WorldWideScience

Sample records for river corridor project

  1. River Corridor Project Workplace Air Monitoring Technical Basis

    International Nuclear Information System (INIS)

    MANTOOTH, D.S.

    2001-01-01

    This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization

  2. River Corridor Easements

    Data.gov (United States)

    Vermont Center for Geographic Information — A River Corridor Easement (RCE) is an area of conserved land adjacent to a river or stream that was conserved to permanently protect the lateral area the river needs...

  3. River Corridors (Jan 2, 2015)

    Data.gov (United States)

    Vermont Center for Geographic Information — River corridors are delineated to provide for the least erosive meandering and floodplain geometry toward which a river will evolve over time. River corridor maps...

  4. HANFORD SITE RIVER CORRIDOR CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.

    2006-01-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km 2 Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal

  5. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    Energy Technology Data Exchange (ETDEWEB)

    Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River

  6. RIVER CORRIDOR BUILDINGS 324 and 327 CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.; SMITH, B.A.

    2006-01-01

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D and D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km 2 (1 mi 2 )300 Area comprises only a small part of the 1517 km 2 (586 mi 2 ) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D and D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Project for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building

  7. Site Outcomes Baseline Multi Year Work Plan Volume 1, River Corridor Restoration Baseline

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The River Corridor Restoration volume is a compilation of Hanford Site scope, which excludes the approximately 194 km 2 Central Plateau. The River Corridor scope is currently contractually assigned to Fluor Hanford, Bechtel Hanford, inc., DynCorp, and Pacific Northwest National Laboratory, and others. The purpose of this project specification is to provide an overall scoping document for the River Corridor Restoration volume, and to provide a link with the overall Hanford Site River Corridor scope. Additionally, this specification provides an integrated and consolidated source of information for the various scopes, by current contract, for the River Corridor Restoration Baseline. It identifies the vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards

  8. Nitrogen retention in river corridors: European perspective

    Energy Technology Data Exchange (ETDEWEB)

    Haycock, N [Dept. of Agriculture and Water Management, Silsoe College, Cranfield Institute of Technology (United Kingdom); Pinay, G [CERR/CNRS, Toulouse (France); Walker, Charles [SBEG, Inst. of Ecology, Lund Univ. (Sweden)

    1993-01-01

    The problem of nitrogen pollution in European surface- and groundwaters has become a focus of recent European and Scandinavian directives, with legislation calling for a 50% reduction of N losses by the years 1995 and 2000, respectively. This paper provides a conceptual framework upon which management strategies to reduce losses of diffuse nitrogen pollution to surface waters may be based. The control of nitrogen pollution may take place through an increase in the complexity of the landscape, not throughout the catchment area, but rather in specific zones, the river corridor in particular. Within river corridors, riparian areas have been recognized globally for their value as nutrient removal ''buffer systems''. Studies have identified vegetation uptake and microbial denitrification as the primary mechanisms responsible for N removal in these systems. For these processes to function optimally on an annual basis, both vegetation and water regime must be managed. The establishment and management of riparian buffer zones in suitable places within river corridors, will provide a stable and sustainable water-protection function. This will complement future nitrogen input control strategies, needed for both the long-term protection of groundwater and surface waters in Europe as a whole, and for the proposed 50% reduction in nitrogen loading to the Baltic and North Sea coastal waters by the turn of the century. 52 refs, 5 figs

  9. 2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    West, W. J.; Lucas, J. G.; Gano, K. A.

    2011-11-14

    This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

  10. 2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    C. T. Lindsey, A. L. Johnson

    2010-09-30

    This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

  11. Variable input parameter influence on river corridor prediction

    NARCIS (Netherlands)

    Zerfu, T.; Beevers, L.; Crosato, A.; Wright, N.

    2015-01-01

    This paper considers the erodible river corridor, which is the area in which the main river channel is free to migrate over a period of time. Due to growing anthropogenic pressure, predicting the corridor width has become increasingly important for the planning of development along rivers. Several

  12. River-corridor habitat dynamics, Lower Missouri River

    Science.gov (United States)

    Jacobson, Robert B.

    2010-01-01

    Intensive management of the Missouri River for navigation, flood control, and power generation has resulted in substantial physical changes to the river corridor. Historically, the Missouri River was characterized by a shifting, multithread channel and abundant unvegetated sandbars. The shifting channel provided a wide variety of hydraulic environments and large areas of connected and unconnected off-channel water bodies.Beginning in the early 1800s and continuing to the present, the channel of the Lower Missouri River (downstream from Sioux City, Iowa) has been trained into a fast, deep, single-thread channel to stabilize banks and maintain commercial navigation. Wing dikes now concentrate the flow, and revetments and levees keep the channel in place and disconnect it from the flood plain. In addition, reservoir regulation of the Missouri River upstream of Yankton, South Dakota, has substantially changed the annual hydrograph, sediment loads, temperature regime, and nutrient budgets.While changes to the Missouri River have resulted in broad social and economic benefits, they have also been associated with loss of river-corridor habitats and diminished populations of native fish and wildlife species. Today, Missouri River stakeholders are seeking ways to restore some natural ecosystem benefits of the Lower Missouri River without compromising traditional economic uses of the river and flood plain.

  13. Wood and Sediment Dynamics in River Corridors

    Science.gov (United States)

    Wohl, E.; Scott, D.

    2015-12-01

    Large wood along rivers influences entrainment, transport, and storage of mineral sediment and particulate organic matter. We review how wood alters sediment dynamics and explore patterns among volumes of instream wood, sediment storage, and residual pools for dispersed pieces of wood, logjams, and beaver dams. We hypothesized that: volume of sediment per unit area of channel stored in association with wood is inversely proportional to drainage area; the form of sediment storage changes downstream; sediment storage correlates most strongly with wood load; and volume of sediment stored behind beaver dams correlates with pond area. Lack of data from larger drainage areas limits tests of these hypotheses, but analyses suggest a negative correlation between sediment volume and drainage area and a positive correlation between wood and sediment volume. The form of sediment storage in relation to wood changes downstream, with wedges of sediment upstream from jammed steps most prevalent in small, steep channels and more dispersed sediment storage in lower gradient channels. Use of a published relation between sediment volume, channel width, and gradient predicted about half of the variation in sediment stored upstream from jammed steps. Sediment volume correlates well with beaver pond area. Historically more abundant instream wood and beaver populations likely equated to greater sediment storage within river corridors. This review of the existing literature on wood and sediment dynamics highlights the lack of studies on larger rivers.

  14. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  15. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  16. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  17. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  18. Detecting dispersal of Nuphar lutea in river corridors using microsatellite markers

    Czech Academy of Sciences Publication Activity Database

    Fér, T.; Hroudová, Zdenka

    2008-01-01

    Roč. 53, č. 7 (2008), s. 1409-1422 ISSN 0046-5070 R&D Projects: GA AV ČR(CZ) KJB6111304 Institutional research plan: CEZ:AV0Z60050516 Keywords : Nuphar lutea * dispersal * river corridors Subject RIV: EF - Botanics Impact factor: 2.704, year: 2008

  19. Landuse Types within Channel Corridor and River Channel Morphology of River Ona, Ibadan, Nigeria

    Directory of Open Access Journals (Sweden)

    Olutoyin Fashae

    2017-12-01

    Full Text Available The importance of river a corridor warrants a well thought out and balanced management approach because it helps in improving or maintaining water quality, protecting wetlands, etc. Hence, this study seeks to identify major landuse types within the River Ona Corridor; examine the impact of these landuse types within the River Ona corridor on its channel morphology and understand the risk being posed by these landuse types. The study is designed by selecting two reaches of six times the average width from each of the four major landuse types that exist along the river corridor. This study revealed that along the downstream section of Eleyele Dam of River Ona, natural forest stabilizes river channel banks, thereby presenting a narrow and shallow width and depth respectively but the widest of all is found at the agricultural zones.

  20. Requirements Definition for ORNL Trusted Corridors Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Hill, David E [ORNL; Smith, Cyrus M [ORNL; DeNap, Frank A [ORNL; White, James D [ORNL; Gross, Ian G [ORNL; Gorman, Bryan L [ORNL; Hively, Lee M [ORNL; Abercrombie, Robert K [ORNL

    2008-02-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and

  1. Requirements Definition for ORNL Trusted Corridors Project

    International Nuclear Information System (INIS)

    Walker, Randy M; Hill, David E; Smith, Cyrus M; DeNap, Frank A; White, James D; Gross, Ian G; Gorman, Bryan L; Hively, Lee M; Abercrombie, Robert K

    2008-01-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and

  2. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  3. 76 FR 56471 - Meeting of the John H. Chafee Blackstone River Valley National Heritage Corridor Commission

    Science.gov (United States)

    2011-09-13

    ...] Meeting of the John H. Chafee Blackstone River Valley National Heritage Corridor Commission AGENCY: National Heritage Corridor Commission, John H. Chafee Blackstone River Valley, National Park Service... Advisory Committee Act, 5 U.S.C. Appendix, that the John H. Chafee Blackstone River Valley National...

  4. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    International Nuclear Information System (INIS)

    Walker, Randy M.; Gross, Ian G.; Smith, Cyrus M.; Hill, David E.

    2011-01-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  5. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to

  6. Dynamic network expansion, contraction, and connectivity in the river corridor of mountain stream network

    Science.gov (United States)

    Ward, A. S.; Schmadel, N.; Wondzell, S. M.

    2017-12-01

    River networks are broadly recognized to expand and contract in response to hydrologic forcing. Additionally, the individual controls on river corridor dynamics of hydrologic forcing and geologic setting are well recognized. However, we currently lack tools to integrate our understanding of process dynamics in the river corridor and make predictions at the scale of river networks. In this study, we develop a perceptual model of the river corridor in mountain river networks, translate this into a reduced-complexity mechanistic model, and implement the model in a well-studied headwater catchment. We found that the river network was most sensitive to hydrologic dynamics under the lowest discharges (Qgauge managers of water resources who need to estimate connectivity and flow initiation location along the river corridor over broad, unstudied catchments.

  7. A Continental-scale River Corridor Model to Synthesize Understanding and Prioritize Management of Water Purification Functions and Ecological Services in Large Basins

    Science.gov (United States)

    Harvey, J. W.; Gomez-Velez, J. D.; Scott, D.; Boyer, E. W.; Schmadel, N. M.; Alexander, R. B.; Eng, K.; Golden, H. E.; Kettner, A.; Konrad, C. P.; Moore, R. B.; Pizzuto, J. E.; Schwarz, G. E.; Soulsby, C.

    2017-12-01

    processing in river networks of the Mid-Atlantic and Northeastern U.S. This research is a product of the John Wesley Powell Center River Corridor Working Group https://powellcenter.usgs.gov/view-project

  8. Influences of Coupled Hydrologic and Microbial Processes on River Corridor Biogeochemistry and Ecology

    Science.gov (United States)

    Scheibe, T. D.; Song, H. S.; Stegen, J.; Graham, E.; Bao, J.; Goldman, A.; Zhou, T.; Crump, A.; Hou, Z.; Hammond, G. E.; Chen, X.; Huang, M.; Zhang, X.; Nelson, W. C.; Garayburu-Caruso, V. A.

    2017-12-01

    The exchange of water between rivers and surrounding subsurface environments (hydrologic exchange flows or HEFs) is a vital aspect of river ecology and watershed function. HEFs play a key role in water quality, nutrient cycling, and ecosystem health, and they modulate water temperatures and enhance exchange of terrestrial and aquatic nutrients, which lead to elevated biogeochemical activity. However, these coupled hydrologic and microbiological processes are not well understood, particularly in the context of large managed river systems with highly variable discharge, and are poorly represented in system-scale quantitative models. Using the 75 km Hanford Reach of the Columbia River as the research domain, we apply high-resolution flow simulations supported by field observations to understand how variable river discharge interacts with hydromorphic and hydrogeologic structures to generate HEFs and distributions of subsurface residence times. We combine this understanding of hydrologic processes with microbiological activity measurements and reactive transport models to elucidate the holistic impacts of variable discharge on river corridor (surface and subsurface) ecosystems. In particular, our project seeks to develop and test new conceptual and numerical models that explicitly incorporate i) the character (chemical speciation and thermodynamics) of natural organic matter as it varies along flow paths and through mixing of groundwater and surface water, and ii) the history-dependent response of microbial communities to varying time scales of inundation associated with fluctuations in river discharge. The results of these high-resolution mechanistic models are guiding formulation and parameterization of reduced-order models applicable at reach to watershed scales. New understanding of coupled hydrology and microbiology in the river corridor will play a key role in reduction of uncertainties associated with major Earth system biogeochemical fluxes, improving

  9. Grizzly bears and calving caribou: What is the relation with river corridors?

    Science.gov (United States)

    Young, Donald D.; McCabe, Thomas R.

    1998-01-01

    Researchers have debated the effect of the Trans-Alaska Pipeline (TAP) and associated developments to caribou (Rangifer tarandus) of the central Arctic herd (CAH) since the 1970s. Several studies have demonstrated that cows and calves of the CAH avoided the TAP corridor because of disturbance associated with the pipeline, whereas others have indicated that female caribou of the CAH avoided riparian habitats closely associated with the pipeline. This avoidance was explained as a predator-avoidance strategy. We investigated the relation between female caribou and grizzly bear (Ursus arctos) use of river corridors on the yet undisturbed calving grounds of the Porcupine caribou herd (PCH) in northeastern Alaska. On the coastal plain, caribou were closer to river corridors than expected (P = 0.038), but bear use of river corridors did not differ from expected (P = 0.740). In the foothills, caribou use of river corridors did not differ from expected (P = 0.520), but bears were farther from rivers than expected (P = 0.001). Our results did not suggest an avoidance of river corridors by calving caribou or a propensity for bears to be associated with riparian habitats, presumably for stalking or ambush cover. We propose that PCH caribou reduce the risks of predation to neonates by migrating to a common calving grounds, where predator swamping is the operational antipredator strategy. Consequently, we hypothesize that nutritional demands, not predator avoidance strategies, ultimately regulate habitat use patterns (e.g., use of river corridors) of calving PCH caribou.

  10. Slovenian and European legal stipulations concerning protection and rehabilitation of river corridors

    Directory of Open Access Journals (Sweden)

    Matjaž Mikoš

    2003-01-01

    Full Text Available In view of the state of hydromorphological preservation of river corridors in the Slovenian hydrographic network and because of demands imposed by domestic and European legislature concerning water resource management and environmental protection, certain sections of rivers and streams that were for various reasons regulated in the past, will have to be rehabilitated. Permanent solutions to such issues demand careful planning of rehabilitation on suitable sections of rivers and streams, adequate positioning within physical planning acts, as well as streamlined administrative procedures and devised maintenance of rehabilitation areas. Because the process demands the return of formerly taken water surfaces into the domain of water ecosystems and dynamics of hydromorphological processes, and consequentially maintenance of regained surfaces, the public becomes an important factor, which is a position, granted by domestic and European laws. Last, but not least, successful execution of rehabilitation of water corridors, besides planning, administration and consistent public participation, demands knowledge about good practices of project management, as well as technical execution of such projects.

  11. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  12. River networks as ecological corridors: A coherent ecohydrological perspective

    Science.gov (United States)

    Rinaldo, Andrea; Gatto, Marino; Rodriguez-Iturbe, Ignacio

    2018-02-01

    This paper draws together several lines of argument to suggest that an ecohydrological framework, i.e. laboratory, field and theoretical approaches focused on hydrologic controls on biota, has contributed substantially to our understanding of the function of river networks as ecological corridors. Such function proves relevant to: the spatial ecology of species; population dynamics and biological invasions; the spread of waterborne disease. As examples, we describe metacommunity predictions of fish diversity patterns in the Mississippi-Missouri basin, geomorphic controls imposed by the fluvial landscape on elevational gradients of species' richness, the zebra mussel invasion of the same Mississippi-Missouri river system, and the spread of proliferative kidney disease in salmonid fish. We conclude that spatial descriptions of ecological processes in the fluvial landscape, constrained by their specific hydrologic and ecological dynamics and by the ecosystem matrix for interactions, i.e. the directional dispersal embedded in fluvial and host/pathogen mobility networks, have already produced a remarkably broad range of significant results. Notable scientific and practical perspectives are thus open, in the authors' view, to future developments in ecohydrologic research.

  13. 75 FR 48359 - Blackstone River Valley National Heritage Corridor Commission: Notice of Meeting

    Science.gov (United States)

    2010-08-10

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Blackstone River Valley National Heritage..., United States Code, that a meeting of the John H. Chafee Blackstone River Valley National Heritage..., Blackstone River Valley National Heritage Corridor Commission, One Depot Square, Woonsocket, RI 02895, Tel...

  14. Experimental Salix shoot and root growth statistics on the alluvial sediment of a restored river corridor

    Science.gov (United States)

    Pasquale, N.; Perona, P.; Verones, F.; Francis, R.; Burlando, P.

    2009-12-01

    River restoration projects encompass not only the amelioration of flood protection but also the rehabilitation of the riverine ecosystem. However, the interactions and feedbacks between river hydrology, riparian vegetation and aquifer dynamics are still poorly understood. Vegetation interacts with river hydrology on multiple time scales. Hence, there is considerable interest in understanding the morphodynamics of restored river reaches in relation to the characteristics of vegetation that may colonize the bare sediment, and locally stabilize it by root anchoring. In this paper we document results from a number of ongoing experiments within the project RECORD (Restored CORridor Dynamics, sponsored by CCES - www.cces.ch - and Cantons Zurich and Thurgau, CH). In particular, we discuss both the above and below ground biomass growth dynamics of 1188 Salix cuttings (individual and group survival rate, growth of the longest shoots and number of branches and morphological root analysis) in relation to local river hydrodynamics. Cuttings were organized in square plots of different size and planted in spring 2009 on a gravel island of the restored river section of River Thur in Switzerland. By periodical monitoring the plots we obtained a detailed and quite unique set of data, including root statistics of uprooted samples derived from image analysis from a high-resolution scanner. Beyond describing the survival rate dynamics in relation to river hydrology, we show the nature and strength of correlations between island topography and cutting growth statistics. In particular, by root analysis and by comparing empirical histograms of the vertical root distribution vs satured water surface in the sediment, we show that main tropic responses on such environment are oxytropism, hydrotropism and thigmotropism. The main factor influencing the survival rate is naturally found in erosion by floods, of which we also give an interesting example that helps demonstrate the role of river

  15. Value and Resilience in the Case of 'Invasive' Tamarix in the Colorado River Riparian Corridor

    Science.gov (United States)

    Loring, P. A.; Gerlach, S.; Zamora, F.

    2009-12-01

    A common premise of science for conservation and sustainability is an assumption that despite any human definitions of value, there are ecological first principles, e.g., resilience, which must be understood if sustainability is to be possible. As I show here, however, pursuits such as restoration, conservation, and sustainability remain tangled in (and sometimes at odds with one another regarding) many value-laden decisions regarding the equity, justice, and morality of human-environment interactions. These include such important decisions as: what should be restored or sustained and for whom, how and by whom, and at what cost. This paper uses examples from the lower Colorado River Riparian Corridor, in particular the issue of the so-called ‘invasive’ saltcedar (Tamarix spp.), to illustrate some of the implicit value judgments common to the practice of managing ecosystems. There are many possible perspectives to be taken on a matter like Tamarix, each implicitly or explicitly representing different worldviews and agendas for the ecosystems in question. Resilience theory provides one such perspective, but as I show here, it proves incapable of producing recommendations for managing the corridor that are free of subjective valuations. I end with a case study of habitat and Tamarix management practices in the Mexican portion of the Colorado River Delta, highlighting the proven potential when up-front values are explicitly coupled to the practice of sustainability science, rather than left as details for 'good governance,' a realm presently imagined as separate from science, to sort out. Map of the Colorado River Delta. The Sonoran Institute manages projects in the Mexican portion of the Colorado River Delta region, along the Rio Hardy, the mainstem of the Colorado River in Baja California, MX and in the Cienega de Santa Clara wetlands, Sonora, MX. Map courtesy of Water Education Foundation. www.watereducation.org

  16. Seasonal Dynamics of River Corridor Exchange Across the Continental United States

    Science.gov (United States)

    Gomez-Velez, J. D.; Harvey, J. W.; Scott, D.; Boyer, E. W.; Schmadel, N. M.

    2017-12-01

    River corridors store and convey mass and energy from landscapes to the ocean, altering water quality and ecosystem functioning at the local, reach, and watershed scales. As water moves through river corridors from headwaters streams to coastal estuaries, dynamic exchange between the river channel and its adjacent riparian, floodplain, and hyporheic zones, combined with ponded waters such as lakes and reservoirs, results in the emergence of hot spots and moments for biogeochemical transformations. In this work, we used the model Networks with EXchange and Subsurface Storage (NEXSS) to estimate seasonal variations in river corridor exchange fluxes and residence times along the continental United States. Using a simple routing scheme, we translate these estimates into a cumulative measure of river corridor connectivity at the watershed scale, differentiating the contributions of hyporheic zones, floodplains, and ponded waters. We find that the relative role of these exchange subsystems changes seasonally, driven by the intra-seasonal variability of discharge. In addition, we find that seasonal variations in discharge and the biogeochemical potential of hyporheic zones are out of phase. This behavior results in a significant reduction in hyporheic water quality functions during high flows and emphasizes the potential importance of reconnecting floodplains for managing water quality during seasonal high flows. Physical parameterizations of river corridor processes are critical to model and predict water quality and to sustainably manage water resources under present and future socio-economic and climatic conditions. Parsimonious models like NEXSS can play a key role in the design, implementation, and evaluation of sustainable management practices that target both water quantity and quality at the scale of the nation. This research is a product of the John Wesley Powell Center River Corridor Working Group.

  17. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  18. Arbuscular mycorrhizal fungi associations of vascular plants confined to river valleys: towards understanding the river corridor plant distribution.

    Science.gov (United States)

    Nobis, Agnieszka; Błaszkowski, Janusz; Zubek, Szymon

    2015-01-01

    The group of river corridor plants (RCP) includes vascular plant species which grow mainly or exclusively in the valleys of large rivers. Despite the long recognized fact that some plant species display a corridor-like distribution pattern in Central Europe, there is still no exhaustive explanation of the mechanisms generating this peculiar distribution. The main goal of this study was therefore to investigate whether arbuscular mycorrhizal fungi (AMF) and fungal root endophytes influence the RCP distribution. Arbuscular mycorrhizae (AM) were observed in 19 out of 33 studied RCP. Dark septate endophytes (DSE) and Olpidium spp. were recorded with low abundance in 15 and 10 plant species, respectively. The spores of AMF were found only in 32% of trap cultures established from the soils collected in the river corridor habitats. In total, six widespread AMF species were identified. Because the percentage of non-mycorrhizal species in the group of RCP is significant and the sites in river corridors are characterized by low AMF species diversity, RCP can be outcompeted outside river valleys by the widespread species that are able to benefit from AM associations in more stable plant-AMF communities in non-river habitats.

  19. Modern comprehensive approach to monitor the morphodynamic evolution of a restored river corridor

    Directory of Open Access Journals (Sweden)

    N. Pasquale

    2011-04-01

    Full Text Available River restoration has become a common measure to repair anthropogenically-induced alteration of fluvial ecosystems. The inherent complexity of ecohydrologic systems leads to limitations in understanding the response of such systems to restoration over time. Therefore, a significant effort has been dedicated in the recent years worldwide to document the efficiency of restoration actions and to produce new effective guidelines that may help overcoming existing deficiencies. At the same time little attention was paid to illustrate the reasons and the use of certain monitoring and experimental techniques in spite of others, or in relation to the specific ecohydrologic process being investigated. The purpose of this paper is to enrich efforts in this direction by presenting the framework of experimental activities and the related experimental setup that we designed and installed in order to accomplish some of the research tasks of the multidisciplinary scientific project RECORD (Restored Corridor Dynamics. Therein, we studied the morphodynamic evolution of the restored reach of the River Thur near Niederneunforn (Switzerland, also in relation to the role of pioneer vegetation roots in stabilizing the alluvial sediment. In this work we describe the methodology chosen for monitoring the river morphodynamics, the dynamics of riparian and of in-bed vegetation and their mutual interactions, as well as the need of complementing such observations with experiments and with the hydraulic modeling of the site. We also discuss how the designed installation and the experiments integrate with the needs of other research groups within the project, in particular providing data for a number of investigations thereby including surface water and groundwater interactions, soil moisture and vegetation dynamics.

  20. Out of Africa: the importance of rivers as human migration corridors

    Science.gov (United States)

    Ramirez, J. A.; Coulthard, T. J.; Rogerson, M.; Barton, N.; Bruecher, T.

    2013-12-01

    The route and timing of Homo sapiens exiting Africa remains uncertain. Corridors leading out of Africa through the Sahara, the Nile Valley, and the Red Sea coast have been proposed as migration routes for anatomically modern humans 80,000-130,000 years ago. During this time climate conditions in the Sahara were wetter than present day, and monsoon rainfall fed rivers that flowed across the desert landscape. The location and timing of these rivers may have supported human migration northward from central Africa to the Mediterranean coast, and onwards to Europe or Asia. Here, we use palaeoclimate rainfall and a hydrological model to spatially simulate and quantitatively test the existence of three major rivers crossing the Sahara from south to north during the time of human migration. We provide evidence that, given realistic underlying climatology, the well-known Sahabi and Kufrah rivers very likely flowed across modern day Libya and reached the coast. More unexpectedly an additional river crossed the core of the Sahara through Algeria (Irharhar river) and flowed into the Chotts basin. The Irharhar river is unique, because it links locations in central Africa experiencing monsoon climates with temperate coastal Mediterranean environments where food and resources were likely abundant. From an ecological perspective, this little-known corridor may prove to be the most parsimonious migration route. Support for the Irharar as a viable migration corridor is provided by its geographic proximity to middle Stone Age archaeological artefacts found in North Africa. Our new, highly novel approach provides the first quantitative analysis of the likelihood that rivers occurred during the critical period of human migration out of Africa. Simulated probability of surface water in North Africa during the last interglacial and the location of tools and ornaments from the Middle Stone Age.

  1. Hydrologic Connectivity Estimated throughout the Nation's River Corridors

    Science.gov (United States)

    Harvey, J. W.; Gomez-Velez, J. D.

    2015-12-01

    Hydrologic connectivity is a key concept that integrates longitudinal transport in rivers with vertical and lateral exchanges between rivers and hyporheic zones, riparian wetlands, floodplains, and ponded aquatic ecosystems. Desirable levels of connectivity are thought to be associated with rivers that are well-connected longitudinally while also being well connected vertically and laterally with marginal waters where carbon and nutrients are efficiently transformed, and where aquatic organisms feed, or are reared, or take refuge during floods. But what is the proper balance between longitudinal and vertical and lateral connectivity? We took a step towards quantifying hydrologic connectivity using the model NEXSS (Gomez-Velez and Harvey, 2014, GRL) applied throughout the nation's rivers. NEXSS simulates vertical and lateral connectivity and compares it with longitudinal transport along the river's main axis. It uses as inputs measured network topology for first to eighth order channels, river hydraulic geometry, sediment grain size, bedform types and sizes, estimated hydraulic conductivity of sediments, and estimates of reaction rates such as denitrification. Results indicate that hyporheic flow is large enough to exchange a river's entire volume many times within a river network, which increases biogeochemical opportunities for nutrient processing and attenuation of contaminants. Also, the analysis demonstrated why and where (i.e., in which physiographic regions of the nation) are hyporheic flow and solute reactions the greatest. The cumulative influence of hydrologic connectivity on water quality is expressed by a dimensionless index of reaction significance. Our quantification of hydrologic connectivity adds a physical basis that supports water quality modeling, and also supports scientifically based prioritization of management actions (e.g. stream restoration) and may support other types of actions (e.g. legislative actions) to help conserve healthy functional

  2. 2009 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    C. T. Lindsey; K. A. Gano; R. D. Teel

    2009-09-30

    This document details the results of revegetation and mitigation monitoring conducted in 2009, including 25 revegetation/restoration projects, one revegetation/mitigation project, and three bat mitigation projects.

  3. Towards improved instrumentation for assessing river-groundwater interactions in a restored river corridor

    Directory of Open Access Journals (Sweden)

    P. Schneider

    2011-08-01

    Full Text Available River restoration projects have been launched over the last two decades to improve the ecological status and water quality of regulated rivers. As most restored rivers are not monitored at all, it is difficult to predict consequences of restoration projects or analyze why restorations fail or are successful. It is thus necessary to implement efficient field assessment strategies, for example by employing sensor networks that continuously measure physical parameters at high spatial and temporal resolution. This paper focuses on the design and implementation of an instrumentation strategy for monitoring changes in bank filtration, hydrological connectivity, groundwater travel time and quality due to river restoration. We specifically designed and instrumented a network of monitoring wells at the Thur River (NE Switzerland, which is partly restored and has been mainly channelized for more than 100 years. Our results show that bank filtration – especially in a restored section with alternating riverbed morphology – is variable in time and space. Consequently, our monitoring network has been adapted in response to that variability. Although not available at our test site, we consider long-term measurements – ideally initiated before and continued after restoration – as a fundamental step towards predicting consequences of river restoration for groundwater quality. As a result, process-based models could be adapted and evaluated using these types of high-resolution data sets.

  4. 2008 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    C. T. Lindsey; K. A. Gano

    2008-09-30

    The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2008 and includes 22 revegetation/restoration projects, one revegetation/mitigation project, and two bat habitat mitigation projects.

  5. 2007 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    K. A. Gano; C. T. Lindsey

    2007-09-27

    The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2007 and includes 11 revegetation/restoration projects, one revegetation/mitigation project, and 3 bat habitat mitigation projects.

  6. Sapucai River Project

    International Nuclear Information System (INIS)

    Duarte, A.L.; Rosa, M.J.

    1988-01-01

    The Sapucai River Project is a gold, ilmenite, monazite and zircon alluvial deposit. It is located on Sapucai River valley in the south of Minas Gerais State. The reserves are 28.000.000 m 3 of pay bed. The production will be 1.400.000 m 3 /year and the mine's life 20 years. A cutterhead suction dredge will do the overburden removal. The pay bed will be mined with an underwater bucket-wheel dredge. The ROM will be concentrated in a washing plant. The gold will be recovered by leaching method. The other heavy minerals will be recovered by electrostatic, magnetic and gravitic methods. SAMITRI believes that it's possible to implant and operate the Project without ecological damage. (author) [pt

  7. 2006 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    A. L. Johnson; K. A. Gano

    2006-10-03

    The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. One of the objectives of restoration is the revegetation of remediated waste sites to stabilize the soil and restore the land to native vegetation. The report documents the results of revegetation and mitigation monitoring conducted in 2006 and includes 11 revegetation/restoration projects, one revegetation/mitigation project, and 2 bat habitat mitigation projects.

  8. Renewal or rehabilitation of urban river and stream corridors

    Directory of Open Access Journals (Sweden)

    Matjaž Mikoš

    2001-01-01

    Full Text Available Analyses of the morphological state of urban streams and rivers in the Municipality of Ljubljana and research concerning the hydrographical network show that the condition of their morphological preservation is alarming. Efforts put in the new spatial development concept, guidelines and proposals for urban rehabilitation are therefore also an opportunity for rehabilitation measures on the municipal hydrographical network. Adequate care should be given to their improved morphological state even because of the recently adopted European framework water directive (annex 5, that after a certain period demands such a status of surface water in signatory countries.

  9. Hydrologic indicators of hot spots and hot moments of mercury methylation potential along river corridors

    Science.gov (United States)

    Singer, Michael B.; Harrison, Lee R.; Donovan, Patrick M.; Blum, Joel D.; Marvin-DiPasquale, Mark C.

    2016-01-01

    The biogeochemical cycling of metals and other contaminants in river-floodplain corridors is controlled by microbial activity responding to dynamic redox conditions. Riverine flooding thus has the potential to affect speciation of redox-sensitive metals such as mercury (Hg). Therefore, inundation history over a period of decades potentially holds information on past production of bioavailable Hg. We investigate this within a Northern California river system with a legacy of landscape-scale 19th century hydraulic gold mining. We combine hydraulic modeling, Hg measurements in sediment and biota, and first-order calculations of mercury transformation to assess the potential role of river floodplains in producing monomethylmercury (MMHg), a neurotoxin which accumulates in local and migratory food webs. We identify frequently inundated floodplain areas, as well as floodplain areas inundated for long periods. We quantify the probability of MMHg production potential (MPP) associated with hydrology in each sector of the river system as a function of the spatial patterns of overbank inundation and drainage, which affect long-term redox history of contaminated sediments. Our findings identify river floodplains as periodic, temporary, yet potentially important, loci of biogeochemical transformation in which contaminants may undergo change during limited periods of the hydrologic record. We suggest that inundation is an important driver of MPP in river corridors and that the entire flow history must be analyzed retrospectively in terms of inundation magnitude and frequency in order to accurately assess biogeochemical risks, rather than merely highlighting the largest floods or low-flow periods. MMHg bioaccumulation within the aquatic food web in this system may pose a major risk to humans and waterfowl that eat migratory salmonids, which are being encouraged to come up these rivers to spawn. There is a long-term pattern of MPP under the current flow regime that is likely to be

  10. Alligator Rivers analogue project

    International Nuclear Information System (INIS)

    Duerden, P.

    1990-01-01

    Australian Nuclear Science and Technology Organization has extensively evaluated uranium ore bodies in the Alligator Rivers Uranium Province in Australia as analogues of radioactive waste repositories. The work was extended for a three-year program as an international project based on the Koongarra uranium deposit and sponsored by the OECD Nuclear Energy Agency. The technical program comprises six major sub-projects involving modelling and experimental work: modelling of radionuclide migration; hydrogeology of the Koongarra uranium deposit; uranium/thorium series disequilibria studies; groundwater and colloid studies; fission product studies; transuranic nuclide studies; an outline of the technical programs and a summary of progress in the technical sub-projects is given. This is followed by a series of technical reports which briefly describe current research tasks, and which have been separately indexed

  11. Development and Implementation of the Waste Management Information System to Support Hanford's River Corridor Cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Nolan, L M [Washington Closure Hanford, LLC, 3070 George Washington Way, Richland, WA 99354 (United States)

    2006-07-01

    This paper describes the development of a Waste Information Management System (WMIS) to support the waste designation, transportation, and disposal processes used by Washington Closure Hanford, LLC to support cleanup of the Columbia River Corridor. This waste, primarily consisting of remediated burial sites and building demolition debris, is disposed at the Environmental Restoration Disposal Facility (ERDF), which is located in the center of the Hanford Site (an approximately 1460 square kilometers site). WMIS uses a combination of bar-code scanning, hand-held computers, and strategic employment of a radio frequency identification (RFID) tag system to track each waste shipment from waste generation to disposal. (authors)

  12. River corridor science: Hydrologic exchange and ecological consequences from bedforms to basins

    Science.gov (United States)

    Harvey, Judson; Gooseff, Michael

    2015-01-01

    Previously regarded as the passive drains of watersheds, over the past 50 years, rivers have progressively been recognized as being actively connected with off-channel environments. These connections prolong physical storage and enhance reactive processing to alter water chemistry and downstream transport of materials and energy. Here we propose river corridor science as a concept that integrates downstream transport with lateral and vertical exchange across interfaces. Thus, the river corridor, rather than the wetted river channel itself, is an increasingly common unit of study. Main channel exchange with recirculating marginal waters, hyporheic exchange, bank storage, and overbank flow onto floodplains are all included under a broad continuum of interactions known as “hydrologic exchange flows.” Hydrologists, geomorphologists, geochemists, and aquatic and terrestrial ecologists are cooperating in studies that reveal the dynamic interactions among hydrologic exchange flows and consequences for water quality improvement, modulation of river metabolism, habitat provision for vegetation, fish, and wildlife, and other valued ecosystem services. The need for better integration of science and management is keenly felt, from testing effectiveness of stream restoration and riparian buffers all the way to reevaluating the definition of the waters of the United States to clarify the regulatory authority under the Clean Water Act. A major challenge for scientists is linking the small-scale physical drivers with their larger-scale fluvial and geomorphic context and ecological consequences. Although the fine scales of field and laboratory studies are best suited to identifying the fundamental physical and biological processes, that understanding must be successfully linked to cumulative effects at watershed to regional and continental scales.

  13. Quantifying geomorphic controls on riparian forest dynamics using a linked physical-biological model: implications for river corridor conservation

    Science.gov (United States)

    Stella, J. C.; Harper, E. B.; Fremier, A. K.; Hayden, M. K.; Battles, J. J.

    2009-12-01

    In high-order alluvial river systems, physical factors of flooding and channel migration are particularly important drivers of riparian forest dynamics because they regulate habitat creation, resource fluxes of water, nutrients and light that are critical for growth, and mortality from fluvial disturbance. Predicting vegetation composition and dynamics at individual sites in this setting is challenging, both because of the stochastic nature of the flood regime and the spatial variability of flood events. Ecological models that correlate environmental factors with species’ occurrence and abundance (e.g., ’niche models’) often work well in infrequently-disturbed upland habitats, but are less useful in river corridors and other dynamic zones where environmental conditions fluctuate greatly and selection pressures on disturbance-adapted organisms are complex. In an effort to help conserve critical riparian forest habitat along the middle Sacramento River, CA, we are taking a mechanistic approach to quantify linkages between fluvial and biotic processes for Fremont cottonwood (Populus fremontii), a keystone pioneer tree in dryland rivers ecosystems of the U.S. Southwest. To predict the corridor-wide population effects of projected changes to the disturbance regime from flow regulation, climate change, and landscape modifications, we have coupled a physical model of channel meandering with a patch-based population model that incorporates the climatic, hydrologic, and topographic factors critical for tree recruitment and survival. We employed these linked simulations to study the relative influence of the two most critical habitat types--point bars and abandoned channels--in sustaining the corridor-wide cottonwood population over a 175-year period. The physical model uses discharge data and channel planform to predict the spatial distribution of new habitat patches; the population model runs on top of this physical template to track tree colonization and survival on

  14. LJUBLJANICA CONNECTS - Restoration of the Ljubljanica River corridor and improvement of the river's flow regime

    Science.gov (United States)

    Zabret, Katarina; Sapač, Klaudija; Šraj, Mojca; Bezak, Nejc; Sečnik, Matej; Vidmar, Andrej; Brilly, Mitja

    2016-04-01

    The project Ljubljanica connects is focused on improving connectivity and living conditions in Ljubljanica River which flows through capital city of Slovenia, Ljubljana. It represents living environment for endangered and Natura 2000 targeted fish species Danube Salmon (Hucho hucho), Danube Roach (Rutilus pigus) and Striped Chub (Leuciscus souffia). The project consists of four sets of activities: concrete restoration actions including improvement of two fish passes, monitoring of fish migration, monitoring of eco-hydrological parameters, and raising of public awareness. To improve living conditions the concrete restoration measures were performed. The reconstructions of sill and two fish passes on the Ljubljanica River have been implemented and barrier's lifting system on the weir was modernized. Above the sill in Zalog there is an oxbow which was disconnected with main river channel during the low flows. Interrupted inflow of fresh water caused very poor living conditions for animals in the oxbow. The raise of the sill helped to improve this situation. One of the fish passes included in the project is more than 100 years old whereas both are protected as cultural and technical heritage. None was working properly and due to the protection no visible nor drastic measures were allowed. With smaller improvements we managed to re-establish their operation. A lifting system of the barrier at the Ambrožev trg gate was outdated and did not allow precise regulation of the water level. Too fast raising of the barrier instantly caused deterioration of eco-hydrological conditions downstream. With modernization of the electromechanical equipment the situation is improved. The fish monitoring helps us to evaluate success of concrete restoration actions. The fish population status is monitored with marking the fish with Visible Implant Elastomer (VIE) tags. Regarding the location of catch we implant tags beneath transparent or translucent tissue combining different tag

  15. Quantifying Km-scale Hydrological Exchange Flows under Dynamic Flows and Their Influences on River Corridor Biogeochemistry

    Science.gov (United States)

    Chen, X.; Song, X.; Shuai, P.; Hammond, G. E.; Ren, H.; Zachara, J. M.

    2017-12-01

    Hydrologic exchange flows (HEFs) in rivers play vital roles in watershed ecological and biogeochemical functions due to their strong capacity to attenuate contaminants and process significant quantities of carbon and nutrients. While most of existing HEF studies focus on headwater systems with the assumption of steady-state flow, there is lack of understanding of large-scale HEFs in high-order regulated rivers that experience high-frequency stage fluctuations. The large variability of HEFs is a result of interactions between spatial heterogeneity in hydrogeologic properties and temporal variation in river discharge induced by natural or anthropogenic perturbations. Our 9-year spatially distributed dataset (water elevation, specific conductance, and temperature) combined with mechanistic hydrobiogeochemical simulations have revealed complex spatial and temporal dynamics in km-scale HEFs and their significant impacts on contaminant plume mobility and hyporheic biogeochemical processes along the Hanford Reach. Extended multidirectional flow behaviors of unconfined, river corridor groundwater were observed hundreds of meters inland from the river shore resulting from discharge-dependent HEFs. An appropriately sized modeling domain to capture the impact of regional groundwater flow as well as knowledge of subsurface structures controlling intra-aquifer hydrologic connectivity were essential to realistically model transient storage in this large-scale river corridor. This work showed that both river water and mobile groundwater contaminants could serve as effective tracers of HEFs, thus providing valuable information for evaluating and validating the HEF models. Multimodal residence time distributions with long tails were resulted from the mixture of long and short exchange pathways, which consequently impact the carbon and nutrient cycling within the river corridor. Improved understanding of HEFs using integrated observational and modeling approaches sheds light on

  16. Transport Corridors in the Russian Integration Projects, the Case of the Eurasian Economic Union

    Directory of Open Access Journals (Sweden)

    Olga A. Podberezkina

    2015-01-01

    Full Text Available The article discusses the political importance of transport corridors in terms of the development of integration projects in the post-Soviet space. The world is witnessing the formation of a single market and transport and communication infrastructure, which intensifies competition among regional and world leaders, both states and non-state actors, such as businesses, markets over the routes of transporting goods. In the medium and long term the value of the control over the transport routes will increase due to the dynamics of economic development in the Asia-Pacific region. Competition for the development of projects of international transport corridors (ITC between the leading countries in the region will increase, because the ITC entail the formation of a common political space, the reduction of tariff and customs barriers, which provides easy access to the markets of countries linked by ITCs and creates the preconditions for economic integration. The growing political importance of ITC is reflected in the fact that global leaders such as China, the US, the EU, are trying to create their own versions of international land transport corridors connecting Europe and Asia. China is trying to promote their transport project "Economic Belt Silk Road" European countries develop cooperation on ITC TRACECA with other countries of Eurasia. US also embody their interests through the implementation of the project by the ITC in Afghanistan. Transport corridors in Russia are seen as a way to integrate it into the global transportation system and logistics space. To do this, Russia needs to develop Eurasian transport corridors through its territory. As a result of the implementation of transport projects Russia will be able to ensure the transit of goods from China to Europe, which has a positive impact on the economic development of the regions through which they pass. Development of international transportation through Russia will unite many of the

  17. Using water quality to assess ecological condition in the St. Marys River and Huron-Erie Corridor

    Science.gov (United States)

    The St. Marys River and Huron-Erie-Corridor were assessed by EPA for the first time in 2014-2016 as part of the National Coastal Condition Assessment (NCCA). NCCA uses a probabilistic survey design to allow unbiased assessment of ecological condition across the entire Great Lakes...

  18. FINAL PROJECT REPORT: A Geophysical Characterization & Monitoring Strategy for Determining Hydrologic Processes in the Hyporheic Corridor at the Hanford 300-Area

    Energy Technology Data Exchange (ETDEWEB)

    Lee Slater

    2011-08-15

    The primary objective of this research was to advance the prediction of solute transport between the Uranium contaminated Hanford aquifer and the Columbia River at the Hanford 300 Area by improving understanding of how fluctuations in river stage, combined with subsurface heterogeneity, impart spatiotemporal complexity to solute exchange along the Columbia River corridor. Our work explored the use of continuous waterborne electrical imaging (CWEI), in conjunction with fiber-optic distributed temperature sensor (FO-DTS) and time-lapse resistivity monitoring, to improve the conceptual model for how groundwater/surface water exchange regulates uranium transport. We also investigated how resistivity and induced polarization can be used to generate spatially rich estimates of the variation in depth to the Hanford-Ringold (H-R) contact between the river and the 300 Area Integrated Field Research Challenge (IFRC) site. Inversion of the CWEI datasets (a data rich survey containing ~60,000 measurements) provided predictions of the distributions of electrical resistivity and polarizability, from which the spatial complexity of the primary hydrogeologic units along the river corridor was reconstructed. Variation in the depth to the interface between the overlying coarse-grained, high permeability Hanford Formation and the underlying finer-grained, less permeable Ringold Formation, an important contact that limits vertical migration of contaminants, has been resolved along ~3 km of the river corridor centered on the IFRC site in the Hanford 300 Area. Spatial variability in the thickness of the Hanford Formation captured in the CWEI datasets indicates that previous studies based on borehole projections and drive-point and multi-level sampling likely overestimate the contributing area for uranium exchange within the Columbia River at the Hanford 300 Area. Resistivity and induced polarization imaging between the river and the 300 Area IFRC further imaged spatial variability in

  19. Knowledge, Norms and Preferences for Tamarisk Management in the Green and Colorado River Corridors of the Colorado Plateau

    OpenAIRE

    Allred, E. Clay

    2012-01-01

    Extensive research exists regarding invasive alien plant species including impacts to native ecosystems and efficacy of control methods on public lands and river corridors. Many studies have identified the need for more research regarding the social implications of invasive alien species management. More specifically, additional research is needed regarding the impacts of invasive alien plant management on the Colorado Plateau to river-based recreation experiences. It is important for public ...

  20. From mountains to the ocean: quantifying connectivity along the river corridor

    Science.gov (United States)

    Gomez-Velez, J. D.; Harvey, J. W.

    2015-12-01

    Rivers are the landscape's arteries; they convey water, solutes, energy, and living organisms from the hillslopes, floodplains, aquifers, and atmosphere to the oceans. As water moves along this complex circulatory system, it is continuously exchanged with the surrounding alluvial aquifer, termed hyporheic exchange, which strongly conditions and constrains the biogeochemical evolution of water at the local scale with basin-scale consequences. Over the last two decades, considerable efforts have focused on the use of detailed mathematical models to explore the hydrodynamics and biogeochemical effect of hyporheic exchange at the scale of individual channel morphologies. While these efforts are essential to gain mechanistic understanding, their computational demand makes them impractical for basin applications. In this talk, a parsimonious but physically based model of hyporheic flow for application in large river basins is presented: Networks with EXchange and Subsurface Storage (NEXSS). At the core of NEXSS are the up-scaling of detailed mathematical models and a characterization of the channel geometry, geomorphic features, and related hydraulic drivers based on scaling equations from the literature and readily accessible information such as river discharge, width, grain size, sinuosity, channel slope, and regional groundwater gradients. As a proof-of-concept, we use NEXSS to characterize the spatial and temporal variability of hyporheic exchange and denitrification potential along the Mississippi River basin. This modeling approach allows us to map the location of critical hot spots for biogeochemical transformation, their geomorphic drivers, and cumulative effect. Finally, we discuss new avenues to incorporate exchange with floodplains and ponded waters, which also play a key role in water quality along the river corridor. This new modeling approach is critical to transition from purely empirical continental models of water quality to hybrid approaches that

  1. River Networks As Ecological Corridors for Species, Populations and Pathogens of Water-Borne Disease

    Science.gov (United States)

    Rinaldo, A.

    2014-12-01

    River basins are a natural laboratory for the study of the integration of hydrological, ecological and geomorphological processes. Moving from morphological and functional analyses of dendritic geometries observed in Nature over a wide range of scales, this Lecture addresses essential ecological processes that take place along dendritic structures, hydrology-driven and controlled, like e.g.: population migrations and human settlements, that historically proceeded along river networks to follow water supply routes; riparian ecosystems composition that owing to their positioning along streams play crucial roles in their watersheds and in the loss of biodiversity proceeding at unprecedented rates; waterborne disease spreading, like epidemic cholera that exhibits epidemic patterns that mirror those of watercourses and of human mobility and resurgences upon heavy rainfall. Moreover, the regional incidence of Schistosomiasis, a parasitic waterborne disease, and water resources developments prove tightly related, and proliferative kidney disease in fish thrives differently in pristine and engineered watercourses: can we establish quantitatively the critical linkages with hydrologic drivers and controls? How does connectivity within a river network affect community composition or the spreading mechanisms? Does the river basin act as a template for biodiversity or for species' persistence? Are there hydrologic controls on epidemics of water-borne disease? Here, I shall focus on the noteworthy scientific perspectives provided by spatially explicit eco-hydrological studies centered on river networks viewed as ecological corridors for species, populations and pathogens of waterborne disease. A notable methodological coherence is granted by the mathematical description of river networks as the support for reactive transport. The Lecture overviews a number of topics idiosyncratically related to my own research work but ideally aimed at a coherent body of materials and methods. A

  2. Non-Operational Property Evaluation for the Hanford Site River Corridor - 12409

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, John [CH2M HILL, Richland, Washington 99354 (United States); Aly, Alaa [CH2M HILL Plateau Remediation Company and INTERA Incorporated, Richland, Washington 99354 (United States)

    2012-07-01

    The Hanford Site River Corridor consists of the former reactor areas of the 100 Areas and the former industrial (fuel processing) area in the 300 Area. Most of the waste sites are located close to the decommissioned reactors or former industrial facilities along the Columbia River. Most of the surface area of the River Corridor consists of land with little or no subsurface infrastructure or indication of past or present releases of hazardous constituents, and is referred to as non-operational property or non-operational area. Multiple lines of evidence have been developed to assess identified fate and transport mechanisms and to evaluate the potential magnitude and significance of waste site-related contaminants in the non-operational area. Predictive modeling was used for determining the likelihood of locating waste sites and evaluating the distribution of radionuclides in soil based on available soil concentration data and aerial radiological surveys. The results of this evaluation indicated: 1) With the exception of stack emissions, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas, 2) Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides, and (3) the likelihood of detecting elevated radionuclide concentrations or other waste sites in non-operational area soils is very small. The overall conclusions from the NPE evaluation of the River Corridor are: - With the exception of stack emissions to the air, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas. While pathways such as windblown dust, overland transport and biointrusion have the potential for dispersing waste site contaminants, the resulting transport is unlikely to result in substantial contamination in non-operational areas. - Stack

  3. Green corridors basics

    DEFF Research Database (Denmark)

    Panagakos, George

    2016-01-01

    SuperGreen project, which aimed at advancing the green corridor concept through a benchmarking exercise involving Key Performance Indicators (KPIs). The chapter discusses the available definitions of green corridors and identifies the characteristics that distinguish a green corridor from any other...... efficient surface transportation corridor. After providing examples of green corridor projects in Europe, it focuses on the KPIs that have been proposed by various projects for monitoring the performance of a freight corridor. Emphasis is given to the SuperGreen KPIs, covering the economic, technical...

  4. River networks and ecological corridors: Reactive transport on fractals, migration fronts, hydrochory

    Science.gov (United States)

    Bertuzzo, E.; Maritan, A.; Gatto, M.; Rodriguez-Iturbe, I.; Rinaldo, A.

    2007-04-01

    Moving from a recent quantitative model of the US colonization in the 19th century that relies on analytical and numerical results of reactive-diffusive transport on fractal river networks, this paper considers its generalization to include an embedded flow direction which biases transport. We explore the properties of biased reaction-dispersal models, in which the reaction rates are described by a logistic equation. The relevance of the work is related to the prediction of the role of hydrologic controls on invasion processes (of species, populations, propagules, or infective agents, depending on the specifics of reaction and transport) occurring in river basins. Exact solutions are obtained along with general numerical solutions, which are applied to fractal constructs like Peano basins and real rivers. We also explore similarities and departures from different one-dimensional invasion models where a bias is added to both the diffusion and the telegraph equations, considering their respective ecological insight. We find that the geometrical constraints imposed by the fractal networks imply strong corrections on the speed of traveling fronts that can be enhanced or smoothed by the bias. Applications to real river networks show that the chief morphological parameters affecting the front speed are those characterizing the node-to-node distances measured along the network structure. The spatial density and number of reactive sites thus prove to be a vital hydrologic control on invasions. We argue that our solutions, currently tied to the validity of the logistic growth, might be relevant to the general study of species' spreading along ecological corridors defined by the river network structure.

  5. Conditions and processes affecting sand resources at archeological sites in the Colorado River corridor below Glen Canyon Dam, Arizona

    Science.gov (United States)

    East, Amy E.; Collins, Brian D.; Sankey, Joel B.; Corbett, Skye C.; Fairley, Helen C.; Caster, Joshua J.

    2016-05-17

    This study examined links among fluvial, aeolian, and hillslope geomorphic processes that affect archeological sites and surrounding landscapes in the Colorado River corridor downstream from Glen Canyon Dam, Arizona. We assessed the potential for Colorado River sediment to enhance the preservation of river-corridor archeological resources through aeolian sand deposition or mitigation of gully erosion. By identifying locally prevailing wind directions, locations of modern sandbars, and likely aeolian-transport barriers, we determined that relatively few archeological sites are now ideally situated to receive aeolian sand supply from sandbars deposited by recent controlled floods. Whereas three-fourths of the 358 river-corridor archeological sites we examined include Colorado River sediment as an integral component of their geomorphic context, only 32 sites currently appear to have a high degree of connectivity (coupled interactions) between modern fluvial sandbars and sand-dominated landscapes downwind. This represents a substantial decrease from past decades, as determined by aerial-photograph analysis. Thus, we infer that recent controlled floods have had a limited, and declining, influence on archeological-site preservation.

  6. The present condition and projection of construction of railway net of the Danube-Morava corridor

    Directory of Open Access Journals (Sweden)

    Vemić Mirčeta

    2005-01-01

    Full Text Available The railway net of the Danube-Morava corridor, together with the road net represent the central section of the Pan-European transport corridor X. According to the traffic and economic standards, the railway net represents the second main traffic direction of this corridor as the area-functioning system of the territory of Serbia. Main railway lines have favourable positions as they are located along prominent geographical features, namely river valleys thus enabling considerable flow of goods, passengers and information. The paper presents some characteristics of the present condition of the railway net, its functioning and safety, with certain ideas of its future construction and expected exploitation till 2015. Traffic infrastructure represents the initial factor of overall development of a state and its connection with the surrounding countries. It is considered to be of strategic importance for a country to built railway net. Improvement and additional construction of railway lines is of the greatest priority for the purpose of enlargement of overall mobility and quality of life of population, to make urban areas closer, to improve connections, functions efficiency and level of services of railway system, reduction of negative influence on other economic systems and human environment, better safety etc.

  7. Analysis of Florida Department Of Transportation Transit Corridor Program/Projects: Technical Memorandum Number Three - General Recommendations

    Science.gov (United States)

    2001-03-01

    CUTR interviewed FDOT personnel at both the Central Office and Distict Offices and agency personnel to discuss the strengths and weaknesses of the overall Transit Corridor Program, including the results of specific projects, as well as the FDOT proce...

  8. Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...

  9. Chapter 1: Hydrologic exchange flows and their ecological consequences in river corridors

    Science.gov (United States)

    Harvey, Judson

    2016-01-01

    emerging (eg, hydrologic connectivity) that emphasize HEF functions in river corridors over a wide range of spatial and temporal scales.

  10. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  11. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  12. Niche construction within riparian corridors. Part I: Exploring biogeomorphic feedback windows of three pioneer riparian species (Allier River, France)

    Science.gov (United States)

    Hortobágyi, Borbála; Corenblit, Dov; Steiger, Johannes; Peiry, Jean-Luc

    2018-03-01

    Within riparian corridors, biotic-abiotic feedback mechanisms occur between woody vegetation strongly influenced by hydrogeomorphic constraints (e.g., sediment transport and deposition, shear stress, hydrological variability), fluvial landforms, and morphodynamics, which in turn are modulated by the established vegetation. During field investigations in spring 2015, we studied 16 alluvial bars (e.g., point and lateral bars) within the dynamic riparian corridor of the Allier River (France) to assess the aptitude of three pioneer riparian Salicaceae species (Populus nigra L., Salix purpurea L., and Salix alba L.) to establish and act as ecosystem engineers by trapping sediment and constructing fluvial landforms. Our aim is to empirically identify the preferential establishment area (EA; i.e., the local areas where species become established) and the preferential biogeomorphic feedback window (BFW; i.e., where and to what extent the species and geomorphology interact) of these three species on alluvial bars within a 20-km-long river reach. Our results show that the EA and BFW of all three species vary significantly along the longitudinal profile, i.e., upstream-downstream exposure on the alluvial bars, as well as transversally, i.e., the main hydrological connectivity gradient from the river channel toward the floodplain. In the present-day context of the Allier River, P. nigra is the most abundant species, appearing to act as the main engineer species affecting landform dynamics at the bar scale; S. purpurea is established and acts as an ecosystem engineer at locations on alluvial bars that are most exposed to hydrosedimentary flow dynamics, while S. alba is established on the bar tail close to secondary channels and affects the geomorphology in mixed patches along with P. nigra. Our study highlights the role of functional trait diversity of riparian engineer species in controlling the extent of fluvial landform construction along geomorphic gradients within riparian

  13. Savannah River bus project

    Energy Technology Data Exchange (ETDEWEB)

    Summers, W.A. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1998-08-01

    The H2Fuel Bus is the world`s first hybrid hydrogen electric transit bus. It was developed through a public/private partnership involving several leading technology and industrial organizations in the Southeast, with primary funding and program management provided by the Department of Energy. The primary goals of the project are to gain valuable information on the technical readiness and economic viability of hydrogen buses and to enhance the public awareness and acceptance of emerging hydrogen technologies. The bus has been operated by the transit agency in Augusta, Georgia since April, 1997. It employs a hybrid IC engine/battery/electric drive system, with onboard hydrogen fuel storage based on the use of metal hydrides. Initial operating results have demonstrated an overall energy efficiency (miles per Btu) of twice that of a similar diesel-fueled bus and an operating range twice that of an all-battery powered electric bus. Tailpipe emissions are negligible, with NOx less than 0.2 ppm. Permitting, liability and insurance issues were addressed on the basis of extensive risk assessment and safety analyses, with the inherent safety characteristic of metal hydride storage playing a major role in minimizing these concerns. Future plans for the bus include continued transit operation and use as a national testbed, with potential modifications to demonstrate other hydrogen technologies, including fuel cells.

  14. US-75 ICM system as-built design : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    This As-Built document for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US Department of Transportation Integrated Corridor Management Initiative. The basic premise behind the ICM initiative is that indepen...

  15. Relations of water-quality constituent concentrations to surrogate measurements in the lower Platte River corridor, Nebraska, 2007 through 2011

    Science.gov (United States)

    Schaepe, Nathaniel J.; Soenksen, Philip J.; Rus, David L.

    2014-01-01

    The lower Platte River, Nebraska, provides drinking water, irrigation water, and in-stream flows for recreation, wildlife habitat, and vital habitats for several threatened and endangered species. The U.S. Geological Survey (USGS), in cooperation with the Lower Platte River Corridor Alliance (LPRCA) developed site-specific regression models for water-quality constituents at four sites (Shell Creek near Columbus, Nebraska [USGS site 06795500]; Elkhorn River at Waterloo, Nebr. [USGS site 06800500]; Salt Creek near Ashland, Nebr. [USGS site 06805000]; and Platte River at Louisville, Nebr. [USGS site 06805500]) in the lower Platte River corridor. The models were developed by relating continuously monitored water-quality properties (surrogate measurements) to discrete water-quality samples. These models enable existing web-based software to provide near-real-time estimates of stream-specific constituent concentrations to support natural resources management decisions. Since 2007, USGS, in cooperation with the LPRCA, has continuously monitored four water-quality properties seasonally within the lower Platte River corridor: specific conductance, water temperature, dissolved oxygen, and turbidity. During 2007 through 2011, the USGS and the Nebraska Department of Environmental Quality collected and analyzed discrete water-quality samples for nutrients, major ions, pesticides, suspended sediment, and bacteria. These datasets were used to develop the regression models. This report documents the collection of these various water-quality datasets and the development of the site-specific regression models. Regression models were developed for all four monitored sites. Constituent models for Shell Creek included nitrate plus nitrite, total phosphorus, orthophosphate, atrazine, acetochlor, suspended sediment, and Escherichia coli (E. coli) bacteria. Regression models that were developed for the Elkhorn River included nitrate plus nitrite, total Kjeldahl nitrogen, total phosphorus

  16. Colonisation trends of the invasive plant, Impatiens glandulifera, along river corridors: some preliminary findings

    Science.gov (United States)

    Greenwood, Phil; Kuhn, Brigitte; Kuhn, Nikolaus

    2016-04-01

    -density, finer grain-size characteristics, and possibly higher total phosphorous (TP) content, when compared against soils from nearby uncontaminated areas. Approximately 250 pairs of (contaminated and uncontaminated) soil samples were obtained from nine different sub-catchments located in four different European countries; namely, France, Germany, Switzerland and the UK. Sample pairs were sub-divided into contaminated & uncontaminated soils and each variable was subjected to a pair-wise statistical test; firstly for all catchments combined, and then on a catchment-by-catchment basis, to determine whether differences were significant. In addition to the above analyses, further evidence of spatial and topographic colonisation tendencies was sought from digital imagery captured using a remotely-controlled drone (quadcopter) flown along a ca. 1.0 km section of contaminated river corridor. Images were georeferenced, displayed together in a Geographic Information System (GIS) and used to construct a 3-dimensional digital elevation model (DEM). The DEM was interrogated to determine the presence / absence of colonisation trends (i.e. a tendency to colonise low-lying areas). This communication reports preliminary findings from this ongoing work and discusses key implications and possible future directions.

  17. Denitrification capacity and greenhouse gas emissions of soils in channelized and restored reaches along an Alpine river corridor

    Science.gov (United States)

    Shrestha, Juna; Niklaus, Pascal; Samaritani, Emanuela; Frossard, Emmanuel; Tockner, Klement; Luster, Jörg

    2010-05-01

    In order to assess the effects of river restoration on water and air quality, the biogeochemical functions of channelized and restored river reaches have to be quantified. The objective of this study was to compare denitrification potential and greenhouse gas emissions of functional processing zones (FPZ) in a channelized and a recently restored reach of the alpine river Thur in north-eastern Switzerland. The study was part of the project cluster RECORD of the ETH domain, Switzerland, which was initiated to increase the mechanistic understanding of coupled hydrological and ecological processes in river corridors. The denitrification potential represents an important aspect of the soil filter function related to water quality. Besides, it also contributes to the emission of greenhouse gases. Extensively used pasture growing on a sandy loam is the characteristic FPZ of the channelized section. The restored section encompasses five FPZ: (i) bare gravel bars sparsely colonized by plants, (ii) gravel bars densely colonized by grass (mainly canary reed grass with up to 80 cm sandy deposits), (iii) mixed forest dominated by ash and maple, (iv) riparian forest dominated by willow (Salix alba), (v) older overbank sediments stabilized during restoration with young willows separating the forests from the river-gravel bar system (willow bush). The FPZ were sampled in January, April, August and October 2009. In addition, in June and July 2009 two flood events were monitored in the restored section with more frequent samplings. At each date, topsoil samples were collected in each FPZ (four replicates per samples) and analyzed for denitrifier enzyme activity (DEA). In addition, gas samples were taken in-situ using the closed chamber technique to measure soil respiration as well as N2O and CH4 fluxes. In all FPZ, the denitrification potential was mainly governed by soil moisture. It was highest in the willow forest exhibiting low spatial variability. The DEA in pasture, grass zone

  18. Colonization Habitat Controls Biomass, Composition, and Metabolic Activity of Attached Microbial Communities in the Columbia River Hyporheic Corridor

    Energy Technology Data Exchange (ETDEWEB)

    Stern, Noah; Ginder-Vogel, Matthew; Stegen, James C.; Arntzen, Evan; Kennedy, David W.; Larget, Bret R.; Roden, Eric E.; Kostka, Joel E.

    2017-06-09

    Hydrologic exchange plays a critical role in biogeochemical cycling within the hyporheic zone (the interface between river water and groundwater) of riverine ecosystems. Such exchange may set limits on the rates of microbial metabolism and impose deterministic selection on microbial communities that adapt to dynamically changing dissolved organic carbon (DOC) sources. This study examined the response of attached microbial communities (in situcolonized sand packs) from groundwater, hyporheic, and riverbed habitats within the Columbia River hyporheic corridor to “cross-feeding” with either groundwater, river water, or DOC-free artificial fluids. Our working hypothesis was that deterministic selection duringin situcolonization would dictate the response to cross-feeding, with communities displaying maximal biomass and respiration when supplied with their native fluid source. In contrast to expectations, the major observation was that the riverbed colonized sand had much higher biomass and respiratory activity, as well as a distinct community structure, compared with those of the hyporheic and groundwater colonized sands. 16S rRNA gene amplicon sequencing revealed a much higher proportion of certain heterotrophic taxa as well as significant numbers of eukaryotic algal chloroplasts in the riverbed colonized sand. Significant quantities of DOC were released from riverbed sediment and colonized sand, and separate experiments showed that the released DOC stimulated respiration in the groundwater and piezometer colonized sand. These results suggest that the accumulation and degradation of labile particulate organic carbon (POC) within the riverbed are likely to release DOC, which may enter the hyporheic corridor during hydrologic exchange, thereby stimulating microbial activity and imposing deterministic selective pressure on the microbial community composition.

    IMPORTANCEThe influence of river water

  19. Evidence of the St. Clair-Detroit River system as a dispersal corridor and nursery habitat for transient larval burbot

    Science.gov (United States)

    McCullough, Darrin E.; Roseman, Edward F.; Keeler, Kevin M.; DeBruyne, Robin L.; Pritt, Jeremy J.; Thompson, Patricia A.; Ireland, Stacey A.; Ross, Jason E.; Bowser, Dustin; Hunter, Robert D.; Castle, Dana Kristina; Fischer, Jason; Provo, Stacy A.

    2015-01-01

    Burbot Lota lota are distributed across the Laurentian Great Lakes where they occupy a top piscivore role. The St. Clair-Detroit River System is known to provide a migration corridor as well as spawning and nursery habitat for many indigenous fishes of economic and ecological significance. However, knowledge is scant of the early life history of burbot and the importance of this system in their dispersal, survival, and recruitment. In order to assess the role of the St. Clair-Detroit River System to burbot ecology, we collected larval burbot during ichthyoplankton surveys in this system from 2010 to 2013 as part of a habitat restoration monitoring program. More and larger burbot larvae were found in the St. Clair River than in the lower Detroit River, although this may be due to differences in sampling methods between the two rivers. Consistent with existing studies, larval burbot exhibited ontogenesis with a distinct transition from a pelagic zooplankton-based diet to a benthic macroinvertebrate-based diet. Our results demonstrate that the St. Clair-Detroit Rivers provide food resources, required habitat, and a migration conduit between the upper and lower Great Lakes, but the contribution of these fish to the lower lakes requires further examination.

  20. Simulated Effects of Year 2030 Water-Use and Land-Use Changes on Streamflow near the Interstate-495 Corridor, Assabet and Upper Charles River Basins, Eastern Massachusetts

    Science.gov (United States)

    Carlson, Carl S.; Desimone, Leslie A.; Weiskel, Peter K.

    2008-01-01

    Continued population growth and land development for commercial, industrial, and residential uses have created concerns regarding the future supply of potable water and the quantity of ground water discharging to streams in the area of Interstate 495 in eastern Massachusetts. Two ground-water models developed in 2002-2004 for the Assabet and Upper Charles River Basins were used to simulate water supply and land-use scenarios relevant for the entire Interstate-495 corridor. Future population growth, water demands, and commercial and residential growth were projected for year 2030 by the Metropolitan Area Planning Council. To assess the effects of future development on subbasin streamflows, seven scenarios were simulated by using existing computer-based ground-water-flow models with the data projected for year 2030. The scenarios incorporate three categories of projected 2030 water- and land-use data: (1) 2030 water use, (2) 2030 land use, and (3) a combination of 2030 water use and 2030 land use. Hydrologic, land-use, and water-use data from 1997 through 2001 for the Assabet River Basin study and 1989 through 1998 for the Upper Charles River Basin study were used to represent current conditions - referred to as 'basecase' conditions - in each basin to which each 2030 scenario was compared. The effects of projected 2030 land- and water-use change on streamflows in the Assabet River Basin depended upon the time of year, the hydrologic position of the subbasin in the larger basin, and the relative areas of new commercial and residential development projected for a subbasin. Effects of water use and land use on streamflow were evaluated by comparing average monthly nonstorm streamflow (base flow) for March and September simulated by using the models. The greatest decreases in streamflow (up to 76 percent in one subbasin), compared to the basecase, occurred in September, when streamflows are naturally at their lowest level. By contrast, simulated March streamflows

  1. Ecological corridors, connecting science and politics : the case of the Green River in the Netherlands

    NARCIS (Netherlands)

    Van der Windt, Henny J.; Swart, J. A. A.

    1. During recent decades, the ecological corridor has become a popular concept among ecologists, politicians and nature conservationists. However, it has been criticized from a scientific point of view. In this paper we question why this concept has been accepted so readily in policy and practice.

  2. River Floodplains as Habitat and Bio-Corridors for Distribution of Land Snails: Their Past and Present

    Directory of Open Access Journals (Sweden)

    Horáčková Jitka

    2015-12-01

    Full Text Available River floodplains of Czech rivers serve as refugia to woodland or hydrophilous gastropods, in current intensively agriculturally utilised, urbanised and largely fragmented landscape. This habitat often form one of the last refuge and replace the natural habitat of these species. River floodplains also represent linear bio-corridors in landscape and allow gastropods to spread through the landscape in both directions, up and down the stream. We showed based on available fossil mollusc successions that development of the floodplain mollusc fauna took place quite different way in various river floodplains, depending on their specifics and geographical location, because especially the ones situated in the chernozem area of the Czech Republic had very different history in comparison with those in higher altitudes. The species richness and composition of recent floodplain malacofauna arises from historical development of particular area/site and depends also on environmental factors such as an elevation, humidity gradient, vegetation type and its biomass, light conditions of the site and soil reaction. Recently, the invasive plants represent a serious problem for current floodplain ecosystems; species richness and abundances of terrestrial mollusc floodplain assemblages are changing due to their effect. The impact on gastropods is species-specific and was described for the following species: Impatiens glandulifera, Fallopia japonica subsp. japonica, F. sachalinensis, F. ×bohemica.

  3. Pavement and riparian forest shape the bird community along an urban river corridor

    Directory of Open Access Journals (Sweden)

    Christopher J.W. McClure

    2015-07-01

    Full Text Available Knowledge of habitat use by animals within urban-riparian corridors during the breeding season is important for conservation, yet remains understudied. We examined the bird community along an urban-riparian corridor through metropolitan Boise, Idaho and predicted that occupancy of individual species and species richness would be greater in forested areas than in urbanized areas. We surveyed birds throughout the summers of 2009 and 2010 and quantified the m2 of each cover-type within 50-m, 100-m, and 200-m buffers surrounding each survey location using satellite imagery. Occupancy modeling revealed that eight of 14 species analyzed were positively associated with riparian forest, and no species avoided forest. Species richness was negatively associated with the amount of paved surface within 100 m of a survey site with richness declining by more than two species for every hectare of paved surface. Most associations with cover-types–especially riparian forest–were at ⩾100 m. Therefore, the riparian forest within 100 m of a given site along an urban-riparian corridor should be the most important for maintaining species richness.

  4. Humin to Human: Organic carbon, sediment, and water fluxes along river corridors in a changing world

    Energy Technology Data Exchange (ETDEWEB)

    Sutfin, Nicholas Alan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-20

    This is a presentation with slides on What does it mean to be human? ...humin?; River flow and Hydrographs; Snake River altered hydrograph (Marston et al., 2005); Carbon dynamics are important in rivers; Rivers and streams as carbon sink; Reservoirs for organic carbon; Study sites in Colorado; River morphology; Soil sample collection; Surveys at RMNP; Soil organic carbon content at RMNP; Abandoned channels and Cutoffs; East River channel migration and erosion; Linking hydrology to floodplain sediment flux; Impact of Extreme Floods on Floodplain Sediment; Channel Geometry: RMNP; Beavers dams and multithread channels; Geomorphology and carbon in N. St. Vrain Creek; Geomorphology and carbon along the East River; Geomorphology and carbon in N. St. Vrain Creek; San Marcos River, etc.

  5. 75 FR 17756 - Blackstone River Valley National Heritage Corridor Commission: Notice of Meeting

    Science.gov (United States)

    2010-04-07

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Blackstone River Valley National Heritage..., United States Code, that a meeting of the John H. Chafee Blackstone River Valley National Heritage... the meeting to: Jan H. Reitsma, Executive Director, John H. Chafee, Blackstone River Valley National...

  6. Natural-color and color-infrared image mosaics of the Colorado River corridor in Arizona derived from the May 2009 airborne image collection

    Science.gov (United States)

    Davis, Philip A.

    2013-01-01

    -processing software. The tiff world files (tfw) are provided, even though they are generally not needed for most software to read an embedded geotiff image. All image data are projected in the State Plane (SP) map projection using the central Arizona zone (202) and the North American Datum of 1983 (NAD83). The map-tile scheme used to segment the corridor image mosaic followed the standard USGS quarter-quadrangle (QQ) map borders, but the high resolution (20 cm) of the images required further quarter segmentation (QQQ) of the standard QQ tiles, where the image mosaic covered a large fraction of a QQ map tile (segmentation shown in (figure 6), where QQ_1 to QQ_4 shows the number convention used to designate a quarter of a QQ tile). To minimize the size of each image tile, each image or map tile was subset to only include that part of the tile that had image data. In addition, some QQQ image tiles within a QQ tile were combined when adjacent QQQ map tiles were small. Thus, some image tiles consist of combinations of QQQ map tiles, some consist of an entire QQ map tile, and some consist of two adjoining QQ map tiles. The final image tiles number 143, which is a large number of files to list on the Internet for both the natural-color and color-infrared images. Thus, the image tiles were placed in seven file folders based on the one-half-degree geographic boundaries within the study area (fig. 7). The map tiles in each file folder were compressed to minimize folder size for more efficient downloading. The file folders are sequentially referred to as zone 1 through zone 7, proceeding down river (fig. 7). The QQ designations of the image tiles contained within each folder or zone are shown on the index map for each respective zone (figs. 8–14).

  7. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  8. Pollution from aircraft emissions in the North Atlantic flight corridor. Overview on the results of the POLINAT project

    Energy Technology Data Exchange (ETDEWEB)

    Schumann, U; Duerbeck, T; Feigl, C [Deutsche Forschungsanstalt fuer Luft- und Raumfahrt e.V. (DLR), Wessling (Germany); Arnold, F; Droste-Franke, B [Max-Planck-Inst. fuer Kernphysik, Heidelberg (Germany); Flatoy, F [Bergen Univ. (Norway). Inst. of Geophysics; Ford, I J [University Coll., London (United Kingdom); Hagen, D E; Hopkins, A R [Missouri Univ., Rolla, MO (United States). Lab. for Cloud and Aerosol Sciences; Hayman, G D [National Environmental Technology Centre, AEA Technology, Culham (United Kingdom); others, and

    1998-12-31

    The POLINAT project (phase 1) was performed 1994 to 1996 within the Environment Research Programme of the European Commission. POLINAT-2 is being performed now since April 1996. The objectives of POLINAT-1 and -2, the methods used, the measurements, and some selected results are described. Details are given on the measured background concentrations, the emission indices of several aircraft, comparisons between modelled and measured data, and the impact of the emissions within the North Atlantic flight corridor. (author) 21 refs.

  9. Pollution from aircraft emissions in the North Atlantic flight corridor. Overview on the results of the POLINAT project

    Energy Technology Data Exchange (ETDEWEB)

    Schumann, U.; Duerbeck, T.; Feigl, C. [Deutsche Forschungsanstalt fuer Luft- und Raumfahrt e.V. (DLR), Wessling (Germany); Arnold, F.; Droste-Franke, B. [Max-Planck-Inst. fuer Kernphysik, Heidelberg (Germany); Flatoy, F. [Bergen Univ. (Norway). Inst. of Geophysics; Ford, I.J. [University Coll., London (United Kingdom); Hagen, D.E.; Hopkins, A.R. [Missouri Univ., Rolla, MO (United States). Lab. for Cloud and Aerosol Sciences; Hayman, G.D. [National Environmental Technology Centre, AEA Technology, Culham (United Kingdom); and others

    1997-12-31

    The POLINAT project (phase 1) was performed 1994 to 1996 within the Environment Research Programme of the European Commission. POLINAT-2 is being performed now since April 1996. The objectives of POLINAT-1 and -2, the methods used, the measurements, and some selected results are described. Details are given on the measured background concentrations, the emission indices of several aircraft, comparisons between modelled and measured data, and the impact of the emissions within the North Atlantic flight corridor. (author) 21 refs.

  10. Heritage Conservation in River Corridor Cities. The Case of Tripoli, Lebanon.

    OpenAIRE

    Ginzarly, Manal; Teller, Jacques

    2016-01-01

    This article recognizes rivers as cultural heritage landscapes, as an integral component of cities common heritage and an element of collective memory and identity. It is based on the consideration that analysis of the socio-spatial relationship between the river and urban structure at different historical period can further lead to knowledge about the river contribution in forming the identity and sense of place of an urban area. This knowledge can be used to inform urban conservation as wel...

  11. 75 FR 64741 - Blackstone River Valley National Heritage Corridor Commission: Notice of Meeting

    Science.gov (United States)

    2010-10-20

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Blackstone River Valley National Heritage..., United States Code, that a meeting of the John H. Chafee Blackstone River Valley National Heritage... should be made prior to the meeting to: Jan H. Reitsma, Executive Director, John H. Chafee, Blackstone...

  12. 75 FR 2885 - Blackstone River Valley National Heritage Corridor Commission: Notice of Meeting

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Blackstone River Valley National Heritage..., United States Code, that a meeting of the John H. Chafee Blackstone River Valley National Heritage... should be made prior to the meeting to: Jan H. Reitsma, Executive Director, John H. Chafee Blackstone...

  13. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with

  14. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  15. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  16. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  17. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  18. Groundwater discharge to the Mississippi River and groundwater balances for the Interstate 94 Corridor surficial aquifer, Clearwater to Elk River, Minnesota, 2012–14

    Science.gov (United States)

    Smith, Erik A.; Lorenz, David L.; Kessler, Erich W.; Berg, Andrew M.; Sanocki, Chris A.

    2017-12-13

    The Interstate 94 Corridor has been identified as 1 of 16 Minnesota groundwater areas of concern because of its limited available groundwater resources. The U.S. Geological Survey, in cooperation with the Minnesota Department of Natural Resources, completed six seasonal and annual groundwater balances for parts of the Interstate 94 Corridor surficial aquifer to better understand its long-term (next several decades) sustainability. A high-precision Mississippi River groundwater discharge measurement of 5.23 cubic feet per second per mile was completed at low-flow conditions to better inform these groundwater balances. The recharge calculation methods RISE program and Soil-Water-Balance model were used to inform the groundwater balances. For the RISE-derived recharge estimates, the range was from 3.30 to 11.91 inches per year; for the SWB-derived recharge estimates, the range was from 5.23 to 17.06 inches per year.Calculated groundwater discharges ranged from 1.45 to 5.06 cubic feet per second per mile, a ratio of 27.7 to 96.4 percent of the measured groundwater discharge. Ratios of groundwater pumping to total recharge ranged from 8.6 to 97.2 percent, with the longer-term groundwater balances ranging from 12.9 to 19 percent. Overall, this study focused on the surficial aquifer system and its interactions with the Mississippi River. During the study period (October 1, 2012, through November 30, 2014), six synoptic measurements, along with continuous groundwater hydrographs, rainfall records, and a compilation of the pertinent irrigation data, establishes the framework for future groundwater modeling efforts.

  19. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R.Todd

    1996-05-01

    During the 1995 - 96 project period, four new habitat enhancement projects were implemented under the Umatilla River Basin Anadromous Fish Habitat Enhancement Project by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) in the upper Umatilla River Basin. A total of 38,644 feet of high tensile smooth wire fencing was constructed along 3.6 miles of riparian corridor in the Meacham Creek, Wildhorse Creek, Greasewood Creek, West Fork of Greasewood Creek and Mission Creek watersheds. Additional enhancements on Wildhorse Creek and the lower Greasewood Creek System included: (1) installation of 0.43 miles of smooth wire between river mile (RM) 10.25 and RM 10.5 Wildhorse Creek (fence posts and structures had been previously placed on this property during the 1994 - 95 project period), (2) construction of 46 sediment retention structures in stream channels and maintenance to 18 existing sediment retention structures between RM 9.5 and RM 10.25 Wildhorse Creek, and (3) revegetation of stream corridor areas and adjacent terraces with 500 pounds of native grass seed or close species equivalents and 5,000 native riparian shrub/tree species to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. U.S. Fish and Wildlife Service (USFWS), Bureau of Indian Affairs (BIA) and Environmental Protection Agency (EPA) funds were cost shared with Bonneville Power Administration (BPA) funds, provided under this project, to accomplish habitat enhancements. Water quality monitoring continued and was expanded for temperature and turbidity throughout the upper Umatilla River Watershed. Physical habitat surveys were conducted on the lower 13 river miles of Wildhorse Creek and within the Greasewood Creek Project Area to characterize habitat quality and to quantify various habitat types by area.

  20. Estuary fish data - Juvenile salmon in migratory corridors of lower Columbia River estuary

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Sampling juvenile salmon and associated fishes in open waters of the lower Columbia River estuary. Field work includes bi-weekly sampling during the spring...

  1. 76 FR 60587 - Environmental Impact Statement; North Corridor Transit Project, Seattle (WA) Metropolitan Area...

    Science.gov (United States)

    2011-09-29

    ... Lake Washington to the east, which limits transportation options. This dense urban area comprises one... and activity centers located in the North Corridor and the other urban centers in the Central Puget... elevated or at-grade profiles or station locations and layouts. Potential SR 99 Light Rail Alternatives A...

  2. More dams planned for Nitassinan Rivers : Innu Nation backgrounder on the proposed Churchill River hydro projects

    International Nuclear Information System (INIS)

    1999-01-01

    The Labrador Innu have expressed their concerns regarding the proposed development of a huge hydroelectric project for the Nitassinan Rivers. The Innu people were not consulted regarding the negotiations which will take place between Newfoundland and Quebec. The biggest concern of the Innu people is the cumulative environmental and social effects of the proposed development and how it will contribute to opening up their territory to further development. For example, access roads, transmission corridors and large-scale clear-cut forestry operations would all impact on their traditional way of life. This paper also described the impacts that the Innu have already experienced as a result of hydroelectric development on the Nitassinan Rivers during the 1970s, when the government of Newfoundland gave the rights to develop and exploit water resources, forests and minerals to a private company. At that time, large areas of hunting and trapping territories were flooded, belongings were lost and burial sites were flooded. The flooding also resulted in increased levels of methyl mercury in fish in the reservoirs as well as downstream. The losses suffered by the Innu people have yet to be addressed by the governments

  3. Walla Walla River Basin Fish Habitat Enhancement Project, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2001-01-01

    In 2000, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. Six projects, two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River were part of the exercise. Several thousand native plants as bare-root stock and cuttings were reintroduced to the sites and 18 acres of floodplain corridor was seeded with native grass seed. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan.

  4. 77 FR 61631 - Final Environmental Impact Statement for Stehekin River Corridor Implementation Plan, Lake Chelan...

    Science.gov (United States)

    2012-10-10

    ... scenic resources and threats within debris flow hazard zones. Decision Process: Not sooner than 30 days... natural processes of the Stehekin River; and (3) partner with the Stehekin Community to provide services... priorities in the floodplain, and therefore far fewer private parcels would be high priority for purchase or...

  5. Modern comprehensive approach to monitor the morphodynamic evolution of restored river corridors

    NARCIS (Netherlands)

    Pasquale, N; Perona, P; Schneider, P.; Shrestha, J.; Wombacher, Andreas; Burlando, P

    2011-01-01

    River restoration has become a common measure to repair anthropogenically-induced alteration of fluvial ecosystems. The inherent complexity of ecohydrologic systems leads to limitations in understanding the response of such systems to restoration over time. Therefore, a significant effort has been

  6. From corridor to region

    DEFF Research Database (Denmark)

    Jensen, Anne; Jespersen, Per Homann

    2006-01-01

    The corridor between Oslo and Berlin is by the politicians of the regional authorities in the Scandinavian part of the corridor seen a region with unique qualities and a large innovation and growth potential. In order to explore and develop this potential an In-terreg project has been launched...... this task by applying principles of participative planning and with action research methodology are involving stakeholders in the process of defining, developing and disseminating the idea of the Corridor of Innovation and Cooperation - COINCO....

  7. Lower Red River Meadow Stream Restoration Project

    International Nuclear Information System (INIS)

    1996-05-01

    As part of a continuing effort to restore anadromous fish populations in the South Fork Clearwater River basin of Idaho, Bonneville Power Administration (BPA) proposes to fund the Lower Red River Meadow Restoration Project (Project). The Project is a cooperative effort with the Idaho Soil and Water Conservation District, Nez Perce National Forest, Idaho Department of Fish and Game (IDFG), and the Nez Perce Tribe of Idaho. The proposed action would allow the sponsors to perform stream bank stabilization, aquatic and riparian habitat improvement activities on IDFG's Red River Management Area and to secure long-term conservation contracts or agreements for conducting streambank and habitat improvement activities with participating private landowners located in the Idaho County, Idaho, study area. This preliminary Environmental Assessment (EA) examines the potential environmental effects of stabilizing the stream channel, restoring juvenile fish rearing habitat and reestablishing a riparian shrub community along the stream

  8. Seiche-induced unsteady flows in the Huron-Erie Corridor: Spectral analysis of oscillations in stage and discharge in the St. Clair and Detroit Rivers

    Science.gov (United States)

    Jackson, P. Ryan; Contantinescu, G.; Garcia, M.; Hanes, D.

    2016-01-01

    Animations of highly dynamic water-surface profiles through the St. Clair and Detroit Rivers have identified transient disturbances propagating from Lakes Huron and Erie into the St. Clair and Detroit Rivers, respectively. To determine any relation to seiche and tidal oscillations on Lakes Huron and Erie, a spectral analysis was performed on stage and discharge data from the Huron-Erie Corridor. There is excellent agreement between the observed oscillations in stage and discharge in the St. Clair and Detroit Rivers and the documented frequencies of oscillations in Lakes Huron and Erie. The fundamental seiche, some higher-order seiche modes, and the semidiurnal tide from Lakes Huron and Erie are evident in the stage and discharge records at gages along the St. Clair and Detroit Rivers, respectively. Lake St. Clair appears to act as a damper in the system. If not accounted for, these oscillations may complicate monitoring, modeling, and restoration of this system.

  9. Development of a high-resolution binational vegetation map of the Santa Cruz River riparian corridor and surrounding watershed, southern Arizona and northern Sonora, Mexico

    Science.gov (United States)

    Wallace, Cynthia S.A.; Villarreal, Miguel L.; Norman, Laura M.

    2011-01-01

    This report summarizes the development of a binational vegetation map developed for the Santa Cruz Watershed, which straddles the southern border of Arizona and the northern border of Sonora, Mexico. The map was created as an environmental input to the Santa Cruz Watershed Ecosystem Portfolio Model (SCWEPM) that is being created by the U.S. Geological Survey for the watershed. The SCWEPM is a map-based multicriteria evaluation tool that allows stakeholders to explore tradeoffs between valued ecosystem services at multiple scales within a participatory decision-making process. Maps related to vegetation type and are needed for use in modeling wildlife habitat and other ecosystem services. Although detailed vegetation maps existed for the U.S. side of the border, there was a lack of consistent data for the Santa Cruz Watershed in Mexico. We produced a binational vegetation classification of the Santa Cruz River riparian habitat and watershed vegetation based on NatureServe Terrestrial Ecological Systems (TES) units using Classification And Regression Tree (CART) modeling. Environmental layers used as predictor data were derived from a seasonal set of Landsat Thematic Mapper (TM) images (spring, summer, and fall) and from a 30-meter digital-elevation-model (DEM) grid. Because both sources of environmental data are seamless across the international border, they are particularly suited to this binational modeling effort. Training data were compiled from existing field data for the riparian corridor and data collected by the NM-GAP (New Mexico Gap Analysis Project) team for the original Southwest Regional Gap Analysis Project (SWReGAP) modeling effort. Additional training data were collected from core areas of the SWReGAP classification itself, allowing the extrapolation of the SWReGAP mapping into the Mexican portion of the watershed without collecting additional training data.

  10. Evidence for a marine incursion along the lower Colorado River corridor

    Science.gov (United States)

    McDougall, Kristin; Martínez, Adriana Yanet Miranda

    2014-01-01

    Foraminiferal assemblages in the stratigraphically lower part of the Bouse Formation in the Blythe Basin indicate marine conditions whereas assemblages in the upper part of the Bouse Formation indicate lacustrine conditions and suggest the presence of a saline lake. Benthic foraminiferal assemblages in the lower part of the Bouse Formation are similar to lagoonal and inner neritic biofacies of the modern Gulf of California. Evidence suggesting a change from marine to lacustrine conditions includes the highest occurrence of planktic foraminifers at an elevation of 123 m asl, the change from low diversity to monospecific foraminiferal assemblages composed only of Ammonia beccarii (between 110 to126 m asl), an increase in abundance of A. beccarii specimens (above ~110 m asl), increased number of deformed tests (above ~123 m asl), first appearance of Chara (at ~85 m asl), lowest occurrence of reworked Cretaceous coccoliths (at ~110 m), a decrease in strontium isotopic values (between 70-120 m), and δ18O and δ13C values similar to sea water (between 70-100 m asl). Planktic foraminifers indicate a late Miocene age between 8.10 and 5.3 Ma for the oldest part of the Bouse Formation in the southern part of the Blythe Basin. Benthic and planktic foraminifers correlate with other late Miocene sections and suggest that the basal Bouse Formation in the Blythe Basin was deposited at the northern end of the proto-Gulf of California. After the marine connection was restricted or eliminated, the Colorado River flowed into the Blythe Basin forming a saline lake. This lake supported a monospecific foraminiferal assemblage of A. beccarii until the lake spilled into the Salton Trough and the Colorado River became a through-flowing river.

  11. Fish assemblages of the Casiquiare River, a corridor and zoogeographical filter for dispersal between the Orinoco and Amazon basins

    Science.gov (United States)

    Winemiller, K.O.; Lopez-Fernandez, H.; Taphorn, D.C.; Nico, L.G.; Duque, A.B.

    2008-01-01

    Aim: The aim of this study was to determine whether the Casiquiare River functions as a free dispersal corridor or as a partial barrier (i.e. filter) for the interchange of fish species of the Orinoco and Negro/Amazon basins using species assemblage patterns according to geographical location and environmental features. Location: The Casiquiare, Upper Orinoco and Upper Negro rivers in southern Venezuela, South America. Methods: Our study was based on an analysis of species presence/absence data and environmental information (11 habitat characteristics) collected by the authors and colleagues between the years 1984 and 1999. The data set consisted of 269 sampled sites and 452 fish species (> 50,000 specimens). A wide range of habitat types was included in the samples, and the collection sites were located at various points along the entire length of the Casiquiare main channel, at multiple sites on its tributary streams, as well as at various nearby sites outside the Casiquiare drainage, within the Upper Orinoco and Upper Rio Negro river systems. Most specimens and field data used in this analysis are archived in the Museo de Ciencias Naturales in Guanare, Venezuela. We performed canonical correspondence analysis (CCA) based on species presence/absence using two versions of the data set: one that eliminated sites having < 5 species and species occurring at < 5 sites; and another that eliminated sites having < 10 species and species occurring at < 10 sites. Cluster analysis was performed on sites based on species assemblage similarity, and a separate analysis was performed on species based on CCA loadings. Results: The CCA results for the two versions of the data set were qualitatively the same. The dominant environmental axis contrasted assemblages and sites associated with blackwater vs. clearwater conditions. Longitudinal position on the Casiquiare River was correlated (r2 = 0.33) with CCA axis-1 scores, reflecting clearwater conditions nearer to its origin

  12. GIS-based terrain analysis of linear infrastructure corridors in the Mackenzie River Valley, NWT

    International Nuclear Information System (INIS)

    Ednie, M.; Wright, J.F.; Duchesne, C.

    2007-01-01

    The impact of global warming on permafrost terrain was discussed with particular reference to the structural stability and performance reliability of the proposed pipelines and roads in the Mackenzie River Valley in the Northwest Territories. Engineers, regulators and decision makers responsible for the development of these networks must have access to information about current and future terrain conditions, both local and regional. The Geological Survey of Canada is developing an ArcGIS resident, multi-component terrain analysis methodology for evaluating permafrost terrain in terms of the probable geothermal and geomorphological responses to climate warming. A GIS-integrated finite-element transient ground thermal model (T-ONE) can predict local-regional permafrost conditions and future responses of permafrost to climate warming. The influences of surface and channel hydrology on local erosion potentials can be determined by analyzing the topographic and topologic characteristics of the terrain. A weights of evidence-based landscape-process model, currently under development, will consider multiple terrain factors for mapping terrain that is susceptible to slope failure, subsidence or erosion. This terrain analysis methodology is currently being applied to a 2 km buffer spanning the proposed Mackenzie Gas Pipeline right-of-way, and along winter and all-weather road networks in the Mackenzie River Valley. Initial ground thermal modeling has identified thermally sensitive terrain for which permafrost will either completely disappear or warm significantly to near isothermal conditions within the next 25 to 55 years

  13. Clinch River breeder project gets boost

    International Nuclear Information System (INIS)

    Hill, W.H.

    1982-01-01

    Progress on the Clinch River Breeder Reactor Plant project, the United States' next step in developing liquid metal fast breeder technology is examined including consideration of Plant design, component fabrication and testing, construction schedule, funding, fuel cycle development and licensing. (U.K.)

  14. Songbird use of floodplain and upland forests along the Upper Mississippi River corridor during spring migration

    Science.gov (United States)

    Kirsch, Eileen M.; Heglund, Patricia J.; Gray, Brian R.; Mckann, Patrick

    2013-01-01

    The Upper Mississippi River is thought to provide important stopover habitat for migrating landbirds because of its north-south orientation and floodplain forests. The river flows through the Driftless Area of southwestern Wisconsin and southeastern Minnesota where forests are plentiful, yet forests of the floodplain and Driftless Area uplands differ greatly in landscape setting, tree species composition, and topography. We compared landbird assemblages in these upland and floodplain forests over three springs, 2005–2007, using line-transect surveys at randomly selected areas in and within 16 km of the floodplain. We found more species of both transient and locally breeding migrants per survey in floodplain than in upland forest. Detections of transient neotropical migrants did not differ statistically by habitat. Detections of locally breeding neotropical and temperate-zone migrants and transient temperate-zone migrants were greater in floodplain than in upland forest. Between floodplain and upland forest, assemblages of locally breeding species, including neotropical and temperate-zone migrants (of which some individuals were in transit), differed substantially, but assemblages of transients (including both neotropical and temperate-zone migrants) did not differ as much. Only two species of transient migrants had clear affinities for floodplain forest, and none had an affinity for upland forest, whereas most locally breeding migrants had an affinity for either upland or floodplain forest. Within each spring, however, detections of transient neotropical migrants shifted from being greater in floodplain to greater in upland forests. This intraseasonal shift may be related to the phenology of certain tree species.

  15. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  16. Floods affect the abundance of invasive Impatiens glandulifera and its spread from river corridors

    Czech Academy of Sciences Publication Activity Database

    Čuda, Jan; Rumlerová, Zuzana; Brůna, Josef; Skálová, Hana; Pyšek, Petr

    2017-01-01

    Roč. 23, č. 4 (2017), s. 342-354 ISSN 1366-9516 R&D Projects: GA ČR GB14-36079G Grant - others:AV ČR(CZ) AP1002 Institutional support: RVO:67985939 Keywords : flood * disturbance * niche broadening * residence time * riverbank * Himalayan balsam Subject RIV: EH - Ecology, Behaviour OBOR OECD: Ecology Impact factor: 4.391, year: 2016

  17. Building on the Orange river project

    International Nuclear Information System (INIS)

    Skinner, J.

    1999-01-01

    The life of the World Commission on Dams (WCD) is due to end in mid-2000. In order to achieve its objective of making recommendations on the environmental, social, economic and institutional questions on dams, it will conduct up to ten case studies where the dams and river basins have been selected according to their age, function, regional representation and the lessons to be learned. The Orange River project in South Africa is being used as a pilot study for the other case studies and the reactions to the study are discussed. The case studies will focus on planning, implementation and operation of the dams with respect to their river basins. Six questions are listed and these will need to be answered to form a basis for a structured approach. To date, stakeholder meetings and fieldwork have highlighted four common generic difficulties and these are listed. A form for completion by interested parties was included with the article. (UK)

  18. Projected future runoff of the Breede River under climate change ...

    African Journals Online (AJOL)

    The Breede River is the largest river in the Western Cape Province of South Africa, and as such, is a key resource for a variety of activities within the region. It is this significance of the river that prompted a study into the impact of climate change on future runoff in the river and hence, the potential impacts a projected change ...

  19. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions

  20. Effects of Green River Project on Cassava Farmers Production in ...

    African Journals Online (AJOL)

    This paper examined the effects of Green River project on cassava farmers' production in Ogba/Egbema/ Ndoni LGA of Rivers State. Purposive and stratified random sampling techniques were used to select the locations of Green River project, cooperative societies and respondents. Using structured questionnaire, a field ...

  1. Green corridors in freight logistics

    DEFF Research Database (Denmark)

    Panagakos, George

    of the performance of a green corridor in terms of pre-specified Key Performance Indicators (KPIs). The thesis builds on previous own work under the EUfinanced SuperGreen project and applies the new methodology on the GreCOR corridor extending from Oslo to Rotterdam. The scope of the two other objectives relates...... the rationale for a performance monitoring scheme has been established, the thesis critically reviews the SuperGreen methodology which consists of: (i) decomposing the corridor into transport chains, (ii) selecting a sample of typical chains, (iii) assessing these chains through a set of KPIs, and (iv......) aggregating the chain-level KPIs to corridor-level ones using proper weights. Unlike SuperGreen that suggests a study-based approach for constructing the corridor sample, the thesis proposes founding the selection of typical chains on the outcome of specialised transport models. The periodic collection...

  2. The role of river hydrology on Salix shoot and root survival statistics on the alluvial sediment of a restored river corridor

    Science.gov (United States)

    Pasquale, Nicola; Perona, Paolo; Verones, Francesca; Francis, Robert; Burlando, Paolo

    2010-05-01

    In river restoration projects there is considerable interest in understanding the morphodynamics of river reaches in relation to the characteristics of vegetation that may colonize the bare alluvial sediment, and locally stabilize it by root anchoring. Vegetation interacts with river hydrology on multiple time scales, but such interactions are at present still poorly understood. In this contribution, we discuss both the above and below ground biomass growth dynamics of 1188 Salix cuttings (individual and group survival rate, growth of the longest shoots and number of branches and morphological root analysis) in relation to local river hydrodynamics. Cuttings were organized in square plots of different size and planted in spring 2009 on a gravel island of the restored river section of River Thur (Niederneunforn, Canton Thurgau, Switzerland). Cuttings in the plots were monitored regularly, from the beginning of the campaign (March) until the end of the growing season (October). We obtained a detailed and quite unique set of data, which includes, among others, root characteristic statistics obtained from image and high-resolution scanner analysis of carefully uprooted samples. Beyond describing the survival rate dynamics in relation to river hydrology, we show the nature and strength of correlations between island topography, cutting growth statistics and local reach morphodynamics (see also Pasquale et. al.3, session HS 3.1). In particular, by comparing empirical histograms of the vertical root distribution vs. those of the saturated water surface in the sediment, we show that main tropic responses are oxytropism, hydrotropism and thigmotropism. Moreover, by numerical modelling of the local hydrodynamics, we can also identify the spatial distribution of preferential locations of oxytropism and hydrotropism. As far as factors causing mortality are concerned, we also show that erosion by flood is responsible for influencing the spatial and temporal distribution of the

  3. El corredor fluvial del Mapocho como recurso multifacético de Santiago: avances y retrocesos en las concepciones y acciones de un siglo./ The corridor of the Mapocho River as a Opportunity to Santiago: a century of progress and setbacks in its projects.

    Directory of Open Access Journals (Sweden)

    María Isabel Pávez Reyes

    2008-06-01

    Full Text Available Se revisa en términos generales los avances y retrocesos en las concepciones y acciones sobre el río Mapocho, durante el siglo XX y comienzos del siglo XXI, en la perspectiva de considerar el corredor fluvial como un recurso estructurante mayor y multifacético de la Región Metropolitana de Santiago de Chile./ This article reviews the history of the plans for the Mapocho river in the last century. The process varies between making of it a structural element in the planning of the Region Metropolitana or don't.

  4. 76 FR 63346 - Environmental Impact Statement, Tappan Zee Bridge/I-287 Corridor Project (Rockland and...

    Science.gov (United States)

    2011-10-12

    ... review and the State project manager. Because of the current economic realities which severely limit... and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental...

  5. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  6. Modern landscape processes affecting archaeological sites along the Colorado River corridor downstream of Glen Canyon Dam, Glen Canyon National Recreation Area, Arizona

    Science.gov (United States)

    East, Amy E.; Sankey, Joel B.; Fairley, Helen C.; Caster, Joshua J.; Kasprak, Alan

    2017-08-29

    The landscape of the Colorado River through Glen Canyon National Recreation Area formed over many thousands of years and was modified substantially after the completion of Glen Canyon Dam in 1963. Changes to river flow, sediment supply, channel base level, lateral extent of sedimentary terraces, and vegetation in the post-dam era have modified the river-corridor landscape and have altered the effects of geologic processes that continue to shape the landscape and its cultural resources. The Glen Canyon reach of the Colorado River downstream of Glen Canyon Dam hosts many archaeological sites that are prone to erosion in this changing landscape. This study uses field evaluations from 2016 and aerial photographs from 1952, 1973, 1984, and 1996 to characterize changes in potential windblown sand supply and drainage configuration that have occurred over more than six decades at 54 archaeological sites in Glen Canyon and uppermost Marble Canyon. To assess landscape change at these sites, we use two complementary geomorphic classification systems. The first evaluates the potential for aeolian (windblown) transport of river-derived sand from the active river channel to higher elevation archaeological sites. The second identifies whether rills, gullies, or arroyos (that is, overland drainages that erode the ground surface) exist at the archaeological sites as well as the geomorphic surface, and therefore the relative base level, to which those flow paths drain. Results of these assessments are intended to aid in the management of irreplaceable archaeological resources by the National Park Service and stakeholders of the Glen Canyon Dam Adaptive Management Program.

  7. 河西走廊流域治理的科学问题及其思考%The key problems and challenges on the river basin governance in the Hexi Corridor, Gansu, China

    Institute of Scientific and Technical Information of China (English)

    王忠静; 郑航; 耿国婷

    2011-01-01

    针对河西走廊三流域治理,从水资源承载能力、社会经济发展模式、水资源利用秩序等方面,剖析各流域产生生态问题的科学必然性,以及流域治理手段的针对性.从黑河、石羊河流域治理的效果及流域演化基本规律出发,提出河西走廊三流域后治理时代可持续发展在气候变化、经济转型和粮食安全等方面的科学思考.%The inevitability of the occurrence of ecological issues and targets of the governance of the Three River Basins in the Hexi Corridor (the Corridor West of the Yellow River) were analyzed in terms of water resources carrying capacity, socio-economic development patterns and the order of water resources use. Based on both the effects of governing the Heihe River and the Shiyang River Basin and on the basic rules of river evolution, the key problems and challenges on the sustainable development during the post-management period of the Three River Basins in the Hexi Corridor were proposed in terms of climate change, economic transition and food safety.

  8. 76 FR 22668 - Shasta-Trinity National Forest; California; I-5 Corridor Fuels Reduction Project

    Science.gov (United States)

    2011-04-22

    ... environmental impact statement. SUMMARY: The Shasta Unit of the Shasta-Trinity National Forest is proposing a hazardous fuels treatment project to reduce the risk of life, property and resource values from a high... 20,025 acres of the project area is proposed for treatment. Treatment methods include prescribe fire...

  9. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  10. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  11. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  12. Winter road access to projected works in the diversion of the Little Whale River

    International Nuclear Information System (INIS)

    Goulet, R.

    1993-01-01

    The Great Whale hydroelectric complex in northern Quebec will require diversion of the Little Whale River, involving construction of dams 40 m and 30 m high and a canal 600 m long. The main mode of access to the construction sites will be a winter road, supplemented by an airfield designed for large-capacity aircraft. The method used by Hydro-Quebec in its environmental assessment of the winter road project is described. This method comprises five steps: delimitation of the study zone; establishment of a road corridor of choice by successively eliminating territory according to given constraints; description of the physical and biological environment; determination and optimization of the road route; and evaluation of potential impacts, along with establishment of measures to mitigate those impacts. The optimal routing is determined on the basis of criteria such as the presence of permafrost, the nature of the soils, avoidance of slopes steeper than 10%, and the depth and width of ice crossings

  13. Hood River Conservation Project load analysis

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, T.K.

    1987-11-01

    As a part of the Hood River Conservation Project (HRCP), 314 homes were monitored to measure electrical energy use. The total electrical load, space heating load, water heating load (in about 200 homes), wood-stove heat output (in about 100 homes), and indoor temperature were monitored. Data were collected for one full year before and one full year after these homes were retrofit with conservation measures. Local weather information was also collected on a 15-min basis. This data base was used to evaluate the load savings attributable to HRCP. Two methods of weather normalization were used and showed close agreement. The weather-normalized diversified residential load savings on the Pacific Power and Light system and Hood River area peak days were >0.5 kW/household. The average spring, summer, and fall savings were much smaller, <0.1 kW/household. The load factor for the diversified residential load decreased following the conservation retrofit actions. 11 refs., 40 figs., 13 tabs.

  14. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  15. An integrated management tool for rockfall evaluation along transportation corridors: the ParaChute research project

    Science.gov (United States)

    Cloutier, Catherine; Locat, Jacques; Mayers, Mélanie; Noël, François; Turmel, Dominique; Jacob, Chantal; Dorval, Pierre; Bossé, François; Gionet, Pierre; Jaboyedoff, Michel

    2016-04-01

    Rockfall is a significant hazard along linear infrastructures due to the presence of natural and man-made rock slopes. Knowing where the problematic rockfalls source areas are is of primary importance to properly manage and mitigate the risk associated to rockfall along linear infrastructures. The aim of the ParaChute research project is to integrate various technologies into a workflow for rockfall characterization for such infrastructures, using a 220 km-long railroad as the study site which is located on Québec's North Shore, Canada. The objectives of this 3-year project which started in 2014 are: (1) to optimize the use of terrestrial, mobile and airborne laser scanners data into terrain analysis, structural geology analysis and rockfall susceptibility rating, (2) to further develop the use of unmanned aerial vehicles (UAV) for photogrammetry applied to rock cliff characterization, and (3) to integrate rockfall simulation studies into a rock slope classification system similar to the Rockfall Hazard Rating System. Firstly, based on laser scanner data and aerial photographs, the morpho-structural features of the terrain (genetic material, landform, drainage, etc.) are mapped. The result can be used to assess all types of mass movements. Secondly, to guide field work and decrease uncertainty of various parameters, systematic rockfall simulations and a first structural analysis are made from point clouds acquired by mobile and airborne laser scanner. The simulation results are used to recognize the rock slopes that have potentially problematic rockfall paths, meaning they could reach the linear infrastructure. Other rock slopes are not included in the inventory. Field work is carried out to validate and complete the rock slopes characterization previously made from remote sensing technique. Because some or parts of cliffs are not visible or accessible from the railroad, we are currently developing the use of photogrammetry by UAV in order to complete the

  16. The Influence of Water Conservancy Projects on River Network Connectivity, A Case of Luanhe River Basin

    Science.gov (United States)

    Li, Z.; Li, C.

    2017-12-01

    Connectivity is one of the most important characteristics of a river, which is derived from the natural water cycle and determine the renewability of river water. The water conservancy project can change the connectivity of natural river networks, and directly threaten the health and stability of the river ecosystem. Based on the method of Dendritic Connectivity Index (DCI), the impacts from sluices and dams on the connectivity of river network are deeply discussed herein. DCI quantitatively evaluate the connectivity of river networks based on the number of water conservancy facilities, the connectivity of fish and geographical location. The results show that the number of water conservancy facilities and their location in the river basin have a great influence on the connectivity of the river network. With the increase of the number of sluices and dams, DCI is decreasing gradually, but its decreasing range is becoming smaller and smaller. The dam located in the middle of the river network cuts the upper and lower parts of the whole river network, and destroys the connectivity of the river network more seriously. Therefore, this method can be widely applied to the comparison of different alternatives during planning of river basins and then provide a reference for the site selection and design of the water conservancy project and facility concerned.

  17. A critical review of field techniques employed in the survey of large woody debris in river corridors: a central European perspective.

    Science.gov (United States)

    Máčka, Zdeněk; Krejčí, Lukáš; Loučková, Blanka; Peterková, Lucie

    2011-10-01

    In forested watersheds, large woody debris (LWD) is an integral component of river channels and floodplains. Fallen trees have a significant impact on physical and ecological processes in fluvial ecosystems. An enormous body of literature concerning LWD in river corridors is currently available. However, synthesis and statistical treatment of the published data are hampered by the heterogeneity of methodological approaches. Likewise, the precision and accuracy of data arising out of published surveys have yet to be assessed. For this review, a literature scrutiny of 100 randomly selected research papers was made to examine the most frequently surveyed LWD variables and field procedures. Some 29 variables arose for individual LWD pieces, and 15 variables for wood accumulations. The literature survey revealed a large variability in field procedures for LWD surveys. In many studies (32), description of field procedure proved less than adequate, rendering the results impossible to reproduce in comparable fashion by other researchers. This contribution identifies the main methodological problems and sources of error associated with the mapping and measurement of the most frequently surveyed variables of LWD, both as individual pieces and in accumulations. The discussion stems from our own field experience with LWD survey in river systems of various geomorphic styles and types of riparian vegetation in the Czech Republic in the 2004-10 period. We modelled variability in terms of LWD number, volume, and biomass for three geomorphologically contrasting river systems. The results appeared to be sensitive, in the main, to sampling strategy and prevailing field conditions; less variability was produced by errors of measurement. Finally, we propose a comprehensive standard field procedure for LWD surveyors, including a total of 20 variables describing spatial position, structural characteristics and the functions and dynamics of LWD. However, resources are only rarely

  18. LCREP genetic stock ID - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  19. LCREP catch records - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  20. LCREP prey data - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  1. LCREP chemistry and lipids - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  2. Napa River Sediment TMDL Implementation and Habitat Enhancement Project

    Science.gov (United States)

    Information about the SFBWQP Napa River Sediment TMDL Implementation and Habitat Enhancement Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  3. LCREP growth rates - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  4. Skagit IMW - Skagit River Estuary Intensively Monitored Watershed Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study evaluates system-level effects of several estuary restoration projects on juvenile Chinook salmon production in the Skagit River estuary. The monitoring...

  5. Gully annealing by aeolian sediment: field and remote-sensing investigation of aeolian-hillslope-fluvial interactions, Colorado River corridor, Arizona, USA

    Science.gov (United States)

    Sankey, Joel B.; Draut, Amy E.

    2014-01-01

    Processes contributing to development of ephemeral gully channels are of great importance to landscapes worldwide, and particularly in dryland regions where soil loss and land degradation from gully erosion pose long-term land-management problems. Whereas gully formation has been relatively well studied, much less is known of the processes that anneal gullies and impede their growth. This study of gully annealing by aeolian sediment, spanning 95 km along the Colorado River corridor in Glen, Marble, and Grand Canyon, Arizona, USA, employed field and remote sensing observations, including digital topographic modelling. Results indicate that aeolian sediment activity can be locally effective at counteracting gully erosion. Gullies are less prevalent in areas where surficial sediment undergoes active aeolian transport, and have a greater tendency to terminate in active aeolian sand. Although not common, examples exist in the record of historical imagery of gullies that underwent infilling by aeolian sediment in past decades and evidently were effectively annealed. We thus provide new evidence for a potentially important interaction of aeolian–hillslope–fluvial processes, which could affect dryland regions substantially in ways not widely recognized. Moreover, because the biologic soil crust plays an important role in determining aeolian sand activity, and so in turn the extent of gully development, this study highlights a critical role of geomorphic–ecologic interactions in determining arid-landscape evolution.

  6. North-South Corridor Demonstration Project: Ethical and Logistical Challenges in the Design of a Demonstration Study of Early Antiretroviral Treatment for Long Distance Truck Drivers along a Transport Corridor through South Africa, Zimbabwe, and Zambia

    Directory of Open Access Journals (Sweden)

    G. B. Gomez

    2013-01-01

    Full Text Available Background. Long-distance truck drivers are at risk of acquiring and transmitting HIV and have suboptimal access to care. New HIV prevention strategies using antiretroviral drugs to reduce transmission risk (early antiretroviral therapy (ART at CD4 count >350 cells/μL have shown efficacy in clinical trials. Demonstration projects are needed to evaluate “real world” programme effectiveness. We present the protocol for a demonstration study to evaluate the feasibility, acceptability, and cost of an early ART intervention for HIV-positive truck drivers along a transport corridor across South Africa, Zimbabwe, and Zambia, as part of an enhanced strategy to improve treatment adherence and retention in care. Methods and Analysis. This demonstration study would follow an observational cohort of truck drivers receiving early treatment. Our mixed methods approach includes quantitative, qualitative, and economic analyses. Key ethical and logistical issues are discussed (i.e., choice of drug regimen, recruitment of participants, and monitoring of adherence, behavioural changes, and adverse events. Conclusion. Questions specific to the design of tailored early ART programmes are amenable to operational research approaches but present substantial ethical and logistical challenges. Addressing these in demonstration projects can inform policy decisions regarding strategies to reduce health inequalities in access to HIV prevention and treatment programmes.

  7. Energy corridors European Union and Neighbouring countries

    International Nuclear Information System (INIS)

    Van Oostvoorn, F.; Hafner, Manfred; Vailati, Ricardo; Wietschel, Martin

    2007-08-01

    The ENCOURAGED (Energy corridor optimisation for European markets of gas, electricity and hydrogen) project has been launched in beginning 2005 to identify and assess the economically optimal energy corridors between European Union (EU) and neighbouring countries. The objectives of the project are to: Assess the economic optimal energy (electricity, gas and hydrogen) corridors and related network infrastructure for connecting the EU with its neighbouring countries and regions; Identify, quantify and evaluate the barriers to and potential benefits of building optimal energy corridors connecting the EU with its neighbours; Propose necessary policy measures to implement the recommended energy corridors with a focus on investment and the geopolitical framework; Organise stakeholder workshops and seminars to discuss the results and findings and reach consensus among scientists, stakeholders and non-governmental organizations and validate project results

  8. Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1993-10-01

    Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

  9. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  10. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  11. Airborne digital-image data for monitoring the Colorado River corridor below Glen Canyon Dam, Arizona, 2009 - Image-mosaic production and comparison with 2002 and 2005 image mosaics

    Science.gov (United States)

    Davis, Philip A.

    2012-01-01

    Airborne digital-image data were collected for the Arizona part of the Colorado River ecosystem below Glen Canyon Dam in 2009. These four-band image data are similar in wavelength band (blue, green, red, and near infrared) and spatial resolution (20 centimeters) to image collections of the river corridor in 2002 and 2005. These periodic image collections are used by the Grand Canyon Monitoring and Research Center (GCMRC) of the U.S. Geological Survey to monitor the effects of Glen Canyon Dam operations on the downstream ecosystem. The 2009 collection used the latest model of the Leica ADS40 airborne digital sensor (the SH52), which uses a single optic for all four bands and collects and stores band radiance in 12-bits, unlike the image sensors that GCMRC used in 2002 and 2005. This study examined the performance of the SH52 sensor, on the basis of the collected image data, and determined that the SH52 sensor provided superior data relative to the previously employed sensors (that is, an early ADS40 model and Zeiss Imaging's Digital Mapping Camera) in terms of band-image registration, dynamic range, saturation, linearity to ground reflectance, and noise level. The 2009 image data were provided as orthorectified segments of each flightline to constrain the size of the image files; each river segment was covered by 5 to 6 overlapping, linear flightlines. Most flightline images for each river segment had some surface-smear defects and some river segments had cloud shadows, but these two conditions did not generally coincide in the majority of the overlapping flightlines for a particular river segment. Therefore, the final image mosaic for the 450-kilometer (km)-long river corridor required careful selection and editing of numerous flightline segments (a total of 513 segments, each 3.2 km long) to minimize surface defects and cloud shadows. The final image mosaic has a total of only 3 km of surface defects. The final image mosaic for the western end of the corridor has

  12. Lower Red River Meadow Restoration Project : Biennial Report 1996-97.

    Energy Technology Data Exchange (ETDEWEB)

    LRK Communications; Wildlife Habitat Institute; Pocket Water, Inc.

    2003-07-01

    The Red River has been straightened and the riparian vegetation corridor eliminated in several reaches within the watershed. The river responded by incision resulting in over-steepened banks, increased sedimentation, elevated water temperatures, depressed groundwater levels, reduced floodplain function, and degraded fish habitat. The Lower Red River Meadow Restoration Project is a multi-phase ecosystem enhancement effort that restores natural physical and biological processes and functions to stabilize the stream channel and establish high quality habitats for fish and wildlife. A natural channel restoration philosophy guides the design and on the ground activities, allowing the channel to evolve into a state of dynamic equilibrium. Two years of planning, two years of restoration in Phases I and II, and one year post-restoration monitoring are complete. By excavating new bends and reconnecting historic meanders, Phase I and II channel realignment increased channel length by 3,060 feet, decreased channel gradient by 25 percent, and increased sinuosity from 1.7 to 2.3. Cross-sectional shapes and point bars were modified to maintain deep pool habitat at low flow and to reconnect the meadow floodplain. Improved soil moisture conditions will help sustain the 31,500 native riparian plantings reestablished within these two phases. Overall, short-term restoration performance was successful. Analyses of long-term parameters document either post-restoration baseline conditions or early stages of evolution toward desired conditions. An adaptive management strategy has helped to improve restoration designs, methods, and monitoring. Lessons learned are being transferred to a variety of audiences to advance the knowledge of ecological restoration and wise management of watersheds.

  13. Combining integrated river modelling and agent based social simulation for river management; The case study of the Grensmaas project

    NARCIS (Netherlands)

    Valkering, P.; Krywkow, Jorg; Rotmans, J.; van der Veen, A.; Douben, N.; van Os, A.G.

    2003-01-01

    In this paper we present a coupled Integrated River Model – Agent Based Social Simulation model (IRM-ABSS) for river management. The models represent the case of the ongoing river engineering project “Grensmaas”. In the ABSS model stakeholders are represented as computer agents negotiating a river

  14. Modifications to River Protection Project (RPP) Level -0 Logic

    International Nuclear Information System (INIS)

    SEEMAN, S.E.

    2000-01-01

    The following modifications were made to the River Protection Project Level-0 logic in going from Rev. I to Rev. 2. The first change was the change to the heading at the top of the drawing: ''TWRS Program Logic'' to ''River Protection Project Mission Logic''. Note that purely format changes (e.g., fonts, location of boxes, date format, addition of numbers to ''ghost'' boxes) are not discussed. However, the major format change was to show DOE-BNFL Inc. Interface Control Documents (ICDs) on the logic

  15. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  16. Hydropower in Hawaii: Developing the Wailuku River project

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    When the 10-MW Wailuku River Hydroelectric Project begins operating this summer, the island of Hawaii will reduce its dependence on oil. The project is illustrative of what must be done to add to the electricity supply and, at the same time, to protect the environment. The Wailuku project is the first hydro plant to be developed in Hawaii in more than 50 years and is the largest hydro facility ever built in the state. The project is being developed by Wailuku River Hydroelectric Power Co., a wholly owned subsidiary of Synergics, Inc. Hawaii Electric Light Company Inc. (HELCO) will buy the electricity generated at the project for 30 years on an as-delivered basis at its avoided cost rate, now approximately 6.71 cents per kilowatt-hour, the floor rate in the contract. The Wailuku endeavor receives rave reviews form the mayor of Hilo, the president of the utility, and local residents. The project demanded a high degree of sensitivity to environmental issues and the uniqueness of the Hawaiian culture and island setting, according to Wayne Rogers, president of Wailuku River Hydro. From the conception of this project, we have worked closely with state and local interests and have been committed to following Hawaii's plans for land use and environmentally responsible energy development

  17. Bipole III transmission line Henday-Riel: Alternative corridors status report

    International Nuclear Information System (INIS)

    1991-01-01

    As part of expansion plans in the Manitoba Hydro system, it is proposed to build a 850-km high voltage dc transmission line from the Henday converter station on the Nelson River to a new converter station near Winnipeg. A review is provided of work done on the first stage of route selection and environmental assessment for this project. Right-of-way requirements are outlined and environmental impact issues are discussed in the areas of employment and business opportunities, effects on wilderness areas and aesthetics, electric and magnetic field effects, and land use. The four zones, east and west of Lake Winnipeg, that were studied in the selection of potential corridors are described along with the corridor siting criteria. Five discrete corridor alternatives are identified and evaluated. A route east of Lake Winnipeg has been selected as the preferred corridor. Feedback from public consultations will assist in preparation of a final corridor selection study which is to be submitted to federal and provincial environmental review. 12 figs

  18. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  19. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  20. Climate Projections and Drought: Verification for the Colorado River Basin

    Science.gov (United States)

    Santos, N. I.; Piechota, T. C.; Miller, W. P.; Ahmad, S.

    2017-12-01

    The Colorado River Basin has experienced the driest 17 year period (2000-2016) in over 100 years of historical record keeping. While the Colorado River reservoir system began the current drought at near 100% capacity, reservoir storage has fallen to just above 50% during the drought. Even though federal and state water agencies have worked together to mitigate the impact of the drought and have collaboratively sponsored conservation programs and drought contingency plans, the 17-years of observed data beg the question as to whether the most recent climate projections would have been able to project the current drought's severity. The objective of this study is to analyze observations and ensemble projections (e.g. temperature, precipitation, streamflow) from the CMIP3 and CMIP5 archive in the Colorado River Basin and compare metrics related to skill scores, the Palmer Drought Severity Index, and water supply sustainability index. Furthermore, a sub-ensemble of CMIP3/CMIP5 projections, developed using a teleconnection replication verification technique developed by the author, will also be compared to the observed record to assist in further validating the technique as a usable process to increase skill in climatological projections. In the end, this study will assist to better inform water resource managers about the ability of climate ensembles to project hydroclimatic variability and the appearance of decadal drought periods.

  1. Hanford Cleanup... Restore the Columbia River Corridor Transition the Central Plateau Prepare and Plan for the End State

    International Nuclear Information System (INIS)

    Klein, Keith A.

    2006-01-01

    The U.S. Department of Energy's (DOE) Hanford Site in southeastern Washington State was established during World War II to produce plutonium for nuclear weapons as part of the top-secret Manhattan Project. In 1989, Hanford's mission changed to cleanup and closure; today the site is engaged in one of the world's largest and most aggressive programs to clean up radioactive and hazardous wastes. The size and complexity of Hanford's environmental problems are made even more challenging by the overlapping technical, political, regulatory, financial and cultural issues associated with the cleanup. The physical challenges at the Hanford Site are daunting. More than 50 million gallons of liquid radioactive waste in 177 underground storage tanks; 2,300 tons of spent nuclear fuel;12 tons of plutonium in various forms; 25 million cubic feet of buried or stored solid waste; 270 billion gallons of groundwater contaminated above drinking-water standards spread out over about 80 square miles; more than 1,700 waste sites; and approximately 500 contaminated facilities. With a workforce of approximately 7,000 and a budget of about $1.8 billion dollars this fiscal year, Hanford cleanup operations are expected to be complete by 2035, at a cost of $60 billion dollars. (authors)

  2. Relations between rainfall–runoff-induced erosion and aeolian deposition at archaeological sites in a semi-arid dam-controlled river corridor

    Science.gov (United States)

    Collins, Brian D.; Bedford, David; Corbett, Skye C.; Fairley, Helen C.; Cronkite-Ratcliff, Collin

    2016-01-01

    Process dynamics in fluvial-based dryland environments are highly complex with fluvial, aeolian, and alluvial processes all contributing to landscape change. When anthropogenic activities such as dam-building affect fluvial processes, the complexity in local response can be further increased by flood- and sediment-limiting flows. Understanding these complexities is key to predicting landscape behavior in drylands and has important scientific and management implications, including for studies related to paleoclimatology, landscape ecology evolution, and archaeological site context and preservation. Here we use multi-temporal LiDAR surveys, local weather data, and geomorphological observations to identify trends in site change throughout the 446-km-long semi-arid Colorado River corridor in Grand Canyon, Arizona, USA, where archaeological site degradation related to the effects of upstream dam operation is a concern. Using several site case studies, we show the range of landscape responses that might be expected from concomitant occurrence of dam-controlled fluvial sand bar deposition, aeolian sand transport, and rainfall-induced erosion. Empirical rainfall-erosion threshold analyses coupled with a numerical rainfall–runoff–soil erosion model indicate that infiltration-excess overland flow and gullying govern large-scale (centimeter- to decimeter-scale) landscape changes, but that aeolian deposition can in some cases mitigate gully erosion. Whereas threshold analyses identify the normalized rainfall intensity (defined as the ratio of rainfall intensity to hydraulic conductivity) as the primary factor governing hydrologic-driven erosion, assessment of false positives and false negatives in the dataset highlight topographic slope as the next most important parameter governing site response. Analysis of 4+ years of high resolution (four-minute) weather data and 75+ years of low resolution (daily) climate records indicates that dryland erosion is dependent on short

  3. River Protection Project FY 2000 Multi Year Work Plan Summary

    International Nuclear Information System (INIS)

    LENSEIGNE, D.L.

    1999-01-01

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort

  4. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  5. An evaluation of the embankment project on the Pripyat river

    International Nuclear Information System (INIS)

    Lepicard, S.

    2000-01-01

    On considering only the economical and radiological criteria, and on the base of available information and adopted hypothesis, the benefits expected from the building project of an embankment on the Pripyat river lead to just compensate the building and maintenance costs estimated for this project. Nevertheless, taking into account the expected positive effects on different sectors of economy, the project of an embankment of Chernobyl, initiated more than twelve years after the accident, will be, in a long term perspective, an efficient mean to improve the radiations situation and the life conditions for the Ukraine populations. (N.C.)

  6. 77 FR 45653 - Yakima River Basin Conservation Advisory Group; Yakima River Basin Water Enhancement Project...

    Science.gov (United States)

    2012-08-01

    ... Basin Conservation Advisory Group, Yakima River Basin Water Enhancement Project, established by the... Water Conservation Program. DATES: The meeting will be held on Tuesday, August 21, 2012, from 1 p.m. to... the implementation of the Water Conservation Program, including the applicable water conservation...

  7. VT Electric Transmission Line Corridors - corridor lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  8. Alligator Rivers Analogue project. Geochemical Data Bases

    International Nuclear Information System (INIS)

    Bennett, D.G.; Read, D.

    1992-01-01

    The Koongarra uranium deposit in the Northern Territory of Australia is being studied to evaluate the processes involved in the geochemical alteration of the ore body and the formation of the uranium dispersion fan. A broad range of research is being undertaken into the geochemistry and hydrology of the site with the aim of understanding the transport of radionuclides through the system. During the project a range of geochemical and hydrogeochemical models have been developed to account for measured data from the site and with which to predict site evolution. The majority of these models are based on the premise of thermodynamic chemical equilibrium and employ fundamental thermodynamic data to characterise the chemistry of the system. From the differences which exist between the thermodynamic data bases (Appendices I and II) it is possible to gain a view of the level of uncertainty associated with thermodynamic data in each set of calculations. This report gives a brief introduction to the geochemical processes underlying the models, and details the equations used to quantify the more common of these processes (e.g. aqueous speciation and mineral solubility). A description is given of the computer codes (EQ3/6, PHREEQE, MINTEQ) most commonly used during the project for geochemical modelling. Their key features are highlighted and comparisons made. It is concluded that the degree of uncertainty in geochemical modelling studies arising as a result of using one code rather than another is relatively insignificant when compared to that related to differences in the underlying data bases. 73 refs., 3 figs

  9. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  10. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  11. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  12. Implementation of advanced LCNG fueling infrastructure in Texas along the I-35/NAFTA Clean Corridor Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Stan; Hightower, Jared; Knight, Koby

    2001-05-01

    This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.

  13. Project SHARE Sustainable Hydropower in Alpine Rivers Ecosystems

    Science.gov (United States)

    Mammoliti Mochet, Andrea

    2010-05-01

    SHARE - Sustainable Hydropower in Alpine Rivers Ecosystems is a running project early approved and co funded by the European regional development fund in the context of the European Territorial Cooperation Alpine Space programme 2007 - 2013: the project is formally ongoing from August 2009 and it will end July 2012. Hydropower is the most important renewable resource for electricity production in alpine areas: it has advantages for the global CO2 balance but creates serious environmental impacts. RES-e Directives require renewable electricity enhance but, at the same time, the Water Framework Directive obliges member States to reach or maintain a water bodies "good" ecological status, intrinsically limiting the hydropower exploitation. Administrators daily face an increasing demand of water abstraction but lack reliable tools to rigorously evaluate their effects on mountain rivers and the social and economical outputs on longer time scale. The project intends to develop, test and promote a decision support system to merge on an unprejudiced base, river ecosystems and hydropower requirements. This approach will be led using existing scientific tools, adjustable to transnational, national and local normative and carried on by permanent panel of administrators and stakeholders. Scientific knowledge related to HP & river management will be "translated" by the communication tools and spent as a concrete added value to build a decision support system. In particular, the Multicriteria Analysis (MCA) will be applied to assess different management alternatives where a single-criterion approach (such as cost-benefit analysis) falls short, especially where environmental, technical, economic and social criteria can't be quantified by monetary values. All the existing monitoring databases will be used and harmonized with new information collected during the Pilot case studies. At the same time, all information collected will be available to end users and actors of related

  14. The Role of Anthropogenic Stratigraphy in River Restoration Projects

    Science.gov (United States)

    Evans, J. E.; Webb, L. D.

    2012-12-01

    As part of a river restoration project and removal of a low-head dam on the Ottawa River (northwestern Ohio and southeastern Michigan) in 2007, a longer-term project was initiated to assess anthropogenic changes of the Ottawa River fluvial system. A composite stratigraphic section 4.5 m in length was constructed by stratigraphic correlation from three trenches up to 2.5 m in depth and 14 vibracores up to 2.5 m in length, all within a small region (tires, intact or pieces of glass bottles, and one horizon of displaced railroad ties. Age control for the composite section is provided by 4 14C dates, 6 OSL dates, and one bottle with a date stamp. Two prominent flood horizons are indicated in multiple trenches or cores, and identified as the historic floods of 1913 and 1959. The data show the following major changes in the fluvial system over time: (1) prior to approximately 5 Ka, the river system was transporting mineral-rich sediment and formed meandering point-bar sequences approximately 1.5 m thick; (2) between approximately 5 Ka and 200 YBP, the river system was transporting organic-rich sediment (i.e., blackwater stream) bordered by riparian wetlands accumulating peat (part of the regional "Great Black Swamp" discovered by settlers from eastern North America); (3) between approximately 200 YBP and the early 1960s the river system was transporting mineral-rich sediment (i.e., brownwater stream), probably sourced from extensive land clearance for agriculture, which backfilled and overtopped the previous riparian wetlands and produced an series of thin channel fills interpreted as rapidly shifting avulsional channels; (4) since the early 1960s, sediment supply has exceeded sediment conveyance capacity, leading to vertical aggradation of approximately 1.7 m, creating the fill-terrace morphology evident today; and (5) overlapping with the previous stage, channel incision and lateral channel migration has produced a fluvial system dominated by bank erosion, logjams due

  15. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, Anne

    2007-01-01

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  16. Morphological, hydrological, biogeochemical and ecological changes and challenges in river restoration - the Thur River case study

    Science.gov (United States)

    Schirmer, M.; Luster, J.; Linde, N.; Perona, P.; Mitchell, E. A. D.; Barry, D. A.; Hollender, J.; Cirpka, O. A.; Schneider, P.; Vogt, T.; Radny, D.; Durisch-Kaiser, E.

    2014-06-01

    River restoration can enhance river dynamics, environmental heterogeneity and biodiversity, but the underlying processes governing the dynamic changes need to be understood to ensure that restoration projects meet their goals, and adverse effects are prevented. In particular, we need to comprehend how hydromorphological variability quantitatively relates to ecosystem functioning and services, biodiversity as well as ground- and surface water quality in restored river corridors. This involves (i) physical processes and structural properties, determining erosion and sedimentation, as well as solute and heat transport behavior in surface water and within the subsurface; (ii) biogeochemical processes and characteristics, including the turnover of nutrients and natural water constituents; and (iii) ecological processes and indicators related to biodiversity and ecological functioning. All these aspects are interlinked, requiring an interdisciplinary investigation approach. Here, we present an overview of the recently completed RECORD (REstored CORridor Dynamics) project in which we combined physical, chemical, and biological observations with modeling at a restored river corridor of the perialpine Thur River in Switzerland. Our results show that river restoration, beyond inducing morphologic changes that reshape the river bed and banks, triggered complex spatial patterns of bank infiltration, and affected habitat type, biotic communities and biogeochemical processes. We adopted an interdisciplinary approach of monitoring the continuing changes due to restoration measures to address the following questions: How stable is the morphological variability established by restoration? Does morphological variability guarantee an improvement in biodiversity? How does morphological variability affect biogeochemical transformations in the river corridor? What are some potential adverse effects of river restoration? How is river restoration influenced by catchment-scale hydraulics

  17. A River Model Intercomparison Project in Preparation for SWOT

    Science.gov (United States)

    David, C. H.; Andreadis, K.; Famiglietti, J. S.; Beighley, E.; Boone, A. A.; Yamazaki, D.; Paiva, R. C. D.; Fleischmann, A. S.; Collischonn, W.; Fisher, C. K.; Kim, H.; Biancamaria, S.

    2017-12-01

    The Surface Water and Ocean Topography (SWOT) mission is currently scheduled to launch at the beginning of next decade. SWOT is expected to retrieve unprecedented measurements of water extent, elevation, and slope in the largest terrestrial water bodies. Such potential transformative information motivates the investigation of our ability to ingest the associated data into continental-scale models of terrestrial hydrology. In preparation for the expected SWOT observations, an inter-comparison of continental-scale river models is being performed. This comparison experiment focuses on four of the world's largest river basins: the Amazon, the Mississippi, the Niger, and the Saint-Lawrence. This ongoing project focuses on two main research questions: 1) How can we best prepare for the expected SWOT continental to global measurements before SWOT even flies?, and 2) What is the added value of including SWOT terrestrial measurements into global hydro models for enhancing our understanding of the terrestrial water cycle and the climate system? We present here the results of the second year of this project which now includes simulations from six numerical models of rivers over the Mississippi and sheds light on the implications of various modeling choices on simulation quality as well as on the potential impact of SWOT observations.

  18. Wind River Watershed Project; 1998 Annual Report; Volume II

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    1999-01-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds

  19. Columbia River: Terminal fisheries research project. 1994 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  20. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  1. Defense waste processing facility project at the Savannah River Plant

    International Nuclear Information System (INIS)

    Baxter, R.G.; Maher, R.; Mellen, J.B.; Shafranek, L.F.; Stevens, W.R. III.

    1984-01-01

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level waste at the Savannah River Plant near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes produced by defense activities at the site. At the present time engineering and design are 45% complete, the site has been cleared, and startup is expected in 1989. This paper will describe project status as well as features of the design. 9 figures

  2. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  3. Planning of transport corridors by use of GIS

    DEFF Research Database (Denmark)

    Kronbak, Jacob; Moshøj, Claus Rehfeld; Grevy, Bo

    1998-01-01

    The paper adresses principles for the application of geographical information systems (GIS) as a tool in the planning of transport corridors. Specifically, the paper describes the COPE (corridor planning and evaluation) model that has been developed within the EU 4th FP Strategic Transport projects...

  4. Alligator Rivers Analogue Project. Final Report - Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Duerden, P [Australian Nuclear Science and Technology Organisation (ANSTO), Lucas Heights, NSW (Australia); Lever, D A [AEA Technology, Harwell (United Kingdom); Sverjensky, D A [Johns Hopkins Univ., Baltimore, MD (United States); Townley, L R [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Wembley, WA (Australia). Div. of Water Resources

    1992-07-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  5. Alligator Rivers Analogue Project. Final Report - Volume 1

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  6. River Protection Project (RPP) Dangerous Waste Training Plan

    International Nuclear Information System (INIS)

    POHTO, R.E.

    2000-01-01

    This supporting document contains the training plan for dangerous waste management at River Protection Project TSD Units. This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by River Protection Project (RPP) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units managed by RPP are: the Double-Shell Tank (DST) System, 204-AR Waste Unloading Facility, Grout, and the Single-Shell Tank (SST) System. The program is designed in compliance with the requirements of Washington Administrative Code (WAC) 173-303-330 and Title 40 Code of Federal Regulations (CFR) 265.16 for the development of a written dangerous waste training program and the Hanford Facility Permit. Training requirements were determined by an assessment of employee duties and responsibilities. The RPP training program is designed to prepare employees to operate and maintain the Tank Farms in a safe, effective, efficient, and environmentally sound manner. In addition to preparing employees to operate and maintain the Tank Farms under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should abnormal or emergency conditions occur. Emergency response training is consistent with emergency responses outlined in the following Building Emergency Plans: HNF-IP-0263-TF and HNF-=IP-0263-209E

  7. River Protection Project (RPP) Dangerous Waste Training Plan

    Energy Technology Data Exchange (ETDEWEB)

    POHTO, R.E.

    2000-03-09

    This supporting document contains the training plan for dangerous waste management at River Protection Project TSD Units. This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by River Protection Project (RPP) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units managed by RPP are: the Double-Shell Tank (DST) System, 204-AR Waste Unloading Facility, Grout, and the Single-Shell Tank (SST) System. The program is designed in compliance with the requirements of Washington Administrative Code (WAC) 173-303-330 and Title 40 Code of Federal Regulations (CFR) 265.16 for the development of a written dangerous waste training program and the Hanford Facility Permit. Training requirements were determined by an assessment of employee duties and responsibilities. The RPP training program is designed to prepare employees to operate and maintain the Tank Farms in a safe, effective, efficient, and environmentally sound manner. In addition to preparing employees to operate and maintain the Tank Farms under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should abnormal or emergency conditions occur. Emergency response training is consistent with emergency responses outlined in the following Building Emergency Plans: HNF-IP-0263-TF and HNF-=IP-0263-209E.

  8. Metro Conservation Corridors

    Data.gov (United States)

    Minnesota Department of Natural Resources — The Metro Conservation Corridors (MeCC) grow out of the natural resource analysis work done by the DNR in the late '90's, documented in the Metro Greenprint...

  9. Office of River Protection: Simplifying Project management tools

    International Nuclear Information System (INIS)

    TAYLOR, D.G.

    2000-01-01

    The primary approach to the effort was to form a multi-organizational team comprised of federal and contractor staff to develop and implement the necessary tools and systems to manage the project. In late 1999 the DOE Manager of the Office of River Protection formed the Project Integration Office to achieve the objective of managing the efforts as a single project. The first major task, and the foundation upon which to base the development of all other tools, was the establishment of a single baseline of activities. However, defining a single scope schedule and cost was a difficult matter indeed. Work scopes were available throughout the project, but the level of detail and the integration of the activities existed primarily between working groups and individuals and not on a project-wide basis. This creates a situation where technical needs, logic flaws, resource balancing, and other similar integration needs are not elevated for management attention and resolution. It should be noted that probably 90% of the interface issues were known and being addressed. The key is simplifying the process and providing tangible assurance that the other 10% does not contain issues that can delay the project. Fortunately all of the contractors employed a common scheduling tool, which served as the basis for first communicating and then integrating baseline activities. Utilizing a powerful computer-based scheduling tool, it was soon possible to integrate the various schedules after the following was accomplished: Establishment of a scheduling specification (standardized input, coding, and approach to logic); and Clearly defined project assumptions

  10. Design project SP-RA, Construction specifications of the sanitary corridor - SP building; Idejni projekat SP-RA, Gradjevinski opis sanitarnog propusnika - objekat

    Energy Technology Data Exchange (ETDEWEB)

    Bon, B [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1956-11-09

    According to the design task the sanitary corridor satisfies the needs of both RA reactor and HL (Hot laboratory) buildings. This building is located between RA and HL buildings and is connected to both by corridors 3,3 m wide. The access to the building is from the south, i.e. from the local road in the Vinca Institute. [Serbo-Croat] Prema projektnom zadatku sanitarni propusnik zadovoljava potrebe objekata RA i HL. Zgrada je situirana izmedju ova dva objekta. Sa objektima RA i HL vezana je komunikativnim hodnikom sirine 3,3 m. Prilaz zgradi je sa juzne strane, odnosno sa internog puta Instituta Vinca.

  11. Global Analysis of Climate Change Projection Effects on Atmospheric Rivers

    Science.gov (United States)

    Espinoza, Vicky; Waliser, Duane E.; Guan, Bin; Lavers, David A.; Ralph, F. Martin

    2018-05-01

    A uniform, global approach is used to quantify how atmospheric rivers (ARs) change between Coupled Model Intercomparison Project Phase 5 historical simulations and future projections under the Representative Concentration Pathway (RCP) 4.5 and RCP8.5 warming scenarios. The projections indicate that while there will be 10% fewer ARs in the future, the ARs will be 25% longer, 25% wider, and exhibit stronger integrated water vapor transports (IVTs) under RCP8.5. These changes result in pronounced increases in the frequency (IVT strength) of AR conditions under RCP8.5: 50% (25%) globally, 50% (20%) in the northern midlatitudes, and 60% (20%) in the southern midlatitudes. The models exhibit systematic low biases across the midlatitudes in replicating historical AR frequency ( 10%), zonal IVT ( 15%), and meridional IVT ( 25%), with sizable intermodel differences. A more detailed examination of six regions strongly impacted by ARs suggests that the western United States, northwestern Europe, and southwestern South America exhibit considerable intermodel differences in projected changes in ARs.

  12. A Geophysical Characterization & Monitoring Strategy for Determining Hydrologic Processes in the Hyporheic Corridor at the Hanford 300-Area

    Energy Technology Data Exchange (ETDEWEB)

    Slater, Lee; Day-Lewis, Frederick; Lane, John; Versteeg, Roelof; Ward, Anderson; Binley, Andrew; Johnson, Timothy; Ntarlagiannis, Dimitrios

    2011-08-31

    The primary objective of this research was to advance the prediction of solute transport between the Uranium contaminated Hanford aquifer and the Columbia River at the Hanford 300 Area by improving understanding of how fluctuations in river stage, combined with subsurface heterogeneity, impart spatiotemporal complexity to solute exchange along the Columbia River corridor. Our work explored the use of continuous waterborne electrical imaging (CWEI), in conjunction with fiber-optic distributed temperature sensor (FO-DTS) and time-lapse resistivity monitoring, to improve the conceptual model for how groundwater/surface water exchange regulates uranium transport. We also investigated how resistivity and induced polarization can be used to generate spatially rich estimates of the variation in depth to the Hanford-Ringold (H-R) contact between the river and the 300 Area Integrated Field Research Challenge (IFRC) site. Inversion of the CWEI datasets (a data rich survey containing {approx}60,000 measurements) provided predictions of the distributions of electrical resistivity and polarizability, from which the spatial complexity of the primary hydrogeologic units along the river corridor was reconstructed. Variation in the depth to the interface between the overlying coarse-grained, high permeability Hanford Formation and the underlying finer-grained, less permeable Ringold Formation, an important contact that limits vertical migration of contaminants, has been resolved along {approx}3 km of the river corridor centered on the IFRC site in the Hanford 300 Area. Spatial variability in the thickness of the Hanford Formation captured in the CWEI datasets indicates that previous studies based on borehole projections and drive-point and multi-level sampling likely overestimate the contributing area for uranium exchange within the Columbia River at the Hanford 300 Area. Resistivity and induced polarization imaging between the river and the 300 Area IFRC further imaged spatial

  13. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  14. Swift fox survey along Heartland Expressway Corridor.

    Science.gov (United States)

    2015-05-01

    The swift fox (Vulpes velox) is a small canid classified as endangered within the : state of Nebraska. Future construction of the Heartland Expressway Corridor (HEC), a : 300 km road expansion project in the panhandle of the state, may impact the res...

  15. Fisher research and the Kings River Sustainable Forest Ecosystem Project: current results and future efforts

    Science.gov (United States)

    Brian B. Boroski; Richard T. Golightly; Amie K. Mazzoni; Kimberly A. Sager

    2002-01-01

    The Kings River Sustainable Forest Ecosystems Project was initiated on the Kings River Ranger District of the Sierra National Forest, California, in 1993, with fieldwork beginning in 1994. Knowledge of the ecology of the fisher (Martes pennanti) in the Project area, and in the Sierra Nevada of California in general, is insufficient to develop...

  16. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  17. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  18. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Evaluating landscape options for corridor restoration between giant panda reserves.

    Directory of Open Access Journals (Sweden)

    Fang Wang

    Full Text Available The establishment of corridors can offset the negative effects of habitat fragmentation by connecting isolated habitat patches. However, the practical value of corridor planning is minimal if corridor identification is not based on reliable quantitative information about species-environment relationships. An example of this need for quantitative information is planning for giant panda conservation. Although the species has been the focus of intense conservation efforts for decades, most corridor projects remain hypothetical due to the lack of reliable quantitative researches at an appropriate spatial scale. In this paper, we evaluated a framework for giant panda forest corridor planning. We linked our field survey data with satellite imagery, and conducted species occupancy modelling to examine the habitat use of giant panda within the potential corridor area. We then conducted least-cost and circuit models to identify potential paths of dispersal across the landscape, and compared the predicted cost under current conditions and alternative conservation management options considered during corridor planning. We found that due to giant panda's association with areas of low elevation and flat terrain, human infrastructures in the same area have resulted in corridor fragmentation. We then identified areas with high potential to function as movement corridors, and our analysis of alternative conservation scenarios showed that both forest/bamboo restoration and automobile tunnel construction would significantly improve the effectiveness of corridor, while residence relocation would not significantly improve corridor effectiveness in comparison with the current condition. The framework has general value in any conservation activities that anticipate improving habitat connectivity in human modified landscapes. Specifically, our study suggested that, in this landscape, automobile tunnels are the best means to remove current barriers to giant panda

  20. Statewide GIS mapping of recurring congestion corridors : final report.

    Science.gov (United States)

    2009-07-01

    Recurring congestion occurs when travel demand reaches or exceeds the available roadway : capacity. This project developed an interactive geographic information system (GIS) map of the : recurring congestion corridors (labeled herein as hotspots) in ...

  1. The Snake River Plain Volcanic Province: Insights from Project Hotspot

    Science.gov (United States)

    Shervais, J. W.; Potter, K. E.; Hanan, B. B.; Jean, M. M.; Duncan, R. A.; Champion, D. E.; Vetter, S.; Glen, J. M. G.; Christiansen, E. H.; Miggins, D. P.; Nielson, D. L.

    2017-12-01

    The Snake River Plain (SRP) Volcanic Province is the best modern example of a time-transgressive hotspot track beneath continental crust. The SRP began 17 Ma with massive eruptions of Columbia River basalt and rhyolite. After 12 Ma volcanism progressed towards Yellowstone, with early rhyolite overlain by basalts that may exceed 2 km thick. The early rhyolites are anorogenic with dry phenocryst assemblages and eruption temperatures up to 950C. Tholeiitic basalts have major and trace element compositions similar to ocean island basalts (OIB). Project Hotspot cored three deep holes in the central and western Snake River Plain: Kimama (mostly basalt), Kimberly (mostly rhyolite), and Mountain Home (lake sediments and basaslt). The Kimberly core documents rhyolite ash flows up to 700 m thick, possibly filling a caldera or sag. Chemical stratigraphy in Kimama and other basalt cores document fractional crystallization in relatively shallow magma chambers with episodic magma recharge. Age-depth relations in the Kimama core suggest accumulation rates of roughly 305 m/Ma. Surface and subsurface basalt flows show systematic variations in Sr-Nd-Pb isotopes with distance from Yellowstone interpreted to reflect changes in the proportion of plume source and the underlying heterogeneous cratonic lithosphere, which varies in age, composition, and thickness from west to east. Sr-Nd-Pb isotopes suggest <5% lithospheric input into a system dominated by OIB-like plume-derived basalts. A major flare-up of basaltic volcanism occurred 75-780 ka throughout the entire SRP, from Yellowstone in the east to Boise in the west. The youngest western SRP basalts are transitional alkali basalts that range in age from circa 900 ka to 2 ka, with trace element and isotopic compositions similar to the plume component of Hawaiian basalts. These observations suggest that ancient SCLM was replaced by plume mantle after the North America passed over the hotspot in the western SRP, which triggered renewed

  2. Evaluation of nuclear facility decommissioning projects. Project summary report, Elk River Reactor

    International Nuclear Information System (INIS)

    Miller, R.L.; Adams, J.A.

    1982-12-01

    This report summarizes information concerning the decommissioning of the Elk River Reactor. Decommissioning data from available documents were input into a computerized data-handling system in a manner that permits specific information to be readily retrieved. The information is in a form that assists the Nuclear Regulatory Commission in its assessment of decommissioning alternatives and ALARA methods for future decommissionings projects. Samples of computer reports are included in the report. Decommissioning of other reactors, including NRC reference decommissioning studies, will be described in similar reports

  3. Long Island Smart Energy Corridor

    Energy Technology Data Exchange (ETDEWEB)

    Mui, Ming [Long Island Power Authority, Uniondale, NY (United States)

    2015-02-04

    The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential

  4. Development of streamflow projections under changing climate conditions over Colorado River basin headwaters

    Directory of Open Access Journals (Sweden)

    W. P. Miller

    2011-07-01

    Full Text Available The current drought over the Colorado River Basin has raised concerns that the US Department of the Interior, Bureau of Reclamation (Reclamation may impose water shortages over the lower portion of the basin for the first time in history. The guidelines that determine levels of shortage are affected by relatively short-term (3 to 7 month forecasts determined by the Colorado Basin River Forecast Center (CBRFC using the National Weather Service (NWS River Forecasting System (RFS hydrologic model. While these forecasts by the CBRFC are useful, water managers within the basin are interested in long-term projections of streamflow, particularly under changing climate conditions. In this study, a bias-corrected, statistically downscaled dataset of projected climate is used to force the NWS RFS utilized by the CBRFC to derive projections of streamflow over the Green, Gunnison, and San Juan River headwater basins located within the Colorado River Basin. This study evaluates the impact of changing climate to evapotranspiration rates and contributes to a better understanding of how hydrologic processes change under varying climate conditions. The impact to evapotranspiration rates is taken into consideration and incorporated into the development of streamflow projections over Colorado River headwater basins in this study. Additionally, the NWS RFS is modified to account for impacts to evapotranspiration due to changing temperature over the basin. Adjusting evapotranspiration demands resulted in a 6 % to 13 % average decrease in runoff over the Gunnison River Basin when compared to static evapotranspiration rates. Streamflow projections derived using projections of future climate and the NWS RFS provided by the CBRFC resulted in decreased runoff in 2 of the 3 basins considered. Over the Gunnison and San Juan River basins, a 10 % to 15 % average decrease in basin runoff is projected through the year 2099. However, over the Green River basin, a 5 % to 8

  5. The role of climatic cycles and trans-Saharan migration corridors in species diversification: Biogeography of Psammophis schokari group in North Africa.

    Science.gov (United States)

    Gonçalves, Duarte Vasconcelos; Martínez-Freiría, Fernando; Crochet, Pierre-André; Geniez, Philippe; Carranza, Salvador; Brito, José Carlos

    2018-01-01

    Highlands, hydrographic systems and coastal areas have been hypothesised to form corridors across the hyperarid Sahara desert in North Africa, allowing dispersal and gene flow for non-xeric species. Here we aim to provide a genetic test for the trans-Saharan corridor model, and predict the location and stability of ecological-corridors, by combining phylogeography and palaeoclimatic modelling. The model was the Psammophis schokari (Schokari sand racer) group, fast-moving and widely distributed generalist colubrids occurring mostly in arid and semiarid scrublands. We combined dated phylogenies of mitochondrial and nuclear markers with palaeoclimatic modelling. For the phylogeographic analysis, we used 75 samples of P. schokari and P. aegyptius, and Bayesian and Maximum-Likelihood methods. For the ecological models, we used Maxent over the distribution of P. schokari and West African lineages. Models were projected to past conditions (mid Holocene, Last Glacial Maximum and Last Inter-Glacial) to infer climatic stable areas. Climatic stability was predicted to be mostly restricted to coastal areas and not spatially continuous. A putative temporary trans-Saharan corridor was identified in Eastern Sahara, with a more stable one along the Atlantic coast. Six parapatric lineages were identified within P. schokari, four occurring in North Africa. These likely diverged during the Pliocene. The Tamanraset River might have been a vicariant agent. African lineages may have experienced further subsequent diversification during the late Pleistocene. The main P. schokari refugia were probably located along the northern margins of the Sahara, allowing its North-to-South colonization. Trans-Saharan corridors seem to have played a role in P. schokari biogeography, allowing colonization of central Saharan mountains and Sahel. Some might have worked as refugia, and even the most stable corridors may have sections working as filters, depending on each climatic phase. We expect the use

  6. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  7. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R. Todd; Sexton, Amy D.

    2003-02-01

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on the mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included

  8. Environmental impacts of Ghazi Barotha hydropower project on river Indus and surrounding areas

    International Nuclear Information System (INIS)

    Soomro, G.A.; Sufi, A.B.

    2005-01-01

    WAPDA being an esteemed organization of the country is involved in development of Water and Power Sector Projects. Ghazi Barotha Hydropower Project is another huge hydropower generation project in the country after Tarbela. The barrage to feed power channel of Ghazi Barotha Power Station are built over River Indus 7 Km down of Tarbela Dam. The project has been constructed to utilize the hydraulic head for power generation that is available between the tailrace of Tarbela Dam and the confluence of Haro River. In this reach river Indus drops by 76 m in distance of 63 Km. This is solely a power generation project with an installed capacity of 1450 MW. The purpose of this paper is to assess the negative impacts on the River Indus due to the construction of GBHP as Water of river Indus will be diverted to the power channel and the river Indus flows go to its lowest in low flow season. The reduction in river flow may change the ecology of the river - belas and people dependant on river water. In this context a study was made to keep the negative environmental impacts as low as possible and suggest mitigation measures to reduce negative impacts and provide enhancement measure to compensate the losses to be sustained by the area people and maintain the social life along with the ecology of the area less disturbed. The study demonstrated that the project is technically sound, economically viable and has limited environmental and social impacts on the area overall and specific the belas and people dependant on the Indus Water from Tarbela downstream up to confluence of Kabul River. (author)

  9. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  10. Hotspot: the Snake River Geothermal Drilling Project--initial report

    Science.gov (United States)

    Shervais, J.W.; Nielson, D.; Lachmar, T.; Christiansen, E.H.; Morgan, L.; Shanks, Wayne C.; Delahunty, C.; Schmitt, D.R.; Liberty, L.M.; Blackwell, D.D.; Glen, J.M.; Kessler, J.A.; Potter, K.E.; Jean, M.M.; Sant, C.J.; Freeman, T.

    2012-01-01

    The Snake River volcanic province (SRP) overlies a thermal anomaly that extends deep into the mantle; it represents one of the highest heat flow provinces in North America. The primary goal of this project is to evaluate geothermal potential in three distinct settings: (1) Kimama site: inferred high sub-aquifer geothermal gradient associated with the intrusion of mafic magmas, (2) Kimberly site: a valley-margin setting where surface heat flow may be driven by the up-flow of hot fluids along buried caldera ringfault complexes, and (3) Mountain Home site: a more traditional fault-bounded basin with thick sedimentary cover. The Kimama hole, on the axial volcanic zone, penetrated 1912 m of basalt with minor intercalated sediment; no rhyolite basement was encountered. Temperatures are isothermal through the aquifer (to 960 m), then rise steeply on a super-conductive gradient to an estimated bottom hole temperature of ~98°C. The Kimberly hole is on the inferred margin of a buried rhyolite eruptive center, penetrated rhyolite with intercalated basalt and sediment to a TD of 1958 m. Temperatures are isothermal at 55-60°C below 400 m, suggesting an immense passive geothermal resource. The Mountain Home hole is located above the margin of a buried gravity high in the western SRP. It penetrates a thick section of basalt and lacustrine sediment overlying altered basalt flows, hyaloclastites, and volcanic sediments, with a TD of 1821 m. Artesian flow of geothermal water from 1745 m depth documents a power-grade resource that is now being explored in more detail. In-depth studies continue at all three sites, complemented by high-resolution gravity, magnetic, and seismic surveys, and by downhole geophysical logging.

  11. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Science.gov (United States)

    2010-02-05

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for...

  12. Foaming in Hanford River Protection Project Waste Treatment Plant LAW Evaporation Processes - FY01 Summary Report

    International Nuclear Information System (INIS)

    Calloway, T.B.

    2002-01-01

    The LAW evaporation processes currently being designed for the Hanford River Protection Project Waste Treatment Plant are subject to foaming. Experimental simulant studies have been conducted in an effort to achieve an effective antifoam agent suitable to mitigate such foaming

  13. Alligator Rivers Analogue project. Hydrogeological modelling. Final Report - Volume 6

    International Nuclear Information System (INIS)

    Townley, L.R.; Trefry, M.G.; Barr, A.D.; Braumiller, S.

    1992-01-01

    This volume describes hydrogeological modelling carried out as part of the Alligator Rivers Analogue Project. Hydrogeology has played a key integrating role in the Project, largely because water movement is believed to have controlled the evolution of the Koongarra uranium Orebody and therefore affects field observations of all types at all scales. Aquifer testing described uses the concept of transmissivity in its interpretation of aquifer response to pumping. The concept of an aquifer, a layer transmitting significant quantities of water in a mainly horizontal direction, seems hard to accept in an environment as heterogeneous as that at Koongarra. But modelling of aquifers both in one dimension and two dimensionally in plan has contributed significantly to our understanding of the site. A one-dimensional model with three layers (often described as a quasi two dimensional model) was applied to flow between the Fault and Koongarra Creek. Being a transient model, this model was able to show that reverse flows can indeed occur back towards the Fault, but only if there is distributed recharge over the orebody as well as a mechanism for the Fault, or a region near the Fault, to remove water from the simulated cross-section. The model also showed clearly that the response of the three-layered system, consisting of a highly weathered zone, a fractured transmissive zone and a less conductive lower schist zone, is governed mainly by the transmissivity and storage coefficient of the middle layer. The storage coefficient of the higher layer has little effect. A two-dimensional model in plan used a description of anisotropy to show that reverse flows can also occur even without a conducting Fault. Modelling of a three-dimensional region using discrete fractures showed that it is certainly possible to simulate systems like that observed at Koongarra, but that large amounts of data are probably needed to obtain realistic descriptions of the fracture networks. Inverse modelling

  14. Alligator Rivers Analogue project. Hydrogeological modelling. Final Report - Volume 6

    Energy Technology Data Exchange (ETDEWEB)

    Townley, L R; Trefry, M G; Barr, A D [CSIRO Div of Water Resources, PO Wembley, WA (Australia); Braumiller, S [Univ of Arizona, Tucson, AZ (United States). Dept of Hydrology and Water Resources; Kawanishi, M [Central Research Institute of Electric Power Industry, Abiko-Shi, Chiba-Ken (Japan); and others

    1993-12-31

    This volume describes hydrogeological modelling carried out as part of the Alligator Rivers Analogue Project. Hydrogeology has played a key integrating role in the Project, largely because water movement is believed to have controlled the evolution of the Koongarra uranium Orebody and therefore affects field observations of all types at all scales. Aquifer testing described uses the concept of transmissivity in its interpretation of aquifer response to pumping. The concept of an aquifer, a layer transmitting significant quantities of water in a mainly horizontal direction, seems hard to accept in an environment as heterogeneous as that at Koongarra. But modelling of aquifers both in one dimension and two dimensionally in plan has contributed significantly to our understanding of the site. A one-dimensional model with three layers (often described as a quasi two dimensional model) was applied to flow between the Fault and Koongarra Creek. Being a transient model, this model was able to show that reverse flows can indeed occur back towards the Fault, but only if there is distributed recharge over the orebody as well as a mechanism for the Fault, or a region near the Fault, to remove water from the simulated cross-section. The model also showed clearly that the response of the three-layered system, consisting of a highly weathered zone, a fractured transmissive zone and a less conductive lower schist zone, is governed mainly by the transmissivity and storage coefficient of the middle layer. The storage coefficient of the higher layer has little effect. A two-dimensional model in plan used a description of anisotropy to show that reverse flows can also occur even without a conducting Fault. Modelling of a three-dimensional region using discrete fractures showed that it is certainly possible to simulate systems like that observed at Koongarra, but that large amounts of data are probably needed to obtain realistic descriptions of the fracture networks. Inverse modelling

  15. RIVER INTER-LINKING (RIL) PROJECT: A QUESTION ON INDIAN FEDERALISM.

    OpenAIRE

    Shazia Waheed; Pradip Kumar Jha.

    2017-01-01

    The Supreme Court of India, in 2002 directed the central government to link major Indian rivers within 10 years. In December 2002, the government appointed a task force on interlinking of 37 rivers and the dead line was extended by 2016. The RIL project not only raises national issue but also give way to international conflict in South Asia over sharing of river waters. The paper examines the impact of the RIL project on the paradigms and working of Indian federalism. It is based on triangula...

  16. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  17. Monitoring and Evaluation of Environmental Flow Prescriptions for Five Demonstration Sites of the Sustainable Rivers Project

    Science.gov (United States)

    Konrad, Christopher P.

    2010-01-01

    The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.

  18. Handling sediments in Dutch river management: The planning stage of the Maaswerken river widening project

    NARCIS (Netherlands)

    Meulen, M.J. van der; Rijnveld, M.; Gerrits, L.M.; Joziasse, J.; Heijst, M.W.I.M. van; Gruijters, S.H.L.L.

    2006-01-01

    Goals, Scope and Background. Faced with higher peak discharges in the foreseeable future, the Dutch government has decided to increase the discharge capacities of the Dutch Rhine and Meuse rivers. Instead of raising the dikes, river widening measures are to be undertaken, in and along the riverbed.

  19. Water quality and quantity of selected springs and seeps along the Colorado River corridor, Utah and Arizona: Arches National Park, Canyonlands National Park, Glen Canyon National Recreation Area, and Grand Canyon National Park, 1997-98

    Science.gov (United States)

    Taylor, Howard E.; Spence, John R.; Antweiler, Ronald C.; Berghoff, Kevin; Plowman, Terry I.; Peart, Dale B.; Roth, David A.

    2004-01-01

    The U.S. Geological Survey, in cooperation with the National Park Service conducted an intensive assessment of selected springs along the Colorado River Corridor in Arches National Park, Canyonlands National Park, Glen Canyon National Recreation Area, and Grand Canyon National Park in 1997 and 1998, for the purpose of measuring and evaluating the water quality and quantity of the resource. This study was conducted to establish baseline data for the future evaluation of possible effects from recreational use and climate change. Selected springs and seeps were visited over a study period from 1997 to 1998, during which, discharge and on-site chemical measurements were made at selected springs and seeps, and samples were collected for subsequent chemical laboratory analysis. This interdisciplinary study also includes simultaneous studies of flora and fauna, measured and sampled coincidently at the same sites. Samples collected during this study were transported to U.S. Geological Survey laboratories in Boulder, Colorado, where analyses were performed using state-of-the-art laboratory technology. The location of the selected springs and seeps, elevation, geology, aspect, and onsite measurements including temperature, discharge, dissolved oxygen, pH, and specific conductance, were recorded. Laboratory analyses include determinations for alkalinity, aluminum, ammonium (nitrogen), antimony, arsenic, barium, beryllium, bismuth, boron, bromide, cadmium, calcium, cerium, cesium, chloride, chromium, cobalt, copper, dissolved inorganic carbon, dissolved organic carbon, dysprosium, erbium, europium, fluoride, gadolinium, holmium, iodine, iron, lanthanum, lead, lithium, lutetium, magnesium, manganese, mercury, molybdenum, neodymium, nickel, nitrate (nitrogen), nitrite (nitrogen), phosphate, phosphorus, potassium, praseodymium, rhenium, rubidium, samarium, selenium, silica, silver, sodium, strontium, sulfate, tellurium, terbium, thallium, thorium, thulium, tin, titanium, tungsten

  20. Umatilla River Basin Anadromus Fish Habitat Enhancement Project. 1994 Annual report

    International Nuclear Information System (INIS)

    Shaw, R.T.

    1994-05-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing cooperative instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower 1/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River in the vicinity of Gibbon, Oregon. In 1993, the project shifted emphasis to a comprehensive watershed approach, consistent with other basin efforts, and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. During the 1994--95 project period, a one river mile demonstration project was implemented on two privately owned properties on Wildhorse Creek. This was the first watershed improvement project to be implemented by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) off of the Reservation

  1. China-Pakistan Economic Corridor.

    Energy Technology Data Exchange (ETDEWEB)

    Boyce, Tucker [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    International trade and related economic activities in Central and South Asia are increasing as developing economies, particularly India and Pakistan, grow. China continues to emerge as a major regional and global power and has embarked upon numerous regional economic and political initiatives . A major development is the China - Pakistan Economic Corridor (CPEC), a host of infrastructure and trade projects worth over 40 billion American dollars . This report analyzes CPEC a nd its potential regional effects, including the trade security implications of the port and land infrastructure developments . As trade increase s in the reg ion and the major CPEC infrastructure projects are completed, there will be numerous implications on trade security and geopolitics within South Asia. CPEC projects uniquely intersect numerous regional situations, including territorial disputes in Kashmir, the Afghanistan/Pakistan border, and Chinese foreign policy a mbitions. A nuanced understanding of these effects can influence future policy adjustments in this region . The views expressed in this report are those of the author and do not necessarily reflect the position of Sandia National Laboratories or the author's current and past institutions.

  2. Flood management selections for the Yangtze River midstream after the Three Gorges Project operation

    Science.gov (United States)

    Fang, Hongwei; Han, Dong; He, Guojian; Chen, Minghong

    2012-04-01

    SummaryAfter the Yangtze River was closed by the Three Gorges Project (TGP) in 2003, erosion occurred from the dam site to the river mouth, especially in the middle and lower reaches of the Yangtze River. However, in some local areas of Chenglingji reach which holds the key position for flood management, there is actually deposition in contrast to the expected erosion. In this paper, a one dimensional mathematical model of the river network with sediment transport is used as the tool to simulate flow and fluvial processes. The calculation domain is from Yichang, which is downstream of the dam, to Hankou, the controlling node of flood management, 694 km long in total. The model is calibrated based on the field data of hydrology and sediment transport during the period from October 2003 to October 2008. Then the model is utilized to simulate the erosion and deposition of the middle and lower reaches of the Yangtze River in the next two decades, and produce the results of a new river channel after river bed deformation occurs. The typical flood processes of 1954 and 1998 in the Yangtze River basin are used to check the flood management scheme for the research area, and results show that water storage of Three Gorges Reservoir (TGR) and a flood diversion program downstream of the Yangtze River should be taken into consideration.

  3. 78 FR 56692 - Colorado River Storage Project-Rate Order No. WAPA-161

    Science.gov (United States)

    2013-09-13

    ... existing Salt Lake City Area Integrated Projects (SLCA/IP) Firm Power Rate and the Colorado River Storage...-6372, email [email protected] , or Mr. Rodney Bailey, Power Marketing Manager, CRSP Management Center...: Western Area Power Administration Temporary Extension for Salt Lake City Area Integrated Projects Firm...

  4. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  5. Green corridors and network design

    DEFF Research Database (Denmark)

    Panagakos, George

    2016-01-01

    The purpose of this chapter is to investigate the relation between the Trans-European Transport Network (TEN-T) and the green corridor concept. First, the need is established for a corridor governance structure that enables the close cooperation among the numerous stakeholders from both the public...

  6. The new Wallula CO2 project may revive the old Columbia River Basalt (western USA) nuclear-waste repository project

    Science.gov (United States)

    Schwartz, Michael O.

    2018-02-01

    A novel CO2 sequestration project at Wallula, Washington, USA, makes ample use of the geoscientific data collection of the old nuclear waste repository project at the Hanford Site nearby. Both projects target the Columbia River Basalt (CRB). The new publicity for the old project comes at a time when the approach to high-level nuclear waste disposal has undergone fundamental changes. The emphasis now is on a technical barrier that is chemically compatible with the host rock. In the ideal case, the waste container is in thermodynamic equilibrium with the host-rock groundwater regime. The CRB groundwater has what it takes to represent the ideal case.

  7. San Jacinto River oil spill: wetland bioremediation project

    International Nuclear Information System (INIS)

    Mills, M.A.; Bonner, J.S.

    1996-01-01

    Gasoline, diesel and unrefined Arabian light crude oil were accidentally released into the San Jacinto River after a series of pipelines ruptured. Natural removal processes (volatilization, dissolution, weathering), fire, and the spill clean-up effort, removed approximately 95% of the petroleum. The area where residual oil was found was an estuarine wetland on the lower San Jacinto River. Samples were collected from 21 study areas and an evaluation of the varying levels of bioremediation was conducted. Phase one has been completed and involved the evaluation of the natural recovery of oil from the spill. Phase two was still in progress and involved the addition of inorganic nutrients and the alternate electron acceptor to enhance the biodegradation of the petroleum. Results showed that biodegradation was responsible for much of the reduction of certain components in petroleum within the first 150 days. 12 refs., 8 figs

  8. Hood River and Pelton Ladder monitoring and evaluation project and Hood River fish habitat project : annual progress report 1999-2000.; ANNUAL

    International Nuclear Information System (INIS)

    Lambert, Michael B.; McCanna, Joseph P.; Jennings, Mick

    2001-01-01

    The Hood River subbasin is home to four species of anadromous salmonids: chinook salmon (Oncorhynchus tshawytscha), coho salmon (Oncorhynchus kisutch), steelhead (Oncorhynchus mykiss), and sea run cutthroat trout (Salmo clarki). Indigenous spring chinook salmon were extirpated during the late 1960's. The naturally spawning spring chinook salmon currently present in the subbasin are progeny of Deschutes stock. Historically, the Hood River subbasin hatchery steelhead program utilized out-of-basin stocks for many years. Indigenous stocks of summer and winter steelhead were listed in March 1998 by National Marine Fisheries Service (NMFS) under the Endangered Species Act (ESA) as a ''Threatened'' Species along with similar genetically similar steelhead in the Lower Columbia Basin. This annual report summarizes work for two consecutive contract periods: the fiscal year (FY) 1999 contract period was 1 October, 1998 through 30 September, 1999 and 1 October, 1999 through 30 September, 2000 for FY 2000. Work implemented during FY 1999 and FY 2000 included (1) acclimation of hatchery spring chinook salmon and hatchery summer and winter steelhead smolts, (2) spring chinook salmon spawning ground surveys on the West Fork Hood River (3) genetic analysis of steelhead and cutthroat[contractual service with the ODFW], (4) Hood River water temperature studies, (5) Oak Springs Hatchery (OSH) and Round Butte Hatchery (RBH) coded-wire tagging and clipping evaluation, (6) preparation of the Hood River Watershed Assessment (Coccoli et al., December 1999) and the Fish Habitat Protection, Restoration, and Monitoring Plan (Coccoli et al., February 2000), (7) project implementation of early action habitat protection and restoration projects, (8) Pelton Ladder evaluation studies, (9) management oversight and guidance to BPA and ODFW engineering on HRPP facilities, and (10) preparation of an annual report summarizing project objectives for FY 1999 and FY 2000

  9. Influence of the Three Gorges Project on saltwater intrusion in the Yangtze River Estuary

    Science.gov (United States)

    An, Qiang; Wu, Yanqing; Taylor, Shauna; Zhao, Bin

    2009-02-01

    The Three Gorges Project (TGP) is a transcentury project that has aroused world attention. It is expected that the flow velocity and runoff of the Yangtze River will be changed after the project has been accomplished. Consequently, however, the ecological environment in the Yangtze River Basin, particularly in the estuary region, will be affected. Salinity intrusion into the Yangtze River estuary, in general, is mostly affected by the Yangtze River discharge and its external tidal level. This paper focuses on examining the influence of changes in runoff on salinity value. The question, to which should be paid attention is: how is the interaction between changes in runoff of the Yangtze River and salinity distribution in the Yangtze River estuary, China? In this research, a three-dimensional model has been used to identify the effects of runoff change on salinity distribution. The drawn conclusion is that the change of salinity is influenced by discharge variation. Positive and negative impacts of TGP would both turn up but in different period. In sum, TGP is in favor of restraining saltwater intrusion. Nevertheless a suitable method should be found to resolve its negative influences.

  10. Sediment cores and chemistry for the Kootenai River White Sturgeon Habitat Restoration Project, Boundary County, Idaho

    Science.gov (United States)

    Barton, Gary J.; Weakland, Rhonda J.; Fosness, Ryan L.; Cox, Stephen E.; Williams, Marshall L.

    2012-01-01

    The Kootenai Tribe of Idaho, in cooperation with local, State, Federal, and Canadian agency co-managers and scientists, is assessing the feasibility of a Kootenai River habitat restoration project in Boundary County, Idaho. This project is oriented toward recovery of the endangered Kootenai River white sturgeon (Acipenser transmontanus) population, and simultaneously targets habitat-based recovery of other native river biota. Projects currently (2010) under consideration include modifying the channel and flood plain, installing in-stream structures, and creating wetlands to improve the physical and biological functions of the ecosystem. River restoration is a complex undertaking that requires a thorough understanding of the river. To assist in evaluating the feasibility of this endeavor, the U.S. Geological Survey collected and analyzed the physical and chemical nature of sediment cores collected at 24 locations in the river. Core depths ranged from 4.6 to 15.2 meters; 21 cores reached a depth of 15.2 meters. The sediment was screened for the presence of chemical constituents that could have harmful effects if released during restoration activities. The analysis shows that concentrations of harmful chemical constituents do not exceed guideline limits that were published by the U.S. Army Corps of Engineers in 2006.

  11. Change In Course Pattern Of The Teesta River: After Effect Of An Engineering Project

    Science.gov (United States)

    Ashrafi, Z. M.; Shuvo, S. D.; Mahmud, M. S.

    2016-12-01

    Bangladesh is blessed by rivers that contribute to country's agriculture, landscape development and water supply. Due to nature of the river's flow and morphology, several engineering project have been initiated to enhance its utility, Teesta barrage was one of them. After two decades of its construction in Northern Bangladesh, several study identified major impacts on local ecosystem due to hindrance in water flow. However, how Teesta River evolved in last 25 years after the barrage construction, has not been quantified yet. This study quantifies the downstream evolution of Teesta River in after-construction period (1990-2015). Time series earth observation satellite (Landsat) data and geo-spatial techniques have been utilized to understand the changes in course pattern. Besides, sinuosity index has been used to quantify it. Analysis shows that the river is becoming more braided with the rise of numerous `Char' areas (islands); as well as bifurcation of the main channel, creating newer channels increasingly. Statistically significant changes in Sinuosity Index (SI) of the Teesta river has found in post construction period. In some locations SI increased which indicate that the river is becoming more and more winding than straight it used to be around 1990. It is also found that the river is shifting towards the east where the number of human settlement is higher. The rate of shifting has accelerated during the 2000s. There are places where the course has moved about 3 kilometers from its earlier course. Therefore, higher number of human settlements are in threat of river bank erosion in recent years. River bank management should be developed considering the pattern of course change so that rural settlement can save from destructive river bank erosion.

  12. Reaching for 100% participation in a utility conservation programme: the Hood River project

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, Eric

    1989-04-01

    The Hood River Conservation Project (HRCP) was a major residential retrofit demonstration project. The project was intended to install as many cost-effective retrofit measures in all electrically heated homes in Hood River, OR, USA. To achieve 100% participation, HRCP offered a package of 'super' retrofit measures and paid for installation of these measures. Almost all (91%) of the eligible households participated, in stark contrast to the much lower participation levels achieved in other residential conservation programmes. Also, unlike other programmes, HRCP attracted larger fractions of traditionally hard-to-reach groups: low-income households; occupants of multifamily units; and renters. The key factors leading to this phenomenal success include: the offer of free retrofits; determination on the part of staff to enlist every eligible household; the use of community-based marketing approaches; and reliance on extensive word-of-mouth among Hood River residents. (author).

  13. Congestion relief by travel time minimization in near real time : Detroit area I-75 corridor study.

    Science.gov (United States)

    2008-12-01

    "This document summarizes the activities concerning the project: Congestion Relief by : Travel Time Minimization in Near Real Time -- Detroit Area I-75 Corridor Study since : the inception of the project (Nov. 22, 2006 through September 30, 2008). : ...

  14. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Data Report

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barber, David S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Betsill, J. David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Littlefield, Adriane C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Mohagheghi, Amir H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shanks, Sonoya T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Yuldashev, Bekhzad [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Saalikhbaev, Umar [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Radyuk, Raisa [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Djuraev, Akram [Tajik Academy of Sciences, Dushanbe (Tajikistan); Djuraev, Anwar [Tajik Academy of Sciences, Dushanbe (Tajikistan); Vasilev, Ivan [Inst. of Physics, Bishkek (Kyrgyzstan); Tolongutov, Bajgabyl [Inst. of Physics, Bishkek (Kyrgyzstan); Valentina, Alekhina [Inst. of Physics, Bishkek (Kyrgyzstan); Solodukhin, Vladimir [Inst. of Nuclear Physics, Almaty (Kazakhstan); Pozniak, Victor [Inst. of Nuclear Physics, Almaty (Kazakhstan)

    2003-04-01

    The Navruz Project is a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan, and facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. The Project also collects data on basic water quality parameters. Data obtained in this project are shared among all participating countries and the public through a world-wide web site (http://www.cmc.sandia.org/Central/centralasia.html), and are available for use in further studies and in regional transboundary water resource management efforts. This report includes graphs showing selected data from the Fall 2000 and Spring 2001 sampling seasons. These data include all parameters grouped into six regions, including main rivers and some tributaries in the Amu Darya and Syr Darya river systems. This report also assembles all data (in tabular form) generated by the project from Fall 2000 through Fall 2001. This report comes as the second part of a planned three-part reporting process. The first report is the Sampling and Analysis Plan and Operational Manual, SAND 2002-0484. This is the second report.

  15. South Asia river-flow projections and their implications for water resources

    Science.gov (United States)

    Mathison, C.; Wiltshire, A. J.; Falloon, P.; Challinor, A. J.

    2015-12-01

    South Asia is a region with a large and rising population, a high dependence on water intense industries, such as agriculture and a highly variable climate. In recent years, fears over the changing Asian summer monsoon (ASM) and rapidly retreating glaciers together with increasing demands for water resources have caused concern over the reliability of water resources and the potential impact on intensely irrigated crops in this region. Despite these concerns, there is a lack of climate simulations with a high enough resolution to capture the complex orography, and water resource analysis is limited by a lack of observations of the water cycle for the region. In this paper we present the first 25 km resolution regional climate projections of river flow for the South Asia region. Two global climate models (GCMs), which represent the ASM reasonably well are downscaled (1960-2100) using a regional climate model (RCM). In the absence of robust observations, ERA-Interim reanalysis is also downscaled providing a constrained estimate of the water balance for the region for comparison against the GCMs (1990-2006). The RCM river flow is routed using a river-routing model to allow analysis of present-day and future river flows through comparison with available river gauge observations. We examine how useful these simulations are for understanding potential changes in water resources for the South Asia region. In general the downscaled GCMs capture the seasonality of the river flows but overestimate the maximum river flows compared to the observations probably due to a positive rainfall bias and a lack of abstraction in the model. The simulations suggest an increasing trend in annual mean river flows for some of the river gauges in this analysis, in some cases almost doubling by the end of the century. The future maximum river-flow rates still occur during the ASM period, with a magnitude in some cases, greater than the present-day natural variability. Increases in river flow

  16. Changes in groundwater recharge under projected climate in the upper Colorado River basin

    Science.gov (United States)

    Tillman, Fred; Gangopadhyay, Subhrendu; Pruitt, Tom

    2016-01-01

    Understanding groundwater-budget components, particularly groundwater recharge, is important to sustainably manage both groundwater and surface water supplies in the Colorado River basin now and in the future. This study quantifies projected changes in upper Colorado River basin (UCRB) groundwater recharge from recent historical (1950–2015) through future (2016–2099) time periods, using a distributed-parameter groundwater recharge model with downscaled climate data from 97 Coupled Model Intercomparison Project Phase 5 climate projections. Simulated future groundwater recharge in the UCRB is generally expected to be greater than the historical average in most decades. Increases in groundwater recharge in the UCRB are a consequence of projected increases in precipitation, offsetting reductions in recharge that would result from projected increased temperatures.

  17. Influence of the South-North Water Diversion Project and the mitigation projects on the water quality of Han River.

    Science.gov (United States)

    Zhu, Y P; Zhang, H P; Chen, L; Zhao, J F

    2008-11-15

    Situated in the central part of China, the Han River Basin is undergoing rapid social and economic development with some human interventions to be made soon which will profoundly influence the water environment of the basin. The integrated MIKE 11 model system comprising of a rainfall-runoff model (NAM), a non-point load evaluation model (LOAD), a hydrodynamic model (MIKE 11 HD) and a water quality model (ECOLab) was applied to investigate the impact of the Middle Route of the South-North Water Diversion Project on the Han River and the effectiveness of the 2 proposed mitigation projects, the 22 wastewater treatment plants (WWTPs) and the Yangtze-Han Water Diversion Project. The study concludes that business as usual will lead to a continuing rapid deterioration of the water quality of the Han River. Implementation of the Middle Route of the South-North Water Diversion Project in 2010 will bring disastrous consequence in the form of the remarkably elevated pollution level and high risk of algae bloom in the middle and lower reaches. The proposed WWTPs will merely lower the pollution level in the reach by around 10%, while the Yangtze-Han Water Diversion Project can significantly improve the water quality in the downstream 200-km reach. The results reveal that serious water quality problem will emerge in the middle reach between Xiangfan and Qianjiang in the future. Implementation of the South-North Water Diversion Project (phase II) in 2030 will further exacerbate the problem. In order to effectively improve the water quality of the Han River, it is suggested that nutrient removal processes should be adopted in the proposed WWTPs, and the pollution load from the non-point sources, especially the load from the upstream Henan Province, should be effectively controlled.

  18. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  19. Malheur River Basin cooperative bull trout/redband trout research project, annual report FY 1999; ANNUAL

    International Nuclear Information System (INIS)

    Schwabe, Lawrence; Tiley, Mark

    2000-01-01

    The purpose of this study is to document the seasonal distribution of adult/sub-adult bull trout (Salvelinus confluentus) in the Malheur River basin. Due to the decline of bull trout in the Columbia Basin, the United States Fish and Wildlife Service listed bull trout as a threatened species in June 1998. Past land management activities; construction of dams; and fish eradication projects in the North Fork and Middle Fork Malheur River by poisoning have worked in concert to cumulatively impact native species in the Malheur Basin (Bowers et. al. 1993). Survival of the remaining bull trout populations is severely threatened (Buchanan 1997). 1999 Research Objects are: (1) Document the migratory patterns of adult/sub-adult bull trout in the North Fork Malheur River; (2) Determine the seasonal bull trout use of Beulah Reservoir and bull trout entrainment; and (3) Timing and location of bull trout spawning in the North Fork Malheur River basin. The study area includes the Malheur basin from the mouth of the Malheur River located near Ontario, Oregon to the headwaters of the North Fork Malheur River (Map 1). All fish collected and most of the telemetry effort was done on the North Fork Malheur River subbasin (Map 2). Fish collection was conducted on the North Fork Malheur River at the tailwaters of Beulah Reservoir (RK 29), Beulah Reservoir (RK 29-RK 33), and in the North Fork Malheur River at Crane Crossing (RK 69) to the headwaters of the North Fork Malheur. Radio telemetry was done from the mouth of the Malheur River in Ontario, Oregon to the headwaters of the North Fork Malheur. This report will reflect all migration data collected from 3/1/99 to 12/31/99

  20. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  1. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R. Todd

    1993-04-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program Measure 704 (d) (1) 34.02 and targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation (hereafter referred to as Reservation) from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower 1/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River (downstream of the Meacham Creek confluence upstream to the Reservation East Boundary). In 1993, the project shifted emphasis to a comprehensive watershed approach consistent with other basin efforts and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. Maintenance of existing habitat improvement projects was included under this comprehensive approach. Maintenance of existing gravel traps, instream and bank stabilization structures was required within project areas during the reporting period due to spring flooding damage and high bedload movement. Maintenance activities were completed between river mile (RM) 0.0 and RM 0.25 Boston Canyon Creek, between RM 0.0 and RM 4 Meacham Creek and between RM 78.5 and RM 79 Umatilla River. Habitat enhancement areas were seeded with native grass, legume, shrub and wildflower mixes and planted with willow cuttings to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. Water quality monitoring continued for temperature and turbidity throughout the upper Umatilla River Watershed. Survey of cross sections and

  2. Settlement Yields Protection for Deerfield River from Highway Project Runoff

    Science.gov (United States)

    Both parties involved in a road and bridge construction project in Deerfield, Mass. have agreed to pay a total penalty of $21,600 to resolve claims by EPA that they violated their construction permit...

  3. HANFORD SITE RIVER PROTECTION PROJECT (RPP) TANK FARM CLOSURE

    International Nuclear Information System (INIS)

    JARAYSI, M.N.; SMITH, Z.; QUINTERO, R.; BURANDT, M.B.; HEWITT, W.

    2006-01-01

    The U. S. Department of Energy, Office of River Protection and the CH2M HILL Hanford Group, Inc. are responsible for the operations, cleanup, and closure activities at the Hanford Tank Farms. There are 177 tanks overall in the tank farms, 149 single-shell tanks (see Figure 1), and 28 double-shell tanks (see Figure 2). The single-shell tanks were constructed 40 to 60 years ago and all have exceeded their design life. The single-shell tanks do not meet Resource Conservation and Recovery Act of 1976 [1] requirements. Accordingly, radioactive waste is being retrieved from the single-shell tanks and transferred to double-shell tanks for storage prior to treatment through vitrification and disposal. Following retrieval of as much waste as is technically possible from the single-shell tanks, the Office of River Protection plans to close the single-shell tanks in accordance with the Hanford Federal Facility Agreement and Consent Order [2] and the Atomic Energy Act of 1954 [3] requirements. The double-shell tanks will remain in operation through much of the cleanup mission until sufficient waste has been treated such that the Office of River Protection can commence closing the double-shell tanks. At the current time, however, the focus is on retrieving waste and closing the single-shell tanks. The single-shell tanks are being managed and will be closed in accordance with the pertinent requirements in: Resource Conservation and Recovery Act of 1976 and its Washington State-authorized Dangerous Waste Regulations [4], US DOE Order 435.1 Radioactive Waste Management [5], the National Environmental Policy Act of 1969 [6], and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [7]. The Hanford Federal Facility Agreement and Consent Order, which is commonly referred to as the Tri-Party Agreement or TPA, was originally signed by Department of Energy, the State of Washington, and the U. S. Environmental Protection Agency in 1989. Meanwhile, the

  4. Control Strategies for Corridor Management

    Science.gov (United States)

    2016-06-28

    Integrated management of travel corridors comprising of freeways and adjacent arterial streets can potentially improve the performance of the highway facilities. However, several research gaps exist in data collection and performance measurement, ana...

  5. [Ecological and economic harmony evaluation and spatial evolution of the Hexi corridor, northwest China].

    Science.gov (United States)

    Liu, Hai-long; Shi, Pei-ji; Li, Sheng-mei; Tong, Hua-li; Nie, Xiao-ying; Wei, Wei

    2014-12-01

    The relationship between economic development and environment and the evolution characteristics of spatial pattern in Hexi Corridor of Northwest China were analyzed based on Landsat images in 1985, 1995, 2000 and 2011 with twenty counties in Hexi Corridor chosen as the basic research units. The ecological economic harmony during 1985-2011 was estimated according to ESV (ecosystem services value) and EEH (ecological and economic harmony) index with the ecosystem services value estimation methods. The results showed that the land type of the study area dramatically changed during the study period, the grassland decreased badly, and the construction land and cultivated land increased quickly. The ESV showed an overall downward trend, especially in the Shiyang River basin and the middle of Heihe River. The ESV in the Shule River basin in this period. After 2000, the economic growth speeded up visibly in the study area. The economic development concentrated in the resource-based cities and regional central cities, and declined from the center of corridor to the both sides. The ecological-economic relation in Hexi Corridor experienced a transformation of "preliminary deterioration--further deterioration--low grade coordination". The EEH had large changes in the Shiyang River basin and the middle of Heihe River, which experienced a transformation of "conflict--more conflicts--less conflicts", however, there was little change in Shule River basin. The development mode and the comprehensive reclamation of Shiyang River basin and Heihe River basin had a significant influence on the regional ecological and economic harmony.

  6. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  7. An Evaluation of the Science Education Component of the Cross River State Science and Technical Education Project

    Science.gov (United States)

    Ekuri, Emmanuel Etta

    2012-01-01

    The Cross River State Science and Technical Education Project was introduced in 1992 by edict number 9 of 20 December 1991, "Cross River State Science and Technical Education Board Edit, 20 December, 1991", with the aim of improving the quality of science teaching and learning in the state. As the success of the project depends…

  8. Kikori River basin project to sustain environment alongside development

    International Nuclear Information System (INIS)

    Price, J.B.; Power, A.P.; Henry, D.

    1994-01-01

    Protecting people and the environment is an essential design and operational criteria for the Kutubu Petroleum Development Project to minimize the physical, social and economic impacts on the local people and their environment in Papua New Guinea. This paper describes how Kutubu was implemented, and how World Wildlife Fund is assisting the neighboring communities to utilize their natural resources for long term benefit. The objectives and first year expectations of a three year integrated conservation and development project are identified, and the progress is summarized

  9. Socio-Economical, Environmental Evaluation of Ken-Betwa River Link Project, India

    OpenAIRE

    Pathak Hemant

    2016-01-01

    The India's ambitious Rs 9,393 crore Ken-Betwa river interlinking project will impact very significantly on Socio-economic life of two million people of Bundelkhand region, India. Water is an important input for survival and sustenance of life. The demand of this natural gift has been increasing exponentially. This ambitious project will help us in irrigation, potable water, cheap transportation, electricity as well as a source of livelihood for our ever increasing population. In Bundelkhand ...

  10. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Science.gov (United States)

    2013-08-09

    ... DEPARTMENT OF ENERGY [OE Docket No. PP-387] Application for Presidential Permit; Soule River Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery...

  11. 77 FR 47058 - Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft...

    Science.gov (United States)

    2012-08-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-2079-069--CA] Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft Environmental Impact Statement; Public Meetings a. Date and Time of Meetings: Tuesday, August 28, 2012, from 9:00 a.m. to 11:00 a.m. and...

  12. Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling and Testing

    Energy Technology Data Exchange (ETDEWEB)

    Henkle, William R.; Ronne, Joel

    2008-06-15

    This report covers the drilling and testing of the slim well 56-4 at the Reese River Geothermal Project in Lander County, Nevada. This well was partially funded through a GRED III Cooperative Funding Agreement # DE-FC36-04GO14344, from USDOE.

  13. Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

    2008-04-25

    Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

  14. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Science.gov (United States)

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG11-115-000, EG11-116-000...

  15. The Kings River Sustainable Forest Ecosystems Project: inception, objectives, and progress

    Science.gov (United States)

    Jared Verner; Mark T. Smith

    2002-01-01

    The Kings River Sustainable Forest Ecosystems Project, a formal administrative study involving extensive and intensive collaboration between Forest Service managers and researchers, is a response to changes in the agency’s orientation in favor of ecosystem approaches and to recent concern over issues associated with maintenance of late successional forest attributes...

  16. [Effect of water conservancy schistosomiasis control projects combined with molluscicide to control Oncomelania hupensis snails in rivers connecting with Yangtze River in Pukou District, Nanjing City].

    Science.gov (United States)

    Qiang, Zhou; Li-Xin, Wan; De-Rong, Hang; Qi-Hui, You; Jun, You; Yu-Lin, Zhang; Zhao-Feng, Zhu; Yi-Xin, Huang

    2017-12-07

    To evaluate the effect of the water conservancy schistosomiasis control projects combined with molluscicide to control Oncomelania hupensis snails in the rivers connecting with the Yangtze River. The water conservancy schistosomiasis control projects of Zhujiashan River, Qili River and Gaowang River were chosen as the study objects in Pukou District, Nanjing City. The data review method and field investigation were used to evaluate the effect of the water conservancy schistosomiasis control projects combined with molluscicide to control O. hupensis snails. After the projects of the water level control and concrete slope protection and mollusciciding were implemented, the snails in the project river sections were completely eliminated. The snail diffusion did not happen in the inland irrigation area too. In the outside of the river beach, though the snails still existed, the snail densities plunged below 1.0 snail per 1.0 m 2 . The comprehensive measures of the combination of water level control, concrete slope protection and mollusciciding can effectively control and eliminate the snails, and prevent the snails from spreading.

  17. South Asia river flow projections and their implications for water resources

    Science.gov (United States)

    Mathison, C.; Wiltshire, A. J.; Falloon, P.; Challinor, A. J.

    2015-06-01

    South Asia is a region with a large and rising population and a high dependance on industries sensitive to water resource such as agriculture. The climate is hugely variable with the region relying on both the Asian Summer Monsoon (ASM) and glaciers for its supply of fresh water. In recent years, changes in the ASM, fears over the rapid retreat of glaciers and the increasing demand for water resources for domestic and industrial use, have caused concern over the reliability of water resources both in the present day and future for this region. The climate of South Asia means it is one of the most irrigated agricultural regions in the world, therefore pressures on water resource affecting the availability of water for irrigation could adversely affect crop yields and therefore food production. In this paper we present the first 25 km resolution regional climate projections of river flow for the South Asia region. ERA-Interim, together with two global climate models (GCMs), which represent the present day processes, particularly the monsoon, reasonably well are downscaled using a regional climate model (RCM) for the periods; 1990-2006 for ERA-Interim and 1960-2100 for the two GCMs. The RCM river flow is routed using a river-routing model to allow analysis of present day and future river flows through comparison with river gauge observations, where available. In this analysis we compare the river flow rate for 12 gauges selected to represent the largest river basins for this region; Ganges, Indus and Brahmaputra basins and characterize the changing conditions from east to west across the Himalayan arc. Observations of precipitation and runoff in this region have large or unknown uncertainties, are short in length or are outside the simulation period, hindering model development and validation designed to improve understanding of the water cycle for this region. In the absence of robust observations for South Asia, a downscaled ERA-Interim RCM simulation provides a

  18. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  19. Small mammal populations in a restored stream corridor

    International Nuclear Information System (INIS)

    Wike, L.D.

    2000-01-01

    An opportunity to study the response of a small mammal community to restoration of a riparian wetland was provided by the Pen Branch project at the Savannah River Site (SRS). Live trapping of small mammals was conducted on six transects at Pen Branch in 1996 and 1998 and at three transects at Meyer's Branch, an unimpacted stream at SRS, in 1997 and 1998. Distributions of rates of capture of the four most common species were both spatially and temporally uneven. Kruskal-Wallis one-way analysis of variance found no significant differences in the relationship of capture rates between species and between treatment and both the within-stream control and Meyers Branch. Habitat use and movement within stream corridors appears to be dependent primarily on species, with age and sex perhaps contributing to preference and distance moved. The lack of differences in capture rates related to transect or treatment may be due to the close proximity of sample transects relative to the movement potential of the species sampled

  20. McArthur River project - the future of Key Lake

    International Nuclear Information System (INIS)

    Spross, J.

    1994-01-01

    The Key Lake mill has operated since the fall of 1983. The ore from both Key Lake open pits will be depleted by 1997. It is planned to use this mill, located about 60 km southwest of McArthur, to process the McArthur River ore. While the geological data collected so far on the McArthur deposit are encouraging, more information of the deposit is needed before any detailed mine planning can begin. The surface drilling program identified the orebody and provided information on the geomechanical and hydrological properties of the overlying sandstone. It was proposed to conduct an underground exploration program to further delineate the orebody. This was approved following a public hearing and review process. This program involves the sinking of a 630 metre deep shaft and the driving of one or two drifts along a portion of the orebody. From these drifts, exploration drilling every 10 m to 15 m through the orebody will provide the information required for the preparation of a feasibility study and an Environmental Impact Statement (EIS). (author). 4 refs., 8 figs

  1. Backgrounder : 1998 historic resources overview assessment, Churchill River power project

    International Nuclear Information System (INIS)

    1999-01-01

    A survey was conducted to gather information regarding the history of land-use of the Innu Nation of Labrador. The survey was made possible through research into land use and documentary sources plus the analysis of geomorphologic features and air photos. The areas of the survey included portions of the Strait of Belle Isle, Churchill Valley, proposed transmission routes of the Churchill Power Project, and survey lines at Atikonak Lake. Over 65 historical and traditional land-use sites were recorded, including two major Hudson Bay Company fur-trading posts in the Churchill Valley. This survey will be important in helping to ensure that important sites are not destroyed as a result of the proposed Churchill Power Project

  2. Browns project: an opportunity for the Finniss River

    International Nuclear Information System (INIS)

    Elvish, R.D.

    2002-01-01

    Compass Resources NL is evaluating The Brown Project that contains large undeveloped mineral resources with 82 million tonnes of identified resources containing 1.9 million tonnes of lead, 98,000 tonnes of cobalt, 614,000 tonnes of copper, along with nickel, silver and zinc. A table outlines the resources quoted in the Compass Resources' 2000 Annual Report. The project is immediately along strike from the former Rum Jungle operations. The company is committed to apply waste management strategies for acid rock drainage from day one. Alternatives being considered include encapsulate and seal, treatment and control, blend acid generating rock with acid consuming rock, and a combination of these. Indicative water balance considerations include a surplus during the wet season and a requirement for water during the dry season

  3. Tijuana River Flood Control Project, San Diego County, California.

    Science.gov (United States)

    1976-05-20

    presence of historical and archeological resoureces in the proposed project area. His letter of August 1, 1973 (see appendix) indicated that no state... human misery among those directly affected. Those impacts will be pert of the permanent and disastrous legacy of the "Recommended Plan" (Alternative Ill...of citizens; and general human misery among those directly affected. Those impacts will be part of the permanent and disastrous legacy of the

  4. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  5. Socio-Economical, Environmental Evaluation of Ken-Betwa River Link Project, India

    Directory of Open Access Journals (Sweden)

    Pathak Hemant

    2016-10-01

    Full Text Available The India's ambitious Rs 9,393 crore Ken-Betwa river interlinking project will impact very significantly on Socio-economic life of two million people of Bundelkhand region, India. Water is an important input for survival and sustenance of life. The demand of this natural gift has been increasing exponentially. This ambitious project will help us in irrigation, potable water, cheap transportation, electricity as well as a source of livelihood for our ever increasing population. In Bundelkhand region, there is a severe problem of lack of irrigation in one region and water logging in others. Damage to crops due to drought and pitiable drainage facility could be managed. The objectives of the paper are to study socio-economical issues and environmental challenges in Ken-Betwa River link in India and to study environmental impact of this Project.

  6. Cooper River Rediversion Project. Lake Moultrie and Santee River, South Carolina. Intake and Tailrace Canals.

    Science.gov (United States)

    1976-06-01

    0 COM’PLE’t 01 No N’-tcRO~TATIC. ŘLAD F.0Uv4DATlON4 PRevuRr- + L. *I. .;Appko/%C-NH 5. oo *PS f~ ;:.. .~0NlION -FULL 14’lC7, AULIC . WILAD . 7A IL W...Data 3 1 HYDROLOGY Basin Description 4 l Topography 6 2 Stream Characteristics 7 2 Climate 8 2 Precipitation 9 2 Storms of Record 10 3 Runoff and...swampy areas as they reach the Coastal Plain. Slopes of the rivers in the Coastal Plain Province average about 0.6 foot per mile. 6. Climate . The Santee

  7. Umatilla River subbasin fish habitat improvement project. Annual report 1993

    International Nuclear Information System (INIS)

    Bailey, T.D.; Laws, T.S.

    1994-05-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: (1) procurement of one access easement with a private landowner, (2) design, layout, and implementation of 3.36 miles of instream structure maintenance, (3) inspection and routine maintenance of 15.1 miles of fence, (4) revegetation along 3.36 miles of stream, (5) collection and summarization of physical and biological monitoring data, (6) extensive interagency coordination, and (7) environmental education activities with local high school students

  8. The Tibagi river and representations: a water controversy and development of Tibagi Project(1970 - 2000

    Directory of Open Access Journals (Sweden)

    Eliane Aparecida Biasetto

    2014-12-01

    Full Text Available The river Tibagi from the city of Londrina, in the years 1970 and 1980 was a subject of much discussion and controversy due to the project of raising its waters to supply the population of the cities of Londrina and region. In articles published in newspapers, especially in the Folha de Londrina, in the 1970s and 1980s, it was identified that, this time, the perception emerged that the river was polluted. Thus, our primary goal in the first part of this research is to investigate how it came to creating this image. Therefore, we used a collection of newspaper clippings about the controversy raised from the waters Tibagi and interviews with Nelson Amanthea civil engineer and agronomist Marcos Antonio Castanheira, both participated in discussions on the project. It was in this period that the ideas of ecology was entered and began to circulate in the city in the late 1970s. In this context, the emergence of the "age of ecology”, allegations and actions to combat pollution started to become more effective and broad, as well as, arose environmental associations, specialized government agencies and specific legislation. Thus, the objective of this research is also investigating the involvement of scientists and institutions in environmental issues through research of river Tibagi that became evident in the late 1980 and early next decade when the University State of Londrina initiated research in Tibagi river basin. Is emphasized the participation of members of the Department of Animal Biology and Plant - UEL, the company Klabin Pulp and Paper, Telêmaco Borba - PR and COPATI - Intermunicipal Consortium of Tibagi Basin, projects and actions in order to promote their recovery. A major action was investigated Project “Appearance of  Fauna and Flora River Tibagi” which became known as “Project Tibagi “. In this sense sought to investigate the origins of the project, the main participants involved, their development, search results, the

  9. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    International Nuclear Information System (INIS)

    2005-01-01

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  10. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Project Integration

    2005-09-26

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  11. Changes in Projected Spatial and Seasonal Groundwater Recharge in the Upper Colorado River Basin.

    Science.gov (United States)

    Tillman, Fred D; Gangopadhyay, Subhrendu; Pruitt, Tom

    2017-07-01

    The Colorado River is an important source of water in the western United States, supplying the needs of more than 38 million people in the United States and Mexico. Groundwater discharge to streams has been shown to be a critical component of streamflow in the Upper Colorado River Basin (UCRB), particularly during low-flow periods. Understanding impacts on groundwater in the basin from projected climate change will assist water managers in the region in planning for potential changes in the river and groundwater system. A previous study on changes in basin-wide groundwater recharge in the UCRB under projected climate change found substantial increases in temperature, moderate increases in precipitation, and mostly periods of stable or slight increases in simulated groundwater recharge through 2099. This study quantifies projected spatial and seasonal changes in groundwater recharge within the UCRB from recent historical (1950 to 2015) through future (2016 to 2099) time periods, using a distributed-parameter groundwater recharge model with downscaled climate data from 97 Coupled Model Intercomparison Project Phase 5 (CMIP5) climate projections. Simulation results indicate that projected increases in basin-wide recharge of up to 15% are not distributed uniformly within the basin or throughout the year. Northernmost subregions within the UCRB are projected an increase in groundwater recharge, while recharge in other mainly southern subregions will decline. Seasonal changes in recharge also are projected within the UCRB, with decreases of 50% or more in summer months and increases of 50% or more in winter months for all subregions, and increases of 10% or more in spring months for many subregions. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  12. Hydroelectric development project of the Magpie dam on the Magpie River: Investigation and public hearing report

    International Nuclear Information System (INIS)

    Harvey, A.; Journault, C.

    2004-08-01

    Public hearings were held by Quebec's Bureau d'audiences publiques sur l'environnement (BAPE) concerning a proposed hydroelectric development project on the Magpie River in Quebec's Minganie Region. The proposed hydroelectric power plant is to be developed and managed by Hydromega Services Inc. and constructed by Aecon Group Ltd. The project consists of reconstructing a power plant and dam at an existing site that was constructed in 1961 but which has been decommissioned since 1989. The installed capacity of the proposed power plant is 40.6 MW. The drop height for the dam is 21.25 metres. The issues that were addressed during the hearings included the opinions and suggestion of the participants regarding energy provisions, regional development and ecological protection. One of the main concerns facing this project is the loss of spectacular rapids currently used by rafters. The Commission noted that the rapids cannot be saved without significant modification to the design of the project. However, the flooding associated with the project would facilitate fishermen, canoeists and kayakers, thereby preserving the recreational and tourism attributes of the Magpie River. The Commission also noted that the local economic repercussions of the project would benefit the population of the Minganie Region which has a high unemployment rate. Any ecological impacts may be controlled by relevant attenuation measures and follow-up. It was concluded that the proposed project could contribute modestly to meeting the anticipated growth in energy demand in Quebec. refs., figs

  13. 75 FR 57548 - Environmental Impact Statement: U.S. 64/Corridor K. The Project Begins on U.S. 64 From West of...

    Science.gov (United States)

    2010-09-21

    ... that an Environmental Impact Statement (EIS) will be prepared for a proposed highway project in Polk County, Tennessee. FOR FURTHER INFORMATION CONTACT: Mr. Charles J. O'Neill, Planning and Program..., Suite 508, Nashville, Tennessee 37217, Telephone: (615) 781-5770, E-mail: Charles[email protected

  14. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  15. Comprehensive highway corridor planning with sustainability indicators.

    Science.gov (United States)

    2011-10-01

    "The Maryland State Highway Administration (SHA) has initiated major planning efforts to improve transportation : efficiency, safety, and sustainability on critical highway corridors through its Comprehensive Highway Corridor : (CHC) program. This pr...

  16. Effective strategies for comprehensive corridor management

    Science.gov (United States)

    2004-10-01

    Despite the increasing importance of comprehensive corridor management at the state and local government level, questions remain regarding effective methods for developing and implementing corridor management plans. Further insight is also needed int...

  17. A light-water detritiation project at Chalk River Laboratories

    International Nuclear Information System (INIS)

    Boniface, H.A.; Castillo, I.; Everatt, A.E.; Ryland, D.K.

    2010-01-01

    The NRU reactor rod bays is a large, open pool of water that receives hundreds of fuel rods annually, each carrying a small amount of residual tritiated heavy water. The tritium concentration of the rod bays water has risen over the years, to a level that is of concern to the operations staff and to the environment. The proposed long-term solution is to reduce the rod bays tritium concentration by direct detritiation of the water. The Combined Electrolytic-Catalytic Exchange (CECE) process is well suited to the light-water detritiation problem. With a tritium-protium separation factor greater than five, a CECE detritiation process can easily achieve the eight orders of magnitude separation required to split a tritiated light-water feed into an essentially tritium-free effluent stream and a tritiated heavy water product suitable for recycling through a heavy water upgrader. This paper describes a CECE light-water detritiation process specifically designed to reduce the tritium concentration in the NRU rod bays to an acceptable level. The conceptual design of a 600 Mg/a detritiation process has been developed and is now at the stage of project review and the beginning of detailed design. (author)

  18. Development of Joint Climate and Discharge Projections for the International Rhine River Basin - the CHR RheinBlick2050 Project

    Science.gov (United States)

    Görgen, K.; Pfister, L.

    2008-12-01

    The anticipated climate change will lead to modified hydro-meteorological regimes that influence discharge behaviour and hydraulics of rivers. This has variable impacts on managed (anthropogenic) and unmanaged (natural) systems, depending on their sensitivity and vulnerability (ecology, economy, infrastructure, transport, energy production, water management, etc.). Decision makers in these contexts need adequate adaptation strategies to minimize adverse effects of climate change, i.e. an improved knowledge on the potential impacts including uncertainties means an extension of the informed options open to users. The goal of the highly applied study presented here is the development of joint, consistent climate and discharge projections for the international Rhine River catchments (Switzerland, France, Germany, Netherlands) in order to assess future changes of hydro-meteorological regimes in the meso- and macroscale Rhine River catchments and to derive and improve the understanding of such impacts on hydrologic and hydraulic processes. The RheinBlick2050 project is an international effort initiated by the International Commission for the Hydrology of the Rhine Basin (CHR) in close cooperation with the International Commission for the Protection of the Rhine. The core experiment design foresees a data-synthesis, multi-model approach where (transient) (bias- corrected) regional climate change projections are used as forcing data for existing calibrated hydrological (and hydraulic) models at a daily temporal resolution over mesoscale catchments of the Rhine River. Mainly for validation purposes, hydro-meteorological observations from national weather services are compiled into a new consistent 5 km x 5 km reference dataset from 1961 to 2005. RCM data are mainly used from the ENSEMBLES project and other existing dynamical downscaling model runs to derive probabilistic ensembles and thereby also access uncertainties on a regional scale. A benchmarking is helping to

  19. Integrated corridor management initiative : demonstration phase evaluation, San Diego air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...

  20. New strategies for maintaining post-seismic operations of lifeline corridors.

    Science.gov (United States)

    2014-10-01

    This project furthered the development of three strategies that could positively impact maintaining post-seismic operations of lifeline corridors. In Year 1, most of the focus : was on the development of the three individual strategies. In Year 2, a ...

  1. Multi-Modal Traveler Information System - GCM Corridor Architecture Interface Control Requirements

    Science.gov (United States)

    1997-10-31

    The Multi-Modal Traveler Information System (MMTIS) project involves a large number of Intelligent Transportation System (ITS) related tasks. It involves research of all ITS initiatives in the Gary-Chicago-Milwaukee (GCM) Corridor which are currently...

  2. Multi-Modal Traveler Information System - GCM Corridor Architecture Functional Requirements

    Science.gov (United States)

    1997-11-17

    The Multi-Modal Traveler Information System (MMTIS) project involves a large number of Intelligent Transportation System (ITS) related tasks. It involves research of all ITS initiatives in the Gary-Chicago-Milwaukee (GCM) Corridor which are currently...

  3. Assessing segment- and corridor-based travel-time reliability on urban freeways : final report.

    Science.gov (United States)

    2016-09-01

    Travel time and its reliability are intuitive performance measures for freeway traffic operations. The objective of this project was to quantify segment-based and corridor-based travel time reliability measures on urban freeways. To achieve this obje...

  4. John Day River Subbasin Fish Habitat Enhancement Project, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Russ M.; Delano, Kenneth H.; Jerome, James P.

    2002-07-01

    Work undertaken in 2001 included: (1) 3335 structure posts were pounded on six new projects thereby protecting 10 miles of stream (2) Completion of 1000 ft. of barbed wire fence and one watergap on the Middle Fork of the John Day River/ Forrest property. (3) Fence removal of 5010 ft. of barbed wire fence on the Meredith project. (4) Maintenance of all active project fences (66 miles), watergaps (76), spring developments (32) and plantings were checked and repairs performed. (5) Since the initiation of the Fish Habitat Project in 1984 we have 63.74 miles of stream protected using 106.78 miles of fence. With the addition of the Restoration and Enhancement Projects we have 180.64 miles of fence protecting 120.6 miles of stream.

  5. The international project of radiation and hydrochemical investigation and monitoring of general Caspian rivers

    International Nuclear Information System (INIS)

    Passell, H.D.; Barber, D.S.; Kadyrzhanov, K.K; Solodukhin, V.P.; Chernykh, E.E.; Arutyunyan, R.V.; Valyaev, A.N.; Kadik, A.A.; Stepanetts, O.V; Vernadsky, V.I.; Alizade, A.A.; Gutiev, I.S.; Mamedov, R.F.; Nadareishvili, K.S.; Chkhartishvili, A.G.; Tsitskishvili, M.S.; Chubaryan, E. V; Gevorgyan, R.G.; Puskyulyan, K.I.

    2005-01-01

    Full text: The scientific community of six countries (USA, Kazakhstan, Russia, Georgia, Armenia, and Azerbaijan) has developed the ecological project 'Joint International Researches and Creation of the General System of Radiation and Hydro-chemical Monitoring of Rivers of the Caspian Sea Basin.' The purpose of this project is to investigate and characterized contamination by radionuclides and toxic and chemically hazardous elements and create a valid system of radiation and hydro-chemical monitoring of the main river basins of the Caspian region: the Volga, Ural, Emba and Kura. The basins of these rivers cover large parts of Europe and Asia, including parts of Russia, West Kazakhstan and the South Caucasus and including territories of Georgia, Armenia and Azerbaijan. The total area of the basins of these rivers exceeds combined area of such large European states as France, Spain and Germany, and comprises 1631 sq. km. All these rivers are the main life-supporting water arteries for the region's inhabitants, a population that comprises tens of millions of people Also, the outlets of these rivers determine the condition of the aquatic environment of the Caspian Sea. The ecological condition of the aquatic environment of all the rivers of the Caspian Sea is to a great extent due to contamination, the main components of which are anthropogenic radioactive elements, heavy metals and oil products. At present, information about contamination levels of these rivers is not known and is occasionally contradictory. In this connection there is an obvious need of qualified investigation of contamination levels and its character in the basins of these rivers and in creating a common monitoring system to assess the quality of the aquatic environment. The present project is devoted to this matter. 1. The project provides for the following main tasks: 1. Wide-ranging investigation of the level and character of contamination by radionuclides and toxic elements of the river basins

  6. Carmel River Lagoon Enhancement Project: Water Quality and Aquatic Wildlife Monitoring, 2006-7

    OpenAIRE

    Perry, William; Watson, Fred; Casagrande, Joel; Hanley, Charles

    2007-01-01

    This is a report to the California Department of Parks and Recreation. It describes water quality and aquatic invertebrate monitoring after the construction of the Carmel River Lagoon Enhancement Project. Included are data that have been collected for two years and preliminary assessment of the enhanced ecosystem. This report marks the completion of 3-years of monitoring water quality and aquatic habitat. The report adopts the same format and certain background text from previous ...

  7. Proposal to market Provo River Project power, Salt Lake City area

    International Nuclear Information System (INIS)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations's proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations

  8. Columbia River pathway report: phase I of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab.

  9. Dynamics of participation and supply of services in the Hood River Conservation Project

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; Goeltz, R.

    1986-07-01

    The Hood River Conservation Project (HRCP) is a major residential retrofit demonstration project. HRCP is funded by the Bonneville Power Administration (BPA) and run by Pacific Power and Light Company. The project was conducted in the community of Hood River, Oregon, will cost $21 million, and will last for three years (mid-1983 through 1986). Installation of applicable retrofit measures was completed by the end of 1985; data collection, analysis, and report writing will continue through 1986. This report documents the extent to which households participated in HRCP. Differences between participants and eligible nonparticipants are examined. Similarly, differences among participants as a function of when they signed up for HRCP are analyzed. The report also examines the dynamics of program services (i.e., times between audit requests and audit, and between audit and installation of measures). These analyses are based on data from the roughly 3500 Hood River homes eligible for HRCP, 3189 of which received free home energy audits and 2988 of which received HRCP-financed retrofit measures.

  10. Hydroelectric construction project on the Sheldrake River at Riviere-au-Tonnerre : public inquiry report

    International Nuclear Information System (INIS)

    2009-09-01

    The Societe d'Energie Riviere Sheldrake Inc. has proposed the construction of a hydroelectric facility on the Sheldrake River at Riviere-au-Tonnerre in the regional municipality of Minganie in Quebec. The project involves the construction of a headrace canal, intake, tunnel, powerhouse, access roads, electrical transmission line, spillway, weir and a bridge over the Sheldrake River. The proposed development was subject to an environmental evaluation process and public consultation. Quebec's environmental public hearing board held a public hearing on the draft development of the project to hear the concerns and views of the public and stakeholders. The hearing focused on a number issues, such as reasons for the project, its location and socio-economic impacts. The cumulative environmental effects of the project were also examined. The primary concerns were the economic repercussions of the project and its effect on tourism and fish, including salmon. The Board determined that the project would create jobs in a region affected by unemployment and the decay of its municipalities and that it would stimulate the local and regional economy. However, the Board determined that changes to the project are required to minimize impacts on the natural environment. The project proponent must monitor instream flows to ensure that fish passage facilities meet regulations. In addition, since the proposed project crosses 3 bogs, the developer must compensate for lost wetlands. A 10-year follow-up is required to assess the recovery of these environments. The developer must also maintain the aesthetic quality of the Courbe du Sault Falls in order to maintain the eco-tourism in the region. refs., figs.

  11. Comprehensive report to Congress Clean Coal Technology Program. Four Rivers Energy Modernization Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    One of the five projects selected for funding within the Clean Coal Technology Program is a project proposed by Air Products and Chemicals, Inc. (APCI) of Allentown, Pennsylvania. APCI requested financial assistance from DOE for the design, construction, and operation of a 95 megawatt-electric (MWe) gross equivalent, second generation, pressurized, circulating fluidized bed (PCFB) combustor cogeneration facility. The project, named the Four Rivers Energy Modernization Project, is co be located adjacent to an existing APCI chemicals manufacturing facility in Calvert City, Kentucky. Four Rivers Energy Partners, L.P. (FREP), will execute the project. The demonstration plant will produce approximately 70 MWe for the utility grid and an average of 310,000 pounds per hour of process steam for the chemicals manufacturing facility. The project, including the demonstration phase, will last 80 months at a total cost of $360,707,500. DOE`s share of the project cost will be 39.5 percent, or $142,460,000. The objective of the proposed project is to demonstrate a second generation PCFB system based on technology being supplied by Foster Wheeler Energy Corporation (FWEC), Westinghouse Electric Corporation (Westinghouse), and LLB Lurgi Lentjes Babcock Energietechnik GmbH (LLB). The integrated performance to be demonstrated will involve all of the process systems, including coal preparation and feed, sorbent feed, carbonizer, char transfer, PCFB combustor, carbonizer and combustor hot-gas filtration, carbonizer and combustor alkali removal, topping combustor, gas turbine-generator, heat recovery steam generator (HRSG), steam turbine-generator, and balance-of-plant systems. The project will utilize Western Kentucky and Southern Illinois bituminous coal.

  12. Evaluation on uncertainty sources in projecting hydrological changes over the Xijiang River basin in South China

    Science.gov (United States)

    Yuan, Fei; Zhao, Chongxu; Jiang, Yong; Ren, Liliang; Shan, Hongcui; Zhang, Limin; Zhu, Yonghua; Chen, Tao; Jiang, Shanhu; Yang, Xiaoli; Shen, Hongren

    2017-11-01

    Projections of hydrological changes are associated with large uncertainties from different sources, which should be quantified for an effective implementation of water management policies adaptive to future climate change. In this study, a modeling chain framework to project future hydrological changes and the associated uncertainties in the Xijiang River basin, South China, was established. The framework consists of three emission scenarios (ESs), four climate models (CMs), four statistical downscaling (SD) methods, four hydrological modeling (HM) schemes, and four probability distributions (PDs) for extreme flow frequency analyses. Direct variance method was adopted to analyze the manner by which uncertainty sources such as ES, CM, SD, and HM affect the estimates of future evapotranspiration (ET) and streamflow, and to quantify the uncertainties of PDs in future flood and drought risk assessment. Results show that ES is one of the least important uncertainty sources in most situations. CM, in general, is the dominant uncertainty source for the projections of monthly ET and monthly streamflow during most of the annual cycle, daily streamflow below the 99.6% quantile level, and extreme low flow. SD is the most predominant uncertainty source in the projections of extreme high flow, and has a considerable percentage of uncertainty contribution in monthly streamflow projections in July-September. The effects of SD in other cases are negligible. HM is a non-ignorable uncertainty source that has the potential to produce much larger uncertainties for the projections of low flow and ET in warm and wet seasons than for the projections of high flow. PD contributes a larger percentage of uncertainty in extreme flood projections than it does in extreme low flow estimates. Despite the large uncertainties in hydrological projections, this work found that future extreme low flow would undergo a considerable reduction, and a noticeable increase in drought risk in the Xijiang

  13. 78 FR 1246 - Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the...

    Science.gov (United States)

    2013-01-08

    ...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  14. 76 FR 70480 - Otay River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National...

    Science.gov (United States)

    2011-11-14

    ... River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife...), intend to prepare an environmental impact statement (EIS) for the proposed Otay River Estuary Restoration... any one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  15. Quality assurance in technology development for The Clinch River Breeder Reactor Plant Project

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1980-01-01

    The Clinch River Breeder Reactor Plant Project is the nation's first large-scale demonstration of the Liquid Metal Fast Breeder Reactor (LMFBR) concept. The Project has established an overall program of plans and actions to assure that the plant will perform as required. The program has been established and is being implemented in accordance with Department of Energy Standard RDT F 2-2. It is being applied to all parts of the plant, including the development of technology supporting its design and licensing activity. A discussion of the program as it is applied to development is presented

  16. The Reaches Project : Ecological and Geomorphic Dtudies Supporting Normative Flows in the Yakima River Basin, Washington, Final Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Stanford, Jack A.; Lorang, Mark N.; Matson, Phillip L. (University of Montana, Flathead Lake Biological Station, Poison, MT)

    2002-10-01

    stem and ocean bottlenecks are not overriding, restoration of floodplain connectivity by elevating base flows throughout the corridor, removing revetments and refilling gravel pits by natural riverine transport of gravel where possible could be successful in substantially enhancing Yakima salmon and steelhead runs. Hence, the overarching purpose of this research was to determine the ecology of major floodplain reaches of the Yakima River: Cle Elum, Kittitas, Naches, Union Gap and Wapato. Specifically, the study documented groundwater-channel connectivity and flow relations; use and quality of side channel and other floodplain habitats by salmonid fishes; and classification and analysis of floodplain habitat using remote sensing and documentation of geomorphic processes, required for a robust understanding of the feasibility of revetment removal and establishment of a normative flow regime for the mainstem river.

  17. Lake Darling Flood Control Project, Souris River, North Dakota. General Project Design.

    Science.gov (United States)

    1983-06-01

    difference between the air temperature measured at 10 feet and snow surface temperature. Td ’ - is the difference between dewpoint temperature measured at 10...to atmospheric conditions in the river reach between the outlet of the dam and the gage. f. Total dissolved solids ( TDS ) are generally considered to be...C c o o c a m m o i p - g - *tm-ett 41JI IhcaU ICI (U 4 ) flU)WwooQ- flJ ~rVlrnj M W Nfr- r- 0 r- M WMM - I# )-z .Lr n LZ n Lrr r 4r 111

  18. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  19. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  20. Runoff projection under climate change over Yarlung Zangbo River, Southwest China

    Science.gov (United States)

    Xuan, Weidong; Xu, Yue-Ping

    2017-04-01

    The Yarlung Zangbo River is located in southwest of China, one of the major source of "Asian water tower". The river has great hydropower potential and provides vital water resource for local and downstream agricultural production and livestock husbandry. Compared to its drainage area, gauge observation is sometimes not enough for good hydrological modeling in order to project future runoff. In this study, we employ a semi-distributed hydrologic model SWAT to simulate hydrological process of the river with rainfall observation and TRMM 3B4V7 respectively and the hydrological model performance is evaluated based on not only total runoff but snowmelt, precipitation and groundwater components. Firstly, calibration and validation of the hydrological model are executed to find behavioral parameter sets for both gauge observation and TRMM data respectively. Then, behavioral parameter sets with diverse efficiency coefficient (NS) values are selected and corresponding runoff components are analyzed. Robust parameter sets are further employed in SWAT coupled with CMIP5 GCMs to project future runoff. The final results show that precipitation is the dominating contributor nearly all year around, while snowmelt and groundwater are important in the summer and winter alternatively. Also sufficient robust parameter sets help reduce uncertainty in hydrological modeling. Finally, future possible runoff changes will have major consequences for water and flood security.

  1. Assessment of restoration measures efficiency for soil contamination in Mediterranean Ecosystem. The case study of Guadiamar Green Corridor in the context of RECARE project

    Science.gov (United States)

    Anaya-Romero, Maria; José Blanco-Velázquez, Francisco; Muñoz-Vallés, Sara

    2017-04-01

    Restoration of soil ecosystems contaminated by heavy metals requires their characterization and the assessment of measures for risk reduction. Particular soil traits and history define different levels of resilience, so soil contamination assessment needs to take into account a site-by-site approach, which considers both the particular environmental characteristics of soils and the human activities. Nevertheless, current approaches for soil contamination assessment developed as academy and market solutions continue to be rather qualitative, and they do not allow as far the selection of efficient remediation measures to solve soil contamination at the long-term and extensively over larger áreas. In this context, under the framework of RECARE (Preventing and Remediating degradation of Soils in Europe through Land Care) project, we are designing a Decision Support System (DSS) which automatically assess soil contamination values by heavy metals in the topsoil and evaluate the efficiency of soil remediation measures under scenarios of climate and land-use change. The DSS works by simulating the spatio-temporal efficiency of three widely applied remediation measures (compost, sugar beet lime and iron-rich clayey materials). Input variables are divided into: (I) climate variables (mainly precipitation and temperature), (II) site variables (elevation, slope and erodibility), (III) soil (heavy metal content, pH, sand/clay content, soil organic carbon and bulk density), (IV) land use and (V) remediation measures. The predictor variables are related to soil functions expressed by % of change of heavy metal content (Currently the DSS consider cadmium dynamics due to the worldwide distribution in agricultural system and toxicity impact on health and plants), soil carbon and erosion dynamics. The pilot study area is the Guadiamar valley (SW Spain) where the main threat is soil contamination, after a mine spill occurred on April 1998. Since that time, a huge soil databse of

  2. "Projeto Rios" (Rivers Project) a methodology of classroom of the future (northern Portugal)

    Science.gov (United States)

    Almeida, Ana

    2013-04-01

    The rivers and the surrounding land drained by them are very important wildlife habitats. The water itself provides the environment for plants and animals, while the banks and nearby land support creatures such as otters, water lizards, dragonflies and a variety of water-loving plants. Using a different teaching strategy, on the latest three years, students of the eighth grade of the EB 2.3 Agrela school have been implementing the project "Nós e o Leça" (We and the river Leça). This initiative is part of a nationwide project in Portugal, the "Projeto Rios", which is a tool that aims the adoption and monitoring of a 500 meter river section, promoting society's awareness for the problems and the need of protection and recovery of the riparian systems. These students adopted a section of the Leça River, which is the one that is passing nearby our school. Throughout the mentioned school years, the children made field trips for characterization, knowledge and observation of some happenings on the section adopted, with the aid of a complete kit of materials (galoshes, loupes, tweezers, trays, fishnets, tape measure, tape of pH...). Token fields for identifications of plants and animals and specific data sheets/questionnaires, were also used and fulfilled. While in the river, it is done the collection of macro invertebrates to conclude about the water quality of the section under study. Youth also detect disturbances in the balance of the riverine ecosystem, either naturally occurring or of human origin. Aiming the sustained development and the citizenship education, the students performed a final action for improvement, which consisted in the uprooting of an invasive plant, in this case "the herb-of-fortune" and also gathering the "trash" founded along the adopted stretch of the river. Back to the classroom, we selected photographs and the collected data is treated and discussed to produce information (summaries, reports, tables, charts,...) which will be published

  3. Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.; Kline, Paul A.

    2008-12-17

    Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangered under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and

  4. Model-based corridor performance analysis – An application to a European case

    DEFF Research Database (Denmark)

    Panagakos, George; Psaraftis, Harilaos N.

    2017-01-01

    to a number of Key Performance Indicators (KPIs). It consists of decomposing the corridor into transport chains, selecting a sample of typical chains, assessing these chains through a set of KPIs, and then aggregating the chain-level KPIs to corridor-level ones using proper weights. A critical feature...... refinement and verification. The sample construction part of the methodology was tested on GreCOR, a green corridor project in the North Sea Region, using the Danish National Traffic Model as the principal source of information for both sample construction and KPI estimation. The results show that...

  5. Environmental Assessment for Lignite Fuel Enhancement Project, Coal Creek Station, Great River Energy, Underwood, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-01-16

    The US Department of Energy (DOE) has prepared this EA to assess the environmental impacts of the commercial application of lignite fuel enhancement. The proposed demonstration project would be implemented at Great River Energy's Coal Creek Station near Underwood, North Dakota. The proposed project would demonstrate a technology to increase the heating value of lignite and other high-moisture coals by reducing the moisture in the fuels. Waste heat that would normally be sent to the cooling towers would be used to drive off a percentage of the moisture contained within the lignite. Application of this technology would be expected to boost power-generating efficiencies, provide economic cost savings for lignite and sub-bituminous power plants, and reduce air emissions. The proposed project would be constructed on a previously disturbed site within the Coal Creek Station and no negative impacts would occur in any environmental resource area.

  6. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Loffink, Ken; Duke, Bill

    2008-12-31

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelhead and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one

  7. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  8. First Results from HOTSPOT: The Snake River Plain Scientific Drilling Project, Idaho, U.S.A.

    Directory of Open Access Journals (Sweden)

    John W. Shervais

    2013-03-01

    Full Text Available HOTSPOT is an international collaborative effort to understand the volcanic history of the Snake River Plain (SRP. The SRP overlies a thermal anomaly, the Yellowstone-Snake River hotspot, that is thought to represent a deep-seated mantle plume under North America. Theprimary goal of this project is to document the volcanic and stratigraphic history of the SRP, which represents the surface expression of this hotspot, and to understand how it affected the evolution of continental crust and mantle. An additional goal is to evaluate the geothermal potential of southern Idaho.Project HOTSPOT has completed three drill holes. (1 The Kimama site is located along the central volcanic axis of the SRP; our goal here was to sample a long-term record of basaltic volcanism in the wake of the SRP hotspot. (2 The Kimberly site is located near the margin of the plain; our goal here was to sample a record of high-temperaturerhyolite volcanism associated with the underlying plume. This site was chosen to form a nominally continuous record of volcanism when paired with the Kimama site. (3 The Mountain Home site is located in the western plain; our goal here was to sample the Pliocene-Pleistocene transition in lake sediments at this site and to sample older basalts that underlie the sediments.We report here on our initial results for each site, and on some of the geophysical logging studies carried out as part of this project.

  9. Walla Walla River Basin Fish Habitat Enhancement Project, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2003-04-01

    In 2001, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled six properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River. Since 1997, approximately 7 miles of critical salmonid habitat has been secured for restoration and protection under this project. Major accomplishments to date include the following: Secured approximately $250,000 in cost share; Secured 7 easements; Planted 30,000+ native plants; Installed 50,000+ cuttings; and Seeded 18 acres to native grass. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan. Basin-wide monitoring also included the deployment of 6 thermographs to collect summer stream temperatures.

  10. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2009

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Bryson, Amanda J.; Cameron, April; Coleman, Andre M.; Corbett, C.; Dawley, Earl M.; Ebberts, Blaine D.; Kauffman, Ronald; Roegner, G. Curtis; Russell, Micah T.; Silva, April; Skalski, John R.; Thom, Ronald M.; Vavrinec, John; Woodruff, Dana L.; Zimmerman, Shon A.

    2010-10-26

    This is the sixth annual report of a seven-year project (2004 through 2010) to evaluate the cumulative effects of habitat restoration actions in the lower Columbia River and estuary (LCRE). The project, called the Cumulative Effects Study, is being conducted for the U.S. Army Corps of Engineers Portland District (USACE) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory (PNNL), the Pt. Adams Biological Field Station of the National Marine Fisheries Service (NMFS), the Columbia River Estuary Study Taskforce (CREST), and the University of Washington. The goal of the Cumulative Effects Study is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the 235-km-long LCRE. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. From 2005 through 2009, annual field research involved intensive, comparative studies paired by habitat type (tidal swamp versus marsh), trajectory (restoration versus reference site), and restoration action (tidegate replacement vs. culvert replacement vs. dike breach).

  11. Alligator rivers analogue project. Final report; volume 1; summary of findings

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    The Koongarra uranium ore deposit is located in the Alligator Rivers Region of the Northern Territory of Australia. Many of the processes that have controlled the development of this natural system are relevant to the performance assessment of radioactive waste repositories. An agreement was reached in 1987 by a number of agencies concerned with radioactive waste disposal to set up the International Alligator Rivers Analogue Project (ARAP) to study relevant aspects of the hydrological and geochemical evolution of the site. The Project ran for five years. The aims of the study were: to contribute to the production of reliable and realistic models for radionuclide migration within geological environments relevant to the assessment of the safety of radioactive waste repositories; to develop methods of validation of models using a combination of laboratory and field data associated with the Koongarra uranium deposit; and to encourage maximum interaction between modellers and experimentalists in achieving these objectives. It was anticipated that the substantial databases generated in the field and laboratory studies would then be used to develop and test geochemical and radionuclide transport models. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project is one of a series of 16 volumes

  12. The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project

    International Nuclear Information System (INIS)

    Brock Presgrove, S.

    1992-01-01

    The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste currently stored at the DOE Savannah River Site Tank Farm. Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on the project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review: Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator; The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. (author)

  13. The Ohio River Valley CO2 Storage Project AEP Mountaineer Plan, West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    Neeraj Gupta

    2009-01-07

    This report includes an evaluation of deep rock formations with the objective of providing practical maps, data, and some of the issues considered for carbon dioxide (CO{sub 2}) storage projects in the Ohio River Valley. Injection and storage of CO{sub 2} into deep rock formations represents a feasible option for reducing greenhouse gas emissions from coal-burning power plants concentrated along the Ohio River Valley area. This study is sponsored by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), American Electric Power (AEP), BP, Ohio Coal Development Office, Schlumberger, and Battelle along with its Pacific Northwest Division. An extensive program of drilling, sampling, and testing of a deep well combined with a seismic survey was used to characterize the local and regional geologic features at AEP's 1300-megawatt (MW) Mountaineer Power Plant. Site characterization information has been used as part of a systematic design feasibility assessment for a first-of-a-kind integrated capture and storage facility at an existing coal-fired power plant in the Ohio River Valley region--an area with a large concentration of power plants and other emission sources. Subsurface characterization data have been used for reservoir simulations and to support the review of the issues relating to injection, monitoring, strategy, risk assessment, and regulatory permitting. The high-sulfur coal samples from the region have been tested in a capture test facility to evaluate and optimize basic design for a small-scale capture system and eventually to prepare a detailed design for a capture, local transport, and injection facility. The Ohio River Valley CO{sub 2} Storage Project was conducted in phases with the ultimate objectives of demonstrating both the technical aspects of CO{sub 2} storage and the testing, logistical, regulatory, and outreach issues related to conducting such a project at a large point source under realistic constraints. The site

  14. Science Roles and Interactions in Adaptive Management of Large River Restoration Projects, Midwest United States

    Science.gov (United States)

    Jacobson, R. B.; Galat, D. L.; Smith, C. B.

    2010-12-01

    Most large-river restoration projects include formal or informal implementations of adaptive management strategies which acknowledge uncertainty and use scientific inquiry to learn and refine management options. Although the central role of science in reducing uncertainty is acknowledged in such projects, specific roles and interactions can vary widely, including how science relates to decision-making within the governance of these projects. Our objective is to present some structured generalizations about science roles and interactions as developed from the authors’ experiences in adaptive management of large river restoration in the Midwest United States. Scientific information may be introduced into decision making by scientists acting in any of the three roles common to adaptive management -- action agency representative, stakeholder, or science provider. We have observed that confusion and gridlock can arise when it is unclear if a scientist is acting as an advocate for a stakeholder or management position, or instead as an independent, “honest broker” of science. Although both advocacy and independence are proper and expected in public decision making, it is useful when scientists unambiguously identify their role. While complete scientific independence may be illusory, transparency and peer review can promote the ideal. Transparency comes from setting clear directions and objectives at the decision-making level and defining at the outset how learning will help assess progress and inform decisions. Independent peer reviews of proposals, study plans, and publications serve as a powerful tool to advance scientific independence, even if funding sources present a potential conflict of interest. Selection of experts for scientific advice and review often requires consideration of the balance between benefits of the “outside” expert (independent, knowledgeable but with little specific understanding of the river system), compared to those provided by the

  15. Modeling the Projected Changes of River Flow in Central Vietnam under Different Climate Change Scenarios

    Directory of Open Access Journals (Sweden)

    Tuan B. Le

    2015-07-01

    Full Text Available Recent studies by the United Nations Environment Programme (UNEP and the Intergovernmental Panel on Climate Change (IPCC indicate that Vietnam is one of the countries most affected by climate change. The variability of climate in this region, characterized by large fluctuations in precipitation and temperature, has caused significant changes in surface water resources. This study aims to project the impact of climate change on the seasonal availability of surface water of the Huong River in Central Vietnam in the twenty-first century through hydrologic simulations driven by climate model projections. To calibrate and validate the hydrologic model, the model was forced by the rain gage-based gridded Asian Precipitation–Highly Resolved Observational Data Integration Towards Evaluation of water resources (APHRODITE V1003R1 Monsoon Asia precipitation data along with observed temperature, humidity, wind speed, and solar radiation data from local weather stations. The simulated discharge was compared to observations for the period from 1951 until present. Three Global Climate Models (GCMs ECHAM5-OM, HadCM3 and GFDL-CM2.1 integrated into Long Ashton Research Station-Weather Generator (LARS-WG stochastic weather generator were run for three IPCC–Special Report on Emissions Scenarios (IPCC-SRES emissions scenarios A1B, A2, and B1 to simulate future climate conditions. The hydrologic model simulated the Huong River discharge for each IPCC-SRES scenario. Simulation results under the three GCMs generally indicate an increase in summer and fall river discharge during the twenty-first century in A2 and B1 scenarios. For A1B scenario, HadCM3 and GFDL-CM2.1 models project a decrease in river discharge from present to the 2051–2080 period and then increase until the 2071–2100 period while ECHAM5-OM model produces opposite projection that discharge will increase until the 2051–2080 period and then decrease for the rest of the century. Water management

  16. Research notes : are safety corridors really safe? Evaluation of the corridor safety improvement program.

    Science.gov (United States)

    1998-08-26

    High accident frequencies on Oregons highway corridors are of concern to the Oregon Department of Transportation (ODOT). : ODOT adopted the Corridor Safety Improvement Program as part of an overall program of safety improvements using federal and ...

  17. South Fork Snake River/Palisades Wildlife Mitigation Project: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan to compensate for losses of wildlife and wildlife habitat due to hydroelectric development at Palisades Dam. The Idaho Department of Fish and Game drafted the plan, which was completed in May 1993. This plan recommends land and conservation easement acquisition and wildlife habitat enhancement measures. These measures would be implemented on selected lands along the South Fork of the Snake River between Palisades Dam and the confluence with the Henry`s Fork, and on portions of the Henry`s Fork located in Bonneville, Madison, and Jefferson Counties, Idaho. BPA has prepared an Environmental Assessment evaluating the proposed project. The EA also incorporates by reference the analyses in the South Fork Snake River Activity/Operations Plan and EA prepared jointly in 1991 by the Bureau of Land Management and the Forest Service. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  18. Phase I of the Kissimmee River restoration project, Florida, USA: impacts of construction on water quality.

    Science.gov (United States)

    Colangelo, David J; Jones, Bradley L

    2005-03-01

    Phase I of the Kissimmee River restoration project included backfilling of 12 km of canal and restoring flow through 24 km of continuous river channel. We quantified the effects of construction activities on four water quality parameters (turbidity, total phosphorus flow-weighted concentration, total phosphorus load and dissolved oxygen concentration). Data were collected at stations upstream and downstream of the construction and at four stations within the construction zone to determine if canal backfilling and construction of 2.4 km of new river channel would negatively impact local and downstream water quality. Turbidity levels at the downstream station were elevated for approximately 2 weeks during the one and a half year construction period, but never exceeded the Florida Department of Environmental Protection construction permit criteria. Turbidity levels at stations within the construction zone were high at certain times. Flow-weighted concentration of total phosphorus at the downstream station was slightly higher than the upstream station during construction, but low discharge limited downstream transport of phosphorus. Total phosphorus loads at the upstream and downstream stations were similar and loading to Lake Okeechobee was not significantly affected by construction. Mean water column dissolved oxygen concentrations at all sampling stations were similar during construction.

  19. Concept of ecological corridors and agroforestal systems applied for the implementation of PETROBRAS punctual and linear projects: case study of COMPERJ (Rio de Janeiro Petrochemical Complex); Conceito de corredores ecologicos e sistemas agroflorestais aplicados a implantacao de empreendimentos pontuais e lineares em ambito PETROBRAS: estudo de caso do COMPERJ (Complexo Petroquimico do Rio de Janeiro)

    Energy Technology Data Exchange (ETDEWEB)

    Secron, Marcelo B; Mesquita, Ivan D; Soares, Luiz Felipe R; Almeida, Ronaldo Bento G. de; Fernandes, Renato; Dellamea, Giovani S [PETROBRAS, Rio de Janeiro, RJ (Brazil); Nunes, Rodrigo T; Pereira, Junior, Edson Rodrigues [SEEBLA, Servicos de Engenharia Emilio Baumgart Ltda., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The land use and human occupation realized with an indiscriminate form across many parts of the world, including Brazil, have been causing destruction of great amount of forest mass and green areas. These actions results an isolation of a forest reminder fragment, and in such case, along the time, these fragments become weak and debilitated, characterizing general biodiversity loss or its extinction, in a worse case. This study presents basic concepts of ecological corridors and agroforestal systems, showing the case study that will be implemented in COMPERJ (Rio de Janeiro Petrochemical Complex), pointing the aspects that can be applied for PETROBRAS to offset impacts (biodiversity offsets concept) of punctual and linear projects. (author)

  20. Cesium Ion Exchange Program at the Hanford River Protection Project Waste Treatment Plant

    International Nuclear Information System (INIS)

    CHARLES, NASH

    2004-01-01

    The River Protection Project - Hanford Tank Waste Treatment and Immobilization Plant will use cesium ion exchange to remove 137Cs from Low Activity Waste down to 0.3 Ci/m3 in the Immobilized LAW, ILAW product. The project baseline for cesium ion exchange is the elutable SuperLig, R, 644, SL-644, resin registered trademark of IBC Advanced Technologies, Inc., American Fork, UT or the Department of Energy approved equivalent. SL-644 is solely available through IBC Advanced Technologies. To provide an alternative to this sole-source resin supply, the RPP--WTP initiated a three-stage process for selection and qualification of an alternative ion exchange resin for cesium removal in the RPPWTP. It was recommended that resorcinol formaldehyde RF be pursued as a potential alternative to SL-644

  1. Compliance Monitoring of Underwater Blasting for Rock Removal at Warrior Point, Columbia River Channel Improvement Project, 2009/2010

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.; Woodley, Christa M.; Skalski, J. R.; Seaburg, Adam

    2011-05-10

    The U.S. Army Corps of Engineers, Portland District (USACE) conducted the 20-year Columbia River Channel Improvement Project (CRCIP) to deepen the navigation channel between Portland, Oregon, and the Pacific Ocean to allow transit of fully loaded Panamax ships (100 ft wide, 600 to 700 ft long, and draft 45 to 50 ft). In the vicinity of Warrior Point, between river miles (RM) 87 and 88 near St. Helens, Oregon, the USACE conducted underwater blasting and dredging to remove 300,000 yd3 of a basalt rock formation to reach a depth of 44 ft in the Columbia River navigation channel. The purpose of this report is to document methods and results of the compliance monitoring study for the blasting project at Warrior Point in the Columbia River.

  2. Camdeboo-Mountain Zebra National Park Corridor: Opportunities for conservation and socio-economic development

    Science.gov (United States)

    Matthew Norval

    2015-01-01

    The Wilderness Foundation, in partnership with South African National Parks has initiated a two year project in the Karoo; The Mountain Zebra-Camdeboo Corridor Project. Through either voluntary Contractual National Park or Protected Environment agreements, the project aims to work with, rather than displace, current conservation-compatible land-use practices such as...

  3. Habitat Evaluation Procedures (HEP) Report; Priest River Project, Technical Report 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-05-01

    On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 140.73 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 60.05 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland meadow habitat provides 7.39 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 71.13 HUs for mallard, yellow warbler, and white-tailed deer. Open water habitat provides 2.16 HUs for Canada goose and mallard. The objective of using HEP at the Priest River Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  4. People's perception on impacts of hydro-power projects in Bhagirathi river valley, India.

    Science.gov (United States)

    Negi, G C S; Punetha, Disha

    2017-04-01

    The people's perception on environmental and socio-economic impacts due to three hydro-electric projects (HEPs; commissioned and under construction) were studied in the north-west Indian Himalaya. Surveys among 140 project-affected people (PAPs) using a checklist of impacts indicate that among the negative impacts, decrease in flora/fauna, agriculture, flow of river, aesthetic beauty; and increase in water pollution, river bed quarrying for sand/stone, human settlement on river banks and social evils; and among the positive impacts, increase in standard of living, road connectivity, means of transport, public amenities, tourism and environmental awareness were related with HEPs. The PAPs tend to forget the negative impacts with the age of the HEPs after it becomes functional, and the positive impacts seem to outweigh the negative impacts. Study concludes that it is difficult to separate the compounding impacts due to HEP construction and other anthropogenic and natural factors, and in the absence of cause-and-effect analyses, it is hard to dispel the prevailing notion that HEPs are undesirable in the study area that led to agitations by the environmentalists and stopped construction of one of these HEPs. To overcome the situation, multi-disciplinary scientific studies involving the PAPs need to be carried out in planning and decision-making to make HEPs environment friendly and sustainable in this region. There is also a need to adopt low carbon electric power technologies and promote a decentralized energy strategy through joint ventures between public and private companies utilizing locally available renewable energy resources.

  5. Ecological effects and potential risks of the water diversion project in the Heihe River Basin.

    Science.gov (United States)

    Zhang, Mengmeng; Wang, Shuai; Fu, Bojie; Gao, Guangyao; Shen, Qin

    2018-04-01

    To curb the severe ecological deterioration in the lower Heihe River Basin (HRB) in northwest China, a water diversion project was initiated in 2000. A comprehensive analysis of the ecological effects and potential risks associated with the project is needed. We assessed the hydrological and ecological achievements, and also analyzed the potential problems after the project was completed. We found that since the project began the hydrological regime has changed, with more than 57.82% of the upstream water being discharged to the lower reaches on average. As a result, the groundwater level in the lower reaches has risen; the terminal lake has gradually expanded to a maximum area in excess of 50km 2 since 2010, and there has been a significant recovery of vegetation in the riparian zone and the Ejin core oases, which represents the initial rehabilitation of the degraded downstream environment. Additionally, the economy of Ejin has developed spectacularly, with an annual growth rate of 28.06%. However, in the middle reaches, the average groundwater level has continuously declined by a total of 5.8m and significant degradation of the vegetation has occurred along the river course. The discrepancy in the water allocation between the middle and lower reaches has intensified. This highlights the inability of the current water diversion scheme to realize further ecological restoration and achieve sustainable development throughout the whole basin. In future water management programs, we recommend that water allocation is coordinated by considering the basin as an integrated entity and to scientifically determine the size of the midstream farmland and downstream oasis; restrict non-ecological water use in the lower reaches, and jointly dispatch the surface water and groundwater. Copyright © 2017 Elsevier B.V. All rights reserved.

  6. Multi-Model Projections of River Flood Risk in Europe under Global Warming

    Directory of Open Access Journals (Sweden)

    Lorenzo Alfieri

    2018-01-01

    Full Text Available Knowledge on the costs of natural disasters under climate change is key information for planning adaptation and mitigation strategies of future climate policies. Impact models for large scale flood risk assessment have made leaps forward in the past few years, thanks to the increased availability of high resolution climate projections and of information on local exposure and vulnerability to river floods. Yet, state-of-the-art flood impact models rely on a number of input data and techniques that can substantially influence their results. This work compares estimates of river flood risk in Europe from three recent case studies, assuming global warming scenarios of 1.5, 2, and 3 degrees Celsius from pre-industrial levels. The assessment is based on comparing ensemble projections of expected damage and population affected at country level. Differences and common points between the three cases are shown, to point out main sources of uncertainty, strengths, and limitations. In addition, the multi-model comparison helps identify regions with the largest agreement on specific changes in flood risk. Results show that global warming is linked to substantial increase in flood risk over most countries in Central and Western Europe at all warming levels. In Eastern Europe, the average change in flood risk is smaller and the multi-model agreement is poorer.

  7. Planning, development and experiences obtained with the execution of the Project Surata River

    International Nuclear Information System (INIS)

    Carreno, Erwin Wolff

    2004-01-01

    From May 1997 is executed the Project, Reduction of the Contamination to the small mining in the basin of the Surata River (known and abbreviated as project Surata River), which has been developed inside the mark of the technical cooperation between the governments from Colombia and Germany. The German support will culminate September 30 the 2004. After many trips for reasons of public order and for those originated in the administrative processes, it could diagnose himself the mining of Vetas and California region, it stops later on to execute works in the different facilities of benefit of minerals in dispersed form and finally to find the most significant route as contribution of the contamination reduction: to develop integral measures in each one of the units that benefit the mineral in the area. The efforts so much institutional as personnel they have been very big and the strong investments; it memorized of the lessons, and it is aspired to continue with the programming of the activities beyond October - 2004, with the support of the involved Colombian institutions. Now they know each other and they have been applied in the region, technologies environmentally clean in prosecution of gold minerals, those that in opposition of that thought of a principle, they also rebound in increment of the economic revenues of the miners

  8. Evaluation of Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Thom, Ronald M.; Roegner, G. Curtis; Ebberts, Blaine D.; Skalski, John R.; Borde, Amy B.; Dawley, Earl; Coleman, Andre M.; Woodruff, Dana L.; Breithaupt, Stephen A.; Cameron, April; Corbett, C.; Donley, Erin E.; Jay, D. A.; Ke, Yinghai; Leffler, K.; McNeil, C.; Studebaker, Cindy; Tagestad, Jerry D.

    2012-05-01

    This is the seventh and final annual report of a project (2004–2010) addressing evaluation of the cumulative effects of habitat restoration actions in the 235-km-long lower Columbia River and estuary. The project, called the Cumulative Effects (CE) study, was conducted for the U.S. Army Corps of Engineers Portland District by a collaboration of research agencies led by the Pacific Northwest National Laboratory. We achieved the primary goal of the CE study to develop a methodology to evaluate the cumulative effects of habitat actions in the Columbia Estuary Ecosystem Restoration Program. We delivered 1) standard monitoring protocols and methods to prioritize monitoring activities; 2) the theoretical and empirical basis for a CE methodology using levels-of-evidence; 3) evaluations of cumulative effects using ecological relationships, geo-referenced data, hydrodynamic modeling, and meta-analyses; and 4) an adaptive management process to coordinate and coalesce restoration efforts in the LCRE. A solid foundation has been laid for future comprehensive evaluations of progress made by the Columbia Estuary Ecosystem Restoration Program to understand, conserve, and restore ecosystems in the lower Columbia River and estuary.

  9. Streamflow timing of mountain rivers in Spain: Recent changes and future projections

    Science.gov (United States)

    Morán-Tejeda, Enrique; Lorenzo-Lacruz, Jorge; López-Moreno, Juan Ignacio; Rahman, Kazi; Beniston, Martin

    2014-09-01

    Changes in streamflow timing are studied in 27 mountain rivers in Spain, in the context of climate warming. The studied rivers are characterized by a highflows period in spring due to snowmelt, although differences in the role of snow and consequently in the timing of flows are observed amongst cases. We calculated for every year of the studied period (1976-2008) various hydrological indices that enable locating the timing of spring flows within the annual hydrologic regime, including the day of 75% of mass, and the day of spring maximum. The evolution of these indices was compared with that of seasonal precipitation and temperature, and trends in time were calculated. Results show a general negative trend in the studied indices which indicates that spring peaks due to snowmelt are shifting earlier within the hydrological year. Spring temperatures, which show a significant increasing trend, are the main co-variable responsible for the observed changes in the streamflow timing. In a second set of analyses we performed hydrological simulations with the SWAT model, in order to estimate changes in streamflow timing under projected warming temperatures. Projections show further shifting of spring peak flows along with a more pronounced low water level period in the summer. The simulations also allowed quantifying the role of snowfall-snowmelt on the observed changes in streamflow.

  10. Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

  11. 76 FR 34139 - Northeast Corridor Safety Committee; Meeting Postponement

    Science.gov (United States)

    2011-06-10

    .... 2] Northeast Corridor Safety Committee; Meeting Postponement AGENCY: Federal Railroad Administration... announced the first meeting of the Northeast Corridor Safety Committee, a Federal Advisory Committee... future date. DATES: The meeting of the Northeast Corridor Safety Committee scheduled to commence on...

  12. 77 FR 3326 - Northeast Corridor Safety Committee; Notice of Meeting

    Science.gov (United States)

    2012-01-23

    .... 3] Northeast Corridor Safety Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Northeast Corridor Safety Committee Meeting. SUMMARY: FRA announced the first meeting of the Northeast Corridor Safety Committee, a Federal...

  13. 76 FR 32391 - Northeast Corridor Safety Committee; Notice of Meeting

    Science.gov (United States)

    2011-06-06

    .... 1] Northeast Corridor Safety Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of the Northeast Corridor Safety Committee Meeting. SUMMARY: FRA announces the first meeting of the Northeast Corridor Safety Committee, a...

  14. Early environmental planning: A process for power line corridor selection

    International Nuclear Information System (INIS)

    Haagenstad, T.; Bare, C.M.

    1998-01-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory's electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures

  15. Mid-21st century projections of hydroclimate in Western Himalayas and Satluj River basin

    Science.gov (United States)

    Tiwari, Sarita; Kar, Sarat C.; Bhatla, R.

    2018-02-01

    The Himalayan climate system is sensitive to global warming and climate change. Regional hydrology and the downstream water flow in the rivers of Himalayan origin may change due to variations in snow and glacier melt in the region. This study examines the mid-21st century climate projections over western Himalayas from the Coupled Model Intercomparison Project Phase 5 (CMIP5) global climate models under Representative Concentration Pathways (RCP) scenarios (RCP4.5 and RCP8.5). All the global climate models used in the present analysis indicate that the study region would be warmer by mid-century. The temperature trends from all the models studied here are statistically significant at 95% confidence interval. Multi-model ensemble spreads show that there are large differences among the models in their projections of future climate with spread in temperature ranging from about 1.5 °C to 5 °C over various areas of western Himalayas in all the seasons. Spread in precipitation projections lies between 0.3 and 1 mm/day in all the seasons. Major shift in the timing of evaporation maxima and minima is noticed. The GFDL_ESM2G model products have been downscaled to Satluj River basin using the weather research and forecast (WRF) model and impact of climate change on streamflow has been studied. The reduction of precipitation during JJAS is expected to be > 3-6 mm/day in RCP8.5 as compared to present climate. It is expected that precipitation amount shall increase over Satluj basin in future (mid-21st century) The soil and water assessment tool (SWAT) model has been used to simulate the Satluj streamflow for the present and future climate using GFDL_ESM2G precipitation and temperature data as well as the WRF model downscaled data. The computations using the global model data show that total annual discharge from Satluj will be less in future than that in present climate, especially in peak discharge season (JJAS). The SWAT model with downscaled output indicates that during

  16. Joint optimization scheduling for water conservancy projects in complex river networks

    Directory of Open Access Journals (Sweden)

    Qin Liu

    2017-01-01

    Full Text Available In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.

  17. Flathead River Instream Flow Investigation Project : Final Report 1996-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Miller, William J. (Miller Ecological Consultants., Fort Collins, CO); Ptacek, Jonathan A. (Miller Ecological Consultants, Inc., Fort Collins, CO)

    2003-09-01

    A modified Instream Flow Incremental Methodology (IFIM) approach was used on the mainstem Flathead River from the South Fork Flathead River downstream to Flathead Lake. The objective of this study was to quantify changes in habitat for the target fish species, bull trout (Salvelinus confluentus) and west slope cutthroat trout (Oncorhynchus clarki lewisi), as a function of discharge in the river. This approach used a combination of georeferenced field data for each study site combined with a two-dimensional hydraulic simulation of river hydraulic characteristics. The hydraulic simulations were combined with habitat suitability criteria in a GIS analysis format to determine habitat area as a function of discharge. Results of the analysis showed that habitat area is more available at lower discharges than higher discharges and that in comparison of the pre-dam hydrology with post-dam hydrology, the stable pre-dam baseflows provided more stable habitat than the highly variable flow regime during both summer and winter baseflow post-dam periods. The variability week to week and day to day under post-dam conditions waters and dewaters stream margins. This forces sub-adult fish, in particular bull trout, to use less productive habitat during the night. There is a distinct difference between daytime and nighttime habitat use for bull trout sub-adults. The marginal areas that are constantly wet and then dried provide little in productivity for lower trophic levels and consequently become unproductive for higher trophic levels, especially bull trout sub-adults that use those areas as flows increase. A stable flow regime would be more productive than flow regimes with high variability week to week. The highly variable flows likely put stress on a bull trout subadult and west slope cutthroat trout, due to the additional movement required to find suitable habitat. The GIS approach presented here provides both a visual characterization of habitat as well as Arcview project data

  18. Simulated hydrologic response to projected changes in precipitation and temperature in the Congo River basin

    Directory of Open Access Journals (Sweden)

    N. Aloysius

    2017-08-01

    Full Text Available Despite their global significance, the impacts of climate change on water resources and associated ecosystem services in the Congo River basin (CRB have been understudied. Of particular need for decision makers is the availability of spatial and temporal variability of runoff projections. Here, with the aid of a spatially explicit hydrological model forced with precipitation and temperature projections from 25 global climate models (GCMs under two greenhouse gas emission scenarios, we explore the variability in modeled runoff in the near future (2016–2035 and mid-century (2046–2065. We find that total runoff from the CRB is projected to increase by 5 % [−9 %; 20 %] (mean – min and max – across model ensembles over the next two decades and by 7 % [−12 %; 24 %] by mid-century. Projected changes in runoff from subwatersheds distributed within the CRB vary in magnitude and sign. Over the equatorial region and in parts of northern and southwestern CRB, most models project an overall increase in precipitation and, subsequently, runoff. A simulated decrease in precipitation leads to a decline in runoff from headwater regions located in the northeastern and southeastern CRB. Climate model selection plays an important role in future projections for both magnitude and direction of change. The multimodel ensemble approach reveals that precipitation and runoff changes under business-as-usual and avoided greenhouse gas emission scenarios (RCP8.5 vs. RCP4.5 are relatively similar in the near term but deviate in the midterm, which underscores the need for rapid action on climate change adaptation. Our assessment demonstrates the need to include uncertainties in climate model and emission scenario selection during decision-making processes related to climate change mitigation and adaptation.

  19. Simulated hydrologic response to projected changes in precipitation and temperature in the Congo River basin

    Science.gov (United States)

    Aloysius, Noel; Saiers, James

    2017-08-01

    Despite their global significance, the impacts of climate change on water resources and associated ecosystem services in the Congo River basin (CRB) have been understudied. Of particular need for decision makers is the availability of spatial and temporal variability of runoff projections. Here, with the aid of a spatially explicit hydrological model forced with precipitation and temperature projections from 25 global climate models (GCMs) under two greenhouse gas emission scenarios, we explore the variability in modeled runoff in the near future (2016-2035) and mid-century (2046-2065). We find that total runoff from the CRB is projected to increase by 5 % [-9 %; 20 %] (mean - min and max - across model ensembles) over the next two decades and by 7 % [-12 %; 24 %] by mid-century. Projected changes in runoff from subwatersheds distributed within the CRB vary in magnitude and sign. Over the equatorial region and in parts of northern and southwestern CRB, most models project an overall increase in precipitation and, subsequently, runoff. A simulated decrease in precipitation leads to a decline in runoff from headwater regions located in the northeastern and southeastern CRB. Climate model selection plays an important role in future projections for both magnitude and direction of change. The multimodel ensemble approach reveals that precipitation and runoff changes under business-as-usual and avoided greenhouse gas emission scenarios (RCP8.5 vs. RCP4.5) are relatively similar in the near term but deviate in the midterm, which underscores the need for rapid action on climate change adaptation. Our assessment demonstrates the need to include uncertainties in climate model and emission scenario selection during decision-making processes related to climate change mitigation and adaptation.

  20. Projections of Flood Risk using Credible Climate Signals in the Ohio River Basin

    Science.gov (United States)

    Schlef, K.; Robertson, A. W.; Brown, C.

    2017-12-01

    Estimating future hydrologic flood risk under non-stationary climate is a key challenge to the design of long-term water resources infrastructure and flood management strategies. In this work, we demonstrate how projections of large-scale climate patterns can be credibly used to create projections of long-term flood risk. Our study area is the northwest region of the Ohio River Basin in the United States Midwest. In the region, three major teleconnections have been previously demonstrated to affect synoptic patterns that influence extreme precipitation and streamflow: the El Nino Southern Oscillation, the Pacific North American pattern, and the Pacific Decadal Oscillation. These teleconnections are strongest during the winter season (January-March), which also experiences the greatest number of peak flow events. For this reason, flood events are defined as the maximum daily streamflow to occur in the winter season. For each gage in the region, the location parameter of a log Pearson type 3 distribution is conditioned on the first principal component of the three teleconnections to create a statistical model of flood events. Future projections of flood risk are created by forcing the statistical model with projections of the teleconnections from general circulation models selected for skill. We compare the results of our method to the results of two other methods: the traditional model chain (i.e., general circulation model projections to downscaling method to hydrologic model to flood frequency analysis) and that of using the historic trend. We also discuss the potential for developing credible projections of flood events for the continental United States.

  1. Ecological response of a multi-purpose river development project using macro-invertebrates richness and fish habitat value

    International Nuclear Information System (INIS)

    Pellaud, M.

    2007-05-01

    It has been acknowledged that river morphology and hydrology have been intensively altered due to the anthropic demands in floodplain land use and management, flood protection, promotion of navigability or energy production. Rivers were transformed in water highways, having lost contact with their surrounding floodplain as well as the plethora of ecological processes and occupants once thriving in these ecotonal zones. The identification of this emerging threat of morphological and hydrological alteration on ecological integrity adds further complexity in the exploitation of hydrosystem resources. These resources are heavily coveted and guarded by different lobbies each having strategic views on future project development. Stakeholders may want to promote hydro-electricity, ecologists a natural reserve, communes may wish to have an increased flood protection and leisure promoters a nautical center. As a result, the proposition of a river development project is certain to face opposition of one party or the other. The motivations of this dissertation are anchored in this context, where various and sometimes conflicting potentials for hydrosystem exploitation remain. This works aims at contributing scientifically to an innovative approach at the conception phase of a multi-purpose river development project by developing the ecological module to be implemented in the general project's optimizer. The SYNERGIE project hypothesis is that it should be possible to identify a synergetic pattern joining the interests of ecological integrity, flood safety, energy production and leisure development. Such a multi-objective river development project would stand more chance of acceptance. This dissertation focuses on the ecological aspects of such a river development project and an application on the regulated Swiss Upper Rhone River. Is expected an ecological answer to a river development project design / management which has to be compatible with Heller's Heller (2007) general

  2. Public perception of an ecological rehabilitation project in inland river basins in northern China: Success or failure.

    Science.gov (United States)

    Feng, Qi; Miao, Zheng; Li, Zongxing; Li, Jianguo; Si, Jianhua; S, Yonghong; Chang, Zongqiang

    2015-05-01

    The need for environmental protection challenges societies to deal with difficult problems because strategies designed by scientists to protect the environment often create negative effects on impoverished local residents. We investigated the effects of China's national and regional policies related to environmental protection and rehabilitation projects in inland river basins, by studying the effect of projects in the Heihe and Shiyang river basins, in northwest China. Interviews and surveys were conducted at 30 sites in the lower reaches of these two arid basins, an area that has experienced severe ecological degradation. The survey results show the ecological rehabilitation projects adversely affected the livelihoods of 70.35% of foresters, 64.89% of farmers and 62.24% of herders in the Minqing region in the lower Shiyang River Basin; also, the projects negatively affected 51.9% of residents in the Ejin Qi in the lower Heihe River Basin. This caused 16.33% of foresters, 39.90% of farmers and 45.32% of herders in the Minqing region to not support the project and 37.5% of residents in the Ejin Qi region said they will deforest and graze again after the project ends. The negative impacts of the policies connected to the projects cause these attitudes. The projects prohibit felling and grazing and require residents to give up groundwater mining; this results in a great amount of uncompensated economic loss to them. Extensive survey data document the concerns of local residents, concerns that are supported by the calculation of actual incomes. In addition, the surveys results show poorer interviewees believe the projects greatly affected their livelihoods. While citizens in this region support environment protection work, the poor require considerable assistance if one expects them to support this type of work. Governmental assistance can greatly improve their living conditions, and hence encourage them to participate in and support the implementation of the projects

  3. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    The restoration of wetland salmon habitat in the tidal portion of the Columbia River is occurring at an accelerating pace and is anticipated to improve habitat quality and effect hydrological reconnection between existing and restored habitats. Currently multiple groups are applying a variety of restoration strategies in an attempt to emulate historic estuarine processes. However, the region lacks both a standardized means of evaluating the effectiveness of individual projects as well as methods for determining the cumulative effects of all restoration projects on a regional scale. This project is working to establish a framework to evaluate individual and cumulative ecosystem responses to restoration activities in order to validate the effectiveness of habitat restoration activities designed to benefit salmon through improvements to habitat quality and habitat opportunity (i.e. access) in the Columbia River from Bonneville Dam to the ocean. The review and synthesis of approaches to measure the cumulative effects of multiple restoration projects focused on defining methods and metrics of relevance to the CRE, and, in particular, juvenile salmon use of this system. An extensive literature review found no previous study assessing the cumulative effects of multiple restoration projects on the fundamental processes and functions of a large estuarine system, although studies are underway in other large land-margin ecosystems including the Florida Everglades and the Louisiana coastal wetlands. Literature from a variety of scientific disciplines was consulted to identify the ways that effects can accumulate (e.g., delayed effects, cross-boundary effects, compounding effects, indirect effects, triggers and thresholds) as well as standard and innovative tools and methods utilized in cumulative effects analyses: conceptual models, matrices, checklists, modeling, trends analysis, geographic information systems, carrying capacity analysis, and ecosystem analysis. Potential

  4. Determining Columbia and Snake River Project Tailrace and Forebay Zones of Hydraulic Influence using MASS2 Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01

    Although fisheries biology studies are frequently performed at US Army Corps of Engineers (USACE) projects along the Columbia and Snake Rivers, there is currently no consistent definition of the ``forebay'' and ``tailrace'' regions for these studies. At this time, each study may use somewhat arbitrary lines (e.g., the Boat Restriction Zone) to define the upstream and downstream limits of the study, which may be significantly different at each project. Fisheries researchers are interested in establishing a consistent definition of project forebay and tailrace regions for the hydroelectric projects on the lower Columbia and Snake rivers. The Hydraulic Extent of a project was defined by USACE (Brad Eppard, USACE-CENWP) as follows: The river reach directly upstream (forebay) and downstream (tailrace) of a project that is influenced by the normal range of dam operations. Outside this reach, for a particular river discharge, changes in dam operations cannot be detected by hydraulic measurement. The purpose of this study was to, in consultation with USACE and regional representatives, develop and apply a consistent set of criteria for determining the hydraulic extent of each of the projects in the lower Columbia and Snake rivers. A 2D depth-averaged river model, MASS2, was applied to the Snake and Columbia Rivers. New computational meshes were developed most reaches and the underlying bathymetric data updated to the most current survey data. The computational meshes resolved each spillway bay and turbine unit at each project and extended from project to project. MASS2 was run for a range of total river flows and each flow for a range of project operations at each project. The modeled flow was analyzed to determine the range of velocity magnitude differences and the range of flow direction differences at each location in the computational mesh for each total river flow. Maps of the differences in flow direction and velocity magnitude were created. USACE

  5. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers.

    Science.gov (United States)

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m(3)/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  6. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers

    Science.gov (United States)

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m3/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  7. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    1999-01-01

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment

  8. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021)

  9. Fort Cobb Reservoir Watershed, Oklahoma and Thika River Watershed, Kenya Twinning Pilot Project

    Science.gov (United States)

    Moriasi, D.; Steiner, J.; Arnold, J.; Allen, P.; Dunbar, J.; Shisanya, C.; Gathenya, J.; Nyaoro, J.; Sang, J.

    2007-12-01

    The Fort Cobb Reservoir Watershed (FCRW) (830 km2) is a watershed within the HELP Washita Basin, located in Caddo and Washita Counties, OK. It is also a benchmark watershed under USDA's Conservation Effects Assessment Project, a national project to quantify environmental effects of USDA and other conservation programs. Population in south-western Oklahoma, in which FCRW is located, is sparse and decreasing. Agricultural focuses on commodity production (beef, wheat, and row crops) with high costs and low margins. Surface and groundwater resources supply public, domestic, and irrigation water. Fort Cobb Reservoir and contributing stream segments are listed on the Oklahoma 303(d) list as not meeting water quality standards based on sedimentation, trophic level of the lake associated with phosphorus loads, and nitrogen in some stream segments in some seasons. Preliminary results from a rapid geomorphic assessment results indicated that unstable stream channels dominate the stream networks and make a significant but unknown contribution to suspended-sediment loadings. Impairment of the lake for municipal water supply, recreation, and fish and wildlife are important factors in local economies. The Thika River Watershed (TRW) (867 km2) is located in central Kenya. Population in TRW is high and increasing, which has led to a poor land-population ratio with population densities ranging from 250 people/km2 to over 500 people/km2. The poor land-population ratio has resulted in land sub-division, fragmentation, over- cultivation, overgrazing, and deforestation which have serious implications on soil erosion, which poses a threat to both agricultural production and downstream reservoirs. Agricultural focuses mainly on subsistence and some cash crops (dairy cattle, corn, beans, coffee, floriculture and pineapple) farming. Surface and groundwater resources supply domestic, public, and hydroelectric power generation water. Thika River supplies 80% of the water for the city of

  10. Environmental considerations of coal gasification technology and the Wabash River Repowering Project

    International Nuclear Information System (INIS)

    Lessig, W.S.; Frederick, J.D.

    1993-01-01

    The Clean Air Act Amendments of 1990 have mandated a significant reduction in sulfur dioxide emissions. Coal gasification can assist coal burning utilities in meeting this challenge. The use of combustion turbines in the cycle is an important factor in terms of efficiency and pollution control technologies. The gasification process can be utilized in several applications including 'repowering' existing coal-fired facilities as well as new 'greenfield' projects. This paper addresses the environmental benefits of the repowering application at PSI Energy's Wabash River Station. The environmental impacts of air, water, solid waste, trace hazardous air pollutants, and fuel sources are addressed. Specifically, sulfur removal is discussed on both a technical and an economic level

  11. Application of a Sediment Information System to the Three Gorges Project on Yangtze River, China

    Science.gov (United States)

    Cao, Shuyou; Liu, Xingnian; Yang, Kejun; Li, Changzhi

    Based on survey and analysis of a huge number of observed entrance sediment transport data and the research results of physical and numerical modeling of Three Gorges Reservoir on the Yangtze River, a sediment information system was designed. The basis of this system includes spatial data and properties of geographic elements, and various documents involved to the Three Gorges Project (TGP). Database and knowledge base are constructed as the information bank. The running environment is constructed by the general control program to realize requirements about various sediment information. The system chooses the window software as the system software. The techniques of graphical user interfaces and groupware geographic information system are applied in this system. In this phase, the emphases of the system are development of document system, map system, and presentation system. Cross-section system of the TGP was also attached. For further improvement of the system, a prepared interface of decision supporting subsystem is finished.

  12. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

    2008-10-01

    The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

  13. Water Quality Projects Summary for the Mid-Columbia and Cumberland River Systems

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hadjerioua, Boualem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-04-01

    Scheduling and operational control of hydropower systems is accompanied with a keen awareness of the management of water use, environmental effects, and policy, especially within the context of strict water rights policy and generation maximization. This is a multi-objective problem for many hydropower systems, including the Cumberland and Mid-Columbia river systems. Though each of these two systems have distinct operational philosophies, hydrologic characteristics, and system dynamics, they both share a responsibility to effectively manage hydropower and the environment, which requires state-of-the art improvements in the approaches and applications for water quality modeling. The Department of Energy and Oak Ridge National Laboratory have developed tools for total dissolved gas (TDG) prediction on the Mid-Columbia River and a decision-support system used for hydropower generation and environmental optimization on the Cumberland River. In conjunction with IIHR - Hydroscience & Engineering, The University of Iowa and University of Colorado s Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), ORNL has managed the development of a TDG predictive methodology at seven dams along the Mid-Columbia River and has enabled the ability to utilize this methodology for optimization of operations at these projects with the commercially available software package Riverware. ORNL has also managed the collaboration with Vanderbilt University and Lipscomb University to develop a state-of-the art method for reducing high-fidelity water quality modeling results into surrogate models which can be used effectively within the context of optimization efforts to maximize generation for a reservoir system based on environmental and policy constraints. The novel contribution of these efforts is the ability to predict water quality conditions with simplified methodologies at the same level of accuracy as more complex and resource intensive computing methods

  14. Hazardous materials in Aquatic environments of the Mississippi River basin. Quarterly project status report, 1 January 1994--30 March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Abdelghani, A.

    1994-06-01

    Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.

  15. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, October 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly project status report discusses research projects being conducted on hazardous materials in aquatic environments of the Mississippi River basin. We continued to seek improvement in our methods of communication and interactions to support the inter-disciplinary, inter-university collaborators within this program. In addition to the defined collaborative research teams, there is increasing interaction among investigators across projects. Planning for the second year of the project has included the development of our internal request for proposals, and refining the review process for selection of proposals for funding.

  16. Protect Anadromous Salmonids in the Mainstem Corridor, Monitoring and Evaluation, Annual Report 200-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Vigg, Steven; Johnson, John

    2002-02-01

    In this annual Monitoring & Evaluation (M&E) report to the Bonneville Power Administration (BPA), we summarize significant activities and performance measures resultant from enhanced protection by Columbia River Inter-Tribal Fisheries Enforcement (CRITFE) in the mainstem corridor (BPA Project 2000-056). This report covers the Fiscal Year (FY) 2000 performance period -- May 15, 2000 to May 14, 2001. Quarterly progress reports have previously been submitted to BPA and are posted on the M&E Web site (www.Eco-Law.net) -- for the time period April-December 2000 (Vigg 2000b,c,d) and for the period January-June 2001 (Vigg 2001a,b). We also present comprehensive data representing the first quarter of year 2000 in this report for a pre-project comparison. In addition, we have analyzed specific annual enforcement statistics to evaluate trends during the baseline period 1996-2000. Additional statistics and more years of comprehensive baseline data are now being summarized, and will be presented in future M&E annual reports--to provide a longer time series for evaluation of trends in input, output and outcome performance standards.

  17. Mapping mountain torrent hazards in the Hexi Corridor using an evidential reasoning approach

    Science.gov (United States)

    Ran, Youhua; Liu, Jinpeng; Tian, Feng; Wang, Dekai

    2017-02-01

    The Hexi Corridor is an important part of the Silk Road Economic Belt and a crucial channel for westward development in China. Many important national engineering projects pass through the corridor, such as highways, railways, and the West-to-East Gas Pipeline. The frequent torrent disasters greatly impact the security of infrastructure and human safety. In this study, an evidential reasoning approach based on Dempster-Shafer theory is proposed for mapping mountain torrent hazards in the Hexi Corridor. A torrent hazard map for the Hexi Corridor was generated by integrating the driving factors of mountain torrent disasters including precipitation, terrain, flow concentration processes, and the vegetation fraction. The results show that the capability of the proposed method is satisfactory. The torrent hazard map shows that there is high potential torrent hazard in the central and southeastern Hexi Corridor. The results are useful for engineering planning support and resource protection in the Hexi Corridor. Further efforts are discussed for improving torrent hazard mapping and prediction.

  18. Siliguri: A Geopolitical Manoeuvre Corridor in the Eastern Himalayan Region for China and India

    Directory of Open Access Journals (Sweden)

    Hasan Yaser Malik

    2015-12-01

    Full Text Available Siliguri Corridor being part of Indian West Bengal is a diplomatic manoeuvre place located between Nepal, Bhutan, Bangladesh, India’s Seven Sister States and Chumbi Hills in the Eastern Himalayan Region. Being located at the crossroads and centrally situated between all the neighbouring countries the landlocked Siliguri has an especially economic and political value for the regional countries. The corridor being in close proximity to China and India’s Seven Sister States has added to the diplomatic mosaic of the Eastern Himalayan Region. The region consists of beautiful landscape, mountains and rivers which not only add to topographical diversity but also demographic mixture. Despite its geopolitical significance the area could not advance for not only being a northeastern border region but also for being a gateway to the Seven Sister States. Peripheral development of Siliguri Corridor is one of the reasons for illegal practices like smuggling and terrorism. In year 2002 Nepal, Bhutan and Bangladesh discussed a proposal to form a free trade corridor to simplify the goods transportation through Siliguri Corridor but no such pact could be concluded that would have avoided the activities like smuggling and terrorism mainly through economic and diplomatic ventures.

  19. Data management for the Clinch River Breeder Reactor Plant Project by use of document status and hold systems

    International Nuclear Information System (INIS)

    Hunt, C.S.; Beck, A.E.; Akhtar, M.S.

    1982-01-01

    This paper describes the development, framework, and scope of the Document Status System and the Document Hold System for the Clinch River Breeder Reactor Plant Project. It shows how data are generated at five locations and transmitted to a central computer for processing and storage. The resulting computerized data bank provides reports needed to perform day-to-day management and engineering planning. Those reports also partially satisfy the requirements of the Project's Quality Assurance Program

  20. Data of groundwater from boreholes, river water and precipitation for the Horonobe Underground Research Laboratory project. 2011-2010

    Energy Technology Data Exchange (ETDEWEB)

    Amano, Yuki; Yamamoto, Yoichi; Nanjyo, Isao; Murakami, Hiroaki; Yokota, Hideharu; Yamazaki, Masanori; Iwatsuki, Teruki [Japan Atomic Energy Agency, Geological Isolation Research and Development Directorate, Horonobe, Hokkaido (Japan); Kunimaru, Takanori [Japan Atomic Energy Agency, Geological Isolation Research and Development Directorate, Mizunami, Gifu (Japan); Oyama, Takahiro [Central Research Inst. of Electric Power Industry, Tokyo (Japan)

    2012-02-15

    In the Horonobe Underground Research Laboratory (URL) Project, groundwater from boreholes, river water and precipitation have been analyzed for the environmental monitoring since the fiscal year 2001. This report shows the data set of water chemistry since the fiscal year 2001 to the fiscal year 2010. (author)

  1. Hanford Waste Simulants Created to Support the Research and Development on the River Protection Project - Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Eibling, R.E.

    2001-07-26

    The development of nonradioactive waste simulants to support the River Protection Project - Waste Treatment Plant bench and pilot-scale testing is crucial to the design of the facility. The report documents the simulants development to support the SRTC programs and the strategies used to produce the simulants.

  2. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, 1 April--30 June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report contains a cluster of twenty separate project reports concerning the fate, environmental transport, and toxicity of hazardous wastes in the Mississippi River Basin. Some of topics investigated involve: biological uptake and metabolism; heavy metal immobilization; biological indicators; toxicity; and mathematical models.

  3. Data of groundwater from boreholes, river water and precipitation for the Horonobe Underground Research Laboratory project. 2011-2010

    International Nuclear Information System (INIS)

    Amano, Yuki; Yamamoto, Yoichi; Nanjyo, Isao; Murakami, Hiroaki; Yokota, Hideharu; Yamazaki, Masanori; Iwatsuki, Teruki; Kunimaru, Takanori; Oyama, Takahiro

    2012-02-01

    In the Horonobe Underground Research Laboratory (URL) Project, groundwater from boreholes, river water and precipitation have been analyzed for the environmental monitoring since the fiscal year 2001. This report shows the data set of water chemistry since the fiscal year 2001 to the fiscal year 2010. (author)

  4. Corridor Length and Patch Colonization by a Butterfly Junonia coenia

    Energy Technology Data Exchange (ETDEWEB)

    Nick Haddad

    2000-06-01

    Habitat corridors have been proposed to reduce patch isolation and increase population persistence in fragmented landscapes. This study tested whether patch colonization was increased by the presence and various length corridors. The specific butterfly species tested has been shown to use corridors, however, the results indicate that neither the distance between patches or the presence of a corridor influenced colonization.

  5. Evaluation of Bull Trout Movements in the Tucannon and Lower Snake Rivers, 2002-2006 Project Completion Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Faler, Michael P. [U.S. Fish and Wildlife Service; Mendel, Glen; Fulton, Carl [Washington Department of Fish and Wildlife

    2008-11-20

    was small (n=6). In spite of this project's shortcomings, bull trout continue to be observed in low numbers at Snake River dam fish facilities. It is highly possible that bull trout observed at the Snake River dam fish facilities are originating from sources other than the Tucannon River. We suggest that these fish might come from upstream sources like the Clearwater or Salmon rivers in Idaho, and are simply following the outmigration of juvenile anadromous fish (a food supply) as they emigrate toward the Pacific Ocean. Based on our study results, we recommend abandoning radio telemetry as a tool to monitor bull trout movements in the mainstem Snake River. We do recommend continuing PIT tagging and tag interrogation activities to help determine the origin of bull trout using the Snake River hydropower facilities. As a complementary approach, we also suggest the use of genetic assignment tests to help determine the origin of these fish. Lastly, several recommendations are included in the report to help manage and recover bull trout in the Tucannon subbasin.

  6. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of

  7. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    International Nuclear Information System (INIS)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-01-01

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  8. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-04-02

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  9. 77 FR 13971 - Regulated Navigation Area; MBTA Saugus River Railroad Drawbridge Rehabilitation Project, Saugus...

    Science.gov (United States)

    2012-03-08

    ... waterside restaurants), and vessels who intend to transit in the Saugus River beneath the MBTA Saugus River... standards are technical standards (e.g., specifications of materials, performance, design, or operation...

  10. Impact assessment and mitigation in existing lake regulation projects in the Oulujoki river system

    International Nuclear Information System (INIS)

    Kaatra, K.; Marttunen, M.

    1993-01-01

    The objective of the project was to determine how regulation practices and shore zone maintenance and improvement should be developed in order to give more attention to recreational requirements and factors affecting the aquatic environment. The proposals must not, however, cause flooding damage or significant energy economy losses. The effects of four alternative regulation practices on hydrology flooding damage, recreational utilization, the aquatic, environment, fisheries and the hydropower production were compared in lakes Oulujaervi, Kiantajaervi, Vuokkijaervi, Ontojaervi and Sotkamonjaervi. An extensive sub-study was made on the maintenance and improvement of the shore zones of the regulated lakes. Ways of reducing excessive vegetation were studied in Lake Oulujaervi, and experiments testing the feasibility of various plants in protecting and landscaping the littoral zone were conducted in Lake Ontojaervi. Enquiries in to the perceptions of and the needs for mitigating harmful impacts, as experienced by the people living within the area affected by the river development projects, were also included in the analysis. The alternative regulation practices for Lake Oulujaervi were compared using the decision analysis interview method, in which the data acquired through the environmental impact analysis of effects were combined with the values of the local people and interest groups. The impact of alternative regulation practices was also weighed from the viewpoint of sustainability in various scales. Recommendations were made for regulation patterns and maintenance and improvement programmes for individual lakes

  11. Assessment of heavy metal concentration in water around the proposed Mkuju river uranium project in Tanzania

    International Nuclear Information System (INIS)

    Banzi, F.P.; Msaki, P.K.; Mohammed, N.K.

    2015-01-01

    Effective verification for compliance with water quality standards in uranium mining in Tanzania requires data sensitive to monitor heavy metal concentration in water around the Mkuju River Uranium Project before mining commences. The area susceptible for pollution by the project was estimated using AERMOD dispersion model and found to cover about 1300 km"2. Thirty one surface and groundwater samples were collected and analysed for heavy metals and physicochemical properties using ICP-MS and standards techniques, respectively. The physicochemical properties for water samples analysed ranges from 5.7 to 7.8 for pH, 2.8 to 80.2 mg/L for TDS and 15 to 534.5 mS/cm for EC. These values show that the water in the vicinity of the Mkuju River Uranium Project is normal. The ranges of concentration of heavy metals (µgL"-"1) determined in water ranges were: Al(2 to 9049), Cr(0.2 to 19.96), Mn (0.1 to 1452), Fe(2 to 53890), Co(0.02 to 27.63), Ni(0.2 to 9.7), Cu(2 to 17), Zn(2 to 62.94), As(0.4 to 19.17), Cd(0.02 to 0.14), Pb (0.02 to 78.68), Th (0.002 to 1.73), U(0.002 to 29.76). These values are below the tolerance levels of concentrations set by different International organisations. Therefore heavy metal toxicity in the study area is marginal. The parameters that could serve as baseline data because of their enhanced sensitivity to pollution were (i) concentration of chromium, cobalt, nickel, copper, zinc, arsenic, cadmium and lead in water (ii) pH, TDS and EC for water, (iii) TDS ratio for surface to ground water values and (iv) correlation coefficients between the heavy metals. However, since TDS values are season dependent, this indicator can serve as baseline data when measured during the dry season as was the case in the study. (author)

  12. Monitoring Isotopes in Rivers: Creation of the Global Network of Isotopes in Rivers (GNIR). Results of a Coordinated Research Project 2002-2006

    International Nuclear Information System (INIS)

    2012-03-01

    River runoff plays a key role in human development in all societies through the provision of water for agriculture, industry and domestic use. Although the monitoring of water availability and our understanding of the main hydrological processes at the catchment scale are relatively good, many important aspects, especially those related to the interaction of runoff and groundwater, remain poorly understood. Additionally, the impact of human activities - such as the construction of large reservoirs and diversions, and the redirection of rivers to supply drinking water or water for irrigation or hydropower - are highly relevant and, together with the predicted impact of climate change, are likely to heavily impact local water cycles. The effects of such changes include: limited availability of water; changes in flood or drought frequency; changes in water quality, sediment load and groundwater recharge; and biodiversity loss in riparian environments. Additionally, political disputes may result as water resources become affected in terms of availability and/or quality. In most instances, stable isotopes and other water tracers provide a deeper insight into hydrological processes, especially in aspects related to water pathways, interconnections, transport of water and pollutants, and the transit time of water. To explore the contribution of these techniques in more detail, the IAEA has launched a monitoring programme, the Global Network of Isotopes in Rivers (GNIR), aimed at regular analysis of the isotope composition of runoff in large rivers. This isotope monitoring network complements an earlier precipitation network, the Global Network of Isotopes in Precipitation (GNIP). To prepare for GNIR, the IAEA launched a coordinated research project (CRP) called Design Criteria for a Network to Monitor Isotope Compositions of Runoff in Large Rivers. The main aim of the CRP was to develop a scientific rationale and a protocol for the operation of such a network, as well as

  13. Data summary report on short-term turbidity monitoring of pipeline river crossings in the Moyie River, Boundary County, Idaho: PGT-PG&E Pipeline Expansion Project

    Energy Technology Data Exchange (ETDEWEB)

    Gowdy, M.J.; Smits, M.P.; Wilkey, P.L.; Miller, S.F.

    1994-03-01

    A water-quality monitoring program was implemented for Bechtel Corporation to measure the short-term increases in turbidity in the Moyie River caused by construction activities of the Pacific Gas Transmission-Pacific Gas & Electric Pipeline Expansion Project. Construction of the buried, 42-in.-diameter, steel pipeline, during the summer of 1992, involved eight wet crossings of the Moyie River along the 13-mi section of pipeline immediately south of the Canadian-United States border in Boundary County, Idaho. This report summarizes the sampling and analysis protocol used and gives the results and observations for each of the eight crossings. The data obtained from this monitoring program, in addition to satisfying regulatory requirements for the Pipeline Expansion Project, will contribute to an ongoing long-term study of the Moyie River crossings being performed for the Gas Research Institute by Argonne National Laboratory. The purpose of this document is strictly limited to reporting the results of the monitoring program. Interpretation of the data is not within the scope of this report.

  14. The ICDP Snake River Geothermal Drilling Project: preliminary overview of borehole geophysics

    Science.gov (United States)

    Schmitt, Douglas R.; Liberty, Lee M.; Kessler, James E.; Kuck, Jochem; Kofman, Randolph; Bishop, Ross; Shervais, John W.; Evans, James P.; Champion, Duane E.

    2012-01-01

    Hotspot: The Snake River Geothermal Drilling Project was undertaken to better understand the geothermal systems in three locations across the Snake River Plain with varying geological and hydrological structure. An extensive series of standard and specialized geophysical logs were obtained in each of the wells. Hydrogen-index neutron and γ-γ density logs employing active sources were deployed through the drill string, and although not fully calibrated for such a situation do provide semi-quantitative information related to the ‘stratigraphy’ of the basalt flows and on the existence of alteration minerals. Electrical resistivity logs highlight the existence of some fracture and mineralized zones. Magnetic susceptibility together with the vector magnetic field measurements display substantial variations that, in combination with laboratory measurements, may provide a tool for tracking magnetic field reversals along the borehole. Full waveform sonic logs highlight the variations in compressional and shear velocity along the borehole. These, together with the high resolution borehole seismic measurements display changes with depth that are not yet understood. The borehole seismic measurements indicate that seismic arrivals are obtained at depth in the formations and that strong seismic reflections are produced at lithological contacts seen in the corresponding core logging. Finally, oriented ultrasonic borehole televiewer images were obtained over most of the wells and these correlate well with the nearly 6 km of core obtained. This good image log to core correlations, particularly with regards to drilling induced breakouts and tensile borehole and core fractures will allow for confident estimates of stress directions and or placing constraints on stress magnitudes. Such correlations will be used to orient in core orientation giving information useful in hydrological assessments, paleomagnetic dating, and structural volcanology.

  15. Anacostia River fringe wetlands restoration project: final report for the five-year monitoring program (2003 through 2007)

    Science.gov (United States)

    Krafft, Cairn C.; Hammerschlag, Richard S.; Guntenspergen, Glenn R.

    2009-01-01

    The 6-hectare (ha) freshwater tidal Anacostia River Fringe Wetlands (Fringe Wetlands) were reconstructed along the mainstem of the Anacostia River in Washington, DC (Photograph 1, Figure 1) during the summer of 2003. The Fringe Wetlands consist of two separate planting cells. Fringe A, located adjacent to Lower Kingman Island, on the west bank of the Anacostia River, occupies 1.6 ha; Fringe B, located on the east bank of the Anacostia River, occupies 4.4 ha. This project is the third in a series of freshwater tidal wetland reconstructions on the Anacostia River designed and implemented by the US Army Corps of Engineers (USACE) Baltimore District and District Department of the Environment (DDOE) on lands managed by the National Park Service (NPS). The first was Kenilworth Marsh, reconstructed in 1993 (Syphax and Hammerschlag 2005); the second was Kingman Marsh, reconstructed in 2000 (Hammerschlag et al. 2006). Kenilworth and Kingman were both constructed in low-energy backwaters of the Anacostia. However, the Fringe Wetlands, which were constructed on two pre-existing benches along the high-energy mainstem, required sheet piling to provide protection from erosive impacts of increased flow and volume of water associated with storm events during the establishment phase (Photograph 2). All three projects required the placement of dredged sediment materials to increase elevations enough to support emergent vegetation (Photograph 3). The purpose of all three wetland reconstruction projects was to restore pieces of the once extensive tidal freshwater marsh habitat that bordered the Anacostia River historically, prior to the dredge and fill operations and sea wall installation that took place there in the early to mid-1900's (Photograph 4).

  16. Savannah River Site waste vitrification projects initiated throughout the United States: Disposal and recycle options

    International Nuclear Information System (INIS)

    Jantzen, C.M.

    2000-01-01

    A vitrification process was developed and successfully implemented by the US Department of Energy's (DOE) Savannah River Site (SRS) and at the West Valley Nuclear Services (WVNS) to convert high-level liquid nuclear wastes (HLLW) to a solid borosilicate glass for safe long term geologic disposal. Over the last decade, SRS has successfully completed two additional vitrification projects to safely dispose of mixed low level wastes (MLLW) (radioactive and hazardous) at the SRS and at the Oak Ridge Reservation (ORR). The SRS, in conjunction with other laboratories, has also demonstrated that vitrification can be used to dispose of a wide variety of MLLW and low-level wastes (LLW) at the SRS, at ORR, at the Los Alamos National Laboratory (LANL), at Rocky Flats (RF), at the Fernald Environmental Management Project (FEMP), and at the Hanford Waste Vitrification Project (HWVP). The SRS, in conjunction with the Electric Power Research Institute and the National Atomic Energy Commission of Argentina (CNEA), have demonstrated that vitrification can also be used to safely dispose of ion-exchange (IEX) resins and sludges from commercial nuclear reactors. In addition, the SRS has successfully demonstrated that numerous wastes declared hazardous by the US Environmental Protection Agency (EPA) can be vitrified, e.g. mining industry wastes, contaminated harbor sludges, asbestos containing material (ACM), Pb-paint on army tanks and bridges. Once these EPA hazardous wastes are vitrified, the waste glass is rendered non-hazardous allowing these materials to be recycled as glassphalt (glass impregnated asphalt for roads and runways), roofing shingles, glasscrete (glass used as aggregate in concrete), or other uses. Glass is also being used as a medium to transport SRS americium (Am) and curium (Cm) to the Oak Ridge Reservation (ORR) for recycle in the ORR medical source program and use in smoke detectors at an estimated value of $1.5 billion to the general public

  17. Wind River Watershed Restoration: 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connolly, Patrick J.

    2001-09-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its first year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey--Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW). Following categories given in the FY1999 Statement of Work, the broad categories, the related objectives, and the entities associated with each objective (lead entity in boldface) were as follows: Coordination--Objective 1: Coordinate the Wind River watershed Action Committee (AC) and Technical Advisory Committee (TAC) to develop a prioritized list of watershed enhancement projects. Monitoring--Objective 2: Monitor natural production of juvenile, smolt, and adult steelhead in the Wind River subbasin. Objective 3: Evaluate physical habitat conditions in the Wind River subbasin. Assessment--Objective 4: Assess watershed health using an ecosystem-based diagnostic model that will provide the technical basis to prioritize out-year restoration projects. Restoration--Objective 5: Reduce road related sediment sources by reducing road densities to less than 2 miles per square mile. Objective 6: Rehabilitate riparian corridors, flood plains, and channel morphology to reduce maximum water temperatures to less than 61 F, to increase bank stability to greater than 90%, to reduce bankfull width to depth ratios to less than 30, and to provide natural levels of pools and cover for fish. Objective 7: Maintain and evaluate passage for adult and juvenile steelhead at artificial barriers. Education

  18. Economic corridor of industrial development in Indonesia

    Science.gov (United States)

    Berawi, M. A.; Miraj, P.; Sidqi, H.

    2017-12-01

    Indonesia as an archipelago country categorize its regional development into six corridors from Sumatra, Java, Kalimantan, Sulawesi, Bali-Nusa Tenggara and Papua-Maluku. Currently, industrial development becomes one of the highest contributing factors to the national economic growth. However, each region in the nation experience inequality of development mainly related to the infrastructure sector. Thus, the research aims to develop a sustainable economic corridor by considering the characteristics and its potential. The research uses a qualitative approach through a desk study, benchmarking and in-depth interview. Location Quotient is used for the method of the analysis tool. The results show each characteristic of every corridor in the country. Sumatera as national plantation and processing industry corridor, Java as cyber technology innovation and services center, Kalimantan as national energy reserves and processing, Sulawesi as national aquaculture and processing industry, Bali - Nusa Tenggara as national eco-tourism center, and Papua - Maluku as national ore mining and processing.

  19. Regional Ecological Corridors - MLCCS derived 2008

    Data.gov (United States)

    Minnesota Department of Natural Resources — Identification of potential ecological corridors between the MLCCS derived ecological patches (ear_eco08py3). This was generated using cost / distance analysis,...

  20. VT Electric Transmission Line Corridors - substation points

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  1. 10 years after the largest river restoration project in Northern Europe

    DEFF Research Database (Denmark)

    Astrup Kristensen, Esben Astrup; Kronvang, B.; Wiberg-Larsen, P.

    2014-01-01

    that erosion and sedimentation have changed the cross-sectional profiles over the last 10 years, resulting in a net input of sediment to the lower reaches of the river. However, the change of channel form was a slow process and predicted bank retreat over a 100 year period was only up to 6.8 m. Hence......The lower river Skjern (Denmark) historically contained a large variation in habitats and the river ran through large areas with wetlands, many backwaters, islands and oxbow lakes. During the 1960s the river was channelized and the wetland drained. A restoration during 2001–2002 transformed 19 km...... of channelized river into 26 km meandering river. The short-term effects of this restoration have previously been reported and for this study we revisited the river and with new data evaluated the long-term (10 years) hydrological effects of the restoration. The evaluation was done on three different scales: (1...

  2. Dungeness Crab Dredging Entrainment Studies in the Lower Columbia River, 2002 – 2004: Loss Projections, Salinity Model, and Scenario Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Walter H.; Williams, Greg D.; Skalski, John R.

    2005-01-01

    Dungeness crab studies conducted in 2002 for the Portland District of the U.S. Army Corps of Engineers (Corps) constituted a major step forward in quantifying crab entrainment through statistical projections of adult equivalent loss (AEL) and loss to the fishery (LF) from proposed construction and maintenance dredging in the Columbia River navigation channel (Pearson et al. 2002, 2003). These studies also examined the influence of bottom salinity on crab abundance and entrainment rates. Additional sampling was conducted in 2004 to tighten loss projections, further develop the crab salinity model, and apply the model to assess correlations of entrainment rates and projected losses with seasonal salinity changes.

  3. The anthropogenic nature of present-day low energy rivers in western France and implications for current restoration projects

    Science.gov (United States)

    Lespez, L.; Viel, V.; Rollet, A. J.; Delahaye, D.

    2015-12-01

    As in other European countries, western France has seen an increase in river restoration projects. In this paper, we examine the restoration goals, methods and objectives with respect to the long-term trajectory and understanding of the contemporary dynamics of the small low energy rivers typical of the lowlands of Western Europe. The exhaustive geomorphological, paleoenvironmental and historical research conducted in the Seulles river basin (Normandy) provides very accurate documentation of the nature and place of the different legacies in the fluvial systems we have inherited. The sedimentation rate in the Seulles valley bottom has multiplied by a factor of 20 since the end of the Bronze Age and has generated dramatic changes in fluvial forms. Hydraulic control of the rivers and valley bottoms drainage throughout the last millennium has channelized rivers within these deposits. The single meandering channel which characterizes this river today is the legacy of the delayed and complex effects of long term exploitation of the river basin and the fluvial system. Bring to light that the "naturalness" of the restored rivers might be questioned. Our research emphasizes the gap between the poor knowledge of the functioning of these rivers and the concrete objectives of the restoration works undertaken, including dam and weir removal. Account of the long-term history of fluvial systems is required, not only to produce a pedagogic history of the "river degradation" but more fundamentally (i) to situate the current functioning of the fluvial system in a trajectory to try to identify thresholds and anticipate the potential turning points in a context of climate and land use change, (ii) to understand the role of morphosedimentary legacies on the current dynamics, (iii) to open the discussion on reference functioning or expected states and (iv) to open discussion on the sustainability of ecological restoration. To conclude, we point out the necessity to take into account the

  4. Evaluate Status of Pacific Lamprey in the Clearwater River Drainage, Idaho: Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Cochnauer, Tim; Claire, Christopher

    2002-12-01

    Recent decline of Pacific lamprey Lampetra tridentata adult migrants to the Snake River drainage has focused attention on the species. Adult Pacific lamprey counted passing Ice Harbor Dam fishway averaged 18,158 during 1962-69 and 361 during 1993-2000. Human resource manipulations in the Snake River and Clearwater River drainages have altered ecosystem habitat in the last 120 years, likely impacting the productive potential of Pacific lamprey habitat. Timber harvest, stream impoundment, road construction, grazing, mining, and community development have dominated habitat alteration in the Clearwater River system and Snake River corridor. Hydroelectric projects in the Snake River corridor impact juvenile/larval Pacific lamprey outmigrants and returning adults. Juvenile and larval lamprey outmigrants potentially pass through turbines, turbine bypass/collection systems, and over spillway structures at the four lower Snake River hydroelectric dams. Clearwater River drainage hydroelectric facilities have impacted Pacific lamprey populations to an unknown degree. The Pacific Power and Light Dam on the Clearwater River in Lewiston, Idaho, restricted chinook salmon Oncorhynchus tshawytscha passage in the 1927-1940 period, altering the migration route of outmigrating Pacific lamprey juveniles/larvae and upstream adult migrants (1927-1972). Dworshak Dam, completed in 1972, eliminated Pacific lamprey spawning and rearing in the North Fork Clearwater River drainage. Construction of the Harpster hydroelectric dam on the South Fork of the Clearwater River resulted in obstructed fish passage 1949-1963. Through Bonneville Power Administration support, the Idaho Department of Fish and Game continued investigation into the status of Pacific lamprey populations in Idaho's Clearwater River drainage in 2001. Trapping, electrofishing, and spawning ground redd surveys were used to determine Pacific lamprey distribution, life history strategies, and habitat requirements in the South

  5. Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Riggin, Stacey H.; Hansen, H. Jerome

    1992-10-01

    The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and instream flows are issues of public concern that will be directly affected by the timing and quantity of water rental releases for salmon flow augmentation, The potential of renting water from Idaho rental pools for salmon flow augmentation is complicated by institutional impediments, competition from other water users, and dry year shortages. Water rental will contribute to a reduction in carryover storage in a series of dry years when salmon flow augmentation is most critical. Such a reduction in carryover can have negative impacts on reservoir fisheries by eliminating shoreline spawning beds, reducing available fish habitat

  6. Container cargo simulation modeling for measuring impacts of infrastructure investment projects in Pearl River Delta

    Science.gov (United States)

    Li, Jia-Qi; Shibasaki, Ryuichi; Li, Bo-Wei

    2010-03-01

    In the Pearl River Delta (PRD), there is severe competition between container ports, particularly those in Hong Kong, Shenzhen, and Guangzhou, for collecting international maritime container cargo. In addition, the second phase of the Nansha terminal in Guangzhou’s port and the first phase of the Da Chang Bay container terminal in Shenzhen opened last year. Under these circumstances, there is an increasing need to quantitatively measure the impact these infrastructure investments have on regional cargo flows. The analysis should include the effects of container terminal construction, berth deepening, and access road construction. The authors have been developing a model for international cargo simulation (MICS) which can simulate the movement of cargo. The volume of origin-destination (OD) container cargo in the East Asian region was used as an input, in order to evaluate the effects of international freight transportation policies. This paper focuses on the PRD area and, by incorporating a more detailed network, evaluates the impact of several infrastructure investment projects on freight movement.

  7. Challenges associated with the design of underground grinding plant at McArthur River project

    International Nuclear Information System (INIS)

    Jamrozek, J.S.

    2000-01-01

    McArthur River is an unique high grade uranium underground mine. Ore grinding and thickening are part of the underground operation. The grinding circuit is designed to operate in conditions different from conventional plant environments. Design of the grinding plant was a collective effort of a multi-disciplinary engineering team closely cooperating with project operating personnel. The equipment had to be selected to reflect widely varying ore properties. A user-friendly plant layout provides access to equipment inspections, services, and the delivery of necessary components. The size of the grinding chamber was limited in order to keep the rock stress levels within allowable values. All underground equipment brought to the construction site was restricted in size and weight. Plant construction faced limited storage space underground, tight erection sequencing, and schedule. Plant ventilation is a critical design feature. It efficiently removes radioactive dust from work areas, eliminates stagnant air pockets, and separates clean air from contaminated air areas. Radiation shielding on the equipment is designed to correspond with operational and maintenance functions. Plant operation is remotely controlled and requires little attendance. Video cameras are used on critical equipment and in controlled access areas. An extensive program of preventive and predictive maintenance allows highly reliable plant operation. (author)

  8. The International intraval project. Phase 1 case 8: The Alligator rivers natural analogue

    International Nuclear Information System (INIS)

    Duerden, P.

    1992-01-01

    INTRAVAL is an international coordinated research program for predicting the potential radionuclide migration in the geosphere with the use of mathematical models. Such models are used to help assess the long-term safety of radioactive waste disposal systems. The objective of the Alligator Rivers Analogue Project (ARAP) is to identify and study long-term processes that have been significant in the development of the uranium dispersion zone at the Koongarra uranium ore deposit in the Northern Territory of Australia. This report includes a description of the site geology and gives an outline of the experimental programs, which are aimed to study the hydrogeology and geochemistry of the system, and the distribution of uranium and its daughter radionuclides in the rock strata. The extensive databases that have resulted from these studies have been used to develop and test hydrological, geochemical and transport models. A good basis has been established for modelling the transport of radionuclides in the porous, weathered zone of the Koongarra uranium deposit and its surroundings. A number of preliminary transport, hydrology and geochemical modelling reports are given, with the Koongarra databases also being used to test a Performance Assessment model. The possible application of scenario development procedures to the Koongarra site is discussed. 106 refs., 67 figs., 28 tabs

  9. Hacia directrices y conceptos de diseño de vialidad sustentable: el caso del corredor fluvial del río Mapocho ─sección occidental─ y su entorno. / Guidelines and concepts to design sustainable transportation: the western section of the corridor of the Mapocho River and its environment.

    Directory of Open Access Journals (Sweden)

    María Patricia Henríquez Orellana

    2010-12-01

    Full Text Available Se explora un polígono donde existe un potencial de desarrollo sostenible conteniendo el tramo poniente del río Mapocho, posible de constituirse en un corredor fluvial recreacional y de transporte como uno de los elementos estructuradores metropolitanos. Se trata del uso del espacio corredor del río Mapocho y su entorno inmediato para la integración urbana-regional. La investigación FONDECYT 1090199 – 2009/2010 planteó que resolver la conformación de éste corredor requiere un fortalecimiento integral de la vialidad que mejore la accesibilidad, conectividad y conexidad del corredor, potenciando un sistema vial asociado al río, pero no perturbador del río; diversificado y articulador de actividades pertinentes junto y eventualmente sobre el territorio de la movilidad fluvial; que conecte los asentamientos de borde, contribuya a la producción de espacio público para la recreación y esparcimiento tranquilo de los habitantes, y conjuntamente en las áreas rurales facilite la coexistencia con la actividad agraria y campesina. Esto permitiría la integración plena del río a la vida metropolitana y periurbana de Santiago. Dicha acción requiere ser abordada desde un ordenamiento territorial ambientalmente sustentable y no sólo desde la ingeniería./The western section of the Mapocho river is an especial area for a future sustainable development. The author essay the possibility of this section as a recreational and transportation corridor that could be also a integration node for de city and the region.

  10. Spatio-temporal pattern of schistosomiasis in Anhui Province, East China: Potential effect of the Yangtze River - Huaihe River Water Transfer Project.

    Science.gov (United States)

    Cao, Zhi-Guo; Li, Si; Zhao, Ya-E; Wang, Tian-Ping; Bergquist, Robert; Huang, Yin-Yin; Gao, Feng-Hua; Hu, Yi; Zhang, Zhi-Jie

    2018-05-09

    Anhui Province has been one of typical epidemic areas of schistosomiasis in East China as a wide range of large lake and marshland regions provide an ideal environment for growth and reproduction of the intermediate snail host. With the completion of the Yangtze River-Huaihe River Water Transfer Project (YHWTP), launched by the end of 2016, the epidemic areas are expected to expand and controlling schistosomiasis remains a challenge. Based on annual surveillance data at the county level in Anhui for the period 2006-2015, spatial and temporal cluster analyses were conducted to assess the pattern of risk through spatial (Local Moran's I and flexible scan statistic) and space-time scan statistic (Kulldorff). It was found that schistosomiasis sero-prevalence was dramatically reduced and maintained at a low level. Cluster results showed that spatial extent of schistosomiasis contracted, but snail distribution remained geographically stable across the study area. Clusters, both for schistosomiasis and snail presence, were common along the Yangtze River. Considering the effect of the ongoing YHWTP on the potential spread of schistosomiasis, Zongyang County and Anqing, which will be transected by the new water-transfer route, should be given a priority for strengthened surveillance and control. Attention should also be paid to Guichi since it is close to one of the planned inlets of the YHWTP. Copyright © 2018 Elsevier B.V. All rights reserved.

  11. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  12. Large-Scale Habitat Corridors for Biodiversity Conservation: A Forest Corridor in Madagascar.

    Directory of Open Access Journals (Sweden)

    Tanjona Ramiadantsoa

    Full Text Available In biodiversity conservation, habitat corridors are assumed to increase landscape-level connectivity and to enhance the viability of otherwise isolated populations. While the role of corridors is supported by empirical evidence, studies have typically been conducted at small spatial scales. Here, we assess the quality and the functionality of a large 95-km long forest corridor connecting two large national parks (416 and 311 km2 in the southeastern escarpment of Madagascar. We analyze the occurrence of 300 species in 5 taxonomic groups in the parks and in the corridor, and combine high-resolution forest cover data with a simulation model to examine various scenarios of corridor destruction. At present, the corridor contains essentially the same communities as the national parks, reflecting its breadth which on average matches that of the parks. In the simulation model, we consider three types of dispersers: passive dispersers, which settle randomly around the source population; active dispersers, which settle only in favorable habitat; and gap-avoiding active dispersers, which avoid dispersing across non-habitat. Our results suggest that long-distance passive dispersers are most sensitive to ongoing degradation of the corridor, because increasing numbers of propagules are lost outside the forest habitat. For a wide range of dispersal parameters, the national parks are large enough to sustain stable populations until the corridor becomes severely broken, which will happen around 2065 if the current rate of forest loss continues. A significant decrease in gene flow along the corridor is expected after 2040, and this will exacerbate the adverse consequences of isolation. Our results demonstrate that simulation studies assessing the role of habitat corridors should pay close attention to the mode of dispersal and the effects of regional stochasticity.

  13. 75 FR 52360 - Upper Truckee River Restoration and Golf Course Reconfiguration Project, El Dorado County, CA

    Science.gov (United States)

    2010-08-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Upper Truckee River Restoration and Golf Course... and comment the draft EIR/EIS for the Upper Truckee River Restoration and Golf Course Reconfiguration... include continuing existing golf course use, removal of the entire Lake Tahoe Golf Course, or...

  14. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek, Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety

  15. Working on rail freigt corridors : a trade union manual anticipate - take action - work together

    NARCIS (Netherlands)

    Goudswaard, A.; Torre, W. van der; Verbiest, S.

    2013-01-01

    The European Transport Workers Federation (ETF) put in place in 2013 the project “WOC – Working On Rail Freight Corridors” with the objective to on the one hand raise awareness among ETF affiliates about the developments of the European freight corridors and on the other hand to give the tools to

  16. California air transportation study: A transportation system for the California Corridor of the year 2010

    Science.gov (United States)

    1989-01-01

    To define and solve the problems of transportation in the California Corrider in the year 2010, the 1989 California Polytechnic State University Aeronautical Engineering Senior Design class determined future corridor transportation needs and developed a system to meet the requirements. A market study, which included interpreting travel demand and gauging the future of regional and national air travel in and out of the corridor, allowed the goals of the project to be accurately refined. Comprehensive trade-off studies of several proposed transporation systems were conducted to determine which components would form the final proposed system. Preliminary design and further analysis were performed for each resulting component. The proposed system consists of three vehicles and a special hub or mode mixer, the Corridor Access Port (CAP). The vehicles are: (1) an electric powered aircraft to serve secondary airports and the CAP; (2) a high speed magnetic levitation train running through the CAP and the high population density areas of the corridor; and (3) a vertical takeoff and landing tilt rotor aircraft to serve both intercity and intrametropolitan travelers from the CAP and city vertiports. The CAP is a combination and an extension of the hub, mode mixer, and Wayport concepts. The CAP is an integrated part of the system which meets the travel demands in the corridor, and interfaces with interstate and international travel.

  17. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    International Nuclear Information System (INIS)

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  18. Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

  19. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    International Nuclear Information System (INIS)

    Dunford, Gary; Williams, David; Smith, Rick

    2013-01-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  20. Landscape ecological security assessment based on projection pursuit in Pearl River Delta.

    Science.gov (United States)

    Gao, Yang; Wu, Zhifeng; Lou, Quansheng; Huang, Huamei; Cheng, Jiong; Chen, Zhangli

    2012-04-01

    Regional landscape ecological security is an important issue for ecological security, and has a great influence on national security and social sustainable development. The Pearl River Delta (PRD) in southern China has experienced rapid economic development and intensive human activities in recent years. This study, based on landscape analysis, provides a method to discover the alteration of character among different landscape types and to understand the landscape ecological security status. Based on remotely sensed products of the Landsat 5 TM images in 1990 and the Landsat 7 ETM+ images in 2005, landscape classification maps of nine cities in the PRD were compiled by implementing Remote Sensing and Geographic Information System technology. Several indices, including aggregation, crush index, landscape shape index, Shannon's diversity index, landscape fragile index, and landscape security adjacent index, were applied to analyze spatial-temporal characteristics of landscape patterns in the PRD. A landscape ecological security index based on these outcomes was calculated by projection pursuit using genetic algorithm. The landscape ecological security of nine cities in the PRD was thus evaluated. The main results of this research are listed as follows: (1) from 1990 to 2005, the aggregation index, crush index, landscape shape index, and Shannon's diversity index of nine cities changed little in the PRD, while the landscape fragile index and landscape security adjacent index changed obviously. The landscape fragile index of nine cities showed a decreasing trend; however, the landscape security adjacent index has been increasing; (2) from 1990 to 2005, landscape ecology of the cities of Zhuhai and Huizhou maintained a good security situation. However, there was a relatively low value of ecological security in the cities of Dongguan and Foshan. Except for Foshan and Guangzhou, whose landscape ecological security situation were slightly improved, the cities had reduced

  1. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    Energy Technology Data Exchange (ETDEWEB)

    Dunford, Gary [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, WA 99352 (United States); Williams, David [WIT, Inc., 11173 Oak Fern Court, San Diego, CA 92131 (United States); Smith, Rick [Knowledge Systems Design, Inc., 13595 Quaker Hill Cross Rd, Nevada City, CA 95959 (United States)

    2013-07-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  2. Assessment of Pen Branch delta and corridor vegetation changes using multispectral scanner data 1992--1994

    International Nuclear Information System (INIS)

    1996-01-01

    Airborne multispectral scanner data were used to monitor natural succession of wetland vegetation species over a three-year period from 1992 through 1994 for Pen Branch on the Savannah River Site in South Carolina. Image processing techniques were used to identify and measure wetland vegetation communities in the lower portion of the Pen Branch corridor and delta. The study provided a reliable means for monitoring medium- and large-scale changes in a diverse environment. Findings from the study will be used to support decisions regarding remediation efforts following the cessation of cooling water discharge from K reactor at the Department of Energy's Savannah River Site in South Carolina

  3. Surficial geology and land classification, Mackenzie Valley Transportation Corridor

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, O L; Pilon, J; Veilette, J

    1974-01-01

    The objective of this project, continued from 1971 and 1972 is to provide an inventory of surficial geology and permafrost distribution data pertinent to pipeline construction, road building, and other land use activities that might take place in the Mackenzie Valley Transportation Corridor. Hughes together with N.W. Rutter devoted one month to reconnaissance examination of the area encompassed by this project and Project 710047 (see this report). A primary objective was to insure uniform usage of map-units throughout the 2 areas. Construction on the Mackenzie Highway was examined in order to evaluate terrain performance of various map-units crossed by the highway. Limited geological studies, including shallow borings and measurement of sections, were conducted to supplement field work of 1971 and 1972. J. Veillette conducted diamond drilling in permanently frozen surficial deposits during the period mid-March to mid-April.

  4. Systematic impact assessment on inter-basin water transfer projects of the Hanjiang River Basin in China

    Science.gov (United States)

    Zhou, Yanlai; Guo, Shenglian; Hong, Xingjun; Chang, Fi-John

    2017-10-01

    China's inter-basin water transfer projects have gained increasing attention in recent years. This study proposes an intelligent water allocation methodology for establishing optimal inter-basin water allocation schemes and assessing the impacts of water transfer projects on water-demanding sectors in the Hanjiang River Basin of China. We first analyze water demands for water allocation purpose, and then search optimal water allocation strategies for maximizing the water supply to water-demanding sectors and mitigating the negative impacts by using the Standard Genetic Algorithm (SGA) and Adaptive Genetic Algorithm (AGA), respectively. Lastly, the performance indexes of the water supply system are evaluated under different scenarios of inter-basin water transfer projects. The results indicate that: the AGA with adaptive crossover and mutation operators could increase the average annual water transfer from the Hanjiang River by 0.79 billion m3 (8.8%), the average annual water transfer from the Changjiang River by 0.18 billion m3 (6.5%), and the average annual hydropower generation by 0.49 billion kW h (5.4%) as well as reduce the average annual unmet water demand by 0.40 billion m3 (9.7%), as compared with the those of the SGA. We demonstrate that the proposed intelligent water allocation schemes can significantly mitigate the negative impacts of inter-basin water transfer projects on the reliability, vulnerability and resilience of water supply to the demanding sectors in water-supplying basins. This study has a direct bearing on more intelligent and effectual water allocation management under various scenarios of inter-basin water transfer projects.

  5. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004

  6. Comprehensive highway corridor planning with sustainability indicators : [research summary].

    Science.gov (United States)

    2013-04-01

    The Maryland State Highway Administration (SHA) has initiated major planning : efforts to improve transportation efficiency, safety and sustainability on critical : highway corridors through its Comprehensive Highway Corridor (CHC) program. : It is i...

  7. 77 FR 73734 - Northeast Corridor Safety Committee; Notice of Meeting

    Science.gov (United States)

    2012-12-11

    .... 5] Northeast Corridor Safety Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of a Northeast Corridor Safety... Committee is made up of stakeholders operating on the [[Page 73735

  8. 78 FR 23815 - Northeast Corridor Safety Committee; Notice of Meeting

    Science.gov (United States)

    2013-04-22

    .... 6] Northeast Corridor Safety Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of the Northeast Corridor Safety Committee (NECSC) Meeting. [[Page 23816

  9. Integrated corridor management : implementation guide and lessons learned.

    Science.gov (United States)

    2012-02-01

    This implementation guide is intended for use by adopters of integrated corridor management (ICM) approaches and strategies to address congestion and travel time reliability issues within specific travel corridors. It introduces the topic of ICM and ...

  10. Letter of Intent for River Protection Project (RPP) Characterization Program: Process Engineering and Hanford Analytical Services and Characterization Project Operations and Quality Assurance

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    2000-01-01

    The Characterization Project level of success achieved by the River Protection Project (RPP) is determined by the effectiveness of several organizations across RPP working together. The requirements, expectations, interrelationships, and performance criteria for each of these organizations were examined in order to understand the performances necessary to achieve characterization objectives. This Letter of Intent documents the results of the above examination. It formalizes the details of interfaces, working agreements, and requirements for obtaining and transferring tank waste samples from the Tank Farm System (RPP Process Engineering, Characterization Project Operations, and RPP Quality Assurance) to the characterization laboratory complex (222-S Laboratory, Waste Sampling and Characterization Facility, and the Hanford Analytical Service Program) and for the laboratory complex analysis and reporting of analytical results

  11. Final report: Prototyping a combustion corridor; FINAL

    International Nuclear Information System (INIS)

    Rutland, Christopher J.; Leach, Joshua

    2001-01-01

    The Combustion Corridor is a concept in which researchers in combustion and thermal sciences have unimpeded access to large volumes of remote computational results. This will enable remote, collaborative analysis and visualization of state-of-the-art combustion science results. The Engine Research Center (ERC) at the University of Wisconsin - Madison partnered with Lawrence Berkeley National Laboratory, Argonne National Laboratory, Sandia National Laboratory, and several other universities to build and test the first stages of a combustion corridor. The ERC served two important functions in this partnership. First, we work extensively with combustion simulations so we were able to provide real world research data sets for testing the Corridor concepts. Second, the ERC was part of an extension of the high bandwidth based DOE National Laboratory connections to universities

  12. Radionuclide levels in fish from Lake Athabasca February 1993. Northern River Basins Study project report no.26

    International Nuclear Information System (INIS)

    Smithson, G.

    1993-12-01

    The Northern River Basins Study was initiated through the 'Canada-Alberta-Northwest Territories Agreement Respecting the Peace-Athabasca-Slave River Basin Study, Phase II - Technical Studies' which was signed September 27, 1991. The purpose of the study is to understand and characterize the cumulative effects of development on the water and aquatic environment of the Study Area by coordinating with existing programs and undertaking appropriate new technical studies. This publication reports the method and findings of particular work conducted as part of the Northern River Basins Study. As such, the work was governed by a specific terms of reference and is expected to contribute information about the Study Area within the context of the overall study as described by the Study Final Report. This report has been reviewed by the Study Science Advisory Committee in regards to scientific content and has been approved by the Study Board of Directors for public release. It is explicit in the objectives of the Study to report the results of technical work regularly to the public. This objective is served by distributing project reports to an extensive network of libraries, agencies, organizations and interested individuals and by granting universal permission to reproduce the material. This report contains referenced data obtained from external to the Northern River Basins Study. Individuals interested in using external data must obtain permission to do so from the donor agency. (author). 47 refs., 9 tabs., 2 figs

  13. Radionuclide levels in fish from Lake Athabasca February 1993. Northern River Basins Study project report no.26

    Energy Technology Data Exchange (ETDEWEB)

    Smithson, G [Saskatchewan Research Council, Saskatoon, SK (Canada)

    1993-12-01

    The Northern River Basins Study was initiated through the `Canada-Alberta-Northwest Territories Agreement Respecting the Peace-Athabasca-Slave River Basin Study, Phase II - Technical Studies` which was signed September 27, 1991. The purpose of the study is to understand and characterize the cumulative effects of development on the water and aquatic environment of the Study Area by coordinating with existing programs and undertaking appropriate new technical studies. This publication reports the method and findings of particular work conducted as part of the Northern River Basins Study. As such, the work was governed by a specific terms of reference and is expected to contribute information about the Study Area within the context of the overall study as described by the Study Final Report. This report has been reviewed by the Study Science Advisory Committee in regards to scientific content and has been approved by the Study Board of Directors for public release. It is explicit in the objectives of the Study to report the results of technical work regularly to the public. This objective is served by distributing project reports to an extensive network of libraries, agencies, organizations and interested individuals and by granting universal permission to reproduce the material. This report contains referenced data obtained from external to the Northern River Basins Study. Individuals interested in using external data must obtain permission to do so from the donor agency. (author). 47 refs., 9 tabs., 2 figs.

  14. Variations of Hydrological Regime in the Jingjiang Reach of the Yangtze River after Operation of the Three Gorges Project

    Science.gov (United States)

    Zhu, Y.-H.; Guo, X.-H.; Hu, W.; Qu, G.; He, G.-S.

    2012-04-01

    The Three Gorges Project (TGP) of China has been in operation since 2003. In October 2010 the water level at the Three Gorges Dam (TGD) rose to the normal storage water level of 175 m, indicting the realization of the integrated targets of the TGP in terms of flood protection, electricity generation, navigation, etc. The operation of the TGP has changed the flow and sediment conditions (i.e. the hydrological regime) of the river channel downstream. The 347.2 km Jingjiang Reach, part of the middle reach of the Yangtze River, is very closely dowstream of the TGD and is affected relatively earlier and significant by the project operation. Based on the measured prototype hydrological data from 1950 to 2010, variations of the hydrological regime in the Jingjiang Reach after operation of the TGP are analyzed. The results showing that the runoff of the river is of no clear variation tendency during the last 60 years. However, after the operation of the TGP, the sediment concentration of the flow in the Jingjiang Reach decreased by 75%; coarsening of the suspended load and bed load in the river is evident; the water level at the same flow rate has a tendency to decline, with the margin of decline of the upper Jingjiang Reach being larger than that of the lower Reach, and that at smaller flow rate being larger than at larger flow rate. The flow and sediment diversion from the Yangtze River to the Dongting Lake via the three outlets also has a tendency to decrease; the degree of dcrease of the sediment diversion is much larger than that of the flow diversion. After the operation of the TGP, except the 2006 is a special low flow year, in which the decrease of the ratios of flow and sediment diversion are relatively large, the ratios are of no clear unidirectional variation tendency in the other years. Due to the operation of the TGP, within one year, the flow diversion in October is decreased comparing with that before the operation. Keywords: The Three Gorges Project, the

  15. Light rail project in Copenhagen

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex; Nielsen, Otto Anker

    2006-01-01

    The need for high class public transport service of the increasing travel across the radial urban structure of the greater Copenhagen region was examined through planning of a light rail. The exact corridor (defined as the Ring 2½ corridor) and alignment of the light rail were documented and the ......The need for high class public transport service of the increasing travel across the radial urban structure of the greater Copenhagen region was examined through planning of a light rail. The exact corridor (defined as the Ring 2½ corridor) and alignment of the light rail were documented...... light rail projects...

  16. Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Glaspey, Douglas J.

    2008-01-30

    Incorporates the results of flow tests for geothermal production and injection wells in the Raft River geothermal field in southern Idaho. Interference testing was also accomplished across the wellfield.

  17. Integrated Project Management Planning for the Deactivation of the Savannah River Site F-Canyon Complex

    Energy Technology Data Exchange (ETDEWEB)

    Clark, T.G.

    2000-12-01

    This paper explains the planning process that is being utilized by the Westinghouse Savannah River Company to take the F-Canyon Complex facilities from operations to a deactivated condition awaiting final decommissioning.

  18. Project CHECO Southeast Asia Report. Aerial Protection of Mekong River Convoys in Cambodia

    National Research Council Canada - National Science Library

    Mitchell, William A

    1971-01-01

    ...) shortages in the Khmer Republic (Cambodia) which had resulted from successful enemy attacks on commercial shipping vessels sailing the Mekong River inside Cambodia These attacks, combined with the closure of land Route 4 from the port city...

  19. A modelling framework to project future climate change impacts on streamflow variability and extremes in the West River, China

    Directory of Open Access Journals (Sweden)

    Y. Fei

    2014-09-01

    Full Text Available In this study, a hydrological modelling framework was introduced to assess the climate change impacts on future river flow in the West River basin, China, especially on streamflow variability and extremes. The modelling framework includes a delta-change method with the quantile-mapping technique to construct future climate forcings on the basis of observed meteorological data and the downscaled climate model outputs. This method is able to retain the signals of extreme weather events, as projected by climate models, in the constructed future forcing scenarios. Fed with the historical and future forcing data, a large-scale hydrologic model (the Variable Infiltration Capacity model, VIC was executed for streamflow simulations and projections at daily time scales. A bootstrapping resample approach was used as an indirect alternative to test the equality of means, standard deviations and the coefficients of variation for the baseline and future streamflow time series, and to assess the future changes in flood return levels. The West River basin case study confirms that the introduced modelling framework is an efficient effective tool to quantify streamflow variability and extremes in response to future climate change.

  20. General Reevaluation Report and Environmental Impact Statement for the Blanchard River, Ottawa, Ohio Flood Protection Project

    Science.gov (United States)

    1987-04-01

    Black locust Black willow Honey locust Mulberry Slippery elm Box elder Cottonwood Multiflora rose Green ash Hackberry The U.S. Fish and Wildlife Service...flows in the Blanchard River at Ottawa. The Perry Street bridge was removed in 1951 and replaced by a new bridge at Elm Street that is less restrictive...flood plain. The present tree growth commonly consists of a second growth of spe- cies of elm , maple, and oak. All of the Blanchard River basin lies

  1. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... in the FHWA Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511... Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice clarifies... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Multistate Corridor Operations and...

  2. Habitat corridor utilization by the gray mouse lemur, Microcebus ...

    African Journals Online (AJOL)

    For this, we trapped M. murinus in four forest fragments and mixed tree plantations between the fragments. One of the corridors was ... During four years of study, only one male M.murinus used the Melaleuca corridor, while several M. murinus were caught in the Eucalyptus and the Acacia corridor in 2013. The density of the ...

  3. 77 FR 20690 - Northeast Corridor Safety Committee; Notice of Meeting

    Science.gov (United States)

    2012-04-05

    .... 4] Northeast Corridor Safety Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of the Northeast Corridor Safety... NECSC is made up of stakeholders operating on the Northeast Corridor (NEC), and the purpose of the...

  4. Surface-water-quality assessment of the upper Illinois River basin in Illinois, Indiana, and Wisconsin; project description

    Science.gov (United States)

    Mades, D.M.

    1987-01-01

    In 1986, the U.S. Geological Survey began a National Water-Quality Assessment program to (1) provide nationally consistent descriptions of the current status of water quality for a large, diverse, and geographically distributed part of the Nation's surface- and ground-water resources; (2) define, where possible, trends in water quality; and (3) identify and describe the relations of both status and trends in water quality to natural factors and the history of land use and land- and waste-management activities. The program is presently in a pilot phase that will test and modify, as necessary, concepts and approaches in preparation for possible full implementation of the program in the future. The upper Illinois River basin is one of four basins selected to test the concepts and approaches of the surface-water-quality element of the national program. The basin drains 10,949 square miles of Illinois, Indiana, and Wisconsin. Three principal tributaries are the Kankakee and Des Plaines Rivers that join to form the Illinois River and the Fox River. Land use is predominantly agricultural; about 75 percent of the basin is cultivated primarily for production of corn and soybeans. About 13 percent of the basin is urban area, most of which is located in the Chicago metropolitan area. The population of the basin is about 7 million. About 6 million people live in the Des Plaines River basin. Many water-quality issues in the upper Illinois River basin are related to sediment, nutrients, potentially toxic inorganic and organic constituents, and to water-management practices. Occurrence of sediment and the chemical constituents in the rivers and lakes within the basin has the potential to adversely affect the water's suitability for aquatic life, recreation, or, through the consumption of fish, human health. The upper Illinois River basin project consists of five major activities. The first activity--analysis of existing information and preparation of a report that describes

  5. Alligator Rivers Analogue project. Hydrogeological field studies. Final Report - Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S N [Univ of Arizona, Tucson, Arizona (United States). Dept of Hydrology and Water Resources; Marley, R D [D.B. Stephens and Associates Inc., Albuquerque, NM (United States); Norris, J R [Hydro Geo Chem Inc., Tucson, Arizona (United States)

    1993-12-31

    The hydrogeology of the Koongarra site was interpreted primarily from long-term hydrographs, water-level maps, water injection tests, aquifer pumping tests, logs of boreholes, and chemical analyses of groundwater samples. Data have been collected over a 21-year period starting with test-drilling in 1970. The first intensive period of hydrogeologic investigations was from 1978 through 1981 and was related to anticipated exploitation of uranium ore at Koongarra. The second period was from 1986 through 1991 and was related to the international Alligator Rivers Analogue Project under the direction of the Australian Nuclear Science and Technology Organisation. The conclusion which can be drawn from the chemical data is that water moving out of the No. 1 ore deposit is diluted rapidly with recharge from the surface as it migrates down the hydraulic gradient. Most of the groundwater outside of the ore deposit does not originate from the ore deposit, and flow models which assume unmodified stream tubes extending out of the ore deposit in a downgradient direction do not reflect the true system. Water in the ore deposit itself, must come from slow upward seepage through the fault zone. Owing to the fact that this water must be at least hundreds of years old, observed fluctuations of water levels in the deposit must reflect pressure head variations induced by seasonal recharge to the overlying surficial materials. Water level fluctuations do not signify a yearly displacement of water deep in the system. Water in the deeper part of the ore must be almost static compared to obvious rapid groundwater circulation in the area around PH88. Small changes in pH, temperature and specific electrical conductivity during aquifer tests indicate a complex hydraulic system which has a variable response to pumping as a function of time. Low concentration in tritium and Carbon-14 together with high concentrations of dissolved helium in the groundwaters all suggested strongly that semi static

  6. Alligator Rivers Analogue project. Hydrogeological field studies. Final Report - Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S.N. [Univ of Arizona, Tucson, Arizona (United States). Dept of Hydrology and Water Resources; Marley, R.D. [D.B. Stephens and Associates Inc., Albuquerque, NM (United States); Norris, J.R. [Hydro Geo Chem Inc., Tucson, Arizona (United States)

    1992-12-31

    The hydrogeology of the Koongarra site was interpreted primarily from long-term hydrographs, water-level maps, water injection tests, aquifer pumping tests, logs of boreholes, and chemical analyses of groundwater samples. Data have been collected over a 21-year period starting with test-drilling in 1970. The first intensive period of hydrogeologic investigations was from 1978 through 1981 and was related to anticipated exploitation of uranium ore at Koongarra. The second period was from 1986 through 1991 and was related to the international Alligator Rivers Analogue Project under the direction of the Australian Nuclear Science and Technology Organisation. The conclusion which can be drawn from the chemical data is that water moving out of the No. 1 ore deposit is diluted rapidly with recharge from the surface as it migrates down the hydraulic gradient. Most of the groundwater outside of the ore deposit does not originate from the ore deposit, and flow models which assume unmodified stream tubes extending out of the ore deposit in a downgradient direction do not reflect the true system. Water in the ore deposit itself, must come from slow upward seepage through the fault zone. Owing to the fact that this water must be at least hundreds of years old, observed fluctuations of water levels in the deposit must reflect pressure head variations induced by seasonal recharge to the overlying surficial materials. Water level fluctuations do not signify a yearly displacement of water deep in the system. Water in the deeper part of the ore must be almost static compared to obvious rapid groundwater circulation in the area around PH88. Small changes in pH, temperature and specific electrical conductivity during aquifer tests indicate a complex hydraulic system which has a variable response to pumping as a function of time. Low concentration in tritium and Carbon-14 together with high concentrations of dissolved helium in the groundwaters all suggested strongly that semi static

  7. CHALLENGES AND OPPORTUNITIES--INTEGRATED LIFE-CYCLE OPTIMIZATION INITIATIVES FOR THE HANFORD RIVER PROTECTION PROJECT--WASTE TREATMENT PLANT

    International Nuclear Information System (INIS)

    Auclair, K. D.

    2002-01-01

    This paper describes the ongoing integrated life-cycle optimization efforts to achieve both design flexibility and design stability for activities associated with the Waste Treatment Plant at Hanford. Design flexibility is required to support the Department of Energy Office of River Protection Balance of Mission objectives, and design stability to meet the Waste Treatment Plant construction and commissioning requirements in order to produce first glass in 2007. The Waste Treatment Plant is a large complex project that is driven by both technology and contractual requirements. It is also part of a larger overall mission, as a component of the River Protection Project, which is driven by programmatic requirements and regulatory, legal, and fiscal constraints. These issues are further complicated by the fact that both of the major contractors involved have a different contract type with DOE, and neither has a contract with the other. This combination of technical and programmatic drivers, constraints, and requirements will continue to provide challenges and opportunities for improvement and optimization. The Bechtel National, Inc. team is under contract to engineer, procure, construct, commission and test the Waste Treatment Plant on or ahead of schedule, at or under cost, and with a throughput capacity equal to or better than specified. The Department of Energy is tasked with the long term mission of waste retrieval, treatment, and disposal. While each mission is a compliment and inextricably linked to one another, they are also at opposite ends of the spectrum, in terms of expectations of one another. These mission requirements, that are seemingly in opposition to one another, pose the single largest challenge and opportunity for optimization: one of balance. While it is recognized that design maturation and optimization are the normal responsibility of any engineering firm responsible for any given project, the aspects of integrating requirements and the management

  8. HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

    International Nuclear Information System (INIS)

    Jolly, R; Bruce Martin, B

    2008-01-01

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intraarea

  9. HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jolly, R; Bruce Martin, B

    2008-01-15

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple

  10. From Caspian to Turkey: The Southern European Gas Corridor's Issues

    International Nuclear Information System (INIS)

    Rebiere, Noemie

    2014-01-01

    With the growth of global energy demand and the raise of conflicts for the control of energy resources and supply routes, energy security is becoming a major issue for the European Union, but also for suppliers and transit countries. The recent crisis in Ukraine highlights the role of gas as a strategic weapon in the Russian external policy and reinforces the need of the European countries to diversify energy sources and supply routes. The southern European gas corridor, which carries hydrocarbons of the Caspian region to Europe through Turkey, is as a key project of E.U. and U.S. strategy to ensure the energy security of Europe. However, with the current instability in the Middle East and the difficulty to set-up an agreement in the Iranian nuclear negotiations, the issue of the ability of the southern gas corridor to be supplied with enough amount of resources remains hypothetical. In this respect, this approach analyses the deep interactions between energy issues, territorial security, political aims and economic interests

  11. Project of the avifauna near Senigallia: the Misa River. First year of survey

    Directory of Open Access Journals (Sweden)

    Mauro Mencarelli

    2012-09-01

    Full Text Available This study analyzed the birds of the Misa River terminal part, near Senigallia (AN. We collected 28 point counts placed at a distance of 500 m apart and visited each month. We recorded more than 100 species after the first year of survey: this high number of species is due to the residual river vegetation strip, that offers a refuge to a lot of birds, even during migration. Among the breeding species that are included in Birds Directive Attachment I, we found Alcedo atthis, Lanius collurio and Emberiza hortulana. To be ascertained Dendrocopos minor. Several birds of prey were recorded during spring migration, such as Circus aeruginosus.

  12. Climate change impact on streamflow in large-scale river basins: projections and their uncertainties sourced from GCMs and RCP scenarios

    Science.gov (United States)

    Nasonova, Olga N.; Gusev, Yeugeniy M.; Kovalev, Evgeny E.; Ayzel, Georgy V.

    2018-06-01

    Climate change impact on river runoff was investigated within the framework of the second phase of the Inter-Sectoral Impact Model Intercomparison Project (ISI-MIP2) using a physically-based land surface model Soil Water - Atmosphere - Plants (SWAP) (developed in the Institute of Water Problems of the Russian Academy of Sciences) and meteorological projections (for 2006-2099) simulated by five General Circulation Models (GCMs) (including GFDL-ESM2M, HadGEM2-ES, IPSL-CM5A-LR, MIROC-ESM-CHEM, and NorESM1-M) for each of four Representative Concentration Pathway (RCP) scenarios (RCP2.6, RCP4.5, RCP6.0, and RCP8.5). Eleven large-scale river basins were used in this study. First of all, SWAP was calibrated and validated against monthly values of measured river runoff with making use of forcing data from the WATCH data set and all GCMs' projections were bias-corrected to the WATCH. Then, for each basin, 20 projections of possible changes in river runoff during the 21st century were simulated by SWAP. Analysis of the obtained hydrological projections allowed us to estimate their uncertainties resulted from application of different GCMs and RCP scenarios. On the average, the contribution of different GCMs to the uncertainty of the projected river runoff is nearly twice larger than the contribution of RCP scenarios. At the same time the contribution of GCMs slightly decreases with time.

  13. Risk Assessment of Pollution Emergencies in Water Source Areas of the Hanjiang-to-Weihe River Diversion Project

    Science.gov (United States)

    Liu, Luyao; Feng, Minquan

    2018-03-01

    [Objective] This study quantitatively evaluated risk probabilities of sudden water pollution accidents under the influence of risk sources, thus providing an important guarantee for risk source identification during water diversion from the Hanjiang River to the Weihe River. [Methods] The research used Bayesian networks to represent the correlation between accidental risk sources. It also adopted the sequential Monte Carlo algorithm to combine water quality simulation with state simulation of risk sources, thereby determining standard-exceeding probabilities of sudden water pollution accidents. [Results] When the upstream inflow was 138.15 m3/s and the average accident duration was 48 h, the probabilities were 0.0416 and 0.0056 separately. When the upstream inflow was 55.29 m3/s and the average accident duration was 48 h, the probabilities were 0.0225 and 0.0028 separately. [Conclusions] The research conducted a risk assessment on sudden water pollution accidents, thereby providing an important guarantee for the smooth implementation, operation, and water quality of the Hanjiang-to-Weihe River Diversion Project.

  14. Projected risk of population declines for native fish species in the Upper Mississippi River

    Science.gov (United States)

    Crimmins, S.M.; Boma, P.; Thogmartin, W.E.

    2015-01-01

    Conservationists are in need of objective metrics for prioritizing the management of habitats. For individual species, the threat of extinction is often used to prioritize what species are in need of conservation action. Using long-term monitoring data, we applied a Bayesian diffusion approximation to estimate quasi-extinction risk for 54 native fish species within six commercial navigation reaches along a 1350-km gradient of the upper Mississippi River system. We found a strong negative linear relationship between quasi-extinction risk and distance upstream. For some species, quasi-extinction estimates ranged from nearly zero in some reaches to one in others, suggesting substantial variability in threats facing individual river reaches. We found no evidence that species traits affected quasi-extinction risk across the entire system. Our results indicate that fishes within the upper Mississippi River system face localized threats that vary across river impact gradients. This suggests that conservation actions should be focused on local habitat scales but should also consider the additive effects on downstream conditions. We also emphasize the need for identification of proximate mechanisms behind observed and predicted population declines, as conservation actions will require mitigation of such mechanisms. Published 2014. This article is a U.S. Government work and is in the public domain in the USA.

  15. Savannah River Plant - Project 8980 engineering and design history. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    1957-01-01

    This volume provides an engineering and design history of the 100 area of the Savannah River Plant. This site consisted of five separate production reactor sites, 100-R, P, L, K, and C. The document summarizes work on design of the reactors, support facilities, buildings, siting, etc. for these areas.

  16. Prescribed burning in the Kings River Ecosystem Project Area: lessons learned

    Science.gov (United States)

    David S. McCandliss

    2002-01-01

    The prescribed fire program on the Sierra National Forest is in its infancy. Prescription burning was initiated in 1994 in two 32,000-acre watersheds in the Kings River District of the Sierra National Forest. Primary objectives are to return fire to a more historical role in forest ecosystems and to provide opportunities for scientists from the Pacific Southwest...

  17. Preconstruction radioactivity levels in the vicinity of the proposed Clinch River Breeder Reactor Project

    International Nuclear Information System (INIS)

    1984-05-01

    Routine samples of ground water, river water, and bottom sediment were collected from the Clinch River in 1983 in the preconstruction-construction phase of the CRBRP environmental radiological monitoring program. The water samples analyzed for iodine-131 yielded only a slight indication of the presence of I-131 at levels below the nominal lower limit of detection of 0.5 pCi/L. The only significant radioisotopes identified in sediment samples were 137 Cs, 60 Co, and the naturally occurring 40 K. The results for 137 Cs vary from 2.2 to 10.1 pCi/g (dry weight), while the results for 60 Co range from 0.35 to 1.2 pCi/g (dry weight). With the exception of tritium, no significant radioactivity was detected in ground or surface water at the CRBRP site. Tritium concentrations ranging from 12,667 to 12,823 pCi/L were found in samples of surface water taken from the Clinch River below Melton Hill Dam while samples taken at the dam exhibited tritium levels from 28 to 942 pCi/L. These elevated tritium levels in the Clinch River below Melton Hill Dam are attributable to DOE operations at Oak Ridge. The external gamma radiation levels measured at the CRBRP site averaged 17.4 +- 3.2 mR/quarter for 1983. This is consistent with levels measured at TVA's nonoperating nuclear power plant construction sites. 3 figures, 8 tables

  18. 77 FR 73916 - Regulated Navigation Area; S99 Alford Street Bridge Rehabilitation Project, Mystic River, MA

    Science.gov (United States)

    2012-12-12

    ... against hazardous conditions created by repair work on the S99 Alford Street Bridge across the Mystic... navigation area that was promulgated to protect the public against hazardous conditions created by repair... restaurants), and vessels who intend to transit in the Mystic River beneath the S99 Alford Street Bridge...

  19. Hanford Site River Protection Project (RPP) High-Level Waste Storage

    International Nuclear Information System (INIS)

    KRISTOFZSKI, J.G.

    2000-01-01

    The CH2M HILL Hanford Group (CHG) conducts business to achieve the goals of the U.S. Department of Energy's (DOE) Office of River Protection at the Hanford Site. The CHG is organized to manage and perform work to safely store, retrieve, etc

  20. Sacramento River, Chico Landing to Red Bluff, California Bank Protection Project

    Science.gov (United States)

    1975-01-01

    i onwi de X X X X X X X (Turdus migratorius) Ruby-crowned kinglet Common-Nat i onwide X X X X X (Regulus calendula ) Water pipit Common-Nat i...City. In addition, State Point of Historical Interest, Glenn-011, Swifts Point, is located on the Sacramento River near Hamilton City and Glenn- Oil

  1. 77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Science.gov (United States)

    2012-06-29

    ... 138 feet at all times. The safety zone on the western river bank encompasses all waters of the.... These safety zones will ensure the safety of the all vessels and crew that are working and transiting in... rule or any policy or action of the Coast Guard. Collection of Information This rule calls for no new...

  2. Wind River Watershed restoration: 1999 annual report; ANNUAL

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    2001-01-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its first year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey-Columbia River Research Lab (USGS-CRRL), and WA Department of Fish and Wildlife (WDFW). Following categories given in the FY1999 Statement of Work, the broad categories, the related objectives, and the entities associated with each objective (lead entity in boldface) were as follows: Coordination-Objective 1: Coordinate the Wind River watershed Action Committee (AC) and Technical Advisory Committee (TAC) to develop a prioritized list of watershed enhancement projects. Monitoring-Objective 2: Monitor natural production of juvenile, smolt, and adult steelhead in the Wind River subbasin. Objective 3: Evaluate physical habitat conditions in the Wind River subbasin. Assessment-Objective 4: Assess watershed health using an ecosystem-based diagnostic model that will provide the technical basis to prioritize out-year restoration projects. Restoration-Objective 5: Reduce road related sediment sources by reducing road densities to less than 2 miles per square mile. Objective 6: Rehabilitate riparian corridors, flood plains, and channel morphology to reduce maximum water temperatures to less than 61 F, to increase bank stability to greater than 90%, to reduce bankfull width to depth ratios to less than 30, and to provide natural levels of pools and cover for fish. Objective 7: Maintain and evaluate passage for adult and juvenile steelhead at artificial barriers. Education

  3. Kootenai River Fisheries Investigations: Salmonid Studies Project Progress Report, 2007-2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Paragamian, Vaughn L.; Walters, Jody; Maiolie, Melo [Idaho Department of Fish and Game

    2009-04-09

    This research report addresses bull trout Salvelinus confluentus and Redband trout Oncorhynchus mykiss redd surveys, population monitoring, trout distribution, and abundance surveys in the Kootenai River drainage of Idaho. The bull trout is one of several sport fish native to the Kootenai River, Idaho that no longer supports a fishery. Because bull trout are listed under the Endangered Species Act, population data will be vital to monitoring status relative to recovery goals. Thirty-three bull trout redds were found in North and South Callahan creeks and Boulder Creek in 2007. This is a decrease from 2006 and 2005 and less than the high count in 2003. However, because redd numbers have only been monitored since 2002, the data series is too short to determine bull trout population trends based on redd counts. Redband trout still provide an important Kootenai River sport fishery, but densities are low, at least partly due to limited recruitment. The redband trout proportional stock density (PSD) in 2007 increased from 2006 for a second year after a two-year decline in 2004 and 2005. This may indicate increased recruitment to or survival in the 201-305 mm length group due to the minimum 406 mm (16 inches) length limit initiated in 2002. We conducted 13 redd surveys and counted 44 redband trout redds from May 7 to June 3, 2007 in a 3.8 km survey reach on Twentymile Creek. We surveyed streams in the Kootenai River valley to look for barriers to trout migration. Man-made barriers, for at least part of the year, were found on Caboose, Debt, Fisher, and Twenty Mile creeks. Removing these barriers would increase spawning and rearing habitat for trout and help to restore trout fisheries in the Kootenai River.

  4. Snake River sockeye salmon Sawtooth Valley project: 1992 Juvenile and Adult Trapping Program

    International Nuclear Information System (INIS)

    1992-04-01

    Sockeye salmon (Oncorhynchus nerka) runs in the Snake River Basin have severely declined. Redfish Lake near Stanley, Idaho is the only lake in the drainage known to still support a run. In 1989, two adults were observed returning to this lake and in 1990, none returned. In the summer of 1991, only four adults returned. If no action is taken, the Snake River sockeye salmon will probably cease to exist. On November 20, 1991, the National Marine Fisheries Service (NMFS) declared the Snake River sockeye salmon ''endangered'' (effective December 20, 1991), pursuant to the Endangered Species Act (ESA) of 1973. In 1991, in response to a request from the Idaho Department of Fish and Game and the Shoshone-Bannock Tribes, the Bonneville Power Administration (BPA) funded efforts to conserve and begin rebuilding the Snake River sockeye salmon run. The initial efforts were focused on Redfish Lake in the Sawtooth Valley of southcentral Idaho. The 1991 measures involved: trapping some of the juvenile outmigrants (O. nerka) from Redfish Lake and rearing them in the Eagle Fish Health Facility (Idaho Department of Fish and Game) near Boise, Idaho; Upgrading of the Eagle Facility where the outmigrants are being reared; and trapping adult Snake River sockeye salmon returning to Redfish Lake and holding and spawning them at the Sawtooth Hatchery near Stanley, Idaho. This Environmental Assessment (EA) evaluates the potential environmental effects of the proposed actions for 1992. It has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) of 1969 and section 7 of the ESA of 1973

  5. THE OHIO RIVER VALLEY CO2 STORAGE PROJECT - PRELIMINARY ASSESSMENT OF DEEP SALINE RESERVOIRS AND COAL SEAMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Mudd; Howard Johnson; Charles Christopher; T.S. Ramakrishnan, Ph.D.

    2003-08-01

    This report describes the geologic setting for the Deep Saline Reservoirs and Coal Seams in the Ohio River Valley CO{sub 2} Storage Project area. The object of the current project is to site and design a CO{sub 2} injection facility. A location near New Haven, WV, has been selected for the project. To assess geologic storage reservoirs at the site, regional and site-specific geology were reviewed. Geologic reports, deep well logs, hydraulic tests, and geologic maps were reviewed for the area. Only one well within 25 miles of the site penetrates the deeper sedimentary rocks, so there is a large amount of uncertainty regarding the deep geology at the site. New Haven is located along the Ohio River on the border of West Virginia and Ohio. Topography in the area is flat in the river valley but rugged away from the Ohio River floodplain. The Ohio River Valley incises 50-100 ft into bedrock in the area. The area of interest lies within the Appalachian Plateau, on the western edge of the Appalachian Mountain chain. Within the Appalachian Basin, sedimentary rocks are 3,000 to 20,000 ft deep and slope toward the southeast. The rock formations consist of alternating layers of shale, limestone, dolomite, and sandstone overlying dense metamorphic continental shield rocks. The Rome Trough is the major structural feature in the area, and there may be some faults associated with the trough in the Ohio-West Virginia Hinge Zone. The area has a low earthquake hazard with few historical earthquakes. Target injection reservoirs include the basal sandstone/Lower Maryville and the Rose Run Sandstone. The basal sandstone is an informal name for sandstones that overlie metamorphic shield rock. Regional geology indicates that the unit is at a depth of approximately 9,100 ft below the surface at the project site and associated with the Maryville Formation. Overall thickness appears to be 50-100 ft. The Rose Run Sandstone is another potential reservoir. The unit is located approximately 1

  6. 78 FR 5490 - Draft Environmental Impact Statement for Tuolumne Wild and Scenic River Comprehensive Management...

    Science.gov (United States)

    2013-01-25

    ... achieve NPS goals, while ensuring accessibility, public safety, resource protection, and protection and... throughout the river corridor. The scenic segment below O'Shaughnessy Dam and the Tioga Road corridor east of... interpretation and education at Tuolumne Meadows. Subalpine meadow and riparian areas would be protected from...

  7. An Evaluation of Water and Land Uses in the Kano River Project ...

    African Journals Online (AJOL)

    MICHAEL

    project farmers apply irrigation water and cultivate land to the levels specified by the project ... to efficient performance of the irrigation project, and, hence a threat to a sustainable irrigation development. @JASEM ... sectors and for implementation and management of ..... complex innovations, which require a lot of time for.

  8. Evaluating effectiveness and constraints of private sector agricultural extension services of the Green River Project in Imo and Rivers States, Nigeria

    Directory of Open Access Journals (Sweden)

    Onyinyechi I. Ogbonna

    2016-08-01

    Full Text Available Background: Oil exploration operations decreased the cultivable lands of rural people in the study area, leading to the establishment of the Green River Project (GRP. This study assessed the effectiveness and constraints of private sector extension services of GRP in Imo and Rivers States, Nigeria. Objectives: To analyse the roles and effectiveness of, as well as constraints to, the GRP in the area. Method: A multistage sampling technique was used to select 120 respondents. Descriptive statistics, factor analysis, chi square and t-test were used to analyse the data. Results: Roles of GRP in farming technologies dissemination included training of farmers on fish pond construction technique and maintenance of good pH levels. There was significant improvement in standard of living (X2 = 15.7; p ≤ 0.05 and size of production (t = 6.398; p ≤ 0.05 of the respondents after participation. In terms of the effectiveness of private sector deliveries on public policies, the programme had effect on beneficiaries’ access to credit, education of wards and poverty reduction. But it is worthy to note that the observed changes may not have been solely caused by the GRP, given that there could be many other factors affecting fish farming, either positively or negatively. Serious implementation constraints to effective performance of GRP included organisational, input and sustainability constraints. Conclusion: It was recommended that there should be timely provision of sufficient inputs to farmers and measures to improve organisation of private sector extension services in the area in order to enhance development.

  9. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  10. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  11. 2005 River Corridor Cleanup Contractor Revegetation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    A. L. Johnson

    2005-09-12

    This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

  12. Polychlorinated Biphenyl Presence in the Columbia River Corridor

    Energy Technology Data Exchange (ETDEWEB)

    R. M. Hermann

    2007-09-06

    The U. S. Department of Energy (DOE) is required by Comprehensive Environmental Response, Compensation, and Liability Act of 1980 regulations to develop a conceptual understanding of potential contaminant releases from the Hanford Site based on an evaluation of existing data and known historical practices. Polychlorinated biphenyls (PCBs) are one environmental contaminant potentially released through leaks, spills, or disposal. This document presents a summary of selected relevant existing information, including environmental studies and Hanford Site analytical data.

  13. Reclaiming deserted corridors: Rights of way as common property resources

    International Nuclear Information System (INIS)

    Brown, D.T.

    1993-01-01

    In Canada, power line transmission corridors are administered and maintained by provincial crown utilities. These corridors have fragmented natural habitats, destroyed biota, and disrupted geological and hydrologic systems. The practices used by utilities to maintain their rights-of-way tend to worsen the environmental and social context of the localities affected by the corridors. If the corridors are considered as common resources, and if co-management of these resources is undertaken involving the utilities and the communities affected by the corridors, public rights-of-way would be created which would have environmental benefits. These corridors would have a recreational potential and could be managed so as to reduce considerably the negative impacts presently generated by current right-of-way management practices. The use of local residents in this management process could ensure that the use of the corridors harmonizes with local needs. Among the obstacles to the co-management of these corridors are the badly defined policies of secondary land use, the restrictions on vegetation maintenance in utility corridors, lengthy approvals processes, and concerns about public liability. To make co-management of these corridors a reality, new policy structures and new procedures have to be developed in cooperation with the utilities and the affected communities. 14 refs., 1 fig

  14. Savannah River Plant Low-Level Waste Heat Utilization Project preliminary analysis. Volume I. Executive summary

    International Nuclear Information System (INIS)

    1978-11-01

    A preliminary feasibility study of capturing energy ejected in hot water at the Savannah River Plant (SRP) is presented. The cooling water, drawn from the river or a pond at the rate of 500,000 gallons per minute, is typically heated 80 0 F to about 150 0 F and is then allowed to cool in the atmosphere. The energy added to the water is equivalent to 20 million barrels of oil a year. This study reports that the reject heat can be used directly in an organic Rankine cycle system to evaporate fluids which drive electric generators. The output of one reactor can produce 45,000 kilowatts of electricity. Since the fuel is waste heat, an estimated 45% savings over conventional electric costs is possible over a thirty year period

  15. Update of preconstruction radioactivity levels in the vicinity of the proposed Clinch River breeder reactor project

    International Nuclear Information System (INIS)

    1981-08-01

    Routine samples of ground water, river water, and bottom sediment were collected from the Clinch River in 1977 in the preconstruction-construction phase of the CRBRP environmental radiological monitoring program. The results obtained from the analysis of these samples are similar to those reported earlier. The only significant radioisotopes identified in sediment samples were 137 Cs, 60 Co, and the naturally occurring 40 K. Other than for samples collected in November 1976, the results vary from 0.1 to 13.0 pCi/g (dry weight), with concentration generally increasing with distance downstream from CRM 24.0 to CRM 14.4. The extent to which this relationship may or may not hold below CRM 14.4 is beyond the intended scope of this program. No explanation can be given at this time for the elevated levels of 137 Cs detected in November 1976. These values ranged from 28.0 to 82.6 pCi/g (dry weight), with similar values found at CRM 24.0 above Melton Hill Dam. With the exception of tritium, no significant radioactivity was detected in ground or surface water at the CRBRP site. Tritium concentrations ranging from 368 to 5882 pCi/l were found in samples of surface water taken from the Clinch River below Melton Hill Dam while samples taken above the dam exhibited tritium levels from 56 to 368 pCi/l. These elevated tritium levels in the Clinch River below Melton Hill Dam are attributable to DOE operations at Oak Ridge

  16. Evaluation of Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2010

    Science.gov (United States)

    2012-05-01

    LEOR Leersia oryzoides Rice cutgrass OBL Grass yes LEMI Lemna minor Duckweed OBL Herb yes LEVU Leucanthemum vulgare Oxeye daisy UPL Herb no yes...discharge today of 7,730 m3/s (Stanford et al. 2005). Historical flows, prior to river regulation by some 30 major dams and numerous minor dams...dominated by reed canarygrass. The changes between years were relatively minor , with one plot changing from 50% Lyngbye’s sedge and 50% reed

  17. Columbia River : Select Area Fishery Evaluation project : 1995-96 Annual Reports.

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, Paul; Miller, Marc; Hill, Jim

    1998-06-01

    Water quality monitoring was conducted from November 1994 through October 1996 at five Oregon and three Washington select area study sites in the lower Columbia River. Physicochemical monitoring and aquatic biomonitoring programs were established to profile baseline parameters at each study site and document differences between study sites. Data collected at study sites where fish rearing operations were initiated indicate a potential negative impact on the surrounding benthic invertebrate communities.

  18. Surface water-quality assessment of the lower Kansas River basin, Kansas and Nebraska; project description

    Science.gov (United States)

    Stamer, J.K.; Jordan, P.R.; Engberg, R.A.; Dugan, J.T.

    1987-01-01

    In 1986 the U.S. Geological Survey began a National Water-Quality Assessment Program to: (1) provide nationally consistent descriptions of the current status of water quality for a large, diverse, and geographically distributed part of the Nation 's surface water resources; (2) where possible, define trends in water quality; and (3) identify and describe the relation between water quality and natural and land use factors. This report describes the pilot study of the lower Kansas River basin, which is one of four surface water pilot studies that will be used to test, and modify as necessary, assessment concepts and approaches in preparation for future full implementation of the national program. Water quality issues in the lower Kansas River basin are dominated by possible nonpoint sources of contamination from agricultural land, with issues including: (1) large sediment discharge in the streams and sediment deposition in the reservoirs caused by intensive cultivation of row crops and subsequent erosion; (2) occurrence of pesticides in streams and reservoirs that could impair the suitability of water for aquatic life and has the potential for impairing the water 's suitability for public supply; (3) bacterial contamination caused by runoff from pastureland and feedlot operations and municipal wastewater discharges; and (4) nutrient enrichment of reservoirs. Data from fixed stations will be used to determine frequency distributions of constituent concentrations and mass balances of constituents between stations. Subbasin or river reach studies will provide a better understanding of the origin, movement, and fate of potential contaminants. (Lantz-PTT)

  19. Landscape susceptibility, hazard and risk assessments along pipeline corridors in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Blais-Stevens, A.; Couture, R.; Page, A. [Natural Resources Canada, Ottawa, ON (Canada). Geological Survey of Canada; Koch, J.; Clague, J.J. [Simon Fraser Univ., Burnaby, BC (Canada); Lipovsky, P.S. [Yukon Geological Survey, Whitehorse, YT (Canada)

    2010-07-01

    This article discussed work that was carried out to inventory landslides and assess hazards along two proposed gas-pipeline routes in the North. Landslide inventories and hazard assessments are necessary to quantify and qualify the risk of environmental impacts from landslides on linear infrastructure. The Yukon Alaska Highway Pipeline and the Mackenzie Gas Project Pipeline, which will both be over 800 kilometres in length, will cross harsh landscapes characterized by permafrost terrain and will be at risk from geological hazards, including landslides with debris flows, earthquakes, subsidence, and permafrost degradation. The work involved inventorying and mapping landslides via aerial photography and field visits to identify the frequency-magnitude relationships for debris flow fans along the route and the creation of qualitative parametric landslide maps for both proposed pipeline corridors. A good correlation was found between actual landslide distribution and the landslide susceptibility maps. For the Mackenzie Valley Pipeline Corridor, most landslides have occurred in fine unconsolidated sediments and shallow slopes. Landslides in the Yukon Alaska Highway Corridor mostly happened in unconsolidated sediments, but a few took place in bedrock with high relief. The preliminary investigation revealed that a slope hazard exists in both corridors and must be taken into account during pipeline development. The results are intended to facilitate better decision-making for planning, constructing, and maintaining safe and economically viable pipeline routes in Northern Canada. The mapping methodology was outlined. 13 refs., 1 tab., 6 figs.

  20. Significance and effect of ecological rehabilitation project in inland river basins in northwest China.

    Science.gov (United States)

    Wang, Yu; Feng, Qi; Chen, Lijuan; Yu, Tengfei

    2013-07-01

    The Ecological Water Transfer and Rehabilitation Project in the arid inland area of northwest China is an important measure in restoring a deteriorated ecosystem. However, the sustainability of the project is affected by many socio-economic factors. This article examines the attitudes of the local populace toward the project, its impact on the livelihood of the people, and the positive effects of water-efficient agricultural practices in Ejina County. Related data were collected through questionnaire surveys and group discussions. The results identified three critical issues that may influence the sustainability of the project in the study area. The first issue relates to the impact of the project on the livelihood of local herdsmen. The potential for the sustainability of the project is compromised because the livelihood of the herdsmen greatly depends on the compensation awarded by the project. The second issue is that the project did not raise the water resource utilization ratio, which may undermine its final purpose. Finally, the compensation provided by the project considers losses in agriculture, but neglects the externalities and public benefit of eco-water. Thus, appropriate compensation mechanisms should be established and adopted according to local economic, environmental, and social conditions. Some recommendations for improving the sustainability of the project are provided based on the results of this study.

  1. Large-scale dam removal in the northeast United States: documenting ecological responses to the Penobscot River Restoration Project

    Science.gov (United States)

    Collins, M. J.; Aponte Clarke, G.; Baeder, C.; McCaw, D.; Royte, J.; Saunders, R.; Sheehan, T.

    2012-12-01

    The Penobscot River Restoration Project aims to improve aquatic connectivity in New England's second largest watershed ( 22,000 km2) by removing the two lowermost, mainstem dams and bypassing a third dam on a principal tributary upstream. Project objectives include: restoring unobstructed access to the entire historic riverine range for five lower river diadromous species including Atlantic and shortnose sturgeon; significantly improving access to upstream habitat for six upper river diadromous species including Atlantic salmon; reconnecting trophic linkages between headwater areas and the Gulf of Maine; restoring fluvial processes to the former impoundments; improving recreational and Penobscot Nation cultural opportunities; and maintaining basin-wide hydropower output. The project is expected to have landscape-scale benefits and the need for a significant investment in long-term monitoring and evaluation to formally quantify ecosystem response has been recognized. A diverse group of federal, state, tribal, NGO, and academic partners has developed a long-term monitoring and evaluation program composed of nine studies that began in 2009. Including American Recovery and Reinvestment Act (ARRA) funding that leveraged partner contributions, we have invested nearly $2M to date in pre- and post-removal investigations that evaluate geomorphology/bed sediment, water quality, wetlands, and fisheries. Given the number of affected diadromous species and the diversity of their life histories, we have initiated six distinct, but related, fisheries investigations to document these expected changes: Atlantic salmon upstream and downstream passage efficiency using passive integrated transponder (PIT) and acoustic telemetry; fish community structure via an index of biotic integrity (IBI); total diadromous fish biomass through hydroacoustics; shortnose sturgeon spawning and habitat use via active and passive acoustic telemetry; and freshwater-marine food web interactions by

  2. Captive Rearing Program for Salmon River Chinook Salmon, 2000 Project Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Venditti, David A.

    2002-04-01

    During 2000, the Idaho Department of Fish and Game (IDFG) continued to develop techniques to rear chinook salmon Oncorhynchus tshawytscha to sexual maturity in captivity and to monitor their reproductive performance under natural conditions. Eyed-eggs were collected to establish captive cohorts from three study streams and included 503 eyed-eggs from East Fork Salmon River (EFSR), 250 from the Yankee Fork Salmon River, and 304 from the West Fork Yankee Fork Salmon River (WFYF). After collection, the eyed-eggs were immediately transferred to the Eagle Fish Hatchery, where they were incubated and reared by family group. Juveniles collected the previous summer were PIT and elastomer tagged and vaccinated against vibrio Vibrio spp. and bacterial kidney disease before the majority (approximately 75%) were transferred to the National Marine Fisheries Service, Manchester Marine Experimental Station for saltwater rearing through sexual maturity. Smolt transfers included 158 individuals from the Lemhi River (LEM), 193 from the WFYF, and 372 from the EFSR. Maturing fish transfers from the Manchester facility to the Eagle Fish Hatchery included 77 individuals from the LEM, 45 from the WFYF, and 11 from the EFSR. Two mature females from the WFYF were spawned in captivity with four males in 2000. Only one of the females produced viable eggs (N = 1,266), which were placed in in-stream incubators by personnel from the Shoshone-Bannock Tribe. Mature adults (N = 70) from the Lemhi River were released into Big Springs Creek to evaluate their reproductive performance. After release, fish distributed themselves throughout the study section and displayed a progression of habitat associations and behavior consistent with progressing maturation and the onset of spawning. Fifteen of the 17 suspected redds spawned by captive-reared parents in Big Springs Creek were hydraulically sampled to assess survival to the eyed stage of development. Eyed-eggs were collected from 13 of these, and

  3. The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project

    International Nuclear Information System (INIS)

    Presgrove, S.B.

    1992-01-01

    The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref

  4. The effects of site, supplemental food, and age on survivorship of Carolina Chickadees and implications for dispersal through- riparian corridors

    Science.gov (United States)

    Doherty, P.F.; Grubb, T.G.

    2000-01-01

    Few studies have examined survivorship of animals in forest fragments differing in size, and none has used appropriate mark-recapture analysis techniques taking into account probability of recapture. Using Program MARK, a flexible mark-recapture software package, we estimated annual survival rates of Carolina Chickadees over a 5-yr period in a fragmented landscape in Ohio. The probability of survival was related to site (riparian woodland or woodlot area) and increased with the presence of supplemental food. While there was little evidence for an age difference in apparent survival in woodlots, young birds appeared to survive less well in forested river corridors. This last result was quite likely due, at least in part, to age-specific dispersal, suggesting that river corridors function as important dispersal routes for young birds.

  5. John Day River Subbasin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Russ M.; Delano, Kenneth H.

    2004-04-01

    Work undertaken in 2003 included: (1) Seven new fence projects were completed thereby protecting 7.6 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) Maintenance of all active project fences (66.14 miles), watergaps (66), spring developments (33) and plantings were checked and repairs performed. (4) Since the initiation of the Fish Habitat Project in 1984 we have 72.94 miles of stream protected using 131.1 miles of fence. With the addition of the Restoration and Enhancement Projects we have 205.96 miles of fence protecting 130.3 miles of stream.

  6. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  7. Otter Brook Lake, New Hampshire Connecticut River Basin, Flood Control Project, Solid Waste Management Plan

    National Research Council Canada - National Science Library

    1996-01-01

    .... This plan provides guidance to establish policies, and responsibilities, procedures, and instructions for proper handling, storage, disposal and recycling of solid waste generated at the flood control project...

  8. Uncertainty of runoff projections under changing climate in Wami River sub-basin

    Directory of Open Access Journals (Sweden)

    Frank Joseph Wambura

    2015-09-01

    New Hydrological Insights for the Region: The results of projected streamflow shows that the baseline annual climatology flow (ACF is 98 m3/s and for the future, the median ACF is projected to be 81 m3/s. At 100% uncertainty of skilled projections, the ACF from the sub-basin is projected to range between −47% and +36% from the baseline ACF. However, the midstream of the sub-basin shows reliable water availability for foreseen water uses expansion up to the year 2039.

  9. Northeast Asian Energy Corridor Initiative for Regional Collaboration

    Directory of Open Access Journals (Sweden)

    Paik Hoon

    2012-12-01

    Full Text Available For historical and political reasons, South Korea (hereafter Korea, Japan and China have not achieved much progress in regional energy cooperation for decades. However, the rising importance of Northeast Asia (NEA in the world energy sphere, especially in the global oil market, is providing an opportunity to create an integrated oil market in the region. This study suggests the Northeast Asian Energy Corridor (NEAEC Initiative as an effective conduit for raising the possibility of the Northeast Asian oil hub project. The NEAEC Initiative combines the model of Europe's Amsterdam-Rotterdam-Antwerp (ARA with Singapore's AsiaClear as a form of financial collaboration. The study suggests that an elFor historical and political reasons, South Korea (hereafter Korea, Japan and China have not achieved much progress in regional energy cooperation for decades. However, the rising importance of Northeast Asia (NEA in the world energy sphere, especially in the global oil market, is providing an opportunity to create an integrated oil market in the region. This study suggests the Northeast Asian Energy Corridor (NEAEC Initiative as an effective conduit for raising the possibility of the Northeast Asian oil hub project. The NEAEC Initiative combines the model of Europe's Amsterdam-Rotterdam-Antwerp (ARA with Singapore’s AsiaClear as a form of financial collaboration. The study suggests that an electronically integrated Over-the-Counter (OTC market clearing mechanism accompanied by other key financial instruments among Korea, Japan and China can be an effective means for promoting financial collaboration in the region.

  10. Accounting for downscaling and model uncertainty in fine-resolution seasonal climate projections over the Columbia River Basin

    Science.gov (United States)

    Ahmadalipour, Ali; Moradkhani, Hamid; Rana, Arun

    2018-01-01

    Climate change is expected to have severe impacts on natural systems as well as various socio-economic aspects of human life. This has urged scientific communities to improve the understanding of future climate and reduce the uncertainties associated with projections. In the present study, ten statistically downscaled CMIP5 GCMs at 1/16th deg. spatial resolution from two different downscaling procedures are utilized over the Columbia River Basin (CRB) to assess the changes in climate variables and characterize the associated uncertainties. Three climate variables, i.e. precipitation, maximum temperature, and minimum temperature, are studied for the historical period of 1970-2000 as well as future period of 2010-2099, simulated with representative concentration pathways of RCP4.5 and RCP8.5. Bayesian Model Averaging (BMA) is employed to reduce the model uncertainty and develop a probabilistic projection for each variable in each scenario. Historical comparison of long-term attributes of GCMs and observation suggests a more accurate representation for BMA than individual models. Furthermore, BMA projections are used to investigate future seasonal to annual changes of climate variables. Projections indicate significant increase in annual precipitation and temperature, with varied degree of change across different sub-basins of CRB. We then characterized uncertainty of future projections for each season over CRB. Results reveal that model uncertainty is the main source of uncertainty, among others. However, downscaling uncertainty considerably contributes to the total uncertainty of future projections, especially in summer. On the contrary, downscaling uncertainty appears to be higher than scenario uncertainty for precipitation.

  11. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  12. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  13. Aerial gamma ray and magnetic survey: Powder River II Project, Gillette Quadrangle, Wyoming. Final report

    International Nuclear Information System (INIS)

    1979-04-01

    The Gillette quadrangle in northeastern Wyoming and western South Dakota contains approximately equal portions of the Powder River Basin and the Black Hills Uplift. In these two structures, a relatively thick sequence of Paleozoic and Mesozoic strata represent nearly continuous deposition over the Precambrian basement complex. The Powder River Basin also contains a thick sequence of early Tertiary rocks which cover about 50% of the surface. A stratigraphic sequence from Upper Cretaceous to Precambrian is exposed in the Black Hills Uplift to the east. Magnetic data apparently illustrate the relative depth to the Precambrian crystalline rocks, but only weakly define the boundary between the Powder River Basin and the Black Hills Uplift. The positions of some small isolated Tertiary intrusive bodies in the Black Hills Uplift are relatively well expressed. The Gillette quadrangle has been productive in terms of uranium mining, but its current status is uncertain. The producing uranium deposits occur within the Lower Cretaceous Inyan Kara Group and the Jurassic Morrison Formation in the Black Hills Uplift. Other prospects occur within the Tertiary Wasatch and Fort Union Formations in the Pumpkin Buttes - Turnercrest district, where it extends into the quadrangle from the Newcastle quadrangle to the south. These four formations, all predominantly nonmarine, contain all known uranium deposits in the Gillette quadrangle. A total of 108 groups of sample responses in the uranium window constitute anomalies as defined in Volume I. The anomalies are most frequently found in the Inyan Kara-Morrison, Wasatch and Fort Union Formations. Many anomalies occur over known mines or prospects. Others may result from unmapped uranium mines or areas where material other than uranium is mined. The remainder may relate to natural geologic features

  14. John Day River Subbasin Fish Habitat Enhancement Project, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Russ M.; Jerome, James P.; Delano, Kenneth H.

    2003-03-01

    Work undertaken in 2002 included: (1) Seven new fence projects were completed thereby protecting 6.0 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) New fence construction (300ft) plus one watergap on Indian Creek/ Kuhl property. (4) Maintenance of all active project fences (58.76 miles), watergaps (56), spring developments (32) and plantings were checked and repairs performed. (5) Restoration and Enhancement projects protected 3 miles of stream within the basin. (6) Since the initiation of the Fish Habitat Project in 1984 we have 67.21 miles of stream protected using 124.2 miles of fence. With the addition of the Restoration and Enhancement Projects we have 199.06 miles of fence protecting 124.57 miles of stream.

  15. Ecological response of a multi-purpose river development project using macro-invertebrates richness and fish habitat value[Dissertation 3807

    Energy Technology Data Exchange (ETDEWEB)

    Pellaud, M.

    2007-05-15

    It has been acknowledged that river morphology and hydrology have been intensively altered due to the anthropic demands in floodplain land use and management, flood protection, promotion of navigability or energy production. Rivers were transformed in water highways, having lost contact with their surrounding floodplain as well as the plethora of ecological processes and occupants once thriving in these ecotonal zones. The identification of this emerging threat of morphological and hydrological alteration on ecological integrity adds further complexity in the exploitation of hydrosystem resources. These resources are heavily coveted and guarded by different lobbies each having strategic views on future project development. Stakeholders may want to promote hydro-electricity, ecologists a natural reserve, communes may wish to have an increased flood protection and leisure promoters a nautical center. As a result, the proposition of a river development project is certain to face opposition of one party or the other. The motivations of this dissertation are anchored in this context, where various and sometimes conflicting potentials for hydrosystem exploitation remain. This works aims at contributing scientifically to an innovative approach at the conception phase of a multi-purpose river development project by developing the ecological module to be implemented in the general project's optimizer. The SYNERGIE project hypothesis is that it should be possible to identify a synergetic pattern joining the interests of ecological integrity, flood safety, energy production and leisure development. Such a multi-objective river development project would stand more chance of acceptance. This dissertation focuses on the ecological aspects of such a river development project and an application on the regulated Swiss Upper Rhone River. Is expected an ecological answer to a river development project design / management which has to be compatible with Heller's Heller (2007

  16. KPI Building Blocks For Successful Green Transport Corridor Implementation

    Directory of Open Access Journals (Sweden)

    Prause Gunnar

    2015-12-01

    Full Text Available The green transport corridor concept represents a cornerstone in the development of integrated and sustainable transport solutions. Important properties of green corridors are their transnational character and their high involvement of large numbers of public and private stakeholders, including political level, requiring sophisticated approaches for implementation, management and governance. The current scientific discussion focusses on Key Performance Indicators (KPI for monitoring and management of green transport corridor performance emphasizing the operational aspects.

  17. Emerging and Legacy Contaminants in The Foodweb in The Lower Columbia River: USGS ConHab Project

    Science.gov (United States)

    Nilsen, E. B.; Alvarez, D.; Counihan, T.; Elias, E.; Gelfenbaum, G. R.; Hardiman, J.; Jenkins, J.; Mesa, M.; Morace, J.; Patino, R.; Torres, L.; Waite, I.; Zaugg, S.

    2012-12-01

    An interdisciplinary study, USGS Columbia River Contaminants and Habitat Characterization (ConHab) project, investigates transport pathways, chemical fate, and effects of polybrominated diphenyl ethers (PBDEs) and other endocrine disrupting chemicals (EDCs) in aquatic media and the foodweb in the lower Columbia River, Oregon and Washington. Polar organic chemical integrative samplers (POCIS) and semipermeable membrane devices (SPMDs) were co-deployed at each of 10 sites in 2008 to provide a measure of the dissolved concentrations of select PBDEs, chlorinated pesticides, and other EDCs. PBDE-47 was the most prevalent of the PBDEs detected. Numerous organochlorine pesticides, both banned and current-use, including hexachlorobenzene, pentachloroanisole, dichlorodiphenyltrichloroethane (DDT) and its degradates, chlorpyrifos, endosulfan, and the endosulfan degradation products, were measured at each site. EDCs commonly detected included a series of polycyclic aromatic hydrocarbons (PAHs), fragrances (galaxolide), pesticides (chlorpyrifos and atrazine), plasticizers (phthalates), and flame retardants (phosphates). The downstream sites tended to have the highest concentrations of contaminants in the lower Columbia River. In 2009 and 2010 passive samplers were deployed and resident largescale suckers (Catostomus macrocheilus) and surface bed sediments were collected at three of the original sites representing a gradient of exposure based on 2008 results. Brain, fillet, liver, stomach, and gonad tissues were analyzed. Chemical concentrations were highest in livers, followed by brain, stomach, gonad, and, lastly, fillet. Concentrations of halogenated compounds in tissue samples ranged from PBDE-100 > PBDE-154 > PBDE-153. Concentrations in tissues and in sediments increased moving downstream from Skamania, WA to Columbia City, OR to Longview, WA. Preliminary biomarker results indicate that fish at the downstream sites experience greater stress relative to the upstream site

  18. Climate Change and River Ecosystems: Protection and Adaptation Options

    Science.gov (United States)

    Palmer, Margaret A.; Lettenmaier, Dennis P.; Poff, N. Leroy; Postel, Sandra L.; Richter, Brian; Warner, Richard

    2009-12-01

    Rivers provide a special suite of goods and services valued highly by the public that are inextricably linked to their flow dynamics and the interaction of flow with the landscape. Yet most rivers are within watersheds that are stressed to some extent by human activities including development, dams, or extractive uses. Climate change will add to and magnify risks that are already present through its potential to alter rainfall, temperature, runoff patterns, and to disrupt biological communities and sever ecological linkages. We provide an overview of the predicted impacts based on published studies to date, discuss both reactive and proactive management responses, and outline six categories of management actions that will contribute substantially to the protection of valuable river assets. To be effective, management must be place-based focusing on local watershed scales that are most relevant to management scales. The first priority should be enhancing environmental monitoring of changes and river responses coupled with the development of local scenario-building exercises that take land use and water use into account. Protection of a greater number of rivers and riparian corridors is essential, as is conjunctive groundwater/surface water management. This will require collaborations among multiple partners in the respective river basins and wise land use planning to minimize additional development in watersheds with valued rivers. Ensuring environmental flows by purchasing or leasing water rights and/or altering reservoir release patterns will be needed for many rivers. Implementing restoration projects proactively can be used to protect existing resources so that expensive reactive restoration to repair damage associated with a changing climate is minimized. Special attention should be given to diversifying and replicating habitats of special importance and to monitoring populations at high risk or of special value so that management interventions can occur if the

  19. Evaluation of the Life History of Native Salmonids in the Malheur River Basin; Cooperative Bull Trout/Redband Trout Research Project, 1999-2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schwabe, Lawrence; Tiley, Mark (Burns Paiute Tribe, Department of Fish and Wildlife, Burns, OR); Perkins, Raymond R. (Oregon Department of Fish and Wildlife, Ontario, OR)

    2000-11-01

    The purpose of this study is to document the seasonal distribution of adult/sub-adult bull trout (Salvelinus confluentus) in the Malheur River basin. Due to the decline of bull trout in the Columbia Basin, the United States Fish and Wildlife Service listed bull trout as a threatened species in June 1998. Past land management activities; construction of dams; and fish eradication projects in the North Fork and Middle Fork Malheur River by poisoning have worked in concert to cumulatively impact native species in the Malheur Basin (Bowers et. al. 1993). Survival of the remaining bull trout populations is severely threatened (Buchanan 1997). 1999 Research Objects are: (1) Document the migratory patterns of adult/sub-adult bull trout in the North Fork Malheur River; (2) Determine the seasonal bull trout use of Beulah Reservoir and bull trout entrainment; and (3) Timing and location of bull trout spawning in the North Fork Malheur River basin. The study area includes the Malheur basin from the mouth of the Malheur River located near Ontario, Oregon to the headwaters of the North Fork Malheur River (Map 1). All fish collected and most of the telemetry effort was done on the North Fork Malheur River subbasin (Map 2). Fish collection was conducted on the North Fork Malheur River at the tailwaters of Beulah Reservoir (RK 29), Beulah Reservoir (RK 29-RK 33), and in the North Fork Malheur River at Crane Crossing (RK 69) to the headwaters of the North Fork Malheur. Radio telemetry was done from the mouth of the Malheur River in Ontario, Oregon to the headwaters of the North Fork Malheur. This report will reflect all migration data collected from 3/1/99 to 12/31/99.

  20. Oldman river dam mitigation program downstream vegetation project report, Volume II: The potential effects of an operating plan for the Oldman River dam on Riparian cottonwood forests

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, J.M.

    1993-01-01

    Extensive cottonwood (poplar) forests exist in the Oldman River valley downstream of the Oldman River dam. Studies of similar forests in nearby river valleys and elsewhere on the western prairies have found significant declines of some riparian forests following river damming. This investigation was initiated to determine the causes of cottonwood forest decline downstream from existing dams in southern Alberta; inventory the existing river valley forests in the Oldman Basin; establish study sites in the Oldman River forests to monitor changes in forest status following commissioning of the Oldman River dam, and evaluate the probable impact of proposed operating plans for the Oldman River dam and associated water control structures on downstream forests. This report summarizes the progress made in the analyses of the probable effects on the survival of the forests, including a discussion of the hydrological conditions essential for cottonwood forest regeneration and an explanation of the effects of altering these characteristics on riparian forests; the hydrological alterations expected along various river reaches in the Oldman Basin with the implementation of the proposed OD05 Oldman Dam operating plan; and preliminary analyses of the problem impacts of the OD05 operating plan on the cottonwood forests along these reaches.

  1. Kootenai River Fisheries Investigation : Stock Status of Burbot : Project Progress Report 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Paragamian, Valughn L.; Laude Dorothy C.

    2008-12-26

    Objectives of this investigation were to (1) monitor the population status and recruitment of burbot Lota lota in the Kootenai River, Idaho and British Columbia, Canada during the winter of 2006-2007; (2) evaluate the selective withdrawal system in place at Libby Dam to maintain the river temperature near Bonners Ferry between 1-4 C (November-December) to improve burbot migration and spawning activity; and (3) determine if a hatching success of 10% of eyed burbot embryos could be achieved through extensive rearing and produce fingerlings averaging 9.8 cm in six months. Water temperature did not fall below the upper limit (4 C) until mid-January but was usually maintained between 1-4 C January through February and was acceptable. Snowpack was characterized by a 101% of normal January runoff forecast. Adult burbot were sampled with hoop nets and slat traps. Only three burbot were captured in hoop nets, all at Ambush Rock (rkm 244.5). No burbot were caught in either slat traps or juvenile sampling gear, indicating the population is nearly extirpated. Burbot catch per unit effort in hoop nets was 0.003 fish/net d. Extensive rearing was moved to a smaller private pond and will be reported in the 2008-2009 annual report.

  2. Critical revision of the technical aspects of sanitation of the Bogota river 1994 project

    International Nuclear Information System (INIS)

    Giraldo Eugenio

    1996-01-01

    A moral obligation exists on the part of the human societies of having designed to remove the contamination the environment that has been commended to manage and that it represents the inheritance that guarantees the survival of the species in the earth planet. It exists a growing recognition of this imperious necessity at the present time on the part of all the societies in the world that immediately opens the roads for the political exploitation of so praiseworthy feelings. Paradoxically, the environmentalist feelings don't always redound in a better protection for the nature and the environment, natural or urban. The reparation plan to continue for the Decontamination of the Bogot River; hired by the concession system the first stage of the same one, it is summarized in making three plants of treatment of located residual waters, each one of them in the outlets on the Bogota river of the main basins of drainage of the sanitary sewer system of the city. The treatment plants are of a conventional technology, mud activated that basically are designed to remove 90% of the contamination for organic matter that takes the sanitary sewer system of the respective basin. This level of achieved treatment is denominated in the technical literature as secondary treatment

  3. River Protection Project (RPP) Immobilized Low- Ativity Waste (ILAW) Disposal Plan

    International Nuclear Information System (INIS)

    BRIGGS, M.G.

    2000-01-01

    This document replaces HNF-1517, Rev 2 which is deleted. It incorporates updates to reflect changes in programmatic direction associated with the vitrification plant contract change and associated DOE/ORP guidance. In addition it incorporates the cancellation of Project W-465, Grout Facility, and the associated modifications to Project W-520, Immobilized High-Level Waste Disposal Facility. It also includes document format changes and section number modifications consistent with CH2M HILL Hanford Group, Inc. procedures

  4. Downscaling climate projections for the Peruvian coastal Chancay-Huaral Basin to support river discharge modeling with WEAP

    Directory of Open Access Journals (Sweden)

    Taru Olsson

    2017-10-01

    New hydrological insights for the region: On average, GCMs indicate increased annual mean temperatures by 3.1 °C (RCP4.5 and by 4.3 °C (RCP8.5 and precipitation sum by 20% (RCP4.5 and by 28% (RCP8.5. With increasing total precipitation, river discharges are also found to increase, but the variability among the GCMs is considerable. The largest increases in monthly discharge are projected to occur in the wet season (November − April − with up to 31% increase of December multi-model mean. Despite the larger annual discharge for the mean multi-model result, discharges in the dry season may decrease according to some GCMs, showing the need for an adapted future water management.

  5. Probabilistic evaluation of main coolant pipe break indirectly induced by earthquakes Savannah River Project L and P Reactors

    International Nuclear Information System (INIS)

    Short, S.A.; Wesley, D.A.; Awadalla, N.G.; Kennedy, R.P.

    1989-01-01

    A probabilistic evaluation of seismically-induced indirect pipe break for the Savannah River Project (SRP) L- and P-Reactor main coolant (process water) piping has been conducted. Seismically-induced indirect pipe break can result primarily from: (1) failure of the anchorage of one or more of the components to which the pipe is anchored; or (2) failure of the pipe due to collapse of the structure. the potential for both types of seismically-induced indirect failures was identified during a seismic walkdown of the main coolant piping. This work involved: (1) identifying components or structures whose failure could result in pipe failure; (2) developing seismic capacities or fragilities of these components; (3) combining component fragilities to develop plant damage state fragilities; and (4) convolving the plant seismic fragilities with a probabilistic seismic hazard estimate for the site in order to obtain estimates of seismic risk in terms of annual probability of seismic-induced indirect pipe break

  6. Science partnership between U.S. Geological Survey and the Lower Elwha Klallam Tribe—Understanding the Elwha River Dam Removal Project

    Science.gov (United States)

    Duda, Jeffrey J.; Beirne, Matt M.; Warrick, Jonathan A.; Magirl, Christopher S.

    2018-04-16

    After nearly a century of producing power, two large hydroelectric dams on the Elwha River in Washington State were removed during 2011 to 2014 to restore the river ecosystem and recover imperiled salmon populations. Roughly two-thirds of the 21 million cubic meters of sediment—enough to fill nearly 2 million dump trucks—contained behind the dams was released downstream, which restored natural processes and initiated important changes to the river, estuarine, and marine ecosystems. A multidisciplinary team of scientists from the Lower Elwha Klallam Tribe, academia, non-governmental organizations, Federal and state agencies, and the U.S. Geological Survey collected key data before, during, and after dam removal to understand the outcomes of this historic project on the Elwha River ecosystem.

  7. 75 FR 45695 - Final Federal Agency Actions on Trans-Texas Corridor 35 (TTC-35) in Texas

    Science.gov (United States)

    2010-08-03

    ...-Texas Corridor 35 (TTC-35) in Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... proposed transportation project, TTC-35, extending from the Texas- Oklahoma line to the City of Laredo, generally paralleling existing I- 35 in the State of Texas. DATES: By this notice, the FHWA is advising the...

  8. Captive Rearing Program for Salmon River Chinook Salmon : Project Progress Report, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Venditti, David A.

    2003-10-01

    During 2001, the Idaho Department of Fish and Game continued to develop techniques to rear chinook salmon Oncorhynchus tshawytscha to sexual maturity in captivity and to monitor their reproductive performance under natural conditions. Eyed-eggs were hydraulically collected from redds in the East Fork Salmon River (EFSR; N = 311) and the West Fork Yankee Fork Salmon River (WFYF; N = 272) to establish brood year 2001 culture cohorts. The eyed-eggs were incubated and reared by family group at the Eagle Fish Hatchery (Eagle). Juveniles collected the previous summer were PIT and elastomer tagged and vaccinated against vibrio Vibrio spp. and bacterial kidney disease prior to the majority of them being transferred to the National Marine Fisheries Service, Manchester Marine Experimental Station for saltwater rearing through maturity. Smolt transfers included 210 individuals from the Lemhi River (LEM), 242 from the WFYF, and 178 from the EFSR. Maturing fish transfers from Manchester to Eagle included 62 individuals from the LEM, 72 from the WFYF, and 27 from the EFSR. Additional water chilling capacity was added at Eagle in 2001 to test if spawn timing could be advanced by temperature manipulations, and adults from the LEM and WFYF were divided into chilled ({approx} 9 C) and ambient ({approx} 13.5 C) water temperature groups while at Eagle. Twenty-five mature females from the LEM (11 chilled, 14 ambient) were spawned in captivity with 23 males with the same temperature history in 2001. Water temperature group was not shown to affect the spawn timing of these females, but males did mature earlier. Egg survival to the eyed stage of development averaged 37.9% and did not differ significantly between the two temperature groups. A total of 8,154 eyed-eggs from these crosses were placed in in-stream incubators by personnel from the Shoshone-Bannock Tribe. Mature adults (N = 89) were released into the WFYF to evaluate their reproductive performance. After release, fish

  9. Direct-current resistivity profiling at the Pecos River Ecosystem Project study site near Mentone, Texas, 2006

    Science.gov (United States)

    Teeple, Andrew; McDonald, Alyson K.; Payne, Jason; Kress, Wade H.

    2009-01-01

    The U.S. Geological Survey, in cooperation with Texas A&M University AgriLife, did a surface geophysical investigation at the Pecos River Ecosystem Project study site near Mentone in West Texas intended to determine shallow (to about 14 meters below the water [river] surface) subsurface composition (lithology) in and near treated (eradicated of all saltcedar) and control (untreated) riparian zone sites during June-August 2006. Land-based direct-current resistivity profiling was applied in a 240-meter section of the riverbank at the control site, and waterborne direct-current continuous resistivity profiling (CRP) was applied along a 2.279-kilometer reach of the river adjacent to both sites to collect shallow subsurface resistivity data. Inverse modeling was used to obtain a nonunique estimate of the true subsurface resistivity from apparent resistivity calculated from the field measurements. The land-based survey showed that the sub-surface at the control site generally is of relatively low resis-tivity down to about 4 meters below the water surface. Most of the section from about 4 to 10 meters below the water surface is of relatively high resistivity. The waterborne CRP surveys convey essentially the same electrical representation of the lithology at the control site to 10 meters below the water surface; but the CRP surveys show considerably lower resistivity than the land-based survey in the subsection from about 4 to 10 meters below the water surface. The CRP surveys along the 2.279-kilometer reach of the river adjacent to both the treated and control sites show the same relatively low resistivity zone from the riverbed to about 4 meters below the water surface evident at the control site. A slightly higher resistivity zone is observed from about 4 to 14 meters below the water surface along the upstream approximately one-half of the profile than along the downstream one-half. The variations in resistivity could not be matched to variations in lithology because

  10. Strategy for the Identification of an INL Comprehensive Utility Corridor

    Energy Technology Data Exchange (ETDEWEB)

    John Reisenauer

    2011-05-01

    This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot

  11. Palaeohydrological corridors for hominin dispersals in the Middle East ∼250-70,000 years ago

    Science.gov (United States)

    Breeze, Paul S.; Groucutt, Huw S.; Drake, Nick A.; White, Tom S.; Jennings, Richard P.; Petraglia, Michael D.

    2016-07-01

    The timing and extent of palaeoenvironmental connections between northeast Africa, the Levant and the Arabian Peninsula during the Middle and Late Pleistocene are critical to debates surrounding dispersals of hominins, including movements of Homo sapiens out of Africa. Although there is evidence that synchronous episodes of climatic amelioration during the late Middle and Late Pleistocene may have allowed connections to form between northern Africa and western Asia, a number of palaeoclimate models indicate the continued existence of an arid barrier between northern Arabia and the Levant. Here we evaluate the palaeoenvironmental setting for hominin dispersals between, and within, northeast Africa and southwest Asia during Marine Isotope Stages (MIS) 7-5 using reconstructions of surface freshwater availability as an environmental proxy. We use remotely sensed data to map palaeohydrological features (lakes, wetlands and rivers) across the presently hyper-arid areas of northern Arabia and surrounding regions, integrating these results with palaeoclimate models, palaeoenvironmental proxy data and absolute dating to determine when these features were active. Our analyses suggest limited potential for dispersals during MIS 7 and 6, but indicate the formation of a palaeohydrological corridor (the 'Tabuk Corridor') between the Levant and the Arabian interior during the MIS 6-5e glacial-interglacial transition and during MIS 5e. A recurrence of this corridor, following a slightly different route, also occurred during MIS 5a. These palaeohydrological and terrestrial data can be used to establish when proposed routes for hominin dispersals became viable. Furthermore, the distribution of Arabian archaeological sites with affinities to Levantine assemblages, some of which are associated with Homo sapiens fossils, and the relative density of Middle Palaeolithic assemblages within the Tabuk Corridor, are consistent with it being utilised for dispersals at various times.

  12. Optimal location of dry ports in the Pan-Pearl River Delta

    Directory of Open Access Journals (Sweden)

    Wu Qitao

    2017-01-01

    Full Text Available Dry ports have become a very important part of globalization and a cornerstone in port competitiveness. Based on the analytic hierarchy process, this paper established the dry port index system to evaluate the potential location of dry ports linked to the port system in the Pearl River Delta, in a case study covering 115 cities in the Pan - Pearl River Delta. The results show that it is optimal to locate 21 dry ports in the research region, and each dry port serves different areas. There are 4 optimal transport corridors for the dry port logistic network, including Guangzhou- Kunming transport corridor, Guangzhou-Chengdu transport corridor, Guangzhou-Changsha transport corridor and Shenzhen-Nanchang transport corridor.

  13. Design and construction of the defense waste processing facility project at the Savannah River Plant

    International Nuclear Information System (INIS)

    Baxter, R.G.

    1986-01-01

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level radioactive waste at the Savannah River Plant (SRP) near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes by immobilizing the waste in Processing Facility (DWPF) will solidify existing and future radioactives wastes by immobilizing the waste in borosilicate glass contained in stainless steel canisters. The canisters will be sealed, decontaminated and stored, prior to emplacement in a federal repository. At the present time, engineering and design is 90% complete, construction is 25% complete, and radioactive processing in the $870 million facility is expected to begin by late 1989. This paper describes the SRP waste characteristics, the DWPF processing, building and equipment features, and construction progress of the facility

  14. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  15. Chlorine demand and residual chlorine decay kinetics of Kali river water at Kaiga project area

    International Nuclear Information System (INIS)

    Krishna Bhat, D.; Prakash, T.R.; Thimme Gowda, B.; Sherigara, B.S.; Khader, A.M.A.

    1995-01-01

    The nuclear power plant at Kaiga would use Kali river water for condenser cooling. This necessitated studies on the chemistry of chlorination such as chlorine demand, kinetics of chlorination and other water characteristics aimed at obtaining base line data. The study revealed significant seasonal variation of chlorine demand ranging from 0.5 ppm to 1.7 ppm (3.0 ppm dose, 30 min contact time) and total consumption of 5.0 ppm (10.0 ppm dose, 48 hours contact time). The reaction follows first order kinetics in chlorine. High correlation of chlorine demand with chlorophyll a, suspended matter, turbidity, silica, nitrite, phosphate and sulphate indicated that chlorine demand is greatly influenced by water quality. (author). 3 refs., 1 tab

  16. Water Resources Data. Ohio - Water Year 1992. Volume 1. Ohio River Basin excluding project data

    Energy Technology Data Exchange (ETDEWEB)

    H.L. Shindel; J.H. Klingler; J.P. Mangus; L.E. Trimble

    1993-03-01

    Water-resources data for the 1992 water year for Ohio consist of records of stage, discharge, and water quality of streams; stage and contents of lakes and reservoirs; and water levels and water quality of ground-water wells. This report, in two volumes, contains records for water discharge at 121 gaging stations, 336 wells, and 72 partial-record sites; and water levels at 312 observation wells. Also included are data from miscellaneous sites. Additional water data were collected at various sites not involved in the systematic data-collection program and are published as miscellaneous measurements and analyses. These data represent that part of the National Water Data System collected by the US Geological Survey and cooperating State and Federal agencies in Ohio. Volume 1 covers the central and southern parts of Ohio, emphasizing the Ohio River Basin. (See Order Number DE95010451 for Volume 2 covering the northern part of Ohio.)

  17. U.S. Geological Survey and Bureau of Land Management Cooperative Coalbed Methane Project in the Powder River Basin, Wyoming

    Science.gov (United States)

    ,

    2006-01-01

    Introduction: Evidence that earthquakes threaten the Mississippi, Ohio, and Wabash River valleys of the Central United States abounds. In fact, several of the largest historical earthquakes to strike the continental United States occurred in the winter of 1811-1812 along the New Madrid seismic zone, which stretches from just west of Memphis, Tenn., into southern Illinois (fig. 1). Several times in the past century, moderate earthquakes have been widely felt in the Wabash Valley seismic zone along the southern border of Illinois and Indiana (fig. 1). Throughout the region, between 150 and 200 earthquakes are recorded annually by a network of monitoring instruments, although most are too small to be felt by people. Geologic evidence for prehistoric earthquakes throughout the region has been mounting since the late 1970s. But how significant is the threat? How likely are large earthquakes and, more importantly, what is the chance that the shaking they cause will be damaging?The Bureau of Land Management (BLM) Wyoming Reservoir Management Group and the U.S. Geological Survey (USGS) began a cooperative project in 1999 to collect technical and analytical data on coalbed methane (CBM) resources and quality of the water produced from coalbeds in the Wyoming part of the Powder River Basin. The agencies have complementary but divergent goals and these kinds of data are essential to accomplish their respective resource evaluation and management tasks. The project also addresses the general public need for information pertaining to Powder River Basin CBM resources and development. BLM needs, which relate primarily to the management of CBM resources, include improved gas content and gas in-place estimates for reservoir characterization and resource/reserve assessment, evaluation, and utilization. USGS goals include a basinwide assessment of CBM resources, an improved understanding of the nature and origin of coalbed gases and formation waters, and the development of predictive

  18. Changes in the world rivers' discharge projected from an updated high resolution dataset of current and future climate zones

    Science.gov (United States)

    Santini, Monia; di Paola, Arianna

    2015-12-01

    In this paper, an updated global map of the current climate zoning and of its projections, according to the Köppen-Geiger classification, is first provided. The map at high horizontal resolution (0.5° × 0.5°), representative of the current (i.e. 1961-2005) conditions, is based on the Climate Research Unit dataset holding gridded series of historical observed temperature and precipitation, while projected conditions rely on the simulated series, for the same variables, by the General Circulation Model CMCC-CM. Modeled variables were corrected for their bias and then projections of climate zoning were generated for the medium term (2006-2050) and long term (2056-2100) future periods, under RCP 4.5 and RCP 8.5 emission scenarios. Results show that Equatorial and Arid climates will spread at the expenses of Snow and Polar climates, with the Warm Temperate experiencing more moderate increase. Maps of climate zones are valuable for a wide range of studies on climate change and its impacts, especially those regarding the water cycle that is strongly regulated by the combined conditions of precipitation and temperature. As example of large scale hydrological applications, in this work we tested and implemented a spatial statistical procedure, the geographically weighted regression among climate zones' surface and mean annual discharge (MAD) at hydrographic basin level, to quantify likely changes in MAD for the main world rivers monitored through the Global Runoff Data Center database. The selected river basins are representative of more than half of both global superficial freshwater resources and world's land area. Globally, a decrease in MAD is projected both in the medium term and long term, while spatial differences highlight how some areas require efforts to avoid consequences of amplified water scarcity, while other areas call for strategies to take the opportunity from the expected increase in water availability. Also the fluctuations of trends between the

  19. Effects of vegetation, corridor width and regional land use on early successional birds on powerline corridors.

    Directory of Open Access Journals (Sweden)

    Robert A Askins

    Full Text Available Powerline rights-of-way (ROWs often provide habitat for early successional bird species that have suffered long-term population declines in eastern North America. To determine how the abundance of shrubland birds varies with habitat within ROW corridors and with land use patterns surrounding corridors, we ran Poisson regression models on data from 93 plots on ROWs and compared regression coefficients. We also determined nest success rates on a 1-km stretch of ROW. Seven species of shrubland birds were common in powerline corridors. However, the nest success rates for prairie warbler (Dendroica discolor and field sparrow (Spizella pusilla were <21%, which is too low to compensate for estimated annual mortality. Some shrubland bird species were more abundant on narrower ROWs or at sites with lower vegetation or particular types of vegetation, indicating that vegetation management could be refined to favor species of high conservation priority. Also, several species were more abundant in ROWs traversing unfragmented forest than those near residential areas or farmland, indicating that corridors in heavily forested regions may provide better habitat for these species. In the area where we monitored nests, brood parasitism by brown-headed cowbirds (Molothrus ater occurred more frequently close to a residential area. Although ROWs support dense populations of shrubland birds, those in more heavily developed landscapes may constitute sink habitat. ROWs in extensive forests may contribute more to sustaining populations of early successional birds, and thus may be the best targets for habitat management.

  20. Digital geospatial presentation of geoelectrical and geotechnical data for the lower American River and flood plain, east Sacramento, California

    Science.gov (United States)

    Ball, Lyndsay B.; Burton, Bethany L.; Powers, Michael H.; Asch, Theodore H.

    2015-01-01

    To characterize the extent and thickness of lithologic units that may have differing scour potential, the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, has performed several geoelectrical surveys of the lower American River channel and flood plain between Cal Expo and the Rio Americano High School in east Sacramento, California. Additional geotechnical data have been collected by the U.S. Army Corps of Engineers and its contractors. Data resulting from these surveys have been compiled into similar database formats and converted to uniform geospatial datums and projections. These data have been visualized in a digital three-dimensional framework project that can be viewed using freely available software. These data facilitate a comprehensive analysis of the resistivity structure underlying the lower American River corridor and assist in levee system management.