WorldWideScience

Sample records for river company final

  1. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Crew, James F. [Southern Company Generation, Birmingham, AL (United States). Hydro Services; Johnson, Herbie N. [Southern Company Generation, Birmingham, AL (United States). Hydro Services

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  2. Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company

    International Nuclear Information System (INIS)

    Paller, M.

    1992-01-01

    Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor's heat exchangers where temperatures may reach 70 degrees C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams ampersand Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS

  3. Westinghouse Savannah River Company (WSRC) approach to nuclear facility maintenance

    International Nuclear Information System (INIS)

    Harrison, D.W.

    1991-01-01

    The Savannah River Site (SRS) in South Carolina is a 300+ square mile facility owned by the US Department of Energy (DOE) and operated by Westinghouse Savannah River Company (WSRC), the prime contractor; Bechtel Savannah River, Incorporated (BSRI) is a major subcontractor. The site has used all of the five nuclear reactors and it has the necessary nuclear materials processing facilities, as well as waste management and research facilities. The site has produced materials for the US nuclear arsenal and various isotopes for use in space research and nuclear medicine for more than 30 years. In 1989, WSRC took over as prime contractor, replacing E.I. du Pont de Nemours and Company. At this time, a concentrated effort began to more closely align the operating standards of this site with those accepted by the commercial nuclear industry of the United States. Generally, this meant acceptance of standards of the Institute of Nuclear Power Operations (INPO) for nuclear-related facilities at the site. The subject of this paper is maintenance of nuclear facilities and, therefore, excludes discussion of the maintenance of non-nuclear facilities and equipment

  4. 78 FR 14531 - French River Land Company, Northwoods Renewables LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5638-002] French River Land Company, Northwoods Renewables LLC; Notice of Transfer of Exemption 1. By letter filed February 21, 2013, French River Land Company and Northwoods Renewables LLC informed the Commission that the exemption from...

  5. Rapid River Hatchery - Spring Chinook, Final Report

    International Nuclear Information System (INIS)

    Watson, M.

    1996-05-01

    This report presents the findings of the independent audit of the Rapid River Hatchery (Spring Chinook). The hatchery is located in the lower Snake River basin near Riggins Idaho. The hatchery is used for adult collection, egg incubation, and rearing of spring chinook. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the US Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife

  6. Listening to the River: Final Evaluation Report

    Science.gov (United States)

    Robles, Dawn; Mitchell, Heather; Horsch, Elizabeth; St. John, Mark

    2010-01-01

    "Listening to the River" (LTTR) is a watershed science education project funded by the National Science Foundation. The project aims to deliver watershed education experiences in and around Traverse City, Michigan, and also to develop a model that can be replicated in other locations. Inverness Research was contracted by the…

  7. 77 FR 24483 - Kern River Gas Transmission Company; Notice of Filing

    Science.gov (United States)

    2012-04-24

    ... funds used during construction (AFUDC) capitalized as a component of the construction costs of its Apex Expansion project (Apex), by recording AFUDC on the Apex project as though it was compounded monthly during... Transmission Company; Notice of Filing Take notice that on March 29, 2012, Kern River Gas Transmission Company...

  8. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  9. Congeneration feasibility: Otis Elevator Company and Polychrome Corporation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Fox, H.

    1982-05-01

    This report summarizes an investigation of the technical and economic feasibility of cogenerating electric and thermal power at two manufacturing plants (Otis Elevator Company and Polychrome Corporation) located on neighboring properties in Yonkers, NY. Existing electrical- and steam-producing equipment and energy consumption date are summarized. Alternative cases examined include electrical energy generation, electrical energy generation with waste heat recovery and a combined cycle case. Also reported are life cycle cost economic evaluations including simple payback period and return-on-investment indices. While it was concluded that cogeneration of heat and electricity at these industrial plant sites would not be economically viable, this detailed study provides valuable insight into the types of problems encountered when considering cogeneration feasibility.

  10. Management of data banks at Westinghouse Savannah River Company

    International Nuclear Information System (INIS)

    Baughman, D.F.

    1992-01-01

    The Risk Assessment Methodology Group (RAM) of the Nuclear Processes Safety Research Section (NPSR) maintains the compilation of incidents that have occurred at the Savannah River Site. The data banks have gained national recognition for their value in risk-related studies. The information provided by these data banks is widely used at SRS and across the DOE Complex. This report discusses these data banks

  11. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions, Recommendations, and Prescriptions May 26, 2010. Take notice that the following hydroelectric application and applicant-prepared..., 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...

  12. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings

  13. Cogeneration feasibility: Otis Elevator Company and Polychrome Corporation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The purpose of this study was to assess the feasibility of cogeneration at Otis Elevator Company and Polychrome Corporation located in Westchester County, New York. Each plant and its associated thermal and electrical load is reviewed. Three basic cycles for the cogeneration are investigated: power only, power generation with waste heat recovery, and combined cycle. Each case was assessed economically, beginning with a screening method to suggest those configurations most likely to be implemented and continuing through an assessment of the regulatory environment for cogeneration and an analysis of rate structures for buy back power, displaced power, and supplementing service. It is concluded that: for a plant designed to supply the combined loads of the two corporations, interconnection costs coupled to the coincidence of load result in unfavorable economics; for separate cogeneration plants, owned and operated by each individual corporation, energy consumption patterns and the current regulatory environment, in particular the existing and proposed cogeneration system rate structures, do not permit viable economics for the proposed plants; but if the proposed cycle were owned and operated by a new entity (neither Otis/Polychrome nor the utility), an economic scheme with marginal financial benefits can be developed and may be worthy of further study. (LEW)

  14. 77 FR 56241 - Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000

    Science.gov (United States)

    2012-09-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0131] Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000 By letter dated December 10, 2010, Westinghouse Electric... final design approval (FDA) for the Advanced Passive 1000 (AP1000) design upon the completion of...

  15. Alligator Rivers Analogue Project. Final Report - Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Duerden, P [Australian Nuclear Science and Technology Organisation (ANSTO), Lucas Heights, NSW (Australia); Lever, D A [AEA Technology, Harwell (United Kingdom); Sverjensky, D A [Johns Hopkins Univ., Baltimore, MD (United States); Townley, L R [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Wembley, WA (Australia). Div. of Water Resources

    1992-07-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  16. Alligator Rivers Analogue Project. Final Report - Volume 1

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  17. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental Assessment In accordance with... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  18. 77 FR 26537 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2012-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment In accordance with the... the proposed 14,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch...

  19. 13 CFR 108.380 - Final approval as a NMVC Company.

    Science.gov (United States)

    2010-01-01

    ... VENTURE CAPITAL (âNMVCâ) PROGRAM Evaluation and Selection of NMVC Companies § 108.380 Final approval as a... amount of Regulatory Capital set forth in its application, pursuant to § 108.310(a)(1); and (B) The... at least 30 percent of its Regulatory Capital if the Conditionally Approved NMVC Company— (i) Already...

  20. 76 FR 52997 - Public Company Accounting Oversight Board; Order Approving Proposed Board Funding Final Rules for...

    Science.gov (United States)

    2011-08-24

    ... Accounting Oversight Board; Order Approving Proposed Board Funding Final Rules for Allocation of the Board's... August 18, 2011. I. Introduction On June 21, 2011, the Public Company Accounting Oversight Board (the... public accounting firm, in amounts that are sufficient to cover the costs of processing and reviewing...

  1. Red River Stream Improvement Final Design Nez Perce National Forest.

    Energy Technology Data Exchange (ETDEWEB)

    Watershed Consulting, LLC

    2007-03-15

    This report details the final stream improvement design along the reach of Red River between the bridge below Dawson Creek, upstream for approximately 2 miles, Idaho County, Idaho. Geomorphic mapping, hydrologic profiles and cross-sections were presented along with existing fish habitat maps in the conceptual design report. This information is used to develop a stream improvement design intended to improve aquatic habitat and restore riparian health in the reach. The area was placer mined using large bucket dredges between 1938 and 1957. This activity removed most of the riparian vegetation in the stream corridor and obliterated the channel bed and banks. The reach was also cut-off from most valley margin tributaries. In the 50 years since large-scale dredging ceased, the channel has been re-established and parts of the riparian zone have grown in. However, the recruitment of large woody debris to the stream has been extremely low and overhead cover is poor. Pool habitat makes up more than 37% of the reach, and habitat diversity is much better than the project reach on Crooked River. There is little large woody debris in the stream to provide cover for spawning and juvenile rearing, because the majority of the woody debris does not span a significant part of the channel, but is mainly on the side slopes of the stream. Most of the riparian zone has very little soil or subsoil left after the mining and so now consists primarily of unconsolidated cobble tailings or heavily compacted gravel tailings. Knapweed and lodgepole pine are the most successful colonizers of these post mining landforms. Tributary fans which add complexity to many other streams in the region, have been isolated from the main reach due to placer mining and road building.

  2. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  3. Flathead River creel report, 1992--1993. Final report

    International Nuclear Information System (INIS)

    Hanzel, D.

    1995-09-01

    A roving creel survey was conducted on the Flathead River system, May 1992 through May 1993, as part of Hungry Horse Dam Fisheries Mitigation, funded by Bonneville Power Administration. The Flathead River system is a tributary to the Clarks Fork of the Columbia River originating in northwest Montana and southern British Columbia. The river creel survey was conducted in conjunction with a Flathead Lake creel survey. This document summarizes the creel survey on the river system. The purpose of these creel surveys was to quantify fishery status prior to mitigation efforts and provide replicative survey methodology to measure success of future mitigation activities. 4 figs., 21 tabs

  4. Morphodynamics of the Final 500 Kilometers of the Mississippi River

    Science.gov (United States)

    Wang, B.; Xu, Y. J.

    2017-12-01

    Channel dynamics of alluvial rivers in their lower reaches can strongly influence deltaic development. In this study, we analyzed over 6,000 single-beam cross-sectional measurements surveyed in 1992, 2004, and 2013 in the last 500-km reach of the highly engineered Mississippi River, a.k.a. the lowermost Mississippi River (LmMR), starting from the river's Gulf outlet to its avulsion into the Atchafalaya River. We applied Inverse Distance Weighted interpolation to downscale the survey records into 10 x 10 m Digital Elevation Models. We assessed riverbed deformation from bank to bank and quantified georeferenced changes in riverbed sediment volume and mass. We intended to test the hypothesis that the lower reach of a large alluvial river can function as a conduit for sediment transport under the current engineering focus of navigation safety and flood control. Our analysis shows that in the past two decades, nearly 70% of the riverine sand is trapped within the LmMR, and that continuous riverbed aggradation occurred below the Mississippi-Atchafalaya diversion, presenting favorable backwater conditions for avulsion. Backwater effects have mainly controlled riverbed deformation in the LmMR, while flow reduction may have also contributed to channel aggradation in the uppermost and lowermost reaches. The study reveals the considerable complexity of geomorphic responses of a large alluvial river to human interventions, strongly suggesting that future river engineering and management need also to focus on strategies that will improve sediment transport to the downstream river delta.

  5. Hood River Production Program Review, Final Report 1991-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Underwood, Keith; Chapman, Colin; Ackerman, Nicklaus

    2003-12-01

    This document provides a comprehensive review of Bonneville Power Administration (BPA) funded activities within the Hood River Basin from 1991 to 2001. These activities, known as the Hood River Production Program (HRPP), are intended to mitigate for fish losses related to operation of federal dams in the Columbia River Basin, and to contribute to recovery of endangered and/or threatened salmon and steelhead, as directed by Nation Oceanic and Atmospheric Administration - Fisheries (NOAA Fisheries). The Environmental Impact Statement (EIS) for the HRPP, which authorized BPA to fund salmon and steelhead enhancement activities in the Hood River Basin, was completed in 1996 (BPA 1996). The EIS specified seven years of monitoring and evaluation (1996-2002) after program implementation to determine if program actions needed modification to meet program objectives. The EIS also called for a program review after 2002, that review is reported here.

  6. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930's, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D'Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation

  7. Columbia River final environmental impact statement. Appendix B: Air quality

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix consists of eight chapters. Chapter 1 describes the air quality issues that were raised in the SOR scoping process and provides an overview of the study process used to evaluate air quality effects from various system operation alternatives. Chapter 2 describes the Federal, state, and local programs that regulate air quality and discusses the air quality standards that are relevant to the analysis. It also gives an overview of the limatology of the region and the existing air quality in the Columbia River Basin, including areas of non-attainment for relevant air quality standards. Chapter 3 presents the methods this study uses for the analysis of air quality and for the evaluation of human health effects from air pollutants. Chapter 4 provides the study results for the System Operating Strategy (SOS) alternatives and potential mitigation measures. Chapter 5 compares impacts on air quality and human health across alternatives, and discusses mitigation measures and cumulative effects. Chapters 6, 7, and 8 contain the list of preparers, glossary, and references, respectively. Technical exhibits supporting the analysis are also included

  8. Columbia River system operation review. Final environmental impact statement. Appendix J, recreation

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts

  9. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  10. 76 FR 10350 - Kern River Gas Transmission Company; Notice of Intent To Prepare an Environmental Assessment for...

    Science.gov (United States)

    2011-02-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-46-000] Kern River Gas Transmission Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Mountain Pass Lateral Project, Request for Comments on Environmental Issues and Notice of Onsite Environmental Review The staff of the Federal Energy...

  11. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  12. Grays River Watershed and Biological Assessment Final Report 2006.

    Energy Technology Data Exchange (ETDEWEB)

    May, Christopher W.; McGrath, Kathleen E.; Geist, David R. [Pacific Northwest National Laboratory; Abbe, Timothy; Barton, Chase [Herrera Environmental Consultants, Inc.

    2008-02-04

    The Grays River Watershed and Biological Assessment was funded to address degradation and loss of spawning habitat for chum salmon (Onchorhynchus keta) and fall Chinook salmon (Onchoryhnchus tshawytscha). In 1999, the National Marine Fisheries Service listed lower Columbia River chum salmon as a threatened Evolutionarily Significant Unit (ESU) under the Endangered Species Act of 1973 (ESA). The Grays River watershed is one of two remaining significant chum salmon spawning locations in this ESU. Runs of Grays River chum and Chinook salmon have declined significantly during the past century, largely because of damage to spawning habitat associated with timber harvest and agriculture in the watershed. In addition, approximately 20-25% of the then-remaining chum salmon spawning habitat was lost during a 1999 channel avulsion that destroyed an important artificial spawning channel operated by the Washington Department of Fish and Wildlife (WDFW). Although the lack of stable, high-quality spawning habitat is considered the primary physical limitation on Grays River chum salmon production today, few data are available to guide watershed management and channel restoration activities. The objectives of the Grays River Watershed and Biological Assessment project were to (1) perform a comprehensive watershed and biological analysis, including hydrologic, geomorphic, and ecological assessments; (2) develop a prioritized list of actions that protect and restore critical chum and Chinook salmon spawning habitat in the Grays River based on comprehensive geomorphic, hydrologic, and stream channel assessments; and (3) gain a better understanding of chum and Chinook salmon habitat requirements and survival within the lower Columbia River and the Grays River. The watershed-based approach to river ecosystem restoration relies on a conceptual framework that describes general relationships between natural landscape characteristics, watershed-scale habitat-forming processes, aquatic

  13. Grays River Watershed and Biological Assessment, 2006 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    May, Christopher; Geist, David [Pacific Northwest National Laboratory

    2007-04-01

    The Grays River Watershed and Biological Assessment was funded to address degradation and loss of spawning habitat for chum salmon (Onchorhynchus keta) and fall Chinook salmon (Onchoryhnchus tshawytscha). In 1999, the National Marine Fisheries Service listed lower Columbia River chum salmon as a threatened Evolutionarily Significant Unit (ESU) under the Endangered Species Act of 1973 (ESA). The Grays River watershed is one of two remaining significant chum salmon spawning locations in this ESU. Runs of Grays River chum and Chinook salmon have declined significantly during the past century, largely because of damage to spawning habitat associated with timber harvest and agriculture in the watershed. In addition, approximately 20-25% of the then-remaining chum salmon spawning habitat was lost during a 1999 channel avulsion that destroyed an important artificial spawning channel operated by the Washington Department of Fish and Wildlife (WDFW). Although the lack of stable, high-quality spawning habitat is considered the primary physical limitation on Grays River chum salmon production today, few data are available to guide watershed management and channel restoration activities. The objectives of the Grays River Watershed and Biological Assessment project were to (1) perform a comprehensive watershed and biological analysis, including hydrologic, geomorphic, and ecological assessments; (2) develop a prioritized list of actions that protect and restore critical chum and Chinook salmon spawning habitat in the Grays River based on comprehensive geomorphic, hydrologic, and stream channel assessments; and (3) gain a better understanding of chum and Chinook salmon habitat requirements and survival within the lower Columbia River and the Grays River. The watershed-based approach to river ecosystem restoration relies on a conceptual framework that describes general relationships between natural landscape characteristics, watershed-scale habitat-forming processes, aquatic

  14. Yakima River Spring Chinook Enhancement Study, 1991 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fast, David E.

    1991-05-01

    The population of Yakima River spring chinook salmon (Oncorhynchus tschawytscha) has been drastically reduced from historic levels reported to be as high as 250,000 adults (Smoker 1956). This reduction is the result of a series of problems including mainstem Columbia dams, dams within the Yakima itself, severely reduced flows due to irrigation diversions, outmigrant loss in irrigation canals, increased thermal and sediment loading, and overfishing. Despite these problems, the return of spring chinook to the Yakima River has continued at levels ranging from 854 to 9,442 adults since 1958. In October 1982, the Bonneville Power Administration contracted the Yakima Indian Nation to develop methods to increase production of spring chinook in the Yakima system. The Yakima Nation's current enhancement policy attempts to maintain the genetic integrity of the spring chinook stock native to the Yakima Basin. Relatively small numbers of hatchery fish have been released into the basin in past years. The goal of this study was to develop data that will be used to present management alternatives for Yakima River spring chinook. A major objective of this study is to determine the distribution, abundance and survival of wild Yakima River spring chinook. The second major objective of this study is to determine the relative effectiveness of different methods of hatchery supplementation. The last three major objectives of the study are to locate and define areas in the watershed that may be used for the rearing of spring chinook; to define strategies for enhancing natural production of spring chinook in the Yakima River; and to determine the physical and biological limitations on production within the system. 47 refs., 89 figs., 67 tabs.

  15. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    Since the 1930's, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M ampersand I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M ampersand I studies; Irrigation/M ampersand I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M ampersand I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement

  16. Columbia River System Operation Review final environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System Operation Review (SOR) is being conducted jointly by the US Army Corps of Engineers, the Bureau of Reclamation, and the Bonneville Power Administration. This summary of the SOR story begins where the Draft EIS summary left off. It is divided into seven parts, each of which reports some aspect of the study's outcome: Part 1 is a history. The SOR was not a simple study on any level, and to understand the EIS alternatives, some background is necessary. Part 2 reports the major findings of the technical analysis of alternative system operating strategies, and presents the agencies' Preferred Alternative. Part 3 explains actions the agencies may take with respect to the Columbia River Regional Forum, the Pacific Northwest Coordination Agreement, and the Canadian Entitlement Allocation Agreements. Part 4 presents the Purpose and Need, elements at the core of any Federal EIS. It includes a map showing the Columbia River Basin and information on the affected Federal projects. Part 5 describes the substantial public participation and outreach that occurred during the SOR, and Part 6 summarizes efforts to incorporate the Tribal perspective into the study. Part 7 describes other activities that will be taking place in the next few years, which are related to and build upon the SOR

  17. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  18. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  19. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix O: Economic and Social Impact.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included.

  20. Columbia River system operation review: Final environmental impact statement. Appendix O, economic and social impact

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included

  1. Los Alamos MAWST software layered on Westinghouse Savannah River Company's nuclear materials accountability system

    International Nuclear Information System (INIS)

    Whitty, W.J.; Smith, J.E.; Davis, J.M. Jr.

    1995-01-01

    The Los Alamos Safeguards Systems Group's Materials Accounting With Sequential Testing (MAWST) computer program was developed to fulfill DOE Order 5633.3B requiring that inventory-difference control limits be based on variance propagation or any other statistically valid technique. Westinghouse Savannah River Company (WSRC) developed a generic computerized accountability system, NucMAS, to satisfy accounting and reporting requirements for material balance areas. NucMAS maintains the calculation methods and the measurement information required to compute nuclear material transactions in elemental and isotopic masses by material type code. The Safeguards Systems Group designed and implemented to WSRC's specifications a software interface application, called NucMASloe. It is a layered product for NucMAS that automatically formats a NucMAS data set to a format compatible with MAWST and runs MAWST. This paper traces the development of NucMASloe from the Software Requirements through the testing and demonstration stages. The general design constraints are described as well as the difficulties encountered on interfacing an external software product (MAWST) with an existing classical accounting structure (NucMAS). The lessons learned from this effort, the design, and some of the software are directly applicable to the Local Area Network Material Accountability System (LANMAS) being sponsored by DOE

  2. Savannah River Site waste management. Final environmental impact statement - addendum

    International Nuclear Information System (INIS)

    1995-07-01

    The purpose of this environmental impact statement is to help DOE decide how to manage over the next 30 years liquid high-level radioactive, low-level radioactive, mixed, hazardous, and transuranic wastes generated during 40 years of past operations and on-going activities (including management of wastes received from offsite) at Savannah River Site (SRS) in southwestern South Carolina. The wastes are currently stored at SRS. DOE seeks to dispose of the wastes in a cost-effective manner that protects human health and the environment. In this document, DOE assesses the cumulative environmental impacts of storing, treating, and disposing of the wastes, examines the impacts of alternatives, and identifies measures available to reduce adverse impacts. Evaluations of impacts on water quality, air quality, ecological systems, land use, geologic resources, cultural resources, socio-economics, and the health and safety of onsite workers and the public are included in the assessment

  3. Savannah River Site Waste Management Final Environmental Impact Statement Addendum

    International Nuclear Information System (INIS)

    1995-07-01

    The purpose of this environmental impact statement is to help DOE decide how to manage over the next 30 years liquid high-level radioactive, low-level radioactive, mixed, hazardous, and transuranic wastes generated during 40 years of past operations and on-going activities (including management of wastes received from offsite) at Savannah River Site (SRS) in southwestern South Carolina. The wastes are currently stored at SRS. DOE seeks to dispose of the wastes in a cost-effective manner that protects human health and the environment. In this document, DOE assesses the cumulative environmental impacts of storing, treating, and disposing of the wastes, examines the impacts of alternatives, and identifies measures available to reduce adverse impacts. Evaluations of impacts on water quality, air quality, ecological systems, land use, geologic resources, cultural resources, socio-economic, and the health and safety of onsite workers and the public are included in the assessment

  4. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  5. Alligator Rivers Analogue project. Hydrogeological modelling. Final Report - Volume 6

    International Nuclear Information System (INIS)

    Townley, L.R.; Trefry, M.G.; Barr, A.D.; Braumiller, S.

    1992-01-01

    This volume describes hydrogeological modelling carried out as part of the Alligator Rivers Analogue Project. Hydrogeology has played a key integrating role in the Project, largely because water movement is believed to have controlled the evolution of the Koongarra uranium Orebody and therefore affects field observations of all types at all scales. Aquifer testing described uses the concept of transmissivity in its interpretation of aquifer response to pumping. The concept of an aquifer, a layer transmitting significant quantities of water in a mainly horizontal direction, seems hard to accept in an environment as heterogeneous as that at Koongarra. But modelling of aquifers both in one dimension and two dimensionally in plan has contributed significantly to our understanding of the site. A one-dimensional model with three layers (often described as a quasi two dimensional model) was applied to flow between the Fault and Koongarra Creek. Being a transient model, this model was able to show that reverse flows can indeed occur back towards the Fault, but only if there is distributed recharge over the orebody as well as a mechanism for the Fault, or a region near the Fault, to remove water from the simulated cross-section. The model also showed clearly that the response of the three-layered system, consisting of a highly weathered zone, a fractured transmissive zone and a less conductive lower schist zone, is governed mainly by the transmissivity and storage coefficient of the middle layer. The storage coefficient of the higher layer has little effect. A two-dimensional model in plan used a description of anisotropy to show that reverse flows can also occur even without a conducting Fault. Modelling of a three-dimensional region using discrete fractures showed that it is certainly possible to simulate systems like that observed at Koongarra, but that large amounts of data are probably needed to obtain realistic descriptions of the fracture networks. Inverse modelling

  6. Alligator Rivers Analogue project. Hydrogeological modelling. Final Report - Volume 6

    Energy Technology Data Exchange (ETDEWEB)

    Townley, L R; Trefry, M G; Barr, A D [CSIRO Div of Water Resources, PO Wembley, WA (Australia); Braumiller, S [Univ of Arizona, Tucson, AZ (United States). Dept of Hydrology and Water Resources; Kawanishi, M [Central Research Institute of Electric Power Industry, Abiko-Shi, Chiba-Ken (Japan); and others

    1993-12-31

    This volume describes hydrogeological modelling carried out as part of the Alligator Rivers Analogue Project. Hydrogeology has played a key integrating role in the Project, largely because water movement is believed to have controlled the evolution of the Koongarra uranium Orebody and therefore affects field observations of all types at all scales. Aquifer testing described uses the concept of transmissivity in its interpretation of aquifer response to pumping. The concept of an aquifer, a layer transmitting significant quantities of water in a mainly horizontal direction, seems hard to accept in an environment as heterogeneous as that at Koongarra. But modelling of aquifers both in one dimension and two dimensionally in plan has contributed significantly to our understanding of the site. A one-dimensional model with three layers (often described as a quasi two dimensional model) was applied to flow between the Fault and Koongarra Creek. Being a transient model, this model was able to show that reverse flows can indeed occur back towards the Fault, but only if there is distributed recharge over the orebody as well as a mechanism for the Fault, or a region near the Fault, to remove water from the simulated cross-section. The model also showed clearly that the response of the three-layered system, consisting of a highly weathered zone, a fractured transmissive zone and a less conductive lower schist zone, is governed mainly by the transmissivity and storage coefficient of the middle layer. The storage coefficient of the higher layer has little effect. A two-dimensional model in plan used a description of anisotropy to show that reverse flows can also occur even without a conducting Fault. Modelling of a three-dimensional region using discrete fractures showed that it is certainly possible to simulate systems like that observed at Koongarra, but that large amounts of data are probably needed to obtain realistic descriptions of the fracture networks. Inverse modelling

  7. Columbia River System Operation Review final environmental impact statement. Appendix T: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix documents the public and agency review of the SOR Draft EIS and how the SOR agencies used the review to formulate the FINAL EIS. The appendix includes a summary of the review process, a discussion of the nature of the comments, a list of all commentors, reproductions of comment letters, and responses to all comments. Changes in the EIS text in response to comments are noted in the responses

  8. 75 FR 22737 - Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River

    Science.gov (United States)

    2010-04-30

    ..., and Liability Act (CERCLA), 42 U.S.C. 9607(f), Section 311 of the Federal Water Pollution and Control... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River AGENCY: National Oceanic and Atmospheric...

  9. 76 FR 61261 - Safety Zone; IJSBA World Finals; Lower Colorado River, Lake Havasu, AZ

    Science.gov (United States)

    2011-10-04

    ... navigable waters of Lake Havasu on the lower Colorado River in support of the International Jet Sports... The International Jet Sports Boating Association is sponsoring the IJSBA World Finals. The event will... National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use...

  10. Columbia River System Operation Review final environmental impact statement. Appendix I: Power

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix discusses the work performed by the SOR Power Work Group. The Power Work Group (PWG) had several major responsibilities: first, to determine the effects of each of the various system operating strategies (SOS) on the Northwest regional power system; second, given these effects, to determine what, if any, actions are required to meet forecasted regional energy consumption; and finally, to estimate the cost for serving the forecasted regional energy consumption. The Northwest regional power system consists of Federal and non-Federal hydroelectric power projects (hydropower or hydro projects) on the main stem of the Columbia and Snake Rivers, numerous smaller hydro projects on other river reaches, and a number of thermal plants (coal, nuclear and combustion turbines)

  11. 75 FR 78979 - Application to Export Electric Energy; Twin Rivers Paper Company Inc.

    Science.gov (United States)

    2010-12-17

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-366] Application to Export Electric Energy; Twin Rivers... electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act. DATES... received an application from Twin Rivers for authority to transmit electric energy from the United States...

  12. Columbia River System Operation Review final environmental impact statement. Appendix Q: Regional forum

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The SOR is currently developing a System Operating Strategy (SOS) that will guide the physical operations of the Columbia River system. The SOR is also addressing the institutional arrangements that must be in place to make needed changes to the SOS in the future, or make interpretations of the strategy in the light of changing water conditions or river needs. For convenience, this future institutional arrangement is referred to as ''The Columbia River Regional Forum,'' or simply ''the Forum,'' even though the nature of this institution is still to be determined. This appendix and the Final Environmental Impact Statement (EIS) identify the Forum as an administrative process that will not result in impacts to the environment and will not require analysis in a NEPA context. The composition of and procedures followed by a decision making body cannot--in and of themselves--be used to predict a particular decision with definable impacts on the environment. Nevertheless, because of the relationship to the other SOR actions, the SOR lead agencies have prepared this Technical Appendix to provide opportunities for review and comment on the Forum alternatives

  13. Final environmental statement related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1985-01-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of River Bend Station, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  14. 75 FR 45109 - Kern River Gas Transmission Company; Notice of Availability of the Final Environmental Impact...

    Science.gov (United States)

    2010-08-02

    ... effects of the construction and operation of the Apex Expansion Project in accordance with the... environmental effects of the construction and operation of the following project facilities: [[Page 45110... the Dry Lake Compressor Station located in Clark County, Nevada; Six mainline valves; and Three pig \\2...

  15. Reducing barriers to energy efficiency in the German energy service companies sector. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Koewener, D.; Schleich, J.

    2000-12-01

    This report describes the empirical research conducted in the German energy service sector to assess to what extent energy service companies (ESCOs) can help overcome the barriers to energy in the higher education, brewing and mechanical engineering sectors. This report complements the sector for Germany within the BARRIERS project (Sorrell et al., 2000; Schleich/Boede 2000a; Schleich/Boede 2000b; Schleich et al., 2000). The report characterises the German energy service sector, contains a description and analysis of four case studies in the energy service sector, identifies the main barriers and chances for ESCOs in the higher education, brewery and mechanical engineering sectors, and concludes with brief recommendations on how these barriers may be overcome. The results of the study are summarised here under the following headings: Characterising the energy service sector in Germany; - Case studies of energy service companies in Germany; - The role of ESCOs in the case-study sectors; - Policy implications. (orig.)

  16. Interim Columbia and Snake rivers flow improvement measures for salmon: Final Supplemental Environmental Impact Statement (SEIS)

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    Public comments are sought on this final SEIS, which supplements the 1992 Columbia River Salmon Flow Measures Options Analysis (OA)/Environmental Impact Statement (EIS). The Corps of Engineers, in cooperation with the Bonneville Power Administration and the Bureau of Reclamation proposes five alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. These are: (1) Without Project (no action) Alternative, (2) the 1992 Operation, (3) the 1992 Operation with Libby/Hungry Horse Sensitivity, (4) a Modified 1992 Operation with Improvements to Salmon Flows from Dworshak, and (5) a Modified 1992 Operation with Upper Snake Sensitivity. Alternative 4, Modified 1992 Operations, has been identified as the preferred alternative.

  17. Agribusiness geothermal energy utilization potential of Klamath and Western Snake River Basins, Oregon. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.J.

    1978-03-01

    Resource assessment and methods of direct utilization for existing and prospective food processing plants have been determined in two geothermal resource areas in Oregon. Ore-Ida Foods, Inc. and Amalgamated Sugar Company in the Snake River Basin; Western Polymer Corporation (potato starch extraction) and three prospective industries--vegetable dehydration, alfalfa drying and greenhouses--in the Klamath Basin have been analyzed for direct utilization of geothermal fluids. Existing geologic knowledge has been integrated to indicate locations, depth, quality, and estimated productivity of the geothermal reservoirs. Energy-economic needs and balances, along with cost and energy savings associated with field development, delivery systems, in-plant applications and fluid disposal have been calculated for interested industrial representatives.

  18. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  19. Columbia River system operation review: Final environmental impact statement. Main report exhibits

    International Nuclear Information System (INIS)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d' Alene tribe

  20. Columbia River system operation review: Final environmental impact statement. Appendix R, Pacific Northwest Coordination agreement (PNCA)

    International Nuclear Information System (INIS)

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region's non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region's power producers to maximize the power system's reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest's hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement

  1. Laboratory testing of glasses for Lockheed Idaho Technology Company: Final report

    International Nuclear Information System (INIS)

    Ellison, A.J.G.; Buck, E.C.; Dietz, N.L.; Ebert, W.L.; Luo, J.S.; Wolf, S.F.; Bates, J.K.

    1997-06-01

    Tests have been conducted at Argonne National Laboratory (ANL) in support of the efforts of Lockheed Idaho Technology Company (LITCO) to vitrify high-level waste calcines. Tests were conducted with three classes of LITCO glass formulations: Formula 127 (fluorine-bearing), Formula 532 (fluorine-free), and 630 series (both single- and mixed-alkali) glasses. The test matrices included, as appropriate, the Product Consistency Test Method B (PCT-B), the Materials Characterization Center Test 1 (MCC-1), and the Argonne vapor hydration test (VHT). Test durations ranged from 7 to 183 d. In 7-d PCT-Bs, normalized mass losses of major glass-forming elements for the LITCO glasses are similar to, or lower than, normalized mass losses obtained for other domestic candidate waste glasses. Formula 532 glasses form zeolite alteration phases relatively early in their reaction with water. The formation of those phases increased the dissolution rate. In contrast, the Formula 127 glass is highly durable and forms alteration phases only after prolonged exposure to water in tests with very high surface area to volume ratios; these alteration phases have a relatively small effect on the rate of glass corrosion. No alteration phases formed within the maximum test duration of 183 d in PCT-Bs with the 630 series glasses. The corrosion behavior of the mixed-alkali 630 series glasses is similar to that of 630 series glasses containing sodium alone. In VHTs, both single- and mixed-alkali glasses form zeolite phases that increase the rate of glass reaction. The original 630 series glasses and those based on a revised surrogate calcine formulation react at the same rate in PCT-Bs and form the same major alteration phases in VHTs

  2. Intergrated plant safety assessment. Systematic evaluation program. Palisades plant, Consumers Power Company, Docket No. 50-255. Final report

    International Nuclear Information System (INIS)

    1982-10-01

    The Nuclear Regulatory Commission (NRC) has published its Final Integrated Plant Safety Assessment Report (IPSAR) (NUREG-0820), under the scope of the Systematic Evaluation Program (SEP), for Consumers Power Company's Palisades Plant located in Covert, Van Buren County, Michigan. The SEP was initiated by the NRC to review the design of older operating nuclear reactor plants to reconfirm and document their safety. This report documents the review completed under the SEP for the Palisades Plant. The review has provided for (1) as assessment of the significance of differences between current technical positions on selected safety issues and those that existed when the Palisades Plant was licensed, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety when all supplements to the Final IPSAR and the Safety Evaluation Report for converting the license from a provisional to a full-term license have been issued. The report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the Draft Report, issued in April 1982

  3. Mixing zones studies of the waste water discharge from the Consolidated Paper Company into the Wisconsin River at Wisconsin Rapids, Wisconsin

    Science.gov (United States)

    Hoopes, J. A.; Wu, D. S.; Ganatra, R.

    1973-01-01

    Effluent concentration distributions from the waste water discharge of the Kraft Division Mill, Consolidated Paper Company, into the Wisconsin River at Wisconsin Rapids, Wisconsin, is investigated. Effluent concentrations were determined from measurements of the temperature distribution, using temperature as a tracer. Measurements of the velocity distribution in the vicinity of the outfall were also made. Due to limitations in the extent of the field observations, the analysis and comparison of the measurements is limited to the region within about 300 feet from the outfall. Effects of outfall submergence, of buoyancy and momentum of the effluent and of the pattern and magnitude of river currents on these characteristics are considered.

  4. Final report - Sundyne Company

    Energy Technology Data Exchange (ETDEWEB)

    Long, J.B.

    1994-09-27

    Solar cookers offer a viable alternative to conventional cooking methods in many areas, and can be an effective tool in the fight against the deforestation and desertification that plague many developing countries. However, there have been numerous obstacles to the successful dissemination of solar cookers in the past. The purpose of this paper is to identify opportunities, review constraints and develop a marketing strategy to disseminate the Sundyne Solar Cooker (SSC) in developing countries.

  5. Columbia River system operation review: Final environmental impact statement. Main report

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement

  6. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

  7. Classification of High Spatial Resolution, Hyperspectral Remote Sensing Imagery of the Little Miami River Watershed in Southwest Ohio, USA (Final)

    Science.gov (United States)

    EPA announced the availability of the final report,Classification of High Spatial Resolution, Hyperspectral Remote Sensing Imagery of the Little Miami River Watershed in Southwest Ohio, USA . This report and associated land use/land cover (LULC) coverage is the result o...

  8. Turkish Final Year Medical Students' Exposure to and Attitudes Concerning Drug Company Interactions: A Perspective from a Minimally Regulated Environment for Medical Students.

    Directory of Open Access Journals (Sweden)

    Nazim Ercument Beyhun

    Full Text Available Interactions between drug companies and medical students may affect evidence-based medical practice and patient safety. The aim of this study was to assess drug company-medical student interactions in a medical faculty where limited specific national or institutional regulations apply between drug companies and medical students. The objectives of the study were to determine the exposure and attitudes of final year medical students in terms of drug company-medical student and physician interactions, to identify factors affecting those attitudes and to provide data for policymakers working on the regulation of interactions between drug companies and medical students. This anonymous questionnaire-based study of 154 medical final year medical students at the Karadeniz Technical University Medical Faculty, Trabzon, Turkey, in April and May 2015 attracted a response rate of 92.2% (n/N, 154/164. Exposure to interaction with a pharmaceutical representative was reported by 90.3% (139/154 of students, and 68.8% (106/154 reported experiencing such interaction alongside a resident. In addition, 83.7% (128/153 of students reported an interaction during internship. Furthermore, 69.9% (107/153 of students agreed that interactions influence physicians' prescription preferences, while 33.1% (51/154 thought that a medical student should never accept a gift from a drug company and 24.7% (38/154 agreed with the proposition that "drug companies should not hold activities in medical faculties". Students with rational prescription training expressed greater agreement with the statement "I am skeptical concerning the information provided by drug companies during interactions" than those who had not received such training, and this finding was supported by logistic regression [O.R.(C.I, p -3.7(1.2-11.5, p = 0.022]. Acceptance of advertisement brochures was found to significantly reduce the level of agreement with the proposition that "A physician should not accept any

  9. Turkish Final Year Medical Students' Exposure to and Attitudes Concerning Drug Company Interactions: A Perspective from a Minimally Regulated Environment for Medical Students.

    Science.gov (United States)

    Beyhun, Nazim Ercument; Kolayli, Cevriye Ceyda; Can, Gamze; Topbas, Murat

    2016-01-01

    Interactions between drug companies and medical students may affect evidence-based medical practice and patient safety. The aim of this study was to assess drug company-medical student interactions in a medical faculty where limited specific national or institutional regulations apply between drug companies and medical students. The objectives of the study were to determine the exposure and attitudes of final year medical students in terms of drug company-medical student and physician interactions, to identify factors affecting those attitudes and to provide data for policymakers working on the regulation of interactions between drug companies and medical students. This anonymous questionnaire-based study of 154 medical final year medical students at the Karadeniz Technical University Medical Faculty, Trabzon, Turkey, in April and May 2015 attracted a response rate of 92.2% (n/N, 154/164). Exposure to interaction with a pharmaceutical representative was reported by 90.3% (139/154) of students, and 68.8% (106/154) reported experiencing such interaction alongside a resident. In addition, 83.7% (128/153) of students reported an interaction during internship. Furthermore, 69.9% (107/153) of students agreed that interactions influence physicians' prescription preferences, while 33.1% (51/154) thought that a medical student should never accept a gift from a drug company and 24.7% (38/154) agreed with the proposition that "drug companies should not hold activities in medical faculties". Students with rational prescription training expressed greater agreement with the statement "I am skeptical concerning the information provided by drug companies during interactions" than those who had not received such training, and this finding was supported by logistic regression [O.R.(C.I), p -3.7(1.2-11.5), p = 0.022]. Acceptance of advertisement brochures was found to significantly reduce the level of agreement with the proposition that "A physician should not accept any gift from a

  10. Pollution history of the Savannah River estuary. Final report, September 1, 1976--December 31, 1977

    International Nuclear Information System (INIS)

    Goldberg, E.D.; Hodge, V.; Griffin, J.J.; Koide, M.; Windom, H.

    1978-04-01

    Records of natural and pollutant fluxes to the Savannah River Estuary are found in some river and marsh deposits into which time frames can be introduced by Pb-210 or plutonium geochronologies. Plutonium releases from the Savannah River Plant are evident in only one deposit and in marsh grass which received the transuranic element from atmospheric transport. The pollution records can be disturbed by bioturbative activities of organisms, by the input of marine solid phases to the estuarine deposits, and by river scour and fill

  11. Waterfowl of the Savannah River Plant: Comprehensive cooling water study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, J.J.; Kennamer, R.A.; Hoppe, R.T.

    1986-06-01

    Thirty-one species of waterfowl have been documented on the Savannah River Plant (SPR). The Savannah River Ecology Laboratory (SREL) has been conducting waterfowl research on the site for the past 15 years. This research has included work on waterfowl utilization of the SRP, wood duck reproductive biology, and waterfowl wintering ecology. Results are described.

  12. Monitoring winter flow conditions on the Ivishak River, Alaska : final report.

    Science.gov (United States)

    2017-09-01

    The Sagavanirktok River, a braided river on the Alaska North Slope, flows adjacent to the trans-Alaska pipeline for approximately 100 miles south of Prudhoe Bay. During an unprecedented flooding event in mid-May 2015, the pipeline was exposed in an a...

  13. Columbia River System Operation Review final environmental impact statement. Appendix E: Flood control

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Corps of Engineers, Bonneville Power Administration, and Bureau of Reclamation conducted a scoping process consisting of a series of regionwide public meetings and solicitation of written comments in the summer of 1990. Comments on flood control issues were received from all parts of the Columbia river basin. This appendix includes issues raised in the public scoping process, as well as those brought for consideration by members of the Flood Control Work Group

  14. Columbia River System Operation Review final environmental impact statement. Appendix M: Water quality

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. Analysis of water quality begins with an account of the planning and evaluation process, and continues with a description of existing water quality conditions in the Columbia River Basin. This is followed by an explanation how the analysis was conducted. The analysis concludes with an assessment of the effects of SOR alternatives on water quality and a comparison of alternatives

  15. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  16. Columbia River system operation review: Final environmental impact statement. Appendix N, wildlife

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included

  17. Final Opportunity to Rehabilitate an Urban River as a Water Source for Mexico City

    Science.gov (United States)

    Mazari-Hiriart, Marisa; Pérez-Ortiz, Gustavo; Orta-Ledesma, María Teresa; Armas-Vargas, Felipe; Tapia, Marco A.; Solano-Ortiz, Rosa; Silva, Miguel A.; Yañez-Noguez, Isaura; López-Vidal, Yolanda; Díaz-Ávalos, Carlos

    2014-01-01

    The aim of this study was to evaluate the amount and quality of water in the Magdalena-Eslava river system and to propose alternatives for sustainable water use. The system is the last urban river in the vicinity of Mexico City that supplies surface water to the urban area. Historical flow data were analyzed (1973–2010), along with the physicochemical and bacteriological attributes, documenting the evolution of these variables over the course of five years (2008–2012) in both dry and rainy seasons. The analyses show that the flow regime has been significantly altered. The physicochemical variables show significant differences between the natural area, where the river originates, and the urban area, where the river receives untreated wastewater. Nutrient and conductivity concentrations in the river were equivalent to domestic wastewater. Fecal pollution indicators and various pathogens were present in elevated densities, demonstrating a threat to the population living near the river. Estimates of the value of the water lost as a result of mixing clean and contaminated water are presented. This urban river should be rehabilitated as a sustainability practice, and if possible, these efforts should be replicated in other areas. Because of the public health issues and in view of the population exposure where the river flows through the city, the river should be improved aesthetically and should be treated to allow its ecosystem services to recover. This river represents an iconic case for Mexico City because it connects the natural and urban areas in a socio-ecological system that can potentially provide clean water for human consumption. Contaminated water could be treated and reused for irrigation in one of the green areas of the city. Wastewater treatment plants and the operation of the existing purification plants are urgent priorities that could lead to better, more sustainable water use practices in Mexico City. PMID:25054805

  18. Final opportunity to rehabilitate an urban river as a water source for Mexico City.

    Directory of Open Access Journals (Sweden)

    Marisa Mazari-Hiriart

    Full Text Available The aim of this study was to evaluate the amount and quality of water in the Magdalena-Eslava river system and to propose alternatives for sustainable water use. The system is the last urban river in the vicinity of Mexico City that supplies surface water to the urban area. Historical flow data were analyzed (1973-2010, along with the physicochemical and bacteriological attributes, documenting the evolution of these variables over the course of five years (2008-2012 in both dry and rainy seasons. The analyses show that the flow regime has been significantly altered. The physicochemical variables show significant differences between the natural area, where the river originates, and the urban area, where the river receives untreated wastewater. Nutrient and conductivity concentrations in the river were equivalent to domestic wastewater. Fecal pollution indicators and various pathogens were present in elevated densities, demonstrating a threat to the population living near the river. Estimates of the value of the water lost as a result of mixing clean and contaminated water are presented. This urban river should be rehabilitated as a sustainability practice, and if possible, these efforts should be replicated in other areas. Because of the public health issues and in view of the population exposure where the river flows through the city, the river should be improved aesthetically and should be treated to allow its ecosystem services to recover. This river represents an iconic case for Mexico City because it connects the natural and urban areas in a socio-ecological system that can potentially provide clean water for human consumption. Contaminated water could be treated and reused for irrigation in one of the green areas of the city. Wastewater treatment plants and the operation of the existing purification plants are urgent priorities that could lead to better, more sustainable water use practices in Mexico City.

  19. Final opportunity to rehabilitate an urban river as a water source for Mexico City.

    Science.gov (United States)

    Mazari-Hiriart, Marisa; Pérez-Ortiz, Gustavo; Orta-Ledesma, María Teresa; Armas-Vargas, Felipe; Tapia, Marco A; Solano-Ortiz, Rosa; Silva, Miguel A; Yañez-Noguez, Isaura; López-Vidal, Yolanda; Díaz-Ávalos, Carlos

    2014-01-01

    The aim of this study was to evaluate the amount and quality of water in the Magdalena-Eslava river system and to propose alternatives for sustainable water use. The system is the last urban river in the vicinity of Mexico City that supplies surface water to the urban area. Historical flow data were analyzed (1973-2010), along with the physicochemical and bacteriological attributes, documenting the evolution of these variables over the course of five years (2008-2012) in both dry and rainy seasons. The analyses show that the flow regime has been significantly altered. The physicochemical variables show significant differences between the natural area, where the river originates, and the urban area, where the river receives untreated wastewater. Nutrient and conductivity concentrations in the river were equivalent to domestic wastewater. Fecal pollution indicators and various pathogens were present in elevated densities, demonstrating a threat to the population living near the river. Estimates of the value of the water lost as a result of mixing clean and contaminated water are presented. This urban river should be rehabilitated as a sustainability practice, and if possible, these efforts should be replicated in other areas. Because of the public health issues and in view of the population exposure where the river flows through the city, the river should be improved aesthetically and should be treated to allow its ecosystem services to recover. This river represents an iconic case for Mexico City because it connects the natural and urban areas in a socio-ecological system that can potentially provide clean water for human consumption. Contaminated water could be treated and reused for irrigation in one of the green areas of the city. Wastewater treatment plants and the operation of the existing purification plants are urgent priorities that could lead to better, more sustainable water use practices in Mexico City.

  20. Columbia River System Operation Review final environmental impact statement. Appendix G: Land use and development

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. The SOR began in early 1990, prior to the filing of petitions for endangered status for several salmon species under the Endangered Species Act. The comprehensive review of Columbia River operations encompassed by the SOR was prompted by the need for Federal decisions to (1) develop a coordinated system operating strategy (SOS) for managing the multiple uses of the system into the 21st century; (2) provide interested parties with a continuing and increased long-term role in system planning (Columbia River Regional Forum); (3) renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA), a contractual arrangement among the region's major hydroelectric-generating utilities and affected Federal agencies to provide for coordinated power generation on the Columbia River system; and (4) renew or develop new Canadian Entitlement Allocation Agreements. The review provides the environmental analysis required by the National Environmental Policy Act (NEPA). This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR

  1. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

  2. Patterns of fish assemblage structure and dynamics in waters of the Savannah River Plant. Comprehensive Cooling Water Study final report

    Energy Technology Data Exchange (ETDEWEB)

    Aho, J.M.; Anderson, C.S.; Floyd, K.B.; Negus, M.T.; Meador, M.R.

    1986-06-01

    Research conducted as part of the Comprehensive Cooling Water Study (CCWS) has elucidated many factors that are important to fish population and community dynamics in a variety of habitats on the Savannah River Plant (SRP). Information gained from these studies is useful in predicting fish responses to SRP operations. The overall objective of the CCWS was (1) to determine the environmental effects of SRP cooling water withdrawals and discharges and (2) to determine the significance of the cooling water impacts on the environment. The purpose of this study was to: (1) examine the effects of thermal plumes on anadromous and resident fishes, including overwintering effects, in the SRP swamp and associated tributary streams; (2) assess fish spawning and locate nursery grounds on the SRP; (3) examine the level of use of the SRP by spawning fish from the Savannah River, this objective was shared with the Savannah River Laboratory, E.I. du Pont de Nemours and Company; and (4) determine impacts of cooling-water discharges on fish population and community attributes. Five studies were designed to address the above topics. The specific objectives and a summary of the findings of each study are presented.

  3. Turkish Final Year Medical Students’ Exposure to and Attitudes Concerning Drug Company Interactions: A Perspective from a Minimally Regulated Environment for Medical Students

    Science.gov (United States)

    Beyhun, Nazim Ercument; Kolayli, Cevriye Ceyda; Can, Gamze; Topbas, Murat

    2016-01-01

    Interactions between drug companies and medical students may affect evidence-based medical practice and patient safety. The aim of this study was to assess drug company–medical student interactions in a medical faculty where limited specific national or institutional regulations apply between drug companies and medical students. The objectives of the study were to determine the exposure and attitudes of final year medical students in terms of drug company–medical student and physician interactions, to identify factors affecting those attitudes and to provide data for policymakers working on the regulation of interactions between drug companies and medical students. This anonymous questionnaire-based study of 154 medical final year medical students at the Karadeniz Technical University Medical Faculty, Trabzon, Turkey, in April and May 2015 attracted a response rate of 92.2% (n/N, 154/164). Exposure to interaction with a pharmaceutical representative was reported by 90.3% (139/154) of students, and 68.8% (106/154) reported experiencing such interaction alongside a resident. In addition, 83.7% (128/153) of students reported an interaction during internship. Furthermore, 69.9% (107/153) of students agreed that interactions influence physicians’ prescription preferences, while 33.1% (51/154) thought that a medical student should never accept a gift from a drug company and 24.7% (38/154) agreed with the proposition that “drug companies should not hold activities in medical faculties”. Students with rational prescription training expressed greater agreement with the statement “I am skeptical concerning the information provided by drug companies during interactions” than those who had not received such training, and this finding was supported by logistic regression [O.R.(C.I), p -3.7(1.2–11.5), p = 0.022]. Acceptance of advertisement brochures was found to significantly reduce the level of agreement with the proposition that “A physician should not

  4. Columbia River System Operation Review final environmental impact statement. Appendix P: Canadian Entitlement Allocation Agreements (CEAA)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The purpose of this technical appendix is to provide the environmental review necessary to enter into agreements regarding the distribution between Federal and non-Federal project owners with respect to delivery of the Canadian Entitlement obligation to Canada for the period 1998 through 2024

  5. Columbia River System Operation Review final environmental impact statement. Appendix L: Soils, geology and groundwater

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix addresses the study of geology, soils, and groundwater concerns relative to the System Operation Review (SOR). Chapter 1 provides an overview of the study, scope, and process for this resource area. In order, the respective sections of this chapter discuss the relevant issues for the study, and the means by which the SOR team carried out the study

  6. Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Glaspey, Douglas J.

    2008-01-30

    Incorporates the results of flow tests for geothermal production and injection wells in the Raft River geothermal field in southern Idaho. Interference testing was also accomplished across the wellfield.

  7. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

  8. Columbia River System Operation Review final environmental impact statement. Appendix H: Navigation

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Navigation Technical Appendix presents the analysis of the various SOR alternatives in terms of their potential affects on the congressionally authorized navigation system within the Columbia and Snake river waterways. The focus of the study, impacts to the authorized navigation, improvements/developments, reflects on one of the continuing historical missions of the US Army Corps of Engineers: to promote safe commercial navigation of the nation's waterways benefiting the development of commerce within the US. The study and evaluation process involved Scoping, Screening and Full Scale Evaluation. During screening two models were developed; one was used to evaluate the effects of the various alternatives on navigation through the Snake River Projects and the other the effects on the Dworshak Pool. Full Scale Analysis was expanded to included a study of effects throughout the system

  9. Columbia River System Operation Review final environmental impact statement. Appendix K: Resident fish

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. In this appendix the Resident Fish Work Group (RFWG) has attempted to characterize and evaluate impacts of dam operation on an extremely complex and diverse integrated resource. Not only is this required under the National Environmental Policy Act (NEPA) for SOR, there are resident fish populations that have status under the Federal Endangered Species Act (ESA) or equivalent state regulations (Kootenai River white sturgeon, Snake River white sturgeon, sandroller, shorthead and torrent sculpins, bull trout, westslope cutthroat trout, redband trout, and burbot). The RFWG has also attempted to develop operating alternatives that benefit not only resident fish, but anadromous fish, wildlife, and other human interests as well. The authors have recognized the co-evolution of resident fish, anadromous fish, and other integrated resources in the basin

  10. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    Science.gov (United States)

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  11. Final Report for the Intermountain Center for River Rehabilitation and Restoration (ICRRR)

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, John C. [Utah State Univ., Logan, UT (United States)

    2016-08-19

    The Intermountain Center for River Rehabilitation and Restoration (ICRRR) was created in 2006 by the Department of Watershed Sciences to help meet the challenge of reversing national trends in freshwater ecosystem degradation. The ICRRR was disbanded in 2015, and its activities were transferred to other research centers within the Department of Watershed Sciences. The mission of the ICRRR was to advance the science and practice of river restoration and environmental management and to transfer that knowledge to the public and private sectors by undertaking targeted research, teaching, and extension/outreach activities. The ICRRR had two foci: restoration practices of small streams and rehabilitation of intermediate and large rivers. The ICRRR focused its work in the western United States.

  12. Atmospheric deposition of nutrients to north Florida rivers: A multivariate statistical analysis. Final report. Master's thesis

    International Nuclear Information System (INIS)

    Fu, J.

    1991-01-01

    Atmospheric nutrient input to the Apalachicola Bay estuary was studied because it has been demonstrated that atmospheric deposition can be a major source of nutrients to eastern U.S. estuaries. Besides the Apalachicola River, the Sopchoppy and the Ochlockonee were also selected for a comparative analysis. Receptor model, absolute principal of component analysis (APCA), and mass balance methods were applied in the study. The results of the study show that nitrogen is probably not a limiting nutrient in the three rivers because their N:P mole ratios are nearly 3 times higher than the Redfield ratio for photosynthesis. The total atmospheric nitrogen depositions in the three river watershed are at least as great as their river fluxes. In the Apalachicola River, the atmospheric source of nitrogen is found to be several times higher than the largest possible input of urban sewage. Atmospheric deposition, therefore, might be the dominant nitrogen source entering the estuary. The results of APCA show that Apalachicola River water is mainly a mixture of components that correspond in their compositions to aged rain, ground water, and fresh rain. Atmospheric nitrate deposition is the result of the air pollution, i.e., acid rain. The studies also show that the annual average deposition of nitrate has a narrow range, mainly from 5.8 to 11.5 kg/ha/yr in most of the NADP sites in the 8 southeastern states. Since all the software and data sets employed in the study are accessible nationwide, the methods could be applied in other watersheds

  13. 77 FR 61631 - Final Environmental Impact Statement for Stehekin River Corridor Implementation Plan, Lake Chelan...

    Science.gov (United States)

    2012-10-10

    ... scenic resources and threats within debris flow hazard zones. Decision Process: Not sooner than 30 days... natural processes of the Stehekin River; and (3) partner with the Stehekin Community to provide services... priorities in the floodplain, and therefore far fewer private parcels would be high priority for purchase or...

  14. Biological Ocean Margins Program. Active Microbes Responding to Inputs from the Orinoco River Plume. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Jorge E. Corredor

    2013-01-28

    The overall goal of the proposed work is to identify the active members of the heterotrophic community involved in C and N cycling in the perimeter of the Orinoco River Plume (ORP), assess their spatial distribution, quantify their metabolic activity, and correlate these parameters to plume properties such as salinity, organic matter content and phytoplankton biomass.

  15. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  16. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  17. Analysis of satisfaction of final consumers: a study in a company of Vending Machines sector in the city of Santa Maria – RS

    Directory of Open Access Journals (Sweden)

    Maíra Nunes Piveta

    2016-06-01

    Full Text Available Organizations are inserted in a globalized competitive environment that suffers transformations and constantly advances. Given this scenario, the Alpha company, which sells coffee vending machines and supplies, adopted as a strategy to approach their final consumers. In this way, the overall objective of this study was to identify and assess the degree of satisfaction of the consumers of Alpha company with respect to the products and drinks and digital marketing in social media. The search can be classified as descriptive as to the nature with quantitative approach through the implementation of a research tool with a sample of 120 consumers of Alpha company at the points of sale. The survey results indicated that, in general, the satisfaction of consumers for products Alpha is great, except when it comes to price and quantity of sugar. Still, it was observed that the scope of the actions of Alpha digital marketing is low, being evidenced by means of low degrees of satisfaction justified by lack of consumer knowledge. Finally, opportunities and suggestions for improvement were presented.

  18. Integrated Project Management Planning for the Deactivation of the Savannah River Site F-Canyon Complex

    Energy Technology Data Exchange (ETDEWEB)

    Clark, T.G.

    2000-12-01

    This paper explains the planning process that is being utilized by the Westinghouse Savannah River Company to take the F-Canyon Complex facilities from operations to a deactivated condition awaiting final decommissioning.

  19. Stock Identification of Columbia River Chinook Salmon and Steelhead Trout, 1986 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Carl B.; Li, Hiran W.; Hjort, Randy C.

    1986-08-01

    For the first time genetic similarities among chinook salmon and among steelhead trout stocks of the Columbia River were determined using a holistic approach including analysis of life history, biochemical, body shape and meristic characters. We examined between year differences for each of the stock characteristics and we also correlated the habitat characteristics with the wild stock characteristics. The most important principle for managing stocks of Columbia River chinook salmon and steelhead trout is that geographically proximal stocks tend to be like each other. Run timing and similarity of the stream systems should be taken into account when managing stocks. There are similarities in the classifications derived for chinook salmon and steelhead trout. Steelhead trout or chinook salmon tend to be genetically similar to other steelhead or chinook stocks, respectively, that originate from natal streams that are geographically close, regardless of time of freshwater entry. The primary exception Lo this trend is between stocks of spring and fall chinook in the upper Columbia River where fish with the different run timings are dissimilar, though geographically proximate stocks within a run form are generally very similar. Spring chinook stocks have stronger affinities to other spring chinook stocks that originate in the same side of the Cascade Range than to these Spring chinook stock: spawned on the other side of the Cascade Range. Spring chinook from west of the Cascades are more closely related to fall chinook than they are to spring chinook from east of the Cascades. Summer chinook can be divided into two main groups: (1) populations in the upper Columbia River that smolt as subyearlings and fall chinook stocks; and (2) summer chinook stocks from the Salmon River, Idaho, which smolt as yearlings and are similar to spring chinook stocks from Idaho. Fall chinook appear to comprise one large diverse group that is not easily subdivided into smaller subgroups. In

  20. Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-05-24

    Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  1. Study on the control of groundwater hazard at Gays river mine: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This report outlines a study to assess and investigate sources of groundwater inflow to Westminer Canada Ltd.'s Gays River lead-zinc mine in Nova Scotia. The study consisted of a hydrochemical assessment, a review of drainhole well screens and an underground pressure point measurement program, preparation of a , an airphoto interpretation study of sinkhole features, and a major piezometer installation and overburden soil investigation program. This report provides an overview of the program.

  2. Instream Flows Incremental Methodology :Kootenai River, Montana : Final Report 1990-2000.

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Greg; Skaar, Don; Dalbey, Steve (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2002-11-01

    Regulated rivers such as the Kootenai River below Libby Dam often exhibit hydrographs and water fluctuation levels that are atypical when compared to non-regulated rivers. These flow regimes are often different conditions than those which native fish species evolved with, and can be important limiting factors in some systems. Fluctuating discharge levels can change the quantity and quality of aquatic habitat for fish. The instream flow incremental methodology (IFIM) is a tool that can help water managers evaluate different discharges in terms of their effects on available habitat for a particular fish species. The U.S. Fish and Wildlife Service developed the IFIM (Bovee 1982) to quantify changes in aquatic habitat with changes in instream flow (Waite and Barnhart 1992; Baldridge and Amos 1981; Gore and Judy 1981; Irvine et al. 1987). IFIM modeling uses hydraulic computer models to relate changes in discharge to changes in the physical parameters such as water depth, current velocity and substrate particle size, within the aquatic environment. Habitat utilization curves are developed to describe the physical habitat most needed, preferred or tolerated for a selected species at various life stages (Bovee and Cochnauer 1977; Raleigh et al. 1984). Through the use of physical habitat simulation computer models, hydraulic and physical variables are simulated for differing flows, and the amount of usable habitat is predicted for the selected species and life stages. The Kootenai River IFIM project was first initiated in 1990, with the collection of habitat utilization and physical hydraulic data through 1996. The physical habitat simulation computer modeling was completed from 1996 through 2000 with the assistance from Thomas Payne and Associates. This report summarizes the results of these efforts.

  3. Lower Columbia River and Estuary Habitat Monitoring Study, 2011 - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Borde, Amy B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kaufmann, Ronald M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cullinan, Valerie I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Thom, Ronald M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wright, Cynthia L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-03-01

    The Ecosystem Monitoring Program is a collaborative effort between the Lower Columbia River Estuary Partnership (LCREP), University of Washington, Wetland Ecosystem Team (UW), US Geological Survey, Water Science Center (USGS), National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA-Fisheries, hereafter NOAA), and Pacific Northwest National Laboratory, Marine Sciences Laboratory (PNNL). The goal of the program is to conduct emergent wetland monitoring aimed at characterizing salmonid habitats in the lower Columbia River and estuary (LCRE) from the mouth of the estuary to Bonneville Dam (Figure 1). This is an ecosystem based monitoring program focused on evaluating status and trends in habitat and reducing uncertainties regarding these ecosystems to ultimately improve the survival of juvenile salmonids through the LCRE. This project comprehensively assesses habitat, fish, food web, and abiotic conditions in the lower river, focusing on shallow water and vegetated habitats used by juvenile salmonids for feeding, rearing and refugia. The information is intended to be used to guide management actions associated with species recovery, particularly that of threatened and endangered salmonids. PNNL’s role in this multi-year study is to monitor the habitat structure (e.g., vegetation, topography, channel morphology, and sediment type) as well as hydrologic patterns.

  4. Impact of impingement on the Hudson River white perch population. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Barnthouse, L.W.; Van Winkle, W.; Kirk, B.L.; Vaughan, D.S.

    1982-02-01

    This report summarizes a series of analyses of the magnitude and biological significance of the impingement of white perch at the Indian Point Nuclear Generating Station and other Hudson River power plants. Included in these analyses were evaluations of: (1) two independent lines of evidence relating to the magnitude of impingement impacts on the Hudson River white perch population; (2) the additional impact caused by entrainment of white perch; (3) data relating to density-dependent growth among young-of-the-year white perch; (4) the feasibility of performing population-level analyses of impingement impacts on the white perch populations of Chesapeake Bay and the Delaware River; and (5) the feasibility of using simple food chain and food web models to evaluate community-level effects of impingement and entrainment. Estimated reductions in the abundances of the 1974 and 1975 white perch year classes, caused by impingement and entrainment, were high enough that the possibility of adverse long-term effects cannot be excluded.

  5. Final environmental statement related to the Minerals Exploration Company, Sweetwater Uranium Project (Sweetwater County, Wyoming). Docket No. 40-8584

    International Nuclear Information System (INIS)

    1978-12-01

    The proposed action is the issuance of a Source Material License to Minerals Exploration Company (MEC) for the construction and operation of the proposed Sweetwater Uranium Mill in Sweetwater County, Wyoming, with a nominal capacity of 3000 tons (2.7 x 10 6 kg) per day of uranium ore. As part of this proposal, the applicant proposes also to construct a heap leaching and resin ion-exchange facility to extract uranium from low-grade ores and mine water. Conditions for the protection of the environment are set forth

  6. FINAL TECHNICAL REPORT-THE ECOLOGY AND GENOMICS OF CO2 FIXATIION IN OCEANIC RIVER PLUMES

    Energy Technology Data Exchange (ETDEWEB)

    PAUL, JOHN H

    2013-06-21

    Oceanic river plumes represent some of the most productive environments on Earth. As major conduits for freshwater and nutrients into the coastal ocean, their impact on water column ecosystems extend for up to a thousand km into oligotrophic oceans. Upon entry into the oceans rivers are tremendous sources of CO2 and dissolved inorganic carbon (DIC). Yet owing to increased light transmissivity from sediment deposition coupled with the influx of nutrients, dramatic CO2 drawdown occurs, and plumes rapidly become sinks for CO2. Using state-of-the-art gene expression technology, we have examined the molecular biodiversity of CO2 fixation in the Mississippi River Plume (MRP; two research cruises) and the Orinoco River Plume (ORP; one cruise). When the MRP extends far into the Gulf because of entrainment with the Loop Current, MRP production (carbon fixation) can account for up to 41% of the surface production in the Gulf of Mexico. Nearer-shore plume stations (“high plume,” salinity< 32 ppt) had tremendous CO2 drawdown that was correlated to heterokont (principally diatom) carbon fixation gene expression. The principal form of nitrogen for this production based upon 15N studies was urea, believed to be from anthropogenic origin (fertilizer) from the MRP watershed. Intermediate plume environments (salinity 34 ppt) were characterized by high levels of Synechococcuus carbon fixation that was fueled by regenerated ammonium. Non-plume stations were characterized by high light Prochlorococcus carbon fixation gene expression that was positively correlated with dissolved CO2 concentrations. Although data from the ORP cruise is still being analyzed, some similarities and striking differences were found between the ORP and MRP. High levels of heterokont carbon fixation gene expression that correlated with CO2 drawdown were observed in the high plume, yet the magnitude of this phenomenon was far below that of the MRP, most likely due to the lower levels of anthropogenic

  7. Flathead River Instream Flow Investigation Project : Final Report 1996-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Miller, William J. (Miller Ecological Consultants., Fort Collins, CO); Ptacek, Jonathan A. (Miller Ecological Consultants, Inc., Fort Collins, CO)

    2003-09-01

    A modified Instream Flow Incremental Methodology (IFIM) approach was used on the mainstem Flathead River from the South Fork Flathead River downstream to Flathead Lake. The objective of this study was to quantify changes in habitat for the target fish species, bull trout (Salvelinus confluentus) and west slope cutthroat trout (Oncorhynchus clarki lewisi), as a function of discharge in the river. This approach used a combination of georeferenced field data for each study site combined with a two-dimensional hydraulic simulation of river hydraulic characteristics. The hydraulic simulations were combined with habitat suitability criteria in a GIS analysis format to determine habitat area as a function of discharge. Results of the analysis showed that habitat area is more available at lower discharges than higher discharges and that in comparison of the pre-dam hydrology with post-dam hydrology, the stable pre-dam baseflows provided more stable habitat than the highly variable flow regime during both summer and winter baseflow post-dam periods. The variability week to week and day to day under post-dam conditions waters and dewaters stream margins. This forces sub-adult fish, in particular bull trout, to use less productive habitat during the night. There is a distinct difference between daytime and nighttime habitat use for bull trout sub-adults. The marginal areas that are constantly wet and then dried provide little in productivity for lower trophic levels and consequently become unproductive for higher trophic levels, especially bull trout sub-adults that use those areas as flows increase. A stable flow regime would be more productive than flow regimes with high variability week to week. The highly variable flows likely put stress on a bull trout subadult and west slope cutthroat trout, due to the additional movement required to find suitable habitat. The GIS approach presented here provides both a visual characterization of habitat as well as Arcview project data

  8. Redd Site Selection and Spawning Habitat Use by Fall Chinook Salmon, Hanford Reach, Columbia River : Final Report 1995 - 1998.

    Energy Technology Data Exchange (ETDEWEB)

    Geist, David R.

    1999-05-01

    year to year. The tendency to spawn in clusters suggests fall chinook salmon's use of spawning habitat is highly selective. Hydraulic characteristics of the redd clusters were significantly different than the habitat surrounding them. Velocity and lateral slope of the river bottom were the most important habitat variables in predicting redd site selection. While these variables explained a large proportion of the variance in redd site selection (86 to 96%), some unmeasured factors still accounted for a small percentage of actual spawning site selection. Chapter three describes the results from an investigation into the hyporheic characteristics of the two spawning areas studied in chapter two. This investigation showed that the magnitude and chemical characteristics of hyporheic discharge were different between and within two spawning areas. Apparently, fall chinook salmon used chemical and physical cues from the discharge to locate spawning areas. Finally, chapter four describes a unique method that was developed to install piezometers into the cobble bed of the Columbia River.

  9. 75 FR 61619 - Safety Zone; IJSBA World Finals, Lower Colorado River, Lake Havasu, AZ

    Science.gov (United States)

    2010-10-06

    ... Sports Boating Association (IJSBA) World Finals. This temporary safety zone is necessary to provide for... International Jet Sports Boating Association (IJSBA) is sponsoring the IJSBA World Finals. The event will... 13211. Technical Standards The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272...

  10. Alligator rivers analogue project. Final report; volume 1; summary of findings

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    The Koongarra uranium ore deposit is located in the Alligator Rivers Region of the Northern Territory of Australia. Many of the processes that have controlled the development of this natural system are relevant to the performance assessment of radioactive waste repositories. An agreement was reached in 1987 by a number of agencies concerned with radioactive waste disposal to set up the International Alligator Rivers Analogue Project (ARAP) to study relevant aspects of the hydrological and geochemical evolution of the site. The Project ran for five years. The aims of the study were: to contribute to the production of reliable and realistic models for radionuclide migration within geological environments relevant to the assessment of the safety of radioactive waste repositories; to develop methods of validation of models using a combination of laboratory and field data associated with the Koongarra uranium deposit; and to encourage maximum interaction between modellers and experimentalists in achieving these objectives. It was anticipated that the substantial databases generated in the field and laboratory studies would then be used to develop and test geochemical and radionuclide transport models. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project is one of a series of 16 volumes

  11. RIVERTON DOME GAS EXPLORATION AND STIMULATION TECHNOLOGY DEMONSTRATION, WIND RIVER BASIN, WYOMING; FINAL

    International Nuclear Information System (INIS)

    Dr. Ronald C. Surdam

    1999-01-01

    A primary objective of the Institute for Energy Research (IER)-Santa Fe Snyder Corporation DOE Riverton Dome project is to test the validity of a new conceptual model and resultant exploration paradigm for so-called ''basin center'' gas accumulations. This paradigm and derivative exploration strategy suggest that the two most important elements crucial to the development of prospects in the deep, gas-saturated portions of Rocky Mountain Laramide Basins (RMLB) are (1) the determination and, if possible, three-dimensional evaluation of the pressure boundary between normal and anomalous pressure regimes (i.e., this boundary is typically expressed as a significant inversion in both sonic and seismic velocity-depth profiles) , and (2) the detection and delineation of porosity/permeability ''sweet spots'' (i.e., areas of enhanced storage capacity and deliverability) in potential reservoir targets below this boundary. There are other critical aspects in searching for basin center gas accumulations, but completion of these two tasks is essential to the successful exploration for the unconventional gas resources present in anomalously pressured rock/fluid systems in the Rocky Mountain Laramide Basins. The southern Wind River Basin, in particular the Riverton Dome and Emigrant areas, is a neat location for testing this exploration paradigm. Preliminary work within the Wind River Basin has demonstrated that there is a regionally prominent pressure surface boundary that can be detected by inversions in sonic velocity depth gradients in individual well log profiles and that can be seen as a velocity inversion on seismic lines. Also, the Wind River Basin in general-and the Riverton Dome area specially-is characterized by a significant number of anomalously pressured gas accumulations. Most importantly, Santa Fe Snyder Corporation has provided the study with sonic logs, two 3-D seismic studies (40 mi(sup 2) and 30 mi(sup 2)) and a variety of other necessary geological and

  12. Aerial gamma ray and magnetic survey: Powder River II Project, Gillette Quadrangle, Wyoming. Final report

    International Nuclear Information System (INIS)

    1979-04-01

    The Gillette quadrangle in northeastern Wyoming and western South Dakota contains approximately equal portions of the Powder River Basin and the Black Hills Uplift. In these two structures, a relatively thick sequence of Paleozoic and Mesozoic strata represent nearly continuous deposition over the Precambrian basement complex. The Powder River Basin also contains a thick sequence of early Tertiary rocks which cover about 50% of the surface. A stratigraphic sequence from Upper Cretaceous to Precambrian is exposed in the Black Hills Uplift to the east. Magnetic data apparently illustrate the relative depth to the Precambrian crystalline rocks, but only weakly define the boundary between the Powder River Basin and the Black Hills Uplift. The positions of some small isolated Tertiary intrusive bodies in the Black Hills Uplift are relatively well expressed. The Gillette quadrangle has been productive in terms of uranium mining, but its current status is uncertain. The producing uranium deposits occur within the Lower Cretaceous Inyan Kara Group and the Jurassic Morrison Formation in the Black Hills Uplift. Other prospects occur within the Tertiary Wasatch and Fort Union Formations in the Pumpkin Buttes - Turnercrest district, where it extends into the quadrangle from the Newcastle quadrangle to the south. These four formations, all predominantly nonmarine, contain all known uranium deposits in the Gillette quadrangle. A total of 108 groups of sample responses in the uranium window constitute anomalies as defined in Volume I. The anomalies are most frequently found in the Inyan Kara-Morrison, Wasatch and Fort Union Formations. Many anomalies occur over known mines or prospects. Others may result from unmapped uranium mines or areas where material other than uranium is mined. The remainder may relate to natural geologic features

  13. Lower Columbia River salmon business plan for terminal fisheries. Final report

    International Nuclear Information System (INIS)

    1996-07-01

    Salmon fishing in the Northwest requires a public-private partnership. The public through its decision-makers, agencies, and laws states it will do all that is necessary to protect and preserve the valuable salmon resource. Yet, the public side of the partnership is broken. The Columbia River salmon fishing industry, with over 140 years of documented history, is at a crossroads. This report explores a variety of issues, concerns, and ideas related to terminal fishery development. In some cases recommendations are made. In addition, options are explored with an understanding that those designated as decision-makers must make decisions following considerable discussion and reflection

  14. Lower Columbia River Salmon Business Plan for Terminal Fisheries : Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Salmon For All

    1996-07-01

    Salmon fishing in the Northwest requires a public-private partnership. The public through its decision-makers, agencies, and laws states it will do all that is necessary to protect and preserve the valuable salmon resource. Yet, the public side of the partnership is broken. The Columbia River salmon fishing industry, with over 140 years of documented history, is at a crossroads. This report explores a variety of issues, concerns, and ideas related to terminal fishery development. In some cases recommendations are made. In addition, options are explored with an understanding that those designated as decision-makers must make decisions following considerable discussion and reflection.

  15. Airborne gamma-ray spectrometer and magnetometer survey, Meade River Quadrangle, Alaska. Final report

    International Nuclear Information System (INIS)

    1981-02-01

    The results obtained from an airborne high sensitivity gamma-ray spectrometer and magnetometer survey over the Meade River map area of Alaska are presented. Based on the criteria outlined in the general section on interpretation, a total of eight uranium anomalies have been outlined on the interpretation map. Most of these are only weakly to moderately anomalous. Zones 3 and 7 are relatively better than the others though none of the anomalies are thought to be of any economic significance. No follow-up work is recommended

  16. Final environmental statement related to the operation of Limerick Generating Station, Units 1 and 2, Docket Nos. 50-352 and 50-353, Philadelphia Electric Company

    International Nuclear Information System (INIS)

    1989-08-01

    In April 1984 the staff of the Nuclear Regulatory Commission issued its Final Environmental Statement (NUREG-0974) related to the operation of Limerick Generating Station, Units 1 and 2, (Docket Nos. 50-352 and 50-353), located on the Schuylkill River, near Pottstown, in Limerick Township, Montgomery and Chester Counties, Pennsylvania. The NRC has prepared this supplement to NUREG-0974 to present its evaluation of the alternative of facility operation with the installation of further severe accident mitigation design features. The NRC staff has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns nor significant new circumstances or information relevant to environmental concerns and bearing on the licensing of Limerick Generating Station, Units 1 and 2. 15 refs., 10 tabs

  17. 76 FR 40950 - Public Company Accounting Oversight Board; Notice of Filing of Proposed Board Funding Final Rules...

    Science.gov (United States)

    2011-07-12

    ... available, the issuer's net asset value. (i)(v) Issuer Accounting Support Fee The term ``issuer accounting... Accounting Oversight Board; Notice of Filing of Proposed Board Funding Final Rules for Allocation of the Board's Accounting Support Fee Among Issuers, Brokers, and Dealers, and Other Amendments to the Board's...

  18. Final Report - Conservation & Renewable Energy Potential Study For Smith River Rancheria

    Energy Technology Data Exchange (ETDEWEB)

    Greg Retzlaff

    2007-07-01

    In January 2006 the Smith River Rancheria (SRR), located in Smith River, California, contracted with the team of Strategic Energy Solutions (SES) and Evergreen NRG to conduct a study for the community. The objective of the study was to identify renewable generation opportunities that would facilitate Rancheria energy independence through SRR owned and operated power projects. These generation facilities were to be located either on or near the reservation. Specifically, the Rancheria was interested in the viability of generating electric power using biomass and wind fuel resources. Initial research identified that a very small portion of the community's energy could be offset by renewable energy generation due to the low solar resource in this area, and the lack of significant wind or biomass resources on or near reservation land. Some larger projects were identified which offered little or no benefit to the Rancheria. As a result, the scope of this study was changed in October 2006 to focus on energy efficiency opportunities for key reservation facilities, with a continued analysis of smaller renewable energy opportunities within reservation boundaries. The consulting team initially performed a resource analysis for biomass and solar generation opportunities in the region of the Rancheria. It was quickly concluded that none of these options would yield renewable power for the Rancheria at costs competitive with current utility sources, and that any larger installations would require substantial funding that may not be available. Having made these conclusions early on, the study effort was redirected and the team investigated each of the major Rancheria buildings to look for solar, wind and conservation opportunities. The buildings were audited for energy use and the roof areas were examined for exposure of solar radiation. Wind resources were also investigated to determine if smaller wind turbines would offer power generation at a reasonable cost.

  19. Health assessment for Maywood Chemical Company, Maywood, Bergen County, New Jersey, Region 2. CERCLIS No. NJD980529762. Final report

    International Nuclear Information System (INIS)

    1990-01-01

    The Health Assessment for the Maywood Chemical Company Site includes the Maywood Interim Storage Site (MISS), the Ballod property, the Scanel site, residential properties, and the Sears warehouse and its adjacent properties, all of which are located in the towns of Maywood and Rochelle Park of Bergen County, New Jersey. These sites are at different investigative or remediation stages under the auspices of both the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE). The EPA is responsible for chemical characterization and cleanup operations, whereas the DOE is primarily in charge of radiologic analysis and remediation. On the basis of the information reviewed, ATSDR and NJDOH have concluded that the Maywood Chemical site is of public health concern because humans have probably been exposed to hazardous substances at concentrations that may result in adverse health effects. As noted in the Environmental Contamination and Physical Hazards section above, human exposure to chemical and radiological contamination is probably occurring and has probably occurred in the past via the use of contaminated groundwater and contact with contaminated soils. Before suspected areas of contamination are developed, both on-site contamination and the potential off-site migration of contaminants need to be fully evaluated. Developing an area, without characterizing potential contamination could lead to an adverse impact on the public health

  20. Health assessment for Peoples Natural Gas Company, Dubuque, Dubuque County, Iowa, Region 7. CERCLIS No. IAD980852578. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The Peoples Natural Gas Company site is a National Priorities List (NPL) site situated at 11th Street and Cedar Street in Dubuque, Iowa. The site is located at the former coal gas manufacturing plant located about 1,500 feet east of downtown Dubuque in an industrial zone area. Two waste products of primary concern are coal tar sludge and spent iron oxide waste. The population at risk of exposure includes 75 municipal employees in the Dubuque Public Works Garage, remedial workers, highway construction workers, and the general public at the site. Three schools are in the downtown area. Five commercial wells used in a cooling process are within half a mile of the site. The city of Dubuque has nine municipal wells 1.5 miles upgradient of the site. Potential human exposure routes include accidental ingestion and dermal contact with contaminated soil, inhalation of volatile organic compounds (VOCs) and contaminated dust, ingestion and dermal contact with contaminated ground water, and inhalation of VOCs from secondary industrial use of ground water. This site is a public health hazard because of potential for exposure to contaminants at concentrations that may result in adverse health effects

  1. EPA Region 10 Climate Change and TMDL Pilot – South Fork Nooksack River, Washington Final Report

    Science.gov (United States)

    This final report provides an overarching summary of the pilot research project, including the methods used in and the findings of the quantitative and qualitative assessments. It is written to appeal to a wide audience of policy makers, managers, agency staff and the general pub...

  2. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  3. Oldman River Dam wildlife habitat mitigation program, Pincher Creek, Alberta: Final report. Summary of the implementation phase, 1987--1993

    International Nuclear Information System (INIS)

    1998-01-01

    This article summarizes the 1987--1993 implementation phase of the Oldman River Dam Wildlife Habitat Mitigation Program, intended to offset the negative impact of dam construction and operation on plant and animal species. Projects carried out during the program included creation of wetlands, tree and shrub planting, installation of snow and wildlife fences, and installation of replacement nesting sites for birds. Summaries are provided of the process that led to the final program design, the projects undertaken to complete the program, the design strategies, and the proposed habitat mitigation projects. Also included are an inventory of completed projects, an evaluation of the program's success in meeting its objectives and of the mitigation techniques used in the program, and a recommended strategy for future management of the program. Appendices include habitat suitability index models, summaries of related reports, vegetation maps, and a grazing management plan

  4. Upstream passage, spawning, and stock identification of fall chinook in the Snake River, 1992 and 1993. Final report

    International Nuclear Information System (INIS)

    Blankenship, H.L.; Mendel, G.W.

    1997-05-01

    This final report of the 3-year study summarizes activities and results for 1993. Study objectives were to: (1) determine the source of losses (or accounting errors) for adult chinook salmon between Ice Harbor Dam (IHR) and Lower Granite Dam (LGR), and upstream of LGR in the Snake River; (2) identify spawning locations upstream of LGR for calibration of aerial redd surveys, redd habitat mapping, carcass recovery for genetic stock profile analysis, and correction of estimated adult/redd ratios; and (3) estimate passage and migration times at Snake River. 200 fall chinook salmon were radio tagged and tracked with aerial, fixed-site, and ground mobile tracking. Fish were released upstream of IHR at Charbonneau Park (CHAR). 190 of the fish were tracked or relocated away from CHAR. 59 fish descended to below IHR without crossing Lower Monumental Dam (LMO). Another 128 salmon passed upstream of LMO without falling back at IHR. Only 80 salmon passed Little Goose Dam (LGO) without falling back at a downstream dam; 66 of these fish passed LGR. Many fish that fell back reascended the dams. A total of 72 salmon released at CHAR passed upstream of LGR, including fish that had fallen back and reascended a dam. Over 80 percent of the salmon that entered Lyons Ferry Hatchery each year had reached LGO before descending to the hatchery. Extensive wandering was documented between LMO and upstream of LGR before salmon entered Lyons Ferry Hatchery or the Tucannon River. In 1993, 41 salmon were found to be of hatchery origin when recovered. These fish entered Lyons Ferry Hatchery with similar movements to unmarked salmon. Each year a few salmon have remained near the hatchery without entering, which suggests the hatchery may have inadequate attraction flows. Fall chinook passed lower Snake River dams in 2-5 days each on average. Median travel times through LMO and LGO were 1.0-1.3 days each, which was slower than for spring chinook or steelhead in 1993. 5 refs., 21 figs., 20 tabs

  5. Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-04-14

    The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. Options to treat, package, and store this material are discussed. The material included in this EIS consists of approximately 68 metric tons heavy metal (MTHM) of spent nuclear fuel 20 MTHM of aluminum-based spent nuclear fuel at SRS, as much as 28 MTHM of aluminum-clad spent nuclear fuel from foreign and domestic research reactors to be shipped to SRS through 2035, and 20 MTHM of stainless-steel or zirconium-clad spent nuclear fuel and some Americium/Curium Targets stored at SRS. Alternatives considered in this EIS encompass a range of new packaging, new processing, and conventional processing technologies, as well as the No Action Alternative. A preferred alternative is identified in which DOE would prepare about 97% by volume (about 60% by mass) of the aluminum-based fuel for disposition using a melt and dilute treatment process. The remaining 3% by volume (about 40% by mass) would be managed using chemical separation. Impacts are assessed primarily in the areas of water resources, air resources, public and worker health, waste management, socioeconomic, and cumulative impacts.

  6. Aerial gamma ray and magnetic survey: Powder River II Project, Ekalaka Quadrangle, Montana. Final report

    International Nuclear Information System (INIS)

    1979-04-01

    The Ekalaka quadrangle in southeastern Montana and western North and South Dakota, lies on the border between the Powder River and Williston Basins. These two basins are divided by the northwest-striking Miles City Arch. Each of the basins contains a thick sequence of Paleozoic and Mesozoic strata, with early to middle Tertiary rocks covering over 70% of the surface. No rocks older than Lower Cretaceous appear to be exposed. Magnetic data illustrate the relative depth to basement Precambrian crystalline rocks and clearly define the position of the Miles City Arch. The Ekalaka quadrangle has apparently been unproductive in terms of uranium mining though some claims (prospects) are present. These claims are located primarily in the Cretaceous Hell Creek Formation, and the Tertiary Fort Union Formation. A total of 176 groups of sample responses in the uranium window constitute anomalies as defined in Volume I. These anomalies are found most frequently in the Fort Union Formation, but several Cretaceous units have a large number of anomalies associated with their mapped locations. Few of these anomalies occur over known uranium claims or areas where material other than uranium is mined. Most of the anomalies probably relate to natural geologic features

  7. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  8. Study of a conceptual nuclear energy center at Green River, Utah. Final summary report

    Energy Technology Data Exchange (ETDEWEB)

    Williams, J.T. (ed.)

    1982-09-01

    This document summarizes a conceptual study on the feasibility and practicality of developing a nuclear energy center (NEC) at a representative Western site. The site selected for this conceptual study, an area of about 50 square miles, is located 15 miles south of Green River, Utah. The conceptual NEC would consist of nine nuclear electric generating units, arranged on the site in three clusters of three reactors each (triads), separated by about 2 1/2 miles. Of the total electric output of 11,250 MWe that the NEC could produce, about 82% is assumed to be transmitted out of Utah to Colorado, New Mexico, Arizona, Nevada, and California. The technical engineering issues studied included geology and seismology, plant design, low-level radioactive waste disposal, transmission, and construction schedules and costs. Socioeconomic issues included were demographics, land use, community service needs, and fiscal impacts. Environmental considerations included terrestrial and aquatic ecology, visual impact, and secondary population impacts. Radiological issues were concerned with the safety and risks of an NEC and an on-site low-level waste facility. Institutional issues included methods of ownership, taxation, implications of energy export, and water allocation. The basic finding was that an NEC would be technically feasible, but a number of socioeconomic and institutional issues would require resolution before a Western regional NEC could be considered a viable power plant siting option.

  9. Study of a conceptual nuclear energy center at Green River, Utah. Final summary report

    International Nuclear Information System (INIS)

    Williams, J.T.

    1982-09-01

    This document summarizes a conceptual study on the feasibility and practicality of developing a nuclear energy center (NEC) at a representative Western site. The site selected for this conceptual study, an area of about 50 square miles, is located 15 miles south of Green River, Utah. The conceptual NEC would consist of nine nuclear electric generating units, arranged on the site in three clusters of three reactors each (triads), separated by about 2 1/2 miles. Of the total electric output of 11,250 MWe that the NEC could produce, about 82% is assumed to be transmitted out of Utah to Colorado, New Mexico, Arizona, Nevada, and California. The technical engineering issues studied included geology and seismology, plant design, low-level radioactive waste disposal, transmission, and construction schedules and costs. Socioeconomic issues included were demographics, land use, community service needs, and fiscal impacts. Environmental considerations included terrestrial and aquatic ecology, visual impact, and secondary population impacts. Radiological issues were concerned with the safety and risks of an NEC and an on-site low-level waste facility. Institutional issues included methods of ownership, taxation, implications of energy export, and water allocation. The basic finding was that an NEC would be technically feasible, but a number of socioeconomic and institutional issues would require resolution before a Western regional NEC could be considered a viable power plant siting option

  10. Aerial gamma ray and magnetic survey: Powder River II Project, Newcastle Quadrangle, Wyoming. Final report

    International Nuclear Information System (INIS)

    1979-04-01

    Thick Phanerozoic sediments (greater than 17,000 ft) fill the northwest trending Powder River Basin which is the dominant tectonic structure in the Newcastle quadrangle. Lower Tertiary sediments comprise more than 85% of exposed units at the surface of the Basin. A small portion of the Black Hills Uplift occupies the eastern edge of the quadrangle. Residual magnetics clearly reflect the great depth to crystalline Precambrian basement in the Basin. The Basin/Uplift boundary is not readily observed in the magnetic data. Economic uranium deposits of roll-type configuration are present in the southwest within the Monument Hill-Box Creek District in fluvial sandstones of the Paleocene Fort Union Formation. Numerous small claims and prospects are found in the Pumpkin Buttes-Turnercrest District in the northwest. Interpretation of the radiometric data resulted in 86 statistical uranium anomalies listed for this quadrangle. Most anomalies are in the eastern-central portion of the map within Tertiary Fort Union and Wasatch Formations. However, several lie in the known uranium districts in the southwest and northwest

  11. Defense Waste Processing Facility: Savannah River Plant, Aiken, SC. Final environmental impact statement

    International Nuclear Information System (INIS)

    1982-02-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into both the selection of an appropriate strategy for the permanent disposal of the high-level radioactive waste (HLW) currently stored at the Savannah River Plant (SRP) and the subsequent decision to construct and operate a Defense Waste Processing Facility (DWPF) at the SRP site. The SRP is a major US Department of Envgy (DOE) installation for the production of nuclear materials for national defense. Approximately 83 x 10 3 m 3 (22 million gal) of HLW currently are stored in tanks at the SRP site. The proposed DWPF would process the liquid HLW generated by SRP operations into a stable form for ultimate disposal. This EIS assesses the effects of the proposed immobilization project on land use, air quality, water quality, ecological systems, health risk, cultural resources, endangered species, wetlands protection, resource depletion, and regional social and economic systems. The radiological and nonradiological risks of transporting the immobilized wastes are assessed. The environmental impacts of disposal alternatives have recently been evaluated in a previous EIS and are therefore only summarized in this EIS

  12. Columbia River Stock Identification Study; Validation of Genetic Method, 1980-1981 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Milner, George B.; Teel, David J.; Utter, Fred M. (Northwest and Alaska Fisheries Science Center, Coastal Zone and Estuarine Studies Division, Seattle, WA)

    1981-06-01

    The reliability of a method for obtaining maximum likelihood estimate of component stocks in mixed populations of salmonids through the frequency of genetic variants in a mixed population and in potentially contributing stocks was tested in 1980. A data base of 10 polymorphic loci from 14 hatchery stocks of spring chinook salmon of the Columbia River was used to estimate proportions of these stocks in four different blind'' mixtures whose true composition was only revealed subsequent to obtaining estimates. The accuracy and precision of these blind tests have validated the genetic method as a valuable means for identifying components of stock mixtures. Properties of the genetic method were further examined by simulation studies using the pooled data of the four blind tests as a mixed fishery. Replicated tests with samples sizes between 100 and 1,000 indicated that actual standard deviations on estimated contributions were consistently lower than calculated standard deviations; this difference diminished as sample size increased. It is recommended that future applications of the method be preceded by simulation studies that will identify appropriate levels of sampling required for acceptable levels of accuracy and precision. Variables in such studies include the stocks involved, the loci used, and the genetic differentiation among stocks. 8 refs., 6 figs., 4 tabs.

  13. Automated prediction of boundary layer winds and turbulence for the Savannah River Laboratory. Final report

    International Nuclear Information System (INIS)

    Gilhousen, D.B.

    1979-01-01

    Objective forecasts of many weather elements produced twice daily for about 230 US cities are made by applying the Model Output Statistics (MOS) technique (Glahn and Lowry, 1972). This technique relates by a statistical method the output of numerical models interpolated to a location (predictors) to a corresponding sample of observed local weather at that location (predictand). This study describes the development and testing of MOS wind forecasts for an instrumented TV tower located near the Savannah River Laboratory (SRL). If shown to be useful, these forecasts could serve as valuable guidance in case of a nuclear incident at the installation. This study introduces several new applications of the MOS technique. In addition to forecasts of wind speed and direction, forecasts of two turbulence parameters were developed and evaluated. These turbulence parameters were the standard deviations of both the azimuth and elevation of the wind. These quantities help to estimate the amount of plume and puff spread. Forecasts of all these elements were produced for several levels on the 335 m WJBF-TV tower. Tests were conducted to see if MOS forecasts of each element were capable of resolving differences between tower levels. MOS forecasts were compared to two other types of forecasts to determine their utility. Short range persistence forecasts served as one type of comparison since SRL uses the current observed winds in their diffusion models. Climatology forecasts served as the other comparison set

  14. Superfund record of decision (EPA Region 6): Oklahoma Refining Company, Cyril, OK. (First remedial action), June 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 160-acre Oklahoma Refining site is a petroleum refinery located on the eastern edge of Cyril, Oklahoma, in Caddo County. The facility included refinery process areas, bulk storage tanks, waste pits, wastewater treatment ponds, and a land treatment area. During the mid-1980's, EPA investigations revealed large-scale organic and heavy metal contamination of onsite soil and ground water. In 1990, EPA conducted a removal action, which included characterization and removal of drums, plugging wells, and wildlife protection measures. The ROD addresses the remediation of onsite contaminated soil, sediment, surface water, and ground water as a final remedy. The primary contaminants of concern affecting the soil, sediment, ground water, and surface water are VOCs, including benzene, toluene, and xylenes; other organics, including PAHs and phenols; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  15. Allocation of petroleum feedstock: Baltimore Gas and Electric Company, Sollers Point SNG Plant, Sollers Point, Baltimore County, Maryland. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    Liverman, James L.

    1978-04-01

    An allocation of naphtha feedstock up to 2,186,000 barrels per year to Baltimore Gas and Electric Company (BG and E) to operate its synthetic natural gas (SNG) facility is being considered. The allocation would enable BG and E to produce 10,800,000 mcf of SNG during a 180 day period. Operation of the plant at design capacity is expected to result in annual pollution emissions as follows: 626.4 tons of sulfur oxides, 168.5 tons of nitrogen oxides and 21.6 tons of particulate matter. Incremental emissions due to plant operations relative to existing emissions in Baltimore County are less than 1%. All Federal and State air quality standards should be met. Treated effluent is to be discharged into the Patapasco River where the environmental impacts are not expected to be significant. The SNG facility has been designed to be in compliance with all applicable Federal, State and local effluent standards. Water consumption requirements of 335,000 gallons per day are not expected to significantly tax the area's water resources. Sound generated by the SNG facility will be inaudible or imperceptible. All other operational impacts on land use, population, visual quality, roadways, community facilities and services and ecological systems were judged to be minimal. Environmental impacts resulting from various alternatives ranging from full allocation through denial of an allocation are discussed.

  16. Water chemistry and radiation buildup at the Commonwealth Edison Company LaSalle-1 BWR. Final report

    International Nuclear Information System (INIS)

    Earls, C.E.; Blok, J.

    1986-09-01

    This report presents the results of a comprehensive study of the water quality and radiation buildup at the LaSalle County Unit 2 boiling warer reactor (BWR). The purpose of the study was to determine the effect of corrosion product inputs from the forward pumped heater drains on overall water quality. Since the drains are pumped into the feedwater line without filtration or demineralization, corrosion products in these streams will directly add to the impurity levels of the final feedwater. At LaSalle, the forward pumped heater drains contributed less to the feedwater impurities, on average, than the effluent of the condensate demineralizer. The feedwater quality at LaSalle was generally in the ''acceptable'' range. Nevertheless, significant water chemistry improvements, especially in reducing the corrosion product spikes associated with power or flow transients, is highly desirable for this plant. Such improvements should begin with a more consistent quality of demineralizer operation. Quantitative gamma scans of the primary system piping at LaSalle 2 were carried out in the course of the water chemistry study. Although the cumulative operational exposure of the plant was relatively limited at the time this study was carried out, the radiation buildup rate did appear to be rapid (in fact, among the most rapid) compared to other similar BWRs

  17. Alligator Rivers Analogue project. Hydrogeological field studies. Final Report - Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S N [Univ of Arizona, Tucson, Arizona (United States). Dept of Hydrology and Water Resources; Marley, R D [D.B. Stephens and Associates Inc., Albuquerque, NM (United States); Norris, J R [Hydro Geo Chem Inc., Tucson, Arizona (United States)

    1993-12-31

    The hydrogeology of the Koongarra site was interpreted primarily from long-term hydrographs, water-level maps, water injection tests, aquifer pumping tests, logs of boreholes, and chemical analyses of groundwater samples. Data have been collected over a 21-year period starting with test-drilling in 1970. The first intensive period of hydrogeologic investigations was from 1978 through 1981 and was related to anticipated exploitation of uranium ore at Koongarra. The second period was from 1986 through 1991 and was related to the international Alligator Rivers Analogue Project under the direction of the Australian Nuclear Science and Technology Organisation. The conclusion which can be drawn from the chemical data is that water moving out of the No. 1 ore deposit is diluted rapidly with recharge from the surface as it migrates down the hydraulic gradient. Most of the groundwater outside of the ore deposit does not originate from the ore deposit, and flow models which assume unmodified stream tubes extending out of the ore deposit in a downgradient direction do not reflect the true system. Water in the ore deposit itself, must come from slow upward seepage through the fault zone. Owing to the fact that this water must be at least hundreds of years old, observed fluctuations of water levels in the deposit must reflect pressure head variations induced by seasonal recharge to the overlying surficial materials. Water level fluctuations do not signify a yearly displacement of water deep in the system. Water in the deeper part of the ore must be almost static compared to obvious rapid groundwater circulation in the area around PH88. Small changes in pH, temperature and specific electrical conductivity during aquifer tests indicate a complex hydraulic system which has a variable response to pumping as a function of time. Low concentration in tritium and Carbon-14 together with high concentrations of dissolved helium in the groundwaters all suggested strongly that semi static

  18. Alligator Rivers Analogue project. Hydrogeological field studies. Final Report - Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S.N. [Univ of Arizona, Tucson, Arizona (United States). Dept of Hydrology and Water Resources; Marley, R.D. [D.B. Stephens and Associates Inc., Albuquerque, NM (United States); Norris, J.R. [Hydro Geo Chem Inc., Tucson, Arizona (United States)

    1992-12-31

    The hydrogeology of the Koongarra site was interpreted primarily from long-term hydrographs, water-level maps, water injection tests, aquifer pumping tests, logs of boreholes, and chemical analyses of groundwater samples. Data have been collected over a 21-year period starting with test-drilling in 1970. The first intensive period of hydrogeologic investigations was from 1978 through 1981 and was related to anticipated exploitation of uranium ore at Koongarra. The second period was from 1986 through 1991 and was related to the international Alligator Rivers Analogue Project under the direction of the Australian Nuclear Science and Technology Organisation. The conclusion which can be drawn from the chemical data is that water moving out of the No. 1 ore deposit is diluted rapidly with recharge from the surface as it migrates down the hydraulic gradient. Most of the groundwater outside of the ore deposit does not originate from the ore deposit, and flow models which assume unmodified stream tubes extending out of the ore deposit in a downgradient direction do not reflect the true system. Water in the ore deposit itself, must come from slow upward seepage through the fault zone. Owing to the fact that this water must be at least hundreds of years old, observed fluctuations of water levels in the deposit must reflect pressure head variations induced by seasonal recharge to the overlying surficial materials. Water level fluctuations do not signify a yearly displacement of water deep in the system. Water in the deeper part of the ore must be almost static compared to obvious rapid groundwater circulation in the area around PH88. Small changes in pH, temperature and specific electrical conductivity during aquifer tests indicate a complex hydraulic system which has a variable response to pumping as a function of time. Low concentration in tritium and Carbon-14 together with high concentrations of dissolved helium in the groundwaters all suggested strongly that semi static

  19. Westinghouse Savannah River Company: Report from the DOE Voluntary Protection Program onsite reviews, February 24--March 7, 1997, and June 15--19, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Initial and Update Review Teams` findings from the onsite evaluations of the Westinghouse Savannah River Site (SRS), conducted February 24--March 7, 1997, and June 15-19, 1998. The site was evaluated against the program requirements contained in US Department of Energy Voluntary Protection Program, Part 1: Program Elements to determine its success in implementing the five tenets of DOE-VPP. The Initial Review Team concluded that WSRC met or surpassed all DOE-VPP requirements, with the exception of 12 minor findings and 5 recommendations. WSRC was asked to resolve the findings within 90 days. During a follow-up visit in January 1996, representatives of the Team verified that all 90-day actions were completed. The Update Team detected though that the program did not demonstrate thorough and meaningful employee involvement. The ability to attain and sustain VPP-level performance on employee involvement is a significant challenge. Large companies with multiple layers of management and geographically disperse personnel have particular difficulty.

  20. Westinghouse Savannah River Company: Report from the DOE Voluntary Protection Program onsite reviews, February 24-March 7, 1997, and June 15-19, 1998

    International Nuclear Information System (INIS)

    1999-05-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Initial and Update Review Teams' findings from the onsite evaluations of the Westinghouse Savannah River Site (SRS), conducted February 24--March 7, 1997, and June 15-19, 1998. The site was evaluated against the program requirements contained in US Department of Energy Voluntary Protection Program, Part 1: Program Elements to determine its success in implementing the five tenets of DOE-VPP. The Initial Review Team concluded that WSRC met or surpassed all DOE-VPP requirements, with the exception of 12 minor findings and 5 recommendations. WSRC was asked to resolve the findings within 90 days. During a follow-up visit in January 1996, representatives of the Team verified that all 90-day actions were completed. The Update Team detected though that the program did not demonstrate thorough and meaningful employee involvement. The ability to attain and sustain VPP-level performance on employee involvement is a significant challenge. Large companies with multiple layers of management and geographically disperse personnel have particular difficulty

  1. Quantification of the probable effects of alternative in-river harvest regulations on recovery of Snake River fall chinook salmon. Final report

    International Nuclear Information System (INIS)

    Cramer, S.P.; Vigg, S.

    1996-03-01

    The goal of this study was to quantify the probable effects that alternative strategies for managing in-river harvest would have on recovery of Snake River fall chinook salmon. This report presents the analysis of existing data to quantify the way in which various in-river harvest strategies catch Snake River bright (SRB) fall chinook. Because there has been disagreement among experts regarding the magnitude of in-river harvest impacts on Snake River fall chinook, the authors compared the results from using the following three different methods to estimate in-river harvest rates: (1) use of run reconstruction through stock accounting of escapement and landings data to estimate harvest rate of SRB chinook in Zone 6 alone; (2) use of Coded Wire Tag (CWT) recoveries of fall chinook from Lyons Ferry Hatchery in a cohort analysis to estimate age and sex specific harvest rates for Zone 6 and for below Bonneville Dam; (3) comparison of harvest rates estimated for SRB chinook by the above methods to those estimated by the same methods for Upriver Bright (URB) fall chinook

  2. The relationship between survival of Columbia River fall chinook salmon and in-river environmental factors -- Analysis of historic data for juvenile and adult salmonid production: Phase 2. Final report

    International Nuclear Information System (INIS)

    Skalski, J.R.; Townsend, R.L.; Donnelly, R.F.; Hilborn, R.W.

    1996-12-01

    This project analyzes in greater detail the coded-wire-tag (CWT) returns of Priest Rapids Hatchery fall chinook for the years 1976--1989 initially begun by Hilborn et al. (1993a). These additional analyses were prompted by suggestions made by peer reviews of the initial draft report. The initial draft and the peer review comments are included in this final report (Appendices A and B). The statistical analyses paired Priest Rapids stock with potential downriver reference stocks to isolate in-river survival rates. Thirty-three potential reference stocks were initially examined for similar ocean recovery rates; the five stocks with the most similar recovery patterns (i.e., Bonneville Brights, Cowlitz, Gray's River, Tanner Creek, and Washougal) to the Priest Rapids stock were used in the subsequent analysis of in-river survival. Three alternate forms of multiple regression models were used to investigate the relationship between predicted in-river survival and ambient conditions. Analyses were conducted with and without attempts to adjust for smolt transportation at McNary Dam. Independent variables examined in the analysis included river flows, temperature, turbidity, and spill along with the total biomass of hatchery releases in the Columbia-Snake River Basin

  3. Construction and operation of a tritium extraction facility at the Savannah River Site. Final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium. This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium Supply and Recycling, from which DOE determined that it would produce tritium either in an accelerator or in a commercial light water reactor. The purpose of the proposed action and alternatives evaluated in this EIS is to provide tritium extraction capability to support either tritium production technology. The EIS assesses the environmental impacts from the proposed action and the alternatives, including the no action alternative

  4. IBRD sonar scour monitoring project : real-time river channel-bed monitoring at the Chariton and Mississippi Rivers in Missouri, 2007-09, final report, January 2010.

    Science.gov (United States)

    2010-01-01

    Scour and depositional responses to hydrologic events have been important to the scientific community studying sediment transport as well as potential effects on bridges and other hydraulic structures within riverine systems. A river channel-bed moni...

  5. The pollution history of the Savannah River Estuary. Final report 1 Sep 1976--31 Dec 1977

    International Nuclear Information System (INIS)

    Goldberg, E.D.; Griffin, J.J.; Hodge, V.; Koide, M.

    1978-06-01

    Records of natural and pollutant fluxes to the Savannah River Estuary are found in some river and marsh deposits into which time frames can be introduced by 210 Pb or plutonium geochronologies. Plutonium releases from the Savannah River Plant are evident in only one deposit and in marsh grass which received the transuranic element from atmospheric transport. The pollution records can be disturbed by bioturbative activities of organisms, by the input of marine solid phases to the estuarine deposits, and by river scour and fill

  6. Final Environmental Statement related to the operation of Wolf Creek Generating Station, Unit No. 1. Docket No. STN 50-482, Kansas Gas and Electric Company, et al

    International Nuclear Information System (INIS)

    1982-06-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Wolf Creek Generating Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and bridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to the Neosho River are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for the Wolf Creek Generating Station Unit 1

  7. Columbia River White Sturgeon Genetics and Early Life History: Population Segregation and Juvenile Feeding Behavior, 1987 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Brannon, Ernest L.

    1988-06-01

    The geographic area of the genetics study broadly covered the distribution range of sturgeon in the Columbia from below Bonneville Dam at Ilwaco at Lake Roosevelt, the Upper Snake River, and the Kootenai River. The two remote river sections provided data important for enhancement considerations. There was little electrophoretic variation seen among individuals from the Kootenai River. Upper Snake river sturgeon showed a higher percentage of polymorphic loci than the Kootenai fish, but lower than the other areas in the Columbia River we sampled. Sample size was increased in both Lake Roosevelt and at Electrophoretic variation was specific to an individual sampling area in several cases and this shaped our conclusions. The 1987 early life history studies concentrated on the feeding behavior of juvenile sturgeon. The chemostimulant components in prey attractive to sturgeon were examined, and the sensory systems utilized by foraging sturgeon were determined under different environmental conditions. These results were discussed with regard to the environmental changes that have occurred in the Columbia River. Under present river conditions, the feeding mechanism of sturgeon is more restricted to certain prey types, and their feeding range may be limited. In these situations, enhancement measures cannot be undertaken without consideration given to the introduction of food resources that will be readily available under present conditions. 89 refs., 7 figs., 11 tabs.

  8. Hydraulic Characteristics of the Lower Snake River during Periods of Juvenile Fall Chinook Salmon Migration, 2002-2006 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Cook, C.; Dibrani, B.; Richmond, M.; Bleich, M.; Titzler, P..; Fu, T. [Pacific Northwest National Laboratory

    2006-01-01

    This report documents a four-year study to assess hydraulic conditions in the lower Snake River. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by the Pacific Northwest National Laboratory. Cold water released from the Dworshak Reservoir hypolimnion during mid- to late-summer months cools the Clearwater River far below equilibrium temperature. The volume of released cold water augments the Clearwater River, and the combined total discharge is on the order of the Snake River discharge when the two rivers meet at their confluence near the upstream edge of Lower Granite Reservoir. With typical temperature differences between the Clearwater and Snake rivers of 10 C or more during July and August, the density difference between the two rivers during summer flow augmentation periods is sufficient to stratify Lower Granite Reservoir as well as the other three reservoirs downstream. Because cooling of the river is desirable for migrating juvenile fall Chinook salmon (Oncorhynchus tshawytscha) during this same time period, the amount of mixing and cold water entrained into Lower Granite Reservoir's epilimnion at the Clearwater/Snake River confluence is of key biological importance. Data collected during this project indicates the three reservoirs downstream of Lower Granite also stratify as direct result of flow augmentation from Dworshak Reservoir. These four reservoirs are also heavily influenced by wind forcing at the water's surface and during periods of low river discharge often behave like a two-layer lake. During these periods of stratification, lower river discharge, and wind forcing, the water in the upper layer of the reservoir is held in place or moves slightly upstream. This upper layer is also exposed to surface heating and may warm up to temperatures close to equilibrium temperature. The thickness (depth) of this upper warm layer and its direction of travel may be of key biological importance to juvenile

  9. Minnesota River at Chaska, Minnesota. Technical Appendixes. Limited Reevaluation Report and Final Supplement to the Final Environmental Impact Statement for Flood Control and Related Purposes.

    Science.gov (United States)

    1982-08-01

    June 12, 1980. 0 rganochlorine and organophosphorus insecticides , PC B’s, and PC N’s were not detected in the sample. 2,4-D was the only chlorinated...within the floodplain of the Minnesota River and is vegetated with silver maple, cottonwood, willow and elm with scattered nettle , jewelweed and grasses...generally leaf litter and plant debris with heavy growth of nettle . The location of the Chaska Lake Unit is ideal for wildlife interpretation. Wildlife

  10. The cycling of transuranic radionuclides in the Columbia River, its estuary and the northeast Pacific Ocean: Final report

    International Nuclear Information System (INIS)

    Beasley, T.M.

    1987-01-01

    This review summarizes work during 1985 to 1986 on the radioecology of plutonium, americium and cesium in the Columbia River sediments; radionuclide kinetics of technetium in fish, and radioactivity in the Pacific Ocean

  11. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

  12. Program GICC - AQUABIO. Possible consequences of the climatic change on the aquatic and river french biocenoses. Final report

    International Nuclear Information System (INIS)

    Pont, D.

    2003-11-01

    The consequences of the climatic change can modify the ecosystems. The aim of this research program is to analyze the impacts of the climatic change on the propagation of the exotic species in France in aquatic and river environment, the population of macro invertebrates and fishes in the french rivers and the socio economic challenges. The methodology is based on the simulation from the exploitation of great data bases and the combination of many approaches at different scales. (A.L.B.)

  13. Application of wind power systems to the Service Area of the Minnesota Power and Light Company. Final report, July 1975--August 1976

    Energy Technology Data Exchange (ETDEWEB)

    Lindquist, O.H.; Malver, F.S.

    1976-01-01

    Honeywell, in a joint effort with Minnesota Power and Light Company (MP and L), Boeing Vertol Company, and Dr. C.G. Justus, Georgia Institute of Technology, has conducted a regional application study of wind energy systems. Minnesota Power and Light Company, an investor-owned company with 853-MW owned capacity, has served as the case study subject utility. An initial system definition was developed based on available wind information and near-term wind turbine generator (WTG) technology. The system was tailored to fit MP and L's forecasted generation needs and the company's existing transmission and distribution system. Honeywell developed a WECS simulation to convert wind data to wind energy available for input to the utility's grid. The simulation was used to evaluate the performance of preliminary design wind turbine generators developed for ERDA/NASA by the General Electric Company and Kaman Aerospace Corporation, and to evaluate the performance of a wind turbine optimized for the Northern Minnesota wind regime and developed by the Boeing Vertol Company under subcontract to Honeywell.

  14. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, M.L. [USDOE Albuquerque Operations Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office; Alkema, K. [Utah Dept. of Health, Salt Lake City, UT (United States). Environmental Health Div.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.

  15. The Reaches Project : Ecological and Geomorphic Dtudies Supporting Normative Flows in the Yakima River Basin, Washington, Final Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Stanford, Jack A.; Lorang, Mark N.; Matson, Phillip L. (University of Montana, Flathead Lake Biological Station, Poison, MT)

    2002-10-01

    The Yakima River system historically produced robust annual runs of chinook, sockeye, chum and coho salmon and steelhead. Many different stocks or life history types existed because the physiography of the basin is diverse, ranging from very dry and hot in the high desert of the lower basin to cold and wet in the Cascade Mountains of the headwaters (Snyder and Stanford 2001). Habitat diversity and life history diversity of salmonids are closely correlated in the Yakima Basin. Moreover, habitat diversity for salmonids and many other fishes maximizes in floodplain reaches of river systems (Ward and Stanford 1995, Independent Scientific Group 2000). The flood plains of Yakima River likely were extremely important for spawning and rearing of anadromous salmonids (Snyder and Stanford 2001). However, Yakima River flood plains are substantially degraded. Primary problems are: revetments that disconnect main and side channel habitats; dewatering associated with irrigation that changes base flow conditions and degrades the shallow-water food web; chemical and thermal pollution that prevents proper maturation of eggs and juveniles; and extensive gravel mining within the floodplain reaches that has severed groundwater-channel connectivity, increased thermal loading and increased opportunities for invasions of nonnative species. The Yakima River is too altered from its natural state to allow anything close to the historical abundance and diversity of anadromous fishes. Habitat loss, overharvest and dam and reservoir passage problems in the mainstem Columbia River downstream of the Yakima, coupled with ocean productivity variation, also are implicated in the loss of Yakima fisheries. Nonetheless, in an earlier analysis, Snyder and Stanford (2001) concluded that a significant amount of physical habitat remains in the five floodplain reaches of the mainstem river because habitat-structuring floods do still occur on the remaining expanses of floodplain environment. Assuming main

  16. Summary report for Bureau of Fisheries stream habitat surveys: Cowlitz River basin. Final report 1934--1942

    International Nuclear Information System (INIS)

    McIntosh, B.A.; Clark, S.E.; Sedell, J.R.

    1995-07-01

    This document contains summary reports of stream habitat surveys, conducted in the Cowlitz River basin, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1938--1942. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead. The purpose of the survey was to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949--1952 by the US Fish and Wildlife Service

  17. Analysis of the Evolution for the Main Economic and Financial Indicators and the Risk of Bankruptcy for a Company who is the most Modern Maritime - River Port on the Danube, in the Period 2009-2013

    Directory of Open Access Journals (Sweden)

    Rodica Pripoaie

    2015-08-01

    Full Text Available This work presents the evolution for the main economic and financial indicators and the risk of bankruptcy for a company who is the most modern maritime - river port on the Danube, in the period 2009-2013. The evolution of the main economic and financial indicators in the last years 2009- 2013 is very dramatic, because Net profit margin (% decreased from 65.76% in 2009 at 9.93% in 2013 and after tax ROE (Return on Equity decreased from 6.69% in 2009 at 2.93% in 2013, so less than half. Bankruptcy risk has always been very important both for investors, for company managers, and for banking institutions and if this intensifies then it becomes a warning for them. Regression models can be used to explain relationships among economic and financial indicators.

  18. Anacostia River fringe wetlands restoration project: final report for the five-year monitoring program (2003 through 2007)

    Science.gov (United States)

    Krafft, Cairn C.; Hammerschlag, Richard S.; Guntenspergen, Glenn R.

    2009-01-01

    The 6-hectare (ha) freshwater tidal Anacostia River Fringe Wetlands (Fringe Wetlands) were reconstructed along the mainstem of the Anacostia River in Washington, DC (Photograph 1, Figure 1) during the summer of 2003. The Fringe Wetlands consist of two separate planting cells. Fringe A, located adjacent to Lower Kingman Island, on the west bank of the Anacostia River, occupies 1.6 ha; Fringe B, located on the east bank of the Anacostia River, occupies 4.4 ha. This project is the third in a series of freshwater tidal wetland reconstructions on the Anacostia River designed and implemented by the US Army Corps of Engineers (USACE) Baltimore District and District Department of the Environment (DDOE) on lands managed by the National Park Service (NPS). The first was Kenilworth Marsh, reconstructed in 1993 (Syphax and Hammerschlag 2005); the second was Kingman Marsh, reconstructed in 2000 (Hammerschlag et al. 2006). Kenilworth and Kingman were both constructed in low-energy backwaters of the Anacostia. However, the Fringe Wetlands, which were constructed on two pre-existing benches along the high-energy mainstem, required sheet piling to provide protection from erosive impacts of increased flow and volume of water associated with storm events during the establishment phase (Photograph 2). All three projects required the placement of dredged sediment materials to increase elevations enough to support emergent vegetation (Photograph 3). The purpose of all three wetland reconstruction projects was to restore pieces of the once extensive tidal freshwater marsh habitat that bordered the Anacostia River historically, prior to the dredge and fill operations and sea wall installation that took place there in the early to mid-1900's (Photograph 4).

  19. Evaluation of Management of Water Releases for Painted Rocks Reservoir, Bitterroot River, Montana, 1983-1986, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Spoon, Ronald L. (Montana Department of Fish, Wildlife and Parks, Missoula, MT)

    1987-06-01

    This study was initiated in July, 1983 to develop a water management plan for the release of water purchased from Painted Rocks Reservoir. Releases were designed to provide optimum benefits to the Bitterroot River fishery. Fisheries, habitat, and stream flow information was gathered to evaluate the effectiveness of these supplemental releases in improving trout populations in the Bitterroot River. The study was part of the Northwest Power Planning Council's Fish and Wildlife Program and was funded by the Bonneville Power Administration. This report presents data collected from 1983 through 1986.

  20. Hood River Steelhead Genetics Study; Relative Reproductive Success of Hatchery and Wild Steelhead in the Hood River, Final Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Blouin, Michael

    2003-05-01

    There is a considerable interest in using hatcheries to speed the recovery of wild populations. The Bonneville Power Administration (BPA), under the authority of the Northwest Power Planning Act, is currently funding several hatchery programs in the Columbia Basin as off-site mitigation for impacts to salmon and steelhead caused by the Columbia River federal hydropower system. One such project is located on the Hood River, an Oregon tributary of the Columbia. These hatchery programs cost the region millions of dollars. However, whether such programs actually improve the status of wild fish remains untested. The goal of this project was to evaluate the effectiveness of the Hood River hatchery program as required by the Northwest Power Planning Council Fish and Wildlife Program, by the Oregon Plan for Coastal Salmonids, by NMFS ESA Section 4(d) rulings, and by the Oregon Department of Fish and Wildlife (ODFW) Wild Fish Management Policy (OAR 635-07-525 through 529) and the ODFW Hatchery Fish Gene Resource Management Policy (OAR 635-07-540 through 541). The Hood River supports two populations of steelhead, a summer run and a winter run. They spawn only above the Powerdale Dam, which is a complete barrier to all salmonids. Since 1991 every adult passed above the dam has been measured, cataloged and sampled for scales. Therefore, we have a DNA sample from every adult steelhead that went over the dam to potentially spawn in the Hood River from 1991 to the present. Similar numbers of hatchery and wild fish have been passed above the dam during the last decade. During the 1990's 'old' domesticated hatchery stocks of each run (multiple generations in the hatchery, out-of-basin origin; hereafter H{sub old}) were phased out, and conservation hatchery programs were started for the purpose of supplementing the two wild populations (hereafter 'new' hatchery stocks, H{sub new}). These samples gave us the unprecedented ability to estimate, via

  1. Survey of Artificial Production of Anadromous Salmonids in the Columbia River Basin, 1981-1985 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Washington, Percy M.

    1985-11-25

    The overall objective of this project is to collect, organize, and summarize data concerning anadromous fish culture stations of the Columbia River system for 1981, 1982, and 1983 and to create a data archive system with a means of making this information available to the public.

  2. Stock Assessment of Columbia River Anadromous Salmonids : Final Report, Volume I, Chinook, Coho, Chum and Sockeye Salmon Summaries.

    Energy Technology Data Exchange (ETDEWEB)

    Howell, Philip J.

    1986-07-01

    The purpose was to identify and characterize the wild and hatchery stocks of salmon and steelhead in the Columbia River Basin on the basis of currently available information. This report provides a comprehensive compilation of data on the status and life histories of Columbia Basin salmonid stocks.

  3. 78 FR 8582 - Final Environmental Impact Statement for Brooks River Visitor Access for Katmai National Park and...

    Science.gov (United States)

    2013-02-06

    ... River floating bridge and sites to relocate the existing Naknek Lake barge landing area at the mouth of... alternative would maintain seasonal use of the floating bridge, which is 8 feet wide and about 320 feet long... piles and would follow the alignment of the floating bridge. The bridge and boardwalk system would have...

  4. Proposed ground water protection strategy for the Uranium Mill Tailings Site at Green River, Utah. Final report

    International Nuclear Information System (INIS)

    1994-11-01

    This document presents the US DOE water resources protection strategy for the Green River, Utah mill tailings disposal site. The modifications in the original plan are based on new information, including ground water quality data collected after remedial action was completed, and on a revised assessment of disposal cell design features, surface conditions, and site hydrogeology. All aspects are discussed in this report

  5. Summary Report for Bureau of Fisheries Stream Habitat Surveys: Cowlitz River Basin, 1934-1942 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    McIntosh, Bruce A.; Clark, Sharon E.; Sedell, James R.

    1995-01-01

    This document contains summary reports of stream habitat surveys, conducted in the Cowlitz River basin, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1938-1942. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead. The purpose of the survey was, as described by Rich, [open quotes]to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes[close quotes]. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949-1952 by the U.S. Fish and Wildlife Service. The reports were brief, qualitative accounts of over 5000 miles of stream surveys conducted by the BOF from 1934-1946. Despite their brevity, these BOF reports have formed the basis for estimating fish habitat losses and conditions in the Columbia River Basin.

  6. WATER-QUALITY CONDITIONS DURING LOW FLOW IN THE LOWER YOUGHIOGHENY RIVER BASIN, PENNSYLVANIA, OCTOBER 5-7, 1998; FINAL

    International Nuclear Information System (INIS)

    James I. Sams, III, Karl T. Schroeder; Terry E. Ackman; J. Kent Crawford; Kim L. Otto

    2001-01-01

    In October 1998, a chemical synoptic survey was conducted by the U.S. Geological Survey, in cooperation with the U.S. Department of Energy, National Energy Technology Laboratory, in the Lower Youghiogheny River Basin in Pennsylvania to give a snap-shot of present (1998) water quality during low-flow conditions. Water samples from 38 sites-12 mainstem sites, 22 tributaries, and 4 mine discharges that discharge directly to the Youghiogheny River-were used to identify sources of contaminants from mining operations. Specific conductance, water temperature, pH, and dissolved oxygen were measured in the field at each site and concentrations of major ions and trace elements were measured in the laboratory. Unaccounted for gains and losses in streamflow were measured during the study. Unaccounted for losses in streamflow might be attributed to water loss through streambed fractures. Extensive mine tunnels are present in the basin and loss of water to these tunnels seems likely. Unaccounted for gains in streamflow may be from unmeasured tributaries or surface seeps, but most of the gains are suspected to come from artesian flow through fractures in the streambed from underground mine pools. Influent flows of rust-colored water were noted in some river sections. The pH values for all the samples collected during this survey were above 5.8, and most (33 of 38 samples) were above 7.0. Samples from the four mine-discharge sites also had pH values between 6.3 and 6.7. The lowest pH (5.8) was in a tributary, Galley Run. All 38 sampling sites had net alkalinity. The alkalinity load in the Youghiogheny River increased between Connellsville and McKeesport from 35 to 79 tons per day. Above Smithton, the measured alkalinity load in the Lower Youghiogheny River agreed well with the estimated alkalinity load. Below Smithton, measured alkalinity loads in the Lower Youghiogheny River are greater than calculated loads, resulting in unaccounted for gains in alkalinity. These gains are

  7. Smart Companies.

    Science.gov (United States)

    Galagan, Patricia A.

    1997-01-01

    Capturing and leveraging knowledge is an important new management trend that is as yet undefined. Some companies are accounting for their intellectual capital and applying it to the company balance sheets. (JOW)

  8. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  9. Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2011 - FINAL ANNUAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Sather, Nichole K.; Storch, Adam; Johnson, Gary E.; Teel, D. J.; Skalski, J. R.; Bryson, Amanda J.; Kaufmann, Ronald M.; Woodruff, Dana L.; Blaine, Jennifer; Kuligowski, D. R.; Kropp, Roy K.; Dawley, Earl M.

    2012-05-31

    The study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL), the Oregon Department of Fish and Wildlife (ODFW), the University of Washington (UW), and the National Marine Fisheries Service (NMFS) for the U.S. Army Corps of Engineers, Portland District (USACE). This research project was initiated in 2007 by the Bonneville Power Administration to investigate critical uncertainties regarding juvenile salmon ecology in shallow tidal freshwater habitats of the lower Columbia River. However, as part of the Washington Memorandum of Agreement, the project was transferred to the USACE in 2010. In transferring from BPA to the USACE, the focus of the tidal freshwater research project shifted from fundamental ecology toward the effectiveness of restoration in the Lower Columbia River and estuary (LCRE). The research is conducted within the Action Agencies Columbia Estuary Ecosystem Restoration Program (CEERP). Data reported herein spans the time period May 2010 to September 2011.

  10. Feasibility Report and Final Environmental Impact Statement, Wisconsin River at Portage, Wisconsin, Feasibility Study for Flood Control. Appendixes.

    Science.gov (United States)

    1983-12-01

    practical. A second option is to purchase floodplain property in fee, demolish existing floodprone structures, and reuse the land for agriculture or other...Aphanizomenon flos- aguae (a blue-green alga) and Cocconeis sp. (a pennate diatom). Station 1 had fewer species and fewer individuals than did Stations 2 and 3...algae were present in-each 7° river during the summer sampling period. Blue-green algae (Anabaena sp. and Aphanizomenon flos- aguae ) were the most abundant

  11. Aerial gamma ray and magnetic survey: Powder River R and D Project, Arminto Detail, Wyoming. Final report

    International Nuclear Information System (INIS)

    1979-05-01

    The small detail area, 18 miles by 18 miles, lying near the center of the Powder River Basin, is covered entirely by sediments of the Eocene Wasatch Formation. Historically economic uranium deposits have been worked in the southeast corner of the area which includes the northern extremity of the Pumpkin Buttes district. 127 statistical uranium anomalies were generated for the study area, based on area wide statistics

  12. Aerial gamma ray and magnetic survey: Minnesota Project, Thief River Falls quadrangle of Minnesota/North Dakota. Final report

    International Nuclear Information System (INIS)

    1979-11-01

    The Thief River Falls 1:250,000 scale quadrangle of Minnesota and North Dakota is almost everywhere covered with Wisconsin age glacial deposits (drift, lake sediments, etc.) of variable thickness. Where exposed, bedrock is Late Cretaceous age marine deposits. There are no uranium deposits (or occurrences) known within the quadrangle. Sixty-six groups of uranium samples were defined as anomalies and are discussed briefly. None of them are considered significant

  13. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  14. A report on developing a checklist to assess company plans focused on improving safety awareness, safe behaviour and safety culture: final report

    NARCIS (Netherlands)

    Steijger, N.; Starren, H.; Keus, M.; Gort, J.; Vervoort, M.

    2003-01-01

    This report describes the process of developing a checklist to asses company plans focused on improving safety awareness, safe behaviour and safety culture. These plans are part of a programme initiated by the Ministry of Social Affairs and Employment aiming at improving the safety performance of

  15. Summary Report for Bureau of Fisheries Stream Habitat Surveys : Yakima River Basin, 1934-1942, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    McIntosh, Bruce A.; Clark, Sharon E.; Sedell, James R.

    1996-01-01

    This document contains summary reports of stream habitat surveys, conducted in the Yakima River basin, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1934-1942. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead (Rich, 1948). The purpose of the survey was, as described by Rich, 'to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes'. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949-1952 by the U.S. Fish and Wildlife Service. The reports were brief, qualitative accounts of over 5000 miles of stream surveys conducted by the BOF from 1934-1946 (Bryant, 1949; Bryant and Parkhurst, 1950; Parkhurst, 1950a-c; Parkhurst et al., 1950). Despite their brevity, these BOF reports have formed the basis for estimating fish habitat losses and conditions in the Columbia River Basin (Fulton, 1968, 1970; Thompson, 1976; NPPC, 1986). Recently, the field notebooks from the BOF surveys were discovered. The data is now archived and stored in the Forest Science DataBank at Oregon State University (Stafford et al., 1984; 1988). These records are the earliest and most comprehensive documentation available of the condition and extent of anadromous fish habitat before hydropower development in the Columbia River Basin. They provide the baseline data for quantifying changes and setting a benchmark for future restoration of anadromous fish habitat throughout the Basin. The summaries in this book are exact replicates of the originals. Due to discrepancies between the field data and the summaries, the database should be used to assess pool and substrate conditions. This data is available from the Bonneville Power Administration

  16. Summary Report for Bureau of Fisheries Stream Habitat Surveys : Willamette River Basin, 1934-1942, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    McIntosh, Bruce A.; Clark, Sharon E.; Sedell, James R.

    1995-01-01

    This document contains summary reports of stream habitat-surveys, conducted in the Willamette River basin, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1934-1942. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead (Rich, 1948). The purpose of the survey was, as described by Rich, 'to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes'. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949-1952 by the U.S. Fish and Wildlife Service. The reports were brief, qualitative accounts of over 5000 miles of stream surveys conducted by the BOF from 1934-1946 (Bryant, 1949; Bryant and Parkhurst, 1950; Parkhurst, 1950a-c; Parkhurst et al., 1950). Despite their brevity, these BOF reports have formed the basis for estimating fish habitat losses and conditions in the Columbia River Basin (Fulton, 1968, 1970; Thompson, 1976; NPPC, 1986). Recently, the field notebooks from the BOF surveys were discovered. The data is now archived and stored in the Forest Science DataBank at Oregon State University (Stafford et al., 1984; 1988). These records are the earliest and most comprehensive documentation available of the condition and extent of anadromous fish habitat before hydropower development in the Columbia River Basin. They provide the baseline data for quantifying changes and setting a benchmark for future restoration of anadromous fish habitat throughout the Basin. The summaries contained in this book are exact replicates of the originals. Due to discrepancies between the field data and the summaries, the database should be used to assess pool and substrate conditions. This data is available from the Bonneville Power

  17. Analysis of district heating pricing in Finland from the customers' and energy companies perspectives. Final report; Kaukolaemmoen hinnoittelun nykytila ja tulevaisuuden mahdollisuudet. Loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Sarvaranta, A.; Jaaskelainen, J.; Puolakka, J.; Kouri, P. [AF-Consult, Vantaa (Finland)

    2012-12-15

    The heating market in Finland is changing. Until now, district heating demand has been constantly increasing. However, forecasts predict the demand to drop slightly in the future due to the increasing energy efficiency demands and development of competing heating technologies. Maintaining existing customer base may rise as one of the major challenges of a district heating company in the future. This report covers the topic 'Analysis of district heating pricing in Finland from the customers' and energy companies perspectives'. The report provides a general description of the current challenges and future opportunities of district heating pricing in Finland. Cost and pricing structures are discussed from both the companies and customers' perspectives. The overall objective is to provide an overview of the current state of district heating pricing in Finland and provide information on new pricing opportunities. The conclusions of the report provide information that district heating companies can use in developing their pricing system. Based on the literature and material analysed in this study, district heating pricing currently lacks adequate transparency and therefore should be developed to reflect the cost structure more closely. New metering technologies allow more accurate information on heat consumption and can hence be used to improve the transparency of pricing. Average marginal costs generally vary between seasons. If the goal is to reflect the cost structure taking into account the average variable costs, season dependent pricing becomes desirable. More variability in pricing between seasons may also keep customers from switching completely or partially into other heating systems, as the pricing becomes more cost-effective and easier to understand. Different types of customers wish for different properties in pricing: transparency, freedom of choice, convenience, more dynamic pricing, etc.. While expanding and tailoring the pricing

  18. Changes in water quality of the River Frome (UK) from 1965 to 2009: Is phosphorus mitigation finally working?

    Energy Technology Data Exchange (ETDEWEB)

    Bowes, M.J., E-mail: mibo@ceh.ac.uk [Centre for Ecology and Hydrology, Maclean Building, Crowmarsh Gifford, Wallingford, Oxfordshire, OX10 8BB (United Kingdom); Smith, J.T. [School of Earth and Environmental Sciences, Burnaby Building, University of Portsmouth, Portsmouth PO1 3QL (United Kingdom); Neal, C. [Centre for Ecology and Hydrology, Maclean Building, Crowmarsh Gifford, Wallingford, Oxfordshire, OX10 8BB (United Kingdom); Leach, D.V. [formally Centre for Ecology and Hydrology, Winfrith Technology Centre, Dorchester, Dorset, DT2 8ZD (United Kingdom); Scarlett, P.M.; Wickham, H.D.; Harman, S.A.; Armstrong, L.K. [Centre for Ecology and Hydrology, Maclean Building, Crowmarsh Gifford, Wallingford, Oxfordshire, OX10 8BB (United Kingdom); Davy-Bowker, J. [Freshwater Biological Association, River Laboratory, East Stoke, Wareham, Dorset, BH20 6BB (United Kingdom); Haft, M. [Freshwater Biological Association, Ferry Landing, Far Sawrey, Ambleside, Cumbria, LA22 0LP (United Kingdom); Davies, C.E. [Centre for Ecology and Hydrology, Maclean Building, Crowmarsh Gifford, Wallingford, Oxfordshire, OX10 8BB (United Kingdom)

    2011-08-15

    The water quality of the River Frome, Dorset, southern England, was monitored at weekly intervals from 1965 until 2009. Determinands included phosphorus, nitrogen, silicon, potassium, calcium, sodium, magnesium, pH, alkalinity and temperature. Nitrate-N concentrations increased from an annual average of 2.4 mg l{sup -1} in the mid to late 1960s to 6.0 mg l{sup -1} in 2008-2009, but the rate of increase was beginning to slow. Annual soluble reactive phosphorus (SRP) concentrations increased from 101 {mu}g l{sup -1} in the mid 1960s to a maximum of 190 {mu}g l{sup -1} in 1989. In 2002, there was a step reduction in SRP concentration (average = 88 {mu}g l{sup -1} in 2002-2005), with further improvement in 2007-2009 (average = 49 {mu}g l{sup -1}), due to the introduction of phosphorus stripping at sewage treatment works. Phosphorus and nitrate concentrations showed clear annual cycles, related to the timing of inputs from the catchment, and within-stream bioaccumulation and release. Annual depressions in silicon concentration each spring (due to diatom proliferation) reached a maximum between 1980 and 1991, (the period of maximum SRP concentration) indicating that algal biomass had increased within the river. The timing of these silicon depressions was closely related to temperature. Excess carbon dioxide partial pressures (EpCO{sub 2}) of 60 times atmospheric CO{sub 2} were also observed through the winter periods from 1980 to 1992, when phosphorus concentration was greatest, indicating very high respiration rates due to microbial decomposition of this enhanced biomass. Declining phosphorus concentrations since 2002 reduced productivity and algal biomass in the summer, and EpCO{sub 2} through the winter, indicating that sewage treatment improvements had improved riverine ecology. Algal blooms were limited by phosphorus, rather than silicon concentration. The value of long-term water quality data sets is discussed. The data from this monitoring programme are made

  19. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah

    International Nuclear Information System (INIS)

    Matthews, M.L.; Alkema, K.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement

  20. Final environmental impact statement, interim management of nuclear materials, Savannah River Site, Aiken, South Carolina (DOE/EIS-0220)

    Energy Technology Data Exchange (ETDEWEB)

    Grainger, A R

    1995-10-01

    This document evaluates the potential environmental impacts of alternatives for the stabilization of nuclear materials currently stored at various locations on the Savannah River Site (SRS). These materials remain from past defense-related production, testing, and other activities at the SRS and from chemical separations and related activities that DOE suspended in 1992. The EIS analyzes the following alternatives: Continuing Storage (No Action), Processing to Metal, Processing to Oxide, Blending Down to Low Enriched Uranium, Processing and Storage for Vitrification in the Defense Waste Processing Facility, Vitrification (F-Canyon), and Improving Storage. The preferred alternatives cover a combination of these in relation to the different types of material.

  1. KNOWLEDGE IN LEARNING COMPANIES

    Directory of Open Access Journals (Sweden)

    Alexandrina Cristina VASILE

    2016-05-01

    Full Text Available Changes are the only constant value in the current unpredictable economy. Under these circumstances leaders and employees must manage the external and internal environment and bring profitability for their companies. This paper gives an introductory approach to different perspective over learning companies in international literature. Different theoretical aspects, models and theories are taken into account for having a higher visibility to the complex concept of learning companies from leadership side to multiculturalism as the firm profitability should be the final goal of each economic system. The article concludes that not the process of learning is important but the adaptability to every different environment must be seen as vital.

  2. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  3. Effect of temperature and hydroxy-Al interlayers on Cs selectivity and fixation in river suspensions and soils. Final report

    International Nuclear Information System (INIS)

    Zelazny, L.W.; Martens, D.C.; El-Prince, A.M.; Rich, C.I.

    1978-01-01

    The adsorption of 137/sub Cs/ by sediments from the Savannah River Plant follows a theoretically expected linear relationship between ln Kd and l/T where kd and T are the equilibrium distribution coefficient and the temperature in kelvins, respectively. The slope of these plots decreases after removal of hydroxy Al interlayers. Hydroxy Al interlayers thus make Cs + adsorption more temperature dependent. The phenomenon is explained by considering hydroxy Al interlayers as a source of hydronium ions H 3 O + , which compete with Cs for exchange positions in wedge zones. An increase in temperature favors an increase in H 3 O ions, which in turn favors less adsorption of Cs + . Aside from their thermal effect the positively charged hydroxy aluminum polymeric groups drastically decrease the cation exchange capacity and, consequently, the adsorption of cesium. The adsorption of trace radioactive cesium by sediments from the Savannah River Plant area also follows a theoretically expected linear relationship between ln Kd and the pH of the equilibrium solution. Theoretically, the slope of these plots is proportional to the fraction of surface area occupied by pH dependent charges. Experimentally, the slope becomes zero after removal of hydroxy Al interlayers. Hydroxy Al interlayers are thus the main source for the pH dependent charges, making Cs + adsorption pH dependent also

  4. Feasibility of storing radioactive wastes in Columbia River basalts

    International Nuclear Information System (INIS)

    Deju, R.A.

    1976-01-01

    In 1968 Atlantic Richfield Hanford Company initiated a study to assess the feasibility of final geologic storage of Hanford defense, radioactive waste in deep caverns constructed in the Columbia River flood basalts. The project, which included geologic studies, hydrologic tests, heat flow analysis, compatibility analysis, and tectonic studies, was suspended in 1972 before completion of interpretive work. In 1976 the interpretation and documentation were completed. These data may be valuable in qualifying the Columbia River flood basalts as a viable medium for final geologic storage of commercial radioactive waste. The findings to date are summarized, and the proposed future work is presented

  5. Population genetic structure and life history variability in Oncorhynchus nerka from the Snake River basin. Final report

    International Nuclear Information System (INIS)

    Waples, R.S.; Aebersold, P.B.; Winans, G.A.

    1997-05-01

    The authors used protein electrophoresis to examine genetic relationships among samples of sockeye salmon and kokanee (Oncorhynchus nerka) from the Snake River basin. A few collections from elsewhere in the Pacific Northwest were also included to add perspective to the analysis. After combining temporal samples that did not differ statistically within and between years, 32 different populations were examined for variation at 64 gene loci scored in all populations. Thirty-five (55%) of these gene loci surveyed were polymorphic in at least one population. Average heterozygosities were relatively low (0.006--0.041), but genetic differentiation among populations was pronounced: the value of Wright's F ST of 0.244 is higher than has been reported in any other study of Pacific salmon

  6. High-temperature process-steam application at the Southern Union Refining Company, Hobbs, New Mexico (solar energy in the oil patch). Phase I design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-31

    Southern Union Refining Company's Famariss Energy Refinery has worked diligently with Monument Solar Corporation in the conceptual and detail design for this unique application of solar generated steam. An area closely adjacent to the refinery and fronting New Mexico State Highway No. 18 has been designated for the solar collector array. Space planned for the demonstration parabolic trough array is sufficiently large to handle an array of 25,200 square feet in size - an array more than twice the size of the 10,080 square feet proposed originally. The conceptual design, performance, safety, environmental impact, and economic analysis are described. Engineering drawings are included. (WHK)

  7. 76 FR 51887 - Safety Zone; Patuxent River, Patuxent River, MD

    Science.gov (United States)

    2011-08-19

    ...-AA00 Safety Zone; Patuxent River, Patuxent River, MD AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary safety zone during the ``NAS Patuxent River... held over certain waters of the Patuxent River adjacent to Patuxent River, Maryland from September 1...

  8. 75 FR 35786 - White River Minimum Flows-Addendum to Final Determination of Federal and Non-Federal Hydropower...

    Science.gov (United States)

    2010-06-23

    ... a revised discount rate selection for calculation of the present value of the losses for both the... determination rather than the discount rate selection proposed in the June 2009 draft addendum. Therefore, no change is required to the final determination related to the discount rate. The discount rate change...

  9. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Volume 2: Supplemental papers and data documentation; Final report

    International Nuclear Information System (INIS)

    Beamesderfer, R.C.; Nigro, A.A.

    1995-01-01

    This is the final report for research on white sturgeon Acipenser transmontanus from 1986--92 and conducted by the National Marine Fisheries Service (NMFS), Oregon Department of Fish and Wildlife (ODFW), US Fish and Wildlife Service (USFWS), and Washington Department of Fisheries (WDF). Findings are presented as a series of papers, each detailing objectives, methods, results, and conclusions for a portion of this research. This volume includes supplemental papers which provide background information needed to support results of the primary investigations addressed in Volume 1. This study addresses measure 903(e)(1) of the Northwest Power Planning Council's 1987 Fish and Wildlife Program that calls for ''research to determine the impact of development and operation of the hydropower system on sturgeon in the Columbia River Basin.'' Study objectives correspond to those of the ''White Sturgeon Research Program Implementation Plan'' developed by BPA and approved by the Northwest Power Planning Council in 1985. Work was conducted on the Columbia River from McNary Dam to the estuary

  10. Monitor and Protect Wigwam River Bull Trout for Koocanusa Reservoir : Summary of the Skookumchuck Creek Bull Trout Enumeration Project Final Report 2000-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, Jeremy; Baxter, James S.

    2002-12-01

    This report summarizes the third and final year of a bull trout (Salvelinus confluentus) enumeration project on Skookumchuck Creek in southeastern British Columbia. The fence and traps were operated from September 6th to October 11th 2002 in order to enumerate post-spawning bull trout. During the study period a total of 309 bull trout were captured at the fence. In total, 16 fish of undetermined sex, 114 males and 179 females were processed at the fence. Length and weight data, as well as recapture information, were collected for these fish. An additional 41 bull trout were enumerated upstream of the fence by snorkeling prior to fence removal. Coupled with the fence count, the total bull trout enumerated during the project was 350 individuals. Several fish that were tagged in the lower Bull River were recaptured in 2002, as were repeat and alternate year spawners previously enumerated in past years at the fence. A total of 149 bull trout redds were enumerated on the ground in 2002, of which 143 were in the 3.0 km index section (river km 27.5-30.5) that has been surveyed over the past six years. The results of the three year project are summarized, and population characteristics are discussed.

  11. Supplement to Final Environmental Statement related to construction and operation of Clinch River Breeder Reactor Plant, Docket No. 50-537

    International Nuclear Information System (INIS)

    1982-10-01

    In February 1977, the Office of Nuclear Reactor Regulation issued a Final Environmental Statement (FES) (NUREG-0139) related to the construction and operation of the proposed Clinch River Breeder Reactor Plant (CRBRP). Since the FES was issued, additional data relative to the site and its environs have been collected, several modifications have been made to the CRBRP design, and its fuel cycle, and the timing of the plant construction and operation has been affected in accordance with deferments under the DOE Liquid Metal Fast Breeder Reactor (LMFBR) program. These changes are summarized and their environmental significance is assessed in this document. The reader should note that this document generally does not repeat the substantial amount of information in the FES which is still current; hence, the FES should be consulted for a comprehensive understanding of the staff's environmental review of the CRBRP project

  12. Operation of Grand Gulf Nuclear Station, Units 1 and 2, Dockets Nos. 50-416 and 50-417: Mississippi Power and Light Company, Middle South Energy, Inc., South Mississippi Electric Power Association. Final environmental statement

    International Nuclear Information System (INIS)

    1981-09-01

    The information in this Final Environmental Statement is the second assessment of the environmental impacts associated with the construction and operation of the Grand Gulf Nuclear Station, Units 1 and 2, located on the Mississippi River in Claiborne County, Mississippi. The Draft Environmental Statement was issued in May 1981. The first assessment was the Final Environmental Statement related to construction, which was issued in August 1973 prior to issuance of the Grand Gulf Nuclear Station construction permits. In September 1981 Grand Gulf Unit 1 was 92% complete and Unit 2 was 22% complete. Fuel loading for Unit 1 is scheduled for December 1981. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the Station, and includes the staff responses to comments on the Draft Environmental Statement

  13. Evaluation of juvenile salmonid bypass facilities and passage at water diversions on the lower Umatilla River. Final report

    International Nuclear Information System (INIS)

    Cameron, W.A.; Knapp, S.M.; Carmichael, R.W.

    1997-07-01

    Outdated juvenile and adult fish passage facilities were recently reconstructed at the five major irrigation dams on the lower Umatilla River, Oregon to meet National marine Fisheries Service (NMFS) design standards. Changes in design at juvenile fish bypass facilities included reduced mesh size on the rotating drum screens, larger screening area, a more oblique orientation of the drum screens to canal flow, improved screen seals, replacement of bypass portals with vertical slot bypass channels, and increased bypass pipe diameters. Weir-and-pool adult fish ladders and jump pools were replaced with vertical-slot ladders. From 1991--1995, they investigated injury and travel rate of juvenile fish moving through the facilities, and efficiency of screens in preventing fish entry into the canals. Water velocities in front of canal screens, at bypass channel entrances, and at ladder diffusers were measured to assess adherence to NMFS criteria and identify hydraulic patterns. Biological evaluations were conducted by releasing and recapturing marked yearling summer steelhead (Oncorhynchus mykiss), yearling spring chinook salmon (O. tshawytscha), and subyearling fall chinook salmon (O. tshawytscha) in varying locations within the fish passage facilities

  14. Integrated Plant Safety Assessment: Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Final report

    International Nuclear Information System (INIS)

    1983-06-01

    The Systematic Evaluation program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  15. Report of the Economy, Sustainable Development and Land Planning Commission aiming at authorizing electricity final user and small companies to go back to the electricity regulated price

    International Nuclear Information System (INIS)

    2010-01-01

    This report first presents the French regulated price system by recalling the legal bases for electricity and natural gas pricing, and by describing the progressive process of the electricity and natural gas market opening in France. It outlines that a reversibility principle has been introduced along with regulated pricing in most of the European Union countries. It also comments the complexity created on this issue by successive laws in France, the consequences of the soon coming law on the new organization of the electricity market. Then, the report comments the proposition which aims at authorizing electricity household users and small companies to go back to the regulated electricity price, thereby perpetuating the reversibility principle, while maintaining a criterion of installed electricity power, including natural gas prices and new consumption sites. A table proposes a comparison between existing texts, the present law project and this Commission proposition

  16. Particulate Emissions Control using Advanced Filter Systems: Final Report for Argonne National Laboratory, Corning Inc. and Hyundai Motor Company CRADA Project

    Energy Technology Data Exchange (ETDEWEB)

    Seong, Hee Je [Argonne National Lab. (ANL), Argonne, IL (United States); Choi, Seungmok [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-10-09

    This is a 3-way CRADA project working together with Corning, Inc. and Hyundai Motor Co. (HMC). The project is to understand particulate emissions from gasoline direct-injection engines (GDI) and their physico-chemical properties. In addition, this project focuses on providing fundamental information about filtration and regeneration mechanisms occurring in gasoline particulate filter (GPF) systems. For the work, Corning provides most advanced filter substrates for GPF applications and HMC provides three-way catalyst (TWC) coating services of these filter by way of a catalyst coating company. Then, Argonne National Laboratory characterizes fundamental behaviors of filtration and regeneration processes as well as evaluated TWC functionality for the coated filters. To examine aging impacts on TWC and GPF performance, the research team evaluates gaseous and particulate emissions as well as back-pressure increase with ash loading by using an engine-oil injection system to accelerate ash loading in TWC-coated GPFs.

  17. Summary final report: Contract between the Japan atomic power company and the U.S. Department of Energy Improvement of core safety - study on GEM (III)

    International Nuclear Information System (INIS)

    Burke, T.M.; Lucoff, D.M.

    1997-01-01

    This report provides a summary of activities associated with the technical exchange between representatives of the Japan Atomic Power Company (JAPC) and the United States Department of Energy (DOE) regarding the development and testing of Gas Expansion Modules (GEM) at the Fast Flux Test Facility (FFTF). Issuance of this report completes the scope of work defined in the original contract between JAPC and DOE titled ''Study on Improvement of Core Safety - Study on GEM (III).'' Negotiations related to potential modification of the contract are in progress. Under the proposed contract modification, DOE would provide an additional report documenting FFTF pump start tests with GEMs and answer additional JAPC questions related to core safety with and without GEMs

  18. Summary final report: Contract between the Japan atomic power company and the U.S. Department of Energy Improvement of core safety - study on GEM (III)

    Energy Technology Data Exchange (ETDEWEB)

    Burke, T.M.; Lucoff, D.M.

    1997-03-18

    This report provides a summary of activities associated with the technical exchange between representatives of the Japan Atomic Power Company (JAPC) and the United States Department of Energy (DOE) regarding the development and testing of Gas Expansion Modules (GEM) at the Fast Flux Test Facility (FFTF). Issuance of this report completes the scope of work defined in the original contract between JAPC and DOE titled ''Study on Improvement of Core Safety - Study on GEM (III).'' Negotiations related to potential modification of the contract are in progress. Under the proposed contract modification, DOE would provide an additional report documenting FFTF pump start tests with GEMs and answer additional JAPC questions related to core safety with and without GEMs.

  19. Formerly utilized MED/AEC sites, Remedial Action Program: radiological survey of the Hooker Chemical Company, Niagara Falls, New York. Final report

    International Nuclear Information System (INIS)

    1977-01-01

    Results of a radiological survey of a portion of the Hooker Chemical Company, Niagara Falls, New York, are presented. The survey was conducted over 5.5-acres in which uranium-bearing materials were handled in the early 1940's. The survey included direct measurements of alpha, beta-gamma, and external gamma radiation throughout the site, measurement of transferable alpha and beta contamination levels in the buildings, determination of uranium and radium concentrations in the soild on the site, measurement of radon and radon daughter concentrations in the buildings, and determination of radionuclide concentrations in surface water samples. The results of the survey indicate that radiation levels throughout the site are within pertinent guidelines for unrestricted release of the property

  20. Integrated Plant Safety Assessment: Systematic Evaluation Program. Haddam Neck Plant, Connecticut Yankee Atomic Power Company, Docket No. 50-213. Final report

    International Nuclear Information System (INIS)

    1983-01-01

    The Systematic Evaluation Progam was initiated in February 1977 by the US Nuclear Regulatory Commission review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with curent licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Haddam Neck Plant, operated by Connecticut Yankee Atomic Power Company. The Haddam Neck Plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  1. Integrated Plant Safety Assessment: Systematic Evaluation Program. Millstone Nuclear Power Station, Unit 1, Northeast Nuclear Energy Company, Docket No. 50-245. Final report

    International Nuclear Information System (INIS)

    1983-02-01

    This report documents the review of the Millstone Nuclear Power Station, Unit 1, operated by Northeast Nuclear Energy Company (located in Waterford, Connecticut). Millstone Nuclear Power Station, Unit 1, is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license. This report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the Draft Report, issued in November 1982

  2. The Analysis of Bankruptcy Risk Using the Normal Distribution Gauss-Laplace in Case of a Company is the Most Modern Romanian Sea-River Port on the Danube

    Directory of Open Access Journals (Sweden)

    Rodica Pripoaie

    2015-08-01

    Full Text Available This work presents the application of the normal distribution Gauss-Laplace in case of a company is the most modern Romanian sea-river port on the Danube, specialized service providers, with a handling capacity of approx. 20,000,000 tons / year. The normal distribution Gauss-Laplace is the most known and used probability distribution, because it surprises better the evolution of economic and financial phenomena. Around the average, which has the greatest frequency, gravitate values more to less distant than average, but with the same standard deviation. It is noted that, although used in the forecasting calculations, analysis of profitability threshold - even ignores the risk of decisional operations (regarding deviations between the forecast and achievements, which may, in certain circumstances, influence much the activity of the company. This can be held into account when carefully studying the evolution of turnover follows a law of probability. In case not exist any information on the law of probability of turnover and no reason that one case appear more than another, according of Laplace law, we consider that these cases are uniformly distributed, therefore they follow a normal distribution.

  3. Final Environmental Statement related to the operation of Perry Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    The information in this Final Environmental Statement is the second assessment of the environmental impact associated with the construction and operation of the Perry Nuclear Power Plant, Units 1 and 2, located on Lake Erie in Lake County, about 11 km (7 mi) northeast of Painesville, Ohio. The first assessment was the Final Environmental Statement related to the construction of the plant issued in April 1974, prior to issuance of the construction permits (CPRR-148 and CPPR-149). Plant construction for Unit 1 is currently about 83% complete, and Unit 2 about 43% complete. Fuel loading for Units 1 and 2 currently estimated by the licensee (Cleveland Electric Illuminating Company) for November 1983, with Unit 2 fuel load scheduled for May 1987. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the plant

  4. Uranium potential of precambrian rocks in the Raft River area of northwestern Utah and south-central Idaho. Final report

    International Nuclear Information System (INIS)

    Black, B.A.

    1980-09-01

    A total of 1214 geochemical samples were collected and analyzed. The sampling media included 334 waters, 616 stream sediments, and 264 rocks. In addition, some stratigraphic sections of Elba and Yost Quartzites and Archean metasedimentary rock were measured and sampled and numerous radiation determinations made of the various target units. Statistical evaluation of the geochemical data permitted recognition of 156 uranium anomalies, 52 in water, 79 in stream sediment, and 25 in rock. Geographically, 68 are located in the Grouse Creek Mountains, 43 in the Raft River Mountains, and 41 in the Albion Range. Interpretation of the various data leads to the conclusion that uranium anomalies relate to sparingly and moderately soluble uraniferous heavy minerals, which occur as sparse but widely distributed magmatic, detrital, and/or metamorphically segregated components in the target lithostratigraphic units. The uraniferous minerals known to occur and believed to account for the geochemical anomalies include allanite, monazite, zircon, and apatite. In some instances samarskite may be important. These heavy minerals contain uranium and geochemically related elements, such as Th, Ce, Y, and Zr, in sufficient quantities to account for both the conspicuous lithologic preference and the generally observed low amplitude of the anomalies. The various data generated in connection with this study, as well as those available in the published literature, collectively support the conclusion that the various Precambrian W and X lithostratigraphic units pre-selected for evaluation probably lack potential to host important Precambrian quartz-pebble conglomerate uranium deposits. Moreover it is also doubted that they possess any potential to host Proterozoic unconformity-type uranium deposits

  5. Final environmental statement related to the operation of Midland Plant, Units 1 and 2. Docket Nos. 50-329 and 50-330, Consumers Power Company

    International Nuclear Information System (INIS)

    1982-07-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of the Midland Plant, Units 1 and 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the purpose and need for the Midland project, alternatives to the project, the affected environment, environment consequences and mitigating actions, and environmental and economic benefits and costs

  6. Public health assessment for petitioned public health assessment, Shaffer Equipment Company, Minden, Fayette County, West Virginia, Region 3. CERCLIS No. WVD981038300. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    The Shaffer Equipment Company (SEC) site, located in Fayette County, Minden, West Virginia constructed electrical substations for area coal mines from the period 1970 to 1984. The site is approximately one acre and has one building (SEC Equipment Building) that served as both a warehouse and office. Electrical equipment such as transformers, switches, circuit breakers, and capacitors were stored on the site. Dielectric oils that contained polychlorinated biphenyls (PCBs) and 1,2,4-trichlorobenzene were found in on- and off-site soils and sediments. Because PCBs are on site and PCB-contaminated oils reportedly were burned as starter fuel in the warehouse/office building, on- and off-site soil samples and on-site sediment samples were analyzed for polychlorinated dibenzo-p-dioxins (PCDDs) and polychlorinated dibenzo-p-furans (PCDFs). One present potential pathway of exposure that has been identified as past, present, and future concerns involve trespassers onto the SEC site, children playing in yards and Arbuckle Creek, on-site workers in the SEC Equipment Building, and persons that eat snapping turtles from the area

  7. Remedial actions at the former Vitro Chemical Company site, South Salt Lake, Salt Lake County, Utah. Volume I. Text. Final Environmental Impact Statement

    International Nuclear Information System (INIS)

    1984-07-01

    This statement evaluates the environmental impacts associated with the cleanup of those residues remaining at the abandoned uranium-mill-tailings site located in South Salt Lake, Utah, and hereinafter called the Vitro site. The site is a 128-acre property owned by the Central Valley Water Reclamation Facility (CVWRP) Board which also operates a sewage treatment plant adjacent to the northern boundaries of the Vitro site. The site contains approximately 2.5 million cubic yards of contaminated residues and soil; the residues were produced by the Vitro Chemical Company of America which processed uranium ore for sale to the US Atomic Energy Commission on the site from 1951 to 1964. This statement evaluates three alternatives for minimizing the public health hazards associated with the Vitro site contaminated materials: (1) no action; (2) stabilization of the contaminated material on the Vitro site; and (3) decontamination of the Vitro site and disposal of the contaminated material at a site located about one mile south of Clive, Utah. Alternative 3 is DOE's preferred alternative. An assessment of the impacts of these three alternatives was made in terms of effects on radiation levels, air quality, soils and mineral resources, surface- and ground-water resources, ecosystems, land use, sound levels, historical and cultural resources, populations and employment, economic structures, and transportation networks

  8. Development of water facilities in the Santa Ana River Basin, California, 1810-1968: a compilation of historical notes derived from many sources describing ditch and canal companies, diversions, and water rights

    Science.gov (United States)

    Scott, M.B.

    1977-01-01

    This report traces by text, maps, and photographs, the development of the water supply in the Santa Ana River basin from its beginning in 1810 or 1811 to 1968. The value of the report lies in the fact that interpretation of the hydrologic systems in the basin requires knowledge of the concurrent state of development of the water supply, because that development has progressively altered the local regimen of both surface water and ground water. Most of the information for the earlier years was extracted and condensed from an investigation made by W. H. Hall, California State Engineer during the years 1878-87. Hall's study described irrigation development in southern California from its beginning through 1888. Information for the years following 1888 was obtained from the archives of the numerous water companies and water agencies in the Santa Ana River basin and from the various depositories of courthouse, county, and municipal records. The history of water-resources development in the Santa Ana River basin begins with the introduction of irrigation in the area by the Spanish, who settled in southern California in the latter part, of the 18th century. The first irrigation diversion from the Santa Ana River was made in 1810 or 1811 by Jose Antonio Yorba and Juan Pablo Peralta. Irrigation remained a localized practice during the Mexican-Californian, or rancho, period following the separation of Mexico from Spain in 1821. Rancho grantees principally raised cattle, horses, and sheep and irrigated only small· plots of feed grain for their livestock and fruit crops for household use. The breakup of the ranchos through sales to Americans, who were migrating to California in ever-increasing numbers following the acquisition of California by the United States in 1848, marked the beginning of a rapid increase in water use and the beginning of widespread irrigation. Many water companies and water agencies were organized to divert the surface flow of the Santa Ana River and

  9. Environmental management system in companies

    International Nuclear Information System (INIS)

    Bonanno, C.

    1995-01-01

    The environmental management system, as the whole coordinated initiatives 'environmental oriented' introduced by companies in their organization, is discussed. Strategic weight that companies have to be present at the environmental management system is enlisted. Finally, the new professional figures of environmental technicians and environmental manager is discussed

  10. Selection and cultivation of final vegetative cover for closed waste sites at the Savannah River Site, SC

    International Nuclear Information System (INIS)

    Cook, J.R.; Salvo, S.K.

    1992-01-01

    Low-level, hazardous, and mixed waste disposal sites normally require some form of plant material to prevent erosion of the final closure cap. Waste disposal sites are closed and capped in a complex scientific manner to minimize water infiltration and percolation into and through the waste material. Turf type grasses are currently being used as a vegetative cover for most sites. Consequently, the sites require periodic mowing and other expensive annual maintenance practices. The purpose of this five year study was to evaluate alternative plant material for use on wastes sites that is quickly and easily established and economically maintained, retards water infiltration, provides maximum year-round evapotranspiration, is ecologically acceptable and does not harm the closure cap. The results of the study are described in this report and suggest that two species of bamboo (Phyllostachys bissetii and P. rubromarainata) can be utilized to provide long lived, low maintenance, climax vegetation for the waste sites. These large species of bamboo will also reduce the probability of intrusion by humans, animals and deeply rooted plant species

  11. Company analysis

    DEFF Research Database (Denmark)

    Jenster, Per V.; Hussey, David

    This volume looks at the company appraisal as a whole, examining the continuing need to appraise companies as part of the continuing strategy process. Building from a sound basis of theory, the text aims to be practical and to give guidance to senior managers and others involved in the strategy...... process. It is thus a book primarily aimed at managers, but should also be useful for MBA students undertaking strategy assignments It provides helpful, practical guidance and identifies weaknesses of traditional methods. It also presents a variety of tools which may be used in the appraisal process...

  12. An Evidence-Based Evaluation of the Cumulative Effects of Tidal Freshwater and Estuarine Ecosystem Restoration on Endangered Juvenile Salmon in the Columbia River: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Thom, Ronald M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Borde, Amy B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weitkamp, Laurie A. [Marine Sciences lab., Sequim, WA (United States); Buenau, Kate E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kropp, Roy K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-01

    measurements, data analyses, modeling, meta-analysis, and reanalysis of previously collected data sets. We identified a set of 12 ancillary hypotheses regarding habitat and salmon response. Each ancillary hypothesis states that the response metric will trend toward conditions at relatively undisturbed reference sites. We synthesized the evidence for and against the two necessary conditions by using eleven causal criteria: strength, consistency, specificity, temporality, biological gradient, plausibility, coherence, experiment, analogy, complete exposure pathway, and predictive performance. Our final evaluation included cumulative effects assessment because restoration is occurring at multiple sites and the collective effect is important to salmon recovery. We concluded that all five lines of evidence from the LCRE indicated positive habitat-based and fish-based responses to the restoration performed under the CEERP, although tide gate replacements on small sloughs were an exception. Our analyses suggested that hydrologic reconnections restore access for fish to move into a site to find prey produced there. Reconnections also restore the potential for the flux of prey from the site to the main stem river, where our data show that they are consumed by salmon. We infer that LCRE ecosystem restoration supports increased juvenile salmon growth and enhanced fitness (condition), thereby potentially improving survival rates during the early ocean stage.

  13. Edgemont uranium mill decommissioning, Fall River County, South Dakota (adoption as a final environmental impact statement (EIS) of the Nuclear Regulatory Commission's final EIS of September 1982): final environmental impact statement

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Decommissioning of the existing uranium milling facilities at Edgemont, South Dakota is proposed. In this adoption by the Tennessee Valley Authority of the Nuclear Regulatory Commission's final environmental impact statement on the decommissioning, no significant deviations from that statement are presented. The project would prevent human exposure to radioactive material emitted by the defunct mill and its ancillary facilities. Reclamation of mill and waste impoundment sites would ensure their future usefulness for wildlife habitat and other purposes. Grading operations could result in occasional particulate levels that exceed federal air quality standards. As much as 105 acre-feet of water could be removed from the Pahasapa Aquifer. Disturbance of soils at the sites would degrade the quality of these soils. Approximately 501 acres of land, including 30 acres of land to be used as haul roads, would be denuded; 86 acres of farmland within the disposal site would be lost. All aquatic communities in Cottonwood Creek would be destroyed during cleanup operations, although the creek would be repopulated. Winddown tailings would increase downwind radiation levels during decommissioning activities

  14. Program GICC - AQUABIO. Possible consequences of the climatic change on the aquatic and river french biocenoses. Final report; Programme GICC - AQUABIO. Consequences potentielles du changement climatique sur les biocenoses aquatiques et riveraines francaises. Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Pont, D [Lyon-1 Univ., CNRS UMR 5023, Ecologie des Hydrosystemes Fluviaux, 69 - Villeurbanne (France)

    2003-11-15

    The consequences of the climatic change can modify the ecosystems. The aim of this research program is to analyze the impacts of the climatic change on the propagation of the exotic species in France in aquatic and river environment, the population of macro invertebrates and fishes in the french rivers and the socio economic challenges. The methodology is based on the simulation from the exploitation of great data bases and the combination of many approaches at different scales. (A.L.B.)

  15. SAFER - Company Snapshot - SAFER - Company Snapshot

    Data.gov (United States)

    Department of Transportation — The Company Snapshot is a concise electronic record of company identification, size, commodity information, and safety record, including the safety rating (if any),...

  16. Final inform of the studies carried out by the Geological Institute of Uruguay in the zone of Paso Severino of Santa Lucia small river

    International Nuclear Information System (INIS)

    1973-01-01

    This inform is about the geological conditions study carried out in Paso Severino zone of the Santa Lucia small river to make a dam to provide water to Montevideo. The techniques used were photo interpretation and general geological studies.

  17. Columbia River White Sturgeon (Acipenser Transmontanus) Population Genetics and Early Life History Study, January 1, 1986 to December 31, 1986, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Brannon, Ernest L.

    1986-12-01

    The 1986 Columbia River white sturgeon investigations continued to assess genetic variability of sturgeon populations isolated in various areas of the Columbia River, and to examine environmental factors in the habitat that may affect early life history success. Baseline data have been collected for three character sets. Twenty-eight loci have been analyzed for differences using electrophoresis, snout shapes were assessed for multivariate distinction, and scute counts have been examined as an index of variability. Fish that reside in the mid-Columbia and lower river have been sufficiently characterized by electrophoresis to compare with up-river areas. To date, few electrophoretic differences have been identified. However, Lake Roosevelt sturgeon sample size will be increased to determine if some of the observed differences from lower river fish are significant. Snout shape has been shown to be easily quantifiable using the digitizing technique. Scute count data initially indicate that variability exists within as well as between areas. Patterns of differentiation of one or more of these data sets may be used to formulate stock transplant guidelines essential for proper management or enhancement of this species. The historical habitat available to sturgeon in the Columbia River has changed through the development of hydroelectric projects. Dams have reduced the velocity and turbulence, and increased light penetration in the water column from less silt. These changes have affected the ability of sturgeon to feed and have made them more vulnerable to predation, which appear to have altered the ability of populations isolated in the reservoirs to sustain themselves. Present studies support the theory that both the biological and physical habitat characteristics of the Columbia River are responsible for reduced sturgeon survival, and justify consideration of enhancement initiatives above Bonneville to improve sturgeon reproductive success.

  18. Effects of the Operation of Kerr and Hungry Horse Dams on the Kokanee Fishery in the Flathead River System, 1979-1985 Final Research Report.

    Energy Technology Data Exchange (ETDEWEB)

    Clancy, Patrick

    1986-05-01

    This study was undertaken to assess the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. Studies concerning operation of the dam on the Flathead River aquatic biota began in 1979 and continued to 1982 under Bureau of Reclamation funding. These studies resulted in flow recommendations for the aquatic biota in the main stem Flathead River, below the influence of Hungry Horse Dam on the South Fork. Studies concerned specifically with kokanee salmon have continued under Bonneville Power Administration funding since 1982. This completion report covers the entire study period (September 1979 to June 1985). Major results of this study were: (1) development and refinement of methods to assess hydropower impacts on spawning and incubation success of kokanee; (2) development of a model to predict kokanee year class strength from Flathead River flows; and (3) implementation of flows favorable for successful kokanee reproduction. A monitoring program has been developed which will assess the recovery of the kokanee population as it proceeds, and to recommend management strategies to maintain management goals for the kokanee fishery in the river system.

  19. Transacsys PLC - Final Results

    CERN Multimedia

    2002-01-01

    Final results from Transacsys PLC. A subsidary of this company was set up to develop the CERN EDH system into a commercial product but incurred too much financial loss so the project was cancelled (1/2 page).

  20. VUJE, Inc. Company mission

    International Nuclear Information System (INIS)

    2008-01-01

    VUJE is an engineering company that performs design, supply, implementation, research and training activities, particularly in the field of nuclear and conventional power generation. Our earlier research specialization in the field of nuclear power generation has gradually diversified into design and engineering activities during performing particular tasks. Nowadays we are able to provide all activities related to construction, operation, modernisation and finally termination of operation mainly of power generating facilities. Our objective is to offer complex, professional and quality solutions according to our customers' needs and thus assist to show real asset of nuclear energy generation. (author)

  1. Columbia River White Sturgeon (Acipenser Transmontanus) Early Life History and Genertics Study, August 1, 1984 to December 31, 1985 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Brannon, Ernest L.

    1985-12-01

    Research on Columbia River white sturgeon has been directed at their early life history as it may apply to production and enhancement strategies for management of the species. The river environment in which sturgeon historically migrated, spawned, and reared has changed through development. Habitat changes are expected to precipitate genetic changes in the fish, as well as reduce the fitness in populations. Genetic analysis of samples taken from various locations over the length of the Columbia River have indicated that observed gene frequencies in all areas sampled were not in Hardy-Weinburg equilibrium, which could suggest that the general population is experiencing perturbation in the system. Analysis thus far has exposed few differences between samples from the lower, middle, and upper portions of the system. Allelic differences were identified in fish from the Roosevelt Lake, which may be evidence of unique characteristics among fish from that general area.

  2. PATRONES DE CONSUMO FINAL DE CÉRVIDOS EN EL PARANÁ MEDIO: EL CASO DEL SITIO CERRO AGUARÁ / Cervids final consumption patterns in middle Paraná River: the case of Cerro Aguará archaeological site

    Directory of Open Access Journals (Sweden)

    Leonardo Mucciolo

    2015-06-01

    Full Text Available Los cérvidos fueron amplia y regularmente explotados por los cazadores-recolectores que habitaron la macroregión del Paraná-Plata durante el Holoceno tardío. En la cuenca media del Paraná, sin embargo, muy pocos estudios han enfocado sobre las estrategias empleadas para su obtención, procesamiento y consumo. Teniendo en cuenta esto, el objetivo de este trabajo es explorar dichos aspectos a partir del análisis de los conjuntos de cérvidos provenientes del sitio arqueológico Cerro Aguará, localizado en el departamento General Obligado (provincia de Santa Fe. La perspectiva seleccionada propone al consumo como factor preponderante en la configuración del registro zooarqueológico dentro del continuum de actividades que componen la explotación faunística. Desde esta perspectiva, y tomando en consideración que las carcasas de los cérvidos proveen distintos tipos de recursos alimenticios con diferentes costos de extracción (carne, médula y grasa ósea, se evalúan diferentes indicadores para establecer si existió diferente intensidad en su procesamiento. Los resultados indican que las dos especies de cérvidos identificadas en el sitio, Blastocerus dichotomus y Ozotoceros bezoarticus, ocuparon un rol preponderante en la dieta, aunque las carcasas del primero fueron empleadas más intensivamente probablemente en correlación con su mayor disponibilidad de nutrientes internos, tales como la médula y posiblemente la grasa ósea.  Abstract  Cervids were wide and regularly exploited by several Late Holocene hunter-gatherers inhabiting Paraná Plata macroregion. In the middle Paraná river, however, few research has been made on strategies involving their procurement, processing and consumption. The purpose of this article is to explore those aspects from the analysis of cervid assemblages of Cerro Aguará archaeological site (General Obligado, Santa Fe province. The selected perspective proposes final consumption as one of the most

  3. 78 FR 77114 - Pacific Gas and Electric Company: Notice of Application Accepted for Filing, Soliciting Comments...

    Science.gov (United States)

    2013-12-20

    ... Company (licensee). e. Name of Projects: Potter Valley Project. f. Location: Eel River and East Fork... Company, Mail Code: N11C P.O. Box 770000 San Francisco, CA 94177. Phone (415) 973-3076. i. FERC Contact...

  4. Final Environmental Assessment: Construction of Maintenance and Storage Facility, Perimeter Fence Upgrade and Demolition of Three Buildings and Two Structures Gila River Air Force Space Surveillance Station Arizona

    Science.gov (United States)

    2012-11-01

    Estrella mountain range is approximately six miles west of the Installation and the Sacaton mountain range lie approximate- ly six miles to the southeast...Structures 3-4 Figure 5. Geological Map of Gila River AFSSS and Vicinity Sierra Estrella Range Sacaton Range EA — Construct Maintenance & Storage

  5. Columbia River System Operation Review final environmental impact statement. Appendix S: U.S. Fish and Wildlife Service Coordination Act Report

    International Nuclear Information System (INIS)

    1995-11-01

    This document constitutes the report of the US Fish and Wildlife Service (FWS) relating to the proposed Columbia River System Operation Review (SOR). The SOR proposed alternative consists of a number of specific water management manipulations and new management targets for operating the network of existing Federal Columbia River Power System dams and facilities. This report, therefore, presents a broader, ecosystem planning and management approach for evaluating and resolving those operational and biological uncertainties. Potential mitigation, enhancement and restoration actions associated with the preferred alternative will require an adaptive implementation approach. At the present time and as further changes anticipated in SOR operations occur, the complete, ecosystemwide, synergistic effects of the operation of the current Federal Columbia River Power System cannot be adequately ascertained. However, the initial elements of ecosystem-based remedies are presented in Sections 4 and 5 of this report. These remedies are intended to stimulate action to help conserve distressed fish and wildlife populations, while furthering understanding of the impacts of the SOR preferred alternative on the ecosystem. This Coordination Act Report is the first attempt to integrate fish and wildlife mitigation, enhancement, recovery and restoration needs with the proposed action and the existing Federal Columbia River Power System

  6. Evaluation of the Contribution of Fall Chinook Salmon Reared at Columbia River Hatcheries to the Pacific Salmon Fisheries, 1989 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Vreeland, Robert R.

    1989-10-01

    In 1979 this study was initiated to determine the distribution, contribution, and value of artificially propagated fall chinook salmon from the Columbia River. Coded wire tagging (CWT) of hatchery fall chinook salmon began in 1979 with the 1978 brood and was completed in 1982 with the 1981 brood of fish at rearing facilities on the Columbia River system. From 18 to 20 rearing facilities were involved in the study each brood year. Nearly 14 million tagged fish, about 4% of the production, were released as part of this study over the four years, 1979 through 1982. Sampling for recoveries of these tagged fish occurred from 1980 through 1986 in the sport and commercial marine fisheries from Alaska through California, Columbia River fisheries, and returns to hatcheries and adjacent streams. The National Marine Fisheries Service coordinated this study among three fishery agencies: US Fish and Wildfire Service, Oregon Department of Fish and Wildlife, and Washington Department of Fisheries. The objectives of this study were to determine the distribution, fishery contribution, survival, and value of the production of fall chinook salmon from each rearing facility on the Columbia River system to Pacific coast salmon fisheries. To achieve these objectives fish from each hatchery were given a distinctive CWT. 81 refs., 20 figs., 68 tabs.

  7. Effects of Hyporheic Exchange Flows on Egg Pocket Water Temperature in Snake River Fall Chinook Salmon Spawning Areas, 2002-2003 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, T.; Geist, D.; Arntzen, C. (Pacific Northwest National Laboratory)

    2004-09-01

    The development of the Snake River hydroelectric system has affected fall Chinook salmon smolts by shifting their migration timing to a period (mid- to late-summer) when downstream reservoir conditions are unfavorable for survival. Subsequent to the Snake River Chinook salmon fall-run Evolutionary Significant Unit being listed as Threatened under the Endangered Species Act, recovery planning has included changes in hydrosystem operations (e.g., summer flow augmentation) to improve water temperature and flow conditions during the juvenile Chinook salmon summer migration period. In light of the limited water supplies from the Dworshak reservoir for summer flow augmentation, and the associated uncertainties regarding benefits to migrating fall Chinook salmon smolts, additional approaches for improved smolt survival need to be evaluated. This report describes research conducted by the Pacific Northwest National Laboratory (PNNL) that evaluated relationships among river discharge, hyporheic zone characteristics, and egg pocket water temperature in Snake River fall Chinook salmon spawning areas. This was a pilot-scale study to evaluate these relationships under existing operations of Hells Canyon Dam (i.e., without any prescribed manipulations of river discharge) during the 2002-2003 water year. The project was initiated in the context of examining the potential for improving juvenile Snake River fall Chinook salmon survival by modifying the discharge operations of Hells Canyon Dam. The potential for improved survival would be gained by increasing the rate at which early life history events proceed (i.e., incubation and emergence), thereby allowing smolts to migrate through downstream reservoirs during early- to mid-summer when river conditions are more favorable for survival. PNNL implemented this research project at index sites throughout 160 km of the Hells Canyon Reach (HCR) of the Snake River. The HCR extends from Hells Canyon Dam (river kilometer [rkm] 399

  8. American River Watershed Project, California. Part 1: Main Report. Part 2: Final Supplemental Environmental Impact Statement/Environmental Impact Report. Supplemental Information Report

    Science.gov (United States)

    1996-03-01

    American River canyon provided by Dr. B. Allen- Diaz at the University of California at Berkeley, tree densities were calculated at between 50 and 130...air quality, fisheries, recreation, and Comment/Response appendix SEIS 12-1 List of Preparers Name/Expertise Experience Role in Preparing SEIS Alicia

  9. Determinants of the company value

    Directory of Open Access Journals (Sweden)

    Kamila Růžičková

    2011-01-01

    Full Text Available Today, there are many conceptions involving creation of the company value, as it is the main objective for the owners. However, there are still many companies interested primarily in the different company’s objectives and enhance its competitive position differently. The aim of the paper is to present and analyze the viewpoints of Czech and foreign specialists on the issue of company value creation. The paper provides the determination of factors positively influencing the company value, the description of their characteristics, and on the basis of a detailed academic discussion proposes conclusions. Attention is paid especially to the value drivers which are not recorded in the financial documents.The introduction of the paper gives a brief overview of the topic. The paper is divided into three main parts. The first part introduces the effective cost management. It clarifies the concept of the managerial accounting and explains its contribution to the creation of the company value. The second part deals with the external relationships of the company. It focuses on the buyer-supplier relationships and offers the detailed perspective on the specific issue of the agricultural companies and their competitiveness in relation to the land leases. The third part concentrates on the internal company environment, namely on the human capital potential and its effects on the value of the company. In the concluding part, the findings are summarized. Based on the results, the figure describing the determinants and generators of the company value is formed. This figure can be considered a systematic procedure how to create a company value.All findings are supported with the literature review e.g. Armstrong (2007, Fibírová and Šoljaková (2005, Marinič (2008, Petřík (2007 and Porter (2004. Within the paper elaboration, the analysis and synthesis as scientific methods were used for explanation of the experts’ points of view and then summed up as the

  10. Assessment of the Flow-Survival Relationship Obtained by Sims and Ossiander (1981) for Snake River Spring/Summer Chinook Salmon Smolts, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Steward, C.R. (Cleveland R.)

    1994-04-01

    There has been much debate recently among fisheries professionals over the data and functional relationships used by Sims and Ossiander to describe the effects of flow in the Snake River on the survival and travel time of chinook salmon and steelhead smolts. The relationships were based on mark and recovery experiments conducted at various Snake and Columbia River sites between 1964 and 1979 to evaluate the effects of dams and flow regulation on the migratory characteristic`s chinook sa mon and steelhead trout smolts. The reliability of this information is crucial because it forms the logical basis for many of the flow management options being considered today to protect,upriver populations of chinook salmon and steelhead trout. In this paper I evaluate the primary data, assumptions, and calculations that underlie the flow-survival relationship derived by Sims and Ossiander (1981) for chinook salmon smolts.

  11. Assessment of the flow-survival relationship obtained by Sims and Ossiander (1981) for Snake River spring/summer chinook salmon smolts. Final report

    International Nuclear Information System (INIS)

    Steward, C.R.

    1994-04-01

    There has been much debate recently among fisheries professionals over the data and functional relationships used by Sims and Ossiander to describe the effects of flow in the Snake River on the survival and travel time of chinook salmon and steelhead smolts. The relationships were based on mark and recovery experiments conducted at various Snake and Columbia River sites between 1964 and 1979 to evaluate the effects of dams and flow regulation on the migratory characteristic's chinook sa mon and steelhead trout smolts. The reliability of this information is crucial because it forms the logical basis for many of the flow management options being considered today to protect,upriver populations of chinook salmon and steelhead trout. In this paper I evaluate the primary data, assumptions, and calculations that underlie the flow-survival relationship derived by Sims and Ossiander (1981) for chinook salmon smolts

  12. The Clinch River Breeder Reactor Plant: an analysis of the impacts of its in-migrant construction workers on local public services. Final report

    International Nuclear Information System (INIS)

    Braid, R.B. Jr.; Kyles, S.D.

    1977-05-01

    The socioeconomic impact study identifies certain impacts which are projected to occur to local public services in each of 14 Tennessee communities in the Oak Ridge-Knoxville area during the construction of the Clinch River Breeder Reactor Plant. Various in-migration scenarios are utilized, and detailed qualitative and quantitative analyses of each public service are undertaken. Per capita in-migrant cost-revenue impacts are calculated for each community in each in-migration scenario

  13. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13

    This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat

  14. Migrational Characteristics, Biological Observations, and Relative Survival of Juvenile Salmonids Entering the Columbia River Estuary, 1966-1983, 1985 Final Report of Research.

    Energy Technology Data Exchange (ETDEWEB)

    Dawley, Earl M.

    1986-04-01

    Natural runs of salmonids in the Columbia River basin have decreased as a result of hydroelectric-dam development, poor land- and forest-management, and over-fishing. This has necessitated increased salmon culture to assure adequate numbers of returning adults. Hatchery procedures and facilities are continually being modified to improve both the efficiency of production and the quality of juveniles produced. Initial efforts to evaluate changes in hatchery procedures were dependent upon adult contributions to the fishery and returns to the hatchery. Procedures were developed for sampling juvenile salmon and steelhead entering the Columbia River estuary and ocean plume. The sampling of hatchery fish at the terminus of their freshwater migration assisted in evaluating hatchery production techniques and identifying migrational or behavioral characteristics that influence survival to and through the estuary. The sampling program attempted to estimate survival of different stocks and define various aspects of migratory behavior in a large river, with flows during the spring freshet from 4 to 17 thousand cubic meters per second (m/sup 3//second).

  15. SAFER - Company Snapshot

    Data.gov (United States)

    Department of Transportation — The Company Snapshot is a concise electronic record of company identification, size, commodity information, and safety record, including the safety rating (if any),...

  16. Summary Report for Bureau of Fisheries Stream Habitat Surveys : Umatilla, Tucannon, Asotin, and Grande Ronde River Basins, 1934-1942, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    McIntosh, Bruce A.; Clark, Sharon E.; Sedell, James R.

    1995-01-01

    This document contains summary reports of stream habitat surveys, conducted in the Umatilla and Grande Ronde River basins, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1938-1942. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead (Rich, 1948). The purpose of the survey was, as described by Rich, 'to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes'. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949-1952 by the U.S. Fish and Wildlife Service. The reports were brief, qualitative accounts of over 5000 miles of stream surveys conducted by the BOF from 1934-1946 (Bryant, 1949; Bryant and Parkhurst, 1950; Parkhurst, 1950a-c; Parkhurst et al 1950). Despite their brevity, these BOF reports have formed the basis for estimating fish habitat losses and conditions in the Columbia River Basin (Fulton, 1968, 1970; Thompson, 1976; NPPC, 1986). Recently, the field notebooks from the BOF surveys were discovered. The data is now archived and stored in the Forest Science DataBank at Oregon State University (Stafford et al., 1984; 1988). These records are the earliest and most comprehensive documentation available of the condition and extent of anadromous fish habitat before hydropower development in the Columbia River Basin. They provide the baseline data for quantifying changes and setting a benchmark for future restoration of anadromous fish habitat throughout the Basin. The summaries contained in this book are exact replicates of the originals. Due to discrepancies between the field data and the summaries, the database should be used to assess pool and substrate conditions. This data is available from the

  17. Research, Monitoring, and Evaluation of Avian Predation on Salmonid Smolts in the Lower and Mid-Columbia River, 2006 Final Season Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Roby, Daniel D. [USGS - Oregon Cooperative Fish and Wildlife Research Unit, Oregon State University; Collis, Ken [Real Time Research, Inc.; Lyons, Donald E. [USGS - Oregon Cooperative Fish and Wildlife Research Unit, Oregon State University

    2009-06-18

    This study investigates predation by piscivorous waterbirds on juvenile salmonids (Oncorhynchus spp.) from throughout the Columbia River Basin. During 2006, study objectives in the Columbia River estuary, work funded by the Bonneville Power Administration, were to (1) monitor and evaluate previous management initiatives to reduce Caspian tern (Hydroprogne caspia) predation on juvenile salmonids (smolts); (2) measure the impact of double-crested cormorant (Phalacrocorax auritus) predation on smolt survival, and assess potential management options to reduce cormorant predation; and (3) monitor large colonies of other piscivorous waterbirds in the estuary (i.e., glaucous-winged/western gulls [Larus glaucescens/occidentalis]) to determine the potential impacts on smolt survival. Study objectives on the mid-Columbia River, work funded by the Walla Walla District of the U.S. Army Corps of Engineers, were to (1) measure the impact of predation by Caspian terns and double-crested cormorants on smolt survival; and (2) monitor large nesting colonies of other piscivorous waterbirds (i.e., California gulls [L. californicus], ring-billed gulls [L. delawarensis], American white pelicans [Pelecanus erythrorhynchos]) on the mid-Columbia River to determine the potential for significant impacts on smolt survival. Our efforts to evaluate system-wide losses of juvenile salmonids to avian predation indicated that Caspian terns and double-crested cormorants were responsible for the vast majority of smolt losses to avian predators in the Columbia Basin, with most losses occurring in the Columbia River estuary. In 2006, East Sand Island in the Columbia River estuary supported the largest known breeding colonies of Caspian terns and double-crested cormorants in the world. The Caspian tern colony on East Sand Island consisted of about 9,200 breeding pairs in 2006, up slightly (but not significantly so) from the estimate of colony size in 2005 (8,820 pairs). There has not been a

  18. Summary Report for Bureau of Fisheries Stream Habitat Surveys : Clearwater, Salmon, Weiser, and Payette River Basins, 1934-1942, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    McIntosh, Bruce A.; Clark, Sharon E.; Sedell, James R.

    1995-01-01

    This document contains summary reports of stream habitat surveys, conducted in Idaho, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1938-1942.. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead (Rich, 1948). The purpose of the survey was, as described by Rich, 'to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes'. The Idaho portion of the survey consisted of extensive surveys of the Clearwater, Salmon, Weiser, and Payette River Subbasins. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949-1952 by the U.S. Fish and Wildlife Service. The reports were brief, qualitative accounts of over 5000 miles of stream surveys conducted by the BOF from 1934-1946 (Bryant, 1949; Bryant and Parkhurst, 1950; Parkhurst, 1950a-c; Parkhurst et al., 1950). Despite their brevity, these BOF reports have formed the basis for estimating fish habitat losses and conditions in the Columbia River Basin (Fulton, 1968, 1970; Thompson, 1976; NPPC, 1986). Recently, the field notebooks from the BOF surveys were discovered. The data is now archived and stored in the Forest Science DataBank at Oregon State University (Stafford et al., 1984; 1988). These records are the earliest and most comprehensive documentation available of the condition and extent of anadromous fish habitat before hydropower development in the Columbia River Basin. They provide the baseline data for quantifying changes and setting a benchmark for future restoration of anadromous fish habitat throughout the Basin. The summaries contained in this book are exact replicates of the originals. Due to discrepancies between the field data and the summaries, the database

  19. Dispersion of Metals from Abandoned Mines and their Effect on Biota in the Methow River, Okanogan County, Washington: Final Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Peplow, Dan; Edmonds, Robert

    2003-05-15

    A study of mine-waste contamination effects on Methow River habitat on the eastern slopes of the north Cascade Mountains in Washington state, U.S.A., revealed impacts at ecosystem, community, population, individual, tissue, and cellular levels. Ore deposits in the area were mined for gold, silver, copper and zinc until the early 1950's, but the mines are now inactive. An above-and-below-mine approach was used to compare potentially impacted to control sites. The concentrations of eleven trace elements (i.e., Al, As, B, Ba, Cd, Cr, Cu, Mn, Pb, Se, and Zn) in Methow River sediments downstream from the abandoned mine sites were higher than background levels. Exposed trout and caddisfly larvae in the Methow River showed reduced growth compared to controls. Samples of liver from juvenile trout and small intestine from exposed caddisfly larvae were examined for evidence of metal accumulation, cytopathological change, and chemical toxicity. Morphological changes that are characteristic of nuclear apoptosis were observed in caddisfly small intestine columnar epithelial and trout liver nuclei where extensive chromatin condensation and margination was observed. Histopathological studies revealed glycogen bodies were present in the cytosol and nuclei, which are indicators of Type IV Glycogen Storage Disease (GSD IV). This suggests food is being converted into glycogen and stored in the liver but the glycogen is not being converted back normally into glucose for distribution to other tissues in the body resulting in poor growth. Examination of trout hepatocytes by transmission electron microscopy revealed the accumulation of electron dense granules in the mitochondrial matrix. Matrix granules contain mixtures of Cd, Cu, Au, Pb, Ni, and Ti. Contaminated sediments caused adverse biological effects at different levels of biological organization, from the cellular to ecosystem-level responses, even where dissolved metal concentrations in the corresponding surface water met

  20. StreamNet; Northwest Aquatic Resource Information Network - Status of Salmon and Steelhead in the Columbia River Basin, 1995 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Duane A.; Beamesderfer, Raymond C. [Oregon Dept. of Fish and Wildlife, Enterprise, OR (United States); Woodard, Bob [Washington Dept. of Fish and Wildlife, Olympia, WA (United States)

    1996-04-01

    Information on fish populations, fisheries, and fish habitat is crucial to the success of ongoing program to protect, recover, enhance, and manage fish resources in the Columbia River Basin. However, pertinent data are often difficult to locate because it is scattered among many agencies and is often unpublished. The goal of this annual report is to bring many diverse data types and sources into a single comprehensive report on the status of anadromous fish runs in the Columbia River Basin and the environmental conditions that may affect that status. Brief summaries are provided to identify the type and scope of available information. This synopsis is intended to complement other more detailed reports to which readers are referred for comprehensive treatment of specific subjects. This first report focuses mainly on anadromous salmon and steelhead (primarily through 1994) but the authors intend to expand the scope of future issues to include resident species. This is the first of what the authors intend to be an annual report. They welcome constructive suggestions for improvements. This report is a product of the StreamNet (formerly Coordinated Information System and Northwest Environmental Data Base) project which is a part of the Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The project is called for in the Fish and Wildlife Program of the Northwest Power Planning Council. The project`s objective is to promote exchange and dissemination of information in a standardized electronic format throughout the basin. This project is administered by the Pacific States Marine Fisheries Commission with active participation by tribal, state, and federal fish and wildlife agencies.

  1. Performance evaluation of Central European companies

    Directory of Open Access Journals (Sweden)

    Petr Fiala

    2015-10-01

    Full Text Available The paper presents a modelling approach for performance comparison of Central European companies on three levels: country, industry, and company. The approach is based on Data Envelopment Analysis and Analytic Hierarchy Process. The proposed model consists of two basic sections. The first section estimates the importance of selected industries in the countries, whereas the second section evaluates the performance of companies within industries. The results of both sections are synthesized and finally the country performance is estimated. The evaluation is based on the data set resulting from a survey of companies from selected industries.

  2. Ecological relations between fish assemblages and their habitats in the Elbe River (ELFI). Final report; Oekologische Zusammenhaenge zwischen Fischgemeinschafts- und Lebensraumstrukturen der Elbe (ELFI). Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Nellen, W.; Kausch, H.; Thiel, R.; Ginter, R. (eds.)

    2002-12-01

    In the framework of the joint project, extensive data were obtained with regard to ecomorphology and hydro-dynamics of fish habitats, species diversity, age structure, abundance, habitat quality, habitat use, larval drift, migrations, growth, health status and population genetics of the fish fauna of the middle Elbe River. The data were stored in data banks and were used as basis to assess the middle Elbe River, to formulate a fish-ecological guiding view, and to develop predictive habitat models for different life stages of indicatory fish species. The data and results of the joint project will be stored in fish data banks of the ARGE Elbe and of the Federal Institute of Hydrology. The information is useful for the development of decision support systems. (orig.) [German] Im Rahmen des Verbundprojekts wurden umfangreiche Daten zu Oekomorphologie und Hydrodynamik von Fischhabitaten, zu Artendiversitaet, Altersstruktur, Abundanz, Habitatqualitaet und -nutzung, Larvendrift, Wanderungen, Wachstum, Gesundheitsstatus und Populationsgenetik der Fischfauna in der Mittelelbe erhoben und in Datenbanken abgelegt. Darauf aufbauend wurde die Mittelelbe fischoekologisch bewertet, ein fischoekologisches Leitbild formuliert und prognosefaehige Habitatmodelle fuer verschiedene Lebensstadien von Indikatorfischarten entwickelt. Die Daten und Ergebnisse des Verbundprojekts fliessen in die Fischdatenbanken der ARGE Elbe und der Bundesanstalt fuer Gewaesserkunde ein und stehen fuer die Entwicklung von DSS (Decision Support Systems) zur Verfuegung. (orig.)

  3. MERGER ACCOUTING FOR COMPANIES

    OpenAIRE

    SUCIU GHEORGHE

    2014-01-01

    Companies, especially nowadays, are characterized through great mobility, fast circulation of capital, occurring in their chase for profit. In this context, companies look for alliances, economical and political assistance. These objectives can materialize through merging of companies. The merger can be internal (between Romanian companies) or transboundary, which includes foreign companies. In order to correctly reflect these events, the merger operations must be regulated and mu...

  4. Reprocessing of seismic shear wave and tidem data collected at the A ampersand M areas of the Savannah River Plant. Final report, September 1992--December 1995

    International Nuclear Information System (INIS)

    1996-05-01

    The upper aquifers in the A ampersand M area of the Savannah River Site are known to be contaminated by chlorinated solvents. Remediation plans depend critically on continuity of a confining zone known as the Crouch Branch Confining Unit (C8CU), which occurs at depths between about 250 feet and 300 feet. Under DOE Contract No: DE-AC21-92MC29, administered by Morgantown Energy Technology Center (METC) surface and borehole geophysical methods were tested and further developed between 1993 and 1995 to map the lithology (clay content) and stratigraphy of the CBCU. It was found that time domain electromagnetics (TDEM) soundings were effective in mapping lithology and changes in lithology, and shear (S-) wave reflection surveys were effective in mapping stratigraphy. An integrated interpretation of the two methods yielded a rather complete image of lithology and stratigraphy of the CBCU

  5. Final report of the environmental measurement-while-drilling-gamma ray spectrometer system technology demonstration at the Savannah River Site F-Area Retention Basin

    Energy Technology Data Exchange (ETDEWEB)

    Lockwood, G.J.; Normann, R.A.; Williams, C.V.

    1997-08-01

    The environmental measurement-while-drilling-gamma ray spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides real-time environmental and drill bit data during drilling operations. The EMWD-GRS technology was demonstrated at Savannah River Site F-Area Retention Basin. The EMWD-GRS technology demonstration consisted of continuously monitoring for gamma-radiation-producing contamination while drilling two horizontal boreholes below the backfilled retention basin. These boreholes passed near previously sampled vertical borehole locations where concentrations of contaminant levels of cesium had been measured. Contaminant levels continuously recorded by the EMWD-GRs system during drilling are compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples.

  6. Aerial gamma ray and magnetic survey: Powder River R and D Project. Portions of the: Forsyth, Hardin, Montana Quadrangles; Sheridan, Arminto, Wyoming Quadrangles. Final report

    International Nuclear Information System (INIS)

    1979-05-01

    Thick Phaneorozoic sediments (greater than 17,000 feet) fill the northwest-trending Powder River Basin, which is the dominant tectonic structure in the study area. Lower Tertiary sediments comprise over 90% of the exposed units at the surface of the Basin. Small portions of the Bighorn Uplift, Casper Arch, and Porcupine Dome occupy the western edge of the study area. Numerous small claims and prospects are found in the Pumpkin Buttes - Turnercrest District at the south end of the study area (northeastern Arminto quadrangle). No economic deposits of uranium are known to exist in the area, according to available literature. Interpretation of the radiometric data resulted in 62 statistical uranium anomalies listed for this area. Most anomalies are found in the southern half of the study area within the Tertiary Fort Union and Wasatch Formations. Some are found in Cretaceous sediments in the adjoining uplifts to the west of the Basin

  7. Final report of the environmental measurement-while-drilling-gamma ray spectrometer system technology demonstration at the Savannah River Site F-Area Retention Basin

    International Nuclear Information System (INIS)

    Lockwood, G.J.; Normann, R.A.; Williams, C.V.

    1997-08-01

    The environmental measurement-while-drilling-gamma ray spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides real-time environmental and drill bit data during drilling operations. The EMWD-GRS technology was demonstrated at Savannah River Site F-Area Retention Basin. The EMWD-GRS technology demonstration consisted of continuously monitoring for gamma-radiation-producing contamination while drilling two horizontal boreholes below the backfilled retention basin. These boreholes passed near previously sampled vertical borehole locations where concentrations of contaminant levels of cesium had been measured. Contaminant levels continuously recorded by the EMWD-GRs system during drilling are compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples

  8. Sanitary landfill in situ bioremediation optimization test. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This work was performed as part of a corrective action plan for the Savannah River Site Sanitary Landfill. This work was performed for the Westinghouse Savannah River Company Environmental Restoration Department as part of final implementation of a groundwater remediation system for the SRS Sanitary Landfill. Primary regulatory surveillance was provided by the South Carolina Department of Health and Environmental Control and the US Environmental Protection Agency (Region IV). The characterization, monitoring and remediation systems in the program generally consisted of a combination of innovative and baseline methods to allow comparison and evaluation. The results of these studies will be used to provide input for the full-scale groundwater remediation system for the SRS Sanitary Landfill. This report summarizes the performance of the Sanitary Landfill In Situ Optimization Test data, an evaluation of applicability, conclusions, recommendations, and related information for implementation of this remediation technology at the SRS Sanitary Landfill

  9. Status and Habitat Requirements of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam Volume II; Supplemental Papers and Data Documentation, 1986-1992 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beamesderfer, Raymond C.; Nigro, Anthony A. [Oregon Dept. of Fish and Wildlife, Clackamas, OR (US)

    1995-01-01

    This is the final report for research on white sturgeon Acipenser transmontanus from 1986--92 and conducted by the National Marine Fisheries Service (NMFS), Oregon Department of Fish and Wildlife (ODFW), US Fish and Wildlife Service (USFWS), and Washington Department of Fisheries (WDF). Findings are presented as a series of papers, each detailing objectives, methods, results, and conclusions for a portion of this research. This volume includes supplemental papers which provide background information needed to support results of the primary investigations addressed in Volume 1. This study addresses measure 903(e)(1) of the Northwest Power Planning Council's 1987 Fish and Wildlife Program that calls for ''research to determine the impact of development and operation of the hydropower system on sturgeon in the Columbia River Basin.'' Study objectives correspond to those of the ''White Sturgeon Research Program Implementation Plan'' developed by BPA and approved by the Northwest Power Planning Council in 1985. Work was conducted on the Columbia River from McNary Dam to the estuary.

  10. River engineering

    NARCIS (Netherlands)

    De Vries, M.

    1993-01-01

    One dimension models - basic eauations, analytical models, numberical models. One dimensional models -suspended load, roughness and resistance of river beds. Solving river problems - tools, flood mitigation, bank protection.

  11. White Sturgeon Management Plan in the Snake River between Lower Granite and Hells Canyon Dams; Nez Perce Tribe, 1997-2005 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nez Perce Tribe Resources Management Staff, (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

    2005-09-01

    White sturgeon in the Hells Canyon reach (HCR) of the Snake River are of cultural importance to the Nez Perce Tribe. However, subsistence and ceremonial fishing opportunities have been severely limited as a result of low numbers of white sturgeon in the HCR. Hydrosystem development in the Columbia River Basin has depressed numbers and productivity of white sturgeon in the HCR by isolating fish in impounded reaches of the basin, restricting access to optimal rearing habitats, reducing the anadromous forage base, and modifying early life-history habitats. Consequently, a proactive management plan is needed to mitigate for the loss of white sturgeon production in the HCR, and to identify and implement feasible measures that will restore and rebuild the white sturgeon population to a level that sustains viability and can support an annual harvest. This comprehensive and adaptive management plan describes the goals, objectives, strategies, actions, and expected evaluative timeframes for restoring the white sturgeon population in the HCR. The goal of this plan, which is to maintain a viable, persistent population that can support a sustainable fishery, is supported by the following objectives: (1) a natural, stable age structure comprising both juveniles and a broad spectrum of spawning age-classes; (2) stable or increasing numbers of both juveniles and adults; (3) consistent levels of average recruitment to ensure future contribution to reproductive potential; (4) stable genetic diversity comparable to current levels; (5) a minimum level of abundance of 2,500 adults to minimize extinction risk; and (6) provision of an annual sustainable harvest of 5 kg/ha. To achieve management objectives, potential mitigative actions were developed by a Biological Risk Assessment Team (BRAT). Identified strategies and actions included enhancing growth and survival rates by restoring anadromous fish runs and increasing passage opportunities for white sturgeon, reducing mortality rates

  12. 78 FR 41689 - Safety Zone; Skagit River Bridge, Skagit River, Mount Vernon, WA

    Science.gov (United States)

    2013-07-11

    ... submerged automobiles and floating bridge debris in the Skagit River. Following the initial response and...-AA00 Safety Zone; Skagit River Bridge, Skagit River, Mount Vernon, WA AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a safety zone around the Skagit River Bridge...

  13. 75 FR 42432 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Science.gov (United States)

    2010-07-21

    ... Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental... abandonment of facilities by Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas... resources, fisheries, and wetlands; Cultural resources; Vegetation and wildlife; Endangered and threatened...

  14. Electric Holding Company Areas

    Data.gov (United States)

    Department of Homeland Security — Holding companies are electric power utilities that have a holding company structure. This vector polygon layer represents the area served by electric power holding...

  15. National Dam Inspection Program. Laurel Run Dam. NDI ID Number PA-00380. DER ID Number 35-6, Pennsylvania Gas and Water Company. Susquehanna River Basin, Laurel Run, Lackawanna County, Pennsylvania Phase I Inspection Report,

    Science.gov (United States)

    1980-04-01

    Supply. g. Design and Construction History. Laurel Run Dam was constructed in 1594 by Martin Cawley, a contractor from Archbald. The construction was...1T6Ace joly PHASE I INSPECTION REPORT -4 NATIONAL DAM INSPECTION PROGRAM Lime LAUREL RUN DAM PENNSYLVANIA GAS AND WATER COMPANY RESERVOIR AREA

  16. An Investigation of the Relationship Between Tritium in Groundwater and the Dendrochronology of Tritium in Trees at the Savannah River Site. Final report

    International Nuclear Information System (INIS)

    Murphy, C.E. Jr.; Kalin, R.M.

    1995-01-01

    This project was supported through ERDA to demonstrate that the temporal distribution of tritium can be documented by the analysis of bound hydrogen in annual tree-ring samples. The project focuses on two sample locations at the Savannah River Site (SRS), a nuclear material production facility located in Aiken, SC. The SRS provided samples of cross-sections from a single tree that were to be pooled together for analysis. Annual tree-rings were identified in each cross-section sample and separated for the period 1954 to 1993. These annual samples were ground and chemically treated to separate the hollocellulose fraction of the wood, then subsequently combusted and the resulting water counting using low-level liquid scintillation counting equipment. Additionally, the ground annual tree-rings were gamma-counted to determine any temporal variation in radionuclide activity and analyzed with x-ray fluorescence to find any temporal variation in trace-element concentrations. This report presents the results and is intended to be a compilation of the work

  17. From the Mountains of the Moon to the Grand Renaissance: misinformation, disinformation and, finally, information for cooperation in the Nile River basin

    Science.gov (United States)

    Zaitchik, B. F.; Habib, S.; Anderson, M. C.; Ozdogan, M.

    2012-12-01

    The Nile River basin is shared by 11 nations and approximately 200 million people. Eight of the riparian States are defined as Least Developed Countries by the United Nations, and about 50% of the total basin population lives below the international poverty line. In addition, eight of the eleven countries have experienced internal or external wars in the past 20 years, six are predicted to be water scarce by 2025, and, at present, major water resource development projects are moving forward in the absence of a fully recognized basin-wide water sharing agreement. Nevertheless, the Nile basin presents remarkable opportunities for transboundary water cooperation, and today—notwithstanding significant substantive and perceived disagreements between stakeholders in the basin—this cooperation is beginning to be realized in topics ranging from flood early warning to hydropower optimization to regional food security. This presentation will provide an overview of historic and present challenges and opportunities for transboundary water management in the Nile basin and will present several case studies in which improved hydroclimatic information and communication systems are currently laying the groundwork for advanced cooperation. In this context climate change acts as both stress and motivator. On one hand, non-stationary hydrology is expected to tax water resources in the basin, and it undermines confidence in conventionally formulated water sharing agreements. On the other, non-stationarity is increasingly understood to be an exogenous threat to regional food and water security that will require informed, flexible cooperation between riparian states.

  18. Development of an Effective Transport Media for Juvenile Spring Chinook Salmon to Mitigate Stress and Improve Smolt Survival During Columbia River Fish Hauling Operations, 1985 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wedemeyer, Gary A.

    1985-02-01

    Selected transport media consisting of mineral salt additions (Na/sup +/, Cl/sup -/, Ca/sup + +/, PO/sub 4//sup -3/, HCO/sub 3//sup -/, and Mg/sup + +/), mineral salts plus tranquilizing concentrations of tricaine methane sulfonate (MS-222), or MS-222 alone were tested for their ability to mitigate stress and increase smolt survival during single and mixed species hauling of Columbia River spring chinook salmon (Oncorhynchus tshawytscha) and steelhead trout (Salmo gairdneri). Successful stress mitigation was afforded by several formulations as indicated by protection against life-threatening osmoregulatory and other physiological dysfunctions, and against immediate and delayed hauling mortality. Effects on the seawater survival and growth of smolts hauled in transport media were used as the overall criterion of success. Of the fourteen chemical formulations tested, 10 ppM MS-222 emerged as top-rated in terms of ability to mitigate physiological stress during single and mixed species transport of juvenile spring chinook salmon at hauling densities of 0.5 or 1.0 lb/gallon. Immediate and delayed mortalities from hauling stress were also reduced, but benefits to early marine growth and survival were limited to about the first month in seawater. The two physical factors tested (reduced light intensity and water temperature) were generally less effective than mineral salt additions in mitigating hauling stress, but the degree of protection afforded by reduced light intensity was nevertheless judged to be physiologically beneficial. 36 refs., 1 fig., 19 tabs.

  19. Global oil company profiles

    International Nuclear Information System (INIS)

    1997-01-01

    Global Oil Company Profiles provides a comprehensive review of 50 of the top oil companies in the world. Each chapter is devoted to an individual company, providing an invaluable insight into the organisation, its structure and operations. Using the most recent data available, the report offers an up-to-date analysis of performance and future direction, as well as a unique benchmarking system for each company profiled. (author)

  20. Global gas company profiles

    International Nuclear Information System (INIS)

    1997-01-01

    This report provides a detailed assessment of 60 of the top gas companies form around the world, analysing them according to their internal dynamics and in relation to their competitors. It devotes each chapter to an individual company, providing invaluable insight into the organisation's operational background, financial performance and strategic goals. Using the most up-to-date information available, Global Gas Company Profiles allows you to make detailed analysis of each company's performance and future direction. (author)

  1. 77 FR 35 - Assessment of Fees on Large Bank Holding Companies and Nonbank Financial Companies Supervised by...

    Science.gov (United States)

    2012-01-03

    ... will work closely with the Board, to determine the population of assessed companies and the basis for...--Consolidated Balance Sheet) as reported on the bank holding company's four most recent Consolidated Financial... final rule is published and Treasury will work with the companies to verify the total assessable assets...

  2. 77 FR 3774 - Formations of, Acquisitions by, and Mergers of Bank Holding Companies

    Science.gov (United States)

    2012-01-25

    ..., Dupont, Indiana. River Valley Financial Bank, Madison, Indiana, the existing thrift subsidiary of... FEDERAL RESERVE SYSTEM Formations of, Acquisitions by, and Mergers of Bank Holding Companies The companies listed in this notice have applied to the Board for approval, pursuant to the Bank Holding Company...

  3. Section 1: Company directory

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a 1992 directory of those companies doing business in all areas of the independent power producers industry. The listing includes the company name, address, telephone and FAX numbers, and the name of a company contact. The listing is international in scope

  4. MERGER ACCOUTING FOR COMPANIES

    Directory of Open Access Journals (Sweden)

    SUCIU GHEORGHE

    2014-05-01

    Full Text Available Companies, especially nowadays, are characterized through great mobility, fast circulation of capital, occurring in their chase for profit. In this context, companies look for alliances, economical and political assistance. These objectives can materialize through merging of companies. The merger can be internal (between Romanian companies or transboundary, which includes foreign companies. In order to correctly reflect these events, the merger operations must be regulated and must respect national and international regulations. One important request concerning the merger operations is that the accounting values of the assets, debts and ownership equity must be brought to the present financial value.

  5. Savannah River Site Environmental Report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Arnett, M

    1999-06-09

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  6. Savannah River Site Environmental Report for 1998

    International Nuclear Information System (INIS)

    Arnett, M.

    1999-01-01

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program

  7. Marketing Plan for a Case company

    OpenAIRE

    Iadykina, Anastasiia; Pavlidi, Kiriaki

    2015-01-01

    The major objective of this thesis is composing a concise, reliable and useful marketing plan for a Phimiso - My Sushi Café. The necessity of implementing the marketing planning and document a marketing plan with an action program arose when the case company experienced the negative affect of poor concept with misleading message and way too wide expansion of the menu. All of the above lead to outflow of the customers and stagnancy of the company. The final document covers the traditi...

  8. The 'final order' problem

    NARCIS (Netherlands)

    Teunter, RH; Haneveld, WKK

    1998-01-01

    When the service department of a company selling machines stops producing and supplying spare parts for certain machines, customers are offered an opportunity to place a so-called final order for these spare parts. We focus on one customer with one machine. The customer plans to use this machine up

  9. Open Source Telecommunication Companies

    Directory of Open Access Journals (Sweden)

    Peter Liu

    2007-08-01

    Full Text Available Little is known about companies whose core business is selling telecommunications products that lever open source projects. Open source telecommunications (OST companies operate in markets that are very different from typical software product markets. The telecommunications market is regulated, vertically integrated, and proprietary designs and special chips are widely used. For a telecommunications product to be useful, it must interact with both access network products and core network products. Due to specifications in Service Agreements Levels, penalties for failures of telecommunications products are very high. This article shares information that is not widely known, including a list of OST companies and the open source projects on which they depend, the size and diversity of venture capital investment in OST companies, the nature of the commercial product-open source software and company-project relationships, ways in which OST companies make money, benefits and risks of OST companies, and competition between OST companies. Analysis of this information provides insights into the ways in which companies can build business models around open source software. These findings will be of interest to entrepreneurs, top management teams of incumbent companies that sell telecommunications products, and those who care about Ontario's ability to compete globally.

  10. Final environmental statement related to the operation of St. Lucie Plant, Unit No. 2. Docket No. 50-389, Florida Power and Light Company, Orlando Utilities Commission of the City of Orlando, Florida

    International Nuclear Information System (INIS)

    1982-04-01

    This final environmental statement was prepared by the US Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (the staff) in accordance with the Commission's Regulations, set forth in 10 CFR Part 51, which implement the requirements of the National Environmental Policy Act of 1969 (NEPA). Sections related to the aquatic environment were prepared in cooperation with the US Environmental Protection Agency, Region IV. This statement reviews the impact of operation of the St. Lucie Plant, Unit 2. Assessments that are found in this statement supplement those described in the Final Environmental Statement (FES-CP) that was issued in May 1974 in support of issuance of a construction permit for the unit

  11. Public Shareholdership Energy Companies

    International Nuclear Information System (INIS)

    Kist, A.W.; Crone, F.J.M.; Hudig, D.F.; Ketting, N.G.; De Swaan, T.; Willems, R.

    2008-06-01

    National and international developments on the energy markets and changes in legislation and regulation require a renewed strategic orientation of energy companies and their shareholders. Decentralized authorities will have to reconsider their position as a shareholder in energy companies carefully. This report provides an overview of the recommendations of the Kist Commission on how provinces and municipalities can make a well-considered choice as shareholder of energy companies. [mk] [nl

  12. Privatised companies and market

    International Nuclear Information System (INIS)

    Salini, M. P.

    2001-01-01

    The Italian Government decided to adopt the public company structure where a little group of medium-term investors had the task of supporting the transition of the privatised companies to the market. The article examines the reasons for this decision and its failure in attaining the purpose, not excluding the possibility for the public company of imposing itself in the long period and in a context of a minor legislative intervention and more effective Corporate Governance rules [it

  13. The Danish East India Company

    DEFF Research Database (Denmark)

    Sørensen, Karsten Engsig

    2005-01-01

    The article analysis the first Danish East India Company incorporated in 1616, which was the first Danish Stock Company and which has impacts even on modern Danish company la......The article analysis the first Danish East India Company incorporated in 1616, which was the first Danish Stock Company and which has impacts even on modern Danish company la...

  14. Charles River

    Science.gov (United States)

    Information on the efforts of the US EPA, the Commonwealth of Massachusetts, the municipalities within the Charles River Watershed and nongovernmental organizations to improve the water quality of the Charles River.

  15. River crossings: decision making scheme for the execution of protection work; Cruces de rios: esquema de toma de decisiones para la ejecucion de obras de proteccion

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Fernando C.; Carnicero, Martin [TGN - Transportadora de Gas del Norte S.A. (Argentina)

    2003-07-01

    TGN operates a natural gas transportation network of 7.700 kilometers of length that comprises most of Argentina and part of Chile, intercepting a considerable amount of rivers that travel in different geographic environments. In order to protect the integrity at river crossings, the Company implemented a program that includes monitoring, maintenance, assessment, characterization, design and construction of erosion control works in rivers. This document is focused in the method of assessment and characterization of problems related to river crossings and in its technical background. The final objective is to define a decision making scheme, useful to select the scope of work needed to assure pipeline protection and to obtain maximum benefits from the associated investments. (author)

  16. Virtual Company and Modelbank

    DEFF Research Database (Denmark)

    Thorsteinsson, Uffe

    1996-01-01

    Ansøgning til Socrates programmet vedr. Tematisk netværk inden for området Virtual Company and Modelbank......Ansøgning til Socrates programmet vedr. Tematisk netværk inden for området Virtual Company and Modelbank...

  17. Conclusion: The balanced company

    DEFF Research Database (Denmark)

    Scheuer, John Damm; Jensen, Inger

    2013-01-01

    This concluding chapter brings together the various research findings of the book "The balanced company - organizing for the 21st Century" and develops a general overview of their implications for our understanding of the balancing processes unfolding in companies and organizations....

  18. VULNERABILITY OF COMPANIES

    Directory of Open Access Journals (Sweden)

    ARMEAN ANDREEA

    2013-06-01

    Full Text Available In present, the study of vulnerability of companies is increasing in every field due to the unstable economic environment influences. The object of this research is to define and identify vulnerabilities of companies and the establishment of evaluation methods at their level. This article emphasizes the importance and usefulness of one of the best known model in this way, from our point of view, namely Băileşteanu, Negrila Pattern. This pattern covers both external factors and internal ones, that increase vulnerabilities of companies, and fit the companies in which the state of vulnerability are (vitality, viability, vulnerability, high vulnerability, difficulty and high difficulty, with a matrix. The result of the research is that any company belonging to any field, can be analyzed using this model, and assigned to one of the conditions defined within.

  19. 77 FR 108 - Lockhart Power Company, Inc.; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2012-01-03

    ... affect any federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r). h. Applicant Contacts: Bryan D. Stone, Chief Operating Officer, Lockhart Power Company, Inc., 420 River Street, P.O. Box...

  20. Final environmental statement related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414, Duke Power Company, et al

    International Nuclear Information System (INIS)

    1983-01-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Catawba Nuclear Station, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR 51, as amended, of the NRC regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic-ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial

  1. 77 FR 73654 - Eau Galle Renewable Energy Company, Eau Galle Hydro, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2012-12-11

    ... Renewable Energy Company, Eau Galle Hydro, LLC; Notice of Transfer of Exemption 1. By letter filed October 12, 2012, Eau Galle Renewable Energy Company informed the Commission that its exemption from... transferred to Eau Galle Renewable Energy Company by letter.\\2\\ The project is located on the Eau Galle River...

  2. Lower Flathead System Fisheries Study, Executive Summary, Volume I, 1983-1987 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Cross, David; DosSantos, Joseph M.

    1988-06-01

    This Executive Summary, Volume I, of the lower Flathead System Fisheries Study Final Report, was prepared to provide a study overview for persons who are not fisheries scientists. The contents provide an introduction to the study and its objectives, a short description of the study area, a discussion of the major findings and conclusions of the study, and the description of fisheries management alternatives available to managers of the lower Flathead system. Technical reports were prepared for those portions of the study dealing with the lower Flathead River and its tributaries, Volume II, and the South Bay of Flathead Lake, Volume III. The annual hydrographic regime of the Flathead system, consisting of upper rivers, lake and lower river, has been modified by the construction and operation of two major hydroelectric facilities, Hungry Horse Dam on the south fork Flathead River and Kerr Dam at the outlet of Flathead Lake. The modified hydrographic regime has resulted in significant impacts to kokanee (Oncorhynchus nerka) and several species of trout. Kerr Dam, closed in 1938, controls Flathead Lake levels between 878.7 m (2883 ft) and 881.8 m (2893 ft) and discharges into the lower Flathead River. Kerr Dam is a 63.4 m (208 ft) high concrete arch structure located 7.2 km (4.5 miles) downstream from the outlet of Flathead Lake. The facility is used by Montana Power Company primarily for system frequency load control with some use for low level base load. 77 refs., 5 figs.

  3. Bull Moose Tube Company

    Science.gov (United States)

    The EPA is providing notice of a proposed Administrative Penalty Assessment against the Bull Moose Tube Company, a business located at 1819 Clarkson Road, Chesterfield, MO, 63017, for alleged violations at the facility located at 406 East Industrial Drive,

  4. Company environmental communication

    International Nuclear Information System (INIS)

    Andriola, L.; Luciani, R.; Borghini, S.

    2001-01-01

    Environmental communication is becoming a sine qua non for companies which are more and more pressed by the need to reinforce communication with interested parties: environmental groups, local communities, local and national authorities, employees, share-holders, banks, insurance companies, customers and consumers. Reliable environmental information, just like economical and property data, is now required during both company take-over and financing, and in some cases it can affect insurance premiums. In fact, environmental guarantees are more and more often required because breaching environmental regulations can entail legal sanctions going as far as suspension of business. There now also Green investment funds that engage their resources only against specific environmental guarantees on the part of the companies that, before being selected for the investment, are submitted to rather accurate questionnaires by the investment manager [it

  5. 78 FR 36658 - Safety Zone; Delaware River Waterfront Corp. Fireworks Display, Delaware River; Camden, NJ

    Science.gov (United States)

    2013-06-19

    ... portion of the Delaware River from operating while a fireworks event is taking place. This temporary...-AA00 Safety Zone; Delaware River Waterfront Corp. Fireworks Display, Delaware River; Camden, NJ AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary...

  6. Open Source Telecommunication Companies

    OpenAIRE

    Peter Liu

    2007-01-01

    Little is known about companies whose core business is selling telecommunications products that lever open source projects. Open source telecommunications (OST) companies operate in markets that are very different from typical software product markets. The telecommunications market is regulated, vertically integrated, and proprietary designs and special chips are widely used. For a telecommunications product to be useful, it must interact with both access network products and core network pro...

  7. The virtual oil company

    International Nuclear Information System (INIS)

    Garibaldi, C.A.; Haney, R.M.; Ross, C.E.

    1995-01-01

    In anticipation of continuing declines in upstream activity levels over the next 15 years, the virtual oil company model articulates a vision of fewer, leaner, but financially stronger firms that concentrate only on their core competencies and outsource the rest through well-structured partnering arrangements. Freed from the ''clutter,'' these leading companies will be in better position to focus on those opportunities that offer the potential for renewed reserve and revenue growth

  8. Approaching comparative company law

    OpenAIRE

    Donald, David C.

    2008-01-01

    This paper identifies some common errors that occur in comparative law, offers some guidelines to help avoid such errors, and provides a framework for entering into studies of the company laws of three major jurisdictions. The first section illustrates why a conscious approach to comparative company law is useful. Part I discusses some of the problems that can arise in comparative law and offers a few points of caution that can be useful for practical, theoretical and legislative comparative ...

  9. Physician-owned companies.

    Science.gov (United States)

    Kostuik, John P

    2007-05-15

    The author relates his experience in the development of a spinal implant development company (K2M) that is significantly advised by physicians. To provide information about the development of a spinal implant company (K2M) advised by a group of professional spinal surgeons. To relate the federal laws (STARK and anti-kickback) as they pertain to surgeon-influenced companies. To discuss the role of a scientific advisory board. A self-developed company was developed together with significant, but minority physician financial input and majority scientific advice. A privately owned spinal implant development corporation (K2M) was developed 3 years ago. Physician financial participation was less than 20% (Stark laws state no more than 40%). Users of product are greater than 60% non-investor physicians. The development of a large scientific advisory board has been very influential in product development. A privately owned spinal implant company (K2M) has been developed strictly within Federal laws. Its board of scientific advisors that receives recompense commissurate only with effort significantly impacts the company policy.

  10. Hazardous Waste Cleanup: Reynolds Metals Company in Massena, New York

    Science.gov (United States)

    The Reynolds Metals Company is located at 194 County Route 45 in Massena, New York. The facility has been an active aluminum production plant since 1958. The 1,600-acre facility is bordered on the north by the St. Lawrence River and on the south by the

  11. 75 FR 13524 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Science.gov (United States)

    2010-03-22

    ... Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental... notice that on March 5, 2010, Northern Natural Gas Company (Northern Natural), 1111 South 103rd Street, Omaha, Nebraska 68124- 1000, filed on behalf of itself and other owners, Southern Natural Gas Company...

  12. 76 FR 78545 - Guidance Regarding Foreign Base Company Sales Income

    Science.gov (United States)

    2011-12-19

    ... Regarding Foreign Base Company Sales Income AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Final... provide guidance relating to foreign base company sales income when personal property sold by a controlled... sales income (FBCSI) rules. Written comments were received in response to the notice of proposed...

  13. The Canadian Niagara Power Company story

    International Nuclear Information System (INIS)

    Ball, N.R.

    2005-01-01

    This book chronicles the history and contributions of the Canadian Niagara Power Company and its employees toward the establishment of electricity generation and distribution in Niagara Falls and Fort Erie, Ontario, dating back to its founding in 1892. Through historical photographs, maps and drawings, the book demonstrates the impact of electricity on the Niagara region. It emphasizes the many skills and jobs required to run the company that generated electricity and maintained a complete system to deliver power, metering, and billing services through the depression, wars, and postwar booms, even during lightning, snow and ice storms. The company began producing power in 1905 with what had been the world's largest-capacity turbines and generators that supplied power to both sides of the Niagara River. Initially, most of the electricity was exported to New York State. The company eventually expanded its Canadian customer service area from Niagara Falls, Ontario, to Fort Erie, Bridgeburg, Amigari, Ridgeway, Stevensville, Crystal Beach and Point Abino. Throughout its history, the Canadian Niagara Power Company provided power at a lower cost than its neighbouring competitors. The William Birch Rankine Generating Station became an important tourist attraction, showcasing the latest electrical appliances of the time in an effort to promote the use of electricity in homes and offices. Today, the station remains a tribute to the fact that natural beauty can coincide with industry. The book also chronicles the difficult business challenges caused by restructuring in the electric power industry in the 1990s, repairing aging equipment and applying the latest in automation and remote sensing technology. Today, the company as FortisOntario is expanding to other communities around Ontario. refs., tabs., figs

  14. Preliminary feasibility study on storage of radioactive wastes in Columbia River basalts. Volume I

    International Nuclear Information System (INIS)

    1976-11-01

    Geologic, hydrologic, heat transfer and rock-waste compatibility studies conducted by the Atlantic Richfield Hanford Company to evaluate the feasibility of storing nuclear wastes in caverns mined out into the Columbia River basalts are discussed. The succession of Columbia River Plateau flood basalts was sampled at various outcrops and in core holes and the samples were analyzed to develop a stratigraphic correlation of the various basalt units and sedimentary interbeds. Hydrologic tests were made in one bore hole to assess the degree of isolation in the various deep aquifers separated by thick basalt accumulations. Earthquake and tectonic studies were conducted to assess the tectonic stability of the Columbia River Plateau. Studies were made to evaluate the extent of heat dissipation from stored radioactive wastes. Geochemical studies were aimed at evaluating the compatibility between the radioactive wastes and the basalt host rocks. Data obtained to-date have allowed development of a hydrostratigraphic framework for the Columbia River Plateau and a preliminary understanding of the deep aquifer systems. Finally, the compilation of this information has served as a basis for planning the studies necessary to define the effectiveness of the Columbia River basalts for permanently isolating nuclear wastes from the biosphere

  15. Marketing Communication Strategies of the Industrial Companies

    Directory of Open Access Journals (Sweden)

    Wojciech Wodyński

    2007-07-01

    Full Text Available Industrial market, created by companies, which buy and sell goods which are not directly for consumption, but are used in production process, communicates with the environment in a specific way. Many industrial companies supply only the customers of non consumption goods market and hence they do not enter into direct contact with a final consumer. In such cases recognizing the customers needs is even more difficult. Such environment requires efficiently functioning and planned communication of the company with the market. This study presents methods and strategies of marketing communication really used in industrial companies. While analysing marketing strategies of industrial companies, the author draws the attention to the fact that even though there was system transformation, the state still has significant impact on functioning and development of industry and that in a way directs and created barriers in companies functioning. Such conditions force even more active marketing communication as well as searching new solutions. As there are more and more sophisticated marketing techniques related to digital media, there is also a growing demand for strategic solutions in marketing communication. Digital media, first of all the Internet, provide so far unavailable possibilities of researching consumers behaviours and ways of using media. They also give a chance to follow the behaviour of smaller, unique and often social groups of consumers.

  16. The travail of River Bend

    International Nuclear Information System (INIS)

    Studness, C.M.

    1990-01-01

    This article looks at the attempts by Gulf States Utilities to get the River Bend Nuclear Plant into its rate base. The review begins with the initial filing of rate cases in Texas and Louisiana in 1986 and continues through many court cases and appeals all the way to the Texas Supreme Court. The preferred and preference shareholders now nominally control the company through election of 10 of 15 members of the company's board of directors. This case is used as an argument for deregulation in favor of competition

  17. Countries and companies

    International Nuclear Information System (INIS)

    Jenning, J.S.

    1990-01-01

    The trends and factors currently emerging are likely to have significant influence on the way the upstream oil and gas industry evolves in the coming decade. This paper discusses how these trends might influence events in the 1990s, particularly how they might influence relationships between host countries and companies in the oil industry. State owned companies will dominate the industry in resource terms. These statcos fall into three groups: a small group of technically able, financially sound, well-managed companies; a group of consumer statcos that have limited domestic production but significant domestic demand; a large group that are finding it difficult to maintain their production facilities in good standing to maximize recovery from their resources. This paper describes the future private sector as consisting of the Surviving Sisters and smaller, private companies very active in the upstream. How will these various players behave in the years to come? Conventional activity in the upstream will continue as companies seek to optimize their upstream portfolios

  18. Company X launch to the Chinese market

    OpenAIRE

    Gilles, Mylene

    2012-01-01

    The purpose of this thesis was to conduct a brand study for Company X, which pro-duces small and medium childcare products. The final objective was to have a better knowledge of the Chinese market to adapt as well as possible the Company X brand strategy comparing with competitors are doing in terms of brand strategy and entry mode solution. The introduction shows the purpose and the objectives of the thesis and the concep-tual framework including all the theoretical concepts developed. Th...

  19. Significance of Kaduna River to Kaduna Refining and ...

    African Journals Online (AJOL)

    User

    River through the Kaduna Refining and Petrochemicals Company (KRPC) plants and .... Other less-common process involves filtering heated crude using diatomaceous earth ..... Water is polluted by the fallout from air pollution and by refinery.

  20. 77 FR 68115 - Millennium Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-11-15

    ...] Millennium Pipeline Company, L.L.C.; Notice of Application Take notice that on November 1, 2012, Millennium Pipeline Company, L.L.C. (Millennium), One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl River, New... system to the existing interconnection with Algonquin Gas Transmission, L.L.C. in Ramapo, New York and...

  1. 75 FR 21286 - Bowersock Mills and Power Company; Notice of Application Accepted for Filing, Soliciting Motions...

    Science.gov (United States)

    2010-04-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13526-002] Bowersock Mills... License. b. Project No.: 13526-002. c. Date Filed: February 8, 2010. d. Applicant: Bowersock Mills Power Company (Bowersock). e. Name of Project: Bowersock Mills and Power Company Expanded Kansas River...

  2. 78 FR 61958 - New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2013-10-08

    ... Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 20, 2013, the New England Hydropower Company... river are owned by the city of Meriden. Applicant Contact: Mr. Michael C. Kerr, New England Hydropower...

  3. River nomads

    DEFF Research Database (Denmark)

    2016-01-01

    sail on the Niger River between Nigeria and Mali. Crossing villages, borders and cultures, they stop only to rest by setting up camp on riverbanks or host villages. In River Nomads, we join the nomadic Kebbawa fishermen on one of their yearly crossing, experiencing their relatively adventurous...

  4. River Piracy

    Indian Academy of Sciences (India)

    There was this highly venerated river Saraswati flowing through. Haryana, Marwar and Bahawalpur in Uttarapath and emptying itself in the Gulf ofKachchh, which has been described in glowing terms by the Rigveda. "Breaking through the mountain barrier", this "swift-flowing tempestuous river surpasses in majesty and.

  5. Hudson River cooling tower proceeding: Interface between science and law

    International Nuclear Information System (INIS)

    Bergen, G.S.P.

    1988-01-01

    As the Hudson River power plant case proceeded, the regulatory ground shifted under the utility companies. At first, the US Environmental Protection Agency (EPA) contended that the utilities should build expensive closed-cycle cooling towers at three plants to minimize the plants' discharge of heated effluents to the river. When the formal hearing began, however, EPA claimed that cooling towers were needed to minimize the number of organisms impinged at and entrained through the plants. The Hudson River proceeding became a policy dispute over what the appropriate standard of environmental conduct should be, instead of a determination of whether a standard had been met or not. Such policy issues, which arise when legal precedent has yet to be developed for new laws like the Clean Water Act, are better addressed by a rule-making proceeding than by the adjudicatory hearing format used in the Hudson case. A rule-making proceeding would have markedly shortened the Hudson deliberations, probably without substantive change in the final settlement, and is recommended for future cases in which ambiguity in legislation or the lack of precedent has left policy matters unresolved. 2 refs

  6. Companies as "Cyborgs"?

    DEFF Research Database (Denmark)

    Thompson, Grahame

    This paper investigates the legal and commercial consequences of companies being considered as both an entity and a person in law – hence the notion of ‘cyborg’ in its title. It concentrates upon legal personhood and relates this particular feature to the issue of corporate citizenship. In turn...... corporate citizenship provides a link to considering the political role of companies, since in claiming citizenship they are implicitly at least claiming a particular set of political rights consequent upon that status, and announcing a particular politically constrained context associated...... with their operational characteristics. But what would be involved in granting companies full citizenship rights in the image of natural person citizenship? The paper explores this issue in connection to the differences between corporate social responsibility and an earlier idea of the socially responsible corporation...

  7. Chinese Companies in Switzerland

    Directory of Open Access Journals (Sweden)

    Esther Kessler

    2014-10-01

    Full Text Available In recent years, some of China’s leading firms have made headlines with their European expansion, by either opening new facilities or by acquiring or merging with significant enterprises in Europe. The goal of this paper is to contribute to the existing literature by examining Chinese enterprises expanding into Switzerland. The study also allows some conclusions for Chinese companies entering Central and Eastern Europe. We analyze via interviews the motivations of Chinese companies to expand into Switzerland as well as their behavior and the impediments in their internationalization process. Our findings show that Chinese companies fail to take advantage of certain benefits of western economies (such as open information and stable rule of law. To move forward efficiently, they should develop competence in dealing systematically with readily available market information, building professional networks that recognize a separation between business life and personal life, and managing their Chinese and foreign employees in the foreign cultural environment.

  8. RESTRUCTURING COMPANIES UNDER CRISIS

    Directory of Open Access Journals (Sweden)

    Hezi Aviram SHAYB

    2016-12-01

    Full Text Available Nobody is planning to fail, but many companies are failing because of lack of planning. Real business experience showed during the years that crisis can be prevented, avoided or limited. If detected in time, the risks associated with the crisis can be mitigated and the effects can be diminished, with the condition that the actions required are done fast, in a sharp and accurate manner. When it comes, a crisis brings an intense level of pressure and under these conditions there is no time or room for mistakes. Delays, losing focus and lack of planning will bring a company one step away from failure. The right way to deal with crisis, if required measures are not done in time, is to minimize the losses and reposition in the best way possible. Analysing the success stories of some of the biggest and strongest companies in the world, led to an important conclusion: the majority of these companies were in the situation to face huge crises which threatened their ability to survive in certain moments, on their way to success. With the right planning and by setting a proper organisational structure, the negative aspects of the crisis can be turned into benefits and opportunities for the company. The most critical challenge for management is to assess the level of exposure to risk of the company and identify the key points to focus on in order to overcome the crisis and create value. In order to set up a strong plan in dealing with crisis, a business organisation needs reliable, efficient and effective tools and this is what this article is all about.

  9. PREVENTION OF COMPANY RISKS

    Directory of Open Access Journals (Sweden)

    SUCI U GHEORGHE

    2014-10-01

    Full Text Available A company’s manager has to create and maintain a healthy internal control system. An efficient internal control system implies the implementation in the company of risk management. Each company, but also each individual, who tries to attain certain objectives, establishes the activities which lead to the achievement of goals and, at the same time, tries to identify as many “threats” as possible, in order to take the necessary measures to eliminate them. Thus, even if one is not familiar with the concepts of risk and risk management, one acts, consciously or not, for that purpose.

  10. COMPANY ACTIVITY FINANCIAL RISK

    Directory of Open Access Journals (Sweden)

    Caruntu Genu Alexandru

    2012-12-01

    Full Text Available In economic and financial activity, risk is an inherent financial decisions, encountered in daily agenda of managers of companies. Unexpected changes in the price of a product development not only affect the financial results of a company, but can cause even bankruptcy. In fact, the nature of financial decisions involve uncertainty. Financial decisions are made based on cash flows under future contracts, which are par excellence incerte.Activitatea an enterprise that holds any weight in the industry is subject to risks, since it can not predict with certainty different components of its outcome (cost, quantity, price and operating cycle (purchase, processing, sales.

  11. Oil Companies Climb Global List

    Institute of Scientific and Technical Information of China (English)

    JESSY ZHANG

    2006-01-01

    @@ Backed by the huge market size,China's energy companies have been ranked in the group of the world's largest industry players. On September 6th,eight companies from the Chinese mainland and six companies from Hong Kong SAR were included in this year's Platts Top 250 Energy Companies List.

  12. Study on Municipal Energy Companies

    International Nuclear Information System (INIS)

    2009-07-01

    This is a summarizing overview of the local, renewable energy initiatives that are grouped under the heading of 'municipal energy company'. A municipal energy company (or sustainable energy company) is a local energy company that initiates, coordinates and/or manages sustainable energy projects with the primary objective of realizing the climate objectives. [nl

  13. Company Town Shutdown.

    Science.gov (United States)

    Turnage, Martha A.

    Saltville, Virginia, is a former company town whose main employer, a soda ash plant, shut down on July 1, 1971. The closure of the chemical plant displaced 700 workers, and created a crisis that threatened not only the existence of the town, but of the entire region. In response, Virginia Highlands Community College (VHCC), in cooperation with the…

  14. Final Determination - signed March 1, 1990

    Science.gov (United States)

    Final Determination of the U.S. Environmental Protection Agency's Assistant Administrator for Water pursuant to Section 404(c) of the Clean Water Act concerning the proposed Big River water supply impoundment in Kent county, RI.

  15. Finnish company interested in Slovak spruce trees

    International Nuclear Information System (INIS)

    Haluza, I.; Slovak, K.

    2005-01-01

    Following the large-scale investments by major car plants in Slovakia, another large investment is the subject of negotiations in another sector. One of the largest international paper mills - Finish company, Myllykoski, is interested in Slovakia. Should negotiations be successful, the company would build a cellulose plant in Slovakia. This plant would cost around 500 mil. EUR (19 bill. Slovak crowns) and would process around 600,000 cubic meters of wood a year - about 10% of Slovakian's annual production. Head of the SARIO investment agency, Roman Kuruc, formally confirmed that discussions TREND learned about from potential suppliers of wood were indeed taking place. 'Negotiations are in progress with this company, but no final decision has been taken. As was the case with other major projects in the past, we must compete with neighbouring countries,' said R. Kuruc. But he confirmed that Trend's information regarding the total value of the investment was more or less accurate. Taking into account the volume of coniferous wood available, Poland and the Czech Republic can be considered to be the major competitors of Slovakia. Statements from the Myllykoski Group have been cautious up to now. 'We always take an active approach to seeking new opportunities and so we cannot confirm whether we are looking for new opportunities in Slovakia. What I can confirm is that our company has not made any decision about new investments recently,' said Taru Tuoresmaki from the Secretariat of the President and company Executive Vice-President

  16. Oil companies and village development in Nigeria

    International Nuclear Information System (INIS)

    Ikporukpo, C.O.

    1993-01-01

    The economic interest of oil companies and the oil-producing Third World countries, together with the technological handicaps and political considerations of the latter, provide the scenarios within which the two groups interact. In the early history of oil exploitation, the relationship was such that the oil companies had the final say in all matters. Furthermore, apart from the token royalty, no taxes were usually imposed on the exploration companies. The relationship between the oil companies and the host local communities, even in the developed countries, seems to be a replica of that between the companies and the host countries. There is the feeling in many of the local communities that they have gained little or nothing from petroleum exploitation. This is the case not only in the setting of a less developed country, such as Nigeria, but also in that of a developed country, such as the United States. In these communities, the adverse environment effect of oil exploitation is usually perceived as being overwhelming. (author)

  17. Piercing of corporate veil of nuclear companies

    International Nuclear Information System (INIS)

    Frenz, Walter

    2015-01-01

    The Federal Ministry of Economics plans that the nuclear companies with all their assets to cover disposal costs can be used where a power plant operator is governed by its parent company, hence the latter Capital or voting majority of the operators holding or these passes; To date, the parent company is liable only limited and not more than five years after the end of the domination of one Subsidiary, oparating a power plant. In this way, prevents ultimately the public sector and thus the Taxpayers have to pay for the long-term consequences of the use of nuclear energy. Until now ensured paragraph 303 AktG a group law Secondary liability the parent companies of the operating company in the case of of termination of the control and profit transfer agreements is very limited for the nuclear liabilities, namely in two ways: The claim is only focused on the backup performance and not at the expense of acquisition and Moreover, according to the case law limited of five years after its foundation; for the area of transformation law comparable rules are valid. thereby the dismantling of a nuclear power station takes just already for 20 years and a final repository is expected before 2050 not be available. [de

  18. The science and practice of river restoration

    Science.gov (United States)

    Wohl, Ellen; Lane, Stuart N.; Wilcox, Andrew C.

    2015-08-01

    River restoration is one of the most prominent areas of applied water-resources science. From an initial focus on enhancing fish habitat or river appearance, primarily through structural modification of channel form, restoration has expanded to incorporate a wide variety of management activities designed to enhance river process and form. Restoration is conducted on headwater streams, large lowland rivers, and entire river networks in urban, agricultural, and less intensively human-altered environments. We critically examine how contemporary practitioners approach river restoration and challenges for implementing restoration, which include clearly identified objectives, holistic understanding of rivers as ecosystems, and the role of restoration as a social process. We also examine challenges for scientific understanding in river restoration. These include: how physical complexity supports biogeochemical function, stream metabolism, and stream ecosystem productivity; characterizing response curves of different river components; understanding sediment dynamics; and increasing appreciation of the importance of incorporating climate change considerations and resiliency into restoration planning. Finally, we examine changes in river restoration within the past decade, such as increasing use of stream mitigation banking; development of new tools and technologies; different types of process-based restoration; growing recognition of the importance of biological-physical feedbacks in rivers; increasing expectations of water quality improvements from restoration; and more effective communication between practitioners and river scientists.

  19. Financial Structure Analysis of Publicly Held Lodging Companies: An International Comparison

    Directory of Open Access Journals (Sweden)

    Erdinç KARADENİZ

    2015-12-01

    Full Text Available The aim of this study is to analyze financial structure and preference of lodging companies that issues traded in European and Turkish stock markets by using ratio analysis technique. In this context, statements of financial positions of 51 lodging companies from European stock markets and 12 lodging companies from Borsa Istanbul used and calculated 10 financial structure ratios for each company between 2011-2012-2013 years. In the results of ratio analysis, it is determined that Turkish lodging companies use mainly equity while European lodging companies prefer liabilities and debt to finance their activities. In respect to maturity of liabilities it is determined that European lodging companies prefer long term debt while Turkish lodging companies use short term liabilities. Finally, it is determined that European lodging companies use leasing but no Turkish lodging companies to choose leasing.

  20. Scottish Nuclear, the company

    International Nuclear Information System (INIS)

    Yeomans, R.M.

    1991-01-01

    A former chief executive of Scottish Nuclear, formed when United Kingdom electricity generation was privatized, describes the financial viability of the company and considers the future of nuclear power. Scottish Nuclear owns and operates the Advanced Gas Cooled (AGR) and Magnox reactors at Hunterston and the AGR reactor at Torness and is a separate company from those dealing with hydro-electric and non-nuclear generation of electricity. Costs of running the reactors is identified as a proportion of the whole for certain key issues such as station costs, depreciation, decommissioning and insurance. While nuclear power generation using outmoded Magnox reactors is costly, the ecological cost of global warming is seen as more of a problem. Future policy for nuclear power in Scotland must include new plant, probably pressurized water reactors and a clear policy of safety enhancement. (UK)

  1. Company cases Denmark

    DEFF Research Database (Denmark)

    Tølle, Martin; Pedersen, Jørgen Lindgaard

    2005-01-01

    for government sector in Denmark. DC employed 1,000 persons and had a market share on 75 % in the market of large government institutions when it was taken over. Danish government wanted to sell DC in order to get more intensity in competion in IT - markets in general and especially in the market for public...... IT - solitions. CSC wanted to buy DC to penetrate the Nordic market. Some effects can be mentioned: Employment in CSC - DK is in 2003 1,700 persons or 2,600 including other companies bought up recently. In innovation positive effects can be registered from contacts with CSC - International. Not only from access...... - Laboratoriet, Benzon - Pharma and Pharma - Medica during years 1988 - 1991.Nycomed wants to establish itself as a company on European level.After a decade with different owners, fusions and splitting ups a construction in which head quarter and R&D move to Denmark close to Copenhagen. The importance...

  2. Happy oil companies

    International Nuclear Information System (INIS)

    Maincent, G.

    2009-01-01

    The decay of demand, the bad financial results of the first half of 2009 and the hypothetical depletion of reserves must not hide a reality: oil companies are passing through the economic crisis without much trouble. Even if profits have marked time in volume (-57% for BP, -65% for Shell..), the net margins have not significantly suffered and the available cash remains comfortable (14 billion euros for Total as an example). The perspectives offered by the new offshore sites (like Santos in Brazil) added to the fabulous promises of the Iraqi market where 'majors' can now make their come-back will be the key of success of oil companies. The overall exploration-production investments should start up again by the beginning of 2011. For the only offshore drilling domain, they should rise up by 32% during the 2009-2013 period which represents a sum of 367 billion dollars. (J.S.)

  3. The Balanced Company

    DEFF Research Database (Denmark)

    through control or trust. Human resource specialists need to make balanced decisions about how to design tasks and jobs in order to make them attractive as well as motivating. Marketers need to make balanced decisions about how to market products in the light of what is now important in consumers...... in their environments. Communication specialists need to make balanced decisions which take the different value systems and assumptions of stakeholders into consideration. Change specialists need to balance the need for continuity and change. Managers need to make balanced decisions about whether to achieve goals...... the creation and recreation of balanced relationships. Chapters in The Balanced Company ask and provide answers to questions about corporately responsible and ethically driven balanced decision making, such as: • How can a company and its stakeholders identify what should be taken into consideration - What...

  4. Oil companies make cutbacks

    International Nuclear Information System (INIS)

    Dupin, Ludovic

    2014-01-01

    As oil prices are falling, the oil sector faces company restructuring, merger projects, closure of oil fields, and so on. Restructuring is motivated by the costs of offshore exploration and oil production projects. Saudi Arabia tries to fight the emergence of shale gases by reducing oil prices, and somehow succeeds as some projects in the USA are put into question again. Experts perceive this situation as an opportunity for the sector to improve its efficiency and reduce over-staffing

  5. Building Company Loyalty System

    OpenAIRE

    Haniková, Alžběta

    2010-01-01

    The thesis discusses the importance of loyal customers, and loyalty system as a tool for building loyalty. It defines loyalty and customer satisfaction, it deals with the issue of customer retention. It describes the history and types of loyalty programs, important factors for deciding on their implementation and problems associated with them. The practical part is concerned with the clothing market, Orsay company and its Orsay Club loyalty systeme. The work also includes a survey of the loya...

  6. Tax optimization of companies

    OpenAIRE

    Dědinová, Pavla

    2017-01-01

    This diploma thesis deals with tax optimization of companies. The thesis is divided into two main parts - the theoretical and practical part. The introduction of the theoretical part describes the history of taxes, their basic characteristics and the importance of their collection for today's society. Subsequently, the tax system of the Czech Republic with a focus on value added tax and corporation tax is presented. The practical part deals with specific possibilities of optimization of the a...

  7. Zenn Motor Company

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, I. [Zenn Motor Company, Toronto, ON (Canada)

    2010-07-01

    Zenn Motor company is a leader in the electric vehicle space and builds and markets a low speed vehicle known as the zero emission, no noise (ZENN). This presentation provided background information on the Zenn Motor Company as well as on EEStor, a company that develops four-wheeled vehicles and that is seeking partners to fund the development for a modified barium titanate-based ultracapacitor. In 2004, ZENN entered into a technology agreement with EEStor that secured certain exclusive and non-exclusive rights to purchase and deploy EEStor's EESU technology as part of its ZENNergy solutions in several markets, including exclusive rights for new four-passenger vehicles with a curb weight of up to 1,400 kilograms; exclusive rights for the neighbourhood electric vehicles (NEV) and golf carts market; exclusive rights for utility vehicles; and exclusive rights for the aftermarket conversion to ZENNergy of any four-wheeled vehicles. The presentation also addressed ZENNergy and the art of integrating high energy drive solutions. Lessons learned and EEStor's technology attributes were discussed. A hypothetical case study was also offered. The presentation concluded with a discussion of EEStor technology status and opportunity horizons. It was concluded that a better battery is needed to enable the mass adoption of electric vehicles. tabs.

  8. Company Vision and Organizational Learning

    Directory of Open Access Journals (Sweden)

    Vojko Toman

    2015-11-01

    Full Text Available The effectiveness of a company is largely dependent on the company itself; it depends above all on its corporate governance, management, and implementation, as well as on decision-making processes and coordination. Many authors believe that organizational learning and knowledge are the most relevant aspects of company effectiveness. If a company wants to be effective it needs to create and realize its vision; to do this, it needs creativity, imagination, and knowledge, which can be obtained or enhanced through learning. This paper defines vision, learning, creativity and management and, above all, their relationships. The author argues that company vision influences the learning and knowledge of employees in the company through the vision’s content, through the vision-creating process, and through the vision enforcement process. Conversely, the influence of learning on company vision is explained. The paper is aimed at the use in the practice of companies and helps them to increase their effectiveness.

  9. Risk Management in Insurance Companies

    OpenAIRE

    Yang, Xufeng

    2006-01-01

    Insurance is the uncertain business in uncertain society. Today, insures face more complex and difficult risks. Efficient risk management mechanisms are essential for the insurers. The paper is set out initially to explore UK insurance companies risk management and risk disclosure by examining companies annual report after all the listed insurance companies are required to disclose risk information in their annual report, which seeks to reflect the recent development in UK insurance companies...

  10. Organizational architecture of multinational companies

    OpenAIRE

    Sikorová, Lenka

    2009-01-01

    The main goal of the bachelor thesis Organizational Architecture of Multinational Companies is to elaborate the overview of organizational structures that are used by modern global companies. The thesis contains an analysis of such companies development, principles of functioning, pros and cons and the opportunities which these brings. It also contains a description of the basic concepts associated with organizational architecture such as globalization, multinational companies and organizatio...

  11. Strategy Assessment of Company ECOPOSTES

    OpenAIRE

    Cortazar Sanabria, Javier Mauricio

    2015-01-01

    This thesis focuses on developing a research on the different types of strategies a company can implement depending on their situation and the various analyses that must be completed before making the strategy decision. External and internal environment methods are described together with the various forms of corporate restructure methods a company can use if needed. The whole process is followed step by step to provide a strategy assessment to company Ecopostes, a Colombian company focused o...

  12. White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume III, Appendix B, Fisheries Report; Appendix C, Engineering Alternative Evaluation; Appendix D, Benefit/Cost Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest (Or.)

    1985-06-01

    Studies were conducted to describe current habitat conditions in the White River basin above White River Falls and to evaluate the potential to produce anadromous fish. An inventory of spawning and rearing habitats, irrigation diversions, and enhancement opportunities for anadromous fish in the White River drainage was conducted. Survival of juvenile fish at White River Falls was estimated by releasing juvenile chinook and steelhead above the falls during high and low flow periods and recapturing them below the falls in 1983 and 1984. Four alternatives to provide upstream passage for adult salmon and steelhead were developd to a predesign level. The cost of adult passage and the estimated run size of anadromous fish were used to determine the benefit/cost of the preferred alternative. Possible effects of the introduction of anadromous fish on resident fish and on nearby Oak Springs Hatchery were evaluated. This included an inventory of resident species, a genetic study of native rainbow, and the identification of fish diseases in the basin. This volume contains appendices of habitat survey data, potential production, resident fish population data, upstream passage designs, and benefit/cost calculations. (ACR)

  13. IMPLEMENTATION OF QUALITATIVE RULES IN COMPANY`S INFORMATION MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Anna WOLNOWSKA

    2012-07-01

    Full Text Available In the article there were presented chosen issues of quality management. Important role of information and work processes in companies were emphasized . Based on eight rules of quality management, TQM standards and ideas of discipline pioneers like Deming, Juran, Crosby and Shewart, author has constructed way of using chosen rules and assumptions to company`s information circulation. Analogy, suggested by author, has not only emphasized importance of information as a company`s resource, but also has pointed to possibility of improving ways of managing this information.

  14. Systematic approach to modernizing the production company

    Directory of Open Access Journals (Sweden)

    Irina Valeryevna Makarova

    2011-06-01

    " grocery modernization was determined as a priority goal. The authors have developed a model of economic efficiency of each final product in terms of operating profitability and the investment component of production (optimal allocation of investments. To simplify the solution of problems of technical and product upgrading, it was suggested to join them in the task of business units. This enabled us to present the company as an economic system with a hierarchical management structure centered on the resources distribution point. The proposed systemic approach can be considered as a methodological basis for the modernization of a production company.

  15. National companies : performance, ventures, utility

    International Nuclear Information System (INIS)

    Didier, F.

    1994-01-01

    The author shows how a performing National Company can efficiently contribute, in line with the producing State, to the negotiation with International Companies and the success of large oil ventures contemplated by reserves-short countries. Fully entrepreneurial, the National Company will usefully ''explore'' touchy matters, and bring closer national rationale and petroleum rationale. (Author)

  16. Multilingualism in Companies: An Introduction

    Science.gov (United States)

    Sherman, Tamah; Strubell, Miquel

    2013-01-01

    This thematic collection of four papers explores a number of perspectives on companies in which multiple languages are used. The "organisational" perspective concerns the question of how the presence of or demand for multiple languages in the company is managed--how companies are guided by national and other policies in regard to the use…

  17. Organizational architecture of multinational company

    OpenAIRE

    Vrbová, Tereza

    2012-01-01

    The Bachelor's Thesis ,,Organizational architecture of multinational company" sets the target to analyse organizational structures used in multinational companies at present. In the teoretical section is briefly described development of this subject, basic concepts associated with organizational architecture such as globalization, multinational companies and organizational architecture. I also generalized main characteristics of organizational forms and describe their pros and cons. The pract...

  18. 78 FR 3470 - DTE Electric Company (Formerly the Detroit Edison Company), Notice of Availability of Final...

    Science.gov (United States)

    2013-01-16

    ...--specific Web page at http://www.nrc.gov/reactors/new-reactors/col/fermi.html . The Ellis Library and... possesses and are publicly-available, using any of the following methods: Federal Rulemaking Web site: Go to... Documents Access and Management System (ADAMS): You may access publicly-available documents online in the...

  19. 76 FR 29645 - Safety Zone, Newport River; Morehead City, NC

    Science.gov (United States)

    2011-05-23

    ...-AA00 Safety Zone, Newport River; Morehead City, NC AGENCY: Coast Guard, DHS. ACTION: Temporary final... the main span US 70/Morehead City--Newport River high rise bridge in Carteret County, NC. This safety... Zone, Newport River; Morehead City, North Carolina in the Federal Register (33 FR 165). We received no...

  20. 76 FR 38018 - Safety Zone, Newport River; Morehead City, NC

    Science.gov (United States)

    2011-06-29

    ...-AA00 Safety Zone, Newport River; Morehead City, NC AGENCY: Coast Guard, DHS. ACTION: Temporary final... the main span US 70/Morehead City-Newport River high rise bridge in Carteret County, NC. This safety...) entitled Safety Zone, Newport River; Morehead City, North Carolina in the Federal Register (33 FR 165). We...

  1. Management of Fishery Resources in Yangtze River Estuary

    OpenAIRE

    Li, Meiling; Huang, Shuolin

    2009-01-01

    We introduce the fish fauna composition and main commercial fishes in Yangtze River estuary. We also analyze the current situation of resources and environment in Yangtze River estuary as well as the influential factors. Finally, related countermeasures are put forward on how to protect and use the fishery resources in Yangtze River.

  2. Flood Control Minnesota River, Minnesota, Mankato-North Mankato-Le Hillier. Design Memorandum Number 8. Part I. Location Study and Draft Supplement II to the Final Environmental Impact Statement for Bridge Relocations. Main Street, Trunk Highways 60 Bridge over the Minnesota River between Mankato and North Mankato.

    Science.gov (United States)

    1981-06-01

    topography or in rugged terrain, majur road overcrossings may be attainable only by a forced alinement and rolling gradeline. Where there otherwise...Wisconsin PCB Interagency Task Force in 1976 indicated that the game fish in the Minnesota River near Mankato have higher polychlorinated biphenyl (PCB...Highway River Structures Job Sum 5,920,000.00 TOTAL BRIDGES $6,875,000.00 TOTAL ROADWAY AND BRIDGES $11,674,000.00 Force Accounts CNW T. Co. Track Removal

  3. CSR in TSL companies

    Directory of Open Access Journals (Sweden)

    Joanna DYCZKOWSKA

    2015-03-01

    Full Text Available TSL companies are characterized by high dynamics of an increase of incomes, and hence increased shipping. Owing to a rational policy in the area of the consolidation of production and distribution, they may boast of a better use of the means of transport. The purpose of this article is to present the activities in the area of the eco-friendly CSR aspect in the activities of TSL companies taking into consideration particularly logistic operators. The research methods used in the study include an analysis of secondary data, observations and comparative analyses. Road transport in the shipping structure comes first and it constitutes 84% of freights. In the year 2009, in Poland greenhouse gas emissions from road transport amounted to 42.5 million tons (4.84% of the EU member states and CO emissions were 41.9 million tons (analogically, 4.83% of environment pollutions in the European Union. This causes an emission of fumes into the atmosphere. The policy of sustainable development pursued by logistic operators under corporate social responsibility is a response to the abovementioned data. They take decisions concerning social and environmental aspects. The activities of TSL companies under CSR need to provide an answer to customer expectations and needs, and they have to cause an increase of competitiveness on the market. The selected four largest logistic operators conduct the following eco-friendly activities on the highest level: fume emission reports and the control of these emissions, transport of hazardous goods (ADR, voluntary services in the scope of environmental protection and cooperation with eco-friendly organizations. There are those activities which call for improvement: a limitation of the emission of fumes, waste management and sewage treatment policy.

  4. Contribution of service companies

    International Nuclear Information System (INIS)

    Sole, L. M.; Cortes, A.

    2002-01-01

    The most influential aspect when choosing the model of contract between Client and Contractor relapses into the maturity reached by both parts. The service supplier will have to show his competence with his resume, not only technical, but also of actual actions concerning availability reliability, maintainability, security, environment and costs. That maturity may have been the reason why most of the service companies, of national scope, that carry out maintenance of nuclear power stations electricity and instrumentation nowadays, are present from the assembly and implementation phases of these nuclear power stations. (Author)

  5. Reading and company

    DEFF Research Database (Denmark)

    Kuzmičová, Anežka; Dias, Patrícia; Vogrinčič Čepič, Ana

    2017-01-01

    in the environment where one engages in individual silent reading. The primary goal of the study was to explore the role and possible associations of a number of variables (text type, purpose, device) in selecting generic (e.g. indoors vs outdoors) as well as specific (e.g. home vs library) reading environments....... Across all six samples included in the study, participants spontaneously attested to varied, and partly surprising, forms of sensitivity to company and social space in their daily efforts to align body with mind for reading. The article reports these emergent trends and discusses their potential...

  6. Balance model of masses for mercury and cyanide in the Surata River

    International Nuclear Information System (INIS)

    Amaya S, Cesar Jovane

    2004-01-01

    The pattern of masses balance consists of a comparison through the time of pollutants quantity (mercury and cyanide) poured in the mining region of Vetas and California, with the values of these same pollutants detected in the Bosconia plant of the metropolitan aqueduct of Bucaramanga. The mercury and the cyanide are used in the mining region for the gold benefit and they already arrive as residuals to the air sources and to the water that arrives to Surata River, one of the sources of supply of drinkable water of the aqueduct. In the gold benefit in the region, two different groups work:; the mining companies and the barrileros. The barrileros is particular people that work mainly the amalgamation of the mineral in barrels, and they discard their residuals to the environment, the same as the mining companies. The mining companies of California pour their residuals in the gulch La Baja, above of the monitoring point LB-01 (Round Hill) of the CDMB; as long as the mining companies of Vetas, pour them above of the monitoring point RV-05 (Borrero) also of the CDMB, to the River Vetas. Few data exist on the used of mercury and cyanide quantities through the time for the mining companies and the barrileros. In the monitored points of the CDMB, RV-02 and LB-01 (Round Hill), it is had temporary registrations of so much of concentrations of mercury and total cyanide in the water, as well as of flows. In the plant Bosconia registers concentrations of mercury and cyanide in the water of the Surata River every two hours daily, as long as the data of flows are measured in the point MA-01 (Majadas) By means of the flow multiplication and concentration they can register the masses of mercury and cyanide that happen at one time determined by the sampling points. A very simple balance of masses is obtained measuring in the different sampling points the masses of mercury and cyanide poured in the mining region. In the ideal case all the data required should exist in with a high

  7. The European Model Company Act

    DEFF Research Database (Denmark)

    Cleff, Evelyne Beatrix

    2011-01-01

    European Company Law regulation is currently undergoing a reform. These reforms raise a number of regulatory questions, such as what should be the aims of companies' legislation, and how these aims should best be met by regulation. Many of the reforms and discussions (both on EU and national level...... an increasing influence on the framing of company legislation, such as the choice between mandatory or default rules. This article introduces the project 'European Company Law and the choice of Regulatory Method' which is carried out in collaboration with the 'European Model Company Act Group'. The project aims...

  8. HANFORD SITE RIVER CORRIDOR CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.

    2006-01-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km 2 Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal

  9. Company Profile: Selventa, Inc.

    Science.gov (United States)

    Fryburg, David A; Latino, Louis J; Tagliamonte, John; Kenney, Renee D; Song, Diane H; Levine, Arnold J; de Graaf, David

    2012-08-01

    Selventa, Inc. (MA, USA) is a biomarker discovery company that enables personalized healthcare. Originally founded as Genstruct, Inc., Selventa has undergone significant evolution from a technology-based service provider to an active partner in the development of diagnostic tests, functioning as a molecular dashboard of disease activity using a unique platform. As part of that evolution, approximately 2 years ago the company was rebranded as Selventa to reflect its new identity and mission. The contributions to biomedical research by Selventa are based on in silico, reverse-engineering methods to determine biological causality. That is, given a set of in vitro or in vivo biological observations, which biological mechanisms can explain the measured results? Facilitated by a large and carefully curated knowledge base, these in silico methods generated new insights into the mechanisms driving a disease. As Selventa's methods would enable biomarker discovery and be directly applicable to generating novel diagnostics, the scientists at Selventa have focused on the development of predictive biomarkers of response in autoimmune and oncologic diseases. Selventa is presently building a portfolio of independent, as well as partnered, biomarker projects with the intention to create diagnostic tests that predict response to therapy.

  10. Company competencies as a network: The role of product development

    DEFF Research Database (Denmark)

    Harmsen, Hanne; Grunert, Klaus G.; Bove, Karsten

    2000-01-01

    investigate these matters in a survey with top managers in 513 Danish production companies. Ten areas important for achieving company objectives are identified. These are product development, market intelligence, production management, strategy and vision, sales, market responsiveness, promotion, internal co......-operation, image, and finally supply management. Product development is rated a fairly important competence as it ranks four with sales, market responsiveness, and production management as numbers one to three. Yet a distressing negative impact on overall company success is found for product development......Product development managers and academics like to assure themselves and each other that new product development is one of the most critical areas of company competence and contributes positively to company success But does top management agree? Because if they do not, the consequences will heavily...

  11. Increased Levels of Harvest and Habitat Law Enforcement and Public Awareness for Anadromous Salmonids and Resident Fish in the Columbia River Basin -- Demonstration Period, 1992--1994, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    NeSmith, Frank (Idaho Department of Fish and Game, Boise, ID); Long, Mack (Montana Department of Fish, Wildlife and Paks, Kalispell, MT); Matthews, Dayne (Washington Department of Fish and Wildlife, Olympia, WA)

    1995-06-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin.

  12. Aerial gamma ray and magnetic survey, Powder River II Project: the Newcastle and Gillette Quadrangles of Wyoming and South Dakota; the Ekalaka Quadrangle of Montana, South and North Dakota. Volume I. Final report

    International Nuclear Information System (INIS)

    1979-04-01

    During the months of August through September 1978, geoMetrics, Inc. flew approximately 9000 line miles of high sensitivity airborne radiometric and magnetic data in eastern Wyoming and southern Montana over three 1 0 x 2 0 NTMS quadrangle (Newcastle, Gillette, and Ekalaka) as part of the Department of Energy's National Uranium Resource Evaluation program. All radiometric and magnetic data were fully reduced and interpreted by geoMetrics, and are presented as four volumes (one Volume I and three Volume II's) in this report. The survey area lies entirely within the northern Great Plains Physiographic Province. The deep Powder River Basin and the Black Hills Uplift are the two dominant structures in the area. Both structures strike NNW approximately parallel to each other with the Powder River Basin to the west of the Uplift. The Basin is one of the largest and deepest in the northern Great Plains and contains over 17,000 feet of Phanerozoic sediments at its deepest point. Economic deposits of oil, coal, bentonite and uranium are found in the Tertiary and/or Cretaceous rocks of the Basin. Gold, silver, lead, copper, manganese, rare-earth elements and uranium have been mined in the Uplift. Epigenetic uranium deposits lie primarily in the Monument Hills - Box Creek and Pumpkin Buttes - Turnercrest districts within arkosic sandstones of the Paleocene Fort Union Formation. A total of 368 groups of statistical values in the uranium window meet the criteria for valid anomalies and are discussed in the interpretation sections (83 in Newcastle, 109 in Gillette, and 126 in Ekalaka). Most anomalies lie in the Tertiary sediments of the Powder River Basin, but only a few are clearly related to known uranium mines or prospects. Magnetic data generally delineate the deep Powder River Basin relative to the Black Hills Uplift. Higher frequency anomalies appear related to producing oil fields and mapped sedimentary structures

  13. Aerial gamma ray and magnetic survey, Powder River II Project: the Newcastle and Gillette Quadrangles of Wyoming and South Dakota; the Ekalaka Quadrangle of Montana, South and North Dakota. Volume I. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    During the months of August through September 1978, geoMetrics, Inc. flew approximately 9000 line miles of high sensitivity airborne radiometric and magnetic data in eastern Wyoming and southern Montana over three 1/sup 0/ x 2/sup 0/ NTMS quadrangle (Newcastle, Gillette, and Ekalaka) as part of the Department of Energy's National Uranium Resource Evaluation program. All radiometric and magnetic data were fully reduced and interpreted by geoMetrics, and are presented as four volumes (one Volume I and three Volume II's) in this report. The survey area lies entirely within the northern Great Plains Physiographic Province. The deep Powder River Basin and the Black Hills Uplift are the two dominant structures in the area. Both structures strike NNW approximately parallel to each other with the Powder River Basin to the west of the Uplift. The Basin is one of the largest and deepest in the northern Great Plains and contains over 17,000 feet of Phanerozoic sediments at its deepest point. Economic deposits of oil, coal, bentonite and uranium are found in the Tertiary and/or Cretaceous rocks of the Basin. Gold, silver, lead, copper, manganese, rare-earth elements and uranium have been mined in the Uplift. Epigenetic uranium deposits lie primarily in the Monument Hills - Box Creek and Pumpkin Buttes - Turnercrest districts within arkosic sandstones of the Paleocene Fort Union Formation. A total of 368 groups of statistical values in the uranium window meet the criteria for valid anomalies and are discussed in the interpretation sections (83 in Newcastle, 109 in Gillette, and 126 in Ekalaka). Most anomalies lie in the Tertiary sediments of the Powder River Basin, but only a few are clearly related to known uranium mines or prospects. Magnetic data generally delineate the deep Powder River Basin relative to the Black Hills Uplift. Higher frequency anomalies appear related to producing oil fields and mapped sedimentary structures.

  14. Increased levels of harvest and habitat law enforcement and public awareness for anadromous salmonids and resident fish in the Columbia River Basin - Demonstration period, 1992-1994. Final report

    International Nuclear Information System (INIS)

    1995-06-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin

  15. Reducing problems of the public in an oil spill: s case study of the Nepco 140 incident, the St. Lawrence River, June, 1976. Final report Aug 77-Apr 78

    Energy Technology Data Exchange (ETDEWEB)

    Omohundro, J.T.

    1978-04-01

    The methodology sociologists have developed for natural disaster research is applied to a large pollution event. Questionnaires, interviews, and documentary fieldwork in the riparian communities on the U.S. side of the St. Lawrence River between Mason's Point, Jefferson County, New York, and Massena, St. Lawrence County, New York, provide the data. Conditions before the pollution event are reviewed for their influence on the emergency behavior of citizens. The public's immediate reaction to the spill, their alert and self-protective measures, their search for organization and information, their evaluation of the work of the pollution contractors and Coast Guard, and their evaluation of the effects of the spill are analysed through narrative and simple statistical procedures. The report concludes that the area residents' planning for and response to a massive river pollution even needs improvement and that the Coast Guard's handling of public problems in a pollution event can also be improved. Recommendations are made which could be applicable to Coast Guard public relations and spill planning on the St. Lawrence River as well as other water bodies. (Author)

  16. Antecedent Rivers

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 1; Issue 8. Antecedent Rivers - Ganga Is Older Than Himalaya. K S Valdiya. General Article Volume 1 Issue 8 August 1996 pp 55-63. Fulltext. Click here to view fulltext PDF. Permanent link: https://www.ias.ac.in/article/fulltext/reso/001/08/0055-0063 ...

  17. RIVER STATE

    African Journals Online (AJOL)

    principals randomly selected from one hundred secondary schools in Cross River State. The data collected ... There was no siyriificant influerlce of gender on principals' leadership styles effectiveness. ... result of the cultural stereotyping of males and females by .... schools were single sex boys, another 10 were single sex ...

  18. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Gurney, Kevin R. [Arizona Univ., Mesa, AZ (United States)

    2015-01-12

    This document constitutes the final report under DOE grant DE-FG-08ER64649. The organization of this document is as follows: first, I will review the original scope of the proposed research. Second, I will present the current draft of a paper nearing submission to Nature Climate Change on the initial results of this funded effort. Finally, I will present the last phase of the research under this grant which has supported a Ph.D. student. To that end, I will present the graduate student’s proposed research, a portion of which is completed and reflected in the paper nearing submission. This final work phase will be completed in the next 12 months. This final workphase will likely result in 1-2 additional publications and we consider the results (as exemplified by the current paper) high quality. The continuing results will acknowledge the funding provided by DOE grant DE-FG-08ER64649.

  19. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    DeTar, Carleton [P.I.

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  20. Birecik: a role model for private companies

    Energy Technology Data Exchange (ETDEWEB)

    Holzmann, P. [Corporate Communications, Frankfurt am Main (Germany)

    2001-04-01

    The Birecik hydroelectric power project in Turkey is highlighted as a good example of the effectiveness of a private sector company in planning, financing and constructing a hydro power plant on a build, operate and transfer (BOT) basis. Birecik AS has built the 672 MW plant and dam on the River Euphrates near the border with Syria as part of a Turkish government plan to develop southeast Anatolia. The dam, which was built on schedule and within budget, has embankments on the left and right hand sides and a gravity dam in the centre containing the power house, intake and spillway. The power house contains six Francis turbines, three of which are already operational. The plant's specifications and other vital statistics are summarised in a table. Its location is shown in a map of Turkey.

  1. Open innovation: the activities and views of companies in Wales

    DEFF Research Database (Denmark)

    Rhisiart, Martin; Djebarni, Rami; Thomas, Andrew

    favoured by companies are: 1) Financial support for collaboration, 2) Increase co-funding schemes for SMEs’ R&D, 3) Improve the institutional framework for collaboration, 4) Improve access to governmental support, 5) Foster networks and clusters The report sets out seven key recommendations for promoting......This is the Final Report of a study conducted on open innovation in companies in Wales. The programme of research included a review of global literature, interviews with 15 companies, a survey and a focus group.The study discusses Government support measures for open innovation.  Those most...

  2. 75 FR 70224 - New York Tidal Energy Company; Notice Concluding Pre-Filing Process and Approving Process Plan...

    Science.gov (United States)

    2010-11-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12665-003] New York Tidal... Tidal Energy Company. e. Name of Project: East River Tidal Energy Pilot Project. f. Location: In the...-6405. i. FERC Contact: Timothy Konnert (202) 502-6359. j. New York Tidal Energy Company (NYTEC) has...

  3. Sectorial analysis of nanotechnology companies in Argentina

    Science.gov (United States)

    Foladori, Guillermo; Lau, Edgar Záyago; Carroza, Tomás; Appelbaum, Richard P.; Villa, Liliana; Robles-Belmont, Eduardo

    2017-06-01

    In this paper, we identify 37 companies that produce nano-enabled products in Argentina. We locate the products of these firms in terms of both their economic sector and position in a value chain. The research was done through a four-step methodology. Firstly, an inventory of firms was created. Secondly, the firms were classified by their economic sector, following the United Nations economic classification. Thirdly, the firms were located within a simple nanotechnology value chain. Finally, the products were classified according to their final destination, being either means of production or final consumer products. The results show that healthcare, cosmetics, and medicine is the most represented sector along the value chain, followed by electronics.

  4. Service supply company experience

    International Nuclear Information System (INIS)

    Shouldice, S.P.

    1995-01-01

    The motivations for a small company to go international were reviewed, as well as the efforts required to identify markets compatible with what one has to offer. The variety of approaches taken to capitalize on the perceived opportunities were summarized. Motives for going international include minimization of risk by market diversification, revenue growth, and improved profitability where there is a run-up in demand. Getting started usually includes the following six steps: (1) selecting a target market, (2) interpreting market needs, (3) understanding local decision making, (4) deciding on a proposal, (5) seeking project financing, and (6) overcoming hurdles. Setting up shop also implies seeking market commitment, finding suitable long-term accommodation, finding suitable local workers, and exploring local sourcing for materials and equipment. Having a competitive advantage is essential to penetrating international markets. A cost advantage is the most valuable. Patience, persistence and perseverance were also identified as essential virtues

  5. Property company's sustainability goals.

    Science.gov (United States)

    Ormsby, Kim

    2014-11-01

    In a keynote presentation on the second morning of this year's Healthcare Estates conference, Kim Ormsby (pictured), national corporate social responsibility (CSR) and sustainability manager at NHS Property Services, discussed how, as part of its broader goals of 'supporting the NHS in delivering clinical services', and 'helping to enhance the experience' of patients visiting its buildings, the organization would continue to pursue and embed in its activities sustainable policies wherever and whenever possible, encouraging both its staff and tenants to take a similar approach. In an informative address, she highlighted some of the key steps the property company had already taken to encourage a proactive approach. Echoing the sentiments of Day One keynote speaker, Julian Hartley (see pages 55-60), she argued that one of the fundamentals to success was wide-ranging staff engagement.

  6. A forward looking company

    International Nuclear Information System (INIS)

    Christian, David A.

    2004-01-01

    The article is an excerpt of an interview with David A. Christian, Senior Vice President-Nuclear and Chief Nuclear Officer, Dominion Generation conducted at NEI's Nuclear Energy Assembly in New Orleans, Louisiana on 13 May 2004. It highlights the company's energy diversity, and in particular, activities related to early-site permits and possible future plans for nuclear power plant development in the U.S. The interview touches on questions related to the Consortium (composed of Dominion, AECL Technologies, the U.S. subsidiary of AECL, Hatachi America and Bechtel Power Corp.) and the DOE financial support involved (approximately 50%) along with comments related to job impacts, energy security and climate change impacts, human resource issues (particularly about getting high school students interested in jobs related to the nuclear industry) and public policy. The interview ends with a discussion of investment interest and the state of standardization in the industry

  7. Measuring the Company Performance

    Directory of Open Access Journals (Sweden)

    Ion Stancu

    2006-03-01

    Full Text Available According to the logics of the efficient capital investment, the management of the investment of the saving capital in the company’s assets must conclude, on the end of the financial year, with a plus ofreal value (NPV > 0. From this point of view, in this paper we suggest the usage of an investment valuationmodel for the assessment of the company managerial and technological performance. Supposing the book value is a proxy of the just value (of assets and operational results and supposing the capital cost iscorrectly estimated, we evaluate the company’s performance both by the net present value model, and also by the company’s ability to create a surplus of the invested capital (NPV >0.Our paper also aims to identify the performance of the financial breakeven point (for which NPV is at least equal to zero as the minimum acceptable level for the company’s activity. Under this critical sales point, the company goes through the undervaluation of shareholders fortune even if the company’s sales are greater than accounting breakeven point. The performance’s activity level is one which the managers recover and surpass the cost of capital, cost which stand for the normal activity benchmark.The risks of applying of our suggested model we support go down to the confidence of accounting data and of the cost of capital estimating. In spite all of this, the usage of a sensitivity analysis to search anaverage NPV would leads to the company’s performance valuation within investment logic with a high information power.

  8. Measuring the Company Performance

    Directory of Open Access Journals (Sweden)

    Ion Stancu

    2006-01-01

    Full Text Available According to the logics of the efficient capital investment, the management of the investment of the saving capital in the company’s assets must conclude, on the end of the financial year, with a plus of real value (NPV > 0. From this point of view, in this paper we suggest the usage of an investment valuation model for the assessment of the company managerial and technological performance. Supposing the book value is a proxy of the just value (of assets and operational results and supposing the capital cost is correctly estimated, we evaluate the company’s performance both by the net present value model, and also by the company’s ability to create a surplus of the invested capital (NPV >0. Our paper also aims to identify the performance of the financial breakeven point (for which NPV is at least equal to zero as the minimum acceptable level for the company’s activity. Under this critical sales point, the company goes through the undervaluation of shareholders fortune even if the company’s sales are greater than accounting breakeven point. The performance’s activity level is one which the managers recover and surpass the cost of capital, cost which stand for the normal activity benchmark. The risks of applying of our suggested model we support go down to the confidence of accounting data and of the cost of capital estimating. In spite all of this, the usage of a sensitivity analysis to search an average NPV would leads to the company’s performance valuation within investment logic with a high information power.

  9. Company Secretaries: Their duties and powers

    OpenAIRE

    2009-01-01

    Every company must have a company secretary. Their main role is to: carry out the directors’ instructions; help ensure that the company obeys the law and its own constitutional rules; and prepare and maintain the associated company documents.

  10. Modeling renewable energy company risk

    International Nuclear Information System (INIS)

    Sadorsky, Perry

    2012-01-01

    The renewable energy sector is one of the fastest growing components of the energy industry and along with this increased demand for renewable energy there has been an increase in investing and financing activities. The tradeoff between risk and return in the renewable energy sector is, however, precarious. Renewable energy companies are often among the riskiest types of companies to invest in and for this reason it is necessary to have a good understanding of the risk factors. This paper uses a variable beta model to investigate the determinants of renewable energy company risk. The empirical results show that company sales growth has a negative impact on company risk while oil price increases have a positive impact on company risk. When oil price returns are positive and moderate, increases in sales growth can offset the impact of oil price returns and this leads to lower systematic risk.

  11. THE MANAGEMENT OF THE ENERGY COMPANIES

    Directory of Open Access Journals (Sweden)

    Ionescu (Sas Mihaela

    2014-07-01

    Full Text Available This paper aims to contribute to a better knowledge of the problems of energy services provided that both the international economic literature and in the Romanian, it continues to be addressed in a low position. Therefore, the author examines energy services through mechanisms that can be saved primary energy and final energy in the context of declining energy reserves worldwide. Economic and financial crisis and the current recession contribute to preventing the development of the energy services market and solutions on the framework conditions of political, economic, legal and financial aspects of energy performance contracts associated with these companies. Some Member States have already established a system requiring the national energy industry to achieve energy savings, achieving positive results: there were savings of up to 6% of final energy consumption. In a system of this type, utilities are required to obtain a fixed amount of energy savings by implementing energy efficiency improvements in their clients (such as households, companies, government or housing associations and other sectors and energy production and transport. As an alternative to savings by themselves, some systems allow utilities to purchase energy savings from other actors such as energy service companies (ESCOs. Energy saving obligations stimulate providers to change their business model from retail energy products to the provision of energy services. Energy Service Companies continues to be a key area for financing energy efficiency in the EU. In this respect, several Member States mention providing model contracts for energy services, the introduction of legislation or removing legal barriers for ESCO access to energy services in the public sector. Meanwhile, many of the measures encouraged on ESCO contain too little detail on specific actions to be taken.

  12. Motives for Corporate Social Responsibility in Chinese Food Companies

    Directory of Open Access Journals (Sweden)

    Dongyong Zhang

    2018-01-01

    Full Text Available This paper explores the connection between corporate social responsibility (CSR and food safety and how best to promote CSR in Chinese food companies by comparing two groups of food companies, one which had food safety incidents in the previous three years and one which had no food safety incidents during the same period. Managers of 498 food companies in 17 regions of China were surveyed. It was found that companies where the senior management gave higher levels of support and commitment to CSR and companies that had higher levels of CSR engagement had lower food safety incident rates. Motives for CSR engagement by food companies are the expected benefits that might accrue to the company including helping to achieve strategic objectives, improving daily management, ensuring food safety, improving internal cooperation, enhancing food quality, improving employees’ skills at work, increasing employee benefit and improving their morale, and maintaining business integrity. It was also found that the external factors for CSR engagement are consumer demand, as well as pressures from the government and from other companies in the supply chain. Finally, the paper makes a number of suggestions for improvements in policy.

  13. Narrative Finality

    Directory of Open Access Journals (Sweden)

    Armine Kotin Mortimer

    1981-01-01

    Full Text Available The cloturai device of narration as salvation represents the lack of finality in three novels. In De Beauvoir's Tous les hommes sont mortels an immortal character turns his story to account, but the novel makes a mockery of the historical sense by which men define themselves. In the closing pages of Butor's La Modification , the hero plans to write a book to save himself. Through the thrice-considered portrayal of the Paris-Rome relationship, the ending shows the reader how to bring about closure, but this collective critique written by readers will always be a future book. Simon's La Bataille de Pharsale , the most radical attempt to destroy finality, is an infinite text. No new text can be written. This extreme of perversion guarantees bliss (jouissance . If the ending of De Beauvoir's novel transfers the burden of non-final world onto a new victim, Butor's non-finality lies in the deferral to a future writing, while Simon's writer is stuck in a writing loop, in which writing has become its own end and hence can have no end. The deconstructive and tragic form of contemporary novels proclaims the loss of belief in a finality inherent in the written text, to the profit of writing itself.

  14. Flood Control Minnesota River, Minnesota, Minnesota, Mankato-North Mankato-Le Hillier, Design Memorandum Number 8. Part I. Location Study and Draft Supplement II to the Final Environmental Impact Statement for Bridge Relocations. Chicago and Northwestern Transportation Company Bridges Over the Blue Earth River between Mankato and Le Hillier.

    Science.gov (United States)

    1981-04-01

    230.4-1Cc) (2)) The composition of the biological community was sampled in the study area. The insect association is generally representative of a warm...be considered in discharge determination (40 CFR 230.5(a)) (1) Impacts on chemical, physical, and biological integrity of acuatic ecosystem (40 CFR

  15. Coomunication Culture in a company

    Directory of Open Access Journals (Sweden)

    M V Korotitskaya

    2008-03-01

    Full Text Available The article substantiates the interconnections between the level of communicative culture in a company and the level of management, which shows the investment and financial attractiveness of the enterprise. The article reveals principles and methods of sociocommunicative technology, whose application positively affects the state of communicative culture of within a company. Application examples of these principles and methods in management of power grid companies in the Belgorod region are also given.

  16. Benchmarking in Mobarakeh Steel Company

    OpenAIRE

    Sasan Ghasemi; Mohammad Nazemi; Mehran Nejati

    2008-01-01

    Benchmarking is considered as one of the most effective ways of improving performance in companies. Although benchmarking in business organizations is a relatively new concept and practice, it has rapidly gained acceptance worldwide. This paper introduces the benchmarking project conducted in Esfahan's Mobarakeh Steel Company, as the first systematic benchmarking project conducted in Iran. It aims to share the process deployed for the benchmarking project in this company and illustrate how th...

  17. Quality management in shipping companies

    Directory of Open Access Journals (Sweden)

    Đergović Dragana M.

    2017-01-01

    Full Text Available As international business becomes more competitive, companies are finding that they need to work more effectively to stay in business. Quality assurance has become very important to the majority of production and service companies with international activity. Shipping companies were also required to implement a quality management system. The huge importance of safety in maritime transport operations resulted in the International Safety Management Code (ISM Code by the International Maritime Organization. The general management system principles embodied by the maritime ISM Code and generics ISO standards, have enabled their complementary application in establishing a quality management system in shipping companies, within a safety management system as its subset.

  18. Principles of European Company Law

    DEFF Research Database (Denmark)

    Werlauff, Erik

    2010-01-01

    The article focuses on how much we have in common in Europe within company law and its development, and on the principles which are the determining factors for the activities of European companies. The article shows that what we have in common greatly outweighs what divides us, and this is presen......The article focuses on how much we have in common in Europe within company law and its development, and on the principles which are the determining factors for the activities of European companies. The article shows that what we have in common greatly outweighs what divides us...

  19. Company profile VUJE

    International Nuclear Information System (INIS)

    Anon

    2007-01-01

    At the present time the whole world realizes the serious need for energy for the preservation of perpetually sustainable development. A distinctive place in the life of modern society belongs to electric energy,its safe production and reliable delivery according high standards of quality. When our company was established 30 years ago, we assumed research and development challenges directly related to the safe, reliable and economical production of electric energy from nuclear power plants, as well as the elimination of potential negative influences on the environment and employees. During our existence, we have gradually expanded our activities and specializations. Our first job was ti train plant personnel. We trained specialists to meet the needs not only of (what was then) Czechoslovakia, but also of Germany and Hungary. Gradually, we also met the problems of processing and storing radioactive waste, maintaining the service-life of our equipment and deactivating and disposing of contaminated devices at the end their operating lives. Industry requirements and concerns led us to broaden our services in energy production to include renewable sources of energy. Our youngest division of activity deals with the distribution of hydro-electrical energy via the electric grid. By continually updating the specialized skills of our elmasil and by investing in the latest equipment, our challenges and operational issues in the energy sector. Responding to developmental trends and the requirements of our consumers, we have established a system of quality management, which complies with the ISO 9001 and 14001 standards certified by the LRQA Corporation of Great Britain. Throughout the years, our company has been consistently proving to the operators of power facilities, both in Slovakia and abroad, our viability and high, innovative potential, in recognition of this, in 2005, when we participated in the sixth EU Framework Programme in R and D, the Slovak Ministry of Education

  20. Company profile VUJE

    International Nuclear Information System (INIS)

    Anon

    2007-01-01

    At the present time the whole world realizes the serious need for energy for the preservation of perpetually sustainable development. A distinctive place in the life of modern society belongs to electric energy,its safe production and reliable delivery according high standards of quality. When our company was established 30 years ago, we assumed research and development challenges directly related to the safe, reliable and economical production of electric energy from nuclear power plants, as well as the elimination of potential negative influences on the environment and employees. During our existence, we have gradually expanded our activities and specializations. Our first job was ti train plant personnel. We trained specialists to meet the needs not only of (what was then) Czechoslovakia, but also of Germany and Hungary. Gradually, we also met the problems of processing and storing radioactive waste, maintaining the service-life of our equipment and deactivating and disposing of contaminated devices at the end their operating lives. Industry requirements and concerns led use to broaden our services in energy production to include renewable sources of energy. Our youngest division of activity deals with the distribution of hydro-electrical energy via the electric grid. By continually updating the specialized skills of our employees and by investing in the latest equipment, our challenges and operational issues in the energy sector. Responding to developmental trends and the requirements of our consumers, we have established a system of quality management, which complies with the ISO 9001 and 14001 standards certified by the LRQA Corporation of Great Britain. Throughout the years, our company has been consistently proving to the operators of power facilities, both in Slovakia and abroad, our viability and high, innovative potential, in recognition of this, in 2005, when we participated in the sixth EU Framework Programme in R and D, the Slovak Ministry of

  1. Antecedent Rivers

    Indian Academy of Sciences (India)

    far north of the high NandaDevi (7,817 m) - Api Nampa. (7,132 m) range of the Himadri. The Sindhu flows northwestwards, the Satluj goes west, the Karnali takes the southerly course and the Tsangpo flows east. These rivers flow through their pristine channels, carved out at the very outset about 50 to 55 m.y (million years) ...

  2. Contested Rivers

    DEFF Research Database (Denmark)

    Gorm Hansen, Louise Lyngfeldt

    In recent years, hydropower and the sustainability of large hydropower projects has become a contested field. While for example hydropower companies maintain that hydropower is a renewable and sustainable source of electricity, a number of NGOs sharply question this assumption. The paper explores...... policy making, decision drivers and framing of large hydropower projects in China. Hydropower is a complex and interesting field to explore as the consequences go beyond the immediate locality and interacts with local as well as the global contexts. Inspired by Tsing (2003) and Zhan (2008) the paper...... and natural scientists and Chinese hydropower companies (to name a few). The paper maps different actors’ framing of the issue to gain a deeper understanding of the complexities of hydropower policymaking in China, as well as map the local consequences of global policymaking about large hydropower...

  3. Final Report

    DEFF Research Database (Denmark)

    Heiselberg, Per; Brohus, Henrik; Nielsen, Peter V.

    This final report for the Hybrid Ventilation Centre at Aalborg University describes the activities and research achievement in the project period from August 2001 to August 2006. The report summarises the work performed and the results achieved with reference to articles and reports published...

  4. Company Value Anatomy

    Directory of Open Access Journals (Sweden)

    Luiz Nelson Guedes de Carvalho

    2008-10-01

    Full Text Available The seminal propositions by Modigliani and Miller started a new study area in modern finance theory. Over time, their basic assumptions were relaxed, to the extent that, nowadays, situations in which they can be fully applied, with consistent and satisfactory results, are rare. On the other hand, as this simple set of propositions became known worldwide and was easily applicable, it was adopted as a rule of thumb for general enterprise valuation. However, in situations without methodological bias, the resulting enterprise values obtained by traditional methodologies are abstruse and do not allow for the analysis and management of the individual values that make up the firm and own capital values. In order to avoid this kind of abstruseness in company valuation, this study theoretically deducts an alternative valuation methodology, which permits the identification of assets’ value independently of their financing; moreover, we identify the gain on debt value that the debt provides to the shareholders, the debt tax shield and the value loss of assets and tax shield due to the increase in shareholder risk because of the leverage capital structure.

  5. Leven estuary project. Fisheries Department final report

    OpenAIRE

    Bayliss, B.D.

    1997-01-01

    This is the report on the Leven estuary project: Fisheries Department final report produced by the Environment Agency North West in 1997. This report contains information about Leven estuary, river Leven catchment, river Crake catchment and the Ulverston Discharges. The Leven estuary is characterised by being very shallow, and shares the extremely variable tides and currents that characterize the whole of Morecambe Bay. There was little detailed knowledge of the impact on the Leven estuary, a...

  6. Tourist Satisfaction with Hospitality Services on River Ship “Ms River Aria”

    Directory of Open Access Journals (Sweden)

    Nikola Vuksanović

    2013-07-01

    Full Text Available The main prerequisite for a successful business of hospitality services and building customer loyalty is to develop measures for improving and development hospitality services and offer. This paper presents the results of tourists satisfaction surveys based on the measurement of expected and perceived levels of quality hospitality services on a river ship “MS River Aria” company “Grand Circle Cruise Line”. The survey was conducted between March and September 2012 on the itinerary: Amsterdam - Vienna (SGE, Amsterdam - Antwerp (SHH, Linz - Budapest (EDR and Budapest - Constanta (LBS. A model for measuring hospitality services was developed by the company itself. During statistical data analysis, only the highest ratings, whose share was shown as percentage, were taken into account. The obtained results may be relevant for other cruise companies and contribute to the improvement of business and pleasure tourist.

  7. The art of company financial modelling

    Directory of Open Access Journals (Sweden)

    Zoran Lukić

    2017-01-01

    Full Text Available In corporate finance, the term financial modelling denotes a widely used technique of comprehensive customised quantification of a company’s entire operations. Even though not mathematically strict, such models exhibit descriptive, explanatory and predictive qualities. The paper elaborates on the main steps and principles for building financial models of companies. It also identifies required assumptions and certain statistical properties of well-constructed models. Furthermore, it describes the use of such models for decision support purposes, supplemented by an illustrative example. Finally, it discusses general characteristics and concerns associated with appropriate model construction and use.

  8. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    Energy Technology Data Exchange (ETDEWEB)

    Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River

  9. A research company in transition

    International Nuclear Information System (INIS)

    Hatcher, S.R.

    1989-01-01

    The role of Atomic Energy of Canada Ltd's Research Company is to perform the research, development, demonstration and marketing needed to apply nuclear sciences and their associated technologies for the maximum benefit of Canada. This article by its president, Dr S R Hatcher, describes the Research Company as it attempts to fulfil its mission in very altered circumstances. (Author)

  10. Oil companies and human rights

    International Nuclear Information System (INIS)

    Chandler, Geoffrey

    1997-01-01

    This article highlights the need for oil companies in the future to take into account human rights in corporate decision making. The influence oil companies can bring to bear on government violating human rights, excuses for not voicing condemnation of abuses, and the 1948 Universal Declaration of Human Rights are discussed. (UK)

  11. A strategy for company improvement.

    Science.gov (United States)

    Howley, L

    2000-03-01

    Strategies based on the kaizen methodology are designed to continuously improve company performance without the need for large capital investments. This article looks at how one company used simple kaizen principles to its advantage, achieving 67% increase in productivity and 10% reduction in the standard cost of product.

  12. Company Development Through the Employees

    DEFF Research Database (Denmark)

    Møller, Niels; Hvenegaard, Hans; Limborg, Hans Jørgen

    2003-01-01

    Human Deveoplment and Working Life - Work for Welfare explores whether the development of human resources at company level can improve individuals' quality of life, companies' possibilities of development, and welfare and democracy in society. Chapter four documents the the proces and results...

  13. Organisational architectres of multinationale companies

    OpenAIRE

    Křivanová, Jana

    2009-01-01

    At work I try to define a few concepts - globalization, multinational companies and organizational architecture. Should also bring the development and analyze the structures of multinational companies, and show their use in practice. Zoom in further development of organizational structures with regard to the global crisis.

  14. Responsibilities of Companies towards Employees

    Directory of Open Access Journals (Sweden)

    Monray Marsellus Botha

    2015-07-01

    Full Text Available Central to company law is the promotion of corporate governance. An important question in company law still today is in whose interest the company should be managed. Corporate governance needs to address the entire span of responsibilities to stakeholders of the company such as customers, employees, shareholders, suppliers and the community at large. The promotion of human rights in the application of company law must also take place. This is extremely important given the significant role of enterprises within the social and economic life of the nation. The interests of various stakeholder groups in the context of the corporation as a "social institution" should be enhanced and protected. Because corporations are part of society and the community, like all of us, it is required of them to be socially responsible and have greater accountability to all stakeholders of the company. Although directors must act in the best interests of shareholders collectively they must also consider the interests of other stakeholders. Sustainable relationships with all the relevant stakeholders are thus important. The advancement of social justice is thus important to corporations in that they should take note of the Constitution, labour legislation and company law legislation when social justice issues are dealt with. Employees have become very important stakeholders of companies and their needs should be taken into account in the bigger corporate governance and social responsibility framework.

  15. Company's Data Security - Case Study

    Science.gov (United States)

    Stera, Piotr

    This paper describes a computer network and data security problems in an existing company. Two main issues were pointed out: data loss protection and uncontrolled data copying. Security system was designed and implemented. The system consists of many dedicated programs. This system protect from data loss and detected unauthorized file copying from company's server by a dishonest employee.

  16. Gamification in a Consulting Company

    NARCIS (Netherlands)

    Blaauw, Frank; Bazylevska, L.; Aiello, M.

    2014-01-01

    Gamification refers to the use of game-design elements in a non-gaming context. The consulting company Capgemini has set up a rudimentary Gamification platform to help motivating the people to do extra work for the company in their spare time. In order to re- ward people for this effort, they can

  17. Renewal of the small hydro power plant 'La Foulaz' on the river Orbe in Vallorbe, Switzerland; Rehabilitation de la petite centrale hydroelectrique de la Foulaz sur l'Orbe a Vallorbe. Etude d'avant projet - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Chenal, R.; Denis, V. [La Foulaz Energies SA, Vallorbe (Switzerland); Chuat, O. [RWB Eau et Environnement SA, Cernier (Switzerland)

    2009-08-15

    For now nearly four centuries, hydro power is used on the site named 'La Foulaz' on the river Orbe in the Vallorbe municipal territory. The existing small-scale hydro power plant is under neglect since 1970, although it enjoys a permanent water usage concession of 4.2 m{sup 3}/s. Since June 2008 the company 'La Foulaz Energie SA' owns the site and the water concession and is planning the renewal of the hydro power plant. The plan is to replace the existing permanent water flow rate usage concession by a higher water flow rate usage one of reasonable but limited duration. Reliable hydrological data are available from the Swiss Federal Administration as well as from the electricity utility 'Romande Energie SA' that operates the 'La Dernier' hydro power plant located up-stream. According to these data the design flow rate of 10 m{sup 3}/s has been selected for the new 'La Foulaz' plant. The available water head for the turbine is in the range 1.46 to 3-00 m, depending on the flow rate in the river Orbe. The average annual power production is estimated to 708,000 kWh. The peak electrical power would be 164 kW. With a cost recovery time of 25 years the production cost is estimated to 25 Swiss cents/kWh. This just enables to balance the budget. (author)

  18. Main Causes Of Mortality Of Companies In Central Region Of Ecuador

    Directory of Open Access Journals (Sweden)

    Jorge Vladimir Núñez Grijalva

    2015-12-01

    Full Text Available Most of the studies concerning trading companies, addressing aspects of the initial stage in the life of these, such as its formation stage. However, few studies have examined the final stage of a company and especially the causes of mortality and closing. This article analyzes the main causes of mortality trading companies from three different and complementary disciplines at once: legal, administrative and financial accounting in commercial companies of the Central Region of Ecuador. This research provides a summary of the major causes of mortality, which should be considered by the current and future employers, in order to strengthen their decisions regarding the survival of companies.

  19. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  20. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  1. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Stinis, Panos [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-07

    This is the final report for the work conducted at the University of Minnesota (during the period 12/01/12-09/18/14) by PI Panos Stinis as part of the "Collaboratory on Mathematics for Mesoscopic Modeling of Materials" (CM4). CM4 is a multi-institution DOE-funded project whose aim is to conduct basic and applied research in the emerging field of mesoscopic modeling of materials.

  2. Financial Performance Bank BNI Syariah Company

    Directory of Open Access Journals (Sweden)

    Diana Widhi Rachmawati

    2018-05-01

    Full Text Available ABSTRACT PT Bank BNI Syariah, one of them working are a big banking company is almost covering all over the country until now looked at  pretty good company asset which are owned, so author conduct research in the title “Financial Performance PT Bank BNI Syariah in Solvability Ratio”. Financial Statement Analysis is aplication from tools and technical analysis financial report general aim and data to be related and estimation produce useful conclutions in business analysis. Financial Performance Analysis research used analysis methode is solvability ratio. General aim to give information finance performance PT Bank BNI Syariah development.  Special goals is finance performance PT Bank BNI Syariah from Solvability Ratio”. This Sample is: PT Bank BNI Syariah. Final result which is research obtained it says finance performance  PT Bank BNI Syariah from Solvability Ratio quite solvable, because this three point inside it contained increased.  This development hope PT Bank BNI Syariah, to be remain consistent with trying to do breakthrough a company goals   Key Words  :  Financial Performance PT Bank BNI Syariah

  3. River Corridor Easements

    Data.gov (United States)

    Vermont Center for Geographic Information — A River Corridor Easement (RCE) is an area of conserved land adjacent to a river or stream that was conserved to permanently protect the lateral area the river needs...

  4. Biological and Physical Inventory of the Streams within the Nez Perce Reservation; Juvenile Steelhead Survey and Factors that Affect Abundance in Selected Streams in the Lower Clearwater River Basin, Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kucera, Paul A.; Johnson, David B. (Nez Perce Tribe, Lapwai, ID)

    1986-08-01

    A biological and physical inventory of selected tributaries in the lower Clearwater River basin was conducted to collect information for the development of alternatives and recommendations for the enhancement of the anadromous fish resources in streams on the Nez Perce Reservation. Five streams within the Reservation were selected for study: Bedrock and Cottonwood Creeks were investigated over a two year period (1983 to 1984) and Big Canyon, Jacks and Mission Creeks were studied for one year (1983). Biological information was collected and analyzed on the density, biomass, production and outmigration of juvenile summer steelhead trout. Physical habitat information was collected on available instream cover, stream discharge, stream velocity, water temperature, bottom substrate, embeddedness and stream width and depth. The report focuses on the relationships between physical stream habitat and juvenile steelhead trout abundance.

  5. Aerial gamma ray and magnetic survey: Powder River R and D Project. Portions of the: Forsyth and Hardin, Montana, and the Sheridan, Arminto, Newcastle, and Gillette, Wyoming Quadrangles. Final report

    International Nuclear Information System (INIS)

    1979-05-01

    During the months of August through September, 1978, geoMetrics, Inc. flew approximately 1520 line miles of high sensitivity airborne radiometric and magnetic data in Wyoming and southern Montana within four 1 0 x 2 0 NTMS quadrangles (Arminto, Sheridan, Hardin and Forsyth), and 1390 lines miles in the detail area in eastern Wyoming, as part of the Department of Energy's National Uranium Resource Evaluation program. All radiometric and magnetic data were fully reduced and interpreted by geoMetrics, and are presented as three volumes (one Volume I and two Volume II's) in this report. The survey area lies largely within the northern Great Plains Physiographic Province. The deep Powder River Basin is the dominant structure in the area. Portions of the Casper Arch, Big Horn Uplift, and Porcupine Dome fall within the western limits of the area. The Basin is one of the largest and deepest in the northern Great Plains and contains over 17,000 feet of Phanerozoic sediments at its deepest point. Economic deposits of oil, coal, bentonite and uranium are found in the Tertiary and/or Cretaceous rocks of the Basin. Epigenetic uranium deposits lie primarily in the Pumpkin Buttes - Turnercrest districts within arkosic sandstones of the Paleocene Fort Union Formation. A total of 62 groups of statistical values for the R and D area and 127 for the Arminto Detail in the uranium window meet the criteria for valid anomalies and are discussed in their respective interpretation sections. Most anomalies lie in the Tertiary sediments of the Powder River Basin. Some of the anomalies in the Arminto Detail are clearly related to mines or prospects

  6. Final disposal of nuclear waste. An investigated issue

    International Nuclear Information System (INIS)

    Palmu, J.; Nikula, A.

    1996-01-01

    Since 1978, the nuclear power companies have co-ordinated joint studies of nuclear waste disposal through the Nuclear Waste Commission of Finnish Power Companies. The studies are done primarily to gather basic data, with a view to implementing nuclear waste management in a safe, economical and timely way. The power companies' research, development and design work with regard to nuclear waste has been progressing according to the schedule set by the Government, and Finland has received international recognition for its advanced nuclear waste management programme. Last year, the nuclear power companies set up a joint company, Posiva Oy, to manage the final disposal of spent uranium fuel. (orig.)

  7. Capability maturity models in engineering companies: case study analysis

    Directory of Open Access Journals (Sweden)

    Titov Sergei

    2016-01-01

    Full Text Available In the conditions of the current economic downturn engineering companies in Russia and worldwide are searching for new approaches and frameworks to improve their strategic position, increase the efficiency of the internal business processes and enhance the quality of the final products. Capability maturity models are well-known tools used by many foreign engineering companies to assess the productivity of the processes, to elaborate the program of business process improvement and to prioritize the efforts to optimize the whole company performance. The impact of capability maturity model implementation on cost and time are documented and analyzed in the existing research. However, the potential of maturity models as tools of quality management is less known. The article attempts to analyze the impact of CMM implementation on the quality issues. The research is based on a case study methodology and investigates the real life situation in a Russian engineering company.

  8. River Diversions and Shoaling

    National Research Council Canada - National Science Library

    Letter, Jr., Joseph V; Pinkard, Jr., C. F; Raphelt, Nolan K

    2008-01-01

    This Coastal and Hydraulics Engineering Technical Note describes the current knowledge of the potential impacts of river diversions on channel morphology, especially induced sedimentation in the river channel...

  9. Third European Company Survey: Workplace innovation in European companies

    OpenAIRE

    Oeij, P.; Žiauberyté-Jakštiené, R.; Dhondt, S.; Corral, A.; Totterdill, P.; Preenen, P.

    2015-01-01

    Workplace innovation (WPI) is a developed and implemented practice or combination of practices which enables employees to participate in organisational change and renewal and hence improve the quality of working life and organisational performance. This report looks at reasons for enabling WPI, adoption and implementation, and impact on organisation and management, employees and employee representatives. The research is based on 51 companies identified in Eurofound’s third European Company Su...

  10. Fuel buyers guide: company data

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Four major listings relating to nuclear fuel services are provided. 1. A fuel buyer's guide listing companies under alphabetical order of country and giving addresses and an indication of the services offered. 2. A fuel buyers guide classifying companies in alphabetical order of the services offered. 3. A fuel and front end facility listing subdivided into companies involved in: uranium ore processing; uranium refining and conversion; enrichment; fuel fabrication; heavy water production; zirconium metal production; and zirconium tube production. 4. A fuel and front end facilities listing giving operators' addresses under alphabetical order of country. (UK)

  11. Monitoring of the water quality of the Surata River in the mining area of Vetas and California

    International Nuclear Information System (INIS)

    Gomez, Vladimir Illich

    2004-01-01

    The regional autonomous corporation for the defense of the Bucaramanga plateau, environmental authority in the area of influence of the Mining District of Vetas and California, exercises among other activities, the pursuit and control to the auriferous exploitations. Two of the components of this pursuit are: the monitoring of the water quality of the Surata River, final receiver of the effusions coming from of the mineral benefit and the discharges control of cyanidation sand or cyanidation lines, by means of the monthly programming of daily discharges for mining company; in order to diminish the events of high cyanide concentrations in the hydraulic averages and to reduce the cyanide consumptions for the recovery of gold. The mining exploitations of the municipality pour their residuals to the Vetas River, while those of the Municipality of California, pour them to the gulch La Baja, flowing of the Vetas River who in turn is flowing of the Surata River, that supplies a part of the system of aqueduct of the Bucaramanga Municipality. The water quality of mining effusions is determined in three monitored points on the gulch La Baja, the Vetas River and the Surata River; additionally it is made a sampling and analysis of silts in four points on the same currents. The sampling frequency for the water quality is monthly, while for the silts analysis is biweekly. This monitoring is carried out from the year 1988, although it has suffered some interruptions in the time. The technique of water sampling is punctual, integrated to the wide of the bed and without seating capacity, the taking of silts is punctual and integrated to the wide of the bed and without seating capacity, these samples are preserved and transported to the laboratory of waters and soils of the CDMB, where the following parameters are analyzed: for the water sample, mercury, free cyanide and total cyanide, suspended solids, turbidity, pH and conductivity; for the sample of silts only mercury is analyzed

  12. Comparison of Resources and Capabilities in two Companies

    OpenAIRE

    Malo Milara, Iván

    2014-01-01

    Treball Final de Grau en Administració d'Empreses. Codi: AE1049. Curs acadèmic 2013-2014 Our aim in this end-of-grade work, is to know how resources and capabilities are used to get a competitive advantage. For this purpose, we will analyze two important companies in the furniture sector: Albani and Ikea.

  13. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  14. East India Company Logbooks - Images

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This collection consists of images of 1,235 ship logbooks created during British East India Company voyages. Period of record 1786-1834, peaking in 1804. The...

  15. Business intelligence for insurance companies

    OpenAIRE

    IGNATIUK A.

    2016-01-01

    The current state and future trends for the world and domestic insurance markets are analyzed. The description of business intelligence methodology, tools and their practical implication for insurance companies are provided.

  16. BUSINESS INTELLIGENCE FOR INSURANCE COMPANIES

    Directory of Open Access Journals (Sweden)

    A. Ignatiuk

    2016-06-01

    Full Text Available The current state and future trends for the world and domestic insurance markets are analyzed. The description of business intelligence methodology, tools and their practical implication for insurance companies are provided.

  17. International Companies in Fragile States

    DEFF Research Database (Denmark)

    Patey, Luke; Kragelund, Peter

    Denmark must not fail to promote corporate social responsibility in fragile states. International companies remain active in these environments, and often worsen rather than alleviate poor governance. Financial transparency and human rights initiatives offer the first step in ensuring...

  18. Introduction to Oryx Energy Company

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Oryx Energy is an international hydrocarbon exploration and production company with proved reserves approaching one billion equivalent barrels and assets of about $4 billion. The company's worldwide headquarters are in Dallas, Texas, and it has major interests in the US Gulf of Mexico where it is expanding into the Flex Trend area. By the end of the decade, however, the company expects that 50 percent of its total reserves will be in the fast-growing overseas arena. Its current interests include operations in the United Kingdom North Sea, Indonesia, Equador, Gabon and Australia. To exploit and increase these resources the company has investigated in horizontal drilling techniques and advanced computing facilities which have greatly improved its direct hydrocarbon indicator technology, three-dimensional seismic analysis and reservoir simulations. (UK)

  19. LEADERSHIP DEVELOPMENTS IN SLOVENIAN COMPANIES

    Directory of Open Access Journals (Sweden)

    Andrej Kohont

    2016-04-01

    Full Text Available In this paper we study the relationship between the company and the leaders. We are interested what is characteristic of leadership in the best Slovenian companies. We used standardised employee questionnaire and data gathered in the Golden thread project. We observe the situation in these companies in the period between 2007 and 2014 to find out if there are any significant changes in leadership developments. Special attention in leadership observation is devoted to 1. The fundamental relationship between the company and the leaders, 2. The role and quality of leaders work, 3. Organizational culture, climate and relationships, 4. Entrepreneurship and innovation, 5. The quality of the working environment, 6. The personal growth and development and 7. Emotional commitment. The analysis represents an insight into current leadership situation and shows that the recent developments were heavily marked by the economic crisis, especially in 2009.

  20. Beyond "medical tourism": Canadian companies marketing medical travel.

    Science.gov (United States)

    Turner, Leigh

    2012-06-15

    -border health services available in the United States and intranational travel to clinics in Canada. In contrast to medical tourism companies, they do not market holiday tours in addition to medical care. Two companies occupy a narrow market niche and promote testing for CCSVI and "Liberation therapy" for multiple sclerosis. Three additional companies offer bariatric surgery and cosmetic surgery at facilities in Mexico. Four businesses offer health insurance products intended to cover the cost of obtaining privately financed health care in the U.S. These businesses also help their clients arrange treatment beyond Canada's borders. Finally, one medical travel company based in Canada markets health services primarily to U.S. citizens. This article uses content analysis of websites of Canadian companies marketing medical travel to provide insight into Canada's medical travel industry. The article reveals a complex marketplace with different types of companies taking distinct approaches to marketing medical travel.

  1. Beyond "medical tourism": Canadian companies marketing medical travel

    Science.gov (United States)

    2012-01-01

    businesses market regional, cross-border health services available in the United States and intranational travel to clinics in Canada. In contrast to medical tourism companies, they do not market holiday tours in addition to medical care. Two companies occupy a narrow market niche and promote testing for CCSVI and “Liberation therapy” for multiple sclerosis. Three additional companies offer bariatric surgery and cosmetic surgery at facilities in Mexico. Four businesses offer health insurance products intended to cover the cost of obtaining privately financed health care in the U.S. These businesses also help their clients arrange treatment beyond Canada’s borders. Finally, one medical travel company based in Canada markets health services primarily to U.S. citizens. Conclusions This article uses content analysis of websites of Canadian companies marketing medical travel to provide insight into Canada’s medical travel industry. The article reveals a complex marketplace with different types of companies taking distinct approaches to marketing medical travel. PMID:22703873

  2. Company Stock in Pension Funds

    OpenAIRE

    Even, William E.; Macpherson, David

    2004-01-01

    This study examines several issues surrounding the tendency for some pension funds to invest in their own company’s stock. After reviewing the existing literature describing the benefits and costs of investing in company stock, the legislative environment surrounding company stock holdings is reviewed. Using data from Internal Revenue Service Form 5500 filings on the pension fund holdings of over 300,000 defined–contribution pension plans in the 1990s, we show that about one out of ten define...

  3. Benchmarking in Mobarakeh Steel Company

    Directory of Open Access Journals (Sweden)

    Sasan Ghasemi

    2008-05-01

    Full Text Available Benchmarking is considered as one of the most effective ways of improving performance incompanies. Although benchmarking in business organizations is a relatively new concept and practice, ithas rapidly gained acceptance worldwide. This paper introduces the benchmarking project conducted in Esfahan’s Mobarakeh Steel Company, as the first systematic benchmarking project conducted in Iran. It aimsto share the process deployed for the benchmarking project in this company and illustrate how the projectsystematic implementation led to succes.

  4. Organizational culture in ICT companies

    OpenAIRE

    Pilík, Tomáš

    2013-01-01

    This thesis deals with problematic of organizational culture with emphasis on organizational culture in ICT companies. Main goal of this thesis is to develop own framework for influencing organizational culture in ICT companies. The introductory part sums up an overview of definitions of culture and organizational culture in chronological order. Evaluation of definitions from the author's perspective is also part of the opening chapter. The main part of thesis focuses on proposing framework f...

  5. financial analysis of the company

    OpenAIRE

    Pojerová, Jana

    2008-01-01

    The main goal of this bachelor thesis called "Company Financial Analysis" is to evaluate the financial situation of ZS Kosova Hora a.s. in the years 2005 2013 using standard methods of financial analysis. To achieve this goal horizontal and vertical analyses, ratio analysis, pyramidal decomposition of the ROE indicator and solvency and bankruptcy models have been used. In all these areas the selected company has been compared with a selected sample of other agricultural enterprises and its fi...

  6. DISTRIBUTION MANAGEMENT IN COMPANY X

    OpenAIRE

    Agnieszka Wójcik-Mazur; Karina Wieczorek

    2012-01-01

    The subject of this publication is the problem of distribution management, exemplified by Company X. The process has been defined by analysing the conditions necessary to satisfy prospects’ needs and create the market position of a business entity. The paper focuses on the basic features of distribution system and the character of distribution channels.The assessment of distribution management has been illustrated with an example of Company X. The subjects of interest are: the dynamics of ord...

  7. Communication Practices in Technology Companies.

    OpenAIRE

    Casey, Ruth; Gallagher, Marc

    2016-01-01

    It is contended that the skills or competencies that are required of business graduates by technology companies, range from the ability to communicate complex information about global issues in ways that are accessible to and connect with the general public, to problem-solving and project-based interaction. This represents a shift in the type of communication practice that now characterises the technology company, with its main focus on “agile” frameworks of teamwork. This report examines the...

  8. Which Companies Benefit form Liberalization?

    DEFF Research Database (Denmark)

    Baghdasaryan, Delia; la Cour, Lisbeth; Schneider, Cédric

    2016-01-01

    Theoretical research shows that competition has positive effects on productivity, for companies that are initially efficient, but not for unproductive firms. Our empirical analysis on a panel data of Czech companies, years 1995–2004, confirms this result. In addition, our analysis shows that when...... economic reforms affect both domestic and foreign competition, controlling for domestic competition is crucial when assessing the impact of trade liberalization. Otherwise, the effect of trade liberalization on firm productivity is upward biased....

  9. Multispectral processing of ERTS-A (LANDSAT) data for uranium exploration in the Wind River Basin, Wyoming: a visible region ratio to enhance surface alteration associated with roll-type uraium deposits. Final report, June 1974--July 1975

    International Nuclear Information System (INIS)

    Salmon, B.C.; Pillars, W.W.

    1975-07-01

    The purpose of this report is to document possible detection capabilities of the LANDSAT multispectral scanner data for use in exploration for uranium roll-type deposits. Spectral reflectivity, mineralogy, iron content, and color paramenters were measured for twenty natural surface samples collected from a semiarid region. The relationships of these properties to LANDSAT response-weighted reflectances and to reflectance ratios are discussed. It was found that the single ratio technique of multispectral processing is likely to be sensitive enough to separate hematitic stain, but not limonitic. A combination of the LANDSAT R/sub 5,4/ and R/sub 7,6/ ratios, and a processing technique sensitive to vegetative cover is recommended for detecting areas of limonitic stain. Digital level slicing of LANDSAT R/sub 5,4/ over the Wind River Basin, after geometric correction, resulted in adequate enhancement of Triassic redbeds and lighter red materials, but not for limonitic areas. No recommendations for prospects in the area were made. Information pertaining to techniques of evaluating laboratory reflectance spectra for remote sensing applications, ratio processing, and planimetric correction of LANDSAT data is presented qualitatively

  10. Aerial gamma ray and magnetic survey: Minnesota Project, Thief River Falls, Grand Forks, Fargo, Milbank, Watertown, New Ulm and St. Cloud quadrangles of North Dakota, South Dakota and Minnesota. Final report

    International Nuclear Information System (INIS)

    1979-10-01

    During the months of August and September 1979, geoMetrics, Inc., collected 12,415 line miles of high sensitivity airborne radiometric and magnetic data in adjoining portions of South Dakota and Minnesota over seven 1 by 2 degree NTMS quadrangles (Thief River Falls, Grand Forks, Fargo, Milbank, Watertown, New Ulm, and St. Cloud) as part of the Department of Energy's National Uranium Resource Evaluation Program. All radiometric and magnetic data were fully corrected and interpreted by geoMetrics and are presented as eight volumes (one Volume I and seven Volume II's). Regional geology for these seven quadrangles can be divided into two logical sections. The first comprises the surficial glacial deposits, which mantle most of the area and can be up to hundreds of feet thick. The second section consists of the underlying bedrock which is exposed in small scattered outcrops, generally along major drainages. No sedimentary structures exist within the quadrangles. As of this writing, no known uranium deposits exist within the seven quadrangles

  11. Proceedings from a Workshop on Ecological Carrying Capacity of Salmonids in the Columbia River Basin : Measure 7.1A of the Northwest Power Planning Council`s 1994 Fish and Wildlife Program : Report 3 of 4, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Neitzel, D.A.; Mavros, William V.

    1996-05-01

    This report contains the proceedings of a workshop held during 1995 in Portland, Oregon. The objective of the workshop was to assemble a group of experts that could help us define carrying capacity for Columbia River Basin salmonids. The workshop was one activity designed to answer the questions asked in Measure 7.1A of the Council`s Fish and Wildlife Program. Based, in part, on the information we learned during the workshop we concluded that the approach inherent in 7.1A will not increase understanding of ecology, carrying capacity, or limiting factors that influence salmon under current conditions. Measure 7.1A requires a definition of carrying capacity and a list of determinants (limiting factors) of capacity. The implication or inference then follows that by asking what we know and do not know about the determinants will lead to research that increases our understanding of what is limiting salmon survival. It is then assumed that research results will point to management actions that can remove or repair the limiting factors. Most ecologists and fisheries scientists that have studied carrying capacity clearly conclude that this approach is an oversimplification of complex ecological processes. To pursue the capacity parameter, that is, a single number or set of numbers that quantify how many salmon the basin or any part of the basin can support, is meaningless by itself and will not provide useful information.

  12. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Jarillo-Herrero, Pablo [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-02-07

    This is the final report of our research program on electronic transport experiments on Topological Insulator (TI) devices, funded by the DOE Office of Basic Energy Sciences. TI-based electronic devices are attractive as platforms for spintronic applications, and for detection of emergent properties such as Majorana excitations , electron-hole condensates , and the topological magneto-electric effect . Most theoretical proposals envision geometries consisting of a planar TI device integrated with materials of distinctly different physical phases (such as ferromagnets and superconductors). Experimental realization of physics tied to the surface states is a challenge due to the ubiquitous presence of bulk carriers in most TI compounds as well as degradation during device fabrication.

  13. Trade Companies and their Classification

    Directory of Open Access Journals (Sweden)

    P. Tărchilă

    2013-12-01

    Full Text Available The Romanian legislation does not define anyhow the concept of companies. It was the merit of the doctrine, which attempted such a definition, starting usually from the provisions of the Civil Code, which in art. 1491 defines the civil society, for the purpose of the memorandum of the association1. For that matter, also in the specialized foreign doctrine (ex. the French doctrine companies are defined based on similar concepts, but standardized by the Civil Code. The two meanings that the company has to be regarded through, also explain the very specific legal matter, a matter of concepts resulting from understanding the concept of memorandum of association and the company-institution. Thus, the contractual conception, imposed by the development of the contract theory in the last century, explains the existence of the companies starting from the validity conditions imposed to any contract and from the contractual techniques that establish the relationships formed within the society (for example, the company management is based on a mandate contract under which the executive operates.

  14. 76 FR 62802 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-10-11

    ... Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National...,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch Potomac River in..., Washington, DC 20426. Please affix ``Jennings Randolph Hydroelectric Project No. 12715-003'' to all comments...

  15. 75 FR 57746 - Lockhart Power Company; Notice of Application Tendered for Filing With the Commission, Soliciting...

    Science.gov (United States)

    2010-09-22

    .... Applicant Contact: Bryan D. Stone, Chief Operating Officer, Lockhart Power Company, Inc., 420 River Street... Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy...

  16. The political role of national oil companies in the large exporting countries : the Venezuela case

    International Nuclear Information System (INIS)

    Mommer, B.

    1994-01-01

    This paper starts by defining the role of mining companies vis-a vis the landlords in a modern economy. Then it examines the role international oil companies played in exporting countries. Finally the role of national oil companies is analyzed following the same scheme : what is their contribution to the development of a new landlord-tenant relationship, nationally and internationally ? ''Petroleos de Venezuela'' is taken as an example. (Author). 27 refs

  17. Archaeology audit program final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-04-15

    In order to review oil and gas companies' archaeological management systems, the British Columbia Oil and Gas Commission (OGC) introduced its archaeology audit program (AAP) in April 2008. As part of this audit, twenty six oil and gas companies were selected for an office documentation review and a corresponding field audit. This document presented and described these audit results. The purpose of the final audit report was to provide information to assist oil and gas companies to improve their management systems by increasing the emphasis of the preservation of cultural resources. This report presented an overview of the AAP scope and methodology and provided examples from the audit of both good management practices encountered and practices in which opportunities for improvement to archaeological management systems could be implemented. Recommendations to address improvement opportunities were also discussed. It was concluded that the oil and gas companies subject to the audit were found to have met or exceeded OGC expectations for maintaining archaeological management systems. 2 tabs., 7 figs.

  18. Bipartite Networks of Universities and Companies: Recruiting New Graduates in Japan

    Science.gov (United States)

    Takahashi, Katsuhide; Kobayashi, Yuh; Kondo, Yohei; Takayasu, Hideki; Takayasu, Misako

    We investigated the bipartite Universities-Companies Network in Japan in terms of companies' recruitment of new graduates. In Japan, graduates of universities are typically hired by companies upon their graduation. To examine socially accepted ideas about this recruiting system, we combined different types of data on education, recruitment and corporate finance. The hypothesis that graduates from prestigious universities have the advantage of entering excellent companies was verified by examining the determinants of ratio of graduates entering top-ranked companies. Through hierarchical clustering, we obtained classification trees and observed the stability of their structure, as well as interesting changes corresponding to the business climate. We also calculated weighted HITS hub and authority values for each university and company and identified the links between the results of this analysis and those above. Finally, analysis of all the data indicated that excellent companies recruiting many graduates from prestigious universities do not necessarily show superb performance in profit-making and growth.

  19. Analysis Of Employee Engagement And Company Performance

    OpenAIRE

    Mekel, Peggy A.; Saerang, David P.E.; Silalahi, Immanuel Maradopan

    2014-01-01

    Employee could be a competitive advantage of a company if company manages its employees well. The success of a company could be seen from how a company manages their employees and engages their employees. Most of big companies put their employees in top priority in order to keep their top performance. These big companies manage their employees and try to engage their employees so that their employees could generate high performance. In this study, employee engagement is the factor to examine ...

  20. Human resource policy and Danish multinational companies

    DEFF Research Database (Denmark)

    Fleming, Daniel; Søborg, Henrik

    A study of Danish multinational companies' human resource policy in their subsidiaries in Malaysia and Singapore.The sample of companies consists of 8 Danish multinational companies with activities in both Malaysia and Singapore.......A study of Danish multinational companies' human resource policy in their subsidiaries in Malaysia and Singapore.The sample of companies consists of 8 Danish multinational companies with activities in both Malaysia and Singapore....

  1. 77 FR 14689 - Drawbridge Operation Regulation; Berwick Bay (Atchafalaya River), Morgan City, LA

    Science.gov (United States)

    2012-03-13

    ... Operation Regulation; Berwick Bay (Atchafalaya River), Morgan City, LA AGENCY: Coast Guard, DHS. ACTION... Fe (BNSF) Railway Company vertical lift span bridge across Berwick Bay, mile 0.4, (Atchafalaya River, mile 17.5) at Morgan City, St. Mary Parish, Louisiana. The deviation is necessary to perform scheduled...

  2. 17 CFR 270.6b-1 - Exemption of employees' securities company pending determination of application.

    Science.gov (United States)

    2010-04-01

    ...' securities company pending determination of application. 270.6b-1 Section 270.6b-1 Commodity and Securities... 1940 § 270.6b-1 Exemption of employees' securities company pending determination of application. Any... Act (54 Stat. 801; 15 U.S.C. 80a-6) shall be exempt, pending final determination of such application...

  3. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Webb, Robert C. [Texas A& M University; Kamon, Teruki [Texas A& M University; Toback, David [Texas A& M University; Safonov, Alexei [Texas A& M University; Dutta, Bhaskar [Texas A& M University; Dimitri, Nanopoulos [Texas A& M University; Pope, Christopher [Texas A& M University; White, James [Texas A& M University

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  4. Value of Construction Company and its Dependence on Significant Variables

    Science.gov (United States)

    Vítková, E.; Hromádka, V.; Ondrušková, E.

    2017-10-01

    The paper deals with the value of the construction company assessment respecting usable approaches and determinable variables. The reasons of the value of the construction company assessment are different, but the most important reasons are the sale or the purchase of the company, the liquidation of the company, the fusion of the company with another subject or the others. According the reason of the value assessment it is possible to determine theoretically different approaches for valuation, mainly it concerns about the yield method of valuation and the proprietary method of valuation. Both approaches are dependant of detailed input variables, which quality will influence the final assessment of the company´s value. The main objective of the paper is to suggest, according to the analysis, possible ways of input variables, mainly in the form of expected cash-flows or the profit, determination. The paper is focused mainly on methods of time series analysis, regression analysis and mathematical simulation utilization. As the output, the results of the analysis on the case study will be demonstrated.

  5. Theoretical and Practical Aspects Regarding the Nulity of Commercial Companies

    Directory of Open Access Journals (Sweden)

    Cornelia Lefter

    2009-11-01

    Full Text Available The absence of a Romanian legal definition of the concept of nullity of commercial companies arouses a lot of questions. The delimitation of this concept is very important for a correct establishment of its field of application. In other words, are the cases of nullity of commercial companies regulated only by Law no. 31/1990 or by the provisions of common law as well?Started from the fact that the nullity is not considered by the legislator a simple sanction applicable to the juridical acts but it affects directly the existence of the company and becomes a means to sanction the creation of a legal person by disregarding the imperative legal provisions, we analyzed firstly the Romanian (II and the EU legal provisions regarding the nullity of commercial companies. The elements of this analyze helped us to qualify the nullity of commercial companies and its effect (III. Finally, through the conclusion formulated we hope to call the attention on the fact that a company, even created through the non-observance of the legal rules, can be viable from economic point of view and it is senseless to make it disappearance.

  6. luxury marketing: internationalization strategies for brazilian jewelry companies

    Directory of Open Access Journals (Sweden)

    Chaline Gasperini

    2010-04-01

    Full Text Available This article seeks to make an analysis of the luxury market and of Brazilian jewelry companies. The main objective is to analyze the attraction of external marketing to luxury brands internationalization, emphasizing Brazilian jewelry companies. First, the national environment of luxury market an jewelry in Brazil is presented. In sequence, it will address the possible goals, risks and opportunities that internationalized jewelry companies face in the expansion process and its difficulties in foreign markets. Finally, some forms of internationalization will be presented based on the case of the Brazilian jewelry companies H Stern and Talento Jóias. The methodology used in this article is exploratory, with documental analysis and in depth interview. As theoretical foundations for the article, the themes luxury, exportations, company internationalization and global market were addressed. The main author(s researched were: Allérès (2006, Almeida (2007, Czinkota (2001, Grande (2007, Lipovetsky e Roux (2005. Among the main conclusions, Brazilian jewelry companies have great advantages compared to other countries, having the possibility to use Brazilian nature resources, like precious stones and gems, thus, it become more interesting and viable to innovate and conquer external market. Besides, jewelry market attractions make several entrepreneurs interested in opening business in this field, and lately internationalize them, such as H Stern case.

  7. Analysis of the Internationalization Process of a Venezuelan Company

    Directory of Open Access Journals (Sweden)

    Rosângela Sarmento da Silva

    2013-04-01

    Full Text Available This paper aimed to analyze, under the perspectives of economic and organizational behavior theories, the case of the internationalization of Agrogilca, a Venezuelan company classified as an small and medium business, which operates in the mining segment, agricultural materials and building materials. This is an instrumental case study, which had as sources of evidence the examination of documents provided directly by company’s directors and interviews with its owner and employees. For the data analysis and interpretation, it was took the procedure of adaptation to the theory, since the data obtained empirically were contrasted to elements of already consolidated theories about internationalization of companies. It is concluded that the strategy adopted by Agrogilca company is very close to Theory of Market Power proposed by Hymer, in which companies tend to intensify its position abroad and expand their operations. Its internationalization process did not occur according to the Uppsala model, in which the gradualism of relationship matches the gradualism of internationalization processes, but only with exportations that make companies intensify its position abroad, and finally, shows proximity to the internationalization strategy of Multidomestic Theory of Hoskisson. This is because this theory considers as an internationalization cause the sectoral conditions, political structures and customer needs for a greater administrative performance and competitiveness of the company.

  8. Ankara National Textiles [Turkish] Incorporated Company (1916-1930

    Directory of Open Access Journals (Sweden)

    M. Bülent Varlık

    2014-06-01

    Full Text Available This study aims to provide brief information on the foundation, activities and closing down of Ankara National Textiles Incorporated Company, which was founded by a group of local tradesmen in Ankara within the scope of the “National Economy Policy” implemented by the Union and Progress Association. The aforementioned local tradesmen undertook the first steps to establish a factory in mid-1913, and as a result of these efforts, the aforementioned incorporated Company was founded in 1916. This Company, probably due to a low quality production, was closed down, possibly around the years 1921-1922. In 1925, a reconstruction process was initiated with the intervention of the politics and bureaucracy of Ankara, and the capital of the Company was increased. However, these attempts failed and finally, the Company was closed down in 1928. The factory was acquired by Türkiye İş Bankası in 1930, and after the endeavors, it continued its activities as a new company under the name Yün-İş.

  9. Dispatch Method for Independently Owned Hydropower Plants in the Same River Flow

    Directory of Open Access Journals (Sweden)

    Slavko Krajcar

    2012-09-01

    Full Text Available This paper proposes a coexistence model for two independent companies both operating hydropower plants in the same river flow, based on a case study of the Cetina river basin in Croatia. Companies are participants of the day-ahead electricity market. The incumbent company owns the existing hydropower plants and holds concessions for the water. The new company decides to build a pump storage hydropower plant that uses one of the existing reservoirs as its lower reservoir. Meeting reservoir water balance is affected by decisions by both companies which are independently seeking maximal profit. Methods for water use settlement and preventing of spillage are proposed. A mixed-integer linear programming approach is used. Head effects on output power levels are also considered. Existences of dispatches that satisfy both companies are shown.

  10. The European Company : From a Swedish private company perspective

    OpenAIRE

    Öster, Alexandra; Alm, Cecilia

    2006-01-01

    The development within the European Union is that we are heading towards a common internal market. The law has during the year become more harmo-nized within the Union in many areas. The company law within the European Union has become harmonized through several company law directives and the freedom of establishment, which is included in the EC Treaty. The aim of an internal market is about to be achieved, but there are still differences between the systems of law within the Member States. T...

  11. Synthetic Minor NSR Permit: Red Cedar Gathering Company - Arkansas Loop and Simpson Treating Plants

    Science.gov (United States)

    This page contains the response to public comments and the final synthetic minor NSR permit for the Red Cedar Gathering Company, Arkansas Loop and Simpson Treating Plants, located on the Southern Ute Indian Reservation in La Plata County, CO.

  12. 26 CFR 1.831-1 - Tax on insurance companies (other than life or mutual), mutual marine insurance companies, and...

    Science.gov (United States)

    2010-04-01

    ... mutual), mutual marine insurance companies, and mutual fire insurance companies issuing perpetual... companies (other than life or mutual), mutual marine insurance companies, and mutual fire insurance... insurance companies and mutual fire insurance companies exclusively issuing either perpetual policies, or...

  13. Logistics in Estonian business companies

    Directory of Open Access Journals (Sweden)

    A. Kiisler

    2008-12-01

    Full Text Available The article describes logistics survey in Estonia carried out in 2007 as a part of the LogOnBaltic project. The level of logistics in Estonian manufacturing, trading and logistics companies is explored through logistics costs, performance indicators, outsourcing, ICT use and logistics self-estimation of the companies responded. Responses from 186 Estonian companies were gathered through a web-based survey (38% of manufacturing, 38% of trading and 24% of logistics sector. Logistics costs as the percentage of turnover make in average 13.8% in manufacturing and 13.3% in trading. Transportation and inventory carrying cost form around 70% of overall logistics costs. Considering the logistics indicators surveyed, Estonian companies show up with relatively low perfect order fulfillment rates, short customer order fulfillment cycles and effective management of cash flows. The most widely outsourced logistics function is international transportation followed by domestic transportation, freight forwarding and reverse logistics. By 2010, the outsourcing of IT systems in logistics followed by inventory management, warehousing and product customization is expected to increase more substantially. The awareness of logistics importance is still low among Estonian companies. Only 27–44% of those agree that logistics has a considerable impact on profitability, competitive advantage, top management or customer service level.

  14. International Odra project (IOP) 'Interdisciplinary German Polish studies on the behaviour of pollutants in the Oder system'. Sub project 4: the state of suspended particulate matter in the Odra River system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Henning, K.H.; Damke, H.; Kasbohm, J.; Puff, T.; Breitenbach, E.; Theel, O.; Kiessling, A.

    2001-05-20

    The purpose of the present project was to characterise the pollutant freight of suspended matter and suspended-matter-borne sediments in the Oder river system on the basis of large samples drawn at selected sampling sites. One of the major goals was to assess and draw up a balance of the transport regime of suspended matter between the compartments water, suspended matter and sediments. Special attention was given to the composition and structure of suspended matter as well as to the distribution of trace elements in the various components. Furthermore, the study was intended to provide ecology-related information on the basis of selected biogenic components. Statements on the time course of pollution of estuarine waters and the Baltic Sea by way of the Oder can be derived from a characterisation of current fluviatile solids (suspended matter and suspended-matter-borne sediments) and determination of their quantitative proportions. The following research strategy was derived from these goals: for a characterisation of suspended matter in terms of composition, structure and biogenic origin it is necessary to determine the concentration of suspended matter, its granulometric composition, carbon and sulphur content, biogenic opal content, mineral content, phase composition, metal content, structure of suspended flakes and association of diatoms in the suspended flakes and on the periphyton. [German] Das Vorhaben ist darauf ausgerichtet, den Belastungszustand der Schwebstoffe und schwebstoffbuertigen Sedimente im Oderflusssystem anhand von Grossproben ausgewaehlter Probenahmeorte zu charakterisieren. Ein wesentliches Ziel ist die Beurteilung des Transportregimes der Schwebstoffe zwischen den Kompartimenten Wasser, Schwebstoff und Sediment sowie seine Bilanzierung. Dabei gilt die besondere Aufmerksamkeit der Zusammensetzung und der Struktur der Schwebstoffe sowie die Spurenelementspeziation an die unterschiedlichen Bestandteile. Weiterhin werden oekologische Aussagen

  15. Online Company-stakeholder Communication

    DEFF Research Database (Denmark)

    Eriksen, Rikke Augustinus; Morsing, Mette

    Based on a systematic data collection we study one of the first pioneering company-stakeholder communication campaigns in social media: the case of energy company Vattenfall A/S’s pan-European campaign ‘The Climate Manifesto’. Our findings challenge the general assumption, that stakeholder...... lacked between the company and stakeholders. Vattenfall was accused of green-washing, resulting in a communications crisis. Negative stakeholder reactions consisted of prejudiced and non-negotiable argumentation indicating that social media imposes new managerial challenges since communication processes...... technologies and we question to what extent social media serve the enhancement of improved understandings across corporate and civil society on CSR issues. This paper suggests that managers face a risk of the “double-edge of stakeholder communication” when incorporating social media into their CSR strategies...

  16. The oil companies in 1998

    International Nuclear Information System (INIS)

    Cueille, J.Ph.

    1999-01-01

    The drop in the price of crude oil has had a strong impact on oil companies earnings in 1998: for the first three-quarters, profits were down by an average 30 %. The performance levels attained by the refining-distribution activities, generally on a upwards trend, were not able to compensate for the sharp decrease in upstream earnings. Given these unfavorable circumstances, a number of companies are cutting back on capital investment projects. Unable to make further internal cost reductions on the same scale as before, oil companies are seeking to realize productivity gains through regional partnerships or large-scale mergers that, to some extent, could modify the traditional oil industry ranking

  17. Towards Biological Restoration of Tehran Megalopolis River Valleys- Case Study: Farahzad River

    Science.gov (United States)

    Samadi, Nafishe; Oveis Torabi, Seyed; Akhani, Hossein

    2017-04-01

    Towards biological restoration of Tehran megalopolis river-valleys: case study Farahzad river 1Nafiseh Samadi, 2OveisTorabi, 3Hossein Akhani 1Mahsab Shargh Company, Tehran ,Iran, nafiseh19@gmail.com 2 Mahsab Shargh Company, Tehran ,Iran, weg@tna-co.com 3Department of Plant Sciences, Halophytes and C4 Research Laboratory, School of Biology, College of Sciences, University of Tehran, PO Box 14155-6455, Tehran, Iran, akhani@khayam.ut.ac.ir Tehran is located in northcentral parts of Iran on the alluvium of southern Alborz Mountains. Seven rivers originated from the highlands of N Tehran run inside and around the city. Many of these river valleys have been deformed by a variety of urban utilizations such as garden, building, canal, park, autobahn etc. Tehran with more than eight million populations suffered from adverse environmental conditions such as pollution and scarcity of natural habitats for recreational activities. Ecological restoration of altered river valleys of Tehran is one of the priorities of Tehran municipality started as a pilot project in Farahzad river. Intensive disturbance, conversion into various urban utilization, illegal building construction, waste water release into the river, garbage accumulation, artificial park constructions and domination of invasive species have largely altered the river. Parts of the river located in Pardisan Nature Park was studied before its complete deformation into a modern park. The riparian vegetation consisted of Tamarix ramosissima and Salix acmophylla shrubs with large number of aquatic and palustric plants. The norther parts of the river still contain semi-natural vegetation which change into patchy and intensive degraded habitats towards its southern parts. In northern parts of valley there are old gardens of Morus alba and Juglans regia, and planted trees such as Plataneus oreientalis and Acer negundo. Salix acmophylla, Fraxinus excelsior and Celtis caucasica are native species growing on river margin or

  18. Founders of share companies under the Ethiopian share company law

    African Journals Online (AJOL)

    This article explores the Commercial Code and other laws of Ethiopia regarding founders – who they are, liabilities and benefits - who are also called 'promoters' by many other company laws. To some extent, it also looks into the business practice based on documents like memorandum of associations, articles of ...

  19. Pro Forma Registration of Companies

    DEFF Research Database (Denmark)

    Werlauff, Erik

    2010-01-01

    The article analyses the view taken by Community law on companies' pro forma registration in another EU or EEA country. Community law recognises pro forma registration under company law, i.e. a brass plate is sufficient, whereas it does not recognise pro forma registration under tax law, i.......e. a brass plate is not sufficient. The article provides reasons for the differential treatment of the two contexts and clarifies the difference on the basis of the Hubbard criterion, in which it was ruled that the effectiveness of Community law cannot vary according to the various branches of national law....

  20. Evaluating Internal Technological Capabilities in Energy Companies

    Directory of Open Access Journals (Sweden)

    Mingook Lee

    2016-03-01

    Full Text Available As global competition increases, technological capability must be evaluated objectively as one of the most important factors for predominance in technological competition and to ensure sustainable business excellence. Most existing capability evaluation models utilize either quantitative methods, such as patent analysis, or qualitative methods, such as expert panels. Accordingly, they may be in danger of reflecting only fragmentary aspects of technological capabilities, and produce inconsistent results when different models are used. To solve these problems, this paper proposes a comprehensive framework for evaluating technological capabilities in energy companies by considering the complex properties of technological knowledge. For this purpose, we first explored various factors affecting technological capabilities and divided the factors into three categories: individual, organizational, and technology competitiveness. Second, we identified appropriate evaluation items for each category to measure the technological capability. Finally, by using a hybrid approach of qualitative and quantitative methods, we developed an evaluation method for each item and suggested a method to combine the results. The proposed framework was then verified with an energy generation and supply company to investigate its practicality. As one of the earliest attempts to evaluate multi-faceted technological capabilities, the suggested model can support technology and strategic planning.

  1. Applying Blockchain Technology: Evidence from Norwegian Companies

    Directory of Open Access Journals (Sweden)

    Anne H. Gausdal

    2018-06-01

    Full Text Available The aim of this study is to develop a theoretical framework for blockchain, operations in particular. Furthermore, we aim to identify the main drivers and barriers of digital innovation and explore the general possibilities of blockchain applications within the maritime industry. A case study approach is applied: the Norwegian offshore industry. Primary data is collected through interviews, while secondary data is collected from industrial and company reports, the Internet, and national and international media reports. We have discovered that cost reduction intentions, the high level of regulation in the maritime industry, and the large amount of data that maritime companies should process, along with the intention to work more effectively, are the main drivers of digital innovation. On the other hand, the high cost of implementation, the bad quality of Internet connections offshore, the old age of decision-makers, the technology-oriented culture, the lack of investment initiatives, the low level of blockchain diffusion through the supply chain, and risk aversion are the main barriers. The results of the qualitative study show that some of the barriers and motives of digital innovation and the introduction to blockchain technology were pointed out by earlier studies. However, we have identified several unique drivers and barriers specific to the industry. Finally, the blockchain process framework is developed.

  2. How to Analyze Company Using Social Network?

    Science.gov (United States)

    Palus, Sebastian; Bródka, Piotr; Kazienko, Przemysław

    Every single company or institution wants to utilize its resources in the most efficient way. In order to do so they have to be have good structure. The new way to analyze company structure by utilizing existing within company natural social network and example of its usage on Enron company are presented in this paper.

  3. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  4. 31 CFR 223.20 - Final decisions.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Final decisions. 223.20 Section 223.20 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE SURETY COMPANIES DOING BUSINESS WITH THE UNITED...

  5. Four state companies are markedly different

    International Nuclear Information System (INIS)

    Aalund, L.R.

    1995-01-01

    The Journal continues its profiles of state owned oil companies with a return to the Persian Gulf, South America, and a first time look at the state oil company of Romania, one of Eastern Europe's most active and oldest producers. The government of Kazakhstan's activities are also covered in this report. These profiles detail the organization of the companies, with emphasis on upstream and downstream operations. Support functions, though essential to a company, are not covered in detail. Company projects and capabilities are only described in this report when necessary to put the company in perspective. Following are the profiles of state companies for Bahrain, Kuwait, Romania, and Venezuela

  6. Reynolds Metals Company, Massena, NY

    Science.gov (United States)

    The 1,600-acre former Reynolds Metals Facility is located on the St. Lawrence River, approximately eight miles east of the Village of Massena, New York. The facility, which was constructed in 1958 for the production of aluminum, closed in 2014. It is owned

  7. Startup activities of established Finnish companies

    OpenAIRE

    Saalasti, Sini

    2016-01-01

    Established companies have collaborated with startups for decades in order to enhance their capabilities in technology and innovation. However, in the recent years, the changes in the business environment have induced established companies to increase their collaboration with startups. Thus, startup activities of established companies have become a timely phenomenon. This study explores the startup activities of established companies by analyzing all the activity established companies conduct...

  8. Flood Disaster Mitigation as Revealed by Cawang-Manggarai River Improvement of Ciliwung River

    Directory of Open Access Journals (Sweden)

    Airlangga Mardjono

    2015-06-01

    The final result of this simulation shows that Scenario 3 gives the lowest water surface elevation profile. Scenario 3 is subjected to river normalization, revetment works along the river, and also flood control structure improvement through the additional sluice gate on Manggarai Barrage. This scenario results 167 cm, 163 cm, 172 cm, 179 cm, 167 cm and 171 cm or 17,60%, 17,16%, 18,09%, 18,76%, 17,38% and 17,72% of maximum water level reduction respectively over cross section number S 20 to S 25, for several simulations with 100 year of design discharge. Keywords: Simulation, river improvement, flood water surface elevation.

  9. Ergonomics Contributions to Company Strategies

    NARCIS (Netherlands)

    J. Dul (Jan); W.P. Neumann (Patrick)

    2008-01-01

    textabstractManagers usually associate ergonomics with occupational health and safety and related legislation, not with business performance. In many companies, these decision makers seem not to be positively motivated to apply ergonomics for reasons of improving health and safety. In order to

  10. Resensi Buku: The Living Company

    Directory of Open Access Journals (Sweden)

    Ayu Chairina Laksmi

    2009-08-01

    Full Text Available Book ReviewJudul buku    : The Living CompanyPenulis    : Arie de GeusPengantar    : Peter M. SengePenerbit    : Harvard Business School PressTahun terbit    : 1997Tebal    : xiv + 214 hal

  11. Chinese Companies in the Netherlands

    NARCIS (Netherlands)

    Hong, T.M.; Pieke, F.N.; Stam, T.

    2017-01-01

    The rapid growth of Chinese investment in the Netherlands has been cause for both excitement and anxiety. Many of the companies and other investors are still unknown and the background and objectives of their investment often remain unclear. This research takes a close look at fourteen Chinese

  12. The Electric Company Writers' Notebook.

    Science.gov (United States)

    Children's Television Workshop, New York, NY.

    This handbook outlines the curriculum objectives for the children's television program, "The Electric Company." The first portion of the text delineates strategies for teaching symbol/sound analysis, including units on blends, letter groups, and word structure. A second section addresses strategies for reading for meaning, including…

  13. Financial management for small companies

    Science.gov (United States)

    Bruce Hansen; Jeff Palmer; Jeff Palmer

    2000-01-01

    The wood-products industry is characterized by many small manufacturers that lack the staff to compile and analyze information on their operations and investments. Two computer programs, FRAN and JEFFI, have been developed by the USDA Forest Service at Princeton, West Virginia,to help small companies better analyze and monitor current performance, and better evaluate...

  14. KNOWLEDGE MANAGEMENT IN A COMPANY

    Directory of Open Access Journals (Sweden)

    Petrică Stoica

    2013-12-01

    Full Text Available All organisations are primarily interested in maintaining and increasing intellectual capital assets, and knowledge management represents only a manner of supporting the satisfaction of this interest and of laying stress on this type of assets. A mistaken conception, according to which at the level of a company there is a finite knowledge store that can be “managed”, reflects nothing but the fact that, at the beginning, many companies have overlooked the general aim of their business. The intangible part is immaterial, difficult to describe, quantify and measure. The intangible asset has and creates value and that is why the evaluation of intellectual property does not represent a simple activity. From a modern viewpoint, organisational learning does not consist only in obtaining new knowledge, but also considers its employment in carrying out the activities of the company, and so it contributes to the generation of new knowledge. The success of companies depends on the personnel’s ability to understand, manipulate and develop information. In case of epistemic economy, the improvement of the innovation capacity, the creation of value and wealth are based on the division of knowledge.

  15. Orchestrating Company Development in SMEs

    DEFF Research Database (Denmark)

    Riis, Jens Ove

    2003-01-01

    Over a period of several years many companies undergo a transformation with signifi­cant improvement in performance. We have studied such a process in seven SMEs to achieve a better understanding of how the change process was initiated and orches­trated. A rather complex picture has emerged...

  16. Savannah River Site (SRS) environmental overview

    International Nuclear Information System (INIS)

    O'Rear, M.G.; Steele, J.L.; Kitchen, B.G.

    1990-01-01

    The environmental surveillance activities at and in the vicinity of the Savannah River Site (SRS) [formerly the Savannah River Plant (SRP)] comprise one of the most comprehensive and extensive environmental monitoring programs in the United States. This overview contains monitoring data from routine and nonroutine radiological and nonradiological environmental surveillance activities, summaries of environmental protection programs in progress, a summary of National Environmental Policy Act (NEPA) activities, and a listing of environmental permits (Appendix A) issued by regulatory agencies. This overview provides information about the impact of SRS operations on the public and the environment. The SRS occupies a large area of approximately 300 square miles along the Savannah River, principally in Aiken and Barnwell counties of South Carolina. SRS's primary function is the production of tritium, plutonium, and other special nuclear materials for national defense, for other governmental uses, and for some civilian purposes. From August 1950 to March 31, 1989, SRS was operated for the Department of Energy (DOE) by E. I. du Pont de Nemours ampersand Co. On April 1, 1989 the Westinghouse Savannah River Company assumed responsibility as the prime contractor for the Savannah River Site

  17. 75 FR 227 - Drawbridge Operation Regulations; Harlem River, New York, NY

    Science.gov (United States)

    2010-01-05

    ..., and require all the moveable bridges across the Harlem River, except the Spuyten Duyvil Bridge, to... eleven moveable bridges across the Harlem River provide the following vertical clearances in the closed... bridges across the Harlem River at New York City, New York. This final rule revises the drawbridge...

  18. 76 FR 30018 - Safety Zone; Marysville Days Fireworks, St. Clair River, Marysville, MI

    Science.gov (United States)

    2011-05-24

    ...-AA00 Safety Zone; Marysville Days Fireworks, St. Clair River, Marysville, MI AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary safety zone on St. Clair River, Marysville, MI. This zone is intended to restrict vessels from a portion of St. Clair River...

  19. 78 FR 46258 - Safety Zone; Upper Mississippi River, Mile 662.8 to 663.9

    Science.gov (United States)

    2013-07-31

    ...-AA00 Safety Zone; Upper Mississippi River, Mile 662.8 to 663.9 AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary safety zone for all waters of the Upper Mississippi River, from mile 662.8 to 663.9, extending the entire width of the river. This safety...

  20. 75 FR 55973 - Safety Zone; Illinois River, Mile 000.5 to 001.5

    Science.gov (United States)

    2010-09-15

    ...-AA00 Safety Zone; Illinois River, Mile 000.5 to 001.5 AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary safety zone for all waters of the Illinois River, Mile 000.5 to 001.5, extending the entire width of the river. This safety zone is needed to...

  1. 75 FR 53193 - Safety Zone; Mississippi River, Mile 427.3 to 427.5

    Science.gov (United States)

    2010-08-31

    ... Zone; Mississippi River, Mile 427.3 to 427.5 AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary safety zone for all waters of the Upper Mississippi River, Mile 427.3 to 427.5, extending the entire width of the river. This safety zone is needed to...

  2. 75 FR 41764 - Safety Zone; Mississippi River, Mile 840.0 to 839.8

    Science.gov (United States)

    2010-07-19

    ...-AA00 Safety Zone; Mississippi River, Mile 840.0 to 839.8 AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coat Guard is establishing a temporary safety zone for all waters of the Upper Mississippi River, Mile 840.0 to 839.8, extending the entire width of the river. This safety zone is needed to...

  3. 76 FR 20532 - Safety Zone; Boom Days, Niagara River, Niagara Falls, NY

    Science.gov (United States)

    2011-04-13

    ...-AA00 Safety Zone; Boom Days, Niagara River, Niagara Falls, NY AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary safety zone on the Niagara River... Marina and a portion of the Niagara River, Niagara Falls, NY during the Boom Days Fireworks on April 16...

  4. 78 FR 24677 - Safety Zone; XA The Experimental Agency Fireworks, Pier 34, East River, NY

    Science.gov (United States)

    2013-04-26

    ... Final Rule This rule establishes a temporary safety zone on the navigable waters of the East River, in... Fireworks, Pier 34, East River, NY. (a) Regulated Area. The following area is a temporary safety zone: all... 1625-AA00 Safety Zone; XA The Experimental Agency Fireworks, Pier 34, East River, NY AGENCY: Coast...

  5. Final Performance Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Houldin, Joseph [Delaware Valley Industrial Resource Center, Philadelphia, PA (United States); Saboor, Veronica [Delaware Valley Industrial Resource Center, Philadelphia, PA (United States)

    2016-03-30

    The Accelerator has given the DVIRC an opportunity to get involved in areas of a small and medium-sized manufacturing business that MEP centers typically do not get involved in—the areas of technology development and technical issues. Over the course of the project we’ve come to gain some valuable insights into the market challenges of SMEs, and the market challenges an MEP (such as DVIRC) faces as it seeks to work more deeply and at faster pace on the technology-related aspects of a manufacturing business. For example, while most companies can quantitatively justify investing in an ERP system or a new piece of production equipment, SMEs often struggle with formulating a return-on-investment for advanced technologies. As another example, bringing advanced technology to a company through the individuals interested in the technology (such as engineers or technicians) is not the way to go; as with many MEP services, we need to get to the CEO. And even then, there is a strong reluctance to let outsiders in to these often proprietary areas of the business. As a result of our work in this area, we are now looking more closely at how CEOs that DO invest in advanced technologies justify the investment or make the investment decision. We’ve learned about some of the internal constraints in SMEs that need to be kept in mind as projects get defined and executed—where technical personnel often hinder conversations in this arena rather than contributing value to them. We’ve gained exposure to a new suite of public and private assets that can help us with this work, such as universities and agencies such as NASA. We have also developed relationships with design/engineering companies that can help us as we move more deeply into this area of a company,. Still, defining a technical project takes a huge amount of effort and resources and, once undertaken, has a much longer time trajectory than typical MEP projects. DVIRC field staff and content experts have learned more

  6. Columbia River Basin Seasonal Volumes and Statistics, 1928-1989. 1990 Level Modified Streamflows Computed Seasonal Volumes 61-Year Statistics.

    Energy Technology Data Exchange (ETDEWEB)

    A.G. Crook Company

    1993-04-01

    This report was prepared by the A.G. Crook Company, under contract to Bonneville Power Administration, and provides statistics of seasonal volumes and streamflow for 28 selected sites in the Columbia River Basin.

  7. 76 FR 30397 - Faribault Woolen Mill Company, Faribault, MN; Faribo Woolens, Inc., a Related Company of...

    Science.gov (United States)

    2011-05-25

    ... Woolen Mill Company, Faribault, MN; Faribo Woolens, Inc., a Related Company of Faribault Woolen Mill... December 9, 2009, applicable to workers of Faribault Woolen Mill Company, Faribault, Minnesota. The notice... Mill Company, a retail outlet store for the subject firm, Faribault Woolen Mill Company. Accordingly...

  8. Allegheny County Major Rivers

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset contains locations of major rivers that flow through Allegheny County. These shapes have been taken from the Hydrology dataset. The Ohio River,...

  9. Measuring river from the cloud - River width algorithm development on Google Earth Engine

    Science.gov (United States)

    Yang, X.; Pavelsky, T.; Allen, G. H.; Donchyts, G.

    2017-12-01

    Rivers are some of the most dynamic features of the terrestrial land surface. They help distribute freshwater, nutrients, sediment, and they are also responsible for some of the greatest natural hazards. Despite their importance, our understanding of river behavior is limited at the global scale, in part because we do not have a river observational dataset that spans both time and space. Remote sensing data represent a rich, largely untapped resource for observing river dynamics. In particular, publicly accessible archives of satellite optical imagery, which date back to the 1970s, can be used to study the planview morphodynamics of rivers at the global scale. Here we present an image processing algorithm developed using the Google Earth Engine cloud-based platform, that can automatically extracts river centerlines and widths from Landsat 5, 7, and 8 scenes at 30 m resolution. Our algorithm makes use of the latest monthly global surface water history dataset and an existing Global River Width from Landsat (GRWL) dataset to efficiently extract river masks from each Landsat scene. Then a combination of distance transform and skeletonization techniques are used to extract river centerlines. Finally, our algorithm calculates wetted river width at each centerline pixel perpendicular to its local centerline direction. We validated this algorithm using in situ data estimated from 16 USGS gauge stations (N=1781). We find that 92% of the width differences are within 60 m (i.e. the minimum length of 2 Landsat pixels). Leveraging Earth Engine's infrastructure of collocated data and processing power, our goal is to use this algorithm to reconstruct the morphodynamic history of rivers globally by processing over 100,000 Landsat 5 scenes, covering from 1984 to 2013.

  10. COMPARATIVE STUDY: LIMITED LIABILITY COMPANY VERSUS UNLIMITED LIABILITY COMPANY

    Directory of Open Access Journals (Sweden)

    Silvia Cristea

    2013-11-01

    Full Text Available Our goal is to differentiate between the legal regime of the limited partnership and that of the unlimited company, by drawing a comparison between civil and special settlement in terms of the following criteria: definition, contributions, capital divisions, the Articles of Association, registration, management control, withdrawal/exclusion of a partner, dissolution/ liquidation. The opinions expressed in the chapter devoted to conclusions are relevant to Romanian and French Law as well.

  11. 78 FR 11638 - Michigan Consolidated Gas Company, DTE Gas Company, DTE Gas Company; Notice of Petition

    Science.gov (United States)

    2013-02-19

    ... corporate name change from MichCon to DTE Gas, and pursuant to section 284.123 of the Commissions... Gas Company (DTE Gas) filed to institute a name change to both itself from MichCon to DTE Gas and to...

  12. The sustainable company: new challenges and strategies for more sustainability

    Directory of Open Access Journals (Sweden)

    Victor DANCIU

    2013-09-01

    Full Text Available The sustainability becomes a model of development only if countries, industries, businesses and citizens become sustainable. The contribution of the business to a promising future should come from a fully integrated sustainability in its DNA and strategies.This paper focuses on the needed sustainable strategies for scaling up the contribution of the companies to sustainable development in the future. At the beginning, we analyze the main theoretical points of view on sustainability. Then, we explain how companies could achieve the sustainability by following the steps of a difficult process and the present performances in sustainability of large companies around the world. Finally, we suggest four strategies that businesses could design and implement in order to scaling up their sustainability in the future.The research has two important conclusions on sustainability in business. One is that the sustainability pays off if it is integrated in the DNA of the companies. The other conclusion says that the companies will succeed to make the needed transformation for achieving a better sustainability in the future only if they design and perform strategies focused on improving sustainability.

  13. WHY DO COMPANIES FROM EMERGING COUNTRIES MANAGE EARNINGS?

    Directory of Open Access Journals (Sweden)

    Susana Callao

    2017-06-01

    Full Text Available This paper provides evidence in terms of the incentives which lead managers from emerging European countries to manage earnings. In particular, we focused on four Eastern European countries: the Czech Republic, Poland, Hungary and Slovakia, as the majority of studies on earnings management in developing countries were based on the Asian emerging market. The market of developing European countries is still barely explored. After we confirmed that managers from emerging European companies manage earnings, we find that within the different incentives which lead managers to earnings management, the avoidance of debt covenants violations is a strong incentive for managers. Additionally, those firms considered as poor investments (with less value have incentives to manage earnings down as a consequence to opt for market niche. Moreover, emerging Eastern European companies have incentives to flatten earnings of current periods in order to benefit in the future as the source of future nonmanipulated earnings will be insufficient, as they may expect reduced, or at least lower future performance of their companies affected by increasing global competition. Finally, we confirm that privately-owned companies tend to maximize accounting earnings more than state-owned companies because they are in a weaker position related to a specific political and historical factors.

  14. Natural gas annual 1993 supplement: Company profiles

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. This report, the Natural Gas Annual 1993 Supplement: Company Profiles, presents a detailed profile of 45 selected companies in the natural gas industry. The purpose of this report is to show the movement of natural gas through the various States served by the companies profiled. The companies in this report are interstate pipeline companies or local distribution companies (LDC`s). Interstate pipeline companies acquire gas supplies from company owned production, purchases from producers, and receipts for transportation for account of others. Pipeline systems, service area maps, company supply and disposition data are presented.

  15. Assessment of possible usages of fuels alternatives to diesel by maritime, road and river freight transport professionals. Gas-based motorizations, strategic investments for the energy transition of road and maritime freight transport companies within the frame of the 2014/94/EU directive of 22 October 2014

    International Nuclear Information System (INIS)

    Erhardt, Jean-Bernard; Maler, Philippe

    2017-05-01

    As the 2014/94/EU directive defines alternative fuels (electric power, natural gas under its gaseous and liquefied form, biofuels, liquefied petrol gas or LPG, hydrogen, synthetic fuels, and paraffinic fuels), and states the obligation for member states to develop distribution infrastructures for these fuels, this report addresses fuels which cannot be mixed with diesel fuel and thus require the modification of transport equipment and the development of a new distribution infrastructure, technically different from that for oil-derived fuels. It describes technical and economic characteristics of French freight transport companies, public policies aimed at an energy transition of these companies, and alternate fuels defined by the European directive. Then, it proposes an overview of the status of perspectives of development of alternative motorizations for four types of equipment used in freight transport: freight transport ships, industrial vehicles, light commercial vehicles, and inland vessels

  16. Flowing with Rivers

    Science.gov (United States)

    Anderson, Heather

    2004-01-01

    This article describes a lesson in which students compare how artists have depicted rivers in paintings, using different styles, compositions, subject matter, colors, and techniques. They create a watercolor landscape that includes a river. Students can learn about rivers by studying them on site, through environmental study, and through works of…

  17. Effects of distances and company resources for enterprise export performance

    Directory of Open Access Journals (Sweden)

    Givanildo Silva

    2015-12-01

    Full Text Available The purpose of this article is to evaluate the effect of distance on the export performance of companies in Santa Catarina, and to what extent this effect is moderated by organizational resource characteristics. Multiple linear regression and variance analysis were used for a perception survey of export managers with a final sample of 49 exporting producers. The constructs showed internal validity and allowed the data to be analyzed. The results only revealed evidence regarding the effect of psychic distance, showing a positive relationship with export performance. Also, the model estimation showed that the organization's resources moderate the relation between distance and export performance. Finally the study also shows that the export team and the organizational structure moderate the effect of distance on the performance and future performance expectations of the companies.

  18. Uncertainty Quantification of Water Quality in Tamsui River in Taiwan

    Science.gov (United States)

    Kao, D.; Tsai, C.

    2017-12-01

    In Taiwan, modeling of non-point source pollution is unavoidably associated with uncertainty. The main purpose of this research is to better understand water contamination in the metropolitan Taipei area, and also to provide a new analysis method for government or companies to establish related control and design measures. In this research, three methods are utilized to carry out the uncertainty analysis step by step with Mike 21, which is widely used for hydro-dynamics and water quality modeling, and the study area is focused on Tamsui river watershed. First, a sensitivity analysis is conducted which can be used to rank the order of influential parameters and variables such as Dissolved Oxygen, Nitrate, Ammonia and Phosphorous. Then we use the First-order error method (FOEA) to determine the number of parameters that could significantly affect the variability of simulation results. Finally, a state-of-the-art method for uncertainty analysis called the Perturbance moment method (PMM) is applied in this research, which is more efficient than the Monte-Carlo simulation (MCS). For MCS, the calculations may become cumbersome when involving multiple uncertain parameters and variables. For PMM, three representative points are used for each random variable, and the statistical moments (e.g., mean value, standard deviation) for the output can be presented by the representative points and perturbance moments based on the parallel axis theorem. With the assumption of the independent parameters and variables, calculation time is significantly reduced for PMM as opposed to MCS for a comparable modeling accuracy.

  19. Company Portfolios Answer the Question: What Do You Know about My Company?

    Science.gov (United States)

    Watson, Michelle L.

    2001-01-01

    Job seekers can demonstrate their knowledge of a potential employer by developing a company portfolio. Elements include company history, mission, values, and goals; size and location(s); financial status; and recent changes in the company and industry. (SK)

  20. Royal Dutch Petroleum Company annual report 1992

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The Royal Dutch Petroleum Company has no operations of its own and virtually the whole of its income derives from its 60% interest in the companies known collectively as the Royal Dutch/Shell Group of Companies; the other 40% is owned by the Shell Transport and Trading Company, p.l.c. The company is engaged in the oil, natural gas, chemicals, coal and metals businesses throughout the world. The annual report summarises the year's results and analyses earnings in each industry segment. Financial statements for the year ended 31 December 1992 are presented. The Group companies' estimated net quantities of crude oil, natural gas and coal are given