WorldWideScience

Sample records for risk reduction project

  1. Sound transit climate risk reduction project.

    Science.gov (United States)

    2013-09-01

    The Climate Risk Reduction Project assessed how climate change may affect Sound Transit commuter rail, light rail, and express bus : services. The project identified potential climate change impacts on agency operations, assets, and long-term plannin...

  2. Risk reduction of international mining projects by means of investor consortia and diversification of external financing

    International Nuclear Information System (INIS)

    Kirchner, C.

    1982-01-01

    Investors and creditors of international mining projects bear specific risks which may be reduced by means of forming investor and financing consortia. Risk is defined for each actor separately. Project risk and investor risk respectively credit risk are useful categories in order to analyze risk reduction. In each case formation of consortia has a positive influence on the economic viability of the project, and thus reduces the project risk. Furthermore, formation of consortia leads to better compliance of the host country of the mining project with the project and financing agreements. Thus, investor and credit risk may be reduced. (orig.) [de

  3. 41 CFR 102-80.55 - Are Federal agencies responsible for managing the execution of risk reduction projects?

    Science.gov (United States)

    2010-07-01

    ... Management Risks and Risk Reduction Strategies § 102-80.55 Are Federal agencies responsible for managing the... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are Federal agencies responsible for managing the execution of risk reduction projects? 102-80.55 Section 102-80.55 Public...

  4. Reduction of radiation risks in patients undergoing some X-ray examinations by using optimal projections: A Monte Carlo program-based mathematical calculation

    Directory of Open Access Journals (Sweden)

    A Chaparian

    2014-01-01

    Full Text Available The objectives of this paper were calculation and comparison of the effective doses, the risks of exposure-induced cancer, and dose reduction in the gonads for male and female patients in different projections of some X-ray examinations. Radiographies of lumbar spine [in the eight projections of anteroposterior (AP, posteroanterior (PA, right lateral (RLAT, left lateral (LLAT, right anterior-posterior oblique (RAO, left anterior-posterior oblique (LAO, right posterior-anterior oblique (RPO, and left posterior-anterior oblique (LPO], abdomen (in the two projections of AP and PA, and pelvis (in the two projections of AP and PA were investigated. A solid-state dosimeter was used for the measuring of the entrance skin exposure. A Monte Carlo program was used for calculation of effective doses, the risks of radiation-induced cancer, and doses to the gonads related to the different projections. Results of this study showed that PA projection of abdomen, lumbar spine, and pelvis radiographies caused 50%-57% lower effective doses than AP projection and 50%-60% reduction in radiation risks. Also use of LAO projection of lumbar spine X-ray examination caused 53% lower effective dose than RPO projection and 56% and 63% reduction in radiation risk for male and female, respectively, and RAO projection caused 28% lower effective dose than LPO projection and 52% and 39% reduction in radiation risk for males and females, respectively. About dose reduction in the gonads, using of the PA position rather than AP in the radiographies of the abdomen, lumbar spine, and pelvis can result in reduction of the ovaries doses in women, 38%, 31%, and 25%, respectively and reduction of the testicles doses in males, 76%, 86%, and 94%, respectively. Also for oblique projections of lumbar spine X-ray examination, with employment of LAO rather than RPO and also RAO rather than LPO, demonstrated 22% and 13% reductions to the ovaries doses and 66% and 54% reductions in the

  5. Goals and activities of the JICA technical cooperation project on reduction of seismic risk in Romania

    International Nuclear Information System (INIS)

    Vacareanu, R.; Kato, H.

    2007-01-01

    Japan International Cooperation Agency (JICA) Technical Cooperation Project on Reduction of Seismic Risk for Buildings and Structures started in Romania on October 1, 2002. The aim of the Project is to strengthen the capacity of earthquake disaster related activities in Romania. The Project approval is the result of four years of intensive efforts made by professionals from Technical University of Civil Engineering Bucharest (UTCB), Ministry of Transport, Constructions and Tourism (MTCT), Romania, National Building Research Institute (INCERC) Bucharest, JICA, Building Research Institute (BRI), Tsukuba, and National Institute for Land, Infrastructure and Management (NILIM), Tsukuba, Japan. The duration of the Project is five years. The implementing agency is the National Center for Seismic Risk Reduction (NCSRR) as a public institution of national interest under MTCT. The activities are carried out by NCSRR in partnership with UTCB and INCERC. During the Project period, 29 young Romanian engineers were trained in Japan, 7 Japanese experts and 37 Japanese experts worked for long-term and short-term, respectively in Romania. Equipment for seismic instrumentation, dynamic characterization of soil and structural testing rising up approximately to 260 million yens (i.e. 2.17 million USD) were donated by JICA to Romania, through NCSRR. The total cost of the Project is roughly 7 million USD. The paper describes the main activities and results of the Project until the JICA Final Evaluation Mission (March 2007). (authors)

  6. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  7. The Global Earthquake Model and Disaster Risk Reduction

    Science.gov (United States)

    Smolka, A. J.

    2015-12-01

    Advanced, reliable and transparent tools and data to assess earthquake risk are inaccessible to most, especially in less developed regions of the world while few, if any, globally accepted standards currently allow a meaningful comparison of risk between places. The Global Earthquake Model (GEM) is a collaborative effort that aims to provide models, datasets and state-of-the-art tools for transparent assessment of earthquake hazard and risk. As part of this goal, GEM and its global network of collaborators have developed the OpenQuake engine (an open-source software for hazard and risk calculations), the OpenQuake platform (a web-based portal making GEM's resources and datasets freely available to all potential users), and a suite of tools to support modelers and other experts in the development of hazard, exposure and vulnerability models. These resources are being used extensively across the world in hazard and risk assessment, from individual practitioners to local and national institutions, and in regional projects to inform disaster risk reduction. Practical examples for how GEM is bridging the gap between science and disaster risk reduction are: - Several countries including Switzerland, Turkey, Italy, Ecuador, Papua-New Guinea and Taiwan (with more to follow) are computing national seismic hazard using the OpenQuake-engine. In some cases these results are used for the definition of actions in building codes. - Technical support, tools and data for the development of hazard, exposure, vulnerability and risk models for regional projects in South America and Sub-Saharan Africa. - Going beyond physical risk, GEM's scorecard approach evaluates local resilience by bringing together neighborhood/community leaders and the risk reduction community as a basis for designing risk reduction programs at various levels of geography. Actual case studies are Lalitpur in the Kathmandu Valley in Nepal and Quito/Ecuador. In agreement with GEM's collaborative approach, all

  8. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  9. The RACER (risk analysis, communication, evaluation, and reduction) stakeholder environmental data transparency project for Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Echohawk, John Chris; Dorries, Alison M.; Eberhart, Craig F.; Werdel, Nancy

    2008-01-01

    The RACER (Risk Analysis, Communication, Evaluation, and Reduction) project was created in 2003, as an effort to enhance the Los Alamos National Laboratory's ability to effectively communicate the data and processes used to evaluate environmental risks to the public and the environment. The RACER project staff consists of members of Risk Assessment Corporation, Los Alamos National Laboratory (LANL), and the New Mexico Environment Department (NMED). RACER staff worked closely with members of the community, tribal governments, and others within NMED and LANL to create innovative tools and a process that could provide information to regulators, LANL and the community about the sources of public health risk and ecological impact from LAN L operations. The RACER Data Analysis Tool (DA T) provides the public with webbased access to environmental measurement data collected in and around the LANL site. Its purpose is to provide a 'transparent' view to the public of all data collected by LANL and NMED regarding the LANL site. The DAT is available to the public at 'www.racernm.com'.

  10. Risk-informed ranking of engineering projects

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2011-01-01

    Refurbishment planning requires prudent investment decisions with respect to the various systems and components at the station. These decisions are influenced by many factors, including engineering, safety, regulatory, economic, and political constraints. From an engineering perspective, the concept of cost-benefit analysis is a common way to allocate capital among various projects. Naturally, the 'best' or optimal project should have the lowest cost and the highest benefit. In the context of risk-informed decision making (RIDM), a process that has been widely embraced by the global nuclear community, the costs and benefits must further be 'weighted' by probabilities to estimate the underlying risk associated with the various planning alternatives. The main purpose of this study is to illustrate how risk and reliability information can be integrated into the refurbishment planning process to facilitate more objective and transparent investment decisions. The methodology is based on the concept of generation risk assessment (GRA) which provides a systematic approach for balancing investment costs with the reduction in overall financial risk. In addition to reliability predictions, the model provides estimates for the level of risk reduction associated with each system/project and also the break-even point for investment. This information is vital for project ranking, and helps to address the key question of whether capital investment should be made in the most risk critical systems, or in systems that reduce the overall risk the most. The application of the proposed methodology requires only basic information regarding the current reliability of each engineering system, which should be readily available from plant records and routine condition assessments. Because the methodology can be readily implemented in a Microsoft Excel spreadsheet, all plausible (e.g., bounding) planning scenarios, with or without investment, can also be generated quickly and easily, while

  11. The role of service learning in teaching and research for disaster-risk reduction

    Science.gov (United States)

    Suckale, J.; Saiyed, Z.; Alvisyahrin, T.; Hilley, G. E.; Muhari, A.; Zoback, M. L. C.; Truebe, S.

    2016-12-01

    An important motivation for natural-hazards research is to reduce threats posed by natural disasters to at-risk communities. Yet, we rarely teach students how research may be used to construct implementable solutions that reduce disaster risk. The goal of this contribution is to evaluate the potential of service learning to impart students with both the scientific background and the skills necessary to navigate real-world constraints of disaster risk reduction. We present results from a service-learning class taught at Stanford in the Winter quarter of 2016 in collaboration with the Indonesian Ministry of Marine Affairs and Fisheries and Syiah Kuala University, Banda Aceh. The main deliverable of the class was a final project in which students developed a specific idea of how to contribute to tsunami-risk reduction in Indonesia. A common critique of the service-learning approach posits that it may implicitly embed social and political perspectives within risk-reduction strategies that may be inappropriate within a particular culture. We attempted to avoid this problem using three strategies: First, we paired students from Stanford with students at Syiah Kuala University, Banda Aceh, to facilitate a close dialogue. Second, the Ministry of Marine Affairs and Fisheries provided a list of current risk-reduction strategies without requiring students to contribute to one specific project to minimally precondition project suggestions. Third, our community partners provided ongoing feedback on the scope and feasibility of the proposed projects and students were assessed based on their ability to integrate the feedback. Preliminary results from our class suggest significant promise for a service-learning approach to teaching disaster-risk reduction. There was substantial student interest in service learning, particularly among undergraduates. Pre-and post-assessment surveys showed that over 75% of students adjusted previous notions about disaster-risk reduction during the

  12. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  13. Clean development mechanism projects and portfolio risks

    International Nuclear Information System (INIS)

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  14. A Best Practices Notebook for Disaster Risk Reduction and Climate Change Adaptation: Guidance and Insights for Policy and Practice from the CATALYST Project

    NARCIS (Netherlands)

    Hare, M.; Bers, van C.; Mysiak, J.; Calliari, E.; Haque, A.; Warner, K.; Yuzva, K.; Zissener, M.; Jaspers, A.M.J.; Timmerman, J.G.

    2014-01-01

    This publication, A Best Practices Notebook for Disaster Risk Reduction and Climate Change Adaptation: Guidance and Insights for Policy and Practice from the CATALYST Project is one of two main CATALYST knowledge products that focus on the transformative approaches and measures that can support

  15. Educational project on risk communication and reduction of the radon exposure in buildings

    International Nuclear Information System (INIS)

    Conrady, J.; Guhr, A.; Uhlig, R.

    2009-01-01

    The radon exposure in buildings is supposed to be the most important risk factor of lung cancer. In Saxony about 800 000 persons live in apartments with high radon exposure. The study discusses the effects of an educational project to communicate the facts on radon exposure in buildings and to develop risk awareness and individual initiatives to reduce the radon concentration. The project includes support and encouragement with respect of preventive and protective measures to improve the individual situation. Further items cover requirements for control and quantification of intervention impacts, development and optimization of specific strategies for a permanent risk communication in schools. Results of the pilot study are summarized.

  16. Project identification for methane reduction options

    Energy Technology Data Exchange (ETDEWEB)

    Kerr, T.

    1996-12-31

    This paper discusses efforts directed at reduction in emission of methane to the atmosphere. Methane is a potent greenhouse gas, which on a 20 year timeframe may present a similar problem to carbon dioxide. In addition, methane causes additional problems in the form of smog and its longer atmospheric lifetime. The author discusses strategies for reducing methane emission from several major sources. This includes landfill methane recovery, coalbed methane recovery, livestock methane reduction - in the form of ruminant methane reduction and manure methane recovery. The author presents examples of projects which have implemented these ideas, the economics of the projects, and additional gains which come from the projects.

  17. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  18. Eighteenth annual risk reduction engineering laboratory research symposium

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The Eighteenth Annual Risk Reduction Engineering Laboratory Research Symposium was held in Cincinnati, Ohio, April 14-16, 1992. The purpose of this Symposium was to present the latest significant research findings from ongoing and recently completed projects funded by the Risk Reduction Engineering Laboratory (RREL). These Proceedings are organized into two sections. Sessions A and B, which contain extended abstracts of the paper presentations. A list of poster displays is also included. Subjects include remedial action, treatment, and control technologies for waste disposal, landfill liner and cover systems, underground storage tanks, and demonstration and development of innovative/alternative treatment technologies for hazardous waste. Alternative technology subjects include thermal destruction of hazardous wastes, field evaluations, existing treatment options, emerging treatment processes, waste minimization, and biosystems for hazardous waste destruction

  19. Household flood risk reduction in the Czech Republic

    Czech Academy of Sciences Publication Activity Database

    Duží, Barbora; Vikhrov, Dmytro; Kelman, I.; Stojanov, Robert; Jakubínský, Jiří

    2015-01-01

    Roč. 18, č. 8 (2015), s. 1-6 ISSN 1381-2386 R&D Projects: GA MŠk(CZ) EE2.4.31.0056; GA MŠk(CZ) LD13032; GA MŠk(CZ) LD13033 Institutional support: RVO:67179843 Keywords : Bečva River Basin * Czech Republic * flood risk reduction * floods * household adaptation * household coping Subject RIV: AO - Sociology, Demography Impact factor: 3.085, year: 2015

  20. Absolute risk, absolute risk reduction and relative risk

    Directory of Open Access Journals (Sweden)

    Jose Andres Calvache

    2012-12-01

    Full Text Available This article illustrates the epidemiological concepts of absolute risk, absolute risk reduction and relative risk through a clinical example. In addition, it emphasizes the usefulness of these concepts in clinical practice, clinical research and health decision-making process.

  1. A Dutch Perspective on Coastal Louisiana Flood Risk Reduction and Landscape Stabilization

    National Research Council Canada - National Science Library

    Dijkman, Jos

    2007-01-01

    .... The project was aimed at identifying options for the long-term reduction of flood risks and landscape stabilization in Planning Areas I and 2 in Louisiana, in the framework of the Louisiana Coastal...

  2. CONDITIONS OF SUSTAINABILITY OF INVESTMENT BUILDING PROJECTS BASED ON THE RISK MANAGEMENT CONCEPT

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2012-10-01

    minimization of risky situations requires reduction of the project implementation period; development of domestic methodologies and standards of project risk management tailored to the conditions of our construction industry is a relevant assignment.

  3. Project risk definition and measurement in a not-for-profit setting.

    Science.gov (United States)

    Gapenski, L C

    1992-11-01

    The health care finance literature on capital investment decisions generally applies conventional market risk concepts without distinguishing between proprietary and not-for-profit forms of organization. Since proprietary firms have shareholder wealth maximization as their primary goal, a project's relevant risk is its contribution to the riskiness of the equity investors' well diversified stock portfolios, or its market risk. However, not-for-profit organizations do not have shareholder wealth maximization as their primary goal, and thus market risk concepts are not applicable. Rather, the relevant risk in a not-for-profit setting is a project's corporate risk; that is, the project's contribution to the riskiness of the organization. The difference in risk definition and measurement between proprietary and not-for-profit firms has two implications for managerial decisions: (1) in making capital investment decisions, a manager must define and measure a project's riskiness on the basis of the firm's organizational form; and (2) although diversification for the sole purpose of risk reduction is not a valid rationale for proprietary firms because stockholders can achieve the same result at less cost, risk-reducing diversification does make sense for not-for-profit firms.

  4. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  5. Constructing a holistic approach to disaster risk reduction: the significance of focusing on vulnerability reduction.

    Science.gov (United States)

    Palliyaguru, Roshani; Amaratunga, Dilanthi; Baldry, David

    2014-01-01

    As a result of the increase in natural disaster losses, policy-makers, practitioners, and members of the research community around the world are seeking effective and efficient means of overcoming or minimising them. Although various theoretical constructs are beneficial to understanding the disaster phenomenon and the means of minimising losses, the disaster risk management process becomes less effective if theory and practice are set apart from one another. Consequently, this paper seeks to establish a relationship between two theoretical constructs, 'disaster risk reduction (DRR)' and 'vulnerability reduction', and to develop a holistic approach to DRR with particular reference to improving its applicability in practical settings. It is based on a literature review and on an overall understanding gained through two case studies of post-disaster infrastructure reconstruction projects in Sri Lanka and three expert interviews in Sri Lanka and the United Kingdom. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.

  6. Perceptions of farmers on health risks and risk reduction measures in wastewater-irrigated urban vegetable farming in Ghana

    DEFF Research Database (Denmark)

    Keraita, Bernard; Drechsel, Pay; Konradsen, Flemming

    2008-01-01

    , authorities and the general public, especially if they had some incentives. These findings demonstrate the need to involve farmers as early as possible in intervention projects especially in informal farming practices, like urban agriculture, where restrictions are difficult to implement. This will ensure......Most irrigation water used in urban vegetable farming in Ghana is contaminated with untreated wastewater. This poses health risks to farmers and consumers. As part of a study to explore options for health risk reduction, this paper summarizes farmers' perceptions on health risks and possible risk...

  7. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    Directory of Open Access Journals (Sweden)

    Jovanović Filip P.

    2016-01-01

    Full Text Available This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reduction of the quantity of coke, whose production requires large amounts of energy, reduction of harmful exhaust emission and increase productivity of blast furnaces through the reduction of production costs. The project was complex and had high costs, so that it was necessary to predict risk events and plan responses to identified risks at an early stage of implementation, in the course of the project design, in order to minimise losses and implement the project in accordance with the defined time and cost limitations. [Projekat Ministarstva nauke Republike Srbije, br. 179081: Researching contemporary tendencies of strategic management using specialized management disciplines in function of competitiveness of Serbian economy

  8. Strip reduction testing of lubricants developed during ENFORM project

    DEFF Research Database (Denmark)

    Gazvoda, S.; Andreasen, Jan Lasson; Olsson, David Dam

    Strip reduction testing of lubricants developed during ENFORM project. Experiments were conducted with the strip reduction test [1] in order to classify experimental lubricants, developed during concerned project. One reference lubricant was used during testing....

  9. Indigenous knowledge for disaster risk reduction: An African perspective

    Directory of Open Access Journals (Sweden)

    Nnamdi G. Iloka

    2016-07-01

    Full Text Available Indigenous knowledge is valuable knowledge that has helped local communities all over the world survive for generations. This knowledge originates from the interaction between members of the community and the environment in which they live. Although much has been written about indigenous knowledge, its documentation in the area of disaster risk reduction and climate change in Africa has been very limited. The wealth of this knowledge has not been well-recognised in the disaster risk reduction field, as policy-makers still rely on mitigation strategies based on scientific knowledge. Colonialism and lack of proper documentation of indigenous knowledge are some of the contributing factors to this. Ignoring the importance of understanding adaptive strategies of the local people has led to failed projects. Understanding how local people in Africa have managed to survive and adapt for generations, before the arrival of Western education, may be the key to developing sustainable policies to mitigate future challenges. Literature used in this article, obtained from the books, papers and publications of various experts in the fields of disaster risk reduction, climate change, indigenous knowledge and adaptation, highlight the need for more interest to be shown in indigenous knowledge, especially in the developing country context. This would lead to better strategies which originate from the community level but would aim for overall sustainable development in Africa.

  10. Risk management for engineering projects procedures, methods and tools

    CERN Document Server

    Munier, Nolberto

    2014-01-01

    Many people see risk in engineering projects as an imprecise and nebulous problem - something that exists, is feared and is impossible to deal with. Nothing could be further from the truth. While risk is certainly ubiquitous, sometimes difficult to detect, and cannot always be completely avoided, it can generally be mitigated, reduced or prevented through timely analysis and action.   This book covers the entire process of risk management by providing methodologies for determining the sources of project risk, and once threats have been identified, managing them through:   ·         identification and assessment (probability, relative importance, variables, risk breakdown structure, etc.) ·         implementation of measures for their prevention, reduction or mitigation ·         evaluation of impacts and quantification of risks ·         establishment of control measures   It also considers sensitivity analysis to determine the influence of uncertain parameters values ...

  11. Evaluation of a Peer-Led Drug Abuse Risk Reduction Project for Runaway/Homeless Youths.

    Science.gov (United States)

    Fors, Stuart W.; Jarvis, Sara

    1995-01-01

    Evaluates the Drug Prevention in Youth risk reduction program that was implemented in shelters for runaway/homeless youths in the southeastern United States. An evaluation strategy was developed allowing for comparisons between peer-led, adult-led and nonintervention groups. Well-trained and motivated peer/near-peer leaders made particularly…

  12. Reductions in Transmission Risk Behaviors in HIV-Positive Clients Receiving Prevention Case Management Services: Findings from a Community Demonstration Project

    Science.gov (United States)

    Gasiorowicz, Mari; Llanas, Michelle R.; DiFranceisco, Wayne; Benotsch, Eric G.; Brondino, Michael J.; Catz, Sheryl L.; Hoxie, Neil J.; Reiser, William J.; Vergeront, James M.

    2005-01-01

    Prevention case management (PCM) for HIV-infected persons is an HIV risk reduction intervention designed to assist clients who are aware of their HIV infection and who continue to engage in risk transmission behaviors. PCM combines individual risk reduction counseling with case management to address the psychosocial factors affecting HIV…

  13. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  14. Optimising risk reduction: An expected utility approach for marginal risk reduction during regulatory decision making

    International Nuclear Information System (INIS)

    Li Jiawei; Pollard, Simon; Kendall, Graham; Soane, Emma; Davies, Gareth

    2009-01-01

    In practice, risk and uncertainty are essentially unavoidable in many regulation processes. Regulators frequently face a risk-benefit trade-off since zero risk is neither practicable nor affordable. Although it is accepted that cost-benefit analysis is important in many scenarios of risk management, what role it should play in a decision process is still controversial. One criticism of cost-benefit analysis is that decision makers should consider marginal benefits and costs, not present ones, in their decision making. In this paper, we investigate the problem of regulatory decision making under risk by applying expected utility theory and present a new approach of cost-benefit analysis. Directly taking into consideration the reduction of the risks, this approach achieves marginal cost-benefit analysis. By applying this approach, the optimal regulatory decision that maximizes the marginal benefit of risk reduction can be considered. This provides a transparent and reasonable criterion for stakeholders involved in the regulatory activity. An example of evaluating seismic retrofitting alternatives is provided to demonstrate the potential of the proposed approach.

  15. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  16. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  17. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  18. Comparison of additive (absolute) risk projection models and multiplicative (relative) risk projection models in estimating radiation-induced lifetime cancer risk

    International Nuclear Information System (INIS)

    Kai, Michiaki; Kusama, Tomoko

    1990-01-01

    Lifetime cancer risk estimates depend on risk projection models. While the increasing lengths of follow-up observation periods of atomic bomb survivors in Hiroshima and Nagasaki bring about changes in cancer risk estimates, the validity of the two risk projection models, the additive risk projection model (AR) and multiplicative risk projection model (MR), comes into question. This paper compares the lifetime risk or loss of life-expectancy between the two projection models on the basis of BEIR-III report or recently published RERF report. With Japanese cancer statistics the estimates of MR were greater than those of AR, but a reversal of these results was seen when the cancer hazard function for India was used. When we investigated the validity of the two projection models using epidemiological human data and animal data, the results suggested that MR was superior to AR with respect to temporal change, but there was little evidence to support its validity. (author)

  19. Outage risk reduction at Diablo Canyon

    International Nuclear Information System (INIS)

    Burnett, Tobias W.T.; Eugene Newman, C.

    2004-01-01

    A formal risk reduction program was conducted at the Diablo Canyon Nuclear Generating plant as part of EPRI's Outage Risk Assessment and Management Program. The program began with a probabilistic and deterministic assessment of the frequency of core coolant boiling and core uncovery during shutdown operations. This step identified important contributors to risk, periods of high vulnerability, and potential mechanisms for reducing risk. Next, recovery strategies were evaluated and procedures, training, and outage schedules modified. Twelve risk reduction enhancements were developed and implemented. These enhancements and their impact are described in this paper. These enhancements reduced the calculated risk of core uncovery by about a factor of four for a refueling outage without lengthening the outage schedule; increased the outage efficiency, contributing to completing 11 days ahead of schedule; and helped to earn the highest achievable SALP rating from the NRC. (author)

  20. U.S. Coastal Flood Damage Reduction Projects: Federal Authorization and Investment Trends

    Science.gov (United States)

    Carter, N. T.

    2015-12-01

    The 2015 U.S. Environmental Protection Agency report Climate Change in the United States: Benefits of Global Action estimated the potential cumulative future economic impacts of storm surge and sea-level rise on U.S. coasts during this century at 5 trillion (2014 dollars) if no adaptation measures are implemented. These impacts drop to 0.8 trillion if investments are made in cost-effective adaptations and protections. Awareness of flood risk and its long-term fiscal impact historically has proven insufficient to motivate pre-disaster land use changes and investments in mitigation and protection. While many adaptations and protections fall largely under state and local authority, some stakeholders are interested in federal coastal flood protection projects, including projects by the U.S. Army Corps of Engineers. Since the 1950s, Congress has authorized the Corps to construct specific coastal projects. The broad vision, strategy, and priorities for the federal role in coastal flood damage reduction projects nonetheless remain ill-defined. This research analyzes (1) the authorization and appropriations trends for Corps coastal storm damage reduction projects, and (2) how Corps feasibility studies account for and address coastal flood hazards. Identified trends include: emergency appropriations for storm-damaged areas outstrip annual investments in coastal flood projects; the rate at which projects are congressionally approved for construction outpaces the rate at which construction is funded; and how coastal protection projects are evaluated in Corps feasibility studies shows variation and change in agency practices. These trends have consequences; they affect public and local expectations when projects begin providing protection benefits, and may influence investments in other adaptation measures. These trends also raise questions for policymakers at all levels and for scientists and practitioners interested in coastal flood resilience.

  1. Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks

    Directory of Open Access Journals (Sweden)

    Foroogh Ghasemi

    2018-05-01

    Full Text Available An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and the achievement of those objectives. Moreover, project interdependencies and cause–effect relationships between risks create complexity for portfolio risk analysis. This paper presents a model using Bayesian network (BN methodology for modeling and analyzing portfolio risks. To develop this model, first, portfolio-level risks and risks caused by project interdependencies are identified. Then, based on their cause–effect relationships all portfolio risks are organized in a BN. Conditional probability distributions for this network are specified and the Bayesian networks method is used to estimate the probability of portfolio risk. This model was applied to a portfolio of a construction company located in Iran and proved effective in analyzing portfolio risk probability. Furthermore, the model provided valuable information for selecting a portfolio’s projects and making strategic decisions.

  2. General risks for tunnelling projects: An overview

    Science.gov (United States)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  3. Adaptation of an HIV behavioural disinhibition risk reduction ...

    African Journals Online (AJOL)

    Adaptation of an HIV behavioural disinhibition risk reduction intervention for ... disinhibition risk reduction interventions for recently circumcised men for use in clinic ... medicine HIV prevention technologies into the male circumcision contexts.

  4. Disaster risk reduction and sustainable development

    International Nuclear Information System (INIS)

    Khurshedi, N.

    2005-01-01

    During the past four decades, natural hazards such as earthquakes, volcanic activity, and slides, tsunami tropical cyclones and other severe storms, tornadoes and high winds, river floods and coastal flooding, wildfire and associated haze drought, sand/dust storms, and insect infestations have caused major loss of human lives and livelihoods, the destruction of economic and social infrastructure, as well as environmental damages. Economic losses have increased almost ten times during this period. As it happen in recent Asia Tsunami, in which over 2, 00,000 people reportedly killed, estimated five million homeless, and resulted in massive displacement of population and extensive damage to infrastructure. The escalation of severe disaster events triggered by natural hazards and related technological and environment disasters is increasingly threatening both sustainable development and poverty-reduction initiatives. The loss of human lives and the rise in the cost of reconstruction efforts and loss of development assets has forced the issue of disaster reduction and risk management higher on the policy agenda of affected governments as well a multilateral and bilateral agencies and NGOs. For this Disaster risk reduction-.strategies are aimed at enabling societies at risk to become engaged in the conscious management of risk and the reduction of vulnerability. The adoption of appropriate development policies can reduce disaster risk. These policies should be gender sensitive and need the necessary political commitment. They involve the adoption of suitable regulatory and other legal measures, institutional reform, improved analytical and methodological capabilities, financial planning, education and awareness. (author)

  5. Space-time least-squares Petrov-Galerkin projection in nonlinear model reduction.

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Youngsoo [Sandia National Laboratories (SNL-CA), Livermore, CA (United States). Extreme-scale Data Science and Analytics Dept.; Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Carlberg, Kevin Thomas [Sandia National Laboratories (SNL-CA), Livermore, CA (United States). Extreme-scale Data Science and Analytics Dept.

    2017-09-01

    Our work proposes a space-time least-squares Petrov-Galerkin (ST-LSPG) projection method for model reduction of nonlinear dynamical systems. In contrast to typical nonlinear model-reduction methods that first apply Petrov-Galerkin projection in the spatial dimension and subsequently apply time integration to numerically resolve the resulting low-dimensional dynamical system, the proposed method applies projection in space and time simultaneously. To accomplish this, the method first introduces a low-dimensional space-time trial subspace, which can be obtained by computing tensor decompositions of state-snapshot data. The method then computes discrete-optimal approximations in this space-time trial subspace by minimizing the residual arising after time discretization over all space and time in a weighted ℓ2-norm. This norm can be de ned to enable complexity reduction (i.e., hyper-reduction) in time, which leads to space-time collocation and space-time GNAT variants of the ST-LSPG method. Advantages of the approach relative to typical spatial-projection-based nonlinear model reduction methods such as Galerkin projection and least-squares Petrov-Galerkin projection include: (1) a reduction of both the spatial and temporal dimensions of the dynamical system, (2) the removal of spurious temporal modes (e.g., unstable growth) from the state space, and (3) error bounds that exhibit slower growth in time. Numerical examples performed on model problems in fluid dynamics demonstrate the ability of the method to generate orders-of-magnitude computational savings relative to spatial-projection-based reduced-order models without sacrificing accuracy.

  6. Does mitigation save? Reviewing cost-benefit analyses of disaster risk reduction

    OpenAIRE

    Shreve, Cheney M.; Kelman, Ilan

    2014-01-01

    The benefit-cost-ratio (BCR), used in cost-benefit analysis (CBA), is an indicator that attempts to summarize the overall value for money of a project. Disaster costs continue to rise and the demand has increased to demonstrate the economic benefit of disaster risk reduction (DRR) to policy makers. This study compiles and compares original CBA case studies reporting DRR BCRs, without restrictions as to hazard type, location, scale, or other parameters. Many results were identified supporting ...

  7. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  8. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  9. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  10. Optimal Risk Reduction in the Railway Industry by Using Dynamic Programming

    OpenAIRE

    Michael Todinov; Eberechi Weli

    2013-01-01

    The paper suggests for the first time the use of dynamic programming techniques for optimal risk reduction in the railway industry. It is shown that by using the concept ‘amount of removed risk by a risk reduction option’, the problem related to optimal allocation of a fixed budget to achieve a maximum risk reduction in the railway industry can be reduced to an optimisation problem from dynamic programming. For n risk reduction options and size of the available risk reduction budget B (expres...

  11. Risk assessment and management in IOR projects

    International Nuclear Information System (INIS)

    Goodyear, S.G.; Gregory, A.T.

    1994-01-01

    The application of IOR techniques is one of the investment opportunities open to Exploration and Production companies. A project will only go forward if the perceived balance between the rewards and the risks is acceptable. IOR projects may be ruled out because they are considered to involve significantly higher risks than conventional developments. Therefore, some means of evaluating the actual level of risk may be required if the full economic benefits from IOR techniques are to be realized. Risk assessment is a key element in safety cases, where a well-established methodology for quantifying risk exists. This paper discusses the extension of these methods to IOR project risk assessment. Combining reservoir and IOR technique uncertainties with their impact on project performance allows project risk to be better quantified. The results of the risk assessment are presented in terms of a risk-reward diagram that plots the probability surface for possible project outcomes as a function of NPV (reward) and exposure (risk)

  12. Understanding Pre-Quantitative Risk in Projects

    Science.gov (United States)

    Cooper, Lynne P.

    2011-01-01

    Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

  13. Baseline risk and marginal willingness to pay for health risk reduction.

    Science.gov (United States)

    Gerking, Shelby; Adamowicz, Wiktor; Dickie, Mark; Veronesi, Marcella

    2017-01-01

    Empirical results presented in this paper suggest that parents' marginal willingness to pay (MWTP) for a reduction in morbidity risk from heart disease is inversely related to baseline risk (i.e., the amount of risk initially faced) both for themselves and for their children. For instance, a 40% reduction from the mean of baseline risk results in an increase in MWTP by 70% or more. Thus, estimates of monetary benefits of public programs to reduce heart disease risk would be understated if the standard practice is followed of evaluating MWTP at initial risk levels and then multiplying this value by the number of cases avoided. Estimates are supported by: (1) unique quantitative information on perceptions of the risk of getting heart disease that allow baseline risk to be defined at an individual level and (2) improved econometric procedures to control for well-known difficulties associated with stated preference data.

  14. RISK REDUCTION WITH A FUZZY EXPERT EXPLORATION TOOL

    Energy Technology Data Exchange (ETDEWEB)

    Robert S. Balch; Ron Broadhead

    2005-03-01

    Incomplete or sparse data such as geologic or formation characteristics introduce a high level of risk for oil exploration and development projects. ''Expert'' systems developed and used in several disciplines and industries have demonstrated beneficial results when working with sparse data. State-of-the-art expert exploration tools, relying on a database, and computer maps generated by neural networks and user inputs, have been developed through the use of ''fuzzy'' logic, a mathematical treatment of imprecise or non-explicit parameters and values. Oil prospecting risk has been reduced with the use of these properly verified and validated ''Fuzzy Expert Exploration (FEE) Tools.'' Through the course of this project, FEE Tools and supporting software were developed for two producing formations in southeast New Mexico. Tools of this type can be beneficial in many regions of the U.S. by enabling risk reduction in oil and gas prospecting as well as decreased prospecting and development costs. In today's oil industry environment, many smaller exploration companies lack the resources of a pool of expert exploration personnel. Downsizing, volatile oil prices, and scarcity of domestic exploration funds have also affected larger companies, and will, with time, affect the end users of oil industry products in the U.S. as reserves are depleted. The FEE Tools benefit a diverse group in the U.S., allowing a more efficient use of scarce funds, and potentially reducing dependence on foreign oil and providing lower product prices for consumers.

  15. Reduction of risk level as one of the main challenges of development in covered karst regions

    Directory of Open Access Journals (Sweden)

    Makhnatov Stanislav A.

    2013-01-01

    Full Text Available The paper describes the experience of application of the residual karst risk concept, and presents coefficients of karst risk level reduction for planning constructional karst-protection. Practical experience of design for karstified territories of Nizhny Novgorod region demonstrates that special research of the interaction between constructions and foundations is required. Numerous accidents can serve vivid examples proving the need. I2n this situation it is important to approach the issue of safety in a proper way, taking into account probable economic, environmental and social damage. The problem can be solved by introduction of the karst risk level parameter, which permits to take into consideration constructional characteristics of objects (design philosophy, service life, as well as conditions and mechanisms of interaction between the foundation and the construction (sinkholes, local subsidence, karst-suffosion deformations, etc.. The importance of risk reduction is highlighted by current Russian Federal laws. Depending on karst risk level adequate karst-protection should be performed. For building projects, reduction of karst risk to a permissible level (conventionally equal to 1 is one of the most important research challenges of the karstified territories development, and its solution permits to plan appropriate karst protection measures.

  16. Integrating community based disaster risk reduction and climate change adaptation: examples from the Pacific

    Directory of Open Access Journals (Sweden)

    A. Gero

    2011-01-01

    Full Text Available It is acknowledged by academics and development practitioners alike that many common strategies addressing community based disaster risk reduction and climate change adaptation duplicate each other. Thus, there is a strong push to integrate the two fields to enhance aid effectiveness and reduce confusion for communities. Examples of community based disaster risk reduction (DRR and climate change adaptation (CCA projects are presented to highlight some of the ways these issues are tackled in the Pacific. Various approaches are employed but all aim to reduce the vulnerability and enhance the resilience of local communities to the impacts of climate change and disasters. By focusing on three case studies, elements of best practice are drawn out to illustrate how DRR and CCA can be integrated for enhanced aid effectiveness, and also look at ways in which these two often overlapping fields can be better coordinated in ongoing and future projects. Projects that address vulnerability holistically, and target the overall needs and capacity of the community are found to be effective in enhancing the resilience of communities. By strategically developing a multi-stakeholder and multi-sector approach, community projects are likely to encapsulate a range of experience and skills that will benefit the community. Furthermore, by incorporating local knowledge, communities are far more likely to be engaged and actively participate in the project. From selected case studies, commonly occurring best practice methods to integrate DRR and CCA are identified and discussed and recommendations on how to overcome the common challenges also presented.

  17. Beyond the Sendai Framework for Disaster Risk Reduction: Vulnerability Reduction as a Challenge Involving Historical and Traditional Buildings

    Directory of Open Access Journals (Sweden)

    Valentina Pica

    2018-03-01

    Full Text Available In observance of the international procedures on disaster risk management, and in particular the Sendai Framework (2015, this research focuses on how more specific procedures related to it can be made effective in the treatment of historic areas worldwide. Disaster risk management is now viewed as being important in the context of historic buildings, as they are strongly related to cultural identity as well as to resilient communities, and can have a large impact on local economies. The study points out that cultural heritage might be the core field of action for capacity building in less vulnerable places, and that its protection is one of the main tasks to attend to in order to achieve the goal of vulnerability reduction. The paper also aims to answer questions such as: which actions could allow better protection of cultural heritage? Is it correct to involve local communities in reconstruction plans by capacity building and self-managed projects? How have reconstruction plans been managed recently worldwide? By further developing the applicability of the priority areas of action of the Sendai Framework, the research illustrates critical points and best practices that will hopefully support disaster risk reduction based on strategic management and remote monitoring, involving technologies and social participation.

  18. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  19. Large Scale Reduction of Graphite Oxide Project

    Science.gov (United States)

    Calle, Carlos; Mackey, Paul; Falker, John; Zeitlin, Nancy

    2015-01-01

    This project seeks to develop an optical method to reduce graphite oxide into graphene efficiently and in larger formats than currently available. Current reduction methods are expensive, time-consuming or restricted to small, limited formats. Graphene has potential uses in ultracapacitors, energy storage, solar cells, flexible and light-weight circuits, touch screens, and chemical sensors. In addition, graphite oxide is a sustainable material that can be produced from any form of carbon, making this method environmentally friendly and adaptable for in-situ reduction.

  20. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  1. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  2. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  3. Risk reduction by filtered venting in PWR large dry-containments

    International Nuclear Information System (INIS)

    Gazzillo, F.; Kastenberg, W.E.

    1984-01-01

    The potential risk reduction associated with a Filtered-Vented Containment System is evaluated. A low-volume venting strategy has been considered and data referring to the Zion power plant, along with the results of the Zion Probabilistic Safety Study, have been used. An estimate of the reduction factor is first made for a single core melt accident sequence whose containment failure mode is late overpressure. The result, interpreted as a reduction factor applicable to the release category associated with containment late overpressure is then used for the estimation of the overall risk reduction factor. In particular, the case of internal and external risk for the Zion power plant are considered. Because the contribution from seismic events dominates the overall risk, the importance of different assumptions for seismic fragility is also assessed. Finally an uncertainty analysis of the risk reduction factor for a single accident sequence is performed. An estimate is also obtained on the level of confidence with which certain required values of risk reduction can be achieved. (orig.)

  4. Disaster risk reduction in developing countries: costs, benefits and institutions.

    Science.gov (United States)

    Kenny, Charles

    2012-10-01

    Some 60,000 people worldwide die annually in natural disasters, mostly due to the collapse of buildings in earthquakes, and primarily in the developing world. This is despite the fact that engineering solutions exist that can eliminate almost completely the risk of such deaths. Why is this? The solutions are expensive and technically demanding, so their cost-benefit ratio often is unfavourable as compared to other interventions. Nonetheless, there are various public disaster risk reduction interventions that are highly cost-effective. That such interventions frequently remain unimplemented or ineffectively executed points to a role for issues of political economy. Building regulations in developing countries appear to have limited impact in many cases, perhaps because of inadequate capacity and corruption. Public construction often is of low quality, perhaps for similar reasons. This suggests the need for approaches that emphasise simple and limited disaster risk regulation covering only the most at-risk structures-and that, preferably, non-experts can monitor-as well as numerous transparency and oversight mechanisms for public construction projects. © 2012 The Author(s). Journal compilation © Overseas Development Institute, 2012.

  5. The VeTOOLS Project: an example of how to strengthen collaboration between scientists and Civil Protections in disaster risk reduction

    Science.gov (United States)

    Marti, Joan; Bartolini, Stefania; Becerril, Laura

    2016-04-01

    VeTOOLS is a project funded by the European Commission's Humanitarian Aid and Civil Protection department (ECHO), and aims at creating an integrated software platform specially designed to assess and manage volcanic risk. The project facilitates interaction and cooperation between scientists and Civil Protection Agencies in order to share, unify, and exchange procedures, methodologies and technologies to effectively reduce the impacts of volcanic disasters. The project aims at 1) improving and developing volcanic risk assessment and management capacities in active volcanic regions; 2) developing universal methodologies, scenario definitions, response strategies and alert protocols to cope with the full range of volcanic threats; 4) improving quantitative methods and tools for vulnerability and risk assessment; and 5) defining thresholds and protocols for civil protection. With these objectives, the VeTOOLS project points to two of the Sendai Framework resolutions for implementing it: i) Provide guidance on methodologies and standards for risk assessments, disaster risk modelling and the use of data; ii) Promote and support the availability and application of science and technology to decision-making, and offers a good example on how a close collaboration between science and civil protection is an effective way to contribute to DRR. European Commission ECHO Grant SI2.695524

  6. Projecting community changes in hazard exposure to support long-term risk reduction: A case study of tsunami hazards in the U.S. Pacific Northwest

    Science.gov (United States)

    Sleeter, Benjamin M.; Wood, Nathan J.; Soulard, Christopher E.; Wilson, Tamara

    2017-01-01

    Tsunamis have the potential to cause considerable damage to communities along the U.S. Pacific Northwest coastline. As coastal communities expand over time, the potential societal impact of tsunami inundation changes. To understand how community exposure to tsunami hazards may change in coming decades, we projected future development (i.e. urban, residential, and rural), households, and residents over a 50-year period (2011–2061) along the Washington, Oregon, and northern California coasts. We created a spatially explicit, land use/land cover, state-and-transition simulation model to project future developed land use based on historical development trends. We then compared our development projection results to tsunami-hazard zones associated with a Cascadia subduction zone (CSZ) earthquake. Changes in tsunami-hazard exposure by 2061 were estimated for 50 incorporated cities, 7 tribal reservations, and 17 counties relative to current (2011) estimates. Across the region, 2061 population exposure in tsunami-hazard zones was projected to increase by 3880 households and 6940 residents. The top ten communities with highest population exposure to CSZ-related tsunamis in 2011 are projected to remain the areas with the highest population exposure by 2061. The largest net population increases in tsunami-hazard zones were projected in the unincorporated portions of several counties, including Skagit, Coos, and Humboldt. Land-change simulation modeling of projected future development serves as an exploratory tool aimed at helping local governments understand the hazard-exposure implications of community growth and to include this knowledge in risk-reduction planning.

  7. REDUCTION OF THE RISK IN PUBLIC PROCUREMENT BY USING DESIGN-BUILD AS A MEANS FOR SUITABLE CONSTRUCTING

    Directory of Open Access Journals (Sweden)

    Jakub Blaťák

    2016-07-01

    Full Text Available Suitable and sustainable buildings have increased demands for design and for the transfer of design requirements to realization. That causes an increase of risk connected with the differences between planned and real parameters of the buildings. This article will outline the main theme comparison between DBB and DB projects concerning contractor’s risk management level. This comparative analysis explains, using the RIPRAN method, the hidden risks in each type of delivery method. The comparison identifies numerous contractual topics and risks included in both and gives deeper insight into risk management, both for the contracting party and also for public procurement. Applying risk analysis strategies and tools to the process will help decision-makers evaluate and select the suitable delivery method consistently and defensibly. This paper gives generic risk factors related to both project types. The results indicate risk factors with influence on the price, probability of occurrence and unfavourable impact on the project and help allocate risk level more properly in accordance with its high, middle or low probable impact. Public investment is a significant part of the public budget, the application of design-build can help with the reduction of corruption, and the public sector can benefit from the usage of DB projects to help eliminate the mistakes made by contracting authorities.

  8. Levelized cost-risk reduction prioritization of waste disposal options

    International Nuclear Information System (INIS)

    Wilkinson, V.K.; Young, J.M.

    1992-01-01

    The prioritization of solid waste disposal options in terms of reduced risk to workers, the public, and the environment has recently generated considerable governmental and public interest. In this paper we address the development of a methodology to establish priorities for waste disposal options, such as incineration, landfills, long-term storage, waste minimization, etc. The study is one result of an overall project to develop methodologies for Probabilistic Risk Assessments (PRAs) of non-reactor nuclear facilities for the US Department of Energy. Option preferences are based on a levelized cost-risk reduction analysis. Option rankings are developed as functions of disposal option cost and timing, relative long- and short-term risks, and possible accident scenarios. We examine the annual costs and risks for each option over a large number of years. Risk, in this paper, is defined in terms of annual fatalities (both prompt and long-term) and environmental restoration costs that might result from either an accidental release or long-term exposure to both plant workers and the public near the site or facility. We use event timing to weigh both costs and risks; near-term costs and risks are discounted less than future expenditures and fatalities. This technique levels the timing of cash flows and benefits by converting future costs and benefits to present value costs and benefits. We give an example Levelized Cost-Benefit Analysis of incinerator location options to demonstrate the methodology and required data

  9. POLLUTION PREVENTION RESEARCH ONGOING - EPA'S RISK REDUCTION ENGINEERING LABORATORY

    Science.gov (United States)

    The mission of the Risk Reduction Engineering Laboratory is to advance the understanding, development and application of engineering solutions for the prevention or reduction of risks from environmental contamination. This mission is accomplished through basic and applied researc...

  10. Communication about melanoma and risk reduction after melanoma diagnosis.

    Science.gov (United States)

    Rodríguez, Vivian M; Berwick, Marianne; Hay, Jennifer L

    2017-12-01

    Melanoma patients are advised to perform regular risk-reduction practices, including sun protection as well as skin self-examinations (SSEs) and physician-led examinations. Melanoma-specific communication regarding family risk and screening may promote such behaviors. To this end, associations between patients' melanoma-specific communication and risk reduction were examined. Melanoma patients (N = 169) drawn from a population-based cancer registry reported their current risk-reduction practices, perceived risk of future melanoma, and communication with physicians and relatives about melanoma risk and screening. Patients were, on average, 56 years old and 6.7 years' post diagnosis; 51% were male, 93% reported "fair/very fair" skin color, 75% completed at least some college, and 22% reported a family history of melanoma. Patients reported varying levels of regular (always/nearly always) sun protection: sunscreen use (79%), shade seeking (60%), hat use (54%), and long-sleeve shirt use (30%). Only 28% performed thorough SSE regularly, whereas 92% reported undergoing physician-led skin examinations within the past year. Participants who were female, younger, and had a higher perceived risk of future melanoma were more likely to report past communication. In adjusted analyses, communication remained uniquely associated with increased sunscreen use and SSE. Encouraging melanoma patients to have a more active role in discussions concerning melanoma risk and screening with relatives and physicians alike may be a useful strategy to promote 2 key risk-reduction practices post melanoma diagnosis and treatment. Future research is needed to identify additional strategies to improve comprehensive risk reduction in long-term melanoma patients. Copyright © 2016 John Wiley & Sons, Ltd.

  11. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project

    NARCIS (Netherlands)

    van Os, A.; van Berkel, F.J.F.W.; de Gilder, T.C.; van Dyck, C.; Groenewegen, P.

    2015-01-01

    This paper explores the role of social identity threat in risk discourse in an infrastructure project, and the consequences risk discourse has for cooperation between stakeholders. We show that risks posed a threat to the identity of the project team, resulting in a discourse focused on attributing

  12. Integrated risk reduction framework to improve railway hazardous materials transportation safety

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xiang, E-mail: liu94@illinois.edu; Saat, M. Rapik, E-mail: mohdsaat@illinois.edu; Barkan, Christopher P.L., E-mail: cbarkan@illinois.edu

    2013-09-15

    Highlights: • An integrated framework is developed to optimize risk reduction. • A negative binomial regression model is developed to analyze accident-cause-specific railcar derailment probability. • A Pareto-optimality technique is applied to determine the lowest risk given any level of resource. • A multi-attribute decision model is developed to determine the optimal amount of investment for risk reduction. • The models could aid the government and rail industry in developing cost-efficient risk reduction policy and practice. -- Abstract: Rail transportation plays a critical role to safely and efficiently transport hazardous materials. A number of strategies have been implemented or are being developed to reduce the risk of hazardous materials release from train accidents. Each of these risk reduction strategies has its safety benefit and corresponding implementation cost. However, the cost effectiveness of the integration of different risk reduction strategies is not well understood. Meanwhile, there has been growing interest in the U.S. rail industry and government to best allocate resources for improving hazardous materials transportation safety. This paper presents an optimization model that considers the combination of two types of risk reduction strategies, broken rail prevention and tank car safety design enhancement. A Pareto-optimality technique is used to maximize risk reduction at a given level of investment. The framework presented in this paper can be adapted to address a broader set of risk reduction strategies and is intended to assist decision makers for local, regional and system-wide risk management of rail hazardous materials transportation.

  13. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  14. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  15. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  16. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  17. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  18. Relationships among Trust in Messages, Risk Perception, and Risk Reduction Preferences Based upon Avian Influenza in Taiwan

    Science.gov (United States)

    Fang, David; Fang, Chen-Ling; Tsai, Bi-Kun; Lan, Li-Chi; Hsu, Wen-Shan

    2012-01-01

    Improvements in communications technology enable consumers to receive information through diverse channels. In the case of avian influenza, information repeated by the mass media socially amplifies the consumer awareness of risks. Facing indeterminate risks, consumers may feel anxious and increase their risk perception. When consumers trust the information published by the media, their uncertainty toward avian influenza may decrease. Consumers might take some actions to reduce risk. Therefore, this study focuses on relationships among trust in messages, risk perception and risk reduction preferences. This study administered 525 random samples and consumer survey questionnaires in different city of Taiwan in 2007. Through statistical analysis, the results demonstrate: (1) the higher the trust consumers have in messages about avian influenza, the lower their risk perceptions are; (2) the higher the consumers’ risk perceptions are and, therefore, the higher their desired level of risk reductive, the more likely they are to accept risk reduction strategies; (3) consumer attributes such as age, education level, and marital status correlate with significant differences in risk perception and risk reduction preferences acceptance. Gender has significant differences only in risk reduction preferences and not in risk perception. PMID:23066394

  19. Relationships among Trust in Messages, Risk Perception, and Risk Reduction Preferences Based upon Avian Influenza in Taiwan

    Directory of Open Access Journals (Sweden)

    Wen-Shan Hsu

    2012-08-01

    Full Text Available Improvements in communications technology enable consumers to receive information through diverse channels. In the case of avian influenza, information repeated by the mass media socially amplifies the consumer awareness of risks. Facing indeterminate risks, consumers may feel anxious and increase their risk perception. When consumers trust the information published by the media, their uncertainty toward avian influenza may decrease. Consumers might take some actions to reduce risk. Therefore, this study focuses on relationships among trust in messages, risk perception and risk reduction preferences. This study administered 525 random samples and consumer survey questionnaires in different city of Taiwan in 2007. Through statistical analysis, the results demonstrate: (1 the higher the trust consumers have in messages about avian influenza, the lower their risk perceptions are; (2 the higher the consumers’ risk perceptions are and, therefore, the higher their desired level of risk reductive, the more likely they are to accept risk reduction strategies; (3 consumer attributes such as age, education level, and marital status correlate with significant differences in risk perception and risk reduction preferences acceptance. Gender has significant differences only in risk reduction preferences and not in risk perception.

  20. Study on Risk Approaches in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  1. Risks and chances of combined forestry and biomass projects under the Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Dutschke, Michael; Kapp, Gerald; Lehmann, Anna; Schaefer, Volkmar (Hamburg Inst. International Economics (Germany))

    2006-06-15

    The Clean Development Mechanism (CDM) aims at reducing greenhouse gas (GHG) emissions, while at the same time taking up CO{sub 2} from the atmosphere in vegetation by means of afforestation and reforestation. In spite of these options being complementary, rules and modalities for both project classes are being treated separately in the relevant decisions by the Conference of the Parties to the UN Framework Convention on Climate Change. The present study reviews the state of bioenergy use in developing countries, modalities and procedures under the CDM, and the potential for transaction cost reduction in climate mitigation projects. There are four potential types of combinations in the matrix between small-scale - large-scale / afforestation and reforestation - bioenergy activities. We develop criteria for assessing sustainable development benefits and present an example project for each of the potential project types. We find that the individual risks of single-category projects do not increase when combining project categories and that each combination holds potential for integrated sustainability benefits. Risks for local livelihoods do increase with project size, but a transparent, participatory planning phase is able to counterbalance smallholders' lack of negotiation power. Further research will have to develop concrete project examples and blueprints with approved CDM methodologies, thereby decreasing transaction costs and risk for all potential project partners. (au)

  2. Streamlining project delivery through risk analysis.

    Science.gov (United States)

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  3. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  4. Communication products for the Science Application for Risk Reduction (SAFRR) tsunami scenario: Chapter K in The SAFRR (Science Application for Risk Reduction) Tsunami Scenario

    Science.gov (United States)

    Perry, Suzanne C.

    2013-01-01

    Science Application for Risk Reduction (SAFRR), like its predecessor the Multi-Hazards Demonstration Project, has a mission to increase the use of science by decision-makers of all kinds. Thus, an important part of any SAFRR scenario is development of products that enhance usability of the science. In this tsunami scenario, the focus has been on development of three kinds of products: products that augment typical outputs of scientific studies, such as reports, to make the results of the scenario more relevant and usable to nonscientists; products that distill local impacts and allow users in specific locales to identify which aspects of the broad regional study apply to their local area; and

  5. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  6. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, Johannes I.M.; Keizer, J.A.

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  7. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1994-01-01

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  8. Disaster management and risk reduction in South Africa

    CSIR Research Space (South Africa)

    Bruwer, A

    2017-12-01

    Full Text Available The 2015 Global Assessment Report on Disaster Risk Reduction concludes that the mortality and economic loss associated with extensive risks (minor but recurrent disaster risks) in low- and middle-income countries are trending up. In the last decade...

  9. Default risk in project finance

    NARCIS (Netherlands)

    Klompjan, R.; Wouters, Marc

    2002-01-01

    Understanding default risk in project finance is relevant to investors. This article investigates which factors are most strongly associated with the occurrence of project finance default, using data from 210 projects, of which 37 were in default. The authors found that the use of proven technology,

  10. Consideration of Risk in PPP-Projects

    Directory of Open Access Journals (Sweden)

    Josef Zimmermann

    2014-06-01

    Full Text Available Risk management has become a core competence for companies operating in construction services. In particular regarding Real Estate Development and Construction Management the fundamental knowledge and the dedicated ap- plication of risk assessment turn out to be critical. Construction Management deals with a multitude of local and temporal issues which are unknown or only given by statistical evaluation while conducting a unique construction project within a very tight frame of budget and time. Real Estate projects focus on the predictability of profitable operation for a fairly long period in advance and are therefore subject to many more and more voluminous uncertainties. With PPP-projects a more or less complete federal task is awarded to a private company. Its extent varies but com- prises at least design, construction and operation of a real estate project, e.g. a toll road, bridge, tunnel or other infrastructural object. Durations of such contracts of- ten extend to some 20 to 30 years. In this article the applicability of traditional means of risk management is inves- tigated for the use on PPP-projects and limits of risk consequences are pointed out. Finally we come to the conclusion, that the resulting unavertable risks tend to exceed every surcharge that could be successfully placed on a market.

  11. Integrated risk reduction framework to improve railway hazardous materials transportation safety.

    Science.gov (United States)

    Liu, Xiang; Saat, M Rapik; Barkan, Christopher P L

    2013-09-15

    Rail transportation plays a critical role to safely and efficiently transport hazardous materials. A number of strategies have been implemented or are being developed to reduce the risk of hazardous materials release from train accidents. Each of these risk reduction strategies has its safety benefit and corresponding implementation cost. However, the cost effectiveness of the integration of different risk reduction strategies is not well understood. Meanwhile, there has been growing interest in the U.S. rail industry and government to best allocate resources for improving hazardous materials transportation safety. This paper presents an optimization model that considers the combination of two types of risk reduction strategies, broken rail prevention and tank car safety design enhancement. A Pareto-optimality technique is used to maximize risk reduction at a given level of investment. The framework presented in this paper can be adapted to address a broader set of risk reduction strategies and is intended to assist decision makers for local, regional and system-wide risk management of rail hazardous materials transportation. Copyright © 2013 Elsevier B.V. All rights reserved.

  12. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  13. The efficacy of serostatus disclosure for HIV Transmission risk reduction.

    Science.gov (United States)

    O'Connell, Ann A; Reed, Sandra J; Serovich, Julianne A

    2015-02-01

    Interventions to assist HIV+ persons in disclosing their serostatus to sexual partners can play an important role in curbing rates of HIV transmission among men who have sex with men (MSM). Based on the methods of Pinkerton and Galletly (AIDS Behav 11:698-705, 2007), we develop a mathematical probability model for evaluating effectiveness of serostatus disclosure in reducing the risk of HIV transmission and extend the model to examine the impact of serosorting. In baseline data from 164 HIV+ MSM participating in a randomized controlled trial of a disclosure intervention, disclosure is associated with a 45.0 % reduction in the risk of HIV transmission. Accounting for serosorting, a 61.2 % reduction in risk due to disclosure was observed in serodisconcordant couples. The reduction in risk for seroconcordant couples was 38.4 %. Evidence provided supports the value of serostatus disclosure as a risk reduction strategy in HIV+ MSM. Interventions to increase serostatus disclosure and that address serosorting behaviors are needed.

  14. Waiting for Disasters: A Risk Reduction Assessment of Technological Disasters

    Science.gov (United States)

    Rovins, Jane; Winningham, Sam

    2010-05-01

    This session provides a risk reduction/mitigation assessment of natural hazards causation of technological disasters and possible solution. People use technology in an attempt to not only control their environment but nature itself in order to make them feel safe and productive. Most strategies for managing hazards followed a traditional planning model i.e. study the problem, identify and implement a solution, and move on to the next problem. This approach is often viewed as static model and risk reduction is more of an upward, positive, linear trend. However, technological disasters do not allow risk reduction action to neatly fit this upward, positive, linear trend with actual or potential threats to the environment and society. There are different types of technological disasters, including industrial accidents; pipeline ruptures; accidents at power, water and heat supply systems and other lines of communication; sudden collapse of buildings and mines; air crashes; shipwrecks; automobile and railway accidents to name a few. Natural factors can play an essential role in triggering or magnifying technological disasters. They can result from the direct destruction of given technical objects by a hazardous natural process such as the destruction of an atomic power plant or chemical plant due to an earthquake. Other examples would include the destruction of communications or infrastructure systems by heavy snowfalls, strong winds, avalanches. Events in the past ten years clearly demonstrate that natural disasters and the technological disasters that accompany them are not problems that can be solved in isolation and risk reduction can play an important part. Risk reduction was designed to head off the continuing rising financial and structural tolls from disasters. All Hazard Risk Reduction planning was supposed to include not only natural, but technological, and human-made disasters as well. The subsequent disaster risk reduction (DRR) indicators were to provide the

  15. Propulsion Noise Reduction Research in the NASA Advanced Air Transport Technology Project

    Science.gov (United States)

    Van Zante, Dale; Nark, Douglas; Fernandez, Hamilton

    2017-01-01

    The Aircraft Noise Reduction (ANR) sub-project is focused on the generation, development, and testing of component noise reduction technologies progressing toward the NASA far term noise goals while providing associated near and mid-term benefits. The ANR sub-project has efforts in airframe noise reduction, propulsion (including fan and core) noise reduction, acoustic liner technology, and propulsion airframe aeroacoustics for candidate conventional and unconventional aircraft configurations. The current suite of propulsion specific noise research areas is reviewed along with emerging facility and measurement capabilities. In the longer term, the changes in engine and aircraft configuration will influence the suite of technologies necessary to reduce noise in next generation systems.

  16. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  17. Risk managements' communicative effects influencing IT project success

    NARCIS (Netherlands)

    de Bakker, Karel; Boonstra, Albert; Wortmann, Hans

    The central question of this research is if, and how, risk management contributes to the success of IS/IT projects. Risk management is used regularly in IT projects, despite indications in literature that risk management only occasionally contributes to IT project success. Drawing on Habermas we

  18. Ecosystem Approach To Flood Disaster Risk Reduction

    Directory of Open Access Journals (Sweden)

    RK Kamble

    2013-12-01

    Full Text Available India is one of the ten worst disaster prone countries of the world. The country is prone to disasters due to number of factors; both natural and anthropogenic, including adverse geo-climatic conditions, topographical features, environmental degradation, population growth, urbanisation, industrlisation, non-scientific development practices etc. The factors either in original or by accelerating the intensity and frequency of disasters are responsible for heavy toll of human lives and disrupting the life support systems in the country. India has 40 million hectares of the flood-prone area, on an average, flood affect an area of around 7.5 million hectares per year. Knowledge of environmental systems and processes are key factors in the management of disasters, particularly the hydro-metrological ones. Management of flood risk and disaster is a multi-dimensional affair that calls for interdisciplinary approach. Ecosystem based disaster risk reduction builds on ecosystem management principles, strategies and tools in order to maximise ecosystem services for risk reduction. This perspective takes into account the integration of social and ecological systems, placing people at the centre of decision making. The present paper has been attempted to demonstrate how ecosystem-based approach can help in flood disaster risk reduction. International Journal of Environment, Volume-2, Issue-1, Sep-Nov 2013, Pages 70-82 DOI: http://dx.doi.org/10.3126/ije.v2i1.9209

  19. Dealing with project complexity by matrix-based propagation modelling for project risk analysis

    OpenAIRE

    Fang , Chao; Marle , Franck

    2012-01-01

    International audience; Engineering projects are facing a growing complexity and are thus exposed to numerous and interdependent risks. In this paper, we present a quantitative method for modelling propagation behaviour in the project risk network. The construction of the network requires the involvement of the project manager and related experts using the Design Structure Matrix (DSM) method. A matrix-based risk propagation model is introduced to calculate risk propagation and thus to re-eva...

  20. NHS health checks through general practice: randomised trial of population cardiovascular risk reduction

    Directory of Open Access Journals (Sweden)

    Cochrane Thomas

    2012-11-01

    Full Text Available Abstract Background The global burden of the major vascular diseases is projected to rise and to remain the dominant non-communicable disease cluster well into the twenty first century. The Department of Health in England has developed the NHS Health Check service as a policy initiative to reduce population vascular disease risk. The aims of this study were to monitor population changes in cardiovascular disease (CVD risk factors over the first year of the new service and to assess the value of tailored lifestyle support, including motivational interview with ongoing support and referral to other services. Methods Randomised trial comparing NHS Health Check service only with NHS Health Check service plus additional lifestyle support in Stoke on Trent, England. Thirty eight general practices and 601 (365 usual care, 236 additional lifestyle support patients were recruited and randomised independently between September 2009 and February 2010. Changes in population CVD risk between baseline and one year follow-up were compared, using intention-to-treat analysis. The primary outcome was the Framingham 10 year CVD risk score. Secondary outcomes included individual modifiable risk measures and prevalence of individual risk categories. Additional lifestyle support included referral to a lifestyle coach and free sessions as needed for: weight management, physical activity, cook and eat and positive thinking. Results Average population CVD risk decreased from 32.9% to 29.4% (p Conclusions The NHS Health Check service in Stoke on Trent resulted in significant reduction in estimated population CVD risk. There was no evidence of further benefit of the additional lifestyle support services in terms of absolute CVD risk reduction.

  1. Historic Landslide Data Combined with Sentinel Satellite Data to Improve Modelling for Disaster Risk Reduction

    Science.gov (United States)

    Bye, B. L.; Kontoes, C.; Catarino, N.; De Lathouwer, B.; Concalves, P.; Meyer-Arnek, J.; Mueller, A.; Kraft, C.; Grosso, N.; Goor, E.; Voidrot, M. F.; Trypitsidis, A.

    2017-12-01

    Landslides are geohazards potentially resulting in disasters. Landslides both vary enormously in their distribution in space and time. The surface deformation varies considerably from one type of instability to another. Individual ground instabilities may have a common trigger (extreme rainfall, earthquake), and therefore occur alongside many equivalent occurrences over a large area. This means that they can have a significant regional impact demanding national and international disaster risk reduction strategies. Regional impacts require collaboration across boarders as reflected in The Sendai Framework for Disaster Risk Reduction (2015-2030). The data demands related to the SDGs are unprecedented, another factor that will require coordinated efforts at the global, regional and national levels. Data of good quality are vital for governments, international organizations, civil society, the private sector and the general public in order to make informed decisions, included for disaster risk reduction. The NextGEOSS project evolves the European vision of a user driven GEOSS data exploitation for innovation and business, relying on 3 main pillars; engaging communities of practice, delivering technological advancements, and advocating the use of GEOSS. These 3 pillars support the creation and deployment of Earth observation based innovative research activities and commercial services. In this presentation we will explain how one of the 10 NextGEOSS pilots, Disaster Risk Reduction (DRR), plan to provide an enhanced multi-hazard risk assessment framework based on statistical analysis of long time series of data. Landslide events monitoring and landslides susceptibility estimation will be emphazised. Workflows will be based on models developed in the context of the Copernicus Emergency Management Service. Data envisaged to be used are: Radar SAR data; Yearly ground deformation/velocities; Historic landslide inventory; data related to topographic, geological, hydrological

  2. Effect of smoking reduction on lung cancer risk

    DEFF Research Database (Denmark)

    Godtfredsen, Nina S; Prescott, Eva; Osler, Merete

    2005-01-01

    Many smokers are unable or unwilling to completely quit smoking. A proposed means of harm reduction is to reduce the number of cigarettes smoked per day. However, it is not clear whether this strategy decreases the risk for tobacco-related diseases.......Many smokers are unable or unwilling to completely quit smoking. A proposed means of harm reduction is to reduce the number of cigarettes smoked per day. However, it is not clear whether this strategy decreases the risk for tobacco-related diseases....

  3. Achieving CO2 Emissions Reduction Goals with Energy Infrastructure Projects

    International Nuclear Information System (INIS)

    Eberlinc, M.; Medved, K.; Simic, J.

    2013-01-01

    The EU has set its short-term goals in the Europe 2020 Strategy (20% of CO 2 emissions reduction, 20% increase in energy efficiency, 20% share of renewables in final energy). The analyses show that the EU Member States in general are on the right track of achieving these goals; they are even ahead (including Slovenia). But setting long-term goals by 2050 is a tougher challenge. Achieving CO 2 emissions reduction goes hand in hand with increasing the share of renewables and strategically planning the projects, which include exploiting the potential of renewable sources of energy (e.g. hydropower). In Slovenia, the expected share of hydropower in electricity production from large HPPs in the share of renewables by 2030 is 1/3. The paper includes a presentation of a hydro power plants project on the middle Sava river in Slovenia and its specifics (influenced by the expansion of the Natura 2000 protected sites and on the other hand by the changes in the Environment Protection Law, which implements the EU Industrial Emissions Directive and the ETS Directive). Studies show the importance of the HPPs in terms of CO 2 emissions reduction. The main conclusion of the paper shows the importance of energy infrastructure projects, which contribute to on the one hand the CO 2 emissions reduction and on the other the increase of renewables.(author)

  4. Risk management study for the Hanford Site facilities: Risk reduction cost comparison for the retired Hanford Site facilities

    International Nuclear Information System (INIS)

    Coles, G.A.; Egge, R.G.; Senger, E.; Shultz, M.W.; Taylor, W.E.

    1994-02-01

    This document provides a cost-comparison evaluation for implementing certain risk-reduction measures and their effect on the overall risk of the 100 and 200 Area retired, surplus facilities. The evaluation is based on conditions that existed at the time the risk evaluation team performed facility investigations, and does not acknowledge risk-reduction measures that occurred soon after risk identification. This evaluation is one part of an overall risk management study for these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1450-km 2 Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30 km southeast of the 200 Area. This cost-comparison evaluation (1) determines relative costs for reducing risk to acceptable levels; (2) compares the cost of reducing risk using different risk-reduction options; and (3) compares the cost of reducing risks at different facilities. The result is an identification of the cost effective risk-reduction measures. Supporting information required to develop costs of the various risk-reduction options also is included

  5. Project finance risks - getting it right first time

    International Nuclear Information System (INIS)

    Bain, F.

    1996-01-01

    Bankers seeking to invest in the construction of new power stations by independent power producers, face greater risks than those lending to companies. Independent risk and insurance advisers are used to assess project risk. ''Project finance'' has become increasingly popular as it allows projects to go ahead that could not be supported from sponsors' own resources. In addition, project finance means that various equity partners can join together in a joint venture company and limit their individual risk. Project finance can be delayed by differences between the needs of sponsors, financiers and insurers. The process can be speeded up by foreknowledge of bankers' requirements. (UK)

  6. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  7. Children capacity in disaster risk reduction: A call for action

    Directory of Open Access Journals (Sweden)

    Leila Mohammadinia

    2017-01-01

    Full Text Available Disasters have various physical, psychological, social and economical effects on all age group, particularly children who are more vulnerable than adults. In the aftermath of disasters, children like pregnant women, elderly and handicaps are special group with special needs. This is because they are at greater risk based on their specific physiological and psychological characteristics. Moreover,, according to the Sendai document, children need more attention in Disaster Risk Reduction (DRRprograms design, policies implementation with a proactive approach in Disaster Risk Reduction (1. In the Sendai document it is emphasized that policies regarding disaster risk reduction, cognition and risk perception about the risk property should be considered based upon the hazards and the environment in terms of vulnerability, capacity and exposure (2.Hyogo framework for action was also already have been focused on child priority on the legislation program (3. Accordingly, it is necessary to involve children in disaster risk reduction programs actively in order to overcome their needs and their problems (4. As children are more affected groups in various aspects of disasters in most countries, their potential utilization, the conditions and space should be provided based on laws, national policies, training and capacity. Although after disaster children required particular needs and attention(5-6, they should be considered as an active group who could participate in DRR program and help their family and also the community.(4, 7 Some evidences suggest on value of children team working for community preparedness. Iran had a successful experience for using adolescence capacity as a pillar in activation of early warning; including notification announced while observing the rising sea levels for local community in order to reduce the risk of flood disaster at a local area in the North of Iran. According to the Hyogo and the Sendai documents, it seems that using

  8. Incentivising flood risk adaptation through risk based insurance premiums : Trade-offs between affordability and risk reduction

    NARCIS (Netherlands)

    Hudson, Paul F.; Botzen, W.J.W.; Feyen, L.; Aerts, Jeroen C.J.H.

    2016-01-01

    The financial incentives offered by the risk-based pricing of insurance can stimulate policyholder adaptation to flood risk while potentially conflicting with affordability. We examine the trade-off between risk reduction and affordability in a model of public-private flood insurance in France and

  9. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  10. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  11. Binomial Distribution Sample Confidence Intervals Estimation 7. Absolute Risk Reduction and ARR-like Expressions

    Directory of Open Access Journals (Sweden)

    Andrei ACHIMAŞ CADARIU

    2004-08-01

    Full Text Available Assessments of a controlled clinical trial suppose to interpret some key parameters as the controlled event rate, experimental event date, relative risk, absolute risk reduction, relative risk reduction, number needed to treat when the effect of the treatment are dichotomous variables. Defined as the difference in the event rate between treatment and control groups, the absolute risk reduction is the parameter that allowed computing the number needed to treat. The absolute risk reduction is compute when the experimental treatment reduces the risk for an undesirable outcome/event. In medical literature when the absolute risk reduction is report with its confidence intervals, the method used is the asymptotic one, even if it is well know that may be inadequate. The aim of this paper is to introduce and assess nine methods of computing confidence intervals for absolute risk reduction and absolute risk reduction – like function.Computer implementations of the methods use the PHP language. Methods comparison uses the experimental errors, the standard deviations, and the deviation relative to the imposed significance level for specified sample sizes. Six methods of computing confidence intervals for absolute risk reduction and absolute risk reduction-like functions were assessed using random binomial variables and random sample sizes.The experiments shows that the ADAC, and ADAC1 methods obtains the best overall performance of computing confidence intervals for absolute risk reduction.

  12. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  13. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  14. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  15. Risk avoidance versus risk reduction: a framework and segmentation profile for understanding adolescent sexual activity.

    Science.gov (United States)

    Hopkins, Christopher D; Tanner, John F; Raymond, Mary Anne

    2004-01-01

    The teen birthrate in the United States is twice that of other industrialized nations. Adolescents in the U.S. are among high-risk groups for HIV/AIDS and other sexually transmitted diseases. As a result, the Department of Health and Human Services changed its policy on the promotion of abstinence to teenagers from a focus on a risk reduction strategy to a focus on a risk avoidance strategy. In order to create more effective risk avoidance as well as risk reduction campaigns, this study proposes a framework to illustrate the distinction that teens make between spontaneous sexual activity and planned sexual activity, as well as those teens that make a commitment to abstinence versus abstinence by default. Furthermore, this study classifies teens into three behavior segments (abstemious, promiscuous and monogamous) and then assesses specific differences that exist within these groups relative to their attitudes and perceptions concerning abstinence, sexual activity, contraception, fear and norms. This change in focus from a risk reduction to a risk avoidance strategy has important implications for social marketing, public policy and marketing theory.

  16. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  17. Modelling projections for the risks related with atrial fibrillation in East Asia

    DEFF Research Database (Denmark)

    Bai, Ying; Guo, Shi-Dong; Shantsila, Alena

    2017-01-01

    Aims: In the Far East, there has generally been low uptake of oral anticoagulants (OACs) using vitamin K antagonists (VKA, e.g. warfarin) for stroke prevention in atrial fibrillation (AF), but OAC use has been increasing more recently, with the introduction of the non-vitamin K antagonist oral...... anticoagulants (NOACs). To explore the risks of ischaemic stroke (IS) and death related to AF in East Asia using modelling projections. Methods and results: We performed a modelling analysis of possible trends of IS and death rates in AF patients from the time period of only VKA use to current increasing trends....... There was an estimated annual risk reduction of 5484 ISs and 1128 deaths from 2016 to 2030, respectively. The AF population is estimated to reach 861 900 in 2050, with a reduction of 206 315 ISs and 139 353 deaths. Conclusion: This modelling analysis suggests that the transition from VKA to NOACs may greatly help...

  18. Conflict reduction in cross-functional projects in South African automotive firms

    Directory of Open Access Journals (Sweden)

    T. Mueller

    2008-12-01

    Full Text Available Purpose: The purpose of this article is to explore whether certain organisational control mechanisms can reduce conflict associated with cross-functional projects. Methodology: This is an exploratory study and individuals who had recently engaged in a cross-functional process improvement or change implementation project at automotives firm in South Africa were surveyed. The information collected from the survey was analysed using exploratory factor analysis and correlation analysis. Findings: The results of this study indicate that of the three control mechanisms examined, formalisation in project structure had the strongest association with a reduction in conflict. Reward systems that reward both the team as well as the individual were also found to have a significant association with a reduction in conflict. Use of performance measurement systems aimed at achieving strategic alignment did not have an association with conflict reduction in the organisation. Implications: These findings yield the following implications for management practice. Firstly managers need to be conscious that initiatives such as process improvement projects that require individuals from different functions to work together can often result in conflict. Secondly, this conflict can be reduced by formalizing roles and responsibilities and decreasing ambiguity in the project. Thirdly, design of reward systems that incentivise both the cross-functional team as well as the individual can also help to reduce conflict. Contribution and value: This study has shed light on the role of certain organisational control mechanisms on reducing conflict associated with cross-functional projects. It has also contributed to our understanding of how formalisation in project structure influences conflict in comparison to how performance measurement and reward systems influence conflict.

  19. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  20. Data base on dose reduction research projects for nuclear power plants

    International Nuclear Information System (INIS)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K.

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report

  1. Climate change, uncertainty and investment in flood risk reduction

    NARCIS (Netherlands)

    Pol, van der T.D.

    2015-01-01

    Economic analysis of flood risk management strategies has become more complex due to climate change. This thesis investigates the impact of climate change on investment in flood risk reduction, and applies optimisation methods to support identification of optimal flood risk management strategies.

  2. Results and assessment of participation of VUPEK in coordinated research project of the IAEA ''Comparison of cost-effectiveness of risk reduction among different energy systems''

    International Nuclear Information System (INIS)

    Kadlec, J.; Horacek, P.

    1989-01-01

    The results and conclusions are summarized of the research programme ''Comparison of cost-effectiveness of risk reduction among different energy systems'' co-ordinated in 1983 to 1988 by the International Atomic Energy Agency. Institutes in 18 member states were involved which performed 33 case studies in the field of risk reduction in various power systems or their parts. A comparison with cost-effectiveness of risk reduction in other fields was made as well. The health risks (occupational, those of population) and the environmental risks were evaluated. The case studies cover various stages of the decision-making process and various decision makers. The solution resulted in 5 methodological studies and 16 models. 11 case studies and 1 methodological study were conducted by the Research Institute of the Fuel and Energy Complex. The experiences obtained, the questions so far unanswered and recommendations for those who will perform similar studies are given. (author). 1 fig., 2 tabs., 3 refs

  3. PECULIARITIES OF ASSESSMENT AND RISK MANAGEMENT IN INNOVATIVE PROJECTS

    Directory of Open Access Journals (Sweden)

    Victor V. Guzhov

    2014-01-01

    Full Text Available The methodological and methodicalbases of risk management in innovativeprojects. Classification of risks. Types of risks depending on the stage of realizationof the innovative project. Investigated thefactors contributing to the emergence ofrisk situations. The basic techniques of risk management of innovation projects.Proposed criteria for the choice of the innovative project to implement in the realsector of the economy.

  4. Reflections from the interface between seismological research and earthquake risk reduction

    Science.gov (United States)

    Sargeant, S.

    2012-04-01

    Scientific understanding of earthquakes and their attendant hazards is vital for the development of effective earthquake risk reduction strategies. Within the global disaster reduction policy framework (the Hyogo Framework for Action, overseen by the UN International Strategy for Disaster Reduction), the anticipated role of science and scientists is clear, with respect to risk assessment, loss estimation, space-based observation, early warning and forecasting. The importance of information sharing and cooperation, cross-disciplinary networks and developing technical and institutional capacity for effective disaster management is also highlighted. In practice, the degree to which seismological information is successfully delivered to and applied by individuals, groups or organisations working to manage or reduce the risk from earthquakes is variable. The challenge for scientists is to provide fit-for-purpose information that can be integrated simply into decision-making and risk reduction activities at all levels of governance and at different geographic scales, often by a non-technical audience (i.e. people without any seismological/earthquake engineering training). The interface between seismological research and earthquake risk reduction (defined here in terms of both the relationship between the science and its application, and the scientist and other risk stakeholders) is complex. This complexity is a function of a range issues that arise relating to communication, multidisciplinary working, politics, organisational practices, inter-organisational collaboration, working practices, sectoral cultures, individual and organisational values, worldviews and expectations. These factors can present significant obstacles to scientific information being incorporated into the decision-making process. The purpose of this paper is to present some personal reflections on the nature of the interface between the worlds of seismological research and risk reduction, and the

  5. Network theory-based analysis of risk interactions in large engineering projects

    International Nuclear Information System (INIS)

    Fang, Chao; Marle, Franck; Zio, Enrico; Bocquet, Jean-Claude

    2012-01-01

    This paper presents an approach based on network theory to deal with risk interactions in large engineering projects. Indeed, such projects are exposed to numerous and interdependent risks of various nature, which makes their management more difficult. In this paper, a topological analysis based on network theory is presented, which aims at identifying key elements in the structure of interrelated risks potentially affecting a large engineering project. This analysis serves as a powerful complement to classical project risk analysis. Its originality lies in the application of some network theory indicators to the project risk management field. The construction of the risk network requires the involvement of the project manager and other team members assigned to the risk management process. Its interpretation improves their understanding of risks and their potential interactions. The outcomes of the analysis provide a support for decision-making regarding project risk management. An example of application to a real large engineering project is presented. The conclusion is that some new insights can be found about risks, about their interactions and about the global potential behavior of the project. - Highlights: ► The method addresses the modeling of complexity in project risk analysis. ► Network theory indicators enable other risks than classical criticality analysis to be highlighted. ► This topological analysis improves project manager's understanding of risks and risk interactions. ► This helps project manager to make decisions considering the position in the risk network. ► An application to a real tramway implementation project in a city is provided.

  6. Software for Probabilistic Risk Reduction

    Science.gov (United States)

    Hensley, Scott; Michel, Thierry; Madsen, Soren; Chapin, Elaine; Rodriguez, Ernesto

    2004-01-01

    A computer program implements a methodology, denoted probabilistic risk reduction, that is intended to aid in planning the development of complex software and/or hardware systems. This methodology integrates two complementary prior methodologies: (1) that of probabilistic risk assessment and (2) a risk-based planning methodology, implemented in a prior computer program known as Defect Detection and Prevention (DDP), in which multiple requirements and the beneficial effects of risk-mitigation actions are taken into account. The present methodology and the software are able to accommodate both process knowledge (notably of the efficacy of development practices) and product knowledge (notably of the logical structure of a system, the development of which one seeks to plan). Estimates of the costs and benefits of a planned development can be derived. Functional and non-functional aspects of software can be taken into account, and trades made among them. It becomes possible to optimize the planning process in the sense that it becomes possible to select the best suite of process steps and design choices to maximize the expectation of success while remaining within budget.

  7. Impact of trade in emission reduction credits on solar projects

    International Nuclear Information System (INIS)

    Kulkarni, P.

    1993-01-01

    Since the amendment of the Clean Air Act in 1990, the possibility of trading in Emission Reduction Credits has been looked upon as a strategy for improving the economic feasibility of solar projects. This paper discusses developments towards such a market and reviews current and proposed emission trading practices. The paper analyzes how the current characteristics of the market help or hinder the trading of credits generated by solar projects, and suggests possible solutions. Emission credits from four different solar projects and their trading potentials are presented

  8. Workplace injuries and risk reduction practices in Malaysia.

    Science.gov (United States)

    Ali, Roslinah; Shaharudin, Rafiza; Omar, Azahadi; Yusoff, Fadhli

    2012-01-01

    This study on workplace injuries and risk reduction practices was part of the Malaysia National Health Morbidity Survey III (NHMS III) conducted in 2006. This cross-sectional population-based survey was conducted to determine the incidence of workplaces injuries and assess the magnitude of some important risk reduction practices among workers. Data were gathered through face-to-face household interviews using a pre-coded questionnaire. Of the 22 880 eligible respondents, 88·2% (20 180) responded. The incidence rate for injuries at the workplace was 4·9 per 100 (95% CI: 4·6-5·2). The overall proportion of workers who had received occupational safety and health (OSH) training before or within 1 month of starting work was 33·6%. Among respondents who perceived that personal protective equipment (PPE) was required at their workplace, only 38·9% (95% CI: 37·8-39·4) were provided with it by their employers. Further studies are urgently needed to identify reasons for and management of the low uptake of risk reduction practices. This issue needs to be addressed to ensure the safety and health of our working population.

  9. The Risks of Investments in Transport Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    O. Pokorná

    2002-01-01

    Full Text Available Investment decisions should not be taken without an in-depth analysis of the risks. This is an important stage in project preparation and should be performed simultaneously with the planning of the financial operations. Infrastructure development requires that project risks and responsibilities be assigned to the public or private entity that is best able to manage them. The risks and their financial impacts are usually not quantified equally by all parties. Each party views the given risks according to the guarantees provided. These guarantees are related to the form of participation in the project.

  10. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  11. Security Risk Assessment in Software Development Projects

    OpenAIRE

    Svendsen, Heidi

    2017-01-01

    Software security is increasing in importance, linearly with vulnerabilities caused by software flaws. It is not possible to spend all the project s resources on software security. To spend the resources given to security in an effective way, one should know what is most important to protect. By performing a risk analysis the project know which vulnerabilities they face. A risk analysis will prioritise the vulnerabilities, and when the vulnerabilities are prioritised the project know where th...

  12. Evaluating a Health Risk Reduction Program.

    Science.gov (United States)

    Nagelberg, Daniel B.

    1981-01-01

    A health risk reduction program at Bowling Green State University (Ohio) tested the efficacy of peer education against the efficacy of returning (by mail) health questionnaire results. A peer health education program did not appear to be effective in changing student attitudes or lifestyles; however, the research methodology may not have been…

  13. The MERINOVA project: MEteorological RIsks as drivers of environmental inNOvation in Agro-ecosystem management

    Science.gov (United States)

    Gobin, Anne; Van de vijver, Hans; Zamani, Sepideh; Curnel, Yannick; Planchon, Viviane; Verspecht, Ann; Van Huylenbroeck, Guido

    2014-05-01

    Devastating weather-related events have captured the interest of the general public in Belgium. Extreme weather events such as droughts, heat waves and rain storms are projected to increase both in frequency and magnitude with climate change. Since more than half of the Belgian territory is managed by the agricultural sector, extreme events may have significant impacts on agro-ecosystem services and pose severe limitations to sustainable agricultural land management. The research hypothesis of the MERINOVA project is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management. The major objectives are to characterise extreme meteorological events, assess the impact on Belgian agro-ecosystems, characterise their vulnerability and resilience to these events, and explore innovative adaptation options to agricultural risk management. The project comprises of five major parts that reflect the chain of risks: the hazard, its impact on different agro-ecosystems, vulnerability, risk management and risk communication. Impacts developed from physically based models not only provide information on the state of the damage at any given time, but also assist in understanding the links between different factors causing damage and determining bio-physical vulnerability. Socio-economic impacts enlarge the basis for vulnerability mapping, risk management and adaptation options. The perspective of rising risk-exposure is exacerbated further by more limits to aid received for agricultural damage and an overall reduction of direct income support to farmers. The main findings of each of these project building blocks will be communicated. MERINOVA provides for a robust and flexible framework by demonstrating its performance across Belgian agro-ecosystems, and by ensuring its relevance to policy makers and practitioners. A strong expert and end-user network is established to help disseminating and exploiting project results to meet user needs. The

  14. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  15. An Assessment of risk response strategies practiced in software projects

    Directory of Open Access Journals (Sweden)

    Vanita Bhoola

    2014-11-01

    Full Text Available Risk management and success in projects are highly intertwined – better approaches to project risk management tend to increase chances of project success in terms of achieving scope & quality, schedule and cost targets. The process of responding to risk factors during a project’s life cycle is a crucial aspect of risk management referred to as risk response strategies, in this paper. The current research explores the status of risk response strategies applied in the software development projects in India. India provides a young IT-savvy English-speaking population, which is also cost effective. Other than the workforce, the environment for implementation of software projects in India is different from the matured economies. Risk management process is a commonly discussed theme, though its implementation in practice has a huge scope for improvement in India. The paper talks about four fundamental treatments to risk response – Avoidance, Transference, Mitigation and Acceptance (ATMA. From a primary data of 302 project managers, the paper attempts to address the risk response factors that lead to successful achievement of project scope & quality, schedule and cost targets, by using a series of regressions followed with Seemingly Unrelated Regression Equations (SURE modelling. Mitigation emerged as the most significant risk response strategy to achieve project targets. Acceptance, transference, and avoidance of risk were mostly manifested in the forms of transparency in communication across stakeholders, careful study of the nature of risks and close coordination between project team, customers/end-users and top management.

  16. Brief Communication: CATALYST - a multi-regional stakeholder Think Tank for fostering capacity development in disaster risk reduction and climate change adaptation

    NARCIS (Netherlands)

    Terwisscha van Scheltinga, C.T.H.M.; Hare, M.P.; Bers, van C.; Keur, van der P.

    2014-01-01

    This brief communication presents the work and objectives of the CATALYST project on "Capacity Development for Hazard Risk Reduction and Adaptation" funded by the European Commission (October 2011–September 2013). CATALYST set up a multi-regional think tank covering four regions (Central America and

  17. Risk management study for the Hanford Site facilities: Risk reduction cost comparison for the retired Hanford Site facilities. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Coles, G.A.; Egge, R.G.; Senger, E.; Shultz, M.W.; Taylor, W.E.

    1994-02-01

    This document provides a cost-comparison evaluation for implementing certain risk-reduction measures and their effect on the overall risk of the 100 and 200 Area retired, surplus facilities. The evaluation is based on conditions that existed at the time the risk evaluation team performed facility investigations, and does not acknowledge risk-reduction measures that occurred soon after risk identification. This evaluation is one part of an overall risk management study for these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1450-km{sup 2} Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30 km southeast of the 200 Area. This cost-comparison evaluation (1) determines relative costs for reducing risk to acceptable levels; (2) compares the cost of reducing risk using different risk-reduction options; and (3) compares the cost of reducing risks at different facilities. The result is an identification of the cost effective risk-reduction measures. Supporting information required to develop costs of the various risk-reduction options also is included.

  18. Disaster risk reduction capacity assessment for precarious settlements in Guatemala City.

    Science.gov (United States)

    Miles, Scott B; Green, Rebekah A; Svekla, Walter

    2012-07-01

    This study presents findings of an institutional capacity analysis of urban disaster risk reduction for informal settlements in the Guatemala Metropolitan Region. It uses a resource access perspective of vulnerability, actor-network theory, and qualitative data collection. The analysis reveals that there is interest in disaster risk reduction for the informal settlements; however, there is little in the way of direct financial or oversight relationships between informal settlement residents and all other actors. Respondents observed that informal settlements would probably remain inhabited; thus, there is a need for disaster risk reduction within these settlements. Disaster risk reduction capacity for informal settlements exists and can be further leveraged, as long as steps are taken to ensure appropriate access to and control of resources and oversight. Further, the nascent institutional arrangements should be strengthened through increased communication and coordination between actors, a decentralization of oversight and financial relationships, and mediation of identified resource conflicts. © 2012 The Author(s). Journal compilation © Overseas Development Institute, 2012.

  19. Risk management in a large-scale CO2 geosequestration pilot project, Illinois, USA

    Science.gov (United States)

    Hnottavange-Telleen, K.; Chabora, E.; Finley, R.J.; Greenberg, S.E.; Marsteller, S.

    2011-01-01

    Like most large-scale infrastructure projects, carbon dioxide (CO 2) geological sequestration (GS) projects have multiple success criteria and multiple stakeholders. In this context "risk evaluation" encompasses multiple scales. Yet a risk management program aims to maximize the chance of project success by assessing, monitoring, minimizing all risks in a consistent framework. The 150,000-km2 Illinois Basin underlies much of the state of Illinois, USA, and parts of adjacent Kentucky and Indiana. Its potential for CO2 storage is first-rate among basins in North America, an impression that has been strengthened by early testing of the injection well of the Midwest Geological Sequestration Consortium's (MGSC's) Phase III large scale demonstration project, the Illinois Basin - Decatur Project (IBDP). The IBDP, funded by the U.S. Department of Energy's National Energy Technology Laboratory (NETL), represents a key trial of GS technologies and project-management techniques. Though risks are specific to each site and project, IBDP risk management methodologies provide valuable experience for future GS projects. IBDP views risk as the potential for negative impact to any of these five values: health and safety, environment, financial, advancing the viability and public acceptability of a GS industry, and research. Research goals include monitoring one million metric tonnes of injected CO2 in the subsurface. Risk management responds to the ways in which any values are at risk: for example, monitoring is designed to reduce uncertainties in parameter values that are important for research and system control, and is also designed to provide public assurance. Identified risks are the primary basis for risk-reduction measures: risks linked to uncertainty in geologic parameters guide further characterization work and guide simulations applied to performance evaluation. Formally, industry defines risk (more precisely risk criticality) as the product L*S, the Likelihood multiplied

  20. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  1. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  2. Modeling Research Project Risks with Fuzzy Maps

    Science.gov (United States)

    Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana

    2009-01-01

    The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…

  3. Measuring the Value of Mortality Risk Reductions in Turkey

    Science.gov (United States)

    Tekeşin, Cem; Ara, Shihomi

    2014-01-01

    The willingness to pay (WTP) for mortality risk reduction from four causes (lung cancer, other type of cancer, respiratory disease, traffic accident) are estimated using random parameter logit model with data from choice experiment for three regions in Turkey. The value of statistical life (VSL) estimated for Afsin-Elbistan, Kutahya-Tavsanli, Ankara and the pooled case are found as 0.56, 0.35, 0.46 and 0.49 million Purchasing Power Parity (PPP) adjusted 2012 US dollars (USD). Different types of risk cause different VSL estimates and we found the lung cancer premium of 213% against traffic accident. The effects of one-year-delayed provision of risk-reduction service are the reduction of WTP by 482 TL ($318 in PPP adjusted USD) per person on average, and the disutility from status-quo (zero risk reduction) against alternative is found to be 891 TL ($589 in PPP adjusted USD) per person on average. Senior discounts of VSL are partially determined by status-quo preference and the amount of discount decreases once the status-quo bias is removed. The peak VSL is found to be for the age group 30–39 and the average VSL for the age group is 0.8 million PPP adjusted USD). Turkey’s compliance to European Union (EU) air quality standard will cause welfare gains of total 373 million PPP adjusted USD for our study areas in terms of reduced number of premature mortality. PMID:25000150

  4. Measuring the Value of Mortality Risk Reductions in Turkey

    Directory of Open Access Journals (Sweden)

    Cem Tekeşin

    2014-07-01

    Full Text Available The willingness to pay (WTP for mortality risk reduction from four causes (lung cancer, other type of cancer, respiratory disease, traffic accident are estimated using random parameter logit model with data from choice experiment for three regions in Turkey. The value of statistical life (VSL estimated for Afsin-Elbistan, Kutahya-Tavsanli, Ankara and the pooled case are found as 0.56, 0.35, 0.46 and 0.49 million Purchasing Power Parity (PPP adjusted 2012 US dollars (USD. Different types of risk cause different VSL estimates and we found the lung cancer premium of 213% against traffic accident. The effects of one-year-delayed provision of risk-reduction service are the reduction of WTP by 482 TL ($318 in PPP adjusted USD per person on average, and the disutility from status-quo (zero risk reduction against alternative is found to be 891 TL ($589 in PPP adjusted USD per person on average. Senior discounts of VSL are partially determined by status-quo preference and the amount of discount decreases once the status-quo bias is removed. The peak VSL is found to be for the age group 30–39 and the average VSL for the age group is 0.8 million PPP adjusted USD. Turkey’s compliance to European Union (EU air quality standard will cause welfare gains of total 373 million PPP adjusted USD for our study areas in terms of reduced number of premature mortality.

  5. Method ranks competing projects by priorities, risk

    International Nuclear Information System (INIS)

    Moeckel, D.R.

    1993-01-01

    A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerning various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time

  6. Evaluating the risk-reduction benefits of wind energy

    Energy Technology Data Exchange (ETDEWEB)

    Brower, M.C. [Brower & Company, Andover, MA (United States); Bell, K. [Convergence Research, Seattle, WA (United States); Bernow, S.; Duckworth, M. [Tellus Inst., Boston, MA (United States); Spinney P. [Charles River Associates, Boston, MA (United States)

    1996-12-31

    This paper presents preliminary results of a study to evaluate the risk-reduction benefits of wind power for a case study utility system using decision analysis techniques. The costs and risks of two alternative decisions-whether to build a 400 MW gas-fired combined cycle plant or a 1600 MW wind plant in 2003-were compared through computer simulations as fuel prices, environmental regulatory costs, wind and conventional power plant availability, and load growth were allowed to vary. Three different market scenarios were examined: traditional regulation, a short-term power pool, and fixed-price contracts of varying duration. The study concludes that, from the perspective of ratepayers, wind energy provides a net levelized risk-reduction benefit of $3.4 to $7.8/MWh under traditional regulation, and less in the other scenarios. From the perspective of the utility plant owners, wind provides a significant risk benefit in the unregulated market scenarios but none in a regulated market. The methodology and findings should help inform utility resource planning and industry restructuring efforts. 2 figs., 3 tabs.

  7. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  8. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  9. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  10. Incorporating the Technology Roadmap Uncertainties into the Project Risk Assessment

    International Nuclear Information System (INIS)

    Bonnema, B.E.

    2002-01-01

    This paper describes two methods, Technology Roadmapping and Project Risk Assessment, which were used to identify and manage the technical risks relating to the treatment of sodium bearing waste at the Idaho National Engineering and Environmental Laboratory. The waste treatment technology under consideration was Direct Vitrification. The primary objective of the Technology Roadmap is to identify technical data uncertainties for the technologies involved and to prioritize the testing or development studies to fill the data gaps. Similarly, project management's objective for a multi-million dollar construction project includes managing all the key risks in accordance to DOE O 413.3 - ''Program and Project Management for the Acquisition of Capital Assets.'' In the early stages, the Project Risk Assessment is based upon a qualitative analysis for each risk's probability and consequence. In order to clearly prioritize the work to resolve the technical issues identified in the Technology Roadmap, the issues must be cross- referenced to the project's Risk Assessment. This will enable the project to get the best value for the cost to mitigate the risks

  11. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  12. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  13. Comparative Effectiveness of Personalized Lifestyle Management Strategies for Cardiovascular Disease Risk Reduction.

    Science.gov (United States)

    Chu, Paula; Pandya, Ankur; Salomon, Joshua A; Goldie, Sue J; Hunink, M G Myriam

    2016-03-29

    Evidence shows that healthy diet, exercise, smoking interventions, and stress reduction reduce cardiovascular disease risk. We aimed to compare the effectiveness of these lifestyle interventions for individual risk profiles and determine their rank order in reducing 10-year cardiovascular disease risk. We computed risks using the American College of Cardiology/American Heart Association Pooled Cohort Equations for a variety of individual profiles. Using published literature on risk factor reductions through diverse lifestyle interventions-group therapy for stopping smoking, Mediterranean diet, aerobic exercise (walking), and yoga-we calculated the risk reduction through each of these interventions to determine the strategy associated with the maximum benefit for each profile. Sensitivity analyses were conducted to test the robustness of the results. In the base-case analysis, yoga was associated with the largest 10-year cardiovascular disease risk reductions (maximum absolute reduction 16.7% for the highest-risk individuals). Walking generally ranked second (max 11.4%), followed by Mediterranean diet (max 9.2%), and group therapy for smoking (max 1.6%). If the individual was a current smoker and successfully quit smoking (ie, achieved complete smoking cessation), then stopping smoking yielded the largest reduction. Probabilistic and 1-way sensitivity analysis confirmed the demonstrated trend. This study reports the comparative effectiveness of several forms of lifestyle modifications and found smoking cessation and yoga to be the most effective forms of cardiovascular disease prevention. Future research should focus on patient adherence to personalized therapies, cost-effectiveness of these strategies, and the potential for enhanced benefit when interventions are performed simultaneously rather than as single measures. © 2016 The Authors. Published on behalf of the American Heart Association, Inc., by Wiley Blackwell.

  14. Using prior risk-related knowledge to support risk management decisions: lessons learnt from a tunneling project.

    Science.gov (United States)

    Cárdenas, Ibsen Chivatá; Al-Jibouri, Saad S H; Halman, Johannes I M; van de Linde, Wim; Kaalberg, Frank

    2014-10-01

    The authors of this article have developed six probabilistic causal models for critical risks in tunnel works. The details of the models' development and evaluation were reported in two earlier publications of this journal. Accordingly, as a remaining step, this article is focused on the investigation into the use of these models in a real case study project. The use of the models is challenging given the need to provide information on risks that usually are both project and context dependent. The latter is of particular concern in underground construction projects. Tunnel risks are the consequences of interactions between site- and project-specific factors. Large variations and uncertainties in ground conditions as well as project singularities give rise to particular risk factors with very specific impacts. These circumstances mean that existing risk information, gathered from previous projects, is extremely difficult to use in other projects. This article considers these issues and addresses the extent to which prior risk-related knowledge, in the form of causal models, as the models developed for the investigation, can be used to provide useful risk information for the case study project. The identification and characterization of the causes and conditions that lead to failures and their interactions as well as their associated probabilistic information is assumed to be risk-related knowledge in this article. It is shown that, irrespective of existing constraints on using information and knowledge from past experiences, construction risk-related knowledge can be transferred and used from project to project in the form of comprehensive models based on probabilistic-causal relationships. The article also shows that the developed models provide guidance as to the use of specific remedial measures by means of the identification of critical risk factors, and therefore they support risk management decisions. Similarly, a number of limitations of the models are

  15. Landslide risk reduction strategies: an inventory for the Global South

    Science.gov (United States)

    Maes, Jan; Kervyn, Matthieu; Vranken, Liesbet; Dewitte, Olivier; Vanmaercke, Matthias; Mertens, Kewan; Jacobs, Liesbet; Poesen, Jean

    2015-04-01

    Landslides constitute a serious problem globally. Moreover, landslide impact remains underestimated especially in the Global South. It is precisely there where the largest impact is experienced. An overview of measures taken to reduce risk of landslides in the Global South is however still lacking. Because in many countries of the Global South disaster risk reduction (DRR) is at an emerging stage, it is crucial to monitor the ongoing efforts (e.g. discussions on the Post-2015 Framework for DRR). The first objective of this study is to make an inventory of techniques and strategies that are applied to reduce risk from landslides in tropical countries. The second objective is to investigate what are the main bottlenecks for implementation of DRR strategies. In order to achieve these objectives, a review of both scientific and grey literature was conducted, supplemented with expert knowledge. The compilation of recommended and implemented DRR measures from landslide-prone tropical countries is based on an adapted classification proposed by the SafeLand project. According to Vaciago (2013), landslide risk can be reduced by either reducing the hazard, the vulnerability, the number or value of elements at risk or by sharing the residual risk. In addition, these measures can be combined with education and/or awareness raising and are influenced by governance structures and cultural beliefs. Global landslide datasets have been used to identify landslide-prone countries, augmented with region-specific datasets. Countries located in the tropics were selected in order to include landslide-prone countries with a different Human Development Index (HDI) but with a similar climate. Preliminary results support the statement made by Anderson (2013) that although the importance of shifting from post-disaster emergency actions to pre-disaster mitigation is acknowledged, in practice this paradigm shift seems rather limited. It is expected that this is especially the case in countries

  16. Breast and Ovarian Cancer Risk and Risk Reduction in Jewish BRCA1/2 Mutation Carriers

    Science.gov (United States)

    Finkelman, Brian S.; Rubinstein, Wendy S.; Friedman, Sue; Friebel, Tara M.; Dubitsky, Shera; Schonberger, Niecee Singer; Shoretz, Rochelle; Singer, Christian F.; Blum, Joanne L.; Tung, Nadine; Olopade, Olufunmilayo I.; Weitzel, Jeffrey N.; Lynch, Henry T.; Snyder, Carrie; Garber, Judy E.; Schildkraut, Joellen; Daly, Mary B.; Isaacs, Claudine; Pichert, Gabrielle; Neuhausen, Susan L.; Couch, Fergus J.; van't Veer, Laura; Eeles, Rosalind; Bancroft, Elizabeth; Evans, D. Gareth; Ganz, Patricia A.; Tomlinson, Gail E.; Narod, Steven A.; Matloff, Ellen; Domchek, Susan; Rebbeck, Timothy R.

    2012-01-01

    Purpose Mutations in BRCA1/2 dramatically increase the risk of both breast and ovarian cancers. Three mutations in these genes (185delAG, 5382insC, and 6174delT) occur at high frequency in Ashkenazi Jews. We evaluated how these common Jewish mutations (CJMs) affect cancer risks and risk reduction. Methods Our cohort comprised 4,649 women with disease-associated BRCA1/2 mutations from 22 centers in the Prevention and Observation of Surgical End Points Consortium. Of these women, 969 were self-identified Jewish women. Cox proportional hazards models were used to estimate breast and ovarian cancer risks, as well as risk reduction from risk-reducing salpingo-oophorectomy (RRSO), by CJM and self-identified Jewish status. Results Ninety-one percent of Jewish BRCA1/2-positive women carried a CJM. Jewish women were significantly more likely to undergo RRSO than non-Jewish women (54% v 41%, respectively; odds ratio, 1.87; 95% CI, 1.44 to 2.42). Relative risks of cancer varied by CJM, with the relative risk of breast cancer being significantly lower in 6174delT mutation carriers than in non-CJM BRCA2 carriers (hazard ratio, 0.35; 95% CI, 0.18 to 0.69). No significant difference was seen in cancer risk reduction after RRSO among subgroups. Conclusion Consistent with previous results, risks for breast and ovarian cancer varied by CJM in BRCA1/2 carriers. In particular, 6174delT carriers had a lower risk of breast cancer. This finding requires additional confirmation in larger prospective and population-based cohort studies before being integrated into clinical care. PMID:22430266

  17. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  18. ASTARTE: Assessment Strategy and Risk Reduction for Tsunamis in Europe

    Science.gov (United States)

    Baptista, M. A.; Yalciner, A. C.; Canals, M.

    2014-12-01

    enhancement of the Tsunami Warning System in the NEAM region in terms of monitoring, early warning and forecast, governance and resilience. This work is funded by project ASTARTE - Assessment, STrategy And Risk Reduction for Tsunamis in Europe. Grant 603839, 7th FP (ENV.2013.6.4-3 ENV.2013.6.4-3)

  19. [Smoking fewer cigarettes per day may determine a significant risk reduction in developing smoking attributable diseases? Is there a risk reduction for e-cigarette users?].

    Science.gov (United States)

    Pieri, Luca; Chellini, Elisabetta; Gorini, Giuseppe

    2014-01-01

    Among Italian smokers--about 10 millions in 2013--about 600,000 began using electronic cigarettes (e-cigs) in last years. About 10% of e-cig users quitted smoking tobacco, whereas the 90% was dual users. Among them, about three out of four decreased the number of cigarettes smoked per day (cig/day), but did not quit. How many fewer cigarettes a smoker has to smoke to obtain significant health benefits? Is there a threshold? In order to observe a significant 27% reduction in the risk of developing lung cancer, a smoker must reduce the number of cig/day by at least 50%, while for the other smoking-related diseases (acute myocardial infarction - AMI, stroke, chronic obstructive pulmonary diseases), halving the number of cig/day did not drive to a significant risk reduction. Even smoking 5 cig/day increases the risk of AMI, whereas it significantly lowers the risk of lung cancer. Obviously, quitting smoking is the best choice to highly reduce risks for all smoking-related diseases. Therefore, in order to achieve significant risk reductions, e-cig users should quit smoking as first choice, or, if they feel it is impossible to them, reduce the consumption of traditional cigarettes to less than 5 cig/day.

  20. Chernobyl risk reduction via ventilation stack repair: a successful international project

    International Nuclear Information System (INIS)

    Gore, B.F.; Glukhov, A.Y.; Schmidt, J.P.; Vargo, G.I.; Osterloh, J.V.; Kupny, V.I.; Korneev, A.A.; Matvejev, Y.A.

    1999-01-01

    The recently completed project to repair the ChNPP Unit 3/4 ventilation stack is the first international project providing a direct physical improvement and safety upgrade at the Shelter (Ukrytie) facility. The 1986 explosion at Chernobyl NPP Unit 4 severely damaged the ventilation stack framework of bracing and its foundation. At one node, where six elements of the framework joined together, one element was completely missing one element was torn from the node and left hanging from its other end, and one element was badly bent and dented. Foundation supports were knocked measurably off plumb. Repair of the ChNPP ventilation stack is the first international project providing direct physical improvement and safety upgrade at the Shelter facility. The repairs have restored the stack to full design strength, from an emergency condition with a high probability of collapse

  1. New GOES-R Risk Reduction Activities at CIRA

    Science.gov (United States)

    Rogers, M. A.; Miller, S. D.; Grasso, L. D.; Haynes, J. M.; NOH, Y. J.; Forsythe, J.; Zupanski, M.; Lindsey, D. T.

    2017-12-01

    A team of atmospheric scientists at the Cooperative Institute for Research in the Atmosphere (CIRA) at the Colorado State University has been selected by the National Oceanic and Atmospheric Administration's (NOAA) GOES-R Risk Reduction (GOES-R3) science program to develop applications to enhance the utilization of the GOES-R sensors, including the Advanced Baseline Imager (ABI) and the Geostationary Lightning Mapper (GLM). The selected project topics follow NOAA's Research and Development Objectives listed in its 5-year Strategic Plan. The projects will be carried out over a three-year period which started on 1 July 2017 and will end on 30 June 2019. CIRA is working on five GOES-R3 application developments: 1) Developing an Environmental Awareness Repertoire of ABI Imagery (`DEAR-ABII') to Advise the Operational Weather Forecaster. DEAR-ABII maximizes the vast potential of the new GOES-R/GOES-16 sensor technology. 2) GOES-R ABI channel differencing used to reveal cloud-free zones of `precursors of convective initiation'. This product identifies where convective initiation may occur in cloud free skies. 3) Improving the ABI Cloud Layers Product for Multiple Layer Cloud Systems and Aviation Forecast Applications. This project aims to improve the GOES-16 cloud layer product by providing information on the boundaries of cloud layers even when one layer overlies another. 4) Using the New Capabilities of GOES-R to Improve Blended, Multisensor Water Vapor Products for Forecasters. GOES-R TPW retrievals will be merged with TPW derived from polar orbiter and surface data to improve the operational NOAA blended TPW product. 5) Data assimilation of GLM observations in HWRF/GSI system. Assimilation of GOES-R GLM observations for the NOAA operational hurricane model with the goal to improve operational hurricane forecasting. Examples for each of these applications will be presented.

  2. Climate change, uncertainty and investment in flood risk reduction

    OpenAIRE

    Pol, van der, T.D.

    2015-01-01

    Economic analysis of flood risk management strategies has become more complex due to climate change. This thesis investigates the impact of climate change on investment in flood risk reduction, and applies optimisation methods to support identification of optimal flood risk management strategies. Chapter 2 provides an overview of cost-benefit analysis (CBA) of flood risk management strategies under climate change uncertainty and new information. CBA is applied to determine optimal dike height...

  3. WAYS TO IMPROVE RISK MANAGEMENT IN COMPLEX PROJECTS

    Directory of Open Access Journals (Sweden)

    Emilia IORDACHE

    2012-01-01

    Full Text Available Risk is present in all human activities; it can be associated with health, security, economy or environment. The goal of risk management is to control, prevent or decrease potential damages. Technically speaking, risk management means all the activities coordinated so as to orient and monitor an organization from the risk perspective. Risk management helps formulate the most adequate decisions by taking account of uncertainties and their effects upon the accomplishment of proposed goals, and argues the need to lay down and implement coercive, preventive actions typical of the management of a company. The benefits of good risk management and also the consequences of bad management shall undoubtedly be felt by an organization’s board, employees, shareholders, customers as well as by all other entities concerned with organizational performance. Projects generally include a number of risks in common with those in business as well as certain typical ones. In complex projects, it is this very feature – complexity – which generates the need to implement risk management for the purpose to diminish, remove, and monitor the risks which can influence the development of a project.

  4. Data base on nuclear power plant dose reduction research projects

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated.

  5. Data base on nuclear power plant dose reduction research projects

    International Nuclear Information System (INIS)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated

  6. Risk assessment for construction projects of transport infrastructure objects

    Science.gov (United States)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  7. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  8. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  9. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  10. Effect of risk aversion on prioritizing conservation projects.

    Science.gov (United States)

    Tulloch, Ayesha I T; Maloney, Richard F; Joseph, Liana N; Bennett, Joseph R; Di Fonzo, Martina M I; Probert, William J M; O'Connor, Shaun M; Densem, Jodie P; Possingham, Hugh P

    2015-04-01

    Conservation outcomes are uncertain. Agencies making decisions about what threat mitigation actions to take to save which species frequently face the dilemma of whether to invest in actions with high probability of success and guaranteed benefits or to choose projects with a greater risk of failure that might provide higher benefits if they succeed. The answer to this dilemma lies in the decision maker's aversion to risk--their unwillingness to accept uncertain outcomes. Little guidance exists on how risk preferences affect conservation investment priorities. Using a prioritization approach based on cost effectiveness, we compared 2 approaches: a conservative probability threshold approach that excludes investment in projects with a risk of management failure greater than a fixed level, and a variance-discounting heuristic used in economics that explicitly accounts for risk tolerance and the probabilities of management success and failure. We applied both approaches to prioritizing projects for 700 of New Zealand's threatened species across 8303 management actions. Both decision makers' risk tolerance and our choice of approach to dealing with risk preferences drove the prioritization solution (i.e., the species selected for management). Use of a probability threshold minimized uncertainty, but more expensive projects were selected than with variance discounting, which maximized expected benefits by selecting the management of species with higher extinction risk and higher conservation value. Explicitly incorporating risk preferences within the decision making process reduced the number of species expected to be safe from extinction because lower risk tolerance resulted in more species being excluded from management, but the approach allowed decision makers to choose a level of acceptable risk that fit with their ability to accommodate failure. We argue for transparency in risk tolerance and recommend that decision makers accept risk in an adaptive management

  11. 76 FR 44301 - Information Collection; Homeowner Risk Reduction Behaviors Concerning Wildfire Risks and Climate...

    Science.gov (United States)

    2011-07-25

    ... the design of more effective risk mitigation projects and improved communication strategies among.... This information will assist the Forest Service in their risk communication efforts with ``at risk... of California State University of Long Beach, Long Beach, California. The results will be made...

  12. Long-Term International Space Station (ISS) Risk Reduction Activities

    Science.gov (United States)

    Fodroci, M. P.; Gafka, G. K.; Lutomski, M. G.; Maher, J. S.

    2012-01-01

    As the assembly of the ISS nears completion, it is worthwhile to step back and review some of the actions pursued by the Program in recent years to reduce risk and enhance the safety and health of ISS crewmembers, visitors, and space flight participants. While the initial ISS requirements and design were intended to provide the best practicable levels of safety, it is always possible to further reduce risk - given the determination, commitment, and resources to do so. The following is a summary of some of the steps taken by the ISS Program Manager, by our International Partners, by hardware and software designers, by operational specialists, and by safety personnel to continuously enhance the safety of the ISS, and to reduce risk to all crewmembers. While years of work went into the development of ISS requirements, there are many things associated with risk reduction in a Program like the ISS that can only be learned through actual operational experience. These risk reduction activities can be divided into roughly three categories: Areas that were initially noncompliant which have subsequently been brought into compliance or near compliance (i.e., Micrometeoroid and Orbital Debris [MMOD] protection, acoustics) Areas where initial design requirements were eventually considered inadequate and were subsequently augmented (i.e., Toxicity Hazard Level- 4 [THL] materials, emergency procedures, emergency equipment, control of drag-throughs) Areas where risks were initially underestimated, and have subsequently been addressed through additional mitigation (i.e., Extravehicular Activity [EVA] sharp edges, plasma shock hazards) Due to the hard work and cooperation of many parties working together across the span of more than a decade, the ISS is now a safer and healthier environment for our crew, in many cases exceeding the risk reduction targets inherent in the intent of the original design. It will provide a safe and stable platform for utilization and discovery for years

  13. Household flood risk reduction in the Czech Republic

    Czech Academy of Sciences Publication Activity Database

    Duží, B.; Vikhrov, Dmytro; Kelman, I.; Stojanov, R.; Jakubínský, J.

    2015-01-01

    Roč. 20, č. 4 (2015), s. 499-504 ISSN 1381-2386 Institutional support: RVO:67985998 Keywords : flood risk reduction * household adaptation * Czech Republic Subject RIV: AH - Economics Impact factor: 3.085, year: 2015

  14. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  15. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  16. Risk-profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as an insurance vehicle and can be used at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. Either futures of swaps can be used to guarantee or modify product prices. While this does not necessarily maximize cash flow or present worth, it can protect a project or company for several years from downside price risk, thereby reducing the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cash flows or net incomes. This paper reports that reducing risk by limiting downside price exposure could alter budgeting decisions, allow continued or expanded operations of a particular property, or increase debt capacity

  17. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  18. Household flood risk reduction in the Czech Republic

    Czech Academy of Sciences Publication Activity Database

    Duží, B.; Vikhrov, Dmytro; Kelman, I.; Stojanov, R.; Jakubínský, J.

    2015-01-01

    Roč. 20, č. 4 (2015), s. 499-504 ISSN 1381-2386 Institutional support: PRVOUK-P23 Keywords : flood risk reduction * household adaptation * Czech Republic Subject RIV: AH - Economics Impact factor: 3.085, year: 2015

  19. The Maui's Dolphin Challenge: Lessons from a School-Based Litter Reduction Project

    Science.gov (United States)

    Townrow, Carly S.; Laurence, Nick; Blythe, Charlotte; Long, Jenny; Harré, Niki

    2016-01-01

    The Maui's Dolphin Challenge was a litter reduction project that was run twice at a secondary school in Aotearoa New Zealand. The project drew on a theoretical framework encompassing four psycho-social principles: values, embodied learning, efficacy, and perceived social norms. It challenged students to reduce the litter at the school by offering…

  20. Failure detection system risk reduction assessment

    Science.gov (United States)

    Aguilar, Robert B. (Inventor); Huang, Zhaofeng (Inventor)

    2012-01-01

    A process includes determining a probability of a failure mode of a system being analyzed reaching a failure limit as a function of time to failure limit, determining a probability of a mitigation of the failure mode as a function of a time to failure limit, and quantifying a risk reduction based on the probability of the failure mode reaching the failure limit and the probability of the mitigation.

  1. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  2. Managing a complex project using a risk-risk multiple domain matrix

    International Nuclear Information System (INIS)

    Pointurier, C.; Marle, F.; Jaber, H.

    2014-01-01

    This communication aims at presenting a clustering methodology applied to a complex project consisting of the delivery of three interdependent subsystems. This enables small and complementary task forces to be constituted, enhancing the communication and coordination on transverse issues related to the complexity of the whole system. The problem is to gather and exploit data for such systems, with numerous and heterogeneous risks of different domains (product, process, organization). The method consists in regrouping actors through the clustering of the risks they own. The result is a highlight on important and transverse risk interdependencies, within and between projects. These should not be neglected in order to avoid potential severe issues, whether during the project or during the exploitation of its deliverable. An application on a real program of plant implementation in the CEA-DAM is presented, with a sensitivity analysis of the clustering results to the inputs and chosen configurations of the problem. (authors)

  3. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  4. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  5. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  6. Microenterprise development interventions for sexual risk reduction: a systematic review.

    Science.gov (United States)

    Cui, Rosa R; Lee, Ramon; Thirumurthy, Harsha; Muessig, Kathryn E; Tucker, Joseph D

    2013-11-01

    Comprehensive interventions that address both individual and structural determinants associated with HIV/STI risk are gaining increasing attention over the past decade. Microenterprise development offers an appealing model for HIV prevention by addressing poverty and gender equality. This study systematically reviewed the effects of microenterprise development interventions on HIV/STI incidence and sexual risk behaviors. Microenterprise development was defined as developing small business capacity among individuals to alleviate poverty. Seven eligible research studies representing five interventions were identified and included in this review. All of the studies targeted women, and three focused on sex workers. None measured biomarker outcomes. All three sex worker studies showed significant reduction in sexual risk behaviors when compared to the control group. Non-sex worker studies showed limited changes in sexual risk behavior. This review indicates the potential utility of microenterprise development in HIV risk reduction programs. More research is needed to determine how microenterprise development can be effectively incorporated in comprehensive HIV control strategies.

  7. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  8. Setting priorities for private land conservation in fire-prone landscapes: Are fire risk reduction and biodiversity conservation competing or compatible objectives?

    Science.gov (United States)

    Syphard, Alexandra D.; Butsic, Van; Bar-Massada, Avi; Keeley, Jon E.; Tracey, Jeff A.; Fisher, Robert N.

    2016-01-01

    Although wildfire plays an important role in maintaining biodiversity in many ecosystems, fire management to protect human assets is often carried out by different agencies than those tasked for conserving biodiversity. In fact, fire risk reduction and biodiversity conservation are often viewed as competing objectives. Here we explored the role of management through private land conservation and asked whether we could identify private land acquisition strategies that fulfill the mutual objectives of biodiversity conservation and fire risk reduction, or whether the maximization of one objective comes at a detriment to the other. Using a fixed budget and number of homes slated for development, we simulated 20 years of housing growth under alternative conservation selection strategies, and then projected the mean risk of fires destroying structures and the area and configuration of important habitat types in San Diego County, California, USA. We found clear differences in both fire risk projections and biodiversity impacts based on the way conservation lands are prioritized for selection, but these differences were split between two distinct groupings. If no conservation lands were purchased, or if purchases were prioritized based on cost or likelihood of development, both the projected fire risk and biodiversity impacts were much higher than if conservation lands were purchased in areas with high fire hazard or high species richness. Thus, conserving land focused on either of the two objectives resulted in nearly equivalent mutual benefits for both. These benefits not only resulted from preventing development in sensitive areas, but they were also due to the different housing patterns and arrangements that occurred as development was displaced from those areas. Although biodiversity conflicts may still arise using other fire management strategies, this study shows that mutual objectives can be attained through land-use planning in this region. These results likely

  9. Risk Assessment of Engineering Project Financing Based on PPP Model

    Directory of Open Access Journals (Sweden)

    Ma Qiuli

    2017-01-01

    Full Text Available At present, the project financing channel is single, and the urban facilities are in short supply, and the risk assessment and prevention mechanism of financing should be further improved to reduce the risk of project financing. In view of this, the fuzzy comprehensive evaluation model of project financing risk which combined the method of fuzzy comprehensive evaluation and analytic hierarchy process is established. The scientificalness and effectiveness of the model are verified by the example of the world port project in Luohe city, and it provides basis and reference for engineering project financing based on PPP mode.

  10. An interdisciplinary approach to volcanic risk reduction under conditions of uncertainty: a case study of Tristan da Cunha

    Science.gov (United States)

    Hicks, A.; Barclay, J.; Simmons, P.; Loughlin, S.

    2014-07-01

    The uncertainty brought about by intermittent volcanic activity is fairly common at volcanoes worldwide. While better knowledge of any one volcano's behavioural characteristics has the potential to reduce this uncertainty, the subsequent reduction of risk from volcanic threats is only realised if that knowledge is pertinent to stakeholders and effectively communicated to inform good decision making. Success requires integration of methods, skills and expertise across disciplinary boundaries. This research project develops and trials a novel interdisciplinary approach to volcanic risk reduction on the remote volcanic island of Tristan da Cunha (South Atlantic). For the first time, volcanological techniques, probabilistic decision support and social scientific methods were integrated in a single study. New data were produced that (1) established no spatio-temporal pattern to recent volcanic activity; (2) quantified the high degree of scientific uncertainty around future eruptive scenarios; (3) analysed the physical vulnerability of the community as a consequence of their geographical isolation and exposure to volcanic hazards; (4) evaluated social and cultural influences on vulnerability and resilience; and (5) evaluated the effectiveness of a scenario planning approach, both as a method for integrating the different strands of the research and as a way of enabling on-island decision makers to take ownership of risk identification and management, and capacity building within their community. The paper provides empirical evidence of the value of an innovative interdisciplinary framework for reducing volcanic risk. It also provides evidence for the strength that comes from integrating social and physical sciences with the development of effective, tailored engagement and communication strategies in volcanic risk reduction.

  11. Incentivising flood risk adaptation through ris based insurance premiums: trade-offs between affordability and risk reduction

    NARCIS (Netherlands)

    Hudson, P.G.M.B.; Botzen, W.J.W.; Feyen, L.; Aerts, J.C.J.H.

    2016-01-01

    The financial incentives offered by the risk-based pricing of insurance can stimulate policyholder adaptation to flood risk while potentially conflicting with affordability. We examine the trade-off between risk reduction and affordability in a model of public-private flood insurance in France and

  12. Estimating the Value of Price Risk Reduction in Energy Efficiency Investments in Buildings

    Directory of Open Access Journals (Sweden)

    Pekka Tuominen

    2017-10-01

    Full Text Available This paper presents a method for calculating the value of price risk reduction to a consumer that can be achieved with investments in energy efficiency. The value of price risk reduction is discussed to some length in general terms in the literature reviewed but, so far, no methodology for calculating the value has been presented. Here we suggest such a method. The problem of valuating price risk reduction is approached using a variation of the Black–Scholes model by considering a hypothetical financial instrument that a consumer would purchase to insure herself against unexpected price hikes. This hypothetical instrument is then compared with an actual energy efficiency investment that reaches the same level of price risk reduction. To demonstrate the usability of the method, case examples are calculated for typical single-family houses in Finland. The results show that the price risk entailed in household energy consumption can be reduced by a meaningful amount with energy efficiency investments, and that the monetary value of this reduction can be calculated. It is argued that this often-overlooked benefit of energy efficiency investments merits more consideration in future studies.

  13. Farmers Prone to Drought Risk: Why Some Farmers Undertake Farm-Level Risk-Reduction Measures While Others Not?

    Science.gov (United States)

    Gebrehiwot, Tagel; van der Veen, Anne

    2015-03-01

    This research investigates farmers' cognitive perceptions of risk and the behavioral intentions to undertake farm-level risk-reduction measures. It has been observed that people who are susceptible to natural hazards often fail to act, or do very little, to protect their assets or lives. To answer the question of why some people show adaptive behavior while others do not, a socio-psychological model of precautionary adaptation based on protection motivation theory and trans-theoretical stage model has been applied for the first time to areas of drought risk in the developing countries cultural context. The applicability of the integrated model is explored by means of a representative sample survey of smallholder farmers in northern Ethiopia. The result of the study showed that there is a statistically significant association between farmer's behavioral intention to undertake farm-level risk-reduction measures and the main important protection motivation model variables. High perceived vulnerability, severity of consequences, self-efficacy, and response efficacy lead to higher levels of behavioral intentions to undertake farm-level risk-reduction measures. For farmers in the action stage, self-efficacy and response efficacy were the main motivators of behavioral intention. For farmers in the contemplative stage, self-efficacy and cost appear to be the main motivators for them to act upon risk reduction, while perceived severity of consequences and cost of response actions were found to be important for farmers in the pre-contemplative stage.

  14. Risk Management and Uncertainty in Large Complex Public Projects

    DEFF Research Database (Denmark)

    Neerup Themsen, Tim; Harty, Chris; Tryggestad, Kjell

    Governmental actors worldwide are promoting risk management as a rational approach to man-age uncertainty and improve the abilities to deliver large complex projects according to budget, time plans, and pre-set project specifications: But what do we know about the effects of risk management...... on the abilities to meet such objectives? Using Callon’s (1998) twin notions of framing and overflowing we examine the implementation of risk management within the Dan-ish public sector and the effects this generated for the management of two large complex pro-jects. We show how the rational framing of risk...... management have generated unexpected costly outcomes such as: the undermining of the longer-term value and societal relevance of the built asset, the negligence of the wider range of uncertainties emerging during project processes, and constraining forms of knowledge. We also show how expert accountants play...

  15. Data base on dose reduction research projects for nuclear power plants. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K. [Brookhaven National Lab., Upton, NY (United States)

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report.

  16. Investigating obesity risk-reduction behaviours and psychosocial factors in Chinese Americans.

    Science.gov (United States)

    Liou, Doreen; Bauer, Kathleen; Bai, Yeon

    2014-11-01

    The purpose of this research was to examine the attitudes, beliefs and behaviours related to obesity risk reduction in Chinese Americans. A questionnaire was administered to a convenience sample of 300 US-born and foreign-born Chinese Americans residing in the New York metropolitan area, ranging from 18 to 40 years of age. Obesity risk reduction behaviours and psychosocial variables derived from the Theory of Planned Behaviour and Health Belief Model were measured. Acculturation was assessed using a modified Suinn-Lew Asian Self-Identity Acculturation Scale. Frequency distributions were delineated and stepwise regression analyses were analysed for different acculturation groups. 65% of the respondents were female and the mean age of the sample was 26 years. Respondents indicated the most commonly practised behaviour to be eating home-cooked meals instead of restaurant-prepared foods. Perceived barriers to adopting obesity risk-reduction behaviours included convenience of consuming fast foods, cost, lack of time to prepare home-cooked meals, and the physical environment of unhealthy foods. In predicting intention to perform obesity risk-reduction behaviours, attitude was significant for 'western-identified' individuals. In 'Asian-identified' individuals, perceived behavioural control, self-efficacy and perceived benefits were salient. Nutrition educators working with Chinese Americans need to address self-efficacy in preparing plant-based, home-cooked meals and making healthy choices at fast-food restaurants with portion control. Concrete and perceived barriers such as lack of time and convenience need to be addressed in nutrition education interventions. Educators need to identify new channels and media outlets to disseminate practical, easy-to-implement behaviours for obesity risk reduction that are socially acceptable. © Royal Society for Public Health 2013.

  17. Pengaruh Brand Credibility Terhadap Information Efficiency Dan Risk Reduction, Serta Dampaknya Atas Repurchase Intention

    OpenAIRE

    Faisal, Aekram

    2015-01-01

    This research conducted to know the influence of Brand Credibility to Information efficiency and Risk reduction, also the influence of Information efficiency and Risk reduction to Repurchase intention. This research aimed to know the influence of Brand Credibility to Repurchase intention that mediated by Information efficiency and Risk reduction. The methodology of this research is testing hypothesis research. The sample collecting by questionnaire of 150 respondents from Starb...

  18. Insurance, Public Assistance, and Household Flood Risk Reduction: A Comparative Study of Austria, England, and Romania.

    Science.gov (United States)

    Hanger, Susanne; Linnerooth-Bayer, Joanne; Surminski, Swenja; Nenciu-Posner, Cristina; Lorant, Anna; Ionescu, Radu; Patt, Anthony

    2018-04-01

    In light of increasing losses from floods, many researchers and policymakers are looking for ways to encourage flood risk reduction among communities, business, and households. In this study, we investigate risk-reduction behavior at the household level in three European Union Member States with fundamentally different insurance and compensation schemes. We try to understand if and how insurance and public assistance influence private risk-reduction behavior. Data were collected using a telephone survey (n = 1,849) of household decisionmakers in flood-prone areas. We show that insurance overall is positively associated with private risk-reduction behavior. Warranties, premium discounts, and information provision with respect to risk reduction may be an explanation for this positive relationship in the case of structural measures. Public incentives for risk-reduction measures by means of financial and in-kind support, and particularly through the provision of information, are also associated with enhancing risk reduction. In this study, public compensation is not negatively associated with private risk-reduction behavior. This does not disprove such a relationship, but the negative effect may be mitigated by factors related to respondents' capacity to implement measures or social norms that were not included in the analysis. The data suggest that large-scale flood protection infrastructure creates a sense of security that is associated with a lower level of preparedness. Across the board there is ample room to improve both public and private policies to provide effective incentives for household-level risk reduction. © 2017 The Authors Risk Analysis published by Wiley Periodicals, Inc. on behalf of Society for Risk Analysis.

  19. The KnowRISK project: Tools and strategies to reduce non-structural damage

    Science.gov (United States)

    Sousa Oliveira, Carlos; Lopes, Mário; Mota de Sá, Francisco; Amaral Ferreia, Mónica; Candeias, Paulo; Campos Costa, Alfredo; Rupakhety, Rajesh; Meroni, Fabrizio; Azzaro, Raffaele; D'Amico, Salvatore; Langer, Horst; Musacchio, Gemma; Sousa Silva, Delta; Falsaperla, Susanna; Scarfì, Luciano; Tusa, Giuseppina; Tuvé, Tiziana

    2016-04-01

    The project KnowRISK (Know your city, Reduce seISmic risK through non-structural elements) is financed by the European Commission to develop prevention measures that may reduce non-structural damage in urban areas. Pilot areas of the project are within the three European participating countries, namely Portugal, Iceland and Italy. Non-structural components of a building include all those components that are not part of the structural system, more specifically the architectural, mechanical, electrical, and plumbing systems, as well as furniture, fixtures, equipment, and contents. Windows, partitions, granite veneer, piping, ceilings, air conditioning ducts and equipment, elevators, computer and hospital equipment, file cabinets, and retail merchandise are all examples of non-structural components that are vulnerable to earthquake damage. We will use the experience gained during past earthquakes, which struck in particular Iceland, Italy and Portugal (Azores). Securing the non-structural elements improves the safety during an earthquake and saves lives. This paper aims at identifying non-structural seismic protection measures in the pilot areas and to develop a portfolio of good practices for the most common and serious non-structural vulnerabilities. This systematic identification and the portfolio will be achieved through a "cross-knowledge" strategy based on previous researches, evidence of non-structural damage in past earthquakes. Shake table tests of a group of non-structural elements will be performed. These tests will be filmed and, jointly with portfolio, will serve as didactic supporting tools to be used in workshops with building construction stakeholders and in risk communication activities. A Practical Guide for non-structural risk reduction will be specifically prepared for citizens on the basis of the outputs of the project, taking into account the local culture and needs of each participating country.

  20. Low-cost risk reduction strategy for small workplaces: how can we spread good practices?

    Science.gov (United States)

    Kogi, K

    2006-01-01

    Recent advances in health risk reduction approaches are examined based on inter-country networking experiences. A noteworthy progress is the wider application of low-cost improvements to risk reduction particularly in small enterprises and agriculture in both industrially developing and developed countries. This is helped by the readiness of managers and workers to implement these improvements despite many constraints. Typical improvements include mobile racks, simple workstation changes, screening hazards, better welfare facilities and teamwork arrangements. In view of the complex circumstances of work-related health risks, it is important to know whether a low-cost strategy can advance risk reduction practices effectively and what support measures are necessary. It is confirmed that the strategy can overcome related constraints through its advantages. Main advantages lie in (a) the facilitation of improved practices in multiple technical areas, (b) the strengthening of realistic stepwise risk reduction, and (c) the enhanced multiplier effects through training of local trainers. Action-oriented risk assessment tools, such as action checklists and low-cost improvement guides, can encourage risk-reducing measures adjusted to each local situation. It is suggested to spread the low-cost risk reduction strategy for improving small workplaces in diversified settings with the support of these locally tailored tools.

  1. Cost and risk reduction using upfront licensing in Canada. Annex 15

    International Nuclear Information System (INIS)

    Snell, V.G.

    2002-01-01

    The paper summarizes the use of 'up-front' licensing in Canada - how licensing requirements are defined, and met - in advance of a project commitment. The approach to licensing in Canada has allowed flexibility in development of new designs. Since licensing was originally risk-based, and current regulatory policy allows cost-benefit considerations as part of the decision making, risk can be and should be used in novel circumstances as a licensing tool. Since the licensing framework is non-prescriptive, innovative approaches to design can be introduced and dispositioned without changing the legal structure. This flexibility has been used in several up-front licensing reviews: a small urban heating reactor, repeat CANDU 6 generating station units, and the single unit CANDU 9 generating station. In the future we expect to apply it to advanced designs, as an essential part of risk reduction and customer confidence in the product. The important lessons learned in Canada include: Up-front licensing is essential to reduce the risk of licensing-related delays once a project has been committed. It requires a significant investment in time and effort from both the designer and the regulator; The most effective scope for up-front licensing is for the regulator to thoroughly assess novel concepts, test the design against changed domestic requirements, and follow-up on known difficult areas; and for the designer to ensure foreign requirements are incorporated. There is little benefit in certifying the design in detail; Although it would be satisfying to have legally-binding certification, in the end there can be no legal obligation on the regulator, and agreement is pursued on the basis of good faith that the regulator will not make arbitrary decisions and that the designer will meet agreed targets or requirements; In almost all circumstances, issues will arise that are beyond the current 'rules', however expressed. Rather than rushing to create new rules, one reaches a

  2. Effect of smoking reduction on lung cancer risk

    DEFF Research Database (Denmark)

    Godtfredsen, Nina S; Prescott, Eva; Osler, Merete

    2005-01-01

    Many smokers are unable or unwilling to completely quit smoking. A proposed means of harm reduction is to reduce the number of cigarettes smoked per day. However, it is not clear whether this strategy decreases the risk for tobacco-related diseases....

  3. High-school software development project helps increasing students' awareness of geo-hydrological hazards and their risks

    Science.gov (United States)

    Marchesini, Ivan; Rossi, Mauro; Balducci, Vinicio; Salvati, Paola; Guzzetti, Fausto; Bianchini, Andrea; Grzeleswki, Emanuell; Canonico, Andrea; Coccia, Rita; Fiorucci, Gianni Mario; Gobbi, Francesca; Ciuchetti, Monica

    2015-04-01

    In Italy, inundation and landslides are widespread phenomena that impact the population and cause significant economic damage to private and public properties. The perception of the risk posed by these natural geo-hydrological hazards varies geographically and in time. The variation in the perception of the risks has negative consequences on risk management, and limits the adoption of effective risk reduction strategies. We maintain that targeted education can foster the understanding of geo-hydrological hazards, improving their perception and the awareness of the associated risk. Collaboration of a research center experienced in geo-hydrological hazards and risks (CNR IRPI, Perugia) and a high school (ITIS Alessandro Volta, Perugia) has resulted in the design and execution of a project aimed at improving the perception of geo-hydrological risks in high school students and teachers through software development. In the two-year project, students, high school teachers and research scientists have jointly developed software broadly related to landslide and flood hazards. User requirements and system specifications were decided to facilitate the distribution and use of the software among students and their peers. This allowed a wider distribution of the project results. We discuss two prototype software developed by the high school students, including an application of augmented reality for improved dissemination of information of landslides and floods with human consequences in Italy, and a crowd science application to allow students (and others, including their families and friends) to collect information on landslide and flood occurrence exploiting modern mobile devices. This information can prove important e.g., for the validation of landslide forecasting models.

  4. Introduction to cost-effectiveness analysis of risk reduction measures in energy systems

    International Nuclear Information System (INIS)

    1986-07-01

    The aim of this report is to introduce readers to methods of cost-effectiveness analysis and their application in risk reduction, especially in connection with the energy-producing industries. The background to the assessment of risk and the problems in estimating it quantitatively are outlined. The methodology of cost-effectiveness analysis is then described, particular attention being given to the way in which results are derived and the overall use that can be made of them. This is followed by a discussion of quantitative applications and an outline of the methods that may be used to derive estimates both of risk and the cost of reducing it. The use of cost-effectiveness analysis is illustrated in an appendix, which gives as a worked example a case study on the reduction of public risk associated with radioactive releases during normal operation of a PWR. After drawing some general conclusions the report recommends that such analyses should normally be used as an aid to risk management whenever several alternative risk reduction measures are under consideration

  5. Assessment of aircraft risk reduction at Pantex Plant

    International Nuclear Information System (INIS)

    Lin, Y.T.; Hedtke, R.; Fike, D.; Diniz, J.

    1996-01-01

    The possibility of an aircraft crashing into the Department of Energy's (DOE) Pantex plant facility has been of concern in risk assessments. In response to public concerns, and in an effort to reduce risks associated with overflights of Pantex, several changes to navigational aids at Amarillo International Airport have been implemented. For over one year, a radar airspace monitor and recording system has been connected to the airport surveillance radar at Amarillo to record the flight paths, aircraft types, and traffic density of aircraft in the vicinity of the Pantex plant. The data has provided a better understanding of the overflight risk at Pantex as well as a means to measure the effectiveness of risk reduction efforts

  6. Reviews on current carbon emission reduction technologies and projects and their feasibilities on ships

    Science.gov (United States)

    Wang, Haibin; Zhou, Peilin; Wang, Zhongcheng

    2017-06-01

    Concern about global climate change is growing, and many projects and researchers are committed to reducing greenhouse gases from all possible sources. International Maritime (IMO) has set a target of 20% CO2 reduction from shipping by 2020 and also presented a series of carbon emission reduction methods, which are known as Energy Efficiency Design Index (EEDI) and Energy Efficiency Operation Indicator (EEOI). Reviews on carbon emission reduction from all industries indicate that, Carbon Capture and Storage (CCS) is an excellent solution to global warming. In this paper, a comprehensive literature review of EEDI and EEOI and CCS is conducted and involves reviewing current policies, introducing common technologies, and considering their feasibilities for marine activities, mainly shipping. Current projects are also presented in this paper, thereby illustrating that carbon emission reduction has been the subject of attention from all over the world. Two case ship studies indicate the economic feasibility of carbon emission reduction and provide a guide for CCS system application and practical installation on ships.

  7. The KnowRISK project - Know your city, Reduce seISmic risK through non-structural elements

    Science.gov (United States)

    Sousa Oliveria, Carlos; Amaral Ferreira, Mónica; Lopez, Mário; Sousa Silva, Delta; Musacchio, Gemma; Rupakhety, Rajesh; Falsaperla, Susanna; Meroni, Fabrizio; Langer, Horst

    2016-04-01

    Historically, there is a tendency to focus on seismic structural performance of buildings, neglecting the potential for damage of non-structural elements. In particular, non-structural elements of buildings are their architectural parts (i.e. partitions, ceilings, cladding), electrical and mechanical components (i.e., distribution panels, piping, plumbing), and contents (e.g., furniture, bookcases, computers and desktop equipment). Damage of these elements often contributes significantly to earthquake impacts. In the 1999 Izmit Earthquake, Turkey, 50% of the injuries and 3% of human losses were caused by non-structural failures. In the 2010-2011 Christchurch Earthquakes (New Zealand), 40% of building damage was induced by non-structural malfunctions. Around 70%-85% of construction cost goes into these elements, and their damage can strongly influence the ability of communities to cope with and recover from earthquakes. The project Know your city, Reduce seISmic risK through non-structural elements (KnowRISK) aims at facilitating local communities' access to expert knowledge on non-structural seismic protection solutions. The project will study seismic scenarios critical for non-structural damage, produce a portfolio of non-structural protection measures and investigate the level of awareness in specific communities. We will implement risk communication strategies that will take into account the social and cultural background and a participatory approach to raise awareness in local communities. The paradox between the progress of scientific knowledge and the ongoing increase of losses from natural disasters worldwide is a well-identified gap in the UN Hyogo Framework for Action 2005-2015, in which one of the main priorities is the investment on "knowledge use, innovation and education to build a culture of safety and resilience". The KnowRISK is well aligned with these priorities and will contribute to participatory action aimed at: i) transferring expert knowledge

  8. Northern California CO2 Reduction Project

    Energy Technology Data Exchange (ETDEWEB)

    Hymes, Edward [C6 Resources LLC, Houston, TX (United States)

    2010-06-16

    C6 Resources LLC, a wholly owned subsidiary of Shell Oil Company, worked with the US Department of Energy (DOE) under a Cooperative Agreement to develop the Northern California CO2 Reduction Project. The objective of the Project is to demonstrate the viability of using Carbon Capture and Sequestration (CCS) to reduce existing greenhouse gas emissions from industrial sources on a large-scale. The Project will capture more than 700,000 metric tonnes of CO2 per year, which is currently being vented to the atmosphere from the Shell Martinez Refinery in Contra Costa County. The CO2 will be compressed and dehydrated at the refinery and then transported via pipeline to a sequestration site in a rural area in neighboring Solano County. The CO2 will be sequestered into a deep saline formation (more than two miles underground) and will be monitored to assure secure, long-term containment. The pipeline will be designed to carry as much as 1,400,000 metric tonnes of CO2 per year, so additional capacity will be available to accommodate CO2 captured from other industrial sources. The Project is expected to begin operation in 2015. The Project has two distinct phases. The overall objective of Phase 1 was to develop a fully definitive design basis for the Project. The Cooperative Agreement with the DOE provided cost sharing for Phase 1 and the opportunity to apply for additional DOE cost sharing for Phase 2, comprising the design, construction and operation of the Project. Phase 1 has been completed. DOE co-funding is provided by the American Recovery and Reinvestment Act (ARRA) of 2009. As prescribed by ARRA, the Project will stimulate the local economy by creating manufacturing, transportation, construction, operations, and management jobs while addressing the need to reduce greenhouse gas emissions at an accelerated pace. The Project, which will also assist in meeting the CO2 reduction requirements set

  9. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  10. The Impact of Variable Wind Shear Coefficients on Risk Reduction of Wind Energy Projects.

    Science.gov (United States)

    Corscadden, Kenneth W; Thomson, Allan; Yoonesi, Behrang; McNutt, Josiah

    2016-01-01

    Estimation of wind speed at proposed hub heights is typically achieved using a wind shear exponent or wind shear coefficient (WSC), variation in wind speed as a function of height. The WSC is subject to temporal variation at low and high frequencies, ranging from diurnal and seasonal variations to disturbance caused by weather patterns; however, in many cases, it is assumed that the WSC remains constant. This assumption creates significant error in resource assessment, increasing uncertainty in projects and potentially significantly impacting the ability to control gird connected wind generators. This paper contributes to the body of knowledge relating to the evaluation and assessment of wind speed, with particular emphasis on the development of techniques to improve the accuracy of estimated wind speed above measurement height. It presents an evaluation of the use of a variable wind shear coefficient methodology based on a distribution of wind shear coefficients which have been implemented in real time. The results indicate that a VWSC provides a more accurate estimate of wind at hub height, ranging from 41% to 4% reduction in root mean squared error (RMSE) between predicted and actual wind speeds when using a variable wind shear coefficient at heights ranging from 33% to 100% above the highest actual wind measurement.

  11. Greenhouse Emission Reductions and Natural Gas Vehicles: A Resource Guide on Technology Options and Project Development

    Energy Technology Data Exchange (ETDEWEB)

    Orestes Anastasia; NAncy Checklick; Vivianne Couts; Julie Doherty; Jette Findsen; Laura Gehlin; Josh Radoff

    2002-09-01

    Accurate and verifiable emission reductions are a function of the degree of transparency and stringency of the protocols employed in documenting project- or program-associated emissions reductions. The purpose of this guide is to provide a background for law and policy makers, urban planners, and project developers working with the many Greenhouse Gas (GHG) emission reduction programs throughout the world to quantify and/or evaluate the GHG impacts of Natural Gas Vehicle (NGVs). In order to evaluate the GHG benefits and/or penalties of NGV projects, it is necessary to first gain a fundamental understanding of the technology employed and the operating characteristics of these vehicles, especially with regard to the manner in which they compare to similar conventional gasoline or diesel vehicles. Therefore, the first two sections of this paper explain the basic technology and functionality of NGVs, but focus on evaluating the models that are currently on the market with their similar conventional counterparts, including characteristics such as cost, performance, efficiency, environmental attributes, and range. Since the increased use of NGVs, along with Alternative Fuel Vehicle (AFVs) in general, represents a public good with many social benefits at the local, national, and global levels, NGVs often receive significant attention in the form of legislative and programmatic support. Some states mandate the use of NGVs, while others provide financial incentives to promote their procurement and use. Furthermore, Federal legislation in the form of tax incentives or procurement requirements can have a significant impact on the NGV market. In order to implement effective legislation or programs, it is vital to have an understanding of the different programs and activities that already exist so that a new project focusing on GHG emission reduction can successfully interact with and build on the experience and lessons learned of those that preceded it. Finally, most programs

  12. Valuing Drinking Water Risk Reductions Using the Contingent Valuation Method: A Methodological Study of Risks from THM and Giardia (1986)

    Science.gov (United States)

    This study develops contingent valuation methods for measuring the benefits of mortality and morbidity drinking water risk reductions. The major effort was devoted to developing and testing a survey instrument to value low-level risk reductions.

  13. Cancer risk in aluminum reduction plant workers (Canada)

    Energy Technology Data Exchange (ETDEWEB)

    Spinelli, J.J.; Demers, P.A.; Le, N.D.; Friesen, M.D.; Lorenzi, M.F.; Fang, R.; Gallagher, R.P. [British Columbia Cancer Agency, Vancouver, BC (Canada)

    2006-09-15

    A 14-year update to a previously published historical cohort study of aluminum reduction plant workers was conducted. All men with three or more years at an aluminum reduction plant in British Columbia (BC), Canada between the years 1954 and 1997 were included; a total of 6,423 workers. A total of 662 men were diagnosed with cancer, representing a 400% increase from the original study. Standardized mortality and incidence ratios were used to compare the cancer mortality and incidence of the cohort to that of the BC population. Poisson regression was used to examine risk by cumulative exposure to coal tar pitch volatiles (CTPV) measured as benzene soluble materials (BSM) and benzo(a)pyrene (BaP). The risk for bladder cancer was related to cumulative exposure to CTPV measured as BSM and BaP (p trends < 0.001), and the risk for stomach cancer was related to exposure measured by BaP (p trend BaP < 0.05). The risks for lung cancer (p trend < 0.001), non-Hodgkin lymphoma (p trend < 0.001), and kidney cancer (p trend < 0.01) also increased with increasing exposure, although the overall rates were similar to that of the general population. Analysis of the joint effect of smoking and CTPV exposure on cancer showed the observed dose-response relationships to be independent of smoking.

  14. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    Science.gov (United States)

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  15. Evaluation of an HIV-risk reduction programme for first-year ...

    African Journals Online (AJOL)

    Results indicated that HIV-related knowledge; condom knowledge and risk perception were enhanced by the HIV- related risk reduction programme. However, there is a need for improvement, especially with regard to attitudes towards condoms since some students still had negative attitudes even after the intervention ...

  16. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  17. Financial risks in major investment projects

    International Nuclear Information System (INIS)

    Segelod, Esbjoern

    2006-01-01

    We have probably all read about large projects which proved far more expensive than anticipated, projects such as the Channel tunnel which cost 80% more than planned, and the oil pipeline between the oil field in Prudhoe Bay in Northern Alaska and the oil terminal in Vadez in the south which overran its budget by 1,000%. The purpose of this paper is to summarise our knowledge of the risk of cost escalation. Which projects are more likely than others to be hit by cost escalation, and why

  18. POTENTIAL HEALTH RISK REDUCTION ARISING FROM REDUCED MERCURY EMISSIONS FROM COAL FIRED POWER PLANTS.

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, T. M.; Lipfert, F. W.; Morris, S. C.; Moskowitz, P. D.

    2001-09-01

    The U.S. Environmental Protection Agency (EPA) has announced plans to regulate mercury (Hg) emissions from coal-fired power plants. EPA has not prepared a quantitative assessment of the reduction in risk that could be achieved through reduction in coal plant emissions of Hg. To address this issue, Brookhaven National Laboratory (BNL) with support from the U.S. Department of Energy Office of Fossil Energy (DOE FE) prepared a quantitative assessment of the reduction in human health risk that could be achieved through reduction in coal plant emissions of Hg. The primary pathway for Hg exposure is through consumption of fish. The most susceptible population to Hg exposure is the fetus. Therefore the risk assessment focused on consumption of fish by women of child-bearing age. Dose response factors were generated from studies on loss of cognitive abilities (language skills, motor skills, etc.) by young children whose mothers consumed large amounts of fish with high Hg levels. Population risks were estimated for the general population in three regions of the country, (the Midwest, Northeast, and Southeast) that were identified by EPA as being heavily impacted by coal emissions. Three scenarios for reducing Hg emissions from coal plants were considered: (1) A base case using current conditions; (2) A 50% reduction; and, (3) A 90% reduction. These reductions in emissions were assumed to translate linearly into a reduction in fish Hg levels of 8.6% and 15.5%, respectively. Population risk estimates were also calculated for two subsistence fisher populations. These groups of people consume substantially more fish than the general public and, depending on location, the fish may contain higher Hg levels than average. Risk estimates for these groups were calculated for the three Hg levels used for the general population analyses. Analysis shows that the general population risks for exposure of the fetus to Hg are small. Estimated risks under current conditions (i.e., no

  19. Risk Management Improvement of Engineering Projects in Woodworking Industry

    Directory of Open Access Journals (Sweden)

    Simona Bartkutė

    2014-02-01

    Full Text Available Risk is a complex phenomenon that has physical, monetary, cultural and social dimensions. Every company wants tosave money, time, increase quality, optimise manufacturing, but each factor may involve different risks with different influenceto company, its reputation. The aim of the research is to find better risk management improvement decisions, using techniquesthat could help to reduce risk impact in wood-based nonstandard production with shorter project time, smoother design process,lower costs, better project coordination, increased ability to manage problems, technical solutions.

  20. EC FP6 Siberia-focused Enviro-RISKS Project and its Outcomes

    Science.gov (United States)

    Baklanov, A. A.; Gordov, E. P.

    2009-04-01

    The FP6 Project "Man-induced Environmental Risks: Monitoring, Management and Remediation of Man-made Changes in Siberia" (Enviro-RISKS) strategic objective is to facilitate elaboration of solid scientific background and understanding of man-made associated environmental risks, their influence on all aspects of regional environment and optimal ways for it remediation by means of coordinated initiatives of a range of relevant RTD projects as well as to achieve their improved integration thus giving the projects additional synergy in current activities and potential for practical applications. List of Partners includes 3 leading European research organizations, 6 leading Russian research organizations (5 - located in Siberia) and 1 organization from Kazakhstan. Additionally several Russian and European research organizations joined to the Project as Associated Partners. Scientific background and foundation for the project performance is formed by a number of different levels RTD projects carried out by Partners and devoted to near all aspects of the theme. The set comprise coordinated/performed by partners EC funded thematic international projects, Russian national projects and other projects performed by NIS partners. Project outcomes include, in particular, development and support of the bilingual Enviro-RISKS web portal (http://risks.scert.ru/) as the major tool for disseminations of environmental information and project results; achieved level of development of Siberia Integrated Regional Study (SIRS, http://sirs.scert.ru/), which is the Siberia-focused NEESPI Environmental Mega-Project ongoing under the auspices of the Siberian Branch of the Russian Academy of Sciences. The main Project outcome are Memorandum on the state of the art of environmental RTD activity in Siberia and Recommendations on future environmental RTD activity in Siberia elaborated by four Working Experts Groups working in most important for Siberia Thematic Focuses. Three Thematic Focuses

  1. Quantitative Decision Making Model for Carbon Reduction in Road Construction Projects Using Green Technologies

    Directory of Open Access Journals (Sweden)

    Woosik Jang

    2015-08-01

    Full Text Available Numerous countries have established policies for reducing greenhouse gas emissions and have suggested goals pertaining to these reductions. To reach the target reduction amounts, studies on the reduction of carbon emissions have been conducted with regard to all stages and processes in construction projects. According to a study on carbon emissions, the carbon emissions generated during the construction stage of road projects account for approximately 76 to 86% of the total carbon emissions, far exceeding the other stages, such as maintenance or demolition. Therefore, this study aims to develop a quantitative decision making model that supports the application of green technologies (GTs to reduce carbon emissions during the construction stage of road construction projects. First, the authors selected environmental soundness, economic feasibility and constructability as the key assessment indices for evaluating 20 GTs. Second, a fuzzy set/qualitative comparative analysis (FS/QCA was used to establish an objective decision-making model for the assessment of both the quantitative and qualitative characteristics of the key indices. To support the developed model, an expert survey was performed to assess the applicability of each GT from a practical perspective, which was verified with a case study using two additional GTs. The proposed model is expected to support practitioners in the application of suitable GTs to road projects and reduce carbon emissions, resulting in better decision making during road construction projects.

  2. Earth observation for disaster risk reduction in Pakistan

    International Nuclear Information System (INIS)

    Rafiq, L.

    2012-01-01

    This thesis investigates the role of Earth Observation (EO) for disaster risk reduction for Pakistan. It demonstrates that significant improvements are possible through the utilization of EO data for natural disaster risk reduction activities in Pakistan. In this thesis, a multi hazard approach is proposed in order to identify vulnerability and risk at district level in Pakistan. In particular, a methodology for ranking hazards, vulnerabilities and risks based on Delphi methods is developed. This method is implemented and the results are mapped for four selected hazards i.e., earthquakes, floods, cyclones and droughts. Based on the final risk rankings, the potential of EO is explored with a focus on vulnerability assessment through detailed analysis of two case studies i.e.; Flood and Cyclone/Tsunami. The study also reviews and evaluates the institutional framework of the National Disaster Management Authority of Pakistan in order to identify existing gaps and address them in view of modern technology being used globally. Results reveal that these gaps are mainly related to policies, coordination and communication of different stakeholders at the national level. The work also reviews the available Early Warning System (EWS) in Pakistan and particularly its usage during disasters. Within the context of EWS, multi-sensor satellite data have been utilized for the analysis of structure of an Arabian Sea tropical Cyclone. Results of this focal study provide useful information for operational analysis and forecasting as well as for designing disaster mitigation measures. This information may also play a major role in the development of cyclone warning strategies in the future. (author)

  3. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  4. Assessment of reduction in perception of nuclear risk related to perception of environmental risk

    International Nuclear Information System (INIS)

    Boemer, Veronica Araujo; Aquino, Afonso Rodrigues de

    2009-01-01

    This work presents a bibliographic research accomplished to evaluate the matter of reduction in risk perception, on people in general, that nuclear energy can show, for generation of electric power, face to perception of risk associated to environmental questions, as the global warming, from greenhouse effect, addressing the matter to the relevance of public acceptance for the development of new technologies. (author)

  5. The Role and the Effects of Risk Management in IT Projects Success

    Directory of Open Access Journals (Sweden)

    Otniel DIDRAGA

    2013-01-01

    Full Text Available The success of IT projects is influenced by risk and risk management according to the existing project management literature. The paper emphasizes the role of risk management and its contribution to projects success in the existing literature. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2012 from the main IT project management journals and publications. The results are that risk management is a very important component of the project management process and it is assumed implicitly to work in favour of project success. We also performed a quantitative analysis of how risk management processes affect the subjective and objective performance of IT projects in Romanian IT companies.

  6. Semantic Mediation Tool for Risk Reduction, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This project focuses on providing an infrastructure to aid the building of ontologies from existing NASA applications, in a manner that leads to long-term risk...

  7. Quantitative Risk reduction estimation Tool For Control Systems, Suggested Approach and Research Needs

    Energy Technology Data Exchange (ETDEWEB)

    Miles McQueen; Wayne Boyer; Mark Flynn; Sam Alessi

    2006-03-01

    For the past year we have applied a variety of risk assessment technologies to evaluate the risk to critical infrastructure from cyber attacks on control systems. More recently, we identified the need for a stand alone control system risk reduction estimation tool to provide owners and operators of control systems with a more useable, reliable, and credible method for managing the risks from cyber attack. Risk is defined as the probability of a successful attack times the value of the resulting loss, typically measured in lives and dollars. Qualitative and ad hoc techniques for measuring risk do not provide sufficient support for cost benefit analyses associated with cyber security mitigation actions. To address the need for better quantitative risk reduction models we surveyed previous quantitative risk assessment research; evaluated currently available tools; developed new quantitative techniques [17] [18]; implemented a prototype analysis tool to demonstrate how such a tool might be used; used the prototype to test a variety of underlying risk calculational engines (e.g. attack tree, attack graph); and identified technical and research needs. We concluded that significant gaps still exist and difficult research problems remain for quantitatively assessing the risk to control system components and networks, but that a useable quantitative risk reduction estimation tool is not beyond reach.

  8. Renewable fuels: Policy effectiveness and project risk

    International Nuclear Information System (INIS)

    Leach, Andrew; Doucet, Joseph; Nickel, Trevor

    2011-01-01

    This paper examines the impact of government policy on the risk profile of a small ethanol production facility. We derive four key results from a simulation model. First, we show that commodity price risk may discourage investment in a project, despite a positive expected rate of return. Second, we show that political uncertainty may have significant impacts on the risk profile of a project. Next, we show that using only production subsidies to attract investors is expensive, since the financial assistance is paid regardless of whether the plant is operating under positive or negative financial conditions. Finally, we show that a capital grant provides a valuable complement to a subsidy, because the grant reduces the amount of value investors must put at risk, and increases their leverage thereby enhancing returns, while the subsidy mitigates commodity price risk. Our results show that compared to a subsidy-only approach, a grant and subsidy combination provides an investment environment with similar downside protection and expected returns for less than 60% of the cost. Further, we show that the two policy tools combined yield a superior investment environment to that created by an equivalent or greater total investment deployed entirely in either of the policy tools without the other. - Research highlights: → We find that government policy may increase both project returns and risk. → We find a policy of capital grants combined with an output price support to be preferred. → Price supports alone will tend to reward those plants which need them the least.

  9. Outreach nurses in Harm Reduction projects: improving acceptability and availability of medical care to drug users

    Directory of Open Access Journals (Sweden)

    Dvinskykh, Natalya

    2012-07-01

    Full Text Available BACKGROUND: Injection drug users (IDU remain one of the most vulnerable population segments in Ukraine, with HIV prevalence up to 22% among this group. At the same time, drug users lack access to basic health care and reportedly face stigma and discrimination from medical workers. Harm reduction projects in Ukraine partially address this problem by providing regular HIV and STI testing for their clients, and by referring them to medical institutions, where IDU can get free treatment for STI, TB, and ARV therapy for HIV. However, issues of acceptability and availability of medical care for drug users are far from being resolved. METHODS: During 2011, the new approach of ‘outreach nurses’ was piloted by All Ukrainian Harm Reduction Association (UHRA with support from ICF “International HIV/AIDS Alliance in Ukraine”. The aim of the project was to bring medical services closer to IDU by integrating work of medical professionals into a comprehensive package of Harm Reduction project services. The project employed fifteen nurses from five regions of Ukraine. During the project, nurses provided basic medical services, consultations on health improvement issues and referrals. The services were provided at the places convenient for clients: syringe exchange points, community centers, mobile clinics, and at home. RESULTS: The services of the project were well accepted by the clients. From June till December 2011 the project reached 1703 unique clients, with a total of 4525 visits (300 visits per nurse on average. For comparison, in the HR projects that employed surgeons, on average there were 58 visits per doctor (from 30 to 93 during the same period of time. CONCLUSIONS: To improve access to medical care for the drug using population Harm Reduction projects should consider including work of ‘outreach nurses’ to the package of services they provide.

  10. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  11. Development of a module for Cost-Benefit analysis of risk reduction measures for natural hazards for the CHANGES-SDSS platform

    Science.gov (United States)

    Berlin, Julian; Bogaard, Thom; Van Westen, Cees; Bakker, Wim; Mostert, Eric; Dopheide, Emile

    2014-05-01

    Cost benefit analysis (CBA) is a well know method used widely for the assessment of investments either in the private and public sector. In the context of risk mitigation and the evaluation of risk reduction alternatives for natural hazards its use is very important to evaluate the effectiveness of such efforts in terms of avoided monetary losses. However the current method has some disadvantages related to the spatial distribution of the costs and benefits, the geographical distribution of the avoided damage and losses, the variation in areas that are benefited in terms of invested money and avoided monetary risk. Decision-makers are often interested in how the costs and benefits are distributed among different administrative units of a large area or region, so they will be able to compare and analyse the cost and benefits per administrative unit as a result of the implementation of the risk reduction projects. In this work we first examined the Cost benefit procedure for natural hazards, how the costs are assessed for several structural and non-structural risk reduction alternatives, we also examined the current problems of the method such as the inclusion of cultural and social considerations that are complex to monetize , the problem of discounting future values using a defined interest rate and the spatial distribution of cost and benefits. We also examined the additional benefits and the indirect costs associated with the implementation of the risk reduction alternatives such as the cost of having a ugly landscape (also called negative benefits). In the last part we examined the current tools and software used in natural hazards assessment with support to conduct CBA and we propose design considerations for the implementation of the CBA module for the CHANGES-SDSS Platform an initiative of the ongoing 7th Framework Programme "CHANGES of the European commission. Keywords: Risk management, Economics of risk mitigation, EU Flood Directive, resilience, prevention

  12. Governance of disaster risk reduction in Cameroon: The need to empower local government

    Directory of Open Access Journals (Sweden)

    Henry N. Bang

    2013-02-01

    Full Text Available The impact of natural hazards and/or disasters in Cameroon continues to hit local communities hardest, but local government lacks the ability to manage disaster risks adequately. This is partly due to the fact that the necessity to mainstream disaster risk reduction into local governance and development practices is not yet an underlying principle of Cameroon’s disaster management framework. Using empirical and secondary data, this paper analyses the governance of disaster risks in Cameroon with particular focus on the challenges local government faces in implementing disaster risk reduction strategies. The hypothesis is that the governance of disaster risks is too centralised at the national level, with huge implications for the effective governance of disaster risks at the local level. Although Cameroon has reinvigorated efforts to address growing disaster risks in a proactive way, it is argued that the practical actions are more reactive than proactive in nature. The overall aim is to explore the challenges and opportunities that local government has in the governance of disaster risks. Based on the findings from this research, policy recommendations are suggested on ways to mainstream disaster risk reduction strategies into local governance, and advance understanding and practice in the local governance of disaster risks in the country.

  13. Economic Valuation of Contamination Risks and its Effect on Site Investigations

    International Nuclear Information System (INIS)

    Back, Paer-Erik; Rosen, Lars

    2006-01-01

    Risk management is an important part of contaminated land projects and different types of risks must be considered both during investigation and remediation phases, e.g. human health risks, ecological risks, risks for workers during remediation, and project risks. The latter can be risks associated with e.g. time delays due to technical or juridical problems, or failure of remediation techniques. To provide cost-efficient management of remediation projects, there is an incentive for economic valuation of the risk reduction provided by further investigation or remedial actions. The purpose of this paper is (1) to describe problems and possibilities with economic valuation of risk reductions, and (2) to illustrate how different valuation perspectives affect the extent of investigations. A decision analysis model is presented for integrating the valuation of health, ecological, and project risks

  14. Economic Valuation of Contamination Risks and its Effect on Site Investigations

    Energy Technology Data Exchange (ETDEWEB)

    Back, Paer-Erik; Rosen, Lars [Chalmers Univ. of Technology, Goeteborg (Sweden). Dept. of Civil Engineering

    2006-09-15

    Risk management is an important part of contaminated land projects and different types of risks must be considered both during investigation and remediation phases, e.g. human health risks, ecological risks, risks for workers during remediation, and project risks. The latter can be risks associated with e.g. time delays due to technical or juridical problems, or failure of remediation techniques. To provide cost-efficient management of remediation projects, there is an incentive for economic valuation of the risk reduction provided by further investigation or remedial actions. The purpose of this paper is (1) to describe problems and possibilities with economic valuation of risk reductions, and (2) to illustrate how different valuation perspectives affect the extent of investigations. A decision analysis model is presented for integrating the valuation of health, ecological, and project risks.

  15. Risk identification for PPP waste-to-energy incineration projects in China

    International Nuclear Information System (INIS)

    Song, Jinbo; Song, Danrong; Zhang, Xueqing; Sun, Yan

    2013-01-01

    Municipal solid waste (MSW) is regarded as a renewable energy source. In China, the sharp increase of MSW has precipitated the rapid growth of waste-to-energy (WTE) incineration plants. Private capital has been getting into the WTE incineration industry through the public–private partnership (PPP) arrangement. Due to the large construction cost and the long concession period commonly associated with this arrangement, a number of failures have emerged in PPP WTE incineration projects. The aim of this paper is to investigate the key risks of PPP WTE incineration projects in China and study the strategies for managing these risks by drawing experience and learning lessons from these projects. First, we analyzed the MSW management practices, relevant legislations and policies, and the development of PPP WTE incineration projects in China. Second, we identified ten key risks through interviews, surveys and visits to some selected projects, and provided detailed analysis of these risks. Lastly, we developed response strategies for these risks from the perspectives of both public and private sectors. - Highlights: • We analyze MSW management practices, relevant legislations and policies in China. • Through case study on PPP WTE incineration projects, ten key risks are identified. • Response strategies for key risks are developed

  16. Opportunities and criticisms of voluntary emission reduction projects developed by Public Administrations: Analysis of 143 case studies implemented in Italy

    International Nuclear Information System (INIS)

    Gallo, Michela; Del Borghi, Adriana; Strazza, Carlo; Parodi, Lara; Arcioni, Livia; Proietti, Stefania

    2016-01-01

    Highlights: • 143 voluntary emission reduction projects have been analysed. • The projects belong to renewable energy, energy efficiency and transport sectors. • Voluntary emission reduction standards and methodologies have been applied. • The paper identified the main criticisms for each sector. • Energy efficiency projects are the most promising for public entities. - Abstract: The United Nations Framework Convention on Climate Change (UNFCCC) sets an overall framework for intergovernmental efforts to tackle the challenge posed by climate change. Besides the “flexibility mechanisms” defined by the Kyoto Protocol to lower the overall costs of achieving their emissions targets, The Voluntary Green House Gases (GHG) reduction projects can have a lead role in GHG reduction in “non Emissions Trading System ETS sectors”. Nowadays, the voluntary market is characterised by critical aspects, such as fragmentation, lack of accounting, monitoring and validation rules that have led to the low spread of voluntary emission reduction projects developed by local authorities in the European Union despite their high potentiality. The aim of this paper is to test the applicability of voluntary emission reduction projects in the public sector following a homogeneous and consistent pattern. A research has been performed at local level on 143 voluntary emission reduction projects implemented by Public Administrations in Northern and Central Italy in renewable energy, energy efficiency and transport sectors. The applicable standards and methodologies have been checked and the case studies have been analysed though a three-step process: Preliminary additionality assessment; Projects selection; Validation of the selected project. The assessment shows that energy efficiency projects, once overcoming additionality issues, are the most promising for public entities while renewable energy and transport projects resulted to be mainly affected by double counting problems and

  17. The social value of mortality risk reduction: VSL versus the social welfare function approach.

    Science.gov (United States)

    Adler, Matthew D; Hammitt, James K; Treich, Nicolas

    2014-05-01

    We examine how different welfarist frameworks evaluate the social value of mortality risk reduction. These frameworks include classical, distributively unweighted cost-benefit analysis--i.e., the "value per statistical life" (VSL) approach-and various social welfare functions (SWFs). The SWFs are either utilitarian or prioritarian, applied to policy choice under risk in either an "ex post" or "ex ante" manner. We examine the conditions on individual utility and on the SWF under which these frameworks display sensitivity to wealth and to baseline risk. Moreover, we discuss whether these frameworks satisfy related properties that have received some attention in the literature, namely equal value of risk reduction, preference for risk equity, and catastrophe aversion. We show that the particular manner in which VSL ranks risk-reduction measures is not necessarily shared by other welfarist frameworks. Copyright © 2014 Elsevier B.V. All rights reserved.

  18. Biodiesel from Specified Risk Material Tallow: An Appraisal of TSE Risks and their Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Baribeau, A; Bradley, R; Brown, P; Goodwin, J; Kihm, U; Lotero, E; O' Connor, D; Schuppers, M; Taylor, D

    2007-03-15

    This document presents a systematic survey of current knowledge about the risk to human and animal health posed by the processing of tissues from animals potentially infected with transmissible spongiform encephalopathy (TSE, or 'prion disease') into biodiesel. It is organised into an introductory background section on TSE, followed by chapters treating the sequential stages of biodiesel production. The principal conclusions are: Animal tissue sources. The choice of geographic origin, based on published scientific evaluations of the risk of TSE to be present in a given country, can largely reduce or even eliminate the entry of contaminated tissue into the biodiesel feedstock. Further safeguards can be provided by selection of animal species not susceptible to TSE, and of tissues without any detectable infectivity even in susceptible species. None of these measures, however, would be applied to the biodiesel projects under consideration, which have the specific aim of using animals and tissues (including specified risk material, or SRM) considered to have sufficient potential risk to be unacceptable for use in food, feed, fertilisers, or pharmaceuticals (including biologicals and medical devices) and therefore are designated for other approved uses, or destruction. Tissue rendering to produce tallow. Experiments to test the survival of TSE infectivity in the products of rendering failed to detect any infectivity in the crude tallow fraction, even following processing methods that allowed survival of infectivity in the co-produced meat and bone meal fraction. It is therefore extremely unlikely that pure tallow originating from diseased animals would be infectious; however, lower grade tallow might contain infectious impurities. A requirement that tallow derived from SRM for use in biodiesel contain no detectable protein would reduce this possibility. Transesterification of tallow to biodiesel. Several steps in the manufacturing process have at least the potential to

  19. Biodiesel from Specified Risk Material Tallow: An Appraisal of TSE Risks and their Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Baribeau, A.; Bradley, R.; Brown, P.; Goodwin, J.; Kihm, U.; Lotero, E.; O' Connor, D.; Schuppers, M.; Taylor, D.

    2007-03-15

    This document presents a systematic survey of current knowledge about the risk to human and animal health posed by the processing of tissues from animals potentially infected with transmissible spongiform encephalopathy (TSE, or 'prion disease') into biodiesel. It is organised into an introductory background section on TSE, followed by chapters treating the sequential stages of biodiesel production. The principal conclusions are: Animal tissue sources. The choice of geographic origin, based on published scientific evaluations of the risk of TSE to be present in a given country, can largely reduce or even eliminate the entry of contaminated tissue into the biodiesel feedstock. Further safeguards can be provided by selection of animal species not susceptible to TSE, and of tissues without any detectable infectivity even in susceptible species. None of these measures, however, would be applied to the biodiesel projects under consideration, which have the specific aim of using animals and tissues (including specified risk material, or SRM) considered to have sufficient potential risk to be unacceptable for use in food, feed, fertilisers, or pharmaceuticals (including biologicals and medical devices) and therefore are designated for other approved uses, or destruction. Tissue rendering to produce tallow. Experiments to test the survival of TSE infectivity in the products of rendering failed to detect any infectivity in the crude tallow fraction, even following processing methods that allowed survival of infectivity in the co-produced meat and bone meal fraction. It is therefore extremely unlikely that pure tallow originating from diseased animals would be infectious; however, lower grade tallow might contain infectious impurities. A requirement that tallow derived from SRM for use in biodiesel contain no detectable protein would reduce this possibility. Transesterification of tallow to biodiesel. Several steps in the manufacturing process have at least the

  20. Risk analysis for renewable energy projects due to constraints arising

    Science.gov (United States)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  1. Energy saving and emission reduction: A project of coal-resource integration in Shanxi Province, China

    International Nuclear Information System (INIS)

    Zhang Jianjun; Fu Meichen; Geng Yuhuan; Tao Jin

    2011-01-01

    The small or middle coal mines with illegal operations in developing countries or regions can cause bad energy waste and environmental disruption. The project of coal-resource integration in Shanxi Province of China gives a new idea or an approach to energy saving and emission reduction. It is a social- and economic-ecological project. The paper shows the targets of energy saving and emission reduction in Shanxi Province, and analyses the aims, significance, design process and implementation of the integration project. Based on that, the paper discusses the challenges and opportunities the project brings. The analysis shows that the project of coal-resource integration in developing countries or regions can effectively improve mining technologies, collect capital and impel international cooperation and exchange. Finally, the paper analyses the concerns about the future, including the possible problems of implementation period, industrial updating, environmental impact and re-employment. However, the successful integration of coal resources can mitigate energy crisis and climate crisis and promote cleaner production effectively. - Highlights: → Coal-resource integration gives a new idea or an approach to energy saving and emission reduction. → Coal-resource integration mitigates climate crisis and promotes cleaner production. → Coal-resource integration brings challenges and opportunities to traditional mining industries.

  2. The Differential Effects of Social Media Sites for Promoting Cancer Risk Reduction.

    Science.gov (United States)

    Lauckner, Carolyn; Whitten, Pamela

    2016-09-01

    Social media are potentially valuable tools for disseminating cancer education messages, but the differential effects of various sites on persuasive outcomes are unknown. In an effort to inform future health promotion, this research tested the effects of Facebook, YouTube, Twitter, and blogs for delivering a cancer risk reduction message. Using an experimental design, participants were randomly placed in several conditions that delivered the same message but with different forms of social media. Effects on comprehension and attitudes were examined, as they are important variables in the behavior change process. YouTube led to higher comprehension and stronger attitudes toward cancer risk reduction than Twitter, but there were no differences between other sites. Additionally, YouTube led to stronger attitudes toward cancer risk reduction as compared to Facebook, but not any other sites. These results demonstrate that, even if the message is kept constant, the form of social media used to deliver content can have an effect on persuasive outcomes. More research is needed to determine the mechanisms behind the differences found, however. Altogether, this line of research is valuable for any individuals seeking to use social media for health promotion purposes and could have direct implications for the development of cancer risk reduction campaigns.

  3. ANALYSIS OF ECONOMIC RISK IN EUROPEAN INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Margareta Stela FLORESCU

    2012-06-01

    Full Text Available Risk is a reality of the economic environment, with consequences which cannot always be foreseen or anticipated. Risk management becomes more stringent as potential exo/endogenous vulnerability factors are rapidly increasing. Identifying risk areas, structuring risk factors and defining their probability, optimal management of resources in order to reduce risk factors, creating alternatives for each high-probability risk factor are part of project risk management. Risk is quantified through probability and incidence and is assessed using quantitative and qualitative methods.

  4. Revenue Risk Modelling and Assessment on BOT Highway Project

    Science.gov (United States)

    Novianti, T.; Setyawan, H. Y.

    2018-01-01

    The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.

  5. Risk profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought by some to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as insurance and can be utilized at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. This paper reports that either futures or swaps can be used to guarantee or modify product prices, an accomplishment very difficult or impossible to duplicate through other means, particularly with such integrity. Participation in futures or swaps does not necessarily maximize cashflow or present worth, it can either guarantee the price, put a minimum price in place or offer a combination of the above. A project or company can be protected for several years from downside price risk using swaps. Not being subject to market price swings substantially reduces the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cashflows or net incomes

  6. Cost-effectiveness analysis of risk reduction at nuclear power plants: What have we learned from experience

    International Nuclear Information System (INIS)

    Lochard, J.; Pages, P.

    1984-01-01

    Within the field of risk management techniques, cost-effectiveness analysis of risk reduction is now recognized as an adequate method for evaluating and defining the optimal allocation of protection and safety resources within large industrial systems. The paper considers some of the issues that arise in connection with cost-effectiveness analysis of risk reduction at nuclear power stations. Particular attention is called to both the interdependence between criteria that characterize risk reduction problems and the resulting aggregation and weighting procedures needed when the multidimensionality of criteria is explicitly taken into account. The discussion of these problems is illustrated with results of case studies on both public and occupational risk reduction at French PWRs during normal operation. (author)

  7. Sustainability Risk Evaluation for Large-Scale Hydropower Projects with Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Weiyao Tang

    2018-01-01

    Full Text Available As large-scale hydropower projects are influenced by many factors, risk evaluations are complex. This paper considers a hydropower project as a complex system from the perspective of sustainability risk, and divides it into three subsystems: the natural environment subsystem, the eco-environment subsystem and the socioeconomic subsystem. Risk-related factors and quantitative dimensions of each subsystem are comprehensively analyzed considering uncertainty of some quantitative dimensions solved by hybrid uncertainty methods, including fuzzy (e.g., the national health degree, the national happiness degree, the protection of cultural heritage, random (e.g., underground water levels, river width, and fuzzy random uncertainty (e.g., runoff volumes, precipitation. By calculating the sustainability risk-related degree in each of the risk-related factors, a sustainable risk-evaluation model is built. Based on the calculation results, the critical sustainability risk-related factors are identified and targeted to reduce the losses caused by sustainability risk factors of the hydropower project. A case study at the under-construction Baihetan hydropower station is presented to demonstrate the viability of the risk-evaluation model and to provide a reference for the sustainable risk evaluation of other large-scale hydropower projects.

  8. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  9. Setting priorities for private land conservation in fire-prone landscapes: Are fire risk reduction and biodiversity conservation competing or compatible objectives?

    Directory of Open Access Journals (Sweden)

    Alexandra D. Syphard

    2016-09-01

    Full Text Available Although wildfire plays an important role in maintaining biodiversity in many ecosystems, fire management to protect human assets is often carried out by different agencies than those tasked for conserving biodiversity. In fact, fire risk reduction and biodiversity conservation are often viewed as competing objectives. Here we explored the role of management through private land conservation and asked whether we could identify private land acquisition strategies that fulfill the mutual objectives of biodiversity conservation and fire risk reduction, or whether the maximization of one objective comes at a detriment to the other. Using a fixed budget and number of homes slated for development, we simulated 20 years of housing growth under alternative conservation selection strategies, and then projected the mean risk of fires destroying structures and the area and configuration of important habitat types in San Diego County, California, USA. We found clear differences in both fire risk projections and biodiversity impacts based on the way conservation lands are prioritized for selection, but these differences were split between two distinct groupings. If no conservation lands were purchased, or if purchases were prioritized based on cost or likelihood of development, both the projected fire risk and biodiversity impacts were much higher than if conservation lands were purchased in areas with high fire hazard or high species richness. Thus, conserving land focused on either of the two objectives resulted in nearly equivalent mutual benefits for both. These benefits not only resulted from preventing development in sensitive areas, but they were also due to the different housing patterns and arrangements that occurred as development was displaced from those areas. Although biodiversity conflicts may still arise using other fire management strategies, this study shows that mutual objectives can be attained through land-use planning in this region

  10. Parallel structures for disaster risk reduction and climate change adaptation in Southern Africa

    Directory of Open Access Journals (Sweden)

    Per Becker

    2013-01-01

    Full Text Available During the last decade, the interest of the international community in the concepts of disaster risk reduction and climate change adaptation has been growing immensely. Even though an increasing number of scholars seem to view these concepts as two sides of the same coin (at least when not considering the potentially positive effects of climate change, in practice the two concepts have developed in parallel rather than in an integrated manner when it comes to policy, rhetoric and funding opportunities amongst international organisations and donors. This study investigates the extent of the creation of parallel structures for disaster risk reduction and climate change adaptation in the Southern African Development Community (SADC region. The chosen methodology for the study is a comparative case study and the data are collected through focus groups and content analysis of documentary sources, as well as interviews with key informants. The results indicate that parallel structures for disaster risk reduction and climate change adaptation have been established in all but one of the studied countries. The qualitative interviews performed in some of the countries indicate that stakeholders in disaster risk reduction view this duplication of structures as unfortunate, inefficient and a fertile setup for conflict over resources for the implementation of similar activities. Additional research is called for in order to study the concrete effects of having these parallel structures as a foundation for advocacy for more efficient future disaster risk reduction and climate change adaptation.

  11. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  12. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  13. Cost-effectiveness analysis of risk reduction at nuclear power plants

    International Nuclear Information System (INIS)

    Lochard, J.; Maccia, C.; Pages, P.

    1985-01-01

    Cost-effectiveness analysis of risk reduction is now widely accepted as a rational analytical framework to consistently address the resource allocation problem underlying any risk management process. This paper presents how this technique can be usefully applied to complex systems such as the management of radioactive releases from nuclear power plants into the environment. (orig.) [de

  14. Data base on dose reduction research projects for nuclear power plants: Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Baum, J.W.

    1989-05-01

    This is the third volume in a series of reports that provide information on dose-reduction research and health physics technology for nuclear power plants. The information is taken from data base maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. This report presents information on 80 new projects, covering a wide area of activities. Projects on steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Collective dose data from the United States and other countries are also presented. In the conclusion, we suggest that although new advanced reactor design technology will eventually reduce radiation exposures at nuclear power plants to levels below serious concern, in the interim an aggressive approach to dose reduction remains necessary. 20 refs.

  15. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    Science.gov (United States)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  16. The Good, The Bad and The Ugly: Disaster Risk Reduction (DRR) Versus Disaster Risk Creation (DRC)

    Science.gov (United States)

    Lewis, James

    2012-01-01

    In understanding and trying to reduce the risk from disasters, connections are often articulated amongst poverty, vulnerability, risk, and disasters. These are welcome steps, but the approach taken in top-down international documents is rarely to articulate explicitly that vulnerability accrues from a wide variety of dynamic and long-term processes. Neglecting these processes—and failing to explore their links with poverty, risk, and disasters—tends to encourage disaster risk creation. This paper identifies seven examples of on-the-ground realities of long-term vulnerability within two clusters: Endangerment: 1 Environmental degradation. 2 Discrimination. 3 Displacement. Impoverishment: 4 Self-seeking public expenditure. 5 Denial of access to resources. 6 Corruption. 7 Siphoning of public money. Examples are presented as vignettes, many contemporary and many rooted in historical contexts, to demonstrate the extent to which “vulnerability drivers” emanate from greed, the misuse of political and commercial power, mismanagement and incompetence amongst other behaviours. Moving forward to the tackling of disaster risk creation, instead of simply seeking disaster risk reduction, requires detailed investigation into these contemporary and historical realities of the causes of vulnerability. That would support the integration of disaster risk reduction within the many wider contexts that foment and perpetuate vulnerability. PMID:22919564

  17. The Good, The Bad and The Ugly: Disaster Risk Reduction (DRR) Versus Disaster Risk Creation (DRC).

    Science.gov (United States)

    Lewis, James

    2012-06-21

    In understanding and trying to reduce the risk from disasters, connections are often articulated amongst poverty, vulnerability, risk, and disasters. These are welcome steps, but the approach taken in top-down international documents is rarely to articulate explicitly that vulnerability accrues from a wide variety of dynamic and long-term processes. Neglecting these processes-and failing to explore their links with poverty, risk, and disasters-tends to encourage disaster risk creation. This paper identifies seven examples of on-the-ground realities of long-term vulnerability within two clusters: Endangerment: 1 Environmental degradation. 2 Discrimination. 3 Displacement. Impoverishment: 4 Self-seeking public expenditure. 5 Denial of access to resources. 6 Corruption. 7 Siphoning of public money. Examples are presented as vignettes, many contemporary and many rooted in historical contexts, to demonstrate the extent to which "vulnerability drivers" emanate from greed, the misuse of political and commercial power, mismanagement and incompetence amongst other behaviours. Moving forward to the tackling of disaster risk creation, instead of simply seeking disaster risk reduction, requires detailed investigation into these contemporary and historical realities of the causes of vulnerability. That would support the integration of disaster risk reduction within the many wider contexts that foment and perpetuate vulnerability.

  18. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  19. Ethical Responsibility of Governance for Integrating Disaster Risk Reduction with Development

    Science.gov (United States)

    Parkash Gupta, Surya

    2015-04-01

    The development in the public as well as the private sectors is controlled and regulated, directly or indirectly by the governments at federal, provincial and local levels. If this development goes haphazard and unplanned, without due considerations to environmental constraints and potential hazards; it is likely to cause disasters or may get affected by disasters. Therefore, it becomes an ethical responsibility of the people involved in governance sector to integrate disaster risk reduction with development in their administrative territories through enforcement of appropriate policies, guidelines and regulatory mechanisms. Such mechanisms should address the social, scientific, economic, environmental, and legal requirements that play significant role in planning, implementation of developmental activities as well as disaster management. The paper focuses on defining the ethical responsibilities for the governance sector for integrating disaster risk reduction with development. It highlights the ethical issues with examples from two case studies, one from the Uttarakhand state and the other Odhisa state in India. The case studies illustrates how does it make a difference in disaster risk reduction if the governments own or do not own ethical responsibilities. The paper considers two major disaster events, flash floods in Uttarakhand state and Cyclone Phailin in Odhisa state, that happened during the year 2013. The study points out that it makes a great difference in terms of consequences and response to disasters when ethical responsibilities are owned by the governance sector. The papers attempts to define these ethical responsibilities for integrating disaster risk reduction with development so that the governments can be held accountable for their acts or non-actions.

  20. Smartphone Delivery of Mobile HIV Risk Reduction Education.

    Science.gov (United States)

    Phillips, Karran A; Epstein, David H; Mezghanni, Mustapha; Vahabzadeh, Massoud; Reamer, David; Agage, Daniel; Preston, Kenzie L

    2013-01-01

    We sought to develop and deploy a video-based smartphone-delivered mobile HIV Risk Reduction (mHIVRR) intervention to individuals in an addiction treatment clinic. We developed 3 video modules that consisted of a 10-minute HIVRR video, 11 acceptability questions, and 3 knowledge questions and deployed them as a secondary study within a larger study of ecological momentary and geographical momentary assessments. All 24 individuals who remained in the main study long enough completed the mHIVRR secondary study. All 3 videos met our a priori criteria for acceptability "as is" in the population: they achieved median scores of ≤2.5 on a 5-point Likert scale; ≤20% of the individuals gave them the most negative rating on the scale; a majority of the individuals stated that they would not prefer other formats over video-based smartphone-delivered one (all P smartphone is acceptable, feasible and may increase HIV/STD risk reduction knowledge. Future studies, with pre-intervention assessments of knowledge and random assignment, are needed to confirm these findings.

  1. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  2. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  3. NGNP Risk Management Database: A Model for Managing Risk

    International Nuclear Information System (INIS)

    Collins, John

    2009-01-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft(reg s ign) Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool's design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  4. NGNP Risk Management Database: A Model for Managing Risk

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  5. Shell’s use of science in de-risking projects

    CSIR Research Space (South Africa)

    Rossouw, N

    2017-10-01

    Full Text Available This presentation discusses Shell’s use of science in de-risking projects. The presentation includes examples of applying science in the De-Risking process, supporting scientific research and De-Risking the Karoo Basin....

  6. Study On Risk Handling Strategy Of Road Contruction Projects In Jayapura City

    Directory of Open Access Journals (Sweden)

    Irianto

    2017-08-01

    Full Text Available Project risk is an event or an uncertain condition which if it appears will have a threat on the project object. Many contractors still do not understand the threats that occur in the project they still assume that risks are always harmful. Based on data from the Papua Public Works procurement service that the implementation of road improvement projects always faces problems. This research is an explorative and descriptive study which explores the risks threats that occur in the project from the contractors perspective in Jayapura Papua Province Indonesia. The object of this research is the company contractor involved in the implementation of road improvement project in Jayapura whereas the respondent is the project manager and the field supervisor involved in the implementation of road improvement project The analysis result shows that the overall level of risk is in very low category and the biggest risks affecting contractors in sequence are 1 material delays from suppliers 2 material inventories 3 design difficulties 4 incorrectly shipped material volumes 5 changes to specifications by the owner 6 difficulty in obtaining materials and equipment 7 material price increases 8 over quality 9 damage to machine tools 10 weakening the bearing capacity of subgrade soil. While the response to risks threats that occur in road improvement projects is to reduce and avoid.

  7. Risk Management in Future Romanian E-Government 2.0 Projects

    Directory of Open Access Journals (Sweden)

    Didraga Otniel

    2015-08-01

    Full Text Available E-government public services in Romania must follow unitary procedures considering the new requirements of the European Union from the Digital Agenda for Europe Strategy 2020. E-government 2.0 has to be implemented because of the cultural and behavioral transformations in the interaction between governments and users of e-services. E-government 2.0 projects use tools and techniques of social media to accomplish their goals. This article examines the possible risk categories and the risk management procedures needed to mitigate risks in future Romanian e-government projects, according to the strategic lines of development for the Digital Agenda. We propose a risk management plan for the e-government lines of action within the strategic lines of development that includes identifying, assessing, and mitigating the risks. New and modernized government services through e-government 2.0 projects that apply risk management will bring a significant improvement in how citizens and businesses relate to government and will increase the use of e-government services.

  8. Investment Decision Support for Engineering Projects Based on Risk Correlation Analysis

    Directory of Open Access Journals (Sweden)

    Yan Liu

    2012-01-01

    Full Text Available Investment decisions are usually made on the basis of the subjective judgments of experts subjected to the information gap during the preliminary stages of a project. As a consequence, a series of errors in risk prediction and/or decision-making will be generated leading to out of control investment and project failure. In this paper, the variable fuzzy set theory and intelligent algorithms integrated with case-based reasoning are presented. The proposed algorithm manages the numerous fuzzy concepts and variable factors of a project and also sets up the decision-making process in accordance with past cases and experiences. Furthermore, it decreases the calculation difficulty and reduces the decision-making reaction time. Three types of risk correlations combined with different characteristics of engineering projects are summarized, and each of these correlations is expounded at the project investment decision-making stage. Quantitative and qualitative change theories of variable fuzzy sets are also addressed for investment risk warning. The approach presented in this paper enables the risk analysis in a simple and intuitive manner and realizes the integration of objective and subjective risk assessments within the decision-makers' risk expectation.

  9. Development of Risk Uncertainty Factors from Historical NASA Projects

    Science.gov (United States)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  10. Short and long term efficiencies of debris risk reduction measures: Application to a European LEO mission

    Science.gov (United States)

    Lang, T.; Kervarc, R.; Bertrand, S.; Carle, P.; Donath, T.; Destefanis, R.; Grassi, L.; Tiboldo, F.; Schäfer, F.; Kempf, S.; Gelhaus, J.

    2015-01-01

    Recent numerical studies indicate that the low Earth orbit (LEO) debris environment has reached a point such that even if no further space launches were conducted, the Earth satellite population would remain relatively constant for only the next 50 years or so. Beyond that, the debris population would begin to increase noticeably, due to the production of collisional debris (Liou and Johnson, 2008). Measures to be enforced play thus a major role to preserve an acceptable space mission risk and ensure sustainable space activities. The identification of such measures and the quantification of their efficiency over time for LEO missions is of prime concern in the decision-making process, as it has been investigated for the last few decades by the Inter-Agency Space Debris Coordination Committee (IADC). This paper addresses the final results of a generic methodology and the characteristics of a tool developed to assess the efficiency of the risk reduction measures identified for the Sentinel-1 (S1) mission. This work is performed as part of the 34-month P2-ROTECT project (Prediction, Protection & Reduction of OrbiTal Exposure to Collision Threats), funded by the European Union within the Seventh Framework Programme. Three ways of risk reduction have been investigated, both in short and long-term, namely: better satellite protection, better conjunction prediction, and cleaner environment. According to our assumptions, the S1 mission vulnerability evaluations in the long term (from 2093 to 2100) show that full compliance to the mitigation measures leads to a situation twice safer than that induced by an active debris removal of 5 objects per year in a MASTER2009 Business-As-Usual context. Because these measures have visible risk reduction effects in the long term, complementary measures with short response time are also studied. In the short term (from 2013 to 2020), a better prediction of the conjunctions is more efficient than protecting the satellite S1 itself. By

  11. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  12. Syncrude emissions reduction project

    Energy Technology Data Exchange (ETDEWEB)

    Fiedler, M.A. [Alstom Power Inc., Knoxville, TN (United States); Ibbotson, P. [Syncrude Canada Ltd., Calgary, AB (Canada)

    2008-07-01

    This paper described an emissions reduction project conducted by Syncrude Canada and various other companies currently developing and processing oil sands in Alberta. Syncrude's upgrader expansion program included the installation of an ammonia-based wet flue gas desulfurizer (FGD) designed to remove sulphur dioxide (SO{sub 2}) from a coker train. Syncrude is also installing the FGD technology at its existing plants. It is expected that installation of the FGDs will reduced total site emissions of SO{sub 2} by 60 per cent. The fluid cokers are used to crack the long hydrocarbon chain bitumen molecules into shorter molecules. It is expected that the FGD system will also reduce particulate and SO{sub 3} levels. The FGD system was selected after an evaluation of technologies used by the coal-fired power industry. A dry FGD system was selected to operate above the water saturation temperature of the flue gas. Calcium oxide was used as a reagent. Hot gas was quenched in a spray dryer absorber with a slurry of calcium hydroxide. Rotary atomizers were used to developer uniform droplets of slurry. The system's fabric filter was a low ratio reverse gas-cleaned unit. Particulate matter from the gases was deposited on the interior of the filter bags. Clean hot gas was drawn through reverse gas fans into a reverse gas manifold. A timeline of the FGD technology installation process was included. 3 tabs., 28 figs.

  13. An interdisciplinary approach to volcanic risk reduction under conditions of uncertainty: a case study of Tristan da Cunha

    Science.gov (United States)

    Hicks, A.; Barclay, J.; Simmons, P.; Loughlin, S.

    2013-12-01

    This research project adopted an interdisciplinary approach to volcanic risk reduction on the remote volcanic island of Tristan da Cunha (South Atlantic). New data were produced that: (1) established no spatio-temporal pattern to recent volcanic activity; (2) quantified the high degree of scientific uncertainty around future eruptive scenarios; (3) analysed the physical vulnerability of the community as a consequence of their geographical isolation and exposure to volcanic hazards; (4) evaluated social and cultural influences on vulnerability and resilience. Despite their isolation and prolonged periods of hardship, islanders have demonstrated an ability to cope with and recover from adverse events. This resilience is likely a function of remoteness, strong kinship ties, bonding social capital, and persistence of shared values and principles established at community inception. While there is good knowledge of the styles of volcanic activity on Tristan, given the high degree of scientific uncertainty about the timing, size and location of future volcanism, a qualitative scenario planning approach was used as a vehicle to convey this information to the islanders. This deliberative, anticipatory method allowed on-island decision makers to take ownership of risk identification, management and capacity building within their community. This paper demonstrates the value of integrating social and physical sciences with development of effective, tailored communication strategies in volcanic risk reduction.

  14. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  15. 77 FR 33158 - Plumas National Forest, California, Sugarloaf Hazardous Fuels Reduction Project

    Science.gov (United States)

    2012-06-05

    ... Fuels Reduction Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an... National Forest (PNF) will prepare an environmental impact statement (EIS) on the Sugarloaf Hazardous Fuels... to the economic stability of rural communities through: fuels treatments; group selections (GS); area...

  16. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk

  17. A Group Intervention for HIV/STI Risk Reduction among Indian Couples

    Directory of Open Access Journals (Sweden)

    Ritu Nehra

    2013-12-01

    Full Text Available Background: HIV in India is transmitted primarily by heterosexual contact. The present study sought to test the feasibility of a group HIV/STI risk reduction intervention among heterosexual couples in India. Methods: Focus groups and key informant interviews were used in 2008 to culturally tailor the intervention. Thirty sexually active and HIV/STI negative couples were enrolled and assessed regarding risk behavior and sexual barrier acceptability. Gender-concordant group sessions used cognitive behavioral strategies for HIV/STI prevention. Results: At baseline, male condom use was low (36%; no participants reported use of female condoms or vaginal gels. HIV knowledge was low; women had more HIV knowledge and more positive attitudes towards condom use than men. Post-intervention, willingness to use all barrier products (t = 10.0, P< .001 and intentions to avoid risk behavior increased (t = 5.62, P< .001. Conclusion: This study illustrates the feasibility of utilizing a group intervention to enhance HIV/STI risk reduction among Indian couples.

  18. Sexual health risk reduction interventions for people with severe mental illness: a systematic review.

    Science.gov (United States)

    Pandor, Abdullah; Kaltenthaler, Eva; Higgins, Agnes; Lorimer, Karen; Smith, Shubulade; Wylie, Kevan; Wong, Ruth

    2015-02-12

    Despite variability in sexual activity among people with severe mental illness, high-risk sexual behavior (e.g. unprotected intercourse, multiple partners, sex trade and illicit drug use) is common. Sexual health risk reduction interventions (such as educational and behavioral interventions, motivational exercises, counselling and service delivery), developed and implemented for people with severe mental illness, may improve participants' knowledge, attitudes, beliefs behaviors or practices (including assertiveness skills) and could lead to a reduction in risky sexual behavior. This systematic review evaluates the effectiveness of sexual health risk reduction interventions for people with severe mental illness. Thirteen electronic databases (including MEDLINE, EMBASE and PsycINFO) were searched to August 2014, and supplemented by hand-searching relevant articles and contacting experts. All controlled trials (randomized or non-randomized) comparing the effectiveness of sexual health risk reduction interventions with usual care for individuals living in the community with severe mental illness were included. Outcomes included a range of biological, behavioral and proxy endpoints. Narrative synthesis was used to combine the evidence. Thirteen controlled trials (all from the USA) were included. Although there was no clear and consistent evidence that interventions reduce the total number of sex partners or improved behavioral intentions in sexual risk behavior, positive effects were generally observed in condom use, condom protected intercourse and on measures of HIV knowledge, attitudes to condom use and sexual behaviors and practices. However, the robustness of these findings is low due to the large between study variability, small sample sizes and low-to-moderate quality of included studies. There is insufficient evidence at present to fully support or reject the identified sexual health risk reduction interventions for people with severe mental illness. Given the

  19. US-Soviet cooperation in countering nuclear terrorism: the role of risk reduction centers

    International Nuclear Information System (INIS)

    Nunn, S.; Warner, J.W.

    1987-01-01

    Preventing nuclear terrorism should be high on the agenda of US-Soviet relations. Indeed, the specter of nuclear terrorism, more than any other factor originally prompted and has subsequently sustained the author's deep interest in US-Soviet agreements on establishment of US-Soviet Nuclear Risk Reduction Centers and other important risk-reduction measures. Such centers can play an invaluable role in facilitating discussions aimed at forestalling possible contingencies and in providing a mechanism for dampening escalatory dangers that might otherwise result from any future nuclear terrorism incident. In addition to these crucial substantive functions, the centers could serve to reassure anxious publics that the governments they have entrusted with command authority over tens of thousands of nuclear devices are giving the highest priority to reducing the risk that any of them will ever be used, whether by design or by accident. Nuclear risk Reduction Centers are an idea whose time has come

  20. Statistical CT noise reduction with multiscale decomposition and penalized weighted least squares in the projection domain

    International Nuclear Information System (INIS)

    Tang Shaojie; Tang Xiangyang

    2012-01-01

    Purposes: The suppression of noise in x-ray computed tomography (CT) imaging is of clinical relevance for diagnostic image quality and the potential for radiation dose saving. Toward this purpose, statistical noise reduction methods in either the image or projection domain have been proposed, which employ a multiscale decomposition to enhance the performance of noise suppression while maintaining image sharpness. Recognizing the advantages of noise suppression in the projection domain, the authors propose a projection domain multiscale penalized weighted least squares (PWLS) method, in which the angular sampling rate is explicitly taken into consideration to account for the possible variation of interview sampling rate in advanced clinical or preclinical applications. Methods: The projection domain multiscale PWLS method is derived by converting an isotropic diffusion partial differential equation in the image domain into the projection domain, wherein a multiscale decomposition is carried out. With adoption of the Markov random field or soft thresholding objective function, the projection domain multiscale PWLS method deals with noise at each scale. To compensate for the degradation in image sharpness caused by the projection domain multiscale PWLS method, an edge enhancement is carried out following the noise reduction. The performance of the proposed method is experimentally evaluated and verified using the projection data simulated by computer and acquired by a CT scanner. Results: The preliminary results show that the proposed projection domain multiscale PWLS method outperforms the projection domain single-scale PWLS method and the image domain multiscale anisotropic diffusion method in noise reduction. In addition, the proposed method can preserve image sharpness very well while the occurrence of “salt-and-pepper” noise and mosaic artifacts can be avoided. Conclusions: Since the interview sampling rate is taken into account in the projection domain

  1. Mitigating fall risk: A community fall reduction program.

    Science.gov (United States)

    Reinoso, Humberto; McCaffrey, Ruth G; Taylor, David W M

    One fourth of all American's over 65 years of age fall each year. Falls are a common and often devastating event that can pose a serious health risk for older adults. Healthcare providers are often unable to spend the time required to assist older adults with fall risk issues. Without a team approach to fall prevention the system remains focused on fragmented levels of health promotion and risk prevention. The specific aim of this project was to engage older adults from the community in a fall risk assessment program, using the Stopping Elderly Accidents, Deaths & Injuries (STEADI) program, and provide feedback on individual participants' risks that participants could share with their primary care physician. Older adults who attended the risk screening were taking medications that are known to increase falls. They mentioned that their health care providers do not screen for falls and appreciated a community based screening. Copyright © 2017 Elsevier Inc. All rights reserved.

  2. Mapping Disaster Risk Reduction and Climate Change Adaptation: progress in South Africa

    Science.gov (United States)

    Storie, Judith M.

    2018-05-01

    Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA) strategies in Africa are on the increase. South Africa is no different, and a number of strategies have seen the light in aid of reducing disaster risk and adapting to cli-mate change. The DRR and CCA processes include the mapping of location and extent of known and potential hazards, vulnerable communities and environments, and opportunities that may exist to manage these risks. However, the mapping of often fast-changing urban and rural spaces in a standardized manner presents challenges that relate to processes, scales of data capture, level of detail recorded, software and compatibility related to data formats and net-works, human resources skills and understanding, as well as differences in approaches to the nature in which the map-ping processes are executed and spatial data is managed. As a result, projects and implementation of strategies that re-late to the use of such data is affected, and the success of activities based on the data may therefore be uncertain. This paper investigates data custodianship and data categories that is processed and managed across South Africa. It explores the process and content management of disaster risk and climate change related information and defines the challenges that exist in terms of governance. The paper also comments on the challenges and potential solutions for the situation as it gives rise to varying degrees of accuracy, effectiveness for use, and applicability of the spatial data available to affect DRR and improve the value of CCA programmes in the region.

  3. Cost effectiveness of robotics and remote tooling for occupational risk reduction at a nuclear fuel fabrication facility

    Energy Technology Data Exchange (ETDEWEB)

    Lochard, Jacques

    1989-08-01

    This case study, related to the design stage of a fuel fabrication facility, presents the evaluation of alternative options to manipulate mixed oxide fuel rods in a quality control shop. It is based on a study performed in the framework of the 'MELOX project' developed by COGEMA in France. The methodology for evaluating robotic actions is resulting from a research work part funded by the IAEA under the co-ordinated research programme on 'Comparison of cost-effectiveness of risk reduction among different energy systems', and by the commission of the European Communities under the research and training programme on radiation protection.

  4. Cost effectiveness of robotics and remote tooling for occupational risk reduction at a nuclear fuel fabrication facility

    International Nuclear Information System (INIS)

    Lochard, Jacques

    1989-01-01

    This case study, related to the design stage of a fuel fabrication facility, presents the evaluation of alternative options to manipulate mixed oxide fuel rods in a quality control shop. It is based on a study performed in the framework of the 'MELOX project' developed by COGEMA in France. The methodology for evaluating robotic actions is resulting from a research work part funded by the IAEA under the co-ordinated research programme on 'Comparison of cost-effectiveness of risk reduction among different energy systems', and by the commission of the European Communities under the research and training programme on radiation protection

  5. Shedding New Light on Project Portfolio Risk Management

    Directory of Open Access Journals (Sweden)

    Mariusz Hofman

    2017-10-01

    Full Text Available This paper constitutes an innovative attempt to analyse the risks and negative phenomena dependencies within a project portfolio. Based on the available literature, the risks and negative phenomena (that is, the problems with the availability of resources, interpersonal conflicts, irregularities in the portfolio balance, etc. specific to a project portfolio were identified. Theoretical constructs were then used to connect the identified risks with the negative phenomena. Structural equations were used to confirm the existence and quality of these constructs, as well as models describing connections between phenomena. The determination of the structural equations also provided a setting in which statistical methods (χ2, RMSEA and CFI could be used to investigate the level of fit of the constructs and models to the empirical data.

  6. Research into specific risk assessment in project financing

    Directory of Open Access Journals (Sweden)

    Ivana Bestvina Bukvić

    2013-12-01

    Full Text Available An assessment of investment justification in terms of risk enables the decision maker (investor to select, among available alternatives, the one with the most favourable correlation between the expected profit and assumed risk. At the micro level, the uncertainty of business success is extremely high in production activities, which is an additional incentive for taking a comprehensive approach to the issue of investment decision-making and the development of risk assessment techniques applicable in this particular segment of industry. Given the complexity of the manufacturing process, the length of the production cycle, market conditions, and entity-specific risks (which are difficult to measure, projects in manufacturing industry require a detailed and comprehensive assessment of specific risk factors and their cost-effectiveness. Ne - vertheless, since specific risks can be diversified, investment proposal assessments in practice usually do not cover their quantification and analysis. However, the majority of business entities do not have enough active projects in various industries to be able to fully diversify their business and thus minimize the level of specific risks. The impact of specific factors becomes one of the most important elements for business success. This paper analyses how far risk assessment methods regarding specific risks are used in practice. Furthermore, it analyses the significance of specific risks for total investment risk. This study gives new insi - ghts into the significance of specific risks to the overall investment assessment and the need for permanent development of traditionally used investment assessment models.

  7. NASA Space Radiation Risk Project: Overview and Recent Results

    Science.gov (United States)

    Blattnig, Steve R.; Chappell, Lori J.; George, Kerry A.; Hada, Megumi; Hu, Shaowen; Kidane, Yared H.; Kim, Myung-Hee Y.; Kovyrshina, Tatiana; Norman, Ryan B.; Nounu, Hatem N.; hide

    2015-01-01

    The NASA Space Radiation Risk project is responsible for integrating new experimental and computational results into models to predict risk of cancer and acute radiation syndrome (ARS) for use in mission planning and systems design, as well as current space operations. The project has several parallel efforts focused on proving NASA's radiation risk projection capability in both the near and long term. This presentation will give an overview, with select results from these efforts including the following topics: verification, validation, and streamlining the transition of models to use in decision making; relative biological effectiveness and dose rate effect estimation using a combination of stochastic track structure simulations, DNA damage model calculations and experimental data; ARS model improvements; pathway analysis from gene expression data sets; solar particle event probabilistic exposure calculation including correlated uncertainties for use in design optimization.

  8. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  9. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    Science.gov (United States)

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  10. Improvement of the projection models for radiogenic cancer risk

    International Nuclear Information System (INIS)

    Tong Jian

    2005-01-01

    Calculations of radiogenic cancer risk are based on the risk projection models for specific cancer sites. Improvement has been made for the parameters used in the previous models including introductions of mortality and morbidity risk coefficients, and age-/ gender-specific risk coefficients. These coefficients have been applied to calculate the radiogenic cancer risks for specific organs and radionuclides under different exposure scenarios. (authors)

  11. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  12. Farmers prone to drought risk : why some farmers undertake farm-level risk-reduction measures while others not?

    NARCIS (Netherlands)

    Gidey, T.G.; van der Veen, A.

    2015-01-01

    This research investigates farmers’ cognitive perceptions of risk and the behavioral intentions to undertake farm-level risk-reduction measures. It has been observed that people who are susceptible to natural hazards often fail to act, or do very little, to protect their assets or lives. To answer

  13. Identification of risk factors affecting construction of projects: The case of emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available Controlling project risks has become a daunting task in construction and this can be attributed to issues such as the nature of modern projects. The challenge is that risk appears unannounced at any project phase for various reasons and thereby affecting the performance and the success of unprepared projects. The current studies that explored risk matters include Pehlivan and Öztemir (2015, Katre, and Ghaitidak (2016 amongst others. However, there is absence of unanimity from these studies on risk factors in construction. Thus, this article was instigated in order to identify and classify risk factors that affect the chances of project success. The research methodology selected for this article comprised of peer-reviewed articles between the periods of 2007 to 2017. This approach involved a comprehensive scrutiny into scholarly articles to comprehend risks in construction projects. Following a conceptual analysis, eighty factors were identified and classified under the following; technical, construction, financial, socio-political, physical, organisational, and environmental and other risks. From these categories, political instability was, found to be the most influential risk factor in construction projects and this factor was classified within the socio-political category and this category has total of 11 factors. Finding suggests the need for further empirical study.

  14. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  15. First Evaluation of a Contingency Management Intervention Addressing Adolescent Substance Use and Sexual Risk Behaviors: Risk Reduction Therapy for Adolescents.

    Science.gov (United States)

    Letourneau, Elizabeth J; McCart, Michael R; Sheidow, Ashli J; Mauro, Pia M

    2017-01-01

    There is a need for interventions that comprehensively address youth substance use disorders (SUD) and sexual risk behaviors. Risk Reduction Therapy for Adolescents (RRTA) adapts a validated family-focused intervention for youth SUD to include sexual risk reduction components in a single intervention. In this first evaluation of RRTA, drug court involved youth were randomly assigned to RRTA (N=45) or usual services (US; N=60) and followed through 12-months post-baseline. RRTA included weekly cognitive behavior therapy and behavior management training and contingency-contracting with a point earning system managed by caregivers targeting drug use and sexual risk antecedents. Longitudinal models estimated within-group change and between-group differences through 6- and 12-month follow-up on outcomes for substance use, sexual risk behaviors, and protective HIV behaviors. Robust effects of the intervention were not detected under conditions of the study that included potent background interventions by the juvenile drug court. Considerations about future development and testing of sexual risk reduction therapy for youth are discussed, including the potential role of contingency management in future interventions. Copyright © 2016 Elsevier Inc. All rights reserved.

  16. The Strategic Risk Management at Different Stages of Innovation Project

    Directory of Open Access Journals (Sweden)

    Pysmak Viktoriia O.

    2017-03-01

    Full Text Available This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried out. The concept of «innovation project» has been considered, its features and characteristics have been allocated. The basic tools of the strategic management of enterprise in current conditions have been described. The basic principles of the strategic risk management of innovation activity have been formulated. A scheme with allocating the stages of innovation activity and the risks involved has been elaborated, taking into consideration the factors of occurrence of risks. The main groups of management strategies have been allocated. The tasks facing the managerial board in the process of the strategic risk management at every stage of the innovation project have been formulated.

  17. Sexual risk reduction among Zambian couples | Jones | SAHARA-J ...

    African Journals Online (AJOL)

    Zambia has over 1 million HIV infections nationwide and an urban prevalence rate of 23%. This study compared the impact of male involvement in multiple and single session risk reduction interventions among inconsistent condom users in Zambia and the role of serostatus among HIV-seropositive and serodiscordant ...

  18. Living with risk. A global review of disaster reduction initiatives. Preliminary version

    International Nuclear Information System (INIS)

    2002-01-01

    In recent years the world has witnessed an interminable succession of disasters - floods, storms, earthquakes, landslides, volcanic eruptions and wildfires that have claimed many thousands of lives, caused material losses in the tens of billions of dollars, and inflicted a terrible toll on developing countries in particular, where disasters divert attention and resources needed desperately to escape poverty. Communities will always face natural hazards, but today's disasters are often generated by, or at least exacerbated by, human activities. At the most dramatic level, human activities are changing the natural balance of the earth, interfering as never before with the atmosphere, the oceans, the polar ice caps, the forest cover and the natural pillars that make our world a livable home. But we are also putting ourselves in harm's way in less visible ways. At no time in human history have so many people lived in cities clustered around seismically active areas. Destitution and demographic pressure have led more people than ever before to live in flood plains or in areas prone to landslides. Poor land-use planning; environmental mismanagement; and a lack of regulatory mechanisms both increase the risk and exacerbate the effects of disasters. Living with risk: a global review of disaster reduction is the first comprehensive effort by the United Nations system to take stock of disaster reduction initiatives throughout the world. Coordinated by the secretariat of the International Strategy for Disaster Reduction (ISDR), the report discusses current disaster trends, assesses policies aimed at mitigating the impact of disasters, and offers examples of successful initiatives. It also recommends that risk reduction be integrated into sustainable development at all levels - global, national and local. Most of all, Living with risk shows that we are far from helpless in the face of natural hazards. Early warning and risk reduction measures have been important factors in

  19. Comparative effectiveness of personalized lifestyle management strategies for cardiovascular disease risk reduction

    NARCIS (Netherlands)

    P. Chu (Paula); A. Pandya; J.A. Salomon (Joshua A); S.J. Goldie (Sue J); Hunink, M.G.M. (M.G. Myriam)

    2015-01-01

    textabstractBackground-Evidence shows that healthy diet, exercise, smoking interventions, and stress reduction reduce cardiovascular disease risk. We aimed to compare the effectiveness of these lifestyle interventions for individual risk profiles and determine their rank order in reducing 10-year

  20. Harnessing farmers' knowledge and perceptions for health-risk reduction in wastewater-irrigated agriculture

    DEFF Research Database (Denmark)

    Keraita, Bernard; Drechsel, Pay; Seidu, Razak

    2009-01-01

    This chapter addresses the importance of understanding farmers' knowledge and perceptions on health-risk and risk-reduction measures for the development of mutually acceptable risk-management strategies. Drawing on studies from different countries, the chapter shows that it is not realistic to ex...

  1. Harnessing Farmers' knowledge and perceptions for health-risk reduction in wastewater-irrigated agriculture

    DEFF Research Database (Denmark)

    Keraita, Bernhard; Drechsel, Pay; Seidu, Razak

    2010-01-01

    This chapter addresses the importance of understanding farmers’ knowledge and perceptions on health-risk and risk-reduction measures for the development of mutually acceptable risk-management strategies. Drawing on studies from different countries, the chapter shows that it is not realistic to ex...

  2. Mission Risk Reduction Regulatory Change Management

    Science.gov (United States)

    Scroggins, Sharon

    2007-01-01

    NASA Headquarters Environmental Management Division supports NASA's mission to pioneer the future in space exploration, scientific discovery, and aeronautics research by integrating environmental considerations into programs and projects early-on, thereby proactively reducing NASA's exposure to institutional, programmatic and operational risk. As part of this effort, NASA established the Principal Center for Regulatory Risk Analysis and Communication (RRAC PC) as a resource for detecting, analyzing, and communicating environmental regulatory risks to the NASA stakeholder community. The RRAC PC focuses on detecting emerging environmental regulations and other operational change drivers that may pose risks to NASA programs and facilities, and effectively communicating the potential risks. For example, regulatory change may restrict how and where certain activities or operations may be conducted. Regulatory change can also directly affect the ability to use certain materials by mandating a production phase-out or restricting usage applications of certain materials. Regulatory change can result in significant adverse impacts to NASA programs and facilities due to NASA's stringent performance requirements for materials and components related to human-rated space vehicles. Even if a regulation does not directly affect NASA operations, U.S. and international regulations can pose program risks indirectly through requirements levied on manufacturers and vendors of components and materials. For example, manufacturers can change their formulations to comply with new regulatory requirements. Such changes can require time-consuming and costly requalification certification for use in human spaceflight programs. The RRAC PC has implemented a system for proactively managing regulatory change to minimize potential adverse impacts to NASA programs and facilities. This presentation highlights the process utilized by the RRACPC to communicate regulatory change and the associated

  3. Ontological Analysis of the Project Risk Management Concept ‘Risk’

    Directory of Open Access Journals (Sweden)

    Uzulāns Juris

    2018-02-01

    Full Text Available The aim of the current research series is to examine the definitions of the concept ‘risk’ and analyze the concepts used in the definitions of ‘risk’ in the sources of these definitions in order to perform the ontological analysis of the concept of ‘risk’. Ontological and epistemological analysis of the concepts in the definition of the concept ‘risk’ was used to answer the question what ‘risk’ means in project management. This investigation represents a part of the research series where the ontological, epistemological and methodological analysis of project risk is performed with the aim to improve risk registers and risk management as a whole. In the previous studies the author analyzed the concept of ‘event’ that defines the content of the concept ‘risk’. The use of ‘event’ was analyzed in different sources to find out how the concept should be used. The ontological, epistemological and methodological analysis of the definitions of the concept ‘risk’ is the theoretical foundation for risk register creation because it is possible to create complete and understandable register for the participants of the project risk management process. The author believes that the conducted research helps establish confidence that ontological analysis is the method that together with the epistemological and methodological analysis provides opportunity to perform analysis of risk management sources aimed at improving risk management. The results of the study cannot be considered sufficient for deriving valid conclusions about project risk management and developing recommendations for improving risk management with regard to the content of the risk register. For valid conclusions and recommendations, a deeper research is needed which, first of all, would analyze a larger number of sources.

  4. Multiobjective genetic algorithm approaches to project scheduling under risk

    OpenAIRE

    Kılıç, Murat; Kilic, Murat

    2003-01-01

    In this thesis, project scheduling under risk is chosen as the topic of research. Project scheduling under risk is defined as a biobjective decision problem and is formulated as a 0-1 integer mathematical programming model. In this biobjective formulation, one of the objectives is taken as the expected makespan minimization and the other is taken as the expected cost minimization. As the solution approach to this biobjective formulation genetic algorithm (GA) is chosen. After carefully invest...

  5. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  6. A Hybrid MCDM Technique for Risk Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Kajal Chatterjee

    2018-02-01

    Full Text Available Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary to quantify the main risk indicators of the projects. Managing these requires suitable risk mitigation strategies to evaluate and analyse their severity. The existence of information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, to ensure balanced satisfaction of all participants, risk evaluation of these projects can be considered as an important part of the multi-criteria decision-making (MCDM process. In real-life problems, evaluation of project risks is often uncertain and even incomplete, and the prevailing methodologies fail to handle such situations. To address the problem, this paper extends the analytical network process (ANP methodology in the D numbers domain to handle three types of ambiguous information’s, viz. complete, uncertain, and incomplete, and assesses the weight of risk criteria. The D numbers based approach overcomes the deficiencies of the exclusiveness hypothesis and completeness constraint of Dempster–Shafer (D–S theory. Here, preference ratings of the decision matrix for each decision-maker are determined using a D numbers extended consistent fuzzy preference relation (D-CFPR. An extended multi-attributive border approximation area comparison (MABAC method in D numbers is then developed to rank and select the best alternative risk response strategy. Finally, an illustrative example from construction sector is presented to check the feasibility of the proposed approach. For checking the reliability of alternative ranking, a comparative analysis is performed with different MCDM approaches in D numbers domain. Based on different criteria weights, a sensitivity analysis of obtained ranking of the hybrid D-ANP-MABAC model is performed to verify the robustness of the proposed

  7. Improvement in spine bone density and reduction in risk of vertebral fractures during treatment with antiresorptive drugs.

    Science.gov (United States)

    Cummings, Steven R; Karpf, David B; Harris, Fran; Genant, Harry K; Ensrud, Kristine; LaCroix, Andrea Z; Black, Dennis M

    2002-03-01

    To estimate how much the improvement in bone mass accounts for the reduction in risk of vertebral fracture that has been observed in randomized trials of antiresorptive treatments for osteoporosis. After a systematic search, we conducted a meta-analysis of 12 trials to describe the relation between improvement in spine bone mineral density and reduction in risk of vertebral fracture in postmenopausal women. We also used logistic models to estimate the proportion of the reduction in risk of vertebral fracture observed with alendronate in the Fracture Intervention Trial that was due to improvement in bone mineral density. Across the 12 trials, a 1% improvement in spine bone mineral density was associated with a 0.03 decrease (95% confidence interval [CI]: 0.02 to 0.05) in the relative risk (RR) of vertebral fracture. The reductions in risk were greater than predicted from improvement in bone mineral density; for example, the model estimated that treatments predicted to reduce fracture risk by 20% (RR = 0.80), based on improvement in bone mineral density, actually reduce the risk of fracture by about 45% (RR = 0.55). In the Fracture Intervention Trial, improvement in spine bone mineral density explained 16% (95% CI: 11% to 27%) of the reduction in the risk of vertebral fracture with alendronate. Improvement in spine bone mineral density during treatment with antiresorptive drugs accounts for a predictable but small part of the observed reduction in the risk of vertebral fracture.

  8. Delivery improvements for CANDU projects

    International Nuclear Information System (INIS)

    Stephen Yu; Ken Hedges

    1998-01-01

    Future CANDU design will continue to meet emerging design and performance requirements as expected by the operating utilities, and will integrate new technologies into both the product features and work processes. Elements of this risk reduction strategy include feedback of lessons learned from operating plants, project experiences from previous projects, and replication of successful systems and equipment. Project implementation risk is minimized by up-front engineering and licensing prior to contract start. Enhanced competitiveness of the CANDU products is ensured by incorporating improvements based on updated technology. This paper summarizes the strategy used to enhance competitiveness of the CANDU products and the measures introduced to minimize risk during project implementation. This strategy provides a balance between innovation and proven designs; and between the desire for safety and operational improvements and the cost to achieve the improvements

  9. Risk of hospital admission for COPD following smoking cessation and reduction

    DEFF Research Database (Denmark)

    Godtfredsen, N S; Vestbo, J; Osler, M

    2002-01-01

    BACKGROUND: Little is known about the effects of changes in smoking habits on the subsequent risk of chronic obstructive pulmonary disease (COPD). The aim of this study was to investigate the relationship between smoking cessation and reduction and admission to hospital for COPD in a general...... by at least 50% between the two initial examinations without quitting and smokers who stopped smoking during this time were compared with continuous heavy smokers using a Cox proportional hazards model. RESULTS: During the follow up period 1,260 subjects (741 men and 519 women) were admitted to hospital...... for COPD. After multivariate adjustment, quitting smoking was associated with a significant reduction in the risk of hospital admission. The relative hazard (HR) was 0.57 (95% confidence interval (CI) 0.33 to 0.99). Those who reduced smoking did not show a significantly lower risk of hospitalisation than...

  10. Qualification program of the ASTRID SFR project: definition, methodology and associated risk evaluation and management - 15093

    International Nuclear Information System (INIS)

    Rodriguez, G.; Dirat, J.F.; Traina, A.; Christofari, M.

    2015-01-01

    The Preconceptual Design phase of the ASTRID French Sodium Fast Reactor project had the objective to integrate innovative options to meet the requirements of the 4. generation reactors and to comply with the related specifications. It was followed by the conceptual phase studies (AVP2 phase 2013-2015) where some technical options are left opened with an advanced option and a backup alternative. In the same time of the AVP2 phase studies, the qualification program related to ASTRID project was initiated. It consists in collecting the exhaustive list of research/development (R/D) needs and technological demonstration tests to be fulfilled on representative mockup prior to component implementation in the prototype. The ASTRID Qualification Program (AQP) objectives are to collect needs expressed by all engineering companies involved in ASTRID, and then to organize the answer to this expression of needs. This significant work of needs compilation has been divided in several tasks, according to the ASTRID project decomposition in the Product Breakdown Structure (PBS). Compilation of needs was jointly performed by engineering company, R/D responsible and coordinated by the ASTRID Qualification project responsible. It was associated with an evaluation of the maturity level of the technical options thanks to a Technological Readiness Level grid (TRL ranking table), an identification of major risks, and an evaluation of the R/D potentiality and associated facility platform. The methodology applied for the ASTRID Qualification Program (AQP) is presented. It is explained what methodology was used associated to the TRL process, and how is managed the associated risk analysis evaluation: evaluation of major risks, definition of a risk portfolio and a corresponding Action Plan for risk reduction (synthesized under the REM acronym: Risk Evaluation and Management). This methodology is a mean used to facilitate ASTRID risk-informed decision making, technology qualification and

  11. Risk Assessment in Financial Feasibility of Tanker Project Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Muhammad Badrus Zaman

    2017-09-01

    Full Text Available Every ship project would not be apart from risk and uncertainty issues. The inappropriate risk assessment process would have long-term impact, such as financial loss. Thus, risk and uncertainties analysis would be a very important process in financial feasibility determination of the project. This study analyzes the financial feasibility of 17,500 LTDW tanker project. Risk and uncertainty are two differentiated terminologies in this study, where risk focuses on operational risk due to shipbuilding process nonconformity to shipowner finance, while uncertainty focuses on variable costs that affect project cash flows. There are three funding scenarios in this study, where the percentage of funding with own capital and bank loan in scenario 1 is 100% : 0%, scenario 2 is 75% : 25%, and scenario 3 is 50% : 50%. Monte Carlo simulation method was applied to simulate the acceptance criteria, such as net present value (NPV, internal rate of return (IRR, payback period (PP, and profitability index (PI. The results of simulation show that 17,500 LTDW tanker project funding by scenario 1, 2 and 3 are feasible to run, where probability of each acceptance criteria was greater than 50%. Charter rate being the most sensitive uncertainty over project's financial feasibility parameters.

  12. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    Science.gov (United States)

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  13. Social Participation and Disaster Risk Reduction Behaviors in Tsunami Prone Areas

    Science.gov (United States)

    Witvorapong, Nopphol; Muttarak, Raya; Pothisiri, Wiraporn

    2015-01-01

    This paper examines the relationships between social participation and disaster risk reduction actions. A survey of 557 households in tsunami prone areas in Phang Nga, Thailand was conducted following the 2012 Indian Ocean earthquakes. We use a multivariate probit model to jointly estimate the likelihood of undertaking three responses to earthquake and tsunami hazards (namely, (1) following disaster-related news closely, (2) preparing emergency kits and/or having a family emergency plan, and (3) having an intention to migrate) and community participation. We find that those who experienced losses from the 2004 tsunami are more likely to participate in community activities and respond to earthquake hazards. Compared to men, women are more likely to prepare emergency kits and/or have an emergency plan and have a greater intention to migrate. Living in a community with a higher proportion of women with tertiary education increases the probability of engaging in community activities and carrying out disaster risk reduction measures. Individuals who participate in village-based activities are 5.2% more likely to undertake all three risk reduction actions compared to those not engaging in community activities. This implies that encouraging participation in community activities can have positive externalities in disaster mitigation. PMID:26153891

  14. NBS for Drought risks reduction in the Algarve (Portugal): selected achievements from PT FCT ProWaterMan and from EU FP7 MARSOL projects

    Science.gov (United States)

    Lobo-Ferreira, João-Paulo

    2017-04-01

    region. It included the evaluation of willingness of farmers to collaborate and pay for the use of Managed Aquifer Recharge (MAR) as a nature-based solution to minimize the drought impacts and to manage flood risk in the area. Close cooperation has been established between EIP Water Action Group MARsolutions and FP7 MARSOL INNO_DEMO (http://www.eip-water.eu/close-cooperation-between-eip-marsolutions-and-fp7-marsol-inno-demo-project ). In http://www.eip-water.eu/sites/default/files/Rel%20101_15.pdf a LNEC report is available, presenting a descriptive analysis of the responses to a survey about protection and preservation of groundwater conducted with a sample of Portuguese farmers of the Algarve region. It is possible that Direção Regional de Agricultura e Pescas do Algarve is willing to participate on the implementation the nature-based solutions as they will decrease the risk for agriculture losses. The Portuguese Water Agency has precipitation and flow bulletins for the Algarve, e.g. for Faro and Albufeira areas, in http://snirh.pt/index.php?idMain=1&idItem=1.1 . Concerning the climate change impact in Querença-Silves (QS) Aquifer, LNEC/University of Algarve MARSOL project teams presented descriptions regarding respectively groundwater recharge and flow simulations of future scenarios. E.g. Stigter et al. (2009, 2014) summarized achieved conclusions were "(1) (2020-2050) changes in recharge, particularly due to a reduction in autumn rainfall resulting in a longer dry period. More frequent droughts are predicted at the QS aquifer; (2) toward the end of the century (2069-2099), results indicate a significant decrease (mean 25 %) in recharge at QS aquifer, with an high decrease in absolute terms (mean 134 mm/year); and, (3) scenario modelling of groundwater flow shows its response to the predicted decreases in recharge and increases in pumping rates, with strongly reduced outflow into the coastal wetlands, whereas changes due to sea level rise are negligible". These

  15. Managing Risk and Uncertainty in Large-Scale University Research Projects

    Science.gov (United States)

    Moore, Sharlissa; Shangraw, R. F., Jr.

    2011-01-01

    Both publicly and privately funded research projects managed by universities are growing in size and scope. Complex, large-scale projects (over $50 million) pose new management challenges and risks for universities. This paper explores the relationship between project success and a variety of factors in large-scale university projects. First, we…

  16. Fiscal 1998 research report on the total electric power loss reduction project for Myanmer; 1998 nendo Myanmer koku denryoku soshitsu sogo teigen project chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of Japanese clean development mechanism, study was made on reduction of greenhouse effect gas emission from thermal power plants by reduction of power transmission and distribution losses of power systems in Myanmer. Study was made on technical power transmission and distribution losses for the national grid transmission system, 33kV sub- transmission system of Thaketa substation in Yangong city, and 6.6kV and 400V distribution systems of Latha and Lanmadaw townships in the downtown area of Yangong. Countermeasures for power loss reduction were considered on the basis of the study result. The loss reduction project plan includes a construction cost of 5,134,000US$, loss reduction of 7,726kW, and loss reduction of 33,213,000kWh. The project feasibility and profitability were evaluated by comparison between a financial internal rate of return (FIRR) and an opportunity cost assuming that a discount rate is the opportunity cost. As a result, FIRR was 17.36% and the discount rate was 8.89% in Myanmer. (NEDO)

  17. 76 FR 70955 - Helena Nation Forest: Dalton Mountain Forest Restoration & Fuels Reduction Project

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF AGRICULTURE Forest Service Helena Nation Forest: Dalton Mountain Forest Restoration & Fuels Reduction Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The Helena National Forest (HNF) is proposing on the Lincoln Ranger...

  18. Risk management tools from the traditional energy industry to wind energy projects

    International Nuclear Information System (INIS)

    Randall, G.; Marks, R.

    2010-01-01

    Risk-based analysis techniques are used to quantify and prioritize a wide variety of problems within the traditional fossil fuel and nuclear power industries. This poster presentation evaluated some of the risk analysis tools and methods used by the energy industry to quantify and manage wind energy development risks. A comprehensive risk-based approach for identifying the probability and consequences of potential concerns was presented for a sample wind energy project. The process determined objectives in relation to the project's net present value. Contributing domains included the energy production, prices, and operating costs of the project. Decision criteria used to evaluate the desirability of the wind project were then developed. Monte Carlo simulations were the used to aggregate individual risks into an overall total. The contribution of each element to the decision objective was calculated separately. The element outputs were than combined into a measure of aggregate risk exposure. Aggregate results were used to calculate the decision criteria. The decision objective was to determine if the energy cost was less than the avoided cost of other project options. The study showed that the approach can allow decision-makers to mitigate risks. However, the results are dependent on the quality of the input data. tabs., figs.

  19. The analysis of financial risk management application for NPP project in Indonesia

    International Nuclear Information System (INIS)

    Imam Bastori; Moch Djoko Birmano

    2012-01-01

    NPP Project is one of full dynamic, risky and challenging business. Application of financial risk management t in Nuclear Power Plant (NPP) project becomes one alternative to be considered carefully. This paper explains an analysis to make a decision in the risk management application so that it can be applied in the NPP's construction in Indonesia. As case study, is NPP of conventional PWR type of class 1150 MWe. To calculate the economics and financing of NPP is used Spreadsheet INOVASI, further the decision of financial risk management were analyzed using a Model of Cash Flow Adjustment, which developed by Richard Fairchild. The analysis showed that the Method of Cash Flow Adjustment developed by Richard Fairchild is better than the method of NPV Adjustment on a NPP project, because it have included the aspects of financial risk management. NPP project can only be executed if the NPV 2 0 and decision to execute the financial risk management should be based on NPVrm > NPV. The application of financial risk management in NPP project is not needed if an insurance premium more expensive than all costs of financial distress, unless the insurance company can give discount of at least 20%. (author)

  20. Projection of radiation-induced cancer risks across time and populations

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1991-01-01

    Various methods can be used to project the risks of radiation-induced cancer estimated in cohort studies beyond the period of follow-up and to other populations. The choice of risk projection model is reviewed based on data from studies such as those of the Japanese atomic bomb survivors and UK ankylosing spondylitis patients given X ray therapy. Risk estimates applicable to a UK population are calculated on the basis of various models, including those developed by the BEIR V Committee. It is emphasised that the continued follow-up of populations such as the Japanese atomic bomb survivors is of great importance in estimating lifetime risks. (author)

  1. Reduction of Systemic Risk by Means of Pigouvian Taxation.

    Science.gov (United States)

    Zlatić, Vinko; Gabbi, Giampaolo; Abraham, Hrvoje

    2015-01-01

    We analyze the possibility of reduction of systemic risk in financial markets through Pigouvian taxation of financial institutions, which is used to support the rescue fund. We introduce the concept of the cascade risk with a clear operational definition as a subclass and a network related measure of the systemic risk. Using financial networks constructed from real Italian money market data and using realistic parameters, we show that the cascade risk can be substantially reduced by a small rate of taxation and by means of a simple strategy of the money transfer from the rescue fund to interbanking market subjects. Furthermore, we show that while negative effects on the return on investment (ROI) are direct and certain, an overall positive effect on risk adjusted return on investments (ROIRA) is visible. Please note that the taxation is introduced as a monetary/regulatory, not as a _scal measure, as the term could suggest. The rescue fund is implemented in a form of a common reserve fund.

  2. Reduction of Systemic Risk by Means of Pigouvian Taxation.

    Directory of Open Access Journals (Sweden)

    Vinko Zlatić

    Full Text Available We analyze the possibility of reduction of systemic risk in financial markets through Pigouvian taxation of financial institutions, which is used to support the rescue fund. We introduce the concept of the cascade risk with a clear operational definition as a subclass and a network related measure of the systemic risk. Using financial networks constructed from real Italian money market data and using realistic parameters, we show that the cascade risk can be substantially reduced by a small rate of taxation and by means of a simple strategy of the money transfer from the rescue fund to interbanking market subjects. Furthermore, we show that while negative effects on the return on investment (ROI are direct and certain, an overall positive effect on risk adjusted return on investments (ROIRA is visible. Please note that the taxation is introduced as a monetary/regulatory, not as a _scal measure, as the term could suggest. The rescue fund is implemented in a form of a common reserve fund.

  3. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  4. Planning risk communication for UMTRA project groundwater restoration

    Energy Technology Data Exchange (ETDEWEB)

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  5. Planning risk communication for UMTRA project groundwater restoration

    International Nuclear Information System (INIS)

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  6. Risk assessment of underpass infrastructure project based on IS0 31000 and ISO 21500 using fishbone diagram and RFMEA (project risk failure mode and effects analysis) method

    Science.gov (United States)

    Purwanggono, Bambang; Margarette, Anastasia

    2017-12-01

    Completion time of highway construction is very meaningful for smooth transportation, moreover expected number of ownership motor vehicle will increase each year. Therefore, this study was conducted with to analyze the constraints that contained in an infrastructure development project. This research was conducted on Jatingaleh Underpass Project, Semarang. This research was carried out while the project is running, on the implementation, this project is experiencing delays. This research is done to find out what are the constraints that occur in execution of a road infrastructure project, in particular that causes delays. The method that used to find the root cause is fishbone diagram to obtain a possible means of mitigation. Coupled with the RFMEA method used to determine the critical risks that must be addressed immediately on road infrastructure project. The result of data tabulation in this study indicates that the most possible mitigation tool to make a Standard Operating Procedure (SOP) recommendations to disrupt utilities that interfere project implementation. Process of risk assessment has been carried out systematically based on ISO 31000:2009 on risk management and for determination of delayed variables, the requirements of process groups according to ISO 21500:2013 on project management were used.

  7. The integration of the risk in the governance of urban projects: a key issue for a resilient city

    Science.gov (United States)

    Moulin, E.; Deroubaix, J.-F.

    2012-04-01

    (South-East Paris), into a project including residential and office buildings and other amenities. In order to elaborate the master plan, the urban planning authority brought together some flood risk experts. With the remarks of the experts, the architect in charge of the landuse elaborated the master plan taking into account the flood risk; reducing vulnerability of the area and improving the resilience in case of floods, towards a threshold plan. How the experts' recommendations appear in the execution phase? We will show how the project completes or departs from the regulatory policy concerning the drawing up and the implementation of the prevention/protection against flood risk in France. How the vulnerability reduction or the resilience improvement reproduce the regulatory fragmentation, i.e.; on one hand the risk prevention plan and on the other hand the crisis management? We will demonstrate how a resilient approach should mix the several regulatory segments and put the inhabitant in the middle of the urban project thanks to suitable urban forms.

  8. 75 FR 16422 - Plumas National Forest, California, Keddie Ridge Hazardous Fuels Reduction Project

    Science.gov (United States)

    2010-04-01

    ... Hazardous Fuels Reduction Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an... District will prepare and environmental impact statement (EIS) on the Keddie Ridge Hazardous Fuels...: fuels treatments, group selections, road improvements, and herbicide and mechanical applications in the...

  9. Voluntary resettlement in China : policy and outcomes of government-organised poverty reduction projects

    NARCIS (Netherlands)

    Lin, Z.

    2003-01-01

    The primary concern of this research is the justice of using government resources for poverty reduction, in other words investigating whether or not such investment has served its claimed purpose. My central argument is that government organized resettlement projects have

  10. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  11. Risk Reduction with a Fuzzy Expert Exploration Tool

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, William W.; Broadhead, Ron; Sung, Andrew

    2000-10-24

    This project developed an Artificial Intelligence system that drew up on a wide variety of information in providing realistic estimates of risk. ''Fuzzy logic,'' a system of integrating large amounts of inexact, incomplete information with modern computational methods derived usable conclusions, were demonstrated as a cost-effective computational technology in many industrial applications.

  12. A Quantitative Measure For Evaluating Project Uncertainty Under Variation And Risk Effects

    Directory of Open Access Journals (Sweden)

    A. Chenarani

    2017-10-01

    Full Text Available The effects of uncertainty on a project and the risk event as the consequence of uncertainty are analyzed. The uncertainty index is proposed as a quantitative measure for evaluating the uncertainty of a project. This is done by employing entropy as the indicator of system disorder and lack of information. By employing this index, the uncertainty of each activity and its increase due to risk effects as well as project uncertainty changes as a function of time can be assessed. The results are implemented and analyzed for a small turbojet engine development project as the case study. The results of this study can be useful for project managers and other stakeholders for selecting the most effective risk management and uncertainty controlling method.

  13. RISK ASSESSMENT IN PROJECT PLANNING USING FMEA AND CRITICAL PATH METHOD

    Directory of Open Access Journals (Sweden)

    Sandra Milena CHOLES ARVILLA

    2014-10-01

    Full Text Available This paper is based upon the research undertaken for the development of the doctoral thesis “Management of software projects based on object-oriented technology”. The study examines the existing risk management practices commonly used for classic software development. The goal is to integrate the elements of the traditional risk management methodologies to create a new agile risk management methodology. The thesis focuses on techniques that can be easily implemented in extreme programming (XP and SCRUM. This study is motivated by the following research questions: What are the elements of existing quality assurance tools that could meet the principles of agile development? And is it possible to use risk estimation for improving quality in agile projects? The thesis presents a synthesis of the most common risk management techniques, as well as an introduction to agile methods XP and SCRUM. The proposal integrates the concepts of Failure Mode and Effect Analysis into the iterative life cycle of an agile software project. The thesis presents a metamodel which integrates the concepts of agile development methodologies: SCRUM and XP with the FMEA concepts for risk quantification. The model was partly implemented into a real development project. Partial results show the improvement in early identification of failures and allowed to reconsider the Sprint plan.

  14. Social Geology and Landslide Disaster Risk Reduction in Sri Lanka

    Directory of Open Access Journals (Sweden)

    Jayasingha P

    2017-03-01

    Full Text Available AbstractLandslide disaster risk reduction is presently a challenging task facing by Sri Lankangeologists. Increasing trend of population growth in Sri Lanka has adversely affected thestability of central highland due to various human activities. Among them establishment ofhuman settlements and change in land use pattern have become a serious issue in triggeringland instabilities in central highland of the country. National Building Research Oragnisationwhich is the main focal point in land slide disaster risk reduction in Sri Lanka has takenvaluable and timely needed actions including preparation of landslide hazard zonation maps,early warnings and mitigations. Though the landslide is a geological phenomenon, it is highlyinteracted with human societies. Hence managing the issues arising with the landslideoccurrence should be addressed with a sociological approach. This new approach is known asSocio Geological approach which is discussed here.Key words: Landslide, Geology, Socio Geology, Social Geologist

  15. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  16. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  17. Perceived risks in product innovation projects : development of a risk skeleton

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.; Song, X.M.

    1999-01-01

    The essence of undertaking a product innovation project is to create or establish something new. Risk taking is an intrinsic part of that process. In today's markets, with heavy competition, advanced technology and tough economic conditions, successful product innovation has become critically

  18. Risks to coral reefs from ocean carbonate chemistry changes in recent earth system model projections

    International Nuclear Information System (INIS)

    Ricke, K L; Caldeira, K; Orr, J C; Schneider, K

    2013-01-01

    Coral reefs are among the most biodiverse ecosystems in the world. Today they are threatened by numerous stressors, including warming ocean waters and coastal pollution. Here we focus on the implications of ocean acidification for the open ocean chemistry surrounding coral reefs, as estimated from earth system models participating in the Coupled Model Intercomparison Project, Phase 5 (CMIP5). We project risks to reefs in the context of three potential aragonite saturation (Ωa) thresholds. We find that in preindustrial times, 99.9% of reefs adjacent to open ocean in the CMIP5 ensemble were located in regions with Ωa > 3.5. Under a business-as-usual scenario (RCP 8.5), every coral reef considered will be surrounded by water with Ωa 2 emissions abatement, the Ωa threshold for reefs is critical to projecting their fate. Our results indicate that to maintain a majority of reefs surrounded by waters with Ωa > 3.5 to the end of the century, very aggressive reductions in emissions are required. The spread of Ωa projections across models in the CMIP5 ensemble is narrow, justifying a high level of confidence in these results. (letter)

  19. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  20. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  1. Risks Associated with Unconventional Gas Extraction Projects. Induced Seismicity, NORM and Ecological Risks

    International Nuclear Information System (INIS)

    Rodrigo-Naharro, J.; Hurtado, A.; Eguilior, S.; Recreo, F.

    2015-01-01

    The latest technological advances in hydraulic fracturing (fracking) and horizontal drilling are globally driving the commercial extraction of unconventional resources. Although there is still no commercial exploitation of these resources within the EU, the fact that there are potential reserves in some countries, such as Spain, stimulates the need of performing preliminary studies to define the characteristics that an unconventional gas extraction project should consider. The object of these features are the safety of the project, thus minimizing the probabilities of negative environmental impacts, and especially since there is not any EU Framework Directive focusing on the regulation of the operation of such fossil fuels. A project of this nature, involving natural systems, must start from the knowledge of these systems and from an assessment of its features in order to reach the environmental safety of the operations. Moreover, the implementation of risk management systems, along with the existence of an appropriate legislation and supervision are key elements in the development of unconventional gas extraction projects that are environmentally friendly. The present report includes, among the overall risks associated with such projects, those related to: i) the induced seismicity; ii) the Naturally-Occurring Radioactive Materials (NORM); and iii) the ecology.

  2. RISK MANAGEMENT AUTOMATION OF SOFTWARE PROJECTS BASED ОN FUZZY INFERENCE

    Directory of Open Access Journals (Sweden)

    T. M. Zubkova

    2015-09-01

    Full Text Available Application suitability for one of the intelligent methods for risk management of software projects has been shown based on the review of existing algorithms for fuzzy inference in the field of applied problems. Information sources in the management of software projects are analyzed; major and minor risks are highlighted. The most critical parameters have been singled out giving the possibility to estimate the occurrence of an adverse situations (project duration, the frequency of customer’s requirements changing, work deadlines, experience of developers’ participation in such projects and others.. The method of qualitative fuzzy description based on fuzzy logic has been developed for analysis of these parameters. Evaluation of possible situations and knowledge base formation rely on a survey of experts. The main limitations of existing automated systems have been identified in relation to their applicability to risk management in the software design. Theoretical research set the stage for software system that makes it possible to automate the risk management process for software projects. The developed software system automates the process of fuzzy inference in the following stages: rule base formation of the fuzzy inference systems, fuzzification of input variables, aggregation of sub-conditions, activation and accumulation of conclusions for fuzzy production rules, variables defuzzification. The result of risk management automation process in the software design is their quantitative and qualitative assessment and expert advice for their minimization. Practical significance of the work lies in the fact that implementation of the developed automated system gives the possibility for performance improvement of software projects.

  3. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  4. The Fee Sensitive Risk Exposures of Project Authorized Person in Hong Kong

    Directory of Open Access Journals (Sweden)

    Sai-On Cheung

    2012-11-01

    Full Text Available Authorized Persons (AP play a critical role in the design and construction of building works in Hong Kong. Under the Building Ordinance, design and construction of building works need to be coordinated and monitored by an AP registered with the Buildings Department. Professionally qualified Architects, Engineers and Surveyors are eligible to register as AP after completing the prescribed assessment. In addition, the project AP is often appointed by the project owner to be the project team leader. In these capacities, a project AP is exposed to various risks. This paper seeks to identify the fee sensitive risk exposures of project APs. Through an ANOVA study, these risks exposures are those due to liabilities under the Building Ordinance at the construction stage, those towards the third parties and the clients.

  5. Biophysical risks to carbon sequestration and storage in Australian drylands.

    Science.gov (United States)

    Nolan, Rachael H; Sinclair, Jennifer; Eldridge, David J; Ramp, Daniel

    2018-02-15

    Carbon abatement schemes that reduce land clearing and promote revegetation are now an important component of climate change policy globally. There is considerable potential for these schemes to operate in drylands which are spatially extensive. However, projects in these environments risk failure through unplanned release of stored carbon to the atmosphere. In this review, we identify factors that may adversely affect the success of vegetation-based carbon abatement projects in dryland ecosystems, evaluate their likelihood of occurrence, and estimate the potential consequences for carbon storage and sequestration. We also evaluate management strategies to reduce risks posed to these carbon abatement projects. Identified risks were primarily disturbances, including unplanned fire, drought, and grazing. Revegetation projects also risk recruitment failure, thereby failing to reach projected rates of sequestration. Many of these risks are dependent on rainfall, which is highly variable in drylands and susceptible to further variation under climate change. Resprouting vegetation is likely to be less vulnerable to disturbance and have faster recovery rates upon release from disturbance. We conclude that there is a strong impetus for identifying management strategies and risk reduction mechanisms for carbon abatement projects. Risk mitigation would be enhanced by effective co-ordination of mitigation strategies at scales larger than individual abatement project boundaries, and by implementing risk assessment throughout project planning and implementation stages. Reduction of risk is vital for maximising carbon sequestration of individual projects and for reducing barriers to the establishment of new projects entering the market. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314

  7. EDF source term reduction project main outcomes and further developments

    International Nuclear Information System (INIS)

    Ranchoux, Gilles; Bonnefon, Julien; Benfarah, Moez; Wintergerst Matthieu; Gressier, Frederic; Leclercq, Stephanie

    2012-09-01

    The dose reduction is a strategic purpose for EDF in link with the stakes of, nuclear acceptability, respect of regulation and productivity gains. This consists not only in improving the reactor shutdown organization (time spent in control area, biological shielding,...) but also in improving the radiological state of the unit and the efficiency of the source term reduction operations. Since 2003, EDF has been running an innovative project called 'Source Term Reduction' federating the different EDF research and engineering centers in order to: - participate to the long term view about Radiological Protection issues (international feedback analyses), - develop contamination prediction tools (OSCAR software) suitable for the industrial needs (operating units and EPR design), - develop scientific models useful for the understanding of contamination mechanisms to support the strategic decision processes, - carry on with updating and analyzing of contamination measurements feedback in corrosion products (EMECC and CZT campaigns), - carry on with the operational support at short or middle term by optimizing startup and shutdown processes, pre-oxidation or and by improving purification efficiency or material characteristics. This paper will show in a first part the main 2011 results in occupational exposure (collective and individual dose, RCS index...). In a second part, an overview of the main EDF outcomes of the last 3 years in the field of source term reduction will be presented. Future developments extended to contamination issues in EDF NPPs will be also pointed out in this paper. (authors)

  8. Baseline options and greenhouse gas emission reduction of clean development mechanism project in urban solid waste management

    Energy Technology Data Exchange (ETDEWEB)

    Hiramatsu, Ai; Hanaki, K. [Department of Urban Engineering, School of Engineering, University of Tokyo, 7-3-1 Hongo, Bunkyo-ku, Tokyo 113-8656 (Japan); Aramaki, T. [Research Center for Advanced Science and Technology, University of Tokyo, 4-6-1 Komaba, Meguro-ku, Tokyo 153-8904(Japan)

    2003-07-01

    The Clean Development Mechanism (CDM) was adopted in the Kyoto Protocol as a flexibility mechanism to reduce greenhouse gases (GHGs) and has been started with such projects as improving efficiency of individual technology. Although applying various countermeasures to urban areas has significant potentials for reducing GHGs, these countermeasures have not been proposed as CDM projects in the practical stage. A CDM project needs to be validated that it will reduce GHGs additionally compared with a baseline, that is, a predictive value of GHG emissions in the absence of the project. This study examined the introduction of solid waste incineration with electricity generation into three different cities, A, B and C. The main solid waste treatment and the main fuel source are landfill and coal, respectively, in City A, incineration and natural gas in City B, and landfill and hydro in City C. GHG emission reductions of each city under several baseline options assumed here were evaluated. Even if the same technology is introduced, the emission reduction greatly varies according to the current condition and the future plan of the city: 1043-1406 kg CO2/t of waste in City A, 198-580 kg CO2/t in City B, and wide range of zero to over 1000 kg CO2/t in City C. Baseline options also cause significant difference in the emission reduction even in the same city (City C). Incinerating solid waste after removing plastics by source separation in City B increased GHG emission reduction potential up to 730-900 kg CO2/t, which enhances the effectiveness as a CDM project.

  9. NOAA's Joint Polar Satellite System's (JPSS) Proving Ground and Risk Reduction (PGRR) Program - Bringing JPSS Science into Support of Key NOAA Missions!

    Science.gov (United States)

    Sjoberg, W.; McWilliams, G.

    2017-12-01

    This presentation will focus on the continuity of the NOAA Joint Polar Satellite System (JPSS) Program's Proving Ground and Risk Reduction (PGRR) and key activities of the PGRR Initiatives. The PGRR Program was established in 2012, following the launch of the Suomi National Polar Partnership (SNPP) satellite. The JPSS Program Office has used two PGRR Project Proposals to establish an effective approach to managing its science and algorithm teams in order to focus on key NOAA missions. The presenter will provide details of the Initiatives and the processes used by the initiatives that have proven so successful. Details of the new 2017 PGRR Call-for-Proposals and the status of project selections will be discussed.

  10. Geothermal Risk Reduction via Geothermal/Solar Hybrid Power Plants. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Wendt, Daniel [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mines, Greg [Idaho National Lab. (INL), Idaho Falls, ID (United States); Turchi, Craig [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zhu, Guangdong [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-11-01

    are subject to decreasing productivity manifested in the form of decreasing production fluid temperature, flow rate, or both during the life span of the associated power generation project. The impacts of geothermal production fluid temperature decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant efficiency. The impact of resource productivity decline on power generation project economics can be equally detrimental. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below a specified default level. While the magnitude of PPA penalties varies on a case-by-case basis, it is not unrealistic for these penalties to be on the order of the value of the deficit power sales such that the utility may purchase the power elsewhere. This report evaluates the use of geothermal/solar-thermal hybrid plant technology for mitigation of resource productivity decline, which has not been a primary topic of investigation in previous analyses in the open literature.

  11. Decision Model on Financing a Project Using Knowledge about Risk Areas

    OpenAIRE

    Ioana POPOVICI; Emil SCARLAT; Francesco RIZZO

    2011-01-01

    The research presents an alternative to the classical method of measuring financial risk in funding a project. The goal of the model described in the paper implies identifying "risky areas" within the financial balance of the project. The model analysis the financial risk behavior studied along four scenarios by varying only the cost of financing source used according to the specific type of funding. The model introduces the time factor into the analysis of financial risk due to the specific ...

  12. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  13. Risk analysis local grids. Mapping and reduction of risks in electric power grids; Riskanalysmetod lokalnaet. Kartlaeggning och reduktion av risker i elnaet

    Energy Technology Data Exchange (ETDEWEB)

    Kylefors, Martin; Fredholm, Lotta; Sandstroem, Cecilia

    2007-11-15

    The objective of the project has been to contribute to development of risk analysis applications that correspond to the need of investments as an effect of new regulation. The aim has been to develop a method for screening and assessing risks, and for ranking risk reducing measures in order of priority. Phase 1 has consisted of an overview of methods, selection of appropriate methods, and development of principles regarding application suitable for power distribution companies. Phase 2 has consisted of adjustments and tests of the method. The method focuses on risks associated with power failures, with a duration exceeding 12 hours, in medium voltage local networks. Stations are excluded. The suggested method is based on principles of Preliminary Hazard Analysis and Cost-Benefit Analysis. Risks are suggested to be assessed based on three main factors (load, exposure and alternative supply). The quota between the highest and lowest value is 20 for each factor. Each factor is assessed by underlying factors such as type of cable/wire, number of customers and average power consumption. By multiplying the factors a resulting risk level is obtained in the range of 0.05 to 400. The level determines the need for further investments. Appropriate risk reducing measure is selected by putting the risk reduction (benefit) in relation to the total costs for investment and maintenance, for each alternative measure. There is a further need for development of a method for stations. There is also a further need for development of a priority model in city networks where power failures less than 12 hours are taken into account. Finally there is a need to turn the functional requirement (no power failures exceeding 24 hours) into an acceptable risk level

  14. Risk factors for avascular necrosis after closed reduction for developmental dysplasia of the hip.

    Science.gov (United States)

    Schur, Mathew D; Lee, Christopher; Arkader, Alexandre; Catalano, Anthony; Choi, Paul D

    2016-06-01

    The purpose of this study was to identify and evaluate risk factors of avascular necrosis (AVN) after closed treatment for developmental dysplasia of the hip (DDH). A retrospective review of children diagnosed with DDH at a tertiary-care children's hospital between 1986 and 2009 was performed. The presence of AVN was assessed according to Salter's classification system. Eighty-two affected hips in 70 children with an average age of 10 months at closed reduction (range 1-31 months) and 5 years (range 2-19 years) of follow-up met the inclusion criteria. Twenty-nine (of 82, 35 %) affected hips developed AVN. The use of pre-reduction traction (p = 0.019) increased the risk of AVN, while preoperative Pavlik harness or brace trial (p = 0.28), presence of ossific nucleus at the time of closed reduction (p = 0.16), and adductor tenotomy (p = 0.37) were not significant factors. Laterality (right vs. left) was also not a significant risk factor (p = 0.75), but patients who underwent closed reduction for bilateral DDH were less likely to develop AVN (p = 0.027). Overall, the degree of abduction did not affect the rate of AVN (p = 0.87). However, in patients treated with closed reduction younger than 6 months of age, the rate of AVN was increased with abduction ≥50° (9/15, 60 %) compared to abduction AVN were more likely to require subsequent surgery (p = 0.034) and more likely to report a fair/poor clinical outcome (p = 0.049). The risk of AVN (35 %) following closed reduction and spica casting for DDH is high. The degree of abduction in spica casts appears to be a risk factor in patients ≤6 months old. The authors recommend that abduction in spica casts should be limited to <50° in children younger than 6 months of age. IV.

  15. Data base on dose reduction research projects for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Vulin, D.S.; Liang, H.; Baum, J.W. (Brookhaven National Lab., Upton, NY (United States))

    1992-08-01

    This is the fourth volume in a series of reports that provide information on dose reduction research and health physics technology for nuclear power plants. The information is taken from a data base maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. This report presents information on 118 new or updated projects, covering a wide range of activities. Projects including steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section of the report. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Included in this volume is a detailed description of how to access the BNL data bases which store this information. All project abstracts from this report, as well as many other useful documents, can be accessed, with permission, through our on-line system, ACE. A computer equipped with a modem, or a fax machine is all that is required to connect to ACE. Many features of ACE, including software, hardware, and communications specifics, are explained in this report.

  16. Estimating mortality risk reduction and economic benefits from controlling ozone air pollution

    National Research Council Canada - National Science Library

    Committee on Estimating Mortality Risk Reduction Benefits from Decreasing Tropospheric Ozone Exposure

    2008-01-01

    ... in life expectancy, and to assess methods for estimating the monetary value of the reduced risk of premature death and increased life expectancy in the context of health-benefits analysis. Estimating Mortality Risk Reduction and Economic Benefits from Controlling Ozone Air Pollution details the committee's findings and posits several recommendations to address these issues.

  17. Investigating the risk reduction potential of disaster insurance across Europe

    NARCIS (Netherlands)

    Surminski, Swenja; Hudson, Paul

    2017-01-01

    The notion that insurance can play a significant role in risk reduction has recently gained increasing attention in the wake of rising losses from natural disasters. While this notion is accepted in theory, we notice that, in practice, little is known about if and how insurance promotes efforts to

  18. Smartphone Delivery of Mobile HIV Risk Reduction Education

    Directory of Open Access Journals (Sweden)

    Karran A. Phillips

    2013-01-01

    Full Text Available We sought to develop and deploy a video-based smartphone-delivered mobile HIV Risk Reduction (mHIVRR intervention to individuals in an addiction treatment clinic. We developed 3 video modules that consisted of a 10-minute HIVRR video, 11 acceptability questions, and 3 knowledge questions and deployed them as a secondary study within a larger study of ecological momentary and geographical momentary assessments. All 24 individuals who remained in the main study long enough completed the mHIVRR secondary study. All 3 videos met our a priori criteria for acceptability “as is” in the population: they achieved median scores of ≤2.5 on a 5-point Likert scale; ≤20% of the individuals gave them the most negative rating on the scale; a majority of the individuals stated that they would not prefer other formats over video-based smartphone-delivered one (all P<0.05. Additionally, all of our video modules met our a priori criteria for feasibility: ≤20% of data were missing due to participant noncompliance and ≤20% were missing due to technical failure. We concluded that video-based mHIVRR education delivered via smartphone is acceptable, feasible and may increase HIV/STD risk reduction knowledge. Future studies, with pre-intervention assessments of knowledge and random assignment, are needed to confirm these findings.

  19. Resilience and disaster risk reduction: an etymological journey

    Science.gov (United States)

    Alexander, D. E.

    2013-11-01

    This paper examines the development over historical time of the meaning and uses of the term resilience. The objective is to deepen our understanding of how the term came to be adopted in disaster risk reduction and resolve some of the conflicts and controversies that have arisen when it has been used. The paper traces the development of resilience through the sciences, humanities, and legal and political spheres. It considers how mechanics passed the word to ecology and psychology, and how from there it was adopted by social research and sustainability science. As other authors have noted, as a concept, resilience involves some potentially serious conflicts or contradictions, for example between stability and dynamism, or between dynamic equilibrium (homeostasis) and evolution. Moreover, although the resilience concept works quite well within the confines of general systems theory, in situations in which a systems formulation inhibits rather than fosters explanation, a different interpretation of the term is warranted. This may be the case for disaster risk reduction, which involves transformation rather than preservation of the "state of the system". The article concludes that the modern conception of resilience derives benefit from a rich history of meanings and applications, but that it is dangerous - or at least potentially disappointing - to read to much into the term as a model and a paradigm.

  20. The contribution of indigenous knowledge to disaster risk reduction activities in Zimbabwe: A big call to practitioners

    Directory of Open Access Journals (Sweden)

    Ernest Dube

    2018-03-01

    Full Text Available This article examined the contribution of indigenous knowledge to disaster risk reduction activities in Zimbabwe. The current discourse underrates the use of indigenous knowledge of communities by practitioners when dealing with disasters’, as the knowledge is often viewed as outdated and primitive. This study, which was conducted in 2016, sought to examine this problem through analysing the potential contribution of indigenous knowledge as a useful disaster risk reduction intervention. Tsholotsho district in Matabeleland, North province of Zimbabwe, which frequently experiences perennial devastating floods, was used as a case study. Interviews and researcher observations were used to gather data from 40 research participants. The findings were that communities understand weather patterns and could predict imminent flooding after studying trees and clouds, and the behaviours of certain animal species. Local communities also use available local resources to put structural measures in place as part of disaster risk reduction interventions. Despite this important potential, the study found that the indigenous knowledge of disaster risk reduction of the communities is often shunned by practitioners. The practitioners claim that indigenous knowledge lacks documentation, it is not found in all generational classes, it is contextualised to particular communities and the knowledge cannot be scientifically validated. The study concluded that both local communities and disaster risk reduction practitioners can benefit from the indigenous knowledge of communities. This research has the potential to benefit communities, policymakers and disaster risk reduction practitioners.

  1. Risk management of PPP project in the preparation stage based on Fault Tree Analysis

    Science.gov (United States)

    Xing, Yuanzhi; Guan, Qiuling

    2017-03-01

    The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.

  2. Blood Glucose Reduction by Diabetic Drugs with Minimal Hypoglycemia Risk for Cardiovascular Outcomes

    DEFF Research Database (Denmark)

    Huang, Chi-Jung; Wang, Wei-Ting; Sung, Shih-Hsien

    2018-01-01

    of antidiabetic drugs with less hypoglycemia risk were comprehensively searched in MEDLINE, Embase, and the Cochrane Library up to January 27, 2018. Mixed-effects meta-regression analysis was conducted to explore the relationship between haemoglobin A1c (HbA1c) reduction and the risk of major adverse...... concentration was 0.42% lower (median, 0.27-0.86%) for participants given antihyperglycemic agents than those given placebo. The meta-regression analysis demonstrated that HbA1c reduction was significantly associated with a decreased risk of MACE (β value, -0.39 to -0.55; P...-40%) for MACE. By contrast, the meta-regression analysis for trials using conventional agents failed to demonstrate a significant relationship between achieved HbA1c difference and MACE risk (P>0.74). CONCLUSIONS: Compared with placebo, newer T2D agents with less hypoglycemic hazard significantly reduced...

  3. Can I Count on Getting Better? Association between Math Anxiety and Poorer Understanding of Medical Risk Reductions.

    Science.gov (United States)

    Rolison, Jonathan J; Morsanyi, Kinga; O'Connor, Patrick A

    2016-10-01

    Lower numerical ability is associated with poorer understanding of health statistics, such as risk reductions of medical treatment. For many people, despite good numeracy skills, math provokes anxiety that impedes an ability to evaluate numerical information. Math-anxious individuals also report less confidence in their ability to perform math tasks. We hypothesized that, independent of objective numeracy, math anxiety would be associated with poorer responding and lower confidence when calculating risk reductions of medical treatments. Objective numeracy was assessed using an 11-item objective numeracy scale. A 13-item self-report scale was used to assess math anxiety. In experiment 1, participants were asked to interpret the baseline risk of disease and risk reductions associated with treatment options. Participants in experiment 2 were additionally provided a graphical display designed to facilitate the processing of math information and alleviate effects of math anxiety. Confidence ratings were provided on a 7-point scale. Individuals of higher objective numeracy were more likely to respond correctly to baseline risks and risk reductions associated with treatment options and were more confident in their interpretations. Individuals who scored high in math anxiety were instead less likely to correctly interpret the baseline risks and risk reductions and were less confident in their risk calculations as well as in their assessments of the effectiveness of treatment options. Math anxiety predicted confidence levels but not correct responding when controlling for objective numeracy. The graphical display was most effective in increasing confidence among math-anxious individuals. The findings suggest that math anxiety is associated with poorer medical risk interpretation but is more strongly related to confidence in interpretations. © The Author(s) 2015.

  4. Breast Cancer Incidence and Risk Reduction in the Hispanic Population.

    Science.gov (United States)

    Power, Eric J; Chin, Megan L; Haq, Mohamed M

    2018-02-26

    Breast cancer is the most common non-skin cancer amongst women worldwide and is the fifth leading cause of cancer-related mortality overall. It is also the foremost reason for cancer-related mortality in Hispanic females in the United States (US). Although the current incidence of breast cancer is significantly lower in Hispanics compared to that of non-Hispanic Whites (NHW) and Blacks, (91.9, 128.1, and 124.3 per 100,000, respectively, annually), this may increase if Hispanics develop similar lifestyle behaviors to other American women, in categories such as weight management, age at first birth, number of children, and breastfeeding habits. Stage-for-stage mortality for Hispanics is similar to NHWs, but the mortality rate is not declining as rapidly in this ethnic group. Hispanic women share many of the same risk factors for developing breast cancer as NHWs and Blacks. This suggests that many of the risk reduction strategies used in other racial populations may also benefit this group. Providing education about breast cancer and implementing risk reduction strategies in culturally-aware environments could help keep incidence low and reduce cancer-related mortality. Since Hispanics are the largest minority group in the US, this could have a significant impact on the incidence and mortality nationally.

  5. Health risk reduction programs in employer-sponsored health plans: Part II-law and ethics.

    Science.gov (United States)

    Rothstein, Mark A; Harrell, Heather L

    2009-08-01

    We sought to examine the legal and ethical implications of workplace health risk reduction programs (HRRPs) using health risk assessments, individually focused risk reduction, and financial incentives to promote compliance. We conducted a literature review, analyzed relevant statutes and regulations, and considered the effects of these programs on employee health privacy. A variety of laws regulate HRRPs, and there is little evidence that employer-sponsored HRRPs violate these provisions; infringement on individual health privacy is more difficult to assess. Although current laws permit a wide range of employer health promotion activities, HRRPs also may entail largely unquantifiable costs to employee privacy and related interests.

  6. Health Risk Reduction Programs in Employer-Sponsored Health Plans: Part II—Law and Ethics

    Science.gov (United States)

    Rothstein, Mark A.; Harrell, Heather L.

    2011-01-01

    Objective We sought to examine the legal and ethical implications of workplace health risk reduction programs (HRRPs) using health risk assessments, individually focused risk reduction, and financial incentives to promote compliance. Methods We conducted a literature review, analyzed relevant statutes and regulations, and considered the effects of these programs on employee health privacy. Results A variety of laws regulate HRRPs, and there is little evidence that employer-sponsored HRRPs violate these provisions; infringement on individual health privacy is more difficult to assess. Conclusion Although current laws permit a wide range of employer health promotion activities, HRRPs also may entail largely unquantifiable costs to employee privacy and related interests. PMID:19625971

  7. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  8. Walking versus running for hypertension, cholesterol, and diabetes mellitus risk reduction.

    Science.gov (United States)

    Williams, Paul T; Thompson, Paul D

    2013-05-01

    To test whether equivalent energy expenditure by moderate-intensity (eg, walking) and vigorous-intensity exercise (eg, running) provides equivalent health benefits. We used the National Runners' (n=33 060) and Walkers' (n=15 945) Health Study cohorts to examine the effect of differences in exercise mode and thereby exercise intensity on coronary heart disease (CHD) risk factors. Baseline expenditure (metabolic equivant hours per day [METh/d]) was compared with self-reported, physician-diagnosed incident hypertension, hypercholesterolemia, diabetes mellitus, and CHD during 6.2 years follow-up. Running significantly decreased the risks for incident hypertension by 4.2% (Pdiabetes mellitus by 12.1% (Phypertension; and (3) 43.5%, 44.1%, 47.7%, and 68.2% from running, and 34.1%, 44.2% and 23.6% from walking for diabetes mellitus (walking >5.4 METh/d excluded for too few cases). The risk reductions were not significantly different for running than walking for diabetes mellitus (P=0.94), hypertension (P=0.06), or CHD (P=0.26), and only marginally greater for walking than running for hypercholesterolemia (P=0.04). Equivalent energy expenditures by moderate (walking) and vigorous (running) exercise produced similar risk reductions for hypertension, hypercholesterolemia, diabetes mellitus, and possibly CHD.

  9. Evaluating Sources of Risks in Large Engineering Projects: The Roles of Equivocality and Uncertainty

    Directory of Open Access Journals (Sweden)

    Leena Pekkinen

    2015-11-01

    Full Text Available Contemporary project risk management literature introduces uncertainty, i.e., the lack of information, as a fundamental basis of project risks. In this study the authors assert that equivocality, i.e., the existence of multiple and conflicting interpretations, can also serve as a basis of risks. With an in-depth empirical investigation of a large complex engineering project the authors identified risk sources having their bases in the situations where uncertainty or equivocality was the predominant attribute. The information processing theory proposes different managerial practices for risk management based on the sources of risks in uncertainty or equivocality.

  10. Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

    OpenAIRE

    O. Badagadze; G. Sirbiladze; I. Khutsishvili

    2014-01-01

    The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

  11. Risks and opportunities management on laser Megajoule project: the development of a new knowledge

    International Nuclear Information System (INIS)

    Delafosse-Le Ber, H.; Deysson, St.; Briault, S.

    2004-01-01

    The interest of these six years spent to build the management through the Risks and the Opportunities (R and O) approach on the project Megajoule Laser as well did not hold with the practical application of a method as to the installation of a formal culture and to its evolution in time. This culture, it had to be progressively founded within a mainly technical project team. More qualitative with most quantitative aspects, the putting into practice of the R and O approach on project LMJ knew all the degrees of evolution and precision. The starting of the project saw being born the first analysis of its 'Project Risk' with a series of interviews, carried out by the Quality Manager at the time. This analysis took the shape of a technical item lists, which are identified in an empirical way. Then, some brainstorming meeting were led under the responsibility of the Technical Coordinator (which is the Project Manager assistant) in order to identify and to evaluate the 'Project Risk' on a qualitative way, but always keeping a strong technical connotation. The methodological reference of the 'Project Risk' was outlined taking into account the DGA AQ 923 without directly interaction with the other project processes (for example, the cost, the deadlines and the performance management). Initially, the project developed an Access database, which allows the storing of the risk files. Unfortunately, this database is isolated from the other project management data processing tools. In the second time, the project decided to obtain a dedicated organisation, hierarchically independent from the technical managers but however integrated into the project and attached to the assistant of the Control Project Manager. This organisation being called 'Risks and Opportunities Team', when the management of the opportunities supplemented the R and O approach. This team combines today the individual interviews and the Working Groups in order to identify and to evaluate the effects of the R

  12. Smoke and mirrors: Limited value of relative risk reductions for assessing the benefits of disease-modifying therapies for multiple sclerosis.

    Science.gov (United States)

    Zakaria, Magd

    2015-05-01

    A reduction in relapse rate is the main primary outcome in most clinical trials in patients with multiple sclerosis (MS), with the effect of a treatment commonly expressed as relative risk reduction for this outcome. Physicians often assume that a drug with a higher relative risk reduction demonstrated in one trial is more effective than a drug with a lower relative risk reduction in another, and may pass this idea on to younger physicians and to patients. The use of the relative risk reduction as a measure of drug efficacy can be misleading, as it depends on the nature of the population studied: a treatment effect characterized by a lower relative risk reduction may be more clinically meaningful than one with a higher relative risk reduction. This concept is especially important with regard to clinical trials in patients with MS, where relapse rates in placebo groups have been declining in recent decades. Direct, head-to-head comparisons are the only way to compare the efficacy of the different treatments for MS. Copyright © 2015 Elsevier B.V. All rights reserved.

  13. The Process of Risk Management for a Project to Extract Shale Gas

    Energy Technology Data Exchange (ETDEWEB)

    Hurtado, A.; Eguilior, S.; Recreo, F.

    2014-07-01

    There is no human activity without risk. Accordingly, so neither is the extraction of shale gas. In fact this technology has a risk level similar to any other type of industrial activity and particularly those related to oil and gas industry. It is important to highlight the need to properly address these risks, among other reasons, for its influence on public acceptance of this technology, a key element for the commercial scale implementation. At present, risk management is a generally accepted tool for decision making and control of the risks that come from a wide variety of both industrial and not industrial human activities. It is an important element for the implementation of a large number of safety regulations, corporate policies and good industry practice . Thus, for example, chemical and petroleum, nuclear industries, aviation and aerospace or waste management make use of risk management as a central tool to identification the risks, to establish the importance and ranking of the estimated risks, to estimate the cost/benefit ratio in reducing these risks, and to carry out political and institutional processes to manage them. Risk management provides a broad framework to aid decision-making through the identification, analysis, and evaluation and control of risks, including, of course, those for health and safety. A key aspect is the need to ensure the identification of all significant risks, from which it may take appropriate measures (risk analysis). An unidentified risk allows or evaluation or its monitoring, reduction, acceptance or cancellation. After the analysis stage it may be considered for assessment, that is, the risk quantification, to classify them (acceptable, unacceptable, etc. risk). These actions are determined based on a balance between risk control strategies, their effectiveness and cost, and the needs, problems and concerns of those who may be affected, or stake holders, an essential element in the strategic planning of any activity or

  14. The Process of Risk Management for a Project to Extract Shale Gas

    International Nuclear Information System (INIS)

    Hurtado, A.; Eguilior, S.; Recreo, F.

    2014-01-01

    There is no human activity without risk. Accordingly, so neither is the extraction of shale gas. In fact this technology has a risk level similar to any other type of industrial activity and particularly those related to oil and gas industry. It is important to highlight the need to properly address these risks, among other reasons, for its influence on public acceptance of this technology, a key element for the commercial scale implementation. At present, risk management is a generally accepted tool for decision making and control of the risks that come from a wide variety of both industrial and not industrial human activities. It is an important element for the implementation of a large number of safety regulations, corporate policies and good industry practice . Thus, for example, chemical and petroleum, nuclear industries, aviation and aerospace or waste management make use of risk management as a central tool to identification the risks, to establish the importance and ranking of the estimated risks, to estimate the cost/benefit ratio in reducing these risks, and to carry out political and institutional processes to manage them. Risk management provides a broad framework to aid decision-making through the identification, analysis, and evaluation and control of risks, including, of course, those for health and safety. A key aspect is the need to ensure the identification of all significant risks, from which it may take appropriate measures (risk analysis). An unidentified risk allows or evaluation or its monitoring, reduction, acceptance or cancellation. After the analysis stage it may be considered for assessment, that is, the risk quantification, to classify them (acceptable, unacceptable, etc. risk). These actions are determined based on a balance between risk control strategies, their effectiveness and cost, and the needs, problems and concerns of those who may be affected, or stake holders, an essential element in the strategic planning of any activity or

  15. Valuing Mortality Risk Reductions for Environmental Policy: A White Paper (1999)

    Science.gov (United States)

    This white paper addresses current and recent U.S. EPA practices regarding the valuation of mortality risk reductions, focusing especially on empirical estimates of the “value of a statistical life” (VSL) from stated preference and hedonic wage studies.

  16. Relationships Between Risks in an IT Project Development Portfolio

    NARCIS (Netherlands)

    Kusters, R.J.; Postema, J.J.; Trienekens, J.J.M.; Lavazza, L.; Oberhauser, R.; Martin, A.; Hassine, J.; Gebhart, M.; Jäntti, M.

    2013-01-01

    More and more it is seen that IT (Information Technology) projects are managed as a whole as part of a IT project portfolio. As one of the arguments for doing so, risk management at the portfolio level was identified as one of the advantages that could benefit from this. This was based on the notion

  17. MANAGEMENT OF TRANSURANIC (TRU) WASTE RETRIEVAL PROJECT RISKS SUCCESSES IN THE STARTUP OF THE HANFORD 200 AREA TRU WASTE RETRIEVAL PROJECT

    International Nuclear Information System (INIS)

    GREENWLL, R.D.

    2005-01-01

    A risk identification and mitigation method applied to the Transuranic (TRU) Waste Retrieval Project performed at the Hanford 200 Area burial grounds is described. Retrieval operations are analyzed using process flow diagramming. and the anticipated project contingencies are included in the Authorization Basis and operational plans. Examples of uncertainties assessed include degraded container integrity, bulged drums, unknown containers, and releases to the environment. Identification and mitigation of project risks contributed to the safe retrieval of over 1700 cubic meters of waste without significant work stoppage and below the targeted cost per cubic meter retrieved. This paper will be of interest to managers, project engineers, regulators, and others who are responsible for successful performance of waste retrieval and other projects with high safety and performance risks

  18. The effectiveness of coral reefs for coastal hazard risk reduction and adaptation

    Science.gov (United States)

    Ferrario, Filippo; Beck, Michael W.; Storlazzi, Curt D.; Micheli, Fiorenza; Shepard, Christine C.; Airoldi, Laura

    2014-01-01

    The world’s coastal zones are experiencing rapid development and an increase in storms and flooding. These hazards put coastal communities at heightened risk, which may increase with habitat loss. Here we analyse globally the role and cost effectiveness of coral reefs in risk reduction. Meta-analyses reveal that coral reefs provide substantial protection against natural hazards by reducing wave energy by an average of 97%. Reef crests alone dissipate most of this energy (86%). There are 100 million or more people who may receive risk reduction benefits from reefs or bear hazard mitigation and adaptation costs if reefs are degraded. We show that coral reefs can provide comparable wave attenuation benefits to artificial defences such as breakwaters, and reef defences can be enhanced cost effectively. Reefs face growing threats yet there is opportunity to guide adaptation and hazard mitigation investments towards reef restoration to strengthen this first line of coastal defence.

  19. Effectiveness of a fall-risk reduction programme for inpatient rehabilitation after stroke.

    Science.gov (United States)

    Goljar, Nika; Globokar, Daniel; Puzić, Nataša; Kopitar, Natalija; Vrabič, Maja; Ivanovski, Matic; Vidmar, Gaj

    2016-09-01

    To evaluate effectiveness of fall-risk-assessment-based fall prevention for stroke rehabilitation inpatients. A consecutive series of 232 patients admitted for the first time to a subacute stroke-rehabilitation ward during 2010-2011 was studied in detail. The Assessment Sheet for Fall Prediction in Stroke Inpatients (ASFPSI by Nakagawa et al.) was used to assess fall-risk upon admission. Association of ASFPSI score and patient characteristics with actual falls was statistically tested. Yearly incidence of falls per 1000 hospital days (HD) was retrospectively audited for the 2006-2014 period to evaluate effectiveness of fall-risk reduction measures. The observed incidence of falls over the detailed-study-period was 3.0/1000 HD; 39% of the fallers fell during the first week after admission. ASFPSI score was not significantly associated with falls. Longer hospital stay, left body-side affected and non-extreme FIM score (55-101) were associated with higher odds of fall. Introduction of fall-risk reduction measures followed by compulsory fall-risk assessment lead to incidence of falls dropping from 7.1/1000 HD in 2006 to 2.8/1000 HD in 2011 and remaining at that level until 2014. The fall-risk-assessment-based measures appear to have led to decreasing falls risk among post-stroke rehabilitation inpatients classified as being at high risk of falls. The fall prevention programme as a whole was successful. Patients with non-extreme level of functional independence should receive enhanced fall prevention. Implications for Rehabilitation Recognising the fall risk upon the patient's admission is essential for preventing falls in rehabilitation wards. Assessing the fall risk is a team tasks and combines information from various sources. Assessing fall risk in stroke patients using the assessment sheet by Nakagawa et al. immediately upon admission systematically draws attention to the risk of falls in each individual patient.

  20. Risk Management Affecting IS/IT Project Success Through Communicative Action

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    Project risk management is defined in the literature as being instrumental action based on rational problem solving. Research indicates limited positive effects of an exclusive focus of instrumental action on project success. This article proposes to extend this instrumental view through

  1. Towards improved public awareness for climate related disaster risk reduction in South Africa: A Participatory Development Communication perspective

    Directory of Open Access Journals (Sweden)

    Tigere Chagutah

    2009-04-01

    Full Text Available Southern Africa has frequently been struck by damaging climate hazards which increasingly continue to threaten sustainable development efforts. Ominously, climate models predict that the incidence of major ‘wet’ events, such as floods and cyclones will increase in frequency against the background of a changing climate. Unfortunately, local mechanisms for communicating and raising public awareness of the consequent risks and appropriate risk reduction options remain weak. At the core of policy responses to the threat posed by climate related hazards, the South African government has adopted a disaster risk reduction approach to disaster management. This article details how, among many other measures to limit the adverse impacts of natural hazards, South Africa’s National Disaster Management Framework calls for the implementation of effective public awareness activities to increase the knowledge among communities of the risks they face and what risk-minimising actions they can take. Emphasis is laid on the importance of information provision and knowledge building among at-risk communities. Citing established theories and strategies, the author proposes a participatory development communication approach through Development Support Communication strategies for the provision of disaster risk reduction public awareness activities by government and other disaster risk reduction role-players in South Africa. By way of a review of completed studies and literature, the article provides guidance on the planning and execution of successful public communication campaigns and also discusses the constraints of communication campaigns as an intervention for comprehensive disaster risk reduction.

  2. Integrated health and environmental risk assessment and risk management in large industrial areas. Case study Zagreb (CSZ). Final report for 1992

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-07-01

    This report is the result of the Phase 1 of the research within the Case Study Zagreb co-financed by the IAEA according to the project YUG/9/029. The basic long term aim of the project is the reduction in hazards to human health and to the environment in the area of Zagreb. This project is about risk assessment and risk management to achieve the environment protection goals.

  3. Integrated health and environmental risk assessment and risk management in large industrial areas. Case study Zagreb (CSZ). Final report for 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report is the result of the Phase 1 of the research within the Case Study Zagreb co-financed by the IAEA according to the project YUG/9/029. The basic long term aim of the project is the reduction in hazards to human health and to the environment in the area of Zagreb. This project is about risk assessment and risk management to achieve the environment protection goals

  4. Differences in flood hazard projections in Europe – their causes and consequences for decision making

    Science.gov (United States)

    Kundzewicz, Z. W.; Krysanova, V.; Dankers, R.; Hirabayashi, Y.; Kanae, S.; Hattermann, F. F.; Huang, S.; Milly, Paul C.D.; Stoffel, M.; Driessen, P.P.J.; Matczak, P.; Quevauviller, P.; Schellnhuber, H.-J.

    2017-01-01

    This paper interprets differences in flood hazard projections over Europe and identifies likely sources of discrepancy. Further, it discusses potential implications of these differences for flood risk reduction and adaptation to climate change. The discrepancy in flood hazard projections raises caution, especially among decision makers in charge of water resources management, flood risk reduction, and climate change adaptation at regional to local scales. Because it is naïve to expect availability of trustworthy quantitative projections of future flood hazard, in order to reduce flood risk one should focus attention on mapping of current and future risks and vulnerability hotspots and improve the situation there. Although an intercomparison of flood hazard projections is done in this paper and differences are identified and interpreted, it does not seems possible to recommend which large-scale studies may be considered most credible in particular areas of Europe.

  5. Risk reduction and TQM: A corporate culture of continuous improvement

    International Nuclear Information System (INIS)

    Nau, D.C.

    1992-01-01

    A company supplying products and services to the nuclear industry that implements a cultural commitment to continuous improvement, in addition to providing higher quality products and services, also represents a significant reduction in operational risk to that industry. The implementation of a culture of total quality management (TQM), initiated by Sorrento Electronics (SE) in 1989, involves total commitment to the basic TQM principles: continuous improvement, people performing the work are the best sources of how to do it better, and employees must be empowered to make the improvements. What this means to the nuclear industry is a significant reduction in operational risk through: (1) products based on simpler, standardized, proven designs with established operational track records, enhancing confidence that they will perform as expected; (2) the highest confidence that products and supporting documentation are delivered with zero defects; (3) critical power plant schedules can be supported through the shortest possible equipment delivery times; (4) highly motivated employees with extremely positive attitudes, working together in cross-functional teams, virtually eliminate the possibility of deliberate product tampering or sabotage

  6. Reducing Risk for the Next Generation Nuclear Plant

    Energy Technology Data Exchange (ETDEWEB)

    John M. Beck II; Harold J. Heydt; Emmanuel O. Opare; Kyle B. Oswald

    2010-07-01

    The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project. Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.

  7. Reducing Risk for the Next Generation Nuclear Plant

    International Nuclear Information System (INIS)

    Beck, John M. II; Heydt, Harold J.; Opare, Emmanuel O.; Oswald, Kyle B.

    2010-01-01

    The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project. Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.

  8. The effect of risk perception on public preferences and willingness to pay for reductions in the health risks posed by toxic cyanobacterial blooms.

    Science.gov (United States)

    Hunter, Peter D; Hanley, Nick; Czajkowski, Mikołaj; Mearns, Kathryn; Tyler, Andrew N; Carvalho, Laurence; Codd, Geoffrey A

    2012-06-01

    Mass populations of toxin-producing cyanobacteria are an increasingly common occurrence in inland and coastal waters used for recreational purposes. These mass populations pose serious risks to human and animal health and impose potentially significant economic costs on society. In this study, we used contingent valuation (CV) methods to elicit public willingness to pay (WTP) for reductions in the morbidity risks posed by blooms of toxin-producing cyanobacteria in Loch Leven, Scotland. We found that 55% of respondents (68% excluding protest voters) were willing to pay for a reduction in the number of days per year (from 90, to either 45 or 0 days) that cyanobacteria pose a risk to human health at Loch Leven. The mean WTP for a risk reduction was UK£9.99-12.23/household/year estimated using a logistic spike model. In addition, using the spike model and a simultaneous equations model to control for endogeneity bias, we found the respondents' WTP was strongly dependent on socio-demographic characteristics, economic status and usage of the waterbody, but also individual-specific attitudes and perceptions towards health risks. This study demonstrates that anticipated health risk reductions are an important nonmarket benefit of improving water quality in recreational waters and should be accounted for in future cost-benefit analyses such as those being undertaken under the auspices of the European Union's Water Framework Directive, but also that such values depend on subjective perceptions of water-related health risks and general attitudes towards the environment. Copyright © 2012 Elsevier B.V. All rights reserved.

  9. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  10. 76 FR 22668 - Shasta-Trinity National Forest; California; I-5 Corridor Fuels Reduction Project

    Science.gov (United States)

    2011-04-22

    ... environmental impact statement. SUMMARY: The Shasta Unit of the Shasta-Trinity National Forest is proposing a hazardous fuels treatment project to reduce the risk of life, property and resource values from a high... 20,025 acres of the project area is proposed for treatment. Treatment methods include prescribe fire...

  11. Disaster Risk Reduction through school learners’ awareness and preparedness

    Directory of Open Access Journals (Sweden)

    Takalani S. Rambau

    2012-11-01

    Full Text Available In 2006, the ISDR (International Strategy for Disaster Reduction (2007 initiated a campaign called Disaster Risk Reduction Begins at School to encourage the integration of disaster risk education into school curricula in countries vulnerable to disasters. A study was initiated to determine how education, in particular curriculum development and teaching, contributes to South African learners’ hazard awareness and disaster preparedness. Mixed method research (consisting of questionnaires, interviews and document reviews was done to collect data. 150 educators from Gauteng, the Western Cape, KwaZulu-Natal, North West and the Eastern Cape completed questionnaires. Five curriculum coordinators, three disaster specialists and two disaster lecturers were interviewed to record their perspectives. The first finding of the study was that the majority of educators, disaster specialists and curriculum coordinators identified floods, fire, droughts, epidemics, road accidents and storms as the most prevalent disasters in the country. The second finding from the literature and empirical data collection revealed that South African communities, particularly people residing in informal settlements and other poor areas, are more vulnerable to disasters than their counterparts in more affluent areas. The third finding of the study was that teaching learners about hazards and disasters is vital and must be expanded.

  12. Preferences for breast cancer risk reduction among BRCA1/BRCA2 mutation carriers: a discrete-choice experiment.

    Science.gov (United States)

    Liede, Alexander; Mansfield, Carol A; Metcalfe, Kelly A; Price, Melanie A; Snyder, Carrie; Lynch, Henry T; Friedman, Sue; Amelio, Justyna; Posner, Joshua; Narod, Steven A; Lindeman, Geoffrey J; Evans, D Gareth

    2017-09-01

    Unaffected women who carry BRCA1 or BRCA2 mutations face difficult choices about reducing their breast cancer risk. Understanding their treatment preferences could help us improve patient counseling and inform drug trials. The objective was to explore preferences for various risk-reducing options among women with germline BRCA1/2 mutations using a discrete-choice experiment survey and to compare expressed preferences with actual behaviors. A discrete-choice experiment survey was designed wherein women choose between hypothetical treatments to reduce breast cancer risk. The hypothetical treatments were characterized by the extent of breast cancer risk reduction, treatment duration, impact on fertility, hormone levels, risk of uterine cancer, and ease and mode of administration. Data were analyzed using a random-parameters logit model. Women were also asked to express their preference between surgical and chemoprevention options and to report on their actual risk-reduction actions. Women aged 25-55 years with germline BRCA1/2 mutations who were unaffected with breast or ovarian cancer were recruited through research registries at five clinics and a patient advocacy group. Between January 2015 and March 2016, 622 women completed the survey. Breast cancer risk reduction was the most important consideration expressed, followed by maintaining fertility. Among the subset of women who wished to have children in future, the ability to maintain fertility was the most important factor, followed by the extent of risk reduction. Many more women said they would take a chemoprevention drug than had actually taken chemoprevention. Women with BRCA1/2 mutations indicated strong preferences for breast cancer risk reduction and maintaining fertility. The expressed desire to have a safe chemoprevention drug available to them was not met by current chemoprevention options.

  13. MARR project risk matrices in radiotherapy; Proyecto MARR: matrices de riesgo en radioterapia

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez, M. L.; Perez Mulas, A.; Vilanova, J.; Prieto, C.; Delgado, J. M.; Alvarez, C.; Rodriguez, M.

    2014-07-01

    Radiotherapy is a complex process not without risk for the patient. The Council de Nuclear Safety (CSN), based on its cooperation with the health authorities regarding radiation protection of patient is promoting, through the project MARR, (Risk matrix in radiotherapy) the risk analysis in the radiotherapy departments of our country. This project represents the extension of methodologies applied in the nuclear sector other radiological practices. The aim is to share, with professional societies, the knowledge acquired by the CSN during its participation in the Ibero-American Forum of regulators (Forum) projects. (Author)

  14. A practical approach to assess depression risk and to guide risk reduction strategies in later life.

    Science.gov (United States)

    Almeida, Osvaldo P; Alfonso, Helman; Pirkis, Jane; Kerse, Ngaire; Sim, Moira; Flicker, Leon; Snowdon, John; Draper, Brian; Byrne, Gerard; Goldney, Robert; Lautenschlager, Nicola T; Stocks, Nigel; Scazufca, Marcia; Huisman, Martijn; Araya, Ricardo; Pfaff, Jon

    2011-03-01

    Many factors have been associated with the onset and maintenance of depressive symptoms in later life, although this knowledge is yet to be translated into significant health gains for the population. This study gathered information about common modifiable and non-modifiable risk factors for depression with the aim of developing a practical probabilistic model of depression that can be used to guide risk reduction strategies. A cross-sectional study was undertaken of 20,677 community-dwelling Australians aged 60 years or over in contact with their general practitioner during the preceding 12 months. Prevalent depression (minor or major) according to the Patient Health Questionnaire (PHQ-9) assessment was the main outcome of interest. Other measured exposures included self-reported age, gender, education, loss of mother or father before age 15 years, physical or sexual abuse before age 15 years, marital status, financial stress, social support, smoking and alcohol use, physical activity, obesity, diabetes, hypertension, and prevalent cardiovascular diseases, chronic respiratory diseases and cancer. The mean age of participants was 71.7 ± 7.6 years and 57.9% were women. Depression was present in 1665 (8.0%) of our subjects. Multivariate logistic regression showed depression was independently associated with age older than 75 years, childhood adverse experiences, adverse lifestyle practices (smoking, risk alcohol use, physical inactivity), intermediate health hazards (obesity, diabetes and hypertension), comorbid medical conditions (clinical history of coronary heart disease, stroke, asthma, chronic obstructive pulmonary disease, emphysema or cancers), and social or financial strain. We stratified the exposures to build a matrix that showed that the probability of depression increased progressively with the accumulation of risk factors, from less than 3% for those with no adverse factors to more than 80% for people reporting the maximum number of risk factors. Our

  15. A text message intervention for alcohol risk reduction among community college students: TMAP.

    Science.gov (United States)

    Bock, Beth C; Barnett, Nancy P; Thind, Herpreet; Rosen, Rochelle; Walaska, Kristen; Traficante, Regina; Foster, Robert; Deutsch, Chris; Fava, Joseph L; Scott-Sheldon, Lori A J

    2016-12-01

    Students at community colleges comprise nearly half of all U.S. college students and show higher risk of heavy drinking and related consequences compared to students at 4-year colleges, but no alcohol safety programs currently target this population. To examine the feasibility, acceptability, and preliminary efficacy of an alcohol risk-reduction program delivered through text messaging designed for community college (CC) students. Heavy drinking adult CC students (N=60) were enrolled and randomly assigned to the six-week active intervention (Text Message Alcohol Program: TMAP) or a control condition of general motivational (not alcohol related) text messages. TMAP text messages consisted of alcohol facts, strategies to limit alcohol use and related risks, and motivational messages. Assessments were conducted at baseline, week 6 (end of treatment) and week 12 (follow up). Most participants (87%) completed all follow up assessments. Intervention messages received an average rating of 6.8 (SD=1.5) on a 10-point scale. At week six, TMAP participants were less likely than controls to report heavy drinking and negative alcohol consequences. The TMAP group also showed significant increases in self-efficacy to resist drinking in high risk situations between baseline and week six, with no such increase among controls. Results were maintained through the week 12 follow up. The TMAP alcohol risk reduction program was feasible and highly acceptable indicated by high retention rates through the final follow up assessment and good ratings for the text message content. Reductions in multiple outcomes provide positive indications of intervention efficacy. Copyright © 2016. Published by Elsevier Ltd.

  16. Managing the risks of a large-scale infrastructure project : The case of Spoorzone Delft

    NARCIS (Netherlands)

    Priemus, H.

    2012-01-01

    Risk management in large-scale infrastructure projects is attracting the attention of academics and practitioners alike. After a brief summary of the theoretical background, this paper describes how the risk analysis and risk management shaped up in a current large-scale infrastructure project in

  17. Possibilities for reduction of transverse projected emittances by partial removal of transverse to longitudinal beam correlations

    International Nuclear Information System (INIS)

    Balandin, V.; Decking, W.; Golubeva, N.

    2014-09-01

    We show that if in the particle beam there are linear correlations between energy of particles and their transverse positions and momenta (linear beam dispersions), then the transverse projected emittances always can be reduced by letting the beam to pass through magnetostatic system with specially chosen nonzero lattice dispersions. The maximum possible reduction of the transverse projected emittances occurs when all beam dispersions are zeroed, and the values of the lattice dispersions required for that are completely defined by the values of the beam dispersions and the beam rms energy spread and are independent from any other second-order central beam moments. Besides that, we prove that, alternatively, one can also use the lattice dispersions to remove linear correlations between longitudinal positions of particles and their transverse coordinates (linear beam tilts), but in this situation solution for the lattice dispersions is nonunique and the reduction of the transverse projected emittances is not guaranteed.

  18. Theoretical framework to study exercise motivation for breast cancer risk reduction.

    Science.gov (United States)

    Wood, Maureen E

    2008-01-01

    To identify an appropriate theoretical framework to study exercise motivation for breast cancer risk reduction among high-risk women. An extensive review of the literature was conducted to gather relevant information pertaining to the Health Promotion Model, self-determination theory, social cognitive theory, Health Belief Model, Transtheoretical Model, theory of planned behavior, and protection motivation theory. An iterative approach was used to summarize the literature related to exercise motivation within each theoretical framework. Protection motivation theory could be used to examine the effects of perceived risk and self-efficacy in motivating women to exercise to facilitate health-related behavioral change. Evidence-based research within a chosen theoretical model can aid practitioners when making practical recommendations to reduce breast cancer risk.

  19. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  20. Methodology evaluation of innovative projects under risk and uncertainty

    Directory of Open Access Journals (Sweden)

    2012-09-01

    Full Text Available This article deals with problems connected with the assessment of innovative projects in the context of risk and uncertainty, topical issues of evaluation of innovative projects at the present stage of development of the Russian economy. By the example of the solution of the "crossing the river" is considering the possibility of using hierarchical models to address it. In what follows, and compares the priorities of different groups of factors are given by calculating the overall costs and benefits. The paper provides a rationale for combined use of four aspects: the beneficial aspects of the decision (the benefits and opportunities and negative (costs and risks that may lead to the decision in question.

  1. Prototype Biology-Based Radiation Risk Module Project

    Science.gov (United States)

    Terrier, Douglas; Clayton, Ronald G.; Patel, Zarana; Hu, Shaowen; Huff, Janice

    2015-01-01

    Biological effects of space radiation and risk mitigation are strategic knowledge gaps for the Evolvable Mars Campaign. The current epidemiology-based NASA Space Cancer Risk (NSCR) model contains large uncertainties (HAT #6.5a) due to lack of information on the radiobiology of galactic cosmic rays (GCR) and lack of human data. The use of experimental models that most accurately replicate the response of human tissues is critical for precision in risk projections. Our proposed study will compare DNA damage, histological, and cell kinetic parameters after irradiation in normal 2D human cells versus 3D tissue models, and it will use a multi-scale computational model (CHASTE) to investigate various biological processes that may contribute to carcinogenesis, including radiation-induced cellular signaling pathways. This cross-disciplinary work, with biological validation of an evolvable mathematical computational model, will help reduce uncertainties within NSCR and aid risk mitigation for radiation-induced carcinogenesis.

  2. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casella, Amanda J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pereira, Mario M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Steen, Franciska H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  3. Evaluation of severe accident risks and the potential for risk reduction: Surry Power Station, Unit 1: Draft report for comment

    International Nuclear Information System (INIS)

    Benjamin, A.S.; Boyd, G.J.; Kunsman, D.M.; Murfin, W.B.; Williams, D.C.

    1987-02-01

    The Severe Accident Risk Reduction Program (SARRP) has completed a rebaselining of the risks to the public from a particular pressurized water reactor with a subatmospheric containment (Surry, Unit 1). Emphasis was placed on determining the magnitude and character of the uncertainties, rather than focusing on a point estimate. The risk-reduction potential of a set of proposed safety option backfits was also studied, and their costs and benefits were also evaluated. It was found that the risks from internal events are generally lower than previously evaluated in the Reactor Safety Study (RSS). However, certain unresolved issues (such as direct containment heating) caused the top of the uncertainty band to appear at a level that is comparable with the RSS point estimate. None of the postulated safety options appears to be cost effective for the Surry power plant. This work supports the Nuclear Regulatory Commission's assessment of severe accidents in NUREG-1150

  4. Evaluation of severe accident risks and the potential for risk reduction: Surry Power Station, Unit 1: Draft report for comment

    Energy Technology Data Exchange (ETDEWEB)

    Benjamin, A.S.; Boyd, G.J.; Kunsman, D.M.; Murfin, W.B.; Williams, D.C.

    1987-02-01

    The Severe Accident Risk Reduction Program (SARRP) has completed a rebaselining of the risks to the public from a particular pressurized water reactor with a subatmospheric containment (Surry, Unit 1). Emphasis was placed on determining the magnitude and character of the uncertainties, rather than focusing on a point estimate. The risk-reduction potential of a set of proposed safety option backfits was also studied, and their costs and benefits were also evaluated. It was found that the risks from internal events are generally lower than previously evaluated in the Reactor Safety Study (RSS). However, certain unresolved issues (such as direct containment heating) caused the top of the uncertainty band to appear at a level that is comparable with the RSS point estimate. None of the postulated safety options appears to be cost effective for the Surry power plant. This work supports the Nuclear Regulatory Commission's assessment of severe accidents in NUREG-1150.

  5. LIFESTAT - Living with statins: An interdisciplinary project on the use of statins as a cholesterol-lowering treatment and for cardiovascular risk reduction.

    Science.gov (United States)

    Christensen, Christa Lykke; Wulff Helge, Jørn; Krasnik, Allan; Kriegbaum, Margit; Rasmussen, Lene Juel; Hickson, Ian D; Liisberg, Kasper Bering; Oxlund, Bjarke; Bruun, Birgitte; Lau, Sofie Rosenlund; Olsen, Maria Nathalie Angleys; Andersen, John Sahl; Heltberg, Andreas Søndergaard; Kuhlman, Anja Birk; Morville, Thomas Hoffmann; Dohlmann, Tine Lovsø; Larsen, Steen; Dela, Flemming

    2016-07-01

    LIFESTAT is an interdisciplinary project that leverages approaches and knowledge from medicine, the humanities and the social sciences to analyze the impact of statin use on health, lifestyle and well-being in cohorts of Danish citizens. The impetus for the study is the fact that 10% of the population in the Scandinavian countries are treated with statins in order to maintain good health and to avoid cardiovascular disease by counteracting high blood levels of cholesterol. The potential benefit of treatment with statins should be considered in light of evidence that statin use has prevalent and unintended side effects (e.g. myalgia, and glucose and exercise intolerance). The LIFESTAT project combines invasive human experiments, biomedical analyses, nationwide surveys, epidemiological studies, qualitative interviews, media content analyses, and ethnographic participant observations. The study investigates the biological consequences of statin treatment; determines the mechanism(s) by which statin use causes muscle and mitochondrial dysfunction; and analyzes achievement of treatment goals, people's perception of disease risk, media influence on people's risk and health perception, and the way people manage to live with the risk (personally, socially and technologically). CONCLUSIONS THE ORIGINALITY AND SUCCESS OF LIFESTAT DEPEND ON AND DERIVE FROM ITS INTERDISCIPLINARY APPROACH, IN WHICH THE DISCIPLINES CONVERGE INTO THOROUGH AND HOLISTIC STUDY AND DESCRIBE THE IMPACT OF STATIN USE ON THE EVERYDAY LIFE OF STATIN USERS THIS HAS THE POTENTIAL FOR MUCH GREATER BENEFIT THAN ANY ONE OF THE DISCIPLINES ALONE INTEGRATING TRADITIONAL DISCIPLINES PROVIDES NOVEL PERSPECTIVES ON POTENTIAL CURRENT AND FUTURE SOCIAL, MEDICAL AND PERSONAL BENEFITS OF STATIN USE. © 2016 the Nordic Societies of Public Health.

  6. A procedure for seismic risk reduction in Campania Region

    International Nuclear Information System (INIS)

    Zuccaro, G.; Palmieri, M.; Cicalese, S.; Grassi, V.; Rauci, M.; Maggio, F.

    2008-01-01

    The Campania Region has set and performed a peculiar procedure in the field of seismic risk reduction. Great attention has been paid to public strategic buildings such as town halls, civil protection buildings and schools. The Ordinance 3274 promulgate in the 2004 by the Italian central authority obliged the owners of strategic buildings to perform seismic analyses within 2008 in order to check the safety of the structures and the adequacy to the use. In the procedure the Campania region, instead of the local authorities, ensure the complete drafting of seismic checks through financial resources of the Italian Government. A regional scientific technical committee has been constituted, composed of scientific experts, academics in seismic engineering. The committee has drawn up guidelines for the processing of seismic analyses. At the same time, the Region has issued a public competition to select technical seismic engineering experts to appoint seismic analysis in accordance with guidelines. The scientific committee has the option of requiring additional documents and studies in order to approve the safety checks elaborated. The Committee is supported by a technical and administrative secretariat composed of a group of expert in seismic engineering. At the moment several seismic safety checks have been completed. The results will be presented in this paper. Moreover, the policy to mitigate the seismic risk, set by Campania region, was to spend the most of the financial resources available on structural strengthening of public strategic buildings rather than in safety checks. A first set of buildings of which the response under seismic action was already known by data and studies of vulnerability previously realised, were selected for immediate retrofitting designs. Secondly, an other set of buildings were identified for structural strengthening. These were selected by using the criteria specified in the Guide Line prepared by the Scientific Committee and based on

  7. A procedure for seismic risk reduction in Campania Region

    Science.gov (United States)

    Zuccaro, G.; Palmieri, M.; Maggiò, F.; Cicalese, S.; Grassi, V.; Rauci, M.

    2008-07-01

    The Campania Region has set and performed a peculiar procedure in the field of seismic risk reduction. Great attention has been paid to public strategic buildings such as town halls, civil protection buildings and schools. The Ordinance 3274 promulgate in the 2004 by the Italian central authority obliged the owners of strategic buildings to perform seismic analyses within 2008 in order to check the safety of the structures and the adequacy to the use. In the procedure the Campania region, instead of the local authorities, ensure the complete drafting of seismic checks through financial resources of the Italian Government. A regional scientific technical committee has been constituted, composed of scientific experts, academics in seismic engineering. The committee has drawn up guidelines for the processing of seismic analyses. At the same time, the Region has issued a public competition to select technical seismic engineering experts to appoint seismic analysis in accordance with guidelines. The scientific committee has the option of requiring additional documents and studies in order to approve the safety checks elaborated. The Committee is supported by a technical and administrative secretariat composed of a group of expert in seismic engineering. At the moment several seismic safety checks have been completed. The results will be presented in this paper. Moreover, the policy to mitigate the seismic risk, set by Campania region, was to spend the most of the financial resources available on structural strengthening of public strategic buildings rather than in safety checks. A first set of buildings of which the response under seismic action was already known by data and studies of vulnerability previously realised, were selected for immediate retrofitting designs. Secondly, an other set of buildings were identified for structural strengthening. These were selected by using the criteria specified in the Guide Line prepared by the Scientific Committee and based on

  8. Merging Cultural Heritage Assessments with Risk Reduction and Disaster Recovery

    DEFF Research Database (Denmark)

    Bojsen, Ann Kristina Mikkelsen

    heritage. These limitations serve as motivation for the introduction of the ACTOR framework (Assessing Cultural Threats, Obstacles and Resilience) ACTOR aims at merging cultural heritage assessments with risk reduction and disaster recovery, and provide disaster management students with a learning......Abstract There is a general professional consensus that vulnerability and risk assessments are crucial tasks in any serious attempt to substantially reduce disaster losses and enhance the reconciliation or recovery in the post event phase. However, cultural heritage is often considered...... as an overarching element that should be assessed, rather than a permanent key component of the assessments. Research in disaster management noticeably illustrates how cultural heritage is increasingly at risk from disasters caused by natural and human-made hazards, as well as the effects of climate change. Still...

  9. Identifying hotspots of coastal risk and evaluating DRR measures: results from the RISC-KIT project.

    Science.gov (United States)

    Van Dongeren, A.; Ciavola, P.; Viavattene, C.; Dekleermaeker, S.; Martinez, G.; Ferreira, O.; Costa, C.

    2016-02-01

    High-impact storm events have demonstrated the vulnerability of coastal zones in Europe and beyond. These impacts are likely to increase due to predicted climate change and ongoing coastal development. In order to reduce impacts, disaster risk reduction (DRR) measures need to be taken, which prevent or mitigate the effects of storm events. To drive the DRR agenda, the UNISDR formulated the Sendai Framework for Action, and the EU has issued the Floods Directive. However, neither is specific about the methods to be used to develop actionable DRR measures in the coastal zone. Therefore, there is a need to develop methods, tools and approaches which make it possible to: identify and prioritize the coastal zones which are most at risk through a Coastal Risk Assessment Framework, evaluate the effectiveness of DRR options for these coastal areas, using an Early Warning/Decision Support System, which can be used both in the planning and event-phase. This paper gives an overview of the products and results obtained in the FP7-funded project RISC-KIT, which aims to develop and apply a set of tools with which highly-vulnerable coastal areas (so-called "hotspots") can be identified. The identification is done using the Coastal Risk Assessment Framework, or CRAF, which computes the intensity from multi-hazards, the exposure and the vulnerability, all components of risk, including network and cascading effects. Based on this analysis hot spots of risk which warrant coastal protection investments are selected. For these hotspot areas, high-resolution Early Warning and Decision Support Tools are developed with which it is possible to compute in detail the effectiveness of Disaster Risk Reduction measures in storm event scenarios, which helps decide which measures to implement in the planning phase. The same systems, but now driven with real time data, can also be used for early warning systems. All tools are tested on eleven case study areas, at least one on each EU Regional Sea

  10. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  11. Integrating knowledge for managing risk in infrastructure projects : the case of tunnel works

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen

    2012-01-01

    The objective of traditional approaches to project risk management is to identify risks that can lead to project failure and to implement effective strategies to manage them. Information on the relevant causes and conditions in which failures arise is usually required as necessary input for

  12. NASA Propulsion Concept Studies and Risk Reduction Activities for Resource Prospector Lander

    Science.gov (United States)

    Trinh, Huu P.; Williams, Hunter; Burnside, Chris

    2015-01-01

    The trade study has led to the selection of propulsion concept with the lowest cost and net lowest risk -Government-owned, flight qualified components -Meet mission requirements although the configuration is not optimized. Risk reduction activities have provided an opportunity -Implement design improvements while development with the early-test approach. -Gain knowledge on the operation and identify operation limit -Data to anchor analytical models for future flight designs; The propulsion system cold flow tests series have provided valuable data for future design. -The pressure surge from the system priming and waterhammer within component operation limits. -Enable to optimize the ullage volume to reduce the propellant tank mass; RS-34 hot fire tests have successfully demonstrated of using the engines for the RP mission -No degradation of performance due to extended storage life of the hardware. -Enable to operate the engine for RP flight mission scenarios, outside of the qualification regime. -Provide extended data for the thermal and GNC designs. Significant progress has been made on NASA propulsion concept design and risk reductions for Resource Prospector lander.

  13. Reduction of cancer risk by optimization of Computed Tomography head protocols: far eastern Cuban experience

    International Nuclear Information System (INIS)

    Miller Clemente, R.; Adame Brooks, D.; Lores Guevara, M.; Perez Diaz, M.; Arias Garlobo, M. L.; Ortega Rodriguez, O.; Nepite Haber, R.; Grinnan Hernandez, O.; Guillama Llosas, A.

    2015-01-01

    The cancer risk estimation constitutes one way for the evaluation of the public health, regarding computed tomography (CT) exposures. Starting from the hypothesis that the optimization of CT protocols would reduce significantly the added cancer risk, the purpose of this research was the application of optimization strategies regarding head CT protocols, in order to reduce the factors affecting the risk of induced cancer. The applied systemic approach included technological and human components, represented by quantitative physical factors. the volumetric kerma indexes, compared with respect to standard, optimized and reference values, were evaluated with multiple means comparison method. The added cancer risk resulted from the application of the methodology for biological effects evaluation, at low doses with low Linear Energy Transfer. Human observers in all scenarios evaluated the image quality. the reduced dose was significantly lower than for standard head protocols and reference levels, where: (1) for pediatric patients, by using an Automatic Exposure Control system, a reduction of 31% compared with standard protocol and ages range of 10-14, and (2) adults, using a Bilateral Filter for images obtained at low doses of 62% from those of standard head protocol. The risk reduction was higher than 25%. The systemic approach used allows the effective identification of factors involved on cancer risk related with exposures to CT. The combination of dose modulation and image restoration with Bilateral Filter, provide a significantly reduction of cancer risk, with acceptable diagnostic image quality. (Author)

  14. Resilience and disaster risk reduction: an etymological journey

    Science.gov (United States)

    Alexander, D. E.

    2013-04-01

    This paper examines the development over historical time of the meaning and uses of the term resilience. The objective is to deepen our understanding of how the term came to be adopted in disaster risk reduction and resolve some of the conflicts and controversies that have arisen when it has been used. The paper traces the development of resilience through the sciences, humanities, and legal and political spheres. It considers how mechanics passed the word to ecology and psychology, and how from there it was adopted by social research and sustainability science. As other authors have noted, as a concept, resilience involves some potentially serious conflicts or contradictions, for example between stability and dynamism, or between dynamic equilibrium (homeostasis) and evolution. Moreover, although the resilience concept works quite well within the confines of General Systems Theory, in situations in which a systems formulation inhibits rather than fosters explanation, a different interpretation of the term is warranted. This may be the case for disaster risk reduction, which involves transformation rather than preservation of the ''state of the system''. The article concludes that the modern conception of resilience derives benefit from a rich history of meanings and applications, but that it is dangerous - or at least potentially disappointing - to read to much into the term as a model and a paradigm. Sagitta in lapidem numquam figitur, interdum resiliens percutit dirigentem. ("An arrow never lodges in a stone: often it recoils upon its sender.") St. John Chrysostom (c. 347-407), Archbishop of Constantinople.

  15. Risk reduction and the privatization option: First principles

    International Nuclear Information System (INIS)

    Bjornstad, D.J.; Jones, D.W.; Russell, M.; Cummings, R.C.; Valdez, G.; Duemmer, C.L.

    1997-01-01

    The Department of Energy's Office of Environmental Restoration and Waste Management (EM) faces a challenging mission. To increase efficiency, EM is undertaking a number of highly innovative initiatives--two of which are of particular importance to the present study. One is the 2006 Plan, a planning and budgeting process that seeks to convert the clean-up program from a temporally and fiscally open-ended endeavor to a strictly bounded one, with firm commitments over a decade-long horizon. The second is a major overhauling of the management and contracting practices that define the relationship between the Department and the private sector, aimed at cost reduction by increasing firms' responsibilities and profit opportunities and reducing DOE's direct participation in management practices and decisions. The goal of this paper is to provide an independent perspective on how EM should create new management practices to deal with private sector partners that are motivated by financial incentives. It seeks to ground this perspective in real world concerns--the background of the clean-up effort, the very difficult technical challenges it faces, the very real threats to environment, health and safety that have now been juxtaposed with financial drivers, and the constraints imposed by government's unique business practices and public responsibilities. The approach is to raise issues through application of first principles. The paper is targeted at the EM policy officer who must implement the joint visions of the 2006 plan and privatization within the context of the tradeoff between terminal risk reduction and interim risk management

  16. Risk reduction and the privatization option: First principles

    Energy Technology Data Exchange (ETDEWEB)

    Bjornstad, D.J.; Jones, D.W.; Russell, M. [Joint Inst. for Energy and Environment, Knoxville, TN (United States); Cummings, R.C.; Valdez, G. [Georgia State Univ., Atlanta, GA (United States); Duemmer, C.L. [Hull, Duemmer and Garland (United States)

    1997-06-25

    The Department of Energy`s Office of Environmental Restoration and Waste Management (EM) faces a challenging mission. To increase efficiency, EM is undertaking a number of highly innovative initiatives--two of which are of particular importance to the present study. One is the 2006 Plan, a planning and budgeting process that seeks to convert the clean-up program from a temporally and fiscally open-ended endeavor to a strictly bounded one, with firm commitments over a decade-long horizon. The second is a major overhauling of the management and contracting practices that define the relationship between the Department and the private sector, aimed at cost reduction by increasing firms` responsibilities and profit opportunities and reducing DOE`s direct participation in management practices and decisions. The goal of this paper is to provide an independent perspective on how EM should create new management practices to deal with private sector partners that are motivated by financial incentives. It seeks to ground this perspective in real world concerns--the background of the clean-up effort, the very difficult technical challenges it faces, the very real threats to environment, health and safety that have now been juxtaposed with financial drivers, and the constraints imposed by government`s unique business practices and public responsibilities. The approach is to raise issues through application of first principles. The paper is targeted at the EM policy officer who must implement the joint visions of the 2006 plan and privatization within the context of the tradeoff between terminal risk reduction and interim risk management.

  17. Takotsubo Cardiomyopathy: A Long Term Follow-up Shows Benefit with Risk Factor Reduction

    Directory of Open Access Journals (Sweden)

    Koroush Khalighi

    2015-11-01

    Full Text Available Only sparse data was available on long-term of Takotusbo Cardiomyopathy (TC. Previous studies suggested prognosis is not necessarily benign. We report the long-term follow-up of 12 TC patients actively managed with risk factor reduction. Retrospective analysis of all patients diagnosed with TC at our hospital between 1998 and 2010. We identified 12 patients with TC among 1651 cases of emergent left heart catheterization over 12 years. Mean follow-up time was 8.3 ± 3.6 years. All were female, 87% had hypertension, 25% had history of Coronary Artery Disease (CAD, 67% had hyperlipidemia, 44% had some preceding emotional trauma, and 44% had some physical/physiological stress. Previous studies have shown that over 50% of TC patients experience future cardiac events, and 10% have a recurrence of TC. Patients were prescribed therapeutic lifestyle changes (TLC and guideline directed medical therapy (GDMT for aggressive risk factor reduction. TLC included diet, exercise, and cardiac rehabilitation. GDMT often included aspirin, beta-blockers, ACE-inhibitors, and statins. Follow-up echocardiograms showed recovery and maintenance of the ejection fraction. There was no cardiac mortality and no recurrences of TC. Aggressive risk factor reduction with TLC and GDMT may be effective in improving the long term outcomes of patients with TC.

  18. Ibrutinib-associated bleeding: pathogenesis, management and risk reduction strategies.

    Science.gov (United States)

    Shatzel, J J; Olson, S R; Tao, D L; McCarty, O J T; Danilov, A V; DeLoughery, T G

    2017-05-01

    Ibrutinib is an irreversible inhibitor of Bruton's tyrosine kinase (Btk) that has proven to be an effective therapeutic agent for multiple B-cell-mediated lymphoproliferative disorders. Ibrutinib, however, carries an increased bleeding risk compared with standard chemotherapy. Bleeding events range from minor mucocutaneous bleeding to life-threatening hemorrhage, due in large part to the effects of ibrutinib on several distinct platelet signaling pathways. There is currently a minimal amount of data to guide clinicians regarding the use of ibrutinib in patients at high risk of bleeding or on anticoagulant or antiplatelet therapy. In addition, the potential cardiovascular protective effects of ibrutinib monotherapy in patients at risk of vascular disease are unknown. Patients should be cautioned against using non-steroidal anti-inflammatory drugs, fish oils, vitamin E and aspirin-containing products, and consider replacing ibrutinib with a different agent if dual antiplatelet therapy is indicated. Patients should not take vitamin K antagonists concurrently with ibrutinib; direct oral anticoagulants should be used if extended anticoagulation is strongly indicated. In this review, we describe the pathophysiology of ibrutinib-mediated bleeding and suggest risk reduction strategies for common clinical scenarios associated with ibrutinib. © 2017 International Society on Thrombosis and Haemostasis.

  19. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    Directory of Open Access Journals (Sweden)

    Voytolovskiy Nikolay

    2017-01-01

    Full Text Available This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment project risks were specified on the basis of interconnection of risk and project effectiveness. Risk management procedure at realization of the developer project was developed.

  20. RiskChanges Spatial Decision Support system for the analysis of changing multi-hazard risk

    Science.gov (United States)

    van Westen, Cees; Zhang, Kaixi; Bakker, Wim; Andrejchenko, Vera; Berlin, Julian; Olyazadeh, Roya; Cristal, Irina

    2015-04-01

    Within the framework of the EU FP7 Marie Curie Project CHANGES and the EU FP7 Copernicus project INCREO a spatial decision support system was developed with the aim to analyse the effect of risk reduction planning alternatives on reducing the risk now and in the future, and support decision makers in selecting the best alternatives. Central to the SDSS are the stakeholders. The envisaged users of the system are organizations involved in planning of risk reduction measures, and that have staff capable of visualizing and analyzing spatial data at a municipal scale. The SDSS should be able to function in different countries with different legal frameworks and with organizations with different mandates. These could be subdivided into Civil protection organization with the mandate to design disaster response plans, Expert organizations with the mandate to design structural risk reduction measures (e.g. dams, dikes, check-dams etc), and planning organizations with the mandate to make land development plans. The SDSS can be used in different ways: analyzing the current level of risk, analyzing the best alternatives for risk reduction, the evaluation of the consequences of possible future scenarios to the risk levels, and the evaluation how different risk reduction alternatives will lead to risk reduction under different future scenarios. The SDSS is developed based on open source software and following open standards, for code as well as for data formats and service interfaces. Code development was based upon open source software as well. The architecture of the system is modular. The various parts of the system are loosely coupled, extensible, using standards for interoperability, flexible and web-based. The Spatial Decision Support System is composed of a number of integrated components. The Risk Assessment component allows to carry out spatial risk analysis, with different degrees of complexity, ranging from simple exposure (overlay of hazard and assets maps) to

  1. A randomized comparison of patients' understanding of number needed to treat and other common risk reduction formats.

    Science.gov (United States)

    Sheridan, Stacey L; Pignone, Michael P; Lewis, Carmen L

    2003-11-01

    Commentators have suggested that patients may understand quantitative information about treatment benefits better when they are presented as numbers needed to treat (NNT) rather than as absolute or relative risk reductions. To determine whether NNT helps patients interpret treatment benefits better than absolute risk reduction (ARR), relative risk reduction (RRR), or a combination of all three of these risk reduction presentations (COMBO). Randomized cross-sectional survey. University internal medicine clinic. Three hundred fifty-seven men and women, ages 50 to 80, who presented for health care. Subjects were given written information about the baseline risk of a hypothetical "disease Y" and were asked (1) to compare the benefits of two drug treatments for disease Y, stating which provided more benefit; and (2) to calculate the effect of one of those drug treatments on a given baseline risk of disease. Risk information was presented to each subject in one of four randomly allocated risk formats: NNT, ARR, RRR, or COMBO. When asked to state which of two treatments provided more benefit, subjects who received the RRR format responded correctly most often (60% correct vs 43% for COMBO, 42% for ARR, and 30% for NNT, P =.001). Most subjects were unable to calculate the effect of drug treatment on the given baseline risk of disease, although subjects receiving the RRR and ARR formats responded correctly more often (21% and 17% compared to 7% for COMBO and 6% for NNT, P =.004). Patients are best able to interpret the benefits of treatment when they are presented in an RRR format with a given baseline risk of disease. ARR also is easily interpreted. NNT is often misinterpreted by patients and should not be used alone to communicate risk to patients.

  2. Engineering risk assessment for emergency disposal projects of sudden water pollution incidents.

    Science.gov (United States)

    Shi, Bin; Jiang, Jiping; Liu, Rentao; Khan, Afed Ullah; Wang, Peng

    2017-06-01

    Without an engineering risk assessment for emergency disposal in response to sudden water pollution incidents, responders are prone to be challenged during emergency decision making. To address this gap, the concept and framework of emergency disposal engineering risks are reported in this paper. The proposed risk index system covers three stages consistent with the progress of an emergency disposal project. Fuzzy fault tree analysis (FFTA), a logical and diagrammatic method, was developed to evaluate the potential failure during the process of emergency disposal. The probability of basic events and their combination, which caused the failure of an emergency disposal project, were calculated based on the case of an emergency disposal project of an aniline pollution incident in the Zhuozhang River, Changzhi, China, in 2014. The critical events that can cause the occurrence of a top event (TE) were identified according to their contribution. Finally, advices on how to take measures using limited resources to prevent the failure of a TE are given according to the quantified results of risk magnitude. The proposed approach could be a potential useful safeguard for the implementation of an emergency disposal project during the process of emergency response.

  3. Ecohydrology of agroecosystems: probabilistic description of yield reduction risk under limited water availability

    Science.gov (United States)

    Vico, Giulia; Porporato, Amilcare

    2013-04-01

    Supplemental irrigation represents one of the main strategies to mitigate the effects of climate variability and stabilize yields. Irrigated agriculture currently provides 40% of food production and its relevance is expected to further increase in the near future, in face of the projected alterations of rainfall patterns and increase in food, fiber, and biofuel demand. Because of the significant investments and water requirements involved in irrigation, strategic choices are needed to preserve productivity and profitability, while maintaining a sustainable water management - a nontrivial task given the unpredictability of the rainfall forcing. To facilitate decision making under uncertainty, a widely applicable probabilistic framework is proposed. The occurrence of rainfall events and irrigation applications are linked probabilistically to crop development during the growing season and yields at harvest. Based on these linkages, the probability density function of yields and corresponding probability density function of required irrigation volumes, as well as the probability density function of yields under the most common case of limited water availability are obtained analytically, as a function of irrigation strategy, climate, soil and crop parameters. The full probabilistic description of the frequency of occurrence of yields and water requirements is a crucial tool for decision making under uncertainty, e.g., via expected utility analysis. Furthermore, the knowledge of the probability density function of yield allows us to quantify the yield reduction hydrologic risk. Two risk indices are defined and quantified: the long-term risk index, suitable for long-term irrigation strategy assessment and investment planning, and the real-time risk index, providing a rigorous probabilistic quantification of the emergence of drought conditions during a single growing season in an agricultural setting. Our approach employs relatively few parameters and is thus easily and

  4. Deep Uncertainty Surrounding Coastal Flood Risk Projections: A Case Study for New Orleans

    Science.gov (United States)

    Wong, Tony E.; Keller, Klaus

    2017-10-01

    Future sea-level rise drives severe risks for many coastal communities. Strategies to manage these risks hinge on a sound characterization of the uncertainties. For example, recent studies suggest that large fractions of the Antarctic ice sheet (AIS) may rapidly disintegrate in response to rising global temperatures, leading to potentially several meters of sea-level rise during the next few centuries. It is deeply uncertain, for example, whether such an AIS disintegration will be triggered, how much this would increase sea-level rise, whether extreme storm surges intensify in a warming climate, or which emissions pathway future societies will choose. Here, we assess the impacts of these deep uncertainties on projected flooding probabilities for a levee ring in New Orleans, LA. We use 18 scenarios, presenting probabilistic projections within each one, to sample key deeply uncertain future projections of sea-level rise, radiative forcing pathways, storm surge characterization, and contributions from rapid AIS mass loss. The implications of these deep uncertainties for projected flood risk are thus characterized by a set of 18 probability distribution functions. We use a global sensitivity analysis to assess which mechanisms contribute to uncertainty in projected flood risk over the course of a 50-year design life. In line with previous work, we find that the uncertain storm surge drives the most substantial risk, followed by general AIS dynamics, in our simple model for future flood risk for New Orleans.

  5. safety risk management based on fuzzy logic at underground projects

    Directory of Open Access Journals (Sweden)

    Farhad Taherkhani

    2017-11-01

    Conclusion: In the present article, a new model was developed to calculate the probability of occurrence of the event, which so far has not been addressed in other studies. Finally, effective measures can be taken to reduce the risk of a project by eliminating the high risk factors.

  6. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  7. A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk

    Directory of Open Access Journals (Sweden)

    Yonggu Kim

    2018-03-01

    Full Text Available This paper focuses on an investment decision-making process for sustainable development based on the profitability impact factors for overseas projects. Investors prefer to use the discounted cash-flow method. Although this method is simple and straightforward, its critical weakness is its inability to reflect the factor volatility associated with the project evaluation. To overcome this weakness, the Value-at-Risk method is used to apply the volatility of the profitability impact factors, thereby reflecting the risks and establishing decision-making criteria for risk-averse investors. Risk-averse investors can lose relatively acceptable investment opportunities to risk-neutral or risk-amenable investors due to strict investment decision-making criteria. To overcome this problem, critical factors are selected through a Monte Carlo simulation and a sensitivity analysis, and solutions to the critical-factor problems are then found by using the Theory of Inventive Problem Solving and a business version of the Project Definition Rating Index. This study examines the process of recovering investment opportunities with projects that are investment feasible and that have been rejected when applying the criterion of the Value-at-Risk method. To do this, a probabilistic alternative approach is taken. To validate this methodology, the proposed framework for an improved decision-making process is demonstrated using two actual overseas projects of a Korean steel-making company.

  8. Promoting flood risk reduction: The role of insurance in Germany and England

    Science.gov (United States)

    Surminski, Swenja; Thieken, Annegret H.

    2017-10-01

    Improving society's ability to prepare for, respond to and recover from flooding requires integrated, anticipatory flood risk management (FRM). However, most countries still focus their efforts on responding to flooding events if and when they occur rather than addressing their current and future vulnerability to flooding. Flood insurance is one mechanism that could promote a more ex ante approach to risk by supporting risk reduction activities. This paper uses an adapted version of Easton's System Theory to investigate the role of insurance for FRM in Germany and England. We introduce an anticipatory FRM framework, which allows flood insurance to be considered as part of a broader policy field. We analyze if and how flood insurance can catalyze a change toward a more anticipatory approach to FRM. In particular we consider insurance's role in influencing five key components of anticipatory FRM: risk knowledge, prevention through better planning, property-level protection measures, structural protection and preparedness (for response). We find that in both countries FRM is still a reactive, event-driven process, while anticipatory FRM remains underdeveloped. Collaboration between insurers and FRM decision-makers has already been successful, for example in improving risk knowledge and awareness, while in other areas insurance acts as a disincentive for more risk reduction action. In both countries there is evidence that insurance can play a significant role in encouraging anticipatory FRM, but this remains underutilized. Effective collaboration between insurers and government should not be seen as a cost, but as an investment to secure future insurability through flood resilience.

  9. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  10. Interconnection of the Degree of Risk and Life Cycle of the “Green Construction” Investment Projects

    OpenAIRE

    Lepehova Natalia; Shoshinov Vitaly

    2017-01-01

    This article analyses interconnection of the degree of risk and the life cycle of the “green building” investment projects, which is structured according to the life cycle. Main stages of the implementation of investment and construction project were considered, interconnection of the project life cycle and the level of project risk were presented in the form of graphical model, proposed a mathematical model of the risk calculation at different stages of the project life cycle, which is a fun...

  11. RIBA Project - Risk-Informed approach for In-Service Inspection of Nuclear Power Plant Components. Project summary

    International Nuclear Information System (INIS)

    Lidbury, D.; Smith, G.

    2001-12-01

    The need for a European review of a Risk-Informed Approach for In-Service Inspection of Nuclear Power Plant Components (RIBA) was identified in 1998. This was as a priority item in the programme of activities conducted in the framework of the Council Resolutions of 22 July 1975 and of 18 June 1992 on the Technological Problems of Nuclear Safety. The RIBA Project was established in November 1999 as a 24-month Study Contract funded by the European Commission within the frame of the former DG XI WGCS (Working Group on Codes and Standards). The Study Contract was subsequently managed for the EC by DG TREN. The participants in RIBA were Serco Assurance (project coordinator), Ringhals AB, EDF, Tecnatom SA and Westinghouse Electric Europe. The work is presented in a summary report with the detailed results contained in three companion reports as follows: main conclusions and recommendations, Review of Existing Risk-Informed Methodologies, A Comparative Study of Risk-Informed In-Service Inspection Applications, Conclusions and Recommendations for Risk-Informed in-service inspection methodology applied to Nuclear Power Plants in Europe. (author)

  12. Risk assessment in energy efficiency projects; Gerenciamento de riscos em projetos de eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Aragao Neto, Raymundo Moniz de

    2003-08-15

    This paper aims to present processes related to risk management in energy efficiency projects, delivered in a performance contracting basis. Introductory comments will be presented about the considered project model, emphasizing the necessity of proper processes of risk management and evaluation and their treatment according methodology developed by PMI - Project Management Institute, grouped in its publication PMBOK - Project Management Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian market reality, as a form of illustrating the considered methodology.

  13. Highlight report: Launch of a large integrated European in vitro toxicology project: EU-ToxRisk.

    Science.gov (United States)

    Daneshian, Mardas; Kamp, Hennicke; Hengstler, Jan; Leist, Marcel; van de Water, Bob

    2016-05-01

    The integrated European project, EU-ToxRisk, proudly sees itself as "flagship" exploring new alternative-to-animal approaches to chemical safety evaluation. It promotes mechanism-based toxicity testing and risk assessment according to the principles laid down for toxicology for the twenty-first century. The project was officially launched in January 2016 with a kickoff meeting in Egmond aan Zee, the Netherlands. Over 100 scientists representing academia and industry as well as regulatory authorities attended the inaugural meeting. The project will integrate advances in in vitro and in silico toxicology, read-across methods, and adverse outcome pathways. EU-ToxRisk will continue to make use of the case study strategy deployed in SEURAT-1, a FP7 initiative ended in December 2015. Even though the development of new non-animal methods is one target of EU-ToxRisk, the project puts special emphasis on their acceptance and implementation in regulatory contexts. This €30 million Horizon 2020 project involves 38 European partners and one from the USA. EU-ToxRisk aims at the "development of a new way of risk assessment."

  14. Assessing reservoir performance risk in CO2 storage projects

    International Nuclear Information System (INIS)

    Bowden, A.R.; Rigg, A.

    2005-01-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO 2 ) has been the development of a proper methodology to assess and compare alternative CO 2 injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO 2 , and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO 2 injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO 2 injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs

  15. Managing dependencies in forest offset projects: toward a more complete evaluation of reversal risk

    Science.gov (United States)

    David M Cooley; Chrsitopher S Galik; Thomas P Holmes; Carolyn Kousky; Roger M Cooke

    2011-01-01

    Although forest carbon offsets can play an important role in the implementation of comprehensive climate policy, they also face an inherent risk of reversal. If such risks are positively correlated across projects, it can affect the integrity of larger project portfolios and potentially the entire offsets program. Here, we discuss three types of risks that could affect...

  16. The CAREM-25 project from the risk point of view

    International Nuclear Information System (INIS)

    Baron, J.H.

    1998-01-01

    The future use of the nuclear energy for electricity production is considered a possible alternative, mainly taking into account the high environmental impact of the fossil fuel alternatives (greenhouse effect, acid rain). In a worldwide context, however, it is desirable for the new nuclear power plants to be safer than the present ones. To demonstrate the safety level of a nuclear installation, the Risk Analysis (in fact, Probabilistic Safety Analysis) is an adequate tool, as it allows for the risk level quantification. The risk itself is composed of two factors, the first takes into account the probability associated with accidental sequences that release radioactive materials, the second takes into account the amount and consequences of such a release. In the present work, the reduction of both factors is faced, the probability by using simpler safety systems (inherently safe systems), and the consequence by using small power production units, that have, besides, passive mitigation systems and long response times. The work is illustrated with a risk comparison for electricity production via CAREM-25 units, against via a classic design unit (Atucha II). The results are base in Probabilistic Safety Studies performed for both installations. The conclusions show an effective risk reduction (both in probability and in consequence), reaching the point where in no case acute irradiation effects are predicted in the vicinity of the accidented plant. (author) [es

  17. Data base on dose reduction research projects for nuclear power plants. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Vulin, D.S.; Liang, H.; Baum, J.W. [Brookhaven National Lab., Upton, NY (United States)

    1992-08-01

    This is the fourth volume in a series of reports that provide information on dose reduction research and health physics technology for nuclear power plants. The information is taken from a data base maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. This report presents information on 118 new or updated projects, covering a wide range of activities. Projects including steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section of the report. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Included in this volume is a detailed description of how to access the BNL data bases which store this information. All project abstracts from this report, as well as many other useful documents, can be accessed, with permission, through our on-line system, ACE. A computer equipped with a modem, or a fax machine is all that is required to connect to ACE. Many features of ACE, including software, hardware, and communications specifics, are explained in this report.

  18. Alpha-risk: a European project on the quantification of risks associated with multiple radiation exposures

    International Nuclear Information System (INIS)

    Laurier, D.; Monchaux, G.; Tirmarche, M.; Darby, S.; Cardis, E.; Binks, K.; Hofmann, W.; Muirhead, C.

    2006-01-01

    The Alpha-Risk research project is being conducted within the Sixth European Framework Programme (EC-FP6, 2005 -2008). It aims to improve the quantification of risks associated with multiple exposures, taking into account the contribution of different radionuclides and external exposure using specific organ dose calculations. The Alpha-Risk Consortium involves 18 partners from 9 countries, and is coordinated by the IRSN. Its composition allows a multidisciplinary collaboration between researchers in epidemiology, dosimetry, statistics, modelling and risk assessment. Alpha-Risk brings together major epidemiological studies in Europe, which are able to evaluate long-term health effects of internal exposure from radionuclides. It includes large size cohort and case-control studies, with accurate registration of individual annual exposures: uranium miner studies, studies on lung cancer and indoor radon exposure, and studies of lung cancer and leukaemia among nuclear workers exposed to transuranic nuclides (mainly uranium and plutonium), for whom organ doses will be reconstructed individually. The contribution of experts in dosimetry will allow the calculation of organ doses in presence of multiple exposures (radon decay products, uranium dust and external gamma exposure). Expression of the risk per unit organ dose will make it possible to compare results with those from other populations exposed to external radiation. The multidisciplinary approach of Alpha-Risk promotes the development of coherent and improved methodological approaches regarding risk modelling. A specific work - package is dedicated to the integration of results and their use for risk assessment, especially for radon. Alpha-Risk will contribute to a better understanding of long-term health risks following chronic low doses from internal exposures. The project also has the great potential to help resolve major public health concerns about the effects of low and/or protracted exposures, especially

  19. Natural risks assessment and management (project of monograph)

    International Nuclear Information System (INIS)

    Ragozin, A.L.

    1998-01-01

    Full text of publication follows: large-scale theoretic and practical works on the issue of natural risk assessment and management started in Russia in the end of the 80's. By now there has been made a considerable progress, which allowed for the preparation of a collective monograph on the subject mentioned in the title of this abstract. It is supposed to be published in 1999 in order to become a Russian contribution to the International Decade of Natural Disasters Reduction. The monograph included 6 chapters with the following titles: 1. Methodological foundations of natural risk analysis and assessment. 2. Investigating and forecasting natural hazards for the purpose of risk assessment. 3. Assessment of economic, social and ecological damage from natural hazards. 4, Theory of natural risk assessment. 5. Examples of natural risk assessment and mapping. 6. Natural risk management. In the report there is described the content of the monograph and unsolved questions are discussed. Executive editor offers all international experts to cooperate in the compilation of this monograph, which is to be completed by the end of 1998, especially of chapter 5 and 6. (author)

  20. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY I QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  1. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY II QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  2. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  3. Case management to reduce cardiovascular disease risk in American Indians and Alaska Natives with diabetes: results from the Special Diabetes Program for Indians Healthy Heart Demonstration Project.

    Science.gov (United States)

    Moore, Kelly; Jiang, Luohua; Manson, Spero M; Beals, Janette; Henderson, William; Pratte, Katherine; Acton, Kelly J; Roubideaux, Yvette

    2014-11-01

    We evaluated cardiovascular disease (CVD) risk factors in American Indians/Alaska Natives (AI/ANs) with diabetes in the Special Diabetes Program for Indians Healthy Heart (SDPI-HH) Demonstration Project. Multidisciplinary teams implemented an intensive case management intervention among 30 health care programs serving 138 tribes. The project recruited 3373 participants, with and without current CVD, between 2006 and 2009. We examined data collected at baseline and 1 year later to determine whether improvements occurred in CVD risk factors and in Framingham coronary heart disease (CHD) risk scores, aspirin use, and smoking status. A1c levels decreased an average of 0.2% (P risk scores also decreased significantly. Aspirin therapy increased significantly, and smoking decreased. Participants with more case management visits had significantly greater reductions in LDL cholesterol and A1c values. SDPI-HH successfully translated an intensive case management intervention. Creative retention strategies and an improved understanding of organizational challenges are needed for future Indian health translational efforts.

  4. Participatory three dimensional mapping for the preparation of landslide disaster risk reduction program

    Science.gov (United States)

    Kusratmoko, Eko; Wibowo, Adi; Cholid, Sofyan; Pin, Tjiong Giok

    2017-07-01

    This paper presents the results of applications of participatory three dimensional mapping (P3DM) method for fqcilitating the people of Cibanteng' village to compile a landslide disaster risk reduction program. Physical factors, as high rainfall, topography, geology and land use, and coupled with the condition of demographic and social-economic factors, make up the Cibanteng region highly susceptible to landslides. During the years 2013-2014 has happened 2 times landslides which caused economic losses, as a result of damage to homes and farmland. Participatory mapping is one part of the activities of community-based disaster risk reduction (CBDRR)), because of the involvement of local communities is a prerequisite for sustainable disaster risk reduction. In this activity, participatory mapping method are done in two ways, namely participatory two-dimensional mapping (P2DM) with a focus on mapping of disaster areas and participatory three-dimensional mapping (P3DM) with a focus on the entire territory of the village. Based on the results P3DM, the ability of the communities in understanding the village environment spatially well-tested and honed, so as to facilitate the preparation of the CBDRR programs. Furthermore, the P3DM method can be applied to another disaster areas, due to it becomes a medium of effective dialogue between all levels of involved communities.

  5. HIV Risk Reduction Among Young Adult Chronic Psychiatric Patients

    Science.gov (United States)

    1990-08-28

    emotional language to convey information on risk reduction. Common myths concerning transmission are presented and the audience is specifically told that...current study include: ’Can contact with semen (cum) from the penis result In AIDS?’,’ Can a person get AIDS from vaginal fluids in a woman’s vagina ? Can...hands. It doesn’t like being exposed to sunlight or air. Female: The AIDS virus lives inside the human body, in the blood, in a woman’s vagina and

  6. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  7. Project finance risk evaluation of the Electric power industry of Serbia

    International Nuclear Information System (INIS)

    Makajic Nikolic, Dragana; Jednak, Sandra; Benkovic, Sladana; Poznanic, Vladimir

    2011-01-01

    From the aspect of the development of a country, the energy sector represents a domain of strategic interest. Generation and use of energy resources most often belongs to the public sector, and are most often under the influence of the government in most countries. This paper analyzes the risks that are characteristic to the business of the public enterprise, Electric Power Industry of Serbia (EPS). EPS has started its restructuring and is adjusting to changes and challenges imposed by the launched reforms in the energy sector. However, due to certain limitations, it is still not possible to implement its complete restructuring and modernization. The paper aims to point at the risks a potential strategic partner faces. The risks have been identified as commercial, financial and political, classification immanent for project finance, and their evaluation was done using Failure Mode and Effects Analysis (FMEA). Risk analysis was performed based on current conditions for two potential scenarios that predict different types of changes in the analyzed period. The results of the analysis show that the potential strategic partner should pay special attention to price risks, estimation, investments, project activity neglect, quasi-risks and debt collection. - Highlights: → Paper analyze all risks characteristic for business running of the public enterprise EPS. → Potential strategic partner faces with the commercial, financial and political risks. → Risk analysis was done using FMEA. → Results are indicating high risk of investing in EPS. → The highest risks are commercial risks, especially price risks.

  8. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  9. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  10. Risk analysis for construction and operation of gas pipeline projects in pakistan

    International Nuclear Information System (INIS)

    Mubin, S.; Mubin, G.

    2008-01-01

    In order to cater for its high energy demand, Pakistan is planning to import natural gas through pipelines from neighboring countries. For fully utilizing the imported gas, providing it to end customers, the infrastructure of gas pipeline needs to be developed. Therefore, huge investment has been done and proposed in this sector in coming future. Considering geological, topographical, geopolitical and climatic conditions of the country, there is added risk of earthquake, landslides and floods. Due to current geopolitical situation there is a persistent threat of unrest and terrorism in the country. Instable Government policies, high rate of inflation, rapid change in material prices are also important risk factors. All these factors make the situation very complex in quantifying the risk especially for a project in which the risk impact factor rises exponentially in case of risk occurrence. In this paper, most appropriate risk classification is made based on technological, organizational, political, natural climatic, security and environmental risk factors. Effort has been made to device a simpler risk management methodology to analyze and manage risks of gas pipeline project. In the proposed risk management model Monte Carlo simulation has been used to identify critical risks. (author)

  11. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  12. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  13. Assessment of Transport Projects: Risk Analysis and Decision Support

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2008-01-01

    functions. New research proved that specifically two impacts stood out in transport project assessment, namely, travel time savings and construction costs. The final concern of this study has been the fitting of distributions, e.g. by the use of data from major databases developed in which Optimism Bias...... choosing probability distributions and performing real term data fits. The perspective of this Ph.D. study presents newer and better understanding of assigning risks within assessment of transport projects....

  14. Acute Radiation Risk and BRYNTRN Organ Dose Projection Graphical User Interface

    Science.gov (United States)

    Cucinotta, Francis A.; Hu, Shaowen; Nounu, Hateni N.; Kim, Myung-Hee

    2011-01-01

    The integration of human space applications risk projection models of organ dose and acute radiation risk has been a key problem. NASA has developed an organ dose projection model using the BRYNTRN with SUM DOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUM DOSE are a Baryon transport code and an output data processing code, respectively. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN. A GUI for the ARR and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. BRYNTRN code operation requires extensive input preparation. Only a graphical user interface (GUI) can handle input and output for BRYNTRN to the response models easily and correctly. The purpose of the GUI development for ARRBOD is to provide seamless integration of input and output manipulations for the operations of projection modules (BRYNTRN, SLMDOSE, and the ARR probabilistic response model) in assessing the acute risk and the organ doses of significant Solar Particle Events (SPEs). The assessment of astronauts radiation risk from SPE is in support of mission design and operational planning to manage radiation risks in future space missions. The ARRBOD GUI can identify the proper shielding solutions using the gender-specific organ dose assessments in order to avoid ARR symptoms, and to stay within the current NASA short-term dose limits. The quantified evaluation of ARR severities based on any given shielding configuration and a specified EVA or other mission

  15. Development of the Motivation to Change Lifestyle and Health Behaviours for Dementia Risk Reduction Scale

    Directory of Open Access Journals (Sweden)

    Sarang Kim

    2014-06-01

    Full Text Available Background and Aims: It is not yet understood how attitudes concerning dementia risk may affect motivation to change health behaviours and lifestyle. This study was designed to develop a reliable and valid theory-based measure to understand beliefs underpinning the lifestyle and health behavioural changes needed for dementia risk reduction. Methods: 617 participants aged ≥50 years completed a theory-based questionnaire, namely, the Motivation to Change Lifestyle and Health Behaviours for Dementia Risk Reduction (MCLHB-DRR scale. The MCLHB-DRR consists of 53 items, reflecting seven subscales of the Health Belief Model. Results: Confirmatory factor analysis was performed and revealed that a seven-factor solution with 27 items fitted the data (comparative fit index = 0.920, root-mean-square error of approximation = 0.047 better than the original 53 items. Internal reliability (α = 0.608-0.864 and test-retest reliability (α = 0.552-0.776 were moderate to high. Measurement of invariance across gender and age was also demonstrated. Conclusions: These results propose that the MCLHB-DRR is a useful tool in assessing the beliefs and attitudes of males and females aged ≥50 years towards dementia risk reduction. This measure can be used in the development and evaluation of interventions aimed at dementia prevention.

  16. Current industrial practice of managing risks in product development project portfolios

    DEFF Research Database (Denmark)

    Weng, R.; Oehmen, Josef; Ben-Daya, M.

    2013-01-01

    Managing portfolios of development and engineering projects currently presents significant challenges to companies. This is even more the case in the management of portfolio risks, where both industry and academia currently lack a clear conceptual understanding of what portfolio risks are and what...

  17. Mapping cumulative environmental risks: examples from the EU NoMiracle project

    NARCIS (Netherlands)

    Pistocchi, A.; Groenwold, J.; Lahr, J.; Loos, M.; Mujica, M.; Ragas, A.M.J.; Rallo, R.; Sala, S.; Schlink, U.; Strebel, K.; Vighi, M.; Vizcaino, P.

    2011-01-01

    We present examples of cumulative chemical risk mapping methods developed within the NoMiracle project. The different examples illustrate the application of the concentration addition (CA) approach to pesticides at different scale, the integration in space of cumulative risks to individual organisms

  18. The Strategic Risk Management at Different Stages of Innovation Project

    OpenAIRE

    Pysmak Viktoriia O.

    2017-01-01

    This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried...

  19. The multiplier effect of the health education-risk reduction program in 28 states and 1 territory.

    Science.gov (United States)

    Kreuter, M W; Christensen, G M; Divincenzo, A

    1982-01-01

    The multiplier effect of the Health Education-Risk Reduction (HE-RR) Grants Program funded by the Public Health Service is examined to identify outcomes for the period 1978-81. Responses to a questionnaire from the directors of health education of 28 States and 1 Territory supplied the information concerning new health promotion activities generated by the program. The directors were asked to identify and give cost estimates of new activities that resulted from State-level and local intervention projects. A method for calculating the extent to which the HE-RR program influenced new health promotion activities that were funded by alternate sources was devised. The calculation, termed the new activity rate, was applied to the survey data. Rates calculated for the HE-RR program revealed that it generated nearly $4 million in new health promotion activities, most of them funded by the private and voluntary segments of society.

  20. Social Media Use and Sexual Risk Reduction Behavior Among Minority Youth: Seeking Safe Sex Information.

    Science.gov (United States)

    Stevens, Robin; Gilliard-Matthews, Stacia; Dunaev, Jamie; Todhunter-Reid, Abigail; Brawner, Bridgette; Stewart, Jennifer

    Sexual health is an important area of study-particularly for minority youth and youth living in disadvantaged neighborhoods. The purpose of the research was to examine the sources of sexual health information associated with youth adopting sexual risk reduction behaviors. Data collection took place in a small city in the Northeastern United States using cross-sectional behavioral surveys and modified venue-based sampling. Participants included 249 African American and Latino youth aged 13-24. Participants reported their sources of information about contraception and human immunodeficiency virus/sexually transmitted disease, such as TV/movies, parents, social media; their intentions to have sex; and condom and contraception use during their last sexual activity. Social media use, past pregnancy experience, past sexual history, age, and gender were also measured. Standard tests of bivariate association (chi-square and F tests) were used to examine initial associations between sexual risk reduction behavior and exposure to sexual risk reduction information on social media. Logistic regression models were used to test multivariate relationships between information sources and sexual risk reduction behavior. Youth who were exposed to sexual health messages on social media were 2.69 times (p < .05) and 2.49 times (p < .08) more likely to have used contraception or a condom at last intercourse, respectively. Parents, schools, or traditional media as information sources were not significantly associated with contractive use or condom use at last intercourse. Youth sexual behavior is increasingly informed by social media messages. Health practitioners should utilize social media as an important health promotion tool.

  1. Weather hazards and vulnerabilities for the European transport system - a risk panorama. EWENT project D5.1

    Energy Technology Data Exchange (ETDEWEB)

    Molarius, R.; Leviakangas, P.; Ronty, J.; Oiva, K. (eds.)

    2012-09-15

    This deliverable of EWENT project estimates the risks of extreme weather on European transport system. The main object of work package 5 in EWENT project was to perform a risk analysis based on impact and probability assessments carried out in earlier work packages (WP2-WP3). The results of WP 5 can be used as a starting point when deciding on the risk reduction measures, strategies and policies in the European Union. This deliverable also serves as a background material for the synthesis report (named shortly as Risk Panorama), which will summarise the findings of risk assessment and previous work packages. The methodological approach of EWENT is based on the generic risk management standard (IEC 60300-3-9) and starts with the identification of hazardous extreme weather phenomena, followed by an impact assessment and concluded by mitigation and risk control measures. This report pools the information from EWENT's earlier work packages, such as risk identification and estimation, into a 'risk panorama' and provides a holistic picture on the risks of extreme weather in different parts of Europe and EU transport network. The risk assessment is based on the definition of transport systems' vulnerability to extreme weather events in different countries and on calculations of the most probable causal chains, starting from adverse weather phenomena and ending up with events that pose harmful consequences to the transport systems in different climate regions. The latter part, the probabilistic section, is the hazard analysis. The vulnerability of a particular mode in a particular country is a function of exposure (indicated by transport or freight volumes and population density), susceptibility (infrastructure quality index, indicating overall resilience) and coping capacity (measured by GDP per capita). Hence, we define the extreme weather risk as Risk = hazard times vulnerability = P(negative consequences) times V[f(exposure, susceptibility, coping

  2. Risk management in methodologies of information technology and communications projects

    Directory of Open Access Journals (Sweden)

    Jonathan Carrillo

    2013-12-01

    Full Text Available (Received: 2013/10/02 - Accepted: 2013/12/13At present there are methodologies that have several alternatives and methods to manage projects of Information and Communication Technologies. However, these do not cover a solution for the technology events that can occur in the industry, government, education, among others. In the technology market there are several models to identify and analyze risks according to relevant aspects of their area of specialty e.g. projects, in software development, communications, information security and business alignment. For this reason, this research conducted an evaluation of risk management activities of the methodologies used mostly to know which of them includes more correspondence with basic elements of IT using a rating scale.

  3. Risk Identification and Assessment in PPP Infrastructure Projects using Fuzzy Analytical Hierarchy Process and Life-Cycle Methodology

    Directory of Open Access Journals (Sweden)

    Jie Li

    2012-11-01

    Full Text Available To fulfil the increasing demands of the public,Public Private Partnership (PPP has beenincreasingly used to procure infrastructureprojects, such as motor ways, bridges, tunnelsand railways. However, the risks involved inPPP projects are unique and dynamic due tolarge amount of investment and longconcession period. This paper aims to developa risk identification framework from theperspectives of project life cycle, and anassessment framework for risks associatedwith PPP project using fuzzy analyticalhierarchy process (AHP. First the paperreviews the current literature to identifycommon risks in PPP infrastructure projectsand classification methods used. The risksidentified from the literature were classifiedusing project life cycle perspectives. Followingthat, the paper presents the advantages offuzzy AHP. Furthermore, the paper provides aframework for assessment of risks in PPPprojects followed by an illustrative examplewhere the data was obtained from surveyquestionnaires. The paper concludes that risksassociated in PPP infrastructure projects areunique and therefore it is beneficial to classifythem from project life cycle perspectives, andthe proposed fuzzy AHP method is suitable forthe assessment of these risks.

  4. Risk reduction in road and rail LPG transportation bij passive fire protection

    NARCIS (Netherlands)

    Molag e.a., M. (Menso)

    2009-01-01

    The potential reduction of risk in LPG (Liquified Petroleum Gas) road transport due to the adoption of passive fire protectionswas investigated. Experimental data available for small scale vessels fully engulfed by a fire were extended to real scale road and rail tankers through a finite elements

  5. Risk reduction in road and rail LPG transportation by passive fire protection

    NARCIS (Netherlands)

    Paltrinieri, N.; Landucci, G.; Molag, M.; Bonvicini, S.; Spadoni, G.; Cozzani, V.

    2009-01-01

    The potential reduction of risk in LPG (Liquefied Petroleum Gas) road transport due to the adoption of passive fire protections was investigated. Experimental data available for small scale vessels fully engulfed by a fire were extended to real scale road and rail tankers through a finite elements

  6. Pure meat – public perceptions of risk reduction strategies in meat production

    DEFF Research Database (Denmark)

    Korzen, Sara Marie; Sandøe, Peter; Lassen, Jesper

    2011-01-01

    generally have an aversion to risk reduction strategies. Some variation was found, however, in the rejection of the strategies. Thus, more acceptable strategies are characterised by a low degree of technological interference, and by being close to the consumer’s experience in everyday life and/or familiar...

  7. The impact of parent involvement in an effective adolescent risk reduction intervention on sexual risk communication and adolescent outcomes.

    Science.gov (United States)

    Wang, Bo; Stanton, Bonita; Deveaux, Lynette; Li, Xiaoming; Koci, Veronica; Lunn, Sonja

    2014-12-01

    Parent involvement in prevention efforts targeting adolescents increases the impact of such programs. However, the majority of risk-reduction intervention programs that are implemented through schools do not include parents, in part because most existing parental interventions require significant time commitment by parents. We designed a brief parent-adolescent sexual risk communication intervention to be delivered with an effective HIV prevention intervention as part of a randomized, controlled trial among 2,564 grade 10 students and their parents in the Bahamas. Mixed effects modeling analysis was conducted to evaluate the effect of the brief parent-adolescent communication intervention using four waves of longitudinal data. Results indicate that a brief parent-adolescent communication intervention is effective in improving parent-adolescent communication on sex-related issues and perceived parental monitoring as well as the youth's condom use skills and self-efficacy. There is a marginal effect on consistent condom use. In addition, there is an apparent dose effect of the brief parent intervention on perceived parent-adolescent sexual risk communication and adolescent outcomes. These findings suggest that adolescent risk reduction interventions should include a brief parent-adolescent communication intervention that should be reinforced by periodic boosters in order to enhance the impact of adolescent HIV prevention programs.

  8. RISK ANALYSIS FOR SHIP CONVERTING PROJECT ACCOMPLISHMENT (Case study of KRI KP Converting Project

    Directory of Open Access Journals (Sweden)

    Dimas Endro W

    2013-10-01

    Full Text Available Ship converting has become as prospective activity in ship building area. Operational and economical aspect are the most dominant rationale. Baseon a new fuction of converted ship, a task list which contain several jobs that must be done is listed. This accomplishment schedule not only contain a task list, but also duration for certain job title. In practical apllication job duration is maintained based on experience of project manager.  Further more, total accomplish duration is setted as time accomplishment for the project. This setted time has become reference for the project bid. Occasionaly, if accomplishment time which offered is strict, than schedule slip become as potencial nightmare. For this situation, project manager has had a cristal clearconsideration to select a proper decision wheter he will take the tender offer or not. practically, project mananger has layed on his experience to handle previous project and face  penalty if the project delayed. This paper focussed on how to measure tender offer based on risk analysis, specially for converted ship tender which has a strike time accomplishment.A new application method to analysis proposed tender based on time and penalty parameter has become a topic of this paper.

  9. Risk analysis using AS/NZS 4360:2004, Bow-Tie diagram and ALARP on construction projects of Banyumanik Hospital

    Science.gov (United States)

    Sari, Diana Puspita; Pujotomo, Darminto; Wardani, Nadira Kusuma

    2017-11-01

    The Determination of risk is an uncertain event. Risks can have negative or positive impacts on project objectives. A project was defined as a series of activities and tasks that have a purpose, specifications, and limits of cost. Banyumanik Hospital Development Project is one of the construction projects in Semarang which have experienced some problems. The first problem is project delays on building stake. The second problem is delay of material supply. Finally, the problem that occurs is less management attention to health safety as evidenced by the unavailability of PPE for the workers. These problems will pose a risk to be a very important risk management performed by contractors at the Banyumanik Hospital Development Project to reduce the impact that would be caused by the risk borne by the provider of construction services. This research aim to risk identification, risk assessment and risk mitigation. Project risk management begins with the identification of risks based on the project life cycle. The risk assessment carried out by AS I NZS 4360: 2004 to the impacts of cost, time and quality. The results obtained from the method of AS I NZS 4360: 2004 is the risk that requires the handling of mitigation. Mitigated risk is the risk that had significant and high level. There are four risks that require risk mitigation with Bow-Tie diagrams which is work accidents, contract delays, material delays and design changes. Bow-Tie diagram method is a method for identifying causal and preventive action and recovery of a risk. Results obtained from Bow-Tie diagram method is a preventive action and recovery. This action is used as input to the ALARP method. ALARP method is used to determine the priority of the strategy proposed in the category broadly acceptable, tolerable, and unacceptable.

  10. Evaluation and financial risk management of urban renewal projects in partnership with public and private

    Directory of Open Access Journals (Sweden)

    Ehsan Hassani

    2011-10-01

    Full Text Available Financing plays an important role for renewal of old city building is find suitable financing plan. A proper financial management in one hand has a direct relationship with project main factors such as: time, cost and quality of the project, and on the other hand, achieving project goals requires a comprehensive insight of project, stockholders as well as other relative situation in regard with the project. Considering the complication of execution such projects and the number of shareholders, one of the best attitudes towards the project management is risk management. This research is a qualitative and practical, which reviews the effects of project management factors on financial return of urban renewal sachem. The required information gained through a survey and via questionnaire and interviews with specialists. This article first describes the public private financial partnership and then, based on the results gained from a case study done on one of the renewal schemes in Mashhad metropolitan areas. Next, it identifies and evaluates of positive and negative risks, which lead to threats and opportunities will be performed and will attempt to respond the existent risks. Finally, we provide a framework for the risk assessment of the housing units.

  11. Risk reduction for nonmelanoma skin cancer with childhood sunscreen use

    International Nuclear Information System (INIS)

    Stern, R.S.; Weinstein, M.C.; Baker, S.G.

    1986-01-01

    Exposure to ultraviolet radiation is the principle cause of basal and squamous cell carcinomas of the skin, which are the most frequent tumors occurring in white residents of the United States. Using a mathematical model based on epidemiologic data, we quantified the potential benefits of using a sunscreen with a sun protective factor of 15 and estimate that regular use of such a sunscreen during the first 18 years of life would reduce the lifetime incidence of these tumors by 78%. Additional benefits of sunscreen use during childhood include reduced risk of sunburn, retarding the pace of skin aging, and possible reduction in melanoma risk. We recommend that pediatricians encourage sunscreen use and sun avoidance as a regular part of pediatric preventive health care

  12. Allocating risk capital for a brownfields redevelopment project under hydrogeological and financial uncertainty.

    Science.gov (United States)

    Yu, Soonyoung; Unger, Andre J A; Parker, Beth; Kim, Taehee

    2012-06-15

    In this study, we defined risk capital as the contingency fee or insurance premium that a brownfields redeveloper needs to set aside from the sale of each house in case they need to repurchase it at a later date because the indoor air has been detrimentally affected by subsurface contamination. The likelihood that indoor air concentrations will exceed a regulatory level subject to subsurface heterogeneity and source zone location uncertainty is simulated by a physics-based hydrogeological model using Monte Carlo realizations, yielding the probability of failure. The cost of failure is the future value of the house indexed to the stochastic US National Housing index. The risk capital is essentially the probability of failure times the cost of failure with a surcharge to compensate the developer against hydrogeological and financial uncertainty, with the surcharge acting as safety loading reflecting the developers' level of risk aversion. We review five methodologies taken from the actuarial and financial literature to price the risk capital for a highly stylized brownfield redevelopment project, with each method specifically adapted to accommodate our notion of the probability of failure. The objective of this paper is to develop an actuarially consistent approach for combining the hydrogeological and financial uncertainty into a contingency fee that the brownfields developer should reserve (i.e. the risk capital) in order to hedge their risk exposure during the project. Results indicate that the price of the risk capital is much more sensitive to hydrogeological rather than financial uncertainty. We use the Capital Asset Pricing Model to estimate the risk-adjusted discount rate to depreciate all costs to present value for the brownfield redevelopment project. A key outcome of this work is that the presentation of our risk capital valuation methodology is sufficiently generalized for application to a wide variety of engineering projects. Copyright © 2012 Elsevier

  13. The impact of the human genome project on risk assessment

    International Nuclear Information System (INIS)

    Katarzyna Doerffer; Paul Unrau.

    1996-01-01

    The radiation protection approach to risk assessment assumes that cancer induction following radiation exposure is purely random. Present risk assessment methods derive risk from cancer incidence frequencies in exposed populations and associate disease outcomes totally with the level of exposure to ionizing red aeon. Exposure defines a risk factor that affects the probability of the disease outcome. But cancer risk can be affected by other risk factors such as underlying genetic factors (predisposition) of the exposed organism. These genetic risk factors are now becoming available for incorporation into ionizing radiation risk assessment Progress in the Human Genome Project (HOP) will lead to direct assays to measure the effects of genetic risk determinants in disease outcomes. When all genetic risk determinants are known and incorporated into risk assessment it will be possible to reevaluate the role of ionizing radiation in the causation of cancer. (author)

  14. Landslide risk impact management and web services for improving resilience: the LIFE+IMAGINE project approach

    Science.gov (United States)

    Congi, Maria Pia; Campo, Valentina; Cipolloni, Carlo; Delmonaco, Giuseppe; Guerrieri, Luca; Iadanza, Carla; Spizzichino, Daniele; Trigila, Alessandro

    2014-05-01

    The increasing damage caused by natural disasters in the last decades points out the need for interoperable added-value services to support environmental safety and human protection, by reducing vulnerability of exposed elements as well as improving the resilience of the involved communities. For this reason, to provide access to harmonized and customized data is only one of several steps towards delivering adequate support to risk assessment, reduction and management. Scope of the present work is to illustrate a methodology under development for analysis of potential impacts in areas prone to landslide hazard in the framework of the EC project LIFE+IMAGINE. The project aims to implement an infrastructure based on web services for environmental analysis, that integrates in its own architecture specifications and results from INSPIRE, SEIS and GMES. Existing web services will be customized during the project to provide functionalities for supporting the environmental integrated management. The implemented infrastructure will be applied to landslide risk scenarios, to be developed in selected pilot areas, aiming at: i) application of standard procedures to implement a landslide risk analysis; ii) definition of a procedure for assessment of potential environmental impacts, based on a set of indicators to estimate the different exposed elements with their specific vulnerability in the pilot area. More in detail, the landslide pilot will be aimed at providing a landslide risk scenario through the implementation and analysis of: 1) a landslide inventory from available historical databases and maps; 2) landslide susceptibility and hazard maps; 3) assessment of exposure and vulnerability on selected typologies of elements at risk; 4) implementation of a landslide risk scenario for different sets of exposed elements (e.g. population, road network, residential area, cultural heritage). The pilot will be implemented in Liguria, Italy, in two different catchment areas located

  15. A Case Analysis of Disaster Risk Reduction Preparedness of Iloilo Province: Basis for A Comprehensive Intervention Program

    Directory of Open Access Journals (Sweden)

    Victoria D. Jurilla

    2016-08-01

    Full Text Available - This study determined the effectiveness of Disaster Risk Reduction Preparedness of Iloilo Province, Philippines in the areas of Dissemination, Implementation, and Resource Utilization and Operation as evaluated by the 390 citizens of the ten (10 selected municipalities from the five (5 Congressional Districts in the Province of Iloilo, Philippines. This descriptive method of research employed researcher-made instruments and random interviews. Descriptive statistics used were the mean and standard deviation while inferential statistics employed Ttest for independent samples and one-way analysis for variance set at .05 level of significances. Findings revealed that Disaster Risk Reduction Preparedness of Iloilo Province, Philippines is “more effective” in terms of dissemination, implementation, and resource utilization and operation according to the assessment of the 390 respondents of the ten (10 selected municipalities from the five (5 Congressional Districts when they were grouped as to personal variables. Finally, the findings revealed that three (3 out of ten (10 municipalities were very effective and among the five (5 districts, first district was very effective as to dissemination and resource utilization and operation of their respective Disaster Risk Reduction Preparedness Program but as a whole, Iloilo Province was more effective in its Disaster Risk Reduction Preparedness.

  16. Statistically downscaled climate projections to support evaluating climate change risks for hydropower

    International Nuclear Information System (INIS)

    Brekke, L.

    2008-01-01

    This paper described a web-served public access archive of down-scaled climate projections developed as a tool for water managers of river and hydropower systems. The archive provided access to climate projection data at basin-relevant resolution and included an extensive compilation of down-scale climate projects designed to support risk-based adaptation planning. Downscaled translations of 112 contemporary climate projections produced using the World Climate Research Program's coupled model intercomparison project were also included. Datasets for the coupled model included temperature and precipitation, monthly time-steps, and geographic coverage for the United States and portions of Mexico and Canada. It was concluded that the archive will be used to develop risk-based studies on shifts in seasonal patterns, changes in mean annual runoff, and associated responses in water resources and hydroelectric power management. Case studies demonstrating reclamation applications of archive content and potential applications for hydroelectric power production impacts were included. tabs., figs

  17. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    Science.gov (United States)

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. RISK MANAGEMENT IN THE OPERATING ACTIVITIES OF AN ENTERPRISE AND IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

    Directory of Open Access Journals (Sweden)

    Lech Jędrzejewski

    2017-03-01

    Full Text Available The paper is devoted to issues related to building a risk management system for businesses in the areas of operations and implementation of infrastructure projects. The article defines the concept of risk in business processes and identifies risks occurring in infrastructure projects. In the text, the principles have been presented for protection against the effects of political, contracting, environmental, ecological, product, process, operational and personnel risk.

  19. Family-based risk reduction of obesity and metabolic syndrome: an overview and outcomes of the Idaho Partnership for Hispanic Health.

    Science.gov (United States)

    Schwartz, Rachel; Powell, Linda; Keifer, Matthew

    2013-01-01

    Mexican American women have the highest incidence of metabolic syndrome among all U.S. demographic groups. This paper details an innovative approach to reducing the risks for metabolic syndrome among Hispanic families in rural Idaho. Compañeros en Salud (CeS) is a promotora-led wellness program and community-based participatory research project from the Idaho Partnership for Hispanic Health. As behavior change is the first line of prevention and treatment of obesity and metabolic syndrome, the program aimed to improve nutrition and physical activity behaviors as well as increase community support and infrastructure for healthy living. CeS has demonstrated substantial improvement in health outcomes, with statistically significant reductions in weight, BMI, metabolic syndrome risk, A1c, glucose, blood pressure, and cholesterol, from pre-intervention to post-intervention and/or pre-intervention to one-year follow-up. These outcomes suggest the CeS model as a promising best practice for effecting individual and family-level physiologic and behavioral outcomes for obesity prevention.

  20. OPPORTUNITIES AND RISKS IN A CONTROL SYSTEM OF INNOVATIVE PROJECTS OF ORGANIZATIONAL DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    A.V. Grebenkin

    2008-06-01

    Full Text Available The definition of the organizational development innovative project and the technique of its estimation is in this article offered. The distinctive special feature of this method is comparison of opportunities and risks by means of essentially new system of the parameters. These parameters allow to receive a complex estimation of a condition of organizational development innovative projects. Approbation of the offered estimated technique has been lead on set of organizational development innovative projects which were realized at the enterprises of a various branch accessory. The hypothesis about necessity of definition of a condition of the project by means of an estimation of opportunities and their comparisons to risks is confirmed.

  1. Teaching medical students cancer risk reduction nutrition counseling using a multimedia program.

    Science.gov (United States)

    Kolasa, K M; Jobe, A C; Miller, M G; Clay, M C

    1999-03-01

    There are many barriers to medical students receiving education about the linkage between nutrition and cancer, including the lack of role models and teachers and insufficient curricular time. We tested the use of a multimedia program as a possible solution to teaching diet-risk assessment and counseling skills. Images of Cancer Prevention, The Nutrition Link is a CD-ROM multimedia program that was developed and evaluated by 147 medical students. Pre-use and post-use surveys, computer log files, and recorded response sessions were used to determine the learner's 1) ease in using the program, 2) attitudes about the treatment of the content, 3) knowledge gain, and 4) attitudes about the role of physicians in nutrition assessment and counseling for cancer risk reduction. Students improved their knowledge of dietary guidelines for cancer risk reduction and made positive changes in their attitudes toward the role of physicians in dietary counseling. However, most students reported that they would not use the program unless it was required that they do so. The multimedia program was successful; it affected students' knowledge and attitudes concerning nutrition as a modifiable risk factor for some cancers. In addition, the design and delivery of the multimedia product was positively reviewed by the students for ease of access, message design, individualized instruction, and flexibility. Despite these favorable ratings, it was not clear that students would use the program unless required to do so.

  2. Synergising Public Health Concepts with the Sendai Framework for Disaster Risk Reduction: A Conceptual Glossary.

    Science.gov (United States)

    Phibbs, Suzanne; Kenney, Christine; Severinsen, Christina; Mitchell, Jon; Hughes, Roger

    2016-12-14

    The Sendai Framework for Disaster Risk Reduction (2015) is a global strategy for addressing disaster risk and resilience that has been ratified by member countries of the United Nations. Its guiding principles emphasise building resilience through inter-sectoral collaboration, as well as partnerships that facilitate community empowerment and address underlying risk factors. Both public health and the emergency management sector face similar challenges related to developing and implementing strategies that involve structural change, facilitating community resilience and addressing individual risk factors. Familiarity with public health principles enables an understanding of the holistic approach to risk reduction that is outlined within the Sendai Framework. We present seven concepts that resonate with contemporary public health practice, namely: the social determinants of health; inequality and inequity; the inverse care law; community-based and community development approaches; hard to reach communities and services; the prevention paradox; and the inverse prevention law. These ideas from public health provide a useful conceptual base for the "new" agenda in disaster risk management that underpins the 2015 Sendai Framework. The relevance of these ideas to disaster risk management and research is illustrated through drawing on the Sendai Framework, disaster literature and exemplars from the 2010-2011 earthquakes in Canterbury, New Zealand.

  3. Synergising Public Health Concepts with the Sendai Framework for Disaster Risk Reduction: A Conceptual Glossary

    Directory of Open Access Journals (Sweden)

    Suzanne Phibbs

    2016-12-01

    Full Text Available The Sendai Framework for Disaster Risk Reduction (2015 is a global strategy for addressing disaster risk and resilience that has been ratified by member countries of the United Nations. Its guiding principles emphasise building resilience through inter-sectoral collaboration, as well as partnerships that facilitate community empowerment and address underlying risk factors. Both public health and the emergency management sector face similar challenges related to developing and implementing strategies that involve structural change, facilitating community resilience and addressing individual risk factors. Familiarity with public health principles enables an understanding of the holistic approach to risk reduction that is outlined within the Sendai Framework. We present seven concepts that resonate with contemporary public health practice, namely: the social determinants of health; inequality and inequity; the inverse care law; community-based and community development approaches; hard to reach communities and services; the prevention paradox; and the inverse prevention law. These ideas from public health provide a useful conceptual base for the ”new” agenda in disaster risk management that underpins the 2015 Sendai Framework. The relevance of these ideas to disaster risk management and research is illustrated through drawing on the Sendai Framework, disaster literature and exemplars from the 2010–2011 earthquakes in Canterbury, New Zealand.

  4. Risk level project. Summary report, Norwegian Shelf, Phase 7; Risikonivaaprosjektet. Sammendragsrapport Norsk Sokkel, fase 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    The project 'developments in risk level - Norwegian shelf', also known as the risk level project, was initiated by the Norwegian Petroleum Directorate in 2000. From 2004 the project has been continued by Petroleum Safety Authority Norway. The project's main objectives are to measure the effect of the health, security and environment (HSE) work in the industry, and contribute to identify the areas critical to HSE, where efforts must be made to prevent unwanted events or accidents. A summary report with results from phase 7 in the project (ml)

  5. Copper increases reductive dehalogenation of haloacetamides by zero-valent iron in drinking water: Reduction efficiency and integrated toxicity risk.

    Science.gov (United States)

    Chu, Wenhai; Li, Xin; Bond, Tom; Gao, Naiyun; Bin, Xu; Wang, Qiongfang; Ding, Shunke

    2016-12-15

    The haloacetamides (HAcAms), an emerging class of nitrogen-containing disinfection byproducts (N-DBPs), are highly cytotoxic and genotoxic, and typically occur in treated drinking waters at low μg/L concentrations. Since many drinking distribution and storage systems contain unlined cast iron and copper pipes, reactions of HAcAms with zero-valent iron (ZVI) and metallic copper (Cu) may play a role in determining their fate. Moreover, ZVI and/or Cu are potentially effective HAcAm treatment technologies in drinking water supply and storage systems. This study reports that ZVI alone reduces trichloroacetamide (TCAcAm) to sequentially form dichloroacetamide (DCAcAm) and then monochloroacetamide (MCAcAm), whereas Cu alone does not impact HAcAm concentrations. The addition of Cu to ZVI significantly improved the removal of HAcAms, relative to ZVI alone. TCAcAm and their reduction products (DCAcAm and MCAcAm) were all decreased to below detection limits at a molar ratio of ZVI/Cu of 1:1 after 24 h reaction (ZVI/TCAcAm = 0.18 M/5.30 μM). TCAcAm reduction increased with the decreasing pH from 8.0 to 5.0, but values from an integrated toxic risk assessment were minimised at pH 7.0, due to limited removal MCAcAm under weak acid conditions (pH = 5.0 and 6.0). Higher temperatures (40 °C) promoted the reductive dehalogenation of HAcAms. Bromine was preferentially removed over chlorine, thus brominated HAcAms were more easily reduced than chlorinated HAcAms by ZVI/Cu. Although tribromoacetamide was more easily reduced than TCAcAm during ZVI/Cu reduction, treatment of tribromoacetamide resulted in a higher integrated toxicity risk than TCAcAm, due to the formation of monobromoacetamide (MBAcAm). Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Innovative Surveillance and Risk Reduction Systems for Family Maltreatment, Suicidality, and Substance Problems in USAF

    National Research Council Canada - National Science Library

    Slep, Amy M; Heyman, Richard E

    2007-01-01

    This project aims to enhance the capacity of the Air Force (AF) to reduce death, injury, and degraded force readiness via reduction of the prevalence and impact of family maltreatment, suicidality, and alcohol/drug problems...

  7. Innovative Surveillance and Risk Reduction Systems for Family Maltreatment, Suicidality, and Substance Problems in USAF

    National Research Council Canada - National Science Library

    Smith, Amy M; Heyman, Richard E

    2005-01-01

    This project aims to enhance the capacity of the Air Force (AF) to reduce death, injury, and degraded force readiness via reduction of the prevalence and impact of family maltreatment, suicidality, and alcohol/drug problems...

  8. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  9. Environmental Assessment: Bird Strike Risk Reduction at Laughlin Air Force Base, Texas

    Science.gov (United States)

    2008-01-01

    mglkg in rats, 291 - 609 mglkg in mice, > 1000 mglkg in sheep , > 100 mglkg in dogs and > 1000 mglkg in rabbits (Pesticide Residues in Food-1987... vineyards . Wildl. Soc. Bull. 21:47-51. LAFB Strike Risk Reduction EA - 39 Gaines, T.B. 1969. Acute toxicity of pesticides. Toxicol. Appl. Pharmacol

  10. Development of risk reduction behavioral counseling for Ebola virus disease survivors enrolled in the Sierra Leone Ebola Virus Persistence Study, 2015-2016.

    Science.gov (United States)

    Abad, Neetu; Malik, Tasneem; Ariyarajah, Archchun; Ongpin, Patricia; Hogben, Matthew; McDonald, Suzanna L R; Marrinan, Jaclyn; Massaquoi, Thomas; Thorson, Anna; Ervin, Elizabeth; Bernstein, Kyle; Ross, Christine; Liu, William J; Kroeger, Karen; Durski, Kara N; Broutet, Nathalie; Knust, Barbara; Deen, Gibrilla F

    2017-09-01

    During the 2014-2016 West Africa Ebola Virus Disease (EVD) epidemic, the public health community had concerns that sexual transmission of the Ebola virus (EBOV) from EVD survivors was a risk, due to EBOV persistence in body fluids of EVD survivors, particularly semen. The Sierra Leone Ebola Virus Persistence Study was initiated to investigate this risk by assessing EBOV persistence in numerous body fluids of EVD survivors and providing risk reduction counseling based on test results for semen, vaginal fluid, menstrual blood, urine, rectal fluid, sweat, tears, saliva, and breast milk. This publication describes implementation of the counseling protocol and the key lessons learned. The Ebola Virus Persistence Risk Reduction Behavioral Counseling Protocol was developed from a framework used to prevent transmission of HIV and other sexually transmitted infections. The framework helped to identify barriers to risk reduction and facilitated the development of a personalized risk-reduction plan, particularly around condom use and abstinence. Pre-test and post-test counseling sessions included risk reduction guidance, and post-test counseling was based on the participants' individual test results. The behavioral counseling protocol enabled study staff to translate the study's body fluid test results into individualized information for study participants. The Ebola Virus Persistence Risk Reduction Behavioral Counseling Protocol provided guidance to mitigate the risk of EBOV transmission from EVD survivors. It has since been shared with and adapted by other EVD survivor body fluid testing programs and studies in Ebola-affected countries.

  11. Balancing risk in regulatory decision making: the Port Granby Project case study

    International Nuclear Information System (INIS)

    Benitez, L.; Kleb, H.

    2011-01-01

    The purpose of this paper is to review the trade-offs that are routinely considered in regulatory decision making, and the policy basis and methods for making those trade-offs. Regulatory decisions under the Canadian Environmental Assessment Act (CEAA) and the Nuclear Safety and Control Act (NSCA) normally consider potential risks to the environment, human health and safety, if a project were to proceed. There is only limited consideration, under such circumstances, of the risks to the environment, human health and safety if the project were not to proceed. The focus is on the potential adverse effects of the project, except in the event of an emergency, where the focus shifts to the economic and other beneficial effects. The Port Granby long-term low-level radioactive waste management project is a project to clean up and provide appropriate local, long-term management of historic low-level radioactive waste (LLRW) in the Port Granby, Ontario area. Approximately 0.4 M m 3 of LLRW, presently located at the Port Granby Waste Management Facility, is to be transported to a newly constructed long-term waste management facility ~700 m north of the bluff face where the facility is located. Accordingly, the project is subject to environmental assessment and licensing processes under the CEAA and the NSCA, respectively. While the Port Granby Project does not represent an emergency situation, it does represent a situation that could result in a significant degree of environmental risk if the project were not to proceed. Over the course of the various studies that have been undertaken at the Waste Management Facility, it has become apparent that the facility is subject to erosion and gullying along the bluff face. The potential for the leaching of contaminants from the existing facility and the erosion of the Lake Ontario bluffs are recognized as ongoing risks that will continue and potentially worsen if the project does not proceed. The economic and other considerations that

  12. Modelling of risk events with uncertain likelihoods and impacts in large infrastructure projects

    DEFF Research Database (Denmark)

    Schjær-Jacobsen, Hans

    2010-01-01

    to prevent future budget overruns. One of the central ideas is to introduce improved risk management processes and the present paper addresses this particular issue. A relevant cost function in terms of unit prices and quantities is developed and an event impact matrix with uncertain impacts from independent......This paper presents contributions to the mathematical core of risk and uncertainty management in compliance with the principles of New Budgeting laid out in 2008 by the Danish Ministry of Transport to be used in large infrastructure projects. Basically, the new principles are proposed in order...... uncertain risk events is used to calculate the total uncertain risk budget. Cost impacts from the individual risk events on the individual project activities are kept precisely track of in order to comply with the requirements of New Budgeting. Additionally, uncertain likelihoods for the occurrence of risk...

  13. Emotional confidence levels and success of tourism development for poverty reduction: The South African Kwam eMakana home-stay project.

    NARCIS (Netherlands)

    Kwaramba, H.M.; Lovett, Jonathan Cranidge; Louw, L.; Chipumuro, J.

    2012-01-01

    Poverty reduction is a central component of South African government local economic development (LED) programmes. The Grahamstown Kwame Makana pilot project for promotion of tourism homestays aims to assist disadvantaged women to become self-reliant entrepreneurs. However the project has only met

  14. Toward a Stakeholder Perspective on Social Stability Risk of Large Hydraulic Engineering Projects in China: A Social Network Analysis

    Directory of Open Access Journals (Sweden)

    Zhengqi He

    2018-04-01

    Full Text Available In China, large hydraulic engineering projects have made a great contribution to social economic development; at the same time, they also lead to social risks that affect social stability. The pluralism of stakeholders in large hydraulic engineering projects and the complex interrelationship among stakeholders are the important factors affecting social stability risk. Previous studies of social stability risk have mainly focused on risk identification and risk assessment, without considering the relationships among stakeholders and their linkages of risks. For large hydraulic engineering projects, this paper investigated the relevant risk factors and their interrelationships through a literature review and interviews that represented stakeholder perspectives. The key social stability risk factors were identified based on social network analysis. A multi-channel project financial system, a perfect interest compensation mechanism, an efficient prevention mechanism of group events, and a complete project schedule control system were proposed to mitigate the social stability risks. This study combined stakeholder management with risk management by using social network analysis, providing reference for the social stability risk management of large engineering projects in China.

  15. Reduction of Perceived Social Distance as an Explanation for Media's Influence on Personal Risk Perceptions: A Test of the Risk Convergence Model

    Science.gov (United States)

    So, Jiyeon; Nabi, Robin

    2013-01-01

    The risk convergence model proposes reduction of perceived social distance to a mediated personality as a mechanism through which the mass media can influence audiences' personal risk perceptions. As an initial test of the model, this study examined whether 5 audience variables known to facilitate media effects on personal risk…

  16. A comparison of mantle versus involved-field radiotherapy for Hodgkin's lymphoma: reduction in normal tissue dose and second cancer risk

    International Nuclear Information System (INIS)

    Koh, Eng-Siew; Paul, Narinder; Hodgson, David C; Tran, Tu Huan; Heydarian, Mostafa; Sachs, Rainer K; Tsang, Richard W; Brenner, David J; Pintilie, Melania; Xu, Tony; Chung, June

    2007-01-01

    Hodgkin's lymphoma (HL) survivors who undergo radiotherapy experience increased risks of second cancers (SC) and cardiac sequelae. To reduce such risks, extended-field radiotherapy (RT) for HL has largely been replaced by involved field radiotherapy (IFRT). While it has generally been assumed that IFRT will reduce SC risks, there are few data that quantify the reduction in dose to normal tissues associated with modern RT practice for patients with mediastinal HL, and no estimates of the expected reduction in SC risk. Organ-specific dose-volume histograms (DVH) were generated for 41 patients receiving 35 Gy mantle RT, 35 Gy IFRT, or 20 Gy IFRT, and integrated organ mean doses were compared for the three protocols. Organ-specific SC risk estimates were estimated using a dosimetric risk-modeling approach, analyzing DVH data with quantitative, mechanistic models of radiation-induced cancer. Dose reductions resulted in corresponding reductions in predicted excess relative risks (ERR) for SC induction. Moving from 35 Gy mantle RT to 35 Gy IFRT reduces predicted ERR for female breast and lung cancer by approximately 65%, and for male lung cancer by approximately 35%; moving from 35 Gy IFRT to 20 Gy IFRT reduces predicted ERRs approximately 40% more. The median reduction in integral dose to the whole heart with the transition to 35 Gy IFRT was 35%, with a smaller (2%) reduction in dose to proximal coronary arteries. There was no significant reduction in thyroid dose. The significant decreases estimated for radiation-induced SC risks associated with modern IFRT provide strong support for the use of IFRT to reduce the late effects of treatment. The approach employed here can provide new insight into the risks associated with contemporary IFRT for HL, and may facilitate the counseling of patients regarding the risks associated with this treatment

  17. Framework for Testing the Effectiveness of Bat and Eagle Impact-Reduction Strategies at Wind Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin [National Renewable Energy Lab. (NREL), Golden, CO (United States); DeGeorge, Elise [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-04-13

    The objectives of this framework are to facilitate the study design and execution to test the effectiveness of bat and eagle impact-reduction strategies at wind energy sites. Through scientific field research, the wind industry and its partners can help determine if certain strategies are ready for operational deployment or require further development. This framework should be considered a living document to be improved upon as fatality-reduction technologies advance from the initial concepts to proven readiness (through project- and technology-specific testing) and as scientific field methods improve.

  18. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  19. Suicide risk reduction in youths with attention-deficit/hyperactivity disorder prescribed methylphenidate: A Taiwan nationwide population-based cohort study.

    Science.gov (United States)

    Liang, Sophie Hsin-Yi; Yang, Yao-Hsu; Kuo, Ting-Yu; Liao, Yin-To; Lin, Tzu-Chin; Lee, Yena; McIntyre, Roger S; Kelsen, Brent A; Wang, Tsu-Nai; Chen, Vincent Chin-Hung

    2018-01-01

    Attention-deficit/hyperactivity disorder (ADHD) youths have increased suicide risk. Nevertheless, the beneficial effects of methylphenidate (MPH) on suicide attempt have received relatively little attention. To investigate the MPH usage and the risk of suicide attempt among ADHD youths. We identified 84,898 youths less than 18 years old with ADHD diagnosis between 1997 and 2013 from National Health Insurance, and examined whether MPH use affected suicide attempt risk using Cox proportional-hazards models. Among ADHD youths, reduction of suicide risk was found in patients prescribed 90-180days of MPH after adjusting for confounding factors (hazard ratio (HR): 0.41, 95% confidence interval (CI): 0.19-0.90) and a greater reduction in those prescribed more than 180days of MPH (HR: 0.28, 95% CI: 0.17-0.48). We observed a 59% suicide attempt risk reduction among ADHD youths prescribed between 90 and 180days and a 72% risk reduction in those prescribed more than 180days of MPH. The protective benefit observed by the group prescribed MPH for longer duration underscores the importance of psychoeducation and compliance enhancement as part of ADHD management. Indication bias is identified as a limitation of this study, and future self-case control study to investigate the association between suicide attempt and ADHD medication is suggested. This nationwide population-based cohort study showed that among ADHD youths, reduction of suicide risk was observed in patients prescribed MPH for duration 90days and longer, underscoring the importance of appropriate ADHD pharmacotherapy and enhancing drug compliance. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  20. Assessing reservoir performance risk in CO{sub 2} storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, A.R. [URS Corp., San Francisco, CA (United States); Rigg, A. [CRC for Greenhouse Gas Technologies, Canberra (Australia)

    2005-07-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO{sub 2}) has been the development of a proper methodology to assess and compare alternative CO{sub 2} injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO{sub 2}, and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO{sub 2} injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO{sub 2} injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs.