WorldWideScience

Sample records for safety plan quality

  1. Software quality assurance plans for safety-critical software

    International Nuclear Information System (INIS)

    Liddle, P.

    2006-01-01

    Application software is defined as safety-critical if a fault in the software could prevent the system components from performing their nuclear-safety functions. Therefore, for nuclear-safety systems, the AREVA TELEPERM R XS (TXS) system is classified 1E, as defined in the Inst. of Electrical and Electronics Engineers (IEEE) Std 603-1998. The application software is classified as Software Integrity Level (SIL)-4, as defined in IEEE Std 7-4.3.2-2003. The AREVA NP Inc. Software Program Manual (SPM) describes the measures taken to ensure that the TELEPERM XS application software attains a level of quality commensurate with its importance to safety. The manual also describes how TELEPERM XS correctly performs the required safety functions and conforms to established technical and documentation requirements, conventions, rules, and standards. The program manual covers the requirements definition, detailed design, integration, and test phases for the TELEPERM XS application software, and supporting software created by AREVA NP Inc. The SPM is required for all safety-related TELEPERM XS system applications. The program comprises several basic plans and practices: 1. A Software Quality-Assurance Plan (SQAP) that describes the processes necessary to ensure that the software attains a level of quality commensurate with its importance to safety function. 2. A Software Safety Plan (SSP) that identifies the process to reasonably ensure that safety-critical software performs as intended during all abnormal conditions and events, and does not introduce any new hazards that could jeopardize the health and safety of the public. 3. A Software Verification and Validation (V and V) Plan that describes the method of ensuring the software is in accordance with the requirements. 4. A Software Configuration Management Plan (SCMP) that describes the method of maintaining the software in an identifiable state at all times. 5. A Software Operations and Maintenance Plan (SO and MP) that

  2. Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program

    International Nuclear Information System (INIS)

    Walker, S.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the US Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. This document describes the Environment, Safety, Health, and Quality requirements for conducting BWID activities at the Idaho National Engineering Laboratory. Topics discussed in this report, as they apply to BWID operations, include Federal, State of Idaho, and Environmental Protection Agency regulations, Health and Safety Plans, Quality Program Plans, Data Quality Objectives, and training and job hazard analysis. Finally, a discussion is given on CERCLA criteria and System and Performance audits as they apply to the BWID Program

  3. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  4. Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP-1131, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996. This QAPP has been developed specifically for the BCCP. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of decontaminating B-Cell and project related operations within the 324 Building as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations) are covered in the Building 324 QAPP. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping, and HSRCM-1, Hanford Site Radiological Control Manual, The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing, PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to 10 CFR 83 0.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be

  5. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  6. Process safety improvement-Quality and target zero

    Energy Technology Data Exchange (ETDEWEB)

    Van Scyoc, Karl [Det Norske Veritas (U.S.A.) Inc., DNV Energy Solutions, 16340 Park Ten Place, Suite 100, Houston, TX 77084 (United States)], E-mail: karl.van.scyoc@dnv.com

    2008-11-15

    Process safety practitioners have adopted quality management principles in design of process safety management systems with positive effect, yet achieving safety objectives sometimes remain a distant target. Companies regularly apply tools and methods which have roots in quality and productivity improvement. The 'plan, do, check, act' improvement loop, statistical analysis of incidents (non-conformities), and performance trending popularized by Dr. Deming are now commonly used in the context of process safety. Significant advancements in HSE performance are reported after applying methods viewed as fundamental for quality management. In pursuit of continual process safety improvement, the paper examines various quality improvement methods, and explores how methods intended for product quality can be additionally applied to continual improvement of process safety. Methods such as Kaizen, Poke yoke, and TRIZ, while long established for quality improvement, are quite unfamiliar in the process safety arena. These methods are discussed for application in improving both process safety leadership and field work team performance. Practical ways to advance process safety, based on the methods, are given.

  7. Process safety improvement-Quality and target zero

    International Nuclear Information System (INIS)

    Van Scyoc, Karl

    2008-01-01

    Process safety practitioners have adopted quality management principles in design of process safety management systems with positive effect, yet achieving safety objectives sometimes remain a distant target. Companies regularly apply tools and methods which have roots in quality and productivity improvement. The 'plan, do, check, act' improvement loop, statistical analysis of incidents (non-conformities), and performance trending popularized by Dr. Deming are now commonly used in the context of process safety. Significant advancements in HSE performance are reported after applying methods viewed as fundamental for quality management. In pursuit of continual process safety improvement, the paper examines various quality improvement methods, and explores how methods intended for product quality can be additionally applied to continual improvement of process safety. Methods such as Kaizen, Poke yoke, and TRIZ, while long established for quality improvement, are quite unfamiliar in the process safety arena. These methods are discussed for application in improving both process safety leadership and field work team performance. Practical ways to advance process safety, based on the methods, are given

  8. Process safety improvement--quality and target zero.

    Science.gov (United States)

    Van Scyoc, Karl

    2008-11-15

    Process safety practitioners have adopted quality management principles in design of process safety management systems with positive effect, yet achieving safety objectives sometimes remain a distant target. Companies regularly apply tools and methods which have roots in quality and productivity improvement. The "plan, do, check, act" improvement loop, statistical analysis of incidents (non-conformities), and performance trending popularized by Dr. Deming are now commonly used in the context of process safety. Significant advancements in HSE performance are reported after applying methods viewed as fundamental for quality management. In pursuit of continual process safety improvement, the paper examines various quality improvement methods, and explores how methods intended for product quality can be additionally applied to continual improvement of process safety. Methods such as Kaizen, Poke yoke, and TRIZ, while long established for quality improvement, are quite unfamiliar in the process safety arena. These methods are discussed for application in improving both process safety leadership and field work team performance. Practical ways to advance process safety, based on the methods, are given.

  9. Quality-Assurance Program Plan

    International Nuclear Information System (INIS)

    Kettell, R.A.

    1981-05-01

    This Quality Assurance Program Plan (QAPP) is provided to describe the Quality Assurance Program which is applied to the waste management activities conducted by AESD-Nevada Operations at the E-MAD Facility located in Area 25 of the Nevada Test Site. The AESD-Nevada Operations QAPP provides the necessary systematic and administrative controls to assure activities that affect quality, safety, reliability, and maintainability during design, procurement, fabrication, inspection, shipments, tests, and storage are conducted in accordance with established requirements

  10. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  11. Patient Safety and Healthcare Quality

    Directory of Open Access Journals (Sweden)

    Aikaterini Toska

    2012-01-01

    Full Text Available Introduction: Due to a variety of circumstances and world-wide research findings, patient safety andquality care during hospitalization have emerged as major issues. Patient safety deficits may burdenhealth systems as well as allocated resources. The international community has examined severalproposals covering general and systemic aspects in order to improve patient safety; several long-termprograms and strategies have also been implemented promoting the participation of health-relatedagents, and also government agencies and non-governmental organizations.Aim: Those factors that have negative correlations with patient safety and quality healthcare weredetermined; WHO and EU programs as well as the Greek health policy were also reviewed.Method: Local and international literature was reviewed, including EU and WHO official publications,by using the appropriate keywords.Conclusions: International cooperation on patient safety is necessary in order to improvehospitalization and healthcare quality standards. Such incentives depend heavily on establishing worldwideviable and effective health programs and planning. These improvements also require further stepson safe work procedures, environment safety, hazard management, infection control, safe use ofequipment and medication, and sufficient healthcare staff.

  12. ITER safety studies: starting the quality plan code AINA

    International Nuclear Information System (INIS)

    Dies, J.; Rivas, J. C.; Bargallo, E.

    2010-01-01

    This contribution discusses the implementation of the Quality Plan AINA Code 2.0. The work has affected areas such as the life cycle model, the software reliability plan, the design of the equipment or software tools to use, and has finally produced a new code.

  13. Management services, quality assurance, and safety

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    Broad technical and administrative support for the programmatic research and development activities of the Fusion Energy Division is provided by the Management Services Section and by the division's quality assurance (QA) and safety programs. Support is provided through effective communication with division programmatic staff and through the coordination of resources from disciplines outside the division. The QA activity in the division emphasizes the development and documentation of a QA program that conforms to national standards, the review and approval of engineering documents, supplier surveillance, identification and documentation of nonconforming items, audits, and QA assessments/plans. The division's safety activities include a formal safety program, emergency planning activities, and environmental protection services. Efforts devoted to the removal of hazardous wastes from division facilities were expanded during 1986

  14. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  15. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  16. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Nuklearna Elektrarna Krsko (NEK) has undertaken Nuclear Safety Upgrade Projects as a safety improvement driven by the lessons learned from the Fukushima-Daiichi Accident. Among other projects, new modification 1008-VA-L Passive Containment Filtered Vent (PCFV) System has been installed which acts as the last barrier minimizing the release of radioactive material into the environment in case of failure of all safety systems, and to insure containment integrity during beyond design basis accidents (BDBA). In addition, modification 1002-GH-L Severe Accident Hydrogen Control System (PAR) has been implemented to prevent and mitigate the consequences of explosive gas generation (hydrogen and carbon monoxide) in case of reactor core melting. To ensure containment integrity for all design basis accidents (DBA) and BDBA conditions, NEK has eliminated existing safety-related electrical recombiners, replaced them with two safety-related passive autocatalytic recombiners (PARs) and added 20 new PARs designed for the BDBA conditions. Krsko NPP Quality Assurance Plan has been applied to Nuclear Safety Upgrade Projects (PCFV System and PAR System) through the following activities: · Internal audit of modification process was performed. · Supplier audits were performed to evaluate QA program efficiency of the main design organization and engineering organizations. · Evaluation and approval of Suppliers were performed. · QA engineer was involved in the review and approval of 1008-VA-L and 1002-GH-L modification documentation (Conceptual Design Package, Design Modification Package, Installation Package, Field Design Change Request, Problem/Deficiency Report, and Final Documentation Package). · Purchasing documentation for modifications 1008-VA-L and 1002-GH-L (technical specifications, purchase orders) has been verified and approved by QA. · QA and QC engineers were involved in oversight of production and testing of the new 1008-VA-L and 1002-GH-L plant components.

  17. Quality plan for criticality safety calculations at Rocky Flats

    International Nuclear Information System (INIS)

    Pecora, D.

    1978-01-01

    The text of the plan is given, and some of the guidelines followed in writing it are discussed to aid others who may be faced with the same task. The plan is divided into four sections. The Introduction describes the general functions and purpose of the calculational program. The second section, Activities and Responsibilities, lists specific tasks and their purposes and assigns responsibility for performance. The third section references relevant documentation (e.g., ANSI standards), and the final section describes quality plans for specific functions

  18. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  19. The World Health Organization's water safety plan is much more than just an integrated drinking water quality management plan.

    Science.gov (United States)

    Viljoen, F C

    2010-01-01

    South Africa is a country of contrasts with far ranging variations in climate, precipitation rates, cultures, demographics, housing levels, education, wealth and skills levels. These differences have an impact on water services delivery as do expectations, affordability and available resources. Although South Africa has made much progress in supplying drinking water, the same cannot be said regarding water quality throughout the country. A concerted effort is currently underway to correct this situation and as part of this drive, water safety plans (WSP) are promoted. Rand Water, the largest water services provider in South Africa, used the World Health Organization (WHO) WSP framework as a guide for the development of its own WSP which was implemented in 2003. Through the process of implementation, Rand Water found the WHO WSP to be much more than just another integrated quality system.

  20. Large hadron collider (LHC) project quality assurance plan

    Energy Technology Data Exchange (ETDEWEB)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-09-30

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

  1. Large hadron collider (LHC) project quality assurance plan

    International Nuclear Information System (INIS)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-01-01

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4)

  2. 78 FR 61251 - The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and...

    Science.gov (United States)

    2013-10-03

    ...-0030] RIN 2132-AB20; 2132-AB07 The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and the Public Transportation Safety Certification Training Program; Transit... Public Transportation Safety Program (National Safety Program) and the requirements of the new transit...

  3. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  4. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  5. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  6. 29 CFR 1915.502 - Fire safety plan.

    Science.gov (United States)

    2010-07-01

    ... implement a written fire safety plan that covers all the actions that employers and employees must take to ensure employee safety in the event of a fire. (See Appendix A to this subpart for a Model Fire Safety... safety plan for their employees, and this plan must comply with the host employer's fire safety plan. ...

  7. Hanford Tanks Initiative quality assurance implementation plan

    International Nuclear Information System (INIS)

    Huston, J.J.

    1998-01-01

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy's Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing

  8. Environment, safety, health, and quality plan for the TRU- Contaminated Arid Soils Project of the Landfill Stabilization Focus Area Program

    International Nuclear Information System (INIS)

    Watson, L.R.

    1995-06-01

    The Landfill Stabilization Focus Area (LSFA) is a program funded by the US Department of Energy Office of Technology Development. LSFA supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The TRU-Contaminated Arid Soils project is being conducted under the auspices of the LSFA Program. This document describes the Environment, Safety, Health, and Quality requirements for conducting LSFA/Arid Soils activities at the Idaho National Engineering Laboratory. Topics discussed in this report, as they apply to LSFA/Arid Soils operations, include Federal, State of Idaho, and Environmental Protection Agency regulations, Health and Safety Plans, Quality Program, Data Quality Objectives, and training and job hazard analysis. Finally, a discussion is given on CERCLA criteria and system and performance audits as they apply to the LSFA Program

  9. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented

  10. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    2002-05-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  11. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    1999-09-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  12. Quality assurance program plan for the Reactor Research Experiment Programs (RREP)

    International Nuclear Information System (INIS)

    Pipher, D.G.

    1982-05-01

    This document describes the Quality Assurance Program plans which will be applied to tasks on Reactor Research Experiments performed on Sandia National Laboratories' reactors. The program provides for individual project or experiment quality plan development and allows for reasonable plan flexibility and maximum plan visibility. Various controls and requirements in this program plan are considered mandatory on all features which are identified as important to public health and safety (Level I). It is the intent of this document that the Quality Assurance program comprise those elements which will provide adequate assurance that all components, equipment, and systems of the experiments will perform as designed, and hence prevent delays and costs due to rejections or failures

  13. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  14. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  15. Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6

    International Nuclear Information System (INIS)

    Hagan, J.W.

    1994-09-01

    The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ's self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments's communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH ampersand Q division of ICF KH. The ESH ampersand Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH ampersand Q assessments

  16. Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6

    Energy Technology Data Exchange (ETDEWEB)

    Hagan, J.W.

    1994-09-01

    The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ`s self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments`s communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH&Q division of ICF KH. The ESH&Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH&Q assessments.

  17. Maine highway safety plan

    Science.gov (United States)

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  18. Leadership, safety climate, and continuous quality improvement: impact on process quality and patient safety.

    Science.gov (United States)

    McFadden, Kathleen L; Stock, Gregory N; Gowen, Charles R

    2014-10-01

    Successful amelioration of medical errors represents a significant problem in the health care industry. There is a need for greater understanding of the factors that lead to improved process quality and patient safety outcomes in hospitals. We present a research model that shows how transformational leadership, safety climate, and continuous quality improvement (CQI) initiatives are related to objective quality and patient safety outcome measures. The proposed framework is tested using structural equation modeling, based on data collected for 204 hospitals, and supplemented with objective outcome data from the Centers for Medicare and Medicaid Services. The results provide empirical evidence that a safety climate, which is connected to the chief executive officer's transformational leadership style, is related to CQI initiatives, which are linked to improved process quality. A unique finding of this study is that, although CQI initiatives are positively associated with improved process quality, they are also associated with higher hospital-acquired condition rates, a measure of patient safety. Likewise, safety climate is directly related to improved patient safety outcomes. The notion that patient safety climate and CQI initiatives are not interchangeable or universally beneficial is an important contribution to the literature. The results confirm the importance of using CQI to effectively enhance process quality in hospitals, and patient safety climate to improve patient safety outcomes. The overall pattern of findings suggests that simultaneous implementation of CQI initiatives and patient safety climate produces greater combined benefits.

  19. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  20. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  1. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  2. Quality factors quantification/assurance for software related to safety in nuclear power plants

    International Nuclear Information System (INIS)

    Nunez McLeod, J.E.; Rivera, S.S.

    1997-01-01

    Quality assurance plan is needed to guarantee the software quality. The use of such a plan involves activities that should take place all along the life cycle, and which can be evaluated using the so called quality factors. This is due to the fact that the quality itself cannot be measured, but some of its manifestations can be used for this purpose. In the present work, a methodology to quantify a set of quality factors is proposed, for software based systems to be used in safety related areas in nuclear power plants. (author) [es

  3. Food safety assurance systems: Microbiological testing, sampling plans, and microbiological criteria

    NARCIS (Netherlands)

    Zwietering, M.H.; Ross, T.; Gorris, L.G.M.

    2014-01-01

    Microbiological criteria give information about the quality or safety of foods. A key component of a microbiological criterion is the sampling plan. Considering: (1) the generally low level of pathogens that are deemed tolerable in foods, (2) large batch sizes, and (3) potentially substantial

  4. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  5. Chemical Hygiene and Safety Plan

    Energy Technology Data Exchange (ETDEWEB)

    Berkner, K.

    1992-08-01

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through training and the Plan will serve as a the framework and reference guide for that training.

  6. Quality factors in the life cycle of software oriented to safety systems in nuclear power plants

    International Nuclear Information System (INIS)

    Nunez McLeod, J.E.; Rivera, S.S.

    1997-01-01

    The inclusion of software in safety related systems for nuclear power plants, makes it necessary to include the software quality assurance concept. The software quality can be defined as the adjustment degree between the software and the specified requirements and user expectations. To guarantee a certain software quality level it is necessary to make a systematic and planned set of tasks, that constitute a software quality guaranty plan. The application of such a plan involves activities that should be performed all along the software life cycle, and that can be evaluated through the so called quality factors, due to the fact that the quality itself cannot be directly measured, but indirectly as some of it manifestations. In this work, a software life cycle model is proposed, for nuclear power plant safety related systems. A set os software quality factors is also proposed , with its corresponding classification according to the proposed model. (author) [es

  7. Optimizing Quality of Care and Patient Safety in Malaysia: The Current Global Initiatives, Gaps and Suggested Solutions.

    Science.gov (United States)

    Jarrar, Mu'taman; Abdul Rahman, Hamzah; Don, Mohammad Sobri

    2015-10-20

    Demand for health care service has significantly increased, while the quality of healthcare and patient safety has become national and international priorities. This paper aims to identify the gaps and the current initiatives for optimizing the quality of care and patient safety in Malaysia. Review of the current literature. Highly cited articles were used as the basis to retrieve and review the current initiatives for optimizing the quality of care and patient safety. The country health plan of Ministry of Health (MOH) Malaysia and the MOH Malaysia Annual Reports were reviewed. The MOH has set four strategies for optimizing quality and sustaining quality of life. The 10th Malaysia Health Plan promotes the theme "1 Care for 1 Malaysia" in order to sustain the quality of care. Despite of these efforts, the total number of complaints received by the medico-legal section of the MOH Malaysia is increasing. The current global initiatives indicted that quality performance generally belong to three main categories: patient; staffing; and working environment related factors. There is no single intervention for optimizing quality of care to maintain patient safety. Multidimensional efforts and interventions are recommended in order to optimize the quality of care and patient safety in Malaysia.

  8. Optimizing Quality of Care and Patient Safety in Malaysia: The Current Global Initiatives, Gaps and Suggested Solutions

    Science.gov (United States)

    Jarrar, Mu’taman; Rahman, Hamzah Abdul; Don, Mohammad Sobri

    2016-01-01

    Background and Objective: Demand for health care service has significantly increased, while the quality of healthcare and patient safety has become national and international priorities. This paper aims to identify the gaps and the current initiatives for optimizing the quality of care and patient safety in Malaysia. Design: Review of the current literature. Highly cited articles were used as the basis to retrieve and review the current initiatives for optimizing the quality of care and patient safety. The country health plan of Ministry of Health (MOH) Malaysia and the MOH Malaysia Annual Reports were reviewed. Results: The MOH has set four strategies for optimizing quality and sustaining quality of life. The 10th Malaysia Health Plan promotes the theme “1 Care for 1 Malaysia” in order to sustain the quality of care. Despite of these efforts, the total number of complaints received by the medico-legal section of the MOH Malaysia is increasing. The current global initiatives indicted that quality performance generally belong to three main categories: patient; staffing; and working environment related factors. Conclusions: There is no single intervention for optimizing quality of care to maintain patient safety. Multidimensional efforts and interventions are recommended in order to optimize the quality of care and patient safety in Malaysia. PMID:26755459

  9. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  10. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  11. Mixed Waste Integrated Program Quality Assurance requirements plan

    International Nuclear Information System (INIS)

    1994-01-01

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities

  12. Mixed Waste Integrated Program Quality Assurance requirements plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  13. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  14. Improving food safety in the supply chain: Integrating traceability in production and distribution planning

    DEFF Research Database (Denmark)

    Grunow, Martin; Rong, Aiying; Akkerman, Renzo

    2008-01-01

    on production and distribution planning. Here, we develop a methodology for production and distribution planning in food supply chains which minimizes production and logistics costs and at the same time reduces food safety concerns, limits the size of potential recalls, and satisfies product quality...... with traceability from the viewpoint of information system development and technology development such as radio frequency identification (RFID) and DNA-based techniques. However, traceability and its implications for food safety are thus far not incorporated in the standard operations management literature...

  15. Nevada Nuclear Waste Storage Investigations: Quality Assurance Plan

    International Nuclear Information System (INIS)

    1980-08-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) were established by DOE/NV to evaluate the geohydrologic setting and underground rock masses of the Nevada Test Site (NTS) and contiguous areas to determine whether a suitable site exists for constructing a repository for isolating highly radioactive solid wastes. Since the results of these evaluations will impact possible risks to public health and safety, a quality assurance program which conforms to the criteria given in the Code of Federal Regulations is needed to control the quality aspects of the work. This Quality Assurance Plan (QAP) describes the general quality assurance program for the overall NNWSI project under which the quality assurance programs of the individual participating organizations and support contractors are to operate. The details of how each of these groups will meet the criteria will differ among participating organizations and support contractors, and those details are given in the QAPP's listed in Appendix A. It is the purpose of this plan to show the commonality of quality assurance programs in effect within the project and to define how each element fits into the entire picture to give total quality assurance coverage for the NNWSI Project

  16. A task force model for statewide change in nursing education: building quality and safety.

    Science.gov (United States)

    Mundt, Mary H; Clark, Margherita Procaccini; Klemczak, Jeanette Wrona

    2013-01-01

    The purpose of this article was to describe a statewide planning process to transform nursing education in Michigan to improve quality and safety of patient care. A task force model was used to engage diverse partners in issue identification, consensus building, and recommendations. An example of a statewide intervention in nursing education and practice that was executed was the Michigan Quality and Safety in Nursing Education Institute, which was held using an integrated approach to academic-practice partners from all state regions. This paper describes the unique advantage of leadership by the Michigan Chief Nurse Executive, the existence of a nursing strategic plan, and a funding model. An overview of the Task Force on Nursing Education is presented with a focus on the model's 10 process steps and resulting seven recommendations. The Michigan Nurse Education Council was established to implement the recommendations that included quality and safety. Copyright © 2013 Elsevier Inc. All rights reserved.

  17. Quality and safety of nuclear installations: the role of administration, and, nuclear safety and regulatory procedures

    International Nuclear Information System (INIS)

    Queniart, D.

    1979-12-01

    In the first paper the author defines the concepts of safety and quality and describes the means of intervention by the Public Authorities in safety matters of nuclear installations. These include individual authorisations, definition and application of technical rules and surveillance of installations. In the second paper he defines the distinction between radiation protection and safety and presents the legislative and regulatory plan for nuclear safety in France. A central safety service for nuclear installations was created in March 1973 within the Ministry of Industrial and Scientific Development, where, amongst other tasks, it draws up regulatory procedures and organizes inspections of the installations. The main American regulations for light water reactors are outlined and the French regulatory system for different types of reactors discussed

  18. Planning for design quality

    International Nuclear Information System (INIS)

    Marguglio, B.W.

    1977-01-01

    In the nuclear industry and in other high technology industries in which the Government serves as either a customer or a regulator, it is almost always required that the contractor prepare a Quality Program Plan sometimes also referred to as a Quality Program Index. Often, the Quality Program Plan is included as part of the contractor's proposal in response to the Government's or a prime contractor's Request for Proposal. At this stage, the Quality Program Plan serves to demonstrate to the prospective customer the availability of the various quality systems. It provides the customer with a commitment as to the use of these quality systems, thus giving greater assurance that the customer's overall quality and design requirements can be met. The Quality Program Plan is contributing to the salability of the proposal. 1 ref

  19. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    Science.gov (United States)

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior

  20. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  1. Development of Comprehensive Nuclear Safety Regulation Plan for 2007-2011

    International Nuclear Information System (INIS)

    Choi, Young Sung; Kim, Woong Sik; Park, Dong Keuk; Kim, Ho Ki

    2006-01-01

    The Article 8-2 of Atomic Energy Act requires the government to establish Atomic Energy Promotion Plan every five years. It sets out national nuclear energy policies in a systematic and consistent way. The plan presents the goals and basic directions of national nuclear energy policies on the basis of current status and prospects. Both areas of utilization and safety management of nuclear energy are included and various projects and schedules are delineated based on the national policy directions. The safety management area in this plan deals with the overall safety and regulation policy. Its detail projects and schedule should be developed in separate plans by responsible ministries under the mediation of the MOST. As a regulatory authority, MOST is responsible for safety management area and its technical support organization, KINS has developed Comprehensive Nuclear Safety Regulation Plan as an implementation plan of safety area. This paper presents the development process and specific projects contained in the Comprehensive Nuclear Safety Regulation Plan which is under development now

  2. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  3. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  4. Quality assurance and radiation safety in positron emission tomography

    International Nuclear Information System (INIS)

    Kmetyuk, Ya.V.; Radosh, H.V.; Bezshyyko, O.A.; Golinka-Bezshyyko, L.O.; Kadenko, I.M.; Kazinova, O.A.; Nagai, A.O.

    2012-01-01

    Scientific studies, clinical experience and economic analysis have shown that the positron emission tomography (PET) is clinically and cost effective cancer diagnostics method. Combined PET and computed tomography (PET/CT) has proven clinical utility, particularly in the diagnosis, staging or restaging malignant disease and metastases, surgical planning, radiation therapy planning and evaluation of treatment response. The use of PET/CT has grown substantially in the past few years, with an increasing number of hospitals and installations of PET/CT imaging centers each year. In the same time combination of 2 procedures, each of which impart a radiation dose and, as a result, increases the deleterious influence for health, creates additional radiation safety issues. In these conditions the role of quality assurance (QA) and quality control (QC) programs is getting more and more important. We considered main QA and radiation safety requirements for whole PET technology chain from radio-pharmacy facilities to PET/CT scanning and patient release criteria. All these issues were considered and assessed having the example of PET facilities and technology chain of All-Ukrainian Center for Radiosurgery of the Clinical Hospital 'Feofania'

  5. Assessment of water supply system and water quality of Lighvan village using water safety plan

    Directory of Open Access Journals (Sweden)

    Mojtaba Pourakbar

    2015-12-01

    Full Text Available Background: Continuous expansion of potable water pollution sources is one of the main concerns of water suppliers, therefore measures such as water safety plan (WSP, have been taken into account to control these sources of pollution. The aim of this study was to identify probable risks and threatening hazards to drinking water quality in Lighvan village along with assessment of bank filtration of the village. Methods: In the present study all risks and probable hazards were identified and ranked. For each of these cases, practical suggestions for removing or controlling them were given. To assess potable water quality in Lighvan village, sampling was done from different parts of the village and physicochemical parameters were measured. To assess the efficiency of bank filtration system of the village, independent t test was used to compare average values of parameters in river and treated water. Results: One of the probable sources of pollution in this study was domestic wastewater which threatens water quality. The results of this study show that bank filtration efficiency in water supply of the village is acceptable. Conclusion: Although Bank filtration imposes fewer expenses on governments, it provides suitable water for drinking and other uses. However, it should be noted that application of these systems should be done after a thorough study of water pollution level, types of water pollutants, soil properties of the area, soil percolation and system distance from pollutant sources.

  6. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues

    International Nuclear Information System (INIS)

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  7. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  8. [Post-marketing drug safety-risk management plan(RMP)].

    Science.gov (United States)

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  9. OCRWM [Office of Civilian Radioactive Waste Management] Safety Plan

    International Nuclear Information System (INIS)

    1986-12-01

    The OCRWM Safety Plan sets forth management policies and general requirements for the safety of the public and of personnel associated with the Civilian Radioactive Waste Management Program (hereinafter called the ''Program''). It is applicable to all individuals and organizational elements of the Program, including all facilities and activities controlled by the Program pursuant to the Act, and to all phases of the Program. The plan defines the responsibilities assigned by the Director of the OCRWM to the various OCRWM line organizations, and to the contractors and the projects. It discusses the means by which safety policies and requirements will be communicated, and summarizes the applicable DOE Orders, and the procedures for reviewing, reporting, and evaluating safety problems. In addition, the OCRWM Safety Plan addresses DOE Orders applicable to occupational health and safety, worker protection, and public health and safety. OCRWM believes that it has an equally high level of commitment to both public safety and worker safety. The Plan also summarizes applicable NRC criteria and regulations that will be imposed through the formal licensing proceedings. While the Safety Plan sets forth OCRWM policy, it is not intended to be prescriptive in the details of implementation. Each OCRWM program element must develop and control its own set of detailed requirements for the protection of its workers and the public based on the principles set forth herein

  10. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  11. Report on probabilistic safety assessment (PSA) quality assurance in utilization of risk information

    International Nuclear Information System (INIS)

    2006-12-01

    Recently in Japan, introduction of nuclear safety regulations using risk information such as probabilistic safety assessment (PSA) has been considered and utilization of risk information in the rational and practical measures on safety assurance has made a progress to start with the operation or inspection area. The report compiled results of investigation and studies of PSA quality assurance in risk-informed activities in the USA. Relevant regulatory guide and standard review plan as well as issues and recommendations were reviewed for technical adequacy and advancement of probabilistic risk assessment technology in risk-informed decision making. Useful and important information to be referred as issues in PSA quality assurance was identified. (T. Tanaka)

  12. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  13. Quality and safety in radiotherapy

    CERN Document Server

    Pawlicki, Todd

    2010-01-01

    The first text to focus solely on quality and safety in radiotherapy, this work encompasses not only traditional, more technically oriented, quality assurance activities, but also general approaches of quality and safety. It includes contributions from experts both inside and outside the field to present a global view. The task of assuring quality is no longer viewed solely as a technical, equipment-dependent endeavor. Instead, it is now recognized as depending on both the processes and the people delivering the service. Divided into seven broad categories, the text covers: Quality Management

  14. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  15. Water safety plan at the Saharawi refugee camps in Tindouf (Algeria

    Directory of Open Access Journals (Sweden)

    R. García

    2018-01-01

    Full Text Available Since 1975, about 165,000 people from Western Sahara are living as refugees in the Sahara Desert near Tindouf (Algeria. Available water resources come from deep boreholes located up to tens of kilometers away from the settlements of the population, bulk water is treated in reverse osmosis plants and by chlorination systems and, after, distributed through a network of taps and water tankers. Water supply system complexity and extreme conditions force the elaboration of a Water Safety Plan, aiming to guarantee appropriate provision and quality of water. The plan follows a risk assessment methodology and establishes control mechanisms to minimize risk impacts, which are compiled in six action protocols for infrastructures and water quality monitoring. As a novel contribution, the proposed methodology developed in the refugee camps incorporates besides the conventional water quality assessment concepts, the analysis of the volume of supplied water, linked with some water-washed diseases. Since the end of 2014, those protocols have begun to be applied obtaining results that have a positive effect on the life quality of refugees.

  16. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  17. Research on the Evaluation System for Rural Public Safety Planning

    Institute of Scientific and Technical Information of China (English)

    Ming; SUN; Jianxin; YAN

    2014-01-01

    The indicator evaluation system is introduced to the study of rural public safety planning in this article.By researching the current rural public safety planning and environmental carrying capacity,we select some carrying capacity indicators influencing the rural public safety,such as land,population,ecological environment,water resources,infrastructure,economy and society,to establish the environmental carrying capacity indicator system.We standardize the indicators,use gray correlation analysis method to determine the weight of indicators,and make DEA evaluation of the indicator system,to obtain the evaluation results as the basis for decision making in rural safety planning,and provide scientific and quantified technical support for rural public safety planning.

  18. TU-EF-BRD-01: Topics in Quality and Safety Research and Level of Evidence

    Energy Technology Data Exchange (ETDEWEB)

    Pawlicki, T. [UCSD Medical Center (United States)

    2015-06-15

    Research related to quality and safety has been a staple of medical physics academic activities for a long time. From very early on, medical physicists have developed new radiation measurement equipment and analysis techniques, created ever increasingly accurate dose calculation models, and have vastly improved imaging, planning, and delivery techniques. These and other areas of interest have improved the quality and safety of radiotherapy for our patients. With the advent of TG-100, quality and safety is an area that will garner even more research interest in the future. As medical physicists pursue quality and safety research in greater numbers, it is worthwhile to consider what actually constitutes research on quality and safety. For example, should the development of algorithms for real-time EPID-based in-vivo dosimetry be defined as “quality and safety” research? How about the clinical implementation of such as system? Surely the application of failure modes and effects analysis to a clinical process would be considered quality and safety research, but is this type of research that should be included in the medical physics peer-reviewed literature? The answers to such questions are of critical importance to set researchers in a direction that will provide the greatest benefit to our field and the patients we serve. The purpose of this symposium is to consider what constitutes research in the arena of quality and safety and differentiate it from other research directions. The key distinction here is developing the tool itself (e.g. algorithms for EPID dosimetry) vs. studying the impact of the tool with some quantitative metric. Only the latter would I call quality and safety research. Issues of ‘basic’ versus ‘applied’ quality and safety research will be covered as well as how the research results should be structured to provide increasing levels of support that a quality and safety intervention is effective and sustainable. Examples from existing

  19. TU-EF-BRD-04: Summing It Up: The Future of Quality and Safety Research

    Energy Technology Data Exchange (ETDEWEB)

    Ford, E. [University of Washington (United States)

    2015-06-15

    Research related to quality and safety has been a staple of medical physics academic activities for a long time. From very early on, medical physicists have developed new radiation measurement equipment and analysis techniques, created ever increasingly accurate dose calculation models, and have vastly improved imaging, planning, and delivery techniques. These and other areas of interest have improved the quality and safety of radiotherapy for our patients. With the advent of TG-100, quality and safety is an area that will garner even more research interest in the future. As medical physicists pursue quality and safety research in greater numbers, it is worthwhile to consider what actually constitutes research on quality and safety. For example, should the development of algorithms for real-time EPID-based in-vivo dosimetry be defined as “quality and safety” research? How about the clinical implementation of such as system? Surely the application of failure modes and effects analysis to a clinical process would be considered quality and safety research, but is this type of research that should be included in the medical physics peer-reviewed literature? The answers to such questions are of critical importance to set researchers in a direction that will provide the greatest benefit to our field and the patients we serve. The purpose of this symposium is to consider what constitutes research in the arena of quality and safety and differentiate it from other research directions. The key distinction here is developing the tool itself (e.g. algorithms for EPID dosimetry) vs. studying the impact of the tool with some quantitative metric. Only the latter would I call quality and safety research. Issues of ‘basic’ versus ‘applied’ quality and safety research will be covered as well as how the research results should be structured to provide increasing levels of support that a quality and safety intervention is effective and sustainable. Examples from existing

  20. TU-EF-BRD-04: Summing It Up: The Future of Quality and Safety Research

    International Nuclear Information System (INIS)

    Ford, E.

    2015-01-01

    Research related to quality and safety has been a staple of medical physics academic activities for a long time. From very early on, medical physicists have developed new radiation measurement equipment and analysis techniques, created ever increasingly accurate dose calculation models, and have vastly improved imaging, planning, and delivery techniques. These and other areas of interest have improved the quality and safety of radiotherapy for our patients. With the advent of TG-100, quality and safety is an area that will garner even more research interest in the future. As medical physicists pursue quality and safety research in greater numbers, it is worthwhile to consider what actually constitutes research on quality and safety. For example, should the development of algorithms for real-time EPID-based in-vivo dosimetry be defined as “quality and safety” research? How about the clinical implementation of such as system? Surely the application of failure modes and effects analysis to a clinical process would be considered quality and safety research, but is this type of research that should be included in the medical physics peer-reviewed literature? The answers to such questions are of critical importance to set researchers in a direction that will provide the greatest benefit to our field and the patients we serve. The purpose of this symposium is to consider what constitutes research in the arena of quality and safety and differentiate it from other research directions. The key distinction here is developing the tool itself (e.g. algorithms for EPID dosimetry) vs. studying the impact of the tool with some quantitative metric. Only the latter would I call quality and safety research. Issues of ‘basic’ versus ‘applied’ quality and safety research will be covered as well as how the research results should be structured to provide increasing levels of support that a quality and safety intervention is effective and sustainable. Examples from existing

  1. Application of risk assessment in upgrading safety and quality of radiochemical operations

    International Nuclear Information System (INIS)

    Lin, K.H.; Hightower, J.R.; Vaughen, V.C.A.

    1990-01-01

    A Comprehensive Safety Assessment and Upgrade Program (CSAUP) was commenced by the Chemical Technology Division (Chem Tech) at Oak Ridge National Laboratory (ORNL) to achieve excellence in the safety and quality of its operations and condition of its facilities. In the course of conducting CSAUP, a number of issues of concern were identified. The safety risk of these issues has been assessed, and planned actions were prepared for those issues that require corrective actions or improvement/upgrading. The planned actions were evaluated on consideration for the uniqueness of Chem Tech facilities and operations to determine the risks (high, moderate or low) involved by failure to implement the actions. The risk was defined in terms of the frequency and severity of impact. Priority of categorized actions was based on the urgency of the actions. 2 refs., 1 fig., 3 tabs

  2. Guide for reviewing safety analysis reports for packaging: Review of quality assurance requirements

    International Nuclear Information System (INIS)

    Moon, D.W.

    1988-10-01

    This review section describes quality assurance requirements applying to design, purchase, fabrication, handling, shipping, storing, cleaning, assembly, inspection, testing, operation, maintenance, repair, and modification of components of packaging which are important to safety. The design effort, operation's plans, and quality assurance requirements should be integrated to achieve a system in which the independent QA program is not overly stringent and the application of QA requirements is commensurate with safety significance. The reviewer must verify that the applicant's QA section in the SARP contains package-specific QA information required by DOE Orders and federal regulations that demonstrate compliance. 8 refs

  3. Quality plan and configuration management in complex systems

    International Nuclear Information System (INIS)

    Gonzalez Junto, J.; Merchan Teyssiere

    1993-01-01

    Since the Second World War, the philosophy behind the quality systems of industries and service companies has evolved to embrace the whole life cycle of the product, system or service. In this evolution process, quality has become a strategic factor in the survival of entreprises. The first steps in trying to establish quality systems were taken for the armed forces, followed by space, aeronautical and nuclear projects, whose products were more and more complex and sophisticated. These systems were established by means of quality plans or programmes, and their basic objective was to guarantee a high safety level for the user and/or the general population. In later years, the main concern was to reach a determined quality level not only in one phase of the product life, but in the complete life cycle of the final product. Today a new goal is established and pursued: better quality of the product, service or system life cycle at a lower cost. Methods of improving the quality of systems and processes are the subject of numerous initiatives and studies, to better availability and maintainability of complex equipment or installations, with an extended useful life and greater requirements. Experience in the performance of complex projects shows that a higher quality may be obtained through designing a comprehensive quality plan which pays special attention to information management and modifications of the original design. Obtaining a high reliability level for an installation (equipment, systems, etc), increasing its availability and rationalizing its maintenance may be little less than fanciful without a deep knowledge of the installation, of its activities and its current status in day-to-day operation, which shows the importance of truthful information available to operators and corresponding exactly to their needs. In this frame of mind, a quality plan comprising a configuration management system of information and documents constitutes the basic support tool for

  4. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  5. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  6. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  7. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues. Supplement 4

    International Nuclear Information System (INIS)

    1994-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. Supplement 3 gives status as of September 30, 1993. This annual report, Supplement 4, presents updated information as of September 30, 1994. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  8. Safety and health five-year plan, Fiscal years 1995--1999

    International Nuclear Information System (INIS)

    1994-10-01

    This report describes efforts by the Department of Energy (DOE) to size and allocate funding to safety and health activities that protect workers and the public from harm. Although it is well recognized that virtually every aspect of an operation has health and safety implications, this effort is directed at identifying planned efforts specifically directed at health and safety. The initial effort, to compile information for the period covering FY 1994--1998, served two primary needs: (1) to document what was actually taking place in the DOE Complex, from a budget and resource utilization standpoint (how the complex was reacting to the calls for greater protection for workers and the public); and (2) to embark on an effort to utilize forward-looking management plans to allocate resources to meet safety and health needs (to begin to be proactive). It was recognized that it would take several years to achieve full acceptance and implementation of a single, DOE-wide approach toward planning for safety and health, and to develop plans that emphasized the benefits from both risk management and accident prevention strategies. This report, describing safety and health plans and budgets for FY 1995, reflects the increasing acceptance of risk-based strategies in the development of safety and health plans. More operations are using the prioritization methodology recommended for the safety and health planning process, and more operations have begun to review planned expenditures of resources to better assure that resources are allocated to the highest risk reduction activities

  9. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  10. Health and safety plan for operations performed for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  11. 76 FR 32321 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... approve revisions to the Pennsylvania State Implementation Plan (SIP). The revision consists of a change... prior SIP-approved I/M program to change the duration of the timing of quality assurance audits...

  12. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  13. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  14. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  15. Planning and architectural safety considerations in designing nuclear power plants

    International Nuclear Information System (INIS)

    Konsowa, Ahmed A.

    2009-01-01

    To achieve optimum safety and to avoid possible hazards in nuclear power plants, considering architectural design fundamentals and all operating precautions is mandatory. There are some planning and architectural precautions should be considered to achieve a high quality design and construction of nuclear power plant with optimum safety. This paper highlights predicted hazards like fire, terrorism, aircraft crash attacks, adversaries, intruders, and earthquakes, proposing protective actions against these hazards that vary from preventing danger to evacuating and sheltering people in-place. For instance; using safeguards program to protect against sabotage, theft, and diversion. Also, site and building well design focusing on escape pathways, emergency exits, and evacuation zones, and the safety procedures such as; evacuation exercises and sheltering processes according to different emergency classifications. In addition, this paper mentions some important codes and regulations that control nuclear power plants design, and assessment methods that evaluate probable risks. (author)

  16. Quality and Safety Assurance - Priority Task at Nuclear Power Projects Implementation

    International Nuclear Information System (INIS)

    Nenkova, B.; Manchev, B.; Tomov, E.

    2010-01-01

    Quality and safety assurance at implementation of nuclear power engineering projects is important and difficult task for realization. Many problems arise during this process, when many companies from different countries participate, with various kinds of activities and services provided. The scope of activities necessary for quality and safety assurance is therefore quite expanded and diverse. In order to increase the safety and reliability of Kozloduy NPP Plc (KNPP) Units 5 and 6, as well as to bring the units in conformity with the newest international requirements for quality and safety in the field of nuclear energy, a program for their modernization on the basis of different technical studies and assessments was implemented. The Units 5 and 6 Modernization Program of Kozloduy Nuclear Power Plant was composed of 212 modifications aimed to improve the safety, operability, and reliability of the Units. The Program was realized by stages during yearly planned outages since year 2002 to 2007, without additional outages. A major Program Objective was to extend the Units Life Time in at least 15 Years, under a continuous, safe, and reliable operation. The Modernization Program of Units 5 and 6 of the Bulgarian Nuclear Power Plant in Kozloduy was the first and for the time being the only one in the world, program in the field of nuclear power engineering, by which the full scope of recommendations for improvement of the Kozloduy NPP units was applied. The main goal of the National Electric Company, which is the Employer for the construction of new nuclear facility in Bulgaria, is after completion of all activities regarding construction of Belene NPP the plant to meet or exceed the requirements of the respective national and international quality and safety codes and standards, as well as the IAEA guidelines, as they are established. The objective of this report is to describe different aspects of the quality assurance according to the requirements of quality and

  17. 49 CFR 1106.4 - The Safety Integration Plan process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4 Section 1106.4 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS...

  18. Russian Minatom nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  19. Role of nuclear safety research and future plan

    International Nuclear Information System (INIS)

    Kim, W. S.; Lee, J. I.; Kang, S. C.; Park, Y. W.; Lee, J. H.; Kim, M. W.; Lee, C. J.; Park, Y. I.

    2000-01-01

    For promoting and improving nuclear safety research activities, this report gives an insight on the scope of safety research and its role in the safety management of nuclear installations, and suggests measures to adequately utilize the research results through taking an optimized role share among research organizations. Several measures such as cooperative planning of common research areas and proper role assignment, improvement of the interfaces among researchers, and reflection of end-users' opinion in the course of planning and conducting research to promote application of research results are identified. It is expected that the identified measures will contribute to enhancing the efficiency and effectiveness of nuclear safety research, if they are implemented after deliberating with the government and safety research organizations

  20. Implementation of Water Safety Plans (WSPs): A Case Study in the Coastal Area in Semarang City, Indonesia

    Science.gov (United States)

    Budiyono; Ginandjar, P.; Saraswati, L. D.; Pangestuti, D. R.; Martini; Jati, S. P.

    2018-02-01

    An area of 508.28 hectares in North Semarang is flooded by tidal inundation, including Bandarharjo village, which could affect water quality in the area. People in Bandarharjo use safe water from deep groundwater, without disinfection process. More than 90% of water samples in the Bandaharjo village had poor bacteriological quality. The aimed of the research was to describe the implementation of Water Safety Plans (WSPs) program in Bandarharjo village. This was a descriptive study with steps for implementations adopted the guidelines and tools of the World Health Organization. The steps consist of introducing WSPs program, team building, training the team, examination of water safety before risk assessment, risk assessment, minor repair I, examination of water safety risk, minor repair II (after monitoring). Data were analyzed using descriptive methods. WSPs program has been introduced and formed WSPs team, and the training of the team has been conducted. The team was able to conduct risks assessment, planned the activities, examined water quality, conduct minor repair and monitoring at the source, distribution, and households connection. The WSPs program could be implemented in the coastal area in Semarang, however regularly supervision and some adjustment are needed.

  1. 12 CFR 308.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... time within which those steps will be taken. (c) Review of safety and soundness compliance plans... PRACTICE RULES OF PRACTICE AND PROCEDURE Submission and Review of Safety and Soundness Compliance Plans and... compliance plan. (a) Schedule for filing compliance plan—(1) In general. A bank shall file a written safety...

  2. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  3. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  4. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  5. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  6. FOOD QUALITY MANAGEMENT AND SAFETY

    OpenAIRE

    Rizwana Khatoon; Debkumar Chakraborty; R.C. Chandni; Amar Sankar; A.V. Raghu

    2017-01-01

    Food safety system mainly focuses on identifying and preventing hazards that may lead product to deteriorate. The main important of manufacturing practice is a system that ensures that products meet food safety, quality and legal requirements. The hazard analysis and critical control point system, applies to food safety management, uses the approach of controlling critical points in food handling to prevent food safety problems. Besides enhancing food safety, other benefits of applying HACCP ...

  7. Certification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Toffer, H.; Crowe, R.D.; Ades, M.J.

    1990-05-01

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA ampersand PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan's objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations

  8. New Paradigm in Nuclear Safety from Quality Assurance to Safety Management System

    International Nuclear Information System (INIS)

    Lim, Nam-Jin; Park, Chan-Gook; Nam, Ji-Hee; Kim, Kwan-Hyun; Kwon, Hyuk-il; Lee, Young-Gun Lee

    2006-01-01

    The initial concept of Quality Control (QC) controlling the quality of products is now evolving toward the Management System (MS) achieving safety, through Quality Assurance (QA) ensuring the quality of products and Quality Management (QM) managing the quality by a systematic approach. Nuclear safety can be achieved through an integrated MS that ensures the health, environmental, security, quality and economic requirements being considered together with nuclear safety requirements. MS approach is developed through realizing that most of nuclear accidents had occurred not by the malfunction of hardware or equipment, but by the human error. The MS is a set of inter-related or interacting elements (system) that establishes policies and objectives and which enables those objectives to be achieved in an efficient and effective way

  9. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  10. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  11. Sanitation health risk and safety planning in urban residential ...

    African Journals Online (AJOL)

    The aim of this review paper was to determine the best sanitation health risk and safety planning approach for sustainable management of urban environment. This was achieved by reviewing the concept of sanitation safety planning as a tool. The review adopted exploratory research approach and used secondary data ...

  12. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  13. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  14. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  15. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  16. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  17. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  18. Pacific Northwest Laboratory annual report for 1988 to the Assistant Secretary for Environment, Safety, and Health: Part 5, Environment, safety, health, and quality assurance

    International Nuclear Information System (INIS)

    Faust, L.G.; Pennell, W.T.; Selby, J.M.

    1989-02-01

    This document summarizes the research programs now underway at Battelle's Pacific Northwest Laboratory in the areas of environmental safety, health, and quality assurance. Topics include internal irradiation, emergency plans, dose equivalents, risk assessment, dose equivalents, surveys, neutron dosimetry, and radiation accidents

  19. 78 FR 51754 - Request To Modify License by Replacing Security Plan With New Radiation Safety Plan; U.S...

    Science.gov (United States)

    2013-08-21

    ... Replacing Security Plan With New Radiation Safety Plan; U.S. Department of the Army, Jefferson Proving... security plan with a new radiation safety plan. DATES: Submit comments by September 20, 2013. Requests for.... The proposed change is to modify License Condition No. 12 D which refers to the security plan of...

  20. Safety research plan, JFY 2013 edition

    International Nuclear Information System (INIS)

    2013-09-01

    As for the regulatory issues the governments or JNES considered necessary, JNES had updated every year 'safety research plan' in respective research areas necessary for solving the regulatory issues (safety research needs) and was conducting safety research to obtain the results, etc. 'Safety research plan, JFY 2013 Edition' was compiled aiming at promotion of appropriate reflection and flexible application of research achievements for tacking the regulatory issues taking account of importance and urgency dependent on trend of nuclear safety regulations as well as collective management of safety research and safety survey. 5 new research projects were established with 4 unified research projects and 6 terminated research projects. Finally modified safety research areas, subjects and research projects, JFY 2013 Edition were as follows: design review of nuclear power plant (7 subjects and each subject having several research projects totaled 19), control management of nuclear power plant (one subject having 4 research projects), nuclear fuel cycle (2 subjects and each subject having several research projects totaled 4), nuclear fuel cycle backend (2 subjects and each subject having several research projects totaled 5), nuclear emergency preparedness and response (3 subjects and each subject having several research projects totaled 7) and bases of nuclear safety technology (3 subjects and each subject having several research projects totaled 6). Safety reviews consisted of 6 projects in 3 areas extracting the regulatory issues. As for urgent research projects on the basis of the disaster at Fukushima Daiichi NPP accident, 7 research projects in 4 urgent subjects were as follows: examination for new safety regulation (4 research projects generalized in the above research projects), development of newly necessary evaluation methods (one research project generalized in the above research project), evaluation of the validity for the work for convergence at Fukushima

  1. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  2. Sandia software guidelines: Software quality planning

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standard for Software Quality Assurance Plans, this volume identifies procedures to follow in producing a Software Quality Assurance Plan for an organization or a project, and provides an example project SQA plan. 2 figs., 4 tabs.

  3. 2011 John M. Eisenberg Patient Safety and Quality Awards. The effect of a novel Housestaff Quality Council on quality and patient safety. Innovation in patient safety and quality at the local level.

    Science.gov (United States)

    Fleischut, Peter M; Faggiani, Susan L; Evans, Adam S; Brenner, Samantha; Liebowitz, Richard S; Forese, Laura; Kerr, Gregory E; Lazar, Eliot J

    2012-07-01

    In 2008 New York-Presbyterian Hospital (NYP)/Weill Cornell Medical Center, New York City, the largest not-for-profit, nonsectarian hospital in the United States, created and implemented a novel approach--the Housestaff Quality Council (HQC)--to engaging house-staff in quality and patient safety activities. The HQC represented an innovative collaboration between the housestaff, the Department of Anesthesiology, the Division of Quality and Patient Safety, the Office of Graduate Medical Education, and senior leadership. As key managers of patient care, the housestaff sought to become involved in the quality and patient safety decision- and policy-making processes at the hospital. Its members were determined to decrease or minimize adverse events by facilitating multimodal communication, ensuring smart work flow, and measuring outcomes to determine best practices. The HQC, which also included frontline hospital staff or managers from areas such as nursing, pharmacy, and information technology, aligned its initiatives with those of the division of quality and patient safety and embarked on two projects--medication reconciliation and use of the electronic medical record. More than three years later, the resulting improvements have been sustained and three new projects--hand hygiene, central line-associated bloodstream infections, and patient handoffs--have been initiated. The HQC model is highly replicable at other teaching institutions as a complementary approach to their other quality and patient safety initiatives. However, the ability to sustain positive momentum is dependent on the ability of residents to invest time and effort in the face of a demanding residency training schedule and focus on specialty-specific clinical and research activities.

  4. Pacific Northwest Laboratory annual report for 1988 to the Assistant Secretary for Environment, Safety, and Health: Part 5, Environment, safety, health, and quality assurance

    Energy Technology Data Exchange (ETDEWEB)

    Faust, L.G.; Pennell, W.T.; Selby, J.M.

    1989-02-01

    This document summarizes the research programs now underway at Battelle's Pacific Northwest Laboratory in the areas of environmental safety, health, and quality assurance. Topics include internal irradiation, emergency plans, dose equivalents, risk assessment, dose equivalents, surveys, neutron dosimetry, and radiation accidents. (TEM)

  5. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11 Section 244.11 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD...

  6. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  7. Sign up to Safety: developing a safety improvement plan.

    Science.gov (United States)

    Dight, Carol; Peters, Hayley

    2015-04-01

    The Sign up to Safety (SutS) programme was launched in June 2014 by health secretary Jeremy Hunt. It focuses on listening to patients, carers and staff, learning from what they say when things go wrong, and then taking action to improve patient safety. The programme aims to make the NHS the safest healthcare system in the world by creating a culture devoted to continuous learning and improvement (NHS England 2014). Musgrove Park Hospital, part of Taunton and Somerset NHS Foundation Trust, was one of 12 NHS organisations that signed up to the SutS programme, making public its commitment to the national pledges to be 'open and transparent' and to develop a safety improvement plan. This paper describes the development of the strategy.

  8. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  9. Food quality and safety: Consumer perception and demand

    DEFF Research Database (Denmark)

    Grunert, Klaus G.

    2005-01-01

    choice and consumer demand, addressing questions of price perception and the validity of willingness-to-pay measurements. It is concluded that food quality and safety are central issues in today's food economics, though many research questions remain to be addressed. Udgivelsesdato: SEP 1......Research on consumer quality perception is reviewed using the Total Food Quality Model as a structuring device. The relationship between food safety and quality is addressed, and is discussed in the context of research on consumer risk perception. Quality and safety perception is linked to food...

  10. Food quality and safety: Consumer perception and demand

    DEFF Research Database (Denmark)

    Grunert, Klaus G.

    2005-01-01

    Research on consumer quality perception is reviewed using the Total Food Quality Model as a structuring device. The relationship between food safety and quality is addressed, and is discussed in the context of research on consumer risk perception. Quality and safety perception is linked to food...... choice and consumer demand, addressing questions of price perception and the validity of willingness-to-pay measurements. It is concluded that food quality and safety are central issues in today's food economics, though many research questions remain to be addressed. Udgivelsesdato: SEP 1...

  11. Tank farm health and safety plan. Revision 2

    International Nuclear Information System (INIS)

    Mickle, G.D.

    1995-01-01

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, open-quotes Health and Safety Programs for Hazardous Waste Operations;close quotes 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved

  12. Tank farm health and safety plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Mickle, G.D.

    1995-03-29

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, {open_quotes}Health and Safety Programs for Hazardous Waste Operations;{close_quotes} 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved.

  13. Validation and verification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Ades, M.J.; Crowe, R.D.; Toffer, H.

    1991-04-01

    This report discusses a verification and validation (V ampersand V) plan for computer codes used for safety analysis and probabilistic risk assessment calculations. The present plan fulfills the commitments by Westinghouse Savannah River Company (WSRC) to the Department of Energy Savannah River Office (DOE-SRO) to bring the essential safety analysis and probabilistic risk assessment codes in compliance with verification and validation requirements

  14. Nuclear safety: a large scale quality audit of pressurized equipment

    International Nuclear Information System (INIS)

    Faudon, Valerie

    2016-01-01

    This article notably refers to, quotes and comments a hearing organised by the French Public Office for the Assessment Scientific and Technological Choices (OPECST) on the issue of safety of pressurized equipment in nuclear reactors, and which gathered the main concerned actors (Areva, EDF, IRSN, ASN) to have an overview of quality controls in AREVA NP fabrication plants. Two different issues have been addressed: a technical metallurgical issue related to some boiler-making parts, and an issue related to quality assurance. These issues concern different older reactors (Fessenheim for example) as well as new ones (EPR Flamanville). The article indicates the different measures planned, envisaged or already implemented by the concerned actors in order to improve knowledge in the boiler-making industry, and to ensure a better quality

  15. Planning product quality: An example - ornamental plants

    Directory of Open Access Journals (Sweden)

    Kovačević Miodrag

    2003-01-01

    Full Text Available The industry of ornamental plants is a subject of quality planning. The quality plan is a document setting out the specific quality practices in ornamental plants production. That plan introduce organizational structure procedures, processes and resources needed to implement quality in life cycle of product chain. For engineers it represents a new tool.

  16. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  17. [Quality planning of Family Health Units using Quality Function Deployment (QFD)].

    Science.gov (United States)

    Volpato, Luciana Fernandes; Meneghim, Marcelo de Castro; Pereira, Antonio Carlos; Ambrosano, Gláucia Maria Bovi

    2010-08-01

    Quality is an indispensible requirement in the health field, and its pursuit is necessary in order to meet demands by a population that is aware of its rights, as part of the essence of good work relations, and to decrease technological costs. Quality thus involves all parties to the process (users and professionals), and is no longer merely an attribute of the health service. This study aimed to verify the possibility of quality planning in the Family Health Units, using Quality Function Deployment (QFD). QFD plans quality according to user satisfaction, involving staff professionals and identifying new approaches to improve work processes. Development of the array, called the House of Quality, is this method's most important characteristics. The results show a similarity between the quality demanded by users and the quality planned by professionals. The current study showed that QFD is an efficient tool for quality planning in public health services.

  18. 77 FR 42462 - Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval

    Science.gov (United States)

    2012-07-19

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval AGENCY: Occupational Safety and Health Administration (OSHA), Department of...

  19. Health Information Technology in Healthcare Quality and Patient Safety: Literature Review.

    Science.gov (United States)

    Feldman, Sue S; Buchalter, Scott; Hayes, Leslie W

    2018-06-04

    The area of healthcare quality and patient safety is starting to use health information technology to prevent reportable events, identify them before they become issues, and act on events that are thought to be unavoidable. As healthcare organizations begin to explore the use of health information technology in this realm, it is often unclear where fiscal and human efforts should be focused. The purpose of this study was to provide a foundation for understanding where to focus health information technology fiscal and human resources as well as expectations for the use of health information technology in healthcare quality and patient safety. A literature review was conducted to identify peer-reviewed publications reporting on the actual use of health information technology in healthcare quality and patient safety. Inductive thematic analysis with open coding was used to categorize a total of 41 studies. Three pre-set categories were used: prevention, identification, and action. Three additional categories were formed through coding: challenges, outcomes, and location. This study identifies five main categories across seven study settings. A majority of the studies used health IT for identification and prevention of healthcare quality and patient safety issues. In this realm, alerts, clinical decision support, and customized health IT solutions were most often implemented. Implementation, interface design, and culture were most often noted as challenges. This study provides valuable information as organizations determine where they stand to get the most "bang for their buck" relative to health IT for quality and patient safety. Knowing what implementations are being effectivity used by other organizations helps with fiscal and human resource planning as well as managing expectations relative to cost, scope, and outcomes. The findings from this scan of the literature suggest that having organizational champion leaders that can shepherd implementation, impact culture

  20. 12 CFR 30.4 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... steps the bank will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance plans. Within 30 days after receiving a safety and... AND SOUNDNESS STANDARDS § 30.4 Filing of safety and soundness compliance plan. (a) Schedule for filing...

  1. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  2. Patients' perceptions of safety and quality of maternity clinical handover

    Directory of Open Access Journals (Sweden)

    Chin Georgiana SM

    2011-08-01

    Full Text Available Abstract Background Maternity clinical handover serves to address the gaps in knowledge existing when transitions between individuals or groups of clinicians occur throughout the antenatal, intra-partum and postnatal period. There are limited published studies on maternity handover and a paucity of information about patients' perceptions of the same. This paper reports postnatal patients' perceptions of how maternity handover contributes to the quality and safety of maternity care. Methods This paper reports on a mixed-methods study consisting of qualitative interviews and quantitative medical record analysis. Thirty English-speaking postnatal patients who gave birth at an Australian tertiary maternity hospital participated in a semi-structured interview prior to discharge from hospital. Interview data were coded thematically using the constant comparative method and managed via NVivo software; this data set was supplemented by medical record data analysed using STATA. Results Almost half of the women were aware of a handover process. Clinician awareness of patient information was seen as evidence that handover had taken place and was seen as representing positive aspects of teamwork, care and communication by participants, all important factors in the perception of quality health care. Collaborative cross-checking, including the use of cognitive artefacts such as hand held antenatal records and patient-authored birth plans, and the involvement of patients and their support people in handover were behaviours described by participants to be protective mechanisms that enhanced quality and safety of care. These human factors also facilitated team situational awareness (TSA, shared decision making and patient motivation in labour. Conclusions This study illustrates that many patients are aware of handover processes. For some patients, evidence of handover, through clinician awareness of information, represented positive aspects of teamwork, care and

  3. A plan quality classifier derived with overlap-wall-histogram of hollow organs for automatic IMRT plan quality control of prostate cancer cases

    Directory of Open Access Journals (Sweden)

    Ting Song

    2014-03-01

    Full Text Available Purpose: We developed a plan quality classification model to assess IMRT plan quality of prostate cancer patients for automatic plan quality control. Methods: For hollow organs such as rectum and bladder, dose-wall-histogram (DWH was used to evaluate OAR dose sparing in our institution. Correspondingly, we proposed a new descriptor called overlap-wall-histogram (OWH to describe the complex spatial relationship between PTV and a hollow organ. Two metrics calculated from the OWH and DWH are introduced to quantitatively evaluate the difficulty of patient geometry for planning and plan quality in terms of OAR sparing, respectively. A linear correlation between these two metrics was observed after plotting plan quality metric as a function of geometry difficulty metric studied from a database of prostate cases treated in our institution with acceptable plan quality. Thus, a fitting line was built acting as the boundary of high quality and poor quality plans. A query plan falling above the boundary is assessed as high quality, vice versa poor quality. Results: 15 prostate IMRT plans were used to test our model. One was identified as poor quality and the others were common-level. After re-planning all plans, the dose constraints for bladder wall W75 (percentage of wall receiving more than 75Gy, W70, W65 and W60 can be reduced by 3.34%, 3%, 6.99%, 6.54% for that poor quality plan and 1.11%, 0.95%, 1.45% and 1.81% averagely for the common-level quality group, without sacrificing PTV coverage and rectum dose sparing. Conclusion: An effective model was built to provide automatic IMRT plan quality control by evaluating hollow OAR dose sparing for prostate cancer patients. Furthermore, for the query plan with poor quality, potential improvement of plan quality can be estimated and a good reference plan with similar or harder geometry can be automatically chosen from our database to help guide the re-planning if necessary.---------------------------Cite this

  4. A strategic approach to quality improvement and patient safety education and resident integration in a general surgery residency.

    Science.gov (United States)

    O'Heron, Colette T; Jarman, Benjamin T

    2014-01-01

    To outline a structured approach for general surgery resident integration into institutional quality improvement and patient safety education and development. A strategic plan to address Accreditation Council for Graduate Medical Education (ACGME) Clinical Learning Environment Review assessments for resident integration into Quality Improvement and Patient Safety initiatives is described. Gundersen Lutheran Medical Foundation is an independent academic medical center graduating three categorical residents per year within an integrated multi-specialty health system serving 19 counties over 3 states. The quality improvement and patient safety education program includes a formal lecture series, online didactic sessions, mandatory quality improvement or patient safety projects, institutional committee membership, an opportunity to serve as a designated American College of Surgeons National Surgical Quality Improvement Project and Quality in Training representative, mandatory morbidity and mortality conference attendance and clinical electives in rural surgery and international settings. Structured education regarding and participation in quality improvement and patient safety programs are able to be accomplished during general surgery residency. The long-term outcomes and benefits of these strategies are unknown at this time and will be difficult to measure with objective data. © 2013 Published by Association of Program Directors in Surgery on behalf of Association of Program Directors in Surgery.

  5. Inspection and test planning

    International Nuclear Information System (INIS)

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  6. Yearly plan of safety research on environmental radioactivity for 1996 - 2000

    International Nuclear Information System (INIS)

    1996-01-01

    'Yearly Plan of Safety Research on Environmental Radioactivity' proposed from the special meeting for safety research of environmental radioactivity on December 14, 1995 was investigated by Nuclear Safety Commission. And the safety research of environmental radioactivity in Japan was decided to be pursued according to the plan. The contents of this plan consisted of the purpose and the contents of research as well as the research period and the facilities to be done for each theme. The following themes were included; 1) study on environment·radiation dose and study on radiation exposure reduction. 2) study on biological effects of radiation. 3) study on internal exposure by specified nuclides. 4) study on medical measures for acute radiation exposure. 5) study on assessment of nuclear safety. 6) investigation on radioactivities released from various nuclear facilities in Japan to demonstrate their safety. (M.N.)

  7. 7 CFR 634.23 - Water quality plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  8. Quality Assurance/Quality Control Issues for Intraoperative Planning and Adaptive Repeat Planning of Image-Guided Prostate Implants

    International Nuclear Information System (INIS)

    Zaider, Marco; Cohen, Gilad; Meli, Jerome; Rosenfeld, Anatoly B.

    2008-01-01

    The quality assurance/quality control purpose is this. We design a treatment plan, and we wish to be as certain as reasonably possible that the treatment is delivered as planned. In the case of conventionally planned prostate brachytherapy, implementing to the letter the implantation plan is rarely attainable and therefore can require adaptive replanning (a quality control issue). The reasons for this state of affairs include changes in the prostate shape and volume during implantation and treatment delivery (e.g., edema resolution) and unavoidable inaccuracy in the placement of the seeds in the prostate. As a result, quality-control activities (e.g., the need to monitor-ideally, on the fly-the target and urethral and rectal dosage) must be also addressed

  9. Committee on the safety of nuclear installations - Operating plan (2006 - 2009)

    International Nuclear Information System (INIS)

    2007-01-01

    In 2004, NEA issued its Strategic Plan covering the period 2005-2009, addressing the NEA activities associated with nuclear safety and regulation. Committee on the Safety of Nuclear Installations (CSNI) and Committee on Nuclear Regulatory Activities (CNRA), which have the primary responsibility for activities in this area, have developed and issued a joint strategic plan covering this same time period. As requested in the Joint Strategic Plan, each committee is to prepare an operating plan which describes in more detail the committee's organisation, planned activities, priorities and operating procedures to be used to implement the Joint Strategic Plan. In effect, the Joint Strategic Plan defines what type of work CSNI should do, whereas the Operating Plan describes the overall work scope and how to accomplish it to meet the joint CSNI/CNRA Strategic Plan objectives and mission. The present Operating Plan follows and takes into account the outcome of a CSNI assessment group, which has evaluated the CSNI activities. The assessment group expressed appreciation for the CSNI role and activity, while making recommendations with regards to scope of work and way to operate in order to further improve efficiency. The main objectives of CSNI are to: - Keep all member countries involved in and abreast of developments in safety technology. - Review operating experience with the objective to identify safety issues that need to be addressed by new research. - Review the state-of-knowledge on selected topics of nuclear safety technology and safety assessment. - Promote training and research projects that serve to maintain competence in nuclear safety matters. - Promote research as needed to reach consensus on nuclear safety issues of common interest. - Consider the safety implications of scientific and technical developments. To accomplish these objectives, CSNI is organised into six permanent working groups (as described in Section II), each covering a different set of

  10. Study on European Nuclear Safety Practices during Planned Outages at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2001-12-01

    The present project was aimed at providing: a description of the current status of nuclear safety practices during planned outages at nuclear power plants followed in Europe; the criteria for the safety analysis of future reactors at the design stage; proposing a set of recommendations on good practices and criteria leading to the improvement of nuclear safety during those conditions. The work was organised in 3 phases: Collecting data on current practices; Analysis of questionnaire answers and drawing up of safety good practices references and recommendations; Collecting relevant ideas related to the future reactors at design stage (European Pressurised Water Reactor, European Passive Plant project, European Utilities Requirements and Utilities Requirement Document project). The key element of the performed work was the detailed questionnaire, based on bibliographical review, expert experience and outage practices available in the working team. Different safety areas and activities were covered: outage context; nuclear safety; outage strategy, organisation and control; operating feedback; use of Probabilistic Safety Assessment. The questionnaire was answered by 12 European nuclear power plants, representing 9 different European countries and three different types of reactors (Pressurised Water Reactor, Boiling Water Reactor and Water Water Energy Reactor). Conclusions were drawn under the following headers: Organisational survey and generalities Organisational effectiveness Quality of maintenance Quality of operation Engineering support, management of modification Specific aspects Each analysed subject includes the following topics: Questions background with a summary and the aim of the questions. Current status, that describes common practices, as derived from the answers to the questionnaire, and some examples of good specific practices. Identified good practices. (author)

  11. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  12. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Science.gov (United States)

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  13. Environmental, Safety, and Health Plan for the remedial investigation/feasibility study at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-05-01

    This Environmental, Safety, and Health (ES ampersand H) Plan presents the concepts and methodologies to be followed during the remedial investigation/feasibility study (RI/FS) for Oak Ridge National Laboratory (ORNL) to protect the health and safety of employees, the public, and the environment. This ES ampersand H Plan acts as a management extension for ORNL and Martin Marietta Energy Systems, Inc. (Energy Systems) to direct and control implementation of the project ES ampersand H program. The subsections that follow describe the program philosophy, requirements, quality assurance measures, and methods for applying the ES ampersand H program to individual waste area grouping (WAG) remedial investigations. Hazardous work permits (HWPs) will be used to provide task-specific health and safety requirements

  14. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  15. Model quality and safety studies

    DEFF Research Database (Denmark)

    Petersen, K.E.

    1997-01-01

    The paper describes the EC initiative on model quality assessment and emphasizes some of the problems encountered in the selection of data from field tests used in the evaluation process. Further, it discusses the impact of model uncertainties in safety studies of industrial plants. The model...... that most of these have never been through a procedure of evaluation, but nonetheless are used to assist in making decisions that may directly affect the safety of the public and the environment. As a major funder of European research on major industrial hazards, DGXII is conscious of the importance......-tain model is appropriate for use in solving a given problem. Further, the findings from the REDIPHEM project related to dense gas dispersion will be highlighted. Finally, the paper will discuss the need for model quality assessment in safety studies....

  16. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  17. IAEA code and safety guides on quality assurance

    International Nuclear Information System (INIS)

    Raisic, N.

    1980-01-01

    In the framework of its programme in safety standards development, the IAEA has recently published a Code of Practice on Quality Assurance for Safety in Nuclear Power Plants. The Code establishes minimum requirements for quality assurance which Member States should use in the context of their own nuclear safety requirements. A series of 10 Safety Guides which describe acceptable methods of implementing the requirements of specific sections of the Code are in preparation. (orig.)

  18. Quality and Safety as a Core Leadership Competency.

    Science.gov (United States)

    Bleich, Michael R

    2018-05-01

    A leader's toolbox of competencies comprises knowledge, skills, and abilities in clinical care, finance, human resource management, and more. As essential as these are, a strong command of quality and safety competencies is sovereign in leading and managing, ensuring an optimal patient experience. Four core areas of quality and safety competencies are presented: systems science, knowledge workers, implementation science and big data, and quality safety tools and techniques. J Contin Educ Nurs. 2018;49(5):200-202. Copyright 2018, SLACK Incorporated.

  19. Implementing 10 CFR 830 at the FEMP Silos: Nuclear Health and Safety Plans as Documented Safety Analysis

    International Nuclear Information System (INIS)

    Fisk, Patricia; Rutherford, Lavon

    2003-01-01

    The objective of the Silos Project at the Fernald Closure Project (FCP) is to safely remediate high-grade uranium ore residues (Silos 1 and 2) and metal oxide residues (Silo 3). The evolution of Documented Safety Analyses (DSAs) for these facilities has reflected the changes in remediation processes. The final stage in silos DSAs is an interpretation of 10 CFR 830 Safe Harbor Requirements that combines a Health and Safety Plan with nuclear safety requirements. This paper will address the development of a Nuclear Health and Safety Plan, or N-HASP

  20. Software Quality Assurance for Nuclear Safety Systems

    International Nuclear Information System (INIS)

    Sparkman, D R; Lagdon, R

    2004-01-01

    The US Department of Energy has undertaken an initiative to improve the quality of software used to design and operate their nuclear facilities across the United States. One aspect of this initiative is to revise or create new directives and guides associated with quality practices for the safety software in its nuclear facilities. Safety software includes the safety structures, systems, and components software and firmware, support software and design and analysis software used to ensure the safety of the facility. DOE nuclear facilities are unique when compared to commercial nuclear or other industrial activities in terms of the types and quantities of hazards that must be controlled to protect workers, public and the environment. Because of these differences, DOE must develop an approach to software quality assurance that ensures appropriate risk mitigation by developing a framework of requirements that accomplishes the following goals: (sm b ullet) Ensures the software processes developed to address nuclear safety in design, operation, construction and maintenance of its facilities are safe (sm b ullet) Considers the larger system that uses the software and its impacts (sm b ullet) Ensures that the software failures do not create unsafe conditions Software designers for nuclear systems and processes must reduce risks in software applications by incorporating processes that recognize, detect, and mitigate software failure in safety related systems. It must also ensure that fail safe modes and component testing are incorporated into software design. For nuclear facilities, the consideration of risk is not necessarily sufficient to ensure safety. Systematic evaluation, independent verification and system safety analysis must be considered for software design, implementation, and operation. The software industry primarily uses risk analysis to determine the appropriate level of rigor applied to software practices. This risk-based approach distinguishes safety

  1. 76 FR 32333 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania for the purpose of changing the...). Specifically, the Commonwealth is amending a provision of its prior SIP-approved I/M program to amend the...

  2. Overview of IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Monti, Stefano

    2012-01-01

    The IAEA Action Plan represents a work programme to strengthen and improve nuclear safety world wide. The plan identifies actions for Member States and the IAEA. Success depends upon: • Cooperation between IAEA, Member States, and other stakeholders; • Availability of appropriate financial resources (MS voluntary contributions)

  3. Implementation of Programmatic Quality and the Impact on Safety

    Science.gov (United States)

    Huls, Dale Thomas; Meehan, Kevin

    2005-01-01

    The purpose of this paper is to discuss the implementation of a programmatic quality assurance discipline within the International Space Station Program and the resulting impact on safety. NASA culture has continued to stress safety at the expense of quality when both are extremely important and both can equally influence the success or failure of a Program or Mission. Although safety was heavily criticized in the media after Colimbiaa, strong case can be made that it was the failure of quality processes and quality assurance in all processes that eventually led to the Columbia accident. Consequently, it is possible to have good quality processes without safety, but it is impossible to have good safety processes without quality. The ISS Program quality assurance function was analyzed as representative of the long-term manned missions that are consistent with the President s Vision for Space Exploration. Background topics are as follows: The quality assurance organizational structure within the ISS Program and the interrelationships between various internal and external organizations. ISS Program quality roles and responsibilities with respect to internal Program Offices and other external organizations such as the Shuttle Program, JSC Directorates, NASA Headquarters, NASA Contractors, other NASA Centers, and International Partner/participants will be addressed. A detailed analysis of implemented quality assurance responsibilities and functions with respect to NASA Headquarters, the JSC S&MA Directorate, and the ISS Program will be presented. Discussions topics are as follows: A comparison of quality and safety resources in terms of staffing, training, experience, and certifications. A benchmark assessment of the lessons learned from the Columbia Accident Investigation (CAB) Report (and follow-up reports and assessments), NASA Benchmarking, and traditional quality assurance activities against ISS quality procedures and practices. The lack of a coherent operational

  4. Bronson Methodist Hospital: journey to excellence in quality and safety.

    Science.gov (United States)

    Knapp, Cheryl

    2006-10-01

    Bronson Healthcare Group, a 343-bed not-for-profit health care system serving all of southwest Michigan and northern Indiana, has as its flagship Bronson Methodist Hospital, the recipient of the 2005 Malcolm Baldrige National Quality Award. The Baldrige criteria were used to formalize Bronson's approach to performance excellence. The strategic plan is condensed and communicated via a "Plan for Excellence" focused on three strategies: clinical excellence, customer and service excellence, and corporate effectiveness. Initiatives include clinical scene investigation (a system for reporting and investigating sentinel and atypical events), a strategy for educating staff in the Situation-Background-Assessment-Recommendations (SBAR) communication technique, and mandatory influenza immunization for health care staff (safety), patient health literacy needs and a health information center (patient centeredness); methods to reduce bloodstream and ventilator-acquired pneumonia infections (effectiveness); a physician portal for access to forms, test results, and patient information (efficiency); restaurant-style pagers for patients and families while waiting (timeliness); and community outreach (equity). Bronson's journey to excellence continues with more accountability for hand-off communication and teamwork, enhancing a non-punitive environment for patient safety reporting, and further incorporating patient and family involvement.

  5. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    Science.gov (United States)

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  6. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  7. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  8. Improving patient safety through quality assurance.

    Science.gov (United States)

    Raab, Stephen S

    2006-05-01

    Anatomic pathology laboratories use several quality assurance tools to detect errors and to improve patient safety. To review some of the anatomic pathology laboratory patient safety quality assurance practices. Different standards and measures in anatomic pathology quality assurance and patient safety were reviewed. Frequency of anatomic pathology laboratory error, variability in the use of specific quality assurance practices, and use of data for error reduction initiatives. Anatomic pathology error frequencies vary according to the detection method used. Based on secondary review, a College of American Pathologists Q-Probes study showed that the mean laboratory error frequency was 6.7%. A College of American Pathologists Q-Tracks study measuring frozen section discrepancy found that laboratories improved the longer they monitored and shared data. There is a lack of standardization across laboratories even for governmentally mandated quality assurance practices, such as cytologic-histologic correlation. The National Institutes of Health funded a consortium of laboratories to benchmark laboratory error frequencies, perform root cause analysis, and design error reduction initiatives, using quality assurance data. Based on the cytologic-histologic correlation process, these laboratories found an aggregate nongynecologic error frequency of 10.8%. Based on gynecologic error data, the laboratory at my institution used Toyota production system processes to lower gynecologic error frequencies and to improve Papanicolaou test metrics. Laboratory quality assurance practices have been used to track error rates, and laboratories are starting to use these data for error reduction initiatives.

  9. Quality planning and executive force of program files in quality management

    International Nuclear Information System (INIS)

    Sun Danyu

    2008-01-01

    This paper discussed the quality planning in quality management. In the quality planning, the quality objectives, the quality liabilities and the procedures shall be developed, grading supervise shall be exercised, quality assurance program shall be established, and requirements on resource and documents shall be defined. At the same time, we shall also intensify and enhance the execute force of program documentation, supervise and inspect the implementation result, establish detailed check indicators, and bring up the requirement on how to improve the quality of products. (author)

  10. ITER safety studies: starting the quality plan code AINA; Estudios de seguridad de ITER: Puesta en marcha del plan de calidad del Codigo AINA

    Energy Technology Data Exchange (ETDEWEB)

    Dies, J.; Rivas, J. C.; Bargallo, E.

    2010-07-01

    This contribution discusses the implementation of the Quality Plan AINA Code 2.0. The work has affected areas such as the life cycle model, the software reliability plan, the design of the equipment or software tools to use, and has finally produced a new code.

  11. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  12. Evaluation procedure of software safety plan for digital I and C of KNGR

    International Nuclear Information System (INIS)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4

  13. Evaluation procedure of software safety plan for digital I and C of KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4.

  14. [Implementation of a safety and health planning system in a teaching hospital].

    Science.gov (United States)

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  15. Food quality and safety management

    Directory of Open Access Journals (Sweden)

    Agnieszka Bilska

    2014-09-01

    Full Text Available Ensuring quality and safety of food are nowadays the most important goals set by companies who produce and distribute it. As a result, regulations have been introduced in the European Union countries concerning the production and distribution of food as well as norms which oblige companies to implement and execute several quality management systems.

  16. Quality assurance of radiotherapy in cancer treatment. Toward improvement of patient safety and quality of care

    International Nuclear Information System (INIS)

    Ishikura, Satoshi

    2008-01-01

    The process of radiotherapy (RT) is complex and involves understanding of the principles of medical physics, radiobiology, radiation safety, dosimetry, radiation treatment planning, simulation and interaction of radiation with other treatment modalities. Each step in the integrated process of RT needs quality control and quality assurance (QA) to prevent errors and to give high confidence that patients will receive the prescribed treatment correctly. Recent advances in RT, including intensity-modulated and image-guided RT, focus on the need for a systematic RTQA program that balances patient safety and quality with available resources. It is necessary to develop more formal error mitigation and process analysis methods, such as failure mode and effect analysis, to focus available QA resources optimally on process components. External audit programs are also effective. The International Atomic Energy Agency has operated both an on-site and off-site postal dosimetry audit to improve practice and to assure the dose from RT equipment. Several countries have adopted a similar approach for national clinical auditing. In addition, clinical trial QA has a significant role in enhancing the quality of care. The Advanced Technology Consortium has pioneered the development of an infrastructure and QA method for advanced technology clinical trials, including credentialing and individual case review. These activities have an impact not only on the treatment received by patients enrolled in clinical trials, but also on the quality of treatment administered to all patients treated in each institution, and have been adopted globally; by the USA, Europe and Japan also. (author)

  17. Quality assurance of radiotherapy in cancer treatment: toward improvement of patient safety and quality of care.

    Science.gov (United States)

    Ishikura, Satoshi

    2008-11-01

    The process of radiotherapy (RT) is complex and involves understanding of the principles of medical physics, radiobiology, radiation safety, dosimetry, radiation treatment planning, simulation and interaction of radiation with other treatment modalities. Each step in the integrated process of RT needs quality control and quality assurance (QA) to prevent errors and to give high confidence that patients will receive the prescribed treatment correctly. Recent advances in RT, including intensity-modulated and image-guided RT, focus on the need for a systematic RTQA program that balances patient safety and quality with available resources. It is necessary to develop more formal error mitigation and process analysis methods, such as failure mode and effect analysis, to focus available QA resources optimally on process components. External audit programs are also effective. The International Atomic Energy Agency has operated both an on-site and off-site postal dosimetry audit to improve practice and to assure the dose from RT equipment. Several countries have adopted a similar approach for national clinical auditing. In addition, clinical trial QA has a significant role in enhancing the quality of care. The Advanced Technology Consortium has pioneered the development of an infrastructure and QA method for advanced technology clinical trials, including credentialing and individual case review. These activities have an impact not only on the treatment received by patients enrolled in clinical trials, but also on the quality of treatment administered to all patients treated in each institution, and have been adopted globally; by the USA, Europe and Japan also.

  18. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  19. A summary of deliberations on strategic planning for continuous quality improvement in laboratory medicine.

    Science.gov (United States)

    Grzybicki, Dana Marie; Shahangian, Shahram; Pollock, Anne M; Raab, Stephen S

    2009-03-01

    On September 24-26, 2007, the Centers for Disease Control and Prevention convened the 2007 Institute on Critical Issues in Health Laboratory Practice: Managing for Better Health to develop an action plan for change for the immediate and long-term future. A wide variety of stakeholders, including pathologists, pathologist extenders, clinicians, and researchers, examined means to improve laboratory service communication, quality parameters, and potential future laboratory contributions to health care. In this summary document, we present the identified gaps, barriers, and proposed action plans for improvement for laboratory medicine in the 6 quality domains identified by the Institute of Medicine: safety, effectiveness, patient centeredness, timeliness, efficiency, and equity. Five major recommendations emerged from concluding discussions and included focusing on preanalytic and postanalytic processes as areas of potential quality improvement and recruiting a multidisciplinary group of nonlaboratory stakeholders to work with laboratory personnel to achieve improvement goals.

  20. Using IT to improve quality at NewYork-Presybterian Hospital: a requirements-driven strategic planning process.

    Science.gov (United States)

    Kuperman, Gilad J; Boyer, Aurelia; Cole, Curt; Forman, Bruce; Stetson, Peter D; Cooper, Mary

    2006-01-01

    At NewYork-Presbyterian Hospital, we are committed to the delivery of high quality care. We have implemented a strategic planning process to determine the information technology initiatives that will best help us improve quality. The process began with the creation of a Clinical Quality and IT Committee. The Committee identified 2 high priority goals that would enable demonstrably high quality care: 1) excellence at data warehousing, and 2) optimal use of automated clinical documentation to capture encounter-related quality and safety data. For each high priority goal, a working group was created to develop specific recommendations. The Data Warehousing subgroup has recommended the implementation of an architecture management process and an improved ability for users to get access to aggregate data. The Structured Documentation subgroup is establishing recommendations for a documentation template creation process. The strategic planning process at times is slow, but assures that the organization is focusing on the information technology activities most likely to lead to improved quality.

  1. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  2. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  3. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  4. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    Science.gov (United States)

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  5. High-heat tank safety issue resolution program plan. Revision 2

    International Nuclear Information System (INIS)

    Wang, O.S.

    1994-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank 241-C-106. The heat source of approximately 110,000 Btu/hr is the radioactive decay of the stored waste material (primarily 90 Sr) inadvertently transferred into the tank in the later 1960s. Currently, forced ventilation, with added water to promote thermal conductivity and evaporation cooling, is used for heat removal. The method is very effective and economical. At this time, the only viable solution identified to permanently resolve this safety issue is the removal of heat-generating waste in the tank. This solution is being aggressively pursued as the only remediation method to this safety issue, and tank 241-C-106 has been selected as the first single-shell tank for retrieval. The current cooling method and other alternatives are addressed in this program as means to mitigate this safety issue before retrieval. This program plan has three parts. The first part establishes program objectives and defines safety issue, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and other alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. A table of best-estimate schedules for the key tasks is also included in this program plan

  6. Quality control guarantees the safety of radiotherapy

    International Nuclear Information System (INIS)

    Aaltonen, P.

    1994-01-01

    While radiotherapy equipment has seen some decisive improvements in the last few decades, the technology has also become more complicated. The advanced equipment produces increasingly good treatment results, but the condition of the equipment must be controlled efficiently so as to eliminate any defects that might jeopardise patient safety. The quality assurance measures that are taken to show that certain equipment functions as required are known as quality control. The advanced equipment and stricter requirements set for the precision of radiotherapy have meant that more attention must be paid to quality control. The present radiation legislation stipulates that radiotherapy equipment must undergo regular quality control. The implementation of the quality control is supervised by the Finnish Centre for Radiation and Nuclear Safety (STUK). Hospitals carry out quality control in accordance with a programme approved by STUK, and STUK inspectors periodically visit hospitals to check the results of quality control. (orig.)

  7. Building quality into performance and safety assessment software

    International Nuclear Information System (INIS)

    Wojciechowski, L.C.

    2011-01-01

    Quality assurance is integrated throughout the development lifecycle for performance and safety assessment software. The software used in the performance and safety assessment of a Canadian deep geological repository (DGR) follows the CSA quality assurance standard CSA-N286.7 [1], Quality Assurance of Analytical, Scientific and Design Computer Programs for Nuclear Power Plants. Quality assurance activities in this standard include tasks such as verification and inspection; however, much more is involved in producing a quality software computer program. The types of errors found with different verification methods are described. The integrated quality process ensures that defects are found and corrected as early as possible. (author)

  8. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is required. 1106.3 Section 1106.3 Transportation Other Regulations Relating to Transportation (Continued... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS...

  9. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience.

    Science.gov (United States)

    Gunnarsdóttir, María J; Gissurarson, Loftur R

    2008-09-01

    Icelandic waterworks first began implementing hazard analysis and critical control points (HACCP) as a preventive approach for water safety management in 1997. Since then implementation has been ongoing and currently about 68% of the Icelandic population enjoy drinking water from waterworks with a water safety plan based on HACCP. Preliminary evaluation of the success of HACCP implementation was undertaken in association with some of the waterworks that had implemented HACCP. The evaluation revealed that compliance with drinking water quality standards improved considerably following the implementation of HACCP. In response to their findings, waterworks implemented a large number of corrective actions to improve water safety. The study revealed some limitations for some, but not all, waterworks in relation to inadequate external and internal auditing and a lack of oversight by health authorities. Future studies should entail a more comprehensive study of the experience with the use of HACCP with the purpose of developing tools to promote continuing success.

  10. SWiFT Software Quality Assurance Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Berg, Jonathan Charles [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  11. 42 CFR 441.474 - Quality assurance and improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assurance and improvement plan. 441.474... improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State... pursue opportunities for system improvement. (b) The quality assurance and improvement plan shall also...

  12. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Deficiencies and quality improvement plans. 1304... must correct the deficiency either immediately or pursuant to a Quality Improvement Plan. (c) An Early... Improvement Plan must submit to the responsible HHS official a Quality Improvement Plan specifying, for each...

  13. Watershed safety and quality control by safety threshold method

    Science.gov (United States)

    Da-Wei Tsai, David; Mengjung Chou, Caroline; Ramaraj, Rameshprabu; Liu, Wen-Cheng; Honglay Chen, Paris

    2014-05-01

    Taiwan was warned as one of the most dangerous countries by IPCC and the World Bank. In such an exceptional and perilous island, we would like to launch the strategic research of land-use management on the catastrophe prevention and environmental protection. This study used the watershed management by "Safety Threshold Method" to restore and to prevent the disasters and pollution on island. For the deluge prevention, this study applied the restoration strategy to reduce total runoff which was equilibrium to 59.4% of the infiltration each year. For the sediment management, safety threshold management could reduce the sediment below the equilibrium of the natural sediment cycle. In the water quality issues, the best strategies exhibited the significant total load reductions of 10% in carbon (BOD5), 15% in nitrogen (nitrate) and 9% in phosphorus (TP). We found out the water quality could meet the BOD target by the 50% peak reduction with management. All the simulations demonstrated the safety threshold method was helpful to control the loadings within the safe range of disasters and environmental quality. Moreover, from the historical data of whole island, the past deforestation policy and the mistake economic projects were the prime culprits. Consequently, this study showed a practical method to manage both the disasters and pollution in a watershed scale by the land-use management.

  14. The advanced neutron source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1989-01-01

    The Advanced Neutron Source (ANS) is a user facility for all areas of neutron research proposed for construction at the Oak Ridge National Laboratory. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements [which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies] into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences. 8 refs., 2 tabs

  15. The Advanced Neutron Source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1990-01-01

    The Advanced Neutron Source (ANS) is a user facility proposed for construction at the Oak Ridge National Laboratory for all areas of neutron research. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements (which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies) into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences

  16. Russian MINATOM nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    1999-03-01

    The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)

  17. Quality management of pharmacology and safety pharmacology studies

    DEFF Research Database (Denmark)

    Spindler, Per; Seiler, Jürg P

    2002-01-01

    to safety pharmacology studies, and, when indicated, to secondary pharmacodynamic studies, does not influence the scientific standards of studies. However, applying formal GLP standards will ensure the quality, reliability and integrity of studies, which reflect sound study management. It is important...... to encourage a positive attitude among researchers and academics towards these lines, whenever possible. GLP principles applied to the management of non-clinical safety studies are appropriate quality standards when studies are used in the context of protecting public health, and these quality standards...... of pharmacology studies (ICH S7A): primary pharmacodynamic, secondary pharmacodynamic and safety pharmacology studies, and guidance on the quality standards (expectations for GLP conformity) for these study types have been provided. Primary pharmacodynamic studies are the only study types that are fully exempt...

  18. Theoretical Application of Supervision over Quality and Safety of Agricultural Products

    Institute of Scientific and Technical Information of China (English)

    Xin; CHENG; Ying; ZHANG

    2013-01-01

    Supervision over quality and safety of agricultural products has received high attention of management department.Competent authorities have formulated and issued many measures to strengthen supervision over quality and safety of agricultural products and improve China’s agricultural product quality and safety level.From the perspective of management science,this paper elaborates basic contents of two basic management theories,Broken Windows Effect and Effect of Heat Furnace.Then,it analyzes influence of Broken Windows Effect and Effect of Heat Furnace on supervision over quality and safety of agricultural products.Finally,it comes up with recommendations for supervision over quality and safety of agricultural products.

  19. Kilowatt isotope power system. Phase II plan. Volume V. Safety, quality assurance and reliability

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Included in this volume are: launch and flight safety considerations; quality assurance techniques and procedures to be followed through system fabrication, assembly and inspection; and the reliability program made up of reliability prediction analysis, failure mode analysis and criticality analysis

  20. QUALITY FUNCTION DEPLOYMENT AS A STRATEGIC PLANNING TOOL

    OpenAIRE

    DEVRİM İÇTENBAŞ, Burcu; ERYILMAZ, Hande

    2011-01-01

    Quality Function Deployment (QFD) uses a house of quality to translate customer requirements into engineering specifications. QFD has been widely used as a tool to develop new products. It has been adopted in the fields of education quality, service quality, software development and marketing planning. The tool has recently been applied in strategic planning .In this study authors reviewed current research which uses QFD as a strategic planning tool and described how QFD methods can be ...

  1. 42 CFR 84.40 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  2. 30 CFR 28.30 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  3. Planning and evaluation of plant under safety aspects

    International Nuclear Information System (INIS)

    Strnad, H.

    1985-01-01

    Plant denotes a technical product characterized as being structured, complex, comprising the use of energy, and that of measuring, automatic control and monitoring systems to keep track of present, control and monitor processes. Particular attention is paid to methods of developing plant concepts, measures to exclude or detect risks, integration of safety engineering into the course of planning, safety concept and ergonomics in plant design. (DG) [de

  4. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    Science.gov (United States)

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  5. Safety, Quality, Schedule: the motto of LS1

    CERN Multimedia

    2013-01-01

    The LHC’s first long shutdown, LS1, is a marathon that began on 16 February and will take us through to the beginning of 2015. Just as Olympic marathon runners have a motto, Citius, Altius, Fortius, so the athletes of LS1 work to the mantra of Safety, Quality, Schedule. Four months into LS1, they have settled into their rhythm, and things are going to plan.   The first task of LS1 was to bring the LHC up to room temperature - this was achieved in just 10 weeks. In parallel, preliminary tests for electrical quality assurance and leaks revealed essentially the level of wear and tear we’d expect after three years of running. One slightly anxious moment came when we looked at the RF fingers – the devices that ensure electrical contact in the beam pipes as they pass from one magnet to the next. Those of you with long memories will recall that before start-up, some of these got damaged at warm-up. The good news today is that with all eight sectors test...

  6. Quality planning for major plant design modifications

    International Nuclear Information System (INIS)

    Dulee, R.J.

    1988-01-01

    This paper reviews the approach and activities undertaken by Public Service Electric and Gas Company's (PSE and G's) nuclear quality assurance (QA) department to support major plant design modifications conducted during refueling outages at Salem Generating Station. It includes the planning and implementation of quality plans developed to provide both QA and quality control (QC) coverage of modification performed by contracted service organizations

  7. A new plan quality index for nasopharyngeal cancer SIB IMRT.

    Science.gov (United States)

    Jin, X; Yi, J; Zhou, Y; Yan, H; Han, C; Xie, C

    2014-02-01

    A new plan quality index integrating dosimetric and radiobiological indices was proposed to facilitate the evaluation and comparison of simultaneous integrated boost (SIB) intensity modulated radiotherapy (IMRT) plans for nasopharyngeal cancer (NPC) patients. Ten NPC patients treated by SIB-IMRT were enrolled in the study. Custom software was developed to read dose-volume histogram (DVH) curves from the treatment planning system (TPS). A plan filtering matrix was introduced to filter plans that fail to satisfy treatment protocol. Target plan quality indices and organ at risk (OAR) plan quality indices were calculated for qualified plans. A unique composite plan quality index (CPQI) was proposed based on the relative weight of these indices to evaluate and compare competing plans. Plan ranking results were compared with detailed statistical analysis, radiation oncology quality system (ROQS) scoring results and physician's evaluation results to verify the accuracy of this new plan quality index. The average CPQI values for plans with OAR priority of low, normal, high, and PTV only were 0.22 ± 0.08, 0.49 ± 0.077, 0.71 ± 0.062, and -0.21 ± 0.16, respectively. There were significant differences among these plan quality indices (One-way ANOVA test, p plans were selected. Plan filtering matrix was able to speed up the plan evaluation process. The new matrix plan quality index CPQI showed good consistence with physician ranking results. It is a promising index for NPC SIB-IMRT plan evaluation. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  8. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  9. Innovation of Supervision System for Quality and Safety of Edible Agricultural Products

    Institute of Scientific and Technical Information of China (English)

    Xingxing; MEI; Zhongchao; FENG

    2014-01-01

    This paper elaborated multidimensional characteristics of quality and safety of agricultural products,introduced current situation of quality and safety supervision of edible agricultural products in China,analyzed existing problems of quality and safety supervision system and corresponding reasons,and finally came up with recommendations for innovation of supervision system for quality and safety of agricultural products.

  10. Renewing focus on family planning service quality globally.

    Science.gov (United States)

    Hancock, Nancy L; Stuart, Gretchen S; Tang, Jennifer H; Chibwesha, Carla J; Stringer, Jeffrey S A; Chi, Benjamin H

    2016-01-01

    Reducing the global unmet need for contraception is currently a priority for many governments, multi-lateral initiatives, non-governmental organizations, and donors. Evidence strongly suggests that the provision of quality family planning services can increase uptake, prevalence, and continuation of contraception. While an accepted framework to define the components of family planning service quality exists, translating this framework into assessment tools that are accessible, easily utilized, and valid for service providers has remained a challenge. We propose new approaches to improve the standardization and accessibility of family planning service quality assessment tools to simplify family planning service quality evaluation. With easier approaches to program evaluation, quality improvements can be performed more swiftly to help increase uptake and continuation of contraception to improve the health of women and their families.

  11. 222-S Laboratory Quality Assurance Plan. Revision 1

    International Nuclear Information System (INIS)

    Meznarich, H.K.

    1995-01-01

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document

  12. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  13. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division

  14. 77 FR 58488 - Hawaii State Plan for Occupational Safety and Health

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health AGENCY: Occupational... announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State...

  15. Implication of spot position error on plan quality and patient safety in pencil-beam-scanning proton therapy

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Juan; Beltran, Chris J., E-mail: beltran.chris@mayo.edu; Herman, Michael G. [Division of Medical Physics, Department of Radiation Oncology, Mayo Clinic, Rochester, Minnesota 55905 (United States)

    2014-08-15

    Purpose: To quantitatively and systematically assess dosimetric effects induced by spot positioning error as a function of spot spacing (SS) on intensity-modulated proton therapy (IMPT) plan quality and to facilitate evaluation of safety tolerance limits on spot position. Methods: Spot position errors (PE) ranging from 1 to 2 mm were simulated. Simple plans were created on a water phantom, and IMPT plans were calculated on two pediatric patients with a brain tumor of 28 and 3 cc, respectively, using a commercial planning system. For the phantom, a uniform dose was delivered to targets located at different depths from 10 to 20 cm with various field sizes from 2{sup 2} to 15{sup 2} cm{sup 2}. Two nominal spot sizes, 4.0 and 6.6 mm of 1 σ in water at isocenter, were used for treatment planning. The SS ranged from 0.5 σ to 1.5 σ, which is 2–6 mm for the small spot size and 3.3–9.9 mm for the large spot size. Various perturbation scenarios of a single spot error and systematic and random multiple spot errors were studied. To quantify the dosimetric effects, percent dose error (PDE) depth profiles and the value of percent dose error at the maximum dose difference (PDE [ΔDmax]) were used for evaluation. Results: A pair of hot and cold spots was created per spot shift. PDE[ΔDmax] is found to be a complex function of PE, SS, spot size, depth, and global spot distribution that can be well defined in simple models. For volumetric targets, the PDE [ΔDmax] is not noticeably affected by the change of field size or target volume within the studied ranges. In general, reducing SS decreased the dose error. For the facility studied, given a single spot error with a PE of 1.2 mm and for both spot sizes, a SS of 1σ resulted in a 2% maximum dose error; a SS larger than 1.25 σ substantially increased the dose error and its sensitivity to PE. A similar trend was observed in multiple spot errors (both systematic and random errors). Systematic PE can lead to noticeable hot

  16. A report on developing a checklist to assess company plans focused on improving safety awareness, safe behaviour and safety culture: final report

    NARCIS (Netherlands)

    Steijger, N.; Starren, H.; Keus, M.; Gort, J.; Vervoort, M.

    2003-01-01

    This report describes the process of developing a checklist to asses company plans focused on improving safety awareness, safe behaviour and safety culture. These plans are part of a programme initiated by the Ministry of Social Affairs and Employment aiming at improving the safety performance of

  17. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  18. Safety issue resolution strategy plan for inactive miscellaneous underground storage tanks

    International Nuclear Information System (INIS)

    Wang, O.S.; Powers, T.B.

    1994-09-01

    The purpose of this strategy plan is to identify, confirm, and resolve safely issues associated with inactive miscellaneous underground storage tanks (MUSTs) using a risk-based priority approach. Assumptions and processes to assess potential risks and operational concerns are documented in this report. Safety issue priorities are ranked based on a number of considerations including risk ranking and cost effectiveness. This plan specifies work scope and recommends schedules for activities related to resolving safety issues, such as collecting historical data, searching for authorization documents, performing Unreviewed Safety Question (USQ) screening and evaluation, identifying safety issues, imposing operational controls and monitoring, characterizing waste contents, mitigating and resolving safety issues, and fulfilling other remediation requirements consistent with the overall Tank Waste Remediation System strategy. Recommendations for characterization and remediation are also recommended according to the order of importance and practical programmatic consideration

  19. Research and development quality assurance planning

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  20. Research and development quality assurance planning

    International Nuclear Information System (INIS)

    Hoke, P.B.

    1990-01-01

    Planning for quality assurance (QA) in research and development (R ampersand D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R ampersand D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R ampersand D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig

  1. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  2. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  3. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  4. Observations and lessons learnt from more than a decade of water safety planning in South-East Asia.

    Science.gov (United States)

    Sutherland, David

    2017-09-01

    In many countries of the World Health Organization (WHO) South-East Asia Region, drinking water is not used directly from the tap and faecal contamination of water sources is prevalent. As reflected in Sustainable Development Goal 6, access to safer drinking water is one of the most successful ways of preventing disease. The WHO Water Safety Framework promotes the use of water safety plans (WSPs), which are structured tools that help identify and mitigate potential risks throughout a water-supply system, from the water source to the point of use. WSPs not only help prevent outbreaks of acute and chronic waterborne diseases but also improve water-supply management and performance. During the past 12 years, through the direct and indirect work of a water quality partnership supported by the Australian Government, more than 5000 urban and rural WSPs have been implemented in the region. An impact assessment based on pre- and post-WSP surveys suggests that WSPs have improved system operations and management, infrastructure and performance; leveraged donor funds; increased stakeholder communication and collaboration; increased testing of water quality; and increased monitoring of consumer satisfaction. These achievements, and their sustainability, are being achieved through national legislation and regulatory frameworks for water supply, including quality standards for drinking water; national training tools and extensive training of sector professionals and creation of WSP experts; model WSPs; WSP auditing systems; and the institution of longterm training and support. More than a decade of water safety planning using the WSP approach has shown that supplying safe drinking water at the tap throughout the WHO South-East Asia Region is a realistic goal.

  5. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  6. A review of national policies and strategies to improve quality of health care and patient safety: a case study from Lebanon and Jordan.

    Science.gov (United States)

    El-Jardali, Fadi; Fadlallah, Racha

    2017-08-16

    Improving quality of care and patient safety practices can strengthen health care delivery systems, improve health sector performance, and accelerate attainment of health-related Sustainability Development Goals. Although quality improvement is now prominent on the health policy agendas of governments in low- and middle-income countries (LMICs), including countries of the Eastern Mediterranean Region (EMR), progress to date has not been optimal. The objective of this study is to comprehensively review existing quality improvement and patient safety policies and strategies in two selected countries of the EMR (Lebanon and Jordan) to determine the extent to which these have been institutionalized within existing health systems. We used a mixed methods approach that combined documentation review, stakeholder surveys and key informant interviews. Existing quality improvement and patient safety initiatives were assessed across five components of an analytical framework for assessing health care quality and patient safety: health systems context; national policies and legislation; organizations and institutions; methods, techniques and tools; and health care infrastructure and resources. Both Lebanon and Jordan have made important progress in terms of increased attention to quality and accreditation in national health plans and strategies, licensing requirements for health care professionals and organizations (albeit to varying extents), and investments in health information systems. A key deficiency in both countries is the absence of an explicit national policy for quality improvement and patient safety across the health system. Instead, there is a spread of several (disjointed) pieces of legal measures and national plans leading to fragmentation and lack of clear articulation of responsibilities across the entire continuum of care. Moreover, both countries lack national sets of standardized and applicable quality indicators for performance measurement and benchmarking

  7. Plan for safety case of spent fuel repository at Olkiluoto

    International Nuclear Information System (INIS)

    Vieno, T.; Ikonen, A.T.K.

    2005-02-01

    Posiva aims to present the Safety Case supporting the construction license application of the spent fuel repository at Olkiluoto by 2012. An outline and preliminary assessments will be presented in 2009. Interim reporting and an update of the Safety Case plan will be presented in 2006, as required by the authorities. The KBS-3 disposal concept aims at long-term isolation and containment of spent fuel assemblies in durable copper-iron canisters emplaced in a repository to be constructed at a depth between 400 and 600 metres in crystalline bedrock. By 2012, studies on the KBS-3 disposal concept and site investigations at Olkiluoto will have been continued over about thirty years. The construction of an underground rock characterisation facility (called ONKALO) was started in June 2004. The investigations are carried out in close cooperation with the Swedish SKB developing and assessing the same disposal concept at candidate sites, resembling Olkiluoto, at the other side of the Baltic Sea. A safety case is the synthesis of evidence, analyses and arguments that quantify and substantiate the safety, and the level of expert confidence in the safety, of a planned repository. Posiva's Safety Case will be organised in a portfolio including ten main reports, which will be periodically updated according the overall schedule presented in the plan. The Site report describing the present state and past evolution of the Olkiluoto site, as well as the disturbances caused by the construction of ONKALO and the first stage of the repository, forms the geoscientific basis of the Safety Case. The engineering basis is provided by the reports on the Characteristics of spent fuel, Canister design, and Repository design. The Process report containing descriptions and analyses of features, events and processes potentially affecting the disposal system, and the report on the Evolution of site and repository form the scientific basis of the Safety Case. The latter report will describe and

  8. The strategic plan for the Committee on the Safety of Nuclear Installations

    International Nuclear Information System (INIS)

    2000-01-01

    Following the request from the NEA that all the committees should develop Strategic Plans and the report of the Effectiveness Review Group (ERG) on the effectiveness of CSNI's activities, CSNI created a Strategic Planning Group to review their working processes. In developing a five year rolling Strategic Plan, the Group has considered the need for more top-down direction by CSNI, stricter control on time limited Task Groups and improved communications including timely review and publication of reports. The Strategic Planning Group, after reviewing the current work structure of CSNI and the current technical issues as laid out in the SESAR series of reports and the CNRA report on Regulatory Effectiveness, have made the following recommendations. The basic elements of the CSNI will continue to be the Principal Working Groups, which will be known in future simply as Working Groups. The number of Working Groups and their areas of expertise will be reviewed periodically when the strategic plan undergoes a review. It is recommended that this Plan be reviewed every five years. In order to provide better top-down direction by the CSNI, it is recommended that a small Programme Review Group (PRG) be created. The PRG will assist the CSNI Bureau to review proposals from the Working Groups, and enable the review of major reports to ensure high quality. To ensure timely management of projects and reviews of proposals and reports it is recommended that CSNI have a second full meeting in early summer. It is recommended that Special Expert Groups (SEGs) be created reporting directly to CSNI. These Groups would deal with issues that cut across the disciplines of more than one Working Group and be assigned clear time-limited mandates. The creation of SEGs on Fuel Safety Margins and on Human and Organisational Factors is proposed at this time. Restructuring of the five Principal Working Groups into four Working Groups is recommended. This would be accomplished by merging the former

  9. Measuring the Impacts of Water Safety Plans in the Asia-Pacific Region

    Directory of Open Access Journals (Sweden)

    Emily Kumpel

    2018-06-01

    Full Text Available This study investigated the effectiveness of Water Safety Plans (WSP implemented in 99 water supply systems across 12 countries in the Asia-Pacific region. An impact assessment methodology including 36 indicators was developed based on a conceptual framework proposed by the Center for Disease Control (CDC and before/after data were collected between November 2014 and June 2016. WSPs were associated with infrastructure improvements at the vast majority (82 of participating sites and to increased financial support at 37 sites. In addition, significant changes were observed in operations and management practices, number of water safety-related meetings, unaccounted-for water, water quality testing activities, and monitoring of consumer satisfaction. However, the study also revealed challenges in the implementation of WSPs, including financial constraints and insufficient capacity. Finally, this study provided an opportunity to test the impact assessment methodology itself, and a series of recommendations are made to improve the approach (indicators, study design, data collection methods for evaluating WSPs.

  10. Quality-assurance plan for groundwater activities, U.S. Geological Survey, Washington Water Science Center

    Science.gov (United States)

    Kozar, Mark D.; Kahle, Sue C.

    2013-01-01

    This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data

  11. Quality improvement initiatives: the missed opportunity for health plans.

    Science.gov (United States)

    Fernandez-Lopez, Sara; Lennert, Barbara

    2009-11-01

    The increase in healthcare cost without direct improvements in health outcomes, coupled with a desire to expand access to the large uninsured population, has underscored the importance of quality initiatives and organizations that provide more affordable healthcare by maximizing value. To determine the knowledge of managed care organizations about quality organizations and initiatives and to identify potential opportunities in which pharmaceutical companies could collaborate with health plans in the development and implementation of quality initiatives. We conducted a survey of 36 pharmacy directors and 15 medical directors of different plans during a Managed Care Network meeting in 2008. The represented plans cover almost 74 million lives in commercial, Medicare, and Medicaid programs, or a combination of them. The responses show limited knowledge among pharmacy and medical directors about current quality organizations and initiatives, except for quality organizations that provide health plan quality accreditation. The results also reveal an opportunity for pharmaceutical companies to collaborate with private health plans in the development of quality initiatives, especially those related to drug utilization, such as patient adherence and education and correct drug utilization. Our survey shows clearly that today's focus for managed care organizations is mostly limited to the organizations that provide health plan quality accreditation, with less focus on other organizations.

  12. Environmental, Safety, and Health Plan for the remedial investigation/feasibility study at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Revision 1, Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Davis, C. M.; El-Messidi, O. E.; Cowser, D. K.; Kannard, J. R.; Carvin, R. T.; Will, III, A. S.; Clark, Jr., C.; Garland, S. B.

    1993-05-01

    This Environmental, Safety, and Health (ES&H) Plan presents the concepts and methodologies to be followed during the remedial investigation/feasibility study (RI/FS) for Oak Ridge National Laboratory (ORNL) to protect the health and safety of employees, the public, and the environment. This ES&H Plan acts as a management extension for ORNL and Martin Marietta Energy Systems, Inc. (Energy Systems) to direct and control implementation of the project ES&H program. The subsections that follow describe the program philosophy, requirements, quality assurance measures, and methods for applying the ES&H program to individual waste area grouping (WAG) remedial investigations. Hazardous work permits (HWPs) will be used to provide task-specific health and safety requirements.

  13. School Climate: An Essential Component of a Comprehensive School Safety Plan

    Science.gov (United States)

    Stark, Heidi

    2017-01-01

    The intentional assessment and management of school climate is an essential component of a comprehensive school safety plan. The value of this preventive aspect of school safety is often diminished as schools invest resources in physical security measures as a narrowly focused effort to increase school safety (Addington, 2009). This dissertation…

  14. Factors impacting on the microbiological quality and safety of ...

    African Journals Online (AJOL)

    Problems with the safety and shelf life of export hake have been raised by the Namibian fishing industry. This prompted an investigation into the factors that may have an impact on the microbiological quality and safety of processed hake. Samples were collected along the processing line; the general microbiological quality ...

  15. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  16. European demands for food quality and safety

    OpenAIRE

    Bulatsyk, Sofiya; Yavorska, Nadiya

    2017-01-01

    In this article was investigated regulations and other normative documents of the European Union concerning food quality and safety and was arranged EU demands regards to food safety. There were determined the basic business concerns of the domestic enterprises in the process of manufacturing and marketing food products

  17. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  18. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  19. Quality management, a directive approach to patient safety.

    Science.gov (United States)

    Ayuso-Murillo, Diego; de Andrés-Gimeno, Begoña; Noriega-Matanza, Concha; López-Suárez, Rafael Jesús; Herrera-Peco, Ivan

    Nowadays the implementation of effective quality management systems and external evaluation in healthcare is a necessity to ensure not only transparency in activities related to health but also access to health and patient safety. The key to correctly implementing a quality management system is support from the managers of health facilities, since it is managers who design and communicate to health professionals the strategies of action involved in quality management systems. This article focuses on nursing managers' approach to quality management through the implementation of cycles of continuous improvement, participation of improvement groups, monitoring systems and external evaluation quality models (EFQM, ISO). The implementation of a quality management system will enable preventable adverse effects to be minimized or eliminated, and promote patient safety and safe practice by health professionals. Copyright © 2017 Elsevier España, S.L.U. All rights reserved.

  20. From Board to Bedside: How the Application of Financial Structures to Safety and Quality Can Drive Accountability in a Large Health Care System.

    Science.gov (United States)

    Austin, J Matthew; Demski, Renee; Callender, Tiffany; Lee, K H Ken; Hoffman, Ann; Allen, Lisa; Radke, Deborah A; Kim, Yungjin; Werthman, Ronald J; Peterson, Ronald R; Pronovost, Peter J

    2017-04-01

    As the health care system in the United States places greater emphasis on the public reporting of quality and safety data and its use to determine payment, provider organizations must implement structures that ensure discipline and rigor regarding these data. An academic health system, as part of a performance management system, applied four key components of a financial reporting structure to support the goal of top-to-bottom accountability for improving quality and safety. The four components implemented by Johns Hopkins Medicine were governance, accountability, reporting of consolidated quality performance statements, and auditing. Governance is provided by the health system's Patient Safety and Quality Board Committee, which reviews goals and strategy for patient safety and quality, reviews quarterly performance for each entity, and holds organizational leaders accountable for performance. An accountability plan includes escalating levels of review corresponding to the number of months an entity misses the defined performance target for a measure. A consolidated quality statement helps inform the Patient Safety and Quality Board Committee and leadership on key quality and safety issues. An audit evaluates the efficiency and effectiveness of processes for data collection, validation, and storage, as to ensure the accuracy and completeness of quality measure reporting. If hospitals and health systems truly want to prioritize improvements in safety and quality, they will need to create a performance management system that ensures data validity and supports performance accountability. Without valid data, it is difficult to know whether a performance gap is due to data quality or clinical quality. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  1. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  2. Quality and safety in Spain

    International Nuclear Information System (INIS)

    Prieto Barrio, J. M.; Martinez Martin, D. J.

    2015-01-01

    For three decades, and after the entry of Spain into the EU, it has been developed a regulatory, stable but evolving, framework that has allowed to create the conditions and structures to have stringent safety conditions of products and manufacturing facilities, as well as all the activities necessary for their certification and control. This development has been possible, among others, by the work of impulse and coordination of the Ministry of industry, Energy and Tourism, and particularly of the quality and Industrial safety sub directorate. On the other hand it has been developed a quality infrastructure that has, at the State level, with a standardisation (AENOR) entity and an accreditation body (ENAC) with recognized prestige around the world. In this article, in the first part, a list the regulations which apply to products and manufacturing facilities is shown, as well as explain the role played by standards and accreditation system in industrial safety and the factor of competitiveness that this entails for our industrial sector, and, in the second part, the institutional role of the Ministry and, the aforementioned Sub directorate, is described. The aim of the article is to be a descriptive reference of the current regulatory framework as well as the role of the State in this process. (Author)

  3. The influence of farmland pollution on the quality and safety of agricultural products

    Science.gov (United States)

    Ma, Z. L.; Li, L. Y.; Ye, C.; Lin, X. Y.; B, C.; Wei

    2018-02-01

    The quality and safety of agricultural products is not only a major livelihood issues for people’s health, but also the main barriers to international trade of agricultural products nowadays. The soil is the foundation to the production of agricultural products and the guarantee of agricultural development. The farmland soil quality is directly related to the quality and safety of agricultural products. Our country’s soil has been polluted by a series of pollution, Such as the excessive discharge of industrial wastes, the encroachment of household waste, and the unreasonable use of pesticides and fertilizers. Soil degradation is a serious threat to the quality and safety of agricultural products, so eliminating soil degradation is the fundamental way out for quality and safety of agricultural products. By analyzing problems of the quality and safety of agricultural products in our country, and exploring the farmland soil influence on the quality and safety of agricultural products. This article provides a reference for improving the control level of quality and safety of agricultural products and the farmland soil quality.

  4. Case study of physician leaders in quality and patient safety, and the development of a physician leadership network.

    Science.gov (United States)

    Hayes, Chris; Yousefi, Vandad; Wallington, Tamara; Ginzburg, Amir

    2010-01-01

    There is increasing recognition of the need for physician leadership in quality and patient safety, and emerging evidence that physician leadership contributes to improved care. Hospitals are beginning to establish physician leader positions; however, there is little guidance on how to define these roles and the strategies physician leaders can use toward improving care. This case study examines the roles of four physician leaders, describes their contribution to the design and implementation of hospital quality and patient safety agendas and discusses the creation of a physician network to support these activities. The positions were established between July 2006 and April 2009. All are corporate roles with varying reporting and accountability structures. The physician leads are involved in strategic planning, identifying and leading quality and safety initiatives, physician engagement and culture change. All have significantly contributed to the implementation of hospital improvement activities and are seen as influential among their peers as resources and mentors for local project success. Despite their accomplishments, these physician leads have been challenged by ambiguous role descriptions and difficulty identifying effective improvement strategies. As such, an expanding physician network was created with the goal of sharing approaches and tools and creating new strategies. Physician leaders are an important factor in the improvement of safety and quality within hospitals. This case study provides a template for the creation of such positions and highlights the importance of networking as an effective strategy for improving local care and advancing professional development of physician leaders in quality and patient safety.

  5. The evolving role and care management approaches of safety-net medicaid managed care plans

    OpenAIRE

    Gusmano, Michael K.; Sparer, Michael S.; Brown, Lawrence D.; Rowe, Catherine; Gray, Bradford

    2002-01-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods we studied these “safety-net” health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also f...

  6. Safety culture and quality management of Kartini research reactor

    International Nuclear Information System (INIS)

    Syarip; Hauptmanns, Ulrich

    1999-01-01

    The evaluation for assessing the safety culture and quality of safety management of Kartini research reactor is presented. The method is based on the concept of management control of safety (audit) as well as by using the developed method i.e. the questionnaires concerning areas of relevance which have to be answered with value statements. There are seven statements or qualifiers in answering the questions. Since such statements are vague, they are represented by fuzzy numbers. The weaknesses can be identified from the different areas contemplated. The evaluation result show that the quality of safety management of Kartini research reactor is globally rated as 'Average'. The operator behavior in the implementation of 'safety culture' concept is found as a weakness, therefore this area should be improved. (author)

  7. Ensuring the quality of occupational safety risk assessment.

    Science.gov (United States)

    Pinto, Abel; Ribeiro, Rita A; Nunes, Isabel L

    2013-03-01

    In work environments, the main aim of occupational safety risk assessment (OSRA) is to improve the safety level of an installation or site by either preventing accidents and injuries or minimizing their consequences. To this end, it is of paramount importance to identify all sources of hazards and assess their potential to cause problems in the respective context. If the OSRA process is inadequate and/or not applied effectively, it results in an ineffective safety prevention program and inefficient use of resources. An appropriate OSRA is an essential component of the occupational safety risk management process in industries. In this article, we performed a survey to elicit the relative importance for identified OSRA tasks to enable an in-depth evaluation of the quality of risk assessments related to occupational safety aspects on industrial sites. The survey involved defining a questionnaire with the most important elements (tasks) for OSRA quality assessment, which was then presented to safety experts in the mining, electrical power production, transportation, and petrochemical industries. With this work, we expect to contribute to the main question of OSRA in industries: "What constitutes a good occupational safety risk assessment?" The results obtained from the questionnaire showed that experts agree with the proposed OSRA process decomposition in steps and tasks (taxonomy) and also with the importance of assigning weights to obtain knowledge about OSRA task relevance. The knowledge gained will enable us, in the near future, to build a framework to evaluate OSRA quality for industrial sites. © 2012 Society for Risk Analysis.

  8. Safety research basic plan of JNC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Japan Nuclear Cycle Development Institute (JNC) formally succeeded to Power Reactor and Nuclear Fuel Development Corporation (PNC) on October, 1 1998. This report describes the basic plan for major program of JNC which consists of two parts: management philosophy of the new institute and the latest revised medium term program. In the first part, the primary mission of JNC is to perform its R and D concentrating on fast breeder reactor and its fuel cycle, and treatment and disposal of high-level radioactive wastes, while at the same time giving special consideration to safety. In the second, individual programs in the new basic plan are discussed in detail. The outline and schedule of each program are also attached in the table form. (H. Itami)

  9. Environmental, Safety, and Health Plan for the remedial investigation of the liquid low-level waste tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-09-01

    The Environmental, Safety, and Health (ES ampersand H) Plan presents the concepts and methodologies to be used during the Oak Ridge National Laboratory (ORNL) RI/FS project to protect the health and safety of employees, the public, and the environment. The ES ampersand H Plan acts as a management extension for ORNL and Energy Systems to direct and control implementation of the project ES ampersand H program. This report describes the program philosophy, requirements, quality assurance measures, and methods for applying the ES ampersand H program to individual task remedial investigations, project facilities, and other major tasks assigned to the project

  10. Quality assurance for software important to safety

    International Nuclear Information System (INIS)

    2000-01-01

    Software applications play an increasingly relevant role in nuclear power plant systems. This is particularly true of software important to safety used in both: calculations for the design, testing and analysis of nuclear reactor systems (design, engineering and analysis software); and monitoring, control and safety functions as an integral part of the reactor systems (monitoring, control and safety system software). Computer technology is advancing at a fast pace, offering new possibilities in nuclear reactor design, construction, commissioning, operation, maintenance and decommissioning. These advances also present new issues which must be considered both by the utility and by the regulatory organization. Refurbishment of ageing instrumentation and control systems in nuclear power plants and new safety related application areas have emerged, with direct (e.g. interfaces with safety systems) and indirect (e.g. operator intervention) implications for safety. Currently, there exist several international standards and guides on quality assurance for software important to safety. However, none of the existing documents provides comprehensive guidance to the developer, manager and regulator during all phases of the software life-cycle. The present publication was developed taking into account the large amount of available documentation, the rapid development of software systems and the need for updated guidance on h ow to do it . It provides information and guidance for defining and implementing quality assurance programmes covering the entire life-cycle of software important to safety. Expected users are managers, performers and assessors from nuclear utilities, regulatory bodies, suppliers and technical support organizations involved with the development and use of software applied in nuclear power plants

  11. Assuring fish safety and quality in international fish trade

    International Nuclear Information System (INIS)

    Ababouch, Lahsen . E-mail lahsen.ababouch@fao.org

    2006-01-01

    International trade in fishery commodities reached US$ 58.2 billion in 2002, a 5% improvement relative to 2000 and a 45% increase over 1992 levels. Within this global trade, developing countries registered a net trade surplus of US$ 17.4 billion in 2002 and accounted for almost 50% by value and 55% of fish exports by volume. This globalization of fish trade, coupled with technological developments in food production, handling, processing and distribution, and the increasing awareness and demand of consumers for safe and high quality food have put food safety and quality assurance high in public awareness and a priority for many governments. Consequently, many countries have tightened food safety controls, imposing additional costs and requirements on imports. As early as 1980, there was an international drive towards adopting preventative HACCP-based safety and quality systems. More recently, there has been a growing awareness of the importance of an integrated, multidisciplinary approach to food safety and quality throughout the entire food chain. Implementation of this approach requires an enabling policy and regulatory environment at national and international levels with clearly defined rules and standards, establishment of appropriate food control systems and programmes at national and local levels, and provision of appropriate training and capacity building. This paper discusses the international framework for fish safety and quality, with particular emphasis on the United Nation's Food and Agricultural Organization's (FAO) strategy to promote international harmonization and capacity building

  12. Assuring fish safety and quality in international fish trade

    Energy Technology Data Exchange (ETDEWEB)

    Ababouch, Lahsen [United Nations, Food and Agricultural Organization, Chief, Fish Utilization and Marketing Services, FAO Headquarters, F-607 Rome (Italy)]. E-mail lahsen.ababouch@fao.org

    2006-07-01

    International trade in fishery commodities reached US$ 58.2 billion in 2002, a 5% improvement relative to 2000 and a 45% increase over 1992 levels. Within this global trade, developing countries registered a net trade surplus of US$ 17.4 billion in 2002 and accounted for almost 50% by value and 55% of fish exports by volume. This globalization of fish trade, coupled with technological developments in food production, handling, processing and distribution, and the increasing awareness and demand of consumers for safe and high quality food have put food safety and quality assurance high in public awareness and a priority for many governments. Consequently, many countries have tightened food safety controls, imposing additional costs and requirements on imports. As early as 1980, there was an international drive towards adopting preventative HACCP-based safety and quality systems. More recently, there has been a growing awareness of the importance of an integrated, multidisciplinary approach to food safety and quality throughout the entire food chain. Implementation of this approach requires an enabling policy and regulatory environment at national and international levels with clearly defined rules and standards, establishment of appropriate food control systems and programmes at national and local levels, and provision of appropriate training and capacity building. This paper discusses the international framework for fish safety and quality, with particular emphasis on the United Nation's Food and Agricultural Organization's (FAO) strategy to promote international harmonization and capacity building.

  13. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  14. Quality management and perceptions of teamwork and safety climate in European hospitals.

    Science.gov (United States)

    Kristensen, Solvejg; Hammer, Antje; Bartels, Paul; Suñol, Rosa; Groene, Oliver; Thompson, Caroline A; Arah, Onyebuchi A; Kutaj-Wasikowska, Halina; Michel, Philippe; Wagner, Cordula

    2015-12-01

    This study aimed to investigate the associations of quality management systems with teamwork and safety climate, and to describe and compare differences in perceptions of teamwork climate and safety climate among clinical leaders and frontline clinicians. We used a multi-method, cross-sectional approach to collect survey data of quality management systems and perceived teamwork and safety climate. Our data analyses included descriptive and multilevel regression methods. Data on implementation of quality management system from seven European countries were evaluated including patient safety culture surveys from 3622 clinical leaders and 4903 frontline clinicians. Perceived teamwork and safety climate. Teamwork climate was reported as positive by 67% of clinical leaders and 43% of frontline clinicians. Safety climate was perceived as positive by 54% of clinical leaders and 32% of frontline clinicians. We found positive associations between implementation of quality management systems and teamwork and safety climate. Our findings, which should be placed in a broader clinical quality improvement context, point to the importance of quality management systems as a supportive structural feature for promoting teamwork and safety climate. To gain a deeper understanding of this association, further qualitative and quantitative studies using longitudinally collected data are recommended. The study also confirms that more clinical leaders than frontline clinicians have a positive perception of teamwork and safety climate. Such differences should be accounted for in daily clinical practice and when tailoring initiatives to improve teamwork and safety climate. © The Author 2015. Published by Oxford University Press in association with the International Society for Quality in Health Care; all rights reserved.

  15. Therapeutic risk management of the suicidal patient: safety planning.

    Science.gov (United States)

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  16. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, Matthew; Lachance, Jeff; Sofu, Tanju; Wigeland, Roald; Flanagan, George; Bari, Robert

    2013-01-01

    Conclusions: The Sodium Fast Reactor Safety and Licensing Research Plan reports conclude a multi-year expert elicitation process. All information included in the studies are publicly available and the reports are UUR. These reports are intended to guide SFR researchers in the safety and licensing arena to important and outstanding issues Two (and a half) projects have been funded based on the recommendations in this report: • Modernization of SAS4A; • Incorporation of Contain/LMR with MELCOR; • (Data recovery at INL and PNNL)

  17. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  18. Quality Assurance Planning for Region 9

    Science.gov (United States)

    The ultimate success of an environmental program or project depends on the quality of the environmental data collected and used in decision-making. EPA has developed guidances to help state and tribal governments develop Quality Assurance Program Plans.

  19. Visualising differences in professionals' perspectives on quality and safety.

    Science.gov (United States)

    Travaglia, Joanne Francis; Nugus, Peter Ivan; Greenfield, David; Westbrook, Johanna Irene; Braithwaite, Jeffrey

    2012-09-01

    The safety-and-quality movement is now two decades old. Errors persist despite best efforts, indicating that there are entrenched overt and perhaps less explicit barriers limiting the success of improvement efforts. OBJECTIVES AND HYPOTHESES: To examine the perspectives of five groups of healthcare workers (administrative staff, nurses, medical practitioners, allied health and managers) and to compare and contrast their descriptions of quality-and-safety activities within their organisation. Differences in perspectives can be an indicator of divergence in the conceptualisation of, and impetus for, quality-improvement strategies which are intended to engage healthcare professions and staff. Study data were collected in a defined geographical healthcare jurisdiction in Australia, via individual and group interviews held across four service streams (aged care and rehabilitation; mental health; community health; and cancer services). Data were collected in 2008 and analysed, using data-mining software, in 2009. Clear differences in the perspectives of professional groups were evident, suggesting variations in the perceptions of, and priorities for, quality and safety. The visual representation of quality and safety perspectives provides insights into the conceptual maps currently utilised by healthcare workers. Understanding the similarity and differences in these maps may enable more effective targeting of interprofessional improvement strategies.

  20. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  1. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  2. Safety culture and quality management of Kartini research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Syarip [Yogyakarta Nuclear Research Centre, Yogyakarta (Indonesia); Hauptmanns, Ulrich [Department of Plant Design and Safety, Otto-Von-Guericke-University, Magdeburg (Germany)

    1999-10-01

    The evaluation for assessing the safety culture and quality of safety management of Kartini research reactor is presented. The method is based on the concept of management control of safety (audit) as well as by using the developed method i.e. the questionnaires concerning areas of relevance which have to be answered with value statements. There are seven statements or qualifiers in answering the questions. Since such statements are vague, they are represented by fuzzy numbers. The weaknesses can be identified from the different areas contemplated. The evaluation result show that the quality of safety management of Kartini research reactor is globally rated as 'Average'. The operator behavior in the implementation of 'safety culture' concept is found as a weakness, therefore this area should be improved. (author)

  3. Total Quality Management and the System Safety Secretary

    Science.gov (United States)

    Elliott, Suzan E.

    1993-01-01

    The system safety secretary is a valuable member of the system safety team. As downsizing occurs to meet economic constraints, the Total Quality Management (TQM) approach is frequently adopted as a formula for success and, in some cases, for survival.

  4. Implementation plan for the Defense Nuclear Facilities Safety Board Recommendation 90-7

    International Nuclear Information System (INIS)

    Borsheim, G.L.; Cash, R.J.; Dukelow, G.T.

    1992-12-01

    This document revises the original plan submitted in March 1991 for implementing the recommendations made by the Defense Nuclear Facilities Safety Board in their Recommendation 90-7 to the US Department of Energy. Recommendation 90-7 addresses safety issues of concern for 24 single-shell, high-level radioactive waste tanks containing ferrocyanide compounds at the Hanford Site. The waste in these tanks is a potential safety concern because, under certain conditions involving elevated temperatures and low concentrations of nonparticipating diluents, ferrocyanide compounds in the presence of oxidizing materials can undergo a runaway (propagating) chemical reaction. This document describes those activities underway by the Hanford Site contractor responsible for waste tank safety that address each of the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7. This document also identifies the progress made on these activities since the beginning of the ferrocyanide safety program in September 1990. Revised schedules for planned activities are also included

  5. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  6. [Implementation of good quality and safety practices. Descriptive study in a occupational mutual health centre].

    Science.gov (United States)

    Manzanera, R; Plana, M; Moya, D; Ortner, J; Mira, J J

    2016-01-01

    To describe the level of implementation of quality and safety good practice elements in a Mutual Society health centre. A Cross-sectional study was conducted to assess the level of implementation of good practices using a questionnaire. Some quality dimensions were also assessed (scale 0 to 10) by a set of 87 quality coordinators of health centres and a random sample of 54 healthcare professionals working in small centres. Seventy quality coordinators and 27 professionals replied (response rates 80% and 50%, respectively. There were no differences in the assessment of quality attributes between both groups. They identified as areas for improvement: use of practice guidelines (7.6/10), scientific and technical skills (7.5/10), and patient satisfaction (7.7/10). Availability and accessibility to clinical reports, informed consent, availability of hydro-alcoholic solution, and to record allergies, were considered of high importance to be implemented, with training and research, improvements in equipment and technology plans, adherence to clinical practice guidelines and the preparation of risk maps, being of less importance. The good practices related to equipment and resources have a higher likelihood to be implemented, meanwhile those related to quality and safety attitudes have more barriers before being implemented. The mutual has a similar behaviour than other healthcare institutions. Copyright © 2015 SECA. Published by Elsevier Espana. All rights reserved.

  7. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''

  8. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements

  9. Regulating nuclear and radiation safety in the frame of the Chernobyl shelter Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bykov, V.; Demchyuk, A.; Kilochitska, T.; Redko, V. [State Nuclear Regulatory Committee of Ukraine, SNRCU, Arsenalna St. 9/11, Kyiv (Ukraine); Bogorinski, P. [GRS/IPSN-RISKAUDIT, Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Koeln (Germany); Vasilchenko, V.; Erickson, L.; Kadkin, E.; Kondratyev, S.; Kutina, L.; Smyshliaeva, S. [SSTC NRS, Stusa St. 35-37, 03142, Kyiv (Ukraine)

    2003-07-01

    Since 1998 the Shelter Implementation Plan (SIP) has been carried out on the Chernobyl NPP Unit 4 (the object Shelter - OS). The State Nuclear Regulatory Committee of Ukraine (SNRCU) recognizes the exceptional importance of successful and efficient SIP implementation and acts accordingly in regulation, licensing, and inspection. Technical support of the SNRCU in SIP licensing are provided by the State Scientific and Technical Center for Nuclear and Radiation Safety (SSTC) and the SIP Licensing Consultant (LC) representing RISKAUDIT IPSN/GRS International and SCIENTECH, Inc. Support of the SNRCU is also provided by the International Consultative Committee of Regulatory Bodies (ICCRB). ICCRB members represent regulatory authorities from nine European countries, Canada and the U.S. Summarizing the information above, it can be stated that a sound basis has been created for the licensing process for SIP. The approach for using the regulatory base has been determined. It ensures the establishment of safety objectives and gives ChNPP the freedom of optimal choice of specific technical decisions. The License has been issued for OS-related activities and a number of documents have been developed to conduct an effective and high quality authorization process: the Licensing Process; Recommendations on single SSR, Licensing Plan for SIP. The Order of State Safety Supervision for SIP has been approved. Working groups are functioning, whose purposes are to coordinate actions of participants in authorization activities, including ChNPP, SNRCU, and other RA.

  10. Regulating nuclear and radiation safety in the frame of the Chernobyl shelter Implementation Plan

    International Nuclear Information System (INIS)

    Bykov, V.; Demchyuk, A.; Kilochitska, T.; Redko, V.; Bogorinski, P.; Vasilchenko, V.; Erickson, L.; Kadkin, E.; Kondratyev, S.; Kutina, L.; Smyshliaeva, S.

    2003-01-01

    Since 1998 the Shelter Implementation Plan (SIP) has been carried out on the Chernobyl NPP Unit 4 (the object Shelter - OS). The State Nuclear Regulatory Committee of Ukraine (SNRCU) recognizes the exceptional importance of successful and efficient SIP implementation and acts accordingly in regulation, licensing, and inspection. Technical support of the SNRCU in SIP licensing are provided by the State Scientific and Technical Center for Nuclear and Radiation Safety (SSTC) and the SIP Licensing Consultant (LC) representing RISKAUDIT IPSN/GRS International and SCIENTECH, Inc. Support of the SNRCU is also provided by the International Consultative Committee of Regulatory Bodies (ICCRB). ICCRB members represent regulatory authorities from nine European countries, Canada and the U.S. Summarizing the information above, it can be stated that a sound basis has been created for the licensing process for SIP. The approach for using the regulatory base has been determined. It ensures the establishment of safety objectives and gives ChNPP the freedom of optimal choice of specific technical decisions. The License has been issued for OS-related activities and a number of documents have been developed to conduct an effective and high quality authorization process: the Licensing Process; Recommendations on single SSR, Licensing Plan for SIP. The Order of State Safety Supervision for SIP has been approved. Working groups are functioning, whose purposes are to coordinate actions of participants in authorization activities, including ChNPP, SNRCU, and other RA

  11. LMFBR safety experiment facility planning and analysis

    International Nuclear Information System (INIS)

    Stevenson, M.G.; Scott, J.H.

    1976-01-01

    In the past two years considerable effort has been placed on the planning and design of new facilities for the resolution of LMFBR safety issues. The paper reviews the key issues, the experiments needed to resolve them, and the design aspects of proposed new facilities. In addition, it presents a decision theory approach to selecting an optimal combination of modified and new facilities

  12. Quality-assurance plan for water-quality activities in the U.S. Geological Survey Washington Water Science Center

    Science.gov (United States)

    Conn, Kathleen E.; Huffman, Raegan L.; Barton, Cynthia

    2017-05-08

    In accordance with guidelines set forth by the Office of Water Quality in the Water Mission Area of the U.S. Geological Survey, a quality-assurance plan has been created for use by the Washington Water Science Center (WAWSC) in conducting water-quality activities. This qualityassurance plan documents the standards, policies, and procedures used by the WAWSC for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures documented in this quality-assurance plan for water-quality activities complement the quality-assurance plans for surface-water and groundwater activities at the WAWSC.

  13. Improved Planning Time and Plan Quality Through Multicriteria Optimization for Intensity-Modulated Radiotherapy

    International Nuclear Information System (INIS)

    Craft, David L.; Hong, Theodore S.; Shih, Helen A.; Bortfeld, Thomas R.

    2012-01-01

    Purpose: To test whether multicriteria optimization (MCO) can reduce treatment planning time and improve plan quality in intensity-modulated radiotherapy (IMRT). Methods and Materials: Ten IMRT patients (5 with glioblastoma and 5 with locally advanced pancreatic cancers) were logged during the standard treatment planning procedure currently in use at Massachusetts General Hospital (MGH). Planning durations and other relevant planning information were recorded. In parallel, the patients were planned using an MCO planning system, and similar planning time data were collected. The patients were treated with the standard plan, but each MCO plan was also approved by the physicians. Plans were then blindly reviewed 3 weeks after planning by the treating physician. Results: In all cases, the treatment planning time was vastly shorter for the MCO planning (average MCO treatment planning time was 12 min; average standard planning time was 135 min). The physician involvement time in the planning process increased from an average of 4.8 min for the standard process to 8.6 min for the MCO process. In all cases, the MCO plan was blindly identified as the superior plan. Conclusions: This provides the first concrete evidence that MCO-based planning is superior in terms of both planning efficiency and dose distribution quality compared with the current trial and error–based IMRT planning approach.

  14. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  15. Integrated Management System in construction company-effective tool of quality, environment and safety level improving

    OpenAIRE

    Gašparík, Jozef

    2009-01-01

    Contribution Presents the struCture of integrated M anageMent systeM ( iMs) according to international standards ISO 9001:2008, ISO 14001:2004 and STN OHSAS 18001:2009, which consists of 3 management systems focused to quality, environment and safety of building processes. The purpose of paper is to describe basic steps concerning the development of IMS. Paper analises basic processes of IMS like company vision, IMS planning, implementing, monitoring, revive and improving. The paper presents ...

  16. Patient-specific dosimetric endpoints based treatment plan quality control in radiotherapy

    International Nuclear Information System (INIS)

    Song, Ting; Zhou, Linghong; Staub, David; Chen, Mingli; Lu, Weiguo; Tian, Zhen; Jia, Xun; Li, Yongbao; Jiang, Steve B; Gu, Xuejun

    2015-01-01

    In intensity modulated radiotherapy (IMRT), the optimal plan for each patient is specific due to unique patient anatomy. To achieve such a plan, patient-specific dosimetric goals reflecting each patient’s unique anatomy should be defined and adopted in the treatment planning procedure for plan quality control. This study is to develop such a personalized treatment plan quality control tool by predicting patient-specific dosimetric endpoints (DEs). The incorporation of patient specific DEs is realized by a multi-OAR geometry-dosimetry model, capable of predicting optimal DEs based on the individual patient’s geometry. The overall quality of a treatment plan is then judged with a numerical treatment plan quality indicator and characterized as optimal or suboptimal. Taking advantage of clinically available prostate volumetric modulated arc therapy (VMAT) treatment plans, we built and evaluated our proposed plan quality control tool. Using our developed tool, six of twenty evaluated plans were identified as sub-optimal plans. After plan re-optimization, these suboptimal plans achieved better OAR dose sparing without sacrificing the PTV coverage, and the dosimetric endpoints of the re-optimized plans agreed well with the model predicted values, which validate the predictability of the proposed tool. In conclusion, the developed tool is able to accurately predict optimally achievable DEs of multiple OARs, identify suboptimal plans, and guide plan optimization. It is a useful tool for achieving patient-specific treatment plan quality control. (paper)

  17. quality and safety characteristics of cassava crisps sold in urban

    African Journals Online (AJOL)

    ACSS

    QUALITY AND SAFETY CHARACTERISTICS OF CASSAVA CRISPS SOLD IN. URBAN KENYA. G.O. ABONG', S.I. SHIBAIRO, ... This study sought to characterise the quality and safety in terms of cyanide levels of cassava crisps ... Crantz) to food security and incomes for rural communities in sub-Saharan Africa, cannot be.

  18. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  19. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  20. Quality and safety training in primary care: making an impact.

    Science.gov (United States)

    Byrne, John M; Hall, Susan; Baz, Sam; Kessler, Todd; Roman, Maher; Patuszynski, Mark; Thakkar, Kruti; Kashner, T Michael

    2012-12-01

    Preparing residents for future practice, knowledge, and skills in quality improvement and safety (QI/S) is a requisite element of graduate medical education. Despite many challenges, residency programs must consider new curricular innovations to meet the requirements. We report the effectiveness of a primary care QI/S curriculum and the role of the chief resident in quality and patient safety in facilitating it. Through the Veterans Administration Graduate Medical Education Enhancement Program, we added a position for a chief resident in quality and patient safety, and 4 full-time equivalent internal medicine residents, to develop the Primary Care Interprofessional Patient-Centered Quality Care Training Curriculum. The curriculum includes a first-or second-year, 1-month block rotation that serves as a foundational experience in QI/S and interprofessional care. The responsibilities of the chief resident in quality and patient safety included organizing and teaching the QI/S curriculum and mentoring resident projects. Evaluation included prerotation and postrotation surveys of self-assessed QI/S knowledge, abilities, skills, beliefs, and commitment (KASBC); an end-of-the-year KASBC; prerotation and postrotation knowledge test; and postrotation and faculty surveys. Comparisons of prerotation and postrotation KASBC indicated significant self-assessed improvements in 4 of 5 KASBC domains: knowledge (P < .001), ability (P < .001), skills (P < .001), and belief (P < .03), which were sustained on the end-of-the-year survey. The knowledge test demonstrated increased QI/S knowledge (P  =  .002). Results of the postrotation survey indicate strong satisfaction with the curriculum, with 76% (25 of 33) and 70% (23 of 33) of the residents rating the quality and safety curricula as always or usually educational. Most faculty members acknowledged that the chief resident in quality and patient safety enhanced both faculty and resident QI/S interest and

  1. 42 CFR 460.132 - Quality assessment and performance improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assessment and performance improvement plan... assessment and performance improvement plan. (a) Basic rule. A PACE organization must have a written quality assessment and performance improvement plan. (b) Annual review. The PACE governing body must review the plan...

  2. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  3. Quality assurance in the planning and construction of components for nuclear power plants and large chemical plants

    International Nuclear Information System (INIS)

    Doerling

    1975-01-01

    High safety technical requirements must be demanded of the components of these plants to avoid economical hazards and to protect life and health. These requirements necessitate that each phase of the task completion, i.e. in planning, construction, fabrication and assembly, be carried out systematically and totally in order to produce a component with optimum quality. Quality assurance cannot then merely be a quality control in a conventional sense carried out during fabrication. It is much more an aimed procedure which is oriented to the functional requirements of the components - or rather to the function carrier. The concept presented on the quality assurance gives me the right as a constructor to treat this subject. (orig./LH) [de

  4. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  5. Quality-assurance and data-management plan for water-quality activities in the Kansas Water Science Center, 2014

    Science.gov (United States)

    Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.

    2014-01-01

    As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.

  6. An integrated approach to hospital strategic planning, quality assurance, and continuous quality improvement.

    Science.gov (United States)

    Day, G; Gardner, S; Herba, C

    1995-01-01

    Like many other healthcare organizations today, the authors' facility, a 306-bed acute care community hospital in Michigan, strives to visualize and make a transition from traditional quality assurance to continuous quality improvement. The Juran Trilogy provided the insight that strategic planning, measurement, and continuous improvement must exist side by side. At the authors' facility, this realization resulted in the hospital quality plan, which treats each of these components as part of the foundation for quality. The authors explain this model and the reporting and communication mechanisms that support it.

  7. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    Energy Technology Data Exchange (ETDEWEB)

    Poole, D A

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA).

  8. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    International Nuclear Information System (INIS)

    Poole, D.A.

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA)

  9. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  10. Transuranic Waste Characterization Quality Assurance Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  11. Transuranic Waste Characterization Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    1995-01-01

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes

  12. Plan-provider integration, premiums, and quality in the Medicare Advantage market.

    Science.gov (United States)

    Frakt, Austin B; Pizer, Steven D; Feldman, Roger

    2013-12-01

    To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.

  13. The role of quality management in safety case development - Nagra's experience

    International Nuclear Information System (INIS)

    Schneider, Juerg W.; Zuidema, Piet

    2014-01-01

    This paper discusses the role of quality management (QM) in safety case development based on Nagra's experience from a broad range of projects. These include Project Gewahr (L/ILW and HLW, Nagra, 1985), the Wellenberg Project (L/ILW, Nagra, 1994), Project Opalinus Clay (HLW, Nagra, 2002a, 2002b), and recent project work needed in the context of the Swiss site selection process (L/ILW and HLW, Nagra, 2008a, 2008b, 2008c, 2010). Broadly speaking, Nagra's Quality Management policy is focused on ensuring: i) the quality of the disposal system (siting, design and implementation); ii) the quality of the underlying scientific understanding, which are seen as key elements of a credible safety case, along with the quality of the safety calculations themselves and of compiling the safety case, including the drawing of conclusions (Nagra, 2002a). All aspects of QM discussed in this paper should be seen in this context. (authors)

  14. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  15. Software quality assurance plan for PORFLOW-3D

    International Nuclear Information System (INIS)

    Maheras, S.J.

    1993-03-01

    This plan describes the steps taken by the Idaho National Engineering Laboratory Subsurface and Environmental Modeling Unit personnel to implement software quality assurance procedures for the PORFLOW-3D computer code. PORFLOW-3D was used to conduct radiological performance assessments at the Savannah River Site. software quality assurance procedures for PORFLOW-3D include software acquisition, installation, testing, operation, maintenance, and retirement. Configuration control and quality assurance procedures are also included or referenced in this plan

  16. Documenting Quality Improvement and Patient Safety Efforts: The Quality Portfolio. A Statement from the Academic Hospitalist Taskforce

    OpenAIRE

    Taylor, Benjamin B.; Parekh, Vikas; Estrada, Carlos A.; Schleyer, Anneliese; Sharpe, Bradley

    2013-01-01

    Physicians increasingly investigate, work, and teach to improve the quality of care and safety of care delivery. The Society of General Internal Medicine Academic Hospitalist Task Force sought to develop a practical tool, the quality portfolio, to systematically document quality and safety achievements. The quality portfolio was vetted with internal and external stakeholders including national leaders in academic medicine. The portfolio was refined for implementation to include an outlined fr...

  17. Safety implications of standardized continuous quality improvement programs in community pharmacy.

    Science.gov (United States)

    Boyle, Todd A; Ho, Certina; Mackinnon, Neil J; Mahaffey, Thomas; Taylor, Jeffrey M

    2013-06-01

    Standardized continuous quality improvement (CQI) programs combine Web-based technologies and standardized improvement processes, tools, and expectations to enable quality-related events (QREs) occurring in individual pharmacies to be shared with pharmacies in other jurisdictions. Because standardized CQI programs are still new to community pharmacy, little is known about how they impact medication safety. This research identifies key aspects of medication safety that change as a result of implementing a standardized CQI program. Fifty-three community pharmacies in Nova Scotia, Canada, adopted the SafetyNET-Rx standardized CQI program in April 2010. The Institute for Safe Medication Practices (ISMP) Canada's Medication Safety Self-Assessment (MSSA) survey was administered to these pharmacies before and 1 year into their use of the SafetyNET-Rx program. The nonparametric Wilcoxon signed-rank test was used to explore where changes in patient safety occurred as a result of SafetyNETRx use. Significant improvements occurred with quality processes and risk management, staff competence, and education, and communication of drug orders and other information. Patient education, environmental factors, and the use of devices did not show statistically significant changes. As CQI programs are designed to share learning from QREs, it is reassuring to see that the largest improvements are related to quality processes, risk management, staff competence, and education.

  18. Westinghouse Water Reactor Divisions quality assurance plan

    International Nuclear Information System (INIS)

    1977-09-01

    The Quality Assurance Program used by Westinghouse Water Reactor Divisions is described. The purpose of the program is to assure that the design, materials, and workmanship on Nuclear Steam Supply System (NSSS) equipment meet applicable safety requirements, fulfill the requirements of the contracts with the applicants, and satisfy the applicable codes, standards, and regulatory requirements. This program satisfies the NRC Quality Assurance Criteria, 10CFR50 Appendix B, to the extent that these criteria apply to safety related NSSS equipment. Also, it follows the regulatory position provided in NRC regulatory guides and the requirements of ANSI Standard N45.2.12 as identified in this Topical Report

  19. Standard review plan for reviewing safety analysis reports for dry metallic spent fuel storage casks

    International Nuclear Information System (INIS)

    1988-01-01

    The Cask Standard Review Plan (CSRP) has been prepared as guidance to be used in the review of Cask Safety Analysis Reports (CSARs) for storage packages. The principal purpose of the CSRP is to assure the quality and uniformity of storage cask reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The CSRP also sets forth solutions and approaches determined to be acceptable in the past by the NRC staff in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a CSAR does not have to follow the solutions or approaches presented in the CSRP. However, applicants should recognize that the NRC staff has spent substantial time and effort in reviewing and developing their positions for the issues. A corresponding amount of time and effort will probably be required to review and accept new or different solutions and approaches

  20. Quality and Safety Education for Nurses (QSEN): The Key is Systems Thinking.

    Science.gov (United States)

    Dolansky, Mary A; Moore, Shirley M

    2013-09-30

    Over a decade has passed since the Institute of Medicine's reports on the need to improve the American healthcare system, and yet only slight improvement in quality and safety has been reported. The Quality and Safety Education for Nurses (QSEN) initiative was developed to integrate quality and safety competencies into nursing education. The current challenge is for nurses to move beyond the application of QSEN competencies to individual patients and families and incorporate systems thinking in quality and safety education and healthcare delivery. This article provides a history of QSEN and proposes a framework in which systems thinking is a critical aspect in the application of the QSEN competencies. We provide examples of how using this framework expands nursing focus from individual care to care of the system and propose ways to teach and measure systems thinking. The conclusion calls for movement from personal effort and individual care to a focus on care of the system that will accelerate improvement of healthcare quality and safety.

  1. SU-C-BRD-05: Implementation of Incident Learning in the Safety and Quality Management of Radiotherapy: The Primary Experience in a New Established Program with Advanced Techniques

    Energy Technology Data Exchange (ETDEWEB)

    Yang, R; Wang, J [Peking University Third Hospital, Beijing, Beijing (China)

    2014-06-15

    Purpose: To explore the implementation and effectiveness of incident learning for the safety and quality of radiotherapy in a new established radiotherapy program with advanced technology. Methods: Reference to the consensus recommendations by American Association of Physicist in Medicine, an incident learning system was specifically designed for reporting, investigating, and learning of individual radiotherapy incidents in a new established radiotherapy program, with 4D CBCT, Ultrasound guided radiotherapy, VMAT, gated treatment delivered on two new installed linacs. The incidents occurring in external beam radiotherapy from February, 2012 to January, 2014 were reported. Results: A total of 33 reports were analyzed, including 28 near misses and 5 incidents. Among them, 5 originated in imaging for planning, 25 in planning, 1 in plan transfer, 1 in commissioning and 1 in treatment delivery. Among them, three near misses originated in the safety barrier of the radiotherapy process. In terms of error type, 1 incident was classified as wrong patient, 7 near misses/incidents as wrong site, 6 as wrong laterality, 5 as wrong dose, 7 as wrong prescription, and 7 as suboptimal plan quality. 5 incidents were all classified as grade 1/2 of dosimetric severity, 1 as grade 0, and the other 4 as grade 1 of medical severity. For the causes/contributory factors, negligence, policy not followed, inadequate training, failure to develop an effective plan, and communication contributed to 19, 15, 12, 5 and 3 near misses/incidents, respectively. The average incident rate per 100 patients treated was 0.4; this rate fell to 0.28% in the second year from 0.56% in the first year. The rate of near miss fell to 1.24% from 2.22%. Conclusion: Effective incident learning can reduce the occurrence of near miss/incidents, enhance the culture of safety. Incident learning is an effective proactive method for improving the quality and safety of radiotherapy.

  2. SU-C-BRD-05: Implementation of Incident Learning in the Safety and Quality Management of Radiotherapy: The Primary Experience in a New Established Program with Advanced Techniques

    International Nuclear Information System (INIS)

    Yang, R; Wang, J

    2014-01-01

    Purpose: To explore the implementation and effectiveness of incident learning for the safety and quality of radiotherapy in a new established radiotherapy program with advanced technology. Methods: Reference to the consensus recommendations by American Association of Physicist in Medicine, an incident learning system was specifically designed for reporting, investigating, and learning of individual radiotherapy incidents in a new established radiotherapy program, with 4D CBCT, Ultrasound guided radiotherapy, VMAT, gated treatment delivered on two new installed linacs. The incidents occurring in external beam radiotherapy from February, 2012 to January, 2014 were reported. Results: A total of 33 reports were analyzed, including 28 near misses and 5 incidents. Among them, 5 originated in imaging for planning, 25 in planning, 1 in plan transfer, 1 in commissioning and 1 in treatment delivery. Among them, three near misses originated in the safety barrier of the radiotherapy process. In terms of error type, 1 incident was classified as wrong patient, 7 near misses/incidents as wrong site, 6 as wrong laterality, 5 as wrong dose, 7 as wrong prescription, and 7 as suboptimal plan quality. 5 incidents were all classified as grade 1/2 of dosimetric severity, 1 as grade 0, and the other 4 as grade 1 of medical severity. For the causes/contributory factors, negligence, policy not followed, inadequate training, failure to develop an effective plan, and communication contributed to 19, 15, 12, 5 and 3 near misses/incidents, respectively. The average incident rate per 100 patients treated was 0.4; this rate fell to 0.28% in the second year from 0.56% in the first year. The rate of near miss fell to 1.24% from 2.22%. Conclusion: Effective incident learning can reduce the occurrence of near miss/incidents, enhance the culture of safety. Incident learning is an effective proactive method for improving the quality and safety of radiotherapy

  3. RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  4. 76 FR 55056 - Toy Safety Standard: Strategic Outreach and Education Plan

    Science.gov (United States)

    2011-09-06

    ... to test and certify to the toy safety standard. We plan to use traditional and social media to... testing and certification requirements for children's toys and toy chests and their compliance with ASTM... manufacturers of children's toys must ensure that covered toys are tested for compliance with the toy safety...

  5. 12 CFR 263.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... member bank will take to correct the deficiency and the time within which those steps will be taken. (c... FEDERAL RESERVE SYSTEM RULES OF PRACTICE FOR HEARINGS Submission and Review of Safety and Soundness... safety and soundness compliance plan. (a) Schedule for filing compliance plan—(1) In general. A State...

  6. Selenide isotope generator for the Galileo Mission: safety test plan

    International Nuclear Information System (INIS)

    1979-01-01

    The intent of this safety test plan is to outline particular kinds of safety tests designed to produce information which would be useful in the safety analysis process. The program deals primarily with the response of the RTG to accident environments; accordingly two criteria were established: (1) safety tests should be performed for environments which are the most critical in terms of risk contribution; and (2) tests should be formulated to determine failure conditions for critical heat source components rather than observe heat source response in reference accident environments. To satisfy criterion 1. results of a recent safety study were used to rank various accidents in terms of expected source terms. Six kinds of tests were then proposed which would provide information meeting the second criterion

  7. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  8. Consumer perception of meat quality and safety

    DEFF Research Database (Denmark)

    Brunsø, Karen; Grunert, Klaus G.; Bredahl, Lone

    2003-01-01

    The evaluation of meat quality and safety is not an easy task for consumers. In this article, the Total Food Quality Model will be introduced as a framework for understanding how consumers perceive meat quality, and results from a Danish study dealing with consumer perception and experience of beef...... will be presented. Consumers form expectations about the eating quality of meat at the point of purchase, based on prior experience and information available in the shopping environment, while the eating quality is experienced in the home during and after meal preparation. Results show that consumers have...... difficulty in evaluating meat quality, resulting in uncertainty and dissatisfaction, and reveal a need for educating consumers about evaluating eating quality during shopping....

  9. A tailored online safety and health intervention for women experiencing intimate partner violence: the iCAN Plan 4 Safety randomized controlled trial protocol

    Directory of Open Access Journals (Sweden)

    Marilyn Ford-Gilboe

    2017-03-01

    Full Text Available Abstract Background Intimate partner violence (IPV threatens the safety and health of women worldwide. Safety planning is a widely recommended, evidence-based intervention for women experiencing IPV, yet fewer than 1 in 5 Canadian women access safety planning through domestic violence services. Rural, Indigenous, racialized, and immigrant women, those who prioritize their privacy, and/or women who have partners other than men, face unique safety risks and access barriers. Online IPV interventions tailored to the unique features of women’s lives, and to maximize choice and control, have potential to reduce access barriers, and improve fit and inclusiveness, maximizing effectiveness of these interventions for diverse groups. Methods/Design In this double blind randomized controlled trial, 450 Canadian women who have experienced IPV in the previous 6 months will be randomized to either a tailored, interactive online safety and health intervention (iCAN Plan 4 Safety or general online safety information (usual care. iCAN engages women in activities designed to increase their awareness of safety risks, reflect on their plans for their relationships and priorities, and create a personalize action plan of strategies and resources for addressing their safety and health concerns. Self-reported outcome measures will be collected at baseline and 3, 6, and 12 months post-baseline. Primary outcomes are depressive symptoms (Center for Epidemiological Studies Depression Scale, Revised and PTSD Symptoms (PTSD Checklist, Civilian Version. Secondary outcomes include helpful safety actions, safety planning self-efficacy, mastery, and decisional conflict. In-depth qualitative interviews with approximately 60 women who have completed the trial and website utilization data will be used to explore women’s engagement with the intervention and processes of change. Discussion This trial will contribute timely evidence about the effectiveness of online safety and

  10. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time

    Energy Technology Data Exchange (ETDEWEB)

    Wild, Esther, E-mail: e.wild@dkfz.de; Bangert, Mark [Department of Medical Physics in Radiation Oncology, German Cancer Research Center, Im Neuenheimer Feld 280, D-69120 Heidelberg (Germany); Nill, Simeon [Joint Department of Physics at The Institute of Cancer Research and The Royal Marsden NHS Foundation Trust, London SM2 5NG (United Kingdom); Oelfke, Uwe [Joint Department of Physics at The Institute of Cancer Research and The Royal Marsden NHS Foundation Trust, London SM2 5NG, United Kingdom and Department of Medical Physics in Radiation Oncology, German Cancer Research Center, Im Neuenheimer Feld 280, D-69120 Heidelberg (Germany)

    2015-05-15

    Purpose: The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. Methods: For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directions and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. Results: VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable

  11. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time

    International Nuclear Information System (INIS)

    Wild, Esther; Bangert, Mark; Nill, Simeon; Oelfke, Uwe

    2015-01-01

    Purpose: The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. Methods: For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directions and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. Results: VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable

  12. Explicit optimization of plan quality measures in intensity-modulated radiation therapy treatment planning.

    Science.gov (United States)

    Engberg, Lovisa; Forsgren, Anders; Eriksson, Kjell; Hårdemark, Björn

    2017-06-01

    To formulate convex planning objectives of treatment plan multicriteria optimization with explicit relationships to the dose-volume histogram (DVH) statistics used in plan quality evaluation. Conventional planning objectives are designed to minimize the violation of DVH statistics thresholds using penalty functions. Although successful in guiding the DVH curve towards these thresholds, conventional planning objectives offer limited control of the individual points on the DVH curve (doses-at-volume) used to evaluate plan quality. In this study, we abandon the usual penalty-function framework and propose planning objectives that more closely relate to DVH statistics. The proposed planning objectives are based on mean-tail-dose, resulting in convex optimization. We also demonstrate how to adapt a standard optimization method to the proposed formulation in order to obtain a substantial reduction in computational cost. We investigated the potential of the proposed planning objectives as tools for optimizing DVH statistics through juxtaposition with the conventional planning objectives on two patient cases. Sets of treatment plans with differently balanced planning objectives were generated using either the proposed or the conventional approach. Dominance in the sense of better distributed doses-at-volume was observed in plans optimized within the proposed framework. The initial computational study indicates that the DVH statistics are better optimized and more efficiently balanced using the proposed planning objectives than using the conventional approach. © 2017 American Association of Physicists in Medicine.

  13. Role of a quality management system in improving patient safety - laboratory aspects.

    Science.gov (United States)

    Allen, Lynn C

    2013-09-01

    The aim of this study is to describe how implementation of a quality management system (QMS) based on ISO 15189 enhances patient safety. A literature review showed that several European hospitals implemented a QMS based on ISO 9001 and assessed the impact on patient safety. An Internet search showed that problems affecting patient safety have occurred in a number of laboratories across Canada. The requirements of a QMS based on ISO 15189 are outlined, and the impact of the implementation of each requirement on patient safety is summarized. The Quality Management Program - Laboratory Services in Ontario is briefly described, and the experience of Ontario laboratories with Ontario Laboratory Accreditation, based on ISO 15189, is outlined. Several hospitals that implemented ISO 9001 reported either a positive impact or no impact on patient safety. Patient safety problems in Canadian laboratories are described. Implementation of each requirement of the QMS can be seen to have a positive effect on patient safety. Average laboratory conformance on Ontario Laboratory Accreditation is very high, and laboratories must address and resolve any nonconformities. Other standards, practices, and quality requirements may also contribute to patient safety. Implementation of a QMS based on ISO 15189 provides a solid foundation for quality in the laboratory and enhances patient safety. It helps to prevent patient safety issues; when such issues do occur, effective processes are in place for investigation and resolution. Patient safety problems in Canadian laboratories might have been prevented had effective QMSs been in place. Ontario Laboratory Accreditation has had a positive impact on quality in Ontario laboratories. Copyright © 2013 The Canadian Society of Clinical Chemists. Published by Elsevier Inc. All rights reserved.

  14. Safety evaluation report on Tennessee Valley Authority: Watts Bar Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1990-01-01

    This safety evaluation report on the information submitted by the Tennessee Valley Authority in its Nuclear Performance Plan for the Watts Bar Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific corrective actions as part of the recovery program for licensing of Unit 1. The staff will be monitoring and inspecting the implementation of the programs. The plan does not address all licensing matters that will be required for fuel load and operation of Unit 1. Those remaining licensing matters have been addressed in previous safety evaluations or will be addressed in accordance with routing NRC licensing practices. 97 refs

  15. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP... PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a.... (iii) Appropriate improvements to control methods. (iv) Other steps appropriate to correct control...

  16. Is it necessary to plan with safety margins for actively scanned proton therapy?

    Science.gov (United States)

    Albertini, F.; Hug, E. B.; Lomax, A. J.

    2011-07-01

    In radiation therapy, a plan is robust if the calculated and the delivered dose are in agreement, even in the case of different uncertainties. The current practice is to use safety margins, expanding the clinical target volume sufficiently enough to account for treatment uncertainties. This, however, might not be ideal for proton therapy and in particular when using intensity modulated proton therapy (IMPT) plans as degradation in the dose conformity could also be found in the middle of the target resulting from misalignments of highly in-field dose gradients. Single field uniform dose (SFUD) and IMPT plans have been calculated for different anatomical sites and the need for margins has been assessed by analyzing plan robustness to set-up and range uncertainties. We found that the use of safety margins is a good way to improve plan robustness for SFUD and IMPT plans with low in-field dose gradients but not necessarily for highly modulated IMPT plans for which only a marginal improvement in plan robustness could be detected through the definition of a planning target volume.

  17. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  18. Safety versus Security in the Quality Calculus

    DEFF Research Database (Denmark)

    Nielson, Hanne Riis; Nielson, Flemming

    2013-01-01

    Safety and security are both needed for ensuring that cyber-physical systems live up to expectations, but often an intelligent trade-off is called for, because sometimes it is impossible to obtain optimal safety at the same time as optimal security. In the context of the Quality Calculus we develop...... a type system for checking the extent to which safety and security goals have been met. Safety goals include showing that certain error configurations are in fact not reachable and hence do not require intelligent error handling. Security goals include showing that highly trusted communications can only...... of the implicit flow). This is illustrated on a worked example taken from the automotive sector and we conclude with a discussion of the theoretical properties of the type system....

  19. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  20. Quality of Family Planning Services in Primary Health Centers of ...

    African Journals Online (AJOL)

    Background: Good quality of care in family planning (FP) services help individuals and couples to meet their reproductive health needs safely and effectively. Therefore, assessment and improvement of the quality of family planning services could enhance family planning services utilization. This study was thus conducted ...

  1. 12 CFR 570.3 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... compliance plan shall include a description of the steps the savings association will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance... plan. (a) Schedule for filing compliance plan—(1) In general. A savings association shall file a...

  2. Planning and Preparing for Emergency Response to Transport Accidents Involving Radioactive Material. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide provides guidance on various aspects of emergency planning and preparedness for dealing effectively and safely with transport accidents involving radioactive material, including the assignment of responsibilities. It reflects the requirements specified in Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, and those of Safety Series No. 115, International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. Contents: 1. Introduction; 2. Framework for planning and preparing for response to accidents in the transport of radioactive material; 3. Responsibilities for planning and preparing for response to accidents in the transport of radioactive material; 4. Planning for response to accidents in the transport of radioactive material; 5. Preparing for response to accidents in the transport of radioactive material; Appendix I: Features of the transport regulations influencing emergency response to transport accidents; Appendix II: Preliminary emergency response reference matrix; Appendix III: Guide to suitable instrumentation; Appendix IV: Overview of emergency management for a transport accident involving radioactive material; Appendix V: Examples of response to transport accidents; Appendix VI: Example equipment kit for a radiation protection team; Annex I: Example of guidance on emergency response to carriers; Annex II: Emergency response guide.

  3. Improving health care quality and safety: the role of collective learning.

    Science.gov (United States)

    Singer, Sara J; Benzer, Justin K; Hamdan, Sami U

    2015-01-01

    Despite decades of effort to improve quality and safety in health care, this goal feels increasingly elusive. Successful examples of improvement are infrequently replicated. This scoping review synthesizes 76 empirical or conceptual studies (out of 1208 originally screened) addressing learning in quality or safety improvement, that were published in selected health care and management journals between January 2000 and December 2014 to deepen understanding of the role that collective learning plays in quality and safety improvement. We categorize learning activities using a theoretical model that shows how leadership and environmental factors support collective learning processes and practices, and in turn team and organizational improvement outcomes. By focusing on quality and safety improvement, our review elaborates the premise of learning theory that leadership, environment, and processes combine to create conditions that promote learning. Specifically, we found that learning for quality and safety improvement includes experimentation (including deliberate experimentation, improvisation, learning from failures, exploration, and exploitation), internal and external knowledge acquisition, performance monitoring and comparison, and training. Supportive learning environments are characterized by team characteristics like psychological safety, appreciation of differences, openness to new ideas social motivation, and team autonomy; team contextual factors including learning resources like time for reflection, access to knowledge, organizational capabilities; incentives; and organizational culture, strategy, and structure; and external environmental factors including institutional pressures, environmental dynamism and competitiveness and learning collaboratives. Lastly learning in the context of quality and safety improvement requires leadership that reinforces learning through actions and behaviors that affect people, such as coaching and trust building, and through

  4. Food safety and total quality management

    NARCIS (Netherlands)

    Barendsz, A.W.

    1998-01-01

    Food safety is a growing global concern not only because of its continuing importance for public health but also because of its impact on international trade. The application of total quality management (TQM) provides the best possible care by continuously improving products and services to meet or

  5. FOCUS: the Society of Cardiovascular Anesthesiologists' initiative to improve quality and safety in the cardiovascular operating room.

    Science.gov (United States)

    Barbeito, Atilio; Lau, William Travis; Weitzel, Nathaen; Abernathy, James H; Wahr, Joyce; Mark, Jonathan B

    2014-10-01

    The Society of Cardiovascular Anesthesiologists (SCA) introduced the FOCUS initiative (Flawless Operative Cardiovascular Unified Systems) in 2005 in response to the need for a rigorous scientific approach to improve quality and safety in the cardiovascular operating room (CVOR). The goal of the project, which is supported by the SCA Foundation, is to identify hazards and develop evidence-based protocols to improve cardiac surgery safety. A hazard is anything that has the potential to cause a preventable adverse event. Specifically, the strategic plan of FOCUS includes 3 goals: (1) identifying hazards in the CVOR, (2) prioritizing hazards and developing risk-reduction interventions, and (3) disseminating these interventions. Collectively, the FOCUS initiative, through the work of several groups composed of members from different disciplines such as clinical medicine, human factors engineering, industrial psychology, and organizational sociology, has identified and documented significant hazards occurring daily in our CVORs. Some examples of frequent occurrences that contribute to reduce the safety and quality of care provided to cardiac surgery patients include deficiencies in teamwork, poor OR design, incompatible technologies, and failure to adhere to best practices. Several projects are currently under way that are aimed at better understanding these hazards and developing interventions to mitigate them. The SCA, through the FOCUS initiative, has begun this journey of science-driven improvement in quality and safety. There is a long and arduous road ahead, but one we need to continue to travel.

  6. Management of safety and quality and the relationship with employee decisions in country grain elevators.

    Science.gov (United States)

    Mosher, G A; Keren, N; Freeman, S A; Hurburgh, C R

    2012-07-01

    Human factors play an important role in the management of safety and quality in an agricultural work environment. Although employee actions and decisions have been identified as a key component of successful occupational safety programs and quality management programs, little attention has been given to the employees' role in these types of programs. This research explored two safety relationships that have theoretical connections but little previous research: the relationship between safety climate and quality climate, and the relationship of the safety and quality climates between the organizational level and the group level within a workplace. Survey data were collected at three commercial grain handling facilities from 177 employees. Employees also participated in safety and quality decision-making simulations. Significant positive predictions were noted for safety and quality climate. Decision-making predictions are also discussed. This research suggests that organizational safety is an important predictor of group safety. In addition, recognizing the larger role that supervisors play in group workplace behavior, more should be done to increase employee perceptions of group-level involvement in quality climate to promote more quality-oriented decision-making by employees.

  7. Integration of air quality-related planning processes : report

    International Nuclear Information System (INIS)

    2004-05-01

    Several communities in British Columbia have conducted air quality, greenhouse gas, or community energy management plans. This report explored the possibility of integrating 3 community-based air quality-related planning processes into a single process and evaluated the use of these 3 processes by local governments and First Nations in identifying and addressing air quality-related objectives, and determined to what extent they could be integrated to achieve planning objectives for air quality, greenhouse gas emissions, and energy supply and conservation. The lessons learned from 9 case studies in British Columbia were presented. The purpose of the case studies was to examine how communities handled emissions and energy related inventory and planning work, as well as their experiences with, or considerations for, an integrated process. The lessons were grouped under several key themes including organization and stakeholder involvement; messaging and focus; leadership/champions; and resources and capacity. The report also outlined a framework for an integrated planning process and provided recommendations regarding how an integrated or complementary process could be performed. A number of next steps were also offered for the provincial government to move the concept of an integrated process forward with the assistance of other partners. These included identifying the resources required to support communities engaging in an integrated process as well as discussing the series of options for provincial support with key stakeholders. refs., tabs., figs

  8. 76 FR 7854 - Patient Safety Organizations: Voluntary Delisting From Quality Excellence, Inc./PSO

    Science.gov (United States)

    2011-02-11

    ... Arkansas Foundation for Medical Care, of its status as a Patient Safety Organization (PSO). The Patient Safety and Quality Improvement Act of 2005 (Patient Safety Act), Public Law 109-41, 42 U.S.C. 299b-21--b... DEPARTMENT OF HEALTH AND HUMAN SERVICES Agency for Healthcare Research and Quality Patient Safety...

  9. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  10. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  11. Study on Food Quality and Safety Management Based on Hotel Management

    Directory of Open Access Journals (Sweden)

    Shi Zengye

    2017-12-01

    Full Text Available In recent years, with the frequent occurrence of food safety problems, people have begun to pay attention to food safety, especially the food safety of hotels. This paper proposed a Hazard Analysis and Critical Control Point (HACCP management system to analyze food safety issues of hotels in order to improve the food quality and safety in hotel management. Through the practical application of the HACCP management system in the hotel catering industry, it was found that the amount of bacteria greatly reduced and the pass rate of tableware disinfection increased significantly in the hotel's food processing links, while customer satisfaction greatly improved. Therefore, the HACCP management system had great applicability in improving the food quality and safety of hotels.

  12. Diabetes Health Information Technology Innovation to Improve Quality of Life for Health Plan Members in Urban Safety Net

    Science.gov (United States)

    Ratanawongsa, Neda; Handley, Margaret A.; Sarkar, Urmimala; Quan, Judy; Pfeifer, Kelly; Soria, Catalina; Schillinger, Dean

    2014-01-01

    Safety net systems need innovative diabetes self-management programs for linguistically diverse patients. A low-income government-sponsored managed care plan implemented a 27-week automated telephone self-management support (ATSM) / health coaching intervention for English, Spanish-, and Cantonese-speaking members from four publicly-funded clinics in a practice-based research network. Compared to waitlist, immediate intervention participants had greater 6-month improvements in overall diabetes self-care behaviors (standardized effect size [ES] 0.29, pimproving patient-reported self-management and may also improve some outcomes. PMID:24594561

  13. Urban planning, traffic planning and traffic safety of pedestrians and cyclists : report presented to the 1979 Road Research Symposium on Safety of Pedestrians and Cyclists, OECD Headquarters, Paris, 14-16 May 1979. Session III: Physical Countermeasures; Subsession III.1: Urban planning and traffic planning.

    NARCIS (Netherlands)

    Wegman, F.C.M.

    1979-01-01

    The traffic safety of pedestrians and cyclists can be improved by means of urban planning and traffic planning, as one of the possibilities. This paper discusses the framework of these measures and activities and also the effects on the field of traffic planning. Chapter I show that it is not

  14. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... Indiana State Implementation Plan (SIP) for lead (Pb) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES...

  15. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... the Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the Clean Air Act. On April 8, 2009, and...

  16. 38 CFR 17.155 - Minimum standards of safety and quality for automotive adaptive equipment.

    Science.gov (United States)

    2010-07-01

    ... safety and quality for automotive adaptive equipment. 17.155 Section 17.155 Pensions, Bonuses, and... Minimum standards of safety and quality for automotive adaptive equipment. (a) The Under Secretary for... officials that it meets implicit standards of safety and quality adopted by the industry or as later...

  17. 77 FR 42738 - Patient Safety Organizations: Voluntary Relinquishment From the Coalition for Quality and Patient...

    Science.gov (United States)

    2012-07-20

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Agency for Healthcare Research and Quality Patient Safety Organizations: Voluntary Relinquishment From the Coalition for Quality and Patient Safety of Chicagoland (CQPS.... SUMMARY: The Patient Safety and Quality Improvement Act of 2005 (Patient Safety Act), Public Law 109-41,42...

  18. Oak Ridge National Laboratory Environmenal, Safety, and Health Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The 1990 Tiger Team Appraisal of Oak Ridge National Laboratory (ORNL) revealed that neither Martin Marietta Energy Systems, Inc. (Energy Systems) nor ORNL had a strategic plan for Environmental, Safety, and Health (ES ampersand H) activities. There were no detailed plans describing ORNL's mission, objectives, and strategies for ES ampersand H activities. A number of plans do exist that cover various aspects of ES ampersand H. Their scope ranges from multiyear program plans to annual audit schedules to compliance plans to action plans from specific audits. However, there is not a single document that identifies the plans and the objectives they are to address. This document describes the strategic plan for ORNL and provides the linkage among existing plans. It gives a brief description of the organization and management of ES ampersand H activities at ORNL. The plan identifies the general strategies to be taken by ORNL, using the overall guidance from Energy Systems in its corporate ES ampersand H Strategic Plan. It also identifies more detailed plans for implementation of these strategies, where appropriate

  19. A Total Quality-Control Plan with Right-Sized Statistical Quality-Control.

    Science.gov (United States)

    Westgard, James O

    2017-03-01

    A new Clinical Laboratory Improvement Amendments option for risk-based quality-control (QC) plans became effective in January, 2016. Called an Individualized QC Plan, this option requires the laboratory to perform a risk assessment, develop a QC plan, and implement a QC program to monitor ongoing performance of the QC plan. Difficulties in performing a risk assessment may limit validity of an Individualized QC Plan. A better alternative is to develop a Total QC Plan including a right-sized statistical QC procedure to detect medically important errors. Westgard Sigma Rules provides a simple way to select the right control rules and the right number of control measurements. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  1. Waste convention regulatory impact on planning safety assessment for LILW disposal in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Lokner, V.

    2000-01-01

    Preparations for establishment of a LILW repository in Croatia have reached a point where a preliminary safety assessment for the prospective facility is being planned. The planning is not based upon the national regulatory framework, which does not require such an assessment at this early stage, but upon the interagency BSS and the IAEA RADWASS programme recommendations because the national regulations are being revised with express purpose to conform to the most recent international standards and good practices. The Waste Convention, which Croatia has ratified in the meantime, supports this approach in principle, but does not appear to have more tangible regulatory relevance for the safety assessment planning. Its actual requirements regarding safety analyses for a repository fall short of the specific assessment concepts practiced in this decade, and could have well been met by the old Croatian regulations from the mid-eighties. (author)

  2. Evaluating which plan quality metrics are appropriate for use in lung SBRT.

    Science.gov (United States)

    Yaparpalvi, Ravindra; Garg, Madhur K; Shen, Jin; Bodner, William R; Mynampati, Dinesh K; Gafar, Aleiya; Kuo, Hsiang-Chi; Basavatia, Amar K; Ohri, Nitin; Hong, Linda X; Kalnicki, Shalom; Tome, Wolfgang A

    2018-02-01

    Several dose metrics in the categories-homogeneity, coverage, conformity and gradient have been proposed in literature for evaluating treatment plan quality. In this study, we applied these metrics to characterize and identify the plan quality metrics that would merit plan quality assessment in lung stereotactic body radiation therapy (SBRT) dose distributions. Treatment plans of 90 lung SBRT patients, comprising 91 targets, treated in our institution were retrospectively reviewed. Dose calculations were performed using anisotropic analytical algorithm (AAA) with heterogeneity correction. A literature review on published plan quality metrics in the categories-coverage, homogeneity, conformity and gradient was performed. For each patient, using dose-volume histogram data, plan quality metric values were quantified and analysed. For the study, the radiation therapy oncology group (RTOG) defined plan quality metrics were: coverage (0.90 ± 0.08); homogeneity (1.27 ± 0.07); conformity (1.03 ± 0.07) and gradient (4.40 ± 0.80). Geometric conformity strongly correlated with conformity index (p plan quality guidelines-coverage % (ICRU 62), conformity (CN or CI Paddick ) and gradient (R 50% ). Furthermore, we strongly recommend that RTOG lung SBRT protocols adopt either CN or CI Padddick in place of prescription isodose to target volume ratio for conformity index evaluation. Advances in knowledge: Our study metrics are valuable tools for establishing lung SBRT plan quality guidelines.

  3. Integrated maintenance planning in manufacturing systems

    CERN Document Server

    Al-Turki, Umar M; Yilbas, Bekir Sami; Sahin, Ahmet Ziyaettin

    2014-01-01

    This book introduces the concept of integrated planning for maintenance and production taken into account quality and safety for high global socio-economic impact. It provides insight into the planning process at a global level starting from the business level and ending with the operational level where the plan is implemented and controlled.

  4. SU-D-BRD-07: Automatic Patient Data Audit and Plan Quality Check to Support ARIA and Eclipse

    Energy Technology Data Exchange (ETDEWEB)

    Li, X; Li, H; Wu, Y; Mutic, S; Yang, D [Washington University School of Medicine, St. Louis, MO (United States)

    2014-06-01

    Purpose: To ensure patient safety and treatment quality in RT departments that use Varian ARIA and Eclipse, we developed a computer software system and interface functions that allow previously developed electron chart checking (EcCk) methodologies to support these Varian systems. Methods: ARIA and Eclipse store most patient information in its MSSQL database. We studied the contents in the hundreds database tables and identified the data elements used for patient treatment management and treatment planning. Interface functions were developed in both c-sharp and MATLAB to support data access from ARIA and Eclipse servers using SQL queries. These functions and additional data processing functions allowed the existing rules and logics from EcCk to support ARIA and Eclipse. Dose and structure information are important for plan quality check, however they are not stored in the MSSQL database but as files in Varian private formats, and cannot be processed by external programs. We have therefore implemented a service program, which uses the DB Daemon and File Daemon services on ARIA server to automatically and seamlessly retrieve dose and structure data as DICOM files. This service was designed to 1) consistently monitor the data access requests from EcCk programs, 2) translate the requests for ARIA daemon services to obtain dose and structure DICOM files, and 3) monitor the process and return the obtained DICOM files back to EcCk programs for plan quality check purposes. Results: EcCk, which was previously designed to only support MOSAIQ TMS and Pinnacle TPS, can now support Varian ARIA and Eclipse. The new EcCk software has been tested and worked well in physics new start plan check, IMRT plan integrity and plan quality checks. Conclusion: Methods and computer programs have been implemented to allow EcCk to support Varian ARIA and Eclipse systems. This project was supported by a research grant from Varian Medical System.

  5. SU-D-BRD-07: Automatic Patient Data Audit and Plan Quality Check to Support ARIA and Eclipse

    International Nuclear Information System (INIS)

    Li, X; Li, H; Wu, Y; Mutic, S; Yang, D

    2014-01-01

    Purpose: To ensure patient safety and treatment quality in RT departments that use Varian ARIA and Eclipse, we developed a computer software system and interface functions that allow previously developed electron chart checking (EcCk) methodologies to support these Varian systems. Methods: ARIA and Eclipse store most patient information in its MSSQL database. We studied the contents in the hundreds database tables and identified the data elements used for patient treatment management and treatment planning. Interface functions were developed in both c-sharp and MATLAB to support data access from ARIA and Eclipse servers using SQL queries. These functions and additional data processing functions allowed the existing rules and logics from EcCk to support ARIA and Eclipse. Dose and structure information are important for plan quality check, however they are not stored in the MSSQL database but as files in Varian private formats, and cannot be processed by external programs. We have therefore implemented a service program, which uses the DB Daemon and File Daemon services on ARIA server to automatically and seamlessly retrieve dose and structure data as DICOM files. This service was designed to 1) consistently monitor the data access requests from EcCk programs, 2) translate the requests for ARIA daemon services to obtain dose and structure DICOM files, and 3) monitor the process and return the obtained DICOM files back to EcCk programs for plan quality check purposes. Results: EcCk, which was previously designed to only support MOSAIQ TMS and Pinnacle TPS, can now support Varian ARIA and Eclipse. The new EcCk software has been tested and worked well in physics new start plan check, IMRT plan integrity and plan quality checks. Conclusion: Methods and computer programs have been implemented to allow EcCk to support Varian ARIA and Eclipse systems. This project was supported by a research grant from Varian Medical System

  6. Annual plan of research on safety techniques against low level radioactive wastes, FY1994-FY1999

    International Nuclear Information System (INIS)

    1994-01-01

    The safety research on the disposal of low level radioactive waste has been promoted based on the annual plan decided by the committee on radiative waste safety regulation of the Nuclear Safety Commission. Hereafter, the disposal of low level radioactive waste in ocean is never selected. As to the subjects of the safety research which should be carried out for five years from 1994, the necessity, the contents of research, the organs that carry out the research and so on were deliberated, and the results are made into the annual plan, therefore, it is reported. The way of thinking on the safety research, the contents for which efforts should be exerted as the safety research, and the matters to which attention should be paid are shown. As for the annual plan of safety research, the necessity and the outline of the safety research on the disposal in strata, the concrete subjects and their contents, and the necessity and the outline of the safety research on the reuse, the concrete subjects and their contents are reported. The radioactive waste is those produced by the operation of nuclear reactor facilities, those containing TRU nuclides and RI waste. (K.I.)

  7. IOT for Agriculture: Food Quality and Safety

    Science.gov (United States)

    Witjaksono, Gunawan; Abdelkreem Saeed Rabih, Almur; Yahya, Noorhana bt; Alva, Sagir

    2018-03-01

    Food is the main energy source for the living beings; as such food quality and safety have been in the highest demand throughout the human history. Internet of things (IOT) is a technology with a vision to connect anything at anytime and anywhere. Utilizing IOT in the food supply chain (FSC) is believed to enhance the quality of life by tracing and tracking the food conditions and live-sharing the obtained data with the consumers or the FSC supervisors. Currently, full application of IOT in the FSC is still in the developing stage and there is a big gap for improvements. The purpose of this paper is to explore the possibility of applying IOT for agriculture to trace and track food quality and safety. Mobile application for food freshness investigation was successfully developed and the results showed that consumer mobile camera could be used to test the freshness of food. By applying the IOT technology this information could be shared with all the consumers and also the supervisors.

  8. National nuclear power plant safety research 2011-2014. SAFIR2014 framework plan

    International Nuclear Information System (INIS)

    2010-01-01

    A country utilising nuclear energy is presumed to possess a sufficient infrastructure to cover the education and research in this field, besides the operating organisations of the plants and a regulatory body. The starting point of public nuclear safety research programmes is that they provide the necessary conditions for retaining the knowledge needed for ensuring the continuance of safe and economic use of nuclear power, for development of new know-how and for participation in international cooperation. In fact, the Finnish organisations engaged in research in this sector have been an important resource which the various ministries, the Radiation and Nuclear Safety Authority (STUK) and the power companies have had at their disposal. Ministry of employment and the economy appointed a group to write the Framework Plan of the new programme. This report contains a proposal for the general outline of the programme, entitled as SAFIR2014 (SAfety of Nuclear Power Plants - Finnish National Research Programme). The plan has been made for the period 2011-2014, but it is based on safety challenges identified for a longer time span as well. Olkiluoto 3, the new nuclear power plant unit under construction and new decisions-in-principle have also been taken into account in the plan. The safety challenges set by the existing plants and the new projects, as well as the ensuing research needs do, however, converge to a great extent. The research programme is strongly based on the Chapter 7a of the Finnish Nuclear Energy Act. The construction of new power plant units will increase the need for experts in the field in Finland. At the same time, the retirement of the existing experts is continuing. These factors together will call for more education and training, in which active research activities play a key role. This situation also makes long-term safety research face a great challenge. The Framework Plan aims to define the important research needs related to the safety

  9. Radiation safety analysis and action plans for NSRRC top-up operation

    International Nuclear Information System (INIS)

    Wang, J.-P.; Sheu, R.-J.; Liu, Joseph C.; Chen, C.-R.; Chang, F.-D.; Kao, S.-P.

    2006-01-01

    This paper summarizes the radiation safety analysis and action plans for the upcoming top-up operation at the National Synchrotron Radiation Research Center (NSRRC). Electron beam loss scenarios and consequence of beam lifetime and injection efficiency have been studied. Dose assessment was conducted based on measurement and Monte Carlo simulation results. Radiation safety action plans such as upgrading the shielding of the injection section, enlarging the exclusion zones of the straight section beamlines, installing new interlock system for top-up operation and most importantly improving the injection efficiency have been scheduled. The goal is to keep present dose limit of 2 mSv/y and make top-up operation feasible at normal user's run of year 2006

  10. Design of agricultural product quality safety retrospective supervision system of Jiangsu province

    Science.gov (United States)

    Wang, Kun

    2017-08-01

    In store and supermarkets to consumers can trace back agricultural products through the electronic province card to query their origin, planting, processing, packaging, testing and other important information and found that the problems. Quality and safety issues can identify the responsibility of the problem. This paper designs a retroactive supervision system for the quality and safety of agricultural products in Jiangsu Province. Based on the analysis of agricultural production and business process, the goal of Jiangsu agricultural product quality safety traceability system construction is established, and the specific functional requirements and non-functioning requirements of the retroactive system are analyzed, and the target is specified for the specific construction of the retroactive system. The design of the quality and safety traceability system in Jiangsu province contains the design of the overall design, the trace code design and the system function module.

  11. The Role Of Quality Assurance Program For Safety Operation Of Nuclear Installations

    International Nuclear Information System (INIS)

    Harjanto, N.T.; Purwadi, K.P.; Boru, D.S.; Farida; Suharni

    2000-01-01

    Nuclear installations expose potential hazard of radiation, therefore in their construction, operation and maintenance, it is necessary to consider safety aspect, in which the safety requirements which has been determined must be met. One of the requirements that is absolutely needed is quality assurance, which covers arrangement of quality assurance program, organization and administration of the implementation of quality assurance, and supervision. Quality Assurance program is a guideline containing quality policies and basic determination on the realization of activities that effect the quality of equipment's and items used in the operation of nuclear installations in order that the operation of nuclear installation can run safety and in accordance with their design aims and operation limits. Quality Assurance Program includes document control, design control, supply control, control of equipment s and items, operation/process control, inspection and control of equipment test, and control of nonconformance and corrections. General system of nuclear installation operation is equipped with safety and supporting systems. These systems must apply the quality assurance program that cover control of activities in the systems. In the implementation of the quality assurance program, it is necessary to establish procedures, work guidelines/instructions, and quality recording that constitutes documents of quality system 2 nd , 3 th , and 4 th level after the quality assurance program. To ensure the effectivity and to prove whether the realization of the program has been pursuant to the determined requirements, an internal audit must be conducted accordingly

  12. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  13. System safety program plan for the Isotope Brayton Ground Demonstration System (phase I)

    International Nuclear Information System (INIS)

    1976-01-01

    The safety engineering effort to be undertaken in achieving an acceptable level of safety in the Brayton Isotope Power System (BIPS) development program is discussed. The safety organizational relationships, the methods to be used, the tasks to be completed, and the documentation to be published are described. The plan will be updated periodically as the need arises

  14. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... to the Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the..., Sacramento Metropolitan Air Quality Management District, Rule 214 (Federal New Source Review), Rule 203...

  15. Quality and Safety Aspects of Cereals (Wheat) and Their Products.

    Science.gov (United States)

    Varzakas, Theo

    2016-11-17

    Cereals and, most specifically, wheat are described in this chapter highlighting on their safety and quality aspects. Moreover, wheat quality aspects are adequately addressed since they are used to characterize dough properties and baking quality. Determination of dough properties is also mentioned and pasta quality is also described in this chapter. Chemometrics-multivariate analysis is one of the analyses carried out. Regarding production weighing/mixing of flours, kneading, extruded wheat flours, and sodium chloride are important processing steps/raw materials used in the manufacturing of pastry products. Staling of cereal-based products is also taken into account. Finally, safety aspects of cereal-based products are well documented with special emphasis on mycotoxins, acrylamide, and near infrared methodology.

  16. Quality assurance in dosimetry and treatment planning

    International Nuclear Information System (INIS)

    Cunningham, J.R.

    1984-01-01

    The considerations of tissue response to radiation absorbed dose suggest a need for an accuracy of +/-5% in its delivery. This is very demanding and its regular achievement requires careful quality control. There are three distinct phases to the delivery of the planned treatment: calibration of the radiation beam in a reference situation, calculation of the dose distribution for a patient relative to the reference dose and the delivery of the radiation to the patient as planned. Each has distinctly different quality assurance requirements and must be diligently observed if the desired accuracy is to be achieved

  17. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  18. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  19. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  20. Food-packaging interactions influencing quality and safety.

    Science.gov (United States)

    Hotchkiss, J H

    1997-01-01

    Interactions between foods and packaging can be detrimental to quality and/or safety. Changes in product flavour due to aroma sorption and the transfer of undesirable flavours from packaging to foods are important mechanisms of deterioration when foods are packaged in polymer-based materials. Careful consideration must be given to those factors affecting such interactions when selecting packaging materials in order to maximize product quality, safety, and shelf-life while minimizing undesirable changes. Product considerations include sensitivity to flavour and related deteriorations, colour changes, vitamin loss, microbial activity, and amount of flavour available. Storage considerations include temperature, time, and processing method. Polymer considerations include type of polymer and processing method, volume or mass of polymer to product ratio, and whether the interaction is Fickian or non-Fickian. Methodology to determine the extent of such interactions must be developed. Direct interactions between food and packaging are not necessarily detrimental. The same principles governing undesirable interactions can be used to affect desirable outcomes. Examples include films which directly intercept or absorb oxygen, inhibit microorganisms, remove undesirable flavours by sorption, or indicate safety and product shelf-life.

  1. Minnesota urban partnership agreement national evaluation : safety data test plan.

    Science.gov (United States)

    2009-11-17

    This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...

  2. Sexual Safety Planning as an HIV Prevention Strategy for Survivors of Domestic Violence.

    Science.gov (United States)

    Foster, Jill; Núñez, Ana; Spencer, Susan; Wolf, Judith; Robertson-James, Candace

    2016-06-01

    Victims of domestic violence (DV) are not only subject to physical and emotional abuse but may also be at increased risk for less recognized dangers from infection with human immunodeficiency virus (HIV) and other sexually transmitted pathogens. Because of the close link between DV and sexual risk, women need to be educated about the consequences of acquiring a life-threatening sexually transmitted infection, risk reduction measures, and how to access appropriate HIV services for diagnosis and treatment. It is therefore critical for DV workers to receive sufficient training about the link between DV and HIV risk so that sexual safety planning can be incorporated into activities with their clients in the same way as physical safety plans. In this article, we discuss how the Many Hands Working Together project provides interactive training for workers in DV and DV-affiliated agencies to increase their knowledge about HIV and teach sexual safety planning skills to achieve HIV risk reduction.

  3. Air Pollution Monitoring | Air Quality Planning & Standards ...

    Science.gov (United States)

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. To accomplish this, OAQPS must be able to evaluate the status of the atmosphere as compared to clean air standards and historical information.

  4. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  5. Quality and safety implications of emergency department information systems.

    Science.gov (United States)

    Farley, Heather L; Baumlin, Kevin M; Hamedani, Azita G; Cheung, Dickson S; Edwards, Michael R; Fuller, Drew C; Genes, Nicholas; Griffey, Richard T; Kelly, John J; McClay, James C; Nielson, Jeff; Phelan, Michael P; Shapiro, Jason S; Stone-Griffith, Suzanne; Pines, Jesse M

    2013-10-01

    The Health Information Technology for Economic and Clinical Health Act of 2009 and the Centers for Medicare & Medicaid Services "meaningful use" incentive programs, in tandem with the boundless additional requirements for detailed reporting of quality metrics, have galvanized hospital efforts to implement hospital-based electronic health records. As such, emergency department information systems (EDISs) are an important and unique component of most hospitals' electronic health records. System functionality varies greatly and affects physician decisionmaking, clinician workflow, communication, and, ultimately, the overall quality of care and patient safety. This article is a joint effort by members of the Quality Improvement and Patient Safety Section and the Informatics Section of the American College of Emergency Physicians. The aim of this effort is to examine the benefits and potential threats to quality and patient safety that could result from the choice of a particular EDIS, its implementation and optimization, and the hospital's or physician group's approach to continuous improvement of the EDIS. Specifically, we explored the following areas of potential EDIS safety concerns: communication failure, wrong order-wrong patient errors, poor data display, and alert fatigue. Case studies are presented that illustrate the potential harm that could befall patients from an inferior EDIS product or suboptimal execution of such a product in the clinical environment. The authors have developed 7 recommendations to improve patient safety with respect to the deployment of EDISs. These include ensuring that emergency providers actively participate in selection of the EDIS product, in the design of processes related to EDIS implementation and optimization, and in the monitoring of the system's ongoing success or failure. Our recommendations apply to emergency departments using any type of EDIS: custom-developed systems, best-of-breed vendor systems, or enterprise systems

  6. Health and safety plan for characterization sampling of ETR and MTR facilities

    International Nuclear Information System (INIS)

    Baxter, D.E.

    1994-10-01

    This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational Safety and Health Administration standard, 29 CFR 1910.120. It contains information about the hazards involved in performing the tasks, and the specific actions and equipment that will be used to protect persons working at the site

  7. Linking customer satisfaction, quality, and strategic planning

    OpenAIRE

    Reis, Dayr; Peña, Leticia

    2000-01-01

    By acknowledging and dissecting the interconnected roles of customer satisfaction, quality, and strategic planning, this paper provides an analytical framework for creating a customer-driven organization and culture. It shows how quality starts and ends with the customer. Companies that are achieving long-term continuous improvement in quality tailored to customer satisfaction possess lasting characteristics such as customer orientation, customer consciousness, and customer responsiveness. In...

  8. Improving health care quality and safety: the role of collective learning

    Directory of Open Access Journals (Sweden)

    Singer SJ

    2015-11-01

    Full Text Available Sara J Singer,1–4 Justin K Benzer,4–6 Sami U Hamdan4,6 1Department of Health Policy and Management, Harvard T.H. Chan School of Public Health, Boston, MA, USA; 2Department of Medicine, Harvard Medical School, Boston, MA, USA; 3Mongan Institute for Health Policy, Massachusetts General Hospital, Boston, MA, USA; 4Center for Healthcare Organization and Implementation Research, VA Boston Healthcare System, Boston, MA, USA; 5VISN 17 Center of Excellence for Research on Returning War Veterans, Waco, TX, USA; 6Department of Health Policy and Management, Boston University School of Public Health, Boston, MA, USA Abstract: Despite decades of effort to improve quality and safety in health care, this goal feels increasingly elusive. Successful examples of improvement are infrequently replicated. This scoping review synthesizes 76 empirical or conceptual studies (out of 1208 originally screened addressing learning in quality or safety improvement, that were published in selected health care and management journals between January 2000 and December 2014 to deepen understanding of the role that collective learning plays in quality and safety improvement. We categorize learning activities using a theoretical model that shows how leadership and environmental factors support collective learning processes and practices, and in turn team and organizational improvement outcomes. By focusing on quality and safety improvement, our review elaborates the premise of learning theory that leadership, environment, and processes combine to create conditions that promote learning. Specifically, we found that learning for quality and safety improvement includes experimentation (including deliberate experimentation, improvisation, learning from failures, exploration, and exploitation, internal and external knowledge acquisition, performance monitoring and comparison, and training. Supportive learning environments are characterized by team characteristics like psychological

  9. 78 FR 979 - Petition for Positive Train Control Safety Plan Approval and System Certification of the...

    Science.gov (United States)

    2013-01-07

    ...] Petition for Positive Train Control Safety Plan Approval and System Certification of the Electronic Train... the Federal Railroad Administration (FRA) for Positive Train Control (PTC) Safety Plan (PTCSP) approval and system certification of the Electronic Train Management System (ETMS) as required by 49 U.S.C...

  10. Embedding soil quality in land-use planning

    NARCIS (Netherlands)

    Wezel AP van; Weijden AGG van der; Wijnen HJ van; Mulder Ch; Wijnen HJ van; MNP; LER; LDL

    2006-01-01

    Changes in land use in the Netherlands are anticipated on a large scale. Soil quality, however, hardly plays a role in spatial planning, which was reason enough to analyse the relationship between land use and soil quality on a national scale using ecological data. Despite major changes in land

  11. National Ignition Facility quality assurance plan for laser materials and optical technology

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials & Optical Technology (LM&OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM&OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies.

  12. National Ignition Facility quality assurance plan for laser materials and optical technology

    International Nuclear Information System (INIS)

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials ampersand Optical Technology (LM ampersand OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM ampersand OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies

  13. Jefferson Proving Ground, South of the Firing Line Health and Safety Plan, Volume 4

    National Research Council Canada - National Science Library

    1992-01-01

    .... The purpose of this Site Health and Safety Plan (SHSP) is to assign SECD personnel health and safety responsibilities, to prescribe mandatory operating procedures, and to establish personal-protective-equipment (PPE...

  14. Factors impacting on the microbiological quality and safety of ...

    African Journals Online (AJOL)

    hope&shola

    2010-12-06

    Dec 6, 2010 ... microbiological quality and safety of processed hake. Samples were collected along the processing line; the general microbiological quality (mesophylic and psychrotrophic aerobic plate counts), total. Vibrio species and common fish spoilage bacterial counts were performed. The results constantly showed ...

  15. Study on the Problems and Countermeasure in the Animal Products Quality and Safety

    Institute of Scientific and Technical Information of China (English)

    Shishan; WANG

    2013-01-01

    As the supply chain of animal products is long,there are many factors which would influence the quality safety of animal production.Therefore,by focusing on the present and having a vision for future,Jiaozuo government promulgated Ten Polices on the Food Safety in Jiaozuo City,which pushed forward the technological development,intensified measures to monitor the quality of animal products,set up a series of mechanism,and provided reference for the food quality and safety monitoring.

  16. A semi-automated tool for treatment plan-quality evaluation and clinical trial quality assurance

    Science.gov (United States)

    Wang, Jiazhou; Chen, Wenzhou; Studenski, Matthew; Cui, Yunfeng; Lee, Andrew J.; Xiao, Ying

    2013-07-01

    The goal of this work is to develop a plan-quality evaluation program for clinical routine and multi-institutional clinical trials so that the overall evaluation efficiency is improved. In multi-institutional clinical trials evaluating the plan quality is a time-consuming and labor-intensive process. In this note, we present a semi-automated plan-quality evaluation program which combines MIMVista, Java/MATLAB, and extensible markup language (XML). More specifically, MIMVista is used for data visualization; Java and its powerful function library are implemented for calculating dosimetry parameters; and to improve the clarity of the index definitions, XML is applied. The accuracy and the efficiency of the program were evaluated by comparing the results of the program with the manually recorded results in two RTOG trials. A slight difference of about 0.2% in volume or 0.6 Gy in dose between the semi-automated program and manual recording was observed. According to the criteria of indices, there are minimal differences between the two methods. The evaluation time is reduced from 10-20 min to 2 min by applying the semi-automated plan-quality evaluation program.

  17. A semi-automated tool for treatment plan-quality evaluation and clinical trial quality assurance

    International Nuclear Information System (INIS)

    Wang, Jiazhou; Chen, Wenzhou; Studenski, Matthew; Cui, Yunfeng; Xiao, Ying; Lee, Andrew J

    2013-01-01

    The goal of this work is to develop a plan-quality evaluation program for clinical routine and multi-institutional clinical trials so that the overall evaluation efficiency is improved. In multi-institutional clinical trials evaluating the plan quality is a time-consuming and labor-intensive process. In this note, we present a semi-automated plan-quality evaluation program which combines MIMVista, Java/MATLAB, and extensible markup language (XML). More specifically, MIMVista is used for data visualization; Java and its powerful function library are implemented for calculating dosimetry parameters; and to improve the clarity of the index definitions, XML is applied. The accuracy and the efficiency of the program were evaluated by comparing the results of the program with the manually recorded results in two RTOG trials. A slight difference of about 0.2% in volume or 0.6 Gy in dose between the semi-automated program and manual recording was observed. According to the criteria of indices, there are minimal differences between the two methods. The evaluation time is reduced from 10–20 min to 2 min by applying the semi-automated plan-quality evaluation program. (note)

  18. Annual plan of research on safety techniques against low level radioactive wastes, 1984-1988

    International Nuclear Information System (INIS)

    1984-01-01

    The establishment of the countermeasures for treating and disposing radioactive wastes has become an important subject for promoting the utilization of atomic energy. Especially as to low level radioactive wastes, the cumulative quantity has reached about 460,000 in terms of 200 l drums as of the end of March, 1983, and accompanying the development of the utilization of atomic energy, its rapid increase is expected. So far, as for the disposal of low level radioactive wastes, the research and development and the preparation of safety criteria and safety evaluation techniques have been carried out, following the basic policy of the Atomic Energy Commission to execute land disposal and ocean disposal in combination, first to make the test disposal after preliminary safety evaluation, and to shift to the full scale disposal based on the results. The annual plan was decided on July 22, 1983, and the first revision was carried out this time, therefore, it is reported here. The basic policy of establishing this annual plan, and the annual plan for safety technique research are described. (Kako, I.)

  19. PLANNING THE QUALITY OF LIFE FOR TIMISOARA GROWTH POLE

    Directory of Open Access Journals (Sweden)

    Cătălina-Livia POPA

    2014-06-01

    Full Text Available This paper aims to show that planning the quality of life at local level through economic development can be a new approach for policy makers and community in improving quality of life. In this purpose, the Quality Function Deployment (QFD model will be use to planning the quality of life and to identify the main directions of economic development to support improving the quality of life at the level of Timisoara Growth Pole from Romania. The dimensions of quality of life are analyzed starting from the point of view of inhabitants. The results include a new approach in which the dimensions of quality of life are the key element that orients economic development in order to improve the quality of life of human being. The case study results refer to the main elements of quality of life at Timisoara Growth Pole and the relevant directions of economic development to improve the quality of life for Timisoara Growth Pole.

  20. Impact of Performance Obstacles on Intensive Care Nurses‘ Workload, Perceived Quality and Safety of Care, and Quality of Working Life

    Science.gov (United States)

    Gurses, Ayse P; Carayon, Pascale; Wall, Melanie

    2009-01-01

    Objectives To study the impact of performance obstacles on intensive care nurses‘ workload, quality and safety of care, and quality of working life (QWL). Performance obstacles are factors that hinder nurses‘ capacity to perform their job and that are closely associated with their immediate work system. Data Sources/Study Setting Data were collected from 265 nurses in 17 intensive care units (ICUs) between February and August 2004 via a structured questionnaire, yielding a response rate of 80 percent. Study Design A cross-sectional study design was used. Data were analyzed by correlation analyses and structural equation modeling. Principal Findings Performance obstacles were found to affect perceived quality and safety of care and QWL of ICU nurses. Workload mediated the impact of performance obstacles with the exception of equipment-related issues on perceived quality and safety of care as well as QWL. Conclusions Performance obstacles in ICUs are a major determinant of nursing workload, perceived quality and safety of care, and QWL. In general, performance obstacles increase nursing workload, which in turn negatively affect perceived quality and safety of care and QWL. Redesigning the ICU work system to reduce performance obstacles may improve nurses‘ work. PMID:19207589

  1. Data quality objective to support resolution of the organic complexant safety issue

    International Nuclear Information System (INIS)

    Turner, D.A.; Babad, H.; Buckley, L.L.; Meacham, J.E.

    1995-01-01

    This document records the data quality objectives (DQO) process applied to the organic complexant safety issue at the Hanford Site. Two important outputs of this particular DQO application were the following: (1) decision rules for categorizing organic tanks; and (2) analytical requirements that feed into the tank-specific characterization plans. The decision rules developed in this DQO allow the organic tanks to be categorized as safe, conditionally safe, or unsafe based on fuel and moisture concentrations. Then analytical requirements from this DQO process fall into two groups, primary and secondary. The primary data requirements are always applied, while the secondary requirements are only necessary on those half segment samples that violate the fuel and moisture decision rules or that propagate during adiabatic calorimetry testing

  2. Waste Management Project Quality Assurance Program Plan (QAPP)

    International Nuclear Information System (INIS)

    HORHOTA, M.J.

    2000-01-01

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence

  3. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  4. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  5. Safety of timber : An analysis of quality control options

    NARCIS (Netherlands)

    Kovryga, A.; Stapel, P.; Van de Kuilen, J.W.G.

    2014-01-01

    The quality assurance of timber properties is important for the safety of timber structures. In the current study, the quality control options of timber are analysed under the prism of the different growth regions. Therefore, these options - machine and output control - are simulated in accordance

  6. Identification of training and emergency-planning needs through job-safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Veltrie, J.

    1987-01-01

    Training and emergency-planning needs within the photovoltaic industry may be more accurately determined through the performance of detailed job-safety analysis. This paper outlines the four major components of such an analysis, namely operational review, hazards evaluation, personnel review and resources evaluation. It then shows how these may be developed into coherent training and planning recommendations, for both emergency and non-emergency situations.

  7. A Scholarly Pathway in Quality Improvement and Patient Safety.

    Science.gov (United States)

    Ferguson, Catherine C; Lamb, Geoffrey

    2015-10-01

    There are several challenges to teaching quality improvement (QI) and patient safety material to medical students, as successful programs should combine didactic and experiential teaching methods, integrate the material into the preclinical and clinical years, and tailor the material to the schools' existing curriculum. The authors describe the development, implementation, and assessment of the Quality Improvement and Patient Safety (QuIPS) Scholarly Pathway-a faculty-mentored, three-year experience for students interested in gaining exposure to QI and patient safety concepts at the Medical College of Wisconsin (MCW). The QuIPS pathway capitalized on the existing structure of scholarly pathways for MCW medical students, allowing QI and patient safety to be incorporated into the existing curriculum using didactic and experiential instruction and spanning preclinical and clinical education. Student reaction to the QuIPS pathway has been favorable. Preliminary data demonstrate that student knowledge as measured by the Quality Improvement Knowledge Assessment Tool significantly increased after the first year of implementation. A novel curriculum such as the QuIPS pathway provides an important opportunity to develop and test new assessment tools for curricula in systems-based practice and practice-based learning and improvement. The authors also hope that by bringing together local QI and patient safety experts and stakeholders during the curricular development process, they have laid the groundwork for the creation of a more pervasive curriculum that will reach all MCW students in the future. The model may be generalizable to other U.S. medical schools with scholarly pathways as well.

  8. Perinatal staff perceptions of safety and quality in their service.

    Science.gov (United States)

    Sinni, Suzanne V; Wallace, Euan M; Cross, Wendy M

    2014-11-28

    Ensuring safe and appropriate service delivery is central to a high quality maternity service. With this in mind, over recent years much attention has been given to the development of evidence-based clinical guidelines, staff education and risk reporting systems. Less attention has been given to assessing staff perceptions of a service's safety and quality and what factors may influence that. In this study we set out to assess staff perceptions of safety and quality of a maternity service and to explore potential influences on service safety. The study was undertaken within a new low risk metropolitan maternity service in Victoria, Australia with a staffing profile comprising midwives (including students), neonatal nurses, specialist obstetricians, junior medical staff and clerical staff. In depth open-ended interviews using a semi-structured questionnaire were conducted with 23 staff involved in the delivery of perinatal care, including doctors, midwives, nurses, nursing and midwifery students, and clerical staff. Data were analyzed using naturalistic interpretive inquiry to identify emergent themes. Staff unanimously reported that there were robust systems and processes in place to maintain safety and quality. Three major themes were apparent: (1) clinical governance, (2) dominance of midwives, (3) inter-professional relationships. Overall, there was a strong sense that, at least in this midwifery-led service, midwives had the greatest opportunity to be an influence, both positively and negatively, on the safe delivery of perinatal care. The importance of understanding team dynamics, particularly mutual respect, trust and staff cohesion, were identified as key issues for potential future service improvement. Senior staff, particularly midwives and neonatal nurses, play central roles in shaping team behaviors and attitudes that may affect the safety and quality of service delivery. We suggest that strategies targeting senior staff to enhance their performance in

  9. Software quality assurance for safety analysis and risk management at the Savannah River Site

    International Nuclear Information System (INIS)

    Ades, M.J.; Toffer, H.; Crowe, R.D.

    1991-01-01

    As part of its Reactor Operations Improvement Program at the Savannah River Site (SRS), Westinghouse Savannah River Company (WSRC), in cooperation with the Westinghouse Hanford Company, has developed and implemented quality assurance for safety-related software for technical programs essential to the safety and reliability of reactor operations. More specifically, the quality assurance process involved the development and implementation of quality standards and attendant procedures based on industry software quality standards. These procedures were then applied to computer codes in reactor safety and probabilistic risk assessment analyses. This paper provides a review of the major aspects of the WSRC safety-related software quality assurance. In particular, quality assurance procedures are described for the different life cycle phases of the software that include the Requirements, Software Design and Implementation, Testing and Installation, Operation and Maintenance, and Retirement Phases. For each phase, specific provisions are made to categorize the range of activities, the level of responsibilities, and the documentation needed to assure the control of the software. The software quality assurance procedures developed and implemented are evolutionary in nature, and thus, prone to further refinements. These procedures, nevertheless, represent an effective controlling tool for the development, production, and operation of safety-related software applicable to reactor safety and probabilistic risk assessment analyses

  10. Quality and safety of nuclear plants: the role of the administrative authorities

    International Nuclear Information System (INIS)

    Queniart, D.

    1977-10-01

    After specifying the notions of 'safety' and 'quality', the terms and conditions governing the intervention of the public authorities in the matter of safety of nuclear plants are described: individual permits, the establishing and application of technical rules of a general character, surveillance of the plants. The criteria and regulations guiding the evaluation of safety and quality and, in conclusion, insisting on the necessity for permanent discussions among the various organizations concerned are presented

  11. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  12. NAVIGATING A QUALITY ROUTE TO A NATIONAL SAFETY AWARD

    Energy Technology Data Exchange (ETDEWEB)

    PREVETTE SS

    2009-05-26

    Deming quality methodologies applied to safety are recognized with the National Safety Council's annual Robert W. Campbell Award. Over the last ten years, the implementation of Statistical Process Control and quality methodologies at the U.S. Department of Energy's Hanford Site have contributed to improved safety. Improvements attributed to Statistical Process Control are evidenced in Occupational Safety and Health records and documented through several articles in Quality Progress and the American Society of Safety Engineers publication, Professional Safety. Statistical trending of safety, quality, and occurrence data continues to playa key role in improving safety and quality at what has been called the world's largest environmental cleanup project. DOE's Hanford Site played a pivotal role in the nation's defense beginning in the 1940s, when it was established as part of the Manhattan Project. After more than 50 years of producing material for nuclear weapons, Hanford, which covers 586 square miles in southeastern Washington state, is now focused on three outcomes: (1) Restoring the Columbia River corridor for multiple uses; (2) Transitioning the central plateau to support long-term waste management; and (3) Putting DOE assets to work for the future. The current environmental cleanup mission faces challenges of overlapping technical, political, regulatory, environmental, and cultural interests. From Oct. 1, 1996 through Sept. 30, 2008, Fluor Hanford was a prime contractor to the Department of Energy's Richland Operations Office. In this role, Fluor Hanford managed several major cleanup activities that included dismantling former nuclear-processing facilities, cleaning up the Site's contaminated groundwater, retrieving and processing transuranic waste for shipment and disposal off-site, maintaining the Site's infrastructure, providing security and fire protection, and operating the Volpentest HAMMER Training and Education

  13. Use of plan quality degradation to evaluate tradeoffs in delivery efficiency and clinical plan metrics arising from IMRT optimizer and sequencer compromises

    Science.gov (United States)

    Wilkie, Joel R.; Matuszak, Martha M.; Feng, Mary; Moran, Jean M.; Fraass, Benedick A.

    2013-01-01

    Purpose: Plan degradation resulting from compromises made to enhance delivery efficiency is an important consideration for intensity modulated radiation therapy (IMRT) treatment plans. IMRT optimization and/or multileaf collimator (MLC) sequencing schemes can be modified to generate more efficient treatment delivery, but the effect those modifications have on plan quality is often difficult to quantify. In this work, the authors present a method for quantitative assessment of overall plan quality degradation due to tradeoffs between delivery efficiency and treatment plan quality, illustrated using comparisons between plans developed allowing different numbers of intensity levels in IMRT optimization and/or MLC sequencing for static segmental MLC IMRT plans. Methods: A plan quality degradation method to evaluate delivery efficiency and plan quality tradeoffs was developed and used to assess planning for 14 prostate and 12 head and neck patients treated with static IMRT. Plan quality was evaluated using a physician's predetermined “quality degradation” factors for relevant clinical plan metrics associated with the plan optimization strategy. Delivery efficiency and plan quality were assessed for a range of optimization and sequencing limitations. The “optimal” (baseline) plan for each case was derived using a clinical cost function with an unlimited number of intensity levels. These plans were sequenced with a clinical MLC leaf sequencer which uses >100 segments, assuring delivered intensities to be within 1% of the optimized intensity pattern. Each patient's optimal plan was also sequenced limiting the number of intensity levels (20, 10, and 5), and then separately optimized with these same numbers of intensity levels. Delivery time was measured for all plans, and direct evaluation of the tradeoffs between delivery time and plan degradation was performed. Results: When considering tradeoffs, the optimal number of intensity levels depends on the treatment

  14. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  15. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  16. Stalking: A Multidimensional Framework for Assessment and Safety Planning.

    Science.gov (United States)

    Logan, T K; Walker, Robert

    2015-09-03

    Despite the high prevalence of stalking and the risk of harm it poses to victims, arrest rates, prosecutions, and convictions for stalking continue to be low in the United States. The overall goal of this article is to introduce a multidimensional framework of stalking that adds to the current literature by (1) providing a conceptual framework consistent with legal elements of many stalking statutes to facilitate assessment, communication, documentation, and safety planning for stalking several victims; (2) introducing a more systematic way of assessing course of conduct and the context of fear in stalking situations in order to increase the understanding of cumulative fear for stalking victims; (3) emphasizing the aspects of stalking harm that go beyond violence and that show how harm from stalking accumulates over time including life sabotage; and (4) discussing 12 risk factors derived from the overall multidimensional framework that can be used to describe the big picture of stalking and to facilitate safety planning for victims. Implications for future research are discussed. © The Author(s) 2015.

  17. Process quality planning of quality function deployment for carrot syrup

    Science.gov (United States)

    Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon

    2017-06-01

    Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.

  18. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

    Energy Technology Data Exchange (ETDEWEB)

    Turgeon, Jennifer L.; Minana, Molly A.; Hackney, Patricia; Pilch, Martin M.

    2009-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and the software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.

  19. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  20. Role of quality assurance in reactor safety

    International Nuclear Information System (INIS)

    Roedel, J.A.

    1975-01-01

    A quality assurance program based on common sense, designed to accomplish what is reasonable and necessary, giving proper consideration to safety and economics can be an effective and essential management tool for the design, construction and operation of safe and economical nuclear power plants

  1. Health and Safety Management Plan for the Plutonium Stabilization and Packaging System

    International Nuclear Information System (INIS)

    1996-01-01

    This Health and Safety Management Plan (HSMP) presents safety and health policies and a project health and safety organizational structure designed to minimize potential risks of harm to personnel performing activities associated with Plutonium Stabilization and Packaging System (Pu SPS). The objectives of the Pu SPS are to design, fabricate, install, and startup of a glovebox system for the safe repackaging of plutonium oxides and metals, with a requirement of a 50-year storage period. This HSMP is intended as an initial project health and safety submittal as part of a three phase effort to address health and safety issues related to personnel working the Pu SPS project. Phase 1 includes this HSMP and sets up the basic approach to health and safety on the project and addresses health and safety issues related to the engineering and design effort. Phase 2 will include the Site Specific Construction health and Safety Plan (SSCHSP). Phase 3 will include an additional addendum to this HSMP and address health and safety issues associated with the start up and on-site test phase of the project. This initial submittal of the HSMP is intended to address those activities anticipated to be performed during phase 1 of the project. This HSMP is intended to be a living document which shall be modified as information regarding the individual tasks associated with the project becomes available. These modifications will be in the form of addenda to be submitted prior to the initiation of each phase of the project. For additional work authorized under this project this HSMP will be modified as described in section 1.4

  2. Quality Assurance Program Plan for the Waste Sampling and Characterization Facility

    International Nuclear Information System (INIS)

    Grabbe, R.R.

    1995-01-01

    The objective of this Quality Assurance Plan is to provide quality assurance (QA) guidance, implementation of regulatory QA requirements, and quality control (QC) specifications for analytical service. This document follows the Department of Energy (DOE)-issued Hanford Analytical Services Quality Assurance Plan (HASQAP) and additional federal [10 US Code of Federal Regulations (CFR) 830.120] QA requirements that HASQAP does not cover. This document describes how the laboratory implements QA requirements to meet the federal or state requirements, provides what are the default QC specifications, and/or identifies the procedural information that governs how the laboratory operates. In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. This document also covers QA elements that are required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAPPs), (QAMS-004), and Interim Guidelines and Specifications for Preparing Quality Assurance Product Plans (QAMS-005) from the Environmental Protection Agency (EPA). A QA Index is provided in the Appendix A

  3. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  4. Gas generation matrix depletion quality assurance project plan

    International Nuclear Information System (INIS)

    1998-01-01

    The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP)

  5. Safety in times of crises - the importance of industrial emergency plans

    International Nuclear Information System (INIS)

    Rademacher, H.; Schulten, R.

    1989-01-01

    Technical and organizational precautions cannot always avoid everyday risks such as accidents, fire, explosions, and other critical situations which without appropriate countermeasures can easily develop into emergencies. While in recent years considerable efforts have been going into improving the technical safety of industrial plants particularly susceptible to accidents (e.g. the nuclear and chemical industry), organizational safety seems to have been neglected. An analysis of different accidents reveals human fallibility rather than technical failures to be causing damage in many cases. Industrial emergency plans are considered to be contributing to the improvement of organizational safety. (orig.) [de

  6. The Nordic programme for nuclear safety 1990-1993. Plan for 1993

    International Nuclear Information System (INIS)

    1993-04-01

    In 1993 the fourth Nordic Nuclear Safety Research programme will be concluded with final reports on all of the eighteen projects. Each report will contain the results of the work carried out which has taken four years to complete and, at the same time, give a more general survey of the Northern countries' competence within the fields of emergency readiness in situations of abnormal radiation, radioactive waste and its disposal, radioecology and nuclear reactor safety - accessibility of appropriate information. Some of the reports will be published in the form of reference books or in the form of databases of direct assistance to the authorities. A number of seminars will be held so that the results and professional level of the reports can be discussed. The coordinators' and project leaders' plans for these activities are presented with the the amounts of money that project organizers have asked the Nordic Nuclear Safety Research programme to finance them with. During 1993 the plans for the programme starting in 1994 must be laid, and future researchers, project leaders, involved organizations and sponsors determined. (AB)

  7. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  8. 222-S laboratory quality assurance plan

    International Nuclear Information System (INIS)

    Meznarich, H.K.

    1995-01-01

    This document provides quality assurance guidelines and quality control requirements for analytical services. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing 222-S and 222-SA analytical and quality control activities. The 222-S Laboratory provides analytical services to various clients including, but not limited to, waste characterization for the Tank Waste Remediation Systems (TWRS), waste characterization for regulatory waste treatment, storage, and disposal (TSD), regulatory compliance samples, radiation screening, process samples, and TPA samples. A graded approach is applied on the level of sample custody, QC, data verification, and data reporting to meet the specific needs of the client

  9. Food Safety and Quality Control: Hints from Proteomics

    Directory of Open Access Journals (Sweden)

    Angelo D'Alessandro

    2012-01-01

    Full Text Available Over the last decade, proteomics has been successfully applied to the study of quality control in production processes of food (including meat, wine and beer, transgenic plants and milk and food safety (screening for food-derived pathogens. Indeed, food quality and safety and their influence on the health of end consumers have growingly become a founding principle in the international agenda of health organizations. The application of proteomics in food science was at first characterized by exploratory analyses of food of various origin (bovine, swine, chicken or lamb meat, but also transgenic food such as genetically modified maize, for example and beverages (beer, wine, in parallel to the genomic and transcriptomic approaches seeking determination of quantitative trait loci. In the last few years, technical improvements such as microbial biotyping strategies have growingly allowed proteomicists to address the safety issue as well. The newly introduced technical improvements (instrumentation characterized by higher sensitivity such as mass spectrometers have paved the way for the individuation of food-contaminating pathogens in a fast and efficient workflow which is mandatory in industrial food production chains.

  10. Preparing a Safety Analysis Report using the building block approach

    International Nuclear Information System (INIS)

    Herrington, C.C.

    1990-01-01

    The credibility of the applicant in a licensing proceeding is severely impacted by the quality of the license application, particularly the Safety Analysis Report. To ensure the highest possible credibility, the building block approach was devised to support the development of a quality Safety Analysis Report. The approach incorporates a comprehensive planning scheme that logically ties together all levels of the investigation and provides the direction necessary to prepare a superior Safety Analysis Report

  11. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  12. Understanding the role of sleep quality and sleep duration in commercial driving safety.

    Science.gov (United States)

    Lemke, Michael K; Apostolopoulos, Yorghos; Hege, Adam; Sönmez, Sevil; Wideman, Laurie

    2016-12-01

    Long-haul truck drivers in the United States suffer disproportionately high injury rates. Sleep is a critical factor in these outcomes, contributing to fatigue and degrading multiple aspects of safety-relevant performance. Both sleep duration and sleep quality are often compromised among truck drivers; however, much of the efforts to combat fatigue focus on sleep duration rather than sleep quality. Thus, the current study has two objectives: (1) to determine the degree to which sleep impacts safety-relevant performance among long-haul truck drivers; and (2) to evaluate workday and non-workday sleep quality and duration as predictors of drivers' safety-relevant performance. A non-experimental, descriptive, cross-sectional design was employed to collect survey and biometric data from 260 long-haul truck drivers. The Trucker Sleep Disorders Survey was developed to assess sleep duration and quality, the impact of sleep on job performance and accident risk, and other relevant work organization characteristics. Descriptive statistics assessed work organization variables, sleep duration and quality, and frequency of engaging in safety-relevant performance while sleepy. Linear regression analyses were conducted to evaluate relationships between sleep duration, sleep quality, and work organization variables with safety composite variables. Drivers reported long work hours, with over 70% of drivers working more than 11h daily. Drivers also reported a large number of miles driven per week, with an average of 2,812.61 miles per week, and frequent violations of hours-of-service rules, with 43.8% of drivers "sometimes to always" violating the "14-h rule." Sleep duration was longer, and sleep quality was better, on non-workdays compared on workdays. Drivers frequently operated motor vehicles while sleepy, and sleepiness impacted several aspects of safety-relevant performance. Sleep quality was better associated with driving while sleepy and with job performance and concentration

  13. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  14. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  15. FURNAS activities in safety and quality assurance

    International Nuclear Information System (INIS)

    Dezordi, W.L.; Correa Filho, S.M.; Sacco, W.; Morais, L.H.G. de

    1980-01-01

    The aspects involved in the quality assurance performed by FURNAS for Nuclear Power Plant - Angra Unit I, are shown. Furnas' responsabilities in the licensing regarding reactor safety are also discussed. A summary of the computer codes used in the licensing process is given. (e.G.) [pt

  16. Improving IMRT-plan quality with MLC leaf position refinement post plan optimization

    International Nuclear Information System (INIS)

    Niu Ying; Zhang Guowei; Berman, Barry L.; Parke, William C.; Yi Byongyong; Yu, Cedric X.

    2012-01-01

    Purpose: In intensity-modulated radiation therapy (IMRT) planning, reducing the pencil-beam size may lead to a significant improvement in dose conformity, but also increase the time needed for the dose calculation and plan optimization. The authors develop and evaluate a postoptimization refinement (POpR) method, which makes fine adjustments to the multileaf collimator (MLC) leaf positions after plan optimization, enhancing the spatial precision and improving the plan quality without a significant impact on the computational burden. Methods: The authors’ POpR method is implemented using a commercial treatment planning system based on direct aperture optimization. After an IMRT plan is optimized using pencil beams with regular pencil-beam step size, a greedy search is conducted by looping through all of the involved MLC leaves to see if moving the MLC leaf in or out by half of a pencil-beam step size will improve the objective function value. The half-sized pencil beams, which are used for updating dose distribution in the greedy search, are derived from the existing full-sized pencil beams without need for further pencil-beam dose calculations. A benchmark phantom case and a head-and-neck (HN) case are studied for testing the authors’ POpR method. Results: Using a benchmark phantom and a HN case, the authors have verified that their POpR method can be an efficient technique in the IMRT planning process. Effectiveness of POpR is confirmed by noting significant improvements in objective function values. Dosimetric benefits of POpR are comparable to those of using a finer pencil-beam size from the optimization start, but with far less computation and time. Conclusions: The POpR is a feasible and practical method to significantly improve IMRT-plan quality without compromising the planning efficiency.

  17. WE-G-BRA-01: Patient Safety and Treatment Quality Improvement Through Incident Learning: Experience of a Non-Academic Proton Therapy Center

    Energy Technology Data Exchange (ETDEWEB)

    Zheng, Y; Johnson, R; Zhao, L; Ramirez, E; Rana, S; Singh, H; Chacko, M [Procure Proton Therapy Center, Oklahoma City, OK (United States)

    2015-06-15

    Purpose: Incident learning has been proven to improve patient safety and treatment quality in conventional radiation therapy. However, its application in proton therapy has not been reported yet to our knowledge. In this study, we report our experience in developing and implementation of an in-house incident learning system. Methods: An incident learning system was developed based on published principles and tailored for our clinical practice and available resource about 18 months ago. The system includes four layers of error detection and report: 1) dosimetry peer review; 2) physicist plan quality assurance (QA); 3) treatment delivery issue on call and record; and 4) other incident report. The first two layers of QA and report were mandatory for each treatment plan through easy-to-use spreadsheets that are only accessible by the dosimetry and physicist departments. The treatment delivery issues were recorded case by case by the on call physicist. All other incidents were reported through an online incident report system, which can be anonymous. The incident report includes near misses on planning and delivery, process deviation, machine issues, work flow and documentation. Periodic incident reviews were performed. Results: In total, about 116 errors were reported through dosimetry review, 137 errors through plan QA, 83 treatment issues through physics on call record, and 30 through the online incident report. Only 8 incidents (2.2%) were considered to have a clinical impact to patients, and the rest of errors were either detected before reaching patients or had negligible dosimetric impact (<5% dose variance). Personnel training & process improvements were implemented upon periodic incident review. Conclusion: An incident learning system can be helpful in personnel training, error reduction, and patient safety and treatment quality improvement. The system needs to be catered for each clinic’s practice and available resources. Incident and knowledge sharing among

  18. WE-G-BRA-01: Patient Safety and Treatment Quality Improvement Through Incident Learning: Experience of a Non-Academic Proton Therapy Center

    International Nuclear Information System (INIS)

    Zheng, Y; Johnson, R; Zhao, L; Ramirez, E; Rana, S; Singh, H; Chacko, M

    2015-01-01

    Purpose: Incident learning has been proven to improve patient safety and treatment quality in conventional radiation therapy. However, its application in proton therapy has not been reported yet to our knowledge. In this study, we report our experience in developing and implementation of an in-house incident learning system. Methods: An incident learning system was developed based on published principles and tailored for our clinical practice and available resource about 18 months ago. The system includes four layers of error detection and report: 1) dosimetry peer review; 2) physicist plan quality assurance (QA); 3) treatment delivery issue on call and record; and 4) other incident report. The first two layers of QA and report were mandatory for each treatment plan through easy-to-use spreadsheets that are only accessible by the dosimetry and physicist departments. The treatment delivery issues were recorded case by case by the on call physicist. All other incidents were reported through an online incident report system, which can be anonymous. The incident report includes near misses on planning and delivery, process deviation, machine issues, work flow and documentation. Periodic incident reviews were performed. Results: In total, about 116 errors were reported through dosimetry review, 137 errors through plan QA, 83 treatment issues through physics on call record, and 30 through the online incident report. Only 8 incidents (2.2%) were considered to have a clinical impact to patients, and the rest of errors were either detected before reaching patients or had negligible dosimetric impact (<5% dose variance). Personnel training & process improvements were implemented upon periodic incident review. Conclusion: An incident learning system can be helpful in personnel training, error reduction, and patient safety and treatment quality improvement. The system needs to be catered for each clinic’s practice and available resources. Incident and knowledge sharing among

  19. Metro Vancouver air quality management plan : progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-10-15

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs.

  20. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  1. Metro Vancouver air quality management plan : progress report

    International Nuclear Information System (INIS)

    2008-10-01

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs

  2. 30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Safety and pollution prevention equipment... Gas Production Safety Systems § 250.806 Safety and pollution prevention equipment quality assurance... install only certified safety and pollution prevention equipment (SPPE) in wells located on the OCS. SPPE...

  3. Assessment of quality of care in family planning services in Jimma ...

    African Journals Online (AJOL)

    Background: Providing quality of care in family planning services is an important task for care providers so as to increase service utilization and coverage; however, little is known about the existing quality of care in such services. Objective: To assess quality of care in family planning services in Jimma Zone, southwest ...

  4. Plutonium stabilization and handling quality assurance program plan

    International Nuclear Information System (INIS)

    Weiss, E.V.

    1998-01-01

    This Quality Assurance Program Plan (QAPP) identifies project quality assurance requirements for all contractors involved in the planning and execution of Hanford Site activities for design, procurement, construction, testing and inspection for Project W-460, Plutonium Stabilization and Handling. The project encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM

  5. Circles of quality in radiological safety

    International Nuclear Information System (INIS)

    Gonzalez F, J.A.

    1991-01-01

    The concept of Circles of quality arose in Japan like an option to capitalize the enormous potential that the workers had developed as a result of its training in the statistical tools of quality. There are presented a series of steps that could be given with the purpose of implementing a program of ALARA circles. The radiological safety is in it finishes instance responsibility of each hard-working one and there won't be a protection program that can work among apathetic people, it is in this sense where the ALARA circles can provide its maximum contribution creating a conscience of responsibility and participation

  6. A Comprehensive Comparison of IMRT and VMAT Plan Quality for Prostate Cancer Treatment

    International Nuclear Information System (INIS)

    Quan, Enzhuo M.; Li Xiaoqiang; Li Yupeng; Wang Xiaochun; Kudchadker, Rajat J.; Johnson, Jennifer L.; Kuban, Deborah A.; Lee, Andrew K.; Zhang Xiaodong

    2012-01-01

    Purpose: We performed a comprehensive comparative study of the plan quality between volumetric-modulated arc therapy (VMAT) and intensity-modulated radiation therapy (IMRT) for the treatment of prostate cancer. Methods and Materials: Eleven patients with prostate cancer treated at our institution were randomly selected for this study. For each patient, a VMAT plan and a series of IMRT plans using an increasing number of beams (8, 12, 16, 20, and 24 beams) were examined. All plans were generated using our in-house–developed automatic inverse planning (AIP) algorithm. An existing eight-beam clinical IMRT plan, which was used to treat the patient, was used as the reference plan. For each patient, all AIP-generated plans were optimized to achieve the same level of planning target volume (PTV) coverage as the reference plan. Plan quality was evaluated by measuring mean dose to and dose–volume statistics of the organs at risk, especially the rectum, from each type of plan. Results: For the same PTV coverage, the AIP-generated VMAT plans had significantly better plan quality in terms of rectum sparing than the eight-beam clinical and AIP-generated IMRT plans (p < 0.0001). However, the differences between the IMRT and VMAT plans in all the dosimetric indices decreased as the number of beams used in IMRT increased. IMRT plan quality was similar or superior to that of VMAT when the number of beams in IMRT was increased to a certain number, which ranged from 12 to 24 for the set of patients studied. The superior VMAT plan quality resulted in approximately 30% more monitor units than the eight-beam IMRT plans, but the delivery time was still less than 3 min. Conclusions: Considering the superior plan quality as well as the delivery efficiency of VMAT compared with that of IMRT, VMAT may be the preferred modality for treating prostate cancer.

  7. Industrial Fuel Gas Demonstration Plant Program. Task III, Demonstration plant safety, industrial hygiene, and major disaster plan (Deliverable No. 35)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light, Gas and Water at Memphis, Tennessee. The plan encompasses the following areas of concern: Safety Plan Administration, Industrial Health, Industrial Safety, First Aid, Fire Protection (including fire prevention and control), and Control of Safety Related Losses. The primary objective of this plan is to achieve adequate control of all potentially hazardous activities to assure the health and safety of all employees and eliminate lost work time to both the employees and the company. The second objective is to achieve compliance with all Federal, state and local laws, regulations and codes. Some thirty specific safe practice instruction items are included.

  8. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  9. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    International Nuclear Information System (INIS)

    Jiang, S; Yang, Y; Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X

    2015-01-01

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan

  10. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, S [UT MD Anderson Cancer Center (United States); Tianjin Medical University Cancer Institute and Hospital (China); Yang, Y [UT MD Anderson Cancer Center (United States); Tianjin First Center Hospital (China); Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X [UT MD Anderson Cancer Center (United States)

    2015-06-15

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.

  11. Safety evaluation report on Tennessee Valley Authority: Browns Ferry nuclear performance plan

    International Nuclear Information System (INIS)

    1989-10-01

    This safety evaluation report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Nuclear Performance Plan, through Revision 2, for the Browns Ferry Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory commission staff. The Browns Ferry Nuclear Plant consists of three boiling-water reactors at a site in Limestone County, Alabama. The plan addresses the plant-specific concerns requiring resolution before the startup of Unit 2. The staff will inspect implementation of those TVA programs that address these concerns. Where systems are common to Units 1 and 2 or to Units 2 and 3, the staff safety evaluations of those systems are included herein. 85 refs

  12. Sci-Fri AM: Quality, Safety, and Professional Issues 01: CPQR Technical Quality Control Suite Development including Quality Control Workload Results

    Energy Technology Data Exchange (ETDEWEB)

    Malkoske, Kyle; Nielsen, Michelle; Brown, Erika; Diamond, Kevin; Frenière, Normand; Grant, John; Pomerleau-Dalcourt, Natalie; Schella, Jason; Schreiner, L. John; Tantot, Laurent; Barajas, Eduardo Villareal; Bissonnette, Jean-Pierre [Royal Victoria Hospital, Trillium Health Partners, CPQR, Juravinski Cancer Centre, CIUSSS MCQ - CHAUR, Cape Breton Health Care Complex, Centre d’oncologie Dr. Léon-Richard / Dr. Léon Richard Oncology Centre, QEII Health Sciences Centre, Cancer Centre of Southeastern Ontario, Hôpital Maisonneuve-Rosemont, Tom Baker Cancer Centre, Princess Margaret Cancer Centre (Canada)

    2016-08-15

    A close partnership between the Canadian Partnership for Quality Radiotherapy (CPQR) and the Canadian Organization of Medical Physicist’s (COMP) Quality Assurance and Radiation Safety Advisory Committee (QARSAC) has resulted in the development of a suite of Technical Quality Control (TQC) Guidelines for radiation treatment equipment, that outline specific performance objectives and criteria that equipment should meet in order to assure an acceptable level of radiation treatment quality. The framework includes consolidation of existing guidelines and/or literature by expert reviewers, structured stages of public review, external field-testing and ratification by COMP. The adopted framework for the development and maintenance of the TQCs ensures the guidelines incorporate input from the medical physics community during development, measures the workload required to perform the QC tests outlined in each TQC, and remain relevant (i.e. “living documents”) through subsequent planned reviews and updates. This presentation will show the Multi-Leaf Linear Accelerator document as an example of how feedback and cross-national work to achieve a robust guidance document. During field-testing, each technology was tested at multiple centres in a variety of clinic environments. As part of the defined feedback, workload data was captured. This lead to average time associated with testing as defined in each TQC document. As a result, for a medium-sized centre comprising 6 linear accelerators and a comprehensive brachytherapy program, we evaluate the physics workload to 1.5 full-time equivalent physicist per year to complete all QC tests listed in this suite.

  13. Sci-Fri AM: Quality, Safety, and Professional Issues 01: CPQR Technical Quality Control Suite Development including Quality Control Workload Results

    International Nuclear Information System (INIS)

    Malkoske, Kyle; Nielsen, Michelle; Brown, Erika; Diamond, Kevin; Frenière, Normand; Grant, John; Pomerleau-Dalcourt, Natalie; Schella, Jason; Schreiner, L. John; Tantot, Laurent; Barajas, Eduardo Villareal; Bissonnette, Jean-Pierre

    2016-01-01

    A close partnership between the Canadian Partnership for Quality Radiotherapy (CPQR) and the Canadian Organization of Medical Physicist’s (COMP) Quality Assurance and Radiation Safety Advisory Committee (QARSAC) has resulted in the development of a suite of Technical Quality Control (TQC) Guidelines for radiation treatment equipment, that outline specific performance objectives and criteria that equipment should meet in order to assure an acceptable level of radiation treatment quality. The framework includes consolidation of existing guidelines and/or literature by expert reviewers, structured stages of public review, external field-testing and ratification by COMP. The adopted framework for the development and maintenance of the TQCs ensures the guidelines incorporate input from the medical physics community during development, measures the workload required to perform the QC tests outlined in each TQC, and remain relevant (i.e. “living documents”) through subsequent planned reviews and updates. This presentation will show the Multi-Leaf Linear Accelerator document as an example of how feedback and cross-national work to achieve a robust guidance document. During field-testing, each technology was tested at multiple centres in a variety of clinic environments. As part of the defined feedback, workload data was captured. This lead to average time associated with testing as defined in each TQC document. As a result, for a medium-sized centre comprising 6 linear accelerators and a comprehensive brachytherapy program, we evaluate the physics workload to 1.5 full-time equivalent physicist per year to complete all QC tests listed in this suite.

  14. Transformational Leadership: The Chief Nursing Officer Role in Leading Quality and Patient Safety.

    Science.gov (United States)

    Jones, Pam; Polancich, Shea; Steaban, Robin; Feistritzer, Nancye; Poe, Terri

    This department column highlights leadership perspectives of quality and patient safety practice. The purpose of this article is to provide strategic direction for transformational quality and safety leadership as the chief nursing officer (CNO) within the academic medical center environment.

  15. Examining quality function deployment in safety promotion in Sweden.

    Science.gov (United States)

    Kullberg, Agneta; Nordqvist, Cecilia; Lindqvist, Kent; Timpka, Toomas

    2014-09-01

    The first-hand needs and demands of laypersons are not always considered when safety promotion programmes are being developed. We compared focal areas for interventions identified from residents' statements of safety needs with focal areas for interventions identified by local government professionals in a Swedish urban community certified by the international Safe Community movement supported by the World Health Organization. Quantitative and qualitative data on self-expressed safety needs from 787 housing residents were transformed into an intervention design, using the quality function deployment (QFD) technique and compared with the safety intervention programme developed by professionals at the municipality administrative office. The outcome of the comparison was investigated with regard to implications for the Safe Community movement. The QFD analysis identified the initiation and maintenance of social integrative processes in housing areas as the most highly prioritized interventions among the residents, but failed to highlight the safety needs of several vulnerable groups (the elderly, infants and persons with disabilities). The intervention programme designed by the public health professionals did not address the social integrative processes, but it did highlight the vulnerable groups. This study indicates that the QFD technique is suitable for providing residential safety promotion efforts with a quality orientation from the layperson's perspective. Views of public health professionals have to be included to ascertain that the needs of socially deprived residents are adequately taken into account. QFD can augment the methodological toolbox for safety promotion programmes, including interventions in residential areas. © The Author (2013). Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  16. 242-A Evaporator quality assurance plan. Revision 2

    International Nuclear Information System (INIS)

    Basra, T.S.

    1995-01-01

    The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (called process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks

  17. Safety evaluation report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This safety evaluation report (SER) was prepared by the US Nuclear Regulatory Commission (NRC) staff and represents the second and last supplement (SSER 2) to the staff's original SER published as Volume 3 of NUREG-1232 in April 1989. Supplement 1 of Volume 3 of NUREG-1232 (SSER 1) was published in October 1989. Like its predecessors, SSER 2 is composed of numerous safety evaluations by the staff regarding specific elements contained in the Browns Ferry Nuclear Performance Plan (BFNPP), Volume 3 (up to and including Revision 2), submitted by the Tennessee Valley Authority (TVA) for the Browns Ferry Nuclear Plant (BFN). The Browns Ferry Nuclear Plant consists of three boiling-water reactors (BWRs) at a site in Limestone County, Alabama. The BFNPP describes the corrective action plans and commitments made by TVA to resolve deficiencies with its nuclear programs before the startup of Unit 2. The staff has inspected and will continue to inspect TVA's implementation of these BFNPP corrective action plans that address staff concerns about TVA's nuclear program. SSER 2 documents the NRC staff's safety evaluations and conclusions for those elements of the BFNPP that were not previously addressed by the staff or that remained open as a result of unresolved issues identified by the staff in previous SERs and inspections

  18. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  19. Social but safe? Quality and safety of diabetes-related online social networks.

    Science.gov (United States)

    Weitzman, Elissa R; Cole, Emily; Kaci, Liljana; Mandl, Kenneth D

    2011-05-01

    To foster informed decision-making about health social networking (SN) by patients and clinicians, the authors evaluated the quality/safety of SN sites' policies and practices. Multisite structured observation of diabetes-focused SN sites. Measurements 28 indicators of quality and safety covering: (1) alignment of content with diabetes science and clinical practice recommendations; (2) safety practices for auditing content, supporting transparency and moderation; (3) accessibility of privacy policies and the communication and control of privacy risks; and (4) centralized sharing of member data and member control over sharing. Quality was variable across n=10 sites: 50% were aligned with diabetes science/clinical practice recommendations with gaps in medical disclaimer use (30% have) and specification of relevant glycosylated hemoglobin levels (0% have). Safety was mixed with gaps in external review approaches (20% used audits and association links) and internal review approaches (70% use moderation). Internal safety review offers limited protection: misinformation about a diabetes 'cure' was found on four moderated sites. Of nine sites with advertising, transparency was missing on five; ads for unfounded 'cures' were present on three. Technological safety was poor with almost no use of procedures for secure data storage and transmission; only three sites support member controls over personal information. Privacy policies' poor readability impedes risk communication. Only three sites (30%) demonstrated better practice. Limitations English-language diabetes sites only. The quality/safety of diabetes SN is variable. Observed better practice suggests improvement is feasible. Mechanisms for improvement are recommended that engage key stakeholders to balance autonomy, community ownership, conditions for innovation, and consumer protection.

  20. The Armstrong Institute: An Academic Institute for Patient Safety and Quality Improvement, Research, Training, and Practice.

    Science.gov (United States)

    Pronovost, Peter J; Holzmueller, Christine G; Molello, Nancy E; Paine, Lori; Winner, Laura; Marsteller, Jill A; Berenholtz, Sean M; Aboumatar, Hanan J; Demski, Renee; Armstrong, C Michael

    2015-10-01

    Academic medical centers (AMCs) could advance the science of health care delivery, improve patient safety and quality improvement, and enhance value, but many centers have fragmented efforts with little accountability. Johns Hopkins Medicine, the AMC under which the Johns Hopkins University School of Medicine and the Johns Hopkins Health System are organized, experienced similar challenges, with operational patient safety and quality leadership separate from safety and quality-related research efforts. To unite efforts and establish accountability, the Armstrong Institute for Patient Safety and Quality was created in 2011.The authors describe the development, purpose, governance, function, and challenges of the institute to help other AMCs replicate it and accelerate safety and quality improvement. The purpose is to partner with patients, their loved ones, and all interested parties to end preventable harm, continuously improve patient outcomes and experience, and eliminate waste in health care. A governance structure was created, with care mapped into seven categories, to oversee the quality and safety of all patients treated at a Johns Hopkins Medicine entity. The governance has a Patient Safety and Quality Board Committee that sets strategic goals, and the institute communicates these goals throughout the health system and supports personnel in meeting these goals. The institute is organized into 13 functional councils reflecting their behaviors and purpose. The institute works daily to build the capacity of clinicians trained in safety and quality through established programs, advance improvement science, and implement and evaluate interventions to improve the quality of care and safety of patients.

  1. Effect of Storage on the Quality and Safety of Grains in Tharaka ...

    African Journals Online (AJOL)

    The contribution of grains to food security is limited by deterioration during storage and as such it was necessary to document the effect of storage on their quality and safety. The objective of this study was to determine the effect of storage on the quality and safety of grains in Maragua and Gikingo locations, Tharaka District, ...

  2. Los Alamos National Laboratory transuranic waste quality assurance project plan. Revision 1

    International Nuclear Information System (INIS)

    1997-01-01

    This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste

  3. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    Science.gov (United States)

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  4. Establishing the quality assurance programme for a nuclear power plant project

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide provides requirements, recommendations and illustrative examples for establishing the overall quality assurance programme, and its constituent programmes, for a nuclear power plant project. It also provides guidance on the planning and documenting of programme plans and actions that are intended to ensure the achievement of the appropriate quality throughout the design, procurement, manufacture, construction, commissioning, operation and decommissioning of the nuclear power plant. The provisions of this Safety Guide are applicable to all organizations performing activities affecting the quality of items important to safety, such as designing, purchasing, fabricating, manufacturing, handling, shipping, storing, cleaning, erecting, installing, testing, commissioning, operating, inspecting, maintaining, repairing, refuelling, modifying and decommissioning

  5. Achieving performance breakthroughs in an HMO business process through quality planning.

    Science.gov (United States)

    Hanan, K B

    1993-01-01

    Kaiser Permanente's Georgia Region commissioned a quality planning team to design a new process to improve payments to its suppliers and vendors. The result of the team's effort was a 73 percent reduction in cycle time. This team's experiences point to the advantages of process redesign as a quality planning model, as well as some general guidelines for its most effective use in teams. If quality planning project teams are carefully configured, sufficiently expert in the existing process, and properly supported by management, organizations can achieve potentially dramatic improvements in process performance using this approach.

  6. Quality Control Activities Related to Mechanical Maintenance of Safety Related Components at Krsko NPP

    International Nuclear Information System (INIS)

    Djakovic, D.

    2016-01-01

    For successful, safe and reliable operation of nuclear power plant, maintenance processes have to be systematically controlled and procedures for quality control of maintenance activities shall be established. This is requested by the quality assurance program, which shall provide control over activities affecting the quality of structures, systems, and components, considering their importance to safety. As a part of Quality and Nuclear Oversight Division (QNOD; SKV), the Quality Control Department (QC) provides quality control activities, which are deeply involved in maintenance processes at Krsko NPP, both on safety related and non-safety related (non-nuclear safety) components. QC activities on safety related components have to fulfil all requirements, which will enable the components to perform their intended safety functions. This paper describes quality control activities related to mechanical maintenance of safety related components at Krsko NPP and significant role of the Krsko plant QC Department in three particular maintenance cases connected with safety related components. In these three specific cases, the QC has confirmed its importance in compliance with quality assurance program and presented its significant added value in providing safe and reliable operation of the plant. The first maintenance activity was installation of nozzle check valves in the scope of a modification for improving regulation of spent fuel pit pumps. The QC Department performed receipt inspection of the valves. Using non-destructive examination methods and X-ray spectrometry, it was found out that the valve diffuser was made of improper material, which could cause progressive corrosion of the valve diffuser in borated water and consequently a loss of safety function of the valves followed by long-term consequences. The second one was the receipt inspection of containment ventilation fan coolers. The coolers were claimed and sent back to the supplier because the QC Department

  7. Ten years after the IOM report: Engaging residents in quality and patient safety by creating a House Staff Quality Council.

    Science.gov (United States)

    Fleischut, Peter M; Evans, Adam S; Nugent, William C; Faggiani, Susan L; Lazar, Eliot J; Liebowitz, Richard S; Forese, Laura L; Kerr, Gregory E

    2011-01-01

    Ten years after the 1999 Institute of Medicine report, it is clear that despite significant progress, much remains to be done to improve quality and patient safety (QPS). Recognizing the critical role of postgraduate trainees, an innovative approach was developed at New York-Presbyterian Hospital, Weill Cornell Medical Center to engage residents in QPS by creating a Housestaff Quality Council (HQC). HQC leaders and representatives from each clinical department communicate and partner regularly with hospital administration and other key departments to address interdisciplinary quality improvement (QI). In support of the mission to improve patient care and safety, QI initiatives included attaining greater than 90% compliance with medication reconciliation and reduction in the use of paper laboratory orders by more than 70%. A patient safety awareness campaign is expected to evolve into a transparent environment where house staff can openly discuss patient safety issues to improve the quality of care.

  8. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.; Manis, L.W.; Barre, W.L.

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S ampersand H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures

  9. Planning and implementation of reliability/quality programs to energy plants

    International Nuclear Information System (INIS)

    Quenon, J.

    1986-01-01

    Quality Assurance principles have long been applied in part to many varied industrial enterprises. The advent of commercial nuclear power brought the evolution of a more comprehensive approach to the applications of quality assurance programs in this industry. However, the application philosophy was almost totally aimed at assuring the safety of the worker and the public. Recently, there has been a strong movement by industries and business in the U.S. and Europe to apply quality assurance in a more general way to assure overall reliability as well as safety. This paper describes an approach to enable management to not only make initial determinations of how to apply the elements of a reliability/quality assurance program, but how to continuously adjust the program to optimize the benefits that can be obtained

  10. Quality of family planning services in Northwest Ethiopia | Fantahun ...

    African Journals Online (AJOL)

    Background: The unmet need for family planning services in Ethiopia is believed to be high (36%) while the already available services do not appear to be optimally used by potential clients. It is thus expected that an assessment and improvement of the quality of family planning services could enhance family planning ...

  11. Study on Food Quality and Safety Management Based on Hotel Management

    OpenAIRE

    Shi Zengye

    2017-01-01

    In recent years, with the frequent occurrence of food safety problems, people have begun to pay attention to food safety, especially the food safety of hotels. This paper proposed a Hazard Analysis and Critical Control Point (HACCP) management system to analyze food safety issues of hotels in order to improve the food quality and safety in hotel management. Through the practical application of the HACCP management system in the hotel catering industry, it was found that the amount of bacteria...

  12. Tank safety screening data quality objective. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, J.W.

    1995-04-27

    The Tank Safety Screening Data Quality Objective (DQO) will be used to classify 149 single shell tanks and 28 double shell tanks containing high-level radioactive waste into safety categories for safety issues dealing with the presence of ferrocyanide, organics, flammable gases, and criticality. Decision rules used to classify a tank as ``safe`` or ``not safe`` are presented. Primary and secondary decision variables used for safety status classification are discussed. The number and type of samples required are presented. A tabular identification of each analyte to be measured to support the safety classification, the analytical method to be used, the type of sample, the decision threshold for each analyte that would, if violated, place the tank on the safety issue watch list, and the assumed (desired) analytical uncertainty are provided. This is a living document that should be evaluated for updates on a semiannual basis. Evaluation areas consist of: identification of tanks that have been added or deleted from the specific safety issue watch lists, changes in primary and secondary decision variables, changes in decision rules used for the safety status classification, and changes in analytical requirements. This document directly supports all safety issue specific DQOs and additional characterization DQO efforts associated with pretreatment and retrieval. Additionally, information obtained during implementation can assist in resolving assumptions for revised safety strategies, and in addition, obtaining information which will support the determination of error tolerances, confidence levels, and optimization schemes for later revised safety strategy documentation.

  13. Anesthesia Quality and Patient Safety in China: A Survey.

    Science.gov (United States)

    Zhu, Bin; Gao, Huan; Zhou, Xiangyong; Huang, Jeffrey

    There has been no nationwide investigation into anesthesia quality and patient safety in China. The authors surveyed Chinese anesthesiologists about anesthesia quality by sending a survey to all anesthesiologist members of the New Youth Anesthesia Forum via WeChat. The respondents could choose to use a mobile device or desktop to complete the survey. The overall response rate was 43%. Intraoperative monitoring: 77.9% of respondents reported that electrocardiogram monitoring was routinely applied for all patients; only 55% of the respondents reported that they routinely used end-tidal carbon dioxide monitoring for their patients under general anesthesia. 10.3% of respondents admitted that they had at least one wrong medicine administration in the past 3 months; 12.4% reported that they had at least one case of cardiac arrest in the past year. This is the first anesthesia quality survey in China. The findings revealed potential anesthesia safety issues in China.

  14. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  15. SU-G-TeP1-07: Investigation of RapidPlan Based Plan Quality for Breast IMRTSimultaneously Integrated Boost

    International Nuclear Information System (INIS)

    Wang, J; Hu, W; Chen, X; Wu, Z

    2016-01-01

    Purpose: The aim of this study is to investigate the feasibility of using RapidPlan for breast cancer radiotherapy and to evaluate its performance for planners with different planning experiences. Methods: A training database was collected with 80 expert plan datasets from patients previously received left breast conserving surgery and IMRT-simultaneously integrated boost radiotherapy. The models were created on the RapidPlan. Five patients from the training database and 5 external patients were used for internal and external validation, respectively. Three planners with different planning experiences (beginner, junior, senior) designed manual and RapidPlan based plans for additional ten patients. The plan qualities were compared with manual and RapidPlan based ones. Results: For the internal and external validations, there were no significant dose differences on target coverage for plans from RapidPlan and manual. Also, no difference was found in the mean doses to contralateral breast and lung. The RapidPlan improved the heart (V5, V10, V20, V30, and mead dose) and ipsilateral lung (V5, V10, V20, V30, and mean dose) sparing for the beginner and junior planners. Compare to the plans from senior planner, 6 out of 16 clinically checked parameters were improved in RapidPlan, and the left parameters were similar. Conclusion: It is feasible to generate clinical acceptable plans using RapidPlan for breast cancer radiotherapy. The RapidPlan helps to systematically improve the quality of IMRT plans against the benchmark of clinically accepted plans. The RapidPlan shows promise for homogenizing plan quality by transferring planning expertise from more experienced to less experienced planners.

  16. SU-G-TeP1-07: Investigation of RapidPlan Based Plan Quality for Breast IMRTSimultaneously Integrated Boost

    Energy Technology Data Exchange (ETDEWEB)

    Wang, J; Hu, W; Chen, X; Wu, Z [Fudan University Shanghai Cancer Center, Shanghai, Shanghai (China)

    2016-06-15

    Purpose: The aim of this study is to investigate the feasibility of using RapidPlan for breast cancer radiotherapy and to evaluate its performance for planners with different planning experiences. Methods: A training database was collected with 80 expert plan datasets from patients previously received left breast conserving surgery and IMRT-simultaneously integrated boost radiotherapy. The models were created on the RapidPlan. Five patients from the training database and 5 external patients were used for internal and external validation, respectively. Three planners with different planning experiences (beginner, junior, senior) designed manual and RapidPlan based plans for additional ten patients. The plan qualities were compared with manual and RapidPlan based ones. Results: For the internal and external validations, there were no significant dose differences on target coverage for plans from RapidPlan and manual. Also, no difference was found in the mean doses to contralateral breast and lung. The RapidPlan improved the heart (V5, V10, V20, V30, and mead dose) and ipsilateral lung (V5, V10, V20, V30, and mean dose) sparing for the beginner and junior planners. Compare to the plans from senior planner, 6 out of 16 clinically checked parameters were improved in RapidPlan, and the left parameters were similar. Conclusion: It is feasible to generate clinical acceptable plans using RapidPlan for breast cancer radiotherapy. The RapidPlan helps to systematically improve the quality of IMRT plans against the benchmark of clinically accepted plans. The RapidPlan shows promise for homogenizing plan quality by transferring planning expertise from more experienced to less experienced planners.

  17. WE-AB-209-07: Explicit and Convex Optimization of Plan Quality Metrics in Intensity-Modulated Radiation Therapy Treatment Planning

    International Nuclear Information System (INIS)

    Engberg, L; Eriksson, K; Hardemark, B; Forsgren, A

    2016-01-01

    Purpose: To formulate objective functions of a multicriteria fluence map optimization model that correlate well with plan quality metrics, and to solve this multicriteria model by convex approximation. Methods: In this study, objectives of a multicriteria model are formulated to explicitly either minimize or maximize a dose-at-volume measure. Given the widespread agreement that dose-at-volume levels play important roles in plan quality assessment, these objectives correlate well with plan quality metrics. This is in contrast to the conventional objectives, which are to maximize clinical goal achievement by relating to deviations from given dose-at-volume thresholds: while balancing the new objectives means explicitly balancing dose-at-volume levels, balancing the conventional objectives effectively means balancing deviations. Constituted by the inherently non-convex dose-at-volume measure, the new objectives are approximated by the convex mean-tail-dose measure (CVaR measure), yielding a convex approximation of the multicriteria model. Results: Advantages of using the convex approximation are investigated through juxtaposition with the conventional objectives in a computational study of two patient cases. Clinical goals of each case respectively point out three ROI dose-at-volume measures to be considered for plan quality assessment. This is translated in the convex approximation into minimizing three mean-tail-dose measures. Evaluations of the three ROI dose-at-volume measures on Pareto optimal plans are used to represent plan quality of the Pareto sets. Besides providing increased accuracy in terms of feasibility of solutions, the convex approximation generates Pareto sets with overall improved plan quality. In one case, the Pareto set generated by the convex approximation entirely dominates that generated with the conventional objectives. Conclusion: The initial computational study indicates that the convex approximation outperforms the conventional objectives

  18. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task

    International Nuclear Information System (INIS)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI ampersand SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI ampersand SI field task must include (1) the general health and safety program plan for all WAG 2 RI ampersand SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169

  19. Use of quality planning methods in optimizing welding wire quality characteristics

    Directory of Open Access Journals (Sweden)

    D. Vykydal

    2013-10-01

    Full Text Available The quality of a product is given by the extent, to which the product meets customer requirements. It is generally accepted that the extent, to which the product meets such customer requirements, and, consequently, the resulting quality of the product itself, substantially depend on the early stages of the product lifecycle, i.e. on the design and development stages. Appropriate means for effective product quality planning can be found among quality management methods and tools. These methods are typically employed in engineering production and automotive industry. This paper focuses on exploring the potential of Quality Function Deployment (QFD and Failure Mode and Effect Analysis (FMEA methods for use in metallurgical production, an industrial branch where they have not been commonly employed as yet.

  20. Water-safety strategies and local-scale spatial quality

    NARCIS (Netherlands)

    Nillesen, A.L.

    2013-01-01

    Delta regions throughout the world are subject to increasing flood risks. For protection, regional water safety strategies are being developed. Local-scale spatial qualities should be included in their evaluation. An experimental methodology has been developed for this purpose. This paper

  1. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  2. [Drinking water quality and safety].

    Science.gov (United States)

    Gómez-Gutiérrez, Anna; Miralles, Maria Josepa; Corbella, Irene; García, Soledad; Navarro, Sonia; Llebaria, Xavier

    2016-11-01

    The purpose of drinking water legislation is to guarantee the quality and safety of water intended for human consumption. In the European Union, Directive 98/83/EC updated the essential and binding quality criteria and standards, incorporated into Spanish national legislation by Royal Decree 140/2003. This article reviews the main characteristics of the aforementioned drinking water legislation and its impact on the improvement of water quality against empirical data from Catalonia. Analytical data reported in the Spanish national information system (SINAC) indicate that water quality in Catalonia has improved in recent years (from 88% of analytical reports in 2004 finding drinking water to be suitable for human consumption, compared to 95% in 2014). The improvement is fundamentally attributed to parameters concerning the organoleptic characteristics of water and parameters related to the monitoring of the drinking water treatment process. Two management experiences concerning compliance with quality standards for trihalomethanes and lead in Barcelona's water supply are also discussed. Finally, this paper presents some challenges that, in the opinion of the authors, still need to be incorporated into drinking water legislation. It is necessary to update Annex I of Directive 98/83/EC to integrate current scientific knowledge, as well as to improve consumer access to water quality data. Furthermore, a need to define common criteria for some non-resolved topics, such as products and materials in contact with drinking water and domestic conditioning equipment, has also been identified. Copyright © 2016 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  3. Environment and safety research status report: 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The 1993 status report discusses ongoing and planned research activities in the GRI Environment and Safety Program. The objectives and goals, accomplishments, and strategy along with the basis for each project area are presented for the supply, end use, and gas operations subprograms. Within the context of these subprograms, contract status summaries under their conceptual titles are given for the following project areas: Gas Supply Environmental and Safety Research, Air Quality Research, End Use Equipment Safety Research, Gas Operations Safety Research, Liquefied Natural Gas, Safety Research, and Gas Operations Environmental Research

  4. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  5. 242-A evaporator quality assurance project plan: Revision 1

    International Nuclear Information System (INIS)

    Tucker, B.J.

    1994-01-01

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal

  6. Focus State Roadway Departure Safety Plans and High Friction Surface Treatments Peer Exchange : an RPSCB Peer Exchange

    Science.gov (United States)

    2014-08-01

    This report summarizes the Focus State Roadway Departure Safety Plans and High Friction Surface Treatments Peer Exchange, held in Birmingham, Alabama, sponsored by the Federal Highway Administration (FHWA) Office of Safetys Roadway Safety Professi...

  7. Software quality assurance plan for viscometer

    International Nuclear Information System (INIS)

    Gimera, M.

    1994-01-01

    The in situ viscometer is a portable instrument designed to raise and lower a sphere (rheometer ball) through layers of tank waste material while recording ball position, velocity, and cable tension. In the field, the viscometer attaches to a decontamination spool piece which in turn is designed to attach to any 4-inch, 150-pound flange (typical of many available tank risers). The motion of the ball and collection of data is controlled by instrumentation and control equipment housed in a separate remote control console. This document covers the product, Viscometer Data Acquisition Software. This document provides the software quality assurance plan, verification and validation plan, and configuration management plan for developing the software for the instrumentation that will be used to obtain rheology data from Tank SY-101

  8. Food safety and quality assurance : foods of animal origin

    National Research Council Canada - National Science Library

    Hughes, Keith L; Hinton, Michael H; Hubbert, William T; Hagstad, Harry V; Spangler, Elizabeth

    1996-01-01

    The second edition of Food Safety and Quality Assurance is a basic reference for veterinarians, extension specialists, and others who help food-animal producers throughout the food chain to provide...

  9. Evaluation of service quality in family planning clinics in Lusaka, Zambia.

    Science.gov (United States)

    Hancock, Nancy L; Vwalika, Bellington; Sitali, Elizabeth Siyama; Mbwili-Muleya, Clara; Chi, Benjamin H; Stuart, Gretchen S

    2015-10-01

    To determine the quality of contraceptive services in family planning clinics in Lusaka, Zambia, using a standardized approach. We utilized the Quick Investigation of Quality, a cross-sectional survey tool consisting of a facility assessment, client-provider observation and client exit interview, in public-sector family planning clinics. Data were collected on availability of seven contraceptive methods, information given to clients, interpersonal relations between providers and clients, providers' technical competence and mechanisms for continuity and follow-up. Data were collected from five client-provider observations and client exit interviews in each of six public-sector family planning clinics. All clinics had at least two contraceptive methods continuously available for the preceding 6 months. Most providers asked clients about concerns with their contraceptive method (80%) and told clients when to return to the clinic (87%). Most clients reported that the provider advised what to do if a problem develops (93%), described possible side effects (89%), explained how to use the method effectively (85%) and told them when to come for follow-up (83%). Clients were satisfied with services received (93%). This application of the Quick Investigation of Quality showed that the participating family planning clinics in Lusaka, Zambia, were prepared to offer high-quality services with the available commodities and that clients were satisfied with the received services. Despite the subjective client satisfaction, quality improvement efforts are needed to increase contraceptive availability. Although clients perceived the quality of care received to be high, family planning service quality could be improved to continuously offer the full spectrum of contraceptive options. The Quick Investigation of Quality was easily implemented in Lusaka, Zambia, and this simple approach could be utilized in a variety of settings as a modality for quality improvement. Copyright © 2015

  10. The association between event learning and continuous quality improvement programs and culture of patient safety.

    Science.gov (United States)

    Mazur, Lukasz; Chera, Bhishamjit; Mosaly, Prithima; Taylor, Kinley; Tracton, Gregg; Johnson, Kendra; Comitz, Elizabeth; Adams, Robert; Pooya, Pegah; Ivy, Julie; Rockwell, John; Marks, Lawrence B

    2015-01-01

    To present our approach and results from our quality and safety program and to report their possible impact on our culture of patient safety. We created an event learning system (termed a "good catch" program) and encouraged staff to report any quality or safety concerns in real time. Events were analyzed to assess the utility of safety barriers. A formal continuous quality improvement program was created to address these reported events and make improvements. Data on perceptions of the culture of patient safety were collected using the Agency for Health Care Research and Quality survey administered before, during, and after the initiatives. Of 560 good catches reported, 367 could be ascribed to a specific step on our process map. The calculated utility of safety barriers was highest for those embedded into the pretreatment quality assurance checks performed by physicists and dosimetrists (utility score 0.53; 93 of 174) and routine checks done by therapists on the initial day of therapy. Therapists and physicists reported the highest number of good catches (24% each). Sixty-four percent of events were caused by performance issues (eg, not following standardized processes, including suboptimal communications). Of 31 initiated formal improvement events, 26 were successfully implemented and sustained, 4 were discontinued, and 1 was not implemented. Most of the continuous quality improvement program was conducted by nurses (14) and therapists (7). Percentages of positive responses in the patient safety culture survey appear to have increased on all dimensions (p continuous quality improvement programs can be successfully implemented and that there are contemporaneous improvements in the culture of safety. Copyright © 2015 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.

  11. Research on Cooperation Strategy of Enterprises’ Quality and Safety in Food Supply Chain

    Directory of Open Access Journals (Sweden)

    Jining Wang

    2015-01-01

    Full Text Available In order to prevent and control risk factors which harm the quality and safety of the food supply chain effectively and reduce the probability of food safety incidents, this paper investigated on some problems of the upstream and downstream enterprises of the food supply chain under the three different forms of cooperation based on the neoclassic economics and game theory method. These problems include the effectiveness of the quality and safety efforts, the profits, the effect of the losses that the food safety incidents caused on the quality efforts’ efficacy, and the social welfare comparison. Meanwhile, we constructed evolutionary game model to analyze the macro and micro factors that influenced the cooperation strategy and demonstrated the effect of diversity of decision-making parameters on evolution results based on numerical simulation. By the theoretical and simulation analysis, we found that (1 the quality efforts’ efficacy, the profits, the sensitivity coefficient of the quality efforts efficiency to the losses, and the social welfare without thinking about the externality all met their maximum under the full cooperation situation; (2 strengthening supervision over the source of the food supply chain can reduce the probability of food safety incidents; (3 macro and micro environment will be the important basis for companies’ decision-making on cooperation strategy in the food supply chain.

  12. KCBX Quality Assurance Project Plan - February 2014

    Science.gov (United States)

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  13. Improved Management of Part Safety Classification System for Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jin Young; Park, Youn Won; Park, Heung Gyu; Park, Hyo Chan [BEES Inc., Daejeon (Korea, Republic of)

    2016-10-15

    As, in recent years, many quality assurance (QA) related incidents, such as falsely-certified parts and forged documentation, etc., were reported in association with the supply of structures, systems, components and parts to nuclear power plants, a need for a better management of safety classification system was addressed so that it would be based more on the level of parts . Presently, the Korean nuclear power plants do not develop and apply relevant procedures for safety classifications, but rather the safety classes of parts are determined solely based on the experience of equipment designers. So proposed in this paper is a better management plan for safety equipment classification system with an aim to strengthen the quality management for parts. The plan was developed through the analysis of newly introduced technical criteria to be applied to parts of nuclear power plant.

  14. Procedure for getting safety classed concrete structures approved by Finnish Radiation and Nuclear Safety Authority

    International Nuclear Information System (INIS)

    Halme, Ville-Juhani

    2015-01-01

    Posiva is preparing geological final disposal in the Finnish bedrock in Olkiluoto, Eurajoki. The final disposal facility includes encapsulation plant and underground repository. Most of the main civil structures are concrete structures. STUK is the supervising authority in civil structures. The National Building Code of Finland and STUK's Regulatory Guide on nuclear safety (YVL) are the most important instructions when constructing concrete structures into nuclear installation. Posiva has classified concrete structures in two classes according STUK's YVL-guidance: EYT (non-nuclear) and Safety Class 3 (SC 3, nuclear safety significance). When building SC 3 concrete structures, specific protocol must be followed. Protocol includes planned routines for design, construction, supervision, quality control (QC) and quality assurance (QA) activities. Documents relating concrete structures must be approved by Posiva and STUK before construction work. After structures have been designed and actual building is ongoing, there are two main steps. Before concreting, readiness inspection for concreting must be arranged. Readiness inspection will be arranged according to a specific plan and the date must be informed to STUK. After establishing readiness for concreting, casting work can begin. Once concrete structures are done, inspected and approved, final documentation according to a quality control plan will be reviewed by Posiva. After Posiva's approval, final documentation will be sent for STUK's approval. In the end STUK will give the permission for commissioning of the concrete structures after approved commissioning inspection. The document is made up of an abstract and a poster

  15. Quality assessment for VMAT prostate radiotherapy planning based on data envelopment analysis

    International Nuclear Information System (INIS)

    Lin, Kuan-Min; Simpson, John; Raith, Andrea; Ehrgott, Matthias; Sasso, Giuseppe

    2013-01-01

    The majority of commercial radiotherapy treatment planning systems requires planners to iteratively adjust the plan parameters in order to find a satisfactory plan. This iterative trial-and-error nature of radiotherapy treatment planning results in an inefficient planning process and in order to reduce such inefficiency, plans can be accepted without achieving the best attainable quality. We propose a quality assessment method based on data envelopment analysis (DEA) to address this inefficiency. This method compares a plan of interest to a set of past delivered plans and searches for evidence of potential further improvement. With the assistance of DEA, planners will be able to make informed decisions on whether further planning is required and ensure that a plan is only accepted when the plan quality is close to the best attainable one. We apply the DEA method to 37 prostate plans using two assessment parameters: rectal generalized equivalent uniform dose (gEUD) as the input and D95 (the minimum dose that is received by 95% volume of a structure) of the planning target volume (PTV) as the output. The percentage volume of rectum overlapping PTV is used to account for anatomical variations between patients and is included in the model as a non-discretionary output variable. Five plans that are considered of lesser quality by DEA are re-optimized with the goal to further improve rectal sparing. After re-optimization, all five plans improve in rectal gEUD without clinically considerable deterioration of the PTV D95 value. For the five re-optimized plans, the rectal gEUD is reduced by an average of 1.84 Gray (Gy) with only an average reduction of 0.07 Gy in PTV D95. The results demonstrate that DEA can correctly identify plans with potential improvements in terms of the chosen input and outputs. (paper)

  16. TH-E-19A-01: Quality and Safety in Radiation Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Ford, E [University of Washington, Seattle, WA (United States); Ezzell, G [Mayo Clinic Arizona, Phoenix, AZ (United States); Miller, B [Henry Ford Health System, Clinton Township, MI (United States); Yorke, E [Memorial Sloan-Kettering Cancer Center, New York, NY (United States)

    2014-06-15

    Clinical radiotherapy data clearly demonstrate the link between the quality and safety of radiation treatments and the outcome for patients. The medical physicist plays an essential role in this process. To ensure the highest quality treatments, the medical physicist must understand and employ modern quality improvement techniques. This extends well beyond the duties traditionally associated with prescriptive QA measures. This session will review the current best practices for improving quality and safety in radiation therapy. General elements of quality management will be reviewed including: what makes a good quality management structure, the use of prospective risk analysis such as FMEA, and the use of incident learning. All of these practices are recommended in society-level documents and are incorporated into the new Practice Accreditation program developed by ASTRO. To be effective, however, these techniques must be practical in a resource-limited environment. This session will therefore focus on practical tools such as the newly-released radiation oncology incident learning system, RO-ILS, supported by AAPM and ASTRO. With these general constructs in mind, a case study will be presented of quality management in an SBRT service. An example FMEA risk assessment will be presented along with incident learning examples including root cause analysis. As the physicist's role as “quality officer” continues to evolve it will be essential to understand and employ the most effective techniques for quality improvement. This session will provide a concrete overview of the fundamentals in quality and safety. Learning Objectives: Recognize the essential elements of a good quality management system in radiotherapy. Understand the value of incident learning and the AAPM/ASTRO ROILS incident learning system. Appreciate failure mode and effects analysis as a risk assessment tool and its use in resource-limited environments. Understand the fundamental principles of good

  17. TH-E-19A-01: Quality and Safety in Radiation Therapy

    International Nuclear Information System (INIS)

    Ford, E; Ezzell, G; Miller, B; Yorke, E

    2014-01-01

    Clinical radiotherapy data clearly demonstrate the link between the quality and safety of radiation treatments and the outcome for patients. The medical physicist plays an essential role in this process. To ensure the highest quality treatments, the medical physicist must understand and employ modern quality improvement techniques. This extends well beyond the duties traditionally associated with prescriptive QA measures. This session will review the current best practices for improving quality and safety in radiation therapy. General elements of quality management will be reviewed including: what makes a good quality management structure, the use of prospective risk analysis such as FMEA, and the use of incident learning. All of these practices are recommended in society-level documents and are incorporated into the new Practice Accreditation program developed by ASTRO. To be effective, however, these techniques must be practical in a resource-limited environment. This session will therefore focus on practical tools such as the newly-released radiation oncology incident learning system, RO-ILS, supported by AAPM and ASTRO. With these general constructs in mind, a case study will be presented of quality management in an SBRT service. An example FMEA risk assessment will be presented along with incident learning examples including root cause analysis. As the physicist's role as “quality officer” continues to evolve it will be essential to understand and employ the most effective techniques for quality improvement. This session will provide a concrete overview of the fundamentals in quality and safety. Learning Objectives: Recognize the essential elements of a good quality management system in radiotherapy. Understand the value of incident learning and the AAPM/ASTRO ROILS incident learning system. Appreciate failure mode and effects analysis as a risk assessment tool and its use in resource-limited environments. Understand the fundamental principles of good

  18. Research priorities for coordinating management of food safety and water quality.

    Science.gov (United States)

    Crohn, David M; Bianchi, Mary L

    2008-01-01

    Efforts to exclude disease organisms from farms growing irrigated lettuce and leafy vegetables on California's central coast are conflicting with traditionally accepted strategies to protect surface water quality. To begin resolving this dilemma, over 100 officials, researchers, and industry representatives gathered in April 2007 to set research priorities that could lead to effective co-management of both food safety and water quality. Following the meeting, research priorities were refined and ordered by way of a Delphi process completed by 35 meeting participants. Although water quality and food safety experts conceptualized the issues differently, there were no deep disagreements with respect to research needs. Top priority was given to investigating the fate of pathogens potentially present on farms. Intermediate priorities included characterizing the influence of specific farm management practices on food safety and improving our understanding of vector processes. A scientific subdiscipline focusing on competing risks is needed to characterize and resolve conflicts between human and environmental health.

  19. Quality management in SNSA

    International Nuclear Information System (INIS)

    Levstek, M.F.; Slokan Dusic, D.

    2002-01-01

    The Slovenian Nuclear Safety Administration (SNSA) within the Ministry of Environment, Spatial Planning and Energy acts as the national regulatory authority for nuclear safety and radiation protection of workers in nuclear installations and of population in the vicinity of nuclear facilities. The SNSA has decided to document its own quality management system due to two basic reasons. Firstly, as a regulatory body for nuclear and radiological safety the SNSA should have an adequate quality management system. Secondly, the Slovenian Government stimulates the initiation of a quality system in all public authorities and that is evident from its strategic directives and aims. In order to develop the quality management system the Quality Board and the Project Team have been established. The quality management system is being developed in accordance with International Standard ISO 9001: 2000, IAEA Safety Series No. 50-C/SG-Q; January 2001 and the IAEATECDOC- 1090: Quality Assurance within Regulatory Bodies; June 1999 considering all other adequate documents referring to nuclear quality. The quality manual together with subordinate level documents are the means to conveying the elements and operation of the quality system to all staff involved, ensuring that the system is effectively implemented and achieves its goals.(author)

  20. KCBX Quality Assurance Project Plan - October 2014

    Science.gov (United States)

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  1. 75 FR 65572 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards... apply to Ohio's SIP. Incorporating the air quality standards into Ohio's SIP helps assure that...

  2. Groundwater well services site safety and health plan

    International Nuclear Information System (INIS)

    Tuttle, B.G.

    1996-08-01

    This Site Specific Health and Safety Plan covers well servicing in support of the Environmental Restoration Contractor Groundwater Project. Well servicing is an important part of environmental restoration activities supporting several pump and treat facilities and assisting in evaluation and servicing of various groundwater wells throughout the Hanford Site. Remediation of contaminated groundwater is a major part of the ERC project. Well services tasks help enhance groundwater extraction/injection as well as maintain groundwater wells for sampling and other hydrologic testing and information gathering

  3. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    International Nuclear Information System (INIS)

    Olch, A

    2015-01-01

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Eleven neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has

  4. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    Energy Technology Data Exchange (ETDEWEB)

    Olch, A [University of Southern California, Los Angeles, CA (United States)

    2015-06-15

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Eleven neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has

  5. Family planning services quality as a determinant of use of IUD in Egypt

    Directory of Open Access Journals (Sweden)

    Montana Livia

    2006-06-01

    Full Text Available Abstract Background Both availability and quality of family planning services are believed to have contributed to increasing contraceptive use and declining fertility rates in developing countries. Yet, there is limited empirical evidence to show the relationship between the quality of family planning services and the population based prevalence of contraceptive methods. This study examined the relationship between quality of family planning services and use of intrauterine devices (IUD in Egypt. Methods The analysis used data from the 2003 Egypt Interim Demographic and Health Survey (EIDHS that included 8,445 married women aged 15–49, and the 2002 Egypt Service Provision Assessment (ESPA survey that included 602 facilities offering family planning services. The EIDHS collected latitude and longitude coordinates of all sampled clusters, and the ESPA collected these coordinates for all sampled facilities. Using Geographic Information System (GIS methods, individual women were linked to a facility located within 10 km of their community. A facility-level index was constructed to reflect the quality of family planning services. Four dimensions of quality of care were examined: counseling, examination room, supply of contraceptive methods, and management. Effects of quality of family planning services on the use of IUD and other contraceptive methods were estimated using multinomial logistic regression. Results are presented as relative risk ratios (RRR with significance levels (p-values. Results IUD use among women who obtained their method from public sources was significantly positively associated with quality of family planning services (RRR = 1.36, p Conclusion This study is one among the few that used geographic information to link data from a population-based survey with an independently sampled health facility survey. The findings demonstrate that service quality is an important determinant of use of clinical contraceptive methods in Egypt

  6. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan

  7. Development of a quality assurance safety assessment database for near surface radioactive waste disposal

    International Nuclear Information System (INIS)

    Park, J. W.; Kim, C. L.; Park, J. B.; Lee, E. Y.; Lee, Y. M.; Kang, C. H.; Zhou, W.; Kozak, M. W.

    2003-01-01

    A quality assurance safety assessment database, called QUARK (QUality Assurance program for Radioactive waste management in Korea), has been developed to manage both analysis information and parameter database for safety assessment of Low- and Intermediate-Level radioactive Waste (LILW) disposal facility in Korea. QUARK is such a tool that serves QA purposes for managing safety assessment information properly and securely. In QUARK, the information is organized and linked to maximize the integrity of information and traceability. QUARK provides guidance to conduct safety assessment analysis, from scenario generation to result analysis, and provides a window to inspect and trace previous safety assessment analysis and parameter values. QUARK also provides default database for safety assessment staff who construct input data files using SAGE(Safety Assessment Groundwater Evaluation), a safety assessment computer code

  8. Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Abston, J.P.; Burman, S.N.; Jones, D.L.

    1995-10-01

    The health and safety plan/work plan describes a strategy for characterizing the contents of 172 liquid waste and 33 solid waste drums. It also addresses the control measures that will be taken to (1) prevent or minimize any adverse impact on the environment or personnel safety and health and (2) meet standards that define acceptable management of hazardous and radioactive materials and wastes. When writing this document, the authors considered past experiences, recommendations, and best management practices to minimize possible hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or unplanned releases of hazardous or radioactive materials to air, soil, or surface water

  9. Connected vehicle pilot deployment program phase 1, safety management plan - Tampa (THEA).

    Science.gov (United States)

    2016-04-01

    This document presents the Safety Management Plan for the THEA Connected Vehicle (CV) Pilot Deployment. The THEA CV Pilot : Deployment goal is to advance and enable safe, interoperable, networked wireless communications among vehicles, the : infrastr...

  10. Organization of the operating quality in EDF nuclear power stations

    International Nuclear Information System (INIS)

    Stolz, J.

    1976-01-01

    The organization of operating quality in EDF nuclear stations cover a number of planned and systematic actions of technical and management order carried on at station level and Nuclear Safety Department level. Priority is given to safety quality which has to remain the same during the whole life of the stations; the safety of a station depending from its designing, realization and starting up quality on one hand and from its operating methods on the other [fr

  11. Quality assurance for safety in the radioactive waste management: a quality assurance system in Novi Han radioactive waste repository

    International Nuclear Information System (INIS)

    Petrova, A.; Kolev, I.

    2000-01-01

    Novi Han Radioactive Waste Repository (RWR) is still the only place in Bulgaria for storage of low and intermediate level radioactive waste. It is necessary to establish and maintain a Quality Assurance (QA) system to ensure that the RWR can be operated safely with regard to the health and safety of the general public and site personnel. A QA system has to establish the basic requirements for quality assurance in order to enhance nuclear safety by continuously improving the methods employed to achieve quality. It is envisaged that the QA system for the Novi Han RWR will cover the operation and maintenance of the radioactive waste disposal facilities, the radiation protection and monitoring of the site, as well as the scientific and technology development aspects. The functions of the Novi Han RWR presume the availability of an environmental management system. It is appropriate to establish a QA system based on the requirements of the ISO Standards 9001 and 14000, using the recommendations of the IAEA (Quality assurance for safety in NPPs and other nuclear installations, code and safety guides Q1-Q14). (authors)

  12. Restructuring within an academic health center to support quality and safety: the development of the Center for Quality and Safety at the Massachusetts General Hospital.

    Science.gov (United States)

    Bohmer, Richard M J; Bloom, Jonathan D; Mort, Elizabeth A; Demehin, Akinluwa A; Meyer, Gregg S

    2009-12-01

    Recent focus on the need to improve the quality and safety of health care has created new challenges for academic health centers (AHCs). Whereas previously quality was largely assumed, today it is increasingly quantifiable and requires organized systems for improvement. Traditional structures and cultures within AHCs, although well suited to the tripartite missions of teaching, research, and clinical care, are not easily adaptable to the tasks of measuring, reporting, and improving quality. Here, the authors use a case study of Massachusetts General Hospital's efforts to restructure quality and safety to illustrate the value of beginning with a focus on organizational culture, using a systematic process of engaging clinical leadership, developing an organizational framework dependent on proven business principles, leveraging focus events, and maintaining executive dedication to execution of the initiative. The case provides a generalizable example for AHCs of how applying explicit management design can foster robust organizational change with relatively modest incremental financial resources.

  13. Safety and quality management at the high flux reactor Petten

    International Nuclear Information System (INIS)

    Zurita, A.; Ahlf, J.

    1995-01-01

    The High Flux Reactor (HFR) is one high power multi-purpose materials testing research reactor of the tank-in-pool type, cooled and moderated by light-water. It is operated at 45 MW at a prescribed schedule of 11 cycles per year, each comprising 25 operation days and three shut-down days. Since the licence for the operation of HFR was granted in 1962, a total of 14 amendments to the original licence have been made following different modifications in the installations. In the meantime, international nuclear standards were developed, especially in the framework of the NUSS programme of the IAEA, which were adopted by the Dutch Licensing Authorities. In order to implement the new standards, the situation at the HFR was comprehensively reviewed in the course of an audit performed by the Dutch Licensing Authorities in 1988. This also resulted in formulating the task of setting-up an 'HFR - Integral Quality Assurance Handbook' (HFR-IQAD) involving both organizations JRCIAM and ECN, which had the unique framework and basic guideline to assure the safe and efficient operation and exploitation of the HFR and to promote safety and quality in all aspects of HFR related activities. The assurance of safe and efficient operation and exploitation of the HFR is condensed together under the concepts of safety and quality of services and is achieved through the safety and quality management. (orig.)

  14. Determinants of Client-Professional Relationship Quality in the Financial Planning Setting

    Directory of Open Access Journals (Sweden)

    Katherine Hunt

    2011-06-01

    Full Text Available Advice provided by financial planners has the potential to impact the financial and emotional well being ofclients. Despite the outcomes of quality financial planning relationships, there is little direct evidence tosupport the importance of ‘relationship quality’ in financial planning. Previous research has emphasised theimportance of relationship quality in psychology, nursing, and business settings. This research investigatesdeterminants of client-professional relationship quality in financial planning, measured in a survey of clientsand financial planners regarding relationship factors of trust, engagement, empowerment, ownership, clientactivity and commitment. Ratings for relationship dimensions were compared between clients and financialplanners, with financial planners found to overestimate their clients’ levels of trust and commitment andunderestimate their client’s levels of empowerment. The relationship dimension of ‘trust’ was found to becritical for client-professional relationship quality.

  15. Radiation safety and quality control assurance in X-ray diagnostics 1998

    International Nuclear Information System (INIS)

    Servomaa, A.

    1998-03-01

    The report is based on a seminar course of lectures 'Radiation safety and quality assurance in X-ray diagnostics 1998' organized by the Radiation and Nuclear Safety Authority (STUK) in Finland. The lectures included actual information on X-ray examinations: methods of quality assurance, methods of measuring and calculating patient doses, examination frequencies, patient doses, occupational doses, and radiation risks. Paediatric X-ray examinations and interventional procedures were the most specific topics. The new Council Directive 97/43/Euratom on medical exposure, and the European Guidelines on quality criteria for diagnostic radiographic images, were discussed in several lectures. Lectures on general radiation threats and preparedness, examples of radiation accidents, and emergency preparedness in hospitals were also included. (editor)

  16. Specification of safety requirements for waste packages with respect to practicable quality control measures

    International Nuclear Information System (INIS)

    Gruendler, D.; Wurtinger, W.

    1987-01-01

    Waste packages for disposal in a repository in the Federal Republic of Germany have to meet safety requirements derived from site specific safety analyses. The examination of the waste packages with regard to compliance with these requirements is the main objective of quality control measures. With respect to quality control the requirements have to be specified in a way that practicable control measures can be applied. This is dealt with for the quality control of the activity inventory and the quality control of the waste form. The paper discusses the determination of the activity of hard-to-measure radionuclides and the specification of safety related requirements for the waste form and the packaging using typical examples

  17. Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995

    Energy Technology Data Exchange (ETDEWEB)

    1989-06-01

    The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportation safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included.

  18. Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995

    International Nuclear Information System (INIS)

    1989-06-01

    The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportation safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included

  19. Analisis Kepatuhan Supervisor Terhadap Implementasi Program Occupational Health & Safety (Ohs) Planned Inspection Di PT. Ccai

    OpenAIRE

    Sarah, Dewi; Ekawati, Ekawati; Widjasena, Baju

    2015-01-01

    The Government has issued Regulation Legislation No. 50 Year 2012 on Health and Safety Management System (SMK3). CCAI is a company that has implemented SMK3. The application of the CCAI SMK3 supported by K3 program one of them is OHS Planned Inspection. This study aimed to analyze the implementation of Occupational Health & Safety (OHS) program Planned Inspection in CCAI. The subjects of this study amounted to five people as the main informants and 2 as an informant triangulation. The res...

  20. Patient safety in the care of mentally ill people in Switzerland: Action plan 2016

    Science.gov (United States)

    Richard, Aline; Mascherek, Anna C; Schwappach, David L B

    2017-01-01

    Background: Patient safety in mental healthcare has not attracted great attention yet, although the burden and the prevalence of mental diseases are high. The risk of errors with potential for harm of patients, such as aggression against self and others or non-drug treatment errors is particularly high in this vulnerable group. Aim: To develop priority topics and strategies for action to foster patient safety in mental healthcare. Method: The Swiss patient safety foundation together with experts conducted round table discussions and a Delphi questionnaire to define topics along the treatment pathway, and to prioritise these topics. Finally, fields of action were developed. Results: An action plan was developed including the definition and prioritization of 9 topics where errors may occur. A global rating task revealed errors concerning diagnostics and structural errors as most important. This led to the development of 4 fields of action (awareness raising, research, implementation, and education and training) including practice-oriented potential starting points to enhance patient safety. Conclusions: The action plan highlights issues of high concern for patient safety in mental healthcare. It serves as a starting point for the development of strategies for action as well as of concrete activities.