Sample records for risk projections models

  1. Modeling Research Project Risks with Fuzzy Maps

    Science.gov (United States)

    Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana

    2009-01-01

    The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…

  2. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  3. Improvement of the projection models for radiogenic cancer risk

    International Nuclear Information System (INIS)

    Tong Jian

    2005-01-01

    Calculations of radiogenic cancer risk are based on the risk projection models for specific cancer sites. Improvement has been made for the parameters used in the previous models including introductions of mortality and morbidity risk coefficients, and age-/ gender-specific risk coefficients. These coefficients have been applied to calculate the radiogenic cancer risks for specific organs and radionuclides under different exposure scenarios. (authors)

  4. Risk Assessment of Engineering Project Financing Based on PPP Model

    Directory of Open Access Journals (Sweden)

    Ma Qiuli

    2017-01-01

    Full Text Available At present, the project financing channel is single, and the urban facilities are in short supply, and the risk assessment and prevention mechanism of financing should be further improved to reduce the risk of project financing. In view of this, the fuzzy comprehensive evaluation model of project financing risk which combined the method of fuzzy comprehensive evaluation and analytic hierarchy process is established. The scientificalness and effectiveness of the model are verified by the example of the world port project in Luohe city, and it provides basis and reference for engineering project financing based on PPP mode.

  5. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  6. Dealing with project complexity by matrix-based propagation modelling for project risk analysis

    OpenAIRE

    Fang , Chao; Marle , Franck

    2012-01-01

    International audience; Engineering projects are facing a growing complexity and are thus exposed to numerous and interdependent risks. In this paper, we present a quantitative method for modelling propagation behaviour in the project risk network. The construction of the network requires the involvement of the project manager and related experts using the Design Structure Matrix (DSM) method. A matrix-based risk propagation model is introduced to calculate risk propagation and thus to re-eva...

  7. Comparison of additive (absolute) risk projection models and multiplicative (relative) risk projection models in estimating radiation-induced lifetime cancer risk

    International Nuclear Information System (INIS)

    Kai, Michiaki; Kusama, Tomoko

    1990-01-01

    Lifetime cancer risk estimates depend on risk projection models. While the increasing lengths of follow-up observation periods of atomic bomb survivors in Hiroshima and Nagasaki bring about changes in cancer risk estimates, the validity of the two risk projection models, the additive risk projection model (AR) and multiplicative risk projection model (MR), comes into question. This paper compares the lifetime risk or loss of life-expectancy between the two projection models on the basis of BEIR-III report or recently published RERF report. With Japanese cancer statistics the estimates of MR were greater than those of AR, but a reversal of these results was seen when the cancer hazard function for India was used. When we investigated the validity of the two projection models using epidemiological human data and animal data, the results suggested that MR was superior to AR with respect to temporal change, but there was little evidence to support its validity. (author)

  8. Revenue Risk Modelling and Assessment on BOT Highway Project

    Science.gov (United States)

    Novianti, T.; Setyawan, H. Y.

    2018-01-01

    The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.

  9. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  10. Decision Model on Financing a Project Using Knowledge about Risk Areas

    OpenAIRE

    Ioana POPOVICI; Emil SCARLAT; Francesco RIZZO

    2011-01-01

    The research presents an alternative to the classical method of measuring financial risk in funding a project. The goal of the model described in the paper implies identifying "risky areas" within the financial balance of the project. The model analysis the financial risk behavior studied along four scenarios by varying only the cost of financing source used according to the specific type of funding. The model introduces the time factor into the analysis of financial risk due to the specific ...

  11. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  12. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  13. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  14. Mixtures of beta distributions in models of the duration of a project affected by risk

    Science.gov (United States)

    Gładysz, Barbara; Kuchta, Dorota

    2017-07-01

    This article presents a method for timetabling a project affected by risk. The times required to carry out tasks are modelled using mixtures of beta distributions. The parameters of these beta distributions are given by experts: one corresponding to the duration of a task in stable conditions, with no risks materializing, and the other corresponding to the duration of a task in the case when risks do occur. Finally, a case study will be presented and analysed: the project of constructing a shopping mall in Poland.

  15. The longevity risk of the Dutch Actuarial Association’s projection model

    NARCIS (Netherlands)

    F. Peters (Frederick); W.J. Nusselder (Wilma); J.P. Mackenbach (Johan)

    2012-01-01

    markdownabstractAccurate assessment of the risk that arises from further increases in life expectancy is crucial for the financial sector, in particular for pension funds and life insurance companies. The Dutch Actuarial Association presented a revised projection model in 2010, while in the same

  16. Risk assessment by integrating interpretive structural modeling and Bayesian network, case of offshore pipeline project

    International Nuclear Information System (INIS)

    Wu, Wei-Shing; Yang, Chen-Feng; Chang, Jung-Chuan; Château, Pierre-Alexandre; Chang, Yang-Chi

    2015-01-01

    The sound development of marine resource usage relies on a strong maritime engineering industry. The perilous marine environment poses the highest risk to all maritime work. It is therefore imperative to reduce the risk associated with maritime work by using some analytical methods other than engineering techniques. This study addresses this issue by using an integrated interpretive structure modeling (ISM) and Bayesian network (BN) approach in a risk assessment context. Mitigating or managing maritime risk relies primarily on domain expert experience and knowledge. ISM can be used to incorporate expert knowledge in a systematic manner and helps to impose order and direction on complex relationships that exist among system elements. Working with experts, this research used ISM to clearly specify an engineering risk factor relationship represented by a cause–effect diagram, which forms the structure of the BN. The expert subjective judgments were further transformed into a prior and conditional probability set to be embedded in the BN. We used the BN to evaluate the risks of two offshore pipeline projects in Taiwan. The results indicated that the BN can provide explicit risk information to support better project management. - Highlights: • We adopt an integrated method for risk assessment of offshore pipeline projects. • We conduct semi-structural interview with the experts for risk factor identification. • Interpretive structural modeling helps to form the digraph of Bayesian network (BN) • We perform the risk analysis with the experts by building a BN. • Risk evaluations of two case studies using the BN show effectiveness of the methods

  17. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  18. Modelling financial risk in open pit mine projects: Implications for strategic decision-making

    OpenAIRE

    Abdel Sabour, S.A.; Wood, G.

    2009-01-01

    Strategic decisions in the mining industry are made under multiple technical and market uncertainties. Therefore, to reach the best possible decision, based on information available, it is necessary to integrate uncertainty about the input variables and model financial risk of the project's merit measures. However, this rovides few useful insights to decision-makers unless accompanied by modeling management responses to uncertainty resolutions. It is widely acknowledged that conventional deci...

  19. Multi-Model Projections of River Flood Risk in Europe under Global Warming

    Directory of Open Access Journals (Sweden)

    Lorenzo Alfieri

    2018-01-01

    Full Text Available Knowledge on the costs of natural disasters under climate change is key information for planning adaptation and mitigation strategies of future climate policies. Impact models for large scale flood risk assessment have made leaps forward in the past few years, thanks to the increased availability of high resolution climate projections and of information on local exposure and vulnerability to river floods. Yet, state-of-the-art flood impact models rely on a number of input data and techniques that can substantially influence their results. This work compares estimates of river flood risk in Europe from three recent case studies, assuming global warming scenarios of 1.5, 2, and 3 degrees Celsius from pre-industrial levels. The assessment is based on comparing ensemble projections of expected damage and population affected at country level. Differences and common points between the three cases are shown, to point out main sources of uncertainty, strengths, and limitations. In addition, the multi-model comparison helps identify regions with the largest agreement on specific changes in flood risk. Results show that global warming is linked to substantial increase in flood risk over most countries in Central and Western Europe at all warming levels. In Eastern Europe, the average change in flood risk is smaller and the multi-model agreement is poorer.

  20. Projecting Sexual and Injecting HIV Risks into Future Outcomes with Agent-Based Modeling

    Science.gov (United States)

    Bobashev, Georgiy V.; Morris, Robert J.; Zule, William A.

    Longitudinal studies of health outcomes for HIV could be very costly cumbersome and not representative of the risk population. Conversely, cross-sectional approaches could be representative but rely on the retrospective information to estimate prevalence and incidence. We present an Agent-based Modeling (ABM) approach where we use behavioral data from a cross-sectional representative study and project the behavior into the future so that the risks of acquiring HIV could be studied in a dynamical/temporal sense. We show how the blend of behavior and contact network factors (sexual, injecting) play the role in the risk of future HIV acquisition and time till obtaining HIV. We show which subjects are the most likely persons to get HIV in the next year, and whom they are likely to infect. We examine how different behaviors are related to the increase or decrease of HIV risks and how to estimate the quantifiable risk measures such as survival HIV free.

  1. Designing an integrated model based on the indicators Quality and Earned Value for risk management in Information Technology Projects

    OpenAIRE

    TATLARI, Mohammad Reza; KAZEMİPOOR, Hamed

    2015-01-01

    There are two effective factors on Information Technology (IT) projects risk including quality and earned value so that by controlling these two factors and their increased level in IT projects, the corresponding risk can be decreased. Therefore in present study, an integrated model was designed based on quality and earned value indicators for risk management in IT projects on a new and efficient approach. The proposed algorithm included the steps such as preparing a list of several indicator...

  2. Modelling projections for the risks related with atrial fibrillation in East Asia

    DEFF Research Database (Denmark)

    Bai, Ying; Guo, Shi-Dong; Shantsila, Alena

    2017-01-01

    Aims: In the Far East, there has generally been low uptake of oral anticoagulants (OACs) using vitamin K antagonists (VKA, e.g. warfarin) for stroke prevention in atrial fibrillation (AF), but OAC use has been increasing more recently, with the introduction of the non-vitamin K antagonist oral...... anticoagulants (NOACs). To explore the risks of ischaemic stroke (IS) and death related to AF in East Asia using modelling projections. Methods and results: We performed a modelling analysis of possible trends of IS and death rates in AF patients from the time period of only VKA use to current increasing trends....... There was an estimated annual risk reduction of 5484 ISs and 1128 deaths from 2016 to 2030, respectively. The AF population is estimated to reach 861 900 in 2050, with a reduction of 206 315 ISs and 139 353 deaths. Conclusion: This modelling analysis suggests that the transition from VKA to NOACs may greatly help...

  3. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Klos, Richard; Wilmot, Roger [Galson Sciences Ltd (United Kingdom)

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference

  4. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    International Nuclear Information System (INIS)

    Klos, Richard; Wilmot, Roger

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference between

  5. Risks to coral reefs from ocean carbonate chemistry changes in recent earth system model projections

    International Nuclear Information System (INIS)

    Ricke, K L; Caldeira, K; Orr, J C; Schneider, K

    2013-01-01

    Coral reefs are among the most biodiverse ecosystems in the world. Today they are threatened by numerous stressors, including warming ocean waters and coastal pollution. Here we focus on the implications of ocean acidification for the open ocean chemistry surrounding coral reefs, as estimated from earth system models participating in the Coupled Model Intercomparison Project, Phase 5 (CMIP5). We project risks to reefs in the context of three potential aragonite saturation (Ωa) thresholds. We find that in preindustrial times, 99.9% of reefs adjacent to open ocean in the CMIP5 ensemble were located in regions with Ωa > 3.5. Under a business-as-usual scenario (RCP 8.5), every coral reef considered will be surrounded by water with Ωa 2 emissions abatement, the Ωa threshold for reefs is critical to projecting their fate. Our results indicate that to maintain a majority of reefs surrounded by waters with Ωa > 3.5 to the end of the century, very aggressive reductions in emissions are required. The spread of Ωa projections across models in the CMIP5 ensemble is narrow, justifying a high level of confidence in these results. (letter)

  6. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  7. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  8. Feasibility Risk Assessment of Transport Infrastructure Projects: The CBA-DK Decision Support Model

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Banister, David

    2010-01-01

    informed decision support towards decision-makers and stakeholders in terms of accumulated descending graphs. The decision support method developed in this paper aims to provide assistance in the analysis and ultimately the choice of action, while accounting for the uncertainties surrounding any transport......This paper presents the final version of the CBA-DK decision support model for assessment of transport projects. The model makes use of conventional cost-benefit analysis resulting in aggregated single point estimates and quantitative risk analysis using Monte Carlo simulation resulting in interval...... result, and the determination of suitable probability distributions. Use is made of the reference class forecasting information, such as that developed in Optimism Bias for adjustments to investment decisions that relate to all modes of transport. The CBA-DK decision support model results in more...

  9. Multistage models of carcinogenesis and their implications for dose-response models and risk projections

    International Nuclear Information System (INIS)

    Hoel, D.G.

    1992-01-01

    Multistage models are used to both describe the biological steps in developing a cancer and as a mathematical description of the relationship of exposure to tumor incidence. With the rapid development of molecular biology the stages of tumor development are becoming understood. Specifically, the effect and role of proto-oncogenes and suppressor genes are exciting developments in the field of carcinogenesis. Mathematically the field has moved from the original Armitage-Doll multistage model to the more current cell kinetic models. These latter models attempt to describe both the rate of cell mutation and the birth-death process involved in clonal expansion. This then allows modeling of both initiation and promotion or cellular proliferation. The field of radiation carcinogenesis has a considerable body of data and knowledge. Unfortunately, relatively little work has been done with the cell kinetic models as to estimation of tumor incidence. This may be due to the newness of kinetic models in general. The field holds promise and it is essential if we are to develop better human risk estimates from exposure to ionizing radiation. (author)

  10. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume I. Introduction to the SPAHR demographic model for health risk

    International Nuclear Information System (INIS)

    Collins, J.J.; Lundy, R.T.; Grahn, D.; Ginevan, M.E.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. The first volume presents the theory behind the SPAHR health risk projection model and several applications of the model to actual pollution episodes. The elements required for an effective health risk projection model are specified, and the models that have been used to date in health risk projections are outlined. These are compared with the demographic model, whose formulation is described in detail. Examples of the application of air pollution and radiation dose-response functions are included in order to demonstrate the estimation of future mortality and morbidity levels and the range of variation in excess deaths that occurs when populations structure is changed

  11. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume I. Introduction to the SPAHR demographic model for health risk

    Energy Technology Data Exchange (ETDEWEB)

    Collins, J.J.; Lundy, R.T.; Grahn, D.; Ginevan, M.E.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. The first volume presents the theory behind the SPAHR health risk projection model and several applications of the model to actual pollution episodes. The elements required for an effective health risk projection model are specified, and the models that have been used to date in health risk projections are outlined. These are compared with the demographic model, whose formulation is described in detail. Examples of the application of air pollution and radiation dose-response functions are included in order to demonstrate the estimation of future mortality and morbidity levels and the range of variation in excess deaths that occurs when populations structure is changed.

  12. Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model

    Directory of Open Access Journals (Sweden)

    Ming Li

    2017-09-01

    Full Text Available Prefabricated construction, a new direction for the future development of the Chinese construction industry, can maximize the requirements of “green”. As a new form of green building, prefabricated construction is of particular interest. On account of the immature development of the green building market in China, the investment risk for prefabricated construction is higher than for traditional architecture. Hence, it is especially important to improve its investment risk identification and management. This study adopts system dynamics and builds a risk identification feedback chart and risk flow chart, to comprehensively identify investment risks that projects in China may face and to process quantitative estimation of investment risk factors. Key factors influencing project investment risks are found, and corresponding measures are pointedly proposed. This paper may provide guidance and a reference for promoting the sound development of prefabricated construction in China.

  13. 76 FR 31329 - EPA Radiogenic Cancer Risk Models and Projections for the U.S. Population (Blue Book)

    Science.gov (United States)

    2011-05-31

    ... Models and Projections for the U.S. Population (Blue Book) AGENCY: Environmental Protection Agency (EPA...-11-001, April 2011), also known as the Blue Book, which provides radiation risk assessment methodology. EPA will use the scientific information on radiation risks provided in the Blue Book, together...

  14. Modelling of risk events with uncertain likelihoods and impacts in large infrastructure projects

    DEFF Research Database (Denmark)

    Schjær-Jacobsen, Hans

    2010-01-01

    to prevent future budget overruns. One of the central ideas is to introduce improved risk management processes and the present paper addresses this particular issue. A relevant cost function in terms of unit prices and quantities is developed and an event impact matrix with uncertain impacts from independent......This paper presents contributions to the mathematical core of risk and uncertainty management in compliance with the principles of New Budgeting laid out in 2008 by the Danish Ministry of Transport to be used in large infrastructure projects. Basically, the new principles are proposed in order...... uncertain risk events is used to calculate the total uncertain risk budget. Cost impacts from the individual risk events on the individual project activities are kept precisely track of in order to comply with the requirements of New Budgeting. Additionally, uncertain likelihoods for the occurrence of risk...

  15. NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs

    Institute of Scientific and Technical Information of China (English)

    Franco-Sepulveda Giovanni; Campuzano Carlos; Pineda Cindy

    2017-01-01

    This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

  16. Risk management of the North Anna Power Station Service Water System Preservation Project using the IPE model

    International Nuclear Information System (INIS)

    Afzali, A.; Donovan, M.D.; Sartain, M.D.; Bankley, A.V.

    1993-01-01

    This paper discusses the application of the North Anna Power Station Individual Plant Examination (IPE) models in PRA study of the Service Water System Preservation Project (SWSPP). The service water project involves repair and restoration of the Service Water System (SWS) piping and will require excavation of the buried SWS lines in addition to temporarily removing one of the two redundant SWS loops from operation. The SWSPP will be carried out with one or both units in normal operation. The objective of the PRA study was to quantify the risk impact (as measured by the change in Core Damage Frequency (ΔCDF)) of the SWSPP and to identify and evaluate countermeasures to reduce the risk impact of the project activities. The study concluded that the ΔCDF would be acceptable by undertaking preventative measures and by providing additional accident mitigating measures during performance of the SWSPP activities

  17. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  18. Potential Bias in Projecting Future Regional Megadrought Risk: Insights From A Global Data-Model Framework

    Science.gov (United States)

    Overpeck, J. T.; Ault, T.; Cole, J. E.; Fasullo, J.; Loope, G. R.; Parsons, L. A.; Stevenson, S.

    2015-12-01

    Megadrought is one of the most significant and costly climate extremes, and one that stakeholders (e.g., water and other resource managers) the world over wish to understand better; in particular, they need estimates of the risk of severe droughts as a function of drought frequency, severity, duration, and atmospheric greenhouse gas concentration. In many dry-climate regions of the globe, megadrought is synonymous with multi-decadal drought. However, in other regions, megadrought can be defined as extended drought, mostly not seen in the period of instrumental observations, and that would have large impacts if it were to occur in the future. New and published paleoclimatic observations allow us to understand the spectrum of drought in many regions of the globe; droughts exceeding 50 years have occurred in recent Earth history in southwestern North America, sub-Saharan Africa, the Mediterranean and Australia, whereas shorter megadroughts have occurred in Monsoon Asia, Amazonia and elsewhere. Data-model comparisons for regions with sufficiently long (e.g., 1000-2000 years) records of observed hydroclimatic variability suggest that state-of-the-art models can provide realistic estimates of interannual to decadal drought risk, but underestimate the risk of megadrought. Likely reasons for this shortcoming are the lack of sufficient multi-decadal variability in simulations of the past and future, plus an underappreciated understanding about how temperature variability and land-surface feedbacks interact with hydrological and ecological drought, as well as the roles played by unusually wet hydroclimatic extremes (e.g., ENSO related) in ending droughts of long duration. Paleoclimatic records also provide the opportunity to estimate how much models underestimate megadrought risk as a function of locale, frequency, severity, duration, and atmospheric greenhouse gas concentration; they also aid in providing stakeholders with bias-corrected estimates of megadrought risk.

  19. Risks of ocean acidification in the California Current food web and fisheries: ecosystem model projections.

    Science.gov (United States)

    Marshall, Kristin N; Kaplan, Isaac C; Hodgson, Emma E; Hermann, Albert; Busch, D Shallin; McElhany, Paul; Essington, Timothy E; Harvey, Chris J; Fulton, Elizabeth A

    2017-04-01

    The benefits and ecosystem services that humans derive from the oceans are threatened by numerous global change stressors, one of which is ocean acidification. Here, we describe the effects of ocean acidification on an upwelling system that already experiences inherently low pH conditions, the California Current. We used an end-to-end ecosystem model (Atlantis), forced by downscaled global climate models and informed by a meta-analysis of the pH sensitivities of local taxa, to investigate the direct and indirect effects of future pH on biomass and fisheries revenues. Our model projects a 0.2-unit drop in pH during the summer upwelling season from 2013 to 2063, which results in wide-ranging magnitudes of effects across guilds and functional groups. The most dramatic direct effects of future pH may be expected on epibenthic invertebrates (crabs, shrimps, benthic grazers, benthic detritivores, bivalves), and strong indirect effects expected on some demersal fish, sharks, and epibenthic invertebrates (Dungeness crab) because they consume species known to be sensitive to changing pH. The model's pelagic community, including marine mammals and seabirds, was much less influenced by future pH. Some functional groups were less affected to changing pH in the model than might be expected from experimental studies in the empirical literature due to high population productivity (e.g., copepods, pteropods). Model results suggest strong effects of reduced pH on nearshore state-managed invertebrate fisheries, but modest effects on the groundfish fishery because individual groundfish species exhibited diverse responses to changing pH. Our results provide a set of projections that generally support and build upon previous findings and set the stage for hypotheses to guide future modeling and experimental analysis on the effects of OA on marine ecosystems and fisheries. © 2017 John Wiley & Sons Ltd.

  20. Default risk in project finance

    NARCIS (Netherlands)

    Klompjan, R.; Wouters, Marc

    2002-01-01

    Understanding default risk in project finance is relevant to investors. This article investigates which factors are most strongly associated with the occurrence of project finance default, using data from 210 projects, of which 37 were in default. The authors found that the use of proven technology,

  1. Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks

    Directory of Open Access Journals (Sweden)

    Foroogh Ghasemi

    2018-05-01

    Full Text Available An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and the achievement of those objectives. Moreover, project interdependencies and cause–effect relationships between risks create complexity for portfolio risk analysis. This paper presents a model using Bayesian network (BN methodology for modeling and analyzing portfolio risks. To develop this model, first, portfolio-level risks and risks caused by project interdependencies are identified. Then, based on their cause–effect relationships all portfolio risks are organized in a BN. Conditional probability distributions for this network are specified and the Bayesian networks method is used to estimate the probability of portfolio risk. This model was applied to a portfolio of a construction company located in Iran and proved effective in analyzing portfolio risk probability. Furthermore, the model provided valuable information for selecting a portfolio’s projects and making strategic decisions.

  2. A new market risk model for cogeneration project financing---combined heat and power development without a power purchase agreement

    Science.gov (United States)

    Lockwood, Timothy A.

    Federal legislative changes in 2006 no longer entitle cogeneration project financings by law to receive the benefit of a power purchase agreement underwritten by an investment-grade investor-owned utility. Consequently, this research explored the need for a new market-risk model for future cogeneration and combined heat and power (CHP) project financing. CHP project investment represents a potentially enormous energy efficiency benefit through its application by reducing fossil fuel use up to 55% when compared to traditional energy generation, and concurrently eliminates constituent air emissions up to 50%, including global warming gases. As a supplemental approach to a comprehensive technical analysis, a quantitative multivariate modeling was also used to test the statistical validity and reliability of host facility energy demand and CHP supply ratios in predicting the economic performance of CHP project financing. The resulting analytical models, although not statistically reliable at this time, suggest a radically simplified CHP design method for future profitable CHP investments using four easily attainable energy ratios. This design method shows that financially successful CHP adoption occurs when the average system heat-to-power-ratio supply is less than or equal to the average host-convertible-energy-ratio, and when the average nominally-rated capacity is less than average host facility-load-factor demands. New CHP investments can play a role in solving the world-wide problem of accommodating growing energy demand while preserving our precious and irreplaceable air quality for future generations.

  3. URBAN SPRAWL MODELING, AIR QUALITY MONITORING AND RISK COMMUNICATION: THE NORTHEAST OHIO PROJECT

    Science.gov (United States)

    The Northeast Ohio Urban Sprawl, Air Quality Monitoring, and Communications Project (hereafter called the Northeast Ohio Project) provides local environmental and health information useful to residents, local officials, community planners, and others in a 15 county region in the ...

  4. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  5. Model project for the pollution investigation of a lake. The use of nuclear techniques for environmental risk assessment

    International Nuclear Information System (INIS)

    Goektepe, B. G.; Borak, F.; Fowler, S.; Yilmaz Erkol, A.

    2002-01-01

    Environmental pollution monitoring and the protection of water resources are vital in terms of public health and economical consequences for many of the countries. The use of nuclear and isotopic techniques for pollution investigation of water resources on the other hand has been gaining more importance during the recent years. In recognition of the serious pollution problems of the surface water resources; a large scope multidisciplinary environmental management project with short title 'Lake Project' which is designed and developed by the group of scientists at the Cekmece Nuclear Research and Training Center of the Turkish Atomic Energy Authority is presented. This multidisciplinary project has various important aspects; scientific, social, economic, educational, cultural and political. Specific problem a dressed was the serious pollution of Kucukcekmece Lake due to high population and industrial growth in the region as well as creation of public awareness on the peaceful activities of the Cekmece Nuclear Research Center. The main objective was to promote the use of nuclear and isotopic techniques in the assessment of local, national and regional environmental pollution control and management. The project implementation was carried out in two phases and supported by the International Atomic Energy Agency. Water, biota and sediment samples were collected from several sampling stations seasonally. Some of the results are presented in tables for natural radioactivity, chemical and physical parameters. The first phases of the project has provided tools and methods for identifying types and magnitudes of contaminants in the Kucukcekmece Lake. Results obtained from the model project show that the radioactivity pollution levels have no significance in terms of human health and ecosystem. However, major problem regarding lake and marine environmental management is identified as eutrophication. This is a process of water quality degradation caused by mainly by domestic

  6. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  7. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  8. Blue Book: EPA Radiogenic Cancer Risk Models and Projections for the U.S. Population

    Science.gov (United States)

    This document presents EPA estimates of cancer incidence and mortality risk coefficients pertaining to low dose exposures to ionizing radiation for the U.S. population, as well as their scientific basis.

  9. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  10. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  11. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  12. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  13. Risk of Cyberterrorism to Naval Ships Inport Naval Station Everett: A Model Based Project Utilizing SIAM

    National Research Council Canada - National Science Library

    Tester, Rodrick A

    2007-01-01

    .... In doing so, an influence net model was designed to discover the likelihood of a successful cyber attack However, first it was necessary to establish what the best mitigation tools are in defense...

  14. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  15. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  16. Applying a machine learning model using a locally preserving projection based feature regeneration algorithm to predict breast cancer risk

    Science.gov (United States)

    Heidari, Morteza; Zargari Khuzani, Abolfazl; Danala, Gopichandh; Mirniaharikandehei, Seyedehnafiseh; Qian, Wei; Zheng, Bin

    2018-03-01

    Both conventional and deep machine learning has been used to develop decision-support tools applied in medical imaging informatics. In order to take advantages of both conventional and deep learning approach, this study aims to investigate feasibility of applying a locally preserving projection (LPP) based feature regeneration algorithm to build a new machine learning classifier model to predict short-term breast cancer risk. First, a computer-aided image processing scheme was used to segment and quantify breast fibro-glandular tissue volume. Next, initially computed 44 image features related to the bilateral mammographic tissue density asymmetry were extracted. Then, an LLP-based feature combination method was applied to regenerate a new operational feature vector using a maximal variance approach. Last, a k-nearest neighborhood (KNN) algorithm based machine learning classifier using the LPP-generated new feature vectors was developed to predict breast cancer risk. A testing dataset involving negative mammograms acquired from 500 women was used. Among them, 250 were positive and 250 remained negative in the next subsequent mammography screening. Applying to this dataset, LLP-generated feature vector reduced the number of features from 44 to 4. Using a leave-onecase-out validation method, area under ROC curve produced by the KNN classifier significantly increased from 0.62 to 0.68 (p breast cancer detected in the next subsequent mammography screening.

  17. The ChimERA project: Coupling mechanistic exposure and effect models into an integrated platform for ecological risk assessment

    NARCIS (Netherlands)

    Laender, de F.; Brink, van den P.J.; Janssen, C.R.; Guardo, Di A.

    2014-01-01

    Current techniques for the ecological risk assessment of chemical substances are often criticised for their lack of environmental realism, ecological relevance and methodological accuracy. ChimERA is a 3-year project (2013-2016), funded by Cefic's Long Range Initiative (LRI) that aims to address

  18. Risk-informed ranking of engineering projects

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2011-01-01

    Refurbishment planning requires prudent investment decisions with respect to the various systems and components at the station. These decisions are influenced by many factors, including engineering, safety, regulatory, economic, and political constraints. From an engineering perspective, the concept of cost-benefit analysis is a common way to allocate capital among various projects. Naturally, the 'best' or optimal project should have the lowest cost and the highest benefit. In the context of risk-informed decision making (RIDM), a process that has been widely embraced by the global nuclear community, the costs and benefits must further be 'weighted' by probabilities to estimate the underlying risk associated with the various planning alternatives. The main purpose of this study is to illustrate how risk and reliability information can be integrated into the refurbishment planning process to facilitate more objective and transparent investment decisions. The methodology is based on the concept of generation risk assessment (GRA) which provides a systematic approach for balancing investment costs with the reduction in overall financial risk. In addition to reliability predictions, the model provides estimates for the level of risk reduction associated with each system/project and also the break-even point for investment. This information is vital for project ranking, and helps to address the key question of whether capital investment should be made in the most risk critical systems, or in systems that reduce the overall risk the most. The application of the proposed methodology requires only basic information regarding the current reliability of each engineering system, which should be readily available from plant records and routine condition assessments. Because the methodology can be readily implemented in a Microsoft Excel spreadsheet, all plausible (e.g., bounding) planning scenarios, with or without investment, can also be generated quickly and easily, while

  19. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  20. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  1. Streamlining project delivery through risk analysis.

    Science.gov (United States)

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  2. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  3. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  4. Renewable fuels: Policy effectiveness and project risk

    International Nuclear Information System (INIS)

    Leach, Andrew; Doucet, Joseph; Nickel, Trevor

    2011-01-01

    This paper examines the impact of government policy on the risk profile of a small ethanol production facility. We derive four key results from a simulation model. First, we show that commodity price risk may discourage investment in a project, despite a positive expected rate of return. Second, we show that political uncertainty may have significant impacts on the risk profile of a project. Next, we show that using only production subsidies to attract investors is expensive, since the financial assistance is paid regardless of whether the plant is operating under positive or negative financial conditions. Finally, we show that a capital grant provides a valuable complement to a subsidy, because the grant reduces the amount of value investors must put at risk, and increases their leverage thereby enhancing returns, while the subsidy mitigates commodity price risk. Our results show that compared to a subsidy-only approach, a grant and subsidy combination provides an investment environment with similar downside protection and expected returns for less than 60% of the cost. Further, we show that the two policy tools combined yield a superior investment environment to that created by an equivalent or greater total investment deployed entirely in either of the policy tools without the other. - Research highlights: → We find that government policy may increase both project returns and risk. → We find a policy of capital grants combined with an output price support to be preferred. → Price supports alone will tend to reward those plants which need them the least.

  5. Risk assessment and management in IOR projects

    International Nuclear Information System (INIS)

    Goodyear, S.G.; Gregory, A.T.

    1994-01-01

    The application of IOR techniques is one of the investment opportunities open to Exploration and Production companies. A project will only go forward if the perceived balance between the rewards and the risks is acceptable. IOR projects may be ruled out because they are considered to involve significantly higher risks than conventional developments. Therefore, some means of evaluating the actual level of risk may be required if the full economic benefits from IOR techniques are to be realized. Risk assessment is a key element in safety cases, where a well-established methodology for quantifying risk exists. This paper discusses the extension of these methods to IOR project risk assessment. Combining reservoir and IOR technique uncertainties with their impact on project performance allows project risk to be better quantified. The results of the risk assessment are presented in terms of a risk-reward diagram that plots the probability surface for possible project outcomes as a function of NPV (reward) and exposure (risk)

  6. General risks for tunnelling projects: An overview

    Science.gov (United States)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  7. An Assessment of risk response strategies practiced in software projects

    Directory of Open Access Journals (Sweden)

    Vanita Bhoola

    2014-11-01

    Full Text Available Risk management and success in projects are highly intertwined – better approaches to project risk management tend to increase chances of project success in terms of achieving scope & quality, schedule and cost targets. The process of responding to risk factors during a project’s life cycle is a crucial aspect of risk management referred to as risk response strategies, in this paper. The current research explores the status of risk response strategies applied in the software development projects in India. India provides a young IT-savvy English-speaking population, which is also cost effective. Other than the workforce, the environment for implementation of software projects in India is different from the matured economies. Risk management process is a commonly discussed theme, though its implementation in practice has a huge scope for improvement in India. The paper talks about four fundamental treatments to risk response – Avoidance, Transference, Mitigation and Acceptance (ATMA. From a primary data of 302 project managers, the paper attempts to address the risk response factors that lead to successful achievement of project scope & quality, schedule and cost targets, by using a series of regressions followed with Seemingly Unrelated Regression Equations (SURE modelling. Mitigation emerged as the most significant risk response strategy to achieve project targets. Acceptance, transference, and avoidance of risk were mostly manifested in the forms of transparency in communication across stakeholders, careful study of the nature of risks and close coordination between project team, customers/end-users and top management.

  8. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  9. INDICATIVE MODEL OF DEVIATIONS IN PROJECT

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2016-02-01

    Full Text Available The article shows the process of constructing the project deviations indicator model. It based on a conceptual model of project deviations integrated management (PDIM. During the project different causes (such as risks, changes, problems, crises, conflicts, stress lead to deviations of integrated project indicators - time, cost, quality, and content. For a more detailed definition of where in the project deviations occur and how they are dangerous for the whole project, it needs to develop an indicative model of project deviations. It allows identifying the most dangerous deviations that require PDIM. As a basis for evaluation of project's success has been taken famous model IPMA Delta. During the evaluation, IPMA Delta estimated project management competence of organization in three modules: I-Module ("Individuals" - a self-assessment personnel, P-module ("Projects" - self-assessment of projects and/or programs, and O-module ("Organization" - used to conduct interviews with selected people during auditing company. In the process of building an indicative model of deviations in the project, the first step is the assessment of project management in the organization by IPMA Delta. In the future, built cognitive map and matrix of system interconnections of the project, which conducted simulations and built a scale of deviations for the selected project. They determined a size and place of deviations. To identify the detailed causes of deviations in the project management has been proposed to use the extended system of indicators, which is based on indicators of project management model Project Excellence. The proposed indicative model of deviations in projects allows to estimate the size of variation and more accurately identify the place of negative deviations in the project and provides the project manager information for operational decision making for the management of deviations in the implementation of the project

  10. Sound transit climate risk reduction project.

    Science.gov (United States)

    2013-09-01

    The Climate Risk Reduction Project assessed how climate change may affect Sound Transit commuter rail, light rail, and express bus : services. The project identified potential climate change impacts on agency operations, assets, and long-term plannin...

  11. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  12. Understanding Pre-Quantitative Risk in Projects

    Science.gov (United States)

    Cooper, Lynne P.

    2011-01-01

    Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

  13. Myanmar Model Project

    International Nuclear Information System (INIS)

    Le Heron, John

    1998-01-01

    The National Radiation Laboratory was approached by the IAEA in 1997 to provide assistance to the government of Myanmar, as part of the Model Project, in setting up an appropriate regulatory framework for radiation protection. To this end John Le Heron spent 3 weeks in late 1997 based at the Atomic Energy Department of the Ministry of Science and Technology, Yangon, assessing the existing legal framework, assisting with the review and design of the legal framework for consistency with the Basic Safety Standards, and assisting in the preparation of a system of notification, authorisation and inspection of radiation practices. (author)

  14. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  15. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, Johannes I.M.; Keizer, J.A.

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  16. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1994-01-01

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  17. Modelling of Transport Projects Uncertainties

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2009-01-01

    This paper proposes a new way of handling the uncertainties present in transport decision making based on infrastructure appraisals. The paper suggests to combine the principle of Optimism Bias, which depicts the historical tendency of overestimating transport related benefits and underestimating...... to supplement Optimism Bias and the associated Reference Class Forecasting (RCF) technique with a new technique that makes use of a scenario-grid. We tentatively introduce and refer to this as Reference Scenario Forecasting (RSF). The final RSF output from the CBA-DK model consists of a set of scenario......-based graphs which function as risk-related decision support for the appraised transport infrastructure project....

  18. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  19. Security Risk Assessment in Software Development Projects

    OpenAIRE

    Svendsen, Heidi

    2017-01-01

    Software security is increasing in importance, linearly with vulnerabilities caused by software flaws. It is not possible to spend all the project s resources on software security. To spend the resources given to security in an effective way, one should know what is most important to protect. By performing a risk analysis the project know which vulnerabilities they face. A risk analysis will prioritise the vulnerabilities, and when the vulnerabilities are prioritised the project know where th...

  20. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  1. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  2. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  3. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  4. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  5. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  6. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  7. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  8. Multiobjective genetic algorithm approaches to project scheduling under risk

    OpenAIRE

    Kılıç, Murat; Kilic, Murat

    2003-01-01

    In this thesis, project scheduling under risk is chosen as the topic of research. Project scheduling under risk is defined as a biobjective decision problem and is formulated as a 0-1 integer mathematical programming model. In this biobjective formulation, one of the objectives is taken as the expected makespan minimization and the other is taken as the expected cost minimization. As the solution approach to this biobjective formulation genetic algorithm (GA) is chosen. After carefully invest...

  9. On Modeling Risk Shocks

    OpenAIRE

    Dorofeenko, Victor; Lee, Gabriel; Salyer, Kevin; Strobel, Johannes

    2016-01-01

    Within the context of a financial accelerator model, we model time-varying uncertainty (i.e. risk shocks) through the use of a mixture Normal model with time variation in the weights applied to the underlying distributions characterizing entrepreneur productivity. Specifically, we model capital producers (i.e. the entrepreneurs) as either low-risk (relatively small second moment for productivity) and high-risk (relatively large second moment for productivity) and the fraction of both types is...

  10. safety risk management based on fuzzy logic at underground projects

    Directory of Open Access Journals (Sweden)

    Farhad Taherkhani

    2017-11-01

    Conclusion: In the present article, a new model was developed to calculate the probability of occurrence of the event, which so far has not been addressed in other studies. Finally, effective measures can be taken to reduce the risk of a project by eliminating the high risk factors.

  11. Naesliden project: FEM modelling strategies

    Energy Technology Data Exchange (ETDEWEB)

    Borg, T.

    1980-05-15

    A schematized description is given of the different stages in the project. The aim is to show the development of the project and the strategies which have been chosen. The four different stages in the project are treated from the following points of view: the reasons for the choice of material models; the determination of model properties; and the control of the calculated values. In the origin plan for the project it was stated to only use a joint element model. However, it was shown to be a reasonable strategy to use both a general linear elastic model and a geometric restricted model with joint elements. During the course of the Project's development stages, it was found that a reduction in the number of rock types could be made without loss of generality. A modified strategy is suggested based on more studies of the rock bahavior and less advanced calculations in the first stages of the project.

  12. Construction Project Administration and Management for Mitigating Work Zone Accidents and Fatalities: An Integrated Risk Management Model

    Science.gov (United States)

    2009-10-01

    The goal of this research is to mitigate the risk of highway accidents (crashes) and fatalities in work zones. The approach of this research has been to address the mitigation of work zone crashes through the creation of a formal risk management mode...

  13. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  14. Modelling of Transport Projects Uncertainties

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2012-01-01

    This paper proposes a new way of handling the uncertainties present in transport decision making based on infrastructure appraisals. The paper suggests to combine the principle of Optimism Bias, which depicts the historical tendency of overestimating transport related benefits and underestimating...... to supplement Optimism Bias and the associated Reference Class Forecasting (RCF) technique with a new technique that makes use of a scenario-grid. We tentatively introduce and refer to this as Reference Scenario Forecasting (RSF). The final RSF output from the CBA-DK model consists of a set of scenario......-based graphs which functions as risk-related decision support for the appraised transport infrastructure project. The presentation of RSF is demonstrated by using an appraisal case concerning a new airfield in the capital of Greenland, Nuuk....

  15. Clean development mechanism projects and portfolio risks

    International Nuclear Information System (INIS)

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  16. NASA Space Radiation Risk Project: Overview and Recent Results

    Science.gov (United States)

    Blattnig, Steve R.; Chappell, Lori J.; George, Kerry A.; Hada, Megumi; Hu, Shaowen; Kidane, Yared H.; Kim, Myung-Hee Y.; Kovyrshina, Tatiana; Norman, Ryan B.; Nounu, Hatem N.; hide

    2015-01-01

    The NASA Space Radiation Risk project is responsible for integrating new experimental and computational results into models to predict risk of cancer and acute radiation syndrome (ARS) for use in mission planning and systems design, as well as current space operations. The project has several parallel efforts focused on proving NASA's radiation risk projection capability in both the near and long term. This presentation will give an overview, with select results from these efforts including the following topics: verification, validation, and streamlining the transition of models to use in decision making; relative biological effectiveness and dose rate effect estimation using a combination of stochastic track structure simulations, DNA damage model calculations and experimental data; ARS model improvements; pathway analysis from gene expression data sets; solar particle event probabilistic exposure calculation including correlated uncertainties for use in design optimization.

  17. Consideration of Risk in PPP-Projects

    Directory of Open Access Journals (Sweden)

    Josef Zimmermann

    2014-06-01

    Full Text Available Risk management has become a core competence for companies operating in construction services. In particular regarding Real Estate Development and Construction Management the fundamental knowledge and the dedicated ap- plication of risk assessment turn out to be critical. Construction Management deals with a multitude of local and temporal issues which are unknown or only given by statistical evaluation while conducting a unique construction project within a very tight frame of budget and time. Real Estate projects focus on the predictability of profitable operation for a fairly long period in advance and are therefore subject to many more and more voluminous uncertainties. With PPP-projects a more or less complete federal task is awarded to a private company. Its extent varies but com- prises at least design, construction and operation of a real estate project, e.g. a toll road, bridge, tunnel or other infrastructural object. Durations of such contracts of- ten extend to some 20 to 30 years. In this article the applicability of traditional means of risk management is inves- tigated for the use on PPP-projects and limits of risk consequences are pointed out. Finally we come to the conclusion, that the resulting unavertable risks tend to exceed every surcharge that could be successfully placed on a market.

  18. Use of risk projection models to estimate mortality and incidence from radiation-induced breast cancer in screening programs

    International Nuclear Information System (INIS)

    Ramos, M; Ferrer, S; Villaescusa, J I; Verdu, G; Salas, M D; Cuevas, M D

    2005-01-01

    The authors report on a method to calculate radiological risks, applicable to breast screening programs and other controlled medical exposures to ionizing radiation. In particular, it has been applied to make a risk assessment in the Valencian Breast Cancer Early Detection Program (VBCEDP) in Spain. This method is based on a parametric approach, through Markov processes, of hazard functions for radio-induced breast cancer incidence and mortality, with mean glandular breast dose, attained age and age-at-exposure as covariates. Excess relative risk functions of breast cancer mortality have been obtained from two different case-control studies exposed to ionizing radiation, with different follow-up time: the Canadian Fluoroscopy Cohort Study (1950-1987) and the Life Span Study (1950-1985 and 1950-1990), whereas relative risk functions for incidence have been obtained from the Life Span Study (1958-1993), the Massachusetts tuberculosis cohorts (1926-1985 and 1970-1985), the New York post-partum mastitis patients (1930-1981) and the Swedish benign breast disease cohort (1958-1987). Relative risks from these cohorts have been transported to the target population undergoing screening in the Valencian Community, a region in Spain with about four and a half million inhabitants. The SCREENRISK software has been developed to estimate radiological detriments in breast screening. Some hypotheses corresponding to different screening conditions have been considered in order to estimate the total risk associated with a woman who takes part in all screening rounds. In the case of the VBCEDP, the total radio-induced risk probability for fatal breast cancer is in a range between [5 x 10 -6 , 6 x 10 -4 ] versus the natural rate of dying from breast cancer in the Valencian Community which is 9.2 x 10 -3 . The results show that these indicators could be included in quality control tests and could be adequate for making comparisons between several screening programs

  19. Risk analysis for renewable energy projects due to constraints arising

    Science.gov (United States)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  20. Method ranks competing projects by priorities, risk

    International Nuclear Information System (INIS)

    Moeckel, D.R.

    1993-01-01

    A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerning various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time

  1. Risk-profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as an insurance vehicle and can be used at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. Either futures of swaps can be used to guarantee or modify product prices. While this does not necessarily maximize cash flow or present worth, it can protect a project or company for several years from downside price risk, thereby reducing the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cash flows or net incomes. This paper reports that reducing risk by limiting downside price exposure could alter budgeting decisions, allow continued or expanded operations of a particular property, or increase debt capacity

  2. Financial risks in major investment projects

    International Nuclear Information System (INIS)

    Segelod, Esbjoern

    2006-01-01

    We have probably all read about large projects which proved far more expensive than anticipated, projects such as the Channel tunnel which cost 80% more than planned, and the oil pipeline between the oil field in Prudhoe Bay in Northern Alaska and the oil terminal in Vadez in the south which overran its budget by 1,000%. The purpose of this paper is to summarise our knowledge of the risk of cost escalation. Which projects are more likely than others to be hit by cost escalation, and why

  3. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  4. Research into specific risk assessment in project financing

    Directory of Open Access Journals (Sweden)

    Ivana Bestvina Bukvić

    2013-12-01

    Full Text Available An assessment of investment justification in terms of risk enables the decision maker (investor to select, among available alternatives, the one with the most favourable correlation between the expected profit and assumed risk. At the micro level, the uncertainty of business success is extremely high in production activities, which is an additional incentive for taking a comprehensive approach to the issue of investment decision-making and the development of risk assessment techniques applicable in this particular segment of industry. Given the complexity of the manufacturing process, the length of the production cycle, market conditions, and entity-specific risks (which are difficult to measure, projects in manufacturing industry require a detailed and comprehensive assessment of specific risk factors and their cost-effectiveness. Ne - vertheless, since specific risks can be diversified, investment proposal assessments in practice usually do not cover their quantification and analysis. However, the majority of business entities do not have enough active projects in various industries to be able to fully diversify their business and thus minimize the level of specific risks. The impact of specific factors becomes one of the most important elements for business success. This paper analyses how far risk assessment methods regarding specific risks are used in practice. Furthermore, it analyses the significance of specific risks for total investment risk. This study gives new insi - ghts into the significance of specific risks to the overall investment assessment and the need for permanent development of traditionally used investment assessment models.

  5. Melanoma Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing melanoma cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  6. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  7. Prototype Biology-Based Radiation Risk Module Project

    Science.gov (United States)

    Terrier, Douglas; Clayton, Ronald G.; Patel, Zarana; Hu, Shaowen; Huff, Janice

    2015-01-01

    Biological effects of space radiation and risk mitigation are strategic knowledge gaps for the Evolvable Mars Campaign. The current epidemiology-based NASA Space Cancer Risk (NSCR) model contains large uncertainties (HAT #6.5a) due to lack of information on the radiobiology of galactic cosmic rays (GCR) and lack of human data. The use of experimental models that most accurately replicate the response of human tissues is critical for precision in risk projections. Our proposed study will compare DNA damage, histological, and cell kinetic parameters after irradiation in normal 2D human cells versus 3D tissue models, and it will use a multi-scale computational model (CHASTE) to investigate various biological processes that may contribute to carcinogenesis, including radiation-induced cellular signaling pathways. This cross-disciplinary work, with biological validation of an evolvable mathematical computational model, will help reduce uncertainties within NSCR and aid risk mitigation for radiation-induced carcinogenesis.

  8. Credit Risk Modeling

    DEFF Research Database (Denmark)

    Lando, David

    Credit risk is today one of the most intensely studied topics in quantitative finance. This book provides an introduction and overview for readers who seek an up-to-date reference to the central problems of the field and to the tools currently used to analyze them. The book is aimed at researchers...... and students in finance, at quantitative analysts in banks and other financial institutions, and at regulators interested in the modeling aspects of credit risk. David Lando considers the two broad approaches to credit risk analysis: that based on classical option pricing models on the one hand...

  9. The INTRACOIN model comparison project

    International Nuclear Information System (INIS)

    Lawson, G.

    1982-01-01

    The International Nuclide Transport Code Intercomparison (INTRACOIN) project is investigating the different models and associated computer codes describing the transport of radionuclides in flowing ground-water following the disposal of solid radioactive wastes in geologic formations. Level I of the project has shown good agreement in the numerical accuracy of most of the codes. In Level II the ability of the codes to model field experiments with radioactive tracers will be compared. Level III will show to what extent the adoption of different models and computer codes for the transport of radionuclides with ground water affects the results of repository assessments. (U.K.)

  10. Multilevel risk factors and developmental assets for internalizing symptoms and self-esteem in disadvantaged adolescents: modeling longitudinal trajectories from the Rural Adaptation Project.

    Science.gov (United States)

    Smokowski, Paul R; Guo, Shenyang; Rose, Roderick; Evans, Caroline B R; Cotter, Katie L; Bacallao, Martica

    2014-11-01

    The current study filled significant gaps in our knowledge of developmental psychopathology by examining the influence of multilevel risk factors and developmental assets on longitudinal trajectories of internalizing symptoms and self-esteem in an exceptionally culturally diverse sample of rural adolescents. Integrating ecological and social capital theories, we explored if positive microsystem transactions are associated with self-esteem while negative microsystem transactions increase the chances of internalizing problems. Data came from the Rural Adaptation Project, a 5-year longitudinal panel study of more than 4,000 middle school students from 28 public schools in two rural, disadvantaged counties in North Carolina. Three-level hierarchical linear modeling models were estimated to predict internalizing symptoms (e.g., depression, anxiety) and self-esteem. Relative to other students, risk for internalizing problems and low self-esteem was elevated for aggressive adolescents, students who were hassled or bullied at school, and those who were rejected by peers or in conflict with their parents. Internalizing problems were also more common among adolescents from socioeconomically disadvantaged families and neighborhoods, among those in schools with more suspensions, in students who reported being pressured by peers, and in youth who required more teacher support. It is likely that these experiences left adolescents disengaged from developing social capital from ecological microsystems (e.g., family, school, peers). On the positive side, support from parents and friends and optimism about the future were key assets associated with lower internalizing symptoms and higher self-esteem. Self-esteem was also positively related to religious orientation, school satisfaction, and future optimism. These variables show active engagement with ecological microsystems. The implications and limitations were discussed.

  11. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  12. Modelling allergenic risk

    DEFF Research Database (Denmark)

    Birot, Sophie

    combines second order Monte-Carlo simulations with Bayesian inferences [13]. An alternative method using second order Monte-Carlo simulations was proposed to take into account the uncertainty from the inputs. The uncertainty propagation from the inputs to the risk of allergic reaction was also evaluated...... countries is proposed. Thus, the allergen risk assessment can be performed cross-nationally and for the correct food group. Then the two probabilistic risk assessment methods usually used were reviewed and compared. First order Monte-Carlo simulations are used in one method [14], whereas the other one......Up to 20 million Europeans suffer from food allergies. Due to the lack of knowledge about why food allergies developed or how to protect allergic consumers from the offending food, food allergy management is mainly based on food allergens avoidance. The iFAAM project (Integrated approaches to Food...

  13. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  14. PECULIARITIES OF ASSESSMENT AND RISK MANAGEMENT IN INNOVATIVE PROJECTS

    Directory of Open Access Journals (Sweden)

    Victor V. Guzhov

    2014-01-01

    Full Text Available The methodological and methodicalbases of risk management in innovativeprojects. Classification of risks. Types of risks depending on the stage of realizationof the innovative project. Investigated thefactors contributing to the emergence ofrisk situations. The basic techniques of risk management of innovation projects.Proposed criteria for the choice of the innovative project to implement in the realsector of the economy.

  15. Using prior risk-related knowledge to support risk management decisions: lessons learnt from a tunneling project.

    Science.gov (United States)

    Cárdenas, Ibsen Chivatá; Al-Jibouri, Saad S H; Halman, Johannes I M; van de Linde, Wim; Kaalberg, Frank

    2014-10-01

    The authors of this article have developed six probabilistic causal models for critical risks in tunnel works. The details of the models' development and evaluation were reported in two earlier publications of this journal. Accordingly, as a remaining step, this article is focused on the investigation into the use of these models in a real case study project. The use of the models is challenging given the need to provide information on risks that usually are both project and context dependent. The latter is of particular concern in underground construction projects. Tunnel risks are the consequences of interactions between site- and project-specific factors. Large variations and uncertainties in ground conditions as well as project singularities give rise to particular risk factors with very specific impacts. These circumstances mean that existing risk information, gathered from previous projects, is extremely difficult to use in other projects. This article considers these issues and addresses the extent to which prior risk-related knowledge, in the form of causal models, as the models developed for the investigation, can be used to provide useful risk information for the case study project. The identification and characterization of the causes and conditions that lead to failures and their interactions as well as their associated probabilistic information is assumed to be risk-related knowledge in this article. It is shown that, irrespective of existing constraints on using information and knowledge from past experiences, construction risk-related knowledge can be transferred and used from project to project in the form of comprehensive models based on probabilistic-causal relationships. The article also shows that the developed models provide guidance as to the use of specific remedial measures by means of the identification of critical risk factors, and therefore they support risk management decisions. Similarly, a number of limitations of the models are

  16. Shedding New Light on Project Portfolio Risk Management

    Directory of Open Access Journals (Sweden)

    Mariusz Hofman

    2017-10-01

    Full Text Available This paper constitutes an innovative attempt to analyse the risks and negative phenomena dependencies within a project portfolio. Based on the available literature, the risks and negative phenomena (that is, the problems with the availability of resources, interpersonal conflicts, irregularities in the portfolio balance, etc. specific to a project portfolio were identified. Theoretical constructs were then used to connect the identified risks with the negative phenomena. Structural equations were used to confirm the existence and quality of these constructs, as well as models describing connections between phenomena. The determination of the structural equations also provided a setting in which statistical methods (χ2, RMSEA and CFI could be used to investigate the level of fit of the constructs and models to the empirical data.

  17. NASA's Aviation Safety and Modeling Project

    Science.gov (United States)

    Chidester, Thomas R.; Statler, Irving C.

    2006-01-01

    The Aviation Safety Monitoring and Modeling (ASMM) Project of NASA's Aviation Safety program is cultivating sources of data and developing automated computer hardware and software to facilitate efficient, comprehensive, and accurate analyses of the data collected from large, heterogeneous databases throughout the national aviation system. The ASMM addresses the need to provide means for increasing safety by enabling the identification and correcting of predisposing conditions that could lead to accidents or to incidents that pose aviation risks. A major component of the ASMM Project is the Aviation Performance Measuring System (APMS), which is developing the next generation of software tools for analyzing and interpreting flight data.

  18. Breast cancer risks and risk prediction models.

    Science.gov (United States)

    Engel, Christoph; Fischer, Christine

    2015-02-01

    BRCA1/2 mutation carriers have a considerably increased risk to develop breast and ovarian cancer. The personalized clinical management of carriers and other at-risk individuals depends on precise knowledge of the cancer risks. In this report, we give an overview of the present literature on empirical cancer risks, and we describe risk prediction models that are currently used for individual risk assessment in clinical practice. Cancer risks show large variability between studies. Breast cancer risks are at 40-87% for BRCA1 mutation carriers and 18-88% for BRCA2 mutation carriers. For ovarian cancer, the risk estimates are in the range of 22-65% for BRCA1 and 10-35% for BRCA2. The contralateral breast cancer risk is high (10-year risk after first cancer 27% for BRCA1 and 19% for BRCA2). Risk prediction models have been proposed to provide more individualized risk prediction, using additional knowledge on family history, mode of inheritance of major genes, and other genetic and non-genetic risk factors. User-friendly software tools have been developed that serve as basis for decision-making in family counseling units. In conclusion, further assessment of cancer risks and model validation is needed, ideally based on prospective cohort studies. To obtain such data, clinical management of carriers and other at-risk individuals should always be accompanied by standardized scientific documentation.

  19. Risk profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought by some to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as insurance and can be utilized at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. This paper reports that either futures or swaps can be used to guarantee or modify product prices, an accomplishment very difficult or impossible to duplicate through other means, particularly with such integrity. Participation in futures or swaps does not necessarily maximize cashflow or present worth, it can either guarantee the price, put a minimum price in place or offer a combination of the above. A project or company can be protected for several years from downside price risk using swaps. Not being subject to market price swings substantially reduces the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cashflows or net incomes

  20. Annual effective dose due to residential radon progeny in Sweden: Evaluations based on current risk projections models and on risk estimates from a nation-wide Swedish epidemiological study

    Energy Technology Data Exchange (ETDEWEB)

    Doi, M [National Inst. of Radiological Sciences, Chiba (Japan); Lagarde, F [Karolinska Inst., Stockholm (Sweden). Inst. of Environmental Medicine; Falk, R; Swedjemark, G A [Swedish Radiation Protection Inst., Stockholm (Sweden)

    1996-12-01

    Effective dose per unit radon progeny exposure to Swedish population in 1992 is estimated by the risk projection model based on the Swedish epidemiological study of radon and lung cancer. The resulting values range from 1.29 - 3.00 mSv/WLM and 2.58 - 5.99 mSv/WLM, respectively. Assuming a radon concentration of 100 Bq/m{sup 3}, an equilibrium factor of 0.4 and an occupancy factor of 0.6 in Swedish houses, the annual effective dose for the Swedish population is estimated to be 0.43 - 1.98 mSv/year, which should be compared to the value of 1.9 mSv/year, according to the UNSCEAR 1993 report. 27 refs, tabs, figs.

  1. Annual effective dose due to residential radon progeny in Sweden: Evaluations based on current risk projections models and on risk estimates from a nation-wide Swedish epidemiological study

    International Nuclear Information System (INIS)

    Doi, M.; Lagarde, F.

    1996-12-01

    Effective dose per unit radon progeny exposure to Swedish population in 1992 is estimated by the risk projection model based on the Swedish epidemiological study of radon and lung cancer. The resulting values range from 1.29 - 3.00 mSv/WLM and 2.58 - 5.99 mSv/WLM, respectively. Assuming a radon concentration of 100 Bq/m 3 , an equilibrium factor of 0.4 and an occupancy factor of 0.6 in Swedish houses, the annual effective dose for the Swedish population is estimated to be 0.43 - 1.98 mSv/year, which should be compared to the value of 1.9 mSv/year, according to the UNSCEAR 1993 report. 27 refs, tabs, figs

  2. Developing a Model for Measuring Risk Exposure Status in IT Outsourcing Projects of Iran Health Sector (Survey Study about Tehran Hospitals and Health Centers

    Directory of Open Access Journals (Sweden)

    ali Heidari

    2013-07-01

    Full Text Available The presented research paper aims to introduce a model in order to identify risks and risk factors associated with outsourcing of information technology in conjunction with health systems, measuring the probability of happening each of them and the loss of each risk. The data used in this research has been gathered from the IT experts of the healthcare sector in Tehran through the questionnaire made by the author. Then the indexes of risk exposure has been classified and ordered in seven factors, using exploratory and confirmatory factor analysis. At the end, the probability and the associated loss of each factor have been measured

  3. A Hybrid MCDM Technique for Risk Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Kajal Chatterjee

    2018-02-01

    Full Text Available Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary to quantify the main risk indicators of the projects. Managing these requires suitable risk mitigation strategies to evaluate and analyse their severity. The existence of information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, to ensure balanced satisfaction of all participants, risk evaluation of these projects can be considered as an important part of the multi-criteria decision-making (MCDM process. In real-life problems, evaluation of project risks is often uncertain and even incomplete, and the prevailing methodologies fail to handle such situations. To address the problem, this paper extends the analytical network process (ANP methodology in the D numbers domain to handle three types of ambiguous information’s, viz. complete, uncertain, and incomplete, and assesses the weight of risk criteria. The D numbers based approach overcomes the deficiencies of the exclusiveness hypothesis and completeness constraint of Dempster–Shafer (D–S theory. Here, preference ratings of the decision matrix for each decision-maker are determined using a D numbers extended consistent fuzzy preference relation (D-CFPR. An extended multi-attributive border approximation area comparison (MABAC method in D numbers is then developed to rank and select the best alternative risk response strategy. Finally, an illustrative example from construction sector is presented to check the feasibility of the proposed approach. For checking the reliability of alternative ranking, a comparative analysis is performed with different MCDM approaches in D numbers domain. Based on different criteria weights, a sensitivity analysis of obtained ranking of the hybrid D-ANP-MABAC model is performed to verify the robustness of the proposed

  4. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  5. Information technology project risk management in Peru

    OpenAIRE

    Del Carpio Gallegos, Javier

    2014-01-01

    This article shows how some principles, uses, and practices of risk management are applied in information technology projects in Peru; in the last four years, in representative sectors like manufacturing, banking, information and communications, academics institutions, construction, government, consulting, services, and others. El presente artículo muestra algunos principios, usos y prácticas de cómo la gestión de riesgos de proyectos de tecnología se ha llevado a cabo en los últimos cuatr...

  6. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  7. Risk managements' communicative effects influencing IT project success

    NARCIS (Netherlands)

    de Bakker, Karel; Boonstra, Albert; Wortmann, Hans

    The central question of this research is if, and how, risk management contributes to the success of IS/IT projects. Risk management is used regularly in IT projects, despite indications in literature that risk management only occasionally contributes to IT project success. Drawing on Habermas we

  8. Models of Credit Risk Measurement

    OpenAIRE

    Hagiu Alina

    2011-01-01

    Credit risk is defined as that risk of financial loss caused by failure by the counterparty. According to statistics, for financial institutions, credit risk is much important than market risk, reduced diversification of the credit risk is the main cause of bank failures. Just recently, the banking industry began to measure credit risk in the context of a portfolio along with the development of risk management started with models value at risk (VAR). Once measured, credit risk can be diversif...

  9. Spiral model pilot project information model

    Science.gov (United States)

    1991-01-01

    The objective was an evaluation of the Spiral Model (SM) development approach to allow NASA Marshall to develop an experience base of that software management methodology. A discussion is presented of the Information Model (IM) that was used as part of the SM methodology. A key concept of the SM is the establishment of an IM to be used by management to track the progress of a project. The IM is the set of metrics that is to be measured and reported throughout the life of the project. These metrics measure both the product and the process to ensure the quality of the final delivery item and to ensure the project met programmatic guidelines. The beauty of the SM, along with the IM, is the ability to measure not only the correctness of the specification and implementation of the requirements but to also obtain a measure of customer satisfaction.

  10. Constrained bayesian inference of project performance models

    OpenAIRE

    Sunmola, Funlade

    2013-01-01

    Project performance models play an important role in the management of project success. When used for monitoring projects, they can offer predictive ability such as indications of possible delivery problems. Approaches for monitoring project performance relies on available project information including restrictions imposed on the project, particularly the constraints of cost, quality, scope and time. We study in this paper a Bayesian inference methodology for project performance modelling in ...

  11. MODELS OF PROJECT REVERSE ENGINEERING

    Directory of Open Access Journals (Sweden)

    Віктор Володимирович ІВАНОВ

    2017-03-01

    Full Text Available Reverse engineering decided important scientific and technical problems of increasing the cost of the existing technical product by transforming it into a product with other features or design. Search ideas of the new application of existing products on the base of heuristic analysis were created. The concept of reverse engineering and its division into three types: conceptual, aggregate and complete was expanded. The use of heuristic methods for reverse engineering concept was showed. The modification model of Reverse engineering based on the model of РМВОК was developed. Our model includes two new phases: identification and transformation. At the identification phase, technical control is made. At the transformation phase, search heuristic idea of the new applied existing technical product was made. The model of execution phase that included heuristic methods, metrological equipment, and CAD/CAM/CAE program complex was created. The model that connected economic indicators of reverse engineering project was developed.

  12. The PASS project architectural model

    International Nuclear Information System (INIS)

    Day, C.T.; Loken, S.; Macfarlane, J.F.

    1994-01-01

    The PASS project has as its goal the implementation of solutions to the foreseen data access problems of the next generation of scientific experiments. The architectural model results from an evaluation of the operational and technical requirements and is described in terms of an abstract reference model, an implementation model and a discussion of some design aspects. The abstract reference model describes a system that matches the requirements in terms of its components and the mechanisms by which they communicate, but does not discuss policy or design issues that would be necessary to match the model to an actual implementation. Some of these issues are discussed, but more detailed design and simulation work will be necessary before choices can be made

  13. Solid Waste Projection Model: Model user's guide

    International Nuclear Information System (INIS)

    Stiles, D.L.; Crow, V.L.

    1990-08-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford company (WHC) specifically to address solid waste management issues at the Hanford Central Waste Complex (HCWC). This document, one of six documents supporting the SWPM system, contains a description of the system and instructions for preparing to use SWPM and operating Version 1 of the model. 4 figs., 1 tab

  14. Future risk assessment by estimating historical heat wave trends with projected heat accumulation using SimCLIM climate model in Pakistan

    Science.gov (United States)

    Nasim, Wajid; Amin, Asad; Fahad, Shah; Awais, Muhammad; Khan, Naeem; Mubeen, Muhammad; Wahid, Abdul; Turan, Veysel; Rehman, Muhammad Habibur; Ihsan, Muhammad Zahid; Ahmad, Shakeel; Hussain, Sajjad; Mian, Ishaq Ahmad; Khan, Bushra; Jamal, Yousaf

    2018-06-01

    Climate change has adverse effects at global, regional and local level. Heat wave events have serious contribution for global warming and natural hazards in Pakistan. Historical (1997-2015) heat wave were analyzed over different provinces (Punjab, Sindh and Baluchistan) of Pakistan to identify the maximum temperature trend. Heat accumulation in Pakistan were simulated by the General Circulation Model (GCM) combined with 3 GHG (Green House Gases) Representative Concentration Pathways (RCPs) (RCP-4.5, 6.0, and 8.5) by using SimCLIM model (statistical downscaling model for future trend projections). Heat accumulation was projected for year 2030, 2060, and 2090 for seasonal and annual analysis in Pakistan. Heat accumulation were projected to increase by the baseline year (1995) was represented in percentage change. Projection shows that Sindh and southern Punjab was mostly affected by heat accumulation. This study identified the rising trend of heat wave over the period (1997-2015) for Punjab, Sindh and Baluchistan (provinces of Pakistan), which identified that most of the meteorological stations in Punjab and Sindh are highly prone to heat waves. According to model projection; future trend of annual heat accumulation, in 2030 was increased 17%, 26%, and 32% but for 2060 the trends were reported by 54%, 49%, and 86% for 2090 showed highest upto 62%, 75%, and 140% for RCP-4.5, RCP-6.0, and RCP-8.5, respectively. While seasonal trends of heat accumulation were projected to maximum values for monsoon and followed by pre-monsoon and post monsoon. Heat accumulation in monsoon may affect the agricultural activities in the region under study.

  15. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  16. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  17. Interconnection of the Degree of Risk and Life Cycle of the “Green Construction” Investment Projects

    OpenAIRE

    Lepehova Natalia; Shoshinov Vitaly

    2017-01-01

    This article analyses interconnection of the degree of risk and the life cycle of the “green building” investment projects, which is structured according to the life cycle. Main stages of the implementation of investment and construction project were considered, interconnection of the project life cycle and the level of project risk were presented in the form of graphical model, proposed a mathematical model of the risk calculation at different stages of the project life cycle, which is a fun...

  18. Network theory-based analysis of risk interactions in large engineering projects

    International Nuclear Information System (INIS)

    Fang, Chao; Marle, Franck; Zio, Enrico; Bocquet, Jean-Claude

    2012-01-01

    This paper presents an approach based on network theory to deal with risk interactions in large engineering projects. Indeed, such projects are exposed to numerous and interdependent risks of various nature, which makes their management more difficult. In this paper, a topological analysis based on network theory is presented, which aims at identifying key elements in the structure of interrelated risks potentially affecting a large engineering project. This analysis serves as a powerful complement to classical project risk analysis. Its originality lies in the application of some network theory indicators to the project risk management field. The construction of the risk network requires the involvement of the project manager and other team members assigned to the risk management process. Its interpretation improves their understanding of risks and their potential interactions. The outcomes of the analysis provide a support for decision-making regarding project risk management. An example of application to a real large engineering project is presented. The conclusion is that some new insights can be found about risks, about their interactions and about the global potential behavior of the project. - Highlights: ► The method addresses the modeling of complexity in project risk analysis. ► Network theory indicators enable other risks than classical criticality analysis to be highlighted. ► This topological analysis improves project manager's understanding of risks and risk interactions. ► This helps project manager to make decisions considering the position in the risk network. ► An application to a real tramway implementation project in a city is provided.

  19. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  20. COGNITIVE MODELING AS A METHOD OF QUALITATIVE ANALYSIS OF IT PROJECTS

    Directory of Open Access Journals (Sweden)

    Інна Ігорівна ОНИЩЕНКО

    2016-03-01

    Full Text Available The example project implementing automated CRM-system demonstrated the possibility and features of cognitive modeling in the qualitative analysis of project risks to determine their additional features. Proposed construction of cognitive models of project risks in information technology within the qualitative risk analysis, additional assessments as a method of ranking risk to characterize the relationship between them. The proposed cognitive model reflecting the relationship between the risk of IT project to assess the negative and the positive impact of certain risks for the remaining risks of project implementation of the automated CRM-system. The ability to influence the risk of a fact of other project risks can increase the priority of risk with low impact on results due to its relationship with other project risks.

  1. Study on Risk Approaches in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  2. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  3. Project finance risks - getting it right first time

    International Nuclear Information System (INIS)

    Bain, F.

    1996-01-01

    Bankers seeking to invest in the construction of new power stations by independent power producers, face greater risks than those lending to companies. Independent risk and insurance advisers are used to assess project risk. ''Project finance'' has become increasingly popular as it allows projects to go ahead that could not be supported from sponsors' own resources. In addition, project finance means that various equity partners can join together in a joint venture company and limit their individual risk. Project finance can be delayed by differences between the needs of sponsors, financiers and insurers. The process can be speeded up by foreknowledge of bankers' requirements. (UK)

  4. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  5. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  6. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  7. Methodology evaluation of innovative projects under risk and uncertainty

    Directory of Open Access Journals (Sweden)

    2012-09-01

    Full Text Available This article deals with problems connected with the assessment of innovative projects in the context of risk and uncertainty, topical issues of evaluation of innovative projects at the present stage of development of the Russian economy. By the example of the solution of the "crossing the river" is considering the possibility of using hierarchical models to address it. In what follows, and compares the priorities of different groups of factors are given by calculating the overall costs and benefits. The paper provides a rationale for combined use of four aspects: the beneficial aspects of the decision (the benefits and opportunities and negative (costs and risks that may lead to the decision in question.

  8. Risk management in methodologies of information technology and communications projects

    Directory of Open Access Journals (Sweden)

    Jonathan Carrillo

    2013-12-01

    Full Text Available (Received: 2013/10/02 - Accepted: 2013/12/13At present there are methodologies that have several alternatives and methods to manage projects of Information and Communication Technologies. However, these do not cover a solution for the technology events that can occur in the industry, government, education, among others. In the technology market there are several models to identify and analyze risks according to relevant aspects of their area of specialty e.g. projects, in software development, communications, information security and business alignment. For this reason, this research conducted an evaluation of risk management activities of the methodologies used mostly to know which of them includes more correspondence with basic elements of IT using a rating scale.

  9. Autonomous, In-Flight Crew Health Risk Management for Exploration-Class Missions: Leveraging the Integrated Medical Model for the Exploration Medical System Demonstration Project

    Science.gov (United States)

    Butler, D. J.; Kerstman, E.; Saile, L.; Myers, J.; Walton, M.; Lopez, V.; McGrath, T.

    2011-01-01

    The Integrated Medical Model (IMM) captures organizational knowledge across the space medicine, training, operations, engineering, and research domains. IMM uses this knowledge in the context of a mission and crew profile to forecast risks to crew health and mission success. The IMM establishes a quantified, statistical relationship among medical conditions, risk factors, available medical resources, and crew health and mission outcomes. These relationships may provide an appropriate foundation for developing an in-flight medical decision support tool that helps optimize the use of medical resources and assists in overall crew health management by an autonomous crew with extremely limited interactions with ground support personnel and no chance of resupply.

  10. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  11. Risk Estimation Modeling and Feasibility Testing for a Mobile eHealth Intervention for Binge Drinking Among Young People: The D-ARIANNA (Digital-Alcohol RIsk Alertness Notifying Network for Adolescents and young adults) Project.

    Science.gov (United States)

    Carrà, Giuseppe; Crocamo, Cristina; Schivalocchi, Alessandro; Bartoli, Francesco; Carretta, Daniele; Brambilla, Giulia; Clerici, Massimo

    2015-01-01

    Binge drinking is common among young people but often relevant risk factors are not recognized. eHealth apps, attractive for young people, may be useful to enhance awareness of this problem. We aimed at developing a current risk estimation model for binge drinking, incorporated into an eHealth app--D-ARIANNA (Digital-Alcohol RIsk Alertness Notifying Network for Adolescents and young adults)--for young people. A longitudinal approach with phase 1 (risk estimation), phase 2 (design), and phase 3 (feasibility) was followed. Risk/protective factors identified from the literature were used to develop a current risk estimation model for binge drinking. Relevant odds ratios were subsequently pooled through meta-analytic techniques with a random-effects model, deriving weighted estimates to be introduced in a final model. A set of questions, matching identified risk factors, were nested in a questionnaire and assessed for wording, content, and acceptability in focus groups involving 110 adolescents and young adults. Ten risk factors (5 modifiable) and 2 protective factors showed significant associations with binge drinking and were included in the model. Their weighted coefficients ranged between -0.71 (school proficiency) and 1.90 (cannabis use). The model, nested in an eHealth app questionnaire, provides in percent an overall current risk score, accompanied by appropriate images. Factors that mostly contribute are shown in summary messages. Minor changes have been realized after focus groups review. Most of the subjects (74%) regarded the eHealth app as helpful to assess binge drinking risk. We could produce an evidence-based eHealth app for young people, evaluating current risk for binge drinking. Its effectiveness will be tested in a large trial.

  12. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  13. Alpha-risk: a European project on the quantification of risks associated with multiple radiation exposures

    International Nuclear Information System (INIS)

    Laurier, D.; Monchaux, G.; Tirmarche, M.; Darby, S.; Cardis, E.; Binks, K.; Hofmann, W.; Muirhead, C.

    2006-01-01

    The Alpha-Risk research project is being conducted within the Sixth European Framework Programme (EC-FP6, 2005 -2008). It aims to improve the quantification of risks associated with multiple exposures, taking into account the contribution of different radionuclides and external exposure using specific organ dose calculations. The Alpha-Risk Consortium involves 18 partners from 9 countries, and is coordinated by the IRSN. Its composition allows a multidisciplinary collaboration between researchers in epidemiology, dosimetry, statistics, modelling and risk assessment. Alpha-Risk brings together major epidemiological studies in Europe, which are able to evaluate long-term health effects of internal exposure from radionuclides. It includes large size cohort and case-control studies, with accurate registration of individual annual exposures: uranium miner studies, studies on lung cancer and indoor radon exposure, and studies of lung cancer and leukaemia among nuclear workers exposed to transuranic nuclides (mainly uranium and plutonium), for whom organ doses will be reconstructed individually. The contribution of experts in dosimetry will allow the calculation of organ doses in presence of multiple exposures (radon decay products, uranium dust and external gamma exposure). Expression of the risk per unit organ dose will make it possible to compare results with those from other populations exposed to external radiation. The multidisciplinary approach of Alpha-Risk promotes the development of coherent and improved methodological approaches regarding risk modelling. A specific work - package is dedicated to the integration of results and their use for risk assessment, especially for radon. Alpha-Risk will contribute to a better understanding of long-term health risks following chronic low doses from internal exposures. The project also has the great potential to help resolve major public health concerns about the effects of low and/or protracted exposures, especially

  14. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  15. W-320 Project thermal modeling

    Energy Technology Data Exchange (ETDEWEB)

    Sathyanarayana, K., Fluor Daniel Hanford

    1997-03-18

    This report summarizes the results of thermal analysis performed to provide a technical basis in support of Project W-320 to retrieve by sluicing the sludge in Tank 241-C-106 and to transfer into Tank 241-AY-102. Prior theraml evaluations in support of Project W-320 safety analysis assumed the availability of 2000 to 3000 CFM, as provided by Tank Farm Operations, for tank floor cooling channels from the secondary ventilation system. As this flow availability has no technical basis, a detailed Tank 241-AY-102 secondary ventilation and floor coating channel flow model was developed and analysis was performed. The results of the analysis show that only about 150 cfm flow is in floor cooLing channels. Tank 241-AY-102 thermal evaluation was performed to determine the necessary cooling flow for floor cooling channels using W-030 primary ventilation system for different quantities of Tank 241-C-106 sludge transfer into Tank 241-AY-102. These sludge transfers meet different options for the project along with minimum required modification of the ventilation system. Also the results of analysis for the amount of sludge transfer using the current system is presented. The effect of sludge fluffing factor, heat generation rate and its distribution between supernatant and sludge in Tank 241-AY-102 on the amount of sludge transfer from Tank 241-C-106 were evaluated and the results are discussed. Also transient thermal analysis was performed to estimate the time to reach the steady state. For a 2 feet sludge transfer, about 3 months time will be requirad to reach steady state. Therefore, for the purpose of process control, a detailed transient thermal analysis using GOTH Computer Code will be required to determine transient response of the sludge in Tank 241-AY-102. Process control considerations are also discussed to eliminate the potential for a steam bump during retrieval and storage in Tanks 241-C-106 and 241-AY-102 respectively.

  16. Risk assessment in energy efficiency projects; Gerenciamento de riscos em projetos de eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Aragao Neto, Raymundo Moniz de

    2003-08-15

    This paper aims to present processes related to risk management in energy efficiency projects, delivered in a performance contracting basis. Introductory comments will be presented about the considered project model, emphasizing the necessity of proper processes of risk management and evaluation and their treatment according methodology developed by PMI - Project Management Institute, grouped in its publication PMBOK - Project Management Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian market reality, as a form of illustrating the considered methodology.

  17. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project

    NARCIS (Netherlands)

    van Os, A.; van Berkel, F.J.F.W.; de Gilder, T.C.; van Dyck, C.; Groenewegen, P.

    2015-01-01

    This paper explores the role of social identity threat in risk discourse in an infrastructure project, and the consequences risk discourse has for cooperation between stakeholders. We show that risks posed a threat to the identity of the project team, resulting in a discourse focused on attributing

  18. 基于区间贝叶斯模型的科技项目风险决策%Risk Decision Making of Science and Technology Project Based on Interval Bayesian Model

    Institute of Scientific and Technical Information of China (English)

    董正国; 王凭慧

    2012-01-01

    Because the science and technology project involves an innovative process with high difficulty and high risk,its risk decision making and risk controlling is regarded as the most important part among the whole project management.As it is difficult to obtain the integrated and accurate information in risk decision making and risk controlling process and most of the data are interval,the conventional Bayesian model cannot deal with this issue.In this paper,the theory of interval data is introduced into the traditional Bayesian model,combining with the theory of possibility,and then the traditional Bayesian model is generalized to the interval data condition.Therefore,this method can be used to deal with the risk decision problem of the technology projects.The analysis of one example shows that this interval Bayesian model commendably can solve the risk decision making of technology project.The content of this study provides a certain reference for the further research in this area.%科技项目是一个高难度和高风险的创新过程,其风险决策与控制是整个项目管理的一项重要内容。鉴于该过程中往往缺乏准确的信息,出现较多的区间数据,利用传统的贝叶斯模型很难对其进行处理。本文运用区间数理论将传统的贝叶斯风险决策模型推广应用到了区间不确定型问题,并结合可能度理论很好地解决了科技项目的风险决策问题。通过具体的实例分析,取得了很好地效果,证实了该理论模型应用于科技项目风险决策的可行性,给相关领域的研究工作提供了参考。

  19. Assessing reservoir performance risk in CO2 storage projects

    International Nuclear Information System (INIS)

    Bowden, A.R.; Rigg, A.

    2005-01-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO 2 ) has been the development of a proper methodology to assess and compare alternative CO 2 injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO 2 , and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO 2 injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO 2 injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs

  20. Process simulation and parametric modeling for strategic project management

    CERN Document Server

    Morales, Peter J

    2013-01-01

    Process Simulation and Parametric Modeling for Strategic Project Management will offer CIOs, CTOs and Software Development Managers, IT Graduate Students an introduction to a set of technologies that will help them understand how to better plan software development projects, manage risk and have better insight into the complexities of the software development process.A novel methodology will be introduced that allows a software development manager to better plan and access risks in the early planning of a project.  By providing a better model for early software development estimation and softw

  1. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  2. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  3. Korean risk assessment model for breast cancer risk prediction.

    Science.gov (United States)

    Park, Boyoung; Ma, Seung Hyun; Shin, Aesun; Chang, Myung-Chul; Choi, Ji-Yeob; Kim, Sungwan; Han, Wonshik; Noh, Dong-Young; Ahn, Sei-Hyun; Kang, Daehee; Yoo, Keun-Young; Park, Sue K

    2013-01-01

    We evaluated the performance of the Gail model for a Korean population and developed a Korean breast cancer risk assessment tool (KoBCRAT) based upon equations developed for the Gail model for predicting breast cancer risk. Using 3,789 sets of cases and controls, risk factors for breast cancer among Koreans were identified. Individual probabilities were projected using Gail's equations and Korean hazard data. We compared the 5-year and lifetime risk produced using the modified Gail model which applied Korean incidence and mortality data and the parameter estimators from the original Gail model with those produced using the KoBCRAT. We validated the KoBCRAT based on the expected/observed breast cancer incidence and area under the curve (AUC) using two Korean cohorts: the Korean Multicenter Cancer Cohort (KMCC) and National Cancer Center (NCC) cohort. The major risk factors under the age of 50 were family history, age at menarche, age at first full-term pregnancy, menopausal status, breastfeeding duration, oral contraceptive usage, and exercise, while those at and over the age of 50 were family history, age at menarche, age at menopause, pregnancy experience, body mass index, oral contraceptive usage, and exercise. The modified Gail model produced lower 5-year risk for the cases than for the controls (p = 0.017), while the KoBCRAT produced higher 5-year and lifetime risk for the cases than for the controls (pKorean women, especially urban women.

  4. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  5. Calculating excess lifetime risk in relative risk models

    International Nuclear Information System (INIS)

    Vaeth, M.; Pierce, D.A.

    1990-01-01

    When assessing the impact of radiation exposure it is common practice to present the final conclusions in terms of excess lifetime cancer risk in a population exposed to a given dose. The present investigation is mainly a methodological study focusing on some of the major issues and uncertainties involved in calculating such excess lifetime risks and related risk projection methods. The age-constant relative risk model used in the recent analyses of the cancer mortality that was observed in the follow-up of the cohort of A-bomb survivors in Hiroshima and Nagasaki is used to describe the effect of the exposure on the cancer mortality. In this type of model the excess relative risk is constant in age-at-risk, but depends on the age-at-exposure. Calculation of excess lifetime risks usually requires rather complicated life-table computations. In this paper we propose a simple approximation to the excess lifetime risk; the validity of the approximation for low levels of exposure is justified empirically as well as theoretically. This approximation provides important guidance in understanding the influence of the various factors involved in risk projections. Among the further topics considered are the influence of a latent period, the additional problems involved in calculations of site-specific excess lifetime cancer risks, the consequences of a leveling off or a plateau in the excess relative risk, and the uncertainties involved in transferring results from one population to another. The main part of this study relates to the situation with a single, instantaneous exposure, but a brief discussion is also given of the problem with a continuous exposure at a low-dose rate

  6. Sharks, Minnows, and Wheelbarrows: Calculus Modeling Projects

    Science.gov (United States)

    Smith, Michael D.

    2011-01-01

    The purpose of this article is to present two very active applied modeling projects that were successfully implemented in a first semester calculus course at Hollins University. The first project uses a logistic equation to model the spread of a new disease such as swine flu. The second project is a human take on the popular article "Do Dogs Know…

  7. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  8. Custom v. Standardized Risk Models

    Directory of Open Access Journals (Sweden)

    Zura Kakushadze

    2015-05-01

    Full Text Available We discuss when and why custom multi-factor risk models are warranted and give source code for computing some risk factors. Pension/mutual funds do not require customization but standardization. However, using standardized risk models in quant trading with much shorter holding horizons is suboptimal: (1 longer horizon risk factors (value, growth, etc. increase noise trades and trading costs; (2 arbitrary risk factors can neutralize alpha; (3 “standardized” industries are artificial and insufficiently granular; (4 normalization of style risk factors is lost for the trading universe; (5 diversifying risk models lowers P&L correlations, reduces turnover and market impact, and increases capacity. We discuss various aspects of custom risk model building.

  9. Modeling foreign exchange risk premium in Armenia

    Czech Academy of Sciences Publication Activity Database

    Poghosyan, T.; Kočenda, E.; Zemčík, Petr

    2008-01-01

    Roč. 44, č. 1 (2008), s. 41-61 ISSN 1540-496X R&D Projects: GA MŠk LC542 Institutional research plan: CEZ:AV0Z70850503 Keywords : foreign exchange risk premium * Armenia * affine term structure models Subject RIV: AH - Economics Impact factor: 0.611, year: 2008

  10. Modeling foreign exchange risk premium in Armenia

    Czech Academy of Sciences Publication Activity Database

    Poghosyan, Tigran; Kočenda, Evžen; Zemčík, P.

    2008-01-01

    Roč. 44, č. 1 (2008), s. 41-61 ISSN 1540-496X R&D Projects: GA MŠk LC542 Institutional research plan: CEZ:MSM0021620846 Keywords : foreign exchange risk premium * Armenia * affine term structure models Subject RIV: AH - Economics Impact factor: 0.611, year: 2008

  11. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  12. Model Risk in Portfolio Optimization

    Directory of Open Access Journals (Sweden)

    David Stefanovits

    2014-08-01

    Full Text Available We consider a one-period portfolio optimization problem under model uncertainty. For this purpose, we introduce a measure of model risk. We derive analytical results for this measure of model risk in the mean-variance problem assuming we have observations drawn from a normal variance mixture model. This model allows for heavy tails, tail dependence and leptokurtosis of marginals. The results show that mean-variance optimization is seriously compromised by model uncertainty, in particular, for non-Gaussian data and small sample sizes. To mitigate these shortcomings, we propose a method to adjust the sample covariance matrix in order to reduce model risk.

  13. The Risks of Investments in Transport Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    O. Pokorná

    2002-01-01

    Full Text Available Investment decisions should not be taken without an in-depth analysis of the risks. This is an important stage in project preparation and should be performed simultaneously with the planning of the financial operations. Infrastructure development requires that project risks and responsibilities be assigned to the public or private entity that is best able to manage them. The risks and their financial impacts are usually not quantified equally by all parties. Each party views the given risks according to the guarantees provided. These guarantees are related to the form of participation in the project.

  14. Risk based modelling

    International Nuclear Information System (INIS)

    Chapman, O.J.V.; Baker, A.E.

    1993-01-01

    Risk based analysis is a tool becoming available to both engineers and managers to aid decision making concerning plant matters such as In-Service Inspection (ISI). In order to develop a risk based method, some form of Structural Reliability Risk Assessment (SRRA) needs to be performed to provide a probability of failure ranking for all sites around the plant. A Probabilistic Risk Assessment (PRA) can then be carried out to combine these possible events with the capability of plant safety systems and procedures, to establish the consequences of failure for the sites. In this way the probability of failures are converted into a risk based ranking which can be used to assist the process of deciding which sites should be included in an ISI programme. This paper reviews the technique and typical results of a risk based ranking assessment carried out for nuclear power plant pipework. (author)

  15. ANALYSIS OF ECONOMIC RISK IN EUROPEAN INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Margareta Stela FLORESCU

    2012-06-01

    Full Text Available Risk is a reality of the economic environment, with consequences which cannot always be foreseen or anticipated. Risk management becomes more stringent as potential exo/endogenous vulnerability factors are rapidly increasing. Identifying risk areas, structuring risk factors and defining their probability, optimal management of resources in order to reduce risk factors, creating alternatives for each high-probability risk factor are part of project risk management. Risk is quantified through probability and incidence and is assessed using quantitative and qualitative methods.

  16. A model-based risk management framework

    Energy Technology Data Exchange (ETDEWEB)

    Gran, Bjoern Axel; Fredriksen, Rune

    2002-08-15

    The ongoing research activity addresses these issues through two co-operative activities. The first is the IST funded research project CORAS, where Institutt for energiteknikk takes part as responsible for the work package for Risk Analysis. The main objective of the CORAS project is to develop a framework to support risk assessment of security critical systems. The second, called the Halden Open Dependability Demonstrator (HODD), is established in cooperation between Oestfold University College, local companies and HRP. The objective of HODD is to provide an open-source test bed for testing, teaching and learning about risk analysis methods, risk analysis tools, and fault tolerance techniques. The Inverted Pendulum Control System (IPCON), which main task is to keep a pendulum balanced and controlled, is the first system that has been established. In order to make risk assessment one need to know what a system does, or is intended to do. Furthermore, the risk assessment requires correct descriptions of the system, its context and all relevant features. A basic assumption is that a precise model of this knowledge, based on formal or semi-formal descriptions, such as UML, will facilitate a systematic risk assessment. It is also necessary to have a framework to integrate the different risk assessment methods. The experiences so far support this hypothesis. This report presents CORAS and the CORAS model-based risk management framework, including a preliminary guideline for model-based risk assessment. The CORAS framework for model-based risk analysis offers a structured and systematic approach to identify and assess security issues of ICT systems. From the initial assessment of IPCON, we also believe that the framework is applicable in a safety context. Further work on IPCON, as well as the experiences from the CORAS trials, will provide insight and feedback for further improvements. (Author)

  17. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  18. Wildfire Risk Main Model

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — The model combines three modeled fire behavior parameters (rate of spread, flame length, crown fire potential) and one modeled ecological health measure (fire regime...

  19. Incorporating the Technology Roadmap Uncertainties into the Project Risk Assessment

    International Nuclear Information System (INIS)

    Bonnema, B.E.

    2002-01-01

    This paper describes two methods, Technology Roadmapping and Project Risk Assessment, which were used to identify and manage the technical risks relating to the treatment of sodium bearing waste at the Idaho National Engineering and Environmental Laboratory. The waste treatment technology under consideration was Direct Vitrification. The primary objective of the Technology Roadmap is to identify technical data uncertainties for the technologies involved and to prioritize the testing or development studies to fill the data gaps. Similarly, project management's objective for a multi-million dollar construction project includes managing all the key risks in accordance to DOE O 413.3 - ''Program and Project Management for the Acquisition of Capital Assets.'' In the early stages, the Project Risk Assessment is based upon a qualitative analysis for each risk's probability and consequence. In order to clearly prioritize the work to resolve the technical issues identified in the Technology Roadmap, the issues must be cross- referenced to the project's Risk Assessment. This will enable the project to get the best value for the cost to mitigate the risks

  20. Projection of radiation-induced cancer risks across time and populations

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1991-01-01

    Various methods can be used to project the risks of radiation-induced cancer estimated in cohort studies beyond the period of follow-up and to other populations. The choice of risk projection model is reviewed based on data from studies such as those of the Japanese atomic bomb survivors and UK ankylosing spondylitis patients given X ray therapy. Risk estimates applicable to a UK population are calculated on the basis of various models, including those developed by the BEIR V Committee. It is emphasised that the continued follow-up of populations such as the Japanese atomic bomb survivors is of great importance in estimating lifetime risks. (author)

  1. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  2. The impact of the human genome project on risk assessment

    International Nuclear Information System (INIS)

    Katarzyna Doerffer; Paul Unrau.

    1996-01-01

    The radiation protection approach to risk assessment assumes that cancer induction following radiation exposure is purely random. Present risk assessment methods derive risk from cancer incidence frequencies in exposed populations and associate disease outcomes totally with the level of exposure to ionizing red aeon. Exposure defines a risk factor that affects the probability of the disease outcome. But cancer risk can be affected by other risk factors such as underlying genetic factors (predisposition) of the exposed organism. These genetic risk factors are now becoming available for incorporation into ionizing radiation risk assessment Progress in the Human Genome Project (HOP) will lead to direct assays to measure the effects of genetic risk determinants in disease outcomes. When all genetic risk determinants are known and incorporated into risk assessment it will be possible to reevaluate the role of ionizing radiation in the causation of cancer. (author)

  3. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  5. Risk Management Improvement of Engineering Projects in Woodworking Industry

    Directory of Open Access Journals (Sweden)

    Simona Bartkutė

    2014-02-01

    Full Text Available Risk is a complex phenomenon that has physical, monetary, cultural and social dimensions. Every company wants tosave money, time, increase quality, optimise manufacturing, but each factor may involve different risks with different influenceto company, its reputation. The aim of the research is to find better risk management improvement decisions, using techniquesthat could help to reduce risk impact in wood-based nonstandard production with shorter project time, smoother design process,lower costs, better project coordination, increased ability to manage problems, technical solutions.

  6. The prostate cancer risk stratification (ProCaRS) project: Recursive partitioning risk stratification analysis

    International Nuclear Information System (INIS)

    Rodrigues, George; Lukka, Himu; Warde, Padraig; Brundage, Michael; Souhami, Luis; Crook, Juanita; Cury, Fabio; Catton, Charles; Mok, Gary; Martin, Andre-Guy; Vigneault, Eric; Morris, Jim; Warner, Andrew; Gonzalez Maldonado, Sandra; Pickles, Tom

    2013-01-01

    Background: The Genitourinary Radiation Oncologists of Canada (GUROC) published a three-group risk stratification (RS) system to assist prostate cancer decision-making in 2001. The objective of this project is to use the ProCaRS database to statistically model the predictive accuracy and clinical utility of a proposed new multi-group RS schema. Methods: The RS analyses utilized the ProCaRS database that consists of 7974 patients from four Canadian institutions. Recursive partitioning analysis (RPA) was utilized to explore the sub-stratification of groups defined by the existing three-group GUROC scheme. 10-fold cross-validated C-indices and the Net Reclassification Index were both used to assess multivariable models and compare the predictive accuracy of existing and proposed RS systems, respectively. Results: The recursive partitioning analysis has suggested that the existing GUROC classification system could be altered to accommodate as many as six separate and statistical unique groups based on differences in BFFS (C-index 0.67 and AUC 0.70). GUROC low-risk patients would be divided into new favorable-low and low-risk groups based on PSA ⩽6 and PSA >6. GUROC intermediate-risk patients can be subclassified into low-intermediate and high-intermediate groups. GUROC high-intermediate-risk is defined as existing GUROC intermediate-risk with PSA >=10 AND either T2b/c disease or T1T2a disease with Gleason 7. GUROC high-risk patients would be subclassified into an additional extreme-risk group (GUROC high-risk AND (positive cores ⩾87.5% OR PSA >30). Conclusions: Proposed RS subcategories have been identified by a RPA of the ProCaRS database

  7. Risk Management and Uncertainty in Large Complex Public Projects

    DEFF Research Database (Denmark)

    Neerup Themsen, Tim; Harty, Chris; Tryggestad, Kjell

    Governmental actors worldwide are promoting risk management as a rational approach to man-age uncertainty and improve the abilities to deliver large complex projects according to budget, time plans, and pre-set project specifications: But what do we know about the effects of risk management...... on the abilities to meet such objectives? Using Callon’s (1998) twin notions of framing and overflowing we examine the implementation of risk management within the Dan-ish public sector and the effects this generated for the management of two large complex pro-jects. We show how the rational framing of risk...... management have generated unexpected costly outcomes such as: the undermining of the longer-term value and societal relevance of the built asset, the negligence of the wider range of uncertainties emerging during project processes, and constraining forms of knowledge. We also show how expert accountants play...

  8. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  9. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  10. Economic optimisation of flood risk management projects

    NARCIS (Netherlands)

    Tsimopoulou, V.

    2015-01-01

    The Netherlands has developed a flood risk management policy based on an economic rationale. After the flood disaster of 1953, when a large area of the south-western part of the country was flooded and more than 1800 people lost their lives, the so-called Delta Committee was installed, whose main

  11. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  12. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    Science.gov (United States)

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  13. Evaluation of Projected Agricultural Climate Risk over the Contiguous US

    Science.gov (United States)

    Zhu, X.; Troy, T. J.; Devineni, N.

    2017-12-01

    Food demands are rising due to an increasing population with changing food preferences, which places pressure on agricultural production. Additionally, climate extremes have recently highlighted the vulnerability of our agricultural system to climate variability. This study seeks to fill two important gaps in current knowledge: how does the widespread response of irrigated crops differ from rainfed and how can we best account for uncertainty in yield responses. We developed a stochastic approach to evaluate climate risk quantitatively to better understand the historical impacts of climate change and estimate the future impacts it may bring about to agricultural system. Our model consists of Bayesian regression, distribution fitting, and Monte Carlo simulation to simulate rainfed and irrigated crop yields at the US county level. The model was fit using historical data for 1970-2010 and was then applied over different climate regions in the contiguous US using the CMIP5 climate projections. The relative importance of many major growing season climate indices, such as consecutive dry days without rainfall or heavy precipitation, was evaluated to determine what climate indices play a role in affecting future crop yields. The statistical modeling framework also evaluated the impact of irrigation by using county-level irrigated and rainfed yields separately. Furthermore, the projected years with negative yield anomalies were specifically evaluated in terms of magnitude, trend and potential climate drivers. This framework provides estimates of the agricultural climate risk for the 21st century that account for the full uncertainty of climate occurrences, range of crop response, and spatial correlation in climate. The results of this study can contribute to decision making about crop choice and water use in an uncertain future climate.

  14. Development of Risk Uncertainty Factors from Historical NASA Projects

    Science.gov (United States)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  15. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  16. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  17. Risk assessment for construction projects of transport infrastructure objects

    Science.gov (United States)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  18. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  19. Planning risk communication for UMTRA project groundwater restoration

    Energy Technology Data Exchange (ETDEWEB)

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  20. Relationships Between Risks in an IT Project Development Portfolio

    NARCIS (Netherlands)

    Kusters, R.J.; Postema, J.J.; Trienekens, J.J.M.; Lavazza, L.; Oberhauser, R.; Martin, A.; Hassine, J.; Gebhart, M.; Jäntti, M.

    2013-01-01

    More and more it is seen that IT (Information Technology) projects are managed as a whole as part of a IT project portfolio. As one of the arguments for doing so, risk management at the portfolio level was identified as one of the advantages that could benefit from this. This was based on the notion

  1. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  2. Planning risk communication for UMTRA project groundwater restoration

    International Nuclear Information System (INIS)

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  3. Flash flood forecasting, warning and risk management: the HYDRATE project

    International Nuclear Information System (INIS)

    Borga, M.; Anagnostou, E.N.; Bloeschl, G.; Creutin, J.-D.

    2011-01-01

    Highlights: → We characterize flash flood events in various regions of Europe. → We provide guidance to improve observations and monitoring of flash floods. → Flash floods are associated to orography and are influenced by initial soil moisture conditions. → Models for flash flood forecasting and flash flood hazard assessment are illustrated and discussed. → We examine implications for flood risk policy and discuss recommendations received from end users. - Abstract: The management of flash flood hazards and risks is a critical component of public safety and quality of life. Flash-floods develop at space and time scales that conventional observation systems are not able to monitor for rainfall and river discharge. Consequently, the atmospheric and hydrological generating mechanisms of flash-floods are poorly understood, leading to highly uncertain forecasts of these events. The objective of the HYDRATE project has been to improve the scientific basis of flash flood forecasting by advancing and harmonising a European-wide innovative flash flood observation strategy and developing a coherent set of technologies and tools for effective early warning systems. To this end, the project included actions on the organization of the existing flash flood data patrimony across Europe. The final aim of HYDRATE was to enhance the capability of flash flood forecasting in ungauged basins by exploiting the extended availability of flash flood data and the improved process understanding. This paper provides a review of the work conducted in HYDRATE with a special emphasis on how this body of research can contribute to guide the policy-life cycle concerning flash flood risk management.

  4. Multilevel joint competing risk models

    Science.gov (United States)

    Karunarathna, G. H. S.; Sooriyarachchi, M. R.

    2017-09-01

    Joint modeling approaches are often encountered for different outcomes of competing risk time to event and count in many biomedical and epidemiology studies in the presence of cluster effect. Hospital length of stay (LOS) has been the widely used outcome measure in hospital utilization due to the benchmark measurement for measuring multiple terminations such as discharge, transferred, dead and patients who have not completed the event of interest at the follow up period (censored) during hospitalizations. Competing risk models provide a method of addressing such multiple destinations since classical time to event models yield biased results when there are multiple events. In this study, the concept of joint modeling has been applied to the dengue epidemiology in Sri Lanka, 2006-2008 to assess the relationship between different outcomes of LOS and platelet count of dengue patients with the district cluster effect. Two key approaches have been applied to build up the joint scenario. In the first approach, modeling each competing risk separately using the binary logistic model, treating all other events as censored under the multilevel discrete time to event model, while the platelet counts are assumed to follow a lognormal regression model. The second approach is based on the endogeneity effect in the multilevel competing risks and count model. Model parameters were estimated using maximum likelihood based on the Laplace approximation. Moreover, the study reveals that joint modeling approach yield more precise results compared to fitting two separate univariate models, in terms of AIC (Akaike Information Criterion).

  5. Effect of risk aversion on prioritizing conservation projects.

    Science.gov (United States)

    Tulloch, Ayesha I T; Maloney, Richard F; Joseph, Liana N; Bennett, Joseph R; Di Fonzo, Martina M I; Probert, William J M; O'Connor, Shaun M; Densem, Jodie P; Possingham, Hugh P

    2015-04-01

    Conservation outcomes are uncertain. Agencies making decisions about what threat mitigation actions to take to save which species frequently face the dilemma of whether to invest in actions with high probability of success and guaranteed benefits or to choose projects with a greater risk of failure that might provide higher benefits if they succeed. The answer to this dilemma lies in the decision maker's aversion to risk--their unwillingness to accept uncertain outcomes. Little guidance exists on how risk preferences affect conservation investment priorities. Using a prioritization approach based on cost effectiveness, we compared 2 approaches: a conservative probability threshold approach that excludes investment in projects with a risk of management failure greater than a fixed level, and a variance-discounting heuristic used in economics that explicitly accounts for risk tolerance and the probabilities of management success and failure. We applied both approaches to prioritizing projects for 700 of New Zealand's threatened species across 8303 management actions. Both decision makers' risk tolerance and our choice of approach to dealing with risk preferences drove the prioritization solution (i.e., the species selected for management). Use of a probability threshold minimized uncertainty, but more expensive projects were selected than with variance discounting, which maximized expected benefits by selecting the management of species with higher extinction risk and higher conservation value. Explicitly incorporating risk preferences within the decision making process reduced the number of species expected to be safe from extinction because lower risk tolerance resulted in more species being excluded from management, but the approach allowed decision makers to choose a level of acceptable risk that fit with their ability to accommodate failure. We argue for transparency in risk tolerance and recommend that decision makers accept risk in an adaptive management

  6. Prostate Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing prostate cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  7. Colorectal Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing colorectal cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  8. Esophageal Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing esophageal cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  9. Bladder Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing bladder cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  10. Lung Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing lung cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  11. Breast Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing breast cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  12. Pancreatic Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing pancreatic cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  13. Ovarian Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing ovarian cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  14. Liver Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing liver cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  15. Testicular Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of testicular cervical cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  16. Cervical Cancer Risk Prediction Models

    Science.gov (United States)

    Developing statistical models that estimate the probability of developing cervical cancer over a defined period of time will help clinicians identify individuals at higher risk of specific cancers, allowing for earlier or more frequent screening and counseling of behavioral changes to decrease risk.

  17. Risk modelling in portfolio optimization

    Science.gov (United States)

    Lam, W. H.; Jaaman, Saiful Hafizah Hj.; Isa, Zaidi

    2013-09-01

    Risk management is very important in portfolio optimization. The mean-variance model has been used in portfolio optimization to minimize the investment risk. The objective of the mean-variance model is to minimize the portfolio risk and achieve the target rate of return. Variance is used as risk measure in the mean-variance model. The purpose of this study is to compare the portfolio composition as well as performance between the optimal portfolio of mean-variance model and equally weighted portfolio. Equally weighted portfolio means the proportions that are invested in each asset are equal. The results show that the portfolio composition of the mean-variance optimal portfolio and equally weighted portfolio are different. Besides that, the mean-variance optimal portfolio gives better performance because it gives higher performance ratio than the equally weighted portfolio.

  18. Models for Pesticide Risk Assessment

    Science.gov (United States)

    EPA considers the toxicity of the pesticide as well as the amount of pesticide to which a person or the environments may be exposed in risk assessment. Scientists use mathematical models to predict pesticide concentrations in exposure assessment.

  19. Sustainability Risk Evaluation for Large-Scale Hydropower Projects with Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Weiyao Tang

    2018-01-01

    Full Text Available As large-scale hydropower projects are influenced by many factors, risk evaluations are complex. This paper considers a hydropower project as a complex system from the perspective of sustainability risk, and divides it into three subsystems: the natural environment subsystem, the eco-environment subsystem and the socioeconomic subsystem. Risk-related factors and quantitative dimensions of each subsystem are comprehensively analyzed considering uncertainty of some quantitative dimensions solved by hybrid uncertainty methods, including fuzzy (e.g., the national health degree, the national happiness degree, the protection of cultural heritage, random (e.g., underground water levels, river width, and fuzzy random uncertainty (e.g., runoff volumes, precipitation. By calculating the sustainability risk-related degree in each of the risk-related factors, a sustainable risk-evaluation model is built. Based on the calculation results, the critical sustainability risk-related factors are identified and targeted to reduce the losses caused by sustainability risk factors of the hydropower project. A case study at the under-construction Baihetan hydropower station is presented to demonstrate the viability of the risk-evaluation model and to provide a reference for the sustainable risk evaluation of other large-scale hydropower projects.

  20. K3 projective models in scrolls

    CERN Document Server

    Johnsen, Trygve

    2004-01-01

    The exposition studies projective models of K3 surfaces whose hyperplane sections are non-Clifford general curves. These models are contained in rational normal scrolls. The exposition supplements standard descriptions of models of general K3 surfaces in projective spaces of low dimension, and leads to a classification of K3 surfaces in projective spaces of dimension at most 10. The authors bring further the ideas in Saint-Donat's classical article from 1974, lifting results from canonical curves to K3 surfaces and incorporating much of the Brill-Noether theory of curves and theory of syzygies developed in the mean time.

  1. The Strategic Risk Management at Different Stages of Innovation Project

    OpenAIRE

    Pysmak Viktoriia O.

    2017-01-01

    This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried...

  2. A Model of Project and Organisational Dynamics

    Directory of Open Access Journals (Sweden)

    Jenny Leonard

    2012-04-01

    Full Text Available The strategic, transformational nature of many information systems projects is now widely understood. Large-scale implementations of systems are known to require significant management of organisational change in order to be successful. Moreover, projects are rarely executed in isolation – most organisations have a large programme of projects being implemented at any one time. However, project and value management methodologies provide ad hoc definitions of the relationship between a project and its environment. This limits the ability of an organisation to manage the larger dynamics between projects and organisations, over time, and between projects. The contribution of this paper, therefore, is to use literature on organisational theory to provide a more systematic understanding of this area. The organisational facilitators required to obtain value from a project are categorised, and the processes required to develop those facilitators are defined. This formalisation facilitates generalisation between projects and highlights any time and path dependencies required in developing organisational facilitators. The model therefore has the potential to contribute to the development of IS project management theory within dynamic organisational contexts. Six cases illustrate how this model could be used.

  3. WAYS TO IMPROVE RISK MANAGEMENT IN COMPLEX PROJECTS

    Directory of Open Access Journals (Sweden)

    Emilia IORDACHE

    2012-01-01

    Full Text Available Risk is present in all human activities; it can be associated with health, security, economy or environment. The goal of risk management is to control, prevent or decrease potential damages. Technically speaking, risk management means all the activities coordinated so as to orient and monitor an organization from the risk perspective. Risk management helps formulate the most adequate decisions by taking account of uncertainties and their effects upon the accomplishment of proposed goals, and argues the need to lay down and implement coercive, preventive actions typical of the management of a company. The benefits of good risk management and also the consequences of bad management shall undoubtedly be felt by an organization’s board, employees, shareholders, customers as well as by all other entities concerned with organizational performance. Projects generally include a number of risks in common with those in business as well as certain typical ones. In complex projects, it is this very feature – complexity – which generates the need to implement risk management for the purpose to diminish, remove, and monitor the risks which can influence the development of a project.

  4. THE FINANCIAL TOOLS FOR COVER POLITICAL RISKS IN PROJECT FINANCE

    Directory of Open Access Journals (Sweden)

    S. Naumenkova

    2016-10-01

    Full Text Available This article examines the risk-mitigation in public-private partnership. Today Ukraine is ranked as "CRT-5 country" and has high levels of economic and political risk. Political risk grows steadily because of financial and political instability in Ukraine. We conclude that investors continue to rank political risk as a key obstacle to long-term investing. The tools for cover many types of political risks such as war, terrorism, civil disturbance, breach of contract, export or operating license cancellation, currency inconvertibility and transfer restriction, change of laws and regulations etc. are described by authors. We focus on the advantages of World Bank Group Guarantee products. The guarantee instruments of the three WBG institutions for cover political risks under different circumstances are the most suitable for public-private partnership in Ukraine. In this article the political risk-mitigation with IBRD Partial Risk Guarantee put forward by authors for PPP projects in Ukraine.

  5. Modeling renewable energy company risk

    International Nuclear Information System (INIS)

    Sadorsky, Perry

    2012-01-01

    The renewable energy sector is one of the fastest growing components of the energy industry and along with this increased demand for renewable energy there has been an increase in investing and financing activities. The tradeoff between risk and return in the renewable energy sector is, however, precarious. Renewable energy companies are often among the riskiest types of companies to invest in and for this reason it is necessary to have a good understanding of the risk factors. This paper uses a variable beta model to investigate the determinants of renewable energy company risk. The empirical results show that company sales growth has a negative impact on company risk while oil price increases have a positive impact on company risk. When oil price returns are positive and moderate, increases in sales growth can offset the impact of oil price returns and this leads to lower systematic risk.

  6. Teaching mathematical modelling through project work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2006-01-01

    are reported in manners suitable for internet publication for colleagues. The reports and the related discussions reveal interesting dilemmas concerning the teaching of mathematical modelling and how to cope with these through “setting the scene” for the students modelling projects and through dialogues......The paper presents and analyses experiences from developing and running an in-service course in project work and mathematical modelling for mathematics teachers in the Danish gymnasium, e.g. upper secondary level, grade 10-12. The course objective is to support the teachers to develop, try out...... in their own classes, evaluate and report a project based problem oriented course in mathematical modelling. The in-service course runs over one semester and includes three seminars of 3, 1 and 2 days. Experiences show that the course objectives in general are fulfilled and that the course projects...

  7. Musculoskeletal Modelling and the Physiome Project

    NARCIS (Netherlands)

    Fernandez, Justin; Zhang, Ju; Shim, Vickie; Munro, Jacob T.; Sartori, Massimo; Besier, Thor; Lloyd, David G.; Nickerson, David P.; Hunter, Peter; Pivonka, Peter

    2018-01-01

    This chapter presents developments as part of the International Union of Physiological Sciences (IUPS) Physiome Project. Models are multiscale, multispatial and multiphysics, hence, suitable numerical tools and platforms have been developed to address these challenges for the musculoskeletal system.

  8. Quark shell model using projection operators

    International Nuclear Information System (INIS)

    Ullah, N.

    1988-01-01

    Using the projection operators in the quark shell model, the wave functions for proton are calculated and expressions for calculating the wave function of neutron and also magnetic moment of proton and neutron are derived. (M.G.B.)

  9. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  10. Developing Project Duration Models in Software Engineering

    Institute of Scientific and Technical Information of China (English)

    Pierre Bourque; Serge Oligny; Alain Abran; Bertrand Fournier

    2007-01-01

    Based on the empirical analysis of data contained in the International Software Benchmarking Standards Group(ISBSG) repository, this paper presents software engineering project duration models based on project effort. Duration models are built for the entire dataset and for subsets of projects developed for personal computer, mid-range and mainframeplatforms. Duration models are also constructed for projects requiring fewer than 400 person-hours of effort and for projectsre quiring more than 400 person-hours of effort. The usefulness of adding the maximum number of assigned resources as asecond independent variable to explain duration is also analyzed. The opportunity to build duration models directly fromproject functional size in function points is investigated as well.

  11. Modelling the Reduction of Project Making Duration

    Directory of Open Access Journals (Sweden)

    Oleinik Pavel

    2017-01-01

    Full Text Available The article points out why earlier patterns of investment process were ineffective in developing the construction projects and shows sources for reducing of its total duration. It describes the procedure of statistical modeling and obtaining medium-term time parameters required for modern pattern of project-making; offers design formulas for assessment of total time required for project-making as well as for its main stages; reveals advantage of modern system of project-making against traditional one by comparing indicators of their duration.

  12. Project transition to risk based corrective action

    International Nuclear Information System (INIS)

    Judge, J.M.; Cormier, S.L.

    1996-01-01

    Many states have adopted or are considering the adoption of the America Society for Testing and Materials (ASTM) Standard E 1739, Standard for Risk Based Corrective Action (RBCA) Applied to Petroleum Release Sites. This standard is being adopted to regulate leaking underground storage tank (LUST) sites. The case studies of two LUST sites in Michigan will be presented to demonstrate the decision making process and limiting factors involved in transitioning sites to the RBCA program. Both of these case studies had been previously investigated and one was actively remediated. The first case study involves a private petroleum facility where soil and ground water have been impacted. Remediation involved a ground water pump and treat system. Subsequent monitoring during system operation indicated that analytical data were still above the Tier 1 RBSLs but below the Tier 2 SSTLs. The closure strategy that was developed was based on the compounds of concern that were below the SSTLs. A deed restriction was also developed for the site as an institutional control. The second LUST site exhibited BTEX concentrations in soil and ground water above the Tier 1 RBSLs. Due to the exceedence of the Tier 1 RBSLs, the second site required a Tier 2 assessment to develop SSTLs as remedial objectives and remove hot spots in the soil and treat the ground water to achieve closure. Again, a deed restriction was instituted along with a performance monitoring plan

  13. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  14. The Study on Stage Financing Model of IT Project Investment

    Directory of Open Access Journals (Sweden)

    Si-hua Chen

    2014-01-01

    Full Text Available Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model.

  15. The Study on Stage Financing Model of IT Project Investment

    Science.gov (United States)

    Xu, Sheng-hua; Xiong, Neal N.

    2014-01-01

    Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model. PMID:25147845

  16. The study on stage financing model of IT project investment.

    Science.gov (United States)

    Chen, Si-hua; Xu, Sheng-hua; Lee, Changhoon; Xiong, Neal N; He, Wei

    2014-01-01

    Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model.

  17. POMP - Pervasive Object Model Project

    DEFF Research Database (Denmark)

    Schougaard, Kari Rye; Schultz, Ulrik Pagh

    The focus on mobile devices is continuously increasing, and improved device connectivity enables the construction of pervasive computing systems composed of heterogeneous collections of devices. Users who employ different devices throughout their daily activities naturally expect their applications...... computing environment. This system, named POM (Pervasive Object Model), supports applications split into coarse-grained, strongly mobile units that communicate using method invocations through proxies. We are currently investigating efficient execution of mobile applications, scalability to suit...

  18. Integrating semantic data models with project management

    Energy Technology Data Exchange (ETDEWEB)

    Wachter, R

    1982-01-01

    Summary form only given, as follows. The development of a data model for a project on the test and certification of computer-based information systems required a more expressive data model than that supplied by either the network, hierarchical or relational models. A data model was developed to describe the work environment and the work itself. This model is based on the entity-relationship data model of Chen and on heuristic principles of knowledge organisation used in artificial intelligence. The ER data model is reviewed and the extensions to the model are discussed.

  19. EXPENSES FORECASTING MODEL IN UNIVERSITY PROJECTS PLANNING

    Directory of Open Access Journals (Sweden)

    Sergei A. Arustamov

    2016-11-01

    Full Text Available The paper deals with mathematical model presentation of cash flows in project funding. We describe different types of expenses linked to university project activities. Problems of project budgeting that contribute most uncertainty have been revealed. As an example of the model implementation we consider calculation of vacation allowance expenses for project participants. We define problems of forecast for funds reservation: calculation based on methodology established by the Ministry of Education and Science calculation according to the vacation schedule and prediction of the most probable amount. A stochastic model for vacation allowance expenses has been developed. We have proposed methods and solution of the problems that increase the accuracy of forecasting for funds reservation based on 2015 data.

  20. Statistically downscaled climate projections to support evaluating climate change risks for hydropower

    International Nuclear Information System (INIS)

    Brekke, L.

    2008-01-01

    This paper described a web-served public access archive of down-scaled climate projections developed as a tool for water managers of river and hydropower systems. The archive provided access to climate projection data at basin-relevant resolution and included an extensive compilation of down-scale climate projects designed to support risk-based adaptation planning. Downscaled translations of 112 contemporary climate projections produced using the World Climate Research Program's coupled model intercomparison project were also included. Datasets for the coupled model included temperature and precipitation, monthly time-steps, and geographic coverage for the United States and portions of Mexico and Canada. It was concluded that the archive will be used to develop risk-based studies on shifts in seasonal patterns, changes in mean annual runoff, and associated responses in water resources and hydroelectric power management. Case studies demonstrating reclamation applications of archive content and potential applications for hydroelectric power production impacts were included. tabs., figs

  1. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  2. Model based risk assessment - the CORAS framework

    Energy Technology Data Exchange (ETDEWEB)

    Gran, Bjoern Axel; Fredriksen, Rune; Thunem, Atoosa P-J.

    2004-04-15

    Traditional risk analysis and assessment is based on failure-oriented models of the system. In contrast to this, model-based risk assessment (MBRA) utilizes success-oriented models describing all intended system aspects, including functional, operational and organizational aspects of the target. The target models are then used as input sources for complementary risk analysis and assessment techniques, as well as a basis for the documentation of the assessment results. The EU-funded CORAS project developed a tool-supported methodology for the application of MBRA in security-critical systems. The methodology has been tested with successful outcome through a series of seven trial within the telemedicine and ecommerce areas. The CORAS project in general and the CORAS application of MBRA in particular have contributed positively to the visibility of model-based risk assessment and thus to the disclosure of several potentials for further exploitation of various aspects within this important research field. In that connection, the CORAS methodology's possibilities for further improvement towards utilization in more complex architectures and also in other application domains such as the nuclear field can be addressed. The latter calls for adapting the framework to address nuclear standards such as IEC 60880 and IEC 61513. For this development we recommend applying a trial driven approach within the nuclear field. The tool supported approach for combining risk analysis and system development also fits well with the HRP proposal for developing an Integrated Design Environment (IDE) providing efficient methods and tools to support control room systems design. (Author)

  3. The Strategic Risk Management at Different Stages of Innovation Project

    Directory of Open Access Journals (Sweden)

    Pysmak Viktoriia O.

    2017-03-01

    Full Text Available This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried out. The concept of «innovation project» has been considered, its features and characteristics have been allocated. The basic tools of the strategic management of enterprise in current conditions have been described. The basic principles of the strategic risk management of innovation activity have been formulated. A scheme with allocating the stages of innovation activity and the risks involved has been elaborated, taking into consideration the factors of occurrence of risks. The main groups of management strategies have been allocated. The tasks facing the managerial board in the process of the strategic risk management at every stage of the innovation project have been formulated.

  4. Assessment of Transport Projects: Risk Analysis and Decision Support

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2008-01-01

    functions. New research proved that specifically two impacts stood out in transport project assessment, namely, travel time savings and construction costs. The final concern of this study has been the fitting of distributions, e.g. by the use of data from major databases developed in which Optimism Bias...... choosing probability distributions and performing real term data fits. The perspective of this Ph.D. study presents newer and better understanding of assigning risks within assessment of transport projects....

  5. Information risk and security modeling

    Science.gov (United States)

    Zivic, Predrag

    2005-03-01

    This research paper presentation will feature current frameworks to addressing risk and security modeling and metrics. The paper will analyze technical level risk and security metrics of Common Criteria/ISO15408, Centre for Internet Security guidelines, NSA configuration guidelines and metrics used at this level. Information IT operational standards view on security metrics such as GMITS/ISO13335, ITIL/ITMS and architectural guidelines such as ISO7498-2 will be explained. Business process level standards such as ISO17799, COSO and CobiT will be presented with their control approach to security metrics. Top level, the maturity standards such as SSE-CMM/ISO21827, NSA Infosec Assessment and CobiT will be explored and reviewed. For each defined level of security metrics the research presentation will explore the appropriate usage of these standards. The paper will discuss standards approaches to conducting the risk and security metrics. The research findings will demonstrate the need for common baseline for both risk and security metrics. This paper will show the relation between the attribute based common baseline and corporate assets and controls for risk and security metrics. IT will be shown that such approach spans over all mentioned standards. The proposed approach 3D visual presentation and development of the Information Security Model will be analyzed and postulated. Presentation will clearly demonstrate the benefits of proposed attributes based approach and defined risk and security space for modeling and measuring.

  6. Cabin Environment Physics Risk Model

    Science.gov (United States)

    Mattenberger, Christopher J.; Mathias, Donovan Leigh

    2014-01-01

    This paper presents a Cabin Environment Physics Risk (CEPR) model that predicts the time for an initial failure of Environmental Control and Life Support System (ECLSS) functionality to propagate into a hazardous environment and trigger a loss-of-crew (LOC) event. This physics-of failure model allows a probabilistic risk assessment of a crewed spacecraft to account for the cabin environment, which can serve as a buffer to protect the crew during an abort from orbit and ultimately enable a safe return. The results of the CEPR model replace the assumption that failure of the crew critical ECLSS functionality causes LOC instantly, and provide a more accurate representation of the spacecraft's risk posture. The instant-LOC assumption is shown to be excessively conservative and, moreover, can impact the relative risk drivers identified for the spacecraft. This, in turn, could lead the design team to allocate mass for equipment to reduce overly conservative risk estimates in a suboptimal configuration, which inherently increases the overall risk to the crew. For example, available mass could be poorly used to add redundant ECLSS components that have a negligible benefit but appear to make the vehicle safer due to poor assumptions about the propagation time of ECLSS failures.

  7. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    Directory of Open Access Journals (Sweden)

    Özlem Tüz

    2013-12-01

    Full Text Available Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of the money. In this study, monitoring and measuring of the leverage ratio because of the displacement in cash inflows of construction projects which uses high leverage and low cash to do business in the sector is targeted. Cash need because of drifting the cash inflows may be seen due to the model. Work should be done in the early stages of the project with little capital but in the later stages, rapidly growing capital need arises.The values obtained from the model may be used to supply the capital held in the right time by anticipating the risks because of the delay in cashflow of construction projects which uses high leverage ratio.

  8. Streamline Your Project: A Lifecycle Model.

    Science.gov (United States)

    Viren, John

    2000-01-01

    Discusses one approach to project organization providing a baseline lifecycle model for multimedia/CBT development. This variation of the standard four-phase model of Analysis, Design, Development, and Implementation includes a Pre-Analysis phase, called Definition, and a Post-Implementation phase, known as Maintenance. Each phase is described.…

  9. Model county ordinance for wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Bain, D.A. [Oregon Office of Energy, Portland, OR (United States)

    1997-12-31

    Permitting is a crucial step in the development cycle of a wind project and permits affect the timing, cost, location, feasibility, layout, and impacts of wind projects. Counties often have the lead responsibility for permitting yet few have appropriate siting regulations for wind projects. A model ordinance allows a county to quickly adopt appropriate permitting procedures. The model county wind ordinance developed for use by northwest states is generally applicable across the country and counties seeking to adopt siting or zoning regulations for wind will find it a good starting place. The model includes permitting procedures for wind measurement devices and two types of wind systems. Both discretionary and nondiscretionary standards apply to wind systems and a conditional use permit would be issued. The standards, criteria, conditions for approval, and process procedures are defined for each. Adaptation examples for the four northwest states are provided along with a model Wind Resource Overlay Zone.

  10. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  11. Fuzzy audit risk modeling algorithm

    Directory of Open Access Journals (Sweden)

    Zohreh Hajihaa

    2011-07-01

    Full Text Available Fuzzy logic has created suitable mathematics for making decisions in uncertain environments including professional judgments. One of the situations is to assess auditee risks. During recent years, risk based audit (RBA has been regarded as one of the main tools to fight against fraud. The main issue in RBA is to determine the overall audit risk an auditor accepts, which impact the efficiency of an audit. The primary objective of this research is to redesign the audit risk model (ARM proposed by auditing standards. The proposed model of this paper uses fuzzy inference systems (FIS based on the judgments of audit experts. The implementation of proposed fuzzy technique uses triangular fuzzy numbers to express the inputs and Mamdani method along with center of gravity are incorporated for defuzzification. The proposed model uses three FISs for audit, inherent and control risks, and there are five levels of linguistic variables for outputs. FISs include 25, 25 and 81 rules of if-then respectively and officials of Iranian audit experts confirm all the rules.

  12. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  13. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  14. Incorporating risk in the economic evaluation of road infrastructure projects

    CSIR Research Space (South Africa)

    Schutte, IC

    2009-05-26

    Full Text Available credibility to the process and ensure strategic decisions that are more defendable. In this study, a prosedure for incorporating risk is suggested. It involves the identification of inputs critical to the economic success of the project, the quantification...

  15. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  16. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  17. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  18. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  19. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  20. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  1. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  2. Model of MSD Risk Assessment at Workplace

    OpenAIRE

    K. Sekulová; M. Šimon

    2015-01-01

    This article focuses on upper-extremity musculoskeletal disorders risk assessment model at workplace. In this model are used risk factors that are responsible for musculoskeletal system damage. Based on statistic calculations the model is able to define what risk of MSD threatens workers who are under risk factors. The model is also able to say how MSD risk would decrease if these risk factors are eliminated.

  3. PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL

    Directory of Open Access Journals (Sweden)

    S. Munapo

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model. Even though network models have been successfully used in project management so far, there are weaknesses associated with the use. A network is not easy to generate, and dummies that are usually associated with it make the network diagram complex – and dummy activities have no meaning in the original project management problem. The network model for projects can be avoided while still obtaining all the useful information that is required for project management. What are required are the activities, their accurate durations, and their predecessors.

    AFRIKAANSE OPSOMMING: Die navorsing beskryf ’n nuwerwetse metode vir die ontleding en bestuur van die sekwensiële aktiwiteite van projekte. Die voorgestelde metode bepaal kritiese aktiwiteite, die kritieke pad, aanvangstye, speling, verhasing, en ander groothede sonder die gebruik van ’n netwerkmodel. Die metode funksioneer bevredigend in die praktyk, en omseil die administratiewe rompslomp van die tradisionele netwerkmodelle.

  4. Risk reduction of international mining projects by means of investor consortia and diversification of external financing

    International Nuclear Information System (INIS)

    Kirchner, C.

    1982-01-01

    Investors and creditors of international mining projects bear specific risks which may be reduced by means of forming investor and financing consortia. Risk is defined for each actor separately. Project risk and investor risk respectively credit risk are useful categories in order to analyze risk reduction. In each case formation of consortia has a positive influence on the economic viability of the project, and thus reduces the project risk. Furthermore, formation of consortia leads to better compliance of the host country of the mining project with the project and financing agreements. Thus, investor and credit risk may be reduced. (orig.) [de

  5. Risk management for engineering projects procedures, methods and tools

    CERN Document Server

    Munier, Nolberto

    2014-01-01

    Many people see risk in engineering projects as an imprecise and nebulous problem - something that exists, is feared and is impossible to deal with. Nothing could be further from the truth. While risk is certainly ubiquitous, sometimes difficult to detect, and cannot always be completely avoided, it can generally be mitigated, reduced or prevented through timely analysis and action.   This book covers the entire process of risk management by providing methodologies for determining the sources of project risk, and once threats have been identified, managing them through:   ·         identification and assessment (probability, relative importance, variables, risk breakdown structure, etc.) ·         implementation of measures for their prevention, reduction or mitigation ·         evaluation of impacts and quantification of risks ·         establishment of control measures   It also considers sensitivity analysis to determine the influence of uncertain parameters values ...

  6. Testing Software Development Project Productivity Model

    Science.gov (United States)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  7. Deep Uncertainty Surrounding Coastal Flood Risk Projections: A Case Study for New Orleans

    Science.gov (United States)

    Wong, Tony E.; Keller, Klaus

    2017-10-01

    Future sea-level rise drives severe risks for many coastal communities. Strategies to manage these risks hinge on a sound characterization of the uncertainties. For example, recent studies suggest that large fractions of the Antarctic ice sheet (AIS) may rapidly disintegrate in response to rising global temperatures, leading to potentially several meters of sea-level rise during the next few centuries. It is deeply uncertain, for example, whether such an AIS disintegration will be triggered, how much this would increase sea-level rise, whether extreme storm surges intensify in a warming climate, or which emissions pathway future societies will choose. Here, we assess the impacts of these deep uncertainties on projected flooding probabilities for a levee ring in New Orleans, LA. We use 18 scenarios, presenting probabilistic projections within each one, to sample key deeply uncertain future projections of sea-level rise, radiative forcing pathways, storm surge characterization, and contributions from rapid AIS mass loss. The implications of these deep uncertainties for projected flood risk are thus characterized by a set of 18 probability distribution functions. We use a global sensitivity analysis to assess which mechanisms contribute to uncertainty in projected flood risk over the course of a 50-year design life. In line with previous work, we find that the uncertain storm surge drives the most substantial risk, followed by general AIS dynamics, in our simple model for future flood risk for New Orleans.

  8. The analysis of financial risk management application for NPP project in Indonesia

    International Nuclear Information System (INIS)

    Imam Bastori; Moch Djoko Birmano

    2012-01-01

    NPP Project is one of full dynamic, risky and challenging business. Application of financial risk management t in Nuclear Power Plant (NPP) project becomes one alternative to be considered carefully. This paper explains an analysis to make a decision in the risk management application so that it can be applied in the NPP's construction in Indonesia. As case study, is NPP of conventional PWR type of class 1150 MWe. To calculate the economics and financing of NPP is used Spreadsheet INOVASI, further the decision of financial risk management were analyzed using a Model of Cash Flow Adjustment, which developed by Richard Fairchild. The analysis showed that the Method of Cash Flow Adjustment developed by Richard Fairchild is better than the method of NPV Adjustment on a NPP project, because it have included the aspects of financial risk management. NPP project can only be executed if the NPV 2 0 and decision to execute the financial risk management should be based on NPVrm > NPV. The application of financial risk management in NPP project is not needed if an insurance premium more expensive than all costs of financial distress, unless the insurance company can give discount of at least 20%. (author)

  9. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    Science.gov (United States)

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  10. Mathematical Modeling Projects: Success for All Students

    Science.gov (United States)

    Shelton, Therese

    2018-01-01

    Mathematical modeling allows flexibility for a project-based experience. We share details of our regular capstone course, successful for virtually 100% of our math majors for almost two decades. Our research-like approach in this course accommodates a variety of student backgrounds and interests, and has produced some award-winning student…

  11. International collaborative fire modeling project (ICFMP). Summary of benchmark

    International Nuclear Information System (INIS)

    Roewekamp, Marina; Klein-Hessling, Walter; Dreisbach, Jason; McGrattan, Kevin; Miles, Stewart; Plys, Martin; Riese, Olaf

    2008-09-01

    This document was developed in the frame of the 'International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications' (ICFMP). The objective of this collaborative project is to share the knowledge and resources of various organizations to evaluate and improve the state of the art of fire models for use in nuclear power plant fire safety, fire hazard analysis and fire risk assessment. The project is divided into two phases. The objective of the first phase is to evaluate the capabilities of current fire models for fire safety analysis in nuclear power plants. The second phase will extend the validation database of those models and implement beneficial improvements to the models that are identified in the first phase of ICFMP. In the first phase, more than 20 expert institutions from six countries were represented in the collaborative project. This Summary Report gives an overview on the results of the first phase of the international collaborative project. The main objective of the project was to evaluate the capability of fire models to analyze a variety of fire scenarios typical for nuclear power plants (NPP). The evaluation of the capability of fire models to analyze these scenarios was conducted through a series of in total five international Benchmark Exercises. Different types of models were used by the participating expert institutions from five countries. The technical information that will be useful for fire model users, developers and further experts is summarized in this document. More detailed information is provided in the corresponding technical reference documents for the ICFMP Benchmark Exercises No. 1 to 5. The objective of these exercises was not to compare the capabilities and strengths of specific models, address issues specific to a model, nor to recommend specific models over others. This document is not intended to provide guidance to users of fire models. Guidance on the use of fire models is currently being

  12. A software quality model and metrics for risk assessment

    Science.gov (United States)

    Hyatt, L.; Rosenberg, L.

    1996-01-01

    A software quality model and its associated attributes are defined and used as the model for the basis for a discussion on risk. Specific quality goals and attributes are selected based on their importance to a software development project and their ability to be quantified. Risks that can be determined by the model's metrics are identified. A core set of metrics relating to the software development process and its products is defined. Measurements for each metric and their usability and applicability are discussed.

  13. monIT: A Portuguese Risk Communication Project on EMF

    International Nuclear Information System (INIS)

    Oliveira, Carla; Sebastiao, Daniel; Carpinteiro, Goncalo; Fernandes, Carlos A.; Correia, Luis M.

    2006-01-01

    The monIT project is a risk communication programme, aiming at providing information on exposure to electromagnetic fields (EMF) from mobile communication systems in Portugal. monIT's website, www.lxlit.pt/monit, is the main interface for dissemination of information. Besides including relevant information about EMF for both the general public and the technical community, this website provides results from extensive measurement campaigns performed all over Portugal during the last three years. This paper presents the project's structure and activities, practical results achieved and ends with some conclusions and action lines for future work. (author)

  14. Quantile uncertainty and value-at-risk model risk.

    Science.gov (United States)

    Alexander, Carol; Sarabia, José María

    2012-08-01

    This article develops a methodology for quantifying model risk in quantile risk estimates. The application of quantile estimates to risk assessment has become common practice in many disciplines, including hydrology, climate change, statistical process control, insurance and actuarial science, and the uncertainty surrounding these estimates has long been recognized. Our work is particularly important in finance, where quantile estimates (called Value-at-Risk) have been the cornerstone of banking risk management since the mid 1980s. A recent amendment to the Basel II Accord recommends additional market risk capital to cover all sources of "model risk" in the estimation of these quantiles. We provide a novel and elegant framework whereby quantile estimates are adjusted for model risk, relative to a benchmark which represents the state of knowledge of the authority that is responsible for model risk. A simulation experiment in which the degree of model risk is controlled illustrates how to quantify Value-at-Risk model risk and compute the required regulatory capital add-on for banks. An empirical example based on real data shows how the methodology can be put into practice, using only two time series (daily Value-at-Risk and daily profit and loss) from a large bank. We conclude with a discussion of potential applications to nonfinancial risks. © 2012 Society for Risk Analysis.

  15. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  16. Spatiotemporal Modeling of Community Risk

    Science.gov (United States)

    2016-03-01

    Ertugay, and Sebnem Duzgun, “Exploratory and Inferential Methods for Spatio-Temporal Analysis of Residential Fire Clustering in Urban Areas,” Fire ...response in communities.”26 In “Exploratory and Inferential Methods for Spatio-temporal Analysis of Residential Fire Clustering in Urban Areas,” Ceyhan...of fire resources spread across the community. Spatiotemporal modeling shows that actualized risk is dynamic and relatively patterned. Though

  17. Risk analysis for construction and operation of gas pipeline projects in pakistan

    International Nuclear Information System (INIS)

    Mubin, S.; Mubin, G.

    2008-01-01

    In order to cater for its high energy demand, Pakistan is planning to import natural gas through pipelines from neighboring countries. For fully utilizing the imported gas, providing it to end customers, the infrastructure of gas pipeline needs to be developed. Therefore, huge investment has been done and proposed in this sector in coming future. Considering geological, topographical, geopolitical and climatic conditions of the country, there is added risk of earthquake, landslides and floods. Due to current geopolitical situation there is a persistent threat of unrest and terrorism in the country. Instable Government policies, high rate of inflation, rapid change in material prices are also important risk factors. All these factors make the situation very complex in quantifying the risk especially for a project in which the risk impact factor rises exponentially in case of risk occurrence. In this paper, most appropriate risk classification is made based on technological, organizational, political, natural climatic, security and environmental risk factors. Effort has been made to device a simpler risk management methodology to analyze and manage risks of gas pipeline project. In the proposed risk management model Monte Carlo simulation has been used to identify critical risks. (author)

  18. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie

    2014-01-01

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  19. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  20. Optimization of the cumulative risk assessment of pesticides and biocides using computational techniques: Pilot project

    DEFF Research Database (Denmark)

    Jonsdottir, Svava Osk; Reffstrup, Trine Klein; Petersen, Annette

    This pilot project is intended as the first step in developing a computational strategy to assist in refining methods for higher tier cumulative and aggregate risk assessment of exposure to mixture of pesticides and biocides. For this purpose, physiologically based toxicokinetic (PBTK) models were...

  1. Safeguards as catastrophic risk management: insights and projections

    International Nuclear Information System (INIS)

    Leffer, T.N.

    2013-01-01

    The system of international agreements designed to prevent the use of nuclear weapons and to control the spread of nuclear weapons, materials and technologies (collectively referred to as the nuclear arms control and nonproliferation regimes) is posited as humanity.s first attempt to mitigate a man-made global catastrophic risk. By extrapolating general principles of government response to risk from the arms control and nonproliferation regimes, a model of international regime building for catastrophic risk mitigation is constructed. This model provides the context for an examination of the system of safeguards implemented by the International Atomic Energy Agency (IAEA), which serves as the nuclear nonproliferation regime.s verification and enforcement mechanism and thereby constitutes the regime's most completely developed discrete mechanism for risk mitigation (a 'system within a system'). An assessment of the history, evolution and effectiveness of the IAEA safeguards system in the context of the regimes-as-risk-mitigation model reveals some general principles for risk-mitigation regimes which are then applied to the safeguards system to identify ways in which it may be strengthened. Finally, the IAEA safeguards system is posited as the prototype verification/enforcement mechanism for future risk mitigation regimes that governments will be compelled to create in the face of new global catastrophic risks that technological advance will inevitably create. (author)

  2. Analysis of uncertainty in modeling perceived risks

    International Nuclear Information System (INIS)

    Melnyk, R.; Sandquist, G.M.

    2005-01-01

    Expanding on a mathematical model developed for quantifying and assessing perceived risks, the distribution functions, variances, and uncertainties associated with estimating the model parameters are quantified. The analytical model permits the identification and assignment of any number of quantifiable risk perception factors that can be incorporated within standard risk methodology. Those risk perception factors associated with major technical issues are modeled using lognormal probability density functions to span the potentially large uncertainty variations associated with these risk perceptions. The model quantifies the logic of public risk perception and provides an effective means for measuring and responding to perceived risks. (authors)

  3. Development of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

    Science.gov (United States)

    Kim, Myung-Hee; Hu, Shaowen; Nounu, Hatem N.; Cucinotta, Francis A.

    2010-01-01

    The space radiation environment, particularly solar particle events (SPEs), poses the risk of acute radiation sickness (ARS) to humans; and organ doses from SPE exposure may reach critical levels during extra vehicular activities (EVAs) or within lightly shielded spacecraft. NASA has developed an organ dose projection model using the BRYNTRN with SUMDOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUMDOSE, written in FORTRAN, are a Baryon transport code and an output data processing code, respectively. The ARR code is written in C. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. BRYNTRN code operation requires extensive input preparation. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN in friendly way. A GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. The ARRBOD GUI will serve as a proof-of-concept example for future integration of other human space applications risk projection models. The current version of the ARRBOD GUI is a new self-contained product and will have follow-on versions, as options are added: 1) human geometries of MAX/FAX in addition to CAM/CAF; 2) shielding distributions for spacecraft, Mars surface and atmosphere; 3) various space environmental and biophysical models; and 4) other response models to be connected to the BRYNTRN. The major components of the overall system, the subsystem interconnections, and external interfaces are described in this

  4. Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

    Science.gov (United States)

    Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm

    2017-09-01

    The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

  5. Model risk analysis for risk management and option pricing

    NARCIS (Netherlands)

    Kerkhof, F.L.J.

    2003-01-01

    Due to the growing complexity of products in financial markets, market participants rely more and more on quantitative models for trading and risk management decisions. This introduces a fairly new type of risk, namely, model risk. In the first part of this thesis we investigate the quantitative

  6. Allocating risk capital for a brownfields redevelopment project under hydrogeological and financial uncertainty.

    Science.gov (United States)

    Yu, Soonyoung; Unger, Andre J A; Parker, Beth; Kim, Taehee

    2012-06-15

    In this study, we defined risk capital as the contingency fee or insurance premium that a brownfields redeveloper needs to set aside from the sale of each house in case they need to repurchase it at a later date because the indoor air has been detrimentally affected by subsurface contamination. The likelihood that indoor air concentrations will exceed a regulatory level subject to subsurface heterogeneity and source zone location uncertainty is simulated by a physics-based hydrogeological model using Monte Carlo realizations, yielding the probability of failure. The cost of failure is the future value of the house indexed to the stochastic US National Housing index. The risk capital is essentially the probability of failure times the cost of failure with a surcharge to compensate the developer against hydrogeological and financial uncertainty, with the surcharge acting as safety loading reflecting the developers' level of risk aversion. We review five methodologies taken from the actuarial and financial literature to price the risk capital for a highly stylized brownfield redevelopment project, with each method specifically adapted to accommodate our notion of the probability of failure. The objective of this paper is to develop an actuarially consistent approach for combining the hydrogeological and financial uncertainty into a contingency fee that the brownfields developer should reserve (i.e. the risk capital) in order to hedge their risk exposure during the project. Results indicate that the price of the risk capital is much more sensitive to hydrogeological rather than financial uncertainty. We use the Capital Asset Pricing Model to estimate the risk-adjusted discount rate to depreciate all costs to present value for the brownfield redevelopment project. A key outcome of this work is that the presentation of our risk capital valuation methodology is sufficiently generalized for application to a wide variety of engineering projects. Copyright © 2012 Elsevier

  7. RISK ANALYSIS FOR SHIP CONVERTING PROJECT ACCOMPLISHMENT (Case study of KRI KP Converting Project

    Directory of Open Access Journals (Sweden)

    Dimas Endro W

    2013-10-01

    Full Text Available Ship converting has become as prospective activity in ship building area. Operational and economical aspect are the most dominant rationale. Baseon a new fuction of converted ship, a task list which contain several jobs that must be done is listed. This accomplishment schedule not only contain a task list, but also duration for certain job title. In practical apllication job duration is maintained based on experience of project manager.  Further more, total accomplish duration is setted as time accomplishment for the project. This setted time has become reference for the project bid. Occasionaly, if accomplishment time which offered is strict, than schedule slip become as potencial nightmare. For this situation, project manager has had a cristal clearconsideration to select a proper decision wheter he will take the tender offer or not. practically, project mananger has layed on his experience to handle previous project and face  penalty if the project delayed. This paper focussed on how to measure tender offer based on risk analysis, specially for converted ship tender which has a strike time accomplishment.A new application method to analysis proposed tender based on time and penalty parameter has become a topic of this paper.

  8. RISK ASSESSMENT IN PROJECT PLANNING USING FMEA AND CRITICAL PATH METHOD

    Directory of Open Access Journals (Sweden)

    Sandra Milena CHOLES ARVILLA

    2014-10-01

    Full Text Available This paper is based upon the research undertaken for the development of the doctoral thesis “Management of software projects based on object-oriented technology”. The study examines the existing risk management practices commonly used for classic software development. The goal is to integrate the elements of the traditional risk management methodologies to create a new agile risk management methodology. The thesis focuses on techniques that can be easily implemented in extreme programming (XP and SCRUM. This study is motivated by the following research questions: What are the elements of existing quality assurance tools that could meet the principles of agile development? And is it possible to use risk estimation for improving quality in agile projects? The thesis presents a synthesis of the most common risk management techniques, as well as an introduction to agile methods XP and SCRUM. The proposal integrates the concepts of Failure Mode and Effect Analysis into the iterative life cycle of an agile software project. The thesis presents a metamodel which integrates the concepts of agile development methodologies: SCRUM and XP with the FMEA concepts for risk quantification. The model was partly implemented into a real development project. Partial results show the improvement in early identification of failures and allowed to reconsider the Sprint plan.

  9. Implementation of the model project: Ghanaian experience

    International Nuclear Information System (INIS)

    Schandorf, C.; Darko, E.O.; Yeboah, J.; Asiamah, S.D.

    2003-01-01

    Upgrading of the legal infrastructure has been the most time consuming and frustrating part of the implementation of the Model project due to the unstable system of governance and rule of law coupled with the low priority given to legislation on technical areas such as safe applications of Nuclear Science and Technology in medicine, industry, research and teaching. Dwindling Governmental financial support militated against physical and human resource infrastructure development and operational effectiveness. The trend over the last five years has been to strengthen the revenue generation base of the Radiation Protection Institute through good management practices to ensure a cost effective use of the limited available resources for a self-reliant and sustainable radiation and waste safety programme. The Ghanaian experience regarding the positive and negative aspects of the implementation of the Model Project is highlighted. (author)

  10. European project for a multinational macrosectoral model

    Energy Technology Data Exchange (ETDEWEB)

    d' Alcantara, G; Italianer, A

    1984-01-01

    This paper describes the HERMES project, a multinational macrosectoral European econometric modelling effort, sponsored by the Directorates General II (Economic and Financial Affairs), XII (Science, Research and Development), XVII (Energy) and the SOEC. The set-up of the model is sketched against the background of problems of growth, unemployment, inflation, trade balances, government balances and energy policy. Although the definitions of the variables and a complete specification of the model are given in the Appendix, the major features of the model are described extensively in the text. These include private and collective consumption (incl. a consumer demand system), the putty-clay production process, price and wage formation, sectoral bilateral trade flows and integrated energy economy modelling.

  11. North American Carbon Project (NACP) Regional Model-Model and Model-Data Intercomparison Project

    Science.gov (United States)

    Huntzinger, D. N.; Post, W. M.; Jacobson, A. R.; Cook, R. B.

    2009-05-01

    questions: 1. Do model results and observations show consistent spatial patterns in response to the 2002 drought? From measurements and model, can we infer what processes were affected by the 2002 drought? 2. What is the spatial pattern and magnitude of interannual variation in carbon sources and sinks? What are the components of carbon fluxes and pools that contribute to this variation? 3. What are the magnitudes and spatial distribution of carbon sources and sinks, and their uncertainties during the period 2000-2005? Examining and comparing results of inverse and forward model simulations with each other and with suitable benchmark spatial measurements help evaluate model strengths/weaknesses and utility, thereby providing multiple views of spatial and temporal patterns of fluxes, leading to better understandings of processes involved, and providing an improved basis for making projections.

  12. Future bloom and blossom frost risk for Malus domestica considering climate model and impact model uncertainties.

    Science.gov (United States)

    Hoffmann, Holger; Rath, Thomas

    2013-01-01

    The future bloom and risk of blossom frosts for Malus domestica were projected using regional climate realizations and phenological ( = impact) models. As climate impact projections are susceptible to uncertainties of climate and impact models and model concatenation, the significant horizon of the climate impact signal was analyzed by applying 7 impact models, including two new developments, on 13 climate realizations of the IPCC emission scenario A1B. Advancement of phenophases and a decrease in blossom frost risk for Lower Saxony (Germany) for early and late ripeners was determined by six out of seven phenological models. Single model/single grid point time series of bloom showed significant trends by 2021-2050 compared to 1971-2000, whereas the joint signal of all climate and impact models did not stabilize until 2043. Regarding blossom frost risk, joint projection variability exceeded the projected signal. Thus, blossom frost risk cannot be stated to be lower by the end of the 21st century despite a negative trend. As a consequence it is however unlikely to increase. Uncertainty of temperature, blooming date and blossom frost risk projection reached a minimum at 2078-2087. The projected phenophases advanced by 5.5 d K(-1), showing partial compensation of delayed fulfillment of the winter chill requirement and faster completion of the following forcing phase in spring. Finally, phenological model performance was improved by considering the length of day.

  13. Thresholding projection estimators in functional linear models

    OpenAIRE

    Cardot, Hervé; Johannes, Jan

    2010-01-01

    We consider the problem of estimating the regression function in functional linear regression models by proposing a new type of projection estimators which combine dimension reduction and thresholding. The introduction of a threshold rule allows to get consistency under broad assumptions as well as minimax rates of convergence under additional regularity hypotheses. We also consider the particular case of Sobolev spaces generated by the trigonometric basis which permits to get easily mean squ...

  14. Food for thought: Overconfidence in model projections

    DEFF Research Database (Denmark)

    Brander, Keith; Neuheimer, Anna; Andersen, Ken Haste

    2013-01-01

    There is considerable public and political interest in the state of marine ecosystems and fisheries, but the reliability of some recent projections has been called into question. New information about declining fish stocks, loss of biodiversity, climate impacts, and management failure is frequent...... be reliable and uncertainties arising from models and data shortcomings must be presented fully and transparently. Scientific journals play an important role and should require more detailed analysis and presentation of uncertainties....

  15. Managing a complex project using a risk-risk multiple domain matrix

    International Nuclear Information System (INIS)

    Pointurier, C.; Marle, F.; Jaber, H.

    2014-01-01

    This communication aims at presenting a clustering methodology applied to a complex project consisting of the delivery of three interdependent subsystems. This enables small and complementary task forces to be constituted, enhancing the communication and coordination on transverse issues related to the complexity of the whole system. The problem is to gather and exploit data for such systems, with numerous and heterogeneous risks of different domains (product, process, organization). The method consists in regrouping actors through the clustering of the risks they own. The result is a highlight on important and transverse risk interdependencies, within and between projects. These should not be neglected in order to avoid potential severe issues, whether during the project or during the exploitation of its deliverable. An application on a real program of plant implementation in the CEA-DAM is presented, with a sensitivity analysis of the clustering results to the inputs and chosen configurations of the problem. (authors)

  16. Models of Charity Donations and Project Funding in Social Networks

    Science.gov (United States)

    Wojciechowski, Adam

    One of the key fundaments of building a society is common interest or shared aims of the group members. This research work is a try to analyze web-based services oriented towards money collection for various social and charity projects. The phenomenon of social founding is worth a closer look at because its success strongly depends on the ability to build an ad-hoc or persistent groups of people sharing their believes and willing to support external institutions or individuals. The paper presents a review of money collection sites, various models of donation and money collection process as well as ways how the projects' results are reported to their founders. There is also a proposal of money collection service, where donators are not charged until total declared help overheads required resources to complete the project. The risk of missing real donations for declared payments, after the collection is closed, can be assessed and minimized by building a social network.

  17. Modeling Change in Project Duration and Completion

    DEFF Research Database (Denmark)

    Wiltshire, Travis; Butner, Jonathan E.; Pirtle, Zachary

    2017-01-01

    In complex work domains and organizations, understanding scheduleing dynamics can ensure objectives are reached and delays are mitigated. In the current paper, we examine the scheduling dynamics for NASA’s Exploration Flight Test 1 (EFT-1) activities. For this examination, we specifically modeled...... simultaneous change in percent complete and estimated duration for a given project as they were included in monthly reports over time. In short, we utilized latent change score mixture modeling to extract the attractor dynamics within the scheduling data. We found three primarily patterns: an attractor at low...

  18. Projections of Flood Risk using Credible Climate Signals in the Ohio River Basin

    Science.gov (United States)

    Schlef, K.; Robertson, A. W.; Brown, C.

    2017-12-01

    Estimating future hydrologic flood risk under non-stationary climate is a key challenge to the design of long-term water resources infrastructure and flood management strategies. In this work, we demonstrate how projections of large-scale climate patterns can be credibly used to create projections of long-term flood risk. Our study area is the northwest region of the Ohio River Basin in the United States Midwest. In the region, three major teleconnections have been previously demonstrated to affect synoptic patterns that influence extreme precipitation and streamflow: the El Nino Southern Oscillation, the Pacific North American pattern, and the Pacific Decadal Oscillation. These teleconnections are strongest during the winter season (January-March), which also experiences the greatest number of peak flow events. For this reason, flood events are defined as the maximum daily streamflow to occur in the winter season. For each gage in the region, the location parameter of a log Pearson type 3 distribution is conditioned on the first principal component of the three teleconnections to create a statistical model of flood events. Future projections of flood risk are created by forcing the statistical model with projections of the teleconnections from general circulation models selected for skill. We compare the results of our method to the results of two other methods: the traditional model chain (i.e., general circulation model projections to downscaling method to hydrologic model to flood frequency analysis) and that of using the historic trend. We also discuss the potential for developing credible projections of flood events for the continental United States.

  19. Credit Risk Evaluation : Modeling - Analysis - Management

    OpenAIRE

    Wehrspohn, Uwe

    2002-01-01

    An analysis and further development of the building blocks of modern credit risk management: -Definitions of default -Estimation of default probabilities -Exposures -Recovery Rates -Pricing -Concepts of portfolio dependence -Time horizons for risk calculations -Quantification of portfolio risk -Estimation of risk measures -Portfolio analysis and portfolio improvement -Evaluation and comparison of credit risk models -Analytic portfolio loss distributions The thesis contributes to the evaluatio...

  20. Overview of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

    Science.gov (United States)

    Kim, Myung-Hee Y.; Hu, Shaowen; Nounu, Hatem N.; Cucinotta, Francis A.

    2010-01-01

    Solar particle events (SPEs) pose the risk of acute radiation sickness (ARS) to astronauts, because organ doses from large SPEs may reach critical levels during extra vehicular activities (EVAs) or lightly shielded spacecraft. NASA has developed an organ dose projection model of Baryon transport code (BRYNTRN) with an output data processing module of SUMDOSE, and a probabilistic model of acute radiation risk (ARR). BRYNTRN code operation requires extensive input preparation, and the risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, these response models can be connected easily and correctly to BRYNTRN in a user friendly way. The GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. Assessment of astronauts organ doses and ARS from the exposure to historically large SPEs is in support of mission design and operation planning to avoid ARS and stay within the current NASA short-term dose limits. The ARRBOD GUI will serve as a proof-of-concept for future integration of other risk projection models for human space applications. We present an overview of the ARRBOD GUI product, which is a new self-contained product, for the major components of the overall system, subsystem interconnections, and external interfaces.

  1. The UK Earth System Model project

    Science.gov (United States)

    Tang, Yongming

    2016-04-01

    In this talk we will describe the development and current status of the UK Earth System Model (UKESM). This project is a NERC/Met Office collaboration and has two objectives; to develop and apply a world-leading Earth System Model, and to grow a community of UK Earth System Model scientists. We are building numerical models that include all the key components of the global climate system, and contain the important process interactions between global biogeochemistry, atmospheric chemistry and the physical climate system. UKESM will be used to make key CMIP6 simulations as well as long-time (e.g. millennium) simulations, large ensemble experiments and investigating a range of future carbon emission scenarios.

  2. "Flooding Risk Analysis and the Understanding of Hydrological Disturbance due to the Rapid Urbanization in a Low-Scale Subwatershed in Houston Area". ( The project develops a relavant Model of flooding risk assessment to define the connection between increased streamflow/flooding and the rapid urban land development).

    Science.gov (United States)

    Geldiyev, P.

    2017-12-01

    Rapid urban development and changing climate influences the frequency and magnitude of flooding in Houston area. This proposed project aims to evaluate the flooding risks with the current and future land use changes by 2040 for one subbasin of the San Jacinto Brazos/Neches-Trinity Coastal basin. Surface environments and streamflow data of the Clear Creek are analyzed and stimulated to discuss the possible impact of urbanization on the occurrence of floods. The streamflow data is analyzed and simulated with the application of the Geographic Information Systems and its extensions. Both hydrologic and hydraulic models of the Clear Creek are created with the use of HEC-HMS and HEC-RAS software. Both models are duplicated for the year 2040, based on projected 2040 Landcover Maps developed by Houston and Galveston Area Council. This project examines a type of contemporary hydrologic disturbance and the interaction between land cover and changes in hydrological processes. Expected results will be very significant for urban development and flooding management.

  3. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  4. NGNP Risk Management Database: A Model for Managing Risk

    International Nuclear Information System (INIS)

    Collins, John

    2009-01-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft(reg s ign) Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool's design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  5. NGNP Risk Management Database: A Model for Managing Risk

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  6. The Chancellor's Model School Project (CMSP)

    Science.gov (United States)

    Lopez, Gil

    1999-01-01

    What does it take to create and implement a 7th to 8th grade middle school program where the great majority of students achieve at high academic levels regardless of their previous elementary school backgrounds? This was the major question that guided the research and development of a 7-year long project effort entitled the Chancellor's Model School Project (CMSP) from September 1991 to August 1998. The CMSP effort conducted largely in two New York City public schools was aimed at creating and testing a prototype 7th and 8th grade model program that was organized and test-implemented in two distinct project phases: Phase I of the CMSP effort was conducted from 1991 to 1995 as a 7th to 8th grade extension of an existing K-6 elementary school, and Phase II was conducted from 1995 to 1998 as a 7th to 8th grade middle school program that became an integral part of a newly established 7-12th grade high school. In Phase I, the CMSP demonstrated that with a highly structured curriculum coupled with strong academic support and increased learning time, students participating in the CMSP were able to develop a strong foundation for rigorous high school coursework within the space of 2 years (at the 7th and 8th grades). Mathematics and Reading test score data during Phase I of the project, clearly indicated that significant academic gains were obtained by almost all students -- at both the high and low ends of the spectrum -- regardless of their previous academic performance in the K-6 elementary school experience. The CMSP effort expanded in Phase II to include a fully operating 7-12 high school model. Achievement gains at the 7th and 8th grade levels in Phase II were tempered by the fact that incoming 7th grade students' academic background at the CMSP High School was significantly lower than students participating in Phase 1. Student performance in Phase II was also affected by the broadening of the CMSP effort from a 7-8th grade program to a fully functioning 7-12 high

  7. Risk projection and the fertility of rural families.

    Science.gov (United States)

    Song, R

    1991-01-01

    The author comments on the theories and empirical evidence which aid in understanding the determinants of the reproductive behavior of farmers in China. The issues are defined, and discussion expands on the needs for a specific number of children in rural versus urban areas, M. Cain's risk insurance hypothesis, the importance of modes of production for the farm family, the farmer's security versus risks, and the balance between risk projection and the maximization of interest. The significance of risk projection is presented as are the implications for policy making. Neither theory of farmer's reproductive behavior, 1) the economic cost and benefit theory or 2) the need for labor theory is considered suitable. The idea that benefits exceed the costs of rearing children cannot justify the repeated cycle of poverty among farmers with many children. The Hubei Province, Danjiankou City, study which estimates rearing costs of 3360 yuan/child benefits of 305 yuan/year to the parents in old age is considered incorrect. The second theory agrees that children are needed for production but recognized surplus labor and does not account for the fact that the more children, the poorer the family. Micro demographic theories identify factors affecting demographic behavior, the extent to which factors affect fertility, and the interrelatedness of factors. The rural family feels jeopardized with one child, and the lowest tolerable number of children is 2-3 in rural areas. Manual labor is the basis of the traditional peasant economy. In this economy, loss of income is a threat whether due to crop failure, weather changes, or market changes. Payment occurs at the end of the year only. Child health is a risk due to poor nutrition and poor health facilities. Following a one-child policy might jeopardize perpetuation of the family line and provision for parents by sons. Urban risks are different. Rural families limit risk by keeping material resources, enlarging and strengthening the

  8. Environmental modeling and health risk analysis (ACTS/RISK)

    National Research Council Canada - National Science Library

    Aral, M. M

    2010-01-01

    ... presents a review of the topics of exposure and health risk analysis. The Analytical Contaminant Transport Analysis System (ACTS) and Health RISK Analysis (RISK) software tools are an integral part of the book and provide computational platforms for all the models discussed herein. The most recent versions of these two softwa...

  9. Acute Radiation Risk and BRYNTRN Organ Dose Projection Graphical User Interface

    Science.gov (United States)

    Cucinotta, Francis A.; Hu, Shaowen; Nounu, Hateni N.; Kim, Myung-Hee

    2011-01-01

    The integration of human space applications risk projection models of organ dose and acute radiation risk has been a key problem. NASA has developed an organ dose projection model using the BRYNTRN with SUM DOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUM DOSE are a Baryon transport code and an output data processing code, respectively. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN. A GUI for the ARR and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. BRYNTRN code operation requires extensive input preparation. Only a graphical user interface (GUI) can handle input and output for BRYNTRN to the response models easily and correctly. The purpose of the GUI development for ARRBOD is to provide seamless integration of input and output manipulations for the operations of projection modules (BRYNTRN, SLMDOSE, and the ARR probabilistic response model) in assessing the acute risk and the organ doses of significant Solar Particle Events (SPEs). The assessment of astronauts radiation risk from SPE is in support of mission design and operational planning to manage radiation risks in future space missions. The ARRBOD GUI can identify the proper shielding solutions using the gender-specific organ dose assessments in order to avoid ARR symptoms, and to stay within the current NASA short-term dose limits. The quantified evaluation of ARR severities based on any given shielding configuration and a specified EVA or other mission

  10. Statistical models for competing risk analysis

    International Nuclear Information System (INIS)

    Sather, H.N.

    1976-08-01

    Research results on three new models for potential applications in competing risks problems. One section covers the basic statistical relationships underlying the subsequent competing risks model development. Another discusses the problem of comparing cause-specific risk structure by competing risks theory in two homogeneous populations, P1 and P2. Weibull models which allow more generality than the Berkson and Elveback models are studied for the effect of time on the hazard function. The use of concomitant information for modeling single-risk survival is extended to the multiple failure mode domain of competing risks. The model used to illustrate the use of this methodology is a life table model which has constant hazards within pre-designated intervals of the time scale. Two parametric models for bivariate dependent competing risks, which provide interesting alternatives, are proposed and examined

  11. Project-matrix models of marketing organization

    Directory of Open Access Journals (Sweden)

    Gutić Dragutin

    2009-01-01

    Full Text Available Unlike theory and practice of corporation organization, in marketing organization numerous forms and contents at its disposal are not reached until this day. It can be well estimated that marketing organization today in most of our companies and in almost all its parts, noticeably gets behind corporation organization. Marketing managers have always been occupied by basic, narrow marketing activities as: sales growth, market analysis, market growth and market share, marketing research, introduction of new products, modification of products, promotion, distribution etc. They rarely found it necessary to focus a bit more to different aspects of marketing management, for example: marketing planning and marketing control, marketing organization and leading. This paper deals with aspects of project - matrix marketing organization management. Two-dimensional and more-dimensional models are presented. Among two-dimensional, these models are analyzed: Market management/products management model; Products management/management of product lifecycle phases on market model; Customers management/marketing functions management model; Demand management/marketing functions management model; Market positions management/marketing functions management model. .

  12. Risk matrix model for rotating equipment

    Directory of Open Access Journals (Sweden)

    Wassan Rano Khan

    2014-07-01

    Full Text Available Different industries have various residual risk levels for their rotating equipment. Accordingly the occurrence rate of the failures and associated failure consequences categories are different. Thus, a generalized risk matrix model is developed in this study which can fit various available risk matrix standards. This generalized risk matrix will be helpful to develop new risk matrix, to fit the required risk assessment scenario for rotating equipment. Power generation system was taken as case study. It was observed that eight subsystems were under risk. Only vibration monitor system was under high risk category, while remaining seven subsystems were under serious and medium risk categories.

  13. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  14. Financing offshore projects: The banker's approach to risk

    International Nuclear Information System (INIS)

    Beldam, R.A.

    1994-01-01

    The author has attempted to consider why companies chose to share risks with banks and looked in particular at the unique risk sharing aspect of project financing and how this may be reflected in the loan documentation. He also has considered the current market place and examined some trends for the future. The future challenge in the North Sea is going to be to use existing and new technology to reduce capital and operating costs, balanced with optimal recovery and safety. From a bank perspective, this type of work is extremely satisfying, if challenging, and the author has no doubt banks will continue to play their part in the future of offshore development wherever it occurs around the world

  15. Perceived risks in product innovation projects : development of a risk skeleton

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.; Song, X.M.

    1999-01-01

    The essence of undertaking a product innovation project is to create or establish something new. Risk taking is an intrinsic part of that process. In today's markets, with heavy competition, advanced technology and tough economic conditions, successful product innovation has become critically

  16. Source term modelling parameters for Project-90

    International Nuclear Information System (INIS)

    Shaw, W.; Smith, G.; Worgan, K.; Hodgkinson, D.; Andersson, K.

    1992-04-01

    This document summarises the input parameters for the source term modelling within Project-90. In the first place, the parameters relate to the CALIBRE near-field code which was developed for the Swedish Nuclear Power Inspectorate's (SKI) Project-90 reference repository safety assessment exercise. An attempt has been made to give best estimate values and, where appropriate, a range which is related to variations around base cases. It should be noted that the data sets contain amendments to those considered by KBS-3. In particular, a completely new set of inventory data has been incorporated. The information given here does not constitute a complete set of parameter values for all parts of the CALIBRE code. Rather, it gives the key parameter values which are used in the constituent models within CALIBRE and the associated studies. For example, the inventory data acts as an input to the calculation of the oxidant production rates, which influence the generation of a redox front. The same data is also an initial value data set for the radionuclide migration component of CALIBRE. Similarly, the geometrical parameters of the near-field are common to both sub-models. The principal common parameters are gathered here for ease of reference and avoidance of unnecessary duplication and transcription errors. (au)

  17. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  18. Modelling climate impact on floods under future emission scenarios using an ensemble of climate model projections

    Science.gov (United States)

    Wetterhall, F.; Cloke, H. L.; He, Y.; Freer, J.; Pappenberger, F.

    2012-04-01

    Evidence provided by modelled assessments of climate change impact on flooding is fundamental to water resource and flood risk decision making. Impact models usually rely on climate projections from Global and Regional Climate Models, and there is no doubt that these provide a useful assessment of future climate change. However, cascading ensembles of climate projections into impact models is not straightforward because of problems of coarse resolution in Global and Regional Climate Models (GCM/RCM) and the deficiencies in modelling high-intensity precipitation events. Thus decisions must be made on how to appropriately pre-process the meteorological variables from GCM/RCMs, such as selection of downscaling methods and application of Model Output Statistics (MOS). In this paper a grand ensemble of projections from several GCM/RCM are used to drive a hydrological model and analyse the resulting future flood projections for the Upper Severn, UK. The impact and implications of applying MOS techniques to precipitation as well as hydrological model parameter uncertainty is taken into account. The resultant grand ensemble of future river discharge projections from the RCM/GCM-hydrological model chain is evaluated against a response surface technique combined with a perturbed physics experiment creating a probabilisic ensemble climate model outputs. The ensemble distribution of results show that future risk of flooding in the Upper Severn increases compared to present conditions, however, the study highlights that the uncertainties are large and that strong assumptions were made in using Model Output Statistics to produce the estimates of future discharge. The importance of analysing on a seasonal basis rather than just annual is highlighted. The inability of the RCMs (and GCMs) to produce realistic precipitation patterns, even in present conditions, is a major caveat of local climate impact studies on flooding, and this should be a focus for future development.

  19. Building information models for astronomy projects

    Science.gov (United States)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  20. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  1. A combined AHP-GP model to allocate internal auditing time to projects

    Directory of Open Access Journals (Sweden)

    HA Kruger

    2006-06-01

    Full Text Available The optimal allocation of internal auditing time among competing projects is a multi-criteria problem that includes both qualitative and quantitative factors. This paper discusses an integrated approach where the analytic hierarchy process (AHP is used to deal with qualitative risk assessments and a goal programming (GP model to distribute available hours in such a way that risk is minimised. Additional considerations, such as maximum and minimum allowable project hours, risk reducing factors and risk levels, are also taken into account. Following a description of the models and framework, a brief case study is presented in which the framework was empirically evaluated.

  2. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  3. Risk management

    OpenAIRE

    Mcmanus, John

    2009-01-01

    Few projects are completed on time, on budget, and to their original requirement or specifications. Focusing on what project managers need to know about risk in the pursuit of delivering projects, Risk Management covers key components of the risk management process and the software development process, as well as best practices for risk identification, risk planning, and risk analysis. The book examines risk planning, risk analysis responses to risk, the tracking and modelling of risks, intel...

  4. Models for assessing and managing credit risk

    Directory of Open Access Journals (Sweden)

    Neogradi Slađana

    2014-01-01

    Full Text Available This essay deals with the definition of a model for assessing and managing credit risk. Risk is an inseparable component of any average and normal credit transaction. Looking at the different aspects of the identification and classification of risk in the banking industry as well as representation of the key components of modern risk management. In the first part of the essay will analyze how the impact of credit risk on bank and empirical models for determining the financial difficulties in which the company can be found. Bank on the basis of these models can reduce number of approved risk assets. In the second part, we consider models for improving credit risk with emphasis on Basel I, II and III, and the third part, we conclude that the most appropriate model and gives the best effect for measuring credit risk in domestic banks.

  5. The Impact of Tax Shocks and Oil Price Volatility on Risk - A Study of North Sea Oilfield Projects

    OpenAIRE

    Kretzschmar, Gavin Lee; Moles, Peter

    2006-01-01

    We examine the impact of market volatility and increased fiscal take on risk in strategic natural resource projects. An increase in 2006 UK oilfield taxation is used as a natural experiment for assessing the impact of a fiscal increase on oilfield projects comprising 73% of UK reserves. Stochastic cash flow at risk models combine market volatility and tax-take at the oilfield level to extend earlier North Sea studies. We demonstrate that a 10% Secondary tax increase in a composite UKCS fiscal...

  6. From field studies to risk management: the Sensib project

    International Nuclear Information System (INIS)

    Mercat-Rommens, C.; Renaud, P.

    2004-01-01

    The consequences for the man and the environment of the discharges of nuclear facilities depend on the importance and the nature of the discharges, but also on the environment which receives them. Thus, the impact of a pollution, which is expressed in term of toxicity, risk or economic consequences, varies according to the characteristics of the environment and the use of this environment by the man. The radioecological sensitivity can be defined as the response of the environment to a radioactive pollution. This response is expressed through various indicators: the activity of a radionuclide at a precise moment, a stock of radionuclide in a given environmental compartment or a flux of radionuclide... For a determined discharge, the higher is the response, the more sensitive is the environment. If all the ecosystems appear sensitive, their sensitivity does not concern the same criteria and it is currently difficult to compare these criteria between them; is it more hazardous to have a stock of radioactivity present in a natural space or to have an important but time-limited concentration of radionuclides in a river used for irrigation? The idea of the SENSIB project is to create a standardized tool which makes it possible to represent and to compare with the same scale the sensitivity of various ecosystems. The sensitivity indexes, which will be developed during the project, aim to represent the intensity of the environmental response. These indicators, which are the result of the transfer of the radionuclides in the environment, depend on various intrinsic parameters of the ecosystems (climate, soil, agricultural practises...). The SENSIB project, based on results of field studies conducted by IRSN, aims to develop both a methodology to calculate sensitivity indexes and a radioecological sensitivity scale usable for risk management. (author)

  7. RISK LOAN PORTFOLIO OPTIMIZATION MODEL BASED ON CVAR RISK MEASURE

    Directory of Open Access Journals (Sweden)

    Ming-Chang LEE

    2015-07-01

    Full Text Available In order to achieve commercial banks liquidity, safety and profitability objective requirements, loan portfolio risk analysis based optimization decisions are rational allocation of assets.  The risk analysis and asset allocation are the key technology of banking and risk management.  The aim of this paper, build a loan portfolio optimization model based on risk analysis.  Loan portfolio rate of return by using Value-at-Risk (VaR and Conditional Value-at-Risk (CVaR constraint optimization decision model reflects the bank's risk tolerance, and the potential loss of direct control of the bank.  In this paper, it analyze a general risk management model applied to portfolio problems with VaR and CVaR risk measures by using Using the Lagrangian Algorithm.  This paper solves the highly difficult problem by matrix operation method.  Therefore, the combination of this paper is easy understanding the portfolio problems with VaR and CVaR risk model is a hyperbola in mean-standard deviation space.  It is easy calculation in proposed method.

  8. Estimating radiation-induced cancer risk using MVK two-stage model for carcinogenesis

    International Nuclear Information System (INIS)

    Kai, M.; Kusama, T.; Aoki, Y.

    1993-01-01

    Based on the carcinogenesis model as proposed by Moolgavkar et al., time-dependent relative risk models were derived for projecting the time variation in excess relative risk. If it is assumed that each process is described by time-independent linear dose-response relationship, the time variation in excess relative risk is influenced by the parameter related with the promotion process. The risk model based carcinogenesis theory would play a marked role in estimating radiation-induced cancer risk in constructing a projection model or transfer model

  9. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  10. Sexual HIV Risk Among Male Parolees and Their Female Partners: The Relate Project.

    Science.gov (United States)

    Comfort, Megan; Reznick, Olga Grinstead; Dilworth, Samantha E; Binson, Diane; Darbes, Lynae A; Neilands, Torsten B

    The massively disproportionate impact of America's prison boom on communities of color has raised questions about how incarceration may affect health disparities, including disparities in HIV. Primary partners are an important source of influence on sexual health. In this paper, we investigate sexual HIV risk among male-female couples following a man's release from prison. We draw upon data from the Relate Project, a novel cross-sectional survey of recently released men and their female partners in Oakland and San Francisco, California (N=344). Inferential analyses use the actor-partner model to explore actor and partner effects on sexual HIV risk outcomes. Dyadic analyses of sexual HIV risk among male parolees and their female partners paint a complex portrait of couples affected by incarceration and of partners' influences on each other. Findings indicate that demographic factors such as education level and employment status, individual psycho-social factors such as perception of risk, and relationship factors such as commitment and power affect sexual HIV risk outcomes. The Relate Project provides a novel dataset for the dyadic analysis of sexual risk among male parolees and their female partners, and results highlight the importance of focusing on the couple as a unit when assessing HIV risk and protective behaviors. Results also indicate potentially fruitful avenues for population-specific interventions that may help to reduce sexual health disparities among couples affected by incarceration.

  11. Handbook for Volcanic Risk Management: an outcome from MIAVITA project

    Science.gov (United States)

    Bignami, Christian; Bosi, Vittorio; Costantini, Licia; Cristiani, Chiara; Lavigne, Franck; Thierry, Pierre

    2013-04-01

    Volcanic eruptions are one of the most impressive, violent and dramatic agents of change on Earth, threatening hundreds of millions of people. The crises management implies a strong cooperation among the main stakeholders (e.g., civil protection authorities, scientific institutions, operational forces). Considering the great amount of different actions required during the whole volcanic cycle (e.g., preparedness, unrest phase, crisis management, resilience), the role and responsibilities of stakeholders should be clarified in advance. In particular, the role of scientists, fundamental in all the phases, should be well discussed with the other stakeholders and well defined, for every country. This will allow a better management and response, and contribute to avoid misunderstanding. The new "Handbook for Volcanic Risk Management" issued by the MIAVITA European project, funded by the European Commission (Mitigate and Assess risk from Volcanic Impact on Terrain and human Activities) gives a contribution to that. Indeed, this handbook aims at synthesizing the acquired knowledge on volcanic risk management, such as prevention, preparedness, mitigation, intervention, crisis management and resilience, in a practical and useful way. It promotes the creation of an ideal bridge between different actors involved in risk management, improving and facilitating interactions among authorities and scientists. This work is based on current scientific research and the shared experience of the different MIAVITA project partners as well as on international good practices previously recommended. The handbook is composed of six sections. The first one briefly explains the global volcanic context and the principles of corresponding risk management. Section 2 contains a description of volcanic phenomena, damage and understanding size and effects that can be expected. Sections 3, 4 and 5 meet preparation and prevention issues and describe actions to be undertaken during the response phase

  12. Risks Associated with Unconventional Gas Extraction Projects. Induced Seismicity, NORM and Ecological Risks

    International Nuclear Information System (INIS)

    Rodrigo-Naharro, J.; Hurtado, A.; Eguilior, S.; Recreo, F.

    2015-01-01

    The latest technological advances in hydraulic fracturing (fracking) and horizontal drilling are globally driving the commercial extraction of unconventional resources. Although there is still no commercial exploitation of these resources within the EU, the fact that there are potential reserves in some countries, such as Spain, stimulates the need of performing preliminary studies to define the characteristics that an unconventional gas extraction project should consider. The object of these features are the safety of the project, thus minimizing the probabilities of negative environmental impacts, and especially since there is not any EU Framework Directive focusing on the regulation of the operation of such fossil fuels. A project of this nature, involving natural systems, must start from the knowledge of these systems and from an assessment of its features in order to reach the environmental safety of the operations. Moreover, the implementation of risk management systems, along with the existence of an appropriate legislation and supervision are key elements in the development of unconventional gas extraction projects that are environmentally friendly. The present report includes, among the overall risks associated with such projects, those related to: i) the induced seismicity; ii) the Naturally-Occurring Radioactive Materials (NORM); and iii) the ecology.

  13. Risk management in the project of implantation of the repository for low and intermediate level radioactive waste

    International Nuclear Information System (INIS)

    Borssatto, Maria de Fatima B.; Tello, Cledola Cassia O. de; Uemura, George

    2011-01-01

    Project RBMN is part of the Brazilian solution for the storage of radioactive waste generated by the activities of nuclear energy in Brazil. The aim of RBMN is to implement the National Repository to dispose the low and intermediate-level radioactive waste. Risk is a characteristic of all projects, and it is originated from uncertainties, assumptions and the environment of execution of the project. Risk management is the way to monitor systematically these uncertainties and a guaranty that the goals of the project will be attained. A specific methodology for the risk management of the Project RBMN is under development, which integrates models and processes for identification and analysis of risks, reactions, monitoring, control and planning of risk management. This methodology is fundamental and will be of primordial importance for future generations who will be responsible for the operation at final stages, closure and institutional control during the post-closure of the repository. It will provide greater safety to executed processes and safeguarding risks and specific solutions for this enterprise, guaranteeing the safety of the repository in its life cycle, which has a foreseen duration of at least three hundred years. The aim of this paper is to present the preliminary analysis of the opportunities, threats, strong points and weak points identified up to now, that will provide support to implement risk management procedures. The methodology will be based on the PMBOK R - Project Management Board of Knowledge - and will take into consideration the best practices for project management.(author)

  14. A Corrosion Risk Assessment Model for Underground Piping

    Science.gov (United States)

    Datta, Koushik; Fraser, Douglas R.

    2009-01-01

    The Pressure Systems Manager at NASA Ames Research Center (ARC) has embarked on a project to collect data and develop risk assessment models to support risk-informed decision making regarding future inspections of underground pipes at ARC. This paper shows progress in one area of this project - a corrosion risk assessment model for the underground high-pressure air distribution piping system at ARC. It consists of a Corrosion Model of pipe-segments, a Pipe Wrap Protection Model; and a Pipe Stress Model for a pipe segment. A Monte Carlo simulation of the combined models provides a distribution of the failure probabilities. Sensitivity study results show that the model uncertainty, or lack of knowledge, is the dominant contributor to the calculated unreliability of the underground piping system. As a result, the Pressure Systems Manager may consider investing resources specifically focused on reducing these uncertainties. Future work includes completing the data collection effort for the existing ground based pressure systems and applying the risk models to risk-based inspection strategies of the underground pipes at ARC.

  15. Project Investment and Project Financing: A study on Business Case and Financing Models

    OpenAIRE

    Wang, Simiao

    2012-01-01

    Uncertainty is a very significant factor that must be taken into consideration in project front-end phase management. By taking into uncertainty, the planners can to a great extent make sure that the business case could be accurate between specific intervals, hence business case can be based on to make decision. In a highly uncertain environment; the project sponsors should prefer other means to finance the project rather than using debt. Risk management is extremely important in project fina...

  16. The sigma model on complex projective superspaces

    Energy Technology Data Exchange (ETDEWEB)

    Candu, Constantin; Mitev, Vladimir; Schomerus, Volker [DESY, Hamburg (Germany). Theory Group; Quella, Thomas [Amsterdam Univ. (Netherlands). Inst. for Theoretical Physics; Saleur, Hubert [CEA Saclay, 91 - Gif-sur-Yvette (France). Inst. de Physique Theorique; USC, Los Angeles, CA (United States). Physics Dept.

    2009-08-15

    The sigma model on projective superspaces CP{sup S-1} {sup vertical} {sup stroke} {sup S} gives rise to a continuous family of interacting 2D conformal field theories which are parametrized by the curvature radius R and the theta angle {theta}. Our main goal is to determine the spectrum of the model, non-perturbatively as a function of both parameters. We succeed to do so for all open boundary conditions preserving the full global symmetry of the model. In string theory parlor, these correspond to volume filling branes that are equipped with a monopole line bundle and connection. The paper consists of two parts. In the first part, we approach the problem within the continuum formulation. Combining combinatorial arguments with perturbative studies and some simple free field calculations, we determine a closed formula for the partition function of the theory. This is then tested numerically in the second part. There we propose a spin chain regularization of the CP{sup S-1} {sup vertical} {sup stroke} {sup S} model with open boundary conditions and use it to determine the spectrum at the conformal fixed point. The numerical results are in remarkable agreement with the continuum analysis. (orig.)

  17. The sigma model on complex projective superspaces

    International Nuclear Information System (INIS)

    Candu, Constantin; Mitev, Vladimir; Schomerus, Volker; Quella, Thomas; Saleur, Hubert; USC, Los Angeles, CA

    2009-08-01

    The sigma model on projective superspaces CP S-1 vertical stroke S gives rise to a continuous family of interacting 2D conformal field theories which are parametrized by the curvature radius R and the theta angle θ. Our main goal is to determine the spectrum of the model, non-perturbatively as a function of both parameters. We succeed to do so for all open boundary conditions preserving the full global symmetry of the model. In string theory parlor, these correspond to volume filling branes that are equipped with a monopole line bundle and connection. The paper consists of two parts. In the first part, we approach the problem within the continuum formulation. Combining combinatorial arguments with perturbative studies and some simple free field calculations, we determine a closed formula for the partition function of the theory. This is then tested numerically in the second part. There we propose a spin chain regularization of the CP S-1 vertical stroke S model with open boundary conditions and use it to determine the spectrum at the conformal fixed point. The numerical results are in remarkable agreement with the continuum analysis. (orig.)

  18. Shell’s use of science in de-risking projects

    CSIR Research Space (South Africa)

    Rossouw, N

    2017-10-01

    Full Text Available This presentation discusses Shell’s use of science in de-risking projects. The presentation includes examples of applying science in the De-Risking process, supporting scientific research and De-Risking the Karoo Basin....

  19. Task-based dermal exposure models for regulatory risk assessment

    NARCIS (Netherlands)

    Warren, N.D.; Marquart, H.; Christopher, Y.; Laitinen, J.; Hemmen, J.J. van

    2006-01-01

    The regulatory risk assessment of chemicals requires the estimation of occupational dermal exposure. Until recently, the models used were either based on limited data or were specific to a particular class of chemical or application. The EU project RISKOFDERM has gathered a considerable number of

  20. NASA Space Radiation Program Integrative Risk Model Toolkit

    Science.gov (United States)

    Kim, Myung-Hee Y.; Hu, Shaowen; Plante, Ianik; Ponomarev, Artem L.; Sandridge, Chris

    2015-01-01

    NASA Space Radiation Program Element scientists have been actively involved in development of an integrative risk models toolkit that includes models for acute radiation risk and organ dose projection (ARRBOD), NASA space radiation cancer risk projection (NSCR), hemocyte dose estimation (HemoDose), GCR event-based risk model code (GERMcode), and relativistic ion tracks (RITRACKS), NASA radiation track image (NASARTI), and the On-Line Tool for the Assessment of Radiation in Space (OLTARIS). This session will introduce the components of the risk toolkit with opportunity for hands on demonstrations. The brief descriptions of each tools are: ARRBOD for Organ dose projection and acute radiation risk calculation from exposure to solar particle event; NSCR for Projection of cancer risk from exposure to space radiation; HemoDose for retrospective dose estimation by using multi-type blood cell counts; GERMcode for basic physical and biophysical properties for an ion beam, and biophysical and radiobiological properties for a beam transport to the target in the NASA Space Radiation Laboratory beam line; RITRACKS for simulation of heavy ion and delta-ray track structure, radiation chemistry, DNA structure and DNA damage at the molecular scale; NASARTI for modeling of the effects of space radiation on human cells and tissue by incorporating a physical model of tracks, cell nucleus, and DNA damage foci with image segmentation for the automated count; and OLTARIS, an integrated tool set utilizing HZETRN (High Charge and Energy Transport) intended to help scientists and engineers study the effects of space radiation on shielding materials, electronics, and biological systems.

  1. MODELING CREDIT RISK THROUGH CREDIT SCORING

    OpenAIRE

    Adrian Cantemir CALIN; Oana Cristina POPOVICI

    2014-01-01

    Credit risk governs all financial transactions and it is defined as the risk of suffering a loss due to certain shifts in the credit quality of a counterpart. Credit risk literature gravitates around two main modeling approaches: the structural approach and the reduced form approach. In addition to these perspectives, credit risk assessment has been conducted through a series of techniques such as credit scoring models, which form the traditional approach. This paper examines the evolution of...

  2. A Model of Project and Organisational Dynamics

    OpenAIRE

    Jenny Leonard

    2012-01-01

    The strategic, transformational nature of many information systems projects is now widely understood. Large-scale implementations of systems are known to require significant management of organisational change in order to be successful. Moreover, projects are rarely executed in isolation – most organisations have a large programme of projects being implemented at any one time. However, project and value management methodologies provide ad hoc definitions of the relationship between a project ...

  3. A comparison of models for risk assessment

    International Nuclear Information System (INIS)

    Kellerer, A.M.; Jing Chen

    1993-01-01

    Various mathematical models have been used to represent the dependence of excess cancer risk on dose, age and time since exposure. For solid cancers, i.e. all cancers except leukaemia, the so-called relative risk model is usually employed. However, there can be quite different relative risk models. The most usual model for the quantification of excess tumour rate among the atomic bomb survivors has been a dependence of the relative risk on age at exposure, but it has been shown recently that an age attained model can be equally applied, to represent the observations among the atomic bomb survivors. The differences between the models and their implications are explained. It is also shown that the age attained model is similar to the approaches that have been used in the analysis of lung cancer incidence among radon exposed miners. A more unified approach to modelling of radiation risks can thus be achieved. (3 figs.)

  4. MODEL OF INTEGRATED VALUE OF PROJECTS IN THE FIELD OF ALTERNATIVE ENERGY

    Directory of Open Access Journals (Sweden)

    Наталія Ігорівна БОРИСОВА

    2015-05-01

    Full Text Available Development of alternative energy sources requires the implementation of complex problems, the solution of which is necessary to apply the project approach. The uniqueness of alternative energy projects (AEP necessitates individual approach to evaluating the effectiveness of each. The paper contains the results of the project management features's analysis in the field of alternative energy, determining the values and developing of the value management integrated conceptual model of AEP. In assessing the effectiveness of AEP considered the socio-economic and commercial aspects. Value management integrated conceptual model of AEP was obtained by combining the classical model of the project management goals with the project values model "Five "E" and two "A". The classical model of the project management goals have been complemented with risk parameters.

  5. Competing Risks and Multistate Models with R

    CERN Document Server

    Beyersmann, Jan; Schumacher, Martin

    2012-01-01

    This book covers competing risks and multistate models, sometimes summarized as event history analysis. These models generalize the analysis of time to a single event (survival analysis) to analysing the timing of distinct terminal events (competing risks) and possible intermediate events (multistate models). Both R and multistate methods are promoted with a focus on nonparametric methods.

  6. Solid Waste Projection Model: Database User's Guide

    International Nuclear Information System (INIS)

    Blackburn, C.L.

    1993-10-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC) specifically to address Hanford solid waste management issues. This document is one of a set of documents supporting the SWPM system and providing instructions in the use and maintenance of SWPM components. This manual contains instructions for using Version 1.4 of the SWPM database: system requirements and preparation, entering and maintaining data, and performing routine database functions. This document supports only those operations which are specific to SWPM database menus and functions and does not Provide instruction in the use of Paradox, the database management system in which the SWPM database is established

  7. Projecting surgeon supply using a dynamic model.

    Science.gov (United States)

    Fraher, Erin P; Knapton, Andy; Sheldon, George F; Meyer, Anthony; Ricketts, Thomas C

    2013-05-01

    To develop a projection model to forecast the head count and full-time equivalent supply of surgeons by age, sex, and specialty in the United States from 2009 to 2028. The search for the optimal number and specialty mix of surgeons to care for the United States population has taken on increased urgency under health care reform. Expanded insurance coverage and an aging population will increase demand for surgical and other medical services. Accurate forecasts of surgical service capacity are crucial to inform the federal government, training institutions, professional associations, and others charged with improving access to health care. The study uses a dynamic stock and flow model that simulates future changes in numbers and specialty type by factoring in changes in surgeon demographics and policy factors. : Forecasts show that overall surgeon supply will decrease 18% during the period form 2009 to 2028 with declines in all specialties except colorectal, pediatric, neurological surgery, and vascular surgery. Model simulations suggest that none of the proposed changes to increase graduate medical education currently under consideration will be sufficient to offset declines. The length of time it takes to train surgeons, the anticipated decrease in hours worked by surgeons in younger generations, and the potential decreases in graduate medical education funding suggest that there may be an insufficient surgeon workforce to meet population needs. Existing maldistribution patterns are likely to be exacerbated, leading to delayed or lost access to time-sensitive surgical procedures, particularly in rural areas.

  8. Health risk assessment for a MWC ash utilization demonstration project

    International Nuclear Information System (INIS)

    Roffman, H.K.

    1992-01-01

    A Health Risk Assessment (HRA) was conducted for the proposed joint Hennepin County/Municipal Services Corporation (MSC) MSW Ash Utilization Demonstration Project, in which combined HERC ash was shipped to the MSC Pilot Plan near Atlanta, Georgia and used in the production of a synthetic aggregate. The synthetic aggregate, or TAP, will serve as a partial replacement for natural aggregates in a section of bituminous pavement that is proposed to be constructed on Pioneer Trail in the City of Corcoran, Minnesota. In this paper, the assessment compares the following three scenarios: a section of roadway paved using the MSC synthetic aggregate product (TAP) as a replacement for 30 percent of the natural aggregates used in bituminous pavement; a section of regular bituminous (asphalt) pavement; and a section of unpaved road currently in place at the site

  9. Risk Modelling for Passages in Approach Channel

    Directory of Open Access Journals (Sweden)

    Leszek Smolarek

    2013-01-01

    Full Text Available Methods of multivariate statistics, stochastic processes, and simulation methods are used to identify and assess the risk measures. This paper presents the use of generalized linear models and Markov models to study risks to ships along the approach channel. These models combined with simulation testing are used to determine the time required for continuous monitoring of endangered objects or period at which the level of risk should be verified.

  10. Modeling for operational event risk assessment

    International Nuclear Information System (INIS)

    Sattison, M.B.

    1997-01-01

    The U.S. Nuclear Regulatory Commission has been using risk models to evaluate the risk significance of operational events in U.S. commercial nuclear power plants for more seventeen years. During that time, the models have evolved in response to the advances in risk assessment technology and insights gained with experience. Evaluation techniques fall into two categories, initiating event assessments and condition assessments. The models used for these analyses have become uniquely specialized for just this purpose

  11. Decision making and risk analysis during the development of wind energy projects

    International Nuclear Information System (INIS)

    Vanhaesebroeck, M.

    2004-11-01

    This study aims at determining a methodology or criteria which can be used as decision making tools for the development of wind power projects and for the objective profitability comparison between several projects. In the first part, the different steps of the development of a wind power project in France are described. For each step, the cost of the studies, the related approaches and the main risks of abandonment are precised. The potential time drifts in the planning of the project are identified on the basis of the experience feedback of the first years of wind power development in France. In the second part, the possibilities of using classical investment choice techniques are analyzed. The characteristics having more impact on the project profitability are identified. In the third part, the sequential models with increasing information are used to evaluate a project, whatever its level of development. Finally, a concrete case is considered to see how these models can be used as decision making tools during key steps of wind farms development. (J.S.)

  12. MATHEMATICAL RISK ANALYSIS: VIA NICHOLAS RISK MODEL AND BAYESIAN ANALYSIS

    Directory of Open Access Journals (Sweden)

    Anass BAYAGA

    2010-07-01

    Full Text Available The objective of this second part of a two-phased study was to explorethe predictive power of quantitative risk analysis (QRA method andprocess within Higher Education Institution (HEI. The method and process investigated the use impact analysis via Nicholas risk model and Bayesian analysis, with a sample of hundred (100 risk analysts in a historically black South African University in the greater Eastern Cape Province.The first findings supported and confirmed previous literature (KingIII report, 2009: Nicholas and Steyn, 2008: Stoney, 2007: COSA, 2004 that there was a direct relationship between risk factor, its likelihood and impact, certiris paribus. The second finding in relation to either controlling the likelihood or the impact of occurrence of risk (Nicholas risk model was that to have a brighter risk reward, it was important to control the likelihood ofoccurrence of risks as compared with its impact so to have a direct effect on entire University. On the Bayesian analysis, thus third finding, the impact of risk should be predicted along three aspects. These aspects included the human impact (decisions made, the property impact (students and infrastructural based and the business impact. Lastly, the study revealed that although in most business cases, where as business cycles considerably vary dependingon the industry and or the institution, this study revealed that, most impacts in HEI (University was within the period of one academic.The recommendation was that application of quantitative risk analysisshould be related to current legislative framework that affects HEI.

  13. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    Energy Technology Data Exchange (ETDEWEB)

    Sathaye, Jayant; Dale, Larry; Larsen, Peter; Fitts, Gary; Koy, Kevin; Lewis, Sarah; Lucena, Andre

    2011-06-22

    This report outlines the results of a study of the impact of climate change on the energy infrastructure of California and the San Francisco Bay region, including impacts on power plant generation; transmission line and substation capacity during heat spells; wildfires near transmission lines; sea level encroachment upon power plants, substations, and natural gas facilities; and peak electrical demand. Some end-of-century impacts were projected:Expected warming will decrease gas-fired generator efficiency. The maximum statewide coincident loss is projected at 10.3 gigawatts (with current power plant infrastructure and population), an increase of 6.2 percent over current temperature-induced losses. By the end of the century, electricity demand for almost all summer days is expected to exceed the current ninetieth percentile per-capita peak load. As much as 21 percent growth is expected in ninetieth percentile peak demand (per-capita, exclusive of population growth). When generator losses are included in the demand, the ninetieth percentile peaks may increase up to 25 percent. As the climate warms, California's peak supply capacity will need to grow faster than the population.Substation capacity is projected to decrease an average of 2.7 percent. A 5C (9F) air temperature increase (the average increase predicted for hot days in August) will diminish the capacity of a fully-loaded transmission line by an average of 7.5 percent.The potential exposure of transmission lines to wildfire is expected to increase with time. We have identified some lines whose probability of exposure to fire are expected to increase by as much as 40 percent. Up to 25 coastal power plants and 86 substations are at risk of flooding (or partial flooding) due to sea level rise.

  14. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  15. Noxious facility impact projection: Incorporating the effects of risk aversion

    International Nuclear Information System (INIS)

    Nieves, L.A.

    1993-01-01

    Developing new sites for noxious facilities has become a complex process with many potential pitfalls. In addition to the need to negotiate conditions acceptable to the host community, siting success may depend on the facility proposer's ability to identify a candidate site that not only meets technical requirements, but that is located in a community or region whose population is not highly averse to the risks associated with the type of facility being proposed. Success may also depend on the proposer accurately assessing potential impacts of the facility and offering an equitable compensation package to the people affected by it. Facility impact assessments, as typically performed, include only the effects of changes in population, employment and economic activity associated with facility construction and operation. Because of their scope, such assessments usually show a short-run, net economic benefit for the host region, making the intensely negative public reaction to some types and locations of facilities seem unreasonable. The impact component excluded from these assessments is the long-run economic effect of public perceptions of facility risk and nuisance characteristics. Recent developments in psychological and economic measurement techniques have opened the possibility of correcting this flaw by incorporating public perceptions in projections of economic impacts from noxious facilities

  16. Logistics of Mathematical Modeling-Focused Projects

    Science.gov (United States)

    Harwood, R. Corban

    2018-01-01

    This article addresses the logistics of implementing projects in an undergraduate mathematics class and is intended both for new instructors and for instructors who have had negative experiences implementing projects in the past. Project implementation is given for both lower- and upper-division mathematics courses with an emphasis on mathematical…

  17. Minimizing Investment Risk of Integrated Rail and Transit-Oriented-Development Projects over Years in a Linear Monocentric City

    Directory of Open Access Journals (Sweden)

    Ding Liu

    2016-01-01

    Full Text Available Rail and transit-oriented-development (TOD projects are simultaneously optimized in this paper, with special consideration given to yearly variation and spatial and temporal correlation of population densities. In the proposed model, the objective is to minimize the investment risk of integrated rail and TOD projects with a given required expected return on investment. The investment risk is optimized based on closed-form solutions of the design variables, including rail line length, the number of TOD projects, and the number of housing units in each TOD project. The closed-form solutions are given explicitly under the assumption of social welfare maximization. It is found that underestimation exists for rail and TOD projects without consideration of the correlation of spatial and temporal population densities. TOD projects can greatly improve the return on investment of the rail operator. A numerical example is also presented.

  18. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  19. The price of policy risk — Empirical insights from choice experiments with European photovoltaic project developers

    International Nuclear Information System (INIS)

    Lüthi, Sonja; Wüstenhagen, Rolf

    2012-01-01

    Managing the transition to a renewable energy future is an important policy priority in many countries. Solar photovoltaic (PV) technology is expected to make an essential contribution, but due to relatively high cost, its growth to date has been largely driven by public policy, notably feed-in tariffs. Feed-in tariffs have been implemented in various countries, but with widely differing outcomes in terms of installed PV capacity. Previous research indicates that the level of policy risk may be an important driver for differences in renewable energy policy effectiveness. This paper suggests that project developers who make a decision between PV investment opportunities in different countries carefully weigh feed-in tariff-induced returns against a set of policy risks, and choose the country with the most favorable risk-return profile. This model is empirically tested by a stated preference survey among European PV project developers, consisting of 1575 choice decisions by 63 investors. The findings demonstrate that risk matters in PV policy design, and that a “price tag” can be attached to specific policy risks, such as the duration of administrative processes or uncertainty induced by an approaching capacity cap. Governments can build on these empirical results to design policies that will be effective in attracting private PV investment, while at the same time maintaining efficiency by providing an adequate compensation for policy risk. - Highlights: ► This study is based on 1575 choice and rating decisions made by 63 European PV project developers. ► This study confirms importance of “non-economic” barriers to deployment of renewable energy. ► This study measures “price of policy risk”, i.e. investors' willingness-to-accept certain policy risks.

  20. ISM Approach to Model Offshore Outsourcing Risks

    Directory of Open Access Journals (Sweden)

    Sunand Kumar

    2014-07-01

    Full Text Available In an effort to achieve a competitive advantage via cost reductions and improved market responsiveness, organizations are increasingly employing offshore outsourcing as a major component of their supply chain strategies. But as evident from literature number of risks such as Political risk, Risk due to cultural differences, Compliance and regulatory risk, Opportunistic risk and Organization structural risk, which adversely affect the performance of offshore outsourcing in a supply chain network. This also leads to dissatisfaction among different stake holders. The main objective of this paper is to identify and understand the mutual interaction among various risks which affect the performance of offshore outsourcing.  To this effect, authors have identified various risks through extant review of literature.  From this information, an integrated model using interpretive structural modelling (ISM for risks affecting offshore outsourcing is developed and the structural relationships between these risks are modeled.  Further, MICMAC analysis is done to analyze the driving power and dependency of risks which shall be helpful to managers to identify and classify important criterions and to reveal the direct and indirect effects of each criterion on offshore outsourcing. Results show that political risk and risk due to cultural differences are act as strong drivers.

  1. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  2. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  3. Microcomputer model for an analysis of the financial feasibility of a mining project

    International Nuclear Information System (INIS)

    Ciruelos, J.; Duchene, M.

    1983-01-01

    The model presented permits a simulation of the predicted profitability of a mining project at the stage of feasibility studies by making use of a simple individual computer, the Apple II. The model presented can be used to treat the following three areas: definition of the mode of financing the project and calculation of the financial flows which make it possible to evaluate the profitability of this project; analysis of sensitivity, which makes it possible to determine the most critical variables for the future of the project; analysis of the risk [fr

  4. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    Science.gov (United States)

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  5. Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314

  6. Managing dependencies in forest offset projects: toward a more complete evaluation of reversal risk

    Science.gov (United States)

    David M Cooley; Chrsitopher S Galik; Thomas P Holmes; Carolyn Kousky; Roger M Cooke

    2011-01-01

    Although forest carbon offsets can play an important role in the implementation of comprehensive climate policy, they also face an inherent risk of reversal. If such risks are positively correlated across projects, it can affect the integrity of larger project portfolios and potentially the entire offsets program. Here, we discuss three types of risks that could affect...

  7. Managing the risks of a large-scale infrastructure project : The case of Spoorzone Delft

    NARCIS (Netherlands)

    Priemus, H.

    2012-01-01

    Risk management in large-scale infrastructure projects is attracting the attention of academics and practitioners alike. After a brief summary of the theoretical background, this paper describes how the risk analysis and risk management shaped up in a current large-scale infrastructure project in

  8. Concordance for prognostic models with competing risks

    DEFF Research Database (Denmark)

    Wolbers, Marcel; Blanche, Paul; Koller, Michael T

    2014-01-01

    The concordance probability is a widely used measure to assess discrimination of prognostic models with binary and survival endpoints. We formally define the concordance probability for a prognostic model of the absolute risk of an event of interest in the presence of competing risks and relate i...

  9. Why operational risk modelling creates inverse incentives

    NARCIS (Netherlands)

    Doff, R.

    2015-01-01

    Operational risk modelling has become commonplace in large international banks and is gaining popularity in the insurance industry as well. This is partly due to financial regulation (Basel II, Solvency II). This article argues that operational risk modelling is fundamentally flawed, despite efforts

  10. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  11. The Global Earthquake Model and Disaster Risk Reduction

    Science.gov (United States)

    Smolka, A. J.

    2015-12-01

    Advanced, reliable and transparent tools and data to assess earthquake risk are inaccessible to most, especially in less developed regions of the world while few, if any, globally accepted standards currently allow a meaningful comparison of risk between places. The Global Earthquake Model (GEM) is a collaborative effort that aims to provide models, datasets and state-of-the-art tools for transparent assessment of earthquake hazard and risk. As part of this goal, GEM and its global network of collaborators have developed the OpenQuake engine (an open-source software for hazard and risk calculations), the OpenQuake platform (a web-based portal making GEM's resources and datasets freely available to all potential users), and a suite of tools to support modelers and other experts in the development of hazard, exposure and vulnerability models. These resources are being used extensively across the world in hazard and risk assessment, from individual practitioners to local and national institutions, and in regional projects to inform disaster risk reduction. Practical examples for how GEM is bridging the gap between science and disaster risk reduction are: - Several countries including Switzerland, Turkey, Italy, Ecuador, Papua-New Guinea and Taiwan (with more to follow) are computing national seismic hazard using the OpenQuake-engine. In some cases these results are used for the definition of actions in building codes. - Technical support, tools and data for the development of hazard, exposure, vulnerability and risk models for regional projects in South America and Sub-Saharan Africa. - Going beyond physical risk, GEM's scorecard approach evaluates local resilience by bringing together neighborhood/community leaders and the risk reduction community as a basis for designing risk reduction programs at various levels of geography. Actual case studies are Lalitpur in the Kathmandu Valley in Nepal and Quito/Ecuador. In agreement with GEM's collaborative approach, all

  12. Projection models for health effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume IV. SPAHR user's guide

    International Nuclear Information System (INIS)

    Collins, J.J.; Lundy, R.T.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. This volume gives the more advanced user of the SPAHR computer package the information required to create tailor-made programs for addressing specific issues not covered by the three interactive packages. It assumes that the user is familiar with the concepts and terms relating to demography and health risk assessment

  13. Evaluating Sources of Risks in Large Engineering Projects: The Roles of Equivocality and Uncertainty

    Directory of Open Access Journals (Sweden)

    Leena Pekkinen

    2015-11-01

    Full Text Available Contemporary project risk management literature introduces uncertainty, i.e., the lack of information, as a fundamental basis of project risks. In this study the authors assert that equivocality, i.e., the existence of multiple and conflicting interpretations, can also serve as a basis of risks. With an in-depth empirical investigation of a large complex engineering project the authors identified risk sources having their bases in the situations where uncertainty or equivocality was the predominant attribute. The information processing theory proposes different managerial practices for risk management based on the sources of risks in uncertainty or equivocality.

  14. The Risk Evaluation of Agricultural High-tech Investment Project%农业高新技术投资项目风险评价

    Institute of Scientific and Technical Information of China (English)

    陆迁; 苗姗姗

    2005-01-01

    The agricultural high-tech investment project (AHIP) is characterized by technology-intensive, high risk and great profit. This article analyzes essential factors of the risks of the agricultural high-tech investment projects and the traditional risk evaluation method of agricultural projects. We think that the applications of the sensitivity analysis and probability are defective. Therefore, this article introduces a structural model to evaluate the risks of the agricultural high-tech investment projects and the system of the concrete evaluation indexes.

  15. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  16. Managing Risk and Uncertainty in Large-Scale University Research Projects

    Science.gov (United States)

    Moore, Sharlissa; Shangraw, R. F., Jr.

    2011-01-01

    Both publicly and privately funded research projects managed by universities are growing in size and scope. Complex, large-scale projects (over $50 million) pose new management challenges and risks for universities. This paper explores the relationship between project success and a variety of factors in large-scale university projects. First, we…

  17. The Role and the Effects of Risk Management in IT Projects Success

    Directory of Open Access Journals (Sweden)

    Otniel DIDRAGA

    2013-01-01

    Full Text Available The success of IT projects is influenced by risk and risk management according to the existing project management literature. The paper emphasizes the role of risk management and its contribution to projects success in the existing literature. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2012 from the main IT project management journals and publications. The results are that risk management is a very important component of the project management process and it is assumed implicitly to work in favour of project success. We also performed a quantitative analysis of how risk management processes affect the subjective and objective performance of IT projects in Romanian IT companies.

  18. Integrated Medical Model Project - Overview and Summary of Historical Application

    Science.gov (United States)

    Myers, J.; Boley, L.; Butler, D.; Foy, M.; Goodenow, D.; Griffin, D.; Keenan, A.; Kerstman, E.; Melton, S.; McGuire, K.; hide

    2015-01-01

    Introduction: The Integrated Medical Model (IMM) Project represents one aspect of NASA's Human Research Program (HRP) to quantitatively assess medical risks to astronauts for existing operational missions as well as missions associated with future exploration and commercial space flight ventures. The IMM takes a probabilistic approach to assessing the likelihood and specific outcomes of one hundred medical conditions within the envelope of accepted space flight standards of care over a selectable range of mission capabilities. A specially developed Integrated Medical Evidence Database (iMED) maintains evidence-based, organizational knowledge across a variety of data sources. Since becoming operational in 2011, version 3.0 of the IMM, the supporting iMED, and the expertise of the IMM project team have contributed to a wide range of decision and informational processes for the space medical and human research community. This presentation provides an overview of the IMM conceptual architecture and range of application through examples of actual space flight community questions posed to the IMM project. Methods: Figure 1 [see document] illustrates the IMM modeling system and scenario process. As illustrated, the IMM computational architecture is based on Probabilistic Risk Assessment techniques. Nineteen assumptions and limitations define the IMM application domain. Scenario definitions include crew medical attributes and mission specific details. The IMM forecasts probabilities of loss of crew life (LOCL), evacuation (EVAC), quality time lost during the mission, number of medical resources utilized and the number and type of medical events by combining scenario information with in-flight, analog, and terrestrial medical information stored in the iMED. In addition, the metrics provide the integrated information necessary to estimate optimized in-flight medical kit contents under constraints of mass and volume or acceptable level of mission risk. Results and Conclusions

  19. CONDITIONS OF SUSTAINABILITY OF INVESTMENT BUILDING PROJECTS BASED ON THE RISK MANAGEMENT CONCEPT

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2012-10-01

    minimization of risky situations requires reduction of the project implementation period; development of domestic methodologies and standards of project risk management tailored to the conditions of our construction industry is a relevant assignment.

  20. Global projections of drought hazard in a warming climate: a prime for disaster risk management

    Science.gov (United States)

    Carrão, Hugo; Naumann, Gustavo; Barbosa, Paulo

    2018-03-01

    Projections of drought hazard ( dH) changes have been mapped from five bias-corrected climate models and analyzed at the global level under three representative concentration pathways (RCPs). The motivation for this study is the observation that drought risk is increasing globally and the effective regulation of prevention and adaptation measures depends on dH magnitude and its distribution for the future. Based on the Weighted Anomaly of Standardized Precipitation index, dH changes have been assessed for mid-(2021-2050) and late-century (2071-2099). With a few exceptions, results show a likely increase in global dH between the historical years (1971-2000) and both future time periods under all RCPs. Notwithstanding this worsening trend, it was found that projections of dH changes for most regions are neither robust nor significant in the near-future. By the end of the century, greater increases are projected for RCPs describing stronger radiative forcing. Under RCP8.5, statistically significant dH changes emerge for global Mediterranean ecosystems and the Amazon region, which are identified as possible hotspots for future water security issues. Taken together, projections of dH changes point towards two dilemmas: (1) in the near-term, stake-holders are left worrying about projected increasing dH over large regions, but lack of actionable model agreement to take effective decisions related to local prevention and adaptation initiatives; (2) in the long-term, models demonstrate remarkable agreement, but stake-holders lack actionable knowledge to manage potential impacts far distant from actual human-dominated environments. We conclude that the major challenge for risk management is not to adapt human populations or their activities to dH changes, but to progress on global initiatives that mitigate their impacts in the whole carbon cycle by late-century.

  1. Natural gas projects in the developing world: An empirical evaluation of merits, obstacles, and risks

    Science.gov (United States)

    Mor, Amit

    Significant amounts of natural gas have been discovered in developing countries throughout the years during the course of oil exploration. The vast majority of these resources have not been utilized. Some developing countries may benefit from a carefully planned utilization of their indigenous resources, which can either be exported or used domestically to substitute imported or exportable fuels or feedstock. Governments, potential private sector investors, and financiers have been searching for strategies to promote natural gas schemes, some of which have been in the pipeline for more than two decades. The purpose of this thesis is to identify the crucial factors determining the success or failure of launching natural gas projects in the developing world. The methodology used to evaluate these questions included: (1) establishing a representative sample of natural gas projects in developing countries that were either implemented or failed to materialize during the 1980-1995 period, (2) utilizing a Probit limited dependent variable econometric model in which the explained variable is project success or failure, and (3) choosing representing indicators to reflect the assumed factors affecting project success. The study identified two conditions for project success: (1) the economic viability of the project and (2) securing financing for the investment. The factors that explain the ability or inability of the sponsors to secure financing were: (1) the volume of investment that represented the large capital costs of gas transportation, distribution, and storage, (2) the level of foreign exchange constraint in the host country, and (3) the level of development of the country. The conditions for private sector participation in natural gas projects in developing countries were identified in the study by a Probit model in which the explained variable was private sector participation. The results showed that a critical condition for private sector participation is the

  2. SR 97. Alternative models project. Stochastic continuum modelling of Aberg

    International Nuclear Information System (INIS)

    Widen, H.; Walker, D.

    1999-08-01

    As part of studies into the siting of a deep repository for nuclear waste, Swedish Nuclear Fuel and Waste Management Company (SKB) has commissioned the Alternative Models Project (AMP). The AMP is a comparison of three alternative modelling approaches to bedrock performance assessment for a single hypothetical repository, arbitrarily named Aberg. The Aberg repository will adopt input parameters from the Aespoe Hard Rock Laboratory in southern Sweden. The models are restricted to an explicit domain, boundary conditions and canister location to facilitate the comparison. The boundary conditions are based on the regional groundwater model provided in digital format. This study is the application of HYDRASTAR, a stochastic continuum groundwater flow and transport-modelling program. The study uses 34 realisations of 945 canister locations in the hypothetical repository to evaluate the uncertainty of the advective travel time, canister flux (Darcy velocity at a canister) and F-ratio. Several comparisons of variability are constructed between individual canister locations and individual realisations. For the ensemble of all realisations with all canister locations, the study found a median travel time of 27 years, a median canister flux of 7.1 x 10 -4 m/yr and a median F-ratio of 3.3 x 10 5 yr/m. The overall pattern of regional flow is preserved in the site-scale model, as is reflected in flow paths and exit locations. The site-scale model slightly over-predicts the boundary fluxes from the single realisation of the regional model. The explicitly prescribed domain was seen to be slightly restrictive, with 6% of the stream tubes failing to exit the upper surface of the model. Sensitivity analysis and calibration are suggested as possible extensions of the modelling study

  3. A methodology for modeling regional terrorism risk.

    Science.gov (United States)

    Chatterjee, Samrat; Abkowitz, Mark D

    2011-07-01

    Over the past decade, terrorism risk has become a prominent consideration in protecting the well-being of individuals and organizations. More recently, there has been interest in not only quantifying terrorism risk, but also placing it in the context of an all-hazards environment in which consideration is given to accidents and natural hazards, as well as intentional acts. This article discusses the development of a regional terrorism risk assessment model designed for this purpose. The approach taken is to model terrorism risk as a dependent variable, expressed in expected annual monetary terms, as a function of attributes of population concentration and critical infrastructure. This allows for an assessment of regional terrorism risk in and of itself, as well as in relation to man-made accident and natural hazard risks, so that mitigation resources can be allocated in an effective manner. The adopted methodology incorporates elements of two terrorism risk modeling approaches (event-based models and risk indicators), producing results that can be utilized at various jurisdictional levels. The validity, strengths, and limitations of the model are discussed in the context of a case study application within the United States. © 2011 Society for Risk Analysis.

  4. Mainstreaming Disaster Risk Management for Finance: Application of Real Options Method for Disaster Risk Sensitive Project

    Directory of Open Access Journals (Sweden)

    KUSDHIANTO SETIAWAN

    Full Text Available This paper discusses the application of real options analysis for a project that is in the process of construction and was affected by a natural disaster. The use of the analytical method has become a way of thinking in making decisions that should be taught to business school students. The case in this paper is based on an MBA thesis at the University of Gadjah Mada that was intended as a showcase for application of real options to address real business problems. It shows one of the strategies in mainstreaming disaster risk management in the business school that also answers the needs of businesses in the disaster-prone country.

  5. Introduction to Financial Projection Models. Business Management Instructional Software.

    Science.gov (United States)

    Pomeroy, Robert W., III

    This guidebook and teacher's guide accompany a personal computer software program and introduce the key elements of financial projection modeling to project the financial statements of an industrial enterprise. The student will then build a model on an electronic spreadsheet. The guidebook teaches the purpose of a financial model and the steps…

  6. A Network Model of Credit Risk Contagion

    Directory of Open Access Journals (Sweden)

    Ting-Qiang Chen

    2012-01-01

    Full Text Available A network model of credit risk contagion is presented, in which the effect of behaviors of credit risk holders and the financial market regulators and the network structure are considered. By introducing the stochastic dominance theory, we discussed, respectively, the effect mechanisms of the degree of individual relationship, individual attitude to credit risk contagion, the individual ability to resist credit risk contagion, the monitoring strength of the financial market regulators, and the network structure on credit risk contagion. Then some derived and proofed propositions were verified through numerical simulations.

  7. Projected lifetime cancer risks from exposure to regional radioactive fallout in the Marshall Islands.

    Science.gov (United States)

    Land, Charles E; Bouville, André; Apostoaei, Iulian; Simon, Steven L

    2010-08-01

    Radioactive fallout from nuclear test detonations during 1946-1958 at Bikini and Enewetak Atolls in the Marshall Islands (MI) exposed populations living elsewhere in the MI archipelago. A comprehensive analysis, presented in seven companion papers, has produced estimates of tissue-specific radiation absorbed dose to MI residents at all historically inhabited atolls from internal (ingested) and external irradiation resulting from exposure to radioactive fallout, by calendar year, and by age of the population at time of exposure. The present report deals, for the first time, with the implications of these doses for cancer risk among exposed members of the MI population. Radiation doses differed by geographic location and year of birth, and radiation-related cancer risk depends upon age at exposure and age at observation for risk. Using dose-response models based on committee reports published by the National Research Council and the National Institutes of Health, we project that, during the lifetimes of members of the MI population potentially exposed to ionizing radiation from weapons test fallout deposited during the testing period (1948-1958) and from residual radioactive sources during the subsequent 12 y (1959-1970), perhaps 1.6% (with 90% uncertainty range 0.4% to 3.4%) of all cancers might be attributable to fallout-related radiation exposures. By sub-population, the projected proportion of cancers attributable to radiation from fallout from all nuclear tests conducted in the Marshall Islands is 55% (28% to 69%) among 82 persons exposed in 1954 on Rongelap and Ailinginae, 10% (2.4% to 22%) for 157 persons exposed on Utrik, and 2.2% (0.5% to 4.8%) and 0.8% (0.2% to 1.8%), respectively, for the much larger populations exposed in mid-latitude locations including Kwajalein and in southern locations including Majuro. By cancer type, point estimates of attributable risk varied, by location, between 12% and 95% for thyroid cancer, between 2% and 78% for leukemia, and

  8. Expert judgement models in quantitative risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Rosqvist, T. [VTT Automation, Helsinki (Finland); Tuominen, R. [VTT Automation, Tampere (Finland)

    1999-12-01

    Expert judgement is a valuable source of information in risk management. Especially, risk-based decision making relies significantly on quantitative risk assessment, which requires numerical data describing the initiator event frequencies and conditional probabilities in the risk model. This data is seldom found in databases and has to be elicited from qualified experts. In this report, we discuss some modelling approaches to expert judgement in risk modelling. A classical and a Bayesian expert model is presented and applied to real case expert judgement data. The cornerstone in the models is the log-normal distribution, which is argued to be a satisfactory choice for modelling degree-of-belief type probability distributions with respect to the unknown parameters in a risk model. Expert judgements are qualified according to bias, dispersion, and dependency, which are treated differently in the classical and Bayesian approaches. The differences are pointed out and related to the application task. Differences in the results obtained from the different approaches, as applied to real case expert judgement data, are discussed. Also, the role of a degree-of-belief type probability in risk decision making is discussed.

  9. Expert judgement models in quantitative risk assessment

    International Nuclear Information System (INIS)

    Rosqvist, T.; Tuominen, R.

    1999-01-01

    Expert judgement is a valuable source of information in risk management. Especially, risk-based decision making relies significantly on quantitative risk assessment, which requires numerical data describing the initiator event frequencies and conditional probabilities in the risk model. This data is seldom found in databases and has to be elicited from qualified experts. In this report, we discuss some modelling approaches to expert judgement in risk modelling. A classical and a Bayesian expert model is presented and applied to real case expert judgement data. The cornerstone in the models is the log-normal distribution, which is argued to be a satisfactory choice for modelling degree-of-belief type probability distributions with respect to the unknown parameters in a risk model. Expert judgements are qualified according to bias, dispersion, and dependency, which are treated differently in the classical and Bayesian approaches. The differences are pointed out and related to the application task. Differences in the results obtained from the different approaches, as applied to real case expert judgement data, are discussed. Also, the role of a degree-of-belief type probability in risk decision making is discussed

  10. Risk management of PPP project in the preparation stage based on Fault Tree Analysis

    Science.gov (United States)

    Xing, Yuanzhi; Guan, Qiuling

    2017-03-01

    The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.

  11. A suite of models to support the quantitative assessment of spread in pest risk analysis

    NARCIS (Netherlands)

    Robinet, C.; Kehlenbeck, H.; Werf, van der W.

    2012-01-01

    In the frame of the EU project PRATIQUE (KBBE-2007-212459 Enhancements of pest risk analysis techniques) a suite of models was developed to support the quantitative assessment of spread in pest risk analysis. This dataset contains the model codes (R language) for the four models in the suite. Three

  12. Risk modelling study for carotid endarterectomy.

    Science.gov (United States)

    Kuhan, G; Gardiner, E D; Abidia, A F; Chetter, I C; Renwick, P M; Johnson, B F; Wilkinson, A R; McCollum, P T

    2001-12-01

    The aims of this study were to identify factors that influence the risk of stroke or death following carotid endarterectomy (CEA) and to develop a model to aid in comparative audit of vascular surgeons and units. A series of 839 CEAs performed by four vascular surgeons between 1992 and 1999 was analysed. Multiple logistic regression analysis was used to model the effect of 15 possible risk factors on the 30-day risk of stroke or death. Outcome was compared for four surgeons and two units after adjustment for the significant risk factors. The overall 30-day stroke or death rate was 3.9 per cent (29 of 741). Heart disease, diabetes and stroke were significant risk factors. The 30-day predicted stroke or death rates increased with increasing risk scores. The observed 30-day stroke or death rate was 3.9 per cent for both vascular units and varied from 3.0 to 4.2 per cent for the four vascular surgeons. Differences in the outcomes between the surgeons and vascular units did not reach statistical significance after risk adjustment. Diabetes, heart disease and stroke are significant risk factors for stroke or death following CEA. The risk score model identified patients at higher risk and aided in comparative audit.

  13. Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.

  14. Assessing reservoir performance risk in CO{sub 2} storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, A.R. [URS Corp., San Francisco, CA (United States); Rigg, A. [CRC for Greenhouse Gas Technologies, Canberra (Australia)

    2005-07-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO{sub 2}) has been the development of a proper methodology to assess and compare alternative CO{sub 2} injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO{sub 2}, and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO{sub 2} injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO{sub 2} injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs.

  15. RISK MANAGEMENT IN THE OPERATING ACTIVITIES OF AN ENTERPRISE AND IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

    Directory of Open Access Journals (Sweden)

    Lech Jędrzejewski

    2017-03-01

    Full Text Available The paper is devoted to issues related to building a risk management system for businesses in the areas of operations and implementation of infrastructure projects. The article defines the concept of risk in business processes and identifies risks occurring in infrastructure projects. In the text, the principles have been presented for protection against the effects of political, contracting, environmental, ecological, product, process, operational and personnel risk.

  16. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  17. Dose and risk assessment approach for the Fernald CERCLA D ampersand D Project

    International Nuclear Information System (INIS)

    Throckmorton, J.D.; Clark, T.R.; Waligora, S.J. Jr.; Haaker, R.F.

    1994-01-01

    At the Fernald Environmental Management Project (FEMP) the uranium processing facilities used from the 1952 through 1989 are near or beyond their intended design life. These current conditions present an increasing probability for future releases of hazardous substances to the environment. To support a decision by the U.S. Department of Energy (DOE) and the Environmental Protection Agency (EPA) to remediate the buildings, a dose and risk assessment was performed to determine the extent of exposure that would be associated with the controlled decontamination and dismantlement (D ampersand D) of the Fernald facilities. A conceptual risk assessment model was developed, with exposure mechanisms and associated pathways for each potential receptor. The three receptor groups were defined as: the remediation workers, other on-site workers (those not performing D ampersand D), and off-site residents. For use in the conceptual model, an airborne source term was developed through process knowledge, other historical information and data, and air sample data from within the facilities. Individual and collective doses and risks were developed for each receptor and for each population group. The risk assessment demonstrated that all exposures resulting from the action would be within the acceptable DOE administrative control level of 2.0 rem per year for occupational workers and the acceptable EPA risk range from 10 -6 to 10 -4 for the general public

  18. Competing Risks Copula Models for Unemployment Duration

    DEFF Research Database (Denmark)

    Lo, Simon M. S.; Stephan, Gesine; Wilke, Ralf

    2017-01-01

    The copula graphic estimator (CGE) for competing risks models has received little attention in empirical research, despite having been developed into a comprehensive research method. In this paper, we bridge the gap between theoretical developments and applied research by considering a general...... class of competing risks copula models, which nests popular models such as the Cox proportional hazards model, the semiparametric multivariate mixed proportional hazards model (MMPHM), and the CGE as special cases. Analyzing the effects of a German Hartz reform on unemployment duration, we illustrate...

  19. The KnowRISK project: Tools and strategies for risk communication and learning

    Science.gov (United States)

    Musacchio, Gemma; Amaral Ferreira, Mónica; Falsaperla, Susanna; Piangiamore, Giovanna Lucia; Pino, Nicola Alessandro; Solarino, Stefano; Crescimbene, Massimo; Eva, Elena; Reitano, Danilo; Þorvaldsdottir, Solveig; Sousa Silva, Delta; Rupakhety, Rajesh; Sousa Oliveira, Carlos

    2016-04-01

    Damage of non-structural elements of buildings (i.e. partitions, ceilings, cladding, electrical and mechanical systems and furniture) is known to cause injuries and human losses. Also it has a significant impact on earthquake resilience and is yet being worldwide underestimated. The project KnowRISK (Know your city, Reduce seISmic risK through non-structural elements) is financed by the European Commission to develop prevention measures that may reduce non-structural damage in urban areas. Pilot areas of the project are within the three European participating countries, namely Portugal, Iceland and Italy. They were chosen because they are prone to damage level 2 and 3 (EMS-98, European Macroseismic Scale) that typically affects non-structural elements. We will develop and test a risk communication strategy taking into account the needs of households and schools, putting into practice a portfolio of best practice to reduce the most common non-structural vulnerabilities. We will target our actions to different societal groups, considering their cultural background and social vulnerabilities, and implement a participatory approach that will promote engagement and interaction between the scientific community, practitioners and citizens to foster knowledge on everyone's own neighborhoods, resilience and vulnerability. A Practical Guide for citizens will highlight that low-cost actions can be implemented to increase safety of households, meant as being the places where the most vulnerable societal groups, including children and elderly people, spend much of their time. Since our actions towards communication will include education, we will define tools that allow a clear and direct understanding of elements exposed to risk. Schools will be one of our target societal groups and their central role played at the community level will ensure spreading and strengthening of the communication process. Schools are often located in old or re-adapted buildings, formerly used for

  20. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  1. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  2. Risk Monitoring through Traceability Information Model

    OpenAIRE

    Juan P. Zamora; Wilson Adarme; Laura Palacios

    2012-01-01

    This paper shows a traceability framework for supply risk monitoring, beginning with the identification, analysis, and evaluation of the supply chain risk and focusing on the supply operations of the Health Care Institutions with oncology services in Bogota, Colombia. It includes a brief presentation of the state of the art of the Supply Chain Risk Management and traceability systems in logistics operations, and it concludes with the methodology to integrate the SCRM model with the traceabili...

  3. Criterion of Semi-Markov Dependent Risk Model

    Institute of Scientific and Technical Information of China (English)

    Xiao Yun MO; Xiang Qun YANG

    2014-01-01

    A rigorous definition of semi-Markov dependent risk model is given. This model is a generalization of the Markov dependent risk model. A criterion and necessary conditions of semi-Markov dependent risk model are obtained. The results clarify relations between elements among semi-Markov dependent risk model more clear and are applicable for Markov dependent risk model.

  4. Risk management model of winter navigation operations

    International Nuclear Information System (INIS)

    Valdez Banda, Osiris A.; Goerlandt, Floris; Kuzmin, Vladimir; Kujala, Pentti; Montewka, Jakub

    2016-01-01

    The wintertime maritime traffic operations in the Gulf of Finland are managed through the Finnish–Swedish Winter Navigation System. This establishes the requirements and limitations for the vessels navigating when ice covers this area. During winter navigation in the Gulf of Finland, the largest risk stems from accidental ship collisions which may also trigger oil spills. In this article, a model for managing the risk of winter navigation operations is presented. The model analyses the probability of oil spills derived from collisions involving oil tanker vessels and other vessel types. The model structure is based on the steps provided in the Formal Safety Assessment (FSA) by the International Maritime Organization (IMO) and adapted into a Bayesian Network model. The results indicate that ship independent navigation and convoys are the operations with higher probability of oil spills. Minor spills are most probable, while major oil spills found very unlikely but possible. - Highlights: •A model to assess and manage the risk of winter navigation operations is proposed. •The risks of oil spills in winter navigation in the Gulf of Finland are analysed. •The model assesses and prioritizes actions to control the risk of the operations. •The model suggests navigational training as the most efficient risk control option.

  5. Changing pattern of landslide risk in Europe - The SafeLand project

    Science.gov (United States)

    Nadim, F.; Kalsnes, B.

    2012-04-01

    The need to protect people and property with a changing pattern of landslide hazard and risk caused by climate change and changes in demography, and the reality for societies in Europe to live with the risk associated with natural hazards, were the motives for the project SafeLand: "Living with landslide risk in Europe: Assessment, effects of global change, and risk management strategies." SafeLand is a large, integrating research project under the European Commission's 7th Framework Programme (FP7). The project started on 1 May 2009 and will end on 30 April 2012. It involves 27 partners from 12 European countries, and has international collaborators and advisers from China, India, USA, Japan and Hong Kong. SafeLand also involves 25 End-Users from 11 countries. SafeLand is coordinated by the International Centre for Geohazards (ICG) at Norwegian Geotechnical Institute in Norway. Further information on the SafeLand project can be found at its web site http://safeland-fp7.eu/. Main results achieved in SafeLand include: - Various guidelines related to landslide triggering processes and run-out modelling. - Development and testing of several empirical methods for predicting the characteristics of threshold rainfall events for triggering of precipitation-induced landslides, and development of an empirical model for assessing the changes in landslide frequency (hazard) as a function of changes in the demography and population density. - Guideline for landslide susceptibility, hazard and risk assessment and zoning. - New methodologies for physical and societal vulnerability assessment. - Identification of landslide hazard and risk hotspots for Europe. The results show clearly where areas with the largest landslide risk are located in Europe and the objective approach allows a ranking of the countries by exposed area and population. - Different regional and local climate model simulations over selected regions of Europe at spatial resolutions of 10x10 km and 2.8x2.8 km

  6. Research on Risk Evaluation of Transnational Power Networking Projects Based on the Matter-Element Extension Theory and Granular Computing

    Directory of Open Access Journals (Sweden)

    Jinying Li

    2017-10-01

    Full Text Available In project management, risk assessment is crucial for stakeholders to identify the risk factors during the whole life cycle of the project. A risk evaluation index system of a transnational networking project, which provides an effective way for the grid integration of clean electricity and the sustainable development of the power industry, is constructed in this paper. Meanwhile, a combination of granular computing and order relation analysis (G1 method is applied to determine the weight of each indicator and the matter-element extension evaluation model is also employed to seek the global optimal decision during the risk assessment. Finally, a case study is given to validate the index system and evaluation model established in this paper by assessing two different investment schemes of a transnational high voltage direct current (HVDC transmission project. The result shows that the comprehensive risk level of Scheme 1 is “Low” and the level of Scheme 2 is “General”, which means Scheme 1 is better for the stakeholders from the angle of risk control. The main practical significance of this paper lies in that it can provide a reference and decision support for the government’s power sectors, investment companies and other stakeholders when carrying out related activities.

  7. Multi-Agent Modeling in Managing Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    K. Y. Chau

    2009-10-01

    Full Text Available In this paper, a multi-agent model is proposed for considering the human resources factor in decision making in relation to the six sigma project. The proposed multi-agent system is expected to increase the acccuracy of project prioritization and to stabilize the human resources service level. A simulation of the proposed multiagent model is conducted. The results show that a multi-agent model which takes into consideration human resources when making decisions about project selection and project team formation is important in enabling efficient and effective project management. The multi-agent modeling approach provides an alternative approach for improving communication and the autonomy of six sigma projects in business organizations.

  8. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  9. Finite detector based projection model for super resolution CT

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Hengyong; Wang, Ge [Wake Forest Univ. Health Sciences, Winston-Salem, NC (United States). Dept. of Radiology; Virgina Tech, Blacksburg, VA (United States). Biomedical Imaging Div.

    2011-07-01

    For finite detector and focal spot sizes, here we propose a projection model for super resolution CT. First, for a given X-ray source point, a projection datum is modeled as an area integral over a narrow fan-beam connecting the detector elemental borders and the X-ray source point. Then, the final projection value is expressed as the integral obtained in the first step over the whole focal spot support. An ordered-subset simultaneous algebraic reconstruction technique (OS-SART) is developed using the proposed projection model. In the numerical simulation, our method produces super spatial resolution and suppresses high-frequency artifacts. (orig.)

  10. MODEL OF THE PROJECT – ORIENTED SOCIETY

    Directory of Open Access Journals (Sweden)

    Marian CLIPICI

    2013-12-01

    Full Text Available In many national societies, projects and programmes are performed not only in companies but also in other organizations, such as municipal administrations, associations, schools and ever in families. The globalization of the economy, new technologies with ever-shorter product life cycles and the application of a new management paradigm, characterized by virtual organizations, „empowerment” and knowledge management, promote the use of project and programme management. The article describes the implementation of an integrated waste management in the county of Arges, in accordance with the requirements and provisions of European Community Directives, in order to preserve, protect and improve environmental quality in Arges (project "Integrated management of solid waste in Arges".

  11. The air emissions risk assessment model (AERAM)

    International Nuclear Information System (INIS)

    Gratt, L.B.

    1991-01-01

    AERAM is an environmental analysis and power generation station investment decision support tool. AERAM calculates the public health risk (in terms of the lifetime cancers) in the nearby population from pollutants released into the air. AERAM consists of four main subroutines: Emissions, Air, Exposure and Risk. The Emission subroutine uses power plant parameters to calculate the expected release of the pollutants. A coal-fired and oil-fired power plant are currently available. A gas-fired plant model is under preparation. The release of the pollutants into the air is followed by their dispersal in the environment. The dispersion in the Air Subroutine uses the Environmental Protection Agency's model, Industrial Source Complex-Long Term. Additional dispersion models (Industrial Source Complex - Short Term and Cooling Tower Drift) are being implemented for future AERAM versions. The Expose Subroutine uses the ambient concentrations to compute population exposures for the pollutants of concern. The exposures are used with corresponding dose-response model in the Risk Subroutine to estimate both the total population risk and individual risk. The risk for the dispersion receptor-population centroid for the maximum concentration is also calculated for regulatory-population purposes. In addition, automated interfaces with AirTox (an air risk decision model) have been implemented to extend AERAM's steady-state single solution to the decision-under-uncertainty domain. AERAM was used for public health risks, the investment decision for additional pollution control systems based on health risk reductions, and the economics of fuel vs. health risk tradeoffs. AERAM provides that state-of-the-art capability for evaluating the public health impact airborne toxic substances in response to regulations and public concern

  12. Radiation exposure modeling and project schedule visualization

    International Nuclear Information System (INIS)

    Jaquish, W.R.; Enderlin, V.R.

    1995-10-01

    This paper discusses two applications using IGRIP (Interactive Graphical Robot Instruction Program) to assist environmental remediation efforts at the Department of Energy (DOE) Hanford Site. In the first application, IGRIP is used to calculate the estimated radiation exposure to workers conducting tasks in radiation environments. In the second, IGRIP is used as a configuration management tool to detect interferences between equipment and personnel work areas for multiple projects occurring simultaneously in one area. Both of these applications have the capability to reduce environmental remediation costs by reducing personnel radiation exposure and by providing a method to effectively manage multiple projects in a single facility

  13. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  14. Integrating knowledge for managing risk in infrastructure projects : the case of tunnel works

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen

    2012-01-01

    The objective of traditional approaches to project risk management is to identify risks that can lead to project failure and to implement effective strategies to manage them. Information on the relevant causes and conditions in which failures arise is usually required as necessary input for

  15. Students in a School Environment: A Project Focused on Family Involvement of At-Risk

    Science.gov (United States)

    Denney, Pat

    2011-01-01

    This project examined family involvement of at risk students in mid-west communities. The purpose of this project was to study the affect of family involvement on at-risk student achievement. The redefining of the perception of America has resulted in a crisis of academic performance in the traditionally slow-changing education systems. This topic…

  16. Model based climate information on drought risk in Africa

    Science.gov (United States)

    Calmanti, S.; Syroka, J.; Jones, C.; Carfagna, F.; Dell'Aquila, A.; Hoefsloot, P.; Kaffaf, S.; Nikulin, G.

    2012-04-01

    The United Nations World Food Programme (WFP) has embarked upon the endeavor of creating a sustainable Africa-wide natural disaster risk management system. A fundamental building block of this initiative is the setup of a drought impact modeling platform called Africa Risk-View that aims to quantify and monitor weather-related food security risk in Africa. The modeling approach is based the Water Requirement Satisfaction Index (WRSI), as the fundamental indicator of the performances of agriculture and uses historical records of food assistance operation to project future potential needs for livelihood protection. By using climate change scenarios as an input to Africa Risk-View it is possible, in principles, to evaluate the future impact of climate variability on critical issues such as food security and the overall performance of the envisaged risk management system. A necessary preliminary step to this challenging task is the exploration of the sources of uncertainties affecting the assessment based on modeled climate change scenarios. For this purpose, a limited set of climate models have been selected in order verify the relevance of using climate model output data with Africa Risk-View and to explore a minimal range of possible sources of uncertainty. This first evaluation exercise started before the setup of the CORDEX framework and has relied on model output available at the time. In particular only one regional downscaling was available for the entire African continent from the ENSEMBLES project. The analysis shows that current coarse resolution global climate models can not directly feed into the Africa RiskView risk-analysis tool. However, regional downscaling may help correcting the inherent biases observed in the datasets. Further analysis is performed by using the first data available under the CORDEX framework. In particular, we consider a set of simulation driven with boundary conditions from the reanalysis ERA-Interim to evaluate the skill drought

  17. Risk assessment of underpass infrastructure project based on IS0 31000 and ISO 21500 using fishbone diagram and RFMEA (project risk failure mode and effects analysis) method

    Science.gov (United States)

    Purwanggono, Bambang; Margarette, Anastasia

    2017-12-01

    Completion time of highway construction is very meaningful for smooth transportation, moreover expected number of ownership motor vehicle will increase each year. Therefore, this study was conducted with to analyze the constraints that contained in an infrastructure development project. This research was conducted on Jatingaleh Underpass Project, Semarang. This research was carried out while the project is running, on the implementation, this project is experiencing delays. This research is done to find out what are the constraints that occur in execution of a road infrastructure project, in particular that causes delays. The method that used to find the root cause is fishbone diagram to obtain a possible means of mitigation. Coupled with the RFMEA method used to determine the critical risks that must be addressed immediately on road infrastructure project. The result of data tabulation in this study indicates that the most possible mitigation tool to make a Standard Operating Procedure (SOP) recommendations to disrupt utilities that interfere project implementation. Process of risk assessment has been carried out systematically based on ISO 31000:2009 on risk management and for determination of delayed variables, the requirements of process groups according to ISO 21500:2013 on project management were used.

  18. A methodological model to assist in the optimization and risk management of mining investment decisions

    International Nuclear Information System (INIS)

    Botin, Jose A; Guzman, Ronald R; Smith, Martin L

    2011-01-01

    Identifying, quantifying, and minimizing technical risks associated with investment decisions is a key challenge for mineral industry decision makers and investors. However, risk analysis in most bankable mine feasibility studies are based on the stochastic modeling of project N et Present Value (NPV)which, in most cases, fails to provide decision makers with a truly comprehensive analysis of risks associated with technical and management uncertainty and, as a result, are of little use for risk management and project optimization. This paper presents a value-chain risk management approach where project risk is evaluated for each step of the project life cycle, from exploration to mine closure, and risk management is performed as a part of a stepwise value-added optimization process.

  19. [A model list of high risk drugs].

    Science.gov (United States)

    Cotrina Luque, J; Guerrero Aznar, M D; Alvarez del Vayo Benito, C; Jimenez Mesa, E; Guzman Laura, K P; Fernández Fernández, L

    2013-12-01

    «High-risk drugs» are those that have a very high «risk» of causing death or serious injury if an error occurs during its use. The Institute for Safe Medication Practices (ISMP) has prepared a high-risk drugs list applicable to the general population (with no differences between the pediatric and adult population). Thus, there is a lack of information for the pediatric population. The main objective of this work is to develop a high-risk drug list adapted to the neonatal or pediatric population as a reference model for the pediatric hospital health workforce. We made a literature search in May 2012 to identify any published lists or references in relation to pediatric and/or neonatal high-risk drugs. A total of 15 studies were found, from which 9 were selected. A model list was developed mainly based on the ISMP one, adding strongly perceived pediatric risk drugs and removing those where the pediatric use was anecdotal. There is no published list that suits pediatric risk management. The list of pediatric and neonatal high-risk drugs presented here could be a «reference list of high-risk drugs » for pediatric hospitals. Using this list and training will help to prevent medication errors in each drug supply chain (prescribing, transcribing, dispensing and administration). Copyright © 2013 Asociación Española de Pediatría. Published by Elsevier Espana. All rights reserved.

  20. A Model of and for Virtual Projects

    NARCIS (Netherlands)

    Garud, R.; Kumaraswamy, A.; Tuertscher, P.R.; Cattani, G.; Ferriani, S.; Frederiksen, L.; Täube, F.

    2011-01-01

    We examine how digital technologies enable distributed actors to collaborate asynchronously on virtual projects. We use Wikipedia and associated wiki digital technology as the research site for our exploration. Our probe of the emergence of Wikipedia articles highlights a distinctive property of

  1. Fuzzy system for risk analysis in software projects through the attributes of quality standards iso 25000

    Directory of Open Access Journals (Sweden)

    Chau Sen Shia

    2014-02-01

    Full Text Available With the growth in demand for products and services in the IT area, companies encounter difficulties in establishing a metric or measure of quality of services to address measurably qualitative values in their planning. In this work fuzzy logic, standard SQuaRE (measurement of the quality of software products, Likertscale, GQM method (Goal-Question-Metric -indicator of quality of Software and the project risk analysis model of Boehm were used to assess the quality of services and decision-making, according to your demand and requests for software development. With the aim of improving the quality in the provision of services, the application is used to integrate the team and follow the life cycle of a project from its initial phase, and to assist in the comparison with the proposed schedule during the requirements elicitation.

  2. An Exploratory Study of the Effects of Project Finance on Project Risk Management : How the Distinguishing Attributes of Project Finance affects the Prevailing Risk Factor?

    OpenAIRE

    Chan, Ka Fai

    2011-01-01

    Project finance is a financing arrangement for projects, and it is characterised by the creation of a legally independent project company financed with non- or limited recourse loans. It is observed that the popularity of project finance is increasing in the recent decades, despite of the impact of Asian financial crisis. Especially in emerging markets, project finance is very common among the public-private partnership projects. It is possible that project finance yields some benefits in pro...

  3. Risk level project. Summary report, Norwegian Shelf, Phase 7; Risikonivaaprosjektet. Sammendragsrapport Norsk Sokkel, fase 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    The project 'developments in risk level - Norwegian shelf', also known as the risk level project, was initiated by the Norwegian Petroleum Directorate in 2000. From 2004 the project has been continued by Petroleum Safety Authority Norway. The project's main objectives are to measure the effect of the health, security and environment (HSE) work in the industry, and contribute to identify the areas critical to HSE, where efforts must be made to prevent unwanted events or accidents. A summary report with results from phase 7 in the project (ml)

  4. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  5. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    Science.gov (United States)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  6. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  7. Implications of commodity price risk and operating leverage on petroleum project economic evaluations

    International Nuclear Information System (INIS)

    Salahor, G.; Laughton, D.G.

    1999-01-01

    The modern asset pricing method, MAP, can provide businesses with improved tools for economic analysis. This in turn leads to greater precision in the analysis of the effects of the following parameters: project structure, time, and uncertainty. This greater precision with MAP extends to analysis of the possibility for active control of the decision alternatives for managers in the petroleum business, especially where this possibility is not questioned. A methodology is developed as a model that quantifies revenue risk based on the nature of commodity price volatility and the accepted price of risk in the commodity market. A mathematical description is included of a natural gas log-normal distribution incorporating the annual volatility in the forecast, and a measure of the rate at which volatility decreases in the long run in the forecast. Give this volatility model, a risk discount factor is determinable and applicable to the current expectation of the commodity prices at a given time, and a discount time factor of all parts of the cash flow stream. Cases are used to evaluate a natural gas development project for the purpose of yielding scenarios for capital vs. operating cost trade-offs, price risk management, production profile, and the effect of the reverting vs. non-reverting price model. In application one, a comparison is made of discounted cash flow (DCF) to MAP evaluations giving a perspective on the various development choices which a producer has through third-party service providers. Further, an example is used to compare the two methods as alternative evaluations of development alternatives to speed up or slow down the production rate and decline profile of a gas field. As in the first example, the DCF discounting is higher than the net discounting in the MAP evaluation. But in this example both methods produce the same project structure decision. The small amount of incremental capital and operating costs needed for the higher production case are

  8. Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

    OpenAIRE

    O. Badagadze; G. Sirbiladze; I. Khutsishvili

    2014-01-01

    The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

  9. The project of model practices in family medicine in Slovenia

    Directory of Open Access Journals (Sweden)

    Tonka Poplas Susič

    2013-11-01

    Full Text Available Background: Primary health care has undergone great changes as a consequence of demographic changes, growing patients’ awareness and organizational changes in the healthcare system. Declining interest in family medicine specialization further worsens the situation. In the period of lack of GPs and their overloading, it is necessary to include a diploma graduate nurse in the team of GPs and to define competencies and activities in such a way that encourage more active approach to the patients, meeting the indicators of quality.The purpose of the article is to describe the project of model practice in Slovenia and to present some results.Methods: A model practice introduces a new concept in the areas of human resource standards (to existing team, a diploma graduate nurse is included on a part-time basis; work competences (use of protocols for the treatment of chronic patients, extended and well-defined preventive screenings, establishing registers of chronic patients and assessing quality by means of quality indicators and work management (redistribution of workload .Results: Due to great interest of general practitioners, a total of 271 model practices were introduced in 2011 and 2012. MPs have been distributed evenly through different regions inSlovenia. Registers of patients with chronic diseases (COPD, asthma and diabetes have been established and during the preventive screening, on average 2 patients with a chronic disease and 15 patients with risk factors have been detected. Patients are treated actively according to their needs rather than their preferences.Conclusions: The project of MPs enables a high quality and cost effectiveness of patients’ treatment in family medicine. With a gradual introducing of new MPs, a well planed and monitored patients’ care will be implemented in the practice. In a long run, disburdening of a secondary care level and more rational consumption of drugs are expected

  10. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C. (Brookhaven National Lab., Upton, NY (United States)); Anspaugh, L.; Layton, D. (Lawrence Livermore National Lab., CA (United States))

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  11. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated

  12. Risk Management Capability Maturity and Performance of Complex Product and System (CoPS Projects with an Asian Perspective

    Directory of Open Access Journals (Sweden)

    Ren, Y.

    2014-07-01

    Full Text Available Complex Products and Systems (CoPS are high value, technology and engineering-intensive capital goods. The motivation of this study is the persistent high failure rate of CoPS projects, Asian CoPS provider’s weak capability and lack of specific research on CoPS risk management. This paper evaluates risk management maturity level of CoPS projects against a general CoPS risk management capability maturity model (RM-CMM developed by the authors. An Asian based survey was conducted to investigate the value of RM to project performance, and Asian (non-Japanese CoPS implementers’ perceived application of RM practices, their strengths and weaknesses. The survey result shows that higher RM maturity level leads to higher CoPS project performance. It also shows project complexity and uncertainty moderates the relationship between some RM practices and project performance, which implies that a contingency approach should be adopted to manage CoPS risks effectively. In addition, it shows that Asian CoPS implementers are weak in RM process and there are also rooms for improvement in the softer aspects of organizational capabilities and robustness.

  13. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  14. Ecological models and pesticide risk assessment: current modeling practice.

    Science.gov (United States)

    Schmolke, Amelie; Thorbek, Pernille; Chapman, Peter; Grimm, Volker

    2010-04-01

    Ecological risk assessments of pesticides usually focus on risk at the level of individuals, and are carried out by comparing exposure and toxicological endpoints. However, in most cases the protection goal is populations rather than individuals. On the population level, effects of pesticides depend not only on exposure and toxicity, but also on factors such as life history characteristics, population structure, timing of application, presence of refuges in time and space, and landscape structure. Ecological models can integrate such factors and have the potential to become important tools for the prediction of population-level effects of exposure to pesticides, thus allowing extrapolations, for example, from laboratory to field. Indeed, a broad range of ecological models have been applied to chemical risk assessment in the scientific literature, but so far such models have only rarely been used to support regulatory risk assessments of pesticides. To better understand the reasons for this situation, the current modeling practice in this field was assessed in the present study. The scientific literature was searched for relevant models and assessed according to nine characteristics: model type, model complexity, toxicity measure, exposure pattern, other factors, taxonomic group, risk assessment endpoint, parameterization, and model evaluation. The present study found that, although most models were of a high scientific standard, many of them would need modification before they are suitable for regulatory risk assessments. The main shortcomings of currently available models in the context of regulatory pesticide risk assessments were identified. When ecological models are applied to regulatory risk assessments, we recommend reviewing these models according to the nine characteristics evaluated here. (c) 2010 SETAC.

  15. Study On Risk Handling Strategy Of Road Contruction Projects In Jayapura City

    Directory of Open Access Journals (Sweden)

    Irianto

    2017-08-01

    Full Text Available Project risk is an event or an uncertain condition which if it appears will have a threat on the project object. Many contractors still do not understand the threats that occur in the project they still assume that risks are always harmful. Based on data from the Papua Public Works procurement service that the implementation of road improvement projects always faces problems. This research is an explorative and descriptive study which explores the risks threats that occur in the project from the contractors perspective in Jayapura Papua Province Indonesia. The object of this research is the company contractor involved in the implementation of road improvement project in Jayapura whereas the respondent is the project manager and the field supervisor involved in the implementation of road improvement project The analysis result shows that the overall level of risk is in very low category and the biggest risks affecting contractors in sequence are 1 material delays from suppliers 2 material inventories 3 design difficulties 4 incorrectly shipped material volumes 5 changes to specifications by the owner 6 difficulty in obtaining materials and equipment 7 material price increases 8 over quality 9 damage to machine tools 10 weakening the bearing capacity of subgrade soil. While the response to risks threats that occur in road improvement projects is to reduce and avoid.

  16. Application of an integrated model for evaluation and optimization of business projects portfolios

    Directory of Open Access Journals (Sweden)

    Camila Costa Dutra

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio.

  17. APPLICATION OF AN INTEGRATED MODEL FOR EVALUATION AND OPTIMIZATION OF BUSINESS PROJECTS PORTFOLIOS

    Directory of Open Access Journals (Sweden)

    Maria Auxiliadora Cannarozzo Tinoco

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio

  18. Java project on periodontal diseases. The natural development of periodontitis: risk factors, risk predictors and risk determinants : risk factors, risk predictors and risk determinants

    NARCIS (Netherlands)

    Van der Velden, U.; Abbas, F.; Armand, S.; Loos, B. G.; Timmerman, M. F.; Van der Weijden, G. A.; Van Winkelhoff, A. J.; Winkel, E. G.

    Objective: To identify risk factors, risk predictors and risk determinants for onset and progression of periodontitis. Material and Methods: For this longitudinal, prospective study all subjects in the age range 15-25 years living in a village of approximately 2000 inhabitants at a tea estate on

  19. Identification of risk factors affecting construction of projects: The case of emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available Controlling project risks has become a daunting task in construction and this can be attributed to issues such as the nature of modern projects. The challenge is that risk appears unannounced at any project phase for various reasons and thereby affecting the performance and the success of unprepared projects. The current studies that explored risk matters include Pehlivan and Öztemir (2015, Katre, and Ghaitidak (2016 amongst others. However, there is absence of unanimity from these studies on risk factors in construction. Thus, this article was instigated in order to identify and classify risk factors that affect the chances of project success. The research methodology selected for this article comprised of peer-reviewed articles between the periods of 2007 to 2017. This approach involved a comprehensive scrutiny into scholarly articles to comprehend risks in construction projects. Following a conceptual analysis, eighty factors were identified and classified under the following; technical, construction, financial, socio-political, physical, organisational, and environmental and other risks. From these categories, political instability was, found to be the most influential risk factor in construction projects and this factor was classified within the socio-political category and this category has total of 11 factors. Finding suggests the need for further empirical study.

  20. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  1. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Directory of Open Access Journals (Sweden)

    Sam Nicol

    Full Text Available Environmental impact assessment (EIA is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  2. The Lunar Phases Project: A Mental Model-Based Observational Project for Undergraduate Nonscience Majors

    Science.gov (United States)

    Meyer, Angela Osterman; Mon, Manuel J.; Hibbard, Susan T.

    2011-01-01

    We present our Lunar Phases Project, an ongoing effort utilizing students' actual observations within a mental model building framework to improve student understanding of the causes and process of the lunar phases. We implement this project with a sample of undergraduate, nonscience major students enrolled in a midsized public university located…

  3. Wake models developed during the Wind Shadow project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, S.; Ott, S.; Pena, A.; Berg, J.; Nielsen, M.; Rathmann, O.; Joergensen, H.

    2011-11-15

    The Wind Shadow project has developed and validated improved models for determining the wakes losses, and thereby the array efficiency of very large, closely packed wind farms. The rationale behind the project has been that the existing software has been covering these types of wind farms poorly, both with respect to the densely packed turbines and the large fetches needed to describe the collective shadow effects of one farm to the next. Further the project has developed the necessary software for the use of the models. Guidelines with recommendations for the use of the models are included in the model deliverables. The project has been carried out as a collaborative project between Risoe DTU, DONG, Vattenfall, DNV and VESTAS, and it has been financed by energinet.dk grant no. 10086. (Author)

  4. Final Project Report Load Modeling Transmission Research

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bravo, Richard [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Yinger, Robert [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Chassin, Dave [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Huang, Henry [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lu, Ning [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hiskens, Ian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Venkataramanan, Giri [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-03-31

    The research presented in this report primarily focuses on improving power system load models to better represent their impact on system behavior. The previous standard load model fails to capture the delayed voltage recovery events that are observed in the Southwest and elsewhere. These events are attributed to stalled air conditioner units after a fault. To gain a better understanding of their role in these events and to guide modeling efforts, typical air conditioner units were testing in laboratories. Using data obtained from these extensive tests, new load models were developed to match air conditioner behavior. An air conditioner model is incorporated in the new WECC composite load model. These models are used in dynamic studies of the West and can impact power transfer limits for California. Unit-level and systemlevel solutions are proposed as potential solutions to the delayed voltage recovery problem.

  5. HUD INFORMATION SYSTEMS: Immature Software Acquisition Capability Increases Project Risks

    National Research Council Canada - National Science Library

    2001-01-01

    .... GAO has designated HUD's major program areas as high risk, in part because the department's information and financial management systems were poorly integrated, ineffective, and generally unreliable...

  6. Lung cancer risk models from experimental animals

    International Nuclear Information System (INIS)

    Gilbert, E.S.

    1988-03-01

    The objective of this paper is to present analyses of data based on methods that adequately account for time-related factors and competiting risks, and that yield results that are expressed in a form comparable to results obtained from recent analyses of epidemiological studies of humans exposed to radon and radon daughters. These epidemiological analyses have modeled the hazard, or age-specific death rates, as a function of factors such as dose and dose rate, time from exposure, and time from cessation of exposure. The starting point for many of the analyses of human data has been the constant relative risk modeling which the age-specific death rates are assumed to be a function of cumulative dose, and the risks due to exposure are assumed to be proportional to the age-specific baseline death rates. However, departures from this initial model, such as dependence of risks on age at risk and/or time from exposure, have been investigated. These analyses have frequently been based on a non-parametric model that requires minimal assumptions regarding the baseline risks and their dependence on age

  7. Quantitative occupational risk model: Single hazard

    International Nuclear Information System (INIS)

    Papazoglou, I.A.; Aneziris, O.N.; Bellamy, L.J.; Ale, B.J.M.; Oh, J.

    2017-01-01

    A model for the quantification of occupational risk of a worker exposed to a single hazard is presented. The model connects the working conditions and worker behaviour to the probability of an accident resulting into one of three types of consequence: recoverable injury, permanent injury and death. Working conditions and safety barriers in place to reduce the likelihood of an accident are included. Logical connections are modelled through an influence diagram. Quantification of the model is based on two sources of information: a) number of accidents observed over a period of time and b) assessment of exposure data of activities and working conditions over the same period of time and the same working population. Effectiveness of risk reducing measures affecting the working conditions, worker behaviour and/or safety barriers can be quantified through the effect of these measures on occupational risk. - Highlights: • Quantification of occupational risk from a single hazard. • Influence diagram connects working conditions, worker behaviour and safety barriers. • Necessary data include the number of accidents and the total exposure of worker • Effectiveness of risk reducing measures is quantified through the impact on the risk • An example illustrates the methodology.

  8. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  9. Yield risks in global maize markets: Historical evidence and projections in key regions of the world

    Directory of Open Access Journals (Sweden)

    Nelson B. Villoria

    2018-03-01

    Full Text Available Simultaneous worldwide crop failures stemming from a more unstable climate may reduce the scope for international trade to compensate food shortages and stabilize food prices across the various regions of the world. Understanding the effects of changes in crop productivity on global markets requires knowledge about the extent to which crop yields may be systematically related across producing and consuming centers. This short communication contributes to this knowledge by investigating the potential changes in the strength of two key sources of supply risks in global maize markets: yield variance and cross-country yield correlation. We focus on the largest producing and consuming countries of the world. We capitalize on yield projections from the Global Gridded Crop Model Intercomparison project. Exploratory analysis of the skill of the underlying GGCMI models in reproducing key moments of the distribution of observed yields reveals that they overstate observed variances but faithfully reproduce observed patterns of cross-country correlations. We find no evidence of an increase in the degree of cross-country dependency of maize yields. We also find a higher incidence of what would be considered extremely low maize yields by present-time standards stemming from the projected downward trend in yields levels toward mid-century. The weak dependency of maize yields across countries, an the possibility of reducing the higher incidence of extremes through policies aimed to reverse the climate-induced downward trends in yields, suggest that international trade can become a valuable tool to ameliorate the effects of more unstable crop yields. Keywords: Extremely low yields, Maize markets, Food prices, Agricultural yields, Systemic risk in agriculture, Global agriculture, AgMIP, Global gridded crop model intercomparison

  10. Permafrost Degradation Risk Zone Assessment using Simulation Models

    DEFF Research Database (Denmark)

    Daanen, R.P.; Ingeman-Nielsen, Thomas; Marchenko, S.

    2011-01-01

    In this proof-of-concept study we focus on linking large scale climate and permafrost simulations to small scale engineering projects by bridging the gap between climate and permafrost sciences on the one hand and on the other technical recommendation for adaptation of planned infrastructures...... to climate change in a region generally underlain by permafrost. We present the current and future state of permafrost in Greenland as modelled numerically with the GIPL model driven by HIRHAM climate projections up to 2080. We develop a concept called Permafrost Thaw Potential (PTP), defined...... as the potential active layer increase due to climate warming and surface alterations. PTP is then used in a simple risk assessment procedure useful for engineering applications. The modelling shows that climate warming will result in continuing wide-spread permafrost warming and degradation in Greenland...

  11. Model dependencies of risk aversion and working interest estimates

    International Nuclear Information System (INIS)

    Lerche, I.

    1996-01-01

    Working interest, W, and risk adjusted value, RAV, are evaluated using both Cozzolino's formula for exponential dependence of risk aversion and also for a hyperbolic tangent dependence. In addition, the general method is given of constructing an RAV formula for any functional choice of risk aversion dependence. Two examples are given to illustrate how the model dependencies influence choices of working interest and risk adjusted value depending on whether the expected value of the project is positive or negative. In general the Cozzolino formula provides a more conservative position for risk than does the hyperbolic tangent formula, reflecting the difference in corporate attitudes to risk aversion. The commonly used Cozzolino formula is shown to have simple exact arithmetic expressions for maximum working interest and maximum RAV; the hyperbolic tangent formula has approximate analytic expressions. Both formulae also yield approximate analytical expressions for the working interest yielding a risk neutral RAV of zero. These arithmetic results are useful for making quick estimates of working interest ranges and risk adjusted values. (Author)

  12. Conceptual models for cumulative risk assessment.

    Science.gov (United States)

    Linder, Stephen H; Sexton, Ken

    2011-12-01

    In the absence of scientific consensus on an appropriate theoretical framework, cumulative risk assessment and related research have relied on speculative conceptual models. We argue for the importance of theoretical backing for such models and discuss 3 relevant theoretical frameworks, each supporting a distinctive "family" of models. Social determinant models postulate that unequal health outcomes are caused by structural inequalities; health disparity models envision social and contextual factors acting through individual behaviors and biological mechanisms; and multiple stressor models incorporate environmental agents, emphasizing the intermediary role of these and other stressors. The conclusion is that more careful reliance on established frameworks will lead directly to improvements in characterizing cumulative risk burdens and accounting for disproportionate adverse health effects.

  13. Rapid Energy Modeling Workflow Demonstration Project

    Science.gov (United States)

    2014-01-01

    app FormIt for conceptual modeling with further refinement available in Revit or Vasari. Modeling can also be done in Revit (detailed and conceptual...referenced building model while in the field. • Autodesk® Revit is a BIM software application with integrated energy and carbon analyses driven by Green...FormIt, Revit and Vasari, and (3) comparative analysis. The energy results of these building analyses are represented as annual energy use for natural

  14. Occupant Protection Data Mining and Modeling Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Current National Aeronautics and Space Administration (NASA) occupant protection standards and requirements are based on extrapolations of biodynamic models, which...

  15. Evaluating the Investment Benefit of Multinational Enterprises' International Projects Based on Risk Adjustment: Evidence from China

    Science.gov (United States)

    Chen, Chong

    2016-01-01

    This study examines the international risks faced by multinational enterprises to understand their impact on the evaluation of investment projects. Moreover, it establishes a 'three-dimensional' theoretical framework of risk identification to analyse the composition of international risk indicators of multinational enterprises based on the theory…

  16. Fuzzy logic model to quantify risk perception

    International Nuclear Information System (INIS)

    Bukh, Julia; Dickstein, Phineas

    2008-01-01

    The aim of this study is a quantification of public risk perception towards the nuclear field so as to be considered in decision making whenever the public involvement is sought. The proposed model includes both qualitative factors such as familiarity and voluntariness and numerical factors influencing risk perception, such as probability of occurrence and severity of consequence. Since part of these factors can be characterized only by qualitative expressions and the determination of them are linked with vagueness, imprecision and uncertainty, the most suitable method for the risk level assessment is Fuzzy Logic, which models qualitative aspects of knowledge and reasoning processes without employing precise quantitative analyses. This work, then, offers a Fuzzy-Logic based mean of representing the risk perception by a single numerical feature, which can be weighted and accounted for in decision making procedures. (author)

  17. Lifestyle-based risk model for fall risk assessment

    OpenAIRE

    Sannino, Giovanna; De Falco, Ivanoe; De Pietro, Guiseppe

    2016-01-01

    Purpose: The aim of this study was to identify the explicit relationship between life-style and the risk of falling under the form of a mathematical model. Starting from some personal and behavioral information of a subject as, e.g., weight, height, age, data about physical activity habits, and concern about falling, the model would estimate the score of her/his Mini-Balance Evaluation Systems (Mini-BES) test. This score ranges within 0 and 28, and the lower its value the more likely the subj...

  18. A decision model for E and P petroleum projects using real options and preference theory

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Gabriel A.C. [Universidade Estadual de Campinas, SP (Brazil). Inst. de Geociencias. Lab. de Analise Geoconomica (LAGE); Suslick, Saul B. [Universidade Estadual de Campinas, SP (Brazil). Inst. de Geociencias. Centro de Estudo do Petroleo; Nepomuceno Filho, Francisco [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The results from Discounted Cash Flow (DCF) are limited as a tool for decision-making in the petroleum industry because they do not properly take into account three important features of the modern investments: uncertainty, irreversibility, timing and corporation's risk-aversion. Recent developments in real options and preference theories have allowed decision-makers to employ these two approaches separately in the process of valuation and decision-making of risky projects. This paper presents a model for valuation and decision-making integrating discounted cash flow, real options and reference theory. This model seems to be suitable to answer to the following questions: what is the current value of an oil project? what is the optimal working interest in this project venture?; what is criteria to select projects considering investment irreversibility, uncertainty and timing to implement decisions? This model is applied to valuation and decision-making of a project to produce oil from a deep-water reservoir and its results are compared to those of the traditional approach. NPV model suggest that, as the project value is above its investment cost, the corporation should invest immediately and take 100% working interest in the project. Contrarily, the integrated model suggest the corporation should invest as long as project current value is as large as 1.85 times investment cost and should take only 44.38% working interest, whereas partners fund and acquire the remaining 55,62% of the project. In general, results indicate that NPV tend to pay more attention on return and does not account properly for risk. Then, as the uncertainty or volatile of strategic variables increases, the two models give more divergent results. (author)

  19. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    Directory of Open Access Journals (Sweden)

    Voytolovskiy Nikolay

    2017-01-01

    Full Text Available This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment project risks were specified on the basis of interconnection of risk and project effectiveness. Risk management procedure at realization of the developer project was developed.

  20. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  1. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    International Nuclear Information System (INIS)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun

    2014-01-01

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  2. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  3. Development of generic key performance indicators for PMBOK® using a 3D project integration model

    Directory of Open Access Journals (Sweden)

    Craig Langston

    2013-12-01

    Full Text Available Since Martin Barnes’ so-called ‘iron triangle’ circa 1969, much debate has occurred over how best to describe the fundamental constraints that underpin project success. This paper develops a 3D project integration model for PMBOK® comprising core constraints of scope, cost, time and risk as a basis to propose six generic key performance indicators (KPIs that articulate successful project delivery. These KPIs are defined as value, efficiency, speed, innovation, complexity and impact and can each be measured objectively as ratios of the core constraints. An overall KPI (denoted as s3/ctr is also derived. The aim in this paper is to set out the case for such a model and to demonstrate how it can be employed to assess the performance of project teams in delivering successful outcomes at various stages in the project life cycle. As part of the model’s development, a new PMBOK® knowledge area concerning environmental management is advanced.

  4. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  5. Leading Undergraduate Research Projects in Mathematical Modeling

    Science.gov (United States)

    Seshaiyer, Padmanabhan

    2017-01-01

    In this article, we provide some useful perspectives and experiences in mentoring students in undergraduate research (UR) in mathematical modeling using differential equations. To engage students in this topic, we present a systematic approach to the creation of rich problems from real-world phenomena; present mathematical models that are derived…

  6. Radiative-convective equilibrium model intercomparison project

    Science.gov (United States)

    Wing, Allison A.; Reed, Kevin A.; Satoh, Masaki; Stevens, Bjorn; Bony, Sandrine; Ohno, Tomoki

    2018-03-01

    RCEMIP, an intercomparison of multiple types of models configured in radiative-convective equilibrium (RCE), is proposed. RCE is an idealization of the climate system in which there is a balance between radiative cooling of the atmosphere and heating by convection. The scientific objectives of RCEMIP are three-fold. First, clouds and climate sensitivity will be investigated in the RCE setting. This includes determining how cloud fraction changes with warming and the role of self-aggregation of convection in climate sensitivity. Second, RCEMIP will quantify the dependence of the degree of convective aggregation and tropical circulation regimes on temperature. Finally, by providing a common baseline, RCEMIP will allow the robustness of the RCE state across the spectrum of models to be assessed, which is essential for interpreting the results found regarding clouds, climate sensitivity, and aggregation, and more generally, determining which features of tropical climate a RCE framework is useful for. A novel aspect and major advantage of RCEMIP is the accessibility of the RCE framework to a variety of models, including cloud-resolving models, general circulation models, global cloud-resolving models, single-column models, and large-eddy simulation models.

  7. A prospective radiological risk assessment for a phosphate industry project

    Energy Technology Data Exchange (ETDEWEB)

    Lauria, Dejanira C.; Reis, Rocio G., E-mail: dejanira@ird.gov.br, E-mail: rocio@ird.gov.br

    2012-07-01

    The Santa Quiteria Project is the major Brazilian uranium mine project, nowadays. A peculiarity of this project is the association of uranium with phosphate and the mining and processing of both by two different enterprises. A private company will be responsible for the production of phosphoric acid and a state owned company will be responsible for the production of yellow cake. At full capacity, the facility will generate 10% of Brazil's total annual phosphoric acid production and 1,500 tons of yellow cake per year. The processing by which phosphoric acid is produced generates phosphogypsum (PG) as a by-product. The ratio of phosphogypsum to phosphoric acid is around 5 to 1. After all the phosphate has been extracted and processed, it is expected that some 37 million tons of phosphogypsum with 13 Bq/g of {sup 226}Ra will be produced. A prospective generic assessment was carried out for evaluating the potential radioactive impact of this PG stack on the workers and surrounding inhabitants. Two hypothetical farmer scenarios were designed to estimate the potential dose out of the project boundary and over the stack piles, after the shutdown of the project. The annual exposure dose of workers was also evaluated. As a result, the potential public and worker doses exceeded the adopted level of doses of 1mSv.y{sup -1} and 6 mSv.y{sup -1}, respectively. The simulation spotlighted the importance of the rainfall erosion index, and consequently the stack shape for the environmental contamination. The importance of planning the decommissioning of the facility still in the planning phase of the project to give support for the feasibility studies was also highlighter. Although quite conservative, the prospective assessing of dose herein is useful to aware and guide the decision makers on information and data survey and taking avoiding action to protect the health, by changing the project in some way. (author)

  8. Technology Investments in the NASA Entry Systems Modeling Project

    Science.gov (United States)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  9. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  10. Can model weighting improve probabilistic projections of climate change?

    Energy Technology Data Exchange (ETDEWEB)

    Raeisaenen, Jouni; Ylhaeisi, Jussi S. [Department of Physics, P.O. Box 48, University of Helsinki (Finland)

    2012-10-15

    Recently, Raeisaenen and co-authors proposed a weighting scheme in which the relationship between observable climate and climate change within a multi-model ensemble determines to what extent agreement with observations affects model weights in climate change projection. Within the Third Coupled Model Intercomparison Project (CMIP3) dataset, this scheme slightly improved the cross-validated accuracy of deterministic projections of temperature change. Here the same scheme is applied to probabilistic temperature change projection, under the strong limiting assumption that the CMIP3 ensemble spans the actual modeling uncertainty. Cross-validation suggests that probabilistic temperature change projections may also be improved by this weighting scheme. However, the improvement relative to uniform weighting is smaller in the tail-sensitive logarithmic score than in the continuous ranked probability score. The impact of the weighting on projection of real-world twenty-first century temperature change is modest in most parts of the world. However, in some areas mainly over the high-latitude oceans, the mean of the distribution is substantially changed and/or the distribution is considerably narrowed. The weights of individual models vary strongly with location, so that a model that receives nearly zero weight in some area may still get a large weight elsewhere. Although the details of this variation are method-specific, it suggests that the relative strengths of different models may be difficult to harness by weighting schemes that use spatially uniform model weights. (orig.)

  11. National Automated Highway System Consortium: Modeling Stakeholder Preferences Project

    OpenAIRE

    Lathrop, John; Chen, Kan

    1997-01-01

    This document is the final report of the Modeling Stakeholder Preferences Project. The results of the project consist of three results: 1) evaluation framework; 2) focus group non-quantitative findings/ recommendations; and, 3) performance/impact measures, their endpoints, rankings and weights, for each stakeholder group.

  12. Improving Project Management Using Formal Models and Architectures

    Science.gov (United States)

    Kahn, Theodore; Sturken, Ian

    2011-01-01

    This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.

  13. A whole stand basal area projection model for Appalachian hardwoods

    Science.gov (United States)

    John R. Brooks; Lichun Jiang; Matthew Perkowski; Benktesh Sharma

    2008-01-01

    Two whole-stand basal area projection models were developed for Appalachian hardwood stands. The proposed equations are an algebraic difference projection form based on existing basal area and the change in age, trees per acre, and/or dominant height. Average equation error was less than 10 square feet per acre and residuals exhibited no irregular trends.

  14. Building Context with Tumor Growth Modeling Projects in Differential Equations

    Science.gov (United States)

    Beier, Julie C.; Gevertz, Jana L.; Howard, Keith E.

    2015-01-01

    The use of modeling projects serves to integrate, reinforce, and extend student knowledge. Here we present two projects related to tumor growth appropriate for a first course in differential equations. They illustrate the use of problem-based learning to reinforce and extend course content via a writing or research experience. Here we discuss…

  15. Network model of project "Lean Production"

    Science.gov (United States)

    Khisamova, E. D.

    2018-05-01

    Economical production implies primarily new approaches to culture of management and organization of production and offers a set of tools and techniques that allows reducing losses significantly and making the process cheaper and faster. Economical production tools are simple solutions that allow one to see opportunities for improvement of all aspects of the business, to reduce losses significantly, to constantly improve the whole spectrum of business processes, to increase significantly the transparency and manageability of the organization, to take advantage of the potential of each employee of the company, to increase competitiveness, and to obtain significant economic benefits without making large financial expenditures. Each of economical production tools solves a specific part of the problems, and only application of their combination will allow one to solve the problem or minimize it to acceptable values. The research of the governance process project "Lean Production" permitted studying the methods and tools of lean production and developing measures for their improvement.

  16. EC FP6 Siberia-focused Enviro-RISKS Project and its Outcomes

    Science.gov (United States)

    Baklanov, A. A.; Gordov, E. P.

    2009-04-01

    The FP6 Project "Man-induced Environmental Risks: Monitoring, Management and Remediation of Man-made Changes in Siberia" (Enviro-RISKS) strategic objective is to facilitate elaboration of solid scientific background and understanding of man-made associated environmental risks, their influence on all aspects of regional environment and optimal ways for it remediation by means of coordinated initiatives of a range of relevant RTD projects as well as to achieve their improved integration thus giving the projects additional synergy in current activities and potential for practical applications. List of Partners includes 3 leading European research organizations, 6 leading Russian research organizations (5 - located in Siberia) and 1 organization from Kazakhstan. Additionally several Russian and European research organizations joined to the Project as Associated Partners. Scientific background and foundation for the project performance is formed by a number of different levels RTD projects carried out by Partners and devoted to near all aspects of the theme. The set comprise coordinated/performed by partners EC funded thematic international projects, Russian national projects and other projects performed by NIS partners. Project outcomes include, in particular, development and support of the bilingual Enviro-RISKS web portal (http://risks.scert.ru/) as the major tool for disseminations of environmental information and project results; achieved level of development of Siberia Integrated Regional Study (SIRS, http://sirs.scert.ru/), which is the Siberia-focused NEESPI Environmental Mega-Project ongoing under the auspices of the Siberian Branch of the Russian Academy of Sciences. The main Project outcome are Memorandum on the state of the art of environmental RTD activity in Siberia and Recommendations on future environmental RTD activity in Siberia elaborated by four Working Experts Groups working in most important for Siberia Thematic Focuses. Three Thematic Focuses

  17. MARR project risk matrices in radiotherapy; Proyecto MARR: matrices de riesgo en radioterapia

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez, M. L.; Perez Mulas, A.; Vilanova, J.; Prieto, C.; Delgado, J. M.; Alvarez, C.; Rodriguez, M.

    2014-07-01

    Radiotherapy is a complex process not without risk for the patient. The Council de Nuclear Safety (CSN), based on its cooperation with the health authorities regarding radiation protection of patient is promoting, through the project MARR, (Risk matrix in radiotherapy) the risk analysis in the radiotherapy departments of our country. This project represents the extension of methodologies applied in the nuclear sector other radiological practices. The aim is to share, with professional societies, the knowledge acquired by the CSN during its participation in the Ibero-American Forum of regulators (Forum) projects. (Author)

  18. Risk Measurement and Risk Modelling Using Applications of Vine Copulas

    Directory of Open Access Journals (Sweden)

    David E. Allen

    2017-09-01

    Full Text Available This paper features an application of Regular Vine copulas which are a novel and recently developed statistical and mathematical tool which can be applied in the assessment of composite financial risk. Copula-based dependence modelling is a popular tool in financial applications, but is usually applied to pairs of securities. By contrast, Vine copulas provide greater flexibility and permit the modelling of complex dependency patterns using the rich variety of bivariate copulas which may be arranged and analysed in a tree structure to explore multiple dependencies. The paper features the use of Regular Vine copulas in an analysis of the co-dependencies of 10 major European Stock Markets, as represented by individual market indices and the composite STOXX 50 index. The sample runs from 2005 to the end of 2013 to permit an exploration of how correlations change indifferent economic circumstances using three different sample periods: pre-GFC (January 2005–July 2007, GFC (July 2007– September 2009, and post-GFC periods (September 2009–December 2013. The empirical results suggest that the dependencies change in a complex manner, and are subject to change in different economic circumstances. One of the attractions of this approach to risk modelling is the flexibility in the choice of distributions used to model co-dependencies. The practical application of Regular Vine metrics is demonstrated via an example of the calculation of the VaR of a portfolio made up of the indices.

  19. OPPORTUNITIES AND RISKS IN A CONTROL SYSTEM OF INNOVATIVE PROJECTS OF ORGANIZATIONAL DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    A.V. Grebenkin

    2008-06-01

    Full Text Available The definition of the organizational development innovative project and the technique of its estimation is in this article offered. The distinctive special feature of this method is comparison of opportunities and risks by means of essentially new system of the parameters. These parameters allow to receive a complex estimation of a condition of organizational development innovative projects. Approbation of the offered estimated technique has been lead on set of organizational development innovative projects which were realized at the enterprises of a various branch accessory. The hypothesis about necessity of definition of a condition of the project by means of an estimation of opportunities and their comparisons to risks is confirmed.

  20. Natural risks assessment and management (project of monograph)

    International Nuclear Information System (INIS)

    Ragozin, A.L.

    1998-01-01

    Full text of publication follows: large-scale theoretic and practical works on the issue of natural risk assessment and management started in Russia in the end of the 80's. By now there has been made a considerable progress, which allowed for the preparation of a collective monograph on the subject mentioned in the title of this abstract. It is supposed to be published in 1999 in order to become a Russian contribution to the International Decade of Natural Disasters Reduction. The monograph included 6 chapters with the following titles: 1. Methodological foundations of natural risk analysis and assessment. 2. Investigating and forecasting natural hazards for the purpose of risk assessment. 3. Assessment of economic, social and ecological damage from natural hazards. 4, Theory of natural risk assessment. 5. Examples of natural risk assessment and mapping. 6. Natural risk management. In the report there is described the content of the monograph and unsolved questions are discussed. Executive editor offers all international experts to cooperate in the compilation of this monograph, which is to be completed by the end of 1998, especially of chapter 5 and 6. (author)

  1. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  2. Economic–Environmental Sustainability in Building Projects: Introducing Risk and Uncertainty in LCCE and LCCA

    Directory of Open Access Journals (Sweden)

    Elena Fregonara

    2018-06-01

    Full Text Available The aim of this paper is to propose a methodology for supporting decision-making in the design stages of new buildings or in the retrofitting of existing heritages. The focus is on the evaluation of economic–environmental sustainability, considering the presence of risk and uncertainty. An application of risk analysis in conjunction with Life-Cycle Cost Analysis (LCCA is proposed for selecting the preferable solution between technological options, which represents a recent and poorly explored context of analysis. It is assumed that there is a presence of uncertainty in cost estimating, in terms of the Life-Cycle Cost Estimates (LCCEs and uncertainty in the technical performance of the life-cycle cost analysis. According to the probability analysis, which was solved through stochastic simulation and the Monte Carlo Method (MCM, risk and uncertainty are modeled as stochastic variables or as “stochastic relevant cost drivers”. Coherently, the economic–financial and energy–environmental sustainability is analyzed through the calculation of a conjoint “economic–environmental indicator”, in terms of the stochastic global cost. A case study of the multifunctional building glass façade project in Northern Italy is proposed. The application demonstrates that introducing flexibility into the input data and the duration of the service lives of components and the economic and environmental behavior of alternative scenarios can lead to opposite results compared to a deterministic analysis. The results give full evidence of the environmental variables’ capacity to significantly perturb the model output.

  3. The Symbiose project: an integrated framework for performing environmental radiological risk assessment

    International Nuclear Information System (INIS)

    Gonze, M.A.; Mourlon, C.; Garcia-Sanchez, L.; Beaugelin, K.; Chen, T.; Le Dizes, S.

    2004-01-01

    Human health and ecological risk assessments usually require the integration of a wide range of environmental data and modelling approaches, with a varying level of detail dependent on the management objectives, the complexity of the site and the level of ignorance about the pollutant behaviour/toxicity. Like most scientists and assessors did it recently, we recognized the need for developing comprehensive, integrated and flexible approaches to risk assessment. To meet these needs, IRSN launched the Symbiose project (2002-2006) which aims first, at designing a framework for integrating and managing data, methods and knowledge of some relevance in radiological risk to humans/biota assessment studies, and second, at implementing this framework in an information management, modelling and calculation platform. Feasibility developments (currently completed) led to the specification of a fully integrated, object-oriented and hierarchical approach for describing the fate, transport and effect of radionuclides in spatially-distributed environmental systems. This innovative approach has then been implemented in a platform prototype, main components of which are a user-friendly and modular simulation environment (e.g. using GoldSim toolbox), and a hierarchical object-oriented biosphere database. Both conceptual and technical developments will be presented here. (author)

  4. The New York High-Risk Project: social and general intelligence in children at risk for schizophrenia.

    Science.gov (United States)

    Ott, S L; Spinelli, S; Rock, D; Roberts, S; Amminger, G P; Erlenmeyer-Kimling, L

    1998-05-04

    Social deficits, as well as low performance on intelligence tests, are known early symptoms of schizophrenia. We studied whether impairment of social intelligence can be detected before the outbreak of the disorder. In the New York High-Risk Project, children at risk for schizophrenia (HRSz) or affective disorder (HRAff) and a normal control group (NC) were studied over the past 26 years. The children are now in mid-adulthood, with known psychiatric outcomes. Developmental and clinical data from childhood can now be related to adulthood diagnoses. We compared mean WISC (or WISC-R) and WAIS (or WAIS-R) scores from childhood and adolescence, and change of IQ, between the risk groups, as well as between the adulthood outcomes. We were specifically interested in the development of social intelligence (the Picture Arrangement and Comprehension subtests). We used logistic regression analyses to generate a model predicting adulthood schizophrenia. IQ at age 9,7 was lower in children with HRSz than with HRAff. Adulthood schizophrenia, compared with major depressive disorder and no psychiatric diagnosis could not be related conclusively to low IQ. This may be a result of the study design, since children with IQ below 70 or behavioral problems were not eligible as study subjects. There was no evidence of lower scores or more decline in social intelligence related to age or group membership (risk or outcome). Subtest-Scatter, a nondirectional measure of the differences between all subtests and Vocabulary, reflecting a lesser difference between crystallized and fluid intelligence, was identified as a significant predictor of adulthood schizophrenia, in the whole group as well as in the HRSz group alone.

  5. Low Dose Radiation Cancer Risks: Epidemiological and Toxicological Models

    Energy Technology Data Exchange (ETDEWEB)

    David G. Hoel, PhD

    2012-04-19

    The basic purpose of this one year research grant was to extend the two stage clonal expansion model (TSCE) of carcinogenesis to exposures other than the usual single acute exposure. The two-stage clonal expansion model of carcinogenesis incorporates the biological process of carcinogenesis, which involves two mutations and the clonal proliferation of the intermediate cells, in a stochastic, mathematical way. The current TSCE model serves a general purpose of acute exposure models but requires numerical computation of both the survival and hazard functions. The primary objective of this research project was to develop the analytical expressions for the survival function and the hazard function of the occurrence of the first cancer cell for acute, continuous and multiple exposure cases within the framework of the piece-wise constant parameter two-stage clonal expansion model of carcinogenesis. For acute exposure and multiple exposures of acute series, it is either only allowed to have the first mutation rate vary with the dose, or to have all the parameters be dose dependent; for multiple exposures of continuous exposures, all the parameters are allowed to vary with the dose. With these analytical functions, it becomes easy to evaluate the risks of cancer and allows one to deal with the various exposure patterns in cancer risk assessment. A second objective was to apply the TSCE model with varing continuous exposures from the cancer studies of inhaled plutonium in beagle dogs. Using step functions to estimate the retention functions of the pulmonary exposure of plutonium the multiple exposure versions of the TSCE model was to be used to estimate the beagle dog lung cancer risks. The mathematical equations of the multiple exposure versions of the TSCE model were developed. A draft manuscript which is attached provides the results of this mathematical work. The application work using the beagle dog data from plutonium exposure has not been completed due to the fact

  6. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  7. Radarsat Antarctic Mapping Project Digital Elevation Model, Version 2

    Data.gov (United States)

    National Aeronautics and Space Administration — The high-resolution Radarsat Antarctic Mapping Project (RAMP) Digital Elevation Model (DEM) combines topographic data from a variety of sources to provide consistent...

  8. Procedures and models for estimating preconstruction costs of highway projects.

    Science.gov (United States)

    2012-07-01

    This study presents data driven and component based PE cost prediction models by utilizing critical factors retrieved from ten years of historical project data obtained from ODOT roadway division. The study used factor analysis of covariance and corr...

  9. MODELLING OF FINANCIAL EFFECTIVENESS AND COMPARATIVE ANALYSIS OF PUBLIC-PRIVATE PARTNERSHIP PROJECTS AND PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Kuznetsov Aleksey Alekseevich

    2017-10-01

    Full Text Available The article substantiates the necessity of extension and development of tools for methodological evaluation of effectiveness of public-private partnership (PPP projects both individually and in comparison of effectiveness of various mechanisms of projects realization on the example of traditional public procurement. The author proposed an original technique of modelling cash flows of private and public partners when realizing the projects based on PPP and on public procurement. The model enables us promptly and with sufficient accuracy to reveal comparative advantages of project forms of PPP and public procurement, and also assess financial effectiveness of the PPP projects for each partner. The modelling is relatively straightforward and reliable. The model also enables us to evaluate public partner's expenses for availability, find the terms and thresholds for interest rates of financing attracted by the partners and for risk probabilities to ensure comparative advantage of PPP project. Proposed criteria of effectiveness are compared with methodological recommendations provided by the Ministry of Economic Development of the Russian Federation. Subject: public and private organizations, financial institutions, development institutions and their theoretical and practical techniques for effectiveness evaluation of public-private partnership (PPP projects. Complexity of effectiveness evaluation and the lack of unified and accepted methodology are among the factors that limit the development of PPP in the Russian Federation nowadays. Research objectives: development of methodological methods for assessing financial efficiency of PPP projects by creating and justifying application of new principles and methods of modelling, and also criteria for effectiveness of PPP projects both individually and in comparison with the public procurement. Materials and methods: open database of ongoing PPP projects in the Russian Federation and abroad was used. The

  10. Canadian Cancer Risk Management Model: evaluation of cancer control.

    Science.gov (United States)

    Evans, William K; Wolfson, Michael C; Flanagan, William M; Shin, Janey; Goffin, John; Miller, Anthony B; Asakawa, Keiko; Earle, Craig; Mittmann, Nicole; Fairclough, Lee; Oderkirk, Jillian; Finès, Philippe; Gribble, Stephen; Hoch, Jeffrey; Hicks, Chantal; Omariba, D Walter R; Ng, Edward

    2013-04-01

    The aim of this study was to develop a decision support tool to assess the potential benefits and costs of new healthcare interventions. The Canadian Partnership Against Cancer (CPAC) commissioned the development of a Cancer Risk Management Model (CRMM)--a computer microsimulation model that simulates individual lives one at a time, from birth to death, taking account of Canadian demographic and labor force characteristics, risk factor exposures, and health histories. Information from all the simulated lives is combined to produce aggregate measures of health outcomes for the population or for particular subpopulations. The CRMM can project the population health and economic impacts of cancer control programs in Canada and the impacts of major risk factors, cancer prevention, and screening programs and new cancer treatments on population health and costs to the healthcare system. It estimates both the direct costs of medical care, as well as lost earnings and impacts on tax revenues. The lung and colorectal modules are available through the CPAC Web site (www.cancerview.ca/cancerrriskmanagement) to registered users where structured scenarios can be explored for their projected impacts. Advanced users will be able to specify new scenarios or change existing modules by varying input parameters or by accessing open source code. Model development is now being extended to cervical and breast cancers.

  11. Deciphering priority areas for improving project risk management ...

    African Journals Online (AJOL)

    unethical practices contributing to poor project delivery in the ZCI,. Mukumbwa and Muya .... Egypt, Ghana, India, Indonesia, Jordan, Malaysia, Mozambique,. Nigeria, Pakistan ..... The analysis is based on the Pareto principle, also known as the 80/20 .... poor interpretation of contract; poor safety on site; disputes; high taxes;.

  12. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    OpenAIRE

    Özlem Tüz; Şafak Ebesek

    2013-01-01

    Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of th...

  13. DEVELOPMENT MODEL OF PATISSERIE PROJECT-BASED LEARNING

    OpenAIRE

    Ana Ana; Lutfhiyah Nurlaela

    2013-01-01

    The study aims to find a model of patisserie project-based learning with production approach that can improve effectiveness of patisserie learning. Delphi Technique, Cohen's Kappa and percentages of agreements were used to assess model of patisserie project based learning. Data collection techniques employed in the study were questionnaire, check list worksheet, observation, and interview sheets. Subjects were 13 lectures of expertise food and nutrition and 91 students of Food and Nutrition ...

  14. Numerical modeling in photonic crystals integrated technology: the COPERNICUS Project

    DEFF Research Database (Denmark)

    Malaguti, Stefania; Armaroli, Andrea; Bellanca, Gaetano

    2011-01-01

    Photonic crystals will play a fundamental role in the future of optical communications. The relevance of the numerical modeling for the success of this technology is assessed by using some examples concerning the experience of the COPERNICUS Project.......Photonic crystals will play a fundamental role in the future of optical communications. The relevance of the numerical modeling for the success of this technology is assessed by using some examples concerning the experience of the COPERNICUS Project....

  15. Downplaying model power in IT project work

    DEFF Research Database (Denmark)

    Richter, Anne; Buhl, Henrik

    2004-01-01

    in the research, presented in this article, conducted in a Danish manufacturing company, is how an IT system could be configured to support shopfloor teamwork and enhance the quality of work. The approach is based on participatory design and the concept of "model power". This concept facilitates an understanding...

  16. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  17. The CAREM-25 project from the risk point of view

    International Nuclear Information System (INIS)

    Baron, J.H.

    1998-01-01

    The future use of the nuclear energy for electricity production is considered a possible alternative, mainly taking into account the high environmental impact of the fossil fuel alternatives (greenhouse effect, acid rain). In a worldwide context, however, it is desirable for the new nuclear power plants to be safer than the present ones. To demonstrate the safety level of a nuclear installation, the Risk Analysis (in fact, Probabilistic Safety Analysis) is an adequate tool, as it allows for the risk level quantification. The risk itself is composed of two factors, the first takes into account the probability associated with accidental sequences that release radioactive materials, the second takes into account the amount and consequences of such a release. In the present work, the reduction of both factors is faced, the probability by using simpler safety systems (inherently safe systems), and the consequence by using small power production units, that have, besides, passive mitigation systems and long response times. The work is illustrated with a risk comparison for electricity production via CAREM-25 units, against via a classic design unit (Atucha II). The results are base in Probabilistic Safety Studies performed for both installations. The conclusions show an effective risk reduction (both in probability and in consequence), reaching the point where in no case acute irradiation effects are predicted in the vicinity of the accidented plant. (author) [es

  18. Risk identification for PPP waste-to-energy incineration projects in China

    International Nuclear Information System (INIS)

    Song, Jinbo; Song, Danrong; Zhang, Xueqing; Sun, Yan

    2013-01-01

    Municipal solid waste (MSW) is regarded as a renewable energy source. In China, the sharp increase of MSW has precipitated the rapid growth of waste-to-energy (WTE) incineration plants. Private capital has been getting into the WTE incineration industry through the public–private partnership (PPP) arrangement. Due to the large construction cost and the long concession period commonly associated with this arrangement, a number of failures have emerged in PPP WTE incineration projects. The aim of this paper is to investigate the key risks of PPP WTE incineration projects in China and study the strategies for managing these risks by drawing experience and learning lessons from these projects. First, we analyzed the MSW management practices, relevant legislations and policies, and the development of PPP WTE incineration projects in China. Second, we identified ten key risks through interviews, surveys and visits to some selected projects, and provided detailed analysis of these risks. Lastly, we developed response strategies for these risks from the perspectives of both public and private sectors. - Highlights: • We analyze MSW management practices, relevant legislations and policies in China. • Through case study on PPP WTE incineration projects, ten key risks are identified. • Response strategies for key risks are developed

  19. Modeling operational risks of the nuclear industry with Bayesian networks

    International Nuclear Information System (INIS)

    Wieland, Patricia; Lustosa, Leonardo J.

    2009-01-01

    Basically, planning a new industrial plant requires information on the industrial management, regulations, site selection, definition of initial and planned capacity, and on the estimation of the potential demand. However, this is far from enough to assure the success of an industrial enterprise. Unexpected and extremely damaging events may occur that deviates from the original plan. The so-called operational risks are not only in the system, equipment, process or human (technical or managerial) failures. They are also in intentional events such as frauds and sabotage, or extreme events like terrorist attacks or radiological accidents and even on public reaction to perceived environmental or future generation impacts. For the nuclear industry, it is a challenge to identify and to assess the operational risks and their various sources. Early identification of operational risks can help in preparing contingency plans, to delay the decision to invest or to approve a project that can, at an extreme, affect the public perception of the nuclear energy. A major problem in modeling operational risk losses is the lack of internal data that are essential, for example, to apply the loss distribution approach. As an alternative, methods that consider qualitative and subjective information can be applied, for example, fuzzy logic, neural networks, system dynamic or Bayesian networks. An advantage of applying Bayesian networks to model operational risk is the possibility to include expert opinions and variables of interest, to structure the model via causal dependencies among these variables, and to specify subjective prior and conditional probabilities distributions at each step or network node. This paper suggests a classification of operational risks in industry and discusses the benefits and obstacles of the Bayesian networks approach to model those risks. (author)

  20. Modeling operational risks of the nuclear industry with Bayesian networks

    Energy Technology Data Exchange (ETDEWEB)

    Wieland, Patricia [Pontificia Univ. Catolica do Rio de Janeiro (PUC-Rio), RJ (Brazil). Dept. de Engenharia Industrial; Comissao Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil)], e-mail: pwieland@cnen.gov.br; Lustosa, Leonardo J. [Pontificia Univ. Catolica do Rio de Janeiro (PUC-Rio), RJ (Brazil). Dept. de Engenharia Industrial], e-mail: ljl@puc-rio.br

    2009-07-01

    Basically, planning a new industrial plant requires information on the industrial management, regulations, site selection, definition of initial and planned capacity, and on the estimation of the potential demand. However, this is far from enough to assure the success of an industrial enterprise. Unexpected and extremely damaging events may occur that deviates from the original plan. The so-called operational risks are not only in the system, equipment, process or human (technical or managerial) failures. They are also in intentional events such as frauds and sabotage, or extreme events like terrorist attacks or radiological accidents and even on public reaction to perceived environmental or future generation impacts. For the nuclear industry, it is a challenge to identify and to assess the operational risks and their various sources. Early identification of operational risks can help in preparing contingency plans, to delay the decision to invest or to approve a project that can, at an extreme, affect the public perception of the nuclear energy. A major problem in modeling operational risk losses is the lack of internal data that are essential, for example, to apply the loss distribution approach. As an alternative, methods that consider qualitative and subjective information can be applied, for example, fuzzy logic, neural networks, system dynamic or Bayesian networks. An advantage of applying Bayesian networks to model operational risk is the possibility to include expert opinions and variables of interest, to structure the model via causal dependencies among these variables, and to specify subjective prior and conditional probabilities distributions at each step or network node. This paper suggests a classification of operational risks in industry and discusses the benefits and obstacles of the Bayesian networks approach to model those risks. (author)