WorldWideScience

Sample records for RAM investigation Coal-fired Thermal Power Plant Critical Subsystem Preventive Maintenance Interval Decreasing Failure Rate Increasing Failure Rate

  1. RAM investigation of coal-fired thermal power plants: A case study

    Directory of Open Access Journals (Sweden)

    D. Bose

    2012-04-01

    Full Text Available Continuous generation of electricity of a power plant depends on the higher availability of its components/equipments. Higher availability of the components/equipments is inherently associated with their higher reliability and maintainability. This paper investigates the reliability, availability and maintainability (RAM characteristics of a 210 MW coal-fired thermal power plant (Unit-2 from a thermal power station in eastern region of India. Critical mechanical subsystems with respect to failure frequency, reliability and maintainability are identified for taking necessary measures for enhancing availability of the power plant and the results are compared with Unit-1 of the same Power Station. Reliability-based preventive maintenance intervals (PMIs at various reliability levels of the subsystems are estimated also for performing their preventive maintenance (PM. The present paper highlights that in the Unit-2, Economizer (ECO & Furnace Wall Tube (FWT exhibits lower reliability as compared to the other subsystems and Economizer (ECO & Baffle Wall Tube (BWT demands more improvement in maintainability. Further, it has been observed that FSH followed Decreasing Failure Rate (DFR and Economizer (ECO is the most critical subsystem for both the plants. RAM analysis is very much effective in finding critical subsystems and deciding their preventive maintenance program for improving availability of the power plant as well as the power supply.

  2. Failure mode, effect and criticality analysis (FMECA) on mechanical subsystems of diesel generator at NPP

    International Nuclear Information System (INIS)

    Kim, Tae Woon; Singh, Brijendra; Sung, Tae Yong; Park, Jin Hee; Lee, Yoon Hwan

    1996-06-01

    Largely, the RCM approach can be divided in three phases; (1) Functional failure analysis (FFA) on the selected system or subsystem, (2) Failure mode, effect and criticality analysis (FMECA) to identify the impact of failure to plant safety or economics, (3) Logical tree analysis (LTA) to select appropriate preventive maintenance and surveillance tasks. This report presents FMECA results for six mechanical subsystems of the diesel generators of nuclear power plants. The six mechanical subsystems are Starting air, Lub oil, Governor, Jacket water cooling, Fuel, and Engine subsystems. Generic and plant-specific failure and maintenance records are reviewed to identify critical components/failure modes. FMECA was performed for these critical component/failure modes. After reviewing current preventive maintenance activities of Wolsung unit 1, draft RCM recommendations are developed. 6 tabs., 16 refs. (Author)

  3. Failure mode, effect and criticality analysis (FMECA) on mechanical subsystems of diesel generator at NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Woon; Singh, Brijendra; Sung, Tae Yong; Park, Jin Hee; Lee, Yoon Hwan [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-06-01

    Largely, the RCM approach can be divided in three phases; (1) Functional failure analysis (FFA) on the selected system or subsystem, (2) Failure mode, effect and criticality analysis (FMECA) to identify the impact of failure to plant safety or economics, (3) Logical tree analysis (LTA) to select appropriate preventive maintenance and surveillance tasks. This report presents FMECA results for six mechanical subsystems of the diesel generators of nuclear power plants. The six mechanical subsystems are Starting air, Lub oil, Governor, Jacket water cooling, Fuel, and Engine subsystems. Generic and plant-specific failure and maintenance records are reviewed to identify critical components/failure modes. FMECA was performed for these critical component/failure modes. After reviewing current preventive maintenance activities of Wolsung unit 1, draft RCM recommendations are developed. 6 tabs., 16 refs. (Author).

  4. Coal-Fired Power Plant Heat Rate Reductions

    Science.gov (United States)

    View a report that identifies systems and equipment in coal-fired power plants where efficiency improvements can be realized, and provides estimates of the resulting net plant heat rate reductions and costs for implementation.

  5. Failure Rate Prediction of Active Component Using PM Basis Database

    International Nuclear Information System (INIS)

    Kim, J. S.; Kim, H. W.; Park, J. S.; Jung, S. G.

    2011-01-01

    The safety security and efficient management of NPPs (Nuclear Power Plants) have been increased after the accident of TEPCO's Fukushima nuclear power stations. The needs for the safety and efficiency are becoming more important because about 90 percent of the NPPs all over the world are more than 20 operation years old. The preventive maintenance criteria need to be flexible, considering long-term development of the equipment performance and preventive maintenance. The PMBD (Preventive Maintenance Basis Database) program was widely used for optimization of the preventive maintenance criteria. PMBD program contains all kinds of failure mechanisms for each equipment that may occur in the power plant based on RCM(Reliability-Centered Maintenance) and numerically calculate the variation of reliability and failure rate based on PM interval changes. In this study, propriety evaluation of preventive maintenance task, cycle, technical basis for cost effective preventive maintenance strategy and an appropriate evaluation were suggested by the case application of PMBD for major components in the NPPs

  6. Failure investigation of super heater tubes of coal fired power plant

    Directory of Open Access Journals (Sweden)

    A.K. Pramanick

    2017-10-01

    Full Text Available Cause of failure of two adjacent super heater tubes made of Cr-Mo steel of a coal based 60 MW thermal power plant has been portrayed in present investigation. Oxide deposits were found on internal surface of tubes. Deposits created significant resistance to heat transfer and resulted in undesirable rise in component temperature. This situation, in turn, aggravated the condition of gas side that was exposed to high temperature. Localized heating coarsened carbides as well as propelled precipitation of new brittle phases along grain boundary resulting in embrittlement of tube material. Continuous exposure to high temperature softened the tube material and tube wall was thinned down with bulging toward outside. Creep void formation along grain boundary was observed and steered intergranular cracking. All these effects contributed synergistically and tubes were failed ultimately due to overload under high Hoop stress.

  7. Availability Performance Analysis of Thermal Power Plants

    Science.gov (United States)

    Bhangu, Navneet Singh; Singh, Rupinder; Pahuja, G. L.

    2018-03-01

    This case study presents the availability evaluation method of thermal power plants for conducting performance analysis in Indian environment. A generic availability model has been proposed for a maintained system (thermal plants) using reliability block diagrams and fault tree analysis. The availability indices have been evaluated under realistic working environment using inclusion exclusion principle. Four year failure database has been used to compute availability for different combinatory of plant capacity, that is, full working state, reduced capacity or failure state. Availability is found to be very less even at full rated capacity (440 MW) which is not acceptable especially in prevailing energy scenario. One of the probable reason for this may be the difference in the age/health of existing thermal power plants which requires special attention of each unit from case to case basis. The maintenance techniques being used are conventional (50 years old) and improper in context of the modern equipment, which further aggravate the problem of low availability. This study highlights procedure for finding critical plants/units/subsystems and helps in deciding preventive maintenance program.

  8. Statistical analysis of nuclear power plant pump failure rate variability: some preliminary results

    International Nuclear Information System (INIS)

    Martz, H.F.; Whiteman, D.E.

    1984-02-01

    In-Plant Reliability Data System (IPRDS) pump failure data on over 60 selected pumps in four nuclear power plants are statistically analyzed using the Failure Rate Analysis Code (FRAC). A major purpose of the analysis is to determine which environmental, system, and operating factors adequately explain the variability in the failure data. Catastrophic, degraded, and incipient failure severity categories are considered for both demand-related and time-dependent failures. For catastrophic demand-related pump failures, the variability is explained by the following factors listed in their order of importance: system application, pump driver, operating mode, reactor type, pump type, and unidentified plant-specific influences. Quantitative failure rate adjustments are provided for the effects of these factors. In the case of catastrophic time-dependent pump failures, the failure rate variability is explained by three factors: reactor type, pump driver, and unidentified plant-specific influences. Finally, point and confidence interval failure rate estimates are provided for each selected pump by considering the influential factors. Both types of estimates represent an improvement over the estimates computed exclusively from the data on each pump

  9. Estimation of component failure rates for PSA on nuclear power plants 1982-1997

    International Nuclear Information System (INIS)

    Kirimoto, Yukihiro; Matsuzaki, Akihiro; Sasaki, Atsushi

    2001-01-01

    Probabilistic safety assessment (PSA) on nuclear power plants has been studied for many years by the Japanese industry. The PSA methodology has been improved so that PSAs for all commercial LWRs were performed and used to examine for accident management.On the other hand, most data of component failure rates in these PSAs were acquired from U.S. databases. Nuclear Information Center (NIC) of Central Research Institute of Electric Power Industry (CRIEPI) serves utilities by providing safety- , and reliability-related information on operation and maintenance of the nuclear power plants, and by evaluating the plant performance and incident trends. So, NIC started a research study on estimating the major component failure rates at the request of the utilities in 1988. As a result, we estimated the hourly-failure rates of 47 component types and the demand-failure rates of 15 component types. The set of domestic component reliability data from 1982 to 1991 for 34 LWRs has been evaluated by a group of PSA experts in Japan at the Nuclear Safety Research Association (NSRA) in 1995 and 1996, and the evaluation report was issued in March 1997. This document describes the revised component failure rate calculated by our re-estimation on 49 Japanese LWRs from 1982 to 1997. (author)

  10. Failure cause and failure rate evaluation on pumps of BWR plants in PSA. Hypothesis testing for typical or plant specific failure rate of pumps

    International Nuclear Information System (INIS)

    Sanada, Takahiro; Nakamura, Makoto

    2009-01-01

    In support of domestic nuclear industry effort to gather and analyze failure data of components concerning nuclear power plants, Nuclear Information Archives (NUCIA) are published for useful information to help PSA. This report focuses on NUCIA pertaining to pumps in domestic nuclear power plants, and provides the reliable estimation on failure rate of pumps resulting from failure cause analysis and hypothesis testing of classified and plant specific failure rate of pumps for improving quality in PSA. The classified and plant specific failure rate of pumps are estimated by analyzing individual domestic nuclear power plant's data of 26 Boiling Water Reactors (BWRs) concerning functionally structurally classified pump failures reported from beginning of commercial operation to March 31, 2007. (author)

  11. Failure rate and reliability of the KOMATSU hydraulic excavator in surface limestone mine

    Science.gov (United States)

    Harish Kumar N., S.; Choudhary, R. P.; Murthy, Ch. S. N.

    2018-04-01

    The model with failure rate function of bathtub-shaped is helpful in reliability analysis of any system and particularly in reliability associated privative maintenance. The usual Weibull distribution is, however, not capable to model the complete lifecycle of the any with a bathtub-shaped failure rate function. In this paper, failure rate and reliability analysis of the KOMATSU hydraulic excavator/shovel in surface mine is presented and also to improve the reliability and decrease the failure rate of each subsystem of the shovel based on the preventive maintenance. The model of the bathtub-shaped for shovel can also be seen as a simplification of the Weibull distribution.

  12. Markov approach to evaluate the availability simulation model for power generation system in a thermal power plant ,

    Directory of Open Access Journals (Sweden)

    Avdhesh Kr. Sharma

    2012-10-01

    Full Text Available In recent years, the availability of power plants has become increasingly important issue in most developed and developing countries. This paper aims to propose a methodology based on Markov approach to evaluate the availability simulation model for power generation system (Turbine in a thermal power plant under realistic working environment. The effects of occurrence of failure/course of actions and availability of repair facilities on system performance have been investigated. Higher availability of the components/equipments is inherently associated with their higher reliability and maintainability. The power generation system consists of five subsystems with four possible states: full working, reduced capacity, reduced efficiency and failed state. So, its availability should be carefully evaluated in order to foresee the performance of the power plant. The availability simulation model (Av. has been developed with the help of mathematical formulation based on Markov Birth-Death process using probabilistic approach. For this purpose, first differential equations have been generated. These equations are then solved using normalizing condition so as to determine the steady state availability of power generation system. In fact, availability analysis is very much effective in finding critical subsystems and deciding their preventive maintenance program for improving availability of the power plant as well as the power supply. From the graphs illustrated, the optimum values of failure/repair rates for maximum availability, of each subsystem is analyzed and then maintenance priorities are decided for all subsystems.The present paper highlights that in this system, Turbine governing subsystem is most sensitive demands more improvement in maintainability as compared to the other subsystems. While Turbine lubrication subsystem is least sensitive.

  13. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  14. Small, modular, low-cost coal-fired power plants for the international market

    Energy Technology Data Exchange (ETDEWEB)

    Zauderer, B.; Frain, B.; Borck, B. [Coal Tech Corp., Merion Station, PA (United States); Baldwin, A.L. [Dept. of Energy, Pittsburgh, PA (United States). Pittsburgh Energy Technology Center

    1997-12-31

    This paper presents recent operating results of Coal Tech`s second generation, air cooled, slagging coal combustor, and its application to power plants in the 1 to 20 MW range. This 20 MMBtu/hour combustor was installed in a new demonstration plant in Philadelphia, PA in 1995. It contains the combustion components of a 1 MWe coal fired power plant, a 17,500 lb/hour steam boiler, coal storage and feed components, and stack gas cleanup components. The plant`s design incorporates improvements resulting from 2,000 hours of testing between 1987 and 1993 on a first generation, commercial scale, air cooled combustor of equal thermal rating. Since operations began in early 1996, a total of 51 days of testing have been successfully completed. Major results include durability of the combustor`s refractory wall, excellent combustion with high ash concentration in the fuel, removal of 95% to 100% of the slag in the combustor, very little ash deposition in the boiler, major reduction of in-plant parasitic power, and simplified power system control through the use of modular designs of sub-systems and computer control. Rapid fuel switching between oil, gas, and coal and turndown of up to a factor of three was accomplished. All these features have been incorporated in advanced coal fired plant designs in the 1 to 20 MWe range. Incremental capital costs are only $100 to $200/kW higher than comparable rated gas or oil fired steam generating systems. Most of its components and subsystems can be factory assembled for very rapid field installation. The low capital, low operating costs, fuel flexibility, and compatibility with very high ash fuels, make this power system very attractive in regions of the world having domestic supplies of these fuels.

  15. Simulation modeling and analysis of a complex system of a thermal power plant

    Directory of Open Access Journals (Sweden)

    Sorabh Gupta

    2009-09-01

    Full Text Available The present paper deals with the opportunities for the modeling of flue gas and air system of a thermal power plant by making the performance evaluation using probabilistic approach. The present system of thermal plant under study consists of four subsystems with three possible states: full working, reduced capacity working and failed. Failure and repair rates for all the subsystems are assumed to be constant. Formulation of the problem is carried out using Markov Birth-Death process using probabilistic approach and a transition diagram represents the operational behavior of the system. Interrelationship among the full working and reduced working has been developed. A probabilistic model has been developed, considering some assumptions. Data in feasible range are selected from a survey of thermal plant and the effect of each subsystem on the system availability is tabulated in the form of availability matrices, which provides various performance/availability levels for different combinations of failure and repair rates of all subsystems. Based upon various availability values obtained in availability matrices and graphs of failure/repair rates of different subsystems, performance and optimum values of failure/repair rates for maximum availability, of each subsystem is analyzed and then maintenance priorities are decided for all subsystems.

  16. Thermal Integration of CO{sub 2} Compression Processes with Coal-Fired Power Plants Equipped with Carbon Capture

    Energy Technology Data Exchange (ETDEWEB)

    Edward Levy

    2012-06-29

    Coal-fired power plants, equipped either with oxycombustion or post-combustion CO{sub 2} capture, will require a CO{sub 2} compression system to increase the pressure of the CO{sub 2} to the level needed for sequestration. Most analyses show that CO{sub 2} compression will have a significant effect on parasitic load, will be a major capital cost, and will contribute significantly to reduced unit efficiency. This project used first principle engineering analyses and computer simulations to determine the effects of utilizing compressor waste heat to improve power plant efficiency and increase net power output of coal-fired power plants with carbon capture. This was done for units with post combustion solvent-based CO{sub 2} capture systems and for oxyfired power plants, firing bituminous, PRB and lignite coals. The thermal integration opportunities analyzed for oxycombustion capture are use of compressor waste heat to reheat recirculated flue gas, preheat boiler feedwater and predry high-moisture coals prior to pulverizing the coal. Among the thermal integration opportunities analyzed for post combustion capture systems are use of compressor waste heat and heat recovered from the stripper condenser to regenerate post-combustion CO{sub 2} capture solvent, preheat boiler feedwater and predry high-moisture coals. The overall conclusion from the oxyfuel simulations is that thermal integration of compressor heat has the potential to improve net unit heat rate by up to 8.4 percent, but the actual magnitude of the improvement will depend on the type of heat sink used and to a lesser extent, compressor design and coal rank. The simulations of a unit with a MEA post combustion capture system showed that thermal integration of either compressor heat or stripper condenser heat to preheat boiler feedwater would result in heat rate improvements from 1.20 percent to 4.19 percent. The MEA capture simulations further showed that partial drying of low rank coals, done in combination

  17. An analysis of human maintenance failures of a nuclear power plant

    International Nuclear Information System (INIS)

    Pyy, P.

    2000-01-01

    In the report, a study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant safety and system availability. More than 4400 maintenance history reports from the years 1992-1994 of Olkiluoto BWR nuclear power plant (NPP) were analysed together with the maintenance personnel. The human action induced faults were classified, e.g., according to their multiplicity and effects. This paper presents and discusses the results of a statistical analysis of the data. Instrumentation and electrical components appeared to be especially prone to human failures. Many human failures were found in safety related systems. Several failures also remained latent from outages to power operation. However, the safety significance of failures was generally small. Modifications were an important source of multiple human failures. Plant maintenance data is a good source of human reliability data and it should be used more in the future. (orig.)

  18. Basic factors to forecast maintenance cost and failure processes for nuclear power plants

    International Nuclear Information System (INIS)

    Popova, Elmira; Yu, Wei; Kee, Ernie; Sun, Alice; Richards, Drew; Grantom, Rick

    2006-01-01

    Two types of maintenance interventions are usually administered at nuclear power plants: planned and corrective. The cost incurred includes the labor (manpower) cost, cost for new parts, or emergency order of expensive items. At the plant management level there is a budgeted amount of money to be spent every year for such operations. It is very important to have a good forecast for this cost since unexpected events can trigger it to a very high level. In this research we present a statistical factor model to forecast the maintenance cost for the incoming month. One of the factors is the expected number of unplanned (due to failure) maintenance interventions. We introduce a Bayesian model for the failure rate of the equipment, which is input to the cost forecasting model. The importance of equipment reliability and prediction in the commercial nuclear power plant is presented along with applicable governmental and industry organization requirements. A detailed statistical analysis is performed on a set of maintenance cost and failure data gathered at the South Texas Project Nuclear Operating Company (STPNOC) in Bay City, Texas, USA

  19. Impact of mechanical- and maintenance-induced failures of main reactor coolant pump seals on plant safety

    International Nuclear Information System (INIS)

    Azarm, M.A.; Boccio, J.L.; Mitra, S.

    1985-12-01

    This document presents an investigation of the safety impact resulting from mechanical- and maintenance-induced reactor coolant pump (RCP) seal failures in nuclear power plants. A data survey of the pump seal failures for existing nuclear power plants in the US from several available sources was performed. The annual frequency of pump seal failures in a nuclear power plant was estimated based on the concept of hazard rate and dependency evaluation. The conditional probability of various sizes of leak rates given seal failures was then evaluated. The safety impact of RCP seal failures, in terms of contribution to plant core-melt frequency, was also evaluated for three nuclear power plants. For leak rates below the normal makeup capacity and the impact of plant safety were discussed qualitatively, whereas for leak rates beyond the normal make up capacity, formal PRA methodologies were applied. 22 refs., 17 figs., 19 tabs

  20. Failure Investigation of Radiant Platen Superheater Tube of Thermal Power Plant Boiler

    Science.gov (United States)

    Ghosh, D.; Ray, S.; Mandal, A.; Roy, H.

    2015-04-01

    This paper highlights a case study of typical premature failure of a radiant platen superheater tube of 210 MW thermal power plant boiler. Visual examination, dimensional measurement and chemical analysis, are conducted as part of the investigations. Apart from these, metallographic analysis and fractography are also conducted to ascertain the probable cause of failure. Finally it has been concluded that the premature failure of the super heater tube can be attributed to localized creep at high temperature. The corrective actions has also been suggested to avoid this type of failure in near future.

  1. An approach to integrating surveillance and maintenance tasks to prevent the dominant failure causes of critical components

    International Nuclear Information System (INIS)

    Martorell, S.; Munoz, A.; Serradell, V.

    1995-01-01

    Surveillance requirements and maintenance activities in a nuclear power plant aim to preserve components' inherent reliability. Up to now, predictive and preventive maintenance mainly concerned plant staff, but the US Nuclear Regulatory Commission Maintenance Rule released in July 1991 will have significant impact on how nuclear power plants perform and document this maintenance. Reliability Centered Maintenance (RCM) is a systematic methodology to establish maintenance tasks for critical components in plant with a high degree of compliance with the goals of the Rule. RCM pursues the identification of applicable and efficient tasks to prevent these components from developing their dominant failure causes, and, in turn, towards achieving proper levels of components availability with low cost. In this paper, we present an approach for identifying the most suitable set of tasks to achieve this goal, which involves the integration of maintenance activities and surveillance requirements for each critical component based on the unavailability and cost associated with each individual task which is performed on it

  2. Trend analysis of cables failure events at nuclear power plants

    International Nuclear Information System (INIS)

    Fushimi, Yasuyuki

    2007-01-01

    In this study, 152 failure events related with cables at overseas nuclear power plants are selected from Nuclear Information Database, which is owned by The Institute of Nuclear Safety System, and these events are analyzed in view of occurrence, causal factor, and so on. And 15 failure events related with cables at domestic nuclear power plants are selected from Nuclear Information Archives, which is owned by JANTI, and these events are analyzed by the same manner. As a result of comparing both trends, it is revealed following; 1) A cable insulator failure rate is lower at domestic nuclear power plants than at foreign ones. It is thought that a deterioration diagnosis is performed broadly in Japan. 2) Many buried cables failure events have been occupied a significant portion of cables failure events during work activity at overseas plants, however none has been occurred at domestic plants. It is thought that sufficient survey is conducted before excavating activity in Japan. 3) A domestic age related cables failure rate in service is lower than the overseas one and domestic improper maintenance rate is higher than the overseas one. Maintenance worker' a skill improvement is expected in order to reduce improper maintenance. (author)

  3. Statistical analysis of human maintenance failures of a nuclear power plant

    International Nuclear Information System (INIS)

    Pyy, P.

    2000-01-01

    In this paper, a statistical study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant safety and system availability. More than 4400 maintenance history reports from the years 1992-1994 of Olkiluoto BWR nuclear power plant (NPP) were analysed together with the maintenance personnel. The human action induced faults were classified, e.g., according to their multiplicity and effects. This paper presents and discusses the results of a statistical analysis of the data. Instrumentation and electrical components are especially prone to human failures. Many human failures were found in safety related systems. Similarly, several failures remained latent from outages to power operation. The safety significance was generally small. Modifications are an important source of multiple human failures. Plant maintenance data is a good source of human reliability data and it should be used more, in future. (orig.)

  4. Relative population exposures from coal-fired and nuclear power plants in India

    Energy Technology Data Exchange (ETDEWEB)

    Ramachandran, T.V.; Lalit, B.Y.; Mishra, U.C.

    1987-01-01

    Coal combustion for electric power generation results in dispersal of fly ash, and hence an additional radiation dose to the population living in the neighbourhood of the coal-fired power plants due to natural radioactivity present in coal. The radiation hazards of coal based and nuclear power plants operating in India are given. The dose commitments to the population living within an 88.5 km radius of the thermal and nuclear power plants in India have been computed using the method outlined in an ORNL report. The estimated dose rates for these two types of power plant were compared. The present study shows that the radiation dose from coal-fired and nuclear power plants are comparable.

  5. Radiological investigation in the boiler's maintenance operations in a Coal-Fired power plant

    International Nuclear Information System (INIS)

    Robles, Beatriz; Mora, Juan C.; Cancio, David; Baeza, Antonio; Corbacho, Jose A.

    2008-01-01

    As part of a study being performed in the four biggest coal-fired power plants in Spain, the formation of scales of radioisotopes in parts of the heat recovery system was investigated. This effect should be more important in the case of 210 Po and 210 Pb. Thereby, it is likely in given specific chemical conditions that scales could be formed with a high concentration of 210 Pb, probably in secular equilibrium with 210 Po and 210 Bi. Those scales could reach activity concentrations of some hundreds of Bq g -1 . In order to study within the boiler this scale formation, an investigation during the maintenance operations programmed in the 'Compostilla' coal-fired power plant (Ponferrada-Spain) was carried out. Those operations are performed each 2-3 years and last for around 30 or 40 days. Measurements of ambient dose equivalent (H * (10)) in the boiler before and after the entrance of the operators, together with beta surface contamination on the bottom ashes attached in the walls and on the tubes, were performed. The last measurements were carried out for screening purposes in order to select those areas on the tubes which could present Po scales. Even if chemical conditions are in general oxidising within the boiler, since conditions are not homogeneous, some zones were localized in which surface contamination was measured. In these spots, samples were collected and then measured in the laboratory. Moreover, an analysis of maintenance tasks, used personal protection equipment, working times and other important parameters was also carried out. This analysis is important in order to perform radiological evaluations, as realistic as possible, of the effective doses that could be received by maintenance operators. In the present study, the values of the measurements performed and the results of the assessment of the effective doses for the workers are presented. (author)

  6. Effect of water side deposits on the energy performance of coal fired thermal power plants

    International Nuclear Information System (INIS)

    Bhatt, M. Siddhartha

    2006-01-01

    This paper presents the effects of water side deposits in the 210 MW coal fired thermal power plant components (viz., boiler, turbine, feed water heaters, condensers and lube oil coolers) on the energy efficiency of these components and that of the overall system at 100% maximum continuous rating (MCR). The origin, composition and rate of build up of deposits on the water side are presented. A linear growth rate of deposits is assumed for simplicity. The effects of the reduction in heat transfer, increased pressure drop and increased pumping power/reduced power output in the components are quantified in the form of curve fits as functions of the deposit thickness (μm). The reduction in heat transfer in the boiler components is in the range of 0.2-2.0% under normal scaling. The increased pumping power is of the order of 0.6-7.6% in the boiler components, 29% in the BFP circuit, 26% in the LPH circuit, 21% in the HPH circuit and 18% in the lube oil cooler circuits. The effects on the overall coal fired plant is quantified through functional relations between the efficiencies and the notional deposit thickness. The sensitivity indices to the notional deposit thickness are: boiler efficiency: -0.0021% points/μm, turbine circuit efficiency: -0.0037% points/μm, auxiliary power efficiency: -0.00129% points/μm, gross overall efficiency: -0.0039% points/μm and net overall efficiency: -0.0040% points/μm. The overall effect of scale build up is either increased power input of ∼68 kW/μm (at a constant power output) or decreased power output ∼25 kW/μm (at a constant power input). Successful contaminant control techniques are highlighted. Capacity reduction effects due to water side deposits are negligible

  7. Common cause failure rate estimates for diesel generators in nuclear power plants

    International Nuclear Information System (INIS)

    Steverson, J.A.; Atwood, C.L.

    1982-01-01

    Common cause fault rates for diesel generators in nuclear power plants are estimated, using Licensee Event Reports for the years 1976 through 1978. The binomial failure rate method, used for obtaining the estimates, is briefly explained. Issues discussed include correct classification of common cause events, grouping of the events into homogeneous data subsets, and dealing with plant-to-plant variation

  8. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K. [VTT Industrial Systems, Espoo (Finland)

    2006-12-15

    inspections and functional testing. Such a planning case shall include a need evaluation of both the component and system level testing at the end of work. In addition, the use of condition monitoring information helps in reducing the uncertainty about equipment operability after intrusive maintenance or modifications. An increased use of condition information for a situation specific steering of preventive maintenance actions could also help to avoid unnecessary predetermined preventive maintenance actions which have the potential to cause unnecessary failures. A more agile adjustment of work orders to correspond the new conditions identified by maintenance personnel locally during work was also found necessary to reduce human CCFs caused by e.g. missing testing or inspections. The results emphasize the responsibility and requirements of versatility and specialisation of the planning and performance of maintenance and operability verification which brings this work to a knowledge work. For instance, flexibility is needed for the adaptation to specific conditions of the equipment and work as well as adhering to the rules and procedures is required. And mostly both a specialist knowledge of the equipment and a functional overview of the system are required. The event and error analyses of the multiple and single errors would help in training the maintenance, operation and technical personnel to identify better error mechanisms and prevent undetected human CCFs and errors, too. An earlier and better defined examination of the CCF risks as a part of the failure reporting and repair and modification processes would also help to identify, investigate and prevent CCFs. Generally, operability verification of the work objects in plant equipment should be planned and implemented better as an integral part of the plant maintenance process requiring knowledge of both the maintenance and operation branches. Methods for analysis of maintenance history information, examples of presentation

  9. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Laakso, K.

    2006-12-01

    inspections and functional testing. Such a planning case shall include a need evaluation of both the component and system level testing at the end of work. In addition, the use of condition monitoring information helps in reducing the uncertainty about equipment operability after intrusive maintenance or modifications. An increased use of condition information for a situation specific steering of preventive maintenance actions could also help to avoid unnecessary predetermined preventive maintenance actions which have the potential to cause unnecessary failures. A more agile adjustment of work orders to correspond the new conditions identified by maintenance personnel locally during work was also found necessary to reduce human CCFs caused by e.g. missing testing or inspections. The results emphasize the responsibility and requirements of versatility and specialisation of the planning and performance of maintenance and operability verification which brings this work to a knowledge work. For instance, flexibility is needed for the adaptation to specific conditions of the equipment and work as well as adhering to the rules and procedures is required. And mostly both a specialist knowledge of the equipment and a functional overview of the system are required. The event and error analyses of the multiple and single errors would help in training the maintenance, operation and technical personnel to identify better error mechanisms and prevent undetected human CCFs and errors, too. An earlier and better defined examination of the CCF risks as a part of the failure reporting and repair and modification processes would also help to identify, investigate and prevent CCFs. Generally, operability verification of the work objects in plant equipment should be planned and implemented better as an integral part of the plant maintenance process requiring knowledge of both the maintenance and operation branches. Methods for analysis of maintenance history information, examples of presentation

  10. Radioactivity of coals and ash and slag wastes at coal-fired thermal power plants

    Science.gov (United States)

    Krylov, D. A.; Sidorova, G. P.

    2013-04-01

    This paper presents an analysis of published data on the content of radioactive nuclides in coals originating from various coal deposits, and in ash and slag wastes produced at coal-fired thermal power plants, as well as in fly ash emitted from thermal power plants into the atmosphere. Problems related to the use of coals with an elevated content of natural radionuclides (NRNs) and methods of their solution implemented at the Urtuyskoe coalfield are dealt with. Data on the analysis of Transbaikal coals for the NRN content, as well as weighted mean content of uranium and thorium in coals from the Siberian Region, are given. In order to reduce irradiation of plant personnel and the population of the areas where coal producers and coal-fired thermal power plants are located, it is necessary to organize very careful control of the NRN content in both coals and products of their combustion that are released into the environment. To solve the problem related to the control of radioactivity, the centralized approach and creation of a proper normative base are needed. Experience gained in developing the Urtuyskoe coalfield shows that it is possible to create an efficient system of coal quality control with respect to the radiation hygiene factor and provide protection of the environment and health of the population.

  11. Thermal Power Plant Performance Analysis

    CERN Document Server

    2012-01-01

    The analysis of the reliability and availability of power plants is frequently based on simple indexes that do not take into account the criticality of some failures used for availability analysis. This criticality should be evaluated based on concepts of reliability which consider the effect of a component failure on the performance of the entire plant. System reliability analysis tools provide a root-cause analysis leading to the improvement of the plant maintenance plan.   Taking in view that the power plant performance can be evaluated not only based on  thermodynamic related indexes, such as heat-rate, Thermal Power Plant Performance Analysis focuses on the presentation of reliability-based tools used to define performance of complex systems and introduces the basic concepts of reliability, maintainability and risk analysis aiming at their application as tools for power plant performance improvement, including: ·         selection of critical equipment and components, ·         defini...

  12. An Enhanced Preventive Maintenance Optimization Model Based on a Three-Stage Failure Process

    Directory of Open Access Journals (Sweden)

    Ruifeng Yang

    2015-01-01

    Full Text Available Nuclear power plants are highly complex systems and the issues related to their safety are of primary importance. Probabilistic safety assessment is regarded as the most widespread methodology for studying the safety of nuclear power plants. As maintenance is one of the most important factors for affecting the reliability and safety, an enhanced preventive maintenance optimization model based on a three-stage failure process is proposed. Preventive maintenance is still a dominant maintenance policy due to its easy implementation. In order to correspond to the three-color scheme commonly used in practice, the lifetime of system before failure is divided into three stages, namely, normal, minor defective, and severe defective stages. When the minor defective stage is identified, two measures are considered for comparison: one is that halving the inspection interval only when the minor defective stage is identified at the first time; the other one is that if only identifying the minor defective stage, the subsequent inspection interval is halved. Maintenance is implemented immediately once the severe defective stage is identified. Minimizing the expected cost per unit time is our objective function to optimize the inspection interval. Finally, a numerical example is presented to illustrate the effectiveness of the proposed models.

  13. Spacecraft electrical power subsystem: Failure behavior, reliability, and multi-state failure analyses

    International Nuclear Information System (INIS)

    Kim, So Young; Castet, Jean-Francois; Saleh, Joseph H.

    2012-01-01

    This article investigates the degradation and failure behavior of spacecraft electrical power subsystem (EPS) on orbit. First, this work provides updated statistical reliability and multi-state failure analyses of spacecraft EPS and its different constituents, namely the batteries, the power distribution, and the solar arrays. The EPS is shown to suffer from infant mortality and to be a major driver of spacecraft unreliability. Over 25% of all spacecraft failures are the result of EPS failures. As a result, satellite manufacturers may wish to pursue targeted improvement to this subsystem, either through better testing or burn-in procedures, better design or parts selection, or additional redundancy. Second, this work investigates potential differences in the EPS degradation and failure behavior for spacecraft in low earth orbits (LEO) and geosynchronous orbits (GEO). This analysis was motivated by the recognition that the power/load cycles and the space environment are significantly different in LEO and GEO, and as such, they may result in different failure behavior for the EPS in these two types of orbits. The results indicate, and quantify the extent to which, the EPS fails differently in LEO and GEO, both in terms of frequency and severity of failure events. A casual summary of the findings can be stated as follows: the EPS fails less frequently but harder (with fatal consequences to the spacecraft) in LEO than in GEO.

  14. Future CO2 emissions and electricity generation from proposed coal-fired power plants in India

    Science.gov (United States)

    Fofrich, R.; Shearer, C.; Davis, S. J.

    2017-12-01

    India represents a critical unknown in global projections of future CO2 emissions due to its growing population, industrializing economy, and large coal reserves. In this study, we assess existing and proposed construction of coal-fired power plants in India and evaluate their implications for future energy production and emissions in the country. In 2016, India had 369 coal-fired power plants under development totaling 243 gigawatts (GW) of generating capacity. These coal-fired power plants would increase India's coal-fired generating capacity by 123% and would exceed India's projected electricity demand. Therefore, India's current proposals for new coal-fired power plants would be forced to retire early or operate at very low capacity factors and/or would prevent India from meeting its goal of producing at least 40% of its power from renewable sources by 2030. In addition, future emissions from proposed coal-fired power plants would exceed India's climate commitment to reduce its 2005 emissions intensity 33% - 35% by 2030.

  15. An Improved Flexible Solar Thermal Energy Integration Process for Enhancing the Coal-Based Energy Efficiency and NOx Removal Effectiveness in Coal-Fired Power Plants under Different Load Conditions

    Directory of Open Access Journals (Sweden)

    Yu Han

    2017-09-01

    Full Text Available An improved flexible solar-aided power generation system (SAPG for enhancing both selective catalytic reduction (SCR de-NOx efficiency and coal-based energy efficiency of coal-fired power plants is proposed. In the proposed concept, the solar energy injection point is changed for different power plant loads, bringing about different benefits for coal-fired power generation. For partial/low load, solar energy is beneficially used to increase the flue gas temperature to guarantee the SCR de-NOx effectiveness as well as increase the boiler energy input by reheating the combustion air. For high power load, solar energy is used for saving steam bleeds from turbines by heating the feed water. A case study for a typical 1000 MW coal-fired power plant using the proposed concept has been performed and the results showed that, the SCR de-NOx efficiency of proposed SAPG could increase by 3.1% and 7.9% under medium load and low load conditions, respectively, as compared with the reference plant. The standard coal consumption rate of the proposed SAPG could decrease by 2.68 g/kWh, 4.05 g/kWh and 6.31 g/kWh for high, medium and low loads, respectively, with 0.040 USD/kWh of solar generated electricity cost. The proposed concept opens up a novel solar energy integration pattern in coal-fired power plants to improve the pollutant removal effectiveness and decrease the coal consumption of the power plant.

  16. Analysis and prevention of human failure in nuclear power plants

    International Nuclear Information System (INIS)

    Liu Xinshuan

    2001-01-01

    Based on the performances in Daya Bay Nuclear Power Plant and the common experience from the world nuclear industry, the features and usual kinds of human failures in nuclear power plants are highlighted and the prominent factors on the personal, external and decision problems which might cause the human failures are analyzed. Effective preventive measures have been proposed respectively. Some successful human-failure-prevention practices applied in the Daya Bay Nuclear Power Plant are illustrated specifically

  17. Performance analysis of US coal-fired power plants by measuring three DEA efficiencies

    International Nuclear Information System (INIS)

    Sueyoshi, Toshiyuki; Goto, Mika; Ueno, Takahiro

    2010-01-01

    Data Envelopment Analysis (DEA) has been widely used for performance evaluation of many organizations in private and public sectors. This study proposes a new DEA approach to evaluate the operational, environmental and both-unified performance of coal-fired power plants that are currently operating under the US Clean Air Act (CAA). The economic activities of power plants examined by this study are characterized by four inputs, a desirable (good) output and three undesirable (bad) outputs. This study uses Range-Adjusted Measure (RAM) because it can easily incorporate both desirable and undesirable outputs in the unified analytical structure. The output unification proposed in this study has been never investigated in the previous DEA studies even though such a unified measure is essential in guiding policy makers and corporate leaders. Using the proposed DEA approach, this study finds three important policy implications. First, the CAA has been increasingly effective on their environmental protection. The increased environmental performance leads to the enhancement of the unified efficiency. Second, the market liberalization/deregulation was an important business trend in the electric power industry. Such a business trend was legally prepared by US Energy Policy Act (EPAct). According to the level of the market liberalization, the United States is classified into regulated and deregulated states. This study finds that the operational and unified performance of coal-fired power plants in the regulated states outperforms those of the deregulated states because the investment on coal-fired power plants in the regulated states can be utilized as a financial tool under the rate-of-return criterion of regulation. The power plants in the deregulated states do not have such a regulation premium. Finally, plant managers need to balance between their environmental performance and operational efficiency.

  18. Statistical modeling of an integrated boiler for coal fired thermal power plant.

    Science.gov (United States)

    Chandrasekharan, Sreepradha; Panda, Rames Chandra; Swaminathan, Bhuvaneswari Natrajan

    2017-06-01

    The coal fired thermal power plants plays major role in the power production in the world as they are available in abundance. Many of the existing power plants are based on the subcritical technology which can produce power with the efficiency of around 33%. But the newer plants are built on either supercritical or ultra-supercritical technology whose efficiency can be up to 50%. Main objective of the work is to enhance the efficiency of the existing subcritical power plants to compensate for the increasing demand. For achieving the objective, the statistical modeling of the boiler units such as economizer, drum and the superheater are initially carried out. The effectiveness of the developed models is tested using analysis methods like R 2 analysis and ANOVA (Analysis of Variance). The dependability of the process variable (temperature) on different manipulated variables is analyzed in the paper. Validations of the model are provided with their error analysis. Response surface methodology (RSM) supported by DOE (design of experiments) are implemented to optimize the operating parameters. Individual models along with the integrated model are used to study and design the predictive control of the coal-fired thermal power plant.

  19. Novel Functionally Graded Thermal Barrier Coatings in Coal-Fired Power Plant Turbines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Jing [Indiana Univ., Indianapolis, IN (United States)

    2016-11-01

    This project presents a detailed investigation of a novel functionally graded coating material, pyrochlore oxide, for thermal barrier coating (TBC) in gas turbines used in coal-fired power plants. Thermal barrier coatings are refractory materials deposited on gas turbine components, which provide thermal protection for metallic components at operating conditions. The ultimate goal of this research is to develop a manufacturing process to produce the novel low thermal conductivity and high thermal stability pyrochlore oxide based coatings with improved high-temperature durability. The current standard TBC, yttria stabilized zirconia (YSZ), has service temperatures limited to <1200°C, due to sintering and phase transition at higher temperatures. In contrast, pyrochlore oxide, e.g., lanthanum zirconate (La2Zr2O7, LZ), has demonstrated lower thermal conductivity and better thermal stability, which are crucial to high temperature applications, such as gas turbines used in coal-fired power plants. Indiana University – Purdue University Indianapolis (IUPUI) has collaborated with Praxair Surface Technologies (PST), and Changwon National University in South Korea to perform the proposed research. The research findings are critical to the extension of current TBCs to a broader range of high-temperature materials and applications. Several tasks were originally proposed and accomplished, with additional new opportunities identified during the course of the project. In this report, a description of the project tasks, the main findings and conclusions are given. A list of publications and presentations resulted from this research is listed in the Appendix at the end of the report.

  20. An interval-valued reliability model with bounded failure rates

    DEFF Research Database (Denmark)

    Kozine, Igor; Krymsky, Victor

    2012-01-01

    The approach to deriving interval-valued reliability measures described in this paper is distinctive from other imprecise reliability models in that it overcomes the issue of having to impose an upper bound on time to failure. It rests on the presupposition that a constant interval-valued failure...... rate is known possibly along with other reliability measures, precise or imprecise. The Lagrange method is used to solve the constrained optimization problem to derive new reliability measures of interest. The obtained results call for an exponential-wise approximation of failure probability density...

  1. Failure modes of safety-related components at fires on nuclear power plants

    International Nuclear Information System (INIS)

    Aaslund, A.

    2000-03-01

    Probabilistic assessment methods can be used to identify specific plant vulnerabilities. Application of such methods can also facilitate selection among system design alternatives available for safety enhancements. The quality of assessment results is however strongly dependent on realistic and accurate input data for modelling of system component behaviour and failure modes during conditions to be assessed. Use of conservative input data may not lead to results providing guidance on safety upgrades. Adequate input data for probabilistic assessments seems to be lacking for at least failure modes of some electrical components when exposed to a fire. This report presents an attempt to improve the situation with respect to such input data. In order to take advantage of information in existing documentation of fire incident occurrences some of the lessons learned from the fire at Browns Ferry Nuclear Power Plant on March 22, 1975 are discussed in this report. Also a summary of results from different fire tests of electrical cables presented in a fire risk analysis report is a part of the references. The failure modes used to describe fire-induced damage are 'open circuit' and 'hot short' which seems to be commonly accepted terms within the branch. Definitions of the terms are included in the report. Effects of the failure modes when occurring in some of the channels of the reactor protection system are discussed with respect to the existing design of the reactor protection system at Ringhals 2 nuclear power unit. Experiences from the Browns Ferry fire and results from fire tests of electrical cables indicate that the dominating failure mode for electrical cables is 'open circuit'. An 'open circuit' failure leads to circuit disjunction and loss of continuity. The circuit can no longer transmit its signal or power. When affecting channels of the reactor protection system an 'open circuit' failure can cause extensive inadvertent actions of safety related equipment

  2. Statistical modeling of an integrated boiler for coal fired thermal power plant

    Directory of Open Access Journals (Sweden)

    Sreepradha Chandrasekharan

    2017-06-01

    Full Text Available The coal fired thermal power plants plays major role in the power production in the world as they are available in abundance. Many of the existing power plants are based on the subcritical technology which can produce power with the efficiency of around 33%. But the newer plants are built on either supercritical or ultra-supercritical technology whose efficiency can be up to 50%. Main objective of the work is to enhance the efficiency of the existing subcritical power plants to compensate for the increasing demand. For achieving the objective, the statistical modeling of the boiler units such as economizer, drum and the superheater are initially carried out. The effectiveness of the developed models is tested using analysis methods like R2 analysis and ANOVA (Analysis of Variance. The dependability of the process variable (temperature on different manipulated variables is analyzed in the paper. Validations of the model are provided with their error analysis. Response surface methodology (RSM supported by DOE (design of experiments are implemented to optimize the operating parameters. Individual models along with the integrated model are used to study and design the predictive control of the coal-fired thermal power plant. Keywords: Chemical engineering, Applied mathematics

  3. Exergy evaluation of a typical 330 MW solar-hybrid coal-fired power plant in China

    International Nuclear Information System (INIS)

    Peng, Shuo; Wang, Zhaoguo; Hong, Hui; Xu, Da; Jin, Hongguang

    2014-01-01

    Highlights: • Exergy analysis of solar-hybrid coal-fired power plant has been processed. • EUD method is utilized to obtain detailed information on the exergy destruction in each process. • Off-design thermodynamic performances are discussed to identify the advantages. • Exergy destruction of several parts under varying solar radiation is examined. - Abstract: This study discusses the thermodynamic performance of a solar-hybrid coal-fired power plant that uses solar heat with temperature lower than 300 °C to replace the extracted steam from a steam turbine to heat the feed water. Through this process, the steam that was to be extracted can efficiently expand in the steam turbine to generate electricity. The flow rate of steam returning to the turbine retains only a small part of the main stream, allowing the steam turbine to run close to design conditions for all DNI. A solar-only thermal power plant without storage is also discussed to illustrate the advantages of a solar-hybrid coal-fired power plant. The off-design performances of both plants are compared based on the energy-utilization diagram method. The exergy destruction of the solar-hybrid coal-fired power plant is found to be lower than that of the solar-only thermal power plant. The comparison of two plants, which may provide detailed information on internal phenomena, highlights several advantages of the solar-hybrid coal-fired power plant in terms of off-design operation: lower exergy destruction in the solar feed water heater and steam turbine and higher exergy and solar-to-electricity efficiency. Preliminary technological economic performances of both plants are compared. The results obtained in this study indicate that a solar-hybrid coal-fired power plant could achieve better off-design performance and economic performance than a solar-only thermal power plant

  4. Periodic imperfect preventive maintenance with two categories of competing failure modes

    Energy Technology Data Exchange (ETDEWEB)

    Zequeira, R.I. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: romulo.zequeira@utt.fr; Berenguer, C. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: christophe.berenguer@utt.fr

    2006-04-15

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists.

  5. Periodic imperfect preventive maintenance with two categories of competing failure modes

    International Nuclear Information System (INIS)

    Zequeira, R.I.; Berenguer, C.

    2006-01-01

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists

  6. Failure analysis and failure prevention in electric power systems

    International Nuclear Information System (INIS)

    Rau, C.A. Jr.; Becker, D.G.; Besuner, P.M.; Cipolla, R.C.; Egan, G.R.; Gupta, P.; Johnson, D.P.; Omry, U.; Tetelman, A.S.; Rettig, T.W.; Peters, D.C.

    1977-01-01

    New methods have been developed and applied to better quantify and increase the reliability, safety, and availability of electric power plants. Present and potential problem areas have been identified both by development of an improved computerized data base of malfunctions in nuclear power plants and by detailed metallurgical and mechanical failure analyses of selected problems. Significant advances in the accuracy and speed of structural analyses have been made through development and application of the boundary integral equation and influence function methods of stress and fracture mechanics analyses. The currently specified flaw evaluation procedures of the ASME Boiler and Pressure Vessel Code have been computerized. Results obtained from these procedures for evaluation of specific in-service inspection indications have been compared with results obtained utilizing the improved analytical methods. Mathematical methods have also been developed to describe and analyze the statistical variations in materials properties and in component loading, and uncertainties in the flaw size that might be passed by quality assurance systems. These new methods have been combined to develop accurate failure rate predictions based upon probabilistic fracture mechanics. Improved failure prevention strategies have been formulated by combining probabilistic fracture mechanics and cost optimization techniques. The approach has been demonstrated by optimizing the nondestructive inspection level with regard to both reliability and cost. (Auth.)

  7. Off-design thermodynamic performances on typical days of a 330 MW solar aided coal-fired power plant in China

    International Nuclear Information System (INIS)

    Peng, Shuo; Hong, Hui; Wang, Yanjuan; Wang, Zhaoguo; Jin, Hongguang

    2014-01-01

    Highlights: • Optical loss and heat loss of solar field under different turbine load were investigated. • Off-design thermodynamic feature was disclosed by analyzing several operational parameters. • Possible schemes was proposed to improve the net solar-to-electricity efficiency. - Abstract: The contribution of mid-temperature solar thermal power to improve the performance of coal-fired power plant is analyzed in the present paper. In the solar aided coal-fired power plant, solar heat at <300 °C is used to replace the extracted steam from the steam turbine to heat the feed water. In this way, the steam that was to be extracted could consequently expand in the steam turbine to boost output power. The advantages of a solar aided coal-fired power plant in design condition have been discussed by several researchers. However, thermodynamic performances on off-design operation have not been well discussed until now. In this paper, a typical 330 MW coal-fired power plant in Sinkiang Province of China is selected as the case study to demonstrate the advantages of the solar aided coal-fired power plant under off-design conditions. Hourly thermodynamic performances are analyzed on typical days under partial load. The effects of several operational parameters, such as solar irradiation intensity, incident angle, flow rate of thermal oil, on the performance of solar field efficiency and net solar-to-electricity efficiency were examined. Possible schemes have been proposed for improving the solar aided coal-fired power plant on off-design operation. The results obtained in the current study could provide a promising approach to solve the poor thermodynamic performance of solar thermal power plant and also offer a basis for the practical operation of MW-scale solar aided coal-fired power plant

  8. Coal fired power plant fireside problems

    International Nuclear Information System (INIS)

    Mayer, P.; Manolescu, A.V.

    1984-01-01

    This paper describes the recent experience with fireside problems in coal fired subcritical boilers at Ontario Hydro*, and is concerned with boiler tube wastage. Problems with other components such as burners, air pre-heaters and ''back-end'' ductwork are not discussed. In most utilities, boiler tube failures account for a sizable portion of the total forced outages (typically about25%) as well as a very large part of the maintenance outages. The failures shown under the external deterioration category are of interest because they indicate the proportion of problems caused by the tube metal wastage processes initiated on the fireside of the boilers. Fireside problems remain an important cause of boiler tube failures year after year in spite of concentrated efforts to mitigate them

  9. Failure analysis of a boiler tube in USC coal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Lee, N.H.; Kim, S.; Choe, B.H.; Yoon, K.B.; Kwon, D.I. [Kangnung National University, Kangnung (Republic of Korea)

    2009-10-15

    This paper presents failure analysis of final superheater tube in ultra-supercritical (USC) coal power plant. Visual inspection was performed to find out the characteristics of fracture of the as-received material. And the micro-structural changes such as grain growth and carbide coarsening was examined by scanning electron microscope. Detailed microscopic studies were made to find out the behavior of the scale exfoliation on the waterside of tubes. From those investigations, the creep rupture may be caused by the softened structure induced by carbide coarsening and accelerated by the metal temperature increase by the impediment of heat transfer due to voids.

  10. Analysis of failure and maintenance experiences of motor operated valves in a Finnish nuclear power plant

    International Nuclear Information System (INIS)

    Simola, K.; Laakso, K.

    1992-01-01

    Operating experiences from 1981 up to 1989 of totally 104 motor operated closing valves (MOV) in different safety systems at TVO I and II nuclear power units were analysed in a systematic way. The qualitative methods used were failure mode and effects analysis (FMEA) and maintenance effects and criticality analysis (MECA). The failure descriptions were obtained from power plant's computerized failure reporting system. The reported 181 failure events were reanalysed and sorted according to specific classifications developed for the MOV function. Filled FMEA and MECA sheets on individual valves were stored in a microcomputer data base for further analyses. Analyses were performed for the failed mechanical and electrical valve parts, ways of detection of failure modes, failure effects, and repair and unavailability times

  11. Extensive feedwater quality control and monitoring concept for preventing chemistry-related failures of boiler tubes in a subcritical thermal power plant

    International Nuclear Information System (INIS)

    Vidojkovic, Sonja; Onjia, Antonije; Matovic, Branko; Grahovac, Nebojsa; Maksimovic, Vesna; Nastasovic, Aleksandra

    2013-01-01

    Prevention and minimizing corrosion processes on steam generating equipment is highly important in the thermal power industry. The maintenance of feedwater quality at a level corresponding to the standards of technological designing, followed by timely respond to the fluctuation of measured parameters, has a decisive role in corrosion prevention. In this study, the comprehensive chemical control of feedwater quality in 210 MW Thermal Power Plant (TPP) was carried out in order to evaluate its potentiality to assure reliable function of the boiler and discover possible irregularity that might be responsible for frequent boiler tube failures. Sensitive on-line and off-line analytical instruments were used for measuring key and diagnostic parameters considered to be crucial for boiler safety and performances. Obtained results provided evidences for exceeded levels of oxygen, silica, sodium, chloride, sulfate, copper, and conductivity what distinctly demonstrated necessity of feedwater control improvement. Consequently, more effective feedwater quality monitoring concept was recommended. In this paper, the explanation of presumable root causes of corrosive contaminants was given including basic directions for their maintenance in proscribed limits. -- Highlights: • Feedwater quality monitoring practice in a thermal power plant has been evaluated. • The more efficient feedwater quality control have been applied. • Analysis of feedwater quality parameters has been performed. • Exceeded levels of corrosive contaminants were found. • Recommendations for their maintenance at proscribed values were given

  12. Failure analysis of boiler tubes in lakhra coal power plant

    International Nuclear Information System (INIS)

    Shah, A.; Baluch, M.M.; Ali, A.

    2010-01-01

    Present work deals with the failure analysis of a boiler tube in Lakhra fluidized bed combustion power station. Initially, visual inspection technique was adopted to analyse the fractured surface. Detailed microstructural investigations of the busted boiler tube were carried out using light optical microscope and scanning electron microscope. The hardness tests were also performed. A 50 percent decrease in hardness of intact portion of the tube material and from area adjacent to failure was measured, which was found to be in good agreement with the wall thicknesses measured of the busted boiler tube i.e. 4 mm and 2 mm from unaffected portion and ruptured area respectively. It was concluded that the major cause of failure of boiler tube is erosion of material which occurs due the coal particles strike at the surface of the tube material. Since the temperature of boiler is not maintained uniformly. The variations in boiler temperature can also affect the material and could be another reason for the failure of the tube. (author)

  13. Boiler tube failure prevention in fossil fired boilers

    International Nuclear Information System (INIS)

    Townsend, R.D.

    1993-01-01

    It is the common experience of power generating companies worldwide that the main causes of forced outages on power plant are those due to boiler tube failures on fossil units. The main reason for the large number of failures are the severe environmental conditions in fossil boilers as the effects of stress, temperature, temperature gradients, corrosion, erosion and vibration combine to produce degradation of the tube steel. Corrosion by oxidation, by combustion products and by impure boiler water can significantly reduce the tube wall thickness and result in failure of a tube many years before its designed service life. Errors can also occur in the design manufacturer, storage, operation, and maintenance of boiler tubing and the wrong material installed in a critical location can lead to premature failure. Altogether, experts in the US and UK, from many different disciplines, have identified seven broad categories of boiler tube failure mechanisms. 1 tab., 2 figs

  14. Ways to Improve Russian Coal-Fired Power Plants

    International Nuclear Information System (INIS)

    Tumanovskii, A. G.; Olkhovsky, G. G.

    2015-01-01

    Coal is an important fuel for the electric power industry of Russia, especially in Ural and the eastern part of the country. It is fired in boilers of large (200 – 800 MW) condensing power units and in many cogeneration power plants with units rated at 50 – 180 MW. Many coal-fired power plants have been operated for more than 40 – 50 years. Though serviceable, their equipment is obsolete and does not comply with the current efficiency, environmental, staffing, and availability standards. It is urgent to retrofit and upgrade such power plants using advanced equipment, engineering and business ideas. Russian power-plant engineering companies have designed such advanced power units and their equipment such as boilers, turbines, auxiliaries, process and environmental control systems similar to those produced by the world’s leading manufacturers. Their performance and ways of implementation are discussed

  15. Ways to Improve Russian Coal-Fired Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Tumanovskii, A. G., E-mail: vti@vti.ru; Olkhovsky, G. G. [JSC “All-Russia Thermal Engineering Institute,” (Russian Federation)

    2015-07-15

    Coal is an important fuel for the electric power industry of Russia, especially in Ural and the eastern part of the country. It is fired in boilers of large (200 – 800 MW) condensing power units and in many cogeneration power plants with units rated at 50 – 180 MW. Many coal-fired power plants have been operated for more than 40 – 50 years. Though serviceable, their equipment is obsolete and does not comply with the current efficiency, environmental, staffing, and availability standards. It is urgent to retrofit and upgrade such power plants using advanced equipment, engineering and business ideas. Russian power-plant engineering companies have designed such advanced power units and their equipment such as boilers, turbines, auxiliaries, process and environmental control systems similar to those produced by the world’s leading manufacturers. Their performance and ways of implementation are discussed.

  16. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  17. Water vulnerabilities for existing coal-fired power plants.

    Energy Technology Data Exchange (ETDEWEB)

    Elcock, D.; Kuiper, J.; Environmental Science Division

    2010-08-19

    This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements the Existing Plants Research Program's overall research effort by evaluating water issues that could impact power plants. Water consumption by all users in the United States over the 2005-2030 time period is projected to increase by about 7% (from about 108 billion gallons per day [bgd] to about 115 bgd) (Elcock 2010). By contrast, water consumption by coal-fired power plants over this period is projected to increase by about 21% (from about 2.4 to about 2.9 bgd) (NETL 2009b). The high projected demand for water by power plants, which is expected to increase even further as carbon-capture equipment is installed, combined with decreasing freshwater supplies in many areas, suggests that certain coal-fired plants may be particularly vulnerable to potential water demand-supply conflicts. If not addressed, these conflicts could limit power generation and lead to power disruptions or increased consumer costs. The identification of existing coal-fired plants that are vulnerable to water demand and supply concerns, along with an analysis of information about their cooling systems and related characteristics, provides information to help focus future research and development (R&D) efforts to help ensure that coal-fired generation demands are met in a cost-effective manner that supports sustainable water use. This study identified coal-fired power plants that are considered vulnerable to water demand and supply issues by using a geographical information system (GIS) that facilitated the analysis of plant-specific data for more than 500 plants in the NETL's Coal Power Plant Database (CPPDB) (NETL 2007a) simultaneously with 18 indicators of water demand and supply. Two types of demand indicators were

  18. A PERFORMANCE MODELING AND DECISION SUPPORT SYSTEM FOR A FEED WATER UNIT OF A THERMAL POWER PLANT

    Directory of Open Access Journals (Sweden)

    S. Gupta

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: The present paper discusses the performance modeling and decision support system for a feed water unit of a thermal power plant using the concept of performance analysis and modeling. A feed water unit ensures a proper supply of water for the sound functioning of a thermal power plant. The decision support system for a feed water unit has been developed with the help of performance modeling using a probabilistic approach. After drawing a transition diagram, differential equations are generated. After that, steady state probabilities are determined. Some decision matrices are also developed, which provide various performance levels for different combinations of failure and repair rates of all subsystems. Based upon various availability values obtained in decision matrices and plots of failure rates / repair rates of various subsystems, the performance of each subsystem is analyzed, and maintenance decisions are made for all subsystems.

    AFRIKAANSE OPSOMMING: Vertoningsanalise en –modellering word gedoen vir die toevoerwatersisteem van ‘n termiese kragstasie. Toevoerwater is ‘n belangrike factor vir die doeltreffende bedryf van ‘n kragstasie. Die vertoningsanalise en –model is probalisties van aard. ‘n Toestandoorgangsdiagram en bypassende differensiaalvergelykings word gebruik, gevolg deur bepaling van die bestandige sisteemtoestand. Bykomende aandag word gegee aan relevante subsisteme. Die vertoning van subsisteme word gebasseer op verskeie beskikbaarheidswaardes om sodoende instandhouding to optimiseer.

  19. Increasing flexibility of coal power plant by control system modifications

    Directory of Open Access Journals (Sweden)

    Marušić Ante

    2016-01-01

    Full Text Available Expanding implementation of intermittent renewable energy sources has already started to change the role of thermal power plants in energy systems across Europe. Traditionally base load plants are now forced to operate as peaking plants. A familiar transition in upcoming years is expected in Croatia and coal power plant operators are preparing accordingly. To evaluate cycling capabilities and control system operation for flexible operation of selected 210 MW coal plant, series of tests with different load gradients were performed and results were thoroughly analyzed. Two possible “bottlenecks” are identified, thermal stress in superheater header, and achievable ramping rate considering operational limitations of coal feeders, firing system and evaporator dynamics. Several unexpected readings were observed, usually caused by malfunctioning sensors and equipment, resulting in unexpected oscillations of superheated steam temperature. Based on superheater geometry and experimental data, maximal steam temperature gradient during ramping was evaluated. Since thermal stress was well inside the safety margins, the simulation model of the whole boiler was used to evaluate achievable ramping on electric side.

  20. Generic nuclear power plant component failure data bank

    International Nuclear Information System (INIS)

    Araujo Goes, A.G. de; Gibelli, S.M.O.

    1988-11-01

    This report consist in the development of a generic nuclear power plant component failure data bank. This data bank was implemented in a PC-XT microcomputer, IBM compatible, using the Open Access II program. Generic failure data tables for Westinghouse nuclear power plants and for general PWR power plants are presented. They are the final product of a research which included a preselection and a selection of data collected from the available sources in the library of CNEN (National Nuclear Energy Commission) and from the CIN/CNEN (Neclear Information Center). Futhermore, a proposal of evaluating models of average failure rates of pumps and valves are also presented. Through the electronic data bank one can easily have a generic view of failure rate ranges as well as failure models foe a certain component. It is very importante to develop procedures to collect and store generic failure data that can be quickly accessed, in order to update the Probabilistic Safety Study of Angra-1 and to used in studies which may have component failures of nuclear power plant safety systems. In the future, data specialization can be achieved by means of statistical calculations involving specific data collected from the operational experience of Angra-1 nuclear power plant and the generic data bank. (author) [pt

  1. A reliability-based preventive maintenance methodology for the projection spot welding machine

    Directory of Open Access Journals (Sweden)

    Fayzimatov Ulugbek

    2018-06-01

    Full Text Available An effective operations of a projection spot welding (PSW machine is closely related to the effec-tiveness of the maintenance. Timely maintenance can prevent failures and improve reliability and maintainability of the machine. Therefore, establishing the maintenance frequency for the welding machine is one of the most important tasks for plant engineers. In this regard, reliability analysis of the welding machine can be used to establish preventive maintenance intervals (PMI and to identify the critical parts of the system. In this reliability and maintainability study, analysis of the PSW machine was carried out. The failure and repair data for analysis were obtained from automobile manufacturing company located in Uzbekistan. The machine was divided into three main sub-systems: electrical, pneumatic and hydraulic. Different distributions functions for all sub-systems was tested and their parameters tabulated. Based on estimated parameters of the analyzed distribu-tions, PMI for the PSW machines sub-systems at different reliability levels was calculated. Finally, preventive measures for enhancing the reliability of the PSW machine sub-systems are suggested.

  2. Main factors for fatigue failure probability of pipes subjected to fluid thermal fluctuation

    International Nuclear Information System (INIS)

    Machida, Hideo; Suzuki, Masaaki; Kasahara, Naoto

    2015-01-01

    It is very important to grasp failure probability and failure mode appropriately to carry out risk reduction measures of nuclear power plants. To clarify the important factors for failure probability and failure mode of pipes subjected to fluid thermal fluctuation, failure probability analyses were performed by changing the values of a stress range, stress ratio, stress components and threshold of stress intensity factor range. The important factors for the failure probability are range, stress ratio (mean stress condition) and threshold of stress intensity factor range. The important factor for the failure mode is a circumferential angle range of fluid thermal fluctuation. When a large fluid thermal fluctuation acts on the entire circumferential surface of the pipe, the probability of pipe breakage increases, calling for measures to prevent such a failure and reduce the risk to the plant. When the circumferential angle subjected to fluid thermal fluctuation is small, the failure mode of piping is leakage and the corrective maintenance might be applicable from the viewpoint of risk to the plant. (author)

  3. Presenting a model of repair and preventing maintenance of Bushehr nuclear power plants analyzing the data of similar nuclear power plants

    International Nuclear Information System (INIS)

    Parikhan, Hammidreza

    1997-01-01

    Due to the increase application of nuclear energy for producing electricity, special attention must be paid to their maintenance activities in general and preventive maintenance in particular. It has been shown that a well established preventive maintenance programme will enhance the reliability and availability of nuclear power plants. A model of preventive maintenance for Buhehr nuclear power plant which is due to be completed by 2001 is developed. The prescribed model is based on past experiences of VVER nuclear power plants around the world. The utilized data is provided by International Atomic Energy Agency (IAEA) in Vienna, Austria. The data and past experiences reveal such important information as availability, energy loss, types of failures, duration of failure, etc. A strategy for designing a database is established. These data are then analyzed by statistical methods such as Pareto analysis, t-test, K-S test, analysis of variance, etc. The results of our analysis reveal important information in regard to establishment of a well-defined preventive maintenance programme in Buhshehr nuclear power plant. The results show that certain equipment such turbo-generator and control-rods play an important role in the maintenance of a VVER nuclear power plant. Other findings are discussed in great detail

  4. Tube failures due to cooling process problem and foreign materials in power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, J. [Kapar Energy Ventures Sdn Bhd, Jalan Tok Muda, Kapar 42200 (Malaysia); Purbolaksono, J., E-mail: judha@uniten.edu.m [Department of Mechanical Engineering, Universiti Tenaga Nasional, Km 7 Jalan Kajang-Puchong, Kajang 43009, Selangor (Malaysia); Beng, L.C. [Kapar Energy Ventures Sdn Bhd, Jalan Tok Muda, Kapar 42200 (Malaysia)

    2010-07-15

    Cooling process which uses water for heat transfer is an essential factor in coal-fired and nuclear plants. Loss of cooling upset can force the plants to shut down. In particular, this paper reports visual inspections and metallurgical examinations on the failed SA210-A1 right-hand side (RHS) water wall tube of a coal-fired plant. The water wall tube showed the abnormal outer surface colour and has failed with wide-open ductile rupture and thin edges indicating typical signs of short-term overheating. Metallurgical examinations confirmed the failed tube experiencing higher temperature operation. Water flow starvation due to restriction inside the upstream tube is identified as the main root cause of failure. The findings are important to take failure mitigation actions in the future operation. Discussion on the typical problems related to the cooling process in nuclear power plants is also presented.

  5. Tube failures due to cooling process problem and foreign materials in power plants

    International Nuclear Information System (INIS)

    Ahmad, J.; Purbolaksono, J.; Beng, L.C.

    2010-01-01

    Cooling process which uses water for heat transfer is an essential factor in coal-fired and nuclear plants. Loss of cooling upset can force the plants to shut down. In particular, this paper reports visual inspections and metallurgical examinations on the failed SA210-A1 right-hand side (RHS) water wall tube of a coal-fired plant. The water wall tube showed the abnormal outer surface colour and has failed with wide-open ductile rupture and thin edges indicating typical signs of short-term overheating. Metallurgical examinations confirmed the failed tube experiencing higher temperature operation. Water flow starvation due to restriction inside the upstream tube is identified as the main root cause of failure. The findings are important to take failure mitigation actions in the future operation. Discussion on the typical problems related to the cooling process in nuclear power plants is also presented.

  6. Failure investigation of a secondary super heater tube in a 140 MW thermal power plant

    Directory of Open Access Journals (Sweden)

    Atanu Saha

    2017-04-01

    Full Text Available This article describes the findings of a detailed investigation into the failure of a secondary super heater tube in a 140 MW thermal power plant. Preliminary macroscopic examinations along with visual examination, dimensional measurement and chemical analysis were carried out to deduce the probable cause of failure. In addition optical microscopy was a necessary supplement to understand the cause of failure. It was concluded that the tube had failed due to severe creep damage caused by high metal temperature during service. The probable causes of high metal temperature may be in sufficient flow of steam due to partial blockage, presence of thick oxide scale on ID surface, high flue gas temperature etc. rupture.

  7. REAL TIME PULVERISED COAL FLOW SOFT SENSOR FOR THERMAL POWER PLANTS USING EVOLUTIONARY COMPUTATION TECHNIQUES

    Directory of Open Access Journals (Sweden)

    B. Raja Singh

    2015-01-01

    Full Text Available Pulverised coal preparation system (Coal mills is the heart of coal-fired power plants. The complex nature of a milling process, together with the complex interactions between coal quality and mill conditions, would lead to immense difficulties for obtaining an effective mathematical model of the milling process. In this paper, vertical spindle coal mills (bowl mill that are widely used in coal-fired power plants, is considered for the model development and its pulverised fuel flow rate is computed using the model. For the steady state coal mill model development, plant measurements such as air-flow rate, differential pressure across mill etc., are considered as inputs/outputs. The mathematical model is derived from analysis of energy, heat and mass balances. An Evolutionary computation technique is adopted to identify the unknown model parameters using on-line plant data. Validation results indicate that this model is accurate enough to represent the whole process of steady state coal mill dynamics. This coal mill model is being implemented on-line in a 210 MW thermal power plant and the results obtained are compared with plant data. The model is found accurate and robust that will work better in power plants for system monitoring. Therefore, the model can be used for online monitoring, fault detection, and control to improve the efficiency of combustion.

  8. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  9. VALIDATION OF SPRING OPERATED PRESSURE RELIEF VALVE TIME TO FAILURE AND THE IMPORTANCE OF STATISTICALLY SUPPORTED MAINTENANCE INTERVALS

    Energy Technology Data Exchange (ETDEWEB)

    Gross, R; Stephen Harris, S

    2009-02-18

    The Savannah River Site operates a Relief Valve Repair Shop certified by the National Board of Pressure Vessel Inspectors to NB-23, The National Board Inspection Code. Local maintenance forces perform inspection, testing, and repair of approximately 1200 spring-operated relief valves (SORV) each year as the valves are cycled in from the field. The Site now has over 7000 certified test records in the Computerized Maintenance Management System (CMMS); a summary of that data is presented in this paper. In previous papers, several statistical techniques were used to investigate failure on demand and failure rates including a quantal response method for predicting the failure probability as a function of time in service. The non-conservative failure mode for SORV is commonly termed 'stuck shut'; industry defined as the valve opening at greater than or equal to 1.5 times the cold set pressure. Actual time to failure is typically not known, only that failure occurred some time since the last proof test (censored data). This paper attempts to validate the assumptions underlying the statistical lifetime prediction results using Monte Carlo simulation. It employs an aging model for lift pressure as a function of set pressure, valve manufacturer, and a time-related aging effect. This paper attempts to answer two questions: (1) what is the predicted failure rate over the chosen maintenance/ inspection interval; and do we understand aging sufficient enough to estimate risk when basing proof test intervals on proof test results?

  10. Radioactivity level of soil around Baqiao coal-fired power plant in China

    International Nuclear Information System (INIS)

    Lu, Xinwei; Zhao, Caifeng; Chen, Cancan; Liu, Wen

    2012-01-01

    Natural radioactivity level of soil around Baqiao coal-fired power plant in China was determined using gamma ray spectrometry. The concentrations of 226 Ra, 232 Th and 40 K in the studied soil samples range from 27.6 to 48.8, 44.4 to 61.4 and 640.2 to 992.2 Bq kg −1 with an average of 36.1, 51.1 and 733.9 Bq kg −1 , respectively, which are slightly higher than the average values of Shaanxi soil. The radium equivalent activity, the air absorbed dose rate and the annual effective dose rate were calculated and compared with the internationally reported or reference values. The radium equivalent activities of the studied samples are below the internationally accepted values. The air absorbed dose rate and the annual effective dose rate received by the local residents due to the natural radionuclides in soil are slightly higher than the mean value of Xi'an and worldwide. - Highlights: ► Natural radioactivity in soil around the coal-fired power plant was determined. ► Radiological parameters were used to assess radiation hazard. ► The coal-fired power plant has affected the local radioactivity level.

  11. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  12. The plant-specific impact of different pressurization rates in the probabilistic estimation of containment failure modes

    International Nuclear Information System (INIS)

    Ahn, Kwang Il; Yang, Joon Eon; Ha, Jae Joo

    2003-01-01

    The explicit consideration of different pressurization rates in estimating the probabilities of containment failure modes has a profound effect on the confidence of containment performance evaluation that is so critical for risk assessment of nuclear power plants. Except for the sophisticated NUREG-1150 study, many of the recent containment performance analyses (through level 2 PSAs or IPE back-end analyses) did not take into account an explicit distinction between slow and fast pressurization in their analyses. A careful investigation of both approaches shows that many of the approaches adopted in the recent containment performance analyses exactly correspond to the NUREG-1150 approach for the prediction of containment failure mode probabilities in the presence of fast pressurization. As a result, it was expected that the existing containment performance analysis results would be subjected to greater or less conservatism in light of the ultimate failure mode of the containment. The main purpose of this paper is to assess potential conservatism of a plant-specific containment performance analysis result in light of containment failure mode probabilities

  13. Overheating failure of superheater suspension tubes of a captive thermal power plant boiler

    International Nuclear Information System (INIS)

    Bhattacharya, Sova; Amir, Q.M.; Kannan, C.; Mahapatra, S.B.

    2000-01-01

    Failure of boiler tubes is the foremost cause of forced boiler outages. One of the predominant failure mechanism of boiler tubes is the stress rupture failure in the form of either short term overheating or long term overheating which are normally encountered in superheater and reheater sections working in the creep range. The strength of the boiler tube depends on the stress level as well on the temperature of exposure in the creep range. An increase in either can reduce the time to rupture. Time at the exposure temperature is an important factor based on which the failures are categorised as either short term or long term. Though there is no established time duration criteria demarcating the short or long term stress rupture failures, depending on the various manifestations on the failed samples, one can categorise the failure. This paper addresses one such stress rupture failure in the superheater section of a captive thermal power plant of a refinery. Multiple failures on the suspension coil of a superheater section was investigated for the cause of failure. Laboratory investigation of the failed sample involved visual inspection, dimensional measurements, chemical analysis of internal deposits and microstructural study. On the basis of these, the failure was attributed to deposition of trisodium phosphate carried over by the feed water into the superheater section resulting in chokage and increase in local operating hoop stresses of the tube. The ultimate failure was thus categorised as long term overheating failure. (author)

  14. Performance modeling in critical engineering systems using RAM analysis

    International Nuclear Information System (INIS)

    Sharma, Rajiv Kumar; Kumar, Sunand

    2008-01-01

    Reliability, availability and maintainability (RAM) analysis of system is helpful in carrying out design modifications, if any, required to achieve minimum failures or to increase mean time between failures (MTBF) and thus to plan maintainability requirements, optimize reliability and maximize equipment availability. To this effect, the paper presents the application of RAM analysis in a process industry. Markovian approach is used to model the system behavior. For carrying out analysis, transition diagrams for various subsystems are drawn and differential equations associated with them are formulated. After obtaining the steady state solution the corresponding values of reliability and maintainability are estimated at different mission times. The computed results are presented to plant personnel for their active consideration. The results proved helpful to them for analyzing the system behavior and thereby to improve the system performance considerably by adopting and practicing suitable maintenance policies/strategies

  15. Combustion aerosols from co-firing of coal and solid recovered fuel in a 400 mw pf-fired power plant

    DEFF Research Database (Denmark)

    Pedersen, Anne Juul; Wu, Hao; Jappe Frandsen, Flemming

    2010-01-01

    In this work, combustion aerosols (i.e. fine particles fired power plant was sampled with a low-pressure impactor, and analysed by transmission and scanning electron microscopy. The power plant was operated at both dedicated coal combustion conditions...... and under conditions with cofiring of up to 10% (thermal basis) of solid recovered fuel (SRF). The SRFs were characterized by high contents of Cl, Ca, Na and trace metals, while the coal had relatively higher S, Al, Fe and K content. The mass-based particle size distribution of the aerosols was found...... to be bi-modal, with an ultrafine (vaporization) mode centered around 0.1 μm, and a coarser (finefragmentation) mode above 2 μm. Co-firing of SRF tended to increase the formation of ultrafine particles as compared with dedicated coal combustion, while the coarse mode tended to decrease. The increased...

  16. Investigation of valve failure problems in LWR power plants

    International Nuclear Information System (INIS)

    1980-04-01

    An analysis of component failures from information in the computerized Nuclear Safety Information Center (NSIC) data bank shows that for both PWR and BWR plants the component category most responsible for approximately 19.3% of light water reactor (LWR) power plant shutdowns. This investigation by Burns and Roe, Inc. shows that the greatest cause of shutdowns in LWRs due to valve failures is leakage from valve stem packing. Both BWR plants and PWR plants have stem leakage problems

  17. Asymptotic failure rate of a continuously monitored system

    International Nuclear Information System (INIS)

    Grall, A.; Dieulle, L.; Berenguer, C.; Roussignol, M.

    2006-01-01

    This paper deals with a perfectly continuously monitored system which gradually and stochastically deteriorates. The system is renewed by a delayed maintenance operation, which is triggered when the measured deterioration level exceeds an alarm threshold. A mathematical model is developed to study the asymptotic behavior of the reliability function. A procedure is proposed which allows us to identify the asymptotic failure rate of the maintained system. Numerical experiments illustrate the efficiency of the proposed procedure and emphasize the relevance of the asymptotic failure rate as an interesting indicator for the evaluation of the control-limit preventive replacement policy

  18. Asymptotic failure rate of a continuously monitored system

    Energy Technology Data Exchange (ETDEWEB)

    Grall, A. [Institut des Sciences et Technologies de l' Information de Troyes (CNRS-FRE 2732), Equipe de Modelisation et de Surete des Systemes, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes Cedex (France)]. E-mail: antoine.grall@utt.fr; Dieulle, L. [Institut des Sciences et Technologies de l' Information de Troyes (CNRS-FRE 2732), Equipe de Modelisation et de Surete des Systemes, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes Cedex (France)]. E-mail: laurence.dieulle@utt.fr; Berenguer, C. [Institut des Sciences et Technologies de l' Information de Troyes (CNRS-FRE 2732), Equipe de Modelisation et de Surete des Systemes, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes Cedex (France)]. E-mail: christophe.berenguer@utt.fr; Roussignol, M. [Laboratoire d' Analyse et de Mathematiques Appliquees, Universite de Marne la Vallee, 5 bd Descartes, Champs sur Marne, 77454 Marne la Vallee, Cedex 2 (France)]. E-mail: michel.roussignol@univ-mlv.fr

    2006-02-01

    This paper deals with a perfectly continuously monitored system which gradually and stochastically deteriorates. The system is renewed by a delayed maintenance operation, which is triggered when the measured deterioration level exceeds an alarm threshold. A mathematical model is developed to study the asymptotic behavior of the reliability function. A procedure is proposed which allows us to identify the asymptotic failure rate of the maintained system. Numerical experiments illustrate the efficiency of the proposed procedure and emphasize the relevance of the asymptotic failure rate as an interesting indicator for the evaluation of the control-limit preventive replacement policy.

  19. Leaching characteristics of trace elements in desulfurization gypsum from a coal-fired power plant

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Y.K.; Zhuo, Y.Q.; Zhu, Z.W.; Chen, C.H. [Tsinghua Univ., Beijing (China). Inst. of Thermal Engineering

    2013-07-01

    The contents and leaching characteristics of Cr, Cd, As, Pb and Se in FGD gypsum from a 200 MW coal-fired power plant were investigated in this study. Experimental results revealed that: the leaching characteristics of As and Se were similar, both leaching rates were not obviously affected by pH but increased with increase of the liquid-solid ratio. Pb and Cr had similar leaching characteristics, their leaching rates were closely related with the pH of leaching solution and increased with the lowering of pH and both increased with the increasing of solid-liquid ratio. Along with the increase of the liquid-solid ratio, the leaching gradually achieved balance, and the balanced liquid-solid ratio was bigger when pH of leaching solution was lower. Cd content of leaching solution was below detect limit, and thus failed to get its leaching characteristics. The order of trace element content in leaching solution is Pb < Cr < As < Se, and the order of leaching rates is Cr < As < Pb < Se. BCR extraction procedure revealed that trace elements in FGD gypsum were mainly existed as available fraction and migration ability was stronger than that of trace elements in fly ash from coal-fired power plants.

  20. Investigation of valve failure problems in LWR power plants

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-04-01

    An analysis of component failures from information in the computerized Nuclear Safety Information Center (NSIC) data bank shows that for both PWR and BWR plants the component category most responsible for approximately 19.3% of light water reactor (LWR) power plant shutdowns. This investigation by Burns and Roe, Inc. shows that the greatest cause of shutdowns in LWRs due to valve failures is leakage from valve stem packing. Both BWR plants and PWR plants have stem leakage problems (BWRs, 21% and PWRs, 34%).

  1. Control strategies of atmospheric mercury emissions from coal-fired power plants in China.

    Science.gov (United States)

    Tian, Hezhong; Wang, Yan; Cheng, Ke; Qu, Yiping; Hao, Jiming; Xue, Zhigang; Chai, Fahe

    2012-05-01

    Atmospheric mercury (Hg) emission from coal is one of the primary sources of anthropogenic discharge and pollution. China is one of the few countries in the world whose coal consumption constitutes about 70% of total primary energy, and over half of coals are burned directly for electricity generation. Atmospheric emissions of Hg and its speciation from coal-fired power plants are of great concern owing to their negative impacts on regional human health and ecosystem risks, as well as long-distance transport. In this paper, recent trends of atmospheric Hg emissions and its species split from coal-fired power plants in China during the period of 2000-2007 are evaluated, by integrating each plant's coal consumption and emission factors, which are classified by different subcategories of boilers, particulate matter (PM) and sulfur dioxide (SO2) control devices. Our results show that the total Hg emissions from coal-fired power plants have begun to decrease from the peak value of 139.19 t in 2005 to 134.55 t in 2007, though coal consumption growing steadily from 1213.8 to 1532.4 Mt, which can be mainly attributed to the co-benefit Hg reduction by electrostatic precipitators/fabric filters (ESPs/FFs) and wet flue gas desulfurization (WFGD), especially the sharp growth in installation of WFGD both in the new and existing power plants since 2005. In the coming 12th five-year-plan, more and more plants will be mandated to install De-NO(x) (nitrogen oxides) systems (mainly selective catalytic reduction [SCR] and selective noncatalytic reduction [SNCR]) for minimizing NO(x) emission, thus the specific Hg emission rate per ton of coal will decline further owing to the much higher co-benefit removal efficiency by the combination of SCR + ESPs/FFs + WFGD systems. Consequently, SCR + ESPs/FFs + WFGD configuration will be the main path to abate Hg discharge from coal-fired power plants in China in the near future. However advanced specific Hg removal technologies are necessary

  2. Corrosion protection pays off for coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, T.

    2006-11-15

    Zinc has long been used to hot-dip galvanise steel to deliver protection in harsh environments. Powder River Basin or eastern coal-fired plants benefit from using galvanized steel for conveyors, vibratory feeders, coal hoppers, chutes, etc. because maintenance costs are essentially eliminated. When life cycle costs for this process are compared to an alternative three-coal paint system for corrosion protection, the latter costs 5-10 times more than hot-dip galvanizing. An AEP Power Plant in San Juan, Puerto Rico and the McDuffie Coal Terminal in Mobile, AL, USA have both used hot-dip galvanized steel. 1 fig., 1 tab.

  3. Preventive maintenance-A countermeasure to plant aging

    International Nuclear Information System (INIS)

    Hlubek, W.

    1985-01-01

    The aging of power plants is caused by manifold and different influences. For instance, mechanical and thermal stress, radiation exposure, denting or wastage can considerably affect the aging of plant components and thus cause premature failures of components. In this presentation, the term 'Plant Aging' in nuclear power plants is to be understood more comprehensively than wear on components and material fatigue. In addition, nuclear power plants are to be adjusted to the advancing state of the science and technology (state-of-the-art) in order to guarantee safe operation at all times. The preventive maintenance - as a countermeasure to plant aging - comprises the systematic checks and servicing of the plant systems in operation and follows aging by inspection and tests. Experience with Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) preventive maintenance program at the Biblis NNP (1300 MW, PWR) is discussed. The concept of an 'Integrated Maintenance System' as a means to avoid 'Plant Aging' is presented

  4. Corrosion and Materials Performance in biomass fired and co-fired power plants

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Larsen, OH; Biede, O

    2003-01-01

    not previously encountered in coal-fired power plants. The type of corrosion attack can be directly ascribed to the composition of the deposit and the metal surface temperature. In woodchip boilers, a similar corrosion rate and corrosion mechanism has on some occasions been observed. Co-firing of straw (10...... and 20% energy basis) with coal has shown corrosion rates lower than those in straw-fired plants. With both 10 and 20% straw, no chlorine corrosion was seen. This paper will describe the results from in situ investigations undertaken in Denmark on high temperature corrosion in biomass fired plants....... Results from 100% straw-firing, woodchip and co-firing of straw with coal will be reported. The corrosion mechanisms observed are summarized and the corrosion rates for 18-8 type stainless steels are compared....

  5. Turbine-generators for 400 mw coal-fired power plants

    International Nuclear Information System (INIS)

    Engelke, W.; Bergmann, D.; Boer, J.; Termuehlen, H.

    1991-01-01

    This paper reports that presently, standard coal-fired power plant concepts including flue gas desulfurization (FGD) and DENO x systems are in the design stage to be built on relatively short delivery schedules. The rating in the 400 MW range has generally been selected, because such small power plant units with short delivery times cause a minimum financial burden during planning, delivery and installation. They also follow more closely the growth of electric energy demand at specific locations. However economical considerations could lead to larger unit ratings, since the planning and building process of higher capacity plants is not significantly different but specific plant costs are certainly smaller with increased unit size. Historically large tandem-compound steam turbine-generators have been built and have proven reliable operation with ratings in excess of 800 MW. Already in the late 1950's main steam pressures and temperatures as high as 4,500 psig and 1,200 degrees F respectively were successfully used for smaller steam turbines

  6. Superheater corrosion in biomass-fired power plants: Investigation of Welds

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Carlsen, B; Biede, O

    2002-01-01

    -fired Masnedø combined heat and power (CHP) plant to investigate corrosion at temperatures higher than that of the actual plant. The highest steam temperature investigated was 570°C. Various alloys of 12-22% chromium content were welded into this test loop. Their corrosion rates were similar and increased...... condense on superheater components. This gives rise to specific corrosion problems not previously encountered in coal-fired power plants. The type of corrosion attack can be directly ascribed to the composition of the deposit and the metal surface temperature. A test superheater was built into the straw...... with temperature. The mechanism of attack was grain boundary attack as a precursor to selective chromium depletion of the alloy. In addition welds coupling various tubes sections were also investigated. It was seen that there was preferential attack around those welds that had a high nickel content. The welds...

  7. Ozone Monitoring Instrument Observations of Interannual Increases in SO2 Emissions from Indian Coal-fired Power Plants During 2005-2012

    Science.gov (United States)

    Lu, Zifeng; Streets, David D.; de Foy, Benjamin; Krotkov, Nickolay A.

    2014-01-01

    Due to the rapid growth of electricity demand and the absence of regulations, sulfur dioxide (SO2) emissions from coal-fired power plants in India have increased notably in the past decade. In this study, we present the first interannual comparison of SO2 emissions and the satellite SO2 observations from the Ozone Monitoring Instrument (OMI) for Indian coal-fired power plants during the OMI era of 2005-2012. A detailed unit-based inventory is developed for the Indian coal-fired power sector, and results show that its SO2 emissions increased dramatically by 71 percent during 2005-2012. Using the oversampling technique, yearly high-resolution OMI maps for the whole domain of India are created, and they reveal a continuous increase in SO2 columns over India. Power plant regions with annual SO2 emissions greater than 50 Gg year-1 produce statistically significant OMI signals, and a high correlation (R equals 0.93) is found between SO2 emissions and OMI-observed SO2 burdens. Contrary to the decreasing trend of national mean SO2 concentrations reported by the Indian Government, both the total OMI-observed SO2 and average SO2 concentrations in coal-fired power plant regions increased by greater than 60 percent during 2005-2012, implying the air quality monitoring network needs to be optimized to reflect the true SO2 situation in India.

  8. FRAC (failure rate analysis code): a computer program for analysis of variance of failure rates. An application user's guide

    International Nuclear Information System (INIS)

    Martz, H.F.; Beckman, R.J.; McInteer, C.R.

    1982-03-01

    Probabilistic risk assessments (PRAs) require estimates of the failure rates of various components whose failure modes appear in the event and fault trees used to quantify accident sequences. Several reliability data bases have been designed for use in providing the necessary reliability data to be used in constructing these estimates. In the nuclear industry, the Nuclear Plant Reliability Data System (NPRDS) and the In-Plant Reliability Data System (IRPDS), among others, were designed for this purpose. An important characteristic of such data bases is the selection and identification of numerous factors used to classify each component that is reported and the subsequent failures of each component. However, the presence of such factors often complicates the analysis of reliability data in the sense that it is inappropriate to group (that is, pool) data for those combinations of factors that yield significantly different failure rate values. These types of data can be analyzed by analysis of variance. FRAC (Failure Rate Analysis Code) is a computer code that performs an analysis of variance of failure rates. In addition, FRAC provides failure rate estimates

  9. Analysis of radionuclides in airborne effluents from coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Rosner, G.; Chatterjee, B.; Hoetzl, H.; Winkler, R.

    1982-01-01

    In order to assess the level of radioactivity emitted by coal-fired power plants in detail, specific activities of several radionuclides have been measured in samples from a coal-fired and a brown coal-fired plant in the Federal Republic of Germany. Samples measured included coal, brown coal, bottom ash, collected fly ash from the various electrostatic precipitator stages and sieve fractions of collected fly ash as well as samples of escaping fly ash taken from the exhaust stream, all taken simultaneously on three operating days. Nuclides measured were U-238, U-234, Th-232, Th-230, Th-228, Ra-226, Pb-210, Po-210 and K-40. Methods applied included (i) direct gamma spectrometry, (ii) radiochemical separation with subsequent alpha spectrometry and (iii) direct alpha spectrometry. Methods are described and discussed. Finally, annual emission rates of airborne radionuclides are calculated for both plants.

  10. Analysis of radionuclides in airborne effluents from coal-fired power plants

    International Nuclear Information System (INIS)

    Rosner, G.; Chatterjee, B.; Hoetzl, H.; Winkler, R.

    1982-01-01

    In order to assess the level of radioactivity emitted by coal-fired power plants in detail, specific activities of several radionuclides have been measured in samples from a coal-fired and a brown coal-fired plant in the Federal Republic of Germany. Samples measured included coal, brown coal, bottom ash, collected fly ash from the various electrostatic precipitator stages and sieve fractions of collected fly ash as well as samples of escaping fly ash taken from the exhaust stream, all taken simultaneously on three operating days. Nuclides measured were U-238, U-234, Th-232, Th-230, Th-228, Ra-226, Pb-210, Po-210 and K-40. Methods applied included (i) direct gamma spectrometry, (ii) radiochemical separation with subsequent alpha spectrometry and (iii) direct alpha spectrometry. Methods are described and discussed. Finally, annual emission rates of airborne radionuclides are calculated for both plants. (orig.)

  11. Beyond reliability, multi-state failure analysis of satellite subsystems: A statistical approach

    International Nuclear Information System (INIS)

    Castet, Jean-Francois; Saleh, Joseph H.

    2010-01-01

    Reliability is widely recognized as a critical design attribute for space systems. In recent articles, we conducted nonparametric analyses and Weibull fits of satellite and satellite subsystems reliability for 1584 Earth-orbiting satellites launched between January 1990 and October 2008. In this paper, we extend our investigation of failures of satellites and satellite subsystems beyond the binary concept of reliability to the analysis of their anomalies and multi-state failures. In reliability analysis, the system or subsystem under study is considered to be either in an operational or failed state; multi-state failure analysis introduces 'degraded states' or partial failures, and thus provides more insights through finer resolution into the degradation behavior of an item and its progression towards complete failure. The database used for the statistical analysis in the present work identifies five states for each satellite subsystem: three degraded states, one fully operational state, and one failed state (complete failure). Because our dataset is right-censored, we calculate the nonparametric probability of transitioning between states for each satellite subsystem with the Kaplan-Meier estimator, and we derive confidence intervals for each probability of transitioning between states. We then conduct parametric Weibull fits of these probabilities using the Maximum Likelihood Estimation (MLE) approach. After validating the results, we compare the reliability versus multi-state failure analyses of three satellite subsystems: the thruster/fuel; the telemetry, tracking, and control (TTC); and the gyro/sensor/reaction wheel subsystems. The results are particularly revealing of the insights that can be gleaned from multi-state failure analysis and the deficiencies, or blind spots, of the traditional reliability analysis. In addition to the specific results provided here, which should prove particularly useful to the space industry, this work highlights the importance

  12. Evaluating the Thermal Pollution Caused by Wastewaters Discharged from a Chain of Coal-Fired Power Plants along a River

    Directory of Open Access Journals (Sweden)

    Marc A. Rosen

    2015-05-01

    Full Text Available Reliable and safe operation of a coal-fired power plant is strongly linked to freshwater resources, and environmental problems related to water sources and wastewater discharge are challenges for power station operation. In this study, an evaluation on the basis of a wastewater thermal pollution vector is reported for the environmental impact of residual water generated and discharged in the Jiu River during the operation of thermoelectric units of the Rovinari, Turceni and Craiova coal-fired power plants in Romania. Wastewater thermal pollutant vector Plane Projection is applied for assessing the water temperature evolution in the water flow lane created downstream of each power plant wastewater outlet channel. Simulation on the basis of an Electricity of France model, and testing validation of the results for thermoelectric units of 330 MW of these power plants are presented.

  13. Rate based failure detection

    Science.gov (United States)

    Johnson, Brett Emery Trabun; Gamage, Thoshitha Thanushka; Bakken, David Edward

    2018-01-02

    This disclosure describes, in part, a system management component and failure detection component for use in a power grid data network to identify anomalies within the network and systematically adjust the quality of service of data published by publishers and subscribed to by subscribers within the network. In one implementation, subscribers may identify a desired data rate, a minimum acceptable data rate, desired latency, minimum acceptable latency and a priority for each subscription. The failure detection component may identify an anomaly within the network and a source of the anomaly. Based on the identified anomaly, data rates and or data paths may be adjusted in real-time to ensure that the power grid data network does not become overloaded and/or fail.

  14. Statistical investigations of the failure behaviour of components in the AVR-experimental nuclear power plant. Vol. 1

    International Nuclear Information System (INIS)

    Hennings, W.

    1989-08-01

    From operational reports of the years 1970 to 1984, failure rates of valves in gas circuits of the AVR experimental power plant were determined. Also, potential influences of environmental and operational conditions were investigated. The resulting failure rates are for manual valves app. 0,1.10 -6 /h, for pneumatic valves between 3 and 9.10 -6 /h, for solenoid valves between 1,5 and 4.10 -6 /h and for control valves between 12 and 41.10 -6 /h. (orig.) [de

  15. Evaluation of NOX emissions from TVA coal-fired power plants

    International Nuclear Information System (INIS)

    Jones, J.W.; Stamey-Hall, S.

    1991-01-01

    The paper gives results of a preliminary evaluation of nitrogen oxide (NOx) emissions from 11 Tennessee Valley Authority (TVA) coal-fired power plants. Current EPA AP-42 emission factors for NOx from coal-fired utility boilers do not account for variations either in these emissions as a function of generating unit load, or in designs of boilers of the same general type, particularly wall-fired boilers. The TVA has compiled short-term NOx emissions data from 30 units at 11 TVA coal-fired plants. These units include cyclone, cell burner, single wall, opposed wall, single tangential, and twin tangential boiler firing designs. Tests were conducted on 29 of the 30 units at high load; 18 were also tested at reduced load. NOx emissions rates were calculated for each test and compared to the calculated rate for each boiler type using AP-42. Preliminary analysis indicates that: (1) TVA cyclone-fired units emit more NOx than estimated using AP-42; (2) TVA cell burner units emit considerably more NOx than estimated; (3) most TVA single-wall-fired units emit slightly more NOx than estimated; (4) most TVA single-furnace tangentially fired units emit less NOx than estimated at high load, but the same as (or more than) estimated at reduced load; and (5) most TVA twin-furnace tangentially fired units, at high load, emit slightly more NOx than estimated using AP-42

  16. Impacts of TMDLs on coal-fired power plants.

    Energy Technology Data Exchange (ETDEWEB)

    Veil, J. A.; Environmental Science Division

    2010-04-30

    The Clean Water Act (CWA) includes as one of its goals restoration and maintenance of the chemical, physical, and biological integrity of the Nation's waters. The CWA established various programs to accomplish that goal. Among the programs is a requirement for states to establish water quality standards that will allow protection of the designated uses assigned to each water body. Once those standards are set, state agencies must sample the water bodies to determine if water quality requirements are being met. For those water bodies that are not achieving the desired water quality, the state agencies are expected to develop total maximum daily loads (TMDLs) that outline the maximum amount of each pollutant that can be discharged to the water body and still maintain acceptable water quality. The total load is then allocated to the existing point and nonpoint sources, with some allocation held in reserve as a margin of safety. Many states have already developed and implemented TMDLs for individual water bodies or regional areas. New and revised TMDLs are anticipated, however, as federal and state regulators continue their examination of water quality across the United States and the need for new or revised standards. This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements its overall research effort by evaluating water issues that could impact power plants. One of the program missions of the DOE's NETL is to develop innovative environmental control technologies that will enable full use of the Nation's vast coal reserves, while at the same time allowing the current fleet of coal-fired power plants to comply with existing and emerging environmental regulations. Some of the parameters for which TMDLs are being developed are components in discharges

  17. Uncertainties and quantification of common cause failure rates and probabilities for system analyses

    International Nuclear Information System (INIS)

    Vaurio, Jussi K.

    2005-01-01

    Simultaneous failures of multiple components due to common causes at random times are modelled by constant multiple-failure rates. A procedure is described for quantification of common cause failure (CCF) basic event probabilities for system models using plant-specific and multiple-plant failure-event data. Methodology is presented for estimating CCF-rates from event data contaminated with assessment uncertainties. Generalised impact vectors determine the moments for the rates of individual systems or plants. These moments determine the effective numbers of events and observation times to be input to a Bayesian formalism to obtain plant-specific posterior CCF-rates. The rates are used to determine plant-specific common cause event probabilities for the basic events of explicit fault tree models depending on test intervals, test schedules and repair policies. Three methods are presented to determine these probabilities such that the correct time-average system unavailability can be obtained with single fault tree quantification. Recommended numerical values are given and examples illustrate different aspects of the methodology

  18. Study of the Radiological Impact of the Coal Fired Power Plants on the Environment. The As Pontes coal-fired Power Plant

    International Nuclear Information System (INIS)

    Cancio, D.; Robles, B.; Mora, J. C.

    2009-01-01

    As part of the Study carried out to determine the radiological impact of the four main Spanish coal-fired power plants, the Study on the As Pontes Coal-Fired Coal Power Plant was finalized. In the Report containing the study are included every measurement performed, as well as the modelling and evaluations carried out in order to assess the radiological impact. The general conclusion obtained is that under a radiological point of view, the impact of this installation on the public and the environment is very small. Also the radiological impact on the workers of the installation was assessed, obtaining too very small increases over the natural background. (Author) 61 refs.

  19. Investigation of component failure rates for pulsed versus steady state tokamak operation

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1992-07-01

    This report presents component failure rate data sources applicable to magnetic fusion systems, and defines multiplicative factors to adjust these data for specific use on magnetic fusion experiment designs. The multipliers address both long pulse and steady state tokamak operation. Thermal fatigue and radiation damage are among the leading reasons for large multiplier values in pulsed operation applications. Field failure rate values for graphite protective tiles are presented, and beryllium tile failure rates in laboratory testing are also given. All of these data can be used for reliability studies, safety analyses, design tradeoff studies, and risk assessments

  20. Application of nonhomogeneous Poisson process to reliability analysis of repairable systems of a nuclear power plant with rates of occurrence of failures time-dependent

    International Nuclear Information System (INIS)

    Saldanha, Pedro L.C.; Simone, Elaine A. de; Melo, Paulo Fernando F.F. e

    1996-01-01

    Aging is used to mean the continuous process which physical characteristics of a system, a structure or an equipment changes with time or use. Their effects are increases in failure probabilities of a system, a structure or an equipment, and their are calculated using time-dependent failure rate models. The purpose of this paper is to present an application of the nonhomogeneous Poisson process as a model to study rates of occurrence of failures when they are time-dependent. To this application, an analysis of reliability of service water pumps of a typical nuclear power plant is made, as long as the pumps are effectively repaired components. (author)

  1. Assessment of inhalation risk due to radioactivity released from coal-based thermal power plant

    International Nuclear Information System (INIS)

    Sahu, S.K.; Pandit, G.G.; Shukla, V.K.; Puranik, V.D.; Kushwaha, H.S.

    2006-01-01

    In India, the coal based thermal power plants have been the major source of power generation in the past and would continue for decades to come. As the coal contains naturally occurring primordial radionuclides the burning of pulverized coal to produce energy for generation of electricity in thermal power plants will result in the emission of a variety of natural radioactive elements into the environment in the vicinity of thermal power plants. In this paper we have used two different methods for characterization of uncertainty in inhalation risk to the general public around 10 Kms radius in the neighborhood of a coal-fired thermal power plant. (author)

  2. CEZ utility's coal-fired power plants: towards a higher environmental friendliness

    International Nuclear Information System (INIS)

    Kindl, V.; Spilkova, T.; Vanousek, I.; Stehlik, J.

    1996-01-01

    Environmental efforts of the major Czech utility, CEZ a.s., are aimed at reducing air pollution arising from electricity and heat generating facilities. There are 3 main kinds of activity in this respect: phasing out of coal fired power plants; technological provisions to reduce emissions of particulate matter, sulfur dioxide, and nitrogen oxides from those coal fired units that are to remain in operation after 1998; and completion of the Temelin nuclear power plant. In 1995, emissions of particulate matter, sulfur dioxide, nitrogen oxides, and carbon monoxide from CEZ's coal fired power plants were 19%, 79%, 59%, and 60%, respectively, with respect to the situation in 1992. The break-down of electricity generation by CEZ facilities (in GWh) was as follows in 1995: hydroelectric power plants 1673, nuclear power plants 12230, coal fired power plants without desulfurization equipment 30181, and coal fired power plants with desulfurization equipment 2277. Provisions implemented to improve the environmental friendliness of the individual CEZ's coal fired power plants are described in detail. (P.A.). 5 tabs., 1 fig

  3. Upgrading and efficiency improvement in coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-01

    Improving the efficiencies of the large number of older coal-fired power plants operating around the world would give major savings in CO2 emissions together with significant other benefits. This report begins with a summary of the ways efficiency can become degraded and of the means available to combat the decrease in performance. These include improvements to operating and maintenance practices and more major techniques that are available, including boiler and turbine retrofits. There is also an update on fuel drying developments as a route to higher efficiency in plants firing high moisture lignites. The largest chapter of the report contains a number of descriptions of case study improvement projects, to illustrate measures that have been applied, benefits that have been achieved and identify best practices, which are summarised. Major national and international upgrading programmes are described.

  4. Nuclear and coal-fired power plant capital costs 1978 -June 1981

    International Nuclear Information System (INIS)

    Harbour, R.T.

    1981-07-01

    This bibliography covers 16 papers dealing with the economics of power generation - mainly comparisons between the capital costs of nuclear and coal fired plants. Some of the papers additionally discuss fuel, operating and maintenance costs, and performance. (U.K.)

  5. Natural Radionuclides in Slag/Ash Pile from Coal-Fired Power Plant Plomin

    International Nuclear Information System (INIS)

    Barisic, D.; Lulic, S.; Marovic, G.; Sencar, J.

    2001-01-01

    Full text: The coal slag/ash pile contains about one million tons of different (bottom ash, filter ash, gypsum) waste material deposited in vicinity of Plomin coal-fired power plant. Activities of 40 K, 228 Ra, 226 Ra and 238 U in materials deposited on slag/ash pile as well as in used coals were occasionally measured during past more than two and half decades of Plomin coal-fired plant operation. The radionuclides content in deposited bottom and filter ash material are related with radionuclide activities and mineral matter fraction in coals used. Up to the middle of nineties, the majority of coal used was anthracite from Istrian local mines. In that period, deposited waste material was characterised with relatively high 226 Ra and 238 U activities while potassium and thorium content was very low. When Istrian coal has been completely substituted with imported coal, uranium series radionuclide concentrations in deposited waste materials decreased significantly. Meanwhile, potassium and thorium activities in slag/ash pile material increased. It seems that slag/ash pile material generated in the last several years of Plomin coal-fired power plant operation could be generally used in cement industry without any special restriction. (author)

  6. Using plasma-fuel systems at Eurasian coal-fired thermal power stations

    Science.gov (United States)

    Karpenko, E. I.; Karpenko, Yu. E.; Messerle, V. E.; Ustimenko, A. B.

    2009-06-01

    The development of plasma technology for igniting solid fuels at coal-fired thermal power stations in Russia, Kazakhstan, China, and other Eurasian countries is briefly reviewed. Basic layouts and technical and economic characteristics of plasma-fuel systems installed in different coal-fired boiles are considered together with some results from using these systems at coal-fired thermal power stations.

  7. McDonald Generalized Linear Failure Rate Distribution

    Directory of Open Access Journals (Sweden)

    Ibrahim Elbatal

    2014-10-01

    Full Text Available We introduce in this paper a new six-parameters generalized version of the generalized linear failure rate (GLFR distribution which is called McDonald Generalized Linear failure rate (McGLFR distribution. The new distribution is quite flexible and can be used effectively in modeling survival data and reliability problems. It can have a constant, decreasing, increasing, and upside down bathtub-and bathtub shaped failure rate function depending on its parameters. It includes some well-known lifetime distributions as special sub-models. Some structural properties of the new distribution are studied. Moreover we discuss maximum likelihood estimation of the unknown parameters of the new model.

  8. Natural radioactivity level in coal and ash collected from Baoji coal-fired power plant

    International Nuclear Information System (INIS)

    Jia Xiaodan; Lu Xinwei

    2006-01-01

    Specific activities of natural radionuclides 226 Ra, 232 Th and 40 K were assessed in coal (3 samples), fly ash (17 samples) and bottom ash (6 samples) collected from Baoji coal-fired power plant. This paper analyzed the characteristics of 226 Ra, 232 Th and 40 K contents in bottom ash and fly ash, and studied the concentration factors of these radionuclides in ash in relation to those in coal. The level of natural radionuclides 226 Ra, 232 Th and 40 K of coal collected from Baoji coal-fired power plant are in the range of radionuclides contents of Chinese coal. The natural radioactivity level of fly ash collected from Baoji coal-fired power plant is close to Beijing and Shanghai coal-fired power plants. The paper farther assessed the possibility of fly ash of Baoji coal-fired power plant used as building materials according to the state standard. The results show that there are 29% samples exceeding the state limit when fly ash used as building materials. So the usage of fly ash in building material should be controlled. (authors)

  9. Potential nanotechnology applications for reducing freshwater consumption at coal fired power plants : an early view.

    Energy Technology Data Exchange (ETDEWEB)

    Elcock, D. (Environmental Science Division)

    2010-09-17

    This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements the overall research effort of the Existing Plants Research Program by evaluating water issues that could impact power plants. A growing challenge to the economic production of electricity from coal-fired power plants is the demand for freshwater, particularly in light of the projected trends for increasing demands and decreasing supplies of freshwater. Nanotechnology uses the unique chemical, physical, and biological properties that are associated with materials at the nanoscale to create and use materials, devices, and systems with new functions and properties. It is possible that nanotechnology may open the door to a variety of potentially interesting ways to reduce freshwater consumption at power plants. This report provides an overview of how applications of nanotechnology could potentially help reduce freshwater use at coal-fired power plants. It was developed by (1) identifying areas within a coal-fired power plant's operations where freshwater use occurs and could possibly be reduced, (2) conducting a literature review to identify potential applications of nanotechnology for facilitating such reductions, and (3) collecting additional information on potential applications from researchers and companies to clarify or expand on information obtained from the literature. Opportunities, areas, and processes for reducing freshwater use in coal-fired power plants considered in this report include the use of nontraditional waters in process and cooling water systems, carbon capture alternatives, more efficient processes for removing sulfur dioxide and nitrogen oxides, coolants that have higher thermal conductivities than water alone, energy storage options, and a variety of plant inefficiencies, which

  10. Constructing a sustainable power sector in China: current and future emissions of coal-fired power plants from 2010 to 2030

    Science.gov (United States)

    Tong, D.; Zhang, Q.

    2017-12-01

    As the largest energy infrastructure in China, power sector consumed more coal than any other sector and threatened air quality and greenhouse gas (GHG) abatement target. In this work, we assessed the evolution of coal-fired power plants in China during 2010-2030 and the evolution of associated emissions for the same period by using a unit-based emission projection model which integrated the historical power plants information, turnover of the future power plant fleet, and the evolution of end-of-pipe control technologies. We found that, driven by the stringent environmental legislation, SO2, NOx, and PM2.5 emissions from China's coal-fired power plants decreased by 49%, 45%, and 24% respectively during 2010-2015, comparing to 14% increase of coal consumption and 15% increase in CO2 emissions. We estimated that under current national energy development planning, coal consumption and CO2 emissions from coal-fired power plants will continue to increase until 2030, in which against the China's Intended Nationally Determined Contributions (INDCs) targets. Early retirement of old and low-efficient power plants will cumulatively reduce 2.2 Pg CO2 emissions from the baseline scenario during 2016-2030, but still could not curb CO2 emissions from the peak before 2030. Owing to the implementation of "near zero" emission control policy, we projected that emissions of air pollutants will significantly decrease during the same period under all scenarios, indicating the decoupling trends of air pollutants and CO2 emissions. Although with limited direct emission reduction benefits, increasing operating hours of power plants could avoid 236 GW of new power plants construction, which could indirectly reduce emissions embodied in the construction activity. Our results identified a more sustainable pathway for China's coal-fired power plants, which could reduce air pollutant emissions, improve the energy efficiency, and slow down the construction of new units. However, continuous

  11. Failure rate of piping in hydrogen sulphide systems

    International Nuclear Information System (INIS)

    Hare, M.G.

    1993-08-01

    The objective of this study is to provide information about piping failures in hydrogen sulphide service that could be used to establish failures rates for piping in 'sour service'. Information obtained from the open literature, various petrochemical industries and the Bruce Heavy Water Plant (BHWP) was used to quantify the failure analysis data. On the basis of this background information, conclusions from the study and recommendations for measures that could reduce the frequency of failures for piping systems at heavy water plants are presented. In general, BHWP staff should continue carrying out their present integrity and leak detection programmes. The failure rate used in the safety studies for the BHWP appears to be based on the rupture statistics for pipelines carrying sweet natural gas. The failure rate should be based on the rupture rate for sour gas lines, adjusted for the unique conditions at Bruce

  12. 4. Nuclear power plant component failures

    International Nuclear Information System (INIS)

    1990-01-01

    Nuclear power plant component failures are dealt with in relation to reliability in nuclear power engineering. The topics treated include classification of failures, analysis of their causes and impacts, nuclear power plant failure data acquisition and processing, interdependent failures, and human factor reliability in nuclear power engineering. (P.A.). 8 figs., 7 tabs., 23 refs

  13. Natural radioactivity around the coal-fired power plant

    International Nuclear Information System (INIS)

    Kovac, J.; Bajlo, M.

    1996-01-01

    By far the greatest part of the radiation received by the worlds population comes from natural sources, in some situations the exposure to natural radiation sources is enhanced as a result of technological developments. Burning of coal is one source of enhanced radiation exposure to naturally occurring elements, particularly radium, thorium and uranium. Extensive investigations have been performed in the coal-fired power plant (CFPP) Plomin in Croatia, using an anthracite coal with a higher than usual uranium content and normal thorium content. A network of TL dosimeters (TLD), working levels (WL) measurements, air pollution monitoring and monitoring of waste pile were organized. Some of the measurements have been repeated, and the results have shown decreased contamination. (author)

  14. Availability analysis of subsea blowout preventer using Markov model considering demand rate

    Directory of Open Access Journals (Sweden)

    Sunghee Kim

    2014-12-01

    Full Text Available Availabilities of subsea Blowout Preventers (BOP in the Gulf of Mexico Outer Continental Shelf (GoM OCS is investigated using a Markov method. An updated β factor model by SINTEF is used for common-cause failures in multiple redundant systems. Coefficient values of failure rates for the Markov model are derived using the β factor model of the PDS (reliability of computer-based safety systems, Norwegian acronym method. The blind shear ram preventer system of the subsea BOP components considers a demand rate to reflect reality more. Markov models considering the demand rate for one or two components are introduced. Two data sets are compared at the GoM OCS. The results show that three or four pipe ram preventers give similar availabilities, but redundant blind shear ram preventers or annular preventers enhance the availability of the subsea BOP. Also control systems (PODs and connectors are contributable components to improve the availability of the subsea BOPs based on sensitivity analysis.

  15. Survey of radionuclide emissions from coal-fired power plants and examination of impacts from a proposed circulating fluidized bed boiler power plant

    International Nuclear Information System (INIS)

    Steiner, C.P.; Militana, L.M.; Harvey, K.A.; Kinsey, G.D.

    1995-01-01

    This paper presents the results of a literature survey that examined radionuclide emissions from coal-fired power plants. Literature references from both the US and foreign countries are presented. Emphasis is placed on references from the US because the radionuclide emissions from coal-fired power plants are related to radionuclide concentrations in the coal, which vary widely throughout the world. The radionuclides were identified and quantified for various existing power plants reported in the literature. Applicable radionuclide emissions criteria discovered in the literature search were then applied to a proposed circulating fluidized bed boiler power plant. Based upon the derived radionuclide emission rates applied to the proposed power plant, an air quality modeling analysis was performed. The estimated ambient concentrations were compared to the most relevant existing regulatory ambient levels for radionuclides

  16. The world behind electricity from coal. The dubious origin of coal for Dutch coal-fired power plants

    International Nuclear Information System (INIS)

    2008-01-01

    Five energy companies in the Netherlands want to build additional coal-fired power plants: Essent and Nuon, the German company RWE and E.ON and the Belgian company Electrabel. Coal-fired power plants emit 70 percent more CO2 than gas-fired power plants. Especially because of the threat to the climate Greenpeace believes that no more coal-fired power plants should be built. In this publication Greenpeace explores the pollution, the working conditions and human rights with regard to the exploitation of coal. That has been elaborated for the three countries from which Dutch energy companies import coal: South Africa, Colombia and Indonesia. In addition to information about the origin of coal also insight is given into the coal market (stocks and use), the enormous coal transport and the world trade [nl

  17. Acoustic emission analysis on tensile failure of steam-side oxide scales formed on T22 alloy superheater tubes

    Energy Technology Data Exchange (ETDEWEB)

    Huang, Jun-Lin; Zhou, Ke-Yi, E-mail: boiler@seu.edu.cn; Xu, Jian-Qun [Key Laboratory of Energy Thermal Conversion and Control of Ministry of Education, School of Energy and Environment, Southeast University, Nanjing 210096, Jiangsu Province (China); Wang, Xin-Meng; Tu, Yi-You [School of Materials Science and Engineering, Southeast University, Nanjing 210096, Jiangsu Province (China)

    2014-07-28

    Failure of steam-side oxide scales on boiler tubes can seriously influence the safety of coal-fired power plants. Uniaxial tensile tests employing acoustic emission (AE) monitoring were performed, in this work, to investigate the failure behavior of steam-side oxide scales on T22 alloy boiler superheater tubes. The characteristic frequency spectra of the captured AE signals were obtained by performing fast Fourier transform. Three distinct peak frequency bands, 100-170, 175-250, and 280-390 kHz, encountered in different testing stages were identified in the frequency spectra, which were confirmed to, respectively, correspond to substrate plastic deformation, oxide vertical cracking, and oxide spalling with the aid of scanning electronic microscopy observations, and can thus be used for distinguishing different oxide failure mechanisms. Finally, the critical cracking strain of the oxide scale and the interfacial shear strength of the oxide/substrate interface were estimated, which are the critical parameters urgently desired for modeling the failure behavior of steam-side oxide scales on boiler tubes of coal-fired power plants.

  18. Acoustic emission analysis on tensile failure of steam-side oxide scales formed on T22 alloy superheater tubes

    Science.gov (United States)

    Huang, Jun-Lin; Zhou, Ke-Yi; Wang, Xin-Meng; Tu, Yi-You; Xu, Jian-Qun

    2014-07-01

    Failure of steam-side oxide scales on boiler tubes can seriously influence the safety of coal-fired power plants. Uniaxial tensile tests employing acoustic emission (AE) monitoring were performed, in this work, to investigate the failure behavior of steam-side oxide scales on T22 alloy boiler superheater tubes. The characteristic frequency spectra of the captured AE signals were obtained by performing fast Fourier transform. Three distinct peak frequency bands, 100-170, 175-250, and 280-390 kHz, encountered in different testing stages were identified in the frequency spectra, which were confirmed to, respectively, correspond to substrate plastic deformation, oxide vertical cracking, and oxide spalling with the aid of scanning electronic microscopy observations, and can thus be used for distinguishing different oxide failure mechanisms. Finally, the critical cracking strain of the oxide scale and the interfacial shear strength of the oxide/substrate interface were estimated, which are the critical parameters urgently desired for modeling the failure behavior of steam-side oxide scales on boiler tubes of coal-fired power plants.

  19. Acoustic emission analysis on tensile failure of steam-side oxide scales formed on T22 alloy superheater tubes

    International Nuclear Information System (INIS)

    Huang, Jun-Lin; Zhou, Ke-Yi; Xu, Jian-Qun; Wang, Xin-Meng; Tu, Yi-You

    2014-01-01

    Failure of steam-side oxide scales on boiler tubes can seriously influence the safety of coal-fired power plants. Uniaxial tensile tests employing acoustic emission (AE) monitoring were performed, in this work, to investigate the failure behavior of steam-side oxide scales on T22 alloy boiler superheater tubes. The characteristic frequency spectra of the captured AE signals were obtained by performing fast Fourier transform. Three distinct peak frequency bands, 100-170, 175-250, and 280-390 kHz, encountered in different testing stages were identified in the frequency spectra, which were confirmed to, respectively, correspond to substrate plastic deformation, oxide vertical cracking, and oxide spalling with the aid of scanning electronic microscopy observations, and can thus be used for distinguishing different oxide failure mechanisms. Finally, the critical cracking strain of the oxide scale and the interfacial shear strength of the oxide/substrate interface were estimated, which are the critical parameters urgently desired for modeling the failure behavior of steam-side oxide scales on boiler tubes of coal-fired power plants.

  20. Efficiency and environmental impacts of electricity restructuring on coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Chan, H. Ron [Maryland Univ., College Park, MD (United States). Dept. of Economics; Fell, Harrison [Colorado School of Mines, Golden, CO (United States). Division of Economics and Business; Lange, Ian [Stirling Univ. (United Kingdom). Division of Economics; Li, Shanjun [Cornell Univ., Ithaca, NY (United States). Dyson School of Applied Economics and Management

    2013-03-15

    We investigate the impacts of electricity market restructuring on fuel efficiency, utilization and, new to this area, cost of coal purchases among coal-fired power plants using a panel data set from 1991 to 2005. Our study focuses exclusively on coal-fired power plants and uses panel data covering several years after implementation of restructuring. The estimation compares how investor-owned (IOs) plants in states with restructuring changed their behavior relative to IOs in states without. Our analysis finds that restructuring led to: (1) a two percent improvement in fuel efficiency for IOs, (2) a ten percent decrease in unit cost of heat input, and (3) a lower capacity factor even after adjusting for cross-plant generation re-allocation due to cost reductions. Based on these estimates, back-of-the-envelope calculations find that restructuring has led to about 6.5 million dollars in annual cost savings or nearly 12 percent of operating expenses and up to a 7.6 percent emissions reduction per plant.

  1. Environmental impacts of nuclear and coal-fired power plants

    International Nuclear Information System (INIS)

    Horyna, J.; Horynova, H.

    1984-01-01

    The current situation in the development of nuclear power in the world and in Czechoslovakia is briefly outlined and the possibilities are discussed of alternative energy resources. The environmental impact is described of conventional power plants firing coal; sulphur and nitrogen oxides are mentioned and their environmental impacts shown. Their quantities and the quantities of other gaseous, liquid and soid wastes produced by coal power plants are given. Annual estimates are presented of radioactive material emissions; trace amount emissions of toxic metals and their ecological risks are shown. Concern over the increasing concentration of CO 2 in the atmosphere is voiced. For nuclear power plants, the amount of radionuclides in stack emission and of those released into water flows is tabulated. Their effect on the aqueous ecosystem is characterized as is thermal pollution of water flows and the environmental impact of cooling towers. Other factors are also mentioned, such as the increased industrial land use, the effect of high voltage transmission lines and aesthetic effects. The conclusion is arrived at that the construction of nuclear power plants will eliminate the adverse environmental impact of emissions while the other impacts of the two types of power plants are comparable. (A.K.)

  2. Ultra-Low Carbon Emissions from Coal-Fired Power Plants through Bio-Oil Co-Firing and Biochar Sequestration.

    Science.gov (United States)

    Dang, Qi; Mba Wright, Mark; Brown, Robert C

    2015-12-15

    This study investigates a novel strategy of reducing carbon emissions from coal-fired power plants through co-firing bio-oil and sequestering biochar in agricultural lands. The heavy end fraction of bio-oil recovered from corn stover fast pyrolysis is blended and co-fired with bituminous coal to form a bio-oil co-firing fuel (BCF). Life-cycle greenhouse gas (GHG) emissions per kWh electricity produced vary from 1.02 to 0.26 kg CO2-eq among different cases, with BCF heavy end fractions ranging from 10% to 60%, which corresponds to a GHG emissions reduction of 2.9% to 74.9% compared with that from traditional bituminous coal power plants. We found a heavy end fraction between 34.8% and 37.3% is required to meet the Clean Power Plan's emission regulation for new coal-fired power plants. The minimum electricity selling prices are predicted to increase from 8.8 to 14.9 cents/kWh, with heavy end fractions ranging from 30% to 60%. A minimum carbon price of $67.4 ± 13 per metric ton of CO2-eq was estimated to make BCF power commercially viable for the base case. These results suggest that BCF co-firing is an attractive pathway for clean power generation in existing power plants with a potential for significant reductions in carbon emissions.

  3. A quasi-independence model to estimate failure rates

    International Nuclear Information System (INIS)

    Colombo, A.G.

    1988-01-01

    The use of a quasi-independence model to estimate failure rates is investigated. Gate valves of nuclear plants are considered, and two qualitative covariates are taken into account: plant location and reactor system. Independence between the two covariates and an exponential failure model are assumed. The failure rate of the components of a given system and plant is assumed to be a constant, but it may vary from one system to another and from one plant to another. This leads to the analysis of a contingency table. A particular feature of the model is the different operating time of the components in the various cells which can also be equal to zero. The concept of independence of the covariates is then replaced by that of quasi-independence. The latter definition, however, is used in a broader sense than usual. Suitable statistical tests are discussed and a numerical example illustrates the use of the method. (author)

  4. ECONOMICS AND FEASIBILITY OF RANKINE CYCLE IMPROVEMENTS FOR COAL FIRED POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Richard E. Waryasz; Gregory N. Liljedahl

    2004-09-08

    ALSTOM Power Inc.'s Power Plant Laboratories (ALSTOM) has teamed with the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL), American Electric Company (AEP) and Parsons Energy and Chemical Group to conduct a comprehensive study evaluating coal fired steam power plants, known as Rankine Cycles, equipped with three different combustion systems: Pulverized Coal (PC), Circulating Fluidized Bed (CFB), and Circulating Moving Bed (CMB{trademark}). Five steam cycles utilizing a wide range of steam conditions were used with these combustion systems. The motivation for this study was to establish through engineering analysis, the most cost-effective performance potential available through improvement in the Rankine Cycle steam conditions and combustion systems while at the same time ensuring that the most stringent emission performance based on CURC (Coal Utilization Research Council) 2010 targets are met: > 98% sulfur removal; < 0.05 lbm/MM-Btu NO{sub x}; < 0.01 lbm/MM-Btu Particulate Matter; and > 90% Hg removal. The final report discusses the results of a coal fired steam power plant project, which is comprised of two parts. The main part of the study is the analysis of ten (10) Greenfield steam power plants employing three different coal combustion technologies: Pulverized Coal (PC), Circulating Fluidized Bed (CFB), and Circulating Moving Bed (CMB{trademark}) integrated with five different steam cycles. The study explores the technical feasibility, thermal performance, environmental performance, and economic viability of ten power plants that could be deployed currently, in the near, intermediate, and long-term time frame. For the five steam cycles, main steam temperatures vary from 1,000 F to 1,292 F and pressures from 2,400 psi to 5,075 psi. Reheat steam temperatures vary from 1,000 F to 1,328 F. The number of feedwater heaters varies from 7 to 9 and the associated feedwater temperature varies from 500 F to 626 F. The main part of the

  5. Using field feedback to estimate failure rates of safety-related systems

    International Nuclear Information System (INIS)

    Brissaud, Florent

    2017-01-01

    The IEC 61508 and IEC 61511 functional safety standards encourage the use of field feedback to estimate the failure rates of safety-related systems, which is preferred than generic data. In some cases (if “Route 2_H” is adopted for the 'hardware safety integrity constraints”), this is even a requirement. This paper presents how to estimate the failure rates from field feedback with confidence intervals, depending if the failures are detected on-line (called 'detected failures', e.g. by automatic diagnostic tests) or only revealed by proof tests (called 'undetected failures'). Examples show that for the same duration and number of failures observed, the estimated failure rates are basically higher for “undetected failures” because, in this case, the duration observed includes intervals of time where it is unknown that the elements have failed. This points out the need of using a proper approach for failure rates estimation, especially for failures that are not detected on-line. Then, this paper proposes an approach to use the estimated failure rates, with their uncertainties, for PFDavg and PFH assessment with upper confidence bounds, in accordance with IEC 61508 and IEC 61511 requirements. Examples finally show that the highest SIL that can be claimed for a safety function can be limited by the 90% upper confidence bound of PFDavg or PFH. The requirements of the IEC 61508 and IEC 61511 relating to the data collection and analysis should therefore be properly considered for the study of all safety-related systems. - Highlights: • This paper deals with requirements of the IEC 61508 and IEC 61511 for using field feedback to estimate failure rates of safety-related systems. • This paper presents how to estimate the failure rates from field feedback with confidence intervals for failures that are detected on-line. • This paper presents how to estimate the failure rates from field feedback with confidence intervals for failures that are only revealed by

  6. On rate-state and Coulomb failure models

    Science.gov (United States)

    Gomberg, J.; Beeler, N.; Blanpied, M.

    2000-01-01

    We examine the predictions of Coulomb failure stress and rate-state frictional models. We study the change in failure time (clock advance) Δt due to stress step perturbations (i.e., coseismic static stress increases) added to "background" stressing at a constant rate (i.e., tectonic loading) at time t0. The predictability of Δt implies a predictable change in seismicity rate r(t)/r0, testable using earthquake catalogs, where r0 is the constant rate resulting from tectonic stressing. Models of r(t)/r0, consistent with general properties of aftershock sequences, must predict an Omori law seismicity decay rate, a sequence duration that is less than a few percent of the mainshock cycle time and a return directly to the background rate. A Coulomb model requires that a fault remains locked during loading, that failure occur instantaneously, and that Δt is independent of t0. These characteristics imply an instantaneous infinite seismicity rate increase of zero duration. Numerical calculations of r(t)/r0 for different state evolution laws show that aftershocks occur on faults extremely close to failure at the mainshock origin time, that these faults must be "Coulomb-like," and that the slip evolution law can be precluded. Real aftershock population characteristics also may constrain rate-state constitutive parameters; a may be lower than laboratory values, the stiffness may be high, and/or normal stress may be lower than lithostatic. We also compare Coulomb and rate-state models theoretically. Rate-state model fault behavior becomes more Coulomb-like as constitutive parameter a decreases relative to parameter b. This is because the slip initially decelerates, representing an initial healing of fault contacts. The deceleration is more pronounced for smaller a, more closely simulating a locked fault. Even when the rate-state Δt has Coulomb characteristics, its magnitude may differ by some constant dependent on b. In this case, a rate-state model behaves like a modified

  7. Enginnering development of coal-fired high performance power systems phase II and III

    International Nuclear Information System (INIS)

    1998-01-01

    This report presents work carried out under contract DE-AC22-95PC95144 ''Engineering Development of Coal-Fired High Performance Systems Phase II and III.'' The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) that is capable of: thermal efficiency (HHV) >47%; NOx, SOx, and particulates 65% of heat input; all solid wastes benign; cost of electricity <90% of present plants. Phase I, which began in 1992, focused on the analysis of various configurations of indirectly fired cycles and on technical assessments of alternative plant subsystems and components, including performance requirements, developmental status, design options, complexity and reliability, and capital and operating costs. Phase I also included preliminary R ampersand D and the preparation of designs for HIPPS commercial plants approximately 300 MWe in size. This phase, Phase II, involves the development and testing of plant subsystems, refinement and updating of the HIPPS commercial plant design, and the site selection and engineering design of a HIPPS prototype plant. Work reported herein is from: Task 2.2 HITAF Air Heaters; Task 6 HIPPS Commercial Plant Design Update

  8. The best confidence interval of the failure rate and unavailability per demand when few experimental data are available

    International Nuclear Information System (INIS)

    Goodman, J.

    1985-01-01

    Using a few available data the likelihood functions for the failure rate and unavailability per demand are constructed. These likelihood functions are used to obtain likelihood density functions for the failure rate and unavailability per demand. The best (or shortest) confidence intervals for these functions are provided. The failure rate and unavailability per demand are important characteristics needed for reliability and availability analysis. The methods of estimation of these characteristics when plenty of observed data are available are well known. However, on many occasions when we deal with rare failure modes or with new equipment or components for which sufficient experience has not accumulated, we have scarce data where few or zero failures have occurred. In these cases, a technique which reflects exactly our state of knowledge is required. This technique is based on likelihood density function or Bayesian methods depending on the available prior distribution. To extract the maximum amount of information from the data the best confidence interval is determined

  9. BOILER MATERIALS FOR ULTRASUPERCRITICAL COAL POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    R. Viswanathan; K. Coleman; R.W. Swindeman; J. Sarver; J. Blough; W. Mohn; M. Borden; S. Goodstine; I. Perrin

    2003-10-20

    The principal objective of this project is to develop materials technology for use in ultrasupercritical (USC) plant boilers capable of operating with 760 C (1400 F), 35 MPa (5000 psi) steam. This project has established a government/industry consortium to undertake a five-year effort to evaluate and develop of advanced materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 760 C, will increase the efficiency of coal-fired boilers from an average of 35% efficiency (current domestic fleet) to 47% (HHV). This efficiency increase will enable coal-fired power plants to generate electricity at competitive rates (irrespective of fuel costs) while reducing CO{sub 2} and other fuel-related emissions by as much as 29%. Success in achieving these objectives will support a number of broader goals. First, from a national prospective, the program will identify advanced materials that will make it possible to maintain a cost-competitive, environmentally acceptable coal-based electric generation option. High sulfur coals will specifically benefit in this respect by having these advanced materials evaluated in high-sulfur coal firing conditions and from the significant reductions in waste generation inherent in the increased operational efficiency. Second, from a national prospective, the results of this program will enable domestic boiler manufacturers to successfully compete in world markets for building high-efficiency coal-fired power plants.

  10. Forecasting overhaul or replacement intervals based on estimated system failure intensity

    Science.gov (United States)

    Gannon, James M.

    1994-12-01

    System reliability can be expressed in terms of the pattern of failure events over time. Assuming a nonhomogeneous Poisson process and Weibull intensity function for complex repairable system failures, the degree of system deterioration can be approximated. Maximum likelihood estimators (MLE's) for the system Rate of Occurrence of Failure (ROCOF) function are presented. Evaluating the integral of the ROCOF over annual usage intervals yields the expected number of annual system failures. By associating a cost of failure with the expected number of failures, budget and program policy decisions can be made based on expected future maintenance costs. Monte Carlo simulation is used to estimate the range and the distribution of the net present value and internal rate of return of alternative cash flows based on the distributions of the cost inputs and confidence intervals of the MLE's.

  11. Engineering development of coal-fired high performance power systems, Phase II and III

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-04-01

    The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) that is capable of: thermal efficiency (HHV) {ge} 47%, NOx, SOx, and particulates {le} 10% NSPS (New Source Performance Standard) coal providing {ge} 65% of heat input, all solid wastes benign, and cost of electricity {le} 90% of present plants. Phase 1, which began in 1992, focused on the analysis of various configurations of indirectly fired cycles and on technical assessments of alternative plant subsystems and components, including performance requirements, developmental status, design options, complexity and reliability, and capital and operating costs. Phase 1 also included preliminary R and D and the preparation of designs for HIPPS commercial plants approximately 300 MWe in size. This phase, Phase 2, involves the development and testing of plant subsystems, refinement and updating of the HIPPS commercial plant design, and the site selection and engineering design of a HIPPS prototype plant. Work reported herein is from: Task 2.1 HITAC Combustors; Task 2.2 HITAF Air Heaters; Task 6 HIPPS Commercial Plant Design Update.

  12. Distributions of component failure rates, estimated from LER data

    International Nuclear Information System (INIS)

    Atwood, C.L.

    1985-01-01

    Past analyses of Licensee Event Report (LER) data have noted that component failure rates vary from plant to plant, and have estimated the distributions by two-parameter γ distributions. In this study, a more complicated distributional form is considered, a mixture of γs. This could arise if the plants' failure rates cluster into distinct groups. The method was applied to selected published LER data for diesel generators, pumps, valves, and instrumentation and control assemblies. The improved fits from using a mixture rather than a single γ distribution were minimal, and not statistically significant. There seem to be two possibilities: either explanatory variables affect the failure rates only in a gradual way, not a qualitative way; or, for estimating individual component failure rates, the published LER data have been analyzed to the limit of resolution

  13. Application of Machine Learning for Dragline Failure Prediction

    Directory of Open Access Journals (Sweden)

    Taghizadeh Amir

    2017-01-01

    Full Text Available Overburden stripping in open cast coal mines is extensively carried out by walking draglines. Draglines’ unavailability and unexpected failures result in delayed productions and increased maintenance and operating costs. Therefore, achieving high availability of draglines plays a crucial role for increasing economic feasibility of mining projects. Applications of methodologies which can forecast the failure type of dragline based on the available failure data not only help to reduce the maintenance and operating costs but also increase the availability and the production rate. In this study, Machine Learning approaches have been applied for data which has been gathered from an operating coal mine in Turkey. The study methodology consists of three algorithms as: i implementation of K-Nearest Neighbors, ii implementation of Multi-Layer Perceptron, and iii implementation of Radial Basis Function. The algorithms have been utilized for predicting the draglines’ failure types. In this sense, the input data, which are mean time-to-failure, and the output data, failure types, have been fed to the algorithms. The regression analysis of methodologies have been compared and showed the K- Nearest Neighbors has a higher rate of regression which is around 70 percent. Thus, the K-Nearest Neighbor algorithm can be applied in order to preventive components replacement which causes to minimized preventive and corrective cost parameters. The accurate prediction of failure type, indeed, causes to optimized number of inspections. The novelty of this study is application of machine learning approaches in draglines’ reliability subject for first time.

  14. Application of Coal Thermal Treatment Technology for Oil-Free Firing of Boilers

    Science.gov (United States)

    Aliyarov, B.; Mergalimova, A.; Zhalmagambetova, U.

    2018-04-01

    The theoretical and practical introduction of this kind of firing boiler units in coal thermal power plants is considered in the article. The results of an experimental study of three types of coals are presented in order to obtain the required gaseous fuel. The aim of the study is to develop a new, economically and ecologically more acceptable method for firing boilers at thermal power plants, which is able to exclude the use of expensive and inconvenient fuel oil. The tasks of the experiment are to develop a technological scheme of kindling of boilers at thermal power plants, using as a type of ignition fuel volatile combustible substances released during the heating of coal, and to investigate three types of coal for the suitability of obtaining gaseous fuels, in sufficient volume and with the required heat of combustion. The research methods include the analysis of technical and scientific-methodological literature on the problem of the present study, the study of the experience of scientists of other countries, the full-scale experiment on the production of volatile combustible substances. During the full-scale experiment, the coal of 3 fields of Kazakhstan has been studied: Shubarkul, Maikuben and Saryadyr. The analysis has been performed and the choice of the most convenient technology for boiler kindling and maintenance of steady burning of the torch has been made according to the proposed method, as well as the corresponding technological scheme has been developed. As a result of the experiment, it can be stated that from coal in the process of its heating (without access to oxygen), it is possible to obtain a sufficient amount of combustible volatile substances. The released gaseous fuel has the necessary parameters and is quite capable of replacing an expensive fuel oil. The resulting gaseous fuel is quite convenient to use and environmentally cleaner. The piloting scheme developed as a result of the experiment can be introduced in pulverized-coal

  15. Conceptual designs of pressurized fluidized bed and pulverized coal fired power plants

    International Nuclear Information System (INIS)

    Doss, H.S.; Bezella, W.A.; Hamm, J.R.; Pietruszkiewicz, J.

    1984-01-01

    This paper presents the major technical and economic characteristics of steam and air-cooled pressurized fluidized bed (PFB) power plant concepts, along with the characteristics of a pulverized coal fired power plant equipped with an adipic acid enhanced wet-limestone flue gas desulfurization system. Conceptual designs for the three plants were prepared to satisfy a set of common groundrules developed for the study. Grassroots plants, located on a generic plant site were assumed. The designs incorporate technologies projected to be commercial in the 1990 time frame. Power outputs, heat rates, and costs are presented

  16. Comprehensive evaluation of coal-fired power plants based on grey relational analysis and analytic hierarchy process

    International Nuclear Information System (INIS)

    Xu Gang; Yang Yongping; Lu Shiyuan; Li Le; Song Xiaona

    2011-01-01

    In China, coal-fired power plants are the main supplier of electricity, as well as the largest consumer of coal and water resources and the biggest emitter of SO x , NO x , and greenhouse gases (GHGs). Therefore, it is important to establish a scientific, reasonable, and feasible comprehensive evaluation system for coal-fired power plants to guide them in achieving multi-optimisation of their thermal, environmental, and economic performance. This paper proposes a novel comprehensive evaluation method, which is based on a combination of the grey relational analysis (GRA) and the analytic hierarchy process (AHP), to assess the multi-objective performance of power plants. Unlike the traditional evaluation method that uses coal consumption as a basic indicator, the proposed evaluation method also takes water consumption and pollutant emissions as indicators. On the basis of the proposed evaluation method, a case study on typical 600 MW coal-fired power plants is carried out to determine the relevancy rules among factors including the coal consumption, water consumption, pollutant, and GHG emissions of power plants. This research offers new ideas and methods for the comprehensive performance evaluation of complex energy utilisation systems, and is beneficial to the synthesised consideration of resources, economy, and environment factors in system optimising and policy making. - Research highlights: → We proposed a comprehensive evaluation method for coal-fired power plants. → The method is based on the grey relational analysis (GRA). → The method also introduces the idea of the analytic hierarchy process (AHP). → The method can assess thermal, economic and environmental performance. → The method can play an active role in guiding power plants' improvements.

  17. Comprehensive evaluation of coal-fired power plants based on grey relational analysis and analytic hierarchy process

    Energy Technology Data Exchange (ETDEWEB)

    Xu Gang, E-mail: xg2008@ncepu.edu.c [Key Lab of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education, School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing 102206 (China); Yang Yongping, E-mail: yyp@ncepu.edu.c [Key Lab of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education, School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing 102206 (China); Lu Shiyuan; Li Le [Key Lab of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education, School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing 102206 (China); Song Xiaona [Electromechanical Practice Center, Beijing Information Science and Technology University, Beijing (China)

    2011-05-15

    In China, coal-fired power plants are the main supplier of electricity, as well as the largest consumer of coal and water resources and the biggest emitter of SO{sub x}, NO{sub x}, and greenhouse gases (GHGs). Therefore, it is important to establish a scientific, reasonable, and feasible comprehensive evaluation system for coal-fired power plants to guide them in achieving multi-optimisation of their thermal, environmental, and economic performance. This paper proposes a novel comprehensive evaluation method, which is based on a combination of the grey relational analysis (GRA) and the analytic hierarchy process (AHP), to assess the multi-objective performance of power plants. Unlike the traditional evaluation method that uses coal consumption as a basic indicator, the proposed evaluation method also takes water consumption and pollutant emissions as indicators. On the basis of the proposed evaluation method, a case study on typical 600 MW coal-fired power plants is carried out to determine the relevancy rules among factors including the coal consumption, water consumption, pollutant, and GHG emissions of power plants. This research offers new ideas and methods for the comprehensive performance evaluation of complex energy utilisation systems, and is beneficial to the synthesised consideration of resources, economy, and environment factors in system optimising and policy making. - Research highlights: {yields} We proposed a comprehensive evaluation method for coal-fired power plants. {yields} The method is based on the grey relational analysis (GRA). {yields} The method also introduces the idea of the analytic hierarchy process (AHP). {yields} The method can assess thermal, economic and environmental performance. {yields} The method can play an active role in guiding power plants' improvements.

  18. Assessment on Startup Ramp Rate and Threshold Power of OPR1000

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kiyoung; Kim, Yongbae; Cha, Gyunho; Kim, Yongdeog [Korea Hydro and Nuclear Power Co., Ltd., Daejeon (Korea, Republic of)

    2014-05-15

    This paper summarizes PCI assessment according to several startup ramp rates and threshold power assessment of OPR1000. The definition of threshold power is maximum value in power range that can increase startup ramp rate rapidly. FALCON code is used for PCI assessment and it is analyzed for once-burned fuel because it is the most sensitive to PCI failure. The objective of the PCI analysis is to assess the cladding stress state under various power ramp conditions at the peak power node location. The PCI analyses were conducted for the once-burned fuel from the start of the second cycle to plant power 100%. This paper presents both the PCI analysis according to startup ramp rates and threshold power assessment result like below. · The more startup ramp rate is increased, the more PCI failure probability is decreased in low power range (≤ 40%). · PCI failure is not occurred even though startup ramp rate is 10%/hr until the plant power reaches 55%.

  19. Assessment on Startup Ramp Rate and Threshold Power of OPR1000

    International Nuclear Information System (INIS)

    Kim, Kiyoung; Kim, Yongbae; Cha, Gyunho; Kim, Yongdeog

    2014-01-01

    This paper summarizes PCI assessment according to several startup ramp rates and threshold power assessment of OPR1000. The definition of threshold power is maximum value in power range that can increase startup ramp rate rapidly. FALCON code is used for PCI assessment and it is analyzed for once-burned fuel because it is the most sensitive to PCI failure. The objective of the PCI analysis is to assess the cladding stress state under various power ramp conditions at the peak power node location. The PCI analyses were conducted for the once-burned fuel from the start of the second cycle to plant power 100%. This paper presents both the PCI analysis according to startup ramp rates and threshold power assessment result like below. · The more startup ramp rate is increased, the more PCI failure probability is decreased in low power range (≤ 40%). · PCI failure is not occurred even though startup ramp rate is 10%/hr until the plant power reaches 55%

  20. On preventive maintenance policy of a critical reliability level for system subject to degradation

    International Nuclear Information System (INIS)

    Zhao, Y.X.

    2003-01-01

    Conventional preventive maintenance (PM) policies generally hold same time interval for PM actions and are often applied with known failure modes. The same time interval will give unavoidably decreasing reliabilities at the PM actions for degradation system with imperfect PM effect and the known failure modes may be inaccurate in practice. Therefore, field managers would prefer policy with an acceptable reliability level to keep system often at a good state. A PM policy with the critical reliability level is presented to address the preference of field managers. Through assuming that system after a PM action starts a new failure process, a parameter so-called degradation ratio is introduced to represent the imperfect effect. The policy holds a law that there is same number of failures in the time intervals of various PM cycles, and same degradation ratio for the system reliability or benefit parameters such as the optimal time intervals and the hazard rates between the neighboring PM cycles. This law is valid to any of the failure modes that could be appropriately referred as a 'general isodegrading model', and the degradation ratio as a 'general isodegrading ratio'. In addition, life cycle availability and cost functions are derived for system with the policy. An analysis of the field data of a loading and unloading machine indicates that the reliability, availability and cost in life cycle might be well modeled by the present theory and approach

  1. Distributions of component failure rates estimated from LER data

    International Nuclear Information System (INIS)

    Atwood, C.L.

    1985-01-01

    Past analyses of Licensee Event Report (LER) data have noted that component failure rates vary from plant to plant, and have estimated the distributions by two-parameter gamma distributions. In this study, a more complicated distributional form is considered, a mixture of gammas. This could arise if the plants' failure rates cluster into distinct groups. The method was applied to selected published LER data for diesel generators, pumps, valves, and instrumentation and control assemblies. The improved fits from using a mixture rather than a single gamma distribution were minimal, and not statistically significant. There seem to be two possibilities: either explanatory variables affect the failure rates only in a gradual way, not a qualitative way; or, for estimating individual component failure rates, the published LER data have been analyzed to the limit of resolution. 9 refs

  2. Failure rate modeling using fault tree analysis and Bayesian network: DEMO pulsed operation turbine study case

    International Nuclear Information System (INIS)

    Dongiovanni, Danilo Nicola; Iesmantas, Tomas

    2016-01-01

    Highlights: • RAMI (Reliability, Availability, Maintainability and Inspectability) assessment of secondary heat transfer loop for a DEMO nuclear fusion plant. • Definition of a fault tree for a nuclear steam turbine operated in pulsed mode. • Turbine failure rate models update by mean of a Bayesian network reflecting the fault tree analysis in the considered scenario. • Sensitivity analysis on system availability performance. - Abstract: Availability will play an important role in the Demonstration Power Plant (DEMO) success from an economic and safety perspective. Availability performance is commonly assessed by Reliability Availability Maintainability Inspectability (RAMI) analysis, strongly relying on the accurate definition of system components failure modes (FM) and failure rates (FR). Little component experience is available in fusion application, therefore requiring the adaptation of literature FR to fusion plant operating conditions, which may differ in several aspects. As a possible solution to this problem, a new methodology to extrapolate/estimate components failure rate under different operating conditions is presented. The DEMO Balance of Plant nuclear steam turbine component operated in pulse mode is considered as study case. The methodology moves from the definition of a fault tree taking into account failure modes possibly enhanced by pulsed operation. The fault tree is then translated into a Bayesian network. A statistical model for the turbine system failure rate in terms of subcomponents’ FR is hence obtained, allowing for sensitivity analyses on the structured mixture of literature and unknown FR data for which plausible value intervals are investigated to assess their impact on the whole turbine system FR. Finally, the impact of resulting turbine system FR on plant availability is assessed exploiting a Reliability Block Diagram (RBD) model for a typical secondary cooling system implementing a Rankine cycle. Mean inherent availability

  3. Failure rate modeling using fault tree analysis and Bayesian network: DEMO pulsed operation turbine study case

    Energy Technology Data Exchange (ETDEWEB)

    Dongiovanni, Danilo Nicola, E-mail: danilo.dongiovanni@enea.it [ENEA, Nuclear Fusion and Safety Technologies Department, via Enrico Fermi 45, Frascati 00040 (Italy); Iesmantas, Tomas [LEI, Breslaujos str. 3 Kaunas (Lithuania)

    2016-11-01

    Highlights: • RAMI (Reliability, Availability, Maintainability and Inspectability) assessment of secondary heat transfer loop for a DEMO nuclear fusion plant. • Definition of a fault tree for a nuclear steam turbine operated in pulsed mode. • Turbine failure rate models update by mean of a Bayesian network reflecting the fault tree analysis in the considered scenario. • Sensitivity analysis on system availability performance. - Abstract: Availability will play an important role in the Demonstration Power Plant (DEMO) success from an economic and safety perspective. Availability performance is commonly assessed by Reliability Availability Maintainability Inspectability (RAMI) analysis, strongly relying on the accurate definition of system components failure modes (FM) and failure rates (FR). Little component experience is available in fusion application, therefore requiring the adaptation of literature FR to fusion plant operating conditions, which may differ in several aspects. As a possible solution to this problem, a new methodology to extrapolate/estimate components failure rate under different operating conditions is presented. The DEMO Balance of Plant nuclear steam turbine component operated in pulse mode is considered as study case. The methodology moves from the definition of a fault tree taking into account failure modes possibly enhanced by pulsed operation. The fault tree is then translated into a Bayesian network. A statistical model for the turbine system failure rate in terms of subcomponents’ FR is hence obtained, allowing for sensitivity analyses on the structured mixture of literature and unknown FR data for which plausible value intervals are investigated to assess their impact on the whole turbine system FR. Finally, the impact of resulting turbine system FR on plant availability is assessed exploiting a Reliability Block Diagram (RBD) model for a typical secondary cooling system implementing a Rankine cycle. Mean inherent availability

  4. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  5. Natural radionuclides in coal and waste material originating from coal fired power plant

    International Nuclear Information System (INIS)

    Marovic, Gordana; Franic, Zdenko; Sencar, Jasminka; Petrinec, Branko; Bituh, Tomislav; Kovac, Jadranka

    2008-01-01

    This paper presents long-term investigations of natural radioactivity in coal, used for power production in the coal-fired power plant (CFPP) situated on the Adriatic coast, and resulting slag and ash. Activity concentrations of 40 K, 232 Th, 226 Ra and 238 U in used coal and resulting waste material have been measured for 25 years. As expected, it was demonstrated that the content of radionuclides in deposited bottom and filter ash material are closely related with radionuclide activity concentrations and mineral matter fraction in used coals. The external hazard index has been calculated and discussed for the slag and ash depository. During the first decade of operation of the CFPP has been used domestic coal produced in nearby area characterized by higher background radiation compared with the rest of Croatia. Therefore, the coal itself had relatively high 226 Ra and 238 U activity concentrations while potassium and thorium content was very low, 40 K activity concentrations being 2-9% and those of 232 Th 1-3% of total activity. As, in addition, the sulphur concentrations in coal were very high use of domestic coal was gradually abandoned till it was completely substituted by imported coal originated from various sources and of low natural radioactivity. Upon this, activity concentrations of uranium series radionuclides in deposited waste materials decreased significantly. Consequently, waste material i.e., slag and ash, generated in the last several years of coal fired power plant operation could be readily used in cement industry and as additive to other building materials, without any special restrictions according to the Croatian regulations dealing with building materials and European directives. (author)

  6. Evaporation and crystallization of a droplet of desulfurization wastewater from a coal-fired power plant

    International Nuclear Information System (INIS)

    Liang, Zhengxing; Zhang, Li; Yang, Zhongqing; Qiang, Tang; Pu, Ge; Ran, Jingyu

    2017-01-01

    Highlights: • Evaporation and crystallization characteristics of the droplets of desulfurization wastewater. • TGA and DSC methods were used to investigate the evaporation and crystallization processes. • Evaporation and crystallization rates increase with the increase of temperature increasing rate. • Increasing volume of the droplet increases the evaporation rate, but decreases the crystallization rate. • Structure of the crystals changes significantly when the temperature increasing rate and the volume of the droplet change. - Abstract: Relationship between evaporation and crystallization characteristics of a droplet of desulfurization wastewater from a coal-fired power plant and some operating conditions was studied experimentally using a thermogravimetric analyzer (TGA) with differential scanning calorimetry (DSC) function and a scanning electron microscope (SEM). The results shows that, between 15 °C/min and 45 °C/min, a higher temperature increasing rate leads to higher evaporation and crystallization rates. The increment in the evaporation rate, caused by the same increment of temperature increasing rate, is larger, when the temperature increasing rate is lower. In addition, the final temperatures, ranging from 90 °C to 150 °C, have little impact on the evaporation and crystallization rates of the 0.5 μL droplet. Ultimately, for the droplets, ranging from 0.2 μL to 2.5 μL, evaporation rate increases with increasing volumes of the droplets, but the crystallization rate decreases. From the SEM results, it can be observed that the quantity of cracks on the surface of the crystals also declines with the increase in volumes. Furthermore, the Stefan flow becomes a significant and unneglectable factor in order to decrease the evaporation rate at the end of the evaporation period.

  7. Value of forestation in absorbing carbon dioxide surrounding a coal fired power plant

    Energy Technology Data Exchange (ETDEWEB)

    Dang, V.D.; Steinberg, M.

    1980-08-01

    The dispersion of carbon dioxide emitted from 1000 MW(e) coal fired power plant is investigated. Calculated ground level carbon dioxide concentrations as a function of distance from the power plant stack is validated by the results derived from sulfur dioxide dispersion measurements. Forestation is examined as a means for removal and control of atmospheric carbon dioxide at a distance of 5 to 10 km away from the power plant stack. An equilibrium and a dynamic approach are considered. For an average temperate zone forest growth rate (7.42 mg/dm/sup 2/ h), the overall reduction in forested land area required to remove the equivalent of all of the CO/sub 2/ from a 1000 MW(e) power plant would be less than 3.3% compared to removing the equivalent amount of CO/sub 2/ by planting forests remotely from the plant. If faster growing tropical plants or trees having up to 4 times the temperate plant growth rate were used, there would be a maximum savings of 15% in forested land area compared to a remote planting. This magnitude of reduction in cultivated forest area is insufficient to recommend planting forested areas adjacent to central power stations as a means of controlling CO/sub 2/ emission. Rather it is suggested to provide sufficient increased regional forested areas on a global scale for the purposes of absorbing the equivalent increase in CO/sub 2/ emission due to increased fossil fuel use.

  8. Evaluation methods of solar contribution in solar aided coal-fired power generation system

    International Nuclear Information System (INIS)

    Zhu, Yong; Zhai, Rongrong; Zhao, Miaomiao; Yang, Yongping; Yan, Qin

    2015-01-01

    Highlights: • Five methods for evaluating solar contribution are analyzed. • Method based on the second law of thermodynamics and thermal economics is more suitable for SACPGS. • Providing reliable reference for the formulation of feed-in tariff policies in China. - Abstract: Solar aided coal-fired power plants utilize solar thermal energy to couple with coal-fired power plants of various types by adopting characteristics of different thermal needs of plants. In this way, the costly thermal storage system and power generating system will become unnecessary, meanwhile the intermittent and unsteady nature of power generation can be avoided. In addition, large-scale utilization of solar thermal power and energy saving can be achieved. With the ever-deepening analyses of solar aided coal-fired power plants, the contribution evaluating system of solar thermal power is worth further exploration. In this paper, five common evaluation methods of solar contribution are analyzed, and solar aided coal-fired power plants of 1000 MW, 600 MW and 330 MW are studied with these five methods in a comparative manner. Therefore, this study can serve as a theoretical reference for future research of evaluation methods and subsidies for new energy

  9. Determining the reliability function of the thermal power system in power plant "Nikola Tesla, Block B1"

    Directory of Open Access Journals (Sweden)

    Kalaba Dragan V.

    2015-01-01

    Full Text Available Representation of probabilistic technique for evaluation of thermal power system reliability is the main subject of this paper. The system of thermal power plant under study consists of three subsystems and the reliability assessment is based on a sixteen-year failure database. By applying the mathematical theory of reliability to exploitation research data and using complex two-parameter Weibull distribution, the theoretical reliability functions of specified system have been determined. Obtained probabilistic laws of failure occurrence have confirmed a hypothesis that the distribution of the observed random variable fully describes behaviour of such a system in terms of reliability. Shown results make possible to acquire a better knowledge of current state of the system, as well as a more accurate estimation of its behavior during future exploitation. Final benefit is opportunity for potential improvement of complex system maintenance policies aimed at the reduction of unexpected failure occurrences.

  10. LOCAL IMPACTS OF MERCURY EMISSIONS FROM COAL FIRED POWER PLANTS.

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN, T.M.; BOWERMAN, B.; ADAMS, J.; LIPFERT, D.D.; MORRIS, S.M.; BANDO, A.; ET AL.

    2004-03-30

    A thorough quantitative understanding of the processes of mercury emissions, deposition, and translocation through the food chain is currently not available. Complex atmospheric chemistry and dispersion models are required to predict concentration and deposition contributions, and aquatic process models are required to predict effects on fish. There are uncertainties in all of these predictions. Therefore, the most reliable method of understanding impacts of coal-fired power plants on Hg deposition is from empirical data. A review of the literature on mercury deposition around sources including coal-fired power plants found studies covering local mercury concentrations in soil, vegetation, and animals (fish and cows (Lopez et al. 2003)). There is strong evidence of enhanced local deposition within 3 km of the chlor-alkali plants, with elevated soil concentrations and estimated deposition rates of 10 times background. For coal-fired power plants, the data show that atmospheric deposition of Hg may be slightly enhanced. On the scale of a few km, modeling suggests that wet deposition may be increased by a factor of two or three over background. The measured data suggest lower increases of 15% or less. The effects of coal-fired plants seem to be less than 10% of total deposition on a national scale, based on emissions and global modeling. The following summarizes our findings from published reports on the impacts of local deposition. In terms of excesses over background the following increments have been observed within a few km of the plant: (1) local soil concentration Hg increments of 30%-60%, (2) sediment increments of 18-30%, (3) wet deposition increments of 11-12%, and (4) fish Hg increments of about 5-6%, based on an empirical finding that fish concentrations are proportional to the square root of deposition. Important uncertainties include possible reductions of RGM to Hg(0) in power plant plumes and the role of water chemistry in the relationship between Hg

  11. Transport of the radionuclides and doses for some coal fired power plants

    International Nuclear Information System (INIS)

    Antic, D.; Telenta, B.; Sokcic-Kostic, M.

    1994-01-01

    The radiation exposure of the public in the vicinity of the selected coal fired power plants near from Belgrade has been studied. The contents of natural radionuclides according to experimental data have been used and dose rates from inhalation have been calculated using a two dimensional version of the cloud model. (author)

  12. Efficiency improvement of thermal coal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hourfar, D. [VEBA Kraftwerke Ruhr Ag, Gelsenkirchen (Germany)

    1996-12-31

    The discussion concerning an increase of the natural greenhouse effect by anthropogenic changes in the composition of the atmosphere has increased over the past years. The greenhouse effect has become an issue of worldwide debate. Carbon dioxide is the most serious emission of the greenhouse gases. Fossil-fired power plants have in the recent past been responsible for almost 30 % of the total CO{sub 2} emissions in Germany. Against this background the paper will describe the present development of CO{sub 2} emissions from power stations and present actual and future opportunities for CO{sub 2} reduction. The significance attached to hard coal as one of today`s prime sources of energy with the largest reserves worldwide, and, consequently, its importance for use in power generation, is certain to increase in the years to come. The further development of conventional power plant technology, therefore, is vital, and must be carried out on the basis of proven operational experience. The main incentive behind the development work completed so far has been, and continues to be, the achievement of cost reductions and environmental benefits in the generation of electricity by increasing plant efficiency, and this means that, in both the short and the long term, power plants with improved conventional technology will be used for environmentally acceptable coal-fired power generation.

  13. Subsequent flue gas desulfurization of coal-fired power plant units

    International Nuclear Information System (INIS)

    Willibal, U.; Braun, Gy.

    1998-01-01

    The presently operating coal-fired power plant in Hungary do not satisfy the pollution criteria prescribed by the European Union norms. The main polluting agent is the sulfur dioxide emitted by some of the power plants in Hungary in quantities over the limit standards. The power plant units that are in good operating state could be made competitive by using subsequent desulfurization measures. Various flue gas desulfurization technologies are presented through examples that can be applied to existing coal-fired power plants. (R.P.)

  14. The analysis of failure data in the presence of critical and degraded failures

    International Nuclear Information System (INIS)

    Haugen, Knut; Hokstad, Per; Sandtorv, Helge

    1997-01-01

    Reported failures are often classified into severityclasses, e.g., as critical or degraded. The critical failures correspond to loss of function(s) and are those of main concern. The rate of critical failures is usually estimated by the number of observed critical failures divided by the exposure time, thus ignoring the observed degraded failures. In the present paper failure data are analyzed, applying an alternative estimate for the critical failure rate, also taking the number of observed degraded failures into account. The model includes two alternative failure mechanisms, one being of the shock type, immediately leading to a critical failure, another resulting in a gradual deterioration, leading to a degraded failure before the critical failure occurs. Failure data on safety valves from the OREDA (Offshore REliability DAta) data base are analyzed using this model. The estimate for the critical failure rate is obtained and compared with the standard estimate

  15. Failure at Zainsk thermal power station: lesson for thermal and nuclear power stations

    International Nuclear Information System (INIS)

    Derkach, A.L.; Klyuchnikov, A.A.; Fedorenko, G.M.; Kuz'min, V.V.

    2007-01-01

    An account of system failure at Zainsk Thermal PS on January 1-st, 1979 is given. The cause of failure - sudden unauthorized energizing of block transformer which led to a direct asynchronous start of 200 MW turbine generator from grid. The failure resulted in the explosion and fire in generator, shaft destruction, and the damage of the machine hall's roof. The core roots of the failure have been scrutinised

  16. Coal-fired power plant: airborne routine discharges

    International Nuclear Information System (INIS)

    Zeevaert, T.

    2005-01-01

    The radiological impact from non-nuclear industries is a growing matter of concern to stake holders and regulators. It has been demonstrated that atmospheric discharges from coal-fired power plants can lead to higher dose-impacts to critical groups of the population than nuclear power plants. In Belgium, in the frame of an agreement between electricity producers and national authorities, measures were taken in conventional power plants to restrict airborne discharges of SO 2 , NO x and suspended particles. In the 500 MWe coal-fired power plant of Langerlo, a flue gas purification system was installed, consisting of a denitrification unit and a desulphurization unit, next to the electrostatic dust filter units. These measures have also an important effect on the radioactive atmospheric discharges. The objective of this study was to assess the radiological impact of the airborne releases of the power plant under normal working conditions and in particular the influence of the installation of the flue gas purification system. As a first step, we measured the natural radioactivity content of the coal and the radium content of the fly ash . The quantities of the other radioelements discharged through the chimney, were estimated, assuming the same behaviour as radium, except for the more volatile lead and polonium, which will condense preferably on finer ash particles, against which the electro filters are less effective. (A concentration factor of 4 has been adopted). The radon, present in the coal, is assumed to be discharged completely through the chimney. The atmospheric transport, dispersion and deposition of the discharged radionuclides were modelled, applying the bi-Gaussian plume model IFDM. For the calculations, we used hourly averages of the meteorological observations at Mol over the year 1991. The transfers of the radionuclides from air and soil to the biospheric media, exposing man, were calculated with our biosphere model and the radiological impact to the

  17. Analytical method for optimization of maintenance policy based on available system failure data

    International Nuclear Information System (INIS)

    Coria, V.H.; Maximov, S.; Rivas-Dávalos, F.; Melchor, C.L.; Guardado, J.L.

    2015-01-01

    An analytical optimization method for preventive maintenance (PM) policy with minimal repair at failure, periodic maintenance, and replacement is proposed for systems with historical failure time data influenced by a current PM policy. The method includes a new imperfect PM model based on Weibull distribution and incorporates the current maintenance interval T 0 and the optimal maintenance interval T to be found. The Weibull parameters are analytically estimated using maximum likelihood estimation. Based on this model, the optimal number of PM and the optimal maintenance interval for minimizing the expected cost over an infinite time horizon are also analytically determined. A number of examples are presented involving different failure time data and current maintenance intervals to analyze how the proposed analytical optimization method for periodic PM policy performances in response to changes in the distribution of the failure data and the current maintenance interval. - Highlights: • An analytical optimization method for preventive maintenance (PM) policy is proposed. • A new imperfect PM model is developed. • The Weibull parameters are analytically estimated using maximum likelihood. • The optimal maintenance interval and number of PM are also analytically determined. • The model is validated by several numerical examples

  18. Historical costs of coal-fired electricity and implications for the future

    International Nuclear Information System (INIS)

    McNerney, James; Doyne Farmer, J.; Trancik, Jessika E.

    2011-01-01

    We study the cost of coal-fired electricity in the United States between 1882 and 2006 by decomposing it in terms of the price of coal, transportation cost, energy density, thermal efficiency, plant construction cost, interest rate, capacity factor, and operations and maintenance cost. The dominant determinants of cost have been the price of coal and plant construction cost. The price of coal appears to fluctuate more or less randomly while the construction cost follows long-term trends, decreasing from 1902 to 1970, increasing from 1970 to 1990, and leveling off since then. Our analysis emphasizes the importance of using long time series and comparing electricity generation technologies using decomposed total costs, rather than costs of single components like capital. By taking this approach we find that the history of coal-fired electricity suggests there is a fluctuating floor to its future costs, which is determined by coal prices. Even if construction costs resumed a decreasing trend, the cost of coal-based electricity would drop for a while but eventually be determined by the price of coal, which fluctuates while showing no long-term trend. - Research highlights: → 125-year history highlights the dominant determinants of coal-fired electricity costs. → Results suggest a fluctuating floor to future costs, determined by coal prices. → Analysis emphasizes importance of comparing technologies using decomposed total costs.

  19. Effect of air ingress on the energy performance of coal fired thermal power plants

    International Nuclear Information System (INIS)

    Siddhartha Bhatt, M.

    2007-01-01

    Ingress of air in boilers leads to drops in energy efficiency. This paper presents the effects of air ingress in the combustion zone, post-combustion zone and air pre-heater (APH) on the energy efficiency and loading capacity of a coal fired thermal power plant operating on fuel with high ash (35-45%). The optimal O 2 in the flue gas for a pulverized coal fired system is 3.5% (corresponding to 20% excess air). The operating values are in the range of 4.2-6.0% in membrane type boilers and up to 10% in refractory type boilers (after sustained periods of operation). The leakage rate of boilers (up to the entrance of the APH) is designed at 0.2% while the average operating values are 7.25% for membrane type enclosures and 33.61% for refractory enclosures. The leakage rate of the APH is designed at 5.0% while the operating values range from 13.66% to 20.13% for rotary and tubular APHs. When the O 2 in the combustion zone varies from 3.5% to 8.0%, efficiency drops of 2.0% points are experienced in the boiler and turbine separately, and the gross overall efficiency drop is ∼3.0% points. The units do not experience any capacity drop up to an O 2 in the flue gas of 6.0% before the APH. At an O 2 in the flue gas (before APH) of 7.2%, a mild limitation on the unit capacity of around 2-3% is experienced. When O 2 in the flue gas (before APH) reaches a level of 9.0%, 20% capacity drop of the unit is experienced due to which the plant load cannot be raised higher than 80%. Beyond the level of 9.0% (rare occurrence), the unit is quite difficult to operate and has to be taken off for overhaul

  20. BOILER MATERIALS FOR ULTRASUPERCRITICAL COAL POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    R. Viswanathan; K. Coleman

    2003-01-20

    The principal objective of this project is to develop materials technology for use in ultrasupercritical (USC) plant boilers capable of operating with 760 C (1400 F), 35 MPa (5000 psi) steam. In the 21st century, the world faces the critical challenge of providing abundant, cheap electricity to meet the needs of a growing global population while at the same time preserving environmental values. Most studies of this issue conclude that a robust portfolio of generation technologies and fuels should be developed to assure that the United States will have adequate electricity supplies in a variety of possible future scenarios. The use of coal for electricity generation poses a unique set of challenges. On the one hand, coal is plentiful and available at low cost in much of the world, notably in the U.S., China, and India. Countries with large coal reserves will want to develop them to foster economic growth and energy security. On the other hand, traditional methods of coal combustion emit pollutants and CO{sub 2} at high levels relative to other generation options. Maintaining coal as a generation option in the 21st century will require methods for addressing these environmental issues. This project has established a government/industry consortium to undertake a five-year effort to evaluate and develop of advanced materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 760 C, will increase the efficiency of coal-fired boilers from an average of 35% efficiency (current domestic fleet) to 47% (HHV). This efficiency increase will enable coal-fired power plants to generate electricity at competitive rates (irrespective of fuel costs) while reducing CO{sub 2} and other fuel-related emissions by as much as 29%. Success in achieving these objectives will support a number of broader goals. First, from a national prospective, the program will identify advanced materials that will make it possible to

  1. Development of KSC program for investigating and generating field failure rates. Reliability handbook for ground support equipment

    Science.gov (United States)

    Bloomquist, C. E.; Kallmeyer, R. H.

    1972-01-01

    Field failure rates and confidence factors are presented for 88 identifiable components of the ground support equipment at the John F. Kennedy Space Center. For most of these, supplementary information regarding failure mode and cause is tabulated. Complete reliability assessments are included for three systems, eight subsystems, and nine generic piece-part classifications. Procedures for updating or augmenting the reliability results are also included.

  2. The Net Climate Impact of Coal-Fired Power Plant Emissions

    Science.gov (United States)

    Shindell, D.; Faluvegi, G.

    2010-01-01

    Coal-fired power plants influence climate via both the emission of long-lived carbon dioxide (CO2) and short-lived ozone and aerosol precursors. Using a climate model, we perform the first study of the spatial and temporal pattern of radiative forcing specifically for coal plant emissions. Without substantial pollution controls, we find that near-term net global mean climate forcing is negative due to the well-known aerosol masking of the effects of CO2. Imposition of pollution controls on sulfur dioxide and nitrogen oxides leads to a rapid realization of the full positive forcing from CO2, however. Long-term global mean forcing from stable (constant) emissions is positive regardless of pollution controls. Emissions from coal-fired power plants until 1970, including roughly 1/3 of total anthropogenic CO2 emissions, likely contributed little net global mean climate forcing during that period though they may have induce weak Northern Hemisphere mid-latitude (NHml) cooling. After that time many areas imposed pollution controls or switched to low sulfur coal. Hence forcing due to emissions from 1970 to 2000 and CO2 emitted previously was strongly positive and contributed to rapid global and especially NHml warming. Most recently, new construction in China and India has increased rapidly with minimal application of pollution controls. Continuation of this trend would add negative near-term global mean climate forcing but severely degrade air quality. Conversely, following the Western and Japanese pattern of imposing air quality pollution controls at a later time could accelerate future warming rates, especially at NHmls. More broadly, our results indicate that due to spatial and temporal inhomogeneities in forcing, climate impacts of multi-pollutant emissions can vary strongly from region to region and can include substantial effects on maximum rate-of-change, neither of which are captured by commonly used global metrics. The method we introduce here to estimate

  3. The economics of coal-fired power plants

    International Nuclear Information System (INIS)

    2008-10-01

    Coal-fired plants are the most polluting way to produce electricity due to their high CO2 emissions. But are they a good choice from an economic point of view? According to Greenpeace the answer is no: the price of coal is rising, construction costs are increasing and CO2 emissions will be priced. Nevertheless, E.On is developing plans for a new coal-fired plant at the Maasvlakte with the support of the Dutch government. [mk] [nl

  4. Waste generation comparison: Coal-fired versus nuclear power plants

    International Nuclear Information System (INIS)

    LaGuardia, T.S.

    1998-01-01

    Low-level radioactive waste generation and disposal attract a great deal of attention whenever the nuclear industry is scrutinized by concerned parties, be it the media, the public, or political interests. It is therefore important to the nuclear industry that this issue be put into perspective relative to other current forms of energy production. Most of the country's fossil-fueled power comes from coal-fired plants, with oil and gas as other fuel sources. Most of the generated waste also comes from coal plants. This paper, therefore, compares waste quantities generated by a typical (1150-MW(electric)) pressurized water reactor (PWR) to that of a comparably sized coal-fired power plant

  5. Energy economics of nuclear and coal fired power plant

    International Nuclear Information System (INIS)

    Lee, Kee Won; Cho, Joo Hyun; Kim, Sung Rae; Choi, Hae Yoon

    1995-01-01

    The upturn of Korean nuclear power program can be considered to have started in early 70's while future plants for the construction of new nuclear power plants virtually came to a halt in United States. It is projected that power plant systems from combination of nuclear and coal fired types might shift to all coal fired type, considering the current trend of construction on the new plants in the United States. However, with the depletion of natural resources, it is desirable to understand the utilization of two competitive utility technologies in terms of of invested energy. Presented in this paper is a comparison between two systems, nuclear power plant and coal fired steam power plant in terms of energy investment. The method of comparison is Net Energy Analysis (NEA). In doing so, Input-Output Analysis (IOA) among industries and commodities is done. Using these information, net energy ratios are calculated and compared. NEA is conducted for power plants in U.S. because the availability of necessary data are limited in Korea. Although NEA does not offer conclusive solution, this method can work as a screening process in decision making. When considering energy systems, results from such analysis can be used as a general guideline. 2 figs., 12 tabs., 5 refs. (Author)

  6. Failure analysis of fire resistant fluid (FRF piping used in hydraulic control system at oil-fired thermal power generation plant

    Directory of Open Access Journals (Sweden)

    Muhammad Akram

    2017-04-01

    Full Text Available This is a case study regarding frequent forced outages in an oil-fired power generating station due to failure of fire resistant fluid (FRF piping of material ASTM A-304. This analysis was done to find out the most probable cause of failure and to rectify the problem. Methods for finding and analyzing the cracks include nondestructive testing techniques such as visual testing (VT and dye penetrant testing (PT along with that periodic monitoring after rectification of problem. The study revealed that pitting and pit to crack transitions were formed in stainless steel piping containing high pressure (system pressure 115 bars fire resistant fluid. However, after replacement of piping the pitting and cracking reoccurred. It was observed that due to possible exposure to chlorinated moisture in surrounding environment pitting was formed which then transformed into cracks. The research work discussed in this paper illustrates the procedure used in detection of the problem and measures taken to solve the problem.

  7. Hazardous air pollutants emission from coal and oil-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Deepak Pudasainee; Jeong-Hun Kim; Sang-Hyeob Lee; Ju-Myon Park; Ha-Na Jang; Geum-Ju Song; Yong-Chil Seo [Yonsei University, Wonju (Republic of Korea). Department of Environmental Engineering

    2010-03-15

    Hazardous air pollutants (HAPs) emission characteristics from coal (anthracite, bituminous) and oil-fired power plants were studied in order to control pollutants by formulating US maximum achievable control technology (MACT)-like regulation in Korea. Sampling and analysis were carried out according to either Korean standard test method or US EPA method. Relatively lower levels of NOx and SOx were emitted from plants burning bituminous than the anthracite coal. Less dust was emitted from oil-fired power plants. Mercury, lead, and chromium were dominant in coal-fired power plants, following which, nickel and chromium were emitted from oil-fired power plants. The major volatile organic compounds (VOCs) emitted from coal-fired plants were 1,2-dichloroethane, benzene, carbon tetrachloride, chloroform, trichloro-ethylene. The emission of mercury and other heavy metals in flue gas was attributed to fuel types, operating conditions, residence time in the control devices and the type of air pollution control devices. After emission tests in the field and on analysis of the continuous emission monitoring data collected from facilities under operation and consideration of other various factors, management guidelines will be suggested with special reference to US MACT-like regulation.

  8. Analysis of natural radioactivity in Yatağan coalfired power plant in Turkey

    Directory of Open Access Journals (Sweden)

    Altıkulaç Aydan

    2017-01-01

    Full Text Available Use of the coal in order to generate electricity increases the exposure of people to radiation. In this paper, the activity concentrations of nuclides 226Ra, 232Th and 40K in samples of coal and bottom ash from the Yatagan Coal–Fired thermal power plant determined using gamma ray spectrometer with a NaI(Tl scintillation detector. The mean activity concentrations of 226Ra, 232Th, and 40K in the coal were found to be 37.2±2.8 Bqkg-1, 51.8±3.4 Bqkg-1 and 166.7±11.1 Bqkg-1, respectively. Whereas in the bottom ashes, the concentrations of the corresponding radionuclides were found to be 62.2±5.6 Bqkg-1, 87.4±5.9 Bqkg-1 and 221.0 ±12.5 Bqkg-1, respectively. The findings show that bottom ashes show higher activity concentrations of related radionuclide to coal samples. The absorbed gamma dose rate in outdoor air DROUT and annual effective dose rate (AED from coal were calculated to define radıologıcal rısk. The average findings of annual effective doses were detected as 68.6±5.1 μSvy-1 and 110.3±11.2 μSvy-1, respectively.

  9. Future CO2 emissions and electricity generation from proposed coal-fired power plants in India

    Science.gov (United States)

    Shearer, Christine; Fofrich, Robert; Davis, Steven J.

    2017-04-01

    With its growing population, industrializing economy, and large coal reserves, India represents a critical unknown in global projections of future CO2 emissions. Here, we assess proposed construction of coal-fired power plants in India and evaluate their implications for future emissions and energy production in the country. As of mid-2016, 243 gigawatts (GW) of coal-fired generating capacity are under development in India, including 65 GW under construction and an additional 178 GW proposed. These under-development plants would increase the coal capacity of India's power sector by 123% and, when combined with the country's goal to produce at least 40% of its power from non-fossil sources by 2030, exceed the country's projected future electricity demand. The current proposals for new coal-fired plants could therefore either "strand" fossil energy assets (i.e., force them to retire early or else operate at very low capacity factors) and/or ensure that the goal is not met by "locking-out" new, low-carbon energy infrastructure. Similarly, future emissions from the proposed coal plants would also exceed the country's climate commitment to reduce its 2005 emissions intensity 33% to 35% by 2030, which—when combined with the commitments of all other countries—is itself not yet ambitious enough to meet the international goal of holding warming well below 2°C relative to the pre-industrial era.

  10. Aging management and preventive maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    Bessho, Toichi; Sagawa, Wataru; Oyamada, Osamu; Uchida, Shunsuke

    1995-01-01

    It is expected that nuclear power generation will bear main electric power supply for long term. For this purpose, by applying proper preventive maintenance to the nuclear power plants in operation, the maintenance of high reliability and the rate of plant operation is extremely important. Especially it has been strongly demanded to execute efficiently the periodic inspection which is carried out every year to shorten its period and increase the rate of operation, and to maintain the reliability by the proper maintenance for the aged plants with long operation years. As to efficient and short periodic inspection, the preparation is advanced by the guidance of electric power companies aiming at realizing it in nearest fiscal year, and further, effort is exerted for the development of technology in long term to optimize periodic inspection. For securing the reliability of aged plants, it is important to do proper inspection and diagnosis and to take the countermeasures by repair and replacement, based on the grasp of secular change mechanism and the evaluation of life of machinery, equipment and materials. In particular, effort is exerted for the development of maintenance technology for reactor pressure vessels and in-core equipment which are hard to access. The confirmation of the function of remote operation equipment and the establishment of execution condition are carried out by uisng the full scale mock-up of BWR plant. The problems in maintenance service and the activities and results of reliability improvement are reported. (K.I.)

  11. Environmental radioactivity and radiation exposure by radioactive emissions of coal-fired power plants

    International Nuclear Information System (INIS)

    Jacobi, W.

    1981-03-01

    On the basis of measurements of the radioactive emissions of a 300 MW coal-fired power plant and of a 600 MW lignite-fired power plant the expected activity increase in air and soil in the environment of both plants is estimated and compared with the normal, natural activity level. Due to these emissions it results for the point of maximum immission a committed effective dose equivalent per GW x a of about 0.2 mrem = 0.002 mSv for the coal-fired plant and of about 0.04 mrem = 0.0004 mSv for the lignite-fired plant. This dose is caused to nearly equal parts by inhalation, ingestion and external γ-radiation. The normalized effective dose equivalent in the environment of the modern coal-fired power plant is in the same order of magnitude like that of a modern pressurized water reactor. The total, collective effective dose equivalent commitment by the annual radioactive emissions of coal-fired power plants in the F.R.Germany is estimated to 2000-6000 Man x rem = 20-60 Man x Sv. This corresponds to a mean per caput-dose in the population of the F.R.Germany of about 0.03-0.1 mrem = 0.0003-0.001 mSv; this is about 0.02-0.06% of the mean normal natural radiation exposure of the population. (orig.) [de

  12. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  13. Comparison of Tritium Component Failure Rate Data

    International Nuclear Information System (INIS)

    Lee C. Cadwallader

    2004-01-01

    Published failure rate values from the US Tritium Systems Test Assembly, the Japanese Tritium Process Laboratory, the German Tritium Laboratory Karlsruhe, and the Joint European Torus Active Gas Handling System have been compared. This comparison is on a limited set of components, but there is a good variety of data sets in the comparison. The data compared reasonably well. The most reasonable failure rate values are recommended for use on next generation tritium handling system components, such as those in the tritium plant systems for the International Thermonuclear Experimental Reactor and the tritium fuel systems of inertial fusion facilities, such as the US National Ignition Facility. These data and the comparison results are also shared with the International Energy Agency cooperative task on fusion component failure rate data

  14. Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Song, Gee Wook; Kim, Bum Shin; Choi, Woo Song; Park, Myung Soo [KEPCO Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (Pof) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RB I is to identify important failure modes and causes in the equipment. Once these are defined, the Pof and COF can be assessed for each failure. During Pof and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the Pof is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided.

  15. Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants

    International Nuclear Information System (INIS)

    Song, Gee Wook; Kim, Bum Shin; Choi, Woo Song; Park, Myung Soo

    2013-01-01

    Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (Pof) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RB I is to identify important failure modes and causes in the equipment. Once these are defined, the Pof and COF can be assessed for each failure. During Pof and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the Pof is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided

  16. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  17. Radionuclide emissions from a coal-fired power plant

    International Nuclear Information System (INIS)

    Amin, Y.M.; Uddin Khandaker, Mayeen; Shyen, A.K.S.; Mahat, R.H.; Nor, R.M.; Bradley, D.A.

    2013-01-01

    Current study concerns measurement of radioactivity levels in areas surrounding a 2420 MW thermal power plant fueled predominantly by bituminous coal. The concentrations of 226 Ra, 232 Th and 40 K in onsite bottom-ash were found to be 139 Bq/kg, 108 Bq/kg and 291 Bq/kg, respectively, the levels for these radiolnuclides in soil decreasing with distance from the power plant. At the plant perimeter the respective radionuclide concentrations were 87 Bq/kg, 74 Bq/kg and 297 Bq/kg. In a nearby town, the corresponding concentrations were 104 Bq/kg, 52 Bq/kg and 358 Bq/kg, suggestive of use of TENORM affected soils. The mean radium equivalent activities (Ra eq ) in soil and ash sample in the town were 205 Bq/kg and 316 Bq/kg, respectively. The Kapar plant ash/slag appears to contain a higher level of TENORM than the world average. The degree of contamination is much higher inside the town where slag has been mixed with topsoil as landfill or as simple domestic waste. For the prevailing levels of exposure and a worst case senario, the predicted committed effective dose due to ingestion and inhalation for intake durations of 1- and 30 years would be 4.2 μSv and 220 μSv, respectively. - Highlights: • Detailed studies on naturally occuring radionuclide emissions due to a 2420 MW coal-fired power plant in Malaysia. • Assessment of radiation exposures to the public around the power plant due to an intake of the radionuclides. • The Kapar plant ash/slag appears to contain a higher level of TENORM than the world average. • The degree of contamination is much higher inside the town where slag has been mixed with topsoil as landfill or as simple domestic waste

  18. Risk Analysis and Prediction of Floor Failure Mechanisms at Longwall Face in Parvadeh-I Coal Mine using Rock Engineering System (RES)

    Science.gov (United States)

    Aghababaei, Sajjad; Saeedi, Gholamreza; Jalalifar, Hossein

    2016-05-01

    The floor failure at longwall face decreases productivity and safety, increases operation costs, and causes other serious problems. In Parvadeh-I coal mine, the timber is used to prevent the puncture of powered support base into the floor. In this paper, a rock engineering system (RES)-based model is presented to evaluate the risk of floor failure mechanisms at the longwall face of E 2 and W 1 panels. The presented model is used to determine the most probable floor failure mechanism, effective factors, damaged regions and remedial actions. From the analyzed results, it is found that soft floor failure is dominant in the floor failure mechanism at Parvadeh-I coal mine. The average of vulnerability index (VI) for soft, buckling and compressive floor failure mechanisms was estimated equal to 52, 43 and 30 for both panels, respectively. By determining the critical VI for soft floor failure mechanism equal to 54, the percentage of regions with VIs beyond the critical VI in E 2 and W 1 panels is equal to 65.5 and 30, respectively. The percentage of damaged regions showed that the excess amount of used timber to prevent the puncture of weak floor below the powered support base is equal to 4,180,739 kg. RES outputs and analyzed results showed that setting and yielding load of powered supports, length of face, existent water at face, geometry of powered supports, changing the cutting pattern at longwall face and limiting the panels to damaged regions with supercritical VIs could be considered to control the soft floor failure in this mine. The results of this research could be used as a useful tool to identify the damaged regions prior to mining operation at longwall panel for the same conditions.

  19. Technologically enhanced natural radioactivity around the coal fired power plant

    International Nuclear Information System (INIS)

    Kovac, J.; Marovic, G.

    1997-01-01

    In some situations the exposure to natural radiation sources is enhanced as a result to technological developments. Burning of coal is one source of enhanced radiation exposure to naturally occurring elements, particularly radium, thorium and uranium. Most of the radioactive substances are concentrated in the ash and slag, which are heavy and drop to the bottom of a furnace. Lighter fly ash is carried up the chimney and into the atmosphere. The bottom ash and slag are usually deposited in a waste pile, from where some activity may leach into aquifers or be dispersed by wind.The main pathways through which the populations living around coal fired power plants are exposed to enhanced levels of natural radionuclides are inhalation and ingestion of the activity discharged into the Exosphere. For this reason, extensive investigations have been under way for several years in the coal fired power plant in Croatia, which uses an anthracite coal with a higher than usual uranium content. (authors)

  20. Optimal interval for major maintenance actions in electricity distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Louit, Darko; Pascual, Rodrigo [Centro de Mineria, Pontificia Universidad Catolica de Chile, Av. Vicuna MacKenna, 4860 Santiago (Chile); Banjevic, Dragan [Centre for Maintenance Optimization and Reliability Engineering, University of Toronto, 5 King' s College Rd., Toronto, Ontario (Canada)

    2009-09-15

    Many systems require the periodic undertaking of major (preventive) maintenance actions (MMAs) such as overhauls in mechanical equipment, reconditioning of train lines, resurfacing of roads, etc. In the long term, these actions contribute to achieving a lower rate of occurrence of failures, though in many cases they increase the intensity of the failure process shortly after performed, resulting in a non-monotonic trend for failure intensity. Also, in the special case of distributed assets such as communications and energy networks, pipelines, etc., it is likely that the maintenance action takes place sequentially over an extended period of time, implying that different sections of the network underwent the MMAs at different periods. This forces the development of a model based on a relative time scale (i.e. time since last major maintenance event) and the combination of data from different sections of a grid, under a normalization scheme. Additionally, extended maintenance times and sequential execution of the MMAs make it difficult to identify failures occurring before and after the preventive maintenance action. This results in the loss of important information for the characterization of the failure process. A simple model is introduced to determine the optimal MMA interval considering such restrictions. Furthermore, a case study illustrates the optimal tree trimming interval around an electricity distribution network. (author)

  1. Environmental impact of coal industry and thermal power plants in India.

    Science.gov (United States)

    Mishra, U C

    2004-01-01

    Coal is the only natural resource and fossil fuel available in abundance in India. Consequently, it is used widely as a thermal energy source and also as fuel for thermal power plants producing electricity. India has about 90,000 MW installed capacity for electricity generation, of which more than 70% is produced by coal-based thermal power plants. Hydro-electricity contributes about 25%, and the remaining is mostly from nuclear power plants (NPPs). The problems associated with the use of coal are low calorific value and very high ash content. The ash content is as high as 55-60%, with an average value of about 35-40%. Further, most of the coal is located in the eastern parts of the country and requires transportation over long distances, mostly by trains, which run on diesel. About 70% oil is imported and is a big drain on India's hard currency. In the foreseeable future, there is no other option likely to be available, as the nuclear power programme envisages installing 20,000 MWe by the year 2020, when it will still be around 5% of the installed capacity. Hence, attempts are being made to reduce the adverse environmental and ecological impact of coal-fired power plants. The installed electricity generating capacity has to increase very rapidly (at present around 8-10% per annum), as India has one of the lowest per capita electricity consumptions. Therefore, the problems for the future are formidable from ecological, radio-ecological and pollution viewpoints. A similar situation exists in many developing countries of the region, including the People's Republic of China, where coal is used extensively. The paper highlights some of these problems with the data generated in the author's laboratory and gives a brief description of the solutions being attempted. The extent of global warming in this century will be determined by how developing countries like India manage their energy generation plans. Some of the recommendations have been implemented for new plants

  2. Committed CO2 Emissions of China's Coal-fired Power Plants

    Science.gov (United States)

    Suqin, J.

    2016-12-01

    The extent of global warming is determined by the cumulative effects of CO2 in the atmosphere. Coal-fired power plants, the largest anthropogenic source of CO2 emissions, produce large amount of CO2 emissions during their lifetimes of operation (committed emissions), which thus influence the future carbon emission space under specific targets on mitigating climate change (e.g., the 2 degree warming limit relative to pre-industrial levels). Comprehensive understanding of committed CO2 emissions for coal-fired power generators is urgently needed in mitigating global climate change, especially in China, the largest global CO2emitter. We calculated China's committed CO2 emissions from coal-fired power generators installed during 1993-2013 and evaluated their impact on future emission spaces at the provincial level, by using local specific data on the newly installed capacities. The committed CO2 emissions are calculated as the product of the annual coal consumption from newly installed capacities, emission factors (CO2emissions per unit crude coal consumption) and expected lifetimes. The sensitivities about generators lifetimes and the drivers on provincial committed emissions are also analyzed. Our results show that these relatively recently installed coal-fired power generators will lead to 106 Gt of CO2 emissions over the course of their lifetimes, which is more than three times the global CO2 emissions from fossil fuels in 2010. More than 80% (85 Gt) of their total committed CO2 will be emitted after 2013, which are referred to as the remaining emissions. Due to the uncertainties of generators lifetime, these remaining emissions would increase by 45 Gt if the lifetimes of China's coal-fired power generators were prolonged by 15 years. Furthermore, the remaining emissions are very different among various provinces owing to local developments and policy disparities. Provinces with large amounts of secondary industry and abundant coal reserves have higher committed

  3. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  4. A new proposed approach for future large-scale de-carbonization coal-fired power plants

    International Nuclear Information System (INIS)

    Xu, Gang; Liang, Feifei; Wu, Ying; Yang, Yongping; Zhang, Kai; Liu, Wenyi

    2015-01-01

    The post-combustion CO 2 capture technology provides a feasible and promising method for large-scale CO 2 capture in coal-fired power plants. However, the large-scale CO 2 capture in conventionally designed coal-fired power plants is confronted with various problems, such as the selection of the steam extraction point and steam parameter mismatch. To resolve these problems, an improved design idea for the future coal-fired power plant with large-scale de-carbonization is proposed. A main characteristic of the proposed design is the adoption of a back-pressure steam turbine, which extracts the suitable steam for CO 2 capture and ensures the stability of the integrated system. A new let-down steam turbine generator is introduced to retrieve the surplus energy from the exhaust steam of the back-pressure steam turbine when CO 2 capture is cut off. Results show that the net plant efficiency of the improved design is 2.56% points higher than that of the conventional one when CO 2 capture ratio reaches 80%. Meanwhile, the net plant efficiency of the improved design maintains the same level to that of the conventional design when CO 2 capture is cut off. Finally, the match between the extracted steam and the heat demand of the reboiler is significantly increased, which solves the steam parameter mismatch problem. The techno-economic analysis indicates that the proposed design is a cost-effective approach for the large-scale CO 2 capture in coal-fired power plants. - Highlights: • Problems caused by CO 2 capture in the power plant are deeply analyzed. • An improved design idea for coal-fired power plants with CO 2 capture is proposed. • Thermodynamic, exergy and techno-economic analyses are quantitatively conducted. • Energy-saving effects are found in the proposed coal-fired power plant design idea

  5. How can the examination failure rate be stabilised?

    Science.gov (United States)

    Colberg, Anders Barli; Vatn, Daniel; Standal, Rune; Radtke, Maria; Slørdahl, Tobias S

    2017-10-31

    The study programme in medicine at the Norwegian University of Science and Technology (NTNU) holds written examinations once annually. The limit to achieving a pass grade is at least 65 % correct answers. The failure rate varies from one year to the next. Our hypothesis was that the variations in the failure rate were caused by a varying degree of difficulty in the examination questions. We investigated whether relative standard-setting methods would reduce the variation in the failure rate without lowering the average limit for a pass grade. Cohen’s relative standard-setting methods correct for the degree of difficulty in the examination questions. They are easy to apply and provide an alternative to setting an absolute limit of 65 % for a pass grade. We used data from 34 examinations for medical studies at the Norwegian University of Science and Technology (NTNU) from the period 2010–2015 and compared the failure rates estimated using the existing assessment method with those produced by Cohen’s methods. Using the existing 65 % limit for a pass grade, the failure rate varied from 0 % to 13.7 %, with a falling rate at later stages of the studies. With the exception of the examination held in the first year of study, the failure rate was lower and there was less variation in the failure rate with the original as well as the modified Cohen method when compared to the existing method. One of the Cohen methods resulted in a failure rate of 0 % to 10.4 % In our data material, an absolute limit of 65 % for a pass grade can be defended because the failure rate was generally low. Cohen’s methods could be an alternative in medical schools that have a high failure rate or where there are major variations in the failure rate from one year to the next in the same examination in the course of study.

  6. Applicability of the 'constructional fire prevention for industrial plants' to power plants

    International Nuclear Information System (INIS)

    Hammacher, P.

    1978-01-01

    Power plants, especially nuclear power plants, are considered because of their high value and large construction volume to be among the most important industrial constructions of our time. They have a very exposed position from the point of view of fire prevention because of their constructional and operational concept. The efforts in the Federal Republic of Germany to standardize laws and regulations for fire prevention in industrial plants (industrial construction code, DIN 18230) must be supported if only because they would simplify the licensing procedure. However these regulations cannot be applied in many cases and especially in the main buildings of thermal power plants without restricting or even endangering the function or the safety of such plants. At the present state of the art many parts of the power plant can surely be defined as 'fire safe'. Fire endangered plant components and rooms are protected according to their importance by different measures (constructional measures, fire-fighting equipments, extractors for flue gases and for heat, fire-brigade of the plant). (orig.) [de

  7. Integrating multi-objective optimization with computational fluid dynamics to optimize boiler combustion process of a coal fired power plant

    International Nuclear Information System (INIS)

    Liu, Xingrang; Bansal, R.C.

    2014-01-01

    Highlights: • A coal fired power plant boiler combustion process model based on real data. • We propose multi-objective optimization with CFD to optimize boiler combustion. • The proposed method uses software CORBA C++ and ANSYS Fluent 14.5 with AI. • It optimizes heat flux transfers and maintains temperature to avoid ash melt. - Abstract: The dominant role of electricity generation and environment consideration have placed strong requirements on coal fired power plants, requiring them to improve boiler combustion efficiency and decrease carbon emission. Although neural network based optimization strategies are often applied to improve the coal fired power plant boiler efficiency, they are limited by some combustion related problems such as slagging. Slagging can seriously influence heat transfer rate and decrease the boiler efficiency. In addition, it is difficult to measure slag build-up. The lack of measurement for slagging can restrict conventional neural network based coal fired boiler optimization, because no data can be used to train the neural network. This paper proposes a novel method of integrating non-dominated sorting genetic algorithm (NSGA II) based multi-objective optimization with computational fluid dynamics (CFD) to decrease or even avoid slagging inside a coal fired boiler furnace and improve boiler combustion efficiency. Compared with conventional neural network based boiler optimization methods, the method developed in the work can control and optimize the fields of flue gas properties such as temperature field inside a boiler by adjusting the temperature and velocity of primary and secondary air in coal fired power plant boiler control systems. The temperature in the vicinity of water wall tubes of a boiler can be maintained within the ash melting temperature limit. The incoming ash particles cannot melt and bond to surface of heat transfer equipment of a boiler. So the trend of slagging inside furnace is controlled. Furthermore, the

  8. Lake-sediment record of PAH, mercury, and fly-ash particle deposition near coal-fired power plants in Central Alberta, Canada.

    Science.gov (United States)

    Barst, Benjamin D; Ahad, Jason M E; Rose, Neil L; Jautzy, Josué J; Drevnick, Paul E; Gammon, Paul R; Sanei, Hamed; Savard, Martine M

    2017-12-01

    We report a historical record of atmospheric deposition in dated sediment cores from Hasse Lake, ideally located near both currently and previously operational coal-fired power plants in Central Alberta, Canada. Accumulation rates of spheroidal carbonaceous particles (SCPs), an unambiguous marker of high-temperature fossil-fuel combustion, in the early part of the sediment record (pre-1955) compared well with historical emissions from one of North America's earliest coal-fired power plants (Rossdale) located ∼43 km to the east in the city of Edmonton. Accumulation rates in the latter part of the record (post-1955) suggested inputs from the Wabamun region's plants situated ∼17-25 km to the west. Increasing accumulation rates of SCPs, polycyclic aromatic hydrocarbons (PAHs) and Hg coincided with the previously documented period of peak pollution in the Wabamun region during the late 1960s to early 1970s, although Hg deposition trends were also similar to those found in western North American lakes not directly affected by point sources. A noticeable reduction in contaminant inputs during the 1970s is attributed in part to technological improvements and stricter emission controls. The over one hundred-year historical record of coal-fired power plant emissions documented in Hasse Lake sediments has provided insight into the impact that both environmental regulations and changes in electricity output have had over time. This information is crucial to assessing the current and future role of coal in the world's energy supply. Crown Copyright © 2017. Published by Elsevier Ltd. All rights reserved.

  9. Analysis of failure events for expansion joints in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Masahiro [Institute of Nuclear Safety System Inc., Mihama, Fukui (Japan)

    2001-09-01

    Although a large number of expansion joints are used in nuclear power plants with light water reactors, their failure events have not been paid as much attention as those of vessels and pipes. However, as the operation period of nuclear power plants becomes longer, it is necessary to pay attention to their failure events as well as those of vessels and pipes, because aging problems and latent troubles originated in design or fabrication of expansion joints may appear during their long period operation. In this work, we investigated failure event reports of expansion joints in nuclear power plants both in Japan and in U.S.A. and analyzed (1) the influence to output power level, (2) the position and (3) the cause of each failure. It is revealed that the failure events of expansion joints have continuously occurred, some of which have exerted influence upon power level and have caused fatal or injury accidents of personnel, and hence the importance of corrective actions to prevent the recurrence of such events is pointed out. The importance of countermeasures to the following individual events is also pointed out: (1) corrosion of expansion joints in service water systems, (2) degradation of rubber expansion joints in main condensers, (3) vibration and fatigue of expansion joints in extraction steam lines and (4) transgranular stress corrosion cracking of penetration bellows of containments. (author)

  10. Cost-Effectiveness of Emission Reduction for the Indonesian Coal-Fired Power Plants

    NARCIS (Netherlands)

    Handayani, Kamia; Krozer, Yoram

    2014-01-01

    This paper presents the result of research on the cost-effectiveness of emission reduction in the selected coal-fired power plants (CFPPs) in Indonesia. The background of this research is the trend of more stringent environmental regulation regarding air emission from coal-fired power plants (CFPPs)

  11. Interim report on the state-of-the-art of solid-state motor controllers. Part 4. Failure-rate and failure-mode data

    International Nuclear Information System (INIS)

    Jaross, R.A.

    1983-09-01

    An assessment of the reliability of solid-state motor controllers for nuclear power plants is made. Available data on failure-rate and failure-mode data for solid-state motor controllers based on industrial operating experience is meager; the data are augmented by data on other solid-state power electronic devices that are shown to have components similar to those found in solid-state motor controllers. In addition to large nonnuclear solid-state adjustable-speed motor drives, the reliability of nuclear plant inverter systems and high-voltage solid-state dc transmission-line converters is assessed. Licensee Event Report analyses from several sources, the open literature, and personal communications are used to determine the realiability of solid-state devices typical of those expected to be used in nuclear power plants in terms of failures per hour

  12. Relative radiation hazards of coal based and nuclear power plants

    International Nuclear Information System (INIS)

    Mishra, U.C.

    1983-04-01

    Coal, like most materials found in nature, contains trace quantities of naturally occurring radionuclides. However, low concentrations may become important if large quantities of coal are burnt in thermal power plants. Therefore a study was performed to determine the radioactivity in coal, in fly-ash and slag and assess the importance of radioactive emissions from thermal power plants. The results were compared to the radiological impact of nuclear power stations. Based on these data, theoretical estimates for the population living within 80km from power stations indicate that the collective dose commitments of coal-fired plants are one order of magnitude higher than those for BWR-type nuclear plants. Measurements taken in the vicinity of coal-fired plants were comparable to those for nuclear plants, i.e. within the range of variation of natural background radiation in India

  13. Reduced ovulation rate, failure to be mated and fertilization failure/embryo loss are the underlying causes of poor reproductive performance in juvenile ewes.

    Science.gov (United States)

    Edwards, Sara J; Smaill, Bronwyn; O'Connell, Anne R; Johnstone, Peter D; Stevens, David R; Quirke, Laurel D; Farquhar, Philip A; Juengel, Jennifer L

    2016-04-01

    A ewe that is mated as a juvenile (producing a lamb at 1 year of age) will produce an average of only 0.6 lambs to weaning, compared to an average of 1.2 lambs in adult ewes. Understanding the underlying causes of this low reproductive efficiency and designing methods to improve or mitigate these effects could potentially increase adoption of mating juvenile ewes. In Experiment 1, 2 Cohorts of ewes, born a year apart, were mated in order to lamb at 1 and 2 years of age and the performance of the ewes at each age was compared. Onset of puberty, mating by the fertile ram, ovulation rate, early pregnancy (day 30-35) litter size, number of lambs born and number of lambs weaned were measured. In juvenile ewes, by day 35 of pregnancy, 43% of ova had failed to become a viable embryo and this early loss was the largest contributor to the poor reproductive performance observed. Compared with young adult ewes, ovulation rate was lower (pewes with a greater ovulation rate (pewes, failure to mate with the ram, lower ovulation rate and increased fertilisation failure/embryo loss underlie their poor reproductive performance. Copyright © 2016 Elsevier B.V. All rights reserved.

  14. Development and validation of advanced oxidation protective coatings for super critical steam power plant

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, M.B.; Scheefer, M. [Alstom Power Ltd., Rugby (United Kingdom); Agueero, A. [Instituto Nacional de Tecnica Aerospacial (INTA) (Spain); Allcock, B. [Monitor Coatings Ltd. (United Kingdom); Norton, B. [Indestructible Paints Ltd. (United Kingdom); Tsipas, D.N. [Aristotle Univ. of Thessaloniki (Greece); Durham, R. [FZ Juelich (Germany); Xiang, Z. [Northumbria Univ. (United Kingdom)

    2006-07-01

    Increasing the efficiency of coal-fired power plant by increasing steam temperatures and pressures brings benefits in terms of cheaper electricity and reduced emissions, particularly CO{sub 2}. In recent years the development of advanced 9%Cr ferritic steels with improved creep strength has enabled power plant operation at temperatures in excess of 600 C, such that these materials are being exploited to construct a new generation of advanced coalfired plant. However, the move to higher temperatures and pressures creates an extremely hostile oxidising environment. To enable the full potential of the new steels to be achieved, it is vital that protective coatings are developed, validated under high temperature steam and applied to candidate components from the steam path. This paper reviews recent work conducted within the Framework V project ''Coatings for Supercritical Steam Cycles'' (SUPERCOAT) to develop and demonstrate advanced slurry and thermal spray coatings capable of providing steam oxidation protection at temperatures in excess of 620 C and up to 300 bar. The programme of work has demonstrated the feasibility of applying a number of candidate coatings to steam turbine power plant components and has generated long-term steam oxidation rate and failure data that underpin the design and application work packages needed to develop and establish this technology for new and retrofit plant. (orig.)

  15. Circuit card failures and industry mitigation strategy

    Energy Technology Data Exchange (ETDEWEB)

    Mondal, U. [Candu Owners Group, Toronto, Ontario (Canada)

    2012-07-01

    In recent years the nuclear industry has experienced an increase in circuit card failures due to ageing of components, inadequate Preventive Maintenance (PM), lack of effective circuit card health monitoring, etc. Circuit card failures have caused loss of critical equipment, e.g., electro hydraulic governors, Safety Systems, resulting in loss of function and in some cases loss of generation. INPO completed a root cause analysis of 40 Reactor Trips/Scrams in US reactors and has recommended several actions to mitigate Circuit Card failures. Obsolescence of discrete components has posed many challenges in conducting effective preventative maintenance on circuit cards. In many cases, repairs have resulted in installation of components that compromise performance of the circuit cards. Improper termination and worn edge connectors have caused intermittent contacts contributing to circuit card failures. Traditionally, little attention is paid to relay functions and preventative maintenance of relay. Relays contribute significantly to circuit card failures and have dominated loss of generation across the power industry. The INPO study recommended a number of actions to mitigate circuit card failures, such as; identification of critical components and single point vulnerabilities; strategic preventative maintenance; protection of circuit boards against electrostatic discharge; limiting power cycles; performing an effective burn-in prior to commissioning of the circuit cards; monitoring performance of DC power supplies; limiting cabinet temperatures; managing of component aging/degradation mechanism, etc. A subcommittee has been set up under INPO sponsorship to understand the causes of circuit card failure and to develop an effective mitigation strategy. (author)

  16. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  17. Failure Rates in Introductory Programming

    DEFF Research Database (Denmark)

    Bennedsen, Jens; Caspersen, Michael Edelgaard

    2007-01-01

    It is a common conception that CS1 is a very difficult course and that failure rates are high. However, until now there has only been anecdotal evidence for this claim. This article reports on a survey among institutions around the world regarding failure rates in introductory programming courses...

  18. Life cycle assessment of solar aided coal-fired power system with and without heat storage

    International Nuclear Information System (INIS)

    Zhai, Rongrong; Li, Chao; Chen, Ying; Yang, Yongping; Patchigolla, Kumar; Oakey, John E.

    2016-01-01

    Highlights: • The comprehensive performances of three kinds of different systems were compared through LCA. • The comprehensive results of all systems were evaluated by grey relation theory. • The effects of life span, coal price, and solar collector field cost, among other factors, on the results were explored. - Abstract: Pollutant emissions from coal-fired power system have been receiving increasing attention over the past few years. Integration of solar thermal energy can greatly reduce pollutant emissions from these power stations. The performances of coal-fired power system (S1), solar aided coal-fired power system with thermal storage (S2), and solar aided coal-fired power system without thermal storage (S3) with three capacities of each kind of system (i.e., nine subsystems) were analyzed over the entire life span. The pollutant emissions and primary energy consumptions (PECs) of S1, S2, and S3 were estimated using life cycle assessment (LCA). The evaluation value of global warming potential (GWP), acidification potential (AP), respiratory effects potential (REP) and PEC were obtained based on the LCA results. Furthermore, the system investments were estimated, and grey relation theory was used to evaluate the performance of the three types of systems comprehensively. Finally, in order to find the effect of some main factors on the solar aided coal-fired power system (SACFPS), uncertainty analysis has been carried out. The LCA results show that the pollutant emissions and PEC mainly take place in the fuel processing and operation stages for all three system types, and S2 performs the best among the three systems based on the grey relation analysis results. And the uncertainty analysis shows that with longer life span, the power system have better performance; with higher coal price, the power system will have worse performance; with lower solar collector field cost, the solar aided coal-fired power system will be more profitable than the base

  19. Evaluation of the adequacy of maintenance tasks using the failure consequences of railroad vehicles

    International Nuclear Information System (INIS)

    Kim, Jaehoon; Jeong, Hyun- Yong

    2013-01-01

    The purpose of this study is to improve the efficiency, reliability and safety related to railroad maintenance tasks through an evaluation of the consequences of failures. The brake system was selected based on the failure data obtained from railroad vehicles in operation as one of the safety systems in railroad vehicles. The failure causes, failure effects, and the criticality of the failure mode were drawn for 62 failure modes of the braking system through the use of an FMECA for the 30 sub-devices having primary functions. The various maintenance tasks for the braking system were categorized into the 62 failure modes and failure consequences using the FMECA and the logic of maintenance decisions. Braking systems manufactured by the same manufacturer and operated by two different operators were studied in an effort to analyze preventive maintenance and to evaluate the adequacy of preventive maintenance tasks for the 62 failure modes. Based on results of the evaluation of these preventive maintenance tasks, new maintenance tasks were proposed, and concrete cost-cutting effects were determined from the calculation of the maintenance time and expected costs, using a preventive maintenance template developed specifically for railroad vehicles

  20. Redundancy allocation problem of a system with increasing failure rates of components based on Weibull distribution: A simulation-based optimization approach

    International Nuclear Information System (INIS)

    Guilani, Pedram Pourkarim; Azimi, Parham; Niaki, S.T.A.; Niaki, Seyed Armin Akhavan

    2016-01-01

    The redundancy allocation problem (RAP) is a useful method to enhance system reliability. In most works involving RAP, failure rates of the system components are assumed to follow either exponential or k-Erlang distributions. In real world problems however, many systems have components with increasing failure rates. This indicates that as time passes by, the failure rates of the system components increase in comparison to their initial failure rates. In this paper, the redundancy allocation problem of a series–parallel system with components having an increasing failure rate based on Weibull distribution is investigated. An optimization method via simulation is proposed for modeling and a genetic algorithm is developed to solve the problem. - Highlights: • The redundancy allocation problem of a series–parallel system is aimed. • Components possess an increasing failure rate based on Weibull distribution. • An optimization method via simulation is proposed for modeling. • A genetic algorithm is developed to solve the problem.

  1. Brittle Creep Failure, Critical Behavior, and Time-to-Failure Prediction of Concrete under Uniaxial Compression

    Directory of Open Access Journals (Sweden)

    Yingchong Wang

    2015-01-01

    Full Text Available Understanding the time-dependent brittle deformation behavior of concrete as a main building material is fundamental for the lifetime prediction and engineering design. Herein, we present the experimental measures of brittle creep failure, critical behavior, and the dependence of time-to-failure, on the secondary creep rate of concrete under sustained uniaxial compression. A complete evolution process of creep failure is achieved. Three typical creep stages are observed, including the primary (decelerating, secondary (steady state creep regime, and tertiary creep (accelerating creep stages. The time-to-failure shows sample-specificity although all samples exhibit a similar creep process. All specimens exhibit a critical power-law behavior with an exponent of −0.51 ± 0.06, approximately equal to the theoretical value of −1/2. All samples have a long-term secondary stage characterized by a constant strain rate that dominates the lifetime of a sample. The average creep rate expressed by the total creep strain over the lifetime (tf-t0 for each specimen shows a power-law dependence on the secondary creep rate with an exponent of −1. This could provide a clue to the prediction of the time-to-failure of concrete, based on the monitoring of the creep behavior at the steady stage.

  2. Natural radionuclides from the coal in atmospheric environment of the coal fired power plants

    International Nuclear Information System (INIS)

    Antic, D.; Kostic-Soskic, M.; Milovanovic, S.; Telenta, B.

    1995-01-01

    The inhalation radiation exposure of the public in the vicinity of the selected coal fired power plants near from Belgrade (30-50 km) has been studied, using a set of data for natural radionuclides from the analysed power plants. A generalised model for analysis of radiological impact of an energy source, that includes the two-dimensional version of the cloud model, has been used for simulation of the transport of radionuclides released to the atmosphere. The inhalation dose rates for an adult are assessed and analysed during fast changeable meteorological conditions. A set of realistic meteorological conditions (wind, radiosonde sounding temperature, pressure, and humidity data) has been used for the numerical simulations. (author)

  3. Hydrogen Fuel as Ecological Contribution to Operation of the Existing Coal-Fired Thermal Power Plants

    International Nuclear Information System (INIS)

    Cosic, D.

    2009-01-01

    The analysis is carried out of the application of a new hydrogen based alternative fuel as ecological contribution of the coal thermal power plants operation. Given the fact that coal thermal power plants are seen as the largest producers, not only of CO 2 , but of all others harmful gases, the idea is initiated to use the new alternative fuel as an additive to the coal which would result in much better performance of the coal power plants from an ecological point of view. It is possible to use such a fuel in relation of 10-30% of former coal use. The positive influence of such an application is much bigger than relative used quantity. This lecture has a goal to incite potential investors to create conditions for industrial testing of the new fuel. It will be very interesting to animate investors for large-scale production of the new fuel, too.(author).

  4. Coal-fired power plants and the causes of high temperature corrosion

    Energy Technology Data Exchange (ETDEWEB)

    Oakey, J E; Simms, N J [British Coal Corporation, Coal Technology Development Div., Cheltenham, Glos (United Kingdom); Tomkings, A B [ERA Technology Ltd., Leatherhead, Surrey (United Kingdom)

    1996-12-01

    The heat exchangers in all types of coal-fired power plant operate in aggressive, high temperature environments where high temperature corrosion can severely limit their service lives. The extent of this corrosion is governed by the combined effects of the operating conditions of the heat exchanger and the presence of corrosive species released from the coal during operation. This paper reviews the coal-related factors, such as ash deposition, which influence the operating environments of heat exchangers in three types of coal-fired power plant - conventional pulverized coal boilers, fluidized bed boilers and coal gasification systems. The effects on the performance of the materials used for these heat exchangers are then compared. (au) 35 refs.

  5. Income risk of EU coal-fired power plants after Kyoto

    International Nuclear Information System (INIS)

    Abadie, Luis M.; Chamorro, Jose M.

    2009-01-01

    Coal-fired power plants enjoy a significant advantage relative to gas plants in terms of cheaper fuel cost. This advantage may erode (or turn into disadvantage) depending on CO 2 emission allowance price. Financial risks are further reinforced when the price of electricity is determined by natural gas-fired plants' marginal costs. We aim to empirically assess the risks in EU coal plants' margins up to the year 2020. Parameter values are derived from actual market data. Monte Carlo simulation allows compute the expected value and risk profile of coal plants' earnings. Future allowance prices may spell significant risks on utilities' balance sheets. (author)

  6. Diesel-generator reliability at nuclear power plants: data and preliminary analysis. Interim report

    International Nuclear Information System (INIS)

    McClymont, A.; McLagan, G.

    1982-06-01

    This report summarizes work performed under RP1233-1 relating to the collection and analysis of data pertaining to diesel generator reliability in nuclear power plants. Drawing from data collected on-site at plants, data supplied by utilites, and data from Licensee Event Reports (LERs), the report describes methods of deriving reliability estimates from data for use in probabilistic risk assessment and presents results when these methods are applied to data collected from 14 plants. Specifically, data are used to estimate diesel failure probabilities for failures to start and failure rates for failures to continue to run. A sampling theory approach and a Bayesian approach to failure probability estimation are compared. The data are used to derive estimates of diesel repair time for some plants, maintenance outages, and multiple diesel failure rates. In addition, a section is included that presents suggestions for failure-rate estimation when an accurate count of diesel start attempts at a plant is not available. The final section presents an analysis of diesel failures based on data from LERs, including a breakdown of failure event by subsystem, failure mode, and failure cause. Appendixes include detailed summaries of the data used in the analysis of previous sections

  7. Metaiodobenzylguanidine and heart rate variability in heart failure

    International Nuclear Information System (INIS)

    Kurata, Chinori; Shouda, Sakae; Mikami, Tadashi; Uehara, Akihiko; Ishikawa, Keiko; Tawarahara, Kei; Nakano, Tomoyasu; Matoh, Fumitaka; Takeuchi, Kazuhiko

    1998-01-01

    It is assumed that the low-frequency power (LF) of heart rate variability (HRV) increases with progress of congestive heart failure (CHF), therefore positively correlating with cardiac 123 I-metaiodobenzylguanidine (MIBG) washout. It is demonstrated here that HRV, including normalized LF, correlated inversely with MIBG washout and positively with the ratio of heart-to-mediastinum MIBG activity in controls and CHF patients, whereas these correlations were not observed within CHF patients. Thus MIBG washout may increase and HRV including normalized LF may decrease with CHF, although the HRV and MIBG measures may not similarly change in proportion to the severity of the cardiac autonomic dysfunction in CHF. (author)

  8. Metaiodobenzylguanidine and heart rate variability in heart failure

    Energy Technology Data Exchange (ETDEWEB)

    Kurata, Chinori; Shouda, Sakae; Mikami, Tadashi; Uehara, Akihiko; Ishikawa, Keiko [Hamamatsu Univ., Shizuoka (Japan). School of Medicine; Tawarahara, Kei; Nakano, Tomoyasu; Matoh, Fumitaka; Takeuchi, Kazuhiko

    1998-10-01

    It is assumed that the low-frequency power (LF) of heart rate variability (HRV) increases with progress of congestive heart failure (CHF), therefore positively correlating with cardiac {sup 123}I-metaiodobenzylguanidine (MIBG) washout. It is demonstrated here that HRV, including normalized LF, correlated inversely with MIBG washout and positively with the ratio of heart-to-mediastinum MIBG activity in controls and CHF patients, whereas these correlations were not observed within CHF patients. Thus MIBG washout may increase and HRV including normalized LF may decrease with CHF, although the HRV and MIBG measures may not similarly change in proportion to the severity of the cardiac autonomic dysfunction in CHF. (author)

  9. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  10. Risk analysis of geothermal power plants using Failure Modes and Effects Analysis (FMEA) technique

    International Nuclear Information System (INIS)

    Feili, Hamid Reza; Akar, Navid; Lotfizadeh, Hossein; Bairampour, Mohammad; Nasiri, Sina

    2013-01-01

    Highlights: • Using Failure Modes and Effects Analysis (FMEA) to find potential failures in geothermal power plants. • We considered 5 major parts of geothermal power plants for risk analysis. • Risk Priority Number (RPN) is calculated for all failure modes. • Corrective actions are recommended to eliminate or decrease the risk of failure modes. - Abstract: Renewable energy plays a key role in the transition toward a low carbon economy and the provision of a secure supply of energy. Geothermal energy is a versatile source as a form of renewable energy that meets popular demand. Since some Geothermal Power Plants (GPPs) face various failures, the requirement of a technique for team engineering to eliminate or decrease potential failures is considerable. Because no specific published record of considering an FMEA applied to GPPs with common failure modes have been found already, in this paper, the utilization of Failure Modes and Effects Analysis (FMEA) as a convenient technique for determining, classifying and analyzing common failures in typical GPPs is considered. As a result, an appropriate risk scoring of occurrence, detection and severity of failure modes and computing the Risk Priority Number (RPN) for detecting high potential failures is achieved. In order to expedite accuracy and ability to analyze the process, XFMEA software is utilized. Moreover, 5 major parts of a GPP is studied to propose a suitable approach for developing GPPs and increasing reliability by recommending corrective actions for each failure mode

  11. Evaluation of mean time between forced outage for reactor protection system using RBD and failure rate

    International Nuclear Information System (INIS)

    Lee, D. Y.; Park, J. H.; Hwang, I. K.; Cha, K. H.; Choi, J. K.; Lee, K. Y.; Park, J. K.

    2001-01-01

    The design life of nuclear power plants (NPPs) under recent construction is about fifty to sixty years. However, the duration that equipments of control systems operate without failures is at most five to ten years. Design for diversity and adequate maintenance strategy are required for NPP protection system in order to use the control equipment which has shorter life time than the design life of NPP. Fault Tree Analysis (FTA) technique, which has been applied to Probabilistics Safety Analysis (PSA), has been introduced to quantitatively evaluate the reliability of NPP I and C systems. The FTA, however, cannot properly consider the effect of maintenance. In this work, we have reviewed quantitative reliability evaluation techniques using the reliability block diagram and failure rates and applied it to the evaluation of mean time between forced outage for reactor protection system

  12. Process simulation of co-firing torrefied biomass in a 220 MWe coal-fired power plant

    International Nuclear Information System (INIS)

    Li, Jun; Zhang, Xiaolei; Pawlak-Kruczek, Halina; Yang, Weihong; Kruczek, Pawel; Blasiak, Wlodzimierz

    2014-01-01

    Highlights: • The performances of torrefaction based co-firing power plant are simulated by using Aspen Plus. • Mass loss properties and released gaseous components have been studied during biomass torrefaction processes. • Mole fractions of CO 2 and CO account for 69–91% and 4–27% in total torrefied gases. • The electrical efficiency reduced when increasing either torrefaction temperature or substitution ratio of biomass. - Abstract: Torrefaction based co-firing in a pulverized coal boiler has been proposed for large percentage of biomass co-firing. A 220 MWe pulverized coal-power plant is simulated using Aspen Plus for full understanding the impacts of an additional torrefaction unit on the efficiency of the whole power plant, the studied process includes biomass drying, biomass torrefaction, mill systems, biomass/coal devolatilization and combustion, heat exchanges and power generation. Palm kernel shells (PKS) were torrefied at same residence time but 4 different temperatures, to prepare 4 torrefied biomasses with different degrees of torrefaction. During biomass torrefaction processes, the mass loss properties and released gaseous components have been studied. In addition, process simulations at varying torrefaction degrees and biomass co-firing ratios have been carried out to understand the properties of CO 2 emission and electricity efficiency in the studied torrefaction based co-firing power plant. According to the experimental results, the mole fractions of CO 2 and CO account for 69–91% and 4–27% in torrefied gases. The predicted results also showed that the electrical efficiency reduced when increasing either torrefaction temperature or substitution ratio of biomass. A deep torrefaction may not be recommended, because the power saved from biomass grinding is less than the heat consumed by the extra torrefaction process, depending on the heat sources

  13. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

    International Nuclear Information System (INIS)

    Xanthopoulos, A.S.; Koulouriotis, D.E.; Botsaris, P.N.

    2015-01-01

    Despite the fact that the fields of pull type production control policies and condition-based preventive maintenance have much in common contextually, they have evolved independently up to now. In this investigation, an attempt is made to bridge the gap between these two branches of knowledge by introducing the single-stage Kanban system with deterioration failures and condition-based preventive maintenance. The formalism of continuous time Markov chains is used to model the system and expressions for eight performance metrics are derived. Two important, from a managerial perspective, constrained optimization problems for the proposed model are defined where the objective is the simultaneous optimization of the Kanban policy, the preventive maintenance policy and the inspection schedule under conflicting performance criteria. Multiple instances of each optimization problem are solved by means of the augmented Lagrangian genetic algorithm. The results from the optimization trials coupled by the results from extensive numerical examples facilitate the thorough investigation of the system’s behaviour. - Highlights: • Kanban system with deterioration failures and preventive maintenance is introduced. • The system is modeled as a continuous time Markov chain. • Expressions for eight performance metrics are derived. • The behavior of the system is studied through numerical examples. • Optimization results for selected performance metrics are presented

  14. Corrosion-related failures in power plant condensers. Final report

    International Nuclear Information System (INIS)

    Beavers, J.A.; Agrawal, A.K.; Berry, W.E.

    1980-08-01

    A survey of the literature has been conducted for the Electric Power Research Institute on corrosion failures in surface condensers. The survey was directed toward condenser failures in pressurized water reactor (PWR) power plants but includes pertinent literature related to fossil and to other nuclear power plants. It includes literature on reported service failures and on experimental studies that impact on these failures

  15. A study of thermal-hydraulic requirements for increasing the power rates for natural-circulation boiling water reactors

    International Nuclear Information System (INIS)

    Yasuo, A.; Inada, F.; Hidaka, M.

    1992-01-01

    In this paper, the feasibility of higher power rates for natural-circulation boiling water reactors (BWRs) is studied with the objective of examining the flexibility of the plant power rate in constructing such plants to cope with the increasing demand for electricity. By applying existing one-dimensional design codes, the riser heights necessary to meet two major thermal-hydraulic requirements, i.e., critical power and core stability, are systematically calculated. Several restrictions on the maximum diameter and height of the pressure vessel are also considered because these restrictions could make construction impossible or drastically increase the construction costs. A very simple map of the dominant parameters for higher power rates is obtained. It is concluded that natural-circulation BWRs of >1000 MW (electric) will be feasible within the restrictions considered here

  16. Generator exchange is associated with an increased rate of Sprint Fidelis lead failure.

    Science.gov (United States)

    Lovelock, Joshua D; Patel, Ayesha; Mengistu, Andenet; Hoskins, Michael; El-Chami, Mikhael; Lloyd, Michael S; Leon, Angel; DeLurgio, David; Langberg, Jonathan J

    2012-10-01

    The Medtronic Sprint Fidelis defibrillator lead is at an increased risk for failure and was recalled in October 2007. Approximately 268,000 leads were implanted, and more than 100,000 patients still have active Fidelis leads. A number of studies have examined the rate and clinical predictors of lead failure, but none has addressed the effect of an implantable cardioverter-defibrillator generator exchange on subsequent lead failure. Although the manufacturer asserts that "Sprint Fidelis performance after device change-out is similar to lead performance without device change-out," published data are lacking. To assess the effect of implantable cardioverter-defibrillator generator exchange on the rate of Fidelis lead failure. A chart review was conducted in patients who underwent implantation of a Fidelis lead. Patients with a functioning Fidelis lead at generator exchange were compared with controls with leads implanted for a comparable amount of time not undergoing ICD replacement. A total of 1366 patients received a Fidelis lead prior to the recall, of which 479 were still actively followed. Seventy-two patients with a functioning lead underwent generator exchange without lead replacement. Following generator replacement, 15 leads failed. Sixty percent of the Fidelis leads failed within 3 months. Generator exchange increased the rate of lead failure compared with matched controls (20.8% vs 2.54%; P exchange is associated with a higher than expected rate of Fidelis lead failure, often within 3 months. The risk-benefit ratio of Fidelis lead replacement at the time of generator exchange may be greater than appreciated. Copyright © 2012 Heart Rhythm Society. Published by Elsevier Inc. All rights reserved.

  17. Fighting and preventing post-earthquake fires in nuclear power plant

    International Nuclear Information System (INIS)

    Lu Xuefeng; Zhang Xin

    2011-01-01

    Nuclear power plant post-earthquake fires will cause not only personnel injury, severe economic loss, but also serious environmental pollution. For the moment, nuclear power is in a position of rapid development in China. Considering the earthquake-prone characteristics of our country, it is of great engineering importance to investigate the nuclear power plant post-earthquake fires. This article analyzes the cause, influential factors and development characteristics of nuclear power plant post-earthquake fires in details, and summarizes the three principles should be followed in fighting and preventing nuclear power plant post-earthquake fires, such as solving problems in order of importance and urgency, isolation prior to prevention, immediate repair and regular patrol. Three aspects were pointed out that should be paid attention in fighting and preventing post-earthquake fires. (authors)

  18. Opportunities for Decarbonizing Existing U.S. Coal-Fired Power Plants via CO2 Capture, Utilization and Storage.

    Science.gov (United States)

    Zhai, Haibo; Ou, Yang; Rubin, Edward S

    2015-07-07

    This study employs a power plant modeling tool to explore the feasibility of reducing unit-level emission rates of CO2 by 30% by retrofitting carbon capture, utilization, and storage (CCUS) to existing U.S. coal-fired electric generating units (EGUs). Our goal is to identify feasible EGUs and their key attributes. The results indicate that for about 60 gigawatts of the existing coal-fired capacity, the implementation of partial CO2 capture appears feasible, though its cost is highly dependent on the unit characteristics and fuel prices. Auxiliary gas-fired boilers can be employed to power a carbon capture process without significant increases in the cost of electricity generation. A complementary CO2 emission trading program can provide additional economic incentives for the deployment of CCS with 90% CO2 capture. Selling and utilizing the captured CO2 product for enhanced oil recovery can further accelerate CCUS deployment and also help reinforce a CO2 emission trading market. These efforts would allow existing coal-fired EGUs to continue to provide a significant share of the U.S. electricity demand.

  19. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  20. Coal consumption minimizing by increasing thermal energy efficiency at ROMAG-PROD Heavy Water Plant

    International Nuclear Information System (INIS)

    Preda, Marius Cristian

    2006-01-01

    ROMAG-PROD Heavy Water Plant is a large thermal energy consumer using almost all the steam output from ROMAG-TERMO Power Plant - the steam cost weight in the total heavy water price is about 40%. The steam consumption minimizing by modernization of isotopic exchange facilities and engineering development in ROMAG-PROD Heavy Water Plant results in an corresponding decrease of coal amount burned at ROMAG-TERMO boilers. This decrease could be achieved mainly by the followings ways: - Facility wrappings integrity; - High performance heat exchangers; - Refurbished heat insulations; - Modified condenser-collecting pipeline routes; - High performance steam traps; - Heat electric wire. When coal is burned in Power Plant burners to obtain thermal energy, toxic emissions results in flue gases, such as: - CO 2 and NO x with impact on climate warming; - SO 2 which results in ozone layer thinning effect and in acid rain falls. From the value of steam output per burned coal: 1 GCal steam = 1.41 tone steam = 0.86 thermal MW = 1.1911 tones burned coal (lignite), it is obvious that by decreasing the thermal energy consumption provided for ROMAG PROD, a coal amount decrease is estimated at about 45 t/h, or about 394,200 t/year coal, which means about 10% of the current coal consumption at ROMAG-TERMO PP. At the same time, by reducing the burned coal amount, an yearly decrease in emissions into air to about 400,000 tones CO 2 is expected

  1. A preventive maintenance model with a two-level inspection policy based on a three-stage failure process

    International Nuclear Information System (INIS)

    Wang, Wenbin; Zhao, Fei; Peng, Rui

    2014-01-01

    Inspection is always an important preventive maintenance (PM) activity and can have different depths and cover all or part of plant systems. This paper introduces a two-level inspection policy model for a single component plant system based on a three-stage failure process. Such a failure process divides the system′s life into three stages: good, minor defective and severe defective stages. The first level of inspection, the minor inspection, can only identify the minor defective stage with a certain probability, but can always reveal the severe defective stage. The major inspection can however identify both defective stages perfectly. Once the system is found to be in the minor defective stage, a shortened inspection interval is adopted. If however the system is found to be in the severe defective stage, we may delay the maintenance action if the time to the next planned PM window is less than a threshold level, but otherwise, replace immediately. This corresponds to the well adopted maintenance policy in practice such as periodic inspections with planned PMs. A numerical example is presented to demonstrate the proposed model by comparing with other models. - Highlights: • The system′s deterioration goes through a three-stage process, namely, normal, minor defective and severe defective. • Two levels of inspections are proposed, e.g., minor and major inspections. • Once the minor defective stage is found, instead of taking a maintenance action, a shortened inspection interval is recommended. • When the severe defective stage is found, we delay the maintenance according to the threshold to the next PM. • The decision variables are the inspection intervals and the threshold to PM

  2. Nuclear power plant fire protection: fire detection (subsystems study Task 2)

    International Nuclear Information System (INIS)

    Berry, D.L.

    1977-12-01

    This report examines the adequacy of fire detection in the context of nuclear power plant safety. Topics considered are: (1) establishing area detection requirements, (2) selecting specific detector types, (3) locating and spacing detectors, and (4) performing installation tests and maintenance. Based on a thorough review of fire detection codes and standards and fire detection literature, the report concludes that current design and regulatory guidelines alone are insufficient to ensure satisfactory fire detection system performance. To assure adequate fire detection, this report recommends the use of in-place testing of detectors under conditions expected to occur normally in areas being protected

  3. Study of a simplified method of evaluating the economic maintenance importance of components in nuclear power plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Takagi, Toshiyuki; Kodama, Noriko

    2014-01-01

    Safety risk importance of components in nuclear power plants has been evaluated based on the probabilistic risk assessment and used for the decisions in various plant managements. But economic risk importance of the components has not been discussed very much. Therefore, this paper discusses risk importance of the components from the viewpoint of plant economic efficiency and proposes a simplified evaluation method of the economic risk importance (or economic maintenance importance). As a result of consideration, the followings were obtained. (1) A unit cost of power generation is selected as a performance indicator and can be related to a failure rate of components in nuclear power plant which is a result of maintenance. (2) The economic maintenance importance has to major factors, i.e. repair cost at component failure and production loss associated with plant outage due to component failure. (3) The developed method enables easy understanding of economic impacts of plant shutdown or power reduction due to component failures on the plane which adopts the repair cost in vertical axis and the production loss in horizontal axis. (author)

  4. Reducing water freshwater consumption at coal-fired power plants : approaches used outside the United States.

    Energy Technology Data Exchange (ETDEWEB)

    Elcock, D. (Environmental Science Division)

    2011-05-09

    Coal-fired power plants consume huge quantities of water, and in some water-stressed areas, power plants compete with other users for limited supplies. Extensive use of coal to generate electricity is projected to continue for many years. Faced with increasing power demands and questionable future supplies, industries and governments are seeking ways to reduce freshwater consumption at coal-fired power plants. As the United States investigates various freshwater savings approaches (e.g., the use of alternative water sources), other countries are also researching and implementing approaches to address similar - and in many cases, more challenging - water supply and demand issues. Information about these non-U.S. approaches can be used to help direct near- and mid-term water-consumption research and development (R&D) activities in the United States. This report summarizes the research, development, and deployment (RD&D) status of several approaches used for reducing freshwater consumption by coal-fired power plants in other countries, many of which could be applied, or applied more aggressively, at coal-fired power plants in the United States. Information contained in this report is derived from literature and Internet searches, in some cases supplemented by communication with the researchers, authors, or equipment providers. Because there are few technical, peer-reviewed articles on this topic, much of the information in this report comes from the trade press and other non-peer-reviewed references. Reducing freshwater consumption at coal-fired power plants can occur directly or indirectly. Direct approaches are aimed specifically at reducing water consumption, and they include dry cooling, dry bottom ash handling, low-water-consuming emissions-control technologies, water metering and monitoring, reclaiming water from in-plant operations (e.g., recovery of cooling tower water for boiler makeup water, reclaiming water from flue gas desulfurization [FGD] systems), and

  5. Increasing coal-fired power generation efficiency to reduce electric cost and environmental emissions

    International Nuclear Information System (INIS)

    Torrens, I.M.; Stenzel, W.C.

    1997-01-01

    New generating capacity required globally between 1993 and 2010 is estimated to be around 1500 GW, of which some two-thirds will be outside the OECD, and some 40 % in the Asian non-OECD countries. Coal is likely to account for a substantial fraction of this new generation. Today's state-of-the-art supercritical coal-fired power plant has a conversion efficiency of some 42-45 %. The capital cost increase associated with the supercritical or ultra-supercritical pulverized coal power plant compared to a conventional subcritical plant is small to negligible. The increased efficiency associated with the supercritical plant leads to an actual reduction in the total cost of electricity generated in cents/kWh, relative to a conventional plant. Despite this, the power sector continues to build subcritical plants and has no near term plans to increase the efficiency of power plants in the projects it is developing. Advanced clean coal technologies such as integrated gasification combined cycle and pressurized fluidized bed combustion will be selected for independent power projects only in very specific circumstances. Advanced clean coal plants can be operated reliably and with superior performance, and specifically that their present estimated capital costs can be reduced substantially to a point where they are competitive with state-of-the-art pulverized coal technologies. (R.P.)

  6. Energy consumption and energy-saving potential analysis of pollutant abatement systems in a 1000MW coal-fired power plant.

    Science.gov (United States)

    Yang, Hang; Zhang, Yongxin; Zheng, Chenghang; Wu, Xuecheng; Chen, Linghong; Gao, Xiang; Fu, Joshua S

    2018-05-10

    The pollutant abatement systems are widely applied in the coal-fired power sector and the energy consumption was considered an important part of the auxiliary power. An energy consumption analysis and assessment model of pollutant abatement systems in a power unit was developed based on the dynamic parameters and technology. The energy consumption of pollutant abatement systems in a 1000 MW coal-fired power unit which meet the ultra-low emission limits and the factors of operating parameters including unit load and inlet concentration of pollutants on the operating power were analyzed. The results show that the total power consumption of the pollutant abatement systems accounted for 1.27% of the gross power generation during the monitoring period. The WFGD system consumed 67% of the rate while the SCR and ESP systems consumed 8.9% and 24.1%. The power consumption rate of pollutant abatement systems decreased with the increase of unit load and increased with the increase of the inlet concentration of pollutants. The operation adjustment was also an effective method to increase the energy efficiency. For example, the operation adjustment of slurry circulation pumps could promote the energy-saving operation of WFGD system. Implication Statement The application of pollutant abatement technologies increases the internal energy consumption of the power plant, which will lead to an increase of power generation costs. The real-time energy consumption of the different pollutant abatement systems in a typical power unit is analyzed based on the dynamic operating data. Further, the influence of different operating parameters on the operating power of the system and the possible energy-saving potential are analyzed.

  7. Life cycle assessment of coal-fired power plants and sensitivity analysis of CO2 emissions from power generation side

    Science.gov (United States)

    Yin, Libao; Liao, Yanfen; Zhou, Lianjie; Wang, Zhao; Ma, Xiaoqian

    2017-05-01

    The life cycle assessment and environmental impacts of a 1000MW coal-fired power plant were carried out in this paper. The results showed that the operation energy consumption and pollutant emission of the power plant are the highest in all sub-process, which accounts for 93.93% of the total energy consumption and 92.20% of the total emission. Compared to other pollutant emissions from the coal-fired power plant, CO2 reached up to 99.28%. Therefore, the control of CO2 emission from the coal-fired power plants was very important. Based on the BP neural network, the amount of CO2 emission from the generation side of coal-fired power plants was calculated via carbon balance method. The results showed that unit capacity, coal quality and unit operation load had great influence on the CO2 emission from coal-fired power plants in Guangdong Province. The use of high volatile and high heat value of coal also can reduce the CO2 emissions. What’s more, under higher operation load condition, the CO2 emissions of 1 kWh electric energy was less.

  8. Radiological Impact Study of the Coal-Fired Power Plant of Narcea

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Baeza, A.; Mora, J. a.; Corbacho, J. a.; Trueba, C.; Guillen, J.; Rodriguez, Miralles, Y.

    2014-04-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of {sup 2}38U, {sup 2}35U, {sup 2}32Th and also the 40K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the noncombustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the Narcea coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  9. Optimized CO2-flue gas separation model for a coal fired power plant

    Energy Technology Data Exchange (ETDEWEB)

    Arachchige, Udara S.P.R. [Telemark University College, Porsgrunn (Norway); Mohsin, Muhammad [Telemark University College, Porsgrunn (Norway); Melaaen, Morten C. [Telemark University College, Porsgrunn (Norway); Tel-Tek, Porsgrunn (Norway)

    2013-07-01

    The detailed description of the CO2 removal process using mono-ethylamine (MEA) as a solvent for coal-fired power plant is present in this paper. The rate based Electrolyte NRTL activity coefficient model was used in the Aspen Plus. The complete removal process with re-circulating solvent back to the absorber was implemented with the sequential modular method in Aspen Plus. The most significant cost related to CO2 capture is the energy requirement for re-generating solvent, i.e. re-boiler duty. Parameters’ effects on re-boiler duty were studied, resulting decreased re-boiler duty with the packing height and absorber packing diameter, absorber pressure, solvent temperature, stripper packing height and diameter. On the other hand, with the flue gas temperature, re-boiler duty is increased. The temperature profiles and CO2 loading profiles were used to check the model behavior.

  10. MERCURY EMISSIONS FROM COAL FIRED POWER PLANTS LOCAL IMPACTS ON HUMAN HEALTH RISK.

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN, T.M.; BOWERMAN, B.; ADAMS, J.; LIPFERT, F.; MORRIS, S.M.; BANDO, A.; PENA, R.; BLAKE, R.

    2005-12-01

    A thorough quantitative understanding of the processes of mercury emissions, deposition, and translocation through the food chain is currently not available. Complex atmospheric chemistry and dispersion models are required to predict concentration and deposition contributions, and aquatic process models are required to predict effects on fish. However, there are uncertainties in all of these predictions. Therefore, the most reliable method of understanding impacts of coal-fired power plants on Hg deposition is from empirical data. A review of the literature on mercury deposition around sources including coal-fired power plants found studies covering local mercury concentrations in soil, vegetation, and animals (fish and cows). There is strong evidence of enhanced local deposition within 3 km of the chlor-alkali plants, with elevated soil concentrations and estimated deposition rates of 10 times background. For coal-fired power plants, the data show that atmospheric deposition of Hg may be slightly enhanced. On the scale of a few km, modeling suggests that wet deposition may be increased by a factor of two or three over background. The measured data suggest lower increases of 15% or less. The effects of coal-fired plants seem to be less than 10% of total deposition on a national scale, based on emissions and global modeling. The following summarizes our findings from published reports on the impacts of local deposition. In terms of excesses over background the following increments have been observed within a few km of the plant: (1) local soil concentration Hg increments of 30%-60%, (2) sediment increments of 18-30%, (3) wet deposition increments of 11-12%, and (4) fish Hg increments of about 5-6%, based on an empirical finding that fish concentrations are proportional to the square root of deposition. Important uncertainties include possible reductions of RGM to Hg{sub 0} in power plant plumes and the role of water chemistry in the relationship between Hg

  11. The effect of coal-fired power-plant SO2 and NOx control technologies on aerosol nucleation in the source plumes

    Directory of Open Access Journals (Sweden)

    E. M. Knipping

    2012-12-01

    Full Text Available Nucleation in coal-fired power-plant plumes can greatly contribute to particle number concentrations near source regions. The changing emissions rates of SO2 and NOx due to pollution-control technologies over recent decades may have had a significant effect on aerosol formation and growth in the plumes with ultimate implications for climate and human health. We use the System for Atmospheric Modeling (SAM large-eddy simulation model with the TwO-Moment Aerosol Sectional (TOMAS microphysics algorithm to model the nucleation in plumes of coal-fired plants. We test a range of cases with varying emissions to simulate the implementation of emissions-control technologies between 1997 and 2010. We start by simulating the W. A. Parish power plant (near Houston, TX during this time period, when NOx emissions were reduced by ~90% and SO2 emissions decreased by ~30%. Increases in plume OH (due to the reduced NOx produced enhanced SO2 oxidation and an order-of-magnitude increase in particle nucleation in the plume despite the reduction in SO2 emissions. These results suggest that NOx emissions could strongly regulate particle nucleation and growth in power-plant plumes. Next, we test a range of cases with varying emissions to simulate the implementation of SO2 and NOx emissions-control technologies. Particle formation generally increases with SO2 emission, while NOx shows two different regimes: increasing particle formation with increasing NOx under low-NOx emissions and decreasing particle formation with increasing NOx under high-NOx emissions. Next, we compare model results with airborne measurements made in the W. A. Parish power-plant plume in 2000 and 2006, confirming the importance of NOx emissions on new particle formation and highlighting the substantial effect of background aerosol loadings on this process (the more polluted background of the 2006 case caused more than an order-of-magnitude reduction in particle formation in the plume compared to

  12. Assessment of surge arrester failure rate and application studies in Hellenic high voltage transmission lines

    Energy Technology Data Exchange (ETDEWEB)

    Christodoulou, C.A.; Fotis, G.P.; Gonos, I.F.; Stathopulos, I.A. [National Technical University of Athens, School of Electrical and Computer Engineering, High Voltage Laboratory, 9 Iroon Politechniou St., Zografou Campus, 157 80 Athens (Greece); Ekonomou, L. [A.S.PE.T.E. - School of Pedagogical and Technological Education, Department of Electrical Engineering Educators, N. Heraklion, 141 21 Athens (Greece)

    2010-02-15

    The use of transmission line surge arresters to improve the lightning performance of transmission lines is becoming more common. Especially in areas with high soil resistivity and ground flash density, surge arresters constitute the most effective protection mean. In this paper a methodology for assessing the surge arrester failure rate based on the electrogeometrical model is presented. Critical currents that exceed arresters rated energy stress were estimated by the use of a simulation tool. The methodology is applied on operating Hellenic transmission lines of 150 kV. Several case studies are analyzed by installing surge arresters on different intervals, in relation to the region's tower footing resistance and the ground flash density. The obtained results are compared with real records of outage rate showing the effectiveness of the surge arresters in the reduction of the recorded failure rate. The presented methodology can be proved valuable to the studies of electric power systems designers intending in a more effective lightning protection, reducing the operational costs and providing continuity of service. (author)

  13. Creep life prediction of super heater coils used in coal based thermal power plants subjected to fly ash erosion and oxide scale formation

    Science.gov (United States)

    Srinivasan, P.; Kushwaha, Shashank

    2018-04-01

    Super heater coils of the coal based thermal power plants and subjected to severe operating conditions from both steam side and gas side. Formation of oxide scale due to prolonged service lead to temperature raise of the tube and erosion due to fly ash present in the combusted gases leads to tube thinning. Both these factors lead to creep rupture of the coils much before the designed service life. Failure of super heater coils during service of the boiler leads to power loss and huge monitory loss to the power plants. An attempt is made to model the creep damage caused to the super heater coils using heat transfer analysis tube thinning due to erosive wear of the tubes. Combined effects of these parameters are taken into consideration to predict the life of the super heater coils. This model may be used to estimate the life of the coils operating under the severe operating conditions to prevent the unexpected failure of the coils.

  14. Fire prevention in nuclear plants

    International Nuclear Information System (INIS)

    Cayla, J.P.; Jacquet-Francillon, J.; Matarozzo, F.

    2014-01-01

    About 80 fire starts are reported in EDF nuclear power plants every year but only 3 or 4 turn into a real fire and none has, so far, has led to a major safety failure of a nuclear plant. A new regulation has been implemented in july 2014 that strengthens the concept of defense in depth, proposes an approach that is proportionate to the stakes and risks, this proportionality means that the requirements for a power reactor are not the same as for a nuclear laboratory, and imposes an obligation or result rather than of means. The second article deals with the fire that broke out in the waste silo number 130 at La Hague plant in january 1981. The investigation showed that the flammability of the silo content had been underestimated. The third article presents the consequences of the fire that broke out in a power transformer at the Cattenom plant in june 2013. The fire was rapidly brought under control thanks to the immediate triggering of the emergency plan. The article details also the feedback experience of this event. (A.C.)

  15. Catastrophic Failure and Critical Scaling Laws of Fiber Bundle Material

    Directory of Open Access Journals (Sweden)

    Shengwang Hao

    2017-05-01

    Full Text Available This paper presents a spring-fiber bundle model used to describe the failure process induced by energy release in heterogeneous materials. The conditions that induce catastrophic failure are determined by geometric conditions and energy equilibrium. It is revealed that the relative rates of deformation of, and damage to the fiber bundle with respect to the boundary controlling displacement ε0 exhibit universal power law behavior near the catastrophic point, with a critical exponent of −1/2. The proportion of the rate of response with respect to acceleration exhibits a linear relationship with increasing displacement in the vicinity of the catastrophic point. This allows for the prediction of catastrophic failure immediately prior to failure by extrapolating the trajectory of this relationship as it asymptotes to zero. Monte Carlo simulations are completed and these two critical scaling laws are confirmed.

  16. Exergetic and Parametric Study of a Solar Aided Coal-Fired Power Plant

    Directory of Open Access Journals (Sweden)

    Eric Hu

    2013-03-01

    Full Text Available A solar-aided coal-fired power plant realizes the integration of a fossil fuel (coal or gas and clean energy (solar. In this paper, a conventional 600 MW coal-fired power plant and a 600 MW solar-aided coal-fired power plant have been taken as the study case to understand the merits of solar-aided power generation (SAPG technology. The plants in the case study have been analyzed by using the First and Second Laws of Thermodynamics principles. The solar irradiation and load ratio have been considered in the analysis. We conclude that if the solar irradiation was 925 W/m2 and load ratio of the SAPG plant was 100%, the exergy efficiency would be 44.54% and the energy efficiency of the plant (46.35%. It was found that in the SAPG plant the largest exergy loss was from the boiler, which accounted for about 76.74% of the total loss. When the load ratio of the unit remains at 100%, and the solar irradiation varies from 500 W/m2 to 1,100 W/m2, the coal savings would be in the range of 8.6 g/kWh to 15.8 g/kWh. If the solar irradiation were kept at 925 W/m2 while the load ratio of the plant changed from 30% to 100%, the coal savings could be in the range of 11.99 g/kWh to 13.75 g/kWh.

  17. UNEP Demonstrations of Mercury Emission Reduction at Two Coal-fired Power Plants in Russia

    Directory of Open Access Journals (Sweden)

    Jozewicz W.

    2013-04-01

    Full Text Available The United Nations Environment Programme (UNEP partnership area “Mercury releases from coal combustion” (The UNEP Coal Partnership has initiated demonstrations of mercury air emission reduction at two coal-fired power plants in Russia. The first project has modified the wet particulate matter (PM scrubber installed in Toliatti thermal plant to allow for addition of chemical reagents (oxidants into the closedloop liquid spray system. The addition of oxidant resulted in significant improvement of mercury capture from 20% total mercury removal (without the additive up to 60% removal (with the additive. It demonstrates the effectiveness of sorbent injection technologies in conjunction with an electrostatic precipitator (ESP. ESPs are installed at 60%, while wet PM scrubbers are installed at 30% of total coal-fired capacity in Russia. Thus, the two UNEP Coal Partnership projects address the majority of PM emission control configurations occurring in Russia.

  18. Increase in efficiency and reduction of generation cost at hard coal-fired power plants. Post-combustion of combustion residues from co-firing of RDF and biomass during dry ash removal

    Energy Technology Data Exchange (ETDEWEB)

    Baur, Guenter [Magaldi Power GmbH, Esslingen (Germany); Spindeldreher, Olaf [RWE Generation SE, Werne (Germany); RWE Generation SE, Essen (Germany)

    2013-09-01

    Secondary as well as substitute fuels are being used in hard coal-fired power plants to improve efficiency and to enlarge fuel flexibility. However, grinding and firing systems of the existing coal-fired plants are not designed for those co-fuels. Any deterioration of the combustion performance would reduce the power output and increase ash disposal costs by increased content of combustion residues. The application of air-cooled ash removal, with simultaneous and controlled post-combustion of unburned residues on the conveyor belt, enlarges the furnace and maintains combustion efficiency even with different fuel qualities. Plant efficiency can also be increased through heat recovery. (orig.)

  19. Technology Roadmap: High-Efficiency, Low-Emissions Coal-Fired Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    Coal is the largest source of power globally and, given its wide availability and relatively low cost, it is likely to remain so for the foreseeable future. The High-Efficiency, Low-Emissions Coal-Fired Power Generation Roadmap describes the steps necessary to adopt and further develop technologies to improve the efficiency of the global fleet of coal. To generate the same amount of electricity, a more efficient coal-fired unit will burn less fuel, emit less carbon, release less local air pollutants, consume less water and have a smaller footprint. High-efficiency, low emissions (HELE) technologies in operation already reach a thermal efficiency of 45%, and technologies in development promise even higher values. This compares with a global average efficiency for today’s fleet of coal-fired plants of 33%, where three-quarters of operating units use less efficient technologies and more than half is over 25 years old. A successful outcome to ongoing RD&D could see units with efficiencies approaching 50% or even higher demonstrated within the next decade. Generation from older, less efficient technology must gradually be phased out. Technologies exist to make coal-fired power generation much more effective and cleaner burning. Of course, while increased efficiency has a major role to play in reducing emissions, particularly over the next 10 years, carbon capture and storage (CCS) will be essential in the longer term to make the deep cuts in carbon emissions required for a low-carbon future. Combined with CCS, HELE technologies can cut CO2 emissions from coal-fired power generation plants by as much as 90%, to less than 100 grams per kilowatt-hour. HELE technologies will be an influential factor in the deployment of CCS. For the same power output, a higher efficiency coal plant will require less CO2 to be captured; this means a smaller, less costly capture plant; lower operating costs; and less CO2 to be transported and stored.

  20. Soil to plant transfer factor in the vicinity of coal fired power plants

    International Nuclear Information System (INIS)

    Nikolic, J.; Todorovic, D.; Jankovic, M.; Radenkovic, M.; Joksic, J.

    2009-01-01

    In this paper, the monitoring of working and living environment results in 5 coal fired powered plants, for the period from 2004. to 2009. are presented. Soil-plant transfer factor, suitable for estimation of possible contamination of food chain was chosen, as a measure of influence of power plants on the environment. The results gathered over the years of monitoring of working and living environment in the vicinity of the coal fired power plant were analyzed, and it was determined that no significant discrepancy exists comparing to the results reported in world literature. Also, the basic mathematical analysis was conducted, in order to assess the model of the behavior of the results in respect to the frequency count. (author) [sr

  1. Human failure evolution process and prevention

    International Nuclear Information System (INIS)

    Chen Zhenwen

    2006-01-01

    The human failure in the nuclear power plant is analyzed. According to the staff career development and professional qualification 3 stages of the human failure evolution, viz, cognition, logics and emotion are defined. Some human failure prevention measures are brought forward from both the microcosmic and macrocosmic point of view. (author)

  2. CHARACTERIZATION AND MODELING OF THE FORMS OF MERCURY FROM COAL-FIRED POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Dennis L. Laudal

    2001-08-01

    The 1990 Clean Air Act Amendments (CAAAs) required the U.S. Environmental Protection Agency (EPA) to determine whether the presence of mercury in the stack emissions from fossil fuel-fired electric utility power plants poses an unacceptable public health risk. EPA's conclusions and recommendations were presented in the Mercury Study Report to Congress (1) and the Utility Air Toxics Report to Congress (1). The first report addressed both the human health and environmental effects of anthropogenic mercury emissions, while the second addressed the risk to public health posed by the emission of mercury and other hazardous air pollutants from steam-electric generating units. Given the current state of the art, these reports did not state that mercury controls on coal-fired electric power stations would be required. However, they did indicate that EPA views mercury as a potential threat to human health. In fact, in December 2000, the EPA issued an intent to regulate for mercury from coal-fired boilers. However, it is clear that additional research needs to be done in order to develop economical and effective mercury control strategies. To accomplish this objective, it is necessary to understand mercury behavior in coal-fired power plants. The markedly different chemical and physical properties of the different mercury forms generated during coal combustion appear to impact the effectiveness of various mercury control strategies. The original Characterization and Modeling of the Forms of Mercury from Coal-Fired Power Plants project had two tasks. The first was to collect enough data such that mercury speciation could be predicted based on relatively simple inputs such as coal analyses and plant configuration. The second was to field-validate the Ontario Hydro mercury speciation method (at the time, it had only been validated at the pilot-scale level). However, after sampling at two power plants (the Ontario Hydro method was validated at one of them), the EPA issued

  3. Strategic planning on carbon capture from coal fired plants in Malaysia and Indonesia: A review

    International Nuclear Information System (INIS)

    Othman, M.R.; Martunus; Zakaria, R.; Fernando, W.J.N.

    2009-01-01

    Malaysia and Indonesia benefit in various ways by participating in CDM and from investments in the GHG emission reduction projects, inter alia, technology transfer such as carbon capture (CC) technology for the existing and future coal fired power plants. Among the fossil fuel resources for energy generation, coal is offering an attractive solution to the increasing fuel cost. The consumption of coal in Malaysia and Indonesia is growing at the fastest rate of 9.7% and 4.7%, respectively, per year since 2002. The total coal consumption for electricity generation in Malaysia is projected to increase from 12.4 million tons in 2005 to 36 million tons in 2020. In Indonesia, the coal consumption for the same cause is projected to increase from 29.4 million tons in 2005 to 75 million tons in 2020. CO 2 emission from coal fired power plants are forecasted to grow at 4.1% per year, reaching 98 million tons and 171 million tons in Malaysia and Indonesia, respectively.

  4. Sequential decision reliability concept and failure rate assessment

    International Nuclear Information System (INIS)

    Ciftcioglu, O.

    1990-11-01

    Conventionally, a reliability concept is considered together with both each basic unit and their integration in a complicated large scale system such as a nuclear power plant (NPP). Basically, as the plant's operational status is determined by the information obtained from various sensors, the plant's reliability and the risk assessment is closely related to the reliability of the sensory information and hence the sensor components. However, considering the relevant information-processing systems, e.g. fault detection processors, there exists a further question about the reliability of such systems, specifically the reliability of the systems' decision-based outcomes by means of which the further actions are performed. To this end, a general sequential decision reliability concept and the failure rate assessment methodology is introduced. The implications of the methodology are investigated and the importance of the decision reliability concept in system operation is demonstrated by means of sensory signals in real-time from the Borssele NPP in the Netherlands. (author). 21 refs.; 8 figs

  5. Operational failure at the Paks Nuclear Power Plant

    International Nuclear Information System (INIS)

    Szatmary, Z.

    2003-01-01

    NPP failures are ranked according to the International Nuclear Event Scale. To rank the failure first a presentation of the pressurized water plant is given, including fuel change, maintenance cleaning and decontamination process. The failure has been produced with fuel bars in the cleaning container. Consequences of the failure are small, negligible environmental pollution with radioactive material and significant financial outfall due to inactivity of block 2. Among the causes of the failure are design errors of the cleaning container, the pure chemical approach to cleaning, unknown risk factors for some of the cleaning staff, cleaning container has not been verified and approved by responsible authorities, the prevalence of economic and quantitative indicators of the plant on the detriment of safety. Organisational factors also contribute to the possibility of nuclear failures. Specialist training in Germany (where the container has been produced) is significantly reduced, while in Hungary the political tide has caused a permanent change in the higher echelons of the plant management, where nuclear specialists were not included. (Gy.M.)

  6. Long-term measurements with a mercury monitor in a hard coal power plant; Langzeitmessungen mit einem Quecksilbermonitor im Steinkohlekraftwerk

    Energy Technology Data Exchange (ETDEWEB)

    Korell, Jens; Paur, Hanns R.; Seifert, Helmut [Forschungszentrum Karlsruhe GmbH, Karlsruhe (DE). Inst. fuer Technische Chemie, Bereich Thermische Abfallbehandlung (ITC-TAB)

    2008-07-01

    The emission limits of coal-fired power stations with a furnace thermal performance of more than 50 MW are regulated in the 13th Ordinance for the Implementation of the Federal Immission Control Act. The amended version of this regulation contains a limit value of 30 {mu}g/m{sup 3}. In order to examine the compliance of these limits particular in the case of substitute fuels by long-term measurements, suitable continuous measurement devices must be available. Under this aspect, the authors of the contribution under consideration report on a mercury monitor in the hard coal power station. Hg-CEM measurements are accomplished with concentrations up to 800 mg/m{sup 3} sulphure dioxide. The experimental concentrations of mercury in the raw gas correlate with the computed concentration. In a coal-fired power station, a failure-free operation of the Hg-CEM to the flue gas desulphurisation plant could be realized over four months.

  7. Research report for fiscal 1998. Basic research for promoting joint implementation, etc. (conversion of old coal-fired thermoelectric power plants in Poland into combined cycle plants); 1998 nendo chosa hokokusho. Poland sekitan karyoku hatsudensho (kyushiki) combined cycle eno tenkan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    A project is discussed for modernization for energy efficiency enhancement and greenhouse gas reduction. The most effective way to reduce greenhouse gas in Poland is to totally replace the existing coal-fired power plants with natural gas combined cycle plants. Under this project, however, natural gas-fired power generation and integrated coal/brown coal gasification combined cycle power generation are both subjected to study. This is because the power plant modernization project is closely related to the fate of coal/brown coal industries which constitute the important industrial department of Poland. As for the earning rate of the project in case of natural gas-fired combined cycle power generation, the rate will be 13.2% even at the Kaweczyn station which is the highest in earning rate, and this fails to satisfy the project conditions. If integrated coal/brown gasification combined cycle power generation is chosen, the rate will be still lower. When the cost for greenhouse gas reduction is taken up, the Konin station exhibits the lowest of 9 dollars/tCO2, and the others 15-17 dollars/tCO2. When coal gas combined cycle is employed, the cost will be 3-4 times higher. (NEDO)

  8. Life Cycle Assessment of Coal-fired Power Production

    Energy Technology Data Exchange (ETDEWEB)

    Spath, P. L.; Mann, M. K.; Kerr, D. R.

    1999-09-01

    Coal has the largest share of utility power generation in the US, accounting for approximately 56% of all utility-produced electricity (US DOE, 1998). Therefore, understanding the environmental implications of producing electricity from coal is an important component of any plan to reduce total emissions and resource consumption. A life cycle assessment (LCA) on the production of electricity from coal was performed in order to examine the environmental aspects of current and future pulverized coal boiler systems. Three systems were examined: (1) a plant that represents the average emissions and efficiency of currently operating coal-fired power plants in the US (this tells us about the status quo), (2) a new coal-fired power plant that meets the New Source Performance Standards (NSPS), and (3) a highly advanced coal-fired power plant utilizing a low emission boiler system (LEBS).

  9. A computerized event and maintenance data system at Loviisa nuclear power plant

    International Nuclear Information System (INIS)

    Jankala, K.E.; Saarelainen, P.; Vaurio, J.K.

    1993-01-01

    An on-line failure and maintenance event data system (which is a part of the Loviisa power plant information system) is described as developed and implemented at the Loviisa power plant. The system has been in operation since 1989, and the data base now covers more than 10 years of operation. The system contains a complete unavailability history, i.e. failures, repairs, replacements, scheduled or unscheduled preventive maintenance and periodic testing or service actions for any component that is relevant to plant safety, risk or economic production. The data base provides useful feedback from operating experience and can support e.g. studies on optimal maintenance and testing, planning of spare parts inventory and repair resources, updating of reliability parameters for risk studies, etc. (Z.S.) 4 refs

  10. Nuclear reactor component populations, reliability data bases, and their relationship to failure rate estimation and uncertainty analysis

    International Nuclear Information System (INIS)

    Martz, H.F.; Beckman, R.J.

    1981-12-01

    Probabilistic risk analyses are used to assess the risks inherent in the operation of existing and proposed nuclear power reactors. In performing such risk analyses the failure rates of various components which are used in a variety of reactor systems must be estimated. These failure rate estimates serve as input to fault trees and event trees used in the analyses. Component failure rate estimation is often based on relevant field failure data from different reliability data sources such as LERs, NPRDS, and the In-Plant Data Program. Various statistical data analysis and estimation methods have been proposed over the years to provide the required estimates of the component failure rates. This report discusses the basis and extent to which statistical methods can be used to obtain component failure rate estimates. The report is expository in nature and focuses on the general philosophical basis for such statistical methods. Various terms and concepts are defined and illustrated by means of numerous simple examples

  11. Enrichment of naturally occurring radionuclides and trace elements in Yatagan and Yenikoy coal-fired thermal power plants, Turkey.

    Science.gov (United States)

    Ozden, Banu; Guler, Erkan; Vaasma, Taavi; Horvath, Maria; Kiisk, Madis; Kovacs, Tibor

    2018-08-01

    Coal, residues and waste produced by the combustion of the coal contain naturally occurring radionuclides such as 238 U, 226 Ra, 210 Pb, 232 Th and 40 K and trace elements such as Cd, Cr, Pb, Ni and Zn. In this work, coal and its combustion residues collected from Yatagan and Yenikoy coal fired thermal power plants (CPPs) in Turkey were studied to determine the concentrations of natural radionuclides and trace elements, and their enrichments factors to better understand the radionuclide concentration processes within the combustion system. In addition, the utilization of coal fly ash as a secondary raw material in building industry was also studied in terms of radiological aspects. Fly ash samples were taken at different stages along the emission control system of the thermal power plants. Activity concentrations of naturally occurring radionuclides were determined with Canberra Broad Energy Germanium (BEGe) detector BE3830-P and ORTEC Soloist PIPS type semiconductor detector. The particle size distribution and trace elements contents were determined in various ash fractions by the laser scattering particle size distribution analyzer and inductively coupled plasma (ICP-OES). From the obtained data, natural radionuclides tend to condense on fly ash with and the activity concentrations increase as the temperature drop in CPPs. Measured 210 Pb and 210 Po concentration varied between 186 ± 20-1153 ± 44 Bq kg -1 , and 56 ± 5-1174 ± 45 Bq kg -1 , respectively. The highest 210 Pb and 210 Po activity concentrations were determined in fly ash taken from the temporary storage point as 1153 ± 44 Bq kg -1 and 1174 ± 45 Bq kg -1 , respectively. There were significant differences in the activity concentrations of some natural radionuclide and trace elements (Pb and Zn) contents in ash fractions among the sampling point inside both of the plants (ANOVA, p ash sample analysis showed an increase activity concentration and enrichment factors towards the

  12. Simple bounds for counting processes with monotone rate of occurrence of failures

    International Nuclear Information System (INIS)

    Kaminskiy, Mark P.

    2007-01-01

    The article discusses some aspects of analogy between certain classes of distributions used as models for time to failure of nonrepairable objects, and the counting processes used as models for failure process for repairable objects. The notion of quantiles for the counting processes with strictly increasing cumulative intensity function is introduced. The classes of counting processes with increasing (decreasing) rate of occurrence of failures are considered. For these classes, the useful nonparametric bounds for cumulative intensity function based on one known quantile are obtained. These bounds, which can be used for repairable objects, are similar to the bounds introduced by Barlow and Marshall [Barlow, R. Marshall, A. Bounds for distributions with monotone hazard rate, I and II. Ann Math Stat 1964; 35: 1234-74] for IFRA (DFRA) time to failure distributions applicable to nonrepairable objects

  13. Failure Investigation of a Cage Suspension Gear Chain used in Coal Mines

    Science.gov (United States)

    Ghosh, Debashis; Dutta, Shamik; Shukla, Awdhesh Kumar; Roy, Himadri

    2016-10-01

    This investigation is primarily aimed to examine the probable causes of in-service failure of cage suspension gear chain used in coal mines. Preliminary visual examination, dimensional measurement, chemical analysis, magnetic particle inspection and estimation of mechanical properties are necessary supplement to this investigation. Optical microscopic analysis along with scanning electron microscopy examinations are carried out to understand the metallurgical reasons for failure. The visual examination and magnetic particle investigations reveal presence of fissure cracks at weld joint for both un-failed and failed end link chain. The average hardness value has been found to increase gradually with the distance from the weld interface. The macro and microstructural examinations of the samples prepared from both failed and un-failed specimens depict presence of continuous as well as aligned linear inclusions randomly distributed along with decarburized layer at weld interface/fusion zone. Fractographic examination shows flat fracture covering major portion of cross-section, which is surrounded by a narrow annular metallic fracture surface having a texture different from that of the remaining surface. Fracture mechanics principles have been used to study the fatigue crack growth rate in both weld region and base region of the un-failed gear chain material. Detailed stress analyses are also carried out to evaluate the stress generated along the chain periphery. Finally, it is concluded that presence of serious weld defect due to use of improper welding parameters/procedure caused failure of the end links of the investigated chain link.

  14. Overview of catastrophic failures of freewheeling diodes in power electronic circuits

    DEFF Research Database (Denmark)

    Wu, Rui; Blaabjerg, Frede; Wang, Huai

    2013-01-01

    Emerging applications (e.g. electric vehicles, renewable energy systems, more electric aircrafts, etc.) have brought more stringent reliability constrains into power electronic products because of safety requirements and maintenance cost issues. To improve the reliability of power electronics......, better understanding of failure modes and failure mechanisms of reliability–critical components in power electronic circuits are needed. Many efforts have been devoted to the reduction of IGBT failures, while the study on the failures of freewheeling diodes is less impressive. It is of importance...... to investigate the catastrophic failures of freewheeling diodes as they could induce the malfunction of other components and eventually the whole power electronic circuits. This paper presents an overview of those catastrophic failures and gives examples of the corresponding consequences to the circuits....

  15. Operational experiences of (in)direct co-combustion in coal and gas fired power plants in Europe

    International Nuclear Information System (INIS)

    Van Ree, R.; Korbee, R.; Meijer, R.; Konings, T.; Van Aart, F.

    2001-02-01

    The operational experiences of direct and indirect co-combustion of biomass/waste in European coal and natural gas fired power plants are addressed. The operational experiences of mainly Dutch direct co-combustion activities in coal fired power plants are discussed; whereas an overview of European indirect co-combustion activities is presented. The technical, environmental, and economic feasibility of different indirect co-combustion concepts (i.e. upstream gasification, pyrolysis, combustion with steam-side integration) is investigated, and the results are compared with the economic preferable concept of direct co-combustion. Main technical constraints that limit the co-combustion capacity of biomass/waste in conventional coal fired power plants are: the grindability of the biomass/coal blend, the capacity of available unit components, and the danger of severe slagging, fouling, corrosion and erosion. The main environmental constraints that have to be taken into account are the quality of produced solid waste streams (fly ash, bottom ash, gypsum) and the applicable air emission regulations. 6 refs

  16. An estimation method of system failure frequency using both structure and component failure data

    International Nuclear Information System (INIS)

    Takaragi, Kazuo; Sasaki, Ryoichi; Shingai, Sadanori; Tominaga, Kenji

    1981-01-01

    In recent years, the importance of reliability analysis is appreciated for large systems such as nuclear power plants. A reliability analysis method is described for a whole system, using structure failure data for its main working subsystem and component failure data for its safety protection subsystem. The subsystem named main working system operates normally, and the subsystem named safety protection system acts as standby or protection. Thus the main and the protection systems are given mutually different failure data; then, between the subsystems, there exists common mode failure, i.e. the component failure affecting the reliability of both two. A calculation formula for sytem failure frequency is first derived. Then, a calculation method with digraphs is proposed for conditional system failure probability. Finally the results of numerical calculation are given for the purpose of explanation. (J.P.N.)

  17. Identification of the human factors contributing to maintenance failures in a petroleum operation.

    Science.gov (United States)

    Antonovsky, Ari; Pollock, Clare; Straker, Leon

    2014-03-01

    This research aimed to identify the most frequently occurring human factors contributing to maintenance-related failures within a petroleum industry organization. Commonality between failures will assist in understanding reliability in maintenance processes, thereby preventing accidents in high-hazard domains. Methods exist for understanding the human factors contributing to accidents. Their application in a maintenance context mainly has been advanced in aviation and nuclear power. Maintenance in the petroleum industry provides a different context for investigating the role that human factors play in influencing outcomes. It is therefore worth investigating the contributing human factors to improve our understanding of both human factors in reliability and the factors specific to this domain. Detailed analyses were conducted of maintenance-related failures (N = 38) in a petroleum company using structured interviews with maintenance technicians. The interview structure was based on the Human Factor Investigation Tool (HFIT), which in turn was based on Rasmussen's model of human malfunction. A mean of 9.5 factors per incident was identified across the cases investigated.The three most frequent human factors contributing to the maintenance failures were found to be assumption (79% of cases), design and maintenance (71%), and communication (66%). HFIT proved to be a useful instrument for identifying the pattern of human factors that recurred most frequently in maintenance-related failures. The high frequency of failures attributed to assumptions and communication demonstrated the importance of problem-solving abilities and organizational communication in a domain where maintenance personnel have a high degree of autonomy and a wide geographical distribution.

  18. On a method of evaluation of failure rate of equipment and pipings under excess-earthquake loadings

    International Nuclear Information System (INIS)

    Shibata, H.; Okamura, H.

    1979-01-01

    This paper deals with a method of evaluation of the failure rate of equipment and pipings in nuclear power plants under an earthquake which is exceeding the design basis earthquake. If we put the ratio of the maximum ground acceleration of an earthquake to that of the design basis earthquake as n, then the failure rate or the probability of failure is the function of n as p(n). The purpose of this study is establishing the procedure of evaluation of the relation n vs. p(n). (orig.)

  19. Environmental impact assessment of coal power plants in operation

    OpenAIRE

    Bartan Ayfer; Kucukali Serhat; Ar Irfan

    2017-01-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly as...

  20. Fiscal 1998 research report. Feasibility study on improvement of the thermal efficiency of existing coal- fired thermal power plants in China; 1998 nendo chosa hokokusho. Chugoku kisetsu sekitan karyoku hatsudensho koritsu kojo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the improvement project of the thermal efficiency of existing coal-fired thermal power plants in China to relate it to Japanese clean development mechanism. General study was made on the facility and operation of existing 300MW coal-fired thermal power plant units, and on-site study was also made on improvement of the thermal efficiency of some typical power plants. Based on these studies, effective improvement measures were identified, and general evaluation was carried out based on a cost effectiveness. The study result showed that the total efficiency improvement measures improve the plant efficiency of a standard 300MW unit by nearly 4%, and reduce CO{sub 2} emission by 184 ktons/y. The efficiency improvement measures for 10 300MW units by 2010 are estimated to reduce CO{sub 2} emission by 1.84 Mtons/y in 2010. This reduced emission is equivalent to annual emission of one 300MW unit. This project is reasonable enough if the cooperation range between Japan and the other country, and a source of funds are clarified. (NEDO)

  1. Integrated strategy for N-methylformanilide production from carbon dioxide of flue gas in coal-fired power plant

    International Nuclear Information System (INIS)

    Han, Jeehoon

    2017-01-01

    Highlights: • A ‘green’ N-methylformanilide production process based new carbon dioxide conversion technologies is developed. • Monoethanolamine-based system for capturing carbon dioxide from the flue gas of a coal-fired power plant is deployed. • Gamma-valerolactone is used a solvent and catalyst for converting carbon dioxide to N-methylformanilide. • New separations for recovery of N-methylformanilide and gamma-valerolactone are developed. • Economic evaluation of the proposed process is performed. - Abstract: In this work, an integrated strategy is developed for producing N-methylformanilide from the carbon dioxide of flue gas in a coal-fired power plant. Based on lab-scale experimental studies presenting maximum yields (96%) with low reaction concentrations (below 25 wt% reactants) using large volumes of gamma-valerolactone as a solvent and catalyst, the integrated strategy focuses on the development of commercial-scale processes that consist of a monoethanolamine-based carbon dioxide separation subsystem and a catalytic conversion subsystem of N-Methylaniline with carbon dioxide to N-methylformanilide. Moreover, a heat exchanger network is designed to minimize the total energy requirements by transferring the heat between subsystems. In the proposed integrated strategy, the energy efficiency after heat integration (77.5%) is higher than that before heat integration (74.5%). Economic analysis results show that the minimum selling price of N-methylformanilide ($1592.1 Mt"−"1 using the best possible parameters) for use in this integrated strategy is cost-competitive with the current market price ($2984 Mt"−"1).

  2. Recent Operating Experience involving Power Electronics Failure in Korea Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Jaedo

    2015-01-01

    Recently, modern power electronics devices for electrical component were steadily increased in electrical systems which used for main power control and protection. To upgrade the system reliability we recommended the redundancy for electrical equipment trip system. The past several years, Korean Nuclear power plants have changed the electrical control and protection systems (Auto Voltage Regulator, Power Protection Relay) for main generator and main power protection relay systems. In this paper we deal with operating experience involving modern solid state power electronics failure in Korean nuclear power plants. One of the failures we will discuss the degraded phenomenon of power electronics device for CEDMCS(Control Element Drive Mechanism Control System). As the result of the failure we concerned about the modification for trip source of main generator excitation systems and others. We present an interesting issue for modern solid state devices (IGBT, Thyristors). (authors)

  3. Analysis of unavailability related to demand failures as a function of the testing interval

    International Nuclear Information System (INIS)

    Carretero, J.A.; Pereira, M.B.; Perez Lobo, E.M.

    1998-01-01

    The unavailability related to the demand failure of a component is the sum of the contributions of the failures in demand and in waiting. An important point in PSAs is the calculation of unavailabilities of the basic events of demand failure. Several criteria are used for this, with the objective of simplifying said quantification. The information available from two nuclear power plants has been analysed, in order to determine the tendency in the models in demand and in waiting, as a function of the test intervals, the following conclusions were obtained: - There is a clear tendency for the possibility of failure in demand to increase as the interval between tests increases - The test intervals considered in PSAs are not always coherent with the estimates of real demand; this implies a penalty when using the in waiting model, due to the underlying conservatism Therefore, increasing the intervals between tests over time (a tendency studied in nuclear power plants)could cause demand due to tests to b e significantly less than that due to real actuations. This implies a need to apply test intervals based on historic demands and not on those due to historic tests, in order to avoid conservatism. (Author)

  4. High-resolution inventory of technologies, activities, and emissions of coal-fired power plants in China from 1990 to 2010

    Energy Technology Data Exchange (ETDEWEB)

    Liu, F.; Zheng, B.; He, K.B. [Tsinghua Univ., Beijing (China). State Key Joint Laboratory of Environment Simulation and Pollution Control; Zhang, Q. [Tsinghua Univ., Beijing (China). Ministry of Education Key Laboratory for Earth System Modeling; Tong, D.; Li, M. [Tsinghua Univ., Beijing (China). Ministry of Education Key Laboratory for Earth System Modeling; Tsinghua Univ., Beijing (China). State Key Joint Laboratory of Environment Simulation and Pollution Control; Huo, H. [Tsinghua Univ., Beijing (China). Inst. of Energy, Environment and Economy

    2015-07-01

    This paper, which focuses on emissions from China's coal-fired power plants during 1990-2010, is the second in a series of papers that aims to develop a high-resolution emission inventory for China. This is the first time that emissions from China's coal-fired power plants were estimated at unit level for a 20-year period. This inventory is constructed from a unit-based database compiled in this study, named the China coal-fired Power plant Emissions Database (CPED), which includes detailed information on the technologies, activity data, operation situation, emission factors, and locations of individual units and supplements with aggregated data where unit-based information is not available. Between 1990 and 2010, compared to a 479 % growth in coal consumption, emissions from China's coal-fired power plants increased by 56, 335, and 442 % for SO{sub 2}, NO{sub x}, and CO{sub 2}, respectively, and decreased by 23 and 27 % for PM{sub 2.5} and PM{sub 10} respectively. Driven by the accelerated economic growth, large power plants were constructed throughout the country after 2000, resulting in a dramatic growth in emissions. The growth trend of emissions has been effectively curbed since 2005 due to strengthened emission control measures including the installation of flue gas desulfurization (FGD) systems and the optimization of the generation fleet mix by promoting large units and decommissioning small ones. Compared to previous emission inventories, CPED significantly improved the spatial resolution and temporal profile of the power plant emission inventory in China by extensive use of underlying data at unit level. The new inventory developed in this study will enable a close examination of temporal and spatial variations of power plant emissions in China and will help to improve the performances of chemical transport models by providing more accurate emission data.

  5. PM1 particles at coal- and gas-fired power plant work areas.

    Science.gov (United States)

    Hicks, Jeffrey B; McCarthy, Sheila A; Mezei, Gabor; Sayes, Christie M

    2012-03-01

    With the increased interest in the possible adverse health effects attributed to inhalation of fine particle matter, this study was conducted to gather preliminary information about workplace exposures at coal- and gas-fired power plants to fine particles (PM(1); i.e. <1 μm) and ultrafine particles (i.e. <0.1 μm). Combustion of fossil fuel is known to produce fine particles, and due to their proximity and durations of exposure, power plant workers could be a group of individuals who experience high chronic exposures to these types of particles. The results of a series of real-time instrument measurements showed that concentrations of PM(1) were elevated in some locations in power plants. The highest concentrations were in locations near combustion sources, indicating that combustion materials were leaking from conventional fossil fuel-fired boilers or it was associated with emission plume downwash. Concentrations were the lowest inside air-conditioned control rooms where PM(1) were present at levels similar to or lower than upwind concentrations. Microscopic examinations indicate that PM(1) at the coal-fired plants are dominated by vitrified spheres, although there were also unusual elongated particles. Most of the PM(1) were attached to larger coal fly ash particles that may affect where and how they could be deposited in the lung.

  6. Preventive maintenance basis: Volume 24 -- Battery -- flooded lead-acid (lead-calcium, lead antimony, plante). Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. This document provides a program of preventive maintenance (PM) tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, system engineers, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  7. Failure rate of no-scalpel vasectomy in prevention of pregnancy in Shiraz, Southern Iran

    Directory of Open Access Journals (Sweden)

    S Shakeri

    2006-07-01

    Full Text Available BACKGROUND: Bilateral vasectomy is the most effective method of male contraception but there are still some reports on its failure. This study was undertaken to determine the failure rate of the no-scalpel vasectomy in Shiraz Vasectomy Center, Southern Iran. METHODS: From 2001 to 2003, 3900 no-scalpel vasectomies were done in Nader Kazemi Health Center. The records were studied for any failure in the method. Presence of any live sperm 6 months after surgery or any report of pregnancy post-vasectomy were considered as vasectomy failure. RESULTS:Among 3900 cases, 2928 patients had a complete follow up file while failure in the method was visible among 109 (3.72% cases. CONCLUSION: The low failure rate of no-scalpel method indicated its high efficacy to control the fertility in males but there is still need of performance by expert surgeons in well organized centers. KEYWORDS: Iran, no-scalpel vasectomy, failure rate.

  8. Preventive maintenance instrumentation results in Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Curiel, M.; Palomo, M. J.; Verdu, G.; Arnaldos, A.

    2010-10-01

    This paper is a recompilation of the most significance results in relation to the researching in preventive and predictive maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and the Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the power plants control and instrumentation department's technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the object to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish nuclear power plants each of them shall give a significant contribution to problem resolution and power plant performance. (Author)

  9. Industry perspectives on increasing the efficiency of coal-fired power generation

    Energy Technology Data Exchange (ETDEWEB)

    Torrens, I.M. [Shell Coal International, London (United Kingdom); Stenzel, W.C.

    1997-12-31

    Independent power producers will build a substantial fraction of expected new coal-fired power generation in developing countries over the coming decades. To reduce perceived risk and obtain financing for their projects, they are currently building and plan to continue to build subcritical coal-fired plants with generating efficiency below 40%. Up-to-date engineering assessment leads to the conclusion that supercritical generating technology, capable of efficiencies of up to 45%, can produce electricity at a lower total cost than conventional plants. If such plants were built in Asia over the coming decades, the savings in carbon dioxide emissions over their lifetime would be measured in billions of tons. IPPs perceive supercritical technology as riskier and higher cost than conventional technology. The truth needs to be confirmed by discussions with additional experienced power engineering companies. Better communication among the interested parties could help to overcome the IPP perception issue. Governments working together with industry might be able to identify creative financing arrangements which can encourage the use of more efficient pulverized clean coal technologies, while awaiting the commercialization of advanced clean coal technologies like gasification combined cycle and pressurized fluidized bed combustion.

  10. Investigation of pre-drying lignite in an existing Greek power plant

    Directory of Open Access Journals (Sweden)

    Agraniotis Michalis

    2012-01-01

    Full Text Available The application of lignite pre-drying technologies in next generation of lignite power plants by utilizing low pressure steam as a drying medium instead of hot recirculated flue gas - combined with thermal utilization of the vaporized coal moisture - is expected to bring efficiency increase of 2-4 percentage points in future lignite power plants compared with today’s state of the art. The pre-drying concept is of particular importance in Greek boilers firing lignite with a high water and ash content. The combustion of Greek predried lignite has been investigated experimentally and via numerical simulations in our previous research. This study focuses on the potential integration of a lignite pre-drying system in an existing Greek power plant with dry lignite co-firing thermal share of up to 30%. The radiative and convective heat fluxes to the boiler and the overall boiler heat balance is calculated for reference and dry lignite co-firing conditions by an in-house calculation code. The overall plant’s thermal cycle is then simulated using commercial thermal cycle calculation software. The net plant efficiency is in this way determined for reference and dry coal co-firing conditions. According to the simulation results the integration of a pre-drying system and the implementation of dry lignite co-firing may bring an efficiency increase of about 1.5 percentage points in existing Greek boilers. It is therefore considered as an important measure towards improving plant efficiency and reducing specific CO2 emissions in existing plants.

  11. A probabilistic method for optimization of fire safety in nuclear power plants

    International Nuclear Information System (INIS)

    Hosser, D.; Sprey, W.

    1986-01-01

    As part of a comprehensive fire safety study for German Nuclear Power Plants a probabilistic method for the analysis and optimization of fire safety has been developed. It follows the general line of the American fire hazard analysis, with more or less important modifications in detail. At first, fire event trees in selected critical plant areas are established taking into account active and passive fire protection measures and safety systems endangered by the fire. Failure models for fire protection measures and safety systems are formulated depending on common parameters like time after ignition and fire effects. These dependences are properly taken into account in the analysis of the fire event trees with the help of first-order system reliability theory. In addition to frequencies of fire-induced safety system failures relative weights of event paths, fire protection measures within these paths and parameters of the failure models are calculated as functions of time. Based on these information optimization of fire safety is achieved by modifying primarily event paths, fire protection measures and parameters with the greatest relative weights. This procedure is illustrated using as an example a German 1300 MW PWR reference plant. It is shown that the recommended modifications also reduce the risk to plant personnel and fire damage

  12. Radiological impact from airborne routine discharges of Coal-Fired power plant

    International Nuclear Information System (INIS)

    Norasalwa Zakaria; Rohyiza Baan; Kathiravale, Sivapalan

    2010-01-01

    Radioactivity exists everywhere in nature. We are exposed to intense and continuous natural radiation coming from the sun, cosmic radiation, telluric radiation and even to the internal radiation of our own body. The fly ash emitted from burning coal for electricity by a power plant carries into the surrounding environment 100 times more radiation than a nuclear power plant producing the same amount of energy. This paper presents the information of studies on the radiological impact from airborne routine discharge of coal-fired power plants. (author)

  13. Failure rates in piping manufactured to different standards

    International Nuclear Information System (INIS)

    Barnes, R.W.; Cooper, G.D.

    1995-11-01

    Most non-nuclear process piping systems in Canada and the United States are constructed to the requirements of the piping codes of the American Society of Mechanical Engineers (ASME B31.1 and B31.3). Section III of the ASME Boiler and Pressure Vessel Code, has additional requirements for piping that are expected to provide further assurance of pressure boundary integrity. This project attempted to determine if the additional requirements of Section III were beneficial in preventing failure of the pressure boundary. The approach taken in the study was to determine the causes of failure of non-nuclear piping subjected to service similar to that experienced by piping in CANDU nuclear power plants. The study examined information on carbon steel piping systems filled with water/steam which operate up to a maximum temperature of 600 F and a maximum pressure of 1600 psi. The failure mechanisms were identified and analysed to determine whether application of the requirements of Section III would have prevented the failure. Through a process of interviews and literature search, 186 failures were identified and assembled into a reference database. Many of the records were incomplete; therefore, the reference database was trimmed to include a subset of 65 failure points supported by complete data. This subset formed the basis for this study. The results from the study of other databases assembled for similar purposes were reviewed and compared to the conclusions reached in this study. These reviews confirmed the conclusions reached in this study. (author). 48 refs., 20 tabs

  14. Influence of stress triaxiality and strain rate on the failure behavior of a dual-phase DP780 steel

    International Nuclear Information System (INIS)

    Anderson, D.; Winkler, S.; Bardelcik, A.; Worswick, M.J.

    2014-01-01

    Highlights: • DP780 steel sheet sensitive to strain rate and triaxiality. • Specimens failed due to ductile-shear mode. • Extent of transverse cracking due to martensitic islands increased with triaxiality. • Uniaxial stress decreased with strain rate then increased after 0.1 s −1 . • Predicted effective plastic strain, triaxiality at failure increased with strain rate. - Abstract: To better understand the in-service mechanical behavior of advanced high-strength steels, the influence of stress triaxiality and strain rate on the failure behavior of a dual-phase (DP) 780 steel sheet was investigated. Three flat, notched mini-tensile geometries with varying notch severities and initial stress triaxialities of 0.36, 0.45, and 0.74 were considered in the experiments. Miniature specimens were adopted to facilitate high strain rate testing in addition to quasi-static experiments. Tensile tests were conducted at strain rates of 0.001, 0.01, 0.1, 1, 10, and 100 s −1 for all three notched geometries and compared to mini-tensile uniaxial samples. Additional tests at a strain rate of 1500 s −1 were performed using a tensile split Hopkinson bar apparatus. The results showed that the stress–strain response of the DP780 steel exhibited mainly positive strain rate sensitivity for all geometries, with mild negative strain rate sensitivity up to 0.1 s −1 for the uniaxial specimens. The strain at failure was observed to decrease with strain rate at low strain rates of 0.001–0.1 s −1 ; however, it increased by 26% for an increase in strain rate from 0.1 to 1500 s −1 for the uniaxial condition. Initial triaxiality was found to have a significant negative impact on true failure strain with a decrease of 32% at the highest triaxiality compared to the uniaxial condition at a strain rate of 0.001 s −1 . High resolution scanning electron microscopy images of the failure surfaces revealed a dimpled surface while optical micrographs revealed shearing through the

  15. Mechanics of arterial subfailure with increasing loading rate.

    Science.gov (United States)

    Stemper, Brian D; Yoganandan, Narayan; Pintar, Frank A

    2007-01-01

    Arterial subfailure leads to delayed symptomatology and high morbidity and mortality rates, particularly for the thoracic aorta and carotid arteries. Although arterial injuries occur during high-velocity automotive collisions, previous studies of arterial subfailure focused on quasi-static loading. This investigation subjected aortic segments to increasing loading rates to quantify effects on elastic, subfailure, and ultimate vessel mechanics. Sixty-two specimens were axially distracted, and 92% demonstrated subfailure before ultimate failure. With increasing loading rate, stress at initial subfailure and ultimate failure significantly increased, and strain at initial subfailure and ultimate failure significantly decreased. Present results indicate increased susceptibility for arterial subfailure and/or dissection under higher-rate extension. According to the present results, automotive occupants are at greater risk of arterial injury under higher velocity impacts due to greater body segment motions in addition to decreased strain tolerance to subfailure and catastrophic failure.

  16. Thermal power plant operating regimes in future British power systems with increasing variable renewable penetration

    International Nuclear Information System (INIS)

    Edmunds, Ray; Davies, Lloyd; Deane, Paul; Pourkashanian, Mohamed

    2015-01-01

    Highlights: • This work investigates thermal power operating regimes in future power systems. • Gas plants have low utilisation in the scenarios considered. • Ramping intensity increases for gas plants and pumped storage. • Coal plants frequently operate at minimum stable levels and start-ups increase. • Grid emission intensity and total emission production remains substantial. - Abstract: This work investigates the operational requirements of thermal power plants in a number of potential future British power systems with increasing variable renewable penetration. The PLEXOS Integrated Energy Model has been used to develop the market models, with PLEXOS employing mixed integer programming to solve the unit commitment and economic dispatch problem, subject to a number of constraints. Initially, a model of the British power system was developed and validated. Subsequently, a 2020 test model was developed to analyse a number of future system structures with differing fuel and carbon prices and generation mixes. The study has found that in three of the four scenarios considered, the utilisation of gas power plants will be relatively low, but remains fundamental to the security of supply. Also, gas plants will be subject to more intense ramping. The findings have consequent implications for energy policy as expensive government interventions may be required to prevent early decommissioning of gas capacity, should the prevailing market conditions not guarantee revenue adequacy.

  17. Reliability data of fire protection equipment and features in German nuclear power plants

    International Nuclear Information System (INIS)

    Roewekamp, M.; Riekert, T.; Sehrbrock, W.

    1997-01-01

    In order to perform probabilistic fire safety analyses, a comprehensive data base is needed including physical characteristics of fire compartments and their inventory, fire occurrence frequencies, technical reliability data for all fire-related equipment, human actions and human error probabilities, etc. In order to provide updated and realistic reliability data, the operational behaviour of different fire protection features in two German nuclear power plants was analysed in the framework of the study presented here. The analyses are based on the examination of reported results of the regular inspection and maintenance programs for nuclear power plants. Besides a plant specific assessment of the reliability data a generic assessment for an application as input data for fault tree analyses in the framework of probabilistic risk studies for other German plants was carried out. The analyses of failures and unavailabilities gave the impression that most of them are single failures without relevance for the plant safety. The data gained from NPPs were compared to reliability data of the German insurance companies for the same protection features installed in non-nuclear installations and to older nuclear specific reliability data. This comparison showed up a higher reliability. (orig.) [de

  18. Seismically induced common cause failures in PSA of nuclear power plants

    International Nuclear Information System (INIS)

    Ravindra, M.K.; Johnson, J.J.

    1991-01-01

    In this paper, a research project on the seismically induced common cause failures in nuclear power plants performed for Toshiba Corp. is described. The objective of this research was to develop the procedure for estimating the common cause failure probabilities of different nuclear power plant components using the combination of seismic experience data, the review of sources of dependency, sensitivity studies and engineering judgement. The research project consisted of three tasks: the investigation of damage instances in past earthquakes, the analysis of multiple failures and their root causes, and the development of the methodology for assessing seismically induced common cause failures. The details of these tasks are explained. In this paper, the works carried out in the third task are described. A methodology for treating common cause failures and the correlation between component failures is formulated; it highlights the modeling of event trees taking into account common cause failures and the development of fault trees considering the correlation between component failures. The overview of seismic PSA, the quantification methods for dependent failures and Latin Hypercube sampling method are described. (K.I.)

  19. Comparison of electricity production costs of nuclear and coal-fired power plants

    International Nuclear Information System (INIS)

    Peltzer, M.

    1980-01-01

    Electricity production costs of nuclear and coal-fired power plants their structure and future development are calculated and compared. Assumed beginning of operation is in the mid-1980. The technical and economical data are based on a nuclear power unit of 1 300 MW and on a coal-fired twin plant of 2 x 750 MW. The study describes and discusses the calculational method and the results. The costs for the electricity generation show an economic advantage for nuclear power. A sensitivity analysis shows that these results are valid also for changed input parameters. (orig.) [de

  20. Maintenance Tools applied to Electric Generators to Improve Energy Efficiency and Power Quality of Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Milton Fonseca Junior

    2017-07-01

    Full Text Available This paper presents a specific method to improve the reliability of the equipment and the quality of power supplied to the electrical systems with the frequency and voltage control of a thermoelectric plant, to guarantee a more stable system. The method has the novelty of combining Total Productive Maintenance (TPM using only four pillars, with Electrical Predictive Maintenance based in failure analysis and diagnostic. It prevents voltage drops caused by excessive reactive consumption, thus guaranteeing the company a perfect functioning of its equipment and providing a longer life of them. The Maintenance Management Program (MMP seeks to prevent failures from causing the equipment to be shut down from the electrical system, which means large financial losses, either by reducing billing or by paying fines to the regulatory agency, in addition to prejudice the reliability of the system. Using management tools, but applying only four TPM pillars, it was possible to achieve innovation in power plants with internal combustion engines. This study aims to provide maintenance with a more reliable process, through the implantation of measurement, control and diagnostic devices, thus allowing the management to reduce breakdown of plant equipment. Some results have been achieved after the implementation, such as reduction of annual maintenance cost, reduction of corrective maintenance, increase of MTBF (Mean Time between Failures and reduction of MTTR (Mean Time to Repair in all areas. Probabilistic models able to describe real processes in a more realistic way, and facilitate the optimization at maximum reliability or minimum costs are presented. Such results are reflected in more reliable and continual power generation.

  1. Techno-Economic Analysis of Integration of Low-Temperature Geothermal Resources for Coal-Fired Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Bearden, Mark D.; Davidson, Casie L.; Horner, Jacob A.; Heldebrant, David J.; Freeman, Charles J.

    2016-05-11

    Presented here are the results of a techno-economic (TEA) study of the potential for coupling low-grade geothermal resources to boost the electrical output from coal-fired power plants. This study includes identification of candidate 500 MW subcritical coal-fired power plants in the continental United States, followed by down-selection and characterization of the North Valmy generating station, a Nevada coal-fired plant. Based on site and plant characteristics, ASPEN Plus models were designed to evaluate options to integrate geothermal resources directly into existing processes at North Valmy. Energy outputs and capital costing are presented for numerous hybrid strategies, including integration with Organic Rankine Cycles (ORCs), which currently represent the primary technology for baseload geothermal power generation.

  2. Literature study regarding fire protection in nuclear power plants. Part I: Fire rated separations

    International Nuclear Information System (INIS)

    Isaksson, S.

    1995-06-01

    This literature study has been made on behalf of the Swedish Nuclear Power Inspectorate. The aim is to describe different aspects of fire protection in nuclear power plants. Conventional building codes can not give guidance on where to make fire rated separations in order to separate redundant trains of safety systems. The separation must originate in functional demands from the authorities on what functions are essential during and after a fire, and under what circumstances these functions shall be retained, i.e. the number of independent faults and initiating events. As a basic demand it is suggested to rate the strength of separations according to conventional building code, based on fire load. The whole separating construction shall have the same fire rating, including the ventilation system. Deviations from the basic demand can de done in case it can be proven that it is possible to compensate some or all of the fire rating with other measures. There is a general lack of statistical information regarding the reliability of fire separating constructions such as walls, fire doors, penetration seals and fire dampers. The amount of cables penetrating a seal is in many cases much higher in real installations than what has been tested for type approval. It would therefore be valuable to perform a furnace test with a more representative amount of cables passing through a penetration seal. Tests have shown that the 20 foot horizontal separation distance stipulated by NRC is not a guarantee against fire damage. Spatial separations based on general requirements shall not be allowed, but considered from case to case based on actual circumstances. For fire protection by isolation or coatings, it is of great importance to choose the method of protection carefully, to be compatible with the material it shall be applied on, and the environment and types of fire that may occur. 48 refs, 2 figs, 5 tabs

  3. Optimizing preventive maintenance policy: A data-driven application for a light rail braking system.

    Science.gov (United States)

    Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel

    2017-10-01

    This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions.

  4. Parameter Estimation of a Reliability Model of Demand-Caused and Standby-Related Failures of Safety Components Exposed to Degradation by Demand Stress and Ageing That Undergo Imperfect Maintenance

    Directory of Open Access Journals (Sweden)

    S. Martorell

    2017-01-01

    Full Text Available One can find many reliability, availability, and maintainability (RAM models proposed in the literature. However, such models become more complex day after day, as there is an attempt to capture equipment performance in a more realistic way, such as, explicitly addressing the effect of component ageing and degradation, surveillance activities, and corrective and preventive maintenance policies. Then, there is a need to fit the best model to real data by estimating the model parameters using an appropriate tool. This problem is not easy to solve in some cases since the number of parameters is large and the available data is scarce. This paper considers two main failure models commonly adopted to represent the probability of failure on demand (PFD of safety equipment: (1 by demand-caused and (2 standby-related failures. It proposes a maximum likelihood estimation (MLE approach for parameter estimation of a reliability model of demand-caused and standby-related failures of safety components exposed to degradation by demand stress and ageing that undergo imperfect maintenance. The case study considers real failure, test, and maintenance data for a typical motor-operated valve in a nuclear power plant. The results of the parameters estimation and the adoption of the best model are discussed.

  5. Failure data collection from a Swedish nuclear power plant

    International Nuclear Information System (INIS)

    Andersson, B.; Bhattacharyya, A.; Hilding, S.

    1975-01-01

    The Swedish nuclear utilities have formed a joint working group in the field of reliability data of thermal power plants, nuclear and fossil fuelled. The primary task of the working group is to create a standard procedure of collecting failure data from the Swedish nuclear power plants in operation. The failure data will be stored in a joint data bank. A first test collection of such data has been implemented on Oskarshamn I, and the experience with this work is discussed in this report. Reliability analysis of an engineering system is based on the availability of pertinent information on the system components. Right from the beginning within the Swedish nuclear industry the consensus has been that such data can be suitably obtained by monitoring the operating power stations. This has led to a co-operative arrangement between the vendor, ASEA-ATOM and a utility, Oskarshamnsverkets Kraftgrupp AB (OKG) to utilize information from component malfunctions in the reliability analysis. The utility prepares component failure reports which are sent to the vendor for further treatment. Experience gathered to date indicates that this arrangement is effective although many persons are involved in this process of information transmittal. The present set-up is flexible enough to accommodate necessary changes in view of problems which arise now and then in monitoring a complex system like a nuclear power station. This report briefly describes the structure of the failure data collection system. The way in which the raw data collection is done in the station by the owner and the subsequent data processing by the vendor is discussed. A brief status report of the information collected since 1971 is given. It can be concluded that valuable reliability data can be obtained by monitoring component failure reports from an operating power plant. Two requirements are, however, that all the parties involved in the arrangement follow given instructions carefully and that the assumed

  6. Mechanistic considerations used in the development of the probability of failure in transient increases in power (PROFIT) pellet-zircaloy cladding (thermo-mechanical-chemical) interactions (pci) fuel failure model

    International Nuclear Information System (INIS)

    Pankaskie, P.J.

    1980-05-01

    A fuel Pellet-Zircaloy Cladding (thermo-mechanical-chemical) interactions (PCI) failure model for estimating the Probability of Failure in Transient Increases in Power (PROFIT) was developed. PROFIT is based on (1) standard statistical methods applied to available PCI fuel failure data and (2) a mechanistic analysis of the environmental and strain-rate-dependent stress versus strain characteristics of Zircaloy cladding. The statistical analysis of fuel failures attributable to PCI suggested that parameters in addition to power, transient increase in power, and burnup are needed to define PCI fuel failures in terms of probability estimates with known confidence limits. The PROFIT model, therefore, introduces an environmental and strain-rate dependent Strain Energy Absorption to Failure (SEAF) concept to account for the stress versus strain anomalies attributable to interstitial-dislocation interaction effects in the Zircaloy cladding

  7. Spatial Distribution and Trend of CH4, NO2, CO and Ozone during 2003-2015 over Coal Fired Power Plants in US

    Science.gov (United States)

    de Azevedo, S. C.; Reyes, C.; Singh, R. P.

    2016-12-01

    Coal fired power plants are the sources of atmospheric pollution and poor air quality in many parts of the world especially in India and China. The greenhouse emissions from the coal fired power plants are considered as threat to the climate and human health. About 572 coal fired power plants (up to 2012) are operational, especially in the mid and eastern parts of US. We have analyzed satellite measured carbon monoxide (CO), methane (CH4), nitrogen dioxide (NO2), ozone (O3) and meteorological parameters for the period 2003-2015. In this study, we have considered 30 power plants, covering 10 x10surrounding area and over 11 regions of US in a grid of about 50 x50 to 60 x60. In general, most of the coal fired power plants show a decreasing trend of CO, whereas NO2 follow a similar trend over the power plants located in the eastern parts. Our analysis shows that the clean air act is strictly followed by the coal fired power plants in the eastern US compared to power plants located in the mid and western parts. The CH4 concentrations over the eastern parts show higher concentrations compared to mid and western regions in the period 2003-2015. Higher concentrations and seasonal variability of greenhouse gases is dependent on the prevailing meteorological conditions.

  8. PCB transformer fires: the risk in nuclear power plants

    International Nuclear Information System (INIS)

    Blackmon, K.

    1988-01-01

    It is estimated that 1/2 of the present nuclear power plants operate with PCB-filled transformer equipment. In an attempt to obtain better estimates of clean-up costs in a nuclear power plant under reasonable-loss scenarios, a study was commissioned. This study was a joint venture between Blackmon-Mooring Steamatic Technologies, Inc., (BMS-TECH) and M and M Protection Consultants. This joint study was conducted at a typical pressurized-water reactor plant consisting of two 1000-MW units. Three specific scenarios were selected and analyzed for this typical power plant. These scenarios were: (1) an electrical failure of a transformer in an isolated switch gear room; (2) a transformer exposed to a 55-gallon transient combustion oil fire in the auxiliary building; and (3) a PCB transformer involved in a major turbine lube fire in the turbine building. Based on results of this study, the insurance carriers for this industry implemented an adjustment in their rate structures for nuclear power plants that have PCB equipment

  9. Development of KSC program for investigating and generating field failure rates. Volume 2: Recommended format for reliability handbook for ground support equipment

    Science.gov (United States)

    Bloomquist, C. E.; Kallmeyer, R. H.

    1972-01-01

    Field failure rates and confidence factors are presented for 88 identifiable components of the ground support equipment at the John F. Kennedy Space Center. For most of these, supplementary information regarding failure mode and cause is tabulated. Complete reliability assessments are included for three systems, eight subsystems, and nine generic piece-part classifications. Procedures for updating or augmenting the reliability results presented in this handbook are also included.

  10. Preventive maintenance basis: Volume 31 -- Relays -- timing. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to timing relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  11. Preventive maintenance basis: Volume 30 -- Relays -- control. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to control relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  12. Advanced diagnostics and predictive maintenance to improve availability and reliability of ENEL plants

    Energy Technology Data Exchange (ETDEWEB)

    Cenci, V.; Ghironi, M.; Guidi, L.; Lauro, M.; Pestonesi, D. [ENEL (Italy). Generation and Energy Management Division

    2007-07-01

    This paper reviews the ENEL Generation and Energy Management strategy for diagnostics and predictive maintenance of power plants and provides a comprehensive description of effective applications and systems. Exploiting the most advanced information and communication technologies makes it possible to capture weak and hidden signals and powerful processing can be used to discover forewarning symptoms and identify anomalies both in the process and, above all, inside the devices. The following systems and applications are presented together with results and impact on plant profitability: expert system for the diagnostics of plant main machinery; advanced diagnostics of 'intelligent' fieldbus devices such as on/off valve motor-driven actuators, control-valve positioners and pneumatic actuators, transmitters; control loop and control valve diagnostics in order to investigate valve friction with an estimation of the residual time to failure; multisensorial diagnostics for coal transport and storage systems aimed at preventing firing and structural damages; and wireless sensor networks for the diagnostics of medium and small size components. 4 refs., 14 figs., 1 tab.

  13. Failure: A Source of Progress in Maintenance and Design

    Science.gov (United States)

    Chaïb, R.; Taleb, M.; Benidir, M.; Verzea, I.; Bellaouar, A.

    This approach, allows using the failure as a source of progress in maintenance and design to detect the most critical components in equipment, to determine the priority order maintenance actions to lead and direct the exploitation procedure towards the most penalizing links in this equipment, even define the necessary changes and recommendations for future improvement. Thus, appreciate the pathological behaviour of the material and increase its availability, even increase its lifespan and improve its future design. In this context and in the light of these points, the failures are important in managing the maintenance function. Indeed, it has become important to understand the phenomena of failure and degradation of equipments in order to establish an appropriate maintenance policy for the rational use of mechanical components and move to the practice of proactive maintenance [1], do maintenance at the design [2].

  14. Preventive maintenance instrumentation results in Spanish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Curiel, M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Palomo, M. J.; Verdu, G. [ISIRYM, Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain); Arnaldos, A., E-mail: m.curiel@lainsa.co [TITANIA Servicios Tecnologicos SL, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain)

    2010-10-15

    This paper is a recompilation of the most significance results in relation to the researching in preventive and predictive maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and the Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the power plants control and instrumentation department's technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the object to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish nuclear power plants each of them shall give a significant contribution to problem resolution and power plant performance. (Author)

  15. Emission of CO2 Gas and Radioactive Pollutant from Coal Fired Power Plant

    International Nuclear Information System (INIS)

    Ida, N.Finahari; Djati-HS; Heni-Susiati

    2006-01-01

    Energy utilization for power plant in Indonesia is still depending on burning fossil fuel such as coal, oil and gaseous fuel. The direct burning of coal produces CO 2 gas that can cause air pollution, and radioactive pollutant that can increase natural radioactive dosage. Natural radionuclide contained in coal is in the form of kalium, uranium, thorium and their decay products. The amount of CO 2 gas emission produced by coal fired power plant can be reduced by equipping the plant with waste-gas treatment facility. At this facility, CO 2 gas is reacted with calcium hydroxide producing calcium carbonate. Calcium carbonate then can be used as basic material in food, pharmaceutical and construction industries. The alternative method to reduce impact of air pollution is by replacing coal fuel with nuclear fuel or new and renewable fuel. (author)

  16. Non-greenhouse gas emissions from coal-fired power plants in China

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-04-15

    Within the Twelth Five-Year Plan, the Chinese Government has made addressing air quality problems a key environmental priority, with an intention to accelerate the development of systems, institutions and a technical knowledge base for sustained improvement. A major focus is on the coal power sector for which standards have been introduced that require the installation of modern, very high efficiency SO2, NOx and particulates emissions control systems. Nine key regions, which are facing very significant air quality challenges, are the three major economic zones around the cities of Beijing, Shanghai (Yangtze River Delta) and Guangzhou (Pearl River Delta), together with six areas around the cities of Shenyang, Changsha, Wuhan, Chengdu Chongqing, the Shandong peninsula, and the coastal area west of the Taiwan strait. These regions comprise the population and economic centres of the country, accounting for 64% of national GDP, 43% of total energy use, and 39% of the population. In these locations, all existing and new coal-fired power plants will have to achieve particulate, SO2 and NOx emissions limits of 20, 50 and 100 mg/m3 respectively, with new plants expected to meet the standards from 1 January 2012 and existing plants by 1 July 2014. At the same time, there will be an increasing emphasis on limiting any new coal-fired power plants in these regions. For the rest of the country, the standards are not quite so strict and the SO2 limits for existing plants are less severe than for new plants. The new pollutant that will be regulated on coal-fired power plants is mercury and its compounds, for which the limit has been set at a level that represents a core control. This means that providing the power plant operator meets the new particulate, SO2 and NOx standards then the mercury standard should be met without the need to introduce an additional capture device, although the emissions level will have to be measured on a regular basis. From a global perspective, this

  17. Optimal Level of Woody Biomass Co-Firing with Coal Power Plant Considering Advanced Feedstock Logistics System

    Directory of Open Access Journals (Sweden)

    Sangpil Ko

    2018-05-01

    Full Text Available Co-firing from woody biomass feedstock is one of the alternatives toward increased use of renewable feedstock in existing coal power plants. However, the economic level of co-firing at a particular power plant depends on several site-specific factors. Torrefaction has been identified recently as a promising biomass pretreatment option to lead to reduction of the feedstock delivered cost, and thus facilitate an increase in the co-firing ratio. In this study, a mixed integer linear program (MILP is developed to integrate supply chain of co-firing and torrefaction process and find the optimal level of biomass co-firing in terms of minimized transportation and logistics costs, with or without tax credits. A case study of 26 existing coal power plants in three Great Lakes States of the US is used to test the model. The results reveal that torrefaction process can lead to higher levels of co-firing, but without the tax credit, the effect is limited to the low capacity of power plants. The sensitivity analysis shows that co-firing ratio has higher sensitivity to variation in capital and operation costs of torrefaction than to the variation in the transportation and feedstock purchase costs.

  18. The level of air pollution in the impact zone of coal-fired power plant (Karaganda City) using the data of geochemical snow survey (Republic of Kazakhstan)

    Science.gov (United States)

    Adil'bayeva, T. E.; Talovskaya, A. V.; Yazikov, Ye G.; Matveenko, I. A.

    2016-09-01

    Coal-fired power plants emissions impact the air quality and human health. Of great significance is assessment of solid airborne particles emissions from those plants and distance of their transportation. The article presents the results of air pollution assessment in the zone of coal-fired power plant (Karaganda City) using snow survey. Based on the mass of solid airborne particles deposited in snow, time of their deposition on snow at the distance from 0.5 to 4.5 km a value of dust load has been determined. It is stated that very high level of pollution is observed at the distance from 0.5 to 1 km. there is a trend in decrease of dust burden value with the distance from the stacks of coal-fired power plant that may be conditioned by the particle size and washing out smaller ash particles by ice pellets forming at freezing water vapour in stacks of the coal-fired power plant. Study in composition of solid airborne particles deposited in snow has shown that they mainly contain particulates of underburnt coal, Al-Si- rich spheres, Fe-rich spheres, and coal dust. The content of the particles in samples decreases with the distance from the stacks of the coal-fired power plant.

  19. Local Impacts of Mercury Emissions from the Three Pennsylvania Coal Fired Power Plants.

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan,T.; Adams,J.; Bender, M.; Bu, C.; Piccolo, N.; Campbell, C.

    2008-02-01

    found the following: (1) There was some correlation between the prevailing wind direction and measured soil and oak leaf concentrations. This correlation was not statistically significant, but higher soil concentrations were generally found in the east and southeast from the plants and lower soil concentrations were found west/southwest from the plants. The prevailing winds are to the east. The Conemaugh plant which was the most southeast of the three plants did have the highest average oak leaf and soil mercury concentrations. Based on emissions, the Keystone plant would be expected to see the highest concentrations as it emitted about 25% more mercury than the other two plants. (2) The results of this study did not turn up strong evidence for large areas (several square miles) of elevated mercury concentrations around the three coal-fired power plants that were tested. This does not mean that there is no effect, there was some evidence of increasing mercury content to the east and south of these plants, however, the trends were not statistically significant suggesting that if the effects exist, they are small.

  20. Radiological Impact Associated to Technologically Enhanced Naturally Occurring Radioactive Materials (TENORM) from Coal-Fired Power Plants Emissions - 13436

    International Nuclear Information System (INIS)

    Dinis, Maria de Lurdes; Fiuza, Antonio; Soeiro de Carvalho, Jose; Gois, Joaquim; Meira Castro, Ana Cristina

    2013-01-01

    Certain materials used and produced in a wide range of non-nuclear industries contain enhanced activity concentrations of natural radionuclides. In particular, electricity production from coal is one of the major sources of increased human exposure to naturally occurring radioactive materials. A methodology was developed to assess the radiological impact due to natural radiation background. The developed research was applied to a specific case study, the Sines coal-fired power plant, located in the southwest coastline of Portugal. Gamma radiation measurements were carried out with two different instruments: a sodium iodide scintillation detector counter (SPP2 NF, Saphymo) and a gamma ray spectrometer with energy discrimination (Falcon 5000, Canberra). Two circular survey areas were defined within 20 km of the power plant. Forty relevant measurements points were established within the sampling area: 15 urban and 25 suburban locations. Additionally, ten more measurements points were defined, mostly at the 20-km area. The registered gamma radiation varies from 20 to 98.33 counts per seconds (c.p.s.) corresponding to an external gamma exposure rate variable between 87.70 and 431.19 nGy/h. The highest values were measured at locations near the power plant and those located in an area within the 6 and 20 km from the stacks. In situ gamma radiation measurements with energy discrimination identified natural emitting nuclides as well as their decay products (Pb-212, Pb-2142, Ra-226, Th-232, Ac-228, Th-234, Pa-234, U- 235, etc.). According to the results, an influence from the stacks emissions has been identified both qualitatively and quantitatively. The developed methodology accomplished the lack of data in what concerns to radiation rate in the vicinity of Sines coal-fired power plant and consequently the resulting exposure to the nearby population. (authors)

  1. Heavy metal atmospheric emissions from coal-fired power plants - Assessment and uncertainties

    International Nuclear Information System (INIS)

    Lecuyer, I.; Ungar, A.; Peter, H.; Karl, U.

    2004-01-01

    Power generation using fossil fuel combustion (coal and fuel-oil) participates, with other sectors, to heavy metal atmospheric emissions. The dispersion of these hazardous pollutants throughout the environment is more and more regulated. In order to assess the annual flows emitted from EDF coal-fired power plants, a computerized tool has been developed, based on the methodology defined by IFARE/DFIU in 1997. The heavy metal partition factors within the plant unit are determined according to the type of unit and the coal characteristics. Heavy metals output flows, and especially those emitted with flue gas at the stack, are then deduced from the actual coal consumption and chemical composition. A first inventory of heavy metal emissions from EDF coal-fired power plants has been achieved for year 2001. Values are accurate (± 40 %) for nonvolatile elements (Cr, Cu, Co, Mn, Ni, V) and for PM 10 and PM 2.5 (particulate matter below 10 μm and 2.5 μm). The uncertainty is higher (± 80 %) for volatile elements (As, Pb, Zn). Excess indicative values are given for elements which are both volatile and at low concentrations in coal (Hg, Se, Cd). (author)

  2. Study Improving Performance of Centrifugal Compressor In Paiton Coal Fired Power Plant Unit 1 And 2

    Science.gov (United States)

    Kusuma, Yuriadi; Permana, Dadang S.

    2018-03-01

    The compressed air system becomes part of a very important utility system in a Plant, including the Steam Power Plant. In PLN’S coal fired power plant, Paiton units 1 and 2, there are four Centrifugal air compressor types, which produce compressed air as much as 5.652 cfm and with electric power capacity of 1200 kW. Electricity consumption to operate centrifugal compressor is 7.104.117 kWh per year. This study aims to measure the performance of Centrifugal Compressors operating in Paiton’s coal fired power plant units 1 and 2. Performance Compressor is expressed by Specific Power Consumption (SPC) in kW/100 cfm. For this purpose, we measure the compressed air flow rate generated by each compressor and the power consumed by each compressor. The result is as follows Air Compressor SAC 2B : 15.1 kW/100 cfm, Air Compressor SAC 1B : 15.31 kW/100 cfm,Air Compressor SAC 1A : 16.3 kW/100 cfm and air Compressor SAC 2C : 18.19 kW/100 cfm. From the measurement result, air compressor SAC 2B has the best performance that is 15.1 kW / 100 cfm. In this study we analyze efforts to improve the performance of other compressors to at least match the performance of the SAC 2B air compressor. By increasing the Specific Power Consumption from others Compressor, it will get energy saving up to 284,165 kWh per year.

  3. An estimation of reactor thermal power uncertainty using UFM-based feedwater flow rate in nuclear power plants

    International Nuclear Information System (INIS)

    Byung Ryul Jung; Ho Cheol Jang; Byung Jin Lee; Se Jin Baik; Woo Hyun Jang

    2005-01-01

    Most of Pressurized Water Reactors (PWRs) utilize the venturi meters (VMs) to measure the feedwater (FW) flow rate to the steam generator in the calorimetric measurement, which is used in the reactor thermal power (RTP) estimation. However, measurement drifts have been experienced due to some anomalies on the venturi meter (generally called the venturi meter fouling). The VM's fouling tends to increase the measured pressure drop across the meter, which results in indication of increased feedwater flow rate. Finally, the reactor thermal power is overestimated and the actual reactor power is to be reduced to remain within the regulatory limits. To overcome this VM's fouling problem, the Ultrasonic Flow Meter (UFM) has recently been gaining attention in the measurement of the feedwater flow rate. This paper presents the applicability of a UFM based feedwater flow rate in the estimation of reactor thermal power uncertainty. The FW and RTP uncertainties are compared in terms of sensitivities between the VM- and UFM-based feedwater flow rates. Data from typical Optimized Power Reactor 1000 (OPR1000) plants are used to estimate the uncertainty. (authors)

  4. Pollution control technologies applied to coal-fired power plant operation

    Directory of Open Access Journals (Sweden)

    Maciej Rozpondek

    2009-09-01

    Full Text Available Burning of fossil fuels is the major source of energy in today's global economy with over one-third of the world's powergeneration derived from coal combustion. Although coal has been a reliable, abundant, and relatively inexpensive fuel source for mostof the 20th century, its future in electric power generation is under increasing pressure as environmental regulations become morestringent worldwide. Current pollution control technologies for combustion exhaust gas generally treat the release of regulatedpollutants: sulfur dioxide, nitrogen oxides and particulate matter as three separate problems instead of as parts of one problem. Newand improved technologies have greatly reduced the emissions produced per ton of burning coal. The term “Clean Coal CombustionTechnology” applies generically to a range of technologies designed to greatly reduce the emissions from coal-fired power plants.The wet methods of desulfurization at present are the widest applied technology in professional energetics. This method is economicand gives good final results but a future for clean technologies is the biomass. Power from biomass is a proven commercial optionof the electricity generation in the World. An increasing number of power marketers are starting to offer environmentally friendlyelectricity, including biomass power, in response to the consumer demand and regulatory requirements.

  5. Assessing the Greenhouse Gas Emissions from Natural Gas Fired Power Plants

    Science.gov (United States)

    Hajny, K. D.; Shepson, P. B.; Rudek, J.; Stirm, B. H.; Kaeser, R.; Stuff, A. A.

    2017-12-01

    Natural gas is often discussed as a "bridge fuel" to transition to renewable energy as it only produces 51% the amount of CO2 per unit energy as coal. This, coupled with rapid increases in production fueled by technological advances, has led to a near tripling of natural gas used for electricity generation since 2005. One concern with this idea of a "bridge fuel" is that methane, the primary component of natural gas, is itself a potent greenhouse gas with 28 and 84 times the global warming potential of CO2 based on mass over a 100 and 20 year period, respectively. Studies have estimated that leaks from the point of extraction to end use of 3.2% would offset the climate benefits of natural gas. Previous work from our group saw that 3 combined cycle power plants emitted unburned CH4 from the stacks and leaked additional CH4 from equipment on site, but total loss rates were still less than 2.2%. Using Purdue's Airborne Laboratory for Atmospheric Research (ALAR) we completed additional aircraft based mass balance experiments combined with passes directly over power plant stacks to expand on the previous study. In this work, we have measured at 12 additional natural gas fired power plants including a mix of operation types (baseload, peaking, intermediate) and firing methods (combined cycle, simple thermal, combustion turbine). We have also returned to the 3 plants previously sampled to reinvestigate emissions for each of those, to assess reproducibility of the results. Here we report the comparison of reported continuous emissions monitoring systems (CEMS) data for CO2 to our emission rates calculated from mass balance experiments, as well as a comparison of calculated CH4 emission rates to estimated emission rates based on the EPA emission factor of 1 g CH4/mmbtu natural gas and CEMS reported heat input. We will also discuss emissions from a coal-fired plant which has been sampled by the group in the past and has since converted to natural gas. Lastly, we discuss the

  6. Monetization of External Costs Using Lifecycle Analysis—A Comparative Case Study of Coal-Fired and Biomass Power Plants in Northeast China

    Directory of Open Access Journals (Sweden)

    Lingling Wang

    2015-02-01

    Full Text Available In this study, the structures of external costs are built in line with coal-fired and biomass power plant life cycle activities in Northeast China. The external cost of coal-fired and biomass power plants was compared, using the lifecycle approach. In addition, the external costs of a biomass power plant are calculated for each stage for comparison with those of a coal-fired power plant. The results highlight that the external costs of a coal-fired plant are 0.072 US $/kWh, which are much higher than that of a biomass power plant, 0.00012 US$/kWh. The external cost of coal-fired power generation is as much as 90% of the current price of electricity generated by coal, while the external cost of a biomass power plant is 1/1000 of the current price of electricity generated by biomass. In addition, for a biomass power plant, the external cost associated with SO2, NOX, and PM2.5 are particularly lower than those of a coal-fired power plant. The prospect of establishing precise estimations for external cost mechanisms and sustainable energy policies is discussed to show a possible direction for future energy schemes in China. The paper has significant value for supporting the biomass power industry and taxing or regulating coal-fired power industry to optimize the energy structure in China.

  7. Multi-objective optimization of coal-fired power plants using differential evolution

    International Nuclear Information System (INIS)

    Wang, Ligang; Yang, Yongping; Dong, Changqing; Morosuk, Tatiana; Tsatsaronis, George

    2014-01-01

    Highlights: • Multi-objective optimization of large-scale coal-fired power plants using differential evolution. • A newly-proposed algorithm for searching the fronts of decision space in a single run. • A reduction of cost of electricity by 2–4% with an optimal efficiency increase up to 2% points. • The uncertainty comes mainly from temperature- and reheat-related cost factors of steam generator. • An exergoeconomic analysis and comparison between optimal designs and one real industrial design. - Abstract: The design trade-offs between thermodynamics and economics for thermal systems can be studied with the aid of multi-objective optimization techniques. The investment costs usually increase with increasing thermodynamic performance of a system. In this paper, an enhanced differential evolution with diversity-preserving and density-adjusting mechanisms, and a newly-proposed algorithm for searching the decision space frontier in a single run were used, to conduct the multi-objective optimization of large-scale, supercritical coal-fired plants. The uncertainties associated with cost functions were discussed by analyzing the sensitivity of the decision space frontier to some significant parameters involved in cost functions. Comparisons made with the aid of an exergoeconomic analysis between the cost minimum designs and a real industrial design demonstrated how the plant improvement was achieved. It is concluded that the cost of electricity could be reduced by a 2–4%, whereas the efficiency could be increased by up to two percentage points. The largest uncertainty is introduced by the temperature-related and reheat-related cost coefficients of the steam generator. More reliable data on the price prediction of future advanced materials should be used to obtain more accurate fronts of the objective space

  8. Comprehensive assessment of toxic emissions from coal-fired power plants

    International Nuclear Information System (INIS)

    Brown, T.D.; Schmidt, C.E.; Radziwon, A.S.

    1991-01-01

    The Pittsburgh Energy Technology Center (PETC) of the US Department of Energy (DOE) has two current investigations, initiated before passage of the Clean Air Act Amendment (CAAA), that will determine the air toxic emissions from coal-fired electric utilities. DOE has contracted with Battelle Memorial Institute and Radian corporation to conduct studies focusing on the potential air toxics, both organic and inorganic, associated with different size fractions of fine particulate matter emitted from power plant stacks. Table 2 indicates the selected analytes to be investigated during these studies. PETC is also developing guidance on the monitoring of Hazardous Air Pollutants (HAPS) to be incorporated in the Environmental Monitoring plans for the demonstration projects in its Clean Coal Technology Program

  9. Modeling of Electrical Cable Failure in a Dynamic Assessment of Fire Risk

    Science.gov (United States)

    Bucknor, Matthew D.

    Fires at a nuclear power plant are a safety concern because of their potential to defeat the redundant safety features that provide a high level of assurance of the ability to safely shutdown the plant. One of the added complexities of providing protection against fires is the need to determine the likelihood of electrical cable failure which can lead to the loss of the ability to control or spurious actuation of equipment that is required for safe shutdown. A number of plants are now transitioning from their deterministic fire protection programs to a risk-informed, performance based fire protection program according to the requirements of National Fire Protection Association (NFPA) 805. Within a risk-informed framework, credit can be taken for the analysis of fire progression within a fire zone that was not permissible within the deterministic framework of a 10 CFR 50.48 Appendix R safe shutdown analysis. To perform the analyses required for the transition, plants need to be able to demonstrate with some level of assurance that cables related to safe shutdown equipment will not be compromised during postulated fire scenarios. This research contains the development of new cable failure models that have the potential to more accurately predict electrical cable failure in common cable bundle configurations. Methods to determine the thermal properties of the new models from empirical data are presented along with comparisons between the new models and existing techniques used in the nuclear industry today. A Dynamic Event Tree (DET) methodology is also presented which allows for the proper treatment of uncertainties associated with fire brigade intervention and its effects on cable failure analysis. Finally a shielding analysis is performed to determine the effects on the temperature response of a cable bundle that is shielded from a fire source by an intervening object such as another cable tray. The results from the analyses demonstrate that models of similar

  10. Technico-economic evaluation of abatement systems applying to air pollution resulting from coal-fired power plants

    International Nuclear Information System (INIS)

    Mounier, Marc.

    1981-09-01

    The aim of this study is to contribute to the analysis of the health care policies which could be considered in coal-fired power plants, in the comparative framework of the radiation protection in nuclear power plants. After a recall of the typical parameters of the air pollution due to the normal operation of a coal-fired power plant, we develop a heuristic model which allows, after having quantified the releases, to determine the theoretical health effects associated to a one-year operation of the power plant. The comparison of the various protection policies has been done with the help of a cost-effectiveness analysis. An examination of the results shows that the policy presently implemented forms a part of the cost-effective options. Nevertheless, it can be seen that the marginal protection cost is higher in nuclear power plants than in coal-fired power plants [fr

  11. Quantitative relationships between aging failure data and risk

    International Nuclear Information System (INIS)

    Vesely, W.E.; Vora, J.P.

    1988-01-01

    As part of the United States Nuclear Regulatory Commission's Nuclear Plant Aging Research program, a project is being carried out to quantify the risk effects of aging. The project is called the Risk Evaluation of Aging Phenomena (REAP) Project. With the REAP Project, a procedure has been developed to quantify nuclear power plant risks from aging failure data. The procedure utilizes the linear aging model and its extensions in order to relate component aging failure rates to aging mechanism parameters which are estimable from failure and maintenance data. The aging failure rates can then be used to quantify the age dependent plant risks, such as system unavailabilities, core melt frequency and public health risks. The REAP procedure is different from standard time dependent approaches in that the failure rates are phenomenologically based, allowing engineering information to be utilized. Furthermore, gross data and incomplete data can be utilized. A software package has been developed which systematically analyzes data for aging effects and interfaces with a time dependent risk analysis module to determine the risk implications of the aging effects. (author). 10 refs, 10 figs

  12. Current and future emissions of primary pollutants from coal-fired power plants in Shaanxi, China.

    Science.gov (United States)

    Xu, Yong; Hu, Jianlin; Ying, Qi; Hao, Hongke; Wang, Dexiang; Zhang, Hongliang

    2017-10-01

    A high-resolution inventory of primary atmospheric pollutants from coal-fired power plants in Shaanxi in 2012 was built based on a detailed database compiled at unit level involving unit capacity, boiler size and type, commission time, corresponding control technologies, and average coal quality of 72 power plants. The pollutants included SO 2 , NO x , fine particulate matter (PM 2.5 ), inhalable particulate matter (PM 10 ), organic carbon (OC), elemental carbon (EC), carbon monoxide (CO) and non-methane volatile organic compounds (NMVOC). Emission factors for SO 2 , NO x , PM 2.5 and PM 10 were adopted from standardized official promulgation, supplemented by those from local studies. The estimated annual emissions of SO 2 , NO x , PM 2.5 , PM 10 , EC, OC, CO and NMVOC were 152.4, 314.8, 16.6, 26.4, 0.07, 0.27, 64.9 and 2.5kt, respectively. Small units (emission rates compared to medium (≥100MW and emissions were decontamination efficiency, sulfur content and ash content of coal. Weinan and Xianyang were the two cities with the highest emissions, and Guanzhong Plain had the largest emission density. Despite the projected growth of coal consumption, emissions would decrease in 2030 due to improvement in emission control technologies and combustion efficiencies. SO 2 and NO x emissions would experience significant reduction by ~81% and ~84%, respectively. PM 2.5 , PM 10 , EC and OC would be decreased by ~43% and CO and NMVOC would be reduced by ~16%. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. Report on the survey in fiscal 1998. Survey on CO{sub 2} reduction at coal fired thermal power plants in Russia; 1998 nendo chosa hokokusho. Roshia sekitan karyoku hatsudensho CO{sub 2} sakugen chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Russia was selected as a candidate for the joint project implementation based on COP3, and coal fired thermal power plants in the country were surveyed. From among power plants having generation capacity of 200 GW, 600 thermal power plants account for 70%. Two-third of them are using natural gas as fuel, with the remaining plants using coal, which are noticeably overaged, having facility renewal as a pressing problem. Therefore, they can be the good targets for reducing carbon dioxide emission by modernizing the facilities. Promising projects with large cost effect of CO2 reduction were extracted in the Far Eastern and Siberian regions, where weight of coal fired thermal power plants is high. These projects include five plants including Amursk No. 1 and Kabarovsk No. 1 in the Far Eastern region, and five plants including Irkutsk Nos. 6, 10 and 11 in the Siberian region. From among 48 projects proposed to Japan by RAOEES 'ROSSII' in 1998, nine projects were surveyed individually as the objects of case study. Based on the survey and the consultation with the counterpart, draft proposals were prepared for each power plant, and CO2 reduction effect was evaluated. The Dogobuzh, Cherpet and Troitsk power plants were identified as having a promising potential. (NEDO)

  14. A Methodology for Modeling Nuclear Power Plant Passive Component Aging in Probabilistic Risk Assessment under the Impact of Operating Conditions, Surveillance and Maintenance Activities

    Science.gov (United States)

    Guler Yigitoglu, Askin

    In the context of long operation of nuclear power plants (NPPs) (i.e., 60-80 years, and beyond), investigation of the aging of passive systems, structures and components (SSCs) is important to assess safety margins and to decide on reactor life extension as indicated within the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. In the traditional probabilistic risk assessment (PRA) methodology, evaluating the potential significance of aging of passive SSCs on plant risk is challenging. Although passive SSC failure rates can be added as initiating event frequencies or basic event failure rates in the traditional event-tree/fault-tree methodology, these failure rates are generally based on generic plant failure data which means that the true state of a specific plant is not reflected in a realistic manner on aging effects. Dynamic PRA methodologies have gained attention recently due to their capability to account for the plant state and thus address the difficulties in the traditional PRA modeling of aging effects of passive components using physics-based models (and also in the modeling of digital instrumentation and control systems). Physics-based models can capture the impact of complex aging processes (e.g., fatigue, stress corrosion cracking, flow-accelerated corrosion, etc.) on SSCs and can be utilized to estimate passive SSC failure rates using realistic NPP data from reactor simulation, as well as considering effects of surveillance and maintenance activities. The objectives of this dissertation are twofold: The development of a methodology for the incorporation of aging modeling of passive SSC into a reactor simulation environment to provide a framework for evaluation of their risk contribution in both the dynamic and traditional PRA; and the demonstration of the methodology through its application to pressurizer surge line pipe weld and steam generator tubes in commercial nuclear power plants. In the proposed methodology, a

  15. Failure rates in Barsebaeck-1 reactor coolant pressure boundary piping. An application of a piping failure database

    International Nuclear Information System (INIS)

    Lydell, B.

    1999-05-01

    This report documents an application of a piping failure database to estimate the frequency of leak and rupture in reactor coolant pressure boundary piping. The study used Barsebaeck-1 as reference plant. The study tried two different approaches to piping failure rate estimation: 1) PSA-style, simple estimation using Bayesian statistics, and 2) fitting of statistical distribution to failure data. A large, validated database on piping failures (like the SKI-PIPE database) supports both approaches. In addition to documenting leak and rupture frequencies, the SKI report describes the use of piping failure data to estimate frequency of medium and large loss of coolant accidents (LOCAs). This application study was co sponsored by Barsebaeck Kraft AB and SKI Research

  16. Matching the results of a theoretical model with failure rates obtained from a population of non-nuclear pressure vessels

    International Nuclear Information System (INIS)

    Harrop, L.P.

    1982-02-01

    Failure rates for non-nuclear pressure vessel populations are often regarded as showing a decrease with time. Empirical evidence can be cited which supports this view. On the other hand theoretical predictions of PWR type reactor pressure vessel failure rates have shown an increasing failure rate with time. It is shown that these two situations are not necessarily incompatible. If adjustments are made to the input data of the theoretical model to treat a non-nuclear pressure vessel population, the model can produce a failure rate which decreases with time. These adjustments are explained and the results obtained are shown. (author)

  17. An assessment of mercury emissions and health risks from a coal-fired power plant

    Energy Technology Data Exchange (ETDEWEB)

    Fthenakis, V.M.; Lipfert, F.W.; Moskowitz, P.D.; Saroff, L. [Brookhaven National Laboratory, Upton, NY (United States)

    1995-12-01

    Title III of the 1990 Clean Air Act Amendments (CAAA) directed the US Environmental Protection Agency (EPA) to evaluate the rate and effect of mercury emissions in the atmosphere and technologies to control the emissions. The US DOE sponsored a risk assessment project at Brookhaven (BNL) to evaluate health risks of mercury emissions from coal combustion. Methylmercury (MeHg) is the compound predominantly responsible for human exposure to atmospheric mercury in the United States, through fish ingestion. In the BNL study, health risks to adults resulting from Hg emissions from a hypothetical coal-fired power plant were estimated using probabilistic risk assessment techniques. This study showed that the effects of emissions of a single large power plant may double the background exposures to MeHg resulting from consuming fish obtained from a localized are near the power plant. Even at these more elevated exposure levels, the attributable incidence in mild neurological symptoms (paresthesia) was estimated to be quite small, especially when compared with the estimated background incidence in the population. 29 refs., 5 figs., 2 tabs.

  18. An assessment of mercury emissions and health risks from a coal-fired power plant

    International Nuclear Information System (INIS)

    Fthenakis, V.M.; Lipfert, F.W.; Moskowitz, P.D.; Saroff, L.

    1995-01-01

    Title III of the 1990 Clean Air Act Amendments (CAAA) directed the US Environmental Protection Agency (EPA) to evaluate the rate and effect of mercury emissions in the atmosphere and technologies to control the emissions. The US DOE sponsored a risk assessment project at Brookhaven (BNL) to evaluate health risks of mercury emissions from coal combustion. Methylmercury (MeHg) is the compound predominantly responsible for human exposure to atmospheric mercury in the United States, through fish ingestion. In the BNL study, health risks to adults resulting from Hg emissions from a hypothetical coal-fired power plant were estimated using probabilistic risk assessment techniques. This study showed that the effects of emissions of a single large power plant may double the background exposures to MeHg resulting from consuming fish obtained from a localized are near the power plant. Even at these more elevated exposure levels, the attributable incidence in mild neurological symptoms (paresthesia) was estimated to be quite small, especially when compared with the estimated background incidence in the population. 29 refs., 5 figs., 2 tabs

  19. Failure rate of inferior alveolar nerve block among dental students and interns.

    Science.gov (United States)

    AlHindi, Maryam; Rashed, Bayan; AlOtaibi, Noura

    2016-01-01

    To report the failure rate of inferior alveolar nerve block (IANB) among dental students and interns, causes of failure, investigate awareness of different IANB techniques, and to report IANB-associated complications.   A 3-page questionnaire containing 13 questions was distributed to a random sample of 350 third to fifth years students and interns at the College of Dentistry, King Saud University, Riyadh, Saudi Arabia on January 2011. It included demographic questions (age, gender, and academic level) and questions on IANB failure frequency and reasons, actions taken to overcome the failure, and awareness of different anesthetic techniques, supplementary techniques, and complications.   Of the 250 distributed questionnaires, 238 were returned (68% response rate). Most (85.7%) of surveyed sample had experienced IANB failure once or twice. The participants attributed the failures most commonly (66.45%) to anatomical variations. The most common alternative technique used was intraligamentary injection (57.1%), although 42.8% of the sample never attempted any alternatives. Large portion of the samples stated that they either lacked both knowledge of and training for other techniques (44.9%), or that they had knowledge of them but not enough training to perform them (45.8%).  To  decrease IANB failure rates for dental students and interns, knowledge of landmarks, anatomical variation and their training in alternatives to IANB, such as the Gow-Gates and Akinosi techniques, both theoretically and clinically in the dental curriculum should be enhanced.

  20. Failure rate of inferior alveolar nerve block among dental students and interns

    Directory of Open Access Journals (Sweden)

    Maryam AlHindi

    2016-01-01

    Full Text Available Objectives: To report the failure rate of inferior alveolar nerve block (IANB among dental students and interns, causes of failure, investigate awareness of different IANB techniques, and to report IANB-associated complications. Methods: A 3-page questionnaire containing 13 questions was distributed to a random sample of 350 third to fifth years students and interns at the College of Dentistry, King Saud University, Riyadh, Saudi Arabia on January 2011. It included demographic questions (age, gender, and academic level and questions on IANB failure frequency and reasons, actions taken to overcome the failure, and awareness of different anesthetic techniques, supplementary techniques, and complications. Results: Of the 250 distributed questionnaires, 238 were returned (68% response rate. Most (85.7% of surveyed sample had experienced IANB failure once or twice. The participants attributed the failures most commonly (66.45% to anatomical variations. The most common alternative technique used was intraligamentary injection (57.1%, although 42.8% of the sample never attempted any alternatives. Large portion of the samples stated that they either lacked both knowledge of and training for other techniques (44.9%, or that they had knowledge of them but not enough training to perform them (45.8%. Conclusion: To decrease IANB failure rates for dental students and interns, knowledge of landmarks, anatomical variation and their training in alternatives to IANB, such as the Gow-Gates and Akinosi techniques, both theoretically and clinically in the dental curriculum should be enhanced.

  1. Demonstration test of electron beam flue gas treatment pilot plant of a coal fired thermal power station

    International Nuclear Information System (INIS)

    Doi, Yoshitaka; Hayashi, Kazuaki; Izutsu, Masahiro; Watanabe, Shigeharu; Namba, Hideki; Tokunaga, Okihiro; Hashimoto, Shoji; Tanaka, Tadashi; Ogura, Yoshimi.

    1995-01-01

    The Japan Atomic Energy Research Institute, Chubu Electric Power Company and Ebara Corporation jointly constructed a pilot plant for electron beam flue gas treatment (dry process) capable of treating 12,000 m 3 /h (NTP) of flue gas from a coal fired boiler, at Shin-Nagoya Thermal Power Station, Chubu Electric Power Company. Various tests carried out at the plant over a period extending one year verified the followings. By appropriately controlling parameters such as electron beam dosage, flue gas temperature, and ammonia stoichiometric amount, highly efficient simultaneous SO 2 and NOx removal from flue gas was achieved under all gas conditions, equal to or more efficient than that by the highest level conventional treatment. The operation of the pilot plant was stable and trouble-free over a long term, and the operation and the process was easy to operate and control. By-products (ammonium sulfate and ammonium nitrate) produced by the flue gas treatment were proven to have superior quality, equivalent to that of market-available nitrogen fertilizers. These by-products had been registered as by-product nitrogen fertilizers. (author)

  2. Engineering development of coal-fired high-performance power systems

    International Nuclear Information System (INIS)

    1998-01-01

    A High Performance Power System (HIPPS) is being developed. This system is a coal-fired, combined cycle plant with indirect heating of gas turbine air. Foster Wheeler Development Corporation and a team consisting of Foster Wheeler Energy Corporation, Bechtel Corporation, University of Tennessee Space Institute and Westinghouse Electric Corporation are developing this system. In Phase 1 of the project, a conceptual design of a commercial plant was developed. Technical and economic analyses indicated that the plant would meet the goals of the project which include a 47 percent efficiency (HHV) and a 10 percent lower cost of electricity than an equivalent size PC plant. The concept uses a pyrolyzation process to convert coal into fuel gas and char. The char is fired in a High Temperature Advanced Furnace (HITAF). The HITAF is a pulverized fuel-fired boiler/air heater where steam is generated and gas turbine air is indirectly heated. The fuel gas generated in the pyrolyzer is then used to heat the gas turbine air further before it enters the gas turbine. The project is currently in Phase 2, which includes engineering analysis, laboratory testing and pilot plant testing. Research and development is being done on the HIPPS systems that are not commercial or being developed on other projects. Pilot plant testing of the pyrolyzer subsystem and the char combustion subsystem are being done separately, and after each experimental program has been completed, a larger scale pyrolyzer will be tested at the Power Systems Development Facility (PSDF) in Wilsonville, Al. The facility is equipped with a gas turbine and a topping combustor, and as such, will provide an opportunity to evaluate integrated pyrolyzer and turbine operation. During this quarter, initial char combustion tests were performed at the CETF using a Foster Wheeler commercial burner. These preliminary tests were encouraging and will be used to support the development of an innovative char burner for the HIPPS

  3. Thermodynamic analysis and conceptual design for partial coal gasification air preheating coal-fired combined cycle

    Science.gov (United States)

    Xu, Yue; Wu, Yining; Deng, Shimin; Wei, Shirang

    2004-02-01

    The partial coal gasification air pre-heating coal-fired combined cycle (PGACC) is a cleaning coal power system, which integrates the coal gasification technology, circulating fluidized bed technology, and combined cycle technology. It has high efficiency and simple construction, and is a new selection of the cleaning coal power systems. A thermodynamic analysis of the PGACC is carried out. The effects of coal gasifying rate, pre-heating air temperature, and coal gas temperature on the performances of the power system are studied. In order to repower the power plant rated 100 MW by using the PGACC, a conceptual design is suggested. The computational results show that the PGACC is feasible for modernizing the old steam power plants and building the new cleaning power plants.

  4. RAM analysis of earth pressure balance tunnel boring machines: A case study

    Directory of Open Access Journals (Sweden)

    Hasel Amini Khoshalan

    2015-12-01

    Full Text Available Earth pressure balance tunnel boring machines (EPB-TBMs are favorably applied in urban tunneling projects. Despite their numerous advantages, considerable delays and high maintenance cost are the main disadvantages these machines suffer from. Reliability, availability, and maintainability (RAM analysis is a practical technique that uses failure and repair dataset obtained over a reasonable time for dealing with proper machine operation, maintenance scheduling, cost control, and improving the availability and performance of such machines. In the present study, a database of failures and repairs of an EBP-TBM was collected in line 1 of Tabriz subway project over a 26-month interval of machine operation. In order to model the reliability of the TBM, this machine was divided into five distinct subsystems including mechanical, electrical, hydraulic, pneumatic, and water systems in a series configuration. According to trend and serial correlation tests, the renewal processes were applied, for analysis of all subsystems. After calculating the reliability and maintainability functions for all subsystems, it was revealed that the mechanical subsystem with the highest failure frequency has the lowest reliability and maintainability. Similarly, estimating the availability of all subsystems indicated that the mechanical subsystem has a relatively low availability level of 52.6%, while other subsystems have acceptable availability level of 97%. Finally, the overall availability of studied machine was calculated as 48.3%.

  5. The multi-class binomial failure rate model for the treatment of common-cause failures

    International Nuclear Information System (INIS)

    Hauptmanns, U.

    1995-01-01

    The impact of common cause failures (CCF) on PSA results for NPPs is in sharp contrast with the limited quality which can be achieved in their assessment. This is due to the dearth of observations and cannot be remedied in the short run. Therefore the methods employed for calculating failure rates should be devised such as to make the best use of the few available observations on CCF. The Multi-Class Binomial Failure Rate (MCBFR) Model achieves this by assigning observed failures to different classes according to their technical characteristics and applying the BFR formalism to each of these. The results are hence determined by a superposition of BFR type expressions for each class, each of them with its own coupling factor. The model thus obtained flexibly reproduces the dependence of CCF rates on failure multiplicity insinuated by the observed failure multiplicities. This is demonstrated by evaluating CCFs observed for combined impulse pilot valves in German NPPs. (orig.) [de

  6. Emission Control Technologies for Thermal Power Plants

    Science.gov (United States)

    Nihalani, S. A.; Mishra, Y.; Juremalani, J.

    2018-03-01

    Coal thermal power plants are one of the primary sources of artificial air emissions, particularly in a country like India. Ministry of Environment and Forests has proposed draft regulation for emission standards in coal-fired power plants. This includes significant reduction in sulphur-dioxide, oxides of nitrogen, particulate matter and mercury emissions. The first step is to evaluate the technologies which represent the best selection for each power plant based on its configuration, fuel properties, performance requirements, and other site-specific factors. This paper will describe various technology options including: Flue Gas Desulfurization System, Spray Dryer Absorber (SDA), Circulating Dry Scrubber (CDS), Limestone-based Wet FGD, Low NOX burners, Selective Non Catalytic Reduction, Electrostatic Precipitator, Bag House Dust Collector, all of which have been evaluated and installed extensively to reduce SO2, NOx, PM and other emissions. Each control technology has its advantages and disadvantages. For each of the technologies considered, major features, potential operating and maintenance cost impacts, as well as key factors that contribute to the selection of one technology over another are discussed here.

  7. A model for the coupling of failure rates in a redundant system

    International Nuclear Information System (INIS)

    Kleppmann, W.G.; Wutschig, R.

    1986-01-01

    A model is developed which takes into acount the coupling between failure rates or identical components in different redundancies of a safety system, i.e., the fact that the failure rates of identical components subjected to the same operating conditions will scatter less than the failure rates of any two components of the same type. It is shown that with increasing coupling the expectation value and the variance of the distribution of the failure probability of the redundant system increases. A consistent way to incorporate operating experience in a Bayesian framework is developed and the reults are presented. (orig.)

  8. Development of operators' mental model acquisition system (2). Integration of knowledge representation about normal and abnormal plant states

    International Nuclear Information System (INIS)

    Kitamura, Y.; Ikeda, M.; Mizoguchi, R.; Yoshikawa, S.

    1999-03-01

    This report discusses a representation scheme of device failures anticipated in nuclear power plant, to describe related knowledge in a computer software. Coping ability covering a wide range of physical events is desired in plant operators and maintenance staffs, but it is impractical to give them a set of experience to cover the all possible events in the education/training curriculum. However, in case that their knowledge of plant design and of generally-known physical principles are enforced, their ability of cause identification and of appropriate responding actions against inexperienced events are expected to be enhanced, by combining the basic engineering and physical knowledge. Most of the anomalies anticipated in nuclear power plants are initiated as an incipient failure in some auxiliary equipment initially affecting only within the relative subsystem and hiding from the central control room, and then are propagated to deviate process parameters in the main subsystems to be observed from the control room. Incipient failures in auxiliary subsystems, such as a chemical degrading of an axis holder caused by a blockage of lubricant supply line through increased friction and subsequent extra heating, are typically local and irreversible consequences. On the other hand, deviation propagation in main systems, such as outlet temperature rise by an increased pump rotation friction though decreased coolant flow rate, are typically global and reversible consequences. This paper describes a methodology development to represent a category of knowledge to support operators' and maintenance staffs' effort in understanding local and irreversible failure consequences. (author)

  9. Fuel combustion in thermal power plants in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R.

    1983-11-01

    The position of black coal in the energy balance of Japan is discussed. About 75% of electric energy is produced by thermal power plants. Eighty-five per cent of electricity is produced by power plants fired with liquid fuels and 3% by coal fired plants. Coal production in Japan, the forecast coal import to the country by 1990 (132 Mt/year), proportion of coal imported from various countries, chemical and physical properties of coal from Australia, China and Japan are discussed. Coal classification used in Japan is evaluated. The following topics associated with coal combustion in fossil-fuel power plants in Japan are discussed: coal grindability, types of pulverizing systems, slagging properties of boiler fuel in Japan, systems for slag removal, main types of steam boilers and coal fired furnaces, burner arrangement and design, air pollution control from fly ash, sulfur oxides and nitrogen oxides, utilization of fly ash for cement production, methods for removal of nitrogen oxides from flue gas using ammonia and catalysts or ammonia without catalysts, efficiency of nitrogen oxide control, abatement of nitrogen oxide emission from boilers by flue gas recirculation and reducing combustion temperatures. The results of research into air pollution control carried out by the Nagasaki Technical Institute are reviewed.

  10. Power distribution gradients in WWER type cores and fuel failure root causes

    Energy Technology Data Exchange (ETDEWEB)

    Mikuš, Ján M., E-mail: JanMikus.nrc@hotmail.com

    2014-02-15

    Highlights: • Power (fission rate) distribution gradients can represent fuel failure root causes. • Positions with above gradients were investigated in WWER type cores on reactor LR-0. • Above gradients were evaluated near core heterogeneities and construction materials. • Results can be used for code validation and fuel failure occurrence investigation. - Abstract: Neutron flux non-uniformity and gradients of neutron current resulting in corresponding power (fission rate) distribution changes can represent root causes of the fuel failure. Such situation can be expected in vicinity of some core heterogeneities and construction materials. Since needed data cannot be obtained from nuclear power plant (NPP), results of some benchmark type experiments performed on light water, zero-power research reactor LR-0 were used for investigation of the above phenomenon. Attention was focused on determination of the spatial power distribution changes in fuel assemblies (FAs): Containing fuel rods (FRs) with Gd burnable absorber in WWER-440 and WWER-1000 type cores, Neighboring the core blanket and dummy steel assembly simulators on the periphery of the WWER-440 standard and low leakage type cores, resp., Neighboring baffle in WWER-1000 type cores, and Neighboring control rod (CR) in WWER-440 type cores, namely (a) power peak in axial power distribution in periphery FRs of the adjacent FAs near the area between CR fuel part and butt joint to the CR absorbing part and (b) decrease in radial power distribution in FRs near CR absorbing part. An overview of relevant experimental results from reactor LR-0 and some information concerning leaking FAs on NPP Temelín are presented. Obtained data can be used for code validation and subsequently for the fuel failure occurrence investigation.

  11. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  12. Coal-Fired Power Plants, Region 9, 2011, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Approximate locations of active coal-fired power plants located in US EPA's Region 9. Emission counts from the 2005 National Emissions Inventory (NEI) are included...

  13. Epistemic uncertainties when estimating component failure rate

    International Nuclear Information System (INIS)

    Jordan Cizelj, R.; Mavko, B.; Kljenak, I.

    2000-01-01

    A method for specific estimation of a component failure rate, based on specific quantitative and qualitative data other than component failures, was developed and is described in the proposed paper. The basis of the method is the Bayesian updating procedure. A prior distribution is selected from a generic database, whereas likelihood is built using fuzzy logic theory. With the proposed method, the component failure rate estimation is based on a much larger quantity of information compared to the presently used classical methods. Consequently, epistemic uncertainties, which are caused by lack of knowledge about a component or phenomenon are reduced. (author)

  14. Effects of Loading Rate on Gas Seepage and Temperature in Coal and Its Potential for Coal-Gas Disaster Early-Warning

    Directory of Open Access Journals (Sweden)

    Chong Zhang

    2017-08-01

    Full Text Available The seepage velocity and temperature externally manifest the changing structure, gas desorption and energy release that occurs in coal containing gas failure under loading. By using the system of coal containing gas failure under loading, this paper studies the law of seepage velocity and temperature under different loading rates and at 1.0 MPa confining pressure and 0.5 MPa gas pressure, and combined the on-site results of gas pressure and temperature. The results show that the stress directly affects the seepage velocity and temperature of coal containing gas, and the pressure and content of gas have the most sensitivity to mining stress. Although the temperature is not sensitive to mining stress, it has great correlation with mining stress. Seepage velocity has the characteristic of critically slowing down under loading. This is demonstrated by the variance increasing before the main failure of the samples. Therefore, the variance of seepage velocity with time and temperature can provide an early warning for coal containing gas failing and gas disasters in a coal mine.

  15. National trends in heart failure hospitalization rates in Slovenia 2004-2012.

    Science.gov (United States)

    Omersa, Daniel; Farkas, Jerneja; Erzen, Ivan; Lainscak, Mitja

    2016-11-01

    Heart failure (HF) hospitalization rates are decreasing in western Europe, but little is known about trends in central and east European countries. We analysed the Slovenian national hospitalization database to determine the burden of HF hospitalization. The Slovenian National Hospital Discharge Registry was searched for HF hospitalizations between 2004 and 2012 in patients aged ≥20 years. A total of 55 531 main HF hospitalizations (43 636 first HF hospitalizations) in 34 406 patients (median age 78 years, 55% female) were recorded. The most common co-morbidities were arterial hypertension (54.3%), atrial fibrillation (40.6%), diabetes mellitus (24.5%), and ischaemic heart disease (21.9%). The number of age-standardized main and first HF hospitalizations per 100 000 population decreased from 249 to 232 (7.1%, P = 0.002) and from 467 to 435 (6.8%, P = 0.074), respectively. Crude main and first HF hospitalization rates increased from 249 to 298 (19.8%, P Slovenia, standardized HF hospitalization rates have decreased but the crude HF hospitalization burden has increased. Readmissions were associated with established cardiovascular risk factors. © 2016 The Authors. European Journal of Heart Failure © 2016 European Society of Cardiology.

  16. Infraclavicular versus axillary nerve catheters: A retrospective comparison of early catheter failure rate.

    Science.gov (United States)

    Quast, Michaela B; Sviggum, Hans P; Hanson, Andrew C; Stoike, David E; Martin, David P; Niesen, Adam D

    2018-05-01

    Continuous brachial plexus catheters are often used to decrease pain following elbow surgery. This investigation aimed to assess the rate of early failure of infraclavicular (IC) and axillary (AX) nerve catheters following elbow surgery. Retrospective study. Postoperative recovery unit and inpatient hospital floor. 328 patients who received IC or AX nerve catheters and underwent elbow surgery were identified by retrospective query of our institution's database. Data collected included unplanned catheter dislodgement, catheter replacement rate, postoperative pain scores, and opioid administration on postoperative day 1. Catheter failure was defined as unplanned dislodging within 24 h of placement or requirement for catheter replacement and evaluated using a covariate adjusted model. 119 IC catheters and 209 AX catheters were evaluated. There were 8 (6.7%) failed IC catheters versus 13 (6.2%) failed AX catheters. After adjusting for age, BMI, and gender there was no difference in catheter failure rate between IC and AX nerve catheters (p = 0.449). These results suggest that IC and AX nerve catheters do not differ in the rate of early catheter failure, despite differences in anatomic location and catheter placement techniques. Both techniques provided effective postoperative analgesia with median pain scores < 3/10 for patients following elbow surgery. Reasons other than rate of early catheter failure should dictate which approach is performed. Copyright © 2018. Published by Elsevier Inc.

  17. The failure rate dynamics in heterogeneous populations

    International Nuclear Information System (INIS)

    Cha, Ji Hwan; Finkelstein, Maxim

    2013-01-01

    Most populations encountered in real world are heterogeneous. In reliability applications, the mixture (observed) failure rate, obviously, can be considered as a measure of ‘average’ quality in these populations. However, in addition to this average measure, some variability characteristics for failure rates can be very helpful in describing the time-dependent changes in quality of heterogeneous populations. In this paper, we discuss variance and the coefficient of variation of the corresponding random failure rate as variability measures for items in heterogeneous populations. Furthermore, there is often a risk that items of poor quality are selected for important missions. Therefore, along with the ‘average quality’ of a population, more ‘conservative’ quality measures should be also defined and studied. For this purpose, we propose the percentile and the tail-mixture of the failure rates as the corresponding conservative measures. Some illustrative examples are given. -- Highlights: ► This paper provides the insight on the variability measures in heterogeneous populations. ► The conservative quality measures in heterogeneous populations are defined. ► The utility of these measures is illustrated by meaningful examples. ► This paper provides a better understanding of the dynamics in heterogeneous populations

  18. ANN-GA based optimization of a high ash coal-fired supercritical power plant

    International Nuclear Information System (INIS)

    Suresh, M.V.J.J.; Reddy, K.S.; Kolar, Ajit Kumar

    2011-01-01

    Highlights: → Neuro-genetic power plant optimization is found to be an efficient methodology. → Advantage of neuro-genetic algorithm is the possibility of on-line optimization. → Exergy loss in combustor indicates the effect of coal composition on efficiency. -- Abstract: The efficiency of coal-fired power plant depends on various operating parameters such as main steam/reheat steam pressures and temperatures, turbine extraction pressures, and excess air ratio for a given fuel. However, simultaneous optimization of all these operating parameters to achieve the maximum plant efficiency is a challenging task. This study deals with the coupled ANN and GA based (neuro-genetic) optimization of a high ash coal-fired supercritical power plant in Indian climatic condition to determine the maximum possible plant efficiency. The power plant simulation data obtained from a flow-sheet program, 'Cycle-Tempo' is used to train the artificial neural network (ANN) to predict the energy input through fuel (coal). The optimum set of various operating parameters that result in the minimum energy input to the power plant is then determined by coupling the trained ANN model as a fitness function with the genetic algorithm (GA). A unit size of 800 MWe currently under development in India is considered to carry out the thermodynamic analysis based on energy and exergy. Apart from optimizing the design parameters, the developed model can also be used for on-line optimization when quick response is required. Furthermore, the effect of various coals on the thermodynamic performance of the optimized power plant is also determined.

  19. Application of T2 Control Charts and Hidden Markov Models in Condition-Based Maintenance at Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Emilija Kisić

    2015-01-01

    Full Text Available An innovative approach to condition-based maintenance of coal grinding subsystems at thermoelectric power plants is proposed in the paper. Coal mill grinding tables become worn over time and need to be replaced through time-based maintenance, after a certain number of service hours. At times such replacement is necessary earlier or later than prescribed, depending on the quality of the coal and of the grinding table itself. Considerable financial losses are incurred when the entire coal grinding subsystem is shut down and the grinding table found to not actually require replacement. The only way to determine whether replacement is necessary is to shut down and open the entire subsystem for visual inspection. The proposed algorithm supports condition-based maintenance and involves the application of T2 control charts to distinct acoustic signal parameters in the frequency domain and the construction of Hidden Markov Models whose observations are coded samples from the control charts. In the present research, the acoustic signals were collected by coal mill monitoring at the thermoelectric power plant “Kostolac” in Serbia. The proposed approach provides information about the current condition of the grinding table.

  20. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Emmanuel [Energetics, Inc., Columbia, MD (United States)

    2018-02-01

    Coal continues to play a critical role in powering the Nation’s electricity generation, especially for baseload power plants. With aging coal generation assets facing decreased performance due to the state of the equipment, and with challenges exacerbated by the current market pressures on the coal sector, there are opportunities to advance early-stage technologies that can retrofit or replace equipment components. These changes will eventually result in significant improvements in plant performance once further developed and deployed by industry. Research and development in areas such as materials, fluid dynamics, fuel properties and preparation characteristics, and a new generation of plant controls can lead to new components and systems that can help improve the efficiency and reliability of coal-fired power plants significantly, allowing these assets to continue to provide baseload power. Coal stockpiles at electricity generation plants are typically large enough to provide 30 to 60 days of power prior to resupply—significantly enhancing the stability and reliability of the U.S. electricity sector. Falling prices for non-dispatchable renewable energy and mounting environmental regulations, among other factors, have stimulated efforts to improve the efficiency of these coal-fired electric generating units (EGUs). In addition, increased reliance on natural gas and non-dispatchable energy sources has spurred efforts to further increase the reliability of coal EGUs. The Coal Powered EGU Efficiency and Reliability Dialogue brought together stakeholders from across the coal EGU industry to discuss methods for improvement. Participants at the event reviewed performance-enhancing innovations in coal EGUs, discussed the potential for data-driven management practices to increase efficiency and reliability, investigated the impacts of regulatory compliance on coal EGU performance, and discussed upcoming challenges for the coal industry. This report documents the key

  1. Integrating geothermal into coal-fired power plant with carbon capture: A comparative study with solar energy

    International Nuclear Information System (INIS)

    Wang, Fu; Deng, Shuai; Zhao, Jun; Zhao, Jiapei; Yang, Guohua; Yan, Jinyue

    2017-01-01

    Highlights: • Post-combustion carbon capture integrating geothermal energy was proposed. • A 300 MWe subcritical coal-fired plant was selected as the baseline. • The geothermal assisted carbon capture system was compared with solar assisted carbon capture plant. • Two different locations were chosen for the technical and economical comparison. • Using medium temperature geothermal thermal energy to replace steam extraction performs better performance. - Abstract: A new system integrating geothermal energy into post-combustion carbon capture is proposed in this paper. Geothermal energy at medium temperatures is used to provide the required thermal heat for solvent regeneration. The performance of this system is compared with solar assisted carbon capture plant via technical and economic evaluation. A 300 MWe coal-fired power plant is selected as the reference case, and two different locations based on the local climatic conditions and geothermal resources are chosen for the comparison. The results show that the geothermal assisted post-combustion carbon capture plant has better performances than the solar assisted one in term of the net power output and annual electricity generation. The net plant average efficiency based on lower heating value can be increased by 2.75% with a thermal load fraction of about 41%. Results of economic assessment show that the proposed geothermal assisted post-combustion carbon capture system has lower levelized costs of electricity and cost of carbon dioxide avoidance compared to the solar assisted post-combustion carbon capture plant. In order to achieve comparative advantages over the reference post-combustion carbon capture plant in both locations, the price of solar collector has to be lower than 70 USD/m 2 , and the drilling depth of the geothermal well shall be less than 2.1 km.

  2. Probabilistic approach to determining the optimum replacement of a superheater stage in 680 MW coal-fired boiler

    Energy Technology Data Exchange (ETDEWEB)

    Bos, Robert; Star, Ruud van der [Nuon Power Generation, Amsterdam (Netherlands)

    2009-07-01

    The boiler of the NUON power plant HW08 that went into operation in 1993 is designed as Benson boiler and mainly fired with hard coal. A creep-related tube failure occurred in the tertiary superheater that had been due to increased wall temperature caused by steam side formation of oxide layers. The theoretical lifetime of the components was calculated with the aid of the results of steam side oxide measurements and condition evaluation of the tertiary superheater with the aid of tube samples. The objective is to establish an operation and maintenance schedule for the desired operating lifetime of 300,000 hours. (orig.)

  3. Impact of a coal fired power plant on 226Ra activity level in sea water

    International Nuclear Information System (INIS)

    Marovic, G.; Sencar, J.

    1999-01-01

    The paper deals with radioactivity contamination originating from a coal fired power plant which, due to its location, may present a remarkable environmental problem. The plant is situated in a bay of the Adriatic close to the densely populated area with highly developed touristic activity. Its operation may cause significant damage to rich marine ecosystem characteristic for this part of the Croatian Adriatic as well as endanger urban and touristic developmental prospects of the area. Investigations of coal used in regular plant operation and of solid incombustible ash and slag showed increased natural radioactivity levels which may cause general environmental contamination of the bay as well as contamination of the marine environment of this part of the Croatian Adriatic

  4. Accident prevention in power plants

    International Nuclear Information System (INIS)

    Steyrer, H.

    Large thermal power plants are insured to a great extent at the Industrial Injuries Insurance Institute of Instrument and Electric Engineering. Approximately 4800 employees are registered. The accident frequency according to an evaluation over 12 months lies around 79.8 per year and 1000 employees in fossil-fired power plants, around 34.1 per year and 1000 employees in nuclear power plants, as in nuclear power plants coal handling and ash removal are excluded. Injuries due to radiation were not registered. The crucial points of accidents are mechanical injuries received on solid, sharp-edged and pointed objects (fossil-fired power plants 28.6%, nuclear power plants 41.5%), stumbling, twisting or slipping (fossil-fired power plants 21.8%, nuclear power plants 19.5%) and injuries due to moving machine parts (only nuclear power plants 12.2%). However, accidents due to burns or scalds obtain with 4.2% and less a lower portion than expected. The accident statistics can explain this fact in a way that the typical power plant accident does not exist. (orig./GL) [de

  5. Failure rates in Barsebaeck-1 reactor coolant pressure boundary piping. An application of a piping failure database

    Energy Technology Data Exchange (ETDEWEB)

    Lydell, B. [RSA Technologies, Vista, CA (United States)

    1999-05-01

    This report documents an application of a piping failure database to estimate the frequency of leak and rupture in reactor coolant pressure boundary piping. The study used Barsebaeck-1 as reference plant. The study tried two different approaches to piping failure rate estimation: 1) PSA-style, simple estimation using Bayesian statistics, and 2) fitting of statistical distribution to failure data. A large, validated database on piping failures (like the SKI-PIPE database) supports both approaches. In addition to documenting leak and rupture frequencies, the SKI report describes the use of piping failure data to estimate frequency of medium and large loss of coolant accidents (LOCAs). This application study was co sponsored by Barsebaeck Kraft AB and SKI Research 41 refs, figs, tabs

  6. Failure Rate of Pediatric Dental Treatment under General Anesthesia

    Directory of Open Access Journals (Sweden)

    Effat Khodadadi

    2018-06-01

    Full Text Available Aim: To assess the failure rates of various pediatric dental treatments performed under general anesthesia (GA after six months to five years of follow-up. Design: This multicenter retrospective cohort study was performed on patients treated by five pedodontists in two private hospitals located in northern Iran during 2010–2013 and comprised 155 patients. The patients were recalled and clinically examined. During the clinical examination of the primary teeth, oral hygiene, dmft index, and failure of previous treatments was evaluated. The data were analyzed using the Chi square and regression analyses with a significance level of 0.05. Results: 114 patients (74 males and 40 females, mean age: 37.17 ± 10.75 months with 1155 primary teeth treated under GA participated in the follow-up. The overall failure rate was 6.59%. The failure rates of pulpectomy, pulopotomy, fissure sealant, stainless steel crown (SSC, amalgam, and composite fillings were 2.90%, 3.03%, 4.83%, 5.26%, 5.33%, and 9.63%, respectively. Among the confounding factors, only gender had a significant effect on the anterior composite failure rate (p = 0.029 and age had a significant effect on the failure rate of fissure sealant therapy (p = 0.015 and SSC (p = 0.018. Conclusion: The overall rate of treatment failure in pediatric patients, treated under GA, was 6.59%.

  7. Achieving zero fuel failure rates at Armenian NPP

    International Nuclear Information System (INIS)

    Muradyan, T.

    2015-01-01

    In spite of the zero fuel failure rates in Armenian NPP there is a continued high level of interest. The generally accepted goal of achieving a zero failure rate requires detailed knowledge of existing failure mechanisms, their root causes and remedies. In this paper the foreign material management; water-chemistry regime; refuel machine management system and the transition into the use of vibration proof fuel of average enrichment 3,82% are presented

  8. Preventive maintenance basis: Volume 19 -- HVAC -- chillers and compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to HVAC -- Chillers and Compressors. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  9. Model-based Fuel Flow Control for Fossil-fired Power Plants

    DEFF Research Database (Denmark)

    Niemczyk, Piotr

    2010-01-01

    -fired power plants represent the largest reserve of such controllable power sources in several countries. However, their production take-up rates are limited, mainly due to poor fuel flow control. The thesis presents analysis of difficulties and potential improvements in the control of the coal grinding...

  10. The Hanford Site generic component failure-rate database compared with other generic failure-rate databases

    International Nuclear Information System (INIS)

    Reardon, M.F.; Zentner, M.D.

    1992-11-01

    The Risk Assessment Technology Group, Westinghouse Hanford Company (WHC), has compiled a component failure rate database to be used during risk and reliability analysis of nonreactor facilities. Because site-specific data for the Hanford Site are generally not kept or not compiled in a usable form, the database was assembled using information from a variety of other established sources. Generally, the most conservative failure rates were chosen from the databases reviewed. The Hanford Site database has since been used extensively in fault tree modeling of many Hanford Site facilities and systems. The purpose of this study was to evaluate the reasonableness of the data chosen for the Hanford Site database by comparing the values chosen with the values from the other databases

  11. An overview of a knowledge based system for preventive maintenance support of nuclear power plants

    International Nuclear Information System (INIS)

    Terano, Takao; Nishiyama, Takuya; Yokoo, Takeshi

    1984-01-01

    In recent years, much interest has been paid to knowledge engineering techniques for new vehicles of advanced information processing. As a practical application in electric power industry, this report discusses a knowledge based system for supporting preventive maintenance of nuclear power plants. To support preventive maintenance tasks, the system must have facilities to reason failures and accidents of the plants, to evaluate their significance, to predict any possible troubles, and to indentify appropriate preventive countermeasures for them. This report describes the overview of the prototype system from a viewpoint of knowledge engineering. The results of the study are as follows: (1) The knowledge base of the prototype system consists of a data-base on plants and a rule-base derived from experts' knowledge. Using the information in the knowledge base, the system diagnoses the plant without real-time interaction with operational plants. (2) Expert's knowledge in the rule-base is represented in the non-procedural declarative forms. These rules are organized in some hierarchical structure so as to be used efficiently and used in conjunction with the corresponding set of plant information in the data-base. (3) The prototype system is incrementally developed with the rapid prototyping techniques, that is, the processes of design, implementation and evaluation are repeated several times. (author)

  12. Preventive maintenance instrumentation results in Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Palomo Anaya, M. Jose; Verdu Martin, Gumersindo; Arnaldos Gonzalvez, Adoracion; Nieva, Marcelino Curiel

    2011-01-01

    This paper is a recompilation of the most significant results in relation to the researching in Preventive and Predictive Maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and The Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the Power Plants Control and Instrumentation Department technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the aim to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish Nuclear Power Plants each of them shall give a significant contribution to problem resolution and power plant performance: Fluctuations in sensor lines (case 1), Air presence in feed water lines (case 2), Root valve partially closed (case 3), Sensor malfunctions (case 4), Electrical source malfunctions (case 5), RTD malfunctions (case 6) and LPRM malfunctions (case 7). (author)

  13. Preventive maintenance instrumentation results in Spanish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Palomo Anaya, M. Jose; Verdu Martin, Gumersindo, E-mail: mpalomo@iqn.upv.es, E-mail: gverdu@iqn.upv.es [ISIRYM Universidad Politecnica de Valencia, Valencia (Spain); Arnaldos Gonzalvez, Adoracion, E-mail: a.arnaldos@titaniast.com [TITANIA Servicios Tecnologicos SL, Valencia (Spain); Nieva, Marcelino Curiel, E-mail: m.curiel@lainsa.com [Logistica y Acondicionamientos Industriales SAU (LAINSA), Valencia (Spain)

    2011-07-01

    This paper is a recompilation of the most significant results in relation to the researching in Preventive and Predictive Maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and The Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the Power Plants Control and Instrumentation Department technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the aim to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish Nuclear Power Plants each of them shall give a significant contribution to problem resolution and power plant performance: Fluctuations in sensor lines (case 1), Air presence in feed water lines (case 2), Root valve partially closed (case 3), Sensor malfunctions (case 4), Electrical source malfunctions (case 5), RTD malfunctions (case 6) and LPRM malfunctions (case 7). (author)

  14. International technologies market for coal thermal power plants

    International Nuclear Information System (INIS)

    1998-01-01

    This paper reports a general framework of potential market of clean coal combustion technologies in thermal power plants, specially for commercialization and market penetration in developing countries [it

  15. Operation management of thermal power plant. Karyoku plant no unten kanri

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-15

    Nowadays, thermal power plants are getting bigger and bigger in capacity. At the same time, high reliability to the frequent start and stop due to the demand change as well as effective economy. This paper describes the total operation management system. It included the start and stop, normal operation, specified operation, water quality, operation management involving the environmental problems, protection of machinery and equipment in case of emergency, measures against the failure, and the measures against the disaster. The outline of the normal operation is as follows: from the cost economical point of view, the kind of fuel is changed according to the load; i.e., coal for basic operation, LNG for basic to medium operation, and oil for medium to peak operation. The change in demand cannot be followed by the hydroelectric power. The adjustment of the power depending on the load change can be achieved by the thermal power generation. The automatic frequency control, economical load distribution control are also done. In the nighttime, the minimum load operation is required. The voltage change operation below the rated value or the phase-advancing operation is also done depending on the load conditions. 21 figs., 6 tabs.

  16. Monitoring failure rates of commercial implant brands; substantial equivalence in question?

    Science.gov (United States)

    Hujoel, Philippe; Becker, William; Becker, Burton

    2013-07-01

    The aim of this study was to report on the failure rates of two distinct dental implant systems in a clinical practice setting. Date of implant placement and loss were entered prospectively in a data registry system. Failure rates of two commercially pure titanium implants, one with a porous oxydized surface (POS) and the other with a chemically altered surface (CAS), were assessed using a quality control chart and survival analyses. A total of 860 POS and 759 CAS implants were placed. A warning of an increased failure rate of the CAS implant was identified by means of the quality control chart. Survival analyses indicated that the CAS implant failure rate was twice that of the POS implant (Hazard Ratio: 2.08; 95% CI: 1.33-3.28, P-value POS implant was associated with a non-significant 64% drop in the implant failure rate within less than a year (HR: 0.36; 95% CI: 0.12-1.14; P-value POS implant and an 8% failure with the CAS implant appears inconsistent with the assumption of substantial equivalence. © 2012 John Wiley & Sons A/S.

  17. Coal-fired high performance power generating system. Quarterly progress report, July 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This report covers work carried out under Task 3, Preliminary Research and Development, and Task 4, Commercial Generating Plant Design, under contract DE-AC22-92PC91155, {open_quotes}Engineering Development of a Coal Fired High Performance Power Generation System{close_quotes} between DOE Pittsburgh Energy Technology Center and United Technologies Research Center. The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) by the year 2000 that is capable of >47% thermal efficiency; NO{sub x}, SO{sub x}, and particulates {le} 25% NSPS; cost {ge} 65% of heat input; and all solid wastes benign. The report discusses progress in cycle analysis, chemical reactor modeling, ash deposition rate calculations for HITAF (high temperature advanced furnace) convective air heater, air heater materials, and deposit initiation and growth on ceramic substrates.

  18. Preventive maintenance basis: Volume 16 -- Power operated relief valves, solenoid actuated. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This volume 16 of the report provides a program of PM tasks suitable for application to power operated relief valves (PORV's) that are solenoid actuated. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  19. Silicon-controlled rectifier failure investigation report, April 11 and May 7, 1986, Type A occurrence

    International Nuclear Information System (INIS)

    1986-01-01

    As a result of the April 11, 1986 failure and subsequent property damage of the silicon-controlled rectifier (SCR) device used to provide dc power to the motor driven construction and salt handling (CandSH) hoist at the Waste Isolation Pilot Plant (WIPP), the Project Manager, WIPP Project Office, appointed an Accident Investigation Board on April 14, 1986. The Board was tasked to investigate, to determine the cause or causes of the SCR failure, and to make appropriate recommendations to prevent a recurrence. Subsequently, the scope of the investigation was expanded on April 22, 1986, to include a series of failures that occurred after the initial failure. This occurrence came after the SCR had been released by the Board, repaired, modified, and returned to use. The investigation included a review of the engineering, procurement, operations, and maintenance programs of the Management and Operating Contractor (MOC), along with a detailed investigation of the hardware involved in the failure. Analytical techniques included use of the Management Oversight Risk Tree (MORT) and Events and Causal Factors Sequence Charting. 15 figs

  20. Recent advances in prediction of emission of hazardous air pollutants from coal-fired power plants

    International Nuclear Information System (INIS)

    Senior, C.L.; Helble, J.J.; Sarofim, A.F.

    2000-01-01

    Coal-fired power plants are a primary source of mercury discharge into the atmosphere along with fine particulates containing arsenic, selenium, cadmium, and other hazardous air pollutants. Information regarding the speciation of these toxic metals is necessary to accurately predict their atmospheric transport and fate in the environment. New predictive tools have been developed to allow utilities to better estimate the emissions of toxic metals from coal-fired power plants. These prediction equations are based on fundamental physics and chemistry and can be applied to a wide variety of fuel types and combustion conditions. The models have significantly improved the ability to predict the emissions of air toxic metals in fine particulate and gas-phase mercury. In this study, the models were successfully tested using measured mercury speciation and mass balance information collected from coal-fired power plants

  1. AC power flow importance measures considering multi-element failures

    International Nuclear Information System (INIS)

    Li, Jian; Dueñas-Osorio, Leonardo; Chen, Changkun; Shi, Congling

    2017-01-01

    Quantifying the criticality of individual components of power systems is essential for overall reliability and management. This paper proposes an AC-based power flow element importance measure, while considering multi-element failures. The measure relies on a proposed AC-based cascading failure model, which captures branch overflow, bus load shedding, and branch failures, via AC power flow and optimal power flow analyses. Taking the IEEE 30, 57 and 118-bus power systems as case studies, we find that N-3 analyses are sufficient to measure the importance of a bus or branch. It is observed that for a substation bus, its importance is statistically proportional to its power demand, but this trend is not observed for power plant buses. While comparing with other reliability, functionality, and topology-based importance measures popular today, we find that a DC power flow model, although better correlated with the benchmark AC model as a whole, still fails to locate some critical elements. This is due to the focus of DC-based models on real power that ignores reactive power. The proposed importance measure is aimed to inform decision makers about key components in complex systems, while improving cascading failure prevention, system backup setting, and overall resilience. - Highlights: • We propose a novel importance measure based on joint failures and AC power flow. • A cascading failure model considers both AC power flow and optimal power flow. • We find that N-3 analyses are sufficient to measure the importance of an element. • Power demand impacts the importance of substations but less so that of generators. • DC models fail to identify some key elements, despite correlating with AC models.

  2. Radioactive emission from thermal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Okamoto, K [New South Wales Univ., Kensington (Australia). Dept. of Applied Mathematics

    1981-07-01

    Radioactive hazards of the emissions and wastes of thermal power plants arising from fuel impurities of uranium and thorium are discussed. The hazard due to radioactive emission is calculated for an average Australian bituminous coal which contains 2 ppm of U and 2.7 ppm of Th. When the dust removal efficiency of a coal-fired power plant is 99%, the radioactive hazard is greater than that of a nuclear reactor of the same electrical output. After 500 years the radioactive toxicity of the coal waste will be higher than that of fission products of a nuclear reactor and after 2,000 years it will exceed the toxicity of all the nuclear wastes including actinides. The results of a recent calculation are shown, according to which the radioactive hazard of a coal-fired power plant to the public is from several hundred to several tens of thousands of times higher than that of a total fuel cycle of plutonium. It is found that in some regions, such as Japan, the hazard due to /sup 210/Po through seafood could be considerable.

  3. Sterilization: new method options, failure rate info.

    Science.gov (United States)

    1998-01-01

    This article discusses new sterilization methods for tubal ligation, failure rates, and risks for ectopic pregnancy in the US. The Filshie clip, which was developed by Femcare, Ltd. in Nottingham, England, and is distributed by Avalon Medical Corp of Vermont, was approved by the US Food and Drug Administration in September 1996. The company has provided training sessions at major universities nationwide and exhibited at national professional association meetings. A training video and two more films will be available in 1998. The new clip is considered a more modern approach to a tubal occlusion method, which relies on newer materials and solves prior problems. Physicians usually used Falope rings, which had better failure rates than the Hulka clip and bipolar coagulation methods. There is a need for more long-term and large scale information exchange about the new Filshie clip. Some physicians still use the Falope ring because it is cost effective and well-studied. Physicians are warned to continue to advise women about the potential failure rates up to 10 years after sterilization and the 1 in 3 risk of ectopic pregnancy. Counseling about failure rates and the risk of ectopic pregnancy should target women under 30 years old, who have the highest failure rates, and women 30-34 years old. All sterilized women should be advised to seek a provider immediately if they have pregnancy symptoms following sterilization. Counseling should include the issue of "regrets," since it is a permanent method. All women should know about nonpermanent methods and experience a basic informed consent process. Young women and newly divorced women are particularly vulnerable to the "regrets" syndrome.

  4. Radiological consequences of atmospheric releases from coal-fired power plants

    International Nuclear Information System (INIS)

    Tveten, U.

    1985-06-01

    The report deals with the individual and collective doses resulting from radioactive materials contained in the stack releases of coal-fired power plants. A critical analysis of relevant calculations in literature is given. The different reports analyzed show a very wide range in calculated doses. To a great extent these differences may be explained by the wide range in the assumptions adopted. There is also disagreement on what exposure pathways are the most important, and what nuclides contribute most to calculated doses. A most probable value of 0.5 mrem/year for the maximum individual effective dose equivalent commitment, is indicated in the report

  5. A preventive maintenance policy based on dependent two-stage deterioration and external shocks

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Peng, Rui; Zhai, Qingqing; Zhao, Yu

    2017-01-01

    This paper proposes a preventive maintenance policy for a single-unit system whose failure has two competing and dependent causes, i.e., internal deterioration and sudden shocks. The internal failure process is divided into two stages, i.e. normal and defective. Shocks arrive according to a non-homogeneous Poisson process (NHPP), leading to the failure of the system immediately. The occurrence rate of a shock is affected by the state of the system. Both an age-based replacement and finite number of periodic inspections are schemed simultaneously to deal with the competing failures. The objective of this study is to determine the optimal preventive replacement interval, inspection interval and number of inspections such that the expected cost per unit time is minimized. A case study on oil pipeline maintenance is presented to illustrate the maintenance policy. - Highlights: • A maintenance model based on two-stage deterioration and sudden shocks is developed. • The impact of internal system state on external shock process is studied. • A new preventive maintenance strategy combining age-based replacements and periodic inspections is proposed. • Postponed replacement of a defective system is provided by restricting the number of inspections.

  6. Local deposition of mercury in topsoils around coal-fired power plants: is it always true?

    Science.gov (United States)

    Rodriguez Martin, José Antonio; Nanos, Nikos; Grigoratos, Theodoros; Carbonell, Gregoria; Samara, Constantini

    2014-09-01

    Mercury (Hg) is a toxic element that is emitted to the atmosphere through human activities, mainly fossil fuel combustion. Hg accumulations in soil are associated with atmospheric deposition, while coal-burning power plants remain the most important source of anthropogenic mercury emissions. In this study, we analyzed the Hg concentration in the topsoil of the Kozani-Ptolemais basin where four coal-fired power plants (4,065 MW) run to provide 50 % of electricity in Greece. The study aimed to investigate the extent of soil contamination by Hg using geostatistical techniques to evaluate the presumed Hg enrichment around the four power plants. Hg variability in agricultural soils was evaluated using 276 soil samples from 92 locations covering an area of 1,000 km(2). We were surprised to find a low Hg content in soil (range 1-59 μg kg(-1)) and 50 % of samples with a concentration lower than 6 μg kg(-1). The influence of mercury emissions from the four coal-fired power plants on soil was poor or virtually nil. We associate this effect with low Hg contents in the coal (1.5-24.5 μg kg(-1)) used in the combustion of these power plants (one of the most Hg-poor in the world). Despite anthropic activity in the area, we conclude that Hg content in the agricultural soils of the Kozani-Ptolemais basin is present in low concentrations.

  7. Optimizing production and imperfect preventive maintenance planning's integration in failure-prone manufacturing systems

    International Nuclear Information System (INIS)

    Aghezzaf, El-Houssaine; Khatab, Abdelhakim; Tam, Phuoc Le

    2016-01-01

    This paper investigates the issue of integrating production and maintenance planning in a failure-prone manufacturing system. It is assumed that the system's operating state is stochastically predictable, in terms of its operating age, and that it can accordingly be preventively maintained during preplanned periods. Preventive maintenance is assumed to be imperfect, that is when performed, it brings the manufacturing system to an operating state that lies between ‘as bad as old’ and ‘as good as new’. Only an overhauling of the system brings it to a ‘as good as new’ operating state again. A practical integrated production and preventive maintenance planning model, that takes into account the system's manufacturing capacity and its operational reliability state, is developed. The model is naturally formulated as a mixed-integer non-linear optimization problem, for which an extended mixed-integer linear reformulation is proposed. This reformulation, while it solves the proposed integrated planning problem to optimality, remains quite demanding in terms of computational time. A fix-and-optimize procedure, that takes advantage of some properties of the original model, is then proposed. The reformulation and the fix-and-optimize procedure are tested on some test instances adapted from those available in the literature. The results show that the proposed fix-and-optimize procedure performs quite well and opens new research direction for future improvements. - Highlights: • Integration of production planning and imperfect preventive maintenance is explored. • Imperfect maintenance is modeled using a fitting age reduction hybrid hazard rate. • A practical approximate optimization model for this integration is proposed. • The resulting naturally MINL optimization model is reformulated and solved as a MILP. • An effective fix-and-optimize procedure is proposed for large instances of this MILP.

  8. Super thermal power plants and environment: a critical appraisal

    International Nuclear Information System (INIS)

    Sharma, A.K.

    1995-01-01

    This paper discusses the possible impact on the environment by the particulate matters, oxides of sulphur and nitrogen, trace metals and solid/liquid wastes, which are emitted during the combustion of coal in the super thermal power plants of National Thermal Power Corporation (NTPC). The coal consumed by these plants have sufficient sulphur content and ash. Of all the mineral in coal, pyrite is one of the most deleterious in combustion and a major source of oxide of sulphur pollution of the atmosphere. The impact of these on the terrestrial and aquatic environment in and around power plants and on region have been discussed. To arresting such contaminants, some remedial measures are suggested. (author). 14 refs., 1 fig., 3 tabs

  9. Probabilistic inhalation risk assessment due to radioactivity released from coal fired thermal power plants

    International Nuclear Information System (INIS)

    Tiwari, M.; Ajmal, P.Y.; Bhangare, R.C.; Sahu, S.K.; Pandit, G.G.

    2014-01-01

    This paper deals with assessment of radiological risk to the general public around in the neighborhood of a 1000 MWe coal-based thermal power plant. We have used Monte Carlo simulation for characterization of uncertainty in inhalation risk due to radionuclide escaping from the stack of thermal power plant. Monte Carlo simulation treats parameters as random variables bound to a given probabilistic distribution to evaluate the distribution of the resulting output. Risk assessment is the process that estimates the likelihood of occurrence of adverse effects to humans and ecological receptors as a result of exposure to hazardous chemical, radiation, and/or biological agents. Quantitative risk characterization involves evaluating exposure estimates against a benchmark of toxicity, such as a cancer slope factor. Risk is calculated by multiplying the carcinogenic slope factor (SF) of the radionuclide by the dose an individual receives. The collective effective doses to the population living in the neighborhood of coal-based thermal power plant were calculated using Gaussian plume dispersion model. Monte Carlo Analysis is the most widely used probabilistic method in risk assessment. The MCA technique treats any uncertain parameter as random variable that obeys a given probabilistic distribution. This technique is widely used for analyzing probabilistic uncertainty. In MCA computer simulation are used to combine multiple probability distributions associated with the dose and SF depicted in risk equation. Thus we get a probabilistic distribution for the risk

  10. Transport of the radionuclides and doses for some coal fired power plants; Transport radionuklida i doze u okolini nekih termoelektrana

    Energy Technology Data Exchange (ETDEWEB)

    Antic, D [Institute of Nuclear Sciences VINCA, Belgrade (Yugoslavia); Telenta, B [Savezni hidrometeoroloski zavod, Belgrade (Yugoslavia); Sokcic-Kostic, M [Institute of Nuclear Sciences VINCA, Belgrade (Yugoslavia)

    1994-07-01

    The radiation exposure of the public in the vicinity of the selected coal fired power plants near from Belgrade has been studied. The contents of natural radionuclides according to experimental data have been used and dose rates from inhalation have been calculated using a two dimensional version of the cloud model. (author)

  11. High-Temperature Graphitization Failure of Primary Superheater Tube

    Science.gov (United States)

    Ghosh, D.; Ray, S.; Roy, H.; Mandal, N.; Shukla, A. K.

    2015-12-01

    Failure of boiler tubes is the main cause of unit outages of the plant, which further affects the reliability, availability and safety of the unit. So failure analysis of boiler tubes is absolutely essential to predict the root cause of the failure and the steps are taken for future remedial action to prevent the failure in near future. This paper investigates the probable cause/causes of failure of the primary superheater tube in a thermal power plant boiler. Visual inspection, dimensional measurement, chemical analysis, metallographic examination and hardness measurement are conducted as the part of the investigative studies. Apart from these tests, mechanical testing and fractographic analysis are also conducted as supplements. Finally, it is concluded that the superheater tube is failed due to graphitization for prolonged exposure of the tube at higher temperature.

  12. LWR nuclear power plant component failures

    International Nuclear Information System (INIS)

    Schmidt, W.H.

    1980-10-01

    An analysis of the most significant light water reactor (LWR) nuclear power plant component failures, from information in the computerized Nuclear Safety Information Center (NSIC) data bank, shows that for both pressurized water reactor (PWR) and boiling water reactor (BWR) plants the component category most responsible for reactor shutdowns is valves. Next in importance for PWR shutdowns is steam generators followed by seals of all kinds. For BWR plants, seals, and pipes and pipe fittings are the second and third most important component failure categories which lead to reactor shutdown. The data are for records extending from early 1972 through September 1978. A list of the most significant component categories and a breakdown of the number of component citations for both PWR and BWR reactor types are presented

  13. Failure and Maintenance Analysis Using Web-Based Reliability Database System

    International Nuclear Information System (INIS)

    Hwang, Seok Won; Kim, Myoung Su; Seong, Ki Yeoul; Na, Jang Hwan; Jerng, Dong Wook

    2007-01-01

    Korea Hydro and Nuclear Power Company has lunched the development of a database system for PSA and Maintenance Rule implementation. It focuses on the easy processing of raw data into a credible and useful database for the risk-informed environment of nuclear power plant operation and maintenance. Even though KHNP had recently completed the PSA for all domestic NPPs as a requirement of the severe accident mitigation strategy, the component failure data were only gathered as a means of quantification purposes for the relevant project. So, the data were not efficient enough for the Living PSA or other generic purposes. Another reason to build a real time database is for the newly adopted Maintenance Rule, which requests the utility to continuously monitor the plant risk based on its operation and maintenance performance. Furthermore, as one of the pre-condition for the Risk Informed Regulation and Application, the nuclear regulatory agency of Korea requests the development and management of domestic database system. KHNP is stacking up data of operation and maintenance on the Enterprise Resource Planning (ERP) system since its first opening on July, 2003. But, so far a systematic review has not been performed to apply the component failure and maintenance history for PSA and other reliability analysis. The data stored in PUMAS before the ERP system is introduced also need to be converted and managed into the new database structure and methodology. This reliability database system is a web-based interface on a UNIX server with Oracle relational database. It is designed to be applicable for all domestic NPPs with a common database structure and the web interfaces, therefore additional program development would not be necessary for data acquisition and processing in the near future. Categorization standards for systems and components have been implemented to analyze all domestic NPPs. For example, SysCode (for a system code) and CpCode (for a component code) were newly

  14. The study of Influencing Maintenance Factors on Failures of Two gypsum Kilns by Failure Modes and Effects Analysis (FMEA

    Directory of Open Access Journals (Sweden)

    Iraj Alimohammadi

    2014-06-01

    Full Text Available Developing technology and using equipment in Iranian industries caused that maintenance system would be more important to use. Using proper management techniques not only increase the performance of production system but also reduce the failures and costs. The aim of this study was to determine the quality of maintenance system and the effects of its components on failures of kilns in two gypsum production companies using Failure Modes and Effects Analysis (FMEA. Furthermore the costs of failures were studied. After the study of gypsum production steps in the factories, FMEA was conducted by the determination of analysis insight, information gathering, making list of kilns’ component and filling up the FMEA’s tables. The effects of failures on production, how to fail, failure rate, failure severity, and control measures were studied. The evaluation of maintenance system was studied by a check list including questions related to system components. The costs of failures were determined by refer in accounting notebooks and interview with the head of accounting department. It was found the total qualities of maintenance system in NO.1 was more than NO.2 but because of lower quality of NO.1’s kiln design, number of failures and their costs were more. In addition it was determined that repair costs in NO.2’s kiln were about one third of NO.1’s. The low severity failures caused the most costs in comparison to the moderate and low ones. The technical characteristics of kilns were appeared to be the most important factors in reducing of failures and costs.

  15. Thermodynamic analysis and economic evaluation of a 1000 MW bituminous coal fired power plant incorporating low-temperature pre-drying (LTPD)

    International Nuclear Information System (INIS)

    Xu, Cheng; Xu, Gang; Zhu, Mingming; Dong, Wei; Zhang, Yang; Yang, Yongping; Zhang, Dongke

    2016-01-01

    Highlights: • An improved design of coal pre-drying using flue gas waste heat was proposed. • 0.4% energy efficiency increase was achieved with the proposed system. • The additional net economic benefit of the proposed system is $1.91 M per year. • Proposed concept can be widely applied to improve coal-fired power plant efficiency. - Abstract: Low-temperature pre-drying (LTPD) of lignite has been identified as an effective approach to improve the efficiency of lignite fired power plants. In this study, an improved concept for the pre-drying of medium moisture bituminous coals using flue gas waste heat was proposed and its feasibility was assessed. In the proposed configuration, the boiler exhaust flue gas is drawn to dryers to heat and pre-dry the raw coal, removing a large proportion of the coal moisture and leading to an improvement in the energy efficiency of the power plant. Thermodynamic analysis and economic evaluation were performed based on a typical 1000 MW bituminous coal fired power plant incorporating the proposed LTPD concept. The results showed that the net power plant efficiency gain is as much as 0.4 percentage point with additional net power output of 9.3 MW as compared to the reference plant without coal pre-drying. This was attributed to the reduction in the moisture content from 10.3 to 2.7 wt%. The additional net economic benefit attained due to the coal pre-drying was estimated to reach $1.91 M per year. This work provides a broadly applicable and economically feasible approach to further improve the energy efficiency of power plants firing coals with medium moisture contents.

  16. Assessment of geothermal assisted coal-fired power generation using an Australian case study

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Cheng [Priority Research Centre for Energy, Discipline of Chemical Engineering, School of Engineering, Faculty of Engineering and Built Environment, The University of Newcastle, Callaghan, NSW 2308 (Australia); Doroodchi, Elham [Priority Research Centre for Advanced Particle Processing and Transport, Discipline of Chemical Engineering, School of Engineering, Faculty of Engineering and Built Environment, The University of Newcastle, Callaghan, NSW 2308 (Australia); Moghtaderi, Behdad [Priority Research Centre for Energy, Discipline of Chemical Engineering, School of Engineering, Faculty of Engineering and Built Environment, The University of Newcastle, Callaghan, NSW 2308 (Australia)

    2014-06-01

    Highlights: • Systematic techno-economic analyses of GAPG system completed for Australian conditions. • Greater utilisation efficiency of both geothermal and fossil fuel resources was achieved. • Reference maps developed to predict conditions when hybrid plant outperforms two stand-alone plants. • Carbon tax and RECs rates of 40 $/tonne and 60 cents/kW h are adequate. • HDR resources should be located no further than 20 km from the plant. - Abstract: A systematic techno-economic analysis of geothermal assisted power generation (GAPG) was performed for a 500 MW unit of a typical coal-fired power plant located at the upper Hunter region of New South Wales, Australia. Specifically, the GAPG viability and performance was examined by investigating the impacts of reservoir temperature, resource distance, hybridisation scheme, and economic conditions including carbon tax and Renewable Energy Certificates (REC). The process simulation package, Aspen HYSYS, was employed for all simulation purposes. Thermodynamically, GAPG system was found to increase the power output of the plant by up to 19% under the booster mode whilst in fuel saving mode the coal consumption reduced by up to 0.3 million tonne/year decreasing the Green House Gas (GHG) emission by up to 15% (0.6 million tonne/year). Economic analyses showed that for a typical HDR resource with a reservoir temperature about 150 °C located within a 5 km radius from the power plant, the GAPG system becomes economically competitive to the stand-alone fossil fuel based plant when minimum carbon tax and RECs rates of 40 $/tonne and 60 cents/kW h are introduced. The figure of merit analyses comparing GAPG system with both stand-alone fossil fuel and stand-alone geothermal plants showed that an economically feasible GAPG system requires the use of HDR resources located no further than 20 km from the plants. Reference maps were also developed to predict suitable conditions for which the hybrid plant outperforms the

  17. Assessment of geothermal assisted coal-fired power generation using an Australian case study

    International Nuclear Information System (INIS)

    Zhou, Cheng; Doroodchi, Elham; Moghtaderi, Behdad

    2014-01-01

    Highlights: • Systematic techno-economic analyses of GAPG system completed for Australian conditions. • Greater utilisation efficiency of both geothermal and fossil fuel resources was achieved. • Reference maps developed to predict conditions when hybrid plant outperforms two stand-alone plants. • Carbon tax and RECs rates of 40 $/tonne and 60 cents/kW h are adequate. • HDR resources should be located no further than 20 km from the plant. - Abstract: A systematic techno-economic analysis of geothermal assisted power generation (GAPG) was performed for a 500 MW unit of a typical coal-fired power plant located at the upper Hunter region of New South Wales, Australia. Specifically, the GAPG viability and performance was examined by investigating the impacts of reservoir temperature, resource distance, hybridisation scheme, and economic conditions including carbon tax and Renewable Energy Certificates (REC). The process simulation package, Aspen HYSYS, was employed for all simulation purposes. Thermodynamically, GAPG system was found to increase the power output of the plant by up to 19% under the booster mode whilst in fuel saving mode the coal consumption reduced by up to 0.3 million tonne/year decreasing the Green House Gas (GHG) emission by up to 15% (0.6 million tonne/year). Economic analyses showed that for a typical HDR resource with a reservoir temperature about 150 °C located within a 5 km radius from the power plant, the GAPG system becomes economically competitive to the stand-alone fossil fuel based plant when minimum carbon tax and RECs rates of 40 $/tonne and 60 cents/kW h are introduced. The figure of merit analyses comparing GAPG system with both stand-alone fossil fuel and stand-alone geothermal plants showed that an economically feasible GAPG system requires the use of HDR resources located no further than 20 km from the plants. Reference maps were also developed to predict suitable conditions for which the hybrid plant outperforms the

  18. Radiological hazard from coal-fired power plants in Poland

    International Nuclear Information System (INIS)

    Nowina-Konopka, M.

    1991-01-01

    The radiobiological hazard of Polish population due to coal combustion for electric power production was assessed. Activity concentrations of the elementary radionuclides in coal and all kinds of ashes were measured. The ATMO computer program was applied to calculate the annual increase of the activity concentration in the air and of the annual increase of activity falling on the ground. Exposition by inhalation, oral ingestion and external irradiation was taken into account. The assessed value of irradiation was taken into account. The assessed value of individual effective dose equivalent commitments for the critical group is 0.1 mSv, i.e. 4% of the total dose rate from natural radiation. The collective effective dose equivalent commitments received of all sources by an inhabitant of Poland as a consequence of annual coal combustion in Polish CPP is 367 manSv/a (i.e. 47 manSv per GWa), i.e. 0.4% of the dose from natural radiation. (author). 11 refs, 3 figs, 8 tabs

  19. Isolation and selection of microalgae from coal fired thermoelectric power plant for biofixation of carbon dioxide

    International Nuclear Information System (INIS)

    Morais, Michele Greque de; Costa, Jorge Alberto Vieira

    2007-01-01

    Global warming is thought to be caused mainly by the emission of carbon dioxide (CO 2 ), with thermoelectric power plants being responsible for about 7% of global CO 2 emissions. Microalgae can reduce CO 2 emissions from thermoelectric power plants, but for this use, they must be resistant to the mixture of gases produced by the power plants. We isolated the microalgae Scenedesmus obliquus and Chlorella kessleri from the waste treatment ponds of the Presidente Medici coal fired thermoelectric power plant in the Southernmost Brazilian state of Rio Grande do Sul and investigated their growth characteristics when exposed to different concentrations of CO 2 . When cultivated with 6% and 12% CO 2 , C. kessleri showed a high maximum specific growth rate (μ max ) of 0.267/day, with a maximum biomass productivity (P max ) of 0.087 g/L/day at 6% CO 2 . For S. obliquus, the highest maximum dry weight biomass value was 1.14 g/L with 12% CO 2 . We also found that these two microalgae also grew well when the culture medium contained up to 18% CO 2 , indicating that they have potential for biofixation of CO 2 in thermoelectric power plants

  20. Assessment of direct radiological risk and indirect associated toxic risks originated by Coal-Fired Power Plants

    OpenAIRE

    Dinis, M. L.; Fiúza, António; Góis, Joaquim; Carvalho, José Soeiro de; Meira Castro, A C

    2011-01-01

    Over the past few decades there has been some discussion concerning the increase of the natural background radiation originated by coal-fired power plants, due to the uranium and thorium content present in combustion ashes. The radioactive decay products of uranium and thorium, such as radium, radon, polonium, bismuth and lead, are also released in addition to a significant amount of 40K. Since the measurement of radioactive elements released by the gaseous emissions of coal power plants i...

  1. ANALYSIS OF RELIABILITY OF NONRECTORABLE REDUNDANT POWER SYSTEMS TAKING INTO ACCOUNT COMMON FAILURES

    Directory of Open Access Journals (Sweden)

    V. A. Anischenko

    2014-01-01

    Full Text Available Reliability Analysis of nonrestorable redundant power Systems of industrial plants and other consumers of electric energy was carried out. The main attention was paid to numbers failures influence, caused by failures of all elements of System due to one general reason. Noted the main possible reasons of common failures formation. Two main indicators of reliability of non-restorable systems are considered: average time of no-failure operation and mean probability of no-failure operation. Modeling of failures were carried out by mean of division of investigated system into two in-series connected subsystems, one of them indicated independent failures, but the other indicated common failures. Due to joined modeling of single and common failures resulting intensity of failures is the amount incompatible components: intensity statistically independent failures and intensity of common failures of elements and system in total.It is shown the influence of common failures of elements on average time of no-failure operation of system. There is built the scale of preference of systems according to criterion of  average time maximum of no-failure operation, depending on portion of common failures. It is noticed that such common failures don’t influence on the scale of preference, but  change intervals of time, determining the moments of systems failures and excepting them from the number of comparators. There were discussed two problems  of conditionally optimization of  systems’  reservation choice, taking into account their reliability and cost. The first problem is solved due to criterion of minimum cost of system providing mean probability of no-failure operation, the second problem is solved due to criterion of maximum of mean probability of no-failure operation with cost limitation of system.

  2. Fossil fuel-fired power generation. Case studies of recently constructed coal- and gas-fired plants

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, C. [IEA Clean Coal Centre, London (United Kingdom)

    2007-10-23

    To meet future energy demand growth and replace older or inefficient units, a large number of fossil fuel-fired plants will be required to be built worldwide in the next decade. Yet CO{sub 2} emissions from fossil-fired power generation are a major contributor to climate change. As a result, new plants must be designed and operated at highest efficiency both to reduce CO{sub 2} emissions and to facilitate deployment of CO{sub 2} capture and storage in the future. The series of case studies in this report, which respond to a request to the IEA from the G8 Summit in July 2005, were conducted to illustrate what efficiency is achieved now in modern plants in different parts of the world using different grades of fossil fuels. The plants were selected from different geographical areas, because local factors influence attainable efficiency. The case studies include pulverized coal combustion (PCC) with both subcritical and supercritical (very high pressure and temperature) steam turbine cycles, a review of current and future applications of coal-fuelled integrated gasification combined cycle plants (IGCC), and a case study of a natural gas fired combined cycle plant to facilitate comparisons. The results of these analyses show that the technologies for high efficiency (low CO{sub 2} emission) and very low conventional pollutant emissions (particulates, SO{sub 2}, NOx) from fossil fuel-fired power generation are available now through PCC, IGCC or NGCC at commercially acceptable cost. This report contains comprehensive technical and indicative cost information for modern fossil fuel-fired plants that was previously unavailable. It serves as a valuable sourcebook for policy makers and technical decision makers contemplating decisions to build new fossil fuel-fired power generation plants.

  3. Analysis of power ramp rate and minimum power controllability of the MMS model for a plant dynamics analysis of a Prototype SFR

    International Nuclear Information System (INIS)

    Kim, Eui Kwang; Kim, Dehee; Joo, Hyungkook; Lee, Taeho

    2014-01-01

    A full plant dynamic model was developed for a prototype SFR using the Modular Modeling System (MMS). It includes the modeling of various subsystems such as the neutronics, primary and intermediate sodium systems of the NSSS, steam and water systems of the BOP, BOP controls, and the supervisory plant controls. The NSSS model is subdivided into component models, such as a Core, IHXs, Pumps, SGs, and the rest of the NSSS loop model. The BOP model is subdivided into a steam subsystem, feedwater subsystem, and preheater subsystem. Plant transient tests were performed to study the operational considerations. It includes varying the power ramp rate and studying the controllability at minimum power. Plant transient tests were performed to study operational considerations by using the MMS model for a prototype SFR. It includes varying the power ramp rate, studying the controllability at the minimum power set point. At a power ramp rate of higher than 2%, the steam temperature has a large deviation from the target. As the power set point decreases, the PHTS hot leg temperature and steam temperature tend to have higher deviations. After further refinement of the MMS model, it can be useful for developing the plant operation logics of the prototype SFR

  4. Corrosion Investigations in Straw-Fired Power Plants in Denmark

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Frandsen, Flemming; Karlsson, A

    2001-01-01

    of accelerated corrosion. The type of corrosion attack can be directly ascribed to the composition of the deposit and the metal surface temperature. A series of field tests have been undertaken in the various straw-fired power plants in Denmark, namely the Masnedø, Rudkøbing and Ensted CHP plants. Three types......In Denmark, straw and other types of biomass are used for generating energy in power plants. Straw has the advantage that it is a "carbon dioxide neutral fuel" and therefore environmentally acceptable. Straw combustion is associated with corrosion problems which are not encountered in coal-fired...... of exposure were undertaken to investigate corrosion: a) the exposure of metal rings on water/air cooled probes, b) the exposure of test tubes in a test superheater, and c) the exposure of test tubes in existing superheaters. Thus both austenitic steels and ferritic steels were exposed in the steam...

  5. Radiation exposure potential from coal-fired power plants in Romania

    International Nuclear Information System (INIS)

    Botezatu, E.; Grecea, C.; Botezatu, G.; Capitanu, O.; Peic, T.; Sandor, G.

    1996-01-01

    In the investigated power plants they burn brown coal, lignite and/or mixture of different kinds of coal: brown coal, lignite, pit coal, pitch coal, bituminous coal. The activity concentrations measured in the coal samples varied over two orders of magnitude. The natural radionuclide concentrations in fly ash are significantly higher than the corresponding Concentrations in the coal. The normalized discharged activities for the investigated power plants are much higher than those estimated in the UNSCEAR 1988 Report for typical old and modern plants. Firstly, accounting for this is the low ash retention efficiency of the particulate control devices of power stations, especially for the older ones, and secondly, the high ash content of the coal: 26-60%. The low quality of coal leads to the higher coal consumption; thus the combustion of up to 20.109 Kg of coal is required to produce 1 Gwa of electrical energy. As a result, the activities of radon-222 and of radon-220 released per Gwa have been assessed at 25 to 770 GBq. (author)

  6. Simulation and parametric optimisation of thermal power plant cycles

    Directory of Open Access Journals (Sweden)

    P. Ravindra Kumar

    2016-09-01

    Full Text Available The objective of the paper is to analyse parametric studies and optimum steam extraction pressures of three different (subcritical, supercritical and ultra-supercritical coal fired power plant cycles at a particular main steam temperature of 600 °C by keeping the reheat temperature at 537 °C and condenser pressure at 0.09 bar as constant. In order to maximize the heat rate gain possible with supercritical and ultra-supercritical steam conditions, eight stages of feed water heater arrangement with single reheater is considered. The system is optimized in such a way that the percentage exergetic losses are reduced for the increase of the exergetic efficiency and higher fuel utilization. The plant cycles are simulated and optimized by using Cycle Tempo 5.0 simulation software tool. From the simulation study, it is observed that the thermal efficiency of the three different power plant cycles obtained as 41.40, 42.48 and 43.03%, respectively. The specific coal consumption for three different power plant cycles are 0.56, 0.55 and 0.54 Tonnes/MWh. The improvement in feed water temperatures at the inlet of steam generator of respective cycles are 291, 305 and 316 °C.

  7. A study of common-mode failures

    International Nuclear Information System (INIS)

    Edwards, G.T.; Watson, I.A.

    1979-07-01

    The purpose of the report is to investigate problems of the identification of the common failure mode (CFM) the reliability models used and the data required for their solution, particularly with regard to automatic protection systems for nuclear reactors. The available literature which was surveyed during the study is quoted and used as a basis for the main work of the study. The type of redundancy system under consideration is initially described and the types of CFM to which these systems are prone are identified before a general definition of the term 'common mode failure' is proposed. The definition and proposed classification system for CMF are based on the common cause of failure, so identifying the primary events. Defences against CFM are included and proposals for an overall strategy and detailed recommendations for design and operation are made. Common mode failures in US nuclear reactor systems, aircraft systems, and other sources including chemical plant systems are surveyed. The data indicates the importance of the human error problem in the causes of CMF in design, maintenance and operation. From a study of the collected data a redundancy sub-system model for CMF is developed which identifies three main categories of failure, non-recurrent engineering design errors, maintenance and test errors, and random interest events. The model proposed allows for the improvement in sub-system reliability where appropriate defences are applied. (author)

  8. Analysis of gross error rates in operation of commercial nuclear power stations

    International Nuclear Information System (INIS)

    Joos, D.W.; Sabri, Z.A.; Husseiny, A.A.

    1979-01-01

    Experience in operation of US commercial nuclear power plants is reviewed over a 25-month period. The reports accumulated in that period on events of human error and component failure are examined to evaluate gross operator error rates. The impact of such errors on plant operation and safety is examined through the use of proper taxonomies of error, tasks and failures. Four categories of human errors are considered; namely, operator, maintenance, installation and administrative. The computed error rates are used to examine appropriate operator models for evaluation of operator reliability. Human error rates are found to be significant to a varying degree in both BWR and PWR. This emphasizes the import of considering human factors in safety and reliability analysis of nuclear systems. The results also indicate that human errors, and especially operator errors, do indeed follow the exponential reliability model. (Auth.)

  9. Coal-fired high performance power generating system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-31

    As a result of the investigations carried out during Phase 1 of the Engineering Development of Coal-Fired High-Performance Power Generation Systems (Combustion 2000), the UTRC-led Combustion 2000 Team is recommending the development of an advanced high performance power generation system (HIPPS) whose high efficiency and minimal pollutant emissions will enable the US to use its abundant coal resources to satisfy current and future demand for electric power. The high efficiency of the power plant, which is the key to minimizing the environmental impact of coal, can only be achieved using a modern gas turbine system. Minimization of emissions can be achieved by combustor design, and advanced air pollution control devices. The commercial plant design described herein is a combined cycle using either a frame-type gas turbine or an intercooled aeroderivative with clean air as the working fluid. The air is heated by a coal-fired high temperature advanced furnace (HITAF). The best performance from the cycle is achieved by using a modern aeroderivative gas turbine, such as the intercooled FT4000. A simplified schematic is shown. In the UTRC HIPPS, the conversion efficiency for the heavy frame gas turbine version will be 47.4% (HHV) compared to the approximately 35% that is achieved in conventional coal-fired plants. This cycle is based on a gas turbine operating at turbine inlet temperatures approaching 2,500 F. Using an aeroderivative type gas turbine, efficiencies of over 49% could be realized in advanced cycle configuration (Humid Air Turbine, or HAT). Performance of these power plants is given in a table.

  10. Environmental impact assessment of coal power plants in operation

    Directory of Open Access Journals (Sweden)

    Bartan Ayfer

    2017-01-01

    Full Text Available Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS. The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  11. Environmental impact assessment of coal power plants in operation

    Science.gov (United States)

    Bartan, Ayfer; Kucukali, Serhat; Ar, Irfan

    2017-11-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS). The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  12. A Study of Coal Fire Propagation with Remotely Sensed Thermal Infrared Data

    Directory of Open Access Journals (Sweden)

    Hongyuan Huo

    2015-03-01

    Full Text Available Coal fires are a common and serious problem in most coal-bearing countries. Thus, it is very important to monitor changes in coal fires. Remote sensing provides a useful technique for investigating coal fields at a large scale and for detecting coal fires. In this study, the spreading direction of a coal fire in the Wuda Coal Field (WCF, northwest China, was analyzed using multi-temporal Landsat Thematic Mapper (TM and Enhanced Thematic Mapper (ETM+ thermal infrared (TIR data. Using an automated method and based on the land surface temperatures (LST that were retrieved from these thermal data, coal fires related to thermal anomalies were identified; the locations of these fires were validated using a coal fire map (CFM that was developed via field surveys; and the cross-validation of the results was also carried out using the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER thermal infrared images. Based on the results from longtime series of satellite TIR data set, the spreading directions of the coal fires were determined and the coal fire development on the scale of the entire coal field was predicted. The study delineated the spreading direction using the results of the coal fire dynamics analysis, and a coal fire spreading direction map was generated. The results showed that the coal fires primarily spread north or northeast in the central part of the WCF and south or southwest in the southern part of the WCF. In the northern part of the WCF, some coal fires were spreading north, perhaps coinciding with the orientation of the coal belt. Certain coal fires scattered in the northern and southern parts of the WCF were extending in bilateral directions. A quantitative analysis of the coal fires was also performed; the results indicate that the area of the coal fires increased an average of approximately 0.101 km2 per year.

  13. Preventive maintenance basis: Volume 37 -- Main turbine EHC hydraulics. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-11-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to the main turbine EHC hydraulic fluid and associated components. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  14. Just In-Time Maintenance of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    DR. Alexander G. Parlos

    2002-01-22

    The goal of this project has been to develop and demonstrate the feasibility of a new technology for maintenance engineering: a Just-In-Time Maintenance (JITM) system for rotating machines. The JITM system is based on several key developments at Texas A and M over the past ten years in emerging intelligent information technologies, which if integrated into a single system could provide a revolutionary approach in the way maintenance is performed. Rotating machines, such as induction motors, range from a few horse power (hp) to several thousand hp in size, and they are widely used in nuclear power plants and in other industries. Forced outages caused by induction motor failures are the reason for as much as 15% - 40% of production costs to be attributable to maintenance, whereas plant shutdowns caused by induction motor failures result in daily financial losses to the utility and process industries of $1 M or more. The basic components of the JITM system are the available machine sensors, that is electric current sensors and accelerometers, and the computational algorithms used in the analysis and interpretation of the occurring incipient failures. The JITM system can reduce the costs attributable to maintenance by about 40% and it can lower the maintenance budgets of power and process plants by about 35%, while requiring no additional sensor installation. As a result, the JITM system can improve the competitiveness of US nuclear utilities at minimal additional cost.

  15. Just In-Time Maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Parlos, Alexander G.

    2002-01-01

    The goal of this project has been to develop and demonstrate the feasibility of a new technology for maintenance engineering: a Just-In-Time Maintenance (JITM) system for rotating machines. The JITM system is based on several key developments at Texas A and M over the past ten years in emerging intelligent information technologies, which if integrated into a single system could provide a revolutionary approach in the way maintenance is performed. Rotating machines, such as induction motors, range from a few horse power (hp) to several thousand hp in size, and they are widely used in nuclear power plants and in other industries. Forced outages caused by induction motor failures are the reason for as much as 15% - 40% of production costs to be attributable to maintenance, whereas plant shutdowns caused by induction motor failures result in daily financial losses to the utility and process industries of $1 M or more. The basic components of the JITM system are the available machine sensors, that is electric current sensors and accelerometers, and the computational algorithms used in the analysis and interpretation of the occurring incipient failures. The JITM system can reduce the costs attributable to maintenance by about 40% and it can lower the maintenance budgets of power and process plants by about 35%, while requiring no additional sensor installation. As a result, the JITM system can improve the competitiveness of US nuclear utilities at minimal additional cost

  16. Comparison of Sprint Fidelis and Riata defibrillator lead failure rates.

    Science.gov (United States)

    Fazal, Iftikhar A; Shepherd, Ewen J; Tynan, Margaret; Plummer, Christopher J; McComb, Janet M

    2013-09-30

    Sprint Fidelis and Riata defibrillator leads are prone to early failure. Few data exist on the comparative failure rates and mortality related to lead failure. The aims of this study were to determine the failure rate of Sprint Fidelis and Riata leads, and to compare failure rates and mortality rates in both groups. Patients implanted with Sprint Fidelis leads and Riata leads at a single centre were identified and in July 2012, records were reviewed to ascertain lead failures, deaths, and relationship to device/lead problems. 113 patients had Sprint Fidelis leads implanted between June 2005 and September 2007; Riata leads were implanted in 106 patients between January 2003 and February 2008. During 53.0 ± 22.3 months of follow-up there were 13 Sprint Fidelis lead failures (11.5%, 2.60% per year) and 25 deaths. Mean time to failure was 45.1 ± 15.5 months. In the Riata lead cohort there were 32 deaths, and 13 lead failures (11.3%, 2.71% per year) over 54.8 ± 26.3 months follow-up with a mean time to failure of 53.5 ± 24.5 months. There were no significant differences in the lead failure-free Kaplan-Meier survival curve (p=0.77), deaths overall (p=0.17), or deaths categorised as sudden/cause unknown (p=0.54). Sprint Fidelis and Riata leads have a significant but comparable failure rate at 2.60% per year and 2.71% per year of follow-up respectively. The number of deaths in both groups is similar and no deaths have been identified as being related to lead failure in either cohort. Copyright © 2012. Published by Elsevier Ireland Ltd.

  17. [Emission Characteristics of Water-Soluble Ions in Fumes of Coal Fired Boilers in Beijing].

    Science.gov (United States)

    Hu, Yue-qi; Ma, Zhao-hui; Feng, Ya-jun; Wang, Chen; Chen, Yuan-yuan; He, Ming

    2015-06-01

    Selecting coal fired boilers with typical flue gas desulfurization and dust extraction systems in Beijing as the study objects, the issues and characteristics of the water-soluble ions in fumes of coal fired boilers and theirs influence factors were analyzed and evaluated. The maximum mass concentration of total water-soluble ions in fumes of coal fired boilers in Beijing was 51.240 mg x m(-3) in the benchmark fume oxygen content, the minimum was 7.186 mg x m(-3), and the issues of the water-soluble ions were uncorrelated with the fume moisture content. SO4(2-) was the primary characteristic water-soluble ion for desulfurization reaction, and the rate of contribution of SO4(2-) in total water-soluble ions ranged from 63.8% to 81.0%. F- was another characteristic water-soluble ion in fumes of thermal power plant, and the rate of contribution of F- in total water-soluble ions ranged from 22.2% to 32.5%. The fume purification technologies significantly influenced the issues and the emission characteristics of water-soluble ions in fumes of coal fired boilers. Na+ was a characteristic water-soluble ion for the desulfurizer NaOH, NH4+ and NO3+ were characteristic for the desulfurizer NH4HCO3, and Mg2+ was characteristic for the desulfurizer MgO, but the Ca2+ emission was not increased by addition of the desulfurizer CaO or CaCO3 The concentrations of NH4+ and NO3- in fumes of thermal power plant were lower than those in fumes of industrial or heating coal fired boilers. The form of water-soluble ions was significantly correlated with fume temperature. The most water-soluble ions were in superfine state at higher fume temperature and were not easily captured by the filter membrane.

  18. Expanding exports, increasing smog : Ontario Power Generation's and Hydro One's strategies to continue coal-fired electricity generation in Ontario

    International Nuclear Information System (INIS)

    Gibbons, J.

    2002-06-01

    The production of coal-fired electricity increased by approximately 150 per cent in Ontario between 1995 and 2000. As a result, the smog-causing emissions generated by the five coal-fired power plants operated by Ontario Power Generation caused an increase in smog and worsened air quality in the province as well as affecting air quality as far afield as the Atlantic provinces. Between 2002 and 2005, it is expected that the Pickering and Bruce nuclear plants will be returned to service, making the electricity generated by the coal plants surplus to Ontario's needs. Increasing this surplus are the planned natural gas generating stations. Ontario Power Generation is planning on using this surplus to export it to the United States rather than phasing out its reliance on coal. The increase in exports to the United States Northeast and Midwest is planned with Hydro One, already busy increasing its transmission capacity to the United States by 1,000 megawatt (MW). This plan involves laying 975 MW submarine cable from the Nanticoke Generating Station (operated by Ontario Power Generation) under Lake Erie to Pennsylvania, Ohio, or both states. At the moment, the exports are constrained by the government emissions limits imposed by the Ontario government on sulphur dioxide and nitrogen oxides. This constraint could be removed if Ontario Power Generation decides to pay further for pollution controls for sulphur dioxide and nitrogen oxides at its coal stations. Unfortunately, increasing the exports would also result in emissions increases for 28 other uncapped pollutants such as lead, mercury and arsenic. The author recommended that the Ontario government ban non-emergency coal-fired electricity exports to improve air quality in the province. refs., 8 figs

  19. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  20. Specification and qualification of fire detectors used in very high radiation rooms at the Angra-2 nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Sá, Luís Gustavo S.; Oliveira, Alisson S. de; Donorato, Fernando da S.; Oliveira, Marcos Vinicius M. de, E-mail: luisg@eletronuclear.gov.br, E-mail: alison@eletronuclear.gov.br, E-mail: donora@eletronuclear.gov.br, E-mail: marcoso@eletronuclear.gov.br [Eletrobrás Termonuclear S.A. (ELETRONUCLEAR), Angra dos Reis, RJ (Brazil). Departamento GDD.O

    2017-07-01

    During the Operation cycle 11 of the Angra-2 Nuclear Power Plant, faults were observed in the optical and ionic fire detectors models installed in very high radiation rooms (pump reactor rooms and sump containment). It was observed that these models were already obsolete and no available for purchase. In addition, as during the operation cycle these rooms are not accessible for maintenance because of the high dose rates, corrective measures only were taken at Outage 2P11 where all detectors were replaced by the new neural fire detector model. This high-tech model was not sufficiently resistant to the high dose rates of the environment rooms and starts to fail in the beginning of the cycle 11. Thereafter, a specific engineering work was developed in partnership with IPEN - Institute of Energy and Nuclear Research to specify and qualify a new model compatible with the electronic Central of the Fire Detection System and Alarm and at the same time resistant to radiation. The fire detectors were subjected to a known gamma radiation rate at the laboratory facilities of IPEN through the gamma irradiation equipment with cobalt radiation source. In this way, it was possible to determine its useful life comparing the total dose absorbed for detector failure and the environmental dose where it was installed in Angra-2. The current approved model was installed during Outage 2P13, and until now, no spurious alarms or failure were observed during the current cycle. (author)

  1. A study of toxic emissions from a coal-fired power plant utilizing an ESP while demonstrating the ICCT CT-121 FGD Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-16

    The US Department of Energy is performing comprehensive assessments of toxic emissions from eight selected coal-fired electric utility units. This program responds to the Clean Air Act Amendments of 1990, which require the US Environmental Protection Agency (EPA) to evaluate emissions of hazardous air pollutants (HAPs) from electric utility power plants for Potential health risks. The resulting data will be furnished to EPA utility power plants and health risk determinations. The assessment of emissions involves the collection and analysis of samples from the major input, process, and output streams of each of the eight power plants for selected hazardous Pollutants identified in Title III of the Clean Air Act. Additional goals are to determine the removal efficiencies of pollution control subsystems for these selected pollutants and the Concentrations associated with the particulate fraction of the flue gas stream as a function of particle size. Material balances are being performed for selected pollutants around the entire power plant and several subsystems to identify the fate of hazardous substances in each utility system. Radian Corporation was selected to perform a toxics assessment at a plant demonstrating an Innovative Clean Coal Technology (ICCT) Project. The site selected is Plant Yates Unit No. 1 of Georgia Power Company, which includes a Chiyoda Thoroughbred-121 demonstration project.

  2. High temperature corrosion in straw-fired power plants: Influence of steam/metal temperature on corrosion rates for TP347H

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Biede, O; Larsen, OH

    2002-01-01

    The corrosion in straw-fired boilers has been investigated at various straw-fired power plants in Denmark. Water/air-cooled probes, a test superheater and test sections removed from the actual superheater have been utilised to characterise corrosion and corrosion rates. This paper describes...... the corrosion rates measured for the TP347H type steel. The corrosion morphology at high temperature consists of grain boundary attack and selective attack of chromium. The corrosion rate increases with calculated metal temperature (based on steam temperature), however there is great variation within....... The difference in the results could be traced back to a lower flue gas temperature on one side of the boiler. Although metal temperature is the most important parameter with respect to corrosion rate, flue gas temperature also plays an important role. Efforts to quantify the effect of flue gas temperature...

  3. Environmental risk assessment of airborne emission from chinese coal-fired power plants with public health detriment criteria

    International Nuclear Information System (INIS)

    He Huimin; Pan Ziqiang; Zhang Yongxing; Xia Yihua

    1997-01-01

    On the basis of investigation of types of dust removers and their efficiency in Chinese coal-fired power plants, human health detriment of airborne non-radioactive and radioactive emissions from the power plants is assessed with public health detriment assessment method. The results show that the risk is primarily from airborne non-radioactive emission

  4. Data analysis using the Binomial Failure Rate common cause model

    International Nuclear Information System (INIS)

    Atwood, C.L.

    1983-09-01

    This report explains how to use the Binomial Failure Rate (BFR) method to estimate common cause failure rates. The entire method is described, beginning with the conceptual model, and covering practical issues of data preparation, treatment of variation in the failure rates, Bayesian estimation of the quantities of interest, checking the model assumptions for lack of fit to the data, and the ultimate application of the answers

  5. Data book of the component failure rate stored in the RECORD

    International Nuclear Information System (INIS)

    Oikawa, Testukuni; Sasaki, Shinobu; Hikawa, Michihiro; Higuchi, Suminori.

    1989-04-01

    The Japan Atomic Energy Research Insitute (JAERI) has developed a computerized component reliability data base and its retrieval system, RECORD, on collected failure rates from published literatures in order to promote convenience and efficiency of systems reliability analysis in the PSA (Probabilistic Safety Assessment). In order to represent collected failure rates in a uniform format, codes are defined for component category, failure mode, data source, unit of failure rate and statistocal parameter. Up to now, approximately 11,500 pieces of component failure rate data from about 35 open literatures have been stored in the RECORD. This report provides the failure rate stored in the RECORD data base for the usage by systems analysts, as well as brief descriptions about the data base structure and how to use this data book. (author)

  6. Enhancing mercury removal across air pollution control devices for coal-fired power plants by desulfurization wastewater evaporation.

    Science.gov (United States)

    Bin, Hu; Yang, Yi; Cai, Liang; Yang, Linjun; Roszak, Szczepan

    2017-10-09

    Desulfurization wastewater evaporation technology is used to enhance the removal of gaseous mercury (Hg) in conventional air pollution control devices (APCDs) for coal-fired power plants. Studies have affirmed that gaseous Hg is oxidized and removed by selective catalytic reduction (SCR), an electrostatic precipitator (ESP) and wet flue gas desulfurization (WFGD) in a coal-fired thermal experiment platform with WFGD wastewater evaporation. Effects of desulfurization wastewater evaporation position, evaporation temperature and chlorine ion concentration on Hg oxidation were studied as well. The Hg 0 oxidation efficiency was increased ranging from 30% to 60%, and the gaseous Hg removal efficiency was 62.16% in APCDs when wastewater evaporated before SCR. However, the Hg 0 oxidation efficiency was 18.99% and the gaseous Hg removal efficiency was 40.19% in APCDs when wastewater evaporated before ESP. The results show that WFGD wastewater evaporation before SCR is beneficial to improve the efficiency of Hg oxidized and removed in APCDs. Because Hg 2+ can be easily removed in ACPDs and WFGD wastewater in power plants is enriched with chlorine ions, this method realizes WFGD wastewater zero discharge and simultaneously enhances Hg removal in APCDs.

  7. Atmospheric dispersion modeling of primary pollutants from electric power plants: Application to a coal-fired power plant

    International Nuclear Information System (INIS)

    McIlvaine, C.M.

    1994-01-01

    The normal operation of a power plant generally releases pollutants to the atmosphere. The objective of this paper is to describe a modeling method to estimate the changes in air pollutant concentrations that result from these emissions. This modeling approach is applicable to coal, biomass, oil, and natural gas technologies. As an example, this paper uses a hypothetical 500 megawatt (MW) coal-fired power plant, located at a Southeast Reference site in the U.S. and at a Southwest Reference Site. The pollutants resulting from the operation of the power plant may be classified as primary (emitted directly from the plant) or secondary (formed in the atmosphere from primary pollutants). The primary pollutants of interest in this paper are nitrogen oxides (NO x , sulfur dioxide SO 2 , particulate matter and metals

  8. Measurement of natural radioactivity and assessment of associated radiation hazards in soil around Baoji second coal-fired thermal power plant (China)

    International Nuclear Information System (INIS)

    Lu, X.; Li, X.; Yun, P.; Luo, D.; Wang, L.; Ren, C.; Chen, C.

    2012-01-01

    Activity concentrations of natural radionuclides 226 Ra, 232 Th and 40 K in soil around Baoji Second coal-fired thermal power plant of China were determined using gamma ray spectrometry. The mean activity concentrations of 226 Ra, 232 Th and 40 K in soil were found to be 40.3±3.5, 59.6±3.1 and 751.2±12.4 Bq kg -1 , respectively, which are all higher than the corresponding average values in Shaanxi, Chinese and world soil. The radium equivalent activity (Ra eq), the air absorbed dose rate (D), the annual effective dose (E), the external hazard index (H ex) and internal hazard index (H in) were evaluated and compared with the internationally reported or reference values. All the soil samples have Ra eq lower than the limit of 370 Bq kg -1 and H ex and H in less than unity. The overall mean outdoor terrestrial gamma air absorbed dose rate is ∼86.6±3.4 nGy h -1 and the corresponding outdoor annual effective dose is 0.106±0.004 mSv, which is higher than the worldwide average (0.07 mSv y -1 ) for outdoors annual effective dose. (authors)

  9. Failure mechanism for thermal fatigue of thermal barrier coating systems

    Energy Technology Data Exchange (ETDEWEB)

    Giolli, C.; Scrivani, A.; Rizzi, G. [Turbocoating S.p.A., Rubbiano di Solignano (Italy); Borgioli, F. [Firenze Univ., Sesto Fiorentino (Italy); Bolelli, G.; Lusvarghi, L. [Univ. di Modena e Reggio Emilia, Modena (Italy)

    2008-07-01

    High temperature thermal fatigue causes the failure of Thermal Barrier Coating (TBC) systems. Due to the difference in thickness and microstructure between thick TBCs and traditional thin TBCs, they cannot be assumed a-priori to possess the same failure mechanisms. Thick TBCs, consisting of a CoNiCrAlY bond coat and Yttria Partially Stabilised Zirconia top coat with different values of porosity, were produced by Air Plasma Spray. Thermal fatigue resistance limit of TBCs was tested by Furnace Cycling Tests (FCT) according to the specifications of an Original Equipment Manufacturer (OEM). TBC systems were analyzed before and after FCT. The morphological and chemical evolution of CoNiCrAlY/TGO microstructure was studied. Sintering effect, residual stress, phase transformation and fracture toughness were evaluated in the ceramic Top Coat. All the tested samples passed FCT according to the specification of an important OEM. Thermal fatigue resistance increases with the amount of porosity in the top coat. The compressive in-plane stresses increase in the TBC systems after thermal cycling, nevertheless the increasing rate has a trend contrary to the porosity level of top coat. The data suggest that the spallation happens at the TGO/Top Coat interface. The failure mechanism of thick TBCs subjected to thermal fatigue was eventually found to be similar to the failure mechanism of thin TBC systems made by APS. (orig.)

  10. An advanced maintenance advisory and surveillance system for boiler tubes - AMASS

    Energy Technology Data Exchange (ETDEWEB)

    Tomkins, A B [ERA Technology Ltd, Leatherhead (United Kingdom)

    1999-12-31

    In a recently completed European collaborative project, the aim was to address the issue of boiler tube failures and thereby plant availability. The reduction of forced outages due to component failures and the reduction of planned outages for preventative maintenance can both contribute in this respect. It has been possible to assess tube degradation due to erosion, corrosion and overheating through the use of on-line techniques (thin layer activation, corrosion probes and novel temperature sensors) and off-line techniques (cold air velocity measurements, laser shearography and measurements of steam side oxide) which have been developed in the project. These techniques have been demonstrated on an oil fired boiler in Portugal and a coal fired unit in Spain. The output from the monitoring techniques has been integrated in the AMASS maintenance advisory and surveillance system. This is a computerised system comprising a spatial database with add-on tools designed to assess data from individual monitors and to provide the user with information on tube life utilisation rates and the probability of tube failure occurring. A description of the monitoring techniques will be described along with some of the results of demonstrating them in the field. Also an overview of the computerized system and the way in which it works will be given along with examples of how it can be used to assist with preventative maintenance and to help avoid unplanned outages. (orig.) 10 refs.

  11. An advanced maintenance advisory and surveillance system for boiler tubes - AMASS

    Energy Technology Data Exchange (ETDEWEB)

    Tomkins, A.B. [ERA Technology Ltd, Leatherhead (United Kingdom)

    1998-12-31

    In a recently completed European collaborative project, the aim was to address the issue of boiler tube failures and thereby plant availability. The reduction of forced outages due to component failures and the reduction of planned outages for preventative maintenance can both contribute in this respect. It has been possible to assess tube degradation due to erosion, corrosion and overheating through the use of on-line techniques (thin layer activation, corrosion probes and novel temperature sensors) and off-line techniques (cold air velocity measurements, laser shearography and measurements of steam side oxide) which have been developed in the project. These techniques have been demonstrated on an oil fired boiler in Portugal and a coal fired unit in Spain. The output from the monitoring techniques has been integrated in the AMASS maintenance advisory and surveillance system. This is a computerised system comprising a spatial database with add-on tools designed to assess data from individual monitors and to provide the user with information on tube life utilisation rates and the probability of tube failure occurring. A description of the monitoring techniques will be described along with some of the results of demonstrating them in the field. Also an overview of the computerized system and the way in which it works will be given along with examples of how it can be used to assist with preventative maintenance and to help avoid unplanned outages. (orig.) 10 refs.

  12. Adapting sustainable low-carbon techologies to reduce carbon dioxide emissions from coal-fired power plants in China

    Science.gov (United States)

    Kuo, Peter Shyr-Jye

    1997-09-01

    The scientific community is deeply concerned about the effect of greenhouse-gases (GHGs) on global climate change. A major climate shift can result in tragic destruction to our world. Carbon dioxide (COsb2) emissions from coal-fired power plants are major anthropogenic sources that contribute to potential global warming. The People's Republic of China, with its rapidly growing economy and heavy dependence on coal-fired power plants for electricity, faces increasingly serious environmental challenges. This research project seeks to develop viable methodologies for reducing the potential global warming effects and serious air pollution arising from excessive coal burning. China serves as a case study for this research project. Major resolution strategies are developed through intensive literature reviews to identify sustainable technologies that can minimize adverse environmental impacts while meeting China's economic needs. The research thereby contributes technological knowledge to the field of Applied Sciences. The research also integrates modern power generation technologies with China's current and future energy requirements. With these objectives in mind, this project examines how China's environmental issues are related to China's power generation methods. This study then makes strategic recommendations that emphasize low-carbon technologies as sustainable energy generating options to be implemented in China. These low-carbon technologies consist of three options: (1) using cleaner fuels converted from China's plentiful domestic coal resources; (2) applying high-efficiency gas turbine systems for power generation; and (3) integrating coal gasification processes with energy saving combined cycle gas turbine systems. Each method can perform independently, but a combined strategy can achieve the greatest COsb2 reductions. To minimize economic impacts caused by technological changes, this study also addresses additional alternatives that can be implemented in

  13. Emergency ac power systems operating experience at U.S. nuclear power plants - 1976 through 1983

    Energy Technology Data Exchange (ETDEWEB)

    Battle, R. E. [Oak Ridge National Laboratory, Oak Ridge, Tennessee (United States)

    1986-02-15

    Success and failure data of test and emergency starts of emergency ac power sources (diesel generators) at U.S. nuclear power plants were collected and evaluated to estimate diesel generator reliability parameters. A regression analysis of the estimates of the probability of failure to start based on surveillance test data from 1976 through 1983 indicates that the probability of failure to start has been decreasing. However, the reliability of diesel generator performance during losses of off-site power for 1981 through 1983 was less than expected based on the test data estimates. The failures that occurred during losses of off-site power were reviewed to determine why the calculated failure to start was greater than expected, and possible explanations for this high value are presented. The subsystems involved In diesel generator subsystem failures were categorized to determine whether there were any dominant failure modes. The results indicate that further significant Improvement in diesel generator reliability will require improvement of many subsystems. (author)

  14. Simulation of a coal-fired power plant using mathematical programming algorithms in order to optimize its efficiency

    International Nuclear Information System (INIS)

    Tzolakis, G.; Papanikolaou, P.; Kolokotronis, D.; Samaras, N.; Tourlidakis, A.; Tomboulides, A.

    2012-01-01

    Since most of the world's electric energy production is mainly based on fossil fuels and need for better efficiency of the energy conversion systems is imminent, mathematical programming algorithms were applied for the simulation and optimization of a detailed model of an existing lignite-fired power plant in Kozani, Greece (KARDIA IV). The optimization of its overall thermal efficiency, using as control variables the mass flow rates of the steam turbine extractions and the fuel consumption, was performed with the use of the simulation and optimization software gPROMS. The power plant components' mathematical models were imported in software by the authors and the results showed that further increase to the overall thermal efficiency of the plant can be achieved (a 0.55% absolute increase) through reduction of the HP turbine's and increase of the LP turbine's extractions mass flow rates and the parallel reduction of the fuel consumption by 2.05% which also results to an equivalent reduction of the greenhouse gasses. The setup of the mathematical model and the flexibility of gPROMS, make this software applicable to various power plants. - Highlights: ► Modeling and simulation of the flue gases circuit of a specific plant. ► Designing of modules in gPROMS FO (Foreign Objects). ► Simulation of the complete detailed plant with gPROMS. ► Optimization using a non-linear optimization algorithm of the plant's efficiency.

  15. Technology of Inspection and Real-time Displacement Monitoring on Critical Pipe for Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hyun, Jung Seob; Heo, Jae Sil [Korea Electric Power Research Institute, Daejeon (Korea, Republic of); Cho, Sun Young [KLES, Daejeon (Korea, Republic of); Heo, Jeong Yeol; Lee, Seong Kee [Korea South-East Power Co., Seoul (Korea, Republic of)

    2009-10-15

    High temperature steam pipes of thermal power plant are subject to a severe thermal range and usually operates well into the creep range. Cyclic operation of the plant subjects the piping system to mechanical and thermal fatigue damages. Also, poor or malfunctional supports can impose massive loads or stress onto the piping system. In order to prevent the serious damage and failure of the critical piping system, various inspection methods such as visual inspection, computational analysis and on-line piping displacement monitoring were developed. 3-dimensional piping displacement monitoring system was developed with using the aluminum alloy rod and rotary encoder sensors, this system was installed and operated on the high temperature steam piping of 'Y' thermal power plant successfully. It is expected that this study will contribute to the safety of piping system, which could minimize stress and extend the actual life of critical piping.

  16. Utilization of brown coal in FRG power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R.

    1985-07-01

    FRG methods are studied for utilizing brown coal in view of the development of Kansk-Achinsk brown coal deposits. The use of brown coal in FRG power plants has increased from 15% in 1950- 1960 to 85% (total output) in 1982, providing 79.4 TWh of electrical energy. The remainder was used for briquetting, pulverization and breeze coke. In 1982 nearly 100 million tons of brown coal were burned by six large power stations (rated capacity 11,400 MW) to produce nearly 80 billion kWh of energy. Measures are discussed taken to reduce slagging and to remove excessive moisture content. Problems are analyzed associated with increased contamination of the atmosphere in areas with high population density (412/km/sup 2/) and cost of suppression is reviewed. According to available data, the cost of preventive measures taken by FRG, USA, Japan and the Netherlands is equal to 30% of the total cost of the energy. The most critical problem is suppression of sulfur dioxide, either by dry or wet scrubbers or by the addition of dry dolomite or lime to the furnace (75% of all SO/sub 2/ emissions in FRG comes from power stations). A method is described developed by RWE based on a series of distribution headers in the upper part of combustion chambers. At best, 70-80% reduction can be achieved. 14 references.

  17. Application of Paste Backfill in Underground Coal Fires

    Science.gov (United States)

    Masniyom, M.; Drebenstedt, C.

    2009-04-01

    Coal fires are known from different coalfields worldwide. China, India, USA, Australia, Indonesia and South Africa are the main countries affected by coal fires. The fires is thermally intensive and cause numerous sinkholes, large-scale subsidence, air pollution, global warming, loss of mining productivity and increasing safety risk. The Wuda Inner Mongolia coalfield has been selected as a possible test area for paste backfill. The traditional methods, executed by fire fighting teams, by covering the coalfire areas with soil, blasting burning coal outcrops and injecting water in the subsurface fire pockets are continuously improved and extended. Initiatives to introduce modern techniques, such as backfill placement at fracture and borehole, to cool down the burning coal and cut off the air supply. This study is to investigate backfill materials and techniques suited for underground coal fires. Laboratory tests were carried out on physical, chemical and mechanical properties of different backfill materials and mixtures thereof. Special attention was paid to materials generated as by-products and other cheaply available materials e.g. fly ash from power plants. There is a good chance that one of the different material mixtures investigated can be used as a technically and economically viable backfill for underground coal fires.

  18. The economics of coal and nuclear power plants

    International Nuclear Information System (INIS)

    Prior, M.J.

    1978-01-01

    This paper is largely based on a comparison of electrical generating costs from coal-fired power plants and thermal nuclear reactors. Following an introductory section, the subject is considered under the following headings: methodology; cost basis (capital costs, fuel costs, plant factors); generating costs; the fast breeder reactor -general issues; the economics of fast breeder reactors; conclusions and questions. (U.K.)

  19. Analysis of mercury in rock varnish samples in areas impacted by coal-fired power plants

    International Nuclear Information System (INIS)

    Nowinski, Piotr; Hodge, Vernon F.; Gerstenberger, Shawn; Cizdziel, James V.

    2013-01-01

    Rock varnish is a manganese–iron rich coating that forms on rocks, most often in arid climates. To assess its utility as an environmental monitor of mercury contamination, cold vapor atomic absorption spectrometry (CVAAS) was used for analysis. Samples were collected in the fallout patterns of two coal-fired power plants in southern Nevada: the defunct Mohave Power Plant (MPP) and the operating Reid Gardner Power Plant (RGPP). The resultant Hg concentrations in rock varnishes were plotted as a function of the distance from each power plant. The highest concentrations of Hg occurred at locations that suggest the power plants are the main source of pollutants. In addition, past tracer plume studies carried out at MPP show that the highest tracer concentrations coincide with the highest rock varnish Hg concentrations. However, additional samples are required to further demonstrate that power plants are indeed the sources of mercury in varnishes. -- Highlights: •We analyze desert varnish samples collected in the fallout patterns of two coal-fired and analyzed for Hg by CVAA. •The resultant Hg concentrations in the desert varnish samples were plotted as a function of the distance from each power plant. •The highest concentrations of Hg occurred at locations that suggest the power plants are the main source of pollutants. •Data indicate the utility of desert varnish as a passive environmental monitor for Hg atmospheric pollution. -- Cold vapor atomic absorption spectrometry (CVAAS) was used for analysis of mercury in varnished rocks collected in the fallout zones of two coal-fired power plants

  20. Understanding selected trace elements behavior in a coal-fired power plant in Malaysia for assessment of abatement technologies.

    Science.gov (United States)

    Mokhtar, Mutahharah M; Taib, Rozainee M; Hassim, Mimi H

    2014-08-01

    The Proposed New Environmental Quality (Clean Air) Regulation 201X (Draft), which replaces the Malaysia Environmental Quality (Clean Air) 1978, specifies limits to additional pollutants from power generation using fossil fuel. The new pollutants include Hg, HCl, and HF with limits of 0.03, 100, and 15 mg/N-m3 at 6% O2, respectively. These pollutants are normally present in very small concentrations (known as trace elements [TEs]), and hence are often neglected in environmental air quality monitoring in Malaysia. Following the enactment of the new regulation, it is now imperative to understand the TEs behavior and to assess the capability of the existing abatement technologies to comply with the new emission limits. This paper presents the comparison of TEs behavior of the most volatile (Hg, Cl, F) and less volatile (As, Be, Cd, Cr, Ni, Se, Pb) elements in subbituminous and bituminous coal and coal combustion products (CCP) (i.e., fly ash and bottom ash) from separate firing of subbituminous and bituminous coal in a coal-fired power plant in Malaysia. The effect of air pollution control devices configuration in removal of TEs was also investigated to evaluate the effectiveness of abatement technologies used in the plant. This study showed that subbituminous and bituminous coals and their CCPs have different TEs behavior. It is speculated that ash content could be a factor for such diverse behavior In addition, the type of coal and the concentrations of TEs in feed coal were to some extent influenced by the emission of TEs in flue gas. The electrostatic precipitator (ESP) and seawater flue gas desulfurization (FGD) used in the studied coal-fired power plant were found effective in removing TEs in particulate and vapor form, respectively, as well as complying with the new specified emission limits. Implications: Coals used by power plants in Peninsular Malaysia come from the same supplier (Tenaga Nasional Berhad Fuel Services), which is a subsidiary of the Malaysia

  1. Nighttime NOx Chemistry in Coal-Fired Power Plant Plumes

    Science.gov (United States)

    Fibiger, D. L.; McDuffie, E. E.; Dube, W. P.; Veres, P. R.; Lopez-Hilfiker, F.; Lee, B. H.; Green, J. R.; Fiddler, M. N.; Ebben, C. J.; Sparks, T.; Weinheimer, A. J.; Montzka, D.; Campos, T. L.; Cohen, R. C.; Bililign, S.; Holloway, J. S.; Thornton, J. A.; Brown, S. S.

    2015-12-01

    Nitrogen oxides (NOx = NO + NO2) play a key role in atmospheric chemistry. During the day, they catalyze ozone (O3) production, while at night they can react to form nitric acid (HNO3) and nitryl chloride (ClNO2) and remove O3 from the atmosphere. These processes are well studied in the summer, but winter measurements are more limited. Coal-fired power plants are a major source of NOx to the atmosphere, making up approximately 30% of emissions in the US (epa.gov). NOx emissions can vary seasonally, as well as plant-to-plant, with important impacts on the details of the plume chemistry. In particular, due to inefficient plume dispersion, nighttime NOx emissions from power plants are held in concentrated plumes, where rates of mixing with ambient O3 have a strong influence on plume evolution. We will show results from the aircraft-based WINTER campaign over the northeastern United States, where several nighttime intercepts of power plant plumes were made. Several of these intercepts show complete O3 titration, which can have a large influence on NOx lifetime, and thus O3 production, in the plume. When power plant NO emissions exceed background O3 levels, O3 is completely consumed converting NO to NO2. In the presence of O3, NO2 will be oxidized to NO3, which will then react with NO2 to form N2O5, which can then form HNO3 and/or ClNO2 and, ultimately, remove NOx from the atmosphere or provide next-day oxidant sources. If there is no O3 present, however, no further chemistry can occur and NO and NO2 will be transported until mixing with sufficient O3 for higher oxidation products. Modeling results of plume development and mixing, which can tell us more about this transport, will also be presented.

  2. Coal-fired Power Plants with Flexible Amine-based CCS and Co-located Wind Power: Environmental, Economic and Reliability Outcomes

    Science.gov (United States)

    Bandyopadhyay, Rubenka

    Carbon Capture and Storage (CCS) technologies provide a means to significantly reduce carbon emissions from the existing fleet of fossil-fired plants, and hence can facilitate a gradual transition from conventional to more sustainable sources of electric power. This is especially relevant for coal plants that have a CO2 emission rate that is roughly two times higher than that of natural gas plants. Of the different kinds of CCS technology available, post-combustion amine based CCS is the best developed and hence more suitable for retrofitting an existing coal plant. The high costs from operating CCS could be reduced by enabling flexible operation through amine storage or allowing partial capture of CO2 during high electricity prices. This flexibility is also found to improve the power plant's ramp capability, enabling it to offset the intermittency of renewable power sources. This thesis proposes a solution to problems associated with two promising technologies for decarbonizing the electric power system: the high costs of the energy penalty of CCS, and the intermittency and non-dispatchability of wind power. It explores the economic and technical feasibility of a hybrid system consisting of a coal plant retrofitted with a post-combustion-amine based CCS system equipped with the option to perform partial capture or amine storage, and a co-located wind farm. A techno-economic assessment of the performance of the hybrid system is carried out both from the perspective of the stakeholders (utility owners, investors, etc.) as well as that of the power system operator. (Abstract shortened by ProQuest.).

  3. Southeast Asia - air pollution control and coal-fired power generation

    Energy Technology Data Exchange (ETDEWEB)

    Soud, H.N.

    1997-12-01

    Coal-fired power generation in Southeast Asia continues to grow in order to satisfy the increasing demand for electricity throughout the region. Emissions standards have been adopted in some Southeast Asian countries. Particulate matter, SO{sub 2} and NO{sub x} emissions are the main air pollutants for which standards have been introduced. Coal cleaning, and upgrading are not used much currently. Blending is used in Thailand and is being investigated in Indonesia. Pulverised coal combustion continues to dominate the coal-fired generating capacity. FBC is used at smaller scale and in a few cases. PFBC and IGCC are considered only as options for the future. Control priority is given to particulate matter and ESPs are installed on most (existing and new) coal-fired plants. Although FGD has been installed at Mae Moh in Thailand and is planned for Paiton in Indonesia and Sual in the Philippines, the technology is still considered expensive and its application is likely to remain limited. Boiler optimisation is the main NO{sub x} abatement method currently used. It is expected that low NO{sub x} burners will be used in the future especially in new plant. 166 refs., 1 fig., 40 tabs.

  4. Stochastic maintenance optimization at Candu power plants

    International Nuclear Information System (INIS)

    Doyle, E.K.; Duchesne, T.; Lee, C.G.; Cho, D.I.

    2004-01-01

    The use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems as previously reported at ICONE 6 in New Orleans (1996). Further refinement of the station maintenance strategy was evaluated via the applicability of statistical analysis of historical failure data. The viability of stochastic methods in Candu maintenance was illustrated at ICONE 10 in Washington DC (2002). The next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principal impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. The current reality of global competition necessitates the pursuit of all financial optimizers. The next construction phase in the power generation industry will soon begin on a worldwide basis. With the relatively high initial capital cost of new nuclear generation all possible avenues of financial optimization must be evaluated and implemented. (authors)

  5. Effect of Strain Rate on Joint Strength and Failure Mode of Lead-Free Solder Joints

    Science.gov (United States)

    Lin, Jian; Lei, Yongping; Fu, Hanguang; Guo, Fu

    2018-03-01

    In surface mount technology, the Sn-3.0Ag-0.5Cu solder joint has a shorter impact lifetime than a traditional lead-tin solder joint. In order to improve the impact property of SnAgCu lead-free solder joints and identify the effect of silver content on tensile strength and impact property, impact experiments were conducted at various strain rates on three selected SnAgCu based solder joints. It was found that joint failure mainly occurred in the solder material with large plastic deformation under low strain rate, while joint failure occurred at the brittle intermetallic compound layer without any plastic deformation at a high strain rate. Joint strength increased with the silver content in SnAgCu alloys in static tensile tests, while the impact property of the solder joint decreased with increasing silver content. When the strain rate was low, plastic deformation occurred with failure and the tensile strength of the Sn-3.0Ag-0.5Cu solder joint was higher than that of Sn-0.3Ag-0.7Cu; when the strain rate was high, joint failure mainly occurred at the brittle interface layer and the Sn-0.3Ag-0.7Cu solder joint had a better impact resistance with a thinner intermetallic compound layer.

  6. Reliability of diesel generators in the Finnish and Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Pulkkinen, U.; Huovinen, T.; Norros, L.; Vanhala, J.

    1989-10-01

    Diesel generators are used as emergency AC-power sources in nuclear power plants and they produce electric power for other emergency systems during accidents in which offsite power is lost. The reliability of diesel generators is thus of major concern for overall safety of nuclear power plants. In this study we consider the reliability of diesel generators in the Swedish and Finnish nuclear power plants on the basis of collected operational experience. We classify the occurred failures according to their functional criticality, type and cause. The failures caused by human errors in maintenance and testing are analysed in detail. We analyse also the reliability of the diesel generator subsystems. Further, we study the effect of surveillance test and the type of test on the reliability. Finally we construct an unavailability model for single diesel generator unit and discuss the findings of the study giving some practical recommendations

  7. Mercury emission and speciation of coal-fired power plants in China

    Science.gov (United States)

    Wang, S. X.; Zhang, L.; Li, G. H.; Wu, Y.; Hao, J. M.; Pirrone, N.; Sprovieri, F.; Ancora, M. P.

    2010-02-01

    Comprehensive field measurements are needed to understand the mercury emissions from Chinese power plants and to improve the accuracy of emission inventories. Characterization of mercury emissions and their behavior were measured in six typical coal-fired power plants in China. During the tests, the flue gas was sampled simultaneously at inlet and outlet of Selective Catalytic Reduction (SCR), electrostatic precipitators (ESP), and flue gas desulfurization (FGD) using the Ontario Hydro Method (OHM). The pulverized coal, bottom ash, fly ash and gypsum were also sampled in the field. Mercury concentrations in coal burned in the measured power plants ranged from 17 to 385 μg/kg. The mercury mass balances for the six power plants varied from 87 to 116% of the input coal mercury for the whole system. The total mercury concentrations in the flue gas from boilers were at the range of 1.92-27.15 μg/m3, which were significantly related to the mercury contents in burned coal. The mercury speciation in flue gas right after the boiler is influenced by the contents of halogen, mercury, and ash in the burned coal. The average mercury removal efficiencies of ESP, ESP plus wet FGD, and ESP plus dry FGD-FF systems were 24%, 73% and 66%, respectively, which were similar to the average removal efficiencies of pollution control device systems in other countries such as US, Japan and South Korea. The SCR system oxidized 16% elemental mercury and reduced about 32% of total mercury. Elemental mercury, accounting for 66-94% of total mercury, was the dominant species emitted to the atmosphere. The mercury emission factor was also calculated for each power plant.

  8. Evaluation of therapy for dilated cardiomyopathy with heart failure by iodine-123 metaiodobenzyl-guanidine imaging. Comparison with heart rate variability power spectral analysis

    Energy Technology Data Exchange (ETDEWEB)

    Li, Shou-lin; Ikeda, Jun; Takita, Tamotsu; Sekiguchi, Yohei; Demachi, Jun; Chikama, Hisao; Goto, Atsushi; Shirato, Kunio [Tohoku Univ., Sendai (Japan). School of Medicine

    1998-11-01

    The relationship between the myocardial uptake of iodine-123 metaiodobenzylguanidine ({sup 123}I-MIBG) and heart rate variability parameters has not been determined. This study determined the relationship between the change in myocardial uptake of {sup 123}I-MIBG and improvement in left ventricular function after treatment, to determine the usefulness of {sup 123}I-MIBG imaging to assess the effect of therapy on heart failure due to dilated cardiomyopathy (DCM). {sup 123}I-MIBG imaging and power spectral analysis of heart rate variability were performed before and after treatment in 17 patients with heart failure due to DCM. The following parameters were compared before and after treatment: New York Heart Association (NYHA) functional class, radiographic cardiothoracic ratio (CTR), blood pressure, echocardiographic data (left ventricular end-systolic (LVDs) and end-diastolic (LVDd) diameters, left ventricular ejection fraction (LVEF)), plasma concentrations of norepinephrine and epinephrine, heart rate variability power spectral analysis data (mean low frequency (MLF) and high frequency power (MHF)) and the myocardium to mediastinum activity ratio (MYO/M) obtained in early and late images, and washout rate calculated by anterior planar imaging of {sup 123}I-MIBG. The NYHA functional class, LVEF, LVDs, CTR, MLF and MHF improved after treatment. Early MYO/M and late MYO/M improved after treatment. The rate of increase in late MYO/M was positively correlated with the rate of improvement of LVEF after treatment. Furthermore, the late MYO/M was negatively correlated with MLF. Washout rate revealed no correlation with hemodynamic parameters. These findings suggest that late MYO/M is more useful than washout rate to assess the effect of treatment on heart failure due to DCM. Furthermore, the {sup 123}I-MIBG imaging and heart rate variability parameters are useful to assess the autonomic tone in DCM with heart failure. (author)

  9. Evaluation of therapy for dilated cardiomyopathy with heart failure by iodine-123 metaiodobenzyl-guanidine imaging. Comparison with heart rate variability power spectral analysis

    International Nuclear Information System (INIS)

    Li, Shou-lin; Ikeda, Jun; Takita, Tamotsu; Sekiguchi, Yohei; Demachi, Jun; Chikama, Hisao; Goto, Atsushi; Shirato, Kunio

    1998-01-01

    The relationship between the myocardial uptake of iodine-123 metaiodobenzylguanidine ( 123 I-MIBG) and heart rate variability parameters has not been determined. This study determined the relationship between the change in myocardial uptake of 123 I-MIBG and improvement in left ventricular function after treatment, to determine the usefulness of 123 I-MIBG imaging to assess the effect of therapy on heart failure due to dilated cardiomyopathy (DCM). 123 I-MIBG imaging and power spectral analysis of heart rate variability were performed before and after treatment in 17 patients with heart failure due to DCM. The following parameters were compared before and after treatment: New York Heart Association (NYHA) functional class, radiographic cardiothoracic ratio (CTR), blood pressure, echocardiographic data (left ventricular end-systolic (LVDs) and end-diastolic (LVDd) diameters, left ventricular ejection fraction (LVEF)), plasma concentrations of norepinephrine and epinephrine, heart rate variability power spectral analysis data (mean low frequency (MLF) and high frequency power (MHF)) and the myocardium to mediastinum activity ratio (MYO/M) obtained in early and late images, and washout rate calculated by anterior planar imaging of 123 I-MIBG. The NYHA functional class, LVEF, LVDs, CTR, MLF and MHF improved after treatment. Early MYO/M and late MYO/M improved after treatment. The rate of increase in late MYO/M was positively correlated with the rate of improvement of LVEF after treatment. Furthermore, the late MYO/M was negatively correlated with MLF. Washout rate revealed no correlation with hemodynamic parameters. These findings suggest that late MYO/M is more useful than washout rate to assess the effect of treatment on heart failure due to DCM. Furthermore, the 123 I-MIBG imaging and heart rate variability parameters are useful to assess the autonomic tone in DCM with heart failure. (author)

  10. Isolation and selection of microalgae from coal fired thermoelectric power plant for biofixation of carbon dioxide

    Energy Technology Data Exchange (ETDEWEB)

    de Morais, M.G.; Costa, J.A.V. [Federal University of Rio Grande, Rio Grande (Brazil)

    2007-07-15

    Global warming is thought to be caused mainly by the emission of carbon dioxide (CO{sub 2}), with thermoelectric power plants being responsible for about 7% of global CO{sub 2} emissions. Microalgae can reduce CO{sub 2} emissions from thermoelectric power plants, but for this use, they must be resistant to the mixture of gases produced by the power plants. We isolated the microalgae Scenedesmus obliquus and Chlorella kessleri from the waste treatment ponds of the Presidente Medici coal fired thermoelectric power plant in the Southernmost Brazilian state of Rio Grande do Sul and investigated their growth characteristics when exposed to different concentrations of CO{sub 2}. When cultivated with 6% and 12% CO{sub 2}, C. kessleri showed a high maximum specific growth rate ({lambda}{sub max}) of 0.267/day, with a maximum biomass productivity (P-max) of 0.087 g/L/day at 6% CO{sub 2}. For S. obliquus, the highest maximum dry weight biomass value was 1.14 g/L with 12% CO{sub 2}. We also found that these two microalgae also grew well when the culture medium contained up to 18% CO{sub 2}, indicating that they have potential for biofixation of CO{sub 2} in thermoelectric power plants.

  11. Isolation and selection of microalgae from coal fired thermoelectric power plant for biofixation of carbon dioxide

    Energy Technology Data Exchange (ETDEWEB)

    Morais, Michele Greque de [Department of Chemistry, Laboratory of Biochemistry Engineering, Federal University Foundation of Rio Grande, Rio Grande, RS (Brazil); Costa, Jorge Alberto Vieira [Department of Chemistry, Laboratory of Biochemistry Engineering, Federal University Foundation of Rio Grande, Rio Grande, RS (Brazil)]. E-mail: dqmjorge@furg.br

    2007-07-15

    Global warming is thought to be caused mainly by the emission of carbon dioxide (CO{sub 2}), with thermoelectric power plants being responsible for about 7% of global CO{sub 2} emissions. Microalgae can reduce CO{sub 2} emissions from thermoelectric power plants, but for this use, they must be resistant to the mixture of gases produced by the power plants. We isolated the microalgae Scenedesmus obliquus and Chlorella kessleri from the waste treatment ponds of the Presidente Medici coal fired thermoelectric power plant in the Southernmost Brazilian state of Rio Grande do Sul and investigated their growth characteristics when exposed to different concentrations of CO{sub 2}. When cultivated with 6% and 12% CO{sub 2}, C. kessleri showed a high maximum specific growth rate ({mu} {sub max}) of 0.267/day, with a maximum biomass productivity (P {sub max}) of 0.087 g/L/day at 6% CO{sub 2}. For S. obliquus, the highest maximum dry weight biomass value was 1.14 g/L with 12% CO{sub 2}. We also found that these two microalgae also grew well when the culture medium contained up to 18% CO{sub 2}, indicating that they have potential for biofixation of CO{sub 2} in thermoelectric power plants.

  12. Statistical evaluation of failures and repairs of the V-1 measuring and control system

    International Nuclear Information System (INIS)

    Laurinec, R.; Korec, J.; Mitosinka, J.; Zarnovican, V.

    1984-01-01

    A failure record card system was introduced for evaluating the reliability of the measurement and control equipment of the V-1 nuclear power plant. The SPU-800 microcomputer system is used for recording data on magnetic tape and their transmission to the central data processing department. The data are used for evaluating the reliability of components and circuits and a selection is made of the most failure-prone components, and the causes of failures are evaluated as are failure identification, repair and causes of outages. The system provides monthly, annual and total assessment data since the system was commissioned. The results of the statistical evaluation of failures are used for planning preventive maintenance and for determining optimal repair intervals. (E.S.)

  13. Application of data mining in a maintenance system for failure prediction

    OpenAIRE

    Bastos, Pedro; Lopes, Isabel; Pires, L.C.M.

    2014-01-01

    In industrial environment, data generated during equipment maintenance and monitoring activities has become increasingly overwhelming. Data mining presents an opportunity to increase significantly the rate at which the volume of data can be turned into useful information. This paper presents an architecture designed to gather data generated in industrial units on their maintenance activities, and to forecast future failures based on data analysis. Rapid Miner is used to apply diff...

  14. Spatial distribution of mercury and other trace elements in recent lake sediments from central Alberta, Canada: An assessment of the regional impact of coal-fired power plants

    International Nuclear Information System (INIS)

    Sanei, H.; Goodarzi, F.; Outridge, P.M.

    2010-01-01

    These have been growing concerns over the environmental impacts of the coal-fired power plants in the western Canadian province of Alberta, which collectively comprise one of the largest point sources of Hg and other trace elements nationally. The overall cumulative impact of the power plants since the beginning of their activities several decades ago has been a critical question for industry, government agencies, and the research community. This paper aims to delineate the cumulative geographic extent of impact by investigating the spatial distribution of mercury and other trace elements of environmental concern in nine freshwater lakes, which cover the large area surrounding the coal-fired power plants in central Alberta, Canada. 210-Lead dating was used in conjunction with physical evidence of deposited fly ash to determine the sediments' age and hence the depths corresponding to the onset of coal-fired power generation in 1956. Total mean concentrations and fluxes of elements of environmental concern with integrated values since 1956 were then determined. The concentration values do not reflect the catastrophic oil spill at Lake Wabamun in 2005. The post-1956 flux rates of As, Cd, Co, Cr, Cu, Hg, Mo, Ni, Pb, Sb, V, W, and Zn were generally highest in sediment cores obtained from two lakes adjacent to power plants. However, the variable prevailing wind directions played an important role in determining the aerial distribution of Hg and other trace elements to the southeast and to the west of the power plants. Post-1956 fluxes of most elements declined downwind (westward), consistent with strong easterly winds transporting metal pollution further to the west of the power plants. However, spatial interpolation of the data suggested a major southern extension to the area of maximum metal deposition, which has not been sampled by this or previous studies in the region. An atmospheric model estimate of total Hg flux in 2007 near the Genesee power plant was

  15. Near-term implications of a ban on new coal-fired power plants in the United States.

    Science.gov (United States)

    Newcomer, Adam; Apt, Jay

    2009-06-01

    Large numbers of proposed new coal power generators in the United States have been canceled, and some states have prohibited new coal power generators. We examine the effects on the U.S. electric power system of banning the construction of coal-fired electricity generators, which has been proposed as a means to reduce U.S. CO2 emissions. The model simulates load growth, resource planning, and economic dispatch of the Midwest Independent Transmission System Operator (ISO), Inc., Electric Reliability Council of Texas (ERCOT), and PJM under a ban on new coal generation and uses an economic dispatch model to calculate the resulting changes in dispatch order, CO2 emissions, and fuel use under three near-term (until 2030) future electric power sector scenarios. A national ban on new coal-fired power plants does not lead to CO2 reductions of the scale required under proposed federal legislation such as Lieberman-Warner but would greatly increase the fraction of time when natural gas sets the price of electricity, even with aggressive wind and demand response policies.

  16. Failure mode analysis using state variables derived from fault trees with application

    International Nuclear Information System (INIS)

    Bartholomew, R.J.

    1982-01-01

    Fault Tree Analysis (FTA) is used extensively to assess both the qualitative and quantitative reliability of engineered nuclear power systems employing many subsystems and components. FTA is very useful, but the method is limited by its inability to account for failure mode rate-of-change interdependencies (coupling) of statistically independent failure modes. The state variable approach (using FTA-derived failure modes as states) overcomes these difficulties and is applied to the determination of the lifetime distribution function for a heat pipe-thermoelectric nuclear power subsystem. Analyses are made using both Monte Carlo and deterministic methods and compared with a Markov model of the same subsystem

  17. Broadening failure rate distributions in PRA uncertainty analyses

    International Nuclear Information System (INIS)

    Martz, H.F.

    1984-01-01

    Several recent nuclear power plant probabilistic risk assessments (PRAs) have utilized broadened Reactor Safety Study (RSS) component failure rate population variability curves to compensate for such things as expert overvaluation bias in the estimates upon which the curves are based. A simple two-components of variation empirical Bayes model is proposed for use in estimating the between-expert variability curve in the presence of such biases. Under certain conditions this curve is a population variability curve. Comparisons are made with the existing method. The popular procedure appears to be generally much more conservative than the empirical Bayes method in removing such biases. In one case the broadened curve based on the popular method is more than two orders of magnitude broader than the empirical Bayes curve. In another case it is found that the maximum justifiable degree of broadening of the RSS curve is to increase α from 5% to 12%, which is significantly less than 20% value recommended in the popular approach. 15 references, 1 figure, 5 tables

  18. Evaluation and comparison of estimation methods for failure rates and probabilities

    Energy Technology Data Exchange (ETDEWEB)

    Vaurio, Jussi K. [Fortum Power and Heat Oy, P.O. Box 23, 07901 Loviisa (Finland)]. E-mail: jussi.vaurio@fortum.com; Jaenkaelae, Kalle E. [Fortum Nuclear Services, P.O. Box 10, 00048 Fortum (Finland)

    2006-02-01

    An updated parametric robust empirical Bayes (PREB) estimation methodology is presented as an alternative to several two-stage Bayesian methods used to assimilate failure data from multiple units or plants. PREB is based on prior-moment matching and avoids multi-dimensional numerical integrations. The PREB method is presented for failure-truncated and time-truncated data. Erlangian and Poisson likelihoods with gamma prior are used for failure rate estimation, and Binomial data with beta prior are used for failure probability per demand estimation. Combined models and assessment uncertainties are accounted for. One objective is to compare several methods with numerical examples and show that PREB works as well if not better than the alternative more complex methods, especially in demanding problems of small samples, identical data and zero failures. False claims and misconceptions are straightened out, and practical applications in risk studies are presented.

  19. Mechanism and kinetics of uranium adsorption onto soil around coal-fired power plant

    Science.gov (United States)

    Yasim, Nurzulaifa Shaheera Erne Mohd; Ariffin, Nik Azlin Nik; Mohammed, Noradila; Ayob, Syafina

    2017-11-01

    Coal is the largest source of energy in Malaysia providing approximately 80 % of all entire power needs. The combustion of coal concentrates a high content of heavy metals and radioactive elements in the ashes and sludge. Hazardous emissions from coal combustion were deposited into the soil and most likely transported into the groundwater system. The presence of radioactive materials in the ground water system can cause a wide range of environmental impacts and adverse health effects like cancer, impairment of neurological function and cardiovascular disease. However, the soil has a natural capability in adsorption of radioactive materials. Thus, this study was evaluated the adsorption capacity of Uranium onto the soil samples collected nearby the coal-fired power plants. In the batch experiment, parameters that were set constant include pH, the amount of soil and contact time. Various initial concentrations of radionuclides elements in the range of 2 mg/L - 10 mg/L were used. The equilibrium adsorption data was analyzed by the Freundlich isotherm and Langmuir isotherms. Then, the influences of solution pH, contact time and temperature on the adsorption process were investigated. The kinetics of radioactive materials was discussed by pseudo-first-order and pseudo-second-order rate equation. Thus, the data from this study could provide information about the potentiality of soil in sorption of radioactive materials that can be leached into groundwater. Besides that, this study could also be used as baseline data for future reference in the development of adsorption modeling in the calculation of distribution coefficient.

  20. The coal fired power plant of Vado Ligure

    International Nuclear Information System (INIS)

    Ferrara, V.

    1987-01-01

    The problem of radiological impact from radioactive effluents released by the forecast new coal-fired power plant of Vado Ligure, is examinated. Using health physic metodologies of evaluation, the highest levels of dose equivalents to the population are computed. Taken into account the possible errors due to conservative models adopted, it is concluded that the induced radiological risks are to be considered negligible, both referring to the actual natural radiological levels in the environment, and considering the maximum permissible levels stated in international raccomandations

  1. Investigations of the Failure in Boilers Economizer Tubes Used in Power Plants

    Science.gov (United States)

    Moakhar, Roozbeh Siavash; Mehdipour, Mehrad; Ghorbani, Mohammad; Mohebali, Milad; Koohbor, Behrad

    2013-09-01

    In this study, failure of a high pressure economizer tube of a boiler used in gas-Mazut combined cycle power plants was studied. Failure analysis of the tube was accomplished by taking into account visual inspection, thickness measurement, and hardness testing as well as microstructural observations using scanning electron microscopy (SEM), energy dispersive spectroscopy (EDS), and x-ray diffraction (XRD). Optical microscopy images indicate that there is no phase transformation during service, and ferrite-pearlite remained. The results of XRD also revealed Iron sulfate (FeSO4) and Iron hydroxide sulfate (FeOH(SO4)) phases formed on the steel surface. A considerable amount of Sulfur was also detected on the outer surface of the tube by EDS analysis. Dew-point corrosion was found to be the principal reason for the failure of the examined tube while it has been left out-of-service.

  2. Reducing unidentified MOV failures: An innovative approach to thermal overload monitoring

    International Nuclear Information System (INIS)

    Hill, K.; Watson, M.E.; Ali, H.S.; Schlesinger, R.

    1991-01-01

    Historically the failure of motor-operated valves to actuate on demand has caused plant transients, reduced safety system reliability, and lost plant availability. The typical control and indication circuit design uses thermal overload contacts in the control circuit only. This has been recognized as a significant unidentified valve failure mode that may prevent the valve from performing its safety function when required. Different approaches have been evaluated to alert operations personnel to this thermal overload condition, but no cost-effective solution has provided indication of the thermal overload while maintaining valve position indication. Iowa Electric Light and Power Company's Duane Arnold Energy Center (DAEC) is utilizing a nuclear-qualified thermal overload monitor in valve control and indication circuits. This innovative approach has proven economical as no new cabling or indicating devices are required. Indication is provided using existing valve position indicating lights. The monitor is engineered to provide indication of a thermal overload trip as well as continuous indication of valve position, consistent with Regulatory Guide 1.97 and guidance provided by Generic Letter 89-10

  3. On-site electric power source facility for Japanese nuclear power plant

    International Nuclear Information System (INIS)

    Oohara, T.

    1986-01-01

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  4. On-site electric power source facility for Japanese nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Oohara, T. [Incident/Failure Analysis and Evaluation Office, Nuclear Power Safety Information Research Centre, Nuclear Power Engineering Test Centre, 2nd Floor, Shuwa-Kamiyacho Bldg., 3-13, 4-Chome, Toranomon Minato-ku, Tokyo 105 (Japan)

    1986-02-15

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  5. Fireside corrosion of nickel base alloys in future 700 C coal fired power plants; Rauchgasseitige Korrosion von Nickelbasislegierungen fuer zukuenftige 700 C-Dampfkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Luettschwager, Frank

    2011-09-27

    Coal is still the most important energy source in Germany. In 2009 it produced 42.9 % of the overall German electrical power. Coal is available world-wide in large quantities and can be delivered economically. One of the possible ways to reduce CO{sub 2} pollution is the increase of efficiency of coal fired power plants, which requires steam conditions of up to 700 C - 730 C and 350 bar. Because many German power units will reach the end of their technical lifespan in a few years or the following decade, one will have the possibility to build up modern types of power plants with increased efficiency of more than 50 %. Some international standards (European Pressure Equipment Directive or ASME Boiler and Pressure Vessel Code) require 100 000 hour creep rupture strength of 100 MPa at 750 C. Therefore, nickel base alloys are in the focus of material qualification processes. Nickel base alloys are well investigated due to their hot corrosion behaviour. It is known that sodium sulphate may generate hot corrosion on those alloys at temperatures above its melting point of 884 C. On nickel base alloys an eutectic mixture of nickel sulphate and sodium sulphate with a melting point of 671 C can be generated, which leads to accelerated corrosion. This work examines, whether the high amount of sulphur and alkali metals will induce hot corrosion at the estimated working temperature on devices manufactured from nickel base alloy. Two synthetic coal ash deposits, according to the chemical composition of hard coal and lignite, and typical flue gases with and without sulphur dioxide were blended of pure agents. The reactions of the deposits with heater tubes' materials and synthetic flue gases are examined in the temperature range from 650 C to 800 C and different time ranges up to 2000 hours. The corroded specimen are examined with SEM/EDX to identify relevant corrosion products and determine the corrosivity of deposited compounds. Deposits increase the corrosion rate of

  6. Variation in aerosol nucleation and growth in coal-fired power plant plumes due to background aerosol, meteorology and emissions: sensitivity analysis and parameterization.

    Science.gov (United States)

    Stevens, R. G.; Lonsdale, C. L.; Brock, C. A.; Reed, M. K.; Crawford, J. H.; Holloway, J. S.; Ryerson, T. B.; Huey, L. G.; Nowak, J. B.; Pierce, J. R.

    2012-04-01

    New-particle formation in the plumes of coal-fired power plants and other anthropogenic sulphur sources may be an important source of particles in the atmosphere. It remains unclear, however, how best to reproduce this formation in global and regional aerosol models with grid-box lengths that are 10s of kilometres and larger. The predictive power of these models is thus limited by the resultant uncertainties in aerosol size distributions. In this presentation, we focus on sub-grid sulphate aerosol processes within coal-fired power plant plumes: the sub-grid oxidation of SO2 with condensation of H2SO4 onto newly-formed and pre-existing particles. Based on the results of the System for Atmospheric Modelling (SAM), a Large-Eddy Simulation/Cloud-Resolving Model (LES/CRM) with online TwO Moment Aerosol Sectional (TOMAS) microphysics, we develop a computationally efficient, but physically based, parameterization that predicts the characteristics of aerosol formed within coal-fired power plant plumes based on parameters commonly available in global and regional-scale models. Given large-scale mean meteorological parameters, emissions from the power plant, mean background condensation sink, and the desired distance from the source, the parameterization will predict the fraction of the emitted SO2 that is oxidized to H2SO4, the fraction of that H2SO4 that forms new particles instead of condensing onto preexisting particles, the median diameter of the newly-formed particles, and the number of newly-formed particles per kilogram SO2 emitted. We perform a sensitivity analysis of these characteristics of the aerosol size distribution to the meteorological parameters, the condensation sink, and the emissions. In general, new-particle formation and growth is greatly reduced during polluted conditions due to the large preexisting aerosol surface area for H2SO4 condensation and particle coagulation. The new-particle formation and growth rates are also a strong function of the

  7. Effect of increased renewables generation on operation of thermal power plants

    International Nuclear Information System (INIS)

    Eser, Patrick; Singh, Antriksh; Chokani, Ndaona; Abhari, Reza S.

    2016-01-01

    Highlights: • Impacts of increased renewables in central European transmission system are assessed. • Individual transmission lines and power plants of transmission system are modelled. • Starts and ramps of thermal power plants significantly increase with increased renewables. • Impact of renewables on thermal power plants is highly dependent on location. - Abstract: High spatial and temporal resolution optimal power flow simulations of the 2013 and 2020 interconnected grid in Central Western and Eastern Europe regions are undertaken to assess the impact of an increased penetration of renewables on thermal power plants. In contrast to prior studies, the present work models each individual transmission line and power plant within the two regions. Furthermore, for conventional plants, electricity costs are determined with respect to fuel type, nameplate capacity, operating condition and geographic location; cycling costs are modeled as function of the recent operational history. For renewable power plants, costs and available power are determined using mesoscale weather simulations and hydrology models. Countrywide validation of the simulations shows that all renewable and most conventional power production is predicted with less than 10% error. It is shown that the increased penetration of renewables in 2020 will induce a 4–23% increase in the number of starts of conventional plants. The number of load ramps significantly increases by 63–181%, which underlines the necessity for equipment manufacturers and utilities to adapt to scenarios of high penetration of renewables. The increased cycling operation of coal plants is shown to depend strongly on the power plant’s location and is mainly observed in Germany and the Czech Republic. Austrian coal plants are cycled less because they supply more base load power to southern Germany, where several nuclear power plants will be phased out by 2020. Thus there is a need for more transmission capacity along

  8. Assessment of 210Po deposition in moss species and soil around coal-fired power plant

    International Nuclear Information System (INIS)

    Nita Salina Abu Bakar; Ahmad Saat

    2013-01-01

    In the present study, the depositions of 210 Po were assessed in the surface soil and some mosses species found in the area around coal fired power plant using radiochemical deposition and alpha spectrometry counting system. The purposes of the study were to determine activity concentrations of 210 Po in mosses and surface soil collected around coal-fired power plant in relation to trace the potential source of 210 Po and to identify most suitable moss species as a bio-indicator for 210 Po deposition. In this study, different species of mosses, Orthodontium imfractum, Campylopus serratus and Leucobryum aduncum were collected in May 2011 at the area around 15 km radius from Tanjung Bin coal-fired power plant located in Pontian, Johor. The 210 Po activity concentrations in mosses and soil varied in the range 102 ± 4 to 174 ± 8 Bq/kg dry wt. and 37 ± 2 to 184 ± 8 Bq/kg dry wt., respectively. Corresponding highest activity concentration of 210 Po observed in L. aduncum, therefore, this finding can be concluded this species was the most suitable as a bio-indicator for 210 Po deposition. On the other hand, it is clear the accumulation of 210 Po in mosses might be supplied from various sources of atmospheric deposition such as coal-fired power plant operation, industrial, plantation, agriculture and fertilizer activities, burned fuel fossil and forest; and other potential sources. Meanwhile, the main source of 210 Po in surface soil is supplied from the in situ deposition of radon decay and its daughters in the soil itself. (author)

  9. Testosterone Deficiency Increases Hospital Readmission and Mortality Rates in Male Patients with Heart Failure

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Marcelo Rodrigues dos; Sayegh, Ana Luiza Carrari; Groehs, Raphaela Vilar Ramalho; Fonseca, Guilherme [Instituto do Coração (InCor) - Faculdade de Medicina da Universidade de São Paulo (Brazil); Trombetta, Ivani Credidio [Instituto do Coração (InCor) - Faculdade de Medicina da Universidade de São Paulo (Brazil); Universidade Nove de Julho (UNINOVE) (Brazil); Barretto, Antônio Carlos Pereira [Instituto do Coração (InCor) - Faculdade de Medicina da Universidade de São Paulo (Brazil); Arap, Marco Antônio [Faculdade de medicina da Universidade de São Paulo - Urologia (Brazil); Negrão, Carlos Eduardo [Instituto do Coração (InCor) - Faculdade de Medicina da Universidade de São Paulo (Brazil); Escola de Educação Física e Esporte da Universidade de São Paulo, São Paulo, SP (Brazil); Middlekauff, Holly R. [Division of Cardiology - David Geffen School of Medicine - University of California (United States); Alves, Maria-Janieire de Nazaré Nunes, E-mail: janieire.alves@incor.usp.br [Instituto do Coração (InCor) - Faculdade de Medicina da Universidade de São Paulo (Brazil)

    2015-09-15

    Testosterone deficiency in patients with heart failure (HF) is associated with decreased exercise capacity and mortality; however, its impact on hospital readmission rate is uncertain. Furthermore, the relationship between testosterone deficiency and sympathetic activation is unknown. We investigated the role of testosterone level on hospital readmission and mortality rates as well as sympathetic nerve activity in patients with HF. Total testosterone (TT) and free testosterone (FT) were measured in 110 hospitalized male patients with a left ventricular ejection fraction < 45% and New York Heart Association classification IV. The patients were placed into low testosterone (LT; n = 66) and normal testosterone (NT; n = 44) groups. Hypogonadism was defined as TT < 300 ng/dL and FT < 131 pmol/L. Muscle sympathetic nerve activity (MSNA) was recorded by microneurography in a subpopulation of 27 patients. Length of hospital stay was longer in the LT group compared to in the NT group (37 ± 4 vs. 25 ± 4 days; p = 0.008). Similarly, the cumulative hazard of readmission within 1 year was greater in the LT group compared to in the NT group (44% vs. 22%, p = 0.001). In the single-predictor analysis, TT (hazard ratio [HR], 2.77; 95% confidence interval [CI], 1.58–4.85; p = 0.02) predicted hospital readmission within 90 days. In addition, TT (HR, 4.65; 95% CI, 2.67–8.10; p = 0.009) and readmission within 90 days (HR, 3.27; 95% CI, 1.23–8.69; p = 0.02) predicted increased mortality. Neurohumoral activation, as estimated by MSNA, was significantly higher in the LT group compared to in the NT group (65 ± 3 vs. 51 ± 4 bursts/100 heart beats; p < 0.001). These results support the concept that LT is an independent risk factor for hospital readmission within 90 days and increased mortality in patients with HF. Furthermore, increased MSNA was observed in patients with LT.

  10. Testosterone Deficiency Increases Hospital Readmission and Mortality Rates in Male Patients with Heart Failure

    International Nuclear Information System (INIS)

    Santos, Marcelo Rodrigues dos; Sayegh, Ana Luiza Carrari; Groehs, Raphaela Vilar Ramalho; Fonseca, Guilherme; Trombetta, Ivani Credidio; Barretto, Antônio Carlos Pereira; Arap, Marco Antônio; Negrão, Carlos Eduardo; Middlekauff, Holly R.; Alves, Maria-Janieire de Nazaré Nunes

    2015-01-01

    Testosterone deficiency in patients with heart failure (HF) is associated with decreased exercise capacity and mortality; however, its impact on hospital readmission rate is uncertain. Furthermore, the relationship between testosterone deficiency and sympathetic activation is unknown. We investigated the role of testosterone level on hospital readmission and mortality rates as well as sympathetic nerve activity in patients with HF. Total testosterone (TT) and free testosterone (FT) were measured in 110 hospitalized male patients with a left ventricular ejection fraction < 45% and New York Heart Association classification IV. The patients were placed into low testosterone (LT; n = 66) and normal testosterone (NT; n = 44) groups. Hypogonadism was defined as TT < 300 ng/dL and FT < 131 pmol/L. Muscle sympathetic nerve activity (MSNA) was recorded by microneurography in a subpopulation of 27 patients. Length of hospital stay was longer in the LT group compared to in the NT group (37 ± 4 vs. 25 ± 4 days; p = 0.008). Similarly, the cumulative hazard of readmission within 1 year was greater in the LT group compared to in the NT group (44% vs. 22%, p = 0.001). In the single-predictor analysis, TT (hazard ratio [HR], 2.77; 95% confidence interval [CI], 1.58–4.85; p = 0.02) predicted hospital readmission within 90 days. In addition, TT (HR, 4.65; 95% CI, 2.67–8.10; p = 0.009) and readmission within 90 days (HR, 3.27; 95% CI, 1.23–8.69; p = 0.02) predicted increased mortality. Neurohumoral activation, as estimated by MSNA, was significantly higher in the LT group compared to in the NT group (65 ± 3 vs. 51 ± 4 bursts/100 heart beats; p < 0.001). These results support the concept that LT is an independent risk factor for hospital readmission within 90 days and increased mortality in patients with HF. Furthermore, increased MSNA was observed in patients with LT

  11. Testosterone Deficiency Increases Hospital Readmission and Mortality Rates in Male Patients with Heart Failure

    Directory of Open Access Journals (Sweden)

    Marcelo Rodrigues dos Santos

    2015-01-01

    Full Text Available Background: Testosterone deficiency in patients with heart failure (HF is associated with decreased exercise capacity and mortality; however, its impact on hospital readmission rate is uncertain. Furthermore, the relationship between testosterone deficiency and sympathetic activation is unknown. Objective: We investigated the role of testosterone level on hospital readmission and mortality rates as well as sympathetic nerve activity in patients with HF. Methods: Total testosterone (TT and free testosterone (FT were measured in 110 hospitalized male patients with a left ventricular ejection fraction < 45% and New York Heart Association classification IV. The patients were placed into low testosterone (LT; n = 66 and normal testosterone (NT; n = 44 groups. Hypogonadism was defined as TT < 300 ng/dL and FT < 131 pmol/L. Muscle sympathetic nerve activity (MSNA was recorded by microneurography in a subpopulation of 27 patients. Results: Length of hospital stay was longer in the LT group compared to in the NT group (37 ± 4 vs. 25 ± 4 days; p = 0.008. Similarly, the cumulative hazard of readmission within 1 year was greater in the LT group compared to in the NT group (44% vs. 22%, p = 0.001. In the single-predictor analysis, TT (hazard ratio [HR], 2.77; 95% confidence interval [CI], 1.58–4.85; p = 0.02 predicted hospital readmission within 90 days. In addition, TT (HR, 4.65; 95% CI, 2.67–8.10; p = 0.009 and readmission within 90 days (HR, 3.27; 95% CI, 1.23–8.69; p = 0.02 predicted increased mortality. Neurohumoral activation, as estimated by MSNA, was significantly higher in the LT group compared to in the NT group (65 ± 3 vs. 51 ± 4 bursts/100 heart beats; p < 0.001. Conclusion: These results support the concept that LT is an independent risk factor for hospital readmission within 90 days and increased mortality in patients with HF. Furthermore, increased MSNA was observed in patients with LT.

  12. Failure rate analysis using GLIMMIX

    International Nuclear Information System (INIS)

    Moore, L.M.; Hemphill, G.M.; Martz, H.F.

    1998-01-01

    This paper illustrates use of a recently developed SAS macro, GLIMMIX, for implementing an analysis suggested by Wolfinger and O'Connell (1993) in modeling failure count data with random as well as fixed factor effects. Interest in this software tool arose from consideration of modernizing the Failure Rate Analysis Code (FRAC), developed at Los Alamos National Laboratory in the early 1980's by Martz, Beckman and McInteer (1982). FRAC is a FORTRAN program developed to analyze Poisson distributed failure count data as a log-linear model, possibly with random as well as fixed effects. These statistical modeling assumptions are a special case of generalized linear mixed models, identified as GLMM in the current statistics literature. In the nearly 15 years since FRAC was developed, there have been considerable advances in computing capability, statistical methodology and available statistical software tools allowing worthwhile consideration of the tasks of modernizing FRAC. In this paper, the approaches to GLMM estimation implemented in GLIMMIX and in FRAC are described and a comparison of results for the two approaches is made with data on catastrophic time-dependent pump failures from a report by Martz and Whiteman (1984). Additionally, statistical and graphical model diagnostics are suggested and illustrated with the GLIMMIX analysis results

  13. Influencing factors of public support for modern coal-fired power plant projects: An empirical study from China

    International Nuclear Information System (INIS)

    Liu, Feng; Lyu, Tao; Pan, Li; Wang, Fei

    2017-01-01

    With the development of clean coal technology, modern coal-fired power plants have achieved the similar emission standards as gas power plants. However, due to the impressions of high pollution and high emission in traditional coal-fired power plants, such projects are often opposed by local residents, which hinder the promotion of this technology. This manuscript aims to investigate public attitudes toward these projects and to analyze the influencing mechanisms of the factors of public support. The conceptual model was built with sense of place, trust and environmental attitude as the independent variables, benefit and cost perceptions as the mediating variables and public support as the dependent variable. The model was tested and modified by structural equation modelling. The results revealed that sense of place had a slight indirect impact (−0.043) on public support through benefit perception, whereas trust had a direct impact (0.332) on public support and indirect impacts (0.298) through benefit and cost perceptions. Environmental attitude had indirect impacts on public support through benefit perception (0.180) and cost perception (−0.115). In addition, policy suggestions on decision-making, project publicity and compensation strategy are proposed to enhance public support for similar projects. - Highlights: • This manuscript aims at eliminating the NIMBY effects on modern coal-fired power plant project. • A SEM model is proposed to explore how potential factors affect public support. • Trust is the dominant influencing factor to improve public support with both direct and indirect impacts. • Environmental attitude can also have positive effect on public support through rational compensation plans.

  14. Soil radioactivity levels and radiation hazard assessment around a Thermal Power Plant

    International Nuclear Information System (INIS)

    Kumar, Mukesh; Kumar, Pankaj; Sharma, Somdutt; Agrawal, Anshu; Kumar, Rajesh; Prajith, Rama; Sahoo, B.K.

    2016-01-01

    Coal based thermal power plants further enhance the level of radioactivity in the environment, as burning of coal produces fly ash that can be released into the environment containing traces of 238 U, 232 Th and their decay products. Therefore, coal fired power plants are one of the major contributor towards the Technologically Enhanced Natural Radiation (TENR). Keeping this in view, a study of natural radioactivity in the soil of twenty five villages within 5 km radius around the Harduaganj Thermal Power Plant, Aligarh, UP, India is going on under a BRNS major project, to know the radiological implications on general population living around this plant

  15. Full-scale ash deposition measurements at Avedøre Power Plant unit 2 during suspension-firing of wood with and without coal ash addition

    DEFF Research Database (Denmark)

    Wu, Hao; Shafique Bashir, Muhammad; Jensen, Peter Arendt

    The formation of deposits during suspension-firing of wood at Avedøre Power Plant unit 2 (AVV2) was studied by using an advanced deposit probe system. The tests were conducted both with and without coal ash addition, and at two different locations with flue gas temperatures of 1250-1300 oC and 750...... with a high flue gas temperature of 1250-1300 oC, although the addition of coal fly ash increased the differential deposit formation rate (DDF-rate) and the ash deposition propensity, the deposit removal frequency were considerably increased and the major shedding mechanism was changed from soot...... corrosion. At the location with a low flue gas temperature of 750-800 oC, the addition of coal fly ash reduced the ash deposition propensity and caused the formed deposits being easily removable. Moreover, the KCl and KOH/K2CO3 found in the low-temperature deposits without coal ash addition disappeared when...

  16. Nuclear power plant fire protection: philosophy and analysis

    International Nuclear Information System (INIS)

    Berry, D.L.

    1980-05-01

    This report combines a fire severity analysis technique with a fault tree methodology for assessing the importance to nuclear power plant safety of certain combinations of components and systems. Characteristics unique to fire, such as propagation induced by the failure of barriers, have been incorporated into the methodology. By applying the resulting fire analysis technique to actual conditions found in a representative nuclear power plant, it is found that some safety and nonsafety areas are both highly vulnerable to fire spread and impotant to overall safety, while other areas prove to be of marginal importance. Suggestions are made for further experimental and analytical work to supplement the fire analysis method

  17. Morbidity and Mortality conference as part of PDCA cycle to decrease anastomotic failure in colorectal surgery.

    Science.gov (United States)

    Vogel, Peter; Vassilev, Georgi; Kruse, Bernd; Cankaya, Yesim

    2011-10-01

    Morbidity and Mortality meetings are an accepted tool for quality management in many hospitals. However, it is not proven whether these meetings increase quality. It was the aim of this study to investigate whether Morbidity and Mortality meetings as part of a PDCA cycle (Plan, Do, Check, Act) can improve the rate of anastomotic failure in colorectal surgery. From January 1, 2004, to December 31, 2009, data for all anastomotic failures in patients operated on for colorectal diseases in the Department of Surgery (Klinikum Friedrichshafen, Germany) were prospectively collected. The events were discussed in Morbidity and Mortality meetings. On the basis of these discussions, a strategy to prevent anastomotic leaks and a new target were defined (i.e. 'Plan'). This strategy was implemented in the following period (i.e. 'Do') and results were prospectively analysed. A new strategy was established when the results differed from the target, and a new standard was defined when the target was achieved (i.e. 'Check, Act'). The year 2004 was set as the base year. In 2005 and 2006, new strategies were established. Comparing this period with the period of strategy conversion (2007-2009), we found a significant decrease in the anastomotic failure rate in colorectal surgery patients (5.7% vs 2.8%; p = 0.05), whereas the risk factors for anastomotic failure were unchanged or unfavourable. If Morbidity and Mortality meetings are integrated in a PDCA cycle, they can decrease anastomotic failure rates and improve quality of care in colorectal surgery. Therefore, the management tool 'PDCA cycle' should be considered also for medical issues.

  18. Mercury emission and speciation of coal-fired power plants in China

    Directory of Open Access Journals (Sweden)

    S. X. Wang

    2010-02-01

    Full Text Available Comprehensive field measurements are needed to understand the mercury emissions from Chinese power plants and to improve the accuracy of emission inventories. Characterization of mercury emissions and their behavior were measured in six typical coal-fired power plants in China. During the tests, the flue gas was sampled simultaneously at inlet and outlet of Selective Catalytic Reduction (SCR, electrostatic precipitators (ESP, and flue gas desulfurization (FGD using the Ontario Hydro Method (OHM. The pulverized coal, bottom ash, fly ash and gypsum were also sampled in the field. Mercury concentrations in coal burned in the measured power plants ranged from 17 to 385 μg/kg. The mercury mass balances for the six power plants varied from 87 to 116% of the input coal mercury for the whole system. The total mercury concentrations in the flue gas from boilers were at the range of 1.92–27.15 μg/m3, which were significantly related to the mercury contents in burned coal. The mercury speciation in flue gas right after the boiler is influenced by the contents of halogen, mercury, and ash in the burned coal. The average mercury removal efficiencies of ESP, ESP plus wet FGD, and ESP plus dry FGD-FF systems were 24%, 73% and 66%, respectively, which were similar to the average removal efficiencies of pollution control device systems in other countries such as US, Japan and South Korea. The SCR system oxidized 16% elemental mercury and reduced about 32% of total mercury. Elemental mercury, accounting for 66–94% of total mercury, was the dominant species emitted to the atmosphere. The mercury emission factor was also calculated for each power plant.

  19. Trend analysis of explosion events at overseas nuclear power plants

    International Nuclear Information System (INIS)

    Shimada, Hiroki

    2008-01-01

    We surveyed failures caused by disasters (e.g., severe storms, heavy rainfall, earthquakes, explosions and fires) which occurred during the 13 years from 1995 to 2007 at overseas nuclear power plants (NPPs) from the nuclear information database of the Institute of Nuclear Safety System. Incorporated (INSS). The results revealed that explosions were the second most frequent type of failure after fires. We conducted a trend analysis on such explosion events. The analysis by equipment, cause, and effect on the plant showed that the explosions occurred mainly at electrical facilities, and thus it is essential to manage the maintenance of electrical facilities for preventing explosions. In addition, it was shown that explosions at transformers and batteries, which have never occurred at Japan's NPPs, accounted for as much as 55% of all explosions. The fact infers that this difference is attributable to the difference in maintenance methods of transformers (condition based maintenance adopted by NPPs) and workforce organization of batteries (inspections performed by utilities' own maintenance workers at NPPs). (author)

  20. Prevention of condenser tubes corroson from polluted sea wtaer at Saijo thermal power station. Saijo hatsudensho ni okeru fukusuiki kan no boshoku taisaku

    Energy Technology Data Exchange (ETDEWEB)

    Okada, T.; Sato, N.; Ito, M. (Shikoku Electric Power Co. Inc., Kagawa (Japan))

    1991-03-15

    After the oil shock, Saijou thermal power station converted its energy source into coal to diversify the power source. With rising operation rate at the plant after fuel conversion, leaky condenser tubes have increased. Such leakage concentrated especially in new 70/30 cupro-nickel tubes equipped in air cooling zones of the condenser. This report investigates the cause of this leakage and describes the study results on the corrosion prevention. Consequently, following two measures were taken: a measure to prevent local erosion of aluminum brass pipes by means of preventing inflow of foreign materials such as seashells; a measure to prevent corrosion of 70/30 cupro-nickel sulfide by strengthening the injection of ferrous sulfate and by test loading of coated tubes. As a result, no sea water was leaked. Moreover, it was found through the eddy current examination that sulfide corrosion of the new 70/30 cupro-nickel tubes was reduced by iron coat and the rate of losing its thickness decreased remarkably. 1 ref., 15 figs., 5 tabs.

  1. Review of the coal-fired, over-supercritical and ultra-supercritical steam power plants

    Science.gov (United States)

    Tumanovskii, A. G.; Shvarts, A. L.; Somova, E. V.; Verbovetskii, E. Kh.; Avrutskii, G. D.; Ermakova, S. V.; Kalugin, R. N.; Lazarev, M. V.

    2017-02-01

    The article presents a review of developments of modern high-capacity coal-fired over-supercritical (OSC) and ultra-supercritical (USC) steam power plants and their implementation. The basic engineering solutions are reported that ensure the reliability, economic performance, and low atmospheric pollution levels. The net efficiency of the power plants is increased by optimizing the heat balance, improving the primary and auxiliary equipment, and, which is the main thing, by increasing the throttle conditions. As a result of the enhanced efficiency, emissions of hazardous substances into the atmosphere, including carbon dioxide, the "greenhouse" gas, are reduced. To date, the exhaust steam conditions in the world power industry are p 0 ≈ 30 MPa and t 0 = 610/620°C. The efficiency of such power plants reaches 47%. The OSC plants are being operated in Germany, Denmark, Japan, China, and Korea; pilot plants are being developed in Russia. Currently, a project of a power plant for the ultra-supercritical steam conditions p 0 ≈ 35 MPa and t 0 = 700/720°C with efficiency of approximately 50% is being studied in the EU within the framework of the Thermie AD700 program, project AD 700PF. Investigations in this field have also been launched in the United States, Japan, and China. Engineering solutions are also being sought in Russia by the All-Russia Thermal Engineering Research Institute (VTI) and the Moscow Power Engineering Institute. The stated steam parameter level necessitates application of new materials, namely, nickel-base alloys. Taking into consideration high costs of nickel-base alloys and the absence in Russia of technologies for their production and manufacture of products from these materials for steam-turbine power plants, the development of power plants for steam parameters of 32 MPa and 650/650°C should be considered to be the first stage in creating the USC plants as, to achieve the above parameters, no expensive alloys are require. To develop and

  2. A systematic approach to assessing measurement uncertainty for CO2 emissions from coal-fired power plants

    DEFF Research Database (Denmark)

    Wagner, Claas; Esbensen, Kim

    2011-01-01

    An augmented measurement uncertainty approach for CO2 emissions from coal-fired power plants with a focus on the often forgotten contributions from sampling errors occurring over the entire fuel-to-emission pathway is presented. Current methods for CO2 emission determination are evaluated in detail......, from which a general matrix scheme is developed that includes all factors and stages needed for total CO2 determination, which is applied to the monitoring plan of a representative medium-sized coal-fired power plant. In particular sampling involved significant potential errors, as identified...... of these three materials were also given full attention. A systematic error (bias) is present in the current sampling approach, which increases the present uncertainty estimate unnecessarily. For both primary sampling and analytical sample extraction steps, random variations, which hitherto only have been...

  3. Scrubbing system design for CO2 capture in coal-fired power plants

    International Nuclear Information System (INIS)

    Heischkamp, Elizabeth

    2017-01-01

    Within the last decades a continuous tightening of environmental regulations has been observed in several countries around the world. These include restriction of anthropogenic CO 2 emissions, since they are considered responsible for intensifying global warming. Coal-fired power plants represent a good possibility for capturing CO 2 before it is emitted in the atmosphere, thereby contributing to combat global warming. This work focuses on reducing the CO 2 emissions of such a power plant by 90 %. For this purpose a hard coal power plant is retrofitted with a chemical absorption using different solutions of piperazine promoted potassium carbonate. The resulting power plant's efficiency losses have been accounted for. A comparison of different scenarios such as the variation of operating parameters offer an insight in detecting suitable operating conditions that will allow to minimize efficiency penalties. Simulation details are provided along with a technical and an economic analysis.

  4. Electrostatic precipitators for coal thermal power plants energized by means of narrow pulse voltage

    Energy Technology Data Exchange (ETDEWEB)

    Dinelli, G.; Mattachini, F.; Bogani, V.; Baldacci, A.; Tarli, R. (ENEL-CRTN, Direzione Studi e Ricerche, Milan (Italy) ENEL, VDT Settore Tecnico, Direzione Produzione e Trasmissione, Rome (Italy))

    1990-09-01

    The efficiency of electrostatic precipitators, widely used in thermal power plants to clean flue gases from solid particulate, is strongly dependent both on the way particles are electrically charged and on the characteristics of the electric field within the interelectrodic space of the precipitator. Such operating may become inadequate under varying particle characteristics and operating conditions of the thermal plant, therefore bringing to a reduction in the precipitator collection efficiency. An innovative technique, by generating a pulsed corona in the precipitator, allows a substantial improvement of both the particle charging and the collection processes and an increase in the operation flexibility of the electrostatic precipitator. The narrow pulse voltage energization has been extensively tested at a coal thermal unit having the electrostatic precipitators equipped with both conventional and pulse power sets. The long duration tests confirmed the following results: 1) high reliability of the pulse power sets and a considerable improvement in the precipitator collection efficiency; 2) a decrease in the particulate emissions, with coals whose ashes are of difficult collection, ranging between 75% and 85% of those with conventional energization; 3) a reduction by a factor of about 5 in the consumption of electric power by the electrostatic precipitation process.

  5. Efficiency assessment and benchmarking of thermal power plants in India

    International Nuclear Information System (INIS)

    Shrivastava, Naveen; Sharma, Seema; Chauhan, Kavita

    2012-01-01

    Per capita consumption of electricity in India is many folds lesser than Canada, USA, Australia, Japan, Chaina and world average. Even though, total energy shortage and peaking shortage were recorded as 11.2% and 11.85%, respectively, in 2008–09 reflecting non-availability of sufficient supply of electricity. Performance improvement of very small amount can lead to large contribution in financial terms, which can be utilized for capacity addition to reduce demand supply gap. Coal fired thermal power plants are main sources of electricity in India. In this paper, relative technical efficiency of 60 coal fired power plants has been evaluated and compared using CCR and BCC models of data envelopment analysis. Target benchmark of input variables has also been evaluated. Performance comparison includes small versus medium versus large power plants and also state owned versus central owned versus private owned. Result indicates poor performance of few power plants due to over use of input resources. Finding reveals that efficiency of small power plants is lower in comparison to medium and large category and also performance of state owned power plants is comparatively lower than central and privately owned. Study also suggests different measures to improve technical efficiency of the plants. - Highlights: ► This study evaluates relative technical efficiency of 60 coal fired thermal power plants of India. ► Input oriented CCR and BCC models of data envelopment analysis have been used. ► Small, medium and large power plants have been compared. ► Study will help investor while setting up new power projects. ► Power plants of different ownerships have also been compared.

  6. Water Extraction from Coal-Fired Power Plant Flue Gas

    Energy Technology Data Exchange (ETDEWEB)

    Bruce C. Folkedahl; Greg F. Weber; Michael E. Collings

    2006-06-30

    The overall objective of this program was to develop a liquid disiccant-based flue gas dehydration process technology to reduce water consumption in coal-fired power plants. The specific objective of the program was to generate sufficient subscale test data and conceptual commercial power plant evaluations to assess process feasibility and merits for commercialization. Currently, coal-fired power plants require access to water sources outside the power plant for several aspects of their operation in addition to steam cycle condensation and process cooling needs. At the present time, there is no practiced method of extracting the usually abundant water found in the power plant stack gas. This project demonstrated the feasibility and merits of a liquid desiccant-based process that can efficiently and economically remove water vapor from the flue gas of fossil fuel-fired power plants to be recycled for in-plant use or exported for clean water conservation. After an extensive literature review, a survey of the available physical and chemical property information on desiccants in conjunction with a weighting scheme developed for this application, three desiccants were selected and tested in a bench-scale system at the Energy and Environmental Research Center (EERC). System performance at the bench scale aided in determining which desiccant was best suited for further evaluation. The results of the bench-scale tests along with further review of the available property data for each of the desiccants resulted in the selection of calcium chloride as the desiccant for testing at the pilot-scale level. Two weeks of testing utilizing natural gas in Test Series I and coal in Test Series II for production of flue gas was conducted with the liquid desiccant dehumidification system (LDDS) designed and built for this study. In general, it was found that the LDDS operated well and could be placed in an automode in which the process would operate with no operator intervention or

  7. Diagnosis and on-line displacement monitoring for critical pipe of fossil power plant

    Energy Technology Data Exchange (ETDEWEB)

    Heo, J. S.; Hyun, J. S. [Korea Electric Power Corporation, Seoul (Korea, Republic of); Heo, J. R.; Lee, S. K.; Cho, S. Y. [Korea South-East Power Co., Ltd., Seoul (Korea, Republic of)

    2009-07-01

    High temperature steam pipes of fossil power plant are subject to a severe thermal range and usually operates well into the creep range. Cyclic operation of the plant subjects the piping system to mechanical and thermal fatigue mechanisms and poor or malfunctional support assemblies can impose massive loads or stress onto the piping system. In order to prevent the serious damage and failure of the critical pipe system, various inspection methods such as visual inspection, computational analysis and on-line piping displacement monitoring were developed. 3-Dimensional piping displacement monitoring system was developed with using he aluminum alloy rod and rotary encoder type sensors, this system was installed and operated on the 'Y' fossil power plant successfully. It is expected that this study will contribute to the safety of piping system, which could minimize stress and extend the actual life of critical piping.

  8. Environmental impacts of coal mine and thermal power plant to the surroundings of Barapukuria, Dinajpur, Bangladesh.

    Science.gov (United States)

    Hossain, Md Nazir; Paul, Shitangsu Kumar; Hasan, Md Muyeed

    2015-04-01

    The study was carried out to analyse the environmental impacts of coal mine and coal-based thermal power plant to the surrounding environment of Barapukuria, Dinajpur. The analyses of coal, water, soil and fly ash were carried out using standard sample testing methods. This study found that coal mining industry and coal-based thermal power plant have brought some environmental and socio-economic challenges to the adjacent areas such as soil, water and air pollution, subsidence of agricultural land and livelihood insecurity of inhabitants. The pH values, heavy metal, organic carbon and exchangeable cations of coal water treated in the farmland soil suggest that coal mining deteriorated the surrounding water and soil quality. The SO4(2-) concentration in water samples was beyond the range of World Health Organisation standard. Some physico-chemical properties such as pH, conductivity, moisture content, bulk density, unburned carbon content, specific gravity, water holding capacity, liquid and plastic limit were investigated on coal fly ash of Barapukuria thermal power plant. Air quality data provided by the Barapukuria Coal Mining Company Limited were contradictory with the result of interview with the miners and local inhabitants. However, coal potentially contributes to the development of economy of Bangladesh but coal mining deteriorates the environment by polluting air, water and soil. In general, this study includes comprehensive baseline data for decision makers to evaluate the feasibility of coal power industry at Barapukuria and the coalmine itself.

  9. Is There Any Future For Coal Power Plants In Europe?

    Directory of Open Access Journals (Sweden)

    A. V. Zimakov

    2017-01-01

    Full Text Available The article deals with the policies of EU countries towards coal power plants as well as practical steps taken by their governments. Coal power plants are widely considered to be environmentally harmful which confronts with environmental policies of the EU suggesting Europe-wide cuts of greenhouse gas emissions. Based on that assumption a number of EU countries such asBelgium,Austria,Portugal,Dania,Finland,SwedenandUKare striving to phase out coal power plants and achieved significant progress on this path replacing coal with other generation sources. On the other hand, other EU members are lagging behind as coal phase-out is not an urgent item of their political agenda. This situation is typical forIreland,Netherlands,Italy,Croatia,SloveniaandSlovakia. Domestic coal extracting industry can pose a significant hindering factor for a coal power plants phase-out and can effectively block the process. This is the case inBulgaria,Romania,Hungary,CzechRepublic,GreeceandPoland. ButGermany, which also has a well-developed coal industry, transforms its energy sector towards a green one cutting the share of coal in the generation mix. If this effort of the German government proves successful it will deliver a positive transformation model for other EU countries with a large share of coal in generation-mix due to domestic coal extraction industry. The analysis of the political and economic (both macro and micro processes leads to conclusion that there is no unity among EU member states in their approach towards coal fired power plants phase-out. This will allow for coal power plants to retain their market share in a short to medium term. But in the longer run one can expect a significant decrease of coal fired generation inEurope, even in the countries traditionally dependent on coal.

  10. Current Status of Fire Risk Assessment in Germany

    International Nuclear Information System (INIS)

    Berg, H. P.

    2002-01-01

    The approach for fire risk assessment to be applied within periodic safety reviews of nuclear power plants in Germany starts with a screening process providing critical fire zones in which a fully developed fire has the potential to both cause an initiating event and impair the function of at least one component or system critical to safety. The second step is to perform a quantitative analysis. For that purpose, a standard event tree has been developed with elements for fire initiation, ventilation of the room, fire detection, fire suppression, and fire propagation. This standard event tree has to be adapted to each critical fire zone or room. In a final step, the fire induced frequency of initiating events, the main contributors and the calculated hazard state frequency for the fire event are determined. In order to perform a quantitative fire risk assessment, a basic data base must be established which should, e.g., include initiating frequencies, reliability data for all fire protection measures, fire barriers, etc. Detailed plant-specific information is needed on ignition sources, detection and extinguishing systems, manual fire fighting, stationary fire suppression systems. As one contributor to fire specific PSA input data, reliability data for the active fire protection measures are required for the application in the fire specific event tree analysis. These data needed to be estimated are unavailabilities per demand or failure rates per hour of plant operation for those components or systems belonging to the active fire protection means. The data on potential failures or unavailabilities per demand of the respective fire protection measures were gained from the plant specific documentation of inspection and maintenance. The assessment whether the detected findings are estimated as failures or only as deficiencies or deteriorations requires a deep insight in the plant specific operating conditions for the fire protection means and needs careful engineering

  11. Stress-reducing preventive maintenance model for a unit under stressful environment

    International Nuclear Information System (INIS)

    Park, J.H.; Chang, Woojin; Lie, C.H.

    2012-01-01

    We develop a preventive maintenance (PM) model for a unit operated under stressful environment. The PM model in this paper consists of a failure rate model and two cost models to determine the optimal PM scheduling which minimizes a cost rate. The assumption for the proposed model is that stressful environment accelerates the failure of the unit and periodic maintenances reduce stress from outside. The failure rate model handles the maintenance effect of PM using improvement and stress factors. The cost models are categorized into two failure recognition cases: immediate failure recognition and periodic failure detection. The optimal PM scheduling is obtained by considering the trade-off between the related cost and the lifetime of a unit in our model setting. The practical usage of our proposed model is tested through a numerical example.

  12. Impact of proximity of thermoelectric power plants on bronchial obstructive crisis rates

    Directory of Open Access Journals (Sweden)

    Tamara Ugarte-Avilés

    2017-01-01

    Full Text Available Abstract Background Environmental pollution is a risk factor for cardiorespiratory diseases. Energy generated by thermoelectric power plants (TEPP represents a relevant source of pollution. The aim of this study was to evaluate the relationship between living near a coal-fired TEPP and the consultation rates for bronchial obstructive crises (BOC in the province of Concepción, Chile. Methods Population-based study. The epidemiological weeks from 2012 to 2014 were analyzed. The dependent variable was the emergency consultation rate for BOC in two health centers within 5 km of a TEPP (Coronel and two that were more than 40 Km away from a TEPP (Talcahuano. The independent variables were the commune, climatological variables (air temperature and relative atmospheric humidity, environmental pollutants (PM10, PM2.5 and nitrogen oxide, weeks with the highest consultation rate and the years. Rates, Pearson’s correlation and gross risk measures were calculated and adjusted for environmental and climatological variables. Results BOC rates were significantly higher in Coronel (RR = 4.9 95% CI 4.0–5.8; p < 0.05. The PM2.5 it showed the strongest correlation with BOC rates (r = 0.3; p < 0.01 in Coronel, but not Talcahuano. Linear regression modelling indicated that proximity to a TEPP (health center location and temperature explained 26 and 18% of the variance in BOC rates, respectively. Conclusions Rates of emergency consultation for BOC were significantly higher among a population living within 5 km of a coal-fired TEPP than those living 40 km away.

  13. Best power mix under nuclear-decreasing society

    International Nuclear Information System (INIS)

    Koyama, Michihisa; Nakao, Kazuhide

    2012-01-01

    East Japan Great Earthquake and the subsequent failures of nuclear power plants compel Japanese to consider a new paradigm of national energy policy. In this study, we discuss the future power mix scenario considering a variety of power options; nuclear, coal fire, LNG fire, oil fire, LNG combined cycle, hydro, hydropump, battery, photovoltaic, wind, and geothermal. Future developments of installed capacity, properties such as efficiency, etc. are discussed for each type of power option. Seven sets of daily demand profile are used. Power generation mix model developed in preceding studies is used to estimate the installation and operation of each power option for representative years of 2010, 2020, 2030, 2040, and 2050. Future power mix is discussed on the basis of results from power generation mix model. (author)

  14. Thermal power plant efficiency enhancement with Ocean Thermal Energy Conversion

    International Nuclear Information System (INIS)

    Soto, Rodrigo; Vergara, Julio

    2014-01-01

    In addition to greenhouse gas emissions, coastal thermal power plants would gain further opposition due to their heat rejection distressing the local ecosystem. Therefore, these plants need to enhance their thermal efficiency while reducing their environmental offense. In this study, a hybrid plant based on the principle of Ocean Thermal Energy Conversion was coupled to a 740 MW coal-fired power plant project located at latitude 28°S where the surface to deepwater temperature difference would not suffice for regular OTEC plants. This paper presents the thermodynamical model to assess the overall efficiency gained by adopting an ammonia Rankine cycle plus a desalinating unit, heated by the power plant condenser discharge and refrigerated by cold deep seawater. The simulation allowed us to optimize a system that would finally enhance the plant power output by 25–37 MW, depending on the season, without added emissions while reducing dramatically the water temperature at discharge and also desalinating up to 5.8 million tons per year. The supplemental equipment was sized and the specific emissions reduction was estimated. We believe that this approach would improve the acceptability of thermal and nuclear power plant projects regardless of the plant location. -- Highlights: • An Ocean Thermal Energy Conversion hybrid plant was designed. • The waste heat of a power plant was delivered as an OTEC heat source. • The effect of size and operating conditions on plant efficiency were studied. • The OTEC implementation in a Chilean thermal power plant was evaluated. • The net efficiency of the thermal power plant was increased by 1.3%

  15. Thermodynamic performance analysis of a novel electricity-heating cogeneration system (EHCS) based on absorption heat pump applied in the coal-fired power plant

    International Nuclear Information System (INIS)

    Zhang, Hongsheng; Li, Zhenlin; Zhao, Hongbin

    2015-01-01

    Highlights: • Presented a novel waste heat recovery method for Combined Heat and Power system. • Established models of the integrated system based on energy and exergy analysis. • Adopted both design and actual data ensuring the reliability of analysis results. - Abstract: A novel electricity-heating cogeneration system (EHCS) which is equipped with an absorption heat pump (AHP) system to recover waste heat from exhaust steam of the steam turbines in coal-fired thermal power plants is proposed to reduce heating energy consumption and improve the utilization of the fossil fuels in existing CHP (Combined Heat and Power) systems. According to the first and second thermodynamic law, the changes of the performance evaluation indicators are analyzed, and exergy analyses for key components of the system are carried out as well as changes of exergy indexes focusing on 135 MW direct air cooling units before and after modification. Compared with the conventional heating system, the output power increases by about 3.58 MW, gross coal consumption rate and total exergy loss respectively reduces by 11.50 g/kW h and 4.649 MW, while the total thermal and exergy efficiency increases by 1.26% and 1.45% in the EHCS when the heating load is 99,918 kJ at 75% THA condition. Meanwhile, the decrement of total exergy loss and increment of total exergy efficiency increase with the increasing of the heating load. The scheme cannot only bring great economic benefits but also save fossil resources, which has a promising market application potential.

  16. Water use at pulverized coal power plants with postcombustion carbon capture and storage.

    Science.gov (United States)

    Zhai, Haibo; Rubin, Edward S; Versteeg, Peter L

    2011-03-15

    Coal-fired power plants account for nearly 50% of U.S. electricity supply and about a third of U.S. emissions of CO(2), the major greenhouse gas (GHG) associated with global climate change. Thermal power plants also account for 39% of all freshwater withdrawals in the U.S. To reduce GHG emissions from coal-fired plants, postcombustion carbon capture and storage (CCS) systems are receiving considerable attention. Current commercial amine-based capture systems require water for cooling and other operations that add to power plant water requirements. This paper characterizes and quantifies water use at coal-burning power plants with and without CCS and investigates key parameters that influence water consumption. Analytical models are presented to quantify water use for major unit operations. Case study results show that, for power plants with conventional wet cooling towers, approximately 80% of total plant water withdrawals and 86% of plant water consumption is for cooling. The addition of an amine-based CCS system would approximately double the consumptive water use of the plant. Replacing wet towers with air-cooled condensers for dry cooling would reduce plant water use by about 80% (without CCS) to about 40% (with CCS). However, the cooling system capital cost would approximately triple, although costs are highly dependent on site-specific characteristics. The potential for water use reductions with CCS is explored via sensitivity analyses of plant efficiency and other key design parameters that affect water resource management for the electric power industry.

  17. Infrared optical properties of a coal-fired power plant plume

    International Nuclear Information System (INIS)

    Stearns, L.P.; Pueschel, R.F.

    1983-01-01

    Infrared measurements in the 8--14-μm spectral region were made of two coal-fired power plant plumes and area haze in the Four Corners region of New Mexico from 1 to 7 Nov. 1980. The layer tranmittance, optical depth, and volume extinction coefficient derived from measurements on four nonconsecutive days show the effects of the plumes on the IR optical properties of the atmosphere. The average contribution of the plume alone to the IR extinction coefficient was 74% at the Four Corners plant; the background haze contributed 7--11%. More efficient particulate emission control at the San Juan power plant reduced the average contribution of its plume to 57% of the extinction coefficient. The haze contributed an average of 16%. The results show an increase with time of the haze bulk extinction coefficient during a persistent anticyclonic synoptic situation. Extinction coefficients of the haze showed a linearity with particulate loading, which led to estimates of IR volume extinctions of the free troposphre from aerosol measurements

  18. Ultra-supercritical (USC) technology. The best practical and economic way to reduce CO{sub 2} emissions from coal fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Mao, Jianxiong [Tsinghua Univ., Beijing (China). Dept. of Thermal Engineering

    2013-07-01

    China is the largest coal producer and consumer with largest coal power capacity in the world. By the end of 2010, the total installed power capacity in China was 962,190 MWe, in which coal fired power capacity was 706,630 MWe, accounting for over 73.4%. China has been the largest CO{sub 2} emission country as well and its huge coal power capacity is the largest CO{sub 2} emission source. How does China reduce its CO{sub 2} emissions from coal fired power plants is an austere challenge now we are facing. How does China reduce its CO{sub 2} emissions from coal fired power plants? There are three ways to reduce CO{sub 2} emissions from coal fired power plants: (1) carbon capture and storage (CCS); (2) co-firing biomass with coal; (3) much improvement of efficiency. For the first option of CCS, the technology is still under development and there are still several uncertainties today to be widely used for coal fired power plants in the short term. For the second option of biomass co-firing, it can reduce CO{sub 2} emissions in a way, but it is difficult to implement it in China without strong support of incentive policy. Therefore, the third option of improvement of efficiency is the only but also the best and feasible economic option for China to much reduce CO{sub 2} emissions from coal fired power plants. This paper will discuss how China to take a active policy to strongly promote the application of supercritical (SC)/Ultra supercritical (USC) technology. Only in 4 years from 2007 to 2010, ordered capacity of coal fired SC/USC units was 482 units with installed capacity of 230,060 MWe, in which, 1,000 MWe USC with 600 C steam parameters was almost 100 units with 100,000 MWe in which 33 units have been in operation. Today, China has been a country with the largest SC/USC units and capacity. The fast application of SC/USC units for coal fired power plants has resulted in energy saving and reduction of emissions. The average coal consumption in China reduced from 366

  19. Critical crack path assessments in failure investigations

    Directory of Open Access Journals (Sweden)

    Robert D. Caligiuri

    2015-10-01

    Full Text Available This paper presents a case study in which identification of the controlling crack path was critical to identifying the root cause of the failure. The case involves the rupture of a 30-inch (0.76 m natural gas pipeline in 2010 that tragically led to the destruction of a number of homes and the loss of life. The segment of the pipeline that ruptured was installed in 1956. The longitudinal seam of the segment that ruptured was supposed to have been fabricated by double submerged arc welding. Unfortunately, portions of the segment only received a single submerged arc weld on the outside, leaving unwelded areas on the inside diameter. Post-failure examination of the segment revealed that the rupture originated at one of these unwelded areas. Examination also revealed three additional crack paths or zones emanating from the unwelded area: a zone of ductile tearing, a zone of fatigue, and a zone of cleavage fracture, in that sequence. Initial investigators ignored the ductile tear, assumed the critical crack path was the fatigue component, and (incorrectly concluded that the root cause of the incident was the failure of the operator to hydrotest the segment after it was installed in 1956. However, as discussed in this paper, the critical path or mechanism was the ductile tear. Furthermore, it was determined that the ductile tear was created during the hydrotest at installation by a mechanism known as pressure reversal. Thus the correct root cause of the rupture was the hydrotest the operator subjected the segment to at installation, helping to increase the awareness of operators and regulators about the potential problems associated with hydrotesting.

  20. Residence in Proximity of a Coal-Oil-Fired Thermal Power Plant and Risk of Lung and Bladder Cancer in North-Eastern Italy. A Population-Based Study: 1995-2009.

    Science.gov (United States)

    Collarile, Paolo; Bidoli, Ettore; Barbone, Fabio; Zanier, Loris; Del Zotto, Stefania; Fuser, Simonetta; Stel, Fulvio; Panato, Chiara; Gallai, Irene; Serraino, Diego

    2017-07-31

    This study investigated the risk of lung and bladder cancers in people residing in proximity of a coal-oil-fired thermal power plant in an area of north-eastern Italy, covered by a population-based cancer registry. Incidence rate ratios (IRR) by sex, age, and histology were computed according to tertiles of residential exposure to benzene, nitrogen dioxide (NO2), particular matter, and sulfur dioxide (SO2) among 1076 incident cases of lung and 650 cases of bladder cancers. In men of all ages and in women under 75 years of age, no significant associations were observed. Conversely, in women aged ≥75 years significantly increased risks of lung and bladder cancers were related to high exposure to benzene (IRR for highest vs. lowest tertile: 2.00 for lung cancer and 1.94 for bladder cancer) and NO2 (IRR: 1.72 for lung cancer; and 1.94 for bladder cancer). In these women, a 1.71-fold higher risk of lung cancer was also related to a high exposure to SO2. Acknowledging the limitations of our study, in particular that we did not have information regarding cigarette smoking habits, the findings of this study indicate that air pollution exposure may have had a role with regard to the risk of lung and bladder cancers limited to women aged ≥75 years. Such increased risk warrants further analytical investigations.

  1. Development of a Field Demonstration for Cost-Effective Low-Grade Heat Recovery and Use Technology Designed to Improve Efficiency and Reduce Water Usage Rates for a Coal-Fired Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Noble, Russell [Southern Company Services, Incorporated, Birmingham, AL (United States); Dombrowski, K. [AECOM Technical Services, Austin, TX (United States); Bernau, M. [AECOM Technical Services, Austin, TX (United States); Morett, D. [AECOM Technical Services, Austin, TX (United States); Maxson, A. [EPRI, Palo Alto, CA (United States); Hume, S. [EPRI, Palo Alto, CA (United States)

    2016-06-30

    Coal-based power generation systems provide reliable, low-cost power to the domestic energy sector. These systems consume large amounts of fuel and water to produce electricity and are the target of pending regulations that may require reductions in water use and improvements in thermal efficiency. While efficiency of coal-based generation has improved over time, coal power plants often do not utilize the low-grade heat contained in the flue gas and require large volumes of water for the steam cycle make-up, environmental controls, and for process cooling and heating. Low-grade heat recovery is particularly challenging for coal-fired applications, due in large part to the condensation of acid as the flue gas cools and the resulting potential corrosion of the heat recovery materials. Such systems have also not been of significant interest as recent investments on coal power plants have primarily been for environmental controls due to more stringent regulations. Also, in many regions, fuel cost is still a pass-through to the consumer, reducing the motivation for efficiency improvements. Therefore, a commercial system combining low-grade heat-recovery technologies and associated end uses to cost effectively improve efficiency and/or reduce water consumption has not yet been widely applied. However, pressures from potential new regulations and from water shortages may drive new interest, particularly in the U.S. In an effort to address this issue, the U.S. Department of Energy (DOE) has sought to identify and promote technologies to achieve this goal.

  2. Selective angiographic embolization of blunt splenic traumatic injuries in adults decreases failure rate of nonoperative management.

    Science.gov (United States)

    Bhullar, Indermeet S; Frykberg, Eric R; Siragusa, Daniel; Chesire, David; Paul, Julia; Tepas, Joseph J; Kerwin, Andrew J

    2012-05-01

    To determine whether angioembolization (AE) in hemodynamically stable adult patients with blunt splenic trauma (BST) at high risk for failure of nonoperative management (NOM) (contrast blush [CB] on computed tomography, high-grade IV-V injuries, or decreasing hemoglobin) results in lower failure rates than reported. The records of patients with BST from July 2000 to December 2010 at a Level I trauma center were retrospectively reviewed using National Trauma Registry of the American College of Surgeons. Failure of NOM (FNOM) occurred if splenic surgery was required after attempted NOM. Logistic regression analysis was used to identify factors associated with FNOM. A total of 1,039 patients with BST were found. Pediatric patients (age <17 years), those who died in the emergency department, and those requiring immediate surgery for hemodynamic instability were excluded. Of the 539 (64% of all BST) hemodynamically stable patients who underwent NOM, 104 (19%) underwent AE and 435 (81%) were observed without AE (NO-AE). FNOM for the various groups were as follows: overall NOM (4%), NO-AE (4%), and AE (4%). There was no significant difference in FNOM for NO-AE versus AE for grades I to III: grade I (1% vs. 0%, p = 1), grade II (2% vs. 0%, p = 0.318), and grade III (5% vs. 0%, p = 0.562); however, a significant decrease in FNOM was noted with the addition of AE for grades IV to V: grade IV (23% vs. 3%, p = 0.04) and grade V (63% vs. 9%, p = 0.03). Statistically significant independent risk factors for FNOM were grade IV to V injuries and CB. Application of strictly defined selection criteria for NOM and AE in patients with BST resulted in one of the lowest overall FNOM rates (4%). Hemodynamically stable BST patients are candidates for NOM with selective AE for high-risk patients with grade IV to V injuries, CB on initial computed tomography, and/or decreasing hemoglobin levels. III, therapeutic study.

  3. Do emission ceilings ruin coal-fired power plants?; Emissieplafonds nekken kolencentrales?

    Energy Technology Data Exchange (ETDEWEB)

    Wijmenga, J. [Ministerie van Infrastructuur en Milieu, Den Haag (Netherlands)

    2011-04-15

    The case of the new coal-fired power plants has already racked the brains of many. The advice offered to the court by the attorney-general constitutes the next step in this process. A temporary solution has been found for the coal-fired plants, but one question remains unanswered so far: how should an emission ceiling be used as a test instrument for permits? This article provides a direction in which a solution can be found. [Dutch] De zaak betreffende de nieuwe kolencentrales heeft al tot heel wat hoofdbrekens geleid. Het advies dat de advocaat-generaal heeft uitgebracht aan het hof is een volgende stap in dit proces. Voor de kolencentrales is een tijdelijke oplossing gevonden, maar de vraag is nog niet beantwoord hoe een emissieplafond moet worden gebruikt als toetsinstrument voor vergunningen. In dit artikel wordt aangegeven in welke richting een oplossing kan worden gezocht.

  4. Prediction of the time-dependent failure rate for normally operating components taking into account the operational history

    International Nuclear Information System (INIS)

    Vrbanic, I.; Simic, Z.; Sljivac, D.

    2008-01-01

    The prediction of the time-dependent failure rate has been studied, taking into account the operational history of a component used in applications such as system modeling in a probabilistic safety analysis in order to evaluate the impact of equipment aging and maintenance strategies on the risk measures considered. We have selected a time-dependent model for the failure rate which is based on the Weibull distribution and the principles of proportional age reduction by equipment overhauls. Estimation of the parameters that determine the failure rate is considered, including the definition of the operational history model and likelihood function for the Bayesian analysis of parameters for normally operating repairable components. The operational history is provided as a time axis with defined times of overhauls and failures. An example for demonstration is described with prediction of the future behavior for seven different operational histories. (orig.)

  5. The impact of the time interval on in-vitro fertilisation success after failure of the first attempt.

    Science.gov (United States)

    Bayoglu Tekin, Y; Ceyhan, S T; Kilic, S; Korkmaz, C

    2015-05-01

    The aim of this study was to identify the optimal time interval for in-vitro fertilisation that would increase treatment success after failure of the first attempt. This retrospective study evaluated 454 consecutive cycles of 227 infertile women who had two consecutive attempts within a 6-month period at an IVF centre. Data were collected on duration of stimulation, consumption of gonadotropin, numbers of retrieved oocytes, mature oocytes, fertilised eggs, good quality embryos on day 3/5 following oocyte retrieval and clinical and ongoing pregnancy. There were significant increases in clinical pregnancy rates at 2-, 3- and 4-month intervals. The maximum increase was after two menstrual cycles (p = 0.001). The highest rate of ongoing pregnancy was in women that had the second attempt after the next menstrual cycle following failure of IVF (27.2%). After IVF failure, initiating the next attempt within 2-4 months increases the clinical pregnancy rates.

  6. Increasing inhibitory input increases neuronal firing rate: why and when? Diffusion process cases

    Energy Technology Data Exchange (ETDEWEB)

    Feng Jianfeng [COGS, Sussex University (United Kingdom)]. E-mail: jf218@cam.ac.uk; Wei Gang [Department of Mathematics, Hong Kong Baptist University, Hong Kong (China)]. E-mail gwei@math.hkbu.edu.hk

    2001-09-21

    Increasing inhibitory input to single neuronal models, such as the FitzHugh-Nagumo model and the Hodgkin-Huxley model, can sometimes increase their firing rates, a phenomenon which we term inhibition-boosted firing (IBF). Here we consider neuronal models with diffusion approximation inputs, i.e. they share the identical first- and second-order statistics of the corresponding Poisson process inputs. Using the integrate-and-fire model and the IF-FHN model, we explore theoretically how and when IBF can happen. For both models, it is shown that there is a critical input frequency at which the efferent firing rate is identical when the neuron receives purely excitatory inputs or exactly balanced inhibitory and excitatory inputs. When the input frequency is lower than the critical frequency, IBF occurs. (author)

  7. Coal-fired power materials - Part II

    Energy Technology Data Exchange (ETDEWEB)

    Viswanathan, V.; Purgert, R.; Rawls, P. [Electric Power Research Institute, Palo Alto, CA (United States)

    2008-09-15

    Part 1 discussed some general consideration in selection of alloys for advanced ultra supercritical (USC) coal-fired power plant boilers. This second part covers results reported by the US project consortium, which has extensively evaluated the steamside oxidation, fireside corrosion, and fabricability of the alloys selected for USC plants. 3 figs.

  8. Experiences with high temperature corrosion at straw‐firing power plants in Denmark

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Jensen, S. A.; Borg, U.

    2011-01-01

    to enable better lifetime prediction of vulnerable components in straw‐firing plants since the corrosion rates are so much faster than in coal firing plants. Therefore, there are continued investigations in recently commissioned plants with test tubes installed into actual superheaters. In addition...... temperature is measured on the specific tube loops where there are test tube sections. Thus a corrosion rate can be coupled to a temperature histogram. This is important since although a superheater has a defined steam outlet temperature, there is variation in the tube bundle due to variations of heat flux...

  9. Human cognitive task distribution model for maintenance support system of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Young Ho

    2007-02-15

    In human factors research, more attention has been devoted to the operation of nuclear power plants (NPPs) than to their maintenance. However, human error related to maintenance is 45% among the total human errors from 1990 to 2005 in Korean nuclear power plants. Therefore, it is necessary to study human factors in the maintenance of an NPP. There is a current trend toward introducing digital technology into both safety and non-safety systems in NPPs. A variety of information about plant conditions can be used digitally. In the future, maintenance support systems will be developed based on an information-oriented NPP. In this context, it is necessary to study the cognitive tasks of the personnel involved in maintenance and the interaction between the personnel and maintenance support systems. The fundamental purpose of this work is how to distribute the cognitive tasks of the personnel involved in the maintenance in order to develop a maintenance support system that considers human factors. The second purpose is to find the causes of errors due to engineers or maintainers and propose system functions that are countermeasures to reduce these errors. In this paper, a cognitive task distribution model of the personnel involved in maintenance is proposed using Rasmussen's decision making model. First, the personnel were divided into three groups: the operators (inspectors), engineers, and maintainers. Second, human cognitive tasks related to maintenance were distributed based on these groups. The operators' cognitive tasks are detection and observation; the engineers' cognitive tasks are identification, evaluation, target state, select target, and procedure: and the maintainers' cognitive task is execution. The case study is an analysis of failure reports related to human error in maintenance over a period of 15years. By using error classification based on the information processing approach, the human errors involved in maintenance were classified

  10. Human cognitive task distribution model for maintenance support system of a nuclear power plant

    International Nuclear Information System (INIS)

    Park, Young Ho

    2007-02-01

    In human factors research, more attention has been devoted to the operation of nuclear power plants (NPPs) than to their maintenance. However, human error related to maintenance is 45% among the total human errors from 1990 to 2005 in Korean nuclear power plants. Therefore, it is necessary to study human factors in the maintenance of an NPP. There is a current trend toward introducing digital technology into both safety and non-safety systems in NPPs. A variety of information about plant conditions can be used digitally. In the future, maintenance support systems will be developed based on an information-oriented NPP. In this context, it is necessary to study the cognitive tasks of the personnel involved in maintenance and the interaction between the personnel and maintenance support systems. The fundamental purpose of this work is how to distribute the cognitive tasks of the personnel involved in the maintenance in order to develop a maintenance support system that considers human factors. The second purpose is to find the causes of errors due to engineers or maintainers and propose system functions that are countermeasures to reduce these errors. In this paper, a cognitive task distribution model of the personnel involved in maintenance is proposed using Rasmussen's decision making model. First, the personnel were divided into three groups: the operators (inspectors), engineers, and maintainers. Second, human cognitive tasks related to maintenance were distributed based on these groups. The operators' cognitive tasks are detection and observation; the engineers' cognitive tasks are identification, evaluation, target state, select target, and procedure: and the maintainers' cognitive task is execution. The case study is an analysis of failure reports related to human error in maintenance over a period of 15years. By using error classification based on the information processing approach, the human errors involved in maintenance were classified

  11. Ash fouling monitoring and key variables analysis for coal fired power plant boiler

    Directory of Open Access Journals (Sweden)

    Shi Yuanhao

    2015-01-01

    Full Text Available Ash deposition on heat transfer surfaces is still a significant problem in coal-fired power plant utility boilers. The effective ways to deal with this problem are accurate on-line monitoring of ash fouling and soot-blowing. In this paper, an online ash fouling monitoring model based on dynamic mass and energy balance method is developed and key variables analysis technique is introduced to study the internal behavior of soot-blowing system. In this process, artificial neural networks (ANN are used to optimize the boiler soot-blowing model and mean impact values method is utilized to determine a set of key variables. The validity of the models has been illustrated in a real case-study boiler, a 300MW Chinese power station. The results on same real plant data show that both models have good prediction accuracy, while the ANN model II has less input parameters. This work will be the basis of a future development in order to control and optimize the soot-blowing of the coal-fired power plant utility boilers.

  12. Potentially damaging failure modes of high- and medium-voltage electrical equipment

    International Nuclear Information System (INIS)

    Hoy, H.C.

    1984-01-01

    The high- and medium-voltage electrical equipment failures of both nuclear and nonnuclear electric utilities have been reviewed for possible disruptive failure modes that would be of special concern in a nuclear power plant. The resulting emphasis was on the electrical faults of transformers, switchgear (circuit breakers), lightning (surge) arrestors, high-voltage cabling and buswork, control boards, and other electrical equipment that, through failure, can be the initiating event that may expand the original fault to nearby or associated equipment. Many failures of such equipment were found and documented, although the failure rate of electrical equipment in utilities is historically quite low. Nuclear plants record too few failures to be statistically valid, but failures that have been recorded show that good design usually restricts the failure to a single piece of equipment. Conclusions and recommendations pertaining to the design, maintenance, and operation of the affected electrical equipment are presented

  13. The Component And System Reliability Analysis Of Multipurpose Reactor G.A. Subway's Based On The Failure Rate Curve

    International Nuclear Information System (INIS)

    Sriyono; Ismu Wahyono, Puradwi; Mulyanto, Dwijo; Kusmono, Siamet

    2001-01-01

    The main component of Multipurpose G.A.Siwabessy had been analyzed by its failure rate curve. The main component ha'..e been analyzed namely, the pump of ''Fuel Storage Pool Purification System'' (AK-AP), ''Primary Cooling System'' (JE01-AP), ''Primary Pool Purification System'' (KBE01-AP), ''Warm Layer System'' (KBE02-AP), ''Cooling Tower'' (PA/D-AH), ''Secondary Cooling System'', and Diesel (BRV). The Failure Rate Curve is made by component database that was taken from 'log book' operation of RSG GAS. The total operation of that curve is 2500 hours. From that curve it concluded that the failure rate of components form of bathtub curve. The maintenance processing causes the curve anomaly

  14. China's coal-fired power plants impose pressure on water resources

    NARCIS (Netherlands)

    Zhang, Xinxin; Liu, Junguo; Tang, Yu; Zhao, Xu; Yang, Hong; Gerbens-Leenes, P.W.; Vliet, van Michelle T.H.; Yan, Jinyue

    2017-01-01

    Coal is the dominant fuel for electricity generation around the world. This type of electricity generation uses large amounts of water, increasing pressure on water resources. This calls for an in-depth investigation in the water-energy nexus of coal-fired electricity generation. In China,

  15. Developing an international consortium to build an 800 MW coal fired power plant in Indonesia

    International Nuclear Information System (INIS)

    Jones, R.H.; Hashima, T.

    1990-01-01

    This paper describes the cooperative construction of a fossil-fueled power plant in Indonesia. The topics discussed in the paper include energy use and the market for electric power, fuel resources, history of business activities, the role of joint resources and government business policy, and preparing for bidding an 800MW coal-fired power plant

  16. Study on a quantitative evaluation method of equipment maintenance level and plant safety level for giant complex plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki

    2010-01-01

    In this study, a quantitative method on maintenance level which is determined by the two factors, maintenance plan and field work implementation ability by maintenance crew is discussed. And also a quantitative evaluation method on safety level for giant complex plant system is discussed. As a result of consideration, the following results were obtained. (1) It was considered that equipment condition after maintenance work was determined by the two factors, maintenance plan and field work implementation ability possessed by maintenance crew. The equipment condition determined by the two factors was named as 'equipment maintenance level' and its quantitative evaluation method was clarified. (2) It was considered that CDF in a nuclear power plant, evaluated by using a failure rate counting the above maintenance level was quite different from CDF evaluated by using existing failure rates including a safety margin. Then, the former CDF was named as 'plant safety level' of plant system and its quantitative evaluation method was clarified. (3) Enhancing equipment maintenance level means an improvement of maintenance quality. That results in the enhancement of plant safety level. Therefore, plant safety level should be always watched as a plant performance indicator. (author)

  17. Investigation into Cause of High Temperature Failure of Boiler Superheater Tube

    Science.gov (United States)

    Ghosh, D.; Ray, S.; Roy, H.; Shukla, A. K.

    2015-04-01

    The failure of the boiler tubes occur due to various reasons like creep, fatigue, corrosion and erosion. This paper highlights a case study of typical premature failure of a final superheater tube of 210 MW thermal power plant boiler. Visual examination, dimensional measurement, chemical analysis, oxide scale thickness measurement, microstructural examination are conducted as part of the investigations. Apart from these investigations, sulfur print, Energy Dispersive spectroscopy (EDS) and X ray diffraction analysis (XRD) are also conducted to ascertain the probable cause of failure of final super heater tube. Finally it has been concluded that the premature failure of the super heater tube can be attributed to the combination of localized high tube metal temperature and loss of metal from the outer surface due to high temperature corrosion. The corrective actions have also been suggested to avoid this type of failure in near future.

  18. On changing points of mean residual life and failure rate function for some generalized Weibull distributions

    International Nuclear Information System (INIS)

    Xie, M.; Goh, T.N.; Tang, Y.

    2004-01-01

    The failure rate function and mean residual life function are two important characteristics in reliability analysis. Although many papers have studied distributions with bathtub-shaped failure rate and their properties, few have focused on the underlying associations between the mean residual life and failure rate function of these distributions, especially with respect to their changing points. It is known that the change point for mean residual life can be much earlier than that of failure rate function. In fact, the failure rate function should be flat for a long period of time for a distribution to be useful in practice. When the difference between the change points is large, the flat portion tends to be longer. This paper investigates the change points and focuses on the difference of the changing points. The exponentiated Weibull, a modified Weibull, and an extended Weibull distribution, all with bathtub-shaped failure rate function will be used. Some other issues related to the flatness of the bathtub curve are discussed

  19. Techno-economic analysis of oxy-combustion coal-fired power plant with cryogenic oxygen storage

    OpenAIRE

    Hanak, Dawid Piotr; Manovic, Vasilije

    2017-01-01

    Around 43% of the cumulative CO2 emissions from the power sector between 2012 and 2050 could be mitigated through implementation of carbon capture and storage, and utilisation of renewable energy sources. Energy storage technologies can increase the efficiency of energy utilisation and thus should be widely deployed along with low-emission technologies. This study evaluates the techno-economic performance of cryogenic O2 storage implemented in an oxy-combustion coal-fired power plant as a mea...

  20. Failure diagnosis aiding device for plant equipment

    International Nuclear Information System (INIS)

    Uhara, Yoshihiko.

    1990-01-01

    The present invention intends to improve the efficiency of trouble shooting for equipments of industrial plants such as nuclear power plants. The device of the present invention comprises an intelligence base and an inference mechanism base. The intelligence base comprises a rule base, an information storing section having a part frame and a working frame and a user's frame. The parts frame contains the failure rate on every parts and data on related operations. The working frame contains the importance and frequency of working. The user's frame contains parameters showing the extent of user's skills. The rule base, the parts frame and the working frame can be selected in accordance with the extent of the user's skill in the inference mechanism. With such a constitution, failures can be checked with the intelligence base in accordance with the knowledges for the failures of the equipments and the extent of user's skill by way of the inference mechanism. (I.S.)