements have been satisfied; (3) Establish and maintain the quality and uniformity of reviews; (4) Define the base from which to evaluate proposed changes in scope

  14. Periodical safety review of the Goesgen-Daeniken nuclear power plant. Summary, results and evaluation; Periodische Sicherheitsueberpruefung fuer das Kernkraftwerk Goesgen-Daeniken. Zusammenfassung, Ergebnisse und Bewertung

    NONE

    1999-11-15

    The Goesgen nuclear power plant (KKG) received its operational licence on September 9, 1978. The operational start-up of the plant went on into the year 1979, but there was a short interruption because of the accident in the Three Mile Island reactor on March 28, 1979. In May 1985 KKG submitted a request for raising the thermal reactor power from the then 2808 MW to 3002 MW. Based on the examination by the Federal Agency for the Safety of Nuclear Installations (HSK), the Swiss Federal Council granted the licence in two steps: in December 1985 for raising the thermal power to 2900 MW, and, in April 1992, to 3002 MW. The licence for the second step was given under the condition that some more experience was to be gained concerning the fuel rod cladding under higher loading. As part of the yearly re-licensing on restart after fuel assembly reloading, HSK confirmed that the plant status conformed to the legal requirements. In November 1986, HSK asked all Swiss nuclear power plant managers to state their opinions on proposed measures concerning severe accidents. Some of the measures were already in discussion; the Chernobyl accident on April 26, 1986, accelerated their implementation and was also a reason for the introduction of the measures against severe accidents. In this context, KKG carried out a risk study which led to the installation of a filtered pressure release system for the containment. Another consequence of the Chernobyl accident was the introduction of technical Periodical Safety Reviews (PSR) for all operating nuclear power plants. Central points of the PSR are: a) comparison with the continuously improving state-of-the-art of science and technology concerning safety precautions; b) a systematic evaluation of operating experience and plant status; c) the taking into account of probabilistic safety analyses in the overall evaluation of the plant. Within the framework of the examination of the overall plant, HSK also checks how its requirements concerning

  15. Development of regulatory guidance on safety reviews of nuclear power plants in Germany. A survey on accomplished and current PSA activities

    Berg, H.-P.; Froehmel, T.; Goertz, R.; Rehs, B.

    2005-01-01

    The paper describes the key points of the accomplished and current regulatory activities in order to revise PSA guide and the corresponding technical documents in Germany. The regulatory German PSA guide covers the fundamental requirements concerning the performance of PSAs in the frame of comprehensive safety reviews. The technical details regarding the performance of PSA are set out in two technical documents (PSA Methods and PSA Data) that have been developed by a working group of PSA experts (FAK PSA). Based on the experiences from the first series of PSRs, international experiences and the fact that PSR is mandatory since April 2002 revisions of all guides are underway. The first guide to be updated is the PSA guide together with the corresponding technical documents. The working programme and the revision process of FAK PSA was finished at the end of 2004 and the technical documents have recently been republished. (author)

  16. Development of Safety Review Guidance for Research and Training Reactors

    Oh, Kju-Myeng; Shin, Dae-Soo; Ahn, Sang-Kyu; Lee, Hoon-Joo

    2007-01-01

    The KINS already issued the safety review guidance for pressurized LWRs. But the safety review guidance for research and training reactors were not developed. So, the technical standard including safety review guidance for domestic research and training reactors has been applied mutates mutandis to those of nuclear power plants. It is often difficult for the staff to effectively perform the safety review of applications for the permit by the licensee, based on peculiar safety review guidance. The NRC and NSC provide the safety review guidance for test and research reactors and European countries refer to IAEA safety requirements and guides. The safety review guide (SRG) of research and training reactors was developed considering descriptions of the NUREG- 1537 Part 2, previous experiences of safety review and domestic regulations for related facilities. This study provided the safety review guidance for research and training reactors and surveyed the difference of major acceptance criteria or characteristics between the SRG of pressurized light water reactor and research and training reactors

  17. Immunization Safety Review: Thimerosal - Containing Vaccines and Neurodevelopmental Disorders

    Stratton, Kathleen; Gable, Alicia; McCormick, Marie C

    2001-01-01

    In this report, the Immunization Safety Review committee examines the hypothesis of whether or not the use of vaccines containing the preservative thimerosal can cause neurodevelopmental disorders (NDDs...

  18. Assessment of policy issues in nuclear safety regulation according to circumstantial changes

    Chang, Soon Heung; Lee, Byong Ho; Baek, Won Pil; Lee, Kwang Gu; Huh, Gyun Young; Hahn, Young Tae [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    2000-03-15

    The objective of the work is to assess various issues in nuclear safety regulation in consideration of circumstantial changes. Emphasis is given to the safety of operating NPPs. It is concluded that the Periodic Safety Review (PSR) should be implemented in Korea as soon as possible, in harmonization with the regulation for life extension of NPPs. The IAEA guidelines, including 10 year intervals and 11 safety factors, should be used as the basic guidelines. The approach to improve regulatory effectiveness is also reviewed and a transition to 'knowledge-based regulation' is suggested.

  19. Development of a Safety Assessment Information System for the Management of Periodic Safety Assessment Activities

    Song, Tae Young

    2007-01-01

    At present, the 10-year Periodic Safety Review(PSR) has been performing to confirm all the aspects of safety issues for all the operating plants in compliance with domestic nuclear law of article 23, subarticle 3. For each plant, in addition, Probabilistic Safety Assessment(PSA) and Severe Accident Management Guideline(SAMG) are being implemented and revised periodically to reflect the latest safety level according to principle fulfillment of severe accident policy statement. The assessment reports, as one of outcomes from these activities, are submitted into and reviewed by domestic regulatory body. During reviewing (in-office duty) and licensing (regulatory duty) process, a large number of outcomes of which most are the formal technical reports and licensing materials, are inevitably produced. Moreover, repeated review process over the plants can make them accumulated and produce a variety of documents additionally. This circumstance motivates to develop effective tool or system for the management of these reports and related technical documents for the future use in licensing process and for subsequent plant assessments. This paper presents the development status of Safety Assessment Information System(SAIS) which manages safety-related documents of PSR, PSA and SAMG for practical use for experienced engineers in charge of these areas

  20. Development of a Safety Assessment Information System for the Management of Periodic Safety Assessment Activities

    Song, Tae Young [Nuclear Engineering and Technology Institute, Daejeon (Korea, Republic of)

    2007-07-01

    At present, the 10-year Periodic Safety Review(PSR) has been performing to confirm all the aspects of safety issues for all the operating plants in compliance with domestic nuclear law of article 23, subarticle 3. For each plant, in addition, Probabilistic Safety Assessment(PSA) and Severe Accident Management Guideline(SAMG) are being implemented and revised periodically to reflect the latest safety level according to principle fulfillment of severe accident policy statement. The assessment reports, as one of outcomes from these activities, are submitted into and reviewed by domestic regulatory body. During reviewing (in-office duty) and licensing (regulatory duty) process, a large number of outcomes of which most are the formal technical reports and licensing materials, are inevitably produced. Moreover, repeated review process over the plants can make them accumulated and produce a variety of documents additionally. This circumstance motivates to develop effective tool or system for the management of these reports and related technical documents for the future use in licensing process and for subsequent plant assessments. This paper presents the development status of Safety Assessment Information System(SAIS) which manages safety-related documents of PSR, PSA and SAMG for practical use for experienced engineers in charge of these areas.

  1. 78 FR 11902 - Review of Gun Safety Technologies

    2013-02-20

    ... DEPARTMENT OF JUSTICE Office of Justice Programs [OJP (NIJ) Docket No. 1615] Review of Gun Safety...'s Plan to reduce gun violence released on January 16, 2013, the U.S. Department of Justice, Office... emerging gun safety technologies and plans to issue a report on the availability and use of those...

  2. NRU licence extension via integrated safety review

    Mantifel, N. [Atomic Energy of Canada Limited, Chalk River, ON (Canada)

    2014-07-01

    The National Research Reactor, NRU at AECL Chalk River Laboratories achieved first criticality in November 1957. The completion of an Integrated Safety Review (ISR) in 2011, and subsequent Global Assessment Report (GAR), and Integrated Implementation Plan (IIP) has given confidence in the safe and reliable operation of NRU, therefore extending the licensing case to safely and reliably operate NRU until 2021 and beyond (64+ years of operation). The key vehicle to achieve this confidence is the IIP, that resulted from the ISR. NRU's IIP is a 10 year plan that addresses the gaps identified in the ISR between modern codes and standards in a prioritized approach. AECL is currently in year 3 of the IIP execution, is on or ahead of schedule to complete the identified improvements. The IIP in conjunction with a License Condition Handbook has replaced the licensing protocol with the Canadian Nuclear Safety Commission, (CNSC). Execution of the IIP to plan supports the continued safe operation of NRU. The ISR was carried out with the recognition that the NRU reactor is a research and isotope producing reactor approaching license renewal and not a power reactor undergoing refurbishment and life extension. Therefore, the IIP is being executed while NRU continues to deliver on its three missions: production of medical isotopes, support for fuels and materials research, and serving as a high flux neutron source in support of research relying on neutron scattering. The IIP is grouped into 5 Global Issue Groups, (GIGs) to support focused execution. The activities and tasks within the five GIGs are being executed via a matrix organization through the use of the Chalk River Laboratories Corrective Action Program to ensure the assignment of actions, completion and evidence to support closure is documented and retained. This paper discusses the approach taken by AECL to license and ensure safe, reliable operation of NRU until 2021 and beyond. (author)

  3. Review of Public Safety in Viewpoint of Complex Networks

    Gai Chengcheng; Weng Wenguo; Yuan Hongyong

    2010-01-01

    In this paper, a brief review of public safety in viewpoint of complex networks is presented. Public safety incidents are divided into four categories: natural disasters, industry accidents, public health and social security, in which the complex network approaches and theories are need. We review how the complex network methods was developed and used in the studies of the three kinds of public safety incidents. The typical public safety incidents studied by the complex network methods in this paper are introduced, including the natural disaster chains, blackouts on electric power grids and epidemic spreading. Finally, we look ahead to the application prospects of the complex network theory on public safety.

  4. Critical review of safety performance metrics

    Karanikas, Nektarios

    2016-01-01

    Various tools for safety performance measurement have been introduced in order to fulfil the need for safety monitoring in organisations, which is tightly related to their overall performance and achievement of their business goals. Such tools include accident rates, benchmarking, safety culture and

  5. Conducting organizational safety reviews - requirements, methods and experience

    Reiman, T.; Oedewald, P.; Wahlstroem, B.; Rollenhagen, C.; Kahlbom, U.

    2008-03-01

    Organizational safety reviews are part of the safety management process of power plants. They are typically performed after major reorganizations, significant incidents or according to specified review programs. Organizational reviews can also be a part of a benchmarking between organizations that aims to improve work practices. Thus, they are important instruments in proactive safety management and safety culture. Most methods that have been used for organizational reviews are based more on practical considerations than a sound scientific theory of how various organizational or technical issues influence safety. Review practices and methods also vary considerably. The objective of this research is to promote understanding on approaches used in organizational safety reviews as well as to initiate discussion on criteria and methods of organizational assessment. The research identified a set of issues that need to be taken into account when planning and conducting organizational safety reviews. Examples of the issues are definition of appropriate criteria for evaluation, the expertise needed in the assessment and the organizational motivation for conducting the assessment. The study indicates that organizational safety assessments involve plenty of issues and situations where choices have to be made regarding what is considered valid information and a balance has to be struck between focus on various organizational phenomena. It is very important that these choices are based on a sound theoretical framework and that these choices can later be evaluated together with the assessment findings. The research concludes that at its best, the organizational safety reviews can be utilised as a source of information concerning the changing vulnerabilities and the actual safety performance of the organization. In order to do this, certain basic organizational phenomena and assessment issues have to be acknowledged and considered. The research concludes with recommendations on

  6. Conducting organizational safety reviews - requirements, methods and experience

    Reiman, T.; Oedewald, P.; Wahlstroem, B. [Technical Research Centre of Finland, VTT (Finland); Rollenhagen, C. [Royal Institute of Technology, KTH, (Sweden); Kahlbom, U. [RiskPilot (Sweden)

    2008-03-15

    Organizational safety reviews are part of the safety management process of power plants. They are typically performed after major reorganizations, significant incidents or according to specified review programs. Organizational reviews can also be a part of a benchmarking between organizations that aims to improve work practices. Thus, they are important instruments in proactive safety management and safety culture. Most methods that have been used for organizational reviews are based more on practical considerations than a sound scientific theory of how various organizational or technical issues influence safety. Review practices and methods also vary considerably. The objective of this research is to promote understanding on approaches used in organizational safety reviews as well as to initiate discussion on criteria and methods of organizational assessment. The research identified a set of issues that need to be taken into account when planning and conducting organizational safety reviews. Examples of the issues are definition of appropriate criteria for evaluation, the expertise needed in the assessment and the organizational motivation for conducting the assessment. The study indicates that organizational safety assessments involve plenty of issues and situations where choices have to be made regarding what is considered valid information and a balance has to be struck between focus on various organizational phenomena. It is very important that these choices are based on a sound theoretical framework and that these choices can later be evaluated together with the assessment findings. The research concludes that at its best, the organizational safety reviews can be utilised as a source of information concerning the changing vulnerabilities and the actual safety performance of the organization. In order to do this, certain basic organizational phenomena and assessment issues have to be acknowledged and considered. The research concludes with recommendations on

  7. What ionizes the interstellar hydrogen toward PSR 0950 + 08 and PSR 0823 + 26?

    Reynolds, R.J.

    1990-01-01

    Neither H II regions around nearby B stars nor known white dwarf stars can account for the free electron column densities along two well-defined line segments to the pulsars PSR 0950 + 08 and PSR 0823 + 26. The presence of the ionized gas seems to imply either (1) very long mean free path lengths for the absorption of Lyman continuum photons within the ISM (thereby suggesting a very different morphology for interstellar H I from that of the conventional view); or (2) Lyman continuum luminosities for early B or hot white dwarf stars that are more than an order of magnitude larger than currently accepted values; or (3) an additional and as yet unknown ionization source within the Galactic disk. 54 refs

  8. IRSN safety research carried out for reviewing safety cases

    Serres, Ch.

    2010-01-01

    Christophe Serres from IRSN (France) described the independent role of the IRSN regarding research related to nuclear safety in the context of the French Planning Act of 28 June 2006 foreseeing a licence application to be submitted in 2015 for the creation of a deep geological repository. IRSN research programme is organised along research activities devoted to addressing independently-identified k ey safety issues . These 'key issues' should also be of prime concern for the implementer since they relate to the demonstration of the overall safety of the repository, and the level of funding that the implementer should afford to research activities of concern for safety. He explained that the quality and independency of the research programme carried out by IRSN allow building and improving a set of scientific knowledge and technical skills that serves the public mission of delivering technical appraisal and advice, e.g., on behalf of the national safety authority. In particular they contribute to improving the decisional process by making possible scientific dialogue with stakeholders independently from regulator or implementer. The current IRSN R and D programme is developed along the following lines: - Test the adequacy of experimental methods for which feedback is not sufficient. - Develop basic scientific knowledge in the fields where there is a need for better understanding of complex phenomena and interactions. - Develop and use numerical modelling tools to support studies on complex phenomena and interactions. - Perform specific experimental tests aiming at assessing the key parameters that may warrant the performances of the different components of the repository. These studies are carried out by means of experiments performed either at IRSN surface laboratories, or in the Tournemire Experimental Station (TES), an underground facility operated by IRSN in the south-east of France. Targeted actions on research related to operational safety and reversibility

  9. Design review report for modifications to RMCS safety class equipment

    Corbett, J.E.

    1997-01-01

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable

  10. Design review report for modifications to RMCS safety class equipment

    Corbett, J.E.

    1997-05-30

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable.

  11. US nuclear safety. Review and experience

    Hanauer, S.H.

    1977-01-01

    The paper deals with the evolution of reactor safety principles, design bases, regulatory requirements, and experience in the United States. Safety concerns have evolved over the years, from reactivity transients and shut-down systems, to blowdowns and containment, to severe design basis accidents and mitigating systems, to the performance of actual materials, systems and humans. The primary safety concerns of one epoch have been superseded in considerable measure by those of later times. Successive plateaus of technical understanding are achieved by solutions being found to earlier problems. Design studies, research, operating experience and regulatory imperatives all contribute to the increased understanding and thus to the safety improvements adopted and accepted. The improvement of safety with time, and the ability of existing reactors to operate safely in the face of new concerns, has confirmed the correctness and usefulness of the defence-in-depth approach and safety margins used in safety design in the United States of America. A regulatory programme such as the one in the United States justifies its great cost by its important contributions to safety. Yet only the designers, constructors and operators of nuclear power plants can actually achieve public safety. The regulatory programme audits, assesses and spot-checks the actual work. Since neither materials nor human beings are flawless, mistakes will be made; that is why defence-in-depth and safety margins are provided. The regulatory programme should enhance safety by decreasing the frequency of uncorrected mistakes. Maintenance of public safety also requires technical and managerial competence and attention in the organizations responsible for nuclear plants as well as regulatory organizations. (author)

  12. Safety Review Committee - Annual Report 1991-1992

    1993-01-01

    During the year under review. The Safety Review Committee (SRC) assessed the safety of ANSTO's operations. This was done by site visits, examination of documentation and briefing by ANSTO officers responsible for particular operations, and includes HIFAR and Moata reactors, radioisotope production, packing and dispatch, radioactive waste management practices, occupational health and safety activities and ANSTO's arrangements for public health and safety beyond the site. This report describes the activities and findings of the SRC during the year ending 30 June 1992. 8 figs., ills

  13. On some aspects of nuclear safety surveillance and review

    Li Ganjie; Zhu Hong; Zhou Shanyuan

    2004-01-01

    Five aspects of the nuclear safety surveillance and review are discussed: Strict implementation of nuclear safety regulation, making the nuclear safety surveillance and review more normalization, procedurization, scientific decision-making; Strictly requiring the applicant to comply with the requirements of codes, do not allowing the utilization of mixing of codes; Properly controlling the strictness for the review on significant non-conformance; Strengthening the co-operation between regional offices and technical support units, Properly treat the relations between administrational management unit and technical support units. (authors)

  14. Assessment of policy issues in nuclear safety regulation according to circumstantial changes

    Chang, Soon Heung; Chang, Soon Heung; Lee, Byong Ho; Baek, Won Pil; Roh, Chang Hyun; Lee, Kwang Gu; Kim, Hong Chae; Lee, Yong Ho [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    1999-03-15

    The objective of the work is to assess various issues in nuclear safety regulation in consideration of circumstantial changes. Emphasis is given to the safety of operating NPPs. It is concluded that the Periodic Safety Review (PSR) should be implemented in Korea as soon as possible, in harmonization with the regulation for life extension of NPPs. The IAEA guidelines, including 10 year intervals and 11 safety factors, should be used as the basic guidelines. Efforts are also required to cope with other circumstantial changes such as the establishment of International Nuclear Regulators Association (INRA)

  15. Detailed Safety Review of Anthrax Vaccine Adsorbed

    2001-01-01

    To date, 18 human studies have assessed the safety of anthrax vaccination. These studies, some stretching back almost 50 years, reported adverse events after vaccination in varying degrees of detail...

  16. Patient safety in otolaryngology: a descriptive review.

    Danino, Julian; Muzaffar, Jameel; Metcalfe, Chris; Coulson, Chris

    2017-03-01

    Human evaluation and judgement may include errors that can have disastrous results. Within medicine and healthcare there has been slow progress towards major changes in safety. Healthcare lags behind other specialised industries, such as aviation and nuclear power, where there have been significant improvements in overall safety, especially in reducing risk of errors. Following several high profile cases in the USA during the 1990s, a report titled "To Err Is Human: Building a Safer Health System" was published. The report extrapolated that in the USA approximately 50,000 to 100,000 patients may die each year as a result of medical errors. Traditionally otolaryngology has always been regarded as a "safe specialty". A study in the USA in 2004 inferred that there may be 2600 cases of major morbidity and 165 deaths within the specialty. MEDLINE via PubMed interface was searched for English language articles published between 2000 and 2012. Each combined two or three of the keywords noted earlier. Limitations are related to several generic topics within patient safety in otolaryngology. Other areas covered have been current relevant topics due to recent interest or new advances in technology. There has been a heightened awareness within the healthcare community of patient safety; it has become a major priority. Focus has shifted from apportioning blame to prevention of the errors and implementation of patient safety mechanisms in healthcare delivery. Type of Errors can be divided into errors due to action and errors due to knowledge or planning. In healthcare there are several factors that may influence adverse events and patient safety. Although technology may improve patient safety, it also introduces new sources of error. The ability to work with people allows for the increase in safety netting. Team working has been shown to have a beneficial effect on patient safety. Any field of work involving human decision-making will always have a risk of error. Within

  17. A review of the nuclear safety activities in Italy

    Merelli, A.

    1989-01-01

    A review of research programs carried out in Italy in the field of nuclear reactor safety was done in 1986, in the frame of the activities of the Commission of the European Communities, the International Energy Agency and the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The report contains information on these programs, as well as information on the organization of safety research in Italy and the evolution of safety research programs

  18. Tank waste remediation system nuclear criticality safety program management review

    BRADY RAAP, M.C.

    1999-01-01

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999

  19. Nuclear Safety: Technical progress review, January--March 1989

    Silver, E. G. [ed.

    1989-01-01

    This review journal covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  20. Nuclear Safety Review for the Year 2004

    2005-08-01

    In the nuclear area, challenges continue to emerge from the globalization of issues related to safety, technology, business, information, communication and security. Scientific advances and operational experience in nuclear, radiation, waste and transport technology are providing new opportunities to continuously improve safety and security by utilizing synergies between safety and security. The prime responsibility for nuclear, radiation, waste and transport safety rests with users and national governments. The Agency continues to support a Global Nuclear Safety Regime based on strong national safety infrastructures and widespread subscription to international legal instruments to maintain high levels of safety worldwide. Central to the Agency's role are the establishment of international safety standards and the provision for applying these standards, as well as the promotion of sharing information through managing the knowledge base. Nuclear power plant operational safety performance remains high throughout the world. Challenges facing the nuclear power industry include avoiding complacency, maintaining the necessary infrastructure, nuclear power plant ageing and long-term operation, as well as new reactor designs and construction. The research reactor community has a long history of safe operation. However nearly two-thirds of the world's operating research reactors are now over 30 years old and face safety and security challenges. In 2004, the Board of Governors approved the Code of Conduct on the Safety of Research Reactors to help address these challenges. In 2004, there was international consensus on radionuclide activity concentrations in materials below which regulatory controls need not apply. Key occupational radiation protection performance indicators continued to improve in 2004. Challenges include new medical practices where workers can receive high exposures, industrial radiography and worker exposure to naturally occurring radioactive material. New

  1. Patient Safety and Workplace Bullying: An Integrative Review.

    Houck, Noreen M; Colbert, Alison M

    Workplace bullying is strongly associated with negative nursing outcomes, such as work dissatisfaction, turnover, and intent to leave; however, results of studies examining associations with specific patient safety outcomes are limited or nonspecific. This integrative review explores and synthesizes the published articles that address the impact of workplace nurse bullying on patient safety.

  2. A review of models relevant to road safety.

    Hughes, B P; Newstead, S; Anund, A; Shu, C C; Falkmer, T

    2015-01-01

    It is estimated that more than 1.2 million people die worldwide as a result of road traffic crashes and some 50 million are injured per annum. At present some Western countries' road safety strategies and countermeasures claim to have developed into 'Safe Systems' models to address the effects of road related crashes. Well-constructed models encourage effective strategies to improve road safety. This review aimed to identify and summarise concise descriptions, or 'models' of safety. The review covers information from a wide variety of fields and contexts including transport, occupational safety, food industry, education, construction and health. The information from 2620 candidate references were selected and summarised in 121 examples of different types of model and contents. The language of safety models and systems was found to be inconsistent. Each model provided additional information regarding style, purpose, complexity and diversity. In total, seven types of models were identified. The categorisation of models was done on a high level with a variation of details in each group and without a complete, simple and rational description. The models identified in this review are likely to be adaptable to road safety and some of them have previously been used. None of systems theory, safety management systems, the risk management approach, or safety culture was commonly or thoroughly applied to road safety. It is concluded that these approaches have the potential to reduce road trauma. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Nulcear Safety: Technical progress review, October--December 1988

    Silver, E G [ed.

    1988-01-01

    Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  4. Nuclear Safety: Volume 29, No. 3: Technical progress review

    Silver, E G [ed.

    1988-07-01

    Nuclear Safety is a review journal that covers significant development in the field of nuclear safety. Its scope included the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Individual papers have been cataloged separately.

  5. Safety review and approval process for the TFTR

    Levine, J.D.; Howe, H.J.; Howe, K.E.

    1983-01-01

    The design, construction, and operation of the Tokamak Fusion Test Reactor (TFTR) has undergone an extensive safety and enviromental analysis involving Princeton Plasma Physics Laboratory (PPPL), the U.S. Department of Energy (DOE), the Ebasco/Grumman Industrial Subcontractor Team, and other organizations. This analysis, which is continuing during the TFTR operational phase, has been facilitated by the preparation, review and approval of several documents, including an Environmental Statement (Draft and Final), a Preliminary Safety Analysis Report (PSAR), a Final Safety Analysis Report (FSAR), Operations Safety Requirements (OSRs) and Safety Requirements (SRs), and various Operating and Maintenance Manuals. Through TFTR Safety Group participation in formal system design evaluations, change control boards, and reviews of project procurement and installation documentation, the TFTR Management Configuration Control System assures that all aspects of the project, including proposed design, installation and operational changes, receive prompt and thorough safety analyses. These efforts will continue as the TFTR Program moves into the neutral beam and D-T operational phases. The safety review and approval experience that has been acquired on the TFTR Project should serve as a foundation for similar efforts on future fusion devices

  6. Safety review of experiments at Albuquerque Operations Office

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  7. Russian Minatom nuclear safety research strategic plan. An international review

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  8. Status of PSR [Proton Storage Ring

    Macek, R.J.

    1989-01-01

    The Los Alamos Proton Storage Ring (PSR) now operates with 35μA at 20-Hz pulse repetition rate. Beam availability during 1988 suffered because of a number of problems with hardware reliability and from narrow operating margins for beam spill in the extraction line. A strong effort is underway to improve reliability with an eventual goal of obtaining beam availability in excess of 75%. Beam losses and the resulting component activation have limited operating currents to their present values. In detailed studies of the problem, loss rates were found to be approximately proportional to the circulating current and can be understood by a detailed accounting of emittance growth in the two-step injection process along with Coulomb scattering of the stored beam during multiple traversals of the injection foil. It is now apparent that the key to reducing losses is in reducing the number of foil traversals. A program of upgrades to reduce losses and improve the operating current is being planned. 8 refs., 16 figs

  9. Safety evaluation review of the prototype license application safety analysis report

    1991-08-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the belowground vault (BGV) alternative method of low-level radioactive waste disposal. In Volume 1 of NUREG-1375, the NRC staff provided the safety review results for an earth-mounded concrete bunker PLASAR. In the current report, the staff focused its review on the design, construction, and operational aspects of the BGV PLASAR. The staff developed review comments and questions using the Standard Review Plan (SRP), Rev. 1 (NUREG-1200) as the basis for evaluating the acceptability of the information provided in the BGV PLASAR. The detailed review comments provided in this report are intended to be useful guidance to facility developers and State regulators in addressing issues likely to be encountered in the review of a license application for a low-level-waste disposal facility. 44 refs

  10. Activity of safety review for the facilities using nuclear material (2). Safety review results and maintenance experiences for hot laboratories

    Amagai, Tomio; Fujishima, Tadatsune; Mizukoshi, Yasutaka; Sakamoto, Naoki; Ohmori, Tsuyoshi

    2009-01-01

    In the site of O-arai Research and Development Center of Japan Atomic Energy Agency (JAEA), five hot laboratories for post-irradiation examination and development of plutonium fuels are operated more than 30 years. A safety review method for preventive maintenance on these hot laboratories includes test facilities and devices are established in 2003. After that, the safety review of these facilities and devices are done and taken the necessary maintenance based on the results in each year. In 2008, 372 test facilities and devices in these hot laboratories were checked and reviewed by this method. As a results of the safety review, repair issues of 38 facilities of above 372 facilities were resolved. This report shows the review results and maintenance experiences based on the results. (author)

  11. Medication safety programs in primary care: a scoping review.

    Khalil, Hanan; Shahid, Monica; Roughead, Libby

    2017-10-01

    Medication safety plays an essential role in all healthcare organizations; improving this area is paramount to quality and safety of any wider healthcare program. While several medication safety programs in the hospital setting have been described and the associated impact on patient safety evaluated, no systematic reviews have described the impact of medication safety programs in the primary care setting. A preliminary search of the literature demonstrated that no systematic reviews, meta-analysis or scoping reviews have reported on medication safety programs in primary care; instead they have focused on specific interventions such as medication reconciliation or computerized physician order entry. This scoping review sought to map the current medication safety programs used in primary care. The current scoping review sought to examine the characteristics of medication safety programs in the primary care setting and to map evidence on the outcome measures used to assess the effectiveness of medication safety programs in improving patient safety. The current review considered participants of any age and any condition using care obtained from any primary care services. We considered studies that focussed on the characteristics of medication safety programs and the outcome measures used to measure the effectiveness of these programs on patient safety in the primary care setting. The context of this review was primary care settings, primary healthcare organizations, general practitioner clinics, outpatient clinics and any other clinics that do not classify patients as inpatients. We considered all quantitative studied published in English. A three-step search strategy was utilized in this review. Data were extracted from the included studies to address the review question. The data extracted included type of medication safety program, author, country of origin, aims and purpose of the study, study population, method, comparator, context, main findings and outcome

  12. Shielding modefication and safety review on Mutsu

    Osanai, Masao

    1978-01-01

    The Japan Atomic Energy Commission requests strongly to repair the shielding and make general safety inspection on Mutsu after an accident of radiation leakage from the reactor. The content and procedure of this repair of shielding and general safety inspection are outlined. The neutron leakage location in the reactor proper, technical shielding investigation, conceptual design of relating shielding repair, the mock up test of the shielding on the neutron streaming, the final conceptual design of repair, the relating research and development experiment and the detailed basic design of repair are explained, comparing the original design and the modified one. The modified design depends on the experimental results of neutron streaming test between the reactor vessel and the primary shield. As for the general safety inspection, the functional test of control rod driving mechanism and other main components, the flaw detection for heat transfer tubes of the steam generator and primary cooling pipings are carried out in hardwares, and the integrity analysis of fuel assemblies, stress corrosion cracking of fuel claddings and primary cooling pipings, the natural circulation analysis of primary cooling system, and integrity check of the heat transfer tubes of steam generator are carried out in softwares. The burst test and the strength test after high temperature oxidation for fuel claddings made of stainless steel were carried out. (Nakai, Y.)

  13. Using systematic review in occupational safety and health.

    Howard, John; Piacentino, John; MacMahon, Kathleen; Schulte, Paul

    2017-11-01

    Evaluation of scientific evidence is critical in developing recommendations to reduce risk. Healthcare was the first scientific field to employ a systematic review approach for synthesizing research findings to support evidence-based decision-making and it is still the largest producer and consumer of systematic reviews. Systematic reviews in the field of occupational safety and health are being conducted, but more widespread use and adoption would strengthen assessments. In 2016, NIOSH asked RAND to develop a framework for applying the traditional systematic review elements to the field of occupational safety and health. This paper describes how essential systematic review elements can be adapted for use in occupational systematic reviews to enhance their scientific quality, objectivity, transparency, reliability, utility, and acceptability. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  14. IRSN safety research carried out for reviewing geological disposal safety case

    Serres, Christophe; Besnus, Francois; Gay, Didier

    2010-01-01

    The Radiation Protection and Nuclear Safety Institute develops a research programme on scientific issues related to geological disposal safety in order to supporting the technical assessment carried out in the framework of the regulatory review process. This research programme is organised along key safety questions that deal with various scientific disciplines as geology, hydrogeology, mechanics, geochemistry or physics and is implemented in national and international partnerships. It aims at providing IRSN with sufficient independent knowledge and scientific skills in order to be able to assess whether the scientific results gained by the waste management organisation and their integration for demonstrating the safety of the geological disposal are acceptable with regard to the safety issues to be dealt with in the Safety Case. (author)

  15. A probabilistic safety assessment PEER review: Case study on the use of probabilistic safety assessment for safety decisions

    1989-10-01

    The purpose of this case study is to illustrate, using an actual example, the organizing and carrying out of an independent peer review of a draft full-scope (level 3) probabilistic safety assessment. The specific findings of the peer review are of less importance than the approach taken, the interaction between sponsor and study team, and the technical and administrative issues that can arise during a peer review. This case study will examine the following issues: how the scope of the peer review was established, based on how it was to be used by the review sponsoring body; how the level of effort was determined, and what this determination meant for the technical quality of the review; how the team of peer reviewers was selected; how the review itself was carried out; what findings were made; what was done with these findings by both the review sponsoring body and the PSA analysis team. 9 refs, 2 figs, 1 tab

  16. Safety reviews of the Brazilian multipurpose reactor

    Soares, Humberto Vitor

    2014-01-01

    This work presents a model developed for thermal hydraulic (TH) simulation of the Multipurpose Brazilian Reactor (RMB), whose Brazilian proposal for design, construction and operation was established in 2007. This reactor has as main proposed the production of radioisotopes for use in exams of nuclear medicine, material tests and utilization of neutrons beams. Besides of the TH modeling and safety analysis of the reactor, the application of a methodology to perform coupled calculation thermal-hydraulic/neutron kinetic (TH/NK) is also presented. Initially, the RMB was modeled in the safety analysis RELAP5 code. This code performs the thermal hydraulic calculation using point kinetics. Subsequently, the model was adapted and verified to the RELAP5-3D© code. This code performs the process of internal coupling through the option of nodal neutron kinetics calculation using the NESTLE code which solves the neutron diffusion equation. To generate the neutronic group constants, which are macroscopic cross sections that serve as input data for the neutronic codes, it was used the WIMSD-5B cell calculation code. The neutron analysis code PARCS was also used to model the 3D RMB core in order to compare the results of radial and axial average power distribution with the results generated by RELAP5-3D© code and with the available results of the CITATION neutron kinetic code. The safety analyses demonstrated safe behavior of the reactor through situations of possible transients. The 3D coupled calculations to the steady state operation also showed expected behavior, as well as the RMB neutronic analyzes performed with the codes NESTLE and PARCS.(author)

  17. WNP-2 outage safety review methodology

    Chiang, Albert; Fu, James

    2004-01-01

    A practical and versatile method was developed in the flow chart and checklist forms to show the defense-in-depth for various key safety functions of a nuclear power plant during shutdown. Using four different colors (green, yellow, orange, and red) for indication of levels of defense-in-depth is visually impressive, easy to understand, and was adopted by the outage management personnel as a convenient reference tool for maintenance activity planning before the outage, and schedule changes during the outage. This paper describes the method and its application at Washington Public Power Supply System's Nuclear Project 2 (WNP-2). (author)

  18. PSR B0826-34: SOMETIMES A ROTATING RADIO TRANSIENT

    Esamdin, A.; Niu, H. B.; Abdurixit, D.; Manchester, R. N.

    2012-01-01

    We report on the detection of sporadic, strong single pulses coexisting with a periodic weak emission in the duration of weak mode of PSR B0826–34. The intensities and durations of these pulses are comparable with those of the subpulses in the strong mode, and these pulses are distributed within the phase ranges of the main-pulse and interpulse of the strong-mode average profile. These results suggest that there is very possibly sporadic, very short timescale turn-on of strong-mode emission during the weak-mode state of the pulsar. The emission features of the bursts of strong pulses of PSR B0826–34 during its weak-mode state are similar to those of the rotating radio transients (RRATs). PSR B0826–34 is the second known pulsar, which oscillates between pulsar-like and RRAT-like modes.

  19. Ginga observations of the 50 millisecond pulsar PSR 0540 - 69

    Nagase, F.; Deeter, J.; Lewis, W.; Dotani, T.; Makino, F.

    1990-01-01

    Extensive Ginga observations of PSR 0540 - 69, the Crab-like 50-msec pulsar in the LMC, have been obtained as a side benefit of a pulsar search project for SN 1987A. Through a coherent pulse-timing analysis of data from 46 separate days between July 1987 and October 1988, precise values have been obtained for the pulse frequency and its first and second derivatives. From these values, a braking index of n = 2.02 + or = 0.01 is obtained for PSR 0540 - 69. This is the first accurate measurement of a pulsar braking index from X-ray observations and the third overall. The braking index is much smaller than those previously determined for the Crab pulsar (n = 2.51) and PSR 1509 - 58 (n = 2.83). 24 refs

  20. Safety Review related to Commercial Grade Digital Equipment in Safety System

    Yu, Yeongjin; Park, Hyunshin; Yu, Yeongjin; Lee, Jaeheung

    2013-01-01

    The upgrades or replacement of I and C systems on safety system typically involve digital equipment developed in accordance with non-nuclear standards. However, the use of commercial grade digital equipment could include the vulnerability for software common-mode failure, electromagnetic interference and unanticipated problems. Although guidelines and standards for dedication methods of commercial grade digital equipment are provided, there are some difficulties to apply the methods to commercial grade digital equipment for safety system. This paper focuses on regulatory guidelines and relevant documents for commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. This paper focuses on KINS regulatory guides and relevant documents for dedication of commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. Dedication including critical characteristics is required to use the commercial grade digital equipment on safety system in accordance with KEPIC ENB 6370 and EPRI TR-106439. The dedication process should be controlled in a configuration management process. Appropriate methods, criteria and evaluation result should be provided to verify acceptability of the commercial digital equipment used for safety function

  1. Desonide: a review of formulations, efficacy and safety.

    Kahanek, Nr; Gelbard, Cg; Hebert, Aa

    2008-07-01

    Desonide is a low-potency topical corticosteroid that has been used for decades in the treatment of steroid-responsive dermatoses. The favorable safety profile of this topical agent makes it ideal for patients of all ages. This article provides a review of desonide's history, pharmacodynamic properties, vehicle technology, efficacy and safety. Randomized controlled trials, as well as open-label and non-comparative studies, case series and reports, experimental models, and data from the Galderma pharmacovigiliance program were reviewed in order to address the clinical efficacy and safety of desonide. Clinical efficacy and safety have been proven in multiple clinical trials. In addition to cream, lotion and ointment formulations, the recently developed hydrogel and foam preparations have increased desonide's versatility and patient tolerability.

  2. Safety reviews of next-generation light-water reactors

    Kudrick, J.A.; Wilson, J.N.

    1997-01-01

    The Nuclear Regulatory Commission (NRC) is reviewing three applications for design certification under its new licensing process. The U.S. Advanced Boiling Water Reactor (ABWR) and System 80+ designs have received final design approvals. The AP600 design review is continuing. The goals of design certification are to achieve early resolution of safety issues and to provide a more stable and predictable licensing process. NRC also reviewed the Utility Requirements Document (URD) of the Electric Power Research Institute (EPRI) and determined that its guidance does not conflict with NRC requirements. This review led to the identification and resolution of many generic safety issues. The NRC determined that next-generation reactor designs should achieve a higher level of safety for selected technical and severe accident issues. Accordingly, NRC developed new review standards for these designs based on (1) operating experience, including the accident at Three Mile Island, Unit 2; (2) the results of probabilistic risk assessments of current and next-generation reactor designs; (3) early efforts on severe accident rulemaking; and (4) research conducted to address previously identified generic safety issues. The additional standards were used during the individual design reviews and the resolutions are documented in the design certification rules. 12 refs

  3. Review of the German Reactor Safety Study

    Bayer, A.

    1980-01-01

    The accident risks in German nuclear power plants are reviewed. Parameters influencing the extent and consequences of an accident are differentiated. Risks of normal operation, war, and sabotage have not been considered. Measures taken by the operating shaft in the course of an accident are taken into account. The knowledge thus gained can be applied in the planning of emergency measures. (DG) [de

  4. Electron cloud diagnostics in use at the Los Alamos PSR

    Macek, R. J.; Browman, A.; Borden, M.; Fitzgerald, D.; Wang, T. S.; Zaugg, T.; Harkay, K.; Rosenberg, R.

    2003-01-01

    A variety of electron cloud diagnostics have been deployed at the Los Alamos Proton Storage Ring (PSR) to detect, measure, and characterize the electron cloud generated in this high intensity, long bunch accumulator ring. These include a version of the ANL-developed retarding field analyzers (RFA) augmented with LANL-developed electronics, a variant of the RFA denoted as the electron sweeping diagnostic (ESD), biased collection plates, and gas pulse measuring devices. The designs and experience with the performance and applicability to PSR are discussed

  5. Safety review on unit testing of safety system software of nuclear power plant

    Liu Le; Zhang Qi

    2013-01-01

    Software unit testing has an important place in the testing of safety system software of nuclear power plants, and in the wider scope of the verification and validation. It is a comprehensive, systematic process, and its documentation shall meet the related requirements. When reviewing software unit testing, attention should be paid to the coverage of software safety requirements, the coverage of software internal structure, and the independence of the work. (authors)

  6. Review of actinide nitride properties with focus on safety aspects

    Albiol, Thierry [CEA Cadarache, St Paul Lez Durance Cedex (France); Arai, Yasuo [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-12-01

    This report provides a review of the potential advantages of using actinide nitrides as fuels and/or targets for nuclear waste transmutation. Then a summary of available properties of actinide nitrides is given. Results from irradiation experiments are reviewed and safety relevant aspects of nitride fuels are discussed, including design basis accidents (transients) and severe (core disruptive) accidents. Anyway, as rather few safety studies are currently available and as many basic physical data are still missing for some actinide nitrides, complementary studies are proposed. (author)

  7. Review of design criteria and safety analysis of safety class electric building for fuel test loop

    Kim, J. Y.

    1998-02-01

    Steady state fuel test loop will be equipped in HANARO to obtain the development and betterment of advanced fuel and materials through the irradiation tests. HANARO fuel test loop was designed for CANDU and PWR fuel testing. Safety related system of Fuel Test Loop such as emergency cooling water system, component cooling water system, safety ventilation system, high energy line break mitigation system and remote control room was required 1E class electric supply to meet the safety operation in accordance with related code. Therefore, FTL electric building was designed to construction and install the related equipment based on seismic category I. The objective of this study is to review the design criteria and analysis the safety function of safety class electric building for fuel test loop, and this results will become guidance for the irradiation testing in future. (author). 10 refs., 6 tabs., 30 figs.

  8. IAEA Completes Safety Review at Czech Nuclear Power Plant

    2012-01-01

    Full text: An international team of nuclear safety experts, led by the International Atomic Energy Agency (IAEA), today completed a review of safety practices at Temelin Nuclear Power Station in the Czech Republic. The team highlighted the Power Plant's good practices and also recommended improvements to some safety measures. At the request of the Government of the Czech Republic, the IAEA assembled a team of nuclear installation safety experts to send an Operational Safety Review Team (OSART) to the Power Plant, and the mission was conducted from 5 to 22 November 2012. The team was comprised of experts from Brazil, Hungary, Slovakia, South Africa, Sweden, Ukraine and the United Kingdom. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the Plant's overall safety status. The team at Temelin conducted an in-depth review of the functions essential to the safe operation of the Power Plant, which are under the responsibility of the site's management. The review covered the areas of management, organization and administration; operations; maintenance; technical support; operating experience; radiation protection; chemistry; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of potential application elsewhere. Examples include the following: - The Power Plant has adopted effective computer software to improve the efficiency of the plant to prepare and isolate equipment for maintenance; - The Power Plant undertakes measures to control precisely the chemical parameters that limit corrosion in the reactor's coolant system, which in turn reduce radiation exposure to the workforce; and - The Temelin

  9. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review

    Hall, Louise H.; Johnson, Judith; Watt, Ian; Tsipa, Anastasia; O’Connor, Daryl B.

    2016-01-01

    Objective To determine whether there is an association between healthcare professionals’ wellbeing and burnout, with patient safety. Design Systematic research review. Data Sources PsychInfo (1806 to July 2015), Medline (1946 to July 2015), Embase (1947 to July 2015) and Scopus (1823 to July 2015) were searched, along with reference lists of eligible articles. Eligibility Criteria for Selecting Studies Quantitative, empirical studies that included i) either a measure of wellbeing or burnout, and ii) patient safety, in healthcare staff populations. Results Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all) subscales of the burnout measures employed, and patient safety. Conclusions Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed. Implications This review illustrates the need for healthcare organisations to consider improving employees’ mental health as well as creating safer work environments when planning interventions to improve patient safety. Systematic Review Registration PROSPERO registration number: CRD42015023340. PMID:27391946

  10. Book review: Safety of Biologics Therapy

    Robak T

    2017-01-01

    Full Text Available Tadeusz Robak Department of Hematology, Medical University of Lodz and Copernicus Memorial Hospital, Lodz, PolandSafety of Biologics Therapy: Monoclonal Antibodies, Cytokines, Fusion Proteins, Hormones, Enzymes, Coagulation Proteins, Vaccines, Botulinum Toxins (Cham, Switzerland: Springer International Publishing; 2016 by Brian A Baldo from the Molecular Immunology Unit, Kolling Institute of Medical Research, Royal North Shore Hospital of Sydney, and the Department of Medicine, University of Sydney, Australia, is a book that belongs on the shelf of everyone in the field of biologic therapies research and clinical practice. In writing this book, the author’s intention was to produce an up-to-date text book on approved biologic therapies, as far as that is possible in this time of rapidly evolving developments in biotherapeutic research and the introduction of new and novel agents for clinical use.The monograph comprises 610 pages in 13 chapters, each including a summary and further reading suggestions. All chapters include a discussion of basic and clinical material. Well-designed, comprehensive tables and color figures are present throughout the book. The book itself examines the biologic products that have regulatory approval in the USA and/or European Union and that show every indication of remaining important therapies. It covers in great detail all the latest work on peptide hormones and enzymes, monoclonal antibodies, fusion proteins, and cytokine therapies. Beyond that, it also presents the latest information on blood coagulation proteins, vaccines, botulinum neurotoxins, and biosimilars. 

  11. The spin histories of PSR1821-24 in M28 and PSR1951+32 in CTB80

    White, N.E.; Stella, L.

    1988-01-01

    The spin histories of the 3.05-ms pulsar PSR 1821-24 in the globular cluster M28 and the pulsar PSR 1951 + 32 in the supernova remnant C + B80, show that the equation for the minimum possible period for the spin-up by accretion of an accreting magnetized neutron star is not correct. Also the equation should not be considered a 'hard' barrier when considering the magnetic field-period distribution of recycled radio pulsars. The rapid rotation period and period derivative of both pulsars are consistent with both having undergone a previous interval of accretion. (U.K.)

  12. Safety review for seismic qualification on nuclear power plant equipment

    Fang Qingxian

    1995-01-01

    The standards and requirements for seismic qualification of nuclear power plant's component have been fully addressed, including the scope of seismic qualification, the approach and the method of common seismic qualification, the procedure of the seismic tests, and the criteria for the seismic qualification review. The problems discovered in the safety review and the solution for these problems and some other issues are also discussed

  13. A Systematic Review of the Safety of Lisdexamfetamine Dimesylate

    Coghill, David R.; Caballero, Beatriz; Sorooshian, Shaw; Civil, Richard

    2014-01-01

    Background Here we review the safety and tolerability profile of lisdexamfetamine dimesylate (LDX), the first long-acting prodrug stimulant for the treatment of attention-deficit/hyperactivity disorder (ADHD). Methods A PubMed search was conducted for English-language articles published up to 16 September 2013 using the following search terms: (lisdexamfetamine OR lisdexamphetamine OR SPD489 OR Vyvanse OR Venvanse OR NRP104 NOT review [publication type]). Results In short-term, parallel-group...

  14. Similarity of PSR J1906+0746 to PSR J0737–3039: a Candidate of a New Double Pulsar System?

    Yang, Yi-Yan; Lingfu, Rong-Feng; Zhou, Zhu-Wen [School of Physics and Electronic Sciences, Guizhou Education University, Guiyang 550018 (China); Zhang, Cheng-Min; Li, Di [National Astronomical Observatories, Chinese Academy of Sciences, Beijing 100012 (China); Wang, De-Hua [School of Physics and Electronic Sciences, Guizhou Normal University, Guiyang 550001 (China); Pan, Yuan-Yue, E-mail: yangyiyan@gznc.edu.cn, E-mail: zhangcm@bao.ac.cn [Department of Physics, Xiangtan University, Xiangtan, 411105 (China)

    2017-02-01

    PSR J1906+0746 is a nonrecycled strong magnetic field neutron star (NS), sharing the properties of the secondary-formed NS PSR J0737–3039B in the double pulsar system PSR J0737–3039AB. By comparing the orbital parameters of PSR J1906+0746 with those of PSR J0737–3039AB, we conclude that both systems have a similar origin and evolution history, involving an e-capture process for forming the second-born NS, like in the case of PSR J0737–3039B. We expect the companion of PSR J1906+0746 to be a long-lived recycled pulsar with radio beams that currently cannot be observed from Earth. We suggest possible ways to detect its presence. To compare PSR J1906+0746 with PSR J0737–3039, we also present the mass distribution of eight pairs of double NSs and find that in double NSs the mass of the recycled pulsar is usually larger than that of the nonrecycled one, which may be the result of accretion.

  15. Standard Review Plan for the review of safety analysis reports for nuclear power plants: LWR edition

    1987-06-01

    The Standard Review Plan (SRP) is prepared for the guidance of staff reviewers in the Office of Nuclear Reactor Regulation in performing safety reviews of applications to construct or operate nuclear power plants. The principal purpose of the SRP is to assure the quality and uniformity of staff reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. It is also a purpose of the SRP to make information about regulatory matters widely available and to improve communication and understanding of the staff review process by interested members of the public and the nuclear power industry. The safety review is primarily based on the information provided by an applicant in a Safety Analysis Report (SAR). The SAR must be sufficiently detailed to permit the staff to determine whether the plant can be built and operated without undue risk to the health and safety of the public. The SAR is the principal document in which the applicant provides the information needed to understand the basis upon which this conclusion has been reached. The individual SRP sections address, in detail, who performs the review, the matters that are reviewed, the basis for review, how the review is accomplished, and the conclusions that are sought. The safety review is performed by 25 primary branches. One of the objectives of the SRP is to assign the review responsibilities to the various branches and to define the sometimes complex interfaces between them. Each SRP section identifies the branch that has the primary review responsibility for that section. In some review areas the primary branch may require support, and the branches that are assigned these secondary review responsibilities are also identified for each SRP section

  16. The work of the Operational Safety Review Team (OSART)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  17. Nuclear Fuel Safety Criteria Technical Review - Second edition

    Beck, Winfried; Blanpain, Patrick; Fuketa, Toyoshi; Gorzel, Andreas; Hozer, Zoltan; Kamimura, Katsuichiro; Koo, Yang-Hyun; Maertens, Dietmar; Nechaeva, Olga; Petit, Marc; Rehacek, Radomir; Rey-Gayo, Jose Maria; Sairanen, Risto; Sonnenburg, Heinz-Guenther; Valach, Mojmir; Waeckel, Nicolas; Yueh, Ken; Zhang, Jinzhao; Voglewede, John

    2012-01-01

    Most of the current nuclear fuel safety criteria were established during the 1960's and early 1970's. Although these criteria were validated against experiments with fuel designs available at that time, a number of tests were based on unirradiated fuels. Additional verification was performed as these designs evolved, but mostly with the aim of showing that the new designs adequately complied with existing criteria, and not to establish new limits. In 1996, the OECD Nuclear Energy Agency (NEA) reviewed existing fuel safety criteria, focusing on new fuel and core designs, new cladding materials and industry manufacturing processes. The results were published in the Nuclear Fuel Safety Criteria Technical Review of 2001. The NEA has since re-examined the criteria. A brief description of each criterion and its rationale are presented in this second edition, which will be of interest to both regulators and industry (fuel vendors, utilities)

  18. Immunization Safety Review: Thimerosal - Containing Vaccines and Neurodevelopmental Disorders

    Stratton, Kathleen; Gable, Alicia; McCormick, Marie C

    2001-01-01

    ..., and Marie C.McCormick, Editors Immunization Safety Review Committee Board on Health Promotion and Disease Prevention INSTITUTE OF MEDICINE NATIONAL ACADEMY PRESS Washington, D.C. Copyrightoriginal retained, the be not from cannot book, paper original however, for version formatting, authoritative the typesetting-specific created from the as publ...

  19. Proton storage ring (PSR) diagnostics and control system

    Clout, P.

    1983-01-01

    When any new accelerator or storage ring is built that advances the state of the art, the diagnostic system becomes extremely important in tuning the facility to full specification. This paper will discuss the various diagnostic devices planned or under construction for the PSR and their connection into the control system

  20. On the age of PSR B 1509-58

    Gvaramadze, V. V.

    2001-07-01

    It is generally accepted that the PSR B 1509-58 is associated with the supernova remnant (SNR) MSH 15-52 (G 320.4-01.2). The spin-down age of the pulsar is =~ 1700 years, while the size and the general appearance of the SNR suggest that this system is much older. A few possible explanations of this discrepancy have been put forward. We offer an alternative one and suggest that the high spin-down rate of the pulsar characterizes only a relatively short period of its (present) spin history, and that the enhanced braking torque is connected with the interaction between the pulsar's magnetosphere and the dense matter of a circumstellar clump (created during the late evolutionary stages of the supernova (SN) progenitor star). Our suggestion implies that the ``true" age of PSR B 1509-58 could be much larger than the spin-down age, and therefore the SNR MSH 15-52 is a middle-aged remnant similar to the Vela SNR (G 263.9-3.3). We also suggest that the dense (neutral) gas of the circumstellar clump could be responsible for the enhanced neutral hydrogen absorption towards PSR B 1509-58, and that the optical emission of an optical counterpart for PSR B 1509-58 should rather be attributed to a bow shock around this pulsar than to the pulsar itself.

  1. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review.

    Louise H Hall

    Full Text Available To determine whether there is an association between healthcare professionals' wellbeing and burnout, with patient safety.Systematic research review.PsychInfo (1806 to July 2015, Medline (1946 to July 2015, Embase (1947 to July 2015 and Scopus (1823 to July 2015 were searched, along with reference lists of eligible articles.Quantitative, empirical studies that included i either a measure of wellbeing or burnout, and ii patient safety, in healthcare staff populations.Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all subscales of the burnout measures employed, and patient safety.Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed.This review illustrates the need for healthcare organisations to consider improving employees' mental health as well as creating safer work environments when planning interventions to improve patient safety.PROSPERO registration number: CRD42015023340.

  2. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review.

    Hall, Louise H; Johnson, Judith; Watt, Ian; Tsipa, Anastasia; O'Connor, Daryl B

    2016-01-01

    To determine whether there is an association between healthcare professionals' wellbeing and burnout, with patient safety. Systematic research review. PsychInfo (1806 to July 2015), Medline (1946 to July 2015), Embase (1947 to July 2015) and Scopus (1823 to July 2015) were searched, along with reference lists of eligible articles. Quantitative, empirical studies that included i) either a measure of wellbeing or burnout, and ii) patient safety, in healthcare staff populations. Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all) subscales of the burnout measures employed, and patient safety. Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed. This review illustrates the need for healthcare organisations to consider improving employees' mental health as well as creating safer work environments when planning interventions to improve patient safety. PROSPERO registration number: CRD42015023340.

  3. Economic evaluation in patient safety: a literature review of methods.

    de Rezende, Bruna Alves; Or, Zeynep; Com-Ruelle, Laure; Michel, Philippe

    2012-06-01

    Patient safety practices, targeting organisational changes for improving patient safety, are implemented worldwide but their costs are rarely evaluated. This paper provides a review of the methods used in economic evaluation of such practices. International medical and economics databases were searched for peer-reviewed publications on economic evaluations of patient safety between 2000 and 2010 in English and French. This was complemented by a manual search of the reference lists of relevant papers. Grey literature was excluded. Studies were described using a standardised template and assessed independently by two researchers according to six quality criteria. 33 articles were reviewed that were representative of different patient safety domains, data types and evaluation methods. 18 estimated the economic burden of adverse events, 3 measured the costs of patient safety practices and 12 provided complete economic evaluations. Healthcare-associated infections were the most common subject of evaluation, followed by medication-related errors and all types of adverse events. Of these, 10 were selected that had adequately fulfilled one or several key quality criteria for illustration. This review shows that full cost-benefit/utility evaluations are rarely completed as they are resource intensive and often require unavailable data; some overcome these difficulties by performing stochastic modelling and by using secondary sources. Low methodological transparency can be a problem for building evidence from available economic evaluations. Investing in the economic design and reporting of studies with more emphasis on defining study perspectives, data collection and methodological choices could be helpful for strengthening our knowledge base on practices for improving patient safety.

  4. Review of Safety and Security of Radioactive Sources in Africa

    Kiti, Shadrack Anthony; Choi, Kwang Sik

    2011-01-01

    Radioactive materials are used worldwide for peaceful applications in medicine, industry, agriculture, environmental science, education and research and military applications. Most of these radioactive sources used are imported therefore trans-boundary movement is a significant factor in consideration of safety and security measures during movement of these sources. It is estimated that 20 million packages of radioactive materials are transported annually worldwide and this number of shipments is expected to increase due to the renaissance of nuclear power generation. The African continent has shown considerable leadership in its advocacy for the safety and security of radioactive sources. The First Africa Workshop on the Establishment of a Legal Framework governing Radiation Protection, the Safety of Radiation Sources and the Safe Management of Radioactive Waste held in Ethiopia in 2001 called upon the IAEA to form a forum for African countries to consider the Code of Conduct on the Safety and Security of Radioactive Sources and give it a legally binding effect so that the peaceful use of nuclear technology is not compromised. Despite these laudable efforts, Africa still faces considerable challenges in the implementation of safety and security of radioactive sources because of weak regulatory control and lack of infrastructure to properly control, manage and secure radiation sources 1 . The purpose of this paper was therefore, to analyze, review, address and share knowledge and experience with regard to safety and security measures of radioactive materials in Africa. This project will benefit IAEA's African member states in creating nuclear safety and security networking in the region

  5. [Patient safety in home care - A review of international recommendations].

    Czakert, Judith; Lehmann, Yvonne; Ewers, Michael

    2018-06-08

    In recent years there has been a growing trend towards nursing care at home in general as well as towards intensive home care being provided by specialized home care services in Germany. However, resulting challenges for patient safety have rarely been considered. Against this background we aimed to explore whether international recommendations for patient safety in home care in general and in intensive home care in particular already exist and how they can stimulate further practice development in Germany. A review of online English documents containing recommendations for patient safety in intensive home care was conducted. Available documents were analyzed and compared in terms of their form and content. Overall, a small number of relevant documents could be identified. None of these documents exclusively refer to the intensive home care sector. Despite their differences, however, the analysis of four selected documents showed similarities, e. g., regarding specific topics of patient safety (communication, involvement of patients and their relatives, risk assessment, medication management, qualification). Furthermore, strengths and weaknesses of the documents became apparent: e. g., an explicit understanding of patient safety, a literature-based introduction to safety topics or an adaptation of the recommendations to the specific features of home care were occasionally lacking. This document analysis provides interesting input to the formal and content-related development of specific recommendations and to practice development in Germany to improve patient safety in home care. Copyright © 2018. Published by Elsevier GmbH.

  6. Review of current status of LWR safety research in Japan

    Yamada, Tasaburo; Mishima, Yoshitsugu; Ando, Yoshio; Miyazono, Shohachiro; Takashima, Yoichi.

    1977-01-01

    The Japan Atomic Energy Commission has exerted efforts on the research of the safety of nuclear plants in Japan, and ''Nuclear plant safety research committees'' was established in August 1974, which is composed of the government and the people. The philosophy of safety research, research and development plan, the forwarding procedure of the plan, international cooperation, for example LOFT program, and the effective feed back of the experimental results concerning nuclear safety are reviewed in this paper at first. As for the safety of nuclear reactors the basic philosophy that radio active fission products are contained in fuel or reactors with multiple barriers, (defence in depth) and almost no fission product is released outside reactor plants even at the time of hypothetical accident, is kept, and the research and development history and the future plan are described in this paper with the related technical problems. The structural safety is also explained, for example, on the philosophy ''leak before break'', pipe rupture, pipe restraint and stress analysis. The release of radioactive gas and liquid is decreased as the philosophy ''ALAP''. And probability safety evaluation method, LOCA, reactivity, accident and aseismatic design in nuclear plants in Japan are described. (Nakai, Y.)

  7. The value of peer reviews to nuclear plant safety

    Subalusky, W.T. Jr.

    1994-01-01

    On a global basis, the nuclear utility industry has clearly demonstrated the value of peer reviews for improving nuclear safety and overall plant performance. Peer reviews are conducted by small teams of technical experts who review various aspects of plant operation, recognize strengths and recommend improvements, thereby stimulating a positive response to the recommendations. U.S. nuclear utilities initiated the operator-to-operator peer review process first through the Institute of Nuclear Power Operations (INPO). Now, voluntary peer reviews are an important activity of the World Association of Nuclear Operators (WANO). Formed just five years ago. WANO has made significant progress in its key activities of the operator-to-operator exchanges, operating experience exchange, monitoring of plant performance indicators and sharing of good practices worldwide. A fifth activity, peer review on a strictly voluntary basis, is pertinent to this paper

  8. IAEA Review for Gap Analysis of Safety Analysis Capability

    Basic, Ivica; Kim, Manwoong; Huges, Peter; Lim, B-K; D'Auria, Francesco; Louis, Vidard Michael

    2014-01-01

    improvement of nuclear safety in the participating host organization and host member countries. To achieve this goal, the EM is to establish a process of discussion and comparison of gap findings, which will lead to sharing of information, experience, strengths and weaknesses among the participants, and foster regional cooperation to improve the weaknesses and improve safety generally. The pilot mission was conducted from 28 October to 1 November for one week at the National Nuclear Agency (BATAN) in Indonesia by the mission team formulated with 6 international experts who have considerable knowledge and experience in the field of safety analysis such as the deterministic safety analysis (DSA) and probabilistic safety analysis (PSA). Some comments and recommendations were given to BATAN management to support the establishment and maintenance of safety analysis capability and human resource, organizational and training aspects. Those aspects are important as a measure of the progress being made and an indicator of areas in SATG within the framework of the Extra-budgetary Programme on the Safety of Nuclear Installations in Southeast Asia, the Pacific, and Far East Countries (the EBP-Asia) or other cooperation programme, such as the IAEA Technical Cooperation programme. Provided in 2013 the Review of Gap Analysis for BATAN (Indonesian Nuclear Safety Regulatory Body) could be good reference for all other newcomer countries which started or plans nuclear power plant installation. (authors)

  9. Independent peer review of nuclear safety computer codes

    Boyack, B.E.; Jenks, R.P.

    1993-01-01

    A structured, independent computer code peer-review process has been developed to assist the US Nuclear Regulatory Commission (NRC) and the US Department of Energy in their nuclear safety missions. This paper describes a structured process of independent code peer review, benefits associated with a code-independent peer review, as well as the authors' recent peer-review experience. The NRC adheres to the principle that safety of plant design, construction, and operation are the responsibility of the licensee. Nevertheless, NRC staff must have the ability to independently assess plant designs and safety analyses submitted by license applicants. According to Ref. 1, open-quotes this requires that a sound understanding be obtained of the important physical phenomena that may occur during transients in operating power plants.close quotes The NRC concluded that computer codes are the principal products to open-quotes understand and predict plant response to deviations from normal operating conditionsclose quotes and has developed several codes for that purpose. However, codes cannot be used blindly; they must be assessed and found adequate for the purposes they are intended. A key part of the qualification process can be accomplished through code peer reviews; this approach has been adopted by the NRC

  10. Optical counterparts of two Fermi millisecond pulsars: PSR J1301+0833 and PSR J1628–3205

    Li, Miao; Halpern, Jules P.; Thorstensen, John R.

    2014-01-01

    Using the 1.3 m and 2.4 m Telescopes of the MDM Observatory, we identified the close companions of two eclipsing millisecond radio pulsars that were discovered by the Green Bank Telescope in searches of Fermi Gamma-ray Space Telescope sources, and measured their light curves. PSR J1301+0833 is a black widow pulsar in a 6.5 hr orbit whose companion star is strongly heated on the side facing the pulsar. It varies from R = 21.8 to R > 24 around the orbit. PSR J1628–3205 is a 'redback', a nearly Roche-lobe-filling system in a 5.0 hr orbit whose optical modulation in the range 19.0 < R < 19.4 is dominated by strong ellipsoidal variations, indicating a large orbital inclination angle. PSR J1628–3205 also shows evidence for a long-term variation of about 0.2 mag, and an asymmetric temperature distribution possibly due to either off-center heating by the pulsar wind, or large starspots. Modeling of its light curve restricts the inclination angle to i > 55°, the mass of the companion to 0.16 < M c < 0.30 M ☉ , and the effective temperature to 3560 < T eff < 4670 K. As is the case for several redbacks, the companion of PSR J1628–3205 is less dense and hotter than a main-sequence star of the same mass.

  11. Fuel safety criteria and review by OECD / CSNI task force

    Van Doesburg, W.

    1999-01-01

    Full text of publication follows: with the advent of advanced fuel and core designs, and the implementation of more accurate (best estimate or statistical) design and analysis methods, there is a general feeling that safety margins have been or are being reduced. Historically, fuel safety margins were defined by adding conservatism to the safety limits, which in turn were also fixed in a conservative manner, here, the expression 'conservatism' expresses the fact that bounding or limiting numbers were chosen for model parameters, plant and fuel design data, and fuel operating history values. Unfortunately, as these conservatisms were not quantified (or quantifiable), the amount of safety available or the reduction thereof is difficult to substantiate. For the regulator, it is important to know the margin available with the utilities' request for approval of new fuel or methods; likewise, for the utility and vendor it is important to know what margins exist and what they are based on, to identify in which direction they can make further progress and optimize fuel and fuel cycle cost. Naturally, each party involved will have to decide on how much margin should be in place, to establish operational criteria and ensure that these can actually be met during operation. To assess the margins issue, safety criteria themselves need to be reviewed first. Most - if not all - of the currently existing safety criteria were established during the 60's and early 70's, and verified against experiments with fuel available at that time - mostly at zero exposure. Of course, verification was performed as designs progressed in later years, primarily with the aim to be able to prove that safety criteria were adequate as long as the said conservatisms would be retained, and not with the aim to reestablish limits. The mandate to the OECD/CSNI/PWG2 Task Force on Fuel Safety Criteria (TFFSC) is to assess the adequacy of existing fuel safety criteria, in view of the 'new design' elements (new

  12. Review of probabilistic safety assessments by regulatory bodies

    2002-01-01

    This report provides guidance to assist regulatory bodies in carrying out reviews of the PSAs produced by utilities. In following this guidance, it is important that the regulatory body is able to satisfy itself that the PSA has been carried out to an acceptable standard and that it can be used for its intended applications. The review process becomes an important phase in determining the acceptability of the PSA since this provides a degree of assurance of the PSA scope, validity and limitations, as well as a better understanding of plants themselves. This report is also intended to assist technical experts managing or performing PSA reviews. A particular aim is to promote a standardized framework, terminology and form of documentation for the results of PSA reviews. The information presented in this report supports IAEA Safety Guide No. GS-G-1.2. Recommendations on the scope and methods to be used by the utility in the preparation of a PSA study is provided in IAEA Safety Guide No. NSG- 1.2. Information on these Safety Guides and other IAEA safety standards for nuclear power plants can be found on the following Internet site: http://www.iaea.org/ns/coordinet. The scope of this report covers the review of Level 1, 2 and 3 PSAs for event sequences occurring in all modes of plant operation (including full power, low power and shutdown). Where the scope of the analysis is narrower than this, a subset of the guidance can be identified and used. Information is provided on carrying out the review of a PSA throughout the PSA production process, i.e. from the initial decision to carry out the PSA through to the completion of the study and the production of the final PSA report. However, the same procedure can be applied to a completed PSA or to one already in progress. As a result of the performance of a PSA, changes to the design or operation of the plant are often identified that would increase the level of safety. This might include the addition of further safety

  13. Grasping at Straws: Comments on the Alberta Pipeline Safety Review

    Jennifer Winter

    2013-09-01

    Full Text Available The release last month of the Alberta Pipeline Safety Review was meant to be a symbol of the province’s renewed commitment to environmental responsibility as it aims for new export markets. The report’s authors, Group 10 Engineering, submitted 17 recommendations covering public safety and pipeline incidents, pipeline integrity management and pipeline safety near bodies of water — and many of them run the gamut from the obvious to the unhelpful to the contradictory. That the energy regulator ought to be staffed to do its job should go without saying; in fact, staffing levels were never identified as an issue. The recommendation that record retention and transfer requirements be defined for mergers and acquisitions, sales and takeovers is moot. There is no reason a purchasing party would not want all relevant documents, and no real way to enforce transparency if the seller opts to withhold information. Harmonizing regulations between provinces could reduce companies’ cost of doing business, but could also prove challenging if different jurisdictions use performance-based regulations — which is what the Review recommended Alberta consider. This very brief paper pries apart the Review’s flaws and recommends that the province go back to the drawing board. Safety is a serious issue; a genuine statistical review linking pipeline characteristics to failures and risk-mitigation activities would be a better alternative by far.

  14. Review of Radiation Safety in Medical X-Ray Diagnosis

    Koteng, O.A.

    2015-01-01

    Medical X-Ray machines have been used for more than a century for non-invasive diagnosis of patients for the benefit of mankind. The safety of operators and patients during such practice has improved with time, but, still cases of detrimental effects to Radiation Workers in Kenya including cancer related deaths have been reported in the recent past. An ongoing study is reviewing the safety status of the worker and patients during medical and dental exposures. The study was initiated following complaint of recurrent headaches by a radiographer working in a busy Kenyan hospital. (author)

  15. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  16. IAEA Concludes Safety Review at Gravelines Nuclear Power Plant, France

    2012-01-01

    Full text: An IAEA-led international team of nuclear safety experts noted a series of good practices and made recommendations to reinforce some safety measures during a review of operational safety at France's Gravelines Nuclear Power Plant (NPP) that concluded today. The Operational Safety Review Team (OSART) was assembled at the French Government's request. The in-depth review, which began 12 November 2012, focused on aspects essential to the safe operation of the NPP. The team was composed of experts from Bulgaria, China, Germany, Hungary, Japan, Romania, Slovakia, South Africa, Spain, Ukraine and the IAEA. The review covered the areas of management, organization and administration; training and qualification; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency planning and preparedness; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their possible use elsewhere. Examples include the following: - The Power Plant uses a staff-skills mapping process that significantly enhances knowledge of the facility's collective and individual skills and provides proactive management to address the loss of such skills; - As a measure to reduce the risk of workers' radiation exposure, the Power Plant uses a system to ensure that dose rate measurements are carried out at a precise distance from the source of radiation; and - Flood protection of the Power Plant is supported by special technical guidance documents and associated arrangements. The team identified a number of proposals for improvements to operational safety at Gravelines NPP. Examples include the following: - The Power Plant should reinforce its measures to prevent foreign objects from entering plant systems; - The Power Plant should ensure the 24-hour presence of an operator

  17. Effect of electronic device use on pedestrian safety : a literature review.

    2016-04-01

    This literature review on the effect of electronic device use on pedestrian safety is part of a research project sponsored by the Office of Behavioral Safety Research in the National Highway Traffic Safety Administration (NHTSA). An extensive literat...

  18. Periodic safety review of the experimental fast reactor JOYO. Review of aging management

    Isozaki, Kazunori; Ogawa, To-ru; Nishino, Kazunari

    2005-05-01

    Periodic safety review (Review of the aging management) which consisted of ''Technical review on aging for the safety related structures, systems and components'' and ''Establishment a long term maintenance program'' was carried out up to April 2005. 1. Technical review on aging for the safety related structures, systems and components. It was technically confirmed to prevent the loss of function of the safety related structures, systems and components due to aging phenomena, which (1) irradiation damage, (2) corrosion, (3) abrasion and erosion, (4) thermal aging, (5) creep and fatigue, (6) Stress Corrosion Cracking, (7) insulation deterioration and (8) general deterioration, under the periodic monitoring or renewal of them. 2. Establishment of long term maintenance program. The long term maintenance during JFY2005 to 2014 were established based on the technical review on aging for the safety related structures, systems and components. It was evaluated that the inspection and renewal based on the long term maintenance program, in addition to the spontaneous inspection of the long term voluntary long-term inspection plan, could prevent the loss of function of the safety related structures, systems and components. (author)

  19. ENHANCING FOOD SAFETY AND STABILITY THROUGH IRRADIATION: A REVIEW

    Manzoor Ahmad Shah

    2014-04-01

    Full Text Available Food irradiation is one of the non thermal food processing methods. It is the process of exposing food materials to the controlled amounts of ionizing radiations such as gamma rays, X-rays and accelerated electrons, to improve microbiological safety and stability. Irradiation disrupts the biological processes that lead to decay of food quality. It is an effective tool to reduce food-borne pathogens, spoilage microorganisms and parasites; to extend shelf-life and for insect disinfection. The safety and consumption of irradiated foods have been extensively studied at national levels and in international cooperations and have concluded that foods irradiated under appropriate technologies are both safe and nutritionally adequate. Specific applications of food irradiation have been approved by national legislations of more than 55 countries worldwide. This review aims to discuss the applications of irradiation in food processing with the emphasis on food safety and stability.

  20. Patient Safety Learning Systems: A Systematic Review and Qualitative Synthesis.

    2017-01-01

    A patient safety learning system (sometimes called a critical incident reporting system) refers to structured reporting, collation, and analysis of critical incidents. To inform a provincial working group's recommendations for an Ontario Patient Safety Event Learning System, a systematic review was undertaken to determine design features that would optimize its adoption into the health care system and would inform implementation strategies. The objective of this review was to address two research questions: (a) what are the barriers to and facilitators of successful adoption of a patient safety learning system reported by health professionals and (b) what design components maximize successful adoption and implementation? To answer the first question, we used a published systematic review. To answer the second question, we used scoping study methodology. Common barriers reported in the literature by health care professionals included fear of blame, legal penalties, the perception that incident reporting does not improve patient safety, lack of organizational support, inadequate feedback, lack of knowledge about incident reporting systems, and lack of understanding about what constitutes an error. Common facilitators included a non-accusatory environment, the perception that incident reporting improves safety, clarification of the route of reporting and of how the system uses reports, enhanced feedback, role models (such as managers) using and promoting reporting, legislated protection of those who report, ability to report anonymously, education and training opportunities, and clear guidelines on what to report. Components of a patient safety learning system that increased successful adoption and implementation were emphasis on a blame-free culture that encourages reporting and learning, clear guidelines on how and what to report, making sure the system is user-friendly, organizational development support for data analysis to generate meaningful learning outcomes

  1. Monitoring and reviewing research reactor safety in Australia

    Cairns, R.C.; Greenslade, G.K.

    1990-01-01

    Th research reactors operated by the Australian Nuclear Science and Technology Organization (ANSTO) comprise the 10 MW reactor HIFAR and the 100 kW reactor Moata. Although there are no power reactors in Australia the problems and issues of public concern which arise in the operation of research reactors are similar to those of power reactors although on a smaller scale. The need for independent safety surveillance has been recognized by the Australian Government and the ANSTO Act, 1987, required the Board of ANSTO to establish a Nuclear Safety Bureau (NSB) with responsibility to the Minister for monitoring and reviewing the safety of nuclear plant operated by ANSTO. The Executive Director of ANSTO operates HIFAR subject to compliance with requirements and arrangements contained in a formal Authorization from the Board of ANSTO. A Ministerial Direction to the Board of ANSTO requires the NSB to report to him, on a quarterly basis, matters relating to its functions of monitoring and reviewing the safety of ANSTO's nuclear plant. Experience has shown that the Authorization provides a suitable framework for the operational requirements and arrangements to be organised in a disciplined and effective manner, and also provides a basis for audits by the NSB by which compliance with the Board's safety requirements are monitored. Examples of the way in which the NSB undertakes its monitoring and reviewing role are given. Moata, which has a much lower operating power level and fission product inventory than HIFAR, has not been subject to a formal Authorization to date but one is under preparation

  2. Russian MINATOM nuclear safety research strategic plan. An international review

    1999-03-01

    The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)

  3. A Review of Research on Driving Styles and Road Safety.

    Sagberg, Fridulv; Selpi; Piccinini, Giulio Francesco Bianchi; Engström, Johan

    2015-11-01

    The aim of this study was to outline a conceptual framework for understanding driving style and, on this basis, review the state-of-the-art research on driving styles in relation to road safety. Previous research has indicated a relationship between the driving styles adopted by drivers and their crash involvement. However, a comprehensive literature review of driving style research is lacking. A systematic literature search was conducted, including empirical, theoretical, and methodological research, on driving styles related to road safety. A conceptual framework was proposed whereby driving styles are viewed in terms of driving habits established as a result of individual dispositions as well as social norms and cultural values. Moreover, a general scheme for categorizing and operationalizing driving styles was suggested. On this basis, existing literature on driving styles and indicators was reviewed. Links between driving styles and road safety were identified and individual and sociocultural factors influencing driving style were reviewed. Existing studies have addressed a wide variety of driving styles, and there is an acute need for a unifying conceptual framework in order to synthesize these results and make useful generalizations. There is a considerable potential for increasing road safety by means of behavior modification. Naturalistic driving observations represent particularly promising approaches to future research on driving styles. Knowledge about driving styles can be applied in programs for modifying driver behavior and in the context of usage-based insurance. It may also be used as a means for driver identification and for the development of driver assistance systems. © 2015, Human Factors and Ergonomics Society.

  4. Management implementation plan for a safety analysis and review system

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  5. SRTC criticality safety technical review of SRT-CMA-930039

    Rathbun, R.

    1993-01-01

    Review of SRT-CMA-930039, ''Nuclear Criticality Safety Evaluation (NCSE): DWPF Melter-Batch 1,'' December 1, 1993, has been performed by the Savannah River Technical Center (SRTC) Applied Physics Group. The NCSE is a criticality assessment of the Melt Cell in the DWPF. Additionally, this pertains only to Batch 1 operation, which differs from batches to follow. Plans for subsequent batch operations call for fissile material in the Salt Cell feed-stream, which necessitates a separate criticality evaluation in the future. The NCSE under review concludes that the process is safe from criticality events, even in the event that all lithium and boron neutron poisons are lost, provided uranium enrichments are less than 40%. Furthermore, if all the lithium and as much as 98% of the boron would be lost, uranium enrichments of 100% would be allowable. After a thorough review of the NCSE, this reviewer agrees with that conclusion. This technical review consisted of: an independent check of the methods and models employed, independent calculations application of ANSI/ANS 8.1, verification of WSRC Nuclear Criticality Safety Manual( 2 ) procedures

  6. Interagency Nuclear Safety Review Panel Power System Subpanel review for the Ulysses mission

    McCulloch, W.H.

    1991-01-01

    As part of the Interagency Nuclear Safety Review Panel's assessment of the nuclear safety of NASA's Ulysses Mission to investigate properties of the sun, the Power System Subpanel has reviewed the safety analyses and risk evaluations done for the General Purpose Heat Source-Radioisotope Thermoelectric Generator which provides on-board electrical power for the spacecraft. This paper summarizes the activities and results of that review. In general, the approach taken in the primary analysis, executed by the General Electric Company under contract to the Department of Energy, and the resulting conclusions were confirmed by the review. However, the Subpanel took some exceptions and modified the calculations accordingly, producing an independent evaluation of potential releases of radioactive fuel in launch and reentry accidents. Some of the more important of these exceptions are described briefly

  7. A Review of General Aviation Safety (1984-2017).

    Boyd, Douglas D

    2017-07-01

    General aviation includes all civilian aviation apart from operations involving paid passenger transport. Unfortunately, this category of aviation holds a lackluster safety record, accounting for 94% of civil aviation fatalities. In 2014, of 1143 general aviation accidents, 20% were fatal compared with 0 of 29 airline mishaps in the United States. Herein, research findings over the past 30 yr will be reviewed. Accident risk factors (e.g., adverse weather, geographical region, post-impact fire, gender differences) will be discussed. The review will also summarize the development and implementation of stringent crashworthiness designs with multi-axis dynamic testing and head-injury protection and its impact on mitigating occupant injury severity. The benefits and drawbacks of new technology and human factor considerations associated with increased general aviation automation will be debated. Data on the safety of the aging general aviation population and increased drug usage will also be described. Finally, areas in which general aviation occupant survival could be improved and injury severity mitigated will be discussed with the view of equipping aircraft with 1) crash-resistant fuel tanks to reduce post-impact conflagration; 2) after-market ballistic parachutes for older aircraft; and 3) current generation electronic locator beacons to hasten site access by first responders.Boyd DD. A review of general aviation safety (1984-2017). Aerosp Med Hum Perform. 2017; 88(7):657-664.

  8. Standard review plan for reviewing safety analysis reports for dry metallic spent fuel storage casks

    1988-01-01

    The Cask Standard Review Plan (CSRP) has been prepared as guidance to be used in the review of Cask Safety Analysis Reports (CSARs) for storage packages. The principal purpose of the CSRP is to assure the quality and uniformity of storage cask reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The CSRP also sets forth solutions and approaches determined to be acceptable in the past by the NRC staff in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a CSAR does not have to follow the solutions or approaches presented in the CSRP. However, applicants should recognize that the NRC staff has spent substantial time and effort in reviewing and developing their positions for the issues. A corresponding amount of time and effort will probably be required to review and accept new or different solutions and approaches

  9. PSR experience with beam losses, instabilities and space charge effects

    Macek, R.J.

    1998-01-01

    Average current from the PSR has been limited to ∼70 μA at 20 Hz by beam losses of 0.4 to 0.5 μA which arise from two principal causes, production of H 0 excited states and stored-beam scattering in the stripper foil. To reduce beam losses, an upgrade from the two-step H 0 injection to direct H - injection is underway and will be completed in 1998. Peak intensity from the PSR is limited by a strong instability that available evidence indicates is the two-stream e-p instability. New evidence for the e-p hypothesis is presented. At operating intensities, the incoherent space charge tune shift depresses both horizontal and vertical tunes past the integer without additional beam loss although some intensity-dependent emittance growth is observed. copyright 1998 American Institute of Physics

  10. PSR experience with beam losses, instabilities and space charge effects

    Macek, Robert J.

    1998-01-01

    Average current from the PSR has been limited to ∼70 μA at 20 Hz by beam losses of 0.4 to 0.5 μA which arise from two principal causes, production of H 0 excited states and stored-beam scattering in the stripper foil. To reduce beam losses, an upgrade from the two-step H 0 injection to direct H - injection is underway and will be completed in 1998. Peak intensity from the PSR is limited by a strong instability that available evidence indicates is the two-stream e-p instability. New evidence for the e-p hypothesis is presented. At operating intensities, the incoherent space charge tune shift depresses both horizontal and vertical tunes past the integer without additional beam loss although some intensity-dependent emittance growth is observed

  11. SKI - ASAR - O3. As operated Safety Analysis Report. Recurring safety review 1996 Oskarshamn 3

    1997-12-01

    According to Swedish law, the reactor owner is responsible for performing a safety review and writing a ''ASAR''-report. The Nuclear Power Inspectorate (SKI) examines this report, and reports the findings to the government (the ''SKI-ASAR'' report). Each Swedish reactor should pass through three full ASAR reviews during its life-time, similar to the licensing inspection before start-up of the reactor. The first series ASAR was delivered by OKG to SKI in December 1996, and forms the basis for the SKI analysis in the present report

  12. SKI - ASAR - F3. As operated Safety Analysis Report. Recurring safety review 1996 Forsmark 3

    1997-12-01

    According to Swedish law, the reactor owner is responsible for performing a safety review and writing a ''ASAR''-report. The Nuclear Power Inspectorate (SKI) examines this report, and reports the findings to the government (the ''SKI-ASAR'' report). Each Swedish reactor should pass through three full ASAR reviews during its life-time, similar to the licensing inspection before start-up of the reactor. The first series ASAR was delivered by FKA to SKI in December 1996, and forms the basis for the SKI analysis in the present report

  13. SKI - ASAR - R1. As operated Safety Analysis Report. Recurring safety review 1995 Ringhals 1

    2000-01-01

    According to Swedish law, the reactor owner is responsible for performing a safety review and writing a so called ASAR-report. The Nuclear Power Inspectorate (SKI) examines this report, and reports the findings to the government (the so called SKI-ASAR-report). Each Swedish reactor should pass through three full ASAR reviews during its lifetime, similar to the licensing inspection before start-up of the reactor. The second series ASAR was delivered by the Ringhals utility to SKI in September 1995, and forms the basis for the SKI analysis in the present report

  14. 78 FR 25476 - Meeting of the Public Safety Officer Medal of Valor Review Board

    2013-05-01

    ... Safety Officer Medal of Valor Review Board AGENCY: Bureau of Justice Assistance (BJA), Department of...) of the Public Safety Officer Medal of Valor Review Board to consider a range of issues of [email protected] . SUPPLEMENTARY INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out...

  15. 77 FR 26790 - Meeting of the Public Safety Officer Medal of Valor Review Board

    2012-05-07

    ... Safety Officer Medal of Valor Review Board AGENCY: Office of Justice Programs (OJP), Bureau of Justice... meeting (via conference call-in) of the Public Safety Officer Medal of Valor Review Board (``Board'') to... INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out those advisory functions...

  16. 49 CFR 209.501 - Review of rail transportation safety and security route analysis.

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Review of rail transportation safety and security....820 § 209.501 Review of rail transportation safety and security route analysis. (a) Review of route... establish that the route chosen by the carrier poses the least overall safety and security risk, the...

  17. 49 CFR 659.29 - Oversight agency safety and security reviews.

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Oversight agency safety and security reviews. 659... Role of the State Oversight Agency § 659.29 Oversight agency safety and security reviews. At least... safety program plan and system security plan. Alternatively, the on-site review may be conducted in an on...

  18. 29 CFR 2200.108 - Official Seal of the Occupational Safety and Health Review Commission.

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Official Seal of the Occupational Safety and Health Review... Occupational Safety and Health Review Commission. The seal of the Commission shall consist of: A gold eagle... background, encircled by a white band edged in black and inscribed “Occupational Safety and Health Review...

  19. Regulatory review of probabilistic safety assessment (PSA) Level 2

    2001-07-01

    Probabilistic safety assessment (PSA) is increasingly being used as part of the decision making process to assess the level of safety of nuclear power plants. The methodologies in use are maturing and the insights gained from the PSAs are being used along with those from deterministic analysis. Many regulatory authorities consider the current state of the art in PSA to be sufficiently well developed for results to be used centrally in the regulatory decision making process-referred to as risk informed regulation. For these applications to be successful, it will be necessary for the regulatory authority to have a high degree of confidence in the PSA. However, at the 1994 IAEA Technical Committee Meeting on Use of PSA in the Regulatory Process and at the OECD Nuclear Energy Agency Committee for Nuclear Regulatory Activities (CNRA) 'Special Issues' meeting in 1997 on Review Procedures and Criteria for Different Regulatory Applications of PSA, it was recognized that formal regulatory review guidance for PSA did not exist. The senior regulators noted that there was a need to produce some international guidance for reviewing PSAs to establish an agreed basis for assessing whether important technological and methodological issues in PSAs are treated adequately and to verify that conclusions reached are appropriate. In 1997, the IAEA and OECD Nuclear Energy Agency agreed to produce, in cooperation, guidance on Regulatory Review of PSA. This led to the publication of IAEA-TECDOC-1135 on the Regulatory Review of Probabilistic Safety Assessment (PSA) Level 1, which gives advice for the review of Level 1 PSA for initiating events occurring at power plants. This TECDOC extends the coverage to address the regulatory review of Level 2 PSA.These publications are intended to provide guidance to regulatory authorities on how to review the PSA for a nuclear power plant to gain confidence that it has been carried out to an acceptable level of quality so that it can be used as the

  20. Electron-cloud simulation results for the PSR and SNS

    Pivi, M.; Furman, M.A.

    2002-01-01

    We present recent simulation results for the main features of the electron cloud in the storage ring of the Spallation Neutron Source (SNS) at Oak Ridge, and updated results for the Proton Storage Ring (PSR) at Los Alamos. In particular, a complete refined model for the secondary emission process including the so called true secondary, rediffused and backscattered electrons has been included in the simulation code

  1. Methodology on ageing management review for main components of a PWR NPP

    Dou Yikang; He Yinbiao; Xu Xuelian; Zhang Ming; Liang Xingyun

    2005-01-01

    According to the requirements of NNSA, for Chinese operational NPPs periodical safety review (PSR) should be carried out every 10 years. Ageing management is one of the important safety factors to be reviewed. Entrusted by Qinshan Nuclear Power Plant (QNPP), Shanghai Nuclear Engineering Research and Design Institute (SNERDI) carried out the ageing management review (AMR), as a part of the first PSR of QNPP, from 2001 to 2003. This paper summarizes the methodology of the AMR process, including screening of critical components and structures, identification of main ageing mechanisms and their indicators and the tabulated review process, etc. 15 components and structures, hereafter referred as equipment, were selected as review objects based on their significance of safety, replaceability and cost-benefit considerations. To these objects, the main ageing mechanisms and relevant ageing indicators were identified according to specific working and environmental condition, design and manufacture information, operation and maintenance history, etc. The review can be divided into two parallel parts, the review for specific equipment and the review for overall management procedures and their implementation. To typical components, such as RPV and SG, fatigue analysis based on operational transient accounting was carried out to observe the actual safety margins. Through the review, the weaknesses in ageing management and potential threats to structural integrity were identified and thus continued improvement can be made in the next period of 10 years. (authors)

  2. Recent Timing Results for PSR B1259 - 63

    Wex, N.; Johnston, S.

    The binary pulsar PSR B1259 - 63 is in a highly eccentric 3.4 yr orbit around the Be star SS 2883. Timing observations of this pulsar, made over a 7 yr period using the Parkes 64 m radio-telescope, cover two periastron passages, in 1990 August and 1994 January. The timing observations of PSR B1259 - 63 clearly show evidence for timing noise which is domina ted by a cubic term. Unfortunately, the large amplitude timing noise and data over only two complete orbits make it difficult to produce a unique timing solution for this pulsar. However, if the long term behavior of timing noise is completely modeled by a cubic term, both dot ω and dot x terms are required in the timing model which could be a result of a precessing orbit caused by the quadrupole moment of the tilted companion star. In this paper we summarise the timing observations for the PSR B1259 - 63 system; full details are given in Wex et al. (1997).

  3. An international review of patient safety measures in radiotherapy practice

    Shafiq, Jesmin; Barton, Michael; Noble, Douglas; Lemer, Claire; Donaldson, Liam J.

    2009-01-01

    Errors from radiotherapy machine or software malfunction usually are well documented as they affect hundreds of patients, whereas random errors affecting individual patients are more difficult to be discovered and prevented. Although major clinical radiotherapy incidents have been reported, many more have remained unrecognised or have not been reported. The literature in this field is limited as it is mostly published as a result of investigation of major errors. We present a review of radiotherapy incidents internationally with the aim of identifying the domains where most errors occur through extensive review and synthesis of published reports, unpublished 'Grey literature' and departmental incident data. Our review of radiotherapy-related events in the last three decades (1976-2007) identified more than seven thousand (N = 7741) incidents and near misses. Three thousand one hundred and twenty-five incidents reported patient harm of variable intensity ranging from underdose increasing the risk of recurrence, to overdose causing toxicity, and even death for 1% (N = 38); 4616 events were near misses with no recognisable patient harm. Based on our review, a radiotherapy risk profile has been published by the WHO World Alliance for Patient Safety that highlights the role of communication, training and strict adherence to guidelines/protocols in improving the safety of radiotherapy process.

  4. Guidelines for the review research reactor safety. Reference document for IAEA Integrated Safety Assessment of Research Reactors (INSARR)

    1997-01-01

    In 1992, the IAEA published new safety standards for research reactors as part of the set of publications considered by its Research Reactor Safety Programme (RRSP). This set also includes publications giving guidance for all safety aspects related to the lifetime of a research reactor. In addition, the IAEA has also revised the Safety Standards for radiation protection. Consequently, it was considered advisable to revise the Integrated Safety Assessment of Research Reactors (INSARR) procedures to incorporate the new requirements and guidance as well as to extend the scope of the safety reviews to currently operating research reactors. The present report is the result of this revision. The purpose of this report is to give guidance on the preparation, execution, reporting and follow-up of safety review mission to research reactors as conducted by the IAEA under its INSARR missions safety service. However, it will also be of assistance to operators and regulators in conducting: (a) ad hoc safety assessments of research reactors to address individual issues such as ageing or safety culture; and (b) other types of safety reviews such as internal and peer reviews and regulatory inspections

  5. [A systematic review of the effectiveness of workplace safety interventions].

    Baldasseroni, A; Olimpi, Nadia; Bonaccorsi, G

    2009-01-01

    The authors carried out a systematic review of the effectiveness of workplace safety interventions, as a part of a wider project funded by CCM, Centre for Disease Control. Several electronic bibliographic databases were checked, using a standardized string selection. The string contained the following four items: the intervention; job features; type of injury; efficacy/effectiveness. Of the various databases consulted, Web of Science was the most efficient. Overall 5531 articles were selected. After reading the title and abstract, 4695 were excluded and eventually 35 systematic reviews were selected, which synthesized 769 original articles. The main topics of the selected systematic reviews were: certain sectors (building industry, agriculture, health care); personal protective equipment; work organization and prevention management at plant level; evaluation of prevention policies by national and regional authorities. A clear need for multiple bibliographical data-base search emerged at the end of this study.

  6. The safety of bone allografts used in dentistry: a review.

    Holtzclaw, Dan; Toscano, Nicholas; Eisenlohr, Lisa; Callan, Don

    2008-09-01

    Recent media reports concerning "stolen body parts" have shaken the public's trust in the safety of and the use of ethical practices involving human allografts. The authors provide a comprehensive review of the safety aspects of human bone allografts. The authors reviewed U.S. government regulations, industry standards, independent industry association guidelines, company guidelines and scientific articles related to the use of human bone allografts in the practice of dentistry published in the English language. The use of human bone allografts in the practice of dentistry involves the steps of procurement, processing, use and tracking. Rigorous donor screening and aseptic proprietary processing programs have rendered the use of human bone allografts safe and effective as a treatment option. When purchasing human bone allografts for the practice of dentistry, one should choose products accredited by the American Association of Tissue Banks for meeting uniformly high safety and quality control measures. Knowledge of human bone allograft procurement, processing, use and tracking procedures may allow dental clinicians to better educate their patients and address concerns about this valuable treatment option.

  7. Review of SFR Design Safety using Preliminary Regulatory PSA Model

    Na, Hyun Ju; Lee, Yong Suk; Shin, Andong; Suh, Nam Duk

    2013-01-01

    The major objective of this research is to develop a risk model for regulatory verification of the SFR design, and thereby, make sure that the SFR design is adequate from a risk perspective. In this paper, the development result of preliminary regulatory PSA model of SFR is discussed. In this paper, development and quantification result of preliminary regulatory PSA model of SFR is discussed. It was confirmed that the importance PDRC and ADRC dampers is significant as stated in the result of KAERI PSA model. However, the importance can be changed significantly depending on assumption of CCCG and CCF factor of PDRC and ADRC dampers. SFR (sodium-cooled fast reactor) which is Gen-IV nuclear energy system, is designed to accord with the concept of stability, sustainability and proliferation resistance. KALIMER-600, which is under development in Korea, includes passive safety systems (e. g. passive reactor shutdown, passive residual heat removal, and etc.) as well as active safety systems. Risk analysis from a regulatory perspective is needed to support the regulatory body in its safety and licensing review for SFR (KALIMER-600). Safety issues should be identified in the early design phase in order to prevent the unexpected cost increase and delay of the SFR licensing schedule that may be caused otherwise

  8. SRTC criticality safety technical review: Nuclear Criticality Safety Evaluation 93-04 enriched uranium receipt

    Rathbun, R.

    1993-01-01

    Review of NMP-NCS-930087, open-quotes Nuclear Criticality Safety Evaluation 93-04 Enriched Uranium Receipt (U), July 30, 1993, close quotes was requested of SRTC (Savannah River Technology Center) Applied Physics Group. The NCSE is a criticality assessment to determine the mass limit for Engineered Low Level Trench (ELLT) waste uranium burial. The intent is to bury uranium in pits that would be separated by a specified amount of undisturbed soil. The scope of the technical review, documented in this report, consisted of (1) an independent check of the methods and models employed, (2) independent HRXN/KENO-V.a calculations of alternate configurations, (3) application of ANSI/ANS 8.1, and (4) verification of WSRC Nuclear Criticality Safety Manual procedures. The NCSE under review concludes that a 500 gram limit per burial position is acceptable to ensure the burial site remains in a critically safe configuration for all normal and single credible abnormal conditions. This reviewer agrees with that conclusion

  9. Insights of the periodic reviews regarding the physical protection of nuclear power plants designed to earlier standards

    Hagemann, A.

    2001-01-01

    Among other prerequisites for licensing a nuclear activity, the German Atomic Energy Act stipulates that the necessary physical protection against malevolent acts has to be approved before granting a license. This is required for nuclear power plants in paragraph 7 of the Atomic Energy Act. The licenses for nuclear power plants designed to earlier standards were granted about 20 years ago and more. All NPPs are under the supervision of the Supervisory Authority in order to ensure that all conditions of the license are met during the whole plant operation period. The 'Periodic Safety Review', PSR, is designated to provide the Supervisory Authority with additional information on the safety status. One part of the PSR is the 'Deterministic Security Analysis', DSA. The subject of the DSA is the actual physical protection of a NPP. The following document outlines the experiences gained during the evaluation of DSA reports by GRS as an external expert organisation under contract of the Supervisory Authorities. (author)

  10. Guide for reviewing safety analysis reports for packaging: Review of quality assurance requirements

    Moon, D.W.

    1988-10-01

    This review section describes quality assurance requirements applying to design, purchase, fabrication, handling, shipping, storing, cleaning, assembly, inspection, testing, operation, maintenance, repair, and modification of components of packaging which are important to safety. The design effort, operation's plans, and quality assurance requirements should be integrated to achieve a system in which the independent QA program is not overly stringent and the application of QA requirements is commensurate with safety significance. The reviewer must verify that the applicant's QA section in the SARP contains package-specific QA information required by DOE Orders and federal regulations that demonstrate compliance. 8 refs

  11. Review of the DOE Packaging and Transportation Safety Program

    Snyder, B.J.; Cece, J.M.

    1992-12-01

    This report documents the results of a year-long self-assessment of DOE-EH transportation and packaging safety activities. The self-assessment was initiated in September 1991 and concluded in August 1992. The self-assessment identified several significant issues, some of which have been resolved by EH. Also, improvements in the EH program were made during the course of the self-assessment. The report reflects the status of the EH transportation and packaging safety activities at the conclusion of the self-assessment. This report consists of several sections which discuss background, objectives and description of the review. Another section includes summary discussion and key conclusions. Appendix A, Issues, Observations and Recommendations, lists fifteen issues, including appropriate observations and recommendations. A Corrective Action Plan, which documents EH managements resolve to implement the agreed-upon recommendations, is included. The Corrective Action Plan reflects the status of completed and planned actions as of the date of the report

  12. Modern diaper performance: construction, materials, and safety review.

    Dey, Swatee; Kenneally, Dianna; Odio, Mauricio; Hatzopoulos, Ioannis

    2016-07-01

    A review of the literature on diapers and diaper rash reveals that many clinicians are unfamiliar with modern diaper construction and materials as well as diaper safety testing methods. Typical modern diapers do not contain ingredients of concern such as latex and disperse dyes, but use ingredients such as spandex and pigments with a favorable safety profile. Today's disposable diaper is a high performance product whose carefully designed layers and liners provide optimal urine and feces absorption and an ever more clothing-like and comfortable fit. This is possible due to a variety of specialized polymer materials that provide optimal absorption of urine and feces, thereby minimizing skin exposure. © 2016 The International Society of Dermatology.

  13. How Swedish communities organised themselves in reviewing a safety case

    Soderblom, Anna-Lena

    2014-01-01

    Full text of publication follows: In 2009 the Swedish nuclear waste management company, SKB, choose Forsmark in the municipality of Oesthammar as the best place for a repository for spent nuclear fuel. In 2011, as a natural follow-up, SKB presented applications to two Swedish authorities, the Land and Environmental Court and the Swedish Radiation Safety Authority. The municipality of Oesthammar has together with the municipality of Oskarshamn been an active part in the process since 1994, with different local organisations financed by the Swedish nuclear fund. Three leading themes form the basis for our participation - voluntarism, complete openness of plans and results and participation with the possibility to influence. Site investigations for a repository started in 2002 and were finished when SKB selected Oesthammar municipality in the middle of 2009. To follow and scrutinise both site investigations as well as the applications, the organisation within the municipality has changed over time. As the site selection process got underway, the municipality extended its organisation to three committees (EIA, long-term safety and consultation). The committees have respective objectives: reviewing the health and environmental impact, reviewing the long-term safety and communication about the work that is going on within and around the municipality. These are primarily political committees to which a unit of civil servants is attached. The main goal for the organisation is to build up knowledge skills and prepare both the existing as well as the future municipality council for the decision of whether or not the municipality of Oesthammar will accept a final repository for spent nuclear fuel in our municipality. The absolutely most important issue for the municipality is long term-safety and as the process has progressed the municipality has made several statements to the authorities. (authors)

  14. Psr is involved in regulation of glucan production, and double deficiency of BrpA and Psr is lethal in Streptococcus mutans.

    Bitoun, Jacob P; Liao, Sumei; McKey, Briggs A; Yao, Xin; Fan, Yuwei; Abranches, Jacqueline; Beatty, Wandy L; Wen, Zezhang T

    2013-03-01

    Streptococcus mutans, the primary causative agent of dental caries, contains two paralogues of the LytR-CpsA-Psr family proteins encoded by brpA and psr, respectively. Previous studies have shown that BrpA plays an important role in cell envelope biogenesis/homeostasis and affects stress responses and biofilm formation by Strep. mutans, traits critical to cariogenicity of this bacterium. In this study, a Psr-deficient mutant, TW251, was constructed. Characterization of TW251 showed that deficiency of Psr did not have any major impact on growth rate. However, when subjected to acid killing at pH 2.8, the survival rate of TW251 was decreased dramatically compared with the parent strain UA159. In addition, TW251 also displayed major defects in biofilm formation, especially during growth with sucrose. When compared to UA159, the biofilms of TW251 were mainly planar and devoid of extracellular glucans. Real-time-PCR and Western blot analyses revealed that deficiency of Psr significantly decreased the expression of glucosyltransferase C, a protein known to play a major role in biofilm formation by Strep. mutans. Transmission electron microscopy analysis showed that deficiency of BrpA caused alterations in cell envelope and cell division, and the most significant defects were observed in TW314, a Psr-deficient and BrpA-down mutant. No such effects were observed with Psr mutant TW251 under similar conditions. These results suggest that while there are similarities in functions between BrpA and Psr, distinctive differences also exist between these two paralogues. Like Bacillus subtilis but different from Staphylococcus aureus, a functional BrpA or Psr is required for viability in Strep. mutans.

  15. Shielding modification and safety review on the nuclear ship 'Mutsu'

    Osanai, Masao

    1978-01-01

    The Japan Atomic Energy Commission (JAEC) called on the Japan Nuclear Ship Development Agency (JNSDA) for shielding modification and safety review on the nuclear ship ''Mutsu'', and JNSDA has conducted the research and development (R and D) to meet the request of JAEC for the above two items. Concerning the shield modification, the following matters are described: the study on the cause of radiation leakage which was concluded to the fast neutron streaming, the conceptual design for this modification, the mock up experiment for shielding utilizing JRR-4, the basic design following on the conceptual design, including the detailed drawings of the modified construction and the shielding analysis using RADHEAT-V3 code, and the relating experiments such as the heat transfer test of the primary shielding structure and the test of strength in stranding. As for the safety review, the survey of the troubles and the technical problems having been experienced in the light water reactor plants of land use, for example, fuel integrity, stress corrosion cracking and the leakage of steam generator tubes, the revision of the design so as to adapt to current safety standards and regulations, for example, in-service inspection, the setting of additional leak detectors in the primary cooling system, the modification of emergeney filters, etc., and the review of the design and construction corresponding to recent R and D works, such as re-evaluation of the core design, cooling capability of natural circulation, thermal stress analysis of main pipings, and the evaluation of ECCS performance are presented . (Nakai, Y.)

  16. Safety analysis and review system: a Department of Energy safety assurance tool

    Rosenthal, H.B.

    1981-01-01

    The concept of the Safety Analysis and Review System is not new. It has been used within the Department and its predecessor agencies, Atomic Energy Commission (AEC) and Energy Research and Development Administration (ERDA), for over 20 years. To minimize the risks from nuclear reactor and power plants, the AEC developed a process to support management authorization of each operation through identification and analysis of potential hazards and the measures taken to control them. As the agency evolved from AEC through ERDA to the Department of Energy, its responsibilities were broadened to cover a diversity of technologies, including those associated with the development of fossil, solar, and geothermal energy. Because the safety analysis process had proved effective in a technology of high potential hazard, the Department investigated the applicability of the process to the other technologies. This paper describes the system and discusses how it is implemented within the Department

  17. Brief review: sleep health and safety for transportation workers

    Quan SF

    2015-03-01

    Full Text Available Accidents related to sleepiness related fatigue are an important concern in transportation related industries. This brief review outlines the public safety concerns with sleepiness related fatigue in the railroad, aviation and motor vehicle transportation fields. In addition, the common causes of sleepiness related fatigue, and impact on operators and their families are highlighted. It is suggested that in addition to greater recognition and changes in duty hour regulations, there should be a greater emphasis on the education of operators on the importance of sleep and circadian factors in causing fatigue, as well as strategies to mitigate their impact.

  18. Response to Absorber-Focus Coil Preliminary Safety Review Panel

    Barr, Giles; Baynham, Elwyn; Black, Edgar; Bradshaw, Tom; Cummings, Mary Anne; Green, Michael A.; Ishimoto, Shigeru; Ivanyushenkov, Yury; Lau, Wing; Zisman, Michael S.

    2004-01-01

    In this document we provide responses to the various issues raised in the report of the Preliminary Safety Review Panel (see http://mice.iit.edu/mnp/MICE0069.pdf). In some cases we have made design changes in response to the Panels suggestions. In other cases, we have chosen not to do so. In a few cases, we indicate our plans, although the tasks have not yet been completed. For simplicity, the responses are organized along the same lines as those of the Panel Report

  19. Review of irradiation experiments for water reactor safety research

    Tobioka, Toshiaki

    1977-02-01

    A review is made of irradiation experiments for water reactor safety research under way in both commercial power plants and test reactors. Such experiments are grouped in two; first, LWR fuel performance under normal and abnormal operating conditions, and second, irradiation effects on fracture toughness in LWR vessels. In the former are fuel densification, swelling, and the influence of power ramp and cycling on fuel rod, and also fuel rod behavior under accident conditions in in-reactor experiment. In the latter are the effects of neutron exposure level on the ferritic steel of pressure vessels, etc.. (auth.)

  20. Team of experts concludes review of safety issues at Temelin

    2001-01-01

    Full text: At the request of the Czech Government, the International Atomic Energy Agency (IAEA) assembled a team of national experts from Bulgaria, France, Germany, Spain, and the United Kingdom, with an observer from Austria, to review safety issues at the Temelin power plant that were identified in 1996 as relevant to reactors of the generic Temelin design (WWER-1000/320 type). Following a detailed on-site review from 18 to 23 November 2001, the experts concluded that most identified issues had been addressed and resolved. Work is continuing on the few remaining issues. These issues, however, are not judged by them to be significant and would not from the experts' standpoint preclude the safe operation of the Temelin nuclear power plant. The final report of the team of experts will be available to the Czech Government in one month's time. (author)

  1. Experience in the review of utility control room design review and safety parameter display system programs

    Moore, V.A.

    1985-01-01

    The Detailed Control Room Design Review (DCRDR) and the Safety Parameter Display System (SPDS) had their origins in the studies and investigations conducted as the result of the TMI-2 accident. The President's Commission (Kemeny Commission) critized NRC for not examining the man-machine interface, over-emphasizing equipment, ignoring human beings, and tolerating outdated technology in control rooms. The Commission's Special Inquiry Group (Rogovin Report) recommended greater application of human factors engineering including better instrumentation displays and improved control room design. The NRC Lessons Learned Task Force concluded that licensees should review and improve control rooms using NRC Human engineering guidelines, and install safety parameter display systems (then called the safety staff vector). The TMI Action Plan Item I.D.1 and I.D.2 were based on these recommendations

  2. Fission, critical mass and safety-a historical review

    Meggitt, Geoff

    2006-01-01

    Since the discovery of fission, the notion of a chain reaction in a critical mass releasing massive amounts of energy has haunted physicists. The possibility of a bomb or a reactor prompted much of the early work on determining a critical mass, but the need to avoid an accidental critical excursion during processing or transport of fissile material drove much that took place subsequently. Because of the variety of possible situations that might arise, it took some time to develop adequate theoretical tools for criticality safety and the early assessments were based on direct experiment. Some extension of these experiments to closely similar situations proved possible, but it was not until the 1960s that theoretical methods (and computers to run them) developed enough for them to become reliable assessment tools. Validating such theoretical methods remained a concern, but by the end of the century they formed the backbone of criticality safety assessment. This paper traces the evolution of these methods, principally in the UK and USA, and summarises some related work concerned with the nature of criticality accidents and their radiological consequences. It also indicates how the results have been communicated and used in ensuring nuclear safety. (review)

  3. Integrated Approaches to Occupational Health and Safety: A Systematic Review.

    Cooklin, A; Joss, N; Husser, E; Oldenburg, B

    2017-09-01

    The study objective was to conduct a systematic review of the effectiveness of integrated workplace interventions that combine health promotion with occupational health and safety. Electronic databases (n = 8), including PsychInfo and MEDLINE, were systematically searched. Studies included were those that reported on workplace interventions that met the consensus definition of an "integrated approach," published in English, in the scientific literature since 1990. Data extracted were occupation, worksite, country, sample size, intervention targets, follow-up period, and results reported. Quality was assessed according to American College of Occupational and Environmental Medicine Practice Guidelines. Heterogeneity precluded formal meta-analyses. Results were classified according to the outcome(s) assessed into five categories (health promotion, injury prevention, occupational health and safety management, psychosocial, and return-on-investment). Narrative synthesis of outcomes was performed. A total of 31 eligible studies were identified; 23 (74%) were (quasi-)experimental trials. Effective interventions were most of those aimed at improving employee physical or mental health. Less consistent results were reported from integrated interventions targeting occupational health and safety management, injury prevention, or organizational cost savings. Integrated approaches have been posed as comprehensive solutions to complex issues. Empirical evidence, while still emerging, provides some support for this. Continuing investment in, and evaluation of, integrated approaches are worthwhile.

  4. Regulatory review of probabilistic safety assessment (PSA) level 1

    2000-02-01

    Probabilistic safety assessment (PSA) is increasingly being used as part of the decision making process to assess the level of safety of nuclear power plants. The methodologies in use are maturing and the insights gained from the PSAs are being used along with those from the deterministic analysis. Many regulatory authorities consider that the current state of the art in PSA (especially Level 1 PSA) is sufficiently well developed that it can be used centrally in the regulatory decision making process - referred to as 'risk informed regulation'. For these applications to be successful, it will be necessary for regulatory authorities to have a high degree of confidence in PSA. However, at the IAEA Technical Committee Meeting on Use of PSA in the Regulatory Process in 1994 and at the OECD Nuclear Energy Agency Committee for Nuclear Regulatory Activities (CNRA) 'Special Issues' Meeting in 1997 on Review Procedures and Criteria for Different Regulatory Applications of PSA, it was recognized that formal regulatory review guidance for PSA did not exist. The senior regulators noted that there was a need to produce some international guidance for reviewing PSAs to establish an agreed basis for assessing whether important technological and methodological issues in PSAs are treated adequately and to verify that conclusions reached are appropriate. In 1997 the IAEA and OECD Nuclear Energy Agency agreed to produce in co-operation a technical document on the regulatory review of PSA. This publication is intended to provide guidance to regulatory authorities on how to review the PSA for a nuclear power plant to gain confidence that it has been carried out to an acceptable standard so that it can be used as the basis for taking risk informed decisions within a regulatory decision making process. The document gives guidance on how to set about reviewing a PSA and on the technical issues that need to be addressed. This publication gives guidance for the review of Level 1 PSA for

  5. Lessons learned from the Galileo and Ulysses flight safety review experience

    Bennett, Gary L.

    1998-01-01

    In preparation for the launches of the Galileo and Ulysses spacecraft, a very comprehensive aerospace nuclear safety program and flight safety review were conducted. A review of this work has highlighted a number of important lessons which should be considered in the safety analysis and review of future space nuclear systems. These lessons have been grouped into six general categories: (1) establishment of the purpose, objectives and scope of the safety process; (2) establishment of charters defining the roles of the various participants; (3) provision of adequate resources; (4) provision of timely peer-reviewed information to support the safety program; (5) establishment of general ground rules for the safety review; and (6) agreement on the kinds of information to be provided from the safety review process

  6. Packaging review guide for reviewing safety analysis reports for packagings: Revision 0

    Fischer, L.E.; Chou, C.K.; Lloyd, W.R.; Mount, M.E.; Nelson, T.A.; Schwartz, M.W.; Witte, M.C.

    1987-09-01

    The Department of Energy (DOE) has established procedures for obtaining certification of packagings used by DOE and its contractors for the transport of radioactive materials. These certification review policies and procedures are established to ensure that DOE packaging designs and operations meet safety criteria at least equivalent to the standards prescribed by the Nuclear Regulatory Commission (NRC) certification process for packaging. The Packaging Review Guide (PRG) is not a DOE order, but has been prepared as guidance for the Packaging Certification Staff (PCS) under the Certifying Official, Office of Security Evaluations, or designated representatives. The principal purpose of the PRG is to assure the quality and uniformity of PCS reviews, and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The PRG also sets forth solutions and approaches determined to be acceptable in the past by the PCS in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a SARP does not have to follow the solutions or approaches presented in the PRG. However, applicants should recognize that the PCS has spent substantial time and effort in reviewing and developing their positions for the issues. A corresponding amount of time and effort will probably be required to review and accept new or different solutions and approaches. Finally, it is also a purpose of the PRG to make information about DOE certification policy and procedures widely available to DOE field offices, DOE contractors, federal agencies, and interested members of the public. 7 refs., 15 figs., 14 tabs

  7. A review on safety and efficacy of products containing Longifolia

    Abdul Hafeez Ahmad Hamdi

    2016-01-01

    Full Text Available Eurycoma longifolia (commonly called tongkat ali is a flowering plant in the family Simaroubaceae, native to Indonesia, Malaysia, and, to a lesser extent, Thailand, Vietnam and also Laos. The roots extract of E. longifolia, is a well-known traditional herbal medicine in Asia used for many purposes such as sexual dysfunction, aging, malaria, cancer, diabetes, anxiety, aches, constipation, exercise recovery, fever, increased energy, increased strength, leukemia, osteoporosis, stress, syphilis and glandular swelling. The roots are also used as an aphrodisiac, antibiotic, appetite stimulant and health supplement. It is very important to conserve this valuable medicinal plant for the health benefit of future generations. The purpose of this review article is to evaluate and summarize the existing literatures regarding the efficacy and safety of products which contain E. longifolia as its main ingredient. In summary, based on the literature evaluated in this review article, products which contain tongkat ali showed a clinical benefit on improving erectile dysfunction as well as a good safety profile. We recommend consumers to check the level of the bioactive compound “eurycomanone” as their guide before choosing any E. longifolia product.

  8. Development of Safety Assessment Information System (SAIS)

    Park, Byung Shik; Lee, Kyung Jin; Lee, Byung Chul [FNC Tech. Co. Ltd. SNU, Seoul (Korea, Republic of); Song, Tae Young; Lee, Chang Ho [KHNP, Daejeon (Korea, Republic of)

    2007-10-15

    Many reports and documents about nuclear power plant safety analysis like a Periodic Safe Review (PSR), Periodic Safety Analysis (PSA) and Severe Accident Management Guideline (SAMG) come to be drawn up from KHNP. Since these are not arranged easy to look up, the systematic arrangement of data was necessary. The solution against hereupon is to store database, and it was developed with the name, SAIS, by FNC Tech. Co. together with NETEC KHNP. In this web program it is easy to manage (registration, search and statistics) data. And the authorized user can approach this system. This was developed, and was verified under the development environment of; - Web Server : Apache 2.2.5 - Program Language : PHP 5.2 - DBMS : Oracle 10g.

  9. Development of Safety Assessment Information System (SAIS)

    Park, Byung Shik; Lee, Kyung Jin; Lee, Byung Chul; Song, Tae Young; Lee, Chang Ho

    2007-01-01

    Many reports and documents about nuclear power plant safety analysis like a Periodic Safe Review (PSR), Periodic Safety Analysis (PSA) and Severe Accident Management Guideline (SAMG) come to be drawn up from KHNP. Since these are not arranged easy to look up, the systematic arrangement of data was necessary. The solution against hereupon is to store database, and it was developed with the name, SAIS, by FNC Tech. Co. together with NETEC KHNP. In this web program it is easy to manage (registration, search and statistics) data. And the authorized user can approach this system. This was developed, and was verified under the development environment of; - Web Server : Apache 2.2.5 - Program Language : PHP 5.2 - DBMS : Oracle 10g

  10. Phenomenological Studies on Sodium for CSP Applications: A Safety Review

    Armijo, Kenneth Miguel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Concentrating Solar Technologies Dept.; Andraka, Charles E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Concentrating Solar Technologies Dept.

    2016-09-01

    Sodium as a heat transfer fluid (HTF) can achieve temperatures above 700°C to improve power cycle performance for reducing large infrastructure costs of high-temperature systems. Current concentrating solar power (CSP) sensible HTF’s (e.g. air, salts) have poor thermal conductivity, and thus low heat transfer capabilities, requiring a large receiver. The high thermal conductivity of sodium has demonstrated high heat transfer rates on dish and towers systems, which allow a reduction in receiver area by a factor of two to four, reducing re-radiation and convection losses and cost by a similar factor. Sodium produces saturated vapor at pressures suitable for transport starting at 600°C and reaches one atmosphere at 870°C, providing a wide range of suitable latent operating conditions that match proposed high temperature, isothermal input power cycles. This advantage could increase the receiver and system efficiency while lowering the cost of CSP tower systems. Although there are a number of desirable thermal performance advantages associated with sodium, its propensity to rapidly oxidize presents safety challenges. This investigation presents a literature review that captures historical operations/handling lessons for advanced sodium systems, and the current state-of-knowledge related to sodium combustion behavior. Technical and operational solutions addressing sodium safety and applications in CSP will be discussed, including unique safety hazards and advantages using latent sodium. Operation and maintenance experience from the nuclear industry with sensible and latent systems will also be discussed in the context of safety challenges and risk mitigation solutions.

  11. Los Alamos Proton Storage Ring (PSR) injection deflector system

    Jason, A.j.; Higgins, E.F.; Koelle, A.R.

    1983-01-01

    We describe a pulsed magnetic deflector system planned for the injection system of the PSR. Two sets of magnets, appropriately placed in the optical systems of both the ring and the injection transport line, provide control of the rate at which particles are injected into a given portion of transverse phase space and limit the interaction of stored beam with the injection stripping foil. High-current modulators that produce relatively complex waveforms are required for this purpose. Solid-state drivers using direct feedback to produce the necessary waveforms are discussed as replacements for the more conventional high-voltage tube technology

  12. On the age of PSR B1509-58

    Gvaramadze, V. V.

    2001-01-01

    It is generally accepted that the PSR B1509-58 is associated with the supernova remnant (SNR) MSH 15-52 (G 320.4-01.2). The spin-down age of the pulsar is \\simeq 1700 years, while the size and the general appearance of the SNR suggest that this system is much older. A few possible explanations of this discrepancy have been put forward. We offer an alternative one and suggest that the high spin-down rate of the pulsar characterizes only a relatively short period of its (present) spin history, ...

  13. Gamma radiation from PSR B1055-52

    Thompson, D.J.; Bailes, M.; Bertsch, D.L.

    1999-01-01

    The telescopes on the Compton Gamma Ray Observatory (CGRO) have observed PSR B1055-52 a number of times between 1991 and 1998. From these data a more detailed picture of the gamma radiation from this source has been developed, showing several characteristics that distinguish this pulsar: the light...... curve is complex; there is no detectable unpulsed emission; the energy spectrum is hat, with no evidence of a sharp high-energy cutoff up to greater than 4 GeV. Comparisons of the gamma-ray data with observations at longer wavelengths show that no two of the known gamma-ray pulsars have quite the same...

  14. Status of the WNR/PSR at Los Alamos

    Silver, R.N.

    1982-01-01

    A proton storage ring is presently under construction at Los Alamos for initial operation in 1985 to provide the world's highest peak neutron flux for neutron scattering experiments. The operational WNR pulsed neutron source is in use for TOF instrument development and condensed matter research. Experimental results have been obtained in incoherent inelastic scattering, liquids and powder diffraction, single crystal diffraction and eV spectroscopy using nuclear resonances. Technical problems being addressed include chopper phasing, scintillator detector development, shielding and collimation. A crystal analyzer spectrometer in the constant Q configuration is being assembled. The long range plan for the WNR/PSR facility is described

  15. Phylogenetic distribution and membrane topology of the LytR-CpsA-Psr protein family

    Berger-Bächi Brigitte

    2008-12-01

    Full Text Available Abstract Background The bacterial cell wall is the target of many antibiotics and cell envelope constituents are critical to host-pathogen interactions. To combat resistance development and virulence, a detailed knowledge of the individual factors involved is essential. Members of the LytR-CpsA-Psr family of cell envelope-associated attenuators are relevant for β-lactam resistance, biofilm formation, and stress tolerance, and they are suggested to play a role in cell wall maintenance. However, their precise function is still unknown. This study addresses the occurrence as well as sequence-based characteristics of the LytR-CpsA-Psr proteins. Results A comprehensive list of LytR-CpsA-Psr proteins was established, and their phylogenetic distribution and clustering into subgroups was determined. LytR-CpsA-Psr proteins were present in all Gram-positive organisms, except for the cell wall-deficient Mollicutes and one strain of the Clostridiales. In contrast, the majority of Gram-negatives did not contain LytR-CpsA-Psr family members. Despite high sequence divergence, the LytR-CpsA-Psr domains of different subclusters shared a highly similar, predicted mixed a/β-structure, and conserved charged residues. PhoA fusion experiments, using MsrR of Staphylococcus aureus, confirmed membrane topology predictions and extracellular location of its LytR-CpsA-Psr domain. Conclusion The LytR-CpsA-Psr domain is unique to bacteria. The presence of diverse subgroups within the LytR-CpsA-Psr family might indicate functional differences, and could explain variations in phenotypes of respective mutants reported. The identified conserved structural elements and amino acids are likely to be important for the function of the domain and will help to guide future studies of the LytR-CpsA-Psr proteins.

  16. 75 FR 54915 - Meeting of the Public Safety Officer Medal of Valor Review Board

    2010-09-09

    ... Safety Officer Medal of Valor Review Board AGENCY: Office of Justice Programs (OJP), Justice. ACTION... Officer Medal of Valor Review Board to vote on recommendations for the 2009-2010 Medal of Valor... Public Safety Officer Medal of Valor Review Board carries out those advisory functions specified in 42 U...

  17. Packaging review guide for reviewing safety analysis reports for packagings: Revision 1

    Fisher, L.E.; Chou, C.K.; Lloyd, W.R.; Mount, M.E.; Nelson, T.A.; Schwartz, M.W.; Witte, M.C.

    1988-10-01

    The Department of Energy (DOE) has established procedures for obtaining certification of packagings used by DOE and its contractors for the transport of radioactive materials. The principal purpose of this document is to assure the quality and uniformity of PCS reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The Packaging Review Guide (PRG) also sets forth solutions and approaches determined to be acceptable in the past in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a SARP does not have to follow the solutions or approaches presented. It is also a purpose of the PRG to make information about DOE certification policy and procedures widely available to DOE field offices, DOE contractors, federal agencies, and interested members of the public. 77 refs., 16 figs., 15 tabs

  18. Periodic Safety Review of Nuclear Power Plants: Experience of Member States

    2010-04-01

    Routine reviews of nuclear power plant operation (including modifications to hardware and procedures, operating experience, plant management and personnel competence) and special reviews following major events of safety significance are the primary means of safety verification. In addition, many Member States of the IAEA have initiated systematic safety reassessments, termed periodic safety reviews, of nuclear power plants, to assess the cumulative effects of plant ageing and plant modifications, operating experience, technical developments and siting aspects. The reviews include an assessment of plant design and operation against current safety standards and practices, and they have the objective of ensuring a high level of safety throughout the plant's operating lifetime. They are complementary to the routine and special safety reviews and do not replace them. Periodic safety reviews of nuclear power plants are considered an effective way to obtain an overall view of actual plant safety, and to determine reasonable and practical modifications that should be made in order to maintain a high level of safety. They can be used as a means of identifying time limiting features of the plant in order to determine nuclear power plant operation beyond the designed lifetime. The periodic safety review process can be used to support the decision making process for long term operation or licence renewal. Since 1994, the use of periodic safety reviews by Member States has substantially broadened and confirmed its benefits. Periodic safety review results have, for example, been used by some Member States to help provide a basis for continued operation beyond the current licence term, to communicate more effectively with stakeholders regarding nuclear power plant safety, and to help identify changes to plant operation that enhance safety. This IAEA-TECDOC is intended to assist Member States in the implementation of a periodic safety review. This publication complements the

  19. Review of key Belotero Balance safety and efficacy trials.

    Lorenc, Z Paul; Fagien, Steven; Flynn, Timothy C; Waldorf, Heidi A

    2013-10-01

    Belotero Balance is a novel highly cross-linked hyaluronic acid that uses cohesive polydensified matrix technology to achieve cohesive gel; improved adaptation by the dermis; and a soft, smooth fill. Several studies have now compared Belotero Balance to bovine collagen and other hyaluronic acids. Two pivotal studies demonstrated the noninferiority and superiority of Belotero Balance to bovine collagen. In the first study, more than half of the patients maintained optimal correction at 6 months on the Belotero-treated side of the face. The second of those two studies followed patients to week 96 and demonstrated that the effects of Belotero Balance in this long-term, open-label study persisted in the majority of subjects without repeated treatment for at least one interval of 48 weeks. The filler was well tolerated, with only one of 34 total adverse events (injection-site bruising) considered to be related to the study device. A third study compared the safety and efficacy of other hyaluronic acids (i.e., Juvéderm and Restylane) with Belotero Balance. In this study, the safety profiles of all three hyaluronic acids were generally favorable, with site-specific adverse events mild to moderate and comparable across each hyaluronic acid. Aesthetic results were also similar, although Belotero Balance resulted in greater evenness than Restylane at 4 weeks by one indicator used in the study. Finally, a 5-year retrospective safety review of 317 patients treated with Belotero Balance over a 5-year period revealed no severe adverse events in any patients, including the absence of persistent nodules or granulomas.

  20. Reviewing real-time performance of nuclear reactor safety systems

    Preckshot, G.G. [Lawrence Livermore National Lab., CA (United States)

    1993-08-01

    The purpose of this paper is to recommend regulatory guidance for reviewers examining real-time performance of computer-based safety systems used in nuclear power plants. Three areas of guidance are covered in this report. The first area covers how to determine if, when, and what prototypes should be required of developers to make a convincing demonstration that specific problems have been solved or that performance goals have been met. The second area has recommendations for timing analyses that will prove that the real-time system will meet its safety-imposed deadlines. The third area has description of means for assessing expected or actual real-time performance before, during, and after development is completed. To ensure that the delivered real-time software product meets performance goals, the paper recommends certain types of code-execution and communications scheduling. Technical background is provided in the appendix on methods of timing analysis, scheduling real-time computations, prototyping, real-time software development approaches, modeling and measurement, and real-time operating systems.

  1. Reviewing real-time performance of nuclear reactor safety systems

    Preckshot, G.G.

    1993-08-01

    The purpose of this paper is to recommend regulatory guidance for reviewers examining real-time performance of computer-based safety systems used in nuclear power plants. Three areas of guidance are covered in this report. The first area covers how to determine if, when, and what prototypes should be required of developers to make a convincing demonstration that specific problems have been solved or that performance goals have been met. The second area has recommendations for timing analyses that will prove that the real-time system will meet its safety-imposed deadlines. The third area has description of means for assessing expected or actual real-time performance before, during, and after development is completed. To ensure that the delivered real-time software product meets performance goals, the paper recommends certain types of code-execution and communications scheduling. Technical background is provided in the appendix on methods of timing analysis, scheduling real-time computations, prototyping, real-time software development approaches, modeling and measurement, and real-time operating systems

  2. Employing ionizing radiation to enhance food safety. A review

    Grolichova, M.; Dvorak, P.; Musilova, H.

    2004-01-01

    Food irradiation is employed to ensure food safety or food sterility, extend its shelf-life and reduce the losses due to sprouting, ripening or pests. In the Czech Republic mainly spices, mixed spices and dried vegetables are exposed to ionizing radiation. The leading suppliers of irradiated foodstuffs in Europe are Belgium, France and the Netherlands. In the USA, food irradiation is more common and there are also attempts to enforce irradiation not only for food safety, but also for technological purposes. Even though irradiation is a prospective technology, its application causes physico-chemical changes that may affect nutritional adequacy and sensory characteristics of irradiated food. In this paper, the chemical changes of basic food components (proteins, saccharides, fats) are reviewed. Some chemical changes lead to the formation of radiolytic products whose risks are still subject of scientific research. It is expected that the main use of gamma irradiation will be the treatment of diets for patients suffering from different disorders of the immune system, allergic patients or for the army and space flights. Irradiation may be a critical control point in the production of some types of foodstuffs

  3. Safety of treatment options for spondyloarthritis: a narrative review.

    D'Angelo, Salvatore; Carriero, Antonio; Gilio, Michele; Ursini, Francesco; Leccese, Pietro; Palazzi, Carlo

    2018-05-01

    Spondyloarthritis (SpA) are chronic inflammatory diseases with overlapping pathogenic mechanisms and clinical features. Treatment armamentarium against SpA includes non-steroidal anti-inflammatory drugs, glucocorticoids, conventional disease-modifying antirheumatic drugs (DMARDs, including sulfasalazine, methotrexate, leflunomide, cyclosporine), targeted synthetic DMARDs (apremilast) and biological DMARDs (TNF inhibitors, anti-IL 12/23 and anti-IL-17 agents). Areas covered: A narrative review of published literature on safety profile of available SpA treatment options was performed. Readers will be provided with a comprehensive overview on frequent and rare adverse events associated with each drug listed in current SpA treatment recommendations. Expert opinion: The overall safety profile of such molecules is good and serious adverse events are rare but need to be promptly recognized and treated. However, the monitoring of adverse events is a major challenge for clinicians because it is not adequately addressed by current treatment recommendations. A tailored treatment is crucial and rheumatologists must accurately select patients in order to identify those more susceptible to develop adverse events.

  4. Westinghouse independent safety review of Savannah River production reactors

    Leggett, W.D.; McShane, W.J. (Westinghouse Hanford Co., Richland, WA (USA)); Liparulo, N.J.; McAdoo, J.D.; Strawbridge, L.E. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear and Advanced Technology Div.); Toto, G. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear Services Div.); Fauske, H.K. (Fauske and Associates, Inc., Burr Ridge, IL (USA)); Call, D.W. (Westinghouse Savannah R

    1989-04-01

    Westinghouse Electric Corporation has performed a safety assessment of the Savannah River production reactors (K,L, and P) as requested by the US Department of Energy. This assessment was performed between November 1, 1988, and April 1, 1989, under the transition contract for the Westinghouse Savannah River Company's preparations to succeed E.I. du Pont de Nemours Company as the US Department of Energy contractor for the Savannah River Project. The reviewers were drawn from several Westinghouse nuclear energy organizations, embody a combination of commercial and government reactor experience, and have backgrounds covering the range of technologies relevant to assessing nuclear safety. The report presents the rationale from which the overall judgment was drawn and the basis for the committee's opinion on the phased restart strategy proposed by E.I. du Pont de Nemours Company, Westinghouse, and the US Department of Energy-Savannah River. The committee concluded that it could recommend restart of one reactor at partial power upon completion of a list of recommended upgrades both to systems and their supporting analyses and after demonstration that the organization had assimilated the massive changes it will have undergone.

  5. Westinghouse independent safety review of Savannah River production reactors

    Leggett, W.D.; McShane, W.J.; Liparulo, N.J.; McAdoo, J.D.; Strawbridge, L.E.; Call, D.W.

    1989-01-01

    Westinghouse Electric Corporation has performed a safety assessment of the Savannah River production reactors (K, L, and P) as requested by the US Department of Energy. This assessment was performed between November 1, 1988, and April 1, 1989, under the transition contract for the Westinghouse Savannah River Company's preparations to succeed E.I. du Pont de Nemours ampersand Company as the US Department of Energy contractor for the Savannah River Project. The reviewers were drawn from several Westinghouse nuclear energy organizations, embody a combination of commercial and government reactor experience, and have backgrounds covering the range of technologies relevant to assessing nuclear safety. The report presents the rationale from which the overall judgment was drawn and the basis for the committee's opinion on the phased restart strategy proposed by E.I. du Pont de Nemours ampersand Company, Westinghouse, and the US Department of Energy-Savannah River. The committee concluded that it could recommend restart of one reactor at partial power upon completion of a list of recommended upgrades both to systems and their supporting analyses and after demonstration that the organization had assimilated the massive changes it will have undergone. 37 refs., 1 fig., 3 tabs

  6. The Spin-down of PSR B1509-58

    Gvaramadze, V. V.

    It is generally accepted that the PSR B1509-58 is associated with the supernova remnant (SNR) MSH 15-52 . The spin-down age of the pulsar is years, while the size and the general appearance of the SNR suggest that this system is much older. A few possible explanations of this discrepancy have been put forward. We offer an alternative one and suggest that the high spin-down rate of the pulsar characterizes only a relatively short period of its (present) spin history, and that the enhanced braking torque is connected with the interaction between the pulsar's magnetosphere and the dense matter of a circumstellar clump (created during the late evolutionary stages of the supernova (SN) progenitor star). Our suggestion implies that the "true" age of PSR B1509-58 could be much larger than the spin-down age, and therefore the SNR MSH 15-52 is a middle-aged remnant similar to the Vela SNR. Some possible consequences of our suggestion are discussed.

  7. Statin Therapy: Review of Safety and Potential Side Effects.

    Ramkumar, Satish; Raghunath, Ajay; Raghunath, Sudhakshini

    2016-11-01

    Hydroxymethyl glutaryl coenzyme A reductase inhibitors, commonly called statins, are some of the most commonly prescribed medications worldwide. Evidence suggests that statin therapy has significant mortality and morbidity benefit for both primary and secondary prevention from cardiovascular disease. Nonetheless, concern has been expressed regarding the adverse effects of long term statin use. The purpose of this article was to review the current medical literature regarding the safety of statins. Major trials and review articles on the safety of statins were identified in a search of the MEDLINE database from 1980 to 2016, which was limited to English articles. Myalgia is the most common side effect of statin use, with documented rates from 1-10%. Rhabdomyolysis is the most serious adverse effect from statin use, though it occurs quite rarely (less than 0.1%). The most common risk factors for statin-related myopathy include hypothyroidism, polypharmacy and alcohol abuse. Derangement in liver function tests is common, affecting up to 1% of patients; however, the clinical significance of this is unknown. Some statin drugs are potentially diabetogenic and the risk appears to increase in those patients on higher doses. Pitavastatin has not been associated with increased risk of diabetes. Statins have not been proven to increase the risk of malignancy, dementia, mood disorders or acute interstitial nephritis. However, statins do have multiple drug interactions, primarily those which interact with the cytochrome p450 enzyme group. Overall, statin drugs appear to be safe for use in the vast majority of patients. However, patients with multiple medical co-morbidities are at increased risk of adverse effects from long-term statin use.

  8. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    Herborn, D.I.

    1991-10-01

    The requirements for Westinghouse Hanford independent review of the Preliminary Safety Analysis Report (PSAR) are contained in Section 1.0, Subsection 4.3 of WCH-CM-4-46. Specifically, this manual requires the following: (1) Formal functional reviews of the HWVP PSAR by the future operating organization (HWVP Operations), and the independent review organizations (HWVP and Environmental Safety Assurance, Environmental Assurance, and Quality Assurance); and (2) Review and approval of the HWVP PSAR by the Tank Waste Disposal (TWD) Subcouncil of the Safety and Environmental Advisory Council (SEAC), which provides independent advice to the Westinghouse Hanford President and executives on matters of safety and environmental protection. 7 refs

  9. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  10. A systematic review of occupational safety and health business cases.

    Verbeek, Jos; Pulliainen, Marjo; Kankaanpää, Eila

    2009-12-01

    Business cases are commonly developed as means to rationalize investment. We systematically reviewed 26 reported cases on occupational safety and health (OSH) interventions to assess if health and productivity arguments make a good business case. To be included in the review, studies had to analyze the costs and benefits, including productivity, of an OSH intervention at the enterprise level. We searched Medline and Embase for studies and used Google search in addition. Two reviewers independently selected studies and extracted data. The intervention profitability was calculated in euros (euro in 2008) as the first year's benefits minus the total intervention costs per worker. The payback period was calculated as the intervention costs divided by the first year's benefits. We found three ex-ante and 23 ex-post cases. In 20 cases, the study design was a before-after comparison without a control group. Generally a 100% reduction of injuries or sickness absence was assumed. In two cases, productivity and quality increases were very large. The main benefit was avoided sick leave. Depreciation or discounting was applied only in a minority of cases. The intervention profitability was negative in seven studies, up to euro 500 per employee in 12 studies and more than euro 500 per employee in seven studies. The payback period was less than half a year for 19 studies. Only a few studies included sensitivity analyses. Few ex-ante business cases for management decisions on OSH are reported. Guidelines for reporting and evaluation are needed. Business cases need more sound assumptions on the effectiveness of interventions and should incorporate greater uncertainty into their design. Ex-post evaluation should be based preferably on study designs that control for trends at a time different from that of the intervention.

  11. Use of FPGA and CPLD in nuclear reactor safety systems and its regulatory review requirements for reactor safety

    Roy, Suvadip; Biswas, Animesh; Pradhan, S.K.

    2015-01-01

    Field Programmable Gate Arrays (FPGA) and Complex Programmable Logic Devices (CPLD) is being used widely in safety critical and safety related systems in nuclear power plans like in trip logic units, Engineered Safety Feature (ESF) actuation decision logic and neutronic signal processing for their reprogrammability feature and compact design. These HDL Programmable devices (HPD) are complex devices consisting of both hardware and software which is used to implement the logic on the FPGA. It is observed that these Programmable devices suffer from various modes of failure and the major failures in these devices are due to Single Event Upset (SEU), where a highly energetic ionizing radiation may lead to device failure which can even occur in radiologically benign environment. Other failures can occur during steps of developing the hardware using software tools like during Synthesis and placement and routing of the desired hardware. Here a study on use of such devices in Nuclear Reactors, study on mode of failures of these devices, way to tackle such failure and development of review guidelines for review of such devices used in safety critical and safety related systems with special emphasis on choice of software tools, way to mitigate effects of SEU and simulation and hardware testing results to be reviewed by regulatory body during design safety review is done. (author)

  12. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Wilmot, Roger D.

    2011-02-01

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  13. Organization and conduct of IAEA fire safety reviews at nuclear power plants

    1998-01-01

    The importance of fire safety in the safe and productive operation of nuclear power plants is recognized worldwide. Lessons learned from experience in nuclear power plants indicate that fire poses a real threat to nuclear safety and that its significance extends far beyond the scope of a conventional fire hazard. With a growing understanding of the close correlation between the fire hazard in nuclear power plants and nuclear safety, backfitting for fire safety has become necessary for a number of operating plants. However, it has been recognized that the expertise necessary for a systematic independent assessment of fire safety of a NPP may not always be available to a number of Member States. In order to assist in enhancing fire safety, the IAEA has already started to offer various services to Member States in the area of fire safety. At the request of a Member State, the IAEA may provide a team of experts to conduct fire safety reviews of varying scope to evaluate the adequacy of fire safety at a specific nuclear power plant during various phases such as construction, operation and decommissioning. The IAEA nuclear safety publications related to fire protection and fire safety form a common basis for these reviews. This report provides guidance for the experts involved in the organization and conduct of fire safety review services to ensure consistency and comprehensiveness of the reviews

  14. Green light for the methodology file. Periodical safety review 2016 has begun

    2014-01-01

    Every ten years, the organisational framework and the facilities of the Belgian Nuclear Research Center SCK-CEN are subject to an encompassing safety evaluation. Together with initiatives arising from the stress tests, a large number of safety studies and actions are scheduled until 2018. The article discusses the ongoing safety review.

  15. A review of the safety aspects of radio frequency ablation

    Abhishek Bhaskaran

    2015-09-01

    Full Text Available In light of recent reports showing high incidence of silent cerebral infarcts and organized atrial arrhythmias following radiofrequency (RF atrial fibrillation (AF ablation, a review of its safety aspects is timely. Serious complications do occur during supraventricular tachycardia (SVT ablations and knowledge of their incidence is important when deciding whether to proceed with ablation. Evidence is emerging for the probable role of prophylactic ischemic scar ablation to prevent VT. This might increase the number of procedures performed. Here we look at the various complications of RF ablation and also the methods to minimize them. Electronic database was searched for relevant articles from 1990 to 2015. With better awareness and technological advancements in RF ablation the incidence of complications has improved considerably. In AF ablation it has decreased from 6% to less than 4% comprising of vascular complications, cardiac tamponade, stroke, phrenic nerve injury, pulmonary vein stenosis, atrio-esophageal fistula (AEF and death. Safety of SVT ablation has also improved with less than 1% incidence of AV node injury in AVNRT ablation. In VT ablation the incidence of major complications was 5–11%, up to 3.4%, up to 1.8% and 4.1–8.8% in patients with structural heart disease, without structural heart disease, prophylactic ablations and epicardial ablations respectively. Vascular and pericardial complications dominated endocardial and epicardial VT ablations respectively. Up to 3% mortality and similar rates of tamponade were reported in endocardial VT ablation. Recent reports about the high incidence of asymptomatic cerebral embolism during AF ablation are concerning, warranting more research into its etiology and prevention.

  16. Strengthening of the nuclear safety regulatory body. Field evaluation review

    1996-10-01

    As a result of a request from the Preparation Committee of the Nuclear Regulatory Authority (NRA) in 1992, and as recommended by the CEC/RAMG (Commission of European Communities/Regulatory Assistance Management Group) and the Agency mission in July 1993 to the Slovak Republic, the project SLR/9/005 was approved in 1993 as a model project for the period 1994-1996. Current budge is $401,340 and disbursements to date amount to $312,873. The project time schedule has been extended to 1997. The major conclusions of this evaluation are as follows: The project responded to an urgent national need, as well as to a statutory mandate of the Agency, and was adequately co-ordinated with other international assistance programmes to NRA. The project was designed as a structured programme of assistance by means of expert missions, scientific visits and a limited amount of equipment, acting upon several key areas of NRA regulatory responsibilities. Agency assistance was provided in a timely manner. A high concentration of expert missions was noticed at the initial stages of the project, which posed some managements problems. This was corrected to some extent in the course of implementation. Additionally, some overlapping of expert mission recommendations suggests that improvements are needed in the design of such missions. The exposure to international regulatory practice and expertise has resulted in substantial developments of NRA, both in organizational and operational terms. The project can claim to have contributed to NRA having gained governmental and international confidence. NRA's role in the safety assessment of Bohunice V1 reconstruction, as well as in Bohunice V2 safety review, Bohunice A1 decommissioning and in informing the public, also points at the success achieved by the project. The institutional and financial support of the Government contributed decisively to the project achievements. (author). Figs, tabs

  17. Safety review for human factors engineering and control rooms of nuclear power plants

    Yang Mengzhuo

    1998-01-01

    Safety review for human factors engineering and control rooms of nuclear power plants (NPP) is in a forward position of science and technology, which began at American TMI severe accident and had been implemented in China. The importance and the significance of the safety review are expounded, the requirements of its scope and profundity are explained in detail. In addition, the situation of the technical document system for nuclear safety regulation on human factors engineering and control rooms of NPP in China is introduced briefly, on which the safety review is based

  18. SSI and SKI's Review of SKB's Updated Final Safety Report for SFR 1. Review Report

    2003-10-01

    The Repository for Radioactive Operational Waste (SFR 1) is now the object of a new review by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). One of the stipulations for operating SFR 1 was that a new assessment of the long-term performance and environmental consequences of the repository should be conducted once every 10 years by the licensee, the Swedish Nuclear Fuel and Waste Management Co (SKB). During the time that SFR 1 has been in operation, experience has been gained of operating the facility and new knowledge of long-term performance of SFR 1 has been obtained. New regulations for nuclear facilities have been promulgated since SFR 1 was taken into operation (1988). A review committee comprising employees from SKI and SSI has conducted the review of SSR 2001. This review report has resulted in the committee's evaluation of the safety of SFR 1 and is the basis of the regulatory authorities' decision concerning any amendments to the stipulations for the operation of SFR 1. However, the review has found deficiencies in the follow up of the development of design basis norms since the facility was constructed as well as deficiencies in learning from operating experience. However, the overall evaluation is that the facility is being operated in an acceptable manner from the standpoint of safety. With respect to the long-term performance of the repository, it is a deficiency that SSR 2001 does not describe how compliance with the stipulated radiation protection requirements on optimisation and use of the best available technology (BAT) is achieved during operation. In the opinion of the review committee, issues relating to occupational radiation protection are being handled satisfactorily and the operational releases of radioactive substances are very small. Safety and Radiation Protection after Closure SKB's long-term repository performance assessment contains essential updates and improvements compared with the

  19. Safety of High Speed Magnetic Levitation Transportation Systems: Preliminary Safety Review of the Transrapid Maglev System

    1990-11-01

    The safety of various magnetically levitated trains under development for possible : implementation in the United States is of direct concern to the Federal Railroad : Administration. This report, one in a series of planned reports on maglev safety, ...

  20. SCART guidelines. Reference report for IAEA Safety Culture Assessment Review Team (SCART)

    2008-01-01

    The IAEA Director General stressed the role of safety culture in his concluding remarks at the Meeting of the Contracting Parties to the Convention on Nuclear Safety in 2002: 'As we have learned in other areas, it is not enough simply to have a structure; it is not enough to say that we have the necessary laws and the appropriate regulatory bodies. All these are important, but equally important is that we have in place a safety culture that gives effect to the structure that we have developed. To me, effectiveness and transparency are keys. So, it is an issue which I am pleased to see, you are giving the attention it deserves and we will continue to work with you in clarifying, developing and applying safety culture through our programmes and through our technical cooperation activities.' The concept of safety culture was initially developed by the International Nuclear Safety Advisory Group (INSAG) after the Chernobyl accident in 1986. Since then the IAEA's perspective of safety culture has expanded with time as its recognition of the complexities of the concept developed. Safety culture is considered to be specific organizational culture in all types of organizations with activities that give rise to radiation risks. The aim is to make safety culture strong and sustainable, so that safety becomes a primary focus for all activities in such organizations, even for those, which might not look safety-related at first. SCART (Safety Culture Assessment Review Team) is a safety review service, which reflects the expressed interest of Members States for methods and tools for safety culture assessment. It is a replacement for the earlier service ASCOT (Assessment of Safety Culture in Organizations Team). The IAEA Safety Fundamentals, Requirements and Guides (Safety Standards) are the basis for the SCART Safety Review Service. The reports of INSAG, identifying important current nuclear safety issues, serve also as references during a SCART mission. SCART missions are based

  1. Lithium safety and tolerability in mood disorders: a critical review

    Ivan Aprahamian

    2014-04-01

    Full Text Available Background : Lithium is a first-line treatment for bipolar disorder in all phases, also indicated as add-on drug for unipolar depression and suicide prevention. This study encompasses a broad critical review on the safety and tolerability of lithium for mood disorders. Methods : A computerized search for English written human studies was made in MEDLINE, using the keywords “lithium” and “mood disorders”, starting from July 1993 through July 2013 (n = 416. This initial search aimed to select clinical trials, prospective data, and controlled design studies of lithium treatment for mood disorders reporting adverse effects (n = 36. The final selection yielded 91 studies. Results : The most common general side effects in patients on lithium treatment were thirst, frequent urination, dry mouth, weight gain, fatigue and cognitive complaints. Lithium users showed a high prevalence of hypothyroidism, hyperparathyroidism, and decrease in urinary concentration ability. Reduction of glomerular filtration rate in patients using lithium was also observed, but in a lesser extent. The evidence of teratogenicity associated with lithium use is not well established. Anti-inflammatory non-steroidal drugs, thiazide diuretics, angiotensin-converting enzyme inhibitors, and alprazolam may increase serum lithium and the consequent risk for intoxication. Discussion : Short-term lithium treatment is associated with mild side effects. Medium and long-term lithium treatment, however, might have effects on target organs which may be prevented by periodical monitoring. Overall, lithium is still a safe option for the treatment of mood disorders.

  2. Commercial Crew Program and the Safety Technical Review Board

    Mullen, Macy

    2016-01-01

    The Commercial Crew Program (CCP) is unique to any other program office at NASA. After the agency suffered devastating budget cuts and the Shuttle Program retired, the U.S. gave up its human spaceflight capabilities. Since 2011 the U.S. has been dependent on Russia to transport American astronauts and cargo to the International Space Station (ISS) and back. NASA adapted and formed CCP, which gives private, domestic, aerospace companies unprecedented reign over America's next ride to space. The program began back in 2010 with 5 companies and is now in the final phase of certification with 2 commercial partners. The Commercial Crew Program is made up of 7 divisions, each working rigorously with the commercial providers to complete the certification phase. One of these 7 divisions is Systems Engineering and Integration (SE&I) which is partly comprised of the Safety Technical Review Board (STRB). The STRB is primarily concerned with mitigating improbable, but catastrophic hazards. It does this by identifying, managing, and tracking these hazards in reports. With the STRB being in SE&I, it significantly contributes to the overall certification of the partners' vehicles. After the partners receive agency certification approval, they will have the capability to provide the U.S. with a reliable, safe, and cost-effective means of human spaceflight and cargo transport to the ISS and back.

  3. Review of health safety aspects of nanotechnologies in food production.

    Bouwmeester, Hans; Dekkers, Susan; Noordam, Maryvon Y; Hagens, Werner I; Bulder, Astrid S; de Heer, Cees; ten Voorde, Sandra E C G; Wijnhoven, Susan W P; Marvin, Hans J P; Sips, Adriënne J A M

    2009-02-01

    Due to new, previously unknown, properties attributed to engineered nanoparticles many new products are introduced in the agro-food area. Nanotechnologies cover many aspects, such as disease treatment, food security, new materials for pathogen detection, packaging materials and delivery systems. As with most new and evolving technologies, potential benefits are emphasized, while little is known on safety of the application of nanotechnologies in the agro-food sector. This review gives an overview of scientific issues that need to be addressed with priority in order to improve the risk assessment for nanoparticles in food. The following research topics are considered to contribute pivotally to risk assessment of nanotechnologies and nanoparticles in food products. Set a definition for NPs to facilitate regulatory discussions, prioritization of research and exchange of study results. Develop analytical tools for the characterization of nanoparticles in complex biological matrices like food. Establish relevant dose metrics for nanoparticles used for both interpretation of scientific studies as well as regulatory frameworks. Search for deviant behavior (kinetics) and novel effects (toxicity) of nanoparticles and assess the validity of currently used test systems following oral exposure. Estimate the consumer exposure to nanoparticles.

  4. Review of the Safety Design Approaches in Sodium Fast Reactors

    Suk, Soo Dong; Lee, Yong Bum

    2009-12-01

    The principle of the Defense in depth is essential in securing the safety of nuclear power plants, that is, to prevent cores-damaging severs accidents and to minimize the radiological consequences of the accidents 'as low as possible' (ALARA). One of the major design features of sodium fast reactors (SFRs) is that it has a large amount of sodium in the reactor vessel, providing a large heat capacity, such that it is feasible to contain the consequences of sever core damaging accidents in the vessel and primary system boundary. Containment of a severe accident in the primary system boundary, that is called in-vessel retention(IVR), is not a licensing requirement but set up as a design goal in most of the SFR design in the context of risk minimization. The objective of this report is to broadly review and compare the approaches and efforts made in the some of the major SFR designs of the US, Europe and Japan to prevent severe accidents and mitigate their consequences should they occur. Specifically, the subjects described in this report include design criteria or requirements, accident categorization and acceptance criteria, design features to prevent and contain severs accidents

  5. Factors influencing the microbial safety of fresh produce: a review.

    Olaimat, Amin N; Holley, Richard A

    2012-10-01

    Increased consumption, larger scale production and more efficient distribution of fresh produce over the past two decades have contributed to an increase in the number of illness outbreaks caused by this commodity. Pathogen contamination of fresh produce may originate before or after harvest, but once contaminated produce is difficult to sanitize. The prospect that some pathogens invade the vascular system of plants and establish "sub-clinical" infection needs to be better understood to enable estimation of its influence upon risk of human illness. Conventional surface sanitation methods can reduce the microbial load, but cannot eliminate pathogens if present. Chlorine dioxide, electrolyzed water, UV light, cold atmospheric plasma, hydrogen peroxide, organic acids and acidified sodium chlorite show promise, but irradiation at 1 kGy in high oxygen atmospheres may prove to be the most effective means to assure elimination of both surface and internal contamination of produce by pathogens. Pathogens of greatest current concern are Salmonella (tomatoes, seed sprouts and spices) and Escherichia coli O157:H7 on leafy greens (spinach and lettuce). This review considers new information on illness outbreaks caused by produce, identifies factors which influence their frequency and size and examines intervention effectiveness. Research needed to increase our understanding of the factors influencing microbial safety of fresh produce is addressed. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. The Safety of Ingested Caffeine: A Comprehensive Review

    Jennifer L. Temple

    2017-05-01

    Full Text Available Caffeine is the most widely consumed psychoactive drug in the world. Natural sources of caffeine include coffee, tea, and chocolate. Synthetic caffeine is also added to products to promote arousal, alertness, energy, and elevated mood. Over the past decade, the introduction of new caffeine-containing food products, as well as changes in consumption patterns of the more traditional sources of caffeine, has increased scrutiny by health authorities and regulatory bodies about the overall consumption of caffeine and its potential cumulative effects on behavior and physiology. Of particular concern is the rate of caffeine intake among populations potentially vulnerable to the negative effects of caffeine consumption: pregnant and lactating women, children and adolescents, young adults, and people with underlying heart or other health conditions, such as mental illness. Here, we review the research into the safety and safe doses of ingested caffeine in healthy and in vulnerable populations. We report that, for healthy adults, caffeine consumption is relatively safe, but that for some vulnerable populations, caffeine consumption could be harmful, including impairments in cardiovascular function, sleep, and substance use. We also identified several gaps in the literature on which we based recommendations for the future of caffeine research.

  7. Operational safety review programmes for nuclear power plants. Guidelines for assessment

    2002-01-01

    The IAEA has been offering the Operational Safety Review Team (OSART) programme to provide advice and assistance to Member States in enhancing the operational safety of nuclear power plants (NPPs). Simultaneously, the IAEA has encouraged self-assessment and review by Member States of their own nuclear power plants to continuously improve nuclear safety. Currently, some utilities have been implementing safety review programmes to independently review their own plants. Corporate or national operational safety review programmes may be compliance or performance based. Successful utilities have found that both techniques are necessary to provide assurance that (i) as a minimum the NPP meets specific corporate and legal requirements and (ii) management at the NPP is encouraged to pursue continuous improvement principles. These programmes can bring nuclear safety benefits to the plants and utilities. The IAEA has conducted two pilot missions to assess the effectiveness of the operational review programme. Based on these missions and on the experience gained during OSART missions, this document has been developed to provide guidance on and broaden national/corporate safety review programmes in Member States, and to assist in maximizing their benefits. These guidelines are intended primarily for the IAEA team to conduct assessment of a national/corporate safety review programme. However, this report may also be used by a country or utility to establish its own national/corporate safety review programme. The guidelines may likewise be used for self-assessment or for establishing a baseline when benchmarking other safety review programmes. This report consists of four parts. Section 2 addresses the planning and preparation of an IAEA assessment mission and Sections 3 and 4 deal with specific guidelines for conducting the assessment mission itself

  8. The periodic safety review of nuclear power plants. Practices in OECD countries

    1992-01-01

    This report gives an overview of the regulatory concepts and practices for the periodic safety review of nuclear power plants in OECD countries with nuclear power programmes. The statutory bases for such reviews, their objectives and the processes adopted are summarised against the background of each country's regulatory practices. Although periodic safety reviews are now, or will soon be, part of the regulatory process in the majority of countries, the national approaches to these reviews still differ considerably. This report includes numerous examples of the different concepts and practices in OECD countries, thereby illustrating the variety of ways adopted to reach the common goal of maintaining and improving nuclear safety

  9. Safety assessment of Olkiluoto NPP units 1 and 2. Decision of the Radiation and Nuclear Safety Authority regarding the periodic safety review of the Olkiluoto NPP

    2010-02-01

    In this safety assessment the Radiation and Nuclear Safety Authority (STUK) has evaluated the safety of the Olkiluoto Nuclear Power Plant units 1 and 2 in connection with the periodic safety review. This safety assessment provides a summary of the reviews, inspections and continuous oversight carried out by STUK. The issues addressed in the assessment and the related evaluation criteria are set forth in the nuclear energy and radiation safety legislation and the regulations issued thereunder. The provisions of the Nuclear Energy Act concerning the safe use of nuclear energy, security and emergency preparedness arrangements, and waste management are specified in more detail in the Government Decrees and Regulatory Guides issued by STUK. Based on the assessment, STUK consideres that the Olkiluoto Nuclear Power Plant units 1 and 2 meet the set safety requirements for operational nuclear power plants, the emergency preparedness arrangements are sufficient and the necessary control to prevent the proliferation of nuclear weapons has been appropriately arranged. The physical protection of the Olkiluoto nuclear power plant is not yet completely in compliance with the requirements of Government Decree 734/2008, which came into force in December 2008. Further requirements concerning this issue based also on the principle of continuous improvement were included in the decision relating to the periodic safety review. The safety of the Olkiluoto nuclear power plant was assessed in compliance with the Government Decree on the Safety of Nuclear Power Plants (733/2008), which came into force in 2008. The decree notes that existing nuclear power plants need not meet all the requirements set out for new plants. Most of the design bases pertaining to the Olkiluoto 1 and 2 nuclear power plant units were set in the 1970s. Substantial modernisations have been carried out at the Olkiluoto 1 and 2 nuclear power plant units since their commissioning to improve safety. This is in line with

  10. Institutionalization of safety re-assessment system for operating nuclear power plants

    Kim, H. J.; Cho, J. C.; Min, B. K.; Park, J. S.; Jung, H. D.; Oh, K. M.; Kim, W. K.; Lim, J. H.

    1999-01-01

    In this study, in-depth reviews of the foreign countries' experiences and practices in applications of the periodic safety review (PSR), backfitting and license renewal systems as well as the current status of nuclear power safety assurance programs and activities in Korea have been performed to investigate the necessity and feasibility of the application of the systems for the domestic operating nuclear power plants and to establish effective strategy and methodology for the institutionalization of a periodic safety re-assessment system appropriate to both the domestic and international nuclear power environments by incorporating the PSR with the backfitting and license renewal systems. For these purposes, the regulatory policy, fundamental principles and detailed requirements for the institutionalization of the safety re-assessment system and the effective measures for active implementation of the backfitting program have been developed and then a comparative study of benefits and shortcomings has been conducted for the three different models of the periodic safety re-assessment system incorporated with either the license renewal or life extension process, which have been considered as practicable ones in the domestic situation. The model chosen in this study as the most appropriate safety re-assessment system is the one that the re-assessments are performed at the interval of ten years throughout the service life of nuclear power plant and the ten-year license renewal or life extension after the expiration of design life can be permitted based on the regulatory review of the re-assessment results and follow-up measures. Finally, this paper has discussed on the details of the requirements, approach and procedures established for the institutionalization of the periodic safety re-assessment system chosen as the most appropriate one for domestic applications

  11. A review of the safety of cold pasteurization through irradiation

    Crawford, L.M.; Ruff, E.H.

    1996-01-01

    Perhaps no food process has been researched and reviewed more than food irradiation. The scientific basis and mechanisms of food irradiation are as thoroughly understood by the scientific community and regulatory agencies as traditional food processes. While irradiation provides many benefits, it cannot replace proper food handling as the single most critical food safety measure. Irradiation does not prevent contamination but it controls it.A broad spectrum of national and international studies conclude that food irradiation can accomplish the following:* inhibit sprouting in crops like potatoes, onions and garlic;* destroy insects and parasites in cereal grains, dried beans, dried and fresh fruits, meat and seafood;* delay the ripening and spoilage of fresh fruits and vegetables;* extend the shelf-life of perishable products like beef, poultry and seafood;* eliminate disease-causing microorganisms in food; bacterial and fungal spores and viruses are not affected by the most commonly used dose levels; and* sterilize at doses above 10 kGy herbs, spices and other ingredients like dried vegetables, in addition to foods prescribed for immuno-compromised hospital patients and for astronauts during space flight.Scientific research has also determined that food irradiation does not make food 'radioactive' and at low to medium doses, has little negative effect on vitamins and other nutrients humans obtain from their food supply. In cases where the level of certain vitamins are reduced, similar losses are experienced with other processing treatments such as thermal heat and canning. However, irradiation cannot destroy toxins.Scientists have also studied the creation of radiolytic products, including 'free radicals', by food irradiation. There is broad agreement among world renowned researchers, health organizations and agencies that radiolytic products formed during irradiation pose no danger to humans. This conclusion is based upon hundreds of toxicological studies, some

  12. Review process of PSA level 2 of KBR - Concept and Experience

    Andernacht, M.; Glaser, H.; Sonnenkalb, M.

    2013-01-01

    In Germany, a periodic safety review (PSR) has to be performed every ten years by the utility. In the past, a PSR only included a plant-specific probabilistic safety analysis (PSA) Level 1 study. Since a revised version of the German PSA guideline has been released in 2005, these plant-specific PSAs have to include a PSA Level 2, too. For the NPP Brokdorf (KBR) PSA Level 2 project, an agreement was reached between all parties involved that the study will be performed not as a part of the PSR process, but supplementary to it. This paper will focus on conclusions and findings from an ongoing parallel review process of the first full scope PSA Level 2 performed by the utility for KBR, a typical German PWR-1300. The responsible authority 'Ministerium fuer Soziales, Gesundheit, Familie, Jugend und Senioren des Landes Schleswig- Holstein' (MSGF) initiated this parallel review process in agreement with the utility KBR and the E.ON Kernkraft in 2006. The project will be completed soon. Such a review process allows that essential steps of the PSA will be reviewed and commented before the PSA Level 2 will be finished. So the benefit from this parallel review process is a significant enhancement of the quality and completeness of the PSA Level 2 study as the majority of the recommendations given by the review team has been taken over by the utility and the developer of the PSA, the AREVA NP company. Further, a common understanding and agreement will be reached at the end between all parties involved on the major topics of the PSA Level 2 study. The paper is followed by the slides of the presentation. (authors)

  13. Review process of PSA Level 2 of KBR. Concept and experience

    Andernacht, Martin; Glaser, Hendrik; Sonnenkalb, Martin

    2009-01-01

    In Germany, a periodic safety review (PSR) has to be performed every 10 years by the utility. In the past, a PSR only included a plant-specific probabilistic safety analysis (PSA) Level 1 study. For the NPP Brokdorf (KBR) PSA Level 2 project, an agreement was reached between all parties involved that the study will be performed not as a part of the PSR process, but supplementary to it. Since a revised version of the German PSA guideline has been released in 2005, these plant-specific PSAs have to include a PSA Level 2, too. This paper will focus on conclusions and findings from a ongoing parallel review process of the first full scope PSA Level 2 performed by the utility for KBR, a typical German PWR-1300. The responsible authority 'Ministerium fuer Soziales, Gesundheit, Familie, Jugend und Senioren des Landes Schleswig-Holstein (MSGF)' (Ministry of Social Affairs, Health, Family, Youth and Senior Citizens of Schleswig-Holstein) initiated this parallel review process in agreement with the utility KBR and the E.ON Kernkraft in 2006. The project will be completed soon. Such a review process allows that essential steps of the PSA will be reviewed and commented before the PSA Level 2 will be finished. So the benefit from this parallel review process is a significant enhancement of the quality and completeness of the PSA Level 2 study as the majority of the recommendations given by the review team has been taken over by the utility and the developer of the PSA, the Areva NP company. Further, a common understanding and agreement will be reached at the end between all parties involved on the major topics of the PSA Level 2 study. (orig.)

  14. Review of Policy Documents for Nuclear Safety and Regulation

    Kim, Woong Sik; Choi, Kwang Sik; Choi, Young Sung; Kim, Hho Jung; Kim, Ho Ki

    2006-01-01

    The goal of regulation is to protect public health and safety as well as environment from radiological hazards that may occur as a result of the use of atomic energy. In September 1994, the Korean government issued the Nuclear Safety Policy Statement (NSPS) to establish policy goals of maintaining and achieving high-level of nuclear safety and also help the public understand the national policy and a strong will of the government toward nuclear safety. It declares the importance of establishing safety culture in nuclear community and also specifies five nuclear regulatory principles (Independence, Openness, Clarity, Efficiency and Reliability) and provides the eleven regulatory policy directions. In 2001, the Nuclear Safety Charter was declared to make the highest goal of safety in driving nuclear business clearer; to encourage atomic energy- related institutions and workers to keep in mind the mission and responsibility for assuring safety; to guarantee public confidence in related organizations. The Ministry of Science and Technology (MOST) also issues Yearly Regulatory Policy Directions at the beginning of every year. Recently, the third Atomic Energy Promotion Plan (2007-2011) has been established. It becomes necessary for the relevant organizations to prepare the detailed plans on such areas as nuclear development, safety management, regulation, etc. This paper introduces a multi-level structure of nuclear safety and regulation policy documents in Korea and presents some improvements necessary for better application of the policies

  15. Review of Policy Documents for Nuclear Safety and Regulation

    Kim, Woong Sik; Choi, Kwang Sik; Choi, Young Sung; Kim, Hho Jung; Kim, Ho Ki [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of)

    2006-07-01

    The goal of regulation is to protect public health and safety as well as environment from radiological hazards that may occur as a result of the use of atomic energy. In September 1994, the Korean government issued the Nuclear Safety Policy Statement (NSPS) to establish policy goals of maintaining and achieving high-level of nuclear safety and also help the public understand the national policy and a strong will of the government toward nuclear safety. It declares the importance of establishing safety culture in nuclear community and also specifies five nuclear regulatory principles (Independence, Openness, Clarity, Efficiency and Reliability) and provides the eleven regulatory policy directions. In 2001, the Nuclear Safety Charter was declared to make the highest goal of safety in driving nuclear business clearer; to encourage atomic energy- related institutions and workers to keep in mind the mission and responsibility for assuring safety; to guarantee public confidence in related organizations. The Ministry of Science and Technology (MOST) also issues Yearly Regulatory Policy Directions at the beginning of every year. Recently, the third Atomic Energy Promotion Plan (2007-2011) has been established. It becomes necessary for the relevant organizations to prepare the detailed plans on such areas as nuclear development, safety management, regulation, etc. This paper introduces a multi-level structure of nuclear safety and regulation policy documents in Korea and presents some improvements necessary for better application of the policies.

  16. SRTC criticality safety technical review: Nuclear criticality safety evaluation 94-02, uranium solidification facility pencil tank module spacing

    Rathbun, R.

    1994-01-01

    Review of NMP-NCS-94-0087, ''Nuclear Criticality Safety Evaluation 94-02: Uranium Solidification Facility Pencil Tank Module Spacing (U), April 18, 1994,'' was requested of the SRTC Applied Physics Group. The NCSE is a criticality assessment to show that the USF process module spacing, as given in Non-Conformance Report SHM-0045, remains safe for operation. The NCSE under review concludes that the module spacing as given in Non-Conformance Report SHM-0045 remains in a critically safe configuration for all normal and single credible abnormal conditions. After a thorough review of the NCSE, this reviewer agrees with that conclusion

  17. Safety impacts of bicycle infrastructure: A critical review.

    DiGioia, Jonathan; Watkins, Kari Edison; Xu, Yanzhi; Rodgers, Michael; Guensler, Randall

    2017-06-01

    This paper takes a critical look at the present state of bicycle infrastructure treatment safety research, highlighting data needs. Safety literature relating to 22 bicycle treatments is examined, including findings, study methodologies, and data sources used in the studies. Some preliminary conclusions related to research efficacy are drawn from the available data and findings in the research. While the current body of bicycle safety literature points toward some defensible conclusions regarding the safety and effectiveness of certain bicycle treatments, such as bike lanes and removal of on-street parking, the vast majority treatments are still in need of rigorous research. Fundamental questions arise regarding appropriate exposure measures, crash measures, and crash data sources. This research will aid transportation departments with regard to decisions about bicycle infrastructure and guide future research efforts toward understanding safety impacts of bicycle infrastructure. Copyright © 2017 Elsevier Ltd and National Safety Council. All rights reserved.

  18. Nuclear Safety: Technical progress review, January-March 1988

    Silver, E G [ed.

    1988-01-01

    This journal covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  19. OSART Guidelines. 2015 Edition. Reference Report for IAEA Operational Safety Review Teams (OSARTs)

    2016-01-01

    The IAEA works to provide a global nuclear safety and security framework for the protection of people and the environment from the effects of ionizing radiation, the minimization of the likelihood of accidents that could endanger life and property, and effective mitigation of the effects of any such events, should they occur. The strategic approach to achieving such a framework involves continual improvement in four areas: national and international safety infrastructures; the establishment and global acceptance of IAEA safety standards; an integrated approach to the provision for the application of the safety standards; and a global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. Conservative design, careful manufacture and sound construction are all prerequisites for the safe operation of nuclear power plants. However, the safety of the plant also depends ultimately on: sound management, policies, procedures, processes and practices; the capability and reliability of commissioning and operating personnel; comprehensive instructions; sound accident management and emergency preparedness; and adequate resources. Finally, a positive attitude and conscientiousness on the part of all staff in discharging their responsibilities is important to safety. The OSART programme is based on the safety standards applicable to nuclear power plants. IAEA safety standards reflect the consensus of Member States on nuclear safety matters. The reports of the International Nuclear Safety Group identify important current nuclear safety issues and also serve as references during an OSART review. The publication OSART Guidelines provides overall guidance on the conduct of OSART

  20. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in FY 2008

    2012-09-30

    In FY 2008, Federal and State enforcement personnel conducted 14,906 compliance reviews (CRs) on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers...

  1. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in fiscal year 2009.

    2014-04-01

    In FY 2009, Federal and State enforcement personnel conducted more than 15,000 compliance reviews (CRs) on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR...

  2. A critical review on toxicological safety of 2-alkylcyclobutanones

    Song, Beom-Seok; Choi, Soo-Jeong; Jin, Young-Bae; Park, Jong-Heum; Kim, Jae-Kyung; Byun, Eui-Baek; Kim, Jae-Hun; Lee, Ju-Woon; Kim, Gang-Sung; Marchioni, Eric

    2014-01-01

    2-Alkylcyclobutanones (2-ACBs) are known as unique radiolytic products generated from the major fatty acids and triglycerides in food through only irradiation. Since 1990, studies on the toxicological safety of 2-ACBs have been conducted extensively with synthetic compounds. Mutagenicity tests of 2-ACBs on the microorganisms reviewed in this study clearly indicate that no evidence was observed, while several in vitro studies demonstrated the cytotoxicity of 2-ACBs through cell death. Moreover, the genotoxicity of 2-ACBs was suggested as DNA strand breaks were observed. However, these findings should be interpreted with caution because genotoxicity may result from cytotoxicity, which causes DNA damage or from cell membrane destruction and indirect oxidative DNA damage. Therefore, elucidation of the mechanism of genotoxic effects is needed. With regards to the suggestion of Raul et al. (2002) who showed the promoting effect of colon cancer by the administration of 2-ACBs, further studies are needed to correct some experimental design errors. Moreover, an in-vivo experiment that evaluated the metabolism of 2-ACBs has revealed that 2-dDCB was metabolized into cyclic alcohol and excreted through fecal discharge. In conclusion, it is considered that the ingestion of 2-ACBs through irradiated foods is unlikely to affect the human health. However, more specific studies are required to identify the fate of 2-ACBs in body and the LD 50 values. The determination of chronic toxicity by long-term exposure to low concentrations of 2-ACBs has to be evaluated more clearly to determine if these compounds are safe to human. - Highlights: • Mutagenicity 2-ACBs on the microorganisms was not observed. • Several in vitro studies demonstrated the cytotoxicity of 2-ACBs. • Genotoxicity of 2-ACBs was suggested, but elucidation of the mechanism is needed. • 2-dDCB was metabolized into cyclic alcohol and excreted in feces. • Further studies for toxicity of 2-ACBs following

  3. Radiation safety, protection and recommendations in dentistry - a review

    Castelino, Renita

    2013-01-01

    Radiation is the transmission of energy through space and matter. Diagnostic radiology uses ionizing radiations which have sufficient energy to ionize atoms or molecules in biological and other systems. X-rays used in diagnostic radiology are a potent mutagenic agent, capable of inducing both gene mutations and chromosomal aberrations. X-rays are extensively used in medical and dental practice for the purpose of diagnosis and treatment. X-rays provide useful information and aid in diagnosis but at the same time they also have the potential to cause harmful effects. In dentistry X-rays are used mainly for diagnosis. Radiation in doses required for dentistry may not present any major risks, however these small doses are not necessarily risk free. Hence, no exposure to X-rays can be considered completely free of risk, so the use of radiation by dentists is accompanied by a responsibility to ensure appropriate protection. Several radiation safety measures have been recommended and advocated to reduce harmful effects. Dental professionals are the only practitioners who perform radiographical examination of their patients themselves. Although the exposure used in dentistry is low every effort should be made to reduce radiation in order to prevent the accumulated dose to the dentist in their lifetime. The dose reduction can be achieved in three main steps. They are decision making, optimising radiologic procedures and patient protection. The potential for undesirable effects must be balanced against the benefits obtained from radiographs. Therefore, the aim of the paper is to review important parameters that must be taken into consideration in the clinical set up to reduce radiation exposure to patients and dental personnel. (author)

  4. Evaluation and review of the safety management system implementation in the Royal Thai Air Force

    Chaiwan, Sakkarin

    This study was designed to determine situation and effectiveness of the safety management system currently implemented in the Royal Thai Air Force. Reviewing the ICAO's SMS and the RTAF's SMS was conducted to identify similarities and differences between the two safety management systems. Later, the researcher acquired safety statistics from the RTAF Safety Center to investigate effectiveness of its safety system. The researcher also collected data to identify other factors affecting effectiveness of the safety system during conducting in-depth interviews. Findings and Conclusions: The study shows that the Royal Thai Air Force has never applied the International Civil Aviation Organization's Safety management System to its safety system. However, the RTAF's SMS and the ICAO's SMS have been developed based on the same concepts. These concepts are from Richard H. Woods's book, Aviation safety programs: A management handbook. However, the effectiveness of the Royal Thai Air Force's safety system is in good stance. An accident rate has been decreasing regularly but there are no known factors to describe the increasing rate, according to the participants' opinion. The participants have informed that there are many issues to be resolved to improve the RTAF's safety system. Those issues are cooperation among safety center's staffs, attitude toward safety of the RTAF senior commanders, and safety standards.

  5. Building safety and human behaviour in fire: A literature review

    Kobes, M.; Helsloot, I.; de Vries, B.; Post, J.

    2010-01-01

    The most crucial aspect of a building's safety in the face of fire is the possibility of safe escape. An important precondition is that its fire safety facilities enable independent and adequate fire response performances by the building's occupants. In practice, it appears that the measures

  6. Review of safety reports involving electronic flight bags

    2009-04-27

    Electronic Flight Bags (EFBs) are a relatively new device used by pilots. Even so, 37 safety-related events involving EFBs were identified from the public online Aviation Safety Reporting System (ASRS) database as of June 2008. In addition, two accid...

  7. Improving Patient Safety Culture in Primary Care: A Systematic Review

    Verbakel, Natasha J.; Langelaan, Maaike; Verheij, Theo J. M.; Wagner, Cordula; Zwart, Dorien L. M.

    Background: Patient safety culture, described as shared values, attitudes and behavior of staff in a health-care organization, gained attention as a subject of study as it is believed to be related to the impact of patient safety improvements. However, in primary care, it is yet unknown, which

  8. Guidelines for the Review of Research Reactor Safety: Revised Edition. Reference Document for IAEA Integrated Safety Assessment of Research Reactors (INSARR)

    2013-01-01

    The Integrated Safety Assessment of Research Reactors (INSARR) is an IAEA safety review service available to Member States with the objective of supporting them in ensuring and enhancing the safety of their research reactors. This service consists of performing a comprehensive peer review and an assessment of the safety of the respective research reactor. The reviews are based on IAEA safety standards and on the provisions of the Code of Conduct on the Safety of Research Reactors. The INSARR can benefit both the operating organizations and the regulatory bodies of the requesting Member States, and can include new research reactors under design or operating research reactors, including those which are under a Project and Supply Agreement with the IAEA. The first IAEA safety evaluation of a research reactor operated by a Member State was completed in October 1959 and involved the Swiss 20 MW DIORIT research reactor. Since then, and in accordance with its programme on research reactor safety, the IAEA has conducted safety review missions in its Member States to enhance the safety of their research reactor facilities through the application of the Code of Conduct on the Safety of Research Reactors and the relevant IAEA safety standards. About 320 missions in 51 Member States were undertaken between 1972 and 2012. The INSARR missions and other limited scope safety review missions are conducted following the guidelines presented in this publication, which is a revision of Guidelines for the Review of Research Reactor Safety (IAEA Services Series No. 1), published in December 1997. This publication details those IAEA safety standards and guidance publications relevant to the safety of research reactors that have been revised or published since 1997. The purpose of this publication is to give guidance on the preparation, implementation, reporting and follow-up of safety review missions. It is also intended to be of assistance to operators and regulators in conducting

  9. Patient safety culture in care homes for older people: a scoping review

    Emily Gartshore

    2017-11-01

    Full Text Available Abstract Background In recent years, there has been an increasing focus on the role of safety culture in preventing incidents such as medication errors and falls. However, research and developments in safety culture has predominantly taken place in hospital settings, with relatively less attention given to establishing a safety culture in care homes. Despite safety culture being accepted as an important quality indicator across all health and social care settings, the understanding of culture within social care settings remains far less developed than within hospitals. It is therefore important that the existing evidence base is gathered and reviewed in order to understand safety culture in care homes. Methods A scoping review was undertaken to describe the availability of evidence related to care homes’ patient safety culture, what these studies focused on, and identify any knowledge gaps within the existing literature. Included papers were each reviewed by two authors for eligibility and to draw out information relevant to the scoping review. Results Twenty-four empirical papers and one literature review were included within the scoping review. The collective evidence demonstrated that safety culture research is largely based in the USA, within Nursing Homes rather than Residential Home settings. Moreover, the scoping review revealed that empirical evidence has predominantly used quantitative measures, and therefore the deeper levels of culture have not been captured in the evidence base. Conclusions Safety culture in care homes is a topic that has not been extensively researched. The review highlights a number of key gaps in the evidence base, which future research into safety culture in care home should attempt to address.

  10. Results of 6th Review Meeting and Perspective of the 7th Review Meeting of the Convention on Nuclear Safety

    Lee, Sukho; Kim, Manwoong; You, Jeongwon; Lee, Youngeal

    2017-01-01

    This paper highlighted the objective and role of the Convention on Nuclear Safety organized by the IAEA. The Convention provides Member States to demonstrate and share how to maintain and improve the level of nuclear safety. The results of the 6 th review meeting were implemented for safety improvements and to prepare for 7 th national report. Seven and a half months before the 7 th Review Meeting, the National Report has submitted on steps and measures taken to implement Convention obligations. The Contracting Parties reviewed each other’s reports, and exchanged written questions, written answers and comments. The discussions in the Country Group sessions were generally good with a lively and frank exchange of information. The Country Groups noted the significant measures taken by Contracting Parties to improve nuclear safety and identified a number of good practices to be shared with all Contracting Parties.

  11. An integrative review of patient safety in studies on the care and safety of patients with communication disabilities in hospital.

    Hemsley, Bronwyn; Georgiou, Andrew; Hill, Sophie; Rollo, Megan; Steel, Joanne; Balandin, Susan

    2016-04-01

    To review the research literature on the experiences of patients with communication disabilities in hospital according to the Generic Model of patient safety. In 2014 and 2015, we searched four scientific databases for studies with an aim or result relevant to safety of hospital patients with communication disabilities. The review included 27 studies. A range of adverse event types were outlined in qualitative research. Little detail was provided about contributing or protective factors for safety incidents in hospital for these patients or the impact of the incidents on the patient or organisations involved. Further research addressing the safety of patients with communication disabilities is needed. Sufficient detail is required to identify the nature, timing, and detection of incidents; factors that contribute to or prevent adverse events; and detail the impact of the adverse events. In order to provide safe and effective care to people with communication disabilities in hospital, a priority for health and disability services must be the design and evaluation of ecologically appropriate and evidence-based interventions to improve patient care, communication, and reduce the risk of costly and harmful patient safety incidents. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  12. Review of radiation safety in the cardiac catheterization laboratory

    Johnson, L.W.; Moore, R.J.; Balter, S.

    1992-01-01

    With the increasing use of coronary arteriography and interventional procedures, radiation exposure to patients and personnel working in cardiac catheterization laboratories has increased. Proper technique to minimize both patient and operator exposure is necessary. A practical approach to radiation safety in the cardiac catheterization laboratory is presented. This discussion should be useful to facilities with well-established radiation safety programs as well as facilities that require restructuring to cope with the radiation environment in a modern cardiac catheterization laboratory

  13. Standard Review Plan for the review of safety analysis reports for nuclear power plants, Revision No. 7 to Section 9

    1978-03-01

    Revision No. 1 to Section 9 of the Standard Review Plan incorporates changes that have been developed since the original issuance in September 1975, many of which are editorial in nature, to reflect current staff practice in the review of safety analysis reports for nuclear power plants

  14. Safety

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. These activities are reported under the headings: (1) Nuclear safety; (2) Industrial and health safety; (3) Radiation safety; and Fire protection

  15. Preparation, review, and approval of implementation plans for nuclear safety requirements

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  16. 41 CFR 128-1.8009 - Review of Seismic Safety Program.

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Review of Seismic Safety Program. 128-1.8009 Section 128-1.8009 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF JUSTICE 1-INTRODUCTION 1.80-Seismic Safety Program...

  17. A Review of Interventions To Increase Driving Safety among Teenage Drivers.

    Mattox, John R., II

    Young drivers across the United States represent a persistent traffic safety problem. Many interventions have been imposed on these drivers but few studies have evaluated the impact of these interventions on risky behaviors or traffic safety measures. To fill this gap, a review was undertaken to examine the most rigorous methodological evaluations…

  18. Research oil guidelines for safety review of category 2 waste disposal

    NONE

    2013-08-15

    Safety confirmation items and monitoring items for engineered barriers were compiled, considering the current technical status and monitoring plan for the simulated subsurface disposal and its test facilities. In order to develop the guidelines of the safety review for the disposal of LLW generated from RI facilities and research facilities, technical issues relating toxic substances were surveyed. (author)

  19. Response to NII review of the PCSR July 1982 - protection and essential safety systems

    Burton, R.J.

    1982-12-01

    The design provisions of the systems are summarised, and response is made to the detailed concerns of the Nuclear Installations Inspectorate as expressed in their review of the pre-construction safety report (PCSR). Further clarification is provided of work done on protection and essential safety systems since presentation of the PCSR, and the ongoing work programme is described. (U.K.)

  20. 75 FR 42818 - Agency Information Collection; Activity Under OMB Review; Collection of Safety Culture Data for...

    2010-07-22

    ... Collection; Activity Under OMB Review; Collection of Safety Culture Data for Program Evaluation AGENCY... . SUPPLEMENTARY INFORMATION: Title: Collection of Safety Culture Data for Program Evaluation. Type of Request... data on the nation's transportation system is an important component of BTS' responsibility to the...

  1. Efficacy and safety of pregabalin in generalised anxiety disorder : A critical review of the literature

    Baldwin, David S.; den Boer, Johan A.; Lyndon, Gavin; Emir, Birol; Schweizer, Edward; Haswell, Hannah

    2015-01-01

    The aim of this review is to summarise the literature on the efficacy and safety of pregabalin for the treatment of generalised anxiety disorder (GAD). Of 241 literature citations, 13 clinical trials were identified that were specifically designed to evaluate the efficacy and safety of pregabalin in

  2. Fermi LAT Detection of Pulsed Gamma-Rays From the Vela-Like Pulsars PSR J1048-5832 and PSR J2229+6114

    Abdo, A.A.; /Naval Research Lab, Wash., D.C. /Federal City Coll.; Ackermann, M.; /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept.; Ajello, M.; /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept.; Atwood, W.B.; /UC, Santa Cruz; Axelsson, M.; /Stockholm U. /Stockholm U., OKC; Baldini, L.; /INFN, Pisa; Ballet, J.; /DAPNIA, Saclay; Barbiellini, G.; /INFN, Trieste /Trieste U.; Baring, M.G.; /Rice U.; Bastieri, D.; /INFN, Padua /Padua U.; Baughman, B.M.; /Ohio State U.; Bechtol, K.; /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept.; Bellazzini, R.; /INFN, Pisa; Berenji, B.; /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept.; Bloom, E.D.; /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept.; Bonamente, E.; /INFN, Perugia /Perugia U.; Borgland, A.W.; /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept.; Bregeon, J.; /INFN, Pisa; Brez, A.; /INFN, Pisa; Brigida, M.; /Bari U. /INFN, Bari; Bruel, P.; /Ecole Polytechnique /Bari U. /INFN, Bari /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept. /Columbia U. /IASF, Milan /Milan Polytechnic /DAPNIA, Saclay /INFN, Perugia /Perugia U. /Naval Research Lab, Wash., D.C. /George Mason U. /NASA, Goddard /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept. /INFN, Perugia /Perugia U. /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept. /LPCE, Orleans /Montpellier U. /Stockholm U. /Stockholm U., OKC /INFN, Trieste /Bari U. /INFN, Bari /UC, Santa Cruz /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept. /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept. /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept. /CENBG, Gradignan /CENBG, Gradignan /Montpellier U. /Bari U. /INFN, Bari /INFN, Trieste /Arecibo Observ. /Hiroshima U. /Stanford U., HEPL /KIPAC, Menlo Park /Stanford U., Phys. Dept. /Bari U. /INFN, Bari /INFN, Bari /NASA, Goddard /Maryland U. /INFN, Perugia /Perugia U.; /more authors..

    2012-03-29

    We report the detection of {gamma}-ray pulsations ({ge}0.1 GeV) from PSR J2229+6114 and PSR J1048-5832, the latter having been detected as a low-significance pulsar by EGRET. Data in the {gamma}-ray band were acquired by the Large Area Telescope (LAT) aboard the Fermi Gamma-ray Space Telescope, while the radio rotational ephemerides used to fold the {gamma}-ray light curves were obtained using the Green Bank Telescope, the Lovell telescope at Jodrell Bank, and the Parkes Telescope. The two young radio pulsars, located within the error circles of the previously unidentified EGRET sources 3EG J1048-5840 and 3EG J2227+6122, present spin-down characteristics similar to the Vela pulsar. PSR J1048-5832 shows two sharp peaks at phases 0.15 {+-} 0.01 and 0.57 {+-} 0.01 relative to the radio pulse confirming the EGRET light curve, while PSR J2229+6114 presents a very broad peak at phase 0.49 {+-} 0.01. The {gamma}-ray spectra above 0.1 GeV of both pulsars are fit with power laws having exponential cutoffs near 3 GeV, leading to integral photon fluxes of (2.19 {+-} 0.22 {+-} 0.32) x 10{sup -7} cm{sup -2} s{sup -1} for PSR J1048-5832 and (3.77 {+-} 0.22 {+-} 0.44) x 10{sup -7} cm{sup -2} s{sup -1} for PSR J2229+6114. The first uncertainty is statistical and the second is systematic. PSR J1048-5832 is one of the two LAT sources which were entangled together as 3EG J1048-5840. These detections add to the growing number of young {gamma}-ray pulsars that make up the dominant population of GeV {gamma}-ray sources in the Galactic plane.

  3. A VERY LARGE GLITCH IN PSR B2334+61

    Yuan, J. P.; Wang, N.; Zhou, X.; Liu, Z. Y.; Gao, Z. F.; Manchester, R. N.

    2010-01-01

    Seven year pulse time-of-arrival measurements have been collected from observations of the young pulsar PSR B2334+61 using the Nanshan radio telescope of Urumqi Observatory. A phase-connected solution has been obtained over the whole data span, 2002 August to 2009 August. This includes a very large glitch that occurred between 2005 August 26 and September 8 (MJDs 53608 and 53621). The relative increase in rotational frequency for this glitch, Δν g /ν ∼ 20.5 x 10 -6 , is the largest ever seen. Although accounting for less than 1% of the glitch, there were two well-defined exponential decay terms with time constants of 21 and 147 days, respectively. There was also a large long-term increase in the spin-down rate with Δν-dit p /ν-dot ∼0.011 at the time of the glitch. A highly significant oscillation with a period of close to one year is seen in the post-glitch residuals. It is very unlikely that this can be accounted for by a pulsar position error or proper motion-it appears to result from effects interior to the neutron star. Implications of these results for pulsar glitch models are discussed.

  4. New Acquisition System for the PSR Beam Pulse Charge Monitor

    Sellyey, William C.; Lewis, Paul S.

    2004-01-01

    A Pearson 1010 current monitor toroid has been in use for many years to measure the charge per bunch being delivered from the LANSCE Proton Storage Ring (PSR) to the Lujan Center's spallation neutron source. Improved electronics have been developed to process the toroid's signal. The new system generates a calibrated measurement of charge per pulse and is network-enabled to provide remote access to charge, current and other data via EPICS. It is experimentally demonstrated that accurate charge measurements can be made on calibration pulses that contain frequency components well above what is contained in a typical beam pulse. The new electronics consists of a National Instruments (NI) PXI-1002 chassis that contains a PXI-8176 controller, a PXI-5112 100-MS/s digitizer, and a PXI-6602 scalar and digital I/O module. The 8176 runs under the NI Real Time operating system and was programmed to integrate proton pulse waveforms acquired by the 5112 digitizer. For each beam pulse a 50-kHz pulse stream proportional to the pulse charge is generated by the 6602 and this real time information is distributed to all experimental areas

  5. Multiwavelength Spectroscopy of PSR B0656+14

    Durant, Martin; Kargaltsev, Oleg; Pavlov, George G.

    2011-12-01

    Using high-quality Hubble Space Telescope observations, we construct the near-infrared (NIR) to far-ultraviolet (FUV) spectral energy distribution (SED) of PSR B0656+14. The SED is non-monotonic. Fitting it with a simple combination of a Rayleigh-Jeans spectrum (UV) and non-thermal power law (PL; optical/NIR) leaves significant residuals, strongly hinting at one or more spectral features. We consider various models (combination of continuum components, and absorption/emission lines) with possible interpretations and place them in the context of the broader SED. Surprisingly, the extrapolation of the best-fit X-ray spectral model roughly matches the NIR-FUV data, and the PL component is also consistent with the γ-ray fluxes. We compare the multiwavelength SED of B0656+14 with those of other optical-, X-ray-, and γ-ray-detected pulsars, and notice that a simple PL spectrum crudely accounts for most of the non-thermal emission.

  6. MULTIWAVELENGTH SPECTROSCOPY OF PSR B0656+14

    Durant, Martin; Kargaltsev, Oleg; Pavlov, George G.

    2011-01-01

    Using high-quality Hubble Space Telescope observations, we construct the near-infrared (NIR) to far-ultraviolet (FUV) spectral energy distribution (SED) of PSR B0656+14. The SED is non-monotonic. Fitting it with a simple combination of a Rayleigh-Jeans spectrum (UV) and non-thermal power law (PL; optical/NIR) leaves significant residuals, strongly hinting at one or more spectral features. We consider various models (combination of continuum components, and absorption/emission lines) with possible interpretations and place them in the context of the broader SED. Surprisingly, the extrapolation of the best-fit X-ray spectral model roughly matches the NIR-FUV data, and the PL component is also consistent with the γ-ray fluxes. We compare the multiwavelength SED of B0656+14 with those of other optical-, X-ray-, and γ-ray-detected pulsars, and notice that a simple PL spectrum crudely accounts for most of the non-thermal emission.

  7. Timing irregularities of PSR J1705-1906

    Liu, Y. L.; Yuan, J. P.; Wang, J. B.; Liu, X. W.; Wang, N.; Yuen, R.

    2018-05-01

    Timing analysis of PSR J1705-1906 using data from Nanshan 25-m and Parkes 64-m radio telescopes, which span over fourteen years, shows that the pulsar exhibits significant proper motion, and rotation instability. We updated the astrometry parameters and the spin parameters of the pulsar. In order to minimize the effect of timing irregularities on measuring its position, we employ the Cholesky method to analyse the timing noise. We obtain the proper motion of -77(3) mas yr-1 in right ascension and -38(29) mas yr-1 in declination. The power spectrum of timing noise is analyzed for the first time, which gives the spectral exponent α =-5.2 for the power-law model indicating that the fluctuations in spin frequency and spin-down rate dominate the red noise. We detect two small glitches from this pulsar with fractional jump in spin frequency of Δ ν /ν ˜ 2.9 × 10^{-10} around MJD 55199 and Δ ν /ν ˜ 2.7× 10^{-10} around MJD 55953. Investigations of pulse profile at different time segments suggest no significant changes in the pulse profiles around the two glitches.

  8. The binary nature of PSR J2032+4127

    Lyne, A. G.; Stappers, B. W.; Keith, M. J.; Ray, P. S.; Kerr, M.

    2015-01-01

    PSR J2032+4127 is a γ-ray and radio-emitting pulsar which has been regarded as a young luminous isolated neutron star. However, its recent spin-down rate has extraordinarily increased by a factor of 2. Here we present evidence that this is due to its motion as a member of a highly-eccentric binary system with an ~15–M⊙ Be star, MT91 213. Timing observations show that, not only are the positions of the two stars coincident within 0.4 arcsec, but timing models of binary motion of the pulsar fit the data much better than a model of a young isolated pulsar. MT91 213, and hence the pulsar, lie in the Cyg OB2 stellar association, which is at a distance of only 1.4–1.7 kpc. The pulsar is currently on the near side of, and accelerating towards, the Be star, with an orbital period of 20–30 yr. Finally, the next periastron is well constrained to occur in early 2018, providing an opportunity to observe enhanced high-energy emission as seen in other Be-star binary systems.

  9. Recommendations and comments on the report of the Ontario Nuclear Safety Review

    1988-12-01

    The report of the Ontario Nuclear Safety Review (ONSR) prepared by Dr. F. Kenneth Hare in March 1988, is reviewed by the Advisory Committee on Nuclear Safety (ACNS) to assess for the Atomic Energy Control Board the relevance and importance of the ONSR recommendations and comments. The ACNS conclusions from this study are embodied in nineteen recommendations, as well as several suggestions and some specific comments

  10. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Wilmot, Roger D. (Galson Sciences Limited (United Kingdom))

    2011-02-15

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  11. The Cosmetic Ingredient Review Program-Expert Safety Assessments of Cosmetic Ingredients in an Open Forum.

    Boyer, Ivan J; Bergfeld, Wilma F; Heldreth, Bart; Fiume, Monice M; Gill, Lillian J

    The Cosmetic Ingredient Review (CIR) is a nonprofit program to assess the safety of ingredients in personal care products in an open, unbiased, and expert manner. Cosmetic Ingredient Review was established in 1976 by the Personal Care Products Council (PCPC), with the support of the US Food and Drug Administration (USFDA) and the Consumer Federation of America (CFA). Cosmetic Ingredient Review remains the only scientific program in the world committed to the systematic, independent review of cosmetic ingredient safety in a public forum. Cosmetic Ingredient Review operates in accordance with procedures modeled after the USFDA process for reviewing over-the-counter drugs. Nine voting panel members are distinguished, such as medical professionals, scientists, and professors. Three nonvoting liaisons are designated by the USFDA, CFA, and PCPC to represent government, consumer, and industry, respectively. The annual rate of completing safety assessments accelerated from about 100 to more than 400 ingredients by implementing grouping and read-across strategies and other approaches. As of March 2017, CIR had reviewed 4,740 individual cosmetic ingredients, including 4,611 determined to be safe as used or safe with qualifications, 12 determined to be unsafe, and 117 ingredients for which the information is insufficient to determine safety. Examples of especially challenging safety assessments and issues are presented here, including botanicals. Cosmetic Ingredient Review continues to strengthen its program with the ongoing cooperation of the USFDA, CFA, the cosmetics industry, and everyone else interested in contributing to the process.

  12. IAEA Issues Report on Mission to Review Japan's Nuclear Power Plant Safety Assessment Process

    2012-01-01

    Full text: A team of international nuclear safety experts has delivered its report on a mission it conducted from 21-31 January 2012 to review Japan's process for assessing nuclear safety at the nation's nuclear power plants. International Atomic Energy Agency (IAEA) officials delivered the IAEA Mission Report to Japanese officials yesterday and made it publicly available today. Following the 11 March 2011 accident at TEPCO's Fukushima Daiichi Nuclear Power Station, Japan's Nuclear and Industrial Safety Agency (NISA) announced the development of a revised safety assessment process for the nation's nuclear power reactors. At the request of the Government of Japan, the IAEA organized a team of five IAEA and three international nuclear safety experts and visited Japan to review NISA's approach to the Comprehensive Assessments for the Safety of Existing Power Reactor Facilities and how NISA examines the results submitted by nuclear operators. A Preliminary Summary Report was issued on 31 January. 'The mission report provides additional information regarding the team's recommendations and overall finding that NISA's instructions to power plants and its review process for the Comprehensive Safety Assessments are generally consistent with IAEA Safety Standards', said team leader James Lyons, Director of the IAEA's Nuclear Installation Safety Division. National safety assessments and their peer review by the IAEA are a key component of the IAEA Action Plan on Nuclear Safety, which was approved by the Agency's Member States following last year's nuclear accident at Fukushima Daiichi Nuclear Power Station. The IAEA safety review mission held meetings in Tokyo with officials from NISA, the Japanese Nuclear Energy Safety Organization (JNES), and the Kansai Electric Power Company (KEPCO), and the team visited the Ohi Nuclear Power Station to see an example of how Japan's Comprehensive Safety Assessment is being implemented by nuclear operators. In its report delivered today

  13. Experience With Laser Safety In The USA--A Review

    Sliney, David H.

    1986-10-01

    Following several research programs in the 1960's aimed at studying the adverse biological effects of lasers and other optical radiation sources, laser occupational exposure limits were set and general safety standards were developed. Today, the experience from laser accidents and the development of new lasers and new applications have altered the format of the exposure limits and the safety procedures. It is critically important to distinguish between different biological injury mechanisms. The biological effects of ultraviolet radiation upon the skin and eye are additive over a period of at least one workday, and require different safety procedures. The scattered UV irradiance from excimer lasers may be quite hazardous, depending upon wavelength and action spectra. Since laser technology is young, the exposure of an individual in natural sunlight must be studied to evaluate the potential for chronic effects. The safety measures necessary in the use of lasers depend upon a hazard evaluation. The appropriate control measures and alternate means of enclosure, baffling, and operational control measures are presented. Present laser safety standards are explained briefly. Eye protective techniques and eyewear are considered for a variety of sources. The optical properties of enclosure materials are also discussed.

  14. Review of TSOs technical needs in safety research and development

    Rintamaa, R.; Bruna, G.

    2012-01-01

    ETSON is the network of European Technical Safety Organizations. The ETSON members have elaborated together a position paper which identifies and ranks the main research and development fields of endeavor in a short, mid and long term perspective. The main research areas and major needs are grouped in 7 areas: 1) safety assessment methods, 2) multi-physics safety approach (several disciplines, macroscopic and microscopic level), 3) Ageing of materials, 4) fuel behaviour, 5) human and organisational factors, 6) instrumentation and control, 7) Severe accidents: phenomenology and methodology, and severe accidents: crisis preparedness and major needs. ETSON has coordinated the activities with other European platforms and has widely contributed to the NUGENIA (Nuclear Generation 2 and 3 Association) topic research and development areas. The next step will be a prioritization of these needs

  15. Patient participation in patient safety and nursing input - a systematic review.

    Vaismoradi, Mojtaba; Jordan, Sue; Kangasniemi, Mari

    2015-03-01

    This systematic review aims to synthesise the existing research on how patients participate in patient safety initiatives. Ambiguities remain about how patients participate in routine measures designed to promote patient safety. Systematic review using integrative methods. Electronic databases were searched using keywords describing patient involvement, nursing input and patient safety initiatives to retrieve empirical research published between 2007 and 2013. Findings were synthesized using the theoretical domains of Vincent's framework for analysing risk and safety in clinical practice: "patient", "healthcare provider", "task", "work environment", "organisation & management". We identified 17 empirical research papers: four qualitative, one mixed-method and 12 quantitative designs. All 17 papers indicated that patients can participate in safety initiatives. Improving patient participation in patient safety necessitates considering the patient as a person, the nurse as healthcare provider, the task of participation and the clinical environment. Patients' knowledge, health conditions, beliefs and experiences influence their decisions to engage in patient safety initiatives. An important component of the management of long-term conditions is to ensure that patients have sufficient knowledge to participate. Healthcare providers may need further professional development in patient education and patient care management to promote patient involvement in patient safety, and ensure that patients understand that they are 'allowed' to inform nurses of adverse events or errors. A healthcare system characterised by patient-centredness and mutual acknowledgement will support patient participation in safety practices. Further research is required to improve international knowledge of patient participation in patient safety in different disciplines, contexts and cultures. Patients have a significant role to play in enhancing their own safety while receiving hospital care. This

  16. Nuclear power systems: Their safety. Current issue review

    Myers, L.C.

    1994-04-01

    Human beings utilize energy in many forms and from a variety of sources. A number of countries have chosen nuclear-electric generation as a component of their energy system. At the end of 1992, there were 419 power reactors operating in 29 countries, accounting for more than 15% of the world's production of electricity. In 1992, 13 countries derived at least 25% of their electricity from nuclear units, with Lithuania leading at just over 78%, followed closely by France at 72%. In the same year, Canada produced about 16% of its electricity from nuclear units. Some 53 power reactors are under construction in 14 countries outside the former USSR. Within the ex-USSR countries, six new reactors are currently under construction. No human endeavour carries the guarantee of perfect safety and the question of whether of not nuclear-electric generation represents an 'acceptable' risk to society has long been vigorously debated. Until the events of late April 1986 in the then Soviet Union, nuclear safety had indeed been an issue for discussion, for some concern, but not for alarm. The accident at the Chernobyl reactor irrevocably changed all that. This disaster brought the matter of nuclear safety into the public mind in a dramatic fashion. Subsequent opening of the ex-Soviet nuclear power program to outside scrutiny has done little to calm people's concerns about the safety of nuclear power in that part of the world. This paper discusses the issue of safety in complex energy systems and provides brief accounts of some of the most serious reactor accidents that have occurred to date, as well as more recent, less dramatic events touching on the safety issue. (author). 7 refs

  17. PSR J1618-3921: a recycled pulsar in an eccentric orbit

    Octau, F.; Cognard, I.; Guillemot, L.; Tauris, T. M.; Freire, P. C. C.; Desvignes, G.; Theureau, G.

    2018-04-01

    Context. The 11.99 ms pulsar PSR J1618-3921 orbits a He white dwarf companion of probably low mass with a period of 22.7 d. The pulsar was discovered in a survey of the intermediate Galactic latitudes at 1400 MHz that was conducted with the Parkes radio telescope in the late 1990s. Although PSR J1618-3921 was discovered more than 15 years ago, only limited information has been published about this pulsar, which has a surprisingly high orbital eccentricity (e ≃ 0.027) considering its high spin frequency and the likely low mass of the companion. Aims: The focus of this work is a precise measurement of the spin and the astrometric and orbital characteristics of PSR J1618-3921. This was done with timing observations made at the Nançay Radio Telescope from 2009 to 2017. Methods: We analyzed the timing data recorded at the Nançay Radio Telescope over several years to characterize the properties of PSR J1618-3921. A rotation ephemeris for this pulsar was obtained by analyzing the arrival times of the radio pulses at the telescope. Results: We confirm the unusual eccentricity of PSR J1618-3921 and discuss several hypotheses regarding its formation in the context of other discoveries of recycled pulsars in eccentric orbits.

  18. The safety of Ontario's nuclear power reactors. A scientific and technical review. A submission to the Ontario Nuclear Safety Review by Atomic Energy Canada Limited

    1987-01-01

    This submission comments on the evolution of the Canadian nuclear program, the management of safety, and the reactor design, analysis, operation and research programs that contribute to the safety of the CANDU reactor and provide assurance of safety to the regulatory agency and to the public. The CANDU reactor system has been designed and developed with close cooperation between Atomic Energy of Canada Ltd. (AECL), utilities, manufacturers, and the Atomic Energy Control Board (AECB). The AECB has the responsibility, on behalf of the public, for establishing acceptable standards with respect to public risk and for establishing through independent review that these standards are satisfied. The plant designer has responsibility for defining how those standards will be met. The plant operator has responsibility for operating within the framework of those standards. The Canadian approach to safety design is based on the philosophy of defence in depth. Defence in depth is achieved through a high level of equipment quality, system redundancy and fail-safe design; regulating and process systems designed to maintain all process systems within acceptable operating parameters; and, independent safety systems to shut down the reactor, provide long-term cooling, and contain potential release of radioactivity in the event of an accident. The resulting design meets regulatory requirements not only in Canada but also in other countries. Probabilistic safety and risk evaluations show that the CANDU design offers a level of safety and least as good as other commercially available reactor designs

  19. Bohunice V-1. Review of safety upgrading and operating experiences

    Korec, J.; Kuschel, D.

    2000-01-01

    The Bohunice site in the Slovak Republic has two Russian-designed twin-unit nuclear power plants, one equipped with reactors of the WWER 440/230 type, the other with type WWER 440/213 reactors. Two older units (V-1) started commercial operation in late 1978 and 1980 respectively and have been supplying electricity to the national grid since that time without any events that could have degraded plant safety level. In the period prior to 1990 the utility Slovenske Elektrarne (S.E.) performed extensive modifications and upgrades to the original design of the two older units V-1 NPP. Furthermore, significant steps in safety improvement for Bohunice NPP V-1 have been made since 1990. Following the political restructuring of the former Czechoslovakia and the country's new open-door policy towards western organizations, several international expert missions were focused on evaluation of Bohunice NPP safety status level and operational reliability, particularly targeting the two older units. Based on recommendations of individual expert missions and complementary deterministic and probabilistic safety analyses performed by S.E., the Czechoslovak Nuclear Regulatory Authority issued the Resolution No. 5/91 defining 81 measures concerning further safety and reliability improvement of Bohunice V1 .A range of short-term and long-term upgrades was prioritised in terms of importance to plant safety and work to implement these measures commenced in the early nineties. During the 'Small Reconstruction' from 1991 to 1993 some of the short term upgrading measures were realized to eliminate the most serious safety deficits, thus to achieve a significant reduction in core damage frequency and a major improvement in confinement integrity. In this paper and presentation the goals of the gradual reconstruction project, basic engineering, detailed engineering and realization, last major stage of Unit 2 upgrade, as well as final stage of Unit 1 upgrade in early 2000 are presented

  20. Classification of antecedents towards safety use of health information technology: A systematic review.

    Salahuddin, Lizawati; Ismail, Zuraini

    2015-11-01

    This paper provides a systematic review of safety use of health information technology (IT). The first objective is to identify the antecedents towards safety use of health IT by conducting systematic literature review (SLR). The second objective is to classify the identified antecedents based on the work system in Systems Engineering Initiative for Patient Safety (SEIPS) model and an extension of DeLone and McLean (D&M) information system (IS) success model. A systematic literature review (SLR) was conducted from peer-reviewed scholarly publications between January 2000 and July 2014. SLR was carried out and reported based on the preferred reporting items for systematic reviews and meta-analyses (PRISMA) statement. The related articles were identified by searching the articles published in Science Direct, Medline, EMBASE, and CINAHL databases. Data extracted from the resultant studies included are to be analysed based on the work system in Systems Engineering Initiative for Patient Safety (SEIPS) model, and also from the extended DeLone and McLean (D&M) information system (IS) success model. 55 articles delineated to be antecedents that influenced the safety use of health IT were included for review. Antecedents were identified and then classified into five key categories. The categories are (1) person, (2) technology, (3) tasks, (4) organization, and (5) environment. Specifically, person is attributed by competence while technology is associated to system quality, information quality, and service quality. Tasks are attributed by task-related stressor. Organisation is related to training, organisation resources, and teamwork. Lastly, environment is attributed by physical layout, and noise. This review provides evidence that the antecedents for safety use of health IT originated from both social and technical aspects. However, inappropriate health IT usage potentially increases the incidence of errors and produces new safety risks. The review cautions future

  1. Energy Storage System Safety: Plan Review and Inspection Checklist

    Cole, Pam C (PNNL); Conover, David R (PNNL)

    2017-03-01

    Codes, standards, and regulations (CSR) governing the design, construction, installation, commissioning, and operation of the built environment are intended to protect the public health, safety, and welfare. While these documents change over time to address new technology and new safety challenges, there is generally some lag time between the introduction of a technology into the market and the time it is specifically covered in model codes and standards developed in the voluntary sector. After their development, there is also a timeframe of at least a year or two until the codes and standards are adopted. Until existing model codes and standards are updated or new ones are developed and then adopted, one seeking to deploy energy storage technologies or needing to verify the safety of an installation may be challenged in trying to apply currently implemented CSRs to an energy storage system (ESS). The Energy Storage System Guide for Compliance with Safety Codes and Standards1 (CG), developed in June 2016, is intended to help address the acceptability of the design and construction of stationary ESSs, their component parts, and the siting, installation, commissioning, operations, maintenance, and repair/renovation of ESS within the built environment.

  2. A review of international sources for road safety measures assessment.

    Yannis, G. Weijermars, W. & Kauppila, J.

    2012-01-01

    The efficiency assessment of road safety measures is considered to be an extremely useful tool in decision making; in particular, cost-benefit and cost-effectiveness analyses are carried out in several countries, in a more or less systematic way. The objective of this paper is to present findings

  3. Review of the World Bank Road Safety website.

    Maas, J.M.

    2006-01-01

    The Road Safety website of The World Bank needs to be redeveloped. The website should reflect the new developments in the work field and the IT policy of The World Bank and support its implementation. The report is meant as a brief business case, describing the target audience, purposes of the site,

  4. Safety of nanofood: A review | Ijabadeniyi | African Journal of ...

    Introduction of genetically modified (GM) foods generated a lot of controversy few years back, now it is the turn of nanofoods. There has been debate on the safety of foods that have been produced directly or indirectly with nanomaterials. Nanoparticles or nanotechnology procedures may be used to make food products, ...

  5. Gender issues in safety and health at work : a review

    Houtman, I.L.D.; Kauppinen, K.; Kumpulainen, R.; Goudswaard, A.

    2003-01-01

    This report explores the gender differences in occupational safety and health. There is strong segregation of women and men into different jobs and tasks at work. Both men and women face significant risks. In general, men suffer more accidents and injuries at work than women do, whereas women report

  6. Review of Safety of Diagnostic Ultrasound in Medical Practice ...

    In Nigeria, there is a dearth of scientific literature about the safety of ultrasound as a diagnostic modality. Because of its low cost, real-time image display and lack of evidence of bio-effects, ultrasound is a fast growing imaging modality. The impact of ultrasound in the care of women and children is most obvious. Information ...

  7. Occupational Health and Safety in Ethiopia: A review of Situational ...

    The organization of occupational health and safety services is not yet resilient enough to handle the growing demands for workers' health in the context of industrialization. ... Commonly observed hazards in the workplace include occupational noise and ... Exposure to dust in textile and cement factories greatly exceeded ...

  8. SKI - ASAR - B1/B2 As operated Safety Analysis Report. Recurring safety review 1995 Barsebaeck 1 and 2

    1996-12-01

    According to Swedish law, the reactor owner is responsible for performing a safety review and writing a so called ASAR-report. The Nuclear Power Inspectorate (SKI) examines this report, and reports the findings to the government (the so called SKI-ASAR-report). Each Swedish reactor should pass through three full ASAR reviews during its lifetime, similar to the licensing inspection before start-up of the reactor. The second series ASAR was delivered by the Barsebaeck utility to SKI in September 1995, and forms the basis for the SKI analysis in the present report

  9. The Structure and Application of High Level Safety Goals. A Review by the MDEP Sub-committee on Safety Goals

    2011-01-01

    One of the aims of MDEP is to work towards greater harmonisation of regulatory requirements. To achieve this aim, it is necessary that there is a degree of convergence on the safety goals that are required to be met by designers and operators. The term 'safety goals' is defined to cover all health and safety requirements which must be met: these may be deterministic rules and/or probabilistic targets. They should cover the safety of workers, public and the environment in line with the IAEA's Basic Safety Objective; encompassing safety in normal operation through to severe accidents. All regulators have safety goals, but these are expressed in many different ways and exercises in comparing them frequently are done at a very low level eg specific temperatures in the reactor vessel. The differences in the requirements from different regulators are difficult to resolve as the goals are derived using different principles and assumptions and are for a specific technology. Therefore MDEP set up a sub-committee to investigate a different approach. This approach was to start with the top level goals and to derive a structure and means of deriving lower tier goals that can be seen to be clearly related to the higher level ones. This approach has the potential to greatly assist in the process of harmonisation of regulatory requirements. The paper reviews the high level goals used in MDEP countries and the relevant work of international groups. From these it draws broad conclusions that the form of the framework should be an Hierarchical Structure of Safety Goals, incorporating an extended Defense-in-Depth approach. The basis concept is that the higher level safety goals can then developed, in a coherent and consistent manner, into lower level safety goals and targets that can be applied within the design and operation of reactors, with a clear connection between the different levels. This structured approach is technology-neutral and is sufficiently flexible that it can be

  10. International review on safety requirements for the prototype fast breeder reactor “Monju”

    2016-01-01

    In response to the lessons learned from the serious nuclear accidents at the TEPCO's Fukushima Daiichi Nuclear Power Stations, an advisory committee, which was set up by the Japan Atomic Energy Agency, issued the report “Safety Requirements Expected to the Prototype Fast Breeder Reactor Monju” taking into account the SFR specific safety characteristics in July 2014. The report was reviewed by the leading international experts on SFR safety from five countries and one international organization in order to obtain independent and objective evaluation. The international review comments on each subsection were collected and compiled, and then a summary of results was derived through the discussion at the review meeting and individual feedbacks. As a result the basic concept for prevention of severe accidents and mitigation of their consequences of Monju is appropriate in consideration of SFR specific safety characteristics, and is in accordance with international common understanding. (author)

  11. International review on safety requirements for the prototype fast breeder reactor “Monju” (Translated document)

    2016-02-01

    In response to the lessons learned from the serious nuclear accidents at the TEPCO's Fukushima Daiichi Nuclear Power Stations, an advisory committee, which was set up by the Japan Atomic Energy Agency, issued the report “Safety Requirements Expected to the Prototype Fast Breeder Reactor Monju” taking into account the SFR specific safety characteristics in July 2014. The report was reviewed by the leading international experts on SFR safety from five countries and one international organization in order to obtain independent and objective evaluation. The international review comments on each subsection were collected and compiled, and then a summary of results was derived through the discussion at the review meeting and individual feedbacks. As a result the basic concept for prevention of severe accidents and mitigation of their consequences of Monju is appropriate in consideration of SFR specific safety characteristics, and is in accordance with international common understanding. (author)

  12. Review and assessment of nuclear facilities by the regulatory body. Safety guide

    2004-01-01

    The purpose of this Safety Guide is to provide recommendations for regulatory bodies on reviewing and assessing the various safety related submissions made by the operator of a nuclear facility at different stages (siting, design, construction, commissioning, operation and decommissioning or closure) in the facility's lifetime to determine whether the facility complies with the applicable safety objectives and requirements. This Safety Guide covers the review and assessment of submissions in relation to the safety of nuclear facilities such as: enrichment and fuel manufacturing plants. Nuclear power plants. Other reactors such as research reactors and critical assemblies. Spent fuel reprocessing plants. And facilities for radioactive waste management, such as treatment, storage and disposal facilities. This Safety Guide also covers issues relating to the decommissioning of nuclear facilities, the closure of waste disposal facilities and site rehabilitation. Objectives, management, planning and organizational matters relating to the review and assessment process are presented in Section 2. Section 3 deals with the bases for decision making and conduct of the review and assessment process. Section 4 covers aspects relating to the assessment of this process. The Appendix provides a generic list of topics to be covered in the review and assessment process

  13. Review and assessment of nuclear facilities by the regulatory body. Safety guide

    2005-01-01

    The purpose of this Safety Guide is to provide recommendations for regulatory bodies on reviewing and assessing the various safety related submissions made by the operator of a nuclear facility at different stages (siting, design, construction, commissioning, operation and decommissioning or closure) in the facility's lifetime to determine whether the facility complies with the applicable safety objectives and requirements. This Safety Guide covers the review and assessment of submissions in relation to the safety of nuclear facilities such as: enrichment and fuel manufacturing plants. Nuclear power plants. Other reactors such as research reactors and critical assemblies. Spent fuel reprocessing plants. And facilities for radioactive waste management, such as treatment, storage and disposal facilities. This Safety Guide also covers issues relating to the decommissioning of nuclear facilities, the closure of waste disposal facilities and site rehabilitation. Objectives, management, planning and organizational matters relating to the review and assessment process are presented in Section 2. Section 3 deals with the bases for decision making and conduct of the review and assessment process. Section 4 covers aspects relating to the assessment of this process. The Appendix provides a generic list of topics to be covered in the review and assessment process

  14. Aviation and healthcare: a comparative review with implications for patient safety.

    Kapur, Narinder; Parand, Anam; Soukup, Tayana; Reader, Tom; Sevdalis, Nick

    2016-01-01

    Safety in aviation has often been compared with safety in healthcare. Following a recent article in this journal, the UK government set up an Independent Patient Safety Investigation Service, to emulate a similar well-established body in aviation. On the basis of a detailed review of relevant publications that examine patient safety in the context of aviation practice, we have drawn up a table of comparative features and a conceptual framework for patient safety. Convergence and divergence of safety-related behaviours across aviation and healthcare were derived and documented. Key safety-related domains that emerged included Checklists, Training, Crew Resource Management, Sterile Cockpit, Investigation and Reporting of Incidents and Organisational Culture. We conclude that whilst healthcare has much to learn from aviation in certain key domains, the transfer of lessons from aviation to healthcare needs to be nuanced, with the specific characteristics and needs of healthcare borne in mind. On the basis of this review, it is recommended that healthcare should emulate aviation in its resourcing of staff who specialise in human factors and related psychological aspects of patient safety and staff wellbeing. Professional and post-qualification staff training could specifically include Cognitive Bias Avoidance Training, as this appears to play a key part in many errors relating to patient safety and staff wellbeing.

  15. Defining and Measuring Safety Climate: A Review of the Construction Industry Literature.

    Schwatka, Natalie V; Hecker, Steven; Goldenhar, Linda M

    2016-06-01

    Safety climate measurements can be used to proactively assess an organization's effectiveness in identifying and remediating work-related hazards, thereby reducing or preventing work-related ill health and injury. This review article focuses on construction-specific articles that developed and/or measured safety climate, assessed safety climate's relationship with other safety and health performance indicators, and/or used safety climate measures to evaluate interventions targeting one or more indicators of safety climate. Fifty-six articles met our inclusion criteria, 80% of which were published after 2008. Our findings demonstrate that researchers commonly defined safety climate as perception based, but the object of those perceptions varies widely. Within the wide range of indicators used to measure safety climate, safety policies, procedures, and practices were the most common, followed by general management commitment to safety. The most frequently used indicators should and do reflect that the prevention of work-related ill health and injury depends on both organizational and employee actions. Safety climate scores were commonly compared between groups (e.g. management and workers, different trades), and often correlated with subjective measures of safety behavior rather than measures of ill health or objective safety and health outcomes. Despite the observed limitations of current research, safety climate has been promised as a useful feature of research and practice activities to prevent work-related ill health and injury. Safety climate survey data can reveal gaps between management and employee perceptions, or between espoused and enacted policies, and trigger communication and action to narrow those gaps. The validation of safety climate with safety and health performance data offers the potential for using safety climate measures as a leading indicator of performance. We discuss these findings in relation to the related concept of safety culture and

  16. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    2005-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards; - Integrated approach to the provision for the application of safety standards; and - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices; on the capability and reliability of the commissioning and operating personnel; on comprehensive instructions; and on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  17. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    2008-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  18. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    2007-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  19. Nuclear Installation Safety: General Observations and Trends from IAEA Peer Reviews

    Rzentkowski, G.

    2016-01-01

    The Safety Review Services (SRSs) for nuclear installations address the needs of Member States at all stages of installations’ lifecycle. SRSs are based on the IAEA Safety Standards and are provided on Member States’ request to peer review national regulatory frameworks and safety provisions for nuclear installations. They result in recommendations and suggestions to improve national regulations and operational safety, and serve to exert peer pressure to ensure that that every Member State with nuclear installations recognizes its safety responsibility and the need to comply with the IAEA Safety Standards. This presentation provides an overview of SRSs for Nuclear Installations, including their structure and main subject areas. The presentation also summarizes general findings and trends which clearly demonstrate that there is continuous improvement in regulation of nuclear installations and in safety of their operation. Nevertheless, there is the need to further enhance the efficiency and effectiveness of SRSs through review of the overall governance model and service delivery to better serve the needs of Member States. The presentation points out some areas of improvements which have already been implemented or are being considered for implementation. Just as important, SRSs are conducted by teams of experts from around the world to strengthening international cooperation, ensure diversity and impartiality, and improve the overall quality of the safety review being conducted. The review team members are also provided with the opportunity for mutual learning and sharing good practices among themselves and with the Member State undergoing the review. As a result, SRAs play an important role in a quest to harmonize regulatory requirements and approaches globally. (author)

  20. A review of the report ''IAEA safety targets and probabilistic risk assessment'' prepared for Greenpeace International

    1991-01-01

    At the request of the Director General, INSAG reviewed the report ''IAEA Safety Targets and Probabilistic Risk Assessment'' prepared for Greenpeace International by the Gesellschaft fuer Oekologische Forschung und Beratung mbH, Hannover, Germany. The conclusions of the report as well as the review results of INSAG experts are reproduced in this document

  1. 78 FR 4477 - Review of Safety Analysis Reports for Nuclear Power Plants, Introduction

    2013-01-22

    ... Analysis Reports for Nuclear Power Plants: LWR Edition.'' The new subsection is the Standard Review Plan... Nuclear Power Plants: Integral Pressurized Water Reactor (iPWR) Edition.'' DATES: Comments must be filed... NUCLEAR REGULATORY COMMISSION [NRC-2012-0268] Review of Safety Analysis Reports for Nuclear Power...

  2. Review on Dutch-German steam generator safety activities in the field of SNR-development

    Dumm, K.; Westenbrugge, J.K. van

    1984-01-01

    This paper reviews the results of the experimental and theoretical safety related work for SNR steam generators in brief. A review of the operating experience with SNR-300 sodium-water heat-exchangers and protection philosophy used in SNR-2 is also given

  3. Development of a draft of human factors safety review procedures for the Korean next generation reactor

    Lee, Jung Woon; Moon, B. S.; Park, J. C.; Lee, Y. H.; Oh, I. S.; Lee, H. C. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-02-01

    In this study, a draft of human factors engineering (HFE) safety review procedures (SRP) was developed for the safety review of KNGR based on HFE Safety and Regulatory Requirements and Guidelines (SRRG). This draft includes acceptance criteria, review procedure, and evaluation findings for the areas of review including HFE Program Management, Human Factors Analyses, Human Factors Design, and HFE Verification and Validation, based on Section 15.1 'Human Factors Engineering Design Process' and 15.2 'Control Room Human Factors Engineering' of KNGR Specific Safety Requirements and Chapter 15 'Human Factors Engineering' of KNGR Safety Regulatory Guides. For the effective review, human factors concerns or issues related to advanced HSI design that have been reported so far should be extensively examined. In this study, a total of 384 human factors issues related to the advanced HSI design were collected through our review of a total of 145 documents. A summary of each issue was described and the issues were identified by specific features of HSI design. These results were implemented into a database system. 8 refs., 2 figs. (Author)

  4. Development of a draft of human factors safety review procedures for the Korean Next Generation Reactor

    Lee, Jung Woon; Moon, B. S.; Park, J. C.; Lee, Y. H.; Oh, I. S.; Lee, H. C.

    2000-02-01

    In this study, a draft of Human Factors Engineering (HFE) Safety Review Procedures (SRP) was developed for the safety review of KNGR based on HFE Safety and Regulatory Requirements and Guidelines (SRRG). This draft includes acceptance criteria, review procedure, and evaluation findings for the areas of review including HFE program management, human factors analyses, human factors design, and HFE verification and validation, based on section 15.1 'human factors engineering design process' and 15.2 'control room human factors engineering' of KNGR specific safety requirements and chapter 15 'human factors engineering' of KNGR safety regulatory guides. For the effective review, human factors concerns or issues related to advanced HSI design that have been reported so far should be extensively examined. In this study, a total of 384 human factors issues related to the advanced HSI design were collected through our review of a total of 145 documents. A summary of each issue was described and the issues were identified by specific features of HSI design. These results were implemented into a database system

  5. Idaho National Laboratory Integrated Safety Management System 2010 Effectiveness Review and Declaration Report

    Thomas J. Haney

    2010-12-01

    Idaho National Laboratory completes an annual Integrated Safety Management System effectiveness review per 48 CFR 970.5223-1 “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assesses ISMS effectiveness, provides feedback to maintain system integrity, and helps identify target areas for focused improvements and assessments for the following year. Using one of the three Department of Energy (DOE) descriptors in DOE M 450.4-1 regarding the state of ISMS effectiveness during Fiscal Year (FY) 2010, the information presented in this review shows that INL achieved “Effective Performance.”

  6. End of mission report on seismic safety review mission for Belene NPP site

    Gurpinar, A.; Mohammadioun, B.; Schneider, H.; Serva, L.

    1995-01-01

    Upon the invitation of the Bulgarian government through the Committee for the Peaceful Uses of Atomic Energy and within the framework of the implementation of the Technical Cooperation project BUL/9/012 related to site and seismic of NPPs, a mission visited Sofia 3 - 7 July 1995. The mission constituted a follow-up of the interim review of subjects related to tectonic stability and seismic hazard characterization of the site which was performed in September 1993. The main objective of the mission was the final review of the subjects already reviewed in September 1993 as well as issues related to geotechnical engineering and foundation safety. The main terms of reference of the present mission was to verify the implementation of the recommendations of the Site Safety Review Mission of June 1990. This document gives findings on geology-tectonics, seismology and foundation safety. In the end conclusions and recommendations of the mission are presented

  7. An updated status of Department of Energy safety reviews of packages for transporting radioactive material

    Kapoor, A.

    1995-01-01

    The Department of Energy conducts conformance reviews and issues Certificates of Compliance for Type B packaging for radioactive materials. Several offices within DOE perform these reviews which are required by the Department of Transportation to be to the regulations promulgated by the Nuclear Regulatory Commission or their safety equivalent. This paper focuses on one of these offices, the Office of Facility Safety Analysis, EH-32, which is responsible for reviewing and certifying packages other than those used for weapons and weapons component, for Naval Reactors, and for Civilian Radioactive Waste Management. This paper gives the background and organizational history of EH-32, discusses the version of regulations to which the packaging is reviewed, updates the status of these reviews, describes the effectiveness of the reviews, updates the training courses sponsored by EH-32, and mentions the new Quality Assurance Evaluations being started by EH-32

  8. International experts conclude IAEA peer review of Iran's safety regulation of Bushehr NPP

    2010-01-01

    Full text: An international team of nuclear safety experts today completed an IAEA mission to review the effectiveness of Iran's safety regulation of its first nuclear power plant and to identify possible improvements before the plant begins operation. Upon invitation of the Islamic Republic of Iran, the International Atomic Energy Agency (IAEA) assembled a team of senior regulators from seven Member States for an Integrated Regulatory Review Service (IRRS) mission. The scope of the mission was limited to the safety regulation of Bushehr nuclear power plant (BNPP-1). The IRRS review took place from 20 February to 2 March at the INRA offices in Tehran and included a technical visit to the BNPP-1 site. The mission was an objective peer review based on IAEA safety standards, and was neither an inspection, nor an audit. Ms. Olena Mykolaichuk, IRRS Team Leader and Head of the State Nuclear Regulatory Committee of Ukraine, commended her INRA counterparts: 'The regulatory work performed on the Bushehr construction and in preparation for commissioning has demonstrated significant progress of INRA as a nuclear regulatory authority,' she said. Philippe Jamet, Director of the IAEA's Nuclear Installation Safety Division, added: 'Through this IRRS mission, both Iran and the international experts contribute to the enhancement of nuclear safety and worldwide experience sharing.' In the course of its review the IRRS team identified the following strengths: - INRA has a dedicated, conscientious staff, demonstrating clear commitments to further improvements. - INRA clearly recognizes the value of peer reviews and international cooperation regarding nuclear safety. - Despite a shortage of staff, INRA demonstrated strong leadership while performing both review and assessment and inspection tasks during the BNPP-1 construction and pre-commissioning. - INRA has developed an excellent computerized documentation control system. Recommendations and suggestions to improve INRA's regulatory

  9. Second review meeting of the Contracting Parties to the Convention on Nuclear Safety

    Rafferty, Barbara

    2002-01-01

    The Second Review Meeting of the Contracting Parties to the Convention on Nuclear Safety was held in the Headquarters of the International Atomic Energy Agency in Vienna from 15-26 April 2002, under the chairmanship of the President, Mr Miroslav Gregoric, Director of the Slovenian Nuclear Safety Authority. The Convention on Nuclear Safety entered into force in October 1996, has been signed by sixty-five States and ratified by fifty-four, bringing within its scope 428 of the 448 nuclear reactors worldwide. The Convention aims to achieve and maintain a high level of nuclear safety worldwide, through inter alia enhancement of national measures and international co-operation. Obligations on Contracting Parties in accordance with the Convention include: the establishment and maintenance of a legislative and regulatory framework to govern the safety of land-based civil nuclear installations; the allocation of adequate financial and human resources to support the safety objectives; ensuring that all reasonably practicable improvements to safety are made as a matter of urgency. Adherence to this Convention entails two basic commitments by each Contracting Party: to prepare and make available a national report for review; and to subject its national report to a peer review by the other Contracting Parties. Thus, being a Contracting Party to this Convention involves: including in the national report a self-assessment of steps and measures already taken and in progress to implement the Convention obligations; taking an active part in an open and transparent review of its national report and the Reports of other Contracting Parties; and a commitment to a continuous learning and improving process, something which is a key element of a strong safety culture. The peer review of national reports takes place every three years, the first having been held in 1999. The Second Review Meeting was attended by delegates from 46 contracting parties. During the review certain issues were

  10. Immunization safety review: vaccinations and sudden unexpected death in infancy

    Institute of Medicine (U.S.). Immunization Safety Review Committee; Stratton, Kathleen R

    2003-01-01

    ...), and neonatal death (infant death, whether sudden or not, during the first 4 weeks of life). Based on this review, the committee concluded that the evidence favors rejection of a causal relationship between some vaccines and SIDS...

  11. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    Herborn, D.I.

    1993-11-01

    Westinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals

  12. Overview of the periodic safety review of nuclear power plants as practised in India

    Jhamb, N.K.; Chande, S.K.

    1997-01-01

    In India, routine and periodic safety reviews of nuclear facilities are carried out through a multitiered hierarchy of committees at the plant level, the operating organization level and the regulatory body level. In 1993, it was decided by the Atomic Energy Regulatory Board (AERB, the regulatory body) that, as a policy, authorization for operation of nuclear power plants (NPPs) shall have a validity period of 5 years, after which this authorization will have to be renewed. NPPs have to carry out a self-assessment according to an established procedure, prepare a Safety Assessment Report for Renewal of Authorization (SARRA) and submit it to the AERB for review. The procedure defines the objectives of the report and gives guidelines on the required review of the self-assessment of the operational plant safety. The paper discusses the objectives, the elements of the SARRA review, the review process, the SARRA review carried out in 1993-1994, the basis for acceptability of continued plant operation, and the lessons learned for future periodic safety reviews in India and for exchange of operating experience feedback. (author)

  13. A LITERATURE REVIEW ON GLOBAL OCCUPATIONAL SAFETY AND HEALTH PRACTICE & ACCIDENTS SEVERITY

    Kassu Jilcha

    2016-06-01

    Full Text Available This literature review focuses on researches undertaken since 1980s onwards. The purpose of the study is to identify existing gaps on workplace safety and health management and propose future research areas. The review adds value to existing electronic database through integration of researches' results. To identify existing gaps, a systematic literature review approach has been used. The reviews were undertaken through keywords and safety related topics. In the literature, various characteristics of workplace safety and health problems were found emanating from the lack of operational activities of the employees, internal working environment and external environment those impose hazards on employee temporarily, permanently and on working environments. The integration of multidisciplinary approaches and collaborative model of hub and peripheral industries to protect workplace safety hazards to develop multilevel model has been undermined in many researches. The other face of finding is that knowledge transfer mechanism and industrial topology factors are left. Some researches finding showed that they have focused on single problems related to health and health factors leaving universal improving workplace safety. In general, this literature reviews compare various studies output based on their research method and findings to fills gap and add value to a body of knowledge.

  14. Regulatory instrument review: Management of aging of LWR [light water reactor] major safety-related components

    Werry, E.V.

    1990-10-01

    This report comprises Volume 1 of a review of US nuclear plant regulatory instruments to determine the amount and kind of information they contain on managing the aging of safety-related components in US nuclear power plants. The review was conducted for the US Nuclear Regulatory Commission (NRC) by the Pacific Northwest Laboratory (PNL) under the NRC Nuclear Plant Aging Research (NPAR) Program. Eight selected regulatory instruments, e.g., NRC Regulatory Guides and the Code of Federal Regulations, were reviewed for safety-related information on five selected components: reactor pressure vessels, steam generators, primary piping, pressurizers, and emergency diesel generators. Volume 2 will be concluded in FY 1991 and will also cover selected major safety-related components, e.g., pumps, valves and cables. The focus of the review was on 26 NPAR-defined safety-related aging issues, including examination, inspection, and maintenance and repair; excessive/harsh testing; and irradiation embrittlement. The major conclusion of the review is that safety-related regulatory instruments do provide implicit guidance for aging management, but include little explicit guidance. The major recommendation is that the instruments be revised or augmented to explicitly address the management of aging

  15. Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report

    Farren Hunt

    2012-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.

  16. Food Safety Evaluation Based on Near Infrared Spectroscopy and Imaging: A Review.

    Fu, Xiaping; Ying, Yibin

    2016-08-17

    In recent years, due to the increasing consciousness of food safety and human health, much progress has been made in developing rapid and nondestructive techniques for the evaluation of food hazards, food authentication, and traceability. Near infrared (NIR) spectroscopy and imaging techniques have gained wide acceptance in many fields because of their advantages over other analytical techniques. Following a brief introduction of NIR spectroscopy and imaging basics, this review mainly focuses on recent NIR spectroscopy and imaging applications for food safety evaluation, including (1) chemical hazards detection; (2) microbiological hazards detection; (3) physical hazards detection; (4) new technology-induced food safety concerns; and (5) food traceability. The review shows NIR spectroscopy and imaging to be effective tools that will play indispensable roles for food safety evaluation. In addition, on-line/real-time applications of these techniques promise to be a huge growth field in the near future.

  17. SAFETY

    Niels Dupont

    2013-01-01

    CERN Safety rules and Radiation Protection at CMS The CERN Safety rules are defined by the Occupational Health & Safety and Environmental Protection Unit (HSE Unit), CERN’s institutional authority and central Safety organ attached to the Director General. In particular the Radiation Protection group (DGS-RP1) ensures that personnel on the CERN sites and the public are protected from potentially harmful effects of ionising radiation linked to CERN activities. The RP Group fulfils its mandate in collaboration with the CERN departments owning or operating sources of ionising radiation and having the responsibility for Radiation Safety of these sources. The specific responsibilities concerning "Radiation Safety" and "Radiation Protection" are delegated as follows: Radiation Safety is the responsibility of every CERN Department owning radiation sources or using radiation sources put at its disposition. These Departments are in charge of implementing the requi...

  18. Review of the Safety and Efficacy of Moringa oleifera.

    Stohs, Sidney J; Hartman, Michael J

    2015-06-01

    Moringa oleifera leaves, seeds, bark, roots, sap, and flowers are widely used in traditional medicine, and the leaves and immature seed pods are used as food products in human nutrition. Leaf extracts exhibit the greatest antioxidant activity, and various safety studies in animals involving aqueous leaf extracts indicate a high degree of safety. No adverse effects were reported in association with human studies. Five human studies using powdered whole leaf preparations of M. oleifera have been published, which have demonstrated anti-hyperglycemic (antidiabetic) and anti-dyslipidemic activities. These activities have been confirmed using extracts as well as leaf powders in animal studies. A rapidly growing number of published studies have shown that aqueous, hydroalcohol, or alcohol extracts of M. oleifera leaves possess a wide range of additional biological activities including antioxidant, tissue protective (liver, kidneys, heart, testes, and lungs), analgesic, antiulcer, antihypertensive, radioprotective, and immunomodulatory actions. A wide variety of polyphenols and phenolic acids as well as flavonoids, glucosinolates, and possibly alkaloids is believed to be responsible for the observed effects. Standardization of products is an issue. However, the results of published studies to date involving M. oleifera are very promising. Additional human studies using standardized extracts are highly desirable. © 2015 The Authors Phytotherapy Research Published by John Wiley & Sons Ltd.

  19. The CABRI facility: Implementation of a pressurized water loop and related safety review

    Cabrillat, J.C.; Maegey, M.; Bourguignon, D.; Miachon, G.; Forestier, F.; Coulon, J.P.; Faury, M.

    2003-01-01

    The CABRI reactor operated by CEA at the CADARACHE Nuclear Center in France provided the condition for safety studies on nuclear fuel. Initially designed to support investigations on Fast Reactor fuel, large modifications are underway to provide representative conditions for studies on Light Water Fuel types. A general overview of these modifications, the related safety review and supporting studies are described in the paper. (author)

  20. A review on food safety and food hygiene studies in Ghana

    Ababio, P. F.; Lovatt, P.

    2015-01-01

    Food safety and hygiene in Ghana was studied using desk top literature review. Food research was highly concentrated in the capital city of the country and most research focus were on commercial food operations specifically street foods and microbiological safety with limited information from institutional catering and other forms of food hazards. The media currently serves as the main source for reporting of food borne diseases. Food establishments and other sources contributing to food born...

  1. Review of Risk Reduction Methods using Probabilistic Safety Assessment Insights and Improved Technology

    Lee, Eun-Chan; Choi, Byung-Pil [Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2016-10-15

    As seen in the process of the periodic safety review of domestic nuclear power plants, the risk management objectives such as core damage frequency and large early release frequency are not easy to be met without continuous safety improvements and the integratoin of the improved technologies into the PSA evaluation methodologies. Because external event analyses have a protion of uncertainty factors in the current analysis methodologies, the technical efforts in various perspectives.

  2. Perceived personal safety in relation to urban woodland vegetation – A review

    Jansson, Märit; Fors, Hanna; Lindgren, Therese; Wiström, Björn

    2013-01-01

    Urban woodland vegetation provides people with many aesthetic, ecological and psychological benefits, but can also generate problems concerning people’s perception of safety. This paper reviews existing knowledge about perceived personal safety in relation to vegetation, particularly woodland vegetation, in urban green spaces such as parks and residential areas. Individual and social factors, but also vegetation character, maintenance and design, proved to be important for perceived personal ...

  3. Design Review Report for formal review of safety class features of exhauster system for rotary mode core sampling

    JANICEK, G.P.

    2000-01-01

    Report documenting Formal Design Review conducted on portable exhausters used to support rotary mode core sampling of Hanford underground radioactive waste tanks with focus on Safety Class design features and control requirements for flammable gas environment operation and air discharge permitting compliance

  4. Design Review Report for formal review of safety class features of exhauster system for rotary mode core sampling

    JANICEK, G.P.

    2000-06-08

    Report documenting Formal Design Review conducted on portable exhausters used to support rotary mode core sampling of Hanford underground radioactive waste tanks with focus on Safety Class design features and control requirements for flammable gas environment operation and air discharge permitting compliance.

  5. The effectiveness of road safety education : a literature review.

    Dragutinovic, N. & Twisk, D.A.M.

    2007-01-01

    This literature review of traffic education programmes addresses the current practice in evaluation research, the effectiveness of programmes and their constituting components and the differences and similarities with other fields of education. The study leads to a number of conclusions which can be

  6. A Review of Digital Addiction: A Call for Safety Education

    Rugai, Joseph; Hamiliton-Ekeke, Joy-Telu

    2016-01-01

    In reviewing digital addiction, this paper recognized that digital technology has been useful in various spheres of life and the reach is undeniable, with an "average" user spending long hours on their phone or online daily. These hours increase as new applications are released by various technological companies. The demands of modern…

  7. A systematic review of the safety climate intervention literature: Past trends and future directions.

    Lee, Jin; Huang, Yueng-Hsiang; Cheung, Janelle H; Chen, Zhuo; Shaw, William S

    2018-04-26

    Safety climate represents the meaningfulness of safety and how safety is valued in an organization. The contributions of safety climate to organizational safety have been well documented. There is a dearth of empirical research, however, on specific safety climate interventions and their effectiveness. The present study aims at examining the trend of safety climate interventions and offering compiled information for designing and implementing evidence-based safety climate interventions. Our literature search yielded 384 titles that were inspected by three examiners. Using a stepwise process that allowed for assessment of interobserver agreement, 19 full articles were selected and reviewed. Results showed that 10 out of the 19 articles (52.6%) were based on a quasi-experimental pre- and postintervention design, whereas 42.1% (n = 8) studies were based on a mixed-design approach (including both between- and within-subject design). All interventions in these 19 studies involved either safety-/health-related communication or education/training. Improvement of safety leadership was also a common component of safety climate interventions. According to the socio-technical systems classification of intervention strategies, all studies were categorized as interventions focusing on improving organizational and managerial structure as well as the personnel subsystem; four of them also aimed at improving technological aspects of work, and five of them aimed at improving the physical work subsystem. In general, a vast majority of the studies (89.5%, n = 17) showed a statistically significant improvement in safety climate across their organizations postintervention. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  8. A review of the probabilistic safety assessment application to the TR-2 research reactor

    Goektepe, G.; Adalioglu, U.; Anac, H.; Sevdik, B.; Menteseoglu, S.

    2001-01-01

    A review of the Probabilistic Safety Assessment (PSA) to the TR-2 Research Reactor is presented. The level 1 PSA application involved: selection of accident initiators, mitigating functions and system definitions, event tree constructions and quantification, fault tree constructions and quantification, human reliability, component failure data base development, dependent failure analysis. Each of the steps of the analysis given above is reviewed briefly with highlights from the selected results. PSA application is found to be a practical tool for research reactor safety due to intense involvement of human interactions in an experimental facility. Insights gained from the application of PSA methodology to the TR-2 research reactor led to a significant safety review of the system

  9. Idaho National Laboratory Integrated Safety Management System 2011 Effectiveness Review and Declaration Report

    Farren Hunt

    2011-12-01

    Idaho National Laboratory (INL) performed an annual Integrated Safety Management System (ISMS) effectiveness review per 48 Code of Federal Regulations (CFR) 970.5223-1, 'Integration of Environment, Safety and Health into Work Planning and Execution.' The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and helped identify target areas for focused improvements and assessments for fiscal year (FY) 2012. The information presented in this review of FY 2011 shows that the INL has performed many corrective actions and improvement activities, which are starting to show some of the desired results. These corrective actions and improvement activities will continue to help change culture that will lead to better implementation of defined programs, resulting in moving the Laboratory's performance from the categorization of 'Needs Improvement' to the desired results of 'Effective Performance.'

  10. Panel Resource Management (PRM) Implementation and Effects within Safety Review Panel Settings and Dynamics

    Taylor, Robert W.; Nash, Sally K.

    2007-01-01

    While technical training and advanced degree's assure proficiency at specific tasks within engineering disciplines, they fail to address the potential for communication breakdown and decision making errors familiar to multicultural environments where language barriers, intimidating personalities and interdisciplinary misconceptions exist. In an effort to minimize these pitfalls to effective panel review, NASA's lead safety engineers to the ISS Safety Review Panel (SRP), and Payload Safety Review Panel (PSRP) initiated training with their engineers, in conjunction with the panel chairs, and began a Panel Resource Management (PRM) program. The intent of this program focuses on the ability to reduce the barriers inhibiting effective participation from all panel attendees by bolstering participants confidence levels through increased communication skills, situational awareness, debriefing, and a better technical understanding of requirements and systems.

  11. Fuel safety criteria technical review - Results of OECD/CSNI/PWG2 Task Force on Fuel Safety Criteria

    Hollasky, N.; Valtonen, K.; Hache, G.; Gross, H.; Bakker, K.; Recio, M.; Bart, G.; Zimmermann, M.; Van Doesburg, W.; Killeen, J.; Meyer, R.O.; Speis, T.

    2000-01-01

    With the advent of advanced fuel and core designs, the adoption of more aggressive operational modes and the implementation of more accurate (best estimate or statistical) design and analysis methods, there is a concern if safety margins have remained adequate. Most - if not all - of the currently existing safety criteria were established during the 60's and early 70's, and verified against experiments with fuel that was available at that time, mostly with unirradiated specimens. Verification was of course performed as designs progressed in later years, however mostly with the aim to be able to prove that these designs adequately complied with existing criteria, and not to establish new limits. The OECD/CSNI/PWG2 Task Force on Fuel Safety Criteria (TFFSC) was therefore given the mandate to technically review the existing fuel safety criteria, focusing on the 'new design' elements (new fuel and core design, cladding materials, manufacturing processes, high burnup, MOX, etc.) introduced by the industry. It should also identify if additional efforts may be required (experimental, analytical) to ensure that the basis for fuel safety criteria is adequate to address the relevant safety issues. In this report, fuel-related criteria are discussed without attempting to categorize them according to event type or risk significance. For each of these 20 criteria, we present a brief description of the criterion as it is used in several applications along with the rationale for having such a criterion. New design elements, such as different cladding materials, higher burnup, and the use of MOX fuels, can affect fuel-related margins and, in some cases, the criteria themselves. Some of the more important effects are mentioned in order to indicate whether the criteria need to be re-evaluated. The discussion may not cover all possible effects, but should be sufficient to identify those criteria that need to be addressed. A summary of these discussions is given in Section 7. As part

  12. IAEA Completes First Ever Corporate Safety Review, at Czech Republic's CEZ

    2013-01-01

    Full text: An international team of nuclear safety experts led by the International Atomic Energy Agency (IAEA) today completed a review of corporate safety performance at CEZ a.s., the largest national electricity company in the Czech Republic. For the first time since the Agency launched its Operational Safety Review Team (OSART) missions in 1982, the team addressed corporate aspects of a company in relation to nuclear safety. The team noted a series of good practices and proposed recommendations to strengthen some safety measures. Assembled at the request of the Government of the Czech Republic, the first ''Corporate OSART'' review, which ran from 30 September to 9 October 2013, addressed corporate aspects necessary to ensure the safe operation of the Dukovany and Temelin Nuclear Power Plants (NPPs). The mission included experts from Finland, France, Romania, USA and the IAEA. OSART services aim to improve operational safety at nuclear facilities by objectively assessing safety performance using the IAEA's Safety Standards and proposing recommendations for improvement where appropriate. The missions serve as a channel to exchange information and experience and provide Member States with good practices. A ''Corporate OSART'' is an OSART mission organized to review those centralized functions of the corporate organization of a utility with multiple nuclear plant sites and conventional plant sites that affect all the operational safety aspects of the nuclear power plants of this utility. ''OSART missions are one of the most important tools of the Agency to ensure better and wider implementation of the IAEA Safety Standards,'' said Denis Flory, Deputy Director General in the IAEA Department of Nuclear Safety and Security. ''Since 1982, we have conducted close to 200 safety review missions around the globe; however, this mission is the first of its kind because we focused on the corporate performance that is a necessity for a safe operation of NPPs,'' Flory added

  13. Review of light water reactor safety through the Three Mile Island accident

    Phung, D.L.

    1984-05-01

    This review of light water reactor safety through the Three Mile Island accident has the purpose of establishing the baseline over which safety achievement post-TMI is assessed, and the need for new reactor designs and business direction is judged. Five major areas of reactor safety pre-TMI are examined: (1) safety philosophy and institutions, (2) reactor design criteria, (3) operational problems, (4) the Rasmussen reactor safety study, and (5) the TMI accident and repercussions. Although nuclear power has made spectacular achievements over the period pre-TMI and although TMI is technically a minor accident, this review concludes that there were basic flaws in the technology and in the manner safety philosophy was conceived and carried out. These flaws included (1) a reactor design that has high core power density, low heat capacity, and low system tolerance to upsets, (2) reactor deployment that had been expedited without extensive operational experience, (3) rules and regulations that had to play catch-up with commercial reactor development, (4) an industry that was fragmented, short-sighted, and tended to rely on the Nuclear Regulatory Commission for safety guidance, (5) information that was not effectively shared, and (6) attention that was inadequate to the human aspects of reactor operation and to public reaction to the specter of a reactor accident, major or minor

  14. International Nuclear Officials Discuss IAEA Peer Reviews of Nuclear Safety Regulations

    2011-01-01

    Full text: Senior nuclear regulators today concluded a Workshop on the Lessons Learned from the IAEA Integrated Regulatory Review Service (IRRS) Missions. The U.S. Nuclear Regulatory Commission (NRC) hosted the workshop, in cooperation with the International Atomic Energy Agency, in Washington, DC, from 26 to 28 October 2011. About 60 senior regulators from 22 IAEA Member States took part in this workshop. The IRRS programme is an international peer review service offered by the IAEA to its Member States to provide an objective evaluation of their nuclear safety regulatory framework. The review is based on the internationally recognized IAEA Safety Standards. ''The United States Nuclear Regulatory Commission was pleased to host the IAEA's IRRS meeting this week. The discussions over the past three days have provided an important opportunity for regulators from many countries to come together to strengthen the international peer review process,'' said U.S. NRC Chairman Gregory B. Jaczko. ''Especially after the Fukushima Daiichi accident, the global community recognizes that IRRS missions fill a vital role in strengthening nuclear safety and security programs around the world, and we are proud to be a part of this important effort.'' The IAEA Action Plan on Nuclear Safety includes actions focused towards strengthening the existing IAEA peer reviews, incorporating lessons learned and improving their effectiveness. The workshop provided a platform for the exchange of information, experience and lessons learned from the IRRS missions, as well as expectations for the IRRS programme for the near future. Further improvements in the planning and implementation of the IRRS missions in the longer term were discussed. A strong commitment of all relevant national authorities to the IRRS programme was identified as a key element of an effective regulatory framework. The conclusions of the workshop will be issued in November 2011 and the main results will be reported to the IAEA

  15. Review of SKB's Safety Assessment SR-Can: Contributions in Support of SKI's and SSI's Review by External Consultants

    2008-03-01

    The Swedish Nuclear Fuel and Waste Management Co (SKB) plans to submit a license application for the construction of a repository for spent nuclear fuel in Sweden 2010. In support of this application SKB will present a safety report, SR-Site, on the repository's long-term safety and radiological consequences. As a preparation for SR-Site, SKB published the preliminary safety assessment SR-Can in November 2006. The purposes were to document a first evaluation of long-term safety for the two candidate sites at Forsmark and Laxemar and to provide feedback to SKB's future programme of work. An important objective of the authorities' review of SR-Can is to provide guidance to SKB on the complete safety reporting for the license application. The authorities have engaged external experts for independent modelling, analysis and review, with the aim to provide a range of expert opinions related to the sufficiency and appropriateness of various aspects of SR-Can. The conclusions and judgments in this report are those of the authors and may not necessarily coincide with those of SKI and SSI. The authorities own review will be published separately (SKI Report 2008:23, SSI Report 2008:04 E). This report compiles contributions from several specific research projects. The separate reviews cover topics regarding the engineered barrier system, the quality assurance, the climate evolution and its effects, and the ecosystems and environmental impacts. All contributions are in English apart from the review concerning ecosystems and environmental impacts, which is presented in Swedish

  16. Uranium Production Safety Assessment Team. UPSAT. An international peer review service for uranium production facilities

    1996-01-01

    The IAEA Uranium Production Safety Assessment Team (UPSAT) programme is designed to assist Member States to improve the safe operation of uranium production facilities. This programme facilitates the exchange of knowledge and experience between team members and industry personnel. An UPSAT mission is an international expert review, conducted outside of any regulatory framework. The programme is implemented in the spirit of voluntary co-operation to contribute to the enhancement of operational safety and practices where it is most effective, at the facility itself. An UPSAT review supplements other facility and regulatory efforts which may have the same objective

  17. ITER final design report, cost review and safety analysis (FDR) and relevant documents

    1999-01-01

    This volume contains the fourth major milestone report and documents associated with its acceptance, review and approval. This ITER Final Design Report, Cost Review and Safety Analysis was presented to the ITER Council at its 13th meeting in February 1998 and was approved at its extraordinary meeting on 25 June 1998. The contents include an outline of the ITER objectives, the ITER parameters and design overview as well as operating scenarios and plasma performance. Furthermore, design features, safety and environmental characteristics and schedule and cost estimates are given

  18. Safety

    2001-01-01

    This annual report of the Senior Inspector for the Nuclear Safety, analyses the nuclear safety at EDF for the year 1999 and proposes twelve subjects of consideration to progress. Five technical documents are also provided and discussed concerning the nuclear power plants maintenance and safety (thermal fatigue, vibration fatigue, assisted control and instrumentation of the N4 bearing, 1300 MW reactors containment and time of life of power plants). (A.L.B.)

  19. The paternal-sex-ratio (PSR) chromosome in natural populations of Nasonia (Hymenoptera Chalcidoidea)

    Beukeboom, L.W.; Werren, J.H.

    2000-01-01

    Selfish genetic elements may be important in promoting evolutionary change. Paternal sex ratio (PSR) is a selfish B chromosome that causes all-male families in the haplodiploid parasitic wasp Nasonia vitripennis, by inducing paternal genome loss in fertilized eggs. The natural distribution and

  20. Test of post-newtonian conservation laws in the binary system PSR 1913+16

    Will, C.M.

    1976-01-01

    Observations that set upper limits on secular changes in the pulsar period and orbital period in the binary system PSR 1913+16 may provide a test of post-Newtonian conservation laws. According to some metric theories of gravitation, the center of mass of a binary system may be accelerated in the direction of the periastron of the orbit because of a violation of post-Newtonian momentum conservation. In the binary system PSR 1913+16, this effect could produce secular changes in both pulsar and orbital periods (changing overall Doppler shift) as large as two parts in 10 6 per year. The size of the effect is proportional to the sine of the angle of periastron, to the difference in the masses of the components of the binary system, and to the combination of parametrized post-Newtonian parameters α 3 +zeta 2 -zeta/subw/. This combination is zero in any theory that predicts conserved total momentum for isolated systems (including general relativity and Brans-Dicke theory). Although solar-system experiments constrain α 3 and zeta/subw/ to be small, no decent direct limit has been placed on zeta 2 . Other possible sources of secular period changes in PSR 1913+16 are discussed and compared with this effect. It is also shown that a breakdown in the equality of active and passive gravitational masses (violation of ''Newton's third law'') leads only to periodic, unobservable orbital effects in a system like PSR 1913+16

  1. The Radio and X-ray Mode-Switching Pulsar PSR B0943+10

    Observations obtained in the last years challenged the widespread notion that rotation-powered neutron stars are steady X-ray emitters. Besides a few allegedly rotation-powered neutron stars that showed 'magnetar-like' variability, a particularly interesting case is that of PSR B0943+10. Recent observations have shown ...

  2. Nuclear safety review for qualification of class 1E motor inside containment for nuclear power stations

    Li Shixin; Wu Qi; Zhang Yunbo; Wu Caixia

    2013-01-01

    In nuclear power plants with pressurized water reactors, the review for class 1E motor inside containment qualification process and documents is an important aspect of nuclear safety equipment review, and the reviewers should make evaluations for the qualification test results in terms of the compliance with standard and regulation, and the consistency with inside containment environment. Firstly, this paper introduces the qualification test of class 1E motor inside containment for nuclear power generating stations, such as aging test and design-basis-event test. Second, there is a discussion about typical problems of review. At last, comparison of IEEE334 with RCC-E is conducted and explored. (authors)

  3. Trends in HFE Methods and Tools and Their Applicability to Safety Reviews

    O' Hara, J.M.; Plott, C.; Milanski, J.; Ronan, A.; Scheff, S.; Laux, L.; and Bzostek, J.

    2009-09-30

    The U.S. Nuclear Regulatory Commission's (NRC) conducts human factors engineering (HFE) safety reviews of applicant submittals for new plants and for changes to existing plants. The reviews include the evaluation of the methods and tools (M&T) used by applicants as part of their HFE program. The technology used to perform HFE activities has been rapidly evolving, resulting in a whole new generation of HFE M&Ts. The objectives of this research were to identify the current trends in HFE methods and tools, determine their applicability to NRC safety reviews, and identify topics for which the NRC may need additional guidance to support the NRC's safety reviews. We conducted a survey that identified over 100 new HFE M&Ts. The M&Ts were assessed to identify general trends. Seven trends were identified: Computer Applications for Performing Traditional Analyses, Computer-Aided Design, Integration of HFE Methods and Tools, Rapid Development Engineering, Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. We assessed each trend to determine its applicability to the NRC's review by considering (1) whether the nuclear industry is making use of M&Ts for each trend, and (2) whether M&Ts reflecting the trend can be reviewed using the current design review guidance. We concluded that M&T trends that are applicable to the commercial nuclear industry and are expected to impact safety reviews may be considered for review guidance development. Three trends fell into this category: Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. The other trends do not need to be addressed at this time.

  4. Trends in HFE Methods and Tools and Their Applicability to Safety Reviews

    O'Hara, J.M.; Plott, C.; Milanski, J.; Ronan, A.; Scheff, S.; Laux, L.; Bzostek, J.

    2009-01-01

    The U.S. Nuclear Regulatory Commission's (NRC) conducts human factors engineering (HFE) safety reviews of applicant submittals for new plants and for changes to existing plants. The reviews include the evaluation of the methods and tools (M and T) used by applicants as part of their HFE program. The technology used to perform HFE activities has been rapidly evolving, resulting in a whole new generation of HFE M and Ts. The objectives of this research were to identify the current trends in HFE methods and tools, determine their applicability to NRC safety reviews, and identify topics for which the NRC may need additional guidance to support the NRC's safety reviews. We conducted a survey that identified over 100 new HFE M and Ts. The M and Ts were assessed to identify general trends. Seven trends were identified: Computer Applications for Performing Traditional Analyses, Computer-Aided Design, Integration of HFE Methods and Tools, Rapid Development Engineering, Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. We assessed each trend to determine its applicability to the NRC's review by considering (1) whether the nuclear industry is making use of M and Ts for each trend, and (2) whether M and Ts reflecting the trend can be reviewed using the current design review guidance. We concluded that M and T trends that are applicable to the commercial nuclear industry and are expected to impact safety reviews may be considered for review guidance development. Three trends fell into this category: Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. The other trends do not need to be addressed at this time.

  5. Multimorbidity and Patient Safety Incidents in Primary Care: A Systematic Review and Meta-Analysis

    Panagioti, Maria; Stokes, Jonathan; Esmail, Aneez; Coventry, Peter; Cheraghi-Sohi, Sudeh; Alam, Rahul; Bower, Peter

    2015-01-01

    Background Multimorbidity is increasingly prevalent and represents a major challenge in primary care. Patients with multimorbidity are potentially more likely to experience safety incidents due to the complexity of their needs and frequency of their interactions with health services. However, rigorous syntheses of the link between patient safety incidents and multimorbidity are not available. This review examined the relationship between multimorbidity and patient safety incidents in primary care. Methods We followed our published protocol (PROSPERO registration number: CRD42014007434). Medline, Embase and CINAHL were searched up to May 2015. Study design and quality were assessed. Odds ratios (OR) and 95% confidence intervals (95% CIs) were calculated for the associations between multimorbidity and two categories of patient safety outcomes: ‘active patient safety incidents’ (such as adverse drug events and medical complications) and ‘precursors of safety incidents’ (such as prescription errors, medication non-adherence, poor quality of care and diagnostic errors). Meta-analyses using random effects models were undertaken. Results Eighty six relevant comparisons from 75 studies were included in the analysis. Meta-analysis demonstrated that physical-mental multimorbidity was associated with an increased risk for ‘active patient safety incidents’ (OR = 2.39, 95% CI = 1.40 to 3.38) and ‘precursors of safety incidents’ (OR = 1.69, 95% CI = 1.36 to 2.03). Physical multimorbidity was associated with an increased risk for active safety incidents (OR = 1.63, 95% CI = 1.45 to 1.80) but was not associated with precursors of safety incidents (OR = 1.02, 95% CI = 0.90 to 1.13). Statistical heterogeneity was high and the methodological quality of the studies was generally low. Conclusions The association between multimorbidity and patient safety is complex, and varies by type of multimorbidity and type of safety incident. Our analyses suggest that multimorbidity

  6. Review of Leadership for Safety and Role in abnormal situation

    Kim, Chang Rae; Yoon, Myung Hyun; Choi, Young Sung

    2017-01-01

    In the wake of an event in Fukushima, the importance of leadership that is able to increase responses and retain safety in unexpected accidents and disasters is emerged and it is increased interest in a systemic approach to leadership. Experts of international community urge to pay attention to humans and organizations because decision making, understanding the situation and communications affect the progress of accident significantly in the extreme condition. The individual as a leader should be able to carry out a central role to coordinate in the central, to take responsibility for ethical decisions, to earn the trust of employees by taking initiative, and to order by using empirical knowledge. However it is not desirable to limit the flexible response of the organization to the individual role of the leader. It should also be emphasized that leadership is a characteristic of the organization that is required by all levels in order to achieve the goal and it is important to develop the ability in organizational level. Therefore it is necessary to constantly modify situational awareness while interacting with the entire organization and all employees must carry out as a leader in the ever-changing field because the leader's recognition ability is limited. Also, leadership can function only through followership in ethical situations.

  7. Bitter melon (Momordica charantia): a review of efficacy and safety.

    Basch, Ethan; Gabardi, Steven; Ulbricht, Catherine

    2003-02-15

    The pharmacology, clinical efficacy, adverse effects, drug interactions, and place in therapy of bitter melon are described. Bitter melon (Momordica charantia) is an alternative therapy that has primarily been used for lowering blood glucose levels in patients with diabetes mellitus. Components of bitter melon extract appear to have structural similarities to animal insulin. Antiviral and antineoplastic activities have also been reported in vitro. Four clinical trials found bitter melon juice, fruit, and dried powder to have a moderate hypoglycemic effect. These studies were small and were not randomized or double-blind, however. Reported adverse effects of bitter melon include hypoglycemic coma and convulsions in children, reduced fertility in mice, a favism-like syndrome, increases in gamma-glutamyltransferase and alkaline phosphatase levels in animals, and headaches. Bitter melon may have additive effects when taken with other glucose-lowering agents. Adequately powered, randomized, placebo-controlled trials are needed to properly assess safety and efficacy before bitter melon can be routinely recommended. Bitter melon may have hypoglycemic effects, but data are not sufficient to recommend its use in the absence of careful supervision and monitoring.

  8. Safety of Levetiracetam in Paediatrics: A Systematic Review.

    Oluwaseun Egunsola

    Full Text Available To identify adverse events (AEs associated with Levetiracetam (LEV in children.Databases EMBASE (1974-February 2015 and Medline (1946-February 2015 were searched for articles in which paediatric patients (≤18 years received LEV treatment for epilepsy. All studies with reports on safety were included. Studies involving adults, mixed age population (i.e. children and adults in which the paediatric subpopulation was not sufficiently described, were excluded. A meta-analysis of the RCTs was carried out and association between the commonly reported AEs or treatment discontinuation and the type of regimen (polytherapy or monotherapy was determined using Chi2 analysis.Sixty seven articles involving 3,174 paediatric patients were identified. A total of 1,913 AEs were reported across studies. The most common AEs were behavioural problems and somnolence, which accounted for 10.9% and 8.4% of all AEs in prospective studies. 21 prospective studies involving 1120 children stated the number of children experiencing AEs. 47% of these children experienced AEs. Significantly more children experienced AEs with polytherapy (64% than monotherapy (22% (p<0.001. Levetiracetam was discontinued in 4.5% of all children on polytherapy and 0.9% on monotherapy (p<0.001, the majority were due to behavioural problems.Behavioural problems and somnolence were the most prevalent adverse events to LEV and the most common causes of treatment discontinuation. Children on polytherapy have a greater risk of adverse events than those receiving monotherapy.

  9. Application of proximal surrogate indicators for safety evaluation: A review of recent developments and research needs

    S.M. Sohel Mahmud

    2017-12-01

    Full Text Available Although there have been a number of recent reviews on the use of traffic conflict techniques (TCTs, none have focused on the use of proximal surrogate indicators. This paper comprehensively reviews the development and application of proximal surrogate safety indicators to address this gap. There is a particular focus on more recent advancements in the application of such indicators. For each of the main indicators reviewed, the paper provides a synthesis of the main guiding principles, as well as the most prominent features, including critical or threshold values used in the past. In addition, the main advantages and disadvantages of the reviewed indicators are highlighted. Finally, a number of research gaps are identified together with recommendations for potentially useful avenues of future research. Keywords: Safety evaluation, Traffic conflict, Surrogate, Proximal, Indicators

  10. International Expert Review of Sr-Can: Safety Assessment Methodology - External review contribution in support of SSI's and SKI's review of SR-Can

    Sagar, Budhi; Egan, Michael; Roehlig, Klaus-Juergen; Chapman, Neil; Wilmot, Roger

    2008-03-01

    In 2006, SKB published a safety assessment (SR-Can) as part of its work to support a licence application for the construction of a final repository for spent nuclear fuel. The purposes of the SR-Can project were stated in the main project report to be: 1. To make a first assessment of the safety of potential KBS-3 repositories at Forsmark and Laxemar to dispose of canisters as specified in the application for the encapsulation plant. 2. To provide feedback to design development, to SKB's research and development (R and D) programme, to further site investigations and to future safety assessments. 3. To foster a dialogue with the authorities that oversee SKB's activities, i.e. the Swedish Nuclear Power Inspectorate, SKI, and the Swedish Radiation Protection Authority, SSI, regarding interpretation of applicable regulations, as a preparation for the SR-Site project. To help inform their review of SKB's proposed approach to development of the longterm safety case, the authorities appointed three international expert review teams to carry out a review of SKB's SR-Can safety assessment report. Comments from one of these teams - the Safety Assessment Methodology (SAM) review team - are presented in this document. The SAM review team's scope of work included an examination of SKB's documentation of the assessment ('Long-term safety for KBS-3 Repositories at Forsmark and Laxemar - a first evaluation' and several supporting reports) and hearings with SKB staff and contractors, held in March 2007. As directed by SKI and SSI, the SAM review team focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology is likely to be suitable for use in the future SR-Site and to assess its consistency with the Swedish regulatory framework. No specific evaluation of long-term safety or site acceptability was undertaken by any of the review teams. SKI and SSI's Terms of Reference for the SAM review team requested that consideration be given

  11. [Evidence-based effectiveness of road safety interventions: a literature review].

    Novoa, Ana M; Pérez, Katherine; Borrell, Carme

    2009-01-01

    Only road safety interventions with scientific evidence supporting their effectiveness should be implemented. The objective of this study was to identify and summarize the available evidence on the effectiveness of road safety interventions in reducing road traffic collisions, injuries and deaths. All literature reviews published in scientific journals that assessed the effectiveness of one or more road safety interventions and whose outcome measure was road traffic crashes, injuries or fatalities were included. An exhaustive search was performed in scientific literature databases. The interventions were classified according to the evidence of their effectiveness in reducing road traffic injuries (effective interventions, insufficient evidence of effectiveness, ineffective interventions) following the structure of the Haddon matrix. Fifty-four reviews were included. Effective interventions were found before, during and after the collision, and across all factors: a) the individual: the graduated licensing system (31% road traffic injury reduction); b) the vehicle: electronic stability control system (2 to 41% reduction); c) the infrastructure: area-wide traffic calming (0 to 20%), and d) the social environment: speed cameras (7 to 30%). Certain road safety interventions are ineffective, mostly road safety education, and others require further investigation. The most successful interventions are those that reduce or eliminate the hazard and do not depend on changes in road users' behavior or on their knowledge of road safety issues. Interventions based exclusively on education are ineffective in reducing road traffic injuries.

  12. A Systematic Review of the Use of Social Media for Food Safety Risk Communication.

    Overbey, Katie N; Jaykus, Lee-Ann; Chapman, Benjamin J

    2017-09-01

    This article covers the current published literature related to the use of social media in food safety and infectious disease communication. The aim was to analyze literature recommendations and draw conclusions about how best to utilize social media for food safety risk communication going forward. A systematic literature review was conducted, and 24 articles were included for analysis. The inclusion criteria were (i) original peer-reviewed articles and (ii) primary focus on communication through social media about food safety and/or infectious diseases. Studies were coded for themes about social media applications, benefits, limitations, and best practices. Trust and personal beliefs were important drivers of social media use. The wide reach, immediacy, and information gathering capacities of social media were frequently cited benefits. Suggestions for social media best practices were inconsistent among studies, and study designs were highly variable. More evidence-based suggestions are needed to better establish guidelines for social media use in food safety and infectious disease risk communication. The information gleaned from this review can be used to create effective messages for shaping food safety behaviors.

  13. Preliminary standard review guide for Environmental Restoration/Decontamination and Decommissioning safety analyses

    Ellingson, D.R.

    1993-06-01

    The review guide is based on the shared experiences, approaches, and philosophies of the Environmental Restoration/Decontamination and Decommissioning (ER/D ampersand D) subgroup members. It is presented in the form of a review guide to maximize the benefit to both the safety analyses practitioner and reviewer. The guide focuses on those challenges that tend to be unique to ER/D ampersand D cleanup activities. Some of these experiences, approaches, and philosophies may find application or be beneficial to a broader spectrum of activities such as terminal cleanout or even new operations. Challenges unique to ER/D ampersand D activities include (1) consent agreements requiring activity startup on designated dates; (2) the increased uncertainty of specific hazards; and (3) the highly variable activities covered under the broad category of ER/D ampersand D. These unique challenges are in addition to the challenges encountered in all activities; e.g., new and changing requirements and multiple interpretations. The experiences in approaches, methods, and solutions to the challenges are documented from the practitioner and reviewer's perspective, thereby providing the viewpoints on why a direction was taken and the concerns expressed. Site cleanup consent agreements with predetermined dates for restoration activity startup add the dimension of imposed punitive actions for failure to meet the date. Approval of the safety analysis is a prerequisite to startup. Actions that increase expediency are (1) assuring activity safety; (2) documenting that assurance; and (3) acquiring the necessary approvals. These actions increase the timeliness of startup and decrease the potential for punitive action. Improvement in expediency has been achieved by using safety analysis techniques to provide input to the line management decision process rather than as a review of line management decisions. Expediency is also improved by sharing the safety input and resultant decisions with

  14. Involving patients in patient safety programmes: A scoping review and consensus procedure by the LINNEAUS collaboration on patient safety in primary care

    Trier, H.; Valderas, J.M.; Wensing, M.; Martin, H.M.; Egebart, J.

    2015-01-01

    BACKGROUND: Patient involvement has only recently received attention as a potentially useful approach to patient safety in primary care. OBJECTIVE: To summarize work conducted on a scoping review of interventions focussing on patient involvement for patient safety; to develop consensus-based

  15. Effectiveness of public health interventions in food safety: a systematic review.

    Campbell, M E; Gardner, C E; Dwyer, J J; Isaacs, S M; Krueger, P D; Ying, J Y

    1998-01-01

    To summarize evidence on the effectiveness of public health interventions regarding food safety at restaurants, institutions, homes and other community-based settings. This systematic review of published and unpublished studies involved a comprehensive literature search, screening for relevance, quality assessment of relevant studies, data extraction and synthesis. The interventions identified in 15 studies included in this review were grouped into three categories: inspections, food handler training, and community-based education. The evidence suggests that: routine inspection (at least once per year) of food service premises is effective in reducing the risk of foodborne illness; food handler training can improve the knowledge and practices of food handlers; and selected community-based education programs can increase public knowledge of food safety. There is some evidence for the effectiveness of multiple public health interventions on food safety. Future research needs include evaluation of HACCP and community-based education programs.

  16. Accidents in industrial radiography and lessons to be learned. A review of IAEA Safety Report

    Modupe, M.S.; Oresegun, O.

    1998-01-01

    This IAEA Safety Report Series publication is the result of a review of a large selection of accidents in industrial radiography which Regulatory Authorities, professional associations and scientific journals have reported. The review's objective was to draw lessons from the initiating events of the accidents, contributing factors and the consequences. A small, representative selection of accident descriptions is used to illustrate the primary causes of radiography accidents and a set of recommendations to prevent recurrence of such accidents or to mitigate the consequences of those that do occur is provided. By far the most common primary cause of over-exposure was 'Failure to follow operational procedures' and specifically failure to perform radiation monitoring to locate the position of the source. The information in the Safety Report is intended for use by Regulatory Authorities, operating organizations, workers manufacturers and client organizations having responsibilities for radiation protection and safety in industrial radiography. (author)

  17. SKI's and SSI's review of SKB's safety report SR-Can

    Dverstorp, Bjoern; Stroemberg, Bo

    2008-03-01

    This report summarises SKI's and SSI's joint review of the Swedish Nuclear Fuel and Waste Management Co's (SKB) safety report SR-Can (SKB TR-06-09). SR-Can is the first assessment of post-closure safety for a KBS-3 spent nuclear fuel repository at the candidate sites Forsmark and Laxemar, respectively. The analysis builds on data from the initial stage of SKB's surface-based site investigations and on data from full-scale manufacturing and testing of buffer and copper canisters. SR-Can can be regarded as a preliminary version of the safety report that will be required in connection with SKB's planned licence application for a final repository in late 2009. The main purpose of the authorities' review is to provide feedback to SKB on their safety reporting as part of the pre-licensing consultation process. However, SR-Can is not part of the formal licensing process. In support of the authorities' review three international peer review teams were set up to make independent reviews of SR-Can from three perspectives, namely integration of site data, representation of the engineered barriers and safety assessment methodology, respectively. Further, several external experts and consultants have been engaged to review detailed technical and scientific issues in SR-Can. The municipalities of Oesthammar and Oskarshamn where SKB is conducting site investigations, as well NGOs involved in SKB's programme, have been invited to provide their views on SR-Can as input to the authorities' review. Finally, the authorities themselves, and with the help of consultants, have used independent models to reproduce part of SKB's calculations and to make complementary calculations. All supporting review documents are published in SKI's and SSI's report series. The main findings of the review are: -SKB's safety assessment methodology is overall in accordance with applicable regulations, but part of the methodology needs to be further developed for the licence application. -SKB's quality

  18. A review of tsunami simulation activities for NPPs safety

    Sharma, Pavan K.

    2011-01-01

    The tsunami generated on December 26, 2004 due to Sumatra earthquake of magnitude 9.3 resulted in inundation at the various coastal sites of India. The site selection and design of Indian nuclear power plants demand the evaluation of run up and the structural barriers for the coastal plants: Besides it is also desirable to evaluate the early warning system for tsunamigenic earthquakes. The tsunamis originate from submarine faults, underwater volcanic activities, sub-aerial landslides impinging on the sea and submarine landslides. In case of a submarine earthquake-induced tsunami the wave is generated in the fluid domain due to displacement of the seabed. There are three phases of tsunami: generation, propagation, and run-up. Reactor Safety Division (RSD) of Bhabha Atomic Research Centre (BARC), Trombay has initiated computational simulation for all the three phases of tsunami source generation, its propagation and finally run up evaluation for the protection of public life, property and various industrial infrastructures located on the coastal regions of India. These studies could be effectively utilized for design and implementation of early warning system for coastal region of the country apart from catering to the needs of Indian nuclear installations. This paper presents some results of tsunami waves based on finite difference numerical approaches with shallow water wave theory. The present paper evaluate the results of various simulation i.e. Single fault Sumatra model, four and five fault Sumatra Model, Nias insignificant tsunami and also some parametric studies results for tsunami waring system scenario generation. A study is carried for the tsunami due to Sumatra earthquake in 2004 with TUNAMI-N2 software. Bathymetry data available from the National Geophysical Data Center was used for this study. The single fault and detailed four and five fault data were used to calculate sea surface deformations which were subsequently used as initial conditions for

  19. Review on the assessment of safety and risks

    Leiber, C.O. [Fraunhofer-Institut fuer Chemische Technologie (ICT), Pfinztal (Germany); Doherty, R.M. [Naval Surface Warfare Center, Indian Head, MD (United States)

    2001-12-01

    Historically explosion accidents are linked with energetic materials. There is the further belief, that the proneness to accidents-and their severity-is linked with the sensitivity of these explosives. Consequently there exist seemingly very insensitive materials for which it is believed that their accidental explosion can be ignored, so that safety distances can be reduced to those that apply to materials for which the hazard is assumed to be mass fire rather than mass detonation. Evidence is presented here that shows these assumptions to be invalid. Reports of explosion accidents are gathered here for substances that are not generally considered to be explosives (non UN-class 1 substances, like ammonium nitrate (AN), neat alkali metal chlorates, and even hypochlorites and nitromethane). In most of these cases the proneness of accidents had not been foreseen by testing. The basic explosion mechanisms are of a more general nature than simply those that apply to high explosives. Explosion is not solely a matter of energy, but of any physical power conversion. In order to prove this, a survey of explosion events is given: Natural events, like the impacts of celestial bodies and volcanic erptions. Fuel/liquid interactions in nature are industrial risks too, which occur at very different occasions and sites: Cellulose processing, the oil industry, foundries, power stations, explosions of hot cinders, chemical processing, fire extinguishing, and (most common) in the kitchen, and (most catastrophic) in nuclear reactors. Explosions of similar type are Hydraulic Transients, Bubble resonance explosions with the possibility of associated chemical room explosions (BLEVE), Rollovers. Second order effects are sorption/desorption resonance explosions, which most powerful also occur in nature (Nios Lake (CO{sub 2}-release), Kivu Lake, Monoun Lake, 1984, Tanganjika Lake, all in Africa, and the Ocracoke in the Gulf of Mexico (CH{sub 4}-release))-and at the lowest end shaken

  20. Systematic Review of Kinship Care Effects on Safety, Permanency, and Well-Being Outcomes

    Winokur, Marc A.; Holtan, Amy; Batchelder, Keri E.

    2018-01-01

    Objective: Children in out-of-home placements typically display more educational, behavioral, and psychological problems than do their peers. This systematic review evaluated the effect of kinship care placement compared to foster care placement on the safety, permanency, and well-being of children removed from the home for maltreatment. Methods:…

  1. 75 FR 30859 - Meeting of the Public Safety Officer Medal of Valor Review Board

    2010-06-02

    ... INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out those advisory functions... participate must register at least seven (7) days in advance of the meeting/conference call by contacting Mr.... Anyone requiring special accommodations should contact Mr. Joy at least seven (7) days in advance of the...

  2. 76 FR 37375 - Meeting of the Public Safety Officer Medal of Valor Review Board

    2011-06-27

    ... INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out those advisory functions... who wish to participate must register at least seven (7) days in advance of the meeting/conference... registration. Anyone requiring special accommodations should contact Mr. Joy at least seven (7) days in advance...

  3. Use of mobile phones while driving : effects on road safety : a literature review.

    Dragutinovic, N. & Twisk, D.A.M.

    2006-01-01

    The use of mobile phones while driving has become a road safety concern and has been the focus of various behavioural studies. This literature review analyses studies published in the period 1999-2005, and include simulator studies, closed-track studies and studies on the real road. Although studies

  4. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  5. Promoting occupational safety and health through the supply chain Literature review

    Ustailieva, E.; Starren, A.; Eeckelaert, L.; Lopes Nunes, I.; Hauke, A.

    2012-01-01

    This report sheds light on occupational safety and health (OSH) within complex supply chain networks. Based on a literature, policy and case study review it attempts to give an overview of how OSH can be managed and promoted through the supply chain, and which drivers, incentives and instruments

  6. Speaking up for patient safety by hospital-based health care professionals: a literature review.

    Okuyama, A.; Wagner, C.; Bijnen, B.

    2014-01-01

    Background: Speaking up is important for patient safety, but often, health care professionals hesitate to voice concerns. Understanding the influencing factors can help to improve speaking-up behaviour and team communication. This review focused on health care professionals’ speaking-up behaviour

  7. Speaking up for patient safety by hospital-based health care professionals: a literature review

    Okuyama, A.; Wagner, C.; Bijnen, A.B.

    2014-01-01

    Background: Speaking up is important for patient safety, but often, health care professionals hesitate to voice concerns. Understanding the influencing factors can help to improve speaking-up behaviour and team communication. This review focused on health care professionals' speaking-up behaviour

  8. Preparations for the 1994 OSART [operational safety review] at Hunterston Power Station

    Moir, I.A.

    1993-01-01

    The International Atomic Energy Agency have accepted an invitation from the Scottish Office to carry out an Operational Safety Review at Hunterston Power Station in April 1994. This paper outlines the preparations being undertaken by Scottish Nuclear Limited to ensure the standards set by the International Atomic Energy Agency are met. (author)

  9. Conduct and results of the Interagency Nuclear Safety Review Panel's evaluation of the Ulysses space mission

    Sholtis, J.A. Jr.; Gray, L.B.; Huff, D.A.; Klug, N.P.; Winchester, R.O.

    1991-01-01

    The recent 6 October 1990 launch and deployment of the nuclear-powered Ulysses spacecraft from the Space Shuttle Discovery culminated an extensive safety review and evaluation effort by the Interagency Nuclear Safety Review Panel (INSRP). After more than a year of detailed independent review, study, and analysis, the INSRP prepared a Safety Evaluation Report (SER) on the Ulysses mission, in accordance with Presidential Directive-National Security Council memorandum 25. The SER, which included a review of the Ulysses Final Safety Analysis Report (FSAR) and an independent characterization of the mission risks, was used by the National Aeronautics and Space Administration (NASA) in its decision to request launch approval as well as by the Executive Office of the President in arriving at a launch decision based on risk-benefit considerations. This paper provides an overview of the Ulysses mission and the conduct as well as the results of the INSRP evaluation. While the mission risk determined by the INSRP in the SER was higher than that characterized by the Ulysses project in the FSAR, both reports indicated that the radiological risks were relatively small. In the final analysis, the SER proved to be supportive of a positive launch decision. The INSRP evaluation process has demonstrated its effectiveness numerous times since the 1960s. In every case, it has provided the essential ingredients and perspective to permit an informed launch decision at the highest level of our Government

  10. A review of the literature on preventive occupational health and safety activities in small enterprises

    Hasle, Peter; Limborg, Hans Jørgen

    2006-01-01

    The scientific literature regarding preventive occupational health and safety activities in small enterprises has been reviewed in order to identify effective preventive approaches and to develop a future research strategy. During the last couple of years, there has been a significant increase...

  11. A review of case studies evaluating economic incentives to promote occupational safety and health

    Elsler, D.; Treutlein, D.; Rydlewska, I.; Frusteri, L.; Krüger, H.; Veerman, T.; Eeckelaert, L.; Roskams, N.; Broek, K. van den; Taylor, T.N.

    2010-01-01

    Objectives: In many European countries, external economic incentives are discussed as a policy instrument to promote occupational safety and health (OSH) in enterprises. This narrative case study review aims to support policy-makers in organizations providing such incentives by supplying information

  12. Learning from aviation to improve safety in the operating room - a systematic literature review

    L.S.G.L. Wauben; J.F. Lange (Johan); R.H.M. Goossens (Richard)

    2012-01-01

    textabstractLessons learned from other high-risk industries could improve patient safety in the operating room (OR). This review describes similarities and differences between high-risk industries and describes current methods and solutions within a system approach to reduce errors in the OR. PubMed

  13. IAEA Operational Safety Team Reviews Saint-Alban Nuclear Power Plant, France

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed safety practices at France's Saint-Alban Nuclear Power Plant (NPP) and has highlighted a set of strong practices as well as a series of recommendations to reinforce them. The IAEA assembled the team at the request of the Government of France to conduct an Operational Safety Review (OSART) of the Saint-Alban NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review from 20 September to 6 October 2010. The team was made up of experts from Belgium, Canada, the Czech Republic, Germany, Lithuania, the Netherlands, Slovakia, Sweden and the USA. An OSART mission is designed to review programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Saint-Alban conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely are under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: A safety guideline for outages; The use of remote video surveillance of fuel inspection and handling activities; A motivational tool for plant staff regarding the benefits of operating experience and associated corrective actions; and Use of a sophisticated key control system

  14. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  15. IRIS guidelines. 2014 ed. Integrated Review of Infrastructure for Safety (IRIS) for self-assessment when establishing the safety infrastructure for a nuclear power programme

    2014-01-01

    The IAEA safety standards reflect an international consensus on what constitutes a high level of safety for protecting people and the environment, and therefore represent what all Member States should achieve, whilst recognizing the ultimate responsibility of each State to ensure safety when implementing a nuclear power programme. IAEA Safety Standards Series No. SSG-16, entitled Establishing the Safety Infrastructure for a Nuclear Power Programme was published in order to provide recommendations, presented in the form of sequential actions, on meeting safety requirements progressively during the initial three phases of the development of safety, as described in INSAG-22, Nuclear Safety Infrastructure for a National Nuclear Power Programme Supported by the IAEA Fundamental Safety Principles. To that end, the 200 safety related actions, which are proposed by SSG-16, constitute a roadmap to establish a foundation for promoting a high level of safety over the entire lifetime of the nuclear power plant. These actions reflect international consensus on good practice in order to achieve full implementation of IAEA safety standards. The IAEA has developed a methodology and tool, the Integrated Review of Infrastructure for Safety (IRIS), to assist States in undertaking self-assessment with respect to SSG-16 recommendations when establishing the safety infrastructure for a nuclear power programme, and to develop an action plan for improvement. The IRIS methodology and the associated tool are fully compatible with the IAEA safety standards and are also used, when appropriate, in the preparation of review missions, such as the Integrated Regulatory Review Service and advisory missions. The present guidelines describe the IRIS methodology for self-assessment against SSG-16 recommendations. Through IRIS implementation, every organization concerned with nuclear safety may gain proper awareness and engage in a continuous progressive process to develop the effective national

  16. New graduate registered nurses' knowledge of patient safety and practice: A literature review.

    Murray, Melanie; Sundin, Deborah; Cope, Vicki

    2018-01-01

    To critically appraise available literature and summarise evidence pertaining to the patient safety knowledge and practices of new graduate registered nurses. Responsibility for patient safety should not be limited to the practice of the bedside nurses, rather the responsibility of all in the healthcare system. Previous research identified lapses in safety across the health care, more specifically with new practitioners. Understanding these gaps and what may be employed to counteract them is vital to ensuring patient safety. A focused review of research literature. The review used key terms and Boolean operators across a 5-year time frame in CINAHL, Medline, psycINFO and Google Scholar for research articles pertaining to the area of enquiry. Eighty-four articles met the inclusion criteria, 39 discarded due to irrelevant material and 45 articles were included in the literature review. This review acknowledges that nursing has different stages of knowledge and practice capabilities. A theory-practice gap for new graduate registered nurses exists, and transition to practice is a key learning period setting new nurses on the path to becoming expert practitioners. Within the literature, there was little to no acknowledgement of patient safety knowledge of the newly registered nurse. Issues raised in the 1970s remain a concern for today's new graduate registered nurses. Research has recognised several factors affecting transition from nursing student to new graduate registered nurse. These factors are leaving new practitioners open to potential errors and risking patient safety. Understanding the knowledge of a new graduate registered nurse upon entering clinical practice may assist in organisations providing appropriate clinical and theoretical support to these nurses during their transition. © 2017 John Wiley & Sons Ltd.

  17. Standard Review Plan for the review of safety analysis reports for nuclear power plants, updates. Irregular repts

    1980-01-01

    The Standard Review Plan (SRP) is prepared for the guidance of staff reviewers in the Office of Nuclear Reactor Regulation in performing safety reviews of applications to construct or operate nuclear power plants. The principal purpose of the SRP is to assure the quality and uniformity of staff reviews, and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. It is also a purpose of the SRP to make information about regulatory matters widely available and to improve communication and understanding of the staff review process by interested members of the public and the nuclear power industry. The Standard Review Plan is written so as to cover a variety of site conditions and plant designs. Each section is written to provide the complete procedure and all acceptance criteria for all of the areas of review pertinent to that section. However, for any given application, the staff reviewers may select and emphasize particular aspects of each SRP section as is appropriate for the application

  18. Mechanics of aerosols in nuclear reactor safety: a review

    Loyalka, S.K.

    1983-01-01

    Although the estimated public risks from nuclear reactors are not high, a significant fraction of these arises from the accident sequences that lead to severe core damage. Calculation of release fractions of the core radioactive inventories for such accidents requires an understanding of the evolution of aerosols in primary coolant systems and reactor containment. The state-of-the-art in the mechanics of a single aerosol particle is reviewed and available work on coagulation of two aerosol particles is discussed. Progress in kinetic theory descriptions and experimental works is described and directions of future work are noted. The General Dynamic Equation for the aerosol distribution is considered, and several forms of this for conditions of interest are noted. Methods of solution that are discussed include analytical techniques, similarity transforms, moments methods and numerical techniques. Computer programs that have been developed in the past few years are also discussed, and their capabilities and limitations are noted. Finally, the comparison of computed results with the available experimental data is discussed, and needs for future research are emphasized. (author)

  19. Driving Safety after Spinal Surgery: A Systematic Review.

    Alhammoud, Abduljabbar; Alkhalili, Kenan; Hannallah, Jack; Ibeche, Bashar; Bajammal, Sohail; Baco, Abdul Moeen

    2017-04-01

    This study aimed to assess driving reaction times (DRTs) after spinal surgery to establish a timeframe for safe resumption of driving by the patient postoperatively. The MEDLINE and Google Scholar databases were analyzed according to the PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analysis) Statement for clinical studies that investigated changes in DRTs following cervical and lumbar spinal surgery. Changes in DRTs and patients' clinical presentation, pathology, anatomical level affected, number of spinal levels involved, type of intervention, pain level, and driving skills were assessed. The literature search identified 12 studies that investigated postoperative DRTs. Six studies met the inclusion criteria; five studies assessed changes in DRT after lumbar spine surgery and two studies after cervical spina surgery. The spinal procedures were selective nerve root block, anterior cervical discectomy and fusion, and lumbar fusion and/ordecompression. DRTs exhibited variable responses to spinal surgery and depended on the patients' clinical presentation, spinal level involved, and type of procedure performed. The evidence regarding the patients' ability to resume safe driving after spinal surgery is scarce. Normalization of DRT or a return of DRT to pre-spinal intervention level is a widely accepted indicator for safe driving, with variable levels of statistical significance owing to multiple confounding factors. Considerations of the type of spinal intervention, pain level, opioid consumption, and cognitive function should be factored in the assessment of a patient's ability to safely resume driving.

  20. A departmental brief to the Ontario Nuclear Safety Review

    1987-09-01

    The major nuclear activity in Canada is that associated with the generation of electricity by nuclear power stations. This area is in part subject to federal jurisdiction under the authority of the Atomic Energy Control Board. Environment Canada can play a significant role in influencing decisions regarding environmental aspects of nuclear energy development. The Department believes that the best way to preserve the quality of the environment is to anticipate and prevent problems before they arise. However, even if all precautionary measures were taken in the design and operating procedures of nuclear power stations, accidents can occur and radionuclides and toxic pollutants may escape and disperse into the environment. This brief outlines the rationale for Environment Canada's involvement and role in the nuclear area, and the major programs and activities of the Department with respect to environmental protection and emergency preparedness. The brief also makes recommendations for consideration of environmental protection technologies for nuclear power stations, for improved measurement and modelling capabilities relating to release and dispersion of radionuclides during accident conditions, and for improved communication with the public following a nuclear emergency. Environment Canada recommends that an appropriate environmental review process be undertaken for new or expanded nuclear facilities in Ontario

  1. IAEA-led Operational Safety Team Reviews Dukovany Nuclear Power Plant, Czech Republic

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has commended the Dukovany Nuclear Power Plant (NPP) in the Czech Republic for its safety practices and has also made a series of recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of the Czech Republic to conduct an Operational Safety Review (OSART) of Dukovany NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 6 to 23 June 2011. The team was made up of experts from Armenia, Germany, Hungary, Romania, Slovenia, Sweden, the UK and the USA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Dukovany conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: The plant uses an integrated approach to recruit, select, psychologically assess and train new employees. This approach has resulted in consistently high success rates for licensed operator examinations and the identification of potential candidates for various plant departments; The performance

  2. Common issues found in operating safety peer review of nuclear power plants

    Wu Meijing; Zhang Fengping

    2004-01-01

    The 3rd stage of the safety culture promotion in a Nuclear Power Plant (NPP) is characterized by establishing learning organization and continuous self-improvement. Peer Review was used as an effective tool by a lot of NPPs to improve the overall management and performance. This Paper provided the WANO Peer Review Methodology, the common issues found, the recommendation or suggestions to correct the area for improvement. It may be beneficial to other NPP which planning to have Peer Review or Self Evaluation. (authors)

  3. IAEA Concludes Safety Review at Chooz Nuclear Power Plant in France

    2013-01-01

    Full text: An IAEA-led international team of nuclear safety experts noted good practices and made recommendations to reinforce safety measures during a review of operational safety at France's Chooz Nuclear Power Plant (NPP) that concluded today. The Operational Safety Review Team (OSART) was assembled at the French Government's request. The in-depth review, which began 17 June, focused on aspects essential to the safe operation of the NPP. The team comprised experts from Switzerland, Belgium, Germany, China, India, United Kingdom, Czech Republic, Canada, Hungary and the IAEA. The review covered the areas of management, organization and administration; training and qualification of personnel; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency planning and preparedness; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards. The OSART team identified good plant practices that will be shared with the rest of the nuclear industry for consideration. Examples include: The plant has a professional development programme as part of a joint employment effort shared by the plant and its contractors. This enables trainees to develop professional capability, understand practices and gain experience from other nuclear power plants in terms of work planning and coordination; The plant has built a strong relationship between the on-shift response team of the plant and the local fire brigade to improve firefighting and rescue operations; Self-assessment groups discuss and resolve specific issues within operations, empowering operations personnel to take ownership of improvement programmes; and The plant has improved warnings at entrances to all o range zones , areas of elevated dose rates to which only authorized staff have access. The team identified a number of improvements to operational safety at Chooz NPP. Examples include: The plant should review its process for the

  4. What is the value and impact of quality and safety teams? A scoping review

    Norris Jill M

    2011-08-01

    Full Text Available Abstract Background The purpose of this study was to conduct a scoping review of the literature about the establishment and impact of quality and safety team initiatives in acute care. Methods Studies were identified through electronic searches of Medline, Embase, CINAHL, PsycINFO, ABI Inform, Cochrane databases. Grey literature and bibliographies were also searched. Qualitative or quantitative studies that occurred in acute care, describing how quality and safety teams were established or implemented, the impact of teams, or the barriers and/or facilitators of teams were included. Two reviewers independently extracted data on study design, sample, interventions, and outcomes. Quality assessment of full text articles was done independently by two reviewers. Studies were categorized according to dimensions of quality. Results Of 6,674 articles identified, 99 were included in the study. The heterogeneity of studies and results reported precluded quantitative data analyses. Findings revealed limited information about attributes of successful and unsuccessful team initiatives, barriers and facilitators to team initiatives, unique or combined contribution of selected interventions, or how to effectively establish these teams. Conclusions Not unlike systematic reviews of quality improvement collaboratives, this broad review revealed that while teams reported a number of positive results, there are many methodological issues. This study is unique in utilizing traditional quality assessment and more novel methods of quality assessment and reporting of results (SQUIRE to appraise studies. Rigorous design, evaluation, and reporting of quality and safety team initiatives are required.

  5. Guidelines regarding the review process under the Convention on Nuclear Safety

    2002-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views

  6. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    Maskin, Mazleha; Choi, Kwang Sik

    2010-01-01

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  7. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    2013-01-01

    These Guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 of the Convention and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views.

  8. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    Maskin, Mazleha [Korea Advanced Institute for Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  9. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    2013-01-01

    These Guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 of the Convention and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views. [fr

  10. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    2011-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views [fr

  11. Guidelines regarding the review process under the convention on nuclear safety

    1998-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing national reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of national reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views

  12. Human factors engineering design review acceptance criteria for the safety parameter display

    McGevna, V.; Peterson, L.R.

    1981-01-01

    This report contains human factors engineering design review acceptance criteria developed by the Human Factors Engineering Branch (HFEB) of the Nuclear Regulatory Commission (NRC) to use in evaluating designs of the Safety Parameter Display System (SPDS). These criteria were developed in response to the functional design criteria for the SPDS defined in NUREG-0696, Functional Criteria for Emergency Response Facilities. The purpose of this report is to identify design review acceptance criteria for the SPDS installed in the control room of a nuclear power plant. Use of computer driven cathode ray tube (CRT) displays is anticipated. General acceptance criteria for displays of plant safety status information by the SPDS are developed. In addition, specific SPDS review criteria corresponding to the SPDS functional criteria specified in NUREG-0696 are established

  13. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    2011-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views

  14. Guidelines regarding the review process under the Convention on Nuclear Safety

    1999-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing national reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of national reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views

  15. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    2011-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views [es

  16. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    2013-01-01

    These Guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 of the Convention and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views. [es

  17. Importance of safety review to the safe operation of a nuclear plant

    Brinkerhoff, L.C.

    1978-01-01

    Widely differing standards of construction of nuclear reactors are employed in different countries. Although the reactor vendors, including designers and construction contractors, have a vested interest in safety, the ultimate responsibility for safety rests with the reactor facility operator. Even though governmental agencies, either directly or indirectly, must take a strong lead in developing policies and practices of safe operation, the reactor facility operator must recognize and accept the full responsibility for safe operation of the facility. The policies and practices of safe operation imposed by governmental agencies must help assure the prudent operation and the adequate maintenance of those structures, systems, and components of importance to safety. Since each country has a slightly different philosophy for achieving safety and each vendor utilizes different structures, systems, and components to fulfil this philosophy, it is imperative that the facility operator adequately maintain those engineered safety features and those plant protective systems which have been engineered into achieving the desired levels of safety. An additional method of helping to assure that those structures, systems, and components of importance to safety are prudently operated and adequately maintained is to assign the full safety responsibility for the overall operations of the reactor facility to the operating organization, i.e. assigning a 'line of responsibility' within the reactor facility operator. This assurance can be further strengthened by requiring that the facility operator establish a safety review body that overviews the operation and assures that the operating organization complies with those policies and practices of safe operation which have been imposed on the reactor facility. (author)

  18. Patient safety in out-of-hours primary care: a review of patient records

    Wensing Michel

    2010-12-01

    Full Text Available Abstract Background Most patients receive healthcare in primary care settings, but relatively little is known about patient safety. Out-of-hours contacts are of particular importance to patient safety. Our aim was to examine the incidence, types, causes, and consequences of patient safety incidents at general practice cooperatives for out-of-hours primary care and to examine which factors were associated with the occurrence of patient safety incidents. Methods A retrospective study of 1,145 medical records concerning patient contacts with four general practice cooperatives. Reviewers identified records with evidence of a potential patient safety incident; a physician panel determined whether a patient safety incident had indeed occurred. In addition, the panel determined the type, causes, and consequences of the incidents. Factors associated with incidents were examined in a random coefficient logistic regression analysis. Results In 1,145 patient records, 27 patient safety incidents were identified, an incident rate of 2.4% (95% CI: 1.5% to 3.2%. The most frequent incident type was treatment (56%. All incidents had at least partly been caused by failures in clinical reasoning. The majority of incidents did not result in patient harm (70%. Eight incidents had consequences for the patient, such as additional interventions or hospitalisation. The panel assessed that most incidents were unlikely to result in patient harm in the long term (89%. Logistic regression analysis showed that age was significantly related to incident occurrence: the likelihood of an incident increased with 1.03 for each year increase in age (95% CI: 1.01 to 1.04. Conclusion Patient safety incidents occur in out-of-hours primary care, but most do not result in harm to patients. As clinical reasoning played an important part in these incidents, a better understanding of clinical reasoning and guideline adherence at GP cooperatives could contribute to patient safety.

  19. Whole blood pathogen reduction technology and blood safety in sub-Saharan Africa: A systematic review with regional discussion

    Nkohkwo, Asa?ah; Agbor, Gabriel; Asongalem, Emmanuel; Tagny, Claude; Asonganyi, Tazoacha

    2016-01-01

    Background: Despite vast improvements in transfusion services in sub-Saharan Africa over the last decade, there remain serious concerns on the safety and adequacy of the blood supply across the region. Objective: This review paper ascertains the role of pathogen reduction technology (PRT) in improving blood safety and supply adequacy in the region. Method: The state of blood safety in sub-Saharan Africa was reviewed. Meetings, seminars and correspondence were undertaken with key clinic...

  20. The implementation and discussion on review of periodic safety reviews (PSRs) for research reactors in China

    Gao Quanyuan

    2011-01-01

    The overview of regulations with which the review of PSRs for research reactors shall comply, the implementation of the review of PSRs for research reactors in China and its effects, the discussion on several issues about PSRs for research reactors and its review, and suggestions on reinforcing the PSRs for research reactors in China are concerned. (author)

  1. ASCOT guidelines revised 1996 edition. Guidelines for organizational self-assessment of safety culture and for reviews by the assessment of safety culture in organizations team

    1996-01-01

    In order to properly assess safety culture, it is necessary to consider the contribution of all organizations which have an impact on it. Therefore, while assessing the safety culture in an operating organization it is necessary to address at least its interfaces with the local regulatory agency, utility corporate headquarters and supporting organizations. These guidelines are primarily intended for use by any organization wishing to conduct a self-assessment of safety culture. They should also serve as a basis for conducting an international peer review of the organization's self-assessment carried out by an ASCOT (Assessment of Safety Culture in Organizations Team) mission

  2. Pharmacist medication reviews to improve safety monitoring in primary care patients.

    Gallimore, Casey E; Sokhal, Dimmy; Zeidler Schreiter, Elizabeth; Margolis, Amanda R

    2016-06-01

    Patients prescribed psychotropic medications within primary care are at risk of suboptimal monitoring. It is unknown whether pharmacists can improve medication safety through targeted monitoring of at risk populations. Access Community Health Centers implemented a quality improvement pilot project that included pharmacists on an integrated care team to provide medication reviews for patients. Aims were to determine whether inclusion of a pharmacist performing medication reviews within a primary care behavioral health (PCBH) practice is feasible and facilitates safe medication use. Pharmacists performed medication reviews of the electronic health record for patients referred for psychiatry consultation. Reviews were performed 1-3 months following consultation and focused on medications with known suboptimal monitoring rates. Reviews were documented within the EHR and routed to the primary care provider. Primary outcome measures were change in percentage up-to-date on monitoring and AIMS assessment, and at risk of experiencing drug interaction(s) between baseline and 3 months postreview. Secondary outcome was provider opinion of medication reviews collected via electronic survey. Reviews were performed for 144 patients. Three months postreview, percentage up-to-date on recommended monitoring increased 18% (p = .0001), at risk for drug interaction decreased 20% (p improved safety monitoring of psychotropic medications. Results identify key areas for improvement that other clinics considering integration of similar pharmacy services should consider. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  3. Updating Human Factors Engineering Guidelines for Conducting Safety Reviews of Nuclear Power Plants

    O'Hara, J.M.; Higgins, J.; Fleger, Stephen

    2011-01-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. This paper describes the role of HFE guidelines in the safety review process and the content of the key HFE guidelines used. Then we will present the methodology used to develop HFE guidance and update these documents, and describe the current status of the update program.

  4. Determinants of safety outcomes and performance: A systematic literature review of research in four high-risk industries.

    Cornelissen, Pieter A; Van Hoof, Joris J; De Jong, Menno D T

    2017-09-01

    In spite of increasing governmental and organizational efforts, organizations still struggle to improve the safety of their employees as evidenced by the yearly 2.3 million work-related deaths worldwide. Occupational safety research is scattered and inaccessible, especially for practitioners. Through systematically reviewing the safety literature, this study aims to provide a comprehensive overview of behavioral and circumstantial factors that endanger or support employee safety. A broad search on occupational safety literature using four online bibliographical databases yielded 27.527 articles. Through a systematic reviewing process 176 online articles were identified that met the inclusion criteria (e.g., original peer-reviewed research; conducted in selected high-risk industries; published between 1980-2016). Variables and the nature of their interrelationships (i.e., positive, negative, or nonsignificant) were extracted, and then grouped and classified through a process of bottom-up coding. The results indicate that safety outcomes and performance prevail as dependent research areas, dependent on variables related to management & colleagues, work(place) characteristics & circumstances, employee demographics, climate & culture, and external factors. Consensus was found for five variables related to safety outcomes and seven variables related to performance, while there is debate about 31 other relationships. Last, 21 variables related to safety outcomes and performance appear understudied. The majority of safety research has focused on addressing negative safety outcomes and performance through variables related to others within the organization, the work(place) itself, employee demographics, and-to a lesser extent-climate & culture and external factors. This systematic literature review provides both scientists and safety practitioners an overview of the (under)studied behavioral and circumstantial factors related to occupational safety behavior. Scientists

  5. International Nuclear Safety Experts Conclude IAEA Peer Review of Korea's Regulatory System

    2011-01-01

    Full text: An international team of senior nuclear safety experts concluded today a two-week mission to review the regulatory framework for nuclear safety in the Republic of Korea. The team identified good practices and gave advice on areas for future improvements. The IAEA has conveyed the team's main conclusions to the Government of Korea, while the final report will be submitted by the end of summer 2011. At the request of the Korean Government, the IAEA assembled a team of 16 senior regulatory experts from 14 nations to conduct the Integrated Regulatory Review Service (IRRS) mission involving the Korean Ministry for Education, Science and Technology (MEST) and the Korean Institute for Nuclear Safety (KINS). The mission is a peer-review based on the IAEA Safety Standards. ''This was the first IRRS mission organized after Japan's Fukushima Daiichi nuclear accident and it included a review of the regulatory implications of that event,' explains Denis Flory, IAEA Deputy Director General and Head of the Department of Nuclear Safety and Security. William Borchardt, Executive Director of Operations from the US Nuclear Regulatory Commission and Team Leader of this mission commended the Korean authorities for their openness and commitment to sharing their experience with the world's nuclear safety community. ''IRRS missions such as the one that was just concluded here in the Republic of Korea are crucial to the enhancement of nuclear safety worldwide,'' he said. The IRRS team reviewed Korea's current regulatory framework while acknowledging the fact that the country's Government has already decided to establish, as of October 2011, a new independent regulatory body to be called Nuclear Safety Commission (NSC). As a consequence, KINS role will be as a regulatory expert organization reporting to the NSC, while MEST's role will be restricted to promoting the utilization of nuclear energy. The IRRS team identified particular strengths in the Korean regulatory system

  6. International review of Kursk unit 1 in-depth safety analysis report

    Chouha, M.; Bolshov, L.; Butcher, P.; Janke, R.; Parsons, T.; Weber, J.P.

    2004-01-01

    The paper presents the objectives, organisation, main findings and conclusions of the international review of the Kursk unit 1 safety analysis report (K1IRSR). The K1IRSR was administered by RISKAUDIT IRSN/GRS international and carried out by international experts from 7 western countries plus the Russian Federation, under the supervision of the safety review group (SRG) of the European bank for reconstruction and development (EBRD). The project was financed by the nuclear safety account (NSA) administered by the EBRD. The Russian experts worked under a contract with IBRAE financed by Rosenergoatom. The main conclusions were that the SAR followed a correct approach, broadly in line with Russian and international guidance documents, but needed improvement in structure and content. It established that the safety level of the unit has been increased significantly by the modernisation programme. The important deviations of the unit from current Russian regulations and the IAEA safety issues for RBMK are either fully resolved or are being addressed to the extent possible by compensatory measures to further reduce the risk. The K1IRSR experts have made a number of recommendations for improvement of the K1SAR. The authors agreed to take the recommendations into account in future revision of the K1SAR. (orig.)

  7. Review of SKB's report, SR 97 - Post-closure safety

    Holmlund, P.

    2000-01-01

    The climate and glaciation scenarios are described in detail and largely adequately supported by data. The deficiencies that I have chosen to point out are serious from the point of view of principle. I have not attempted to assess the significance of these deficiencies for a future repository. The climate predictions used in the reports are internationally generally accepted models, which can be said to be uncontroversial. However, they have been overutilized in that too much confidence has been placed in the results. The uncontroversial part of the climate scenario is the predicted development, that is, that there will be alternating cold and warm periods over the next hundred thousand year period, like we have experienced during the last glacial cycle. However, time and temperature data are naturally highly uncertain. As a reviewer, it is difficult for me to understand why priority has not been given to reconstructing events that have occurred at the possible repository sites studied in the report instead of performing general calculations based on the highly inaccurate future scenarios. High resolution data are available from the last glacial cycle. Geological evidence is also available which provides information on temperature conditions within and beneath the ice and, thereby, also provides information on the hydrology of the ice and beneath the ice. We know a great deal about these conditions, but nothing about the future. The modelling of extent of the ice sheet is not significantly different from other model experiments, which means that it largely reflects what most researchers consider to have occurred and likely to occur. However, the modelling results relating to the temperature distribution are highly controversial. These results are not supported by other modelling data, which on the contrary clearly indicate temperature patterns in and beneath the ice, which deviate from SR 97. The classification into ice divide zones and melting zones lacks a

  8. International Nuclear Safety Experts Conclude IAEA Peer Review of Swiss Regulatory Framework

    2011-01-01

    Full text: A team of international nuclear safety experts today completed a two-week International Atomic Energy Agency (IAEA) review of the regulatory framework for nuclear safety in Switzerland. The Integrated Regulatory Review Service (IRRS) mission noted good practices in the Swiss system and also made recommendations for the nation's nuclear regulatory authority, the Swiss Federal Nuclear Safety Inspectorate (ENSI). ''Our team developed a good impression of the independent Swiss regulator - ENSI - and the team considered that ENSI deserves particular credit for its actions to improve Swiss safety capability following this year's nuclear accident in Japan,'' said IRRS Team Leader Jean-Christophe Niel of France. The mission's scope covered the Swiss nuclear regulatory framework for all types of nuclear-related activities regulated by ENSI. The mission was conducted from 20 November to 2 December, mainly at ENSI headquarters in Brugg. The team held extensive discussions with ENSI staff and visited many Swiss nuclear facilities. IRRS missions are peer reviews, not inspections or audits, and are conducted at the request of host nations. For the Swiss review, the IAEA assembled a team of 19 international experts from 14 countries. The experts came from Belgium, Brazil, the Czech Republic, Finland, France, Germany, Italy, the Republic of Korea, Norway, Russia, Slovakia, Sweden, the United Kingdom, and the United States. ''The findings of the IRRS mission will help us to further improve our work. That is part of our safety culture,'' said ENSI Director General Hans Wanner. ''As Switzerland argued at international nuclear safety meetings this year for a strengthening of the international monitoring of nuclear power, we will take action to fulfil the recommendations.'' The IRRS team highlighted several good practices of the Swiss regulatory system, including the following: ENSI requires Swiss nuclear operators to back-fit their facilities by continuously upgrading

  9. Safety of licensed vaccines in HIV-infected persons: a systematic review protocol

    2014-01-01

    Background Safety of vaccines remains a cornerstone of building public trust on the use of these cost-effective and life-saving public health interventions. In some settings, particularly Sub-Saharan Africa, there is a high prevalence of HIV infection and a high burden of vaccine-preventable diseases. There is evidence suggesting that the immunity induced by some commonly used vaccines is not durable in HIV-infected persons, and therefore, repeated vaccination may be considered to ensure optimal vaccine-induced immunity in this population. However, some vaccines, particularly the live vaccines, may be unsafe in HIV-infected persons. There is lack of evidence on the safety profile of commonly used vaccines among HIV-infected persons. We are therefore conducting a systematic review to assess the safety profile of routine vaccines administered to HIV-infected persons. Methods/Design We will select studies conducted in any setting where licensed and effective vaccines were administered to HIV-infected persons. We will search for eligible studies in PubMed, Web of Science, Cochrane Central Register of Controlled Trials (CENTRAL), Scopus, Africa-Wide, PDQ-Evidence and CINAHL as well as reference lists of relevant publications. We will screen search outputs, select studies and extract data in duplicate, resolving discrepancies by discussion and consensus. Discussion Globally, immunisation is a major public health strategy to mitigate morbidity and mortality caused by various infectious disease-causing agents. In general, there are efforts to increase vaccination coverage worldwide, and for these efforts to be successful, safety of the vaccines is paramount, even among people living with HIV, who in some situations may require repeated vaccination. Results from this systematic review will be discussed in the context of the safety of routine vaccines among HIV-infected persons. From the safety perspective, we will also discuss whether repeat vaccination strategies may be

  10. Safety as a management concept in the air transport sector: A systematic literature review

    Fernando Campa-Planas

    2017-01-01

    Full Text Available Purpose: The main purpose of the present study is to conduct a literature review of the contribution made by safety in air transport, based on the existing international academic literature in the field of the social sciences. It primarily attempts to examine and verify the relationship between safety-related concepts (co-occurrence, the link between the different authors (co-authorship and the corresponding citations (co-citations. Methodology: To achieve the established objectives, a systematic literature review (SLR has been conducted using the Scopus database between the years 1990 and 2016, identifying international academic papers related to the research topic of the present study. Findings: It has been verified, on the one hand, that safety in the air transport sector is a field of growing interest, as the number of papers has increased considerably in recent years, thus demonstrating the importance that this topic has acquired over time. On the other hand, however, it must be mentioned that the total quantity of papers related to the topic is low in terms of absolute numbers. The results of the co-occurrence analysis show that the most important aspect of safety is safety management, while the strongest link is between safety management and aircraft accidents, a fact that is foreseeable a priori.  Originality/value: The approach used allows a better view of the academic contribution made in relation to safety; this serves as the link among the different elements of the concept studied, and it demonstrates the growing interest in this area.

  11. Nuclear safety review 1992. Part D of the IAEA Yearbook 1992

    1992-09-01

    in general and nuclear power production in particular: Safety must be the first priority, from the design stage through to decommissioning; Safety must be enforced at all levels and at all stages; therefore, strong regulatory bodies are needed; Transparency in operating experience feedback and the open international exchange of lessons learned are essential for improving design and operational safety; The safety assessment of old reactors is not easy, expert judgement being needed in determining the safety significance of major findings; More emphasis must be placed on acquiring and maintaining a sound safety culture. Nuclear safety may be costly, but the resources allocated to it represent money well spent and the potential savings are very large. Countries launching nuclear power programmes must be ready to allocate the necessary financial and human resources to nuclear safety. The radiological accidents which have occurred and various reviews performed in Member States have also demonstrated the importance of appropriate infrastructures, of the human factor and of training. The management of radiation sources remains a major concern of the radiation protection community

  12. Measures to strengthen international co-operation in nuclear, radiation and transport safety and waste management. Nuclear safety review for the year 2003

    2004-01-01

    The Nuclear Safety Review for the Year 2003 presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety during 2003. As in 2002 the overview is supported by more detailed Notes by the Secretariat: Safety Related Events and Issues Worldwide during 2003 (document 2004/Note 6), The Agency's Safety Standards: Activities during 2003 (document 2004/Note 7) and Providing for the Application of the Safety Standards (document 2004/Note 8). In January 2003, the Agency implemented an organization change and developed an integrated approach to reflect a broader assignment of nuclear safety and nuclear security and to better exploit synergy between them. The Office of Physical Protection and Material Security renamed to Office of Nuclear Security was transferred from the Department of Safeguards to the Department of Nuclear Safety, which became the Department of Nuclear Safety and Security to reflect the change. This Review provides information primarily on nuclear safety, and nuclear security will be addressed in a separate report

  13. International Expert Team Concludes IAEA Peer Review of Poland's Regulatory Framework for Nuclear and Radiation Safety

    2013-01-01

    Full text: International safety experts last week concluded a two-week International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety in Poland. In its preliminary report, the Integrated Regulatory Review Service (IRRS) mission team found that Poland's nuclear regulator, Panstwowa Agencja Atomistyki (PAA), has a clear commitment to safety, a high level of transparency, competent staff and leadership, and a good recognition of challenges ahead related to Poland's efforts to develop nuclear power. ''Poland's regulatory framework and the work of PAA give high confidence of strong radiation protection for the Polish people. Further, there has been significant progress in the development of Poland's regulatory framework in preparation for the challenge of regulating nuclear power,'' said team leader Robert Lewis, a senior executive in the US Nuclear Regulatory Commission. The mission was conducted at the request of the Government of Poland from 15-25 April. The team was made up of 11 regulatory experts from Belgium, the Czech Republic, Finland, France, the Republic of Korea, Slovakia, Slovenia, Sweden, the United Arab Emirates, the United Kingdom and the United States, as well as five IAEA staff members. The IRRS review team was very thorough in its review, and we welcome its advice on how to continue to improve our programmes to protect people and the environment , said Janusz Wlodarski, President of PAA. The team interviewed members of PAA and officials from various ministries, as well as key players in the Polish safety framework. Such IRRS missions are peer reviews based on IAEA Safety Standards, not inspections or audits. Among its main observations the IRRS review team identified the following good practices: Applying the considerable experience of PAA's senior management to regulatory issues; The introduction of changes to Poland's laws and regulations following broad public consultation at an early stage in

  14. An overview of review guidelines for HDL programmable devices in nuclear safety systems

    Komanduri, Raghavan; Srivani, L.; Thirugnana Murthy, D.

    2013-01-01

    HDL programmable devices viz. CPLDs and FPGAs are increasingly being used to implement digital designs in the I and C systems performing safety functions of nuclear power plants. Synthesizable RTL descriptions manually written in HDLs are the first step in developing industry standard large scale digital designs. The reliability of the implementation is determined by the methodologies followed by the designer during development. Very few guidelines on HPD design practices, specific to nuclear industry are available. This paper presents an overview of the existing guidelines such as IEC 62566 and U.S. NRC's 'Review guidelines for FPGAs in nuclear power plant safety systems'. (author)

  15. Critical review of controlled release packaging to improve food safety and quality.

    Chen, Xi; Chen, Mo; Xu, Chenyi; Yam, Kit L

    2018-03-19

    Controlled release packaging (CRP) is an innovative technology that uses the package to release active compounds in a controlled manner to improve safety and quality for a wide range of food products during storage. This paper provides a critical review of the uniqueness, design considerations, and research gaps of CRP, with a focus on the kinetics and mechanism of active compounds releasing from the package. Literature data and practical examples are presented to illustrate how CRP controls what active compounds to release, when and how to release, how much and how fast to release, in order to improve food safety and quality.

  16. The efficacy and safety of a novel posterior scleral reinforcement device in rabbits

    Yuan, Yongguang; Zong, Yao; Zheng, Qishan [State Key Laboratory of Ophthalmology, Zhongshan Ophthalmic Center, Sun Yat-sen University, Guangzhou (China); Qian, Garrett [University of New South Wales (Australia); Qian, Xiaobin; Li, Yujie; Shao, Wanwen [State Key Laboratory of Ophthalmology, Zhongshan Ophthalmic Center, Sun Yat-sen University, Guangzhou (China); Gao, Qianying, E-mail: gaoqy@mail.sysu.edu.cn [State Key Laboratory of Ophthalmology, Zhongshan Ophthalmic Center, Sun Yat-sen University, Guangzhou (China)

    2016-05-01

    Purpose: To evaluate the efficacy and safety of posterior scleral reinforcement (PSR) device for myopia suppression in rabbits' eyes. Methods: PSR surgery was performed on the normal 12 8-week-old New Zealand white rabbits' right eyes. To determine efficacy of the device, ophthalmic examination would be taken at pre-operation and post-operation (1 week, 1 month, 3 months, 6 months, and 1 year), such as A-ultrasound, diopter and B-ultrasound. Evaluation of safety were based on the following indicators: intraocular pressure (IOP), slit lamp, fundus photography, fundus fluorescein angiography and pathological examination after surgery. The efficacy and safety of PSR device were evaluated by comparison (treated eyes and contralateral eyes) of pre and post-operation. Results: The novel PSR device could significantly shorten axial length (preoperative axial length: 16.36 ± 0.14 mm, postoperative 1 week, 1 month, 3 months, 6 months and 1 year axial lengths: 15.03 ± 0.28 mm, 15.23 ± 0.32 mm, 15.39 ± 0.31 mm, 15.45 ± 0.22 mm and 15.45 ± 0.22 mm; P = 0.00037 < 0.001) in the treated eyes (right eyes) after surgery. At different postoperative time points, the B-ultrasound images showed that the PSR located in appropriate position and supported the posterior sclera very well. At the same time, IOP of treated eyes kept a relatively stable level (preoperative IOP: 12.56 ± 2.01 mmHg, postoperative IOP: ranging from 11.33 ± 1.23 mmHg to 13.44 ± 2.19 mmHg, P > 0.05) post-operation 1 year. During observation period, there was no significant inflammatory reaction and complications such as anterior chamber flare, empyema, endophthalmitis, vitreous hemorrhage, retina detachment and retinal choroid neovascularization by slit lamp, fundus photography and fundus fluorescein angiography. In addition, there were no pathologic changes be found by comparison treated eyes group and contralateral group eyes based on pathological examinations. Conclusions: In vivo study

  17. The Role of Fear Appeals in Improving Driver Safety: A Review of the Effectiveness of Fear-Arousing (Threat) Appeals in Road Safety Advertising

    Lewis, I.; Watson, B.; Tay, R.; White, K. M.

    2007-01-01

    This paper reviews theoretical and empirical evidence relating to the effectiveness of fear (threat) appeals in improving driver safety. The results of the review highlight the mixed and inconsistent findings that have been reported in the literature. While fear arousal appears important for attracting attention, its contribution to behaviour…

  18. Report of the review committee on evaluation of the R and D subjects in the field of nuclear safety research

    2000-09-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee and Research Evaluation Committee, the Ad Hoc Review Committee on Nuclear Safety Research composed of twelve experts was set up under the Research Evaluation Committee of the JAERI in order to review the R and D subjects to be implemented for five years starting in FY2000 in the Nuclear Safety Research Center (Department of Reactor Safety Research, Department of Fuel Cycle Safety Research and Department of Safety Research Technical Support). The Ad Hoc Review Committee meeting was held on January 20, 2000. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research plan documents submitted in advance and presentations by the Department Directors. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  19. Occupational health and safety issues affecting young workers: a literature review.

    Laberge, Marie; Ledoux, Elise

    2011-01-01

    Many overview articles, reports, book chapters and literature reviews have examined the health and safety of young workers. These sources discuss the relationships between the work conditions of young workers and the various indicators of accidents and occupational diseases. Breslin et al. [12,13] conducted two literature reviews of quantitative studies to determine which factors best predicted work accidents and occupational disorders in young people. The present article proposes a review of young people's occupational health and safety (OHS) factors (e.g., demographic, individual, professional, organizational, temporal and operational factors) in both qualitative and quantitative studies. Five types of problems were analyzed in greater depth, namely MSD symptoms, respiratory, allergy and toxicological problems, mental health and well-being, alcohol and drug consumption, and fatigue. This review likewise examines related dimensions that allow us to adopt a more global perspective on this subject by considering such elements as young people's values, their knowledge and attitudes, safety practices in companies, the safe integration of young people, and rehabilitation. A total of 189 scientific articles were selected on the basis of certain criteria. These articles came from refereed OHS journals published between 1994 and 2005.

  20. Air Travel Safety in Postoperative Breast Cancer Patients: A Systematic Review.

    Co, Michael; Ng, Judy; Kwong, Ava

    2018-05-17

    Air travel has long been a dilemma in post-breast cancer surgery patients. Anecdotal reports have described adverse outcomes on surgical wound, implants, and lymphedema during air travel. This review aims to evaluate the best evidence from the literature concerning the air travel safety in breast cancer patients. A comprehensive review was performed of the Medline, Embase, CINAHL, and Cochrane databases using a predefined strategy. Retrieved studies were independently screened and rated for relevance. Data were extracted by 2 researchers. We reviewed the best evidence on air travel safety in postoperative breast cancer patients. Evidence was limited in the current literature to suggest adverse effects on postoperative mastectomy wounds and drains by high-altitude travel. Similarly, adverse effects on breast implants were limited to case reports and ex vivo experiments. A systematic review of 12 studies concluded that air travel is not associated with upper limb lymphedema after breast cancer surgery. Deep-vein thrombosis (DVT) is a known complication after air travel; in addition, malignancy itself is a known risk factor for DVT. Evidence of safety to continue tamoxifen during the period of air travel is lacking in the literature. Evidence to support the use of systemic DVT prophylaxis in general postoperative breast cancer patients is also limited. Best evidence from a large retrospective study suggested that mechanical antiembolism devices and early mobilization are the only measures required. Air travel is generally safe in patients after breast cancer surgery. Copyright © 2018. Published by Elsevier Inc.

  1. Why is patient safety so hard? A selective review of ethnographic studies.

    Dixon-Woods, Mary

    2010-01-01

    Ethnographic studies are valuable in studying patient safety. This is a narrative review of four reports of ethnographic studies of patient safety in UK hospitals conducted as part of the Patient Safety Research Programme. Three of these studies were undertaken in operating theatres and one in an A&E Department. The studies found that hospitals were rarely geared towards ensuring perfect performances. The coordination and mobilization of the large number of inter-dependent processes and resources needed to support the achievement of tasks was rarely optimal. This produced significant strain that staff learned to tolerate by developing various compensatory strategies. Teamwork and inter-professional communication did not always function sufficiently well to ensure that basic procedural information was shared or that the required sequence of events was planned. Staff did not always do the right things, for a wide range of different reasons, including contestations about what counted as the right thing. Structures of authority and accountability were not always clear or well-functioning. Patient safety incidents were usually not reported, though there were many different reasons for this. It can be concluded that securing patient safety is hard. There are multiple interacting influences on safety, and solutions need to be based on a sound understanding of the nature of the problems and which approaches are likely to be best suited to resolving them. Some solutions that appear attractive and straightforward are likely to founder. Addressing safety problems requires acknowledgement that patient safety is not simply a technical issue, but a site of organizational and professional politics.

  2. The French Experience Regarding Peer Reviews to Improve the Safety and Security of Radioactive Sources

    Lachaume, J.-L.; Bélot, G.

    2015-01-01

    France has a 50 year history of control over radioactive sources. Convinced that peer reviews may be helpful to improve any regulatory system, France decided to experience a ‘full scope’ Integrated Regulatory Review Service mission in 2006 and its follow-up mission in 2009, including a review of the implementation of the Code of Conduct. The reviews, interviews and observations performed during these missions enabled the experts to have a thorough knowledge of the French system and to highlight its strengths and ways for improvements. Following these reviews, France decided to rely on its good practices, extend them as much as possible and to define, implement and address an action plan to improve its regulatory control over radioactive sources, while maintaining the prime responsibility on the operators. While good practices in the tracking of sources were maintained and slight evolutions were conducted in the safety regulations, licensing process, and inspection and enforcement actions, the major outcome of these reviews will obviously consist of the entrustment of the French Nuclear Safety Authority with the role of the regulatory authority for the security of radioactive sources and the implementation of dedicated provisions. (author)

  3. Discovery of a radio nebula around PSR J0855-4644

    Maitra, C.; Roy, S.; Acero, F.; Gupta, Y.

    2018-03-01

    We report the discovery of a diffuse radio emission around PSR J0855-4644 using an upgraded GMRT (uGMRT) observation at 1.35 GHz. The radio emission is spatially coincident with the diffuse X-ray pulsar wind nebula (PWN) seen with XMM-Newton but is much larger in extent compared to the compact axisymmetric PWN seen with Chandra. The morphology of the emission, with a bright partial ring-like structure and two faint tail-like features strongly resembles a bow shock nebula, and indicates a velocity of 100 km/s through the ambient medium. We conclude that the emission is most likely to be associated with the radio PWN of PSR J0855-4644. From the integrated flux density, we estimate the energetics of the PWN.

  4. The Extended X-ray Nebula of PSR J1420-6048

    Van Etten, Adam; Romani, Roger W.; /Stanford U., Phys. Dept.

    2011-08-19

    The vicinity of the unidentified EGRET source 3EG J1420-6038 has undergone extensive study in the search for counterparts, revealing the energetic young pulsar PSR J1420-6048 and its surrounding wind nebula as a likely candidate for at least part of the emission from this bright and extended gamma-ray source. We report on new Suzaku observations of PSR J1420-6048, along with analysis of archival XMM Newton data. The low background of Suzaku permits mapping of the extended X-ray nebula, indicating a tail stretching {approx} 8 minutes north of the pulsar. The X-ray data, along with archival radio and VHE data, hint at a pulsar birthsite to the North, and yield insights into its evolution and the properties of the ambient medium. We further explore such properties by modeling the spectral energy distribution (SED) of the extended nebula.

  5. X-RAY STUDIES OF THE BLACK WIDOW PULSAR PSR B1957+20

    Huang, R. H. H.; Kong, A. K. H.; Takata, J.; Cheng, K. S.; Hui, C. Y.; Lin, L. C. C.

    2012-01-01

    We report on Chandra observations of the black widow pulsar, PSR B1957+20. Evidence for a binary-phase dependence of the X-ray emission from the pulsar is found with a deep observation. The binary-phase-resolved spectral analysis reveals non-thermal X-ray emission of PSR B1957+20, confirming the results of previous studies. This suggests that the X-rays are mostly due to intra-binary shock emission, which is strongest when the pulsar wind interacts with the ablated material from the companion star. The geometry of the peak emission is determined in our study. The marginal softening of the spectrum of the non-thermal X-ray tail may indicate that particles injected at the termination shock are dominated by synchrotron cooling.

  6. Confirmation of Earth-Mass Planets Orbiting the Millisecond Pulsar PSR B1257 + 12.

    Wolszczan, A

    1994-04-22

    The discovery of two Earth-mass planets orbiting an old ( approximately 10(9) years), rapidly spinning neutron star, the 6.2-millisecond radio pulsar PSR B1257+12, was announced in early 1992. It was soon pointed out that the approximately 3:2 ratio of the planets' orbital periods should lead to accurately predictable and possibly measurable gravitational perturbations of their orbits. The unambiguous detection of this effect, after 3 years of systematic timing observations of PSR B1257+12 with the 305-meter Arecibo radiotelescope, as well as the discovery of another, moon-mass object in orbit around the pulsar, constitutes irrefutable evidence that the first planetary system around a star other than the sun has been identified.

  7. A comparative review of patient safety initiatives for national health information technology

    Magrabi, Farah; Aarts, Jos; Nøhr, Christian

    2013-01-01

    OBJECTIVE: To collect and critically review patient safety initiatives for health information technology (HIT). METHOD: Publicly promulgated set of advisories, recommendations, guidelines, or standards potentially addressing safe system design, build, implementation or use were identified...... by searching the websites of regional and national agencies and programmes in a non-exhaustive set of exemplar countries including England, Denmark, the Netherlands, the USA, Canada and Australia. Initiatives were categorised by type and software systems covered. RESULTS: We found 27 patient safety initiatives...... were aimed at certification in the USA, Canada and Australia. Safety is addressed alongside interoperability in the Australian certification programme but it is not explicitly addressed in the US and Canadian programmes, though conformance with specific functionality, interoperability, security...

  8. Knowledge, attitudes and practices of food handlers in food safety: An integrative review.

    Zanin, Laís Mariano; da Cunha, Diogo Thimoteo; de Rosso, Veridiana Vera; Capriles, Vanessa Dias; Stedefeldt, Elke

    2017-10-01

    This study presents an overview of the relationship between knowledge, attitudes and practices (KAP) of food handlers with training in food safety, in addition to proposing reflections on the training of food handlers, considering its responsibility for food safety and health of consumers. The review was based on the integrative method. The descriptors used were: (food handler), (knowledge, attitudes and practice) and (training). Six databases were searched, 253 articles were consulted and 36 original articles were included. Fifty per cent of the articles pointed that there was no proper translation of knowledge into attitudes/practices or attitudes into practices after training. Knowledge, attitudes and practices of food handlers are important for identifying how efficient training in food safety is allowing prioritize actions in planning training. The evaluation of KAP is the first step to understand the food handler's point of view. After this evaluation other diagnostic strategies become necessary to enhance this understanding. Copyright © 2017. Published by Elsevier Ltd.

  9. Road safety effects of porous asphalt: a systematic review of evaluation studies

    Elvik, R.; Greibe, Poul

    2005-01-01

    of eighteen estimates of the effect of porous asphalt on accident rates. No clear effect on road safety of porous asphalt was found. All summary estimates of effect indicated very small changes in accident rates and very few were statistically significant at conventional levels. Studies that have evaluated...... of these changes in risk factors on accident occurrence cannot be predicted. On the whole, the research that has been reported so far regarding road safety effects of porous asphalt is inconclusive. The studies are not of high quality and the findings are inconsistent.......This paper presents a systematic review of studies that have evaluated the effects on road safety of porous asphalt. Porous asphalt is widely used on motorways in Europe, mainly in order to reduce traffic noise and increase road capacity. A meta-analysis was made of six studies, containing a total...

  10. Involving patients in patient safety programmes: A scoping review and consensus procedure by the LINNEAUS collaboration on patient safety in primary care.

    Trier, Hans; Valderas, Jose M; Wensing, Michel; Martin, Helle Max; Egebart, Jonas

    2015-09-01

    Patient involvement has only recently received attention as a potentially useful approach to patient safety in primary care. To summarize work conducted on a scoping review of interventions focussing on patient involvement for patient safety; to develop consensus-based recommendations in this area. Scoping review of the literature 2006-2011 about methods and effects of involving patients in patient safety in primary care identified evidence for previous experiences of patient involvement in patient safety. This information was fed back to an expert panel for the development of recommendations for healthcare professionals and policy makers. The scoping review identified only weak evidence in support of the effectiveness of patient involvement. Identified barriers included a number of patient factors but also the healthcare workers' attitudes, abilities and lack of training. The expert panel recommended the integration of patient safety in the educational curricula for healthcare professionals, and expected a commitment from professionals to act as first movers by inviting and encouraging the patients to take an active role. The panel proposed a checklist to be used by primary care clinicians at the point of care for promoting patient involvement. There is only weak evidence on the effectiveness of patient involvement in patient safety. The recommendations of the panel can inform future policy and practice on patient involvement in safety in primary care.

  11. Electron-cloud updated simulation results for the PSR, and recent results for the SNS

    Pivi, M.; Furman, M.A.

    2002-01-01

    Recent simulation results for the main features of the electron cloud in the storage ring of the Spallation Neutron Source (SNS) at Oak Ridge, and updated results for the Proton Storage Ring (PSR) at Los Alamos are presented in this paper. A refined model for the secondary emission process including the so called true secondary, rediffused and backscattered electrons has recently been included in the electron-cloud code

  12. Unbunched beam electron-proton instability in the PSR and advanced hadron facilities

    Wang, Tai-Sen; Pisent, A.; Neuffer, D.V.

    1989-01-01

    We studied the possibility of the occurrence of transverse instability induced by trapped electrons in unbunched beams in the Proton Storage Ring and the proposed Advance Hadron Facility (AHF) at Los Alamos, as well as in the proposed Kaon Factory at TRIUMF. We found that the e-p instability may be possible for unbunched beams in the PSR but is unlikely to occur in the advanced hadron facilities. 8 refs., 4 figs

  13. THE X-RAY COUNTERPART OF THE HIGH-B PULSAR PSR J0726–2612

    Speagle, J. S.; Kaplan, D. L.; Van Kerkwijk, M. H.

    2011-01-01

    Middle-aged, cooling neutron stars are observed both as relatively rapidly spinning radio pulsars and as more slowly spinning, strongly magnetized isolated neutron stars (INSs), which stand out by their thermal X-ray spectra. The difference between the two classes may be that the INSs initially had much stronger magnetic fields, which decayed. To test this, we used the Chandra X-ray Observatory to observe 1RXS J072559.8–261229, a possible X-ray counterpart to PSR J0726–2612, which, with its 3.44 s period and 3 × 10 13 G inferred magnetic field strength, is the nearest and least extincted among the possible slowly spinning, strong-field INS progenitors (it likely is in the Gould Belt, at ∼1 kpc). We confirm the identification and find that the pulsar has a spectrum consistent with being purely thermal, with blackbody temperature kT = 87 ± 5 eV and radius R = 5.7 +2.6 –1.3 km at a distance of 1 kpc. We detect sinusoidal pulsations at twice the radio period with a semi-amplitude of 27% ± 5%. The properties of PSR J0726–2612 strongly resemble those of the INSs, except for its much shorter characteristic age of 200 kyr (instead of several Myr). We conclude that PSR J0726–2612 is indeed an example of a young INS, one that started with a magnetic field strength on the low end of those inferred for the INSs, and that, therefore, decayed by a relatively small amount. Our results suggest that the long-period, strong-field pulsars and the INSs are members of the same class, and open up new opportunities to understand the puzzling X-ray and optical emission of the INSs through radio observations of PSR J0726–2612.

  14. THE X-RAY COUNTERPART OF THE HIGH-B PULSAR PSR J0726-2612

    Speagle, J. S.; Kaplan, D. L. [Physics Department, University of Wisconsin-Milwaukee, Milwaukee, WI 53211 (United States); Van Kerkwijk, M. H., E-mail: kaplan@uwm.edu, E-mail: joshuaspeagle@college.harvard.edu, E-mail: mhvk@astro.utoronto.ca [Department of Astronomy and Astrophysics, University of Toronto, 60 St. George Street, Toronto, ON M5S 3H8 (Canada)

    2011-12-20

    Middle-aged, cooling neutron stars are observed both as relatively rapidly spinning radio pulsars and as more slowly spinning, strongly magnetized isolated neutron stars (INSs), which stand out by their thermal X-ray spectra. The difference between the two classes may be that the INSs initially had much stronger magnetic fields, which decayed. To test this, we used the Chandra X-ray Observatory to observe 1RXS J072559.8-261229, a possible X-ray counterpart to PSR J0726-2612, which, with its 3.44 s period and 3 Multiplication-Sign 10{sup 13} G inferred magnetic field strength, is the nearest and least extincted among the possible slowly spinning, strong-field INS progenitors (it likely is in the Gould Belt, at {approx}1 kpc). We confirm the identification and find that the pulsar has a spectrum consistent with being purely thermal, with blackbody temperature kT = 87 {+-} 5 eV and radius R = 5.7{sup +2.6}{sub -1.3} km at a distance of 1 kpc. We detect sinusoidal pulsations at twice the radio period with a semi-amplitude of 27% {+-} 5%. The properties of PSR J0726-2612 strongly resemble those of the INSs, except for its much shorter characteristic age of 200 kyr (instead of several Myr). We conclude that PSR J0726-2612 is indeed an example of a young INS, one that started with a magnetic field strength on the low end of those inferred for the INSs, and that, therefore, decayed by a relatively small amount. Our results suggest that the long-period, strong-field pulsars and the INSs are members of the same class, and open up new opportunities to understand the puzzling X-ray and optical emission of the INSs through radio observations of PSR J0726-2612.

  15. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    1988-01-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff's review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission's regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements

  16. Standard review plan for the review of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    1987-01-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff's review process by interested members of the public and the nuclear power industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission's regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements

  17. SKI's and SSI's joint review of SKB's safety assessment report, SR 97. Summary

    2001-01-01

    results of SR 97 have been applied to formulate requirements and preferences regarding the host rock for a repository. In the authorities' opinion, SR 97 does not include a description of how this has been done. The coupling between safety assessment and site investigation, should be improved. A safety assessment of a repository for spent nuclear fuel will always contain uncertainties and deficiencies in the underlying data. Access to experts who can provide expert judgement is therefore vital. SKB should improve its procedures for obtaining expert judgement. To summarize, the authorities find that parts of the methodology in SR 97 must be further developed and detailed prior to the forthcoming stages of the site selection process. SKB's development of methods for safety assessment is a continuous process that should be conducted throughout all of the stages of the final disposal process. On the basis of the review of SR 97 and previous reviews of SKB's Research, Development and Demonstration programmes the authorities find that the KBS-3 method is an adequate basis for SKB's forthcoming site investigations and for the further development of the engineered barriers. In connection with future reviews of SKB's R, D and D programmes, the authorities intend to present additional views on the reporting that is necessary prior to the different stages of SKB's final disposal programme

  18. Automated discovery of safety and efficacy concerns for joint & muscle pain relief treatments from online reviews.

    Adams, David Z; Gruss, Richard; Abrahams, Alan S

    2017-04-01

    Product issues can cost companies millions in lawsuits and have devastating effects on a firm's sales, image and goodwill, especially in the era of social media. The ability for a system to detect the presence of safety and efficacy (S&E) concerns early on could not only protect consumers from injuries due to safety hazards, but could also mitigate financial damage to the manufacturer. Prior studies in the field of automated defect discovery have found industry-specific techniques appropriate to the automotive, consumer electronics, home appliance, and toy industries, but have not investigated pain relief medicines and medical devices. In this study, we focus specifically on automated discovery of S&E concerns in over-the-counter (OTC) joint and muscle pain relief remedies and devices. We select a dataset of over 32,000 records for three categories of Joint & Muscle Pain Relief treatments from Amazon's online product reviews, and train "smoke word" dictionaries which we use to score holdout reviews, for the presence of safety and efficacy issues. We also score using conventional sentiment analysis techniques. Compared to traditional sentiment analysis techniques, we found that smoke term dictionaries were better suited to detect product concerns from online consumer reviews, and significantly outperformed the sentiment analysis techniques in uncovering both efficacy and safety concerns, across all product subcategories. Our research can be applied to the healthcare and pharmaceutical industry in order to detect safety and efficacy concerns, reducing risks that consumers face using these products. These findings can be highly beneficial to improving quality assurance and management in joint and muscle pain relief. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. Cannabis for therapeutic purposes and public health and safety: a systematic and critical review.

    Sznitman, Sharon R; Zolotov, Yuval

    2015-01-01

    The use of Cannabis for Therapeutic Purposes (CTP) has recently become legal in many places. These policy and legal modifications may be related to changes in cannabis perceptions, availability and use and in the way cannabis is grown and sold. This may in turn have effects on public health and safety. To better understand the potential effects of CTP legalization on public health and safety, the current paper synthesizes and critically discusses the relevant literature. Twenty-eight studies were identified by a comprehensive search strategy, and their characteristics and main findings were systematically reviewed according to the following content themes: CTP and illegal cannabis use; CTP and other public health issues; CTP, crime and neighbourhood disadvantage. The research field is currently limited by a lack of theoretical and methodological rigorous studies. The review shows that the most prevalent theme of investigation so far has been the relation between CTP and illegal cannabis use. In addition, the literature review shows that there is an absence of evidence to support many common concerns related to detrimental public health and safety effects of CTP legalization. Although lack of evidence provides some reassurance that CTP legalization may not have posed a substantial threat to public health and safety, this conclusion needs to be examined in light of the limitations of studies conducted so far. Furthermore, as CTP policy continues to evolve, including incorporation of greater commercialization, it is possible that the full effects of CTP legalization have yet to take place. Ensuring study quality will allow future research to better investigate the complex role that CTP plays in relation to society at large, and public health and safety in particular. Copyright © 2014 Elsevier B.V. All rights reserved.

  20. Review of the safety analysis of the Ignalina Nuclear Power Plant

    Weber, J.P.

    1999-01-01

    Description of the review of safety analysis report (SAR) of Ignalina NPP is presented. this review, called RSR, was conducted by independent group of international experts. SAR and RSR represented a unique international effort in a very short time. It was first attempt to provide Western-type SAR for any Soviet designed NPP. SAR was completed in December 1996, RSR was completed in March 1997. SAR has produced 85 reports, available on CR-ROM and RSR produced 86 reports also available on CD-ROM. SAR presented a large list of recommendations. RSR agreed with most of SAR recommendations and added further recommendations. SAR and RSR contributed significantly to better understanding of RBMK plant behaviour. Ignalina NPP has responded to the SAR/RSR recommendations by an ambitious Safety Improvement Programme SIP-2 which currently is under implementation