WorldWideScience

Sample records for safe operating procedures

  1. Guideline for the preparation of safe operating procedures

    International Nuclear Information System (INIS)

    Stinnett, L.; Carroll, M.M.; Crooks, D.L.; Doyle, J.R.; Jeblick, H.G.; Kessel, D.S.; Tippy, M.W.; Stuckey, J.M.

    1981-03-01

    These procedures are written for activities that involve the use of explosives, dangerous chemicals, radioactive materials, hazardous sytems, and for certain types of operational facilities which present hazards. This guideline presents a suggested Safe Operating Procedures format

  2. Guideline for the preparation of safe operating procedures

    International Nuclear Information System (INIS)

    Stinnett, L.; Armbrust, E.F.; Christy, V.W.; Doyle, J.R.; Kesinger, J.H.

    1977-03-01

    Sandia Laboratories Safe Operating Procedures (SOP) are written for activities which involve the use of explosives, dangerous chemicals, radioactive materials, hazardous systems, and certain types of operational facilities which present hazards. This guideline presents a suggested SOP format

  3. Manpower development for safe operation of nuclear power plant. China. Emergency operating procedures. Activity: 5.1.4-Task-11. Technical report

    International Nuclear Information System (INIS)

    Walsh, L.A.

    1994-01-01

    This report covers the period of engagement from July 11, 1994 through July 22, 1994. The events and topics of discussion are as follows: History of Emergency Operating Procedure EOP Development; Emergency Operating Procedures (Event Based, Critical Safe Function Status Trees and Functional Recovery Response Procedures); Transition from Emergency Operating Procedures to Severe Accident Management Guidelines

  4. Safe injection procedures, injection practices, and needlestick ...

    African Journals Online (AJOL)

    Nermine Mohamed Tawfik Foda

    2017-01-10

    Jan 10, 2017 ... Background: Of the estimated 384,000 needle-stick injuries occurring in hospitals each year, 23% occur in surgical settings. This study was conducted to assess safe injection procedures, injection practices, and circumstances contributing to needlestick and sharps injures (NSSIs) in operating rooms.

  5. 40 CFR 68.52 - Operating procedures.

    Science.gov (United States)

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.52 Operating procedures. (a) The... for safely conducting activities associated with each covered process consistent with the safety information for that process. Operating procedures or instructions provided by equipment manufacturers or...

  6. Procedure of safe handling with cytostatic drugs

    Directory of Open Access Journals (Sweden)

    Kodžo Dragan

    2003-01-01

    Full Text Available Working group for safe handling with cytostatic drugs has been formed by the Ministry of Health, and it consists of professionals from IORS, Federal Bureau of Weights and Measures, Industrial Medicine, Institute of Hematology, Military Medical Academy, and Crown Agents. The aim of this working group is to prepare procedures for safe handling with cytostatic drugs, as well as program for educational seminar for nurses, medical technicians, and pharmaceutical technicians. The procedures will serve as a guide of good practice of oncology health care, and will refer to all actions that health care professionals carry out from the moment of drugs arrival to the pharmacy to the moment of their application. In the first segment of this procedure, general rules are given for working with cytotoxic agents, control for risky exposures, safe system of work, control of working environment, monitoring of the employees' health condition adequate protection in the working environment, protective equipment of the employees (gloves, mask, cap, eyeglasses, shoe covers, coats and chambers for vertical laminary air stream. Storing of cytostatics, procedure in case of accident, and waste handling and removal are also described in this segment. Fifty-three standard operational procedures are described in detail in the second segment. Training scheme for preparation of chemotherapy is given in the third segment - education related to various fields and practical part, which would be carried out through workshops, and at the end of the course participants would pass a test and obtain certificate. After the procedures for safe handling with cytostatics are legally regulated employer will have to provide minimum of protective equipment, special rooms for the drugs dissolving, chambers with laminar airflow, 6 hours working time, rotation of the staff working with drugs dissolving in intervals of every five years, higher efficiency, better health control. In conclusion

  7. Management of nuclear power plants for safe operation

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture covers management aspects which have an immediate bearing on safety and identifies the objectives and tasks of management which are required for safe operation of a nuclear power plant and is based on the Codes of Practice and Safety Guides of the IAEA as well as arrangements in use at the Swiss Nuclear Power Station Beznau. This lecture - discusses the factors to be considered in structuring the operating organization, the support to be provided to plant management, the services and facilities needed and the management system for assuring the safety tasks are performed - describes the responsibilities of plant management and operating organization - outlines the requirements for recruitment, training and retraining as well as qualification and authorization of personnel - describes the programmes for maintenance, testing, examination, inspection, radiological protection, quality assurance, waste management, fuel management, emergency arrangement and security - describes the development of plant operating procedures including procedures to protect the personnel - outlines the requirements for initial and subsequent operation - describes the importance for evaluation and feedback of operating experience - describes the procedures for changes in hardware, procedures and set points - outlines the information flow and the requirements in reference to records and reports. (orig./RW)

  8. Safety training and safe operating procedures written for PBFA (Particle Beam Fusion Accelerator) II and applicable to other pulsed power facilities

    Energy Technology Data Exchange (ETDEWEB)

    Donovan, G.L.; Goldstein, S.A.

    1986-12-01

    To ensure that work in advancing pulsed power technology is performed with an acceptably low risk, pulsed power research facilities at Sandia National Laboratories must satisfy general safety guidelines established by the Department of Energy, policies and formats of the Environment, Safety, and Health (ES and H) Department, and detailed procedures formulated by the Pulsed Power Sciences Directorate. The approach to safety training and to writing safe operating procedures, and the procedures presented here are specific to the Particle Beam Fusion Accelerator II (PBFA II) Facility but are applicable as guidelines to other research and development facilities which have similar hazards.

  9. Safety training and safe operating procedures written for PBFA [Particle Beam Fusion Accelerator] II and applicable to other pulsed power facilities

    International Nuclear Information System (INIS)

    Donovan, G.L.; Goldstein, S.A.

    1986-12-01

    To ensure that work in advancing pulsed power technology is performed with an acceptably low risk, pulsed power research facilities at Sandia National Laboratories must satisfy general safety guidelines established by the Department of Energy, policies and formats of the Environment, Safety, and Health (ES and H) Department, and detailed procedures formulated by the Pulsed Power Sciences Directorate. The approach to safety training and to writing safe operating procedures, and the procedures presented here are specific to the Particle Beam Fusion Accelerator II (PBFA II) Facility but are applicable as guidelines to other research and development facilities which have similar hazards

  10. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  11. Safe injection procedures, injection practices, and needlestick ...

    African Journals Online (AJOL)

    Results: Safe injection procedures regarding final waste disposal were sufficiently adopted, while measures regarding disposable injection equipment, waste containers, hand hygiene, as well as injection practices were inadequately carried out. Lack of job aid posters that promote safe injection and safe disposal of ...

  12. 40 CFR 68.69 - Operating procedures.

    Science.gov (United States)

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including... instructions for safely conducting activities involved in each covered process consistent with the process...

  13. Safe operating envelope

    Energy Technology Data Exchange (ETDEWEB)

    Oliva, N [Ontario Hydro, Toronto, ON (Canada)

    1997-12-01

    Safe Operating Envelope is described representing: The outer bound of plant conditions within which day-to-day plant operation must be maintained in order to comply with regulatory requirements, associated safety design criteria and corporate nuclear safety goals. Figs.

  14. Safe operating envelope

    International Nuclear Information System (INIS)

    Oliva, N.

    1997-01-01

    Safe Operating Envelope is described representing: The outer bound of plant conditions within which day-to-day plant operation must be maintained in order to comply with regulatory requirements, associated safety design criteria and corporate nuclear safety goals. Figs

  15. Research on Operating Procedure Development in View of RCM Theory

    International Nuclear Information System (INIS)

    Shi, J.

    2015-01-01

    The operation of NPPs (nuclear power plants) is closely related to SSCs (Structure, System and Component) function implementations and failure recoveries, and strictly follows operating procedure. The philosophy of RCM (Reliability Centered Maintenance) which is a widely-used systematic engineering approach in industry focusing on likewise facility functions and effectiveness of maintenance is accepted in relative analysis of NPPs operation in this paper. Based on the theory of RCM, the paper will discuss general logic of operating procedure development and framework optimization as well combining NPPs engineering design. Since the quality of operating procedures has a significant impact on the safe and reliable operation of NPPs, the paper provides a proposed operating procedure development logic diagramme for reference for the procedure optimization task ahead. (author)

  16. Procedures for the Safe Transport of Radioactive Material

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jang Lyul; Chung, K. K.; Lee, J. I.; Chang, S. Y.; Lee, T. Y

    2007-11-15

    This technical report describes the procedure and work responsibility along with the regulation and standard necessary for the safe transport of radioactive or contaminated materials. This report, therefore, can be effectively used to secure the public safety as well as to prevent the disastrous event which might be resulted from the transport process of radioactive materials by establishing a procedure and method on the safe packing, handling and transport of radioactive materials.

  17. Intra-operative removal of chest tube in video-assisted thoracoscopic procedures

    Directory of Open Access Journals (Sweden)

    Moustafa M. El-Badry

    2017-12-01

    Conclusions: Intra-operative removal of chest tube during VATS procedures was a safe technique in well selected patients with an intra-operative successful air-leak test with radiological and clinical follow-up. This technique provided lesser post-operative pain with shorter hospital stay.

  18. A logic scheme for regulating safe operation of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, E E [Reactor Department, Nuclear Research Center, Atomic Energy Authority, Cairo (Egypt); Effat, A; Rahman, F A [Operational Saety Dept, National Center of Nuclear Safety and Radiation Control Atomic Energy Authority, Cairo (Egypt)

    1997-12-31

    This investigation presents a logic scheme for regulating the safe operation of research reactor in accordance with the new revision of SS-35 and revised by the 10 CFR. It emphasizes the regulatory inspection and enforcement (RI end E) during the reactor operation phase. IT is developed to provide information, guidance and recommendations to be taken when constructing the RI and E program that could be applied to the operational phase of the egyptian Research Reactors. In the operational phase, the regulatory inspection (RI) means an examination, observation, measurement, or test undertaken or on behalf of the nuclear regulatory body (NRB) during operation to verify that the nuclear materials, components, systems and structures as well operational activities, processes, procedures and personnel competence and performance are in accordance with the requirements established or the provisions approved by NRB or specified in the operational license or contained in regulations. Regulatory inspection includes both routine and non-routine ones. Any of them may be announced or unannounced. The problems identified by the RI must be resolved by the proper RE actions. The RE actions include investigative and corrective RE actions. These RI and E procedures for regulating safe operation of research reactors are presented as flow charts and then developed as a computer logic scheme. The software program is very efficient, very friendly, very simple and is interactive in nature such that the program asks the user certain questions about essential steps that guide the (RI and E) for research reactors, and user responds. The program proceeds based on this response until all the necessary steps for (RI and E) are accomplished. 5 figs.

  19. Biosafety Procedure for Safe Handling of Genetically Modified Plant Materials in Bio Design Facility

    International Nuclear Information System (INIS)

    Zaiton Ahmad; Shuhaimi Shamsudin; Mohamed Najli Mohamed Yasin; Affrida Abu Hassan; Mohd Zaid Hassan; Rusli Ibrahim

    2015-01-01

    Bio Design Facility is the specifically designed glass house for propagation, screening and analysis of high quality plant varieties developed through biotechnology or a combination of nuclear technology and biotechnology. High quality plant varieties especially genetically modified plants (GMO) require a special glass house facility for propagation and screening to isolate them from cross-pollinating with wild type varieties in surrounding ecosystem, and for carrying out evaluation of possible risks of the plants to human, animal and environment before they are proven safe for field trials or commercial release. This facility which was developed under the Ninth Malaysia Plan is classified as the Plant Containment Level 2 and is compliance with the bio safety regulations and guidance for the safe release of GMO according to Malaysian Bio safety Act 2007. Bio Design Facility is fully operational since 2010 and in 2012, it has also been certified as the glass house for post-entry quarantine by The Department of Agriculture. This paper summarizes the bio safety procedure for a safe, controlled and contained growing and evaluation of GMO in Bio Design Facility. This procedure covers the physical (containment and equipment's) and operational (including responsibility, code of practice, growing, decontamination and disposal of plant materials, emergency and contingency plan) aspects of the facility. (author)

  20. Outcome of Cesarean Myomectomy: Is it a Safe Procedure?

    Science.gov (United States)

    Senturk, Mehmet Baki; Polat, Mesut; Doğan, Ozan; Pulatoğlu, Çiğdem; Yardımcı, Oğuz Devrim; Karakuş, Resul; Tayyar, Ahter Tanay

    2017-11-01

    Myomectomy performed during cesarean section is still controversial because of the potential for associated complications, especially with large myomas. Many obstetricians avoid performing cesarean myomectomy procedures because of the risk of uncontrollable hemorrhage. However, the prevalence of pregnant women with myomas is increasing, leading to an increase in the likelihood that physicians will encounter this issue. The aim of this study was to compare outcomes and complications of patients who either had or did not have cesarean myomectomy. A total of 361 patients were evaluated in this retrospective study. Patients who had cesarean section with myomectomy and patients had cesarean section without myomectomy were compared with regard to demographics, drop in hemoglobin levels, complications, blood transfusion rates and duration of operation. These parameters were also compared when the diameter of the myoma was larger than 5 cm. Values of p  0.05), the mean myoma diameter was smaller and the duration of operation was longer in the group who underwent cesarean myomectomy (p  0.05). This study shows that myomectomy during cesarean section does not increase complications or transfusion rates and appears to be a safe procedure.

  1. Implementation of an Improved Safe Operating Envelope

    International Nuclear Information System (INIS)

    Prime, Robyn; McIntyre, Mark; Reeves, David

    2008-01-01

    This paper is a continuation of the paper presented at IYNC 2004 on 'The Definition of a Safe Operating Envelope'. The current paper concentrates on the implementation process of the Safe Operating Envelope employed at the Point Lepreau Generating Station. (authors)

  2. Implementation of an Improved Safe Operating Envelope

    Energy Technology Data Exchange (ETDEWEB)

    Prime, Robyn; McIntyre, Mark [NB Power Nuclear, P.O. Box 600, Lepreau, NB (Canada); Reeves, David [Atlantic Nuclear Services Ltd., PO Box 1268 Fredericton, NB (Canada)

    2008-07-01

    This paper is a continuation of the paper presented at IYNC 2004 on 'The Definition of a Safe Operating Envelope'. The current paper concentrates on the implementation process of the Safe Operating Envelope employed at the Point Lepreau Generating Station. (authors)

  3. Safe Operation of Critical Assemblies and Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-05-15

    This Manual is provided as a guide to the safe operation of critical assemblies and small research reactors. It is intended that it should be used by all authorities and persons concerned with, or responsible for, the use of such equipment, in addition to the scientists and technologists who are actually working with, or operating it. It is suggested that it will be of use to those wishing to design and manufacture, or purchase, critical assemblies or research reactors, as well as those already in possession of them, and that it will prove particularly helpful to those users who have no direct access to other collected sources of information. This Manual is not a set of rules or a code of practice, but a series of recommendations which must be interpreted with scientific judgement in their application to any particular problem. The guiding principles are given from which good operational procedures may be established and improved. The promulgation of rigid standards is both impossible and undesirable at the present time, since the topics discussed form part of a rapidly growing science and technology. Therefore, any recommendations made should not be used to restrict or inhibit future developments. The Manual is intended mainly for use in those Member States where there has been little experience in the operation of critical assemblies and research reactors. It has been compounded from the best practices which exist in Member States having a large amount of such experience, so that nothing in it should conflict with the best practices to be encountered in the field of safe operation.

  4. Safe Operation of Critical Assemblies and Research Reactors

    International Nuclear Information System (INIS)

    1961-01-01

    This Manual is provided as a guide to the safe operation of critical assemblies and small research reactors. It is intended that it should be used by all authorities and persons concerned with, or responsible for, the use of such equipment, in addition to the scientists and technologists who are actually working with, or operating it. It is suggested that it will be of use to those wishing to design and manufacture, or purchase, critical assemblies or research reactors, as well as those already in possession of them, and that it will prove particularly helpful to those users who have no direct access to other collected sources of information. This Manual is not a set of rules or a code of practice, but a series of recommendations which must be interpreted with scientific judgement in their application to any particular problem. The guiding principles are given from which good operational procedures may be established and improved. The promulgation of rigid standards is both impossible and undesirable at the present time, since the topics discussed form part of a rapidly growing science and technology. Therefore, any recommendations made should not be used to restrict or inhibit future developments. The Manual is intended mainly for use in those Member States where there has been little experience in the operation of critical assemblies and research reactors. It has been compounded from the best practices which exist in Member States having a large amount of such experience, so that nothing in it should conflict with the best practices to be encountered in the field of safe operation.

  5. Prepare to protect: Operating and maintaining a tornado safe room.

    Science.gov (United States)

    Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya

    2017-06-01

    Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.

  6. Safe operation of critical assemblies and research reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-09-15

    Some countries have accumulated considerable experience in the operation of these reactors and have in the process developed safe practices. On the other hand, other countries which have recently acquired, or will soon acquire, such reactors do not have sufficient background of experience with them to have developed full knowledge regarding their safe operation. In this situation, the International Atomic Energy Agency has considered that it would be useful to make available to all its Member States a set of recommendations on the safe operation of these reactors, based on the accumulated experience and best practices. The Director General accordingly nominated a Pane Ion Safe Operation of Critical Assemblies and Research Reactors to assist the Agency's Secretariat in drafting such recommendations

  7. The plant operating procedure information modeling system for creation and maintenance of procedures

    International Nuclear Information System (INIS)

    Fanto, S.V.; Petras, D.S.; Reiner, R.T.; Frost, D.R.; Orendi, R.G.

    1990-01-01

    This paper reports that as a result of the accident at Three Mile Island, regulatory requirements were issued to upgrade Emergency Operating Procedures for nuclear power plants. The use of human-factored, function-oriented, EOPs were mandated to improve human reliability and to mitigate the consequences of a broad range of initiating events, subsequent failures and operator errors, without having to first diagnose the specific events. The Westinghouse Owners Group responded by developing the Emergency Response Guidelines in a human-factored, two-column format to aid in the transfer of the improved technical information to the operator during transients and accidents. The ERGs are a network of 43 interrelated guidelines which specify operator actions to be taken during plant emergencies to restore the plant to a safe and stable condition. Each utility then translates these guidelines into plant specific EOPs. The creation and maintenance of this large web of interconnecting ERGs/EOPs is an extremely complex task. This paper reports that in order to aid procedure documentation specialists with this time-consuming and tedious task, the Plant Operating Procedure Information Modeling system was developed to provide a controlled and consistent means to build and maintain the ERGs/EOPs and their supporting documentation

  8. Standards for safe operation of research reactors

    International Nuclear Information System (INIS)

    1996-01-01

    The safety of research reactors is based on many factors such as suitable choice of location, design and construction according to the international standards, it also depends on well trained and qualified operational staff. These standards determine the responsibilities of all who are concerned with the research reactors safe operation, and who are responsible of all related activities in all the administrative and technical stages in a way that insures the safe operation of the reactor

  9. Standard operating procedure for combustion of 14C - samples with OX-500 biological material oxidizer

    International Nuclear Information System (INIS)

    Nashriyah Mat.

    1995-01-01

    This procedure is for the purpose of safe operation of OX-500 biological material oxidizer. For ease of operation, the operation flow chart (including testing the system and sample combustion) and end of day maintenance flow chart were simplified. The front view, diagrams and switches are duly copied from operating manual. Steps on sample preparation are also included for biotic and a biotic samples. This operating procedure is subjected to future reviews

  10. Chapter 8. Medical procedures. Recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza epidemic or mass disaster

    NARCIS (Netherlands)

    Zimmerman, Janice L.; Sprung, Charles L.; Christian, Michael D.; Camargo, Ruben; Ceraso, Daniel; Azoulay, Elie; Duguet, Alexandre; Guery, Benoit; Reinhart, Konrad; Adini, Bruria; Barlavie, Yaron; Benin-Goren, Odeda; Cohen, Robert; Klein, Motti; Leoniv, Yuval; Margalit, Gila; Rubinovitch, Bina; Sonnenblick, Moshe; Steinberg, Avraham; Weissman, Charles; Wolff, Donna; Kesecioglu, Jozef; de Jong, Menno; Moreno, Rui; An, Youzhong; Du, Bin; Joynt, Gavin M.; Colvin, John; Loo, Shi; Richards, Guy; Artigas, Antonio; Pugin, Jerome; Amundson, Dennis; Devereaux, Asha; Beigel, John; Danis, Marion; Farmer, Chris; Hick, John L.; Maki, Dennis; Masur, Henry; Rubinson, Lewis; Sandrock, Christian; Talmor, Daniel; Truog, Robert; Zimmerman, Janice; Brett, Steve; Montgomery, Hugh; Rhodes, Andrew; Sanderson, Frances; Taylor, Bruce

    2010-01-01

    To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on ensuring that adequate resources are available and appropriate protocols are developed to safely perform procedures in

  11. Procedure for following external nuclear power plant operating experience

    International Nuclear Information System (INIS)

    Kostadinov, V.

    2003-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed computer database and the procedure for following-up and investigating external nuclear operating experience and administrative requirements. The SNSA's primary goal is to investigate safety significant events in due time, to analyze them from the regulatory point of view and to ensure that meaningful lessons be learned and used for improvement of the safe operation of Slovenian Nuclear Power Plant Krsko. Moreover, we intend to make uniform format and method for reporting broader spectrum of events analyzed including low level event reporting. (author)

  12. Beyond Safe Operating Space: Finding Chemical Footprinting Feasible

    DEFF Research Database (Denmark)

    Posthuma, Leo; Bjørn, Anders; Zijp, Michiel C.

    2014-01-01

    undefined boundary in their selection of planetary boundaries delineating the “safe operating space for humanity”. Can we use the well-known concept of “ecological footprints” to express a chemical pollution boundary aimed at preventing the overshoot of the Earth’s capacity to assimilate environmental...... scenarios that allow us to avoid “chemical overshoot” beyond the Earth’s safe operating space....

  13. Is laparoscopic appendicectomy a safe procedure for trainees in the peripheral hospital setting?

    LENUS (Irish Health Repository)

    Emmanuel, A

    2011-10-01

    Laparoscopic appendicectomy has become standard in the treatment of acute appendicitis in most hospitals in Ireland. Studies have shown that it is a safe procedure for trainees to perform. However, these studies were conducted in university teaching hospitals whereas a significant proportion of training in Ireland takes place in peripheral hospitals which provide a different training environment. The aim of this study was to determine whether laparoscopic appendicectomy is a safe procedure for surgical trainees to perform in a peripheral hospital setting. A retrospective analysis was performed of appendicectomies carried out at a peripheral hospital over a 12 month period. Comparisons were made between consultant surgeons and trainees for a variety of outcomes. Of 155 appendicectomies, 129 (83.2%) were performed laparoscopically, of which 10 (7.75%) were converted to open. Consultants performed 99 (77%) laparoscopic appendicectomies. There were no statistically significant differences between consultants and trainees in complication rates (19 (19.2%) vs. 4 (13.3%), p = 0.46), mean length of hospital stay (4.7 +\\/- 4.0 vs. 3.4 +\\/- 3.3 days, p = 0.13), or rate of conversion to open operation (9 (9.1%) vs. 1 (3.3%), p = 0.45). For cases of complicated appendicitis there were no significant differences between consultants and trainees in complication rates (12 vs. 2, p = 0.40) or length of hospital stay (6.4 +\\/- 3.9 vs. 4.7 +\\/- 5.6 days, p = 0.27). We conclude that laparoscopic appendicectomy is a safe procedure for trainees to perform in the peripheral hospital setting and should be incorporated into surgical training programs at an early stage of training.

  14. Ensuring safe operation at the Loviisa nuclear power plant

    International Nuclear Information System (INIS)

    Regnell, B.

    1985-01-01

    Safe operation of a nuclear plant can be achieved only if the plant is designed according to stringent safety principles, if the construction and commissioning work meets high standards and finally if proper attention is paid to the safety aspects in all operational activities. Clearly formulated safety principles and standards are required for all these steps. In the early phases of the Loviisa project only a few IAEA codes of practice and safety guides were available. Their usefulness was, however, felt early, and valuable guidance was offered by them in formulating the quality assurance programme, for example. The paper describes the approach taken in order to achieve high operational safety at the first nuclear power station in Finland, the Loviisa plant. The involvement in the project of the plant owner, Imatran Voima Oy (IVO), was very large, the company serving as its own architect-engineer. Experience has shown that the thorough knowledge of the plant, down to the finest details, obtained by extensive participation in design, erection and commissioning of the plant, is invaluable in the actual operation of the plant. This manifests itself most clearly in the event of malfunctions and incidents or if modifications have to be undertaken. Many different activities affecting the operational safety can be identified: actual operation of the plant, including the creation and maintaining of technical specifications, procedures, instructions, documentation systems, etc.; maintenance, repair and modification work; in-service inspection and testing practices; component failure data collection and analysis; incident reporting, collection and evaluation systems; operator training; quality assurance programme; procedures and implementation; reviews of operational safety by an independent safety committee; and supervision by the safety authorities. In the paper, all these activities are described in some detail. (author)

  15. Basic national requirements for safe design, construction and operation

    International Nuclear Information System (INIS)

    Franzen, L.F.

    1980-01-01

    Nuclear power plants have to be save. Vendors and utilities operating such plants, are convinced that their plants meet this requirement. Who, however, is establishing the safety requirements to be met by those manufacturing and operating nuclear power plants. What are the mechanisms to control whether the features provided assure the required safety level. Who controls whether the required and planned safety features are really provided. Who is eventually responsible for assuring safety after commissioning of a nuclear power plant. These fundamental questions being raised in many discussions on safety and environmental protection are dealt with in the following sections: (1) Fundamental safety requirements on nuclear power plants, in which such items as risk, legal bases and licensing procedure are discussed, (2) Surveillance during construction, in which safety analysis report, siting, safety evaluation, document examination, quality assurance, and commissioning testing are dealt with, (3) Operating tests and conditions in which recurrent inspections, environmental protection during operation, investigation of abnormal occurences and backfitting requirements as reviewed, and (4) Safety philosophy and safety policy to conclude this presentation. The German approach to nuclear safety serves as an example for an effective way of assuring safe nuclear power. (orig.)

  16. A guide to safe field operations

    Science.gov (United States)

    Yobbi, D.K.; Yorke, T.H.; Mycyk, R.T.

    1996-01-01

    Most functions of the U.S. Geological Survey (USGS), Water Resources Division (WRD) require employees to participate in numerous field activities ranging from routine meetings with cooperators, other federal and public officials, and private citizens to potentially hazardous assignments, such as making flood measurements and scuba diving to service underwater instruments. It is paramount that each employee be aware of safety procedures and operational policies of the WRD to ensure that (1) their activities avoid or minimize personal injury to the employee, coworkers, or anyone in the vicinity of the field activity, and (2) their conduct does not infringe on the personal or property rights of any individual or organization. The purpose of the guide is to familiarize employees with the operational and safety procedures expected to be followed by each employee as a representative of the WRD. It is also intended as a training tool for all new employees and a document to be reviewed by each employee before undertaking a field assignment. It includes general procedures that are standard and applicable to all field operations, such as communication, vehicle operation, and adequate preparation for anticipated weather conditions. It also includes a discussion of specific procedures and safety considerations for most of the routine field assignments undertaken by hydrologists and hydrologic technicians of the WRD. The guide is not intended to be a technical handbook outlining step-by-step procedures for performing specific tasks or a comprehensive discussion of every possible activity that may be undertaken by a USGS employee. Employees are referred to the Techniques for Water-Resources Investigations (TWRI) series for specific technical procedures and to the U.S. Geological Survey Safety and Environmental Health Handbook 445-1-H (USGS, August 1989), USGS Occupational Hazards and Safety Procedures Handbook 445-2-H (December 1993), the WRD notebook on Safety Policy and

  17. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  18. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2000-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  19. Method of safely operating nuclear reactor

    International Nuclear Information System (INIS)

    Ochiai, Kanehiro.

    1976-01-01

    Purpose: To provide a method of safely operating an nuclear reactor, comprising supporting a load applied to a reactor container partly with secondary container facilities thereby reducing the load borne by the reactor container when water is injected into the core to submerge the core in an emergency. Method: In a reactor emergency, water is injected into the reactor core thereby to submerge the core. Further, water is injected into a gap between the reactor container and the secondary container facilities. By the injection of water into the gap between the reactor container and the secondary container facilities a large apparent mass is applied to the reactor container, as a result of which the reactor container undergoes the same vibration as that of the secondary container facilities. Therefore, the load borne by the reactor container itself is reduced and stress at the bottom part of the reactor container is released. This permits the reactor to be operated more safely. (Moriyama, K.)

  20. Embracing Safe Ground Test Facility Operations and Maintenance

    Science.gov (United States)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  1. Safeguards Automated Facility Evaluation (SAFE) methodology

    International Nuclear Information System (INIS)

    Chapman, L.D.; Grady, L.M.; Bennett, H.A.; Sasser, D.W.; Engi, D.

    1978-01-01

    The SAFE procedure is an efficient method of evaluating the physical protection system of a nuclear facility. Since the algorithms used in SAFE for path generation and evaluation are analytical, many paths can be evaluated with a modest investment in computer time. SAFE is easy to use because the information required is well-defined and the interactive nature of this procedure lends itself to straightforward operation. The modular approach that has been taken allows other functionally equivalent modules to be substituted as they become available. The SAFE procedure has broad applications in the nuclear facility safeguards field as well as in the security field in general. Any fixed facility containing valuable materials or components to be protected from theft or sabotage could be analyzed using this same automated evaluation technique

  2. Safe Reentry for False Aneurysm Operations in High-Risk Patients.

    Science.gov (United States)

    Martinelli, Gian Luca; Cotroneo, Attilio; Caimmi, Philippe Primo; Musica, Gabriele; Barillà, David; Stelian, Edmond; Romano, Angelo; Novelli, Eugenio; Renzi, Luca; Diena, Marco

    2017-06-01

    In the absence of a standardized safe surgical reentry strategy for high-risk patients with large or anterior postoperative aortic false aneurysm (PAFA), we aimed to describe an effective and safe approach for such patients. We prospectively analyzed patients treated for PAFA between 2006 and 2015. According to the preoperative computed tomography scan examination, patients were divided into two groups according to the anatomy and extension of PAFA: in group A, high-risk PAFA (diameter ≥3 cm) developed in the anterior mediastinum; in group B, low-risk PAFA (diameter <3 cm) was situated posteriorly. For group A, a safe surgical strategy, including continuous cerebral, visceral, and coronary perfusion was adopted before resternotomy; group B patients underwent conventional surgery. We treated 27 patients (safe reentry, n = 13; standard approach, n = 14). Mean age was 60 years (range, 29 to 80); 17 patients were male. Mean interval between the first operation and the last procedure was 4.3 years. Overall 30-day mortality rate was 7.4% (1 patient in each group). No aorta-related mortality was observed at 1 and 5 years in either group. The Kaplan-Meier overall survival estimates at 1 and 5 years were, respectively, 92.3% ± 7.4% and 73.4% ± 13.4% in group A, and 92.9% ± 6.9% and 72.2% ± 13.9% in group B (log rank test, p = 0.830). Freedom from reoperation for recurrent aortic disease was 100% at 1 year and 88% at 5 years. The safe reentry technique with continuous cerebral, visceral, and coronary perfusion for high-risk patients resulted in early and midterm outcomes similar to those observed for low-risk patients undergoing conventional surgery. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  3. Comparing the operators' behavior in conducting emergency operating procedures with the complexity of procedural steps

    International Nuclear Information System (INIS)

    Park, Jin Kyun; Jung, Won Dea

    2003-01-01

    Many kinds of procedures have been used to reduce the operators' workload throughout various industries. However, significant portion of accidents or incidents was caused by procedure related human errors that are originated from non-compliance of procedures. According to related studies, several important factors for non-compliance behavior have been identified, and one if them is the complexity of procedures. This means that comparing the change of the operators' behavior with the complexity of procedures may be meaningful for investigating plausible reasons for the operators' non-compliance behavior. In this study, emergency training records were collected using a full scope simulator in order to obtain data related to the operators' non-compliance behavior. And then, collected data are compared with the complexity of procedural steps. As the result, two remarkable relationships are found, which indicate that the operators' behavior could be reasonably characterized by the complexity of procedural steps. Thus, these relationships can be used as meaningful clues not only to scrutinize the reason of non-compliance behavior but also to suggest appropriate remedies for the reduction of non-compliance behavior that can result in procedure related human errors

  4. MRI-guided stereotactic neurosurgical procedures in a diagnostic MRI suite: Background and safe practice recommendations.

    Science.gov (United States)

    Larson, Paul S; Willie, Jon T; Vadivelu, Sudhakar; Azmi-Ghadimi, Hooman; Nichols, Amy; Fauerbach, Loretta Litz; Johnson, Helen Boehm; Graham, Denise

    2017-07-01

    The development of navigation technology facilitating MRI-guided stereotactic neurosurgery has enabled neurosurgeons to perform a variety of procedures ranging from deep brain stimulation to laser ablation entirely within an intraoperative or diagnostic MRI suite while having real-time visualization of brain anatomy. Prior to this technology, some of these procedures required multisite workflow patterns that presented significant risk to the patient during transport. For those facilities with access to this technology, safe practice guidelines exist only for procedures performed within an intraoperative MRI. There are currently no safe practice guidelines or parameters available for facilities looking to integrate this technology into practice in conventional MRI suites. Performing neurosurgical procedures in a diagnostic MRI suite does require precautionary measures. The relative novelty of technology and workflows for direct MRI-guided procedures requires consideration of safe practice recommendations, including those pertaining to infection control and magnet safety issues. This article proposes a framework of safe practice recommendations designed for assessing readiness and optimization of MRI-guided neurosurgical interventions in the diagnostic MRI suite in an effort to mitigate patient risk. The framework is based on existing clinical evidence, recommendations, and guidelines related to infection control and prevention, health care-associated infections, and magnet safety, as well as the clinical and practical experience of neurosurgeons utilizing this technology. © 2017 American Society for Healthcare Risk Management of the American Hospital Association.

  5. Writer`s guide for technical procedures

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    A primary objective of operations conducted in the US Department of Energy (DOE) complex is safety. Procedures are a critical element of maintaining a safety envelope to ensure safe facility operation. This DOE Writer`s Guide for Technical Procedures addresses the content, format, and style of technical procedures that prescribe production, operation of equipment and facilities, and maintenance activities. The DOE Writer`s Guide for Management Control Procedures and DOE Writer`s Guide for Emergency and Alarm Response Procedures are being developed to assist writers in developing nontechnical procedures. DOE is providing this guide to assist writers across the DOE complex in producing accurate, complete, and usable procedures that promote safe and efficient operations that comply with DOE orders, including DOE Order 5480.19, Conduct of Operations for DOE Facilities, and 5480.6, Safety of Department of Energy-Owned Nuclear Reactors.

  6. SAFE-P: System for Assurance of Flight Executable Procedures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA operates manned spacecraft according to rigorously-defined standard operating procedures. Unfortunately, operating procedures are often written in different...

  7. Unmanned Aerial Systems Traffic Management (UTM): Safely Enabling UAS Operations in Low-Altitude Airspace

    Science.gov (United States)

    Rios, Joseph

    2016-01-01

    Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS flight operations. Given this, and understanding that the FAA faces a mandate to modernize the present air traffic management system through computer automation and significantly reduce the number of air traffic controllers by FY 2020, the FAA maintains that a comprehensive, yet fully automated UAS traffic management (UTM) system for low-altitude airspace is needed. The concept of UTM is to begin by leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today. Building on its legacy of work in air traffic management (ATM), NASA is working with industry to develop prototype technologies for a UAS Traffic Management (UTM) system that would evolve airspace integration procedures for enabling safe, efficient low-altitude flight operations that autonomously manage UAS operating in an approved low-altitude airspace environment. UTM is a cloud-based system that will autonomously manage all traffic at low altitudes to include UASs being operated beyond visual line of sight of an operator. UTM would thus enable safe and efficient flight operations by providing fully integrated traffic management services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning re-routing, separation management, sequencing spacing, and contingency management. UTM removes the need for human operators to continuously monitor aircraft operating in approved areas. NASA envisions concepts for two types of UTM systems. The first would be a small portable system, which could be moved between geographical areas in support of operations such as precision agriculture and public safety. The second would be a Persistent system, which would support low-altitude operations in an approved area by providing continuous automated

  8. Developing, adopting and adapting operating procedures

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture specifies all the dispositions which have been taken by EDF Nuclear and Fossil Generation Department - according to the fact that availability and safety largely depend on the quality of the procedures and their easy handling - in order to develop, adopt and adapt the operating procedures. The following points are treated: General organization of procedures for plant operation during normal and abnormal conditions; Personnel and extend of responsibility involved into the development of procedures (research center, training center, specialized services, nuclear station, etc.); Validation of the procedures by means of full-scope simulators; Modifications of the procedures taking into account operation experience in material and human fields; Development of simulation softs in order to perform the procedures in abnormal situations; Evolution of operating technics and future skills. (orig.)

  9. A knowledge-based operator advisor system for integration of fault detection, control, and diagnosis to enhance the safe and reliable operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bhatnagar, R.

    1989-01-01

    A Knowledged-Based Operator Advisor System has been developed for enhancing the complex task of maintaining safe and reliable operation of nuclear power plants. The operator's activities have been organized into the four tasks of data interpretation for abstracting high level information from sensor data, plant state monitoring for identification of faults, plan execution for controlling the faults, and diagnosis for determination of root causes of faults. The Operator Advisor System is capable of identifying the abnormal functioning of the plant in terms of: (1) deviations from normality, (2) pre-enumerated abnormal events, and (3) safety threats. The classification of abnormal functioning into the three categories of deviations from normality, abnormal events, and safety threats allows the detection of faults at three levels of: (1) developing faults, (2) developed faults, and (3) safety threatening faults. After the identification of abnormal functioning the system will identify the procedures to be executed to mitigate the consequences of abnormal functioning and will help the operator by displaying the procedure steps and monitoring the success of actions taken. The system also is capable of diagnosing the root causes of abnormal functioning. The identification, and diagnosis of root causes of abnormal functioning are done in parallel to the task of procedure execution, allowing the detection of more critical safety threats while executing procedures to control abnormal events

  10. Importance of safety review to the safe operation of a nuclear plant

    International Nuclear Information System (INIS)

    Brinkerhoff, L.C.

    1978-01-01

    Widely differing standards of construction of nuclear reactors are employed in different countries. Although the reactor vendors, including designers and construction contractors, have a vested interest in safety, the ultimate responsibility for safety rests with the reactor facility operator. Even though governmental agencies, either directly or indirectly, must take a strong lead in developing policies and practices of safe operation, the reactor facility operator must recognize and accept the full responsibility for safe operation of the facility. The policies and practices of safe operation imposed by governmental agencies must help assure the prudent operation and the adequate maintenance of those structures, systems, and components of importance to safety. Since each country has a slightly different philosophy for achieving safety and each vendor utilizes different structures, systems, and components to fulfil this philosophy, it is imperative that the facility operator adequately maintain those engineered safety features and those plant protective systems which have been engineered into achieving the desired levels of safety. An additional method of helping to assure that those structures, systems, and components of importance to safety are prudently operated and adequately maintained is to assign the full safety responsibility for the overall operations of the reactor facility to the operating organization, i.e. assigning a 'line of responsibility' within the reactor facility operator. This assurance can be further strengthened by requiring that the facility operator establish a safety review body that overviews the operation and assures that the operating organization complies with those policies and practices of safe operation which have been imposed on the reactor facility. (author)

  11. Digital image monitoring to optimise safe port operation

    CSIR Research Space (South Africa)

    Phelp, D

    2008-11-01

    Full Text Available This paper describes a low cost video system ‘Harbour Watch’, which can be used to support safe port operations, especially in developing countries. Preset digital images are geo-referenced and then archived for later analysis to improve...

  12. Safe and economic performance of nuclear power plant. Operation through meticulous Q/A programmes - a german example

    International Nuclear Information System (INIS)

    Schenk, H.J.

    1989-01-01

    Safe and reliable operation of a nuclear power plant over its life time of 40 to 60 years is the essential condition for an economic performance. This goal can be achieved by a qualified responsible staff realizing a high quality of operation and by maintaining high quality and technical standards in the plant in accordance with the status of science and technology. Quality assurance procedures have to verify this in detail, in close contact with the work to be performed. In this presentation I would like to describe our approach in Philippsburg to cope with this task

  13. Safe Operation of Nuclear Power Plants. Code of Practice and Technical Appendices

    International Nuclear Information System (INIS)

    1969-01-01

    This book is in two parts. The first is a Code of Practice for the Safe Operation of Nuclear Power Plants and the second part is a compilation of technical appendices. Its object is to give information and illustrative examples that would be helpful in implementing the Code of Practice. This second part, although published under the same cover, is not part of the Code. Safe operation of a nuclear power plant postulates suitable siting and proper design, construction and management of the plant. Under the present Code of Practice for the Safe Operation of Nuclear Power Plants, those intending to operate the plant are recommended to prepare documentation which would deal with its operation and include safety analyses. The documentation in question would be reviewed by a regulatory body independent of the operating organization; operation would be authorized on the understanding that it would comply with limits and conditions designed to ensure safety. The Code may be subject to revision in the light of experience. The Appendices provide additional information together with some examples relating to certain topics dealt with in the Code; it must be emphasized that they are included as examples for information only and are not part of any recommendation. Purpose and scope: The recommendations in the Code are designed to protect the general public and the operating personnel from radiation hazards, and the Code forms part of the Agency's Safety Standards. The Code, which should be used in conjunction with the Agency's other Safety Standards, provides guidance and information to persons and authorities responsible for the operation of stationary nuclear power plants whose main function is the generation of thermal, mechanical or electrical power; it is not intended to apply to reactors used solely for experimental or research purposes. It sets forth minimum requirements which, it is believed, in the light of experience, must be met in order to achieve safe operation of a

  14. Systems for the safe operation of the JET tokamak with tritium

    International Nuclear Information System (INIS)

    Stork, D.; Ageladarakis, P.; Bell, A.C.

    1999-01-01

    In 1997, the JET device was operated for an extensive campaign with deuterium-tritium (D-T) plasmas (the DTE1 campaign). A comprehensive network of machine protection systems was necessary so that this experimental campaign could be executed safely without damage to the machine or release of activated material. This network had been developed over many years of JET deuterium plasma operation and therefore the modifications for D-T operation was not a significant problem. The DTE1 campaign was executed successfully and safely and the machine protection systems proved reliable and robust and, in the limited cases where they were required to act, functioned correctly. The machine protection systems at JET are described and their categorisation and development over time are summarised. The management, commissioning and operational experience during DTE1 are discussed and some examples of fault scenarios are described. The experience with protection systems at JET highlights the importance of correct design and philosophy decisions being taken at an early stage. It is shown that this experience will be invaluable data input to the safe operation of future large fusion machines. (orig.)

  15. Electronic Procedures for Medical Operations

    Science.gov (United States)

    2015-01-01

    Electronic procedures are replacing text-based documents for recording the steps in performing medical operations aboard the International Space Station. S&K Aerospace, LLC, has developed a content-based electronic system-based on the Extensible Markup Language (XML) standard-that separates text from formatting standards and tags items contained in procedures so they can be recognized by other electronic systems. For example, to change a standard format, electronic procedures are changed in a single batch process, and the entire body of procedures will have the new format. Procedures can be quickly searched to determine which are affected by software and hardware changes. Similarly, procedures are easily shared with other electronic systems. The system also enables real-time data capture and automatic bookmarking of current procedure steps. In Phase II of the project, S&K Aerospace developed a Procedure Representation Language (PRL) and tools to support the creation and maintenance of electronic procedures for medical operations. The goal is to develop these tools in such a way that new advances can be inserted easily, leading to an eventual medical decision support system.

  16. Safety analysis to support a safe operating envelope for fuel

    International Nuclear Information System (INIS)

    Gibb, R.A.; Reid, P.J.

    1998-01-01

    This paper presents an approach for defining a safe operating envelope for fuel. 'Safe operating envelope' is defined as an envelope of fuel parameters defined for application in safety analysis that can be related to, or used to define, the acceptable range of fuel conditions due to operational transients or deviations in fuel manufacturing processes. The paper describes the motivation for developing such a methodology. The methodology involved four steps: the update of fission product inventories, the review of sheath failure criteria, a review of input parameters to be used in fuel modelling codes, and the development of an improved fission product release code. This paper discusses the aspects of fuel sheath failure criteria that pertain to operating or manufacturing conditions and to the evaluation and selection of modelling input data. The other steps are not addressed in this paper since they have been presented elsewhere. (author)

  17. Operating-procedure system at Savannah River Plant

    International Nuclear Information System (INIS)

    Tope, C.W.

    1981-05-01

    Three types of procedures are widely used at SRP: Du Pont Savannah Operating Logsheet, Du Pont Savannah Operating Procedure, and Plant Manual. This document briefly reviews originating of the procedures, their preparation, control, and indexing

  18. Operationalizing safe operating space for regional social-ecological systems.

    Science.gov (United States)

    Hossain, Md Sarwar; Dearing, John A; Eigenbrod, Felix; Johnson, Fiifi Amoako

    2017-04-15

    This study makes a first attempt to operationalize the safe operating space concept at a regional scale by considering the complex dynamics (e.g. non-linearity, feedbacks, and interactions) within a systems dynamic model (SD). We employ the model to explore eight 'what if' scenarios based on well-known challenges (e.g. climate change) and current policy debates (e.g. subsidy withdrawal). The findings show that the social-ecological system in the Bangladesh delta may move beyond a safe operating space when a withdrawal of a 50% subsidy for agriculture is combined with the effects of a 2°C temperature increase and sea level rise. Further reductions in upstream river discharge in the Ganges would push the system towards a dangerous zone once a 3.5°C temperature increase was reached. The social-ecological system in Bangladesh delta may be operated within a safe space by: 1) managing feedback (e.g. by reducing production costs) and the slow biophysical variables (e.g. temperature, rainfall) to increase the long-term resilience, 2) negotiating for transboundary water resources, and 3) revising global policies (e.g. withdrawal of subsidy) that negatively impact at regional scales. This study demonstrates how the concepts of tipping points, limits to adaptations, and boundaries for sustainable development may be defined in real world social-ecological systems. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  19. Identification of efforts required for continued safe operation of KANUPP

    International Nuclear Information System (INIS)

    Ghafoor, M.A.; Hashmi, J.A.; Siddiqui, Z.H.

    1991-01-01

    are committed to upgrade the safety as far as possible, towards current standards and criteria. We are already modernizing our operational safety practices. We also intend to update our safety analysis, to confirm the current standards and criteria which are applicable in the context of the original plant design, and implement corresponding equipment upgrades where feasible, or special procedures to compensate where possible. This paper identifies the diverse upgrading efforts required in these three major areas, i.e. obsolescence, ageing and safety. A cost-benefit criterion is envisaged to prioritize their implementation with the available resources, to keep Kanupp operating safely, even beyond its originally intended lifespan. (author)

  20. Identification of efforts required for continued safe operation of KANUPP

    Energy Technology Data Exchange (ETDEWEB)

    Ghafoor, M A; Hashmi, J A; Siddiqui, Z H [Karachi Nuclear Power Plant, Karachi (Pakistan)

    1991-04-01

    are committed to upgrade the safety as far as possible, towards current standards and criteria. We are already modernizing our operational safety practices. We also intend to update our safety analysis, to confirm the current standards and criteria which are applicable in the context of the original plant design, and implement corresponding equipment upgrades where feasible, or special procedures to compensate where possible. This paper identifies the diverse upgrading efforts required in these three major areas, i.e. obsolescence, ageing and safety. A cost-benefit criterion is envisaged to prioritize their implementation with the available resources, to keep Kanupp operating safely, even beyond its originally intended lifespan. (author)

  1. Operating procedures and safety culture

    International Nuclear Information System (INIS)

    Carnino, A.

    1993-01-01

    The development of new technologies in recent years has led to a tremendous increase in the information to be mastered by operators in industrial processes. The information at operators disposal both in routine situations and accidental ones needs to be well prepared and organized to ensure reliability and safety. The man-machine interface should give operators all the necessary and clear indications on the process status and evolution so that the operators can operate the installation through adequate procedures. Procedures represent the real interface and mode of action of the operators on the machine, and they are of prime importance. Although they are by essence quite different, the routine, accident, and emergency procedures have in common one attribute: They all require a good safety culture both in their development and their implementation. From the definition given by the members of the International Nuclear Safety Advisory Group (INSAG), open-quotes Safety culture is that assembly of characteristics and attitudes in organizations and individuals which establishes that, as an overriding priority, nuclear plant safety issues receive the attention warranted by their significance,close quotes one can see that two aspects are embedded, a collective attitude that in fact is reflected in the managerial framework and an individual one that is linked to personnel behavior and work practices

  2. Operability test procedure for PFP wastewater sampling facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter

  3. Operational procedures - industry observations and opportunities for improvement

    International Nuclear Information System (INIS)

    Davey, E.

    2003-01-01

    The purpose of this paper is to relate some of the commonly encountered problems with operational procedures in the nuclear industry and offer practical suggestions for their elimination. The paper is based on recent consultant experience in assisting industry clients with human performance related design and assessment initiatives. Operational procedures are a key part of an integrated system design. Procedures provide the specified instructions for actions people are to undertake in operating a facility to achieve production and safety goals. While organizations continue to make substantial investments in procedure development and maintenance, problems with procedures continue to occur, as evidenced through operating inefficiencies, errors, and events. The paper reviews the role procedures play in facility operations, comments on current development and maintenance practices, discusses the extent of human performance related problems attributed to procedure deficiencies, reviews commonly encountered problems with design and implementation of procedures, and offers suggestions on how some of these issues might be addressed in the future. (author)

  4. [Prevention of adverse effects in latex allergic patients: organizing a latex safe operating theatre].

    Science.gov (United States)

    Bonalumi, Sabrina; Barbonaglia, Patrizia; Bertocchi, Carmen

    2006-01-01

    In 2001 the General Health Direction of Region Lombardia approved (decree n. 22303) a guideline for the prevention of latex allergic reactions in patients and health care workers. This document provides general recommendations in order to standardize behaviors in regional health care facilities. The reason is due to a rise in the incident of reactions to latex products in the last 20 years. Nowadays the prevalence is higher in certain risk groups (subjected to frequent and repeated exposures) rather than the general population. The aim of the project was to organize a latex safe operating theatre in the Ospedale Maggiore Policlinico, Mangiagalli e Regina Elena of Milan (Fondazione) and to standardize behaviors in order to prevent adverse effects in latex allergic patients. Thanks to the literature review and the creation of a multidisciplinar team, we produced a protocol. Therefore, we requested manufacturers the certification of the latex content of their products. Results and conclusion. When latex allergic patients need to undergone surgery in our hospital, a latex safe operating theatre is organized by personnel following a multidisciplinar protocol. No allergic reactions were experienced during surgical procedures after the creation of an environment as free as possible from latex contamination. The project will involve an emergency room, one room or more of a ward and of the outpatients department.

  5. Making operations on standard-library containers strongly exception safe

    DEFF Research Database (Denmark)

    Katajainen, Jyrki

    2007-01-01

    -library containers to provide the strong guarantee of exception safety, instead of the default guarantee, without violating the stringent performance requirements specified in the C++ standard. In particular, we show that every strongly exception-safe operation on dynamic arrays and ordered dictionaries is only...... a constant factor slower than the corresponding default-guarantee operation. In terms of the amount of space, the overhead introduced is linear in the number of elements stored....

  6. FFTF reactor plant procedures plan

    International Nuclear Information System (INIS)

    1972-01-01

    The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF

  7. Management for nuclear power plants for safe operation

    International Nuclear Information System (INIS)

    Kueffer, K.

    1981-01-01

    This lecture covers management aspects which have an immediate bearing on safety and identifies the objectives and tasks of management which are required for safe operation of a nuclear power plant and is based on the Codes of Practice and Safety Guides of the IAEA as well as arrangements in use at the Swiss Nuclear Power Station Beznau. (orig./RW)

  8. 21 CFR 120.6 - Sanitation standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Sanitation standard operating procedures. 120.6... Provisions § 120.6 Sanitation standard operating procedures. (a) Sanitation controls. Each processor shall have and implement a sanitation standard operating procedure (SSOP) that addresses sanitation...

  9. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  10. Simple Automatic File Exchange (SAFE) to Support Low-Cost Spacecraft Operation via the Internet

    Science.gov (United States)

    Baker, Paul; Repaci, Max; Sames, David

    1998-01-01

    Various issues associated with Simple Automatic File Exchange (SAFE) are presented in viewgraph form. Specific topics include: 1) Packet telemetry, Internet IP networks and cost reduction; 2) Basic functions and technical features of SAFE; 3) Project goals, including low-cost satellite transmission to data centers to be distributed via an Internet; 4) Operations with a replicated file protocol; 5) File exchange operation; 6) Ground stations as gateways; 7) Lessons learned from demonstrations and tests with SAFE; and 8) Feedback and future initiatives.

  11. Improving the safety and quality of nursing care through standardized operating procedures in Bosnia and Herzegovina.

    Science.gov (United States)

    Ausserhofer, Dietmar; Rakic, Severin; Novo, Ahmed; Dropic, Emira; Fisekovic, Eldin; Sredic, Ana; Van Malderen, Greet

    2016-06-01

    We explored how selected 'positive deviant' healthcare facilities in Bosnia and Herzegovina approach the continuous development, adaptation, implementation, monitoring and evaluation of nursing-related standard operating procedures. Standardized nursing care is internationally recognized as a critical element of safe, high-quality health care; yet very little research has examined one of its key instruments: nursing-related standard operating procedures. Despite variability in Bosnia and Herzegovina's healthcare and nursing care quality, we assumed that some healthcare facilities would have developed effective strategies to elevate nursing quality and safety through the use of standard operating procedures. Guided by the 'positive deviance' approach, we used a multiple-case study design to examine a criterion sample of four facilities (two primary healthcare centres and two hospitals), collecting data via focus groups and individual interviews. In each studied facility, certification/accreditation processes were crucial to the initiation of continuous development, adaptation, implementation, monitoring and evaluation of nursing-related SOPs. In one hospital and one primary healthcare centre, nurses working in advanced roles (i.e. quality coordinators) were responsible for developing and implementing nursing-related standard operating procedures. Across the four studied institutions, we identified a consistent approach to standard operating procedures-related processes. The certification/accreditation process is enabling necessary changes in institutions' organizational cultures, empowering nurses to take on advanced roles in improving the safety and quality of nursing care. Standardizing nursing procedures is key to improve the safety and quality of nursing care. Nursing and Health Policy are needed in Bosnia and Herzegovina to establish a functioning institutional framework, including regulatory bodies, educational systems for developing nurses' capacities or the

  12. Laparoscopic posterior mesh rectopexy for rectal prolapse is a safe procedure in older patients

    DEFF Research Database (Denmark)

    Dyrberg, D L; Nordentoft, T; Rosenstock, S

    2015-01-01

    to 1 June 2012, 81 laparoscopic posterior rectopexies were done. Male-to-female ratio was 4:77, median age 73 [57-80.5] years and median ASA Grade 2. Conversion to open surgery was done in 6.2%, the median operating time was 82 min [66 - 102] and median length of hospital stay was 2 days [2-5.7]. Minor...... and major complications were seen in 5.3% and 14.8%, respectively. The 30-day mortality rate was 1.2%. Constipation or incontinence improved or disappeared in 65.2% and 74.4%, respectively. The cumulated recurrence rate was 11.1% after a median observation time of 2 years. CONCLUSION: Laparoscopic posterior...... rectopexy is a safe and well-tolerated procedure in older patients and can be done with acceptable complications and recurrence rates and short hospital stays. Laparoscopic posterior rectopexy seems to improve bowel function in many patients....

  13. Management of nuclear power plants for safe operation

    International Nuclear Information System (INIS)

    1984-01-01

    This Guide identifies the main objectives and responsibilities of management with respect to safe operation of nuclear power plants. The Guide discusses the factors to be considered in structuring the operating organization to meet these objectives, to establish the management programmes that assure the safety tasks are performed, and to see that the services and facilities needed to accomplish the tasks are available. The Guide is primarily addressed to safety matters directly related to the operating phase. It assumes, in other words, that the safety aspects of siting, design, manufacturing and construction have been resolved. However, it also covers the interrelationships between operations and design, construction and commissioning, including the involvement of the operating organization in appropriate reviews of safety issues with reference to the future operating phase. The Guide is mainly restricted to matters of principle in relation to management-level decision making aimed at establishing safety policies. It is therefore not suitable for implementing such policies at the operational level. The IAEA Codes of Practice and Safety Guides provide detailed guidance for the latter purpose in those areas considered appropriate

  14. The operators' non-compliance behavior to conduct emergency operating procedures--comparing with the work experience and the complexity of procedural steps

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea

    2003-01-01

    Many kinds of procedures have been used to reduce the operators' workload throughout various industries, such as in the aviation, the chemical and the nuclear industry. It is remarkable that, however, significant portion of accidents or incidents was caused by procedure related human error due to non-compliance of procedures. In this study, to investigate the operators' non-compliance behavior, emergency-training records were collected using a full scope simulator. And three types of the operators' behavior (such as strict adherence, skipping redundant actions and modifying action sequences) observed from collected emergency training records were compared with both their work experience and the complexity of procedural steps. As the results, three remarkable relationships are obtained. They are: (1) the operators who have an intermediate work experience seem to frequently adopt non-compliance behavior to conduct the procedural steps, (2) the operators seem to frequently adopt non-compliance behavior to conduct the procedural steps that have an intermediate procedural complexity, and (3) the senior reactor operators seem to accommodate their non-compliance behavior based on the complexity of procedural steps. Therefore, it is expected that these relationships can be used as meaningful clues not only to scrutinize the reason for non-compliance behavior but also to suggest appropriate remedies for the reduction of non-compliance behavior that can result in procedure related human error

  15. Operator behaviors observed in following emergency operating procedure under a simulated emergency

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Park, Jin Kyun

    2012-01-01

    A symptom-based procedure with a critical safety function monitoring system has been established to reduce the operator's diagnosis and cognitive burden since the Three-Mile Island (TMI) accident. However, it has been reported that a symptom-based procedure also requires an operator's cognitive efforts to cope with off-normal events. This can be caused by mismatches between a static model, an emergency operating procedure (EOP), and a dynamic process, the nature of an ongoing situation. The purpose of this study is to share the evidence of mismatches that may result in an excessive cognitive burden in conducting EOPs. For this purpose, we analyzed simulated emergency operation records and observed some operator behaviors during the EOP operation: continuous steps, improper description, parameter check at a fixed time, decision by information previously obtained, execution complexity, operation by the operator's knowledge, notes and cautions, and a foldout page. Since observations in this study are comparable to the results of an existing study, it is expected that the operational behaviors observed in this study are generic features of operators who have to cope with a dynamic situation using a static procedure.

  16. Operational limits and conditions and operating procedures for research reactors. Safety guide

    International Nuclear Information System (INIS)

    2008-01-01

    This publication provides practical guidance on all important aspects of developing, formulating and presenting the operational limits and conditions as well as the operating procedures for research reactors. It covers the concept of operational limits and conditions, their content, and the responsibilities of the operating organization with respect to their establishment, modification, documentation and compliance. The guidance also covers the training of operating personnel on performing periodic testing, established by the operational limits and conditions, and operating procedures

  17. Emergency operation procedure navigation to avoid commission errors

    International Nuclear Information System (INIS)

    Gofuku, Akio; Ito, Koji

    2004-01-01

    New types of operation control system equipped with a large screen and CRT-based operation panels have been installed in newly constructed nuclear power plants. The operators can share important information of plant conditions by the large screen. The operation control system can know the operations by operators through the computers connected to the operation panels. The software switches placed in the CRT-based operation panels have a problem such that operators may make an error to manipulate an irrelevant software switch with their current operation. This study develops an operation procedure navigation technique to avoid this kind of commission errors. The system lies between CRT-based operation panels and plant control systems and checks an operation by operators if it follows the operation procedure of operation manuals. When the operation is a right one, the operation is executed as if the operation command is directly transmitted to control systems. If the operation does not follow the operation procedure, the system warns the commission error to operators. This paper describes the operation navigation technique, format of base operation model, and a proto-type operation navigation system for a three loop pressurized water reactor plant. The validity of the proto-type system is demonstrated by the operation procedure navigation for a steam generator tube rupture accident. (author)

  18. Body Mass Index and Operating Times in Vascular Procedures

    Directory of Open Access Journals (Sweden)

    M. Durup-Dickenson

    Full Text Available : Introduction: The influence of body mass index (BMI on operating times in central and peripheral vascular surgical procedures was investigated. Report: A national cohort of Danish patients who underwent a vascular procedure between 1983 and 2012 was used for analysis. Data were analysed with pairwise comparisons of BMI groups for operating times using the independent samples Kruskall–Wallis test. Discussion: A total of 3,255 carotid endarterectomies; 6,885 central vascular procedures; and 4,488 peripheral bypasses were included for the analysis. Median operating times for carotid endarterectomy and central vascular procedures were, respectively, 5 and 15 minutes longer in obese patients than in normal weight patients. This represents a 7% and 10% increase in median operating times, respectively. Linear and multi-adjusted linear regressions were conducted adjusting for confounders, showing a significant correlation between BMI and operating time. Obesity significantly increased the operating times in carotid endarterectomy and central vascular procedures. These may have ramifications for the individual operative stress but not necessarily on logistical operation planning. Keywords: Body mass index (BMI, Obesity, Operating time, Surgery, Vascular surgical procedures

  19. Software functions for safe operation - learning from Sizewell-B

    International Nuclear Information System (INIS)

    Welbourne, D.

    1996-01-01

    Future nuclear plants will use computer-based systems extensively. Regulatory acceptance must be planned and not underestimated. Commercial software packages will simplify it, but costly analysis and demonstration may be needed. Multiplexed control needs preparation of extensive configuration data and careful checking. On-screen soft control will need consideration of the integrity of the control path. Display design should follow human factors analysis of the operators' needs, and display layout needs great care for clarity. Computer-based system with planned quality will then bring great benefits in safe operation. (author) 1 fig., 3 refs

  20. Technical innovations at NPP Dukovany - for safe and efficient operation

    International Nuclear Information System (INIS)

    Sabata, M.; Vasa, I.

    2000-01-01

    Inherent features of the NPP Dukovany design provide a significant confidence in its nuclear safety assurance; among these features should be emphasised the reactor core stability and its control and protection system capability to hold the reactor in safe state following scram or accident conditions. Nevertheless, NPP Dukovany was designed in the early seventies, and current requirements for nuclear safety assurance are more strict and/or specific as a result of the technical development and lessons learned from nuclear accidents. The paper compares the safety design base established at the time of NPP Dukovany project implementation and the current reference design base. The paper also presents procedures applied to implement technical and operational measures which are introduced to fulfil the current basic safety criteria. The scope of such measures applied at NPP Dukovany is compared with that of EU countries introduced for the same reason - to meet the updated safety related requirements. Examples of some innovations already implemented or under implementation give an idea how NPP Dukovany proceeds in reaching the goal of harmonising its safety with the requirements to be met before the Czech Republic becomes a member country of the European Union. (author)

  1. Planetary boundaries: exploring the safe operating space for humanity

    Science.gov (United States)

    Johan Rockström; Will Steffen; Kevin Noone; Asa Persson; F. Stuart Chapin; Eric Lambin; Timothy M. Lenton; Marten Scheffer; Carl Folke; Hans Joachim Schellnhuber; Björn Nykvist; Cynthia A. de Wit; Terry Hughes; Sander van der Leeuw; Henning Rodhe; Sverker Sörlin; Peter K. Snyder; Robert Costanza; Uno Svedin; Malin Falkenmark; Louise Karlberg; Robert W. Corell; Victoria J. Fabry; James Hansen; Brian Walker; Diana Liverman; Katherine Richardson; Paul Crutzen; Jonathan Foley

    2009-01-01

    Anthropogenic pressures on the Earth System have reached a scale where abrupt global environmental change can no longer be excluded. We propose a new approach to global sustainability in which we define planetary boundaries within which we expect that humanity can operate safely. Transgressing one or more planetary boundaries may be deleterious or even catastrophic due...

  2. Psychosocial aspect of safe operation in Japanese nuclear power plants

    International Nuclear Information System (INIS)

    Kuroda, Isao

    1988-01-01

    It is not easy to reveal the reasons of safe operation of N.P.P. because many complicated factors are interrelated. However, to clarify the effective factors of the recent safe operation of Japanese N.P.P. is the important thema of research to continue this condition and the more improved level. At present, the follwing factors can be pointed out; 1) Influential safety policy of regulatory structures. 2) Enthusiastic and careful company policy on N.P.P. safety. 3) Close and stable relationship of the industries with companies on research, training and maintenance. 4) Collaborated safety research among scientific facilities, companies and manufacturers. 5) Good organization and management for N.P.P. personnel. 6) Well organized training program in company and training facilities. 7) Highly motivated N.P.P. personnel with high educational background. 8) Company atmosphere on N.P.P. safety. 9) Public opinion on nuclear power safety. (author)

  3. The Resident-Run Minor Surgery Clinic: A Pilot Study to Safely Increase Operative Autonomy.

    Science.gov (United States)

    Wojcik, Brandon M; Fong, Zhi Ven; Patel, Madhukar S; Chang, David C; Petrusa, Emil; Mullen, John T; Phitayakorn, Roy

    General surgery training has evolved to align with changes in work hour restrictions, supervision regulations, and reimbursement practices. This has culminated in a lack of operative autonomy, leaving residents feeling inadequately prepared to perform surgery independently when beginning fellowship or practice. A resident-run minor surgery clinic increases junior resident autonomy, but its effects on patient outcomes have not been formally established. This pilot study evaluated the safety of implementing a resident-run minor surgery clinic within a university-based general surgery training program. Single institution case-control pilot study of a resident-run minor surgery clinic from 9/2014 to 6/2015. Rotating third-year residents staffed the clinic once weekly. Residents performed operations independently in their own procedure room. A supervising attending surgeon staffed each case prior to residents performing the procedure and viewed the surgical site before wound closure. Postprocedure patient complications and admissions to the hospital because of a complication were analyzed and compared with an attending control cohort. Massachusetts General Hospital General in Boston, MA; an academic tertiary care general surgery residency program. Ten third-year general surgery residents. Overall, 341 patients underwent a total of 399 procedures (110 in the resident clinic vs. 289 in the attending clinic). Minor surgeries included soft tissue mass excision (n = 275), abscess incision and drainage (n = 66), skin lesion excision (n = 37), skin tag removal (n = 15), and lymph node excision (n = 6). There was no significant difference in the overall rate of patients developing a postprocedure complication within 30 days (3.6% resident vs. 2.8% attending; p = 0.65); which persisted on multivariate analysis. Similar findings were observed for the rate of hospital admission resulting from a complication. Resident evaluations overwhelmingly supported the rotation, citing

  4. Radiation exposure of operator during various interventional procedures

    International Nuclear Information System (INIS)

    Yu, In Kyu; Chung, Jin Wook; Han, Joon Koo; Park, Jae Hyung; Kang, Wee Saing

    1994-01-01

    To investigate the levels of radiation exposure of an operator which may be influenced by the wearing an apron, type of procedure, duration of fluoroscopy and operator's skill during various interventional procedures. Radiation doses were measured both inside and outside the apron(0.5 mm lead equivalent) of the operator by a film badge monitoring method and the duration of fluoroscopy was measured in 96 procedures prospectively. The procedures were 30 transcatheter arterial embolization (TAE), 25 percutaneous transhepatic biliary drainages (PTBD), 16 stone removals (SR), 15 percutaneous needle aspirations (PNCA) and 10 percutaneous nephrostomies(PCN). To assess the difference of exposure by the operator's skill, the procedures of TAE and PTBD were done separately by groups of staffs and residents. Average protective effect of the apron was 72.8%. Average radiation exposure(unit: μ Sv/procedure was 23.3 in PTBD by residents, 10.0 in PTBD by staffs, 10.0 in SR, 8.7 in TAE by residents, 7.3 in TAE by staffs, 9.0 in PCN and 6.0 in PCNA. Average radiation exposure of residents were 1.9 times greater than those of staffs. Radiation exposure was not proportionally related to the duration of fluoroscopy, but influenced by wearing an apron, various types of procedure and operator's skills

  5. Computer managed emergency operating procedures

    International Nuclear Information System (INIS)

    Salamun, I.; Mavko, B.; Stritar, A.

    1994-01-01

    New computer technology is a very effective tool for developing a new design of nuclear power plant control room. It allows designer possibility to create a tool for managing with large database of power plant parameters and displaying them in different graphic forms and possibility of automated execution of well known task. The structure of Emergency Operating Procedures (EOP) is very suitable for programming and for creating expert system. The Computerized Emergency Operating Procedures (CEOP) described in this paper can be considered as an upgrading of standard EOP approach. EmDiSY (Emergency Display System - computer code name for CEOP) main purpose is to supply the operator with necessary information, to document all operator actions and to execute well known tasks. It is a function oriented CEOP that gives operator guidance on how to verify the critical safety functions and how to restore and maintain these functions where they are degraded. All knowledge is coded and stored in database files. The knowledge base consists from stepping order for verifying plant parameters, desired values of parameters, conditions for comparison and links between procedures and actions. Graphical shell allows users to read database, to follow instruction and to find out correct task. The desired information is concentrated in one screen and allows users to focus on a task. User is supported in two ways: desired parameter values are displayed on the process picture and automated monitoring critical safety function status trees are all time in progress and available to the user. (author). 4 refs, 4 figs

  6. Operating manual for the critical experiments facility

    International Nuclear Information System (INIS)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written

  7. Operating manual for the critical experiments facility

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written.

  8. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  9. Surgical resident involvement is safe for common elective general surgery procedures.

    Science.gov (United States)

    Tseng, Warren H; Jin, Leah; Canter, Robert J; Martinez, Steve R; Khatri, Vijay P; Gauvin, Jeffrey; Bold, Richard J; Wisner, David; Taylor, Sandra; Chen, Steven L

    2011-07-01

    Outcomes of surgical resident training are under scrutiny with the changing milieu of surgical education. Few have investigated the effect of surgical resident involvement (SRI) on operative parameters. Examining 7 common general surgery procedures, we evaluated the effect of SRI on perioperative morbidity and mortality and operative time (OpT). The American College of Surgeons National Surgical Quality Improvement Program database (2005 to 2007) was used to identify 7 cases of nonemergent operations. Cases with simultaneous procedures were excluded. Logistic regression was performed across all procedures and within each procedure incorporating SRI, OpT, and risk-stratifying American College of Surgery National Surgical Quality Improvement Program morbidity and mortality probability scores, which incorporate multiple prognostic individual patient factors. Procedure-specific, SRI-stratified OpTs were compared using Wilcoxon rank-sum tests. A total of 71.3% of the 37,907 cases had SRI. Absolute 30-day morbidity for all cases with SRI and without SRI were 3.0% and 1.0%, respectively (p < 0.001); absolute 30-day mortality for all cases with SRI and without SRI were 0.1% and 0.08%, respectively (p < 0.001). After multivariate analysis by specific procedure, SRI was not associated with increased morbidity but was associated with decreased mortality during open right colectomy (odds ratio 0.32; p = 0.01). Across all procedures, SRI was associated with increased morbidity (odds ratio 1.14; p = 0.048) but decreased mortality (odds ratio 0.42; p < 0.001). Mean OpT for all procedures was consistently lower for cases without SRI. SRI has a measurable impact on both 30-day morbidity and mortality and OpT. These data have implications to the impact associated with surgical graduate medical education. Further studies to identify causes of patient morbidity and prevention strategies in surgical teaching environments are warranted. Copyright © 2011 American College of Surgeons

  10. FFTF operations procedures preparation guide. Revision 2

    International Nuclear Information System (INIS)

    1976-12-01

    The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3

  11. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  12. A standardized and safe method of sterile field maintenance during intra-operative horizontal plane fluoroscopy

    Directory of Open Access Journals (Sweden)

    Kaska Serge C

    2010-12-01

    Full Text Available Abstract Background Intra-operative fluoroscopy for orthopaedic procedures frequently involves imaging in the horizontal plane, which requires the lower portion of the C-arm (x-ray tube to be rotated from an unsterile zone (beneath the table into the sterile field. To protect the integrity of the sterile field the C-arm must be draped repeatedly throughout the surgical case. The current, un-standardized, practice employs draping procedures which violate the Association of peri-Operative Registered Nurses (AORN Standards and Recommended Practices, waste time and material, and pose an increased risk for surgical site infection. Presentation of the hypothesis Use of a novel sterile C-arm drape (C-armor that maintains the integrity of the sterile field, will improve operating room efficiency and reduce surgical site infection risk factors. This reduction in risk factors may potentially reduce surgical site infections in orthopaedic surgical cases requiring repeated horizontal x-ray imaging. Testing the Hypothesis Savings in time and material and the reduction in surgical site infection risk factors afforded by using C-armor are intuitive to those skilled in the practice of orthopaedic surgery. Testing for a reduction in the number of microorganisms introduced to the surgical site by improved C-arm draping would be challenging due to the multiple confounding factors during a surgical operation. Determination of an absolute reduction in surgical site infections may be possible, but will require accounting for many confounding variables and a large study sample in order to achieve statistical significance. Implications of the Hypothesis Improved intraoperative workflow, healthcare savings and a reduction in surgical site infection risk factors will be achieved by utilizing a standardized and safe method of sterile field maintenance during intra-operative horizontal plane fluoroscopy.

  13. Operating procedure automation to enhance safety of nuclear power plants

    International Nuclear Information System (INIS)

    Husseiny, A.A.; Sabri, Z.A.; Adams, S.K.; Rodriguez, R.J.; Packer, D.; Holmes, J.W.

    1989-01-01

    Use of logic statements and computer assist are explored as means for automation and improvement on design of operating procedures including those employed in abnormal and emergency situations. Operating procedures for downpower and loss of forced circulation are used for demonstration. Human-factors analysis is performed on generic emergency operating procedures for three strategies of control; manual, semi-automatic and automatic, using standard emergency operating procedures. Such preliminary analysis shows that automation of procedures is feasible provided that fault-tolerant software and hardware become available for design of the controllers. Recommendations are provided for tests to substantiate the promise of enhancement of plant safety. Adequate design of operating procedures through automation may alleviate several major operational problems of nuclear power plants. Also, automation of procedures is necessary for partial or overall automatic control of plants. Fully automatic operations are needed for space applications while supervised automation of land-based and offshore plants may become the thrust of new generation of nulcear power plants. (orig.)

  14. Radiation dose to the operator during fluoroscopically guided spine procedures

    Energy Technology Data Exchange (ETDEWEB)

    Roccatagliata, Luca; Pravata, Emanuele; Cianfoni, Alessandro [Department of Neuroradiology, Neurocenter of Southern Switzerland, Ospedale Regionale di Lugano, Lugano (Switzerland); Presilla, Stefano [Unita di Fisica Medica, Ente Ospedaliero Cantonale (EOC), Bellinzona (Switzerland)

    2017-09-15

    Fluoroscopy is widely used to guide diagnostic and therapeutic spine procedures. The purpose of this study was to quantify radiation incident on the operator (operator Air Kerma) during a wide range of fluoroscopy-guided spine procedures and its correlation with the amount of radiation incident on the patient (Kerma Area Product - KAP). We retrospectively included 57 consecutive fluoroscopically guided spine procedures. KAP [Gy cm{sup 2}] and total fluoroscopy time were recorded for each procedure. An electronic dosimeter recorded the operator Air Kerma [μGy] for each procedure. Operator Air Kerma for each procedure, correlation between KAP and operator Air Kerma, and between KAP and fluoroscopy time was obtained. Operator Air Kerma was widely variable across procedures, with median value of 6.4 μGy per procedure. Median fluoroscopy time and median KAP per procedure were 2.6 min and 4.7 Gy cm{sup 2}, respectively. There was correlation between operator Air Kerma and KAP (r{sup 2} = 0.60), with a slope of 1.6 μGy Air Kerma per unit Gy cm{sup 2} KAP incident on the patient and between fluoroscopy time and KAP (r{sup 2} = 0.63). Operator Air Kerma during individual fluoroscopy-guided spine procedures can be approximated from the commonly and readily available information of the total amount of radiation incident on the patient, measured as KAP. (orig.)

  15. Recommended Practices for the Safe Design and Operation of Flywheels

    Energy Technology Data Exchange (ETDEWEB)

    Bender, Donald Arthur [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-01

    Flywheel energy storage systems are in use globally in increasing numbers . No codes pertaining specifically to flywheel energy storage exist. A number of industrial incidents have occurred. This protocol recommends a technical basis for safe flywheel de sign and operation for consideration by flywheel developers, users of flywheel systems and standards setting organizations.

  16. LHC collimator controls for a safe LHC operation

    International Nuclear Information System (INIS)

    Redaelli, S.; Assmann, R.; Losito, R.; Donze, M.; Masi, A.

    2012-01-01

    The Large Hadron Collider (LHC) collimation system is designed to protect the machine against beam losses and consists of 108 collimators, 100 of which are movable, located along the 27 km long ring and in the transfer lines. The cleaning performance and machine protection role of the system depend critically on accurate jaw positioning. A fully redundant control system has been developed to ensure that the collimators dynamically follow optimum settings in all phases of the LHC operational cycle. Jaw positions and collimator gaps are interlocked against dump limits defined redundantly as functions of time, beam energy and the β functions, which describe the focusing property of the beams. In this paper, the architectural choices that guarantee a safe LHC operation are presented. Hardware and software implementations that ensure the required performance are described. (authors)

  17. Development of symptoms-oriented operating procedures

    International Nuclear Information System (INIS)

    Colquhoun, R.

    1984-01-01

    Until recently, the formal treatment of control room procedures for upset conditions in nuclear power plants has been event-oriented. This orientation was not so much a reflection of power plant operating practice as it was a reflection of design-oriented thinking - design-basis events, therefore event-oriented procedures. Event orientation is not common in other professions. In the medical profession, for example, the stabilization of vital functions through a symptoms-oriented approach has priority over diagnosis and prognosis. The American nuclear power industry has initiated programs for the development and application of a symptoms-oriented approach for handling upset conditions. Canadian programs have independently paralleled the US programs. This article describes the rationale and current applications of the Canadian programs and identifies the relevance of a generic symptoms-based emergency procedure to current operating practices

  18. Operator use of procedures during simulated emergencies

    International Nuclear Information System (INIS)

    Roth, E.M.; Mumaw, R.J.; Lewis, P.M.

    1995-01-01

    This paper summarizes the results of an empirical study of nuclear power plant operator performance in cognitively demanding simulated emergencies. During emergencies operators follow highly prescriptive written procedures. The objectives of the study were to understand and document what role higher-level cognitive activities such as diagnosis, or more generally ' situation assessment,' play in guiding operator performance, given that operators utilize procedures in responding to the events. The study examined crew performance in variants of two simulated emergencies: (1) an Interfacing System Loss of Coolant Accident and (2) a Loss of Heat Sink scenario. Data on operator performance were collected using training simulators at two plant sites. Up to 11 crews from each plant participated in each of two simulated emergencies for a total of 38 cases analyzed. Crew performance was videotaped and partial transcripts were produced and analyzed. The results revealed a number of instances where higher-level cognitive activities such as situation assessment and response planning enabled operators to handle aspects of the situation that were not fully addressed by the procedures. The paper summarizes these cases and their implications for the development and evaluation of training and control room aids, as well as for human reliability analyses. The full report of the study is published as NUREG/CR-6208

  19. Unmanned Aerial Systems Traffic Management (UTM): Safely Enabling UAS Operations in Low-Altitude Airspace

    Science.gov (United States)

    Jung, Jaewoo; Kopardekar, Parimal H.

    2016-01-01

    Flexibility where possible, and structure where necessary. Consider the needs of national security, safe airspace operations, economic opportunities, and emerging technologies. Risk-based approach based on population density, assets on the ground, density of operations, etc. Digital, virtual, dynamic, and as needed UTM services to manage operations.

  20. Blue limits of the Blue Planet : An exploratory analysis of safe operating spaces for human water use under deep uncertainty

    NARCIS (Netherlands)

    Kwakkel, J.H.; Timmermans, J.S.

    2012-01-01

    In the Nature article ‘A safe operating space for humanity’, Rockström et al. (2009) introduce the concept of a safe operating space for humanity. A safe operating space is the space for human activities that will not push the planet out of the ‘Holocene state’ that has seen human civilizations

  1. Safe introduction of new procedures and emerging technologies in surgery: education, credentialing, and privileging.

    Science.gov (United States)

    Sachdeva, Ajit K; Russell, Thomas R

    2007-08-01

    Ongoing horizon scanning is needed to identify new procedures and emerging technologies that should be evaluated for introduction into surgical practice. Following evidence-based evaluation, if a new modality is found ready for adoption in practice, surgeons need education in the safe and effective use of the new modality. The educational experience should include structured teaching and learning, verification of new knowledge and skills, preceptoring or proctoring, and monitoring of outcomes. Credentialing and privileging to perform a new procedure or use an emerging technology should be based on evaluation of knowledge and skills and outcomes of surgical care, and not merely on the numbers of procedures performed. Education of the surgical team is also essential. The entire process involving education, verification of knowledge and skills, credentialing, and privileging must be transparent. Patients need to play a central role in making informed decisions regarding their care that involves use of a new procedure or an emerging technology, and they should participate actively in their perioperative care.

  2. 49 CFR 398.5 - Parts and accessories necessary for safe operation.

    Science.gov (United States)

    2010-10-01

    ... REGULATIONS TRANSPORTATION OF MIGRANT WORKERS § 398.5 Parts and accessories necessary for safe operation. (a... not be of welded construction. The installation shall be such as not to cause cracking, warping, or... high, by attachment of sideboards to the permanent body construction if necessary. Stake body...

  3. Microbial ecology laboratory procedures manual NASA/MSFC

    Science.gov (United States)

    Huff, Timothy L.

    1990-01-01

    An essential part of the efficient operation of any microbiology laboratory involved in sample analysis is a standard procedures manual. The purpose of this manual is to provide concise and well defined instructions on routine technical procedures involving sample analysis and methods for monitoring and maintaining quality control within the laboratory. Of equal importance is the safe operation of the laboratory. This manual outlines detailed procedures to be followed in the microbial ecology laboratory to assure safety, analytical control, and validity of results.

  4. Operator use of procedures during simulated emergencies

    Energy Technology Data Exchange (ETDEWEB)

    Roth, E.M.; Mumaw, R.J.; Lewis, P.M.

    1995-04-01

    This paper summarizes the results of an empirical study of nuclear power plant operator performance in cognitively demanding simulated emergencies. During emergencies operators follow highly prescriptive written procedures. The objectives of the study were to understand and document what role higher-level cognitive activities such as diagnosis, or more generally {open_quotes}situation assessment,{close_quotes} play in guiding operator performance, given that operators utilize procedures in responding to the events. The study examined crew performance in variants of two simulated emergencies: (1) an Interfacing System Loss of Coolant Accident and (2) a Loss of Heat Sink scenario. Data on operator performance were collected using training simulators at two plant sites. Up to 11 crews from each plant participated in each of two simulated emergencies for a total of 38 cases analyzed. Crew performance was videotaped and partial transcripts were produced and analyzed. The results revealed a number of instances where higher-level cognitive activities such as situation assessment and response planning enabled operators to handle aspects of the situation that were not fully addressed by the procedures. The paper summarizes these cases and their implications for the development and evaluation of training and control room aids, as well as for human reliability analyses. The full report of the study is published as NUREG/CR-6208.

  5. Water hydraulic manipulator for fail safe and fault tolerant remote handling operations at ITER

    International Nuclear Information System (INIS)

    Nieminen, Peetu; Esque, Salvador; Muhammad, Ali; Mattila, Jouni; Vaeyrynen, Jukka; Siuko, Mikko; Vilenius, Matti

    2009-01-01

    Department of Intelligent Hydraulics and Automation (IHA) of Tampere University of Technology has been involved in the European Fusion program since 1994 within the ITER reactor maintenance activities. In this paper we discuss the design and development of a six degrees of freedom water hydraulic manipulator with a force feedback for teleoperation tasks. The manipulator is planned to be delivered to Divertor Test Platform 2 (DTP2) during year 2008. The paper also discusses the possibility to improve the fail safe and redundant operation of the manipulator. During the design of the water hydraulic manipulator, special provisions have been made in order to meet the safety requirements such as servo valve block for redundant operation and safety vane brakes for fail safe operation.

  6. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This document details procedures for the operation of the MITS (Machine Interface Test System) Feed and Withdrawal Subsystem (F and W). Included are fill with UF 6 , establishment of recycle and thruput flows, shutdown, UF 6 makeup, dump to supply container, Cascade dump to F and W, and lights cold trap dump, all normal procedures, plus an alternate procedure for trapping light gases

  7. Improved Design of Crew Operation in Computerized Procedure System of APR1400

    Energy Technology Data Exchange (ETDEWEB)

    Seong, No Kyu; Jung, Yeon Sub; Sung, Chan Ho [KHNP, Daejeon (Korea, Republic of)

    2016-05-15

    The operators perform the paper-based procedures in analog-based conventional main control room (MCR) depending on only communications between operators except a procedure controller such as a Shift Supervisor (SS), however in digital-based MCR the operators can confirm the procedures simultaneously in own console when the procedure controller of computerized procedure (CP) opens the CP. The synchronization and a synchronization function between procedure controller and other operators has to be considered to support the function of crew operation. This paper suggests the improved design of crew operation in computerized procedure system of APR1400. This paper suggests the improved design of APR1400 CPS. These improvements can help operators perform the crew procedures more efficiently. And they reduce a burden of communication and misunderstanding of computerized procedures. These improvements can be applied to CPS after human factors engineering verification and validation.

  8. Magnetic fusion energy. Disaster operation procedures

    International Nuclear Information System (INIS)

    1986-06-01

    In a major disaster such as an earthquake, toxic chemical release, or fire, these Disaster Operations Procedures can be used, in combination with good judgment, to minimize the risk of injury to personnel and of property damage in our laboratory, shop, and office areas. These emergency procedures apply to all personnel working within MFE/Zone-11 area including visitors, program contract personnel, and construction contract personnel

  9. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  10. The operational procedure of an electron beam accelerator

    International Nuclear Information System (INIS)

    Lee, Byung Cheol; Choi, Hwa Lim; Yang, Ki Ho; Han, Young Hwan; Kim, Sung Chan

    2008-12-01

    The KAERI(Korea Atomic Energy of Research Institute) high-power electron beam irradiation facility, operating at the energies between 0.3 MeV and 10 MeV, has provided irradiation services to users in industries, universities, and institute in various fields. This manual is for the operation of an electron beam which is established in KAERI, and describes elementary operation procedures of electron beam between 0.3 Mev and 10 MeV. KAERI Electron Accelerator facility(Daejeon, Korea) consists of two irradiators: one is a low-energy electron beam irradiator operated by normal conducting RF accelerator, the other is medium-energy irradiator operated by superconducting RF accelerator. We explain the check points of prior to operation, operation procedure of this facility and the essential parts of electron beam accelerator

  11. The operational procedure of an electron beam accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Cheol; Choi, Hwa Lim; Yang, Ki Ho; Han, Young Hwan; Kim, Sung Chan

    2008-12-15

    The KAERI(Korea Atomic Energy of Research Institute) high-power electron beam irradiation facility, operating at the energies between 0.3 MeV and 10 MeV, has provided irradiation services to users in industries, universities, and institute in various fields. This manual is for the operation of an electron beam which is established in KAERI, and describes elementary operation procedures of electron beam between 0.3 Mev and 10 MeV. KAERI Electron Accelerator facility(Daejeon, Korea) consists of two irradiators: one is a low-energy electron beam irradiator operated by normal conducting RF accelerator, the other is medium-energy irradiator operated by superconducting RF accelerator. We explain the check points of prior to operation, operation procedure of this facility and the essential parts of electron beam accelerator.

  12. Advanced laparoscopic bariatric surgery Is safe in general surgery training.

    Science.gov (United States)

    Kuckelman, John; Bingham, Jason; Barron, Morgan; Lallemand, Michael; Martin, Matthew; Sohn, Vance

    2017-05-01

    Bariatric surgery makes up an increasing percentage of general surgery training. The safety of resident involvement in these complex cases has been questioned. We evaluated patient outcomes in resident performed laparoscopic bariatric procedures. Retrospective review of patients undergoing a laparoscopic bariatric procedure over seven years at a tertiary care single center. Procedures were primarily performed by a general surgery resident and proctored by an attending surgeon. Primary outcomes included operative volume, operative time and leak rate with perioperative outcomes evaluated as secondary outcomes. A total of 1649 bariatric procedures were evaluated. Operations included laparoscopic bypass (690) and laparoscopic sleeve gastrectomy (959). Average operating time was 136 min. Eighteen leaks (0.67%) were identified. Graduating residents performed an average of 89 laparoscopic bariatric cases during their training. There were no significant differences between resident levels with concern to operative time or leak rate (p 0.97 and p = 0.54). General surgery residents can safely perform laparoscopic bariatric surgery. When proctored by a staff surgeon, a resident's level of training does not significantly impact leak rate. Published by Elsevier Inc.

  13. Study of operating procedures in nuclear power plants: Practices and problems

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; McGuire, M.V.; Radford, L.R.; Wheeler, W.A.

    1987-02-01

    This report describes the project activities, findings, and recommendations of a project entitled ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants.'' The project was performed by the Pacific Northwest Laboratory and Battelle Human Affairs Research Centers for the Division of Human Factors Technology, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (NRC). The project team analyzed and evaluated samples of normal and abnormal operating procedures from 31 commercial nuclear power plant sites operating in the United States. The project team also visited nine nuclear power plants in the United States to obtain information on the development, use, and control of operating procedures. A peer review group was convened to advise the project team on the conduct of the project and to review and comment on the project report. The report contains findings on the usability of operating procedures and on practices concerning the development, use, an control of operating procedures in nuclear power plants. The report includes recommendations to the NRC on the need to upgrade the quality of operating procedures. The report also discusses an approach to a program plan to assess and upgrade operating procedures

  14. Instructional maps of safe working methods and practices for separate types of opera-tions conducted in the oil mine

    Directory of Open Access Journals (Sweden)

    И. В. Климова

    2017-06-01

    Full Text Available Instructing personnel in the issues of labor protection and industrial safety at hazardous facilities is one of the main tasks that face the employer; the quality with which this procedure is organized and carried out defines not only company’s indicators, but the mere possibility of its normal functioning. The paper contains a detailed overview of the typical content of standard documentation, which is currently used when conducting operations in the oil mines of Yarega high-viscosity oil deposit. Distinct features and unique nature of this oil field require special measures to guarantee safety of personnel and all facilities in general.The author proposes and reviews an additional type of operating guidelines – instructional map of safe working methods and practices. It is more illustrative than existing documentation (charts of inclined shaft development, labor protection regulations, which allows to upgrade the process of instructing personnel in the oil mines, to improve the quality of instructions and to reduce the risk of emergencies, accidents, industrial injuries.The author reviews the structure of suggested instructional map, offers a detailed arrangement diagram for the main thematic sections of the map, as well as their content. Instructional maps are regarded as a type of operating guidelines that include: description and characteristics of equipment, instruments and appliances; general safety requirements; content and execution sequence of operational elements with their graphical images; distribution of responsibilities with an indication of their priority in case the operations are conducted by several workers; specific safety requirements for equipment, materials, instruments, safety clothes and footwear, personal protective gear etc. (prohibitions, warnings.Advantages and disadvantages of proposed instructional maps of safe working methods and practices are highlighted.

  15. Safe and efficient operation of multistage cold compressor systems

    International Nuclear Information System (INIS)

    Kauschke, M.; Haberstroh, C.; Quack, H.

    1996-01-01

    Large refrigeration rates in the temperature range of super fluid helium can only be obtained with the help of centrifugal cold compressors. For the large 2 K systems, four compression stages are necessary to reach atmospheric pressure. Centrifugal cold compressors are quite sensitive to mass flow and suction temperature variations; but these have to be expected in a real system. The first step in the systems design is to find safe and efficient quasi-stationary modes of operation. The system which is being proposed for the TESLA refrigerators relies on two features. The first is to allow the room temperature screw compressor, downstream of the cold compressors to work occasionally with a subatmospheric suction pressure. The second is to stabilize the suction temperature of the third stage of compression at about 10 K. With these features it is possible, that in all modes of operation all four compressor stages operate exactly at their design point

  16. Fail-safe computer-based plant protection systems

    International Nuclear Information System (INIS)

    Keats, A.B.

    1983-01-01

    A fail-safe mode of operation for computers used in nuclear reactor protection systems was first evolved in the UK for application to a sodium cooled fast reactor. The fail-safe properties of both the hardware and the software were achieved by permanently connecting test signals to some of the multiplexed inputs. This results in an unambiguous data pattern, each time the inputs are sequentially scanned by the multiplexer. The ''test inputs'' simulate transient excursions beyond defined safe limits. The alternating response of the trip algorithms to the ''out-of-limits'' test signals and the normal plant measurements is recognised by hardwired pattern recognition logic external to the computer system. For more general application to plant protection systems, a ''Test Signal Generator'' (TSG) is used to compute and generate test signals derived from prevailing operational conditions. The TSG, from its knowledge of the sensitivity of the trip algorithm to each of the input variables, generates a ''test disturbance'' which is superimposed upon each variable in turn, to simulate a transient excursion beyond the safe limits. The ''tripped'' status yielded by the trip algorithm when using data from a ''disturbed'' input forms part of a pattern determined by the order in which the disturbances are applied to the multiplexer inputs. The data pattern formed by the interleaved test disturbances is again recognised by logic external to the protection system's computers. This fail-safe mode of operation of computer-based protection systems provides a powerful defence against common-mode failure. It also reduces the importance of software verification in the licensing procedure. (author)

  17. Coping with Unanticipated Accidents using Emergency Operating Procedures

    International Nuclear Information System (INIS)

    Kim, Yochan; Jung, Wondea

    2013-01-01

    In, unsafe acts associated with a literal following of a procedure were reported. A report of the Fukushima accident also revealed that a tendency to adhere to procedures and prior practices can impede applying effective countermeasures. To overcome the conflicts between benefit and jeopardy of procedures during unanticipated accidents, we reviewed the literature on the perspectives of cognitive engineering and artificial intelligence. From the insights about human planning of the literatures, we also proposed an approach of how to train operators to effectively use EOPs during unanticipated accidents. There are three key processes required to effectively cope with emergency situations: how correctly the operators are aware of the occurring situations, how properly they develop corresponding plans for the situations, and how accurately they execute the plans. This paper presents a way to develop the plans using EOPs from some literature of human planning. Even if professional operators have implicitly shaped good structures of procedures already, it is expected that this approach will provide a more systematic and concrete training strategy. If the operators are trained with this strategy, a higher level of human reliability would be ensured in unanticipated accidents

  18. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This procedure details the steps required to provide continuous feed flow and withdrawal of process product and waste flows in support of thruput operation in the cascade or its elements. It particularly requires operator attention to safety considerations

  19. Automated emergency operating procedures

    International Nuclear Information System (INIS)

    Perez-Ramirez, G.; Nelson, P.F.

    1990-01-01

    This paper describes the development of a training tool for the symptom oriented emergency operating procedures used at the Laguna Verde Nuclear Power Plant. EOPs and operator training are intended to assist the operator for managing accident situations. A prototype expert system based on the EOPs has been developed for operator training. The demonstration expert system was developed using a commercial shell. The knowledge base consists of two parts. The specific operator actions to be executed for 5 selected accident sequences and the EOPs steps for the reactor pressure vessel control of the water level, pressure, and power. The knowledge is expressed in the form of IF-THEN production rules. A typical training session will display a set of conditions and will prompt the trainee to indicate the appropriate step to perform. This mode will guide the trainee through selected accident sequences. A second mode of the expert system will prompt the trainee for the current plant conditions and the expert system will respond with the EOPs which are required to be performed under these conditions. This allows the trainee to study What if situations

  20. Gas Bearing Control for Safe Operation in Critical Speed Regions - Experimental Verification

    DEFF Research Database (Denmark)

    Theisen, Lukas R. S.; Niemann, Hans H.; Galeazzi, Roberto

    2015-01-01

    supported by gas bearings to extend their operating range. Using H∞-design methods, active lubrication techniques are proposed to enhance the damping, which in turn reduces the vibrations to a desired safe level. The control design is validated experimentally on a laboratory test rig, and shown to allow...... and deceleration patterns and avoidance of operation near the critical speeds, which is a limiting factor during operation, specially during run-downs. An approach for reducing the vibrations is by feedback controlled lubrication. This paper addresses the challenge of reducing vibrations in rotating machines...

  1. The procedure execution manager and its application to Advanced Photon Source operation

    International Nuclear Information System (INIS)

    Borland, M.

    1997-01-01

    The Procedure Execution Manager (PEM) combines a complete scripting environment for coding accelerator operation procedures with a manager application for executing and monitoring the procedures. PEM is based on Tcl/Tk, a supporting widget library, and the dp-tcl extension for distributed processing. The scripting environment provides support for distributed, parallel execution of procedures along with join and abort operations. Nesting of procedures is supported, permitting the same code to run as a top-level procedure under operator control or as a subroutine under control of another procedure. The manager application allows an operator to execute one or more procedures in automatic, semi-automatic, or manual modes. It also provides a standard way for operators to interact with procedures. A number of successful applications of PEM to accelerator operations have been made to date. These include start-up, shutdown, and other control of the positron accumulator ring (PAR), low-energy transport (LET) lines, and the booster rf systems. The PAR/LET procedures make nested use of PEM's ability to run parallel procedures. There are also a number of procedures to guide and assist tune-up operations, to make accelerator physics measurements, and to diagnose equipment. Because of the success of the existing procedures, expanded use of PEM is planned

  2. Organisational factors important to the safe operation of NPPs

    International Nuclear Information System (INIS)

    Frischknecht, Albert; Baumont, Genevieve

    2000-01-01

    The purpose of this paper is to present the achievements of a group of human factor specialists known as Expanded Task Force on Human Factors (ETF). ETF is part of the Principal Working Group No.1 (PWG1) on 'Operating Experience and Human Factors' of the Committee on Nuclear Safety Installations (CSNI) of the OECD Nuclear Energy Agency (NEA). Today, as shown by incident analysis, technology is so far developed that human behaviour and organisational deficiencies can contribute to a major part of the root causes of incidents in nuclear power plants. The influence of the organisation on the safe behaviour and performance of individuals is recognised as a relevant issue for the safety of nuclear power plants (NPPs). The need for an up-to-date basis of knowledge in this area was recognised by CSNI and therefore the ETF organised a workshop, in Switzerland, in 1998, on Organisational Factors. During the workshop, different aspects of organisational influences on the safe operation of NPPs were discussed and twelve important organisational factors concerning safety related activities in a NPP were identified. The result of the workshop is summarised in a state-of-the-art Report (SOAR) 'Identification and Assessment of Organisational Factors Related to the Safety of NPPs' issued by the OECD/NEA. The present paper gives an overview on the main findings of the workshop and conclusions concerning the evaluation of organisational factors. (author)

  3. 40 CFR 160.81 - Standard operating procedures.

    Science.gov (United States)

    2010-07-01

    .... (10) Data handling, storage and retrieval. (11) Maintenance and calibration of equipment. (12... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures... test, control, and reference substances. (4) Test system observations. (5) Laboratory or other tests...

  4. Procedures and practices for day-to-day operation

    International Nuclear Information System (INIS)

    Distler, K.

    1986-01-01

    This lecture deals with problems of safe plant operation under day-to-day conditions. Operation, maintenance and surveillance have to be organized in a preventive manner. It will be shown that nearly all expected jobs and proceedings can be done rule-based. The connection of documentation and work preparation will be lined out. Moreover, the need for control and quality assurance for nearly all proceedings will be pointed out. The question of communication and scheduling will be touched. (orig.)

  5. Safeguards Automated Facility Evaluation (SAFE) methodology

    International Nuclear Information System (INIS)

    Chapman, L.D.; Grady, L.M.; Bennett, H.A.; Sasser, D.W.; Engi, D.

    1978-08-01

    An automated approach to facility safeguards effectiveness evaluation has been developed. This automated process, called Safeguards Automated Facility Evaluation (SAFE), consists of a collection of a continuous stream of operational modules for facility characterization, the selection of critical paths, and the evaluation of safeguards effectiveness along these paths. The technique has been implemented on an interactive computer time-sharing system and makes use of computer graphics for the processing and presentation of information. Using this technique, a comprehensive evaluation of a safeguards system can be provided by systematically varying the parameters that characterize the physical protection components of a facility to reflect the perceived adversary attributes and strategy, environmental conditions, and site operational conditions. The SAFE procedure has broad applications in the nuclear facility safeguards field as well as in the security field in general. Any fixed facility containing valuable materials or components to be protected from theft or sabotage could be analyzed using this same automated evaluation technique

  6. RTOD-photo operations and procedures manual

    Energy Technology Data Exchange (ETDEWEB)

    1966-03-15

    This document presents a survey of the EG&G NRDS photographic operation in four major sections and includes the work scope, procedures, some technical backgrounding and operational information. Two sections, Instrumentation and Photo Systems, include the areas of direct responsibilities while a section on Film Handling and Coordination and a section covering special information, pertinent to the project, are included to adequately complete this survey. The photographic group is housed in two trailers within the control point area at NRDS and from these trailers provides photographic support at a number of locations. Four camera bunkers, three camera towers, a kinescope system, a microfilm system and remote camera controls comprise the facilities that the group maintains and operates outside these trailers. The work load includes major items such as: motion picture coverage of the nuclear rocket engine tests, data record microfilming, kinescope recording, and documentary coverage of the company related operational responsibilities. In addition, a number of minor photographic services are extended, when required. The nature of the work, because of its importance within the research and development efforts at NRDS, requires optimum quality and efficiency throughout. The many procedures outlined here have been designed to satisfy these requirements.

  7. Philosophy, policies, and procedures - The three P's of flight-deck operations

    Science.gov (United States)

    Degani, Asaf; Wiener, Earl L.

    1991-01-01

    Standard operating procedures are drafted and provided to flightcrews to dictate the manner in which tasks are carried out. Failure to conform to Standard Operating Procedures (SOP) is frequently listed as the cause of violations, incidents, and accidents. However, procedures are often designed piecemeal, rather than being based on a sound philosophy of operations and policies that follow from such a philosophy. A framework of philosophy, policies, and procedures is proposed.

  8. Safe design and operation of fluidized-bed reactors: Choice between reactor models

    NARCIS (Netherlands)

    Westerink, E.J.; Westerterp, K.R.

    1990-01-01

    For three different catalytic fluidized bed reactor models, two models presented by Werther and a model presented by van Deemter, the region of safe and unique operation for a chosen reaction system was investigated. Three reaction systems were used: the oxidation of benzene to maleic anhydride, the

  9. Surgical site infections in paediatric otolaryngology operative procedures.

    Science.gov (United States)

    Ifeacho, S N; Bajaj, Y; Jephson, C G; Albert, D M

    2012-07-01

    An assessment of the rate of surgical site infections associated with elective paediatric otolaryngology surgical procedures. Prospective data was collected for a 3-week period for all children undergoing surgery where either mucosa or skin was breached. The parents of the children were requested to complete a questionnaire at 30 days after the operation. Data was collected on 80 consecutive cases. The majority of cases were admitted on the day of the procedure. The procedures included adenotonsillectomy (24), grommets (12), cochlear implantation (6), bone-anchored hearing aid (2), submandibular gland excision (1), branchial sinus excision (1), cystic hygroma excision (3), nasal glioma excision (1), microlaryngobronchoscopy (13), tracheostomy (3) and other procedures (14). Nearly half the cases had more than one operation done at the same time. 26/80 (32.5%) patients had a temporary or permanent implant inserted at the time of operation (grommet, bone-anchored hearing aid, cochlear implant). 25/80 (31%) operative fields were classed as clean and 55/80 (68.7%) as clean contaminated operations. The duration of the operation varied from 6 min to 142 min. Hospital antibiotic protocol was adhered to in 69/80 (86.3%) cases but not in 11/80 cases. In our series, 3/80 (3.7%) patients had an infection in the postoperative period. Surgical site infections do occur at an appreciable rate in paediatric otolaryngology. With the potential for serious consequences, reduction in the risk of surgical site infections is important. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  10. Deep geological repositories. Safe operation and long-term safety in the prism of reversibility

    Energy Technology Data Exchange (ETDEWEB)

    Espivent, Camille; Tichauer, Michael [IRSN, Fontenay-aux-Roses (France)

    2015-07-01

    A deep geological repository is the reference solution enshrined in the French law for the long-term management of high-level radioactive waste. The current project is led by Andra, the French radioactive waste management organization. As a technical support organization, IRSN's mission is, on the basis of the safety case produced by Andra, to assess the safety of such a facility at its various stages of development, that is to say the design, construction, operation and post-closure phases of the facility. Such a facility will have to meet specific requirements, within different time frames as stated above. One of the requirements is ''reversibility'': in fact, French law poses that the geological disposal will have to be ''reversible'' for a certain time, yet not fully defined. Reversibility is nevertheless believed encompassing both the decision making process related to the waste emplacement process during operational phase and the ability to retrieve waste, should such a decision be made. Thus, underground structures have to be designed and operated to allow both waste emplacement and removal. Moreover, future decision making about the disposal process will have to rely on a sound technical basis. This implies a data collection scheme and a monitoring program of the facility to check if the disposal process is bound by limits, controls and conditions compatible with (i) a safe operation of the facility and (ii) the state of the facility that the operator wants to achieve at the time of its closure, so that long-term safety is guaranteed. Therefore, technical criteria and key parameters have to be selected and monitored during construction and operation, that is to say for decades. Then, reversibility have to make room for corrective actions, including the retrieval of waste, if something goes wrong and especially if the facility is not seen as safe anymore, especially in the perspective of long-term safety. To

  11. Deep geological repositories. Safe operation and long-term safety in the prism of reversibility

    International Nuclear Information System (INIS)

    Espivent, Camille; Tichauer, Michael

    2015-01-01

    A deep geological repository is the reference solution enshrined in the French law for the long-term management of high-level radioactive waste. The current project is led by Andra, the French radioactive waste management organization. As a technical support organization, IRSN's mission is, on the basis of the safety case produced by Andra, to assess the safety of such a facility at its various stages of development, that is to say the design, construction, operation and post-closure phases of the facility. Such a facility will have to meet specific requirements, within different time frames as stated above. One of the requirements is ''reversibility'': in fact, French law poses that the geological disposal will have to be ''reversible'' for a certain time, yet not fully defined. Reversibility is nevertheless believed encompassing both the decision making process related to the waste emplacement process during operational phase and the ability to retrieve waste, should such a decision be made. Thus, underground structures have to be designed and operated to allow both waste emplacement and removal. Moreover, future decision making about the disposal process will have to rely on a sound technical basis. This implies a data collection scheme and a monitoring program of the facility to check if the disposal process is bound by limits, controls and conditions compatible with (i) a safe operation of the facility and (ii) the state of the facility that the operator wants to achieve at the time of its closure, so that long-term safety is guaranteed. Therefore, technical criteria and key parameters have to be selected and monitored during construction and operation, that is to say for decades. Then, reversibility have to make room for corrective actions, including the retrieval of waste, if something goes wrong and especially if the facility is not seen as safe anymore, especially in the perspective of long-term safety. To

  12. Supplement to safety analysis report. 306-W building operations safety requirement

    International Nuclear Information System (INIS)

    Richey, C.R.

    1979-08-01

    The operations safety requirements (OSRs) presented in this report define the conditions, safe boundaries, and management control needed for safely conducting operations with radioactive materials in the Pacific Northwest Laboratory (PNL) 306-W building. The safety requirements are organized in five sections. Safety limits are safety-related process variables that are observable and measurable. Limiting conditions cover: equipment and technical conditions and characteristics of the facility and operations necessary for continued safe operation. Surveillance requirements prescribe the requirements for checking systems and components that are essential to safety. Equipment design controls require that changes to process equipment and systems be independently checked and approved to assure that the changes will have no adverse effect on safety. Administrative controls describe and discuss the organization and administrative systems and procedures to be used for safe operation of the facility. Details of the implementation of the operations safety requirements are prescribed by internal PNL documents such as criticality safety specifications and radiation work procedures

  13. Operating procedures for emergency situations in EDF PWR plants

    International Nuclear Information System (INIS)

    Depond, G.; Resse, L.

    1992-01-01

    Analysis of incidents and accidents occurring at French and foreign power plants - particularly the TMI accident - and the commissioning of many units in France, as well as tests on simulators, have all demonstrated that an improvement of safety in nuclear power units depends largely on the improvement of the man-machine interface and particularly of emergency operating procedures (EOP). EDF has taken numerous actions in this direction, especially since 1979. First of all, in improving the classical approach based on event-oriented procedures: Rewriting of initial accident operating procedures with regard to their technical contents their form, and the organization of the operating team (procedures I and A); Extension of initial procedures into areas at the limits of design basis and beyond the design basis limits (procedures H). Nevertheless, this approach is subject to several weaknesses. Dependence on a precise initial diagnosis, impossibility to take into account all the conceivable accidental situations, discrepancies between the predicted pattern and the reality. These drawbacks of the event approach have led us to revise the technical conception of the EOPs, and to develop a new approach based on a continuous monitoring of the physical states of the plant and the ability to define a relationship between the physical state of the plant and the operator actions. (author). 4 figs

  14. 75 FR 32295 - Expedited Approval of Alternative Test Procedures for the Analysis of Contaminants Under the Safe...

    Science.gov (United States)

    2010-06-08

    ... Approval of Alternative Test Procedures for the Analysis of Contaminants Under the Safe Drinking Water Act... methods for use in measuring the levels of contaminants in drinking water and determining compliance with... required to measure contaminants in drinking water samples. In addition, EPA Regions as well as States and...

  15. [The transrectus sheath preperitoneal procedure: a safe, effective and cheap surgical approach to inguinal hernia?].

    Science.gov (United States)

    Prins, M W Wiesje; Voropai, D A Dasha; van Laarhoven, C J H M Kees; Akkersdijk, Willem L

    2013-01-01

    The main complication of surgery for inguinal hernia is chronic postoperative pain. This is often reported following the Lichtenstein procedure. A new, open surgical technique for the repair of inguinal hernia has been developed. This procedure is called the transrectus sheath preperitoneal procedure (TREPP). At TREPP a lightweight mesh with a ring made of memory metal is introduced into the preperitoneal space through the transrectus sheath. The first results of this operative technique are very promising: short operation time, short learning curve and not many patients with chronic postoperative pain. In a randomised, multi-centre study which will start mid-2013 (ISRCTN18591339), the TREPP procedure is compared with the transinguinal preperitoneal procedure. The primary outcome measure of this study is chronic postoperative pain.

  16. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  17. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  18. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  19. Operating procedures for the Pajarito Site Critical Assembly Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1983-03-01

    Operating procedures consistent with DOE Order 5480.2, Chapter VI, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Pajarito Site Critical Assembly Facility of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1973 and apply to any criticality experiment performed at the facility

  20. Safe application of a restrictive transfusion protocol in moderate-risk patients undergoing cardiac operations.

    Science.gov (United States)

    Song, Howard K; von Heymann, Christian; Jespersen, Christian M; Karkouti, Keyvan; Korte, Wolfgang; Levy, Jerrold H; Ranucci, Marco; Saugstrup, Trine; Sellke, Frank W

    2014-05-01

    Perioperative red blood cell transfusion is associated with adverse outcomes after cardiac operations. Although restrictive transfusion protocols have been developed, their safety and efficacy are not well demonstrated, and considerable variation in transfusion practice persists. We report our experience with a restrictive transfusion protocol. We analyzed the outcomes in 409 patients undergoing cardiac operations enrolled in a trial conducted at 30 centers worldwide. Blood products were administered on the basis of a transfusion algorithm applied across all centers, with a restrictive transfusion trigger of hemoglobin less than or equal to 6 g/dL. Transfusion was acceptable but not mandatory for hemoglobin 6 to 8 g/dL. For hemoglobin 8 to 10 g/dL, transfusion was acceptable only with evidence for end-organ ischemia. The patient population was moderately complex, with 20.5% having combined procedures and 29.6% having nonelective operations. The mean EuroSCORE for the population was 4.3, which predicted a substantial incidence of morbidity and mortality. Actual outcomes were excellent, with observed mortality of 0.49% and rates of cerebrovascular accident, myocardial infarction, and acute renal failure 1.2%, 6.1%, and 0.98%, respectively. The frequency of red blood cell transfusion was 33.7%, which varied significantly by center. Most transfusions (71.9%) were administered for hemoglobin 6 to 8 g/dL; 21.4% were administered for hemoglobin 8 to 10 g/dL with evidence for end-organ ischemia; 65.0% of patients avoided allogeneic transfusion altogether. A restrictive transfusion protocol can be safely applied in the care of moderate-risk patients undergoing cardiac operations. This strategy has significant potential to reduce transfusion and resource utilization in these patients, standardize transfusion practices across institutions, and increase the safety of cardiac operations. Copyright © 2014 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights

  1. A Neural Networks Based Operation Guidance System for Procedure Presentation and Validation

    International Nuclear Information System (INIS)

    Seung, Kun Mo; Lee, Seung Jun; Seong, Poong Hyun

    2006-01-01

    In this paper, a neural network based operator support system is proposed to reduce operator's errors in abnormal situations in nuclear power plants (NPPs). There are many complicated situations, in which regular and suitable operations should be done by operators accordingly. In order to regulate and validate operators' operations, it is necessary to develop an operator support system which includes computer based procedures with the functions for operation validation. Many computerized procedures systems (CPS) have been recently developed. Focusing on the human machine interface (HMI) design and procedures' computerization, most of CPSs used various methodologies to enhance system's convenience, reliability and accessibility. Other than only showing procedures, the proposed system integrates a simple CPS and an operation validation system (OVS) by using artificial neural network (ANN) for operational permission and quantitative evaluation

  2. 78 FR 37463 - Expedited Approval of Alternative Test Procedures for the Analysis of Contaminants Under the Safe...

    Science.gov (United States)

    2013-06-21

    ... Approval of Alternative Test Procedures for the Analysis of Contaminants Under the Safe Drinking Water Act... page 32570, with the table entitled ``ALTERNATIVE TESTING METHODS FOR CONTAMINANTS LISTED AT 40 CFR 141... Contaminants Listed at 40 CFR 141.25(a) SM 21st Edition SM 22nd Edition Contaminant Methodology \\1\\ \\28\\ ASTM...

  3. The European Stroke Organisation Guidelines: a standard operating procedure

    DEFF Research Database (Denmark)

    Ntaios, George; Bornstein, Natan M; Caso, Valeria

    2015-01-01

    pace with this progress and driven by the strong determination of the European Stroke Organisation to further promote stroke management, education, and research, the European Stroke Organisation decided to delineate a detailed standard operating procedure for its guidelines. There are two important...... cornerstones in this standard operating procedure: The first is the implementation of the Grading of Recommendations Assessment, Development, and Evaluation methodology for the development of its Guideline Documents. The second one is the decision of the European Stroke Organisation to move from the classical...... and significant input from European Stroke Organisation members as well as methodologists and analysts, this document presents the official standard operating procedure for the development of the Guideline Documents of the European Stroke Organisation....

  4. State Token Petri Net modeling method for formal verification of computerized procedure including operator's interruptions of procedure execution flow

    International Nuclear Information System (INIS)

    Kim, Yun Goo; Seong, Poong Hyun

    2012-01-01

    The Computerized Procedure System (CPS) is one of the primary operating support systems in the digital Main Control Room. The CPS displays procedure on the computer screen in the form of a flow chart, and displays plant operating information along with procedure instructions. It also supports operator decision making by providing a system decision. A procedure flow should be correct and reliable, as an error would lead to operator misjudgement and inadequate control. In this paper we present a modeling for the CPS that enables formal verification based on Petri nets. The proposed State Token Petri Nets (STPN) also support modeling of a procedure flow that has various interruptions by the operator, according to the plant condition. STPN modeling is compared with Coloured Petri net when they are applied to Emergency Operating Computerized Procedure. A converting program for Computerized Procedure (CP) to STPN has been also developed. The formal verification and validation methods of CP with STPN increase the safety of a nuclear power plant and provide digital quality assurance means that are needed when the role and function of the CPS is increasing.

  5. Emergency operating procedure upgrade program and audit results

    International Nuclear Information System (INIS)

    Graham, P.D.

    1989-01-01

    This paper describes the method and results of upgrading the River Bend station boiling water reactor 6 emergency operating procedures (EOPs). The upgrade program replaced difficult-to-implement narrative procedures with well-developed flowcharts. The flowcharts eliminate a number of human factors problems, are user friendly, provide for easy implementation, and provide technical information in a clear, concise format. Positive results were seen immediately. The operating crews found the flowcharts to be clear, understandable, and usable. Simulator training and EOP implementation became something that the operators no longer dreaded, and their confidence in their ability to control emergency situations was greatly improved. The paper provides a summary of the EOP upgrade program

  6. CAI and training system for the emergency operation procedure in the advanced thermal reactor, FUGEN

    International Nuclear Information System (INIS)

    Kozaki, T.; Imanaga, K.; Nakamura, S.; Maeda, K.; Sakurai, N.; Miyamoto, M.

    2003-01-01

    In the Advanced Thermal Reactor (ATR ) of the JNC, 'FUGEN', a symptom based Emergency Operating Procedure (EOF) was introduced in order to operate Fugen more safely and it became necessary for the plant operators to master the EOF. However it took a lot of time for the instructor to teach the EOP to operators and to train them. Thus, we have developed a Computer Aided Instruction (CAI) and Training System for the EOP, by which the operators can learn the EOP and can be trained. This system has two major functions, i.e., CAI and training. In the CAI function, there are three learning courses, namely, the EOP procedure, the simulation with guidance and Q and A, and the free simulation. In the training function, all of necessary control instruments (indicators, switches, annunciators and so forth) and physics models for the EOP training are simulated so that the trainees can be trained for all of the EOPs. In addition, 50 kinds of malfunction models are installed in order to perform appropriate accident scenarios for the EOP. The training of the EOP covers the range from AOO (Anticipated Operational Occurrence) to Over-DBAs (Design Based Accidents). This system is built in three personal computers that are connected by the computer network. One of the computers is expected to be used for the instructor and the other two are for the trainees. The EOP is composed of eight guidelines, such as 'Reactor Control' and 'Depression and Cooling', and the operation screens which are corresponded to the guidelines are respectively provided. According to the trial, we have estimated that the efficiency of the learning and the training would be improved about 30% for the trainee and about 75% for the instructor in the actual learning and training. (author)

  7. Initial Investigations of Controller Tools and Procedures for Schedule-Based Arrival Operations with Mixed Flight-Deck Interval Management Equipage

    Science.gov (United States)

    Callantine, Todd J.; Cabrall, Christopher; Kupfer, Michael; Omar, Faisal G.; Prevot, Thomas

    2012-01-01

    NASA?s Air Traffic Management Demonstration-1 (ATD-1) is a multi-year effort to demonstrate high-throughput, fuel-efficient arrivals at a major U.S. airport using NASA-developed scheduling automation, controller decision-support tools, and ADS-B-enabled Flight-Deck Interval Management (FIM) avionics. First-year accomplishments include the development of a concept of operations for managing scheduled arrivals flying Optimized Profile Descents with equipped aircraft conducting FIM operations, and the integration of laboratory prototypes of the core ATD-1 technologies. Following each integration phase, a human-in-the-loop simulation was conducted to evaluate and refine controller tools, procedures, and clearance phraseology. From a ground-side perspective, the results indicate the concept is viable and the operations are safe and acceptable. Additional training is required for smooth operations that yield notable benefits, particularly in the areas of FIM operations and clearance phraseology.

  8. D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Operating Procedures

    International Nuclear Information System (INIS)

    Hance, R.

    1998-01-01

    This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).

  9. Unmanned Aircraft Systems Traffic Management (UTM) Safely Enabling UAS Operations in Low-Altitude Airspace

    Science.gov (United States)

    Kopardekar, Parimal H.

    2016-01-01

    Unmanned Aircraft System (UAS) Traffic Management (UTM) Enabling Civilian Low-Altitude Airspace and Unmanned Aircraft System Operations What is the problem? Many beneficial civilian applications of UAS have been proposed, from goods delivery and infrastructure surveillance, to search and rescue, and agricultural monitoring. Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. A UAS traffic management (UTM) system for low-altitude airspace may be needed, perhaps leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today, whether the vehicles are driven by humans or are automated. What system technologies is NASA exploring? Building on its legacy of work in air traffic management for crewed aircraft, NASA is researching prototype technologies for a UAS Traffic Management (UTM) system that could develop airspace integration requirements for enabling safe, efficient low-altitude operations. While incorporating lessons learned from the today's well-established air traffic management system, which was a response that grew out of a mid-air collision over the Grand Canyon in the early days of commercial aviation, the UTM system would enable safe and efficient low-altitude airspace operations by providing services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning and re-routing, separation management, sequencing and spacing, and contingency management. One of the attributes of the UTM system is that it would not require human operators to monitor every vehicle continuously. The system could provide to human managers the data to make strategic decisions related to initiation, continuation, and termination of airspace operations. This approach would ensure that only authenticated UAS could operate

  10. Towards Verification of Operational Procedures Using Auto-Generated Diagnostic Trees

    Science.gov (United States)

    Kurtoglu, Tolga; Lutz, Robyn; Patterson-Hine, Ann

    2009-01-01

    The design, development, and operation of complex space, lunar and planetary exploration systems require the development of general procedures that describe a detailed set of instructions capturing how mission tasks are performed. For both crewed and uncrewed NASA systems, mission safety and the accomplishment of the scientific mission objectives are highly dependent on the correctness of procedures. In this paper, we describe how to use the auto-generated diagnostic trees from existing diagnostic models to improve the verification of standard operating procedures. Specifically, we introduce a systematic method, namely the Diagnostic Tree for Verification (DTV), developed with the goal of leveraging the information contained within auto-generated diagnostic trees in order to check the correctness of procedures, to streamline the procedures in terms of reducing the number of steps or use of resources in them, and to propose alternative procedural steps adaptive to changing operational conditions. The application of the DTV method to a spacecraft electrical power system shows the feasibility of the approach and its range of capabilities

  11. The development of symptoms-oriented operating procedures

    International Nuclear Information System (INIS)

    Colquhoun, R.

    1983-04-01

    Until recently the formal treatment of control room procedures for nuclear power plant upset conditions has been event-oriented. The demise of Three Mile Island, Unit 2, caused the American industry to recognize the pitfalls inherent in relying totally on event-oriented procedures, and led to the initiation of a program for the development of a symptoms-oriented approach for handling upset conditions. The U.S. program has been independently paralleled by a Canadian program. This paper describes the development of the Canadian symptoms-oriented philosophy and identifies the relevance of a generic symptoms based emergency procedure to current operating practices

  12. Electronic Procedures for Medical Operations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Electronic procedures are currently being used to document the steps in performing medical operations for the Space Shuttle and/or the International Space Station...

  13. Laparoscopy is safe among patients with congestive heart failure undergoing general surgery procedures.

    Science.gov (United States)

    Speicher, Paul J; Ganapathi, Asvin M; Englum, Brian R; Vaslef, Steven N

    2014-08-01

    Over the past 2 decades, laparoscopy has been established as a superior technique in many general surgery procedures. Few studies, however, have examined the impact of the use of a laparoscopic approach in patients with symptomatic congestive heart failure (CHF). Because pneumoperitoneum has known effects on cardiopulmonary physiology, patients with CHF may be at increased risk. This study examines current trends in approaches to patients with CHF and effects on perioperative outcomes. The 2005-2011 National Surgical Quality Improvement Program Participant User File was used to identify patients who underwent the following general surgery procedures: Appendectomy, segmental colectomy, small bowel resection, ventral hernia repair, and splenectomy. Included for analysis were those with newly diagnosed CHF or chronic CHF with new signs or symptoms. Trends of use of laparoscopy were assessed across procedure types. The primary endpoint was 30-day mortality. The independent effect of laparoscopy in CHF was estimated with a multiple logistic regression model. A total of 265,198 patients were included for analysis, of whom 2,219 were identified as having new or recently worsened CHF. Of these patients, there were 1,300 (58.6%) colectomies, 486 (21.9%) small bowel resections, 216 (9.7%) ventral hernia repairs, 141 (6.4%) appendectomies, and 76 (3.4%) splenectomies. Laparoscopy was used less frequently in patients with CHF compared with their non-CHF counterparts, particularly for nonelective procedures. Baseline characteristics were similar for laparoscopy versus open procedures with the notable exception of urgent/emergent case status (36.4% vs 71.3%; P surgery procedures, particularly in urgent/emergent cases. Despite these patterns and apparent preferences, laparoscopy seems to offer a safe alternative in appropriately selected patients. Because morbidity and mortality were considerable regardless of approach, further understanding of appropriate management in this

  14. Application of digital solutions to help the safe and efficient operation of nuclear power plants

    International Nuclear Information System (INIS)

    Ortega P, F.; Fernandez F, S.

    2017-09-01

    In the search for excellence, the emergence of solutions to digitize nuclear power plants is an opportunity to optimize the operation and safety of them. The new technologies available today in the market, applied under a global vision of the operation, can contribute to the excellent operation of nuclear power plants in terms of efficiency and effectiveness. Tecnatom has a long experience in various areas related to the operation of the plants, giving the aforementioned global vision, essential to develop global solutions that pursue the safe and efficient operation of the operation. (Author)

  15. IAEA-NULIFE VERLIFE - Procedure for integrity and lifetime assessment of components and piping in WWER NPPs during operation - Tool for LTO

    International Nuclear Information System (INIS)

    Brumovsky, M.

    2012-01-01

    VERLIFE - 'Unified Procedure for Lifetime Assessment of Components and Piping in WWER NPPs during Operation' was developed within the 5th Framework Programme of the European Union in 2003 and later upgraded within the 6th Framework Programme 'COVERS - Safety of WWER NPPs' of the European Union in 2008. This Procedure had to fill the gap in original Soviet/Russian Codes and Rules for WWER type NPPs, as these codes were developed only for design and manufacture and were not changed since their second edition in 1989. VERLIFE Procedure is based on these Russian codes but incorporates also new developments in research, mainly in fracture mechanics, and also some principal approaches used in PWR codes. To assure that VERLIFE Procedure will remain a living document, new 3-years IAEA project (in close cooperation with another project of the 6th Framework Programme of the European Union 'NULIFE - Plant Life Management of NPPs') has started in 2009. Final document, was approved by expert groups of the IAEA and NULIFE in June 28-30, 2011, and will be issued as 'IAEA/NULIFE Guidelines for Integrity and Lifetime Assessment of Components and Piping in WWER NPPs during Operation'. This document represents a necessary part for any integrity and lifetime assessment during operation that is a bases for further decision about safe and potential long term operation. To prepare documents like TLAA, it is necessary to have a tool that is able to evaluate lifetime of the main NPP components taking into account existing past operation as well as proposal for the future. (author)

  16. Developing operating procedures for a low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures.

  17. Developing operating procedures for a low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G.

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures

  18. Plant life time management for safe long term operation

    International Nuclear Information System (INIS)

    Burket, Danes

    2010-01-01

    The topics discussed include LTO (long-term operation) and licensing procedure in general and specifically for the Dukovany NPP, components of an LTO programme, the PLIM (plant life management) concept for Dukovany and Temelin, the LTO implementation project for Dukovany, LTO strategy, LTO risk study, international verification. The Conclusions include the following items: (i) Technical-economic study of Dukovany NPP LTO demonstrates technical feasibility and economic profitability of Dukovany NPP LTO with perspective for up to 60 years of operation. (ii) Safety part of Program for assurance of Dukovany NPP LTO complies with IAEA SALTO recommendations. (iii) Dukovany NPP LTO programme incorporated IAEA SALTO Peer Review Mission recommendations. (iv) LTO Implementation Project for 2009-2015 was approved with major targets to renew operational permission and prepare NPP for operation up to 60 years. (v) Preparation of Temelin NPP LTO programme has been started. (P.A.)

  19. Improvement of Safety Features in Standard Operation Procedure of Tc-99m Generator

    International Nuclear Information System (INIS)

    Manisah Saedon; Mohd Khairul Hakimi; Shyen, A.K.S.

    2011-01-01

    This paper describes the improvements proposed to the original production procedures for Tc-99m generators. Improvements are intended to add safety and health features for workers into the existing procedures. The difference between the new safe work procedures from the original work procedures; is the concern about the safety and health of employees other than the product safety. One of the suggested safety characteristics is by using the visual aid so that the workers can easily see and read the procedures when they perform their duties, whereas the previous procedures are kept in the manual and difficult to access. The purpose of this paper is to share information about the importance of safety and health features for the workers in the procedures established in addition to provide awareness to all parties involved. (author)

  20. UNC Nuclear Industries' human-factored approach to the operating or maintenance procedure

    International Nuclear Information System (INIS)

    Nelson, A.A.; Clark, J.E.

    1982-01-01

    The development of Human Factors Engineering (HFE) and UNC Nuclear Industries' (UNC) commitment to minimizing the potential for human error in the performance of operating or maintenance procedures have lead to a procedure upgrade program. Human-factored procedures were developed using information from many sources including, but not limited to, operators, a human factors specialist, engineers and supervisors. This has resulted in the Job Performance Aid (JPA). This paper presents UNC's approach to providing human-factored operating and maintenance procedures

  1. A symptom based decision tree approach to boiling water reactor emergency operating procedures

    International Nuclear Information System (INIS)

    Knobel, R.C.

    1984-01-01

    This paper describes a Decision Tree approach to development of BWR Emergency Operating Procedures for use by operators during emergencies. This approach utilizes the symptom based Emergency Procedure Guidelines approved for implementation by the USNRC. Included in the paper is a discussion of the relative merits of the event based Emergency Operating Procedures currently in use at USBWR plants. The body of the paper is devoted to a discussion of the Decision Tree Approach to Emergency Operating Procedures soon to be implemented at two United States Boiling Water Reactor plants, why this approach solves many of the problems with procedures indentified in the post accident reviews of Three Mile Island procedures, and why only now is this approach both desirable and feasible. The paper discusses how nuclear plant simulators were involved in the development of the Emergency Operating Procedure decision trees, and in the verification and validation of these procedures. (orig./HP)

  2. Main corrective measures in an early phase of nuclear power plants’ preparation for safe long term operation

    Energy Technology Data Exchange (ETDEWEB)

    Krivanek, Robert, E-mail: r.krivanek@iaea.org [International Atomic Energy Agency (IAEA), Department of Nuclear Safety and Security, Operational Safety Section, Vienna 1400 (Austria); Fiedler, Jan, E-mail: fiedler@fme.vutbr.cz [University of Technology Brno, Faculty of Mechanical Engineering, Energy Institute, Technická 2896/2, 616 69 Brno (Czech Republic)

    2017-05-15

    Highlights: • Results of SALTO missions provide the most important issues for safe long term operation (LTO) of nuclear power plants. • The most important technical corrective measures in an early phase of preparation for safe LTO are described. • Their satisfactory resolution creates a basis for further activities to demonstrate preparedness for safe LTO. - Abstract: This paper presents the analysis of main technical deficiencies of nuclear power plants (NPPs) in preparedness for safe long term operation (LTO) and the main corrective measures in an early phase of preparation for safe LTO of NPPs. It focuses on technical aspects connected with management of physical ageing of NPP structures, systems and components (SSCs). It uses as a basis results of IAEA SALTO missions performed between 2005 and 2016 (see also paper NED8805 in Nuclear Engineering and Design in May 2016) and the personal experiences of the authors with preparation of NPPs for safe LTO. This paper does not discuss other important aspects of safe LTO of NPPs, e.g. national nuclear energy policies, compliance of NPPs with the latest international requirements on design, obsolescence, environmental impact and economic aspects of LTO. Chapter 1 provides a brief introduction of the current status of the NPP’ fleet in connection with LTO. Chapter 2 provides an overview of SALTO peer review service results with a focus on deficiencies related to physical ageing of safety SSCs and a demonstration that SSCs will perform their safety function during the intended period of LTO. Chapter 3 discusses the main corrective measures which NPPs typically face during the preparation for demonstration of safe LTO. Chapter 4 summarizes the current status of the NPP’ fleet in connection with LTO and outlines further steps needed in preparation for safe LTO.

  3. Supporting plant operation through computer-based procedures

    International Nuclear Information System (INIS)

    Martinez, Victor; Medrano, Javier; Mendez, Julio

    2014-01-01

    Digital Systems are becoming more important in controlling and monitoring nuclear power plant operations. The capabilities of these systems provide additional functions as well as support operators in making decisions and avoiding errors. Regarding Operation Support Systems, an important way of taking advantage of these features is using computer-based procedures (CBPs) tools that enhance the plant operation. Integrating digital systems in analogue controls at nuclear power plants in operation becomes an extra challenge, in contrast to the integration of Digital Control Systems in new nuclear power plants. Considering the potential advantages of using this technology, Tecnatom has designed and developed a CBP platform taking currently operating nuclear power plants as its design basis. The result is a powerful tool which combines the advantages of CBPs and the conventional analogue control systems minimizing negative effects during plant operation and integrating operation aid-systems to support operators. (authors)

  4. A method for risk informing procedures at operating nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, P. F.; Martin del Campo, C., E-mail: pnelson_007@yahoo.com [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Paseo Cuauhnahuac No. 8532, Col. Progreso, 62550 Jiutepec, Morelos (Mexico)

    2012-10-15

    The technical approach presented establishes a framework intended to provide the necessary elements for a deployable human performance monitoring program that incorporates insights from plant specific probabilistic risk assessments, human reliability analysis, as well as the development of plant specific human failure data. A human performance monitoring program of this structure would be used to provide the ability to risk inform procedures (e.g., operations or maintenance) to determine the operational risk significance of procedural performance (i.e., precautions, prerequisites, procedure steps), the likelihood of consequential human error dur the performance of the procedure, and the identification of procedure specific barriers to reduce or eliminate consequential human errors. The program would provide the means to assess procedures prior to execution and the means to record and trend human failure events leading to a plant specific human failure database for human activities characterized as pre-initiator. The technical methods and data processing for each of these areas are developed and presented, as well as an example application of an operational procedure error leading to a plant level event (i.e, plant trip). (Author)

  5. Evaluation of Computer-Based Procedure System Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Johanna Oxstrand; Katya Le Blanc; Seth Hays

    2012-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE), performed in close collaboration with industry R&D programs, to provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The introduction of advanced technology in existing nuclear power plants may help to manage the effects of aging systems, structures, and components. In addition, the incorporation of advanced technology in the existing LWR fleet may entice the future workforce, who will be familiar with advanced technology, to work for these utilities rather than more newly built nuclear power plants. Advantages are being sought by developing and deploying technologies that will increase safety and efficiency. One significant opportunity for existing plants to increase efficiency is to phase out the paper-based procedures (PBPs) currently used at most nuclear power plants and replace them, where feasible, with computer-based procedures (CBPs). PBPs have ensured safe operation of plants for decades, but limitations in paper-based systems do not allow them to reach the full potential for procedures to prevent human errors. The environment in a nuclear power plant is constantly changing depending on current plant status and operating mode. PBPs, which are static by nature, are being applied to a constantly changing context. This constraint often results in PBPs that are written in a manner that is intended to cover many potential operating scenarios. Hence, the procedure layout forces the operator to search through a large amount of irrelevant information to locate the pieces of information

  6. Integration of emergency action levels with Combustion Engineering Emergency Operating Procedures

    International Nuclear Information System (INIS)

    Faletti, D.W.; Jamison, J.D.

    1985-09-01

    This report documents the development of a method for integrating Emergency Action Levels (EALs) with plant-specific Emergency Operating Procedures (EOPs) using the Combustion Engineering Owners' Group Emergency Operating Procedure Technical Guidelines (CEOG EOPTFs). EALs are discrete conditions or values of plant operating parameters which, if exceeded, require declaration of an appropriate level of emergency. At most operating plants, the EALs and event classification procedures are totally separate from the Emergency Operating Procedures used by the plant staff to control the plant during abnormal conditions. Control room personnel using the EOPs to deal with abnormal plant conditions must recognize when plant safety is sufficiently degraded that an emergency declaration may be warranted, and then enter a separate classification procedure containing EALs for a number of plant conditions and parameters. The operator then compares the existing plant conditions to the EALs and makes an emergency declaration accordingly. Using the Combustion Engineering Owners' Group Technical Guidelines document, a set of emergency class definitions and criteria were developed based on the status of the three main fission product barriers (fuel cladding, primary coolant system and containment). The EOPTGs were then annotated with suggested guidance to a procedure writer. The proposed method was tested by applying it to the reactor accident sequences that were shown in the reactor safety study to dominate accident risk. The object of the test was to determine if an EAL set linked to the EOP annotations would produce timely and accurate classification of the risk-dominant sequences. 6 refs., 13 figs., 31 tabs

  7. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jeong, Kwangsup; Jung, Wondea

    2005-01-01

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operators' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration

  8. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jinkyun [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of)]. E-mail: kshpjk@kaeri.re.kr; Jeong, Kwangsup [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of); Jung, Wondea [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of)

    2005-08-01

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operators' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration.

  9. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Jinkyun Park; Kwangsup Jeong; Wondea Jung [Korea Atomic Energy Research Institute, Taejon (Korea). Integrated Safety Assessment Division

    2005-08-15

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operator' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration. (author)

  10. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  11. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  12. Control procedure for well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Bourdon, J C

    1988-09-09

    A control procedure of rotary drilling operations is proposed. It uses the Drill off test. The drill-off test permits to determine the rock drill speed variation as a function of the wright applied on the top of the pipe. We can deduce from that a rock drill wear parameter. The method permits to prevent a rupture and its grave economic consequences.

  13. Hanford high level waste (HLW) tank mixer pump safe operating envelope reliability assessment

    International Nuclear Information System (INIS)

    Fischer, S.R.; Clark, J.

    1993-01-01

    The US Department of Energy and its contractor, Westinghouse Corp., are responsible for the management and safe storage of waste accumulated from processing defense reactor irradiated fuels for plutonium recovery at the Hanford Site. These wastes, which consist of liquids and precipitated solids, are stored in underground storage tanks pending final disposition. Currently, 23 waste tanks have been placed on a safety watch list because of their potential for generating, storing, and periodically releasing various quantities of hydrogen and other gases. Tank 101-SY in the Hanford SY Tank Farm has been found to release hydrogen concentrations greater than the lower flammable limit (LFL) during periodic gas release events. In the unlikely event that an ignition source is present during a hydrogen release, a hydrogen burn could occur with a potential to release nuclear waste materials. To mitigate the periodic gas releases occurring from Tank 101-SY, a large mixer pump currently is being installed in the tank to promote a sustained release of hydrogen gas to the tank dome space. An extensive safety analysis (SA) effort was undertaken and documented to ensure the safe operation of the mixer pump after it is installed in Tank 101-SY.1 The SA identified a need for detailed operating, alarm, and abort limits to ensure that analyzed safety limits were not exceeded during pump operations

  14. Energy conservation aircraft design and operational procedures

    Energy Technology Data Exchange (ETDEWEB)

    Poisson-Quinton, P.

    1978-01-01

    The paper reviews studies associated with improved fuel efficiency. Several aircraft design concepts are described including: (1) increases in aerodynamic efficiency through decreased friction drag, parasitic drag, and drag due to lift, (2) structural efficiency and the implementation of composite materials, (3) active control technology, (4) the optimization of airframe-engine integration, and (5) VTOL and STOL concepts. Consideration is also given to operational procedures associated with flight management, terminal-area operations, and the influence of environmental noise constraints on fuel economy.

  15. Safely Enabling Civilian Unmanned Aerial System (UAS) Operations in Low-Altitude Airspace by Unmanned Aerial System Traffic Management (UTM)

    Science.gov (United States)

    Kopardekar, Parimal Hemchandra

    2015-01-01

    Many UAS will operate at lower altitude (Class G, below 2000 feet). There is an urgent need for a system for civilian low-altitude airspace and UAS operations. Stakeholders want to work with NASA to enable safe operations.

  16. Light duty utility arm (LDUA) operability test report (OTR)

    International Nuclear Information System (INIS)

    Conrad, R.B.

    1997-01-01

    The objective of the test was to demonstrate that the LDUA and subsystems that are applicable to the T-106 deployment could be safely deployed in the field and operated as designed per the operating procedures

  17. Improving operator quality at Genkai Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kuwano, Takeshi.

    1989-01-01

    Improvement in operator quality, or improvement in an operator's skill and professional knowledge, is of prime importance because of its great influence on safe and steady plant operation. This paper describes the education and training of reactor operators at the Genkai pressurized water reactor nuclear power plant with respect to the following topics: organization of Genkai power plant; education and training program management; training at the Nuclear Training Center; training and education on-site including emergency procedures training, normal operating procedures training, informational study of emergency conditions in existing plants, and all-around training of operators; qualifying tests for supervisors; and operator motivation

  18. Evaluation of nuclear power plant operating procedures classifications and interfaces: Problems and techniques for improvement

    International Nuclear Information System (INIS)

    Barnes, V.E.; Radford, L.R.

    1987-02-01

    This report presents activities and findings of a project designed to evaluate current practices and problems related to procedure classification schemes and procedure interfaces in commercial nuclear power plants. The phrase ''procedure classification scheme'' refers to how plant operating procedures are categorized and indexed (e.g., normal, abnormal, emergency operating procedures). The term ''procedure interface'' refers to how reactor operators are instructed to transition within and between procedures. The project consisted of four key tasks, including (1) a survey of literature regarding problems associated with procedure classifications and interfaces, as well as techniques for overcoming them; (2) interviews with experts in the nuclear industry to discuss the appropriate scope of different classes of operating procedures and techniques for managing interfaces between them; (3) a reanalysis of data gathered about nuclear power plant normal operating and off-normal operating procedures in a related project, ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants''; and (4) solicitation of the comments and expert opinions of a peer review group on the draft project report and on proposed techniques for resolving classification and interface issues. In addition to describing these activities and their results, recommendations for NRC and utility actions to address procedure classification and interface problems are offered

  19. Experimental studies of computerized procedures and team size in nuclear power plant operations

    International Nuclear Information System (INIS)

    Huang, F.-H.; Hwang, S.-L.

    2009-01-01

    The operation of a nuclear power plant is so complex that it requires teamwork. To support team performance, a system need to provide all team members integrated information displays as well as decision aids (e.g., computerized procedures). Two experiments were conducted to investigate the effects of computerized procedures and team size on operating performance. Forty-five participants were involved in the experiments. Each participant executed decision and action tasks to deal with alarm signals, while detecting occasional system errors in the interface. Results showed that effects of computerized procedures were significant on various performance indicators, such as operation time, operation errors, and learning effect, and that two operators would be a satisfactory size in the teamwork system providing computerized procedures

  20. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  1. On the design of flight-deck procedures

    Science.gov (United States)

    Degani, Asaf; Wiener, Earl L.

    1994-01-01

    In complex human-machine systems, operations, training, and standardization depend on a elaborate set of procedures which are specified and mandated by the operational management of the organization. The intent is to provide guidance to the pilots, to ensure a logical, efficient, safe, and predictable means of carrying out the mission objectives. In this report the authors examine the issue of procedure use and design from a broad viewpoint. The authors recommend a process which we call 'The Four P's:' philosophy, policies, procedures, and practices. We believe that if an organization commits to this process, it can create a set of procedures that are more internally consistent, less confusing, better respected by the flight crews, and that will lead to greater conformity. The 'Four-P' model, and the guidelines for procedural development in appendix 1, resulted from cockpit observations, extensive interviews with airline management and pilots, interviews and discussion at one major airframe manufacturer, and an examination of accident and incident reports. Although this report is based on airline operations, we believe that the principles may be applicable to other complex, high-risk systems, such as nuclear power production, manufacturing process control, space flight, and military operations.

  2. Integrated Life Cycle Management: A Strategy for Plants to Extend Operating Lifetimes Safely with High Operational Reliability

    International Nuclear Information System (INIS)

    Esselman, Thomas; Bruck, Paul; Mengers, Charles

    2012-01-01

    Nuclear plant operators are studying the possibility of extending their existing generating facilities operating lifetime to 60 years and beyond. Many nuclear plants have been granted licenses to operate their facilities beyond the original 40 year term; however, in order to optimize the long term operating strategies, plant decision-makers need a consistent approach to support their options. This paper proposes a standard methodology to support effective decision-making for the long-term management of selected station assets. Methods detailed are intended to be used by nuclear plant site management, equipment reliability personnel, long term planners, capital asset planners, license renewal staff, and others that intend to look at operation between the current time and the end of operation. This methodology, named Integrated Life Cycle Management (ILCM), will provide a technical basis to assist decision makers regarding the timing of large capital investments required to get to the end of operation safely and with high plant reliability. ILCM seeks to identify end of life cycle failure probabilities for individual plant large capital assets and attendant costs associated with their refurbishment or replacement. It will provide a standard basis for evaluation of replacement and refurbishment options for these components. ILCM will also develop methods to integrate the individual assets over the entire plant thus assisting nuclear plant decision-makers in their facility long term operating strategies. (author)

  3. Who's Got the Bridge? - Towards Safe, Robust Autonomous Operations at NASA Langley's Autonomy Incubator

    Science.gov (United States)

    Allen, B. Danette; Cross, Charles D.; Motter, Mark A.; Neilan, James H.; Qualls, Garry D.; Rothhaar, Paul M.; Tran, Loc; Trujillo, Anna C.; Crisp, Vicki K.

    2015-01-01

    NASA aeronautics research has made decades of contributions to aviation. Both aircraft and air traffic management (ATM) systems in use today contain NASA-developed and NASA sponsored technologies that improve safety and efficiency. Recent innovations in robotics and autonomy for automobiles and unmanned systems point to a future with increased personal mobility and access to transportation, including aviation. Automation and autonomous operations will transform the way we move people and goods. Achieving this mobility will require safe, robust, reliable operations for both the vehicle and the airspace and challenges to this inevitable future are being addressed now in government labs, universities, and industry. These challenges are the focus of NASA Langley Research Center's Autonomy Incubator whose R&D portfolio includes mission planning, trajectory and path planning, object detection and avoidance, object classification, sensor fusion, controls, machine learning, computer vision, human-machine teaming, geo-containment, open architecture design and development, as well as the test and evaluation environment that will be critical to prove system reliability and support certification. Safe autonomous operations will be enabled via onboard sensing and perception systems in both data-rich and data-deprived environments. Applied autonomy will enable safety, efficiency and unprecedented mobility as people and goods take to the skies tomorrow just as we do on the road today.

  4. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    Science.gov (United States)

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  5. Conditions Of Safe Ship Operations And Sea Waterway Parameters Based On The Reconstruction Of Świnoujście-Szczecin Fairway

    Directory of Open Access Journals (Sweden)

    Gucma Stanisław

    2015-09-01

    Full Text Available This paper describes the state vector of safe ship operation on sea waterways. The author determines relationships between the state vector of safe ship operation and parameters of sea waterway system elements. These include three subsystems: area, navigation and traffic control. These relationships have been exemplified with the 68-kilometre Świnoujście-Szczecin fairway, presently under reconstruction. A systematic approach to sea waterway design is globally unique.

  6. Target Trailing With Safe Navigation With Colregs for Maritime Autonomous Surface Vehicles

    Science.gov (United States)

    Kuwata, Yoshiaki (Inventor); Wolf, Michael T. (Inventor); Zarzhitsky, Dimitri V. (Inventor); Aghazarian, Hrand (Inventor); Huntsberger, Terrance L. (Inventor); Howard, Andrew B. (Inventor)

    2014-01-01

    Systems and methods for operating autonomous waterborne vessels in a safe manner. The systems include hardware for identifying the locations and motions of other vessels, as well as the locations of stationary objects that represent navigation hazards. By applying a computational method that uses a maritime navigation algorithm for avoiding hazards and obeying COLREGS using Velocity Obstacles to the data obtained, the autonomous vessel computes a safe and effective path to be followed in order to accomplish a desired navigational end result, while operating in a manner so as to avoid hazards and to maintain compliance with standard navigational procedures defined by international agreement. The systems and methods have been successfully demonstrated on water with radar and stereo cameras as the perception sensors, and integrated with a higher level planner for trailing a maneuvering target.

  7. Short-term Results of Retrograde Intrarenal Surgery in the Management of Kidney Stones in Children: A Safe and Efficacious Procedure

    Directory of Open Access Journals (Sweden)

    Emrah Yürük

    2015-03-01

    Full Text Available Aim: To demonstrate the feasibility of retrograde intrarenal surgery (RIRS in pediatric age group. Methods: Data of patients who underwent RIRS for the treatment of kidney stones were retrospectively analyzed. The procedure was performed using 7.5 Fr FlexX™ 2 flexible ureterorenoscope in all patients. Ureteral access sheath was not used in any patients. A double-j stent was inserted and the procedure was delayed for 2 weeks whenever access to the ureter was not possible. The stones were fragmented using laser and fragments smaller than 2 mm were left for spontaneous passage. Postoperative success was evaluated using ultrasonography and kidney, ureter and bladder (KUB x-ray. Results: 14 patients with a mean age of 7.5±2.47 (range: 3-12 years were included. Male to female ratio was 8/6 and six patients had a stone on the right side. The mean stone size was 12.3±3.49 (range: 8-20 mm. Of the patients, 10 had a history of unsuccessful shock wave lithotripsy (SWL treatment. Mean operation and fluoroscopy screening times were 33.5±6.9 (range: 25-45 and 45.3±15.4 (range: 30-75 minutes, respectively. The median hospital stay was 1.07±0.2 (range: 1-2 days. No major complications were noticed during the operation. Double-J stents were removed on the 2nd postoperative week and all patients were stone-free during the follow-up. Conclusion: RIRS can be performed safely and efficaciously in pediatric patients. (The Medical Bulletin of Haseki 2015; 53:52-6

  8. Proceedings of the conference on the Safety in Reactor Operations - TopSafe 2012 Transactions

    International Nuclear Information System (INIS)

    2012-01-01

    TopSafe 2012 provides a forum for addressing the current status and future perspectives with regards to safety at nuclear installations worldwide. In view of the on-going discussions and initiatives that have been taken over the last months the European Nuclear Society (ENS) decided organising this edition of this topical conference from 22 to 26 April 2012 in Helsinki, Finland. TopSafe 2012 focus on three main subjects: Safety and related analyses in operating nuclear power plants and other nuclear installations; Safety and Risk Assessment; Trends in nuclear safety for existing and future installations. The conference is directed at a broad range of experts in the area of nuclear safety, including professionals from the different disciplines involved in the safety of nuclear power plants, fuel cycle installations and research reactors. It is aimed at professionals coming from the research organisations, universities, vendors, operators, regulatory bodies as well as policy makers. Top level representatives of the Countries that are constructing new nuclear power plants are invited. Regulators of all individual Countries with nuclear programme are expected to contribute the Conference. (authors)

  9. Are the surgeons safe during UV-A radiation exposure in collagen cross-linking procedure?

    Science.gov (United States)

    Shetty, Rashmi; Shetty, Rohit; Mahendradas, Padmamalini; Shetty, Bhujang K

    2012-02-01

    To quantify the effect of scattered UV-A radiation used in the collagen cross-linking (CXL) procedure and the amount of radiation reaching the surgeon and the surrounding area and to estimate the dampening effect by various protective devices. In this case series, 3 patients [aged 25-30 (±2.5) years] with keratoconus underwent a CXL procedure with UV-A light and riboflavin. Irradiance was measured using a spectrometer (Model USB2000; Ocean Optics, Inc) for various distances from the source, at various angles, and for different durations of radiation. The spectrometer was also used to measure the dampening effect produced by gown, latex gloves, and UV-protective glasses. Maximum UV-A radiation (1.4 × 10(-9) mW/cm(2)) was measured at 2 cm from the limbus, when the probe was held at a 45-degree angle to the floor. UV-A radiation reaching the surgeon's eye and the abdomen was 3.403 × 10(-11) and 2.36 × 10(-11) mW/cm(2), respectively. Gown, latex gloves, and UV-protective glasses showed dampening effects of 99.58%, 95.01%, and 99.73%, respectively. CXL appears to be a safe procedure with respect to UV-A radiation exposure to the surgeon. Further safety can be ensured by UV-protective devices.

  10. Automated operator procedure prompting for startup of Experimental Breeder Reactor-2

    International Nuclear Information System (INIS)

    Renshaw, A.W.; Ball, S.J.; Ford, C.E.

    1990-11-01

    This report describes the development of an operator procedure prompting aid for startup of a nuclear reactor. This operator aid is a preliminary design for a similar aid that eventually will be used with the Advanced Liquid Metal Reactor (ALMR) presently in the design stage. Two approaches were used to develop this operator procedure prompting aid. One method uses an expert system software shell, and the other method uses database software. The preliminary requirements strongly pointed toward features traditionally associated with both database and expert systems software. Database software usually provides data manipulation flexibility and user interface tools, and expert systems tools offer sophisticated data representation and reasoning capabilities. Both methods, including software and associated hardware, are described in this report. Proposals for future enhancements to improve the expert system approach to procedure prompting and for developing other operator aids are also offered. 25 refs., 14 figs

  11. Automated operator procedure prompting for startup of Experimental Breeder Reactor-2

    Energy Technology Data Exchange (ETDEWEB)

    Renshaw, A.W.; Ball, S.J.; Ford, C.E.

    1990-11-01

    This report describes the development of an operator procedure prompting aid for startup of a nuclear reactor. This operator aid is a preliminary design for a similar aid that eventually will be used with the Advanced Liquid Metal Reactor (ALMR) presently in the design stage. Two approaches were used to develop this operator procedure prompting aid. One method uses an expert system software shell, and the other method uses database software. The preliminary requirements strongly pointed toward features traditionally associated with both database and expert systems software. Database software usually provides data manipulation flexibility and user interface tools, and expert systems tools offer sophisticated data representation and reasoning capabilities. Both methods, including software and associated hardware, are described in this report. Proposals for future enhancements to improve the expert system approach to procedure prompting and for developing other operator aids are also offered. 25 refs., 14 figs.

  12. A toolkit for computerized operating procedure of complex industrial systems with IVI-COM technology

    International Nuclear Information System (INIS)

    Zhou Yangping; Dong Yujie; Huang Xiaojing; Ye Jingliang; Yoshikawa, Hidekazu

    2013-01-01

    A human interface toolkit is proposed to help the user develop computerized operating procedure of complex industrial system such as Nuclear Power Plants (NPPs). Coupled with a friendly graphical interface, this integrated tool includes a database, a procedure editor and a procedure executor. A three layer hierarchy is adopted to express the complexity of operating procedure, which includes mission, process and node. There are 10 kinds of node: entrance, exit, hint, manual input, detector, actuator, data treatment, branch, judgment and plug-in. The computerized operating procedure will sense and actuate the actual industrial systems with the interface based on IVI-COM (Interchangeable Virtual Instrumentation-Component Object Model) technology. A prototype system of this human interface toolkit has been applied to develop a simple computerized operating procedure for a simulated NPP. (author)

  13. Development and application of emergency operating procedures for nuclear power plants

    International Nuclear Information System (INIS)

    Lin Chengge

    1990-01-01

    The development and application of emergency operating procedures (EOPs) is an important measure to assure the operational safety for nuclear power plants. Event-oriented, symptom-, function- and state-oriented EOPs with their structures, interfaces, development procedures and practical application are described. The ideas and approach can be available for the preparation of EOPs for nuclear power plants which are going to be in service

  14. Safe operation of research reactors and critical assemblies. Code of practice and annexes. 1984 ed

    International Nuclear Information System (INIS)

    1984-01-01

    The safe operation of research reactors and critical assemblies (hereafter termed 'reactors') requires proper design, construction, management and supervision. This Code of Practice deals mainly with management and supervision. The provisions of the Code apply to the whole life of the reactor, including modification, updating and upgrading. The Code may be subject to revision in the light of experience and the state of technology. The Code is aimed at defining minimum requirements for the safe operation of reactors. Emphasis is placed on which safety requirements should be met rather than on specifying how these requirements may be met. The Code also provides guidance and information to persons and authorities responsible for the operation of reactors. The Code recommends that documents dealing with the operation of reactors and including safety analyses be prepared and submitted for review and approval to a regulatory body. Operation would be authorized on the understanding that it would comply with limits and conditions designed to ensure safety. The Code covers a wide range of reactor types, which gives rise to a variety of safety issues. Safety issues applicable to specific reactor types only (e.g. fast reactors) are not necessarily covered in this Code. Some of the recommendations in the Code are not directly applicable to critical assemblies. A recommendation may therefore be interpreted according to the type of reactor concerned. In such cases the words 'adequate' and 'appropriate' are used to mean 'adequate' or 'appropriate' for the type of reactor under consideration.

  15. Selection of equipment for safe shutdown in the event of earthquake

    International Nuclear Information System (INIS)

    Romano Gomez, J.; Perez Alcaniz, T.; Esteban Barriendos, M.

    1993-01-01

    This paper presents the work carried out at the Almaraz Nuclear Power Plant for selecting equipment that contributes to reactor safe shutdown in the event of earthquake. The objective was to comply with the requirements defined by the US NRC in Generic Letter 87-02, 'Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors'. The analysis framework and the method applied followed the generic procedures prepared by the Seismic Qualification Utility Group of which Almaraz NPP is a member, along with other Spanish power plants. The equipment selected shall be subjected to the Application Programme of the above-mentioned Generic Letter. The aim has been to cover the objectives of the programme and, at the same time, to ensure compatibility with plant operating procedures. (author)

  16. What influences youth to operate all-terrain vehicles safely?

    Science.gov (United States)

    Grummon, A. H.; Heaney, C. A.; Dellinger, W. A.; Wilkins, J. R.

    2014-01-01

    The operation of all-terrain vehicles (ATVs) by youth has contributed to the incidence of serious and fatal injuries among children. This study explored factors related to the frequency with which youth wore a helmet and refrained from engaging in three risky driving behaviors (driving at risky speeds, on paved roads and on unfamiliar terrain) while operating an ATV. Youth (n = 248) aged 9–14 from central Ohio and one of their parents completed self-report measures of ATV safety behaviors, youth general propensity for risk taking, protection motivation and parental behaviors to facilitate youth safety. Data from two focus groups provided insight on quantitative results. Analyses revealed considerable variation in the frequency with which youth performed the safety behaviors, with 13- and 14-year-olds reporting less frequent safe behavior than 9- to 12-year-olds. Multiple regression analyses suggested that parental behaviors, such as providing reminders to wear a helmet, were associated with more frequent helmet use but were not associated with risky driving behaviors. Youth’s general propensity toward risk taking was not associated with helmet use and only associated with riskydriving behaviors among the 13- and 14-year-olds. Self-efficacy was an important predictor across both age groups and behaviors. Implications for injury prevention are discussed. PMID:24740837

  17. Minimally Invasive Catheter Procedures to Assist Complicated Pacemaker Lead Extraction and Implantation in the Operating Room

    International Nuclear Information System (INIS)

    Kröpil, Patric; Lanzman, Rotem S.; Miese, Falk R.; Blondin, Dirk; Winter, Joachim; Scherer, Axel; Fürst, Günter

    2011-01-01

    We report on percutaneous catheter procedures in the operating room (OR) to assist complicated manual extraction or insertion of pacemaker (PM) and implantable cardioverter defibrillator leads. We retrospectively reviewed complicated PM revisions and implantations performed between 2004 and 2009 that required percutaneous catheter procedures performed in the OR. The type of interventional procedure, catheter and retrieval system used, venous access, success rates, and procedural complications were analyzed. In 41 (12 female and 29 male [mean age 62 ± 17 years]) of 3021 (1.4%) patients, standard manual retrieval of old leads or insertion of new leads was not achievable and thus required percutaneous catheter intervention for retrieval of misplaced leads and/or recanalisation of occluded central veins. Thirteen of 18 (72.2%) catheter-guided retrieval procedures for misplaced (right atrium [RA] or ventricle [RV; n = 3], superior vena cava [n = 2], brachiocephalic vein [n = 5], and subclavian vein [n = 3]) lead fragments in 16 patients were successful. Percutaneous catheter retrieval failed in five patients because there were extremely fixed or adhered lead fragments. Percutaneous transluminal angiography (PTA) of central veins for occlusion or high-grade stenosis was performed in 25 patients. In 22 of 25 patients (88%), recanalization of central veins was successful, thus enabling subsequent lead replacement. Major periprocedural complications were not observed. In the case of complicated manual PM lead implantation or revision, percutaneous catheter-guided extraction of misplaced lead fragments or recanalisation of central veins can be performed safely in the OR, thus enabling subsequent implantation or revision of PM systems in the majority of patients.

  18. How to develop a Standard Operating Procedure for sorting unfixed cells

    Science.gov (United States)

    Schmid, Ingrid

    2012-01-01

    Written Standard Operating Procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. PMID:22381383

  19. How to develop a standard operating procedure for sorting unfixed cells.

    Science.gov (United States)

    Schmid, Ingrid

    2012-07-01

    Written standard operating procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. Copyright © 2012 Elsevier Inc. All rights reserved.

  20. Preliminary Investigation of Time Remaining Display on the Computer-based Emergency Operating Procedure

    Science.gov (United States)

    Suryono, T. J.; Gofuku, A.

    2018-02-01

    One of the important thing in the mitigation of accidents in nuclear power plant accidents is time management. The accidents should be resolved as soon as possible in order to prevent the core melting and the release of radioactive material to the environment. In this case, operators should follow the emergency operating procedure related with the accident, in step by step order and in allowable time. Nowadays, the advanced main control rooms are equipped with computer-based procedures (CBPs) which is make it easier for operators to do their tasks of monitoring and controlling the reactor. However, most of the CBPs do not include the time remaining display feature which informs operators of time available for them to execute procedure steps and warns them if the they reach the time limit. Furthermore, the feature will increase the awareness of operators about their current situation in the procedure. This paper investigates this issue. The simplified of emergency operating procedure (EOP) of steam generator tube rupture (SGTR) accident of PWR plant is applied. In addition, the sequence of actions on each step of the procedure is modelled using multilevel flow modelling (MFM) and influenced propagation rule. The prediction of action time on each step is acquired based on similar case accidents and the Support Vector Regression. The derived time will be processed and then displayed on a CBP user interface.

  1. Is the use of hemostatic matrix (Floseal and alkylene oxide copolymer (Ostene safe in spinal laminectomies? Peridural fibrosis assessment

    Directory of Open Access Journals (Sweden)

    Oktay Gurcan

    2017-03-01

    Conclusion: Reoperation as result of FBS has greater risk and often has poor outcome; surgeons must take precautions to avoid FBS, such as careful selection of appropriate patient and operation technique. Ostene and Floseal may be applied and left in the operation field safely during laminectomy to reduce occurrence of PF after procedure.

  2. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  3. Independent verification: operational phase liquid metal breeder reactors

    International Nuclear Information System (INIS)

    Bourne, P.B.

    1981-01-01

    The Fast Flux Test Facility (FFTF) recently achieved 100-percent power and now is in the initial stages of operation as a test reactor. An independent verification program has been established to assist in maintaining stable plant conditions, and to assure the safe operation of the reactor. Independent verification begins with the development of administrative procedures to control all other procedures and changes to the plant configurations. The technical content of the controlling procedures is subject to independent verification. The actual accomplishment of test procedures and operational maneuvers is witnessed by personnel not responsible for operating the plant. Off-normal events are analyzed, problem reports from other operating reactors are evaluated, and these results are used to improve on-line performance. Audits are used to confirm compliance with established practices and to identify areas where individual performance can be improved

  4. A cadaveric procedural anatomy simulation course improves video-based assessment of operative performance.

    Science.gov (United States)

    Sharma, Gaurav; Aycart, Mario A; O'Mara, Lynne; Havens, Joaquim; Nehs, Matthew; Shimizu, Naomi; Smink, Douglas S; Gravereaux, Edwin; Gates, Jonathan D; Askari, Reza

    2018-03-01

    Inadequate anatomic knowledge has been cited as a major contributor to declining surgical resident operative competence. We analyzed the impact of a comprehensive, procedurally oriented cadaveric procedural anatomy dissection laboratory on the operative performance of surgery residents, hypothesizing that trainees' performance of surgical procedures would improve after such a dissection course. Midlevel general surgery residents (n = 9) participated in an 8 wk, 16-h surgery faculty-led procedurally oriented cadaver simulation course. Both before and after completion of the course, residents participated in a practical examination, in which they were randomized to perform one of nine Surgical Council on Resident Education-designated "essential" procedures. The procedures were recorded using wearable video technology. Videos were deidentified before evaluation by six faculty raters blinded to examinee and whether performances occurred before or after an examinee had taken the course. Raters used the validated Operative Performance Rating System and Objective Structured Assessment of Technical Skill scales. After the course residents had higher procedure-specific scores (median, 4.0 versus 2.4, P 4.0 versus 3.0, P = 0.006), respect for tissue (4.0 versus 3.0, P = 0.0004), time and motion (3.0 versus 2.0, P = 0.0007), operation flow (3.0 versus 2.0, P = 0.0005), procedural knowledge (4.0 versus 2.0, P = 0.0001), and overall performance scores (4.0 versus 2.0, P < 0.0001). Operative Performance Rating System and Objective Structured Assessment of Technical Skill scales averaged by number of items in each were also higher (3.2 versus 2.0, P = 0.0002 and 3.1 versus 2.2, P = 0.002, respectively). A cadaveric procedural anatomy simulation course covering a broad range of open general surgery procedures was associated with significant improvements in trainees' operative performance. Copyright © 2017 Elsevier Inc. All rights reserved.

  5. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  6. Acquisition of Formal Operations: The Effects of Two Training Procedures.

    Science.gov (United States)

    Rosenthal, Doreen A.

    1979-01-01

    A study of 11- and 12-year-old girls indicates that either of two training procedures, method training or dimension training, can aid in the transition from concrete operational to formal operational thought by promoting a hypothesis-testing attitude. (BH)

  7. Automated Kick Control Procedure for an Influx in Managed Pressure Drilling Operations

    Directory of Open Access Journals (Sweden)

    Jing Zhou

    2016-01-01

    Full Text Available Within drilling of oil and gas wells, the Managed Pressure Drilling (MPD method with active control of wellbore pressure during drilling has partly evolved from conventional well control procedures. However, for MPD operations the instrumentation is typically more extensive compared to conventional drilling. Despite this, any influx of formation fluids (commonly known as a kick during MPD operations is typically handled by conventional well control methods, at least if the kick is estimated to be larger than a threshold value. Conventional well control procedures rely on manual control of the blow out preventer, pumps, and choke valves and do not capitalize on the benefits from the instrumentation level associated with MPD. This paper investigates two alternative well control procedures specially adapted to backpressure MPD: the dynamic shut-in (DSI procedure and the automatic kick control (AKC procedure. Both methods capitalize on improvements in Pressure While Drilling (PWD technology. A commercially available PWD tool buffers high-resolution pressure measurements, which can be used in an automated well control procedure. By using backpressure MPD, the choke valve opening is tuned automatically using a feedback-feedforward control method. The two procedures are evaluated using a high fidelity well flow model and cases from a North Sea drilling operation are simulated. The results show that using AKC procedure reduces the time needed to establish control of the well compared to DSI procedure. It also indicates that the AKC procedure reduces the total kick size compared to the DSI procedure, and thereby reduces the risk of lost circulation.

  8. Unsupervised laparoscopic appendicectomy by surgical trainees is safe and time-effective.

    Science.gov (United States)

    Wong, Kenneth; Duncan, Tristram; Pearson, Andrew

    2007-07-01

    Open appendicectomy is the traditional standard treatment for appendicitis. Laparoscopic appendicectomy is perceived as a procedure with greater potential for complications and longer operative times. This paper examines the hypothesis that unsupervised laparoscopic appendicectomy by surgical trainees is a safe and time-effective valid alternative. Medical records, operating theatre records and histopathology reports of all patients undergoing laparoscopic and open appendicectomy over a 15-month period in two hospitals within an area health service were retrospectively reviewed. Data were analysed to compare patient features, pathology findings, operative times, complications, readmissions and mortality between laparoscopic and open groups and between unsupervised surgical trainee operators versus consultant surgeon operators. A total of 143 laparoscopic and 222 open appendicectomies were reviewed. Unsupervised trainees performed 64% of the laparoscopic appendicectomies and 55% of the open appendicectomies. There were no significant differences in complication rates, readmissions, mortality and length of stay between laparoscopic and open appendicectomy groups or between trainee and consultant surgeon operators. Conversion rates (laparoscopic to open approach) were similar for trainees and consultants. Unsupervised senior surgical trainees did not take significantly longer to perform laparoscopic appendicectomy when compared to unsupervised trainee-performed open appendicectomy. Unsupervised laparoscopic appendicectomy by surgical trainees is safe and time-effective.

  9. Investigation on the Short Circuit Safe Operation Area of SiC MOSFET Power Modules

    DEFF Research Database (Denmark)

    Reigosa, Paula Diaz; Luo, Haoze; Iannuzzo, Francesco

    2016-01-01

    This paper gives a better insight of the short circuit capability of state-of-the-art SiC MOSFET power modules rated at 1.2 kV by highlighting the physical limits under different operating conditions. Two different failure mechanisms have been identified, both reducing the short-circuit capability...... of SiC power modules in respect to discrete SiC devices. Based on such failure mechanisms, two short circuit criteria (i.e., short circuit current-based criterion and gate voltage-based criterion) are proposed in order to ensure their robustness under short-circuit conditions. A Safe Operation Area (SOA...

  10. Extension of emergency operating procedures for severe accident management

    International Nuclear Information System (INIS)

    Chiang, S.C.

    1992-01-01

    To enhance the capability of reactor operators to cope with the hypothetical severe accident its the key issue for utilities. Taiwan Power Company has started the enhancement programs on extension of emergency operating procedures (EOPs). It includes the review of existing LOPs based on the conclusions and recommendations of probabilistic risk assessment studies to confirm the operator actions. Then the plant specific analysis for accident management strategy will be performed and the existing EOPs will be updated accordingly

  11. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  12. Risk of Venous Thromboembolism and Operative Duration in Patients Undergoing Neurosurgical Procedures.

    Science.gov (United States)

    Bekelis, Kimon; Labropoulos, Nicos; Coy, Shannon

    2017-05-01

    The association of operative duration with the risk of venous thromboembolism (VTE) has not been quantified in neurosurgery. To investigate the association of surgical duration for several neurosurgical procedures and the incidence of VTE. We performed a retrospective cohort study involving patients who underwent neurosurgical procedures from 2005 to 2012 and were registered in the American College of Surgeons National Quality Improvement Project registry. In order to control for confounding, we used multivariable regression models, and propensity score conditioning. During the study period, there were 94 747 patients, who underwent neurosurgical procedures, and met the inclusion criteria. Of these, 1358 (1.0%) developed VTE within 30 days postoperatively. Multivariable logistic regression demonstrated an association of longer operative duration with higher 30-day incidence of VTE (odds ratio [OR], 1.22; 95% confidence interval [CI], 1.19-1.25). Compared with procedures of moderate duration (third quintile, 40-60th percentile), patients undergoing the longest procedures (>80th percentile) had higher odds (OR, 3.15; 95% CI, 2.49-3.99) of developing VTE. The shortest procedures (<20th percentile) were associated with a decreased incidence of VTE (OR, 0.51; 95% CI, 0.27-0.76) in comparison to those of moderate duration. The same associations were present in propensity score-adjusted models, and models stratified by subgroups of cranial, spinal, peripheral nerve, and carotid procedures. In a cohort of patients from a national prospective surgical registry, increased operative duration was associated with increased incidence of VTE for neurosurgical procedures. These results can be used by neurosurgeons to inform operative management, and to stratify patients with regard to VTE risk. Copyright © 2016 by the Congress of Neurological Surgeons

  13. Topform '92: the safe and reliable operation of LWR NPPs. Vol. II

    International Nuclear Information System (INIS)

    1993-01-01

    Out of the 54 poster papers contained in the proceedings, 53 were inputted to the INIS system. The topics covered include operational training and simulation, inspection, maintenance and component replacement, backfitting experience, instrumentation, man-machine interface, software and procedures. (Z.S.)

  14. Early detection of power system disturbances as a condition for safe operation of the Dukovany NPP in the 'Island operation mode'

    International Nuclear Information System (INIS)

    Petruzela, I.

    1997-01-01

    The ''Frequency Plan'' worked out for the Czech Power System specifies a set of preventive measures along with the set of the frequency ranges. This problem was solved in details for the Dukovany nuclear power plant. The design changes under preparation support a reliable as well as safe operation in the island-operation mode until a full restoration of the whole power system. The design modifications are based on the following three main innovations: An incorporation of the FREA 16 frequency relay into the protection circuits; large modifications in turbine control loops; installation of software routine for the operator to support the island operation mode. The capability of the island operation has been demanded by relevant regulations both for the operating units and for that under construction. The capability can be tested under the transition to houseloads, as well as through the direct simulation of abnormal grid conditions. 1 fig

  15. The Role of Well Control Training in Developing Safe Onshore and Offshore Oil Drilling Operations

    Science.gov (United States)

    Abulhassn, Aber

    2016-01-01

    This research investigates the role of the International Well Control Forum (IWCF) Rotary Drilling Well Control Training Program in developing safe oil drilling operations from the perspective of onshore and offshore drilling crews. The research methodology is a qualitative case study. A total of 40 IWCF candidates were interviewed, with 10 from…

  16. [Handling modern imaging procedures in a high-tech operating room].

    Science.gov (United States)

    Hüfner, T; Citak, M; Imrecke, J; Krettek, C; Stübig, T

    2012-03-01

    Operating rooms are the central unit in the hospital network in trauma centers. In this area, high costs but also high revenues are generated. Modern operating theater concepts as an integrated model have been offered by different companies since the early 2000s. Our hypothesis is that integrative concepts for operating rooms, in addition to improved operating room ergonomics, have the potential for measurable time and cost savings. In our clinic, an integrated operating room concept (I-Suite, Stryker, Duisburg) was implemented after analysis of the problems. In addition to the ceiling-mounted arrangement, the system includes an endoscopy unit, a navigation system, and a voice control system. In the first 6 months (9/2005 to 2/2006), 112 procedures were performed in the integrated operating room: 34 total knee arthroplasties, 12 endoscopic spine surgeries, and 66 inpatient arthroscopic procedures (28 shoulder and 38 knee reconstructions). The analysis showed a daily saving of 22-45 min, corresponding to 15-30% of the daily changeover times, calculated to account for potential savings in the internal cost allocation of 225-450 EUR. A commercial operating room concept was evaluated in a pilot phase in terms of hard data, including time and cost factors. Besides the described effects further savings might be achieved through the effective use of voice control and the benefit of the sterile handle on the navigation camera, since waiting times for an additional nurse are minimized. The time of the procedure of intraoperative imaging is also reduced due to the ceiling-mounted concept, as the C-arm can be moved freely in the operating theater without hindering cables. By these measures and ensuing improved efficiency, the initial high costs for the implementation of the system may be cushioned over time.

  17. Evaluating North Carolina Food Pantry Food Safety-Related Operating Procedures.

    Science.gov (United States)

    Chaifetz, Ashley; Chapman, Benjamin

    2015-11-01

    Almost one in seven American households were food insecure in 2012, experiencing difficulty in providing enough food for all family members due to a lack of resources. Food pantries assist a food-insecure population through emergency food provision, but there is a paucity of information on the food safety-related operating procedures used in the pantries. Food pantries operate in a variable regulatory landscape; in some jurisdictions, they are treated equivalent to restaurants, while in others, they operate outside of inspection regimes. By using a mixed methods approach to catalog the standard operating procedures related to food in 105 food pantries from 12 North Carolina counties, we evaluated their potential impact on food safety. Data collected through interviews with pantry managers were supplemented with observed food safety practices scored against a modified version of the North Carolina Food Establishment Inspection Report. Pantries partnered with organized food bank networks were compared with those that operated independently. In this exploratory research, additional comparisons were examined for pantries in metropolitan areas versus nonmetropolitan areas and pantries with managers who had received food safety training versus managers who had not. The results provide a snapshot of how North Carolina food pantries operate and document risk mitigation strategies for foodborne illness for the vulnerable populations they serve. Data analysis reveals gaps in food safety knowledge and practice, indicating that pantries would benefit from more effective food safety training, especially focusing on formalizing risk management strategies. In addition, new tools, procedures, or policy interventions might improve information actualization by food pantry personnel.

  18. 49 CFR 195.402 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... operating conditions by monitoring pressure, temperature, flow or other appropriate operational data and...) Minimization of public exposure to injury and probability of accidental ignition by assisting with evacuation... SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance § 195.402 Procedural...

  19. Training manual for process operation and management of radioactive waste treatment facility

    Energy Technology Data Exchange (ETDEWEB)

    Shon, J. S.; Kim, K. J.; Ahn, S. J. [and others

    2004-12-01

    Radioactive Waste Treatment Facility (RWTF) has been operating for safe and effective treatment of radioactive wastes generated in the Korea Atomic Energy Research Institute (KAERI). In RWTF, there are evaporation, bituminization and solar evaporation processes for liquid waste, solid waste treatment process and laundry process. As other radioactive waste treatment facilities in foreign countries, the emergency situation such as fire and overflow of liquid waste can be taken place during the operation and result in the spread of contamination of radioactivity. So, easy and definite operating procedure is necessary for the safe operation of the facility. This manual can be available as easy and concise training materials for new employees and workers dispatched from service agency. Especially, in case of emergency urgently occurred during operation, everyone working in the facility can quickly stop the facility following this procedure.

  20. Training manual for process operation and management of radioactive waste treatment facility

    International Nuclear Information System (INIS)

    Shon, J. S.; Kim, K. J.; Ahn, S. J.

    2004-12-01

    Radioactive Waste Treatment Facility (RWTF) has been operating for safe and effective treatment of radioactive wastes generated in the Korea Atomic Energy Research Institute (KAERI). In RWTF, there are evaporation, bituminization and solar evaporation processes for liquid waste, solid waste treatment process and laundry process. As other radioactive waste treatment facilities in foreign countries, the emergency situation such as fire and overflow of liquid waste can be taken place during the operation and result in the spread of contamination of radioactivity. So, easy and definite operating procedure is necessary for the safe operation of the facility. This manual can be available as easy and concise training materials for new employees and workers dispatched from service agency. Especially, in case of emergency urgently occurred during operation, everyone working in the facility can quickly stop the facility following this procedure

  1. Topform '92: the safe and reliable operation of LWR NPPs. Vol. I

    International Nuclear Information System (INIS)

    1993-01-01

    The proceedings contain 23 invited plenary session papers. All have been inputted to INIS. The topics covered include safety principles, management and organization, operational training and simulation, inspection, maintenance and component replacement, backfitting experience, instrumentation, man-machine interface, software and procedures. (Z.S.)

  2. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  3. Load of Co-60 in large gamma irradiators: a safe proceeding

    International Nuclear Information System (INIS)

    Luca, Gilmara C.; Paquer, Daniela

    2011-01-01

    The inclusion of new Co-60 sources in industrial irradiators is an extra procedure to its operation and extremely critical. The operation requires planning, attention, responsibility and a well trained staff. Radiation level, package contamination and radioactive material escape evaluations are essential as measurement of pre-loading safety. The package transfer for the swimming pool i e the most critical moment of the operation. After sources transfer to the racks, it is necessary the monitoring of tools, package and sources through the scrubbing test. Notwithstanding to be a critical operation, the risk is minimized when it is performed according to safe rules and radiation protection, and in the process performed the individual accumulated doses does not exceed 50 to μSv

  4. Safe Energy Source in Battery-operated Toys for Children.

    Science.gov (United States)

    Rossi, Alfredo; Vignola, Silvia; Nason, Francesca; Boschetti, Federica; Bramerio, Manuela; Bailini, Alessandro; Pinarello, Giordano

    2017-11-01

    Serious and even fatal consequences of disk batteries ingestion in children are well known. Among other applications, disk batteries are used to power small toys, from which they can be unexpectedly extracted and swallowed. We tested a new cell intended for little toys (green cell [GC]), after 6 and 12 hours of in vitro close contact with esophageal swine mucosa. The GC was compared with lithium and silver button batteries under the same experimental conditions. Tissues in contact with the GC did not show pH variations nor histological alterations after 6 and 12 hours. In such conditions, statistically significant differences were found between the GC and the lithium and silver batteries. So far, multidisciplinary medical effort has been driven to both emergency approach and subsequent operative strategies in children with ingested batteries. Our trial demonstrates the possibility to primarily prevent battery-induced damages by designing new-generation safe cells with no tissue toxicity to power little toys intended for children.

  5. 42 CFR 35.15 - Consent to operative procedures.

    Science.gov (United States)

    2010-10-01

    ... emergencies when the patient is physically or mentally incapable of consenting and the delay required to... operative procedure shall be undertaken unless the patient or, in the case of a minor or incompetent, his... or refusal of consent shall be made a part of the clinical record. ...

  6. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Requirements for sanitation, facilities, and operating... Requirements for sanitation, facilities, and operating procedures in official plants. (a) The requirements for sanitation, facilities, and operating procedures in official plants shall be the applicable provisions stated...

  7. The Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) Off-Nominal Operations

    Science.gov (United States)

    Baxley, B.; Williams, D.; Consiglio, M.; Conway, S.; Adams, C.; Abbott, T.

    2005-01-01

    The ability to conduct concurrent, multiple aircraft operations in poor weather, at virtually any airport, offers an important opportunity for a significant increase in the rate of flight operations, a major improvement in passenger convenience, and the potential to foster growth of charter operations at small airports. The Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept is designed to increase traffic flow at any of the 3400 nonradar, non-towered airports in the United States where operations are currently restricted to one-in/one-out procedural separation during Instrument Meteorological Conditions (IMC). The concept's key feature is pilots maintain their own separation from other aircraft using procedures, aircraft flight data sent via air-to-air datalink, cockpit displays, and on-board software. This is done within the Self-Controlled Area (SCA), an area of flight operations established during poor visibility or low ceilings around an airport without Air Traffic Control (ATC) services. The research described in this paper expands the HVO concept to include most off-nominal situations that could be expected to occur in a future SATS environment. The situations were categorized into routine off-nominal operations, procedural deviations, equipment malfunctions, and aircraft emergencies. The combination of normal and off-nominal HVO procedures provides evidence for an operational concept that is safe, requires little ground infrastructure, and enables concurrent flight operations in poor weather.

  8. The design of operating procedures manuals for nuclear power plants

    International Nuclear Information System (INIS)

    Bohr, E.; Preuss, W.; Reinartz, G.; Thau, G.

    1977-03-01

    This report describes the findings of a research on the desirable design of operating procedures manuals for nuclear power plants. The work was supported by a grant of the Federal Department of the Interior. Information was acquired from different sources. Interviews and discussions on manual design were carried out with manual users in nuclear power plants. Moreover, tasks carried out using procedures were either observed or, alternatively, the manner of using procedures was elicited by interviews. In addition, manual writers, managers from manufacturers and utilities, nuclear experts, and individuals involved in manual specification activities were interviewed. A major source of information has been the pertinent scientific and technical findings scattered in the literature on topics such as instructional technology, engineering psychology, psycholinguistics, and typography. A comprehensive bibliography is included. General rules are established on designing instructional material for use on the job, aiming at increasing their legability, comprehensibility, and suitability to guide human performance. The application of these rules to the design of individual operating procedures is demonstrated. Recommendations are given on the design, layout, development and implementation of manuals. (orig.) [de

  9. Dynamic operator actions analysis for inherently safe fast reactors and light water reactors

    International Nuclear Information System (INIS)

    Ho, V.; Apostolakis, G.

    1988-01-01

    A comparative dynamic human actions analysis of inherently safe fast reactors (ISFRs) and light water reactors (LWRs) in terms of systems response and estimated human error rates is presented. Brief overviews of the ISFR and LWR systems are given to illustrate the design differences. Key operator actions required by the ISFR reactor shutdown and decay heat removal systems are identified and are compared with those of the LWR. It is observed that, because of the passive nature of the ISFR safety-related systems, a large time window is available for operator actions during transient events. Furthermore, these actions are fewer in number, are less complex, and have lower error rates and less severe consequences than those of the LWRs. We expect the ISFR operator errors' contribution to risk is smaller (at least in the context of the existing human reliability models) than that of the LWRs. (author)

  10. The Pajarito Site operating procedures for the Los Alamos Critical Experiments Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1991-12-01

    Operating procedures consistent with DOE Order 5480.6, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Los Alamos Critical Experiments Facility (LACEF) of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1983 and apply to any criticality experiment performed at the facility. 11 refs

  11. A study for Unsafe Act classification under crew interaction during procedure-driven operation

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Park, Jinkyun; Kim, Yochan; Kim, Seunghwan; Jung, Wondea

    2016-01-01

    Highlights: • The procedure driven operation was divided into four stages by considering the crew relations such as instructions and responses. • Ten patterns of UA occurrence paths and the related operators per path were identified. • The UA type classification scheme was proposed based on the ten patterns of UA occurrence paths. • A case study to implement the UA type classification and to define the related operators per UA was performed. • The UA type classification scheme can be practical in that it prevents bias by subjective judgment. - Abstract: In this study, a method for UA (Unsafe Act) classification under a simulated procedure driven operation was proposed. To this end, a procedure driven operation was divided into four stages by considering the crew relations such as instructions and responses. Based on the four stages of a procedure driven operation, ten patterns of UA occurrence paths and the related operators per path were identified. From the ten types of UA occurrence paths including related operators, it is practicable to trace when and by whom a UA is initiated during a procedure driven operation, and the interaction or causality among the crew after the UA is initiated. Therefore, the types of UAs were classified into ‘Instruction UA’, ‘Reporting UA’, and ‘Execution UA’ by considering the initiation time and initiator of UA. A case study to implement the UA type classification and to define the related operators per UA was performed with the ISLOCA scenario simulator training data. The UA classification scheme proposed in this paper can be practical in that it does not require expertise relatively in a human performance analysis and it prevents bias by subjective judgment because it is based on an observation-based approach to exclude subjective judgment.

  12. Development of automated operating procedure system using fuzzy colored petri nets for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Seong, Poong Hyun

    2004-01-01

    In this work, AuTomated Operating Procedure System (ATOPS) is developed. ATOPS is an automation system for emergency operation of a nuclear power plant (NPP) and it can monitor signals, diagnose statuses, and generate control actions according to corresponding operating procedures without any human operator's help. Main functions of ATOPS are an anomaly detection function and a procedure execution function but only the procedure execution function is implemented in this work because this work is just the first step. In the procedure execution function, operating procedures of NPPs are analyzed and modeled using Fuzzy Colored Petri Nets (FCPN) and executed depending on decision making of the inference engine. In this work, ATOPS prototype is developed to demonstrate its feasibility and it is also validated using the FISA-2/WS simulator. The validation is performed for the cases of a loss of coolant accident (LOCA) and a steam generator tube rupture (SGTR). The simulation results show that ATOPS works correctly in the emergency situations

  13. Human factoring administrative procedures

    International Nuclear Information System (INIS)

    Grider, D.A.; Sturdivant, M.H.

    1991-01-01

    In nonnuclear business, administrative procedures bring to mind such mundane topics as filing correspondence and scheduling vacation time. In the nuclear industry, on the other hand, administrative procedures play a vital role in assuring the safe operation of a facility. For some time now, industry focus has been on improving technical procedures. Significant efforts are under way to produce technical procedure requires that a validated technical, regulatory, and administrative basis be developed and that the technical process be established for each procedure. Producing usable technical procedures requires that procedure presentation be engineered to the same human factors principles used in control room design. The vital safety role of administrative procedures requires that they be just as sound, just a rigorously formulated, and documented as technical procedures. Procedure programs at the Tennessee Valley Authority and at Boston Edison's Pilgrim Station demonstrate that human factors engineering techniques can be applied effectively to technical procedures. With a few modifications, those same techniques can be used to produce more effective administrative procedures. Efforts are under way at the US Department of Energy Nuclear Weapons Complex and at some utilities (Boston Edison, for instance) to apply human factors engineering to administrative procedures: The techniques being adapted include the following

  14. Conceptual design report for tank farm restoration and safe operations, project W-314

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  15. The End-To-End Safety Verification Process Implemented to Ensure Safe Operations of the Columbus Research Module

    Science.gov (United States)

    Arndt, J.; Kreimer, J.

    2010-09-01

    The European Space Laboratory COLUMBUS was launched in February 2008 with NASA Space Shuttle Atlantis. Since successful docking and activation this manned laboratory forms part of the International Space Station(ISS). Depending on the objectives of the Mission Increments the on-orbit configuration of the COLUMBUS Module varies with each increment. This paper describes the end-to-end verification which has been implemented to ensure safe operations under the condition of a changing on-orbit configuration. That verification process has to cover not only the configuration changes as foreseen by the Mission Increment planning but also those configuration changes on short notice which become necessary due to near real-time requests initiated by crew or Flight Control, and changes - most challenging since unpredictable - due to on-orbit anomalies. Subject of the safety verification is on one hand the on orbit configuration itself including the hardware and software products, on the other hand the related Ground facilities needed for commanding of and communication to the on-orbit System. But also the operational products, e.g. the procedures prepared for crew and ground control in accordance to increment planning, are subject of the overall safety verification. In order to analyse the on-orbit configuration for potential hazards and to verify the implementation of the related Safety required hazard controls, a hierarchical approach is applied. The key element of the analytical safety integration of the whole COLUMBUS Payload Complement including hardware owned by International Partners is the Integrated Experiment Hazard Assessment(IEHA). The IEHA especially identifies those hazardous scenarios which could potentially arise through physical and operational interaction of experiments. A major challenge is the implementation of a Safety process which owns quite some rigidity in order to provide reliable verification of on-board Safety and which likewise provides enough

  16. Situation awareness and trust in computer-based procedures in nuclear power plant operations

    Energy Technology Data Exchange (ETDEWEB)

    Throneburg, E. B.; Jones, J. M. [AREVA NP Inc., 7207 IBM Drive, Charlotte, NC 28262 (United States)

    2006-07-01

    Situation awareness and trust are two issues that need to be addressed in the design of computer-based procedures for nuclear power plants. Situation awareness, in relation to computer-based procedures, concerns the operators' knowledge of the plant's state while following the procedures. Trust concerns the amount of faith that the operators put into the automated procedures, which can affect situation awareness. This paper first discusses the advantages and disadvantages of computer-based procedures. It then discusses the known aspects of situation awareness and trust as applied to computer-based procedures in nuclear power plants. An outline of a proposed experiment is then presented that includes methods of measuring situation awareness and trust so that these aspects can be analyzed for further study. (authors)

  17. Situation awareness and trust in computer-based procedures in nuclear power plant operations

    International Nuclear Information System (INIS)

    Throneburg, E. B.; Jones, J. M.

    2006-01-01

    Situation awareness and trust are two issues that need to be addressed in the design of computer-based procedures for nuclear power plants. Situation awareness, in relation to computer-based procedures, concerns the operators' knowledge of the plant's state while following the procedures. Trust concerns the amount of faith that the operators put into the automated procedures, which can affect situation awareness. This paper first discusses the advantages and disadvantages of computer-based procedures. It then discusses the known aspects of situation awareness and trust as applied to computer-based procedures in nuclear power plants. An outline of a proposed experiment is then presented that includes methods of measuring situation awareness and trust so that these aspects can be analyzed for further study. (authors)

  18. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  19. Safe operation of existing radioactive waste management facilities at Dalat Nuclear Research Institute

    International Nuclear Information System (INIS)

    Pham Van Lam; Ong Van Ngoc; Nguyen Thi Nang

    2000-01-01

    The Dalat Nuclear Research Reactor was reconstructed from the former TRIGA MARK-II in 1982 and put into operation in March 1984. The combined technology for radioactive waste management was newly designed and put into operation in 1984. The system for radioactive waste management at the Dalat Nuclear Research Institute (DNRI) consists of radioactive liquid waste treatment station and disposal facilities. The treatment methods used for radioactive liquid waste are coagulation and precipitation, mechanical filtering and ion- exchange. Near-surface disposal of radioactive wastes is practiced at DNRI In the disposal facilities eight concrete pits are constructed for solidification and disposal of low level radioactive waste. Many types of waste generated in DNRI and in some Nuclear Medicine Departments in the South of Vietnam are stored in the disposal facilities. The solidification of sludge has been done by cementation. Hydraulic compactor has done volume reduction of compatible waste. This paper presents fifteen-years of safe operation of radioactive waste management facilities at DNRI. (author)

  20. Proposal for a new normalization reference in LCA based on “safe operating space”: presentation of framework and global factors at midpoint level

    DEFF Research Database (Denmark)

    Bjørn, Anders; Hauschild, Michael Zwicky

    Planetary boundaries have been suggested for a range of environmental impacts,such as climate change, eutrophying nutrients and land use. The boundaries demarcate the safe operating space of humanity: Staying within the space ensures environmental sustainability, while exceeding it risks pushing...... ecosystems into alternative regimes, leading to adverse effects for humanity. Planetary boundaries can be applied as policy targets. To promote a societal development in the direction of these targets, an indicator system is needed that measures the fraction of the safe operating space that a given activity...... normalization factors in units compatible with characterized results at midpoint level in LCA. Our suggested framework allows expressing normalized results in units of “sustainable person years”. Normalization factors are derived by dividing the safe operating space by the global population. The proposed...

  1. Modification / procedural changes adopted for safe and smooth operation of Heavy Water Plant, Hazira for maximising productivity and resulting in energy conservation (Paper No. 6.6)

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The Heavy Water Plant at Hazira is based on monothermal ammonia-hydrogen exchange process. The plant is built in two stream for isotopic exchange and enrichment with common facilities for interconnections with fertilizer plant, synthesis unit, amide preparation, utilities and final product, identical to HWP, Thal unit. This plant is built after incorporating some of the improvement effected from operating experiences gained from Baroda, Tuticorin and Thal plants. Plant erection was completed without a single casualty/mishap well within the time schedule and commissioning was completed within six months from charging of synthesis gas and ammonia in the plant. A few modifications of minor/major nature have been incorporated both in the design and during the course of operation. Some procedural changes have also been adopted for flexibility of operation, improved productivity and energy conservation. (author). 2 figs

  2. 49 CFR Appendix E to Part 240 - Recommended Procedures for Conducting Skill Performance Tests

    Science.gov (United States)

    2010-10-01

    ... tailor their testing procedures to the specific operational realities. This appendix contains FRA's..., headlight? —Couple to cars at a safe speed? —Properly control in train slack and buff forces? —Properly use...

  3. Pelvic denervation procedures for dysmenorrhea.

    Science.gov (United States)

    Ramirez, Christina; Donnellan, Nicole

    2017-08-01

    Chronic pelvic pain and dysmenorrhea are common conditions affecting reproductive-age women. Surgical pelvic denervation procedures may be a treatment option for women with midline dysmenorrhea, in which medical management is declined by the patient, ineffective at managing symptoms, or medically contraindicated. This review describes the surgical techniques and complications associated with pelvic denervation procedures as well as the current evidence for these procedures in women with primary dysmenorrhea and dysmenorrhea secondary to endometriosis. Presacral neurectomy is the preferred pelvic denervation procedure in patients with primary dysmenorrhea and midline chronic pelvic pain associated with endometriosis. In patients with endometriosis presacral neurectomy is a useful adjunct to excision or ablation of all endometrial lesions to improve postoperative pain relief. There is no additional patient benefit of performing combined presacral neurectomy and uterine nerve ablation procedures. Pelvic denervation procedures can be performed safely and quickly with a low risk of complication if the surgeon is knowledgeable and skilled in operating in the presacral space. Patients should be adequately counseled on expected success rates and potential complications associated with pelvic denervation procedures.

  4. Symptom-based emergency operating procedures development for Ignalina NPP

    International Nuclear Information System (INIS)

    Kruglov, Y.

    1999-01-01

    In this paper and lecture are presented: (1) Introduction; (2) EOP project work stages and documentation; (3) Selection and justification of accident management strategy; (4) Content of EOP package; (5) Development of EOP package; (6) EOP package verification; (7) EOP package validation; (8) EOP training; (9) EOP implementation; (10) Conditions of symptom-based emergency operating producers package application and its interconnection with event-based emergency operating procedures; (11) Rules of EOP application; EOP maintenance

  5. Developments in the preparation of operating procedures for emergency conditions of nuclear power plants

    International Nuclear Information System (INIS)

    1985-06-01

    In recent years a substantial effort has been devoted by the nuclear community to extend Emergency Operating Procedures (EOPs) to cover all conceivable events and to develop procedure formats that transmit the essential guidance to operators in an optimum way. The information given in this report is based upon the most recent developments in formulating and applying EOPs. It should therefore provide guidance to those involved in preparing or reviewing EOPs on the scope, technical basis, organization and format of such procedures. It also outlines the actions required to validate the adequacy and applicability of these procedures so that the correct operator actions are achieved. Examples are given to illustrate the developments in some Member States

  6. The use of flow models for design of plant operating procedures

    International Nuclear Information System (INIS)

    Lind, M.

    1982-03-01

    The report describe a systematic approach to the design of operating procedures or sequence automatics for process plant control. It is shown how flow models representing the topology of mass and energy flows on different levels of function provide plant information which is important for the considered design problem. The modelling methodology leads to the definition of three categories of control tasks. Two tasks relate to the regulation and control of changes of levels and flows of mass and energy in a system within a defined mode of operation. The third type relate to the control actions necessary for switching operations involved in changes of operating mode. These control tasks are identified for a given plant as part of the flow modelling activity. It is discussed how the flow model deal with the problem of assigning control task precedence in time eg. during start-up or shut-down operations. The method may be a basis for providing automated procedure support to the operator in unforeseen situations or may be a tool for control design. (auth.)

  7. Twenty years of health physics research reactor operation

    International Nuclear Information System (INIS)

    Sims, C.S.; Gilley, L.W.

    1983-01-01

    The Health Physics Research Reactor at the Oak Ridge National Laboratory has been in regular use for more than two decades. Safe operation of this fast reactor over this extended period indicates that (1) fundamental design, (2) operational procedures, (3) operator training and performance, (4) maintenance activites, and (5) management have all been eminently satisfactory. The reactor and its uses are described, the operational history and significant events are reviewed, and operational improvements and maintenance are discussed

  8. Comparison of the effect of paper and computerized procedures on operator error rate and speed of performance

    International Nuclear Information System (INIS)

    Converse, S.A.; Perez, P.B.; Meyer, S.; Crabtree, W.

    1994-01-01

    The Computerized Procedures Manual (COPMA-II) is an advanced procedure manual that can be used to select and execute procedures, to monitor the state of plant parameters, and to help operators track their progress through plant procedures. COPMA-II was evaluated in a study that compared the speed and accuracy of operators' performance when they performed with COPMA-II and traditional paper procedures. Sixteen licensed reactor operators worked in teams of two to operate the Scales Pressurized Water Reactor Facility at North Carolina State University. Each team performed one change of power with each type of procedure to simulate performance under normal operating conditions. Teams then performed one accident scenario with COPMA-II and one with paper procedures. Error rates, performance times, and subjective estimates of workload were collected, and were evaluated for each combination of procedure type and scenario type. For the change of power task, accuracy and response time were not different for COPMA-II and paper procedures. Operators did initiate responses to both accident scenarios fastest with paper procedures. However, procedure type did not moderate response completion time for either accident scenario. For accuracy, performance with paper procedures resulted in twice as many errors as did performance with COPMA-II. Subjective measures of mental workload for the accident scenarios were not affected by procedure type

  9. EVALUASI SANITATION STANDARD OPERATING PROCEDURES KERUPUKAMPLANG DI UD SARINA KECAMATAN KALIANGET KABUPATEN SUMENEP

    Directory of Open Access Journals (Sweden)

    Ach Triharjono

    2016-11-01

    Full Text Available Industri pangan untuk menghasilkan produk yang memenuhi standar keamanan pangan. Standar tersebut dapat dipenuhi dengan menerapkan 8 aspek kunci Sanitation Standard Operating Prosedures (SSOP. Tujuan dari penelitian ini adalah untuk memperoleh hasil penerapan 8 aspek kunci Sanitation Standard Operating Procedures (SSOP dan mengevaluasi penerapan Sanitation Standard Operating Procedures (SSOP Di UD Sarina Kecamatan Kalianget Kabupaten Sumenep. Jenis penelitian ini bersifat deskriptif dengan lokasi penelitian di UD Sarina Kecamatan Kalianget Kabupaten Sumenep. Hasil penelitian diketahui bahwa penerapan 8 aspek kunci Sanitation Standard Operating Procedures (SSOP di UD Sarina sudah terlaksana tapi terdapat 3 tahapan kunci yang belum terlaksana dengan baik yaitu pencegahan kontaminasi silang, pengawasan kondisi kesehatan personil dan menghilangkan hama dari unit pengolahan. Hal yang perlu ditingkatkan terkait dengan penerapan SSOP di UD Sarina yaitu masih perlu adanya manual prosedur untuk berbagai pelaksanaan sanitasi yang dilakukan oleh UD Sarina ini

  10. How to operate safely steam generators with multiple tube through-wall defects

    International Nuclear Information System (INIS)

    Hernalsteen, P.

    1993-01-01

    For a Nuclear Power Plant (NPP) of the Pressurized Water Reactor (PWR) type, the Steam Generator (SG) tube bundle represents the major but also the thinnest part of the primary pressure boundary. To the extent that no tube material has yet been identified to be immune to corrosion, defects may initiate in service and easily propagate through wall. While not a desirable feature, a Through Wall Deep (TWD) defect does not necessarily pose a threat to either the structural integrity or leaktightness and this paper shows how SG can (and indeed, do) operate safely and reliably while having many tubes affected by deep and even TWD defects

  11. Operational test procedure for Bldg 241-A-701 air compressor

    International Nuclear Information System (INIS)

    Desantis, G.N.

    1995-01-01

    This document is an Operability Test Procedure (OTP) which will verify and record that the 241-A-701 air compressor and associated equipment operates within their intended design parameters. The activities defined in this OTP will be performed to ensure the daily operation of the new compressed air system can be reliable and efficient. The Compressed Air System (CAS) for 241-A-701 supplies process and instrument air to the A, AX, AY, and AZ tank farms. The primary use of the CAS is for tank farms instrumentation, air operated valves, and air lift circulators

  12. Methods for implementing revisions to emergency operating procedures. Final report

    International Nuclear Information System (INIS)

    Myers, L.B.; Bell, A.J.

    1984-05-01

    In response to the Three Mile Island (TMI) accident, the US Nuclear Regulatory Commission (NRC) has published the TMI Action Plan. The TMI Action Plan Item I.C.1 called for the upgrading of Emergency Operating Procedures (EOPs) at nuclear power plants. The program developed from this Action Plan item has resulted in utility efforts to: (1) revise EOPs; (2) train personnel in the use of the EOPs; and (3) implement the revised EOPs. The NRC supported the study presented in this report to identify factors which influence the effectiveness of training and implementation of revised EOPs. The NRC's major concern was the possible effects of negative transfer of training. The report includes a summary of existing methods for implementing revisions to procedures based on interviews of plant personnel, a review of the training literature applicable to the effect of previously learned procedures on the learning of and performance with revised procedures (i.e., negative transfer) and recommendations of methods and schedules for implementing revised EOPs. While the study found that the concern over negative transfer of training was not as great as anticipated, several recommendations were made. These include: (1) overtraining of operators to reduce the effect of observed negative transfer; and (2) implementation of the revised EOPs as soon as possible after training to minimize the time operators must rely upon the old EOPs after having been trained on the revised EOPs. The results of the study should be useful both to the utilities and the NRC in the development and review of EOP implementation programs

  13. Project W-320, WRSS PCP: Procedure implementation verification

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the methodology for the safe retrieval of high-heat waste from Tank 241-C-106 as specified in the WRSS Process Control Plan HNF-SD-PCP-013, Revision 1, has been adequately implemented into the Tank Waste Remediation System (TWRS) operational procedures. Tank 241-C-106 is listed on the High Heat Load Watch List

  14. SAFE/SNAP application to shipboard security

    International Nuclear Information System (INIS)

    Grady, L.M.; Walker, J.L.; Polito, J.

    1981-11-01

    An application of the combined Safeguards Automated Facility Evaluation/Safeguards Network Analysis Procedure (SAFE/SNAP) modeling technique to a physical protection system (PPS) aboard a generic ship is described. This application was performed as an example of how the SAFE and SNAP techniques could be used. Estimates of probability of interruption and neutralization for the example shipboard PPS are provided by SAFE as well as an adversary scenario, which serves as input to SNAP. This adversary scenario is analyzed by SNAP through four cases which incorporate increasingly detailed security force tactics. Comparisons between the results of the SAFE and SNAP analyses are made and conclusions drawn on the validity of each technique. Feedback from SNAP to SAFE is described, and recommendations for upgrading the ship based on the results of the SAFE/SNAP application are also discussed

  15. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    Energy Technology Data Exchange (ETDEWEB)

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  16. The Safety Prevention in the Theater Management and Operation

    Institute of Scientific and Technical Information of China (English)

    WU Sheng

    2015-01-01

    Take the operation and management experience as examples, the author discussed how to formulate a set of complete and effective equipment management system, operating rules, procedures and standards, as well as the safety prevention and control measures, according to the national or trade related laws and regulations and combining the operation and performance characteristics of theatre management, in order to ensure the safe operation of theatre and stage equipment.

  17. Development of an automated operating procedure system using fuzzy colored petri nets for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Seong, Poong Hyun

    2002-01-01

    In this work, AuTomated Operating Procedure System (ATOPS) is developed. ATOPS is an automation system for operation of a nuclear power plant (NPP) which can monitor signals, diagnose statuses, and generate control actions according to corresponding operating procedures, without any human operator's help. Main functions of ATOPS are anomaly detection function and procedure execution function, but only the procedure execution function is implemented because this work is just the first step. In the procedure execution function, operating procedures of NPP are analyzed and modeled using Fuzzy Colored Petri Nets (FCPN), and executed depending on decision making of the inference engine. In this work, an ATOPS prototype is developed in order to demonstrate its feasibility and it is also validated using FISA-2/WS simulator. The validation is performed for the cases of a loss of coolant accident (LOCA) and a steam generator tube rupture (SGTR). The simulation results show that ATOPS works correctly in the emergency situations

  18. 25 CFR 700.55 - Decent, safe, and sanitary dwelling.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Decent, safe, and sanitary dwelling. 700.55 Section 700... PROCEDURES General Policies and Instructions Definitions § 700.55 Decent, safe, and sanitary dwelling. (a) General. The term decent, safe, and sanitary dwelling means a dwelling which— (1) Meets applicable federal...

  19. 46th Annual meeting on nuclear technology (AMNT 2015). Key topic / Enhanced safety and operation excellence / Sustainable reactor operation management - safe, efficient, valuable

    International Nuclear Information System (INIS)

    Fischer, Erwin

    2015-01-01

    Summary report on the following Topical Session of the 46 th Annual Conference on Nuclear Technology (AMNT 2015) held in Berlin, 5 to 7 May 2015: - Sustainable Reactor Operation Management - Safe, Efficient, Valuable (Erwin Fischer) The other Sessions of the Key Topics - ''Outstanding Know-How and Sustainable Innovations'', - ''Enhanced Safety and Operation Excellence'' and - ''Decommissioning Experience and Waste Management Solutions'' have been covered in atw 7 (2015) and will be covered in further issues of atw.

  20. 50 CFR 260.103 - Operations and operating procedures shall be in accordance with an effective sanitation program.

    Science.gov (United States)

    2010-10-01

    ... be in accordance with an effective sanitation program. 260.103 Section 260.103 Wildlife and Fisheries... Operations and operating procedures shall be in accordance with an effective sanitation program. (a) All..., choppers, and containers which fail to meet appropriate and adequate sanitation requirements will be...

  1. Oral Surgical Procedures Performed Safely in Patients With Head and Neck Arteriovenous Malformations: A Retrospective Case Series of 12 Patients.

    Science.gov (United States)

    Karim, Abdul Basit; Lindsey, Sean; Bovino, Brian; Berenstein, Alejandro

    2016-02-01

    This case series describes patients with head and neck arteriovenous malformations who underwent oral and maxillofacial surgical procedures combined with interventional radiology techniques to minimize blood loss. Twelve patients underwent femoral cerebral angiography to visualize the extent of vascular malformation. Before the surgical procedures, surgical sites were devascularized by direct injection of hemostatic or embolic agents. Direct puncture sclerotherapy at the base of surgical sites was performed using Surgiflo or n-butylcyanoacrylate glue. Surgical procedures were carried out in routine fashion. A hemostatic packing of FloSeal, Gelfoam, and Avitene was adapted to the surgical sites. Direct puncture sclerotherapy with Surgiflo or n-butylcyanoacrylate glue resulted in minimal blood loss intraoperatively. Local application of the FloSeal, Gelfoam, and Avitene packing sustained hemostasis and produced excellent healing postoperatively. Patients with arteriovenous malformations can safely undergo routine oral and maxillofacial surgical procedures with minimal blood loss when appropriate endovascular techniques and local hemostatic measures are used by the interventional radiologist and oral and maxillofacial surgeon. Copyright © 2016 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  2. Safety management procedures and practices at Indira Gandhi Centre for Atomic Research

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, P.; Lee, S.M.; Kapoor, R.P.; Raghunath, V.M.; Karthikeyan, S.V. [Indira Gandhi Centre for Atomic Research, Kalpakkam 603 102 (India)]. E-mail: kapoor@igcar.ernet.in

    2004-07-01

    The Indira Gandhi Centre for Atomic Research (IGCAR) operates FBTR (Fast Breeder Test Reactor), KAMINI (neutron source reactor), radiometallurgical laboratory, radiochemical laboratory, reprocessing plant, industrial scale sodium loops, advanced research laboratories, workshops, etc. Codified safety management procedures with systematic surveillance are essential for safe and reliable operations and these are described under the classifications of radiation safety, industrial safety and reactor operations with special emphasis on the human factor. Health physics teams, independent of the plant facility, supervise the radioactive facilities of the centre. Industrial safety standards are maintained by another independent section. Safety management for the reactors include a clear organisational structure, adequate documentation, compulsory training and licencing, safe working methods taking into account human factors and review by independent safety authorities. (author)

  3. Safety management procedures and practices at Indira Gandhi Centre for Atomic Research

    International Nuclear Information System (INIS)

    Rodriguez, P.; Lee, S.M.; Kapoor, R.P.; Raghunath, V.M.; Karthikeyan, S.V.

    2004-01-01

    The Indira Gandhi Centre for Atomic Research (IGCAR) operates FBTR (Fast Breeder Test Reactor), KAMINI (neutron source reactor), radiometallurgical laboratory, radiochemical laboratory, reprocessing plant, industrial scale sodium loops, advanced research laboratories, workshops, etc. Codified safety management procedures with systematic surveillance are essential for safe and reliable operations and these are described under the classifications of radiation safety, industrial safety and reactor operations with special emphasis on the human factor. Health physics teams, independent of the plant facility, supervise the radioactive facilities of the centre. Industrial safety standards are maintained by another independent section. Safety management for the reactors include a clear organisational structure, adequate documentation, compulsory training and licencing, safe working methods taking into account human factors and review by independent safety authorities. (author)

  4. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  5. Contribution of the ergonomic analysis to the improvement of the design of operating procedures in nuclear power plants

    International Nuclear Information System (INIS)

    Dien, Y.; Montmayeul, R.

    1992-11-01

    The design of operating procedures for continuous processes is much too often based on implicit assumptions both concerning the operators and the operating conditions that must be dealt with. The merit of the ergonomic approach to the design of procedures is to take account of the way the various operators actually use operating procedures. The actual use is determined from the analysis of on-site operation (normal and incident operating conditions) and the analysis of full-scale simulators tests (incident operating conditions). The introduction of the ergonomic approach in the procedure design results in new design principles being proposed

  6. Operative vaginal delivery and invasive procedures in pregnancy among women living with HIV.

    Science.gov (United States)

    Peters, Helen; Francis, Kate; Harding, Kate; Tookey, Pat A; Thorne, Claire

    2017-03-01

    To describe the use and outcomes of operative delivery and invasive procedures in pregnancy amongst women living with HIV. The National Study of HIV in Pregnancy and Childhood (NSHPC) is a comprehensive population-based surveillance study in the UK and Ireland. The NSHPC has collected data on operative delivery since 2008, and invasive procedures in pregnancy (amniocentesis, cordocentesis, chorionic villus sampling) from 2012. Descriptive analyses were conducted on 278 pregnancies expected to deliver from 1 January 2008 with outcome reported to the NSHPC by 31 March 2016. Among 9372 pregnancies in 2008-2016, there were 9072 livebirths with 251 operative deliveries and 27 invasive procedures in pregnancy reported. Information was available for 3023/3490 vaginal deliveries, and use of forceps or vacuum reported in 251deliveries (8.2%), increasing over calendar time to almost 10% by 2014-16. Forceps were used twice as often as vacuum delivery, and forceps use increased over time. One infant delivered operatively is known to have acquired HIV. From 2012 there were 4063 pregnancies resulting in 3952 livebirths, 83 terminations and 28 stillbirths. 2163/4063 had information on use (or not) of invasive procedures in pregnancy. Amniocentesis was reported in 25/2163 pregnancies, there was one report of chorionic villus sampling and one of cordocentesis. There were no reported transmissions following invasive procedures in pregnancy. This is the largest study to date to report on operative delivery in women living with HIV on combined antiretroviral therapy (cART), and provides an up-to-date picture of invasive procedures during pregnancy in this group. Findings from this comprehensive national study are reassuring but numbers are currently low; on-going monitoring is crucial as obstetric care of women with HIV becomes normalised. Copyright © 2017 Elsevier B.V. All rights reserved.

  7. VISIR: technological infrastructure of an operational service for safe and efficient navigation in the Mediterranean Sea

    Science.gov (United States)

    Mannarini, Gianandrea; Turrisi, Giuseppe; D'Anca, Alessandro; Scalas, Mario; Pinardi, Nadia; Coppini, Giovanni; Palermo, Francesco; Carluccio, Ivano; Scuro, Matteo; Cretì, Sergio; Lecci, Rita; Nassisi, Paola; Tedesco, Luca

    2016-08-01

    VISIR (discoVerIng Safe and effIcient Routes) is an operational decision support system (DSS) for optimal ship routing designed and implemented in the frame of the TESSA (TEchnology for Situational Sea Awareness) project. The system is aimed to increase safety and efficiency of navigation through the use of forecast environmental fields and route optimization. VISIR can be accessed through a web interface (www.visir-nav.com) and mobile applications for both iOS and Android devices. This paper focuses on the technological infrastructure developed for operating VISIR as a DSS. Its main components are described, the performance of the operational system is assessed through experimental measurements, and a few case studies are presented.

  8. Guidewire retention following central venous catheterisation: a human factors and safe design investigation.

    Science.gov (United States)

    Horberry, Tim; Teng, Yi-Chun; Ward, James; Patil, Vishal; Clarkson, P John

    2014-01-01

    Central Venous Catheterisation (CVC) has occasionally been associated with cases of retained guidewires in patients after surgery. In theory, this is a completely avoidable complication; however, as with any human procedure, operator error leading to guidewires being occasionally retained cannot be fully eliminated. The work described here investigated the issue in an attempt to better understand it both from an operator and a systems perspective, and to ultimately recommend appropriate safe design solutions that reduce guidewire retention errors. Nine distinct methods were used: observations of the procedure, a literature review, interviewing CVC end-users, task analysis construction, CVC procedural audits, two human reliability assessments, usability heuristics and a comprehensive solution survey with CVC end-users. The three solutions that operators rated most highly, in terms of both practicality and effectiveness, were: making trainees better aware of the potential guidewire complications and strongly emphasising guidewire removal in CVC training, actively checking that the guidewire is present in the waste tray for disposal, and standardising purchase of central line sets so that differences that may affect chances of guidewire loss is minimised. Further work to eliminate/engineer out the possibility of guidewires being retained is proposed.

  9. Operational circular No. 9 – Principles and procedures governing complaints of harassment

    CERN Multimedia

    HR Department

    2011-01-01

    Operational Circular No. 9 entitled "Principles and Procedures Governing Complaints of Harassment", approved by the Director-General following discussion in the Standing Concertation Committee meeting on 21 March 2011, is available on the intranet site of the Human Resources Department: https://cern.ch/hr-docs/opcirc/opcirc.asp Operational Circular No. 9 is applicable to any person working at or on behalf of CERN. It cancels and replaces Administrative Circular No. 32 entitled "Principles and Procedures Governing Complaints of Harassment” of February 2000. Department Head Office

  10. Denying Sanctuary: Rejecting Safe Havens in Counterinsurgency Operations

    National Research Council Canada - National Science Library

    Monarch, Robert M

    2009-01-01

    Physical sanctuary is one of the bedrocks of a successful insurgency. Denial of these safe havens is critical to a successful counterinsurgency campaign and the eventual defeat of the insurgents by the host state...

  11. Factors determining outcomes in grown up patients operated for congenital heart diseases

    Directory of Open Access Journals (Sweden)

    Sachin Talwar

    2016-01-01

    Conclusion: GUCH can be safely operated when adequate caution is taken in the presence of independent predictors such as previous sternotomy, aortic clamp time >45 min, cyanosis, and emergency procedure.

  12. Design for maintenance during operation

    International Nuclear Information System (INIS)

    Barton, P.H.; Lyerly, H.D.

    1976-01-01

    Design of a nuclear power plant for safe, reliable and efficient operation involves much more than theory, regulations, regulatory guides, procedures, inspectors, and even quality assurance. It also involves a full knowledge and understanding of the activities which must be carried out to operate and maintain the plant. It must be remembered that a nuclear power plant is different from fossil designs and the designer must constantly keep in mind that access by people to every component is required for maintenance

  13. Computer aids for plant operators

    International Nuclear Information System (INIS)

    Joly, J.P.

    1992-01-01

    For some time, particularly since the TMI accident, nuclear power plant operators have been aware of the difficulties involved in diagnosing accidents and returning plants to their stable, safe operating mode. There are various possible solutions to these problems: improve control organization during accident situations, rewrite control procedures, integrate safety engineers in shifts, improve control rooms, and implement additional computer aids. The purpose of this presentation is to describe the efforts undertaken by EDF over the last few years in this field

  14. Oak Ridge National Laboratory whole-body counter: internal operating procedure manual

    International Nuclear Information System (INIS)

    Berger, C.D.; Lane, B.H.

    1982-08-01

    The general purpose of the ORNL Whole Body Counter is to provide a rapid estimation of the type and quantity of radionuclide deposited in the human body. This report contains a review of the equipment in use at the facility and the procedure for its operation, the standard procedure for performing a routine whole body count, and a discussion of interpretation of results

  15. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  16. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  17. 46{sup th} Annual meeting on nuclear technology (AMNT 2015). Key topic / Enhanced safety and operation excellence / Sustainable reactor operation management - safe, efficient, valuable

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, Erwin [E.ON Kernkraft GmbH, Global Unit Next Generation, Hannover (Germany)

    2015-08-15

    Summary report on the following Topical Session of the 46{sup th} Annual Conference on Nuclear Technology (AMNT 2015) held in Berlin, 5 to 7 May 2015: - Sustainable Reactor Operation Management - Safe, Efficient, Valuable (Erwin Fischer) The other Sessions of the Key Topics - ''Outstanding Know-How and Sustainable Innovations'', - ''Enhanced Safety and Operation Excellence'' and - ''Decommissioning Experience and Waste Management Solutions'' have been covered in atw 7 (2015) and will be covered in further issues of atw.

  18. Flowchart-format emergency operating procedures-strengths and weaknesses

    International Nuclear Information System (INIS)

    Barnes, V.E.; Bongarra, J.P. Jr.

    1989-01-01

    An increasing number of nuclear power plant licensees are converting their text-format emergency operating procedures (EOPs) to flowcharts. Findings of a recent study of the flowchart-format EOPs indicate that the flowchart format appears to solve several significant usability problems associated with text-format EOPs, but also introduces other types of usability concerns. This paper discusses some of the strengths and weaknesses of the flowchart format for presenting EOPs

  19. Improving the review of standard operating procedures: a novel electronic system for compounding pharmacies.

    Science.gov (United States)

    Brensel, Robert; Brensel, Scott; Ng, Amy

    2013-01-01

    Since the New England Compounding Center disaster in 2012, the importance of following correct procedures during every phase of customized pharmacy has been a focus of governmental interest and action as well as public scrutiny. Many pharmacies rely on the rote review of standard operating procedures to ensure that staff members understand and follow protocols that ensure the safety and potency of all compounds prepared, but that approach to continuing education can be cumbersome and needlessly time-consuming. In addition, documenting and retrieving evidence of employee competence can be difficult. In this article, we describe our use of online technology to improve our methods of educating staff about the full range of standard operating procedures that must be followed in our pharmacy. The system we devised and implemented has proven to be effective, easy to update and maintain, very inexpensive, and user friendly. Its use has reduced the time previously required for a read-over review of standard operating procedures from 30 or 40 minutes to 5 or 10 minutes in weekly staff meetings, and we can now easily document and access proof of employees' comprehension of that content. It is our hope that other small compounding pharmacies will also find this system of online standard operating procedure review helpful.

  20. Operational radioactive defense waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1981-07-01

    The Operational Radioactive Defense Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  1. An operational procedure for rapid flood risk assessment in Europe

    Science.gov (United States)

    Dottori, Francesco; Kalas, Milan; Salamon, Peter; Bianchi, Alessandra; Alfieri, Lorenzo; Feyen, Luc

    2017-07-01

    The development of methods for rapid flood mapping and risk assessment is a key step to increase the usefulness of flood early warning systems and is crucial for effective emergency response and flood impact mitigation. Currently, flood early warning systems rarely include real-time components to assess potential impacts generated by forecasted flood events. To overcome this limitation, this study describes the benchmarking of an operational procedure for rapid flood risk assessment based on predictions issued by the European Flood Awareness System (EFAS). Daily streamflow forecasts produced for major European river networks are translated into event-based flood hazard maps using a large map catalogue derived from high-resolution hydrodynamic simulations. Flood hazard maps are then combined with exposure and vulnerability information, and the impacts of the forecasted flood events are evaluated in terms of flood-prone areas, economic damage and affected population, infrastructures and cities.An extensive testing of the operational procedure has been carried out by analysing the catastrophic floods of May 2014 in Bosnia-Herzegovina, Croatia and Serbia. The reliability of the flood mapping methodology is tested against satellite-based and report-based flood extent data, while modelled estimates of economic damage and affected population are compared against ground-based estimations. Finally, we evaluate the skill of risk estimates derived from EFAS flood forecasts with different lead times and combinations of probabilistic forecasts. Results highlight the potential of the real-time operational procedure in helping emergency response and management.

  2. Dukovany NPP - Safely 16 TERA

    International Nuclear Information System (INIS)

    Vlcek, J.

    2008-01-01

    In this presentation increasing of power output of the Dukovany NPP is reviewed. To operate all Dukovany Units safely with the perspective of long-term operation (LTO) of 50 - 60 years it is proposed.

  3. Managing Cassini Safe Mode Attitude at Saturn

    Science.gov (United States)

    Burk, Thomas A.

    2010-01-01

    The Cassini spacecraft was launched on October 15, 1997 and arrived at Saturn on June 30, 2004. It has performed detailed observations and remote sensing of Saturn, its rings, and its satellites since that time. In the event safe mode interrupts normal orbital operations, Cassini has flight software fault protection algorithms to detect, isolate, and recover to a thermally safe and commandable attitude and then wait for further instructions from the ground. But the Saturn environment is complex, and safety hazards change depending on where Cassini is in its orbital trajectory around Saturn. Selecting an appropriate safe mode attitude that insures safe operation in the Saturn environment, including keeping the star tracker field of view clear of bright bodies, while maintaining a quiescent, commandable attitude, is a significant challenge. This paper discusses the Cassini safe table management strategy and the key criteria that must be considered, especially during low altitude flybys of Titan, in deciding what spacecraft attitude should be used in the event of safe mode.

  4. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training.

    Science.gov (United States)

    van Det, M J; Meijerink, W J H J; Hoff, C; Middel, B; Pierie, J P E N

    2013-08-01

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training in the operating theater, but this model lacks uniformity and efficiency at the beginning of the learning curve. This study was designed to investigate the effectiveness and efficiency of INVEST compared to MAM. Ten surgical residents with no laparoscopic experience were recruited for a laparoscopic cholecystectomy training curriculum either by the MAM or with INVEST. After a uniform course in basic laparoscopic skills, each trainee performed six cholecystectomies that were digitally recorded. For 14 steps of the procedure, an observer who was blinded for the type of training determined whether the step was performed entirely by the trainee (2 points), partially by the trainee (1 point), or by the supervisor (0 points). Time measurements revealed the total procedure time and the amount of effective procedure time during which the trainee acted as the operating surgeon. Results were compared between both groups. Trainees in the INVEST group were awarded statistically significant more points (115.8 vs. 70.2; p < 0.001) and performed more steps without the interference of the supervisor (46.6 vs. 18.8; p < 0.001). Total procedure time was not lengthened by INVEST, and the part performed by trainees was significantly larger (69.9 vs. 54.1 %; p = 0.004). INVEST enhances effectiveness and training efficiency for procedural training inside the operating theater without compromising operating theater time efficiency.

  5. Procedure for hazards analysis of plutonium gloveboxes used in analytical chemistry operations

    International Nuclear Information System (INIS)

    Delvin, W.L.

    1977-06-01

    A procedure is presented to identify and assess hazards associated with gloveboxes used for analytical chemistry operations involving plutonium. This procedure is based upon analytic tree methodology and it has been adapted from the US Energy Research and Development Administration's safety program, the Management Oversight and Risk Tree

  6. Design of test and emergency procedures to improve operator behaviour in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1982-09-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: - the elaboration of a procedure for action and of a separate educational procedure, - the coordination of crew responses, - the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  7. Design of test and emergency procedures to improve operator behavior in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1983-01-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: the elaboration of a procedure for action and of separate educational procedure; the coordination of crew responses; and the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  8. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  9. The safe operation zone of the spark ignition engine working with dual renewable supplemented fuels (hydrogen+ethyl alcohol)

    Energy Technology Data Exchange (ETDEWEB)

    Al-Baghdadi, Maher Abdul-Resul Sadiq [Babylon Univ., Dept. of Mechanical Engineering, Babylon (Iraq)

    2001-04-01

    The effect of the amount of hydrogen/ethyl alcohol addition on the performance and pollutant emission of a four-stroke spark ignition engine has been studied. The results of the study show that all engine performance parameters have been improved when operating the gasoline spark ignition engine with dual addition of hydrogen and ethyl alcohol. The important improvements of alcohol addition are to reduce the NOx emission while increasing the higher useful compression ratio and output power of hydrogen-supplemented engine. An equation has been derived from experimental data to specify the least quantity of ethyl alcohol blended with gasoline and satisfying constant NOx emission when hydrogen is added. A chart limiting the safe operation zone of the engine fueled with dual renewable supplemented fuel, (hydrogen and ethyl alcohol) has been produced. The safe zone provides lower NOx and CO emission, lower s.f.c. and higher brake power compared to an equivalent gasoline engine. When ethyl alcohol is increased over 30%, it causes unstable engine operation which can be related to the fact that the fuel is not vaporized, and this causes a reduction in both brake power and efficiency. (Author)

  10. Prioritizing essential surgery and safe anesthesia for the Post-2015 Development Agenda: operative capacities of 78 district hospitals in 7 low- and middle-income countries.

    Science.gov (United States)

    LeBrun, Drake G; Chackungal, Smita; Chao, Tiffany E; Knowlton, Lisa M; Linden, Allison F; Notrica, Michelle R; Solis, Carolina V; McQueen, K A Kelly

    2014-03-01

    Surgery has been neglected in low- and middle-income countries for decades. It is vital that the Post-2015 Development Agenda reflect that surgery is an important part of a comprehensive global health care delivery model. We compare the operative capacities of multiple low- and middle-income countries and identify critical gaps in surgical infrastructure. The Harvard Humanitarian Initiative survey tool was used to assess the operative capacities of 78 government district hospitals in Bangladesh (n = 7), Bolivia (n = 11), Ethiopia (n = 6), Liberia (n = 11), Nicaragua (n = 10), Rwanda (n = 21), and Uganda (n = 12) from 2011 to 2012. Key outcome measures included infrastructure, equipment availability, physician and nonphysician surgical providers, operative volume, and pharmaceutical capacity. Seventy of 78 district hospitals performed operations. There was fewer than one surgeon or anesthesiologist per 100,000 catchment population in all countries except Bolivia. There were no physician anesthesiologists in any surveyed hospitals in Rwanda, Liberia, Uganda, or in the majority of hospitals in Ethiopia. Mean annual operations per hospital ranged from 374 in Nicaragua to 3,215 in Bangladesh. Emergency operations and obstetric operations constituted 57.5% and 40% of all operations performed, respectively. Availability of pulse oximetry, essential medicines, and key infrastructure (water, electricity, oxygen) varied widely between and within countries. The need for operative procedures is not being met by the limited operative capacity in numerous low- and middle-income countries. It is of paramount importance that this gap be addressed by prioritizing essential surgery and safe anesthesia in the Post-2015 Development Agenda. Copyright © 2014 Mosby, Inc. All rights reserved.

  11. General decoupling procedure for expectation values of four-operator products in electron–phonon quantum kinetics

    International Nuclear Information System (INIS)

    Teeny, Nicolas; Fähnle, Manfred

    2013-01-01

    In the density-matrix formalism of electron–phonon quantum kinetics, the hierarchy of infinitely many coupled equations of motion for the expectation values of products of electron and phonon creation and annihilation operators of arbitrary order is usually terminated on the level of the equations of motion for the expectation values of three-operator products by using decoupling procedures for the four-operator products occurring in these equations. In the literature, decoupling procedures are discussed for special types of electron and phonon states. In the present paper, generalized decoupling procedures are derived for arbitrary electron and phonon states. (paper)

  12. The European Stroke Organisation Guidelines: a standard operating procedure.

    Science.gov (United States)

    Ntaios, George; Bornstein, Natan M; Caso, Valeria; Christensen, Hanne; De Keyser, Jacques; Diener, Hans-Christoph; Diez-Tejedor, Exuperio; Ferro, Jose M; Ford, Gary A; Grau, Armin; Keller, Emanuella; Leys, Didier; Russell, David; Toni, Danilo; Turc, Guillaume; Van der Worp, Bart; Wahlgren, Nils; Steiner, Thorsten

    2015-10-01

    In 2008, the recently founded European Stroke Organisation published its guidelines for the management of ischemic stroke and transient ischemic attack. This highly cited document was translated in several languages and was updated in 2009. Since then, the European Stroke Organisation has published guidelines for the management of intracranial aneurysms and subarachnoidal hemorrhage, for the establishment of stroke units and stroke centers, and recently for the management of intracerebral hemorrhage. In recent years, the methodology for the development of guidelines has evolved significantly. To keep pace with this progress and driven by the strong determination of the European Stroke Organisation to further promote stroke management, education, and research, the European Stroke Organisation decided to delineate a detailed standard operating procedure for its guidelines. There are two important cornerstones in this standard operating procedure: The first is the implementation of the Grading of Recommendations Assessment, Development, and Evaluation methodology for the development of its Guideline Documents. The second one is the decision of the European Stroke Organisation to move from the classical model of a single Guideline Document about a major topic (e.g. management of ischemic stroke) to focused modules (i.e. subdivisions of a major topic). This will enable the European Stroke Organisation to react faster when new developments in a specific stroke field occur and update its recommendations on the related module rather swiftly; with the previous approach of a single large Guideline Document, its entire revision had to be completed before an updated publication, delaying the production of up-to-date guidelines. After discussion within the European Stroke Organisation Guidelines Committee and significant input from European Stroke Organisation members as well as methodologists and analysts, this document presents the official standard operating procedure for

  13. From Planetary Boundaries to national fair shares of the global safe operating space - How can the scales be bridged?

    Science.gov (United States)

    Häyhä, Tiina; Cornell, Sarah; Lucas, Paul; van Vuuren, Detlef; Hoff, Holger

    2016-04-01

    The planetary boundaries framework proposes precautionary quantitative global limits to the anthropogenic perturbation of crucial Earth system processes. In this way, it marks out a planetary 'safe operating space' for human activities. However, decisions regarding resource use and emissions are mostly made at much smaller scales, mostly by (sub-)national and regional governments, businesses, and other local actors. To operationalize the planetary boundaries, they need to be translated into and aligned with targets that are relevant at these smaller scales. In this paper, we develop a framework that addresses the three dimension of bridging across scales: biophysical, socio-economic and ethical, to provide a consistent universally applicable approach for translating the planetary boundaries into national level context-specific and fair shares of the safe operating space. We discuss our findings in the context of previous studies and their implications for future analyses and policymaking. In this way, we help link the planetary boundaries framework to widely- applied operational and policy concepts for more robust strong sustainability decision-making.

  14. Water chemistry technology. One of the key technologies for safe and reliable nuclear power plant operation

    International Nuclear Information System (INIS)

    Uchida, Shunsuke; Katsumura, Yosuke

    2013-01-01

    Water chemistry control is one of the key technologies to establish safe and reliable operation of nuclear power plants. Continuous and collaborative efforts of plant manufacturers and plant operator utilities have been focused on optimal water chemistry control, for which, a trio of requirements for water chemistry should be simultaneously satisfied: (1) better reliability of reactor structures and fuel rods; (2) lower occupational exposure and (3) fewer radwaste sources. Various groups in academia have carried out basic research to support the technical bases of water chemistry in plants. The Research Committee on Water Chemistry of the Atomic Energy Society of Japan (AESJ), which has now been reorganized as the Division of Water Chemistry (DWC) of AESJ, has played important roles to promote improvements in water chemistry control, to share knowledge about and experiences with water chemistry control among plant operators and manufacturers and to establish common technological bases for plant water chemistry and then to transfer them to the next generation of plant workers engaged in water chemistry. Furthermore, the DWC has tried and succeeded arranging R and D proposals for further improvement in water chemistry control through roadmap planning. In the paper, major achievements in plant technologies and in basic research studies of water chemistry in Japan are reviewed. The contributions of the DWC to the long-term safe management of the damaged reactors at the Fukushima Daiichi Nuclear Power Plant until their decommissioning are introduced. (author)

  15. Lessons learned from operating experience, maintenance procedures and training measures

    International Nuclear Information System (INIS)

    Guttner, K.; Gronau, D.

    2003-01-01

    Training programmes for nuclear facility personnel as a result of the developing phase of SAT have to be approved in the subsequent implementation and evaluation phases with the consequence of several feedback activities in the whole training process. The effectiveness of this procedure has to be evaluated especially with respect to an improvement of safety culture, shorter outage times or better plant performance, resulting in a smaller number of incidents due to human failures. The first two arguments are directly connected with all types of maintenance work in a nuclear power plant and the related preparatory training measures. The reduction of incidents due to human failures is the result of different influences, i.e. training of the operational as well as of the maintenance personnel together with changes of the operating procedures or system design. Though an evaluation of the training process should always be based on a clear definition of criteria by which the fulfilment of the learning objectives can be measured directly, the real effectiveness of training is proven by the behaviour and attitude of the personnel which can only be taken from indirect indicators. This is discussed in more detail for some examples being partly related to the above mentioned arguments. An excellent plant performance, representing a general objective of all activities, can be analysed by the changed number and reasons of incidents in a plant during its operation time. Two further examples are taken from the reactor service field where there is a tendency to reduce the individual dose rates by changed devices and/or procedures as an output from training experience with mockups. Finally the rationalisation of refresher training for operational personnel by the use of interactive teaching programs (Computer Based Training - CBT) is presented which integrate learning objectives together with a test module. (author)

  16. Computer Based Procedures for Field Workers - FY16 Research Activities

    International Nuclear Information System (INIS)

    Oxstrand, Johanna; Bly, Aaron

    2016-01-01

    The Computer-Based Procedure (CBP) research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. One area that could yield tremendous savings in increased efficiency and safety is in improving procedure use. A CBP provides the opportunity to incorporate context-driven job aids, such as drawings, photos, and just-in-time training. The presentation of information in CBPs can be much more flexible and tailored to the task, actual plant condition, and operation mode. The dynamic presentation of the procedure will guide the user down the path of relevant steps, thus minimizing time spent by the field worker to evaluate plant conditions and decisions related to the applicability of each step. This dynamic presentation of the procedure also minimizes the risk of conducting steps out of order and/or incorrectly assessed applicability of steps. This report provides a summary of the main research activities conducted in the Computer-Based Procedures for Field Workers effort since 2012. The main focus of the report is on the research activities conducted in fiscal year 2016. The activities discussed are the Nuclear Electronic Work Packages - Enterprise Requirements initiative, the development of a design guidance for CBPs (which compiles all insights gained through the years of CBP research), the facilitation of vendor studies at the Idaho National Laboratory (INL) Advanced Test Reactor (ATR), a pilot study for how to enhance the plant design modification work process, the collection of feedback from a field evaluation study at Plant Vogtle, and path forward to

  17. Computer Based Procedures for Field Workers - FY16 Research Activities

    Energy Technology Data Exchange (ETDEWEB)

    Oxstrand, Johanna [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bly, Aaron [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-09-01

    The Computer-Based Procedure (CBP) research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. One area that could yield tremendous savings in increased efficiency and safety is in improving procedure use. A CBP provides the opportunity to incorporate context-driven job aids, such as drawings, photos, and just-in-time training. The presentation of information in CBPs can be much more flexible and tailored to the task, actual plant condition, and operation mode. The dynamic presentation of the procedure will guide the user down the path of relevant steps, thus minimizing time spent by the field worker to evaluate plant conditions and decisions related to the applicability of each step. This dynamic presentation of the procedure also minimizes the risk of conducting steps out of order and/or incorrectly assessed applicability of steps. This report provides a summary of the main research activities conducted in the Computer-Based Procedures for Field Workers effort since 2012. The main focus of the report is on the research activities conducted in fiscal year 2016. The activities discussed are the Nuclear Electronic Work Packages – Enterprise Requirements initiative, the development of a design guidance for CBPs (which compiles all insights gained through the years of CBP research), the facilitation of vendor studies at the Idaho National Laboratory (INL) Advanced Test Reactor (ATR), a pilot study for how to enhance the plant design modification work process, the collection of feedback from a field evaluation study at Plant Vogtle, and path forward to

  18. Rules and procedures for the design and operation of hazardous research equipment

    International Nuclear Information System (INIS)

    1978-12-01

    The manual has been prepared for use by research personnel involved in experiments at the Lawrence Berkeley Laboratory. It contains rules and procedures for the design, test, installation, and operation of hazardous research equipment. Sect. I contains such information as responsibility of experimenters for safety, descriptions of the various Laboratory safety organizations, and enumeration of various services available to experimenters at the Laboratory. Sect. II describes specific rules for the setup and operation of experimental equipment at the Laboratory. Sect. III gives detailed design criteria and procedures for equipment frequently encountered in the high energy physics laboratory

  19. 78 FR 47817 - Parts and Accessories Necessary for Safe Operation; Application for an Exemption From Van Hool N...

    Science.gov (United States)

    2013-08-06

    ... DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration [Docket No. FMCSA-2013-0314] Parts and Accessories Necessary for Safe Operation; Application for an Exemption From Van Hool N... exemption from Van Hool N.V. and Coach USA (Van Hool/Coach USA) to allow the use of double deck motorcoaches...

  20. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    Science.gov (United States)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  1. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training

    OpenAIRE

    van Det, M.J.; Meijerink, W.J.; Hoff, C.; Middel, B.; Pierie, J.P.

    2013-01-01

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training in the operating theater, but this model lacks uniformity and efficiency at the beginning of the learning curve. This study was designed to investigate the effectiveness and efficiency of INVEST co...

  2. The Comparison of Lichtenstein Procedure with and without Mesh-Fixation for Inguinal Hernia Repair

    Directory of Open Access Journals (Sweden)

    Feyzullah Ersoz

    2016-01-01

    Full Text Available Aim. Although inguinal hernia repair is the most frequently performed surgical procedure in the world, the best repair method has not gained acceptance yet. The ideal repair must be safe, simple, and easy to perform and require minimal dissection which provides enough exploration, maintain patient’s comfort in the early stage, and also be cost-effective, reducing operation costs, labor loss, hospital stay, and recurrence. Materials and Methods. There were eighty-five patients between the ages of 18 and 75, diagnosed with inguinal hernia in our clinic. Lichtenstein procedure for hernia repair was performed under spinal anesthesia in all patients. Forty-two patients had the standard procedure and, in 43 patients, the polypropylene mesh was used without fixation. All patients were examined and questioned on the 7th day of the operation in terms of pain, scrotal edema, and the presence of seroma and later on in the 6th postoperative month in terms of paresthesia, neuropraxia, and recurrence by a single physician. Results. Operative time and pain scores in the nonfixation group were significantly lower, without any increase in rates of recurrence. Conclusion. Based on these findings, in Lichtenstein hernia repair method, nonfixation technique can be used safely with better results.

  3. Assessment of different concentrations of ketofol in procedural operations

    International Nuclear Information System (INIS)

    Daabiss, Mohamed; Elsherbiny, Medhat; Al Otaibi, Rashed

    2009-01-01

    Propofol is an intravenous anesthetic that is often used as an adjuvant during monitored anesthesia care, the addition of ketamine to propofol may counteract the cardiorespiratory depression seen with propofol used alone. Ketofol (ketamine/propofol combination) was used for procedural sedation and analgesia. However, evaluation of the effectiveness of different concentrations of Ketofol in procedural operation regarding changes in haemodynamics, emergence phenomena, recovery time, the doses, and adverse effects was not yet studied, so this randomized, double blinded study was designed to compare the quality of analgesia and side effects of intravenous different concentrations of ketofol. One hundred children of both sex undergoing procedural operation, e.g. esophgoscopy, rectoscopy, bone marrow aspiration and liver biopsy participated in this. Patients received an infusion of a solution containing either combination of propofol: ketamine (1:1) (Group I) or propofol: ketamine (4:1) (Group II). Subsequent infusion rates to a predetermined sedation level using Ramsay Sedation Scale. Heart rate, noninvasive arterial blood pressure (NIBP), oxygen saturation (SpO2), end tidal carbon dioxide (Etco 2 ) and incidence of any side effects were recorded. There were no significant hemodynamic changes in both groups after induction. However, there was an increase in postoperative nausea, psychomimetic side effects, and delay in discharge times in group I compared to group II. The adjunctive use of smaller dose of ketamine in ketofol combination minimizes the psychomimetic side effects and shortens the time of hospital discharge. (author)

  4. Standardized Procedure Content And Data Structure Based On Human Factors Requirements For Computer-Based Procedures

    International Nuclear Information System (INIS)

    Bly, Aaron; Oxstrand, Johanna; Le Blanc, Katya L

    2015-01-01

    Most activities that involve human interaction with systems in a nuclear power plant are guided by procedures. Traditionally, the use of procedures has been a paper-based process that supports safe operation of the nuclear power industry. However, the nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. Advances in digital technology make computer-based procedures (CBPs) a valid option that provides further enhancement of safety by improving human performance related to procedure use. The transition from paper-based procedures (PBPs) to CBPs creates a need for a computer-based procedure system (CBPS). A CBPS needs to have the ability to perform logical operations in order to adjust to the inputs received from either users or real time data from plant status databases. Without the ability for logical operations the procedure is just an electronic copy of the paper-based procedure. In order to provide the CBPS with the information it needs to display the procedure steps to the user, special care is needed in the format used to deliver all data and instructions to create the steps. The procedure should be broken down into basic elements and formatted in a standard method for the CBPS. One way to build the underlying data architecture is to use an Extensible Markup Language (XML) schema, which utilizes basic elements to build each step in the smart procedure. The attributes of each step will determine the type of functionality that the system will generate for that step. The CBPS will provide the context for the step to deliver referential information, request a decision, or accept input from the user. The XML schema needs to provide all data necessary for the system to accurately perform each step without the need for the procedure writer to reprogram the CBPS. The research team at the Idaho National Laboratory has developed a prototype CBPS for field workers as well as the

  5. Standardized Procedure Content And Data Structure Based On Human Factors Requirements For Computer-Based Procedures

    Energy Technology Data Exchange (ETDEWEB)

    Bly, Aaron; Oxstrand, Johanna; Le Blanc, Katya L

    2015-02-01

    Most activities that involve human interaction with systems in a nuclear power plant are guided by procedures. Traditionally, the use of procedures has been a paper-based process that supports safe operation of the nuclear power industry. However, the nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. Advances in digital technology make computer-based procedures (CBPs) a valid option that provides further enhancement of safety by improving human performance related to procedure use. The transition from paper-based procedures (PBPs) to CBPs creates a need for a computer-based procedure system (CBPS). A CBPS needs to have the ability to perform logical operations in order to adjust to the inputs received from either users or real time data from plant status databases. Without the ability for logical operations the procedure is just an electronic copy of the paper-based procedure. In order to provide the CBPS with the information it needs to display the procedure steps to the user, special care is needed in the format used to deliver all data and instructions to create the steps. The procedure should be broken down into basic elements and formatted in a standard method for the CBPS. One way to build the underlying data architecture is to use an Extensible Markup Language (XML) schema, which utilizes basic elements to build each step in the smart procedure. The attributes of each step will determine the type of functionality that the system will generate for that step. The CBPS will provide the context for the step to deliver referential information, request a decision, or accept input from the user. The XML schema needs to provide all data necessary for the system to accurately perform each step without the need for the procedure writer to reprogram the CBPS. The research team at the Idaho National Laboratory has developed a prototype CBPS for field workers as well as the

  6. Generalized peritonitis due to perforated diverticulitis: Hartmann's procedure or primary anastomosis?

    Science.gov (United States)

    Trenti, Loris; Biondo, Sebastiano; Golda, Thomas; Monica, Millan; Kreisler, Esther; Fraccalvieri, Domenico; Frago, Ricardo; Jaurrieta, Eduardo

    2011-03-01

    Hartmann's procedure (HP) still remains the most frequently performed procedure for diffuse peritonitis due to perforated diverticulitis. The aims of this study were to assess the feasibility and safety of resection with primary anastomosis (RPA) in patients with purulent or fecal diverticular peritonitis and review morbidity and mortality after single stage procedure and Hartmann in our experience. From January 1995 through December 2008, patients operated for generalized diverticular peritonitis were studied. Patients were classified into two main groups: RPA and HP. A total of 87 patients underwent emergency surgery for diverticulitis complicated with purulent or diffuse fecal peritonitis. Sixty (69%) had undergone HP while RPA was performed in 27 patients (31%). At the multivariate analysis, RPA was associated with less post-operative complications (P clinical anastomotic leakage and needed re-operation. RPA can be safely performed without adding morbidity and mortality in cases of diffuse diverticular peritonitis. HP should be reserved only for hemodynamically unstable or high-risk patients. Specialization in colorectal surgery improves mortality and raises the percentage of one-stage procedures.

  7. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  8. Prediction of post-operative pain after a laparoscopic tubal ligation procedure

    DEFF Research Database (Denmark)

    Rudin, A.; Wolner-Hanssen, P.; Hellbom, M.

    2008-01-01

    ligation procedure. METHODS: Assessments of anxiety, mood, psychological vulnerability and pre-operative pain were made before surgery using the State-Trait Anxiety Inventory (STAI), the Hospital Anxiety Depression Scale (HADS), a psychological vulnerability test and the Short-Form McGill Pain......BACKGROUND: Pre-operative identification of reliable predictors of post-operative pain may lead to improved pain management strategies. We investigated the correlation between pre-operative pain, psychometric variables, response to heat stimuli and post-operative pain following a laparoscopic tubal...... Questionnaire (SF-MPQ), respectively. Pre-operative assessments of thermal thresholds and pain response to randomized series of heat stimuli (1 s, 44-48 degrees C) were made with quantitative sensory testing technique. Post-operative pain intensity was evaluated daily by a visual analogue scale during rest...

  9. Guidelines for the presentation of emergency operating procedures using advanced information technology

    International Nuclear Information System (INIS)

    Green, M.; Hollnagel, E.; Niwa, Yuji

    1994-01-01

    New methods of information presentation and interface design are changing the conditions for work in the modern NPP control room. One area receiving considerable attention is that of Emergency Operating Procedures (EOP). Conventionally such procedures are presented using hard copy manuals; however, development in IT means that there are new opportunities for the computerization of such procedures. This paper reports on the development of human factors guidelines for the computerized presentation of EOPs. After identifying the principle stages in the transition from procedures as documents to fully automated procedures, computerised procedure presentation is briefly discussed. Guidelines for the presentation of such procedures are outlined starting with the high level goals for guidelines themselves. Such goals also constitute the criteria against which the computerized procedures are measured during implementation. Six dimensions describing computerized procedure presentation are presented and two are explore in more detail by identifying points along each dimension that characterize different levels of IT sophistication. (author). 8 refs, 1 tab

  10. Best Safety Practices for the Operation of Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Boeck, H.; Villa, M. [Atominstitute of the Austrian Universities, 1020 Vienna (Austria)

    2002-07-01

    A survey on administrative, organisational and technical aspects for the safe and efficient operation of a 250 kW TRIGA Mark II research reactor is given. The replacement of the I and C system is discussed, maintenance procedures are presented and the fuel management is described. (author)

  11. Best Safety Practices for the Operation of Research Reactors

    International Nuclear Information System (INIS)

    Boeck, H.; Villa, M.

    2002-01-01

    A survey on administrative, organisational and technical aspects for the safe and efficient operation of a 250 kW TRIGA Mark II research reactor is given. The replacement of the I and C system is discussed, maintenance procedures are presented and the fuel management is described. (author)

  12. Outcomes of PCI in Relation to Procedural Characteristics and Operator Volumes in the United States.

    Science.gov (United States)

    Fanaroff, Alexander C; Zakroysky, Pearl; Dai, David; Wojdyla, Daniel; Sherwood, Matthew W; Roe, Matthew T; Wang, Tracy Y; Peterson, Eric D; Gurm, Hitinder S; Cohen, Mauricio G; Messenger, John C; Rao, Sunil V

    2017-06-20

    Professional guidelines have reduced the recommended minimum number to an average of 50 percutaneous coronary intervention (PCI) procedures performed annually by each operator. Operator volume patterns and associated outcomes since this change are unknown. The authors describe herein PCI operator procedure volumes; characteristics of low-, intermediate-, and high-volume operators; and the relationship between operator volume and clinical outcomes in a large, contemporary, nationwide sample. Using data from the National Cardiovascular Data Registry collected between July 1, 2009, and March 31, 2015, we examined operator annual PCI volume. We divided operators into low- (100 PCIs per year) volume groups, and determined the adjusted association between annual PCI volume and in-hospital outcomes, including mortality. The median annual number of procedures performed per operator was 59; 44% of operators performed PCI procedures per year. Low-volume operators more frequently performed emergency and primary PCI procedures and practiced at hospitals with lower annual PCI volumes. Unadjusted in-hospital mortality was 1.86% for low-volume operators, 1.73% for intermediate-volume operators, and 1.48% for high-volume operators. The adjusted risk of in-hospital mortality was higher for PCI procedures performed by low- and intermediate-volume operators compared with those performed by high-volume operators (adjusted odds ratio: 1.16 for low versus high; adjusted odds ratio: 1.05 for intermediate vs. high volume) as was the risk for new dialysis post PCI. No volume relationship was observed for post-PCI bleeding. Many PCI operators in the United States are performing fewer than the recommended number of PCI procedures annually. Although absolute risk differences are small and may be partially explained by unmeasured differences in case mix between operators, there remains an inverse relationship between PCI operator volume and in-hospital mortality that persisted in risk

  13. A Short-Circuit Safe Operation Area Identification Criterion for SiC MOSFET Power Modules

    DEFF Research Database (Denmark)

    Reigosa, Paula Diaz; Iannuzzo, Francesco; Luo, Haoze

    2017-01-01

    This paper proposes a new method for the investigation of the short-circuit safe operation area (SCSOA) of state-of-the-art SiC MOSFET power modules rated at 1.2 kV based on the variations in SiC MOSFET electrical parameters (e.g., short-circuit current and gate–source voltage). According...... to the experimental results, two different failure mechanisms have been identified, both reducing the short-circuit capability of SiC power modules with respect to discrete SiC devices. Based on such failure mechanisms, two short-circuit safety criteria have been formulated: 1) the short-circuit...

  14. 76 FR 54528 - Standard Operating Procedures (SOP) of the Aircraft Certification Service (AIR) Process for the...

    Science.gov (United States)

    2011-09-01

    ...) of the Aircraft Certification Service (AIR) Process for the Sequencing of Certification and... on the Aircraft Certification Service (AIR) standard operating procedure (SOP) describing the process... comments on the SOP : AIR-100-001; Standard Operating Procedure--Aircraft Certification Service Project...

  15. Laparoscopic Whipple procedure: review of the literature.

    Science.gov (United States)

    Gagner, Michel; Palermo, Mariano

    2009-01-01

    Laparoscopic pancreatic surgery represents one of the most advanced applications for laparoscopic surgery currently in use. In the past, minimally invasive techniques were only used for diagnostic laparoscopy, staging of pancreatic cancer, and palliative procedures for unresectable pancreatic cancer. With new advances in technology and instrumentation, some sophisticated procedures are currently available, such as the Whipple procedure, one of the most sophisticated applications of minimally invasive surgery. A review of the literature shows that 146 laparoscopic Whipple procedures have been published worldwide since 1994. The authors analyzed blood loss, mean operating time, hospital stay, conversion rate, mean age, mortality rate, lymph nodes in the pathologic findings, follow up, and complications. Mean age was 59.1 years; mean operating time was 439 min. The average blood loss for the reviewed literature was 143 mL; median hospital stay was 18 days; conversion rate was 46%; number of lymph nodes in the pathologic findings was 19; and mortalities related to the procedure was low, 2 patients (1.3%) and the complication rate was 16% (23/46 patients). Complications included 2 hemorrhages, 4 bowel obstructions, 1 stress ulcer, 1 delay of gastric emptying, 4 pneumonias, and 11 leaks. This review demonstrates that the laparoscopic Whipple procedure is not only feasible but also safe, with low mortality and acceptable rates of complications.

  16. Combined SAFE/SNAP approach to safeguards evaluation

    International Nuclear Information System (INIS)

    Engi, D.; Chapman, L.D.; Grant, F.H.; Polito, J.

    1980-01-01

    The scope of a safeguards evaluation model can efficiently address one of two issues: (1) global safeguards effectiveness or (2) vulnerability analysis for individual scenarios. The Safeguards Automated Facility Evaluation (SAFE) focuses on the first issue, while the Safeguards Network Analysis Procedure (SNAP) is directed towards the second. A combined SAFE/SNAP approach to the problem of safeguards evaluation is described and illustrated through an example. 4 refs

  17. Water chemistry - one of the key technologies for safe and reliable nuclear power plant operation

    International Nuclear Information System (INIS)

    Uchida, S.; Otoha, K.; Ishigure, K.

    2006-01-01

    Full text: Full text: Water chemistry control is one of the key technologies to establish safe and reliable operation of nuclear power plants. Continuous and collaborative efforts of plant manufacturers and plant operator utilities have been focused on optimal water chemistry control, for which, a trio of requirements for water chemistry, a) better reliability of reactor structures and fuels, b) lower occupational exposure, and c) fewer radwaste sources, should be simultaneously satisfied. The research committee related to water chemistry of the Atomic Energy Society of Japan has played important roles to enhance improvement in water chemistry control, to share knowledge and experience with water chemistry among plant operators and manufacturers, to establish common technological bases for plant water chemistry and then to transfer them to the next generation related to water chemistry. Furthermore, the committee has tried to contribute to arranging R and D proposals for further improvement in water chemistry control through road map planning

  18. Safety procedures in operation of inspection and maintenance of pressure reduction and metering stations

    International Nuclear Information System (INIS)

    Villas Boas, Ademar Jose; Biesemeyer, Marco Aurelio R.

    2000-01-01

    Each local Natural Gas Distribution Company in Brazil has its own working procedures for operations of inspection and maintenance on equipment and accessories connected to the gas network. Some of these Companies developed a better elaborated and documented way of working routines, while others only work based on their operators experience. The objective of this work is to create a standard procedure for operations of inspection and maintenance of Pressure Reducing Stations and Metering Stations, mainly the ones concerned to safety aspects. This work has no intention of exhausting all aspects related to this subject but to become the first step to standardize these types of operations among Natural Gas Distribution Companies. (author)

  19. Design, qualification and operation of nuclear rockets for safe Mars missions

    International Nuclear Information System (INIS)

    Buden, D.; Madsen, W.W.; Olson, T.S.; Redd, L.R.

    1993-01-01

    Nuclear thermal propulsion modules planned for use on crew missions to Mars improve mission reliability and overall safety of the mission. This, as well as all other systems, are greatly enhanced if the system specifications take into account safety from design initiation, and operational considerations are well thought through and applied. For instance, the use of multiple engines in the propulsion module can lead to very high system safety and reliability. Operational safety enhancements may include: the use of multiple perigee burns, thus allowing time to ensure that all systems are functioning properly prior to departure from Earth orbit; the ability to perform all other parts of the mission in a degraded mode with little or no degradation of the mission; and the safe disposal of the nuclear propulsion module in a heliocentric orbit out of the ecliptic plane. The standards used to qualify nuclear rockets are one of the main cost drivers of the program. Concepts and systems that minimize cost and risk will rely on use of the element and component levels to demonstrate technology readiness and validation. Subsystem or systems testing then is only needed for verification of performance. Also, these will be the safest concepts because they will be more thoroughly understood and the safety margins will be well established and confirmed by tests

  20. An expert system-based aid for analysis of Emergency Operating Procedures in NPPs

    International Nuclear Information System (INIS)

    Jakubowski, Z.; Beraha, D.

    1996-01-01

    Emergency Operating Procedures (EOPs) generally and an accident management (AM) particularly play a significant part in the safety philosophy on NPPs since many years. A better methodology for development and validation of EOPs is desired. A prototype of an Emergency Operating Procedures Analysis System (EOPAS), which has been developed at GRS, is presented in the paper. The hardware configuration and software organisation of the system is briefly reviewed. The main components of the system such as the knowledge base of an expert system and the engineering simulator are described. (author)

  1. Environmental Sciences Division Toxicology Laboratory standard operating procedures

    International Nuclear Information System (INIS)

    Kszos, L.A.; Stewart, A.J.; Wicker, L.F.; Logsdon, G.M.

    1989-09-01

    This document was developed to provide the personnel working in the Environmental Sciences Division's Toxicology Laboratory with documented methods for conducting toxicity tests. The document consists of two parts. The first part includes the standard operating procedures (SOPs) that are used by the laboratory in conducting toxicity tests. The second part includes reference procedures from the US Environmental Protection Agency document entitled Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Waters to Freshwater Organisms, upon which the Toxicology Laboratory's SOPs are based. Five of the SOPs include procedures for preparing Ceriodaphnia survival and reproduction test. These SOPs include procedures for preparing Ceriodaphnia food (SOP-3), maintaining Ceriodaphnia cultures (SOP-4), conducting the toxicity test (SOP-13), analyzing the test data (SOP-13), and conducting a Ceriodaphnia reference test (SOP-15). Five additional SOPs relate specifically to the fathead minnow (Pimephales promelas) larval survival and growth test: methods for preparing fathead minnow larvae food (SOP-5), maintaining fathead minnow cultures (SOP-6), conducting the toxicity test (SOP-9), analyzing the test data (SOP-12), and conducting a fathead minnow reference test (DOP-14). The six remaining SOPs describe methods that are used with either or both tests: preparation of control/dilution water (SOP-1), washing of glassware (SOP-2), collection and handling of samples (SOP-7), preparation of samples (SOP-8), performance of chemical analyses (SOP-11), and data logging and care of technical notebooks (SOP-16)

  2. Methods and procedures for shielding analyses for the SNS

    International Nuclear Information System (INIS)

    Popova, I.; Ferguson, F.; Gallmeier, F.X.; Iverson, E.; Lu, Wei

    2011-01-01

    In order to provide radiologically safe Spallation Neutron Source operation, shielding analyses are performed according to Oak Ridge National Laboratory internal regulations and to comply with the Code of Federal Regulations. An overview of on-going shielding work for the accelerator facility and neutrons beam lines, methods used for the analyses, and associated procedures and regulations are presented. Methods used to perform shielding analyses are described as well. (author)

  3. Measurement of spatial dose distribution for evaluation operator dose during nero-interventional procedures

    International Nuclear Information System (INIS)

    Han, Su Chul; Hong, Dong Hee

    2016-01-01

    The spatial dose distribution was measured with ionization chamber as preliminary study to evaluate operator dose and to study dose reduction during neuro-interventional procedures. The zone of operators was divided into four area (45, 135, 225, and 315 degree).We supposed that operator exist on the four area and indicated location of critical organs(eyes, breast, gonad). The spatial doses were measured depending on distance( 80, 100, 120, and 140 cm) and location of critical organs. The spatial doses of area of 225 degree were 114.5 mR/h (eyes location), 143.1 mR/h (breast location) and 147 mR/h (gonad location) in 80 cm. When changed location of x-ray generator, spatial dose increased in 18.1±10.5%, averagely. We certified spatial dose in the operator locations, Using the results of this study, It is feasible to protect operator from radiation in neuro-interventional procedures

  4. Measurement of spatial dose distribution for evaluation operator dose during nero-interventional procedures

    Energy Technology Data Exchange (ETDEWEB)

    Han, Su Chul [Division of Medical Radiation Equipment, Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of); Hong, Dong Hee [Dept. of Radiology Science, Far East University, Eumseong (Korea, Republic of)

    2016-09-15

    The spatial dose distribution was measured with ionization chamber as preliminary study to evaluate operator dose and to study dose reduction during neuro-interventional procedures. The zone of operators was divided into four area (45, 135, 225, and 315 degree).We supposed that operator exist on the four area and indicated location of critical organs(eyes, breast, gonad). The spatial doses were measured depending on distance( 80, 100, 120, and 140 cm) and location of critical organs. The spatial doses of area of 225 degree were 114.5 mR/h (eyes location), 143.1 mR/h (breast location) and 147 mR/h (gonad location) in 80 cm. When changed location of x-ray generator, spatial dose increased in 18.1±10.5%, averagely. We certified spatial dose in the operator locations, Using the results of this study, It is feasible to protect operator from radiation in neuro-interventional procedures.

  5. Techniques for preparing flowchart-format emergency operating procedures: Background (Sections 1.0-9.0)

    International Nuclear Information System (INIS)

    Barnes, V.E.; Moore, C.J.; Wieringa, D.R.; Isakson, C.S.; Kono, B.K.; Gruel, R.L.

    1989-01-01

    This two-volume report describes the activities, findings, and recommendations of a project entitled ''Techniques for Presenting Flowchart-Format Emergency Operating Procedures.'' The project team surveyed the literature pertaining to flowcharts, reviewed existing flowchart emergency operating procedures (EOPs), interviewed consultants who produced flowcharts, and interviewed reactor operator licensing examiners about the use of flowcharts in nuclear power plants. This document, and Volume 1 of this report, discusses the use of flowchart-format EOPs in nuclear power plants and presents issue to be addressed in the design and implementation of flowchart EOPs. 66 refs., 76 figs., 2 tabs

  6. JJ Stent Removal under Ultrasound Guidance in Women: It is Simple and Safe.

    Science.gov (United States)

    Amer, Bernard; Gupta, Sandeep; Kanwar, Vijayendra S; Lodh, Bijit; Khumukcham, Somarendra; Akoijam, Kaku Singh

    2014-12-01

    With the increase in number of patients treated for urological problems with endoscopic procedures, the number of patients with JJ stent is also increasing. The amount of workload thus incurred multiplies, even to the point that, sometimes we waste more time in the operating room removing JJ stents than the actual endourological procedures. Here in our institute, we have devised a very simple and effective way of removing JJ stents in women and also determined the efficacy, safety and cost of JJ stent removal under ultrasound guidance in women in comparison to cystoscopic removal. Two hundred women attending the Department of Urology from July 2012 to July 2013 at RIMS hospital were randomly divided into two arms. One hundred women had their JJ stent removed with cystoscope and another 100 women had their JJ stent removed under ultrasound guidance using simple surgical tools available at the hospital. The primary comparative points were waiting time for operating room appointment date, cost of the procedure, time taken for the procedure, discomfort or pain felt by the patient and urethral injuries. In all the parameters, stent removal under ultrasound guidance was significantly better except for urethral injuries where both the procedures had similar outcomes. We concluded that JJ stent removal under ultrasound guidance in women was simple, effective and safe.

  7. Bootstrap-based procedures for inference in nonparametric receiver-operating characteristic curve regression analysis.

    Science.gov (United States)

    Rodríguez-Álvarez, María Xosé; Roca-Pardiñas, Javier; Cadarso-Suárez, Carmen; Tahoces, Pablo G

    2018-03-01

    Prior to using a diagnostic test in a routine clinical setting, the rigorous evaluation of its diagnostic accuracy is essential. The receiver-operating characteristic curve is the measure of accuracy most widely used for continuous diagnostic tests. However, the possible impact of extra information about the patient (or even the environment) on diagnostic accuracy also needs to be assessed. In this paper, we focus on an estimator for the covariate-specific receiver-operating characteristic curve based on direct regression modelling and nonparametric smoothing techniques. This approach defines the class of generalised additive models for the receiver-operating characteristic curve. The main aim of the paper is to offer new inferential procedures for testing the effect of covariates on the conditional receiver-operating characteristic curve within the above-mentioned class. Specifically, two different bootstrap-based tests are suggested to check (a) the possible effect of continuous covariates on the receiver-operating characteristic curve and (b) the presence of factor-by-curve interaction terms. The validity of the proposed bootstrap-based procedures is supported by simulations. To facilitate the application of these new procedures in practice, an R-package, known as npROCRegression, is provided and briefly described. Finally, data derived from a computer-aided diagnostic system for the automatic detection of tumour masses in breast cancer is analysed.

  8. Standing operating procedures for developing acute exposure guideline levels for hazardous chemicals

    National Research Council Canada - National Science Library

    National Research Council (U.S.). Subcommittee on Acute Exposure Guideline Levels

    2001-01-01

    Standing Operating Procedures for Developing Acute Exposure Guideline Levels for Hazardous Chemicals contains a detailed and comprehensive methodology for developing acute exposure guideline levels (AEGLs...

  9. A study on the Safe Operation of RHRS during Shut-Down and Low Power Operations of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Jeon, Moon Hun; Sung, Chang Kyung; Kim, Yang Suk; You, Sun Oh; Joo, In Chul [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    1996-08-01

    The main objective is to perform basic research for safe operation of RHRs, which is an important part in the safety analysis of nuclear reactors during a mid-loop operation of nuclear power plants. To achieve this objective, a series of experiments have been performed to simulate the wave phenomena of countercurrent flow that may occur in the hot legs during a mid-loop operation. The major contents and the scope are as follows, To collect and to analyse existing experimental works and also numerical works which have been carried out using large computer codes. To collect and to analyse existing works on the flow patterns of two-phase flows. To perform a series of experiments to simulate the wave phenomena for the countercurrent two-phase flow in hot legs. To obtain correlations for the interfacial friction factor and the flow patterns for a countercurrent flow from the experimentally measured parameters. To obtain the interfacial friction factor between the two-phases of air-water countercurrent flow in a horizontal pipe, a series of experiments have been performed using two different sections of 0.05 m in diameter, whose lengths are 2 m and 4 m, respectively. The results presented here can be used as the fundamental information to obtain the most important thermal-hydraulic parameters such as flow patterns and interfacial friction factors for air-water two-phase flows, which are necessary for safety analyses and operation of nuclear power plants during a mid-loop operation. 46 refs., 8 tabs., 35 figs., 3 ills. (author)

  10. Operability test procedure for 241-U compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The supply piping to the 241-U Tank Farm is not included in the modification. Modifications to the 241-U-701 compressed air system include installation of a 15 HP Reciprocating Air Compressor, Ingersoll-Rand Model 10T3NLM-E15; an air dryer, Hankinson, Model DH-45; and miscellaneous system equipment and piping (valves, filters, etc.) to meet the design. A newly installed heat pump allows the compressor to operate within an enclosed relatively dust free atmosphere and keeps the compressor room within a standard acceptable temperature range, which makes possible efficient compressor operation, reduces maintenance, and maximizes compressor operating life. This document is an Operability Test Procedure (OTP) which will further verify (in addition to the Acceptance Test Procedure) that the 241-U-701 compressed air system and heat pump operate within their intended design parameters. The activities defined in this OTP will be performed to ensure the performance of the new compressed air system will be adequate, reliable and efficient. Completion of this OTP and sign off of the OTP Acceptance of Test Results is necessary for turnover of the compressed air system from Engineering to Operations

  11. In-situ burn operational procedures development exercises

    International Nuclear Information System (INIS)

    Bitting, K.; Gynther, J.; Drieu, M.; Tidemann, A.; Martin, R.

    2001-01-01

    The United States Coast Guard, the Texas General Land Office and the National Response Corporation conducted three at-sea oil spill exercises in 1999 and 2000 to test and evaluate a variety of methods to perform in-situ burning (ISB) operations at sea. ISB is seldom used during actual responses, particularly in offshore environments because there is no detailed ISB operation plan for specific regional response teams. There is also a lack of sufficient ISB resources, both equipment and trained personnel, that can be mobilized within the limited ISB window-of-opportunity. There is also a misconception regarding the costs and benefits of ISB. For these exercises, the oil slick was simulated with several tons of oranges. The primary objective was to examine the safe, effective and efficient implementation of ISB. The exercises involved the use of actual response vessels, water-cooled fire booms, helicopters and helitorches. Specific manoeuvres were conducted and particular activities were measured. The experimental data was recorded for future use as a planning and training tool. The exercises demonstrated that ISB is a viable and efficient response tool if it is used in the right situation. The biggest short fall of these exercises was the inability to burn real oil on the water (the oranges did not provide enough data). It was concluded that ISB is not always the best tool for every situation. Dispersants and mechanical recovery are also viable options. 1 tab., 6 figs

  12. Development of automated generation system of accidental operating procedures for a PWR

    International Nuclear Information System (INIS)

    Artaud, J.L.

    1991-06-01

    The aim of the ACACIA project is to develop an automated generation system of accident operating procedures for a PWR. This research and development study, common at CEA and EDF, has two objectives: at mean-dated the realization of a validation tool and a procedure generation; at long-dated the dynamic generation of real time procedures. This work is consecrated at the realization of 2 prototypes. These prototypes and the technics used are described in detail. The last chapter explores the perspectives given by this type of tool [fr

  13. The safe transport of radioactive materials

    CERN Document Server

    Gibson, R

    1966-01-01

    The Safe Transport of Radioactive Materials is a handbook that details the safety guidelines in transporting radioactive materials. The title covers the various regulations and policies, along with the safety measures and procedures of radioactive material transport. The text first details the 1963 version of the IAEA regulation for the safe transport of radioactive materials; the regulation covers the classification of radionuclides for transport purposes and the control of external radiation hazards during the transport of radioactive materials. The next chapter deals with concerns in the im

  14. Maintaining the safe operation of U.S. nuclear power plants

    International Nuclear Information System (INIS)

    Skavdahl, R.E.

    1991-01-01

    The more than one hundred nuclear power plants in the U.S. are a vital resource that provides about 20% of the electrical power production. Although about half the plants are more than 15 years old, there is no evidence of age-related deterioration in any of the key indicators of industry performance; indeed, the continuing improvement in all these indicators shows the industry is maturing, not growing old. The Institute for Nuclear Power Operations's performance assessment and training programs have spurred a heavy industry-wide commitment to improved training. These efforts are the key to excellence in the performance of operations and maintenance personnel. The interface between the reactor and the operator has been improved through control room design reviews, the implementation of a Safety Parameter Display System, and emergency procedure guidelines. These improvements ensure that the operators will be able to perform their functions under any circumstances they may encounter. Led by NUMARC, the industry initiative to improve plant maintenance programs incorporates such elements as the INPO performance standards, enhanced monitoring through the use of the Nuclear Plant Reliability Data System, Reliability Centered Maintenance, and improvements in plant technical specifications. These elements bring the latest available technology to plant maintenance programs. Equipment replacements are frequently made to take advantage of improvements in technology. Aside from the performance enhancements they offer, such replacements also serve to keep the plants young. By leveraging their resources through the owners groups, utilities are able to quickly and efficiently solve problems together that they could not afford to attack individually. Even the highly unlikely hypothetical severe accidents are addressed in a systematic fashion through the application of Probabilistic Risk Assessments. 15 figs

  15. Per-Oral Endoscopic Myotomy (POEM) After Previous Laparoscopic Heller Myotomy Is Feasible and Safe in a Porcine Model.

    Science.gov (United States)

    Miles, Luke F; Frelich, Matthew J; Gould, Jon C; Dua, Kulwinder S; Jensen, Eric S; Kastenmeier, Andrew S

    2015-10-01

    We sought to evaluate the feasibility, safety, and difficulty of performing the per-oral endoscopic myotomy (POEM) procedure in the setting of a prior Heller myotomy using a survival porcine model. Four pigs underwent laparoscopic Heller myotomy with Dor partial anterior fundoplication followed by the POEM performed 4 weeks later. Two additional pigs served as controls, undergoing only the POEM. All procedures were completed without complications. The revisional POEM was not significantly more difficult than POEM controls based on procedure time, POEM procedure components, or procedure difficulty scores. Revisional POEM had a longer mean operative time when compared with Heller myotomy (126.0 vs. 83.8 min; PHeller myotomy is safe and feasible in the porcine model and has potential as an option for patients suffering from recurrent or persistent symptoms after failed surgical myotomy.

  16. VISIR: technological infrastructure of an operational service for safe and efficient navigation in the Mediterranean Sea

    OpenAIRE

    G. Mannarini; G. Turrisi; A. D'Anca; M. Scalas; N. Pinardi; G. Coppini; F. Palermo; I. Carluccio; M. Scuro; S. Cretì; R. Lecci; P. Nassisi; L. Tedesco

    2016-01-01

    VISIR (discoVerIng Safe and effIcient Routes) is an operational decision support system (DSS) for optimal ship routing designed and implemented in the frame of the TESSA (TEchnology for Situational Sea Awareness) project. The system is aimed to increase safety and efficiency of navigation through the use of forecast environmental fields and route optimization. VISIR can be accessed through a web interface (www.visir-nav.com) and mobile applications for both iOS and Androi...

  17. The importance of production standard operating procedure in a family business company

    Science.gov (United States)

    Hongdiyanto, C.

    2017-12-01

    Plastic industry is a growing sector, therefore UD X which engage in this business has a great potential to grow as well. The problem faced by this family business company is that no standard operating procedure is used and it lead to problem in the quality and quantity produced. This research is aim to create a production standard operating procedure for UD X. Semistructure interview is used to gather information from respondent to help writer create the SOP. There are four SOP’s created, namely: classifying SOP, sorting SOP, milling SOP and packing SOP. Having SOP will improve the effectiveness of production because employees already know how to work in each stages of production process.

  18. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training

    NARCIS (Netherlands)

    van Det, M.J.; Meijerink, W.J.; Hoff, C.; Middel, B.; Pierie, J.P.

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training

  19. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  20. Structural integrity investigations of feeder pipe ice plugging procedures

    International Nuclear Information System (INIS)

    Flaman, M.T.; Shah, N.N.

    1985-03-01

    A procedure involving the use of a liquid nitrogen cooled heat exchanger to form internal ice plugs in feeder pipes is routinely used in nuclear generating stations. The use of this procedure has caused concerns with regard to the safety of station maintenance personnel, and in regard to the integrity of the feeder pipes. This report describes the results of laboratory stress and pressure measurements which were performed on a feeder pipe section during ice plugging operations to investigate these concerns. From the results of this study, and from the results of previous studies of material behaviour at low temperatures, it has been determined that the ice plugging procedure can be performed on feeder pipes in a safe and effective manner

  1. Operational support of a safe operating envelope for fuel

    International Nuclear Information System (INIS)

    Chapman, T.J.; Gibb, R.A.

    1998-01-01

    The mandate of a station safety analysis group is to ensure that the station is operated and maintained in a manner consistent with the basis for our understanding of the safety consequences of process or human failures. As operating experience has developed an awareness of the significance of fuel manufacture and operating conditions on safety consequences has also grown. This awareness has led to a program that is designed to ensure that these influences are appropriately considered. This paper describes the projects that make up this program. (author)

  2. Operational procedure standard for occurrences involving radioactive materials

    International Nuclear Information System (INIS)

    Piekarz, Leonardo; Rezende, Talita C.; Pinheiro, Christiano J.G.

    2017-01-01

    This study has as objective to analyze more deeply the actions of response to emergencies involving radioactive materials, in the intent to establish a pattern to the actions performed by the military fire fighters of the Military Fire Brigade of Minas Gerais. To met these goals, it has been attempted to analyze the procedures utilized and recommended, nowadays, for the military fire fighters of CBMMG, and through directed studies, to suggest new actions possible to be executed in the local of the emergency in a way that will not expose the garrison to doses of ionizing radiation that may prejudice them. It is a study of bibliographic, exploratory, and also descriptive nature, realized through a qualitative approach. The techniques used for the research were the analysis of institutional documents, norms and other literature produced by renamed entities in the radiologic and biosafety areas. It was then concluded that CBMMG, through simple actions of response, can provide higher quality and safety in the operations involving radiologic accidents, standing out that the implemented actions nowadays are very beneath the capacity of the corporation, due to the lack of knowledge of the matter by the fire fighters. It was proposed, then, that new actions be implemented and instituted as operational procedures to be used on those emergencies, with the objective of provide a higher safety and professionalism in the attendance to emergencies involving radioactive materials. (author)

  3. Operational procedure standard for occurrences involving radioactive materials

    Energy Technology Data Exchange (ETDEWEB)

    Piekarz, Leonardo, E-mail: leonardopbm@yahoo.com.br [Academia de Bombeiros Militar de Minas Gerais, Belo Horizonte, MG (Brazil); Rezende, Talita C.; Pinheiro, Christiano J.G., E-mail: talitacolombi@yahoo.com, E-mail: christrieste@yahoo.it [Universidade Federal do Espirito Santo (CCA/UFES), Alegre, ES (Brazil). Programa de Pós-Graduação em Engenharia Química

    2017-07-01

    This study has as objective to analyze more deeply the actions of response to emergencies involving radioactive materials, in the intent to establish a pattern to the actions performed by the military fire fighters of the Military Fire Brigade of Minas Gerais. To met these goals, it has been attempted to analyze the procedures utilized and recommended, nowadays, for the military fire fighters of CBMMG, and through directed studies, to suggest new actions possible to be executed in the local of the emergency in a way that will not expose the garrison to doses of ionizing radiation that may prejudice them. It is a study of bibliographic, exploratory, and also descriptive nature, realized through a qualitative approach. The techniques used for the research were the analysis of institutional documents, norms and other literature produced by renamed entities in the radiologic and biosafety areas. It was then concluded that CBMMG, through simple actions of response, can provide higher quality and safety in the operations involving radiologic accidents, standing out that the implemented actions nowadays are very beneath the capacity of the corporation, due to the lack of knowledge of the matter by the fire fighters. It was proposed, then, that new actions be implemented and instituted as operational procedures to be used on those emergencies, with the objective of provide a higher safety and professionalism in the attendance to emergencies involving radioactive materials. (author)

  4. From Planetary Boundaries to national fair shares of the global safe operating space — How can the scales be bridged?

    NARCIS (Netherlands)

    Häyhä, Tiina; Lucas, Paul L.|info:eu-repo/dai/nl/272607444; van Vuuren, Detlef P.|info:eu-repo/dai/nl/11522016X; Cornell, Sarah E.; Hoff, Holger

    2016-01-01

    The planetary boundaries framework proposes quantitative global limits to the anthropogenic perturbation of crucial Earth system processes, and thus marks out a planetary safe operating space for human activities. Yet, decisions regarding resource use and emissions are mostly made at less aggregated

  5. Operability test procedure for the Rotary Mode Core Sampling System Exhausters 3 and 4

    International Nuclear Information System (INIS)

    WSaldo, E.J.

    1995-01-01

    This document provides a procedure for performing operability testing of the Rotary Mode Core Sampling System Exhausters 3 ampersand 4. Upon completion of testing activities an operability testing report will be issued

  6. The BWR [Boiling Water Reactor] Emergency Operating Procedures Tracking System (EOPTS): Evaluation by control-room operating crews

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Orvis, D.D.; Spurgin, J.P.; Luna, C.J.

    1990-05-01

    This report presents the results of a project sponsored by the Electric Power Research Institute (EPRI) and Taiwan Power Company (TPC) and conducted by APG and TPC to perform evaluation of the Emergency Operating Procedures Tracking System (EOPTS). The EOPTS is an expert system employing artificial intelligence techniques developed by EPRI for Boiling Water Reactor (BWR) plants based on emergency operating procedures (EOPs). EOPTS is a computerized decision aid used to assist plant operators in efficient and reliable use of EOPs. The main objective of this project was to evaluate the EOPTS and determine how an operator aid of this type could noticeably improve the response time and the reliability of control room crews to multi-failure scenarios. A secondary objective was to collect data on how crew performance was affected. Experiments results indicate that the EOPTS measurably improves crew performance over crews using the EOP flow charts. Time-comparison measurements indicate that crews using the EOPTS perform required actions more quickly than do those using the flowcharts. The results indicate that crews using the EOPTS are not only faster and more consistent in their actions but make fewer errors. In addition, they have a higher likelihood of recovering from the errors that they do make. Use of the EOPTS in the control room should result in faster termination and mitigation of accidents and reduced risk of power plant operations. Recommendations are made towards possible applications of the EOPTS to operator training and evaluation, and for the applicability of the evaluation methodology developed for this project to the evaluation of similar operator aides. 17 refs., 14 figs., 14 tabs

  7. Guidelines for the preparation of emergency operating procedures. Resolution of comments on NUREG-0799

    International Nuclear Information System (INIS)

    1982-08-01

    The purpose of this document is to identify the elements necessary for utilities to prepare and implement a program of Emergency Operating Procedures (EOPs) for use by control room personnel to assist in mitigating the consequences of a broad range of accidents and multiple equipment failures. This document applies only to the EOPs so designated; it does not address emergency preparedness or emergency planning. It also represents the resolution of comments on NUREG-0799, Draft Criteria for Preparation of Emergency Operating Procedures

  8. Manual for the GAW Precipitation Chemistry Programme: Guidelines, Data Quality Objectives and Standard Operating Procedures

    National Research Council Canada - National Science Library

    Allan, Mary A

    2004-01-01

    This is a manual for the Global Atmosphere Watch Precipitation Chemistry (GAW-PC) Programme. Where possible, it describes standard operating procedures and otherwise provides guidance on methods and procedures...

  9. Feedback control of a primary pump for safe and stable operation of a PIUS-type reactor

    International Nuclear Information System (INIS)

    Tasaka, K.; Imai, S.; Masaoka, H.; Tamaki, M.; Kukita, Y.

    1993-01-01

    A new automatic pump speed control system by using a measurement of the temperature distribution in the lower density lock is proposed for the PIUS-type reactor. This control system maintains the fluid temperature at the axial center of the lower density lock at the average of the fluid temperatures below and above the density lock in order to prevent the poison water from penetrating into the core during normal operation. The effectiveness of this control system was successfully confirmed by a series of experiments such as start-up and power ramping tests for the stable normal operation and a loss-of-feedwater test for the safe shutdown in an accident condition, using a small scale atmospheric pressure test loop which simulated the PIUS principle. (orig.)

  10. Asymptotically Safe Standard Model Extensions arXiv

    CERN Document Server

    Pelaggi, Giulio Maria; Salvio, Alberto; Sannino, Francesco; Smirnov, Juri; Strumia, Alessandro

    We consider theories with a large number NF of charged fermions and compute the renormalisation group equations for the gauge, Yukawa and quartic couplings resummed at leading order in NF. We construct extensions of the Standard Model where SU(2) and/or SU(3) are asymptotically safe. When the same procedure is applied to the Abelian U(1) factor, we find that the Higgs quartic can not be made asymptotically safe and stay perturbative at the same time.

  11. arXiv Asymptotically Safe Standard Model Extensions?

    CERN Document Server

    Pelaggi, Giulio Maria; Salvio, Alberto; Sannino, Francesco; Smirnov, Juri; Strumia, Alessandro

    2018-05-15

    We consider theories with a large number NF of charged fermions and compute the renormalization group equations for the gauge, Yukawa and quartic couplings resummed at leading order in 1/NF. We construct extensions of the standard model where SU(2) and/or SU(3) are asymptotically safe. When the same procedure is applied to the Abelian U(1) factor, we find that the Higgs quartic can not be made asymptotically safe and stay perturbative at the same time.

  12. Step Complexity Measure for Emergency Operating Procedures - Determining Weighting Factors

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Kim, Jaewhan; Ha, Jaejoo

    2003-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human error has been regarded as the primary cause of many events. Therefore, to ensure system safety, extensive effort has been made to identify the significant factors that can cause human error. According to related studies, written manuals or operating procedures are revealed as one of the important factors, and the understandability is pointed out as one of the major reasons for procedure-related human errors.Many qualitative checklists have been suggested to evaluate emergency operating procedures (EOPs) of NPPs so as to minimize procedure-related human errors. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is indispensable.From this necessity, Park et al. suggested the step complexity (SC) measure to quantify the complexity of procedural steps included in EOPs. To verify the appropriateness of the SC measure, averaged step performance time data obtained from emergency training records of the loss-of-coolant accident (LOCA) and the excess steam demand event were compared with estimated SC scores. However, although averaged step performance time data and estimated SC scores show meaningful correlation, some important issues such as determining proper weighting factors have to be clarified to ensure the appropriateness of the SC measure. These were not properly dealt with due to a lack of backup data.In this paper, to resolve one of the important issues, emergency training records are additionally collected and analyzed in order to determine proper weighting factors. The total number of collected records is 66, and the training scenarios cover five emergency conditions including the LOCA, the steam generator tube rupture, the loss of all feedwater, the loss of off-site power, and the station blackout. From these records, average step performance time data are retrieved, and new

  13. Safe Operation of Nuclear Power Plants: Impacts of Human and Organisational Factors and Emerging Technologies

    International Nuclear Information System (INIS)

    2001-01-01

    In co-operation with the OECD Nuclear Energy Agency (NEA), the Halden Reactor Project organised a Summer School on ''Safe Operation of Nuclear Power Plants: Impacts of Human and Organisational Factors and Emerging Technologies'' in the period August 27-August 31, 2001. The Summer School was intended for scientists, engineers and technicians working for nuclear installations, engineering companies, industry and members of universities and research institutes, who wanted to broaden their nuclear background by getting acquainted with Man-Technology-Organisation-related subjects and issues. The Summer School should also serve to transfer knowledge to the ''young generation'' in the nuclear field. The following presentations were given: (1) Overview of the Nuclear Community and Current issues, (2) The Elements of Safety Culture; Evaluation of Events, (3) Quality Management (QM), (4) Probabilistic Risk Assessment (PSA), (5) Human Behaviour from the Viewpoint of Industrial Psychology, (6) Technical tour of the Halden Project Experimental Facilities, (7) Human Factors in Control Room Design, (8) Computerised Operator Support Systems (COSSs) and (9) Artificial Intelligence; a new Approach. Most of the contributions are overhead figures from spoken lectures

  14. Safe Operation of Nuclear Power Plants: Impacts of Human and Organisational Factors and Emerging Technologies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    In co-operation with the OECD Nuclear Energy Agency (NEA), the Halden Reactor Project organised a Summer School on ''Safe Operation of Nuclear Power Plants: Impacts of Human and Organisational Factors and Emerging Technologies'' in the period August 27-August 31, 2001. The Summer School was intended for scientists, engineers and technicians working for nuclear installations, engineering companies, industry and members of universities and research institutes, who wanted to broaden their nuclear background by getting acquainted with Man-Technology-Organisation-related subjects and issues. The Summer School should also serve to transfer knowledge to the ''young generation'' in the nuclear field. The following presentations were given: (1) Overview of the Nuclear Community and Current issues, (2) The Elements of Safety Culture; Evaluation of Events, (3) Quality Management (QM), (4) Probabilistic Risk Assessment (PSA), (5) Human Behaviour from the Viewpoint of Industrial Psychology, (6) Technical tour of the Halden Project Experimental Facilities, (7) Human Factors in Control Room Design, (8) Computerised Operator Support Systems (COSSs) and (9) Artificial Intelligence; a new Approach. Most of the contributions are overhead figures from spoken lectures.

  15. Safety Precautions and Operating Procedures in an (A)BSL-4 Laboratory: 2. General Practices.

    Science.gov (United States)

    Mazur, Steven; Holbrook, Michael R; Burdette, Tracey; Joselyn, Nicole; Barr, Jason; Pusl, Daniela; Bollinger, Laura; Coe, Linda; Jahrling, Peter B; Lackemeyer, Matthew G; Wada, Jiro; Kuhn, Jens H; Janosko, Krisztina

    2016-10-03

    Work in a biosafety level 4 (BSL-4) containment laboratory requires time and great attention to detail. The same work that is done in a BSL-2 laboratory with non-high-consequence pathogens will take significantly longer in a BSL-4 setting. This increased time requirement is due to a multitude of factors that are aimed at protecting the researcher from laboratory-acquired infections, the work environment from potential contamination and the local community from possible release of high-consequence pathogens. Inside the laboratory, movement is restricted due to air hoses attached to the mandatory full-body safety suits. In addition, disinfection of every item that is removed from Class II biosafety cabinets (BSCs) is required. Laboratory specialists must be trained in the practices of the BSL-4 laboratory and must show high proficiency in the skills they are performing. The focus of this article is to outline proper procedures and techniques to ensure laboratory biosafety and experimental accuracy using a standard viral plaque assay as an example procedure. In particular, proper techniques to work safely in a BSL-4 environment when performing an experiment will be visually emphasized. These techniques include: setting up a Class II BSC for experiments, proper cleaning of the Class II BSC when finished working, waste management and safe disposal of waste generated inside a BSL-4 laboratory, and the removal of inactivated samples from inside a BSL-4 laboratory to the BSL-2 laboratory.

  16. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  17. Administration in an operating plant

    International Nuclear Information System (INIS)

    Staebler, K.

    1977-01-01

    The importance of strict administrative procedures in the daily work is being demonstrated by commenting on events that occured in the operation of German nuclear power plants. The procedure for working in an area of the plant (pressurized medium, high-radioactive level, explosive of flammable mediums), where special measures for safe working have to be taken, is discussed in detail. The administrative problems during refuelling time are further on mentioned, especially the problems connected with administering more than 1,000 people with respect to health protection and sabotage protection. Some general comments on the influences from external causes (authorities, courts, etc.) are given. (orig./ORU) [de

  18. Evolution of the Whipple procedure at the Massachusetts General Hospital.

    Science.gov (United States)

    Fernández-del Castillo, Carlos; Morales-Oyarvide, Vicente; McGrath, Deborah; Wargo, Jennifer A; Ferrone, Cristina R; Thayer, Sarah P; Lillemoe, Keith D; Warshaw, Andrew L

    2012-09-01

    Since Allen O. Whipple published his seminal paper in 1935, the procedure that bears his name has been performed widely throughout the world and is now a common operation in major medical centers. The goal of this study was to investigate the evolution of pancreatoduodenectomy at the Massachusetts General Hospital (MGH). We sought to identify all pancreatoduodenectomies performed at the MGH since 1935. Cases were obtained from a computerized database, hospital medical records, and the MGH historical archive. Demographics, diagnosis, intraoperative variables and short-term surgical outcomes were recorded. The first pancreatoduodenectomy at the MGH was carried out in 1941; since then, 2,050 Whipple procedures have been performed. Pancreatic ductal adenocarcinoma was the most frequent indication (36%). Pylorus preservation has been the most important variation in technique, accounting for 45% of Whipple procedures in the 1980s; observation of frequent delayed gastric emptying after this procedure led to decline in its use. Pancreatic fistula was the most frequent complication (13%). Operative blood replacement and reoperation rates have decreased markedly over time; the most frequent indication for reoperation was intra-abdominal bleeding. Mortality has decreased from 45% to 0.8%, with sepsis and hypovolemic shock being the most frequent causes of death. Mean duration of hospital stay has decreased from >30 to 9.5 days, along with an increasing readmission rate (currently 19%). The Whipple procedure in the 21st century is a well-established operation. Improvements in operative technique and perioperative care have contributed in making it a safe operation that continues evolving. Copyright © 2012 Mosby, Inc. All rights reserved.

  19. Administrative and managerial controls for the operation of nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Guidelines are provided for the administrative and managerial controls necessary for the safe and efficient operation of nuclear fuel reprocessing plants. Topics covered include: administrative organization; review and audit; facility administrative policies and procedures; and tests and inspections. Recognizing that administrative practices vary among organizations operating nuclear fuel reprocessing plants, the standard incorporates flexibility that provides for compliance by any organization

  20. Curiosity's Autonomous Surface Safing Behavior Design

    Science.gov (United States)

    Neilson, Tracy A.; Manning, Robert M.

    2013-01-01

    The safing routines on all robotic deep-space vehicles are designed to put the vehicle in a power and thermally safe configuration, enabling communication with the mission operators on Earth. Achieving this goal is made a little more difficult on Curiosity because the power requirements for the core avionics and the telecommunication equipment exceed the capability of the single power source, the Multi-Mission Radioisotope Thermoelectric Generator. This drove the system design to create an operational mode, called "sleep mode", where the vehicle turns off most of the loads in order to charge the two Li-ion batteries. The system must keep the vehicle safe from over-heat and under-heat conditions, battery cell failures, under-voltage conditions, and clock failures, both while the computer is running and while the system is sleeping. The other goal of a safing routine is to communicate. On most spacecraft, this simply involves turning on the receiver and transmitter continuously. For Curiosity, Earth is above the horizon only a part of the day for direct communication to the Earth, and the orbiter overpass opportunities only occur a few times a day. The design must robustly place the Rover in a communicable condition at the correct time. This paper discusses Curiosity's autonomous safing behavior and describes how the vehicle remains power and thermally safe while sleeping, as well as a description of how the Rover communicates with the orbiters and Earth at specific times.

  1. Percutaneous tracheostomy in patients with cervical spine fractures--feasible and safe.

    Science.gov (United States)

    Ben Nun, Alon; Orlovsky, Michael; Best, Lael Anson

    2006-08-01

    The aim of this study is to evaluate the short and long-term results of percutaneous tracheostomy in patients with documented cervical spine fracture. Between June 2000 and September 2005, 38 consecutive percutaneous tracheostomy procedures were performed on multi-trauma patients with cervical spine fracture. Modified Griggs technique was employed at the bedside in the general intensive care department. Staff thoracic surgeons and anesthesiologists performed all procedures. Demographics, anatomical conditions, presence of co-morbidities and complication rates were recorded. The average operative time was 10 min (6-15). Two patients had minor complications. One patients had minor bleeding (50 cc) and one had mild cellulitis. Nine patients had severe paraparesis or paraplegia prior to the PCT procedure and 29 were without neurological damage. There was no PCT related neurological deterioration. Twenty-eight patients were discharged from the hospital, 21 were decannulated. The average follow-up period was 18 months (1-48). There was no delayed, procedure related, complication. These results demonstrate that percutaneous tracheostomy is feasible and safe in patients with cervical spine fracture with minimal short and long-term morbidity. We believe that percutaneous tracheostomy is the procedure of choice for patients with cervical spine fracture who need prolonged ventilatory support.

  2. Allowing variance may enlarge the safe operating space for exploited ecosystems.

    Science.gov (United States)

    Carpenter, Stephen R; Brock, William A; Folke, Carl; van Nes, Egbert H; Scheffer, Marten

    2015-11-17

    Variable flows of food, water, or other ecosystem services complicate planning. Management strategies that decrease variability and increase predictability may therefore be preferred. However, actions to decrease variance over short timescales (2-4 y), when applied continuously, may lead to long-term ecosystem changes with adverse consequences. We investigated the effects of managing short-term variance in three well-understood models of ecosystem services: lake eutrophication, harvest of a wild population, and yield of domestic herbivores on a rangeland. In all cases, actions to decrease variance can increase the risk of crossing critical ecosystem thresholds, resulting in less desirable ecosystem states. Managing to decrease short-term variance creates ecosystem fragility by changing the boundaries of safe operating spaces, suppressing information needed for adaptive management, cancelling signals of declining resilience, and removing pressures that may build tolerance of stress. Thus, the management of variance interacts strongly and inseparably with the management of resilience. By allowing for variation, learning, and flexibility while observing change, managers can detect opportunities and problems as they develop while sustaining the capacity to deal with them.

  3. Modified Sleeve Technique in Aortic Valve-Sparing Operation for Marfan Syndrome.

    Science.gov (United States)

    Wu, Yung-Szu; Hsieh, Shih-Rong; Wang, Chung-Chi; Tsai, Chung-Lin

    2018-03-22

    We devised a simple modification of the Florida Sleeve procedure to perform aortic valve-sparing surgery. This technique is simple, quick, effective, and safe. We used this technique in operations performed on two young patients with Marfan syndrome. The initial and short-term results were satisfactory.

  4. Identification of Success Criteria for Automated Function Using Feed and Bleed Operation

    International Nuclear Information System (INIS)

    Kim, Bo Gyung; Kim, Sang Ho; Kang, Hyun Gook; Yoon, Ho Joon

    2013-01-01

    Since NPP has lots of functions and systems, operated procedure is much complicated and the chance of human error to operate the safety systems is quite high. In the case of large break loss of coolant accident (LBLOCA) and station black out (SBO), the dependency of operator is very low. However, when many mitigation systems are still available, operators have several choices to mitigate the accident and the human error can be increased more. To reduce the operator's workload and perform the operation accurate after the accident, automated function for safe cooldown based on the feed and bleed (F and B) operation was suggested. The automated function can predict whether the plant will be safe after the automated function is initiated, and perform the safety functions automatically. To expect the success of cooldown, success criteria should be identified. To perform the operation accurately after the accident, the automated function for safe cooldown based on the F and B operation is suggested. To expect the success of cooldown, sequence of RCS situation when heat removal by secondary system fails is identified. Based on the sequence of RCS situation, four levels of necessity of F and B operation are classified. To obtain the boundary of levels, the TH analysis will be performed

  5. TVT-Exact and midurethral sling (SLING-IUFT) operative procedures: a randomized study.

    Science.gov (United States)

    Aniuliene, Rosita; Aniulis, Povilas; Skaudickas, Darijus

    2015-01-01

    The aim of the study is to compare results, effectiveness and complications of TVT exact and midurethral sling (SLING-IUFT) operations in the treatment of female stress urinary incontinence (SUI). A single center nonblind, randomized study of women with SUI who were randomized to TVT-Exact and SLING-IUFT was performed by one surgeon from April 2009 to April 2011. SUI was diagnosed on coughing and Valsalva test and urodynamics (cystometry and uroflowmetry) were assessed before operation and 1 year after surgery. This was a prospective randomized study. The follow up period was 12 months. 76 patients were operated using the TVT-Exact operation and 78 patients - using the SLING-IUFT operation. There was no statistically significant differences between groups for BMI, parity, menopausal status and prolapsed stage (no patients had cystocele greater than stage II). Mean operative time was significantly shorter in the SLING-IUFT group (19 ± 5.6 min.) compared with the TVT-Exact group (27 ± 7.1 min.). There were statistically significant differences in the effectiveness of both procedures: TVT-Exact - at 94.5% and SLING-IUFT - at 61.2% after one year. Hospital stay was statistically significantly shorter in the SLING-IUFT group (1. 2 ± 0.5 days) compared with the TVT-Exact group (3.5 ± 1.5 days). Statistically significantly fewer complications occurred in the SLING-IUFT group. the TVT-Exact and SLING-IUFT operations are both effective for surgical treatment of female stress urinary incontinence. The SLING-IUFT involved a shorter operation time and lower complications rate., the TVT-Exact procedure had statistically significantly more complications than the SLING-IUFT operation, but a higher effectiveness.

  6. Compliant Task Execution and Learning for Safe Mixed-Initiative Human-Robot Operations

    Science.gov (United States)

    Dong, Shuonan; Conrad, Patrick R.; Shah, Julie A.; Williams, Brian C.; Mittman, David S.; Ingham, Michel D.; Verma, Vandana

    2011-01-01

    We introduce a novel task execution capability that enhances the ability of in-situ crew members to function independently from Earth by enabling safe and efficient interaction with automated systems. This task execution capability provides the ability to (1) map goal-directed commands from humans into safe, compliant, automated actions, (2) quickly and safely respond to human commands and actions during task execution, and (3) specify complex motions through teaching by demonstration. Our results are applicable to future surface robotic systems, and we have demonstrated these capabilities on JPL's All-Terrain Hex-Limbed Extra-Terrestrial Explorer (ATHLETE) robot.

  7. Safety Precautions and Operating Procedures in an (A)BSL-4 Laboratory: 4. Medical Imaging Procedures.

    Science.gov (United States)

    Byrum, Russell; Keith, Lauren; Bartos, Christopher; St Claire, Marisa; Lackemeyer, Matthew G; Holbrook, Michael R; Janosko, Krisztina; Barr, Jason; Pusl, Daniela; Bollinger, Laura; Wada, Jiro; Coe, Linda; Hensley, Lisa E; Jahrling, Peter B; Kuhn, Jens H; Lentz, Margaret R

    2016-10-03

    Medical imaging using animal models for human diseases has been utilized for decades; however, until recently, medical imaging of diseases induced by high-consequence pathogens has not been possible. In 2014, the National Institutes of Health, National Institute of Allergy and Infectious Diseases, Integrated Research Facility at Fort Detrick opened an Animal Biosafety Level 4 (ABSL-4) facility to assess the clinical course and pathology of infectious diseases in experimentally infected animals. Multiple imaging modalities including computed tomography (CT), magnetic resonance imaging, positron emission tomography, and single photon emission computed tomography are available to researchers for these evaluations. The focus of this article is to describe the workflow for safely obtaining a CT image of a live guinea pig in an ABSL-4 facility. These procedures include animal handling, anesthesia, and preparing and monitoring the animal until recovery from sedation. We will also discuss preparing the imaging equipment, performing quality checks, communication methods from "hot side" (containing pathogens) to "cold side," and moving the animal from the holding room to the imaging suite.

  8. Technical support for nuclear power operations

    International Nuclear Information System (INIS)

    1999-04-01

    This report prepared by the group of senior experts from nuclear operating organizations in Member states, addresses the problem of improving the operating performance of nuclear power plants. Safe and reliable operation is essential for strengthening the viability of nuclear power in the increasingly competitive market of electric power. Basic principles and requirements concerning technical procedures and developed practices are discussed. Report reflects the best current international practices and presents those management initiatives that go beyond the mandated regulatory compliance and could lead to enhancement od operational safety and improved plant performance. By correlating experiences and presenting collective effective practices it is meant to assist nuclear power plant managers in achieving improvement in operation through the contribution of effective technical support

  9. Computerisation of procedures. Lessons learned and future perspectives

    International Nuclear Information System (INIS)

    O'Hara, J.; Pirus, D.; Nilsen, S.; Bisio, R.; Hulsund, J.-E.; Zhang, W.

    2003-07-01

    The computerisation of the procedures has been investigated for several years. Even though guidelines for such computerisation have been proposed, there is a need to extend and revise these guidelines. In this report, we look at what has been achieved so far, both within the Halden Project as well as within other organisations related to nuclear power plants. These experiences are often related to testing of particular computerised procedure systems either in research laboratories or in nuclear utilities. These activities have accumulated a body of general knowledge on the subject, as documented in other 'lessons learned' reports of the past. This report will extend this accepted body of knowledge. Furthermore, we identify the unresolved problems that need to be further studied to make usable computerised procedures for the future. The report identifies selected qualities that should be reinforced to make computerised procedure systems better. In particular, the integration aspect is emphasised. A flexible integration with the operator tasks and the remaining interfaces of the control room is important. Unless this integration is accomplished, the computerised procedures will not be functional. Another aspect of integration is combination with other systems inclusive those systems that deal with the plant documentation, electronic or paper based. This kind of integration is important to the safe and reliable operation of the plant. Good integration with plant documentation is instrumental in creating reliable QA of the procedures that covers the whole life cycle of the procedure. (Author). 48 refs., 12 figs., 2 tabs

  10. Endoscopic third ventriculostomy is a safe and effective procedure for the treatment of Blake's pouch cyst

    Directory of Open Access Journals (Sweden)

    Carlos Vicente Brusius

    2013-08-01

    Full Text Available OBJECTIVE: Blake's pouch cyst (BPC is a midline cystic malformation of the posterior fossa, within Dandy-Walker's complex (DWC, often associated with hydrocephalus. Endoscopic third ventriculostomy (ETV has been an alternative to conventional methods for BPC treatment. This study aimed at reporting our experience with ETV in a series of patients with BPC. METHODS: Of 33 patients diagnosed with midline posterior fossa cyst, 26 met the protocol criteria for DWC, and eight subjects with BPC were selected (aged one month to two years old. All cases were treated with ETV. RESULTS: Five patients were male; and three were prenatally diagnosed. They had hydrocephalus and motor deficiencies. Motor assessment at a five-year follow-up yielded normal findings. All patients improved, and only one had residual cognitive dysfunction, despite overall neurological improvement. There were no complications. CONCLUSIONS: ETV was a safe and effective procedure, reducing risks and morbidity associated with open surgery and shunt-related problems.

  11. Spinal anesthesia for inguinal hernia repair in infants: a feasible and safe method even in emergency cases.

    Science.gov (United States)

    Lambertz, A; Schälte, G; Winter, J; Röth, A; Busch, D; Ulmer, T F; Steinau, G; Neumann, U P; Klink, C D

    2014-10-01

    Inguinal hernia repair is the most frequently performed surgical procedure in infants and children. Especially in premature infants, prevalence reaches up to 30% in coincidence with high rates of incarceration during the first year of life. These infants carry an increased risk of complications due to general anesthesia. Thus, spinal anesthesia is a topic of growing interest for this group of patients. We hypothesized that spinal anesthesia is a feasible and safe option for inguinal hernia repair in infants even at high risk and cases of incarceration. Between 2003 and 2013, we operated 100 infants younger than 6 months with inguinal hernia. Clinical data were collected prospectively and retrospectively analyzed. Patients were divided into two groups depending on anesthesia procedure (spinal anesthesia, Group 1 vs. general anesthesia, Group 2). Spinal anesthesia was performed in 69 infants, and 31 infants were operated in general anesthesia, respectively. In 7 of these 31 infants, general anesthesia was chosen because of lumbar puncture failure. Infants operated in spinal anesthesia were significantly smaller (54 ± 4 vs. 57 ± 4 cm; p = 0.001), had a lower body weight (4,047 ± 1,002 vs. 5,327 ± 1,376 g; p emergent incarcerated hernia repairs were performed in spinal anesthesia (p = 0.429). Spinal anesthesia is a feasible and safe option for inguinal hernia repair in infants, especially in high-risk premature infants and in cases of hernia incarceration.

  12. Rancang Bangun Document Management System Untuk Mengelola Dokumen Standart Operational Procedure

    Directory of Open Access Journals (Sweden)

    I Putu Susila Handika

    2017-09-01

    Standard Operational Procedure (SOP is one important document in a company because it is useful to improve the quality of the company. PT. Global Retailindo Pratama is one of the companies engaged in retail that using standard of quality management ISO 9001: 2008. Currently the management of SOP documents at PT. Global Retailindo Pratama still use manual way. Manual way cause some problems such as the search process and document distribution process takes quite a long time. This research aims to design and build Document Management System to manage SOP documents. The system development model used in this research is prototyping model. This application is built in web-based with PHP as programming language. Testing the application using Blak Box Testing and Usability Testing shows that the Document Management System can run in accordance with the needs and can be used easily so that the process of document management SOP becomes faster. Keywords: Document Management System, Standart Operational Procedure, Information System, PHP.

  13. An XML Representation for Crew Procedures

    Science.gov (United States)

    Simpson, Richard C.

    2005-01-01

    NASA ensures safe operation of complex systems through the use of formally-documented procedures, which encode the operational knowledge of the system as derived from system experts. Crew members use procedure documentation on the ground for training purposes and on-board space shuttle and space station to guide their activities. Investigators at JSC are developing a new representation for procedures that is content-based (as opposed to display-based). Instead of specifying how a procedure should look on the printed page, the content-based representation will identify the components of a procedure and (more importantly) how the components are related (e.g., how the activities within a procedure are sequenced; what resources need to be available for each activity). This approach will allow different sets of rules to be created for displaying procedures on a computer screen, on a hand-held personal digital assistant (PDA), verbally, or on a printed page, and will also allow intelligent reasoning processes to automatically interpret and use procedure definitions. During his NASA fellowship, Dr. Simpson examined how various industries represent procedures (also called business processes or workflows), in areas such as manufacturing, accounting, shipping, or customer service. A useful method for designing and evaluating workflow representation languages is by determining their ability to encode various workflow patterns, which depict abstract relationships between the components of a procedure removed from the context of a specific procedure or industry. Investigators have used this type of analysis to evaluate how well-suited existing workflow representation languages are for various industries based on the workflow patterns that commonly arise across industry-specific procedures. Based on this type of analysis, it is already clear that existing workflow representations capture discrete flow of control (i.e., when one activity should start and stop based on when other

  14. Reactive, Safe Navigation for Lunar and Planetary Robots

    Science.gov (United States)

    Utz, Hans; Ruland, Thomas

    2008-01-01

    When humans return to the moon, Astronauts will be accompanied by robotic helpers. Enabling robots to safely operate near astronauts on the lunar surface has the potential to significantly improve the efficiency of crew surface operations. Safely operating robots in close proximity to astronauts on the lunar surface requires reactive obstacle avoidance capabilities not available on existing planetary robots. In this paper we present work on safe, reactive navigation using a stereo based high-speed terrain analysis and obstacle avoidance system. Advances in the design of the algorithms allow it to run terrain analysis and obstacle avoidance algorithms at full frame rate (30Hz) on off the shelf hardware. The results of this analysis are fed into a fast, reactive path selection module, enforcing the safety of the chosen actions. The key components of the system are discussed and test results are presented.

  15. Ketamine. A solution to procedural pain in burned children.

    Science.gov (United States)

    Groeneveld, A; Inkson, T

    1992-09-01

    Our experience has shown ketamine to be a safe and effective method of providing pain relief during specific procedures in burned children. It renders high doses of narcotics unnecessary and offers children the benefit of general anesthesia without the requirement of endotracheal intubation and a trip to the operating room. The response of parents and staff to the use of ketamine has been positive. Parents often experience feelings of guilt following injury to a child and are eager to employ methods that reduce their child's pain. So far, no parent has refused the administration of ketamine; some have even asked that it be used during subsequent procedures on their child. With adequate pre-procedure teaching, parents are prepared for the possible occurrence of emergent reactions and can assist in reorienting the child during recovery. Staff have found that the stress of doing painful procedures on children is reduced when ketamine is used. The procedures tend to be quicker and the predicament of working on a screaming, agitated child is eliminated. At the same time, nursing staff have had to get used to the nystagmic gaze of the children and accept that these patients are truly anesthetized even though they might move and talk. Despite the success we and others have had with ketamine, several questions about its use in burn patients remain unanswered. The literature does not answer such questions as: Which nursing measures reduce the incidence of emergent reactions? How many ketamine anesthetics can safely be administered to one individual? How does the frequency of administration relate to tolerance in a burn patient? Are there detrimental effects of frequent or long-term use? Clearly, an understanding of these questions is necessary to determine the safe boundaries of ketamine use in burn patients. Ketamine is not a panacea for the problem of pain in burned children. But it is one means of managing procedural pain, which is, after all, a significant clinical

  16. Development to requirements for a procedures software tool

    International Nuclear Information System (INIS)

    Yasutake, J.Y.; Hachiro Isoda

    1993-01-01

    In 1989, the Electric Power Research Institute (EPRI) and the Central Research Institute of the Electric Power Industry (CRIEPI) in Japan initiated a joint research program to investigate various interventions to reduce personnel errors and inefficiencies in the maintenance of nuclear power plants. This program, consisting of several interrelated projects, was initiated because of the mutual recognition of the importance of the human element in the efficient and safe operation of utilities and the continuing need to enhance personnel performance to sustain plant safety and availability. This paper summarizes one of the projects, jointly funded by EPRI and CRIEPI, to analyze the requirements for, and prepare a functional description of, a procedures software tool (PST). The primary objective of this project was to develop a description of the features and functions of a software tool that would help procedure writers to improve the quality of maintenance and testing procedures, thereby enhancing the performance of both procedure writers and maintenance personnel

  17. Robot-assisted laparoscopic (RAL) procedures in general surgery.

    Science.gov (United States)

    Alimoglu, Orhan; Sagiroglu, Julide; Atak, Ibrahim; Kilic, Ali; Eren, Tunc; Caliskan, Mujgan; Bas, Gurhan

    2016-09-01

    Robotics was introduced in clinical practice more than two decades ago, and it has gained remarkable popularity for a wide variety of laparoscopic procedures. We report our results of robot-assisted laparoscopic surgery (RALS) in the most commonly applied general surgical procedures. Ninety seven patients underwent RALS from 2009 to 2012. Indications for RALS were cholelithiasis, gastric carcinoma, splenic tumors, colorectal carcinoma, benign colorectal diseases, non-toxic nodular goiter and incisional hernia. Records of patients were analyzed for demographic features, intraoperative and postoperative complications and conversion to open surgery. Forty six female and 51 male patients were operated and mean age was 58,4 (range: 25-88). Ninety three out of 97 procedures (96%) were completed robotically, 4 were converted to open surgery and there were 15 postoperative complications. There was no mortality. Wide variety of procedures of general surgery can be managed safely and effectively by RALS. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  18. Assisting emergency operating procedures execution with AMAS, an Accident Management Advisor System

    International Nuclear Information System (INIS)

    Guarro, S.; Milici, T.; Wu, J.S.; Apostolakis, G.

    2004-01-01

    In an accident situation, because any decisions that the operators make will depend on how instrumentation readings are ultimately interpreted, the issue of instrument uncertainty is of paramount importance. This uncertainty exists because instrument readings may not be available in the desired form - i.e., only indirect readings for a parameter of interest may exist, with uncertainty on which physical models may be used to deduce its value from these indirect indications -, or because readings may be coming from instruments whose accuracy and reliability in the face of the severe conditions produced by the accident are far from what may be expected under normal operating conditions. In following the EOPs, the operators must rely on instrumentation whose readings may not reflect the real situation. The Accident Management Advisor System (AMAS) is a decision aid intended to supplement plant Emergency Operating Procedures (EOPs) by accounting for instrumentation uncertainty, and by alerting the operators if they are on the wrong procedures, or otherwise performing an action that is not optimal in terms of preventing core damage. In AMAS, the availability and reliability of certain important instrument readings is treated in probabilistic, rather than deterministic terms. This issue is discussed in greater detail later in the paper, since it relates to one of the key characteristics of the AMAS decision aid. (author)

  19. Impact of operator experience and training strategy on procedural outcomes with leadless pacing: Insights from the Micra Transcatheter Pacing Study.

    Science.gov (United States)

    El-Chami, Mikhael; Kowal, Robert C; Soejima, Kyoko; Ritter, Philippe; Duray, Gabor Z; Neuzil, Petr; Mont, Lluis; Kypta, Alexander; Sagi, Venkata; Hudnall, John Harrison; Stromberg, Kurt; Reynolds, Dwight

    2017-07-01

    Leadless pacemaker systems have been designed to avoid the need for a pocket and transvenous lead. However, delivery of this therapy requires a new catheter-based procedure. This study evaluates the role of operator experience and different training strategies on procedural outcomes. A total of 726 patients underwent implant attempt with the Micra transcatheter pacing system (TPS; Medtronic, Minneapolis, MN, USA) by 94 operators trained in a teaching laboratory using a simulator, cadaver, and large animal models (lab training) or locally at the hospital with simulator/demo model and proctorship (hospital training). Procedure success, procedure duration, fluoroscopy time, and safety outcomes were compared between training methods and experience (implant case number). The Micra TPS procedure was successful in 99.2% of attempts and did not differ between the 55 operators trained in the lab setting and the 39 operators trained locally at the hospital (P = 0.189). Implant case number was also not a determinant of procedural success (P = 0.456). Each operator performed between one and 55 procedures. Procedure time and fluoroscopy duration decreased by 2.0% (P = 0.002) and 3.2% (P safety outcomes by training method. Among a large group of operators, implantation success was high regardless of experience. While procedure duration and fluoroscopy times decreased with implant number, complications were low and not associated with case number. Procedure and safety outcomes were similar between distinct training methodologies. © 2017 Wiley Periodicals, Inc.

  20. Accurate, safe, and rapid method of intraoperative tumor identification for totally laparoscopic distal gastrectomy: injection of mixed fluid of sodium hyaluronate and patent blue.

    Science.gov (United States)

    Nakagawa, Masatoshi; Ehara, Kazuhisa; Ueno, Masaki; Tanaka, Tsuyoshi; Kaida, Sachiko; Udagawa, Harushi

    2014-04-01

    In totally laparoscopic distal gastrectomy, determining the resection line with safe proximal margins is often difficult, particularly for tumors located in a relatively upper area. This is because, in contrast to open surgery, identifying lesions by palpating or opening the stomach is essentially impossible. This study introduces a useful method of tumor identification that is accurate, safe, and rapid. On the operation day, after inducing general anesthesia, a mixture of sodium hyaluronate and patent blue is injected into the submucosal layer of the proximal margin. When resecting stomach, all marker spots should be on the resected side. In all cases, the proximal margin is examined histologically by using frozen sections during the operation. From October 2009 to September 2011, a prospective study that evaluated this method was performed. A total of 34 patients who underwent totally laparoscopic distal gastrectomy were enrolled in this study. Approximately 5 min was required to complete the procedure. Proximal margins were negative in all cases, and the mean ± standard deviation length of the proximal margin was 23.5 ± 12.8 mm. No side effects, such as allergy, were encountered. As a method of tumor identification for totally laparoscopic distal gastrectomy, this procedure appears accurate, safe, and rapid.

  1. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  2. The concept of the conservative operating policy

    International Nuclear Information System (INIS)

    Idita, S.A.

    1997-01-01

    In the context of the nuclear operating environment, the conservative operating policy is one that promotes a culture of moderation and caution. This policy requires compliance with the intent of the Reactor Operation Licence (ROL) and adherence with the limitations stipulated in the facility Operating Policies and Principles (OPP). While ROL is the document prescribing the laws governing the operation and maintenance the OPP are the statements defining the boundaries within which the facility will be operated. A conservative operating policy, that is well understood by all plant facility personnel provides assurance that plant operation and maintenance will be carried out in compliance with approved operating and maintenance procedures. In an abnormal plant operating situation where OPP's may be challenged, the provision of 'Abnormal Plant Operating Procedures' (APOP's) will stipulate actions designed to return the plant to a condition where normal procedures can be followed i.e. acceptably within OPP limitations. When in a NPP an operating scenario will develop where the the situation is not covered by normal approved operating procedures a conservative operating policy will empower the duty Shift Supervisor (SS) to initiate actions that will move the plant in the 'safe direction'. The paper enumerates the decisions which the SS has to make in order to ensure that the reactor power is correctly controlled, the reactor fuel remains cooled and the radioactivity remains contained. It is stressed that a corporate operating policy will be of little use if its existence is known only by corporate management. To be effective, and to be instrumental in the promotion of a facility safety culture, the conservative operating philosophy must be known about and fully understood by all personnel working at a nuclear facility. It is up to management to 'get the word out' and lead by example. (author)

  3. Transhepatic Hilar Approach for Perihilar Cholangiocarcinoma: Significance of Early Judgment of Resectability and Safe Vascular Reconstruction.

    Science.gov (United States)

    Kuriyama, Naohisa; Isaji, Shuji; Tanemura, Akihiro; Iizawa, Yusuke; Kato, Hiroyuki; Murata, Yasuhiro; Azumi, Yoshinori; Kishiwada, Masashi; Mizuno, Shugo; Usui, Masanobu; Sakurai, Hiroyuki

    2017-03-01

    In the most common surgical procedure for perihilar cholangiocarcinoma, the margin status of the proximal bile duct is determined at the final step. Our procedure, the transhepatic hilar approach, confirms a cancer-negative margin status of the proximal bile duct first. We first performed a partial hepatic parenchymal transection to expose the hilar plate, and then transected the proximal bile duct to confirm margin status. Then, divisions of the hepatic artery and portal vein of the future resected liver are performed, followed by the residual hepatic parenchymal transection. The transhepatic hilar approach offers a wide surgical field for safe resection and reconstruction of the portal vein in the middle of the hepatectomy. We reviewed 23 patients with perihilar cholangiocarcinoma who underwent major hepatectomy using our procedure from 2011 to 2015. A combined vascular resection and reconstruction was carried out in 14 patients (60.9%). R0 resection was achieved in 17 patients (73.9%), and the overall 3-year survival rate was 52.9% (median survival time 52.4 months). The transhepatic hilar approach is useful and practicable regardless of local tumor extension, enabling us to determine tumor resectability and perform safe resection and reconstruction of the portal vein early in the operation.

  4. Safe percutaneous suprapubic catheterisation.

    Science.gov (United States)

    Goyal, N K; Goel, A; Sankhwar, S N

    2012-11-01

    We describe our technique of percutaneous suprapubic catheter insertion with special reference to steps that help to avoid common complications of haematuria and catheter misplacement. The procedure is performed using a stainless steel reusable trocar under local infiltrative anaesthesia, usually at the bedside. After clinical confirmation of a full bladder, the trocar is advanced into the bladder through a skin incision. Once the bladder is entered, the obturator is removed and the assistant inserts a Foley catheter followed by rapid balloon inflation. Slight traction is applied to the catheter for about five minutes. Patients with previous lower abdominal surgery, an inadequately distended bladder or acute pelvic trauma do not undergo suprapubic catheterisation using this method. The procedure was performed in 72 men (mean age: 42.4 years, range: 18-78 years) with urinary retention with a palpable bladder. The average duration of the procedure was less than five minutes. No complications were noted in any of the patients. Trocar suprapubic catheter insertion is a safe and effective bedside procedure for emergency bladder drainage and can be performed by resident surgeons. The common complications associated with the procedure can be avoided with a few careful steps.

  5. Emergency operating procedures guidelines for pressurized water reactors - a progress report

    International Nuclear Information System (INIS)

    Lyon, W.C.

    1984-01-01

    Emergency Operating Procedures (EOPs) contain the instructions the operator will follow to control a nuclear plant whenever a condition exists that potentially jeopardizes the fuel cladding, the reactor coolant system (RCS) pressure boundary, or the containment. The EOPs are prepared from guidelines which contain the major operator instructions that will be in the EOPs. Guidelines have been prepared by owners' groups having Babcock and Wilcox (BandW), Combustion Engineering (CE), General Electric (GE), and Westinghouse (W) plants. These guidelines cover many aspects of full power operation. Future effort is anticipated to complete coverage of transient events, including severe accidents, all power conditions, and shutdown. This paper describes the philosophy which has guided NRC technical review of guidelines, progress achieved in providing comprehensive coverage of emergency conditions for PWRs, and anticipated future technical activities

  6. Mental workload measurement for emergency operating procedures in digital nuclear power plants.

    Science.gov (United States)

    Gao, Qin; Wang, Yang; Song, Fei; Li, Zhizhong; Dong, Xiaolu

    2013-01-01

    Mental workload is a major consideration for the design of emergency operation procedures (EOPs) in nuclear power plants. Continuous and objective measures are desired. This paper compares seven mental workload measurement methods (pupil size, blink rate, blink duration, heart rate variability, parasympathetic/sympathetic ratio, total power and (Goals, Operations, Methods, and Section Rules)-(Keystroke Level Model) GOMS-KLM-based workload index) with regard to sensitivity, validity and intrusiveness. Eighteen participants performed two computerised EOPs of different complexity levels, and mental workload measures were collected during the experiment. The results show that the blink rate is sensitive to both the difference in the overall task complexity and changes in peak complexity within EOPs, that the error rate is sensitive to the level of arousal and correlate to the step error rate and that blink duration increases over the task period in both low and high complexity EOPs. Cardiac measures were able to distinguish tasks with different overall complexity. The intrusiveness of the physiological instruments is acceptable. Finally, the six physiological measures were integrated using group method of data handling to predict perceived overall mental workload. The study compared seven measures for evaluating the mental workload with emergency operation procedure in nuclear power plants. An experiment with simulated procedures was carried out, and the results show that eye response measures are useful for assessing temporal changes of workload whereas cardiac measures are useful for evaluating the overall workload.

  7. Design Guidance for Computer-Based Procedures for Field Workers

    Energy Technology Data Exchange (ETDEWEB)

    Oxstrand, Johanna [Idaho National Lab. (INL), Idaho Falls, ID (United States); Le Blanc, Katya [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bly, Aaron [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-09-01

    Nearly all activities that involve human interaction with nuclear power plant systems are guided by procedures, instructions, or checklists. Paper-based procedures (PBPs) currently used by most utilities have a demonstrated history of ensuring safety; however, improving procedure use could yield significant savings in increased efficiency, as well as improved safety through human performance gains. The nuclear industry is constantly trying to find ways to decrease human error rates, especially human error rates associated with procedure use. As a step toward the goal of improving field workers’ procedure use and adherence and hence improve human performance and overall system reliability, the U.S. Department of Energy Light Water Reactor Sustainability (LWRS) Program researchers, together with the nuclear industry, have been investigating the possibility and feasibility of replacing current paper-based procedures with computer-based procedures (CBPs). PBPs have ensured safe operation of plants for decades, but limitations in paper-based systems do not allow them to reach the full potential for procedures to prevent human errors. The environment in a nuclear power plant is constantly changing, depending on current plant status and operating mode. PBPs, which are static by nature, are being applied to a constantly changing context. This constraint often results in PBPs that are written in a manner that is intended to cover many potential operating scenarios. Hence, the procedure layout forces the operator to search through a large amount of irrelevant information to locate the pieces of information relevant for the task and situation at hand, which has potential consequences of taking up valuable time when operators must be responding to the situation, and potentially leading operators down an incorrect response path. Other challenges related to use of PBPs are management of multiple procedures, place-keeping, finding the correct procedure for a task, and relying

  8. The step complexity measure for emergency operating procedures: measure verification

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Ha, Jaejoo; Park, Changkue

    2002-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. Therefore, to prevent an occurrence of accidents or to ensure system safety, extensive effort has been made to identify significant factors that can cause human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors, and the understandability is pointed out as one of the major reasons for procedure-related human errors. Many qualitative checklists are suggested to evaluate emergency operating procedures (EOPs) of NPPs. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is very necessary to compensate for them. In order to quantify the complexity of steps included in EOPs, Park et al. suggested the step complexity (SC) measure. In addition, to ascertain the appropriateness of the SC measure, averaged step performance time data obtained from emergency training records for the loss of coolant accident and the excess steam dump event were compared with estimated SC scores. Although averaged step performance time data show good correlation with estimated SC scores, conclusions for some important issues that have to be clarified to ensure the appropriateness of the SC measure were not properly drawn because of lack of backup data. In this paper, to clarify remaining issues, additional activities to verify the appropriateness of the SC measure are performed using averaged step performance time data obtained from emergency training records. The total number of available records is 36, and training scenarios are the steam generator tube rupture and the loss of all feedwater. The number of scenarios is 18 each. From these emergency training records, averaged step performance time data for 30 steps are retrieved. As the results, the SC measure shows statistically meaningful

  9. Impact of procedure on the post-operative infection risk of patients after elective colon surgery.

    Science.gov (United States)

    Blitzer, David N; Davis, John M; Ahmed, Nasim; Kuo, Yen-Hong; Kuo, Yen-Liang

    2014-12-01

    Post-operative infection impacts the quality of patient care, prolongs the length of hospital stay, and utilizes more health care resources. The purpose of this study was to compare the rates of surgical site infection among three major surgical procedures for treating patients with colon pathology. The location of colon resection impacts the post-operative infection rate. A retrospective cohort study was conducted by using the 2006 Nationwide Inpatient Sample. Adult patients (age ≥18 yr) with colon diseases are the population of interest. The disease status and procedures were categorized according to the International Classification of Diseases, Ninth Revision, Clinical Modification (ICD-9-CM). Patients with a primary diagnosis of diverticulosis of the colon without hemorrhage (ICD-9-CM codes: 562.11 and 562.12) or malignant neoplasm of the colon (ICD-9-CM codes: 153.x, where x represents the possible digits within this ICD-9-CM code category), with procedures of open and other right hemicolectomy (ORH; ICD-9-CM code: 45.73) or open and other left hemicolectomy (OLH; ICD-9-CM code: 45.75), or open and other sigmoidectomy (OS; ICD-9-CM code: 45.76) were included for this study. The primary measured outcome for the study was surgical site infection. There were an estimated 26,381 ORH procedures, 9,558 OLH procedures, and 31,656 OS procedures performed in 2006. There was a significant difference among procedures with respect to their age distributions (mean [standard error]: ORH vs. OLH vs. OS=70.5 [0.2] vs. 63.8 [0.3] vs. 59.5 [0.2] yr, pinfection rates: ORH vs. OLH vs. OS=2.9% vs. 5.6% vs. 4.9%, pinfection for OLH (AOR [95% CI]: 1.31 [1.04-1.64], p=0.02) compared with OS. Different sites of colon operations were associated with different risks of surgical site infections. Accordingly, appropriate pre-operative measures should address these differences.

  10. Surveillance of Environmental and Procedural Measures of Infection Control in the Operating Theatre Setting

    Directory of Open Access Journals (Sweden)

    Laura Dallolio

    2017-12-01

    Full Text Available The microbiological contamination of operating theatres and the lack of adherence to best practices by surgical staff represent some of the factors affecting Surgical Site Infections (SSIs. The aim of the present study was to assess the microbiological quality of operating settings and the staff compliance to the SSI evidence-based control measures. Ten operating rooms were examined for microbiological contamination of air and surfaces, after cleaning procedures, in “at rest” conditions. Furthermore, 10 surgical operations were monitored to assess staff compliance to the recommended practices. None of the air samples exceeded microbiological reference standards and only six of the 200 surface samples (3.0% were slightly above recommended levels. Potentially pathogenic bacteria and moulds were never detected. Staff compliance to best practices varied depending on the type of behaviour investigated and the role of the operator. The major not compliant behaviours were: pre-operative skin antisepsis, crowding of the operating room and hand hygiene of the anaesthetist. The good environmental microbiological quality observed is indicative of the efficacy of the cleaning-sanitization procedures adopted. The major critical point was staff compliance to recommended practices. Awareness campaigns are therefore necessary, aimed at improving the organisation of work so as to facilitate compliance to operative protocols.

  11. Safe Operation of Nuclear Power Plants: Impacts of Human and Organisational Factors and Emerging Technologies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    In co-operation with the OECD Nuclear Energy Agency (NEA), the Halden Reactor Project organised a Summer School on ''Safe Operation of Nuclear Power Plants: Impacts of Human and Organisational Factors and Emerging Technologies'' in the period August 27-August 31, 2001. The Summer School was intended for scientists, engineers and technicians working for nuclear installations, engineering companies, industry and members of universities and research institutes, who wanted to broaden their nuclear background by getting acquainted with Man-Technology-Organisation-related subjects and issues. The Summer School should also serve to transfer knowledge to the ''young generation'' in the nuclear field. The following presentations were given: (1) Overview of the Nuclear Community and Current issues, (2) The Elements of Safety Culture; Evaluation of Events, (3) Quality Management (QM), (4) Probabilistic Risk Assessment (PSA), (5) Human Behaviour from the Viewpoint of Industrial Psychology, (6) Technical tour of the Halden Project Experimental Facilities, (7) Human Factors in Control Room Design, (8) Computerised Operator Support Systems (COSSs) and (9) Artificial Intelligence; a new Approach. Most of the contributions are overhead figures from spoken lectures.

  12. Combined SAFE/SNAP approach to safeguards evaluation

    International Nuclear Information System (INIS)

    Engi, D.; Chapman, L.D.; Grant, F.H.; Polito, J.

    1980-01-01

    Generally, the scope of a safeguards evaluation model can efficiently address one of two issues, (1) global safeguards effectiveness, or (2) vulnerability analysis for individual scenarios. The Safeguards Automated Facility Evaluation (SAFE) focuses on (1) while the Safeguards Network Analysis Procedure (SNAP) is directed at (2). SAFE addresses (1) in that it considers the entire facility, i.e., the composite system of hardware and human components, in one global analysis. SNAP addresses (2) by providing a safeguards modeling symbology sufficiently flexible to represent quite complex scenarios from the standpoint of hardware interfaces while also accounting for a rich variety of human decision making. A combined SAFE/SNAP approach to the problem of safeguards evaluation is described and illustrated through an example

  13. Bentall Procedure Using Cryopreserved Valved Aortic Homografts

    Science.gov (United States)

    Christenson, Jan T.; Sierra, Jorge; Trindade, Pedro T.; Didier, Dominique; Kalangos, Afksendiyos

    2004-01-01

    The Bentall procedure is the standard operation for patients who have lesions of the ascending aorta associated with aortic valve disease. In many cases, however, mechanical prosthetic conduits are not suitable. There are few reports in the English-language medical literature concerning the mid- to long-term outcome of Bentall operations with cryopreserved homografts. Therefore, we reviewed our experience with this procedure and valved homografts. From January 1997 through December 2002, 21 patients underwent a Bentall operation with cryopreserved homografts at our institution. There were 14 males and 7 females; the mean age was 36 ± 21 years (range, 15–74 years). Eleven patients had undergone previous aortic valve surgery. All patients had aortic dilatation or aneurysms involving the ascending aorta. Indications for surgery included aortic valve stenosis or insufficiency, and aortic valve endocarditis (native valve or prosthetic). One patient had Takayasu's arteritis and 3 had Marfan syndrome. There was 1 hospital death (due to sepsis), but no other major postoperative complications. The mean hospital stay was 14 ± 7 days. Follow-up echocardiographic and computed tomographic scans were performed yearly. The mean follow-up was 34 months (6–72 months). Follow-up imaging revealed no calcifications or degenerative processes related to the homograft. Four patients had minimal valve regurgitation. Two patients died during follow-up. The 3-year actuarial survival rate was 85.7%. Our data suggest that the Bentall procedure with a valved homograft conduit is a safe procedure with excellent mid- to long-term results, comparable to results reported with aortic valve replacement with a homograft. PMID:15745290

  14. Study on the identification of main drivers affecting the performance of human operators during low power and shutdown operation

    International Nuclear Information System (INIS)

    Kim, Ar Ryum; Park, Jinkyun; Kim, Ji Tae; Kim, Jaewhan; Seong, Poong Hyun

    2016-01-01

    Highlights: • The performance of human operator during LPSD operation is significantly important. • Human performance is affected by drivers such as procedure, training, and etc. • Main drivers during LPSD operation at domestic NPPs were suggested. • It is expected that it will be used for estimating human reliability during LPSD operation. - Abstract: In the past, many researchers believed that a reactor during low power and shutdown operation was sufficiently safe. This belief has been changed by the number of accidents during such types of operation, which is significantly high. Also, it was pointed out that one of the main differences between low power and shutdown operation and full power operation is the significance of human action because there are huge amounts of human actions due to extensive maintenance and testing while automatic control and safety functions may be disabled and procedures are insufficient or incomplete. This paper suggests the main drivers in performing human reliability analysis. For this study, we reviewed eight reports relating to human performance during low power and shutdown operation and applied a root cause analysis method for 53 human or human-related events at domestic nuclear power plants to derive the main drivers that affect the occurrence of those events. As a result, several main drivers were derived, such as procedures, training, experience of personnel, and workload/stress. It is expected that these main drivers will be used to perform human reliability analysis for low power and shutdown operation.

  15. Nonspecific abdominal pain is a safe diagnosis.

    Science.gov (United States)

    Pennel, David John Laurie; Goergen, Nina; Driver, Chris P

    2014-11-01

    The aim of this study is to assess if a clinical diagnosis of nonspecific abdominal pain (NSAP) is safe and if patients with this initial diagnosis are likely to require further investigation or surgical intervention. 3323 patients admitted with NSAP from July 1990 to September 2012 utilizing a prospective database of all surgical admissions were included. Readmission over the period of the study and specifically within 30 days of their initial presentation was identified together with any invasive investigation or surgical intervention. 319 children (9.6%) were subsequently readmitted with abdominal pain at some point during the study period. Of these, 78 (2.3%) were readmitted within 30 days. 118 (3.5%) children subsequently had an operation or invasive investigation some point following their initial admission. Of these 33 (0.6%) had the procedure within 3 months of the initial admission. 13 patients had an appendicectomy within 3 months of the initial presentation. Of these histology confirmed appendicitis in 8 patients. This gives an overall incidence of "missed" appendicitis of 0.2 % (8/3323). This study confirms that a clinical diagnosis of nonspecific abdominal pain (NSAP) is safe in a pediatric population and the risk of "missing" appendicitis is only 0.2%. Patients and/or parents can be confidently reassured that the risk of missing organic pathology is very low. Copyright © 2014 Elsevier Inc. All rights reserved.

  16. Working safely in gamma radiography. A training manual for industrial radiographers

    International Nuclear Information System (INIS)

    McGuire, S.A.; Peabody, C.A.

    1982-09-01

    This manual is designed for classroom training in working safely in industrial radiography using gamma sources. The purpose is to train radiographers' assistants to work safely as a qualified gamma radiographer. The contents cover the essentials of radiation, radiation protection, emergency procedures, gamma cameras, and biological effects of radiation

  17. AP1000 passive core cooling system pre-operational tests procedure definition and simulation by means of Relap5 Mod. 3.3 computer code

    International Nuclear Information System (INIS)

    Lioce, D.; Asztalos, M.; Alemberti, A.; Barucca, L.; Frogheri, M.; Saiu, G.

    2012-01-01

    Highlights: ► Two AP1000 Core Make-up Tanks pre-operational tests procedures have been defined. ► The two tests have been simulated by means of the Relap5 computer code. ► Results show the tests can be successfully performed with the selected procedures. - Abstract: The AP1000 ® plant is an advanced Pressurized Water Reactor designed and developed by Westinghouse Electric Company which relies on passive safety systems for core cooling, containment isolation and containment cooling, and maintenance of main control room emergency habitability. The AP1000 design obtained the Design Certification by NRC in January 2006, as Appendix D of 10 CFR Part 52, and it is being built in two locations in China. The AP1000 plant will be the first commercial nuclear power plant to rely on completely passive safety systems for core cooling and its licensing process requires the proper operation of these systems to be demonstrated through some pre-operational tests to be conducted on the real plant. The overall objective of the test program is to demonstrate that the plant has been constructed as designed, that the systems perform consistently with the plant design, and that activities culminating in operation at full licensed power including initial fuel load, initial criticality, and power increase to full load are performed in a controlled and safe manner. Within this framework, Westinghouse Electric Company and its partner Ansaldo Nucleare S.p.A. have strictly collaborated, being Ansaldo Nucleare S.p.A. in charge of the simulation of some pre-operational tests and supporting Westinghouse in the definition of tests procedures. This paper summarizes the work performed at Ansaldo Nucleare S.p.A. in collaboration with Westinghouse Electric Company for the Core Makeup Tank (CMT) tests, i.e. the CMTs hot recirculation test and the CMTs draindown test. The test procedure for the two selected tests has been defined and, in order to perform the pre-operational tests simulations, a

  18. AP1000 passive core cooling system pre-operational tests procedure definition and simulation by means of Relap5 Mod. 3.3 computer code

    Energy Technology Data Exchange (ETDEWEB)

    Lioce, D., E-mail: donato.lioce@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Asztalos, M., E-mail: asztalmj@westinghouse.com [Westinghouse Electric Company, Cranberry Twp, PA 16066 (United States); Alemberti, A., E-mail: alessandro.alemberti@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Barucca, L. [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Frogheri, M., E-mail: monicalinda.frogheri@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy); Saiu, G., E-mail: gianfranco.saiu@aen.ansaldo.it [Ansaldo Nucleare S.p.A., Corso F. M. Perrone 25, 16161, Genova (Italy)

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Two AP1000 Core Make-up Tanks pre-operational tests procedures have been defined. Black-Right-Pointing-Pointer The two tests have been simulated by means of the Relap5 computer code. Black-Right-Pointing-Pointer Results show the tests can be successfully performed with the selected procedures. - Abstract: The AP1000{sup Registered-Sign} plant is an advanced Pressurized Water Reactor designed and developed by Westinghouse Electric Company which relies on passive safety systems for core cooling, containment isolation and containment cooling, and maintenance of main control room emergency habitability. The AP1000 design obtained the Design Certification by NRC in January 2006, as Appendix D of 10 CFR Part 52, and it is being built in two locations in China. The AP1000 plant will be the first commercial nuclear power plant to rely on completely passive safety systems for core cooling and its licensing process requires the proper operation of these systems to be demonstrated through some pre-operational tests to be conducted on the real plant. The overall objective of the test program is to demonstrate that the plant has been constructed as designed, that the systems perform consistently with the plant design, and that activities culminating in operation at full licensed power including initial fuel load, initial criticality, and power increase to full load are performed in a controlled and safe manner. Within this framework, Westinghouse Electric Company and its partner Ansaldo Nucleare S.p.A. have strictly collaborated, being Ansaldo Nucleare S.p.A. in charge of the simulation of some pre-operational tests and supporting Westinghouse in the definition of tests procedures. This paper summarizes the work performed at Ansaldo Nucleare S.p.A. in collaboration with Westinghouse Electric Company for the Core Makeup Tank (CMT) tests, i.e. the CMTs hot recirculation test and the CMTs draindown test. The test procedure for the two

  19. Manpower development for safe operation of nuclear power plant. China. Simulator software development. UNDP-Activity: 2.1.8-IAEA-Task-01. Technical report

    International Nuclear Information System (INIS)

    Feng, C.P.

    1994-01-01

    In the frameworks of the project ''manpower development for safe operation of nuclear power plant'' the development of reactor simulator software is described. Qinshan nuclear power plant was chosen as a reference one

  20. Procedure for taking physical inventories

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This session is intended to apprise one of the various aspects of procedures and routines that Exxon Nuclear uses with respect to its nuclear materials physical inventory program. The presentation describes how plant physical inventories are planned and taken. The description includes the planning and preparation for taking the inventory, the clean-out procedures for converting in-process material to measurable items, the administrative procedures for establishing independent inventory teams and for inventorying each inventory area, the verification procedures used to include previously measured tamper-safed items in the inventory, and lastly, procedures used to reconcile the inventory and calculate MUF (materials unaccounted for). The purpose of the session is to enable participants to: (1) understand the planning and pre-inventorty procedures and their importance; (2) understand the need for and the required intensity of clean-out procedures; (3) understand how inventory teams are formed, and how the inventory is conducted; (4) understand the distinction between inventory previously measured tamper-safed items and other materials not so characterized; (5) understand the reconciliation procedures; and (6) calculate a MUF given the book and inventory results

  1. Safe injection procedures, injection practices, and needlestick ...

    African Journals Online (AJOL)

    Nermine Mohamed Tawfik Foda

    2017-01-10

    Jan 10, 2017 ... sures regarding disposable injection equipment, waste containers, hand hygiene ... injection practices lead to high prevalence of NSSIs in operating rooms. .... guidelines, the availability of training courses to HCWs, and provi-.

  2. Working safely in gamma radiography. A training manual for industrial radiographers

    Energy Technology Data Exchange (ETDEWEB)

    McGuire, S.A.; Peabody, C.A.

    1982-09-01

    This manual is designed for classroom training in working safely in industrial radiography using gamma sources. The purpose is to train radiographers' assistants to work safely as a qualified gamma radiographer. The contents cover the essentials of radiation, radiation protection, emergency procedures, gamma cameras, and biological effects of radiation. (ACR)

  3. Electrocautery skin incision for neurosurgery procedures--technical note.

    Science.gov (United States)

    Nitta, Naoki; Fukami, Tadateru; Nozaki, Kazuhiko

    2011-01-01

    The reluctance to incise skin with electrocautery is partly attributable to concerns about excessive scarring and poor wound healing. However, recently no difference was reported in wound complications between the cold scalpel and electrocautery scalpel. We assessed the safety and efficacy of electrocautery skin incision in 22 scalp incisions, including 4 cases of reoperation. Electrocautery skin incisions were created using a sharp needle electrode. The generator unit was set on cutting mode, with power of 6 W and 330 kHz sinusoid waveform. Subcutaneous dissections also used the sharp needle electrode, set on coagulating mode, with power of 10 W and 1 MHz pulse-modulated waveform. Galea incisions used a standard blade tip, set on coagulating mode, with power of 20 W and 1 MHz pulse-modulated waveform. Skin incision with the sharp needle electrode caused no charring of the wound. Little bleeding or oozing were observed and skin clips were not necessary. No wound complication such as necrosis or infection occurred. Electrocautery skin incisions for re-operations were also performed safely without complications. Electrocautery skin incision is sufficiently safe procedure not only for first operation but also for re-operation. Electrocautery skin incision is efficacious, especially for extended operation times, because of little blood loss from the edges of skin incision and possible avoidance of skin edge necrosis or alopecia caused by skin clips.

  4. NRC/FEMA operational response procedures for response to a commercial nuclear reactor accident

    International Nuclear Information System (INIS)

    1983-11-01

    Procedures have been developed by the US Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) which provide the response teams of both agencies with the steps to be taken in responding to an emergency at a commercial nuclear power plant. The emphasis of these procedures is mainly on the interface between NRC and FEMA at their respective Headquarters and Regional Offices and at the various sites at which such an emergency could occur. Detailed procedures are presented that cover for both agencies, notification schemes and manner of activation, organizations at Headquaters and the site, interface procedures, coordination of onsite and offsite operations, the role of the Senior FEMA Official, and the cooperative efforts of each agency's public information staff

  5. Predictors of Post-Operative Pain Relief in Patients with Chronic Pancreatitis Undergoing the Frey or Whipple Procedure.

    Science.gov (United States)

    Sinha, Amitasha; Patel, Yuval A; Cruise, Michael; Matsukuma, Karen; Zaheer, Atif; Afghani, Elham; Yadav, Dhiraj; Makary, Martin A; Hirose, Kenzo; Andersen, Dana K; Singh, Vikesh K

    2016-04-01

    Post-operative pain relief in chronic pancreatitis (CP) is variable. Our objective was to determine clinical imaging or histopathologic predictor(s) of post-operative pain relief in CP patients undergoing the Whipple or Frey procedure. All patients who underwent a Whipple (n = 30) or Frey procedure (n = 30) for painful CP between January 2003 and September 2013 were evaluated. A toxic etiology was defined as a history of alcohol use and/or smoking. The pre-operative abdominal CT was evaluated for calcification(s) and main pancreatic duct (MPD) dilation (≥5 mm). The post-operative histopathology was evaluated for severe fibrosis. Clinical imaging and histopathologic features were evaluated as predictors of post-operative pain relief using univariable and multivariable regression analysis. A total of 60 patients (age 51.6 years, 53% males) were included in our study, of whom 42 (70%) reported post-operative pain relief over a mean follow-up of 1.1 years. There were 37 (62%) patients with toxic etiology, 36 (60%) each with calcification(s) and MPD dilation. A toxic etiology, calcifications, and severe fibrosis were associated with post-operative pain relief on univariable analysis (all p Whipple or Frey procedure.

  6. Potential Operating Orbits for the SAFE-400

    International Nuclear Information System (INIS)

    Houts, Mike; Kos, Larry; Poston, David

    2002-01-01

    Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp > 3000 s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into nonradioactive isotopes. Operational constraints required to ensure safety can thus be quantified. (authors)

  7. Soil Sampling Operating Procedure

    Science.gov (United States)

    EPA Region 4 Science and Ecosystem Support Division (SESD) document that describes general and specific procedures, methods, and considerations when collecting soil samples for field screening or laboratory analysis.

  8. A cost and time analysis of laryngology procedures in the endoscopy suite versus the operating room.

    Science.gov (United States)

    Hillel, Alexander T; Ochsner, Matthew C; Johns, Michael M; Klein, Adam M

    2016-06-01

    To assess the costs, charges, reimbursement, and efficiency of performing awake laryngology procedures in an endoscopy suite (ES) compared with like procedures performed in the operating room (OR). Retrospective review of billing records. Cost, charges, and reimbursements for the hospital, surgeon, and anesthesiologist were compared between ES injection laryngoplasty and laser excision procedures and matched case controls in the OR. Time spent in 1) the preoperative unit, 2) the operating or endoscopy suite, and 3) recovery unit were compared between OR and ES procedures. Hospital expenses were significantly less for ES procedures when compared to OR procedures. Reimbursement was similar for ES and OR injection laryngoplasty, though greater for OR laser excisions. Net balance (reimbursement-expenses) was greater for ES procedures. A predictive model of payer costs over a 3-year period showed similar costs for ES and OR laser procedures and reduced costs for ES compared to OR injection laryngoplasty. Times spent preoperatively and the procedure were significantly less for ES procedures. For individual laryngology procedures, the ES reduces time and costs compared to the OR, increasing otolaryngologist and hospital efficiency. This reveals cost and time savings of ES injection laryngoplasty, which occurs at a similar frequency as OR injection laryngoplasty. Given the increased frequency for ES laser procedures, total costs are similar for ES and OR laser excision of papilloma, which usually require repeated procedures. When regulated office space is unavailable, endoscopy rooms represent an alternative setting for unsedated laryngology procedures. NA Laryngoscope, 126:1385-1389, 2016. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  9. Validation of radioactivity measurements under the Safe Drinking Water Act

    International Nuclear Information System (INIS)

    Goldin, Abraham S.

    1978-01-01

    Radioactivity measurements are made under the Safe Drinking Water Act to obtain information on the potential radiological hazard of water and to institute regulatory action when water quality does not meet requirements. Measurements must be both precise and accurate if these goals are to be met. Regulations issued under the act require that analyses be performed by approved (certified) laboratories, which must carry out quality assurance programs. This paper briefly describes the certification requirements and discusses the components of an effective quality assurance program. The Environmental Protection Agency has established procedures for the certification of laboratories making radioactivity measurements of drinking water. These procedures recommend minimum laboratory qualifications for personnel, facilities, equipment, and procedures; proficiency testing by analysis of samples provided by the Agency; and operation of a quality assurance program. A major function of a quality assurance program is to provide the Laboratory Director an ongoing flow of information on laboratory analytical performance. A properly designed and conducted program provides this information in a timely manner, indicates areas where discrepancies exist, and often suggests ways of correcting the discrepancies. Pertinent aspects of radioactivity measurements for drinking water are discussed, including how analyses of blanks, blind duplicates, and reference samples contribute needed information, and evaluations by control charts and statistical analyses. Examples of the usefulness of quality control in correcting both procedural and background problems are given. (author)

  10. Safe operation of nuclear ships

    International Nuclear Information System (INIS)

    Danilov, L.

    1982-01-01

    A summary is given of the experience with the three Soviet nuclear icebreakers, Lenin, Arktika and Sibir. Engineering problems, especially of reactor maintenance, and the way they have been overcome, are described. Reference is also made to improvements in reactor fuel and core design, and to safety aspects of the refuelling operation. (U.K.)

  11. Knowing the operative game plan: a novel tool for the assessment of surgical procedural knowledge.

    Science.gov (United States)

    Balayla, Jacques; Bergman, Simon; Ghitulescu, Gabriela; Feldman, Liane S; Fraser, Shannon A

    2012-08-01

    What is the source of inadequate performance in the operating room? Is it a lack of technical skills, poor judgment or a lack of procedural knowledge? We created a surgical procedural knowledge (SPK) assessment tool and evaluated its use. We interviewed medical students, residents and training program staff on SPK assessment tools developed for 3 different common general surgery procedures: inguinal hernia repair with mesh in men, laparoscopic cholecystectomy and right hemicolectomy. The tools were developed as a step-wise assessment of specific surgical procedures based on techniques described in a current surgical text. We compared novice (medical student to postgraduate year [PGY]-2) and expert group (PGY-3 to program staff) scores using the Mann-Whitney U test. We calculated the total SPK score and defined a cut-off score using receiver operating characteristic analysis. In all, 5 participants in 7 different training groups (n = 35) underwent an interview. Median scores for each procedure and overall SPK scores increased with experience. The median SPK for novices was 54.9 (95% confidence interval [CI] 21.6-58.8) compared with 98.05 (95% CP 94.1-100.0) for experts (p = 0.012). The SPK cut-off score of 93.1 discriminates between novice and expert surgeons. Surgical procedural knowledge can reliably be assessed using our SPK assessment tool. It can discriminate between novice and expert surgeons for common general surgical procedures. Future studies are planned to evaluate its use for more complex procedures.

  12. Comparing the subjective task difficulty of human operators with task description levels

    International Nuclear Information System (INIS)

    Park, Jin Kyun; Jung, Won Dea; Yang, Joon Eon

    2011-01-01

    Without the loss of generality, it is reasonable to say that an operating procedure consists of many steps including detailed descriptions that provide necessary information in conducting the required tasks safely and effectively. In this regard, since it is widely perceived that procedures are effective for reducing the occurrence of human performance related problems, the use of procedures is very popular in large process control systems including nuclear power plants (NPPs), commercial airplanes and railway systems. However, the secure of an operational safety by using an operating procedure can be accomplished only if human operators are able to effectively obtain necessary information from it. In other words, it is hard to expect the reduction of human performance related problems, if task descriptions are so ambiguous or incomplete that human operators feel an undue difficulty in identifying 'what have to be done' and 'how to do it' from procedures. Unfortunately, it seems that a systematic method that can be used to distinguish the proper level of task descriptions is rare. For this reason, Park et al. developed a decision chart that could be helpful for characterizing the level of task descriptions. In this study, in order to ensure the appropriateness of the suggested decision chart, more detailed investigations were conducted with the support of human operators who are working as the operating personnel of NPPs

  13. Non-operative management of perforated peptic ulcer

    International Nuclear Information System (INIS)

    Rahman, M.M.; Ahsan, H.N.; Hossain, M.D.

    2003-01-01

    Objective: The aim of this study was to see the morbidity and mortality in peptic ulcer perforation cases by non-operative management in selected cases. Results: In the selected 54 patients, male: female were 49:05. Nine had history of NSAID intake. There was no mortality. Morbidity analysis showed that three had hepatic abscess, four had pelvic abscess, six took prolonged time for improvement, in two cases conservative treatment had to be abandoned and laparotomy was done in the same hospital admission. Conclusion: Non-operative procedure is a safe and effective measure for the management of perforated peptic ulcer in selected cases. (author)

  14. Operation Procedure of Inspection Equipment for TRISO-coated Fuel Particle

    International Nuclear Information System (INIS)

    Kim, S. H.; Kim, Y. K.; Cho, M. S.; Kim, Y. M.; Park, J. Y.; Kim, W. J.; Jeong, K. C.; Oh, S. C.; Lee, Y. W.

    2007-03-01

    TRISO-coated fuel particle for HTGR(high temperature gas cooled reactor) is composed of fuel kernel and coating layers. The kernel and coated particle are characterized by inspection processes for inspection items such as diameter of kernel, thickness, density and an-isotropy of coating layer. The coating thickness can be nondestructively measured by X-ray inspection equipment. The coating thickness as well as the sphericity can be also measured by optical inspection system as a ceramography method. The an-isotropy can be characterized by photometer. The density of coating layer can be measured by density column. The size and sphericity of particles can be measured by PSA(particle size analyzer). The thermo-chemical characteristics of kernel can be analyzed by TG/DTA(Thermogravimetric/Differential Thermal Analyzer). The inspection objective, equipment composition, operation principle, operation manual for each equipment was described in this operation procedure, which will be used for the characterization of inspection items described above

  15. Upgrade of the Department of Energy's Savannah River Site's reactor operations and maintenance procedures

    International Nuclear Information System (INIS)

    Walsh, T.E.

    1991-01-01

    This paper describes the program in progress at the Savannah River Site (SRS) to upgrade the existing reactor operating and maintenance procedures to current commercial nuclear industry standards. In order to meet this goal, the following elements were established: administrative procedures to govern the upgrade process, tracking system to provide status and accountability; and procedure writing guides. The goal is to establish a benchmark of excellence by which other Department of Energy (DOE) sites will measure themselves. The above three elements are addressed in detail in this paper

  16. Generic procedure for designing and implementing plan management systems for space science missions operations

    Science.gov (United States)

    Chaizy, P. A.; Dimbylow, T. G.; Allan, P. M.; Hapgood, M. A.

    2011-09-01

    This paper is one of the components of a larger framework of activities whose purpose is to improve the performance and productivity of space mission systems, i.e. to increase both what can be achieved and the cost effectiveness of this achievement. Some of these activities introduced the concept of Functional Architecture Module (FAM); FAMs are basic blocks used to build the functional architecture of Plan Management Systems (PMS). They also highlighted the need to involve Science Operations Planning Expertise (SOPE) during the Mission Design Phase (MDP) in order to design and implement efficiently operation planning systems. We define SOPE as the expertise held by people who have both theoretical and practical experience in operations planning, in general, and in space science operations planning in particular. Using ESA's methodology for studying and selecting science missions we also define the MDP as the combination of the Mission Assessment and Mission Definition Phases. However, there is no generic procedure on how to use FAMs efficiently and systematically, for each new mission, in order to analyse the cost and feasibility of new missions as well as to optimise the functional design of new PMS; the purpose of such a procedure is to build more rapidly and cheaply such PMS as well as to make the latter more reliable and cheaper to run. This is why the purpose of this paper is to provide an embryo of such a generic procedure and to show that the latter needs to be applied by people with SOPE during the MDP. The procedure described here proposes some initial guidelines to identify both the various possible high level functional scenarii, for a given set of possible requirements, and the information that needs to be associated with each scenario. It also introduces the concept of catalogue of generic functional scenarii of PMS for space science missions. The information associated with each catalogued scenarii will have been identified by the above procedure and

  17. Surveillance procedure for the rotary drilling operations of a well

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, B; Deshais, R

    1988-06-17

    A surveillance procedure for the rotary drilling operations of a well is proposed. When the drilling pipe is drawn out of the well, or put into the well, pipe elements are taken away or added. At each moment the height of the trepan in the well is measured, together with the traction force of the lifting engine. The device permits to avoid the important damage that can be caused by an error on the drilling pipe's length.

  18. Surveillance procedure for the rotary drilling operations of a well

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, B.; Deshais, R.

    1988-06-17

    A surveillance procedure for the rotary drilling operations of a well is proposed. When the drilling pipe is drawn out of the well, or put into the well, pipe elements are taken away or added. At each moment the height of the trepan in the well is measured, together with the traction force of the lifting engine. The device permits to avoid the important damage that can be caused by an error on the drilling pipe's length.

  19. Peroral endoscopic myotomy: An emerging minimally invasive procedure for achalasia

    Science.gov (United States)

    Vigneswaran, Yalini; Ujiki, Michael B

    2015-01-01

    Peroral endoscopic myotomy (POEM) is an emerging minimally invasive procedure for the treatment of achalasia. Due to the improvements in endoscopic technology and techniques, this procedure allows for submucosal tunneling to safely endoscopically create a myotomy across the hypertensive lower esophageal sphincter. In the hands of skilled operators and experienced centers, the most common complications of this procedure are related to insufflation and accumulation of gas in the chest and abdominal cavities with relatively low risks of devastating complications such as perforation or delayed bleeding. Several centers worldwide have demonstrated the feasibility of this procedure in not only early achalasia but also other indications such as redo myotomy, sigmoid esophagus and spastic esophagus. Short-term outcomes have showed great clinical efficacy comparable to laparoscopic Heller myotomy (LHM). Concerns related to postoperative gastroesophageal reflux remain, however several groups have demonstrated comparable clinical and objective measures of reflux to LHM. Although long-term outcomes are necessary to better understand durability of the procedure, POEM appears to be a promising new procedure. PMID:26468336

  20. The Ross Procedure in Pediatric Patients: A 20-Year Experience of Ross Procedure in a Single Institution.

    Science.gov (United States)

    Yoon, Dong Woog; Yang, Ji-Hyuk; Jun, Tae-Gook; Park, Pyo Won

    2017-08-01

    The Ross/Ross-Konno procedure is considered a good option for irreparable aortic valve disease in pediatric patients because of its hemodynamic performance and potential for growth of the pulmonary autograft. This study is a review of the long-term results of our 20-year experience with the Ross and Ross-Konno operations in a single institution. Between June 1995 and January 2016, 16 consecutive patients (mean age, 6.0±5.9 years; range, 16 days to 17.4 years) underwent either a Ross operation (n=9) or a Ross-Konno operation (n=7). The study included 12 males and 4 females, with a median follow-up period of 47 months (range, 6 to 256 months). There were no cases of in-hospital or late mortality. Six reoperations were performed in 5 patients. Four patients underwent right ventricular-pulmonary artery (RV-PA) conduit replacement. Two patients underwent concomitant replacement of the pulmonary autograft and RV-PA conduit 10 years and 8 years after the Ross operation, respectively. The rate of freedom from adverse outcomes of the pulmonary autograft was 88% and 70% at 5 and 10 years, respectively. The rate of freedom from valve-related reoperations was 79% and 63% at 5 and 10 years, respectively. Pulmonary autografts demonstrated good durability with low mortality. The Ross/Ross-Konno procedure is a good option that can be performed safely in pediatric patients with aortic valve disease, even in a small-volume center.

  1. Consecutive operative procedures in patients with Marfan syndrome up to 28 years after initial aortic root surgery.

    Science.gov (United States)

    Puluca, Nazan; Burri, Melchior; Cleuziou, Julie; Krane, Markus; Lange, Rüdiger

    2018-02-28

    Most patients (75%) with Marfan syndrome present with aortic root dilatation that may require surgical intervention. However, associated cardiovascular disorders are not limited to the aortic root. These patients frequently require consecutive operations on the remaining thoracic aorta or the heart valves. Our intent was to characterize the spectrum of such procedures. Data from all patients with Marfan syndrome undergoing aortic root surgery at our centre between 1988 and 2016 were analysed retrospectively. Overall, 73 patients (26 women) were selected for the study. The median age at 1st operation was 30 years (3-68 years). Indications for aortic root surgery were aneurysm (78%) and dissection (22%). Initially, 33 Bentall procedures and 40 valve-sparing root replacement procedures were performed, with a 97% rate of follow-up completion. The median follow up was 8 years (0-28 years). Survival at 1, 10 and 15 years was 100%, 85% and 82%, respectively. During follow-up monitoring, 48 subsequent procedures were performed in 33 patients (aorta, 23; aortic valve, 11; mitral valve, 7 and combined procedures, 7). The 30-day mortality rate after subsequent procedures was 4.2%. Freedom from subsequent operation and death (combined end-point) after 5, 10 and 15 years was 70%, 53% and 34%, respectively. After the initial surgery, subsequent procedures required in the setting of Marfan syndrome most often involve the remaining native aorta, followed by the aortic and mitral valves. The continued need for additional operative procedures remains high, even decades after the initial surgeries are undertaken. Therefore, long-term patient monitoring at specialized centres is imperative.

  2. Assessment of safety levels in operation rooms at two major tertiary care public hospitals of Karachi. Safe surgery saves life

    International Nuclear Information System (INIS)

    Minhas, M.S.; Muzzammil, M.; Effendi, J.

    2017-01-01

    The objectives of this study are to determine the knowledge and attitude towards surgical safety among the health care professionals including surgeons, anaesthetist, hospital administrators, and operation room personnel and raise awareness towards the importance of safe surgery. Method: A pilot cross- sectional study of 543 healthcare providers working in the operating rooms and the surgical intensive care units was conducted in two tertiary care hospitals, within a study period of one month. A structured questionnaire was constructed and an informed verbal consent was taken. The questionnaire was then distributed; data collected and analysed on SPSS 20.0. Results: A total of 543 respondents participated in the study out of which there were 375 (69%) men and 168 (31%) women. The ages ranged between 23-58 years, mean 40.5+-24.74. There were 110 (20.25%) surgeons, 58 (10.68%) anaesthetist, 132 (24.30%) trainees, 125 (23.02%) technicians, and were 118 (21.73%) nurses. The question regarding briefing operation room personnel is important for patient safety was agreed by 532 (98%) respondents. Amongst the respondents, 239 (44%) did not feel safe to be operated in their own setup. Team communication improvement through the check list implementation was agreed by 483 (89%) respondents. 514 (94.7%) opted for the checklist to be used while they are being operated. That operation room personnel frequently disregard established protocols was agreed by 374 (69%) respondents. 193 (35.54%) of the respondents stated that it is difficult for them to speak up in the or if they perceive a problem with patient care. Conclusion: Operation room personnel were not aware of several important areas related to briefing, communication, safety attitude, following standard protocols and use of WHO Surgical Safety check list. A pre-post intervention study should be conducted after formal introduction of the Checklist. Successful implementation will require taking all stake holders on board

  3. Safe operation of critical assemblies and research reactors. Code of practice and Technical appendix. 1971 ed

    International Nuclear Information System (INIS)

    Cox, J.

    1971-01-01

    This book is in two parts. The first is a Code of Practice for the Safe Operation of Critical Assemblies and Research Reactors, prepared as a result of a meeting of experts which took place in Vienna on 20-24 May 1968. The Code has been prepared by the International Atomic Energy Agency in co-operation with the World Health Organization, and its publication is sponsored by both organizations. In addition, the Code was approved by the Board of Governors of the International Atomic Energy Agency on 16 December 1968 as part of the Agency's safety standards, which are applied to operations undertaken by Member States with the assistance of the Agency. The Board, in approving the publication of the present book, also recommended Member States to take the Code into account in the formulation of national regulations and recommendations. The second part of the book is a Technical Appendix to give information and illustrative samples that would be helpful in implementing the Code of Practice. This second part, although published under the same cover, is not part of the Code. An extensive Bibliography, amplifying the Technical Appendix, is included at the end.

  4. Operability test procedure for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    The purpose of this operability test procedure (OTP) is to verify the 211-BA flow proportional sampler system and components function correctly as intended by design. System test will include the sampling system, all associated instrumentation, and Facility Process Monitor and Control System (FPMCS). The combined chemical sewer stream from B Plant flows through sump 211BA-SMP-01 located in 211-BA and is continuously monitored for gamma and beta radiation and pH. 211-BA has been upgraded to include a flow proportional sampler. A specified sample volume will be withdrawn at programmed intervals from the 211BA sump and deposited in a 19 liter plastic carboy. The sampler will be programmed per the vendor installation and operations manual by B Plant instrument maintenance personnel. Samples will be taken during five consecutive sample cycles with the sample volumes and sample frequencies recorded for comparison purposes. Additional tests related to the sampler include the alarm circuitry for loss of power and failure to obtain sample

  5. Examination of a University-Affiliated Safe Ride Program

    Science.gov (United States)

    Gieck, D. Joseph; Slagle, David M.

    2010-01-01

    A university-affiliated safe ride program was evaluated to determine whether these programs can reduce drunk-driving related costs. Data was collected from 187 safe ride passengers during three nights of operation. Among the passengers, 93% were enrolled at a local University, 31% were younger than 21, and 40% reported a prior alcohol-related…

  6. Non-operative management for penetrating splenic trauma : how far can we go to save splenic function?

    NARCIS (Netherlands)

    Spijkerman, Roy; Teuben, Michel Paul Johan; Hoosain, Fatima; Taylor, Liezel Phyllis; Hardcastle, Timothy Craig; Blokhuis, Taco Johan; Warren, Brian Leigh; Leenen, Luke Petrus Hendrikus

    2017-01-01

    BACKGROUND: Selective non-operative management (NOM) for the treatment of blunt splenic trauma is safe. Currently, the feasibility of selective NOM for penetrating splenic injury (PSI) is unclear. Unfortunately, little is known about the success rate of spleen-preserving surgical procedures. The aim

  7. Quality performance-based training enhances safe and effective transport operations

    International Nuclear Information System (INIS)

    McCall, D.L.

    1993-01-01

    If the hazardous materials transportation industry is to reduce human error, reduce accidents, and improve its public image, there must be assurance that transportation personnel are properly trained and qualified to perform their jobs in a safe and efficient manner. This training must make them intimately aware of the hazards and risks associated with transport activities, ensure understanding of responsibilities and liabilities unique to their job, and ensure that they can competently perform functional duties vital to safety. To ensure that trained and qualified personnel are on the job, it is essential that the training be performance-based and require trainees to demonstrate functional proficiency. Performance-based training has proven to be a highly effective means of ensuring personnel are qualified to conduct their assignments safely and efficiently. This training is designed around the basic premise that training must be provided that supplies the information necessary for each worker to perform their assigned duties at a predetermined and acceptable level of expertise and skill. (J.P.N.)

  8. Standard Operating Procedures for Female Genital Sexual Pain

    DEFF Research Database (Denmark)

    Fugl-Meyer, Kerstin S; Bohm-Starke, Nina; Damsted Petersen, Christina

    2012-01-01

    Introduction.  Female genital sexual pain (GSP) is a common, distressing complaint in women of all ages that is underrecognized and undertreated. Definitions and terminology for female GSP are currently being debated. While some authors have suggested that GSP is not per se a sexual dysfunction......, but rather a localized genial pain syndrome, others adhere to using clearly sexually related terms such as dyspareunia and vaginismus. Aim.  The aims of this brief review are to present definitions of the different types of female GSP. Their etiology, incidence, prevalence, and comorbidity with somatic......-Meyer KS, Bohm-Starke N, Damsted Petersen C, Fugl-Meyer A, Parish S, and Giraldi A. Standard operating procedures for female genital sexual pain. J Sex Med **;**:**-**....

  9. Requirements for Computer Based-Procedures for Nuclear Power Plant Field Operators. Results from a Qualitative Study

    International Nuclear Information System (INIS)

    Le Blanc, Katya; Oxstrand, J.H.; Waicosky, T.

    2012-01-01

    Although computer-based procedures (CBPs) have been investigated as a way to enhance operator performance on procedural tasks in the nuclear industry for almost thirty years, they are not currently widely deployed at United States utilities. One of the barriers to the wide scale deployment of CBPs is the lack of operational experience with CBPs that could serve as a sound basis for justifying the use of CBPs for nuclear utilities. Utilities are hesitant to adopt CBPs because of concern over potential costs of implementation, and concern over regulatory approval. Regulators require a sound technical basis for the use of any procedure at the utilities; without operating experience to support the use CBPs, it is difficult to establish such a technical basis. In an effort to begin the process of developing a technical basis for CBPs, researchers at Idaho National Laboratory are partnering with industry to explore CBPs with the objective of defining requirements for CBPs and developing an industry-wide vision and path forward for the use of CBPs. This paper describes the results from a qualitative study aimed at defining requirements for CBPs to be used by field operators and maintenance technicians. (author)

  10. Phased Startup Initiative Phase 3 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, loaded into the Primary Clean Machine (PCM) for fuel cleaning, fuel sorted on the Process Table, then loaded back into fuel canisters and relocated in Basin Storage. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a base line to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  11. USING THE SAFE SYSTEM APPROACH TO KEEP OLDER DRIVERS SAFELY MOBILE

    Directory of Open Access Journals (Sweden)

    Jim LANGFORD

    2006-01-01

    Full Text Available In 2003, Australian road transport jurisdictions collectively accepted that the greatest road safety gains would be achieved through adopting a Safe System approach, derived from Sweden's Vision Zero and the Netherlands' Sustainable Safety strategies. A key objective of all three approaches is to manage vehicles, the road infrastructure, speeds, road users and the interactions between these components, to ensure that in the event of crashes, crash energies will remain at levels that minimize the probability of death and serious injury. Older drivers pose a particular challenge to the Safe System approach, given particularly their greater physical frailty, their driving patterns and for some at least, their reduced fitness to drive. This paper has analyzed the so-called ‘older driver problem’ and identified a number of key factors underpinning their crash levels, for which countermeasures can be identified and implemented within a Safe System framework. The recommended countermeasures consist of: (1 safer roads, through a series of design improvements particularly governing urban intersections; (2 safer vehicles, through both the promotion of crashworthiness as a critical consideration when purchasing a vehicle and the wide use of developed and developing ITS technologies; (3 safer speeds especially at intersections; and (4 safer road users, through both improved assessment procedures to identify the minority of older drivers with reduced fitness to drive and educational efforts to encourage safer driving habits particularly but not only through self-regulation.

  12. SNAP operating system reference manual

    International Nuclear Information System (INIS)

    Sabuda, J.D.; Polito, J.; Walker, J.L.; Grant, F.H. III.

    1982-03-01

    The SNAP Operating System (SOS) is a FORTRAN 77 program which provides assistance to the safeguards analyst who uses the Safeguards Automated Facility Evaluation (SAFE) and the Safeguards Network Analysis Procedure (SNAP) techniques. Features offered by SOS are a data base system for storing a library of SNAP applications, computer graphics representation of SNAP models, a computer graphics editor to develop and modify SNAP models, a SAFE-to-SNAP interface, automatic generation of SNAP input data, and a computer graphic post-processor for SNAP. The SOS Reference Manual provides detailed application information concerning SOS as well as a detailed discussion of all SOS components and their associated command input formats. SOS was developed for the US Nuclear Regulatory Commission's Office of Nuclear Regulatory Research and the US Naval Surface Weapons Center by Pritsker and Associates, Inc., under contract to Sandia National Laboratories

  13. Laparoscopic reversal of Hartmann's procedure

    DEFF Research Database (Denmark)

    Svenningsen, Peter Olsen; Bulut, Orhan; Jess, Per

    2010-01-01

    of Hartmann's procedure as safely as in open surgery and with a faster recovery, shorter hospital stay and less blood loss despite a longer knife time. It therefore seems reasonable to offer patients a laparoscopic procedure at departments which are skilled in laparoscopic surgery and use it for standard...

  14. SNAP Operating System (SOS) user's guide

    International Nuclear Information System (INIS)

    Sabuda, J.D.; Polito, J.; Walker, J.L.; Grant, F.H. III.

    1982-03-01

    The SNAP Operating System (SOS) is a FORTRAN 77 program which provides assistance to the safeguards analyst who uses the Safeguards Automated Facility Evaluation (SAFE) and the Safeguards Network Analysis Procedure (SNAP) techniques. Features offered by SOS are a data base system for storing a library of SNAP applications, computer graphics representation of SNAP models, a computer graphics editor to develop and modify SNAP models, a SAFE-to-SNAP interface, automatic generation of SNAP input data, and a computer graphics postprocessor for SNAP. The SOS User's Guide is designed to provide the user with the information necessary to use SOS effectively. Examples are used throughout to illustrate the concepts. The format of the user's guide follows the same sequence as would be used in executing an actual application

  15. Cold and compression in the management of musculoskeletal injuries and orthopedic operative procedures: a narrative review

    Directory of Open Access Journals (Sweden)

    Jon E Block

    2010-07-01

    Full Text Available Jon E BlockJon E Block, PhD., Incorporated, San Francisco, CA, USAAbstract: Cold and compression are routinely applied immediately after acute injury or ­following surgery to alleviate pain, reduce swelling and speed functional recovery. The objective of this literature review is to describe the published clinical findings regarding combined cold and compression therapy in the management of musculoskeletal injuries and after orthopedic operative procedures. Of 33 potential articles triaged, the findings of 21 randomized controlled trials were assessed and summarized. The findings reported by these 21 studies were largely subjective pain outcomes and, to a lesser degree, swelling and range of motion, and were inconsistent and divergent, making it difficult to recommend the most appropriate, effective clinical application of cold and compression. Further, 18 of the 21 reported studies evaluated cold and static compression, where the extent and duration of the compression was not uniform within or across studies. Operative procedures may offer a more controlled environment for rigorous investigations. However, such studies must be powered sufficiently to account for variations in surgical procedure that could affect outcomes. More uniform operative procedures, such as total knee arthroplasty, represent a well circumscribed intervention for studying the clinical utility of cold compression therapy because the operative technique is standardized, surgical tissue damage is extensive, intraoperative blood loss is high, and post-operative edema and pain are severe. Findings from randomized controlled trials of knee arthroplasty generally showed cold compression therapy provides better outcomes such as pain relief than alternative interventions. While the effects of cold and static compression are clearly better than no treatment, they do not appear to be directly additive.Keywords: cryotherapy, injury

  16. 33 CFR Appendix D to Part 157 - Example of a Procedure for Dedicated Clean Ballast Tanks Operations

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Example of a Procedure for... ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Pt. 157, App. D Appendix D to Part 157—Example of a Procedure for Dedicated Clean Ballast Tanks Operations 1. Source. The example procedure for dedicated clean...

  17. Safety and emergency preparedness considerations for geotechnical field operations

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.

    1989-04-01

    The GEO Energy Technology Department at Sandia National Laboratories is involved in several remote-site drilling and/or experimental operations each year. In 1987, the Geothermal Research Division of the Department developed a general set of Safe Operating Procedures (SOPs) that could be applied to a variety of projects. This general set is supplemented by site-specific SOPs as needed. Effective field operations require: integration of safety and emergency preparedness planning with overall project planning, training of field personnel and inventorying of local emergency support resources, and, developing a clear line of responsibility and authority to enforce the safety requirements. Copies of SOPs used in recent operations are included as examples of working documents for the reader.

  18. Standard operating procedures improve acute neurologic care in a sub-Saharan African setting.

    Science.gov (United States)

    Jaiteh, Lamin E S; Helwig, Stefan A; Jagne, Abubacarr; Ragoschke-Schumm, Andreas; Sarr, Catherine; Walter, Silke; Lesmeister, Martin; Manitz, Matthias; Blaß, Sebastian; Weis, Sarah; Schlund, Verena; Bah, Neneh; Kauffmann, Jil; Fousse, Mathias; Kangankan, Sabina; Ramos Cabrera, Asmell; Kronfeld, Kai; Ruckes, Christian; Liu, Yang; Nyan, Ousman; Fassbender, Klaus

    2017-07-11

    Quality of neurologic emergency management in an under-resourced country may be improved by standard operating procedures (SOPs). Neurologic SOPs were implemented in a large urban (Banjul) and a small rural (Brikama) hospital in the Gambia. As quality indicators of neurologic emergency management, performance of key procedures was assessed at baseline and in the first and second implementation years. At Banjul, 100 patients of the first-year intervention group exhibited higher rates of general procedures of emergency management than 105 control patients, such as neurologic examination (99.0% vs 91.4%; p process quality of neurologic emergency management in under-resourced settings. This study provides Class IV evidence that, for patients with suspected neurologic emergencies in sub-Saharan Africa, neurologic SOPs increase the rate of performance of guideline-recommended procedures. Copyright © 2017 The Author(s). Published by Wolters Kluwer Health, Inc. on behalf of the American Academy of Neurology.

  19. Gap nonunion of tibia treated by Huntington′s procedure

    Directory of Open Access Journals (Sweden)

    Zile S Kundu

    2012-01-01

    Full Text Available Background: Gap nonunion that may occur following trauma or infection is a challenging problem to treat. The patients with intact or united fibula, preserved sensation in the sole, and adequate vascularity, were managed by tibialization (medialization of the fibula (Huntington′s procedure, to restore continuity of the tibia. The goal of this retrospective analysis study is to report the mid-term results following the Huntington′s procedure. Materials and Methods: 22 patients (20 males and two females age 16-34 years with segmental tibial loss more than 6 cm were operated for tibialization of fibula. The procedure was two-staged in seven and single-staged in the rest 15 patients, where the lateral aspect of the leg was relatively supple. In the two-staged procedure, the distal tibiofibular synostosis was performed six-to-eight weeks after the proximal procedure. Weightbearing (protected was started in a long leg cast after six-to-eight weeks of the second stage and continued for six-to-eight months, followed by the use of a brace. Results: The fibula started showing signs of hypertrophy within the first year after the procedure and it was more than double in breath after the four-year period. Full and unprotected weightbearing on the operated leg was achieved at an average time of 16 months. At the final followup, ten patients were very satisfied, seven satisfied, and five fairly satisfied. One patient had persistent nonunion at the proximal synostotic site even after bone grafting and secondary fixation. Conclusion: Huntington′s procedure is a safe and simple salvage procedure and remains an excellent option for treating difficult infected nonunion of the tibia in the selected indications.

  20. InaSAFE applications in disaster preparedness

    Science.gov (United States)

    Pranantyo, Ignatius Ryan; Fadmastuti, Mahardika; Chandra, Fredy

    2015-04-01

    Disaster preparedness activities aim to reduce the impact of disasters by being better prepared to respond when a disaster occurs. In order to better anticipate requirements during a disaster, contingency planning activities can be undertaken prior to a disaster based on a realistic disaster scenario. InaSAFE is a tool that can inform this process. InaSAFE is a free and open source software that estimates the impact to people and infrastructure from potential hazard scenarios. By using InaSAFE, disaster managers can develop scenarios of disaster impacts (people and infrastructures affected) to inform their contingency plan and emergency response operation plan. While InaSAFE provides the software framework exposure data and hazard data are needed as inputs to run this software. Then InaSAFE can be used to forecast the impact of the hazard scenario to the exposure data. InaSAFE outputs include estimates of the number of people, buildings and roads are affected, list of minimum needs (rice and clean water), and response checklist. InaSAFE is developed by Indonesia's National Disaster Management Agency (BNPB) and the Australian Government, through the Australia-Indonesia Facility for Disaster Reduction (AIFDR), in partnership with the World Bank - Global Facility for Disaster Reduction and Recovery (GFDRR). This software has been used in many parts of Indonesia, including Padang, Maumere, Jakarta, and Slamet Mountain for emergency response and contingency planning.

  1. BWR emergency procedure guidelines

    International Nuclear Information System (INIS)

    Post, J.S.; Karner, E.F.; Stratman, R.A.

    1984-01-01

    This chapter describes plans for dealing with reactor accidents developed by the Boiling Water Reactor (BWR) Owners' Group in response to post-Three Mile Island US NRC requirements. The devised Emergency Procedure Guidelines (EPGs), applicable to all BWRs, are symptom-based rather than event-based. According to the EPGs, the operator does not need to identify what event is occurring in the plant in order to decide what action to take, but need only observe the symptoms (values and trends of key control parameters) which exist and take appropriate action to control these symptoms. The original objective was to provide reactor operator guidance in responding to a small break loss-of-coolant accident (LOCA), but subsequent revisions have included other types of reactor accidents. Topics considered include the reactor pressure vessel (RPV) control guideline, the primary containment control guideline, the secondary containment control guideline, the radioactivity release control guideline, multiple failures vs. the design basis, safe limits vs. technical specifications, the technical status, licensing, and implementation. The EPGs are based upon maintaining both adequate core cooling and primary containment integrity

  2. Strategies and challenges for safe injection practice in developing countries

    OpenAIRE

    Gyawali, Sudesh; Rathore, Devendra Singh; Shankar, P Ravi; Kumar, KC Vikash

    2013-01-01

    Injection is one of the important health care procedures used globally to administer drugs. Its unsafe use can transmit various blood borne pathogens. This article aims to review the history and status of injection practices, its importance, interventions and the challenges for safe injection practice in developing countries. The history of injections started with the discovery of syringe in the early nineteenth century. Safe injection practice in developed countries was initiated in the earl...

  3. Ageing management and knowledge base for safe long-term operation of japanese light water reactors

    International Nuclear Information System (INIS)

    Sekimura, N.

    2008-01-01

    There are 55 operating commercial light water reactor plants (32 BWRs and 23 PWRs) in Japan. Twelve (12) plants have been operating for more than 30 years. Utility companies are required to perform an 'Ageing Management Technical Assessment' be-fore the end of 30 years operation of each plant. The assessments for each plant have been evaluated by the Nuclear and Industry Safety Agency (NISA) of the Ministry of Economy Trade and Industry (WTI) for these 12 plants. The Japan Nuclear Energy Safety Organisation (JNES) has compiled Technical Review Manuals for six major degradation phenomena for the evaluation of Ageing Management Technical Assessment. A 'Road-map for Ageing and Plant Life Management' was established in 2005 by the Special Committee in the Atomic Energy Society of Japan under the commission from the JNES. Within the framework of the road-map, the major research and development fields are divided into the following four categories: 1) engineering information systems; 2) research and development of technologies for inspection, evaluation and repair of the components and materials; 3) development of codes and standards; 4) synthesised maintenance engineering. Continuous revision of the 'Strategy Maps for Ageing Management and Safe Long-term Operation' has been performed under the Coordinating Committee of Ageing Management to promote research and development activities by industries, government and academia, effectively and efficiently. Systematic development of the information basis for database and knowledge-base has been undertaken in addition to the development of codes and standards by academic societies through intensive domestic safety research collaborations and international collaboration. (author)

  4. Measures aimed at enhancing safe operation of the Nigeria Research Reactor-1 (NIRR-1)

    International Nuclear Information System (INIS)

    Balogun, G.I.; Jonah, S.A.; Umar, I.M.

    2005-01-01

    Safety culture has been defined as 'that assembly of characteristics and attitudes in organizations and individuals which establishes that as an overriding priority, nuclear plant safety issues receive the attention warranted by their significance'. This paper briefly highlights efforts being made at the Centre for Energy Research and Training (CERT) towards realizing this broad objective as far as possible. To this end CERT realizes the need for instituted safety measures to reflect significant, site-specific peculiar characteristics of any generic reactor types. Consequently, standard procedures for pre-startup, startup and shutdown of NIRR-1 (a miniature neutron source reactor - MNSR) have been reviewed to reflect our local conditions and peculiarities. The review has revealed the need to incorporate important steps that impact on overall safety of the facility. For instance an interlocking system is being considered between NIRR-1 startup on the one hand and mandatory pre-startup measures on the other. Also a procedure has been put in place that would facilitate rapid response in the event of a rod-stuck-at-full-withdrawal incident. Furthermore, a program of automation of important analysis and design calculations of MNSRs is going on. Emphases are also placed, and deliberate efforts are being made, to ensure that a working atmosphere prevails that would foster the correct attitudinal approach to matters of reactor safety. A regime of constant dialogue and discussions amongst operating personnel has been factored into the overall operational program. (author)

  5. Fuel Transfer Cask; Procedure Option and Radiation Protection during Transferring the Spent Fuel

    International Nuclear Information System (INIS)

    Muhammad Khairul Ariff Mustafa; Nurhayati Ramli; Ahmad Nabil Abdul Rahim; Mohd Fazli Zakaria

    2011-01-01

    Reactor TRIGA PUSPATI (RTP) has been operating almost 30 years. Many components are ageing. Nuclear Malaysia has taken an initiative to manage this ageing problem to prolong the life of the reactor. Hence, reactor upgrading project already commence started with the reactor console. To upgrade the core, all the fuel must be taken out from the core. A conceptual design of fuel transfer cask already done. This paper will discuss about the option of safe working procedure for transferring the fuel to the spent fuel pool for temporary. Hence, radiation protection for operator should be considered during the process. (author)

  6. Is Office-Based Surgery Safe? Comparing Outcomes of 183,914 Aesthetic Surgical Procedures Across Different Types of Accredited Facilities.

    Science.gov (United States)

    Gupta, Varun; Parikh, Rikesh; Nguyen, Lyly; Afshari, Ashkan; Shack, R Bruce; Grotting, James C; Higdon, K Kye

    2017-02-01

    There has been a dramatic rise in office-based surgery. However, due to wide variations in regulatory standards, the safety of office-based aesthetic surgery has been questioned. This study compares complication rates of cosmetic surgery performed at office-based surgical suites (OBSS) to ambulatory surgery centers (ASCs) and hospitals. A prospective cohort of patients undergoing cosmetic surgery between 2008 and 2013 were identified from the CosmetAssure database (Birmingham, AL). Patients were grouped by type of accredited facility where the surgery was performed: OBSS, ASC, or hospital. The primary outcome was the incidence of major complication(s) requiring emergency room visit, hospital admission, or reoperation within 30 days postoperatively. Potential risk factors including age, gender, body mass index (BMI), smoking, diabetes, type of procedure, and combined procedures were reviewed. Of the 129,007 patients (183,914 procedures) in the dataset, the majority underwent the procedure at ASCs (57.4%), followed by hospitals (26.7%) and OBSS (15.9%). Patients operated in OBSS were less likely to undergo combined procedures (30.3%) compared to ASCs (31.8%) and hospitals (35.3%, P procedures. Plastic surgeons should continue to triage their patients carefully based on other significant comorbidities that were not measured in this present study. LEVEL OF EVIDENCE 3. © 2016 The American Society for Aesthetic Plastic Surgery, Inc. Reprints and permission: journals.permissions@oup.com.

  7. Inherently safe in situ uranium recovery

    International Nuclear Information System (INIS)

    Krumhansl, James Lee; Beauheim, Richard Louis; Brady, Patrick Vane; Arnold, Bill Walter; Kanney, Joseph F.; McKenna, Sean Andrew

    2009-01-01

    Expansion of uranium mining in the United States is a concern to some environmental groups and sovereign Native American Nations. An approach which may alleviate some problems is to develop inherently safe in situ uranium recovery ('ISR') technologies. Current ISR technology relies on chemical extraction of trace levels of uranium from aquifers that, once mined, can still contain dissolved uranium and other trace metals that are a health concern. Existing ISR operations are few in number; however, high uranium prices are driving the industry to consider expanding operations nation-wide. Environmental concerns and enforcement of the new 30 ppb uranium drinking water standard may make opening new mining operations more difficult and costly. Here we propose a technological fix: the development of inherently safe in situ recovery (ISISR) methods. The four central features of an ISISR approach are: (1) New 'green' leachants that break down predictably in the subsurface, leaving uranium, and associated trace metals, in an immobile form; (2) Post-leachant uranium/metals-immobilizing washes that provide a backup decontamination process; (3) An optimized well-field design that increases uranium recovery efficiency and minimizes excursions of contaminated water; and (4) A combined hydrologic/geochemical protocol for designing low-cost post-extraction long-term monitoring. ISISR would bring larger amounts of uranium to the surface, leave fewer toxic metals in the aquifer, and cost less to monitor safely - thus providing a 'win-win-win' solution to all stakeholders.

  8. Safe sex

    Science.gov (United States)

    ... sex; Sexually transmitted - safe sex; GC - safe sex; Gonorrhea - safe sex; Herpes - safe sex; HIV - safe sex; ... contact. STIs include: Chlamydia Genital herpes Genital warts Gonorrhea Hepatitis HIV HPV Syphilis STIs are also called ...

  9. Psychological characteristics of licensed nuclear power plant operators

    International Nuclear Information System (INIS)

    Sajwaj, T.; Ford, T.; McGee, R.K.

    1987-01-01

    The safe production of electricity by nuclear power plants has been the focus of considerable attention. Much of this concern has been focused on equipment and procedural issues, with less attention to the psychological factors that affect the operations staff of the plants, i.e., those individuals who are most directly responsible for a plant's operations. Stress and type A qualities would be significant for these individuals because of their relationships to job performance and health. Of equal significance would be work-related factors, such as job involvement and work pressure. Also of interest would be hostile tendencies because of the need for cooperation and communications among operations staff. Two variables could influence these psychological factors. One is the degree of responsibility for a plant's nuclear reactors. The individuals with the greatest responsibility are licensed by the US Nuclear Regulatory Commission (NRC). There are also individuals with less direct responsibilities who are not licensed. A second variable is the operating status of the plant, whether or not the plant is currently producing electricity. Relative to ensuring the safe operation of nuclear power plants, these data suggest a positive view of licensed operators. Of interest are the greater stress scores in the licensed staff of the operating plant in contrast with their peers in the nonoperating plant

  10. Allied-General operator training program

    International Nuclear Information System (INIS)

    Ayers, A.L.; Ebel, P.E.

    1975-01-01

    All operators at Allied-General Nuclear Services are initially trained in the basic concepts of radiation and radiation protection, they are drilled in the basic technical tools needed for further training, they are instructed in the design and operation of the Barnwell Nuclear Fuel Plant, and they are introduced to the actual operations via operating procedures. This all occurs during the Before-the-Baseline training phase and then the operators move on Beyond-the-Baseline. There they physically learn how to do their job at their own pace using checklists as a guide. All operators are then internally certified. Progression is based on demonstrated ability and those that qualify go on to jobs requiring NRC licenses. Upon internal certification, retraining commences immediately and will continue in its four month, one year, and two year cycles. Current feedback from the various classes that have completed the courses and are now in the retraining program indicates that this combination of initial technical training, on-the-job training, and retraining will produce and maintain effective, safe, and efficient operators

  11. Is intrauterine exchange transfusion a safe procedure for management of fetal anaemia?

    Science.gov (United States)

    Garabedian, C; Philippe, M; Vaast, P; Wibaut, B; Salleron, J; Delsalle, A; Rakza, T; Subtil, D; Houfflin-Debarge, V

    2014-08-01

    To study modalities and complications of intrauterine exchange transfusion (IUET) for the management of severe fetal anaemia. Retrospective study of all IUET procedures performed between January 1999 and January 2012 at a regional centre. Characteristics of each procedure were studied to identify risk factors for complications. Survival rates according to the different aetiologies of anaemia were evaluated. In total, 225 IUET procedures were performed in 96 fetuses. Major indications were feto-maternal erythrocyte alloimmunization (n=80/96, 83.3%) and parvovirus B19 infection (n=13/96, 13.5%). Twenty-six percent of the fetuses (25/96) had hydrops fetalis before the first IUET. Intrauterine fetal death occurred after 2.7% (6/225) of procedures, premature rupture of the membranes occurred after 0.9% (2/225) of procedures, and emergency caesarean section was required after 3.6% (8/225) of procedures. Fetal bradycardia [odds ratio (OR) 37, 95% confidence interval (CI) 8.3-170; prate in the study cohort was 87.5% (84/96): 90% (72/80) in the alloimmunization group and 76.9% (10/13) in the parvovirus-infected group (NS). IUET has a higher complication rate than simple intrauterine transfusion, and should be performed by well-trained specialists. Copyright © 2014. Published by Elsevier Ireland Ltd.

  12. GRUKON - A package of applied computer programs system input and operating procedures of functional modules

    International Nuclear Information System (INIS)

    Sinitsa, V.V.; Rineiskij, A.A.

    1993-04-01

    This manual describes a software package for the production of multigroup neutron cross-sections from evaluated nuclear data files. It presents the information necessary for the implementation of the program's modules in the framework of the execution of the program, including: operating procedures of the program, the data input, the macrocommand language, the assignment of the system's procedures. This report also presents the methodology used in the coding of the individual modules: the rules, the syntax, the method of procedures. The report also presents an example of the application of the data processing module. (author)

  13. Aesthetic Surgical Procedures in Men: Major Complications and Associated Risk Factors.

    Science.gov (United States)

    Kaoutzanis, Christodoulos; Winocour, Julian; Yeslev, Max; Gupta, Varun; Asokan, Ishan; Roostaeian, Jason; Grotting, James C; Higdon, K Kye

    2018-03-14

    The number of men undergoing cosmetic surgery is increasing in North America. To determine the incidence and risk factors of major complications in males undergoing cosmetic surgery, compare the complication profiles between men and women, and identify specific procedures that are associated with higher risk of complications in males. A prospective cohort of patients undergoing cosmetic surgery between 2008 and 2013 was identified from the CosmetAssure database. Gender specific procedures were excluded. Primary outcome was occurrence of a major complication in males requiring emergency room visit, hospital admission, or reoperation within 30 days of the index operation. Univariate and multivariate analysis evaluated potential risk factors for major complications including age, body mass index (BMI), smoking, diabetes, type of surgical facility, type of procedure, and combined procedures. Of the 129,007 patients, 54,927 underwent gender nonspecific procedures, of which 5801 (10.6%) were males. Women showed a higher mean age (46.4 ± 14.1 vs 45.2 ± 16.7 years, P procedures (RR 3.47), and combined procedures (RR 2.56). Aesthetic surgery in men is safe with low major complication rates. Modifiable predictors of complications included BMI and combined procedures.

  14. Development of a VR training system of robotic peroral operation procedure for endoscopic surgery of digestive tracts

    International Nuclear Information System (INIS)

    Suzuki, Naoki; Hattori, Asaki; Tanoue, Kazuo; Ieiri, Satoshi; Konishi, Kozo; Tomikawa, Morimasa; Kenmotsu, Hajime; Hashizume, Makoto

    2010-01-01

    This report presents the development of a VR (virtual real) training system of robotic peroral operation procedure for endoscopic resection of gastric mucosa as the training is essential because the procedure differs from usual one hitherto. For VR operation space, used is reporters' sphere-filled organ model (SFM), which is deformed by and repels to, the outside force as a soft tissue rapidly in the real time. The deformation and repellence are computable. The SFM space is reconstructed to 3D of the inner environment of stomach using MRI data. The endoscope has, at the right and left side of its top, 2 arms of inner needle knife-equipped robotic forceps and is inserted perorally for operation. In VR, the forceps can grab the gastric mucosa, cut it with the knife to complete resection and carry the specimen out of the body. For the procedure training, the time required for hemostasis, bleeding volume, trace of the arms, intensity and direction of the outer force given are recorded, with which trainee's safety and degree of skill are evaluable in VR. Hydration step and clipping to close the wound are to be further added in the procedure. (T.T.)

  15. RECOMMENDED OPERATING PROCEDURE NO. 56: COLLECTION OF GASEOUS GRAB SAMPLES FROM COMBUSTION SOURCES FOR NITROUS OXIDE MEASUREMENT

    Science.gov (United States)

    The document is a recommended operating procedure, prepare or use in research activities conducted by EPA's Air and Energy Engineering Research Laboratory (AEERL). The procedure applies to the collection of gaseous grab samples from fossil fuel combustion sources for subsequent a...

  16. The step complexity measure for emergency operating procedures - comparing with simulation data

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Kim, Jaewhan; Ha, Jaejoo; Shin, Yunghwa

    2001-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. Therefore, to prevent occurrences of accidents or to ensure system safety, extensive effort has been made to identify significant factors that cause human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors, and complexity or understandability of a procedure is pointed out as one of the major reasons that make procedure-related human errors. Many qualitative checklists are suggested to evaluate emergency operating procedures (EOPs) of NPPs. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is imperative to compensate for them. In order to quantify the complexity of EOPs, Park et al. suggested the step complexity (SC) measure to quantify the complexity of a step included in EOPs. In this paper, to ensure the appropriateness of the SC measure, SC scores are compared with averaged step performance time data obtained from emergency training records. The total number of available records is 36, and training scenarios are the loss of coolant accident and the excess steam dump event. The number of scenario is 18 each. From these emergency training records, step performance time data for 39 steps are retrieved, and they are compared with estimated SC scores of them. In addition, several questions that are needed to clarify the appropriateness of the SC measure are also discussed. As a result, it was observed that estimated SC scores and step performance time data have a statistically meaningful correlation. Thus, it can be concluded that the SC measure can quantify the complexity of steps included in EOPs

  17. A note on the implementation of variational procedures involving Green's operators

    Energy Technology Data Exchange (ETDEWEB)

    Blakemore, M; Evans, G A; Hyslop, J

    1975-12-01

    The numerical implementation of a minimum energy principle for atoms and molecules involving integral operators is discussed. It is demonstrated that the use of unscaled trial functions may be as convenient computationally as the earlier procedures involving scaled trial functions and that the revised prescription has advantages, mainly in ease of interpretation and comparison of results. By way of illustration, some earlier calculations on the hydrogen ion are reconsidered and compared. (auth)

  18. Authorization procedure for the construction and operation of nuclear installations within the EC Member States, including supervision and control

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Didier, J.M.

    1978-01-01

    This report is an updating of the report EUR 5284, Authorization procedure for the construction and operation of nuclear installations within the EEC Member States, prepared in 1974 by J.M. Didier and Associates. Recent developments regarding the authorization procedure for the construction and operation of nuclear installations have taken place in Italy (introduction of a site approval procedure) and in Denmark (adoption of an overall legislation on the subject, however not yet in force). With respect to supervision and control of nuclear installations during construction and operation, competences of, as well as their exercise by, supervisory authorities in all EC Member States, with the exception of Ireland, are also analysed in the current study

  19. Training aids: the motor operator valve trainer

    International Nuclear Information System (INIS)

    McCulloch, B.

    1987-01-01

    The spectrum of training aids used in the nuclear industry runs the gamut from the very basic (i.e., valve training aids - gate, globe, check) to the highly complex (i.e., nuclear full scope simulator). Designing and purchasing the best training aids take much time, detailed investigation, and good understanding of plant operations. The training aid that has given the New York Power Authority the best results has been the motor operator valve (MOV) trainer. Some of the items that make the MOV trainer a good choice are: (1) large number of MOVs in the plant, (2) importance of MOVs to safe plant operation, (3) detailed MOV procedures used by the plant, (4) history of MOV problems, and (5) ability to demonstrate important concepts and operation - hammer blow effect, torque and limit switch adjustment and functions, and actual sequence of operation of the limitorque valve operator

  20. Safe handling of tritium

    International Nuclear Information System (INIS)

    1991-01-01

    The main objective of this publication is to provide practical guidance and recommendations on operational radiation protection aspects related to the safe handling of tritium in laboratories, industrial-scale nuclear facilities such as heavy-water reactors, tritium removal plants and fission fuel reprocessing plants, and facilities for manufacturing commercial tritium-containing devices and radiochemicals. The requirements of nuclear fusion reactors are not addressed specifically, since there is as yet no tritium handling experience with them. However, much of the material covered is expected to be relevant to them as well. Annex III briefly addresses problems in the comparatively small-scale use of tritium at universities, medical research centres and similar establishments. However, the main subject of this publication is the handling of larger quantities of tritium. Operational aspects include designing for tritium safety, safe handling practice, the selection of tritium-compatible materials and equipment, exposure assessment, monitoring, contamination control and the design and use of personal protective equipment. This publication does not address the technologies involved in tritium control and cleanup of effluents, tritium removal, or immobilization and disposal of tritium wastes, nor does it address the environmental behaviour of tritium. Refs, figs and tabs

  1. Prevalence of gallstones in 1,229 patients submitted to surgical laparoscopic treatment of GERD and esophageal achalasia: associated cholecystectomy was a safe procedure.

    Science.gov (United States)

    Sallum, Rubens Antonio Aissar; Padrão, Eduardo Messias Hirano; Szachnowicz, Sergio; Seguro, Francisco C B C; Bianchi, Edno Tales; Cecconello, Ivan

    2015-01-01

    Association between esophageal achalasia/ gastroesophageal reflux disease (GERD) and cholelithiasis is not clear. Epidemiological data are controversial due to different methodologies applied, the regional differences and the number of patients involved. Results of concomitant cholecistectomy associated to surgical treatment of both diseases regarding safety is poorly understood. To analyze the prevalence of cholelithiasis in patients with esophageal achalasia and gastroesophageal reflux submitted to cardiomyotomy or fundoplication. Also, to evaluate the safety of concomitant cholecistectomy. Retrospective analysis of 1410 patients operated from 2000 to 2013. They were divided into two groups: patients with GERD submitted to laparocopic hiatoplasty plus Nissen fundoplication and patients with esophageal achalasia to laparoscopic cardiomyotomy plus partial fundoplication. It was collected epidemiological data, specific diagnosis and subgroups, the presence or absence of gallstones, surgical procedure, operative and clinical complications and mortality. All groups/subgroups were compared. From 1,229 patients with GERD or esophageal achalasia, submitted to laparoscopic cardiomyotomy or fundoplication, 138 (11.43%) had cholelitiasis, occurring more in females (2.38:1) with mean age of 50,27 years old. In 604 patients with GERD, 79 (13,08%) had cholelitiasis. Lower prevalence occurred in Barrett's esophagus patients 7/105 (6.67%) (p=0.037). In 625 with esophageal achalasia, 59 (9.44%) had cholelitiasis, with no difference between chagasic and idiopathic forms (p=0.677). Complications of patients with or without cholecystectomy were similar in fundoplication and cardiomyotomy (p=0.78 and p=1.00).There was no mortality or complications related to cholecystectomy in this series. Prevalence of cholelithiasis was higher in patients submitted to fundoplication (GERD). Patients with chagasic or idiopatic forms of achalasia had the same prevalence of cholelithiasis. Gallstones

  2. Hazard and operability study (Haz Op) of the 2 MW IEA-R1 reactor startup procedures

    International Nuclear Information System (INIS)

    Sauer, Maria E.L.J.; Correa, Francisco; Sara Neto, Antonio J.; Costa, Carlos A.R. da; Santos, Cilas C. dos; Cardenas, Jose P.N.; Berretta, Jose R.; Neves Conti, Thadeu das

    1997-01-01

    This work presents the Hazard and Operability Study (Haz Op) applied to startup procedures of the 2 MW IEA-R1 research reactor, at IPEN/CNEN-S P. The Haz Op was developed by reviewing the procedures of the installation startup, in order to identify hazards and/or operational problems caused by deviations in the execution of these routines. This paper summarizes this study. describing some potential problems of relevant importance to safety as well as preventives and/or correctives measures to avoid their occurrence. Besides, an benefits evaluation and the technique limitations is made. (author). 5 refs., 1 tab

  3. LACK OF AWARENESS ABOUT SAFE BLOOD IN PAKISTANI POPULATION

    Directory of Open Access Journals (Sweden)

    Muhammad Usman

    2014-12-01

    Full Text Available Blood transfusion is a life saving procedure in various transfusion-dependent life threatening conditions and donation of safe blood is a prerequisite for achieving this goal. This study was designed to evaluate the awareness regarding “safe blood” in Pakistani population. This study was conducted at a large scale through a population survey. The test population was divided into two groups i.e. general population and students. The Performa was designed for a general and student population and included 20 questions related to awareness of safe blood. A total of 4900 individuals belonging to different ethnic groups were included in this population survey. Results of social survey were analyzed by using Usman and Moin awareness chart. Results of this study revealed profound unawareness about safe blood in Pakistani population. This study found lack of awareness about safe blood as a major factor that is playing a vital role in the propagation of blood borne diseases in Pakistan. To secure the recipients from blood borne complications through blood donation, it is necessary to create effective awareness about safe blood in Pakistani population.

  4. Development of Safe Food Handling Guidelines for Korean Consumers.

    Science.gov (United States)

    Kang, Hee-Jin; Lee, Min-Woo; Hwang, In-Kyeong; Kim, Jeong-Weon

    2015-08-01

    The purpose of this study was to develop guidelines for Korean consumers with regard to safe food handling practices at home by identifying current food handling issues. Korean consumers' behaviors regarding their safe food handling were identified via survey questionnaires that included items on individual hygiene practices, prepreparation steps when cooking, the cooking process, and the storage of leftover foods. The subjects were 417 Korean parents with elementary school children living in Seoul and Gyeonggi Province in the central area of Korea. The survey results revealed gaps between the knowledge or practices of Korean consumers and scientific evidence pertaining to safe food handling practices. Based on these findings, a leaflet on safe food handling guidelines was developed in accordance with Korean food culture. These guidelines suggest personal hygiene practices as well as fundamental principles and procedures for safe food handling from the stage of food purchase to that of keeping leftover dishes. A pilot application study with 50 consumers revealed that the guidelines effectively improved Korean consumers' safe food handling practices, suggesting that they can serve as practical educational material suitable for Korean consumers.

  5. Field Operations and Enforcement Manual for Air Pollution Control. Volume III: Inspection Procedures for Specific Industries.

    Science.gov (United States)

    Weisburd, Melvin I.

    The Field Operations and Enforcement Manual for Air Pollution Control, Volume III, explains in detail the following: inspection procedures for specific sources, kraft pulp mills, animal rendering, steel mill furnaces, coking operations, petroleum refineries, chemical plants, non-ferrous smelting and refining, foundries, cement plants, aluminum…

  6. Time cycle calculation procedure for the special crew during the mining mobile machine complex operation

    International Nuclear Information System (INIS)

    Shmurygin, V; Lukyanov, V; Maslovsky, A

    2015-01-01

    The relevance of the research is specified by the necessity to optimize the delft mobile tunneling equipment operation. Target of the research is tunneling time cycle justification for the special crew during the mining mobile machine complex operation. Methods of the research included the consideration of operation organization schemes in the drifting face and effective use of the mobile equipment during mine exploratory working operations. Time cycle calculation procedures for major processes have been considered. This has been done for the special crew during the mobile machine complex operations for several working faces and various organization schemes

  7. OR.NET: a service-oriented architecture for safe and dynamic medical device interoperability.

    Science.gov (United States)

    Kasparick, Martin; Schmitz, Malte; Andersen, Björn; Rockstroh, Max; Franke, Stefan; Schlichting, Stefan; Golatowski, Frank; Timmermann, Dirk

    2018-02-23

    Modern surgical departments are characterized by a high degree of automation supporting complex procedures. It recently became apparent that integrated operating rooms can improve the quality of care, simplify clinical workflows, and mitigate equipment-related incidents and human errors. Particularly using computer assistance based on data from integrated surgical devices is a promising opportunity. However, the lack of manufacturer-independent interoperability often prevents the deployment of collaborative assistive systems. The German flagship project OR.NET has therefore developed, implemented, validated, and standardized concepts for open medical device interoperability. This paper describes the universal OR.NET interoperability concept enabling a safe and dynamic manufacturer-independent interconnection of point-of-care (PoC) medical devices in the operating room and the whole clinic. It is based on a protocol specifically addressing the requirements of device-to-device communication, yet also provides solutions for connecting the clinical information technology (IT) infrastructure. We present the concept of a service-oriented medical device architecture (SOMDA) as well as an introduction to the technical specification implementing the SOMDA paradigm, currently being standardized within the IEEE 11073 service-oriented device connectivity (SDC) series. In addition, the Session concept is introduced as a key enabler for safe device interconnection in highly dynamic ensembles of networked medical devices; and finally, some security aspects of a SOMDA are discussed.

  8. The development of a quantitative measure for the complexity of emergency tasks stipulated in emergency operating procedures of nuclear power plants

    International Nuclear Information System (INIS)

    Park, Jin Kyun; Jung, Won Dea

    2006-11-01

    Previous studies have continuously pointed out that human performance is a decisive factor affecting the safety of complicated process systems. Subsequently, as the result of extensive efforts, it has been revealed that the provision of procedures is one of the most effective countermeasures, especially if human operators have to carry out their tasks under a very stressful environment. That is, since good procedures are helpful to not only enhance the performance of human operators but also the reduction of the possibility of a human error through stipulating detailed tasks to be done by human operators. Ironically, it has been emphasized that the performance of human operators could be impaired due to complicated procedures, because procedures directly govern the physical as well as cognitive behavior of human operators by institutionalizing detailed actions. Therefore, it is a prerequisite to develop a systematic framework that properly evaluate the complexity of tasks described in procedures. For this reason, a measure called TACOM (Task Complexity) that can quantify the complexity of emergency tasks described in the emergency operating procedures (EOPs) of NPPs has been developed. In this report, a technical background as well as practical steps to quantify the complexity of tasks were presented with a series of studies that were conducted to ensure the validity of the TACOM measure. As a result of validation studies, since it is shown that the TACOM measure seem to properly quantify the complexity of emergency tasks, it is desirable that the TACOM measure plays an important role in improving the performance of human operators

  9. The development of a quantitative measure for the complexity of emergency tasks stipulated in emergency operating procedures of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jin Kyun; Jung, Won Dea

    2006-11-15

    Previous studies have continuously pointed out that human performance is a decisive factor affecting the safety of complicated process systems. Subsequently, as the result of extensive efforts, it has been revealed that the provision of procedures is one of the most effective countermeasures, especially if human operators have to carry out their tasks under a very stressful environment. That is, since good procedures are helpful to not only enhance the performance of human operators but also the reduction of the possibility of a human error through stipulating detailed tasks to be done by human operators. Ironically, it has been emphasized that the performance of human operators could be impaired due to complicated procedures, because procedures directly govern the physical as well as cognitive behavior of human operators by institutionalizing detailed actions. Therefore, it is a prerequisite to develop a systematic framework that properly evaluate the complexity of tasks described in procedures. For this reason, a measure called TACOM (Task Complexity) that can quantify the complexity of emergency tasks described in the emergency operating procedures (EOPs) of NPPs has been developed. In this report, a technical background as well as practical steps to quantify the complexity of tasks were presented with a series of studies that were conducted to ensure the validity of the TACOM measure. As a result of validation studies, since it is shown that the TACOM measure seem to properly quantify the complexity of emergency tasks, it is desirable that the TACOM measure plays an important role in improving the performance of human operators.

  10. Can children undergoing ophthalmologic examinations under anesthesia be safely anesthetized without using an IV line?

    Directory of Open Access Journals (Sweden)

    Vigoda M

    2011-04-01

    Full Text Available Michael M Vigoda, Azeema Latiff, Timothy G Murray, Jacqueline L Tutiven, Audina M Berrocal, Steven GayerBascom Palmer Eye Institute, University of Miami Miller School of Medicine, Miami, FL, USAPurpose: To document that with proper patient and procedure selection, children undergoing general inhalational anesthesia for ophthalmologic exams (with or without photos, ultrasound, laser treatment, peri-ocular injection of chemotherapy, suture removal, and/or replacement of ocular prosthesis can be safely anesthetized without the use of an intravenous (IV line. Children are rarely anesthetized without IV access placement. We performed a retrospective study to determine our incidence of IV access placement during examinations under anesthesia (EUA and the incidence of adverse events that required intraoperative IV access placement.Methods: Data collected from our operating room (OR information system includes but is not limited to diagnosis, anesthesiologist, surgeon, and location of IV catheter (if applicable, patient’s date of birth, actual procedure, and anesthesia/procedure times. We reviewed the OR and anesthetic records of children (>1 month and <10 years who underwent EUAs between January 1, 2003 and May 31, 2009. We determined the percentage of children who were anesthetized without IV access placement, as well as the incidence of any adverse events that required IV access placement, intraoperatively.Results: We analyzed data from 3196 procedures performed during a 77-month period. Patients’ ages ranged from 1 month to 9 years. Overall, 92% of procedures were performed without IV access placement. Procedure duration ranged from 1–39 minutes. Reasons for IV access placement included parental preference for antinausea medication and/or attending preference for IV access placement. No child who underwent anesthesia without an IV line had an intraoperative adverse event requiring insertion of an IV line.Conclusion: Our data suggest that for

  11. Frey procedure for chronic pancreatitis in children: A single center experience.

    Science.gov (United States)

    Ray, Sukanta; Sanyal, Sumit; Ghatak, Supriyo; Khamrui, Sujan; Biswas, Jayanta; Saha, Suman; Mandal, Tuhin Subhra; Chattopadhyay, Gautam

    2015-11-01

    There is paucity of literature regarding the Frey procedure for children with chronic pancreatitis. The purpose of this study is to present our experience with the Frey procedure in children. This is an observational retrospective review study. All children, who underwent a Frey procedure between August 2007 and May 2014 in the Department of Surgical Gastroenterology, Institute of Postgraduate Medical Education and Research, Kolkata, India were included in this study. Twenty four children were included in our study. There were 13 girls and 11 boys. Mean age at operation was 13.95years (range, 4 to 18years). Mean duration between the diagnosis of chronic pancreatitis and surgery was 4.41years (range, 1 to 14years). Frey procedure was performed after failure of medical or endoscopic therapy. Mean duration of operation and blood loss were 215minutes (range, 150-300minutes) and 177ml (range, 50 to 500ml) respectively. Average postoperative hospital stay was 8days (range, 5 to 16days). Five patients (21%) developed postoperative complications. There was no in hospital mortality and no patient required reoperation for postoperative complications. More than a median follow-up of 29months (range, 3-78months), 91% of the patients remained pain free. Frey procedure is safe and feasible in children with acceptable perioperative complications and good short-term pain control. Copyright © 2015 Elsevier Inc. All rights reserved.

  12. Simultaneous bilateral stereotactic procedure for deep brain stimulation implants: a significant step for reducing operation time.

    Science.gov (United States)

    Fonoff, Erich Talamoni; Azevedo, Angelo; Angelos, Jairo Silva Dos; Martinez, Raquel Chacon Ruiz; Navarro, Jessie; Reis, Paul Rodrigo; Sepulveda, Miguel Ernesto San Martin; Cury, Rubens Gisbert; Ghilardi, Maria Gabriela Dos Santos; Teixeira, Manoel Jacobsen; Lopez, William Omar Contreras

    2016-07-01

    OBJECT Currently, bilateral procedures involve 2 sequential implants in each of the hemispheres. The present report demonstrates the feasibility of simultaneous bilateral procedures during the implantation of deep brain stimulation (DBS) leads. METHODS Fifty-seven patients with movement disorders underwent bilateral DBS implantation in the same study period. The authors compared the time required for the surgical implantation of deep brain electrodes in 2 randomly assigned groups. One group of 28 patients underwent traditional sequential electrode implantation, and the other 29 patients underwent simultaneous bilateral implantation. Clinical outcomes of the patients with Parkinson's disease (PD) who had undergone DBS implantation of the subthalamic nucleus using either of the 2 techniques were compared. RESULTS Overall, a reduction of 38.51% in total operating time for the simultaneous bilateral group (136.4 ± 20.93 minutes) as compared with that for the traditional consecutive approach (220.3 ± 27.58 minutes) was observed. Regarding clinical outcomes in the PD patients who underwent subthalamic nucleus DBS implantation, comparing the preoperative off-medication condition with the off-medication/on-stimulation condition 1 year after the surgery in both procedure groups, there was a mean 47.8% ± 9.5% improvement in the Unified Parkinson's Disease Rating Scale Part III (UPDRS-III) score in the simultaneous group, while the sequential group experienced 47.5% ± 15.8% improvement (p = 0.96). Moreover, a marked reduction in the levodopa-equivalent dose from preoperatively to postoperatively was similar in these 2 groups. The simultaneous bilateral procedure presented major advantages over the traditional sequential approach, with a shorter total operating time. CONCLUSIONS A simultaneous stereotactic approach significantly reduces the operation time in bilateral DBS procedures, resulting in decreased microrecording time, contributing to the optimization of functional

  13. A safe, effective, and facility compatible cleaning in place procedure for affinity resin in large-scale monoclonal antibody purification.

    Science.gov (United States)

    Wang, Lu; Dembecki, Jill; Jaffe, Neil E; O'Mara, Brian W; Cai, Hui; Sparks, Colleen N; Zhang, Jian; Laino, Sarah G; Russell, Reb J; Wang, Michelle

    2013-09-20

    Cleaning-in-place (CIP) for column chromatography plays an important role in therapeutic protein production. A robust and efficient CIP procedure ensures product quality, improves column life time and reduces the cost of the purification processes, particularly for those using expensive affinity resins, such as MabSelect protein A resin. Cleaning efficiency, resin compatibility, and facility compatibility are the three major aspects to consider in CIP process design. Cleaning MabSelect resin with 50mM sodium hydroxide (NaOH) along with 1M sodium chloride is one of the most popular cleaning procedures used in biopharmaceutical industries. However, high concentration sodium chloride is a leading cause of corrosion in the stainless steel containers used in large scale manufacture. Corroded containers may potentially introduce metal contaminants into purified drug products. Therefore, it is challenging to apply this cleaning procedure into commercial manufacturing due to facility compatibility and drug safety concerns. This paper reports a safe, effective and environmental and facility-friendly cleaning procedure that is suitable for large scale affinity chromatography. An alternative salt (sodium sulfate) is used to prevent the stainless steel corrosion caused by sodium chloride. Sodium hydroxide and salt concentrations were optimized using a high throughput screening approach to achieve the best combination of facility compatibility, cleaning efficiency and resin stability. Additionally, benzyl alcohol is applied to achieve more effective microbial control. Based on the findings, the recommended optimum cleaning strategy is cleaning MabSelect resin with 25 mM NaOH, 0.25 M Na2SO4 and 1% benzyl alcohol solution every cycle, followed by a more stringent cleaning using 50 mM NaOH with 0.25 M Na2SO4 and 1% benzyl alcohol at the end of each manufacturing campaign. A resin life cycle study using the MabSelect affinity resin demonstrates that the new cleaning strategy

  14. Safe specification of operator precedence rules

    NARCIS (Netherlands)

    Afroozeh, A.; Brand, van den M.G.J.; Johnstone, A.; Scott, E.; Vinju, J.J.; Erwig, M.; Paige, R.F.; Van Wyk, E.

    2013-01-01

    In this paper we present an approach to specifying operator precedence based on declarative disambiguation constructs and an implementation mechanism based on grammar rewriting. We identify a problem with existing generalized context-free parsing and disambiguation technology: generating a correct

  15. Iterative co-creation for improved hand hygiene and aseptic techniques in the operating room: experiences from the safe hands study.

    Science.gov (United States)

    Erichsen Andersson, Annette; Frödin, Maria; Dellenborg, Lisen; Wallin, Lars; Hök, Jesper; Gillespie, Brigid M; Wikström, Ewa

    2018-01-04

    Hand hygiene and aseptic techniques are essential preventives in combating hospital-acquired infections. However, implementation of these strategies in the operating room remains suboptimal. There is a paucity of intervention studies providing detailed information on effective methods for change. This study aimed to evaluate the process of implementing a theory-driven knowledge translation program for improved use of hand hygiene and aseptic techniques in the operating room. The study was set in an operating department of a university hospital. The intervention was underpinned by theories on organizational learning, culture and person centeredness. Qualitative process data were collected via participant observations and analyzed using a thematic approach. Doubts that hand-hygiene practices are effective in preventing hospital acquired infections, strong boundaries and distrust between professional groups and a lack of psychological safety were identified as barriers towards change. Facilitated interprofessional dialogue and learning in "safe spaces" worked as mechanisms for motivation and engagement. Allowing for the free expression of different opinions, doubts and viewing resistance as a natural part of any change was effective in engaging all professional categories in co-creation of clinical relevant solutions to improve hand hygiene. Enabling nurses and physicians to think and talk differently about hospital acquired infections and hand hygiene requires a shift from the concept of one-way directed compliance towards change and learning as the result of a participatory and meaning-making process. The present study is a part of the Safe Hands project, and is registered with ClinicalTrials.gov (ID: NCT02983136 ). Date of registration 2016/11/28, retrospectively registered.

  16. Computerized procedures system

    Science.gov (United States)

    Lipner, Melvin H.; Mundy, Roger A.; Franusich, Michael D.

    2010-10-12

    An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

  17. Safe transport of radioactive material. 3. ed

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-12-01

    The IAEA has developed a standardized approach to transport safety training as a means of helping Member States to implement the Transport Regulations. The training manual is an anchor of this standardized approach to training: it contains all the topics presented in the sequential order recommended by the IAEA for the student to gain a thorough understanding of the body of knowledge that is needed to ensure that radioactive material ranked as Class 7 in the United Nations' nomenclature for dangerous goods - is transported safely. The explanations in the text refer, where needed, to the appropriate requirements in the IAEA's Transport Regulations; additional useful information is also provided. Thus, the training manual in addition to the Transport Regulations and their supporting documents is used by the IAEA as the basis for delivering all of its training courses on the safe transport of radioactive material. Enclosed with the training manual is a CD-ROM that contains the text of the manual as well as the visual aids that are used at the IAEA's training courses. The following topics are covered: review of radioactivity and radiation; review of radiation protection principles; regulatory terminology; basic safety concepts: materials and packages; activity limits and material restrictions; selection of optimal package type; test procedures: material and packages; requirements for transport; control of material in transport; fissile material: regulatory requirements and operational aspects; quality assurance; national competent authority; additional regulatory constraints for transport; international liability and insurance; emergency planning and preparedness; training; services provided by the IAEA.

  18. Safe transport of radioactive material. 3. ed

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA has developed a standardized approach to transport safety training as a means of helping Member States to implement the Transport Regulations. The training manual is an anchor of this standardized approach to training: it contains all the topics presented in the sequential order recommended by the IAEA for the student to gain a thorough understanding of the body of knowledge that is needed to ensure that radioactive material ranked as Class 7 in the United Nations' nomenclature for dangerous goods - is transported safely. The explanations in the text refer, where needed, to the appropriate requirements in the IAEA's Transport Regulations; additional useful information is also provided. Thus, the training manual in addition to the Transport Regulations and their supporting documents is used by the IAEA as the basis for delivering all of its training courses on the safe transport of radioactive material. Enclosed with the training manual is a CD-ROM that contains the text of the manual as well as the visual aids that are used at the IAEA's training courses. The following topics are covered: review of radioactivity and radiation; review of radiation protection principles; regulatory terminology; basic safety concepts: materials and packages; activity limits and material restrictions; selection of optimal package type; test procedures: material and packages; requirements for transport; control of material in transport; fissile material: regulatory requirements and operational aspects; quality assurance; national competent authority; additional regulatory constraints for transport; international liability and insurance; emergency planning and preparedness; training; services provided by the IAEA

  19. Planetary Boundaries: Exploring the Safe Operating Space for Humanity

    DEFF Research Database (Denmark)

    Richardson, Katherine; Rockström, Johan; Steffen, Will

    2009-01-01

    boundaries are rough, first estimates only, surrounded by large uncertainties and knowledge gaps. Filling these gaps will require major advancements in Earth System and resilience science. The proposed concept of "planetary boundaries" lays the groundwork for shifting our approach to governance...... and management, away from the essentially sectoral analyses of limits to growth aimed at minimizing negative externalities, toward the estimation of the safe space for human development. Planetary boundaries define, as it were, the boundaries of the "planetary playing field" for humanity if we want to be sure...

  20. Virtual reality in simulation of operational procedures in radioactive waste deposits

    International Nuclear Information System (INIS)

    Freitas, Victor Goncalves Gloria

    2016-01-01

    One of the biggest problems in the nuclear area are still the radioactive waste generated in the various applications of this form of energy, all these tailings are stored in warehouses that often are monitored and restructured for better allocation of then. These tailings are stored until it is safe to release into the environment. This work presents a methodology based on virtual reality, for the development of virtual deposits of radioactive waste in order to enable virtual simulations in these deposits. As application will be developed virtually the nuclear waste repository located at the Institute of Nuclear Engineering IEN/CNEN. The development of a virtual warehouse, more specifically, makes it possible to simulate/train the allocation and reallocation of materials with low and medium level of radioactivity, seen the possibility of locomotion of virtual objects and dynamic calculation of the rate of radiation in this environment. Using this methodology it also possible know the accumulated dose, by the virtual character, during the procedures run in the virtual environment. (author)

  1. Beam interlock system and safe machine parameters system 2010 and beyond

    CERN Document Server

    Todd, B

    2010-01-01

    The Beam Interlock System (BIS) and Safe Machine Parameters (SMP) system are central to the protection of the Large Hadron Collider (LHC) machine. The BIS has been critical for the safe operation of LHC from the first day of operation. It has been installed and commissioned, only minor enhancements are required in order to accommodate all future LHC machine protection requirements. At reduced intensity, the SMP system is less critical for LHC operation. As such, the current system satisfies the 2010 operational requirements. Further developments are required, both at the SMP Controller level, and at the system level, in order to accommodate the requirements of the LHC beyond 2010.

  2. 40 CFR Appendix K to Part 75 - Quality Assurance and Operating Procedures for Sorbent Trap Monitoring Systems

    Science.gov (United States)

    2010-07-01

    ... Pump. Use a leak-tight, vacuum pump capable of operating within the candidate system's flow range. 5.1... sorbent trap monitoring system typically operates. The gas flow meter shall be equipped with any necessary... system typically operates. You may either follow the procedures in section 10.3.1 of Method 5 in appendix...

  3. Fail-safe logic elements for use with reactor safety systems

    International Nuclear Information System (INIS)

    Bobis, J.P.; McDowell, W.P.

    1976-01-01

    A complete fail-safe trip circuit is described which utilizes fail-safe logic elements. The logic elements used are analog multipliers and active bandpass filter networks. These elements perform Boolean operations on a set of AC signals from the output of a reactor safety-channel trip comparator

  4. Classifier-ensemble incremental-learning procedure for nuclear transient identification at different operational conditions

    Energy Technology Data Exchange (ETDEWEB)

    Baraldi, Piero, E-mail: piero.baraldi@polimi.i [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Razavi-Far, Roozbeh [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Zio, Enrico [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Ecole Centrale Paris-Supelec, Paris (France)

    2011-04-15

    An important requirement for the practical implementation of empirical diagnostic systems is the capability of classifying transients in all plant operational conditions. The present paper proposes an approach based on an ensemble of classifiers for incrementally learning transients under different operational conditions. New classifiers are added to the ensemble where transients occurring in new operational conditions are not satisfactorily classified. The construction of the ensemble is made by bagging; the base classifier is a supervised Fuzzy C Means (FCM) classifier whose outcomes are combined by majority voting. The incremental learning procedure is applied to the identification of simulated transients in the feedwater system of a Boiling Water Reactor (BWR) under different reactor power levels.

  5. Classifier-ensemble incremental-learning procedure for nuclear transient identification at different operational conditions

    International Nuclear Information System (INIS)

    Baraldi, Piero; Razavi-Far, Roozbeh; Zio, Enrico

    2011-01-01

    An important requirement for the practical implementation of empirical diagnostic systems is the capability of classifying transients in all plant operational conditions. The present paper proposes an approach based on an ensemble of classifiers for incrementally learning transients under different operational conditions. New classifiers are added to the ensemble where transients occurring in new operational conditions are not satisfactorily classified. The construction of the ensemble is made by bagging; the base classifier is a supervised Fuzzy C Means (FCM) classifier whose outcomes are combined by majority voting. The incremental learning procedure is applied to the identification of simulated transients in the feedwater system of a Boiling Water Reactor (BWR) under different reactor power levels.

  6. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  7. The Safe Transportation of Radioactive Materials

    International Nuclear Information System (INIS)

    Megrahi, Abdulhafeed; Abu-Ali, Giuma; Enhaba; Ahmed

    2008-01-01

    In this paper, we present the essential conditions that should be required for transporting the radioactive materials. We demonstrate the procedure for transporting the radioactive iodine-131 from the Centre of Renewable Energies and Desalination of Water in Tajoura, Libya to Tripoli Medical Center. The safe measures were taken during the process of the transportation of the isotope produced in the centre including dosimetry analysis and the thickness of the container. (author)

  8. 78 FR 57319 - Children's Online Privacy Protection Rule Safe Harbor Proposed Self-Regulatory Guidelines...

    Science.gov (United States)

    2013-09-18

    ...-AB20 Children's Online Privacy Protection Rule Safe Harbor Proposed Self-Regulatory Guidelines; kidSAFE... proposed self-regulatory guidelines submitted by the kidSAFE Seal Program (``kidSAFE''), owned and operated... enabling industry groups or others to submit to the Commission for approval self-regulatory guidelines that...

  9. NRC/FEMA operational response procedures for response to a commercial nuclear reactor accident. Revision 1

    International Nuclear Information System (INIS)

    1985-02-01

    Procedures have been developed by the US Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) which provide the response teams of both agencies with the steps to be taken in responding to an emergency at a commercial nuclear power plant. The emphasis of these procedures is mainly on the interface between NRC and FEMA at their respective Headquarters and Regional Offices and at the various sites at which such an emergency could occur. Detailed procedures are presented that cover for both agencies, notification schemes and manner of activation, organizations at Headquarters and the site, interface procedures, coordination of onsite and offsite operations, the role of the Senior FEMA Official, and the cooperative efforts of each agency's public information staff

  10. Digital computer operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Colley, R.W.

    1984-01-01

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state

  11. Functional Requirements Document for HALE UAS Operations in the NAS: Step 1. Version 3

    Science.gov (United States)

    2006-01-01

    The purpose of this Functional Requirements Document (FRD) is to compile the functional requirements needed to achieve the Access 5 Vision of "operating High Altitude, Long Endurance (HALE) Unmanned Aircraft Systems (UAS) routinely, safely, and reliably in the national airspace system (NAS)" for Step 1. These functional requirements could support the development of a minimum set of policies, procedures and standards by the Federal Aviation Administration (FAA) and various standards organizations. It is envisioned that this comprehensive body of work will enable the FAA to establish and approve regulations to govern safe operation of UAS in the NAS on a routine or daily "file and fly" basis. The approach used to derive the functional requirements found within this FRD was to decompose the operational requirements and objectives identified within the Access 5 Concept of Operations (CONOPS) into the functions needed to routinely and safely operate a HALE UAS in the NAS. As a result, four major functional areas evolved to enable routine and safe UAS operations for an on-demand basis in the NAS. These four major functions are: Aviate, Navigate, Communicate, and Avoid Hazards. All of the functional requirements within this document can be directly traceable to one of these four major functions. Some functions, however, are traceable to several, or even all, of these four major functions. These cross-cutting functional requirements support the "Command / Control: function as well as the "Manage Contingencies" function. The requirements associated to these high-level functions and all of their supporting low-level functions are addressed in subsequent sections of this document.

  12. Mentored retroperitoneal laparoscopic renal surgery in children: a safe approach to learning.

    Science.gov (United States)

    Farhat, W; Khoury, A; Bagli, D; McLorie, G; El-Ghoneimi, A

    2003-10-01

    To review the feasibility of introducing advanced retroperitoneal renal laparoscopic surgery (RRLS) to a paediatric urology division, using the mentorship-training model. Although the scope of practice in paediatric urology is currently adapting endoscopic surgery into daily practice, most paediatric urologists in North America have had no formal training in laparoscopic surgery. The study included four paediatric urologists with 3-25 years of practice; none had had any formal laparoscopic training or ever undertaken advanced RRLS. An experienced laparoscopic surgeon (the mentor) assisted the learning surgeons over a year. The initial phases of learning incorporated detailed lectures, visualization through videotapes and 'hands-on' demonstration by the expert in the technique of the standardized steps for each type of surgery. Over 10 months, ablative and reconstructive RRLS was undertaken jointly by the surgeons and the mentor. After this training the surgeons operated independently. To prevent lengthy operations, conversion to open surgery was planned if there was no significant progression after 2 h of laparoscopic surgery. Over the 10 months of mentorship, 36 RRLS procedures were undertaken in 31 patients (28 ablative and eight reconstructive). In all cases the mentored surgeons accomplished both retroperitoneal access and the creation of a working space within the cavity. The group was able to initiate ablative RRLS but the mentor undertook all the reconstructive procedures. After the mentorship period, over 10 months, 12 ablative procedures were undertaken independently, and five other attempts at RRLS failed. Although the mentored approach can successfully and safely initiate advanced RRLS in a paediatric urology division, assessing the laparoscopic practice pattern after mentorship in the same group of trainees is warranted. Ablative RRLS is easier to learn for the experienced surgeon, but reconstructive procedures, e.g. pyeloplasty, require a high degree

  13. Soil Gas Sampling Operating Procedure

    Science.gov (United States)

    EPA Region 4 Science and Ecosystem Support Division (SESD) document that describes general and specific procedures, methods, and considerations when collecting soil gas samples for field screening or laboratory analysis.

  14. Surgical treatment of chronic pancreatitis using Frey's procedure: a Brazilian 16-year single-centre experience.

    Science.gov (United States)

    Gestic, Martinho Antonio; Callejas-Neto, Francisco; Chaim, Elinton Adami; Utrini, Murillo Pimentel; Cazzo, Everton; Pareja, Jose Carlos

    2011-04-01

    Surgical treatment of chronic pancreatitis is indicated for intractable pain. Frey's procedure is an accepted treatment for this disease. The aim of the present study was to describe a single-centre experience in the treatment of chronic pancreatitis using Frey's procedure. A retrospective analysis of 73 patients who underwent a Frey's procedure between 1991 to 2007 and had at least 1 year of follow-up. Demographics, indication for surgery, peri-operative complications and late outcomes were analysed. The median age was 39.9 years. Seventy out of the 73 (95.8%) patients were male. The median pre-operative body mass index (BMI) was 19.1 kg/m(2). All patients had abdominal pain, 34 (46.6%) of them daily and 13 (17.8%) weekly, with moderate or severe intensity in 98.6% (n= 72). The aetiology was secondary to alcohol in 70 patients (95.9%), with a median consumption of 278 g per day. The surgical morbidity rate was 28.7%; there were no deaths. Median post-operative follow-up was 77.0 months; 64 patients (91.4%) had complete pain relief and post-operative BMI was 22.4 kg/m(2) (P<0.001). All patients with pre-operative endocrine and exocrine insufficiencies showed no reversal of the situation. New onset insufficiencies appeared late. Frey's procedure was a safe and effective therapeutic option for the surgical treatment of patients with intractable pain caused by chronic pancreatitis. © 2011 International Hepato-Pancreato-Biliary Association.

  15. SafeNet: a methodology for integrating general-purpose unsafe devices in safe-robot rehabilitation systems.

    Science.gov (United States)

    Vicentini, Federico; Pedrocchi, Nicola; Malosio, Matteo; Molinari Tosatti, Lorenzo

    2014-09-01

    Robot-assisted neurorehabilitation often involves networked systems of sensors ("sensory rooms") and powerful devices in physical interaction with weak users. Safety is unquestionably a primary concern. Some lightweight robot platforms and devices designed on purpose include safety properties using redundant sensors or intrinsic safety design (e.g. compliance and backdrivability, limited exchange of energy). Nonetheless, the entire "sensory room" shall be required to be fail-safe and safely monitored as a system at large. Yet, sensor capabilities and control algorithms used in functional therapies require, in general, frequent updates or re-configurations, making a safety-grade release of such devices hardly sustainable in cost-effectiveness and development time. As such, promising integrated platforms for human-in-the-loop therapies could not find clinical application and manufacturing support because of lacking in the maintenance of global fail-safe properties. Under the general context of cross-machinery safety standards, the paper presents a methodology called SafeNet for helping in extending the safety rate of Human Robot Interaction (HRI) systems using unsafe components, including sensors and controllers. SafeNet considers, in fact, the robotic system as a device at large and applies the principles of functional safety (as in ISO 13489-1) through a set of architectural procedures and implementation rules. The enabled capability of monitoring a network of unsafe devices through redundant computational nodes, allows the usage of any custom sensors and algorithms, usually planned and assembled at therapy planning-time rather than at platform design-time. A case study is presented with an actual implementation of the proposed methodology. A specific architectural solution is applied to an example of robot-assisted upper-limb rehabilitation with online motion tracking. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  16. A procedure for the analysis of errors of commission in a Probabilistic Safety Assessment of a nuclear power plant at full power

    International Nuclear Information System (INIS)

    Julius, J.; Jorgenson, E.; Parry, G.W.; Mosleh, A.M.

    1995-01-01

    This paper describes an analytical procedure that has been developed to facilitate the identification of errors of commission for inclusion in a Probabilistic Safety Assessment (PSA) of a nuclear power plant operating at full power. The procedure first identifies the opportunities for error by determining when operators are required to intervene to bring the plant to a safe condition following a transient, and then identifying under what conditions this is likely to occur using a model of the causes of error. In order to make the analysis practicable, a successive screening approach is used to identify those errors with the highest potential of occurrence. The procedure has been applied as part of a PSA study, and the results of that application are summarized. For the particular plant to which the procedure was applied, the conclusion was that, because of the nature of the procedures, the high degree of redundancy in the instrumentation, the operating practices, and the control board layouts, the potential for significant errors of commission is low

  17. UAV Research at NASA Langley: Towards Safe, Reliable, and Autonomous Operations

    Science.gov (United States)

    Davila, Carlos G.

    2016-01-01

    Unmanned Aerial Vehicles (UAV) are fundamental components in several aspects of research at NASA Langley, such as flight dynamics, mission-driven airframe design, airspace integration demonstrations, atmospheric science projects, and more. In particular, NASA Langley Research Center (Langley) is using UAVs to develop and demonstrate innovative capabilities that meet the autonomy and robotics challenges that are anticipated in science, space exploration, and aeronautics. These capabilities will enable new NASA missions such as asteroid rendezvous and retrieval (ARRM), Mars exploration, in-situ resource utilization (ISRU), pollution measurements in historically inaccessible areas, and the integration of UAVs into our everyday lives all missions of increasing complexity, distance, pace, and/or accessibility. Building on decades of NASA experience and success in the design, fabrication, and integration of robust and reliable automated systems for space and aeronautics, Langley Autonomy Incubator seeks to bridge the gap between automation and autonomy by enabling safe autonomous operations via onboard sensing and perception systems in both data-rich and data-deprived environments. The Autonomy Incubator is focused on the challenge of mobility and manipulation in dynamic and unstructured environments by integrating technologies such as computer vision, visual odometry, real-time mapping, path planning, object detection and avoidance, object classification, adaptive control, sensor fusion, machine learning, and natural human-machine teaming. These technologies are implemented in an architectural framework developed in-house for easy integration and interoperability of cutting-edge hardware and software.

  18. The use of operator surveys by the CEGB to evaluate nuclear control room design and initiatives in the design of alarm systems and control room operating procedures

    International Nuclear Information System (INIS)

    Jackson, A.R.G.

    1988-01-01

    This paper reports on the use of operator surveys and trip report analysis methods which the Central Electricity Generating Board has developed to assess the extent and adequacy of operator support systems currently installed on its four twin-reactor, first generation Advanced Gas Cooled Reactor nuclear power plants. The survey consisted of a programme of structured interviews with control room engineers. The scope of the questions addressed; working environment, communications, man-machine interface, procedural information, and the diagnostic and predictive support system. The analysis of trip reports was targetted at identifying aspects of the performance of the operator support systems which might have been contributory to the cause of reactor trip. The results of this work are being used to assist in determining guidelines for the development of operator support systems, computerised controls and the structure of station operating procedures

  19. Manpower development for safe operation of nuclear power plant. China. Main steam bypass system operation and maintenance. Task: 6.1.6. Technical report

    International Nuclear Information System (INIS)

    Stubley, P.H.

    1994-01-01

    This mission concentrated on the Steam Bypass system of Qinshan Nuclear Power Plant. The system had experienced spurious opening of the bypass valves, disrupting the steam pressure control and the steam generator level control system. A series of commissioning type tests were defined which should allow the operators to revise the setpoints used in the control of the bypass system, and thus prevent spurious opening while maintaining the desired steam pressure control during power maneuvering. Training also included giving experience from other operating plants on aspects of steam and feedwater systems and components, especially as this experience affected maintenance or gave rise to problems. Steam generated maintenance experience is especially applicable, and a future mission is planned for an expert in this field. In addition other aspects of the Chinese nuclear program was assessed to guide future missions. This included assessment of operating procedures from an availability point of view

  20. Load of Co-60 in large gamma irradiators: a safe proceeding; Carregamento de Co-60 em irradiadores de grande porte: um procedimento seguro

    Energy Technology Data Exchange (ETDEWEB)

    Luca, Gilmara C.; Paquer, Daniela, E-mail: gilmara@cbesa.com.b, E-mail: daniela@cbesa.com.b [CBE Embrarad, Jarinu, SP (Brazil)

    2011-10-26

    The inclusion of new Co-60 sources in industrial irradiators is an extra procedure to its operation and extremely critical. The operation requires planning, attention, responsibility and a well trained staff. Radiation level, package contamination and radioactive material escape evaluations are essential as measurement of pre-loading safety. The package transfer for the swimming pool i e the most critical moment of the operation. After sources transfer to the racks, it is necessary the monitoring of tools, package and sources through the scrubbing test. Notwithstanding to be a critical operation, the risk is minimized when it is performed according to safe rules and radiation protection, and in the process performed the individual accumulated doses does not exceed 50 to {mu}Sv