WorldWideScience

Sample records for risk monitoring program

  1. Risk monitor - a tool for operational safety assessment risk monitor - user's manual

    International Nuclear Information System (INIS)

    Hari Prasad, M.; Vinod, Gopika; Saraf, R.K.; Ghosh, A.K.

    2006-06-01

    Probabilistic Safety Assessment has become a key tool as on today to identify and understand Nuclear Power Plant vulnerabilities. As a result of the availability of these PSA studies, there is a desire to use them to enhance plant safety and to operate the nuclear stations in the most efficient manner. Risk Monitor is a PC based tool, which computes the real time safety level and assists plant personnel to manage day-to-day activities. Risk Monitor is a PC based user friendly software tool used for modification and re-analysis of a nuclear Power plant. Operation of Risk Monitor is based on PSA methods for assisting in day to day applications. Risk Monitoring programs can assess the risk profile and are used to optimize the operation of Nuclear Power Plants with respect to a minimum risk level over the operating time. This report presents the background activities of Risk Monitor, its application areas and the step by step procedure for the user.to interact with the software. This software can be used with the PSA model of any Nuclear Power Plant. (author)

  2. 24 CFR 266.520 - Program monitoring and compliance.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  3. Ground-Water Protection and Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P.E.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the ground-water protection and monitoring program strategy for the Hanford Site in 1994. Two of the key elements of this strategy are to (1) protect the unconfined aquifer from further contamination, and (2) conduct a monitoring program to provide early warning when contamination of ground water does occur. The monitoring program at Hanford is designed to document the distribution and movement of existing ground-water contamination and provides a historical baseline for evaluating current and future risk from exposure to the contamination and for deciding on remedial action options.

  4. Ground-Water Protection and Monitoring Program

    International Nuclear Information System (INIS)

    Dresel, P.E.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the ground-water protection and monitoring program strategy for the Hanford Site in 1994. Two of the key elements of this strategy are to (1) protect the unconfined aquifer from further contamination, and (2) conduct a monitoring program to provide early warning when contamination of ground water does occur. The monitoring program at Hanford is designed to document the distribution and movement of existing ground-water contamination and provides a historical baseline for evaluating current and future risk from exposure to the contamination and for deciding on remedial action options

  5. Rapid changes in small fish mercury concentrations in estuarine wetlands: Implications for wildlife risk and monitoring programs

    Science.gov (United States)

    Eagles-Smith, Collin A.; Ackerman, Joshua T.

    2009-01-01

    Small fish are commonly used to assess mercury (Hg) risk to wildlife and monitor Hg in wetlands. However, limited research has evaluated short-term Hg variability in small fish, which can have important implications for monitoring programs and risk assessment. We conducted a time-series study of Hg concentrations in two small fish species representing benthic (longjaw mudsuckers [Gillichthys mirabilis]) and pelagic (threespine sticklebacks [Gasterosteus aculeatus]) food-webs within three wetland habitats in San Francisco Bay Estuary. We simultaneously monitored prey deliveries, nest initiation, and chick hatching dates of breeding Forster's terns (Sterna forsteri), the most abundant nesting piscivore in the region. Mudsuckers and sticklebacks were the predominant prey fish, comprising 36% and 25% of tern diet, and Hg concentrations averaged (geometric mean ?? SE, ??g/g dw) 0.44 ?? 0.01 and 0.68 ?? 0.03, respectively. Fish Hg concentrations varied substantially over time following a quadratic form in both species, increasing 40% between March and May then decreasing 40% between May and July. Importantly, Forster's terns initiated 68% of nests and 31% of chicks hatched during the period of peak Hg concentrations in prey fish. These results illustrate the importance of short-term temporal variation in small fish Hg concentrations for both Hg monitoring programs and assessing wildlife risk.

  6. A risk-based approach to liquid effluent monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Hull, L.C.

    1995-10-01

    DOE Order 5400.1 identifies six objectives of a liquid effluent monitoring program. A strategy is proposed that meets these objective in one of two ways: (1) by showing that effluent concentrations are below concentration limits set by permits or are below concentrations that could cause environmental problems or (2) by showing that concentrations in effluent have not changed from a period when treatment processes were in control and there were no unplanned releases. The intensity of liquid effluent monitoring should be graded to the importance of the source being monitored. This can be accomplished by determining the risk posed by the source. A definition of risk is presented that defines risk in terms of the statistical probability of exceeding a release limit and the time available to recover from an exceedance of a release limit. Three examples are presented that show this approach to grading an effluent monitoring program can be implemented at the Idaho National Engineering Laboratory and will reduce monitoring requirements.

  7. A risk-based approach to liquid effluent monitoring

    International Nuclear Information System (INIS)

    Hull, L.C.

    1995-10-01

    DOE Order 5400.1 identifies six objectives of a liquid effluent monitoring program. A strategy is proposed that meets these objective in one of two ways: (1) by showing that effluent concentrations are below concentration limits set by permits or are below concentrations that could cause environmental problems or (2) by showing that concentrations in effluent have not changed from a period when treatment processes were in control and there were no unplanned releases. The intensity of liquid effluent monitoring should be graded to the importance of the source being monitored. This can be accomplished by determining the risk posed by the source. A definition of risk is presented that defines risk in terms of the statistical probability of exceeding a release limit and the time available to recover from an exceedance of a release limit. Three examples are presented that show this approach to grading an effluent monitoring program can be implemented at the Idaho National Engineering Laboratory and will reduce monitoring requirements

  8. Configuration of risk monitor system by plant defense-in-depth risk monitor and reliability monitor

    International Nuclear Information System (INIS)

    Yoshikawa, Hidekazu; Lind Morten; Yang Ming; Hashim Muhammad; Zhang Zhijian

    2012-01-01

    A new method of risk monitor system of a nuclear power plant has been proposed from the aspect by what degree of safety functions incorporated in the plant system is maintained by multiple barriers of defense-in-depth (DiD). Wherein, the central idea is plant DiD risk monitor and reliability monitor derived from the five aspects of (1) design principle of nuclear safety based on DiD concept, (2) definition of risk and risk to be monitored, (3) severe accident phenomena as major risk, (4) scheme of risk ranking, and (5) dynamic risk display. In this paper, the overall frame of the proposed risk monitor system is summarized and the detailed discussion is made on major items such as definition of risk and risk ranking, anatomy of fault occurrence, two-layer configuration of risk monitor, how to configure individual elements of plant DiD risk monitor, and lastly how to apply for a PWR safety system. (author)

  9. The Community Environmental Monitoring Program: Reducing Public Perception of Risk through Stakeholder Involvement

    International Nuclear Information System (INIS)

    William T. Hartwell

    2007-01-01

    The Community Environmental Monitoring Program (CEMP) has promoted stakeholder involvement, awareness, and understanding of radiological surveillance in communities surrounding the Nevada Test Site (NTS) since 1981. It involves stakeholders in the operation, data collection, and dissemination of information obtained from a network of 29 stations across a wide area of Nevada, Utah and California. It is sponsored by the U.S. Department of Energy, National Nuclear Security Administration's Nevada Site Office (NNSA/NSO) and administered by the Desert Research Institute (DRI) of the Nevada System of Higher Education. Integration of a near real-time communications system, a public web site, training workshops for involved stakeholders, and educational programs all help to alleviate public perception of risk of health effects from past activities conducted at the NTS

  10. Operating Experiences of a Loss of Voltage Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun-Chan [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2015-10-15

    Loss of voltage (LOV) events continue to occur due to inadequate work management and random human errors. On February 26, 2015, regulators analyzed the root causes of LOV events and presented the results for the nuclear industry. Currently, KHNP uses a risk monitoring program, which is named 'LOV Monitor', for LOV prevention during pilot plant outages. This review introduces the operation experiences of LOV Monitor based on the evaluation results of a real event. The operation experiences of LOV Monitor in the pilot plants confirmed that this program could detect and reduce LOV possibilities from scheduling errors such as the simultaneous maintenance of energized trains and de-energized trains considering the physical conditions of the power circuit breakers. However, a maintenance culture that heeds the risk monitoring result must be strengthened in order to obtain substantial effects through applying LOV Monitor to the outage.

  11. 24 CFR 266.115 - Program monitoring and evaluation.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Housing Finance Agency Requirements § 266.115 Program monitoring and evaluation. (a) HFA certifications... under this part, basic underwriting and closing information must be submitted in a format specified by...

  12. The Community Environmental Monitoring Program: Reducing Public Perception of Risk Through Stakeholder Involvement

    International Nuclear Information System (INIS)

    T. Hartwell

    2007-01-01

    Between 1951 and 1992, 928 nuclear tests were conducted at the Nevada Test Site (NTS), including 100 atmospheric and 828 underground tests. Initial public reaction to the tests was largely supportive, but by the late 1950s this began to change, largely as a result of fear of the potential for adverse health effects to be caused by exposure to ionizing radiation resulting from the tests. The nuclear power plant accident at Three Mile Island in 1979 served to heighten these fears, as well as foster a general distrust of the federal agencies involved and low public confidence in monitoring results. Modeled after a similar program that involved the public in monitoring activities around the Three Mile Island nuclear power plant, the Community Environmental Monitoring Program (CEMP) has promoted stakeholder involvement, awareness, and understanding of radiological surveillance in communities surrounding the NTS since 1981. It involves stakeholders in the operation, data collection, and dissemination of information obtained from a network of 29 stations across a wide area of Nevada, Utah, and California. It is sponsored by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) and administered by the Desert Research Institute (DRI) of the Nevada System of Higher Education. Since assuming administration of the program in 2000, DRI has accomplished significant enhancements to the network's data collection and transmission capabilities. A robust datalogging and communications system allows for the near real-time transmission of data to a platform maintained by DRI's Western Regional Climate Center, where the data are uploaded and displayed on a publicly accessible web site (http://cemp.dri.edu/). Additionally, the CEMP can serve as part of an emergency response network in the event of an unplanned radiological release from the NTS, and also provides an excellent platform for testing new environmental sensor technologies

  13. Individual monitoring program for occupational exposures to radionuclides by inhalation

    International Nuclear Information System (INIS)

    Piechowski, J.; Menoux, B.

    1985-01-01

    Individual monitoring of exposure to radioactive products is carried out when there is a risk of significant internal contamination. In its publications 26 and 35 the International Commission on Radiological Protection has given recommendations on the monitoring programs. Besides, the metabolic models developed in publication 30 have allowed to establish retention and excretion functions for some radionuclides after intake by inhalation in the adult man. These have been published in the report CEA-R--5266. Considering these data and taking into account the practical problems that occur in the course of surveillance of workers, programs of individual monitoring for contamination by inhalation are proposed. These programs for routine and special monitoring have been developed for the most common radionuclides involved in the nuclear industry [fr

  14. Occupational monitoring program

    International Nuclear Information System (INIS)

    Sordi, G.-M.A.A.

    1988-10-01

    After to give the principal aim of a monitoring program it gives the philosophy in force in our country and the new one, international. It shows the different monitoring types and the classification related to their functions. The functions are deal with, separately, for workplace and individual monitoring. It shows, also, that the individual monitoring can be used to assess the workplace conditions. It discusses the models that can be introduced to assess the quantities used in the results interpretation from the quantities used in the measurements. It gives an example. Finally it discusses the supplementary functions of monitoring as such reassessment of monitoring programs, selection of the controlled areas and the extent form of medical supervision. (author) [pt

  15. Meteorological Monitoring Program

    International Nuclear Information System (INIS)

    Hancock, H.A. Jr.; Parker, M.J.; Addis, R.P.

    1994-01-01

    The purpose of this technical report is to provide a comprehensive, detailed overview of the meteorological monitoring program at the Savannah River Site (SRS) near Aiken, South Carolina. The principle function of the program is to provide current, accurate meteorological data as input for calculating the transport and diffusion of any unplanned release of an atmospheric pollutant. The report is recommended for meteorologists, technicians, or any personnel who require an in-depth understanding of the meteorological monitoring program

  16. Meteorological Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Hancock, H.A. Jr. [ed.; Parker, M.J.; Addis, R.P.

    1994-09-01

    The purpose of this technical report is to provide a comprehensive, detailed overview of the meteorological monitoring program at the Savannah River Site (SRS) near Aiken, South Carolina. The principle function of the program is to provide current, accurate meteorological data as input for calculating the transport and diffusion of any unplanned release of an atmospheric pollutant. The report is recommended for meteorologists, technicians, or any personnel who require an in-depth understanding of the meteorological monitoring program.

  17. Configuration of Risk Monitor System by PLant Defense-In.Depth Monitor and Relability Monitor

    DEFF Research Database (Denmark)

    Yoshikawa, Hidekazu; Lind, Morten; Yang, Ming

    2012-01-01

    A new method of risk monitor system of a nuclear power plant has been proposed from the aspect by what degree of safety functions incorporated in the plant system is maintained by multiple barriers of defense-in-depth (DiD). Wherein, the central idea is plant DiD risk monitor and reliability...... monitor derived from the four aspects of (i) design principle of nuclear safety to realize DiD concept, (ii) definition of risk and risk to be monitored, (iii) severe accident phenomena as major risk, (iv) scheme of risk ranking, and (v) dynamic risk display. In this paper, the overall frame...... of the proposed frame on risk monitor system is summarized and the detailed discussion is made on the definitions of major terminologies of risk, risk ranking, anatomy of fault occurrence, two-layer configuration of risk monitor, how to configure individual elements of plant DiD risk monitor and its example...

  18. Mare Risk Analysis monitor

    International Nuclear Information System (INIS)

    Fuente Prieto, I.; Alonso, P.; Carretero Fernandino, J. A.

    2000-01-01

    The Nuclear Safety Council's requirement that Spanish power plants comply with the requirements of the Maintenance Rule associated with plant risk assessment during power operation, arising from the partial unavailability of systems due to the maintenance activities, has led to need for additional tools to facilitate compliance with said requirements. While the impact on risk produced by individual equipment unavailabilities can easily be evaluated, either qualitatively or quantitatively, the process becomes more complicated when un programmed unavailabilities simultaneously occur in various systems, making it necessary to evaluate their functional impact. It is especially complex in the case of support systems that can affect the functionality of multiple systems. In view of the above, a computer application has been developed that is capable of providing the operator with quick answers based on the specific plant model in order to allow fast risk assessment using the information compiled as part of the Probabilistic Safety Analysis. The paper describes the most important characteristics of this application and the basic design requirements of the MARE Risk Monitor. (Author)

  19. Remote Monitoring Transparency Program

    International Nuclear Information System (INIS)

    Sukhoruchkin, V.K.; Shmelev, V.M.; Roumiantsev, A.N.

    1996-01-01

    The objective of the Remote Monitoring Transparency Program is to evaluate and demonstrate the use of remote monitoring technologies to advance nonproliferation and transparency efforts that are currently being developed by Russia and the United States without compromising the national security to the participating parties. Under a lab-to-lab transparency contract between Sandia National Laboratories (SNL) and the Kurchatov Institute (KI RRC), the Kurchatov Institute will analyze technical and procedural aspects of the application of remote monitoring as a transparency measure to monitor inventories of direct- use HEU and plutonium (e.g., material recovered from dismantled nuclear weapons). A goal of this program is to assist a broad range of political and technical experts in learning more about remote monitoring technologies that could be used to implement nonproliferation, arms control, and other security and confidence building measures. Specifically, this program will: (1) begin integrating Russian technologies into remote monitoring systems; (2) develop remote monitoring procedures that will assist in the application of remote monitoring techniques to monitor inventories of HEU and Pu from dismantled nuclear weapons; and (3) conduct a workshop to review remote monitoring fundamentals, demonstrate an integrated US/Russian remote monitoring system, and discuss the impacts that remote monitoring will have on the national security of participating countries

  20. Puna Geothermal Venture Hydrologic Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1990-04-01

    This document provides the basis for the Hydrologic Monitoring Program (HMP) for the Puna Geothermal Venture. The HMP is complementary to two additional environmental compliance monitoring programs also being submitted by Puma Geothermal Venture (PGV) for their proposed activities at the site. The other two programs are the Meteorology and Air Quality Monitoring Program (MAQMP) and the Noise Monitoring Program (NMP), being submitted concurrently.

  1. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  2. 1988 Monitoring Activities Review (MAR) of the environmental monitoring program

    International Nuclear Information System (INIS)

    1989-03-01

    The EGandG Idaho Environmental Monitoring (EM) Unit is responsible for coordinating and conducting environmental measurements of radioactive and hazardous contaminants around facilities operated by EGandG Idaho. The EM Unit has several broad program objectives, which include complying with regulatory standards and developing a basis for estimating future impacts of operations at EGandG Idaho facilities. To improve program planning and to provide bases for technical improvement of the monitoring program, the EGandG Environmental Monitoring organization has regularly used the Monitoring Activities Review (MAR) process since 1982. Each MAR is conducted by a committee of individuals selected for their experience in the various types of monitoring performed by the EM organization. Previous MAR studies have focused on procedures for all currently monitored media except biota. Biotic monitoring was initiated following the last MAR. This report focuses on all currently monitored media, and includes the first review of biotic monitoring. The review of biotic monitoring has been conducted at a level of detail consistent with initial MAR reports for other parts of the Waste Management Program Facilities Environmental Monitoring Program. The review of the biotic monitoring activities is presented in Section 5.5 of this report. 21 refs., 7 figs., 4 tabs

  3. [Assessment of control of cardiovascular risk factors in obese posmenopausal women after monitoring a structured dietary education and exercise program. (SÍSIFO Program)].

    Science.gov (United States)

    García Soto, Z M; Montoro García, S; Leal Hernández, M; Abellán Alemán, J

    2016-01-01

    Evaluate the influence of a specific program of physical exercise on cardiovascular risk, quality of life and eating habits of menopausal women. Prospective, intervention study previous-after without control group for three months. 66 menopausal women were included. The intervention consisted of a structured diet and exercise program. Biochemical, anthropometric, dietary and life quality parameters were determined before and three months after surgery. After the intervention a decrease in weight (4.4±2,3kg) and BMI (1.83±0.84kg/m(2)) (p<.05) occurs. A decrease in SBP (p<.05) was also observed. The fasting glucose went down 13.75±11.11mg/dl and HbA1c fell by 0.19±0,12%, both with p<.05. The lipid profile follows a similar behavior, highlighting a decline of 8± 6.2mg/dl in LDL cholesterol values (p<.05). The score on the measured cardiovascular risk by the Framingham tables decreases by 3% postoperatively (p<.05). Regarding the quality of life, it is significantly improved in all analyzed areas. The application of a structured exercise and diet program improves close monitoring parameters associated with cardiovascular risk of the women studied. It also improves the quality of life and dietary habits. Copyright © 2016 SEH-LELHA. Publicado por Elsevier España, S.L.U. All rights reserved.

  4. Work plan for the Oak Ridge Reservation ecological monitoring and assessment program

    International Nuclear Information System (INIS)

    Ashwood, T.L.; Sample, B.E.; Suter, G.W. II; Turner, M.G.; Loar, J.M.; Barnthouse, L.W.

    1994-08-01

    This plan describes an approach for developing an ecological monitoring and assessment program (EMAP) for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR). Such a program is required to assess existing ecological risks, to predict changes in those ecological risks from proposed remedial actions, and to monitor the effectiveness of remedial actions in reducing ecological risks. Ecological risk assessments must be based on Reservation-level data for those widespread or wide-ranging plant and animal species that occupy the entire ORR. In recognition of this need, Region 4 of the US Environmental Protection Agency has specifically requested that DOE develop a Reservation-wide monitoring and assessment program. The current strategy distinguishes four types of potentially contaminated areas: (1) source operable units (OUs), which may contain waste disposal areas, (2) groundwater aquifers that are potentially contaminated by source OUs, (3) aquatic integrator OUs which are streams and associated floodplains that drain source OUs, and (4) the terrestrial integrator, which encompasses the Reservation. Source OUs may contain sources of contamination that potentially impact local plant and animal population and communities that are restricted to the areal extent of the OU. Such local impacts must be assessed for each OU. However, these source OUs also contribute to risks within the aquatic OUs and within the Reservation-wide terrestrial ecosystem. Therefore, remedial investigations at source OUs must provide data necessary to support ecological risk assessments at the larger scales

  5. Shutdown risk monitoring in TEPCO

    International Nuclear Information System (INIS)

    Sato, Hiroki; Masuda, Takahiro; Denda, Yasutaka; Yoneyama, Mitsuru; Imai, Shun-ichi; Miyata, Koichi

    2009-01-01

    At present, we are introducing risk monitors into our all three nuclear power stations; Fukushima Daiichi, Fukushima Daini and Kashiwazaki Kariwa, with technical support of TEPSYS. By monitoring shutdown risk of each unit, we are trying to optimize risks during outage inspection, and raising staff's awareness for reactor safety. This paper presents our recent shutdown risk monitoring activities in Fukushima Daiichi NPS. Shutdown risk monitoring has been carried out for the past five outages of Fukushima Daiichi NPS. Daily-changing shutdown risk is evaluated in the form of core damage frequency (CDF [/day/reactor]). We also examine high-risk point of outage plan if CDF is greater than the threshold at anytime of outage. The results are delivered to operational and maintenance staff before outage. The threshold value is set ten times as much as CDF of unit in operation. As CDF exceeds the threshold, we try to either change the system configuration, or let workers pay more attention to their works during the high-risk period. We already have some examples of outage plan modification to reduce CDF using the risk monitoring information. Greater number of station staff tends to pay more attention to shutdown risk thanks to these activities. (author)

  6. 77 FR 5155 - Interest Rate Risk Policy and Program

    Science.gov (United States)

    2012-02-02

    ... directors and management; appropriate IRR measurement and monitoring systems; good internal controls; and... Systems B. Risk Measurement Methods C. Components of IRR Measurement Methods V. Internal Controls VI... risk management and a program to effectively implement that policy, as part of their asset liability...

  7. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  8. Environmental Radiological Impact of Nuclear Power. Monitoring and Control Programs

    International Nuclear Information System (INIS)

    Ramos, L. M.

    2000-01-01

    Radioactive contamination of the environment and public exposure to ionizing radiation may result from releases from programmed or accidental operations in regulated activities, or they may be due to preexisting situations such as contamination caused by past accidents, radioactive rain caused by nuclear tests, or increased natural radioactivity resulting from human activities. In many cases, both the emission sources and the environment should be monitored to determine the risk to the population and verify to what extent the limits and conditions established by competent authorities are being observed. Monitoring can be divided into three categories: monitoring of the emission source, of the receiving medium and of members of the public; individual monitoring of the population is extremely rare and would only be considered when estimated doses substantially exceed the annual public dose limit. In practices likely to produce significant radioactive releases, as is the case of nuclear fuel cycle facilities, the limits and conditions for monitoring and controlling them and the requirements for environmental radiological monitoring are established in the licensing process. Programs implemented during normal operation of the facilities form the basis for monitoring in the event of accidents. in addition to environmental radiological monitoring associated with facilities, different countries have monitoring programs outside the facilities zones of influence, in order to ascertain the nationwide radiological fund and determine possible increases in this fund. In Spain, the facilities that generate radioactive waste have effluent storage, treatment and removal systems and radiological monitoring programs based on site and discharge characteristics. The environmental radiological monitoring system is composed of the network implemented by the owners in the nuclear fuel cycle facilities zones of influence, and by nationwide monitoring networks managed by the Consejo de

  9. Risk monitor riskangel for risk-informed applications in nuclear power plants

    International Nuclear Information System (INIS)

    Wang, Fang; Wang, Jiaqun; Wang, Jin; Li, Yazhou; Hu, Liqin; Wu, Yican

    2016-01-01

    Highlights: • A general risk monitor riskangel with high-speed cutsets generator engine. • Benchmarks of actual nuclear power plant (NPP) instantaneous risk models. • Applications in daily operation, maintenance plan and component out of service. - Abstract: This paper studied the requirements of risk monitor software and its applications as a plant specific risk monitor, which supports risk-informed configuration risk management for the two CANDU 6 units at the Third Qinshan nuclear power plant (TQNPP) in China. It also describes the regulatory prospective on risk-informed Probabilistic Safety Assessment (PSA) applications and the use of risk monitor at operating nuclear power plants, high level technical and functional requirements for the development of CANDU specific risk monitor software, and future development trends.

  10. Monitoring Activities Review action report for the Environmental Monitoring Program

    International Nuclear Information System (INIS)

    Wilhelmsen, R.N.; Wright, K.C.

    1990-12-01

    To improve program planning and to provide bases for technical improvement of the monitoring program, the EG ampersand G Environmental Monitoring (EM) organization has regularly used the Monitoring Activities Review (MAR) process since 1982. Each MAR is conducted by a committee of individuals selected for their experience in the various types of monitoring performed by the EM organization. An MAR of the Environmental Monitoring Program was conducted in 1988. This action report identifies and discusses the recommendations of this MAR committee. This action report also identifies the actions already taken by the EM Unit in response to these recommendations, as well as the actions and schedules to be taken. 10 refs

  11. Impact of Florida's prescription drug monitoring program and pill mill law on high-risk patients: A comparative interrupted time series analysis.

    Science.gov (United States)

    Chang, Hsien-Yen; Murimi, Irene; Faul, Mark; Rutkow, Lainie; Alexander, G Caleb

    2018-04-01

    We quantified the effects of Florida's prescription drug monitoring program and pill mill law on high-risk patients. We used QuintilesIMS LRx Lifelink data to identify patients receiving prescription opioids in Florida (intervention state, N: 1.13 million) and Georgia (control state, N: 0.54 million). The preintervention, intervention, and postintervention periods were July 2010 to June 2011, July 2011 to September 2011, and October 2011 to September 2012. We identified 3 types of high-risk patients: (1) concomitant users: patients with concomitant use of benzodiazepines and opioids; (2) chronic users: long-term, high-dose, opioid users; and (3) opioid shoppers: patients receiving opioids from multiple sources. We compared changes in opioid prescriptions between Florida and Georgia before and after policy implementation among high-risk/low-risk patients. Our monthly measures included (1) average morphine milligram equivalent per transaction, (2) total opioid volume across all prescriptions, (3) average days supplied per transaction, and (4) total number of opioid prescriptions dispensed. Among opioid-receiving individuals in Florida, 6.62% were concomitant users, 1.96% were chronic users, and 0.46% were opioid shoppers. Following policy implementation, Florida's high-risk patients experienced relative reductions in morphine milligram equivalent (opioid shoppers: -1.08 mg/month, 95% confidence interval [CI] -1.62 to -0.54), total opioid volume (chronic users: -4.58 kg/month, CI -5.41 to -3.76), and number of dispensed opioid prescriptions (concomitant users: -640 prescriptions/month, CI -950 to -340). Low-risk patients generally did not experience statistically significantly relative reductions. Compared with Georgia, Florida's prescription drug monitoring program and pill mill law were associated with large relative reductions in prescription opioid utilization among high-risk patients. Copyright © 2018 John Wiley & Sons, Ltd.

  12. BARC-risk monitor- a tool for operational safety assessment in nuclear power plants

    International Nuclear Information System (INIS)

    Vinod, Gopika; Saraf, R.K.; Babar, A.K.; Hadap, Nikhil

    2000-12-01

    Probabilistic safety assessment has become a key tool as on today to identify and understand nuclear power plant vulnerabilities. As a result of the availability of these PSA studies, there is a desire to use them to enhance plant safety and to operate the nuclear stations in the most efficient manner. Risk monitor is a PC based tool, which computes the real time safety level and assists plant personnel to manage day-to-day activities. Risk monitor is a PC based user friendly software tool used for modification and re-analysis of a nuclear power plant. Operation of risk monitor is based on PSA methods for assisting in day to day applications. Risk monitoring programs can assess the risk profile and are used to optimise the operation of nuclear power plants with respect to a minimum risk level over the operating time. This report presents the background activities of risk monitor, its application areas and also gives the status of such tools in international scenarios. The software is based on the PSA model of Kaiga generating station and would be applicable to similar design configuration. (author)

  13. Community Radiation Monitoring Program

    International Nuclear Information System (INIS)

    Cooper, E.N.

    1993-05-01

    The Community Radiation Monitoring Program (CRMP) is a cooperative effort between the US Department of Energy (DOE); the US Environmental Protection Agency (EPA); the Desert Research Institute (DRI), a division of the University and Community College System of Nevada and the Nuclear Engineering Laboratory of the University of Utah (UNEL). The twelfth year of the program began in the fall of 1991, and the work continues as an integral part of the DOE-sponsored long-term offsite radiological monitoring effort that has been conducted by EPA and its predecessors since the inception of nuclear testing at the Nevada Test Site (NTS). The program began as an outgrowth of activities that occurred during the Three Mile Island incident in 1979. The local interest and public participation that took place there were thought to be transferrable to the situation at the NTS, so, with adaptations, that methodology was implemented for this program. The CRMP began by enhancing and centralizing environmental monitoring and sampling equipment at 15 communities in the existing EPA monitoring network, and has since expanded to 19 locations in Nevada, Utah and California. The primary objectives of this program are still to increase the understanding by the people who live in the area surrounding the NTS of the activities for which DOE is responsible, to enhance the performance of radiological sampling and monitoring, and to inform all concerned of the results of these efforts. One of the primary methods used to improve the communication link with people in the potentially impacted area has been the hiring and training of local citizens as station managers and program representatives in those selected communities in the offsite area. These managers, active science teachers wherever possible, have succeeded, through their training, experience, community standing, and effort, in becoming a very visible, able and valuable asset in this link

  14. Pantex Plant meteorological monitoring program

    International Nuclear Information System (INIS)

    Snyder, S.F.

    1993-07-01

    The current meteorological monitoring program of the US Department of Energy's Pantex Plant, Amarillo, Texas, is described in detail. Instrumentation, meteorological data collection and management, and program management are reviewed. In addition, primary contacts are noted for instrumentation, calibration, data processing, and alternative databases. The quality assurance steps implemented during each portion of the meteorological monitoring program are also indicated

  15. Mare Risk Analysis monitor; Monitor de analisis de riesgos mare

    Energy Technology Data Exchange (ETDEWEB)

    Fuente Prieto, I.; Alonso, P.; Carretero Fernandino, J. A. [Empresarios Agrupados, A. I.E. Madrid (Spain)

    2000-07-01

    The Nuclear Safety Council's requirement that Spanish power plants comply with the requirements of the Maintenance Rule associated with plant risk assessment during power operation, arising from the partial unavailability of systems due to the maintenance activities, has led to need for additional tools to facilitate compliance with said requirements. While the impact on risk produced by individual equipment unavailabilities can easily be evaluated, either qualitatively or quantitatively, the process becomes more complicated when un programmed unavailabilities simultaneously occur in various systems, making it necessary to evaluate their functional impact. It is especially complex in the case of support systems that can affect the functionality of multiple systems. In view of the above, a computer application has been developed that is capable of providing the operator with quick answers based on the specific plant model in order to allow fast risk assessment using the information compiled as part of the Probabilistic Safety Analysis. The paper describes the most important characteristics of this application and the basic design requirements of the MARE Risk Monitor. (Author)

  16. Air Quality Monitoring: Risk-Based Choices

    Science.gov (United States)

    James, John T.

    2009-01-01

    Air monitoring is secondary to rigid control of risks to air quality. Air quality monitoring requires us to target the credible residual risks. Constraints on monitoring devices are severe. Must transition from archival to real-time, on-board monitoring. Must provide data to crew in a way that they can interpret findings. Dust management and monitoring may be a major concern for exploration class missions.

  17. Community Radiation Monitoring Program

    International Nuclear Information System (INIS)

    Lucas, R.P. Jr.; Cooper, E.N.; McArthur, R.D.

    1990-05-01

    The Community Radiation Monitoring Program began its ninth year in the summer of 1989, continuing as an essential portion of the Environmental Protection Agency's long-standing off-site monitoring effort. It is a cooperative venture between the Department of Energy (DOE), the Environmental Protection Agency (EPA), the University of Utah (U of U), and the Desert Research Institute (DRI) of the University of Nevada System. The objectives of the program include enhancing and augmenting the collection of environmental radiation data at selected sites around the Nevada Test Site (NTS), increasing public awareness of that effort, and involving, in as many ways as possible, the residents of the off-site area in these and other areas related to testing nuclear weapons. This understanding and improved communication is fostered by hiring residents of the communities where the monitoring stations are located as program representatives, presenting public education forums in those and other communities, disseminating information on radiation monitoring and related subjects, and developing and maintaining contacts with local citizens and elected officials in the off-site areas. 8 refs., 4 figs., 4 tabs

  18. Risk-Based Radioactive Liquid Effluent Monitoring Requirements at the U. S. Department of Energy's Savannah River Site

    International Nuclear Information System (INIS)

    Jannik, G.T.

    2001-01-01

    For Department of Energy (DOE) facilities, clear regulatory guidance exists for structuring radiological air emissions monitoring programs. However, there are no parallel regulations for radiological liquid effluent monitoring programs. In order to bridge this gap and to technically justify liquid effluent monitoring decisions at DOE's Savannah River Site, a graded, risk-basked approach has been established to determine the monitoring and sampling criteria to be applied at each liquid discharge point

  19. The implementation of medical monitoring programs following potentially hazardous exposures: a medico-legal perspective.

    Science.gov (United States)

    Vearrier, David; Greenberg, Michael I

    2017-11-01

    Clinical toxicologists may be called upon to determine the appropriateness of medical monitoring following documented or purported exposures to toxicants in the occupational, environmental, and medical settings. We searched the MEDLINE database using the Ovid ® search engine for the following terms cross-referenced to the MeSH database: ("occupational exposures" OR "environmental exposures") AND ("physiologic monitoring" OR "population surveillance"). The titles and abstracts of the resulted articles were reviewed for relevance. We expanded our search to include non-peer-reviewed publications and gray literature and resources using the same terms as utilized in the MEDLINE search. There were a total of 48 relevant peer-reviewed and non-peer-reviewed publications. Publications excluded contained no information relevant to medical monitoring following potentially harmful toxicologic exposures, discussed only worker screening/surveillance and/or population biomonitoring, contained redundant information, or were superseded by more recent information. Approaches to medical monitoring: A consensus exists in the peer-reviewed medical literature, legal literature, and government publications that for medical monitoring to be a beneficial public health activity, careful consideration must be given to potential benefits and harms of the program. Characteristics of the exposure, the adverse human health effect, the screening test, and the natural history of the disease are important in determining whether an exposed population will reap a net benefit or harm from a proposed monitoring program. Broader interpretations of medical monitoring: Some have argued that medical monitoring programs should not be limited to exposure-related outcomes but should duplicate general preventive medicine efforts to improve public health outcomes although an overall reduction of morbidity, mortality and disability by modifying correctable risk factors and disease conditions. This broader

  20. Development of nuclear power plant Risk Monitor

    International Nuclear Information System (INIS)

    Yang Xiaoming; Sun Jinlong; Ma Chao; Wang Lin; Gu Xiaohui; Bao Zhenli; Qu Yong; Zheng Hao

    2014-01-01

    Risk Monitor is a tool to monitor the real-time risk of a nuclear power plant for risk management and comprehensive decision-making, which has been widely used all over the world. The nuclear power plant Risk Monitor applies the real-time risk model with low-complicacy that could reflect the plant's actual configuration, automatically reads the plant's configuration information from the engineering system through the developed interface, and efficiently analyzes the plant's risk Dy the intelligent parallel-computing method in order to provide the risk basement for the safety management of nuclear power plant. This paper generally introduces the background, architecture, functions and key technical features of a nuclear power plant Risk Monitor, and validates the risk result, which could well reflect the plant's risk information and has a significant practical value. (authors)

  1. Radiation monitoring program at nuclear scientific experimental and educational center - IRT-Sofia

    International Nuclear Information System (INIS)

    Mladenov, A.; Stankov, D.; Marinov, K.; Nonova, T.; Krezhov, K.

    2012-01-01

    Ensuring minimal risk of personnel exposure without exceeding the dose limits is the main task of the General Program for Radiation Monitoring of Nuclear Scientific Experimental and Education Centre (NSEEC) with research reactor IRT. Since 2006 the IRT-Sofia is equipped with a new and modern Radiation Monitoring System (RMS). All RMS detectors are connected to the server RAMSYS. They have online (real-time) visualization in two workstations with RAMVISION software. The RMS allows the implementation of technological and environmental monitoring at the nuclear facility site. Environmental monitoring with the RMS external system includes monitoring of dose rate; alpha and beta activity; radon activity; Po-218, Po-214, Po-212 activity; gamma control of vehicles. Technological control of reactor gases includes: Alpha beta particulate monitor; Iodine monitor; Noble gases monitor; Stack flow monitor. The General Program based on the radiation monitoring system allows real-time monitoring and control of radiation parameters in the controlled area and provides for a high level of radiation protection of IRT staff and users of its facilities. This paper presents the technical and functional parameters of the radiation monitoring system and radiation protection activities within the restricted zone in IRT facilities. (authors)

  2. Post decommissioning monitoring of uranium mines; a watershed monitoring program based on biological response

    International Nuclear Information System (INIS)

    Russel, C.; Coggan, A.; Ludgate, I.

    2006-01-01

    Rio Algom Limited and Denison Mines own and operated uranium mines in the Elliot Lake area. The mines operated from the late 1950's to the mid 1960's and again for the early 1970's to the 1990's when the mines ceased operations. There are eleven decommissioned mines in the Serpent River watershed. At the time of decommissioning each mine had it's own monitoring program, which had evolved over the operating life of the mine and did not necessarily reflect the objectives associated with the monitoring of decommissioned sites. In order to assess the effectiveness of the decommissioning plans and monitoring the cumulative effects within the watershed, a single watershed monitoring program was developed in 1999: the Serpent River Watershed Monitoring Program which focused on water and sediment quality within the watershed and response of the biological community over time. In order to address other 'source area' monitoring, three complimentary objective-focused programs were developed 1) the In- Basin Monitoring Program, 2) the Source Area Monitoring Program and 3) the TMA Operational Monitoring Program. Through development this program framework and monitoring programs that were objective- focused, more meaningful data has been provided while providing a significant reduction in the cost of monitoring. These programs allow for the reduction in scope over time in response to improvement in the watershed. This talk will describe the development of these programs, their implementation and effectiveness. (author)

  3. Geoinformation monitoring of the educational risk in educational institutions of higher education

    Directory of Open Access Journals (Sweden)

    Aleksandr N. Kolesenkov

    2017-01-01

    Full Text Available The effect, received by a person and society from mastering the basic professional educational programs is problematic to quantify, which leads to the emergence of a risk that characterizes the quality of management decision-making procedures for implementing the educational process in higher education institutions in terms of the level of achievement of the set criteria and indicators.The aim of the work is the development of technology for monitoring of the educational risk based on the geoinformation approach and methods of data mining. Assessment of the educational risk can be implemented through monitoring the quality of the implementation of the main professional educational programs of the institution.Monitoring of the educational risk in the implementation of the educational process in institutions of higher education means the collection, cataloging, pre-processing, analysis and visualization of the data, aimed at improving the efficiency and quality of providing educational services. To accomplish this goal, the following methods and approaches are used: geoinformation approach, cluster analysis, probability theory, data classification methods, forecasting methods, forecasting, and data visualization technologies.The scientific and methodological aspects of the development of the methodical, informational and instrumental support of the educational risk management system in educational institutions of higher education are examined. According to the results of the work, it is revealed that the use of geoinformation technologies increases the efficiency of management by the collection automation, processing and analysis of data on the implementation of educational programs.Modern geoinformation technologies provide the opportunity to create and integrate a system that has innovative analytical functionality, and implements new effective technologies, methods and algorithms in the tasks of monitoring the educational programs. The use of

  4. Ecological Monitoring and Compliance Program 2007 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Dennis; Anderson, David; Derek, Hall; Greger, Paul; Ostler, W. Kent

    2008-03-01

    In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate the potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.

  5. Steps in formulating an environmental monitoring program

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This section describes the process of establishing a complete equipment environmental monitoring program; the step by step process is also illustrated in Table 3 of the Summary. The following decisions must be made in defining the program: an initial characterization of plant environment, how to integrate with existing programs to realize the maximum benefits, identification of the specific monitoring locations, determining the monitoring techniques, frequency of recording data, monitoring duration, quality assurance requirements, and finally, establishing the recordkeeping requirements

  6. Linking indices for biodiversity monitoring to extinction risk theory.

    Science.gov (United States)

    McCarthy, Michael A; Moore, Alana L; Krauss, Jochen; Morgan, John W; Clements, Christopher F

    2014-12-01

    Biodiversity indices often combine data from different species when used in monitoring programs. Heuristic properties can suggest preferred indices, but we lack objective ways to discriminate between indices with similar heuristics. Biodiversity indices can be evaluated by determining how well they reflect management objectives that a monitoring program aims to support. For example, the Convention on Biological Diversity requires reporting about extinction rates, so simple indices that reflect extinction risk would be valuable. We developed 3 biodiversity indices that are based on simple models of population viability that relate extinction risk to abundance. We based the first index on the geometric mean abundance of species and the second on a more general power mean. In a third index, we integrated the geometric mean abundance and trend. These indices require the same data as previous indices, but they also relate directly to extinction risk. Field data for butterflies and woodland plants and experimental studies of protozoan communities show that the indices correlate with local extinction rates. Applying the index based on the geometric mean to global data on changes in avian abundance suggested that the average extinction probability of birds has increased approximately 1% from 1970 to 2009. © 2014 The Authors. Conservation Biology published by Wiley Periodicals, Inc., on behalf of the Society for Conservation Biology.

  7. Monitoring Completed Navigation Projects Program

    National Research Council Canada - National Science Library

    Bottin, Jr., Robert R

    2001-01-01

    ... (MCNP) Program. The program was formerly known as the Monitoring Completed Coastal Projects Program, but was modified in the late 1990s to include all navigation projects, inland as well as coastal...

  8. Ecological Monitoring and Compliance Program 2011 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, D. J.; Anderson, D. C.; Hall, D. B.; Greger, P. D.; Ostler, W. K.

    2012-06-13

    The Ecological Monitoring and Compliance (EMAC) Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada National Security Site and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program's activities conducted by National Security Technologies, LLC, during calendar year 2011. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex. During 2011, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  9. Data Analyses and Modelling for Risk Based Monitoring of Mycotoxins in Animal Feed

    Directory of Open Access Journals (Sweden)

    H.J. (Ine van der Fels-Klerx

    2018-01-01

    Full Text Available Following legislation, European Member States should have multi-annual control programs for contaminants, such as for mycotoxins, in feed and food. These programs need to be risk based implying the checks are regular and proportional to the estimated risk for animal and human health. This study aimed to prioritize feed products in the Netherlands for deoxynivalenol and aflatoxin B1 monitoring. Historical mycotoxin monitoring results from the period 2007–2016 were combined with data from other sources. Based on occurrence, groundnuts had high priority for aflatoxin B1 monitoring; some feed materials (maize and maize products and several oil seed products and complete/complementary feed excluding dairy cattle and young animals had medium priority; and all other animal feeds and feed materials had low priority. For deoxynivalenol, maize by-products had a high priority, complete and complementary feed for pigs had a medium priority and all other feed and feed materials a low priority. Also including health consequence estimations showed that feed materials that ranked highest for aflatoxin B1 included sunflower seed and palmkernel expeller/extracts and maize. For deoxynivalenol, maize products were ranked highest, followed by various small grain cereals (products; all other feed materials were of lower concern. Results of this study have proven to be useful in setting up the annual risk based control program for mycotoxins in animal feed and feed materials.

  10. Data Analyses and Modelling for Risk Based Monitoring of Mycotoxins in Animal Feed

    Science.gov (United States)

    van der Fels-Klerx, H.J. (Ine); Adamse, Paulien; Punt, Ans; van Asselt, Esther D.

    2018-01-01

    Following legislation, European Member States should have multi-annual control programs for contaminants, such as for mycotoxins, in feed and food. These programs need to be risk based implying the checks are regular and proportional to the estimated risk for animal and human health. This study aimed to prioritize feed products in the Netherlands for deoxynivalenol and aflatoxin B1 monitoring. Historical mycotoxin monitoring results from the period 2007–2016 were combined with data from other sources. Based on occurrence, groundnuts had high priority for aflatoxin B1 monitoring; some feed materials (maize and maize products and several oil seed products) and complete/complementary feed excluding dairy cattle and young animals had medium priority; and all other animal feeds and feed materials had low priority. For deoxynivalenol, maize by-products had a high priority, complete and complementary feed for pigs had a medium priority and all other feed and feed materials a low priority. Also including health consequence estimations showed that feed materials that ranked highest for aflatoxin B1 included sunflower seed and palmkernel expeller/extracts and maize. For deoxynivalenol, maize products were ranked highest, followed by various small grain cereals (products); all other feed materials were of lower concern. Results of this study have proven to be useful in setting up the annual risk based control program for mycotoxins in animal feed and feed materials. PMID:29373559

  11. Terra Nova Environmental effects monitoring program

    International Nuclear Information System (INIS)

    Williams, U.; Murdoch, M.

    2000-01-01

    Elements of the environmental effects monitoring program in the Terra Nova oil field, about 350 km east-southeast of St. John's, Newfoundland, are described. This oilfield is being developed using a floating production storage and offloading (FPSO) facility. A total of 24 wells are expected to be drilled through seven subsea templates located in four glory holes to protect them from icebergs. Subsea installations will be linked to the FPSO by trenched flowlines connected to flexible risers. The FPSO will offload to shuttle tankers. First oil is expected in 2001. The environmental effects monitoring program will be conducted annually for the first two years beginning in 2000. Subsequent scheduling will be determined after a review of monitoring data collected during the first three years. Input to the design of the monitoring program was provided by all stakeholders, i. e. owners, local public, government agencies and regional and international experts. A model was developed linking project discharges and possible effects to the environment, including marine resources in the area, and the information derived from these activities was used to generate a set of predictions and hypotheses to be tested in the monitoring program. The monitoring program will use two spatial models: a regression or gradient design and a control-impact design. The gradient design will monitor water column and sediment chemistry, sediment toxicity and benthic invertebrate communities. The control-impact design will be used to monitor larger and more mobile fish or shellfish. The evaluated results will serve as the basis for determining impact predictions and to provide information to allow for decisions pertaining to the protection of the marine environment

  12. Health risk evaluation associated to Planktothrix rubescens: An integrated approach to design tailored monitoring programs for human exposure to cyanotoxins.

    Science.gov (United States)

    Manganelli, Maura; Scardala, Simona; Stefanelli, Mara; Vichi, Susanna; Mattei, Daniela; Bogialli, Sara; Ceccarelli, Piegiorgio; Corradetti, Ernesto; Petrucci, Ines; Gemma, Simonetta; Testai, Emanuela; Funari, Enzo

    2010-03-01

    Increasing concern for human health related to cyanotoxin exposure imposes the identification of pattern and level of exposure; however, current monitoring programs, based on cyanobacteria cell counts, could be inadequate. An integrated approach has been applied to a small lake in Italy, affected by Planktothrix rubescens blooms, to provide a scientific basis for appropriate monitoring program design. The cyanobacterium dynamic, the lake physicochemical and trophic status, expressed as nutrients concentration and recycling rates due to bacterial activity, the identification/quantification of toxic genotype and cyanotoxin concentration have been studied. Our results indicate that low levels of nutrients are not a marker for low risk of P. rubescens proliferation and confirm that cyanobacterial density solely is not a reliable parameter to assess human exposure. The ratio between toxic/non-toxic cells, and toxin concentrations, which can be better explained by toxic population dynamic, are much more diagnostic, although varying with time and environmental conditions. The toxic fraction within P. rubescens population is generally high (30-100%) and increases with water depth. The ratio toxic/non-toxic cells is lowest during the bloom, suggesting a competitive advantage for non-toxic cells. Therefore, when P. rubescens is the dominant species, it is important to analyze samples below the thermocline, and quantitatively estimate toxic genotype abundance. In addition, the identification of cyanotoxin content and congeners profile, with different toxic potential, are crucial for risk assessment. Copyright 2009 Elsevier Ltd. All rights reserved.

  13. San Diego Multiple Species Conservation Program (MSCP) Rare Plant Monitoring Review and Revision

    Science.gov (United States)

    McEachern, Kathryn; Pavlik, Bruce M.; Rebman, Jon; Sutter, Rob

    2007-01-01

    Introduction The San Diego Multiple Species Conservation Program (MSCP) was developed for the conservation of plants and animals in the south part of San Diego County, under the California Natural Community Conservation Planning Act of 1991 (California Department of Fish and Game) and the Federal Endangered Species Act of 1973, as amended (16 U.S. Code 1531-1544.) The Program is on the leading edge of conservation, as it seeks to both guide development and conserve at-risk species with the oversight of both State and Federal agencies. Lands were identified for inclusion in the MSCP based on their value as habitat for at-risk plants or plant communities (Natural Community Conservation Planning, 2005). Since its inception in the mid-1990s the Program has protected over 100,000 acres, involving 15 jurisdictions and the U.S. Fish and Wildlife Service (USFWS) and California Department of Fish and Game (CDFG) in the conservation of 87 taxa. Surveys for covered species have been conducted, and management and monitoring have been implemented at some high priority sites. Each jurisdiction or agency manages and monitors their conservation areas independently, while collaborating regionally for long-term protection. The San Diego MSCP is on the forefront of conservation, in one of the most rapidly growing urban areas of the country. The planning effort that developed the MSCP was state-of-the-art, using expert knowledge, spatial habitat modeling, and principles of preserve design to identify and prioritize areas for protection. Land acquisition and protection are ahead of schedule for most jurisdictions. Surveys have verified the locations of many rare plant populations known from earlier collections, and they provide general information on population size and health useful for further conservation planning. Management plans have been written or are in development for most MSCP parcels under jurisdictional control. Several agencies are developing databases for implementation

  14. The community environmental monitoring program: a model for stakeholder involvement in environmental monitoring

    International Nuclear Information System (INIS)

    Hartwell, William T.; Shafer, David S.

    2007-01-01

    Since 1981, the Community Environmental Monitoring Program (CEMP) has involved stakeholders directly in its daily operation and data collection, as well as in dissemination of information on radiological surveillance in communities surrounding the Nevada Test Site (NTS), the primary location where the United States (US) conducted nuclear testing until 1992. The CEMP is funded by the US Department of Energy's National Nuclear Security Administration, and is administered by the Desert Research Institute (DRI) of the Nevada System of Higher Education. The CEMP provides training workshops for stakeholders involved in the program, and educational outreach to address public concerns about health risk and environmental impacts from past and ongoing NTS activities. The network includes 29 monitoring stations located across an approximately 160,000 km 2 area of Nevada, Utah and California in the southwestern US. The principal radiological instruments are pressurized ion chambers for measuring gamma radiation, and particulate air samplers, primarily for alpha/beta detection. Stations also employ a full suite of meteorological instruments, allowing for improved interpretation of the effects of meteorological events on background radiation levels. Station sensors are wired to state-of-the-art data-loggers that are capable of several weeks of on-site data storage, and that work in tandem with a communications system that integrates DSL and wireless internet, land line and cellular phone, and satellite technologies for data transfer. Data are managed through a platform maintained by the Western Regional Climate Center (WRCC) that DRI operates for the U.S. National Oceanic and Atmospheric Administration. The WRCC platform allows for near real-time upload and display of current monitoring information in tabular and graphical formats on a public web site. Archival data for each station are also available on-line, providing the ability to perform trending analyses or calculate site

  15. Ecological Monitoring and Compliance Program 2008 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Dennis J.; Anderson, David C.; Hall, Derek B.; Greger, Paul D.; Ostler, W. Kent

    2009-04-30

    The Ecological Monitoring and Compliance Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2008. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC).

  16. Implementation of an occupational monitoring program in diagnostic radiology at the 'Hospital Universitario Clementino Fraga Filho'

    International Nuclear Information System (INIS)

    Oliveira, Sergio Ricardo de; Carvalho, Antonio Carlos Pires; Azevedo, Ana Cecilia Pedrosa de

    2003-01-01

    An occupational monitoring program in diagnostic radiology was implemented at the Hospital Clementino Fraga Filho of the Rio de Janeiro Federal University (UFRJ), Brazil, in accordance with the Brazilian legislation. Previously, a survey of all personnel involved with ionizing radiation was performed. Many problems were observed: the great majority of the workers were not properly monitored; only three departments of the hospital kept an independent survey of the occupational doses; there was not a follow-up control of the high doses. With the implementation of the program, a new laboratory was chosen to read the dosemeters and this initiative resulted in reduction of the hospital costs. The inclusion of seven more departments in the program represented an increase of 60% in the number of monitored workers. The program also provided a system to control the high doses, especially in the Hemodynamics department, which presented the highest mean dose value (0.32 mSv/month). An area survey program was performed during different periods in places considered of high risk for the workers and for the public as well. At the same time, a software was used to build a database with the aim of controlling all personnel data. The implementation of the program provided all personnel involved a better knowledge of the risks associated with ionizing radiation and of radioprotection, and also awareness of the need of correct use of the personal dose monitors. (author)

  17. Application of quality risk management to set viable environmental monitoring frequencies in biotechnology processing and support areas.

    Science.gov (United States)

    Sandle, Tim

    2012-01-01

    Environmental monitoring programs are essential for pharmaceutical facilities in order to assess the level of environmental control. For biotechnology facilities there is little advice as to the frequency at which viable environmental monitoring should be conducted. This paper outlines an approach, based on the principles of quality risk management, for the development of a framework from which monitoring frequencies can be determined. This involved the identification of common hazards and the evaluation those hazards in terms of the severity of contamination and the probability of contamination occurring. These elements of risk were evaluated for different cleanrooms and the relative risks ranked. Once the risk scores were calculated, the methods for detecting risks within the cleanrooms were assessed. Risk filtering was then used to group different cleanrooms based on their relative risks and detection methods against predetermined monitoring frequencies. Through use of case study examples, the paper presents the model and describes how appropriate frequencies for the environmental monitoring of cleanrooms can be set. Cleanrooms in which biotechnology pharmaceutical processing takes place are subject to environmental monitoring. The frequency at which such monitoring should be performed can be difficult to determine. This paper uses quality risk assessment methods to construct a framework for determining monitoring frequencies and illustrates the suitability of the framework through a case study.

  18. Yucca Mountain Biological resources monitoring program

    International Nuclear Information System (INIS)

    1991-01-01

    The US Department of Energy (US DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a possible site for a geological repository for high-level radioactive waste. To ensure site characterization activities do not adversely affect the Yucca Mountain area, an environmental program, the Yucca Mountain Biological Resources Monitoring Program, has been implemented monitor and mitigate environmental impacts and to ensure activities comply with applicable environmental laws. Potential impacts to vegetation, small mammals, and the desert tortoise (an indigenous threatened species) are addressed, as are habitat reclamation, radiological monitoring, and compilation of baseline data. This report describes the program in Fiscal Years 1989 and 1990. 12 refs., 4 figs., 17 tabs

  19. Yucca Mountain Biological Resources Monitoring Program

    International Nuclear Information System (INIS)

    1992-01-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a possible site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a repository. To ensure that site characterization activities (SCA) do not adversely affect the Yucca Mountain area, an environmental program has been implemented to monitor and mitigate potential impacts and to ensure that activities comply with applicable environmental regulations. This report describes the activities and accomplishments during fiscal year 1991 (FY91) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Activities Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support

  20. Ecological Monitoring and Compliance Program 2010 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, D.J.; Anderson, D.C.; Hall, D.B.; Greger, P.D.; Ostler, W.K.

    2011-07-01

    The Ecological Monitoring and Compliance (EMAC) Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2010. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). During 2010, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  1. Ecological Monitoring and Compliance Program 2009 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, J. Dennis; Anderson, David C.; Hall, Derek B.; Greger, Paul D.; Ostler, W. Kent

    2010-07-13

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC, during calendar year 2009. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex. During 2009, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  2. A risk-based monitoring framework for the long term management of used fuel

    International Nuclear Information System (INIS)

    Garisto, N.C.

    2006-01-01

    The Nuclear Waste Management Organization has a mandate from the Government of Canada to consult with the public and to recommend an approach for managing Canada's used nuclear fuel. Three main fuel management methods are being explored and evaluated by the Nuclear Waste Management Organization: disposal in a Deep Geological Repository (DGR); reactor-site extended storage (RES); and centralized extended storage (CES), either above ground or below ground. The used nuclear fuel management system, whether a DGR or an extended storage system will require monitoring. In this study, a risk-based monitoring framework was developed for the used fuel management program. The proposed approach addresses the unique challenges of used fuel management being implemented in a multi-stakeholder process, including: (i) the complexity of the facilities; (ii) the need to consider both science-based risk and perceived risk in the monitoring plans; and (iii) the difficulty in conducting 'invasive' measurements of sealed systems, particularly over a very long time frame. (author)

  3. Analysis of the effect of risk management practices on the performance of new product development programs

    DEFF Research Database (Denmark)

    Oehmen, Josef; Olechowski, Alison; Kenley, C. Robert

    2014-01-01

    Risk management is receiving much attention, as it is seen as a method to improve cost, schedule, and technical performance of new product development programs. However, there is a lack of empirical research that investigates the effective integration of specific risk management practices proposed...... skills and resources; (2) Tailor risk management to and integrate it with new product development; (3) Quantify impacts of risks on your main objectives; (4) Support all critical decisions with risk management results; (5) Monitor and review your risks, risk mitigation actions, and risk management...... by various standards with new product development programs and their association with various dimensions of risk management success. Based on a survey of 291 product development programs, this paper investigates the association of risk management practices with five categories of product development program...

  4. Ecological Monitoring and Compliance Program 2015 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Derek B. [National Security Technologies, LLC. (NSTec), Las Vegas, NV (United States); Ostler, W. Kent [National Security Technologies, LLC. (NSTec), Las Vegas, NV (United States); Anderson, David C. [National Security Technologies, LLC. (NSTec), Las Vegas, NV (United States); Greger, Paul D. [National Security Technologies, LLC. (NSTec), Las Vegas, NV (United States)

    2016-01-01

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2015. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2015, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  5. Ecological Monitoring and Compliance Program 2016 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Derek [National Security Technologies, LLC. (NSTec), Mercury, NV (United States); Perry, Jeanette [National Security Technologies, LLC. (NSTec), Mercury, NV (United States); Ostler, W. Kent [National Security Technologies, LLC. (NSTec), Mercury, NV (United States)

    2017-09-06

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2016. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2016, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  6. Yucca Mountain biological resources monitoring program

    International Nuclear Information System (INIS)

    1993-02-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a potential site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a potential repository. To ensure that site characterization activities (SCA) do not adversely affect the environment at Yucca Mountain, an environmental program has been implemented to monitor and mitigate potential impacts and ensure activities comply with applicable environmental regulations. This report describes the activities and accomplishments of EG ampersand G Energy Measurements, Inc. (EG ampersand G/EM) during fiscal year 1992 (FY92) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support

  7. Microbiological Monitoring for the Constellation Program: Current Requirements and Future Considerations

    Science.gov (United States)

    Ott, C. Mark

    2007-01-01

    Microbiological requirements for spaceflight are based on assessments of infectious disease risk which could impact crew health or mission success. The determination of risk from infectious disease is composed of several factors including (1) crew susceptibility, (2) crew exposure to the infectious disease agent, (3) the concentration of the infectious agent, and (4) the characteristics of the infectious agent. As a result of the Health Stabilization Program, stringent monitoring, and cleaning protocols, in-flight environmental microbial monitoring is not necessary for short-duration spaceflights. However, risk factors change for long-duration missions, as exemplified by the presence of medically significant organisms in the environments of both the Mir and International Space Station (ISS). Based upon this historical evidence, requirements for short duration usage aboard the Orion Crew Exploration Vehicle and Lunar Lander Vehicle will not require in-flight monitoring; however, as mission duration increases with a Lunar Outpost, an ability to detect microbial hazard will be necessary. The nature of the detection requirements will depend on the maturity of technology in a rapidly evolving marketplace. Regardless, the hardware will still need to maximize information to discipline experts and the crew, while minimizing the size, mass, power consumption, and crew time usage. The refinement of these monitors will be a major goal in our efforts to travel successfully to Mars.

  8. Efforts Toward an Early Warning Crop Monitor for Countries at Risk

    Science.gov (United States)

    Budde, M. E.; Verdin, J. P.; Barker, B.; Humber, M. L.; Becker-Reshef, I.; Justice, C. O.; Magadzire, T.; Galu, G.; Rodriguez, M.; Jayanthi, H.

    2015-12-01

    Assessing crop growing conditions is a crucial aspect of monitoring food security in the developing world. One of the core components of the Group on Earth Observations - Global Agricultural Monitoring (GEOGLAM) targets monitoring Countries at Risk (component 3). The Famine Early Warning Systems Network (FEWS NET) has a long history of utilizing remote sensing and crop modeling to address food security threats in the form of drought, floods, pest infestation, and climate change in some of the world's most at risk countries. FEWS NET scientists at the U.S. Geological Survey Earth Resources Observation and Science (EROS) Center and the University of Maryland Department of Geography have undertaken efforts to address component 3, by promoting the development of a collaborative Early Warning Crop Monitor (EWCM) that would specifically address Countries at Risk. A number of organizations utilize combinations of satellite earth observations, field campaigns, network partner inputs, and crop modeling techniques to monitor crop conditions throughout the world. Agencies such as the Food and Agriculture Organization of the United Nations (FAO), United Nations World Food Programme (WFP), and the European Commission's Joint Research Centre (JRC) provide agricultural monitoring information and reporting across a broad number of areas at risk and in many cases, organizations routinely report on the same countries. The latter offers an opportunity for collaboration on crop growing conditions among agencies. The reduction of uncertainty and achievement of consensus will help strengthen confidence in decisions to commit resources for mitigation of acute food insecurity and support for resilience and development programs. In addition, the development of a collaborative global EWCM will provide each of the partner agencies with the ability to quickly gather crop condition information for areas where they may not typically work or have access to local networks. Using a framework

  9. Regional Environmental Monitoring and Assessment Program Data (REMAP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Regional Environmental Monitoring and Assessment Program (REMAP) was initiated to test the applicability of the Environmental Monitoring and Assessment Program...

  10. Ecological Monitoring and Compliance Program 2012 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Derek B.; Anderson, David C.; Greger, Paul D.; Ostler, W. Kent; Hansen, Dennis J.

    2013-07-03

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2012. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). During 2012, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  11. Ecological Monitoring and Compliance Program 2013 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Derek B. [National Security Technologies, LLC, Las Vegas, NV (United States); Anderson, David C. [National Security Technologies, LLC, Las Vegas, NV (United States); Greger, Paul D. [National Security Technologies, LLC, Las Vegas, NV (United States)

    2014-07-01

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2013. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2013, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

  12. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  13. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Leslie A. [DOE/NNSA

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  14. Design and implementation of an online risk monitor

    International Nuclear Information System (INIS)

    Majdara, A.; Nematollah, M. R.; Haddad, K.; Sepanloo, K.

    2006-01-01

    Probabilistic Safety Assessment is a powerful method for evaluating the safety of nuclear facilities. Probabilistic Safety Assessment models are the basis of online risk monitors, which can be utilized for monitoring the online risk. In this paper a newly developed risk monitor called Safety Assessment Tool is presented, and its main features and capabilities are introduced. Some of these features are: graphical event/fault tree developing interface, a 30-day risk profile, performing importance analysis, different administrative levels, and handling time dependent failure data. Safety Assessment Tool can be utilized in nuclear power plants, research reactors, etc. as an online assistant to manage safety issues and prevent high-risk configurations

  15. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  16. Dynamic Relationships Between Parental Monitoring, Peer Risk Involvement and Sexual Risk Behavior Among Bahamian Mid-Adolescents.

    Science.gov (United States)

    Wang, Bo; Stanton, Bonita; Deveaux, Lynette; Li, Xiaoming; Lunn, Sonja

    2015-06-01

    Considerable research has examined reciprocal relationships between parenting, peers and adolescent problem behavior; however, such studies have largely considered the influence of peers and parents separately. It is important to examine simultaneously the relationships between parental monitoring, peer risk involvement and adolescent sexual risk behavior, and whether increases in peer risk involvement and changes in parental monitoring longitudinally predict adolescent sexual risk behavior. Four waves of sexual behavior data were collected between 2008/2009 and 2011 from high school students aged 13-17 in the Bahamas. Structural equation and latent growth curve modeling were used to examine reciprocal relationships between parental monitoring, perceived peer risk involvement and adolescent sexual risk behavior. For both male and female youth, greater perceived peer risk involvement predicted higher sexual risk behavior index scores, and greater parental monitoring predicted lower scores. Reciprocal relationships were found between parental monitoring and sexual risk behavior for males and between perceived peer risk involvement and sexual risk behavior for females. For males, greater sexual risk behavior predicted lower parental monitoring; for females, greater sexual risk behavior predicted higher perceived peer risk involvement. According to latent growth curve models, a higher initial level of parental monitoring predicted decreases in sexual risk behavior, whereas both a higher initial level and a higher growth rate of peer risk involvement predicted increases in sexual risk behavior. Results highlight the important influence of peer risk involvement on youths' sexual behavior and gender differences in reciprocal relationships between parental monitoring, peer influence and adolescent sexual risk behavior.

  17. The meteorological monitoring audit, preventative maintenance and quality assurance programs at a former nuclear weapons facility

    International Nuclear Information System (INIS)

    Maxwell, D.R.

    1995-01-01

    The purposes of the meteorological monitoring audit, preventative maintenance, and quality assurance programs at the Rocky Flats Environmental Technology Site (Site), are to (1) support Emergency Preparedness (EP) programs at the Site in assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance activities, and remediation activities. The risk from the Site includes chemical and radioactive emissions historically related to nuclear weapons component production activities that are currently associated with storage of large quantities of radionuclides (plutonium) and radioactive waste forms. The meteorological monitoring program provides information for site-specific weather forecasting, which supports Site operations, employee safety, and Emergency Preparedness operations

  18. Characterization, Monitoring and Sensor Technology Integrated Program

    International Nuclear Information System (INIS)

    1993-01-01

    This booklet contains summary sheets that describe FY 1993 characterization, monitoring, and sensor technology (CMST) development projects. Currently, 32 projects are funded, 22 through the OTD Characterization, Monitoring, and Sensor Technology Integrated Program (CMST-IP), 8 through the OTD Program Research and Development Announcement (PRDA) activity managed by the Morgantown Energy Technology Center (METC), and 2 through Interagency Agreements (IAGs). This booklet is not inclusive of those CMST projects which are funded through Integrated Demonstrations (IDs) and other Integrated Programs (IPs). The projects are in six areas: Expedited Site Characterization; Contaminants in Soils and Groundwater; Geophysical and Hydrogeological Measurements; Mixed Wastes in Drums, Burial Grounds, and USTs; Remediation, D ampersand D, and Waste Process Monitoring; and Performance Specifications and Program Support. A task description, technology needs, accomplishments and technology transfer information is given for each project

  19. Advanced condition monitoring program for turbine system

    International Nuclear Information System (INIS)

    Ono, Shigetoshi

    2015-01-01

    It is important for utilities to achieve a stable operation in nuclear power plants. To achieve it, plant anomalies that affect a stable operation must be found out and eliminated. Therefore, the advanced condition monitoring program was developed. In this program, a sophisticated heat balance model based on the actual plant data is adopted to identify plant anomalies at an incipient stage and the symptoms of plant anomalies are found by heat balance changes from the model calculation. The model calculation results have shown precise prediction for actual plant parameters. Moreover, this program has the diagnostic engine that helps operators derive the cause of plant anomalies. By using this monitoring program, the component reliability in the turbine system can be periodically monitored and assessed, and as a result the stable operation of nuclear power plants can be achieved. (author)

  20. The NASA risk management program

    International Nuclear Information System (INIS)

    Buchbinder, B.; Philipson, L.L.

    1989-01-01

    This paper reports that the NASA Risk Management Program has been established to ensure the appropriate application of risk-based procedures in support of the elimination, reduction, or acceptance of significant safety risks of concern in NASA. The term appropriate is emphasized, in that the particular procedures applied to each given risk are to reflect its character and prioritized importance, the technological and economic feasibility of its treatment. A number of key documents have been produced in support of this implementation. Databases, risk analysis tools, and risk communication procedures requisite to the execution of the risk management functions also are being developed or documented. Several risk management applications have been made and a comprehensive application to a major new NASA program is underway. This paper summarizes the development and current status of the NASA Risk Management Program. Some principal actions that have been carried out in NASA in consonance with the program are noted particularly, and views are presented on the program's likely future directions

  1. Long Term Resource Monitoring Program procedures: fish monitoring

    Science.gov (United States)

    Ratcliff, Eric N.; Glittinger, Eric J.; O'Hara, T. Matt; Ickes, Brian S.

    2014-01-01

    This manual constitutes the second revision of the U.S. Army Corps of Engineers’ Upper Mississippi River Restoration-Environmental Management Program (UMRR-EMP) Long Term Resource Monitoring Program (LTRMP) element Fish Procedures Manual. The original (1988) manual merged and expanded on ideas and recommendations related to Upper Mississippi River fish sampling presented in several early documents. The first revision to the manual was made in 1995 reflecting important protocol changes, such as the adoption of a stratified random sampling design. The 1995 procedures manual has been an important document through the years and has been cited in many reports and scientific manuscripts. The resulting data collected by the LTRMP fish component represent the largest dataset on fish within the Upper Mississippi River System (UMRS) with more than 44,000 collections of approximately 5.7 million fish. The goal of this revision of the procedures manual is to document changes in LTRMP fish sampling procedures since 1995. Refinements to sampling methods become necessary as monitoring programs mature. Possible refinements are identified through field experiences (e.g., sampling techniques and safety protocols), data analysis (e.g., planned and studied gear efficiencies and reallocations of effort), and technological advances (e.g., electronic data entry). Other changes may be required because of financial necessity (i.e., unplanned effort reductions). This version of the LTRMP fish monitoring manual describes the most current (2014) procedures of the LTRMP fish component.

  2. Completion of risk assessment and monitoring within forensic psychiatry.

    Science.gov (United States)

    Galappathie, Nuwan; Heeramun, Ragini; Jethwa, Krishma

    2009-04-01

    There is a clear need for high standards of risk assessment and monitoring within forensic psychiatry. This has been highlighted by a number of high profile homicide enquires which have called for better standards of multidisciplinary risk assessment and monitoring. There are no national standards for risk assessment. We conducted a study to audit electronically the completion rate of a service-designed risk assessment document within Fromside, a medium secure unit in the UK. The completion rates for key sections of 64 risk assessment documents were assessed. Only 48 of the 64 (75%) documents were electronically available. The completion rates ranged from 59/64 (92%) for the retrospective risk review to 46/64 (72%) for relapse indicators. Only 35/64 (55%) risk documents were updated within the last three months. We found that the use of risk profile documents has helped achieve good standards of risk assessment, however greater priority needs to be given to ongoing monitoring. We recommend that consideration is given to the development of national guidelines for multidisciplinary risk assessment and monitoring.

  3. Sandia National Laboratories California Environmental Monitoring Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2007-03-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Monitoring Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/CA.

  4. Radiation monitor training program at Rocky Flats

    International Nuclear Information System (INIS)

    Medina, L.C.; Kittinger, W.D.; Vogel, R.M.

    The Rocky Flats Radiation Monitor Training Program is tailored to train new health physics personnel in the field of radiation monitoring. The purpose of the prescribed materials and media is to be consistent in training in all areas of Rocky Flats radiation monitoring job involvement

  5. Establishing a national biological laboratory safety and security monitoring program.

    Science.gov (United States)

    Blaine, James W

    2012-12-01

    The growing concern over the potential use of biological agents as weapons and the continuing work of the Biological Weapons Convention has promoted an interest in establishing national biological laboratory biosafety and biosecurity monitoring programs. The challenges and issues that should be considered by governments, or organizations, embarking on the creation of a biological laboratory biosafety and biosecurity monitoring program are discussed in this article. The discussion focuses on the following questions: Is there critical infrastructure support available? What should be the program focus? Who should be monitored? Who should do the monitoring? How extensive should the monitoring be? What standards and requirements should be used? What are the consequences if a laboratory does not meet the requirements or is not willing to comply? Would the program achieve the results intended? What are the program costs? The success of a monitoring program can depend on how the government, or organization, responds to these questions.

  6. Automating the personnel dosimeter monitoring program

    International Nuclear Information System (INIS)

    Compston, M.W.

    1982-12-01

    The personnel dosimetry monitoring program at the Portsmouth uranium enrichment facility has been improved by using thermoluminescent dosimetry to monitor for ionizing radiation exposure, and by automating most of the operations and all of the associated information handling. A thermoluminescent dosimeter (TLD) card, worn by personnel inside security badges, stores the energy of ionizing radiation. The dosimeters are changed-out periodically and are loaded 150 cards at a time into an automated reader-processor. The resulting data is recorded and filed into a useful form by computer programming developed for this purpose

  7. The critical role of volcano monitoring in risk reduction

    Directory of Open Access Journals (Sweden)

    R. I. Tilling

    2008-01-01

    Full Text Available Data from volcano-monitoring studies constitute the only scientifically valid basis for short-term forecasts of a future eruption, or of possible changes during an ongoing eruption. Thus, in any effective hazards-mitigation program, a basic strategy in reducing volcano risk is the initiation or augmentation of volcano monitoring at historically active volcanoes and also at geologically young, but presently dormant, volcanoes with potential for reactivation. Beginning with the 1980s, substantial progress in volcano-monitoring techniques and networks – ground-based as well space-based – has been achieved. Although some geochemical monitoring techniques (e.g., remote measurement of volcanic gas emissions are being increasingly applied and show considerable promise, seismic and geodetic methods to date remain the techniques of choice and are the most widely used. Availability of comprehensive volcano-monitoring data was a decisive factor in the successful scientific and governmental responses to the reawakening of Mount St. elens (Washington, USA in 1980 and, more recently, to the powerful explosive eruptions at Mount Pinatubo (Luzon, Philippines in 1991. However, even with the ever-improving state-of-the-art in volcano monitoring and predictive capability, the Mount St. Helens and Pinatubo case histories unfortunately still represent the exceptions, rather than the rule, in successfully forecasting the most likely outcome of volcano unrest.

  8. The North American Amphibian Monitoring Program. [abstract

    Science.gov (United States)

    Griffin, J.

    1998-01-01

    The North American Amphibian Monitoring Program has been under development for the past three years. The monitoring strategy for NAAMP has five main prongs: terrestrial salamander surveys, calling surveys, aquatic surveys, western surveys, and atlassing. Of these five, calling surveys were selected as one of the first implementation priorities due to their friendliness to volunteers of varying knowledge levels, relative low cost, and the fact that several groups had already pioneered the techniques involved. While some states and provinces had implemented calling surveys prior to NAAMP, like WI and IL, most states and provinces had little or no history of state/provincewide amphibian monitoring. Thus, the majority of calling survey programs were initiated in the past two years. To assess the progress of this pilot phase, a program review was conducted on the status of the NAAMP calling survey program, and the results of that review will be presented at the meeting. Topics to be discussed include: who is doing what where, extent of route coverage, the continuing random route discussions, quality assurance, strengths and weaknesses of calling surveys, reliability of data, and directions for the future. In addition, a brief overview of the DISPro project will be included. DISPro is a new amphibian monitoring program in National Parks, funded by the Demonstration of Intensive Sites Program (DISPro) through the EPA and NPS. It will begin this year at Big Bend and Shenandoah National Parks. The purpose of the DISPro Amphibian Project will be to investigate relationships between environmental factors and stressors and the distribution, abundance, and health of amphibians in these National Parks. At each Park, amphibian long-term monitoring protocols will be tested, distributions and abundance of amphibians will be mapped, and field research experiments will be conducted to examine stressor effects on amphibians (e.g., ultraviolet radiation, contaminants, acidification).

  9. Analysis and Implement of Broadcast Program Monitoring Data

    Directory of Open Access Journals (Sweden)

    Song Jin Bao

    2016-01-01

    Full Text Available With the rapid development of the radio and TV industry and the implementation of INT (the integration of telecommunications networks, cable TV networks and the Internet, the contents of programs and advertisements is showing massive, live and interactive trends. In order to meet the security of radio and television, the broadcast of information have to be controlled and administered. In order to master the latest information of public opinion trends through radio and television network, it is necessary research the specific industry applications of broadcast program monitoring. In this paper, the importance of broadcast monitoring in public opinion analysis is firstly analysed. The monitoring radio and television programs broadcast system architecture is proposed combining with the practice, focusing on the technical requirements and implementation process of program broadcast, advertisement broadcast and TV station broadcast monitoring. The more efficient information is generated through statistical analysis, which provides data analysis for radio and television public opinion analysis.

  10. Application impact of internal monitoring criteria in radiological protection programs of nuclear medicine services

    International Nuclear Information System (INIS)

    Dantas, Bernardo M.; Dantas, Ana Leticia A.; Juliao, Ligia Q.C.; Lourenco, Maria Cristina; Melo, Dunstana R.

    2005-01-01

    This work presents the simulation of the internal monitoring criteria application for the most used radionuclides by the area of nuclear medicine, taking into consideration the usual conditions of usual source handling and the activity bands authorized by the CNEN. It is concluded that the handling of Iodine 131 for therapeutical purposes is the practice which presents the most risk of internal exposure for the works, requiring the adoption of a program for internal monitoring by the nuclear medicine services

  11. Risk-adapted monitoring is not inferior to extensive on-site monitoring: Results of the ADAMON cluster-randomised study.

    Science.gov (United States)

    Brosteanu, Oana; Schwarz, Gabriele; Houben, Peggy; Paulus, Ursula; Strenge-Hesse, Anke; Zettelmeyer, Ulrike; Schneider, Anja; Hasenclever, Dirk

    2017-12-01

    Background According to Good Clinical Practice, clinical trials must protect rights and safety of patients and make sure that the trial results are valid and interpretable. Monitoring on-site has an important role in achieving these objectives; it controls trial conduct at trial sites and informs the sponsor on systematic problems. In the past, extensive on-site monitoring with a particular focus on formal source data verification often lost sight of systematic problems in study procedures that endanger Good Clinical Practice objectives. ADAMON is a prospective, stratified, cluster-randomised, controlled study comparing extensive on-site monitoring with risk-adapted monitoring according to a previously published approach. Methods In all, 213 sites from 11 academic trials were cluster-randomised between extensive on-site monitoring (104) and risk-adapted monitoring (109). Independent post-trial audits using structured manuals were performed to determine the frequency of major Good Clinical Practice findings at the patient level. The primary outcome measure is the proportion of audited patients with at least one major audit finding. Analysis relies on logistic regression incorporating trial and monitoring arm as fixed effects and site as random effect. The hypothesis was that risk-adapted monitoring is non-inferior to extensive on-site monitoring with a non-inferiority margin of 0.60 (logit scale). Results Average number of monitoring visits and time spent on-site was 2.1 and 2.7 times higher in extensive on-site monitoring than in risk-adapted monitoring, respectively. A total of 156 (extensive on-site monitoring: 76; risk-adapted monitoring: 80) sites were audited. In 996 of 1618 audited patients, a total of 2456 major audit findings were documented. Depending on the trial, findings were identified in 18%-99% of the audited patients, with no marked monitoring effect in any of the trials. The estimated monitoring effect is -0.04 on the logit scale with two-sided 95

  12. Characterization monitoring & sensor technology crosscutting program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The purpose of the Characterization, Monitoring, and Sensor Technology Crosscutting Program (CMST-CP) is to deliver appropriate characterization, monitoring, and sensor technology (CMST) to the OFfice of Waste Management (EM-30), the Office of Environmental Restoration (EM-40), and the Office of Facility Transition and Management (EM-60).

  13. Risk assessment and risk management at the Canadian Food Inspection Agency (CFIA): a perspective on the monitoring of foods for chemical residues.

    Science.gov (United States)

    Bietlot, Henri P; Kolakowski, Beata

    2012-08-01

    The Canadian Food Inspection Agency (CFIA) uses 'Ranked Risk Assessment' (RRA) to prioritize chemical hazards for inclusion in monitoring programmes or method development projects based on their relative risk. The relative risk is calculated for a chemical by scoring toxicity and exposure in the 'risk model scoring system' of the Risk Priority Compound List (RPCL). The relative ranking and the risk management options are maintained and updated in the RPCL. The ranking may be refined by the data generated by the sampling and testing programs. The two principal sampling and testing programmes are the National Chemical Residue Monitoring Program (NCRMP) and the Food Safety Action Plan (FSAP). The NCRMP sampling plans focus on the analysis of federally registered products (dairy, eggs, honey, meat and poultry, fresh and processed fruit and vegetable commodities, and maple syrup) for residues of veterinary drugs, pesticides, environmental contaminants, mycotoxins, and metals. The NCRMP is complemented by the Food Safety Action Plan (FSAP) targeted surveys. These surveys focus on emerging chemical hazards associated with specific foods or geographical regions for which applicable maximum residue limits (MRLs) are not set. The data from the NCRMP and FSAP also influence the risk management (follow-up) options. Follow-up actions vary according to the magnitude of the health risk, all with the objective of preventing any repeat occurrence to minimize consumer exposure to a product representing a potential risk to human health. © Her Majesty the Queen in Right of Canada 2012. Drug Testing and Analysis © 2012 John Wiley & Sons, Ltd.

  14. The Savannah River Site's Groundwater Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-06-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  15. 75 FR 58468 - Terrorism Risk Insurance Program; Program Loss Reporting

    Science.gov (United States)

    2010-09-24

    ... DEPARTMENT OF THE TREASURY Terrorism Risk Insurance Program; Program Loss Reporting AGENCY: Departmental Offices, Terrorism Risk Insurance Program Office, Treasury. ACTION: Notice and request for... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the Terrorism Risk Insurance Program...

  16. Unregulated Contaminant Monitoring Program Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — EPA uses the Unregulated Contaminant Monitoring (UCM) program to collect data for contaminants suspected to be present in drinking water, but that do not have...

  17. Danish integrated antimicrobial in resistance monitoring and research program

    DEFF Research Database (Denmark)

    Hammerum, Anette Marie; Heuer, Ole Eske; Emborg, Hanne-Dorthe

    2007-01-01

    a systematic and continuous monitoring program of antimicrobial drug consumption and antimicrobial agent resistance in animals, food, and humans, the Danish Integrated Antimicrobial Resistance Monitoring and Research Program (DANMAP). Monitoring of antimicrobial drug resistance and a range of research......Resistance to antimicrobial agents is an emerging problem worldwide. Awareness of the undesirable consequences of its widespread occurrence has led to the initiation of antimicrobial agent resistance monitoring programs in several countries. In 1995, Denmark was the first country to establish...... activities related to DANMAP have contributed to restrictions or bans of use of several antimicrobial agents in food animals in Denmark and other European Union countries....

  18. Program of environmental radiological monitoring

    International Nuclear Information System (INIS)

    2005-11-01

    This Regulation refers to the requirement of the Regulation CNEN-NN.3.01, 'Basic Act of Radiological Protection', as expressed in the section 5.14, related to the Program of Environmental Radiological Monitoring (PMRA)

  19. Northern Rivers Basins human health monitoring program : report

    International Nuclear Information System (INIS)

    Gabos, S.

    1999-04-01

    The Northern River Basins Human Health Monitoring Program was established in 1994 to investigate the possible relationships between various environmental risk factors and the health of northern residents in the province. This report presents the initial analysis of the health program and examines the differences in health outcomes across the province and compares the Northern Rivers Basin Study (NRBS) area with the other areas of the province. A series of maps and graphs showed the prevalence of certain diseases and disorders within the Peace and Athabasca river basins. The focus of the report was on reproductive health, congenital anomalies, respiratory ailments, circulatory diseases, gastrointestinal disorders, endocrine and metabolic disorders, and neurocognitive disorders. The study showed that compared to other areas of the province, the NRBS area had higher incidences of endometriosis, selected congenital anomalies, bronchitis, pneumonia, peptic ulcers and epilepsy. There were three potential exposure pathways to environmental contaminants. These were through ingestion of water or food, inhalation of air and through dermal exposure. refs., tabs., figs

  20. Northern Rivers Basins human health monitoring program : report

    Energy Technology Data Exchange (ETDEWEB)

    Gabos, S. [Alberta Health, Edmonton, AB (Canada). Health Surveillance

    1999-04-01

    The Northern River Basins Human Health Monitoring Program was established in 1994 to investigate the possible relationships between various environmental risk factors and the health of northern residents in the province. This report presents the initial analysis of the health program and examines the differences in health outcomes across the province and compares the Northern Rivers Basin Study (NRBS) area with the other areas of the province. A series of maps and graphs showed the prevalence of certain diseases and disorders within the Peace and Athabasca river basins. The focus of the report was on reproductive health, congenital anomalies, respiratory ailments, circulatory diseases, gastrointestinal disorders, endocrine and metabolic disorders, and neurocognitive disorders. The study showed that compared to other areas of the province, the NRBS area had higher incidences of endometriosis, selected congenital anomalies, bronchitis, pneumonia, peptic ulcers and epilepsy. There were three potential exposure pathways to environmental contaminants. These were through ingestion of water or food, inhalation of air and through dermal exposure. refs., tabs., figs.

  1. Ecological Monitoring and Compliance Program Fiscal Year 1999 Report

    Energy Technology Data Exchange (ETDEWEB)

    Cathy A. Wills

    1999-12-01

    The Ecological and Compliance program, funded through the U. S. Department of Energy, Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1999. Program activities included: (1) biological surveys at proposed construction sites (2) desert tortoise compliance (3) ecosystem mapping (4) sensitive species and unique habitat monitoring and (5) biological monitoring at the HAZMAT Spill Center.

  2. HIV/AIDS Knowledge, Self-Efficacy for Limiting Sexual Risk Behavior and Parental Monitoring.

    Science.gov (United States)

    Mahat, Ganga; Scoloveno, Mary Ann; Scoloveno, Robert

    2016-01-01

    The purpose of this study was to explore HIV/AIDS knowledge, self-efficacy for sexual risk behaviors, and parental monitoring in a sample of 140 7th and 9th grade adolescents studying in an urban high school in the United States. Further, the study examined differences in HIV/AIDS knowledge, self-efficacy and parental monitoring by grade and gender. This study also investigated the effectiveness of an HIV/AIDS peer education program, Teens for AIDS Prevention (TAP), on improving adolescents' HIV/AIDS knowledge. A quasi-experimental design was used to examine effects of the peer education program (TAP) on adolescents' HIV/AIDS knowledge. Pearson-product-moment correlation coefficients were calculated to examine the relationships among the variables. Independent t-tests were used to compare adolescents' HIV/AIDS knowledge, self-efficacy, and parental monitoring scores by grade and gender. Paired t-tests were used to determine differences in pre-intervention and post-intervention HIV/AIDS knowledge. The results showed that HIV/AIDS knowledge improved significantly in both 7th and 9th grade students after the intervention. HIV/AIDS knowledge was associated with self-efficacy; however it was not associated with parental monitoring. There were no significant differences in HIV/AIDS knowledge and self-efficacy by gender. However, there was a significant difference in parental monitoring by gender. Pediatric nurses are well-positioned to develop and implement evidence-based programs for adolescents. It is essential that pediatric nurses, in conjunction with other professionals and parent groups, take the initiative in implementing peer education programs in schools and community centers to promote healthy behaviors among adolescents. Copyright © 2016 Elsevier Inc. All rights reserved.

  3. Assessing the need for a routine monitoring program in three Nuclear Medicine centers in Chile

    International Nuclear Information System (INIS)

    Astudillo, R.; Hermosilla, A.; Diaz-Londono, G.; Garcia, M.

    2015-01-01

    The workers performing different activities with radionuclides in nuclear medicine centers are at potential risk of external exposure and internal contamination. The IAEA Safety Guide No. RS-G-1.2 proposed criteria for determining the need for a routine monitoring program to assess internal contamination. For this purpose, an Excel template containing the IAEA criteria was applied in three nuclear medicine centers in Chile. The results show that it is necessary to carry out a routine monitoring program for five workers who handle 131 I and three for 99m Tc. We propose to implement this template at a national level in order to improve the conditions of radiation protection in the participating centers. (authors)

  4. Machinery Vibration Monitoring Program at the Savannah River Site

    International Nuclear Information System (INIS)

    Potvin, M.M.

    1990-01-01

    The Reactor Maintenance's Machinery Vibration Monitoring Program (MVMP) plays an essential role in ensuring the safe operation of the three Production Reactors at the Westinghouse Savannah River Company (WRSC) Savannah River Site (SRS). This program has increased machinery availability and reduced maintenance cost by the early detection and determination of machinery problems. This paper presents the Reactor Maintenance's Machinery Vibration Monitoring Program, which has been documented based on Electric Power Research Institute's (EPRI) NP-5311, Utility Machinery Monitoring Guide, and some examples of the successes that it has enjoyed

  5. Review of present groundwater monitoring programs at the Nevada Test Site

    International Nuclear Information System (INIS)

    Hershey, R.L.; Gillespie, D.

    1993-09-01

    Groundwater monitoring at the Nevada Test Site (NTS) is conducted to detect the presence of radionuclides produced by underground nuclear testing and to verify the quality and safety of groundwater supplies as required by the State of Nevada and federal regulations, and by U.S. Department of Energy (DOE) Orders. Groundwater is monitored at water-supply wells and at other boreholes and wells not specifically designed or located for traditional groundwater monitoring objectives. Different groundwater monitoring programs at the NTS are conducted by several DOE Nevada Operations Office (DOE/NV) contractors. Presently, these individual groundwater monitoring programs have not been assessed or administered under a comprehensive planning approach. Redundancy exists among the programs in both the sampling locations and the constituents analyzed. Also, sampling for certain radionuclides is conducted more frequently than required. The purpose of this report is to review the existing NTS groundwater monitoring programs and make recommendations for modifying the programs so a coordinated, streamlined, and comprehensive monitoring effort may be achieved by DOE/NV. This review will be accomplished in several steps. These include: summarizing the present knowledge of the hydrogeology of the NTS and the potential radionuclide source areas for groundwater contamination; reviewing the existing groundwater monitoring programs at the NTS; examining the rationale for monitoring and the constituents analyzed; reviewing the analytical methods used to quantify tritium activity; discussing monitoring network design criteria; and synthesizing the information presented and making recommendations based on the synthesis. This scope of work was requested by the DOE/NV Hydrologic Resources Management Program (HRMP) and satisfies the 1993 (fiscal year) HRMP Groundwater Monitoring Program Review task

  6. 78 FR 50399 - Spectrum Monitoring Pilot Program

    Science.gov (United States)

    2013-08-19

    ... 130809703-3703-01] RIN 0660-XC007 Spectrum Monitoring Pilot Program AGENCY: National Telecommunications and... National Telecommunications and Information Administration (NTIA) to design and conduct a pilot program to... investment for a two-year pilot program to determine the benefits of an automated spectrum measurement and...

  7. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  8. Risk monitor-a tool for computer aided risk assessment for NPPs

    International Nuclear Information System (INIS)

    Vinod, Gopika; Saraf, R.K.; Babar, A.K.; Kushwaha, H.S.; Hadap, Nikhil

    2001-01-01

    Considerable changes occur in components status and system design and subsequent operation due to changes in plant configuration and their operating procedures. These changes are organised because some components are randomly down and other can be planned for test, maintenance and repair. This results in a fluctuation of risk level over operating time, which is termed as risk profile. Probabilistic Safety Assessment (PSA) is an analytical technique for assessing the risk by integrating diverse aspects of design and operation of a Nuclear Power Plant. Risk can be defined as the product of the probability of an accident and the consequences from that accident. Reactor Safety Division of BARC has developed PC based tool, which can assess the risk profile. This package can be used to optimise the operation in Nuclear Power Plants with respect to a minimum risk level over the operating time, and is termed as Risk Monitor. Risk Monitor is user friendly and can re-evaluate core damage frequency for changes in component status, test interval, initiating event frequency etc. Plant restoration advice, when the plant is in high risk configuration, current status of all plant equipment, and equipment prioritization are also provided by the package. (author)

  9. 40 CFR 52.1080 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... Stations (PAMS) Program. 52.1080 Section 52.1080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 52.1080 Photochemical Assessment Monitoring Stations (PAMS) Program. On March 24, 1994 Maryland's... Assessment Monitoring Stations (PAMS) Program as a state implementation plan (SIP) revision, as required by...

  10. 40 CFR 52.2426 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... Stations (PAMS) Program. 52.2426 Section 52.2426 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 52.2426 Photochemical Assessment Monitoring Stations (PAMS) Program. On November 23, 1994 Virginia's... Photochemical Assessment Monitoring Stations (PAMS) Program as a state implementation plan (SIP) revision, as...

  11. Evaluation of test intervals strategies with a risk monitor

    International Nuclear Information System (INIS)

    Soerman, J.

    2005-01-01

    The Swedish nuclear power utility Oskarshamn Power Group (OKG), is investigating how the use of a risk monitor can facilitate and improve risk-informed decision-making at their nuclear power plants. The intent is to evaluate if risk-informed decision-making can be accepted. A pilot project was initiated and carried out in 2004. The project included investigating if a risk monitor can be used for optimising test intervals for diesel- and gas turbine generators with regard to risk level. The Oskarhamn 2 (O2), PSA Level 1 model was converted into a risk monitor using RiskSpectrum RiskWatcher (RSRW) software. The converted PSA model included the complete PSA model for the power operation mode. RSRW then performs a complete requantification for every analysis. Time dependent reliability data are taken into account, i.e. a shorter test interval will increases the components availability (possibility to e.g. start on demand). The converted O2 model was then used to investigate whether it would be possible to balance longer test intervals for diesel generators, gas turbine generators and high pressure injection system with shorter test intervals for the low pressure injection system, while maintaining a low risk level at the plant. The results show that a new mixture of test intervals can be implemented with only marginally changes in the risk calculated with the risk monitor model. The results indicate that the total number of test activities for the systems included in the pilot study could be reduced by 20% with a maintained level of risk. A risk monitor taking into account the impact from test intervals in availability calculations for components is well suited for evaluation of test interval strategies. It also enables the analyst to evaluate the risk level over a period of time including the impact the actual status of the plant may have on the risk level. (author)

  12. National environmental radiation monitoring program: towards formulating policy on radioactive waste management

    International Nuclear Information System (INIS)

    Sukiman Sarmani

    2002-01-01

    Though Malaysia has no nuclear power station, but the management of its low level radioactive waste generated from industrial activities involves most of the same issues that must be considered in countries with nuclear power. These include public consultation at all stages, an open approach, high level scientific and engineering input and political decision by the Government. A carefully planned approach, which involves the public and gives time to build trust and confidence, is necessary for success. It is also pertinent to establish accurate and reliable data on environmental radiation to accurately assess possible risk. This is where a national monitoring program on environmental radiation is very important. While accurate data will help formulate sound policy on radioactive waste management, it should also be readily available to the public to gain support and acceptance. This paper presents arguments on the importance of a national monitoring program for environmental radiation as an input for formulating a policy on radioactive waste management in Malaysia. (Author)

  13. Radiation Monitoring - A Key Element in a Nuclear Power Program

    International Nuclear Information System (INIS)

    Hussein, A.S.; El-dally, T.A.

    2008-01-01

    For a nuclear power plant, radiation is especially of great concern to the public and the environment. Therefore, a radiation monitoring program is becoming a critical importance. This program covers all phases of the nuclear plant including preoperational, normal operation, accident and decommissioning. The fundamental objective of radiation monitoring program is to ensure that the health and safety of public inside and around the plant and to confirm the radiation doses are below the dose limits for workers and the public. This paper summarizes the environmental radiation monitoring program for a nuclear power plant

  14. The future of monitoring in clinical research - a holistic approach: linking risk-based monitoring with quality management principles.

    Science.gov (United States)

    Ansmann, Eva B; Hecht, Arthur; Henn, Doris K; Leptien, Sabine; Stelzer, Hans Günther

    2013-01-01

    Since several years risk-based monitoring is the new "magic bullet" for improvement in clinical research. Lots of authors in clinical research ranging from industry and academia to authorities are keen on demonstrating better monitoring-efficiency by reducing monitoring visits, monitoring time on site, monitoring costs and so on, always arguing with the use of risk-based monitoring principles. Mostly forgotten is the fact, that the use of risk-based monitoring is only adequate if all mandatory prerequisites at site and for the monitor and the sponsor are fulfilled.Based on the relevant chapter in ICH GCP (International Conference on Harmonisation of technical requirements for registration of pharmaceuticals for human use - Good Clinical Practice) this publication takes a holistic approach by identifying and describing the requirements for future monitoring and the use of risk-based monitoring. As the authors are operational managers as well as QA (Quality Assurance) experts, both aspects are represented to come up with efficient and qualitative ways of future monitoring according to ICH GCP.

  15. Program of telluric lines monitoring

    Directory of Open Access Journals (Sweden)

    Vince I.

    2006-01-01

    Full Text Available A new observational program of telluric lines monitoring was introduced at Belgrade Astronomical Observatory. The ultimate goal of this program is to investigate the properties of Earth’s atmosphere through modeling the observed profiles of telluric lines. The program is intend to observe infrared molecular oxygen lines that were selected according to spectral sensitivity of the available CCD camera. In this paper we give the initial and the final selection criteria for spectral lines included in the program the description of equipment and procedures used for observations and reduction, a review of preliminary observational results with the estimated precision, and a short discussion on the comparison of the theoretical predictions and the measurements.

  16. The Savannah River Site's Groundwater Monitoring Program

    International Nuclear Information System (INIS)

    1992-01-01

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results

  17. ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA ECOLOGICAL SERVICES

    2006-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

  18. Automated size-specific CT dose monitoring program: Assessing variability in CT dose

    International Nuclear Information System (INIS)

    Christianson, Olav; Li Xiang; Frush, Donald; Samei, Ehsan

    2012-01-01

    Purpose: The potential health risks associated with low levels of ionizing radiation have created a movement in the radiology community to optimize computed tomography (CT) imaging protocols to use the lowest radiation dose possible without compromising the diagnostic usefulness of the images. Despite efforts to use appropriate and consistent radiation doses, studies suggest that a great deal of variability in radiation dose exists both within and between institutions for CT imaging. In this context, the authors have developed an automated size-specific radiation dose monitoring program for CT and used this program to assess variability in size-adjusted effective dose from CT imaging. Methods: The authors radiation dose monitoring program operates on an independent health insurance portability and accountability act compliant dosimetry server. Digital imaging and communication in medicine routing software is used to isolate dose report screen captures and scout images for all incoming CT studies. Effective dose conversion factors (k-factors) are determined based on the protocol and optical character recognition is used to extract the CT dose index and dose-length product. The patient's thickness is obtained by applying an adaptive thresholding algorithm to the scout images and is used to calculate the size-adjusted effective dose (ED adj ). The radiation dose monitoring program was used to collect data on 6351 CT studies from three scanner models (GE Lightspeed Pro 16, GE Lightspeed VCT, and GE Definition CT750 HD) and two institutions over a one-month period and to analyze the variability in ED adj between scanner models and across institutions. Results: No significant difference was found between computer measurements of patient thickness and observer measurements (p= 0.17), and the average difference between the two methods was less than 4%. Applying the size correction resulted in ED adj that differed by up to 44% from effective dose estimates that were not

  19. Oil Sands Regional Aquatics Monitoring Program (RAMP) 5 year report

    International Nuclear Information System (INIS)

    Fawcett, K.

    2003-05-01

    This 5 year report outlined and examined the activities of the Regional Aquatics Monitoring Program (RAMP) from its introduction in 1997 up to 2001. The RAMP is a multi-stakeholder program comprised of industry and government representatives as well as members of aboriginal groups and environmental organizations. The objectives of RAMP are to monitor aquatic environments in the oil sands region in order to allow for assessment of regional trends and cumulative effects, as well as to provide baseline data against which impact predictions of recent environmental impact assessments can be verified. Scientific programs conducted as part of RAMP during the 5-year period included water quality and sediment quality analyses; fish monitoring; benthic communities monitoring; water quality and aquatic vegetation analyses of wetlands; and hydrology and climate monitoring. RAMP's programs have expanded annually in scope as a result of increased oil sands development in the region. This report provided outlines of RAMP's individual program objectives and organizational structures, as well as details of all studies conducted for each year. Data were collected for all major study areas were presented, and program methodologies for assessing and identifying trends were outlined. refs., tabs., figs

  20. Groundwater monitoring of hydraulic fracturing in California: Recommendations for permit-required monitoring

    Science.gov (United States)

    Esser, B. K.; Beller, H. R.; Carroll, S.; Cherry, J. A.; Jackson, R. B.; Jordan, P. D.; Madrid, V.; Morris, J.; Parker, B. L.; Stringfellow, W. T.; Varadharajan, C.; Vengosh, A.

    2015-12-01

    California recently passed legislation mandating dedicated groundwater quality monitoring for new well stimulation operations. The authors provided the State with expert advice on the design of such monitoring networks. Factors that must be considered in designing a new and unique groundwater monitoring program include: Program design: The design of a monitoring program is contingent on its purpose, which can range from detection of individual well leakage to demonstration of regional impact. The regulatory goals for permit-required monitoring conducted by operators on a well-by-well basis will differ from the scientific goals of a regional monitoring program conducted by the State. Vulnerability assessment: Identifying factors that increase the probability of transport of fluids from the hydrocarbon target zone to a protected groundwater zone enables the intensity of permit-required monitoring to be tiered by risk and also enables prioritization of regional monitoring of groundwater basins based on vulnerability. Risk factors include well integrity; proximity to existing wellbores and geologic features; wastewater disposal; vertical separation between the hydrocarbon and groundwater zones; and site-specific hydrogeology. Analyte choice: The choice of chemical analytes in a regulatory monitoring program is guided by the goals of detecting impact, assuring public safety, preventing resource degradation, and minimizing cost. Balancing these goals may be best served by tiered approach in which targeted analysis of specific chemical additives is triggered by significant changes in relevant but more easily analyzed constituents. Such an approach requires characterization of baseline conditions, especially in areas with long histories of oil and gas development. Monitoring technology: Monitoring a deep subsurface process or a long wellbore is more challenging than monitoring a surface industrial source. The requirement for monitoring multiple groundwater aquifers across

  1. The Argonne Radiological Impact Program (ARIP). Part II. MONITOR: A Program and Data Base for Retrieval and Utilization of Pollutant Monitoring Data

    Energy Technology Data Exchange (ETDEWEB)

    Eckerman, Keith F.; Stowe, Ralph F.; Frigerio, Norman A.

    1977-02-01

    The Argonne Radiological Impact Program (ARIP) is an ongoing project of the Laboratory's Division of Environmental Impact Studies that aims at developing methodologies for assessing the carcinogenic hazards associated with nuclear power development. The project's first report (ANL/ES-26, Part I), published in September.l973, discussed models of radiation carcinogenesis and the contribution of U .. S. background radiation levels to hazardous dose rates. The current report (Part II) treats the storage and access of available data on radiation and radioactivity levels in the u. S. A compute-r code. (the MONITOR program) is prf!sented, which can serve as a ready-access data. bank for all monitoring data acquired over the past two decades. The MONITOR program currently stores data on monitoring locations, types of monitoring efforts, and types of monitoring data. reported in Radiation Data and Reports by the various state and federal ne-tworks; expansion of this data base to include nuclear power facilities in operation or on order is ongoing ·. The MONITOR code retrieves information within a search radius, or rectangl.e ,. circumscribed by parameters of latitude and longitude, and l:.ists or maps the data_as: requested. The code, with examples, is given in full in the report ..

  2. Development and Implementation of the Ebola Traveler Monitoring Program and Clinical Outcomes of Monitored Travelers during October - May 2015, Minnesota.

    Directory of Open Access Journals (Sweden)

    Aaron DeVries

    aged <18 years. Thirteen of 256 women of reproductive age (5% were pregnant. The country of passport issuance was known for 720 of the travelers. The majority of monitored travelers (478 [66%] used a non-U.S. passport including 442 (61% Liberian nationals. A total of 772 (99% travelers were "low (but not zero" risk; 11 (1% were "some" risk. Among monitored travelers, 43 (5% experienced illness symptoms; 29 (67% had a symptom consistent with EVD. Two were tested for Ebola virus disease and had negative results. Most frequently reported symptoms were fever (20/43, 47% and abdominal pain (12/43, 28%. During evaluation, 16 (37% of 43 travelers reported their symptoms began prior to travel; chronic health conditions in 24 travelers including tumors/cancer, pregnancy, and orthopedic conditions were most common. Infectious causes in 19 travelers included upper respiratory infection, malaria, and gastrointestinal infections.Prior to 2014, no similar active monitoring program for travelers had been performed in Minnesota; assessment and management of symptomatic travelers was a new activity for MDH. Ensuring safe entrance into healthcare was particularly challenging for children, and pregnant women, as well as those without an established connection to healthcare. Unnecessary inpatient evaluations were successfully avoided by close clinical follow-up by phone. Before similar monitoring programs are considered in the future, careful thought must be given to necessary resources and the impact on affected populations, public health, and the healthcare system.

  3. Development and Implementation of the Ebola Traveler Monitoring Program and Clinical Outcomes of Monitored Travelers during October - May 2015, Minnesota.

    Science.gov (United States)

    DeVries, Aaron; Talley, Pamela; Sweet, Kristin; Kline, Susan; Stinchfield, Patricia; Tosh, Pritish; Danila, Richard

    2016-01-01

    <18 years. Thirteen of 256 women of reproductive age (5%) were pregnant. The country of passport issuance was known for 720 of the travelers. The majority of monitored travelers (478 [66%]) used a non-U.S. passport including 442 (61%) Liberian nationals. A total of 772 (99%) travelers were "low (but not zero)" risk; 11 (1%) were "some" risk. Among monitored travelers, 43 (5%) experienced illness symptoms; 29 (67%) had a symptom consistent with EVD. Two were tested for Ebola virus disease and had negative results. Most frequently reported symptoms were fever (20/43, 47%) and abdominal pain (12/43, 28%). During evaluation, 16 (37%) of 43 travelers reported their symptoms began prior to travel; chronic health conditions in 24 travelers including tumors/cancer, pregnancy, and orthopedic conditions were most common. Infectious causes in 19 travelers included upper respiratory infection, malaria, and gastrointestinal infections. Prior to 2014, no similar active monitoring program for travelers had been performed in Minnesota; assessment and management of symptomatic travelers was a new activity for MDH. Ensuring safe entrance into healthcare was particularly challenging for children, and pregnant women, as well as those without an established connection to healthcare. Unnecessary inpatient evaluations were successfully avoided by close clinical follow-up by phone. Before similar monitoring programs are considered in the future, careful thought must be given to necessary resources and the impact on affected populations, public health, and the healthcare system.

  4. APCAL1: Beam Position Monitor Program

    Energy Technology Data Exchange (ETDEWEB)

    Early, R.A.

    1979-12-01

    APCAL1 is an applications program operational on the PEP MODCOMP IV computer for the purpose of converting beam position monitor (BPM) button voltage readings to x,y coordinates. Calibration information and the BPM readings are read from the MODCOMP IV data base. Corresponding x,y coordinates are written in the data base for use by other programs. APCAL1 is normally activated by another program but can be activated by a touch panel for checkout purposes.

  5. The Savannah River Site's groundwater monitoring program

    International Nuclear Information System (INIS)

    1991-01-01

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results

  6. U.S. Food and Drug Administration's dioxin monitoring program

    Energy Technology Data Exchange (ETDEWEB)

    South, P.; S. Kathleen Egan; Troxell, T.; P. Michael Bolger [U.S. Food and Drug Administration, Center for Food Safety and Applied Nutrition, College Park (United States)

    2004-09-15

    Dioxin-like compounds (DLCs) are a group of environmental contaminants whose primary route of human exposure occurs via the consumption of fatty foods of animal origin. Recent safety risk assessments conducted by national and international organizations broadly agree that risk management actions should be developed to decrease DLC exposure. Since the mid-1990s, the U.S. Food and Drug Administration (FDA) has tested specific foods with the goal of describing and reducing DLC exposure. In 2001, FDA developed a strategy for DLCs (http://vm.cfsan.fda.gov/{proportional_to}lrd/dioxstra.html) and substantially expanded its dioxin monitoring program to obtain more comprehensive data on background levels of DLCs in specific food and feed samples as well as to identify and reduce pathways of DLC contamination. FDA's dioxin monitoring program analyzes food collected under its Total Diet Study (TDS) and food and feed from targeted sampling. The TDS is FDA's ongoing market basket survey of approximately 280 core foods in the U.S. food supply. FDA targeted sampling collects and analyzes foods suspected of having both higher DLC levels and more variability in those levels than other foods. The contribution of dietary DLCs to overall exposure and the possible introduction of DLCs in animalbased food via the use of particular feed components was recently identified by the National Academy of Sciences Committee on the Implications of Dioxin in the Food Supply and confirmed FDA's approach articulated in its dioxin strategy.

  7. A risk-adjusted O-E CUSUM with monitoring bands for monitoring medical outcomes.

    Science.gov (United States)

    Sun, Rena Jie; Kalbfleisch, John D

    2013-03-01

    In order to monitor a medical center's survival outcomes using simple plots, we introduce a risk-adjusted Observed-Expected (O-E) Cumulative SUM (CUSUM) along with monitoring bands as decision criterion.The proposed monitoring bands can be used in place of a more traditional but complicated V-shaped mask or the simultaneous use of two one-sided CUSUMs. The resulting plot is designed to simultaneously monitor for failure time outcomes that are "worse than expected" or "better than expected." The slopes of the O-E CUSUM provide direct estimates of the relative risk (as compared to a standard or expected failure rate) for the data being monitored. Appropriate rejection regions are obtained by controlling the false alarm rate (type I error) over a period of given length. Simulation studies are conducted to illustrate the performance of the proposed method. A case study is carried out for 58 liver transplant centers. The use of CUSUM methods for quality improvement is stressed. Copyright © 2013, The International Biometric Society.

  8. Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    2005-03-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information required for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.

  9. A plan for the North American Bat Monitoring Program (NABat)

    Science.gov (United States)

    Loeb, Susan C.; Rodhouse, Thomas J.; Ellison, Laura E.; Lausen, Cori L.; Reichard, Jonathan D.; Irvine, Kathryn M.; Ingersoll, Thomas E.; Coleman, Jeremy; Thogmartin, Wayne E.; Sauer, John R.; Francis, Charles M.; Bayless, Mylea L.; Stanley, Thomas R.; Johnson, Douglas H.

    2015-01-01

    The purpose of the North American Bat Monitoring Program (NABat) is to create a continent-wide program to monitor bats at local to rangewide scales that will provide reliable data to promote effective conservation decisionmaking and the long-term viability of bat populations across the continent. This is an international, multiagency program. Four approaches will be used to gather monitoring data to assess changes in bat distributions and abundances: winter hibernaculum counts, maternity colony counts, mobile acoustic surveys along road transects, and acoustic surveys at stationary points. These monitoring approaches are described along with methods for identifying species recorded by acoustic detectors. Other chapters describe the sampling design, the database management system (Bat Population Database), and statistical approaches that can be used to analyze data collected through this program.

  10. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    CERN Document Server

    Cooper, J R

    2000-01-01

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual.

  11. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    International Nuclear Information System (INIS)

    COOPER, J.R.

    2000-01-01

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual

  12. Management of nonregulatory driven program risks

    International Nuclear Information System (INIS)

    Nielsen, R.R.; Hutterman, L.L.

    1995-01-01

    Evaluation of program risk is a significant part of any environmental restoration (ER) activity. While significant efforts have been made to assess risk to human health and the environment, program risks outside of CERCLA are handled on a fire drill basis. This paper explains a process that looks at program risk, directs mitigation efforts in the most useful path, and focuses corrective actions to obtain the most benefits from the resources used

  13. Risk Monitoring through Traceability Information Model

    OpenAIRE

    Juan P. Zamora; Wilson Adarme; Laura Palacios

    2012-01-01

    This paper shows a traceability framework for supply risk monitoring, beginning with the identification, analysis, and evaluation of the supply chain risk and focusing on the supply operations of the Health Care Institutions with oncology services in Bogota, Colombia. It includes a brief presentation of the state of the art of the Supply Chain Risk Management and traceability systems in logistics operations, and it concludes with the methodology to integrate the SCRM model with the traceabili...

  14. Lake Roosevelt Fisheries Monitoring Program; 1988-1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L.; Scholz, Allan T.; Griffith, James R.

    1990-10-01

    In the Northwest Power Planning Council's 1987 Columbia River Basin Fish and Wildlife Program (NPPC 1987), the Council directed the Bonneville Power Administration (BPA) to construct two kokanee salmon (Oncorhynchus nerka) hatcheries as partial mitigation for the loss of anadromous salmon and steelhead incurred by construction of Grand Coulee Dam [Section 903 (g)(l)(C)]. The hatcheries will produce kokanee salmon for outplanting into Lake Roosevelt as well as rainbow trout (Oncorhynchus mykiss) for the Lake Roosevelt net-pen program. In section 903 (g)(l)(E), the Council also directed BPA to fund a monitoring program to evaluate the effectiveness of the kokanee hatcheries. The monitoring program included the following components: (1) a year-round, reservoir-wide, creel survey to determine angler use, catch rates and composition, and growth and condition of fish; (2) assessment of kokanee, rainbow, and walleye (Stizostedion vitreum) feeding habits and densities of their preferred prey, and; (3) a mark and recapture study designed to assess the effectiveness of different locations where hatchery-raised kokanee and net pen reared rainbow trout are released. The above measures were adopted by the Council based on a management plan, developed by the Upper Columbia United Tribes Fisheries Center, Spokane Indian Tribe, Colville Confederated Tribes, Washington Department of Wildlife, and National Park Service, that examined the feasibility of restoring and enhancing Lake Roosevelt fisheries (Scholz et al. 1986). In July 1988, BPA entered into a contract with the Spokane Indian Tribe to initiate the monitoring program. The projected duration of the monitoring program is through 1995. This report contains the results of the monitoring program from August 1988 to December 1989.

  15. Plant performance monitoring program at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Kavsek, D.

    2004-01-01

    A high level of nuclear safety and plant reliability results from the complex interaction of a good design, operational safety and human performance. This is the reason for establishing a set of operational plant safety performance indicators, to enable monitoring of both plant performance and progress. Performance indicators are also used for setting challenging targets and goals for improvement, to gain additional perspective on performance relative to other plants and to provide an indication of a potential need to adjust priorities and resources to achieve improved overall plant performance. A specific indicator trend over a certain period can provide an early warning to plant management to evaluate the causes behind the observed changes. In addition to monitoring the changes and trends, it is also necessary to compare the indicators with identified targets and goals to evaluate performance strengths and weaknesses. Plant Performance Monitoring Program at Krsko NPP defines and ensures consistent collection, processing, analysis and use of predefined relevant plant operational data, providing a quantitative indication of nuclear power plant performance. When the program was developed, the conceptual framework described in IAEA TECDOC-1141 Operational Safety Performance Indicators for Nuclear Power Plants was used as its basis in order to secure that a reasonable set of quantitative indications of operational safety performance would be established. Safe, conservative, cautious and reliable operation of the Krsko NPP is a common goal for all plant personnel. It is provided by continuous assurance of both health and safety of the public and employees according to the plant policy stated in program MD-1 Notranje usmeritve in cilji NEK, which is the top plant program. Establishing a program of monitoring and assessing operational plant safety performance indicators represents effective safety culture of plant personnel.(author)

  16. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-06-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  17. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    Energy Technology Data Exchange (ETDEWEB)

    COOPER, J.R.

    2000-04-17

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual.

  18. Sandia National Laboratories, California Environmental Monitoring Program annual report for 2011.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2011-03-01

    The annual program report provides detailed information about all aspects of the SNL/California Environmental Monitoring Program. It functions as supporting documentation to the SNL/California Environmental Management System Program Manual. The 2010 program report describes the activities undertaken during the previous year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/California.

  19. Overview of four prescription monitoring/review programs in Canada.

    Science.gov (United States)

    Furlan, Andrea D; MacDougall, Peter; Pellerin, Denise; Shaw, Karen; Spitzig, Doug; Wilson, Galt; Wright, Janet

    2014-01-01

    Prescription monitoring or review programs collect information about prescription and dispensing of controlled substances for the purposes of monitoring, analysis and education. In Canada, it is the responsibility of the provincial institutions to organize, maintain and run such programs. To describe the characteristics of four provincial programs that have been in place for >6 years. The managers of the prescription monitoring⁄review programs of four provinces (British Columbia, Alberta, Saskatchewan and Nova Scotia) were invited to present at a symposium at the Canadian Pain Society in May 2012. In preparation for the symposium, one author collected and summarized the information. Three provinces have a mix of review and monitoring programs; the program in British Columbia is purely for review and education. All programs include controlled substances (narcotics, barbiturates and psychostimulants); however, other substances are differentially included among the programs: anabolic steroids are included in Saskatchewan and Nova Scotia; and cannabinoids are included in British Columbia and Nova Scotia. Access to the database is available to pharmacists in all provinces. Physicians need consent from patients in British Columbia, and only professionals registered with the program can access the database in Alberta. The definition of inappropriate prescribing and dispensing is not uniform. Double doctoring, double pharmacy and high-volume dispensing are considered to be red flags in all programs. There is variability among Canadian provinces in managing prescription monitoring⁄review programs.

  20. Monitoring multiple species: Estimating state variables and exploring the efficacy of a monitoring program

    Science.gov (United States)

    Mattfeldt, S.D.; Bailey, L.L.; Grant, E.H.C.

    2009-01-01

    Monitoring programs have the potential to identify population declines and differentiate among the possible cause(s) of these declines. Recent criticisms regarding the design of monitoring programs have highlighted a failure to clearly state objectives and to address detectability and spatial sampling issues. Here, we incorporate these criticisms to design an efficient monitoring program whose goals are to determine environmental factors which influence the current distribution and measure change in distributions over time for a suite of amphibians. In designing the study we (1) specified a priori factors that may relate to occupancy, extinction, and colonization probabilities and (2) used the data collected (incorporating detectability) to address our scientific questions and adjust our sampling protocols. Our results highlight the role of wetland hydroperiod and other local covariates in the probability of amphibian occupancy. There was a change in overall occupancy probabilities for most species over the first three years of monitoring. Most colonization and extinction estimates were constant over time (years) and space (among wetlands), with one notable exception: local extinction probabilities for Rana clamitans were lower for wetlands with longer hydroperiods. We used information from the target system to generate scenarios of population change and gauge the ability of the current sampling to meet monitoring goals. Our results highlight the limitations of the current sampling design, emphasizing the need for long-term efforts, with periodic re-evaluation of the program in a framework that can inform management decisions.

  1. Ecological Monitoring and Compliance Program Fiscal Year 2003 Report

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    2003-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2003.

  2. Active Sites Environmental Monitoring Program. FY 1993: Annual report

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Ashwood, T.L.; Hicks, D.S.; Marsh, J.D.

    1994-08-01

    This report continues a series of annual and semiannual reports that present the results of the Active Sites Environmental Monitoring Program (ASEMP) monitoring activities. The report details monitoring data for fiscal year (FY) 1993 and is divided into three major areas: SWSA 6 [including tumulus pads, Interim Waste Management Facility (IWMF), and other sites], the low-level Liquid-Waste Solidification Project (LWSP), and TRU-waste storage facilities in SWSA 5 N. The detailed monitoring methodology is described in the second revision of the ASEMP program plan. This report also presents a summary of the methodology used to gather data for each major area along with the results obtained during FY 1993

  3. Quantitative risk trends deriving from PSA-based event analyses. Analysis of results from U.S.NRC's accident sequence precursor program

    International Nuclear Information System (INIS)

    Watanabe, Norio

    2004-01-01

    The United States Nuclear Regulatory Commission (U.S.NRC) has been carrying out the Accident Sequence Precursor (ASP) Program to identify and categorize precursors to potential severe core damage accident sequences using the probabilistic safety assessment (PSA) technique. The ASP Program has identified a lot of risk significant events as precursors that occurred at U.S. nuclear power plants. Although the results from the ASP Program include valuable information that could be useful for obtaining and characterizing risk significant insights and for monitoring risk trends in nuclear power industry, there are only a few attempts to determine and develop the trends using the ASP results. The present study examines and discusses quantitative risk trends for the industry level, using two indicators, that is, the occurrence frequency of precursors and the annual core damage probability, deriving from the results of the ASP analysis. It is shown that the core damage risk at U.S. nuclear power plants has been lowered and the likelihood of risk significant events has been remarkably decreasing. As well, the present study demonstrates that two risk indicators used here can provide quantitative information useful for examining and monitoring the risk trends and/or risk characteristics in nuclear power industry. (author)

  4. Monitoring activities review of the Radiological Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Ritter, P.D.

    1992-03-01

    The 1992 Monitoring Activities Review (MAR) is directed at the Radiological Environment Surveillance Program (RESP) activities at the Radioactive Waste Management Complex (RWMC) of Idaho Engineering Laboratory (INEL). MAR panelists studied RESP documents and discussed their concerns with Environmental Monitoring Unit (EMU) staff and other panel members. These concerns were subsequently consolidated into a collection of recommendations with supporting discussions. Recommendations focus on specific monitoring activities, as well as the overall program. The MAR report also contains pertinent comments that should not require further action

  5. Architecture and design of third Qinshan nuclear power plant risk monitor

    Energy Technology Data Exchange (ETDEWEB)

    Wang, F.; Li, Y.; Wang, J.; Wang, J.; Hu, L. [Inst. of Nuclear Energy Safety Technology, Chinese Academy of Sciences, Hefei, Anhui, 230031 (China); School of Nuclear Science and Technology, Univ. of Science and Technology of China, No.350 Shushanhu Road, Shushan District, Hefei, Anhui, 230031 (China)

    2012-07-01

    Risk monitor is a real-time analysis tool to determine the point-in-time risk based on actual plant configuration, which is an important application of PSA (Probabilistic Safety Assessment). In this study the status and development trend of risk monitor were investigated and a risk monitor named TQRM (Third Qinshan nuclear power plant Risk Monitor) was developed. The B/S architecture and the two key computing methods pre-solved and resolving PSA model method adopted in TQRM were introduced. The functions and technical features were also presented. Now TQRM has been on-line for more than one year and used in the operation and maintenance of TQNPP. The experience demonstrates that TQRM's results are accurate and real-time, the architecture is stable, and it could be extended and maintained conveniently for any other Risk-Informed Application. (authors)

  6. Monitoring and evaluation of green public procurement programs

    Energy Technology Data Exchange (ETDEWEB)

    Adell, Aure [Ecoinstitut, Barcelona (Spain); Schaefer, Bettina [Ecoinstitut, Barcelona (Spain); Ravi, Kavita [US Department of Energy, Washington, DC (United States); Corry, Jenny [Collaborative Labeling and Appliance Standards Program (United States)

    2013-10-15

    Effective procurement policies can help governments save considerable amounts of money while also reducing energy consumption. Additionally, private sector companies which purchase large numbers of energy-consuming devices can benefit from procurement policies that minimize life-cycle energy costs. Both public and private procurement programs offer opportunities to generate market-transforming demand for energy efficient appliances and lighting fixtures. In recent years, several governments have implemented policies to procure energy efficient products and services. When deploying these policies, efforts have focused on developing resources for implementation (guidelines, energy efficiency specifications for tenders, life cycle costing tools, training, etc.) rather than defining monitoring systems to track progress against the set objectives. Implementation resources are necessary to make effective policies; however, developing Monitoring and Evaluation (M and E) mechanisms are critical to ensure that the policies are effective. The purpose of this article is to provide policy makers and procurement officials with a preliminary map of existing approaches and key components to monitor Energy Efficient Procurement (EEP) programs in order to contribute to the improvement of their own systems. Case studies are used throughout the paper to illustrate promising approaches to improve the M and E of EEP programs, from the definition of the system or data collection to complementary instruments to improve both the monitoring response and program results.

  7. Using adaptive processes and adverse outcome pathways to develop meaningful, robust, and actionable environmental monitoring programs.

    Science.gov (United States)

    Arciszewski, Tim J; Munkittrick, Kelly R; Scrimgeour, Garry J; Dubé, Monique G; Wrona, Fred J; Hazewinkel, Rod R

    2017-09-01

    The primary goals of environmental monitoring are to indicate whether unexpected changes related to development are occurring in the physical, chemical, and biological attributes of ecosystems and to inform meaningful management intervention. Although achieving these objectives is conceptually simple, varying scientific and social challenges often result in their breakdown. Conceptualizing, designing, and operating programs that better delineate monitoring, management, and risk assessment processes supported by hypothesis-driven approaches, strong inference, and adverse outcome pathways can overcome many of the challenges. Generally, a robust monitoring program is characterized by hypothesis-driven questions associated with potential adverse outcomes and feedback loops informed by data. Specifically, key and basic features are predictions of future observations (triggers) and mechanisms to respond to success or failure of those predictions (tiers). The adaptive processes accelerate or decelerate the effort to highlight and overcome ignorance while preventing the potentially unnecessary escalation of unguided monitoring and management. The deployment of the mutually reinforcing components can allow for more meaningful and actionable monitoring programs that better associate activities with consequences. Integr Environ Assess Manag 2017;13:877-891. © 2017 The Authors. Integrated Environmental Assessment and Management Published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management Published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  8. 14 CFR 152.319 - Monitoring and reporting of program performance.

    Science.gov (United States)

    2010-01-01

    ... performance. 152.319 Section 152.319 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.319 Monitoring and reporting of program performance. (a) The sponsor or planning agency shall monitor performance...

  9. A Risk-Based Multi-Objective Optimization Concept for Early-Warning Monitoring Networks

    Science.gov (United States)

    Bode, F.; Loschko, M.; Nowak, W.

    2014-12-01

    Groundwater is a resource for drinking water and hence needs to be protected from contaminations. However, many well catchments include an inventory of known and unknown risk sources which cannot be eliminated, especially in urban regions. As matter of risk control, all these risk sources should be monitored. A one-to-one monitoring situation for each risk source would lead to a cost explosion and is even impossible for unknown risk sources. However, smart optimization concepts could help to find promising low-cost monitoring network designs.In this work we develop a concept to plan monitoring networks using multi-objective optimization. Our considered objectives are to maximize the probability of detecting all contaminations and the early warning time and to minimize the installation and operating costs of the monitoring network. A qualitative risk ranking is used to prioritize the known risk sources for monitoring. The unknown risk sources can neither be located nor ranked. Instead, we represent them by a virtual line of risk sources surrounding the production well.We classify risk sources into four different categories: severe, medium and tolerable for known risk sources and an extra category for the unknown ones. With that, early warning time and detection probability become individual objectives for each risk class. Thus, decision makers can identify monitoring networks which are valid for controlling the top risk sources, and evaluate the capabilities (or search for least-cost upgrade) to also cover moderate, tolerable and unknown risk sources. Monitoring networks which are valid for the remaining risk also cover all other risk sources but the early-warning time suffers.The data provided for the optimization algorithm are calculated in a preprocessing step by a flow and transport model. Uncertainties due to hydro(geo)logical phenomena are taken into account by Monte-Carlo simulations. To avoid numerical dispersion during the transport simulations we use the

  10. Automated size-specific CT dose monitoring program: Assessing variability in CT dose

    Energy Technology Data Exchange (ETDEWEB)

    Christianson, Olav; Li Xiang; Frush, Donald; Samei, Ehsan [Clinical Imaging Physics Group, Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 and Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 (United States); Clinical Imaging Physics Group, Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 (United States); Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 (United States) and Carl E. Ravin Advanced Imaging Laboratories, Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 (United States); Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 (United States); Clinical Imaging Physics Group, Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 (United States); Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 (United States); Carl E. Ravin Advanced Imaging Laboratories, Department of Radiology, Duke University Medical Center, Durham, North Carolina 27705 (United States); Medical Physics Graduate Program, Duke University, Durham, North Carolina 27705 (United States); Department of Physics, Duke University, Durham, North Carolina 27710 (United States); and Department of Biomedical Engineering, Duke University, Durham, North Carolina 27708 (United States)

    2012-11-15

    Purpose: The potential health risks associated with low levels of ionizing radiation have created a movement in the radiology community to optimize computed tomography (CT) imaging protocols to use the lowest radiation dose possible without compromising the diagnostic usefulness of the images. Despite efforts to use appropriate and consistent radiation doses, studies suggest that a great deal of variability in radiation dose exists both within and between institutions for CT imaging. In this context, the authors have developed an automated size-specific radiation dose monitoring program for CT and used this program to assess variability in size-adjusted effective dose from CT imaging. Methods: The authors radiation dose monitoring program operates on an independent health insurance portability and accountability act compliant dosimetry server. Digital imaging and communication in medicine routing software is used to isolate dose report screen captures and scout images for all incoming CT studies. Effective dose conversion factors (k-factors) are determined based on the protocol and optical character recognition is used to extract the CT dose index and dose-length product. The patient's thickness is obtained by applying an adaptive thresholding algorithm to the scout images and is used to calculate the size-adjusted effective dose (ED{sub adj}). The radiation dose monitoring program was used to collect data on 6351 CT studies from three scanner models (GE Lightspeed Pro 16, GE Lightspeed VCT, and GE Definition CT750 HD) and two institutions over a one-month period and to analyze the variability in ED{sub adj} between scanner models and across institutions. Results: No significant difference was found between computer measurements of patient thickness and observer measurements (p= 0.17), and the average difference between the two methods was less than 4%. Applying the size correction resulted in ED{sub adj} that differed by up to 44% from effective dose

  11. A synthesis of evaluation monitoring projects by the forest health monitoring program (1998-2007)

    Science.gov (United States)

    William A. Bechtold; Michael J. Bohne; Barbara L. Conkling; Dana L. Friedman

    2012-01-01

    The national Forest Health Monitoring Program of the Forest Service, U.S. Department of Agriculture, has funded over 200 Evaluation Monitoring projects. Evaluation Monitoring is designed to verify and define the extent of deterioration in forest ecosystems where potential problems have been identified. This report is a synthesis of results from over 150 Evaluation...

  12. Liquid Effluent Monitoring Program at the Pacific Northwest Laboratory

    International Nuclear Information System (INIS)

    Ballinger, M.Y.

    1995-05-01

    Pacific Northwest Laboratory (PNL) is conducting a program to monitor the waste water from PNL-operated research and development facilities on the Hanford Site. The purpose of the program is to collect data to assess administrative controls and to determine whether discharges to the process sewer meet sewer criteria. Samples have been collected on a regular basis from the major PNL facilities on the Hanford Site since March 1994. A broad range of analyses has been performed to determine the primary constituents in the liquid effluent. The sampling program is briefly summarized in the paper. Continuous monitoring of pH, conductivity, and flow also provides data on the liquid effluent streams. In addition to sampling and monitoring, the program is evaluating the dynamics of the waste stream with dye studies and is evaluating the use of newer technologies for potential deployment in future sampling/monitoring efforts. Information collected to date has been valuable in determining sources of constituents that may be higher than the Waste Acceptance Criteria (WAC) for the Treated Effluent Disposal Facility (TEDF). This facility treats the waste streams before discharge to the Columbia River

  13. Overview of national bird population monitoring programs and databases

    Science.gov (United States)

    Gregory S. Butcher; Bruce Peterjohn; C. John Ralph

    1993-01-01

    A number of programs have been set up to monitor populations of nongame migratory birds. We review these programs and their purposes and provide information on obtaining data or results from these programs. In addition, we review recommendations for improving these programs.

  14. The data collection component of the Hanford Meteorology Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; Islam, M.M.

    1988-09-01

    An intensive program of meteorological monitoring is in place at the US Department of Energy's Hanford Site. The Hanford Meteorology Monitoring Program involves the measurement, observation, and storage of various meteorological data; continuous monitoring of regional weather conditions by a staff of professional meteorologists; and around-the-clock forecasting of weather conditions for the Hanford Site. The objective of this report is to document the data collection component of the program. In this report, each meteorological monitoring site is discussed in detail. Each site's location and instrumentation are described and photographs are presented. The methods for processing and communicating data to the Hanford Meteorology Station are also discussed. Finally, the procedures followed to maintain and calibrate these instruments are presented. 2 refs., 83 figs., 15 tabs.

  15. Environmental monitoring program of CDTN

    International Nuclear Information System (INIS)

    Ferreira, E.G.

    1985-09-01

    This environmental monitoring program of CDTN aim to do a survey that permit to verify if the radioactive wastes release by CDTN agree with basic rudiments of radioprotection, evaluate the environmental impact, verify the adjustment of using proceedings to effluents control, to evaluate the maximum radiation doses that public persons will be able to get yearly. (C.M.) [pt

  16. Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Brandt, C.C.; Christensen, S.W.; Greeley, M.S.JR.; Hill, W.R.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.

    2000-09-01

    The revised Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted as required by the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995 and became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Science Division (ESD) at the Oak Ridge National Laboratory (ORNL) at the request of the Y-12 Plant. The revision to the BMAP plan is based on results of biological monitoring conducted during the period of 1985 to present. Details of the specific procedures used in the current routine monitoring program are provided; experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional bioaccumulation monitoring if results indicate unexpectedly high PCBs or Hg) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is still observed). The program scope will be re-evaluated annually. By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of Y-12 Plant operations (past and present) on the biota of EFPC and to document the ecological effects of remedial actions.

  17. Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States

    Science.gov (United States)

    Stepenuck, Kristine F.; Genskow, Kenneth D.

    2018-01-01

    A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.

  18. Integrated environmental monitoring program at the Hanford Site

    International Nuclear Information System (INIS)

    Jaquish, R.E.

    1990-08-01

    The US Department of Energy's Hanford Site, north of Richland, Washington, has a mission of defense production, waste management, environmental restoration, advanced reactor design, and research development. Environmental programs at Hanford are conducted by Pacific Northwest Laboratory (PNL) and the Westinghouse Hanford Company (WHC). The WHC environmental programs include the compliance and surveillance activities associated with site operations and waste management. The PNL environmental programs address the site-wide and the of-site areas. They include the environmental surveillance and the associated support activities, such as dose calculations, and also the monitoring of environmental conditions to comply with federal and state environmental regulations on wildlife and cultural resources. These are called ''independent environmental programs'' in that they are conducted completely separate from site operations. The Environmental Surveillance and Oversight Program consists of the following projects: surface environmental surveillance; ground-water surveillance; wildlife resources monitoring; cultural resources; dose overview; radiation standards and calibrations; meteorological and climatological services; emergency preparedness

  19. A recommended program of tritium monitoring research and development

    International Nuclear Information System (INIS)

    Nickerson, S.B.; Gerdingh, R.F.; Penfold, K.

    1982-10-01

    This report presents recommendations for programs of research and development in tritium monitoring instrumentation. These recommendations, if implemented, will offer Canadian industry the opportunity to develop marketable instruments. The major recommendations are to assist in the development and promotion of two Chalk River Nuclear Laboratories' monitors and an Ontario Hydro monitor, and to support research and development of a surface monitor

  20. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-17

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the fourth quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities; and serves as an official document of the analytical results.

  1. Review of four major environmental effects monitoring programs in the oil sands region

    International Nuclear Information System (INIS)

    Lott, E.O.; Jones, R.K.

    2010-10-01

    The lack of knowledge on current environmental effects monitoring programs for the mineable oil sands region generates a low public confidence in environment health monitoring and reporting programs for the oil sands operations. In 2010, the Oil Sands Research and Information Network (OSRIN) supervised a study reviewing the major environmental effects monitoring programs that are underway in the Regional Municipality of Wood Buffalo. Four main environmental effects monitoring and reporting organizations existing in the oil sands area were engaged to describe their programs through this study: Alberta Biodiversity Monitoring Institute (ABMI), Cumulative Environmental Management Association (CEMA), Regional Aquatic Monitoring Program (RAMP), Wood Buffalo Environmental Association (WBEA). These different organizations have specific roles in providing information, data and understanding of ecosystem effects. A one page visual summary of environmental effects monitoring in the oil sands area resulted from the information received from these organizations and detailed fact sheets were presented for each one of the programs. The report of this study also presents seven other environmental monitoring initiatives or organizations such as Alberta Environment and Environment Canada environmental effects monitoring program. The main observation that emerged from the review was the lack of detailed understanding shown by the stakeholders regarding the monitoring activities performed in the oil sands area. There is a lack of communication of the different programs that are conducted in the region. The study also pointed out that no efforts were put in cross-linking the various programs to be assured that every concerns related to environmental effects associated with oil sands operations were addressed. A better understanding of environmental effects and an improvement in public confidence in the data and its interpretation would probably be observed with the establishment of a

  2. Initiating Events Modeling for On-Line Risk Monitoring Application

    International Nuclear Information System (INIS)

    Simic, Z.; Mikulicic, V.

    1998-01-01

    In order to make on-line risk monitoring application of Probabilistic Risk Assessment more complete and realistic, a special attention need to be dedicated to initiating events modeling. Two different issues are of special importance: one is how to model initiating events frequency according to current plant configuration (equipment alignment and out of service status) and operating condition (weather and various activities), and the second is how to preserve dependencies between initiating events model and rest of PRA model. First, the paper will discuss how initiating events can be treated in on-line risk monitoring application. Second, practical example of initiating events modeling in EPRI's Equipment Out of Service on-line monitoring tool will be presented. Gains from application and possible improvements will be discussed in conclusion. (author)

  3. Process monitoring using a Quality and Technical Surveillance Program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a Quality and Technical Surveillance Program was to help ensure manufactured clad vents sets fully met technical and quality requirements established by the manufacturer and the customer, and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The Quality and Technical Surveillance Program provided a planned, scheduled approach to monitor key processes and documentation illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated

  4. Ontario hydro's aqueous discharge monitoring program

    International Nuclear Information System (INIS)

    Mehdi, S.H.; Booth, M.R.; Massey, R.; Herrmann, O.

    1992-01-01

    The Province of Ontario has legislated a comprehensive monitoring program for waterborne trace contaminants called MISA - Municipal Industrial Strategy for Abatement. The electric power sector regulation applies to all generating stations (Thermal, Nuclear, Hydraulic). The program commenced in June, 1990. The current phase of the regulation requires the operators of the plants to measure the detailed composition of the direct discharges to water for a one year period. Samples are to be taken from about 350 identified streams at frequencies varying from continuous and daily to quarterly. The data from this program will be used to determine the scope of the ongoing monitoring program and control. This paper discusses the preparation and planning, commissioning, training and early operations phase of the MISA program. In response, the central Analytical Laboratory and Environmental staff worked to develop a sampling and analytical approach which uses the plant laboratories, the central analytical laboratory and a variety of external laboratories. The approach considered analytical frequency, sample stability, presence of radioactivity, suitability of staff, laboratory qualifications, need for long term internal capabilities, availability of equipment, difficulty of analysis, relationship to other work and problems, capital and operating costs. The complexity of the sampling program required the development of a computer based schedule to ensure that all required samples were taken as required with phase shifts between major sampling events at different plants to prevent swamping the capability of the central or external laboratories. New equipment has been purchased and installed at each plant to collect 24 hour composite samples. Analytical equipment has been purchased for each plant for analysis of perishable analytes or of samples requiring daily or thrice weekly analysis. Training programs and surveys have been implemented to assure production of valid data

  5. Technical basis and evaluation criteria for an air sampling/monitoring program

    International Nuclear Information System (INIS)

    Gregory, D.C.; Bryan, W.L.; Falter, K.G.

    1993-01-01

    Air sampling and monitoring programs at DOE facilities need to be reviewed in light of revised requirements and guidance found in, for example, DOE Order 5480.6 (RadCon Manual). Accordingly, the Oak Ridge National Laboratory (ORNL) air monitoring program is being revised and placed on a sound technical basis. A draft technical basis document has been written to establish placement criteria for instruments and to guide the ''retrospective sampling or real-time monitoring'' decision. Facility evaluations are being used to document air sampling/monitoring needs, and instruments are being evaluated in light of these needs. The steps used to develop this program and the technical basis for instrument placement are described

  6. AFRRI TRIGA Reactor water quality monitoring program

    International Nuclear Information System (INIS)

    Moore, Mark; George, Robert; Spence, Harry; Nguyen, John

    1992-01-01

    AFRRI has started a water quality monitoring program to provide base line data for early detection of tank leaks. This program revealed problems with growth of algae and bacteria in the pool as a result of contamination with nitrogenous matter. Steps have been taken to reduce the nitrogen levels and to kill and remove algae and bacteria from the reactor pool. (author)

  7. Steam side corrosion-erosion monitoring and control improvements performed at the Kalinin NPP in the frame of the CEC Tacis'92 program

    International Nuclear Information System (INIS)

    1994-01-01

    The TACIS program (Technical Assistance to the Community of Independent States), funded by the CEC, is aimed at improving the reliability and safety of the VVER NPPs operation. The program consists of the following two phases: upgrading the on-line water chemistry monitoring and laboratory analytical equipment; implementation of generic studies to assess the corrosion risks in the steam side sensitive areas and to set-up the most appropriate strategy to monitor and to control the corrosion-erosion phenomena in the secondary side. 3 figs., 2 tabs

  8. Measurement and monitoring technologies are important SITE program component

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    An ongoing component of the Superfund Innovative Technologies Evaluation (SITE) Program, managed by the US EPA at its Hazardous Waste Engineering Research Laboratory in Cincinnati, is the development and demonstration of new and innovative measurement and monitoring technologies that will be applicable to Superfund site characterization. There are four important roles for monitoring and measurement technologies at Superfund sites: (1) to assess the extent of contamination at a site, (2) to supply data and information to determine impacts to human health and the environment, (3) to supply data to select the appropriate remedial action, and (4) to monitor the success or effectiveness of the selected remedy. The Environmental Monitoring Systems Laboratory in Las Vegas, Nevada (EMSL-LV) has been supporting the development of improved measurement and monitoring techniques in conjunction with the SITE Program with a focus on two areas: Immunoassay for toxic substances and fiber optic sensing for in-situ analysis at Superfund sites

  9. Migrants in transit: the importance of monitoring HIV risk among migrant flows at the Mexico-US border.

    Science.gov (United States)

    Martinez-Donate, Ana P; Hovell, Melbourne F; Rangel, Maria Gudelia; Zhang, Xiao; Sipan, Carol L; Magis-Rodriguez, Carlos; Gonzalez-Fagoaga, J Eduardo

    2015-03-01

    We conducted a probability-based survey of migrant flows traveling across the Mexico-US border, and we estimated HIV infection rates, risk behaviors, and contextual factors for migrants representing 5 distinct migration phases. Our results suggest that the influence of migration is not uniform across genders or risk factors. By considering the predeparture, transit, and interception phases of the migration process, our findings complement previous studies on HIV among Mexican migrants conducted at the destination and return phases. Monitoring HIV risk among this vulnerable transnational population is critical for better understanding patterns of risk at different points of the migration process and for informing the development of protection policies and programs.

  10. The Stockpile Monitor Program

    International Nuclear Information System (INIS)

    Buntain, G.A.; Fletcher, M.; Rabie, R.

    1994-07-01

    Recent political changes have led to drastic reductions in the number of nuclear warheads in stockpile, as well as increased expectations for warhead-service lives. In order to support and maintain a shrinking and aging nuclear stockpile, weapon scientists and engineers need detailed information describing the environments experienced by weapons in the field. Hence, the Stockpile Monitor Program was initiated in 1991 to develop a comprehensive and accurate database of temperature and humidity conditions experienced by nuclear warheads both in storage and on-alert

  11. Indicators for monitoring screening programs with primary HPV test.

    Science.gov (United States)

    Zorzi, Manuel; Giorgi Rossi, Paolo

    2017-01-01

    following scientific evidence produced in numerous studies, as well as national and international guidelines, organized cervical cancer screening programs in Italy have gradually introduced the HPV test as primary screening test, replacing cytology. As public health interventions, screening programs must ensure equity, improvement in quality of life, and adequate information for the population involved with regards to benefits and possible risks; therefore, it is essential for quality to be constantly checked at every phase of the project.The Italian Cervical Screening Group (Gruppo Italiano per lo Screening Cervicale, GISCi) has written a handbook for the calculation and interpretation of cervical screening program monitoring indicators that take into account the new protocol based on primary HPV test with cytology triage. based on the European guidelines and Italian recommendations on primary HPVbased screening, the working group, which includes professionals from all the fields involved in cervical screening, identified the essential points needed to monitor the screening process, the accuracy of individual tests, and early outcomes, defining a specific indicator for each aspect. The indicators were grouped as follows: baseline indicators, indicators for test repeat after one year, cumulative indicators, and waiting times. For every indicator, the source of data, calculation formula, any standards or critical thresholds, and interpretation were defined. The standards are based on the results of NTCC trials or Italian pilot studies. the main indicators proposed for the organization are the following: number of invitations, compliance with first invitation, with one-year test repeat and with colposcopy; for test and process accuracy, a cohort approach was utilised, where indicators are based on women who must be followed for at least one year, so as to integrate the results obtained after the first HPV test with the outcome of the test's repetition after one year

  12. Revision of Viable Environmental Monitoring in a Development Pilot Plant Based on Quality Risk Assessment: A Case Study.

    Science.gov (United States)

    Ziegler, Ildikó; Borbély-Jakab, Judit; Sugó, Lilla; Kovács, Réka J

    2017-01-01

    In this case study, the principles of quality risk management were applied to review sampling points and monitoring frequencies in the hormonal tableting unit of a formulation development pilot plant. In the cleanroom area, premises of different functions are located. Therefore a general method was established for risk evaluation based on the Hazard Analysis and Critical Control Points (HACCP) method to evaluate these premises (i.e., production area itself and ancillary clean areas) from the point of view of microbial load and state in order to observe whether the existing monitoring program met the emerged advanced monitoring practice. LAY ABSTRACT: In pharmaceutical production, cleanrooms are needed for the manufacturing of final dosage forms of drugs-intended for human or veterinary use-in order to protect the patient's weakened body from further infections. Cleanrooms are premises with a controlled level of contamination that is specified by the number of particles per cubic meter at a specified particle size or number of microorganisms (i.e. microbial count) per surface area. To ensure a low microbial count over time, microorganisms are detected and counted by environmental monitoring methods regularly. It is reasonable to find the easily infected places by risk analysis to make sure the obtained results really represent the state of the whole room. This paper presents a risk analysis method for the optimization of environmental monitoring and verification of the suitability of the method. © PDA, Inc. 2017.

  13. Cylinder monitoring program

    Energy Technology Data Exchange (ETDEWEB)

    Alderson, J.H. [Martin Marietta Energy Systems, Inc., Paducah, KY (United States)

    1991-12-31

    Cylinders containing depleted uranium hexafluoride (UF{sub 6}) in storage at the Department of Energy (DOE) gaseous diffusion plants, managed by Martin Marietta Energy Systems, Inc., are being evaluated to determine their expected storage life. Cylinders evaluated recently have been in storage service for 30 to 40 years. In the present environment, the remaining life for these storage cylinders is estimated to be 30 years or greater. The group of cylinders involved in recent tests will continue to be monitored on a periodic basis, and other storage cylinders will be observed as on a statistical sample population. The program has been extended to all types of large capacity UF{sub 6} cylinders.

  14. Northeast Regional Cancer Institute's Cancer Surveillance and Risk Factor Program

    Energy Technology Data Exchange (ETDEWEB)

    Lesko, Samuel M.

    2007-07-31

    OBJECTIVES The Northeast Regional Cancer Institute is conducting a program of ongoing epidemiologic research to address cancer disparities in northeast Pennsylvania. Of particular concern are disparities in the incidence of, stage at diagnosis, and mortality from colorectal cancer. In northeast Pennsylvania, age-adjusted incidence and mortality rates for colorectal cancer are higher, and a significantly smaller proportion of new colorectal cancer cases are diagnosed with local stage disease than is observed in comparable national data. Further, estimates of the prevalence of colorectal cancer screening in northeast Pennsylvania are lower than the US average. The Northeast Regional Cancer Institute’s research program supports surveillance of common cancers, investigations of cancer risk factors and screening behaviors, and the development of resources to further cancer research in this community. This project has the following specific objectives: I. To conduct cancer surveillance in northeast Pennsylvania. a. To monitor incidence and mortality for all common cancers, and colorectal cancer, in particular, and b. To document changes in the stage at diagnosis of colorectal cancer in this high-risk, underserved community. II. To conduct a population-based study of cancer risk factors and screening behavior in a six county region of northeast Pennsylvania. a. To monitor and document changes in colorectal cancer screening rates, and b. To document the prevalence of cancer risk factors (especially factors that increase the risk of colorectal cancer) and to identify those risk factors that are unusually common in this community. APPROACH Cancer surveillance was conducted using data from the Northeast Regional Cancer Institute’s population-based Regional Cancer Registry, the Pennsylvania Cancer Registry, and NCI’s SEER program. For common cancers, incidence and mortality were examined by county within the region and compared to data for similar populations in the US

  15. The Savannah River Site's groundwater monitoring program

    International Nuclear Information System (INIS)

    1991-01-01

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents

  16. 10 CFR 600.341 - Monitoring and reporting program and financial performance.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Monitoring and reporting program and financial performance. 600.341 Section 600.341 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL... Organizations Post-Award Requirements § 600.341 Monitoring and reporting program and financial performance. (a...

  17. Yucca Mountain Biological Resources Monitoring Program; Annual report, FY91

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-01-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a possible site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a repository. To ensure that site characterization activities (SCA) do not adversely affect the Yucca Mountain area, an environmental program has been implemented to monitor and mitigate potential impacts and to ensure that activities comply with applicable environmental regulations. This report describes the activities and accomplishments during fiscal year 1991 (FY91) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Activities Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support.

  18. A Dynamic Programming Model for Optimizing Frequency of Time-Lapse Seismic Monitoring in Geological CO2 Storage

    Science.gov (United States)

    Bhattacharjya, D.; Mukerji, T.; Mascarenhas, O.; Weyant, J.

    2005-12-01

    Designing a cost-effective and reliable monitoring program is crucial to the success of any geological CO2 storage project. Effective design entails determining both, the optimal measurement modality, as well as the frequency of monitoring the site. Time-lapse seismic provides the best spatial coverage and resolution for reservoir monitoring. Initial results from Sleipner (Norway) have demonstrated effective monitoring of CO2 plume movement. However, time-lapse seismic is an expensive monitoring technique especially over the long term life of a storage project and should be used judiciously. We present a mathematical model based on dynamic programming that can be used to estimate site-specific optimal frequency of time-lapse surveys. The dynamics of the CO2 sequestration process are simplified and modeled as a four state Markov process with transition probabilities. The states are M: injected CO2 safely migrating within the target zone; L: leakage from the target zone to the adjacent geosphere; R: safe migration after recovery from leakage state; and S: seepage from geosphere to the biosphere. The states are observed only when a monitoring survey is performed. We assume that the system may go to state S only from state L. We also assume that once observed to be in state L, remedial measures are always taken to bring it back to state R. Remediation benefits are captured by calculating the expected penalty if CO2 seeped into the biosphere. There is a trade-off between the conflicting objectives of minimum discounted costs of performing the next time-lapse survey and minimum risk of seepage and its associated costly consequences. A survey performed earlier would spot the leakage earlier. Remediation methods would have been utilized earlier, resulting in savings in costs attributed to excessive seepage. On the other hand, there are also costs for the survey and remedial measures. The problem is solved numerically using Bellman's optimality principal of dynamic

  19. Management of bank risks in the system of internal financial monitoring

    Directory of Open Access Journals (Sweden)

    O.V. Lysenok

    2015-09-01

    Full Text Available Risk is an integral part of banking activities. That is why there are many researches on definition, measurement and monitoring of banking risks. Nowadays it is important to improve the risk management process of legalization (laundering of proceeds from crime or terrorist financing, especially in the present conditions of socio-economic development. This will improve the quality of financial monitoring in the country as a whole and will reduce the risk of attracting banks to laundering money from crime. The article reviews and examines modern management techniques and risk assessment of laundering proceeds from crime. The authors make suggestions to strengthen the tracking and detection of illegal schemes and appropriate approaches to «launder» criminal money. They also offer an appropriate model to manage the risks which accompany the process of laundering the proceeds from crime. According to the study carried out the authors provide their conclusions and recommendations to improve risk management in the system of internal financial monitoring of banks.

  20. Computer-aided performance monitoring program at Diablo Canyon

    International Nuclear Information System (INIS)

    Nelson, T.; Glynn, R. III; Kessler, T.C.

    1992-01-01

    This paper describes the thermal performance monitoring program at Pacific Gas ampersand Electric Company's (PG ampersand E's) Diablo Canyon Nuclear Power Plant. The plant performance monitoring program at Diablo Canyon uses the THERMAC performance monitoring and analysis computer software provided by Expert-EASE Systems. THERMAC is used to collect performance data from the plant process computers, condition that data to adjust for measurement errors and missing data points, evaluate cycle and component-level performance, archive the data for trend analysis and generate performance reports. The current status of the program is that, after a fair amount of open-quotes tuningclose quotes of the basic open-quotes thermal kitclose quotes models provided with the initial THERMAC installation, we have successfully baselined both units to cycle isolation test data from previous reload cycles. Over the course of the past few months, we have accumulated enough data to generate meaningful performance trends and, as a result, have been able to use THERMAC to track a condenser fouling problem that was costing enough megawatts to attract corporate-level attention. Trends from THERMAC clearly related the megawatt loss to a steadily degrading condenser cleanliness factor and verified the subsequent gain in megawatts after the condenser was cleaned. In the future, we expect to rebaseline THERMAC to a beginning of cycle (BOC) data set and to use the program to help track feedwater nozzle fouling

  1. Program of long term immunological monitoring of population groups exposed to risk factors due to Chernobyl accident

    International Nuclear Information System (INIS)

    Petrov, R.V.; Oradovskaya, I.V.; Pinegin, B.V.

    1991-01-01

    Program for long-term monitoring of health and immune status of people exposed to ionizing radiation during efforts to to eliminate effects of Chernobyl accident and those subjected to radiation factor effect linked with their living within the contanimated territories is considered. Program purpose consists in investigation into non-stochastic and stochastic immunological effects resulting from radiation factor effect under extreme conditions and under prolonged effect of low doses; in acquisition of new data on immune system state during early after the accident and delayed periods in people which took part in recovery efforts during the accident effect elimination and those who live within the controlled territories. Program is directed to early diagnostics of immune-depented pathologic states and other disfunctions of immunity during prenosologic period, and to development and conduction of combined preventive and treatment-and-sanitary measures using immunomodulation

  2. Monitoring instrumentation spent fuel management program. Final report

    International Nuclear Information System (INIS)

    1979-01-01

    Preliminary monitoring system methodologies are identified as an input to the risk assessment of spent fuel management. Conceptual approaches to instrumentation for surveillance of canister position and orientation, vault deformation, spent fuel dissolution, temperature, and health physics conditions are presented. In future studies, the resolution, reliability, and uncertainty associated with these monitoring system methodologies will be evaluated

  3. Credit Monitoring – a Core of Credit Risk Management: Theory and Experience

    Directory of Open Access Journals (Sweden)

    Daiva Jurevičienė

    2013-11-01

    Full Text Available Purpose of the article: Purpose of the article is to identify credit monitoring as a keystone of credit risk management in banks. CRM is widely discussed in scientific literature and in reports of institutions undertaking credit risk or supervisory bodies. However majority of such investigations are based on implementation of numerous quantitative or qualitative methods used for credit risk assessment before granting a loan or for credit portfolio risk management. There is a lack of information or investigations made on estimation of the need of credit monitoring in credit risk management process. Scientific aim: Scientific aim is to structure the early warning signs that reflect the condition of credits. Methodology/methods: The paper is based on analysis and resumption of various scientific and professional articles related to organization of credit process in banks. It combines results of assessments of credit monitoring importance in credit risk management process made by theoretical studies as well as investigation of experts. Findings: Finding of the article is presentation of credit monitoring tools that should be applied for corporate (and individual clients via modification of original credit agreement. Conclusions: (limits, implications etc Conclusion of the article is that credit monitoring is a keystone in credit risk management process. The purpose of credit monitoring is to detect in time possible worsening of the loan and to react (make changes in loan agreement. The simplest tool for credit monitoring is to identify early warning signs in time that could be assorted into four groups: EWS of business environment; EWS with regard to management, EWS regarding collateral, EWS in financial analysis. Limitation of investigation is impossibility of evaluation of importance of monitoring process in practice except investigation of experts (employees directly responsible for credit business.

  4. Yucca Mountain biological resources monitoring program; Annual report FY92

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-02-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a potential site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a potential repository. To ensure that site characterization activities (SCA) do not adversely affect the environment at Yucca Mountain, an environmental program has been implemented to monitor and mitigate potential impacts and ensure activities comply with applicable environmental regulations. This report describes the activities and accomplishments of EG&G Energy Measurements, Inc. (EG&G/EM) during fiscal year 1992 (FY92) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support.

  5. Graphic overview system for DOE's effluent and environmental monitoring programs

    International Nuclear Information System (INIS)

    Burson, Z.G.; Elle, D.R.

    1980-03-01

    The Graphic Overview System is a compilation of photos, maps, overlays, and summary information of environmental programs and related data for each DOE site. The information consists of liquid and airborne effluent release points, on-site storage locations, monitoring locations, aerial survey results, population distributions, wind roses, and other related information. The relationships of different environmental programs are visualized through the use of colored overlays. Trends in monitoring data, effluent releases, and on-site storage data are also provided as a corollary to the graphic display of monitoring and release points. The results provide a working tool with which DOE management (headquarters and field offices) can place in proper perspective key aspects of all environmental programs and related data, and the resulting public impact of each DOE site

  6. The Westinghouse Hanford Company Operational Environmental Monitoring Program CY-93

    International Nuclear Information System (INIS)

    Schmidt, J.W.

    1993-10-01

    The Operational Environmental Monitoring Program (OEMP) provides facility-specific environmental monitoring to protect the environment adjacent to facilities under the responsibility of Westinghouse Hanford Company (WHC) and assure compliance with WHC requirements and local, state, and federal environmental regulations. The objectives of the OEMP are to evaluate: compliance with federal (DOE, EPA), state, and internal WHC environmental radiation protection requirements and guides; performance of radioactive waste confinement systems; and trends of radioactive materials in the environment at and adjacent to nuclear facilities and waste disposal sites. This paper identifies the monitoring responsibilities and current program status for each area of responsibility

  7. Programs at risk

    Science.gov (United States)

    Jones, , R.

    Declaring that “these lists represent the smoke behind which a fire may be raging,” Senator John Glenn (D.-Ohio), chairman of the Senate Government Affairs committee, has released a list prepared by the Office of Management and Budget of 73 government programs “in which hundreds of billions of federal dollars are at risk.”The National Aeronautics and Space Administration and Department of Energy are among the 16 federal departments and agencies having programs that Glenn feels could be “our next HUDs.” The secret list is not of programs where losses have occurred, but only where safeguards are thought to be insufficient.

  8. Emergent Toxins in North Atlantic Temperate Waters: A Challenge for Monitoring Programs and Legislation

    Directory of Open Access Journals (Sweden)

    Marisa Silva

    2015-03-01

    Full Text Available Harmful Algal Blooms (HAB are complex to manage due to their intermittent nature and their severe impact on the economy and human health. The conditions which promote HAB have not yet been fully explained, though climate change and anthropogenic intervention are pointed as significant factors. The rise of water temperature, the opening of new sea canals and the introduction of ship ballast waters all contribute to the dispersion and establishment of toxin-producing invasive species that promote the settling of emergent toxins in the food-chain. Tetrodotoxin, ciguatoxin, palytoxin and cyclic imines are commonly reported in warm waters but have also caused poisoning incidents in temperate zones. There is evidence that monitoring for these toxins exclusively in bivalves is simplistic and underestimates the risk to public health, since new vectors have been reported for these toxins and as well for regulated toxins such as PSTs and DSTs. In order to avoid public health impacts, there is a need for adequate monitoring programs, a need for establishing appropriate legislation, and a need for optimizing effective methods of analysis. In this review, we will compile evidence concerning emergent marine toxins and provide data that may indicate the need to restructure the current monitoring programs of HAB.

  9. Emergent Toxins in North Atlantic Temperate Waters: A Challenge for Monitoring Programs and Legislation

    Science.gov (United States)

    Silva, Marisa; Pratheepa, Vijaya K.; Botana, Luis M.; Vasconcelos, Vitor

    2015-01-01

    Harmful Algal Blooms (HAB) are complex to manage due to their intermittent nature and their severe impact on the economy and human health. The conditions which promote HAB have not yet been fully explained, though climate change and anthropogenic intervention are pointed as significant factors. The rise of water temperature, the opening of new sea canals and the introduction of ship ballast waters all contribute to the dispersion and establishment of toxin-producing invasive species that promote the settling of emergent toxins in the food-chain. Tetrodotoxin, ciguatoxin, palytoxin and cyclic imines are commonly reported in warm waters but have also caused poisoning incidents in temperate zones. There is evidence that monitoring for these toxins exclusively in bivalves is simplistic and underestimates the risk to public health, since new vectors have been reported for these toxins and as well for regulated toxins such as PSTs and DSTs. In order to avoid public health impacts, there is a need for adequate monitoring programs, a need for establishing appropriate legislation, and a need for optimizing effective methods of analysis. In this review, we will compile evidence concerning emergent marine toxins and provide data that may indicate the need to restructure the current monitoring programs of HAB. PMID:25785464

  10. Integration of structural health monitoring solutions onto commercial aircraft via the Federal Aviation Administration structural health monitoring research program

    Science.gov (United States)

    Swindell, Paul; Doyle, Jon; Roach, Dennis

    2017-02-01

    The Federal Aviation Administration (FAA) started a research program in structural health monitoring (SHM) in 2011. The program's goal was to understand the technical gaps of implementing SHM on commercial aircraft and the potential effects on FAA regulations and guidance. The program evolved into a demonstration program consisting of a team from Sandia National Labs Airworthiness Assurance NDI Center (AANC), the Boeing Corporation, Delta Air Lines, Structural Monitoring Systems (SMS), Anodyne Electronics Manufacturing Corp (AEM) and the FAA. This paper will discuss the program from the selection of the inspection problem, the SHM system (Comparative Vacuum Monitoring-CVM) that was selected as the inspection solution and the testing completed to provide sufficient data to gain the first approved use of an SHM system for routine maintenance on commercial US aircraft.

  11. Migrants in Transit: The Importance of Monitoring HIV Risk Among Migrant Flows at the Mexico–US Border

    Science.gov (United States)

    Martinez-Donate, Ana P.; Hovell, Melbourne F.; Rangel, Maria Gudelia; Zhang, Xiao; Sipan, Carol L.; Magis-Rodriguez, Carlos; Gonzalez-Fagoaga, J. Eduardo

    2015-01-01

    We conducted a probability-based survey of migrant flows traveling across the Mexico–US border, and we estimated HIV infection rates, risk behaviors, and contextual factors for migrants representing 5 distinct migration phases. Our results suggest that the influence of migration is not uniform across genders or risk factors. By considering the predeparture, transit, and interception phases of the migration process, our findings complement previous studies on HIV among Mexican migrants conducted at the destination and return phases. Monitoring HIV risk among this vulnerable transnational population is critical for better understanding patterns of risk at different points of the migration process and for informing the development of protection policies and programs. PMID:25602882

  12. Ontario Hydro's environmental monitoring program for HV [high voltage] transmission line projects

    International Nuclear Information System (INIS)

    Braekevelt, P.N.

    1991-01-01

    Responsible monitoring and control of environmental impacts is key to obtaining future needed approvals for new high voltage (HV) transmission line projects. Ontario Hydro's environmental monitoring program was developed as a highly structured, self-imposed monitoring system to relieve government agencies of the responsibility of developing a similar external program. The goal was to be self-policing. The historical development, program structure, standards, priority ratings, documentation, communication and computerization of the program is described. The most effective way to minimize environmental impacts is to avoid sensitive features at the route selection stage, well before any construction takes place. The environmental monitoring program is based on the following blueprint: each crew member is responsible for environmental protection; environmental problems are to be resolved at the lowest level possible; potential concerns should be resolved before they become problems; known problems should be dealt with quickly to minimize impacts; team members should work cooperatively; and formal and regular communication is emphasized

  13. 32 CFR 34.41 - Monitoring and reporting program and financial performance.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Monitoring and reporting program and financial performance. 34.41 Section 34.41 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD... ORGANIZATIONS Post-award Requirements Reports and Records § 34.41 Monitoring and reporting program and financial...

  14. The Savannah River Site's Groundwater Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-03

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results.

  15. Online application of a risk management system for risk assessment and monitoring at NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun, E-mail: youngjun51@hotmail.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Yang, Ming, E-mail: yangming@hrbeu.edu.cn [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Wang, Wenlin, E-mail: wlwang0618@126.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Li, Fengjun, E-mail: leefengjun@163.com [China Nuclear Power Engineering Co. Ltd (China)

    2016-08-15

    Highlights: • A generic GO-FLOW modeling structure is proposed for easily Living PSA development and analysis. • Hierarchical and modularized scheme is applied in the development of Living PSA models and database. • A risk management system is developed by GO-FLOW method. • Functional testing is conducted on the risk management system for performance evaluation. • The fast solution time derived from Living PSA application is supportive in plant safety management. - Abstract: The paper presents a risk management system on the basis of Living PSA models which are developed under a proposed generic GO-FLOW modeling method with a hierarchical and modular structure. The design of the risk management system is aiming at assisting plant personnel to manage maintenance plan and system configuration, and conduct system reliability monitoring, risk monitoring and risk management quickly and conveniently through graphical user interfaces without going deep into the details of building, updating and analyzing reliability and risk models. The performance of the proposed risk management system was tested on a full-scale simulator of PWR nuclear power plant and demonstrated that the fast solution time derived from utilization of hierarchical and modularized Living PSA models is strongly supportive for instantaneous risk assessment as well as for daily risk management at NPPs.

  16. Establishing monitoring programs for travel time reliability.

    Science.gov (United States)

    2014-01-01

    Within the second Strategic Highway Research Program (SHRP 2), Project L02 focused on creating a suite of methods by which transportation agencies could monitor and evaluate travel time reliability. Creation of the methods also produced an improved u...

  17. Active sites environmental monitoring program FY 1997 annual report

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Marshall, D.S.; Cunningham, G.R.

    1998-03-01

    This report summarizes the activities conducted by the Active Sites Environmental Monitoring Program (ASEMP) from October 1996 through September 1997. The purpose of the program is to provide early detection and performance monitoring at active low-level waste (LLW) disposal sites in Solid Waste Storage Area (SWSA) 6 and transuranic (TRU) waste storage sites in SWSA 5 North. This report continues a series of annual and semiannual reports that present the results of ASEMP monitoring activities. This report details monitoring results for fiscal year (FY) 1997 from SWSA 6, including the Interim Waste Management Facility (IWMF) and the Hillcut Disposal Test Facility (HDTF), and (2) TRU-waste storage areas in SWSA 5 N. This report presents a summary of the methodology used to gather data for each major area along with the FY 1997 results. Figures referenced in the text are found in Appendix A and data tables are presented in Appendix B

  18. Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Brandt, C.C.; Cicerone, D.S. [and others

    1998-02-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  19. Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan

    International Nuclear Information System (INIS)

    Adams, S.M.; Brandt, C.C.; Cicerone, D.S.

    1998-02-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions

  20. The Community Environmental Monitoring Program in the 21st Century: The Evolution of a Monitoring Network

    International Nuclear Information System (INIS)

    Hartwell, W.T.; Tappen, J.; Karr, L.

    2007-01-01

    This paper focuses on the evolution of the various operational aspects of the Community Environmental Monitoring Program (CEMP) network following the transfer of program administration from the U.S. Environmental Protection Agency (EPA) to the Desert Research Institute (DRI) of the Nevada System of Higher Education in 1999-2000. The CEMP consists of a network of 29 fixed radiation and weather monitoring stations located in Nevada, Utah, and California. Its mission is to involve stakeholders directly in monitoring for airborne radiological releases to the off site environment as a result of past or ongoing activities on the Nevada Test Site (NTS) and to make data as transparent and accessible to the general public as feasible. At its inception in 1981, the CEMP was a cooperative project of the U.S. Department of Energy (DOE), DRI, and EPA. In 1999-2000, technical administration of the CEMP transitioned from EPA to DRI. Concurrent with and subsequent to this transition, station and program operations underwent significant enhancements that furthered the mission of the program. These enhancements included the addition of a full suite of meteorological instrumentation, state-of-the-art electronic data collectors, on-site displays, and communications hardware. A public website was developed. Finally, the DRI developed a mobile monitoring station that can be operated entirely on solar power in conjunction with a deep-cell battery, and includes all meteorological sensors and a pressurized ion chamber for detecting background gamma radiation. Final station configurations have resulted in the creation of a platform that is well suited for use as an in-field multi-environment test-bed for prototype environmental sensors and in interfacing with other scientific and educational programs. Recent and near-future collaborators have included federal, state, and local agencies in both the government and private sectors. The CEMP also serves as a model for other programs wishing to

  1. Evaluation of nuclear power plant environmental impact prediction, based on monitoring programs. Summary and recommendations

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Watson, D.G.

    1977-02-01

    An evaluation of the effectivenss of non-radiological environmental monitoring programs is presented. The monitoring programs for Monticello, Haddam Neck, and Millstone Nuclear Generating Plants are discussed. Recommendations for improvements in monitoring programs are presented

  2. Load monitoring program: Status and results report. Volume 1: Summary

    International Nuclear Information System (INIS)

    1994-06-01

    British Columbia Hydro conducts a monitoring program to provide information on customer needs and values for planning; to measure customer response, energy savings impacts, and load shape impacts due to changes in rate level, rate restructuring, and Power Smart programs; to estimate end-use consumption and load shapes by customer class; and to provide load information for distribution and system load studies. To achieve these objectives, the monitoring program tracks the characteristics and energy use patterns of a sample of BC Hydro residential, commercial, and industrial customers over a period of several years. The entire sample will be surveyed periodically to obtain information on changes in building characteristics, equipment stocks, and energy-use behavior and attitudes. A report is provided on the status of monitoring program activities and some results obtained in 1993/94. For the residential sector, the results include typical load profiles, end-user demographics, and extent of electric space heating and water heating. In the commercial sector, customers were divided into two main groups. The large-building group was relatively well organized in terms of energy needs and participated in Power Smart programs. The small-building group was relatively energy-inefficient and relatively unaware of Power Smart programs. 43 figs., 15 tabs

  3. A framework for evaluating and designing citizen science programs for natural resources monitoring.

    Science.gov (United States)

    Chase, Sarah K; Levine, Arielle

    2016-06-01

    We present a framework of resource characteristics critical to the design and assessment of citizen science programs that monitor natural resources. To develop the framework we reviewed 52 citizen science programs that monitored a wide range of resources and provided insights into what resource characteristics are most conducive to developing citizen science programs and how resource characteristics may constrain the use or growth of these programs. We focused on 4 types of resource characteristics: biophysical and geographical, management and monitoring, public awareness and knowledge, and social and cultural characteristics. We applied the framework to 2 programs, the Tucson (U.S.A.) Bird Count and the Maui (U.S.A.) Great Whale Count. We found that resource characteristics such as accessibility, diverse institutional involvement in resource management, and social or cultural importance of the resource affected program endurance and success. However, the relative influence of each characteristic was in turn affected by goals of the citizen science programs. Although the goals of public engagement and education sometimes complimented the goal of collecting reliable data, in many cases trade-offs must be made between these 2 goals. Program goals and priorities ultimately dictate the design of citizen science programs, but for a program to endure and successfully meet its goals, program managers must consider the diverse ways that the nature of the resource being monitored influences public participation in monitoring. © 2016 Society for Conservation Biology.

  4. The Savannah River Site's groundwater monitoring program

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

  5. Process monitoring using a quality and technical surveillance program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a quality and technical surveillance program was to help ensure that manufactured clad went sets fully met technical and quality requirements established by the manufacturer and the customer and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The quality and technical surveillance program provided a planned, scheduled approach to monitor key processes and documentation and certification systems to prevent noncompliances or any manufacturing discrepancies. These surveillances illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated. copyright 1995 American Institute of Physics

  6. Citizen radiation monitoring program for the TMI area

    International Nuclear Information System (INIS)

    Baratta, A.J.; Gricar, B.G.; Jester, W.A.

    1981-07-01

    The purpose of the program was to develop a system for citizens to independently measure radiation levels in and around their communities. This report describes the process by which the Program was developed and operated. It also presents the methods used to select and train the citizens in making and interpreting the measurements. The test procedures used to select the equipment for the program are described as are the results of the testing. Finally, the actual monitoring results are discussed along with the citizens' reactions to the program

  7. Citizen radiation monitoring program for the TMI area

    Energy Technology Data Exchange (ETDEWEB)

    Baratta, A.J.; Gricar, B.G.; Jester, W.A.

    1981-07-01

    The purpose of the program was to develop a system for citizens to independently measure radiation levels in and around their communities. This report describes the process by which the Program was developed and operated. It also presents the methods used to select and train the citizens in making and interpreting the measurements. The test procedures used to select the equipment for the program are described as are the results of the testing. Finally, the actual monitoring results are discussed along with the citizens' reactions to the program.

  8. Evaluation of Monticello Nuclear Power Plant, Environmental Impact Prediction, based on monitoring programs

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Watson, D.G.

    1976-11-01

    This report evaluates quantitatively the nonradiological environmental monitoring programs at Monticello Nuclear Generating Plant. The general objective of the study is to assess the effectiveness of monitoring programs in the measurement of environmental impacts. Specific objectives include the following: (1) Assess the validity of environmental impact predictions made in the Environmental Statement by analysis of nonradiological monitoring data; (2) evaluate the general adequacy of environmental monitoring programs for detecting impacts and their responsiveness to Technical Specifications objectives; (3) assess the adequacy of preoperational monitoring programs in providing a sufficient data base for evaluating operational impacts; (4) identify possible impacts that were not predicted in the environmental statement and identify monitoring activities that need to be added, modified or deleted; and (5) assist in identifying environmental impacts, monitoring methods, and measurement problems that need additional research before quantitative predictions can be attempted. Preoperational as well as operational monitoring data were examined to test the usefulness of baseline information in evaluating impacts. This included an examination of the analytical methods used to measure ecological and physical parameters, and an assessment of sampling periodicity and sensitivity where appropriate data were available

  9. Introduction to:Forest health monitoring program

    Science.gov (United States)

    Mark J. Ambrose

    2009-01-01

    This annual technical report is a product of the Forest Health Monitoring (FHM) Program. The report provides information about a variety of issues relating to forest health at a national scale. FHM national reports have the dual focus of presenting analyses of the latest available data and showcasing innovative techniques for analyzing forest health data. The report is...

  10. Generating evidence on a risk-based monitoring approach in the academic setting – lessons learned

    Directory of Open Access Journals (Sweden)

    Belinda von Niederhäusern

    2017-02-01

    Full Text Available Abstract Background In spite of efforts to employ risk-based strategies to increase monitoring efficiency in the academic setting, empirical evidence on their effectiveness remains sparse. This mixed-methods study aimed to evaluate the risk-based on-site monitoring approach currently followed at our academic institution. Methods We selected all studies monitored by the Clinical Trial Unit (CTU according to Risk ADApted MONitoring (ADAMON at the University Hospital Basel, Switzerland, between 01.01.2012 and 31.12.2014. We extracted study characteristics and monitoring information from the CTU Enterprise Resource Management system and from monitoring reports of all selected studies. We summarized the data descriptively. Additionally, we conducted semi-structured interviews with the three current CTU monitors. Results During the observation period, a total of 214 monitoring visits were conducted in 43 studies resulting in 2961 documented monitoring findings. Our risk-based approach predominantly identified administrative (46.2% and patient right findings (49.1%. We identified observational study design, high ADAMON risk category, industry sponsorship, the presence of an electronic database, experienced site staff, and inclusion of vulnerable study population to be factors associated with lower numbers of findings. The monitors understand the positive aspects of a risk-based approach but fear missing systematic errors due to the low frequency of visits. Conclusions We show that the factors mostly increasing the risk for on-site monitoring findings are underrepresented in the current risk analysis scheme. Our risk-based on-site approach should further be complemented by centralized data checks, allowing monitors to transform their role towards partners for overall trial quality, and success.

  11. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2001-01-01

    The Nevada Risk Assessment/Management Program is part of a national effort by the U.S. Department of Energy (Grant DE-FG01-96EW56093) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the Nevada Risk Assessment/Management Program and presents a synopsis of the effort that began in 1995 and will officially conclude on April 30, 2000. (author)

  12. Sandia National Laboratories California Environmental Monitoring Program Annual Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2006-02-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Monitoring Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 Update program report describes the activities undertaken during the past year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/CA.

  13. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends.

  14. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    International Nuclear Information System (INIS)

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends

  15. Unocal Parachute Creek Shale Oil Program Environmental Monitoring Program. Annual report, October 1, 1990-December 31, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The report contains summaries of compliance and supplemental environmental and industrial hygiene and health surveillance monitoring conducted during the period; compliance permits, permit changes, and Notices of Violations discussions; statistical significance of Employee General Health information, medical histories, physical exams, pulmonary functions, clinical tests and demographics; independent audit reports; and a description of retorted shale disposal activities

  16. InSAR deformation monitoring of high risk landslides

    Science.gov (United States)

    Singhroy, V.; Li, J.

    2013-05-01

    During the past year there were at least twenty five media reports of landslides and seismic activities some fatal, occurring in various areas in Canada. These high risk geohazards sites requires high resolution monitoring both spatially and temporally for mitigation purposes, since they are near populated areas and energy, transportation and communication corridors. High resolution air photos, lidar and satellite images are quite common in areas where the landslides can be fatal. Radar interferometry (InSAR) techniques using images from several radar satellites are increasingly being used in slope stability assessment. This presentation provides examples of using high-resolution (1-3m) frequent revisits InSAR techniques from RADARSAT 2 and TerraSAR X to monitor several types of high-risk landslides affecting transportation and energy corridors and populated areas. We have analyses over 200 high resolution InSAR images over a three year period on geologically different landslides. The high-resolution InSAR images are effective in characterizing differential motion within these low velocity landslides. The low velocity landslides become high risk during the active wet spring periods. The wet soils are poor coherent targets and corner reflectors provide an effective means of InSAR monitoring the slope activities.

  17. Community Radiation Monitoring Program. Annual report, December 1, 1982-March 31, 1984

    International Nuclear Information System (INIS)

    Jones, M.A.; Cooper, E.N.

    1984-01-01

    The Community Radiation Monitoring Program is beginning its third year as part of the underground nuclear testing safety program developed by the US Department of Energy. The objectives of the program are: (1) to include local participation in the federal program to protect the health and safety of residents near the Nevada Test Site, (2) to augment the existing radiation monitoring network, and (3) to improve public understanding of the program by direct community involvement. The activities of program personnel from December 1, 1982 to March 31, 1984 are descussed and future efforts presented. 3 figures, 17 tables. (MF)

  18. OAK RIDGE Y-12 PLANT BIOLOGICAL MONITORING AND ABATEMENT PROGRAM (BMAP) PLAN

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, S.M.; BRANDT, C.C.; CHRISTENSEN, S.W.; CICERONE, D.S.; GREELEY, M.S.JR; HILL, W.R.; HUSTON, M.S.; KSZOS, L.A.; MCCARTHY, J.F.; PETERSON, M.J.; RYON, M.G.; SMITH, J.G.; SOUTHWORTH, G.R.; STEWART, A.J.

    1998-10-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  19. Review of biological monitoring programs at nuclear facilities

    International Nuclear Information System (INIS)

    Quintana, L.R.; Oakes, T.W.; Shank, K.E.

    Biological monitoring programs, as well as relevant radioecological research studies, are reviewed at specific Department of Energy facilities; the program at Oak Ridge National Laboratory is discussed in detail. The biological measurements that are being used for interpreting the impact of a facility on its surrounding environment and nearby population are given. Suggestions which could facilitate interlaboratory comparison studies are presented

  20. Evaluation of Millstone Nuclear Power Plant, Environmental Impact prediction, based on monitoring programs

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Watson, D.G.

    1977-02-01

    This report evaluates the nonradiological monitoring program at Millstone Nuclear Power Plant. Both operational as well as preoperational monitoring programs were analyzed to produce long-term (5 yr or longer) data sets, where possible. In order to determine the effectiveness of these monitoring programs, the appropriate data sets have to be analyzed by the appropriate statistical analysis. Thus, both open literature and current statistical analysis being developed at Pacific Northwest Laboratories (PNL) were employed in data analysis

  1. Evaluation of Millstone Nuclear Power Plant, Environmental Impact prediction, based on monitoring programs

    Energy Technology Data Exchange (ETDEWEB)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Watson, D.G.

    1977-02-01

    This report evaluates the nonradiological monitoring program at Millstone Nuclear Power Plant. Both operational as well as preoperational monitoring programs were analyzed to produce long-term (5 yr or longer) data sets, where possible. In order to determine the effectiveness of these monitoring programs, the appropriate data sets have to be analyzed by the appropriate statistical analysis. Thus, both open literature and current statistical analysis being developed at Pacific Northwest Laboratories (PNL) were employed in data analysis.

  2. The VLBA-BU-BLAZAR Multi-Wavelength Monitoring Program

    Directory of Open Access Journals (Sweden)

    Svetlana Jorstad

    2016-10-01

    Full Text Available We describe a multiwavelength program of monitoring of a sample of bright γ-ray blazars, which the Boston University (BU group has being carrying out since June 2007. The program includes monthly monitoring with the Very Long Baseline Array at 43 GHz, optical photometric and polarimetric observations, construction and analysis of UV and X-ray light curves obtained with the Rossi X-ray Timing Explorer (RXTE and Swift satellites, and construction and analysis of γ-ray light curves based on data provided by the Large Area Telescope of the Fermi Gamma-ray Space Telescope. We present general results about the kinematics of parsec-scale radio jets, as well as the connection between γ-ray outbursts and jet events.

  3. Integrated Monitoring and Modeling of Carbon Dioxide Leakage Risk Using Remote Sensing, Ground-Based Monitoring, Atmospheric Models and Risk-Indexing Tools

    Science.gov (United States)

    Burton, E. A.; Pickles, W. L.; Gouveia, F. J.; Bogen, K. T.; Rau, G. H.; Friedmann, J.

    2006-12-01

    Correct assessment of the potential for CO2 leakage to the atmosphere or near surface is key to managing the risk associated with CO2 storage. Catastrophic, point-source leaks, diffuse seepage, and low leakage rates all merit assessment. Smaller leaks may be early warnings of catastrophic failures, and may be sufficient to damage natural vegetation or crops. Small leaks also may lead to cumulative build-up of lethal levels of CO2 in enclosed spaces, such as basements, groundwater-well head spaces, and caverns. Working with our ZERT partners, we are integrating a variety of monitoring and modeling approaches to understand how to assess potential health, property and environmental risks across this spectrum of leakage types. Remote sensing offers a rapid technique to monitor large areas for adverse environmental effects. If it can be deployed prior to the onset of storage operations, remote sensing also can document baseline conditions against which future claims of environmental damage can be compared. LLNL has been using hyperspectral imaging to detect plant stress associated with CO2 gas leakage, and has begun investigating use of NASA's new satellite or airborne instrumentation that directly measures gas compositions in the atmosphere. While remote sensing techniques have been criticized as lacking the necessary resolution to address environmental problems, new instruments and data processing techniques are demonstrated to resolve environmental changes at the scale associated with gas-leakage scenarios. During the shallow low-flow- CO2 release field experiments planned by ZERT, for the first time, we will have the opportunity to ground- truth hyperspectral data by simultaneous measurement of changes in hyperspectral readings, soil and root zone microbiology, ambient air, soil and aquifer CO2 concentrations. When monitoring data appear to indicate a CO2 leakage event, risk assessment and mitigation of that event requires a robust and nearly real-time method for

  4. In Vivo Monitoring Program Manual, PNL-MA-574

    Energy Technology Data Exchange (ETDEWEB)

    Lynch, Timothy P.

    2010-07-01

    An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

  5. Effluent controls and environmental monitoring programs for uranium milling operations

    International Nuclear Information System (INIS)

    Maixner, R.D.

    1979-01-01

    Controls will reduce gaseous, particulate, and liquid discharges. Monitoring programs are used to determine effectiveness. The controls and programs discussed are used at Cotter Corporation's Canon City Mill in Colorado. 3 refs

  6. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-17

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  7. 40 CFR 52.2035 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... Stations (PAMS) Program. 52.2035 Section 52.2035 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) Pennsylvania § 52.2035 Photochemical Assessment Monitoring Stations (PAMS) Program. On September 23, 1994... (PAMS) Program as a state implementation plan (SIP) revision, as required by section 182(c)(1) of the...

  8. Program package for data preparation of RISK events

    International Nuclear Information System (INIS)

    Denes, E.; Wagner, I.; Nagy, J.

    1980-01-01

    A FORTRAN program package written for the CDC-6500 computer is presented. The SMHV program is designed to transform data obtained from events of RISK streamer chamber by means of measuring SAMET or PUOS devices to the HEVAS data tormat format needed by the geometrical reconstruction program. Such a transformation provides the standartization of measurement data procession inside the RISK collaboration and capability of the direct input into program of event geometrical reconstruction registered on a film of RISK streamer chamber

  9. The Program for Regional and International Shorebird Monitoring (PRISM)

    Science.gov (United States)

    Bart, J.; Andres, B.; Brown, S.; Donaldson, G.; Harrington, B.; Johnston, V.; Jones, S.; Morrison, R.I.G.; Skagen, S.K.

    2005-01-01

    This report describes the "Program for Regional and International Shorebird Monitoring" (PRISM). PRISM is being implemented by a Canada-United States Shorebird Monitoring and Assessment Committee formed in 2001 by the Canadian Shorebird Working Group and the U.S. Shorebird Council. PRISM provides a single blueprint for implementing the shorebird conservation plans recently completed in Canada and the United States. The goals of PRISM are to (1) estimate the size of breeding population of 74 shorebird taxa in North America; (2) describe the distribution, abundance, and habitat relationships for each of these taxa; (3) monitor trends in shorebird population size; (4) monitor shorebird numbers at stopover locations, and; (5) assist local managers in meeting their shorebird conservation goals. PRISM has four main components: arctic and boreal breeding surveys, temperate breeding surveys, temperate non-breeding surveys, and neotropical surveys. Progress on, and action items for, each major component are described. The more important major tasks for immediate action are carrying out the northern surveys, conducting regional analyses to design the program of migration counts, and evaluating aerial photographic surveys for migration and winter counts.

  10. Lake Roosevelt Fisheries Monitoring Program; 1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Janelle R.; Scholz, Allan T. (Eastern Washington University, Upper Columbia United Tribes Fisheries Research Center, Cheney, WA)

    1991-09-01

    As partial mitigation for the loss of anadromous salmon and steelhead incurred by construction of Grand Coulee Dam, the Northwest Power Planning Council directed Bonneville Power Administration (BPA) to construct two kokanee salmon (Oncorhynchus nerka) hatcheries on Lake Roosevelt (NPPC 1987 [Section 903 (g)(l)(C)]). The hatcheries are to produce 8 million kokanee salmon fry or 3.2 million adults for outplanting into Lake Roosevelt as well as 500,000 rainbow trout (Oncorhynchus mykiss) for the Lake Roosevelt net-pen programs. In section 903 (g)(l)(E), the Council also directed BPA to fund a monitoring program to evaluate the effectiveness of the kokanee hatcheries. The monitoring program included the following components: (1) conduction of a year-round creel census survey to determine angler pressure, catch rates and composition, growth and condition of fish caught by anglers, and economic value of the fishery. Comparisons will be made before and after hatcheries are on-line to determine hatchery effectiveness; (2) conduct an assessment of kokanee, rainbow trout, and walleye feeding habits, growth rates, and densities of their preferred prey at different locations in the reservoir and how reservoir operations affect population dynamics of preferred prey organisms. This information will be used to determine kokanee and rainbow trout stocking locations, stocking densities and stocking times; (3) conduct a mark-recapture study designed to assess effectiveness of various release times and locations for hatchery-raised kokanee and net-pen raised rainbow so fish-loss over Grand Coulee Dam will be minimized, homing to egg collection sites will be improved and angler harvest will be increased. The above measures were adopted by the Council based on a management plan developed by Upper Columbia United Tribes Fisheries Center, Spokane Indian Tribe, Colville Confederated Tribes, Washington Department of Wildlife, and the National Park Service. This plan examined the

  11. An Updated Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Ramuhalli, Pradeep [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hirt, Evelyn H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Coles, Garill A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bonebrake, Christopher A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ivans, William J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wootan, David W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, Mark R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-07-18

    Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment, as AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors and the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results on augmenting an initial methodology for enhanced risk monitors that integrate real-time information about equipment condition and POF into risk monitors. Methods to propagate uncertainty through the enhanced risk monitor are evaluated. Available data to quantify the level of uncertainty and the POF of key components are examined for their relevance, and a status update of this data evaluation is described. Finally, we describe potential targets for developing new risk metrics that may be useful for studying trade-offs for economic

  12. The Savannah River Site`s Groundwater Monitoring Program: First quarter 1993, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1993-08-01

    This report summarizes the Savannah River Site (SRS) Groundwater Monitoring Program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the first quarter of 1993. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

  13. Implementation of an occupational monitoring program at Hospital Universitario Clementino Fraga Filho da Universidade Federal do Rio de Janeiro

    International Nuclear Information System (INIS)

    Oliveira, Sergio R.; Azevedo, Ana C.P.; Koch, Hilton A.

    2001-01-01

    A program of occupational monitoring meets in implantation in the HUCFF, initially was made a survey to verify as this control was effected. One evidenced that only three Service made use of a control of individual dosimetry, being that one of the Service revealed more structured. After analyzing the conditions of the Hospital, it was verified existence of other areas that make use of ionizing masers and that they did not present a dosimetric control for the employees. The following step, was to evaluate the contract of rendering of services of dosimetry, where it was verified that the paid value for the monthly reading of the dosemeters was very high. During the implantation of the program, small conversation had been carried through the end to clarify the correct use and the inherent necessity of use of the equipment, risks to the work with masers and half for a radiological protection the insurance. From now on, they had had some cases of doses above of the allowed limit, proving the importance of this program. Currently, they are being carried through tests of monitoring of area to verify the conditions of work, the risks for the companions of the patients and the eventual incorrect procedures. (author)

  14. Possibilities of using the German Federal States' permanent soil monitoring program for the monitoring of potential effects of genetically modified organisms (GMO).

    Science.gov (United States)

    Toschki, Andreas; Jänsch, Stephan; Roß-Nickoll, Martina; Römbke, Jörg; Züghart, Wiebke

    2015-01-01

    In the Directive 2001/18/EC on the deliberate release of genetically modified organisms (GMO) into the environment, a monitoring of potential risks is prescribed after their deliberate release or placing on the market. Experience and data of already existing monitoring networks should be included. The present paper summarizes the major findings of a project funded by the Federal Agency for Nature Conservation (Nutzungsmöglichkeiten der Boden-Dauerbeobachtung der Länder für das Monitoring der Umweltwirkungen gentechnisch veränderter Pflanzen. BfN Skripten, Bonn-Bad Godesberg 369, 2014). The full report in german language can be accessed on http://www.bfn.de and is available as Additional file 1. The aim of the project was to check if it is possible to use the German permanent soil monitoring program (PSM) for the monitoring of GMO. Soil organism communities are highly diverse and relevant with respect to the sustainability of soil functions. They are exposed to GMO material directly by feeding or indirectly through food chain interactions. Other impacts are possible due to their close association to soil particles. The PSM program can be considered as representative with regard to different soil types and ecoregions in Germany, but not for all habitat types relevant for soil organisms. Nevertheless, it is suitable as a basic grid for monitoring the potential effects of GMO on soil invertebrates. PSM sites should be used to derive reference values, i.e. range of abundance and presence of different relevant species of soil organisms. Based on these references, it is possible to derive threshold values to define the limit of acceptable change or impact. Therefore, a minimum set of sites and minimum set of standardized methods are needed, i.e. characterization of each site, sampling of selected soil organism groups, adequate adaptation of methods for the purpose of monitoring of potential effects of GMO. Finally, and probably most demanding, it is needed to develop

  15. GEO activities towards improved Geophysical monitoring. A key input to Disaster Risk Reduction.

    Science.gov (United States)

    Achache, J.; Rum, G.

    2007-05-01

    GEO has been established in 2005 with the main objective to put in place a Global, Coordinated, Comprehensive and Sustained System of Observing Systems (GEOSS) to serve 9 Social Benefit Areas, among which Disaster Risk Reduction. The paper will first set up the reference GEO framework, through a brief description of GEOSS key features, architectural functions and capacity building, and then will recall the value of the Geophysical observations, coming both from in situ and remote (satellite) systems, and, even more important, of their integration. GEO activities related to Geophysical monitoring and the use of related observation to foster social benefits in the Disaster Risk Reduction area will then be shortly described, together with the on-going key actions, including specific examples on key scientific/technical and data sharing aspects associated to GEOSS implementation. Special attention will be devoted on how Capacity Building strategy and activities are addressed through GEOSS development, building on infrastructure and programs under consolidation within GEO framework, such as the GEOSS Information collection and dissemination systems under development (GEONETCast, GEO Web Portal, GEO Clearinghouse) and the UN programs such as SPIDER (SPace based Information for Disaster management and Emergency Response) and UNOSAT. The paper will provide recommendations on the way forward for the implementation of Disaster Risk Management provisions as an integral part of sustainable development, also with the objective of creating within GEO a supporting framework to UNDP and World Bank activities on Risk Identification and Assessment.

  16. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    International Nuclear Information System (INIS)

    Bechtel Nevada Ecological Services

    1998-01-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS

  17. Estuarine monitoring programs in the Albemarle Sound study area, North Carolina

    Science.gov (United States)

    Moorman, Michelle; Kolb, Katharine R.; Supak, Stacy

    2014-01-01

    Albemarle Sound was selected in 2012 as one of the two demonstration sites in the Nation to test and improve the design of the National Water Quality Monitoring Council’s National Monitoring Network (NMN) for U.S. Coastal Waters and their tributaries. The goal of the NMN for U.S. coastal waters and tributaries is to provide information about the health of our oceans and coastal ecosystems and inland influences on coastal waters for improved resource management. The NMN is an integrated, multidisciplinary, and multiorganizational program using multiple sources of data and information to augment current monitoring programs.

  18. 1982 environmental-monitoring program report for the West Valley Demonstration Project site

    International Nuclear Information System (INIS)

    1983-05-01

    This report is prepared and submitted in accordance with the requirements of DOE Order 5484.1 and presents environmental monitoring program data collected at the West Valley Demonstration Project (WVDP) site from February 26, 1982, through December 31, 1982. The WVDP objective is to solidify approximately 600,000 gallons of high-level liquid radioactive waste stored at the former Nuclear Fuel Services reprocessing facility at West Valley, New York. Nuclear Fuel Services conducted an environmental monitoring program in accordance with Nuclear Regulatory Commission requirements which were appropriate for shutdown maintenance operations conducted at the site. That program was embraced by West Valley Nuclear Services Company (WVNS) at the time of transition (February 26, 1982) and will be modified to provide a comprehensive monitoring program in preparation for waste solidification operations scheduled for startup in June 1988. As such, the data presented in this report is considered preoperational in nature in accordance with DOE Order 5484.1, Chapter III, Paragraph 1. The environmental monitoring program planned for the operating phase of the project will be fully implemented by fiscal year 1985 and will provide at least two years of preoperational data prior to startup

  19. Environmental monitoring and radiation protection programs of Novi Han radioactive waste repository

    International Nuclear Information System (INIS)

    Christoskova, M.; Kostova, M.; Sheherov, L.; Bekiarov, P.; Iovtchev, M.

    2000-01-01

    The system for monitoring and control as an important part of the safety management of the Novi Han Radioactive Waste Repository contains two independent programs: environmental monitoring of the site (controlled area), the restricted access area and the surveillance area (supervised area) of the repository and radiation protection program including personal dosimetric control and indoor dosimetric control of workplaces in the buildings of the repository. The main activities related to the programs implementation are presented

  20. Software system development of NPP plant DiD risk monitor. Basic design of software configuration

    International Nuclear Information System (INIS)

    Yoshikawa, Hidekazu; Nakagawa, Takashi

    2015-01-01

    A new risk monitor system is under development which can be applied not only to prevent severe accident in daily operation but also to serve as to mitigate the radiological hazard just after severe accident happens and long term management of post-severe accident consequences. The fundamental method for the new risk monitor system is first given on how to configure the Plant Defense in-Depth (DiD) Risk Monitor by object-oriented software system based on functional modeling approach. In this paper, software system for the plant DiD risk monitor is newly developed by object oriented method utilizing Unified Modeling Language (UML). Usage of the developed DiD risk monitor is also introduced by showing examples for LOCA case of AP1000. (author)

  1. Continuous, environmental radon monitoring program at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Liu, N.; Sorensen, C.D.; Tung, C.H.; Orchard, C.R.

    1995-01-01

    A continuous, environmental radon monitoring program has been established in support of the Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP). The monitoring program is to characterize the natural radon emissions at the YMP site, to understand the existing radon concentrations in the environmental background, and to assess and control the potential work exposure. Based upon a study of the monitoring results, this paper presents a preliminary understanding of the magnitudes, characteristics, and exposure levels of radon at the YMP site

  2. 1997 LMITCO Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, B.; Street, L.; Wilhelmsen, R.

    1998-09-01

    This report describes the calendar year 1997 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs and compares 1997 data with program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standard, and to ensure protection of human health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends indicating a loss of control or unplanned releases from facility operations. With the exception of one nitrogen sample in the disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond, compliance with permits and applicable regulations was achieved. Data collected by the Environmental Monitoring Program demonstrate that public health and the environment were protected.

  3. Fetal programming and eating disorder risk.

    Science.gov (United States)

    Jones, Candace; Pearce, Brad; Barrera, Ingrid; Mummert, Amanda

    2017-09-07

    Fetal programming describes the process by which environmental stimuli impact fetal development to influence disease development later in life. Our analysis summarizes evidence for the role of fetal programming in eating disorder etiology through review of studies demonstrating specific obstetric complications and later eating risk of anorexia or bulimia. Using Pubmed, we found thirteen studies investigating obstetric factors and eating disorder risk published between 1999 and 2016. We then discuss modifiable maternal risk factors, including nutrition and stress, that influence anorexia or bulimia risk of their offspring. Translation of these findings applies to preventative strategies by health organizations and physicians to provide optimal health for mothers and their children to prevent development of medical and psychiatric illnesses. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. USDA Forest Service goals and programs for monitoring neotropical migratory birds

    Science.gov (United States)

    Patricia Manley

    1993-01-01

    The USDA Forest Service (USFS) developed goals, objectives, and guidelines for monitoring neotropical migratory birds (NTMB) on National Forest System lands in response to the Neotropical Migratory Bird Conservation Program Partners in Flight. A USFS task group developed a hierarchical monitoring framework designed to define priorities for type of monitoring data....

  5. Risk-based decision making and risk management of European Union regional programs

    Directory of Open Access Journals (Sweden)

    Michalopoulos Evangelos

    2008-01-01

    Full Text Available This paper presents a generalized method for management decision making incorporating risk assessment techniques. The risk based decision making methodology is applied to European Union expenditure programs used to implement its regional policy, such as the community support framework, community initiatives, special initiatives and other European policies. An example is presented for the development of an audit (inspection program in the region of West Macedonia, Greece, during the implementation of the 3rd Community Structural Support Framework Operational Program. The generic nature of the method permits its use in the management of similar European regional programs in Greece and other European countries. It is also applicable to many other industries interested in applying risk-based management decisions to physical or process based systems. .

  6. Community Radiation Monitoring Program annual report, January 1, 1981-November 30, 1982

    International Nuclear Information System (INIS)

    Cooper, E.N.; Jones, M.A.

    1982-01-01

    The Community Radiation Monitoring Program was conceived in December 1980, and implemention began in early 1981 as a cooperative effort by the US Department of Energy (DOE), US Environmental Protection Agency (EPA), the Desert Research Institute (DRI), and the University of Utah (UU). Its primary purpose is to augment the existing DOE-sponsored environmental monitoring network surrounding the Nevada Test Site that was being operated by EPA. It was designed to assure the public, both individuals and local and state entities, that there is a deep concern for the health and safety of all who could possibly be affected by past, present, and future testing at the Nevada Test Site, and that all possible precautionary monitoring of airborne radiological hazards is being done. The objectives of the program are to (1) involve the local communities and state agencies in the continuing federal program to protect health and safety of residents near the Nevada Test Site, (2) enhance the visibility and credibility of the radiation monitoring network, and (3) improve public understanding of the program by direct community involvement

  7. BIOLOGICAL MONITORING PROGRAM FOR EAST FORK POPLAR CREEK

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, S.M.; ASHWOOD, T.L.; BEATY, T.W.; BRANDT, C.C.

    1997-10-24

    In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit a Biological Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y- 12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the complex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic integrity of EFPC. These tasks are (1) toxicity monitoring, (2) biological indicator studies, (3) bioaccumulation studies, and (4) ecological surveys of the periphyton, benthic macroinvertebrate, and fish communities.

  8. Biological monitoring program for East Fork Poplar Creek

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Ashwood, T.L.; Beaty, T.W.; Brandt, C.C.; Christensen, S.W.; Cicerone, D.S.; Greeley, M.S. Jr.; Hill, W.R.; Kszos, L.S.

    1997-04-18

    In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the complex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic integrity of EFPC. These tasks are (1) toxicity monitoring, (2) biological indicator studies, (3) bioaccumulation studies, and (4) ecological surveys of the periphyton, benthic macroinvertebrate, and fish communities.

  9. Advances in volcano monitoring and risk reduction in Latin America

    Science.gov (United States)

    McCausland, W. A.; White, R. A.; Lockhart, A. B.; Marso, J. N.; Assitance Program, V. D.; Volcano Observatories, L. A.

    2014-12-01

    We describe results of cooperative work that advanced volcanic monitoring and risk reduction. The USGS-USAID Volcano Disaster Assistance Program (VDAP) was initiated in 1986 after disastrous lahars during the 1985 eruption of Nevado del Ruiz dramatizedthe need to advance international capabilities in volcanic monitoring, eruption forecasting and hazard communication. For the past 28 years, VDAP has worked with our partners to improve observatories, strengthen monitoring networks, and train observatory personnel. We highlight a few of the many accomplishments by Latin American volcano observatories. Advances in monitoring, assessment and communication, and lessons learned from the lahars of the 1985 Nevado del Ruiz eruption and the 1994 Paez earthquake enabled the Servicio Geológico Colombiano to issue timely, life-saving warnings for 3 large syn-eruptive lahars at Nevado del Huila in 2007 and 2008. In Chile, the 2008 eruption of Chaitén prompted SERNAGEOMIN to complete a national volcanic vulnerability assessment that led to a major increase in volcano monitoring. Throughout Latin America improved seismic networks now telemeter data to observatories where the decades-long background rates and types of seismicity have been characterized at over 50 volcanoes. Standardization of the Earthworm data acquisition system has enabled data sharing across international boundaries, of paramount importance during both regional tectonic earthquakes and during volcanic crises when vulnerabilities cross international borders. Sharing of seismic forecasting methods led to the formation of the international organization of Latin American Volcano Seismologists (LAVAS). LAVAS courses and other VDAP training sessions have led to international sharing of methods to forecast eruptions through recognition of precursors and to reduce vulnerabilities from all volcano hazards (flows, falls, surges, gas) through hazard assessment, mapping and modeling. Satellite remote sensing data

  10. A pilot marine monitoring program in Cook Inlet, Alaska 1993--1994

    International Nuclear Information System (INIS)

    Brown, J.S.; Boehm, P.D.; Hyland, J.L.; Prest, H.F.

    1995-01-01

    Under the mandate of the Oil Pollution Act of 1990 (OPA'90) the Cook Inlet Regional Citizens Advisory Council (CIRCAC) sponsored the initiation of a pilot monitoring program in Cook Inlet, Alaska, The objectives of the pilot monitoring program were to provide baseline data on petroleum hydrocarbon concentrations in sediments and biota of Cook Inlet, and to evaluate the effectiveness of selected monitoring techniques in detecting petroleum hydrocarbon inputs from industry based sources. A sampling program was initiated in 1993 that included petroleum industry, specific sites and reference sites. Sample measurements included polynuclear aromatic hydrocarbons (PAH) in sediments, caged mussels, and semipermeable membrane devices (SPMDs), sediment toxicity using the amphipod, Ampelisca abdita, and estimates of population size and physiological condition of indigenous bivalves. Results of the 1993 sampling program indicated that (1) background levels of petrogenic, pyrogenic, and diagenetic hydrocarbons were present in sediments and indigenous bivalves, and (2) that limited amphipod toxicity and variations in bivalve measurements did not correlate with the hydrocarbons in the sediments. Modifications to the 1993 program were instituted for the 1994 sampling and included, the selection of new industry specific sites, discontinued use of caged bivalves, and design changes to SPMDs to enhance sensitivity. The results of the 1994 sampling program, and comparisons with the 1993 data are presented

  11. Recommendations for strengthening the infrared technology component of any condition monitoring program

    Science.gov (United States)

    Nicholas, Jack R., Jr.; Young, R. K.

    1999-03-01

    This presentation provides insights of a long term 'champion' of many condition monitoring technologies and a Level III infra red thermographer. The co-authors present recommendations based on their observations of infra red and other components of predictive, condition monitoring programs in manufacturing, utility and government defense and energy activities. As predictive maintenance service providers, trainers, informal observers and formal auditors of such programs, the co-authors provide a unique perspective that can be useful to practitioners, managers and customers of advanced programs. Each has over 30 years experience in the field of machinery operation, maintenance, and support the origins of which can be traced to and through the demanding requirements of the U.S. Navy nuclear submarine forces. They have over 10 years each of experience with programs in many different countries on 3 continents. Recommendations are provided on the following: (1) Leadership and Management Support (For survival); (2) Life Cycle View (For establishment of a firm and stable foundation for a program); (3) Training and Orientation (For thermographers as well as operators, managers and others); (4) Analyst Flexibility (To innovate, explore and develop their understanding of machinery condition); (5) Reports and Program Justification (For program visibility and continued expansion); (6) Commitment to Continuous Improvement of Capability and Productivity (Through application of updated hardware and software); (7) Mutual Support by Analysts (By those inside and outside of the immediate organization); (8) Use of Multiple Technologies and System Experts to Help Define Problems (Through the use of correlation analysis of data from up to 15 technologies. An example correlation analysis table for AC and DC motors is provided.); (9) Root Cause Analysis (Allows a shift from reactive to proactive stance for a program); (10) Master Equipment Identification and Technology Application (To

  12. Parachute Creek Shale Oil Program Environmental Monitoring Program. Quarterly report, fourth quarter, October 1-December 31, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The document contains environmental compliance data collected in the fourth quarter of 1991, contents of reports on compliance data submitted to regulatory agencies, and supplemental analytical results from retorted shale pile runoff water collected following a storm event during the third quarter of 1991

  13. 1998 Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    L. V. Street

    1999-09-01

    This report describes the calendar year 1998 compliance monitoring and environmental surveillance activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1998 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The INEEL complied with permits and applicable regulations, with the exception of nitrogen samples in a disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond. Data collected by the Environmental Monitoring Program demonstrate that the public health and environment were protected.

  14. Development of a risk monitoring system for nuclear power plants based on GO-FLOW methodology

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun, E-mail: youngjun51@hotmail.com [College of Nuclear Science and Technology, Harbin Engineering University, No. 145 Nantong Street, Nangang District, Harbin 150001 (China); Yang, Ming, E-mail: yangming@hrbeu.edu.cn [College of Nuclear Science and Technology, Harbin Engineering University, No. 145 Nantong Street, Nangang District, Harbin 150001 (China); Yoshikawa, Hidekazu, E-mail: yosikawa@kib.biglobe.ne.jp [Symbio Community Forum, Kyoto (Japan); Yang, Fangqing, E-mail: yfq613@163.com [China Nuclear Power Technology Research Institute, 518000 (China)

    2014-10-15

    Highlights: • A method for developing Living PSA is proposed. • Living PSA is easy to update with online modification to system model file. • A risk monitoring system is designed and developed using the GO-FLOW. • The risk monitoring system is useful for plant daily operation risk management. - Abstract: The paper presents a risk monitoring system developed based on GO-FLOW methodology which is a success-oriented system reliability modeling technique for phased mission as well as time-dependent problems analysis. The risk monitoring system is designed to receive information on plant configuration changes either from equipment failures, operator interventions, or maintenance activities, then update the Living PSA model with online modification to the system GO-FLOW model file which contains all the functional modes of equipment represented by a proposed generalized GO-FLOW modeling structure, and display risk values graphically. The risk monitoring system can be used to assist safety engineers and plant operators in their maintenance management and daily operation risk management at NPPs.

  15. Development of a risk monitoring system for nuclear power plants based on GO-FLOW methodology

    International Nuclear Information System (INIS)

    Yang, Jun; Yang, Ming; Yoshikawa, Hidekazu; Yang, Fangqing

    2014-01-01

    Highlights: • A method for developing Living PSA is proposed. • Living PSA is easy to update with online modification to system model file. • A risk monitoring system is designed and developed using the GO-FLOW. • The risk monitoring system is useful for plant daily operation risk management. - Abstract: The paper presents a risk monitoring system developed based on GO-FLOW methodology which is a success-oriented system reliability modeling technique for phased mission as well as time-dependent problems analysis. The risk monitoring system is designed to receive information on plant configuration changes either from equipment failures, operator interventions, or maintenance activities, then update the Living PSA model with online modification to the system GO-FLOW model file which contains all the functional modes of equipment represented by a proposed generalized GO-FLOW modeling structure, and display risk values graphically. The risk monitoring system can be used to assist safety engineers and plant operators in their maintenance management and daily operation risk management at NPPs

  16. Research, Monitoring, and Evaluation for the Federal Columbia River Estuary Program

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Ebberts, Blaine D.; Tortorici, Cathy; Yerxa, Tracey; Leary, J.; Skalski, John R.

    2008-02-05

    The purpose ofthis document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision-making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows. 1. Understand the primary stressors affecting ecosystem controlling factors, such as ocean conditions and invasive species. 2. Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. 3. Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. 4. Maintain the food web to benefit salmonid performance. 5. Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. In conclusion, the estuary RME effort is designed to meet the research and monitoring needs of the estuary Program using an adaptive management process. Estuary RME's success and usefulness will depend on the actual conduct of adaptive management, as embodied in the objectives, implrementation, data, reporting, and synthesis, evaluation, and decision-making described herein.

  17. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada Ecological Services

    1998-10-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS.

  18. Colon Cancer Risk Assessment - Gauss Program

    Science.gov (United States)

    An executable file (in GAUSS) that projects absolute colon cancer risk (with confidence intervals) according to NCI’s Colorectal Cancer Risk Assessment Tool (CCRAT) algorithm. GAUSS is not needed to run the program.

  19. The Savannah River Site`s Groundwater Monitoring Program. First quarter 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-03

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

  20. Environmental Monitoring and Assessment Program (EMAP) National Coastal Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Environmental Monitoring and Assessment Program (EMAP) National Coastal Database contains estuarine and coastal data that EMAP and Regional-EMAP have collected...

  1. The Savannah River site`s groundwater monitoring program: second quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-11-01

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1997, EPD/EMS conducted extensive sampling of monitoring wells. A detailed explanation of the flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1997 are included in this report.

  2. Core state preconception health indicators - pregnancy risk assessment monitoring system and behavioral risk factor surveillance system, 2009.

    Science.gov (United States)

    Robbins, Cheryl L; Zapata, Lauren B; Farr, Sherry L; Kroelinger, Charlan D; Morrow, Brian; Ahluwalia, Indu; D'Angelo, Denise V; Barradas, Danielle; Cox, Shanna; Goodman, David; Williams, Letitia; Grigorescu, Violanda; Barfield, Wanda D

    2014-04-25

    Promoting preconception health can potentially improve women's health and pregnancy outcomes. Evidence-based interventions exist to reduce many maternal behaviors and chronic conditions that are associated with adverse pregnancy outcomes such as tobacco use, alcohol use, inadequate folic acid intake, obesity, hypertension, and diabetes. The 2006 national recommendations to improve preconception health included monitoring improvements in preconception health by maximizing public health surveillance (CDC. Recommendations to improve preconception health and health care-United States: a report of the CDC/ATSDR Preconception Care Work Group and the Select Panel on Preconception Care. MMWR 2006;55[No. RR-6]). 2009 for 38 indicators; 2008 for one indicator. DESCRIPTION OF SURVEILLANCE SYSTEMS: The Pregnancy Risk Assessment Monitoring System (PRAMS) is an ongoing state- and population-based surveillance system designed to monitor selected self-reported maternal behaviors, conditions, and experiences that occur shortly before, during, and after pregnancy among women who deliver live-born infants. The Behavioral Risk Factor Surveillance System (BRFSS) is an ongoing state-based telephone survey of noninstitutionalized adults aged ≥18 years in the United States that collects state-level data on health-related risk behaviors, chronic conditions, and preventive health services. This surveillance summary includes PRAMS data from 29 reporting areas (n = 40,388 respondents) and BRFSS data from 51 reporting areas (n = 62,875 respondents) for nonpregnant women of reproductive age (aged 18-44 years). To establish a comprehensive, nationally recognized set of indicators to be used for monitoring, evaluation, and response, a volunteer group of policy and program leaders and epidemiologists identified 45 core state preconception health indicators, of which 41 rely on PRAMS or BRFSS as data sources. This report includes 39 of the 41 core state preconception health indicators for which

  3. A Study on the Estimation Method of Risk Based Area for Jetty Safety Monitoring

    Directory of Open Access Journals (Sweden)

    Byeong-Wook Nam

    2015-09-01

    Full Text Available Recently, the importance of safety-monitoring systems was highlighted by the unprecedented collision between a ship and a jetty in Yeosu. Accordingly, in this study, we introduce the concept of risk based area and develop a methodology for a jetty safety-monitoring system. By calculating the risk based areas for a ship and a jetty, the risk of collision was evaluated. To calculate the risk based areas, we employed an automatic identification system for the ship, stopping-distance equations, and the regulation velocity near the jetty. In this paper, we suggest a risk calculation method for jetty safety monitoring that can determine the collision probability in real time and predict collisions using the amount of overlap between the two calculated risk based areas. A test was conducted at a jetty control center at GS Caltex, and the effectiveness of the proposed risk calculation method was verified. The method is currently applied to the jetty-monitoring system at GS Caltex in Yeosu for the prevention of collisions.

  4. The Savannah River Site's Groundwater Monitoring Program, third quarter 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-17

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  5. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2000-01-01

    The Nevada Risk Assessment/Management Program (NRAMP) is part of a national effort by the U.S. Department of Energy (DOE) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the NRAMP project and presents a synopsis of the NRAMP effort which occurred from 1995 to 2000. The primary goals of the DOE in awarding the cooperative agreement establishing NRAMP were to (I) use a risk-based approach to evaluate the consequences of alternative actions in DOE's Environmental Remediation Programs at sites in Nevada and (2) use a neutral and credible institution outside the DOE to perform the risk assessments and contribute to public education about environmental management issues at the Nevada Test Site. (author)

  6. 12 CFR 27.6 - Substitute monitoring program.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Substitute monitoring program. 27.6 Section 27.6 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY FAIR HOUSING HOME LOAN... (12 CFR 202.13(d)). A bank collecting the data in compliance with § 27.3 of this part will be in...

  7. Introduction to: The Forest Health monitoring program

    Science.gov (United States)

    Barbara L. Conkling

    2011-01-01

    The National Forest Health Monitoring (FHM) Program of the Forest Service, U.S. Department of Agriculture, produces an annual technical report on forest health as one of its products. The report is organized using the Criteria and Indicators for the Conservation and Sustainable Management of Temperate and Boreal Forests (Montréal Process Working Group 2007) as a...

  8. Lessons from a Community-Based Program to Monitor Forest Vertebrates in the Brazilian Amazon

    Science.gov (United States)

    Benchimol, Maíra; von Mühlen, Eduardo M.; Venticinque, Eduardo M.

    2017-09-01

    A large number of sustainable use reserves recently have been titled in the Brazilian Amazonia. These reserves require public participation in the design and implementation of management and monitoring programs. Species-monitoring programs that engage local stakeholders may be useful for assessing wildlife status over the long term. We collaborated on the development of a participatory program to monitor forest vertebrates in the Piagaçu-Purus Sustainable Development Reserve and to build capacity among the local people. We examined relations between the distance to the nearest human community and sighting rates of each species, and evaluated the program overall. Eighteen wildlife monitors received training in line transect and sign surveys and then conducted surveys along a total of ten transects. Sighting rates of most species in the Piagaçu-Purus Sustainable Development Reserve were higher than those reported in other Amazonian forests. Distance to the human community was not associated with the overall vertebrate sighting rate. Use of the trained monitors was successful in terms of data acquisition and engagement. The involvement of local people promoted discussions about regulation of hunting in the reserve. Implementation of community-based programs to monitor forest wildlife in Amazonian sustainable use reserves may empower local communities and assess the status of wildlife through time.

  9. Guidance on the implementation of a risk based safety performance monitoring system for nuclear power plants

    International Nuclear Information System (INIS)

    Sewell, R.T.; Kuritzky, A.S.; Khatib-Rahbar, M.

    1997-05-01

    The principal objective of the present study is to review and evaluate existing Performance Indicator (PI) monitoring programs, and to develop and demonstrate an overall PSA-based methodology and framework for the monitoring and use of risk-based PIs and SIs (Safety Indicator), that would enable: Identification of trends and patterns in safety performance at a specific plant and a population of plants; Assessment of the significance of the trends and patterns; Identification of precursors of accident sequences and safety reductions; Identification of the most critical functional areas of concern, especially as they relate to a defense-in-depth safety philosophy; Comparison of safety performance trends at a plant with those at comparable plants; Incorporation of the PIs and SIs into a risk- and performance-based decision process. To support the overall project objective, it is important that information needs and data collection procedures are clearly outlined. Of key significance in this regard is the premise that a performance monitoring system should not be burdened by an excessive number of low-level PIs that may have only a peripheral relationship to safety. Other supporting objectives of the study include: To identify and discuss other issues pertaining to the practical implementation of a safety performance monitoring system (outlining the databases and algorithms needed); and to demonstrate implementation of the preliminary guidance for monitoring and use of the selected set of PIs and SIs, within the proposed framework, via application to the operating history of a NPP having a PSA and readily available event data

  10. A survey of an air monitoring program

    International Nuclear Information System (INIS)

    Lee, M.B.

    1997-01-01

    The objective of this report is to compare personal air sampling data to stationary air sampling data and to bioassay data that was taken during the decontamination and decommissioning of sixty-one plutonium glove boxes at Argonne National Laboratory (ANL) in 1995. An air monitoring program administered at Argonne National Laboratory was assessed by comparing personal air sampler (PAS) data, stationary air sampler (SAS) data, and bioassay data. The study revealed that the PAS and SAS techniques were equivalent when averaged over all employees and all workdays, but the standard deviation was large. Also, large deviations were observed in individual samples. The correlation between individual PAS results and bioassay results was low. Personal air samplers and bioassay monitoring played complementary roles in assessing the workplace and estimating intakes. The PAS technique is adequate for detection and evaluation of contaminated atmospheres, whereas bioassay monitoring is better for determining individual intakes

  11. The Savannah River Site`s groundwater monitoring program. First quarter 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results.

  12. 75 FR 45563 - Terrorism Risk Insurance Program; Final Netting

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF THE TREASURY 31 CFR Part 50 RIN 1505-AC24 Terrorism Risk Insurance Program; Final... Title I of the Terrorism Risk Insurance Act of 2002 (``TRIA'' or ``the Act''), as amended by the Terrorism Risk Insurance Extension Act of 2005 (``Extension Act'') and the Terrorism Risk Insurance Program...

  13. Real-time risk monitoring in business processes : a sensor-based approach

    NARCIS (Netherlands)

    Conforti, R.; La Rosa, M.; Fortino, G.; Hofstede, ter A.H.M.; Recker, J.; Adams, M.

    2013-01-01

    This article proposes an approach for real-time monitoring of risks in executable business process models. The approach considers risks in all phases of the business process management lifecycle, from process design, where risks are defined on top of process models, through to process diagnosis,

  14. Monitoring Java Programs with Java PathExplorer

    Science.gov (United States)

    Havelund, Klaus; Rosu, Grigore; Clancy, Daniel (Technical Monitor)

    2001-01-01

    We present recent work on the development Java PathExplorer (JPAX), a tool for monitoring the execution of Java programs. JPAX can be used during program testing to gain increased information about program executions, and can potentially furthermore be applied during operation to survey safety critical systems. The tool facilitates automated instrumentation of a program's late code which will then omit events to an observer during its execution. The observer checks the events against user provided high level requirement specifications, for example temporal logic formulae, and against lower level error detection procedures, for example concurrency related such as deadlock and data race algorithms. High level requirement specifications together with their underlying logics are defined in the Maude rewriting logic, and then can either be directly checked using the Maude rewriting engine, or be first translated to efficient data structures and then checked in Java.

  15. Health risk assessment for program managers

    International Nuclear Information System (INIS)

    Jump, R.A.; Williamson, D.S.

    1994-01-01

    This paper presents the findings of a sensitivity analysis into the independent variables that determine the levels of health risks posed by buried plutonium and americium at a typical contaminated site in an arid region. Environmental Restoration Program Managers often must make decisions concerning cleanup levels, remediation alternatives, schedules, cost estimates, etc. based upon extraordinarily safe assumptions about risk assessment calculation inputs. This study reveals to the Program Manager which variables are major drivers to the calculated levels of risk posed by transuranic radionuclides and which ones have second order effects or less. The findings of this study should indicate which inputs should be the focus of attention during negotiations with regulators and of further empirical investigation

  16. Long-Term Hydrologic Monitoring Program, Amchitka Island, Alaska

    International Nuclear Information System (INIS)

    1982-01-01

    The purpose of the Long-Term Hydrologic Monitoring Program for Amchitka Island, Alaska, is to obtain data that will assure the public safety, inform the public, the news media, and the scientific community relative to radiological contamination, and to document compliance with federal, state, and local antipollution requirements. Amchitka's geographical setting, climate, geology, hydrology, and ecology are described. Site history including event information for LONG SHOT in 1965, MILROW in 1969, and CANNIKIN in 1971 is described. Event related contamination has been observed only at the LONG SHOT site. At this site, tritium in concentrations below the drinking water standards has been observed in mud pits and wells in the area adjacent to surface ground zero. The Long-Term Hydrologic Monitoring Program for Amchitka is described. No radioactive venting, significant radioactive leakage, or bioenvironmental damage resulted from any of the nuclear tests on Amchitka

  17. Dutch monitor on stress and physical load : risk factors, consequences, and preventive action

    NARCIS (Netherlands)

    Houtman, I.L.D.; Goudswaard, A.; Dhondt, S.; Grinten, M.P. van der; Hildebrandt, V.H.; Poel, E.G.T. van der

    1998-01-01

    Objectives - Due to recent changes in legislation on occupational health and safety, a national monitor on stress and physical load was developed in The Netherlands to monitor (a) risks and consequences of stress and physical load at work, (b) preventive actions in companies to reduce these risks,

  18. Ecological Monitoring and Compliance Program Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2001-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early

  19. [The marine coastal water monitoring program of the Italian Ministry of the Environment].

    Science.gov (United States)

    Di Girolamo, Irene

    2003-01-01

    The Ministry of the Environment carries out marine and coastal monitoring programs with the collaboration of the coastal Regions. The program in progress (2001-2003), on the basis of results of the previous one, has identified 73 particulary significant areas (57 critical areas and 16 control areas). The program investigates several parameters on water, plancton, sediments, mollusks and benthos with analyses fortnightly, six-monthly and annual. The main aim of these three year monitoring programs is to assess the quality of national marine ecosystem.

  20. 1994 Environmental monitoring drinking water and nonradiological effluent programs annual report

    International Nuclear Information System (INIS)

    Andersen, B.D.; Brock, T.A.; Meachum, T.R.

    1995-10-01

    EG ampersand G Idaho, Inc., initiated monitoring programs for drinking water in 1988 and for nonradiological parameters and pollutants in liquid effluents in 1985. These programs were initiated for the facilities operated by EG ampersand G Idaho for the US Department of Energy at the Idaho National Engineering Laboratory. On October 1, 1994, Lockheed Idaho Technologies Company (LITCO) replaced EG ampersand G Idaho as the prime contractor at the INEL and assumed responsibility for these programs. Section I discusses the general site characteristics, the analytical laboratories, and sampling methodology general to both programs. Section 2, the Drinking Water Program, tracks the bacteriological, chemical, and radiological parameters required by State and Federal regulations. This section describes the drinking water monitoring activities conducted at 17 LITCO-operated production wells and 11 distribution systems. It also contains all of the drinking water parameters detected and the regulatory limits exceeded during calendar year 1994. In addition, groundwater quality is discussed as it relates to contaminants identified at the wellhead for LITCO production wells. Section 3 discusses the nonradiological liquid effluent monitoring results for 27 liquid effluent streams. These streams are presented with emphasis on calendar year 1994 activities. All parameter measurements and concentrations were below the Resource Conservation and Recovery Act toxic characteristics limits

  1. The Savannah River Site's Groundwater Monitoring Program: Third quarter 1992

    International Nuclear Information System (INIS)

    Rogers, C.D.

    1993-01-01

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. Table 1 lists those well series with constituents in the groundwater above Flag 2 during third quarter 1992, organized by location. Results from all laboratory analyses are used to generate this table. Specific conductance and pH data from the field also are included in this table

  2. Defense Programs Transportation Risk Assessment

    International Nuclear Information System (INIS)

    Clauss, D.B.

    1994-01-01

    This paper provides an overview of the methodology used in a probabilistic transportation risk assessment conducted to assess the probabilities and consequences of inadvertent dispersal of radioactive materials arising from severe transportation accidents. The model was developed for the Defense Program Transportation Risk Assessment (DPTRA) study. The analysis incorporates several enhancements relative to previous risk assessments of hazardous materials transportation including newly-developed statistics on the frequencies and severities of tractor semitrailer accidents and detailed route characterization using the 1990 Census data

  3. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  4. Methodology for Designing Operational Banking Risks Monitoring System

    Science.gov (United States)

    Kostjunina, T. N.

    2018-05-01

    The research looks at principles of designing an information system for monitoring operational banking risks. A proposed design methodology enables one to automate processes of collecting data on information security incidents in the banking network, serving as the basis for an integrated approach to the creation of an operational risk management system. The system can operate remotely ensuring tracking and forecasting of various operational events in the bank network. A structure of a content management system is described.

  5. Community Radiation Monitoring Program. Annual report, October 1, 1991--September 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, E.N.

    1993-05-01

    The Community Radiation Monitoring Program (CRMP) is a cooperative effort between the US Department of Energy (DOE); the US Environmental Protection Agency (EPA); the Desert Research Institute (DRI), a division of the University and Community College System of Nevada and the Nuclear Engineering Laboratory of the University of Utah (UNEL). The twelfth year of the program began in the fall of 1991, and the work continues as an integral part of the DOE-sponsored long-term offsite radiological monitoring effort that has been conducted by EPA and its predecessors since the inception of nuclear testing at the Nevada Test Site (NTS). The program began as an outgrowth of activities that occurred during the Three Mile Island incident in 1979. The local interest and public participation that took place there were thought to be transferrable to the situation at the NTS, so, with adaptations, that methodology was implemented for this program. The CRMP began by enhancing and centralizing environmental monitoring and sampling equipment at 15 communities in the existing EPA monitoring network, and has since expanded to 19 locations in Nevada, Utah and California. The primary objectives of this program are still to increase the understanding by the people who live in the area surrounding the NTS of the activities for which DOE is responsible, to enhance the performance of radiological sampling and monitoring, and to inform all concerned of the results of these efforts. One of the primary methods used to improve the communication link with people in the potentially impacted area has been the hiring and training of local citizens as station managers and program representatives in those selected communities in the offsite area. These managers, active science teachers wherever possible, have succeeded, through their training, experience, community standing, and effort, in becoming a very visible, able and valuable asset in this link.

  6. Optimization of in-vivo monitoring program for radiation emergency response

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Wi Ho; Kim, Jong Kyung [Dept. of Nuclear Engineering, Hanyang University, Seoul (Korea, Republic of)

    2016-12-15

    In case of radiation emergencies, internal exposure monitoring for the members of public will be required to confirm internal contamination of each individual. In-vivo monitoring technique using portable gamma spectrometer can be easily applied for internal exposure monitoring in the vicinity of the on-site area. In this study, minimum detectable doses (MDDs) for '1'3'4Cs, {sup 137}Cs, and {sup 131}I were calculated adjusting minimum detectable activities (MDAs) from 50 to 1,000 Bq to find out the optimal in-vivo counting condition. DCAL software was used to derive retention fraction of Cs and I isotopes in the whole body and thyroid, respectively. A minimum detectable level was determined to set committed effective dose of 0.1 mSv for emergency response. We found that MDDs at each MDA increased along with the elapsed time. 1,000 Bq for {sup 134}Cs and {sup 137}Cs, and 100 Bq for {sup 131}I were suggested as optimal MDAs to provide in-vivo monitoring service in case of radiation emergencies. In-vivo monitoring program for emergency response should be designed to achieve the optimal MDA suggested from the present work. We expect that a reduction of counting time compared with routine monitoring program can achieve the high throughput system in case of radiation emergencies.

  7. Establishing a Program for Individuals at High Risk for Breast Cancer

    Science.gov (United States)

    Cadiz, Fernando; Kuerer, Henry M.; Puga, Julio; Camacho, Jamile; Cunill, Eduardo; Arun, Banu

    2013-01-01

    Our need to create a program for individuals at high risk for breast cancer development led us to research the available data on such programs. In this paper, we summarize our findings and our thinking process as we developed our own program. Breast cancer incidence is increasing worldwide. Even though there are known risk factors for breast cancer development, approximately 60% of patients with breast cancer have no known risk factor, although this situation will probably change with further research, especially in genetics. For patients with risk factors based on personal or family history, different models are available for assessing and quantifying risk. Assignment of risk levels permits tailored screening and risk reduction strategies. Potential benefits of specialized programs for women with high breast cancer risk include more cost -effective interventions as a result of patient stratification on the basis of risk; generation of valuable data to advance science; and differentiation of breast programs from other breast cancer units, which can result in increased revenue that can be directed to further improvements in patient care. Guidelines for care of patients at high risk for breast cancer are available from various groups. However, running a high-risk breast program involves much more than applying a guideline. Each high-risk program needs to be designed by its institution with consideration of local resources and country legislation, especially related to genetic issues. Development of a successful high-risk program includes identifying strengths, weaknesses, opportunities, and threats; developing a promotion plan; choosing a risk assessment tool; defining “high risk”; and planning screening and risk reduction strategies for the specific population served by the program. The information in this article may be useful for other institutions considering creation of programs for patients with high breast cancer risk. PMID:23833688

  8. Environmental monitoring program to NUCLEMON deposits in Botuxim - Itu

    International Nuclear Information System (INIS)

    1980-01-01

    An Environmental monitoring program to be executed in routine as caution against a possible contamination in adjacents regions of Radioactive Materials deposits sites of Santo Amaro (USAM)/NUCLEMON is presented. (author) [pt

  9. Characterization, Monitoring, and Sensor Technology Integrated Program (CMST-IP)

    International Nuclear Information System (INIS)

    1994-04-01

    The Characterization, Monitoring, and Sensor Technology Integrated Program seeks to deliver needed technologies, timely and cost-effectively, to the Office of Waste Management (EM-30), the Office of Environmental Restoration (EM-40), and the Office of Facility Transition and Management (EM-60). The scope of characterizations monitoring, and sensor technology needs that are required by those organizations encompass: (1) initial location and characterization of wastes and waste environments - prior to treatment; (2) monitoring of waste retrieval, remediation and treatment processes; (3) characterization of the co-position of final waste treatment forms to evaluate the performance of waste treatments processes; and (4) site closure and compliance monitoring. Wherever possible, the CMST-IP fosters technology transfer and commercialization of technologies that it sponsors

  10. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Science.gov (United States)

    2010-05-28

    ... DEPARTMENT OF THE TREASURY Terrorism Risk Insurance Program; Litigation Management Submissions... U.S.C. 3506(c)(2)(A)). Currently, the Terrorism Risk Insurance Program Office is seeking comments... or by mail (if hard copy, preferably an original and two copies) to: Terrorism Risk Insurance Program...

  11. Developing a Gap Taxonomy to Address Crew Health Risks in NASA's Human Research Program

    Science.gov (United States)

    Kundrot, Craig E.; Edwards, J. Michelle

    2009-01-01

    The mission of NASA's Human Research Program (HRP) is to understand and reduce the risk to crew health and performance in exploration missions. The HRP addresses 27 specific risks by identifying and then filling gaps in understanding the risks and in the ability to disposition the risks. The primary bases for identifying gaps have been past experience and requirements definition. This approach has been very effective in identifying some important, relevant gaps, but may be inadequate for identifying gaps outside the past experience base. We are exploring the use of a gap taxonomy as a comprehensive, underlying conceptual framework that allows a more systematic identification of gaps. The taxonomy is based on these stages in medical care: prediction, prevention, detection/diagnosis, treatment, monitoring, rehabilitation, and lifetime surveillance. This gap taxonomy approach identifies new gaps in HRP health risks. Many of the new gaps suggest risk reduction approaches that are more cost effective than present approaches. A major benefit of the gap taxonomy approach is to identify new, economical approaches that reduce the likelihood and/or consequence of a risk.

  12. Ecological Monitoring and Compliance Program 2006 Report

    Energy Technology Data Exchange (ETDEWEB)

    David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows

  13. Research, Monitoring, and Evaluation for the Federal Columbia River Estuary Program.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L. (Pacific Northwest National Laboratory)

    2008-02-20

    The purpose of this document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program, hereafter called 'the Estuary Program'. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows: (1) Understand the primary stressors affecting ecosystem controlling factors, such as ocean conditions and invasive species. (2) Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. (3) Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. (4) Maintain the food web to benefit salmonid performance. (5) Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. The goal leads to three primary management questions pertaining to the main focus of the Estuary Program: estuary habitat conservation and restoration. (1) Are the estuary habitat actions achieving the expected biological and environmental performance targets? (2) Are the offsite habitat actions in the estuary improving juvenile salmonid performance and which actions are most effective at addressing the limiting factors preventing achievement of habitat, fish, or wildlife performance objectives? (3) What are the limiting factors or threats in the estuary/ocean preventing the achievement of desired habitat or fish performance objectives? Performance measures

  14. 7 CFR 3052.525 - Criteria for Federal program risk.

    Science.gov (United States)

    2010-01-01

    ... ORGANIZATIONS Auditors § 3052.525 Criteria for Federal program risk. (a) General. The auditor's determination... to the Federal program. The auditor shall use auditor judgment and consider criteria, such as... part of the risk analysis, the auditor may wish to discuss a particular Federal program with auditee...

  15. Designing a flood-risk education program in the Netherlands

    NARCIS (Netherlands)

    Bosschaert, A.; van der Schee, J.; Kuiper, W.

    2016-01-01

    This study focused on designing a flood-risk education program to enhance 15-year-old students’ flood-risk perception. In the flood-risk education program, learning processes were modeled in such a way that the arousal of moderate levels of fear should prompt experiential and analytical information

  16. Monitoring risk-adjusted medical outcomes allowing for changes over time.

    Science.gov (United States)

    Steiner, Stefan H; Mackay, R Jock

    2014-10-01

    We consider the problem of monitoring and comparing medical outcomes, such as surgical performance, over time. Performance is subject to change due to a variety of reasons including patient heterogeneity, learning, deteriorating skills due to aging, etc. For instance, we expect inexperienced surgeons to improve their skills with practice. We propose a graphical method to monitor surgical performance that incorporates risk adjustment to account for patient heterogeneity. The procedure gives more weight to recent outcomes and down-weights the influence of outcomes further in the past. The chart is clinically interpretable as it plots an estimate of the failure rate for a "standard" patient. The chart also includes a measure of uncertainty in this estimate. We can implement the method using historical data or start from scratch. As the monitoring proceeds, we can base the estimated failure rate on a known risk model or use the observed outcomes to update the risk model as time passes. We illustrate the proposed method with an example from cardiac surgery. © The Author 2013. Published by Oxford University Press. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  17. Guide for monitoring effectiveness of utility Reliability Centered Maintenance (RCM) programs

    International Nuclear Information System (INIS)

    Midgett, W.D.; Wilson, J.F.; Krochmal, D.F.; Owsenek, L.W.

    1991-02-01

    Reliability centered maintenance (RCM) programs help utilities optimize preventive maintenance efforts while improving plant safety and economy through increased dependability of plant components. The project team developed this guide and accompanying methodology based on status updates from the Ginna and San Onofre demonstration projects. These updates addressed areas ranging from system selection to the effectiveness of RCM program implementation. In addition, the team incorporated information from a 12-utility survey soliciting opinions on the need for a methodology to monitor RCM cost-effectiveness. An analysis of the 12-utility survey showed that no techniques had been developed to measure RCM program cost-effectiveness. Thus, this guide addresses two key areas: Pros and cons of various monitoring techniques available to assess the overall effectiveness of RCM and a methodology for specifically evaluating the cost-effectiveness of RCM programs. 1 fig

  18. Report on the Watershed Monitoring Program at the Paducah Site January-December 1998

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Peterson, M.J.; Ryon, M.G.; Southworth, G.R.

    1999-03-01

    Watershed Monitoring of Big Bayou and Little Bayou creeks has been conducted since 1987. The monitoring was conducted by the University of Kentucky between 1987 and 1991 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 to present. The goals of monitoring are to (1) demonstrate that the effluent limitations established for DOE protect and maintain the use of Little Bayour and Big Bayou creeks for frowth and propagation of fish and other aquatic life, (2) characterize potential environmental impacts, and (3) document the effects of pollution abatement facilities on stream biota. The watershed (biological) monitoring discussed in this report was conducted under DOE Order 5400.1, General Environmental Protection Program. Future monitoring will be conducted as required by the Kentucky Pollutant Discharge Elimination System (KPDES) permit issued to the Department of Energy (DOE) in March 1998. A draft Watershed Monitoring Program plan was approved by the Kentucky Division of Water and will be finalized in 1999. The DOE permit also requires toxicity monitoring of one continuous outfall and of three intermittent outfalls on a quarterly basis. The Watershed Monitoring Program for the Paducah Site during calendar year 1998 consisted of three major tasks: (1) effluent toxicity monitoring, (2) bioaccumulation studies, and (3) ecological surveys of fish communities. This report focuses on ESD activities occurring from january 1998 to December 1998, although activities conducted outside this time period are included as appropriate.

  19. Environmental monitoring program design for uranium refining and conversion operations

    International Nuclear Information System (INIS)

    1984-08-01

    The objective of this study was to develop recommendations for the design of environmental monitoring programs at Canadian uranium refining and conversion operations. In order to develop monitoring priorities, chemical and radioactive releases to the air and water were developed for reference uranium refining and conversion facilities. The relative significance of the radioactive releases was evaluated through a pathways analysis which estimated dose to individual members of the critical receptor group. The effects of chemical releases to the environment were assessed by comparing predicted air and water contaminant levels to appropriate standards or guidelines. For the reference facilities studied, the analysis suggested that environmental effects are likely to be dominated by airborne release of both radioactive and nonradioactive contaminants. Uranium was found to be the most important radioactive species released to the air and can serve as an overall indicator of radiological impacts for any of the plants considered. The most important nonradioactive air emission was found to be fluoride (as hydrogen fluoride) from the uranium hexafluoride plant. For the uranium trioxide and uranium dioxide plants, air emissions of oxides of nitrogen were considered to be most important. The study recommendations for the design of an environmental monitoring program are based on consideration of those factors most likely to affect local air and water quality, and human radiation exposure. Site- and facility-specific factors will affect monitoring program design and the selection of components such as sampling media, locations and frequency, and analytical methods

  20. 1986 environmental monitoring program report for the Idaho National Engineering Laboratory Site

    International Nuclear Information System (INIS)

    Hoff, D.L.; Chew, E.W.; Rope, S.K.

    1987-05-01

    This report presents onsite and offsite data collected in 1986 for the routine environmental monitoring program conducted by the Radiological and Environmental Sciences Laboratory (RESL) of the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL) Site. The purpose of this routine program is to monitor radioactive and nonradioactive materials resulting from INEL Site operations which may reach the surrounding offsite environment and population. This report is prepared in accordance with the DOE requirements in draft DOE Order 5484.1 and is not intended to cover the numerous special environmental research programs being conducted at the INEL by RESL and others

  1. A novel and cost-effective monitoring approach for outcomes in an Australian biodiversity conservation incentive program.

    Directory of Open Access Journals (Sweden)

    David B Lindenmayer

    Full Text Available We report on the design and implementation of ecological monitoring for an Australian biodiversity conservation incentive scheme - the Environmental Stewardship Program. The Program uses competitive auctions to contract individual land managers for up to 15 years to conserve matters of National Environmental Significance (with an initial priority on nationally threatened ecological communities. The ecological monitoring was explicitly aligned with the Program's policy objective and desired outcomes and was applied to the Program's initial Project which targeted the critically endangered White Box-Yellow Box-Blakely's Red Gum Grassy Woodland and Derived Native Grassland ecological community in south eastern Australia. These woodlands have been reduced to <3% of their original extent and persist mostly as small remnants of variable condition on private farmland. We established monitoring sites on 153 farms located over 172,232 sq km. On each farm we established a monitoring site within the woodland patch funded for management and, wherever possible, a matched control site. The monitoring has entailed gathering data on vegetation condition, reptiles and birds. We also gathered data on the costs of experimental design, site establishment, field survey, and data analysis. The costs of monitoring are approximately 8.5% of the Program's investment in the first four years and hence are in broad accord with the general rule of thumb that 5-10% of a program's funding should be invested in monitoring. Once initial monitoring and site benchmarking are completed we propose to implement a novel rotating sampling approach that will maintain scientific integrity while achieving an annual cost-efficiency of up to 23%. We discuss useful lessons relevant to other monitoring programs where there is a need to provide managers with reliable early evidence of program effectiveness and to demonstrate opportunities for cost-efficiencies.

  2. Improvements in valve reliability due to implementation of effective condition monitoring programs

    International Nuclear Information System (INIS)

    Hale, Stan

    2003-01-01

    Modern diagnostic systems for motor-operated valves, pneumatic control valves and checkvalves have facilitated a shift in the maintenance philosophy for valves and actuators in nuclear power plants from schedule based to condition-based maintenance (CBM). This shift enables plant management to focus resources and schedule priority on the plant equipment that warrants attention thereby not wasting resources or increasing the human factors risk on equipment that has not degraded. The most recent initiatives combine condition monitoring with risk/safety insights to focus attention and resonances on the right equipment at the right time consistent with each component's safety-significance. The activities of the ASME working groups responsible for nuclear O and M codes have kept pace with the technology and process improvements necessary to maximize the technical and economic benefits of condition based and risk informed maintenance. This paper discusses adoption of valve condition monitoring in the nuclear power industry, changes to ASME codes and standards during the 90's to facilitate adoption of condition monitoring technology for in-service testing and recent efforts to combine risk insights with condition monitoring strategies to achieve the highest level of valve reliability and nuclear safety without over inflating maintenance cost. (author)

  3. PROBABILITY SURVEYS , CONDITIONAL PROBABILITIES AND ECOLOGICAL RISK ASSESSMENT

    Science.gov (United States)

    We show that probability-based environmental resource monitoring programs, such as the U.S. Environmental Protection Agency's (U.S. EPA) Environmental Monitoring and Assessment Program, and conditional probability analysis can serve as a basis for estimating ecological risk over ...

  4. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species

  5. Implementation of internal monitoring programs for workers occupationally exposed by 131I in nuclear medicine services in Brazil

    International Nuclear Information System (INIS)

    Oliveira, S.M.; Dantas, A.L.A.; Dantas, B.M.

    2017-01-01

    In nuclear medicine services (NMS), workers routinely handle radionuclides for diagnostic and therapy. This practice represents a risk of incorporation by these radionuclides. The International Atomic Energy Agency (IAEA) recommends the implementation of an internal monitoring program on workers exposed to annual effective doses greater than 1 mSv, as for example, those who handle 131 I for therapy in NMS. Currently, in Brazil, there are not enough available laboratories qualified to provide internal monitoring services to attend all possible demand of internal monitoring if it such regulation were applied by the Brazilian Nuclear Regulatory Board (CNEN). The objective of this work is to disseminate simple and inexpensive methods for in vivo routine thyroid monitoring of 131 I using equipment available in the NMS. Devices available in two public hospitals located in the city of Rio de Janeiro were calibrated for use in occupational internal monitoring. The equipment evaluated in this work presented enough sensitivity for such application, being suitable to access intakes of 131 I in the thyroid and able to estimate doses below 1 mSv. (author)

  6. In Vivo Monitoring Program Manual, PNL-MA-574, Rev 5.1

    Energy Technology Data Exchange (ETDEWEB)

    Lynch, Timothy P.

    2011-09-12

    The following sections provide an overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes the organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance.

  7. Development of full power risk monitoring system for UCN 3 and 4 nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Seung Hwan; Jang, Seung Chul; Kim, Kil Yoo; Han, Sang Hoon; Jung, Won Dae

    2002-03-01

    This report describes full power risk monitoring system (DynaRM) of NPPs which evaluates the current plant risk and monitor the risk change caused by the configuration change due to preventive maintenance or periodic maintenance activities. In order to calculate the core damage frequency, the inoperable equipment's basic event should be submitted to a quantification engine. DynaRM uses a risk monitor model converted from PSA model as the quantification engine, which can respond fast for the various equipment configuration changes. DynaRM is developed to solve these kinds of problems and difficulties. The main two key features of DynaRM are real time risk monitoring and real time maintenance plan decision supporting. With DynaRM, the plant risk can be calculated automatically only with out of service equipment information and equipment maintenance scheduling is easy by modifying the detail schedule plan. We have developed the DynaRM for the Korean standard nuclear power plant and it is currently using at Ulchin 3,4 NPP. The adaptation for the other NPPs is also easy with a little modification since DynaRM was developed by considering it to be used in the other NPPs. Moreover, we also expect DynaRM will be a good advisory tool for the plant risk monitoring and maintenance scheduling

  8. Development of intergrated accident management assessment technology; development of interface modules of risk-monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Kang, S. K.; Park, S. K.; Seok, H.; Kim, D. K.; Han, J. K.; Park, B. R. [KOPEC, Taejeon (Korea)

    2002-03-01

    Based on the development of interface modules with FORTE.- DynaRM can quantify risk model very fast (Very frequent risk model quantification is needed for configuration risk management).- risk monitoring system technology transfer to foreign NPPs. Contribution to component failure and maintenance control automation with the development of Tagging control System. On-Line risk monitoring system development by joint team between Korea Atomic Energy Research Institute and KOPEC is a request by KEPCO. The softwares developed in this study is easily implemented at domestic NPPs without extra study or cost. Economic benefit and Software export to foreign NPPs are expected because of the development of technology related to risk monitoring system and its management. 6 refs., 3 figs., 1 tab. (Author)

  9. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    International Nuclear Information System (INIS)

    Kszos, L.A.; Adams, S.M.; Ashwood, T.L.; Blaylock, B.G.; Greeley, M.S.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Shoemaker, B.A.; Hinzman, R.L.

    1993-02-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions

  10. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L. A.; Adams, S. M.; Ashwood, T. L.; Blaylock, B. G.; Greeley, M. S.; Loar, J. M.; Peterson, M. J.; Ryon, M. G.; Smith, J. G.; Southworth, G. R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Environmental Sciences Div.; Shoemaker, B. A. [Oak Ridge K-25 Site, TN (United States); Hinzman, R. L. [Oak Ridge Research Inst., TN (United States)

    1993-02-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions.

  11. An Interoperable System toward Cardiac Risk Stratification from ECG Monitoring

    Directory of Open Access Journals (Sweden)

    Cristina Soguero-Ruiz

    2018-03-01

    Full Text Available Many indices have been proposed for cardiovascular risk stratification from electrocardiogram signal processing, still with limited use in clinical practice. We created a system integrating the clinical definition of cardiac risk subdomains from ECGs and the use of diverse signal processing techniques. Three subdomains were defined from the joint analysis of the technical and clinical viewpoints. One subdomain was devoted to demographic and clinical data. The other two subdomains were intended to obtain widely defined risk indices from ECG monitoring: a simple-domain (heart rate turbulence (HRT, and a complex-domain (heart rate variability (HRV. Data provided by the three subdomains allowed for the generation of alerts with different intensity and nature, as well as for the grouping and scrutinization of patients according to the established processing and risk-thresholding criteria. The implemented system was tested by connecting data from real-world in-hospital electronic health records and ECG monitoring by considering standards for syntactic (HL7 messages and semantic interoperability (archetypes based on CEN/ISO EN13606 and SNOMED-CT. The system was able to provide risk indices and to generate alerts in the health records to support decision-making. Overall, the system allows for the agile interaction of research and clinical practice in the Holter-ECG-based cardiac risk domain.

  12. An Interoperable System toward Cardiac Risk Stratification from ECG Monitoring

    Science.gov (United States)

    Mora-Jiménez, Inmaculada; Ramos-López, Javier; Quintanilla Fernández, Teresa; García-García, Antonio; Díez-Mazuela, Daniel; García-Alberola, Arcadi

    2018-01-01

    Many indices have been proposed for cardiovascular risk stratification from electrocardiogram signal processing, still with limited use in clinical practice. We created a system integrating the clinical definition of cardiac risk subdomains from ECGs and the use of diverse signal processing techniques. Three subdomains were defined from the joint analysis of the technical and clinical viewpoints. One subdomain was devoted to demographic and clinical data. The other two subdomains were intended to obtain widely defined risk indices from ECG monitoring: a simple-domain (heart rate turbulence (HRT)), and a complex-domain (heart rate variability (HRV)). Data provided by the three subdomains allowed for the generation of alerts with different intensity and nature, as well as for the grouping and scrutinization of patients according to the established processing and risk-thresholding criteria. The implemented system was tested by connecting data from real-world in-hospital electronic health records and ECG monitoring by considering standards for syntactic (HL7 messages) and semantic interoperability (archetypes based on CEN/ISO EN13606 and SNOMED-CT). The system was able to provide risk indices and to generate alerts in the health records to support decision-making. Overall, the system allows for the agile interaction of research and clinical practice in the Holter-ECG-based cardiac risk domain. PMID:29494497

  13. The Savannah River Site's groundwater monitoring program

    Energy Technology Data Exchange (ETDEWEB)

    1991-05-06

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.

  14. Community-monitoring program surrounding the Nevada Test Site: one year of experience

    International Nuclear Information System (INIS)

    Douglas, G.S.

    1983-05-01

    Since 1954, the US Public Health Service and later the US Environmental Protection Agency Laboratory in Las Vegas, Nevada, have been responsible for conducting a program of environmental radiation monitoring and public radiation safety associated with nuclear weapons tests conducted by the United States. A recent major innovation in this long-term program has been the establishment of a network of Community Monitoring Stations in 15 offsite communities. The new network supplements existing networks operated for nearly three decades in these and other offsite communities. It differs from other networks in the continuing offsite radiation monitoring and public safety program in that it incorporates Federal, State, and local Government participation. This report reviews the history of offsite radiation surveillance leading to institution of the new network and describes the first year of experience with its equipment, methodology, and management as well as its impact on citizens of the communities involved

  15. Extreme Conditioning Programs: Potential Benefits and Potential Risks.

    Science.gov (United States)

    Knapik, Joseph J

    2015-01-01

    CrossFit, Insanity, Gym Jones, and P90X are examples of extreme conditioning programs (ECPs). ECPs typically involve high-volume and high-intensity physical activities with short rest periods between movements and use of multiple joint exercises. Data on changes in fitness with ECPs are limited to CrossFit investigations that demonstrated improvements in muscle strength, muscular endurance, aerobic fitness, and body composition. However, no study has directly compared CrossFit or other ECPs to other more traditional forms of aerobic and resistance training within the same investigation. These direct comparisons are needed to more adequately evaluate the effectiveness of ECPs. Until these studies emerge, the comparisons with available literature suggest that improvements in CrossFit, in terms of muscular endurance (push-ups, sit-ups), strength, and aerobic capacity, appear to be similar to those seen in more traditional training programs. Investigations of injuries in ECPs are limited to two observational studies that suggest that the overall injury rate is similar to that seen in other exercise programs. Several cases of rhabdomyolysis and cervical carotid artery dissections have been reported during CrossFit training. The symptoms, diagnosis, and treatment of these are reviewed here. Until more data on ECPs emerge, physical training should be aligned with US Army doctrine. If ECPs are included in exercise programs, trainers should (1) have appropriate training certifications, (2) inspect exercise equipment regularly to assure safety, (3) introduce ECPs to new participants, (4) ensure medical clearance of Soldiers with special health problems before participation in ECPs, (4) tailor ECPs to the individual Soldier, (5) adjust rest periods to optimize recovery and reduce fatigue, (6) monitor Soldiers for signs of overtraining, rhabdomyolysis, and other problems, and (7) coordinate exercise programs with other unit training activities to eliminate redundant activities

  16. The Savannah River Site's Groundwater Monitoring Program 1991 well installation report

    International Nuclear Information System (INIS)

    1992-06-01

    This report is a summary of the well and environmental soil boring information compiled for the groundwater monitoring program of the Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) at the Savannah River Site (SRS) during 1991. It includes discussion of environmental soil borings, surveying, well installations, abandonments, maintenance, and stabilization

  17. Community radiation monitoring program. Annual report, October 1, 1992--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, E.N.

    1994-08-01

    The Community Radiation Monitoring Program (CRMP) is a cooperative effort between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), the Desert Research Institute (DRI), a division of the University and Community College System of Nevada, and the Nuclear Engineering Laboratory of the University of Utah (UUNEL). The thirteenth year of this program began in the fall of 1992, and the work continues as an integral part of the DOE--sponsored long-term offsite radiological monitoring effort that has been conducted by EPA and its predecessors since the inception of nuclear testing at the Nevada Test Site (NTS). The CRMP began by enhancing and centralizing environmental monitoring and sampling equipment at 15 communities in the then-existing EPA monitoring network around the NTS, and has since expanded to 19 locations in Nevada, Utah, and California. The primary objectives of this program are still to increase the understanding by the people who live in the area surrounding the NTS of the activities for which DOE is responsible, to enhance the performance of radiological sampling and monitoring, and to inform all concerned of the results of these efforts. One of the primary methods used to improve the communication link with the people in the potentially impacted area has been the hiring and training of local citizens as Station Managers and program representatives in those selected communities in the offsite area. These mangers, active science teachers wherever possible, have succeeded through their training, experience, community standing, and effort in becoming a very visible, able, and valuable asset in this link.

  18. Community radiation monitoring program. Annual report, October 1, 1992--September 30, 1993

    International Nuclear Information System (INIS)

    Cooper, E.N.

    1994-08-01

    The Community Radiation Monitoring Program (CRMP) is a cooperative effort between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), the Desert Research Institute (DRI), a division of the University and Community College System of Nevada, and the Nuclear Engineering Laboratory of the University of Utah (UUNEL). The thirteenth year of this program began in the fall of 1992, and the work continues as an integral part of the DOE--sponsored long-term offsite radiological monitoring effort that has been conducted by EPA and its predecessors since the inception of nuclear testing at the Nevada Test Site (NTS). The CRMP began by enhancing and centralizing environmental monitoring and sampling equipment at 15 communities in the then-existing EPA monitoring network around the NTS, and has since expanded to 19 locations in Nevada, Utah, and California. The primary objectives of this program are still to increase the understanding by the people who live in the area surrounding the NTS of the activities for which DOE is responsible, to enhance the performance of radiological sampling and monitoring, and to inform all concerned of the results of these efforts. One of the primary methods used to improve the communication link with the people in the potentially impacted area has been the hiring and training of local citizens as Station Managers and program representatives in those selected communities in the offsite area. These mangers, active science teachers wherever possible, have succeeded through their training, experience, community standing, and effort in becoming a very visible, able, and valuable asset in this link

  19. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    Science.gov (United States)

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  20. Establishing monitoring programs for travel time reliability. [supporting datasets

    Science.gov (United States)

    2014-01-01

    The objective of this project was to develop system designs for programs to monitor travel time reliability and to prepare a guidebook that practitioners and others can use to design, build, operate, and maintain such systems. Generally, such travel ...

  1. Ecological Monitoring and Compliance Program 2006 Report

    Energy Technology Data Exchange (ETDEWEB)

    David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows

  2. Perceived parental monitoring and health risk behavior among public secondary school students in El Salvador.

    Science.gov (United States)

    Springer, Andrew E; Sharma, Shreela; de Guardado, Alba Margarita; Nava, Francisco Vázquez; Kelder, Steven H

    2006-12-28

    Although parental monitoring has received considerable attention in studies of U.S. adolescents, few published studies have examined how parents' knowledge of their children's whereabouts may influence health risk behaviors in adolescents living in Latin America. We investigated the association between perceived parental monitoring and substance use, fighting, and sexual behaviors in rural and urban Salvadoran adolescents (n = 982). After adjusting for several sociodemographic covariates, multilevel regression analyses indicated that students reporting low parental monitoring were between 2 to 3.5 times more likely to report risk behaviors examined. The promotion of specific parenting practices such as parental monitoring may hold promise for reducing adolescent risk behaviors in El Salvador.

  3. The Savannah River Site's Groundwater Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-10

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

  4. Towards a global terrestrial species monitoring program

    Science.gov (United States)

    Schmeller, Dirk S.; Julliard, Romain; Bellingham, Peter J.; Böhm, Monika; Brummitt, Neil; Chiarucci, Alessandro; Couvet, Denis; Elmendorf, Sarah; Forsyth, David M.; Moreno, Jaime García; Gregory, Richard D.; Magnusson, William E.; Martin, Laura J.; McGeoch, Melodie A.; Mihoub, Jean-Baptiste; Pereira, Henrique M.; Proença, Vânia; van Swaay, Chris A.M.; Yahara, Tetsukazu; Belnap, Jayne

    2015-01-01

    Introduction: The Convention for Biological Diversity’s (CBD) Strategic Plan for Biodiversity 2011-2020 envisions that “By 2050, biodiversity is valued, conserved, restored and wisely used, maintaining ecosystem services, sustaining a healthy planet and delivering benefits essential for all people.” Although 193 parties have adopted these goals, there is little infrastructure in place to monitor global biodiversity trends. Recent international conservation policy requires such data to be up-to-date, reliable, comparable among sites, relevant, and understandable; as is becoming obvious from the work plan adopted by the Intergovernmental Panel for Biodiversity and Ecosystem Services (IPBES: www.ipbes.net/; http://tinyurl.com/ohdnknq). In order to meet the five strategic goals of the Strategic Plan for Biodiversity 2011-2020 and its 20 accompanying Aichi Targets for 2020 (www.cbd.int/sp/targets/), advances need to be made in coordinating large-scale biodiversity monitoring and linking these with environmental data to develop a comprehensive Global Observation Network, as is the main idea behind GEOSS the Global Earth Observation System of Systems (Christian 2005)...Here we identify ten requirements important for the successful implementation of a global biodiversity monitoring network under the flag of GEO BON and especially a global terrestrial species monitoring program.

  5. Study of Commercial Bank Risk Monitoring Model in Individual Consumption Credit

    Institute of Scientific and Technical Information of China (English)

    刘春红

    2003-01-01

    With the development of individual consumption credit (ICC) in China, commercial banks have been exposed to more and more risks. The loan failure has been an important problem that the banking must face and revolve. This paper develops a factor system to explain how the borrower's risk is affected, and then establishes a risk monitoring model with AHP to pre-warn the banks how much the risk is.

  6. Risk-based technical specifications program: Site interview results

    International Nuclear Information System (INIS)

    Andre, G.R.; Baker, A.J.; Johnson, R.L.

    1991-08-01

    The Electric Power Research Institute and Pacific Gas and Electric Company are sponsoring a program directed at improving Technical Specifications using risk-based methods. The major objectives of the program are to develop risk-based approaches to improve Technical Specifications and to develop an Interactive Risk Advisor (IRA) prototype. The IRA is envisioned as an interactive system that is available to plant personnel to assist in controlling plant operation. Use of an IRA is viewed as a method to improve plant availability while maintaining or improving plant safety. In support of the program, interviews were conducted at several PWR and BWR plant sites, to elicit opinions and information concerning risk-based approaches to Technical Specifications and IRA requirements. This report presents the results of these interviews, including the functional requirements of an IRA. 2 refs., 6 figs., 2 tabs

  7. The role of conservation programs in drought risk adaptation

    Science.gov (United States)

    Steven Wallander; Marcel Aillery; Daniel Hellerstein; Michael Hand

    2013-01-01

    This report evaluates the extent to which farms facing higher levels of drought risk are more likely to participate in conservation programs, and fi nds a strong link between drought risk and program participation. Prior research has shown that climate-related risk exposure infl uences production decisions such as crop choice; our research shows that adaptation also...

  8. Data-driven risk identification in phase III clinical trials using central statistical monitoring

    OpenAIRE

    Timmermans, Catherine; Venet, David; Burzykowski, Tomasz

    2016-01-01

    Our interest lies in quality control for clinical trials, in the context of risk-based monitoring (RBM). We specifically study the use of central statistical monitoring (CSM) to support RBM. Under an RBM paradigm, we claim that CSM has a key role to play in identifying the "risks to the most critical data elements and processes" that will drive targeted oversight. In order to support this claim, we first see how to characterize the risks that may affect clinical trials. We then discuss how CS...

  9. Evaluating a Health Risk Reduction Program.

    Science.gov (United States)

    Nagelberg, Daniel B.

    1981-01-01

    A health risk reduction program at Bowling Green State University (Ohio) tested the efficacy of peer education against the efficacy of returning (by mail) health questionnaire results. A peer health education program did not appear to be effective in changing student attitudes or lifestyles; however, the research methodology may not have been…

  10. Data verification and evaluation techniques for groundwater monitoring programs

    International Nuclear Information System (INIS)

    Mercier, T.M.; Turner, R.R.

    1990-12-01

    To ensure that data resulting from groundwater monitoring programs are of the quality required to fulfill program objectives, it is suggested that a program of data verification and evaluation be implemented. These procedures are meant to supplement and support the existing laboratory quality control/quality assurance programs by identifying aberrant data resulting from a variety of unforeseen circumstances: sampling problems, data transformations in the lab, data input at the lab, data transfer, end-user data input. Using common-sense principles, pattern recognition techniques, and hydrogeological principles, a computer program was written which scans the data for suspected abnormalities and produces a text file stating sample identifiers, the suspect data, and a statement of how the data has departed from the expected. The techniques described in this paper have been developed to support the Y-12 Plant Groundwater Protection Program Management Plan

  11. Subsidence monitoring program at Cyprus Coal's Colorado operations

    International Nuclear Information System (INIS)

    Stewart, C.L.; Shoemaker, J.E.

    1992-01-01

    Published subsidence data for the western United States is limited in comparison with data for the east. This paper summarizes the results of a subsidence monitoring program above two longwall panels at the Foidel Creek Mine located in northwest Colorado. The monitoring area is characterized by overburden ranging from 1000 ft to 1100 ft in thickness. the surface slope parallels the dip of the bedding at approximately 5 deg. Average mining height is 9 ft. Smax averaged 3.4 ft. Draw angles averaged 15 deg for up-dip ribsides and 19 deg for down-dip ribsides. A site-specific profile function is developed from the data

  12. Guam Long-term Coral Reef Monitoring Program Reef Fish Surveys since 2010

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Government of Guam's Long-term Coral Reef Monitoring Program, coordinated by the Guam Coastal Management Program until October 2013 and now coordinated by the...

  13. Guam Long-term Coral Reef Monitoring Program Macroinvertebrate Belt Transects since 2010

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Government of Guam's Long-term Coral Reef Monitoring Program, coordinated by the Guam Coastal Management Program until October 2013 and now coordinated by the...

  14. 1984 Environmental monitoring program report for Idaho National Engineering Laboratory Site

    International Nuclear Information System (INIS)

    Hoff, D.L.; Chew, E.W.; Dickson, R.L.

    1985-05-01

    The results of the various monitoring programs for 1984 indicated that radioactivity from INEL Site operations could not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the Site. Although some radioactive materials were discharged during Site operations, concentrations and doses to the surrounding population were of no health consequence and were far less than State of Idaho and federal health protection guidelines. This report describes the air, water, and foodstuff samples routinely collected at the INEL boundary locations and at locations distant from the INEL Site; and it compares and evaluates the sample results, discussing implications, if any. The report also summarizes significant environmental activities at the INEL Site during 1984, nonradioactive and radioactive effluent monitoring at the Site, and the US Geological Survey (USGS) groundwater monitoring program. 28 refs., 13 figs., 22 tabs

  15. The Savannah River Site`s Groundwater Monitoring Program: Third quarter 1992

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1993-02-04

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. Table 1 lists those well series with constituents in the groundwater above Flag 2 during third quarter 1992, organized by location. Results from all laboratory analyses are used to generate this table. Specific conductance and pH data from the field also are included in this table.

  16. A monitoring program of the histograms based on ROOT package

    International Nuclear Information System (INIS)

    Zhou Yongzhao; Liang Hao; Chen Yixin; Xue Jundong; Yang Tao; Gong Datao; Jin Ge; Yu Xiaoqi

    2002-01-01

    KHBOOK is a histogram monitor and browser based on ROOT package, which reads the histogram file in HBOOK format from Physmon, converts it into ROOT format, and browses the histograms in Repeat and Overlap modes to monitor and trace the quality of the data from DAQ. KHBOOK is a program of small memory, easy maintenance and fast running as well, using mono-behavior classes and a communication class of C ++

  17. Yucca Mountain Biological Resources Monitoring Program. Progress report, October 1992--December 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of (as amended in 1987) to study and characterize the suitability of Yucca Mountain as a potential geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a potential repository. To ensure that site characterization activities do not adversely affect the environment at Yucca Mountain, a program has been implemented to monitor and mitigate potential impacts and ensure activities comply with applicable environmental regulations. This report describes the activities and accomplishments of EG ampersand G Energy Measurements, Inc. (EG ampersand G/EM) from October 1992 through December 1993 for six program areas within the Terrestrial Ecosystem component of the environmental program for the Yucca Mountain Site Characterization Project (YMP): Site Characterization Effects, Desert Tortoises (Gopherus agassizii), Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support

  18. Yucca Mountain Biological Resources Monitoring Program. Progress report, January 1994--December 1994

    International Nuclear Information System (INIS)

    1995-07-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize the suitability of Yucca Mountain as a potential geological repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a potential repository. To ensure that site characterization activities do not adversely affect the environment at Yucca Mountain, a program has been implemented to monitor and mitigate potential impacts and ensure activities comply with applicable environmental regulations. This report describes the activities and accomplishments of EG and G Energy Measurements, Inc. (EG and G/EM) from January 1994 through December 1994 for six program areas within the Terrestrial Ecosystem component of the environmental program for the Yucca Mountain Site Characterization Project (YMP): Site Characterization Effects, Desert Tortoises (Gopherus agassizii), Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support

  19. Data-driven risk identification in phase III clinical trials using central statistical monitoring.

    Science.gov (United States)

    Timmermans, Catherine; Venet, David; Burzykowski, Tomasz

    2016-02-01

    Our interest lies in quality control for clinical trials, in the context of risk-based monitoring (RBM). We specifically study the use of central statistical monitoring (CSM) to support RBM. Under an RBM paradigm, we claim that CSM has a key role to play in identifying the "risks to the most critical data elements and processes" that will drive targeted oversight. In order to support this claim, we first see how to characterize the risks that may affect clinical trials. We then discuss how CSM can be understood as a tool for providing a set of data-driven key risk indicators (KRIs), which help to organize adaptive targeted monitoring. Several case studies are provided where issues in a clinical trial have been identified thanks to targeted investigation after the identification of a risk using CSM. Using CSM to build data-driven KRIs helps to identify different kinds of issues in clinical trials. This ability is directly linked with the exhaustiveness of the CSM approach and its flexibility in the definition of the risks that are searched for when identifying the KRIs. In practice, a CSM assessment of the clinical database seems essential to ensure data quality. The atypical data patterns found in some centers and variables are seen as KRIs under a RBM approach. Targeted monitoring or data management queries can be used to confirm whether the KRIs point to an actual issue or not.

  20. Rehabilitation in COPD: the long-term effect of a supervised 7-week program succeeded by a self-monitored walking program

    DEFF Research Database (Denmark)

    Ringbaek, T; Brøndum, E; Martinez, G

    2008-01-01

    rehabilitation program combined with daily self-monitored training at home on exercise tolerance and health status. Two hundred and nine consecutive COPD patients who had completed a 7-week pulmonary rehabilitation program were assessed with endurance shuttle walk test (ESWT) and the St George's Respiratory...... change in SGRQ +2.0 (p = 0.40). A relative simple and inexpensive 7-week supervised rehabilitation program combined with daily self-monitored training at home was able to maintain significant improvement in exercise tolerance and health status throughout 1 year. Death and hospital admissions due to acute...

  1. The Meteorological Monitoring program at a former nuclear weapons plant

    International Nuclear Information System (INIS)

    Maxwell, D.R.; Bowen, B.M.

    1994-01-01

    The purpose of the Meteorological Monitoring program at Rocky Flats Plant (RFP) is to provide meteorological information for use in assessing the transport, and diffusion, and deposition of effluent actually or potentially released into the atmosphere by plant operations. Achievement of this objective aids in protecting health and safety of the public, employees, and environment, and directly supports Emergency Response programs at RFP. Meteorological information supports the design of environmental monitoring networks for impact assessments, environmental surveillance activities, remediation activities, and emergency responses. As the mission of the plant changes from production of nuclear weapons parts to environmental cleanup and economic development, smaller releases resulting from remediation activities become more likely. These possible releases could result from airborne fugitive dust, evaporation from collection ponds, or grass fires

  2. Computer program analyzes and monitors electrical power systems (POSIMO)

    Science.gov (United States)

    Jaeger, K.

    1972-01-01

    Requirements to monitor and/or simulate electric power distribution, power balance, and charge budget are discussed. Computer program to analyze power system and generate set of characteristic power system data is described. Application to status indicators to denote different exclusive conditions is presented.

  3. Program of radiological monitoring environmental a nuclear facility in latency

    International Nuclear Information System (INIS)

    Blas, A. de; Riego, A.; Batalla, E.; Tapia, C.; Garcia, R.; Sanchez, J.; Toral, J.

    2013-01-01

    This paper presents the Radiological Environmental Monitoring program of the Vandellos I nuclear power plant in the latency period. This facility was dismantled to level 2, as defined by the International Atomic Energy Agency. The program is an adaptation of the implanted one during the dismantling, taking into account the isotopes that may be present, as well as the main transfer routes. Along with the description of the program the results obtained in the latent period from 2005 until 2012 are presented.

  4. Monitoring of good practices programs and independence for electricity and natural gas system operators. Report 2012

    International Nuclear Information System (INIS)

    2013-09-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 8. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2012. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2012 and audits carried out by the CRE services in these companies in 2012

  5. Monitoring of good practices programs and independence for electricity and natural gas system operators. 2010 report

    International Nuclear Information System (INIS)

    2011-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 6. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2010. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2010 and audits carried out by the CRE services in these companies in 2010

  6. Ecological Monitoring and Compliance Program Fiscal Year 2001 report

    International Nuclear Information System (INIS)

    Wills, C.A.

    2001-01-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early April. A

  7. Perceived Parental Monitoring and Health Risk Behavior among Public Secondary School Students in El Salvador

    Directory of Open Access Journals (Sweden)

    Andrew E. Springer

    2006-01-01

    Full Text Available Although parental monitoring has received considerable attention in studies of U.S. adolescents, few published studies have examined how parents' knowledge of their children's whereabouts may influence health risk behaviors in adolescents living in Latin America. We investigated the association between perceived parental monitoring and substance use, fighting, and sexual behaviors in rural and urban Salvadoran adolescents (n = 982. After adjusting for several sociodemographic covariates, multilevel regression analyses indicated that students reporting low parental monitoring were between 2 to 3.5 times more likely to report risk behaviors examined. The promotion of specific parenting practices such as parental monitoring may hold promise for reducing adolescent risk behaviors in El Salvador.

  8. Implementation of internal monitoring programs for workers occupationally exposed by {sup 131}I in nuclear medicine services in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, S.M.; Dantas, A.L.A.; Dantas, B.M., E-mail: salomao.marques@ymail.com [Instituto de Radioproteção e Dosimetria (IRD/CNEN-RJ), Rio de Janeiro, RJ (Brazil). Div. de Dosimetria

    2017-07-01

    In nuclear medicine services (NMS), workers routinely handle radionuclides for diagnostic and therapy. This practice represents a risk of incorporation by these radionuclides. The International Atomic Energy Agency (IAEA) recommends the implementation of an internal monitoring program on workers exposed to annual effective doses greater than 1 mSv, as for example, those who handle {sup 131}I for therapy in NMS. Currently, in Brazil, there are not enough available laboratories qualified to provide internal monitoring services to attend all possible demand of internal monitoring if it such regulation were applied by the Brazilian Nuclear Regulatory Board (CNEN). The objective of this work is to disseminate simple and inexpensive methods for in vivo routine thyroid monitoring of {sup 131}I using equipment available in the NMS. Devices available in two public hospitals located in the city of Rio de Janeiro were calibrated for use in occupational internal monitoring. The equipment evaluated in this work presented enough sensitivity for such application, being suitable to access intakes of {sup 131}I in the thyroid and able to estimate doses below 1 mSv. (author)

  9. The Canadian National Calibration Reference Center for Bioassay and in-vivo Monitoring: A program summary

    International Nuclear Information System (INIS)

    Kramer, G.H.; Zamora, M.L.

    1994-01-01

    The Canadian National Calibration Reference Center for Bioassay and in-vivo Monitoring is part of the Radiation Protection Bureau, Department of Health. The Reference Center operates a variety of different intercomparison programs that are designed to confirm that workplace monitoring results are accurate and provide the necessary external verification required by the Canadian regulators. The programs administered by the Reference Center currently include urinalysis intercomparisons for tritium, natural uranium, and 14 C, and in-vivo programs for whole-body, thorax, and thyroid monitoring. The benefits of the intercomparison programs to the participants are discussed by example. Future programs that are planned include dual spiked urine sample which contain both tritium and 14 C and the in-vivo measurement of 99m Tc. 18 refs., 1 fig., 2 tabs

  10. Structuring a risk-based bioassay program for uranium usage in university laboratories

    Science.gov (United States)

    Dawson, Johnne Talia

    Bioassay programs are integral in a radiation safety program. They are used as a method of determining whether individuals working with radioactive material have been exposed and have received a resulting dose. For radionuclides that are not found in nature, determining an exposure is straightforward. However, for a naturally occurring radionuclide like uranium, it is not as straightforward to determine whether a dose is the result of an occupational exposure. The purpose of this project is to address this issue within the University of Nevada, Las Vegas's (UNLV) bioassay program. This project consisted of two components that studied the effectiveness of a bioassay program in determining the dose for an acute inhalation of uranium. The first component of the plan addresses the creation of excretion curves, utilizing MATLAB that would allow UNLV to be able to determine at what time an inhalation dose can be attributed to. The excretion curves were based on the ICRP 30 lung model, as well as the Annual Limit Intake (ALI) values located in the Nuclear Regulatory Commission's 10CFR20 which is based on ICRP 30 (International Commission on Radiological Protection). The excretion curves would allow UNLV to be able to conduct in-house investigations of inhalation doses without solely depending on outside investigations and sources. The second component of the project focused on the creation of a risk based bioassay program to be utilized by UNLV that would take into account bioassay frequency that depended on the individual. Determining the risk based bioassay program required the use of baseline variance in order to minimize the investigation of false positives among those individuals who undergo bioassays for uranium work. The proposed program was compared against an evaluation limit of 10 mrem per quarter, an investigational limit of 125 mrem per quarter, and the federal/state requirement of 1.25 rem per quarter. It was determined that a bioassay program whose bioassay

  11. Ecological Monitoring and Compliance Program 2014 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Derek B. [National Security Technologies, LLC, Las Vegas, Nevada (United States); Anderson, David C. [National Security Technologies, LLC, Las Vegas, Nevada (United States); Greger, Paul D. [National Security Technologies, LLC, Las Vegas, Nevada (United States); Ostler, W. Kent [National Security Technologies, LLC, Las Vegas, Nevada (United States)

    2015-05-12

    (Crotalus mitchellii), and several species of cacti. NSTec provided to project managers a written summary report of all survey findings and mitigation recommendations, where applicable. Of the 18 projects on the NNSS, 15 occurred within the range of the threatened desert tortoise. Approximately 2.19 ha of desert tortoise habitat were disturbed. No desert tortoises were accidentally injured or killed by project activities, and no tortoises were killed by vehicles. On 13 occasions, tortoises were moved off the road and out of harm’s way. Six tortoises were found and transmitters attached as part of an approved study to assess impacts of vehicles on tortoises on the NNSS. NSTec biologists continued to monitor 37 juvenile desert tortoises as part of a collaborative effort to study survival and temperament of translocated animals. From 1978 until 2013, there has been an average of 11.2 wildland fires per year on the NNSS with an average of about 83.7 ha burned per fire. There were no wildland fires documented on the NNSS during 2014. Results from the wildland fuel surveys showed a very low risk of wildland fire due to reduced fuel loads caused by limited natural precipitation. Limited reptile trapping and reptile roadkill surveys were conducted to better define species distribution on the NNSS. Sixteen reptiles were trapped representing five species. Combined with data from 2013, 183 road kills were detected, representing 11 snake and 8 lizard species. Selected natural water sources were monitored to assess trends in physical and biological parameters, and one new water source was found. Wildlife use at five water troughs and four radiologically contaminated sumps was documented using motion-activated cameras. As part of the statewide effort to disseminate information throughout the botanical community, NSTec prepared a shape file with site-specific data for all 17 sensitive plants on the NNSS and provided it to the Nevada Natural Heritage Program for inclusion in their

  12. Active Sites Environmental Monitoring Program: Mid-FY 1991 report

    Energy Technology Data Exchange (ETDEWEB)

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1991-10-01

    This report summarizes the activities of the Active Sites Environmental Monitoring Program (ASEMP) from October 1990 through March 1991. The ASEMP was established in 1989 by Solid Waste Operations and the Environmental Sciences Division to provide early detection and performance monitoring at active low-level radioactive waste (LLW) disposal sites in Solid Waste Storage Area (SWSA) 6 and transuranic (TRU) waste storage sites in SWSA 5 as required by chapters II and III of US Department of Energy Order 5820.2A. Monitoring results continue to demonstrate the no LLW is being leached from the storage vaults on the tumulus pads. Loading of vaults on Tumulus II began during this reporting period and 115 vaults had been loaded by the end of March 1991.

  13. The Savannah River Site's Groundwater Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  14. Long-Term Hydrologic Monitoring Program, Gnome site, Eddy County, New Mexico

    International Nuclear Information System (INIS)

    1982-01-01

    The Gnome site is located in Eddy County, approximately 31 miles southeast of the city of Carlsbad, New Mexico. Project Gnome, with a yield of 3.1 kilotons, was detonated December 10, 1961. It was the first nuclear detonation designed specifically for peaceful purposes and the first underground event of the Plowshare Program to take place outside the Nevada Test Site. The purpose of the Long-Term Hydrologic Monitoring Program at the Gnome site is to obtain data that will assure the public safety; inform the public, the news media, and the scientific community relative to radiological contamination; and to document compliance with federal, state, and local antipollution requirements. The Gnome site geographical setting, climate, geology, and hydrology are described. Site history, including Gnome event information and pre- and post-Gnome monitoring by the US Public Health Service and the USGS, is described. Site cleanups of 1968 and 1979 are described. Postoperational surveys indicate that the Gnome site is well below the established decontamination criteria and that no hazard exists or will likely occur during public use of the surface of the Gnome site. The Long-Term Hydrologic Monitoring Program for the Gnome site is described

  15. Active Sites Environmental Monitoring Program: FY 1990 annual report

    International Nuclear Information System (INIS)

    Wickliff, D.S.; Morrissey, C.M.; Ashwood, T.L.

    1991-10-01

    Chapter 3 of US Department of Energy (DOE) Order 5820.2A (DOE 1988) sets forth requirements for environmental monitoring of active low-level waste (LLW) disposal sites. Active sites are defined as those LLW facilities that were in use on or after the date of the order (September 1988). The transuranic (TRU) waste storage areas in Solid Waste Storage Area (SWSA) 5 North are covered by Chap. 2 of the order. In both chapters, monitoring is required to provide for early warning of leaks before those leaks pose a threat to human health or the environment. Chapter 3 also requires that monitoring be conducted to evaluate the short- and long-term performance of LLW disposal facilities. In accordance with this order, the Solid Waste Operations Department at Oak Ridge National Laboratory (ORNL) has established an Active Sites Environmental Monitoring Program (ASEMP) that is implemented by staff of the Environmental Sciences Division (ESD) at ORNL. This report summarizes data from ASEMP monitoring activities for the final 6 months of FY 1990. A brief summary of the monitoring methodology for each site is presented also

  16. 22 CFR 226.51 - Monitoring and reporting program performance.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 226.51 Section 226.51 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF... more frequently than quarterly or, less frequently than annually. Annual reports shall be due 90...

  17. Big Bayou Creek and Little Bayou Creek Watershed Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Peterson, M.J.; Ryon; Smith, J.G.

    1999-03-01

    Biological monitoring of Little Bayou and Big Bayou creeks, which border the Paducah Site, has been conducted since 1987. Biological monitoring was conducted by University of Kentucky from 1987 to 1991 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 through March 1999. In March 1998, renewed Kentucky Pollutant Discharge Elimination System (KPDES) permits were issued to the US Department of Energy (DOE) and US Enrichment Corporation. The renewed DOE permit requires that a watershed monitoring program be developed for the Paducah Site within 90 days of the effective date of the renewed permit. This plan outlines the sampling and analysis that will be conducted for the watershed monitoring program. The objectives of the watershed monitoring are to (1) determine whether discharges from the Paducah Site and the Solid Waste Management Units (SWMUs) associated with the Paducah Site are adversely affecting instream fauna, (2) assess the ecological health of Little Bayou and Big Bayou creeks, (3) assess the degree to which abatement actions ecologically benefit Big Bayou Creek and Little Bayou Creek, (4) provide guidance for remediation, (5) provide an evaluation of changes in potential human health concerns, and (6) provide data which could be used to assess the impact of inadvertent spills or fish kill. According to the cleanup will result in these watersheds [Big Bayou and Little Bayou creeks] achieving compliance with the applicable water quality criteria.

  18. Mapping real-time air pollution health risk for environmental management: Combining mobile and stationary air pollution monitoring with neural network models.

    Science.gov (United States)

    Adams, Matthew D; Kanaroglou, Pavlos S

    2016-03-01

    Air pollution poses health concerns at the global scale. The challenge of managing air pollution is significant because of the many air pollutants, insufficient funds for monitoring and abatement programs, and political and social challenges in defining policy to limit emissions. Some governments provide citizens with air pollution health risk information to allow them to limit their exposure. However, many regions still have insufficient air pollution monitoring networks to provide real-time mapping. Where available, these risk mapping systems either provide absolute concentration data or the concentrations are used to derive an Air Quality Index, which provides the air pollution risk for a mix of air pollutants with a single value. When risk information is presented as a single value for an entire region it does not inform on the spatial variation within the region. Without an understanding of the local variation residents can only make a partially informed decision when choosing daily activities. The single value is typically provided because of a limited number of active monitoring units in the area. In our work, we overcome this issue by leveraging mobile air pollution monitoring techniques, meteorological information and land use information to map real-time air pollution health risks. We propose an approach that can provide improved health risk information to the public by applying neural network models within a framework that is inspired by land use regression. Mobile air pollution monitoring campaigns were conducted across Hamilton from 2005 to 2013. These mobile air pollution data were modelled with a number of predictor variables that included information on the surrounding land use characteristics, the meteorological conditions, air pollution concentrations from fixed location monitors, and traffic information during the time of collection. Fine particulate matter and nitrogen dioxide were both modelled. During the model fitting process we reserved

  19. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  20. Development of a risk monitor for research reactor

    International Nuclear Information System (INIS)

    Agrawal, Mayank; Mathur, D.; Joshi, N.S.; Varde, P.V.

    2014-01-01

    The traditional approach to engineering asset management, which primarily includes management and operation and maintenance activities, in a nuclear plant is based on engineering judgment. Here, the defence-in-depth and conservative criteria form the basis of decisions. Ideally, it is expected that the decisions should be based on performance of systems, structures and components (SSC), which should also take plant safety margin into consideration. Probabilistic methods are widely used as a compliment to deterministic methods in assessing safety of nuclear reactors. A risk-based operations and maintenance management system has been developed for a research reactor. The results of a level-1 PSA study in terms of minimal cut-set equations along with other engineering plant information forms major input for this system. The system is expected to be operational in plant control room conditions in support of routine decisions. This paper presents one of the main applications of the plant Level-1 Probabilistic Safety Assessment, developed from plant specific data i.e. a risk monitor. The risk monitor has several applications that support in decision making. It is expected that the use of this system in real-time scenario will provide improved understanding of safety on one hand while enabling enhancement of plant economics on the other. Some the case studies are discussed here. (author)

  1. Environmental auditing: Capabilities and management utility of recreation impact monitoring programs

    Science.gov (United States)

    Marion, J.L.

    1995-01-01

    A recreation impact monitoring system was developed and applied in 1984?1986 and in 1991 to all backcountry river-accessed campsites within Delaware Water Gap National Recreation Area, Pennsylvania and New Jersey. Results suggest that actions implemented by park managers in response to problems identified by the initial survey were highly effective in reducing resource degradation caused by camping. In particular, the elimination of some designated campsites and installation of anchored firegrates reduced the total area of disturbance by 50%. Firegrate installation provided a focal point that increased the concentration of camping activities, allowing peripheral areas to recover. As suggested by predictive models, additional resource degradation caused by increased camping intensities is more than offset by improvements in the condition of areas where use is eliminated. The capabilities and management utility of recreation impact monitoring programs, illustrated by the Delaware Water Gap monitoring program, are also presented and discussed.

  2. Automated Instrumentation, Monitoring and Visualization of PVM Programs Using AIMS

    Science.gov (United States)

    Mehra, Pankaj; VanVoorst, Brian; Yan, Jerry; Lum, Henry, Jr. (Technical Monitor)

    1994-01-01

    We present views and analysis of the execution of several PVM (Parallel Virtual Machine) codes for Computational Fluid Dynamics on a networks of Sparcstations, including: (1) NAS Parallel Benchmarks CG and MG; (2) a multi-partitioning algorithm for NAS Parallel Benchmark SP; and (3) an overset grid flowsolver. These views and analysis were obtained using our Automated Instrumentation and Monitoring System (AIMS) version 3.0, a toolkit for debugging the performance of PVM programs. We will describe the architecture, operation and application of AIMS. The AIMS toolkit contains: (1) Xinstrument, which can automatically instrument various computational and communication constructs in message-passing parallel programs; (2) Monitor, a library of runtime trace-collection routines; (3) VK (Visual Kernel), an execution-animation tool with source-code clickback; and (4) Tally, a tool for statistical analysis of execution profiles. Currently, Xinstrument can handle C and Fortran 77 programs using PVM 3.2.x; Monitor has been implemented and tested on Sun 4 systems running SunOS 4.1.2; and VK uses XIIR5 and Motif 1.2. Data and views obtained using AIMS clearly illustrate several characteristic features of executing parallel programs on networked workstations: (1) the impact of long message latencies; (2) the impact of multiprogramming overheads and associated load imbalance; (3) cache and virtual-memory effects; and (4) significant skews between workstation clocks. Interestingly, AIMS can compensate for constant skew (zero drift) by calibrating the skew between a parent and its spawned children. In addition, AIMS' skew-compensation algorithm can adjust timestamps in a way that eliminates physically impossible communications (e.g., messages going backwards in time). Our current efforts are directed toward creating new views to explain the observed performance of PVM programs. Some of the features planned for the near future include: (1) ConfigView, showing the physical topology

  3. Risk evaluation and monitoring in multiple sclerosis therapeutics.

    Science.gov (United States)

    Clanet, Michel C; Wolinsky, Jerry S; Ashton, Raymond J; Hartung, Hans-Peter; Reingold, Stephen C

    2014-09-01

    Risk for multiple sclerosis (MS) disease-modifying therapies (DMT) must be assessed on an ongoing basis. Early concerns regarding the first-approved DMTs for MS have been mitigated, but recently licensed therapies have been linked to possibly greater risks. The objective of this review is to discuss risk assessment in MS therapeutics based on an international workshop and comprehensive literature search and recommend strategies for risk assessment/monitoring. Assessment and perception of therapeutic risks vary between patients, doctors and regulators. Acceptability of risk depends on the magnitude of risk and the demonstrated clinical benefits of any agent. Safety signals must be distinguishable from chance occurrences in a clinical trial and in long-term use of medications. Post-marketing research is crucial for assessing longer-term safety in large patient cohorts. Reporting of adverse events is becoming more proactive, allowing more rapid identification of risks. Communication about therapeutic risks and their relationship to clinical benefit must involve patients in shared decision making. It is difficult to produce a general risk-assessment algorithm for all MS therapies. Specific algorithms are required for each DMT in every treated-patient population. New and evolving risks must be evaluated and communicated rapidly to allow patients and physicians to be well informed and able to share treatment decisions. © The Author(s) 2013.

  4. A guide to processing bat acoustic data for the North American Bat Monitoring Program (NABat)

    Science.gov (United States)

    Reichert, Brian; Lausen, Cori; Loeb, Susan; Weller, Ted; Allen, Ryan; Britzke, Eric; Hohoff, Tara; Siemers, Jeremy; Burkholder, Braden; Herzog, Carl; Verant, Michelle

    2018-06-14

    The North American Bat Monitoring Program (NABat) aims to improve the state of conservation science for all species of bats shared by the United States, Canada, and Mexico. To accomplish this goal, NABat offers guidance and standardized protocols for acoustic monitoring of bats. In this document, “A Guide to Processing Bat Acoustic Data for the North American Bat Monitoring Program (NABat),” we provide general recommendations and specific workflows for the process of identifying bat species from acoustic files recorded using the NABat stationary point and mobile transect acoustic monitoring protocols.

  5. Video Monitoring a Simulation-Based Quality Improvement Program in Bihar, India.

    Science.gov (United States)

    Dyer, Jessica; Spindler, Hilary; Christmas, Amelia; Shah, Malay Bharat; Morgan, Melissa; Cohen, Susanna R; Sterne, Jason; Mahapatra, Tanmay; Walker, Dilys

    2018-04-01

    Simulation-based training has become an accepted clinical training andragogy in high-resource settings with its use increasing in low-resource settings. Video recordings of simulated scenarios are commonly used by facilitators. Beyond using the videos during debrief sessions, researchers can also analyze the simulation videos to quantify technical and nontechnical skills during simulated scenarios over time. Little is known about the feasibility and use of large-scale systems to video record and analyze simulation and debriefing data for monitoring and evaluation in low-resource settings. This manuscript describes the process of designing and implementing a large-scale video monitoring system. Mentees and Mentors were consented and all simulations and debriefs conducted at 320 Primary Health Centers (PHCs) were video recorded. The system design, number of video recordings, and inter-rater reliability of the coded videos were assessed. The final dataset included a total of 11,278 videos. Overall, a total of 2,124 simulation videos were coded and 183 (12%) were blindly double-coded. For the double-coded sample, the average inter-rater reliability (IRR) scores were 80% for nontechnical skills, and 94% for clinical technical skills. Among 4,450 long debrief videos received, 216 were selected for coding and all were double-coded. Data quality of simulation videos was found to be very good in terms of recorded instances of "unable to see" and "unable to hear" in Phases 1 and 2. This study demonstrates that video monitoring systems can be effectively implemented at scale in resource limited settings. Further, video monitoring systems can play several vital roles within program implementation, including monitoring and evaluation, provision of actionable feedback to program implementers, and assurance of program fidelity.

  6. 9 CFR 147.14 - Procedures to determine status and effectiveness of sanitation monitored program.

    Science.gov (United States)

    2010-01-01

    ... status and effectiveness of sanitation monitored program. The following monitoring procedures 10 may be applied at the discretion of the Official State Agency: 10 Laboratory procedures for monitoring operations... egg conalbumin; and (ii) Tetrathionate selective enrichment broths, competitor-controlling plating...

  7. Development of a Community Radiation Monitoring program near a nuclear industrial facility

    International Nuclear Information System (INIS)

    Pauley, B.J.; Maxwell, D.R.

    1992-01-01

    The Community Radiation Monitoring (ComRad) program is a cooperative effort of the DOE, Rocky Flats Office (RFO), EG ampersand G, and surrounding communities. The intent of the ComRad program is to establish radiation and meteorological monitoring stations in the communities for their independent control and use. The primary objectives of the ComRad program are to provide (1) public education, (2) active participation of the public, and (3) better community relations. The ComRad program involves establishing new offsite environmental surveillance stations to be operated and managed by local community science teachers. The general public will be invited to inspect the air quality instrumentation and results displayed. The instrumentation for each station will include a gamma counter, weather station, high-volume (Hi-Vol) air sampler, and thermoluminescent dosimeter (TLD). The purpose of this paper is to describe the operation of the ComRad program emphasizing program objectives, organizational responsibility, participation by community technical representatives, station managers and alternate station managers training, and data dissemination to the public

  8. Framework for ensuring appropriate maintenance of baseline PSA and risk monitor models in a nuclear power plant

    International Nuclear Information System (INIS)

    Vrbanic, I.; Sorman, J.

    2005-01-01

    The necessity of observing both long term and short term risk changes many times imposes the need for a nuclear power plant to have a baseline PSA model to produce an estimate of long term averaged risk and a risk monitor to produce a time-dependent risk curve and/or safety functions status at points in time or over a shorter time period of interest. By nature, a baseline PSA reflects plant systems and operation in terms of average conditions and provides time-invariant quantitative risk metrics. Risk monitor, on the other hand, requires condition-specific modeling to produce a quantitative and/or qualitative estimate of plant's condition-specific risk metrics. While risk monitor is used for computing condition-specific risk metrics over time, a baseline PSA model is needed for variety of other risk oriented applications, such as assessments of proposed design modifications or risk ranking of equipment. Having in mind their importance and roles, it is essential that both models, i.e. baseline PSA model and risk monitor are maintained in the way that they represent, as accurately as practically achievable, the actual plant status (e.g. systems' design and plant's procedures in effect) and its history (e.g. numbers of equipment failures and demands that influence relevant PSA parameters). Paper discusses the requirements for appropriate maintenance of plant's baseline PSA model and risk monitor model and presents the framework for plant's engineering and administrative procedures that would ensure they are met. (author)

  9. Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program

    International Nuclear Information System (INIS)

    McGuire, L.L.

    1991-01-01

    The Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program serves two purposes. The first is to track temperature trends during normal plant operation in areas where suspected deviations from established environmental profiles exist. This includes the use of Resistance Temperature Detectors, Recorders, and Temperature Dots for evaluation of equipment qualified life for comparison with tested parameters and the established Environmental Design Profile. It also may be used to determine the location and duration of steam leaks for effect on equipment qualified life. The second purpose of this program is to aid HVAC design engineers in determining the source of heat outside anticipated design parameters. Resistance Temperature Detectors, Recorders, and Temperature Dots are also used for this application but the results may include design changes to eliminate the excess heat or provide qualified equipment (cable) to withstand the elevated temperature, splitting of environmental zones to capture accurate temperature parameters, or continued environmental monitoring for evaluation of equipment located in hot spots

  10. Internal quality control program for individual monitoring service

    Energy Technology Data Exchange (ETDEWEB)

    Mauricio, Claudia L.P.; Moura Junior, Jose; Patrao, Karla C.S. [Instituto de Radioprotecao e Dosimetria (IRD/CNEN-RJ), Rio de Janeiro, RJ (Brazil)]. E-mail: claudia@ird.gov.br; moura@ird.gov.br; karla@ird.gov.br

    2007-07-01

    With a focus on continuous improvement, since 2002, a special internal procedure for following and checking the performance of our individual monitoring services has been implemented. A fictitious installation, named 'Fantasma' has been created, initially, with 4 film badges and 7 thermoluminescent dosimetric ring users. Since 2005, this quality control program includes also the albedo neutron individual monitoring service. Monthly, the 'Fantasma' test monitors are irradiated by traceable Cs-137 and Am-Be sources. The calibration quantities are: the photon dose equivalent (H{sub x}) for the photographic individual monitor, the maximum dose equivalent (MADE) for the albedo neutron individual monitor and the personal dose equivalent at 0.07 mm depth (H{sub p}(0.07)) for ring monitor. Up to now, all results show compliance with the specific trumpet curves acceptance limits. Once, a small sub-evaluation tendency has been noted and this information was used to improve the film system. For the photographic film system, the evaluated value to reference dose ratios range from 0.71 to 1.12, with a mean value of 0.91 {+-} 0.12. For the ring system, the ratio ranges from 0.69 to 1.40, with a mean value of 1.02 {+-} 0.07. For the neutron system, which presents intrinsic larger uncertainties, the ratio ranged from 0.67 to 1.88, with mean value of 1.16 {+-} 0.27. (author)

  11. Volatile Organic Compound (VOC) Air Monitoring Program design for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Frank, L.

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Volatile Organic Compound (VOC) Monitoring Program has been developed as part of the Department of Energy's (DOE's) No-Migration Variance petition submitted to the Environmental Protection Agency (EPA). The program is designed to demonstrate that there will be no migration of hazardous chemicals past the unit boundary in concentrations which exceed any health-based standards. The monitoring program will use EPA compendium Method TO-14. Both air and carbon sorption media samples will be collected as part of the program. Eleven separate monitoring sites have been selected where both 24-hour integrated and 1-hour grab samples will be collected and analyzed for five target compounds. The bin-scale experimental test rooms will be configured with a gas collection manifold and an activated carbon sorption bed to remove VOCs before they can be emitted into the WIPP underground atmosphere. 10 refs., 4 figs., 7 tabs

  12. Technical monitoring and economical assessment of the micro-financed solar program in Bangladesh

    Energy Technology Data Exchange (ETDEWEB)

    Wiese, Rafael [PSE AG, Freiburg (Germany); Steidl, Michael [Micro Service Consult GmbH, Frankenthal (Germany)

    2011-07-01

    The Solar Home System (SHS) dissemination program in Bangladesh is considered to be one of the most successful programs of its kind worldwide. Between 2005 and 2010 nearly 750,000 SHS have been installed, the vast majority is at 50 Wp. Systems have been implemented in rural areas where grid electricity supply is neither available nor envisaged in the mid-term future. Supported by international grants and soft loans, monthly installation rates have increased to over 30,000 SHS. The program management responsibility lies with the Infrastructure Development Company Limited (IDCOL). Around 20 micro-finance institutions (MFI) are responsible for the technical and financial implementation. They provide micro-financing to enable their customers to purchase the SHS. The authors carried out a technical monitoring of more than 5.000 SHS since 2007. In general it was found that nearly all systems are operational and only 7% had technical problems which required immediate repairs to prevent technical failure of the SHS. The main problems in this category were damages to or bypassing of the charge controller. The authors also assessed the financial performance of the MFIs. As a result, measures for credit risk management were introduced which have strengthen the financial performance. (orig.)

  13. 12 CFR 615.5181 - Bank interest rate risk management program.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Bank interest rate risk management program. 615... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5181 Bank interest rate risk management program. (a) The board of directors of each Farm Credit Bank...

  14. Technical Report on Preliminary Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Ramuhalli, Pradeep; Coles, Garill A.; Coble, Jamie B.; Hirt, Evelyn H.

    2013-09-17

    Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. AdvSMRs may provide a longer-term alternative to traditional light-water reactors (LWRs) and SMRs based on integral pressurized water reactor concepts currently being considered. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment. AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors. Some of this loss can be recovered through reduced capital costs through smaller size, fewer components, modular fabrication processes, and the opportunity for modular construction. However, the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments that are a step towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results from an initial methodology for enhanced risk monitors by integrating real-time information about equipment condition and POF into risk monitors.

  15. Statistical package for improved analysis of hillslope monitoring data collected as part of the Board of Forestry's long-term monitoring program

    Science.gov (United States)

    Jack Lewis; Jim Baldwin

    1997-01-01

    The State of California has embarked upon a Long-Term Monitoring Program whose primary goal is to assess the effectiveness of the Forest Practice Rules and Review Process in protecting the beneficial uses of waters from the impacts of timber operations on private timberlands. The Board of Forestry's Monitoring Study Group concluded that hillslope monitoring should...

  16. Environmental monitoring plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1992-09-01

    The Environmental Monitoring Plan (EMP) for the Oak Ridge Reservation (ORR) is an omnibus document providing a single point of reference for the effluent monitoring and environmental surveillance programs of Oak Ridge National Laboratory (ORNL), Y-12 Plant, K-25 Site, and ORR areas outside specific facility boundaries. Authorization and requirement for the EMP are contained in Department of Energy (DOE) Order 5400.1 Chapter 4, which states that environmental monitoring consists of two major activities: effluent monitoring and environmental surveillance. This EMP is intended to document the rationale and design criteria for the effluent monitoring and environmental surveillance programs, extent and frequency of sampling and analysis, analytical laboratory procedures, quality assurance, implementation, and reporting. The EMP describes one of several programs that collect and analyze data to assess the impacts of ORR on the environment and human health. Others include the Environmental Restoration Program and the Clinch River Remedial Investigation Program. While the ultimate goal for DOE may be to integrate information from all these programs into a formalized assessment of risk to ecosystems and human health, that level of integration is beyond the scope of the EMP. The EMP outlines the goals of environmental monitoring for the ORR and its facilities and includes activities that are not presently conducted. In general, the programs described in this EMP represent an increase in surveillance activities over past practices

  17. Geological storage of CO2: risks analysis, monitoring and measures. Final report

    International Nuclear Information System (INIS)

    Abou Akar, A.; Audibert, N.; Audigane, P.; Baranger, P.; Bonijoly, D.; Carnec, C.; Czernichowski, I.; Debeglia, N.; Fabriol, H.; Foerster, E.; Gaus, I.; Le Nindre, Y.; Michel, K.; Morin, D.; Roy, S.; Sanjuan, B.; Sayedi, D.

    2005-01-01

    To use the CO 2 geological storage as a coherent solution in the greenhouse gases reduction it needs to answer to safety and monitoring conditions. In this framework the BRGM presents this study in six chapters: risks analysis, the monitoring methods (geochemistry, geophysics, aerial monitoring, biochemistry, hydrogeology), the metrology, the corrosion problems, the thermal, hydrodynamical, geochemical and mechanical simulation and the today and future regulations. (A.L.B.)

  18. A proposed methodology for performing risk analysis of state radiation control programs

    International Nuclear Information System (INIS)

    Dornsife, W.P.

    1996-01-01

    This paper is comprised of viewgraphs from a conference presentation. Topics discussed include barriers to effective risk assessment and management, and real versus perceived risk for various radiation programs in the state of Pennsylvania. Calculation results for Pennsylvania are provided for low-level radioactive waste transportation risks, indoor radon risk, and cancer morbidity risk from x-rays. A methodology for prioritizing radiation regulatory programs based on risk is presented with calculations for various Pennsylvania programs

  19. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results

  20. Monitoring control program as a tool for regulatory control

    International Nuclear Information System (INIS)

    Silva Peres, Sueli da; Lauria, Dejanaira C.; Martins, Nadia S.F.; Rio, Monica A.P.

    2008-01-01

    Full text: The Institute of Radiation Protection and Dosimetry (IRD) of the Brazilian Commission of Nuclear Energy (CNEN) is responsible for developing, establishing and carrying out an independent assessment to verify the adequacy, effectiveness and accuracy of environmental radiological control carried out by licensed and controlled facilities. This independent assessment is performed by Environmental Monitoring Control Program (MCP). The MCP is a regulatory control and its main goal is to provide public and environment with an appropriate protection level against harmful effects of ionising radiation. The main purpose of the MCP is to verify whether applicable requirements prescribed by legislation are met, the environmental radiological control of the facilities are adequate and effective and the facilities are able to generate valid measuring results. The MCP is carried out in order to evaluate the quality of environmental radiation monitoring programs (EMP) and the effectiveness of their implementation, sampling conditions in the field, changes of environmental aspects in the impact area, adequacy of and adherence to procedures established and other applicable documents, technical competence of the staff and the necessary resources to ensure the required quality of the EMP. The MCP has been performed by activities should include inspecting and auditing of several types of nuclear and radioactive facilities. The inspection programme include the joint sampling program (CCP). The aim of the CCP is to check data of environmental monitoring of operator. The MCP was implemented in 1994. Ever since several problems related to the environmental control performed by operator was identified. The most important of them include problems related to the preparation and analysis of environmental samples, training of personnel, necessary resources, adherence of procedures to the purpose of the monitoring, fulfillment of procedures established, adequacy of the EMP and EMP

  1. Evaluation of Haddam Neck (Connecticut Yankee) Nuclear Power Plant, environmental impact prediction, based on monitoring programs

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Mahaffey, J.A.; Waton, D.G.

    1976-12-01

    A study was undertaken by the U.S. Nuclear Regulatory Commission (NRC) to evaluate the nonradiological environmental data obtained from three nuclear power plants operating for a period of one year or longer. The document presented reports the second of three nuclear power plants to be evaluated in detail by Battelle, Pacific Northwest Laboratories. Haddam Neck (Connecticut Yankee) Nuclear Power Plant nonradiological monitoring data were assessed to determine their effectiveness in the measurement of environmental impacts. Efforts were made to determine if: (1) monitoring programs, as designed, can detect environmental impacts, (2) appropriate statistical analyses were performed and if they were sensitive enough to detect impacts, (3) predicted impacts could be verified by monitoring programs, and (4) monitoring programs satisfied the requirements of the Environmental Technical Specifications. Both preoperational and operational monitoring data were examined to test the usefulness of baseline information in evaluating impacts. This included an examination of the methods used to measure ecological, chemical, and physical parameters, and an assessment of sampling periodicity and sensitivity where appropriate data sets were available. From this type of analysis, deficiencies in both preoperational and operational monitoring programs may be identified and provide a basis for suggested improvement

  2. Application of Risk Management for Control and Monitoring Systems

    CERN Document Server

    Grau, S; Balda, F; Chouvelon, A

    2001-01-01

    This paper presents an application of the state of the art and new trends for risk management of safety-related control and monitoring systems, currently applied in the industry. These techniques not only enable to manage safety and reliability issues but they also help in the control of quality and economic factors affected by the availability and maintenance of the system. The method includes an unambiguous definition of the system in terms of functions and a systematic analysis of hazardous situations, undesired events and possible malfunctions. It also includes the identification and quantification of the risk associated to the system. The required risk reduction is specified in terms of safety integrity levels. The safety integrity level results in requirements, preventive measures, possible improvements and recommendations to assure the satisfactory management of the risk.

  3. Mitigating fall risk: A community fall reduction program.

    Science.gov (United States)

    Reinoso, Humberto; McCaffrey, Ruth G; Taylor, David W M

    One fourth of all American's over 65 years of age fall each year. Falls are a common and often devastating event that can pose a serious health risk for older adults. Healthcare providers are often unable to spend the time required to assist older adults with fall risk issues. Without a team approach to fall prevention the system remains focused on fragmented levels of health promotion and risk prevention. The specific aim of this project was to engage older adults from the community in a fall risk assessment program, using the Stopping Elderly Accidents, Deaths & Injuries (STEADI) program, and provide feedback on individual participants' risks that participants could share with their primary care physician. Older adults who attended the risk screening were taking medications that are known to increase falls. They mentioned that their health care providers do not screen for falls and appreciated a community based screening. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  5. Health-Based Capitation Risk Adjustment in Minnesota Public Health Care Programs

    Science.gov (United States)

    Gifford, Gregory A.; Edwards, Kevan R.; Knutson, David J.

    2004-01-01

    This article documents the history and implementation of health-based capitation risk adjustment in Minnesota public health care programs, and identifies key implementation issues. Capitation payments in these programs are risk adjusted using an historical, health plan risk score, based on concurrent risk assessment. Phased implementation of capitation risk adjustment for these programs began January 1, 2000. Minnesota's experience with capitation risk adjustment suggests that: (1) implementation can accelerate encounter data submission, (2) administrative decisions made during implementation can create issues that impact payment model performance, and (3) changes in diagnosis data management during implementation may require changes to the payment model. PMID:25372356

  6. Workplace Violence Training Programs for Health Care Workers: An Analysis of Program Elements.

    Science.gov (United States)

    Arbury, Sheila; Hodgson, Michael; Zankowski, Donna; Lipscomb, Jane

    2017-06-01

    Commercial workplace violence (WPV) prevention training programs differ in their approach to violence prevention and the content they present. This study reviews 12 such programs using criteria developed from training topics in the Occupational Safety and Health Administration's (OSHA) Guidelines for Preventing Workplace Violence for Healthcare and Social Service Workers and a review of the WPV literature. None of the training programs addressed all the review criteria. The most significant gap in content was the lack of attention to facility-specific risk assessment and policies. To fill this gap, health care facilities should supplement purchased training programs with specific training in organizational policies and procedures, emergency action plans, communication, facility risk assessment, and employee post-incident debriefing and monitoring. Critical to success is a dedicated program manager who understands risk assessment, facility clinical operations, and program management and evaluation.

  7. 38 CFR 41.525 - Criteria for Federal program risk.

    Science.gov (United States)

    2010-07-01

    ... control structures may have higher risk. When assessing risk in a large single audit, the auditor shall... also indicate risk. (2) Prior audit findings would indicate higher risk, particularly when the... program risk. 41.525 Section 41.525 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS...

  8. Personal digital assistants are comparable to traditional diaries for dietary self-monitoring during a weight loss program.

    Science.gov (United States)

    Yon, Bethany A; Johnson, Rachel K; Harvey-Berino, Jean; Gold, Beth Casey; Howard, Alan B

    2007-04-01

    Dietary self-monitoring is considered the core of behavioral weight control programs. As software for personal digital assistants (PDA) has become more available, this study investigated whether the use of a PDA would improve dietary self-monitoring frequency and subsequent weight loss over the use of traditional paper diaries. One-hundred-seventy-six adults (BMI 25-39.9) participated in a 6-month behavioral weight control program. Treatment subjects (n = 61) were provided with a PalmZire 21 with Calorie King's Diet Diary software installed. Their self-monitoring habits and weight loss were compared with the results from a previous program (n = 115) which followed the same protocol using paper diaries for self-monitoring. No significant differences in weight loss or dietary self-monitoring were found. More frequent self-monitoring correlated with weight loss in both groups (pself-monitoring that is fitting to their lifestyle and skills.

  9. Comparison of environmental radiation monitoring programs in China and the United States

    International Nuclear Information System (INIS)

    Ren Tianshan; Xu Cuihua; Shang Bing; Zhu Changshou; Sears, R.; Griggs, J.; Leed, H.N.; Wolbarst, A.

    2007-01-01

    Objective: It hopes that an awareness of the similarities and differences of China's and USA's programs will prove to be helpful to monitoring networks in their evolving and developing, and possibly to others as well. Methods: Based on the analyses of the sample collection, radionuclides analyses and data dissemination of NRCMS, ERAMS and EML's global network, the similarities and differences of the networks are characterized. Results: ERAMS and NRCMS have more similarities in responsibility, objectives and sampling components. The differences are mainly in the scope and size of each program. EML's global network represents the most extensive and comprehensive global network of its kind in the world for surface air radionuclides monitoring. Conclusions: As compared with EML's global network program, NRCMS and ERAMS has more similarities than differences. (authors)

  10. Results of Occupational Monitoring Program in Technologic Navy Center in Sao Paulo

    International Nuclear Information System (INIS)

    Perez, Clarice F.A.; Bitelli, Ricardo D.; Oliveira, Rodemir

    2013-01-01

    The CTMSP, Centro Tecnologico da Marinha em Sao Paulo, is a nuclear research Center located in the State of Sao Paulo. CTMSP headquarters is placed at the Campus of the University of Sao Paulo. Most of CTMSP nuclear facilities are at the Centro Experimental Aramar (CEA), located 120 km northwest from the Capital city of Sao Paulo. CTMSP has two major nuclear programs. One is the development of a PWR reactor for naval propulsion, and the other is associated with the front end fuel cycle technology comprising enrichment, conversion and reconversion. These activities require an extensive area monitoring program. This paper presents the results of this program covering the years of 2003 to 2011. The results include surface monitoring, dose rates and uranium concentrations in the air. (author)

  11. Linking Indices for Biodiversity Monitoring to Extinction Risk Theory

    Science.gov (United States)

    Mccarthy, Michael A; Moore, Alana L; Krauss, Jochen; Morgan, John W; Clements, Christopher F

    2014-01-01

    Biodiversity indices often combine data from different species when used in monitoring programs. Heuristic properties can suggest preferred indices, but we lack objective ways to discriminate between indices with similar heuristics. Biodiversity indices can be evaluated by determining how well they reflect management objectives that a monitoring program aims to support. For example, the Convention on Biological Diversity requires reporting about extinction rates, so simple indices that reflect extinction risk would be valuable. We developed 3 biodiversity indices that are based on simple models of population viability that relate extinction risk to abundance. We based the first index on the geometric mean abundance of species and the second on a more general power mean. In a third index, we integrated the geometric mean abundance and trend. These indices require the same data as previous indices, but they also relate directly to extinction risk. Field data for butterflies and woodland plants and experimental studies of protozoan communities show that the indices correlate with local extinction rates. Applying the index based on the geometric mean to global data on changes in avian abundance suggested that the average extinction probability of birds has increased approximately 1% from 1970 to 2009. Conectando Índices para el Monitoreo de la Biodiversidad con la Teoría de Riesgo de Extinción Resumen Los índices de biodiversidad combinan frecuentemente los datos de diferentes especies cuando se usan en los programas de monitoreo. Las propiedades heurísticas pueden sugerir índices preferidos, pero carecemos de medios objetivos para discriminar a los índices con propiedades heurísticas similares. Los índices de biodiversidad pueden evaluarse al determinar qué tan bien reflejan los objetivos de manejo que un programa de monitoreo busca apoyar. Por ejemplo, la Convención sobre la Diversidad Biológica requiere reportar las tasas de extinción, así que los

  12. Pharmaceuticals in tap water: human health risk assessment and proposed monitoring framework in China.

    Science.gov (United States)

    Leung, Ho Wing; Jin, Ling; Wei, Si; Tsui, Mirabelle Mei Po; Zhou, Bingsheng; Jiao, Liping; Cheung, Pak Chuen; Chun, Yiu Kan; Murphy, Margaret Burkhardt; Lam, Paul Kwan Sing

    2013-07-01

    Pharmaceuticals are known to contaminate tap water worldwide, but the relevant human health risks have not been assessed in China. We monitored 32 pharmaceuticals in Chinese tap water and evaluated the life-long human health risks of exposure in order to provide information for future prioritization and risk management. We analyzed samples (n = 113) from 13 cities and compared detected concentrations with existing or newly-derived safety levels for assessing risk quotients (RQs) at different life stages, excluding the prenatal stage. We detected 17 pharmaceuticals in 89% of samples, with most detectable concentrations (92%) at risk levels, but 4 (i.e., dimetridazole, thiamphenicol, sulfamethazine, and clarithromycin) were found to have at least one life-stage RQ ≥ 0.01, especially for the infant and child life stages, and should be considered of high priority for management. We propose an indicator-based monitoring framework for providing information for source identification, water treatment effectiveness, and water safety management in China. Chinese tap water is an additional route of human exposure to pharmaceuticals, particularly for dimetridazole, although the risk to human health is low based on current toxicity data. Pharmaceutical detection and application of the proposed monitoring framework can be used for water source protection and risk management in China and elsewhere.

  13. The pre-operational monitoring - how useful are recommendations of international organizations and various national programs

    International Nuclear Information System (INIS)

    Mihailovic, M.

    1980-01-01

    National legislation and the preoperational monitoring program around Nuclear Power Plant Krsko are described. The usefulness of international recommendations and various national preoperational monitoring programs is examined. Modifications are described which were introduced with the aim of identifying the site specific critical exposure pathways. The role of qualified and experienced experts is discussed. (H.K.)

  14. Monitoring people at risk of drinking by a rapid urinary ethyl glucuronide test

    Directory of Open Access Journals (Sweden)

    Fucci Nadia

    2017-12-01

    Full Text Available Alcohol and illicit drug abuse are major public health problems worldwide. Since alcohol is the predominant substance of choice in polydrug abusers, monitoring its use, along with urinary drug screening in patients in rehabilitation programs, appeared to be crucial in identifying patients at risk of alcohol disorders leading to impaired quality of life. Ethyl β-D-6-glucuronide, a non-oxidative, non-volatile, stable and minor direct ethanol metabolite, has a 6h to 4 day window of detection in urine after the last alcohol intake. Each of the 119 subjects (85 males, 34 females registered with the Public Health Service for Drug Dependence Treatment provided a urine sample for ethylglucoronide (EtG determination in an immunochemical test with a 500 ng/ml cutoff. All results were evaluated with confirmation criteria of a fully validated gas chromatography/mass spectrometry assay. The diagnostic performance of the EtG immunochemical test was assessed using Receiver Operating Characteristic Curve analysis. The immunochemical test specificity was 100% for EtG urinary values above 500 ng/ml. No false positive results were found. With levels below 500 ng/ml, 12% of the samples were classified as negative. The average consumption of the incorrectly classified subjects was 171 ng/ml, with a misclassification error of 6.5% to 18.5%. High agreement between EtG as determined in an immunochemical test and gas chromatography/mass spectrometry, suggests that the rapid EtG test is a reliable, cost-effective alcohol monitoring assay for patient management in many non-forensic settings, such as drug rehabilitation programs.

  15. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    International Nuclear Information System (INIS)

    Kszos, L.A.; Adams, S.M.; Ashwood, T.L.; Blaylock, B.G.; Greeley, M.S.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Hinzman, R.L.; Shoemaker, B.A.

    1993-04-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP is based on results of biological monitoring conducted from 1986 to 1992 and discussions held on November 12, 1992, between staff of Martin Marietta Energy Systems, Inc. (Oak Ridge National Laboratory and the K-25 Site), and the Tennessee Department of Environment and Conservation, Department of Energy Oversight Division. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions

  16. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Adams, S.M.; Ashwood, T.L.; Blaylock, B.G.; Greeley, M.S.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R. (Oak Ridge National Lab., TN (United States)); Hinzman, R.L. (Oak Ridge Research Inst., TN (United States)); Shoemaker, B.A. (Oak Ridge K-25 Site, TN (United States))

    1993-04-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP is based on results of biological monitoring conducted from 1986 to 1992 and discussions held on November 12, 1992, between staff of Martin Marietta Energy Systems, Inc. (Oak Ridge National Laboratory and the K-25 Site), and the Tennessee Department of Environment and Conservation, Department of Energy Oversight Division. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions.

  17. Monitoring program design recommendations for uranium mining communities

    International Nuclear Information System (INIS)

    1978-10-01

    Environmental radiological monitoring requirements and their rationale have been developed for operating uranium mine/mill sites including the pre-operational phase, and for non-operating tailings areas, in order to assess the radiological impact on the environment and follow long-term trends. These recommendations have been based on a review of regulatory standards, sources and nature of releases from mines, mills and tailings, and environmental pathway analysis. Media and measurements considered in the routine on-going programs include airborne radon, airborne particulates, external radiation, terrestrial biota, surface water, drinking water, ground water, fish and sediment. Program implementation guides are provided. An overview of sampling and field technique and specific recommendations have been made. (auth)

  18. Computer software program for monitoring the availability of systems and components of electric power generating systems

    International Nuclear Information System (INIS)

    Petersen, T.A.; Hilsmeier, T.A.; Kapinus, D.M.

    1994-01-01

    As availabilities of electric power generating stations systems and components become more and more important from a financial, personnel safety, and regulatory requirements standpoint, it is evident that a comprehensive, yet simple and user-friendly program for system and component tracking and monitoring is needed to assist in effectively managing the large volume of systems and components with their large numbers of associated maintenance/availability records. A user-friendly computer software program for system and component availability monitoring has been developed that calculates, displays and monitors selected component and system availabilities. This is a Windows trademark based (Graphical User Interface) program that utilizes a system flow diagram for the data input screen which also provides a visual representation of availability values and limits for the individual components and associated systems. This program can be customized to the user's plant-specific system and component selections and configurations. As will be discussed herein, this software program is well suited for availability monitoring and ultimately providing valuable information for improving plant performance and reducing operating costs

  19. Monitoring program of surrounding of the NPP SE-EBO

    International Nuclear Information System (INIS)

    Dobis, L.; Kostial, J.

    1997-01-01

    The paper dealt with monitoring program of radiation control of surrounding of the NPP Bohunice, which has the aim: (1) to ensure the control of influence of work of the NPP Bohunice on the environment in their surrounding; (2) to ensure the back-ground for regular brief of control and supervisory organs about condition of the environment in surrounding of the NPP Bohunice; (3) to maintain the expected technical level of control of the NPP Bohunice and to exploit optimally the technical means; (4) to solicit permanently the data about the radioactivity of environment in surrounding of the NPP Bohunice for forming of files of the data; (5) to exploit purposefully the technical equipment, technical workers and to maintain their in permanent emergency and technical eligibility for the case of the breakdown; (6) to obtain permanently the files of the values for qualification of the reference levels. This program of monitoring includes the radiation control of surrounding of the NPP Bohunice, in the time of normal work of power-station's blocks, inclusively of all types of trouble-shooting and repairer works in surrounding of the NPP Bohunice, up to distance 20 km from power-station. The monitoring includes: outlets from the NPP Bohunice, monitoring of radiation characteristics in surrounding of the NPP Bohunice, (aerosols, fall-outs, soil), the links of food chains: (grass and fodder, milk, agriculture products), hydrosphere in surrounding (surface waters, drink water, bores of radiation control in complex of the NPP Bohunice, components of the hydrosphere), measurement of radiation from external sources (measurement of the dose rates, measurement of the doses [sk

  20. Monitoring and risk assessment of pesticides in irrigation systems in Debra Zeit, Ethiopia.

    NARCIS (Netherlands)

    Teklu, Berhan M.; Adriaanse, Pauline; Brink, Van den Paul J.

    2016-01-01

    Since Ethiopia is going through a rapid transformation of its agricultural sector, we assessed the human health and environmental risks due to the past use of organochlorine pesticides (OCPs) as well as the risks of the current pesticide use by farmers. A monitoring programme and risk assessment

  1. Fetal programming of children's obesity risk.

    Science.gov (United States)

    Stout, Stephanie A; Espel, Emma V; Sandman, Curt A; Glynn, Laura M; Davis, Elysia Poggi

    2015-03-01

    Childhood obesity affects nearly 17% of children and adolescents in the United States. Increasing evidence indicates that prenatal maternal stress signals influence fetal growth, child obesity, and metabolic risk. Children exhibiting catch-up growth, a rapid and dramatic increase in body size, within the first two years of life are also at an increased risk for developing metabolic disorder and obesity. We evaluate the potential role of the maternal hypothalamic-pituitary-adrenal (HPA) and placental axis in programming risk for child obesity. This prospective longitudinal study measured placental corticotropin-releasing hormone (pCRH) and maternal plasma cortisol at 15, 19, 25, 30, and 37 gestational weeks and collected child body mass index (BMI) at birth, 3, 6, 12, and 24 months. Participants included 246 mothers and their healthy children born full term. Each child's BMI percentile (BMIP) was determined using World Health Organization (WHO) standards based on age and sex. Child BMIP profiles from birth to two years of age were characterized using general growth mixture modeling (GGMM). We evaluated whether fetal exposure to placental CRH and maternal cortisol are associated with BMIP profiles. Placental CRH at 30 gestational weeks was highly associated with both BMIP (pfetal programming of obesity risk. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. Ecological Monitoring and Compliance Program Fiscal Year 2000 Report

    Energy Technology Data Exchange (ETDEWEB)

    Wills, C.A.

    2000-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were in desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition

  3. Area monitoring dosimeter program for the Pacific Northwest National Laboratory: Results for CY 1997

    International Nuclear Information System (INIS)

    Bivins, S.R.; Stoetzel, G.A.

    1998-07-01

    In January 1993, Pacific Northwest National Laboratory (PNNL) established an area monitoring dosimeter program in accordance with Article 514 of the US Department of Energy (DOE) Radiological Control Manual (RCM). The purpose of the program was to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with 10 CFR Part 835.402 (a) (1)--(3) and Article 511.1 of the RCM, personnel dosimetry shall be provided to (1) radiological workers who are likely to receive at least 100 mrem annually, and (2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results for calendar years (CY) 1993--1996 confirmed that personnel dosimetry was not needed for individuals located in areas monitored by the program. A total of 93 area thermoluminescent dosimeters (TLDs) were placed in PNNL facilities during CY 1997. The TLDs were exchanged and analyzed quarterly. All routine area monitoring TLD results were less than 50 mrem annually after correcting for worker occupancy. The results support the conclusions that personnel dosimeters are not necessary for staff, declared pregnant workers, minors, or members of the public in these monitored areas

  4. Area Monitoring Dosimeter Program for the Pacific Northwest National Laboratory: Results for CY 1998

    International Nuclear Information System (INIS)

    GA Stoetzel; SR Bivins

    1999-01-01

    In January 1993, Pacific Northwest National Laboratory (PNNL) established an area monitoring dosimeter program in accordance with Article 514 of the Department of Energy (DOE) Radiological Control Manual (RCM). The purpose of the program was to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with 10 CFR Part 835.402 (a)(1)-(4) and Article 511.1 of the RCM, personnel dosimetry shall be provided to (1) radiological workers who are likely to receive at least 100 mrem annually and (2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results for calendar years 1993-1997 confirmed that personnel dosimetry was not needed for individuals located in areas monitored by the program. A total of 97 area thermoluminescent dosimeters (TLDs) were placed in PNNL facilities during calendar year 1998. The TLDs were exchanged and analyzed quarterly. All routine area monitoring TLD results were less than 50 mrem annually after correcting for worker occupancy. The results support the conclusion that personnel dosimeters are not necessary for staff, declared pregnant workers, minors, or members of the public in these monitored areas

  5. 40 CFR 52.430 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Photochemical Assessment Monitoring Stations (PAMS) Program. 52.430 Section 52.430 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Natural Resources & Environmental Control submitted a plan for the establishment and implementation of a...

  6. Environmental monitoring program for Itataia industrial complex before operational phase

    International Nuclear Information System (INIS)

    Condessa, M.L.M.B.

    1982-01-01

    This environmental monitoring program aims to characterize the environment in adjacent area of Itataia Industrial Complex. The places and frequencies of samples and measurements, as well as analysis and parameters to be measured in each type of samples are presented. (C.M.) [pt

  7. 40 CFR 52.480 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... of Columbia's Department of Consumer and Regulatory Affairs submitted a plan for the establishment... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Photochemical Assessment Monitoring Stations (PAMS) Program. 52.480 Section 52.480 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  8. 25 CFR 36.51 - Standard XVIII-Office of Indian Education Programs and Agency monitoring and evaluation...

    Science.gov (United States)

    2010-04-01

    ... XVIII—Office of Indian Education Programs and Agency monitoring and evaluation responsibilities. (a) The... 25 Indians 1 2010-04-01 2010-04-01 false Standard XVIII-Office of Indian Education Programs and Agency monitoring and evaluation responsibilities. 36.51 Section 36.51 Indians BUREAU OF INDIAN AFFAIRS...

  9. Design and analysis of environmental monitoring programs

    DEFF Research Database (Denmark)

    Lophaven, Søren Nymand

    2005-01-01

    This thesis describes statistical methods for modelling space-time phenomena. The methods were applied to data from the Danish marine monitoring program in the Kattegat, measured in the five-year period 1993-1997. The proposed model approaches are characterised as relatively simple methods, which...... into account. Thus, it serves as a compromise between existing methods. The space-time model approaches and geostatistical design methods used in this thesis are generally applicable, i.e. with minor modifications they could equally well be applied within areas such as soil and air pollution. In Danish: Denne...

  10. Application of online chemistry monitoring programs and technology

    International Nuclear Information System (INIS)

    Perkins, D.; Choi, S.; Haas, C.

    2010-01-01

    To fully understand the impact of chemistry changes, several plant parameters must be considered and reviewed with actual chemistry analyses and compared to plant operating parameters. In some cases, this requires the ability to rapidly correlate plant operational data with laboratory and chemistry data. An effective online monitoring system should be able to: Integrate and extract online data from the plant laboratory and operating information from various plant data sources continuously; Interrogate and extract laboratory data from manually entered data on predefined frequencies; Interact with multiple laboratories in multiple locations; Evaluate data against plant limits (calculated or static) and provide personnel with action level or notification of plant exceeding limits; and, Provide the ability to evaluate against a standard and site specific set of calculations. The nuclear power industry continues to refine and apply new technologies in an effort to notify operators of changes in chemical conditions, calculate complex high temperature results, and monitor system performance. EPRI developed software specifically focused on plant chemistry program optimization using power operation and shutdown data applied with plant equipment. This software evolved into the family of software referred to as EPRI ChemWorks™ applications. As technology changed and improved, the application of online monitoring was essential for plant personnel working offsite. These changes in technology prompted EPRI to the development of SMART ChemWorks™ using the EPRI ChemWorks™ plant chemistry simulator and MULTEQ applications as the backbone for these simulations and calculations. SMART ChemWorks™ is an online monitoring system that queries plant databases and continuously monitors plant and chemistry parameters. The system uses a real-time intelligence engine to perform virtual sensing, identify normal and off-normal conditions and compare in-line instrument output to grab

  11. The Savannah River Site`s groundwater monitoring program. Third quarter 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-05-06

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.

  12. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site

  13. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  14. The Rendezvous Monitoring Display Capabilities of the Rendezvous and Proximity Operations Program

    Science.gov (United States)

    Brazzel, Jack; Spehar, Pete; Clark, Fred; Foster, Chris; Eldridge, Erin

    2013-01-01

    The Rendezvous and Proximity Operations Program (RPOP) is a laptop computer- based relative navigation tool and piloting aid that was developed during the Space Shuttle program. RPOP displays a graphical representation of the relative motion between the target and chaser vehicles in a rendezvous, proximity operations and capture scenario. After being used in over 60 Shuttle rendezvous missions, some of the RPOP display concepts have become recognized as a minimum standard for cockpit displays for monitoring the rendezvous task. To support International Space Station (ISS) based crews in monitoring incoming visiting vehicles, RPOP has been modified to allow crews to compare the Cygnus visiting vehicle s onboard navigated state to processed range measurements from an ISS-based, crew-operated Hand Held Lidar sensor. This paper will discuss the display concepts of RPOP that have proven useful in performing and monitoring rendezvous and proximity operations.

  15. Conservation and management applications of the REEF volunteer fish monitoring program.

    Science.gov (United States)

    Pattengill-Semmens, Christy V; Semmens, Brice X

    2003-01-01

    The REEF Fish Survey Project is a volunteer fish monitoring program developed by the Reef Environmental Education Foundation (REEF). REEF volunteers collect fish distribution and abundance data using a standardized visual method during regular diving and snorkeling activities. Survey data are recorded on preprinted data sheets that are returned to REEF and optically digitized. Data are housed in a publicly accessible database on REEF's Web site (http://www.reef.org). Since the project's inception in 1993, over 40,000 surveys have been conducted in the coastal waters of North America, tropical western Atlantic, Gulf of California and Hawaii. The Fish Survey Project has been incorporated into existing monitoring programs through partnerships with government agencies, scientists, conservation organizations, and private institutions. REEF's partners benefit from the educational value and increased stewardship resulting from volunteer data collection. Applications of the data include an evaluation of fish/habitat interactions in the Florida Keys National Marine Sanctuary, the development of a multi-species trend analysis method to identify sites of management concern, assessment of the current distribution of species, status reports on fish assemblages of marine parks, and the evaluation of no-take zones in the Florida Keys. REEF's collaboration with a variety of partners, combined with the Fish Survey Project's standardized census method and database management system, has resulted in a successful citizen science monitoring program.

  16. The passive seismic aftershock Monitoring system: testing program and preliminary results

    International Nuclear Information System (INIS)

    Mokhtari, M.

    2005-01-01

    The paper is dedicated to testing program (phase of the passive seismic aftershock monitoring system with RefTek equipment (Refraction Technology, Inc., USA) for On-Site Inspection purposes that was carried out near Vienna International Centre in 2000. Equipment and applied software are described. Testing results were analyzed; in particular, least needs in maintenance personnel during operation. Development perspectives of passive seismic aftershock monitoring system for On-Site Inspection have been discussed. (author)

  17. Management of women at high risk of hereditary breast cancer in the Veneto Regional Program for Prevention.

    Science.gov (United States)

    Del Sole, Annamaria; Cinquetti, Sandro; Fedato, Chiara; Montagna, Marco; Russo, Francesca; Sbrogiò, Luca Gino; Zorzi, Manuel

    2015-01-01

    Today it is well-known that high risk of genetic breast cancer concerns a very limited part of the population: no more than 2-3 women are affected every thousand and this condition as a whole accounts for no more than 3%-5% of all breast cancers. Following the directions contained in the 2014-2018 National Prevention Plan, Veneto's 2014-2018 Regional Program of Prevention (PRP), approved by Regional Council Resolution (DGR) No. 749 of 14.5.2015, consolidation of a pathway of diagnosis, observation, and prophylaxis for women at high risk of hereditary breast carcinoma is thus proposed. The principal activities of this policy will be the following: creation of a regional working group, survey of currently existing pathways for the identification of women at risk of hereditary breast cancer and adoption of the same, approval and consolidation of a structured regional pathway for women at high risk of hereditary breast and/or ovarian cancer, from paths of oncogenetic consultation and genetic testing to management of disease risk. Subsequent to the recognition of the pathway of diagnosis, observation, and prophylaxis for women at high risk of hereditary breast carcinoma, the Veneto region undertakes to develop a co-ordinated program of information and training on this pathway directed at the population and healthcare workers. It is firmly hoped that with the inclusion of a program for the management of women at high risk of hereditary breast cancer within the Veneto PRP this topic may become more defined and structured in terms of sustainability, integration with the existing regional networks (mammography network, Breast Unit), contrasting inequality, monitoring and evaluation, in this way pursuing the objectives of a reduction of cause-specific mortality and improvement of quality of life.

  18. Can wide consultation help with setting priorities for large-scale biodiversity monitoring programs?

    Directory of Open Access Journals (Sweden)

    Frédéric Boivin

    Full Text Available Climate and other global change phenomena affecting biodiversity require monitoring to track ecosystem changes and guide policy and management actions. Designing a biodiversity monitoring program is a difficult task that requires making decisions that often lack consensus due to budgetary constrains. As monitoring programs require long-term investment, they also require strong and continuing support from all interested parties. As such, stakeholder consultation is key to identify priorities and make sound design decisions that have as much support as possible. Here, we present the results of a consultation conducted to serve as an aid for designing a large-scale biodiversity monitoring program for the province of Québec (Canada. The consultation took the form of a survey with 13 discrete choices involving tradeoffs in respect to design priorities and 10 demographic questions (e.g., age, profession. The survey was sent to thousands of individuals having expected interests and knowledge about biodiversity and was completed by 621 participants. Overall, consensuses were few and it appeared difficult to create a design fulfilling the priorities of the majority. Most participants wanted 1 a monitoring design covering the entire territory and focusing on natural habitats; 2 a focus on species related to ecosystem services, on threatened and on invasive species. The only demographic characteristic that was related to the type of prioritization was the declared level of knowledge in biodiversity (null to high, but even then the influence was quite small.

  19. Can wide consultation help with setting priorities for large-scale biodiversity monitoring programs?

    Science.gov (United States)

    Boivin, Frédéric; Simard, Anouk; Peres-Neto, Pedro

    2014-01-01

    Climate and other global change phenomena affecting biodiversity require monitoring to track ecosystem changes and guide policy and management actions. Designing a biodiversity monitoring program is a difficult task that requires making decisions that often lack consensus due to budgetary constrains. As monitoring programs require long-term investment, they also require strong and continuing support from all interested parties. As such, stakeholder consultation is key to identify priorities and make sound design decisions that have as much support as possible. Here, we present the results of a consultation conducted to serve as an aid for designing a large-scale biodiversity monitoring program for the province of Québec (Canada). The consultation took the form of a survey with 13 discrete choices involving tradeoffs in respect to design priorities and 10 demographic questions (e.g., age, profession). The survey was sent to thousands of individuals having expected interests and knowledge about biodiversity and was completed by 621 participants. Overall, consensuses were few and it appeared difficult to create a design fulfilling the priorities of the majority. Most participants wanted 1) a monitoring design covering the entire territory and focusing on natural habitats; 2) a focus on species related to ecosystem services, on threatened and on invasive species. The only demographic characteristic that was related to the type of prioritization was the declared level of knowledge in biodiversity (null to high), but even then the influence was quite small.

  20. Integrating an automated activity monitor into an artificial insemination program and the associated risk factors affecting reproductive performance of dairy cows.

    Science.gov (United States)

    Burnett, Tracy A; Madureira, Augusto M L; Silper, Bruna F; Fernandes, A C C; Cerri, Ronaldo L A

    2017-06-01

    The aim of this study was to compare 2 reproductive programs for the management of first postpartum artificial insemination (AI) based on activity monitors and timed AI, as well as to determine the effect of health-related factors on detection and expression of estrus. Lactating Holstein cows (n = 918) from 2 commercial farms were enrolled. Estrous cycles of all cows were presynchronized with 2 injections of PGF 2α administered 2 wk apart. Treatments were (1) first insemination performed by timed AI (TAI) and (2) first insemination based upon the detection of estrus by activity monitors (ACT; Heatime, SCR Engineering, Netanya, Israel) after the presynchronization, whereas cows not inseminated by the detection of estrus were enrolled in the Ovsynch protocol. Body condition score (BCS; scale 1 to 5), hock score (scale: 1 to 4), gait score (scale: 1 to 4), and corpus luteum presence detected by ovarian ultrasonography were recorded twice during the presynchronization. On the ACT treatment, 50.5% of cows were inseminated based on detected estrus, whereas 83.2% of the cows on the TAI treatment were inseminated appropriately after the timed AI protocol. Pregnancy per AI did not differ by treatment (30.8 vs. 33.5% for ACT and TAI, respectively). Success of pregnancy was affected by parity, cyclicity, BCS, milk production, and a tendency for leg health. In addition, treatment × cyclicity and treatment × parity interactions were found to affect pregnancy success, where anovulatory cows and older cows had compromised pregnancy outcomes on the ACT treatment but not on the TAI treatment. Factors affecting pregnancy outcomes varied among farms. Hazard of pregnancy by 300 DIM was affected by farm, parity, BCS, a treatment × cyclicity interaction, and a tendency for an interaction between leg health and farm. Detection of estrus was affected by farm, parity, cyclicity, and leg health, but not BCS or milk production. Expression of estrus was compromised in anovular and older

  1. Concentrations of Elements in Hellbender Blood and Fish Fillets from the Missouri Department of Conservation Monitoring Programs

    Science.gov (United States)

    May, Thomas W.; Walther, Mike J.; Brumbaugh, William G.

    2007-01-01

    This report presents the results of contaminant monitoring surveys conducted annually by the Missouri Department of Conservation to examine the levels of selected elemental contaminants in hellbender (Cryptobranchus alleganiensis) blood and fish. Catfish (Ictalurus furcatus, Ictalurus punctatus, Pylodictis olivaris), redhorse (Moxostoma anisorum, Moxostoma erythrurum), bass (Micropterus salmoides, Micropterus punctulatus, Micropterus Lacepede, Ambloplites rupestris), walleye (Sander vitreus), and sunfish (Lepomis megalotis) were collected from 17 sites as part of the Department's General Contaminant Monitoring Program. Bluegill (Lepomis macrochirus) and other sunfish (Lepomis megalotis, Lepomis cyanellus) were collected from 18 sites as part of the Department's Resource Assessment and Monitoring Program. Blood from hellbenders was collected from seven sites as part of the Department's Hellbender Monitoring Program.

  2. Regional monitoring programs in the United States: Synthesis of four case studies from Pacific, Atlantic, and Gulf Coasts

    Science.gov (United States)

    Tango, Peter J.; Schiff, K.; Trowbridge, P.R.; Sherwood, E.T.; Batiuk, R.A.

    2016-01-01

    Water quality monitoring is a cornerstone of environmental protection and ambient monitoring provides managers with the critical data they need to take informed action. Unlike site-specific monitoring that is at the heart of regulatory permit compliance, regional monitoring can provide an integrated, holistic view of the environment, allowing managers to obtain a more complete picture of natural variability and cumulative impacts, and more effectively prioritize management actions. By reviewing four long-standing regional monitoring programs that cover portions of all three coasts in the United States – Chesapeake Bay, Tampa Bay, Southern California Bight, and San Francisco Bay – important insights can be gleaned about the benefits that regional monitoring provides to managers. These insights include the underlying reasons that make regional monitoring programs successful, the challenges to maintain relevance and viability in the face of ever-changing technology, competing demands and shifting management priorities. The lessons learned can help other managers achieve similar successes as they seek to establish and reinvigorate their own monitoring programs.

  3. Radiation risk education program - local

    International Nuclear Information System (INIS)

    Bushong, S.C.; Archer, B.R.

    1980-01-01

    This article points out the lack of knowledge by the general public and medical profession concerning the true risks of radiation exposure. The author describes an educational program which can be implemented at the local level to overcome this deficiency. The public must understand the enormous extent of benefit derived from radiation applications in our society

  4. 2008 report on the Monitoring of good practices programs and independence for electricity and natural gas system operators

    International Nuclear Information System (INIS)

    2009-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 4. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2008. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2008 and audits carried out by the CRE services in these companies in 2008

  5. User's guide for PRISM (Plant Risk Status Information Management System) Arkansas Nuclear One-Unit 1: Volume 1, Program for inspectors

    International Nuclear Information System (INIS)

    Campbell, D.J.; Guthrie, V.H.; Kirchner, J.R.; Kirkman, J.Q.; Paula, H.M.; Ellison, B.C.; Dycus, F.M.; Farquharson, J.A.; Flanagan, G.F.

    1988-03-01

    This user's guide is a two-volume document designed to teach NRC inspectors and NRC regulators how to access probabilistic risk assessment information from the two Plant Risk Status Information Management System (PRISIM) programs developed for Arkansas Nuclear One -- Unit One (ANO-1). This document, Volume 1, describes how the PRA information available in Version 1.0 of PRISIM is useful for planning inspections. Using PRISIM, inspectors can quickly access PRA information and use that information to update risk analysis results, reflecting a plant's status at any particular time. Both volumes are stand-alone documents, and each volume presents several sample computer sessions designed to lead the user through a variety of PRISIM applications used to obtain PRA-related information for monitoring and controlling plant risk

  6. Program for Volcanic Risk Reduction in the Americas: Translation of Science into Policy and Practice

    Science.gov (United States)

    Mangan, Margaret; Pierson, Thomas; Wilkinson, Stuart; Westby, Elizabeth; Driedger, Carolyn; Ewert, John

    2016-04-01

    In 2013, the United States Geological Survey (USGS) and the U.S. Agency for International Development/Office of Foreign Disaster Assistance (USAID/OFDA) inaugurated Volcanic Risk Reduction in the Americas, a program that brings together binational delegations of scientists, civil authorities, and emergency response managers to discuss the challenges of integrating volcano science into crisis response and risk reduction practices. During reciprocal visits, delegations tour areas impacted by volcanic unrest and/or eruption, meet with affected communities, and exchange insights and best practices. The 2013 exchange focused on hazards at Mount Rainier (Washington, USA) and Nevado del Ruiz (Caldas/Tolima, Colombia). Both of these volcanoes are highly susceptible to large volcanic mudflows (lahars). The Colombia-USA exchange allowed participants to share insights on lahar warning systems, self-evacuation planning, and effective education programs for at-risk communities. [See Driedger and Ewert (2015) Abstract 76171 presented at 2015 Fall AGU, San Francisco, Calif., Dec 14-18]. The second exchange, in 2015, took place between the USA and Chile, focusing on the Long Valley volcanic region (California, USA) and Chaitén volcano (Lagos, Chile) - both are centers of rhyolite volcanism. The high viscosity of rhyolite magma can cause explosive eruptions with widespread destruction. The rare but catastrophic "super eruptions" of the world have largely been the result of rhyolite volcanism. Chaitén produced the world's first explosive rhyolite eruption in the age of modern volcano monitoring in 2008-2009. Rhyolite eruptions of similar scale and style have occurred frequently in the Long Valley volcanic region, most recently about 600 years ago. The explosivity and relative rarity of rhyolite eruptions create unique challenges to risk reduction efforts. The recent Chaitén eruption was unexpected - little was known of Chaitén's eruptive history, and because of this, monitoring

  7. USGS Zebra Mussel Monitoring Program for north Texas

    Science.gov (United States)

    Churchill, Christopher J.; Baldys, Stanley

    2012-01-01

    The U.S. Geological Survey (USGS) Zebra Mussel Monitoring Program for north Texas provides early detection and monitoring of zebra mussels (Dreissena polymorpha) by using a holistic suite of detection methods. The program is designed to assess zebra mussel occurrence, distribution, and densities in north Texas waters by using four approaches: (1) SCUBA diving, (2) water-sample collection with plankton tow nets (followed by laboratory analyses), (3) artificial substrates, and (4) water-quality sampling. Data collected during this type of monitoring can assist rapid response efforts and can be used to quantify the economic and ecological effects of zebra mussels in the north Texas area. Monitoring under this program began in April 2010. The presence of large zebra mussel populations often causes undesirable economic and ecological effects, including damage to water-processing infrastructure and hydroelectric powerplants (with an estimated 10-year cost of $3.1 billion), displacement of native mussels, increases in concentrations of certain species of cyanobacteria, and increases in concentrations of geosmin (an organic compound that results in taste and odor issues in water). Since no large-scale, environmentally safe eradication method has been developed for zebra mussels, it is difficult to remove established populations. Broad physicochemical adaptability, prolific reproductive capacity, and rapid dispersal methods have enabled zebra mussels, within a period of about 20 years, to establish populations under differing environmental conditions across much of the eastern part of the United States. In Texas, the presence of zebra mussels was first confirmed in April 2009 in Lake Texoma in the Red River Basin along the Texas-Oklahoma border. They were most likely introduced into Lake Texoma through overland transport from an infested water body. Since then, the presence of zebra mussels has been reported in both the Red River and Washita River arms of Lake Texoma, in

  8. Benefits of a Biological Monitoring Program for Assessing Remediation Performance and Long-Term Stewardship - 12272

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, Mark [Oak Ridge National Laboratory, Oak Ridge, Tennessee 37831 (United States)

    2012-07-01

    The Biological Monitoring and Abatement Program (BMAP) is a long-running program that was designed to evaluate biological conditions and trends in waters downstream of Department of Energy (DOE) facilities in Oak Ridge, Tennessee. BMAP monitoring has focused on aquatic pathways from sources to biota, which is consistent with the sites' clean water regulatory focus and the overall cleanup strategy which divided remediation areas into watershed administrative units. Specific programmatic goals include evaluating operational and legacy impacts to nearby streams and the effectiveness of implemented remediation strategies at the sites. The program is characterized by consistent, long-term sampling and analysis methods in a multidisciplinary and quantitative framework. Quantitative sampling has shown conclusively that at most Oak Ridge stream sites, fish and aquatic macro-invertebrate communities have improved considerably since the 1980s. Monitoring of mercury and PCBs in fish has shown that remedial and abatement actions have also improved stream conditions, although in some cases biological monitoring suggests further actions are needed. Follow-up investigations have been implemented by BMAP to identify sources or causes, consistent with an adaptive management approach. Biological monitoring results to date have not only been used to assess regulatory compliance, but have provided additional benefits in helping address other components of the DOE's mission, including facility operations, natural resource, and scientific goals. As a result the program has become a key measure of long-term trends in environmental conditions and of high value to the Oak Ridge environmental management community, regulators, and the public. Some of the BMAP lessons learned may be of value in the design, implementation, and application of other long-term monitoring and stewardship programs, and assist environmental managers in the assessment and prediction of the effectiveness of

  9. Optimal Risk Reduction in the Railway Industry by Using Dynamic Programming

    OpenAIRE

    Michael Todinov; Eberechi Weli

    2013-01-01

    The paper suggests for the first time the use of dynamic programming techniques for optimal risk reduction in the railway industry. It is shown that by using the concept ‘amount of removed risk by a risk reduction option’, the problem related to optimal allocation of a fixed budget to achieve a maximum risk reduction in the railway industry can be reduced to an optimisation problem from dynamic programming. For n risk reduction options and size of the available risk reduction budget B (expres...

  10. Applicability of a generic monitoring program for radioactive waste burial grounds at Oak Ridge National Laboratory and Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1978-07-01

    Six burial grounds were evaluated at Oak Ridge to determine which would be most suitable for testing the generic monitoring approach, and two were selected. Burial Ground 4 was chosen because it is known to be leaking radioactivity and a monitoring program is desirable to determine the source, pattern and extent of the leakage. Burial Ground 6 was chosen because the most complete radiologic and geologic data is available and modern burial practices have been utilized at this site. At the Idaho National Engineering Laboratory (INEL) only one burial ground exists, the Radioactive Waste Management Complex (RWMC). The data available on the burial grounds are insufficient for an adequate understanding of radionuclide migration patterns and accordingly, inadequate for the design of reliable monitoring programs. It was decided, therefore, that preliminary monitoring programs should be designed in order to obtain additional data for a later implementation of reliable monitoring programs. The monitoring programs designed for ORNL consist primarily of the installation of surface water monitoring stations, the surveillance of trench sump wells, a test boring program to study subsurface geologic conditions, a ground water sampling program and the installation of instrumentation, specifically infiltrometers and evaporation pans, to develop data on site water balances. The program designed for the INEL burial ground includes installation of trench sumps, a ground water monitoring program, test borings to further define subsurface geohydrologic conditions and the installation of instrumentation to develop data on the site water balance. The estimated costs of implementing the recommended programs are about $420,820 for monitoring Burial Grounds 4 and 6 at Oak Ridge and $382,060 for monitoring the RWMC at INEL. 12 figures

  11. CNN's evaluation of the radiological monitoring special programs at the sites of nuclear installations

    International Nuclear Information System (INIS)

    Lareyne, O.; Marugan Tovar, I.; Martinez Moreno, M.; Sanz Alduan, M. T.

    2011-01-01

    In 2008, occurred in the Spanish plants various events related to the existence on the sites of the Spanish nuclear facilities or areas dotted with radioactive contamination outside the buildings, events that were reported to the Nuclear Safety Council (CSN) in accordance with the provisions of the regulation, as a result of the analysis of those events, the CSN issued in July 2008, a complementary technique INSTRUCTIONAL requiring the implementation of environmental monitoring programs in outdoor areas within sites nuclear tacilities. First, the CSN nuclear facilities referred to the programs and methodologies intended to perform such monitoring, and, in late 2009, reports of program results.

  12. Energy drink consumption and the perceived risk and disapproval of drugs: Monitoring the Future, 2010-2016.

    Science.gov (United States)

    Jackson, Dylan B; Leal, Wanda E

    2018-07-01

    Energy drinks have become quite popular in recent years among adolescents, prompting a wealth of recent research examining the potential deleterious consequences of energy drink consumption among youth. The present study adds to this body of work by exploring perceptions of risk and disapproval of soft and hard drugs among adolescents and whether such attitudes are predicted by patterns of energy drink/shot consumption. Data were derived from the seven most recent cohorts (2010-2016) of the Monitoring the Future (MTF) study, a nationally representative survey of U.S. youth. The significance of associations between energy drink/shot consumption and drug perceptions/attitudes was tested using logistic regression techniques employing adjustments for covariates and cohort-specific fixed effects. Energy drink/shot consumption was largely associated with significant increases in the odds of failing to perceive any risk of drug use and failing to disapprove of drug use among youths, regardless of whether attitudes concerning soft or hard drugs were examined. These associations were particularly robust in the case of habitual energy drink/shot consumers (relative to occasional consumers or abstainers). Additional efforts should be made to heighten awareness and education concerning the potential dangers of energy drink consumption among youth, particularly as it pertains to drug attitudes and diminished perceptions of substance use risk. Policies that minimize energy drink consumption among youth as well as programs that educate parents and teachers about the drug attitudes of youths who regularly consume energy drinks and promote active monitoring of these adolescents may be worthwhile. Copyright © 2018 Elsevier B.V. All rights reserved.

  13. 1985 Environmental Monitoring Program report for the Idaho National Engineering Laboratory site

    International Nuclear Information System (INIS)

    Hoff, D.L.; Chew, E.W.; Rope, S.K.

    1986-05-01

    The results of the various monitoring programs for 1985 indicated that radioactivity from the Idaho National Engineering Laboratory (INEL) Site operations could not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the Site. Although some radioactive materials were discharged during Site operations, concentrations and doses to the surrounding population were of no health consequence and were far less than State of Idaho and Federal health protection guidelines. This report describes the air, water, and foodstuff samples routinely collected at the INEL boundary locations and at locations distant from the INEL Site. It compares and evaluates the sample results, discussing implications, if any. Included for the first time this year are data from air and water samples routinely collected from onsite locations. The report also summarizes significant environmental activities at the INEL Site during 1985, nonradioactive and radioactive effluent monitoring at the Site, and the US Geological Survey (USGS) groundwater monitoring program

  14. 2005 Annual Synthesis Report, Pallid Sturgeon Population Assessment Program and Associated Fish Community Monitoring for the Missouri River

    Energy Technology Data Exchange (ETDEWEB)

    Oldenburg, Eric W.; Hanrahan, Timothy P.; Harnish, Ryan A.; Bellgraph, Brian J.; Duncan, Joanne P.; Allwardt, Craig H.

    2008-08-12

    Pallid sturgeon, Scaphirhynchus albus, have declined throughout the Missouri River since dam construction and inception of the Bank Stabilization and Navigation Project in 1912. Their decline likely is due to the loss and degradation of their natural habitat as a result of changes in the river’s structure and function, as well as the pallid sturgeon’s inability to adapt to these changes. The U. S. Army Corps of Engineers has been working with state and federal agencies to develop and conduct a Pallid Sturgeon Monitoring and Assessment Program (Program), with the goal of recovering pallid sturgeon populations. The Program has organized the monitoring and assessment efforts into distinct geographic segments, with state and federal resource management agencies possessing primary responsibility for one or more segment. To date, the results from annual monitoring have been reported for individual Program segments. However, monitoring results have not been summarized or evaluated for larger spatial scales, encompassing more than one Program segment. This report describes a summary conducted by the Pacific Northwest National Laboratory (PNNL) that synthesizes the 2005 sampling year monitoring results from individual segments.

  15. 2006 Annual Synthesis Report, Pallid Sturgeon Population Assessment Program and Associated Fish Community Monitoring for the Missouri River

    Energy Technology Data Exchange (ETDEWEB)

    Oldenburg, Eric W.; Hanrahan, Timothy P.; Harnish, Ryan A.; Bellgraph, Brian J.; Duncan, Joanne P.; Allwardt, Craig H.

    2008-08-12

    Pallid sturgeon, Scaphirhynchus albus, have declined throughout the Missouri River since dam construction and inception of the Bank Stabilization and Navigation Project in 1912. Their decline likely is due to the loss and degradation of their natural habitat as a result of changes in the river’s structure and function, as well as the pallid sturgeon’s inability to adapt to these changes. The U. S. Army Corps of Engineers has been working with state and federal agencies to develop and conduct a Pallid Sturgeon Monitoring and Assessment Program (Program), with the goal of recovering pallid sturgeon populations. The Program has organized the monitoring and assessment efforts into distinct geographic segments, with state and federal resource management agencies possessing primary responsibility for one or more segment. To date, the results from annual monitoring have been reported for individual Program segments. However, monitoring results have not been summarized or evaluated for larger spatial scales, encompassing more than one Program segment. This report describes a summary conducted by the Pacific Northwest National Laboratory (PNNL) that synthesizes the 2006 sampling year monitoring results from individual segments.

  16. Louisiana Barrier Island Comprehensive Monitoring (BICM) Program Summary Report: Data and Analyses 2006 through 2010

    Science.gov (United States)

    Kindinger, Jack G.; Buster, Noreen A.; Flocks, James G.; Bernier, Julie C.; Kulp, Mark A.

    2013-01-01

    The Barrier Island Comprehensive Monitoring (BICM) program was implemented under the Louisiana Coastal Area Science and Technology (LCA S&T) office as a component of the System Wide Assessment and Monitoring (SWAMP) program. The BICM project was developed by the State of Louisiana (Coastal Protection Restoration Authority [CPRA], formerly Department of Natural Resources [DNR]) to complement other Louisiana coastal monitoring programs such as the Coastwide Reference Monitoring System-Wetlands (CRMS-Wetlands) and was a collaborative research effort by CPRA, University of New Orleans (UNO), and the U.S. Geological Survey (USGS). The goal of the BICM program was to provide long-term data on the barrier islands of Louisiana that could be used to plan, design, evaluate, and maintain current and future barrier-island restoration projects. The BICM program used both historical and newly acquired (2006 to 2010) data to assess and monitor changes in the aerial and subaqueous extent of islands, habitat types, sediment texture and geotechnical properties, environmental processes, and vegetation composition. BICM datasets included aerial still and video photography (multiple time series) for shoreline positions, habitat mapping, and land loss; light detection and ranging (lidar) surveys for topographic elevations; single-beam and swath bathymetry; and sediment grab samples. Products produced using BICM data and analyses included (but were not limited to) storm-impact assessments, rate of shoreline and bathymetric change, shoreline-erosion and accretion maps, high-resolution elevation maps, coastal-shoreline and barrier-island habitat-classification maps, and coastal surficial-sediment characterization maps. Discussions in this report summarize the extensive data-collection efforts and present brief interpretive analyses for four coastal Louisiana geographic regions. In addition, several coastal-wide and topical themes were selected that integrate the data and analyses within a

  17. Knowledge-based software design for Defense-in-Depth risk monitor system and application for AP1000

    International Nuclear Information System (INIS)

    Ma Zhanguo; Yoshikawa, Hidekazu; Yang Ming; Nakagawa, Takashi

    2017-01-01

    As part of the new risk monitor system, the software for the plant Defense-in-Depth (DiD) risk monitor system was designed based on the state-transition and finite-state machine, and then the knowledge-based software was developed by object-oriented method utilizing the Unified Modeling Language (UML). Currently, there are mainly two functions in the developed plant DiD risk monitor software that are knowledge-base editor which is used to model the system in a hierarchical manner and the interaction simulator that simulates the interactions between the different actors in the model. In this paper, a model for playing its behavior is called an Actor which is modeled at the top level. The passive safety AP1000 power plant was studied and the small-break loss-of-coolant accident (SBLOCA) design basis accident transient is modeled using the plant DiD risk monitor software. Furthermore, the simulation result is shown for the interactions between the actors which are defined in the plant DiD risk monitor system as PLANT actor, OPERATOR actor, and SUPERVISOR actor. This paper shows that it is feasible to model the nuclear power plant knowledge base using the software modeling technique. The software can make the large knowledge base for the nuclear power plant with small effort. (author)

  18. Behavioral Monitoring of Sexual Offenders Against Children in Virtual Risk Situations: A Feasibility Study

    Directory of Open Access Journals (Sweden)

    Peter Fromberger

    2018-03-01

    Full Text Available The decision about unsupervised privileges for sexual offenders against children (SOC is one of the most difficult decisions for practitioners in forensic high-security hospitals. Facing the possible consequences of the decision for the society, a valid and reliable risk management of SOCs is essential. Some risk management approaches provide frameworks for the construction of relevant future risk situations. Due to ethical reasons, it is not possible to evaluate the validity of constructed risk situations in reality. The aim of the study was to test if behavioral monitoring of SOCs in high-immersive virtual risk situations provides additional information for risk management. Six SOCs and seven non-offender controls (NOC walked through three virtual risk situations, confronting the participant with a virtual child character. The participant had to choose between predefined answers representing approach or avoidance behavior. Frequency of chosen answers were analyzed in regards to knowledge of the participants about coping skills and coping skills focused during therapy. SOCs and NOCs behavior differed only in one risk scenario. Furthermore, SOCs showed in 89% of all cases a behavior not corresponding to their own belief about adequate behavior in comparable risk situations. In 62% of all cases, SOCs behaved not corresponding to coping skills they stated that therapists focused on during therapy. In 50% of all cases, SOCs behaved in correspondence to coping skills therapists stated that they focused on during therapy. Therapists predicted the behavior of SOCs in virtual risk situations incorrect in 25% of all cases. Thus, virtual risk scenarios provide the possibility for practitioners to monitor the behavior of SOCs and to test their decisions on unsupervised privileges without endangering the community. This may provide additional information for therapy progress. Further studies are necessary to evaluate the predictive and ecological validity

  19. Behavioral Monitoring of Sexual Offenders Against Children in Virtual Risk Situations: A Feasibility Study.

    Science.gov (United States)

    Fromberger, Peter; Meyer, Sabrina; Jordan, Kirsten; Müller, Jürgen L

    2018-01-01

    The decision about unsupervised privileges for sexual offenders against children (SOC) is one of the most difficult decisions for practitioners in forensic high-security hospitals. Facing the possible consequences of the decision for the society, a valid and reliable risk management of SOCs is essential. Some risk management approaches provide frameworks for the construction of relevant future risk situations. Due to ethical reasons, it is not possible to evaluate the validity of constructed risk situations in reality. The aim of the study was to test if behavioral monitoring of SOCs in high-immersive virtual risk situations provides additional information for risk management. Six SOCs and seven non-offender controls (NOC) walked through three virtual risk situations, confronting the participant with a virtual child character. The participant had to choose between predefined answers representing approach or avoidance behavior. Frequency of chosen answers were analyzed in regards to knowledge of the participants about coping skills and coping skills focused during therapy. SOCs and NOCs behavior differed only in one risk scenario. Furthermore, SOCs showed in 89% of all cases a behavior not corresponding to their own belief about adequate behavior in comparable risk situations. In 62% of all cases, SOCs behaved not corresponding to coping skills they stated that therapists focused on during therapy. In 50% of all cases, SOCs behaved in correspondence to coping skills therapists stated that they focused on during therapy. Therapists predicted the behavior of SOCs in virtual risk situations incorrect in 25% of all cases. Thus, virtual risk scenarios provide the possibility for practitioners to monitor the behavior of SOCs and to test their decisions on unsupervised privileges without endangering the community. This may provide additional information for therapy progress. Further studies are necessary to evaluate the predictive and ecological validity of behavioral

  20. Identification of patients at risk for ischaemic cerebral complications after carotid endarterectomy with TCD monitoring

    DEFF Research Database (Denmark)

    Horn, J; Naylor, A R; Laman, D M

    2005-01-01

    Transcranial Doppler (TCD) monitoring for micro embolic signals (MES), directly after carotid endarterectomy (CEA) may identify patients at risk of developing ischaemic complications. In this retrospective multicentre study, this hypothesis was investigated.......Transcranial Doppler (TCD) monitoring for micro embolic signals (MES), directly after carotid endarterectomy (CEA) may identify patients at risk of developing ischaemic complications. In this retrospective multicentre study, this hypothesis was investigated....

  1. A Novel and Cost-Effective Monitoring Approach for Outcomes in an Australian Biodiversity Conservation Incentive Program

    Science.gov (United States)

    Lindenmayer, David B.; Zammit, Charles; Attwood, Simon J.; Burns, Emma; Shepherd, Claire L.; Kay, Geoff; Wood, Jeff

    2012-01-01

    We report on the design and implementation of ecological monitoring for an Australian biodiversity conservation incentive scheme – the Environmental Stewardship Program. The Program uses competitive auctions to contract individual land managers for up to 15 years to conserve matters of National Environmental Significance (with an initial priority on nationally threatened ecological communities). The ecological monitoring was explicitly aligned with the Program’s policy objective and desired outcomes and was applied to the Program’s initial Project which targeted the critically endangered White Box-Yellow Box-Blakely's Red Gum Grassy Woodland and Derived Native Grassland ecological community in south eastern Australia. These woodlands have been reduced to <3% of their original extent and persist mostly as small remnants of variable condition on private farmland. We established monitoring sites on 153 farms located over 172,232 sq km. On each farm we established a monitoring site within the woodland patch funded for management and, wherever possible, a matched control site. The monitoring has entailed gathering data on vegetation condition, reptiles and birds. We also gathered data on the costs of experimental design, site establishment, field survey, and data analysis. The costs of monitoring are approximately 8.5% of the Program’s investment in the first four years and hence are in broad accord with the general rule of thumb that 5–10% of a program’s funding should be invested in monitoring. Once initial monitoring and site benchmarking are completed we propose to implement a novel rotating sampling approach that will maintain scientific integrity while achieving an annual cost-efficiency of up to 23%. We discuss useful lessons relevant to other monitoring programs where there is a need to provide managers with reliable early evidence of program effectiveness and to demonstrate opportunities for cost-efficiencies. PMID:23236399

  2. The Savannah River Site's Groundwater Monitoring Program - Second Quarter 1998 (April through June 1998)

    Energy Technology Data Exchange (ETDEWEB)

    Hutchison, J B

    1999-02-10

    This report summarizes the Groundwater Monitoring Program conducted by SRS during second quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for the program; provides a record of the program's activities; and serves as an official record of the analytical results.

  3. Development of a metrics dashboard for monitoring involvement in the 340B Drug Pricing Program.

    Science.gov (United States)

    Karralli, Rusol; Tipton, Joyce; Dumitru, Doina; Scholz, Lisa; Masilamani, Santhi

    2015-09-01

    An electronic tool to support hospital organizations in monitoring and addressing financial and compliance challenges related to participation in the 340B Drug Pricing Program is described. In recent years there has been heightened congressional and regulatory scrutiny of the federal 340B program, which provides discounted drug prices on Medicaid-covered drugs to safety net hospitals and other 340B-eligible healthcare organizations, or "covered entities." Historically, the 340B program has lacked a metrics-driven reporting framework to help covered entities capture the value of 340B program involvement, community benefits provided to underserved populations, and costs associated with compliance with 340B eligibility requirements. As part of an initiative by a large health system to optimize its 340B program utilization and regulatory compliance efforts, a team of pharmacists led the development of an electronic dashboard tool to help monitor 340B program activities at the system's 340B-eligible facilities. After soliciting input from an array of internal and external 340B program stakeholders, the team designed the dashboard and associated data-entry tools to facilitate the capture and analysis of 340B program-related data in four domains: cost savings and revenue, program maintenance costs, community benefits, and compliance. A large health system enhanced its ability to evaluate and monitor 340B program-related activities through the use of a dashboard tool capturing key metrics on cost savings achieved, maintenance costs, and other aspects of program involvement. Copyright © 2015 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  4. Using prescription monitoring program data to characterize out-of-pocket payments for opioid prescriptions in a state Medicaid program.

    Science.gov (United States)

    Hartung, Daniel M; Ahmed, Sharia M; Middleton, Luke; Van Otterloo, Joshua; Zhang, Kun; Keast, Shellie; Kim, Hyunjee; Johnston, Kirbee; Deyo, Richard A

    2017-09-01

    Out-of-pocket payment for prescription opioids is believed to be an indicator of abuse or diversion, but few studies describe its epidemiology. Prescription drug monitoring programs (PDMPs) collect controlled substance prescription fill data regardless of payment source and thus can be used to study this phenomenon. To estimate the frequency and characteristics of prescription fills for opioids that are likely paid out-of-pocket by individuals in the Oregon Medicaid program. Cross-sectional analysis using Oregon Medicaid administrative claims and PDMP data (2012 to 2013). Continuously enrolled nondually eligible Medicaid beneficiaries who could be linked to the PDMP with two opioid fills covered by Oregon Medicaid. Patient characteristics and fill characteristics for opioid fills that lacked a Medicaid pharmacy claim. Fill characteristics included opioid name, type, and association with indicators of high-risk opioid use. A total of 33 592 Medicaid beneficiaries filled a total of 555 103 opioid prescriptions. Of these opioid fills, 74 953 (13.5%) could not be matched to a Medicaid claim. Hydromorphone (30%), fentanyl (18%), and methadone (15%) were the most likely to lack a matching claim. The 3 largest predictors for missing claims were opioid fills that overlapped with other opioids (adjusted odds ratio [aOR] 1.37; 95% confidence interval [CI], 1.34-1.4), long-acting opioids (aOR 1.52; 95% CI, 1.47-1.57), and fills at multiple pharmacies (aOR 1.45; 95% CI, 1.39-1.52). Prescription opioid fills that were likely paid out-of-pocket were common and associated with several known indicators of high-risk opioid use. Copyright © 2017 John Wiley & Sons, Ltd.

  5. Rutgers Young Horse Teaching and Research Program: sustainability of taking a risk with "at risk" horses.

    Science.gov (United States)

    Ralston, Sarah L; Molnar, Anne

    2012-12-01

    In 1999, the Young Horse Teaching and Research Program (YHTRP) was initiated at Rutgers University. The unique aspect of the program was using horses generally considered "at risk" and in need of rescue, but of relatively low value. The risks of using horses from pregnant mare urine (PMU) ranches and Bureau of Land Management (BLM) mustangs were high, but, ultimately, unrealized. No students or staff members were seriously injured over the course of the next 12 yr, and the horses were sold annually as highly desirable potential athletes or pleasure horses, usually at a profit. The use of "at risk" horses generated a significant amount of positive media attention and attracted substantial funding in the form of donations and sponsorships, averaging over $60,000 (USD)per year. Despite economic downturns, public and industry support provided sustainability for the program with only basic University infrastructural support. Taking the risk of using "at risk" horses paid off, with positive outcomes for all.

  6. Harvesting Adaptation to Biodiversity Conservation in Sawmill Industry: Technology Innovation and Monitoring Program

    Directory of Open Access Journals (Sweden)

    Guillermo J. Martínez Pastur

    2007-09-01

    Full Text Available Social demands related to native forest ecosystems are based on an efficient management, with a balance between conservation and timber production. This paper describes the industry adaptation to a biodiversity program with an alternative regeneration method. The proposed method leaves 30% of the timber-quality forest as aggregated retention and 15 m² ha-1 basal area as dispersed retention. While many costs increased considerably, the incomes also may increase by applying new management strategies and technology innovation. A monitoring program was established in the harvested stands to evaluate the ecological functionality of the applied regeneration system (forest structure, climate change, regeneration dynamics, habitat quality and abiotic cycles. The implementation of an innovated technology and monitoring program in the forest and industry determined a balance between economic values and biodiversity conservation.

  7. Waterborne Release Monitoring and Surveillance Programs at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Blanchard, A.

    1999-03-26

    This report documents the liquid release environmental compliance programs currently in place at the Savannah river Site (SRS). Included are descriptions of stream monitoring programs, which measure chemical parameters and radionuclides in site streams and the Savannah river and test representative biological communities within the streams for chemical and radiological uptake. This report also explains the field sampling and analytical capabilities that are available at SRS during both normal and emergency conditions.

  8. Waterborne Release Monitoring and Surveillance Programs at the Savannah River Site

    International Nuclear Information System (INIS)

    Blanchard, A.

    1999-01-01

    This report documents the liquid release environmental compliance programs currently in place at the Savannah river Site (SRS). Included are descriptions of stream monitoring programs, which measure chemical parameters and radionuclides in site streams and the Savannah river and test representative biological communities within the streams for chemical and radiological uptake. This report also explains the field sampling and analytical capabilities that are available at SRS during both normal and emergency conditions

  9. The Savannah River Site's Groundwater Monitoring Program second quarter 1999 (April through June 1999)

    International Nuclear Information System (INIS)

    Hutchison, J.B.

    1999-01-01

    This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results

  10. 29 CFR 99.525 - Criteria for Federal program risk.

    Science.gov (United States)

    2010-07-01

    ... Auditors § 99.525 Criteria for Federal program risk. (a) General. The auditor's determination should be... Federal program. The auditor shall use auditor judgment and consider criteria, such as described in... analysis, the auditor may wish to discuss a particular Federal program with auditee management and the...

  11. Monitoring program for evaluating radionuclide emissions from incineration of low-level radioactive waste

    International Nuclear Information System (INIS)

    Wittmer, S.C.; Solomon, H.F.

    1984-01-01

    The implementation of an incineration program for low-level radioactive waste is a complex task, especially in the area of obtaining environmental permits. To provide assurance to the appropriate regulatory agencies involved with environmental permitting and others that an incineration program is properly conducted, emissions monitoring to identify radionuclides and their fate may be needed. An electronic spreadsheet software program Lotus 1-2-3 (Lotus Development Corporation) on an IBM Personal Computer has been used to perform data reduction for test results from such a monitoring program and to present them graphically to facilitate interpretation. The sampling technique includes: (1) the use of an EPA Method 5 stack sampling train modified to exclude the dry-catch filtration assembly with ethanolamine used to scrub incinerator gas at depressed temperatures and (2) a continuous composite liquid sampler for incinerator wet scrubber discharge to the sanitary sewer. Radionuclides in the samples are assayed using scintillation spectrometry

  12. Major Management Challenges and Program Risks: Small Business Administration

    Science.gov (United States)

    2001-01-01

    2001 Major Management Challenges and Program Risks Small Business AdministrationGAO-01-260 Form SF298 Citation Data Report Date ("DD MON YYYY...34) 00JAN2001 Report Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Small Business ...Administration (SBA) as it seeks to aid, counsel, assist, and protect the interests of the nations small businesses and help businesses and families

  13. Antepartum Fetal Monitoring and Spectral Analysis of Preterm Birth Risk

    Science.gov (United States)

    Păsăricără, Alexandru; Nemescu, Dragoş; Arotăriţei, Dragoş; Rotariu, Cristian

    2017-11-01

    The monitoring and analysis of antepartum fetal and maternal recordings is a research area of notable interest due to the relatively high value of preterm birth. The interest stems from the improvement of devices used for monitoring. The current paper presents the spectral analysis of antepartum heart rate recordings conducted during a study in Romania at the Cuza Voda Obstetrics and Gynecology Clinical Hospital from Iasi between 2010 and 2014. The study focuses on normal and preterm birth risk subjects in order to determine differences between these two types or recordings in terms of spectral analysis.

  14. The Savannah River Site`s Groundwater Monitoring Program: Fourth quarter 1991

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1992-06-02

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

  15. The Savannah River Site`s Groundwater Monitoring Program, second quarter 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-07

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

  16. The Savannah River Site`s Groundwater Monitoring Program: Second quarter 1992

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1992-10-07

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Since 1991, the flagging criteria have been based on the federal Environmental Protection Agency (EPA) drinking water standards and on method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1992 are listed in this report.

  17. The Savannah River Site`s Groundwater Monitoring Program. Second quarter, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-10

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

  18. Monitoring needs to perform ecological risk assessments in Switzerland

    Energy Technology Data Exchange (ETDEWEB)

    Kraeuchi, N.

    1999-07-01

    There is enormous pressure to come up with answers to questions asked by politicians and the public concerning the development of the environment and the potential risks society might be confronted with. Forests for example are expected to fulfill specific functions (e.g., timber production, protection of soil and water resources, recreation). As the environmental and social context itself is rapidly changing it is unknown what uses of a forest will appear in the future. The changing social and ecological context under which forestry operates is therefore calling for an appropriate management mode to deal with uncertainties. There is a need to act, monitor the results, learn from the past, adapt to new conditions through planning and to accept a philosophy of managing an ecosystem with the purpose of reducing potential future socio-ecological and environmental risk by understanding potential problems before they arise. Thus, ecosystem-based management must follow established ecological principles and appropriate guidelines must be derived from a thorough understanding of the origin of the risks potentially threatening the forests and the relevant ecosystem processes. In order to evaluate the likelihood that adverse ecological effects may occur as a result of exposure to one or more stressors long-term monitoring data, information, assumptions and uncertainties need to be systematically evaluated and analyzed. This is needed to understand and predict the relationships between stressors and ecological effects in a way that is useful for environmental decision making.

  19. Data analyses and modelling for risk based monitoring of mycotoxins in animal feed

    NARCIS (Netherlands)

    Ine van der Fels-Klerx, H.J.; Adamse, Paulien; Punt, Ans; Asselt, van Esther D.

    2018-01-01

    Following legislation, European Member States should have multi-annual control programs for contaminants, such as for mycotoxins, in feed and food. These programs need to be risk based implying the checks are regular and proportional to the estimated risk for animal and human health. This study

  20. Risk communications and the Chemical Stockpile Emergency-Planning Program

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  1. Identifying common practices and challenges for local urban tree monitoring programs across the United States

    Science.gov (United States)

    Lara A. Roman; E. Gregory McPherson; Bryant C. Scharenbroch; Julia. Bartens

    2013-01-01

    Urban forest monitoring data are essential to assess the impacts of tree planting campaigns and management programs. Local practitioners have monitoring projects that have not been well documented in the urban forestry literature. To learn more about practitioner-driven monitoring efforts, the authors surveyed 32 local urban forestry organizations across the United...

  2. The Integrated Status and Effectiveness Monitoring Program : Expansion of Existing Smolt Trapping Program and Steelhead Spawner Surveys : March 1st, 2008 - February 28th, 2009.

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Todd; Tonseth, Michael

    2009-01-01

    The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-0017) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a

  3. Prescription Drug Monitoring Programs and Pharmacist Orientation Toward Dispensing Controlled Substances.

    Science.gov (United States)

    Fendrich, Michael; Bryan, Janelle K; Hooyer, Katinka

    2018-01-03

    We sought to understand how pharmacists viewed and used a newly implemented prescription drug monitoring program (PDMP). We also sought to understand pharmacist orientation toward dispensing of controlled substances and the people who obtain them. We conducted three mini focus groups. The focus group findings were used to inform the design of a structured survey. We emailed a survey to 160 pharmacists who were employed in one statewide community chain store; we obtained 48 survey responses. Focus groups findings suggested that, in relation to the dispensing of scheduled prescription medication, pharmacists were either "healthcare" oriented, "law-enforcement" oriented, or an orientation that combined these two perspectives. Surveys suggested that pharmacists found PDMPs easy to use and that they used them frequently - often to contact physicians directly. Surveys suggested that pharmacists were typically either "healthcare" oriented or "mixed" (combined perspectives). Pharmacist orientation was associated with the frequency with which they counseled patients about medication risk and the frequency with which they used the PDMP as the basis for contacting prescribers. Ongoing tracking of pharmacists' use of PDMPs is important both at the implementation stage and as PDMPs develop over time. The orientation construct developed here is useful in understanding pharmacist behavior and attitudes towards patients potentially at risk for misuse of controlled substance medications. Further research on this construct could shed light on barriers and incentives for pharmacist PDMP participation and use and provide guidance for pharmacist training, ultimately enhancing patient care.

  4. Area Monitoring Dosimeter Program for the Pacific Northwest National Laboratory: Results for CY 2000

    International Nuclear Information System (INIS)

    Bivins, Steven R; Stoetzel, Gregory A

    2001-01-01

    Pacific Northwest National Laboratory (PNNL) established an area monitoring dosimeter program in accordance with Article 514 of the Department of Energy (DOE) Radiological Control Manual (RCM) in January 1993. This program is to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with 10 CFR Part 835.402 (a) (1)-(4) and Article 511.1 of the DOE Standard Radiological Control, personnel dosimetry shall be provided to (1) radiological workers who are likely to receive at least 100 mrem annually, and (2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results for calendar years 1993-2000 confirm that personnel dosimetry is not needed for individuals located in areas monitored by the program

  5. [Design and Application of High-risk Pregnancy Monitoring & Warning Internet Platform Based on Internet of Things].

    Science.gov (United States)

    Lu, Heqing; Zhang, Xiaofeng; Li, Bin

    2017-09-30

    Through illustrating the designing of high-risk pregnancy maternal-fetal monitoring system based on the internet of things, this paper introduced the specific application of using wearable medical devices to provide maternal-fetal mobile medical services. With the help of big data and cloud obstetrics platform, the monitoring and warning network was further improved, the level-to-level administration of high-risk pregnancy was realized, the level of perinatal health care was enhanced and the risk of critical emergency of pregnancy decreased.

  6. Specialist Cohort Event Monitoring studies: a new study method for risk management in pharmacovigilance.

    Science.gov (United States)

    Layton, Deborah; Shakir, Saad A W

    2015-02-01

    The evolving regulatory landscape has heightened the need for innovative, proactive, efficient and more meaningful solutions for 'real-world' post-authorization safety studies (PASS) that not only align with risk management objectives to gather additional safety monitoring information or assess a pattern of drug utilization, but also satisfy key regulatory requirements for marketing authorization holder risk management planning and execution needs. There is a need for data capture across the primary care and secondary care interface, or for exploring use of new medicines in secondary care to support conducting PASS. To fulfil this need, event monitoring has evolved. The Specialist Cohort Event Monitoring (SCEM) study is a new application that enables a cohort of patients prescribed a medicine in the hospital and secondary care settings to be monitored. The method also permits the inclusion of a comparator cohort of patients receiving standard care, or another counterfactual comparator group, to be monitored concurrently, depending on the study question. The approach has been developed in parallel with the new legislative requirement for pharmaceutical companies to undertake a risk management plan as part of post-authorization safety monitoring. SCEM studies recognize that the study population comprises those patients who may have treatment initiated under the care of specialist health care professionals and who are more complex in terms of underlying disease, co-morbidities and concomitant medications than the general disease population treated in primary care. The aims of this paper are to discuss the SCEM new-user study design, rationale and features that aim to address possible bias (such as selection bias) and current applications.

  7. The effectiveness of risk management program on pediatric nurses' medication error.

    Science.gov (United States)

    Dehghan-Nayeri, Nahid; Bayat, Fariba; Salehi, Tahmineh; Faghihzadeh, Soghrat

    2013-09-01

    Medication therapy is one of the most complex and high-risk clinical processes that nurses deal with. Medication error is the most common type of error that brings about damage and death to patients, especially pediatric ones. However, these errors are preventable. Identifying and preventing undesirable events leading to medication errors are the main risk management activities. The aim of this study was to investigate the effectiveness of a risk management program on the pediatric nurses' medication error rate. This study is a quasi-experimental one with a comparison group. In this study, 200 nurses were recruited from two main pediatric hospitals in Tehran. In the experimental hospital, we applied the risk management program for a period of 6 months. Nurses of the control hospital did the hospital routine schedule. A pre- and post-test was performed to measure the frequency of the medication error events. SPSS software, t-test, and regression analysis were used for data analysis. After the intervention, the medication error rate of nurses at the experimental hospital was significantly lower (P error-reporting rate was higher (P medical environment, applying the quality-control programs such as risk management can effectively prevent the occurrence of the hospital undesirable events. Nursing mangers can reduce the medication error rate by applying risk management programs. However, this program cannot succeed without nurses' cooperation.

  8. Pain management and opioid risk mitigation in the military.

    Science.gov (United States)

    Sharpe Potter, Jennifer; Bebarta, Vikhyat S; Marino, Elise N; Ramos, Rosemarie G; Turner, Barbara J

    2014-05-01

    Opioid analgesics misuse is a significant military health concern recognized as a priority issue by military leadership. Opioids are among those most commonly prescribed medications in the military for pain management. The military has implemented opioid risk mitigation strategies, including the Sole Provider Program and the Controlled Drug Management Analysis and Reporting Tool, which are used to identify and monitor for risk and misuse. However, there are substantial opportunities to build on these existing systems to better ensure safer opioid prescribing and monitor for misuse. Opioid risk mitigation strategies implemented by the civilian sector include establishing clinical guidelines for opioid prescribing and prescription monitoring programs. These strategies may help to inform opioid risk mitigation in the military health system. Reducing the risk of opioid misuse and improving quality of care for our Warfighters is necessary. This must be done through evidence-based approaches with an investment in research to improve patient care and prevent opioid misuse as well as its sequelae. Reprint & Copyright © 2014 Association of Military Surgeons of the U.S.

  9. Annual report on the Monitoring of good practices programs and independence for electricity and natural gas system operators - 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 2. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2006. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2006 and audits carried out by the CRE services in these companies in 2006

  10. Annual report on the Monitoring of good practices programs and independence for electricity and natural gas system operators - 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 3. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2007. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2007 and audits carried out by the CRE services in these companies in 2007

  11. A simulation model of IT risk on program trading

    Science.gov (United States)

    Xia, Bingying; Jiang, Wenbao; Luo, Guangxuan

    2015-12-01

    The biggest difficulty for Program trading IT risk measures lies in the loss of data, in view of this situation, the current scholars approach is collecting court, network and other public media such as all kinds of accident of IT both at home and abroad for data collection, and the loss of IT risk quantitative analysis based on this database. However, the IT risk loss database established by this method can only fuzzy reflect the real situation and not for real to make fundamental explanation. In this paper, based on the study of the concept and steps of the MC simulation, we use computer simulation method, by using the MC simulation method in the "Program trading simulation system" developed by team to simulate the real programming trading and get the IT risk loss of data through its IT failure experiment, at the end of the article, on the effectiveness of the experimental data is verified. In this way, better overcome the deficiency of the traditional research method and solves the problem of lack of IT risk data in quantitative research. More empirically provides researchers with a set of simulation method are used to study the ideas and the process template.

  12. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J. [Pacific Northwest Lab., Richland, WA (United States); Roybal, A.L. [Western Area Power Administration, Golden, CO (United States)

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  13. A Citizen Science Program for Monitoring Lake Stages in Northern Wisconsin

    Science.gov (United States)

    Kretschmann, A.; Drum, A.; Rubsam, J.; Watras, C. J.; Cellar-Rossler, A.

    2011-12-01

    Historical data indicate that surface water levels in northern Wisconsin are fluctuating more now than they did in the recent past. In the northern highland lake district of Vilas County, Wisconsin, concern about record low lake levels in 2008 spurred local citizens and lake associations to form a lake level monitoring network comprising citizen scientists. The network is administered by the North Lakeland Discovery Center (NLDC, a local NGO) and is supported by a grant from the Citizen Science Monitoring Program of the Wisconsin Department of Natural Resources (WDNR). With technical guidance from limnologists at neighboring UW-Madison Trout Lake Research Station, citizen scientists have installed geographic benchmarks and staff gauges on 26 area lakes. The project engages citizen and student science participants including homeowners, non-profit organization member-participants, and local schools. Each spring, staff gauges are installed and referenced to fixed benchmarks after ice off by NLDC and dedicated volunteers. Volunteers read and record staff gauges on a weekly basis during the ice-free season; and maintain log books recording lake levels to the nearest 0.5 cm. At the end of the season, before ice on, gauges are removed and log books are collected by the NLDC coordinator. Data is compiled and submitted to a database management system, coordinated within the Wisconsin Surface Water Integrated Monitoring System (SWIMS), a statewide information system managed by the WDNR in Madison. Furthermore, NLDC is collaborating with the SWIMS database manager to develop data entry screens based on records collected by citizen scientists. This program is the first of its kind in Wisconsin to utilize citizen scientists to collect lake level data. The retention rate for volunteers has been 100% over the three years since inception, and the program has expanded from four lakes in 2008 to twenty-six lakes in 2011. NLDC stresses the importance of long-term monitoring and the

  14. Lake Roosevelt fisheries monitoring program

    International Nuclear Information System (INIS)

    Griffith, J.R.; Scholz, A.T.

    1991-01-01

    The purpose of this study was to provide baseline data that could be used to evaluate the effectiveness of two kokanee salmon hatcheries that will produce 8 million kokanee salmon (Oncorhynchus nerka) fry or 3.2 million adults for stocking into Lake Roosevelt. The hatcheries will also produce 500,000 rainbow trout (Oncorhynchus mykiss) fingerlings to support the Lake Roosevelt net-pen programs. The baseline data will also be used to evaluate the effectiveness of the habitat improvement projects ongoing on a separate contract. At the present time, the principle sport fish in the reservoir are net-pen rainbow trout and walleye (Stizostedion vitreum). The objectives of the second year of the monitoring program were: (1) to determine angling pressure, catch per unit effort, total harvest and the economic value; (2) to determine relative abundance of fish species in the reservoir by conducting electrofishing and gillnet surveys at nine index stations during May, August, and October; (3) to determine growth rates of kokanee, rainbow trout, and walleye based upon backcalculations from scales collected during May, August and October and creel surveys; (4) to determine density, size, and biomass of zooplankton and how reservoir operations affect their population dynamics; (5) to determine feeding habits of kokanee, rainbow trout, and walleye and their preferred prey densities; and (6) to determine migration patterns of tagged walleye and net-pen rainbow trout. 118 refs., 20 figs., 98 tabs

  15. Risk assessment in the DOE Assurance Program for Remedial Action

    International Nuclear Information System (INIS)

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly

  16. Parental monitoring, parent-adolescent communication about sex, and sexual risk among young men who have sex with men.

    Science.gov (United States)

    Thoma, Brian C; Huebner, David M

    2014-08-01

    Parental monitoring and parent-adolescent communication about sex protect against HIV-related sexual risk behaviors among heterosexual adolescents, but it is unknown if these findings generalize to young men who have sex with men (YMSM). Sexual orientation-specific stressors, including "coming out" to parents, complicate the family context of YMSM. We examined associations between parental monitoring, communication about sex, outness to cohabitating parents, and sexual behaviors. Ethnically diverse YMSM ages 14-19 provided cross-sectional data (n = 257). Monitoring and outness to parents interacted to predict recent same-sex unprotected anal intercourse (UAI). For YMSM who reported mixed or uncertain outness to parents, higher levels of perceived parental monitoring were associated with greater risk of UAI. Higher levels of communication about sex were associated with greater risk of UAI for YMSM out to parents. Parental monitoring and communication about sex might not protect YMSM against sexual risk in the same way they protect heterosexual youth. Future research should examine whether adapted forms of family factors could protect YMSM, and family-based HIV risk-reduction interventions for YMSM should be attuned to the unique ways family factors function within this group.

  17. Integrated Status and Effectiveness Monitoring Program - Entiat River Snorkel Surveys, 2006-2007.

    Energy Technology Data Exchange (ETDEWEB)

    Nelle, R.D.

    2007-10-01

    The USFWS Mid-Columbia River Fishery Resource Office conducted snorkel surveys at 11 sites during the summer 2006 survey period and at 15 sites during fall 2006 and winter 2007 survey periods as part of the Integrated Status and Effectiveness Monitoring Program in the Entiat River. A total of 39,898 fish from 14 species/genera and an unknown category were enumerated. Chinook salmon were the overall most common fish observed and comprised 19% of fish enumerated followed by mountain whitefish (18%) and rainbow trout (14%). Day and night surveys were conducted during the summer 2006 period (August), while night surveys were conducted during the fall 2006 (October) and winter 2007 (February/March) surveys. This is second annual progress report to Bonneville Power Administration for the snorkel surveys conducted in the Entiat River as related to long-term effectiveness monitoring of restoration programs in this watershed. The objective of this study is to monitor the fish habitat utilization of planned in-stream restoration efforts in the Entiat River by conducting pre- and post-construction snorkel surveys at selected treatment and control sites.

  18. Risk-based priority scoring for Brookhaven National Laboratory environmental restoration programs

    International Nuclear Information System (INIS)

    Morris, S.C.; Meinhold, A.F.

    1995-05-01

    This report describes the process of estimating the risk associated with environmental restoration programs under the Brookhaven National Laboratory Office of Environmental Restoration. The process was part of an effort across all Department of Energy facilities to provide a consistent framework to communicate risk information about the facilities to senior managers in the DOE Office of Environmental Management to foster understanding of risk activities across programs. the risk evaluation was a qualitative exercise. Categories considered included: Public health and safety; site personnel safety and health; compliance; mission impact; cost-effective risk management; environmental protection; inherent worker risk; environmental effects of clean-up; and social, cultural, political, and economic impacts

  19. Monitoring and evaluation of mental health and psychosocial support programs in humanitarian settings: a scoping review of terminology and focus.

    Science.gov (United States)

    Augustinavicius, Jura L; Greene, M Claire; Lakin, Daniel P; Tol, Wietse A

    2018-01-01

    Monitoring and evaluation of mental health and psychosocial support (MHPSS) programs is critical to facilitating learning and providing accountability to stakeholders. As part of an inter-agency effort to develop recommendations on MHPSS monitoring and evaluation, this scoping review aimed to identify the terminology and focus of monitoring and evaluation frameworks in this field. We collected program documents (logical frameworks (logframes) and theories of change) from members of the Inter-Agency Standing Committee Reference Group on MHPSS, and systematically searched the peer-reviewed literature across five databases. We included program documents and academic articles that reported on monitoring and evaluation of MHPSS in low- and middle-income countries describing original data. Inclusion and data extraction were conducted in parallel by independent reviewers. Thematic analysis was used to identify common language in the description of practices and the focus of each monitoring and evaluation framework. Logframe outcomes were mapped to MHPSS activity categories. We identified 38 program documents and 89 peer-reviewed articles, describing monitoring and evaluation of a wide range of MHPSS activities. In both program documents and peer-reviewed literature there was a lack of specificity and overlap in language used for goals and outcomes. Well-validated, reliable instruments were reported in the academic literature, but rarely used in monitoring and evaluation practices. We identified six themes in the terminology used to describe goals and outcomes. Logframe outcomes were more commonly mapped to generic program implementation activities (e.g. "capacity building") and those related to family and community support, while outcomes from academic articles were most frequently mapped to specialized psychological treatments. Inconsistencies between the language used in research and practice and discrepancies in measurement have broader implications for monitoring and

  20. Enhancement of Self-Monitoring in a Web-Based Weight Loss Program by Extra Individualized Feedback and Reminders: Randomized Trial.

    Science.gov (United States)

    Hutchesson, Melinda Jane; Tan, Chor Yin; Morgan, Philip; Callister, Robin; Collins, Clare

    2016-04-12

    Self-monitoring is an essential behavioral strategy for effective weight loss programs. Traditionally, self-monitoring has been achieved using paper-based records. However, technology is now more frequently used to deliver treatment programs to overweight and obese adults. Information technologies, such as the Internet and mobile phones, allow innovative intervention features to be incorporated into treatment that may facilitate greater adherence to self-monitoring processes, provide motivation for behavior change, and ultimately lead to greater weight loss success. The objective of our study was to determine whether the consistency of self-monitoring differed between participants randomly assigned to a basic or an enhanced 12-week commercial Web-based weight loss program. We randomly assigned a sample of 301 adults (mean age 42.3 years; body mass index 31.3 kg/m2; female 176/301, 58.5%) to the basic or enhanced group. The basic program included tools for self-monitoring (online food and exercise diary, and a weekly weigh-in log) with some feedback and reminders to weigh in (by text or email). The enhanced program included the basic components, as well as extra individualized feedback on self-monitoring entries and reminders (by text, email, or telephone) to engage with self-monitoring tools. We evaluated the level of self-monitoring by examining the consistency of self-monitoring of food, exercise, and weight during the 12 weeks. Consistency was defined as the number of weeks during which participants completed a criterion number of entries (ie, ≥3 days of online food or exercise diary records per week and ≥1 weigh-in per week). The enhanced group's consistency of use of self-monitoring tools was significantly greater than that of the basic group throughout the 12 weeks (median consistency for food 8 vs 3 weeks, respectively, Pself-monitoring behaviors in a Web-based weight loss program. Australian New Zealand Clinical Trials Registry (ANZCTR): ACTRN

  1. Information support of monitoring of technical condition of buildings in construction risk area

    Science.gov (United States)

    Skachkova, M. E.; Lepihina, O. Y.; Ignatova, V. V.

    2018-05-01

    The paper presents the results of the research devoted to the development of a model of information support of monitoring buildings technical condition; these buildings are located in the construction risk area. As a result of the visual and instrumental survey, as well as the analysis of existing approaches and techniques, attributive and cartographic databases have been created. These databases allow monitoring defects and damages of buildings located in a 30-meter risk area from the object under construction. The classification of structures and defects of these buildings under survey is presented. The functional capabilities of the developed model and the field of it practical applications are determined.

  2. The NASA Goddard Group's Source Monitoring Database and Program

    Science.gov (United States)

    Gipson, John; Le Bail, Karine; Ma, Chopo

    2014-12-01

    Beginning in 2003, the Goddard VLBI group developed a program to purposefully monitor when sources were observed and to increase the observations of ``under-observed'' sources. The heart of the program consists of a MySQL database that keeps track of, on a session-by-session basis: the number of observations that are scheduled for a source, the number of observations that are successfully correlated, and the number of observations that are used in a session. In addition, there is a table that contains the target number of successful sessions over the last twelve months. Initially this table just contained two categories. Sources in the geodetic catalog had a target of 12 sessions/year; the remaining ICRF-1 defining sources had a target of two sessions/year. All other sources did not have a specific target. As the program evolved, different kinds of sources with different observing targets were added. During the scheduling process, the scheduler has the option of automatically selecting N sources which have not met their target. We discuss the history and present some results of this successful program.

  3. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  4. Model for the elaboration of program of environmental radiological monitoring reports

    International Nuclear Information System (INIS)

    2005-11-01

    This Regulation refers to the requirements of the Regulation CNEN-NN.3.01 'Basic Guidelines for Radiation Protection', expressed in the section 5.14, and its application related to the emission of reports of Environmental Radiological Monitoring Program to be submitted to CNEN evaluation

  5. 77 FR 71609 - Self-Help Homeownership Opportunity Program (SHOP) Grant Monitoring

    Science.gov (United States)

    2012-12-03

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5603-N-89] Self-Help Homeownership Opportunity Program (SHOP) Grant Monitoring AGENCY: Office of the Chief Information Officer, HUD. ACTION... electronic submission of responses. This notice also lists the following information: Title of Proposed: Self...

  6. The influence of prescription monitoring programs on chronic pain management.

    Science.gov (United States)

    Wang, Jing; Christo, Paul J

    2009-01-01

    Abuse of prescribed controlled substance has become a serious social as well as health care issue over the past decade. A particularly alarming trend exists among patients aged 12 to 17. Common abuse behaviors include doctor shopping, drug theft, feigned pain symptoms to gain health care access, drug sharing, prescription forgery, and improper prescription practices. In response to this epidemic of abuse, many states have adopted prescription monitoring programs (PMPs). Such programs first originated in the early twentieth century. As of 2006, 38 states had such programs, many of which are supported by federal grants. As PMPs become more widespread, they have also increased in sophistication. By keeping a record of the prescription and dispensing of narcotics, these programs are able to build a comprehensive data network for tracking prescription medications. These databases aid law enforcement agencies in investigations of narcotic trafficking; they also help state regulatory boards to monitor improper prescription practices. This manuscript examines the basic structure of a PMP, including the way the data are collected and the way these data are stored and used. It also looks at the organizational differences amongst state programs. NASPER and Harold Rogers are two federal programs that provide funding to the state PMPs, and the current study examines the differences as well as similarities between these 2 programs. This study also compares the results of 2 reports: the U.S. General Accounting Office Study and the Twillman study.& Both studies have evaluated the efficiency of the PMPs. The U.S. General Accounting Office Study showed that while considerable differences exist among the state PMPs, these programs not only reduce the time and effort for law enforcement agencies to conduct investigations, but also cut the supply of prescription medications. However, the Twillman report suggests that prescription programs caused a shift in prescription practice, while

  7. Risk Management Program Application for the Component Test Capability

    International Nuclear Information System (INIS)

    Stephanie L. Austad; Jeffrey D. Bryan

    2009-01-01

    This paper documents the application of the risk management program requirements to Component Test Capability (CTC) Project activities for each CTC alternative. In particular, DOE O 413.3A, 'Program and Project Management for the Acquisition of Capital Assets,' and DOE G 413.3-7, 'Risk Management Guide for Project Management,' will apply in the event that Alternative 4, Single, Standalone Component Test Facility (CTF), is selected and approved. As such, it is advisable to begin planning to meet the associated Department of Energy (DOE) requirements and guidance as early in the acquisition process as practicable. This white paper is intended to assist in this planning and to support associated decision-making activities. Nontechnical risks associated with each alternative will be identified to support the Next Generation Nuclear Plant (NGNP) CTC alternatives analysis. Technical risks are assumed to be addressed through the Technology Development Risk Management modeling process and are inherent to the alternatives

  8. Hanford Site's Integrated Risk Assessment Program: No-intervention risk assessment

    International Nuclear Information System (INIS)

    Mahaffey, J.A.; Dukelow, J.S. Jr.; Stenner, R.D.

    1994-08-01

    The long-term goal of the Integrated Risk Assessment program (IRAP) is to estimate risks to workers, the public, organizations, and groups with reserved rights to Site access, the ecosystem, and natural resources to aid in managing environmental restoration and waste management at the Hanford Site. For each of these, information is needed about current risks, risks during cleanup, and endstate risks. The objective is three-fold: to determine if and when to remediate, and to what extent; to identify information unavailable but needed to make better cleanup decisions; to establish technology performance criteria for achieving desired cleanup levels; to understand costs and benefits of activities from a Site-wide perspective. The no-intervention risk, assessment is the initial evaluation of public health risks conducted under IRAP. The objective is to identify types of activities that the US Department of Energy (DOE) must accomplish for closure of the Hanford Site, defined as no further DOE intervention. There are two primary conclusions from the no-intervention risk assessment. First, some maintenance and operations activities at Hanford must be continued to protect the public from grave risks. However, when large Hanford expenditures are compared to cleanup progress, funds expended for maintenance and operations must be put in proper perspective. Second, stakeholder's emphasis on public risks at Hanford, as indicated by remediation priorities, are not in line with those estimated. The focus currently is on compliance with regulations, and on dealing with issues which are visible to stakeholders

  9. Use of risk-adjusted CUSUM charts to monitor 30-day mortality in Danish hospitals

    Directory of Open Access Journals (Sweden)

    Rasmussen TB

    2018-04-01

    Full Text Available Thomas Bøjer Rasmussen, Sinna Pilgaard Ulrichsen, Mette Nørgaard Department of Clinical Epidemiology, Aarhus University Hospital, Aarhus N, Denmark Background: Monitoring hospital outcomes and clinical processes as a measure of clinical performance is an integral part of modern health care. The risk-adjusted cumulative sum (CUSUM chart is a frequently used sequential analysis technique that can be implemented to monitor a wide range of different types of outcomes.Objective: The aim of this study was to describe how risk-adjusted CUSUM charts based on population-based nationwide medical registers were used to monitor 30-day mortality in Danish hospitals and to give an example on how alarms of increased hospital mortality from the charts can guide further in-depth analyses.Materials and methods: We used routinely collected administrative data from the Danish National Patient Registry and the Danish Civil Registration System to create risk-adjusted CUSUM charts. We monitored 30-day mortality after hospital admission with one of 77 selected diagnoses in 24 hospital units in Denmark in 2015. The charts were set to detect a 50% increase in 30-day mortality, and control limits were determined by simulations.Results: Among 1,085,576 hospital admissions, 441,352 admissions had one of the 77 selected diagnoses as their primary diagnosis and were included in the risk-adjusted CUSUM charts. The charts yielded a total of eight alarms of increased mortality. The median of the hospitals’ estimated average time to detect a 50% increase in 30-day mortality was 50 days (interquartile interval, 43;54. In the selected example of an alarm, descriptive analyses indicated performance problems with 30-day mortality following hip fracture surgery and diagnosis of chronic obstructive pulmonary disease.Conclusion: The presented implementation of risk-adjusted CUSUM charts can detect significant increases in 30-day mortality within 2 months, on average, in most

  10. Risk monitors - The State of the Art in their Development and Use at Nuclear Power Plants - Produced on behalf of IAEA and OECD/NEA WGRisk

    International Nuclear Information System (INIS)

    Shepherd, C.H.; Yllera, F.J.; Kaufer, B.; Henneke, D.W.; Gaynor, D.; Sedlak, J.; Evans, M.G.K.; Boneham, P.; Horne, B.; Guymer, P.; Hatfield, M.; Hewitt, J.; Shanley, L.; Sorman, J.; Chao, C.C.; Pullen, R.; Reinhart, F.M.; Lantaron, A.; Huerta, A.; Vojnovic, D.; Hollo, E.; Fukuda, M.; De Gelder, P.; Schulz, R.; Lanore, J.M.

    2004-01-01

    This report provides a description of the state-of-the-art in the development and use of Risk Monitors at nuclear power plants in the Member States. The work has been carried out jointly by IAEA and OECD WGRisk. The information presented in this report has been obtained from three questionnaires on the development and use of Risk Monitors, software and Regulatory perspectives; from OECD and IAEA Workshops on Risk Monitors; and from IAEA consultants meetings and WGRisk Task Group meetings. Some of the work carried out to produce the report has been funded by the United Kingdom Nuclear Installations Inspectorate. The aim is to produce a report that describes the state of the art in the development of Risk Monitors and their use at nuclear power plants. This will: - define the terminology that relates to Risk Monitors as used in this report, - describe the state of the art in the development and use of Risk Monitors at nuclear power plants, and indicate future developments, - provide information on the software packages available for Risk Monitors, - identify the issues that need to be addressed in the development of a Living PSA for use in a Risk Monitor application and give guidance on how these issues can be resolved, - give information on the issues relating to the design of the Risk Monitor operator interface so that it gives a tool that can be used by all station staff, - discuss the issues that relate to the qualitative and quantitative risk measures addressed by Risk Monitors such as the definition of the Operational Safety Criteria which define the risk levels, the calculation of the Allowed Configuration Time and the definition of the qualitative risk levels that relate to the availability of safety systems, - give insights into the costs involved, the benefits that can be obtained from Risk Monitors and their limitations, and - discuss the regulatory perspective on the use of Risk Monitors to provide risk information that can be used during nuclear power

  11. Structural health monitoring feature design by genetic programming

    International Nuclear Information System (INIS)

    Harvey, Dustin Y; Todd, Michael D

    2014-01-01

    Structural health monitoring (SHM) systems provide real-time damage and performance information for civil, aerospace, and other high-capital or life-safety critical structures. Conventional data processing involves pre-processing and extraction of low-dimensional features from in situ time series measurements. The features are then input to a statistical pattern recognition algorithm to perform the relevant classification or regression task necessary to facilitate decisions by the SHM system. Traditional design of signal processing and feature extraction algorithms can be an expensive and time-consuming process requiring extensive system knowledge and domain expertise. Genetic programming, a heuristic program search method from evolutionary computation, was recently adapted by the authors to perform automated, data-driven design of signal processing and feature extraction algorithms for statistical pattern recognition applications. The proposed method, called Autofead, is particularly suitable to handle the challenges inherent in algorithm design for SHM problems where the manifestation of damage in structural response measurements is often unclear or unknown. Autofead mines a training database of response measurements to discover information-rich features specific to the problem at hand. This study provides experimental validation on three SHM applications including ultrasonic damage detection, bearing damage classification for rotating machinery, and vibration-based structural health monitoring. Performance comparisons with common feature choices for each problem area are provided demonstrating the versatility of Autofead to produce significant algorithm improvements on a wide range of problems. (paper)

  12. Optimising an integrated crop-livestock farm using risk programming

    Directory of Open Access Journals (Sweden)

    SE Visagie

    2004-06-01

    Full Text Available Numerous studies have analysed farm planning decisions focusing on producer risk preferences. Few studies have focussed on the farm planning decisions in an integrated croplivestock farm context. Income variability and means of managing risk continues to receive much attention in farm planning research. Different risk programming models have attempted to focus on minimising the income variability of farm activities. This study attempts to identify the optimal mix of crops and the number of animals the farm needs to keep in the presence of crop production risk for a range of risk levels. A mixed integer linear programming model was developed to model the decision environment faced by an integrated crop-livestock farmer. The deviation of income from the expected value was used as a measure of risk. A case study is presented with representative data from a farm in the Swartland area. An investigation of the results of the model under different constraints shows that, in general, strategies that depend on crop rotation principles are preferred to strategies that follow mono-crop production practices.

  13. Monitoring of newborns at high risk for brain injury

    OpenAIRE

    Pisani, Francesco; Spagnoli, Carlotta

    2016-01-01

    Due to the increasing number of surviving preterm newborns and to the recognition of therapeutic hypothermia as the current gold standard in newborns with hypoxic-ischaemic encephalopathy, there has been a growing interest in the implementation of brain monitoring tools in newborns at high risk for neurological disorders. Among the most frequent neurological conditions and presentations in the neonatal period, neonatal seizures and neonatal status epilepticus, paroxysmal non-epileptic motor p...

  14. Validation of an age-modified caries risk assessment program (Cariogram) in preschool children

    DEFF Research Database (Denmark)

    Holgerson, Pernilla Lif; Twetman, Svante; Stecksèn-Blicks, Christina

    2009-01-01

    OBJECTIVES: (i) To validate caries risk profiles assessed with a computer program against actual caries development in preschool children, (ii) to study the possible impact of a preventive program on the risk profiles, and (iii) to compare the individual risk profiles longitudinally. MATERIAL...... of sugar. The majority of the children who changed category displayed a lowered risk at 7 years. The intervention program seemed to impair the predictive abilities of Cariogram. CONCLUSION: A modified Cariogram applied on preschool children was not particularly useful in identifying high caries risk...

  15. TRECII: a computer program for transportation risk assessment

    International Nuclear Information System (INIS)

    Franklin, A.L.

    1980-05-01

    A risk-based fault tree analysis method has been developed at the Pacific Northwest Laboratory (PNL) for analysis of nuclear fuel cycle operations. This methodology was developed for the Department of Energy (DOE) as a risk analysis tool for evaluating high level waste management systems. A computer package consisting of three programs was written at that time to assist in the performance of risk assessment: ACORN (draws fault trees), MFAULT (analyzes fault trees), and RAFT (calculates risk). This methodology evaluates release consequences and estimates the frequency of occurrence of these consequences. This document describes an additional risk calculating code which can be used in conjunction with two of the three codes for transportation risk assessment. TRECII modifies the definition of risk used in RAFT (prob. x release) to accommodate release consequences in terms of fatalities. Throughout this report risk shall be defined as probability times consequences (fatalities are one possible health effect consequence). This methodology has been applied to a variety of energy material transportation systems. Typically the material shipped has been radioactive, although some adaptation to fossil fuels has occurred. The approach is normally applied to truck or train transport systems with some adaptation to pipelines and aircraft. TRECII is designed to be used primarily in conjunction with MFAULT; however, with a moderate amount of effort by the user, it can be implemented independent of the risk analysis package developed at PNL. Code description and user instructions necessary for the implementation of the TRECII program are provided

  16. 75 FR 30106 - Terrorism Risk Insurance Program; Recordkeeping Requirements for Insurers Compensated Under the...

    Science.gov (United States)

    2010-05-28

    ... DEPARTMENT OF THE TREASURY Terrorism Risk Insurance Program; Recordkeeping Requirements for... Budget. The Terrorism Risk Insurance Program Office within the Department of the Treasury is soliciting... original and two copies) to: Terrorism Risk Insurance Program, Public Comment Record, Suite 2100...

  17. Impact of legislation and a prescription monitoring program on the prevalence of potentially inappropriate prescriptions for monitored drugs in Ontario: a time series analysis

    Science.gov (United States)

    Juurlink, David; Yao, Zhan; Camacho, Ximena; Paterson, J. Michael; Singh, Samantha; Dhalla, Irfan; Sproule, Beth; Mamdani, Muhammad

    2014-01-01

    Background The increased use of opioid analgesics, sedative hypnotics and stimulants, coupled with the associated risks of overdose have raised concerns around the inappropriate prescribing of these monitored drugs. We assessed the impact of new legislation, the Narcotics Safety and Awareness Act, and a centralized Narcotics Monitoring System (implemented November 2011 and May 2012, respectively), on the dispensing of prescriptions suggestive of misuse. Methods We conducted a time series analysis of publicly funded prescriptions for opioids, benzodiazepines and stimulants dispensed monthly in Ontario from January 2007 to May 2013, based on information in the Ontario Public Drug Benefit Database. In the primary analysis, a prescription was deemed potentially inappropriate if it was dispensed within 7 days of an earlier prescription and was for at least 30 tablets of a drug in the same class as the earlier prescription, but originated from a different physician and a different pharmacy. Results After enactment of the new legislation, the prevalence of potentially inappropriate opioid prescriptions decreased by 12.5% in 6 months (from 1.6% in October 2011 to 1.4% in April 2012; p = 0.01). No further significant change was observed after the introduction of the narcotic monitoring system (p = 0.8). By May 2013, the prevalence had dropped to 1.0%. Inappropriate benzodiazepine prescribing was significantly influenced by both the legislation (p significantly influenced by the introduction of the monitoring system in May 2012, falling from 0.7% in April 2012 to 0.3% in May 2013 (p = 0.02). Interpretation For a select group of drugs prone to misuse and diversion, legislation and a prescription monitoring program reduced the prevalence of prescriptions suggestive of misuse. This suggests that regulatory interventions can promote appropriate prescribing which could potentially be applied to other jurisdictions and drugs of concern. PMID:25485251

  18. Nevada Risk Assessment/Management Program scientific peer review

    International Nuclear Information System (INIS)

    Bentz, E.J. Jr.; Bentz, C.B.; O'Hora, T.D.; Chen, S.Y.

    1997-01-01

    The 1,350 square-mile Nevada Test Site and additional sites in Nevada served as the continental sites for US nuclear weapons testing from 1951 to 1992. The Nevada Risk Assessment/Management Program (NRAMP) is a currently on-going effort of the Harry Reid Center for Environmental Studies at the University of Nevada, Las Vegas (UNLV) and the firm of E. J. Bentz and Associates, Inc., in cooperation with the US Department of Energy (DOE) Environmental Management Program. Argonne National Laboratory is one of several public and private organizations supporting personnel appointed by the NRAMP to the NRAMP Scientific Peer Review Panel. The NRAMP is part of a national effort by the DOE to develop new sources of information and approaches to risk assessment, risk management, risk communication, and public outreach relevant to the ecological and human health effects of radioactive and hazardous materials management and site remediation activities. This paper describes the development, conduct, and current results of the scientific peer review process which supports the goals of the NRAMP

  19. The Carlsbad Environmental Monitoring and Research Center: An independent program for community information

    International Nuclear Information System (INIS)

    Fingleton, Donald J.; Bhada, Ron K.; Derald Morgan, J.; Julien, Howard

    1992-01-01

    The Waste Isolation Pilot Plant (WIPP) was designed and built as a research and development facility to obtain data to demonstrate the safe management, storage, and disposal of defense-related transuranic (TRU) waste. The WIPP facility, near Carlsbad, New Mexico, is scheduled to receive its first shipment of TRU waste in 1992. The citizens of Carlsbad requested the U.S. Department of Energy (DOE) to provide them with an independent organization that would monitor the entire area with state-of-the-art monitoring techniques and publish the data. As a follow-up, the DOE approved a proposal from the Waste-management Education and Research Consortium of New Mexico to develop and implement this program. The purpose of this paper is to (1) describe this innovative program to establish the Carlsbad Environmental Monitoring and Research Center, an independent university based center to study health and environmental impacts associated with technological development; (2) present the Center's mission and objectives; and (3) give an overview of the progress. (author)

  20. Rational risk-based decision support for drinking water well managers by optimized monitoring designs

    Science.gov (United States)

    Enzenhöfer, R.; Geiges, A.; Nowak, W.

    2011-12-01

    Advection-based well-head protection zones are commonly used to manage the contamination risk of drinking water wells. Considering the insufficient knowledge about hazards and transport properties within the catchment, current Water Safety Plans recommend that catchment managers and stakeholders know, control and monitor all possible hazards within the catchments and perform rational risk-based decisions. Our goal is to supply catchment managers with the required probabilistic risk information, and to generate tools that allow for optimal and rational allocation of resources between improved monitoring versus extended safety margins and risk mitigation measures. To support risk managers with the indispensable information, we address the epistemic uncertainty of advective-dispersive solute transport and well vulnerability (Enzenhoefer et al., 2011) within a stochastic simulation framework. Our framework can separate between uncertainty of contaminant location and actual dilution of peak concentrations by resolving heterogeneity with high-resolution Monte-Carlo simulation. To keep computational costs low, we solve the reverse temporal moment transport equation. Only in post-processing, we recover the time-dependent solute breakthrough curves and the deduced well vulnerability criteria from temporal moments by non-linear optimization. Our first step towards optimal risk management is optimal positioning of sampling locations and optimal choice of data types to reduce best the epistemic prediction uncertainty for well-head delineation, using the cross-bred Likelihood Uncertainty Estimator (CLUE, Leube et al., 2011) for optimal sampling design. Better monitoring leads to more reliable and realistic protection zones and thus helps catchment managers to better justify smaller, yet conservative safety margins. In order to allow an optimal choice in sampling strategies, we compare the trade-off in monitoring versus the delineation costs by accounting for ill