WorldWideScience

Sample records for river system operation

  1. Operation of river systems. The Otra river

    International Nuclear Information System (INIS)

    Harby, A.; Vaskinn, K.A.; Wathne, M.; Heggenes, J.; Saltveit, S.J.

    1993-12-01

    The purpose of the project described in this report was to prepare an operative tool for making decisions about the operation of the power system on the river Otra (Norway) with regard to how this operation might affect the various users of the river system. Above all this affects fish, outdoor life and esthetic values. The connection between water quality and volume of discharge has been examined in a sub project. How suitable parts of the river are as habitats for trout has been simulated on a computer. From field investigation it is concluded that near the Steinfoss power station the physical conditions for trout depend on the operation of the river system. Outdoor life is not much affected downstream Vikeland. 11 refs., 22 figs., 2 tabs

  2. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  3. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930's, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D'Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation

  4. Columbia River System Operation Review final environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System Operation Review (SOR) is being conducted jointly by the US Army Corps of Engineers, the Bureau of Reclamation, and the Bonneville Power Administration. This summary of the SOR story begins where the Draft EIS summary left off. It is divided into seven parts, each of which reports some aspect of the study's outcome: Part 1 is a history. The SOR was not a simple study on any level, and to understand the EIS alternatives, some background is necessary. Part 2 reports the major findings of the technical analysis of alternative system operating strategies, and presents the agencies' Preferred Alternative. Part 3 explains actions the agencies may take with respect to the Columbia River Regional Forum, the Pacific Northwest Coordination Agreement, and the Canadian Entitlement Allocation Agreements. Part 4 presents the Purpose and Need, elements at the core of any Federal EIS. It includes a map showing the Columbia River Basin and information on the affected Federal projects. Part 5 describes the substantial public participation and outreach that occurred during the SOR, and Part 6 summarizes efforts to incorporate the Tribal perspective into the study. Part 7 describes other activities that will be taking place in the next few years, which are related to and build upon the SOR

  5. Columbia River System Operation Review final environmental impact statement. Appendix E: Flood control

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Corps of Engineers, Bonneville Power Administration, and Bureau of Reclamation conducted a scoping process consisting of a series of regionwide public meetings and solicitation of written comments in the summer of 1990. Comments on flood control issues were received from all parts of the Columbia river basin. This appendix includes issues raised in the public scoping process, as well as those brought for consideration by members of the Flood Control Work Group

  6. Columbia River System Operation Review final environmental impact statement. Appendix M: Water quality

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. Analysis of water quality begins with an account of the planning and evaluation process, and continues with a description of existing water quality conditions in the Columbia River Basin. This is followed by an explanation how the analysis was conducted. The analysis concludes with an assessment of the effects of SOR alternatives on water quality and a comparison of alternatives

  7. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings

  8. Columbia River System Operation Review final environmental impact statement. Appendix L: Soils, geology and groundwater

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix addresses the study of geology, soils, and groundwater concerns relative to the System Operation Review (SOR). Chapter 1 provides an overview of the study, scope, and process for this resource area. In order, the respective sections of this chapter discuss the relevant issues for the study, and the means by which the SOR team carried out the study

  9. Columbia River System Operation Review final environmental impact statement. Appendix G: Land use and development

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. The SOR began in early 1990, prior to the filing of petitions for endangered status for several salmon species under the Endangered Species Act. The comprehensive review of Columbia River operations encompassed by the SOR was prompted by the need for Federal decisions to (1) develop a coordinated system operating strategy (SOS) for managing the multiple uses of the system into the 21st century; (2) provide interested parties with a continuing and increased long-term role in system planning (Columbia River Regional Forum); (3) renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA), a contractual arrangement among the region's major hydroelectric-generating utilities and affected Federal agencies to provide for coordinated power generation on the Columbia River system; and (4) renew or develop new Canadian Entitlement Allocation Agreements. The review provides the environmental analysis required by the National Environmental Policy Act (NEPA). This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR

  10. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    Since the 1930's, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M ampersand I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M ampersand I studies; Irrigation/M ampersand I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M ampersand I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement

  11. Columbia River System Operation Review final environmental impact statement. Appendix P: Canadian Entitlement Allocation Agreements (CEAA)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The purpose of this technical appendix is to provide the environmental review necessary to enter into agreements regarding the distribution between Federal and non-Federal project owners with respect to delivery of the Canadian Entitlement obligation to Canada for the period 1998 through 2024

  12. Columbia River System Operation Review final environmental impact statement. Appendix T: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix documents the public and agency review of the SOR Draft EIS and how the SOR agencies used the review to formulate the FINAL EIS. The appendix includes a summary of the review process, a discussion of the nature of the comments, a list of all commentors, reproductions of comment letters, and responses to all comments. Changes in the EIS text in response to comments are noted in the responses

  13. Columbia River System Operation Review final environmental impact statement. Appendix I: Power

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix discusses the work performed by the SOR Power Work Group. The Power Work Group (PWG) had several major responsibilities: first, to determine the effects of each of the various system operating strategies (SOS) on the Northwest regional power system; second, given these effects, to determine what, if any, actions are required to meet forecasted regional energy consumption; and finally, to estimate the cost for serving the forecasted regional energy consumption. The Northwest regional power system consists of Federal and non-Federal hydroelectric power projects (hydropower or hydro projects) on the main stem of the Columbia and Snake Rivers, numerous smaller hydro projects on other river reaches, and a number of thermal plants (coal, nuclear and combustion turbines)

  14. Columbia River System Operation Review final environmental impact statement. Appendix K: Resident fish

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. In this appendix the Resident Fish Work Group (RFWG) has attempted to characterize and evaluate impacts of dam operation on an extremely complex and diverse integrated resource. Not only is this required under the National Environmental Policy Act (NEPA) for SOR, there are resident fish populations that have status under the Federal Endangered Species Act (ESA) or equivalent state regulations (Kootenai River white sturgeon, Snake River white sturgeon, sandroller, shorthead and torrent sculpins, bull trout, westslope cutthroat trout, redband trout, and burbot). The RFWG has also attempted to develop operating alternatives that benefit not only resident fish, but anadromous fish, wildlife, and other human interests as well. The authors have recognized the co-evolution of resident fish, anadromous fish, and other integrated resources in the basin

  15. Columbia River System Operation Review final environmental impact statement. Appendix H: Navigation

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Navigation Technical Appendix presents the analysis of the various SOR alternatives in terms of their potential affects on the congressionally authorized navigation system within the Columbia and Snake river waterways. The focus of the study, impacts to the authorized navigation, improvements/developments, reflects on one of the continuing historical missions of the US Army Corps of Engineers: to promote safe commercial navigation of the nation's waterways benefiting the development of commerce within the US. The study and evaluation process involved Scoping, Screening and Full Scale Evaluation. During screening two models were developed; one was used to evaluate the effects of the various alternatives on navigation through the Snake River Projects and the other the effects on the Dworshak Pool. Full Scale Analysis was expanded to included a study of effects throughout the system

  16. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  17. Columbia River system operation review: Final environmental impact statement. Appendix N, wildlife

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included

  18. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix O: Economic and Social Impact.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included.

  19. Columbia River system operation review: Final environmental impact statement. Appendix O, economic and social impact

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included

  20. Columbia River System Operation Review final environmental impact statement. Appendix Q: Regional forum

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The SOR is currently developing a System Operating Strategy (SOS) that will guide the physical operations of the Columbia River system. The SOR is also addressing the institutional arrangements that must be in place to make needed changes to the SOS in the future, or make interpretations of the strategy in the light of changing water conditions or river needs. For convenience, this future institutional arrangement is referred to as ''The Columbia River Regional Forum,'' or simply ''the Forum,'' even though the nature of this institution is still to be determined. This appendix and the Final Environmental Impact Statement (EIS) identify the Forum as an administrative process that will not result in impacts to the environment and will not require analysis in a NEPA context. The composition of and procedures followed by a decision making body cannot--in and of themselves--be used to predict a particular decision with definable impacts on the environment. Nevertheless, because of the relationship to the other SOR actions, the SOR lead agencies have prepared this Technical Appendix to provide opportunities for review and comment on the Forum alternatives

  1. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

  2. Operating-procedure system at Savannah River Plant

    International Nuclear Information System (INIS)

    Tope, C.W.

    1981-05-01

    Three types of procedures are widely used at SRP: Du Pont Savannah Operating Logsheet, Du Pont Savannah Operating Procedure, and Plant Manual. This document briefly reviews originating of the procedures, their preparation, control, and indexing

  3. Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1994-02-01

    The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

  4. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes

  5. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  6. Columbia River system operation review: Final environmental impact statement. Main report exhibits

    International Nuclear Information System (INIS)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d' Alene tribe

  7. River Stream-Flow and Zayanderoud Reservoir Operation Modeling Using the Fuzzy Inference System

    Directory of Open Access Journals (Sweden)

    Saeed Jamali

    2007-12-01

    Full Text Available The Zayanderoud basin is located in the central plateau of Iran. As a result of population increase and agricultural and industrial developments, water demand on this basin has increased extensively. Given the importance of reservoir operation in water resource and management studies, the performance of fuzzy inference system (FIS for Zayanderoud reservoir operation is investigated in this paper. The model of operation consists of two parts. In the first part, the seasonal river stream-flow is forecasted using the fuzzy rule-based system. The southern oscillated index, rain, snow, and discharge are inputs of the model and the seasonal river stream-flow its output. In the second part, the operation model is constructed. The amount of releases is first optimized by a nonlinear optimization model and then the rule curves are extracted using the fuzzy inference system. This model operates on an "if-then" principle, where the "if" is a vector of fuzzy permits and "then" is the fuzzy result. The reservoir storage capacity, inflow, demand, and year condition factor are used as permits. Monthly release is taken as the consequence. The Zayanderoud basin is investigated as a case study. Different performance indices such as reliability, resiliency, and vulnerability are calculated. According to results, FIS works more effectively than the traditional reservoir operation methods such as standard operation policy (SOP or linear regression.

  8. Columbia River system operation review: Final environmental impact statement. Main report

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement

  9. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

  10. Columbia River system operation review: Final environmental impact statement. Appendix R, Pacific Northwest Coordination agreement (PNCA)

    International Nuclear Information System (INIS)

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region's non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region's power producers to maximize the power system's reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest's hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement

  11. Optimizing Water Use and Hydropower Production in Operational Reservoir System Scheduling with RiverWare

    Science.gov (United States)

    Magee, T. M.; Zagona, E. A.

    2017-12-01

    Practical operational optimization of multipurpose reservoir systems is challenging for several reasons. Each purpose has its own constraints which may conflict with those of other purposes. While hydropower generation typically provides the bulk of the revenue, it is also among the lowest priority purposes. Each river system has important details that are specific to the location such as hydrology, reservoir storage capacity, physical limitations, bottlenecks, and the continuing evolution of operational policy. In addition, reservoir operations models include discrete, nonlinear, and nonconvex physical processes and if-then operating policies. Typically, the forecast horizon for scheduling needs to be extended far into the future to avoid near term (e.g., a few hours or a day) scheduling decisions that result in undesirable future states; this makes the computational effort much larger than may be expected. Put together, these challenges lead to large and customized mathematical optimization problems which must be solved efficiently to be of practical use. In addition, the solution process must be robust in an operational setting. We discuss a unique modeling approach in RiverWare that meets these challenges in an operational setting. The approach combines a Preemptive Linear Goal Programming optimization model to handle prioritized policies complimented by preprocessing and postprocessing with Rulebased Simulation to improve the solution with regard to nonlinearities, discrete issues, and if-then logic. An interactive policy language with a graphical user interface allows modelers to customize both the optimization and simulation based on the unique aspects of the policy for their system while the routine physical aspect of operations are modeled automatically. The modeler is aided by a set of compiled predefined functions and functions shared by other modelers. We illustrate the success of the approach with examples from daily use at the Tennessee Valley

  12. Development of a Reservoir System Operation Model for Water Sustainability in the Yaqui River Basin

    Science.gov (United States)

    Mounir, A.; Che, D.; Robles-Morua, A.; Kauneckis, D.

    2017-12-01

    The arid state of Sonora, Mexico underwent the Sonora SI project to provide additional water supply to the capital of Hermosillo. The main component of the project involves an interbasin transfer from the Yaqui River Basin (YRB) to the Sonora River Basin via the Independencia aqueduct. This project has generated conflicts over water among different social sectors in the YRB. To improve the management of the Yaqui reservoir system, we developed a daily watershed model. This model allowed us to predict the amount of water available in different regions of the basin. We integrated this simulation to an optimization model which calculates the best water allocation according to water rights established in Mexico's National Water Law. We compared different precipitation forcing scenarios: (1) a network of ground observations from Mexican water agencies during the historical period of 1980-2013, (2) gridded fields from the North America Land Data Assimilation System (NLDAS) at 12 km resolution, and (3) we will be studying a future forecast scenario. The simulation results were compared to historical observations at the three reservoirs existing in the YRB to generate confidence in the simulation tools. Our results are presented in the form of flow duration, reliability and exceedance frequency curves that are commonly used in the water management agencies. Through this effort, we anticipate building confidence among regional stakeholders in utilizing hydrological models in the development of reservoir operation policies.

  13. Columbia River system operation review. Final environmental impact statement. Appendix J, recreation

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts

  14. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  15. Application of hydrometeorological coupled European flood forecasting operational real time system in Yellow River Basin

    Directory of Open Access Journals (Sweden)

    Yi-qi Yan

    2009-12-01

    Full Text Available This study evaluated the application of the European flood forecasting operational real time system (EFFORTS to the Yellow River. An automatic data pre-processing program was developed to provide real-time hydrometeorological data. Various GIS layers were collected and developed to meet the demands of the distributed hydrological model in the EFFORTS. The model parameters were calibrated and validated based on more than ten years of historical hydrometeorological data from the study area. The San-Hua Basin (from the Sanmenxia Reservoir to the Huayuankou Hydrological Station, the most geographically important area of the Yellow River, was chosen as the study area. The analysis indicates that the EFFORTS enhances the work efficiency, extends the flood forecasting lead time, and attains an acceptable level of forecasting accuracy in the San-Hua Basin, with a mean deterministic coefficient at Huayuankou Station, the basin outlet, of 0.90 in calibration and 0.96 in validation. The analysis also shows that the simulation accuracy is better for the southern part than for the northern part of the San-Hua Basin. This implies that, along with the characteristics of the basin and the mechanisms of runoff generation of the hydrological model, the hydrometeorological data play an important role in simulation of hydrological behavior.

  16. Field Operations For The "Intelligent River" Observation System: A Basin-wide Water Quality Observation System In The Savannah River Basin And Platform Supporting Related Diverse Initiatives.

    Science.gov (United States)

    Sutton, A.; Koons, M.; O'Brien-Gayes, P.; Moorer, R.; Hallstrom, J.; Post, C.; Gayes, P. T.

    2017-12-01

    The Intelligent River (IR) initiative is an NSF sponsored study developing new data management technology for a range of basin-scale applications. The technology developed by Florida Atlantic and Clemson University established a network of real-time reporting water quality sondes; from the mountains to the estuary of the Savannah River basin. Coastal Carolina University led the field operations campaign. Ancillary studies, student projects and initiatives benefitted from the associated instrumentation, infrastructure and operational support of the IR program. This provided a vehicle for students to participate in fieldwork across the watershed and pursue individual interests. Student projects included: 1) a Multibeam sonar survey investigating channel morphology in the area of an IR sensor station and 2) field tests of developing techniques for acquiring and assimilating flood velocity data into model systems associated with a separate NSF Rapid award. The multibeam survey within the lower Savannah basin exhibited a range of complexity in bathymetry, bedforms and bottom habitat in the vicinity of one of the water quality stations. The complex morphology and bottom habitat reflect complex flow patterns, localized areas of depositional and erosive tendencies providing a valuable context for considering point-source water quality time series. Micro- Lagrangian drifters developed by ISENSE at Florida Atlantic University, a sled mounted ADCP, and particle tracking from imagery collected by a photogrammetric drone were tested and used to develop methodology for establishing velocity, direction and discharge levels to validate, initialize and assimilate data into advance models systems during future flood events. The prospect of expanding wide scale observing systems can serve as a platform to integrate small and large-scale cooperative studies across disciplines as well as basic and applied research interests. Such initiatives provide opportunities for embedded education

  17. Effects of the Operation of Hungry Horse Dam on the Kokanee Fishery in the Flathead River System, 1983 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.

    1983-11-01

    This study was undertaken to assess the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. This annual report covers the 1982-1983 field season concerning the effects of Hungry Horse operations on kokanee abundance, migration, spawning, egg incubation and fry emergence in the Flathead River system. This report also addresses the expected recovery of the mainstem kokanee population under the flow regime recommended by the Department of Fish, Wildlife and Parks in 1982.

  18. Optimal operation of a multipurpose multireservoir system in the Eastern Nile River Basin

    Directory of Open Access Journals (Sweden)

    Q. Goor

    2010-10-01

    Full Text Available The upper Blue Nile River Basin in Ethiopia is a largely untapped resource despite its huge potential for hydropower generation and irrigated agriculture. Controversies exist as to whether the numerous infrastructural development projects that are on the drawing board in Ethiopia will generate positive or negative externalities downstream in Sudan and Egypt. This study attempts at (1 examining the (re-operation of infrastructures, in particular the proposed reservoirs in Ethiopia and the High Aswan Dam and (2 assessing the economic benefits and costs associated with the storage infrastructures in Ethiopia and their spatial and temporal distribution. To achieve this, a basin-wide integrated hydro-economic model has been developed. The model integrates essential hydrologic, economic and institutional components of the river basin in order to explore both the hydrologic and economic consequences of various policy options and planned infrastructural projects. Unlike most of the deterministic economic-hydrologic models reported in the literature, a stochastic programming formulation has been adopted in order to: (i understand the effect of the hydrologic uncertainty on management decisions, (ii determine allocation policies that naturally hedge against the hydrological risk, and (iii assess the relevant risk indicators. The study reveals that the development of four mega dams in the upper part of the Blue Nile Basin would change the drawdown refill cycle of the High Aswan Dam. Should the operation of the reservoirs be coordinated, they would enable an average annual saving of at least 2.5 billion m3 through reduced evaporation losses from the Lake Nasser. Moreover, the new reservoirs (Karadobi, Beko-Abo, Mandaya and Border in Ethiopia would have significant positive impacts on hydropower generation and irrigation in Ethiopia and Sudan: at the basin scale, the annual energy generation is boosted by 38.5 TWh amongst which 14.2 TWh due to

  19. Operating Experience with Airborne Activity Confinement Systems at the Savannah River Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hinton, J. H.; Temple, J. [Savannah River Plant, E.I. Du Pont De Nemours And Co., Aiken, SC (United States)

    1968-12-15

    Equipment has been installed in the ventilation exhaust system of each reactor building at the Savannah River Plant to collect and confine airborne radioactive particles and halogen vapours that might be released in a reactor accident The equipment is continuously on-line and has been in service five years. The activity collection system in each reactor building consists of four active compartments and one spare. Each compartment contains banks of 20 moisture separators, 32 filters, and 32 beds of activated carbon in series and is designed for 32 000 cfm air flow. The moisture separators, which prevent moisture damage to the filters, are woven Teflon stainless steel mats and are steam cleaned approximately every nine months to remove accumulated oily materials and particles. No moisture separators have required replacement. The filters are pleated glass-asbestos felt, protected against mechanical damage by wire mesh on both filter faces. Upon installation, each new filter is tested with a 0 6-{mu}m dioctyl phthalate aerosol. Any filter with a leak greater than 0.05% is replaced. Service life for filters is approximately 16 months The condition of the moisture separator and filter banks in each compartment is determined weekly by measuring the pressure drop across each bank and the air flow rate through the bank The activated carbon beds in each compartment are for removal of iodine-131. Carbon bed banks are leak-tested with Freon-112 annually and after replacement. After about four years of service, seventeen of the 20 banks tested in 1967 were within the maximum leakage specification of 0.09%. Three banks, with leakage up to 0.16%, were replaced in 1967. Five of the 17 with satisfactory leakage rates were replaced because of corrosion of the enameled or cadmium-plated mild steel frames. Replacement carbon beds now have stainless steel frames. (author)

  20. Multi-objective Operation Chart Optimization for Aquatic Species Habitat Conservation of Cascaded Hydropower System on Yuan River, Southwestern China

    Science.gov (United States)

    Wen, X.; Lei, X.; Fang, G.; Huang, X.

    2017-12-01

    Extensive cascading hydropower exploitation in southwestern China has been the subject of debate and conflict in recent years. Introducing limited ecological curves, a novel approach for derivation of hydropower-ecological joint operation chart of cascaded hydropower system was proposed, aiming to optimize the general hydropower and ecological benefits, and to alleviate the ecological deterioration in specific flood/dry conditions. The physical habitat simulation model is proposed initially to simulate the relationship between streamflow and physical habitat of target fish species and to determine the optimal ecological flow range of representative reach. The ecological—hydropower joint optimization model is established to produce the multi-objective operation chart of cascaded hydropower system. Finally, the limited ecological guiding curves were generated and added into the operation chart. The JS-MDS cascaded hydropower system on the Yuan River in southwestern China is employed as the research area. As the result, the proposed guiding curves could increase the hydropower production amount by 1.72% and 5.99% and optimize ecological conservation degree by 0.27% and 1.13% for JS and MDS Reservoir, respectively. Meanwhile, the ecological deterioration rate also sees a decrease from 6.11% to 1.11% for JS Reservoir and 26.67% to 3.89% for MDS Reservoir.

  1. Operating systems

    CERN Document Server

    Tsichritzis, Dionysios C; Rheinboldt, Werner

    1974-01-01

    Operating Systems deals with the fundamental concepts and principles that govern the behavior of operating systems. Many issues regarding the structure of operating systems, including the problems of managing processes, processors, and memory, are examined. Various aspects of operating systems are also discussed, from input-output and files to security, protection, reliability, design methods, performance evaluation, and implementation methods.Comprised of 10 chapters, this volume begins with an overview of what constitutes an operating system, followed by a discussion on the definition and pr

  2. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Cultural Resources.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes.

  3. Effects of the Operation of Hungry Horse Dam on the Kokanee Fishery in the Flathead River System, 1984 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.

    1984-12-01

    This study assessed the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. This report covers the 1983-84 field season concerning the effects of Hungry Horse operations on kokanee abundance and reproductive success in the upper Flathead River system. This report also addresses the projected recovery of the main stem kokanee run under the flow regime recommended by the Department of Fish, Wildlife and Parks and implemented by the Bureau of Reclamation and Bonneville Power Administration in 1982. An estimated 58,775 kokanee reached spawning grounds in the Flathead River System in 1983. The 1983 spawning run was composed of 92% age III + fish, as compared to an average of 80% from 1972-1983. A total of 6883 kokanee redds were enumerated in the main stem Flathead River in 1983. A total of 2366 man-days of angling pressure was estimated during the 1983 kokanee lure fishery in the Flathead River system. Estimated numbers of fry emigrating from McDonald Creek, the Whitefish River and Brenneman's Slough were 13,100,000, 66,254 and 37,198, yielding egg to fry survival rates of 76%, 10.4% and 19.2%.

  4. Columbia River System Operation Review final environmental impact statement. Appendix S: U.S. Fish and Wildlife Service Coordination Act Report

    International Nuclear Information System (INIS)

    1995-11-01

    This document constitutes the report of the US Fish and Wildlife Service (FWS) relating to the proposed Columbia River System Operation Review (SOR). The SOR proposed alternative consists of a number of specific water management manipulations and new management targets for operating the network of existing Federal Columbia River Power System dams and facilities. This report, therefore, presents a broader, ecosystem planning and management approach for evaluating and resolving those operational and biological uncertainties. Potential mitigation, enhancement and restoration actions associated with the preferred alternative will require an adaptive implementation approach. At the present time and as further changes anticipated in SOR operations occur, the complete, ecosystemwide, synergistic effects of the operation of the current Federal Columbia River Power System cannot be adequately ascertained. However, the initial elements of ecosystem-based remedies are presented in Sections 4 and 5 of this report. These remedies are intended to stimulate action to help conserve distressed fish and wildlife populations, while furthering understanding of the impacts of the SOR preferred alternative on the ecosystem. This Coordination Act Report is the first attempt to integrate fish and wildlife mitigation, enhancement, recovery and restoration needs with the proposed action and the existing Federal Columbia River Power System

  5. Effects of the Operation of Kerr and Hungry Horse Dams on the Kokanee Fishery in the Flathead River System, 1979-1985 Final Research Report.

    Energy Technology Data Exchange (ETDEWEB)

    Clancy, Patrick

    1986-05-01

    This study was undertaken to assess the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. Studies concerning operation of the dam on the Flathead River aquatic biota began in 1979 and continued to 1982 under Bureau of Reclamation funding. These studies resulted in flow recommendations for the aquatic biota in the main stem Flathead River, below the influence of Hungry Horse Dam on the South Fork. Studies concerned specifically with kokanee salmon have continued under Bonneville Power Administration funding since 1982. This completion report covers the entire study period (September 1979 to June 1985). Major results of this study were: (1) development and refinement of methods to assess hydropower impacts on spawning and incubation success of kokanee; (2) development of a model to predict kokanee year class strength from Flathead River flows; and (3) implementation of flows favorable for successful kokanee reproduction. A monitoring program has been developed which will assess the recovery of the kokanee population as it proceeds, and to recommend management strategies to maintain management goals for the kokanee fishery in the river system.

  6. River and Reservoir Operations Model, Truckee River basin, California and Nevada, 1998

    Science.gov (United States)

    Berris, Steven N.; Hess, Glen W.; Bohman, Larry R.

    2001-01-01

    The demand for all uses of water in the Truckee River Basin, California and Nevada, commonly is greater than can be supplied. Storage reservoirs in the system have a maximum effective total capacity equivalent to less than two years of average river flows, so longer-term droughts can result in substantial water-supply shortages for irrigation and municipal users and may stress fish and wildlife ecosystems. Title II of Public Law (P.L.) 101-618, the Truckee?Carson?Pyramid Lake Water Rights Settlement Act of 1990, provides a foundation for negotiating and developing operating criteria, known as the Truckee River Operating Agreement (TROA), to balance interstate and interbasin allocation of water rights among the many interests competing for water from the Truckee River. In addition to TROA, the Truckee River Water Quality Settlement Agreement (WQSA), signed in 1996, provides for acquisition of water rights to resolve water-quality problems during low flows along the Truckee River in Nevada. Efficient execution of many of the planning, management, or environmental assessment requirements of TROA and WQSA will require detailed water-resources data coupled with sound analytical tools. Analytical modeling tools constructed and evaluated with such data could help assess effects of alternative operational scenarios related to reservoir and river operations, water-rights transfers, and changes in irrigation practices. The Truckee?Carson Program of the U.S. Geological Survey, to support U.S. Department of the Interior implementation of P.L. 101-618, is developing a modeling system to support efficient water-resources planning, management, and allocation. The daily operations model documented herein is a part of the modeling system that includes a database management program, a graphical user interface program, and a program with modules that simulate river/reservoir operations and a variety of hydrologic processes. The operations module is capable of simulating lake

  7. Operating Systems

    Indian Academy of Sciences (India)

    areas in which this type is useful are multimedia, virtual reality, and advanced scientific projects such as undersea exploration and planetary rovers. Because of the expanded uses for soft real-time functionality, it is finding its way into most current operating systems, including major versions of Unix and Windows NT OS.

  8. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

  9. Evaluation of an operational water cycle prediction system for the Laurentian Great Lakes and St. Lawrence River

    Science.gov (United States)

    Fortin, Vincent; Durnford, Dorothy; Smith, Gregory; Dyck, Sarah; Martinez, Yosvany; Mackay, Murray; Winter, Barbara

    2017-04-01

    Environment and Climate Change Canada (ECCC) is implementing new numerical guidance products based on fully coupled numerical models to better inform the public as well as specialized users on the current and future state of various components of the water cycle, including stream flow and water levels. Outputs from this new system, named the Water Cycle Prediction System (WCPS), have been available for the Great Lakes and St. Lawrence River watershed since June 2016. WCPS links together ECCC's weather forecasting model, GEM, the 2-D ice model C-ICE, the 3-D lake and ocean model NEMO, and a 2-D hydrological model, WATROUTE. Information concerning the water cycle is passed between the models at intervals varying from a few minutes to one hour. It currently produces two forecasts per day for the next three days of the complete water cycle in the Great Lakes region, the largest freshwater lake system in the world. Products include spatially-varying precipitation, evaporation, river discharge, water level anomalies, surface water temperatures, ice coverage, and surface currents. These new products are of interest to water resources and management authority, flood forecasters, hydroelectricity producers, navigation, environmental disaster managers, search and rescue teams, agriculture, and the general public. This presentation focuses on the evaluation of various elements forecasted by the system, and weighs the advantages and disadvantages of running the system fully coupled.

  10. Evaluating and optimizing the operation of the hydropower system in the Upper Yellow River: A general LINGO-based integrated framework.

    Science.gov (United States)

    Si, Yuan; Li, Xiang; Yin, Dongqin; Liu, Ronghua; Wei, Jiahua; Huang, Yuefei; Li, Tiejian; Liu, Jiahong; Gu, Shenglong; Wang, Guangqian

    2018-01-01

    The hydropower system in the Upper Yellow River (UYR), one of the largest hydropower bases in China, plays a vital role in the energy structure of the Qinghai Power Grid. Due to management difficulties, there is still considerable room for improvement in the joint operation of this system. This paper presents a general LINGO-based integrated framework to study the operation of the UYR hydropower system. The framework is easy to use for operators with little experience in mathematical modeling, takes full advantage of LINGO's capabilities (such as its solving capacity and multi-threading ability), and packs its three layers (the user layer, the coordination layer, and the base layer) together into an integrated solution that is robust and efficient and represents an effective tool for data/scenario management and analysis. The framework is general and can be easily transferred to other hydropower systems with minimal effort, and it can be extended as the base layer is enriched. The multi-objective model that represents the trade-off between power quantity (i.e., maximum energy production) and power reliability (i.e., firm output) of hydropower operation has been formulated. With equivalent transformations, the optimization problem can be solved by the nonlinear programming (NLP) solvers embedded in the LINGO software, such as the General Solver, the Multi-start Solver, and the Global Solver. Both simulation and optimization are performed to verify the model's accuracy and to evaluate the operation of the UYR hydropower system. A total of 13 hydropower plants currently in operation are involved, including two pivotal storage reservoirs on the Yellow River, which are the Longyangxia Reservoir and the Liujiaxia Reservoir. Historical hydrological data from multiple years (2000-2010) are provided as input to the model for analysis. The results are as follows. 1) Assuming that the reservoirs are all in operation (in fact, some reservoirs were not operational or did not

  11. The Columbia River System : the Inside Story.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

  12. 78 FR 15878 - Drawbridge Operation Regulations; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2013-03-13

    ... Operation Regulations; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Tower Drawbridge across Sacramento River, mile 59.0, at Sacramento, CA... temporary change to the operation of the Tower Drawbridge, mile 59.0, over Sacramento River, at Sacramento...

  13. Developing computer systems to support emergency operations: Standardization efforts by the Department of Energy and implementation at the DOE Savannah River Site

    International Nuclear Information System (INIS)

    DeBusk, R.E.; Fulton, G.J.; O'Dell, J.J.

    1990-01-01

    This paper describes the development of standards for emergency operations computer systems for the US Department of Energy (DOE). The proposed DOE computer standards prescribe the necessary power and simplicity to meet the expanding needs of emergency managers. Standards include networked UNIX workstations based on the client server model and software that presents information graphically using icons and windowing technology. DOE standards are based on those of the computer industry although Proposed DOE is implementing the latest technology to ensure a solid base for future growth. A case of how these proposed standards are being implemented is also presented. The Savannah River Site (SRS), a DOE facility near Aiken, South Carolina is automating a manual information system, proven over years of development. This system is generalized as a model that can apply to most, if not all, Emergency Operations Centers. This model can provide timely and validated information to emergency managers. By automating this proven system, the system is made easier to use. As experience in the case study demonstrates, computers are only an effective information tool when used as part of a proven process

  14. 77 FR 52599 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-08-30

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... regulation that governs the Tower Drawbridge across Sacramento River, mile 59.0, at Sacramento, CA. The... change to the operation of the Tower Drawbridge, mile 59.0, over Sacramento River, at Sacramento, CA. The...

  15. 78 FR 23489 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2013-04-19

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation... operating regulation that governs the Tower Drawbridge across Sacramento River, mile 59.0, at Sacramento, CA... Tower Drawbridge, mile 59.0, over Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation...

  16. 77 FR 63725 - Drawbridge Operation Regulations; Old River, Orwood, CA

    Science.gov (United States)

    2012-10-17

    ... BNSF Middle River drawbridge as an alternative path for navigation. DATES: The temporary deviation... Operation Regulation; Old River, Orwood CA'' in the Federal Register (77 FR 58491). The temporary deviation... Operation Regulations; Old River, Orwood, CA AGENCY: Coast Guard, DHS. ACTION: Notice of cancellation of a...

  17. 76 FR 13312 - Drawbridge Operation Regulations; Fox River, Oshkosh, WI

    Science.gov (United States)

    2011-03-11

    ...-AA09 Drawbridge Operation Regulations; Fox River, Oshkosh, WI AGENCY: Coast Guard, DHS. ACTION: Notice... National Railway Bridge across the Fox River at Mile 55.72 at Oshkosh, Wisconsin. After careful... On December 8, 2010, we published an NPRM entitled Drawbridge Operation Regulation; Fox River...

  18. Savannah River Plant remote environmental monitoring system

    International Nuclear Information System (INIS)

    Schubert, J.F.

    1987-01-01

    The SRP remote environmental monitoring system consists of separations facilities stack monitors, production reactor stack monitors, twelve site perimeter monitors, river and stream monitors, a geostationary operational environmental satellite (GOES) data link, reactor cooling lake thermal monitors, meteorological tower system, Weather Information and Display (WIND) system computer, and the VANTAGE data base management system. The remote environmental monitoring system when fully implemented will provide automatic monitoring of key stack releases and automatic inclusion of these source terms in the emergency response codes

  19. Evaluating and optimizing the operation of the hydropower system in the Upper Yellow River: A general LINGO-based integrated framework

    Science.gov (United States)

    Si, Yuan; Liu, Ronghua; Wei, Jiahua; Huang, Yuefei; Li, Tiejian; Liu, Jiahong; Gu, Shenglong; Wang, Guangqian

    2018-01-01

    The hydropower system in the Upper Yellow River (UYR), one of the largest hydropower bases in China, plays a vital role in the energy structure of the Qinghai Power Grid. Due to management difficulties, there is still considerable room for improvement in the joint operation of this system. This paper presents a general LINGO-based integrated framework to study the operation of the UYR hydropower system. The framework is easy to use for operators with little experience in mathematical modeling, takes full advantage of LINGO’s capabilities (such as its solving capacity and multi-threading ability), and packs its three layers (the user layer, the coordination layer, and the base layer) together into an integrated solution that is robust and efficient and represents an effective tool for data/scenario management and analysis. The framework is general and can be easily transferred to other hydropower systems with minimal effort, and it can be extended as the base layer is enriched. The multi-objective model that represents the trade-off between power quantity (i.e., maximum energy production) and power reliability (i.e., firm output) of hydropower operation has been formulated. With equivalent transformations, the optimization problem can be solved by the nonlinear programming (NLP) solvers embedded in the LINGO software, such as the General Solver, the Multi-start Solver, and the Global Solver. Both simulation and optimization are performed to verify the model’s accuracy and to evaluate the operation of the UYR hydropower system. A total of 13 hydropower plants currently in operation are involved, including two pivotal storage reservoirs on the Yellow River, which are the Longyangxia Reservoir and the Liujiaxia Reservoir. Historical hydrological data from multiple years (2000–2010) are provided as input to the model for analysis. The results are as follows. 1) Assuming that the reservoirs are all in operation (in fact, some reservoirs were not operational or did

  20. Evaluating and optimizing the operation of the hydropower system in the Upper Yellow River: A general LINGO-based integrated framework.

    Directory of Open Access Journals (Sweden)

    Yuan Si

    Full Text Available The hydropower system in the Upper Yellow River (UYR, one of the largest hydropower bases in China, plays a vital role in the energy structure of the Qinghai Power Grid. Due to management difficulties, there is still considerable room for improvement in the joint operation of this system. This paper presents a general LINGO-based integrated framework to study the operation of the UYR hydropower system. The framework is easy to use for operators with little experience in mathematical modeling, takes full advantage of LINGO's capabilities (such as its solving capacity and multi-threading ability, and packs its three layers (the user layer, the coordination layer, and the base layer together into an integrated solution that is robust and efficient and represents an effective tool for data/scenario management and analysis. The framework is general and can be easily transferred to other hydropower systems with minimal effort, and it can be extended as the base layer is enriched. The multi-objective model that represents the trade-off between power quantity (i.e., maximum energy production and power reliability (i.e., firm output of hydropower operation has been formulated. With equivalent transformations, the optimization problem can be solved by the nonlinear programming (NLP solvers embedded in the LINGO software, such as the General Solver, the Multi-start Solver, and the Global Solver. Both simulation and optimization are performed to verify the model's accuracy and to evaluate the operation of the UYR hydropower system. A total of 13 hydropower plants currently in operation are involved, including two pivotal storage reservoirs on the Yellow River, which are the Longyangxia Reservoir and the Liujiaxia Reservoir. Historical hydrological data from multiple years (2000-2010 are provided as input to the model for analysis. The results are as follows. 1 Assuming that the reservoirs are all in operation (in fact, some reservoirs were not operational

  1. Annual Report - Remotely Operated NDE System for Inspection of Hanford's Waste Tank Knuckle Regions and Development of a Small Roving Annulus Inspection Vehicle T-SAFT Scanning Bridge for Savannah River Site Applications

    International Nuclear Information System (INIS)

    Pardini, Allan F.; Crawford, Susan L.; Harris, Robert V.; Samuel, Todd J.; Roberts, Ron A.; Alzheimer, James M.; Gervais, Kevin L.; Maynard, Melody A.; Tucker, Joseph C.

    2002-01-01

    The design, development, and performance testing of a prototype system known as the Remotely Operated Nondestructive Examination (RONDE)system to examine the knuckle region of a Hanford DST have been completed. The design and fabrication of a scanning bridge to support the Savannah River Site utilizing similar technology was also completed

  2. 78 FR 22423 - Drawbridge Operation Regulations; Taunton River, Fall River and Somerset, MA

    Science.gov (United States)

    2013-04-16

    ... Operation Regulations; Taunton River, Fall River and Somerset, MA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulation. SUMMARY: The Coast Guard is issuing a temporary deviation from the regulation governing the operation of the Brightman Street Bridge across the Taunton River...

  3. Yield-reliability analysis and operating rules for run-of-river ...

    African Journals Online (AJOL)

    Efficient operation of water supply systems requires operating rules as decision support tools. ... Simulated runoff was used to derive unregulated river yield at different levels of assurance ... The results show that Nzhelele River can meet domestic and low-flow requirements at 50–80% (1:2-1:5) LAS. ... HOW TO USE AJOL.

  4. 77 FR 22216 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-04-13

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... schedule that governs the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The... River, at Sacramento, CA. The Tower Drawbridge navigation span provides a vertical clearance of 30 feet...

  5. 76 FR 60732 - Drawbridge Operation Regulations; Navesink (Swimming) River, NJ

    Science.gov (United States)

    2011-09-30

    ... Operation Regulations; Navesink (Swimming) River, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... (Swimming) River between Oceanic and Locust Point, New Jersey. The deviation is necessary to facilitate...: The Oceanic Bridge, across the Navesink (Swimming) River, mile 4.5, between Oceanic and Locust Point...

  6. 77 FR 57022 - Drawbridge Operation Regulation; Shark River, Avon, NJ

    Science.gov (United States)

    2012-09-17

    ... Operation Regulation; Shark River, Avon, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... across the Shark River (South Channel), at Avon Township, NJ. This deviation is necessary to facilitate stringer replacement on the Shark River railroad bridge. This temporary deviation will allow the...

  7. 78 FR 77591 - Drawbridge Operation Regulation; Shark River, NJ

    Science.gov (United States)

    2013-12-24

    ... Operation Regulation; Shark River, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from drawbridge... governs the bascule span of the Route 71 Bridge across Shark River (South Channel), mile 0.8, at Belmar... motor seals and instrumentation on the bridge. The Route 71 Bridge across Shark River (South Channel...

  8. 78 FR 3836 - Drawbridge Operation Regulation; Shark River, Avon, NJ

    Science.gov (United States)

    2013-01-17

    ... Operation Regulation; Shark River, Avon, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from... and the railroad bridge, mile 0.9 both of which are across the Shark River (South Channel), at Avon Township, NJ. This deviation is necessary to facilitate machinery replacement on the Shark River railroad...

  9. Effect of the Operation of Kerr and Hungry Horse Dams on the Reproduction Success of Kokanee in the Flathead River System, 1986 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, Will; Clancey, Patrick

    1987-03-01

    The 1985 kokanee spawning run in the Flathead system was the strongest in five years. Escapement to the Flathead River system was 147,000 fish, including 123,000 in McDonald Creek and an estimated 20,000 in the main stem. Enumeration of spawners and redds in the Flathead River was hindered by high fall flows and early freezing in November. The upstream spawning migration from Flathead Lake began in late August. Schools of kokanee were seen six miles above the lake on September 4. We counted 1,156 redds in Flathead Lake, distributed primarily along the southeastern shore. An unusually high proportion (90 percent) of lakeshore spawning occurred in the zone above minimum pool, where egg mortality is very high because of exposure from drawdown. Escapement to the Swan River was 1,350 fish. Four year old (III+) fish comprised 95 percent of the spawning run in the Flathead system. This continues a five-year trend toward dominance of the III+ year class. The age composition of spawners has varied considerably for the past 15 years. The average size of spawning fish was 365 mm, which is identical to the average size of the parent year class in 1981. One of the goals of managing Flathead kokanee is to produce mature fish 300-330 mm in length. In the main stem Flathead River, pre-emergent survival was 80 percent. Survival in McDonald Creek, unaffected by hydroelectric operations, was 83 percent. Sampling showed few hatched alevins, probably due to unusually cold winter temperatures. Egg survival at Blue Bay, a spawning area on Flathead Lake where redds are concentrated below minimum pool, varied in relation to depth and dissolved oxygen concentration in the substrate. Eggs survived 78 days at 2,880 feet where dissolved oxygen was 5.7 mg/l. Eggs survived 35 days at 2,870 feet where dissolved oxygen concentration averaged 2.9 mg/l. Low dissolved oxygen contributed to poor survival to emergence at all elevations in Blue Ray. Experiments in Skidoo Bay confirmed that survival of

  10. 77 FR 10371 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-02-22

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the bridge owner to conduct... change to the operation of the Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The...

  11. 78 FR 15879 - Drawbridge Operation Regulations; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2013-03-13

    ... Operation Regulations; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of... operating regulation that governs the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the First Annual ``Biggest...

  12. Operating System Security

    CERN Document Server

    Jaeger, Trent

    2008-01-01

    Operating systems provide the fundamental mechanisms for securing computer processing. Since the 1960s, operating systems designers have explored how to build "secure" operating systems - operating systems whose mechanisms protect the system against a motivated adversary. Recently, the importance of ensuring such security has become a mainstream issue for all operating systems. In this book, we examine past research that outlines the requirements for a secure operating system and research that implements example systems that aim for such requirements. For system designs that aimed to

  13. Shutdown of the River Water System at the Savannah River Site: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-11-01

    This environmental impact statement (EIS) evaluates alternative approaches to and environmental impacts of shutting down the River Water System at the Savannah River Site (SRS). Five production reactors were operated at the site.to support these facilities, the River Water System was constructed to provide cooling water to pass through heat exchangers to absorb heat from the reactor core in each of the five reactor areas (C, K, L, P, and R). The DOE Savannah River Strategic Plan directs the SRS to find ways to reduce operating costs and to determine what site infrastructure it must maintain and what infrastructure is surplus. The River Water System has been identified as a potential surplus facility. Three alternatives to reduce the River Water System operating costs are evaluated in this EIS. In addition to the No-Action Alternative, which consists of continuing to operate the River Water System, this EIS examines one alternative (the Preferred Alternative) to shut down and maintain the River Water System in a standby condition until DOE determines that a standby condition is no longer necessary, and one alternative to shut down and deactivate the River Water System. The document provides background information and introduces the River Water System at the SRS; sets forth the purpose and need for DOE action; describes the alternatives DOE is considering; describes the environment at the SRS and in the surrounding area potentially affected by the alternatives addressed and provides a detailed assessment of the potential environmental impacts of the alternatives; and identifies regulatory requirements and evaluates their applicability to the alternatives considered

  14. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  15. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  16. The radionuclide migration model in river system

    International Nuclear Information System (INIS)

    Zhukova, O.M.; Shiryaeva, N.M.; Myshkina, M.K.; Shagalova, Eh.D.; Denisova, V.V.; Skurat, V.V.

    2001-01-01

    It was propose the model of radionuclide migration in river system based on principle of the compartmental model at hydraulically stationary and chemically equilibrium conditions of interaction of radionuclides in system water-dredge, water-sediments. Different conditions of radioactive contamination entry in river system were considered. The model was verified on the data of radiation monitoring of Iput' river

  17. 77 FR 44139 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-07-27

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... Sacramento, CA. The deviation is necessary to allow the community to participate in the Fleet Feet Event, Run... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  18. 76 FR 11960 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-03-04

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  19. 76 FR 26181 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-05-06

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the Hope... Drawbridge, mile 59.0, over Sacramento River, at Sacramento, CA. The drawbridge navigation span provides a...

  20. 76 FR 11679 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-03-03

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... the Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation...

  1. 76 FR 23188 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-04-26

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  2. 76 FR 79067 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-12-21

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow community celebration of New Year's... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  3. 76 FR 20843 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-04-14

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... the Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation...

  4. 77 FR 10372 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-02-22

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  5. 75 FR 16006 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2010-03-31

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.4, at Sacramento, CA. The deviation is necessary to allow the bridge owner to make bridge... Sacramento River, at Sacramento, CA. The I Street Drawbridge navigation span provides 109 feet vertical...

  6. 75 FR 30300 - Drawbridge Operation Regulations; Root River, Racine, WI

    Science.gov (United States)

    2010-06-01

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-0414] Drawbridge Operation Regulations; Root River, Racine, WI AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... Bridge at Mile 0.53 over the Root River, at Racine, WI. This deviation will temporarily change the...

  7. Mobile Operating Systems

    OpenAIRE

    Vipin Kamboj; Hitesh Gupta

    2012-01-01

    Mobile phones are used by every people in today’s life. We use mobile phones without knowing the different factors that a mobile used including its technology, operating system, CPU ,RAM etc. Many types of operating system are used by different mobile. Every operating system has their advantage

  8. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  9. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  10. Savannah River Site peer evaluator standards: Operator assessment for restart

    International Nuclear Information System (INIS)

    1990-01-01

    Savannah River Site has implemented a Peer Evaluator program for the assessment of certified Central Control Room Operators, Central Control Room Supervisors and Shift Technical Engineers prior to restart. This program is modeled after the nuclear Regulatory Commission's (NRC's) Examiner Standard, ES-601, for the requalification of licensed operators in the commercial utility industry. It has been tailored to reflect the unique differences between Savannah River production reactors and commercial power reactors

  11. Operational monitoring of turbidity in rivers: how satellites can contribute

    Science.gov (United States)

    Hucke, Dorothee; Hillebrand, Gudrun; Winterscheid, Axel; Kranz, Susanne; Baschek, Björn

    2016-10-01

    developed from an application toolbox to specifically match requirements of operational monitoring tasks and to allow for a better integration into the existing monitoring system. The toolbox demonstrates the benefits of remote sensing by applying the established processing chain to diverse hydrological questions, such as for the investigation of tidal-affected sediment loads or mixing processes at river confluences. This new application will be of great value to assess, evaluate and monitor the status or the change of large-scale sediment processes at the system level. Accordingly, the satellite-derived turbidity data will strongly enhance federal consulting activities and thus ensure a modern river monitoring of Germany's federal water ways.

  12. IDENTIFICATION SYSTEM, TRACKING AND SUPPORT FOR VESSELS ON RIVERS

    Directory of Open Access Journals (Sweden)

    SAMOILESCU Gheorghe

    2015-05-01

    Full Text Available According to the program COMPRIS (Consortium Operational Management Platform River Information Services, AIS (Automatic Identification System, RIS (River Information Services have compiled a reference model based on the perspective of navigation on the river with related information services. This paper presents a tracking and monitoring surveillance system necessary for assistance of each ship sailing in an area of interest. It shows the operating principle of the composition and role of each equipment. Transferring data to traffic monitoring authority is part of this work.

  13. Autonomous Systems and Operations

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Autonomous Systems and Operations (ASO) project will develop an understanding of the impacts of increasing communication time delays on mission operations,...

  14. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  15. Operation auxiliary system (SAO)

    International Nuclear Information System (INIS)

    Lolich, J.; Santome, D.; Drexler, J.

    1990-01-01

    This work presents an auxiliary system for nuclear power plants operation (SAO). The development purpose consisted in a computing supervision system to be installed at different sites of a reactor, mainly in the control room. The inclusion of this system to a nuclear power plant minimizes the possibility of human error for the facility operation. (Author) [es

  16. Network operating system

    Science.gov (United States)

    1985-01-01

    Long-term and short-term objectives for the development of a network operating system for the Space Station are stated. The short-term objective is to develop a prototype network operating system for a 100 megabit/second fiber optic data bus. The long-term objective is to establish guidelines for writing a detailed specification for a Space Station network operating system. Major milestones are noted. Information is given in outline form.

  17. Balancing hydropower production and river bed incision in operating a run-of-river hydropower scheme along the River Po

    Science.gov (United States)

    Denaro, Simona; Dinh, Quang; Bizzi, Simone; Bernardi, Dario; Pavan, Sara; Castelletti, Andrea; Schippa, Leonardo; Soncini-Sessa, Rodolfo

    2013-04-01

    Water management through dams and reservoirs is worldwide necessary to support key human-related activities ranging from hydropower production to water allocation, and flood risk mitigation. Reservoir operations are commonly planned in order to maximize these objectives. However reservoirs strongly influence river geomorphic processes causing sediment deficit downstream, altering the flow regime, leading, often, to process of river bed incision: for instance the variations of river cross sections over few years can notably affect hydropower production, flood mitigation, water supply strategies and eco-hydrological processes of the freshwater ecosystem. The river Po (a major Italian river) has experienced severe bed incision in the last decades. For this reason infrastructure stability has been negatively affected, and capacity to derive water decreased, navigation, fishing and tourism are suffering economic damages, not to mention the impact on the environment. Our case study analyzes the management of Isola Serafini hydropower plant located on the main Po river course. The plant has a major impact to the geomorphic river processes downstream, affecting sediment supply, connectivity (stopping sediment upstream the dam) and transport capacity (altering the flow regime). Current operation policy aims at maximizing hydropower production neglecting the effects in term of geomorphic processes. A new improved policy should also consider controlling downstream river bed incision. The aim of this research is to find suitable modeling framework to identify an operating policy for Isola Serafini reservoir able to provide an optimal trade-off between these two conflicting objectives: hydropower production and river bed incision downstream. A multi-objective simulation-based optimization framework is adopted. The operating policy is parameterized as a piecewise linear function and the parameters optimized using an interactive response surface approach. Global and local

  18. Operating system MINIX

    OpenAIRE

    JIRKŮ, Radek

    2012-01-01

    This thesis introduces readers to the MINIX operating system, which was used in the creation of the Linux OS. It discusses the history and development of the system and explains its core and the file system. Also solves MINIX installation and configuration of the virtual machine at each step and deals with disputes that had a creator of Minix creator of Linux. In conclusion, compared with Linux MINIX and summarizes the advantages and disadvantages and the use of the operating system at present.

  19. 77 FR 44525 - Drawbridge Operation Regulation; Apalachicola River, FL

    Science.gov (United States)

    2012-07-30

    ... out of service and has an embargo to cease train operations for Port St. Joe and north of the Apalachicola River due to the absence of shipments coming in/out of Port St. Joe. While the embargo remains in... applied for and received an embargo for the suspension of train traffic on the line, the operation of the...

  20. Modern operating systems

    CERN Document Server

    Tanenbaum, Andrew S

    2015-01-01

    Modern Operating Systems, Fourth Edition, is intended for introductory courses in Operating Systems in Computer Science, Computer Engineering, and Electrical Engineering programs. It also serves as a useful reference for OS professionals ' The widely anticipated revision of this worldwide best-seller incorporates the latest developments in operating systems (OS) technologies. The Fourth Edition includes up-to-date materials on relevant'OS. Tanenbaum also provides information on current research based on his experience as an operating systems researcher. ' Modern Operating Systems, Third Editionwas the recipient of the 2010 McGuffey Longevity Award. The McGuffey Longevity Award recognizes textbooks whose excellence has been demonstrated over time.'http://taaonline.net/index.html " Teaching and Learning Experience This program will provide a better teaching and learning experience-for you and your students. It will help: ' *Provide Practical Detail on the Big Picture Concepts: A clear and entertaining writing s...

  1. Emergency operation determination system

    International Nuclear Information System (INIS)

    Miki, Tetsushi.

    1993-01-01

    The system of the present invention can determine an emergency operation coping with abnormal events occurring during nuclear plant operation without replying on an operator's judgement. That is, the system of the present invention comprises an intelligence base which divides and classifies the aims of the plant operation for the function, structure and operation manual and puts them into network. Degree of attainment for the extend of the status normality is determined on every aim of operation based on various kinds of measured data during plant operation. For a degree of attainment within a predetermined range, it is judged that an emergency operation is possible although this is in an abnormal state. Degree of emergency is determined by a fuzzy theory based on the degree of attainment, variation coefficient for the degree of attainment and the sensitivity to external disturbance as parameters. Priority for the degree of emergency on every operation aims is determined by comparison. Normality is successively checked for the determined operation aims. As a result, equipments as objects of abnormality suppressing operation are specified, and the operation amount of the equipments as objects are determined so that the measuring data are within a predetermined range. (I.S.)

  2. Microkernel operating systems

    OpenAIRE

    Rudić, Ratko

    2016-01-01

    This thesis outlines history, development and design of microkernel based operating systems. While the idea of microkernel based architecture emerged early in computer science, there are still very few systems adopting this technology. Microkernel operating systems are divided into several different groups and families that frequently share rules, design decisions and development processes. This master thesis focuses on the main representatives of these groups as well as their mutual...

  3. Computer system operation

    International Nuclear Information System (INIS)

    Lee, Young Jae; Lee, Hae Cho; Lee, Ho Yeun; Kim, Young Taek; Lee, Sung Kyu; Park, Jeong Suk; Nam, Ji Wha; Kim, Soon Kon; Yang, Sung Un; Sohn, Jae Min; Moon, Soon Sung; Park, Bong Sik; Lee, Byung Heon; Park, Sun Hee; Kim, Jin Hee; Hwang, Hyeoi Sun; Lee, Hee Ja; Hwang, In A.

    1993-12-01

    The report described the operation and the trouble shooting of main computer and KAERINet. The results of the project are as follows; 1. The operation and trouble shooting of the main computer system. (Cyber 170-875, Cyber 960-31, VAX 6320, VAX 11/780). 2. The operation and trouble shooting of the KAERINet. (PC to host connection, host to host connection, file transfer, electronic-mail, X.25, CATV etc.). 3. The development of applications -Electronic Document Approval and Delivery System, Installation the ORACLE Utility Program. 22 tabs., 12 figs. (Author) .new

  4. Computer system operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Young Jae; Lee, Hae Cho; Lee, Ho Yeun; Kim, Young Taek; Lee, Sung Kyu; Park, Jeong Suk; Nam, Ji Wha; Kim, Soon Kon; Yang, Sung Un; Sohn, Jae Min; Moon, Soon Sung; Park, Bong Sik; Lee, Byung Heon; Park, Sun Hee; Kim, Jin Hee; Hwang, Hyeoi Sun; Lee, Hee Ja; Hwang, In A [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    The report described the operation and the trouble shooting of main computer and KAERINet. The results of the project are as follows; 1. The operation and trouble shooting of the main computer system. (Cyber 170-875, Cyber 960-31, VAX 6320, VAX 11/780). 2. The operation and trouble shooting of the KAERINet. (PC to host connection, host to host connection, file transfer, electronic-mail, X.25, CATV etc.). 3. The development of applications -Electronic Document Approval and Delivery System, Installation the ORACLE Utility Program. 22 tabs., 12 figs. (Author) .new.

  5. 78 FR 21839 - Drawbridge Operation Regulation; Green River, Small-house, KY and Black River, Jonesboro, LA

    Science.gov (United States)

    2013-04-12

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2013-0041] RIN 1625-AA09 Drawbridge Operation Regulation; Green River, Small-house, KY and Black River, Jonesboro, LA... drawbridge operation regulation for the drawbridges across Green River, mile 79.6, Small- house, KY and Black...

  6. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  7. Distributed Operating Systems

    NARCIS (Netherlands)

    Mullender, Sape J.

    1987-01-01

    In the past five years, distributed operating systems research has gone through a consolidation phase. On a large number of design issues there is now considerable consensus between different research groups. In this paper, an overview of recent research in distributed systems is given. In turn, the

  8. 78 FR 42452 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2013-07-16

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation... Sacramento, CA. The deviation is necessary to allow the bridge owner to make bridge repairs. This deviation... Sacramento, CA. The drawbridge navigation span provides 109 feet vertical clearance above Mean High Water in...

  9. 75 FR 38712 - Drawbridge Operation Regulation; Shrewsbury River, NJ

    Science.gov (United States)

    2010-07-06

    ... 4.0, across the Shrewsbury River at Sea Bright, New Jersey, shall operate as follows: (a) The draw..., and holidays, between 9 a.m. and 7 p.m., the draw need open only on the hour and half hour. (b) The...

  10. 78 FR 5156 - Drawbridge Operation Regulation; Christina River, Wilmington, DE

    Science.gov (United States)

    2013-01-24

    ... both of the bridges to open on signal, and that the Market Street drawbridge at mile 3.0, open on... Drawbridge Operation Regulation; Christina River, Wilmington, DE AGENCY: Coast Guard, DHS. ACTION: Notice of... Third Street Bridge at mile 2.3, the Walnut Street Bridge at mile 2.8, and the Market Street Bridge at...

  11. 76 FR 13288 - Drawbridge Operation Regulations; Hackensack River, Secaucus, NJ

    Science.gov (United States)

    2011-03-11

    ... deviation from the regulation governing the operation of the Upper Hack Bridge at mile 6.9, across the...: The Upper Hack Bridge, across the Hackensack River at mile 6.9 has a vertical clearance in the closed... rehabilitation at the bridge. Under this temporary deviation the Upper Hack Bridge, mile 6.9, across the...

  12. 77 FR 3607 - Drawbridge Operation Regulation; Willamette River, Portland, OR

    Science.gov (United States)

    2012-01-25

    ... deviation from the regulation governing the operation of the Burlington Northern Santa Fe Railway Bridge... Northern Santa Fe (BNSF) Railway has requested to not open the BNSF Railroad Lift Bridge for vessels to... deviation allows the lift span of the BNSF Railway Bridge across the Willamette River, mile 6.9, to remain...

  13. 78 FR 15293 - Drawbridge Operation Regulations; Columbia River, Vancouver, WA

    Science.gov (United States)

    2013-03-11

    ... operating schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Bridge across the Columbia... replacement of movable bridge joints. During these maintenance periods the swing span of the BNSF Railway... allows the swing span of the BNSF Railway Bridge across the Columbia River, mile 105.6, to remain in the...

  14. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  15. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  16. 77 FR 75917 - Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT

    Science.gov (United States)

    2012-12-26

    ...-AA09 Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT AGENCY: Coast..., mile 1.3, across the Quinnipiac River, and the Chapel Street Bridge, mile 0.4, across the Mill River..., across the Quinnipiac River, and the Chapel Street Bridge, mile 0.4, across the Mill River, to reduce the...

  17. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  18. The Columbia River System Inside Story

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-04-01

    The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwest—from fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the region’s electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

  19. Disc operational system

    International Nuclear Information System (INIS)

    Veretenov, V.Yu.; Volkov, A.I.; Gurevich, M.I.; Kozik, V.S.; Pod'yachev, E.I.; Shapiro, M.L.

    1974-01-01

    A disc operational system is proposed, which is based on the file structure and designed for use in a BESM-6 computer with the software system comprising a dispatcher DD-73 and a monitor 'Dubna'. The main distinguishing feature of the disc operational system is the decentralization of the file system. Each disc package is an independent file unaffected by the state of the other disc packages. The use of several disc packages is allowed. The above feature of the disc operational system makes it possible to simplify the language of communication with the system, to give the user the opportunity of controlling the file quite independently, and to simplify the maintenance of the discs by the computer personnel. One and the same disc can be simultaneously addressed by all problems in the processor (both mathematical and service). A single file, however, may be used in the recording mode by only one problem. The description presented is the instruction for users. It also describes special possibilities open to the system programmers [ru

  20. Future concepts of pyrometallurgical operations at the Savannah River Plant

    International Nuclear Information System (INIS)

    Gray, L.W.; Orth, D.A.; Augsburger, S.T.

    1986-01-01

    For more than three decades, the Savannah River Plant has used the principles of extractive metallurgy for the winning of plutonium from irradiated reactor targets, reactor fuels, and unirradiated scrap and residues. Realizing that at some time in the future the aging facilities at SRP will come to the end of their useful life, the Savannah River Laboratory is assessing the permutations of the various hydro-, pyro-, and electrometallurgy unit operations that could be combined to yield a complete process. Preliminary evaluation suggests that a combination of cation exchange, oxalate precipitation, calcination, hydrofluorination, and calcium reduction would be a reasonable combination of unit operations for Savannah River to use. Several different combinations of process steps offer about the same space requirements when all recycle loops for a complete process are included; each of these unit operations has an adequate technical basis. No single process route appears to offer unique opportunities for technological improvements that can reduce capital and operating costs below those of the suggested route. A group of other alternatives might be promoted to the favored group following sufficient technical development. Research plans are being formulated to determine which, if any, of the alternatives should be promoted to the favored group

  1. Startup and operation of a plant-scale continuous glass melter for vitrification of Savannah River Plant simulated waste

    International Nuclear Information System (INIS)

    Willis, T.A.

    1980-01-01

    The reference process for disposal of radioactive waste from the Savannah River Plant is vitrification of the waste in borosilicate glass in a continuous glass melter. Design, startup, and operation of a plant-scale developmental melter system are discussed

  2. Effects of Coordinated Operation of Weirs and Reservoirs on the Water Quality of the Geum River

    Directory of Open Access Journals (Sweden)

    Jung Min Ahn

    2017-06-01

    Full Text Available Multifunctional weirs can be used to maintain water supply during dry seasons and to improve downstream water quality during drought conditions through discharge based on retained flux. Sixteen multifunctional weirs were recently constructed in four river systems as part of the Four Rivers Restoration Project. In this study, three multifunctional weirs in the Geum River Basin were investigated to analyze the environmental effects of multifunctional weir operation on downstream flow. To determine seasonal vulnerability to drought, the basin was evaluated using the Palmer Drought Severity Index (PDSI. Furthermore, the downstream flow regime and the effect on water quality improvement of a coordinated dam–multifunctional weir operation controlled by: (a a rainfall–runoff model; (b a reservoir optimization model; and (c a water quality model, were examined. A runoff estimate at each major location in the Geum River Basin was performed using the water quality model, and examined variation in downstream water quality depending on the operational scenario of each irrigation facility such as dams and weirs. Although the water quality was improved by the coordinated operation of the dams and weirs, when the discharged water quality is poor, the downstream water quality is not improved. Therefore, it is necessary to first improve the discharged water quality on the lower Geum River. Improvement of the water quality of main stream in the Geum River is important, but water quality from tributaries should also be improved. By applying the estimated runoff data to the reservoir optimization model, these scenarios will be utilized as basic parameters for assessing the optimal operation of the river.

  3. Operational river discharge forecasting in poorly gauged basins: the Kavango River basin case study

    DEFF Research Database (Denmark)

    Bauer-Gottwein, Peter; Jensen, Iris Hedegaard; Guzinski, R.

    2015-01-01

    in Africa. We present an operational probabilistic forecasting approach which uses public-domain climate forcing data and a hydrologic-hydrodynamic model which is entirely based on open-source software. Data assimilation techniques are used to inform the forecasts with the latest available observations......Operational probabilistic forecasts of river discharge are essential for effective water resources management. Many studies have addressed this topic using different approaches ranging from purely statistical black-box approaches to physically based and distributed modeling schemes employing data...... assimilation techniques. However, few studies have attempted to develop operational probabilistic forecasting approaches for large and poorly gauged river basins. The objective of this study is to develop open-source software tools to support hydrologic forecasting and integrated water resources management...

  4. 78 FR 13479 - Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT

    Science.gov (United States)

    2013-02-28

    ...-AA09 Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT AGENCY: Coast... regulations that govern the operation of three bridges across the Quinnipiac and Mill Rivers at New Haven...) entitled ``Drawbridge Operation Regulations New Haven Harbor, Quinnipiac and Mill Rivers,'' in the Federal...

  5. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  6. Pyrolaser Operating System

    Science.gov (United States)

    Roberts, Floyd E., III

    1994-01-01

    Software provides for control and acquisition of data from optical pyrometer. There are six individual programs in PYROLASER package. Provides quick and easy way to set up, control, and program standard Pyrolaser. Temperature and emisivity measurements either collected as if Pyrolaser in manual operating mode or displayed on real-time strip charts and stored in standard spreadsheet format for posttest analysis. Shell supplied to allow macros, which are test-specific, added to system easily. Written using Labview software for use on Macintosh-series computers running System 6.0.3 or later, Sun Sparc-series computers running Open-Windows 3.0 or MIT's X Window System (X11R4 or X11R5), and IBM PC or compatible computers running Microsoft Windows 3.1 or later.

  7. Advanced Operating System Technologies

    Science.gov (United States)

    Cittolin, Sergio; Riccardi, Fabio; Vascotto, Sandro

    In this paper we describe an R&D effort to define an OS architecture suitable for the requirements of the Data Acquisition and Control of an LHC experiment. Large distributed computing systems are foreseen to be the core part of the DAQ and Control system of the future LHC experiments. Neworks of thousands of processors, handling dataflows of several gigaBytes per second, with very strict timing constraints (microseconds), will become a common experience in the following years. Problems like distributyed scheduling, real-time communication protocols, failure-tolerance, distributed monitoring and debugging will have to be faced. A solid software infrastructure will be required to manage this very complicared environment, and at this moment neither CERN has the necessary expertise to build it, nor any similar commercial implementation exists. Fortunately these problems are not unique to the particle and high energy physics experiments, and the current research work in the distributed systems field, especially in the distributed operating systems area, is trying to address many of the above mentioned issues. The world that we are going to face in the next ten years will be quite different and surely much more interconnected than the one we see now. Very ambitious projects exist, planning to link towns, nations and the world in a single "Data Highway". Teleconferencing, Video on Demend, Distributed Multimedia Applications are just a few examples of the very demanding tasks to which the computer industry is committing itself. This projects are triggering a great research effort in the distributed, real-time micro-kernel based operating systems field and in the software enginering areas. The purpose of our group is to collect the outcame of these different research efforts, and to establish a working environment where the different ideas and techniques can be tested, evaluated and possibly extended, to address the requirements of a DAQ and Control System suitable for LHC

  8. Operating systems. [of computers

    Science.gov (United States)

    Denning, P. J.; Brown, R. L.

    1984-01-01

    A counter operating system creates a hierarchy of levels of abstraction, so that at a given level all details concerning lower levels can be ignored. This hierarchical structure separates functions according to their complexity, characteristic time scale, and level of abstraction. The lowest levels include the system's hardware; concepts associated explicitly with the coordination of multiple tasks appear at intermediate levels, which conduct 'primitive processes'. Software semaphore is the mechanism controlling primitive processes that must be synchronized. At higher levels lie, in rising order, the access to the secondary storage devices of a particular machine, a 'virtual memory' scheme for managing the main and secondary memories, communication between processes by way of a mechanism called a 'pipe', access to external input and output devices, and a hierarchy of directories cataloguing the hardware and software objects to which access must be controlled.

  9. Reliability modeling of Clinch River breeder reactor electrical shutdown systems

    International Nuclear Information System (INIS)

    Schatz, R.A.; Duetsch, K.L.

    1974-01-01

    The initial simulation of the probabilistic properties of the Clinch River Breeder Reactor Plant (CRBRP) electrical shutdown systems is described. A model of the reliability (and availability) of the systems is presented utilizing Success State and continuous-time, discrete state Markov modeling techniques as significant elements of an overall reliability assessment process capable of demonstrating the achievement of program goals. This model is examined for its sensitivity to safe/unsafe failure rates, sybsystem redundant configurations, test and repair intervals, monitoring by reactor operators; and the control exercised over system reliability by design modifications and the selection of system operating characteristics. (U.S.)

  10. L-Reactor operation, Savannah River Plant: environmental assessment

    International Nuclear Information System (INIS)

    1982-08-01

    The purpose of this document is to assess the significance of the effects on the human environment of the proposed resumption of L-reactor operation at the Savannah River Plant, scheduled for October 1983. The discussion is presented under the following section headings: need for resumption of L-Reactor operations and purpose of this environmental assessment; proposed action and alternative; affected environment (including, site location and description, land use, historic and archeological resources, socioeconomic and community characteristics, geology and seismology, hydrology, meteorology and climatology, ecology, and radiation environment); environmental consequences; summary of projected L-Reactor releases and impacts; and Federal and State permits and approval. The three appendices are entitled: radiation dose calculation methods and assumptions; floodplain/wetlands assessment - L-Reactor operations; and, conversion table. A list of references is included at the end of each chapter

  11. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  12. 76 FR 81826 - Drawbridge Operation Regulation; Pocomoke River, Pocomoke City, MD

    Science.gov (United States)

    2011-12-29

    ... Operation Regulation; Pocomoke River, Pocomoke City, MD AGENCY: Coast Guard, DHS. ACTION: Notice of... River, mile 15.6, at Pocomoke City, MD. The deviation restricts the operation of the draw span to... five hours advance notice is given. The Route 675 Bridge across Pocomoke River, mile 15.6 at Pocomoke...

  13. 76 FR 5686 - Drawbridge Operation Regulation; Pocomoke River, Pocomoke City, MD

    Science.gov (United States)

    2011-02-02

    ... Operation Regulation; Pocomoke River, Pocomoke City, MD AGENCY: Coast Guard, DHS. ACTION: Notice of... River, mile 15.6, at Pocomoke City, MD. The deviation restricts the operation of the draw span to.... The Route 675 Bridge across Pocomoke River, mile 15.6 at Pocomoke City MD, has a vertical clearance in...

  14. 77 FR 21864 - Drawbridge Operation Regulation; Saginaw River, Bay City, MI

    Science.gov (United States)

    2012-04-12

    ...-AA09 Drawbridge Operation Regulation; Saginaw River, Bay City, MI AGENCY: Coast Guard, DHS. ACTION... Lafayette Street Bridge at mile 6.78, all over the Saginaw River at Bay City, MI. The previous regulation... Operation Regulation; Saginaw River, Bay City, MI, in the Federal Register (76 FR 76637). We received one...

  15. 75 FR 38411 - Drawbridge Operation Regulations; Charles River, Boston, MA, Public Event

    Science.gov (United States)

    2010-07-02

    ... Operation Regulations; Charles River, Boston, MA, Public Event AGENCY: Coast Guard, DHS. ACTION: Notice of..., telephone 202-366-9826. SUPPLEMENTARY INFORMATION: The Craigie Bridge, across the Charles River at mile 1.0... elevation above the Charles River Dam. The existing drawbridge operation regulations are listed at 33 CFR...

  16. 76 FR 11679 - Drawbridge Operation Regulation; Shark River (South Channel), Belmar, NJ

    Science.gov (United States)

    2011-03-03

    ... Operation Regulation; Shark River (South Channel), Belmar, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... temporary deviation from the regulations governing the operation of the S71 Bridge across Shark River (South... Bridge, a bascule lift drawbridge, across Shark River (South Channel), at mile 0.8, in Belmar, NJ, has a...

  17. 75 FR 1738 - Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT

    Science.gov (United States)

    2010-01-13

    ...-AA09 Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT AGENCY: Coast... regulation governing the operation of three bridges across the Quinnipiac and Mill Rivers at New Haven... and 15 feet at mean low water. The Chapel Street Bridge at mile 0.4, across the Mill River has a...

  18. Flood Forecasting in River System Using ANFIS

    International Nuclear Information System (INIS)

    Ullah, Nazrin; Choudhury, P.

    2010-01-01

    The aim of the present study is to investigate applicability of artificial intelligence techniques such as ANFIS (Adaptive Neuro-Fuzzy Inference System) in forecasting flood flow in a river system. The proposed technique combines the learning ability of neural network with the transparent linguistic representation of fuzzy system. The technique is applied to forecast discharge at a downstream station using flow information at various upstream stations. A total of three years data has been selected for the implementation of this model. ANFIS models with various input structures and membership functions are constructed, trained and tested to evaluate efficiency of the models. Statistical indices such as Root Mean Square Error (RMSE), Correlation Coefficient (CORR) and Coefficient of Efficiency (CE) are used to evaluate performance of the ANFIS models in forecasting river flood. The values of the indices show that ANFIS model can accurately and reliably be used to forecast flood in a river system.

  19. A Computed River Flow-Based Turbine Controller on a Programmable Logic Controller for Run-Off River Hydroelectric Systems

    Directory of Open Access Journals (Sweden)

    Razali Jidin

    2017-10-01

    Full Text Available The main feature of a run-off river hydroelectric system is a small size intake pond that overspills when river flow is more than turbines’ intake. As river flow fluctuates, a large proportion of the potential energy is wasted due to the spillages which can occur when turbines are operated manually. Manual operation is often adopted due to unreliability of water level-based controllers at many remote and unmanned run-off river hydropower plants. In order to overcome these issues, this paper proposes a novel method by developing a controller that derives turbine output set points from computed mass flow rate of rivers that feed the hydroelectric system. The computed flow is derived by summation of pond volume difference with numerical integration of both turbine discharge flows and spillages. This approach of estimating river flow allows the use of existing sensors rather than requiring the installation of new ones. All computations, including the numerical integration, have been realized as ladder logics on a programmable logic controller. The implemented controller manages the dynamic changes in the flow rate of the river better than the old point-level based controller, with the aid of a newly installed water level sensor. The computed mass flow rate of the river also allows the controller to straightforwardly determine the number of turbines to be in service with considerations of turbine efficiencies and auxiliary power conservation.

  20. Laboratory robotics systems at the Savannah River Laboratory

    International Nuclear Information System (INIS)

    Dyches, G.M.; Burkett, S.D.

    1983-01-01

    Many analytical chemistry methods normally used at the Savannah River site require repetitive procedures and handling of radioactive and other hazardous solutions. Robotics is being investigated as a method of reducing personnel fatigue and radiation exposure and also increasing product quality. Several applications of various commercially available robot systems are discussed involving cold (nonradioactive) and hot (radioactive) sample preparations and glovebox waste removal. Problems encountered in robot programming, parts fixturing, design of special robot hands and other support equipment, glovebox operation, and operator-system interaction are discussed. A typical robot system cost analysis for one application is given

  1. Vessel Operator System

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Operator cards are required for any operator of a charter/party boat and or a commercial vessel (including carrier and processor vessels) issued a vessel permit from...

  2. Colorado River Sewer System Joint Venture to Upgrade Wastewater System

    Science.gov (United States)

    SAN FRANCISCO -Today, the Colorado River Sewer System Joint Venture, located in Parker, Ariz. entered into an agreement with the EPA to upgrade their wastewater treatment system to meet stringent water quality standards. The cost of the upgrade is ap

  3. Energy Efficient Mobile Operating Systems

    OpenAIRE

    Muhammad Waseem

    2013-01-01

    Energy is an important resource in mobile computers now days. It is important to manage energy in efficient manner so that energy consumption will be reduced. Developers of operating system decided to increase the battery life time of mobile phones at operating system level. So, design of energy efficient mobile operating system is the best way to reduce the energy consumption in mobile devices. In this paper, currently used energy efficient mobile operating system is discussed and compared. ...

  4. Operational river discharge forecasting in poorly gauged basins: the Kavango River Basin case study

    DEFF Research Database (Denmark)

    Bauer-Gottwein, Peter; Jensen, Iris Hedegaard; Guzinski, R.

    2014-01-01

    to support integrated water resources management in Africa and to facilitate the use of satellite earth observation data in water management. We present an operational probabilistic forecasting approach which uses public-domain climate forcing data and a hydrologic–hydrodynamic model which is entirely based......Operational probabilistic forecasts of river discharge are essential for effective water resources management. Many studies have addressed this topic using different approaches ranging from purely statistical black-box approaches to physically-based and distributed modelling schemes employing data...... on open-source software. Data assimilation techniques are used to inform the forecasts with the latest available observations. Forecasts are produced in real time for lead times of 0 to 7 days. The operational probabilistic forecasts are evaluated using a selection of performance statistics and indicators...

  5. Selective analysis of power plant operation on the Hudson River with emphasis on the Bowline Point Generating Station. Volume 2. [Multiple impact of power plant once-through cooling systems on fish populations

    Energy Technology Data Exchange (ETDEWEB)

    Barnthouse, L. W.; Cannon, J. B.; Christensen, S. G.

    1977-07-01

    Because of the location of the Bowline, Roseton, and Indian Point power generating facilities in the low-salinity zone of the Hudson estuary, operation of these plants with the present once-through cooling systems will adversely influence the fish populations that use the area for spawning and initial periods of growth and development. Recruitment rates and standing crops of several fish species may be lowered in response to the increased mortality caused by entrainment of nonscreenable eggs and larvae and by impingement of screenable young of the year. Entrainment and impingement data are particularly relevant for assessing which fish species have the greatest potential for being adversely affected by operation of Bowline, Roseton, and Indian Point with once-through cooling. These data from each of these three plants suggest that the six species that merit the greatest consideration are striped bass, white perch, tomcod, alewife, blueback herring, and bay anchovy. Two points of view are available for assessing the relative importance of the fish species in the Hudson River. From the fisheries point of view, the only two species of major importance are striped bass and shad. From the fish-community and ecosystem point of view, the dominant species, as determined by seasonal and regional standing crops (in numbers and biomass per hectare), are the six species most commonly entrained and impinged, namely, striped bass, white perch, tomcod, alewife, blueback herring, and anchovy.

  6. High-Performance Operating Systems

    DEFF Research Database (Denmark)

    Sharp, Robin

    1999-01-01

    Notes prepared for the DTU course 49421 "High Performance Operating Systems". The notes deal with quantitative and qualitative techniques for use in the design and evaluation of operating systems in computer systems for which performance is an important parameter, such as real-time applications......, communication systems and multimedia systems....

  7. An intelligent agent for optimal river-reservoir system management

    Science.gov (United States)

    Rieker, Jeffrey D.; Labadie, John W.

    2012-09-01

    A generalized software package is presented for developing an intelligent agent for stochastic optimization of complex river-reservoir system management and operations. Reinforcement learning is an approach to artificial intelligence for developing a decision-making agent that learns the best operational policies without the need for explicit probabilistic models of hydrologic system behavior. The agent learns these strategies experientially in a Markov decision process through observational interaction with the environment and simulation of the river-reservoir system using well-calibrated models. The graphical user interface for the reinforcement learning process controller includes numerous learning method options and dynamic displays for visualizing the adaptive behavior of the agent. As a case study, the generalized reinforcement learning software is applied to developing an intelligent agent for optimal management of water stored in the Truckee river-reservoir system of California and Nevada for the purpose of streamflow augmentation for water quality enhancement. The intelligent agent successfully learns long-term reservoir operational policies that specifically focus on mitigating water temperature extremes during persistent drought periods that jeopardize the survival of threatened and endangered fish species.

  8. RiverHeath: Neighborhood Loop Geothermal Exchange System

    Energy Technology Data Exchange (ETDEWEB)

    Geall, Mark [RiverHeath LLC, Appleton, WI (United States)

    2016-07-11

    The goal of the RiverHeath project is to develop a geothermal exchange system at lower capital infrastructure cost than current geothermal exchange systems. The RiverHeath system features an innovative design that incorporates use of the adjacent river through river-based heat exchange plates. The flowing water provides a tremendous amount of heat transfer. As a result, the installation cost of this geothermal exchange system is lower than more traditional vertical bore systems. Many urban areas are located along rivers and other waterways. RiverHeath will serve as a template for other projects adjacent to the water.

  9. A Multiprocessor Operating System Simulator

    Science.gov (United States)

    Johnston, Gary M.; Campbell, Roy H.

    1988-01-01

    This paper describes a multiprocessor operating system simulator that was developed by the authors in the Fall semester of 1987. The simulator was built in response to the need to provide students with an environment in which to build and test operating system concepts as part of the coursework of a third-year undergraduate operating systems course. Written in C++, the simulator uses the co-routine style task package that is distributed with the AT&T C++ Translator to provide a hierarchy of classes that represents a broad range of operating system software and hardware components. The class hierarchy closely follows that of the 'Choices' family of operating systems for loosely- and tightly-coupled multiprocessors. During an operating system course, these classes are refined and specialized by students in homework assignments to facilitate experimentation with different aspects of operating system design and policy decisions. The current implementation runs on the IBM RT PC under 4.3bsd UNIX.

  10. Hydrologic-agronomic-economic model for the optimal operation of the Yaqui river reservoir system using genetic algorithms; Modelo hidrologico-agronomico-economico para la operacion optima del sistema de presas del rio Yaqui, usando algoritmos geneticos

    Energy Technology Data Exchange (ETDEWEB)

    Minjares-Lugo, Jose Luis; Salmon-Castelo, Roberto Fernando; Oroz-Ramos, Lucas Antonio [Comision Nacional del Agua (Mexico); Cruz-Medina, Isidro Roberto [Instituto Tecnologico de Sonora (Mexico)

    2008-07-15

    The objective of this study is to develop an integrated hydrologic-agronomic-economic annual model for the optimal operation of the Yaqui River reservoir system to support irrigation and urban water supply in the watershed. The model solves for each year's water allocations by crop, maximizing annual agricultural income for a specified risk of reservoir shortages and spills. It accounts for adjustments in water supply arising from changes in precipitation and runoff uncertainty and from changes in water demand arising from variations in crop prices and production costs. Model predictions for the agricultural year 2000-2001 are compared with observed results to test the model's predictive ability. Results demonstrate that the model can be used to optimize and analyze reservoir system operation and for water resources management in the Irrigation District No. 041, providing a framework for improving the operation of a reservoir system, selecting an optimal cropping pattern according to its maximum economic benefits, and in the optimal monthly water releases from the reservoir system. The model considers the simultaneous operation of three dams and it is applied to the Irrigation District No. 041, Rio Yaqui. [Spanish] El objetivo de este estudio es desarrollar un modelo integral de optimizacion anual para definir la operacion del sistema de presas del rio Yaqui y la asignacion del volumen mensual de agua para la irrigacion de diferentes cultivos, asi como para satisfacer los requerimientos de uso urbano basado en las condiciones hidrologicas, agronomicas y economicas en la cuenca. El modelo maximiza los beneficios anuales netos del sector agricola, minimizando el riesgo de deficit o derrames en el sistema de presas; incluye cambios en el suministro de agua debido a la incertidumbre de las precipitaciones y del escurrimiento del rio y cambios en la demanda de agua provocados por la incertidumbre de los precios y costos de los cultivos. Se utilizaron datos del

  11. 76 FR 9224 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2011-02-17

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... Hackensack River, mile 3.4, at Jersey City, New Jersey. The deviation is necessary to repair structural steel... Bridge, across the Hackensack River at mile 3.4, has a vertical clearance in the closed position of 40...

  12. 77 FR 72737 - Drawbridge Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO

    Science.gov (United States)

    2012-12-06

    ... Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO AGENCY: Coast Guard, DHS. ACTION: Notice... River, mile 359.4, at Kansas City, Missouri. The deviation is necessary to allow the replacement of 64... deviation for the Harry S. Truman Railroad Drawbridge, across the Missouri River, mile 359.4, at Kansas City...

  13. 76 FR 3516 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Science.gov (United States)

    2011-01-20

    ... Operation Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., across the Harlem River, New York City, New York. The deviation is necessary to facilitate bridge... River at mile 0.0 has a vertical clearance in the closed position of 55 feet at mean high water and 60...

  14. 76 FR 27250 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2011-05-11

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... Hackensack River, mile 3.4, at Jersey City, New Jersey. The deviation is necessary to repair structural steel... Bridge, across the Hackensack River at mile 3.4, has a vertical clearance in the closed position of 40...

  15. 75 FR 78601 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance

    Science.gov (United States)

    2010-12-16

    ... Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance AGENCY: Coast Guard, DHS. ACTION... 3.1, across the Hackensack River, at Jersey City, New Jersey. Under this temporary deviation a two.... SUPPLEMENTARY INFORMATION: The Witt Penn Bridge, across the Hackensack River at mile 3.1 has a vertical...

  16. 76 FR 40234 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Science.gov (United States)

    2011-07-08

    ...-AA09 Drawbridge Operation Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION... at mile 0.0, across the Harlem River at New York City, New York. This interim rule is necessary to... The 103rd Street (Wards Island) Pedestrian Bridge, across the Harlem River, mile 0.0, at New York City...

  17. 77 FR 24147 - Drawbridge Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO

    Science.gov (United States)

    2012-04-23

    ... Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO AGENCY: Coast Guard, DHS. ACTION: Notice... River, mile 359.4, at Kansas City, Missouri. The deviation is necessary to allow the replacement of... Railroad Drawbridge, across the Missouri River, mile 359.4, at Kansas City, Missouri to remain in the...

  18. 75 FR 63398 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2010-10-15

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... across the Hackensack River, mile 1.8, at Jersey City, New Jersey. The deviation allows the bridge owner... INFORMATION: The Route 1 & 9 Lincoln Highway Bridge, across the Hackensack River, mile 1.8, at Jersey City...

  19. 76 FR 4818 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2011-01-27

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... Hackensack River, mile 6.9, at Secaucus, New Jersey. The deviation is necessary for electrical rehabilitation...-9826. SUPPLEMENTARY INFORMATION: The Upper Hack Bridge, across the Hackensack River at mile 6.9 has a...

  20. 75 FR 68704 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2010-11-09

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... the Hackensack River, at Secaucus, New Jersey. Under this temporary deviation the bridge may remain in.... SUPPLEMENTARY INFORMATION: The Upper Hack Bridge, across the Hackensack River at mile 6.9 has a vertical...

  1. 76 FR 76637 - Drawbridge Operation Regulation; Saginaw River, Bay City, MI

    Science.gov (United States)

    2011-12-08

    ...-AA09 Drawbridge Operation Regulation; Saginaw River, Bay City, MI AGENCY: Coast Guard, DHS. ACTION... at mile 5.60, and the Lafayette Street Bridge at mile 6.78, all over the Saginaw River at Bay City... the Great Lakes, requested that the existing drawbridge regulation for Saginaw River be reviewed and...

  2. 76 FR 11959 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance

    Science.gov (United States)

    2011-03-04

    ... Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance AGENCY: Coast Guard, DHS. ACTION... 3.1, across the Hackensack River, at Jersey City, New Jersey. The deviation is necessary to perform... River at mile 3.1 has a vertical clearance in the closed position of 35 feet at mean high water and 40...

  3. 76 FR 35978 - Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT

    Science.gov (United States)

    2011-06-21

    ... Operation Regulations; Connecticut River, Old Lyme, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... Connecticut River at Old Lyme, Connecticut. The deviation is necessary to facilitate scheduled maintenance at... the Connecticut River at mile 3.4, at Old Lyme, Connecticut, has a vertical clearance in the closed...

  4. 78 FR 66265 - Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA

    Science.gov (United States)

    2013-11-05

    ... Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA AGENCY: Coast Guard, DHS. ACTION: Notice... Elizabeth River Eastern Branch, mile 1.1, at Norfolk, VA. This deviation is necessary to facilitate... maintenance. The Norfolk Southern 5 railroad Bridge, at mile 1.1, across the Elizabeth River (Eastern Branch...

  5. SPECTR System Operational Test Report

    International Nuclear Information System (INIS)

    Landman, W.H. Jr.

    2011-01-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  6. Overview of Savannah River Plant waste management operations

    International Nuclear Information System (INIS)

    Haywood, J.E.; Killian, T.H.

    1987-01-01

    The Du Pont Savannah River Plant (SRP) Waste Management Program is committed to the safe handling, storage, and disposal of wastes that result from the production of special nuclear materials for the US Department of Energy (US DOE). High-level radioactive liquid waste is stored in underground carbon steel tanks with double containment, and the volume is reduced by evaporation. An effluent treatment facility is being constructed to treat low-level liquid hazardous and radioactive waste. Solid low-level waste operations have been improved through the use of engineered low-level trenches, and transuranic waste handling procedures were modified in 1974 to meet new DOE criteria requiring 20-year retrievable storage. An improved disposal technique, Greater Confinement Disposal, is being demonstrated for intermediate-level waste. Nonradioactive hazardous waste is stored on site in RCRA interim status storage buildings. 5 figs

  7. Savannah River Site Operating Experience with Transuranic (TRU) Waste Retrieval

    International Nuclear Information System (INIS)

    Stone, K.A.; Milner, T.N.

    2006-01-01

    Drums of TRU Waste have been stored at the Savannah River Site (SRS) on concrete pads from the 1970's through the 1980's. These drums were subsequently covered with tarpaulins and then mounded over with dirt. Between 1996 and 2000 SRS ran a successful retrieval campaign and removed some 8,800 drums, which were then available for venting and characterization for WIPP disposal. Additionally, a number of TRU Waste drums, which were higher in activity, were stored in concrete culverts, as required by the Safety Analysis for the Facility. Retrieval of drums from these culverts has been ongoing since 2002. This paper will describe the operating experience and lessons learned from the SRS retrieval activities. (authors)

  8. Transportation System Concept of Operations

    Energy Technology Data Exchange (ETDEWEB)

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower

  9. Computer Operating System Maintenance.

    Science.gov (United States)

    1982-06-01

    FACILITY The Computer Management Information Facility ( CMIF ) system was developed by Rapp Systems to fulfill the need at the CRF to record and report on...computer center resource usage and utilization. The foundation of the CMIF system is a System 2000 data base (CRFMGMT) which stores and permits access

  10. Many rivers to cross. Cross border co-operation in river management

    NARCIS (Netherlands)

    Verwijmeren, J.A.; Wiering, M.A.

    2007-01-01

    River basin management is a key concept in contemporary water policy. Since the management of rivers is best designed and implemented at the scale of the river basin, it seems obvious that we should not confine ourselves to administrative or geographical borders. In other words, river basin

  11. Modeling Reservoir-River Networks in Support of Optimizing Seasonal-Scale Reservoir Operations

    Science.gov (United States)

    Villa, D. L.; Lowry, T. S.; Bier, A.; Barco, J.; Sun, A.

    2011-12-01

    each timestep and minimize computational overhead. Power generation for each reservoir is estimated using a 2-dimensional regression that accounts for both the available head and turbine efficiency. The object-oriented architecture makes run configuration easy to update. The dynamic model inputs include inflow and meteorological forecasts while static inputs include bathymetry data, reservoir and power generation characteristics, and topological descriptors. Ensemble forecasts of hydrological and meteorological conditions are supplied in real-time by Pacific Northwest National Laboratory and are used as a proxy for uncertainty, which is carried through the simulation and optimization process to produce output that describes the probability that different operational scenario's will be optimal. The full toolset, which includes HydroSCOPE, is currently being tested on the Feather River system in Northern California and the Upper Colorado Storage Project.

  12. 78 FR 35756 - Drawbridge Operation Regulations; Charles River, Boston, MA

    Science.gov (United States)

    2013-06-14

    ... Regulations; Charles River, Boston, MA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from...) Bridge across the Charles River, mile 1.0, at Boston, Massachusetts. Under this temporary deviation the... Metropolitan District Commission (Craigie) Bridge, across the Charles River, mile 1.0, at Boston, Massachusetts...

  13. 77 FR 24146 - Drawbridge Operation Regulation; Columbia River, Vancouver, WA

    Science.gov (United States)

    2012-04-23

    ... schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Bridge across the Columbia River... span of the BNSF Railway Bridge across the Columbia River will be disabled and the bridge will not be... allows the swing span of the BNSF Railway Bridge across the Columbia River, mile 105.6, to remain in the...

  14. GloFAS-Seasonal: Operational Seasonal Ensemble River Flow Forecasts at the Global Scale

    Science.gov (United States)

    Emerton, Rebecca; Zsoter, Ervin; Smith, Paul; Salamon, Peter

    2017-04-01

    Seasonal hydrological forecasting has potential benefits for many sectors, including agriculture, water resources management and humanitarian aid. At present, no global scale seasonal hydrological forecasting system exists operationally; although smaller scale systems have begun to emerge around the globe over the past decade, a system providing consistent global scale seasonal forecasts would be of great benefit in regions where no other forecasting system exists, and to organisations operating at the global scale, such as disaster relief. We present here a new operational global ensemble seasonal hydrological forecast, currently under development at ECMWF as part of the Global Flood Awareness System (GloFAS). The proposed system, which builds upon the current version of GloFAS, takes the long-range forecasts from the ECMWF System4 ensemble seasonal forecast system (which incorporates the HTESSEL land surface scheme) and uses this runoff as input to the Lisflood routing model, producing a seasonal river flow forecast out to 4 months lead time, for the global river network. The seasonal forecasts will be evaluated using the global river discharge reanalysis, and observations where available, to determine the potential value of the forecasts across the globe. The seasonal forecasts will be presented as a new layer in the GloFAS interface, which will provide a global map of river catchments, indicating whether the catchment-averaged discharge forecast is showing abnormally high or low flows during the 4-month lead time. Each catchment will display the corresponding forecast as an ensemble hydrograph of the weekly-averaged discharge forecast out to 4 months, with percentile thresholds shown for comparison with the discharge climatology. The forecast visualisation is based on a combination of the current medium-range GloFAS forecasts and the operational EFAS (European Flood Awareness System) seasonal outlook, and aims to effectively communicate the nature of a seasonal

  15. Erosive forms in rivers systems

    International Nuclear Information System (INIS)

    Una Alvarez, E. de; Vidal Romani, J. R.; Rodriguez Martinez-Conde, R.

    2009-01-01

    The purpose of this work is to analyze the geomorphological meaning of the concepts of stability/change and to study its influence on a fluvial erosion system. Different cases of fluvial potholes in Galicia (NW of the Iberian Peninsula) are considered. The work conclusions refer to the nature of the process and its morphological evolution in order to advance towards later contributions with respect of this type of systems. (Author) 14 refs.

  16. Development of autonomous operation system

    International Nuclear Information System (INIS)

    Endou, Akira; Watanabe, Kenshiu; Miki, Tetsushi

    1992-01-01

    To enhance operation reliability of nuclear plants by removing human factors, study on an autonomous operation system has been carried out to substitute artificial intelligence (AI) for plant operators and, in addition, traditional controllers used in existing plants. For construction of the AI system, structurization of knowledge on the basis of the principles such as physical laws, function and structure of relevant objects and generalization of problem solving process are intended. A hierarchical distributed cooperative system configuration in employed because it is superior from the viewpoint of dynamical reorganization of system functions. This configuration is realized by an object-oriented multi-agent system. Construction of a prototype system was planned and the conceptual design was made for FBR plant in order to evaluate applicability of AI to the autonomous operation and to have a prospect for the realization of the system. The prototype system executes diagnosis, state evaluation, operation and control for the main plant subsystems. (author)

  17. Discourse in Systemic Operational Design

    National Research Council Canada - National Science Library

    DiPasquale, Joseph A

    2007-01-01

    .... The monograph presents alternative ways to consider discourse, the implications of this for theory of Systemic Operational Design, and how these alternatives can lead to a richer understanding...

  18. Operating System Abstraction Layer (OSAL)

    Science.gov (United States)

    Yanchik, Nicholas J.

    2007-01-01

    This viewgraph presentation reviews the concept of the Operating System Abstraction Layer (OSAL) and its benefits. The OSAL is A small layer of software that allows programs to run on many different operating systems and hardware platforms It runs independent of the underlying OS & hardware and it is self-contained. The benefits of OSAL are that it removes dependencies from any one operating system, promotes portable, reusable flight software. It allows for Core Flight software (FSW) to be built for multiple processors and operating systems. The presentation discusses the functionality, the various OSAL releases, and describes the specifications.

  19. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  20. Practical Application of Modern Forecasting and Decision Tools at an Operational River Management Agency

    Science.gov (United States)

    Jawdy, C. M.; Carney, S.; Barber, N. M.; Balk, B. C.; Miller, G. A.

    2017-12-01

    The Tennessee Valley Authority (TVA) recently completed a complete overhaul of our River Forecast System (RFS). This modernization effort encompassed: uplift or addition of 89 data feeds calibration of a 140 subbasin rainfall-runoff model calibration of over 650 miles of hydraulic routings implementation of a decision optimization routine for 29 reservoirs implementation of hydrothermal forecast models for five river-cooled thermal plants creation of decision-friendly displays creation of a user-friendly wiki creation of a robust reporting system This talk will walk attendees through how a 24x7 river and grid management agency made decisions around how to operationalize the latest technologies in hydrology, hydraulics, decision science and information technology. The tradeoffs inherent in such an endeavor will be discussed so that research-oriented attendees can understand how best to align their research if they desire adoption within industry. More industry-oriented attendees can learn about the mechanics of how to succeed at such a large and complex project. Following the description of the modernization project, I can discuss TVA's plans for future growth of the system. We plan to add the following capabilities in the coming years: forecast verification tools to communicate floodplain risk tools to choose the best possible model forcings ensemble inflow modelling a river policy that allows for more reasonable tradeoff of benefits river decisions based on ensembles The iterative staging of such improvements is highly fraught with technical, political and operational risks. I will discuss how TVA's is using what we learned in the RFS modernization effort to grow further into delivering on the promise of these additional technologies.

  1. 76 FR 47440 - Drawbridge Operation Regulations; Passaic River, Jersey City, NJ

    Science.gov (United States)

    2011-08-05

    ... Operation Regulations; Passaic River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Route 1 & 9 Bridge across the Passaic River, mile 1.8, at Jersey City, New Jersey. The deviation is necessary to facilitate bridge painting...

  2. 76 FR 4819 - Drawbridge Operation Regulations; Passaic River, Jersey City, NJ

    Science.gov (United States)

    2011-01-27

    ... Operation Regulations; Passaic River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Route 1 & 9 Bridge across the Passaic River, mile 1.8, at Jersey City, New Jersey. The deviation is necessary for bridge painting. This deviation...

  3. 78 FR 28139 - Drawbridge Operation Regulation; Tuckahoe River, Between Corbin City and Upper Township, NJ

    Science.gov (United States)

    2013-05-14

    ... Operation Regulation; Tuckahoe River, Between Corbin City and Upper Township, NJ AGENCY: Coast Guard, DHS... River, mile 8.0, between Corbin City and Upper Township, NJ. The deviation is necessary to facilitate... operating schedule, the State Highway Bridge, mile 8.0, between Corbin City and Upper Township, NJ shall...

  4. 75 FR 30299 - Drawbridge Operation Regulations; Fox River, Green Bay, WI

    Science.gov (United States)

    2010-06-01

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-0374] Drawbridge Operation Regulations; Fox River, Green Bay, WI AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... from the regulation governing the operation of the Main Street Bridge at Mile 1.21 over the Fox River...

  5. 77 FR 6465 - Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT

    Science.gov (United States)

    2012-02-08

    ... Operation Regulations; Connecticut River, Old Lyme, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Old Saybrook-Old Lyme RR Bridge, mile 3.4, across the Connecticut River at Old Lyme, Connecticut. The deviation is necessary to facilitate bridge...

  6. 46 CFR 180.208 - Survival craft-vessels operating on rivers routes.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft-vessels operating on rivers routes. 180... VESSELS (UNDER 100 GROSS TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Number and Type of Survival Craft § 180.208 Survival craft—vessels operating on rivers routes. (a) Except as allowed by paragraphs (c), (d...

  7. 46 CFR 117.208 - Survival craft-vessels operating on rivers routes.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Survival craft-vessels operating on rivers routes. 117... LIFESAVING EQUIPMENT AND ARRANGEMENTS Number and Type of Survival Craft § 117.208 Survival craft—vessels... vessel certificated to operate on a rivers route in warm water is not required to carry survival craft...

  8. 75 FR 62469 - Drawbridge Operation Regulations; Charles River, Boston, MA, Maintenance

    Science.gov (United States)

    2010-10-12

    ... Operation Regulations; Charles River, Boston, MA, Maintenance AGENCY: Coast Guard, DHS. ACTION: Notice of... Craigie Bridge across the Charles River at mile 1.0, has a vertical clearance of 10.25 feet at normal pool... temporary deviation from the regulation governing the operation of the Craigie Bridge across the Charles...

  9. 78 FR 21537 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-04-11

    ... Operation Regulations; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Front Street 5K Run...

  10. 78 FR 69995 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-11-22

    ... Operation Regulation; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the bridge owner time...

  11. 78 FR 56607 - Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY

    Science.gov (United States)

    2013-09-13

    ...-AA09 Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY AGENCY: Coast Guard, DHS... operation of the highway bridge across the Hudson River, mile 152.7, between Troy and Green Island, New York... Street Bridge, mile 155.4, between Troy and Cohoes which has been converted to a fixed bridge. It is...

  12. 75 FR 76632 - Drawbridge Operation Regulation; Upper Mississippi River, Hannibal, MO

    Science.gov (United States)

    2010-12-09

    ... Operation Regulation; Upper Mississippi River, Hannibal, MO AGENCY: Coast Guard, DHS. ACTION: Notice of... temporary deviation from the regulation governing the operation of the Hannibal Railroad Drawbridge across the Upper Mississippi River, mile 309.9, at Hannibal, Missouri. The deviation is necessary to allow...

  13. 77 FR 28488 - Drawbridge Operation Regulation; Upper Mississippi River, Hannibal, MO

    Science.gov (United States)

    2012-05-15

    ... Operation Regulation; Upper Mississippi River, Hannibal, MO AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Hannibal Railroad Drawbridge across the Upper Mississippi River, mile 309.9, at Hannibal, Missouri. The deviation is necessary to allow the replacement of eight wire rope...

  14. 78 FR 64887 - Drawbridge Operation Regulation; Upper Mississippi River, Hannibal, MO

    Science.gov (United States)

    2013-10-30

    ... Operation Regulation; Upper Mississippi River, Hannibal, MO AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Hannibal Railroad Drawbridge across the Upper Mississippi River, mile 309.9, at Hannibal, Missouri. The deviation is necessary to allow the bridge owner time to replace...

  15. Disk Operating System User's Guide

    Science.gov (United States)

    1972-05-01

    This document serves the purpose of bringing together in one place most of the information a user needs to use the DDP-516 Disk Operating System, (DOS). DOS is a core resident, one user, console-oriented operating system which allows the user to cont...

  16. Operational Hydrologic Forecasts in the Columbia River Basin

    Science.gov (United States)

    Shrestha, K. Y.; Curry, J. A.; Webster, P. J.; Toma, V. E.; Jelinek, M.

    2013-12-01

    The Columbia River Basin (CRB) covers an area of ~670,000 km2 and stretches across parts of seven U.S. states and one Canadian province. The basin is subject to a variable climate, and moisture stored in snowpack during the winter is typically released in spring and early summer. These releases contribute to rapid increases in flow. A number of impoundments have been constructed on the Columbia River main stem and its tributaries for the purposes of flood control, navigation, irrigation, recreation, and hydropower. Storage reservoirs allow water managers to adjust natural flow patterns to benefit water and energy demands. In the past decade, the complexity of water resource management issues in the basin has amplified the importance of streamflow forecasting. Medium-range (1-10 day) numerical weather forecasts of precipitation and temperature can be used to drive hydrological models. In this work, probabilistic meteorological variables from the European Center for Medium Range Weather Forecasting (ECMWF) are used to force the Variable Infiltration Capacity (VIC) model. Soil textures were obtained from FAO data; vegetation types / land cover information from UMD land cover data; stream networks from USGS HYDRO1k; and elevations from CGIAR version 4 SRTM data. The surface energy balance in 0.25° (~25 km) cells is closed through an iterative process operating at a 6 hour timestep. Output fluxes from a number of cells in the basin are combined through one-dimensional flow routing predicated on assumptions of linearity and time invariance. These combinations lead to daily mean streamflow estimates at key locations throughout the basin. This framework is suitable for ingesting daily numerical weather prediction data, and was calibrated using USGS mean daily streamflow data at the Dalles Dam (TDA). Operational streamflow forecasts in the CRB have been active since October 2012. These are 'naturalized' or unregulated forecasts. In 2013, increases of ~2600 m3/s (~48% of

  17. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  18. Lowland river systems - processes, form and function

    DEFF Research Database (Denmark)

    Pedersen, M. L.; Kronvang, B.; Sand-Jensen, K.

    2006-01-01

    Present day river valleys and rivers are not as dynamic and variable as they used to be. We will here describe the development and characteristics of rivers and their valleys and explain the background to the physical changes in river networks and channel forms from spring to the sea. We seek...... to answer two fundamental questions: How has anthropogenic disturbance of rivers changed the fundamental form and physical processes in river valleys? Can we use our understanding of fl uvial patterns to restore the dynamic nature of channelised rivers and drained fl oodplains in river valleys?...

  19. Operational readiness of EFAD systems

    International Nuclear Information System (INIS)

    Kabat, M.J.

    1992-02-01

    An assessment of the operational readiness of the Emergency Filtered Air Discharge (EFAD) systems, installed in Canadian CANDU multi-unit nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on EFAD system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of EFAD systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for revisions which are needed to achieve and maintain appropriate operational readiness of EFAD systems

  20. The THUDSOS Distributed Operating System

    Institute of Scientific and Technical Information of China (English)

    廖先Zhi; 刘旭峰; 等

    1991-01-01

    The THUDSOS is a distributed operating system modeled as an abstract machine which provides decentralized control,transparency,availability,and reliability,as welol as a good degree of autonomy at each node,that makes our distributed system usable.Our operating system supports transparent access to data through network wide filesystem.The simultaneous access to any device is discussed for the case when the peripherals are treated as files.This operating system allows spawning of parallel application programs to solve problems in the fields,such as numerical analysis and artificial intelligence.

  1. Network operating system focus technology

    Science.gov (United States)

    1985-01-01

    An activity structured to provide specific design requirements and specifications for the Space Station Data Management System (DMS) Network Operating System (NOS) is outlined. Examples are given of the types of supporting studies and implementation tasks presently underway to realize a DMS test bed capability to develop hands-on understanding of NOS requirements as driven by actual subsystem test beds participating in the overall Johnson Space Center test bed program. Classical operating system elements and principal NOS functions are listed.

  2. Plant operator performance evaluation system

    International Nuclear Information System (INIS)

    Ujita, Hiroshi; Fukuda, Mitsuko; Kubota, Ryuji.

    1989-01-01

    A plant operator performance evaluation system to analyze plant operation records during accident training and to identify and classify operator errors has been developed for the purpose of supporting realization of a training and education system for plant operators. A knowledge engineering technique was applied to evaluation of operator behavior by both even-based and symptom-based procedures, in various situations including event transition due to multiple failures or operational errors. The system classifies the identified errors as to their single and double types based on Swain's error classification and the error levels reflecting Rasmussen's cognitive level, and it also evaluates the effect of errors on plant state and then classifies error influence, using 'knowledge for phenomena and operations', as represented by frames. It has additional functions for analysis of error statistics and knowledge acquisition support of 'knowledge for operations'. The system was applied to a training analysis for a scram event in a BWR plant, and its error analysis function was confirmed to be effective by operational experts. (author)

  3. Model based hydropower gate operation for mitigation of CSO impacts by means of river base flow increase.

    Science.gov (United States)

    Achleitner, S; De Toffol, S; Engelhard, C; Rauch, W

    2005-01-01

    In river stretches being subjected to flow regulation, usually for the purpose of energy production (e.g. Hydropower) or flood protection (river barrage), a special measure can be taken against the effect of combined sewer overflows (CSOs). The basic idea is the temporal increase of the river base flow (during storm weather) as an in-stream measure for mitigation of CSO spilling. The focus is the mitigation of the negative effect of acute pollution of substances. The measure developed can be seen as an application of the classic real time control (RTC) concept onto the river system. Upstream gate operation is to be based on real time monitoring and forecasting of precipitation. The main objective is the development of a model based predictive control system for the gate operation, by modelling of the overall wastewater system (incl. the receiving water). The main emphasis is put on the operational strategy and the appropriate short-term forecast of spilling events. The potential of the measure is tested for the application of the operational strategy and its ecological and economic feasibility. The implementation of such an in-stream measure into the hydropower's operational scheme is unique. Advantages are (a) the additional in-stream dilution of acute pollutants entering the receiving water and (b) the resulting minimization of the required CSO storage volume.

  4. Susquehanna River Basin Hydrologic Observing System (SRBHOS)

    Science.gov (United States)

    Reed, P. M.; Duffy, C. J.; Dressler, K. A.

    2004-12-01

    In response to the NSF-CUAHSI initiative for a national network of Hydrologic Observatories, we propose to initiate the Susquehanna River Basin Hydrologic Observing System (SRBHOS), as the northeast node. The Susquehanna has a drainage area of 71, 410 km2. From the headwaters near Cooperstown, NY, the river is formed within the glaciated Appalachian Plateau physiographic province, crossing the Valley and Ridge, then the Piedmont, before finishing its' 444 mile journey in the Coastal Plain of the Chesapeake Bay. The Susquehanna is the major source of water and nutrients to the Chesapeake. It has a rich history in resource development (logging, mining, coal, agriculture, urban and heavy industry), with an unusual resilience to environmental degradation, which continues today. The shallow Susquehanna is one of the most flood-ravaged rivers in the US with a decadal regularity of major damage from hurricane floods and rain-on-snow events. As a result of this history, it has an enormous infrastructure for climate, surface water and groundwater monitoring already in place, including the nations only regional groundwater monitoring system for drought detection. Thirty-six research institutions have formed the SRBHOS partnership to collaborate on a basin-wide network design for a new scientific observing system. Researchers at the partner universities have conducted major NSF research projects within the basin, setting the stage and showing the need for a new terrestrial hydrologic observing system. The ultimate goal of SRBHOS is to close water, energy and solute budgets from the boundary layer to the water table, extending across plot, hillslope, watershed, and river basin scales. SRBHOS is organized around an existing network of testbeds (legacy watershed sites) run by the partner universities, and research institutions. The design of the observing system, when complete, will address fundamental science questions within major physiographic regions of the basin. A nested

  5. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  6. Managing water and riparian habitats on the Bill Williams River with scientific benefit for other desert river systems

    Science.gov (United States)

    John Hickey,; Woodrow Fields,; Andrew Hautzinger,; Steven Sesnie,; Shafroth, Patrick B.; Dick Gilbert,

    2016-01-01

    This report details modeling to: 1) codify flow-ecology relationships for riparian species of the Bill Williams River as operational guidance for water managers, 2) test the guidance under different climate scenarios, and 3) revise the operational guidance as needed to address the effects of climate change. Model applications detailed herein include the River Analysis System  (HEC-RAS) and the Ecosystem Functions Model  (HEC-EFM), which was used to generate more than three million estimates of local seedling recruitment areas. Areas were aggregated and compared to determine which scenarios generated the most seedling area per unit volume of water. Scenarios that maximized seedling area were grouped into a family of curves that serve as guidance for water managers. This work has direct connections to water management decision-making and builds upon and adds to the rich history of science-based management for the Bill Williams River, Arizona, USA. 

  7. Selecting a Cable System Operator.

    Science.gov (United States)

    Cable Television Information Center, Washington, DC.

    Intended to assist franchising authorities with the process of selecting a cable television system operator from franchise applicants, this document provides a framework for analysis of individual applications. Section 1 deals with various methods which can be used to select an operator. The next section covers the application form, the vehicle a…

  8. Towards a network operating system

    OpenAIRE

    López Álvarez, Victor; Gonzalez de Dios, Oscar; Fuentes, Beatriz; Yannuzzi, Marcelo; Fernández Palacios, Juan Pedro; Lopez, Diego

    2014-01-01

    A Network Operating System (NetOS) is a novel paradigm for developing a next-generation network management and operation platform. As we shall describe, NetOS not only goes far beyond the SDN concepts but also constitutes a fundamental enabler for NFV. © 2014 OSA.

  9. Upgrade of the Department of Energy's Savannah River Site's reactor operations and maintenance procedures

    International Nuclear Information System (INIS)

    Walsh, T.E.

    1991-01-01

    This paper describes the program in progress at the Savannah River Site (SRS) to upgrade the existing reactor operating and maintenance procedures to current commercial nuclear industry standards. In order to meet this goal, the following elements were established: administrative procedures to govern the upgrade process, tracking system to provide status and accountability; and procedure writing guides. The goal is to establish a benchmark of excellence by which other Department of Energy (DOE) sites will measure themselves. The above three elements are addressed in detail in this paper

  10. Cascade reservoir flood control operation based on risk grading and warning in the Upper Yellow River

    Science.gov (United States)

    Xuejiao, M.; Chang, J.; Wang, Y.

    2017-12-01

    Flood risk reduction with non-engineering measures has become the main idea for flood management. It is more effective for flood risk management to take various non-engineering measures. In this paper, a flood control operation model for cascade reservoirs in the Upper Yellow River was proposed to lower the flood risk of the water system with multi-reservoir by combining the reservoir flood control operation (RFCO) and flood early warning together. Specifically, a discharge control chart was employed to build the joint RFCO simulation model for cascade reservoirs in the Upper Yellow River. And entropy-weighted fuzzy comprehensive evaluation method was adopted to establish a multi-factorial risk assessment model for flood warning grade. Furthermore, after determining the implementing mode of countermeasures with future inflow, an intelligent optimization algorithm was used to solve the optimization model for applicable water release scheme. In addition, another model without any countermeasure was set to be a comparative experiment. The results show that the model developed in this paper can further decrease the flood risk of water system with cascade reservoirs. It provides a new approach to flood risk management by coupling flood control operation and flood early warning of cascade reservoirs.

  11. DMSP OLS - Operational Linescan System

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Visible and infrared imagery from DMSP Operational Linescan System (OLS) instruments are used to monitor the global distribution of clouds and cloud top temperatures...

  12. Operating systems for experimental physics

    International Nuclear Information System (INIS)

    Davies, H.E.

    1976-01-01

    Modern high energy physics experiments are very dependent on the use of computers and present a fairly well defined list of technical demands on them. It is therefore possible to look at the construction of a computer operating system and to see how the design choices should be made in order to make the systems as useful as possible to physics experiments or, more practically, to look at existing operating systems to see which can most easily be used to do the jobs of rapid data acquisition and checking. In these notes, operating systems are looked at from the point of view of the informed user. Emphasis is placed on systems which are intended for single processor microcomputers of the type frequently used for data acquisition applications. The principles described are, of course, equally valid for other kinds of system. (Auth.)

  13. Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation, 2007-2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Merz, Norm [Kootenai Tribe of Idaho

    2009-02-18

    The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is known as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive management of the research designs to evaluate the ecologic functions lost due to the operation of federal hydropower facilities. The unique nature of this project (scientific team, newest/best science, adaptive management, assessment of ecological functions, etc.) has been to work in a dynamic RDRT process. In addition to being multidisciplinary, this model KTOI project provides a stark contrast to the sometimes inflexible process (review, re-review, budgets, etc.) of the Columbia River Basin Fish and Wildlife Program. The project RDRT is assembled annually, with subgroups meeting as needed throughout the year to address project issues, analyses, review, and interpretation. Activities of RDRT coordinated and directed the selection of research and assessment methodologies appropriate for the Kootenai River Watershed and potential for regional application in the Columbia River Basin. The entire RDRT continues to meet annually to update and discuss project progress. RDRT Subcontractors work in smaller groups throughout the year to meet project objectives. Determining the extent to

  14. 77 FR 47789 - Drawbridge Operation Regulation; Sacramento River, CA

    Science.gov (United States)

    2012-08-10

    ...-Club Yacht Association, the Recreational Boaters of California, the Capital City Yacht Club, the Sacramento Yacht Club, River View Yacht Club and Hornblower Cruises. D. Discussion of Proposed Rule Under the...

  15. 77 FR 51700 - Drawbridge Operation Regulations; Wando River, Cainhoy, SC

    Science.gov (United States)

    2012-08-27

    ... shape in the ``Actions'' column. If you submit your comments by mail or hand delivery, submit them in an... Wando River mile 10.0, Cainhoy, Berkeley County, South Carolina has a vertical clearance of 6 feet in...

  16. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  17. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  18. Mitigation and enhancement techniques for the Upper Mississippi River system and other large river systems

    Science.gov (United States)

    Schnick, Rosalie A.; Morton, John M.; Mochalski, Jeffrey C.; Beall, Jonathan T.

    1982-01-01

    Extensive information is provided on techniques that can reduce or eliminate the negative impact of man's activities (particularly those related to navigation) on large river systems, with special reference to the Upper Mississippi River. These techniques should help resource managers who are concerned with such river systems to establish sound environmental programs. Discussion of each technique or group of techniques include (1) situation to be mitigated or enhanced; (2) description of technique; (3) impacts on the environment; (4) costs; and (5) evaluation for use on the Upper Mississippi River Systems. The techniques are divided into four primary categories: Bank Stabilization Techniques, Dredging and Disposal of Dredged Material, Fishery Management Techniques, and Wildlife Management Techniques. Because techniques have been grouped by function, rather than by structure, some structures are discussed in several contexts. For example, gabions are discussed for use in revetments, river training structures, and breakwaters. The measures covered under Bank Stabilization Techniques include the use of riprap revetments, other revetments, bulkheads, river training structures, breakwater structures, chemical soil stabilizers, erosion-control mattings, and filter fabrics; the planting of vegetation; the creation of islands; the creation of berms or enrichment of beaches; and the control of water level and boat traffic. The discussions of Dredging and the Disposal of Dredged Material consider dredges, dredging methods, and disposal of dredged material. The following subjects are considered under Fishery Management Techniques: fish attractors; spawning structures; nursery ponds, coves, and marshes; fish screens and barriers; fish passage; water control structures; management of water levels and flows; wing dam modification; side channel modification; aeration techniques; control of nuisance aquatic plants; and manipulated of fish populations. Wildlife Management

  19. Optimization of power system operation

    CERN Document Server

    Zhu, Jizhong

    2015-01-01

    This book applies the latest applications of new technologies topower system operation and analysis, including new and importantareas that are not covered in the previous edition. Optimization of Power System Operation covers both traditional andmodern technologies, including power flow analysis, steady-statesecurity region analysis, security constrained economic dispatch,multi-area system economic dispatch, unit commitment, optimal powerflow, smart grid operation, optimal load shed, optimalreconfiguration of distribution network, power system uncertaintyanalysis, power system sensitivity analysis, analytic hierarchicalprocess, neural network, fuzzy theory, genetic algorithm,evolutionary programming, and particle swarm optimization, amongothers. New topics such as the wheeling model, multi-areawheeling, the total transfer capability computation in multipleareas, are also addressed. The new edition of this book continues to provide engineers andac demics with a complete picture of the optimization of techn...

  20. 77 FR 14689 - Drawbridge Operation Regulation; Berwick Bay (Atchafalaya River), Morgan City, LA

    Science.gov (United States)

    2012-03-13

    ... Operation Regulation; Berwick Bay (Atchafalaya River), Morgan City, LA AGENCY: Coast Guard, DHS. ACTION... Fe (BNSF) Railway Company vertical lift span bridge across Berwick Bay, mile 0.4, (Atchafalaya River, mile 17.5) at Morgan City, St. Mary Parish, Louisiana. The deviation is necessary to perform scheduled...

  1. 78 FR 35756 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Science.gov (United States)

    2013-06-14

    ... Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... from the regulation governing the operation of the Willis Avenue Bridge across the Harlem River, mile 1... found at 33 CFR 117.789(b)(2). The bridge owner, New York City Department of Transportation, requested a...

  2. 78 FR 66266 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2013-11-05

    ... Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... from the regulations governing the operation of the Path (Railroad) Bridge across the Hackensack River, mile 3.0, at Jersey City, New Jersey. Under this temporary deviation, the bridge may remain in the...

  3. 75 FR 69878 - Drawbridge Operation Regulation; Neuse River, New Bern, NC

    Science.gov (United States)

    2010-11-16

    ... Operation Regulation; Neuse River, New Bern, NC AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Fifth Coast Guard District, has issued a temporary... is given. NSR has requested a temporary deviation to the existing regulations for the Neuse River...

  4. 75 FR 81125 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-12-27

    ... Operation Regulation; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... the Upper Mississippi River, mile 481.4, at Rock Island, Illinois. The deviation is necessary to allow... Rock Island, Illinois to open on signal if at least 24 hours advance notice is given for 44 days from...

  5. 78 FR 31454 - Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY

    Science.gov (United States)

    2013-05-24

    ...-AA09 Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY AGENCY: Coast Guard, DHS... that governs the highway bridge (Troy Green Island) across the Hudson River, mile 152.7, between Troy... the regulations for the 112th Street Bridge, mile 155.4, between Troy and Cohoes which has been...

  6. 76 FR 70345 - Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA

    Science.gov (United States)

    2011-11-14

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2011-1022] Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA AGENCY: Coast Guard, DHS. ACTION: Notice... periodic maintenance. The Norfolk Southern 5 Bridge, at mile 1.1, across the Elizabeth River (Eastern...

  7. Redesigning the District Operating System

    Science.gov (United States)

    Hodas, Steven

    2015-01-01

    In this paper, we look at the inner workings of a school district through the lens of the "district operating system (DOS)," a set of interlocking mutually-reinforcing modules that includes functions like procurement, contracting, data and IT policy, the general counsel's office, human resources, and the systems for employee and family…

  8. Flow Regime Changes: From Impounding a Temperate Lowland River to Small Hydropower Operations

    Directory of Open Access Journals (Sweden)

    Petras Punys

    2015-07-01

    Full Text Available This article discusses the environmental issues facing small hydropower plants (SHPs operating in temperate lowland rivers of Lithuania. The research subjects are two medium head reservoir type hydro schemes considered within a context of the global fleet of SHPs in the country. This research considers general abiotic indicators (flow, level, water retention time in the reservoirs of the stream that may affect the aquatic systems. The main idea was to test whether the hydrologic regime has been altered by small hydropower dams. The analysis of changes in abiotic indicators is a complex process, including both pre- and post-reservoir construction and post commissioning of the SHPs under operation. Downstream hydrograph (flow and stage ramping is also an issue for operating SHPs that can result in temporary rapid changes in flow and consequently negatively impact aquatic resources. This ramping has been quantitatively evaluated. To avoid the risk of excessive flow ramping, the types of turbines available were evaluated and the most suitable types for the natural river flow regime were identified. The results of this study are to allow for new hydro schemes or upgrades to use water resources in a more sustainable way.

  9. SWOT data assimilation for operational reservoir management on the upper Niger River Basin

    Science.gov (United States)

    Munier, S.; Polebistki, A.; Brown, C.; Belaud, G.; Lettenmaier, D. P.

    2015-01-01

    The future Surface Water and Ocean Topography (SWOT) satellite mission will provide two-dimensional maps of water elevation for rivers with width greater than 100 m globally. We describe a modeling framework and an automatic control algorithm that prescribe optimal releases from the Selingue dam in the Upper Niger River Basin, with the objective of understanding how SWOT data might be used to the benefit of operational water management. The modeling framework was used in a twin experiment to simulate the "true" system state and an ensemble of corrupted model states. Virtual SWOT observations of reservoir and river levels were assimilated into the model with a repeat cycle of 21 days. The updated state was used to initialize a Model Predictive Control (MPC) algorithm that computed the optimal reservoir release that meets a minimum flow requirement 300 km downstream of the dam. The data assimilation results indicate that the model updates had a positive effect on estimates of both water level and discharge. The "persistence," which describes the duration of the assimilation effect, was clearly improved (greater than 21 days) by integrating a smoother into the assimilation procedure. We compared performances of the MPC with SWOT data assimilation to an open-loop MPC simulation. Results show that the data assimilation resulted in substantial improvements in the performances of the Selingue dam management with a greater ability to meet environmental requirements (the number of days the target is missed falls to zero) and a minimum volume of water released from the dam.

  10. System Dynamics Modeling of Multipurpose Reservoir Operation

    Directory of Open Access Journals (Sweden)

    Ebrahim Momeni

    2006-03-01

    Full Text Available System dynamics, a feedback – based object – oriented simulation approach, not only represents complex dynamic systemic systems in a realistic way but also allows the involvement of end users in model development to increase their confidence in modeling process. The increased speed of model development, the possibility of group model development, the effective communication of model results, and the trust developed in the model due to user participation are the main strengths of this approach. The ease of model modification in response to changes in the system and the ability to perform sensitivity analysis make this approach more attractive compared with systems analysis techniques for modeling water management systems. In this study, a system dynamics model was developed for the Zayandehrud basin in central Iran. This model contains river basin, dam reservoir, plains, irrigation systems, and groundwater. Current operation rule is conjunctive use of ground and surface water. Allocation factor for each irrigation system is computed based on the feedback from groundwater storage in its zone. Deficit water is extracted from groundwater.The results show that applying better rules can not only satisfy all demands such as Gawkhuni swamp environmental demand, but it can also  prevent groundwater level drawdown in future.

  11. Operations Monitoring Assistant System Design

    Science.gov (United States)

    1986-07-01

    Logic. Artificial Inteligence 25(1)::75-94. January.18. 41 -Nils J. Nilsson. Problem-Solving Methods In Artificli Intelligence. .klcG raw-Hill B3ook...operations monitoring assistant (OMA) system is designed that combines operations research, artificial intelligence, and human reasoning techniques and...KnowledgeCraft (from Carnegie Group), and 5.1 (from Teknowledze). These tools incorporate the best methods of applied artificial intelligence, and

  12. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  13. 78 FR 16411 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-03-15

    ... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Quad City Heart...-366-9826. [[Page 16412

  14. Space station operating system study

    Science.gov (United States)

    Horn, Albert E.; Harwell, Morris C.

    1988-01-01

    The current phase of the Space Station Operating System study is based on the analysis, evaluation, and comparison of the operating systems implemented on the computer systems and workstations in the software development laboratory. Primary emphasis has been placed on the DEC MicroVMS operating system as implemented on the MicroVax II computer, with comparative analysis of the SUN UNIX system on the SUN 3/260 workstation computer, and to a limited extent, the IBM PC/AT microcomputer running PC-DOS. Some benchmark development and testing was also done for the Motorola MC68010 (VM03 system) before the system was taken from the laboratory. These systems were studied with the objective of determining their capability to support Space Station software development requirements, specifically for multi-tasking and real-time applications. The methodology utilized consisted of development, execution, and analysis of benchmark programs and test software, and the experimentation and analysis of specific features of the system or compilers in the study.

  15. Savannah River Laboratory's operating experience with glass melters

    International Nuclear Information System (INIS)

    Brown, F.H.; Randall, C.T.; Cosper, M.B.; Moseley, J.P.

    1982-01-01

    The Department of Energy, with recommendations from the Du Pont Company, is proposing that a Defense Waste Processing Facility be constructed at the Savannah River Plant to immobilize radioactive The immobilization process is designed around the solidification of waste sludge in borosilicate glass. The Savannah River Laboratory, who is responsible for the solidification process development program, has completed an experimental program with one large-scale glass melter and just started up another melter. Experimental data indicate that process requirements can easily be met with the current design. 7 figures

  16. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  17. Operating System for Runtime Reconfigurable Multiprocessor Systems

    Directory of Open Access Journals (Sweden)

    Diana Göhringer

    2011-01-01

    Full Text Available Operating systems traditionally handle the task scheduling of one or more application instances on processor-like hardware architectures. RAMPSoC, a novel runtime adaptive multiprocessor System-on-Chip, exploits the dynamic reconfiguration on FPGAs to generate, start and terminate hardware and software tasks. The hardware tasks have to be transferred to the reconfigurable hardware via a configuration access port. The software tasks can be loaded into the local memory of the respective IP core either via the configuration access port or via the on-chip communication infrastructure (e.g. a Network-on-Chip. Recent-series of Xilinx FPGAs, such as Virtex-5, provide two Internal Configuration Access Ports, which cannot be accessed simultaneously. To prevent conflicts, the access to these ports as well as the hardware resource management needs to be controlled, e.g. by a special-purpose operating system running on an embedded processor. For that purpose and to handle the relations between temporally and spatially scheduled operations, the novel approach of an operating system is of high importance. This special purpose operating system, called CAP-OS (Configuration Access Port-Operating System, which will be presented in this paper, supports the clients using the configuration port with the services of priority-based access scheduling, hardware task mapping and resource management.

  18. 76 FR 17541 - Drawbridge Operation Regulation; Mermentau River, Grand Chenier, LA

    Science.gov (United States)

    2011-03-30

    ... temporary deviation from the regulation governing the operation of the SR 82 swing span bridge across the... from the operating schedule of the swing span bridge across the Mermentau River at mile 7.1 in Grand... Sea Level. Vessels are able to transit under the bridge during operations. There is an alternate...

  19. 77 FR 3664 - Drawbridge Operation Regulation; Sacramento River, CA

    Science.gov (United States)

    2012-01-25

    ... performed on this proposal to various waterway user organizations including the Pacific Inter-Club Yacht Association, the Recreational Boaters of California, the Capital City Yacht Club, the Sacramento Yacht Club, River View Yacht Club and Hornblower Cruises. The Coast Guard policy regarding the promulgation of...

  20. 77 FR 40265 - Drawbridge Operation Regulation; Tennessee River, Decatur, AL

    Science.gov (United States)

    2012-07-09

    ... p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email Eric A. Washburn, Bridge Administrator, Western Rivers, Coast Guard; telephone 314-269-2378, email [email protected] . If you have questions on viewing the docket, call...

  1. 78 FR 76195 - Drawbridge Operation Regulations; Hackensack River, New Jersey

    Science.gov (United States)

    2013-12-17

    ... Upper Hack and HX Bridges, miles 6.9 and 7.7, respectively, all across the Hackensack River, NJ to... Upper Hack Bridge, mile 6.9, has a vertical clearance of 8 feet at mean high water, and 13 feet at mean... so at all times. Under this temporary deviation the PATH, Portal, Upper Hack and HX bridges may...

  2. 76 FR 17542 - Drawbridge Operation Regulations; Rainy River, Ranier, MN

    Science.gov (United States)

    2011-03-30

    ... Railway Bridge across the Rainy River at Mile 85.0 at Rainer, Minnesota. This rule addresses the request... States of America and Canada. This bridge is a single leaf bascule type railroad bridge that provides a... vessels, and both power and sail recreational vessels. The railroad bridge carries significant train...

  3. Radiological impact of 2016 operations at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Minter, K. L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Jannik, G. T. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Dixon, K. M. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-06-01

    This report presents the environmental dose assessment methods and the estimated potential doses to the offsite public from 2016 Savannah River Site (SRS) air and liquid radioactive releases. Also documented are potential doses from special-case exposure scenarios, such as the consumption of wildlife or goat milk.

  4. An Optimization Waste Load Allocation Model in River Systems

    Science.gov (United States)

    Amirpoor Daylami, A.; jarihani, A. A.; Aminisola, K.

    2012-04-01

    In many river systems, increasing of the waste discharge leads to increasing pollution of these water bodies. While the capacity of the river flow for pollution acceptance is limited and the ability of river to clean itself is restricted, the dischargers have to release their waste into the river after a primary pollution treatment process. Waste Load Allocation as a well-known water quality control strategy is used to determine the optimal pollutant removal at a number of point sources along the river. This paper aim at developing a new approach for treatment and management of wastewater inputs into the river systems, such that water quality standards in these receiving waters are met. In this study, inspired by the fact that cooperation among some single point source waste dischargers can lead to a more waste acceptance capacity and/or more optimum quality control in a river, an efficient approach was implemented to determine both primary waste water treatment levels and/or the best releasing points of the waste into the river. In this methodology, a genetic algorithm is used as an optimization tool to calculate optimal fraction removal levels of each one of single or shared discharger. Besides, a sub-model embedded to optimization model was used to simulate water quality of the river in each one of discharging scenarios based on the modified Streeter and Phelps quality equations. The practical application of the model is illustrated with a case study of the Gharesoo river system in west of Iran.

  5. Remote operation system for container

    International Nuclear Information System (INIS)

    Nakahara, Hirotaka; Hayata, Takashi; Kajiyama, Shigeru; Takahashi, Fuminobu

    1998-01-01

    The present invention provides a remote operation system for conducting operation with operation reaction for the inside of a container filled with water (liquid), such as of inner walls and inner structural materials of a BWR type reactor. Namely, a swimming robot comprises a swimming device swimming in the liquid and an attaching/detaching device for holding/releasing the handling robot. A control device remotely operate the swimming robot and the handling robot by way of a cable. A cable processing device takes up or dispenses the cable. In addition, when the swimming robot grasps the handling robot by the attaching/detaching device, the swimming robot transmits an operation instruction sent from the control device by way of the cable to the handling robot. After the attaching/detaching device of the swimming robot releases the handling robot, the handling robot operates based on the transmitted operation instruction. It is preferable that the handling robot has an adsorptive moving device for moving itself while being adsorbed on the wall surface of the container. (I.S.)

  6. Advanced Transport Operating Systems Program

    Science.gov (United States)

    White, John J.

    1990-01-01

    NASA-Langley's Advanced Transport Operating Systems Program employs a heavily instrumented, B 737-100 as its Transport Systems Research Vehicle (TRSV). The TRSV has been used during the demonstration trials of the Time Reference Scanning Beam Microwave Landing System (TRSB MLS), the '4D flight-management' concept, ATC data links, and airborne windshear sensors. The credibility obtainable from successful flight test experiments is often a critical factor in the granting of substantial commitments for commercial implementation by the FAA and industry. In the case of the TRSB MLS, flight test demonstrations were decisive to its selection as the standard landing system by the ICAO.

  7. Operation of large cryogenic systems

    International Nuclear Information System (INIS)

    Rode, C.H.; Ferry, B.; Fowler, W.B.; Makara, J.; Peterson, T.; Theilacker, J.; Walker, R.

    1985-06-01

    This report is based on the past 12 years of experiments on R and D and operation of the 27 kW Fermilab Tevatron Cryogenic System. In general the comments are applicable for all helium plants larger than 1000W (400 l/hr) and non mass-produced nitrogen plants larger than 50 tons per day. 14 refs., 3 figs., 1 tab

  8. Spill operation system decision support system

    International Nuclear Information System (INIS)

    Clark, R.

    1992-01-01

    The MSRC Spill Operation System (SOS) is a tool for the support of decision-making at the time of a catastrophic oil spill. SOS provides MSRC decision-makers with access to information about the source of the spill, the spill environment, and the availability of spill response resources. This system is designed to meet the information needs of a Response Supervisor, an Environmental Advisor, Logistics/Maintenance Supervisor, Operations Supervisor, and the MSRC Regional General Manager. The SOS project Objectives are: (1) integrate currently available data, systems, and technologies; (2) develop an application that effectively supports mobilized operations and can be adapted to support normal operations; (3) ensure that the development of computer applications is driven by user needs and not by technology; and (4) coordinate with government and other industry organizations to avoid duplication of effort. Design Objectives for SOS are: (1) centralize management information storage while decentralizing decision making capabilities; (2) boost User confidence by providing a system that is easy to learn, easy to use, and is open-quotes Sailor Proofclose quotes; and (3) use visualization technology in providing spill related information. This approach includes the use of Geographic Information System (GIS) technology for maps and geographically associated resource; and support MSRC's concept of operation which includes - a swift notification of response personnel; fast mobilization of response resources; and accurate tracking of resources during a spill. MSRC is organized into five responsibility regions

  9. Operator reliability assessment system (OPERAS)

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Hallam, J.W.; Spurgin, J.P.; Singh, A.

    1991-01-01

    The paper gives an overview of the OPERAS project. It discusses the background which led to the design of the PC-based data collection and analysis system connected to plant training simulators including those used for nuclear power plants. The usefulness of a system like OPERAS was perceived during an earlier EPRI project, the Operator Reliability Experiments project, by EPRI and PG and E. The data collection and analysis approaches used in OPERAS were developed during the ORE project. The paper not only discusses the design of OPERAS but discusses the functions performed and the current experiences with the two prototype systems. Also listed are potential uses of OPERAS by utility personnel in Operations, Training and PRA groups

  10. ADAMS executive and operating system

    Science.gov (United States)

    Pittman, W. D.

    1981-01-01

    The ADAMS Executive and Operating System, a multitasking environment under which a variety of data reduction, display and utility programs are executed, a system which provides a high level of isolation between programs allowing them to be developed and modified independently, is described. The Airborne Data Analysis/Monitor System (ADAMS) was developed to provide a real time data monitoring and analysis capability onboard Boeing commercial airplanes during flight testing. It inputs sensor data from an airplane performance data by applying transforms to the collected sensor data, and presents this data to test personnel via various display media. Current utilization and future development are addressed.

  11. Safety analysis -- 200 Area Savannah River Plant, F-Canyon Operations. Supplement 4

    Energy Technology Data Exchange (ETDEWEB)

    Beary, M.M.; Collier, C.D.; Fairobent, L.A.; Graham, R.F.; Mason, C.L.; McDuffee, W.T.; Owen, T.L.; Walker, D.H.

    1986-02-01

    The F-Canyon facility is located in the 200 Separations Area and uses the Purex process to recover plutonium from reactor-irradiated uranium. The irradiated uranium is normally in the form of solid or hollow cylinders called slugs. These slugs are encased in aluminum cladding and are sent to the F-Canyon from the Savannah River Plant (SRP) reactor areas or from the Receiving Basin for Offsite Fuels (RBOF). This Safety Analysis Report (SAR) documents an analysis of the F-Canyon operations and is an update to a section of a previous SAR. The previous SAR documented an analysis of the entire 200 Separations Area operations. This SAR documents an analysis of the F-Canyon and is one of a series of documents for the Separations Area as specified in the Savannah River Implementation Plans. A substantial amount of the information supporting the conclusions of this SAR is found in the Systems Analysis. Some F-Canyon equipment has been updated during the time between the Systems Analysis and this SAR and a complete description of this equipment is included in this report. The primary purpose of the analysis was to demonstrate that the F-Canyon can be operated without undue risk to onsite or offsite populations and to the environment. In this report, risk is defined as the expected frequency of an accident, multiplied by the resulting radiological consequence in person-rem. The units of risk for radiological dose are person-rem/year. Maximum individual exposure values have also been calculated and reported.

  12. EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs

    Science.gov (United States)

    Cordier, Guy R.; Gomez-Rosa, Carlos; McLemore, Bruce D.

    2007-01-01

    The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.

  13. Operator reliability assessment system (OPERAS)

    International Nuclear Information System (INIS)

    Singh, A.; Spurgin, A.J.; Martin, T.; Welsch, J.; Hallam, J.W.

    1991-01-01

    OPERAS is a personal-computer (PC) based software to collect and process simulator data on control-room operators responses during requalification training scenarios. The data collection scheme is based upon approach developed earlier during the EPRI Operator Reliability Experiments project. The software allows automated data collection from simulator, thus minimizing simulator staff time and resources to collect, maintain and process data which can be useful in monitoring, assessing and enhancing the progress of crew reliability and effectiveness. The system is designed to provide the data and output information in the form of user-friendly charts, tables and figures for use by plant staff. OPERAS prototype software has been implemented at the Diablo Canyon (PWR) and Millstone (BWR) plants and is currently being used to collect operator response data. Data collected from similator include plant-state variables such as reactor pressure and temperature, malfunction, times at which annunciators are activated, operator actions and observations of crew behavior by training staff. The data and systematic analytical results provided by the OPERAS system can contribute to increase objectivity by the utility probabilistic risk analysis (PRA) and training staff in monitoring and assessing reliability of their crews

  14. 75 FR 55475 - Drawbridge Operation Regulation; Pequonnock River, Bridgeport, CT

    Science.gov (United States)

    2010-09-13

    ... removing the operation regulations for two moveable draw bridges that no longer have moveable spans. Under..., Connecticut. The moveable spans for both bridges were removed and the drawbridge operation regulations are no... operation of two bridges, the Congress Street Bridge at mile 0.4, and the Grand Street Bridge at mile 0.9...

  15. Capturing the Green River -- Multispectral airborne videography to evaluate the environmental impacts of hydropower operations

    International Nuclear Information System (INIS)

    Snider, M.A.; Hayse, J.W.; Hlohowskyj, I.; LaGory, K.E.

    1996-01-01

    The 500-mile long Green River is the largest tributary of the Colorado River. From its origin in the Wind River Range mountains of western Wyoming to its confluence with the Colorado River in southeastern Utah, the Green River is vital to the arid region through which it flows. Large portions of the area remain near-wilderness with the river providing a source of recreation in the form of fishing and rafting, irrigation for farming and ranching, and hydroelectric power. In the late 1950's and early 1960's hydroelectric facilities were built on the river. One of these, Flaming Gorge Dam, is located just south of the Utah-Wyoming border near the town of Dutch John, Utah. Hydropower operations result in hourly and daily fluctuations in the releases of water from the dam that alter the natural stream flow below the dam and affect natural resources in and along the river corridor. In the present study, the authors were interested in evaluating the potential impacts of hydropower operations at Flaming Gorge Dam on the downstream natural resources. Considering the size of the area affected by the daily pattern of water release at the dam as well as the difficult terrain and limited accessibility of many reaches of the river, evaluating these impacts using standard field study methods was virtually impossible. Instead an approach was developed that used multispectral aerial videography to determine changes in the affected parameters at different flows, hydrologic modeling to predict flow conditions for various hydropower operating scenarios, and ecological information on the biological resources of concern to assign impacts

  16. A Basin Approach to a Hydrological Service Delivery System in the Amur River Basin

    Directory of Open Access Journals (Sweden)

    Sergei Borsch

    2018-03-01

    Full Text Available This paper presents the basin approach to the design, development, and operation of a hydrological forecasting and early warning system in a large transboundary river basin of high flood potential, where accurate, reliable, and timely available daily water-level and reservoir-inflow forecasts are essential for water-related economic and social activities (the Amur River basin case study. Key aspects of basin-scale system planning and implementation are considered, from choosing efficient forecast models and techniques, to developing and operating data-management procedures, to disseminating operational forecasts using web-GIS. The latter, making the relevant forecast data available in real time (via Internet, visual, and well interpretable, serves as a good tool for raising awareness of possible floods in a large region with transport and industrial hubs located alongside the Amur River (Khabarovsk, Komsomolsk-on-Amur.

  17. Radium and barium in the Amazon River system

    International Nuclear Information System (INIS)

    Moore, W.S.; Edmond, J.M.

    1984-01-01

    Data for 226 Ra and 228 Ra in the Amazon River system show that the activity of each radium isotope is strongly correlated with barium concentrations. Two trends are apparent, one for rivers which drain shield areas and another for all other rivers. These data suggest that there has been extensive fractionation of U, Th, and Ba during weathering in the Amazon basin. The 226 Ra data fit a flux model for the major ions indicating that 226 Ra behaves conservatively along the main channel of the Amazon River

  18. A geomorphological characterisation of river systems in South Africa: A case study of the Sabie River

    Science.gov (United States)

    Eze, Peter N.; Knight, Jasper

    2018-06-01

    Fluvial geomorphology affects river character, behaviour, evolution, trajectory of change and recovery potential, and as such affects biophysical interactions within a catchment. Water bodies in South Africa, in common with many other water-stressed parts of the world, are generally under threat due to increasing natural and anthropogenic influences including aridity, siltation and pollution, as well as climate and environmental change. This study reports on a case study to characterise the geomorphology of different river systems in South Africa, with the aim of better understanding their properties, controls, and implications for biophysical interactions including water quality, biodiversity (aquatic and riparian), and human activity within the catchment. The approach adopted is based on the River Styles® framework (RSF), a geomorphology-based approach developed for rivers in New Zealand and Australia, but applied here for the first time to South Africa. Based on analysis of remote sensing imagery, SRTM-2 digital topographic data and field observations on sites through the entire river system, six geomorphic elements were identified along the Sabie River, northeast South Africa (gorge, bedrock-forced meander, low-moderate sinuosity planform controlled sand bed, meandering sand bed, low sinuosity fine grained sand bed, and floodouts), using the RSF classification scheme and based on the RSF procedural tree of Brierley and Fryirs (2005). Previous geomorphological studies along the Sabie River have shown that different reaches respond differently to episodic floods; we use these data to link river geomorphological character (as defined by the RSF) to the hydrodynamic conditions and processes giving rise to such character. This RSF approach can be used to develop a new management approach for river systems that considers their functional biophysical behaviour within individual reaches, rather than considering them as homogeneous and uniform systems.

  19. Improvement in operating incident experience at the Savannah River Burial Ground

    International Nuclear Information System (INIS)

    Cornman, W.R.

    1979-01-01

    Low-level radioactive wastes generated at the Savannah River Plant and Laboratory are stored at the Savannah River burial ground. These wastes have accumulated from >20 years of reprocessing nuclear fuels and materials for defense programs at the Savannah River Plant. Burial in earthen trenches and aboveground storage for transuranic materials are the principal modes of storage. The infrequent operating incidents that have occurred during the 20-year period have been analyzed. The incidents can be categorized as those causing airborne contamination, waterborne contamination, or vegetation contamination through penetration of plant roots into contaminated soil. Contamination was generally confined to the immediate area of the burial ground. Several incidents occurred because of unintentional burial or exhumation of material. The frequency of operating incidents decreased with operating experience of the burial ground, averaging only about two incidents per year during the last six years of operation

  20. Legislative impacts on Savannah River waste management operations

    International Nuclear Information System (INIS)

    Bauer, J.D.

    1987-01-01

    Today everyone has to be prepared to meet the challenges presented by new legislative actions. The Savannah River Plant is also impacted by this legislation as the exclusive nature of the Atomic Energy Act slowly erodes. This paper discusses the management of three types of radioactive waste from the production of defense nuclear materials and the impacts of major environmental legislation on the handling of these wastes. The paper briefly discusses the major environmental statutes, covers the statutes impact on the technical processes and, finally, considers the nontechnical impact of the statutes

  1. 78 FR 44881 - Drawbridge Operation Regulation; York River, Between Yorktown and Gloucester Point, VA

    Science.gov (United States)

    2013-07-25

    ... deviation from the operating schedule that governs the operation of the Coleman Memorial Bridge (US 17/George P. Coleman Memorial Swing Bridge) across the York River, mile 7.0, between Gloucester Point and Yorktown, VA. This deviation is necessary to facilitate maintenance work on the moveable spans on the...

  2. 76 FR 70384 - Drawbridge Operation Regulation; Black River, La Crosse, WI

    Science.gov (United States)

    2011-11-14

    ... two-hour notification. The proposed change is for drawspan operation by remote operator, opening..., Western Rivers, (314) 269-2378, email [email protected] . If you have questions on viewing or.... Viewing Comments and Documents To view comments, as well as documents mentioned in this preamble as being...

  3. 75 FR 17561 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-04-07

    ... issued a temporary deviation from the regulation governing the operations of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, Mile 482.9, Rock Island, Illinois. The deviation is... Manager, Docket Operations, telephone (202) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island...

  4. 78 FR 18933 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-03-28

    ... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Quad City Marathon..., Docket Operations, telephone (202) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal...

  5. 75 FR 22228 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-04-28

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, Mile 482.9, Rock Island, Illinois. The deviation is... Manager, Docket Operations, telephone (202) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island...

  6. 75 FR 68974 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-11-10

    ..., has issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois... Operations, telephone 202-366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a...

  7. Radionuclide releases to the Columbia River from Hanford Operations, 1944--1971

    International Nuclear Information System (INIS)

    Heeb, C.M.; Bates, D.J.

    1994-05-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of radionuclide emissions since 1944 from the Hanford Site. One source of radionuclide releases to the Columbia River was from production reactor operations. This report provides a quantitative estimate of the amount of radioactivity released each month (1944--1971) to the Columbia River from eleven radionuclides as well as from gross beta activity

  8. Trace element assessment in water of river kassa system, jos ...

    African Journals Online (AJOL)

    The value of index of geoaccumulation (Igeo) is approximately 2; for Zn and Pb which indicates, moderate contamination. Areas of the river system with anomalous value of trace element concentrations are those where mine tailings have been deposited close to the river channel or places where run off from adjoining ...

  9. GLUE Analysis and Optimal Operation for Diyala River Basin in Iraq Using Variable Infiltration Capacity Model

    Science.gov (United States)

    Waheed, S., Sr.; Ramirez, J.

    2017-12-01

    Uncertainty in both hydrologic behavior and model characterization is a concern for current and future water resource system planning, operation, and management. To develop optimal dam operation schemes under future uncertainty, the sensitivity of the precipitation-runoff response to changes in hydro-climatic forcing must be quantified. To achieve this purpose, accurate (observational and modeled) data should be implemented. Herein, many data sources were compared to representative hydrologic datasets. Due to limited availability of observed daily data, a random temporal cascade method was used to downscale the monthly precipitation into daily. Then, four interpolation methods were compared to transform the point into gridded data. Furthermore, a regression technique coupled with Kriging method was developed. The method is based on regressing modeled data (from VIC dataset) with the observed gridded temperature by relating the regression to the geometry of each grid. The sensitivity and identifiability of the Variable Infiltration Capacity model (VIC) for the Diyala River basin in Iraq were evaluated using GLUE technique. Diyala River is a Tigris River tributary in eastern Iraq. Its total length and basin area are about 216.5 km and 16,763.7 km2, respectively. Seven candidate parameters of VIC model (b_infilt, Ds, Ws, Dsmax, and depths of soil layer 1, 2, and 3) associated with the infiltration and surface runoff production processes are examined for 14000 random sets. The comparison between the different data showed that neither the observations from Tropical Rainfall Measurement Mission nor the VIC modeled data is accurate for gridded precipitation; therefore, a downscaling technique was applied. Moreover, the comparison between four different interpolation techniques revealed that the Kriging method is the most accurate. The optimal model performance was found to be 0.731 NSCE. Also, the GLUE analysis results implied that the depth of the second soil layer depth

  10. Diazotrophy in alluvial meadows of subarctic river systems.

    Directory of Open Access Journals (Sweden)

    Thomas H DeLuca

    Full Text Available There is currently limited understanding of the contribution of biological N2 fixation (diazotrophy to the N budget of large river systems. This natural source of N in boreal river systems may partially explain the sustained productivity of river floodplains in Northern Europe where winter fodder was harvested for centuries without fertilizer amendments. In much of the world, anthropogenic pollution and river regulation have nearly eliminated opportunities to study natural processes that shaped early nutrient dynamics of large river systems; however, pristine conditions in northern Fennoscandia allow for the retrospective evaluation of key biochemical processes of historical significance. We investigated biological N2 fixation (diazotrophy as a potential source of nitrogen fertility at 71 independent floodplain sites along 10 rivers and conducted seasonal and intensive analyses at a subset of these sites. Biological N2 fixation occurred in all floodplains, averaged 24.5 kg N ha(-1 yr(-1 and was down regulated from over 60 kg N ha(-1 yr(-1 to 0 kg N ha(-1 yr(-1 by river N pollution. A diversity of N2-fixing cyanobacteria was found to colonize surface detritus in the floodplains. The data provide evidence for N2 fixation to be a fundamental source of new N that may have sustained fertility at alluvial sites along subarctic rivers. Such data may have implications for the interpretation of ancient agricultural development and the design of contemporary low-input agroecosystems.

  11. Preliminary checklists for applying SERCON (System for Evaluating Rivers for Conservation to rivers in Serbia

    Directory of Open Access Journals (Sweden)

    Teodorović Ivana

    2012-01-01

    Full Text Available This paper describes the first steps in gathering biological data to assess the conservation value of rivers in Serbia, using SERCON (System for Evaluating Rivers for Conservation. SERCON was developed in the UK to improve consistency in assessments of river ‘quality’ by using a scoring system to evaluate habitat features and species groups, catchment characteristics, and the potential impacts to which river systems may be subjected. This paper provides checklists for aquatic, semiaquatic and marginal plants, macroinvertebrates, fish and birds associated with rivers in Serbia, collated from a wide range of published and unpublished sources. These lists should be regarded as provisional because few wide-ranging biological surveys have been carried out specifically on Serbian rivers; further revisions are likely as more information becomes available in future. Ultimately, the work will benefit regulators and decision-makers with responsibility for river management under the new Water Law, and contribute to river protection and conservation in Serbia. [Acknowledgments. The hydromorphology dataset was prepared for the project ‘Biosensing Technologies and Global System for Long-Term Research and Integrated Management of Ecosystems’ (Biosensing tehnologije i globalni sistem za kontinuirana istraživanja i integrisano upravljanje ekosistema III 043002 grant, while the biodiversity dataset was prepared the project Plant biodiversity of Serbia and the Balkans – assessment, sustainable use and protection (Biodiverzitet biljnog sveta Srbije i Balkanskog poluostrva – procena, održivo korišćenje i zaštita 173030 Grant, supported by Ministry of Education and Science, Republic of Serbia

  12. Outsourcing critical financial system operations.

    Science.gov (United States)

    Cox, Nora; Pilbauer, Jan

    2018-01-01

    Payments Canada provides Canada's national payments systems and is responsible for the clearing and settlement infrastructure, processes and rules that underpin the exchange of billions of dollars each day through the Canadian economy. Strategic sourcing is a reality for this small organisation with a broad scope of national regulations and global standards to comply with. This paper outlines Payments Canada's approach to outsourcing its critical financial system operations, which centres on four key principles: strong relationship management; continuous learning, recording and reporting; evaluating the business landscape; and a commitment to evolving the organisation to greater resilience. This last point is covered in detail with an exploration of the organisation's resilience and security strategy as well as its risk appetite. As Payments Canada progresses to its future state, which includes modernising its core payment systems, underlying rules and standards, risk management for the industry as a whole will remain at the forefront of its collective mind. The expectation is that outsourcing will remain a fundamental element of its operating model in future, a strategy that will ensure the organisation can focus on its core business competencies and eliminate the need to develop and support in-house expertise in commodity areas.

  13. Reliability evaluation of the Savannah River reactor leak detection system

    International Nuclear Information System (INIS)

    Daugherty, W.L.; Sindelar, R.L.; Wallace, I.T.

    1991-01-01

    The Savannah River Reactors have been in operation since the mid-1950's. The primary degradation mode for the primary coolant loop piping is intergranular stress corrosion cracking. The leak-before-break (LBB) capability of the primary system piping has been demonstrated as part of an overall structural integrity evaluation. One element of the LBB analyses is a reliability evaluation of the leak detection system. The most sensitive element of the leak detection system is the airborne tritium monitors. The presence of small amounts of tritium in the heavy water coolant provide the basis for a very sensitive system of leak detection. The reliability of the tritium monitors to properly identify a crack leaking at a rate of either 50 or 300 lb/day (0.004 or 0.023 gpm, respectively) has been characterized. These leak rates correspond to action points for which specific operator actions are required. High reliability has been demonstrated using standard fault tree techniques. The probability of not detecting a leak within an assumed mission time of 24 hours is estimated to be approximately 5 x 10 -5 per demand. This result is obtained for both leak rates considered. The methodology and assumptions used to obtain this result are described in this paper. 3 refs., 1 fig., 1 tab

  14. Migration of radionuclides through a river system

    Energy Technology Data Exchange (ETDEWEB)

    Matsunaga, Takeshi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1999-03-01

    Migration behavior of several atmospherically-derived radionuclides in a river watershed was studied. A main interest was in their relocation from the ground soil of the watershed to a downstream region through a river. Studied radionuclides are: {sup 137}Cs generated by weapon tests in the atmosphere; {sup 210}Pb and {sup 7}Be of naturally occurring radionuclides; {sup 137}Cs, {sup 90}Sr, {sup 239,240}Pu and {sup 241}Am released by the Chernobyl nuclear power plant accident. Dominance of the form in suspended solid in river water (particulate form) was qualified for the radionuclides in the Kuji river watershed. An importance of discharge in flooding was also confirmed. A historical budget analysis for weapon test derived {sup 137}Cs was presented for the Hi-i river watershed and its accompanied lake sediment (Lake Shinji). The work afforded a scheme of a fate of {sup 137}Cs after falling on the ground soil and on the lake surface. Several controlling factors, which can influence on the chemical form of radionuclides discharged to a river, were also investigated in the vicinity of the Chernobyl nuclear power plant. A special attention was paid on the association of the radionuclides with dissolved species in water. Preferential association of Pu and Am isotopes to a large molecular size of dissolved matrices, probably of humic substances, was suggested. (author)

  15. Biogeochemistry of mercury in a river-reservoir system: impact of an inactive chloralkali plant on the Holston River-Cherokee Reservoir, Virginia and Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S. G.; Lindberg, S. E.; Turner, R. R.; Huckabee, J. W.; Strand, R. H.; Lund, J. R.; Andren, A. W.

    1980-08-01

    Elevated mercury concentrations in fish species from the North Fork of the Holston River were observed in the early 1970's. The source of the mercury was a chloralkali plant which had ceased operation in 1972. Mercury continues to be released to the river from two large (approx. 40-ha) waste disposal ponds at the plant site. This report presents results of a study of the emission of mercury to the environment from the abandoned waste ponds and of the distribution of mercury in water, sediment, and biota of the Holston River-Cherokee Reservoir System in Virginia and eastern Tennessee.

  16. Impacts of hydropower operation on water supply from lower Colorado River in Texas

    International Nuclear Information System (INIS)

    Martin, Q.W.

    1993-01-01

    The Lower Colorado River Authority (LCRA) of Texas is both a water and energy supplier to a large area of Central Texas. LCRA generates approximately 10 percent of its power from hydroelectric power plants on the six dams in the Highland Lakes system of reservoirs. To improve power production, LCRA has investigated alternative operating procedures to increase the winter scheduling of hydroelectric power generation in the upper reservoirs of the Highland Lakes system without adversely impacting available water supplies. A methodology using both optimization and simulation techniques was developed to evaluate the ability of the hydroelectric facilities to meet weather-related winter peaking requirements. A linear programming procedure determined the hourly power generation schedule, over a 24 hour period, that maximized the total amount of power generated over the six hours of peak power demand. The full installed capacity was found to be available during the peak hours without violating system operating constraints including water storage limits at the individual lakes. Based on statistical simulation of daily winter inflows and releases using a LOTUS 1-2-3 spreadsheet, it was found that the full generating capacity could be supplied to meet the weather-related peak winter power demand with no significant impact on water availability

  17. Microsoft Windows Operating System Essentials

    CERN Document Server

    Carpenter, Tom

    2012-01-01

    A full-color guide to key Windows 7 administration concepts and topics Windows 7 is the leading desktop software, yet it can be a difficult concept to grasp, especially for those new to the field of IT. Microsoft Windows Operating System Essentials is an ideal resource for anyone new to computer administration and looking for a career in computers. Delving into areas such as fundamental Windows 7 administration concepts and various desktop OS topics, this full-color book addresses the skills necessary for individuals looking to break into a career in IT. Each chapter begins with a list of topi

  18. Benchmarking wide swath altimetry-based river discharge estimation algorithms for the Ganges river system

    Science.gov (United States)

    Bonnema, Matthew G.; Sikder, Safat; Hossain, Faisal; Durand, Michael; Gleason, Colin J.; Bjerklie, David M.

    2016-04-01

    The objective of this study is to compare the effectiveness of three algorithms that estimate discharge from remotely sensed observables (river width, water surface height, and water surface slope) in anticipation of the forthcoming NASA/CNES Surface Water and Ocean Topography (SWOT) mission. SWOT promises to provide these measurements simultaneously, and the river discharge algorithms included here are designed to work with these data. Two algorithms were built around Manning's equation, the Metropolis Manning (MetroMan) method, and the Mean Flow and Geomorphology (MFG) method, and one approach uses hydraulic geometry to estimate discharge, the at-many-stations hydraulic geometry (AMHG) method. A well-calibrated and ground-truthed hydrodynamic model of the Ganges river system (HEC-RAS) was used as reference for three rivers from the Ganges River Delta: the main stem of Ganges, the Arial-Khan, and the Mohananda Rivers. The high seasonal variability of these rivers due to the Monsoon presented a unique opportunity to thoroughly assess the discharge algorithms in light of typical monsoon regime rivers. It was found that the MFG method provides the most accurate discharge estimations in most cases, with an average relative root-mean-squared error (RRMSE) across all three reaches of 35.5%. It is followed closely by the Metropolis Manning algorithm, with an average RRMSE of 51.5%. However, the MFG method's reliance on knowledge of prior river discharge limits its application on ungauged rivers. In terms of input data requirement at ungauged regions with no prior records, the Metropolis Manning algorithm provides a more practical alternative over a region that is lacking in historical observations as the algorithm requires less ancillary data. The AMHG algorithm, while requiring the least prior river data, provided the least accurate discharge measurements with an average wet and dry season RRMSE of 79.8% and 119.1%, respectively, across all rivers studied. This poor

  19. 75 FR 38411 - Drawbridge Operation Regulations; Chelsea River, Chelsea and East Boston, MA, Event-Road Race

    Science.gov (United States)

    2010-07-02

    ... Operation Regulations; Chelsea River, Chelsea and East Boston, MA, Event--Road Race AGENCY: Coast Guard, DHS... is necessary to facilitate a public event, the Chelsea River Revel 5K Road Race. DATES: This... public event, the Chelsea River Revel 5K Road Race. This deviation allows the bridge to remain closed...

  20. Reservoir operation schemes for water pollution accidents in Yangtze River

    Directory of Open Access Journals (Sweden)

    Xiao-kang Xin

    2012-03-01

    Full Text Available After the Three Gorges Reservoir starts running, it can not only take into consideration the interest of departments such as flood control, power generation, water supply, and shipping, but also reduce or eliminate the adverse effects of pollutants by discharge regulation. The evolution of pollutant plumes under different operation schemes of the Three Gorges Reservoir and three kinds of pollutant discharge types were calculated with the MIKE 21 AD software. The feasibility and effectiveness of the reservoir emergency operation when pollution accidents occur were investigated. The results indicate that the emergency operation produces significant effects on the instantaneous discharge type with lesser effects on the constant discharge type, the impact time is shortened, and the concentration of pollutant is reduced. Meanwhile, the results show that the larger the discharge is and the shorter the operation duration is, the more favorable the result is.

  1. SNAP operating system reference manual

    International Nuclear Information System (INIS)

    Sabuda, J.D.; Polito, J.; Walker, J.L.; Grant, F.H. III.

    1982-03-01

    The SNAP Operating System (SOS) is a FORTRAN 77 program which provides assistance to the safeguards analyst who uses the Safeguards Automated Facility Evaluation (SAFE) and the Safeguards Network Analysis Procedure (SNAP) techniques. Features offered by SOS are a data base system for storing a library of SNAP applications, computer graphics representation of SNAP models, a computer graphics editor to develop and modify SNAP models, a SAFE-to-SNAP interface, automatic generation of SNAP input data, and a computer graphic post-processor for SNAP. The SOS Reference Manual provides detailed application information concerning SOS as well as a detailed discussion of all SOS components and their associated command input formats. SOS was developed for the US Nuclear Regulatory Commission's Office of Nuclear Regulatory Research and the US Naval Surface Weapons Center by Pritsker and Associates, Inc., under contract to Sandia National Laboratories

  2. Incentivizing Flexibility in System Operations

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, Michael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bloom, Aaron P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Townsend, Aaron [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ela, Erik [Electric Power Research Institute; Botterud, Audun [Argonne National Laboratory; Levin, Todd [Argonne National Laboratory

    2018-02-15

    Defining flexibility has been a challenge that a number of industry members and researchers have attempted to address in recent years. With increased variability and uncertainty of variable generation (VG), the resources on the system will have to be more flexible to adjust output, so that power output ranges, power ramp rates, and energy duration sustainability are sufficient to meet the needs of balancing supply with demand at various operational timescales. This chapter discusses whether existing market designs provide adequate incentives for resources to offer their flexibility into the market to meet the increased levels of variability and uncertainty introduced by VG in the short-term operational time frame. It presents a definition of flexibility and discusses how increased levels of VG require increased needs for flexibility on power systems. Following this introductory material, the chapter examines how existing market designs ensure that resources have the right incentives to provide increased flexibility, and then discusses a number of emerging market design elements that impact flexibility incentives.

  3. Smart Cards and Card Operating Systems

    NARCIS (Netherlands)

    Hartel, Pieter H.; Bartlett, J.; de Jong, Eduard K.

    The operating system of an IC card should provide an appropriate interface to applications using IC cards. An incorrect choice of operations and data renders the card inefficient and cumbersome. The design principles of the UNIX operating system are most appropriate for IC card operating system

  4. Advanced Space Surface Systems Operations

    Science.gov (United States)

    Huffaker, Zachary Lynn; Mueller, Robert P.

    2014-01-01

    The importance of advanced surface systems is becoming increasingly relevant in the modern age of space technology. Specifically, projects pursued by the Granular Mechanics and Regolith Operations (GMRO) Lab are unparalleled in the field of planetary resourcefulness. This internship opportunity involved projects that support properly utilizing natural resources from other celestial bodies. Beginning with the tele-robotic workstation, mechanical upgrades were necessary to consider for specific portions of the workstation consoles and successfully designed in concept. This would provide more means for innovation and creativity concerning advanced robotic operations. Project RASSOR is a regolith excavator robot whose primary objective is to mine, store, and dump regolith efficiently on other planetary surfaces. Mechanical adjustments were made to improve this robot's functionality, although there were some minor system changes left to perform before the opportunity ended. On the topic of excavator robots, the notes taken by the GMRO staff during the 2013 and 2014 Robotic Mining Competitions were effectively organized and analyzed for logistical purposes. Lessons learned from these annual competitions at Kennedy Space Center are greatly influential to the GMRO engineers and roboticists. Another project that GMRO staff support is Project Morpheus. Support for this project included successfully producing mathematical models of the eroded landing pad surface for the vertical testbed vehicle to predict a timeline for pad reparation. And finally, the last project this opportunity made contribution to was Project Neo, a project exterior to GMRO Lab projects, which focuses on rocket propulsion systems. Additions were successfully installed to the support structure of an original vertical testbed rocket engine, thus making progress towards futuristic test firings in which data will be analyzed by students affiliated with Rocket University. Each project will be explained in

  5. Safety analysis, 200 Area, Savannah River Plant H-Canyon operations. Supplement 5

    Energy Technology Data Exchange (ETDEWEB)

    Beary, M M; Collier, C D; Fairobent, L A; Graham, R F; Mason, C L; McDuffee, W T; Owen, T L; Walker, D H [Science Applications International Corp., San Diego, CA (United States)

    1986-02-01

    The H-Canyon facility is located in the 200 Separations Area and uses the HM process to separate uranium, neptunium, plutonium, and fission products. Irradiated uranium fuels containing {sup 235}U at enrichments from 1.1% to 94% are processed and recovered, along with neptunium and plutonium isotopes. This Safety Analysis Report (SAR) documents an analysis of the H-Canyon operations and is an update to a section of a previous SAR. This SAR documents an analysis of the H-Canyon and is one of a series of documents for the Separations Area as specified in the Savannah River Implementation Plans. A substantial amount of the information supporting the Conclusions of this SAR is found in the Systems Analysis. Some H-Canyon equipment has been updated during the time between the Systems Analysis and this SAR and a complete description of this equipment is included in this report. The primary purpose of the analysis was to demonstrate that the H-Carbon can be operated without due risk to onsite or offsite populations and to the environment. In this report, risk is defined an the expected frequency of an accident, multiplied by the resulting radiological consequence in person-rem. The units of risk for radiological does are person-rem/year. Maximum individual exposure values have also been calculated and reported.

  6. Reactor core operation management system

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Tomomi.

    1992-05-28

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.).

  7. Reactor core operation management system

    International Nuclear Information System (INIS)

    Sato, Tomomi.

    1992-01-01

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.)

  8. River system recovery following the Novat-Rosu tailings dam failure, Maramures County, Romania

    International Nuclear Information System (INIS)

    Bird, Graham; Brewer, Paul A.; Macklin, Mark G.; Balteanu, Dan; Serban, Mihaela; Driga, Basarab; Zaharia, Sorin

    2008-01-01

    The River Viseu catchment in Maramures County, northwestern Romania, has a long history of base and precious metal mining. Between 1994 and 2003 waste from mining activity at Baia Borsa was stored in the Novat-Rosu tailings pond in the upper Viseu catchment. However, in March 2000, the tailings dam failed releasing approximately 100,000 m 3 of contaminated water and 20,000 t of mineral-rich solid waste, which was routed downstream through the Rivers Novat, Vaser and Viseu into the River Tisa. Following the accident metal (Cd, Cu, Pb, Zn) concentrations in river water and river channel sediment were assessed in samples collected annually (July 2000, 2001, 2002 and 2003) from 29 sites in the Viseu catchment, downstream of the tailings pond. Additionally, the speciation of sediment-associated metals was established using a 4-stage sequential extraction procedure (SEP) and Pb isotope analysis ( 206/204 Pb and 207/204 Pb) was carried out to establish the provenance of contaminated sediments. Metal concentrations in river water were found to comply with EU directive 'target' values within four months of the failure. However, the impact of the spill upon river channel sediments was found to be much longer-lasting, with evidence of the delayed downstream remobilization of tailings stored within the narrow Novat valley following the dam failure, as well as continued inputs of contaminated sediment to the River Viseu from the River Tisla, another mining-affected tributary. Comparison with data from other recent tailings dam failures, indicates that river system recovery rates depend upon local geomorphological conditions, hydrological regimes, and the nature and scale of post-spill clean-up operations

  9. Oldman river dam mitigation program downstream vegetation project report, Volume II: The potential effects of an operating plan for the Oldman River dam on Riparian cottonwood forests

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, J.M.

    1993-01-01

    Extensive cottonwood (poplar) forests exist in the Oldman River valley downstream of the Oldman River dam. Studies of similar forests in nearby river valleys and elsewhere on the western prairies have found significant declines of some riparian forests following river damming. This investigation was initiated to determine the causes of cottonwood forest decline downstream from existing dams in southern Alberta; inventory the existing river valley forests in the Oldman Basin; establish study sites in the Oldman River forests to monitor changes in forest status following commissioning of the Oldman River dam, and evaluate the probable impact of proposed operating plans for the Oldman River dam and associated water control structures on downstream forests. This report summarizes the progress made in the analyses of the probable effects on the survival of the forests, including a discussion of the hydrological conditions essential for cottonwood forest regeneration and an explanation of the effects of altering these characteristics on riparian forests; the hydrological alterations expected along various river reaches in the Oldman Basin with the implementation of the proposed OD05 Oldman Dam operating plan; and preliminary analyses of the problem impacts of the OD05 operating plan on the cottonwood forests along these reaches.

  10. 75 FR 76322 - Drawbridge Operation Regulation; Fox River, Oshkosh, WI

    Science.gov (United States)

    2010-12-08

    ... required to maintain and operate a marine radiotelephone, along with equipment to visually monitor the... the waterway. If you think that your business, organization, or governmental jurisdiction qualifies as... comment (see ADDRESSES) explaining why you think it qualifies and how and to what degree this rule would...

  11. 76 FR 52566 - Drawbridge Operation Regulations; Anacostia River, Washington, DC

    Science.gov (United States)

    2011-08-23

    ...- 6629, e-mail [email protected] . If you have questions on viewing or submitting material to... material received during the comment period and may change the rule based on your comments. Viewing... in August 2004 and allows the bridge to be operated from a remote location, the Benning Yard office...

  12. 75 FR 81176 - Drawbridge Operation Regulation; Rainey River, Rainer, MN

    Science.gov (United States)

    2010-12-27

    ... have questions on viewing or submitting material to the docket, call Renee V. Wright, Program Manager... rule based on your comments. Viewing Comments and Documents To view comments, as well as documents... District, to be operated from a remote location. The Coast Guard has recently been informed that the...

  13. 77 FR 16928 - Drawbridge Operation Regulation; Miami River, Miami, FL

    Science.gov (United States)

    2012-03-23

    ...,'' and then click on the balloon shape in the ``Actions'' column. If you submit your comments [[Page... N.W. 12th Avenue Bridge provides a vertical clearance of 22 feet above mean high water in the closed position, and a horizontal clearance of 150 feet. The normal operating schedule for the bridge is set forth...

  14. 77 FR 47792 - Drawbridge Operation Regulation; Schuylkill River, Philadelphia, PA

    Science.gov (United States)

    2012-08-10

    ... high tide in the closed position and unlimited in the open position. The current operating schedule for... Indian tribes. Energy Effects This proposed rule is not a ``significant energy action'' under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or...

  15. Plant operation state monitoring system

    International Nuclear Information System (INIS)

    Sakai, Masanori; Babuchi, Katsumi; Arato, Toshiaki

    1994-01-01

    The system of the present invention accurately monitors a plant operation state of a plant, such as a nuclear power plant and a thermal power plant by using high temperature water, based on water quality informations. That is, water quality informations for the objective portion by using an electrochemical water quality sensor disposed in the objective portion to be monitored in the plant are continuously extracted for a predetermined period of time. Water quality is evaluated based on the extracted information. Obtained results for water quality evaluation and predetermined reference values of the plant operation handling are compared. Necessary part among the results of the measurement is displayed or recorded. The predetermined period of time described above is a period that the water quality information reaches at least a predetermined value or a period that the predetermined value is estimated by the water quality information, and it is defined as a period capable of measuring the information for three months continuously. The measurement is preferably conducted continuously in a period up to each periodical inspection on about every one year. (I.S.)

  16. 78 FR 18849 - Drawbridge Operation Regulations; Saugus River, Saugus and Lynn, MA

    Science.gov (United States)

    2013-03-28

    ... regulation governing the operation of the Route 107 temporary bridge across the Saugus River, mile 2.5, between Saugus and Lynn, Massachusetts. The bridge will not open for vessel traffic during the installation of the moveable span. This deviation allows the bridge to remain closed for six days. DATES: This...

  17. 77 FR 69761 - Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA

    Science.gov (United States)

    2012-11-21

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2012-0995] Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Coast Guard has issued a temporary deviation from the...

  18. 75 FR 1706 - Drawbridge Operation Regulations; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2010-01-13

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket Number USCG-2009-1097] Drawbridge Operation Regulations; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District has...

  19. 75 FR 76279 - Drawbridge Operation Regulation; Upper Mississippi River, Burlington, IA

    Science.gov (United States)

    2010-12-08

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-1058] Drawbridge Operation Regulation; Upper Mississippi River, Burlington, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  20. 78 FR 72022 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2013-12-02

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2013-0964] Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from drawbridge regulation. SUMMARY: The Coast Guard has issued a temporary deviation from the...

  1. 76 FR 79066 - Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA

    Science.gov (United States)

    2011-12-21

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2011-1018] Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  2. 76 FR 72308 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2011-11-23

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2011-1039] Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  3. 78 FR 76750 - Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2013-1008] Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from drawbridge regulations. SUMMARY: The Coast Guard has issued a temporary deviation from the...

  4. 75 FR 70817 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2010-11-19

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-1039] Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  5. 75 FR 78162 - Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA

    Science.gov (United States)

    2010-12-15

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-1084] Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  6. 77 FR 69759 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2012-11-21

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2012-1002] Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Coast Guard has issued a temporary deviation from the...

  7. 76 FR 6694 - Drawbridge Operation Regulation; Upper Mississippi River, Keokuk, IA

    Science.gov (United States)

    2011-02-08

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket Number USCG-2011-0029] Drawbridge Operation Regulation; Upper Mississippi River, Keokuk, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has...

  8. 76 FR 12 - Drawbridge Operation Regulations; New Haven Harbor, Quinnipiac and Mill Rivers, New Haven, CT

    Science.gov (United States)

    2011-01-03

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-1096] Drawbridge Operation Regulations; New Haven Harbor, Quinnipiac and Mill Rivers, New Haven, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, First Coast Guard...

  9. 76 FR 50123 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2011-08-12

    ... temporary deviation from the regulation governing the operation of the Hack Freight Bridge, mile 3.1, across...-9826. SUPPLEMENTARY INFORMATION: The Hack Freight Bridge, across the Hackensack River at mile 3.1 has a... to provide openings. Under this temporary deviation the Hack Freight Bridge, mile 3.1, across the...

  10. 77 FR 20716 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-04-06

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  11. 77 FR 3607 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-01-25

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  12. 78 FR 79312 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-12-30

    ... deviation from the operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow.... Army Rock Island Arsenal requested a temporary deviation for the Rock Island Railroad and Highway...

  13. 76 FR 9223 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2011-02-17

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  14. 77 FR 5398 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-02-03

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  15. 76 FR 9224 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2011-02-17

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation.... SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation for the Rock Island...

  16. System Planning With The Hanford Waste Operations Simulator

    International Nuclear Information System (INIS)

    Crawford, T.W.; Certa, P.J.; Wells, M.N.

    2010-01-01

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  17. Kyiv Small Rivers in Metropolis Water Objects System

    Science.gov (United States)

    Krelshteyn, P.; Dubnytska, M.

    2017-12-01

    The article answers the question, what really are the small underground rivers with artificial watercourses: water bodies or city engineering infrastructure objects? The place of such rivers in metropolis water objects system is identified. The ecological state and the degree of urbanization of small rivers, as well as the dynamics of change in these indicators are analysed on the Kiev city example with the help of water objects cadastre. It was found that the registration of small rivers in Kyiv city is not conducted, and the summary information on such water objects is absent and is not taken into account when making managerial decisions at the urban level. To solve this problem, we propose to create some water bodies accounting system (water cadastre).

  18. Process pump operating problems and equipment failures, F-Canyon Reprocessing Facility, Savannah River Plant

    International Nuclear Information System (INIS)

    Durant, W.S.; Starks, J.B.; Galloway, W.D.

    1987-02-01

    A compilation of operating problems and equipment failures associated with the process pumps in the Savannah River Plant F-Canyon Fuel Reprocessing Facility is presented. These data have been collected over the 30-year operation of the facility. An analysis of the failure rates of the pumps is also presented. A brief description of the pumps and the data bank from which the information was sorted is also included

  19. Nuclear power plant operational data compilation system

    International Nuclear Information System (INIS)

    Silberberg, S.

    1980-01-01

    Electricite de France R and D Division has set up a nuclear power plant operational data compilation system. This data bank, created through American documents allows results about plant operation and operational material behaviour to be given. At present, French units at commercial operation are taken into account. Results obtained after five years of data bank operation are given. (author)

  20. Upper Rio Grande water operations model: A tool for enhanced system management

    Science.gov (United States)

    Gail Stockton; D. Michael Roark

    1999-01-01

    The Upper Rio Grande Water Operations Model (URGWOM) under development through a multi-agency effort has demonstrated capability to represent the physical river/reservoir system, to track and account for Rio Grande flows and imported San Juan flows, and to forecast flows at various points in the system. Testing of the Rio Chama portion of the water operations model was...

  1. Ichtyocoenosis of a section of the Jihlava river influenced by the Dukovany-Dalesice power system

    International Nuclear Information System (INIS)

    Penaz, M.; Wohlgemuth, E.

    1990-01-01

    The impact was investigated of the construction and operation of a hydropower station with two deep valley reservoirs and subsequently of a nuclear power station whose water management is closely associated with the river ecosystem, upon the ichthyocoenosis of the downstream river section. The initial quantitative and species composition of the ichthyocoenosis, being descriptive for the barbel zone community, changed into the community of the salmonid type, characteristic of the trout and grayling zones. This process was spontaneous as well as caused by the activity of fish management. The development of fishery catches in the past 30 years and their changes due to the operation of the power system are also analyzed in detail. After a temporary decrease, the annual mean fishery yields improved significantly in the affected river section, not only in their absolute weights but also in terms of the sport and market value of the fish caught. (author). 3 figs., 2 tabs., 22 refs

  2. Osprey: Operating system for predictable clouds

    NARCIS (Netherlands)

    Sacha, Jan; Napper, Jeff; Mullender, Sape J.; McKie, Jim

    2012-01-01

    Cloud computing is currently based on hardware virtualization wherein a host operating system provides a virtual machine interface nearly identical to that of physical hardware to guest operating systems. Full transparency allows backward compatibility with legacy software but introduces

  3. Operating-System Support for Distributed Multimedia

    NARCIS (Netherlands)

    Mullender, Sape J.; Leslie, Ian M.; McAuley, Derek

    1994-01-01

    Multimedia applications place new demands upon processors, networks and operating systems. While some network designers, through ATM for example, have considered revolutionary approaches to supporting multimedia, the same cannot be said for operating systems designers. Most work is evolutionary in

  4. Long-term changes in river system hydrology in Texas

    Directory of Open Access Journals (Sweden)

    Y. Zhang

    2018-06-01

    Full Text Available Climate change and human actives are recognized as a topical issue that change long-term water budget, flow-frequency, and storage-frequency characteristics of different river systems. Texas is characterized by extreme hydrologic variability both spatially and temporally. Meanwhile, population and economic growth and accompanying water resources development projects have greatly impacted river flows throughout Texas. The relative effects of climate change, water resources development, water use, and other factors on long-term changes in river flow, reservoir storage, evaporation, water use, and other components of the water budgets of different river basins of Texas have been simulated in this research using the monthly version of the Water Rights Analysis Package (WRAP modelling system with input databases sets from the Texas Commission on Environmental Quality (TCEQ and Texas Water Development Board (TWDB. The results show that long-term changes are minimal from analysis monthly precipitation depths. Evaporation rates vary greatly seasonally and for much of the state appear to have a gradually upward trend. River/reservoir system water budgets and river flow characteristics have changed significantly during the past 75 years in response to water resources development and use.

  5. Evaluation of HIV Surveillance System in Rivers State, Nigeria ...

    African Journals Online (AJOL)

    Background: Rivers State has been reported to have the highest HIV prevalence of all the thirty-six states in Nigeria. HIV surveillance system generates information for timely and appropriate public health action. Evaluation of the surveillance system is vital in ensuring that the purpose of the surveillance system is being met.

  6. Intelligent operation system for nuclear power plants

    International Nuclear Information System (INIS)

    Morioka, Toshihiko; Fukumoto, Akira; Suto, Osamu; Naito, Norio.

    1987-01-01

    Nuclear power plants consist of many systems and are operated by skillful operators with plenty of knowledge and experience of nuclear plants. Recently, plant automation or computerized operator support systems have come to be utilized, but the synthetic judgment of plant operation and management remains as human roles. Toshiba is of the opinion that the activities (planning, operation and maintenance) should be integrated, and man-machine interface should be human-friendly. We have begun to develop the intelligent operation system aiming at reducing the operator's role within the fundamental judgment through the use of artificial intelligence. (author)

  7. Assessment of denitrification process in lower Ishikari river system, Japan.

    Science.gov (United States)

    Jha, Pawan Kumar; Minagawa, Masao

    2013-11-01

    Sediment denitrification rate and its role in removal of dissolved nitrate load in lower Ishikari river system were examined. Denitrification rate were measured using acetylene inhibition technique on the sediment samples collected during August 2009-July 2010. The denitrification rate varied from 0.001 to 1.9 μg Ng(-1) DM h(-1) with an average value of 0.21 μg Ng(-1) DM h(-1) in lower Ishikari river system. Denitrification rate showed positive correlation with dissolved nitrate concentration in the river basin, indicating overlying water column supplied nitrate for the sediment denitrification processes. Nutrient enrichment experiments result showed that denitrification rate increased significantly with addition of nitrate in case of samples collected from Barato Lake however no such increase was observed in the samples collected from Ishikari river main channel and its major tributaries indicating that factors other than substrate concentration such as population of denitrifier and hydrological properties of stream channel including channel depth and flow velocity may affects the denitrification rate in lower Ishikari river system. Denitrification rate showed no significant increase with the addition of labile carbon (glucose), indicating that sediment samples had sufficient organic matter to sustain denitrification activity. The result of nutrient spiraling model indicates that in- stream denitrification process removes on an average 5%d(-1) of dissolve nitrate load in Ishikari river. This study was carried out to fill the gap present in the availability of riverine denitrification rate measurement and its role in nitrogen budget from Japanese rivers characterize by small river length and high flow rate. Copyright © 2013 Elsevier Ltd. All rights reserved.

  8. 78 FR 49918 - Drawbridge Operation Regulation; Taunton River, Fall River and Somerset, MA

    Science.gov (United States)

    2013-08-16

    ..., or Use. 13. Technical Standards The National Technology Transfer and Advancement Act (NTTAA) (15 U.S..., Docket Operations, telephone 202- 366-9826. SUPPLEMENTARY INFORMATION: A. Regulatory History and... small entities during rulemaking. The Coast Guard received no comments from the Small Business...

  9. An advanced modelling tool for simulating complex river systems.

    Science.gov (United States)

    Trancoso, Ana Rosa; Braunschweig, Frank; Chambel Leitão, Pedro; Obermann, Matthias; Neves, Ramiro

    2009-04-01

    The present paper describes MOHID River Network (MRN), a 1D hydrodynamic model for river networks as part of MOHID Water Modelling System, which is a modular system for the simulation of water bodies (hydrodynamics and water constituents). MRN is capable of simulating water quality in the aquatic and benthic phase and its development was especially focused on the reproduction of processes occurring in temporary river networks (flush events, pools formation, and transmission losses). Further, unlike many other models, it allows the quantification of settled materials at the channel bed also over periods when the river falls dry. These features are very important to secure mass conservation in highly varying flows of temporary rivers. The water quality models existing in MOHID are base on well-known ecological models, such as WASP and ERSEM, the latter allowing explicit parameterization of C, N, P, Si, and O cycles. MRN can be coupled to the basin model, MOHID Land, with computes runoff and porous media transport, allowing for the dynamic exchange of water and materials between the river and surroundings, or it can be used as a standalone model, receiving discharges at any specified nodes (ASCII files of time series with arbitrary time step). These features account for spatial gradients in precipitation which can be significant in Mediterranean-like basins. An interface has been already developed for SWAT basin model.

  10. Columbia River Hatchery Reform System-Wide Report.

    Energy Technology Data Exchange (ETDEWEB)

    Warren, Dan [Hatchery Scientific Review Group

    2009-04-16

    The US Congress funded the Puget Sound and Coastal Washington Hatchery Reform Project via annual appropriations to the US Fish and Wildlife Service (USFWS) beginning in fiscal year 2000. Congress established the project because it recognized that while hatcheries have a necessary role to play in meeting harvest and conservation goals for Pacific Northwest salmonids, the hatchery system was in need of comprehensive reform. Most hatcheries were producing fish for harvest primarily to mitigate for past habitat loss (rather than for conservation of at-risk populations) and were not taking into account the effects of their programs on naturally spawning populations. With numerous species listed as threatened or endangered under the Endangered Species Act (ESA), conservation of salmon in the Puget Sound area was a high priority. Genetic resources in the region were at risk and many hatchery programs as currently operated were contributing to those risks. Central to the project was the creation of a nine-member independent scientific review panel called the Hatchery Scientific Review Group (HSRG). The HSRG was charged by Congress with reviewing all state, tribal and federal hatchery programs in Puget Sound and Coastal Washington as part of a comprehensive hatchery reform effort to: conserve indigenous salmonid genetic resources; assist with the recovery of naturally spawning salmonid populations; provide sustainable fisheries; and improve the quality and cost-effectiveness of hatchery programs. The HSRG worked closely with the state, tribal and federal managers of the hatchery system, with facilitation provided by the non-profit organization Long Live the Kings and the law firm Gordon, Thomas, Honeywell, to successfully complete reviews of over 200 hatchery programs at more than 100 hatcheries across western Washington. That phase of the project culminated in 2004 with the publication of reports containing the HSRG's principles for hatchery reform and recommendations

  11. HVAC system operation manual of IMEF

    International Nuclear Information System (INIS)

    Baek, Sang Yeol; Park, Dae Kyu; Ahn, Sang Bok; Ju, Yong Sun.

    1997-06-01

    This manual is operation procedures of the IMEF(Irradiated Material Examination Facility) HVAC(Heating, Ventilation and Air Conditioning) System. General operation procedures and test method of the IMEF HVAC system are described. The manual is as follows; 1. HVAC system operation manual 2. HVAC system management guide 3. HVAC system maintenance manual 4. HVAC system air velocity and flowrate measurement manual 5. HVAC system HEPA filter leak test manual 6. HVAC system charcoal filter leak test manual 7. HVAC system HEPA and charcoal filter exchange manual. (author). 8 tabs

  12. Water isotope composition as a tracer for study of mixing processes in rivers. Part II. Determination of mixing degrees in the tributary-main river systems

    International Nuclear Information System (INIS)

    Owczarczyk, A.; Wierzchnicki, R.; Zimnicki, R.; Ptaszek, S.; Palige, J.; Dobrowolski, A.

    2006-01-01

    Two river-tributary systems have been chosen for the investigation of mixing processes: the Narew River-the Bug River-Zegrzynski Reservoir and the Bugo-Narew River-the Vistula River. In both river systems, several profiles for the water sampling have been selected down to the tributary confluent line. Each sample position has been precisely determined by means of GPS. Then, the δDi have been measured in IRMS (isotope ratio mass spectroscopy). The δD distributions in selected profiles have been presented for both investigated river systems. Presented results will be applied for the verification of the mathematical model for transport and mixing in river systems

  13. `95 computer system operation project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new.

  14. '95 computer system operation project

    International Nuclear Information System (INIS)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new

  15. From academic to applied: Operationalising resilience in river systems

    Science.gov (United States)

    Parsons, Melissa; Thoms, Martin C.

    2018-03-01

    The concept of resilience acknowledges the ability of societies to live and develop with dynamic environments. Given the recognition of the need to prepare for anticipated and unanticipated shocks, applications of resilience are increasing as the guiding principle of public policy and programs in areas such as disaster management, urban planning, natural resource management, and climate change adaptation. River science is an area in which the adoption of resilience is increasing, leading to the proposition that resilience may become a guiding principle of river policy and programs. Debate about the role of resilience in rivers is part of the scientific method, but disciplinary disunity about the ways to approach resilience application in policy and programs may leave river science out of the policy process. We propose six elements that need to be considered in the design and implementation of resilience-based river policy and programs: rivers as social-ecological systems; the science-policy interface; principles, capacities, and characteristics of resilience; cogeneration of knowledge; adaptive management; and the state of the science of resilience.

  16. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  17. Autonomous Operations System: Development and Application

    Science.gov (United States)

    Toro Medina, Jaime A.; Wilkins, Kim N.; Walker, Mark; Stahl, Gerald M.

    2016-01-01

    Autonomous control systems provides the ability of self-governance beyond the conventional control system. As the complexity of mechanical and electrical systems increases, there develops a natural drive for developing robust control systems to manage complicated operations. By closing the bridge between conventional automated systems to knowledge based self-awareness systems, nominal control of operations can evolve into relying on safe critical mitigation processes to support any off-nominal behavior. Current research and development efforts lead by the Autonomous Propellant Loading (APL) group at NASA Kennedy Space Center aims to improve cryogenic propellant transfer operations by developing an automated control and health monitoring system. As an integrated systems, the center aims to produce an Autonomous Operations System (AOS) capable of integrating health management operations with automated control to produce a fully autonomous system.

  18. Functional safeguards for computers for protection systems for Savannah River reactors

    International Nuclear Information System (INIS)

    Kritz, W.R.

    1977-06-01

    Reactors at the Savannah River Plant have recently been equipped with a ''safety computer'' system. This system utilizes dual digital computers in a primary protection system that monitors individual fuel assembly coolant flow and temperature. The design basis for the (SRP safety) computer systems allowed for eventual failure of any input sensor or any computer component. These systems are routinely used by reactor operators with a minimum of training in computer technology. The hardware configuration and software design therefore contain safeguards so that both hardware and human failures do not cause significant loss of reactor protection. The performance of the system to date is described

  19. An Operational Short-Term Forecasting System for Regional Hydropower Management

    Science.gov (United States)

    Gronewold, A.; Labuhn, K. A.; Calappi, T. J.; MacNeil, A.

    2017-12-01

    The Niagara River is the natural outlet of Lake Erie and drains four of the five Great lakes. The river is used to move commerce and is home to both sport fishing and tourism industries. It also provides nearly 5 million kilowatts of hydropower for approximately 3.9 million homes. Due to a complex international treaty and the necessity of balancing water needs for an extensive tourism industry, the power entities operating on the river require detailed and accurate short-term river flow forecasts to maximize power output. A new forecast system is being evaluated that takes advantage of several previously independent components including the NOAA Lake Erie operational Forecast System (LEOFS), a previously developed HEC-RAS model, input from the New York Power Authority(NYPA) and Ontario Power Generation (OPG) and lateral flow forecasts for some of the tributaries provided by the NOAA Northeast River Forecast Center (NERFC). The Corps of Engineers updated the HEC-RAS model of the upper Niagara River to use the output forcing from LEOFS and a planned Grass Island Pool elevation provided by the power entities. The entire system has been integrated at the NERFC; it will be run multiple times per day with results provided to the Niagara River Control Center operators. The new model helps improve discharge forecasts by better accounting for dynamic conditions on Lake Erie. LEOFS captures seiche events on the lake that are often several meters of displacement from still water level. These seiche events translate into flow spikes that HEC-RAS routes downstream. Knowledge of the peak arrival time helps improve operational decisions at the Grass Island Pool. This poster will compare and contrast results from the existing operational flow forecast and the new integrated LEOFS/HEC-RAS forecast. This additional model will supply the Niagara River Control Center operators with multiple forecasts of flow to help improve forecasting under a wider variety of conditions.

  20. Operating multireservoir hydropower systems for downstream water quality

    International Nuclear Information System (INIS)

    Hayes, D.F.

    1990-01-01

    Hydropower reservoir operations often impact tailwater quality and water quality in the stream or river below the impoundment for many miles. Determining optimal operating strategies for a system of hydropower reservoirs involves solving a highly dimensional nonlinear, nonconvex optimization problem. This research adds the additional complexities of downstream water quality considerations within the optimization formulation to determine operating strategies for a system of hydropower reservoirs operating in series (tandem) or parallel. The formulation was used to determine operating strategies for six reservoirs of the upper Cumberland river basin in Tennessee and Kentucky. Significant dissolved oxygen (DO) violations occur just upstream of Nashville, Tennessee below Old Hickory dam during the months of August and September. Daily reservoir releases were determined for the period of June through September which would produce the maximum hydropower revenue while meeting downstream water quality objectives. Optimal releases for three operational strategies were compared to historical operations for the years 1985, 1986, and 1988. These strategies included: spilling as necessary to meet water quality criteria, near normal operation (minimal spills), and drawdown of reservoirs as necessary to meet criteria without spills. Optimization results showed an 8% to 15% hydropower loss may be necessary to meet water quality criteria through spills and a 2% to 9% improvement in DO below Old Hickory may be possible without significant spills. Results also showed that substantial increases in initial headwater elevations would be necessary to meet daily DO criteria and avoid spills. The optimal control theory algorithm used to solve the problem proved to be an efficient and robust solver of this large optimization problem

  1. Automated validation of a computer operating system

    Science.gov (United States)

    Dervage, M. M.; Milberg, B. A.

    1970-01-01

    Programs apply selected input/output loads to complex computer operating system and measure performance of that system under such loads. Technique lends itself to checkout of computer software designed to monitor automated complex industrial systems.

  2. Developing a knowledge system for information operations

    CSIR Research Space (South Africa)

    Leenen, L

    2011-03-01

    Full Text Available In this paper we describe a research project to develop an optimal information retrieval system in an Information Operations domain. Information Operations is the application and management of information to gain an advantage over an opponent...

  3. Walla Walla River Fish Passage Operations Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-02-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2004-2005 project year, there were 590 adult summer steelhead, 31 summer steelhead kelts (Oncorhynchus mykiss), 70 adult bull trout (Salvelinus confluentus); 80 adult and 1 jack spring Chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 13, 2004, and June 16, 2005. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by ODFW in order to enumerate fish passage. Of the total, 143 adult summer steelhead and 15 summer steelhead kelts were enumerated at the west ladder at Nursery Bridge Dam during the video efforts between February 4 and May 23, 2005. Operation of the Little Walla Walla River

  4. Safety Evaluation Report related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1984-10-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by Gulf States Utilities Company as applicant and for itself and Cajun Electric Power Cooperative, as owners, for a license to operate River Bend Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  5. Final environmental statement related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1985-01-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of River Bend Station, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  6. Draft environmental statement related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1984-07-01

    This draft environmental statement contains the second assessment of the environmental impact associated with the operation of River Bend Station, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  7. The fast Amsterdam multiprocessor (FAMP) operation system

    International Nuclear Information System (INIS)

    Gosman, D.; Hertzberger, L.O.; Holthuizen, D.J.; Por, G.J.A.; Schoorel, M.

    1981-01-01

    The Fast Amsterdam Multi Processor system (FAMP system) is developed for on-line filtering and second stage triggering. The system is based on the MC 68000 microprocessor from MOTOROLA. In this report we will describe: The FAMP operating system software, the features of the slaves and supervisor in the FAMP operating system, the communication between supervisor and slaves using the dual port memories, the communication between user programs and the operating system. The hardware as well as the application of the system will be described elsewhere. (orig.)

  8. Design of JRR-4 operation Supporting System

    International Nuclear Information System (INIS)

    Takahashi, Hiroki; Arai, Nobuyoshi; Yamamoto, Kazuyoshi; Yoritsune, Tsutomu

    1999-01-01

    A work on the Japan Research Reactor No. 4 (JRR-4) core modification from high-enriched fuels to low-enriched ones was started in 1996 and completed in May 1998. As a part of the work, Operation Supporting System (OSS) was adopted for the purpose of reducing load of operator, preventing operator's error and supplying operation data to users. As the result of adopting this system, integrated monitoring, automation of part of reactor operation and data management were realized. In addition, the cooling control system was compacted. (author)

  9. Tritium Systems Test Assembly operator training program

    International Nuclear Information System (INIS)

    Kerstiens, F.L.

    1985-01-01

    Proper operator training is needed to help ensure the safe operation of fusion facilities by personnel who are qualified to carry out their assigned responsibilities. Operators control and monitor the Tritium Systems Test Assembly (TSTA) during normal, emergency, and maintenance phases. Their performance is critical both to operational safety, assuring no release of tritium to the atmosphere, and to the successful simulation of the fusion reaction progress. Through proper training we are helping assure that TSTA facility operators perform their assignments in a safe and efficient manner and that the operators maintain high levels of operational proficiency through continuing training, retraining, requalification, and recertification

  10. 47 CFR 32.2220 - Operator systems.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...

  11. A moral Operating System of livestock farming

    NARCIS (Netherlands)

    Gremmen, Bart

    2017-01-01

    Societal views about livestock production systems in Europe are changing dramatically in a negative direction. Based on the tradition of pragmatism in applied philosophy I develop a Moral Operating System of animal production systems in cooperating a plurality of ethical views. This moral operating

  12. General Logic-Systems and Consequence Operators

    OpenAIRE

    Herrmann, Robert A.

    2005-01-01

    In this paper, general logic-systems are investigated. It is shown that there are infinitely many finite consequence operators defined on a fixed language L that cannot be generated from a finite logic-system. It is shown that a set map is a finite consequence operator iff it is defined by a general logic-system.

  13. River Debris Management System using Off-Grid Photovoltaic Module

    Directory of Open Access Journals (Sweden)

    Saadon Intan Mastura

    2017-01-01

    Full Text Available In Malaysia, Malacca River has long been the tourism attraction in Malacca. However, due to negligence, the river has been polluted by the litters thrown by tourists and even local residents, thus reflects a negative perception on Malacca. Therefore, this paper discusses about a fully automated river debris management system development using a stand-alone photovoltaic system. The concept design is to be stand alone in the river and automatically pull debris towards it for disposal. An off-grid stand-alone photovoltaic solar panel is used as renewable energy source connected to water pump and Arduino Uno microcontroller. The water pump rotates a water wheel and at the same time moves a conveyor belt; which is connected to the water wheel by a gear for debris collection. The solar system sizing suitable for the whole system is shown in this paper. The dumpster barge is equipped with an infrared sensor to monitor maximum height for debris, and instruct Arduino Uno to turn off the water pump. This system is able to power up using solar energy on sunny days and using battery otherwise.

  14. Water quality monitoring of Jialing-River in Chongqing using advanced ion chromatographic system.

    Science.gov (United States)

    Tanaka, Kazuhiko; Shi, Chao-Hong; Nakagoshi, Nobukazu

    2012-04-01

    The water quality monitoring operation to evaluate the water quality of polluted river is an extremely important task for the river-watershed management/control based on the environmental policy. In this study, the novel, simple and convenient water quality monitoring of Jialing-River in Chongqing, China was carried out using an advanced ion chromatography (IC) consisting of ion-exclusion/cation-exchange chromatography (IEC/CEC) with conductivity detection for determining simultaneously the common anions such as SO4(2-), Cl(-), and NO3(-) and the cations such as Na+, NH4+, K+, Mg2+, and Ca2+, the ion-exclusion chromatography (IEC) with visible detection for determining simultaneously the nutrient components such as phosphate and silicate ions, and the IEC with the enhanced conductivity detection using a post column of K+-form cation-exchange resin for determining HCO3(-)-alkalinity as an inorganic-carbon source for biomass synthesis in biological reaction process under the aerobic conditions. According to the ionic balance theory between the total equivalent concentrations of anions and cations, the water quality evaluation of the Jialing-River waters taking at different sampling sites in Chongqing metropolitan area was carried out using the advanced IC system. As a result, the effectiveness of this novel water quality monitoring methodology using the IC system was demonstrated on the several practical applications to a typical biological sewage treatment plant on Jialing-River of Chongqing.

  15. Walla Walla River Fish Passage Operations Program, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2004-03-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2002-2003 project year, there were 545 adult summer steelhead (Oncorhynchus mykiss), 29 adult bull trout (Salvelinus confluentus); 1 adult and 1 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway adult trap between January 1 and June 23, 2003. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. Operation of the Little Walla Walla River juvenile trap for trap and haul purposes was not necessary this year. The project transported 21 adult spring chinook from Ringold Springs Hatchery and 281 from Threemile Dam to the South Fork Walla Walla Brood Holding Facility. Of these, 290 were outplanted in August for natural spawning in the basin.

  16. Water quantity and quality optimization modeling of dams operation based on SWAT in Wenyu River Catchment, China.

    Science.gov (United States)

    Zhang, Yongyong; Xia, Jun; Chen, Junfeng; Zhang, Minghua

    2011-02-01

    Water quantity and quality joint operation is a new mode in the present dams' operation research. It has become a hot topic in governmental efforts toward integrated basin improvement. This paper coupled a water quantity and quality joint operation model (QCmode) and genetic algorithm with Soil and Water Assessment Tool (SWAT). Together, these tools were used to explore a reasonable operation of dams and floodgates at the basin scale. Wenyu River Catchment, a key area in Beijing, was selected as the case study. Results showed that the coupled water quantity and quality model of Wenyu River Catchment more realistically simulates the process of water quantity and quality control by dams and floodgates. This integrated model provides the foundation for research of water quantity and quality optimization on dam operation in Wenyu River Catchment. The results of this modeling also suggest that current water quality of Wenyu River will improve following the implementation of the optimized operation of the main dams and floodgates. By pollution control and water quantity and quality joint operation of dams and floodgates, water quality of Wenyu river will change significantly, and the available water resources will increase by 134%, 32%, 17%, and 82% at the downstream sites of Sha River Reservoir, Lutong Floodgate, Xinpu Floodgate, and Weigou Floodgate, respectively. The water quantity and quality joint operation of dams will play an active role in improving water quality and water use efficiency in Wenyu River Basin. The research will provide the technical support for water pollution control and ecological restoration in Wenyu River Catchment and could be applied to other basins with large number of dams. Its application to the Wenyu River Catchment has a great significance for the sustainable economic development of Beijing City.

  17. 77 FR 38780 - Proposed Reduction in Hours of Operation at the Mississippi River Twin Cities Locks Located in...

    Science.gov (United States)

    2012-06-29

    ... Operation at the Mississippi River Twin Cities Locks Located in Minneapolis, MN AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD. ACTION: Notice. SUMMARY: The three locks in the Twin Cities... the Twin Cities locks is Section 4 of the River and Harbor Act of August 18, 1894 (28 Stat. 362), as...

  18. A study of radionuclide dispersion by river systems, using GIS and remote sensing techniques

    International Nuclear Information System (INIS)

    Borghuis, Sander; Brown, Justin; Steenhuisen, Frits; Skorve, Johnny

    2000-01-01

    The Krasnoyarsk Mining and Chemical Combine in Zheleznogorsk, Russia, is situated on the banks of the Yenisey river. The combine consists of three RBMK-type graphite moderate reactors, a reprocessing plant for the production of weapons-grade plutonium and storage facilities for nuclear waste. Discharges of radionuclides into the Yenisey river were either part of normal operation procedures or caused by accidental releases (Strand et al., 1997). So far, little is known about the transport and fate of the radioactive contaminants in the areas downstream of the Krasnoyarsk CC that are influenced by the Yenisey river system. Aim is to comprehend the dispersion of radionuclides through the river system. Remotely sensed and field study information are combined in a geographical information system (GIS) to study the processes leading to the dispersion of sediment-bound radionuclides carried by the river system. Since the extent of the study area is several thousands or kilometres of river and adjacent flood plains, use is made of a record of remotely sensed (satellite) images that are handled by the GIS. Panchromatic, high resolution satellite images as well as multispectral Landsat MSS and TM images were compiled for the area of interest. The panchromatic images were taken in a period during which the facility was in operation (1960-1972) and obtained for intervals of circa 6 months. A time series of satellite images enables the identification of erosion and sedimentation zones. The behaviour and fate of particle-reactive radionuclides, e.g. 239,240 Pu and to large extent 137 Cs, will be closely related to the movement of sediment. With respect to the behaviour and fate of more conservative radionuclides as 90 Sr, information is required accounting for fractionation between the particulate and aqueous phases. Stereo images are used to comprehend the geomorphology of the Yenisey river systems, focused on classification of sedimentary deposits. Landsat MSS and TM with five

  19. Safety evaluation report related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1984-05-01

    The Safety Evaluation Report for the application filed by the Gulf States Utilities Company, as applicant and owner, for a license to operate the River Bend Station (Docket No. 50-458) has been prepared by the Office of Nuclear Reactor Regulation of US Nuclear Regulatory Commission. The facility is located near St. Francisville, Louisiana. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  20. Remote video radioactive systems evaluation, Savannah River Site

    International Nuclear Information System (INIS)

    Heckendorn, F.M.; Robinson, C.W.

    1991-01-01

    Specialized miniature low cost video equipment has been effectively used in a number of remote, radioactive, and contaminated environments at the Savannah River Site (SRS). The equipment and related techniques have reduced the potential for personnel exposure to both radiation and physical hazards. The valuable process information thus provided would not have otherwise been available for use in improving the quality of operation at SRS

  1. Understanding Socio-Hydrology System in the Kissimmee River Basin

    Science.gov (United States)

    Chen, X.; Wang, D.; Tian, F.; Sivapalan, M.

    2014-12-01

    This study is to develop a conceptual socio-hydrology model for the Kissimmee River Basin. The Kissimmee River located in Florida was channelized in mid-20 century for flood protection. However, the environmental issues caused by channelization led Floridians to conduct a restoration project recently, focusing on wetland recovery. As a complex coupled human-water system, Kissimmee River Basin shows the typical socio-hydrology interactions. Hypothetically, the major reason to drive the system from channelization to restoration is that the community sensitivity towards the environment has changed from controlling to restoring. The model developed in this study includes 5 components: water balance, flood risk, wetland area, crop land area, and community sensitivity. Furthermore, urban population and rural population in the basin have different community sensitivities towards the hydrologic system. The urban population, who live further away from the river are more sensitive to wetland restoration; while the rural population, who live closer to the river are more sensitive to flood protection. The power dynamics between the two groups and its impact on management decision making is described in the model. The model is calibrated based on the observed watershed outflow, wetland area and crop land area. The results show that the overall focus of community sensitivity has changed from flood protection to wetland restoration in the past 60 years in Kissimmee River Basin, which confirms the study hypothesis. There are two main reasons for the community sensitivity change. Firstly, people's flood memory is fading because of the effective flood protection, while the continuously shrinking wetland and the decreasing bird and fish population draw more and more attention. Secondly, in the last 60 years, the urban population in Florida drastically increased compared with a much slower increase of rural population. As a result, the community sensitivity of urban population towards

  2. Downstream flow top width prediction in a river system | Choudhury ...

    African Journals Online (AJOL)

    ANFIS, ARIMA and Hybrid Multiple Inflows Muskingum models (HMIM) were applied to simulate and forecast downstream discharge and flow top widths in a river system. The ANFIS model works on a set of linguistic rules while the ARIMA model uses a set of past values to predict the next value in a time series. The HMIM ...

  3. The University of Wisconsin OAO operating system

    Science.gov (United States)

    Heacox, H. C.; Mcnall, J. F.

    1972-01-01

    The Wisconsin OAO operating system is presented which consists of two parts: a computer program called HARUSPEX, which makes possible reasonably efficient and convenient operation of the package and ground operations equipment which provides real-time status monitoring, commanding and a quick-look at the data.

  4. RHCV Telescope System Operations Manual

    Science.gov (United States)

    2018-01-05

    KRISTOFFER A. SMITH-RODRIGUEZ, LTCOL, USAF Chief, Warfighter Interface Division Airman Systems Directorate This report is published in the...other system components via ASCOM protocols. 1. Start the MaxImDL application using the desktop shortcut (a) Start Observatory dialog, (b...the desktop shortcut (a) Select “Connect Telescope” from Startup menu in Telescope tab (b) Select “Look Up” icon on ribbon menu at the top right of

  5. Clinch River Breeder Reactor secondary control rod system

    International Nuclear Information System (INIS)

    McKeehan, E.R.; Sim, R.G.

    1977-01-01

    The shutdown system for the Clinch River Breeder Reactor (CRBR) includes two independent systems--a primary and a secondary system. The Secondary Control Rod System (SCRS) is a new design which is being developed by General Electric to be independent from the primary system in order to improve overall shutdown reliability by eliminating potential common-mode failures. The paper describes the status of the SCRS design and fabrication and testing activities. Design verification testing on the component level is largely complete. These component tests are covered with emphasis on design impact results. A prototype unit has been manufactured and system level tests in sodium have been initiated

  6. Operational expert system applications in Europe

    CERN Document Server

    Zarri, Gian Piero

    1992-01-01

    Operational Expert System Applications in Europe describes the representative case studies of the operational expert systems (ESs) that are used in Europe.This compilation provides examples of operational ES that are realized in 10 different European countries, including countries not usually examined in the standard reviews of the field.This book discusses the decision support system using several artificial intelligence tools; expert systems for fault diagnosis on computerized numerical control (CNC) machines; and expert consultation system for personal portfolio management. The failure prob

  7. Development of nuclear plant Operation Management System

    Energy Technology Data Exchange (ETDEWEB)

    Koide, I.; Okada, T.; Ishida, K. [Chubu Electric Power Co. Inc., Nagoya (Japan)

    1998-09-01

    Recently it has become more important to detect a change in operational characteristics and to take appropriate corrective actions before it deteriorates to an incident in nuclear power plants. Therefore, aiming at earlier detection of a tendency change, swifter corrective actions and more effective application of operational data, we have developed Operation Management System which automatically acquires, accumulates and observes operational data of Hamaoka Nuclear Power Station through cycles. (author)

  8. Development of nuclear plant Operation Management System

    International Nuclear Information System (INIS)

    Koide, I.; Okada, T.; Ishida, K.

    1998-01-01

    Recently it has become more important to detect a change in operational characteristics and to take appropriate corrective actions before it deteriorates to an incident in nuclear power plants. Therefore, aiming at earlier detection of a tendency change, swifter corrective actions and more effective application of operational data, we have developed Operation Management System which automatically acquires, accumulates and observes operational data of Hamaoka Nuclear Power Station through cycles. (author)

  9. Supporting inland waterway transport on German waterways by operational forecasting services - water-levels, discharges, river ice

    Science.gov (United States)

    Meißner, Dennis; Klein, Bastian; Ionita, Monica; Hemri, Stephan; Rademacher, Silke

    2017-04-01

    Inland waterway transport (IWT) is an important commercial sector significantly vulnerable to hydrological impacts. River ice and floods limit the availability of the waterway network and may cause considerable damages to waterway infrastructure. Low flows significantly affect IWT's operation efficiency usually several months a year due to the close correlation of (low) water levels / water depths and (high) transport costs. Therefore "navigation-related" hydrological forecasts focussing on the specific requirements of water-bound transport (relevant forecast locations, target parameters, skill characteristics etc.) play a major role in order to mitigate IWT's vulnerability to hydro-meteorological impacts. In light of continuing transport growth within the European Union, hydrological forecasts for the waterways are essential to stimulate the use of the free capacity IWT still offers more consequently. An overview of the current operational and pre-operational forecasting systems for the German waterways predicting water levels, discharges and river ice thickness on various time-scales will be presented. While short-term (deterministic) forecasts have a long tradition in navigation-related forecasting, (probabilistic) forecasting services offering extended lead-times are not yet well-established and are still subject to current research and development activities (e.g. within the EU-projects EUPORIAS and IMPREX). The focus is on improving technical aspects as well as on exploring adequate ways of disseminating and communicating probabilistic forecast information. For the German stretch of the River Rhine, one of the most frequented inland waterways worldwide, the existing deterministic forecast scheme has been extended by ensemble forecasts combined with statistical post-processing modules applying EMOS (Ensemble Model Output Statistics) and ECC (Ensemble Copula Coupling) in order to generate water level predictions up to 10 days and to estimate its predictive

  10. Reexamining Operating System Support for Database Management

    OpenAIRE

    Vasil, Tim

    2003-01-01

    In 1981, Michael Stonebraker [21] observed that database management systems written for commodity operating systems could not effectively take advantage of key operating system services, such as buffer pool management and process scheduling, due to expensive overhead and lack of customizability. The “not quite right” fit between these kernel services and the demands of database systems forced database designers to work around such limitations or re-implement some kernel functionality in user ...

  11. Nonnative Fishes in the Upper Mississippi River System

    Science.gov (United States)

    Irons, Kevin S.; DeLain, Steven A.; Gittinger, Eric; Ickes, Brian S.; Kolar, Cindy S.; Ostendort, David; Ratcliff, Eric N.; Benson, Amy J.; Irons, Kevin S.

    2009-01-01

    The introduction, spread, and establishment of nonnative species is widely regarded as a leading threat to aquatic biodiversity and consequently is ranked among the most serious environmental problems facing the United States today. This report presents information on nonnative fish species observed by the Long Term Resource Monitoring Program on the Upper Mississippi River System a nexus of North American freshwater fish diversity for the Nation. The Long Term Resource Monitoring Program, as part of the U.S. Army Corps of Engineers' Environmental Management Plan, is the Nation's largest river monitoring program and stands as the primary source of standardized ecological information on the Upper Mississippi River System. The Long Term Resource Monitoring Program has been monitoring fish communities in six study areas on the Upper Mississippi River System since 1989. During this period, more than 3.5 million individual fish, consisting of 139 species, have been collected. Although fish monitoring activities of the Long Term Resource Monitoring Program focus principally on entire fish communities, data collected by the Program are useful for detecting and monitoring the establishment and spread of nonnative fish species within the Upper Mississippi River System Basin. Sixteen taxa of nonnative fishes, or hybrids thereof, have been observed by the Long Term Resource Monitoring Program since 1989, and several species are presently expanding their distribution and increasing in abundance. For example, in one of the six study areas monitored by the Long Term Resource Monitoring Program, the number of established nonnative species has increased from two to eight species in less than 10 years. Furthermore, contributions of those eight species can account for up to 60 percent of the total annual catch and greater than 80 percent of the observed biomass. These observations are critical because the Upper Mississippi River System stands as a nationally significant pathway for

  12. Treatment system operation, management, and finance

    Energy Technology Data Exchange (ETDEWEB)

    Truax, D.D. (Mississippi State Univ., Mississippi State (United States))

    1990-06-01

    This article deals with literature on operation, management, and financing of wastewater treatment plants. Some topics discussed are system hydraulics and flow monitoring, odor, reliability, equipment age, management philosophy, performance, reducing operating cost, planning and response to emergencies, preventative maintenance, inspection systems, mechanical vibrations, safety, privatization, municipal leasing, user and impact fees.

  13. Development of JRR-4 operation support system

    International Nuclear Information System (INIS)

    Takahashi, Hiroki; Yamamoto, Kazuyoshi; Yoritsune, Tsutomu; Arai, Nobuyoshi; Birumachi, Takashi

    1999-03-01

    The Japan Research Reactor No.4 (JRR-4) is a light water moderated and cooled, graphite reflected, pool-type reactor with the thermal output of 3500 kW. In February 1996, a work on core modification from high-enriched fuels to low-enriched ones was started and the work on modification was completed in May 1998. As a part of the work, Operation Support System (OSS) was adopted for the purpose of reducing load of operator, preventing operator's error and supplying operation data to users. In this paper, JRR-4 Operation Support System's configuration, characteristics and development process are described. OSS consists mainly of a workstation (WS), μXL and Personal Computer (PC). WS is used for collection of operation data. μXL is used for cooling system control and PC is used for operators' support. All of the program applications used in WS, μXL and PC are designed to make sure of high flexibility for the demands on modification from operators and new operation modes. The result of adopting this system, the consolidation monitoring, automation of part of reactor operation and data management were realized. In addition, the cooling control system was compacted. (author)

  14. Control and Operation of Islanded Distribution System

    DEFF Research Database (Denmark)

    Mahat, Pukar

    deviation and real power shift. When a distribution system, with all its generators operating at maximum power, is islanded, the frequency will go down if the total load is more than the total generation. An under-frequency load shedding procedure for islanded distribution systems with DG unit(s) based...... states. Short circuit power also changes when some of the generators in the distribution system are disconnected. This may result in elongation of fault clearing time and hence disconnection of equipments (including generators) in the distribution system or unnecessary operation of protective devices...... operational challenges. But, on the other hand, it has also opened up some opportunities. One opportunity/challenge is an islanded operation of a distribution system with DG unit(s). Islanding is a situation in which a distribution system becomes electrically isolated from the remainder of the power system...

  15. Operational advanced materials control and accountability system

    International Nuclear Information System (INIS)

    Malanify, J.J.; Bearse, R.C.; Christensen, E.L.

    1980-01-01

    An accountancy system based on the Dynamic Materials Accountability (DYMAC) System has been in operation at the Plutonium Processing Facility at the Los Alamos Scientific Laboratory (LASL) since January 1978. This system, now designated the Plutonium Facility/Los Alamos Safeguards System (PF/LASS), has enhanced nuclear material accountability and process control at the LASL facility. The nondestructive assay instruments and the central computer system are operating accurately and reliably. As anticipated, several uses of the system have developed in addition to safeguards, notably scrap control and quality control. The successes of this experiment strongly suggest that implementation of DYMAC-based systems should be attempted at other facilities. 20 refs

  16. Automatic diagnosis of alarms: a system to improve operator emergency response

    International Nuclear Information System (INIS)

    Olson, H.P.; Gimmy, K.L.; Nomm, E.; Finley, R.H.

    1980-01-01

    A system is being developed at the Savannah River Plant to help reactor operators respond to multiple alarms in a developing incident situation. The need for such systems has becme evident in recent years, particularly after the Three Mile Island incident

  17. Operator support system for nuclear power plants

    International Nuclear Information System (INIS)

    Mori, Nobuyuki; Tai, Ichiro; Sudo, Osamu; Naito, Norio.

    1987-01-01

    The nuclear power generation in Japan maintains the high capacity factor, and its proportion taken in the total generated electric power exceeded 1/4, thus it has become the indispensable energy source. Recently moreover, the nuclear power plants which are harmonious with operators and easy to operate are demanded. For realizing this, the technical development such as the heightening of operation watching performance, the adoption of automation, and the improvement of various man-machine systems for reducing the burden of operators has been advanced by utilizing electronic techniques. In this paper, the trend of the man-machine systems in nuclear power plants, the positioning of operation support system, the support in the aspects of information, action and knowledge, the example of a new central control board, the operation support system using a computer, an operation support expert system and the problems hereafter are described. As the development of the man-machine system in nuclear power plants, the upgrading from a present new central control board system PODIA through A-PODIA, in which the operational function to deal with various phenomena arising in plants and safety control function are added, to 1-PODIA, in which knowledge engineering technology is adopted, is expected. (Kako, I.)

  18. Synergetic Development Assessment of Urban River System Landscapes

    Directory of Open Access Journals (Sweden)

    Jingya Qiao

    2017-11-01

    Full Text Available This paper presents Synergetic Development Assessment (SDA as a methodology to evaluate the environmental, economic, and social performance of an urban river system landscape from the perspective of sustainability. SDA is based on synergetics and its “order parameters” theory, proposed as a science to study the self-organization of complex systems. A case study of river system landscapes in China was carried out by, first, simplifying the composite system into three subsystems: environmental, economic, and social; then, going on to construct a hierarchical structure to explore the order parameters as the evaluation index. The Analytic Hierarchy Process was used to get the weight of the evaluation index to complete the assessment index system. At the same time, a Sequential Synergy Degree Model was built to accomplish the SDA. We find that from 2005 to 2015, the order degree of the environmental subsystem developed slowly, with fluctuations, and that river pattern is the key factor. Meanwhile, the order degree of the economic subsystem fluctuated widely, which significantly depended on the changing value of water resources, and the order degree of social subsystem improved continuously, with social culture lagging far behind. As a whole, the synergy degree of the composite system developed orderly at a corresponding low level, which was in low synergy from 2005 to 2009 and then in general synergy up to 2015.

  19. Real-Time Operating Systems for Multicore Embedded Systems

    OpenAIRE

    Tomiyama, Hiroyuki; Honda, Shinya; Takada, Hiroaki

    2008-01-01

    Multicore systems-on-chip have become popular inthe design of embedded systems in order to simultaneously achieve high performance and low power consumption. On the software side, real-time operating systems are necessary in orderto handle growing complexity of embedded software. This paper describes requirements, design principles and implementation techniques for real-time operating systems to be used inasymmetric multicore systems.

  20. Small Aircraft Transportation System, Higher Volume Operations Concept: Normal Operations

    Science.gov (United States)

    Abbott, Terence S.; Jones, Kenneth M.; Consiglio, Maria C.; Williams, Daniel M.; Adams, Catherine A.

    2004-01-01

    This document defines the Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) concept for normal conditions. In this concept, a block of airspace would be established around designated non-towered, non-radar airports during periods of poor weather. Within this new airspace, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Using onboard equipment and procedures, they would then approach and land at the airport. Departures would be handled in a similar fashion. The details for this operational concept are provided in this document.

  1. Modernisation of the CERN operational dosimetery system

    CERN Multimedia

    Caroline Duc

    2013-01-01

     As part of continual efforts to ensure the highest standards in the field of Radiation Protection, CERN is modernising its operational dosimetry system.   Pierre Carbonez, head of the Dosimetery and Instrument Calibration Service, with one of the new automatic operational dosimetery reader terminals. No more sheets of paper to record radiation doses at the entrance to the accelerators: the operational dosimetry system is being modernised! Since March, 50 automatic operational dosimeter reader terminals are in operation around the accelerator complex. Operational dosimeters (DMC) complement the "passive" dosimeters (DIS) and must be used every time you enter Controlled Radiation Areas. They measure the dose of radiation received by the exposed worker in real time and give a warning if the acceptable threshold is exceeded. The new dosimeter reader system allows the dosage recording procedure to be automated. “Every pers...

  2. UNIX-based operating systems robustness evaluation

    Science.gov (United States)

    Chang, Yu-Ming

    1996-01-01

    Robust operating systems are required for reliable computing. Techniques for robustness evaluation of operating systems not only enhance the understanding of the reliability of computer systems, but also provide valuable feed- back to system designers. This thesis presents results from robustness evaluation experiments on five UNIX-based operating systems, which include Digital Equipment's OSF/l, Hewlett Packard's HP-UX, Sun Microsystems' Solaris and SunOS, and Silicon Graphics' IRIX. Three sets of experiments were performed. The methodology for evaluation tested (1) the exception handling mechanism, (2) system resource management, and (3) system capacity under high workload stress. An exception generator was used to evaluate the exception handling mechanism of the operating systems. Results included exit status of the exception generator and the system state. Resource management techniques used by individual operating systems were tested using programs designed to usurp system resources such as physical memory and process slots. Finally, the workload stress testing evaluated the effect of the workload on system performance by running a synthetic workload and recording the response time of local and remote user requests. Moderate to severe performance degradations were observed on the systems under stress.

  3. Walla Walla River Fish Passage Operations Program, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-12-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2003-2004 project year, there were 379 adult summer steelhead (Oncorhynchus mykiss), 36 adult bull trout (Salvelinus confluentus); 108 adult and 3 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 21, 2003, and June 30, 2004. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by the WWBNPME project in order to radio tag spring chinook adults. A total of 2 adult summer steelhead, 4 bull trout, and 23 adult spring chinook were enumerated at the west ladder at Nursery Bridge Dam during the trapping operations between May 6 and May 23, 2004. Operation of the Little Walla Walla

  4. Dynamic Management of Releases for the Delaware River Basin using NYC's Operations Support Tool

    Science.gov (United States)

    Weiss, W.; Wang, L.; Murphy, T.; Muralidhar, D.; Tarrier, B.

    2011-12-01

    The New York City Department of Environmental Protection (DEP) has initiated design of an Operations Support Tool (OST), a state-of-the-art decision support system to provide computational and predictive support for water supply operations and planning. Using an interim version of OST, DEP and the New York State Department of Environmental Conservation (DEC) have developed a provisional, one-year Delaware River Basin reservoir release program to succeed the existing Flexible Flow Management Program (FFMP) which expired on May 31, 2011. The FFMP grew out of the Good Faith Agreement of 1983 among the four Basin states (New York, New Jersey, Pennsylvania, and Delaware) that established modified diversions and flow targets during drought conditions. It provided a set of release schedules as a framework for managing diversions and releases from New York City's Delaware Basin reservoirs in order to support multiple objectives, including water supply, drought mitigation, flood mitigation, tailwaters fisheries, main stem habitat, recreation, and salinity repulsion. The provisional program (OST-FFMP) defines available water based on current Upper Delaware reservoir conditions and probabilistic forecasts of reservoir inflow. Releases are then set based on a set of release schedules keyed to the water availability. Additionally, OST-FFMP attempts to provide enhanced downstream flood protection by making spill mitigation releases to keep the Delaware System reservoirs at a seasonally varying conditional storage objective. The OST-FFMP approach represents a more robust way of managing downstream releases, accounting for predicted future hydrologic conditions by making more water available for release when conditions are forecasted to be wet and protecting water supply reliability when conditions are forecasted to be dry. Further, the dynamic nature of the program allows the release decision to be adjusted as hydrologic conditions change. OST simulations predict that this

  5. Operator aid system for Dhruva fueling machine

    International Nuclear Information System (INIS)

    Misra, S.M.; Ramaswamy, L.R.; Gohel, N.; Bharadwaj, G.; Ranade, M.R.; Khadilkar, M.G.

    1997-01-01

    Systems with significant software contents are replacing the old hardware logic systems. These systems not only are versatile but are easy to make changes in the program. Extensive use of such systems in critical real-time operation environment warrants not only excessive training on simulators, documentation but also fault tolerant system to bring the operation to a safe state in case of error. With new graphic user software interface and advancement in personal computer hardware design, the dynamic status of the physical environment can be shown on the visual display at near real time. These visual aids along with the software covering all the interlocks aids an operator in his professional work. This paper highlights the operator aid system for Dhruva fueling machine. (author). 6 refs., 1 fig

  6. Surface Operations Systems Improve Airport Efficiency

    Science.gov (United States)

    2009-01-01

    With Small Business Innovation Research (SBIR) contracts from Ames Research Center, Mosaic ATM of Leesburg, Virginia created software to analyze surface operations at airports. Surface surveillance systems, which report locations every second for thousands of air and ground vehicles, generate massive amounts of data, making gathering and analyzing this information difficult. Mosaic?s Surface Operations Data Analysis and Adaptation (SODAA) tool is an off-line support tool that can analyze how well the airport surface operation is working and can help redesign procedures to improve operations. SODAA helps researchers pinpoint trends and correlations in vast amounts of recorded airport operations data.

  7. Operating control techniques for maglev transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Kraft, K H; Schnieder, E

    1984-06-01

    The technical and operational possibilities of magnetic levitation transport systems can only be fully exploited by introducing 'intelligent' control systems which ensure automatic and trouble-free train running. The solution of exacting requirements in the fields of traction dynamics, security and control as well as information gathering transmission and processing is an important prior condition in that respect. The authors report here on the present state of research and development in operating control techniques applicable to maglev transport systems.

  8. NASA Customer Data and Operations System

    Science.gov (United States)

    Butler, Madeline J.; Stallings, William H.

    1991-01-01

    In addition to the currently provided NASA services such as Communications and Tracking and Data Relay Satellite System services, the NASA's Customer Data and Operations System (CDOS) will provide the following services to the user: Data Delivery Service, Data Archive Service, and CDOS Operations Management Service. This paper describes these services in detail and presents respective block diagrams. The CDOS services will support a variety of multipurpose missions simultaneously with centralized and common hardware and software data-driven systems.

  9. Intelligent systems supporting the control room operators

    International Nuclear Information System (INIS)

    Berger, E.

    1997-01-01

    The operational experience obtained with the various applications of the systems discussed in this paper shows that more consequent use of the systems will make detection and management of disturbances still more efficient and faster. This holds true both for a low level of process automation and for power plants with a high level of automation. As for conventional power plants, the trend clearly is towards higher degrees of automation and consequent application of supporting systems. Thus, higher availability and rapid failure management are achieved, at low effects on normal operation. These systems are monitoring and process control systems, expert systems, and systems for optimal use of the equipment, or systems for post-incident analyses and computer-assisted on-shift protocols, or operating manuals. (orig./CB) [de

  10. Walla Walla River Fish Passage Operations Program, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, Brian C. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2004-02-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow measures, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2000-2001 project year, there were 624 summer steelhead (Oncorhynchus mykiss), 24 bull trout (Salvelinus confluentus), and 47 spring chinook (O. tshawytscha) counted at the Nursery Bridge Dam adult trap between December 27, 2000 and June 7, 2001. The Little Walla Walla River juvenile trap was not operated this year. The project transported 1600 adult spring chinook from Ringold Springs Hatchery to the South Fork Walla Walla Brood Holding Facility and outplanted 1156 for natural spawning in the basin. The project also provided equipment for transportation of juveniles captured during the construction fish salvage at Nursery Bridge Dam.

  11. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  12. Initial Operation of the Savannah River Site Advanced Storage Monitoring Facility

    International Nuclear Information System (INIS)

    McCurry, D.R.

    2001-01-01

    An advanced storage monitoring facility has been constructed at the Savannah River Site capable of storing sensitive nuclear materials (SNM) with access to monitoring information available over the Internet. This system will also have monitoring information available over the Internet to appropriate users. The programs will ultimately supply authenticated and encrypted data from the storage sites to certified users to demonstrate the capability of using the Internet as a safe and secure communications medium for remote monitoring of sensitive items

  13. Non-Operational Property Evaluation for the Hanford Site River Corridor - 12409

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, John [CH2M HILL, Richland, Washington 99354 (United States); Aly, Alaa [CH2M HILL Plateau Remediation Company and INTERA Incorporated, Richland, Washington 99354 (United States)

    2012-07-01

    The Hanford Site River Corridor consists of the former reactor areas of the 100 Areas and the former industrial (fuel processing) area in the 300 Area. Most of the waste sites are located close to the decommissioned reactors or former industrial facilities along the Columbia River. Most of the surface area of the River Corridor consists of land with little or no subsurface infrastructure or indication of past or present releases of hazardous constituents, and is referred to as non-operational property or non-operational area. Multiple lines of evidence have been developed to assess identified fate and transport mechanisms and to evaluate the potential magnitude and significance of waste site-related contaminants in the non-operational area. Predictive modeling was used for determining the likelihood of locating waste sites and evaluating the distribution of radionuclides in soil based on available soil concentration data and aerial radiological surveys. The results of this evaluation indicated: 1) With the exception of stack emissions, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas, 2) Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides, and (3) the likelihood of detecting elevated radionuclide concentrations or other waste sites in non-operational area soils is very small. The overall conclusions from the NPE evaluation of the River Corridor are: - With the exception of stack emissions to the air, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas. While pathways such as windblown dust, overland transport and biointrusion have the potential for dispersing waste site contaminants, the resulting transport is unlikely to result in substantial contamination in non-operational areas. - Stack

  14. Conjunctive operation of river facilities for integrated water resources management in Korea

    Directory of Open Access Journals (Sweden)

    H. Kim

    2016-10-01

    Full Text Available With the increasing trend of water-related disasters such as floods and droughts resulting from climate change, the integrated management of water resources is gaining importance recently. Korea has worked towards preventing disasters caused by floods and droughts, managing water resources efficiently through the coordinated operation of river facilities such as dams, weirs, and agricultural reservoirs. This has been pursued to enable everyone to enjoy the benefits inherent to the utilization of water resources, by preserving functional rivers, improving their utility and reducing the degradation of water quality caused by floods and droughts. At the same time, coordinated activities are being conducted in multi-purpose dams, hydro-power dams, weirs, agricultural reservoirs and water use facilities (featuring a daily water intake of over 100 000 m3 day−1 with the purpose of monitoring the management of such facilities. This is being done to ensure the protection of public interest without acting as an obstacle to sound water management practices. During Flood Season, each facilities contain flood control capacity by limited operating level which determined by the Regulation Council in advance. Dam flood discharge decisions are approved through the flood forecasting and management of Flood Control Office due to minimize flood damage for both upstream and downstream. The operational plan is implemented through the council's predetermination while dry season for adequate quantity and distribution of water.

  15. Operational readiness review of the Low Level Waste vaults at Savannah River Site: A case study

    International Nuclear Information System (INIS)

    Ahmad, M.; McVay, C.; Venkatesh, S.

    1994-01-01

    Low Level radioactive Waste (LLW) at the Savannah River Site at Aiken, South Carolina, has traditionally been disposed of using engineered trenches in accordance with the guidelines and technology existing at the time. Recently, subgrade concrete vaults known as E-Area Vaults (EAV) have been constructed at SRS. The EAV project is a comprehensive effort for upgrading LLW disposal at SRS based on meeting the requirements of current Department of Energy (DOE) Orders, and addressing more stringent federal and state regulations. The EAV is a first of its kind state-of-the-art facility designed and built in the United States to receive LLW. Westinghouse Savannah River Company (WSRC) conducted an Operational Readiness Review (ORR) of the vaults prior to startup. The objective of the EAV ORR was to perform a comprehensive review of the operational readiness of the facilities per DOE guidelines including Defense Nuclear Facilities Safety Board (DNFSB) recommendations. This review included assessing construction of the vaults as per design, adequate approved procedures, and training of all the personnel associated with the facility operations. EAV ORR incorporated the lessons learned from other DOE ORRs, included DNFSB recommendations, used a graded approach, and utilized subject matter experts for each functional area of assessment

  16. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    International Nuclear Information System (INIS)

    Yin, S.C.L.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios

  17. Software fault tolerance in computer operating systems

    Science.gov (United States)

    Iyer, Ravishankar K.; Lee, Inhwan

    1994-01-01

    This chapter provides data and analysis of the dependability and fault tolerance for three operating systems: the Tandem/GUARDIAN fault-tolerant system, the VAX/VMS distributed system, and the IBM/MVS system. Based on measurements from these systems, basic software error characteristics are investigated. Fault tolerance in operating systems resulting from the use of process pairs and recovery routines is evaluated. Two levels of models are developed to analyze error and recovery processes inside an operating system and interactions among multiple instances of an operating system running in a distributed environment. The measurements show that the use of process pairs in Tandem systems, which was originally intended for tolerating hardware faults, allows the system to tolerate about 70% of defects in system software that result in processor failures. The loose coupling between processors which results in the backup execution (the processor state and the sequence of events occurring) being different from the original execution is a major reason for the measured software fault tolerance. The IBM/MVS system fault tolerance almost doubles when recovery routines are provided, in comparison to the case in which no recovery routines are available. However, even when recovery routines are provided, there is almost a 50% chance of system failure when critical system jobs are involved.

  18. Safety evaluation report related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1985-08-01

    Supplement No. 3 to the Safety Evaluation Report on the application filed by Gulf States Utilities Company as applicant and for itself and Cajun Electric Power cooperative, as owners, for a license to operate River Bend Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in West Feliciana Parish, near St. Francisville, Louisiana. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report, Supplement No. 1, and Supplement No. 2

  19. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This volume is in support of the findings of an investigation into contamination of the Clinch River and Poplar Creek near the Oak Ridge Reservation (for more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities there). It addresses the quality assurance objectives for measuring the data, presents selected historical data, contains data from several discrete water characterization studies, provides data supporting the sediment characterization, and contains data related to several biota characterization studies.

  20. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Loffink, Ken; Duke, Bill

    2008-12-31

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelhead and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one

  1. Operation of staged membrane oxidation reactor systems

    Science.gov (United States)

    Repasky, John Michael

    2012-10-16

    A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

  2. Support system for ATLAS distributed computing operations

    CERN Document Server

    Kishimoto, Tomoe; The ATLAS collaboration

    2018-01-01

    The ATLAS distributed computing system has allowed the experiment to successfully meet the challenges of LHC Run 2. In order for distributed computing to operate smoothly and efficiently, several support teams are organized in the ATLAS experiment. The ADCoS (ATLAS Distributed Computing Operation Shifts) is a dedicated group of shifters who follow and report failing jobs, failing data transfers between sites, degradation of ATLAS central computing services, and more. The DAST (Distributed Analysis Support Team) provides user support to resolve issues related to running distributed analysis on the grid. The CRC (Computing Run Coordinator) maintains a global view of the day-to-day operations. In this presentation, the status and operational experience of the support system for ATLAS distributed computing in LHC Run 2 will be reported. This report also includes operations experience from the grid site point of view, and an analysis of the errors that create the biggest waste of wallclock time. The report of oper...

  3. Operation safety of complex industrial systems

    International Nuclear Information System (INIS)

    Zwingelstein, G.

    1999-01-01

    Zero fault or zero risk is an unreachable goal in industrial activities like nuclear activities. However, methods and techniques exist to reduce the risks to the lowest possible and acceptable level. The operation safety consists in the recognition, evaluation, prediction, measurement and mastery of technological and human faults. This paper analyses each of these points successively: 1 - evolution of operation safety; 2 - definitions and basic concepts: failure, missions and functions of a system and of its components, basic concepts and operation safety; 3 - forecasting analysis of operation safety: reliability data, data-banks, precautions for the use of experience feedback data; realization of an operation safety study: management of operation safety, quality assurance, critical review and audit of operation safety studies; 6 - conclusions. (J.S.)

  4. Record of Decision; Continued operation of K, L, and P Reactors, Savannah River Site, Aiken, South Carolina

    International Nuclear Information System (INIS)

    1991-01-01

    The US Department of Energy (DOE) has considered the environmental impacts, benefits and costs, and institutional and programmatic needs associated with continued operation of the Savannah River Site (SRS) reactors, and has decided that it will continue to operate K and L Reactors at SRS, and will terminate operation of P Reactor in the immediate future and maintain it in cold standby. For P Reactor, this will involve the reactor's defueling; storage of its heavy water moderator in tanks in the reactor building; shutdown of reactor equipment and systems in a protected condition to prevent deterioration; and maintenance of the reactor in a defueled, protected status by a skeleton staff, which would permit any future decision to refuel and restart. Currently committed and planned upgrade activities will be discontinued for P Reactor. DOE will proceed with the safety upgrades and management system improvements currently scheduled for K Reactor in its program to satisfy the criteria of the Safety Evaluation Report (SER), and will conduct an Operational Readiness Review (ORR). The satisfaction of the SER criteria and completion of the ORR will demonstrate that the safety and health criteria for the resumption of production have been met. Reactor restart is expected to be in the third quarter of 1991 for K Reactor

  5. Temperature Effects of Point Sources, Riparian Shading, and Dam Operations on the Willamette River, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2007-01-01

    to within about 0.005 degrees Celsius (?C). In addition to assessing the effects of point-source heat trades, the models were used to evaluate the temperature effects of several shade-restoration scenarios. Restoration of riparian shade along the entire Long Tom River, from its mouth to Fern Ridge Dam, was calculated to have a small but significant effect on daily maximum temperatures in the main-stem Willamette River, on the order of 0.03?C where the Long Tom River enters the Willamette River, and diminishing downstream. Model scenarios also were run to assess the effects of restoring selected 5-mile reaches of riparian vegetation along the main-stem Willamette River from river mile (RM) 176.80, just upstream of the point where the McKenzie River joins the Willamette River, to RM 116.87 near Albany, which is one location where cumulative point-source heating effects are at a maximum. Restoration of riparian vegetation along the main-stem Willamette River was shown by model runs to have a significant local effect on daily maximum river temperatures (0.046 to 0.194?C) at the site of restoration. The magnitude of the cooling depends on many factors including river width, flow, time of year, and the difference in vegetation characteristics between current and restored conditions. Downstream of the restored reach, the cooling effects are complex and have a nodal nature: at one-half day of travel time downstream, shade restoration has little effect on daily maximum temperature because water passes the restoration site at night; at 1 full day of travel time downstream, cooling effects increase to a second, diminished maximum. Such spatial complexities may complicate the trading of heat allocations between point and nonpoint sources. Upstream dams have an important effect on water temperature in the Willamette River system as a result of augmented flows as well as modified temperature releases over the course of the summer and autumn. The TMDL was formulated prior t

  6. Two operating modes for turbocharger system

    International Nuclear Information System (INIS)

    Bayomi, Nazih N.; Abd El-Maksoud, Rafea M.

    2012-01-01

    Highlights: ► A turbocharger system that operates in power assisted mode is introduced. ► The parameters affecting performance of the turbocharger is presented. ► Different operational charts for turbocharger are presented. ► The parametric study is helpful guide to determine turbocharger dimensioning. - Abstract: The present paper introduces a turbocharger system that operates in two different modes according to turbocharging requirements. In the first mode, the turbocharger is operating with power assistance at lower engine speeds where the power of the exhaust gases is insufficient. Thereafter, the second mode is switched leading the compressor and the turbine of the turbocharger to rotate separately for best performance. Analysis is presented to find out the parameters affecting the operation of the turbocharger and their values to achieve enhanced turbocharger performance with high efficient impellers. The parameters studied are based on data of the turbocharger operating conditions and the operational requirements of the engine. The analysis considers the turbocharger system, its turbine and its compressor. The operational charts demonstrate the simulated results for two operating modes. This study is helpful as a guide to determine the turbocharger dimensioning and blade profile assignment without using any given blade dimensional value.

  7. Expert systems to assist plant operation

    International Nuclear Information System (INIS)

    Matsumoto, Yoshihiro; Mori, Nobuyuki; Wada, Norio

    1985-01-01

    Large-scale real-time process control systems, such as those for electric power dispatching, large thermal and nuclear power stations, steel mill plants and manufacturing automation systems, need expert systems to assist operator's decision. The expert systems newly developed to fulfill the requirement are founded on OKBS (object oriented knowledge based system). OKBS provides various object types: fuzzy logic type, production rule type, frame type, state transition type, abstract data type and input/output transformation type. (author)

  8. Operationalizing safe operating space for regional social-ecological systems.

    Science.gov (United States)

    Hossain, Md Sarwar; Dearing, John A; Eigenbrod, Felix; Johnson, Fiifi Amoako

    2017-04-15

    This study makes a first attempt to operationalize the safe operating space concept at a regional scale by considering the complex dynamics (e.g. non-linearity, feedbacks, and interactions) within a systems dynamic model (SD). We employ the model to explore eight 'what if' scenarios based on well-known challenges (e.g. climate change) and current policy debates (e.g. subsidy withdrawal). The findings show that the social-ecological system in the Bangladesh delta may move beyond a safe operating space when a withdrawal of a 50% subsidy for agriculture is combined with the effects of a 2°C temperature increase and sea level rise. Further reductions in upstream river discharge in the Ganges would push the system towards a dangerous zone once a 3.5°C temperature increase was reached. The social-ecological system in Bangladesh delta may be operated within a safe space by: 1) managing feedback (e.g. by reducing production costs) and the slow biophysical variables (e.g. temperature, rainfall) to increase the long-term resilience, 2) negotiating for transboundary water resources, and 3) revising global policies (e.g. withdrawal of subsidy) that negatively impact at regional scales. This study demonstrates how the concepts of tipping points, limits to adaptations, and boundaries for sustainable development may be defined in real world social-ecological systems. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  9. [Development of operation patient security detection system].

    Science.gov (United States)

    Geng, Shu-Qin; Tao, Ren-Hai; Zhao, Chao; Wei, Qun

    2008-11-01

    This paper describes a patient security detection system developed with two dimensional bar codes, wireless communication and removal storage technique. Based on the system, nurses and correlative personnel check code wait operation patient to prevent the defaults. The tests show the system is effective. Its objectivity and currency are more scientific and sophisticated than current traditional method in domestic hospital.

  10. Neurosurgical operating computerized tomographic scanner system

    International Nuclear Information System (INIS)

    Okudera, Hiroshi; Sugita, Kenichiro; Kobayashi, Shigeaki; Kimishima, Sakae; Yoshida, Hisashi.

    1988-01-01

    A neurosurgical operating computerized tomography scanner system is presented. This system has been developed for obtaining intra- and postoperative CT images in the operating room. A TCT-300 scanner (manufactured by the Toshiba Co., Tokyo) is placed in the operating room. The realization of a true intraoperative CT image requires certain improvements in the CT scanner and operating table. To adjust the axis of the co-ordinates of the motor system of the MST-7000 microsurgical operating table (manufactured by the Mizuho Ika Co., Tokyo) to the CT scanner, we have designed an interface and a precise motor system so that the computer of the CT scanner can directly control the movement of the operating table. Furthermore, a new head-fixation system has been designed for producing artifact-free intraoperative CT images. The head-pins of the head-fixation system are made of carbon-fiber bars and titanium tips. A simulation study of the total system in the operating room with the CT scanner, operating table, and head holder using a skull model yielded a degree of error similar to that in the phantom testing of the original scanner. Three patients underwent resection of a glial tumor using this system. Intraoperative CT scans taken after dural opening showed a bulging of the cortex, a shift in the central structure, and a displacement of the cortical subarachnoid spaces under the influence of gravity. With a contrast medium the edge of the surrounding brain after resection was enhanced and the residual tumor mass was demonstrated clearly. This system makes it possible to obtain a noninvasive intraoperative image in a situation where structural shifts are taking place. (author)

  11. CANDU 9 operator plant display system

    International Nuclear Information System (INIS)

    Trueman, R.; Webster, A.; MacBeth, M.J.

    1997-01-01

    To meet evolving client and regulatory needs, AECL has adopted an evolutionary approach to the design of the CANDU 9 control centre. That is, the design incorporates feedback from existing stations, reflects the growing diversity in the roles and responsibilities of the operating staff, and reduces costs associated with plant capital and operations, maintenance and administration (OM and A), through the appropriate introduction of new technologies. Underlying this approach is a refined engineering design process that cost-effectively integrates operational feedback and human factors engineering to define the operating staff information and information presentation requirements. Based on this approach, the CANDU 9 control centre will provide utility operating staff with the means to achieve improved operations and reduced OM and A costs. One of the design features that will contribute to the improved operational capabilities of the control centre is a new Plant Display System (PDS) that is separate from the digital control system. The PDS will be used to implement non-safety panel, and console video display systems within the CANDU 9 main control room (MCR). This paper presents a detailed description of the CANDU 9 Plant Display System and features that provide increased operational capabilities. (author)

  12. SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT

    Directory of Open Access Journals (Sweden)

    Oleynik Pavel Pavlovich

    2012-10-01

    Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined

  13. Evolution of biomolecular loadings along a major river system

    Science.gov (United States)

    Freymond, Chantal V.; Kündig, Nicole; Stark, Courcelle; Peterse, Francien; Buggle, Björn; Lupker, Maarten; Plötze, Michael; Blattmann, Thomas M.; Filip, Florin; Giosan, Liviu; Eglinton, Timothy I.

    2018-02-01

    Understanding the transport history and fate of organic carbon (OC) within river systems is crucial in order to constrain the dynamics and significance of land-ocean interactions as a component of the global carbon cycle. Fluvial export and burial of terrestrial OC in marine sediments influences atmospheric CO2 over a range of timescales, while river-dominated sedimentary sequences can provide valuable archives of paleoenvironmental information. While there is abundant evidence that the association of organic matter (OM) with minerals exerts an important influence on its stability as well as hydrodynamic behavior in aquatic systems, there is a paucity of information on where such associations form and how they evolve during fluvial transport. Here, we track total organic carbon (TOC) and terrestrial biomarker concentrations (plant wax-derived long-chain fatty acids (FA), branched glycerol dialkyl glycerol tetraethers (brGDGTs) and lignin-derived phenols) in sediments collected along the entire course of the Danube River system in the context of sedimentological parameters. Mineral-specific surface area-normalized biomarker and TOC concentrations show a systematic decrease from the upper to the lower Danube basin. Changes in OM loading of the available mineral phase correspond to a net decrease of 70-80% of different biomolecular components. Ranges for biomarker loadings on Danube River sediments, corresponding to 0.4-1.5 μgFA/m2 for long-chain (n-C24-32) fatty acids and 17-71 ngbrGDGT/m2 for brGDGTs, are proposed as a benchmark for comparison with other systems. We propose that normalizing TOC as well as biomarker concentrations to mineral surface area provides valuable quantitative constraints on OM dynamics and organo-mineral interactions during fluvial transport from terrigenous source to oceanic sink.

  14. A COMPUTERIZED OPERATOR SUPPORT SYSTEM PROTOTYPE

    Energy Technology Data Exchange (ETDEWEB)

    Thomas A. Ulrich; Roger Lew; Ronald L. Boring; Ken Thomas

    2015-03-01

    A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. A prototype COSS was developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. The initial version of the prototype is now operational at the Idaho National Laboratory using the Human System Simulation Laboratory.

  15. Intelligent vision system for autonomous vehicle operations

    Science.gov (United States)

    Scholl, Marija S.

    1991-01-01

    A complex optical system consisting of a 4f optical correlator with programmatic filters under the control of a digital on-board computer that operates at video rates for filter generation, storage, and management is described.

  16. PCOS - An operating system for modular applications

    Science.gov (United States)

    Tharp, V. P.

    1986-01-01

    This paper is an introduction to the PCOS operating system for the MC68000 family processors. Topics covered are: development history; development support; rational for development of PCOS and salient characteristics; architecture; and a brief comparison of PCOS to UNIX.

  17. What is Happening with Independent System Operators?

    Energy Technology Data Exchange (ETDEWEB)

    Porter, K. L.

    1999-02-01

    Emerging independent system operators (ISOs) appear to have many advantages for the wind power industry. This paper compares some past research on wind and transmission issues with some of the developments in ISO design and implementation.

  18. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  19. Windows XP Operating System Security Analysis

    National Research Council Canada - National Science Library

    Goktepe, Meftun

    2002-01-01

    .... The purpose of this research is to determine if Windows XP, when used as a workstation operating system in domain- based networks, provides adequate security policy enforcement for organizations...

  20. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  1. Operator Support System for Pressurized Water Reactor

    International Nuclear Information System (INIS)

    Wei Renjie; Shen Shifei

    1996-01-01

    Operator Support System for Pressurized Water Reactor (OSSPWR) has been developed under the sponsorship of IAEA from August 1994. The project is being carried out by the Department of Engineering Physics, Tsinghua University, Beijing, China. The Design concepts of the operator support functions have been established. The prototype systems of OSSPWR has been developed as well. The primary goal of the project is to create an advanced operator support system by applying new technologies such as artificial intelligence (AI) techniques, advanced communication technologies, etc. Recently, the advanced man-machine interface for nuclear power plant operators has been developed. It is connected to the modern computer systems and utilizes new high performance graphic displays. (author). 6 refs, 4 figs

  2. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  3. Research of Trust Chain of Operating System

    Science.gov (United States)

    Li, Hongjiao; Tian, Xiuxia

    Trust chain is one of the key technologies in designing secure operating system based on TC technology. Constructions of trust chain and trust models are analyzed. Future works in these directions are discussed.

  4. Visual assistance system for cyclotron operation

    International Nuclear Information System (INIS)

    Okamura, Tetsuya; Tachikawa, Toshiki; Murakami, Tohru.

    1994-01-01

    A computer-based operation system for a cyclotron which assists operators has been developed. It is the operation assistance system depending on visual sense to indicate beam parameters to operators. First, the mental model of operators at the time of beam adjustment was analyzed, and it was presumed to be composed of five partial mental models, that is, beam behavior model, feasible setting region model, parameter sensitivity model, parameter interrelation model and status map model. Next, three visual interfaces were developed. Beam trajectory is rapidly calculated and graphically displayed whenever operators change parameters. Feasible setting regions (FSR) for parameters that satisfy the beam acceptance criteria of a cyclotron are indicated. The distribution of beam current values which are the quantity for evaluating adjustment is indicated as search history. Finally, for evaluating the system effectiveness, the search time required to reach the optimum conditions was measured. In addition, the system usability was evaluated by written questionnaires. The result of experiment showed the reduction of search time by about 65%. The written questionnaires survey showed the operators highly evaluate system usability. (K.I.)

  5. Testing Infrastructure for Operating System Kernel Development

    DEFF Research Database (Denmark)

    Walter, Maxwell; Karlsson, Sven

    2014-01-01

    Testing is an important part of system development, and to test effectively we require knowledge of the internal state of the system under test. Testing an operating system kernel is a challenge as it is the operating system that typically provides access to this internal state information. Multi......-core kernels pose an even greater challenge due to concurrency and their shared kernel state. In this paper, we present a testing framework that addresses these challenges by running the operating system in a virtual machine, and using virtual machine introspection to both communicate with the kernel...... and obtain information about the system. We have also developed an in-kernel testing API that we can use to develop a suite of unit tests in the kernel. We are using our framework for for the development of our own multi-core research kernel....

  6. Advisory expert system for test rig operator

    International Nuclear Information System (INIS)

    Zielczynski, P.

    1994-01-01

    The advisory expert system MAESTRO (Modular Advisory Expert System for Test Rig Operator) has been designed to guide the operator of large experimental installation during start-up, steady state and shut down. The installation is located in the research reactor MARIA in the Institute of Atomic Energy in Swierk, Poland. The system acquires and analyses on line signals from installation and performs two tasks in real time: leading the operator and monitoring of the installation (including signal validation). Systems tasks, architecture and knowledge representation concepts are described. The system is based on expert systems techniques what makes in phases of continuous change of process parameters and it has been achieved by special knowledge representation allowing its dynamical modification. (author). 147 refs, 42 figs, 5 tab

  7. Modeling Control Situations in Power System Operations

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Singh, Sri Niwas

    2010-01-01

    for intelligent operation and control must represent system features, so that information from measurements can be related to possible system states and to control actions. These general modeling requirements are well understood, but it is, in general, difficult to translate them into a model because of the lack...... of explicit principles for model construction. This paper presents a work on using explicit means-ends model based reasoning about complex control situations which results in maintaining consistent perspectives and selecting appropriate control action for goal driven agents. An example of power system......Increased interconnection and loading of the power system along with deregulation has brought new challenges for electric power system operation, control and automation. Traditional power system models used in intelligent operation and control are highly dependent on the task purpose. Thus, a model...

  8. A distributed real-time operating system

    International Nuclear Information System (INIS)

    Tuynman, F.; Hertzberger, L.O.

    1984-07-01

    A distributed real-time operating system, Fados, has been developed for an embedded multi-processor system. The operating system is based on a host target approach and provides for communication between arbitrary processes on host and target machine. The facilities offered are, apart from process communication, access to the file system on the host by programs on the target machine and monitoring and debugging of programs on the target machine from the host. The process communication has been designed in such a way that the possibilities are the same as those offered by the Ada programming language. The operating system is implemented on a MC 68000 based multiprocessor system in combination with a Unix host. (orig.)

  9. LEVELS OF SOME ANIONS IN SOKOTO-RIMA RIVER SYSTEM IN ...

    African Journals Online (AJOL)

    user

    obtained in this work, the river water is safe for the aquatic life therein. ... environmental issue in developing countries. ... of these ions to enhance water quality of this ... IN SOKOTO-RIMA RIVER SYSTEM IN NORTH IN WESTERN NIGERIA.

  10. Army Secure Operating System: Information Security for Real Time Systems

    National Research Council Canada - National Science Library

    Anderson, Eric

    1984-01-01

    The Army Secure Operating System (ASOS) project, under the management of the U.S. Army CECOM organization, will provide real time systems software necessary for fielding modern Battlefield Automation Systems...

  11. Supervisory Control and Diagnostics System Distributed Operating System

    International Nuclear Information System (INIS)

    McGoldrick, P.R.

    1979-01-01

    This paper contains a description of the Supervisory Control and Diagnostics System (SCDS) Distributed Operating System. The SCDS consists of nine 32-bit minicomputers with shared memory. The system's main purpose is to control a large Mirror Fusion Test Facility

  12. Database/Operating System Co-Design

    OpenAIRE

    Giceva, Jana

    2016-01-01

    We want to investigate how to improve the information flow between a database and an operating system, aiming for better scheduling and smarter resource management. We are interested in identifying the potential optimizations that can be achieved with a better interaction between a database engine and the underlying operating system, especially by allowing the application to get more control over scheduling and memory management decisions. Therefore, we explored some of the issues that arise ...

  13. Laboratory QA/QC improvements for small drinking water systems at Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Turner, R.D.

    1995-12-01

    The Savannah River Site (SRS), a 310 square mile facility located near Aiken, S.C., is operated by Westinghouse Savannah River Company for the US Department of Energy. SRS has 28 separate drinking water systems with average daily demands ranging from 0.0002 to 0.5 MGD. All systems utilize treated groundwater. Until recently, the water laboratories for each system operated independently. As a result, equipment, reagents, chemicals, procedures, personnel, and quality control practices differed from location to location. Due to this inconsistency, and a lack of extensive laboratory OA/QC practices at some locations, SRS auditors were not confident in the accuracy of daily water quality analyses results. The Site`s Water Services Department addressed these concerns by developing and implementing a practical laboratory QA/QC program. Basic changes were made which can be readily adopted by most small drinking water systems. Key features of the program include: Standardized and upgraded laboratory instrumentation and equipment; standardized analytical procedures based on vendor manuals and site requirements; periodic accuracy checks for all instrumentation; creation of a centralized laboratory to perform metals digestions and chlorine colorimeter accuracy checks; off-site and on-site operator training; proper storage, inventory and shelf life monitoring for reagents and chemicals. This program has enhanced the credibility and accuracy of SRS drinking water system analyses results.

  14. Discussion of Minos Mine operating system

    Energy Technology Data Exchange (ETDEWEB)

    Pan, B.

    1991-10-01

    The MINOS (mine operating system), which is used in the majority of British collieries, provides central control at the surface for the machinery and environmental equipment distributed throughout the mine. Installed equipment, including face machinery, conveyors, pumps, fans and sensors are connected to local outstations which all communicate with the control system via a single run of signal cable. The article discusses the system particularly its use in the Automated Control System of Underground Mining Locomotives (ACSUML). The discussion includes the use of MINOS to improve wagon identification, the operating principle of ACSUML and the possibilities of a driverless locomotive. 2 figs.

  15. The transportation operations system: A description

    International Nuclear Information System (INIS)

    Best, R.E.; Danese, F.L.; Dixon, L.D.; Peterson, R.W.; Pope, R.B.

    1990-01-01

    This paper presents a description of the system for transporting radioactive waste that may be deployed to accomplish the assigned system mission, which includes accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste generator sites and transporting them to the FWMS destination facilities. The system description presented here contains, in part, irradiated fuel and waste casks, ancillary equipments, truck, rail, and barge transporters, cask and vehicle traffic management organizations, maintenance facilities, and other operations elements. The description is for a fully implemented system, which is not expected to be achieved, however, until several years after initial operations. 6 figs

  16. BIOTIC INTEGRITY OF STREAMS IN THE SAVANNAH RIVER SITE INTEGRATOR OPERABLE UNITS, 1996 TO 2003

    Energy Technology Data Exchange (ETDEWEB)

    Paller, M; Susan Dyer, S

    2004-11-08

    The Savannah River Site (SRS) has been divided into six Integrator Operable Units (IOUs) that correspond to the watersheds of the five major streams on the SRS (Upper Three Runs, Fourmile Branch, Pen Branch, Steel Creek, and Lower Three Runs) and the portions of the Savannah River and Savannah River Swamp associated with the SRS. The streams are the primary integrators within each IOU because they potentially receive, through surface or subsurface drainage, soluble contaminants from all waste sites within their watersheds. If these contaminants reach biologically significant levels, they would be expected to effect the numbers, types, and health of stream organisms. In this study, biological sampling was conducted within each IOU as a measure of the cumulative ecological effects of the waste sites within the IOUs. The use of information from biological sampling to assess environmental quality is often termed bioassessment. The IOU bioassessment program included 38 sites in SRS streams and nine sites in the Savannah River. Sampling was conducted in 1996 to 1998, 2000, and 2003. Four bioassessment methods were used to evaluate ecological conditions in the IOU streams: the Index of Biotic Integrity, the Fish Health Assessment Index, measurement of fish tissue contaminant levels, and two benthic macroinvertebrate indices. The Index of Biotic Integrity (IBI) is an EPA supported method based on comparison of ecologically important and sensitive fish assemblage variables between potentially disturbed and reference (i.e., undisturbed) sites. It is designed to assess the ability of a stream to support a self-sustaining biological community and ecological processes typical of undisturbed, natural conditions. Since many types of contaminants can bioaccumulate, fish tissue contaminant data were used to determine the types of chemicals fish were exposed to and their relative magnitudes among IOUs. The Fish Health Assessment Index (HAI) is an EPA supported method for assessing

  17. Effective operator formalism for open quantum systems

    DEFF Research Database (Denmark)

    Reiter, Florentin; Sørensen, Anders Søndberg

    2012-01-01

    We present an effective operator formalism for open quantum systems. Employing perturbation theory and adiabatic elimination of excited states for a weakly driven system, we derive an effective master equation which reduces the evolution to the ground-state dynamics. The effective evolution...... involves a single effective Hamiltonian and one effective Lindblad operator for each naturally occurring decay process. Simple expressions are derived for the effective operators which can be directly applied to reach effective equations of motion for the ground states. We compare our method...

  18. A system dynamics approach for integrated management of the Jucar River Basin

    Science.gov (United States)

    Rubio-Martin, Adria; Macian-Sorribes, Hector; Pulido-Velazquez, Manuel

    2017-04-01

    System dynamics (SD) is a modelling approach that allows the analysis of complex systems through the mathematical definition of variables and their relationships. Based on systems thinking, SD is suitable for interdisciplinary studies of the management of complex systems. Over the past 50 years, SD tools have been applied to fields as diverse as economics, ecology, politics, sociology and resource management. Its application to the field of water resources has grown significantly over the last two decades, facilitating the enhancement of models by adding social, economic and ecological components. However, its application to the operation of complex multireservoir systems has been very limited so far. In this contribution, we have developed a SD model for the Jucar River Basin, one of the most vulnerable basins in the western Mediterranean region with regard to droughts. The system has three main reservoirs, which allows for a multiannual management of the storage that compensates the highly variable streamflow from upstream. Our SD model of the Jucar River Basin is able to capture the complexity of the water resource system. The model developed consists of five interlinked subsystems: a) Topology of the system network, including the 3 main reservoirs, water seepage and evaporation, inflows and catchments. b) Monthly operating rules of each reservoir. The rules were derived from the expert knowledge eluded from the operators of the reservoirs. c) Monthly urban, agricultural and environmental water demands. d) State index of the system and drought mitigation measures triggered depending on the state index. e) Mancha Oriental aquifer and stream-aquifer interaction with the Jucar River. The comparison between observed and simulated series showed that the model provides a good representation of the observed reservoir operation and total deficits. The interdisciplinary and open nature of the methodology allows to add new variables and dynamics to the model that are

  19. Method and Apparatus Providing Deception and/or Altered Operation in an Information System Operating System

    Science.gov (United States)

    Cohen, Fred; Rogers, Deanna T.; Neagoe, Vicentiu

    2008-10-14

    A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.

  20. Development and application of a large scale river system model for National Water Accounting in Australia

    Science.gov (United States)

    Dutta, Dushmanta; Vaze, Jai; Kim, Shaun; Hughes, Justin; Yang, Ang; Teng, Jin; Lerat, Julien

    2017-04-01

    Existing global and continental scale river models, mainly designed for integrating with global climate models, are of very coarse spatial resolutions and lack many important hydrological processes, such as overbank flow, irrigation diversion, groundwater seepage/recharge, which operate at a much finer resolution. Thus, these models are not suitable for producing water accounts, which have become increasingly important for water resources planning and management at regional and national scales. A continental scale river system model called Australian Water Resource Assessment River System model (AWRA-R) has been developed and implemented for national water accounting in Australia using a node-link architecture. The model includes major hydrological processes, anthropogenic water utilisation and storage routing that influence the streamflow in both regulated and unregulated river systems. Two key components of the model are an irrigation model to compute water diversion for irrigation use and associated fluxes and stores and a storage-based floodplain inundation model to compute overbank flow from river to floodplain and associated floodplain fluxes and stores. The results in the Murray-Darling Basin shows highly satisfactory performance of the model with median daily Nash-Sutcliffe Efficiency (NSE) of 0.64 and median annual bias of less than 1% for the period of calibration (1970-1991) and median daily NSE of 0.69 and median annual bias of 12% for validation period (1992-2014). The results have demonstrated that the performance of the model is less satisfactory when the key processes such as overbank flow, groundwater seepage and irrigation diversion are switched off. The AWRA-R model, which has been operationalised by the Australian Bureau of Meteorology for continental scale water accounting, has contributed to improvements in the national water account by substantially reducing accounted different volume (gain/loss).

  1. Selenium concentrations and loads from coal mining operations in the Elk River Watershed, Southeastern BC : 2004-2009

    International Nuclear Information System (INIS)

    Paine, M.; Orr, P.; Franklin, W.; Fraser, C.

    2010-01-01

    This presentation reported on a study in which selenium concentrations were measured at 27 receiving and 40 discharge water stations in British Columbia's Elk River watershed, where Teck Coal Ltd. operates 5 coal mines. Monthly measurements were taken in the Elk River and its major tributaries from 2004 to 2009 to evaluate trends for selenium concentrations in receiving waters, and for concentrations and loads at selected discharges. Selenium concentrations were found to be much higher than background levels of 1 g/L in areas downstream of mine discharges in the Fording River, Line Creek, Michel Creek and in the lower Elk River below its confluence with the Fording River. Concentrations increased considerably over time in the Fording and lower Elk Rivers, and in Line Creek. Most of the selenium loads discharged to the Elk River and its tributaries were found to originate from less than 10 major sources. Concentrations increased with time at most major sources. At some sources, selenium loads increased with time, but decreased at others. The increase in concentrations in the lower Elk River and at several major sources from 2007 to 2009 may be attributed in part to a decrease in flow. Options for reducing selenium loads discharged to downstream receiving waters are being investigated by the mines.

  2. Operating system concepts for embedded multicores

    OpenAIRE

    Horst, Oliver; Schmidt, Adriaan

    2014-01-01

    Currently we can see an increasing adoption of multi-core platforms in the area of embedded systems. While these new hardware platforms offer the potential to satisfy the ever increasing demand for computational power, they pose considerable challenges with regard to software development. This affects the application software itself, but also the system design and architecture. Here, we address the consequences for operating system architecture in embedded systems. After dis-cussing current a...

  3. Automated Operations Development for Advanced Exploration Systems

    Science.gov (United States)

    Haddock, Angie T.; Stetson, Howard

    2012-01-01

    Automated space operations command and control software development and its implementation must be an integral part of the vehicle design effort. The software design must encompass autonomous fault detection, isolation, recovery capabilities and also provide "single button" intelligent functions for the crew. Development, operations and safety approval experience with the Timeliner system onboard the International Space Station (ISS), which provided autonomous monitoring with response and single command functionality of payload systems, can be built upon for future automated operations as the ISS Payload effort was the first and only autonomous command and control system to be in continuous execution (6 years), 24 hours a day, 7 days a week within a crewed spacecraft environment. Utilizing proven capabilities from the ISS Higher Active Logic (HAL) System, along with the execution component design from within the HAL 9000 Space Operating System, this design paper will detail the initial HAL System software architecture and interfaces as applied to NASA's Habitat Demonstration Unit (HDU) in support of the Advanced Exploration Systems, Autonomous Mission Operations project. The development and implementation of integrated simulators within this development effort will also be detailed and is the first step in verifying the HAL 9000 Integrated Test-Bed Component [2] designs effectiveness. This design paper will conclude with a summary of the current development status and future development goals as it pertains to automated command and control for the HDU.

  4. Environmental and ecological water requirement of river system: a case study of Haihe-Luanhe river system

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    In order to reduce the environmental and ecological problems induced by water resources development and utilization, this paper proposes a concept of environmental and ecological water requirement. It is defined as the minimum water amount to be consumed by the natural water bodies to conserve its environmental and ecological functions. Based on the definition, the methods on calculating the amount of environmental and ecological water requirement are determined. In the case study on Haihe-Luanhe river system, the water requirement is divided into three parts, i.e., the basic in-stream flow, water requirement for sediment transfer and water consumption by evaporation of the lakes or everglades. The results of the calculation show that the environmental and ecological water requirement in the river system is about 124×108 m3, including 57×108 m3 for basic in-stream flow, 63×108m3 for sediment transfer and 4×l08m3 for net evaporation loss of lakes. The total amount of environmental and ecological water requirement accounts for 54% of the amount of runoff (228×108 m3). However, it should be realized that the amount of environmental and ecological water requirement must be more than that we have calculated. According to this result, we consider that the rational utilization rate of the runoff in the river systems must not be more than 40%. Since the current utilization rate of the river system, which is over 80%, has been far beyond the limitation, the problems of environment and ecology are quite serious. It is imperative to control and adjust water development and utilization to eliminate the existing problems and to avoid the potential ecological or environmental crisis.

  5. Experiences in Regional Cross Border Co-operation in River Management. Comparing Three Cases at the Dutch–German Border

    NARCIS (Netherlands)

    Wiering, M.A.; Verwijmeren, J.A.; Lulofs, K.; Feld, C.

    2010-01-01

    Cross border co-operation is increasingly viewed as an obvious and logical consequence of an integrated perspective on river management. Consequently, we would expect an increase of cross border co-operation and collaboration in EU member states, through joint planning, co-management or

  6. Expert system aided operator's mental activities training

    International Nuclear Information System (INIS)

    Gieci, A.; Macko, J.; Mosny, J.; Gese, A.

    1994-01-01

    The operator's mental activity is the most important part of his work. A processing of a large amount of the information by the operator is possible only if he/she possesses appropriate cognitive skills. To facilitate the novice's acquisition of the experienced operator's cognitive skills of the decision-making process a special type of the expert system was developed. The cognitive engineering's models and problem-solving methodology constitutes the basis of this expert system. The article gives an account of the prototype of the mentioned expert system developed to aid the whole mental activity of the nuclear power plant operator during his decision-making process. (author). 6 refs, 6 figs

  7. Monitoring and operation system for severe accidents

    International Nuclear Information System (INIS)

    Fukui, Toshiki; Niida, Shinji; Kato, Yumeto

    2017-01-01

    Monitoring and operation system for Severe Accidents (SA-MOS) is a compact Instrumentation and Control (I and C) system developed by Mitsubishi Heavy Industries (MHI) and certificated by the Japanese Nuclear Regulatory Agency (NRA) as a design application for Japanese existing PWR nuclear power plants. The system is tailored to provide monitoring and operation for Severe Accident (SA) conditions, and consists of digitalized I and C System, Human Systems Interface (HSI) system and Power Supply (PS) system as further improvement of reliability and safety. This design plans to be applied to the next Japanese PWR plants. In accordance with the new regulatory standards that NRA has established corresponding to the Fukushima accident, a long-term Station Black Out (SBO) scenario and 24-hours power supply by the storage battery in case of SA has been required. In order to address 24-hours power supply requirement in SA condition, the storage battery volume shall be increased. However, it may be difficult to introduce additional batteries to the existing plant site because of room space constraints, etc. Therefore, power distributions for the facilities which are only used for Design Basis Accident (DBA), are shut down in order to secure 24-hours operations of facilities for SA conditions including SA-MOS. That enables efficient battery resource operations as well as optimizes room space factors shared by battery cabinets. Another benefit is to introduce dedicate HSI system for SA condition and operators shift their operations using that dedicated HSI system to cope with SA events. That can reduce operator workload which forces operators to verify or choose which controllers and indicators are available in SA conditions. Furthermore, application of SA-MOS, secures the independence of the layers (DBA⇔SA) as well as secures the plant data transfer for SA conditions outside of plant. Those plant data assets can be shared by plant operation supporting personnel and

  8. Operating health analysis of electric power systems

    Science.gov (United States)

    Fotuhi-Firuzabad, Mahmud

    The required level of operating reserve to be maintained by an electric power system can be determined using both deterministic and probabilistic techniques. Despite the obvious disadvantages of deterministic approaches there is still considerable reluctance to apply probabilistic techniques due to the difficulty of interpreting a single numerical risk index and the lack of sufficient information provided by a single index. A practical way to overcome difficulties is to embed deterministic considerations in the probabilistic indices in order to monitor the system well-being. The system well-being can be designated as healthy, marginal and at risk. The concept of system well-being is examined and extended in this thesis to cover the overall area of operating reserve assessment. Operating reserve evaluation involves the two distinctly different aspects of unit commitment and the dispatch of the committed units. Unit commitment health analysis involves the determination of which unit should be committed to satisfy the operating criteria. The concepts developed for unit commitment health, margin and risk are extended in this thesis to evaluate the response well-being of a generating system. A procedure is presented to determine the optimum dispatch of the committed units to satisfy the response criteria. The impact on the response wellbeing being of variations in the margin time, required regulating margin and load forecast uncertainty are illustrated. The effects on the response well-being of rapid start units, interruptible loads and postponable outages are also illustrated. System well-being is, in general, greatly improved by interconnection with other power systems. The well-being concepts are extended to evaluate the spinning reserve requirements in interconnected systems. The interconnected system unit commitment problem is decomposed into two subproblems in which unit scheduling is performed in each isolated system followed by interconnected system evaluation

  9. Use of aerial videography to evaluate the effects of Flaming Gorge Dam operations on natural resources of the Green River

    International Nuclear Information System (INIS)

    Snider, M.A.; Hayse, J.W.; Hlohowskyj, I.; LaGory, K.E.; Greaney, M.M.; Kuiper, J.A.; Van Lonkhuyzen, R.A.

    1993-01-01

    Peaking hydropower operations can profoundly alter natural stream flow and thereby affect the natural resources dependent on these flows. In this paper, we describe how aerial videography was used to collect environmental data and evaluate impacts of hydropower operations at Flaming Gorge Dam on natural resources of the Green River. An airborne multispectral video/radiometer remote sensing system was used to collect resource data under four different flow conditions from seven sites (each about one mile in length) located downstream from the dam. Releases from Flaming Gorge Dam during data collection ranged from approximately 800 to 4,000 cubic feet/sec (cfs), spanning most of the normal operating range for this facility. For each site a series of contiguous, non-overlapping images was prepared from the videotapes and used to quantify surface water area, backwater habitats, and areas of riparian vegetation under varying flow conditions. From this information, relationships between flow and habitat parameters were developed and used in conjunction with hydrologic modeling and ecological information to evaluate impacts of various modes of operation

  10. Operator decision support system for sodium loop

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Hyeang; Park, Kyu Ho; Kim, Tak Kon; Jo, Choong Ho; Seong, Kyeong A; Lee, Keon Myeong; Kim, Yeong Dal; Kim, Chang Beom; Kim, Jong Kyu; Jo, Hee Chang; Lee, Ji Hyeong; Jeong, Yoon Soo; Chio, Jong Hyeong; Jeong, Bong Joon; Hong, Joon Seong; Kim, Bong Wan; Seong, Byeong Hak [Korea Advanced Institute Science and Technology, Taejon (Korea, Republic of)

    1994-07-01

    The objective of this study is to develop an operator decision support system by computerizing the sodium circuit. This study developed graphical display interface for the control panel which provides the safety control of equipment, the recognition of experimental process states and sodium circuit states. In this study, basic work to develop an operator decision support real-time expert system for sodium loop was carried out. Simplification of control commands and effective operation of various real-time data and signals by equipment code standardization are studied. The cost ineffectiveness of the single processor structure provides the ground for the development of cost effective parallel processing system. The important tasks of this study are (1) design and implementation of control state surveillance panel of sodium loop, (2) requirement analysis of operator support real-time expert system for sodium loop, (3) design of standard code rule for operating equipment and research on the cost effective all purpose parallel processing system and (4) requirement analysis of expert system and design of control state variables and user interface for experimental process. 10 refs., 36 figs., 20 tabs.

  11. Water Quality Projects Summary for the Mid-Columbia and Cumberland River Systems

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hadjerioua, Boualem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-04-01

    Scheduling and operational control of hydropower systems is accompanied with a keen awareness of the management of water use, environmental effects, and policy, especially within the context of strict water rights policy and generation maximization. This is a multi-objective problem for many hydropower systems, including the Cumberland and Mid-Columbia river systems. Though each of these two systems have distinct operational philosophies, hydrologic characteristics, and system dynamics, they both share a responsibility to effectively manage hydropower and the environment, which requires state-of-the art improvements in the approaches and applications for water quality modeling. The Department of Energy and Oak Ridge National Laboratory have developed tools for total dissolved gas (TDG) prediction on the Mid-Columbia River and a decision-support system used for hydropower generation and environmental optimization on the Cumberland River. In conjunction with IIHR - Hydroscience & Engineering, The University of Iowa and University of Colorado s Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), ORNL has managed the development of a TDG predictive methodology at seven dams along the Mid-Columbia River and has enabled the ability to utilize this methodology for optimization of operations at these projects with the commercially available software package Riverware. ORNL has also managed the collaboration with Vanderbilt University and Lipscomb University to develop a state-of-the art method for reducing high-fidelity water quality modeling results into surrogate models which can be used effectively within the context of optimization efforts to maximize generation for a reservoir system based on environmental and policy constraints. The novel contribution of these efforts is the ability to predict water quality conditions with simplified methodologies at the same level of accuracy as more complex and resource intensive computing methods

  12. Current and Future Flight Operating Systems

    Science.gov (United States)

    Cudmore, Alan

    2007-01-01

    This viewgraph presentation reviews the current real time operating system (RTOS) type in use with current flight systems. A new RTOS model is described, i.e. the process model. Included is a review of the challenges of migrating from the classic RTOS to the Process Model type.

  13. The evolution of a distributed operating system

    NARCIS (Netherlands)

    van Renesse, Robbert; Tanenbaum, Andrew S.; Mullender, Sape J.; Schröder-Preikschat, Wolfgang; Zimmer, Wolfgang

    AMOEBA is a research project to build a true distributed operating system using the object model. Under the COST11-ter MANDIS project this work was extended to cover wide-area networks. Besides describing the system, this paper discusses the successive versions in the implementation of its model,

  14. A diagnosis system for plant operation support

    International Nuclear Information System (INIS)

    Sundheimer, S.; Lorenzetti, J.; Lamana, C.

    1990-01-01

    The present article describes a diagnosis system for abnormal power plant events. The design is modular and uses a shell written in C languaje and a knowledge basis that can be changed easily. At present the system works with a reduced knowledge for primary and secondery leacks. The mitigation procedure is being written with the help of operation staff

  15. The operation of the GANIL control system

    International Nuclear Information System (INIS)

    Prome, M.; David, L.; Lecorche, E.

    1984-06-01

    When the first GANIL beams were obtained the control system was operating in an elementary way; the system behaved almost like a huge multiplexer. Now a large number of programs have been written; they allow to take benefit of the full power of the computers; they help the operators for starting, tuning and monitoring the accelerator. The paper gives a general description of these programs which are executed on the central computer: it shows how the accelerator is controlled either directly or via dedicated microprocessors. Informations are also given on the alarm system

  16. Operating experience feedback report - Air systems problems

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1987-12-01

    This report highlights significant operating events involving observed or potential failures of safety-related systems in U.S. plants that resulted from degraded or malfunctioning non-safety grade air systems. Based upon the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) concludes that the issue of air systems problems is an important one which requires additional NRC and industry attention. This report also provides AEOD's recommendations for corrective actions to deal with the issue. (author)

  17. UNIVERSAL INTERFACE TO MULTIPLE OPERATIONS SYSTEMS

    DEFF Research Database (Denmark)

    Sonnenwald, Diane H.

    1986-01-01

    Alternative ways to provide access to operations systems that maintain, test, and configure complex telephone networks are being explored. It is suggested that a universal interface that provides simultaneous access to multiple operations systems that execute in different hardware and software...... environments, can be provided by an architecture that is based on the separation of presentation issues from application issues and on a modular interface management system that consists of a virtual user interface, physical user interface, and interface agent. The interface functionality that is needed...

  18. Advanced smartgrids for distribution system operators

    CERN Document Server

    Boillot, Marc

    2014-01-01

    The dynamic of the Energy Transition is engaged in many region of the World. This is a real challenge for electric systems and a paradigm shift for existing distribution networks. With the help of "advanced" smart technologies, the Distribution System Operators will have a central role to integrate massively renewable generation, electric vehicle and demand response programs. Many projects are on-going to develop and assess advanced smart grids solutions, with already some lessons learnt. In the end, the Smart Grid is a mean for Distribution System Operators to ensure the quality and the secu

  19. Autonomous System Technologies for Resilient Airspace Operations

    Science.gov (United States)

    Houston, Vincent E.; Le Vie, Lisa R.

    2017-01-01

    Increasing autonomous systems within the aircraft cockpit begins with an effort to understand what autonomy is and developing the technology that encompasses it. Autonomy allows an agent, human or machine, to act independently within a circumscribed set of goals; delegating responsibility to the agent(s) to achieve overall system objective(s). Increasingly Autonomous Systems (IAS) are the highly sophisticated progression of current automated systems toward full autonomy. Working in concert with humans, these types of technologies are expected to improve the safety, reliability, costs, and operational efficiency of aviation. IAS implementation is imminent, which makes the development and the proper performance of such technologies, with respect to cockpit operation efficiency, the management of air traffic and data communication information, vital. A prototype IAS agent that attempts to optimize the identification and distribution of "relevant" air traffic data to be utilized by human crews during complex airspace operations has been developed.

  20. Smart Operations in Distributed Energy Resources System

    Science.gov (United States)

    Wei, Li; Jie, Shu; Zhang-XianYong; Qing, Zhou

    Smart grid capabilities are being proposed to help solve the challenges concerning system operations due to that the trade-offs between energy and environmental needs will be constantly negotiated while a reliable supply of electricity needs even greater assurance in case of that threats of disruption have risen. This paper mainly explores models for distributed energy resources system (DG, storage, and load),and also reviews the evolving nature of electricity markets to deal with this complexity and a change of emphasis on signals from these markets to affect power system control. Smart grid capabilities will also impact reliable operations, while cyber security issues must be solved as a culture change that influences all system design, implementation, and maintenance. Lastly, the paper explores significant questions for further research and the need for a simulation environment that supports such investigation and informs deployments to mitigate operational issues as they arise.

  1. Operator approach to linear control systems

    CERN Document Server

    Cheremensky, A

    1996-01-01

    Within the framework of the optimization problem for linear control systems with quadratic performance index (LQP), the operator approach allows the construction of a systems theory including a number of particular infinite-dimensional optimization problems with hardly visible concreteness. This approach yields interesting interpretations of these problems and more effective feedback design methods. This book is unique in its emphasis on developing methods for solving a sufficiently general LQP. Although this is complex material, the theory developed here is built on transparent and relatively simple principles, and readers with less experience in the field of operator theory will find enough material to give them a good overview of the current state of LQP theory and its applications. Audience: Graduate students and researchers in the fields of mathematical systems theory, operator theory, cybernetics, and control systems.

  2. The Launch Systems Operations Cost Model

    Science.gov (United States)

    Prince, Frank A.; Hamaker, Joseph W. (Technical Monitor)

    2001-01-01

    One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to

  3. Modern Sedimentation off the Kaoping River, SW Taiwan: A Comparison with Eel River's S2S System

    Science.gov (United States)

    Huh, C.; Lin, H.; Lin, S.

    2006-12-01

    The Kaoping (KP) River in SW Taiwan has a watershed area of 3257 km2 and an annual sediment discharge of 49 MT. Although the sediment yield of the KP River basin (1.5×104 ton km-2 yr^{- 1}) is the 4th highest among Taiwan's catchment basins, it is nearly one order of magnitude higher than that of the Eel River's basin (~1.8×103 ton km-2 yr-1; the highest in the U.S.). The KP canyon extends almost immediately seaward from the river's mouth and terminates in the northwestern corner of the South China Sea. The head of the canyon is characterized by high and steep walls exceeding 600 m. The KP river's source-to-sink system offers a dramatic case of mountainous rivers at active margins for S2S study. Here we report some results about modern sedimentation in KP river's dispersal system. Seventy-six sediment cores collected from an area of ~3000 km2 were analyzed for fallout nuclides 7Be, 137Cs and 210Pb by gamma spectrometry. From profiles of excess 210Pb and 137Cs sediment accumulation rates in the coring sites were estimated, which vary from 0.06 to 1.6 cm/yr, with the highest rates (>1 cm/yr) distributed in the upper slope (exported out of the study area via the KP canyon to the deep sea by gravity-driven turbidity or hyperpycnal flows.

  4. Adaptation potential to climate change of the Peribonka River (Quebec, Canada) water resources system

    International Nuclear Information System (INIS)

    Minville, M.; Krau, S.; Brissette, F.; Leconte, R.

    2008-01-01

    This study investigated the influence of climatic change on the Peribonka water resources system. The impacts of climatic change on hydroelectric power reservoir operations in the region were assessed using a set of operating rules optimized for future hydrological regimes. Thirty climate change projections from 5 climate models, 2 greenhouse gas (GHG) scenarios, and 3 temporal horizons were used in the study. Climatic change projections were then downscaled using the Delta approach and coupled to a stochastic weather generator developed to account for natural variabilities in local climates. A lumped hydrological model was used to simulate future hydrological regimes. A stochastic dynamic programming technique was then used to optimize reservoir operating rules for various time series of future river flows. The operating rules were then used in conjunction with a river system simulation tool in order to determine reservoir and hydroelectric production scenarios under different climatic change regimes. Results of the study showed significant increases in hydroelectricity production for most of the climate change projections. However, nonproductive spillage was also increased. Reservoir reliability was also reduced. tabs., figs

  5. The Advanced Technology Operations System: ATOS

    Science.gov (United States)

    Kaufeler, J.-F.; Laue, H. A.; Poulter, K.; Smith, H.

    1993-01-01

    Mission control systems supporting new space missions face ever-increasing requirements in terms of functionality, performance, reliability and efficiency. Modern data processing technology is providing the means to meet these requirements in new systems under development. During the past few years the European Space Operations Centre (ESOC) of the European Space Agency (ESA) has carried out a number of projects to demonstrate the feasibility of using advanced software technology, in particular, knowledge based systems, to support mission operations. A number of advances must be achieved before these techniques can be moved towards operational use in future missions, namely, integration of the applications into a single system framework and generalization of the applications so that they are mission independent. In order to achieve this goal, ESA initiated the Advanced Technology Operations System (ATOS) program, which will develop the infrastructure to support advanced software technology in mission operations, and provide applications modules to initially support: Mission Preparation, Mission Planning, Computer Assisted Operations, and Advanced Training. The first phase of the ATOS program is tasked with the goal of designing and prototyping the necessary system infrastructure to support the rest of the program. The major components of the ATOS architecture is presented. This architecture relies on the concept of a Mission Information Base (MIB) as the repository for all information and knowledge which will be used by the advanced application modules in future mission control systems. The MIB is being designed to exploit the latest in database and knowledge representation technology in an open and distributed system. In conclusion the technological and implementation challenges expected to be encountered, as well as the future plans and time scale of the project, are presented.

  6. Soft systems methodology and the ecosystem approach: a system study of the Cooum River and environs in Chennai, India.

    Science.gov (United States)

    Bunch, Martin J

    2003-02-01

    This paper discusses the integration of soft systems methodology (SSM) within an ecosystem approach in research to support rehabilitation and management of the Cooum River and environs in Chennai, India. The Cooum is an extremely polluted urban stream. Its management is complicated by high rates of population growth, poverty, uncontrolled urban development, jurisdictional conflicts, institutional culture, flat topography, tidal action, blockage of the river mouth, and monsoon flooding. The situation is characterized by basic uncertainty about main processes and activities, and the nature of relationships among actors and elements in the system.SSM is an approach for dealing with messy or ill-structured problematic situations involving human activity. In this work SSM contributed techniques (such as "rich picture" and "CATWOE" tools) to description of the Cooum situation as a socioecological system and informed the approach itself at a theoretical level. Application of three general phases in SSM is discussed in the context of the Cooum River research: (1) problem definition and exploration of the problem situation, (2) development of conceptual models of relevant systems, and (3) the use of these to generate insight and stimulate debate about desirable and feasible change. Its use here gives weight to the statement by others that SSM would be a particularly appropriate methodology to operate the ecosystem approach. As well as informing efforts at management of the Cooum system, this work led the way to explore an adaptive ecosystem approach more broadly to management of the urban environment for human health in Chennai.

  7. Operator support system using computational intelligence techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bueno, Elaine Inacio, E-mail: ebueno@ifsp.edu.br [Instituto Federal de Educacao, Ciencia e Tecnologia de Sao Paulo (IFSP), Sao Paulo, SP (Brazil); Pereira, Iraci Martinez, E-mail: martinez@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    Computational Intelligence Systems have been widely applied in Monitoring and Fault Detection Systems in several processes and in different kinds of applications. These systems use interdependent components ordered in modules. It is a typical behavior of such systems to ensure early detection and diagnosis of faults. Monitoring and Fault Detection Techniques can be divided into two categories: estimative and pattern recognition methods. The estimative methods use a mathematical model, which describes the process behavior. The pattern recognition methods use a database to describe the process. In this work, an operator support system using Computational Intelligence Techniques was developed. This system will show the information obtained by different CI techniques in order to help operators to take decision in real time and guide them in the fault diagnosis before the normal alarm limits are reached. (author)

  8. Operator support system using computational intelligence techniques

    International Nuclear Information System (INIS)

    Bueno, Elaine Inacio; Pereira, Iraci Martinez

    2015-01-01

    Computational Intelligence Systems have been widely applied in Monitoring and Fault Detection Systems in several processes and in different kinds of applications. These systems use interdependent components ordered in modules. It is a typical behavior of such systems to ensure early detection and diagnosis of faults. Monitoring and Fault Detection Techniques can be divided into two categories: estimative and pattern recognition methods. The estimative methods use a mathematical model, which describes the process behavior. The pattern recognition methods use a database to describe the process. In this work, an operator support system using Computational Intelligence Techniques was developed. This system will show the information obtained by different CI techniques in order to help operators to take decision in real time and guide them in the fault diagnosis before the normal alarm limits are reached. (author)

  9. Embedded and real-time operating systems

    CERN Document Server

    Wang, K C

    2017-01-01

    This book covers the basic concepts and principles of operating systems, showing how to apply them to the design and implementation of complete operating systems for embedded and real-time systems. It includes all the foundational and background information on ARM architecture, ARM instructions and programming, toolchain for developing programs, virtual machines for software implementation and testing, program execution image, function call conventions, run-time stack usage and link C programs with assembly code. It describes the design and implementation of a complete OS for embedded systems in incremental steps, explaining the design principles and implementation techniques. For Symmetric Multiprocessing (SMP) embedded systems, the author examines the ARM MPcore processors, which include the SCU and GIC for interrupts routing and interprocessor communication and synchronization by Software Generated Interrupts (SGIs). Throughout the book, complete working sample systems demonstrate the design principles and...

  10. Stochastic simulation of climate change impacts on ice road operations, MacKenzie River, Northwest Territories

    International Nuclear Information System (INIS)

    Woo, Mingko; Lonergan, S.

    1990-01-01

    Winter roads constitute an important part of the transportation network in the MacKenzie Delta, the Yellowknife area, and between the MacKenzie Highway and the Canol Road. Climatic changes in the MacKenzie Valley will alter the probabilities of ice cover thickness and duration, impacting on the periods when ice road river crossings are viable. Stochastic models were developed to generate air temperature and precipitation data to analyze climate impacts on when ice road crossing of the MacKenzie River at Norman Wells is feasible. The data were employed to simulate river ice growth and decay. Several general circulation models were employed to determine the impacts of climatic change on the ice regime. For precipitation simulation, the occurrence of wet or dry days was determined from Markov chain transition probabilities. In general, the Goddard Institute of Space Studies (GISS) model predicted the largest increase in monthly precipitation and the Oregon State University (OSU) model predicted the least changes. The various scenarios indicated that the duration for vehicular traffic over ice will be significantly reduced, compared to present day Norman Wells ice crossing operation. For 20 tonne vehicles, the current duration for safe crossing averages 169±14.6 days per year, while for the OSU scenario it will be reduced to 148±14.7 days, is further reduced to 127±24.9 days for the GISS scenario, and drops to 122±21.7 days for the GFDL (General Fluid Dynamics Laboratory) scenario. 5 refs., 1 fig

  11. TESS Ground System Operations and Data Products

    Science.gov (United States)

    Glidden, Ana; Guerrero, Natalia; Fausnaugh, Michael; TESS Team

    2018-01-01

    We describe the ground system operations for processing data from the Transiting Exoplanet Survey Satellite (TESS), highlighting the role of the Science Operations Center (SOC). TESS is a spaced-based (nearly) all-sky mission, designed to find small planets around nearby bright stars using the transit method. We detail the flow of data from pixel measurements on the instrument to final products available at the Mikulski Archive for Space Telescopes (MAST). The ground system relies on a host of players to process the data, including the Payload Operations Center at MIT, the Science Processing Operation Center at NASA Ames, and the TESS Science Office, led by the Harvard-Smithsonian Center for Astrophysics and MIT. Together, these groups will deliver TESS Input Catalog, instrument calibration models, calibrated target pixels and full frame images, threshold crossing event reports, two-minute light curves, and the TESS Objects of Interest List.

  12. Requirements by the operator of supporting systems

    International Nuclear Information System (INIS)

    Grimm, E.; Lot, L.

    1996-01-01

    Requirements by the nuclear power station operator on computer support orient themselves to the various operating situations which can arise in the plant. Event-oriented or system-oriented methods of handling determine the type of support by the computer. Pure plant information in situations with few events, an intelligent alarm system in situations with many events and a guide by means of pre-prepared procedures are an aspect of the operator requirements of computer solutions. These are the themes dealt with in this paper. A further theme is the support of the operator by the ergonomics of the control room in the areas of working place, lighting, air conditioning and acoustics. (author) 4 figs

  13. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    National Research Council Canada - National Science Library

    Delacruz, Victor J

    2007-01-01

    Operational level commanders and their staffs require relevant and current joint doctrine that articulates the critical function of operational design and its role in the Joint Operation Planning Process (JOPP...

  14. PWR auxiliary systems, safety and emergency systems, accident analysis, operation

    International Nuclear Information System (INIS)

    Meyer, P.J.

    1976-01-01

    The author presents a description of PWR auxiliary systems like volume control, boric acid control, coolant purification, -degassing, -storage and -treatment system and waste processing systems. Residual heat removal systems, emergency systems and containment designs are discussed. As an accident analysis the author gives a survey over malfunctions and disturbances in the field of reactor operations. (TK) [de

  15. Driverless operation for public passenger transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Kehl, R. [Siemens AG, Erlangen (Germany). Bereich Verkehrstechnik

    2001-07-01

    The author presents the automation of new and existing lines as a possible solution to the twin problems of the growing need for public transport and the threat of collapse facing many public transport systems in the big conurbations as they wrestle against overloading. It emerges that automatic, driverless operation is a suitable approach to making systems more flexible and more attractive. Automation can increase the capacities of existing systems significantly and thus help them gain more passengers. (orig.)

  16. An operation management system for golf tournament

    OpenAIRE

    Yuan Yijun; Luo Hanwen

    2017-01-01

    In this paper,an operation management system for golf tournament is designed to calculate the beginning and finishing dates of the preparation automatically.The efficiency of management work during preparatory period,such as meetings before match and task announcement,is raised by nearly 40% after using our system than using traditional management tools or other software systems.And the probability of occurrence of delay and omission of work are controlled within 5%.It is proved to be helpful...

  17. Laboratory Information Systems Management and Operations.

    Science.gov (United States)

    Cucoranu, Ioan C

    2015-06-01

    The main mission of a laboratory information system (LIS) is to manage workflow and deliver accurate results for clinical management. Successful selection and implementation of an anatomic pathology LIS is not complete unless it is complemented by specialized information technology support and maintenance. LIS is required to remain continuously operational with minimal or no downtime and the LIS team has to ensure that all operations are compliant with the mandated rules and regulations. Copyright © 2015 Elsevier Inc. All rights reserved.

  18. Smartphone's Operating Systems and market share

    OpenAIRE

    Ferreras Andreu, Javier

    2011-01-01

    During the last decades, mobile phone’s market has changed people’s communication ways. Several technological improvements have been reached mainly in the last fifteen years, making possible to add new features to mobile phones. As devices became more popular and included new services, a market grew around them. The following pages contain a market analysis from the different members of the mobile phone’s industry: manufacturers, operating system companies, operators, developers and custom...

  19. ARCHITECTURE AND RELIABILITY OF OPERATING SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav V. Nazarov

    2018-03-01

    Full Text Available Progress in the production technology of microprocessors significantly increased reliability and performance of the computer systems hardware. It cannot be told about the corresponding characteristics of the software and its basis – the operating system (OS. Some achievements of program engineering are more modest in this field. Both directions of OS improvement (increasing of productivity and reliability are connected with the development of effective structures of these systems. OS functional complexity leads to the multiplicity of the structure, which is further enhanced by the specialization of the operating system depending on scope of computer system (complex scientific calculations, real time, information retrieval systems, systems of the automated and automatic control, etc. The functional complexity of the OS leads to the complexity of its architecture, which is further enhanced by the specialization of the operating system, depending on the computer system application area (complex scientific calculations, real-time, information retrieval systems, automated and automatic control systems, etc.. That fact led to variety of modern OS. It is possible to estimate reliability of different OS structures only as results of long-term field experiment or simulation modeling. However it is most often unacceptable because of time and funds expenses for carrying out such research. This survey attempts to evaluate the reliability of two main OS architectures: large multi-layered modular core and a multiserver (client-server system. Represented by continuous Markov chains which are explored in the stationary mode on the basis of transition from systems of the differential equations of Kolmogorov to system of the linear algebraic equations, models of these systems are developed.

  20. Priority ranking of safety-related systems for structural assessment at Savannah River Site

    International Nuclear Information System (INIS)

    Kao, G.C.; Daugherty, W.L.; Barnes, D.M.

    1993-01-01

    In order to extend the service life of safety related structures and systems in a logical manner, a Structural Enhancement Program was initiated to evaluate the structural integrity of eight systems, namely: cooling water system, emergency cooling system, moderator recovery system, supplementary safety system, water removal system, service raw water system, service clarified water system, and river water system. Since the level of importance of each system to reactor operations varies from one system to another, the scope of structural integrity evaluation for each system should be prioritized accordingly. This paper presents the assessment of system priority for structural evaluation based on a ranking methodology and specifies the level of structural evaluation consistent with the established priority. The effort was undertaken by a five-member panel representing four major disciplines, including: structures, reactor engineering/operations, risk management, and materials. The above systems were divided into a total of thirty-five subsystems. These subsystems were then ranked with six attributes, namely: safety classification, degradation mechanisms, difficulty of replacement, failure mode, radiation dose to workers, and consequence of failure. Each attribute was assigned a set of consequences or events with corresponding weighting scores. The results of the ranking process yielded two groups of subsystems, categorized as Priority I and II subsystems. The level of structural assessment was then formulated accordingly. The prioritized approach will allow more efficient allocation of resources, so that the Structural Enhancement Program can be implemented in a cost-effective and efficient manner

  1. Priority ranking of safety-related systems for structural enhancement assessment at Savannah River Site

    International Nuclear Information System (INIS)

    Kao, G.C.; Daugherty, W.L.; Barnes, D.M.

    1992-09-01

    In order to extend the service life of safety related structures and systems in a logical manner, a Structural Enhancement Program was initiated to evaluate the structural integrity of eight (8) systems, namely: Cooling Water System, Emergency Cooling System, Moderator Recovery System supplementary Safety System, Water Removal System, Service Raw Water System, Service Clarified Water System, and River Water System. Since the level of importance of each system to reactor operations varies from one system to another, the scope of structural integrity evaluation for each system should be prioritized accordingly. This paper presents the assessment of system priority for structural evaluation based on a ranking methodology and specifies the level of structural evaluation consistent with the established priority. The effort was undertaken by a five-member panel representing four (4) major disciplines, including. structures, reactor engineering/operations, risk management and materials. The above systems were divided into a total of thirty-five (35) subsystem. These subsystems were then ranked with six (6) attributes, namely: Safety Classification, Degradation Mechanisms, Difficulty of Replacement, Failure Mode, Radiation Dose to Workers and Consequence of Failure. Each attribute was assigned a set of consequences or events with corresponding weighting scores. The results of the ranking process yielded two groups of subsystems, categorized as Priority I and II subsystems. The level of structural assessment was then formulated accordingly. The prioritized approach will allow more efficient allocation of resources, so that the Structural Enhancement Program can be implemented in a cost-effective and efficient manner

  2. Land application of waste waters in the Alligator Rivers region, Northern Territory - environmental constraints on design and operation

    International Nuclear Information System (INIS)

    Kearns, A.

    1986-01-01

    The existing uranium mines in the Alligator River Region presently operate under a no release water management regime for water stored within the designated restricted release zones (RRZ). This water is of variable quality ranging from rainwater influenced by runoff from the mill sites and ore stockpiles to mill process water stored within the trailings repositories. There is a pressing need to reduce the volume of stored RRZ water at Nabarlek as a prerequisite to decommissioning. There is also a requirement at Ranger to rapidly reduce the volume of stored water in the mine pit at the end of the season to allow the mining of ore. Land application of RRZ water by spray irrigation has been investigated at both sites because it offers the benefits of applying chemical constituents in the wastewater within a clearly defined irrigation area. the environmental planning for the design of a land application system involves calculations of the chemical load in the wastewater and evaluation of the assimilative capacity of the soil-plant system. The monsoon climate, lateritic soil and fluctuating water table creates a unique set of environmental constraints and conditions in which to design and operate a successful land application system for the treatment of stored water at minesites within ecologically sensitive areas

  3. National-local land-use conflicts in floodways of the Mississippi River system

    Directory of Open Access Journals (Sweden)

    G Mathias Kondolf

    2018-02-01

    Full Text Available Conflicts between national and local governments over land use in floodplains have been well documented in the US and elsewhere. The US National Flood Insurance Program offers subsidized flood insurance to communities that agree to prevent further development in floodplains, but the requirements are poorly enforced and local governments are commonly reluctant to restrain development on flood-prone lands. In this paper we highlight this problem in particularly sensitive areas: the floodways (or flood bypasses that are essential components of the Mississippi River flood control system. To properly operate the flood control system, the US Army Corps of Engineers must be able to divert flow from the mainstem Mississippi into the bypasses, thereby lowering stage in the main river, and thus minimizing flooding of cities and other vulnerable areas. However, operation of the Birds-Point-New Madrid Floodway in Missouri was compromised in 2011 by local opposition (and a legal challenge ultimately rejected by the US Supreme Court, and it was finally used to accommodate floodwaters. The West Atchafalaya Floodway in Louisiana experienced a threefold increase in the number of structures within the floodway from about 1970 to 2010. Because of the pattern of flooding, the West Atchafalaya Floodway was not needed in 2011, but if it is needed in the future, its operation may be compromised by the extensive encroachments within the floodway. Thus, operation of critical national infrastructure, designed to deal with floods on an interstate, river-basin scale, is compromised by land-use decisions made at the local level.

  4. [Controlling systems for operating room managers].

    Science.gov (United States)

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  5. A lightning prevention system for nuclear operations

    International Nuclear Information System (INIS)

    Lanzoni, J.A.; Carpenter, R.B.; Tinsley, R.H.

    1994-01-01

    Lightning presents a significant threat to the uninterrupted operation of nuclear power generation facilities. There exists two categories of lightning protection systems-collectors and preventors. Collectors are air terminals, overhead shield wires and other devices designed to collect incoming lightning strikes. Preventors, on the other hand, lower the electrical potential between a thundercloud and ground to a level lower than that required to collect a strike. The Dissipation Array reg-sign Systems prevents lightning strikes from terminating in the protected area, consequently eliminating both the direct hazard and indirect effects of lightning. Over 1,600 Dissipation Array reg-sign Systems are currently in service, with more than 10,500 system-years of operating experience and a historical success rate of over ninety-nine percent. Lightning Eliminators ampersand Consultants has fulfilled 24 contracts for Dissipation Array reg-sign Systems at nuclear power generation facilities

  6. Operational experience with the CEBAF control system

    International Nuclear Information System (INIS)

    Hovater, C.; Chowdhary, M.; Karn, J.; Tiefenback, M.; Zeijts, J. van; Watson, W.

    1996-01-01

    The CEBAF accelerator at Thomas Jefferson National Accelerator Facility (Jefferson Lab) successfully began its experimental nuclear physics program in November of 1995 and has since surpassed predicted machine availability. Part of this success can be attributed to using the EPICS (Experimental Physics and Industrial Control System) control system toolkit. The CEBAF control system is one of the largest accelerator control system now operating. It controls approximately 338 SRF cavities, 2,300 magnets, 500 beam position monitors and other accelerator devices, such as gun hardware and other beam monitoring devices. All told, the system must be able to access over 125,000 database records. The system has been well received by both operators and the hardware designers. The EPICS utilities have made the task of troubleshooting systems easier. The graphical and test-based creation tools have allowed operators to custom build control screens. In addition, the ability to integrate EPICS with other software packages, such as Tcl/Tk, has allowed physicists to quickly prototype high-level application programs, and to provide GUI front ends for command line driven tools. Specific examples of the control system applications are presented in the areas of energy and orbit control, cavity tuning and accelerator tune up diagnostics

  7. Integrated forecast system atmospheric - hydrologic - hydraulic for the Urubamba river basin

    Energy Technology Data Exchange (ETDEWEB)

    Metzger, L [Peruvian National Weather Service, Lima (Peru); Carrillo, M; Diaz, A; Coronado, J; Fano, G [Peruvian National Weather Service, Lima (Peru)

    2004-07-01

    Full text: During the months of December to March, Peru is affected by intense precipitations which generate every year land slides and floods mainly in low and middle river basins of the western and Eastern of the Andes, places that exhibit the greatest number of population and productive activities. These extreme events are favored by the steep slopes that characterize the Peruvian topography. For this reason at the end of year 2000, SENAMHI began the design of a monitoring, analysis and forecast system, that had the capacity to predict the occurrence of adverse events on the low and middle river basins of the main rivers such as Piura river in the north of Peru and the Rimac river in the capital of the country. The success of this system opened the possibilities of developing similar systems throughout the country and extend to different users or sectors such as: energy, water management, river transport, etc. An example of a solution prepared for a user (the gas extraction company Pluspetrol) was the implementation of a river level forecasting system in the Urubamba river to support river navigation in this amazonic river where water level variability turns risky the navigation during the dry season. The Urubamba catchment higher altitudes are famous because of the presence of the Machupicchu ancient city, downslope this city is characterized by the Amazon rainforest with scarce observation stations for water level and rainfall. A very challenging modelling and operational hydrology enterprise was developed. The system implemented for the Urubamba river consist on running the atmospheric part of the global climate model CCM3, this model inputs Sea Surface Temperature forecasts from NCEP-NOAA. The global model was set on a T42 (300 km) grid resolution, this information was used as initial and boundary conditions for the regional model RAMS which provided a downscaled 20 Km grid resolution having as results daily precipitation forecasts. Besides the global

  8. Integrated forecast system atmospheric-hydrologic-hydraulic for the Urubamba River Basin

    Energy Technology Data Exchange (ETDEWEB)

    Metzger, L; Carrillo, M; Diaz, A; Coronado, J; Fano, G [Peruvian National Weather Service, Lima (Peru)

    2006-02-15

    Full text: During the months of December to March, Peru is affected by intense precipitations which generate every year land slides and floods mainly in low and middle river basins of the western and Eastern of the Andes, places that exhibit the greatest number of population and productive activities. These extreme events are favored by the steep slopes that characterize the Peruvian topography. For this reason at the end of year 2000, SENAMHI began the design of a monitoring, analysis and forecast system, that had the capacity to predict the occurrence of adverse events on the low and middle river basins of the main rivers such as Piura river in the north of Peru and the Rimac river in the capital of the country. The success of this system opened the possibilities of developing similar systems throughout the country and extend to different users or sectors such as: energy, water management, river transport, etc. An example of a solution prepared for a user (the gas extraction company Pluspetrol) was the implementation of a river level forecasting system in the Urubamba river to support river navigation in this amazonic river where water level variability turns risky the navigation during the dry season. The Urubamba catchment higher altitudes are famous because of the presence of the Machupicchu ancient city, downslope this city is characterized by the Amazon rainforest with scarce observation stations for water level and rainfall. A very challenging modelling and operational hydrology enterprise was developed. The system implemented for the Urubamba river consist on running the atmospheric part of the global climate model CCM3, this model inputs Sea Surface Temperature forecasts from NCEP-NOAA. The global model was set on a T42 (300 km) grid resolution, this information was used as initial and boundary conditions for the regional model RAMS which provided a downscaled 20 Km grid resolution having as results daily precipitation forecasts. Besides the global

  9. Optimizing Multireservoir System Operating Policies Using Exogenous Hydrologic Variables

    Science.gov (United States)

    Pina, Jasson; Tilmant, Amaury; Côté, Pascal

    2017-11-01

    Stochastic dual dynamic programming (SDDP) is one of the few available algorithms to optimize the operating policies of large-scale hydropower systems. This paper presents a variant, called SDDPX, in which exogenous hydrologic variables, such as snow water equivalent and/or sea surface temperature, are included in the state space vector together with the traditional (endogenous) variables, i.e., past inflows. A reoptimization procedure is also proposed in which SDDPX-derived benefit-to-go functions are employed within a simulation carried out over the historical record of both the endogenous and exogenous hydrologic variables. In SDDPX, release policies are now a function of storages, past inflows, and relevant exogenous variables that potentially capture more complex hydrological processes than those found in traditional SDDP formulations. To illustrate the potential gain associated with the use of exogenous variables when operating a multireservoir system, the 3,137 MW hydropower system of Rio Tinto (RT) located in the Saguenay-Lac-St-Jean River Basin in Quebec (Canada) is used as a case study. The performance of the system is assessed for various combinations of hydrologic state variables, ranging from the simple lag-one autoregressive model to more complex formulations involving past inflows, snow water equivalent, and winter precipitation.

  10. Advanced Autonomous Systems for Space Operations

    Science.gov (United States)

    Gross, A. R.; Smith, B. D.; Muscettola, N.; Barrett, A.; Mjolssness, E.; Clancy, D. J.

    2002-01-01

    New missions of exploration and space operations will require unprecedented levels of autonomy to successfully accomplish their objectives. Inherently high levels of complexity, cost, and communication distances will preclude the degree of human involvement common to current and previous space flight missions. With exponentially increasing capabilities of computer hardware and software, including networks and communication systems, a new balance of work is being developed between humans and machines. This new balance holds the promise of not only meeting the greatly increased space exploration requirements, but simultaneously dramatically reducing the design, development, test, and operating costs. New information technologies, which take advantage of knowledge-based software, model-based reasoning, and high performance computer systems, will enable the development of a new generation of design and development tools, schedulers, and vehicle and system health management capabilities. Such tools will provide a degree of machine intelligence and associated autonomy that has previously been unavailable. These capabilities are critical to the future of advanced space operations, since the science and operational requirements specified by such missions, as well as the budgetary constraints will limit the current practice of monitoring and controlling missions by a standing army of ground-based controllers. System autonomy capabilities have made great strides in recent years, for both ground and space flight applications. Autonomous systems have flown on advanced spacecraft, providing new levels of spacecraft capability and mission safety. Such on-board systems operate by utilizing model-based reasoning that provides the capability to work from high-level mission goals, while deriving the detailed system commands internally, rather than having to have such commands transmitted from Earth. This enables missions of such complexity and communication` distances as are not

  11. Reproducibility of neuroimaging analyses across operating systems.

    Science.gov (United States)

    Glatard, Tristan; Lewis, Lindsay B; Ferreira da Silva, Rafael; Adalat, Reza; Beck, Natacha; Lepage, Claude; Rioux, Pierre; Rousseau, Marc-Etienne; Sherif, Tarek; Deelman, Ewa; Khalili-Mahani, Najmeh; Evans, Alan C

    2015-01-01

    Neuroimaging pipelines are known to generate different results depending on the computing platform where they are compiled and executed. We quantify these differences for brain tissue classification, fMRI analysis, and cortical thickness (CT) extraction, using three of the main neuroimaging packages (FSL, Freesurfer and CIVET) and different versions of GNU/Linux. We also identify some causes of these differences using library and system call interception. We find that these packages use mathematical functions based on single-precision floating-point arithmetic whose implementations in operating systems continue to evolve. While these differences have little or no impact on simple analysis pipelines such as brain extraction and cortical tissue classification, their accumulation creates important differences in longer pipelines such as subcortical tissue classification, fMRI analysis, and cortical thickness extraction. With FSL, most Dice coefficients between subcortical classifications obtained on different operating systems remain above 0.9, but values as low as 0.59 are observed. Independent component analyses (ICA) of fMRI data differ between operating systems in one third of the tested subjects, due to differences in motion correction. With Freesurfer and CIVET, in some brain regions we find an effect of build or operating system on cortical thickness. A first step to correct these reproducibility issues would be to use more precise representations of floating-point numbers in the critical sections of the pipelines. The numerical stability of pipelines should also be reviewed.

  12. Distributed snow modeling suitable for use with operational data for the American River watershed.

    Science.gov (United States)

    Shamir, E.; Georgakakos, K. P.

    2004-12-01

    The mountainous terrain of the American River watershed (~4300 km2) at the Western slope of the Northern Sierra Nevada is subject to significant variability in the atmospheric forcing that controls the snow accumulation and ablations processes (i.e., precipitation, surface temperature, and radiation). For a hydrologic model that attempts to predict both short- and long-term streamflow discharges, a plausible description of the seasonal and intermittent winter snow pack accumulation and ablation is crucial. At present the NWS-CNRFC operational snow model is implemented in a semi distributed manner (modeling unit of about 100-1000 km2) and therefore lump distinct spatial variability of snow processes. In this study we attempt to account for the precipitation, temperature, and radiation spatial variability by constructing a distributed snow accumulation and melting model suitable for use with commonly available sparse data. An adaptation of the NWS-Snow17 energy and mass balance that is used operationally at the NWS River Forecast Centers is implemented at 1 km2 grid cells with distributed input and model parameters. The input to the model (i.e., precipitation and surface temperature) is interpolated from observed point data. The surface temperature was interpolated over the basin based on adiabatic lapse rates using topographic information whereas the precipitation was interpolated based on maps of climatic mean annual rainfall distribution acquired from PRISM. The model parameters that control the melting rate due to radiation were interpolated based on aspect. The study was conducted for the entire American basin for the snow seasons of 1999-2000. Validation of the Snow Water Equivalent (SWE) prediction is done by comparing to observation from 12 snow Sensors. The Snow Cover Area (SCA) prediction was evaluated by comparing to remotely sensed 500m daily snow cover derived from MODIS. The results that the distribution of snow over the area is well captured and the

  13. OPERATIONS REVIEW OF THE SAVANNAH RIVER SITE INTEGRATED SALT DISPOSITION PROCESS - 11327

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T.; Poirier, M.; Fondeur, F.; Fink, S.; Brown, S.; Geeting, M.

    2011-02-07

    The Savannah River Site (SRS) is removing liquid radioactive waste from its Tank Farm. To treat waste streams that are low in Cs-137, Sr-90, and actinides, SRS developed the Actinide Removal Process and implemented the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). The Actinide Removal Process contacts salt solution with monosodium titanate to sorb strontium and select actinides. After monosodium titanate contact, the resulting slurry is filtered to remove the monosodium titanate (and sorbed strontium and actinides) and entrained sludge. The filtrate is transferred to the MCU for further treatment to remove cesium. The solid particulates removed by the filter are concentrated to {approx} 5 wt %, washed to reduce the sodium concentration, and transferred to the Defense Waste Processing Facility for vitrification. The CSSX process extracts the cesium from the radioactive waste using a customized solvent to produce a Decontaminated Salt Solution (DSS), and strips and concentrates the cesium from the solvent with dilute nitric acid. The DSS is incorporated in grout while the strip acid solution is transferred to the Defense Waste Processing Facility for vitrification. The facilities began radiological processing in April 2008 and started processing of the third campaign ('MarcoBatch 3') of waste in June 2010. Campaigns to date have processed {approx}1.2 million gallons of dissolved saltcake. Savannah River National Laboratory (SRNL) personnel performed tests using actual radioactive samples for each waste batch prior to processing. Testing included monosodium titanate sorption of strontium and actinides followed by CSSX batch contact tests to verify expected cesium mass transfer. This paper describes the tests conducted and compares results from facility operations. The results include strontium, plutonium, and cesium removal, cesium concentration, and organic entrainment and recovery data. Additionally, the poster describes lessons learned during

  14. An automated system to simulate the River discharge in Kyushu Island using the H08 model

    Science.gov (United States)

    Maji, A.; Jeon, J.; Seto, S.

    2015-12-01

    Kyushu Island is located in southwestern part of Japan, and it is often affected by typhoons and a Baiu front. There have been severe water-related disasters recorded in Kyushu Island. On the other hand, because of high population density and for crop growth, water resource is an important issue of Kyushu Island.The simulation of river discharge is important for water resource management and early warning of water-related disasters. This study attempts to apply H08 model to simulate river discharge in Kyushu Island. Geospatial meteorological and topographical data were obtained from Japanese Ministry of Land, Infrastructure, Transport and Tourism (MLIT) and Automated Meteorological Data Acquisition System (AMeDAS) of Japan Meteorological Agency (JMA). The number of the observation stations of AMeDAS is limited and is not quite satisfactory for the application of water resources models in Kyushu. It is necessary to spatially interpolate the point data to produce grid dataset. Meteorological grid dataset is produced by considering elevation dependence. Solar radiation is estimated from hourly sunshine duration by a conventional formula. We successfully improved the accuracy of interpolated data just by considering elevation dependence and found out that the bias is related to geographical location. The rain/snow classification is done by H08 model and is validated by comparing estimated and observed snow rate. The estimates tend to be larger than the corresponding observed values. A system to automatically produce daily meteorological grid dataset is being constructed.The geospatial river network data were produced by ArcGIS and they were utilized in the H08 model to simulate the river discharge. Firstly, this research is to compare simulated and measured specific discharge, which is the ratio of discharge to watershed area. Significant error between simulated and measured data were seen in some rivers. Secondly, the outputs by the coupled model including crop growth

  15. Operator support systems activities at EPRI

    International Nuclear Information System (INIS)

    Naser, J.A.

    1993-01-01

    The integration of operator support systems supports the nuclear power plant goals of improved availability and reliability, enhanced safety, reduced operations and maintenance costs, and improved productivity. Two major aspects which supports this integration are discussed in this paper. The first is the plant communications and computing architecture which provides the infrastructure that allows the integration to exist in a easy to implement manner. Open systems concepts are utilized to guarantee interoperability of systems and interchangeability of equipment. The second is the EPRI Plant-Window System which supplies the interface between the human and the plant systems. It implements common human-machine interfaces amongst systems and supports the implementation of diagnostic and decision aids. Work in both of these areas is being done as part of the EPRI Instrumentation and Control Upgrade Program. A number of operator support systems have been developed and are in various stages of implementation, testing and utilization. Two of these, the RWCU and the EOPTS, are described here. 5 refs, 14 figs

  16. Development of a hydro kinetic river turbine with simulation and operational measurement results in comparison

    International Nuclear Information System (INIS)

    Ruopp, A; Ruprecht, A; Riedelbauch, S; Arnaud, G; Hamad, I

    2014-01-01

    The development of a hydro-kinetic prototype was shown including the compound structure, guide vanes, runner blades and a draft tube section with a steeply sloping, short spoiler. The design process of the hydrodynamic layout was split into three major steps. First the compound and the draft tube section was designed and the best operating point was identified using porous media as replacement for the guide vane and runner section (step one). The best operating point and the volume flux as well as the pressure drop was identified and used for the design of the guide vane section and the runner section. Both were designed and simulated independently (step two). In step three, all parts were merged in stationary simulation runs detecting peak power and operational bandwidth. In addition, the full scale demonstrator was installed in August 2010 and measured in the St. Lawrence River in Quebec supporting the average inflow velocity using ADCP (Acoustic Doppler Current Profiler) and the generator power output over the variable rotational speed. Simulation data and measurements are in good agreement. Thus, the presented approach is a suitable way in designing a hydro kinetic turbine

  17. Reliability of operating WWER monitoring systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.A.; Goldrin, V.M.; Garagulya, A.V.

    1996-01-01

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs

  18. Operational expert system applications in Canada

    CERN Document Server

    Suen, Ching Y

    1992-01-01

    This book is part of a new series on operational expert systems worldwide. Expert systems are now widely used in different parts of the world for various applications. The past four years have witnessed a steady growth in the development and deployment of expert systems in Canada. Research in this field has also gained considerable momentum during the past few years. However, the field of expert systems is still young in Canada. This book contains 13 chapters contributed by 31 experts from both universities and industries across Canada covering a wide range of applications related to electric

  19. Reliability of operating WWER monitoring systems

    Energy Technology Data Exchange (ETDEWEB)

    Yastrebenetsky, M A; Goldrin, V M; Garagulya, A V [Ukrainian State Scientific Technical Center of Nuclear and Radiation Safety, Kharkov (Ukraine). Instrumentation and Control Systems Dept.

    1997-12-31

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs.

  20. A Computuerized Operator Support System Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lew, Roger [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ulrich, Tom [Idaho National Lab. (INL), Idaho Falls, ID (United States); Villim, Richard [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-11-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based