  1. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  2. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  3. Preliminary Study on the Revision of Nuclear Safety Policy Statement

    International Nuclear Information System (INIS)

    Lee, Y. E.; Lee, S. H.; Chang, H. S.; Choi, K. S.; Jung, S. J.

    2011-01-01

    Nuclear safety policy in Korea is currently declared in the Nuclear Safety Charter as the highest tier document and safety principles and directions are announced in the Nuclear Safety Policy Statement. As the circumstances affecting on the nuclear safety policy change, it needs to revise the Statement. This study aims to develop the revised Nuclear Safety Policy Statement to declare that securing safety is a prerequisite to the utilization of nuclear energy, and that all workers in nuclear industry and regulatory body must adhere to the principle of priority to safety. As a result, two different types of revision are being prepared as of August. One is based on the spirit of Nuclear Safety Charter as well as the direction of future-oriented safety policies including the changes in the environment after declaration of the Statement. The other is to declare the fundamental safety objective and safety principles as the top philosophy of national nuclear safety policy by adopting the '10 Safety Principles in IAEA Safety Fundamental' instead of the current Charter. Both versions of revision are subject to further in-depth discussion. However once the revision is finalized and declared, it would be useful to accomplish effectively the organizational responsibilities and to enhance the public confidence in nuclear safety by performing the regulatory activities in a planned and systematic manner and promulgating the government's dedication to priority to safety

  4. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.

  5. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    International Nuclear Information System (INIS)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process

  6. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  7. Tank farm health and safety plan. Revision 2

    International Nuclear Information System (INIS)

    Mickle, G.D.

    1995-01-01

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, open-quotes Health and Safety Programs for Hazardous Waste Operations;close quotes 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved

  8. Tank farm health and safety plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Mickle, G.D.

    1995-03-29

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, {open_quotes}Health and Safety Programs for Hazardous Waste Operations;{close_quotes} 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved.

  9. Standard Review Plan for the review of safety analysis reports for nuclear power plants, Revision No. 7 to Section 9

    International Nuclear Information System (INIS)

    1978-03-01

    Revision No. 1 to Section 9 of the Standard Review Plan incorporates changes that have been developed since the original issuance in September 1975, many of which are editorial in nature, to reflect current staff practice in the review of safety analysis reports for nuclear power plants

  10. Safety Evaluation Report on Tennessee Valley Authority: Revised Corporate Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1987-07-01

    The TVA Corporate Nuclear Performance Plan addresses those corporate concerns identified by the NRC staff. Because much of the TVA corporate plan is programmatic, its effectiveness depends on its implementation, and the NRC staff plans to closely monitor this implementation. The NRC staff will address site-specific concerns in subsequent SERs on each volume of the Nuclear Performance Plan. On the basis of its review, the NRC staff finds TVA's revised Corporate Nuclear Performance Plan (Revision 4) acceptable. The NRC staff concludes that the organization and staffing of TVA's Office of Nuclear Power and the programmatic improvements in place or under way are sufficient, if implemented properly, to resolve the problems at the corporate level that led to issuance of the 10 CFR 50.54(f) letter dated September 17, 1985, and to support continuing TVA nuclear activities, including plant operations. 19 refs., 3 figs

  11. High-heat tank safety issue resolution program plan. Revision 2

    International Nuclear Information System (INIS)

    Wang, O.S.

    1994-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank 241-C-106. The heat source of approximately 110,000 Btu/hr is the radioactive decay of the stored waste material (primarily 90 Sr) inadvertently transferred into the tank in the later 1960s. Currently, forced ventilation, with added water to promote thermal conductivity and evaporation cooling, is used for heat removal. The method is very effective and economical. At this time, the only viable solution identified to permanently resolve this safety issue is the removal of heat-generating waste in the tank. This solution is being aggressively pursued as the only remediation method to this safety issue, and tank 241-C-106 has been selected as the first single-shell tank for retrieval. The current cooling method and other alternatives are addressed in this program as means to mitigate this safety issue before retrieval. This program plan has three parts. The first part establishes program objectives and defines safety issue, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and other alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. A table of best-estimate schedules for the key tasks is also included in this program plan

  12. 76 FR 32321 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... approve revisions to the Pennsylvania State Implementation Plan (SIP). The revision consists of a change... prior SIP-approved I/M program to change the duration of the timing of quality assurance audits...

  13. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  14. Implementation plan for the Defense Nuclear Facilities Safety Board Recommendation 90-7

    International Nuclear Information System (INIS)

    Borsheim, G.L.; Cash, R.J.; Dukelow, G.T.

    1992-12-01

    This document revises the original plan submitted in March 1991 for implementing the recommendations made by the Defense Nuclear Facilities Safety Board in their Recommendation 90-7 to the US Department of Energy. Recommendation 90-7 addresses safety issues of concern for 24 single-shell, high-level radioactive waste tanks containing ferrocyanide compounds at the Hanford Site. The waste in these tanks is a potential safety concern because, under certain conditions involving elevated temperatures and low concentrations of nonparticipating diluents, ferrocyanide compounds in the presence of oxidizing materials can undergo a runaway (propagating) chemical reaction. This document describes those activities underway by the Hanford Site contractor responsible for waste tank safety that address each of the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7. This document also identifies the progress made on these activities since the beginning of the ferrocyanide safety program in September 1990. Revised schedules for planned activities are also included

  15. Revised Severe Accident Research Program plan, FY 1990--1992

    International Nuclear Information System (INIS)

    1989-08-01

    For the past 10 years, since the Three Mile Island accident, the NRC has sponsored an active research program on light-water-reactor severe accidents as part of a multi-faceted approach to reactor safety. This report describes the revised Severe Accident Research Program (SARP) and how the revisions are designed to provide confirmatory information and technical support to the NRC staff in implementing the staff's Integration Plan for Closure of Severe Accident Issues as described in SECY-88-147. The revised SARP addresses both the near-term research directed at providing a technical basis upon which decisions on important containment performance issues can be made and the long-term research needed to confirm and refine our understanding of severe accidents. In developing this plan, the staff recognized that the overall goal is to reduce the uncertainties in the source term sufficiently to enable the staff to make regulatory decisions on severe accident issues. However, the staff also recognized that for some issues it may not be practical to attempt to further reduce uncertainties, and some regulatory decisions or conclusions will have to be made with full awareness of existing uncertainties. 2 figs., 1 tab

  16. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  17. Revision of the Euratom basic safety standards directive-current status

    International Nuclear Information System (INIS)

    Mundig, S.

    2011-01-01

    The European Commission is currently developing a revised Euratom Basic Safety Standards (BSS) Directive covering two major objectives: the consolidation of existing Euratom Radiation Protection legislation and the revision of the Euratom BSS. The consolidation will merge the following five Directives into one single Directive: the BSS Directive, the Medical Exposures Directive, the Public Information Directive, the Outside Workers Directive and the Directive on the Control of high-activity sealed radioactive sources and orphan sources. The revision of the Euratom BSS will take account of the latest recommendations by the International Commission on Radiological Protection and shall improve clarity of the requirements where appropriate. It is planned to introduce more binding requirements on natural radiation sources, on criteria for exemption and clearance, and on the cooperation between Member States for emergency planning and response. The provisions for regulatory control of planned exposure situations foresee a graded approach commensurate to the magnitude and likelihood of exposures from a practice. Finally, the new BSS shall take account of recent scientific developments. One additional goal is to achieve greater harmonisation between the Euratom BSS and the international BSS. While the requirements on the protection of workers, apprentices and students remain nearly unchanged, the revised BSS will clarify the roles and responsibilities of services and experts involved in technical and practical aspects of radiation protection, such as the occupational health services, the dosimetry services, the radiation protection expert and the medical physics expert. The requirements in the BSS on individual monitoring of category A workers remain unchanged, but the existing guidance on individual monitoring was revised and updated-the technical recommendations for monitoring individuals occupationally exposed to external radiation are published by the European

  18. Plan-Belief Revision in Jason

    DEFF Research Database (Denmark)

    Jensen, Andreas Schmidt; Villadsen, Jørgen

    2015-01-01

    When information is shared between agents of unknown reliability, it is possible that their belief bases become inconsistent. In such cases, the belief base must be revised to restore consistency, so that the agent is able to reason. In some cases the inconsistent information may be due to use of...... of incorrect plans. We extend work by Alechina et al. to revise belief bases in which plans can be dynamically added and removed. We present an implementation of the algorithm in the AgentSpeak implementation Jason....

  19. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  20. 75 FR 6413 - Office of New Reactors; Proposed Revision to Standard Review Plan, Section 14.3.12 on Physical...

    Science.gov (United States)

    2010-02-09

    ... Standard Review Plan, Section 14.3.12 on Physical Security Hardware Inspections, Tests, Analyses, and.... SUMMARY: The NRC is soliciting public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' on a proposed Revision 1 to Standard Review Plan (SRP...

  1. Nuclear safety guide: TID--7016, Revision 2

    International Nuclear Information System (INIS)

    Thomas, J.T.

    1978-01-01

    The Nuclear Safety Guide was first issued in 1956 as classified AEC report LA-2063 and was reprinted the next year, unclassified, as TID-7016. Revision 1, published in 1961, extended the scope and refined the guiding information. Revision 2 of the Guide differs significantly from its predecessor in that the latter was intentionally conservative in its recommendations. Firmly based on experimental evidence of criticality, the original Guide and the first revision were considered to be of most value to organizations whose activities with fissionable materials were not extensive and, secondarily, that it would serve as a point of departure for members of established nuclear safety teams experienced in the field. The advance of calculational capability has permitted validated calculations to extend and substitute for experimental data. The broadened data base has enabled better interpolation, extension, and understanding of available information, especially in areas previously addressed by undefined but adequate factors of safety. The content has been thereby enriched in qualitative guidance. The information inherently contains, and the user can recapture, the quantitative guidance characteristic of the former Guides by employing appropriate safety factors

  2. US Nuclear Regulatory Commission Human Factors Program Plan. Revision 1

    International Nuclear Information System (INIS)

    1984-09-01

    The purpose of the NRC Human Factors Program Plan (NUREG-0985) is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This revised plan addresses nuclear power plants (NPPs) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, THE NRC Action Plan developed as a result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention; (3) conduct of developmental activities specified in NUREG-0985 during FY-83; and (4) the impact of Section 306 of the Nuclear Waste Policy Act of 1982, PL 97-425. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-84 through FY-86 time frame

  3. Education and training requirements in the revised European Basic Safety Standards Directive

    International Nuclear Information System (INIS)

    Mundigl, S.

    2009-01-01

    The European Commission is currently developing a modified European Basic Safety Standards Directive covering two major objectives: the consolidation of existing European Radiation Protection legislation, and the revision of the European Basic Safety Standards. The consolidation will merge the following five Directives into one single Directive: the Basic Safety Standards Directive, the Medical Exposures Directive, the Public Information Directive, the Outside Workers Directive, and the Directive on the Control of high-activity sealed radioactive sources and orphan sources. The revision of the European Basic Safety Standards will take account of the latest recommendations by the International Commission on Radiological Protection (ICRP) and shall improve clarity of the requirements where appropriate. It is planned to introduce more binding requirements on natural radiation sources, on criteria for clearance, and on the cooperation between Member States for emergency planning and response, as well as a graded approach for regulatory control. One additional goal is to achieve greater harmonisation between the European BSS and the international BSS. Following a recommendation from the Article 31 Group of Experts, the current draft of the modified BSS will highlight the importance of education and training by dedicating a specific title to radiation protection education, training and information. This title will include a general requirement on the Member States to ensure the establishment of an adequate legislative and administrative framework for providing appropriate radiation protection education, training and information. In addition, there will be specific requirements on training in the medical field, on information and training of workers in general, of workers potentially exposed to orphan sources, and to emergency workers. The revised BSS directive will include requirements on the competence of a radiation protection expert (RPE) and of a radiation protection

  4. 76 FR 32333 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania for the purpose of changing the...). Specifically, the Commonwealth is amending a provision of its prior SIP-approved I/M program to amend the...

  5. Nuclear safety guide. TID-7016, Revision 2

    International Nuclear Information System (INIS)

    Thomas, J.T.

    1978-01-01

    The Nuclear Safety Guide was first issued in 1956 as classified AEC report LA-2063 and was reprinted the next year, unclassified, as TID-7016. Revision 1, published in 1961, extended the scope and refined the guiding information. The present revision of the Guide differs significantly from its predecessor in that the latter was intentionally conservative in its recommendations. Firmly based on experimental evidence of criticality, the original Guide and the first revision were considered to be of most value to organizations whose activities with fissionable materials were not extensive and, secondarily, that it would serve as a point of departure for members of established nuclear safety teams, experienced in the field. The reader will find a significant change in the character of information presented in this version. Nuclear Criticality Safety has matured in the past twelve years. The advance of calculational capability has permitted validated calculations to extend and substitute for experimental data. The broadened data base has enabled better interpolation, extension, and understanding of available information, especially in areas previously addressed by undefined but adequate factors of safety. The content has been thereby enriched in qualitative guidance. The information inherently contains, and the user can recapture, the quantitative guidance characteristic of the formerGuides by employing appropriate safety factors. In fact, it becomes incumbent on the Criticality Safety Specialist to necessarily impose safety factors consistent with the possible normal and abnormal credible contingencies of an operation as revealed by his evaluation. In its present form the Guide easily becomes a suitable module in any compendium or handbook tailored for internal use by organizations. It is hoped the Guide will continue to serve immediate needs and will encourage continuing and more comprehensive efforts toward organizing nuclear criticality safety information

  6. Nuclear safety guide. TID-7016, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, J T [ed.

    1978-05-01

    The Nuclear Safety Guide was first issued in 1956 as classified AEC report LA-2063 and was reprinted the next year, unclassified, as TID-7016. Revision 1, published in 1961, extended the scope and refined the guiding information. The present revision of the Guide differs significantly from its predecessor in that the latter was intentionally conservative in its recommendations. Firmly based on experimental evidence of criticality, the original Guide and the first revision were considered to be of most value to organizations whose activities with fissionable materials were not extensive and, secondarily, that it would serve as a point of departure for members of established nuclear safety teams, experienced in the field. The reader will find a significant change in the character of information presented in this version. Nuclear Criticality Safety has matured in the past twelve years. The advance of calculational capability has permitted validated calculations to extend and substitute for experimental data. The broadened data base has enabled better interpolation, extension, and understanding of available information, especially in areas previously addressed by undefined but adequate factors of safety. The content has been thereby enriched in qualitative guidance. The information inherently contains, and the user can recapture, the quantitative guidance characteristic of the formerGuides by employing appropriate safety factors. In fact, it becomes incumbent on the Criticality Safety Specialist to necessarily impose safety factors consistent with the possible normal and abnormal credible contingencies of an operation as revealed by his evaluation. In its present form the Guide easily becomes a suitable module in any compendium or handbook tailored for internal use by organizations. It is hoped the Guide will continue to serve immediate needs and will encourage continuing and more comprehensive efforts toward organizing nuclear criticality safety information.

  7. Safety research basic plan of JNC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Japan Nuclear Cycle Development Institute (JNC) formally succeeded to Power Reactor and Nuclear Fuel Development Corporation (PNC) on October, 1 1998. This report describes the basic plan for major program of JNC which consists of two parts: management philosophy of the new institute and the latest revised medium term program. In the first part, the primary mission of JNC is to perform its R and D concentrating on fast breeder reactor and its fuel cycle, and treatment and disposal of high-level radioactive wastes, while at the same time giving special consideration to safety. In the second, individual programs in the new basic plan are discussed in detail. The outline and schedule of each program are also attached in the table form. (H. Itami)

  8. 9 CFR 108.6 - Revision of plot plans, blueprints, and legends.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Revision of plot plans, blueprints... FACILITY REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.6 Revision of plot plans, blueprints, and legends... changes affecting the workflow are to be made. The licensee shall: (a) Prepare revised plot plans...

  9. Revised technical regulations on radiation protection and safety of 30 September 1975

    International Nuclear Information System (INIS)

    1975-01-01

    These revised technical regulations were made in implementation of Section 4 of Decree No 7/9038 of 30 November 1974 on radiation health and safety and lay down in detail the requirements to be met in Turkey for the use of all types of radiation sources. They set out protection plans and specify the protective equipment to be used as well as the controlled areas, i.e. areas in which radiation sources are used and which must be subject to special safety measures. Finally to obtain a license, users of radiation sources must fill in forms, the models of which are provided, giving their particulars and the specifications of the intended use and activity of the sources. (NEA) [fr

  10. Nuclear safety guide TID-7016 Revision 2

    International Nuclear Information System (INIS)

    Thomas, J.T.

    1980-01-01

    The present revision of TID-7016 Nuclear Safety Guide is discussed. This Guide differs significantly from its predecessor in that the latter was intentionally conservative in its recommendations. Firmly based on experimental evidence of criticality, the original Guide and the first revision were considered to be of most value to organizations whose activities with fissionable materials were not extensive and, secondarily, that it would serve as a point of departure for members of established nuclear safety teams, experienced in the field. The reader will find a significant change in the character of information presented in this version. Nuclear Criticality Safety has matured in the past twelve years. The advance of calculational capability has permitted validated calculations to extend and substitute for experimental data. The broadened data base has enabled better interpolation, extension, and understanding of available, information, especially in areas previously addressed by undefined but adequate factors of safety. The content has been thereby enriched in qualitative guidance. The information inherently contains, and the user can recapture, the quantitative guidance characteristic of the former Guides by employing appropriate safety factors. In fact, it becomes incumbent on the Criticality Safety Specialist to necessarily impose safety factors consistent with the possible normal and abnormal credible contingencies of an operation as revealed by his evaluation. In its present form the Guide easily becomes a suitable module in any compendium or handbook tailored for internal use by organizations. It is hoped the Guide will continue to serve immediate needs and will encourage continuing and more comprehensive efforts toward organizing nuclear criticality safety information

  11. Tank safety screening data quality objective. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, J.W.

    1995-04-27

    The Tank Safety Screening Data Quality Objective (DQO) will be used to classify 149 single shell tanks and 28 double shell tanks containing high-level radioactive waste into safety categories for safety issues dealing with the presence of ferrocyanide, organics, flammable gases, and criticality. Decision rules used to classify a tank as ``safe`` or ``not safe`` are presented. Primary and secondary decision variables used for safety status classification are discussed. The number and type of samples required are presented. A tabular identification of each analyte to be measured to support the safety classification, the analytical method to be used, the type of sample, the decision threshold for each analyte that would, if violated, place the tank on the safety issue watch list, and the assumed (desired) analytical uncertainty are provided. This is a living document that should be evaluated for updates on a semiannual basis. Evaluation areas consist of: identification of tanks that have been added or deleted from the specific safety issue watch lists, changes in primary and secondary decision variables, changes in decision rules used for the safety status classification, and changes in analytical requirements. This document directly supports all safety issue specific DQOs and additional characterization DQO efforts associated with pretreatment and retrieval. Additionally, information obtained during implementation can assist in resolving assumptions for revised safety strategies, and in addition, obtaining information which will support the determination of error tolerances, confidence levels, and optimization schemes for later revised safety strategy documentation.

  12. 42 CFR 456.523 - Revised UR plan.

    Science.gov (United States)

    2010-10-01

    ... control over the utilization of services; and (2) Conducts reviews in a way that improves the quality of...) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Review Plans: FFP, Waivers, and Variances for Hospitals and Mental Hospitals Ur Plan: Remote Facility Variances from Time Requirements § 456.523 Revised...

  13. Revised Safety Instruction 41 (IS41 REV.)

    CERN Multimedia

    SC Secretariat

    2005-01-01

    Please note that the Revised Safety Instruction No. 41 (IS41 REV.), entitled 'The use of plastic and other non-metallic materials at CERN with respect to fire safety and radiation resistance' is available on the web at the following url: https://edms.cern.ch/document/335806/LAST_RELEASED Paper copies can also be obtained from the SC Unit Secretariat, e-mail: sc.secretariat@cern.ch SC Secretariat

  14. Safety evaluation report on Tennessee Valley Authority: Browns Ferry nuclear performance plan

    International Nuclear Information System (INIS)

    1989-10-01

    This safety evaluation report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Nuclear Performance Plan, through Revision 2, for the Browns Ferry Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory commission staff. The Browns Ferry Nuclear Plant consists of three boiling-water reactors at a site in Limestone County, Alabama. The plan addresses the plant-specific concerns requiring resolution before the startup of Unit 2. The staff will inspect implementation of those TVA programs that address these concerns. Where systems are common to Units 1 and 2 or to Units 2 and 3, the staff safety evaluations of those systems are included herein. 85 refs

  15. Waste convention regulatory impact on planning safety assessment for LILW disposal in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Lokner, V.

    2000-01-01

    Preparations for establishment of a LILW repository in Croatia have reached a point where a preliminary safety assessment for the prospective facility is being planned. The planning is not based upon the national regulatory framework, which does not require such an assessment at this early stage, but upon the interagency BSS and the IAEA RADWASS programme recommendations because the national regulations are being revised with express purpose to conform to the most recent international standards and good practices. The Waste Convention, which Croatia has ratified in the meantime, supports this approach in principle, but does not appear to have more tangible regulatory relevance for the safety assessment planning. Its actual requirements regarding safety analyses for a repository fall short of the specific assessment concepts practiced in this decade, and could have well been met by the old Croatian regulations from the mid-eighties. (author)

  16. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  17. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  18. The development and revision of the Federal Radiological Emergency Response Plan

    International Nuclear Information System (INIS)

    Gant, K.S.; Adler, M.V.; Wolff, W.F.

    1989-01-01

    Since 1985, federal agencies have been using the Federal Radiological Emergency Response Plan (FRERP) in exercises and real events. This experience and the development of other emergency response guidance (e.g., National System for Emergency Coordination) are fueling current efforts to review and revise the FRERP to reflect what the agencies have learned since the FRERP was published. Revision efforts are concentrating on clarifying the plan and addressing deficiencies. No major changes are expected in the general structure of the federal response nor should states need to revise their plans because of these modifications. 5 refs

  19. 200 area liquid effluent facility quality assurance program plan. Revision 1

    International Nuclear Information System (INIS)

    Sullivan, N.J.

    1995-01-01

    Direct revision of Supporting Document WHC-SD-LEF-QAPP-001, Rev. 0. 200 Area Liquid Effluent Facilities Quality Assurance Program Plan. Incorporates changes to references in tables. Revises test to incorporate WHC-SD-LEF-CSCM-001, Computer Software Configuration Management Plan for 200 East/West Liquid Effluent Facilities

  20. Revised health and safety compliance model for the Ghanaian ...

    African Journals Online (AJOL)

    The construction industry in Ghana is faced with employees' negligence in obeying rules and regulations, and acts that conflict with health and safety. The purpose of the paper was to present the revised health and safety (H&S) compliance model for the construction industry based on a developed theoretical six factor ...

  1. The emergency plan of the ININ; El plan de emergencia del ININ

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz C, M A [ININ, Salazar, Estado de Mexico (Mexico)

    1991-07-01

    The emergency plan of the ININ, it was elaborated in 1988 and revised by the National Commission of Nuclear Safety and Safeguards (CNSNS) in 1989. At the beginning of 1990 and with the support of the IAEA it was practiced the first revision to the text of this plan, for what the proposal revision is what constitutes the development of this report.

  2. Nuclear fuel reprocessing deactivation plan for the Idaho Chemical Processing Plant, Revision 1

    International Nuclear Information System (INIS)

    Patterson, M.W.

    1994-10-01

    The decision was announced on April 28, 1992 to cease all United States Department of Energy (DOE) reprocessing of nuclear fuels. This decision leads to the deactivation of all fuels dissolution, solvent extraction, krypton gas recovery operations, and product denitration at the Idaho Chemical Processing Plant (ICPP). The reprocessing facilities will be converted to a safe and stable shutdown condition awaiting future alternate uses or decontamination and decommissioning (D ampersand D). This ICPP Deactivation Plan includes the scope of work, schedule, costs, and associated staffing levels necessary to achieve a safe and orderly deactivation of reprocessing activities and the Waste Calcining Facility (WCF). Deactivation activities primarily involve shutdown of operating systems and buildings, fissile and hazardous material removal, and related activities. A minimum required level of continued surveillance and maintenance is planned for each facility/process system to ensure necessary environmental, health, and safety margins are maintained and to support ongoing operations for ICPP facilities that are not being deactivated. Management of the ICPP was transferred from Westinghouse Idaho Nuclear Company, Inc. (WINCO) to Lockheed Idaho Technologies Company (LITCO) on October 1, 1994 as part of the INEL consolidated contract. This revision of the deactivation plan (formerly the Nuclear Fuel Reprocessing Phaseout Plan for the ICPP) is being published during the consolidation of the INEL site-wide contract and the information presented here is current as of October 31, 1994. LITCO has adopted the existing plans for the deactivation of ICPP reprocessing facilities and the plans developed under WINCO are still being actively pursued, although the change in management may result in changes which have not yet been identified. Accordingly, the contents of this plan are subject to revision

  3. Safety Evaluation Report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan: Browns Ferry Unit 2 restart

    International Nuclear Information System (INIS)

    1989-04-01

    This safety evaluation report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Nuclear Performance Plan, through Revision 2, for the Browns Ferry Nuclear Power Station and in supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific concerns requiring resolution before startup of Unit 2. The staff will inspect implementation of those programs. Where systems are common to Units 1 and 2 or to Units 2 and 3, the staff safety evaluations of those systems are included herein. 3 refs

  4. Annual plan of research on safety techniques against low level radioactive wastes, 1984-1988

    International Nuclear Information System (INIS)

    1984-01-01

    The establishment of the countermeasures for treating and disposing radioactive wastes has become an important subject for promoting the utilization of atomic energy. Especially as to low level radioactive wastes, the cumulative quantity has reached about 460,000 in terms of 200 l drums as of the end of March, 1983, and accompanying the development of the utilization of atomic energy, its rapid increase is expected. So far, as for the disposal of low level radioactive wastes, the research and development and the preparation of safety criteria and safety evaluation techniques have been carried out, following the basic policy of the Atomic Energy Commission to execute land disposal and ocean disposal in combination, first to make the test disposal after preliminary safety evaluation, and to shift to the full scale disposal based on the results. The annual plan was decided on July 22, 1983, and the first revision was carried out this time, therefore, it is reported here. The basic policy of establishing this annual plan, and the annual plan for safety technique research are described. (Kako, I.)

  5. Safety assessment for the 118-B-1 Burial Ground excavation treatability tests. Revision 2

    International Nuclear Information System (INIS)

    Zimmer, J.J.; Frain, J.M.

    1994-12-01

    This revision of the Safety Assessment provides an auditable safety analysis of the hazards for the proposed treatability test activities per DOE-EM-STD-5502-94, DOE Limited Standard, Hazard Baseline Documentation (DOE 1994). The proposed activities are classified as radiological activities and as such, no longer require Operational Safety Limits (OSLs). The OSLS, Prudent Actions, and Institutional and Organization Controls have been removed from this revision and replaced with ''Administrative Actions Important to Safety,'' as determined by the hazards analysis. Those Administrative Actions Important to Safety are summarized in Section 1.1, ''Assessment Summary.''

  6. 40 CFR 256.03 - State plan submission, adoption, and revision.

    Science.gov (United States)

    2010-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements, Definitions § 256.03 State plan submission, adoption, and revision. (a) To be...

  7. Mixed Waste Management Facility, revised FY94 Plan

    International Nuclear Information System (INIS)

    Streit, R.

    1994-01-01

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94

  8. 78 FR 61251 - The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and...

    Science.gov (United States)

    2013-10-03

    ...-0030] RIN 2132-AB20; 2132-AB07 The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and the Public Transportation Safety Certification Training Program; Transit... Public Transportation Safety Program (National Safety Program) and the requirements of the new transit...

  9. Carlsbad Area Office strategic plan, March 1995. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This edition of the Carlsbad Area Office Strategic Plan captures the US Department of Energy's (DOE's) new focus, and supersedes the edition issued previously (DOE, 1993a). This revision reflects: a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on establishment of standardized transuranic waste characterization and acceptance criteria for disposal facilities

  10. 76 FR 13511 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... approve revisions to the Virginia State Implementation Plan (SIP). The revisions recodify the open burning... approving these revisions to Virginia's open burning regulations in accordance with the requirements of the...

  11. Seismic safety margin research program. Program plan, Revision I

    International Nuclear Information System (INIS)

    Smith, P.D.; Tokarz, F.J.; Bernreuter, D.L.; Cummings, G.E.; Chou, C.K.; Vagliente, V.N.

    1978-01-01

    The overall objective of the SSMRP is to develop mathematical models that realistically predict the probability of radioactive releases from seismically induced events in nuclear power plants. These models will be used for four purposes: (1) To perform sensitivity studies to determine the weak links in seismic methodology. The weak links will then be improved by research and development. (2) To estimate the probability of release for a plant. It is believed that the major difficulty in the program will be to obtain acceptably small confidence limits on the probability of release. (3) To estimate the conservatisms in the Standard Review Plan (SRP) seismic design methodology. This will be done by comparing the results of the SRP methodology and the methodology resulting from the research and development in (1). (4) To develop an improved seismic design methodology based on probability. The Phase I objective proposed in this report is to develop mathematical models which will accomplish the purposes No. 1 and No. 2 with simplified assumptions such as linear elastic analysis, limited assessment on component fragility (considering only accident sequences leading to core melt), and simplified safety system

  12. 29 CFR 1915.502 - Fire safety plan.

    Science.gov (United States)

    2010-07-01

    ... implement a written fire safety plan that covers all the actions that employers and employees must take to ensure employee safety in the event of a fire. (See Appendix A to this subpart for a Model Fire Safety... safety plan for their employees, and this plan must comply with the host employer's fire safety plan. ...

  13. 77 FR 24148 - Revision to the Hawaii State Implementation Plan, Minor New Source Review Program

    Science.gov (United States)

    2012-04-23

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0213; FRL-9661-6] Revision to the Hawaii State Implementation Plan, Minor New Source Review Program AGENCY: Environmental Protection Agency... final action to approve revisions to the Hawaii State Implementation Plan (SIP). These revisions would...

  14. The emergency plan of the ININ

    International Nuclear Information System (INIS)

    Ruiz C, M.A.

    1991-01-01

    The emergency plan of the ININ, it was elaborated in 1988 and revised by the National Commission of Nuclear Safety and Safeguards (CNSNS) in 1989. At the beginning of 1990 and with the support of the IAEA it was practiced the first revision to the text of this plan, for what the proposal revision is what constitutes the development of this report

  15. Planning Facilities for Athletics, Physical Education and Recreation. Revised.

    Science.gov (United States)

    American Alliance for Health, Physical Education, Recreation and Dance (AAHPERD).

    This revised edition includes new material recommended by a panel of experts in the field of recreational planning. The following topics are covered: (1) the planning process; (2) indoor facilities; (3) outdoor facilities; (4) indoor and outdoor swimming pools; (5) encapsulated spaces and stadiums; (6) service areas; (7) recreation and park…

  16. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  17. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  18. DWPF waste form compliance plan (Draft Revision)

    International Nuclear Information System (INIS)

    Plodinec, M.J.; Marra, S.L.

    1991-01-01

    The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970's, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan

  19. Safety evaluation report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This safety evaluation report (SER) was prepared by the US Nuclear Regulatory Commission (NRC) staff and represents the second and last supplement (SSER 2) to the staff's original SER published as Volume 3 of NUREG-1232 in April 1989. Supplement 1 of Volume 3 of NUREG-1232 (SSER 1) was published in October 1989. Like its predecessors, SSER 2 is composed of numerous safety evaluations by the staff regarding specific elements contained in the Browns Ferry Nuclear Performance Plan (BFNPP), Volume 3 (up to and including Revision 2), submitted by the Tennessee Valley Authority (TVA) for the Browns Ferry Nuclear Plant (BFN). The Browns Ferry Nuclear Plant consists of three boiling-water reactors (BWRs) at a site in Limestone County, Alabama. The BFNPP describes the corrective action plans and commitments made by TVA to resolve deficiencies with its nuclear programs before the startup of Unit 2. The staff has inspected and will continue to inspect TVA's implementation of these BFNPP corrective action plans that address staff concerns about TVA's nuclear program. SSER 2 documents the NRC staff's safety evaluations and conclusions for those elements of the BFNPP that were not previously addressed by the staff or that remained open as a result of unresolved issues identified by the staff in previous SERs and inspections

  20. 40 CFR 30.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 30.25 Revision of budget and program plans. (a) The budget plan is the financial...

  1. 45 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  2. 20 CFR 435.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  3. 38 CFR 49.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  4. 45 CFR 2543.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  5. 22 CFR 145.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... Section 145.25 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 145.25 Revision of budget and program plans. (a) The budget plan is the...

  6. 28 CFR 70.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  7. 22 CFR 518.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...

  8. 15 CFR 14.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  9. 78 FR 34703 - Pipeline Safety: Information Collection Activities, Revision to Gas Distribution Annual Report

    Science.gov (United States)

    2013-06-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0004] Pipeline Safety: Information Collection Activities, Revision to Gas Distribution Annual Report AGENCY: Pipeline and Hazardous Materials Safety Administration, DOT. ACTION: Notice and request...

  10. 76 FR 13569 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia. The revisions recodify the open... . C. Mail: EPA-R03-OAR-2010-0902, Harold A. Frankford, Air Protection Division, Mailcode 3AP00, U.S...

  11. 34 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It may...

  12. 78 FR 73692 - Revisions to Safety Standards for Infant Bath Seats, Toddler Beds, and Full-Size Baby Cribs

    Science.gov (United States)

    2013-12-09

    ... standard issued under the Danny Keysar Child Product Safety Notification Act was based, the revision... standard. Section 26(c) of the CPSA also provides that states or political subdivisions of states may apply... CONSUMER PRODUCT SAFETY COMMISSION 16 CFR Parts 1215, 1217 and 1219 Revisions to Safety Standards...

  13. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  14. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  15. Children's high-level writing skills: development of planning and revising and their contribution to writing quality.

    Science.gov (United States)

    Limpo, Teresa; Alves, Rui A; Fidalgo, Raquel

    2014-06-01

    It is well established that the activity of producing a text is a complex one involving three main cognitive processes: Planning, translating, and revising. Although these processes are crucial in skilled writing, beginning and developing writers seem to struggle with them, mainly with planning and revising. To trace the development of the high-level writing processes of planning and revising, from Grades 4 to 9, and to examine whether these skills predict writing quality in younger and older students (Grades 4-6 vs. 7-9), after controlling for gender, school achievement, age, handwriting fluency, spelling, and text structure. Participants were 381 students from Grades 4 to 9 (age 9-15). Students were asked to plan and write a story and to revise another story by detecting and correcting mechanical and substantive errors. From Grades 4 to 9, we found a growing trend in students' ability to plan and revise despite the observed decreases and stationary periods from Grades 4 to 5 and 6 to 7. Moreover, whereas younger students' planning and revising skills made no contribution to the quality of their writing, in older students, these high-level skills contributed to writing quality above and beyond control predictors. The findings of this study seem to indicate that besides the increase in planning and revising, these skills are not fully operational in school-age children. Indeed, given the contribution of these high-level skills to older students' writing, supplementary instruction and practice should be provided from early on. © 2013 The British Psychological Society.

  16. 77 FR 76065 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm...

    Science.gov (United States)

    2012-12-26

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm Springs Dace... revised recovery plan for the Kendall Warm Springs dace (Rhinichthys osculus thermalis). This species is... recovery plan. The Kendall Warm Springs dace (Rhinichthys osculus thermalis), found only in one location in...

  17. Philippines revises power plans

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, D.

    1988-02-01

    Following an unexpected surge in electricity demand the Philippines has revised its medium term power development programme. The sharp increase in electricity consumption follows three years of slack demand due to civil disturbances before the end of the Macros administration and the election of Corazon Aquino as President in 1986. Originally, the Aquino government's medium term power development plans called for about 500MW of generating capacity to be installed between 1986 and 1992. The three proposed plants were scheduled for commissioning in 1991 and 1992. However, a spurt in power demand growth during the past nine months has caused concern among industrialists that power shortages could occur by the end of the decade. So additional capacity will be installed to prevent an anticipated shortfall in electricity supplies by the early 1990s.

  18. Safety Evaluation report on Tennessee Valley Authority: Sequoyah nuclear performance plan

    International Nuclear Information System (INIS)

    1988-05-01

    This Safety Evaluation Report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Sequoyah Nuclear Performance Plan, through Revision 2, and supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific concerns requiring resolution before startup of either of the Sequoyah units. In particular, the SER addresses required actions for Unit 2 restart. In many cases, the programmatic aspects for Unit 1 are identical to those for Unit 2; the staff will conduct inspections of implementation of those programs. Where the Unit 1 program is different, the staff evaluation will be provided in a supplement to this SER. On the basis of its review, the staff concludes that Sequoyah-specific issues have been resolved to the extent that would support restart of Sequoyah Unit 2

  19. Safety analysis on Non-LOCA events for the revision of Wolsong NPP unit 2,3,4 sar

    International Nuclear Information System (INIS)

    Kim, Jong Hyun; Jin, Dong Sik; Ryu, Eui Seung; Kho, Dong Wook; Kim, Sung Min

    2015-01-01

    Korean Wolsong Nuclear Power Plant Units 2,3,4 (CANDU-6 Type) has prepared the revision of safety analysis report (Final Safety Analysis Report (FSAR) chapter 15) from the original performed in the year of 1990s, using the updated and state-of-the-art methodology and tools including IST safety analysis codes and more detail modelling. Compared with the original FSAR15, the revised FSAR15 has significant improvement in both the scope and the depth of safety analysis, which has demonstrated the safety analysis results have complied with the safety requirements(acceptance criteria). This paper will present the analysis scope for Non-LOCA events re-analyzed or added for the FSAR15 revision, methodologies applied such as codes and modelling and some important analysis results will be demonstrated with comparison to acceptance criteria. Application of more detail and near-realistic assumptions and method including Dev-PDO options and uncertainty related to the CHF correlations has altogether brought about more safety margin compared with the original FSAR15 with respect to SDS trip effectiveness etc. (author)

  20. Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1997-05-01

    Plugging and abandonment (P ampersand A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P ampersand A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P ampersand A, the technical methods employed to perform P ampersand A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P ampersand A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P ampersand A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P ampersand A schedule be maintained. Wells are added to this list by issuance of both a P ampersand A request and a P ampersand A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P ampersand A has been developed and the plan revised to formalize the new business practices

  1. Maine highway safety plan

    Science.gov (United States)

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  2. A tailored online safety and health intervention for women experiencing intimate partner violence: the iCAN Plan 4 Safety randomized controlled trial protocol

    Directory of Open Access Journals (Sweden)

    Marilyn Ford-Gilboe

    2017-03-01

    Full Text Available Abstract Background Intimate partner violence (IPV threatens the safety and health of women worldwide. Safety planning is a widely recommended, evidence-based intervention for women experiencing IPV, yet fewer than 1 in 5 Canadian women access safety planning through domestic violence services. Rural, Indigenous, racialized, and immigrant women, those who prioritize their privacy, and/or women who have partners other than men, face unique safety risks and access barriers. Online IPV interventions tailored to the unique features of women’s lives, and to maximize choice and control, have potential to reduce access barriers, and improve fit and inclusiveness, maximizing effectiveness of these interventions for diverse groups. Methods/Design In this double blind randomized controlled trial, 450 Canadian women who have experienced IPV in the previous 6 months will be randomized to either a tailored, interactive online safety and health intervention (iCAN Plan 4 Safety or general online safety information (usual care. iCAN engages women in activities designed to increase their awareness of safety risks, reflect on their plans for their relationships and priorities, and create a personalize action plan of strategies and resources for addressing their safety and health concerns. Self-reported outcome measures will be collected at baseline and 3, 6, and 12 months post-baseline. Primary outcomes are depressive symptoms (Center for Epidemiological Studies Depression Scale, Revised and PTSD Symptoms (PTSD Checklist, Civilian Version. Secondary outcomes include helpful safety actions, safety planning self-efficacy, mastery, and decisional conflict. In-depth qualitative interviews with approximately 60 women who have completed the trial and website utilization data will be used to explore women’s engagement with the intervention and processes of change. Discussion This trial will contribute timely evidence about the effectiveness of online safety and

  3. 77 FR 22387 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-04-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  4. 77 FR 58616 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  5. A prioritization of generic safety issues. Supplement 19, Revision insertion instructions

    International Nuclear Information System (INIS)

    1995-11-01

    The report presents the safety priority ranking for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The safety priority rankings are HIGH, MEDIUM, LOW, and DROP, and have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolution of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors. To the extent practical, estimates are quantitative. This document provides revisions and amendments to the report

  6. A prioritization of generic safety issues. Supplement 19, Revision insertion instructions

    Energy Technology Data Exchange (ETDEWEB)

    None

    1995-11-01

    The report presents the safety priority ranking for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The safety priority rankings are HIGH, MEDIUM, LOW, and DROP, and have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolution of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors. To the extent practical, estimates are quantitative. This document provides revisions and amendments to the report.

  7. 78 FR 17632 - Caribou-Targhee National Forest; Idaho and Wyoming; Amendment to the Targhee Revised Forest Plan...

    Science.gov (United States)

    2013-03-22

    ...; Amendment to the Targhee Revised Forest Plan--Canada Lynx Habitat AGENCY: Forest Service, USDA. ACTION... Forest proposes to amend the Targhee Revised Forest Plan (1997) to include a map identifying specific... Administrative Review Process: The decision on this proposed plan amendment will be subject to the objection...

  8. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  9. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  10. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  11. Chemical Hygiene and Safety Plan

    Energy Technology Data Exchange (ETDEWEB)

    Berkner, K.

    1992-08-01

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through training and the Plan will serve as a the framework and reference guide for that training.

  12. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  13. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  14. The revision of the safety standards for protection against ionizing radiation

    International Nuclear Information System (INIS)

    Wei Li Chen; Hsiao Ping Wang; Chia Chun Liao; Chin Shiun Yeh

    1994-01-01

    The Chinese Safety Standards for Protection Against Ionizing Radiation was issued on July 29, 1970, and has been used for more than thirteen years. In 1983, the Atomic Energy Council (AEC) decided to revise it accordingly to the recommendations of the International Commission on Radiological Protection and the experiences of regulation enforcement in Taiwan and other countries. The AEC assembled a task group of eight members from academic institutions, licensees, government agency, and senior health physics to be in charge of the revision. In this presentation the major changes of the Safety Standards are summarized. They refer to the adoption of the system of dose limitation recommended by ICRP publication 26 and 30, the use of the units of the International System as the primary units with the old units being noted in parentheses, the adoption of the minimums levels recommended by the International Atomic Energy Agency and the setting up of an executive regulatory system for the implementation of the ALARA concept. 6 refs

  15. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  16. Revised action plan of the Maintenance division for 1965, Annex 4

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-01-01

    The action plan presented in this annex is a revised version of the plan adopted in January 1965. It includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building [sr

  17. Revision of AESJ standard 'the code of implemnetation of periodic safety review of nuclear power plants'

    International Nuclear Information System (INIS)

    Hirano, Masashi; Narumiya, Yoshiyuki

    2010-01-01

    The Periodic Safety Review (PSR) was launched in June 1992, when the Agency for Natural Resources and Energy issued a notification that required licensees to conduct comprehensive review on the safety of each existing nuclear power plant (NPP) once approximately every ten years based on the latest technical findings for the purpose of improving the safety of the NPP. In 2006, the Standard Committee of the Atomic Energy Society of Japan established the first version of 'The Standard of Implementation for Periodic Safety Review of Nuclear Power Plants: 2006'. Taking into account developments in safety regulation of PSR after the issuance of the first version, the Standard Committee has revised the Standard. This paper summarizes background on PSR, such developments are major contents of the Standard as well as the focal points of the revision. (author)

  18. U.S. Btu tax plan revised; industry wary of results

    International Nuclear Information System (INIS)

    Crow, P.

    1993-01-01

    The Clinton administration has changed its U.S. energy tax proposal to remove some objection voiced by industry and consumers. The Treasury Department's revised plan will still tax oil products at double the rate of other types of energy except for home heating oil, which now is to be taxed at the lower rate for natural gas. Of major importance to California producers, the revision will not tax natural gas used in enhanced recovery for heavy oil. This paper describes exemptions; effects on natural gas; the credibility gap; inhibition of gas market recovery; tax on NGL; and forecasting the future

  19. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5

  20. Engineering task plan for the annual revision of the rotary mode core sampling system safety equipment list

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan addresses an effort to provide an update to the RMCS Systems 3 and 4 SEL and DCM in order to incorporate the changes to the authorization basis implemented by HNF-SD-WM-BIO-001, Rev. 0 (Draft), Addendum 5 , Safety Analysis for Rotary Mode Core Sampling. Responsibilities, task description, cost estimate, and schedule are presented

  1. Revision of the basic plans of the first nuclear-powered ship development

    International Nuclear Information System (INIS)

    1978-01-01

    Along with the law for Japan Nuclear Ship Development Agency, the basic plans of development of the first nuclear-powered ship have been revised. After explaining the basic policy concerning the matter, the development program is described as follows: ship type/kind, nuclear power plant, construction, training of ship crew, experimental voyage, compilation of the development results, and works after the experimental voyage. The first nuclear-powered ship of about 8,000 tons gross tonnage, 10,000 horsepower main engine output, and about 16 knots, sea speed will be the ship for special cargo transport and crew training. A pressurized water reactor is used for the power plant. Following the repair of shielding and the overall inspection of safety, the ship is to be completed as early as possible. After completion of the ship, its experimental voyage will be carried out, aiming at the aspects of operational familiarization, ship performance, reliability, port call experience, etc. (Mori, K

  2. 78 FR 37132 - Approval and Promulgation of Implementation Plans; Revised Format for Materials Being...

    Science.gov (United States)

    2013-06-20

    ... Promulgation of Implementation Plans; Revised Format for Materials Being Incorporated by Reference for Florida... the ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which... recodification and miscellaneous revisions to the Florida SIP. EPA also finds that there is good cause under APA...

  3. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  4. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  5. 75 FR 15391 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision to Control...

    Science.gov (United States)

    2010-03-29

    ... to control volatile organic compound (VOC) emissions from storage tanks, transport vessels and marine... Promulgation of Air Quality Implementation Plans; Texas; Revision to Control Volatile Organic Compound.... Specifically, this revision subjects owners or operators of VOC storage tanks, transport vessels, and marine...

  6. Development of Comprehensive Nuclear Safety Regulation Plan for 2007-2011

    International Nuclear Information System (INIS)

    Choi, Young Sung; Kim, Woong Sik; Park, Dong Keuk; Kim, Ho Ki

    2006-01-01

    The Article 8-2 of Atomic Energy Act requires the government to establish Atomic Energy Promotion Plan every five years. It sets out national nuclear energy policies in a systematic and consistent way. The plan presents the goals and basic directions of national nuclear energy policies on the basis of current status and prospects. Both areas of utilization and safety management of nuclear energy are included and various projects and schedules are delineated based on the national policy directions. The safety management area in this plan deals with the overall safety and regulation policy. Its detail projects and schedule should be developed in separate plans by responsible ministries under the mediation of the MOST. As a regulatory authority, MOST is responsible for safety management area and its technical support organization, KINS has developed Comprehensive Nuclear Safety Regulation Plan as an implementation plan of safety area. This paper presents the development process and specific projects contained in the Comprehensive Nuclear Safety Regulation Plan which is under development now

  7. A study on the revision of nuclear safety act to build the foundation of nuclear export and import control system in Korea

    International Nuclear Information System (INIS)

    Yang, Seung Hyo; Choi, Sun Do

    2012-01-01

    Nuclear related items require export and import control beyond the multilateral export control system according to Safeguard Agreement, Additional Protocol and bilateral agreements. Besides Korea as a nuclear supplier is needed to actively cope with its export control system, which is being reinforced internationally. In regard to this trend, this study drew the revision plan of present Nuclear Safety Act to found the nuclear export and import control system in Korea by examining the related legislations and analyzing the implementation status of nuclear export and import control

  8. A study on the revision of nuclear safety act to build the foundation of nuclear export and import control system in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Seung Hyo; Choi, Sun Do [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2012-10-15

    Nuclear related items require export and import control beyond the multilateral export control system according to Safeguard Agreement, Additional Protocol and bilateral agreements. Besides Korea as a nuclear supplier is needed to actively cope with its export control system, which is being reinforced internationally. In regard to this trend, this study drew the revision plan of present Nuclear Safety Act to found the nuclear export and import control system in Korea by examining the related legislations and analyzing the implementation status of nuclear export and import control.

  9. LANL Safety Conscious Work Environment (SCWE) Self-Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hargis, Barbara C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-01-29

    On December 21, 2012 Secretary of Energy Chu transmitted to the Defense Nuclear Facilities Safety Board (DNFSB) revised commitments on the implementation plan for Safety Culture at the Waste Treatment and Immobilization Plant. Action 2-5 was revised to require contractors and federal organizations to complete Safety Conscious Work Environment (SCWE) selfassessments and provide reports to the appropriate U.S. Department of Energy (DOE) - Headquarters Program Office by September 2013. Los Alamos National Laboratory (LANL) planned and conducted a Safety Conscious Work Environment (SCWE) Self-Assessment over the time period July through August, 2013 in accordance with the SCWE Self-Assessment Guidance provided by DOE. Significant field work was conducted over the 2-week period August 5-16, 2013. The purpose of the self-assessment was to evaluate whether programs and processes associated with a SCWE are in place and whether they are effective in supporting and promoting a SCWE.

  10. NRC drug-free workplace plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ``NRC Drug-Free Workplace Plan,`` supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance.

  11. NRC drug-free workplace plan. Revision 1

    International Nuclear Information System (INIS)

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ''NRC Drug-Free Workplace Plan,'' supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance

  12. 78 FR 61329 - Revision of the Land Management Plan for the Nantahala and Pisgah National Forests

    Science.gov (United States)

    2013-10-03

    .... Individuals who use telecommunication devices for the deaf (TDD) may call the Federal Information Relay.... More information on the planning process can also be found on the Nantahala and Pisgah Plan Revision... Forest Planning Rule (36 CFR Part 219), the planning process encompases three-stages: Assessment, plan...

  13. [Post-marketing drug safety-risk management plan(RMP)].

    Science.gov (United States)

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  14. Changes in safety climate and teamwork in the operating room after implementation of a revised WHO checklist: a prospective interventional study.

    Science.gov (United States)

    Erestam, Sofia; Haglind, Eva; Bock, David; Andersson, Annette Erichsen; Angenete, Eva

    2017-01-01

    Inter-professional teamwork in the operating room is important for patient safety. The World Health Organization (WHO) checklist was introduced to improve intraoperative teamwork. The aim of this study was to evaluate the safety climate in a Swedish operating room setting before and after an intervention, using a revised version of the WHO checklist to improve teamwork. This study is a single center prospective interventional study. Participants were personnel working in operating room teams including surgeons, anesthesiologists, scrub nurses, nurse anaesthetists and nurse assistants. The study started with pre-interventional observations of the WHO checklist use followed by education on safety climate, the WHO checklist, and non-technical skills in the operating room. Thereafter a revised version of the WHO checklist was introduced. Post-interventional observations regarding the performance of the WHO checklist were carried out. The Safety Attitude Questionnaire was used to assess safety climate at baseline and post-intervention. At baseline we discovered a need for improved teamwork and communication. The participants considered teamwork to be important for patient safety, but had different perceptions of good teamwork between professions. The intervention, a revised version of the WHO checklist, did not affect teamwork climate. Adherence to the revision of the checklist was insufficient, dominated by a lack of structure. There was no significant change in teamwork climate by use of the revised WHO checklist, which may be due to insufficient implementation, as a lack of adherence to the WHO checklist was detected. We found deficiencies in teamwork and communication. Further studies exploring how to improve safety climate are needed. NCT02329691.

  15. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0987; FRL-9617-5] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  16. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0394; FRL-9845-4] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  17. OCRWM [Office of Civilian Radioactive Waste Management] Safety Plan

    International Nuclear Information System (INIS)

    1986-12-01

    The OCRWM Safety Plan sets forth management policies and general requirements for the safety of the public and of personnel associated with the Civilian Radioactive Waste Management Program (hereinafter called the ''Program''). It is applicable to all individuals and organizational elements of the Program, including all facilities and activities controlled by the Program pursuant to the Act, and to all phases of the Program. The plan defines the responsibilities assigned by the Director of the OCRWM to the various OCRWM line organizations, and to the contractors and the projects. It discusses the means by which safety policies and requirements will be communicated, and summarizes the applicable DOE Orders, and the procedures for reviewing, reporting, and evaluating safety problems. In addition, the OCRWM Safety Plan addresses DOE Orders applicable to occupational health and safety, worker protection, and public health and safety. OCRWM believes that it has an equally high level of commitment to both public safety and worker safety. The Plan also summarizes applicable NRC criteria and regulations that will be imposed through the formal licensing proceedings. While the Safety Plan sets forth OCRWM policy, it is not intended to be prescriptive in the details of implementation. Each OCRWM program element must develop and control its own set of detailed requirements for the protection of its workers and the public based on the principles set forth herein

  18. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  19. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  20. 75 FR 2846 - Plan Revision for Prescott National Forest, Yavapai and Coconino Counties, AZ

    Science.gov (United States)

    2010-01-19

    .... Finally, this notice briefly describes the applicable planning rule and how work done on the plan revision... addressed project specific needs and the balance addressed programmatic needs. Programmatic needs for... guidelines; Suitability of lands for timber production, grazing, and recreation opportunities; Monitoring and...

  1. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  2. 77 FR 37359 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-06-21

    ...EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) and the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  3. 78 FR 922 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-01-07

    ...EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California Implementation Plan (SIP). These revisions concern local rules that regulate inhalable particulate matter (PM10) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and agricultural areas in Imperial County. We are proposing to approve local rules that regulate these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  4. 75 FR 13468 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-03-22

    ...EPA is proposing to disapprove a revision to the Monterey Bay Unified Air Pollution Control District (MBAPCD) portion of the California State Implementation Plan (SIP). This revision concerns opacity standards related to multiple pollutants, including particulate matter (PM) emissions from several different types of sources, ranging from fugitive dust to gas turbine generators. We are proposing action on a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  5. 77 FR 35327 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from the manufacture of polystyrene, polyethylene, and polypropylene products. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  6. Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3

    International Nuclear Information System (INIS)

    Meichle, R.H.

    1994-01-01

    This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications

  7. Revised IAEA Code of Conduct on the Safety and Security of Radioactive Sources

    International Nuclear Information System (INIS)

    Wheatley, J. S.

    2004-01-01

    The revised Code of Conduct on the Safety and Security of Radioactive Sources is aimed primarily at Governments, with the objective of achieving and maintaining a high level of safety and security of radioactive sources through the development, harmonization and enforcement of national policies, laws and regulations; and through the fostering of international co-operation. It focuses on sealed radioactive sources and provides guidance on legislation, regulations and the regulatory body, and import/export controls. Nuclear materials (except for sources containing 239Pu), as defined in the Convention on the Physical Protection of Nuclear Materials, are not covered by the revised Code, nor are radioactive sources within military or defence programmes. An earlier version of the Code was published by IAEA in 2001. At that time, agreement was not reached on a number of issues, notably those relating to the creation of comprehensive national registries for radioactive sources, obligations of States exporting radioactive sources, and the possibility of unilateral declarations of support. The need to further consider these and other issues was highlighted by the events of 11th September 2001. Since then, the IAEA's Secretariat has been working closely with Member States and relevant International Organizations to achieve consensus. The text of the revised Code was finalized at a meeting of technical and legal experts in August 2003, and it was submitted to IAEA's Board of Governors for approval in September 2003, with a recommendation that the IAEA General Conference adopt it and encourage its wide implementation. The IAEA General Conference, in September 2003, endorsed the revised Code and urged States to work towards following the guidance contained within it. This paper summarizes the history behind the revised Code, its content and the outcome of the discussions within the IAEA Board of Governors and General Conference. (Author) 8 refs

  8. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  9. Vault Safety and Inventory System users manual, PRIME 2350. Revision 1

    International Nuclear Information System (INIS)

    Downey, N.J.

    1994-01-01

    This revision is issued to request review of the attached document: VSIS User Manual, PRIME 2350, which provides user information for the operation of the VSIS (Vault Safety and Inventory System). It describes operational aspects of Prime 2350 minicomputer and vault data acquisition equipment. It also describes the User's Main Menu and menu functions, including REPORTS. Also, system procedures for the Prime 2350 minicomputer are covered

  10. Vault Safety and Inventory System users manual, PRIME 2350. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Downey, N.J.

    1994-12-14

    This revision is issued to request review of the attached document: VSIS User Manual, PRIME 2350, which provides user information for the operation of the VSIS (Vault Safety and Inventory System). It describes operational aspects of Prime 2350 minicomputer and vault data acquisition equipment. It also describes the User`s Main Menu and menu functions, including REPORTS. Also, system procedures for the Prime 2350 minicomputer are covered.

  11. Overview of the Nuclear Regulatory Commission's safety research program

    International Nuclear Information System (INIS)

    Beckjord, E.S.

    1989-01-01

    Accomplishments during 1988 of the Office of Nuclear Regulatory Research and the program of safety research are highlighted, and plans, expections, and needs of the next year and beyond are discussed. Topics discussed include: ECCS Appendix K Revision; pressurized thermal shock; NUREG-1150, or the PRA method performance document; resolution of station blackout; severe accident integration plan; nuclear safety research review committee; and program management

  12. Assessment of CFD Codes for Nuclear Reactor Safety Problems - Revision 2

    International Nuclear Information System (INIS)

    Smith, B.L.; Andreani, M.; Bieder, U.; Ducros, F.; Bestion, D.; Graffard, E.; Heitsch, M.; Scheuerer, M.; Henriksson, M.; Hoehne, T.; Houkema, M.; Komen, E.; Mahaffy, J.; Menter, F.; Moretti, F.; Morii, T.; Muehlbauer, P.; Rohde, U.; Krepper, E.; Song, C.H.; Watanabe, T.; Zigh, G.; Boyd, C.F.; Archambeau, F.; Bellet, S.; Munoz-Cobo, J.M.; Simoneau, J.P.

    2015-01-01

    Following recommendations made at an 'Exploratory Meeting of Experts to Define an Action Plan on the Application of Computational Fluid Dynamics (CFD) Codes to Nuclear Reactor Safety (NRS) Problems', held in Aix-en-Provence, France, 15-16 May, 2002, and a follow-up meeting 'Use of Computational Fluid Dynamics (CFD) Codes for Safety Analysis of Reactor Systems including Containment', which took place in Pisa on 11-14 Nov., 2002, a CSNI action plan was drawn up which resulted in the creation of three Writing Groups, with mandates to perform the following tasks: (1) Provide a set of guidelines for the application of CFD to NRS problems; (2) Evaluate the existing CFD assessment bases, and identify gaps that need to be filled; (3) Summarise the extensions needed to CFD codes for application to two-phase NRS problems. Work began early in 2003. In the case of Writing Group 2 (WG2), a preliminary report was submitted to Working Group on the Analysis and Management of Accidents (WGAMA) in September 2004 that scoped the work needed to be carried out to fulfil its mandate, and made recommendations on how to achieve the objective. A similar procedure was followed by the other two groups, and in January 2005 all three groups were reformed to carry out their respective tasks. In the case of WG2, this resulted in the issue of a CSNI report (NEA/CSNI/R(2007)13), issued in January 2008, describing the work undertaken. The writing group met on average twice per year during the period March 2005 to May 2007, and coordinated activities strongly with the sister groups WG1 (Best Practice Guidelines) and WG3 (Multiphase Extensions). The resulting document prepared at the end of this time still represents the core of the present revised version, though updates have been made as new material has become available. After some introductory remarks, Chapter 3 lists twenty-three (23) NRS issues for which it is considered that the application of CFD would bring real benefits

  13. 77 FR 24883 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-26

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern oxides of nitrogen (NOX) from solid fuel fired boilers, steam generators and process heaters. We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  14. 77 FR 35329 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from crude oil production sumps and refinery wastewater separators. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  15. Research on the Evaluation System for Rural Public Safety Planning

    Institute of Scientific and Technical Information of China (English)

    Ming; SUN; Jianxin; YAN

    2014-01-01

    The indicator evaluation system is introduced to the study of rural public safety planning in this article.By researching the current rural public safety planning and environmental carrying capacity,we select some carrying capacity indicators influencing the rural public safety,such as land,population,ecological environment,water resources,infrastructure,economy and society,to establish the environmental carrying capacity indicator system.We standardize the indicators,use gray correlation analysis method to determine the weight of indicators,and make DEA evaluation of the indicator system,to obtain the evaluation results as the basis for decision making in rural safety planning,and provide scientific and quantified technical support for rural public safety planning.

  16. Software quality assurance plans for safety-critical software

    International Nuclear Information System (INIS)

    Liddle, P.

    2006-01-01

    Application software is defined as safety-critical if a fault in the software could prevent the system components from performing their nuclear-safety functions. Therefore, for nuclear-safety systems, the AREVA TELEPERM R XS (TXS) system is classified 1E, as defined in the Inst. of Electrical and Electronics Engineers (IEEE) Std 603-1998. The application software is classified as Software Integrity Level (SIL)-4, as defined in IEEE Std 7-4.3.2-2003. The AREVA NP Inc. Software Program Manual (SPM) describes the measures taken to ensure that the TELEPERM XS application software attains a level of quality commensurate with its importance to safety. The manual also describes how TELEPERM XS correctly performs the required safety functions and conforms to established technical and documentation requirements, conventions, rules, and standards. The program manual covers the requirements definition, detailed design, integration, and test phases for the TELEPERM XS application software, and supporting software created by AREVA NP Inc. The SPM is required for all safety-related TELEPERM XS system applications. The program comprises several basic plans and practices: 1. A Software Quality-Assurance Plan (SQAP) that describes the processes necessary to ensure that the software attains a level of quality commensurate with its importance to safety function. 2. A Software Safety Plan (SSP) that identifies the process to reasonably ensure that safety-critical software performs as intended during all abnormal conditions and events, and does not introduce any new hazards that could jeopardize the health and safety of the public. 3. A Software Verification and Validation (V and V) Plan that describes the method of ensuring the software is in accordance with the requirements. 4. A Software Configuration Management Plan (SCMP) that describes the method of maintaining the software in an identifiable state at all times. 5. A Software Operations and Maintenance Plan (SO and MP) that

  17. 78 FR 63929 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and...

    Science.gov (United States)

    2013-10-25

    ... requirements for grandfathered facilities. The revisions will contribute to improvement in overall air quality... to contribute to improvement of air quality and attainment or maintenance of the federal air quality...] Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and Regulations...

  18. 12 CFR 702.306 - Revised business plans for new credit unions.

    Science.gov (United States)

    2010-01-01

    ... exposure to risk (including credit risk, interest-rate risk, and other types of risk). (d) Consideration of... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Revised business plans for new credit unions. 702.306 Section 702.306 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING...

  19. 78 FR 47014 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Science.gov (United States)

    2013-08-02

    .... ML12354A524. 3. Revision 1 of RG 1.170, ``Test Documentation for Digital Computer Software used in Safety... is in ADAMS at Accession No. ML12354A531. 4. Revision 1 of RG 1.171, ``Software Unit Testing for... Software Used in Safety Systems of Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION...

  20. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  1. Guidelines for the Review of Research Reactor Safety: Revised Edition. Reference Document for IAEA Integrated Safety Assessment of Research Reactors (INSARR)

    International Nuclear Information System (INIS)

    2013-01-01

    The Integrated Safety Assessment of Research Reactors (INSARR) is an IAEA safety review service available to Member States with the objective of supporting them in ensuring and enhancing the safety of their research reactors. This service consists of performing a comprehensive peer review and an assessment of the safety of the respective research reactor. The reviews are based on IAEA safety standards and on the provisions of the Code of Conduct on the Safety of Research Reactors. The INSARR can benefit both the operating organizations and the regulatory bodies of the requesting Member States, and can include new research reactors under design or operating research reactors, including those which are under a Project and Supply Agreement with the IAEA. The first IAEA safety evaluation of a research reactor operated by a Member State was completed in October 1959 and involved the Swiss 20 MW DIORIT research reactor. Since then, and in accordance with its programme on research reactor safety, the IAEA has conducted safety review missions in its Member States to enhance the safety of their research reactor facilities through the application of the Code of Conduct on the Safety of Research Reactors and the relevant IAEA safety standards. About 320 missions in 51 Member States were undertaken between 1972 and 2012. The INSARR missions and other limited scope safety review missions are conducted following the guidelines presented in this publication, which is a revision of Guidelines for the Review of Research Reactor Safety (IAEA Services Series No. 1), published in December 1997. This publication details those IAEA safety standards and guidance publications relevant to the safety of research reactors that have been revised or published since 1997. The purpose of this publication is to give guidance on the preparation, implementation, reporting and follow-up of safety review missions. It is also intended to be of assistance to operators and regulators in conducting

  2. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  3. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  4. High-Level Waste Systems Plan. Revision 7 (U)

    International Nuclear Information System (INIS)

    Brooke, J.N.; Gregory, M.V.; Paul, P.; Taylor, G.; Wise, F.E.; Davis, N.R.; Wells, M.N.

    1996-10-01

    This revision of the High-Level Waste (HLW) System Plan aligns SRS HLW program planning with the DOE Savannah River (DOE-SR) Ten Year Plan (QC-96-0005, Draft 8/6), which was issued in July 1996. The objective of the Ten Year Plan is to complete cleanup at most nuclear sites within the next ten years. The two key principles of the Ten Year Plan are to accelerate the reduction of the most urgent risks to human health and the environment and to reduce mortgage costs. Accordingly, this System Plan describes the HLW program that will remove HLW from all 24 old-style tanks, and close 20 of those tanks, by 2006 with vitrification of all HLW by 2018. To achieve these goals, the DWPF canister production rate is projected to climb to 300 canisters per year starting in FY06, and remain at that rate through the end of the program in FY18, (Compare that to past System Plans, in which DWPF production peaked at 200 canisters per year, and the program did not complete until 2026.) An additional $247M (FY98 dollars) must be made available as requested over the ten year planning period, including a one-time $10M to enhance Late Wash attainment. If appropriate resources are made available, facility attainment issues are resolved and regulatory support is sufficient, then completion of the HLW program in 2018 would achieve a $3.3 billion cost savings to DOE, versus the cost of completing the program in 2026. Facility status information is current as of October 31, 1996

  5. A revised 3-column classification approach for the surgical planning of extended lateral tibial plateau fractures.

    Science.gov (United States)

    Hoekstra, H; Kempenaers, K; Nijs, S

    2017-10-01

    Variable angle locking compression plates allow for lateral buttress and support of the posterolateral joint surface of tibial plateau fractures. This gives room for improvement of the surgical 3-column classification approach. Our aim was to revise and validate the 3-column classification approach to better guide the surgical planning of tibial plateau fractures extending into the posterolateral corner. In contrast to the 3-column classification approach, in the revised approach the posterior border of the lateral column in the revised approach lies posterior instead of anterior of the fibula. According to the revised 3-column classification approach, extended lateral column fractures are defined as single lateral column fractures extending posteriorly into the posterolateral corner. CT-images of 36 patients were reviewed and classified twice online according to Schatzker and revised 3-column classification approach by five observers. The intraobserver reliability was calculated using the Cohen's kappa and the interobserver reliability was calculated using the Fleiss' kappa. The intraobserver reliability showed substantial agreement according to Landis and Koch for both Schatzker and the revised 3-column classification approach (0.746 vs. 0.782 p = 0.37, Schatzker vs. revised 3-column, respectively). However, the interobserver reliability of the revised 3-column classification approach was significantly higher as compared to the Schatzker classification (0.531 vs. 0.669 p column, respectively). With the introduction of variable angle locking compression plates, the revised 3-column classification approach is a very helpful tool in the preoperative surgical planning of tibial plateau fractures, in particular, lateral column fractures that extend into the posterolateral corner. The revised 3-column classification approach is rather a practical supplement to the Schatzker classification. It has a significantly higher interobserver reliability as compared to the

  6. 77 FR 66429 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-05

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compounds (VOC), carbon monoxide (CO), oxides of nitrogen (NOX), oxides of sulfur (SOX), and particulate matter (PM) emissions from glass melting furnaces. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  7. Safety and health five-year plan, Fiscal years 1995--1999

    International Nuclear Information System (INIS)

    1994-10-01

    This report describes efforts by the Department of Energy (DOE) to size and allocate funding to safety and health activities that protect workers and the public from harm. Although it is well recognized that virtually every aspect of an operation has health and safety implications, this effort is directed at identifying planned efforts specifically directed at health and safety. The initial effort, to compile information for the period covering FY 1994--1998, served two primary needs: (1) to document what was actually taking place in the DOE Complex, from a budget and resource utilization standpoint (how the complex was reacting to the calls for greater protection for workers and the public); and (2) to embark on an effort to utilize forward-looking management plans to allocate resources to meet safety and health needs (to begin to be proactive). It was recognized that it would take several years to achieve full acceptance and implementation of a single, DOE-wide approach toward planning for safety and health, and to develop plans that emphasized the benefits from both risk management and accident prevention strategies. This report, describing safety and health plans and budgets for FY 1995, reflects the increasing acceptance of risk-based strategies in the development of safety and health plans. More operations are using the prioritization methodology recommended for the safety and health planning process, and more operations have begun to review planned expenditures of resources to better assure that resources are allocated to the highest risk reduction activities

  8. 75 FR 37727 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-06-30

    ...EPA is finalizing disapproval of a revision to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on March 22, 2010. This revision concerns opacity standards related to multiple pollutants, including particulate matter (PM) emissions, from a wide variety of sources. Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), this action identifies a deficiency that precludes approval of this SIP revision.

  9. 78 FR 16612 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2013-03-18

    ... Hazardous Substances Pollution Contingency Plan (NCP) to broaden the technology, to include computer... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-2012-0738; FRL-9791-4] National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public Availability of the...

  10. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  11. Health and safety plan for operations performed for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  12. 75 FR 27647 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Emission...

    Science.gov (United States)

    2010-05-18

    ... severable portions of two revisions to the Texas State Implementation Plan (SIP) submitted by the State of... further clarify procedures for using emission protocols and to update the approved list of emission credit... to recently recodified 30 TAC Chapter 117 provisions. EPA has determined that these SIP revisions...

  13. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  14. 75 FR 36126 - Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on...

    Science.gov (United States)

    2010-06-24

    ... Standard Review Plan Section 13.6.1, Revision 1 on Physical Security--Combined License and Operating...), Section 13.6.1 on ``Physical Security--Combined License and Operating Reactors,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100350158). The Office of Nuclear Security and...

  15. Safety basis for selected activities in single-shell tanks with flammable gas concerns. Revision 1

    International Nuclear Information System (INIS)

    Schlosser, R.L.

    1996-01-01

    This is full revision to Revision 0 of this report. The purpose of this report is to provide a summary of analyses done to support activities performed for single-shell tanks. These activities are encompassed by the flammable gas Unreviewed Safety Question (USQ). The basic controls required to perform these activities involve the identification, elimination and/or control of ignition sources and monitoring for flammable gases. Controls are implemented through the Interim Safety Basis (ISB), IOSRs, and OSDs. Since this report only provides a historical compendium of issues and activities, it is not to be used as a basis to perform USQ screenings and evaluations. Furthermore, these analyses and others in process will be used as the basis for developing the Flammable Gas Topical Report for the ISB Upgrade

  16. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  17. Looking Back to Move Forward: Collaborative Planning to Revise the Green Mountain and Finger Lakes National Forests Land and Resource Management Plans

    Directory of Open Access Journals (Sweden)

    Michael J Dockry

    2015-07-01

    Full Text Available The United States Department of Agriculture Forest Service (Forest Service manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting to incorporate innovative, collaborative public involvement strategies into the process for revising forest plans. In 2012 and 2015 the Forest Service codified new regulations for developing, revising, and amending forest plans. Collaboration and public involvement are explicit goals of the new regulations. This paper briefly reviews the literature on collaborative planning on national forests and explores a successful collaborative planning process used by the Green Mountain and Finger Lakes National Forests, located in Vermont and New York respectively, to develop their 2006 forest plans. This paper shows how the Green Mountain and Finger Lakes National Forests developed parallel public and internal collaborative processes to build trust, relationships, and partnership, and discusses the implications for process design, capacity building, and facilitating agreements. By looking back at this successful case of collaborative forest planning, key lessons can provide ideas for developing collaborative processes for future planning efforts.

  18. Environmental, Safety, and Health Plan for the remedial investigation/feasibility study at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Revision 1, Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Davis, C. M.; El-Messidi, O. E.; Cowser, D. K.; Kannard, J. R.; Carvin, R. T.; Will, III, A. S.; Clark, Jr., C.; Garland, S. B.

    1993-05-01

    This Environmental, Safety, and Health (ES&H) Plan presents the concepts and methodologies to be followed during the remedial investigation/feasibility study (RI/FS) for Oak Ridge National Laboratory (ORNL) to protect the health and safety of employees, the public, and the environment. This ES&H Plan acts as a management extension for ORNL and Martin Marietta Energy Systems, Inc. (Energy Systems) to direct and control implementation of the project ES&H program. The subsections that follow describe the program philosophy, requirements, quality assurance measures, and methods for applying the ES&H program to individual waste area grouping (WAG) remedial investigations. Hazardous work permits (HWPs) will be used to provide task-specific health and safety requirements.

  19. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  20. 76 FR 41705 - Approval and Promulgation of Implementation Plans; New York; Revised Format of Materials Being...

    Science.gov (United States)

    2011-07-15

    ...-year period, EPA will review its experience with the new table format and will decide whether or not to... the APA, since the reorganization and codification of the revised format for denoting IBR of the state... Promulgation of Implementation Plans; New York; Revised Format of Materials Being Incorporated by Reference...

  1. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  2. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  3. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  4. Sensitivity Studies on Revised PSA Model of KHNP Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Hyun-Gyo; Hwang, Seok-Won; Shin, Tae-Young

    2016-01-01

    Korea also performed safety revaluation for all nuclear power plants led by Korean regulatory and elicited 49 improvement factor for plants. One of those factors is Severe Accident Management Guidelines (SAMG) development, KHNP decided to develop Low Power and Shutdown(LPSD) Probabilistic Safety Assessment (PSA) models and upgrade full power PSA models of all operating plants for enhancement of guideline quality. In this paper we discuss about the effectiveness of post Fukushima equipment and improvements of each plant based on the results of revised full power PSA and newly developed LPSD PSA. Through sensitivity analysis based on revised PSA models we confirmed that the facilities installed or planned to installation as follow-up measures of Fukushima accident helped to enhance the safety of nuclear power plants. These results will provide various technical insights to scheduled studies which evaluate effectiveness of Fukushima post action items and develop accident management guideline. Also it will contribute to improve nuclear power plants safety

  5. Sensitivity Studies on Revised PSA Model of KHNP Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyun-Gyo; Hwang, Seok-Won; Shin, Tae-Young [KHNP, Daejeon (Korea, Republic of)

    2016-10-15

    Korea also performed safety revaluation for all nuclear power plants led by Korean regulatory and elicited 49 improvement factor for plants. One of those factors is Severe Accident Management Guidelines (SAMG) development, KHNP decided to develop Low Power and Shutdown(LPSD) Probabilistic Safety Assessment (PSA) models and upgrade full power PSA models of all operating plants for enhancement of guideline quality. In this paper we discuss about the effectiveness of post Fukushima equipment and improvements of each plant based on the results of revised full power PSA and newly developed LPSD PSA. Through sensitivity analysis based on revised PSA models we confirmed that the facilities installed or planned to installation as follow-up measures of Fukushima accident helped to enhance the safety of nuclear power plants. These results will provide various technical insights to scheduled studies which evaluate effectiveness of Fukushima post action items and develop accident management guideline. Also it will contribute to improve nuclear power plants safety.

  6. Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1

    International Nuclear Information System (INIS)

    Prather, M.C.

    1994-11-01

    This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn't bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem

  7. 49 CFR 1106.4 - The Safety Integration Plan process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4 Section 1106.4 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS...

  8. Russian Minatom nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  9. Role of nuclear safety research and future plan

    International Nuclear Information System (INIS)

    Kim, W. S.; Lee, J. I.; Kang, S. C.; Park, Y. W.; Lee, J. H.; Kim, M. W.; Lee, C. J.; Park, Y. I.

    2000-01-01

    For promoting and improving nuclear safety research activities, this report gives an insight on the scope of safety research and its role in the safety management of nuclear installations, and suggests measures to adequately utilize the research results through taking an optimized role share among research organizations. Several measures such as cooperative planning of common research areas and proper role assignment, improvement of the interfaces among researchers, and reflection of end-users' opinion in the course of planning and conducting research to promote application of research results are identified. It is expected that the identified measures will contribute to enhancing the efficiency and effectiveness of nuclear safety research, if they are implemented after deliberating with the government and safety research organizations

  10. 12 CFR 308.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... time within which those steps will be taken. (c) Review of safety and soundness compliance plans... PRACTICE RULES OF PRACTICE AND PROCEDURE Submission and Review of Safety and Soundness Compliance Plans and... compliance plan. (a) Schedule for filing compliance plan—(1) In general. A bank shall file a written safety...

  11. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District...

  12. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  13. 78 FR 37176 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Science.gov (United States)

    2013-06-20

    ...EPA is proposing to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of the California State Implementation Plan (SIP). This revision concerns volatile organic compound (VOC) emissions from architectural coatings. We are proposing to approve a local rule to regulate these emission sources under the Clean Air Act (CAA or the Act).

  14. 78 FR 37130 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Science.gov (United States)

    2013-06-20

    ...EPA is taking direct final action to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of the California State Implementation Plan (SIP). This revision concerns volatile organic compound (VOC) emissions from architectural coatings. We are approving a local rule that regulates this emission source under the Clean Air Act (CAA or the Act).

  15. 75 FR 56942 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Science.gov (United States)

    2010-09-17

    ...EPA is proposing to approve revisions to the San Diego Air Pollution Control District (SDCAPCD) portion of the California State Implementation Plan (SIP). This revision concerns the definition of volatile organic compounds (VOC). We are proposing to approve a local rule to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  16. Categorization of radioactive sources. Revision of IAEA-TECDOC-1191, Categorization of radiation sources

    International Nuclear Information System (INIS)

    2003-07-01

    the Safety of Radiation Sources and the Security of Radioactive Materials (the Action Plan) in Attachment 2 to publication GOV/1999/46-GC(43)/10. In September 1999, the Board approved the Action Plan and requested the Secretariat to implement it. The subsequent General Conference endorsed the Board's decision and urged the Secretariat to implement the Action Plan. The Action Plan covered seven major work areas, one of which identified the need for a system of source categorization. The resulting IAEA-TECDOC-1191 Categorization of Radiation Sources, was published in December 2000. Whilst IAEA-TECDOC-1191 provided a useful system for categorizing radioactive sources, according to radiological and other risks, it was limited in its scope of application. Under the auspices of the Action Plan, the IAEA also organized an International Conference of National Regulatory Authorities with Competence in the Safety of Radiation Sources and the Security of Radioactive Material, which was held in Buenos Aires, Argentina, from 11 to 15 December 2000 (the Buenos Aires Conference). At its meetings in March 2001 the Board considered the report on the major findings of the Buenos Aires Conference (GOV/2001/3, 12 February 2001). It noted these major findings and requested the Secretariat to assess the implications of the major findings of the Buenos Aires Conference for the Action Plan for the Safety of Radiation Sources and the Security of Radioactive Materials, and to implement any adjustments to the Action Plan that may be necessary. The subsequent revised Action Plan on the Safety and Security of Radiation Sources (GOV/2001/29-GC(45)/12) noted the need to review how the categorization system was being used, and to consider revising it. The Secretariat also recognized that the new categorization system was crucial to other high priority work initiatives being carried out by IAEA, such as the revised Code of Conduct on the Safety and Security of Radioactive Sources (in preparation) and

  17. Revision of construction plan for advanced thermal demonstration reactor

    International Nuclear Information System (INIS)

    1996-01-01

    The Federation of Electric Power Companies demanded the revision of the construction plan for the advanced thermal demonstration reactor, which is included in the 'Long term plan on the research, development and utilization of atomic energy' decided by the Atomic Energy Commission in 1994, for economical reason. The Atomic Energy Commission carried out the deliberation on this demand. It was found that the cost of construction increases to 580 billion yen, and the cost of electric power generation increases three times as high as that of LWRs. The role as the reactor that utilizes MOX fuel can be substituted by LWRs. The relation of trust with the local town must be considered. In view of these circumstances, it is judged that the stoppage of the construction plan is appropriate. It is necessary to investigate the substitute plan for the stoppage, and the viewpoints of investigating the substitute plan, the examination of the advanced BWR with all MOX fuel core and the method of advancing its construction are considered. On the research and development related to advanced thermal reactors, the research and development contributing to the advance of nuclear fuel recycling are advanced, and the prototype reactor 'Fugen' is utilized. (K.I.)

  18. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  19. Certification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Toffer, H.; Crowe, R.D.; Ades, M.J.

    1990-05-01

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA ampersand PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan's objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations

  20. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2011-12-06

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of..., Regulatory Planning and Review The Office of Management and Budget (OMB) has exempted this regulatory action...

  1. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) and oxides of sulfur source categories. We are proposing to approve these negative declarations under the Clean Air Act as amended in 1990 (CAA or the Act).

  2. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  3. Savannah River Site mixed waste Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and reference document: Revision 2

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1995-01-01

    The DOE is required by the Resource Conservation and Recovery Act to prepare site treatment plans describing the development of treatment capacities and technologies for treating mixed waste. This proposed plan contains Savannah River Site's preferred options and schedules for constructing new facilities, and otherwise obtaining treatment for mixed wastes. The proposed plan consists of 2 volumes. Volume 1, Compliance Plan, identifies the capacity to be developed and the schedules as required. Volume 2, Background, provides a detailed discussion of the preferred options with technical basis, plus a description of the specific waste streams. Chapters are: Introduction; Methodology; Mixed low level waste streams; Mixed transuranic waste; High level waste; Future generation of mixed waste streams; Storage; Process for evaluation of disposal issues in support of the site treatment plans discussions; Treatment facilities and treatment technologies; Offsite waste streams for which SRS treatment is the Preferred Option (Naval reactor wastes); Summary information; and Acronyms and glossary. This revision does not contain the complete revised report, but only those pages that have been revised

  4. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  5. Sanitation health risk and safety planning in urban residential ...

    African Journals Online (AJOL)

    The aim of this review paper was to determine the best sanitation health risk and safety planning approach for sustainable management of urban environment. This was achieved by reviewing the concept of sanitation safety planning as a tool. The review adopted exploratory research approach and used secondary data ...

  6. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  7. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  8. 75 FR 57055 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog

    Science.gov (United States)

    2010-09-17

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog AGENCY: Fish... recovery plan for the Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened... and peer reviewers in an appendix to the approved recovery plan. The Utah prairie dog (Cynomys...

  9. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  10. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  11. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  12. 76 FR 17347 - Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control...

    Science.gov (United States)

    2011-03-29

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control District CFR Correction In Title 40 of the Code of Federal Regulations, Part 52 (Sec. Sec. 52.01 to 52.1018), revised as of July 1, 2010, on page 252, in Sec. 52.220, paragraph (c)(345)(i)(D) is added to...

  13. 75 FR 56889 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Science.gov (United States)

    2010-09-17

    ...EPA is taking direct final action to approve revisions to the San Diego County Air Pollution Control District (SDCAPCD) portion of the California State Implementation Plan (SIP). This revision concerns the definition of volatile organic compound (VOC). We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  14. 78 FR 6784 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-01-31

    ...EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC), oxides of nitrogen (NOX), and particulate matter (PM) emissions from open burning. We are proposing to approve local rules to regulate this emission source under the Clean Air Act (CAA or the Act).

  15. Compatibility grab sampling and analysis plan for fiscal year 1999

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. Analytical requirements are taken from two revisions of the Compatibility data quality objectives (DQOs). Revision 1 of the DQO (Fowler 1995) listed analyses to be performed to meet both safety and operational data needs for the Compatibility program. Revision 2A of the DQO (Mulkey and Miller 1998) addresses only the safety-related requirements; the operational requirements of Fowler (1995) have not been superseded by Mulkey and Miller (1998). Therefore, safety-related data needs are taken from Mulkey and Miller (1998) and operational-related data needs are taken from Fowler (1995). Ammonia and total alpha analyses are also performed in accordance with Fowler (1998a, 1998b)

  16. 76 FR 39357 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ...EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District (KCAPCD), and Ventura County Air Pollution Control District (VCAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from architectural coating operations. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  17. 76 FR 30080 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-24

    ...EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from surface coatings of metal parts and products. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  18. 76 FR 26224 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Science.gov (United States)

    2011-05-06

    ...EPA is proposing to approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts are required under Part C of title I of the Clean Air Act (CAA) to adopt and implement SIP- approved Prevention of Significant Deterioration (PSD) permit programs. These proposed revisions update the definitions used in the districts' PSD permit programs.

  19. 76 FR 30025 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-24

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from surface coating of metal parts and products. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  20. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  1. Addendum to the health and safety plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Wilson, K.A.

    1995-08-01

    There are three purposes for this addendum to the health and safety plan for Waste Area Grouping 6. The first purpose is to provide record of a corrective action response concerning an occurrence on WAG 6 in October 1994 (ORO-MMES-ENVRES-1994-0016.) This occurrence involved a precautionary evacuation of subcontractor field crews due to malfunctioning monitor alarms for organic vapors. The corrective action is to revise the WAG 6 Site health and safety plan to improve communications during emergency events. The second purpose is to incorporate any outstanding health and safety issues not addressed in the original health and safety plan for WAG 6 document (ORNL/ER-183). The only variance of note is tritium air monitoring in the Tumulus building. The tritium air monitor is added in this addendum as monitoring equipment for WAG 6 with description of action level and calibration. The third purpose of this addendum is to satisfy a condition of approval for the pending Nuclear Criticality Safety Assessment (NCSA) pertaining to KEMA fuel storage at WAG 6. This approval condition requires the following: ''The location of the KEMA burial shall be recorded and maintained in a controlled document that identifies the quantity and the general physical conditions at the time of the entombment with an admonishment to obtain nuclear criticality safety guidance before altering the burial condition.'' In order to satisfy the approval, this document must be controlled. The predecessor to the pending NCSA is NSR No. 0002WM22001

  2. 78 FR 51754 - Request To Modify License by Replacing Security Plan With New Radiation Safety Plan; U.S...

    Science.gov (United States)

    2013-08-21

    ... Replacing Security Plan With New Radiation Safety Plan; U.S. Department of the Army, Jefferson Proving... security plan with a new radiation safety plan. DATES: Submit comments by September 20, 2013. Requests for.... The proposed change is to modify License Condition No. 12 D which refers to the security plan of...

  3. Safety research plan, JFY 2013 edition

    International Nuclear Information System (INIS)

    2013-09-01

    As for the regulatory issues the governments or JNES considered necessary, JNES had updated every year 'safety research plan' in respective research areas necessary for solving the regulatory issues (safety research needs) and was conducting safety research to obtain the results, etc. 'Safety research plan, JFY 2013 Edition' was compiled aiming at promotion of appropriate reflection and flexible application of research achievements for tacking the regulatory issues taking account of importance and urgency dependent on trend of nuclear safety regulations as well as collective management of safety research and safety survey. 5 new research projects were established with 4 unified research projects and 6 terminated research projects. Finally modified safety research areas, subjects and research projects, JFY 2013 Edition were as follows: design review of nuclear power plant (7 subjects and each subject having several research projects totaled 19), control management of nuclear power plant (one subject having 4 research projects), nuclear fuel cycle (2 subjects and each subject having several research projects totaled 4), nuclear fuel cycle backend (2 subjects and each subject having several research projects totaled 5), nuclear emergency preparedness and response (3 subjects and each subject having several research projects totaled 7) and bases of nuclear safety technology (3 subjects and each subject having several research projects totaled 6). Safety reviews consisted of 6 projects in 3 areas extracting the regulatory issues. As for urgent research projects on the basis of the disaster at Fukushima Daiichi NPP accident, 7 research projects in 4 urgent subjects were as follows: examination for new safety regulation (4 research projects generalized in the above research projects), development of newly necessary evaluation methods (one research project generalized in the above research project), evaluation of the validity for the work for convergence at Fukushima

  4. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  5. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  6. Use of risk assessment panels during revision of the Tongass Land and Resource Management Plan.

    Science.gov (United States)

    Charles G. Shaw

    1999-01-01

    This paper describes the process used to conduct the 16 risk assessment panels and a subsistence working group held during revision of the Tongass land management plan. It provides an overview of how results from the panels were used by forest managers in plan-related decisionmaking, discusses some reactions to the effort, and identifies some opportunities to improve...

  7. Seismic safety margin research program. Program plan, Revision II

    International Nuclear Information System (INIS)

    Smith, P.D.; Tokarz, F.J.; Bernreuter, D.L.; Cummings, G.E.; Chou, C.K.; Vagliente, V.N.; Johnson, J.J.; Dong, R.G.

    1978-01-01

    The document has been prepared pursuant to the second meeting of the Senior Research Review Group of the Seismic Safety Margin Research Program (SSMRP), which was held on June 15, 16, 1978. The major portion of the material contained in the document is descriptions of specific subtasks to be performed on the SSMRP. This is preceded by a brief discussion of the objective of the SSMRP and the approach to be used. Specific subtasks to be performed in Phase I of the SSMRP are as follows: (1) plant/site selection, (2) seismic input, (3) soil structure interaction, (4) structural building response, (5) structural sub-system response, (6) fragility, (7) system analysis, and (8) Phase II task definition

  8. Program plan for shipment, receipt, and storage of the TMI-2 core. Revision 1

    International Nuclear Information System (INIS)

    Quinn, G.J.; Reno, H.W.; Schmitt, R.C.

    1985-01-01

    This plan addresses the preparation and shipment of core debris from Three Mile Island Unit 2 (TMI-2) to the Idaho National Engineering Laboratory (INEL) and receipt and storage of that core debris. The Manager of the Nuclear Materials Evaluation Programs Division of EG and G Idaho, Inc. will manage two separate but integrated programs, one located at TMI (Part 1) and the other at INEL (Part 2). The Technical Integration Office (at TMI) is responsible for developing and implementing Part 1, TMI-2 Core Shipment Program. The Technical Support Branch (at INEL) is responsible for developing and implementing Part 2, TMI-2 Core Receipt and Storage. The plan described herein is a revision of a previous document entitled Plan for Shipment, Storage, and Examination of TMI-2 Fuel. This revision was required to delineate changes, primarily in Part 2, Core Activities Program, of the previous document. That part of the earlier document related to core examination was reidentified in mid-FY-1984 as a separate trackable entity entitled Core Sample Acquisition and Examination Project, which is not included here

  9. 78 FR 6736 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-01-31

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern Volatile Organic Compound (VOC), oxides of nitrogen (NOX), and particulate matter (PM) emissions from open burning. We are approving local rules that regulate this emission source under the Clean Air Act (CAA or the Act).

  10. Westinghouse Hanford Company safety analysis reports and technical safety requirements upgrade program

    International Nuclear Information System (INIS)

    Busche, D.M.

    1995-09-01

    During Fiscal Year 1992, the US Department of Energy, Richland Operations Office (RL) separately transmitted the following US Department of Energy (DOE) Orders to Westinghouse Hanford Company (WHC) for compliance: DOE 5480.21, ''Unreviewed Safety Questions,'' DOE 5480.22, ''Technical Safety Requirements,'' and DOE 5480.23, ''Nuclear Safety Analysis Reports.'' WHC has proceeded with its impact assessment and implementation process for the Orders. The Orders are closely-related and contain some requirements that are either identical, similar, or logically-related. Consequently, WHC has developed a strategy calling for an integrated implementation of the three Orders. The strategy is comprised of three primary objectives, namely: Obtain DOE approval of a single list of DOE-owned and WHC-managed Nuclear Facilities, Establish and/or upgrade the ''Safety Basis'' for each Nuclear Facility, and Establish a functional Unreviewed Safety Question (USQ) process to govern the management and preservation of the Safety Basis for each Nuclear Facility. WHC has developed policy-revision and facility-specific implementation plans to accomplish near-term tasks associated with the above strategic objectives. This plan, which as originally submitted in August 1993 and approved, provided an interpretation of the new DOE Nuclear Facility definition and an initial list of WHC-managed Nuclear Facilities. For each current existing Nuclear Facility, existing Safety Basis documents are identified and the plan/status is provided for the ISB. Plans for upgrading SARs and developing TSRs will be provided after issuance of the corresponding Rules

  11. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Science.gov (United States)

    2011-09-23

    ... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...

  12. Digital Problems and Strategies of Partial Revision in Overall Plan of Land Use

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The technical route of partial revision in overall plan of land use is briefly described.It is pointed out that problems of area measuring in the technical route are mainly due to the digital process.The digital problems of partial revision in overall plan of land use are presented as follows:the maps are not proofread before digitalization;the coordinate matching and projection transformation are not conducted on the maps;the information is asymmetrical pre and post the digitalization;the location lacks precision;the result maps are substandard.The causes of these problems are analyzed,which cover the following aspects.The lack of united management regulations;uneven working abilities of the staff in the compilation units;unawareness of the importance of map digilalization;poor basic conclitions of the original plan maps.At last,the relevant suggestions are put forward,for instance,releasing the national united management methods and technical criteria,establishing industrial admittance system and qualification system of complication units,setting up the mechanism of supervising digitalized results and controlling the quality,conducting coordinate matching and projection transformation and unifying the specification and mode of the results of maps so as to provide technical support for the overall plan of land use,play the micro-regulating role of land use and take a leading role in the sustainable development of social economy.

  13. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Sacramento Metropolitan Air Quality...

  14. Demonstration testing and evaluation of in situ soil heating. Health and safety plan (Revision 2)

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.

    1994-12-28

    This document is the Health and Safety Plan (HASP) for the demonstration of IITRI`s EM Treatment Technology. In this process, soil is heated in situ by means of electrical energy for the removal of hazardous organic contaminants. This process will be demonstrated on a small plot of contaminated soil located in the Pit Area of Classified Burial Ground K-1070-D, K-25 Site, Oak Ridge, TN. The purpose of the demonstration is to remove organic contaminants present in the soil by heating to a temperature range of 85{degrees} to 95{degrees}C. The soil will be heated in situ by applying 60-Hz AC power to an array of electrodes placed in boreholes drilled through the soil. In this section a brief description of the process is given along with a description of the site and a listing of the contaminants found in the area.

  15. Demonstration testing and evaluation of in situ soil heating. Health and safety plan (Revision 2)

    International Nuclear Information System (INIS)

    Dev, H.

    1994-01-01

    This document is the Health and Safety Plan (HASP) for the demonstration of IITRI's EM Treatment Technology. In this process, soil is heated in situ by means of electrical energy for the removal of hazardous organic contaminants. This process will be demonstrated on a small plot of contaminated soil located in the Pit Area of Classified Burial Ground K-1070-D, K-25 Site, Oak Ridge, TN. The purpose of the demonstration is to remove organic contaminants present in the soil by heating to a temperature range of 85 degrees to 95 degrees C. The soil will be heated in situ by applying 60-Hz AC power to an array of electrodes placed in boreholes drilled through the soil. In this section a brief description of the process is given along with a description of the site and a listing of the contaminants found in the area

  16. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11 Section 244.11 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD...

  17. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) and oxides of sulfur source categories for the AVAQMD and SJVUAPCD. We are approving these negative declarations under the Clean Air Act as amended in 1990 (CAA or the Act).

  18. 76 FR 67366 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-01

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These revisions concern oxides of nitrogen (NOX) emissions from industrial, institutional and commercial boilers, stationary internal combustion engines and water heaters. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  19. 76 FR 26192 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Science.gov (United States)

    2011-05-06

    ...EPA is taking direct final action to approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts are required under Part C of title I of the Clean Air Act (CAA) to adopt and implement SIP-approved Prevention of Significant Deterioration (PSD) permit programs. These revisions update the definitions used in the districts' PSD permit programs.

  20. 76 FR 39303 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ...EPA is taking direct final action to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District (KCAPCD), and Ventura County Air Pollution Control District (VCAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from architectural coating operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  1. 75 FR 57597 - Revised Proposal for Revisions to the Schedules of Civil Penalties for a Violation of a Federal...

    Science.gov (United States)

    2010-09-21

    ... Revisions to the Schedules of Civil Penalties for a Violation of a Federal Railroad Safety Law or Federal... railroad safety laws and regulations are necessary because many of FRA's civil penalties have not been..., et al. Revised Proposal for Revisions to the Schedules of Civil Penalties for a Violation of a...

  2. International comparison of safety criteria applied to radwaste repositories. Safety aspects of the post-operational phase

    International Nuclear Information System (INIS)

    Baltes, B.

    1994-01-01

    There is a generally accepted system of framework safety conditions governing the construction, operation, and post-operational monitoring of radwaste repositories. Although the development of these framework conditions may vary from country to country, the resulting criteria are based on the commonly accepted system of priciples and purposes established for ultimate radioactive waste disposal. The experience accumulated by GRS in the course of the plan approval procedure for the Konrad mine site and the safety-relevant studies performed for the planned Morsleben repository clearly show demand for further development of the safety criteria. In Germany, it is especially the safety criteria and detailed requirements filling the framework safety conditions that need revision and in-depth definition, as well as comparison and harmonisation with internationally applied criteria. These activities will particularly consider the international convention on radioactive waste management currently in preparation under the auspieces of the IAEA. (orig.) [de

  3. Sign up to Safety: developing a safety improvement plan.

    Science.gov (United States)

    Dight, Carol; Peters, Hayley

    2015-04-01

    The Sign up to Safety (SutS) programme was launched in June 2014 by health secretary Jeremy Hunt. It focuses on listening to patients, carers and staff, learning from what they say when things go wrong, and then taking action to improve patient safety. The programme aims to make the NHS the safest healthcare system in the world by creating a culture devoted to continuous learning and improvement (NHS England 2014). Musgrove Park Hospital, part of Taunton and Somerset NHS Foundation Trust, was one of 12 NHS organisations that signed up to the SutS programme, making public its commitment to the national pledges to be 'open and transparent' and to develop a safety improvement plan. This paper describes the development of the strategy.

  4. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  5. Validation and verification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Ades, M.J.; Crowe, R.D.; Toffer, H.

    1991-04-01

    This report discusses a verification and validation (V ampersand V) plan for computer codes used for safety analysis and probabilistic risk assessment calculations. The present plan fulfills the commitments by Westinghouse Savannah River Company (WSRC) to the Department of Energy Savannah River Office (DOE-SRO) to bring the essential safety analysis and probabilistic risk assessment codes in compliance with verification and validation requirements

  6. 40 CFR Appendix A to Subpart III... - States With Approved State Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units

    Science.gov (United States)

    2010-07-01

    ... Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units A Appendix A to Subpart III of Part 97 Protection... BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR SO2 Opt-in Units Pt. 97, Subpt. III... Concerning CAIR SO2 Opt-In Units 1. The following States have State Implementation Plan revisions under § 51...

  7. Industrial hazard and safety handbook

    CERN Document Server

    King, Ralph W

    1979-01-01

    Industrial Hazard and Safety Handbook (Revised Impression) describes and exposes the main hazards found in industry, with emphasis on how these hazards arise, are ignored, are identified, are eliminated, or are controlled. These hazard conditions can be due to human stresses (for example, insomnia), unsatisfactory working environments, as well as secret industrial processes. The book reviews the cost of accidents, human factors, inspections, insurance, legal aspects, planning for major emergencies, organization, and safety measures. The text discusses regulations, codes of practice, site layou

  8. 75 FR 56131 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Science.gov (United States)

    2010-09-15

    ... on the MOCA network recommended in the 2008 Recovery Plan and will instead use the model results to... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N184; 10120-1113-0000-C2] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl...

  9. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Science.gov (United States)

    2010-05-26

    ...; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear Regulatory... Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093560837). The Office of Nuclear Security...

  10. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air Pollution Control District (MBUAPCD) and Santa Barbara County Air Pollution Control District (SCAPCD) portions of the California State Implementation Plan (SIP). We are proposing to approve revisions local rules that address emission statements for AVAQMD, rule rescissions that address public records for MBUAPCD, and define terms for SBCAPCD, under the Clean Air Act as amended in 1990 (CAA or the Act).

  11. 76 FR 71886 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from coatings and strippers used on wood products, wood paneling, and miscellaneous metal parts and products. We are approving these local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  12. 76 FR 71922 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ...EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality Management District (SMAQMD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from coatings and strippers used on wood products, wood paneling, and miscellaneous metal parts and products. We are proposing to approve three local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  13. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  14. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  15. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  16. 77 FR 42462 - Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval

    Science.gov (United States)

    2012-07-19

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval AGENCY: Occupational Safety and Health Administration (OSHA), Department of...

  17. 12 CFR 30.4 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... steps the bank will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance plans. Within 30 days after receiving a safety and... AND SOUNDNESS STANDARDS § 30.4 Filing of safety and soundness compliance plan. (a) Schedule for filing...

  18. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  19. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air...: EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions of the...

  20. 75 FR 24408 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-05-05

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on January 22, 2010 and concern oxides of nitrogen (NOx) emissions from residential water heaters. We are approving a local rule that regulates this emission source under the Clean Air Act as amended in 1990 (CAA or the Act).

  1. 77 FR 73322 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Science.gov (United States)

    2012-12-10

    ...EPA is taking direct final action to approve revisions to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern opacity standards related to multiple pollutants, including particulate matter (PM) emissions from several different types of sources, ranging from fugitive dust to gas turbines. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act).

  2. 77 FR 73392 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Science.gov (United States)

    2012-12-10

    ...EPA is proposing to approve revisions to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State Implementation Plan (SIP). This revision concerns opacity standards related to multiple pollutants, including particulate matter (PM) emissions from several different types of sources, ranging from fugitive dust to gas turbines. We are proposing to approve a local rule to regulate these emission sources under the Clean Air Act (CAA or the Act).

  3. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). We are proposing to approve revisions to local rules that define terms used in other air pollution regulations in these areas and a rule rescission that address Petroleum Coke Calcining Operations--Oxides of Sulfur, under the Clean Air Act as amended in 1990 (CAA or the Act).

  4. 76 FR 60376 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ...EPA is taking direct final action to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Sacramento Municipal Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from solvent cleaning machines and solvent cleaning operations and oil and gas production wells. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  5. 76 FR 60405 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ...EPA is proposing to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Sacramento Municipal Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from solvent cleaning machines and solvent cleaning operations and oil and gas production wells. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  6. 76 FR 5319 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-01-31

    ...EPA is proposing to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Placer County Air Pollution Control District (PCAPCD), Antelope Valley Air Quality Management District (AVAQMD), and Ventura County Air Pollution Control District (VCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from gasoline bulk plants, terminals and vehicle dispensing facilities. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  7. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  8. Yearly plan of safety research on environmental radioactivity for 1996 - 2000

    International Nuclear Information System (INIS)

    1996-01-01

    'Yearly Plan of Safety Research on Environmental Radioactivity' proposed from the special meeting for safety research of environmental radioactivity on December 14, 1995 was investigated by Nuclear Safety Commission. And the safety research of environmental radioactivity in Japan was decided to be pursued according to the plan. The contents of this plan consisted of the purpose and the contents of research as well as the research period and the facilities to be done for each theme. The following themes were included; 1) study on environment·radiation dose and study on radiation exposure reduction. 2) study on biological effects of radiation. 3) study on internal exposure by specified nuclides. 4) study on medical measures for acute radiation exposure. 5) study on assessment of nuclear safety. 6) investigation on radioactivities released from various nuclear facilities in Japan to demonstrate their safety. (M.N.)

  9. Committee on the safety of nuclear installations - Operating plan (2006 - 2009)

    International Nuclear Information System (INIS)

    2007-01-01

    In 2004, NEA issued its Strategic Plan covering the period 2005-2009, addressing the NEA activities associated with nuclear safety and regulation. Committee on the Safety of Nuclear Installations (CSNI) and Committee on Nuclear Regulatory Activities (CNRA), which have the primary responsibility for activities in this area, have developed and issued a joint strategic plan covering this same time period. As requested in the Joint Strategic Plan, each committee is to prepare an operating plan which describes in more detail the committee's organisation, planned activities, priorities and operating procedures to be used to implement the Joint Strategic Plan. In effect, the Joint Strategic Plan defines what type of work CSNI should do, whereas the Operating Plan describes the overall work scope and how to accomplish it to meet the joint CSNI/CNRA Strategic Plan objectives and mission. The present Operating Plan follows and takes into account the outcome of a CSNI assessment group, which has evaluated the CSNI activities. The assessment group expressed appreciation for the CSNI role and activity, while making recommendations with regards to scope of work and way to operate in order to further improve efficiency. The main objectives of CSNI are to: - Keep all member countries involved in and abreast of developments in safety technology. - Review operating experience with the objective to identify safety issues that need to be addressed by new research. - Review the state-of-knowledge on selected topics of nuclear safety technology and safety assessment. - Promote training and research projects that serve to maintain competence in nuclear safety matters. - Promote research as needed to reach consensus on nuclear safety issues of common interest. - Consider the safety implications of scientific and technical developments. To accomplish these objectives, CSNI is organised into six permanent working groups (as described in Section II), each covering a different set of

  10. 77 FR 24975 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Utah Prairie Dog

    Science.gov (United States)

    2012-04-26

    ...-FF06E00000] Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Utah Prairie Dog... Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened under the... recovery plan for the Utah prairie dog. The Service and other Federal agencies also will take these...

  11. Robustness via Run-Time Adaptation of Contingent Plans

    Science.gov (United States)

    Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)

    2000-01-01

    In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

  12. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Science.gov (United States)

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  13. Systematic safety evaluation of old nuclear power plants

    International Nuclear Information System (INIS)

    Dredemis, G.; Fourest, B.

    1984-01-01

    The French safety authorities have undertaken a systematic evaluation of the safety of old nuclear power plants. Apart from a complete revision of safety documents (safety analysis report, general operating rules, incident and accident procedures, internal emergency plan, quality organisation manual), this examination consisted of analysing the operating experience of systems frequently challenged and a systematic examination of the safety-related systems. This paper is based on an exercise at the Ardennes Nuclear Power Plant which has been in operation for 15 years. This paper also summarizes the main surveys and modifications relating to this power plant. (orig.)

  14. R&D for Safety Codes and Standards: Materials and Components Compatibility

    Energy Technology Data Exchange (ETDEWEB)

    Somerday, Brian P. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); LaFleur, Chris [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Marchi, Chris San [Sandia National Lab. (SNL-CA), Livermore, CA (United States)

    2015-08-01

    This project addresses the following technical barriers from the Safety, Codes and Standards section of the 2012 Fuel Cell Technologies Office Multi-Year Research, Development and Demonstration Plan (section 3.8): (A) Safety data and information: limited access and availability (F) Enabling national and international markets requires consistent RCS (G) Insufficient technical data to revise standards.

  15. 75 FR 24406 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2010-05-05

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD), Sacramento Metropolitan Air Quality Management District (SMAQMD), San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD), and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from petroleum facilities, chemical plants, and facilities which use organic solvents. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  16. 76 FR 5277 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-01-31

    ...EPA is taking direct final action to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Antelope Valley Air Quality Management District (AVAQMD), Ventura County Air Pollution Control District (VCAPCD) and Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from gasoline bulk plants, terminals and vehicle dispensing facilities. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  17. 75 FR 24544 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2010-05-05

    ...EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD), Sacramento Metropolitan Air Quality Management District (SMAQMD), San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD), and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from petroleum facilities, chemical plants, and facilities which use organic solvents. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  18. 78 FR 29032 - Approval and Promulgation of Implementation Plans Tennessee: Revisions to Volatile Organic...

    Science.gov (United States)

    2013-05-17

    ... of the term ``particulate matter emissions'' at 1200-03-09-.01(4)(b)47 (vi) as part of the definition... Promulgation of Implementation Plans Tennessee: Revisions to Volatile Organic Compound Definition AGENCY..., 1999, SIP adds 17 compounds to the list of compounds excluded from the definition of ``Volatile Organic...

  19. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-24

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura.... SUMMARY: EPA is finalizing approval of revisions to the Antelope Valley Air Quality Management District...

  20. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  1. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management...

  2. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-29

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  3. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  4. Classification of Radioactive Waste. General Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    This publication is a revision of an earlier Safety Guide of the same title issued in 1994. It recommends revised waste management strategies that reflect changes in practices and approaches since then. It sets out a classification system for the management of waste prior to disposal and for disposal, driven by long term safety considerations. It includes a number of schemes for classifying radioactive waste that can be used to assist with planning overall national approaches to radioactive waste management and to assist with operational management at facilities. Contents: 1. Introduction; 2. The radioactive waste classification scheme; Appendix: The classification of radioactive waste; Annex I: Evolution of IAEA standards on radioactive waste classification; Annex II: Methods of classification; Annex III: Origin and types of radioactive waste.

  5. Classification of Radioactive Waste. General Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This publication is a revision of an earlier Safety Guide of the same title issued in 1994. It recommends revised waste management strategies that reflect changes in practices and approaches since then. It sets out a classification system for the management of waste prior to disposal and for disposal, driven by long term safety considerations. It includes a number of schemes for classifying radioactive waste that can be used to assist with planning overall national approaches to radioactive waste management and to assist with operational management at facilities. Contents: 1. Introduction; 2. The radioactive waste classification scheme; Appendix: The classification of radioactive waste; Annex I: Evolution of IAEA standards on radioactive waste classification; Annex II: Methods of classification; Annex III: Origin and types of radioactive waste

  6. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  7. Implementing 10 CFR 830 at the FEMP Silos: Nuclear Health and Safety Plans as Documented Safety Analysis

    International Nuclear Information System (INIS)

    Fisk, Patricia; Rutherford, Lavon

    2003-01-01

    The objective of the Silos Project at the Fernald Closure Project (FCP) is to safely remediate high-grade uranium ore residues (Silos 1 and 2) and metal oxide residues (Silo 3). The evolution of Documented Safety Analyses (DSAs) for these facilities has reflected the changes in remediation processes. The final stage in silos DSAs is an interpretation of 10 CFR 830 Safe Harbor Requirements that combines a Health and Safety Plan with nuclear safety requirements. This paper will address the development of a Nuclear Health and Safety Plan, or N-HASP

  8. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  9. 76 FR 38575 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Northern Spotted Owl...

    Science.gov (United States)

    2011-07-01

    ... document availability: revised recovery plan. SUMMARY: We, the U.S. Fish and Wildlife Service, announce the... concluded that the integrity of the agency decisionmaking process for the spotted owl recovery plan was... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 17 [FWS-R1-ES-2011-N020; 10120...

  10. Nuclear waste: Department of Energy's Transuranic Waste Disposal Plan needs revision

    International Nuclear Information System (INIS)

    1986-01-01

    Transuranic waste consists of discarded tools, rags, machinery, paper, sheet metal, and glass containing man-made radioactive elements that can be dangerous if inhaled, ingested, or absorbed into the body through an open wound. GAO found that the Defense Waste Management Plan does not provide the Congress with complete inventory and cost data or details on environmental and safety issues related to the permanent disposal of TRU waste; the Plan's $2.8 billion costs are understated by at least $300 million. Further, it does not include costs for disposing of buried waste, contaminated soil, and TRU waste that may not be accepted at the Waste Isolation Pilot Plant. Lastly, the Plan provides no details on the environmental and safety issues related to the permanent disposal of TRU waste, nor does it discuss the types of or timing for environmental analyses needed before WIPP starts operating

  11. 75 FR 10690 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Science.gov (United States)

    2010-03-09

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Air Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on December 18, 2009 and concern reduction of animal matter and volatile organic compound (VOC) emissions from crude oil production, cutback asphalt, and petroleum solvent dry cleaning. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  12. 78 FR 21581 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Science.gov (United States)

    2013-04-11

    ...EPA is proposing to approve revisions to the Santa Barbara County Air Pollution Control District (SBCAPCD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) and oxides of nitrogen (NOX) emissions from gas-fired fan-type central furnaces, small water heaters, and the transfer and dispensing of gasoline. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act (CAA or the Act).

  13. 76 FR 38589 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0383; FRL-9428-1] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State...

  14. 76 FR 38572 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion of the... approving with the dates that they were adopted by the Antelope Valley Air Quality Management District...

  15. 75 FR 8008 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2010-02-23

    ... the California State Implementation Plan, Imperial County Air Pollution Control District AGENCY... limited disapproval of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of... soils in open and agricultural areas. We are proposing action on local rules that regulate these...

  16. 75 FR 69910 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Science.gov (United States)

    2010-11-16

    ...'s national Consumer Products rule. The TSD has more information on our evaluation. C. Public Comment... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...

  17. 76 FR 62004 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Science.gov (United States)

    2011-10-06

    ... Organic Compound Emission Standards for Consumer Products. B. Does the rule meet the evaluation criteria... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...

  18. 75 FR 15348 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision To Control...

    Science.gov (United States)

    2010-03-29

    ... to control volatile organic compound (VOC) emissions from storage tanks, transport vessels and marine... Promulgation of Air Quality Implementation Plans; Texas; Revision To Control Volatile Organic Compound..., Division 1 (Storage of Volatile Organic Compounds) and Subchapter F, Division 3 (Degassing or Cleaning of...

  19. Overview of IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Monti, Stefano

    2012-01-01

    The IAEA Action Plan represents a work programme to strengthen and improve nuclear safety world wide. The plan identifies actions for Member States and the IAEA. Success depends upon: • Cooperation between IAEA, Member States, and other stakeholders; • Availability of appropriate financial resources (MS voluntary contributions)

  20. 75 FR 15723 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Mariana Fruit...

    Science.gov (United States)

    2010-03-30

    ... Wildlife Service, announce the availability of the Draft Revised Recovery Plan for the Mariana Fruit Bat or... and assistance of a Recovery Team appointed by the U.S. Fish and Wildlife Service. Section 4(f) of the... life history and ecology, this recovery plan focuses on the first 10 years of the recovery process. As...

  1. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    Science.gov (United States)

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  2. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  3. LNG Safety Assessment Evaluation Methods

    Energy Technology Data Exchange (ETDEWEB)

    Muna, Alice Baca [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); LaFleur, Angela Christine [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-05-01

    Sandia National Laboratories evaluated published safety assessment methods across a variety of industries including Liquefied Natural Gas (LNG), hydrogen, land and marine transportation, as well as the US Department of Defense (DOD). All the methods were evaluated for their potential applicability for use in the LNG railroad application. After reviewing the documents included in this report, as well as others not included because of repetition, the Department of Energy (DOE) Hydrogen Safety Plan Checklist is most suitable to be adapted to the LNG railroad application. This report was developed to survey industries related to rail transportation for methodologies and tools that can be used by the FRA to review and evaluate safety assessments submitted by the railroad industry as a part of their implementation plans for liquefied or compressed natural gas storage ( on-board or tender) and engine fueling delivery systems. The main sections of this report provide an overview of various methods found during this survey. In most cases, the reference document is quoted directly. The final section provides discussion and a recommendation for the most appropriate methodology that will allow efficient and consistent evaluations to be made. The DOE Hydrogen Safety Plan Checklist was then revised to adapt it as a methodology for the Federal Railroad Administration’s use in evaluating safety plans submitted by the railroad industry.

  4. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  5. 76 FR 68638 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen...

    Science.gov (United States)

    2011-11-07

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen Oxides Budget Trading Program... pertains to regulatory language in its nitrogen oxides (NO X ) Budget Trading Program that inadvertently..., Nitrogen dioxide, Ozone, Sulfur oxides. Dated: October 25, 2011. W.C. Early, Acting Regional Administrator...

  6. 78 FR 21542 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Science.gov (United States)

    2013-04-11

    ...EPA is taking direct final action to approve revisions to the Santa Barbara County Air Pollution Control District (SBCAPCD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) and oxides of nitrogen (NOX) emissions from gas-fired fan-type central furnaces, small water heaters, and the transfer and dispensing of gasoline. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  7. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-20

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D&D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities.

  8. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D ampersand D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities

  9. Effects of the Original Versus Revised Bloom's Taxonomy on Lesson Planning Skills: A Turkish Study Among Pre-Service Teachers

    Science.gov (United States)

    Bümen, Nilay T.

    2007-07-01

    The original taxonomy of educational objectives, developed by Benjamin S.␣Bloom and his associates in the 1950s, was revised several decades later by a group of educationists and cognitive psychologists, who developed a revised taxonomy (RT). This article describes a Turkish study carried out among a group of pre-service teachers in order to compare the influence of the two systems on lesson planning skills. The results confirmed other studies that have indicated a number of advantages of the revised system over the earlier one.

  10. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-09-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9711-2] Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  11. 76 FR 40237 - Approval and Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions...

    Science.gov (United States)

    2011-07-08

    ... words EPA, we, us or our mean or refer to the United States Environmental Protection Agency. (iii) The... no federal requirement for minor source BACT. To the extent the commenter makes this argument, EPA... Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the Administrative...

  12. 76 FR 59338 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Science.gov (United States)

    2011-09-26

    ... to other minor administrative changes to the Administrative Rules of Montana. The intended effect of... words EPA, we, us or our mean or refer to the United States Environmental Protection Agency. (iii) The... Promulgation of Air Quality Implementation Plans; Montana; Revisions to the Administrative Rules of Montana...

  13. 75 FR 3993 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Science.gov (United States)

    2010-01-26

    ... include minor editorial and grammatical changes, updates to the citations and references to federal and... otherwise. (ii) The words EPA, we, us or our mean or refer to the United States Environmental Protection... Promulgation of Air Quality Implementation Plans; Montana; Revisions to the Administrative Rules of Montana...

  14. Containment Emergency Sump Performance. Technical findings related to Unresolved Safety Issue A-43. Revision 1

    International Nuclear Information System (INIS)

    1985-10-01

    This report summarizes key technical findings related to Unresolved Safety Issue (USI) A-43, Containment Emergency Sump Performance. Both BWRs and PWRs are considered in this report. Emergency core cooling systems require a clean, reliable water source to maintain long-term recirculation following a loss-of-coolant accident (LOCA). PWRs rely on the containment emergency sump to provide such a water supply to residual heat removal pumps and containment spray pumps. BWRs rely on pump suction intakes in the suppression pool or wet well to provide water to residual heat removal and core spray systems. Thus, the technical findings in this report provide information on post-LOCA recirculation. These findings have been derived from extensive experimental studies, generic plant studies, and assessments of sumps used for long-term cooling. Results of hydraulic tests have shown that the potential for air ingestion is less severe than previously hypothesized. The effects of debris blockage on NPSH margin must be dealt with on a plant-specific basis. These findings have been used to develop revisions to Regulatory Guide 1.82 and Standard Review Plan Section 6.2.2 (NUREG-0800)

  15. Evaluation procedure of software safety plan for digital I and C of KNGR

    International Nuclear Information System (INIS)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4

  16. Evaluation procedure of software safety plan for digital I and C of KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4.

  17. [Implementation of a safety and health planning system in a teaching hospital].

    Science.gov (United States)

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  18. Occupational exposures worldwide and revision of international standards for protection

    International Nuclear Information System (INIS)

    Czarwinski, R.; Crick, M. J.

    2011-01-01

    United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR) has become the world authority on the levels and effects of ionising radiation. Since 1975, UNSCEAR has evaluated inter alia the level of occupational exposure worldwide. Based on revised questionnaires, more detailed information is now available. The results of the last evaluation (1995-2002) will be shown in the paper. Lessons learned from the responses by UN Member States will be given, as well as an outline of plans for data collection in future cycles. The requirements for protection against exposure to ionising radiation of workers, the public and patients are established in the International Basic Safety Standards for Protection against Ionising Radiation and for the Safety of Radiation Sources (BSS), published in 1996. As a result of a review of the BSS in 2006, the International Atomic Energy Agency (IAEA) started a process for the revision of these standards in 2007. International organisations including the joint sponsoring organisations of the BSS-IAEA, FAO, ILO, OECD/NEA, PAHO and WHO-as well as potential new joint sponsoring organisations of the revised BSS-the European Commission and UNEP-were involved from the beginning in the revision process. The paper also provides a summary of the status of the Draft Revised BSS and describes the new format. The paper focuses, in particular, on requirements for the protection of workers as well as record keeping requirements, which provide the legal basis for the collection of specific data; these data are of the type that can be used by UNSCEAR. (authors)

  19. 76 FR 5276 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-01-31

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Nitrogen dioxide...

  20. 76 FR 37044 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-06-24

    ... premature mortality, aggravation of respiratory and cardiovascular disease, decreased lung function... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of...

  1. 75 FR 2796 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Science.gov (United States)

    2010-01-19

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Air Pollution Control District portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on June 16, 2009 and concern volatile organic compound (VOC) emissions from coating of metal parts, large appliances, metal furniture, motor vehicles, mobile equipment, cans, coils, organic solvent cleaning, and storage and disposal related to such operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  2. 76 FR 16696 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-03-25

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on November 5, 2010 and concern oxides of nitrogen (NOX), carbon monoxide (CO), oxides of sulfur (SO2) and particulate matter emissions from boilers, steam generators and process heaters greater than 5.0 MMbtu/hour. We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  3. Preparation of site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This safety guidelines is issued as a lead document to facilitate preparation of specific site manuals by the responsible organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publications on the subject: Safety manual on site emergency plan on nuclear installations. AERB/SM/NISD-1, 1986 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come about in a significant manner after the accidents at Chernobyl and Bhopal

  4. 200 West Area Ash Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The Ash Pit Demolition Site had two known demolition events, the first occurred in November of 1984, and the second occurred in June of 1986. These demolition events were a form of thermal treatment for discarded explosive chemical products. Because the Ash Pit Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations'', Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 200 West Area Ash Pit Demolition Site Closure Plan consists of a Part A, Form 3, Dangerous Waste Permit Application (Revision 4) and a closure plan. An explanation of the Part A, Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the Ash,Pit Demolition Site, the history of the waste treated, and the approach that will be followed to close the Ash Pit Demolition Site. Because there were no radioactively contaminated chemicals involved in the demolitions, the information on radionuclides is provided for ''information only''. Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from Ash Pit Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  5. 76 FR 23630 - Office of New Reactors; Proposed Revision 2 to Standard Review Plan, Section 1.0 on Introduction...

    Science.gov (United States)

    2011-04-27

    ... Standard Review Plan, Section 1.0 on Introduction and Interfaces AGENCY: Nuclear Regulatory Commission (NRC... Revision 2 to Standard Review Plan (SRP), Section 1.0, ``Introduction and Interfaces'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110110573). The Office of New Reactors (NRO...

  6. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... submit regulations that control the primary and secondary National Ambient Air Quality Standards (NAAQS...

  7. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of.... * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management District. (1) Rule 1159...

  8. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid...

  9. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of.... * * * * * (c) * * * (378) * * * (i) * * * (E) Feather River Air Quality Management District. (1) Rule 3.22...

  10. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... Governor's Designee. (i) Incorporation by reference. (A) South Coast Air Quality Management District. (1...

  11. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-26

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...'s Designee. (i) Incorporation by Reference. (A) South Coast Air Quality Management District. (1...

  12. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-09-19

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Standards (NAAQS). The revisions to the primary and secondary Lead NAAQS were to provide increased...

  13. 76 FR 52623 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-08-23

    ... respiratory and cardiovascular disease, decreased lung function, visibility impairment, and damage to... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of...

  14. 75 FR 28509 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-05-21

    ..., aggravation of respiratory and cardiovascular disease, decreased lung function, visibility impairment, and... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of...

  15. 76 FR 56706 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-14

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental...

  16. 75 FR 21221 - Plan Revision for Kaibab National Forest; Coconino, Yavapai, and Mojave Counties; AZ

    Science.gov (United States)

    2010-04-23

    ..., including the identification of management indicator species (MIS). It may also make new special area... identification of the types of decisions that will not be made within the revised forest plan. The authorization... characteristics such as spacing tree groups and tree density; and disturbance patterns such as frequency, severity...

  17. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-03-22

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  18. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    International Nuclear Information System (INIS)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-01-01

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE's requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information

  19. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  20. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    Science.gov (United States)

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  1. 76 FR 31381 - Office Of New Reactors; Proposed Revision 4 to Standard Review Plan; Section 8.1 on Electric...

    Science.gov (United States)

    2011-05-31

    ... Standard Review Plan; Section 8.1 on Electric Power--Introduction AGENCY: U.S. Nuclear Regulatory...,'' on a proposed Revision 4 to Standard Review Plan (SRP), Section 8.1 on ``Electric Power--Introduction,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111180542). The previous version of...

  2. 76 FR 55581 - Revision to the California State Implementation Plan; Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan; Yolo-Solano Air Quality Management District AGENCY: Environmental... revision to the Yolo-Solano Air Quality Management District portion of the California State Implementation...-Solano Air Quality Management District (YSAQMD) Rule 2.41, adopted on September 10, 2008, and submitted...

  3. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9432-1] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  4. 76 FR 29182 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0030; FRL-9308-4] Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... the Mojave Desert Air Quality Management District (MDAQMD) portion of the California State...

  5. 77 FR 23133 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (Yolo-Solano AQMD) portion of the.... * * * * * (381) * * * (i) * * * (I) Yolo-Solano Air Quality Management District. (1) Rule 2.3, ``Ringelmann Chart...

  6. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... limited disapproval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of... designated nonattainment for the fine particulate matter (PM2.5) National Ambient Air Quality Standards...

  7. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0503; FRL-9183-5] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  8. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0897; FRL-9499-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  9. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0286; FRL-9138-7] Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State...

  10. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California..., this action: Is not a ``significant regulatory action'' subject to review by the Office of Management...

  11. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of...,'' Northeast States for Coordinated Air Use Management, December 2000. B. Does the rule meet the evaluation...

  12. 75 FR 1715 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-01-13

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVAPCD) portion of the...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  13. 76 FR 69135 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-08

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  14. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is required. 1106.3 Section 1106.3 Transportation Other Regulations Relating to Transportation (Continued... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS...

  15. The advanced neutron source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1989-01-01

    The Advanced Neutron Source (ANS) is a user facility for all areas of neutron research proposed for construction at the Oak Ridge National Laboratory. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements [which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies] into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences. 8 refs., 2 tabs

  16. The Advanced Neutron Source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1990-01-01

    The Advanced Neutron Source (ANS) is a user facility proposed for construction at the Oak Ridge National Laboratory for all areas of neutron research. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements (which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies) into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences

  17. Russian MINATOM nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    1999-03-01

    The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)

  18. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    2002-05-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  19. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    1999-09-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  20. USNRC regulatory guidance for engineered safety feature air cleaning systems

    International Nuclear Information System (INIS)

    Bellamy, R.R.

    1991-01-01

    The need for clear, technically appropriate, and easily implementable guidance for the design, testing, and maintenance of nuclear air cleaning systems has long been recognized. Numerous industry consensus standards have been issued and revised over the last 30 years. Guidance has also been published by the US Nuclear Regulatory Commission in the form of regulations, regulatory guides, standard review plans, NUREG documents, and information notices. This paper will summarize the latest revisions to these documents and emphasize Regulatory Guide 1.52, Design, Testing, and Maintenance Criteria for Post-Accident Engineered-Safety-Feature Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants, which was last revised in 1978. The USNRC has undertaken a project to revise this regulatory guide, and the status of that revision is highlighted

  1. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  2. Management plan for White Oak Dam. Revision 1

    International Nuclear Information System (INIS)

    Ahmed, S.B.

    1997-03-01

    The purpose is to provide operation and maintenance, periodic inspection, and emergency action plans for White Oak Dam in general accordance with the Federal Emergency Management Agency (FEMA) guidelines for dam safety. It must be understood that operations at the site are primarily for purposes of environmental monitoring, environmental protection and waste management operations control. Effluent is generally allowed to flow from the lake at its natural rate by rising above the broad crested weir notch elevation of 744 feet m.s.l

  3. 76 FR 29153 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... approve revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of the California... approving with the dates that they were adopted by the Mojave Desert Air Quality Management District (MDAQMD...

  4. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM...

  5. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-13

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); does...

  6. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... California State Implementation Plan; South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District portion of the California State Implementation... Submittal A. What rule did the State submit? We are approving South Coast Air Quality Management District...

  7. 77 FR 32398 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... action: Is not a ``significant regulatory action'' subject to review by the Office of Management and...

  8. 77 FR 22676 - Revisions to the Arizona State Implementation Plan, Pinal County Air Quality Control District

    Science.gov (United States)

    2012-04-17

    ... the Arizona State Implementation Plan, Pinal County Air Quality Control District AGENCY: Environmental... disapproval of a revision to the Pinal County Air Quality Control District portion of the Arizona State... the Control Officer to determine whether the manner of control of fugitive emissions is satisfactory...

  9. 75 FR 15648 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Discrete...

    Science.gov (United States)

    2010-03-30

    ... Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Discrete Emission Credit Banking and... Air Quality Rules, Subchapter H--Emissions Banking and Trading, Division 4--Discrete Emission Credit Banking and Trading, referred to elsewhere in this notice as the Discrete Emission Reduction Credit (DERC...

  10. 75 FR 27644 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Discrete...

    Science.gov (United States)

    2010-05-18

    ... Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Discrete Emission Credit Banking and... Rules, Subchapter H--Emissions Banking and Trading, Division 4--Discrete Emission Credit Banking and Trading, referred to elsewhere in this notice as the Discrete Emission Reduction Credit (DERC) Program...

  11. 77 FR 214 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-04

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approval of revisions to the San Joaquin Valley Air Pollution Control District (SJVUAPCD) portion of the... used by the California Air Resources Board and air districts for evaluating air pollution control...

  12. 76 FR 31242 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Science.gov (United States)

    2011-05-31

    ... the California State Implementation Plan, Santa Barbara County Air Pollution Control District AGENCY... limited disapproval of revisions to the Santa Barbara County Air Pollution Control District (SBCAPCD... BTU/hr and internal combustion engines with a rated brake horse power of 50 or greater. Under...

  13. 76 FR 56134 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-12

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... preempt Tribal law. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  14. 75 FR 60623 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-10-01

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approval and limited disapproval of revisions to the San Joaquin Valley Unified Air Pollution Control... 30, 2008) \\2\\; and Ventura County Air Pollution Control District (VCAPCD) Rule 74.15 (as amended...

  15. 75 FR 57862 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-09-23

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... section 307(b)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  16. 76 FR 35167 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-06-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0312; FRL-9319-8] Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations...

  17. Planning and evaluation of plant under safety aspects

    International Nuclear Information System (INIS)

    Strnad, H.

    1985-01-01

    Plant denotes a technical product characterized as being structured, complex, comprising the use of energy, and that of measuring, automatic control and monitoring systems to keep track of present, control and monitor processes. Particular attention is paid to methods of developing plant concepts, measures to exclude or detect risks, integration of safety engineering into the course of planning, safety concept and ergonomics in plant design. (DG) [de

  18. 218-E-8 Borrow Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The 218-E-8 Demolition Site was the site of a single demolition event in November of 1984. This demolition event was a form of thermal treatment for discarded explosive chemical products. Because the 218-E-8 Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations,'' Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 218-E-8 Borrow Pit Demolition Site Closure Plan consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3, Revision 4, and a closure plan. An explanation of the Part A Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the 218-E-8 Demolition Site, the history of the waste treated, and the approach that will be followed to close the 218-E-8 Demolition Site. Because there were no radioactively contaminated chemicals involved in t he demolitions at the 218-E-8 Borrow Pit site, the information on radionuclides is provided for ''information only.'' Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from 218-E-8 Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  19. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  20. 76 FR 56132 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-12

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... did the State submit? B. Are there other versions of this rule? C. What is the purpose of the...

  1. 75 FR 15645 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Emission...

    Science.gov (United States)

    2010-03-30

    ... clarify EPA's role in the approval of emission quantification protocols. While the previous SIP- approved... approve severable portions of two revisions to the Texas State Implementation Plan (SIP) submitted by the... to further clarify procedures for using emission protocols and to update the approved list of...

  2. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  3. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  4. 77 FR 58488 - Hawaii State Plan for Occupational Safety and Health

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health AGENCY: Occupational... announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State...

  5. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  6. A report on developing a checklist to assess company plans focused on improving safety awareness, safe behaviour and safety culture: final report

    NARCIS (Netherlands)

    Steijger, N.; Starren, H.; Keus, M.; Gort, J.; Vervoort, M.

    2003-01-01

    This report describes the process of developing a checklist to asses company plans focused on improving safety awareness, safe behaviour and safety culture. These plans are part of a programme initiated by the Ministry of Social Affairs and Employment aiming at improving the safety performance of

  7. Safety issue resolution strategy plan for inactive miscellaneous underground storage tanks

    International Nuclear Information System (INIS)

    Wang, O.S.; Powers, T.B.

    1994-09-01

    The purpose of this strategy plan is to identify, confirm, and resolve safely issues associated with inactive miscellaneous underground storage tanks (MUSTs) using a risk-based priority approach. Assumptions and processes to assess potential risks and operational concerns are documented in this report. Safety issue priorities are ranked based on a number of considerations including risk ranking and cost effectiveness. This plan specifies work scope and recommends schedules for activities related to resolving safety issues, such as collecting historical data, searching for authorization documents, performing Unreviewed Safety Question (USQ) screening and evaluation, identifying safety issues, imposing operational controls and monitoring, characterizing waste contents, mitigating and resolving safety issues, and fulfilling other remediation requirements consistent with the overall Tank Waste Remediation System strategy. Recommendations for characterization and remediation are also recommended according to the order of importance and practical programmatic consideration

  8. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  9. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  10. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    International Nuclear Information System (INIS)

    Sweeney, M.D.

    1995-01-01

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations

  11. DARHT: INTEGRATION OF AUTHORIZATION BASIS REQUIREMENTS AND WORKER SAFETY

    International Nuclear Information System (INIS)

    MC CLURE, D. A.; NELSON, C. A.; BOUDRIE, R. L.

    2001-01-01

    This document describes the results of consensus agreements reached by the DARHT Safety Planning Team during the development of the update of the DARHT Safety Analysis Document (SAD). The SAD is one of the Authorization Basis (AB) Documents required by the Department prior to granting approval to operate the DARHT Facility. The DARHT Safety Planning Team is lead by Mr. Joel A. Baca of the Department of Energy Albuquerque Operations Office (DOE/AL). Team membership is drawn from the Department of Energy Albuquerque Operations Office, the Department of Energy Los Alamos Area Office (DOE/LAAO), and several divisions of the Los Alamos National Laboratory. Revision 1 of the DARHT SAD had been written as part of the process for gaining approval to operate the Phase 1 (First Axis) Accelerator. Early in the planning stage for the required update of the SAD for the approval to operate both Phase 1 and Phase 2 (First Axis and Second Axis) DARHT Accelerator, it was discovered that a conflict existed between the Laboratory approach to describing the management of facility and worker safety

  12. Savannah River Site integrated stabilization management plan. Revision 3

    International Nuclear Information System (INIS)

    Geddes, R.L.; Barone, A.; Shook, H.E.; Varner, C.E.; Rollins, R.

    1996-01-01

    On May 26, 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 94-1. The concern is that the halt in production of materials to be used in nuclear weapons froze the manufacturing pipeline in a state that, for safety reasons, should not be allowed to persist unremediated. This recommendation had eight specific sub-recommendations that dealt with the potential problems. Specifically, the Board expressed concern about certain liquids and solids containing fissile materials and other radioactive substances located in spent fuel storage pools, reactor basins, reprocessing canyons; and various other facilities once used for processing and weapons manufacture. The WSRC and DOE-SR acknowledges and shares the Board's concerns and has developed this Integrated Stabilization Management Plan (ISMP) to aggressively address these urgent problems in a systems engineering approach

  13. OIE philosophy, policy and procedures for the development of food safety standards.

    Science.gov (United States)

    Droppers, W F G L

    2006-08-01

    Food safety was identified as a high priority area in the 2001-2005 World Organisation for Animal Health (OIE) Strategic Plan. Member Countries of the OIE considered that the organisation should be more active in issues of public health and consumer protection and that this should include more involvement in the area of diseases or pathogens transmissible through food, whether or not animals are affected by such diseases or pathogens. A permanent Working Group on Animal Production Food Safety was established in 2002 to coordinate the OIE's activities in food safety. The Working Group was requested to focus on food safety measures applicable at farm level and to monitor the ongoing cooperation between the OIE and Codex Alimentarius. More emphasis is now placed on the public health aspects of a disease when OIE standards are developed or revised. For example, the revised chapter on bovine tuberculosis in the Terrestrial Animal Health Code includes food safety recommendations for meat and meat products and for milk and milk products. The revised chapter was approved by the OIE International Committee of Member Countries at their 73rd General Session in May 2005. More chapters will follow, beginning with a chapter addressing bovine brucellosis.

  14. Plan for safety case of spent fuel repository at Olkiluoto

    International Nuclear Information System (INIS)

    Vieno, T.; Ikonen, A.T.K.

    2005-02-01

    Posiva aims to present the Safety Case supporting the construction license application of the spent fuel repository at Olkiluoto by 2012. An outline and preliminary assessments will be presented in 2009. Interim reporting and an update of the Safety Case plan will be presented in 2006, as required by the authorities. The KBS-3 disposal concept aims at long-term isolation and containment of spent fuel assemblies in durable copper-iron canisters emplaced in a repository to be constructed at a depth between 400 and 600 metres in crystalline bedrock. By 2012, studies on the KBS-3 disposal concept and site investigations at Olkiluoto will have been continued over about thirty years. The construction of an underground rock characterisation facility (called ONKALO) was started in June 2004. The investigations are carried out in close cooperation with the Swedish SKB developing and assessing the same disposal concept at candidate sites, resembling Olkiluoto, at the other side of the Baltic Sea. A safety case is the synthesis of evidence, analyses and arguments that quantify and substantiate the safety, and the level of expert confidence in the safety, of a planned repository. Posiva's Safety Case will be organised in a portfolio including ten main reports, which will be periodically updated according the overall schedule presented in the plan. The Site report describing the present state and past evolution of the Olkiluoto site, as well as the disturbances caused by the construction of ONKALO and the first stage of the repository, forms the geoscientific basis of the Safety Case. The engineering basis is provided by the reports on the Characteristics of spent fuel, Canister design, and Repository design. The Process report containing descriptions and analyses of features, events and processes potentially affecting the disposal system, and the report on the Evolution of site and repository form the scientific basis of the Safety Case. The latter report will describe and

  15. School Climate: An Essential Component of a Comprehensive School Safety Plan

    Science.gov (United States)

    Stark, Heidi

    2017-01-01

    The intentional assessment and management of school climate is an essential component of a comprehensive school safety plan. The value of this preventive aspect of school safety is often diminished as schools invest resources in physical security measures as a narrowly focused effort to increase school safety (Addington, 2009). This dissertation…

  16. 78 FR 12267 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Science.gov (United States)

    2013-02-22

    ...EPA is proposing a limited approval and limited disapproval of permitting rules submitted by California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). These rules were adopted by the PCAPCD and FRAQMD to regulate the construction and modification of stationary sources of air pollution within each District. EPA is proposing to approve these SIP revisions based on the Agency's conclusion that the rules are consistent with applicable Clean Air Act (CAA) requirements, policies and guidance. Final approval of these rules would make the rules federally enforceable and correct program deficiencies identified in a previous EPA rulemaking (76 FR 44809, July 27, 2011).

  17. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Krenzien, Susan [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2012-10-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  18. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  19. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  20. Transportation Safety Excellence in Operations Through Improved Transportation Safety Document

    International Nuclear Information System (INIS)

    Dr. Michael A. Lehto; MAL

    2007-01-01

    A recent accomplishment of the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) Nuclear Safety analysis group was to obtain DOE-ID approval for the inter-facility transfer of greater-than-Hazard-Category-3 quantity radioactive/fissionable waste in Department of Transportation (DOT) Type A drums at MFC. This accomplishment supported excellence in operations through safety analysis by better integrating nuclear safety requirements with waste requirements in the Transportation Safety Document (TSD); reducing container and transport costs; and making facility operations more efficient. The MFC TSD governs and controls the inter-facility transfer of greater-than-Hazard-Category-3 radioactive and/or fissionable materials in non-DOT approved containers. Previously, the TSD did not include the capability to transfer payloads of greater-than-Hazard-Category-3 radioactive and/or fissionable materials using DOT Type A drums. Previous practice was to package the waste materials to less-than-Hazard-Category-3 quantities when loading DOT Type A drums for transfer out of facilities to reduce facility waste accumulations. This practice allowed operations to proceed, but resulted in drums being loaded to less than the Waste Isolation Pilot Plant (WIPP) waste acceptance criteria (WAC) waste limits, which was not cost effective or operations friendly. An improved and revised safety analysis was used to gain DOE-ID approval for adding this container configuration to the MFC TSD safety basis. In the process of obtaining approval of the revised safety basis, safety analysis practices were used effectively to directly support excellence in operations. Several factors contributed to the success of MFC's effort to obtain approval for the use of DOT Type A drums, including two practices that could help in future safety basis changes at other facilities. (1) The process of incorporating the DOT Type A drums into the TSD at MFC helped to better integrate nuclear safety

  1. Manpower development for safe operation of nuclear power plant. China. Revision of final safety analysis report. Activity: 5.1.3-Task-08. Technical report

    International Nuclear Information System (INIS)

    Almeida, C.; Elias, D.

    1994-01-01

    The objectives of this mission included providing assistance for the revision of the FSAR including: national practices, administrative procedures, required staffing level, other resources, planning, scheduling, content, and organization of the revision. Activities included several days of lectures regarding worldwide practices including the United States and Commonwealth Edison Company (ComEd), interaction with Chinese counterparts re. their FSAR and Technical Specification revision and two visits to the Qin Shan NPP

  2. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  3. 78 FR 47241 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the...

    Science.gov (United States)

    2013-08-05

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the Human Health Water Quality Criteria for PCBs in Zones 2... hold a public hearing to receive comments on proposed amendments to the Commission's Water Quality...

  4. 76 FR 53482 - Endangered and Threatened Wildlife and Plants; Notice of Availability of a Revised Recovery Plan...

    Science.gov (United States)

    2011-08-26

    ... and revised the recovery plan accordingly. The desert tortoise is a large, herbivorous reptile that... tortoise populations. Disease and increased incidence of fire in the Mojave Desert have also been... tortoises, there are few data available to evaluate or quantify the effects of threats on desert tortoise...

  5. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  6. 77 FR 745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0547; FRL-9480-1] Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) Correction In rule document 2011-33660 appearing on pages 214-217 in the issue of Wednesday, January 4, 2012, make the following corrections...

  7. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  8. Preparation of off-site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This document is issued as a lead document to facilitate preparation of specific site manuals by the Responsible Organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publication on the subject: Safety Manual on Off-Site Emergency Plan for Nuclear Installations, AERB/SM/NISD-2, 1988 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come out in a significant manner after the accidents at Chernobyl and Bhopal

  9. The evolving role and care management approaches of safety-net medicaid managed care plans

    OpenAIRE

    Gusmano, Michael K.; Sparer, Michael S.; Brown, Lawrence D.; Rowe, Catherine; Gray, Bradford

    2002-01-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods we studied these “safety-net” health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also f...

  10. Status report on resolution of Waste Tank Safety Issues at the Hanford Site. Revision 1

    International Nuclear Information System (INIS)

    Dukelow, G.T.; Hanson, G.A.

    1995-05-01

    The purpose of this report is to provide and update the status of activities supporting the resolution of waste tank safety issues and system deficiencies at the Hanford Site. This report provides: (1) background information on safety issues and system deficiencies; (2) a description of the Tank Waste Remediation System and the process for managing safety issues and system deficiencies; (3) changes in safety issue description, prioritization, and schedules; and (4) a summary of the status, plans, order of magnitude, cost, and schedule for resolving safety issues and system deficiencies

  11. Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan

    International Nuclear Information System (INIS)

    1996-07-01

    The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98

  12. Therapeutic risk management of the suicidal patient: safety planning.

    Science.gov (United States)

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  13. Planned revision to DOE Order 5820.2A, Radioactive Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G.J. [Dept. of Energy, Washington, DC (United States); Williams, R.E.; Kudera, D.E. [EG and G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Bailey, D.E. [NJG, Inc. (United States)

    1993-03-01

    US Department of Energy Headquarters initiated efforts to revise DOE Order 5820.2A, ``Radioactive Waste Management``. The purpose of the revision is to enhance DOE waste management requirements, reflect new DOE organizational responsibilities, and consolidate requirements for management of all waste, under the responsibility of Environmental Restoration and Waste Management, into a single order. This paper discusses the revision philosophy, objectives of the revision, and strategy for the revision. Issues being considered for inclusion in the revision and recommended methods of resolving each issue are also discussed.

  14. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, Matthew; Lachance, Jeff; Sofu, Tanju; Wigeland, Roald; Flanagan, George; Bari, Robert

    2013-01-01

    Conclusions: The Sodium Fast Reactor Safety and Licensing Research Plan reports conclude a multi-year expert elicitation process. All information included in the studies are publicly available and the reports are UUR. These reports are intended to guide SFR researchers in the safety and licensing arena to important and outstanding issues Two (and a half) projects have been funded based on the recommendations in this report: • Modernization of SAS4A; • Incorporation of Contain/LMR with MELCOR; • (Data recovery at INL and PNNL)

  15. Human Factors and Safety Culture in Maritime Safety (revised

    Directory of Open Access Journals (Sweden)

    Heinz Peter Berg

    2013-09-01

    Full Text Available As in every industry at risk, the human and organizational factors constitute the main stakes for maritime safety. Furthermore, several events at sea have been used to develop appropriate risk models. The investigation on maritime accidents is, nowadays, a very important tool to identify the problems related to human factor and can support accident prevention and the improvement of maritime safety. Part of this investigation should in future also be near misses. Operation of ships is full of regulations, instructions and guidelines also addressing human factors and safety culture to enhance safety. However, even though the roots of a safety culture have been established, there are still serious barriers to the breakthrough of the safety management. One of the most common deficiencies in the case of maritime transport is the respective monitoring and documentation usually lacking of adequacy and excellence. Nonetheless, the maritime area can be exemplified from other industries where activities are ongoing to foster and enhance safety culture.

  16. Planning the Marketing Strategy. PACE Revised. Level 3. Unit 6. Research & Development Series No. 240CB6.

    Science.gov (United States)

    Ashmore, M. Catherine; Pritz, Sandra G.

    This individualized, competency-based unit on planning marketing strategy, the sixth of 18 modules, is on the third level of the revised Program for Acquiring Competence in Entrepreneurship (PACE). Intended for the advanced secondary and postsecondary levels and for adults wanting training or retraining, this unit, together with the other…

  17. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  18. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  19. Quarterly report on the Ferrocyanide Safety Program for the period ending June 30, 1995

    International Nuclear Information System (INIS)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1995-07-01

    This is the seventeenth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six pans of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented

  20. DOE Region 6 Radiological Assistance Program plan. Revision 1

    International Nuclear Information System (INIS)

    Jakubowski, F.M.

    1995-11-01

    The US Department of Energy (DOE) has sponsored a Radiological Assistance Program (RAP) since the 1950's. The RAP is designed to make DOE resources available to other DOE facilities, state, tribal, local, private businesses, and individuals for the explicit purpose of assisting during radiological incidents. The DOE has an obligation, through the Atomic Energy Act of 1954, as amended, to provide resources through the Federal Radiological Emergency Response Plan (FRERP, Nov. 1985) in the event of a radiological incident. Toward this end, the RAP program is implemented on a regional basis, and has planned for an incremental response capability with regional coordination between states and DOE response elements. This regional coordination is intended to foster a working relationship between DOE radiological assistance elements and those state, tribal, and local agencies responsible for first response to protect public health and safety

  1. Facility Effluent Monitoring Plan for the Spent Nuclear Fuel (SNF) Project

    International Nuclear Information System (INIS)

    HUNACEK, G.S.

    2000-01-01

    A facility effluent monitoring plan is required by the US. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in Westinghouse Hanford Company (WHC)-EP-0438-1, ''A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans'', and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the third revision to the original annual report. This document is reviewed annually even if there are no operational changes, and it is updated as necessary

  2. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues

    International Nuclear Information System (INIS)

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  3. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''

  4. Planning the Marketing Strategy. PACE Revised. Level 2. Unit 6. Research & Development Series No. 240BB6.

    Science.gov (United States)

    Ashmore, M. Catherine; Pritz, Sandra G.

    This unit on planning marketing strategy for a small business, the sixth in a series of 18 modules, is on the second level of the revised PACE (Program for Acquiring Competence in Entrepreneurship) comprehensive curriculum. Geared to advanced secondary and beginning postsecondary or adult students, the modules provide an opportunity to learn about…

  5. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Krenzien, Susan [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-06-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  6. LMFBR safety experiment facility planning and analysis

    International Nuclear Information System (INIS)

    Stevenson, M.G.; Scott, J.H.

    1976-01-01

    In the past two years considerable effort has been placed on the planning and design of new facilities for the resolution of LMFBR safety issues. The paper reviews the key issues, the experiments needed to resolve them, and the design aspects of proposed new facilities. In addition, it presents a decision theory approach to selecting an optimal combination of modified and new facilities

  7. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  8. 242-A Evaporator waste analysis plan. Revision 4

    International Nuclear Information System (INIS)

    Basra, T.S.; Mulkey, C.H.

    1994-01-01

    This waste analysis plan (WAP) provides the plan for obtaining information needed for proper waste handling and processing in the 242-A Evaporator located on the Hanford Site. Regulatory and safety issues are addressed by establishing boundary conditions for waste received and treated at the 242-A Evaporator. The boundary conditions are set by establishing limits for items such as potential exothermic reactions, waste compatibility, and control of vessel vent organic emissions. Boundary conditions are also set for operational considerations and to ensure waste acceptance at receiving facilities. The issues that are addressed in this plan include prevention of exotherms in the waste, waste compatibility, vessel vent emissions, and compatibility with the liner in the Liquid Effluent Retention Facility (LERF). The 242-A Evaporator feed stream is separated into two liquid streams: a concentrated slurry stream and a process condensate. A gaseous exhaust stream is also produced. The slurry contains the majority of the radionuclides and inorganic constituents. This stream is pumped back to the double shell tanks (DSTs) and stored for further treatment after being concentrated to target levels. The process condensate (PC) is primarily water that contains trace amounts of organic material and a greatly reduced concentration of radionuclides. The process condensate is presently stored in the (LERF) until it can be further processed in the Effluent Treatment Facility once it is operational

  9. Revising superior planning performance in chess players: the impact of time restriction and motivation aspects.

    Science.gov (United States)

    Unterrainer, Josef Martin; Kaller, Christoph Philipp; Leonhart, Rainer; Rahm, Benjamin

    2011-01-01

    In a previous study (Unterrainer, Kaller, Halsband, & Rahm, 2006), chess players outperformed non-chess players in the Tower of London planning task but exhibited disproportionately longer processing times. This pattern of results raises the question of whether chess players' planning capabilities are superior or whether the results reflect differences in the speed-accuracy trade-off between the groups, possibly attributable to sports motivation. The present study was designed to disambiguate these alternative suggestions by implementing various constraints on planning time and by assessing self-reported motivation. In contrast to the previous study, chess players' performance was not superior, independently of whether problems had to be solved with (Experiment 1) or without (Experiment 2) time limits. As expected, chess players reported higher overall trait and state motivation scores across both experiments. These findings revise the notion of superior planning performance in chess players. In consequence, they do not conform with the assumption of a general transfer of chess-related planning expertise to other cognitive domains, instead suggesting that superior performance may be possible only under specific circumstances such as receiving competitive instructions.

  10. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  11. DOE-owned spent nuclear fuel strategic plan. Revision 1

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) is responsible for safely and efficiently managing DOE-owned spent nuclear fuel (SNF) and SNF returned to the US from foreign research reactors (FRR). The fuel will be treated where necessary, packaged suitable for repository disposal where practicable, and placed in interim dry storage. These actions will remove remaining vulnerabilities, make as much spent fuel as possible ready for ultimate disposition, and substantially reduce the cost of continued storage. The goal is to complete these actions in 10 years. This SNF Strategic Plan updates the mission, vision, objectives, and strategies for the management of DOE-owned SNF articulated by the SNF Strategic Plan issued in December 1994. The plan describes the remaining issues facing the EM SNF Program, lays out strategies for addressing these issues, and identifies success criteria by which program progress is measured. The objectives and strategies in this plan are consistent with the following Em principles described by the Assistance Secretary in his June 1996 initiative to establish a 10-year time horizon for achieving most program objectives: eliminate and manage the most serious risks; reduce mortgage and support costs to free up funds for further risk reduction; protect worker health and safety; reduce generation of wastes; create a collaborative relationship between DOE and its regulators and stakeholders; focus technology development on cost and risk reduction; and strengthen management and financial control

  12. Westinghouse Hanford Company plan for certifying newly generated contact -- handled transuranic waste. Revision 1

    International Nuclear Information System (INIS)

    Lipinski, R.M.; Backlund, E.G.

    1995-09-01

    All transuranic (TRU) waste generators are required by US Department of Energy (DOE) Order 5820.2A to package their TRU waste in order to comply wit the Waste Isolation Pilot Plant (WIPP) -- Waste Acceptance Criteria (WAC) or keep non-certifiable containers segregated. The Westinghouse Hanford Company (WHC) Transuranic Waste Certification Plan was developed to ensure that TRU newly generated waste at WHC meets the DOE Order 5820.2A and the WHC-WAC which includes the State of Washington Department of Ecology -- Washington Administrative Code (DOE-WAC). The metho used at WHC to package TRU waste are described in sufficient detail to meet the regulations. This document is organized to provide a brief overview of waste generation operations at WHC. The methods used to implement this plan are discussed briefly along with the responsibilities and authorities of applicable organizations. This plan describes how WHC complies with all applicable regulations and requirements set forth in the latest approved revision of WHC-EP-0063-4

  13. Radiation protection and safety of radiation sources international basic safety standards

    CERN Document Server

    International Atomic Energy Agency. Vienna

    2014-01-01

    The Board of Governors of the IAEA first approved Basic Safety Standards in June 1962; they were published by the IAEA as IAEA Safety Series No. 9. A revised edition was issued in 1967. A third revision was published by the IAEA as the 1982 Edition of IAEA Safety Series No. 9 ; this edition was jointly sponsored by the IAEA, ILO, OECD/NEA and the WHO. The next edition was International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources, published by the IAEA as IAEA Safety Series No. 115 in February 1996, and jointly sponsored by the FAO, IAEA, ILO, OECD/NEA, PAHO and the WHO.

  14. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  15. Revised Fifth Five Year Economic and Social Development Plan, 1984-1986.

    Science.gov (United States)

    1987-01-01

    This document contains provisions of chapter 6 (Promoting Social Development) of the Revised Fifth Five-Year Economic and Social Development Plan (1984-86) of the Republic of Korea. The plan calls for the efficient control of population growth by targeting intensive efforts to women 20-30 years old, eradicating the traditional preference for male children, providing incentives to foster a small family norm, and discouraging couples from having too many children. Family planning (FP) programs will be expanded to increase the contraceptive prevalence rate and improve the quality of contraceptive services. Emphasis will be placed on women 34 years or younger residing in poor urban and remote rural areas. The emphasis of the evaluations of FP guidance and evaluation teams will be on the actual prevention of birth rather than on the contraceptive use ratio, and the FP program will be linked to other health and medical schemes. Families with 2 children or less will receive extended medical services and free kindergarten tuition. Families with 3 or more children may face discriminatory policy measures. The Family Law will be amended to allow daughters to inherit, the Medical Insurance Law will be changed to allow family members dependent upon female workers to be insured, and social institutions hindering female participation in the work force will be banned. The dissemination of FP information and population education will be expanded.

  16. Developing glovebox robotics to meet the national robot safety standard and nuclear safety criteria

    International Nuclear Information System (INIS)

    McMahon, T.T.; Sievers, R.H.

    1991-09-01

    Development of a glove box based robotic system by the Lawrence Livermore National Laboratory (LLNL) is reported. Safety issues addressed include planning to meet the special constraints of operations within a hazardous material glove box and with hostile environments, compliance with the current and draft national robotic system safety standards, and eventual satisfaction of nuclear material handling requirements. Special attention has been required for the revision to the robot and control system models which antedate adoption of the present national safety standard. A robotic test bed, using non-radioactive surrogates is being activated at the Lawrence Livermore National Laboratory to develop the material handling system and the process interfaces for future special nuclear material processing applications. Part of this effort is to define, test, and revise adequate safety controls to ensure success when the system is eventually deployed at a DOE site. The current system is primarily for demonstration and testing, but will evolve into the baseline configuration from which the production system is to be derived. This results in special hazards associated with research activities which may not be present on a production line. Nuclear safety is of paramount importance and has been successfully addressed for 50 years in the DOE weapons production complex. It carries its particular requirements for robot systems and manual operations, as summarized below: Criticality must be avoided (materials cannot consolidate or accumulate to approach a critical mass). Radioactive materials must be confined. The public and workers must be protected from accountable radiation exposure. Nuclear material must be readily retrievable. Nuclear safety must be conclusively demonstrated through hazards analysis. 7 refs

  17. 76 FR 28944 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-19

    ...EPA is proposing a limited approval and limited disapproval of permitting rules submitted for the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). The districts are required under Part D of title I of the Clean Air Act (CAA) to adopt and implement a SIP-approved New Source Review (NSR) permit program. These rules update and revise the District's NSR permitting program for new and modified sources of air pollution. If EPA finalizes the limited approval and limited disapproval action, as proposed, then a sanctions clock would be triggered. We are taking comments on this proposal and plan to follow with a final action.

  18. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  19. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-06

    ...EPA is approving revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on April 26, 2012 and concerns oxides of nitrogen (NOX) from solid fuel fired boilers. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act).

  20. 77 FR 71129 - Revisions to the California State Implementation Plan, San Joaquin Valley United Air Pollution...

    Science.gov (United States)

    2012-11-29

    ...EPA is finalizing approval of revisions to the SJVUAPCD and SCAQMD portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on June 21, 2012 and concerns volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  1. Preclosure Safety Analysis Guide

    International Nuclear Information System (INIS)

    D.D. Orvis

    2003-01-01

    A preclosure safety analysis (PSA) is a required element of the License Application (LA) for the high- level radioactive waste repository at Yucca Mountain. This guide provides analysts and other Yucca Mountain Repository Project (the Project) personnel with standardized methods for developing and documenting the PSA. The definition of the PSA is provided in 10 CFR 63.2, while more specific requirements for the PSA are provided in 10 CFR 63.112, as described in Sections 1.2 and 2. The PSA requirements described in 10 CFR Part 63 were developed as risk-informed performance-based regulations. These requirements must be met for the LA. The PSA addresses the safety of the Geologic Repository Operations Area (GROA) for the preclosure period (the time up to permanent closure) in accordance with the radiological performance objectives of 10 CFR 63.111. Performance objectives for the repository after permanent closure (described in 10 CFR 63.113) are not mentioned in the requirements for the PSA and they are not considered in this guide. The LA will be comprised of two phases: the LA for construction authorization (CA) and the LA amendment to receive and possess (R and P) high-level radioactive waste (HLW). PSA methods must support the safety analyses that will be based on the differing degrees of design detail in the two phases. The methods described herein combine elements of probabilistic risk assessment (PRA) and deterministic analyses that comprise a risk-informed performance-based safety analysis. This revision to the PSA guide was prepared for the following objectives: (1) To correct factual and typographical errors. (2) To provide additional material suggested from reviews by the Project, the U.S. Department of Energy (DOE), and U.S. Nuclear Regulatory Commission (NRC) Staffs. (3) To update material in accordance with approaches and/or strategies adopted by the Project. In addition, a principal objective for the planned revision was to ensure that the methods and

  2. RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  3. 76 FR 55056 - Toy Safety Standard: Strategic Outreach and Education Plan

    Science.gov (United States)

    2011-09-06

    ... to test and certify to the toy safety standard. We plan to use traditional and social media to... testing and certification requirements for children's toys and toy chests and their compliance with ASTM... manufacturers of children's toys must ensure that covered toys are tested for compliance with the toy safety...

  4. 12 CFR 263.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... member bank will take to correct the deficiency and the time within which those steps will be taken. (c... FEDERAL RESERVE SYSTEM RULES OF PRACTICE FOR HEARINGS Submission and Review of Safety and Soundness... safety and soundness compliance plan. (a) Schedule for filing compliance plan—(1) In general. A State...

  5. Selenide isotope generator for the Galileo Mission: safety test plan

    International Nuclear Information System (INIS)

    1979-01-01

    The intent of this safety test plan is to outline particular kinds of safety tests designed to produce information which would be useful in the safety analysis process. The program deals primarily with the response of the RTG to accident environments; accordingly two criteria were established: (1) safety tests should be performed for environments which are the most critical in terms of risk contribution; and (2) tests should be formulated to determine failure conditions for critical heat source components rather than observe heat source response in reference accident environments. To satisfy criterion 1. results of a recent safety study were used to rank various accidents in terms of expected source terms. Six kinds of tests were then proposed which would provide information meeting the second criterion

  6. HSE's safety assessment principles for criticality safety

    International Nuclear Information System (INIS)

    Simister, D N; Finnerty, M D; Warburton, S J; Thomas, E A; Macphail, M R

    2008-01-01

    The Health and Safety Executive (HSE) published its revised Safety Assessment Principles for Nuclear Facilities (SAPs) in December 2006. The SAPs are primarily intended for use by HSE's inspectors when judging the adequacy of safety cases for nuclear facilities. The revised SAPs relate to all aspects of safety in nuclear facilities including the technical discipline of criticality safety. The purpose of this paper is to set out for the benefit of a wider audience some of the thinking behind the final published words and to provide an insight into the development of UK regulatory guidance. The paper notes that it is HSE's intention that the Safety Assessment Principles should be viewed as a reflection of good practice in the context of interpreting primary legislation such as the requirements under site licence conditions for arrangements for producing an adequate safety case and for producing a suitable and sufficient risk assessment under the Ionising Radiations Regulations 1999 (SI1999/3232 www.opsi.gov.uk/si/si1999/uksi_19993232_en.pdf). (memorandum)

  7. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  8. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  9. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Science.gov (United States)

    2013-09-24

    ...EPA is finalizing a limited approval and limited disapproval of two permitting rules submitted by California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on February 22, 2013 and concern construction and modification of stationary sources of air pollution within each District. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA). Final approval of these rules makes the rules federally enforceable and corrects program deficiencies identified in a previous EPA rulemaking (76 FR 44809, July 27, 2011). EPA is also making a technical amendment to the Code of Federal Regulations (CFR) to reflect this previous rulemaking, which removed an obsolete provision from the California SIP.

  10. Development of the methodology for application of revised source term to operating nuclear power plants in Korea

    International Nuclear Information System (INIS)

    Kang, M.S.; Kang, P.; Kang, C.S.; Moon, J.H.

    2004-01-01

    Considering the current trend in applying the revised source term proposed by NUREG-1465 to the nuclear power plants in the U.S., it is expected that the revised source term will be applied to the Korean operating nuclear power plants in the near future, even though the exact time can not be estimated. To meet the future technical demands, it is necessary to prepare the technical system including the related regulatory requirements in advance. In this research, therefore, it is intended to develop the methodology to apply the revised source term to operating nuclear power plants in Korea. Several principles were established to develop the application methodologies. First, it is not necessary to modify the existing regulations about source term (i.e., any back-fitting to operating nuclear plants is not necessary). Second, if the pertinent margin of safety is guaranteed, the revised source term suggested by NUREG-1465 may be useful to full application. Finally, a part of revised source term could be selected to application based on the technical feasibility. As the results of this research, several methodologies to apply the revised source term to the Korean operating nuclear power plants have been developed, which include: 1) the selective (or limited) application to use only some of all the characteristics of the revised source term, such as release timing of fission products and chemical form of radio-iodine and 2) the full application to use all the characteristics of the revised source term. The developed methodologies are actually applied to Ulchin 9 and 4 units and their application feasibilities are reviewed. The results of this research are used as either a manual in establishing the plan and the procedure for applying the revised source term to the domestic nuclear plant from the utility's viewpoint; or a technical basis of revising the related regulations from the regulatory body's viewpoint. The application of revised source term to operating nuclear

  11. Discussion on some issues for HAF003 revision

    International Nuclear Information System (INIS)

    Huang Chaoyun, Wang Xiaotao; Duan Hongwei; Tian Feng

    2013-01-01

    This paper describes some key issues which should be considered during the revision of safety code Quality Assurance for Nuclear Power Plant (HAF003), based on the comparatively analysis and research on the quality assurance practice for nuclear power. It covers about 24 issues including management responsibilities, independent assessment, design control and procurement control etc. and is expected to provide some reference and proposal for HAF003 revision activities organized by National Nuclear Safety Agency (NNSA). (authors)

  12. Safety evaluation report on Tennessee Valley Authority: Watts Bar Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1990-01-01

    This safety evaluation report on the information submitted by the Tennessee Valley Authority in its Nuclear Performance Plan for the Watts Bar Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific corrective actions as part of the recovery program for licensing of Unit 1. The staff will be monitoring and inspecting the implementation of the programs. The plan does not address all licensing matters that will be required for fuel load and operation of Unit 1. Those remaining licensing matters have been addressed in previous safety evaluations or will be addressed in accordance with routing NRC licensing practices. 97 refs

  13. Is it necessary to plan with safety margins for actively scanned proton therapy?

    Science.gov (United States)

    Albertini, F.; Hug, E. B.; Lomax, A. J.

    2011-07-01

    In radiation therapy, a plan is robust if the calculated and the delivered dose are in agreement, even in the case of different uncertainties. The current practice is to use safety margins, expanding the clinical target volume sufficiently enough to account for treatment uncertainties. This, however, might not be ideal for proton therapy and in particular when using intensity modulated proton therapy (IMPT) plans as degradation in the dose conformity could also be found in the middle of the target resulting from misalignments of highly in-field dose gradients. Single field uniform dose (SFUD) and IMPT plans have been calculated for different anatomical sites and the need for margins has been assessed by analyzing plan robustness to set-up and range uncertainties. We found that the use of safety margins is a good way to improve plan robustness for SFUD and IMPT plans with low in-field dose gradients but not necessarily for highly modulated IMPT plans for which only a marginal improvement in plan robustness could be detected through the definition of a planning target volume.

  14. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  15. 12 CFR 570.3 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... compliance plan shall include a description of the steps the savings association will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance... plan. (a) Schedule for filing compliance plan—(1) In general. A savings association shall file a...

  16. Planning and Preparing for Emergency Response to Transport Accidents Involving Radioactive Material. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide provides guidance on various aspects of emergency planning and preparedness for dealing effectively and safely with transport accidents involving radioactive material, including the assignment of responsibilities. It reflects the requirements specified in Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, and those of Safety Series No. 115, International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. Contents: 1. Introduction; 2. Framework for planning and preparing for response to accidents in the transport of radioactive material; 3. Responsibilities for planning and preparing for response to accidents in the transport of radioactive material; 4. Planning for response to accidents in the transport of radioactive material; 5. Preparing for response to accidents in the transport of radioactive material; Appendix I: Features of the transport regulations influencing emergency response to transport accidents; Appendix II: Preliminary emergency response reference matrix; Appendix III: Guide to suitable instrumentation; Appendix IV: Overview of emergency management for a transport accident involving radioactive material; Appendix V: Examples of response to transport accidents; Appendix VI: Example equipment kit for a radiation protection team; Annex I: Example of guidance on emergency response to carriers; Annex II: Emergency response guide.

  17. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues. Supplement 4

    International Nuclear Information System (INIS)

    1994-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. Supplement 3 gives status as of September 30, 1993. This annual report, Supplement 4, presents updated information as of September 30, 1994. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  18. Survey of ANL organization plans for word processors, personal computers, workstations, and associated software. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Fenske, K.R.; Rockwell, V.S.

    1992-08-01

    The Computing and Telecommunications Division (CTD) has compiled this Survey of ANL Organization plans for Word Processors, Personal Computers, Workstations, and Associated Software (ANL/TM, Revision 4) to provide DOE and Argonne with a record of recent growth in the acquisition and use of personal computers, microcomputers, and word processors at ANL. Laboratory planners, service providers, and people involved in office automation may find the Survey useful. It is for internal use only, and any unauthorized use is prohibited. Readers of the Survey should use it as a reference document that (1) documents the plans of each organization for office automation, (2) identifies appropriate planners and other contact people in those organizations and (3) encourages the sharing of this information among those people making plans for organizations and decisions about office automation. The Survey supplements information in both the ANL Statement of Site Strategy for Computing Workstations (ANL/TM 458) and the ANL Site Response for the DOE Information Technology Resources Long-Range Plan (ANL/TM 466).

  19. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  20. Safety analysis report for the Mixed Waste Storage Facility and portable storage units at the Idaho National Engineering Laboratory. Revision 4

    International Nuclear Information System (INIS)

    Peatross, R.

    1997-01-01

    This revision contains Section 2 only which gives a description of the Mixed Waste Storage Facility (MWSF) and its operations. Described are the facility location, services and utilities, process description and operation, and safety support systems. The MWSF serves as a storage and repackaging facility for low-level mixed waste

  1. Update and revision of WHO air quality guidelines for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Younes, M. [WHO European Centre for Environment and Health, Bilthoven (Netherlands). Bilthoven Div.

    1995-12-31

    The WHO Air Quality Guidelines for Europe (AQG), published in 1987, have provided a uniform basis for the development of strategies for the control of air pollution, and have contributed to the maintenance and improvement of public health in several countries. The aim of the guidelines is to provide a basis for protecting public health from adverse effects of air pollutants, and for eliminating or reducing to a minimum, those contaminants that are known or likely to be hazardous to human health and wellbeing. Since the publication of the first edition of the AQG, new scientific data in the fields of air pollution toxicology and epidemiology have accumulated and new developments in risk assessment methodologies have taken place, requiring updating and/or revision of the existing guidelines. This fact was recognized during the preparation of the initial work plan of the European Centre for Environment and Health, and it was recommended that the Centre undertake any necessary amendments and extensions to the Air Quality Guidelines. The updating procedure is being carried out in cooperation with the International Programme on Chemical Safety (IPCS) and the Commission of the European Communities (CEC) and will be implemented through working group meetings which require the preparation of working documents on specific air pollutants or mixtures and a final consultation to discuss the updated document.It was initiated by a Planning Meeting which was organized in January 1993. The purpose of the planning meeting was to set the framework for the updating and revision process, in particular to discuss the scope and purpose, the contents and the format of the revised AQG publication, to define the details of and the time schedule for the updating process and to identify the working groups needed and their way of operation. (author)

  2. Update and revision of WHO air quality guidelines for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Younes, M [WHO European Centre for Environment and Health, Bilthoven (Netherlands). Bilthoven Div.

    1996-12-31

    The WHO Air Quality Guidelines for Europe (AQG), published in 1987, have provided a uniform basis for the development of strategies for the control of air pollution, and have contributed to the maintenance and improvement of public health in several countries. The aim of the guidelines is to provide a basis for protecting public health from adverse effects of air pollutants, and for eliminating or reducing to a minimum, those contaminants that are known or likely to be hazardous to human health and wellbeing. Since the publication of the first edition of the AQG, new scientific data in the fields of air pollution toxicology and epidemiology have accumulated and new developments in risk assessment methodologies have taken place, requiring updating and/or revision of the existing guidelines. This fact was recognized during the preparation of the initial work plan of the European Centre for Environment and Health, and it was recommended that the Centre undertake any necessary amendments and extensions to the Air Quality Guidelines. The updating procedure is being carried out in cooperation with the International Programme on Chemical Safety (IPCS) and the Commission of the European Communities (CEC) and will be implemented through working group meetings which require the preparation of working documents on specific air pollutants or mixtures and a final consultation to discuss the updated document.It was initiated by a Planning Meeting which was organized in January 1993. The purpose of the planning meeting was to set the framework for the updating and revision process, in particular to discuss the scope and purpose, the contents and the format of the revised AQG publication, to define the details of and the time schedule for the updating process and to identify the working groups needed and their way of operation. (author)

  3. Urban planning, traffic planning and traffic safety of pedestrians and cyclists : report presented to the 1979 Road Research Symposium on Safety of Pedestrians and Cyclists, OECD Headquarters, Paris, 14-16 May 1979. Session III: Physical Countermeasures; Subsession III.1: Urban planning and traffic planning.

    NARCIS (Netherlands)

    Wegman, F.C.M.

    1979-01-01

    The traffic safety of pedestrians and cyclists can be improved by means of urban planning and traffic planning, as one of the possibilities. This paper discusses the framework of these measures and activities and also the effects on the field of traffic planning. Chapter I show that it is not

  4. Oak Ridge National Laboratory Environmenal, Safety, and Health Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The 1990 Tiger Team Appraisal of Oak Ridge National Laboratory (ORNL) revealed that neither Martin Marietta Energy Systems, Inc. (Energy Systems) nor ORNL had a strategic plan for Environmental, Safety, and Health (ES ampersand H) activities. There were no detailed plans describing ORNL's mission, objectives, and strategies for ES ampersand H activities. A number of plans do exist that cover various aspects of ES ampersand H. Their scope ranges from multiyear program plans to annual audit schedules to compliance plans to action plans from specific audits. However, there is not a single document that identifies the plans and the objectives they are to address. This document describes the strategic plan for ORNL and provides the linkage among existing plans. It gives a brief description of the organization and management of ES ampersand H activities at ORNL. The plan identifies the general strategies to be taken by ORNL, using the overall guidance from Energy Systems in its corporate ES ampersand H Strategic Plan. It also identifies more detailed plans for implementation of these strategies, where appropriate

  5. Code of practice for conducting radiation work at PINSTECH (revised 1992)

    International Nuclear Information System (INIS)

    Aslam, M.; Atta, M.A.; Orfi, S.D.

    1992-02-01

    The primary objective of this code is to achieve standard of radiation protection and safety set by Pakistan Nuclear Safety and Radiation Protection (PNSRP) ordinance 1984 and PNSRP regulations 1990. Secondary objective remains to make all best efforts to implement latest ICRP recommendations. The revised code of practice sets forth the objective of adequate system radiological safety of radiation workers, environment and general public. The code provides the guidance to persons and authorities who are responsible for the protection of workers and those who are concerned with the planning and management of personnel monitoring services. The procedures set forth in the code are mandatory and in no case should any of them be deviated under normal conditions. All those supervising and performing any kind of radiation work are required to study and adhere to those procedures and shell make all possible efforts to keep the exposure as low as reasonably achievable (ALARA), social and economic factor being taken into account. (author)

  6. IAEA safety glossary. Terminology used in nuclear safety and radiation protection. 2007 ed

    International Nuclear Information System (INIS)

    2007-01-01

    In developing and establishing standards of safety for protecting people and the environment from harmful effects of ionizing radiation and for the safety of facilities and activities that give rise to radiation risks, clear communication on scientific and technical concepts is essential. The principles, requirements and recommendations that are established and explained in the IAEA's safety standards and elaborated upon in other publications must be clearly expressed. To this end, this Safety Glossary defines and explains technical terms used in IAEA safety standards and other safety related publications, and provides information on their usage. The primary purpose of the Safety Glossary is to harmonize terminology and usage in the IAEA safety standards for protecting people and the environment from harmful effects of ionizing radiation, and in their application. Once definitions of terms have been established, they are, in general, intended to be observed in safety standards and other safety related publications and in the work of the IAEA Department of Nuclear Safety and Security generally. The achievement of consistently high quality in its publications contributes to the authority and credibility of the IAEA, and thus to its influence and effectiveness. High quality in publications and documents is achieved not only by review to ensure that the relevant requirements are met, but also by managing their preparation so as to achieve high quality in their drafting. The Safety Glossary provides guidance primarily for the drafters and reviewers of safety standards, including IAEA technical officers and consultants and bodies for the endorsement of safety standards. The Safety Glossary is also a source of information for users of IAEA safety standards and other safety and security related IAEA publications and for other IAEA staff - notably writers, editors, translators, revisers and interpreters. Users of the Safety Glossary, in particular drafters of national

  7. IAEA safety glossary. Terminology used in nuclear safety and radiation protection. 2007 ed

    International Nuclear Information System (INIS)

    2007-06-01

    In developing and establishing standards of safety for protecting people and the environment from harmful effects of ionizing radiation and for the safety of facilities and activities that give rise to radiation risks, clear communication on scientific and technical concepts is essential. The principles, requirements and recommendations that are established and explained in the IAEA's safety standards and elaborated upon in other publications must be clearly expressed. To this end, this Safety Glossary defines and explains technical terms used in IAEA safety standards and other safety related publications, and provides information on their usage. The primary purpose of the Safety Glossary is to harmonize terminology and usage in the IAEA safety standards for protecting people and the environment from harmful effects of ionizing radiation, and in their application. Once definitions of terms have been established, they are, in general, intended to be observed in safety standards and other safety related publications and in the work of the IAEA Department of Nuclear Safety and Security generally. The achievement of consistently high quality in its publications contributes to the authority and credibility of the IAEA, and thus to its influence and effectiveness. High quality in publications and documents is achieved not only by review to ensure that the relevant requirements are met, but also by managing their preparation so as to achieve high quality in their drafting. The Safety Glossary provides guidance primarily for the drafters and reviewers of safety standards, including IAEA technical officers and consultants and bodies for the endorsement of safety standards. The Safety Glossary is also a source of information for users of IAEA safety standards and other safety and security related IAEA publications and for other IAEA staff - notably writers, editors, translators, revisers and interpreters. Users of the Safety Glossary, in particular drafters of national

  8. IAEA safety glossary. Terminology used in nuclear safety and radiation protection. 2007 ed

    International Nuclear Information System (INIS)

    2007-01-01

    In developing and establishing standards of safety for protecting people and the environment from harmful effects of ionizing radiation and for the safety of facilities and activities that give rise to radiation risks, clear communication on scientific and technical concepts is essential. The principles, requirements and recommendations that are established and explained in the IAA's safety standards and elaborated upon in other publications must be clearly expressed. To this end, this Safety Glossary defines and explains technical terms used in IAEA safety standards and other safety related publications, and provides information on their usage. The primary purpose of the Safety Glossary is to harmonize terminology and usage in the IAEA safety standards for protecting people and the environment from harmful effects of ionizing radiation, and in their application. Once definitions of terms have been established, they are, in general, intended to be observed in safety standards and other safety related publications and in the work of the IAEA Department of Nuclear Safety and Security generally. The achievement of consistently high quality in its publications contributes to the authority and credibility of the IAEA, and thus to its influence and effectiveness. High quality in publications and documents is achieved not only by review to ensure that the relevant requirements are met, but also by managing their preparation so as to achieve high quality in their drafting. The Safety Glossary provides guidance primarily for the drafters and reviewers of safety standards, including IAEA technical officers and consultants and bodies for the endorsement of safety standards. The Safety Glossary is also a source of information for users of IAEA safety standards and other safety and security related IAEA publications and for other IAEA staff - notably writers, editors, translators, revisers and interpreters. Users of the Safety Glossary, in particular drafters of national

  9. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  10. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Implementation of modifications was verified and approved through continuous QA and QC involvement (modification team members). · QA and QC engineers performed several observations of the 1008-VA-L and 1002-GH-L modification installation activities in the technological part of the plant. · New or revised plant procedures, applicable to modifications 1008-VA-L and 1002-GH-L, were verified and approved by QA. · QA and QC engineers were involved in review and monitoring of corrective actions implementation through Corrective Action Program. Quality Assurance involvement in plant modification processes (1008-VA-L and 1002-GH-L) has fulfilled its important role and expectations in achieving overall quality goals and to ensure safe and efficient power plant operation. QA program requirements, as presented in Krsko NPP Quality Assurance Plan, were extended to all participants consistent with the importance of their services and scope of supply for nuclear safety. (authors)

  11. Annual plan of research on safety techniques against low level radioactive wastes, FY1994-FY1999

    International Nuclear Information System (INIS)

    1994-01-01

    The safety research on the disposal of low level radioactive waste has been promoted based on the annual plan decided by the committee on radiative waste safety regulation of the Nuclear Safety Commission. Hereafter, the disposal of low level radioactive waste in ocean is never selected. As to the subjects of the safety research which should be carried out for five years from 1994, the necessity, the contents of research, the organs that carry out the research and so on were deliberated, and the results are made into the annual plan, therefore, it is reported. The way of thinking on the safety research, the contents for which efforts should be exerted as the safety research, and the matters to which attention should be paid are shown. As for the annual plan of safety research, the necessity and the outline of the safety research on the disposal in strata, the concrete subjects and their contents, and the necessity and the outline of the safety research on the reuse, the concrete subjects and their contents are reported. The radioactive waste is those produced by the operation of nuclear reactor facilities, those containing TRU nuclides and RI waste. (K.I.)

  12. National nuclear power plant safety research 2011-2014. SAFIR2014 framework plan

    International Nuclear Information System (INIS)

    2010-01-01

    A country utilising nuclear energy is presumed to possess a sufficient infrastructure to cover the education and research in this field, besides the operating organisations of the plants and a regulatory body. The starting point of public nuclear safety research programmes is that they provide the necessary conditions for retaining the knowledge needed for ensuring the continuance of safe and economic use of nuclear power, for development of new know-how and for participation in international cooperation. In fact, the Finnish organisations engaged in research in this sector have been an important resource which the various ministries, the Radiation and Nuclear Safety Authority (STUK) and the power companies have had at their disposal. Ministry of employment and the economy appointed a group to write the Framework Plan of the new programme. This report contains a proposal for the general outline of the programme, entitled as SAFIR2014 (SAfety of Nuclear Power Plants - Finnish National Research Programme). The plan has been made for the period 2011-2014, but it is based on safety challenges identified for a longer time span as well. Olkiluoto 3, the new nuclear power plant unit under construction and new decisions-in-principle have also been taken into account in the plan. The safety challenges set by the existing plants and the new projects, as well as the ensuing research needs do, however, converge to a great extent. The research programme is strongly based on the Chapter 7a of the Finnish Nuclear Energy Act. The construction of new power plant units will increase the need for experts in the field in Finland. At the same time, the retirement of the existing experts is continuing. These factors together will call for more education and training, in which active research activities play a key role. This situation also makes long-term safety research face a great challenge. The Framework Plan aims to define the important research needs related to the safety

  13. Radiation safety analysis and action plans for NSRRC top-up operation

    International Nuclear Information System (INIS)

    Wang, J.-P.; Sheu, R.-J.; Liu, Joseph C.; Chen, C.-R.; Chang, F.-D.; Kao, S.-P.

    2006-01-01

    This paper summarizes the radiation safety analysis and action plans for the upcoming top-up operation at the National Synchrotron Radiation Research Center (NSRRC). Electron beam loss scenarios and consequence of beam lifetime and injection efficiency have been studied. Dose assessment was conducted based on measurement and Monte Carlo simulation results. Radiation safety action plans such as upgrading the shielding of the injection section, enlarging the exclusion zones of the straight section beamlines, installing new interlock system for top-up operation and most importantly improving the injection efficiency have been scheduled. The goal is to keep present dose limit of 2 mSv/y and make top-up operation feasible at normal user's run of year 2006

  14. 78 FR 23677 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-04-22

    ...EPA is finalizing approval of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on January 7, 2013 and concerns local rules that regulate inhalable particulate matter (PM) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and agricultural areas in Imperial County. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  15. System safety program plan for the Isotope Brayton Ground Demonstration System (phase I)

    International Nuclear Information System (INIS)

    1976-01-01

    The safety engineering effort to be undertaken in achieving an acceptable level of safety in the Brayton Isotope Power System (BIPS) development program is discussed. The safety organizational relationships, the methods to be used, the tasks to be completed, and the documentation to be published are described. The plan will be updated periodically as the need arises

  16. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  17. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  18. Quarterly report on the ferrocyanide safety program for the period ending December 31, 1994

    International Nuclear Information System (INIS)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1995-01-01

    This is the fifteenth quarterly report on the progress of active addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented in Section 1.2. More detailed discussions of progress are located in Sections 2.0 through 4.0. 60 refs

  19. Quarterly report on the Ferrocyanide Safety Program for the period ending September 30, 1995

    International Nuclear Information System (INIS)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1995-10-01

    This is the eighteenth quarterly report on the progress of activities addressing the Ferrocyanide Safety Issue associated with Hanford Site high-level radioactive waste tanks. Progress in the Ferrocyanide Safety Program is reviewed, including work addressing the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990). All work activities are described in the revised program plan (DOE 1994b), and this report follows the same format presented there. A summary of the key events occurring this quarter is presented in Section 1.2. More detailed discussions of progress are located in Sections 2.0 through 4.0

  20. Minnesota urban partnership agreement national evaluation : safety data test plan.

    Science.gov (United States)

    2009-11-17

    This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...

  1. Sexual Safety Planning as an HIV Prevention Strategy for Survivors of Domestic Violence.

    Science.gov (United States)

    Foster, Jill; Núñez, Ana; Spencer, Susan; Wolf, Judith; Robertson-James, Candace

    2016-06-01

    Victims of domestic violence (DV) are not only subject to physical and emotional abuse but may also be at increased risk for less recognized dangers from infection with human immunodeficiency virus (HIV) and other sexually transmitted pathogens. Because of the close link between DV and sexual risk, women need to be educated about the consequences of acquiring a life-threatening sexually transmitted infection, risk reduction measures, and how to access appropriate HIV services for diagnosis and treatment. It is therefore critical for DV workers to receive sufficient training about the link between DV and HIV risk so that sexual safety planning can be incorporated into activities with their clients in the same way as physical safety plans. In this article, we discuss how the Many Hands Working Together project provides interactive training for workers in DV and DV-affiliated agencies to increase their knowledge about HIV and teach sexual safety planning skills to achieve HIV risk reduction.

  2. LLNL Site 200 Risk Management Plan

    International Nuclear Information System (INIS)

    Pinkston, D.; Johnson, M.

    2008-01-01

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES and H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES and H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March

  3. Probabilistic safety analysis procedures guide. Sections 1-7 and appendices. Volume 1, Revision 1

    International Nuclear Information System (INIS)

    Bari, R.A.; Buslik, A.J.; Cho, N.Z.

    1985-08-01

    A procedures guide for the performance of probabilistic safety assessment has been prepared for interim use in the Nuclear Regulatory Commission programs. It will be revised as comments are received, and as experience is gained from its use. The probabilistic safety assessment studies performed are intended to produce probabilistic predictive models that can be used and extended by the utilities and by NRC to sharpen the focus of inquiries into a range of issues affecting reactor safety. This first volume of the guide describes the determination of the probability (per year) of core damage resulting from accident initiators internal to the plant (i.e., intrinsic to plant operation) and from loss of off-site electric power. The scope includes human reliability analysis, a determination of the importance of various core damage accident sequences, and an explicit treatment and display of uncertainties for key accident sequences. The second volume deals with the treatment of the so-called external events including seismic disturbances, fires, floods, etc. Ultimately, the guide will be augmented to include the plant-specific analysis of in-plant processes (i.e., containment performance). This guide provides the structure of a probabilistic safety study to be performed, and indicates what products of the study are valuable for regulatory decision making. For internal events, methodology is treated in the guide only to the extent necessary to indicate the range of methods which is acceptable; ample reference is given to alternative methodologies which may be utilized in the performance of the study. For external events, more explicit guidance is given

  4. Health and safety plan for characterization sampling of ETR and MTR facilities

    International Nuclear Information System (INIS)

    Baxter, D.E.

    1994-10-01

    This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational Safety and Health Administration standard, 29 CFR 1910.120. It contains information about the hazards involved in performing the tasks, and the specific actions and equipment that will be used to protect persons working at the site

  5. 78 FR 979 - Petition for Positive Train Control Safety Plan Approval and System Certification of the...

    Science.gov (United States)

    2013-01-07

    ...] Petition for Positive Train Control Safety Plan Approval and System Certification of the Electronic Train... the Federal Railroad Administration (FRA) for Positive Train Control (PTC) Safety Plan (PTCSP) approval and system certification of the Electronic Train Management System (ETMS) as required by 49 U.S.C...

  6. Jefferson Proving Ground, South of the Firing Line Health and Safety Plan, Volume 4

    National Research Council Canada - National Science Library

    1992-01-01

    .... The purpose of this Site Health and Safety Plan (SHSP) is to assign SECD personnel health and safety responsibilities, to prescribe mandatory operating procedures, and to establish personal-protective-equipment (PPE...

  7. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  8. Recent developments in the IAEA safety standards: design and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Saito, Takehiko

    2004-01-01

    The IAEA has been publishing a wide variety of safety standards for nuclear and radiation related facilities and activities since 1978. In 1996, a more rigorously structured approach for the preparation and review of its safety standards was introduced. Currently, based on the approach, revision of most of the standards is in completion or near completion. The latest versions of the Safety Requirements for ''Design'' and ''Operation'' of nuclear power plants were respectively published in 2000. Currently, along with this revision of the Safety Requirements, many Safety Guides have been revised. In order to clarify the complicated revision procedure, an example of the entire revision process for a Safety Guide is provided. Through actual example of the revision process, enormous amount of work involved in the revision work is clearly indicated. The current status of all of the Safety Standards for Design and that for Operation of nuclear power plants are summarized. Summary of other IAEA safety standards currently revised and available related IAEA publications, together with information on the IAEA Web Site from where these documents can be downloaded, is also provided. The standards are reviewed to determine whether revision (or new issue) is necessary in five years following publication. The IAEA safety standards will continue to be updated through comprehensive and structured approach, collaboration of many experts of the world, and reflecting good practices of the world. The IAEA safety standards will serve to provide high level of safety assurance. (author)

  9. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), we are approving local rules that define terms used in other air pollution regulation in these areas and approving a rule rescission that addresses Petroleum Coke Calcining Operations--Oxides of Sulfur.

  10. 76 FR 44809 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-07-27

    ...EPA is finalizing a limited approval and limited disapproval of permitting rules submitted for the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portions of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on May 19, 2011 and concern New Source Review (NSR) permit programs for new and modified major stationary sources of air pollution. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  11. Identification of training and emergency-planning needs through job-safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Veltrie, J.

    1987-01-01

    Training and emergency-planning needs within the photovoltaic industry may be more accurately determined through the performance of detailed job-safety analysis. This paper outlines the four major components of such an analysis, namely operational review, hazards evaluation, personnel review and resources evaluation. It then shows how these may be developed into coherent training and planning recommendations, for both emergency and non-emergency situations.

  12. Technical Review Report for the Model 9975-96 Package Safety Analysis Report for Packaging (S-SARP-G-00003, Revision 0, January 2008)

    International Nuclear Information System (INIS)

    West, M.

    2009-01-01

    This Technical Review Report (TRR) documents the review, performed by the Lawrence Livermore National Laboratory (LLNL) Staff, at the request of the U.S. Department of Energy (DOE), on the Safety Analysis Report for Packaging, Model 9975, Revision 0, dated January 2008 (S-SARP-G-00003, the SARP). The review includes an evaluation of the SARP, with respect to the requirements specified in 10 CFR 71, and in International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1. The Model 9975-96 Package is a 35-gallon drum package design that has evolved from a family of packages designed by DOE contractors at the Savannah River Site. Earlier package designs, i.e., the Model 9965, the Model 9966, the Model 9967, and the Model 9968 Packagings, were originally designed and certified in the early 1980s. In the 1990s, updated package designs that incorporated design features consistent with the then newer safety requirements were proposed. The updated package designs at the time were the Model 9972, the Model 9973, the Model 9974, and the Model 9975 Packagings, respectively. The Model 9975 Package was certified by the Packaging Certification Program, under the Office of Safety Management and Operations. The safety analysis of the Model 9975-85 Packaging is documented in the Safety Analysis Report for Packaging, Model 9975, B(M)F-85, Revision 0, dated December 2003. The Model 9975-85 Package is certified by DOE Certificate of Compliance (CoC) package identification number, USA/9975/B(M)F-85, for the transportation of Type B quantities of uranium metal/oxide, 238 Pu heat sources, plutonium/uranium metals, plutonium/uranium oxides, plutonium composites, plutonium/tantalum composites, 238 Pu oxide/beryllium metal.

  13. Independent Safety Assessment of the TOPAZ-II space nuclear reactor power system (Revised)

    International Nuclear Information System (INIS)

    1993-09-01

    The Independent Safety Assessment described in this study report was performed to assess the safety of the design and launch plans anticipated by the U.S. Department of Defense (DOD) in 1993 for a Russian-built, U.S.-modified, TOPAZ-II space nuclear reactor power system. Its conclusions, and the bases for them, were intended to provide guidance for the U.S. Department of Energy (DOE) management in the event that the DOD requested authorization under section 91b. of the Atomic Energy Act of 1954, as amended, for possession and use (including ground testing and launch) of a nuclear-fueled, modified TOPAZ-II. The scientists and engineers who were engaged to perform this assessment are nationally-known nuclear safety experts in various disciplines. They met with participants in the TOPAZ-II program during the spring and summer of 1993 and produced a report based on their analysis of the proposed TOPAZ-II mission. Their conclusions were confined to the potential impact on public safety and did not include budgetary, reliability, or risk-benefit analyses

  14. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  15. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  16. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  17. Stalking: A Multidimensional Framework for Assessment and Safety Planning.

    Science.gov (United States)

    Logan, T K; Walker, Robert

    2015-09-03

    Despite the high prevalence of stalking and the risk of harm it poses to victims, arrest rates, prosecutions, and convictions for stalking continue to be low in the United States. The overall goal of this article is to introduce a multidimensional framework of stalking that adds to the current literature by (1) providing a conceptual framework consistent with legal elements of many stalking statutes to facilitate assessment, communication, documentation, and safety planning for stalking several victims; (2) introducing a more systematic way of assessing course of conduct and the context of fear in stalking situations in order to increase the understanding of cumulative fear for stalking victims; (3) emphasizing the aspects of stalking harm that go beyond violence and that show how harm from stalking accumulates over time including life sabotage; and (4) discussing 12 risk factors derived from the overall multidimensional framework that can be used to describe the big picture of stalking and to facilitate safety planning for victims. Implications for future research are discussed. © The Author(s) 2015.

  18. Health and Safety Management Plan for the Plutonium Stabilization and Packaging System

    International Nuclear Information System (INIS)

    1996-01-01

    This Health and Safety Management Plan (HSMP) presents safety and health policies and a project health and safety organizational structure designed to minimize potential risks of harm to personnel performing activities associated with Plutonium Stabilization and Packaging System (Pu SPS). The objectives of the Pu SPS are to design, fabricate, install, and startup of a glovebox system for the safe repackaging of plutonium oxides and metals, with a requirement of a 50-year storage period. This HSMP is intended as an initial project health and safety submittal as part of a three phase effort to address health and safety issues related to personnel working the Pu SPS project. Phase 1 includes this HSMP and sets up the basic approach to health and safety on the project and addresses health and safety issues related to the engineering and design effort. Phase 2 will include the Site Specific Construction health and Safety Plan (SSCHSP). Phase 3 will include an additional addendum to this HSMP and address health and safety issues associated with the start up and on-site test phase of the project. This initial submittal of the HSMP is intended to address those activities anticipated to be performed during phase 1 of the project. This HSMP is intended to be a living document which shall be modified as information regarding the individual tasks associated with the project becomes available. These modifications will be in the form of addenda to be submitted prior to the initiation of each phase of the project. For additional work authorized under this project this HSMP will be modified as described in section 1.4

  19. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  20. Guidelines for the review research reactor safety. Reference document for IAEA Integrated Safety Assessment of Research Reactors (INSARR)

    International Nuclear Information System (INIS)

    1997-01-01

    In 1992, the IAEA published new safety standards for research reactors as part of the set of publications considered by its Research Reactor Safety Programme (RRSP). This set also includes publications giving guidance for all safety aspects related to the lifetime of a research reactor. In addition, the IAEA has also revised the Safety Standards for radiation protection. Consequently, it was considered advisable to revise the Integrated Safety Assessment of Research Reactors (INSARR) procedures to incorporate the new requirements and guidance as well as to extend the scope of the safety reviews to currently operating research reactors. The present report is the result of this revision. The purpose of this report is to give guidance on the preparation, execution, reporting and follow-up of safety review mission to research reactors as conducted by the IAEA under its INSARR missions safety service. However, it will also be of assistance to operators and regulators in conducting: (a) ad hoc safety assessments of research reactors to address individual issues such as ageing or safety culture; and (b) other types of safety reviews such as internal and peer reviews and regulatory inspections

  1. Safety in times of crises - the importance of industrial emergency plans

    International Nuclear Information System (INIS)

    Rademacher, H.; Schulten, R.

    1989-01-01

    Technical and organizational precautions cannot always avoid everyday risks such as accidents, fire, explosions, and other critical situations which without appropriate countermeasures can easily develop into emergencies. While in recent years considerable efforts have been going into improving the technical safety of industrial plants particularly susceptible to accidents (e.g. the nuclear and chemical industry), organizational safety seems to have been neglected. An analysis of different accidents reveals human fallibility rather than technical failures to be causing damage in many cases. Industrial emergency plans are considered to be contributing to the improvement of organizational safety. (orig.) [de

  2. The Nordic programme for nuclear safety 1990-1993. Plan for 1993

    International Nuclear Information System (INIS)

    1993-04-01

    In 1993 the fourth Nordic Nuclear Safety Research programme will be concluded with final reports on all of the eighteen projects. Each report will contain the results of the work carried out which has taken four years to complete and, at the same time, give a more general survey of the Northern countries' competence within the fields of emergency readiness in situations of abnormal radiation, radioactive waste and its disposal, radioecology and nuclear reactor safety - accessibility of appropriate information. Some of the reports will be published in the form of reference books or in the form of databases of direct assistance to the authorities. A number of seminars will be held so that the results and professional level of the reports can be discussed. The coordinators' and project leaders' plans for these activities are presented with the the amounts of money that project organizers have asked the Nordic Nuclear Safety Research programme to finance them with. During 1993 the plans for the programme starting in 1994 must be laid, and future researchers, project leaders, involved organizations and sponsors determined. (AB)

  3. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  4. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  5. 77 FR 2643 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2012-01-19

    ...EPA is finalizing a limited approval and limited disapproval of revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on September 6, 2011 and concerns oxides of nitrogen (NOX) emissions from biomass fuel-fired boilers. Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), this action simultaneously approves a local rule that regulates these emission sources and directs California to correct rule deficiencies.

  6. Industrial Fuel Gas Demonstration Plant Program. Task III, Demonstration plant safety, industrial hygiene, and major disaster plan (Deliverable No. 35)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light, Gas and Water at Memphis, Tennessee. The plan encompasses the following areas of concern: Safety Plan Administration, Industrial Health, Industrial Safety, First Aid, Fire Protection (including fire prevention and control), and Control of Safety Related Losses. The primary objective of this plan is to achieve adequate control of all potentially hazardous activities to assure the health and safety of all employees and eliminate lost work time to both the employees and the company. The second objective is to achieve compliance with all Federal, state and local laws, regulations and codes. Some thirty specific safe practice instruction items are included.

  7. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  8. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  9. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site's contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b)

  10. Results on safety research for five years (from fiscal year 1996 to 2000). A field of power reactors

    International Nuclear Information System (INIS)

    2001-10-01

    This safety research carried out by the Japan Nuclear Cycle Development Institute (JNC) for five years ranged from 1996 to 2000 fiscal year, was performed according to the safety research basic plan (from 1996 to 2000 fiscal year) established on March, 1996 (revised again on May, 2000). This report was arranged on a field on power reactors (all subjects on fields of advanced conversion reactor and a subject on power reactor in a field of seismic resistant and probability theoretical safety evaluation) by combining its research results for five years ranged from 1996 to 2000 fiscal year with general outlines on the safety research basic plan. Here were shown outlines on the safety research basic plan, aims and subjects on safety research at a field of power reactors, a list of survey sheets on safety research result, and survey sheets on safety research results. The survey sheets containing research field, title, organization, researcher name, researching period, names of cooperative organization, using facilities, research outline, research results, established contents, application, and research trends, are ranged to 5 items on advanced conversion reactor, 29 items on high breeder reactor, 1 item on seismic resistance, and 5 items on probability theoretical safety evaluation. (G.K.)

  11. 40 CFR Appendix A to Subpart IIIi... - States With Approved State Implementation Plan Revisions Concerning CAIR NOX Ozone Season Opt-in...

    Science.gov (United States)

    2010-07-01

    ... allocation of CAIR NOX Ozone Season allowances to such units under § 97.388(b): Indiana Michigan North Carolina Ohio South Carolina Tennessee 2. The following States have State Implementation Plan revisions... Ozone Season allowances to such units under § 97.388(c): Indiana Michigan North Carolina Ohio South...

  12. Basic plans of atomic energy development and utilization for fiscal 1978

    International Nuclear Information System (INIS)

    1978-01-01

    The Government has promoted the development and utilization of atomic energy as one of the most important measures for energy supplies. In Japan, due to the unrest concerning safety of nuclear power, siting of nuclear power plants is difficult, thereby the nuclear power generation program is delayed. Then, in major research and development projects such as those of uranium enrichment, fast breeder reactors, an advanced thermal reactor and nuclear fusion, while the remarkable results are being accumulated, the practical aspects are in need of positive governmental measures. Under this situation, the long range program of atomic energy development and utilization is being revised. For the fiscal year 1978 (from April, 1978 to March, 1979), based on the revision, the basic plans are presented, first, the basic policy, and second, the practical measures: strengthening of the safety measures; establishment of the nuclear fuel cycle; development of the new types of power reactors; promotion of the basic researches; securing of the people's understanding and cooperation. (Mori, K

  13. Facility effluent monitoring plan for K area spent fuel storage basin

    International Nuclear Information System (INIS)

    Hunacek, G.S.

    1996-01-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400. 1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in WHC-EP-0438-1, A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the second revision to the original annual report. Long-range integrity of the effluent monitoring system shall be ensured with updates of this report whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  14. Quarterly report on Defense Nuclear Facilities Safety Board Recommendation 90-7 for the period ending December 31, 1992

    International Nuclear Information System (INIS)

    Cash, R.J.; Dukelow, G.T.; Forbes, C.J.

    1993-03-01

    This is the seventh quarterly report on the progress of activities addressing safety issues associated with Hanford Site high-level radioactive waste tanks that contain ferrocyanide compounds. In the presence of oxidizing materials, such as nitrates or nitrites, ferrocyanide can be made to explode in the laboratory by heating it to high temperatures [above 285 degrees C (545 degrees F)]. In the mid 1950s approximately 140 metric tons of ferrocyanide were added to 24 underground high-level radioactive waste tanks. An implementation plan (Cash 1991) responding to the Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990) was issued in March 1991 describing the activities that were planned and underway to address each of the six parts of Recommendation 90-7. A revision to the original plan was transmitted to US Department of Energy by Westinghouse Hanford Company in December 1992. Milestones completed this quarter are described in this report. Contents of this report include: Introduction; Defense Nuclear Facilities Safety Board Implementation Plan Task Activities (Defense Nuclear Facilities Safety Board Recommendation for enhanced temperature measurement, Recommendation for continuous temperature monitoring, Recommendation for cover gas monitoring, Recommendation for ferrocyanide waste characterization, Recommendation for chemical reaction studies, and Recommendation for emergency response planning); Schedules; and References. All actions recommended by the Defense Nuclear Facilities Safety Board for emergency planning by Hanford Site emergency preparedness organizations have been completed

  15. Improving food safety in the supply chain: Integrating traceability in production and distribution planning

    DEFF Research Database (Denmark)

    Grunow, Martin; Rong, Aiying; Akkerman, Renzo

    2008-01-01

    on production and distribution planning. Here, we develop a methodology for production and distribution planning in food supply chains which minimizes production and logistics costs and at the same time reduces food safety concerns, limits the size of potential recalls, and satisfies product quality...... with traceability from the viewpoint of information system development and technology development such as radio frequency identification (RFID) and DNA-based techniques. However, traceability and its implications for food safety are thus far not incorporated in the standard operations management literature...

  16. FFTF operations procedures preparation guide. Revision 2

    International Nuclear Information System (INIS)

    1976-12-01

    The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3

  17. Groundwater Monitoring Plan for the Z-Area Saltstone Disposal Facility, Revision 3

    International Nuclear Information System (INIS)

    WELLS, DANIEL

    2005-01-01

    Groundwater monitoring has been conducted at the Z-Area Saltstone Disposal Facility since 1987. At that time, groundwater monitoring was not required by the industrial landfill regulations, but a modest monitoring program was required by the operating permit. At the time of the 1996 permit renewal, it was determined that a more robust monitoring program was needed. The draft permit required new monitoring wells within 25 feet of each active disposal cell. As an alternative, SRS proposed a program based on direct push sampling. This program called for biennial direct push sampling within 25 feet of each waste-containing cell with additional samples being taken in areas where excessive cracking had been observed. The direct push proposal was accepted by The South Carolina Department of Health and Environmental Control (SCDHEC), and was incorporated by reference into the Z-Area Saltstone Industrial Solid Waste Permit, No.025500-1603. The Industrial Solid Waste Landfill Regulations were revised in 1998 and now include specific requirements for groundwater monitoring. SRS's plan for complying with those regulations is discussed below. The plan calls for a return to traditional monitoring with permanent wells. It also proposes a more technically sound monitoring list based on the actual composition of saltstone

  18. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    Science.gov (United States)

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  19. Methods for implementing revisions to emergency operating procedures. Final report

    International Nuclear Information System (INIS)

    Myers, L.B.; Bell, A.J.

    1984-05-01

    In response to the Three Mile Island (TMI) accident, the US Nuclear Regulatory Commission (NRC) has published the TMI Action Plan. The TMI Action Plan Item I.C.1 called for the upgrading of Emergency Operating Procedures (EOPs) at nuclear power plants. The program developed from this Action Plan item has resulted in utility efforts to: (1) revise EOPs; (2) train personnel in the use of the EOPs; and (3) implement the revised EOPs. The NRC supported the study presented in this report to identify factors which influence the effectiveness of training and implementation of revised EOPs. The NRC's major concern was the possible effects of negative transfer of training. The report includes a summary of existing methods for implementing revisions to procedures based on interviews of plant personnel, a review of the training literature applicable to the effect of previously learned procedures on the learning of and performance with revised procedures (i.e., negative transfer) and recommendations of methods and schedules for implementing revised EOPs. While the study found that the concern over negative transfer of training was not as great as anticipated, several recommendations were made. These include: (1) overtraining of operators to reduce the effect of observed negative transfer; and (2) implementation of the revised EOPs as soon as possible after training to minimize the time operators must rely upon the old EOPs after having been trained on the revised EOPs. The results of the study should be useful both to the utilities and the NRC in the development and review of EOP implementation programs

  20. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site