WorldWideScience

Sample records for risk management planning

  1. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  2. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  3. Tank waste remediation system programmatic risk management plan

    International Nuclear Information System (INIS)

    Seaver, D.A.

    1995-01-01

    This risk management plan defines the approach to be taken to managing risks in the Tank Waste Remediation System (TWRS) program. It defines the actions to be taken at the overall program level, and the risk management requirements for lower-level projects and other activities. The primary focus of this plan is on ''programmatic'' risks, i.e., risks with respect to the cost, schedule, and technical performance of the program. The plan defines an approach providing managers with the flexibility to manage risks according to their specific needs, yet creates. The consistency needed for effectiveness across the program. The basic risk management approach uses a risk management list for the program, each project, and additional lower-level activities. The risk management list will be regularly reviewed and updated by appropriate level of management. Each list defines key risks, their likelihood and consequences, risk management actions to be taken, responsible individuals, and other management information

  4. Evaluating risk management strategies in resource planning

    International Nuclear Information System (INIS)

    Andrews, C.J.

    1995-01-01

    This paper discusses the evaluation of risk management strategies as a part of integrated resource planning. Value- and scope-related uncertainties can be addressed during the process of planning, but uncertainties in the operating environment require technical analysis within planning models. Flexibility and robustness are two key classes of strategies for managing the risk posed by these uncertainties. This paper reviews standard capacity expansion planning models and shows that they are poorly equipped to compare risk management strategies. Those that acknowledge uncertainty are better at evaluating robustness than flexibility, which implies a bias against flexible options. Techniques are available to overcome this bias

  5. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  6. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  7. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  8. The flood risk management plan: towards spatial water governance

    NARCIS (Netherlands)

    Hartmann, T.; Driessen, P.

    2017-01-01

    The flood risk management plan challenges both water engineers and spatial planners. It calls for a new mode of governance for flood risk management. This contribution analyses how this mode of governance distinguishes from prevalent approaches. Spatial planning and water management in Europe are

  9. Therapeutic risk management of the suicidal patient: safety planning.

    Science.gov (United States)

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  10. [Post-marketing drug safety-risk management plan(RMP)].

    Science.gov (United States)

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  11. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  12. Risk management plan for the National Ignition Facility

    International Nuclear Information System (INIS)

    Brereton, S.; Lane, M.; Smith, C.; Yatabe, J.

    1998-01-01

    The National Ignition Facility (NIF) is a U.S. Department of Energy inertial confinement laser fusion facility, currently under construction at the Lawrence Livermore National Laboratory (LLNL). NIF is a critical tool for the Department of Energy (DOE) science- based Stockpile Stewardship and Management Program. In addition, it represents a major step towards realizing inertial confinement fusion as a source of energy. The NIF will focus 192 laser beams onto spherical targets containing a mixture of deuterium and tritium, causing them to implode. This will create the high temperatures and pressures necessary for these targets to undergo fusion. The plan is for NIF to achieve ignition (i.e., self-heating of the fuel) and energy gain (i.e., more fusion energy produced than laser energy deposited) in the laboratory for the first time. A Risk Management Plan was prepared for the NIF design and construction Project. The plan was prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide. The objectives of the plan were to: (1) identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule, (2) assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES ampersand H (environment, safety and health), costs, and schedule, and (3) address each risk in terms of suitable risk management measures. Major risk elements were identified for the NIF Project. A risk assessment methodology was developed, which was utilized to rank the Project risks with respect to one another. Those elements presenting greater risk were readily identified by this process. This paper describes that methodology and the results

  13. ASME nuclear codes and standards risk management strategic planning

    International Nuclear Information System (INIS)

    Hill, Ralph S. III; Balkey, Kenneth R.; Erler, Bryan A.; Wesley Rowley, C.

    2007-01-01

    This paper is prepared in honor and in memory of the late Professor Emeritus Yasuhide Asada to recognize his contributions to ASME Nuclear Codes and Standards initiatives, particularly those related to risk-informed technology and System Based Code developments. For nearly two decades, numerous risk-informed initiatives have been completed or are under development within the ASME Nuclear Codes and Standards organization. In order to properly manage the numerous initiatives currently underway or planned for the future, the ASME Board on Nuclear Codes and Standards (BNCS) has an established Risk Management Strategic Plan (Plan) that is maintained and updated by the ASME BNCS Risk Management Task Group. This paper presents the latest approved version of the plan beginning with a background of applications completed to date, including the recent probabilistic risk assessment (PRA) standards developments for nuclear power plant applications. The paper discusses planned applications within ASME Nuclear Codes and Standards that will require expansion of the ASME PRA Standard to support new advanced light water reactor and next generation reactor developments, such as for high temperature gas-cooled reactors. Emerging regulatory developments related to risk-informed, performance- based approaches are summarized. A long-term vision for the potential development and evolution to a nuclear systems code that adopts a risk-informed approach across a facility life-cycle (design, construction, operation, maintenance, and closure) is also summarized. Finally, near term and long term actions are defined across the ASME Nuclear Codes and Standards organizations related to risk management, including related U.S. regulatory activities. (author)

  14. Danish risk management plans of the EU Floods Directive

    DEFF Research Database (Denmark)

    Jebens, Martin; Sørensen, Carlo Sass; Piontkowitz, Thorsten

    2016-01-01

    We evaluate the impact and effect of the EU Flood’s Directive (2007/60/EC) in Denmark and the flood risk management plans that are the result of the national implementation. In a qualitative research approach, the flood risk management plans published by 22 Danish municipalities are reviewed...... and analyzed regarding main objectives and structural and non-structural mitigation measures. From the analyses conclusions are drawn on the non-structural risk management measures still to be improved to obtain the full benefits from the Directive. Conclusions point to the need of introducing better decision...... and cross-sectorial working platform for dealing with risks from floods....

  15. Integrated Waste Treatment Unit GFSI Risk Management Plan

    International Nuclear Information System (INIS)

    W. A. Owca

    2007-01-01

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP)

  16. Tank waste remediation system tank waste retrieval risk management plan

    International Nuclear Information System (INIS)

    Klimper, S.C.

    1997-01-01

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure

  17. National Ignition Facility risk management plan, rev. 1

    International Nuclear Information System (INIS)

    Brereton, S J; Lane, M A

    1998-01-01

    The initial release of the National Ignition Facility (AUF) Risk Management Plan (LLNL, 1997a) was prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide (DOE, 1996a) and supported Critical Decision 3 (CD3), Approval to Initiate Construction (DOE, 1997a). The objectives of the plan were to: (1) Identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule. (2) Assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES and H (environmental, safety and health), costs, and schedule. (3) Address suitable risk mitigation measures for each identified risk. This revision of the Risk Management Plan considers project risks and vulnerabilities after CD3 (DOE, 1997a) was approved by the Secretary of Energy. During the one-year period since the initial release, the vulnerabilities of greatest concern have been the litigation of the Programmatic Environmental Impact Statement (PEIS) (DOE, 1996b) by a group of environmental organizations led by the Natural Resources Defense Council; the finding and successful clean-up of polychlorinated biphenyl (PCB)-filled electrical capacitors at the NIF site excavation; the FY98 congressional budget authorization and request for the FY99 budget authorization; funding for Inertial Confinement Fusion (ICF)/NIF programmatic activities (including French and other sources of funding); and finally, progress in the core science and technology, and optics program that form the basis for the NIF design

  18. Risk management plans as a tool for proactive pharmacovigilance

    DEFF Research Database (Denmark)

    Vermeer, N S; Duijnhoven, R G; Straus, S M J M

    2014-01-01

    Risk Management Plans (RMPs) have become a cornerstone in the pharmacovigilance of new drugs in Europe. The RMP was introduced in 2005 to support a proactive approach in gaining knowledge on safety concerns through early planning of pharmacovigilance activities. However, the rate at which...... of uncertainties, suggests that opportunities for optimization exist while ensuring feasible and risk-proportionate pharmacovigilance planning....

  19. Risk management and disaster recovery planning for online libraries.

    Science.gov (United States)

    Uzwyshyn, Ray

    2015-01-01

    This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.

  20. Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314

  1. Danish risk management plans of the EU Floods Directive

    Directory of Open Access Journals (Sweden)

    Jebens Martin

    2016-01-01

    Full Text Available We evaluate the impact and effect of the EU Flood’s Directive (2007/60/EC in Denmark and the flood risk management plans that are the result of the national implementation. In a qualitative research approach, the flood risk management plans published by 22 Danish municipalities are reviewed and analyzed regarding main objectives and structural and non-structural mitigation measures. From the analyses conclusions are drawn on the non-structural risk management measures still to be improved to obtain the full benefits from the Directive. Conclusions point to the need of introducing better decision support systems, a need to define acceptable risks, and a need to enhance coordi-nation between municipal and cross-sectorial actors as well as an increased effort to involve civil society is necessary. In general, the implementation of the Directive has significantly advanced the national scientific and cross-sectorial working platform for dealing with risks from floods.

  2. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Urban, Mary Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Process Modeling and Analysis Group

    2016-05-02

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, and monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.

  3. Risk Management Plan (RMP) Facility Points, Region 9, 2011, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Risk Management Plan (RMP): Under the Clean Air Act, Section 112(r), the EPA established a program requiring risk management plans to be provided to the EPA by...

  4. Risk Management Plan (RMP) Facility Points, Region 9, 2014, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Risk Management Plan (RMP): Under the Clean Air Act, Section 112(r), the EPA established a program requiring risk management plans to be provided to the EPA by...

  5. Protection planning and risk management at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Hunt, J.S.; Altman, W.D.; Hockert, J.W.

    1988-01-01

    Effective safeguards and security management begins with comprehensive strategic planning that synthesizes protection objectives, threat information, existing protection capabilities, consequences of protection failure, and the costs and impacts of safeguards changes into cost effective protection strategies that adequately address credible threats. Lawrence Livermore National Laboratory (LLNL) has developed a structured risk management approach to safeguards and security planning that is designed to lead to protection strategies that are cost effective, meet the intent of Department of Energy (DOE) orders, balance protection needs with programmatic priorities, and acknowledge a level of residual risks that is not cost effective to eliminate. This risk management approach to safeguards decision making was used to develop the first DOE-approved Master Safeguards and Security Agreement (MSSA) that addresses all security interests at a major facility including: special nuclear material, classified information and materials, computer and communication security, and other DOE property. This risk management approach also provides the strategic basis for day-to-day management of the LLNL security program as well as the integration of safeguards program upgrades

  6. ASME nuclear codes and standards risk management strategic plan

    International Nuclear Information System (INIS)

    Balkey, Kenneth R.

    2003-01-01

    Over the past 15 years, several risk-informed initiatives have been completed or are under development within the ASME Nuclear Codes and Standards organization. In order to better manage the numerous initiatives in the future, the ASME Board on Nuclear Codes and Standards has recently developed and approved a Risk Management Strategic Plan. This paper presents the latest approved version of the plan beginning with a background of applications completed to date, including the recent issuance of the ASME Standard for Probabilistic Risk Assessment (PRA) for Nuclear Power Plant Applications. The paper discusses potential applications within ASME Nuclear Codes and Standards that may require expansion of the PRA Standard, such as for new generation reactors, or the development of new PRA Standards. A long-term vision for the potential development and evolution to a nuclear systems code that adopts a risk-informed approach across a facility life-cycle (design, construction, operation, maintenance, and closure) is summarized. Finally, near term and long term actions are defined across the ASME Nuclear Codes and Standards organizations related to risk management, and related U.S. regulatory activities are also summarized. (author)

  7. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  8. Constructing risks – Internalisation of flood risks in the flood risk management plan

    NARCIS (Netherlands)

    Roos, Matthijs; Hartmann, T.; Spit, T.J.M.; Johann, Georg

    Traditional flood protection methods have focused efforts on different measures to keep water out of floodplains. However, the European Flood Directive challenges this paradigm (Hartmann and Driessen, 2013). Accordingly, flood risk management plans should incorporate measures brought about by

  9. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  10. General RMP Guidance - Chapter 9: Risk Management Plan

    Science.gov (United States)

    You must submit one risk management plan (RMP) to EPA for all of your covered processes. The internet-based RMP*eSubmit allows you to submit your RMP in EPA's Central Data Exchange (CDX), where you can access and change/correct existing RMPs.

  11. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  12. Risk management

    OpenAIRE

    Mcmanus, John

    2009-01-01

    Few projects are completed on time, on budget, and to their original requirement or specifications. Focusing on what project managers need to know about risk in the pursuit of delivering projects, Risk Management covers key components of the risk management process and the software development process, as well as best practices for risk identification, risk planning, and risk analysis. The book examines risk planning, risk analysis responses to risk, the tracking and modelling of risks, intel...

  13. Collaborative multi-stakeholder approach to drafting flood risk management plans in Wallonia, Belgium

    Science.gov (United States)

    Maroy, Edith; Javaux, Mathieu; Vandermosten, Pierre; Englebert, Benjamin

    2015-04-01

    The Flood Directive 2007/60/CE establishes a common framework within the European Union for assessing and reducing risks posed by floods on human health, the environment, economic activity and cultural heritage. For that purpose, Member States had to establish flood areas and flood risk maps, and subsequently, flood risk management plans (due December 2015). According to the Directive, special attention is to be paid to international coordination for transboundary water courses, integrated management approaches at the catchment scale, cost-effectiveness of measures and public involvement. Management measures must focus on reducing the probability of flooding and the potential consequences of flooding. They must cover prevention, protection and preparedness and must take into account relevant aspects, such as water management, soil management, spatial planning, land use and nature conservation. Floods in Wallonia mostly originate from overflowing of both little sloped rivers and highly reactive rivers but also, from concentrated runoff in the intensely cultivated and erosion-prone region north of the Sambre-Meuse axis. Consequently, walloon flood area maps not only show flood areas based on hydraulic modelling and observations but also runoff concentration axis in agricultural areas. Now released to the public, this information can be used to assess the risk of damage for land planning and erosion control strategies. Incidentally, some 166 km2 were mapped as flood hazard area with a return period of 25 years, 28.8 of which are urbanized or destined to urbanisation and counting of number of approximatively 39.000 people living in those areas. Flood area and flood risk maps should be the starting point of elaborating flood risk management plans. In order to involve the diversity of water managers and stakeholders in the drafting of a management plan for hydrographic districts in Wallonia, responsible authorities decided to mandate scientists and engineers to organize

  14. Holistic Disaster Risk Evaluation for the Urban Risk Management Plan of Manizales, Colombia

    Institute of Scientific and Technical Information of China (English)

    Martha Liliana Carre(n)o; Omar-Darío Cardona; Alex H.Barbat; Dora Catalina Suarez; María del Pilar Perez; Lizardo Narvaez

    2017-01-01

    Disaster risk depends on both the physical vulnerability and a wide range of social,economic,and environmental aspects of a society.For a better risk understanding,a holistic or integrated perspective was considered when risk was assessed for the city of Manizales,Colombia.This assessment accounts not only for the expected physical damage and loss,but also for the socioeconomic vulnerability factors that favor secondorder effects in a disaster.This comprehensive approach allows the identification of different aspects related to physical vulnerability,social fragility,and lack of resilience that can be improved,thus enhancing integrated disaster risk management actions.The outcomes of this comprehensive assessment are currently being used as input to update the disaster risk management plan of Manizales.

  15. NGNP Risk Management Database: A Model for Managing Risk

    International Nuclear Information System (INIS)

    Collins, John

    2009-01-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft(reg s ign) Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool's design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  16. NGNP Risk Management Database: A Model for Managing Risk

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  17. Packaging and transportation risk management and evaluation plan

    International Nuclear Information System (INIS)

    Rhyne, W.R.

    1993-09-01

    Shipments of radioactive materials and hazardous chemicals at the Los Alamos National Laboratory (LANL) are governed by a variety of Federal and state regulations, industrial standards, and LANL processes and procedures. Good judgement is exercised in situations that are not covered by regulations. As a result, the safety record for transporting hazardous materials at LANL has been excellent. However, future decisions should be made such that the decision-making process produces a defensible record of the safety of onsite shipments. This report proposes the development of a risk management tool to meet this need. First, the application of quantitative risk analysis methodology to transportation is presented to provide a framework of understanding. Risk analysis definitions, the basic quantitative risk analysis procedure, quantitative methodologies, transportation data bases, and risk presentation techniques are described. Quantitative risk analysis is frequently complex; but simplified approaches can be used as a management tool to make good decisions. Second, a plan to apply the use of risk management principles to the selection of routes, special administrative controls, and containers for hazardous material transportation at LANL is provided. A risk management tool is proposed that can be used by MAT-2 without substantial support from specialized safety and risk analysis personnel, e.g., HS-3. A workbook approach is proposed that can be automated at a later date. The safety of some types of onsite shipments at LANL is not well documented. Documenting that shipments are safe, i.e., present acceptable risks, will likely require elaborate analyses that should be thoroughly reviewed by safety and risk professionals. These detailed analyses are used as benchmarks and as examples for the use of the proposed tool by MAT-2. Once the benchmarks are established, the workbook can be used by MAT-2 to quantify that safety goals are met by similar shipments

  18. Risk management frameworks: supporting the next generation of Murray-Darling Basin water sharing plans

    Directory of Open Access Journals (Sweden)

    G. M. Podger

    2014-09-01

    Full Text Available Water jurisdictions in Australia are required to prepare and implement water resource plans. In developing these plans the common goal is realising the best possible use of the water resources – maximising outcomes while minimising negative impacts. This requires managing the risks associated with assessing and balancing cultural, industrial, agricultural, social and environmental demands for water within a competitive and resource-limited environment. Recognising this, conformance to international risk management principles (ISO 31000:2009 have been embedded within the Murray-Darling Basin Plan. Yet, to date, there has been little strategic investment by water jurisdictions in bridging the gap between principle and practice. The ISO 31000 principles and the risk management framework that embodies them align well with an adaptive management paradigm within which to conduct water resource planning. They also provide an integrative framework for the development of workflows that link risk analysis with risk evaluation and mitigation (adaptation scenarios, providing a transparent, repeatable and robust platform. This study, through a demonstration use case and a series of workflows, demonstrates to policy makers how these principles can be used to support the development of the next generation of water sharing plans in 2019. The workflows consider the uncertainty associated with climate and flow inputs, and model parameters on irrigation and hydropower production, meeting environmental flow objectives and recreational use of the water resource. The results provide insights to the risks associated with meeting a range of different objectives.

  19. Risk management.

    Science.gov (United States)

    Chambers, David W

    2010-01-01

    Every plan contains risk. To proceed without planning some means of managing that risk is to court failure. The basic logic of risk is explained. It consists in identifying a threshold where some corrective action is necessary, the probability of exceeding that threshold, and the attendant cost should the undesired outcome occur. This is the probable cost of failure. Various risk categories in dentistry are identified, including lack of liquidity; poor quality; equipment or procedure failures; employee slips; competitive environments; new regulations; unreliable suppliers, partners, and patients; and threats to one's reputation. It is prudent to make investments in risk management to the extent that the cost of managing the risk is less than the probable loss due to risk failure and when risk management strategies can be matched to type of risk. Four risk management strategies are discussed: insurance, reducing the probability of failure, reducing the costs of failure, and learning. A risk management accounting of the financial meltdown of October 2008 is provided.

  20. Guidelines for developing NASA (National Aeronautics and Space Administration) ADP security risk management plans

    Science.gov (United States)

    Tompkins, F. G.

    1983-01-01

    This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.

  1. Data Management in Metagenomics: A Risk Management Approach

    Directory of Open Access Journals (Sweden)

    Filipe Ferreira

    2014-07-01

    Full Text Available In eScience, where vast data collections are processed in scientific workflows, new risks and challenges are emerging. Those challenges are changing the eScience paradigm, mainly regarding digital preservation and scientific workflows. To address specific concerns with data management in these scenarios, the concept of the Data Management Plan was established, serving as a tool for enabling digital preservation in eScience research projects. We claim risk management can be jointly used with a Data Management Plan, so new risks and challenges can be easily tackled. Therefore, we propose an analysis process for eScience projects using a Data Management Plan and ISO 31000 in order to create a Risk Management Plan that can complement the Data Management Plan. The motivation, requirements and validation of this proposal are explored in the MetaGen-FRAME project, focused in Metagenomics.

  2. DOE-EM privatization and the 2006 Plan: Principles for procurement policies and risk management

    International Nuclear Information System (INIS)

    Bjornstad, D.J.; Jones, D.W.; Duemmer, C.L.

    1997-01-01

    The Department of Energy's Office of Environmental Remediation and Waste Management (EM) has recently set in place programs to restructure the strategic planning mechanism that will drive its clean-up schedule, The 2006 Plan, and to create a new set of business relationships with private contractors that will reduce costs--privatization. Taken together, the 2006 Plan and privatization will challenge EM to create new business practices to recast its risk management policies to support these initiatives while ensuring that its responsibilities toward the environment, human health, and worker safety (ES and H) are maintained. This paper argues that the 2006 Plan has transformed EM's traditional, bottoms-up approach based on technical dictates to a top-down approach based on management goals--a transformation from an engineering problem to an economic problem. The 2006 Plan evolved from EM's Ten-Year Plan, and seeks to convert the largely open-ended planning approach previously undertaken by EM to a plan bounded by time and dollars. The plan emphasizes making tradeoffs and choosing activities that deliver the most clean-up for the dollar. It also recognizes that each major player--stakeholders, DOE, OMB and Congress--has distinct interests that must be resolved if the process is to succeed. This, in turn, has created the need for a corresponding transformation in risk management practices from compliance-driven to benefit/cost-driven

  3. National action plan 2016-2019 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Mortureux, Marc; Vallet, Benoit; Struillou, Yves; Girometti, Laurent

    2017-01-01

    After a brief presentation of the context, and a presentation of aspects related to the plan governance and strategies (plan steering, actors in the radon risk management, synthesis of main actions in France, regulatory evolutions and new strategies), this report presents the three axes of the national action plan for 2016-2019. The first one consists in the implementation of a global strategy of information and in developing tools to collect and share information. The second one consists in a continuous knowledge improvement. The third one consists in a better taking into account of radon risk management in buildings. Sheets are then proposed which describe the various actions associated with these axes (5 actions for the first one, 10 for the second, and 5 for the third one). Each sheet comprises the action title, its objectives, methods and tools, its coordinator and actors, its agenda and current status

  4. 2011-2015 National action plan for the management of radon-related risk

    International Nuclear Information System (INIS)

    2011-01-01

    After an assessment of the 2005-2008 action plan, this report presents the 2011-2015 plan. It comprises five main axis: the implementation of a policy regarding the management of the radon-related risk in existing dwellings, the implementation of a regulation for new dwellings, the follow-up of the regulation regarding public places and that applicable to workers, the development and the implementation of new management tools for the diagnosis of buildings and works performed by professionals, and the coordination of policy regarding investigation and research. Each axis comprises several actions which are defined and presented. Eight key measures are also defined

  5. Use of risk assessment panels during revision of the Tongass Land and Resource Management Plan.

    Science.gov (United States)

    Charles G. Shaw

    1999-01-01

    This paper describes the process used to conduct the 16 risk assessment panels and a subsistence working group held during revision of the Tongass land management plan. It provides an overview of how results from the panels were used by forest managers in plan-related decisionmaking, discusses some reactions to the effort, and identifies some opportunities to improve...

  6. Risk management in power generation and trading planning with financial instruments; Risikomanagement fuer Stromerzeugungs- und Handelsunternehmen mit Finanzinstrumenten

    Energy Technology Data Exchange (ETDEWEB)

    Blaesig, B.; Huebner, M.; Hinueber, G.; Haubrich, H.J. [Technische Hochschule Aachen (Germany). Lehrstuhl und Inst. fuer Elektrische Anlagen und Energiewirtschaft

    2006-04-15

    Volatile prices in the electric power trade and varying customers' acceptance increasingly set the companies under competitive pressure and cause planning uncertainties on the producer side. In order to justice to the changed requirements in the energy economy, new methods for a systematic risk management must be developed within planning. On the basis of power generation planning and a commercial planning the authors of the contribution under consideration report on the development of a risk management with financial instruments.

  7. Between tradition and innovation : Developing Flood Risk Management Plans in the Netherlands

    NARCIS (Netherlands)

    Jong, Pieter; Brink, Margo Van Den

    2013-01-01

    Traditionally, governmental authorities in the Netherlands have a strong focus on the construction and maintenance of flood defences, such as dikes and dams. The last decades, however, there has been a growing awareness of the importance of spatial planning for flood risk management. With the

  8. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    Science.gov (United States)

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  10. Managing risks and hazardous in industrial operations

    Energy Technology Data Exchange (ETDEWEB)

    Almaula, S.C. [Woodward-Clyde International, Oakland, CA (United States)

    1996-12-31

    The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 to $200,000. 3 refs., 2 figs., 1 tab.

  11. Risk Management in Mergers and Acquisitions

    Directory of Open Access Journals (Sweden)

    Dmitry O. Verdiev

    2015-01-01

    Full Text Available M&A statistics show that less than a third of newly merged companies has realized their planned synergistic effects and increased shareholder value. According to the author, such disgusting situation is due to improper planning and failure of corporate management to understand the importance of risk management in M&A. Lack of practice in identification, evaluation, mitigation and regular monitoring of risks leads to the situation when many companies merge despite the fact that the merger bears substantial risks. Corporate management fails to include risk mitigation expenses in merger costs. In many cases, risk mitigation expenses may be so substantive that the merger loses its attractiveness. Only few companies implement risk management methodology while planning M&A activity. This methodology may anticipate and minimize the consequences of various risk factors that negatively influence integration process. The article suggests an implementation of risk management best practice. This risk management best practice may act as an effective tool of successful realization of synergistic effects in M&A and may be helpful in increasing shareholder value in post-merger period. Risk management is conducted throughout the stages of merger and includes identification, analysis, assessment, management and monitoring of risks. Implementation of risk management at early stages of merger planning significantly decreases uncertainty in relation to achievement of financial and operational goals of newly merged company. The article provides with typical M&A risk matrix that may be adapted for specific M&A project. Risk matrix includes a register of risks sorted by stages of M&A deal, quality assessment of their probability, influence and impact on merger as well as risk mitigation methods.

  12. Crisis planning to manage risks posed by animal rights extremists.

    Science.gov (United States)

    Bailey, Matthew R; Rich, Barbara A; Bennett, B Taylor

    2010-01-01

    Among the multitude of crises that US research institutions may face are those caused by animal rights activists. While most activists opposed to animal research use peaceful and lawful means of expressing their opinions, some extremists resort to illegal methods. Arson, break-ins, and theft with significant property damage at US animal research facilities began in the 1980s. The most troubling trend to develop in the past decade is the targeting of individuals associated with animal research, whether directly or indirectly, and the use of violent scare tactics to intimidate researchers and their families. The National Association for Biomedical Research has a 30-year history of monitoring the animal rights movement and assisting member institutions with crisis situations. In this article we discuss attacks on researchers at their homes, cyber crimes, exploitation of new media formats, infiltration of research facilities, and the targeting of external research stakeholders and business partners. We describe the need for a well-conceived crisis management plan and strong leadership to mitigate crisis situations. Institutions with well-informed leaders and crisis management teams ready to take timely action are best equipped to protect staff, laboratory animals, and research programs. They act on early warnings, provide support for targeted staff, seek legal remedies, thoughtfully control access to research facilities, and identify and enlist new research supporters. We underscore the importance of up-to-date crisis planning so that institutions are not only aware of ongoing risks posed by animal rights extremists but also better prepared to take preemptive action and able to manage those risks successfully.

  13. How costly is it to ignore interest rate risk management in your 401(k) plan?

    NARCIS (Netherlands)

    van Bilsen, Servaas; Boelaars, I.; Bovenberg, Lans; Mehlkopf, Roel

    This paper explicitly derives and explores optimal interest rate risk management for lifecycle investors in DC pension plans, and compares our results to the portfolio mix chosen in practice by Target-Date Fund (TDF) managers. We show that investments in long-term bonds play an important role in the

  14. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  15. Fundamentals of risk management understanding, evaluating and implementing effective risk management

    CERN Document Server

    Hopkin, Paul

    2012-01-01

    Now more than ever, organizations must plan, response and recognize all forms of risks that they face. "Fundamentals of Risk Management", now in its second edition, provides a comprehensive introduction to the subject of commercial and business risk for anyone studying for a career in risk as well as a broad range of risk professionals. It examines the key components of risk management and its application with examples to demonstrate its benefit to organisations in the public and private sector. The second edition has been completely updated to take into account the greater influence of ISO 3100, the emergence of Governance Risk and Compliance (GRC) and the wide use of the bowtie method to illustrate risk management. In addition, there is now a chapter on the skills and competencies required by an effective risk manager.

  16. National action plan 2011-2015 for the management of the radon-related risk. Assessment of the National action plan 2011-2015 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Grall, Jean-Yves; Crepon, Etienne; Combrexelle, Jean-Denis; Niel, Jean-Christophe

    2011-01-01

    After a presentation of the context, and a brief assessment of the previous national action plan (2005-2008), a first report presents the second national action plan for 2011-2015 with its 8 main axes (implementation of a policy for the management of radon-related risk in existing dwellings, implementation of a regulation for new dwellings, follow-up of the regulation for buildings open to public and of the regulations applied to workers, development of new management tools and of a new operational device to perform building diagnosis and to perform works by building professionals, coordination of the study and research policy) and its 8 main measures. After a synthetic presentation of actions, 30 sheets present the different actions associated with each axis. A second report proposes an assessment of these 30 actions

  17. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  18. The application of holistic risk management in the banking industry

    Directory of Open Access Journals (Sweden)

    J. Chibayambuya

    2007-12-01

    Full Text Available Purpose: The application of holistic risk management is fast becoming a standard measure of good governance in the business arena. What role can holistic risk management play in the management of risk in the financial services industry? The aim of this paper is to propose a holistic risk management framework for the management of risk. Design/Methodology/Approach: A comprehensive framework that covers the holistic view risk management is proposed/developed out of an extensive literature review. Findings: Given the deliberations of various frameworks, a holistic risk management is proposed. The proposed framework ensures that all components of risk management are taken into account when strategizing for risk management in general and holistic risk management in particular; thereby improving the management of risk in the banking industry. Implications: The article proposes a holistic approach to risk management which takes into account all the facets of risk management, e.g. analyzing, planning, strategy, communication, implementation, motivation, systems review and plan modification. This holistic approach, when implemented in the banking industry, can have a significant impact on the improved management of risk. Originality/Value: The new proposed holistic risk management framework offers a fresh perspective of strategizing for risk management in terms of risk analysis, risk planning, risk strategy, risk communication, risk implementation, risk motivation, risk review and risk plan modification.

  19. Integrating fire behavior models and geospatial analysis for wildland fire risk assessment and fuel management planning

    Science.gov (United States)

    Alan A. Ager; Nicole M. Vaillant; Mark A. Finney

    2011-01-01

    Wildland fire risk assessment and fuel management planning on federal lands in the US are complex problems that require state-of-the-art fire behavior modeling and intensive geospatial analyses. Fuel management is a particularly complicated process where the benefits and potential impacts of fuel treatments must be demonstrated in the context of land management goals...

  20. Integrating Risk Management and Strategic Planning

    Science.gov (United States)

    Achampong, Francis K.

    2010-01-01

    Strategic planning is critical to ensuring that institutions of higher education thoughtfully and systematically position themselves to accomplish their mission, vision, and strategic goals, particularly when these institutions face a myriad of risks that can negatively impact their continued financial viability and compromise their ability to…

  1. Risk management in facility transition and management decision making: Needs and opportunities

    International Nuclear Information System (INIS)

    Stillwell, W.; Seaver, D.; Keller, J.; Smith, D.; Weaver, D.; Sanders, T.; Thullen, P.

    1993-02-01

    An overall approach to risk management is described in this paper. Many of these concepts have been developed and applied as part of Hanford Mission Planning (HMP) (Hanford Mission Plan, 1992). At Hanford, HMP provides a mechanism for integrating planning across all the missions and programs of the site. This paper discusses the decision context within which EM must make and defend decisions, the types of decisions that are being and will need to be made in order to progress with the cleanup of the DOE complex, and the resulting need for risk management. Risk management, in turn, requires quality health and ecological risk information to make these decisions. Other types of information are also needed, but the risk information is typically the most important and the most difficult to obtain. The paper then describes a general technical approach to risk management, including particular methods for developing the high quality of human health and ecological risk information that will be needed to support risk management. We next turn to several special issues that make risk management more complex than many other decisions. We discuss these issues and offer some practical suggestions with respect to addressing them in the risk management framework. Finally, we conclude with some discussion of other opportunities for applying risk management

  2. 42 CFR 441.476 - Risk management.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  3. State-of-the-art risk-based approach to spill contingency planning and risk management

    International Nuclear Information System (INIS)

    Schmidt Etkin, Dagmar; Reilly, Timothy; French McCay, Deborah

    2011-01-01

    The paper proposes incorporating a comprehensive examination of spill risk into risk management and contingency planning, and applying state-of-the-art modeling tools to evaluate various alternatives for appropriate spill response measures and optimize protective responses. The approach allows spill contingency planners and decision-makers to determine the types of spill scenarios that may occur in a particular location or from a particular source and calculate the probability distribution of the various scenarios. The spill probability information is useful in assessing and putting into perspective the various costs options for spill control systems that will be recommended ultimately. Using advanced modeling tools helps in estimating the potential environmental and socioeconomic consequences of each spill scenario based on location-specific factors over a range of stochastic possibilities, simulating spill scenarios and determining optimal responses and protection strategies. The benefits and costs of various response alternatives and variations in response time can be calculated and modeling tools for training and risk allocation/transfer purposes used.

  4. Hanford Tanks Initiative risk management guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    This project-specific Risk Management Guide describes the general approach and process being used by the HTI Project to manage risk associated with execution of the HTI mission. It includes the initial identification of risk and the quantification of its likelihood and severity of its consequences. It further addresses the formulation of risk mitigation plans, periodic statusing of the Risk Management List, and risk closure

  5. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  6. 12 CFR 932.1 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  7. Risk Management for Enterprise Resource Planning Post Implementation Using COBIT 5 for Risk

    OpenAIRE

    Indah, Dwi Rosa; Harlili, Harlili; Firdaus, Afriyan

    2014-01-01

    Risk management for ERP postimplementation is required to achieve ERP success. In this paper, risk management for ERP postimplementation is designed using COBIT 5 for Risk on APO12 processes. The design of a risk management framework begins with assessment of ERP postimplementation success adopting two approaches, namely the framework of ERP post-implementation success and Critical Success Factor of ERP post-implementation as an input to the risk identification adopted from COBIT 5 for Risk. ...

  8. Study on Flood Management Plan in Surabaya City

    Directory of Open Access Journals (Sweden)

    Anton Dharma Pusaka Mas

    2015-05-01

    Full Text Available The area alongside the Gunung Sari Channel has an important meaning to the development of Surabaya City. The rising development in this area which causes the increase of flood events induces negative impacts on the growth of Surabaya City. The flood management plan in Gunung Sari Channel has been conducted by Brantas Project since 1988. This planning was reviewed in 1993 and 1999. This research was conducted to analyze the performance of flood management plan by Brantas Project. It was constructively done by HEC-FDA Software which can develop risk analysis by including economic consideration. Hydro-Economy approach integrated with the HEC-FDA analysis can yield the indicator of flood management plan performance in the form of total cost and risk cost (Expected Annual Damage/EAD. The best total cost yielded from the analysis was Rp. 893,692,230, while the risk cost was Rp. 384,238,410/year. It is expected that this research result can used for achieving best performance for floods management in Gunung Sari Channel.

  9. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  10. Individual Property Risk Management

    Directory of Open Access Journals (Sweden)

    Michael S. Finke

    2010-01-01

    Full Text Available This paper reviews household property risk management and estimates normatively optimal choice under theoretical assumptions. Although risk retention limits are common in the financial planning industry, estimates of optimal risk retention that include both financial and human wealth far exceed limits commonly recommended. Households appear to frame property losses differently from other wealth losses leading to wealth-reducing, excess risk transfer. Possible theoretical explanations for excess sensitivity to loss are reviewed. Differences between observed and optimal risk management imply a large potential gain from improved choice.

  11. Identifying and Managing Risk.

    Science.gov (United States)

    Abraham, Janice M.

    1999-01-01

    The role of the college or university chief financial officer in institutional risk management is (1) to identify risk (physical, casualty, fiscal, business, reputational, workplace safety, legal liability, employment practices, general liability), (2) to develop a campus plan to reduce and control risk, (3) to transfer risk, and (4) to track and…

  12. Coordination of short-term and long-term mitigation measures of hydro-meteorological risks: the importance of establishing a link between emergency management and spatial planning

    Science.gov (United States)

    Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa

    2013-04-01

    The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored

  13. LLNL Site 200 Risk Management Plan

    International Nuclear Information System (INIS)

    Pinkston, D.; Johnson, M.

    2008-01-01

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES and H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES and H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March

  14. Risk Management: An Integral Part of Operational Planning

    National Research Council Canada - National Science Library

    Latrash, Frederick

    1999-01-01

    ...) and Joint Task Force (JTF) Commander to achieve military objectives. Risk Management (RM) is a five step process that identifies hazards, assesses risks and implements controls to reduce risks to an acceptable level...

  15. Software And Systems Engineering Risk Management

    Science.gov (United States)

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  16. INTERNAL AUDIT AND RISK MANAGEMENT

    OpenAIRE

    Elena RUSE; Georgiana SUSMANSCHI (BADEA); Daniel DĂNECI-PĂTRĂU

    2014-01-01

    The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (un)chance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities int...

  17. CONSIDERATIONS ON RISK MANAGEMENT APPLIED TO FOREST FIRES

    Directory of Open Access Journals (Sweden)

    Ioan Valentin Marcel Posea

    2016-07-01

    Full Text Available Forest risk and management are ubiquitous in any socio-economic activity. Forestry, more than any other field, is at risk from fire. Consequently, it appears the necessity to implement a fire risk management that could resolve, at least partially, the specific problems. This study attempts to identify the specific stages and processes of forest fire risk management and their content. At the same time, I will try to highlight how a forest fire risk management process planning can be achieved and to present a way of achieving the Plan. I also deem necessary a forest fire risk monitoring and control system that I have built using the Deming cycle.

  18. The nuclear medicine department in the emergency management plan: a referent structure for the nuclear and radiological risks

    International Nuclear Information System (INIS)

    Barat, J.L.; Ducassou, D.; Lesgourgues, P.; Zamaron, S.; Boulard, G.

    2006-01-01

    Each french public or private hospital has to establish guidelines for an immediate response to mass casualties (Emergency Management Plan or 'White' Plan). For a nuclear accident or terrorist attack, the staff of the Nuclear Medicine Department may be adequately prepared and equipped. This paper presents the nuclear and radiological risks section of the final draft of the White Plan developed at Bordeaux University Hospital. (author)

  19. Drug utilization research and risk management

    NARCIS (Netherlands)

    Mazzaglia, Giampiero; Mol, Peter G. M.; Elseviers, Monique; Wettermark, Björn; Almarsdóttir, Anna Birna; Andersen, Morten; Benko, Ria; Bennie, Marion; Eriksson, Irene; Godman, Brian; Krska, Janet; Poluzzi, Elisabetta; Taxis, Katja; Vlahovic-Palcevski, Vera; Stichele, Robert Vander

    2016-01-01

    Good risk management requires continuous evaluation and improvement of planned activities. The evaluation impact of risk management activities requires robust study designs and carefully selected outcome measures. Key learnings and caveats from drug utilization research should be applied to the

  20. Financial risk management for new technology integration in energy planning under uncertainty

    International Nuclear Information System (INIS)

    Ahmed, Sajjad; Elsholkami, Mohamed; Elkamel, Ali; Du, Juan; Ydstie, Erik B.; Douglas, Peter L.

    2014-01-01

    Highlights: • Financial risk associated with over or underproduction of electricity is studied. • A two-stage stochastic model that considers parameter uncertainties is developed. • The model was applied to a real case to meet projected electricity demand of a fleet of generating stations. • Incorporation of financial risk resulted in an increase in electricity cost. • The selection of technologies was the same as that obtained from a deterministic model. - Abstract: This paper proposes a new methodology to include financial risk management in the framework of two-stage stochastic programming for energy planning under uncertainties in demand and fuel price. A deterministic mixed integer linear programming formulation is extended to a two-stage stochastic programming model in order to take into account random parameters that have discrete and finite probabilistic distributions. This was applied to a case study focusing on planning the capacity supply to meet the projected electricity demand for the fleet of electricity generation stations owned and operated by Ontario Power Generation (OPG). The objective of the proposed mathematical model is to minimize cost subject to environmental constraints. The case study is investigated by considering only existing technologies and also by considering the integration of new technologies that help achieve stricter carbon reduction requirements

  1. The NASA Continuous Risk Management Process

    Science.gov (United States)

    Pokorny, Frank M.

    2004-01-01

    As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics

  2. Continuous Risk Management: An Overview

    Science.gov (United States)

    Rosenberg, Linda; Hammer, Theodore F.

    1999-01-01

    Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  3. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    Science.gov (United States)

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.

  4. Danish risk management plans of the EU floods directive

    DEFF Research Database (Denmark)

    Sørensen, Carlo Sass; Jebens, Martin; Piontkowitz, Thorsten

    2017-01-01

    Danish municipalities included in 10 risk areas appointed due to a risk of floods from rivers, the sea, or both. For the municipal work, the national government has provided hazard, vulnerability, and risk assessments and maps as well as guidelines to fulfil the legal binding of the Directive. The plans...... are reviewed and analysed regarding main objectives and structural and non-structural mitigation measures. Conclusions point to the need of introducing better decision support systems, a need to define acceptable risks, and a need to enhance coordination between municipal and cross-sectorial actors as well...... vulnérabilité et de risque, ainsi que des recommandations générales pour la mise en œuvre de la Directive. Les plans de gestion ont ensuite été mis au point, avec les principales mesures d'atténuation structurelles et non structurelles. Le bilan de cette première application montre la nécessité d'introduire de...

  5. Continuous Risk Management at NASA

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  6. INTERNAL AUDIT AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Elena RUSE

    2014-04-01

    Full Text Available The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (unchance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities internal audit department aims to improve performance management, enterprise performance and thus improve the internal control system. This paper aims to demonstrate, among other things, that any event that may result in failure is unquestionably classified as risk.

  7. The background and theory of integrated risk management

    Science.gov (United States)

    Hunsucker, John L.

    1995-01-01

    While all good managers have always considered risk in their decision making, only recently have formal programs to do so been introduced. This report covers the logical structure behind the formulation of an integrated risk management plan (IRM). Included in the report are factors forcing the development of a formal plan to consider risk, the basic objective or purpose of an IRM, and desirable traits of such a plan. The report moves on to a discussion of background issues, seeks to formalize some definitions, and then discusses required information on threats. The report concludes with the steps for an IRM.

  8. Linking Climate Risk, Policy Networks and Adaptation Planning in Public Lands

    Science.gov (United States)

    Lubell, M.; Schwartz, M.; Peters, C.

    2014-12-01

    Federal public land management agencies in the United States have engaged a variety of planning efforts to address climate adaptation. A major goal of these efforts is to build policy networks that enable land managers to access information and expertise needed for responding to local climate risks. This paper investigates whether the perceived and modeled climate risk faced by different land managers is leading to larger networks or more participating in climate adaptation. In theory, the benefits of climate planning networks are larger when land managers are facing more potential changes. The basic hypothesis is tested with a survey of public land managers from hundreds of local and regional public lands management units in the Southwestern United States, as well as other stakeholders involved with climate adaptation planning. All survey respondents report their perceptions of climate risk along a variety of dimensions, as well as their participation in climate adaptation planning and information sharing networks. For a subset of respondents, we have spatially explicity GIS data about their location, which will be linked with downscaled climate model data. With the focus on climate change, the analysis is a subset of the overall idea of linking social and ecological systems.

  9. The connection between long-term and short-term risk management strategies: examples from land-use planning and emergency management in four European case studies

    Science.gov (United States)

    Prenger-Berninghoff, K.; Cortes, V. J.; Sprague, T.; Aye, Z. C.; Greiving, S.; Głowacki, W.; Sterlacchini, S.

    2014-04-01

    The need for continuous adaptation to complex and unforeseen events requires enhancing the links between planning and preparedness phases to reduce future risks in the most efficient way. In this context, the legal-administrative and cultural context has to be taken into account. This is why four case study areas of the CHANGES1 project (Nehoiu Valley in Romania, Ubaye Valley in France, Val Canale in Italy, and Wieprzówka catchment in Poland) serve as examples to highlight currently implemented risk management strategies for land-use planning and emergency preparedness. The strategies described in this paper were identified by means of exploratory and informal interviews in each study site. Results reveal that a dearth or, in very few cases, a weak link exists between spatial planners and emergency managers. Management strategies could benefit from formally intensifying coordination and cooperation between emergency services and spatial planning authorities. Moreover, limited financial funds urge for a more efficient use of resources and better coordination towards long-term activities. The research indicates potential benefits to establishing or, in some cases, strengthening this link and provides suggestions for further development in the form of information and decision support systems as a key connection point. Aside from the existent information systems for emergency management, it was found that a common platform, which integrates involvement of these and other relevant actors could enhance this connection and address expressed stakeholder needs. 1 Marie Curie ITN CHANGES - Changing Hydro-meteorological Risks as Analyzed by a New Generation of European Scientists.

  10. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  11. The connection between long-term and short-term risk management strategies for flood and landslide hazards: examples from land-use planning and emergency management in four European case studies

    Science.gov (United States)

    Prenger-Berninghoff, K.; Cortes, V. J.; Sprague, T.; Aye, Z. C.; Greiving, S.; Głowacki, W.; Sterlacchini, S.

    2014-12-01

    Adaptation to complex and unforeseen events requires enhancing the links between planning and preparedness phases to reduce future risks in the most efficient way. In this context, the legal-administrative and cultural context has to be taken into account. This is why four case study areas of the CHANGES1 project (Nehoiu Valley in Romania, Ubaye Valley in France, Val Canale in Italy, and Wieprzówka catchment in Poland) serve as examples to highlight currently implemented risk management strategies for land-use planning and emergency preparedness. The focus is particularly on flood and landslide hazards. The strategies described in this paper were identified by means of exploratory and informal interviews in each study site. Results reveal that a dearth or, in very few cases, a weak link exists between spatial planners and emergency managers. Management strategies could benefit from formally intensifying coordination and cooperation between emergency services and spatial planning authorities. Moreover, limited financial funds urge for a more efficient use of resources and better coordination towards long-term activities. The research indicates potential benefits to establishing or, in some cases, strengthening this link through contextual changes, e.g., in organizational or administrative structures, that facilitate proper interaction between risk management and spatial planning. It also provides suggestions for further development in the form of information and decision support systems as a key connection point. 1 Marie Curie ITN CHANGES - Changing Hydro-meteorological Risks as Analyzed by a New Generation of European Scientists

  12. Comparative Risk Analysis for Metropolitan Solid Waste Management Systems

    Science.gov (United States)

    Chang, Ni-Bin; Wang, S. F.

    1996-01-01

    Conventional solid waste management planning usually focuses on economic optimization, in which the related environmental impacts or risks are rarely considered. The purpose of this paper is to illustrate the methodology of how optimization concepts and techniques can be applied to structure and solve risk management problems such that the impacts of air pollution, leachate, traffic congestion, and noise increments can be regulated in the iong-term planning of metropolitan solid waste management systems. Management alternatives are sequentially evaluated by adding several environmental risk control constraints stepwise in an attempt to improve the management strategies and reduce the risk impacts in the long run. Statistics associated with those risk control mechanisms are presented as well. Siting, routing, and financial decision making in such solid waste management systems can also be achieved with respect to various resource limitations and disposal requirements.

  13. Improvement of Internal Audit Planning Method through Application of Risk Card by the Indices of Value-Based Management System of Joint-Stock Company

    OpenAIRE

    Oleksandr Smetanko

    2014-01-01

    The Article deals with issues of improving methods of planning and carrying out internal audit in conditions of risk-oriented approach to audit according to the indices of value-based management system - VBM (Value Based Management) using the risk card (risk matrix). A risk card (risk matrix) method has been disclosed taking into account risk level of each of the key factors influencing joint-stock company value rates. Recommendations have been given and abstract of working document has been ...

  14. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  15. Application of a risk management system to improve drinking water safety.

    Science.gov (United States)

    Jayaratne, Asoka

    2008-12-01

    The use of a comprehensive risk management framework is considered a very effective means of managing water quality risks. There are many risk-based systems available to water utilities such as ISO 9001 and Hazard Analysis and Critical Control Point (HACCP). In 2004, the World Health Organization's (WHO) Guidelines for Drinking Water Quality recommended the use of preventive risk management approaches to manage water quality risks. This paper describes the framework adopted by Yarra Valley Water for the development of its Drinking Water Quality Risk Management Plan incorporating HACCP and ISO 9001 systems and demonstrates benefits of Water Safety Plans such as HACCP. Copyright IWA Publishing 2008.

  16. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  17. Teaching Disaster Risk Management: Lessons from the Rotman School of Management

    Directory of Open Access Journals (Sweden)

    ANDRÁS TILCSIK

    Full Text Available This article describes how disaster risk management topics are taught at the Rotman School of Management at the University of Toronto and thus highlights opportunities for developing similar course modules on disaster risk management at other institutions. An undergraduate and MBA elective course, titled Catastrophic Failure in Organizations, contains four modules that are directly relevant to disaster risk management. The first module focuses on the need to move from risk indifference to risk sensitivity. The second module considers the importance of business continuity and crisis management plans and explores their common shortcomings. The third module uses a case study to examine the topic of prospective risk management. The fourth module focuses on the vulnerability of supply chains and other complex systems to disaster risk. The article describes the details of implementing these modules and discusses opportunities for further integration of disaster risk management topics in other parts of the curriculum.

  18. Risk and/or resilience management

    Directory of Open Access Journals (Sweden)

    Jean-Paul Louisot

    2015-06-01

    Full Text Available Risk management aims at managing all the uncertainties that may interfere with the objectives and missions of the organization. Resilience engineering aims at building its capacity to get over disturbances or stress while keeping the functionalities needed to survive, and possibly thrive. A recently open debate on an Internet blog launched by the risk managers of the Scottish Widows Bank seems to arise from what some professionals see as two competing branches of the management sciences. Whereas through the development of ERM – Enterprise-wide Risk Managementrisk management is emerging at last to become a science, as well as an art and a practice, the mentioned above centered on the role of a newly forged name “resilience management”. This opens a new front of the many debates that could derail the path to maturity of Risk Management as a science and reopen new silos much as Business Impact Analysis, BIA, or continuity management, might do if a clear distinction is not made between science, objectives and tools. However, because organizations are so interconnected today in the supply cloud that it is inevitable that they will face catastrophic risk and this is why resilience needs to be a core objective of any risk management plan? Whereas traditional risk management techniques alone may not be adequate to deal with such pervasive and insipient risk scenarios, resilience is ingrained into ERM

  19. Trial of a "credit card" asthma self-management plan in a high-risk group of patients with asthma.

    Science.gov (United States)

    D'Souza, W; Burgess, C; Ayson, M; Crane, J; Pearce, N; Beasley, R

    1996-05-01

    The "credit card" asthma self-management plan provides the adult asthmatic patient with simple guidelines for the self-management of asthma, which are based on the self-assessment of peak expiratory flow rate recordings and symptoms. The study was a trial of the clinical efficacy of the credit card plan in a high-risk group of asthmatic patients. In this "before-and-after" trial, patients discharged from the emergency department of Wellington Hospital, after treatment for severe asthma were invited to attend a series of hospital outpatient clinics at which the credit card plan was introduced. Questionnaires were used to compare markers of asthma morbidity, requirement for emergency medical care, and medication use during the 6-month period before and after intervention with the credit card plan. Of the 30 patients with asthma who attended the first outpatient clinic, 26 (17 women and 9 men) completed the program. In these 26 participants, there was a reduction in both morbidity and requirement for acute medical services: specifically, the proportion waking with asthma more than once a week decreased from 65% to 23% (p = 0.005) and the proportion visiting the emergency department for treatment of severe asthma decreased from 58% to 15% (p = 0.004). The patients attending the clinics commented favorably on the plan, in particular on its usefulness as an educational tool for monitoring and treating their asthma. Although the interpretation of this study is limited by the lack of a randomized control group, the findings are consistent with other evidence that the credit card asthma self-management plan can be an effective and acceptable system for improving asthma care in a high-risk group of adult patients with asthma.

  20. Risk Management and Crisis Response: Are You Prepared?

    Science.gov (United States)

    Schirick, Ed

    2002-01-01

    How a camp responds to a crisis may determine whether it can survive financially. Effective risk management requires total commitment from ownership and management, and staff involvement. Steps in formulating a risk management plan include identifying all potential crises and their frequency and severity potential, developing responses,…

  1. The use of risk management principles in planning an internal audit ...

    African Journals Online (AJOL)

    Kirstam

    12Key words: risk management, key risks, internal auditing, risk-based internal auditing, internal audit .... a structured approach, regardless of the engagement type (for example, a compliance audit), the level of the ... risk management approach (also referred to as 'organisational' or 'enterprise-wide'), rather than a silo ...

  2. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  3. Unforeseen risk and planning perspectives

    International Nuclear Information System (INIS)

    Kobayashi, Kiyoshi

    2013-01-01

    In traditional methodologies of engineering and risk analysis, it is the widely accepted presumption to delineate the scope of consideration by excluding uncertain events with extremely low probabilities, and to seek the rational means to maneuver the presumed risks in rational ways. But we learned these conventional wisdoms are no longer valid from the last earthquake in the Eastern Japan to cope with the unexpected huge disaster. In this article, I still wish to accept a paradigm at the first place that any kinds of analytical investigation for planning cannot stand without presumed comprehension of the world, but to acknowledge its insufficiency. I am motivated to seek the plausible philosophical foundations for risk management which could partly mitigate the methodological limitation driven by cognitive capacities of human beings. The article tries to contemplate the basic issues which may exist in risk communications between professionals and nonprofessional. The paper is concluded by illustrating some basic problems related to practices and researches in infrastructure planning and perspectives for human betterment. (author)

  4. Cognitive mapping tools: review and risk management needs.

    Science.gov (United States)

    Wood, Matthew D; Bostrom, Ann; Bridges, Todd; Linkov, Igor

    2012-08-01

    Risk managers are increasingly interested in incorporating stakeholder beliefs and other human factors into the planning process. Effective risk assessment and management requires understanding perceptions and beliefs of involved stakeholders, and how these beliefs give rise to actions that influence risk management decisions. Formal analyses of risk manager and stakeholder cognitions represent an important first step. Techniques for diagramming stakeholder mental models provide one tool for risk managers to better understand stakeholder beliefs and perceptions concerning risk, and to leverage this new understanding in developing risk management strategies. This article reviews three methodologies for assessing and diagramming stakeholder mental models--decision-analysis-based mental modeling, concept mapping, and semantic web analysis--and assesses them with regard to their ability to address risk manager needs. © 2012 Society for Risk Analysis.

  5. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  6. Hybrid Risk Management Methodology: A Case Study

    Directory of Open Access Journals (Sweden)

    Jacky Siu-Lun Ting

    2009-10-01

    Full Text Available Risk management is a decision-making process involving considerations of political, social, economic and engineering factors with relevant risk assessments relating to a potential hazard. In the last decade, a number of risk management tools are introduced and employed to manage and minimize the uncertainty and threats realization to the organizations. However, the focus of these methodologies are different; in which companies need to adopt various risk management principles to visualize a full picture of the organizational risk level. Regarding to this, this paper presents a new approach of risk management that integrates Hierarchical Holographic Modeling (HHM, Enterprise Risk Management (ERM and Business Recovery Planning (BCP for identifying and assessing risks as well as managing the consequences of realized residual risks. To illustrate the procedures of the proposed methodology, a logistic company ABC Limited is chosen to serve as a case study Through applying HHM and ERM to investigate and assess the risk, ABC Limited can be better evaluated the potential risks and then took the responsive actions (e.g. BCP to handle the risks and crisis in near future.

  7. Plant risk status information management system

    International Nuclear Information System (INIS)

    Campbell, D.J.; Ellison, B.C.; Glynn, J.C.; Flanagan, G.F.

    1985-01-01

    The Plant Risk Status Information Management System (PRISIMS) is a PC program that presents information about a nuclear power plant's design, its operation, its technical specifications, and the results of the plant's probabilistic risk assessment (PRA) in a logically and easily accessible format. PRISIMS provides its user with unique information for integrating safety concerns into day-to-day operational decisions and/or long-range management planning

  8. Health plans and selection: formal risk adjustment vs. market design and contracts.

    Science.gov (United States)

    Frank, R G; Rosenthal, M B

    2001-01-01

    In this paper, we explore the demand for risk adjustment by health plans that contract with private employers by considering the conditions under which plans might value risk adjustment. Three factors reduce the value of risk adjustment from the plans' point of view. First, only a relatively small segment of privately insured Americans face a choice of competing health plans. Second, health plans share much of their insurance risk with payers, providers, and reinsurers. Third, de facto experience rating that occurs during the premium negotiation process and management of coverage appear to substitute for risk adjustment. While the current environment has not generated much demand for risk adjustment, we reflect on its future potential.

  9. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  10. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  11. Management of key pension plan risks from the user aspects

    Directory of Open Access Journals (Sweden)

    Rakonjac-Antić Tatjana

    2013-01-01

    Full Text Available The pension system is an important form of protection of individuals, i.e. of their ensuring for a period of living after retirement, when they are no longer able for working engagement. On the other hand, as a form of long-term insurance, this system presents a strong investment incentive for each economy. Pension plans are an important element of the pension system. There are defined benefit plans, defined contribution plans and hybrid plans, which represent a combination of the two previously mentioned plans. The aim of the work is to define the key risks for each of these types of pension plans in order to determine their advantages and disadvantages, from the aspect of their potential users, on the basis of their comparative analysis.

  12. Strengthening the management of ESA - the Inter-Directorate Reform of Corporate and Risk Management

    Science.gov (United States)

    Feustel-Büechl, Jörg; Arend, Harald; Derio, Eric; Infante, Giovanni; Kreiner, Gerhard; Phaler, Jesse; Tabbert, Michael

    2007-02-01

    ESA has undertaken the Inter-Directorate Reform of Corporate and Risk Management to strengthen the Agency's internal operations. The reform was completed at the end of 2006, encompassing five dedicated projects on Risk Management, Agency-Wide Controlling System, Project Plan and Integrated Project Review, General Budget Structure and Charging Policy, and Corporate Information Systems. It has contributed to improved management of the Agency's internal operations by engaging all internal stakeholders in a common objective, introducing improvements to planning and management methods, elaborating consolidated information structures and tools, contributing to enhanced transparency and accountability, and by providing qualified new policies, processes and tools.

  13. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  14. Risk Management Program Application for the Component Test Capability

    International Nuclear Information System (INIS)

    Stephanie L. Austad; Jeffrey D. Bryan

    2009-01-01

    This paper documents the application of the risk management program requirements to Component Test Capability (CTC) Project activities for each CTC alternative. In particular, DOE O 413.3A, 'Program and Project Management for the Acquisition of Capital Assets,' and DOE G 413.3-7, 'Risk Management Guide for Project Management,' will apply in the event that Alternative 4, Single, Standalone Component Test Facility (CTF), is selected and approved. As such, it is advisable to begin planning to meet the associated Department of Energy (DOE) requirements and guidance as early in the acquisition process as practicable. This white paper is intended to assist in this planning and to support associated decision-making activities. Nontechnical risks associated with each alternative will be identified to support the Next Generation Nuclear Plant (NGNP) CTC alternatives analysis. Technical risks are assumed to be addressed through the Technology Development Risk Management modeling process and are inherent to the alternatives

  15. Probabilistic risk assessment methodology for risk management and regulatory applications

    International Nuclear Information System (INIS)

    See Meng Wong; Kelly, D.L.; Riley, J.E.

    1997-01-01

    This paper discusses the development and potential applications of PRA methodology for risk management and regulatory applications in the U.S. nuclear industry. The new PRA methodology centers on the development of This paper discusses the time-dependent configuration risk profile for evaluating the effectiveness of operational risk management programs at U.S. nuclear power plants. Configuration-risk profiles have been used as risk-information tools for (1) a better understanding of the impact of daily operational activities on plant safety, and (2) proactive planning of operational activities to manage risk. Trial applications of the methodology were undertaken to demonstrate that configuration-risk profiles can be developed routinely, and can be useful for various industry and regulatory applications. Lessons learned include a better understanding of the issues and characteristics of PRA models available to industry, and identifying the attributes and pitfalls in the developement of risk profiles

  16. Risk management in a university environment.

    Science.gov (United States)

    Brewer, Ann; Walker, Ian

    2011-06-01

    Risk is an integral part of quality assurance in higher education in Australia. This paper describes a generic methodology for the identification and management of risk in a university or similar tertiary education environment and outlines a framework that enables the management of risk to be incorporated in the institution's governance cycle. The new approach here is that risk is embedded in the quality assurance framework and, in turn, in the strategic planning and budgeting processes. In many organisations, risk is implemented as a separate process and not considered in any meaningful way as integral to the strategic direction and performance of the university. The paper is based on work carried out by the authors and others between March 2008 and April 2009 to develop a comprehensive system for managing risk in a major Australian university, including processes whereby risk management could be integrated with, and add value to, the overall governance of the university. The case study is described in the appendix to this paper.

  17. Sanitation health risk and safety planning in urban residential ...

    African Journals Online (AJOL)

    The aim of this review paper was to determine the best sanitation health risk and safety planning approach for sustainable management of urban environment. This was achieved by reviewing the concept of sanitation safety planning as a tool. The review adopted exploratory research approach and used secondary data ...

  18. Risk management study for the retired Hanford Site facilities

    International Nuclear Information System (INIS)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-04-01

    Risk from retired surplus facilities has always been assumed to be low at the Hanford Site as the facilities are inactive and have few potentials for causing an offsite hazardous material release. However,the fatal accident that occurred in the spring of 1992 in which an employee fell through a deteriorated roof at the 105-F Reactor Building has raised the possibility that retired facilities represent a greater risk than was originally assumed. Therefore, Westinghouse Hanford Company and the US Department of Energy management have determined that facility risk management strategies and programmatic plans should be reevaluated to assure risks are identified and appropriate corrective action plans are developed. To evaluate risk management strategies, accurate risk information about the current and projected condition of the facilities must be developed. This work procedure has been created to address the development of accurate and timely risk information. By using the evaluation results in this procedure, it will be possible to create a prioritized baseline for managing facility risk until all retired surplus facilities are demolished

  19. Diagnosis and proposal for an integrated risk management en el Valle de Aburra: red risks

    International Nuclear Information System (INIS)

    Aristizabal, Edier; Vargas, Richard

    2008-01-01

    From the analysis of the organizational situation of different institutions of the Aburra Valley oriented to reduce disasters and emergencies of natural and anthropological origin, a system for the prevention, relief and recovery, Area metropolitana del Valle de Aburra, environmental authority and planning institution, has made to the region a pro pose which try to integrate all governmental and private organizations through an integral risk management, denominated: The Regional Risk Management Network in the Aburra Valley, Risk Network. Risk Network is an open organizational system of inter institutional character to direct and co-ordinate policies and actions of analysis and risk reduction, as well as the preparation and execution of the response and recovery of disaster and emergencies. in the Aburra Valley. Two are the strategic instruments of the Network: The Risk Management Regional Plan in the Aburra Valley, and the Integrated Information System which was designed to support the different management processes of the Network.

  20. Managing Risk in Information Resources and Services Provision in ...

    African Journals Online (AJOL)

    Risk management forms an integral part of the Library's planning and monitoring process and its internal control framework. It is therefore a vital element of good governance and management. This paper discusses the strategies for managing risks in the provision of information services in University Libraries. The concept ...

  1. Ordinary risks and accepted fictions: how contrasting and competing priorities work in risk assessment and mental health care planning.

    Science.gov (United States)

    Coffey, Michael; Cohen, Rachel; Faulkner, Alison; Hannigan, Ben; Simpson, Alan; Barlow, Sally

    2017-06-01

    Communication and information sharing are considered crucial to recovery-focused mental health services. Effective mental health care planning and coordination includes assessment and management of risk and safety. Using data from our cross-national mixed-method study of care planning and coordination, we examined what patients, family members and workers say about risk assessment and management and explored the contents of care plans. Thematic analysis of qualitative research interviews (n = 117) with patients, family members and workers, across four English and two Welsh National Health Service sites. Care plans were reviewed (n = 33) using a structured template. Participants have contrasting priorities in relation to risk. Patients see benefit in discussions about risk, but cast the process as a worker priority that may lead to loss of liberty. Relationships with workers are key to family members and patients; however, worker claims of involving people in the care planning process do not extend to risk assessment and management procedures for fear of causing upset. Workers locate risk as coming from the person rather than social or environmental factors, are risk averse and appear to prioritize the procedural aspects of assessment. Despite limitations, risk assessment is treated as legitimate work by professionals. Risk assessment practice operates as a type of fiction in which poor predictive ability and fear of consequences are accepted in the interests of normative certainty by all parties. As a consequence, risk adverse options are encouraged by workers and patients steered away from opportunities for ordinary risks thereby hindering the mobilization of their strengths and abilities. © 2016 The Authors. Health Expectations Published by John Wiley & Sons Ltd.

  2. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  3. Information security management system planning for CBRN facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lenaeu, Joseph D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); O' Neil, Lori Ross [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leitch, Rosalyn M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Glantz, Clifford S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Landine, Guy P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bryant, Janet L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lewis, John [National Nuclear Lab., Workington (United Kingdom); Mathers, Gemma [National Nuclear Lab., Workington (United Kingdom); Rodger, Robert [National Nuclear Lab., Workington (United Kingdom); Johnson, Christopher [National Nuclear Lab., Workington (United Kingdom)

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  4. Information security management system planning for CBRN facilities

    International Nuclear Information System (INIS)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.; Glantz, Clifford S.; Landine, Guy P.; Bryant, Janet L.; Lewis, John; Mathers, Gemma; Rodger, Robert; Johnson, Christopher

    2015-01-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  5. Water Safety Plan for drinking water risk management: the case study of Mortara (Pavia, Italy

    Directory of Open Access Journals (Sweden)

    Sabrina Sorlini

    2017-08-01

    Full Text Available The Water Safety Plan (WSP approach is an iterative method focused on analyzing the risks of water contamination in a drinking water supply system, from catchment to consumer, in order to protect human health. This approach is aimed at identifying and drastically reducing water contamination in the entire drinking water system, through the identification and mitigation or, if possible, elimination of all factors that may cause a chemical, physical, microbiological and radiological risk for water. This study developed a proposal of WSP for the drinking water supply system (DWSS of Mortara, Italy, in order to understand which are the preliminary evaluation aspects to be considered in the elaboration of a WSP. The DWSS of Mortara (a town of 15,500 inhabitants, located in northern Italy consists of three drinking water treatment plants (DWTPs, considering the following main contaminants: arsenic, iron, manganese and ammonia. Potential hazardous events and associated hazards were identified in each part of the water supply system. The risk assessment was carried out following the semi quantitative approach. The WSP proposal for Mortara was very useful not only as a risk mitigation approach, but also as a cost-effective tool for water suppliers. Furthermore, this approach will reduce public health risk, ensure a better compliance of water quality parameters with regulatory requirements, increase confidence of consumers and municipal authorities, and improve resource management due to intervention planning. Further, some new control measures are proposed by the WSP team within this work.

  6. Essentials of Risk Management. Strategic Decisions. Board Basics.

    Science.gov (United States)

    Sonenstein, Burton; Kumin, Laura A.

    1998-01-01

    This booklet, intended for trustees of institutions of higher education, offers some instruction on the principles of risk management. Introductory information provides a definition of risk management, which is seen as a planning and strategic function, not solely as a financial or safety assessment. Individual sections then address the following…

  7. Hanford Mission Plan risk-based prioritization methodologies

    International Nuclear Information System (INIS)

    Hesser, W.A.; Madden, M.S.; Pyron, N.M.; Butcher, J.L.

    1994-08-01

    Sites across the US Department (DOE) complex recognize the critical need for a systematic method for prioritizing among their work scope activities. Here at the Hanford Site, Pacific Northwest Laboratory and Westinghouse Hanford Company (WHC) conducted preliminary research into techniques to meet this need and assist managers in making financial resource allocation decisions. This research is a subtask of the risk management task of the Hanford Mission Plan as described in the WHC Integrated Planning Work Breakdown Structure 1.8.2 Fiscal Year 1994 Work Plan. The research team investigated prioritization techniques used at other DOE sites and compared them with the Priority Planning Grid (PPG), a tool used at Hanford. The authors concluded that the PPG could be used for prioritization of resource allocation, but it needed to be revised to better reflect the Site's priorities and objectives. The revised PPG was tested with three Hanford programs, the PPG was modified, and updated procedures were prepared

  8. The role of risk in electricity resource planning

    International Nuclear Information System (INIS)

    Nicodemus, Gerd

    1998-01-01

    Sources of risk in electricity resource planning include: liberalisation electricity markets and environmental effects of energy choice. Market liberalisation favours more flexible, efficient options, risk-adjusted discount rates will account for different project risks, regulation shifts to incentive-based rather than direct control. Choice of social discount rate takes degree of environmental irreversibility into account (time period affected by economic activity) to preserve flexibility; 'public good' character of environmental risk requires lowering the discount rate. Elaborated risk-management policies are helpful in identifying cost-effective energy options

  9. Risk management and contingency planning for year 2000 - key business decisions for the success of an organization

    International Nuclear Information System (INIS)

    McNeil, J.L.

    1998-01-01

    Factors that transformed Y2K, initially considered as primarily a computer problem, into a business problem are outlined. For example, many organizations have prioritized their inventory of information technology (IT) systems, but few have prioritized their suppliers or customers, or have even thought of what will happen if they cannot get products, or cannot get paid by their customers. Estimates at this time reveal that approximately 30 per cent of businesses will not be operational. This presents a significant risk to any organisation's bottom line. Add to this the status of the world as a whole, where other than about 12 major countries, the majority has not even began to remediate their Y2K problems, and we begin to get a true picture of the potential of major communications problems with subsidiaries, partners or suppliers. Consideration of these factors make it easy to see how Y2K is potentially a major business problem. Because of these risks, it is strongly urged that organizations perform risk management and contingency planning. An example of a risk management approach is presented

  10. Risk management and analysis: risk assessment (qualitative and quantitative)

    OpenAIRE

    Valentin Mazareanu

    2007-01-01

    We use to define risk as the possibility of suffering a loss. Starting this, risk management is defined as a business process whose purpose is to ensure that the organization is protected against risks and their effects. In order to prioritize, to develop a response plan and after that to monitor the identified risks we need to asses them. But at this point a question is born: should I choose a qualitative approach or a quantitative one? This paper will make a short overview over the risk eva...

  11. Social Impact Management Plans: Innovation in corporate and public policy

    Energy Technology Data Exchange (ETDEWEB)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  12. Social Impact Management Plans: Innovation in corporate and public policy

    International Nuclear Information System (INIS)

    Franks, Daniel M.; Vanclay, Frank

    2013-01-01

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  13. Financial risk management of pharmacy benefits.

    Science.gov (United States)

    Saikami, D

    1997-10-01

    Financial risk management of pharmacy benefits in integrated health systems is explained. A managed care organization should assume financial risk for pharmacy benefits only if it can manage the risk. Horizontally integrated organizations often do not have much control over the management of drug utilization and costs. Vertically integrated organizations have the greatest ability to manage pharmacy financial risk; virtual integration may also be compatible. Contracts can be established in which the provider is incentivized or placed at partial or full risk. The main concerns that health plans have with respect to pharmacy capitation are formulary management and the question of who should receive rebates from manufacturers. The components needed to managed pharmacy financial risk depend on the type of contract negotiated. Health-system pharmacists are uniquely positioned to take advantage of opportunities opening up through pharmacy risk contracting. Functions most organizations must provide when assuming pharmacy financial risk can be divided into internal and external categories. Internally performed functions include formulary management, clinical pharmacy services and utilization management, and utilization reports for physicians. Functions that can be outsourced include claims processing and administration, provider- and customer support services, and rebates. Organizations that integrate the pharmacy benefit across the health care continuum will be more effective in controlling costs and improving outcomes than organizations that handle this benefit as separate from others. Patient care should not focus on payment mechanisms and unit costs but on developing superior processes and systems that improve health care.

  14. Strategies for successful software development risk management

    Directory of Open Access Journals (Sweden)

    Marija Boban

    2003-01-01

    Full Text Available Nowadays, software is becoming a major part of enterprise business. Software development is activity connected with advanced technology and high level of knowledge. Risks on software development projects must be successfully mitigated to produce successful software systems. Lack of a defined approach to risk management is one of the common causes for project failures. To improve project chances for success, this work investigates common risk impact areas to perceive a foundation that can be used to define a common approach to software risk management. Based on typical risk impact areas on software development projects, we propose three risk management strategies suitable for a broad area of enterprises and software development projects with different amounts of connected risks. Proposed strategies define activities that should be performed for successful risk management, the one that will enable software development projects to perceive risks as soon as possible and to solve problems connected with risk materialization. We also propose a risk-based approach to software development planning and risk management as attempts to address and retire the highest impact risks as early as possible in the development process. Proposed strategies should improve risk management on software development projects and help create a successful software solution.

  15. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  16. Taking risk assessment and management to the next level - 59395

    International Nuclear Information System (INIS)

    Nelson, Jerel; Morton, Russel Lee; Castillo, Carlos; Dyer, George; Johnson, Natalie; McSwain, James T.; Kruskall, Gary Nick

    2012-01-01

    Document available in abstract form only. Full text of publication follows: A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell into two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact

  17. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Science.gov (United States)

    2010-07-01

    ... compliance, waste minimization, risk reduction and continual improvement of the environmental management... its compliance with the Environmental Management Plan and applicable federal and state hazardous waste... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  18. Risk management at GPU Nuclear

    International Nuclear Information System (INIS)

    Long, R.L.

    1991-01-01

    This paper reports on GPU Nuclear. Among other goals, it established the independence of key safety functions as highlighted by the lessons learned from the accident. In particular, an independent Nuclear Assurance Division was established which include Quality Assurance, Training and Education, Emergency Preparedness, and Nuclear Safety Assessment. The latter consisted of corporate and site independent-safety-review groups. As the GPU Nuclear organization matured, a mid-1987 reorganization created an even more focused Planning and Nuclear Safety Division bringing together Nuclear Safety Assessment with Licensing and Regulatory Affairs and Risk Management. The Risk Management Group (RMG), which began its work in fall 1987, was formed to develop a framework for proactive identification, evaluation, and cost-effective reduction and management of risks of all types. The RMG set out to learn as much as possible about risks and their management in nuclear and other high-technology industries. This began with a thorough literature search. It progressed to interviews with individuals and organizations which have demonstrated innovative ideas, experience, and reputations for safe and reliable operation

  19. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  20. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  1. Shutdown risk management applied at Philadelphia Electric Company

    International Nuclear Information System (INIS)

    Dagan, William J.; True, Douglas E.; Wilson, Thomas; Truax, William

    2004-01-01

    The development and implementation of an effective risk management program requires basic risk or safety knowledge and the conversion of such information into effective management tools. ERIN Engineering and Research, Inc., under contract to the Electric Power Research Institute, has developed an effective program. Outage Risk Assessment and Management (ORAM), to provide plant and management personnel with understandable results of shutdown risk studies. With this tool, the impact of plans and decision options can be readily determined and displayed for the decision maker. This paper describes these methods and their application to the Limerick Nuclear Station of Philadelphia Electric Company. It also sets forth a broader application of these methods to include support of management decisions at-power and following forced outages. The result is an integrated risk management framework which can allow management and technical personnel to utilize readily available and understandable risk insights to optimize each activity. This paper addresses the resolution of several key issues in detail: How was the ORAM risk management method employed to represent the existing plant shutdown procedures and policies? How did the ORAM risk management method enhance the decision-making ability of the outage management staff? How was the ORAM software efficiently integrated with the outage scheduling software? How is quantitative risk information generated and used for outage planning and control? The ORAM risk management philosophy utilizes a series of colors to depict various risk configurations. Each such configuration has associated with it clear guidance. By modifying the conditions existing in the plant it is possible to impact the type of risk being encountered as well as the guidance which is appropriate for that period. In addition, the duration of a particular configuration can be effectively managed to reduce the overall risk impact. These are achieved with minimal

  2. Quantitative risk analysis as a basis for emergency planning

    Energy Technology Data Exchange (ETDEWEB)

    Yogui, Regiane Tiemi Teruya [Bureau Veritas do Brasil, Rio de Janeiro, RJ (Brazil); Macedo, Eduardo Soares de [Instituto de Pesquisas Tecnologicas (IPT), Sao Paulo, SP (Brazil)

    2009-07-01

    Several environmental accidents happened in Brazil and in the world during the 70's and 80's. This strongly motivated the preparation for emergencies in the chemical and petrochemical industries. Environmental accidents affect the environment and the communities that are neighbor to the industrial facilities. The present study aims at subsidizing and providing orientation to develop Emergency Planning from the data obtained on Quantitative Risk Analysis, elaborated according to the Technical Standard P4.261/03 from CETESB (Sao Paulo Environmental Agency). It was observed, during the development of the research, that the data generated on these studies need a complementation and a deeper analysis, so that it is possible to use them on the Emergency Plans. The main issues that were analyzed and discussed on this study were the reevaluation of hazard identification for the emergency plans, the consequences and vulnerability analysis for the response planning, the risk communication, and the preparation to respond to the emergencies of the communities exposed to manageable risks. As a result, the study intends to improve the interpretation and use of the data deriving from the Quantitative Risk Analysis to develop the emergency plans. (author)

  3. Medicare managed care plan performance: a comparison across hospitalization types.

    Science.gov (United States)

    Basu, Jayasree; Mobley, Lee Rivers

    2012-01-01

    The study evaluates the performance of Medicare managed care (Medicare Advantage [MA]) Plans in comparison to Medicare fee-for-service (FFS) Plans in three states with historically high Medicare managed care penetration (New York, California, Florida), in terms of lowering the risks of preventable or ambulatory care sensitive conditions (ACSC) hospital admissions and providing increased referrals for admissions for specialty procedures. Using 2004 hospital discharge files from the Healthcare Cost and Utilization Project (HCUP-SID) of the Agency for Healthcare Research and Quality, ACSC admissions are compared with 'marker' admissions and 'referral-sensitive' admissions, using a multinomial logistic regression approach. The year 2004 represents a strategic time to test the impact of MA on preventable hospitalizations, because the HMOs dominated the market composition in that time period. MA enrollees in California experienced 22% lower relative risk (RRR= 0.78, p<0.01), those in Florida experienced 16% lower relative risk (RRR= 0.84, p<0.01), while those in New York experienced 9% lower relative risk (RRR=0.91, p<0.01) of preventable (versus marker) admissions compared to their FFS counterparts. MA enrollees in New York experienced 37% higher relative risk (RRR=1.37, p<0.01) and those in Florida had 41% higher relative risk (RRR=1.41, p<0.01)-while MA enrollees in California had 13% lower relative risk (RRR=0.87, p<0.01)-of referral-sensitive (versus marker) admissions compared to their FFS counterparts. While MA plans were associated with reductions in preventable hospitalizations in all three states, the effects on referral-sensitive admissions varied, with California experiencing lower relative risk of referral-sensitive admissions for MA plan enrollees. The lower relative risk of preventable admissions for MA plan enrollees in New York and Florida became more pronounced after accounting for selection bias.

  4. IMPLEMENTATION OF RISK-MANAGEMENT SYSTEM IN ENTERPRISE IN CONDITIONS OF INNOVATION ACTIVITY

    Directory of Open Access Journals (Sweden)

    Vereshchagina Ganna

    2018-03-01

    Full Text Available Introduction. Search approaches to assessment and risk management was one of the priority directions of development of modern enterprises. That is why the study of the formation of enterprise risk management in terms of innovation and development of risk management systems in the enterprise is becoming increasingly relevant. Purpose. The aim of this research is to identify the essence of the concept of «risk» and «risk management», to analyze of risk management functions and existing models of risk management, to generalize of risk management process for further minimization of negative consequences and reduce the probability of occurrence of risks in the process of economic activity of enterprises in terms of innovation. Results. In the article the authors analyzed the main approaches to the definition of the concepts «risk» and «risk management». The main functions of risk management, namely forecasting (planning, organization, control, coordination and motivation, are analyzed, and their main characteristics are given. The combination of the performance of all risk management functions in the context of innovation activity allows us to characterize risk management from the viewpoint of a process management approach as a series of consistent management actions characterized by the following stages of the risk management process: analysis and identification, qualitative risk assessment, quantitative risk assessment, risk control, choice of optimization / avoidance or risk prevention methods, development of a management decision, decision-making, impact on risk, evaluation of results and their correcting. Features of existing risk management models and their distinctive features, as well as the main directions and methods of risk management are considered. Conclusions. It is revealed that the process of risk management includes not only the methods for reducing the risk factors of innovation risk, but also the methods for using the

  5. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  6. Improving Operational Risk Management Using Business Performance Management Technologies

    Directory of Open Access Journals (Sweden)

    Bram Pieket Weeserik

    2018-02-01

    Full Text Available Operational Risk Management (ORM comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM technologies are believed to provide a solution for effective Operational Risk Management by offering several combined technologies including: work flow, data warehousing, (advanced analytics, reporting and dashboards. BPM technologies can be integrated with an organization’s Planning & Control cycle and related to strategic objectives. This manuscript aims to show how ORM can benefit from BPM technologies via the development and practical validation of a new maturity model. The B4ORM maturity model was developed following the Design Science Research approach. The maturity model relates specific maturity levels of ORM processes with BPM technologies applicable for a specific maturity stage. There appears to be a strong relationship (0.78 with ORM process maturity and supporting BPM technologies. The B4ORM maturity model as described in this manuscript provides an ideal path of BPM technologies related to six distinctive stages of ORM, leading towards technologies suitable for continuous improvement of ORM processes and organization-wide integration.

  7. Evaluation of the Johne's disease risk assessment and management plan on dairy farms in Ontario, Canada.

    Science.gov (United States)

    Pieper, Laura; Sorge, Ulrike S; DeVries, Trevor J; Godkin, Ann; Lissemore, Kerry; Kelton, David F

    2015-10-01

    Johne's disease (JD) is a production-limiting gastrointestinal disease in cattle. To minimize the effects of JD, the Ontario dairy industry launched the Ontario Johne's Education and Management Assistance Program in 2010. As part of the program, trained veterinarians conducted a risk assessment and management plan (RAMP), an on-farm questionnaire where high RAMP scores are associated with high risk of JD transmission. Subsequently, veterinarians recommended farm-specific management practices for JD prevention. Milk or serum ELISA results from the milking herd were used to determine the herd ELISA status (HES) and within-herd prevalence. After 3.5 yr of implementation of the program, the aim of this study was to evaluate the associations among RAMP scores, HES, and recommendations. Data from 2,103 herds were available for the analyses. A zero-inflated negative binomial model for the prediction of the number of ELISA-positive animals per farm was built. The model included individual RAMP questions about purchasing animals in the logistic portion, indicating risks for between-herd transmission, and purchasing bulls, birth of calves outside the designated calving area, colostrum and milk feeding management, and adult cow environmental hygiene in the negative binomial portion, indicating risk factors for within-herd transmission. However, farms which fed low-risk milk compared with milk replacer had fewer seropositive animals. The model additionally included the JD herd history in the negative binomial and the logistic portion, indicating that herds with a JD herd history were more likely to have at least 1 positive animal and to have a higher number of positive animals. Generally, a positive association was noted between RAMP scores and the odds of receiving a recommendation for the respective risk area; however, the relationship was not always linear. For general JD risk and calving area risk, seropositive herds had higher odds of receiving recommendations compared

  8. Integrating risk management into the baselining process

    International Nuclear Information System (INIS)

    Jennett, N.; Tonkinson, A.

    1994-01-01

    These processes work together in building the project (comprised of the technical, schedule, and cost baselines) against which performance is measured and changes to the scope, schedule and cost of a project are managed and controlled. Risk analysis is often performed as the final element of the scheduling or estimating processes, a precursor to establishing cost and schedule contingency. However, best business practices dictate that information that may be crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable. The purpose or risk management is not to eliminate risk. Neither is it intended to suggest wholesale re-estimating and re-scheduling of a project. Rather, the intent is to make provisions to reduce and control the schedule and/or cost ramifications of risk by anticipating events and conditions that cannot be reliably planned for and which have the potential to negatively impact accomplishment of the technical objectives and requirements of the project

  9. Analysis of Risk Management in Adapted Physical Education Textbooks

    Science.gov (United States)

    Murphy, Kelle L.; Donovan, Jacqueline B.; Berg, Dominck A.

    2016-01-01

    Physical education teacher education (PETE) programs vary on how the topics of safe teaching and risk management are addressed. Common practices to cover such issues include requiring textbooks, lesson planning, peer teaching, videotaping, reflecting, and reading case law analyses. We used a mixed methods design to examine how risk management is…

  10. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  11. Managing IT-related operational risks

    Directory of Open Access Journals (Sweden)

    Savić Ana

    2008-01-01

    Full Text Available Not so long ago, information technology (IT risk occupied a small corner of operational risk - the opportunity loss from a missed IT development deadline. Today, the success of an entire financial institution may lay on managing a broad landscape of IT risks. IT risk is a potential damage to an organization's value, resulting from inadequate managing of processes and technologies. IT risk includes the failure to respond to security and privacy requirements, as well as many other issues such as: human error, internal fraud through software manipulation, external fraud by intruders, obsolesce in applications and machines, reliability issues or mismanagement. The World Economic Forum provides best information about this problem. They rank a breakdown of critical information infrastructure among the most likely core global risks, with 10-20 % likelihood over the next 10 years and potential worldwide impact of $250 billion. Sustained investment in IT - almost $1.2 trillion or 29% of 2006 private-sector capital investment in the U.S. alone fuels growing exposure to IT risk. Greg Hughes, chief strategy officer in Symantec Corp. recently claimed "IT risk management is more than using technology to solve security problems. With proper planning and broad support, it can give an organization the confidence to innovate, using IT to outdistance competitors".

  12. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  13. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  14. Review. Assessing uncertainty and risk in forest planning and decision support systems: review of classical methods and introduction of new approaches

    Directory of Open Access Journals (Sweden)

    M. Pasalodos-Tato

    2013-07-01

    Full Text Available Aim: Since forest planning is characterized by long time horizon and it typically involves large areas of land and numerous stakeholders, uncertainty and risk should play an important role when developing forest management plans. The aim of this study is to review different methods to deal with risk and uncertainty in forest planning, listing problems that forest managers may face during the preparation of management plans and trying to give recommendations in regard to the application of each method according to the problem case. The inclusion of risk and uncertainty in decision support systems is also analyzed.Area: It covers the temporal and spatial scale of forest planning, the spatial context, the participation process, the objectives dimensions and the good and services addressed.Material and methods: Several hundreds of articles dealing with uncertainty and risk were identified regarding different forestry-related topics and approaches. Form them, around 170 articles were further reviewed, categorized and evaluated.Main results: The study presents a thorough review and classification of methods and approaches to consider risk and uncertainty in forest planning. Moreover, new approaches are introduced, showing the opportunities that their application present in forest planning.Research highlights: The study can aid forest managers in the decision making process when designing a forest management plan considering risk and uncertainty.Keywords: operations research; optimal alternative; stochastic risk; endogenous risk; stand level; forest level.

  15. Identification of optimal strategies for energy management systems planning under multiple uncertainties

    International Nuclear Information System (INIS)

    Cai, Y.P.; Huang, G.H.; Yang, Z.F.; Tan, Q.

    2009-01-01

    Management of energy resources is crucial for many regions throughout the world. Many economic, environmental and political factors are having significant effects on energy management practices, leading to a variety of uncertainties in relevant decision making. The objective of this research is to identify optimal strategies in the planning of energy management systems under multiple uncertainties through the development of a fuzzy-random interval programming (FRIP) model. The method is based on an integration of the existing interval linear programming (ILP), superiority-inferiority-based fuzzy-stochastic programming (SI-FSP) and mixed integer linear programming (MILP). Such a FRIP model allows multiple uncertainties presented as interval values, possibilistic and probabilistic distributions, as well as their combinations within a general optimization framework. It can also be used for facilitating capacity-expansion planning of energy-production facilities within a multi-period and multi-option context. Complexities in energy management systems can be systematically reflected, thus applicability of the modeling process can be highly enhanced. The developed method has then been applied to a case of long-term energy management planning for a region with three cities. Useful solutions for the planning of energy management systems were generated. Interval solutions associated with different risk levels of constraint violation were obtained. They could be used for generating decision alternatives and thus help decision makers identify desired policies under various economic and system-reliability constraints. The solutions can also provide desired energy resource/service allocation and capacity-expansion plans with a minimized system cost, a maximized system reliability and a maximized energy security. Tradeoffs between system costs and constraint-violation risks could be successfully tackled, i.e., higher costs will increase system stability, while a desire for lower

  16. Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans

    Science.gov (United States)

    This workbook is a guide for environmental professionals to construct a climate change adaptation plan based on identifying risks and their consequences. It incorporates watershed management, vulnerability assessments and action planning.

  17. Evaluating spatially explicit burn probabilities for strategic fire management planning

    Science.gov (United States)

    C. Miller; M.-A. Parisien; A. A. Ager; M. A. Finney

    2008-01-01

    Spatially explicit information on the probability of burning is necessary for virtually all strategic fire and fuels management planning activities, including conducting wildland fire risk assessments, optimizing fuel treatments, and prevention planning. Predictive models providing a reliable estimate of the annual likelihood of fire at each point on the landscape have...

  18. Online application of a risk management system for risk assessment and monitoring at NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun, E-mail: youngjun51@hotmail.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Yang, Ming, E-mail: yangming@hrbeu.edu.cn [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Wang, Wenlin, E-mail: wlwang0618@126.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Li, Fengjun, E-mail: leefengjun@163.com [China Nuclear Power Engineering Co. Ltd (China)

    2016-08-15

    Highlights: • A generic GO-FLOW modeling structure is proposed for easily Living PSA development and analysis. • Hierarchical and modularized scheme is applied in the development of Living PSA models and database. • A risk management system is developed by GO-FLOW method. • Functional testing is conducted on the risk management system for performance evaluation. • The fast solution time derived from Living PSA application is supportive in plant safety management. - Abstract: The paper presents a risk management system on the basis of Living PSA models which are developed under a proposed generic GO-FLOW modeling method with a hierarchical and modular structure. The design of the risk management system is aiming at assisting plant personnel to manage maintenance plan and system configuration, and conduct system reliability monitoring, risk monitoring and risk management quickly and conveniently through graphical user interfaces without going deep into the details of building, updating and analyzing reliability and risk models. The performance of the proposed risk management system was tested on a full-scale simulator of PWR nuclear power plant and demonstrated that the fast solution time derived from utilization of hierarchical and modularized Living PSA models is strongly supportive for instantaneous risk assessment as well as for daily risk management at NPPs.

  19. Risk Factors, Processes and Risk Management within a Public Health Context

    Directory of Open Access Journals (Sweden)

    Tamás Szentes

    2016-06-01

    Full Text Available Besides clinical medicine, which is in the process of constant and fast development, the focus is increasingly on public health services, which should be well prepared for reducing or keeping under control the dangers induced by the growing social burden of disease. Continuous risk management is represented by these services that are specially designed to prevent diseases and health damages. The grounds for the planning and implementation of public health services are constituted by risk factor management and assessment by means of adopting a unified approach.

  20. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  1. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  2. 77 FR 65000 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2012-10-24

    ...] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug...: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide... Use (ETASU) before CDER's Drug Safety and Risk Management Advisory Committee (DSaRM). The Agency plans...

  3. Risk Management Technique for design and operation of facilities and equipment

    Science.gov (United States)

    Fedor, O. H.; Parsons, W. N.; Coutinho, J. De S.

    1975-01-01

    The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

  4. A global overview of risk management of the DOE complex

    International Nuclear Information System (INIS)

    Alesso, H.P.; Majumdar, K.C.

    1993-01-01

    No endeavor is risk-fire and as we realize the inherent risks in society, our only viable solution is to manage the risk. Application of an integrated risk management program of a large technological system like the DOE complex is a difficult, task; but it is the only rational means to optimize the risk-benefit equation. An effective risk management culture-within the DOE complex will in the long run, ensure a consistent response to mitigate identified risks. An effective risk management program provides responsible administrative planning and logical application of the best technical analyses. It requires the involvement of all personnel. Our objective in this paper is to point out broad perspectives that raise concerns about future DOE ask management issues and to suggest some possible remedies

  5. The contribution of disaster management to integrated flood risk management strategies: lessons learned from the Netherlands

    NARCIS (Netherlands)

    Kolen, B.; van Alphen, J

    2017-01-01

    An integrated flood risk management (IFRM) strategy consist of a comprehensive set of measures to reduce the risk: protective measures (to reduce the probability of a flood), and land use planning and disaster management (to reduce the consequences of a flood. In the Netherlands this is called a

  6. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  7. Sustainability appraisal and flood risk management

    International Nuclear Information System (INIS)

    Carter, Jeremy G.; White, Iain; Richards, Juliet

    2009-01-01

    This research establishes that sustainability appraisal (SA) has a role to play in strengthening spatial plans in the context of flooding issues. Indeed, evidence has been gathered to indicate that tentative steps are being taken in this direction during the SA of English regional spatial plans, which are used as an illustrative case study. In England as in many other countries, appraisal procedures including SA and strategic environmental assessment (SEA) are enshrined in planning law. An opportunity therefore exists to utilise existing and familiar planning tools to embed flooding considerations within spatial plans at an early stage in the planning process. SA (and similar appraisal tools such as SEA) can therefore usefully aid in the implementation of decision making principles and government policy relating to flooding. Moreover, with the threats associated with climate change becoming increasingly apparent, of which increased flood risk is a particular concern in many countries, there is a need develop appropriate adaptation responses. This article emphasizes the role that SA can play in managing future flood risk in this context

  8. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  9. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, Jeffrey H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2010-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  10. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, J.H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2009-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project

  11. Business risk management

    International Nuclear Information System (INIS)

    Cosby, C.

    2015-01-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  12. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  13. Systematic implementation of clinical risk management in a large university hospital: the impact of risk managers.

    Science.gov (United States)

    Sendlhofer, Gerald; Brunner, Gernot; Tax, Christa; Falzberger, Gebhard; Smolle, Josef; Leitgeb, Karina; Kober, Brigitte; Kamolz, Lars Peter

    2015-01-01

    For health care systems in recent years, patient safety has increasingly become a priority issue. National and international strategies have been considered to attempt to overcome the most prominent hazards while patients are receiving health care. Thereby, clinical risk management (CRM) plays a dominant role in enabling the identification, analysis, and management of potential risks. CRM implementation into routine procedures within complex hospital organizations is challenging, as in the past, organizational change strategies using a top-down approach have often failed. Therefore, one of our main objectives was to educate a certain number of risk managers in facilitating CRM using a bottom-up approach. To achieve our primary purpose, five project strands were developed, and consequently followed, introducing CRM: corporate governance, risk management (RM) training, CRM process, information, and involvement. The core part of the CRM process involved the education of risk managers within each organizational unit. To account for the size of the existing organization, we assumed that a minimum of 1 % of the workforce had to be trained in RM to disseminate the continuous improvement of quality and safety. Following a roll-out plan, CRM was introduced in each unit and potential risks were identified. Alongside the changes in the corporate governance, a hospital-wide CRM process was introduced resulting in 158 trained risk managers correlating to 2.0 % of the total workforce. Currently, risk managers are present in every unit and have identified 360 operational risks. Among those, 176 risks were scored as strategic and clustered together into top risks. Effective meeting structures and opportunities to share information and knowledge were introduced. Thus far, 31 units have been externally audited in CRM. The CRM approach is unique with respect to its dimension; members of all health care professions were trained to be able to identify potential risks. A network of risk

  14. Coupling the Biophysical and Social Dimensions of Wildfire Risk to Improve Wildfire Mitigation Planning.

    Science.gov (United States)

    Ager, Alan A; Kline, Jeffrey D; Fischer, A Paige

    2015-08-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social science to improve understanding of community-wide risk perceptions and to predict property owners' capacities and willingness to mitigate risk by treating hazardous fuels and reducing the susceptibility of dwellings. In particular, we identify spatial scale mismatches in wildfire mitigation planning and their potential adverse impact on risk mitigation goals. Studies in other fire-prone regions suggest that these scale mismatches are widespread and contribute to continued wildfire dwelling losses. We discuss how risk perceptions and behavior contribute to scale mismatches and how they can be minimized through integrated analyses of landscape wildfire transmission and social factors that describe the potential for collaboration among landowners and land management agencies. These concepts are then used to outline an integrated socioecological planning framework to identify optimal strategies for local community risk mitigation and improve landscape-scale prioritization of fuel management investments by government entities. © 2015 Society for Risk Analysis.

  15. An approach for risk management and regulatory applications

    International Nuclear Information System (INIS)

    Wong, See-Meng

    2000-01-01

    This paper discusses the development and potential applications of a PRA methodology for risk management and regulatory applications in the U.S. nuclear industry. The new PRA methodology centers on the development of time-dependent configuration risk profiles for evaluating the effectiveness of operational risk management programs at U.S. nuclear power plants. Configuration-risk profiles have been used as risk-information tools for (1) a better understanding of the impact of daily operational activities on plant safety and (2) proactive planning of operational activities to manage risk. Trial applications of the methodology were undertaken to demonstrate that configuration-risk profiles can be developed routinely, and can be useful for various industry and regulatory applications. Lessons learned include a better understanding of the issues and characteristics of PRA models available to industry, and identifying the attributes and pitfalls in the development of risk profiles. (author)

  16. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  17. Small Business and the Risk Management Program

    Science.gov (United States)

    This factsheet helps small businesses comply with the regulation requiring companies that use regulated substances, hazardous chemical such as ammonia and chlorine, to develop a risk management plan, to help prevent accidental toxic or flammable releases.

  18. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  19. Risk control for staff planning in e-commerce warehouses

    NARCIS (Netherlands)

    Wruck, Susanne; Vis, Iris F A; Boter, Jaap

    2016-01-01

    Internet sale supply chains often need to fulfil quickly small orders for many customers. The resulting high demand and planning uncertainties pose new challenges for e-commerce warehouse operations. Here, we develop a decision support tool to assist managers in selecting appropriate risk policies

  20. Overview of the risk management approach to adaptation to climate change in Canada

    International Nuclear Information System (INIS)

    Noble, D.; Bruce, J.; Egener, M.

    2005-03-01

    Climate change poses risks related to frequent and extreme weather events, changes in water availability and changes in the performance of infrastructure systems. Risk management offers a decision-making framework to assist in the selection of optimal or cost-effective strategies using a systematic public process. Risks related to climate change are a new type of risk and are increasingly of concern for governments and citizens around the world. An introduction to risk-based approaches to climate change adaptation decision-making in Canada was presented in this paper. Steps in the risk management process were presented. Risk management approaches from various countries were reviewed, including the Canadian Standards Association's (CSA) national risk management guideline; the Government of Canada's Integrated Risk Management Framework; the Caribbean Risk Management Guideline; World Bank risk management strategies for adaptation to climate change; and the United Kingdom Climate Impacts Program. Details of a study conducted by the United Kingdom Department for Environment, Food, and Rural Affairs to explore the implications of climate change were also presented. Vulnerabilities of response mechanisms to climate change and the interrelations of public systems were reviewed. Issues concerning infrastructure renewal and development were examined, as well as emergency planning and management strategies. It was concluded that the development of training materials and tools for decision-makers in Canada is needed. A climate change risk management planning guidebook was proposed. refs., tabs., figs

  1. Business risk management

    Energy Technology Data Exchange (ETDEWEB)

    Cosby, C., E-mail: Christine.cosby@brucepower.com [Bruce Power, Tiverton, ON (Canada)

    2015-07-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  2. Review. Assessing uncertainty and risk in forest planning and decision support systems: review of classical methods and introduction of innovative approaches

    Energy Technology Data Exchange (ETDEWEB)

    Pasalodos-Tato, M.; Makinen, A.; Garcia-Gonzalez, J.; Borges, J. G.; Lamas, T.; Eriksson, L. O.

    2013-09-01

    Aim: Since forest planning is characterized by long time horizon and it typically involves large areas of land and numerous stake holders, uncertainty and risk should play an important role when developing forest management plans. The aim of this study is to review different methods to deal with risk and uncertainty in forest planning, listing problems that forest managers may face during the preparation of management plans and trying to give recommendations in regard to the application of each method according to the problem case. The inclusion of risk and uncertainty in decision support systems is also analyzed. Area: It covers the temporal and spatial scale of forest planning, the spatial context, the participation process, the objectives dimensions and the good and services addressed. Material and methods: Several hundreds of articles dealing with uncertainty and risk were identified regarding different forestry-related topics and approaches. Form them, around 170 articles were further reviewed, categorized and evaluated. Main results: The study presents a thorough review and classification of methods and approaches to consider risk and uncertainty in forest planning. Moreover, new approaches are introduced, showing the opportunities that their application presents in forest planning. Research highlights: The study can aid forest managers in the decision making process when designing a forest management plan considering risk and uncertainty. (Author)

  3. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  4. Risk Management and Uncertainty in Large Complex Public Projects

    DEFF Research Database (Denmark)

    Neerup Themsen, Tim; Harty, Chris; Tryggestad, Kjell

    Governmental actors worldwide are promoting risk management as a rational approach to man-age uncertainty and improve the abilities to deliver large complex projects according to budget, time plans, and pre-set project specifications: But what do we know about the effects of risk management...... on the abilities to meet such objectives? Using Callon’s (1998) twin notions of framing and overflowing we examine the implementation of risk management within the Dan-ish public sector and the effects this generated for the management of two large complex pro-jects. We show how the rational framing of risk...... management have generated unexpected costly outcomes such as: the undermining of the longer-term value and societal relevance of the built asset, the negligence of the wider range of uncertainties emerging during project processes, and constraining forms of knowledge. We also show how expert accountants play...

  5. Managing Climate Risk to Agriculture and Water Resources in South ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Managing Climate Risk to Agriculture and Water Resources in South Africa ... to better integrate information on climate change and climate variability into water resources policy, planning and management. ... University of the Free State.

  6. Exploration Systems Development (ESD) Approach to Enterprise Risk Management

    Science.gov (United States)

    Bauder, Stephen P.

    2014-01-01

    The National Aeronautics and Space Administration (NASA) Exploration Systems Development (ESD) Division has implemented an innovative approach to Enterprise Risk Management under a unique governance structure and streamlined integration model. ESD's mission is to design and build the capability to extend human existence to deep space. The Enterprise consists of three Programs: Space Launch System (SLS), Orion, and Ground Systems Development and Operations (GSDO). The SLS is a rocket and launch system that will be capable of powering humans, habitats, and support systems to deep space. Orion will be the first spacecraft in history capable of taking humans to multiple destinations within deep space. GSDO is modernizing Kennedy's spaceport to launch spacecraft built and designed by both NASA and private industry. ESD's approach to Enterprise Risk Management is commensurate with affordability and a streamlined management philosophy. ESD Enterprise Risk Management leverages off of the primary mechanisms for integration within the Enterprise. The Enterprise integration approach emphasizes delegation of authority to manage and execute the majority of cross-program activities and products to the individual Programs, while maintaining the overall responsibility for all cross-program activities at the Division. The intent of the ESD Enterprise Risk Management approach is to improve risk communication, to avoid replication and/or contradictory strategies, and to minimize overhead process burden. This is accomplished by the facilitation and integration of risk information within ESD. The ESD Division risks, Orion risks, SLS risks, and GSDO risks are owned and managed by the applicable Program. When the Programs have shared risks with multiple consequences, they are jointly owned and managed. When a risk is associated with the integrated system that involves more than one Program in condition, consequence, or mitigation plan, it is considered an Exploration Systems Integration

  7. Best management practices for creating a community wildfire protection plan

    Science.gov (United States)

    Pamela J. Jakes; Christine Esposito; Sam Burns; Antony S. Cheng; Kristen C. Nelson; Victoria E. Sturtevant; Daniel R. Williams

    2012-01-01

    A community wildfire protection plan (CWPP) is a means of bringing local solutions to wildland fire management. In developing and implementing CWPPs, communities assume a leadership role in reducing wildfi re risk on federal and nonfederal land. In this publication, we identify best management practices for CWPP development and implementation based on the experiences...

  8. Implementing a risk management program at Falconbridge

    International Nuclear Information System (INIS)

    Blechta, G.

    2003-01-01

    A corporate overview of Falconbridge was presented. Falconbridge, founded in 1928 is a leading producer of nickel, copper, cobalt and platinum group metals at low cost. A map displaying its worldwide locations was shown. In Canada, Falconbridge operates in Ontario and Nunavik Territory. The experience in Norway was briefly described, touching on market volatility, market intelligence, portfolio management, and risk management guidelines. The author then explained the purpose of the Energy Project Team, which was responsible for preparing for deregulation, developing strategies for purchasing energy, and minimizing the cost of purchased energy in a competitive market. The plan was described, and the emphasis placed on the core Ontario team. Communication played a large part. The management system functions were reviewed, and analysis provided. The financial integration model was presented. Risk management was dealt with, followed by market intelligence and operational hedge. Division impact was discussed. The major Falconbridge issues were: budget exposure to electricity price variability, how much fixed-price power supply and how long should the contracts be, regulatory structure, market purchase timing, and adhere to corporate risk management policy. The procurement process was described. The author concluded that the product must be kept simple and the number of products limited. A realistic schedule must by adhered to, and a short bidding period of four hours proved ideal. Supplier relationship must be consumer driven. The importance of communication plan was emphasized. Getting pre-approval to make the deal is important. tabs., figs

  9. Risk assessment and radioactive waste management

    International Nuclear Information System (INIS)

    Cohen, J.J.

    1979-01-01

    Problems of radioactive waste management, both real and apparent, have provided a serious constraint in the development of nuclear power. Several studies have been conducted in an attempt to evaluate the actual (quantifiable) risks of radioactive waste management and place them in a reasonable perspective. These studies are reviewed and discussed. Generally, the studies indicate the risks to be of a level of seriousness which might normally be considered acceptable in current society. However, it is apparent that this acceptability has not been attained and public apprehension prevails. To understand the reasons for this apprehension requires an assessment of those factors of ''perceived'' risks which play a major role in determining public attitudes toward radioactive waste management programs and nuclear power, in general. Such factors might include the spector of legacies of harm to future generations, genetic effects, nuclear garbage dumps, proliferation of plutonium inventories, nuclear terrorism, etc. A major problem in development of acceptable waste management policies and programs requires not only the recognition of the importance of perceived risk factors but development of a methodology for their incorporation in planning and conduct of such activities. Some approaches to the development of this methodology are discussed

  10. Sustaining a Mature Risk Management Process: Ensuring the International Space Station for a Vibrant Future

    Science.gov (United States)

    Raftery, Michael; Carter-Journet, Katrina

    2013-01-01

    The International Space Station (ISS) risk management methodology is an example of a mature and sustainable process. Risk management is a systematic approach used to proactively identify, analyze, plan, track, control, communicate, and document risks to help management make risk-informed decisions that increase the likelihood of achieving program objectives. The ISS has been operating in space for over 14 years and permanently crewed for over 12 years. It is the longest surviving habitable vehicle in low Earth orbit history. Without a mature and proven risk management plan, it would be increasingly difficult to achieve mission success throughout the life of the ISS Program. A successful risk management process must be able to adapt to a dynamic program. As ISS program-level decision processes have evolved, so too has the ISS risk management process continued to innovate, improve, and adapt. Constant adaptation of risk management tools and an ever-improving process is essential to the continued success of the ISS Program. Above all, sustained support from program management is vital to risk management continued effectiveness. Risk management is valued and stressed as an important process by the ISS Program.

  11. Protecting your business: from emergency planning to crisis management

    International Nuclear Information System (INIS)

    Ramsay, C.G.

    1999-01-01

    The forthcoming UK Control of Major Accident Hazards (COMAH) regulations under the European Community's Seveso II Directive will impose a new formal requirement to test emergency plans. This might be approached as an added burden on industry to demonstrate safe operation, or can be viewed alternatively as an opportunity to improve crisis management systems and thereby decrease the risks to the business. Crisis is by nature an ambiguous and complex environment, demanding endless initiative, inventiveness, communication, co-ordination and learning. Because large-scale crises threatening the entire business are not frequent, learning from experience must be replaced by competence-assurance based on systems thinking, on risk assessment, on wide scenario simulations and on rigorous training. This paper discusses the benefits from various types of testing of emergency plans and from a business approach to continuous improvement in crisis management capability. (Copyright (c) 1999 Elsevier Science B.V., Amsterdam. All rights reserved.)

  12. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  13. A global approach to risk management: lessons from the nuclear industry

    International Nuclear Information System (INIS)

    Lazo, T.; Kaufer, B.

    2003-01-01

    The industry's nuclear safety experts are continuously striving to minimise the possible risk and extent of a nuclear accident, while nuclear regulatory, authorities work to ensure that all safety requirements are met. Relying on a combination of deterministic and probabilistic approaches, they are obtaining positive results in terms of both risk-informed regulation and nuclear safety management. This article addresses this aspect of risk management, as well as the management of radiation exposure risk. It looks into nuclear emergency planning, preparedness and management, and stresses the importance of coordinating potential protection approaches and providing effective communication should a nuclear accident occur. (authors)

  14. Loss Database Architecture for Disaster Risk Management

    OpenAIRE

    RIOS DIAZ FRANCISCO; MARIN FERRER MONTSERRAT

    2018-01-01

    The reformed Union civil protection legislation (Decision on a Union Civil Protection Mechanism), which entered into force on 1 January 2014, is paving the way for more resilient communities by including key actions related to disaster prevention such as developing national risk assessments and the refinement of risk management planning. Under the Decision, Member States agreed to “develop risk assessments at national or appropriate sub- national level and make available to the Commission a s...

  15. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  16. Managing health and safety risks: Implications for tailoring health and safety management system practices.

    Science.gov (United States)

    Willmer, D R; Haas, E J

    2016-01-01

    As national and international health and safety management system (HSMS) standards are voluntarily accepted or regulated into practice, organizations are making an effort to modify and integrate strategic elements of a connected management system into their daily risk management practices. In high-risk industries such as mining, that effort takes on added importance. The mining industry has long recognized the importance of a more integrated approach to recognizing and responding to site-specific risks, encouraging the adoption of a risk-based management framework. Recently, the U.S. National Mining Association led the development of an industry-specific HSMS built on the strategic frameworks of ANSI: Z10, OHSAS 18001, The American Chemistry Council's Responsible Care, and ILO-OSH 2001. All of these standards provide strategic guidance and focus on how to incorporate a plan-do-check-act cycle into the identification, management and evaluation of worksite risks. This paper details an exploratory study into whether practices associated with executing a risk-based management framework are visible through the actions of an organization's site-level management of health and safety risks. The results of this study show ways that site-level leaders manage day-to-day risk at their operations that can be characterized according to practices associated with a risk-based management framework. Having tangible operational examples of day-to-day risk management can serve as a starting point for evaluating field-level risk assessment efforts and their alignment to overall company efforts at effective risk mitigation through a HSMS or other processes.

  17. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  18. Planning: Management of predictability and uncertainty and keeping abreast of developments

    Science.gov (United States)

    Bastien-Thiry, Christophe; Verfaillie, Gerard

    1993-01-01

    The purpose of this study is to propose method to set up and control of a space mission plan such as that of the HERMES spaceplane. The interest of this subject, other than its complexity, is due to the need to manage imprecision and uncertainty during a mission, as well as changes in between missions. Under these conditions, the set up and control of a flight plan require certain special attention and this has led us to define a certain number of qualities: mastery of complexity in order to resolve conflicts between activities: configuration, resource and time management; consideration of various criteria such as risk minimization or the attainment of mission objectives; robustness and flexibility to allow for hazards and deviations from the norm during operation without having to draw up new plans; aptness for replanning by making changes to the plan without having to set up the whole plan again; and memorization and explanation facility in order to manage developments between missions.

  19. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  20. Integration of industrial risk in regional policy management. Possibilities of evaluation

    International Nuclear Information System (INIS)

    Hubert, Philippe; Pages, Pierre

    1990-02-01

    Since the responsibility for risk management depends more and more on regional factors, evaluation methods and management regulations are not developed enough. This study start from the fact that an important methods exist for evaluation transport of dangerous materials in cities, risk analysis and emergency plans related to classified installations, management of quality of water, 'chronic' industrial risks at local and regional level, probabilistic estimation for industrial plants. The objective is in fact to show what risk analysis could bring to the municipality, the city or the region [fr

  1. Results from a national survey on chronic care management by health plans.

    Science.gov (United States)

    Mattke, Soeren; Higgins, Aparna; Brook, Robert

    2015-05-01

    The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.

  2. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  3. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  4. Urban Risk Reduction Through Effective Disaster Management Plan-A Case Study Of Shimla City Himachal Pradesh India

    Directory of Open Access Journals (Sweden)

    Bhavna Karki

    2015-02-01

    Full Text Available Abstract By 2050 70 of the worlds population will live in urban areas. In India the urban population has increased from 217 million to 377 million in last two decades .With increasing population the associated risk and vulnerability has also increased. As cities continue to grow there is increased pressure on resources exposure of lives livelihoods and economic social and environmental assets to risk is set to increase exponentially. Recognised as one of the best cities for public services and one of the oldest Municipal Corporation in India Shimla city is situated at the traverse spur of the Central Himalayas at 31004 N to 31010 N latitude and 77005 E to 77015 E longitude at an altitude of 2397.59 m metres amsl. This paper aims at underlying the role of Shimla Municipal Corporation SMC as local government in managing disasters in the city along with effective planning and risk assessments.

  5. Hurricane risk management and climate information gatekeeping in southeast Florida

    Science.gov (United States)

    Treuer, G.; Bolson, J.

    2013-12-01

    will not occur until a major hurricane hits the region, despite the cost effectiveness of preemptive interventions. It is assumed that after a hurricane the political risks will shift. New policies will be tried and new infrastructure will be built. Many municipalities and agencies are creating "shovel ready" plans in advance to take advantage of post-catastrophe funds. How do the design of these plans reflect perceptions of legal and political risk? Will they do a good job of reducing scientific risk by addressing long term physical threats? In this study we identify specific challenges to climate adaptation in Florida and explore how local and regional water management decision makers balance physical, legal, and political risks in their planning. A primary risk management tool is the strategic use of information. Through targeted interviews with stakeholders we identify key information gatekeepers and their strategies for reducing multiple types of risk.

  6. A risk-based approach to sanitary sewer pipe asset management.

    Science.gov (United States)

    Baah, Kelly; Dubey, Brajesh; Harvey, Richard; McBean, Edward

    2015-02-01

    Wastewater collection systems are an important component of proper management of wastewater to prevent environmental and human health implications from mismanagement of anthropogenic waste. Due to aging and inadequate asset management practices, the wastewater collection assets of many cities around the globe are in a state of rapid decline and in need of urgent attention. Risk management is a tool which can help prioritize resources to better manage and rehabilitate wastewater collection systems. In this study, a risk matrix and a weighted sum multi-criteria decision-matrix are used to assess the consequence and risk of sewer pipe failure for a mid-sized city, using ArcGIS. The methodology shows that six percent of the uninspected sewer pipe assets of the case study have a high consequence of failure while four percent of the assets have a high risk of failure and hence provide priorities for inspection. A map incorporating risk of sewer pipe failure and consequence is developed to facilitate future planning, rehabilitation and maintenance programs. The consequence of failure assessment also includes a novel failure impact factor which captures the effect of structurally defective stormwater pipes on the failure assessment. The methodology recommended in this study can serve as a basis for future planning and decision making and has the potential to be universally applied by municipal sewer pipe asset managers globally to effectively manage the sanitary sewer pipe infrastructure within their jurisdiction. Copyright © 2014 Elsevier B.V. All rights reserved.

  7. Sport Facility Planning and Management. Sport Management Library.

    Science.gov (United States)

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  8. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  9. Risk evaluation mitigation strategies: the evolution of risk management policy.

    Science.gov (United States)

    Hollingsworth, Kristen; Toscani, Michael

    2013-04-01

    The United States Food and Drug Administration (FDA) has the primary regulatory responsibility to ensure that medications are safe and effective both prior to drug approval and while the medication is being actively marketed by manufacturers. The responsibility for safe medications prior to marketing was signed into law in 1938 under the Federal Food, Drug, and Cosmetic Act; however, a significant risk management evolution has taken place since 1938. Additional federal rules, entitled the Food and Drug Administration Amendments Act, were established in 2007 and extended the government's oversight through the addition of a Risk Evaluation and Mitigation Strategy (REMS) for certain drugs. REMS is a mandated strategy to manage a known or potentially serious risk associated with a medication or biological product. Reasons for this extension of oversight were driven primarily by the FDA's movement to ensure that patients and providers are better informed of drug therapies and their specific benefits and risks prior to initiation. This article provides an historical perspective of the evolution of medication risk management policy and includes a review of REMS programs, an assessment of the positive and negative aspects of REMS, and provides suggestions for planning and measuring outcomes. In particular, this publication presents an overview of the evolution of the REMS program and its implications.

  10. Risk Informed Structural Systems Integrity Management

    DEFF Research Database (Denmark)

    Nielsen, Michael Havbro Faber

    2017-01-01

    The present paper is predominantly a conceptual contribution with an appraisal of major developments in risk informed structural integrity management for offshore installations together with a discussion of their merits and the challenges which still lie ahead. Starting point is taken in a selected...... overview of research and development contributions which have formed the basis for Risk Based Inspection Planning (RBI) as we know it today. Thereafter an outline of the methodical basis for risk informed structural systems integrity management, i.e. the Bayesian decision analysis is provided in summary....... The main focus is here directed on RBI for offshore facilities subject to fatigue damages. New ideas and methodical frameworks in the area of robustness and resilience modeling of structural systems are then introduced, and it is outlined how these may adequately be utilized to enhance Structural Integrity...

  11. Risk Management and Disaster Recovery in Public Libraries in South Australia: A Pilot Study

    Science.gov (United States)

    Velasquez, Diane L.; Evans, Nina; Kaeding, Joanne

    2016-01-01

    Introduction: This paper reports the findings of a study of risk management in public libraries. The focus of the research was to determine whether the libraries had a risk management and disaster plan for major disasters. Method: A qualitative study was done to investigate risk management and disaster recovery in public libraries in South…

  12. Risk Management of Large RC Structures within Spatial Information System

    DEFF Research Database (Denmark)

    Qin, Jianjun; Faber, Michael Havbro

    2012-01-01

    Abstract: The present article addresses the development of a spatial information system (SIS), which aims to facilitate risk management of large‐scale concrete structures. The formulation of the SIS is based on ideas developed in the context of indicator‐based risk modeling for concrete structures...... subject to corrosion and geographical information system based risk modeling concerning large‐scale risk management. The term “risk management” here refers in particular to the process of condition assessment and optimization of the inspection and repair activities. The SIS facilitates the storage...... and handling of all relevant information to the risk management. The probabilistic modeling utilized in the condition assessment takes basis in a Bayesian hierarchical modeling philosophy. It facilitates the updating of risks as well as optimizing inspection plans whenever new information about the condition...

  13. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  14. Reconceptualising risk: Perceptions of risk in rural and remote maternity service planning.

    Science.gov (United States)

    Barclay, Lesley; Kornelsen, Jude; Longman, Jo; Robin, Sarah; Kruske, Sue; Kildea, Sue; Pilcher, Jennifer; Martin, Tanya; Grzybowski, Stefan; Donoghue, Deborah; Rolfe, Margaret; Morgan, Geoff

    2016-07-01

    to explore perceptions and examples of risk related to pregnancy and childbirth in rural and remote Australia and how these influence the planning of maternity services. data collection in this qualitative component of a mixed methods study included 88 semi-structured individual and group interviews (n=102), three focus groups (n=22) and one group information session (n=17). Researchers identified two categories of risk for exploration: health services risk (including clinical and corporate risks) and social risk (including cultural, emotional and financial risks). Data were aggregated and thematically analysed to identify perceptions and examples of risk related to each category. fieldwork was conducted in four jurisdictions at nine sites in rural (n=3) and remote (n=6) Australia. 117 health service employees and 24 consumers. examples and perceptions relating to each category of risk were identified from the data. Most medical practitioners and health service managers perceived clinical risks related to rural birthing services without access to caesarean section. Consumer participants were more likely to emphasise social risks arising from a lack of local birthing services. our analysis demonstrated that the closure of services adds social risk, which exacerbates clinical risk. Analysis also highlighted that perceptions of clinical risk are privileged over social risk in decisions about rural and remote maternity service planning. a comprehensive analysis of risk that identifies how social and other forms of risk contribute to adverse clinical outcomes would benefit rural and remote people and their health services. Formal risk analyses should consider the risks associated with failure to provide birthing services in rural and remote communities as well as the risks of maintaining services. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  15. Evolution of strategic risks under future scenarios for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2016-01-01

    Integrated, long-term risk management in the water sector is poorly developed. Whilst scenario planning has been applied to singular issues (e.g. climate change), it often misses a link to risk management because the likelihood of impacts in the long-term are frequently unaccounted for in these analyses. Here we apply the morphological approach to scenario development for a case study utility, Empresa Portuguesa das Águas Livres (EPAL). A baseline portfolio of strategic risks threatening the achievement of EPAL's corporate objectives was evolved through the lens of three future scenarios, 'water scarcity', 'financial resource scarcity' and 'strong economic growth', built on drivers such as climate, demographic, economic, regulatory and technological changes and validated through a set of expert workshops. The results represent how the baseline set of risks might develop over a 30 year period, allowing threats and opportunities to be identified and enabling strategies for master plans to be devised. We believe this to be the first combined use of risk and futures methods applied to a portfolio of strategic risks in the water utility sector. Copyright © 2015 Elsevier Ltd. All rights reserved.

  16. RISK ASSESSMENT IN PROJECT PLANNING USING FMEA AND CRITICAL PATH METHOD

    Directory of Open Access Journals (Sweden)

    Sandra Milena CHOLES ARVILLA

    2014-10-01

    Full Text Available This paper is based upon the research undertaken for the development of the doctoral thesis “Management of software projects based on object-oriented technology”. The study examines the existing risk management practices commonly used for classic software development. The goal is to integrate the elements of the traditional risk management methodologies to create a new agile risk management methodology. The thesis focuses on techniques that can be easily implemented in extreme programming (XP and SCRUM. This study is motivated by the following research questions: What are the elements of existing quality assurance tools that could meet the principles of agile development? And is it possible to use risk estimation for improving quality in agile projects? The thesis presents a synthesis of the most common risk management techniques, as well as an introduction to agile methods XP and SCRUM. The proposal integrates the concepts of Failure Mode and Effect Analysis into the iterative life cycle of an agile software project. The thesis presents a metamodel which integrates the concepts of agile development methodologies: SCRUM and XP with the FMEA concepts for risk quantification. The model was partly implemented into a real development project. Partial results show the improvement in early identification of failures and allowed to reconsider the Sprint plan.

  17. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  18. The management of acute risks. Oil spill contingency planning and response

    International Nuclear Information System (INIS)

    Monk, D.C.; Cormack, D.

    1992-01-01

    It is clear that the risks of environmental damage can be best minimized by preventing oil spills from occurring at all. Since absolute prevention is unrealistic, however, early detection is essential and aerial surveillance techniques are of great value in this connection. If spills do occur, proper contingency planning and clean-up techniques can minimize impacts, but will rarely avoid them completely if the spilled oil reaches the coastline. It is evident that a main priority should be to prevent spilled oil reaching the coastline. The way in which oil spill response strategy is implemented is discussed in detail. It is based on four key elements: the allocation of responsibilities; contingency planning; training and exercises; regular audit of plans and response mechanisms. A case study of the oil spill strategy employed at the Sullom Voe oil terminal in Shetland is used as an illustration. (UK)

  19. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  20. Assessing and Managing Knowledge Loss Risk

    International Nuclear Information System (INIS)

    Dermarkar, Fred

    2013-01-01

    Summary: • Sustaining Design Basis Knowledge is a strategic need for long term safe and reliable operation; • Utilities need to manage knowledge in a systematic manner, based on identifying areas of risk, developing and implementing plans to mitigate the risk, and exercising oversight of those plans; • Approaches will differ depending upon organizational functions and needs; • Individual utility efforts are not sufficient: they need to be complemented by a larger scale infrastructure in the academic and research communities; • The Canadian nuclear industry has been collaborating to actively support and expand the academic infrastructure to sustain design basis knowledge; • KM initiatives require constant nurturing for sustainability; • Internationally recognized guidance on Characteristics, Attributes and Best Practices for governmental, industrial and academic contributions to KM is important to sustainability

  1. Making decentralised systems viable: a guide to managing decentralised assets and risks.

    Science.gov (United States)

    Willetts, J; Fane, S; Mitchell, C

    2007-01-01

    Decentralised systems have the potential to provide a viable option for long term sustainable management of household wastewater. Yet, at present, such systems hold an uncertain status and are frequently omitted from consideration. Their potential can only be realised with improved approaches to their management, and improved methods to decision-making in planning of wastewater systems. The aim of this paper is to demonstrate the value of a novel framework to guide the planning of decentralised systems so that asset management and risk management are explicitly considered. The framework was developed through a detailed synthesis of literature and practice in the area of asset management of centralised water and wastewater systems, and risk management in the context of decentralised systems. Key aspects of the framework are attention to socio-economic risks as well as engineering, public health and ecological risks, the central place of communication with multiple stakeholders and establishing a shared asset information system. A case study is used to demonstrate how the framework can guide a different approach and lead to different, more sustainable outcomes, by explicitly considering the needs and perspectives of homeowners, water authorities, relevant government agencies and society as a whole.

  2. Enterprise risk management

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, C. [Enbridge, Calgary, AB (Canada)

    2015-07-01

    Enterprise risk management (ERM) is a relative new, holistic and strategic approach for managing risks in modern organizations. ERM builds on and extends traditional risk management (RM). Risk is the effect of uncertainty on objectives - positive and/or negative. Risk management is a set of practices used to understand and address risk. ERM is a form of RM that emphasizes risk aggregation and integration. Risk aggregation is combining individual risks into categories ({sup r}olled up{sup )}. risk integration is embedding RM into organizational contexts ({sup b}uilt in{sup )}.

  3. A multidisciplinary approach to therapeutic risk management of the suicidal patient

    Directory of Open Access Journals (Sweden)

    Grant CL

    2015-06-01

    Full Text Available Cynthia L Grant,1,2 Jaimie L Lusk3 1Arapahoe/Douglas Mental Health Network, Englewood, CO, 2School of Education and Human Development, University of Colorado Denver, Denver, CO, 3Mental Health Service, VA Portland Health Care System, Portland, OR, USA Abstract: As health care trends toward a system of care approach, providers from various disciplines strive to collaborate to provide optimal care for their patients. While a multidisciplinary approach to suicide risk assessment and management has been identified as important for reducing suicidality, standardized clinical guidelines for such an approach do not yet exist. In this article, the authors propose the adoption of the therapeutic risk management of the suicidal patient (TRMSP to improve suicide risk assessment and management within multidisciplinary systems of care. The TRMSP, which has been fully articulated in previous articles, involves augmenting clinical risk assessment with structured instruments, stratifying risk in terms of both severity and temporality, and developing and documenting a safety plan. Augmenting clinical risk assessments with reliable and valid structured instruments serves several functions, including ensuring important aspects of suicide are addressed, establishing a baseline for suicidal thoughts and behaviors, facilitating interprofessional communication, and mitigating risk. Similarly, a two-dimensional risk stratification qualifying suicide risk in terms of both severity and temporality can enhance communication across providers and settings and improve understanding of acute crises in the context of chronic risk. Finally, safety planning interventions allow providers and patients to collaboratively create a personally meaningful plan for managing a suicidal crisis that can be continually modified across time with multiple providers in different care settings. In a busy care environment, the TRMSP can provide concrete guidance on conducting clinically and

  4. Optimization of the production plan and risk control in Third Qinshan Nuclear Power Co.,Ltd

    International Nuclear Information System (INIS)

    Zhou Jun

    2009-01-01

    Some optimized and improved measures have been taken in Third Qinshan Nuclear Power Co., Ltd. (TQNPC) to optimize the routine production plan management, strengthen the maintenance work risk analysis, and improve the plan execution capability. Which involve unified management of generation, refueling, periodic test and maintenance plans; simplifying the defect scale and reducing the intermediate link of defect treatment; intensifying the appraisal on plan execution and adopting star performance evaluation and merit rating measures. In this paper, the above-mentioned improvement and optimization are introduced comprehensively and systematically. (authors)

  5. Selecting a Risk-Based SQC Procedure for a HbA1c Total QC Plan.

    Science.gov (United States)

    Westgard, Sten A; Bayat, Hassan; Westgard, James O

    2017-09-01

    Recent US practice guidelines and laboratory regulations for quality control (QC) emphasize the development of QC plans and the application of risk management principles. The US Clinical Laboratory Improvement Amendments (CLIA) now includes an option to comply with QC regulations by developing an individualized QC plan (IQCP) based on a risk assessment of the total testing process. The Clinical and Laboratory Standards Institute (CLSI) has provided new practice guidelines for application of risk management to QC plans and statistical QC (SQC). We describe an alternative approach for developing a total QC plan (TQCP) that includes a risk-based SQC procedure. CLIA compliance is maintained by analyzing at least 2 levels of controls per day. A Sigma-Metric SQC Run Size nomogram provides a graphical tool to simplify the selection of risk-based SQC procedures. Current HbA1c method performance, as demonstrated by published method validation studies, is estimated to be 4-Sigma quality at best. Optimal SQC strategies require more QC than the CLIA minimum requirement of 2 levels per day. More complex control algorithms, more control measurements, and a bracketed mode of operation are needed to assure the intended quality of results. A total QC plan with a risk-based SQC procedure provides a simpler alternative to an individualized QC plan. A Sigma-Metric SQC Run Size nomogram provides a practical tool for selecting appropriate control rules, numbers of control measurements, and run size (or frequency of SQC). Applications demonstrate the need for continued improvement of analytical performance of HbA1c laboratory methods.

  6. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  7. 'Enterprise risk management' essential for survival and sustainable development of micro, small and medium enterprises

    Directory of Open Access Journals (Sweden)

    Agrawal Reena

    2016-01-01

    Full Text Available The part that Micro, Small and Medium Enterprises (MSMEs play, both in developed and developing countries, cannot be over emphasized and therefore their existence and survival is a matter of concern not only for the policy makers but also for the researchers. Large number of MSMEs die the same year that they are established. The current research was taken up to understand how MSMEs manage their risk and whether enterprise risk management is essential for survival and sustainable development of MSMEs. The objective of the research was to (1 understand the peculiar nature of the MSMEs which make them vulnerable, (2 explore the various risks confronted by MSMEs, (3 understand how the MSMEs manage their risk, (4 understand 'Enterprise Risk Management' and its components and (5 explore the relevance of 'Enterprise Risk Management' for the survival and sustainable development of MSMEs. The results show that MSMEs by virtue of their size, inadequate resources and restricted know-how generally confront wide-ranging risks. In MSMEs the management of risk is concentrated in the hands of the owner-managers and there are no systemic linkages between the planning and risk management. Therefore, this study stresses the need for integrating an effective enterprise risk management system with planning and administration within the MSMEs, to avoid fatal consequences.

  8. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  9. Outage Risk Assessment and Management (ORAM) technology to improve outage safety and economics

    International Nuclear Information System (INIS)

    Kalra, S.P.

    2004-01-01

    The Electric Power Research Institute (EPRI) has undertaken an aggressive program, called ORAM (Outage Risk Assessment and Management), to provide utilities with tools and technology to assist in managing risk during the planning and conduct of outages. The ORAM program consists of the following 6 steps: i) Perform utility surveys and visits on shutdown risk management needs, ii) Perform probabilistic shutdown safety assessments (PSSAs) to identify generic insights that can be incorporated into risk management guidelines and identify selected areas for the development of contingency actions, iii) Develop risk management guidelines (RMG's) that provide a systematic approach to the planning and conduct of outages from a safety perspective. Incorporate insights from the shutdown safety assessments and other operating experience into the RMG's. iv) Develop selected contingency actions including a thermalhydraulic tool kit to address higher risk time periods and activities identified in the shutdown safety assessments, v) Develop computer software that integrates all of the above capability into an easy to use tool for effective shutdown operation management for utilities, vi) Provide assistance in the transfer of this technology and the application of these tools. This paper briefly describes the technical approach and tools developed under EPRI's ORAM program and its applications for improving outage safety and economics. (author)

  10. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  11. Safety risk management of underground engineering in China: Progress, challenges and strategies

    Directory of Open Access Journals (Sweden)

    Qihu Qian

    2016-08-01

    Full Text Available Underground construction in China is featured by large scale, high speed, long construction period, complex operation and frustrating situations regarding project safety. Various accidents have been reported from time to time, resulting in serious social impact and huge economic loss. This paper presents the main progress in the safety risk management of underground engineering in China over the last decade, i.e. (1 establishment of laws and regulations for safety risk management of underground engineering, (2 implementation of the safety risk management plan, (3 establishment of decision support system for risk management and early-warning based on information technology, and (4 strengthening the study on safety risk management, prediction and prevention. Based on the analysis of the typical accidents in China in the last decade, the new challenges in the safety risk management for underground engineering are identified as follows: (1 control of unsafe human behaviors; (2 technological innovation in safety risk management; and (3 design of safety risk management regulations. Finally, the strategies for safety risk management of underground engineering in China are proposed in six aspects, i.e. the safety risk management system and policy, law, administration, economy, education and technology.

  12. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  13. Conflict management in the planning of nuclear installations

    International Nuclear Information System (INIS)

    Pfeifer, M.

    1989-01-01

    Subsequent to the decision of the Bavarian Higher Administrative Court, which after judicial review declared the development plan for the Wackersdorf site and the reprocessing facility there to be void, the author analyses the situation with regard to the tasks to be accomplished by an installation-specific planning management for coping with arising conflicts - and nuclear hazards in particular -, and for coming to a reconciliation of interests. The author agrees with the decision of the Lueneburg Higher Administrative Court which stated that, in view of the subsequent licensing procedure provided by the law, the development plans need not specify any regulations concerning the specific nuclear hazards or radiological consequences of installations of this type, so that development plans within the meaning of sec. 1, sub-sec. (3) BauGB do not necessarily have to consider nuclear risks or dose limits. (orig./HP) [de

  14. Collective proposal of Contingency Plan as an alternative for management risks to socioenvironmental disasters within Network Management Risk of Córrego Dantas (REGER-CD), Nova Friburgo, State of Rio de Janeiro, Brazil

    Science.gov (United States)

    Freitas, Leonardo; Luiza Coelho Netto, Ana

    2017-04-01

    An extreme rainfall event took place in the Mountainous Region of the state of Rio de Janeiro in January 2011, causing a catastrophic landslide that resulted in more than 900 deaths and 350 people disappearances. Precipitation events associated with landslides are common in this region and climate change tends to increase the frequency of intense rains and, consequently, landslides. At the same time, the vulnerability of communities has increased as a result of disorderly urban growth. Despite that, before 2011 communities and public power were not prepared to disaster management..After the 2011 event, public authorities try to established policies to reduce these vulnerabilities. One of the communities where the government acted was Córrego Dantas. However, the actions in this place were carried out in a top-down model, without discussion with population. As a consequence, the performance of public power has amplified social vulnerabilities. Highlight for the truculent removal of residents; resettlement in geographically isolated housing complexes; and the establishment of urbanization policies that go against the interests of the residents. The construction of the Córrego d'Aantas Disaster Risk Management Network (REGER-CD), including residents of affected communities, researchers, NGO members and representatives of the public power, is one way to respond these questions. Within this network, the construction of a proposal for a collective contingency plan, articulated with the municipal contingency plan, is generating residents' empowerment, greater adaptation to risks and reducing the vulnerability of Disasters and mass movements

  15. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    Science.gov (United States)

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  16. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  17. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  18. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  19. Risk perception in planning

    Energy Technology Data Exchange (ETDEWEB)

    Roh, S K

    1987-01-01

    The general public's perception of the risks involved with hazardous industries is increasing, especially in countries that high environmental amenity characteristics. This increased public awareness of risk may be an important factor in the future of countries who produce a large quantity of petroleum and chemical products. However, existing decision-making processes for determining safety controls do not take sufficient account of the community perception of risk. Identification of perceived risk levels could contribute to the determination of safe land-use planning policies and practices. The objective of land-use planning for hazardous industries is to reduce the gap between the calculated or technical assessment of risk and the risk as perceived by the community. This also facilitates a balanced approach in the decision making process between meeting industry requirements and community concerns. The comprehensive analysis presented in this study, based on a questionnaire given to residents in each of the three study areas (Australia, Japan and Korea), focused on identifying and measuring the respondent's understanding of the risk posed by nearby hazardous industrial developments.

  20. Tooth wear risk assessment and care-planning in general dental practice.

    Science.gov (United States)

    O'Toole, S; Khan, M; Patel, A; Patel, N J; Shah, N; Bartlett, D; Movahedi, S

    2018-03-09

    Objective To assess charting, risk assessment and treatment-planning of tooth wear between recently qualified and experienced dentists in general dental practice.Design Service evaluation.Setting Multi-setting evaluation of three mixed NHS/Private general dental practices in North-East London.Methods The clinical notes of new patient examinations on dentate adults presenting from the 1 October 2016 to 31 December 2016 were audited collecting data on tooth wear charting, risk assessment and treatment planning. Data were analysed using descriptives, chi square and logistic regressions in SPSS. Significance was inferred at p charted for 48% of those attending foundation dentists and 5% of those attending experienced dentists. Diet was assessed in 50.6% of patients examined by foundation dentists and 1.0% of patients examined by experienced dentists. Foundation dentists were more likely to chart tooth wear, risk assess and preventively manage tooth wear compared to experienced dentists (p <0.001).Conclusion This service evaluation highlights that improvements are required in recording, risk assessing and preventive treatment planning of erosive tooth wear. Experienced dentists were less likely to risk assess tooth wear and less likely to provide preventive treatment. Experienced GDPs may benefit from re-training in this area.

  1. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  2. Scientific information and the Tongass land management plan: key findings derived from the scientific literature, species assessments, resource analyses, workshops, and risk assessment panels.

    Science.gov (United States)

    Douglas N. Swanston; Charles G. Shaw; Winston P. Smith; Kent R. Julin; Guy A. Cellier; Fred H. Everest

    1996-01-01

    This document highlights key items of information obtained from the published literature and from specific assessments, workshops, resource analyses, and various risk assessment panels conducted as part of the Tongass land management planning process. None of this information dictates any particular decision; however, it is important to consider during decisionmaking...

  3. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  4. 76 FR 34639 - Funding Opportunity Title: Risk Management Education and Outreach Partnerships Program...

    Science.gov (United States)

    2011-06-14

    ... Succession Planning; Marketing: Marketing Strategies; Farm Products Branding; Farmers Markets; Financial: Financial Tools and Planning; Farm Management Strategies; Human: Farm Labor; Farm Safety; Food Safety, Risk... plans and strategies; and 4. Assist producers, farmers and ranchers in deciding on and implementing a...

  5. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  6. [Global risk management].

    Science.gov (United States)

    Sghaier, W; Hergon, E; Desroches, A

    2015-08-01

    Risk management is a fundamental component of any successful company, whether it is in economic, societal or environmental aspect. Risk management is an especially important activity for companies that optimal security challenge of products and services is great. This is the case especially for the health sector institutions. Risk management is therefore a decision support tool and a means to ensure the sustainability of an organization. In this context, what methods and approaches implemented to manage the risks? Through this state of the art, we are interested in the concept of risk and risk management processes. Then we focus on the different methods of risk management and the criteria for choosing among these methods. Finally we highlight the need to supplement these methods by a systemic and global approach including through risk assessment by the audits. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  7. Evaluation of risk management status for Croatian logistic operators

    Directory of Open Access Journals (Sweden)

    Diana BOŽIĆ

    2010-01-01

    Full Text Available Understanding organisational risks makes possible to control them and to change them into organisational strengths. Being known as “measure of uncertainty” in the business process, the risk is the uncertainty of achieving the organizational objectives. It may involve positive or negative consequences. There is a level of uncertainty in every supply chain while operating transportation and warehousing, positioning on the market, developing customer support, reducing cycle times or cutting costs. Therefore, the risk assessment should be one of the main tasks for any supply chain management team. It is required to develop formal risk assessment procedures, to identify the potential impacts to the supply chain operations and to develop a set of contingency plans to mitigate risks. This paper deals with supply chain risk assessment methodology, outlining the present risk management status of Croatian logistic operators.

  8. Risk assessment to an integrated planning model for UST programs

    International Nuclear Information System (INIS)

    Ferguson, K.W.

    1993-01-01

    The US Postal Service maintains the largest civilian fleet in the United States totaling approximately 180,000 vehicles. To support the fleets daily energy requirements, the Postal Service also operates one of the largest networks of underground storage tanks nearly 7,500 nationwide. A program to apply risk assessment to planning, budget development and other management actions was implemented during September, 1989. Working closely with a consultant, the postal service developed regulatory and environmental risk criteria and weighting factors for a ranking model. The primary objective was to identify relative risks for each underground tank at individual facilities. Relative risks at each facility were determined central to prioritizing scheduled improvements to the tank network. The survey was conducted on 302 underground tanks in the Northeast Region of the US. An environmental and regulatory risk score was computed for each UST. By ranking the tanks according to their risk score, tanks were classified into management action categories including, but the limited to, underground tank testing, retrofit, repair, replacement and closure

  9. Risk, Robustness and Water Resources Planning Under Uncertainty

    Science.gov (United States)

    Borgomeo, Edoardo; Mortazavi-Naeini, Mohammad; Hall, Jim W.; Guillod, Benoit P.

    2018-03-01

    Risk-based water resources planning is based on the premise that water managers should invest up to the point where the marginal benefit of risk reduction equals the marginal cost of achieving that benefit. However, this cost-benefit approach may not guarantee robustness under uncertain future conditions, for instance under climatic changes. In this paper, we expand risk-based decision analysis to explore possible ways of enhancing robustness in engineered water resources systems under different risk attitudes. Risk is measured as the expected annual cost of water use restrictions, while robustness is interpreted in the decision-theoretic sense as the ability of a water resource system to maintain performance—expressed as a tolerable risk of water use restrictions—under a wide range of possible future conditions. Linking risk attitudes with robustness allows stakeholders to explicitly trade-off incremental increases in robustness with investment costs for a given level of risk. We illustrate the framework through a case study of London's water supply system using state-of-the -art regional climate simulations to inform the estimation of risk and robustness.

  10. Planning and Management - the Most Neglected Activities in ...

    African Journals Online (AJOL)

    Lexicography has a long history of ineffective planning and inefficient management. This article applies the methods of general planning and management to the planning and management of a lexicographic unit. Keywords: Planning, management, mission statement, strategic focus Areas, performance areas, situational ...

  11. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  12. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  13. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    Science.gov (United States)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  14. The management object in risk management approaches

    OpenAIRE

    Christiansen, Ulrik

    2013-01-01

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible. The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse an...

  15. Supply chain risk management in newspaper company: House of risk approach

    Science.gov (United States)

    Ratnasari, Sintya; Hisjam, Muhammad; Sutopo, Wahyudi

    2018-02-01

    In the supply chain (SC) of newspapers, the printing company is the main entity that has several processes, i.e. procure raw materials, print plate and newspapers, and also distribute newspaper to consumers. The existing risks in the newspaper printing company are quite high. A wide range of disturbances or risks needs to be identified to map out the characteristics of the risk sources that will impact on the performance of the supply chain. Therefore, the printing companies need to manage their supply chain risk of the five major SC processes (such as plan, source, deliver, make, and return). In a case study of a newspaper company in Surakarta, the company have not implemented a risk management process that affects the company. This study is aimed to map the risks in the printing company and formulate risk mitigation alternatives to mitigate the risks. The house of risk (HOR) method was chosen to select a set of proactive actions deemed cost-effective in managing SC Risks in the newspaper company. The model consisting of two stages, the first stage (HOR1) was done by identifying risk, risk causing agents and then measured the severity and occurrences to calculate the Aggregate Risk Priority (ARP) value. The second stage (HOR2) is intended to formulate and prioritize the action of mitigation that the company should pursue to reduce the probability of risk agents to occur. The result shows that the innovative model of HOR in Newspaper Company was presented. There are 24 risk events, 20 causing agents and two priority risks in HOR1. The HOR 2 was proposed 9 ranks of mitigation strategy for priority risk agents, from the easiest to the hardest strategy for the company to implement it.

  16. ArcFuels: an ArcMap toolbar for fuel treatment planning and wildfire risk assessment

    Science.gov (United States)

    Nicole M. Vaillant; Alan A. Ager

    2014-01-01

    Fire behavior modeling and geospatial analysis can provide tremendous insight to land managers in defining both the benefits and potential impacts of fuel treatments in the context of land management goals and public expectations. ArcFuels is a streamlined fuel management planning and wildfire risk assessment system that creates a trans-scale (stand to large landscape...

  17. The Management Object in Risk Management Approaches

    DEFF Research Database (Denmark)

    Christiansen, Ulrik

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible....... The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse and calculate uncertainty and risk. Inspired by social studies of finance and accounting, the paper finally develops...... three propositions that illustrate how the framing of risk establishes a boundary for how managers might understand value creation and the possible future and how this impacts the possible responses to risk....

  18. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  19. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  20. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  1. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  2. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  3. Risk management and participation planning of electric vehicles in smart grids for demand response

    International Nuclear Information System (INIS)

    Nezamoddini, Nasim; Wang, Yong

    2016-01-01

    Demand response (DR) can serve as an effective tool to better balance the electricity demand and supply in the smart grid. It is defined as 'the changes in electricity usage by end-use customers from their normal consumption patterns' in response to pricing and incentive payments. This paper focuses on new opportunities for DR with electric vehicles (EVs). EVs are potential distributed energy resources that support both the grid-to-vehicle and vehicle-to-grid modes. Their participation in the time-based (e.g., time-of-use) and incentive-based (e.g., regulation services) DR programs helps improve the stability and reduce the potential risks to the grid. Smart scheduling of EV charging and discharging activities also supports high penetration of renewables with volatile energy generation. This paper proposes a novel stochastic model from the Independent System Operator's perspective for risk management and participation planning of EVs in the smart grid for DR. The risk factors considered in this paper involve those caused by uncertainties in renewables (wind and solar), load patterns, parking patterns, and transmission lines' reliability. The effectiveness of the model in response to various settings such as the area type (residential, commercial, and industrial), the EV penetration level, and the risk level has been investigated. - Highlights: • We identify new opportunities for demand response (DR) using electric vehicles (EVs). • We integrate EVs in both grid-to-vehicle and vehicle-to-grid modes in smart grids. • EV participation for both time- and incentive-based DR programs are modelled. • We consider uncertainties in renewables, load, parking, and transmission lines. • Model case studies are demonstrated in residential, commercial, and industrial areas.

  4. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    Energy Technology Data Exchange (ETDEWEB)

    McCormack, R.L.

    1997-05-07

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  5. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    International Nuclear Information System (INIS)

    McCormack, R.L.

    1997-01-01

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O'Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE's baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  6. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  7. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  8. Environmental risk prediction and emergency plan for liquid ammonia leakage fault

    International Nuclear Information System (INIS)

    He Zhanfei; Lian Guoxi; Zhang Yuntao; Sun Juan; Du Juan

    2014-01-01

    Taking liquid ammonia storage in a uranium production process as an example, a multi-puff Gassian model was used to predict and analyze the environmental risk under the scenario of the maximum credible accident as well as the most unfavorable weather conditions. According to the results of prediction, the suggestions for safety evacuation and evacuation way were made, thus providing theoretical basis and technical guideline for uranium mine making risk management and contingency plan. (authors)

  9. RiskLab - a joint Teaching Lab on Hazard and Risk Management

    Science.gov (United States)

    Baruffini, Mi.; Baruffini, Mo.; Thuering, M.

    2009-04-01

    In the future natural disasters are expected to increase due to climatic changes that strongly affect environmental, social and economical systems. For this reason and because of the limited resources, governments require analytical risk analysis for a better mitigation planning. Risk analysis is a process to determine the nature and extent of risk by estimating potential hazards and evaluating existing conditions of vulnerability that could pose a potential threat or harm to people, property, livelihoods and environment. This process has become a generally accepted approach for the assessment of cost-benefit scenarios; originating from technical risks it is being applied to natural hazards for several years now in Switzerland. Starting from these premises "Risk Lab", a joint collaboration between the Institute of Earth Sciences of the University of Applied Sciences of Southern Switzerland and the Institute for Economic Research of the University of Lugano, has been started in 2006, aiming to become a competence centre about Risk Analysis and Evaluation. The main issue studied by the lab concerns the topic "What security at what price?" and the activities follow the philosophy of the integral risk management as proposed by PLANAT, that defines the process as a cycle that contains different and interrelated phases. The final aim is to change the population and technician idea about risk from "defending against danger" to "being aware of risks" through a proper academic course specially addressed to young people. In fact the most important activity of the laboratory consists in a degree course, offered both to Engineering and Architecture students of the University of Applied Sciences of Southern Switzerland and Economy Students of the University of Lugano. The course is structured in two main parts: an introductive, theoretical part, composed by class lessons, where the main aspects of natural hazards, risk perception and evaluation and risk management are presented

  10. Waste Isolation Pilot Plant, Land Management Plan

    International Nuclear Information System (INIS)

    1993-01-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives

  11. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  12. Management of Logistics Planning

    OpenAIRE

    Bjørnar Aas; Stein W. Wallace

    2010-01-01

    Logistics problems are gradually becoming more complex and a better understanding of logistics management as a subject is a key to deal with the new challenges. A core element of logistics management is logistics planning, which substitutes for low customer service levels, high waste, and the use of buffers and slacks in the execution of logistic activities. Furthermore, the availability of information and problem-solving capabilities are established as the core parts of logistics planning. B...

  13. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  14. 77 FR 21067 - Funding Opportunity Title: Risk Management Education and Outreach Partnerships Program

    Science.gov (United States)

    2012-04-09

    ..., crop insurance, marketing contracts, and other existing and emerging risk management tools.'' For the... Management or other similar topics. Legal: Legal and Succession Planning or other similar topics; Marketing... Management Education and Outreach Partnerships Program Announcement Type: Announcement of Availability of...

  15. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  16. The Tous Dam Disaster of 1982: Risk communication and the origins of integrated flood risk management in Spain

    Science.gov (United States)

    Serra-Llobet, A.; Tàbara, J.; Sauri, D.

    2012-12-01

    The failure of Tous dam on the Júcar River near Valencia in 1982 was one of the most important socio-natural disasters in 20th century Spain. The death toll of 25 would have been much greater had not a local dam manager anticipated the failure and alerted mayors of a failure, before it actually occurred. The Tous Dam failure occurred a week before the first democratic elections in Spain after the Franco dictatorship, it received extensive coverage in the media. As a result, this disaster triggered a paradigm change in the way disaster risks were perceived and managed at multiple levels of government in Spain. Many factors, often of a qualitative and organisational nature, affect (vertical and horizontal) communication in disaster risk reduction learning and planning at the community level. Through interviews with key actors and stakeholders, content analysis of scientific literature, review of historical and media accounts, and analysis of legislation and regulation, we documented changes that resulted from the Tous Dam failure: (1) A process of institutional development, which led to the growth, and increase in complexity of the organisations involved both in vertical and horizontal communication of disaster risk reduction. (2) Actions taken and experiences gained in dealing with disaster risk reduction in the Tous area were used as a benchmark to develop new strategies, as well as new mechanisms for communication and planning in other territories and other risk domains in Spain.We identify three main stages from 1980s to present in the evolution of disaster risk reduction planning in the area, which show a progressive shift towards a more integrated and preventative approach: (1) After the collapse of the Tous Dam, disaster risk reduction strategies in Spain focused on improving preparedness in order to reduce short-term risks. (2) Disaster management in the 1990s was strongly influenced by international initiatives (e.g. the UN International Decade for Natural

  17. Agile risk management

    CERN Document Server

    Moran, Alan

    2014-01-01

    This work is the definitive guide for IT managers and agile practitioners. It elucidates the principles of agile risk management and how these relate to individual projects. Explained in clear and concise terms, this synthesis of project risk management and agile techniques is illustrated using the major methodologies such as XP, Scrum and DSDM.Although the agile community frequently cites risk management, research suggests that risk is often narrowly defined and, at best, implicitly treated, which in turn leads to an inability to make informed decisions concerning risk and reward and a poor u

  18. Oak Ridge Reservation Waste Management Plan

    International Nuclear Information System (INIS)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year

  19. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  20. Waste management plan for the APT

    International Nuclear Information System (INIS)

    England, J.L.

    1997-01-01

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required

  1. Science-Driven Approach to Disaster Risk and Crisis Management

    Science.gov (United States)

    Ismail-Zadeh, A.

    2014-12-01

    Disasters due to natural extreme events continue to grow in number and intensity. Disaster risk and crisis management requires long-term planning, and to undertake that planning, a science-driven approach is needed to understand and assess disaster risks and to help in impact assessment and in recovery processes after a disaster. Science is used in assessments and rapid modeling of the disaster impact, in forecasting triggered hazards and risk (e.g., a tsunami or a landslide after a large earthquake), in contacts with and medical treatment of the affected population, and in some other actions. At the stage of response to disaster, science helps to analyze routinely the disaster happened (e.g., the physical processes led to this extreme event; hidden vulnerabilities; etc.) At the stage of recovery, natural scientists improve the existing regional hazard assessments; engineers try to use new science to produce new materials and technologies to make safer houses and infrastructure. At the stage of disaster risk mitigation new scientific methods and approaches are being developed to study natural extreme events; vulnerability of society is periodically investigated, and the measures for increasing the resilience of society to extremes are developed; existing disaster management regulations are improved. At the stage of preparedness, integrated research on disaster risks should be developed to understand the roots of potential disasters. Enhanced forecasting and early warning systems are to be developed reducing predictive uncertainties, and comprehensive disaster risk assessment is to be undertaken at local, regional, national and global levels. Science education should be improved by introducing trans-disciplinary approach to disaster risks. Science can help society by improving awareness about extreme events, enhancing risk communication with policy makers, media and society, and assisting disaster risk management authorities in organization of local and regional

  2. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  3. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  4. Risk-based water resources planning: Coupling water allocation and water quality management under extreme droughts

    Science.gov (United States)

    Mortazavi-Naeini, M.; Bussi, G.; Hall, J. W.; Whitehead, P. G.

    2016-12-01

    The main aim of water companies is to have a reliable and safe water supply system. To fulfil their duty the water companies have to consider both water quality and quantity issues and challenges. Climate change and population growth will have an impact on water resources both in terms of available water and river water quality. Traditionally, a distinct separation between water quality and abstraction has existed. However, water quality can be a bottleneck in a system since water treatment works can only treat water if it meets certain standards. For instance, high turbidity and large phytoplankton content can increase sharply the cost of treatment or even make river water unfit for human consumption purposes. It is vital for water companies to be able to characterise the quantity and quality of water under extreme weather events and to consider the occurrence of eventual periods when water abstraction has to cease due to water quality constraints. This will give them opportunity to decide on water resource planning and potential changes to reduce the system failure risk. We present a risk-based approach for incorporating extreme events, based on future climate change scenarios from a large ensemble of climate model realisations, into integrated water resources model through combined use of water allocation (WATHNET) and water quality (INCA) models. The annual frequency of imposed restrictions on demand is considered as measure of reliability. We tested our approach on Thames region, in the UK, with 100 extreme events. The results show increase in frequency of imposed restrictions when water quality constraints were considered. This indicates importance of considering water quality issues in drought management plans.

  5. Parking management : strategies, evaluation and planning

    International Nuclear Information System (INIS)

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  6. Business Continuity Management Plan

    Science.gov (United States)

    2014-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT BUSINESS CONTINUITY MANAGEMENT PLAN December 2014......maximum 200 words) Navy Supply Systems Command (NAVSUP) lacks a business process framework for the development of Business Continuity Management

  7. Metro Vancouver air quality management plan : progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-10-15

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs.

  8. Metro Vancouver air quality management plan : progress report

    International Nuclear Information System (INIS)

    2008-10-01

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs

  9. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  10. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  11. 33 CFR 151.57 - Waste management plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Waste management plans. 151.57... Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.57 Waste management... follows the plan. (c) Each waste management plan under paragraph (b) of this section must be in writing...

  12. Rethinking risk management

    International Nuclear Information System (INIS)

    Kloman, H.F.

    1992-01-01

    The purpose of this paper is to bring together the ideas of those who currently practice the many different forms of risk management on a global basis. These forms include guidance of public policy on macro risks, risk financing and insurance for many larger commercial organizations, managing credit, currency and interest rate risks for financial institutions, plus other extensions of risk management including security, quality control, and quality assurance in a health-care environment

  13. Risk Management in Future Romanian E-Government 2.0 Projects

    Directory of Open Access Journals (Sweden)

    Didraga Otniel

    2015-08-01

    Full Text Available E-government public services in Romania must follow unitary procedures considering the new requirements of the European Union from the Digital Agenda for Europe Strategy 2020. E-government 2.0 has to be implemented because of the cultural and behavioral transformations in the interaction between governments and users of e-services. E-government 2.0 projects use tools and techniques of social media to accomplish their goals. This article examines the possible risk categories and the risk management procedures needed to mitigate risks in future Romanian e-government projects, according to the strategic lines of development for the Digital Agenda. We propose a risk management plan for the e-government lines of action within the strategic lines of development that includes identifying, assessing, and mitigating the risks. New and modernized government services through e-government 2.0 projects that apply risk management will bring a significant improvement in how citizens and businesses relate to government and will increase the use of e-government services.

  14. The Modern Management of Urban Planning and the Controlling Planning

    Institute of Scientific and Technical Information of China (English)

    1991-01-01

    <正> Since 1980s,with the further reform of political and economic systems,the urban construc-tion in our country has undergone great changes,greater than ever.Such changes pose a series ofnew problems to urban planning:How should planning be suitable for the development of moderncities?How should planning management coordinate with urban planning?How to carry out ur-ban planning under new situations? etc.The answers to these problems lie in one point:urbanplanning and plann ing management must be restructured.Only when the former is well com-bined with the latter can the above problems be solved satisfactorily.This article provides someviews in this respect.

  15. Risk Management of P2P Internet Financing Service Platform

    Science.gov (United States)

    Yalei, Li

    2017-09-01

    Since 2005, the world’s first P2P Internet financing service platform Zopa in UK was introduced, in the development of “Internet +” trend, P2P Internet financing service platform has been developed rapidly. In 2007, China’s first P2P platform “filming loan” was established, marking the P2P Internet financing service platform to enter China and the rapid development. At the same time, China’s P2P Internet financing service platform also appeared in different forms of risk. This paper focuses on the analysis of the causes of risk of P2P Internet financing service platform and the performance of risk management process. It provides a solution to the Internet risk management plan, and explains the risk management system of the whole P2P Internet financing service platform and the future development direction.

  16. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  17. Integrating scientific and local knowledge to inform risk-based management approaches for climate adaptation

    Directory of Open Access Journals (Sweden)

    Nathan P. Kettle

    2014-01-01

    Full Text Available Risk-based management approaches to climate adaptation depend on the assessment of potential threats, and their causes, vulnerabilities, and impacts. The refinement of these approaches relies heavily on detailed local knowledge of places and priorities, such as infrastructure, governance structures, and socio-economic conditions, as well as scientific understanding of climate projections and trends. Developing processes that integrate local and scientific knowledge will enhance the value of risk-based management approaches, facilitate group learning and planning processes, and support the capacity of communities to prepare for change. This study uses the Vulnerability, Consequences, and Adaptation Planning Scenarios (VCAPS process, a form of analytic-deliberative dialogue, and the conceptual frameworks of hazard management and climate vulnerability, to integrate scientific and local knowledge. We worked with local government staff in an urbanized barrier island community (Sullivan’s Island, South Carolina to consider climate risks, impacts, and adaptation challenges associated with sea level rise and wastewater and stormwater management. The findings discuss how the process increases understanding of town officials’ views of risks and climate change impacts to barrier islands, the management actions being considered to address of the multiple impacts of concern, and the local tradeoffs and challenges in adaptation planning. We also comment on group learning and specific adaptation tasks, strategies, and needs identified.

  18. Knowledge management in support of enterprise risk management

    OpenAIRE

    Rodriguez, Eduardo; Edwards, John S.

    2014-01-01

    Risk management and knowledge management have so far been studied almost independently. The evolution of risk management to the holistic view of Enterprise Risk Management requires the destruction of barriers between organizational silos and the exchange and application of knowledge from different risk management areas. However, knowledge management has received little or no attention in risk management. This paper examines possible relationships between knowledge management constructs relate...

  19. [Medical safety management in the setting of a clinical reference laboratory--risk management efforts in clinical testing].

    Science.gov (United States)

    Seki, Akira; Miya, Tetsumasa

    2011-03-01

    As a result of recurring medical accidents, risk management in the medical setting has been given much attention. The announcement in August, 2000 by the Ministry of Health committee for formulating a standard manual for risk management, of a "Risk management manual formulation guideline" has since been accompanied by the efforts of numerous medical testing facilities to develop such documents. In 2008, ISO/TS 22367:2008 on "Medical laboratories-Reduction of error through risk management and continual improvement" was published. However, at present, risk management within a medical testing facility stresses the implementation of provisional actions in response to a problem after it has occurred. Risk management is basically a planned process and includes "corrective actions" as well as "preventive actions." A corrective action is defined as identifying the root cause of the problem and removing it, and is conducted to prevent the problem from recurring. A preventive action is defined as identifying of the any potential problem and removing it, and is conducted to prevent a problem before it occurs. Presently, I shall report on the experiences of our laboratory regarding corrective and preventive actions taken in response to accidents and incidents, respectively.

  20. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  1. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  2. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  3. Operational Risk Management: Increasing Mission Effectiveness Through Improved Planning and Execution of Joint Operations

    National Research Council Canada - National Science Library

    Beckvonpeccoz, Stephen

    1997-01-01

    .... This deficiency should be remedied with the adoption of Operational Risk Management (ORM), an existing process which would provide operational commanders a tool for making smarter risk decisions...

  4. Management Cycle: from Planning to Evaluation

    OpenAIRE

    Kova?i?, Luka; Jakši?, Želimir

    2008-01-01

    The planning process in health care known as management cycle or cycle of organization and management is described. The cycle is divided in four main elements: planning, organization, implementation and evaluation. Each element is defined and described.

  5. Nurse manager succession planning: synthesis of the evidence.

    Science.gov (United States)

    Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria

    2013-10-01

    The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.

  6. Coopetition as Support Strategy for Supply Chain Risk Management

    Directory of Open Access Journals (Sweden)

    João Batista de Camargo Junior

    2014-06-01

    Full Text Available As supply chain management research and its adoption advance, new challenges are imposed for researchers and managers. Accordingly, the supply chain risk management (SCRM has been a prominent field because it suggests strategies and action plans to mitigate these risks. On the other hand, it is observed that the coopetition concept advocates that two competing organizations can work together in some activities in the form of a strategic alliance, contributing to achieve maximum efficiency. Therefore, the purpose of this paper is to propose the extension of this concept into the activities of SCRM, treating coopetition as an action that can be added to the risk management efforts in order to make supply chains more resilient. Thus, through an exploratory literature search that uses secondary data, we drawn two propositions that deal with the possibility of adding a coopetitor to reduce risks in supply chains and on the feasibility of balanced coopetition changes the profile of a supply chain to a resilient model. Although these propositions require further empirical verification, it is believed that this is a good start for discussions about the benefits and competitive advantages that the adoption of coopetition in risk management activities in supply chains can bring to organizations.

  7. Risk management overview

    International Nuclear Information System (INIS)

    McGovern, S.

    1995-01-01

    Launching of the first natural gas contract by the New York Mercantile Exchange (NYMEX) in April 1990 was a huge success which allowed natural gas to surpass crude oil as the most successful launch of any commodity contract. Despite this unprecedented initial success it must be kept in mind that in a competitive marketplace there are risks of many kinds (market risks, price risks, basis risks, currency risks and timing risks), that parties must deal with in everyday operations. The concept of risk management was defined, techniques and issues in risk management were explained, a glossary of fully explained industry terms, and basic financial tools most often used in risk management, were provided. 11 figs

  8. Sustainable Forest Management in Cameroon Needs More than Approved Forest Management Plans

    Directory of Open Access Journals (Sweden)

    Paolo Omar. Cerutti

    2008-12-01

    Full Text Available One of the main objectives of the 1994 Cameroonian forestry law is to improve the management of production forests by including minimum safeguards for sustainability into compulsory forest management plans. As of 2007, about 3.5 million hectares (60% of the productive forests are harvested following the prescriptions of 49 approved management plans. The development and implementation of these forest management plans has been interpreted by several international organizations as long awaited evidence that sustainable management is applied to production forests in Cameroon. Recent reviews of some plans have concluded, however, that their quality was inadequate. This paper aims at taking these few analyses further by assessing the actual impacts that approved management plans have had on sustainability and harvesting of commercial species. We carry out an assessment of the legal framework, highlighting a fundamental flaw, and a thorough comparison between data from approved management plans and timber production data. Contrary to the principles adhered to by the 1994 law, we find that the government has not yet succeeded in implementing effective minimum sustainability safeguards and that, in 2006, 68% of the timber production was still carried out as though no improved management rules were in place. The existence of a number of approved management plans cannot be used a proxy for proof of improved forest management.

  9. Application of Wildfire Risk Assessment Results to Wildfire Response Planning in the Southern Sierra Nevada, California, USA

    Directory of Open Access Journals (Sweden)

    Matthew P. Thompson

    2016-03-01

    Full Text Available How wildfires are managed is a key determinant of long-term socioecological resiliency and the ability to live with fire. Safe and effective response to fire requires effective pre-fire planning, which is the main focus of this paper. We review general principles of effective federal fire management planning in the U.S., and introduce a framework for incident response planning consistent with these principles. We contextualize this framework in relation to a wildland fire management continuum based on federal fire management policy in the U.S. The framework leverages recent advancements in spatial wildfire risk assessment—notably the joint concepts of in situ risk and source risk—and integrates assessment results with additional geospatial information to develop and map strategic response zones. We operationalize this framework in a geographic information system (GIS environment based on landscape attributes relevant to fire operations, and define Potential wildland fire Operational Delineations (PODs as the spatial unit of analysis for strategic response. Using results from a recent risk assessment performed on several National Forests in the Southern Sierra Nevada area of California, USA, we illustrate how POD-level summaries of risk metrics can reduce uncertainty surrounding potential losses and benefits given large fire occurrence, and lend themselves naturally to design of fire and fuel management strategies. To conclude we identify gaps, limitations, and uncertainties, and prioritize future work to support safe and effective incident response.

  10. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results

    International Nuclear Information System (INIS)

    Turcotte, R.; Fortin, L.G.; Pugin, S.; Cyr, J.F.; Picard, F.; Poirier, C.; Lacombe, P.

    2004-01-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs

  11. 7 CFR 407.17 - Group risk plan for wheat.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Group risk plan for wheat. 407.17 Section 407.17..., DEPARTMENT OF AGRICULTURE GROUP RISK PLAN OF INSURANCE REGULATIONS § 407.17 Group risk plan for wheat. The provisions of the Group Risk Plan for Wheat for the 2000 and succeeding crop years are as follows: 1...

  12. 7 CFR 407.11 - Group risk plan for corn.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Group risk plan for corn. 407.11 Section 407.11..., DEPARTMENT OF AGRICULTURE GROUP RISK PLAN OF INSURANCE REGULATIONS § 407.11 Group risk plan for corn. The provisions of the Group Risk Plan for Corn for the 2000 and succeeding crop years are as follows: 1...

  13. Top management turnover and firm default risk: Evidence from the Chinese securities market

    Directory of Open Access Journals (Sweden)

    Wei Ting

    2011-06-01

    Full Text Available China has moved rapidly from a socialist planned economy to a market economy. As a result, many enterprises in China are seeking talented top management to increase their performance and decrease their default risk. Studies abound regarding top management turnover and its relationship with firm performance, however, few studies have connected top management turnover with firm default risk. In China, a market with extensive financial fraud, firm default risk is an important factor and thus we explore this relationship in the Chinese securities market. Our results indicate that firms with higher default risk are more likely to change their top management in the next financial reporting period. In addition, following changes in top management, such firms default less than other companies.

  14. Top management turnover and firm default risk:Evidence from the Chinese securities market

    Institute of Scientific and Technical Information of China (English)

    Wei; Ting

    2011-01-01

    China has moved rapidly from a socialist planned economy to a market economy.As a result,many enterprises in China are seeking talented top management to increase their performance and decrease their default risk.Studies abound regarding top management turnover and its relationship with firm performance,however,few studies have connected top management turnover with firm default risk.In China,a market with extensive financial fraud,firm default risk is an important factor and thus we explore this relationship in the Chinese securities market.Our results indicate that firms with higher default risk are more likely to change their top management in the next financial reporting period.In addition,following changes in top management,such firms default less than other companies.

  15. Decision-making and evacuation planning for flood risk management in the Netherlands.

    Science.gov (United States)

    Kolen, Bas; Helsloot, Ira

    2014-07-01

    A traditional view of decision-making for evacuation planning is that, given an uncertain threat, there is a deterministic way of defining the best decision. In other words, there is a linear relation between threat, decision, and execution consequences. Alternatives and the impact of uncertainties are not taken into account. This study considers the 'top strategic decision-making' for mass evacuation owing to flooding in the Netherlands. It reveals that the top strategic decision-making process itself is probabilistic because of the decision-makers involved and their crisis managers (as advisers). The paper concludes that deterministic planning is not sufficient, and it recommends probabilistic planning that considers uncertainties in the decision-making process itself as well as other uncertainties, such as forecasts, citizens responses, and the capacity of infrastructure. This results in less optimistic, but more realistic, strategies and a need to pay attention to alternative strategies. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.

  16. Pandemic preparedness - Risk management and infection control for all respiratory infection outbreaks.

    Science.gov (United States)

    Nori, Annapurna; Williams, Mary-Anne

    2009-11-01

    There has been substantial effort and activity in regards to pandemic planning, preparedness and response, mainly in the realm of public health. However, general practitioners and other primary care providers are important players in the health response to a pandemic. To discuss the importance of general practice preparedness for managing respiratory infection outbreaks and to provide a model for the general practice response. Pandemic planning and preparedness in general practice is ultimately a crucial risk management exercise, the cornerstone of which is sound infection control. As planning will be significantly aided by, and should extend to, other respiratory outbreaks, we propose a framework for managing outbreaks of respiratory infections with a focus on planned, practised and habitual infection control measures, and a stepwise response according to the extent and severity of the outbreak.

  17. Internal risks of factoring business: identification, cause-effect relationships, accounting and management aspects

    Directory of Open Access Journals (Sweden)

    I.M. Vygivska

    2017-12-01

    Full Text Available The article identifies the risks of the economic activity of a factoring company. The identified risks are divided into internal (fraud risk, credit risk, liquidity, nonpayment, staff, supplier's failure to meet the terms of the supply / factoring contract and external (legal, inflation, currency, interest, industry risks, country risk. The cause-effect relationships of the identified risks have been established. The content of information requests of the leading part of the factoring company, as well as the management subsystems (accounting, economic analysis, control and planning, and the direction of information flows between them (to manage the company's internal risks is determined. These proposals contribute to the improvement of accounting and analytical support for risk management of the factoring business, the choice of alternative risk management methods, the impact on their possible consequences, minimizing the negative impact of risks on the financial condition of the company, and establishing the effectiveness of factoring operations under risk.

  18. Risk Management in Csr Unit of Shams Hospital Using FMEA Technique -Tabriz

    Directory of Open Access Journals (Sweden)

    Mohammad Saadati

    2015-08-01

    Full Text Available Background and Objectives : Since one of the effective ways to prevent infections is the proper sterilization of instruments, CSR is one of the most important units in hospitals. Thus, risk management has a high priority in CSR. The aim of this study was to identify and prevent potential risks in CSR unit in Shams Hospital using FMEA technique. Material and Methods : This is a descriptive and interventional study. Using FMEA technique, potential risks were identified. Risks were prioritized and corrective interventions were implemented to reduce risks. Results : The current study identified 69 risks that 10 risks were marked as high priority. Corrective activities were suggested by risk management teams which were applied. Conclusion : The results showed that flaws in safety policies, equipment and physical conditions were the most important risk factors. Implementing risk management plan and clear safety policies could be useful. ​

  19. Modelling and Risk Management in the Offshore and Marine Industry Supply Chain

    Directory of Open Access Journals (Sweden)

    Carman Lee

    2012-03-01

    Full Text Available Supply chain risk management is primarily a process that involves the identification, assessment and mitigation of risks that arise in a particular supply chain system. Pertaining to that, the offshore and marine industry is one of the many industries that have seldom received much consideration when it comes to management of the supply chain system. The rig building facet of the offshore and marine industry was thus chosen as the main focus of the project to manage the risks that arise in a particular oil rig building project. A risk mitigation plan framework was proposed to act as a guideline to identify as much risk as possible, eliminate trivial ones, and subsequently, prioritizing the remaining ones. The final step involves the formulation of a mathematical model based on the selected risk. In this case, the risk of raw material price fluctuation is studied. The demonstration of the Monte Carlo simulation using the Risk Solver program was also done to quantify the risks. Two case scenarios were then developed along with the implementation of risk management techniques in order to observe the effectiveness of the risk management of the overall rig building supply chain.

  20. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    Science.gov (United States)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  1. Choice of corporate risk management tools under moral hazard

    Czech Academy of Sciences Publication Activity Database

    Bena, Jan

    -, č. 298 (2006), s. 1-43 ISSN 1211-3298 R&D Projects: GA MŠk LC542 Institutional research plan: CEZ:AV0Z70850503 Keywords : risk management * corporate insurance * moral hazard Subject RIV: AH - Economics http://www.cerge-ei.cz/pdf/wp/Wp298.pdf

  2. Choice of corporate risk management tools under moral hazard

    Czech Academy of Sciences Publication Activity Database

    Bena, Jan

    -, č. 566 (2006), s. 1-41 R&D Projects: GA MŠk LC542 Institutional research plan: CEZ:AV0Z70850503 Keywords : risk management * corporate insurance * moral hazard Subject RIV: AH - Economics http://fmg.lse.ac.uk/publications/searchdetail.php?pubid=1&wsid=1&wpdid=800

  3. Managing Climate Risk. Integrating Adaptation into World Bank Group Operations

    International Nuclear Information System (INIS)

    Van Aalst, M.

    2006-08-01

    Climate change is already taking place, and further changes are inevitable. Developing countries, and particularly the poorest people in these countries, are most at risk. The impacts result not only from gradual changes in temperature and sea level but also, in particular, from increased climate variability and extremes, including more intense floods, droughts, and storms. These changes are already having major impacts on the economic performance of developing countries and on the lives and livelihoods of millions of poor people around the world. Climate change thus directly affects the World Bank Group's mission of eradicating poverty. It also puts at risk many projects in a wide range of sectors, including infrastructure, agriculture, human health, water resources, and environment. The risks include physical threats to the investments, potential underperformance, and the possibility that projects will indirectly contribute to rising vulnerability by, for example, triggering investment and settlement in high-risk areas. The way to address these concerns is not to separate climate change adaptation from other priorities but to integrate comprehensive climate risk management into development planning, programs, and projects. While there is a great need to heighten awareness of climate risk in Bank work, a large body of experience on climate risk management is already available, in analytical work, in country dialogues, and in a growing number of investment projects. This operational experience highlights the general ingredients for successful integration of climate risk management into the mainstream development agenda: getting the right sectoral departments and senior policy makers involved; incorporating risk management into economic planning; engaging a wide range of nongovernmental actors (businesses, nongovernmental organizations, communities, and so on); giving attention to regulatory issues; and choosing strategies that will pay off immediately under current

  4. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  5. Perceptions of risk and risk management among 735 women who opted for a home birth.

    Science.gov (United States)

    Lindgren, Helena E; Rådestad, Ingela J; Christensson, Kyllike; Wally-Bystrom, Kristina; Hildingsson, Ingegerd M

    2010-04-01

    home birth is not included in the Swedish health-care system and the rate for planned home births is less than one in a thousand. The aim of this study was to describe women's perceptions of risk related to childbirth and the strategies for managing these perceived risks. a nationwide study including all women who had given birth at home in Sweden was conducted between 1 January 1992 and 31 July 2005. a total of 735 women had given birth to 1038 children. Of the 1038 questionnaires sent to the women, 1025 (99%) were returned. two open questions regarding risk related to childbirth and two questions answered using a scale were investigated by content analysis. regarding perceived risks about hospital birth, three categories, all related to loss of autonomy, were identified: (1) being in the hands of strangers; (2) being in the hands of routines and unnecessary interventions; and (3) being in the hands of structural conditions. Perceived risks related to a home birth were associated with a sense of being beyond help: (1) worst-case scenario; and (2) distance to the hospital. The perceived risks were managed by using extrovert activities and introvert behaviour, and by avoiding discussions concerning risks with health-care professionals. women who plan for a home birth in Sweden do consider risks related to childbirth but they avoid talking about the risks with health-care professionals. to understand why women choose to give birth at home, health-care professionals must learn about the perceived beneficial effect of doing so. Copyright 2008 Elsevier Ltd. All rights reserved.

  6. Imaging X-Ray Polarimetry Explorer (IXPE) Risk Management

    Science.gov (United States)

    Alexander, Cheryl; Deininger, William D.; Baggett, Randy; Primo, Attina; Bowen, Mike; Cowart, Chris; Del Monte, Ettore; Ingram, Lindsey; Kalinowski, William; Kelley, Anthony; hide

    2018-01-01

    The Imaging X-ray Polarimetry Explorer (IXPE) project is an international collaboration to build and fly a polarization sensitive X-ray observatory. The IXPE Observatory consists of the spacecraft and payload. The payload is composed of three X-ray telescopes, each consisting of a mirror module optical assembly and a polarization-sensitive X-ray detector assembly; a deployable boom maintains the focal length between the optical assemblies and the detectors. The goal of the IXPE Mission is to provide new information about the origins of cosmic X-rays and their interactions with matter and gravity as they travel through space. IXPE will do this by exploiting its unique capability to measure the polarization of X-rays emitted by cosmic sources. The collaboration for IXPE involves national and international partners during design, fabrication, assembly, integration, test, and operations. The full collaboration includes NASA Marshall Space Flight Center (MSFC), Ball Aerospace, the Italian Space Agency (ASI), the Italian Institute of Astrophysics and Space Planetology (IAPS)/Italian National Institute of Astrophysics (INAF), the Italian National Institute for Nuclear Physics (INFN), the University of Colorado (CU) Laboratory for Atmospheric and Space Physics (LASP), Stanford University, McGill University, and the Massachusetts Institute of Technology. The goal of this paper is to discuss risk management as it applies to the IXPE project. The full IXPE Team participates in risk management providing both unique challenges and advantages for project risk management. Risk management is being employed in all phases of the IXPE Project, but is particularly important during planning and initial execution-the current phase of the IXPE Project. The discussion will address IXPE risk strategies and responsibilities, along with the IXPE management process which includes risk identification, risk assessment, risk response, and risk monitoring, control, and reporting.

  7. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  8. A Discussion of a Risk-Sharing Pension Plan

    Directory of Open Access Journals (Sweden)

    Catherine Donnelly

    2017-02-01

    Full Text Available I show that risk-sharing pension plans can reduce some of the shortcomings of defined benefit and defined contributions plans. The risk-sharing pension plan presented aims to improve the stability of benefits paid to generations of members, while allowing them to enjoy the expected advantages of a risky investment strategy. The plan does this by adjusting the investment strategy and benefits in response to a changing funding level, motivated by the with-profits contract proposed by Goecke (2013. He suggests a mean-reverting log reserve (or funding ratio, where mean reversion occurs through adjustments to the investment strategy and declared bonuses. To measure the robustness of the plan to human factors, I introduce a measurement of disappointment, where disappointment is high when there are many consecutive years over which benefit payments are declining. Another measure introduced is devastation, where devastation occurs when benefit payments are zero. The motivation is that members of a pension plan who are easily disappointed or likely to get no benefit, are more likely to exit the plan. I find that the risk-sharing plan offers more disappointment than a defined contribution plan, but it eliminates the devastation possible in a plan that tries to accumulate contributions at a steadily increasing rate. The proposed risk-sharing plan can give a narrower range of benefits than in a defined contribution plan. Thus it can offer a stable benefit to members without the risk of running out of money.

  9. Risk assessment and management of radiofrequency radiation exposure

    Energy Technology Data Exchange (ETDEWEB)

    Dabala, Dana [Railways Medical Clinic Cluj-Napoca, Occupational Medicine Department, 16-20 Bilascu Gheorghe St., 400015 Cluj-Napoca (Romania); Surducan, Emanoil; Surducan, Vasile; Neamtu, Camelia [National Institute for Research and Development of Isotopic and Molecular Technologies, 65-103 Donath St., 400293 Cluj-Napoca (Romania)

    2013-11-13

    Radiofrequency radiation (RFR) industry managers, occupational physicians, security department, and other practitioners must be advised on the basic of biophysics and the health effects of RF electromagnetic fields so as to guide the management of exposure. Information on biophysics of RFR and biological/heath effects is derived from standard texts, literature and clinical experiences. Emergency treatment and ongoing care is outlined, with clinical approach integrating the circumstances of exposure and the patient's symptoms. Experimental risk assessment model in RFR chronic exposure is proposed. Planning for assessment and monitoring exposure, ongoing care, safety measures and work protection are outlining the proper management.

  10. Risk assessment and management of radiofrequency radiation exposure

    International Nuclear Information System (INIS)

    Dabala, Dana; Surducan, Emanoil; Surducan, Vasile; Neamtu, Camelia

    2013-01-01

    Radiofrequency radiation (RFR) industry managers, occupational physicians, security department, and other practitioners must be advised on the basic of biophysics and the health effects of RF electromagnetic fields so as to guide the management of exposure. Information on biophysics of RFR and biological/heath effects is derived from standard texts, literature and clinical experiences. Emergency treatment and ongoing care is outlined, with clinical approach integrating the circumstances of exposure and the patient's symptoms. Experimental risk assessment model in RFR chronic exposure is proposed. Planning for assessment and monitoring exposure, ongoing care, safety measures and work protection are outlining the proper management

  11. DOE`s integrated low-level waste management program and strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G. [Dept. of Energy, Washington, DC (United States). Office of Environmental Restoration and Waste Management; Hwang, J. [Science Applications International Corp., Germantown, MD (United States)

    1993-03-01

    To meet the DOE`s commitment to operate its facilities in a safe, economic, and environmentally sound manner, and to comply with all applicable federal, state, and local rules, regulations, and agreements, DOE created the Office of Environmental Restoration and Waste Management (EM) in 1989 to focus efforts on controlling waste management and cleaning up contaminated sites. In the first few years of its existence, the Office of Waste Management (EM-30) has concentrated on operational and corrective activities at the sites. In 1992, the Office of Waste Management began to apply an integrated approach to managing its various waste types. Consequently, DOE established the Low-Level Waste Management Program (LLWMP) to properly manage its complex-wide LLW in a consistent manner. The objective of the LLWMP is to build and operate an integrated, safe, and cost-effective program to meet the needs of waste generators. The program will be based on acceptable risk and sound planning, resulting in public confidence and support. Strategic planning of the program is under way and is expected to take two to three years before implementation of the integrated waste management approach.

  12. Risk communications and the Chemical Stockpile Emergency-Planning Program

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  13. Management and Risk Characteristics of Part-Time and Full-Time Farmers in Norway

    OpenAIRE

    Gudbrand Lien; Ola Flaten; Anne Moxnes Jervell; Martha Ebbesvik; Matthias Koesling; Paul Steinar Valle

    2006-01-01

    The objective of this exploratory study was to provide empirical insight into how different categories of farmers perceive and manage risk. The data originate from a questionnaire of dairy and crop farmers in Norway. The associations between part-time and full-time farming and farm and farmer characteristics, farmers' goals and future plans, risk perceptions, and risk management responses were examined with simple t- and chi-square tests, as well as with logistic regression. The results indic...

  14. Defense against terroristic hazards and risk by building planning law

    International Nuclear Information System (INIS)

    Hopkins, Richard

    2012-01-01

    The book on defense against terroristic hazards and risk by building planning law includes the following issues: Introduction: civil engineering and safety. Risk, hazards and urban planning: historical and actual examples for the constructional danger prevention, terroristic threat and urban planning. Risk, hazards and terrorism: sociology and risk, law and risk, terrorism - risk or hazard? Answer to uncertainty - risk prevention, catastrophe law as link. Risk, hazard, terrorism and the public building and regional planning law: regional planning law as point of origin, building law and terrorism, possibility of control by the legal building regulations.

  15. Risk Management of the Natural Gas Consumption using Genetic Algorithms

    Czech Academy of Sciences Publication Activity Database

    Pelikán, Emil; Šimůnek, Milan

    2005-01-01

    Roč. 15, - (2005), s. 425-436 ISSN 1210-0552 R&D Projects: GA AV ČR 1ET400300513 Institutional research plan: CEZ:AV0Z10300504 Keywords : forecasting * risk-management * energy consumption Subject RIV: BB - Applied Statistics, Operational Research

  16. Innovation in Management Plans for Community Conserved Areas: Experiences from Australian Indigenous Protected Areas

    Directory of Open Access Journals (Sweden)

    Jocelyn Davies

    2013-06-01

    Full Text Available Increasing attention to formal recognition of indigenous and community conserved areas (ICCAs as part of national and/or global protected area systems is generating novel encounters between the customary institutions through which indigenous peoples and local communities manage these traditional estates and the bureaucratic institutions of protected area management planning. Although management plans are widely considered to be important to effective management of protected areas, little guidance has been available about how their form and content can effectively reflect the distinctive socio-cultural and political characteristics of ICCAs. This gap has been particularly apparent in Australia where a trend to rapidly increased formal engagement of indigenous people in environmental management resulted, by 2012, in 50 indigenous groups voluntarily declaring their intent to manage all or part of their estates for conservation in perpetuity, as an indigenous protected area (IPA. Development and adoption of a management plan is central to the process through which the Australian Government recognizes these voluntary declarations and invests resources in IPA management. We identified four types of innovations, apparent in some recent IPA plans, which reflect the distinctive socio-cultural and political characteristics of ICCAs and support indigenous people as the primary decision makers and drivers of knowledge integration in IPAs. These are (1 a focus on customary institutions in governance; (2 strategic planning approaches that respond to interlinkages of stewardship between people, place, plants, and animals; (3 planning frameworks that bridge scales by considering values and issues across the whole of an indigenous people's territory; and (4 varied communication modes appropriate to varied audiences, including an emphasis on visual and spatial modes. Further research is warranted into how governance and management of IPAs, and the plans that

  17. Assessing habitat risk from human activities to inform coastal and marine spatial planning: a demonstration in Belize

    International Nuclear Information System (INIS)

    Arkema, Katie K; Wood, Spencer A; Ruckelshaus, Mary; Verutes, Gregory; Rosenthal, Amy; Bernhardt, Joanna R; Clarke, Chantalle; Rosado, Samir; Canto, Maritza; McField, Melanie; De Zegher, Joann

    2014-01-01

    Integrated coastal and ocean management requires transparent and accessible approaches for understanding the influence of human activities on marine environments. Here we introduce a model for assessing the combined risk to habitats from multiple ocean uses. We apply the model to coral reefs, mangrove forests and seagrass beds in Belize to inform the design of the country’s first Integrated Coastal Zone Management (ICZM) Plan. Based on extensive stakeholder engagement, review of existing legislation and data collected from diverse sources, we map the current distribution of coastal and ocean activities and develop three scenarios for zoning these activities in the future. We then estimate ecosystem risk under the current and three future scenarios. Current levels of risk vary spatially among the nine coastal planning regions in Belize. Empirical tests of the model are strong—three-quarters of the measured data for coral reef health lie within the 95% confidence interval of interpolated model data and 79% of the predicted mangrove occurrences are associated with observed responses. The future scenario that harmonizes conservation and development goals results in a 20% reduction in the area of high-risk habitat compared to the current scenario, while increasing the extent of several ocean uses. Our results are a component of the ICZM Plan for Belize that will undergo review by the national legislature in 2015. This application of our model to marine spatial planning in Belize illustrates an approach that can be used broadly by coastal and ocean planners to assess risk to habitats under current and future management scenarios. (letter)

  18. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  19. Methodology of environmental risk assessment management

    Directory of Open Access Journals (Sweden)

    Saša T. Bakrač

    2012-04-01

    . and industrial activities that may pose threats to ecosystems, flora, fauna and humans. This model-concept gives a three-phase assessment where the assessor tries to determine whether a specific place may be subject to assessment, to characterize the level of risk and to confirm or refute the findings of the first phase, collecting information and corrective measures, or to establish basic requirements for environment protection. Risk assessment methodology - American concept: The third methodological approach to environmental risk assessment is developed by the U.S. Agency for Environmental Protection, 'U.S. EPA'. This model primarily involves the implementation of environmental risk assessment under the conditions of anthropogenic impact on environment, without aiming at solving problems of natural environmental risks, although this methodology can be applied in this environment segment as well. The methodology gives a clear distinction between a scientific (phase of estimation and a non-scientific (planning part of assessment. The phases of estimation given by this model are: problem formulation, risk analysis and risk characterization. Conclusion: Concepts and methodologies of all three models-concepts of assessment are mostly reduced to a common goal: how to reduce existing or avoid potential risks. However, it should be noted that the implementation of appropriate management and ecological risk assessment does not guarantee that risks will be avoided or that the implementation of these processes will be successful.

  20. Impact of a risk management plan on Legionella contamination of dental unit water.

    Science.gov (United States)

    Leoni, Erica; Dallolio, Laura; Stagni, Francesca; Sanna, Tiziana; D'Alessandro, Giovanni; Piana, Gabriela

    2015-02-23

    The study aimed to assess the prevalence of Legionella spp. in dental unit waterlines of a dental clinic and to verify whether the microbiological parameters used as indicators of water quality were correlated with Legionella contamination. A risk management plan was subsequently implemented in the dental health care setting, in order to verify whether the adopted disinfection protocols were effective in preventing Legionella colonization. The water delivered from syringes and turbines of 63 dental units operating in a dental clinic, was monitored for counts of the heterotrophic bacteria P. aeruginosa and Legionella spp. (22 °C and 37 °C). At baseline, output water from dental units continuously treated with disinfection products was more compliant with the recommended standards than untreated and periodically treated water. However, continuous disinfection was still not able to prevent contamination by Legionella and P. aeruginosa. Legionella was isolated from 36.4%, 24.3% and 53.3% of samples from untreated, periodically and continuously treated waterlines, respectively. The standard microbiological parameters used as indicators of water quality proved to be unreliable as predictors of the presence of Legionella, whose source was identified as the tap water used to supply the dental units. The adoption of control measures, including the use of deionized water in supplying the dental unit waterlines and the application of a combined protocol of continuous and periodic disinfection, with different active products for the different devices, resulted in good control of Legionella contamination. The efficacy of the measures adopted was mainly linked to the strict adherence to the planned protocols, which placed particular stress on staff training and ongoing environmental monitoring.

  1. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  2. Lucas Heights buffer zone: plan of management

    International Nuclear Information System (INIS)

    1986-01-01

    This plan is being used by the Commission as a guide for its management of the Lucas Heights buffer zone, which is essentially a circular area having a 1-6 km radius around the HIFAR reactor. Aspects covered by this plan include past uses, current use, objectives for buffer zone land management, emergency evacuation, resource conservation, archaeology, fire, access, rehabilitation of disturbed areas, resource management and plan implementation

  3. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  4. Drought early warning and risk management in a changing environment

    Science.gov (United States)

    Pulwarty, R. S.

    2011-12-01

    Drought has long been recognized as falling into the category of incremental but long-term and cumulative environmental changes, also termed slow-onset or creeping events. These event types would include: air and water quality decline, desertification processes, deforestation and forest fragmentation, loss of biodiversity and habitats, and nitrogen overloading, among others. Climate scientists continue to struggle with recognizing the onset of drought and scientists and policy makers continue to debate the basis (i.e., criteria) for declaring an end to a drought. Risk-based management approaches to drought planning at the national and regional levels have been recommended repeatedly over the years but their prototyping, testing and operational implementation have been limited. This presentation will outline two avenues for disaster risk reduction in the context of drought (1) integrated early warning information systems, and (2) linking disaster risk reduction to climate change adaptation strategies. Adaptation involves not only using operational facilities and infrastructure to cope with the immediate problems but also leaving slack or reserve for coping with multiple stress problems that produce extreme impacts and surprise. Increasing the 'anticipatability' of an event, involves both monitoring of key indicators from appropriate baseline data, and observing early warning signs that assumptions in risk management plans are failing and critical transitions are occurring. Illustrative cases will be drawn from the IPCC Special Report on Managing the Risks of Extreme Events and Disasters (2011), the UN Global Assessment of Disaster Risk Reduction (2011) and implementation activities in which the author has been engaged. Most drought early warning systems have tended to focus on the development and use of physical system indicators and forecasts of trends and thresholds. We show that successful early warning systems that meet expectations of risk management also have

  5. Investigation of risk management auditing

    International Nuclear Information System (INIS)

    Cao Lu

    2012-01-01

    2004, COSO published 'Enterprise Risk Management Framework', 2009, SASAC issued the 'central enterprise-wide risk management guidelines' to promote risk management within the formal state-owned enterprises in medium and large. Nuclear Group, which risk management in all branches to carry out the project homeopathic, and A Ⅱ will carry out risk management program as the first unit has accumulated more experience. This article from the perspective of internal control, based on the company's risk management practices carried out to try for the nuclear power enterprise risk management audit to describe and propose new ideas. Which expounds the significance of risk management, audit, risk management audit of the ways and means, for practical application of risk management audit of a representative summary of the issues and the ways and means to solve the problem of forward-looking recommendations. (authors)

  6. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  7. Plans for Managing Hanford Remote Handled Transuranic (TRU) Waste

    International Nuclear Information System (INIS)

    MCKENNEY, D.E.

    2001-01-01

    The current Hanford Site baseline and life-cycle waste forecast predicts that approximately 1,000 cubic meters of remote-handled transuranic (RH-TRU) waste will be generated by waste management and environmental restoration activities at Hanford. These 1,000 cubic meters, comprised of both transuranic and mixed transuranic (TRUM) waste, represent a significant portion of the total estimated inventory of RH-TRU to be disposed of at the Waste Isolation Pilot Plant (WIPP). A systems engineering approach is being followed to develop a disposition plan for each RH-TRU/TRUM waste stream at Hanford. A number of significant decision-making efforts are underway to develop and finalize these disposition plans, including: development and approval of a RH-TRU/TRUM Waste Project Management Plan, revision of the Hanford Waste Management Strategic Plan, the Hanford Site Options Study (''Vision 2012''), the Canyon Disposal Initiative Record-of-Decision, and the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (SW-EIS). Disposition plans may include variations of several options, including (1) sending most RH-TRU/TRUM wastes to WIPP, (2) deferrals of waste disposal decisions in the interest of both efficiency and integration with other planned decision dates and (3) disposition of some materials in place consistent with Department of Energy Orders and the regulations in the interest of safety, risk minimization, and cost. Although finalization of disposition paths must await completion of the aforementioned decision documents, significant activities in support of RH-TRU/TRUM waste disposition are proceeding, including Hanford participation in development of the RH TRU WIPP waste acceptance criteria, preparation of T Plant for interim storage of spent nuclear fuel sludge, sharing of technology information and development activities in cooperation with the Mixed Waste Focus Area, RH-TRU technology demonstrations and deployments, and

  8. 76 FR 53149 - North American Waterfowl Management Plan

    Science.gov (United States)

    2011-08-25

    ... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...

  9. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  10. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  11. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  12. Oak Ridge National Laboratory Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  13. Agricultural risk management

    DEFF Research Database (Denmark)

    Lund, Mogens; Oksen, Arne; Larsen, Torben U.

    2005-01-01

    A new model for risk management in agriculture is described in the paper. The risk model is constructed as a context dependent process, which includes four main phases. The model is aimed at agricultural advisors, who wish to facilitate and disseminate risk management to farmers. It is developed...... and tested by an action research approach in an attempt to make risk management more applicable on family farms. Our obtained experiences indicate that farmers don’t apply probabilistic thinking and other concepts according to formal decision theory....

  14. Quantifying the geopolitical dimension of energy risks: A tool for energy modelling and planning

    International Nuclear Information System (INIS)

    Muñoz, Beatriz; García-Verdugo, Javier; San-Martín, Enrique

    2015-01-01

    Energy risk and security are topical issues in energy analysis and policy. However, the quantitative analysis of energy risk presents significant methodological difficulties, especially when dealing with certain of its more qualitative dimensions. The aim of this paper is to quantitatively estimate the geopolitical risk of energy supply with the help of a multivariate statistical technique, factor analysis. Four partial energy risk factors were computed for 122 countries, which were subsequently aggregated to form the composite GESRI (Geopolitical Energy Supply Risk Index). The results demonstrate that advanced economies present a lower level of geopolitical energy risk, especially countries with energy resources, while less-developed countries register higher levels of risk regardless of their energy production. Although this indicator is computed for countries, it can be aggregated for regions or corridors, and it could also be applied to model and scenario building. The different uses of the GESRI could eventually lead to practical implications in the energy policy field, as well as in the energy planning and energy management areas. - Highlights: • We quantitatively estimate the multidimensional geopolitical risk of energy supply. • Factor analysis was used to reveal energy risk, a variable not directly observable. • Advanced economies with energy resources present the lowest level of energy risk. • Less-developed countries obtain high risk values even when they are energy producers. • The proposed index can be used for energy planning and energy management purposes

  15. Uncertainty and Risk Management in Cyber Situational Awareness

    Science.gov (United States)

    Li, Jason; Ou, Xinming; Rajagopalan, Raj

    Handling cyber threats unavoidably needs to deal with both uncertain and imprecise information. What we can observe as potential malicious activities can seldom give us 100% confidence on important questions we care about, e.g. what machines are compromised and what damage has been incurred. In security planning, we need information on how likely a vulnerability can lead to a successful compromise to better balance security and functionality, performance, and ease of use. These information are at best qualitative and are often vague and imprecise. In cyber situational awareness, we have to rely on such imperfect information to detect real attacks and to prevent an attack from happening through appropriate risk management. This chapter surveys existing technologies in handling uncertainty and risk management in cyber situational awareness.

  16. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  17. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  18. Commodity risk management

    Directory of Open Access Journals (Sweden)

    Hilary Till

    2016-09-01

    Full Text Available This article discusses the practical issues involved in applying a disciplined risk management methodology to commodity futures trading. Accordingly, the paper shows how to apply methodologies derived from both conventional asset management and hedge fund management to futures trading. The article also discusses some of the risk management issues that are unique to leveraged futures trading.

  19. Overview of the plant risk status information management system

    International Nuclear Information System (INIS)

    Kirchner, J.R.; Campbell, D.J.

    1987-01-01

    The Plant Risk Status Information Management System (PRISIM) is a personal computer program that presents PRA results and related information for use by decision-makers. The program was originally developed for NRC inspectors, but now an expanded version of the program with more potential applications is complete. Prototypes of both versions have been developed for Arkansas Nuclear One - Unit 1, and the inspection-related version is currently being field-tested. Interim results of these field tests are favorable. The PRISIM database contains both pre-processed information that is useful for long-term planning and a plant risk model for assessing the risk implications of the current plant status. The program provides rapid access to specific information by making extensive use of menus. Development of PRISIM programs for Peach Bottom-Unit 2 is underway, and there are plans to create programs for other plants

  20. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  1. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  2. Information security risk management and incompatible parts of organization

    Energy Technology Data Exchange (ETDEWEB)

    Talabeigi, E.; Naeeini, S.G.J.

    2016-07-01

    Purpose: we prepared a questionnaire to evaluate Incompatible parts and also risk management in University of Science and Technology E-Learning Center and studying the Incompatible parts impacts on utility of organization. Design/methodology/approach: By using coalitional game theory we present a new model to recognize the degrees of incompatibility among independent divisions of an organization with dependent security assets. Based on positive and negative interdependencies in the parts, the model provides how the organization can decrease the security risks through non-cooperation rather than cooperation. we implement the proposed model of this paper by analyzing the data which have been provided by questionnaires from different three managers' ideas of Iran University of Science and Technology E-Learning Center located in Iran University of Science and Technology, Tehran, Iran. Findings: In general, by collecting data and analyzing them, the survey showed that Incompatible parts of organizations have negative impacts on utility of organization risk management process. Furthermore, it adds values to other organizations and provides the best practices in planning, developing, implementing and monitoring risk management in organizations. Research limitations/implications: Since Information security and also Risk Management are still areas which need to improve in some Iranian universities, we couldn’t consider them in our analysis. On the other hand, due to questionnaire limitation, the study’s sample size is 1. This size may be considered large for our statistical analysis. Originality/value: The main contribution of this paper is to propose a model for non-cooperation among a number of divisions in a organization and using risk management factors.

  3. Information security risk management and incompatible parts of organization

    International Nuclear Information System (INIS)

    Talabeigi, E.; Naeeini, S.G.J.

    2016-01-01

    Purpose: we prepared a questionnaire to evaluate Incompatible parts and also risk management in University of Science and Technology E-Learning Center and studying the Incompatible parts impacts on utility of organization. Design/methodology/approach: By using coalitional game theory we present a new model to recognize the degrees of incompatibility among independent divisions of an organization with dependent security assets. Based on positive and negative interdependencies in the parts, the model provides how the organization can decrease the security risks through non-cooperation rather than cooperation. we implement the proposed model of this paper by analyzing the data which have been provided by questionnaires from different three managers' ideas of Iran University of Science and Technology E-Learning Center located in Iran University of Science and Technology, Tehran, Iran. Findings: In general, by collecting data and analyzing them, the survey showed that Incompatible parts of organizations have negative impacts on utility of organization risk management process. Furthermore, it adds values to other organizations and provides the best practices in planning, developing, implementing and monitoring risk management in organizations. Research limitations/implications: Since Information security and also Risk Management are still areas which need to improve in some Iranian universities, we couldn’t consider them in our analysis. On the other hand, due to questionnaire limitation, the study’s sample size is 1. This size may be considered large for our statistical analysis. Originality/value: The main contribution of this paper is to propose a model for non-cooperation among a number of divisions in a organization and using risk management factors.

  4. 40 CFR 763.93 - Management plans.

    Science.gov (United States)

    2010-07-01

    ... implementation in a timely fashion. (d) Each local education agency shall maintain and update its management plan... surveillance and training. (12) With respect to each consultant who contributed to the management plan, the name of the consultant and one of the following statements: (i) If the State has adopted a contractor...

  5. Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations

  6. Internal Audit and Risk Management

    OpenAIRE

    Constantin Nicolae Vasile; Alexandru Georgiana

    2011-01-01

    Internal audit and risk management have the same goal: the control of risk. There are various roles for the internal audit in respect of risk management. The main limitations of internal audit in respect of risk management regards assuming risk management tasks. One of the main issues regarding risk management is to make sure that the key risks are taken into consideration and that the management and the board of the organization take action as needed. Internal audit could give advice to mana...

  7. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  8. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  9. Hog Producers' Risk Management Attitudes and Desire for Additional Risk Management Education

    OpenAIRE

    Patrick, George F.; Peiter, Amy J.; Knight, Thomas O.; Coble, Keith H.; Baquet, Alan E.

    2007-01-01

    Hog producers in Indiana and Nebraska were surveyed about sources of risk, effectiveness of risk management strategies, and prior participation in and desire for additional risk management education. Ownership of hogs by the producer, size of the operation, and age did have significant effects on ratings of both sources of risk and effectiveness of risk management strategies. Probit analysis found age, prior attendance, knowledge and prior use of the tool, level of integration, and concern ab...

  10. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  11. Quality risk management during pharmaceutical ‘good distribution practices’ – A plausible solution

    Directory of Open Access Journals (Sweden)

    Nirmal Kumar

    2018-06-01

    Full Text Available Quality of medicinal product is an important facet throughout lifecycle owing to its importance as acceptance criteria at customer’s end. Drugs regulatory agencies have issued guidelines for quality risk evaluation, mitigation and review management. Quality risk management has become an integral part of quality management system at manufacturing plants. Procedures for deviation control, change control, investigations of market complaints and batch failures are dealt with the principle of quality risk management at the manufacturing facility. The exploratory study shows a dearth of research on quality risk management during supply chain operation, however, a few study has been carried out by keeping financial risk into account. This study addresses the gap in literature on quality risk management during supply chain operations. There are cases of unresolved customer complaints and batch failures originated due to inadequacies during distribution of pharmaceutical products. In absence of established quality risk management system during product shipment, there is no effective preventive plan related to risk factors. A corollary of manufacturing quality risk management has been drawn to the distribution of pharmaceutical products through this study. The quality risk management during pharmaceutical distribution may be useful to avoid market complaints, drug recalls, and regulatory actions. This study produces one unique model solution for industry professionals and policymakers opening a scope to reduce the product rejection thereby paving the way for substantial business growth.

  12. Feedback on flood risk management

    Science.gov (United States)

    Moreau, K.; Roumagnac, A.

    2009-09-01

    For several years, as floods were increasing in South of France, local communities felt deprive to assume their mission of protection and information of citizens, and were looking for assistance in flood management. In term of flood disaster, the fact is that physical protection is necessary but inevitably limited. Tools and structures of assistance to anticipation remain slightly developed. To manage repeated crisis, local authorities need to be able to base their policy against flood on prevention, warnings, post-crisis analysis and feedback from former experience. In this objective, after 3 years of test and improvement since 2003, the initiative Predict-Services was developped in South of France: it aims at helping communities and companies to face repeated flood crisis. The principle is to prepare emergency plans, to organize crisis management and reduce risks; to help and assist communities and companies during crisis to activate and adapt their emergency plans with enough of anticipation; and to analyse floods effects and improve emergency plans afterwards. In order to reduce risks, and to keep the benefits of such an initiative, local communities and companies have to maintain the awareness of risk of the citizens and employees. They also have to maintain their safety plans to keep them constantly operational. This is a part of the message relayed. Companies, Local communities, local government authorities and basin stakeholders are the decision makers. Companies and local communities have to involve themselves in the elaboration of safety plans. They are also completely involved in their activation that is their own responsability. This applies to other local government authorities, like districts one's and basin stakeholders, which participle in the financing community safety plans and adminitrative district which are responsible of the transmission of meteorological alert and of rescue actions. In the crossing of the géo-information stemming from the

  13. A data-driven approach to quality risk management.

    Science.gov (United States)

    Alemayehu, Demissie; Alvir, Jose; Levenstein, Marcia; Nickerson, David

    2013-10-01

    An effective clinical trial strategy to ensure patient safety as well as trial quality and efficiency involves an integrated approach, including prospective identification of risk factors, mitigation of the risks through proper study design and execution, and assessment of quality metrics in real-time. Such an integrated quality management plan may also be enhanced by using data-driven techniques to identify risk factors that are most relevant in predicting quality issues associated with a trial. In this paper, we illustrate such an approach using data collected from actual clinical trials. Several statistical methods were employed, including the Wilcoxon rank-sum test and logistic regression, to identify the presence of association between risk factors and the occurrence of quality issues, applied to data on quality of clinical trials sponsored by Pfizer. ONLY A SUBSET OF THE RISK FACTORS HAD A SIGNIFICANT ASSOCIATION WITH QUALITY ISSUES, AND INCLUDED: Whether study used Placebo, whether an agent was a biologic, unusual packaging label, complex dosing, and over 25 planned procedures. Proper implementation of the strategy can help to optimize resource utilization without compromising trial integrity and patient safety.

  14. A data-driven approach to quality risk management

    Directory of Open Access Journals (Sweden)

    Demissie Alemayehu

    2013-01-01

    Full Text Available Aim: An effective clinical trial strategy to ensure patient safety as well as trial quality and efficiency involves an integrated approach, including prospective identification of risk factors, mitigation of the risks through proper study design and execution, and assessment of quality metrics in real-time. Such an integrated quality management plan may also be enhanced by using data-driven techniques to identify risk factors that are most relevant in predicting quality issues associated with a trial. In this paper, we illustrate such an approach using data collected from actual clinical trials. Materials and Methods: Several statistical methods were employed, including the Wilcoxon rank-sum test and logistic regression, to identify the presence of association between risk factors and the occurrence of quality issues, applied to data on quality of clinical trials sponsored by Pfizer. Results: Only a subset of the risk factors had a significant association with quality issues, and included: Whether study used Placebo, whether an agent was a biologic, unusual packaging label, complex dosing, and over 25 planned procedures. Conclusion: Proper implementation of the strategy can help to optimize resource utilization without compromising trial integrity and patient safety.

  15. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  16. Certification and risk management

    International Nuclear Information System (INIS)

    Villanueva Fernandez, M.

    2015-01-01

    Nowadays more organizations are increasingly aware of the importance of properly managing the uncertainty of its activities and build competitive advantages through the identification, assessment and management of risks that they face. Risk management is also an aspect of great importance within the new version of ISO fact it is one of the most innovative and also the most laborious, because an appropriate risk management achieves expected results and customer satisfaction. In conclusion, risk management is a new field of business and can be considered a cross-cutting component for other relevant factors of organizational change management. (Author)

  17. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  18. Nurse manager succession planning: A cost-benefit analysis.

    Science.gov (United States)

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  19. Plans to adapt Point Lepreau ageing management to new industry guidelines

    International Nuclear Information System (INIS)

    Greenlaw, G.; Gendron, T.; Slade, J.; Rankin, B.

    2008-01-01

    In preparation for PLGS life extension, NBPN spent considerable effort to evaluate the impact of ageing and to develop ageing management processes to maintain the required safety functions for extended operation. These were based on INPO AP-913. Recently, the CNSC has been developing Canadian ageing management guidelines in line with the IAEA approach. In response, NBPN plans to document how current PLGS processes meet the new CNSC guidelines and to identify any areas for improvement. Best practices from utilities that have retrofitted IAEA guidelines and PLGS experience in applying risk-based methods for ageing management will be used to implement improvements. (author)

  20. The Strategies to Reduce Injuries and Develop Confidence in Elders Intervention: Falls Risk Factor Assessment and Management, Patient Engagement, and Nurse Co-management.

    Science.gov (United States)

    Reuben, David B; Gazarian, Priscilla; Alexander, Neil; Araujo, Katy; Baker, Dorothy; Bean, Jonathan F; Boult, Chad; Charpentier, Peter; Duncan, Pamela; Latham, Nancy; Leipzig, Rosanne M; Quintiliani, Lisa M; Storer, Thomas; McMahon, Siobhan

    2017-12-01

    In response to the epidemic of falls and serious falls-related injuries in older persons, in 2014, the Patient Centered Outcomes Research Institute (PCORI) and the National Institute on Aging funded a pragmatic trial, Strategies to Reduce Injuries and Develop confidence in Elders (STRIDE) to compare the effects of a multifactorial intervention with those of an enhanced usual care intervention. The STRIDE multifactorial intervention consists of five major components that registered nurses deliver in the role of falls care managers, co-managing fall risk in partnership with patients and their primary care providers (PCPs). The components include a standardized assessment of eight modifiable risk factors (medications; postural hypotension; feet and footwear; vision; vitamin D; osteoporosis; home safety; strength, gait, and balance impairment) and the use of protocols and algorithms to generate recommended management of risk factors; explanation of assessment results to the patient (and caregiver when appropriate) using basic motivational interviewing techniques to elicit patient priorities, preferences, and readiness to participate in treatments; co-creation of individualized falls care plans that patients' PCPs review, modify, and approve; implementation of the falls care plan; and ongoing monitoring of response, regularly scheduled re-assessments of fall risk, and revisions of the falls care plan. Custom-designed falls care management software facilitates risk factor assessment, the identification of recommended interventions, clinic note generation, and longitudinal care management. The trial testing the effectiveness of the STRIDE intervention is in progress, with results expected in late 2019. © 2017, Copyright the Authors Journal compilation © 2017, The American Geriatrics Society.

  1. Managing climate change risk : emerging financial sector expectations

    International Nuclear Information System (INIS)

    Williams, R.

    2004-01-01

    Engagement of the financial sector in the climate change debate is apparent, with social investors and advocacy groups launching 32 climate change related shareholder resolutions with American and Canadian energy companies in 2003. Eos Research and Consulting Ltd. recently conducted a study to examine emerging standards for how energy companies manage climate change related risks. A survey was conducted in the first part of the study to determine the environmental awareness of energy companies. Financial firms were asked whether they sought information concerning GHG inventories; projections of future emissions; action plans for addressing climate change and energy efficiency; evaluation of relative risk; estimation of cost of carbon; assessment of financial impact; evaluation of future regulations; and emissions trading activity. The second part of the study compared the response of 11 leading energy companies. The result was 2 opposing views on how climate change risks should be managed. The survey revealed that while most mainstream financial institutions are not paying much attention to climate change issues, socially responsible investment (SRI) investors are aware and working to factor climate change risk management information into their activities. In addition, SRI is growing at a faster pace than other investment segments, which may lead to greater future expectations for energy companies' climate change risk management efforts. It was concluded that the financial sector may emerge as an important source of direction that will guide energy companies in their future efforts to manage climate change risks. The five trends that contribute to the sector's emerging role are the continuing influence of advocacy groups; evolution of socially responsible approaches to investment; growing concerns for reputation; development of financial risk assessment approaches in terms of climate change; and, increase focus on corporate governance issues. 15 refs., 2 tabs., 1

  2. Social and environmental issues in developing vegetation and fire management plans

    Science.gov (United States)

    Leonard Charles

    1995-01-01

    To reduce the risk of wildfire in the California urban interface often requires actions that will be viewed by members of the public as having adverse effects on such resources as wildlife, vegetation, views, air quality, and recreational opportunities. These citizens can substantially delay and even thwart development of fire management plans. In developing such a...

  3. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  4. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  5. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  6. Risk management in Takaful

    OpenAIRE

    Akhter, Waheed

    2010-01-01

    Risk management is of vital importance in Islam and Takāful provides a way to manage risks in business according to Sharī’ah principles. This research paper attempts to identify various types of risks involved in Takāful business that affect operational and investment functions of Takāful operators across the globe. It lays down criteria for Takāful operator to manage those risks effectively. However, Takāful operators often face difficulty in managing market and credit risks as Sharī’ah comp...

  7. Assessment of hazards and risks for landscape protection planning in Sicily.

    Science.gov (United States)

    La Rosa, Daniele; Martinico, Francesco

    2013-09-01

    Landscape protection planning is a complex task that requires an integrated assessment and involves heterogeneous issues. These issues include not only the management of a considerable amount of data to describe landscape features but also the choice of appropriate tools to evaluate the hazards and risks. The landscape assessment phase can provide fundamental information for the definition of a Landscape Protection Plan, in which the selection of norms for protection or rehabilitation is strictly related to hazards, values and risks that are found. This paper describes a landscape assessment methodology conducted by using GIS, concerning landscape hazards, values and risk. Four hazard categories are introduced and assessed concerning urban sprawl and erosion: landscape transformations by new planned developments, intensification of urban sprawl patterns, loss of agriculture land and erosion. Landscape value is evaluated by using different thematic layers overlaid with GIS geoprocessing. The risk of loss of landscape value is evaluated, with reference to the potential occurrence of the previously assessed hazards. The case study is the Province of Enna (Sicily), where landscape protection is a relevant issue because of the importance of cultural and natural heritage. Results show that high value landscape features have a low risk of loss of landscape value. For this reason, landscape protection policies assume a relevant role in landscapes with low-medium values and they should be addressed to control the urban sprawl processes that are beginning in the area. Copyright © 2012 Elsevier Ltd. All rights reserved.

  8. Information Value Distance and Crisis Management Planning

    Directory of Open Access Journals (Sweden)

    Brahim Herbane

    2014-04-01

    Full Text Available Organizational learning during and post-crisis is well established in the management literature but consideration of learning for crisis and the sources of information perceived to be useful for crisis management planning have not previously been examined. This study evaluates data from 215 U.K.-based small- and medium-sized enterprises (SMEs about the perceived value of 11 sources of information between planning (i.e., firms with a crisis management plan and non-planning respondents. For planning firms, the information sources considered to be useful are exclusively experience-based, and when information sources become less idiosyncratic and episodic, planning firms’ evaluations of their value begin to approximate the ratings given by non-planning firms. Furthermore, the concepts of relative value distance and value distance from threshold are original features of this study and offer new ways to evaluate the value of information sources for organizations wishing to provide information and support to improve business resilience and business continuity.

  9. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  10. 49 CFR 633.25 - Contents of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  11. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  12. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  13. Governmental management of chemical risk

    International Nuclear Information System (INIS)

    Zimmerman, R.

    1990-01-01

    This book is organized under the following headings: risk management in the government context; legal and regulatory decrees and directives for managing chemical risk; incentive-based approaches for regulating risk; risk management in the federal system; and traditional approaches and new initiatives for managing chemical risk

  14. Managing the risks of risk management on large fires

    Science.gov (United States)

    Donald G. MacGregor; Armando González-Cabán

    2013-01-01

    Large fires pose risks to a number of important values, including the ecology, property and the lives of incident responders. A relatively unstudied aspect of fire management is the risks to which incident managers are exposed due to organizational and sociopolitical factors that put them in a position of, for example, potential liability or degradation of their image...

  15. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... 219 National Forest System Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning AGENCY... Agriculture is adopting a new National Forest System land management planning rule (planning rule). The new...

  16. Ecological risk Evaluation and Green Infrastructure planning for coping with global climate change, a case study of Shanghai, China

    Science.gov (United States)

    Li, Pengyao; Xiao, He; Li, Xiang; Hu, Wenhao; Gu, Shoubai; Yu, Zhenrong

    2018-01-01

    Coping with various ecological risks caused by extreme weather events of global climate change has become an important issue in regional planning, and storm water management for sustainable development. In this paper, taking Shanghai, China as a case study, four potential ecological risks were identified including flood disaster, sea-source disaster, urban heat island effect, and land subsidence. Based on spatial database, the spatial variation of these four ecological risks was evaluated, and the planning area was divided into seven responding regions with different green infrastructure strategy. The methodology developed in this study combining ecological risk evaluation with spatial regionalization planning could contribute to coping with global climate change.

  17. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  18. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  19. Risk management in customs control

    OpenAIRE

    Drobot, Elena; Klevleeva, Aziza

    2016-01-01

    The particularities of risk-management system implementation within customs control are discussed in the article. The authors single out the elements of risk-management system, evaluate effectiveness of risk-management in customs control. The main reasons for non-implementation of risk-management system in customs control are described, as well. Particular attention is paid to the benefits of customs risk management.

  20. 40 CFR 60.2899 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  1. Financial Risk Management

    OpenAIRE

    Catalin-Florinel Stanescu; Laurentiu Mircea Simion

    2011-01-01

    Concerns about the financial risk is increasing. In this climate, companies of all types and sizes want a robust framework for financial risk management to meet compliance requirements, contribute to better decision making and increase performance. Financial risk management professionals working with financial institutions and other corporate clients to achieve these objectives.

  2. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  3. Considering Risk Associated with the Realization of Waste Management Investment Plans in Cracow

    Directory of Open Access Journals (Sweden)

    Hajduga Gabriela

    2017-01-01

    Full Text Available To fulfill obligations to the European Union on waste management, the authorities of the city of Cracow, decided to build a waste incineration plant. Such investment involves considerable risks, not only financial but also social. The paper conducted a risk analysis based on the index net present value, identifies factors which are particularly exposed, and proposes solutions for reducing its level.

  4. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendment. SUMMARY: This..., revising, and monitoring land management plans (the planning rule). The National Forest Management Act... Land Management Planning Rule Final Programmatic Environmental Impact Statement of January 2012. List...

  5. People's Risk Recognition Preceding Evacuation and Its Role in Demand Modeling and Planning

    NARCIS (Netherlands)

    Urata, Junji; Pel, A.J.

    2017-01-01

    Evacuation planning and management involves estimating the travel demand in the event that such action is required. This is usually done as a function of people's decision to evacuate, which we show is strongly linked to their risk awareness. We use an empirical data set, which shows tsunami

  6. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    Science.gov (United States)

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  7. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  8. Classification of risks in the process of financial planning

    Directory of Open Access Journals (Sweden)

    A.V. Overchuk

    2017-12-01

    Full Text Available The essence of the concept «risk» in the process of financial planning is studied. The classification of risks was conducted. The article provides the full enough and detailed system of classification of risks in the process of financial planning. The author researches and provides the factors, which directly influence upon the size of risks, which accompany the process of financial planning. A complete set of isolated independent features was determined for each risk type. It was found out that a part of features depends only on the risk type and the other part is determined by the character of a risky situation. The article substantiates the presence of indeterminacy typical for dynamic and non-stationary environment and the risks of different nature and strength of influence on the efficiency of financial planning, which cause the necessity to develop and implement the effective system of financial planning at an enterprise.

  9. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  10. Optimizing risk management

    International Nuclear Information System (INIS)

    Kindred, G.W.

    2000-01-01

    Commercial nuclear power plant management is focussed on the safe, efficient, economical production of electricity. To accomplish the safe aspect of the equation, risk must be determined for the operation and maintenance of the facility. To accomplish the efficient aspect of the equation, management must understand those risks and factor risk insights into their decision process. The final piece of the equation is economical which is accomplished by minimizing, plant outage durations and proper utilization of resources. Probabilistic Risk Assessment can provide the risk insights to accomplish all three; safety, efficiency, and economically. How? Safe production of electricity can be quantified by use of PRA modeling and other risk insights that can determine the core damage frequency. Efficient production of electricity can be influenced by providing management with quantified risk insights for use in decision making. And, one example of economical production of electricity is by not having over conservative deterministic based defense in depth approaches to system maintenance and availability. By using risk-informed insights nuclear safety can be quantified and risk can be managed. Confidence in this approach can be achieved by ensuring the content and quality of the PRA is standardized throughout the industry. The time has arrived for Probabilistic Risk Assessment to take an active position as a major role player in the safe, efficient, and economical operation of commercial nuclear power plants. (author)

  11. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  12. Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    1999-05-12

    The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

  13. Risk management and safety

    International Nuclear Information System (INIS)

    Niehaus, F.; Novegno, A.

    1985-01-01

    Risk assessment, including probabilistic analyses, has made great progress over the past decade. In spite of the inherent uncertainties it has now become possible to utilize methods and results for decision making at various levels. This paper will, therefore, review risk management in industrial installations, risk management for energy safety policy and prospects of risk management in highly industrialized areas. (orig.) [de

  14. Risk management of allergenic food ingredients in hospitality

    Directory of Open Access Journals (Sweden)

    Popov-Raljić Jovanka

    2017-01-01

    Full Text Available Food allergens have appeared in the last two decades as a concealed form of threat which significantly endangers public health, and their labelling on food products, drinks, and non pre-packed gastro-products is clearly defined with legal regulations. In practice, the chemical risk management is faced with several unexpected problems. Some of them are declarations or statements about allergenic ingredients, where a nutritional allergen that the food contains is labelled with an unusual name, or similar products from different manufacturers where one is safe and the other contains allergens. A hospitality facility which deals with production and distribution of unpackaged foods should, in addition to a developed HACCP concept and standardized recipes for food preparation, prepare a detailed, precise, and clearly defined plan for management of chemical risks.

  15. 40 CFR 60.2055 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  16. Use of documentary sources on past flood events for flood risk management and land planning

    Science.gov (United States)

    Cœur, Denis; Lang, Michel

    2008-09-01

    The knowledge of past catastrophic events can improve flood risk mitigation policy, with a better awareness against risk. As such historical information is usually available in Europe for the past five centuries, historians are able to understand how past society dealt with flood risk, and hydrologists can include information on past floods into an adapted probabilistic framework. In France, Flood Risk Mitigation Maps are based either on the largest historical known flood event or on the 100-year flood event if it is greater. Two actions can be suggested in terms of promoting the use of historical information for flood risk management: (1) the development of a regional flood data base, with both historical and current data, in order to get a good feedback on recent events and to improve the flood risk education and awareness; (2) the commitment to keep a persistent/perennial management of a reference network of hydrometeorological observations for climate change studies.

  17. Management of Cardiovascular Risk in Patients with Chronic Inflammatory Diseases

    DEFF Research Database (Denmark)

    Lindhardsen, Jesper; Kristensen, Søren Lund; Ahlehoff, Ole

    2016-01-01

    An increased risk of cardiovascular disease (CVD) has been observed in a range of chronic inflammatory diseases (CID), including rheumatoid arthritis (RA), psoriasis, inflammatory bowel diseases (IBD), and systemic lupus erythematosus (SLE). The increased risk of CVDs and reduced life expectancy...... considerable interest in recent years. We briefly summarize the current level of evidence of the association between CIDs and CVD and cardiovascular risk management recommendations. Perspectives of ongoing and planned trials are discussed in consideration of potential ways to improve primary and secondary CVD...

  18. Integral Risk Management for DBFM Tenders and Contracts in the Netherlands

    NARCIS (Netherlands)

    Wong, J.; Berkelaar, R.; Pekelharing, H.

    2015-01-01

    This paper presents an overview of an integral risk management approach with emphasis on the relationships with the costing and scheduling processes. Forms of uncertainty related to project planning are classified and implemented in the probabilistic costing and scheduling processes. Furthermore,

  19. Information security risk management and incompatible parts of organization

    Directory of Open Access Journals (Sweden)

    Elham Talabeigi

    2016-11-01

    Full Text Available Purpose: we prepared a questionnaire to evaluate Incompatible parts and also risk management in University of Science and Technology E-Learning Center and studying the Incompatible parts impacts on utility of organization. Design/methodology/approach: By using coalitional game theory we present a new model to recognize the degrees of incompatibility among independent divisions of an organization with dependent security assets. Based on positive and negative interdependencies in the parts, the model provides how the organization can decrease the security risks through non-cooperation rather than cooperation. we implement the proposed model of this paper by analyzing the data which have been provided by questionnaires from different three managers' ideas of Iran University of Science and Technology E-Learning Center located in Iran University of Science and Technology, Tehran, Iran. Findings: In general, by collecting data and analyzing them, the survey showed that Incompatible parts of organizations have negative impacts on utility of organization risk management process. Furthermore, it adds values to other organizations and provides the best practices in planning, developing, implementing and monitoring risk management in organizations. Research limitations/implications: Since Information security and also Risk Management are still areas which need to improve in some Iranian universities, we couldn’t consider them in our analysis. On the other hand, due to questionnaire limitation, the study’s sample size is 1. This size may be considered large for our statistical analysis. Originality/value:  The main contribution of this paper is to propose a model for non-cooperation among a number of divisions in a organization and using risk management factors.

  20. Overtopping hazards to port activities: Application of a new methodology to risk management (POrt Risk MAnagement Tool)

    International Nuclear Information System (INIS)

    Alises, Ana; Molina, Rafael; Gómez, Rebeca; Pery, Pascual; Castillo, Carmen

    2014-01-01

    In the past 20 years, the need of ports to serve a fleet whose dimensions are continuously increasing due to economies of scale, has derived on a port infrastructures growth with a trend to look for greater drafts at deeper waters and therefore the protection structures built in the last years have been increasingly exposed to severer maritime climate action. Consequently, overtopping phenomenon has been identified as a potential risk factor able to cause structural damages and operative failure modes to vulnerable economic activities located at these port facilities. Port activities must be developed ensuring operative and safety conditions what imply reducing uncertainties of overtopping phenomena by using prediction methods which may allow overtopping risk management. This paper provides a risk assessment methodology which is integrated into an overtopping risk management framework to cope with safety problems in port exploitation. Overtopping risk value is measured by combining probability of occurrence of an undesirable event together with its consequences, estimated in terms of costs or delays and given in base of the vulnerability of the affected port system. The development of this methodology is described and finally applied to a real case study what seems to reinforce the validity of the proposed method to overtopping risk assessment. - Highlights: • Infrastructure risk assessment involves both probabilistic and economic techniques. • Risk equation is posed by the combination of probability, vulnerability and cost. • Port infrastructures' vulnerability level depends on climate agents' action. • Economic value of natural hazards consequences is linked with vulnerability level. • Project planning process should be done taking into account the project's risk distribution

  1. The risks of liability for former mine operators: the implementation of a plan for preventing legal risks

    International Nuclear Information System (INIS)

    Martinet, Y.

    2004-01-01

    Shutting down mines has 'mechanically' increased the risks of cave-ins. The local (communal and/or departmental) administrations responsible for supervising the situation do not necessarily have the means for managing shafts and tunnels. For this reason, two acts were passed in 1994 and 1999 to reform how mines are managed after shutdowns. Managing post-mining operations has spawned lawsuits against former operators, even though they shut down their mines in compliance with the laws and regulations in force at the time. By virtue of these two acts, administrative authorities are now trying to make the former operators fill in shafts and tunnels. Moreover, individuals often try to obtain compensation for the damages caused by shut-down mines. This situation causes uncertainty for various parties; and the legal settlements being proposed are not sufficiently clear. Information is provided for thinking about how to implement a 'legal risk prevention plan', which former mine operators should bear in mind. (author)

  2. Risk management of knowledge loss in nuclear industry organizations

    International Nuclear Information System (INIS)

    2006-07-01

    Maintaining nuclear competencies in the nuclear industry and nuclear regulatory authorities will be one of the most critical challenges in the near future. As many nuclear experts around the world are retiring, they are taking with them a substantial amount of knowledge and corporate memory. The loss of such employees who hold knowledge critical to either operations or safety poses a clear internal threat to the safe and reliable operation of nuclear facilities. This publication is intended for senior and middle level managers of nuclear industry operating organizations and provides practical information on knowledge loss risk management. The information provided in this it is based upon the actual experiences of Member State operating organizations and is intended to increase awareness of the need to: develop a strategic approach and action plans to address the potential loss of critical knowledge and skills; provide processes and in conducting risk assessments to determine the potential for loss of critical knowledge caused by the loss of experienced workers; and enable nuclear organizations to utilize this knowledge to improve the skill and competence of new and existing workers In 2004, the IAEA published a report entitled The Nuclear Power Industry's Ageing Workforce: Transfer of Knowledge to the Next Generation (IAEA-TECDOC-1399). That report highlighted some of the knowledge management issues in Member States resulting from the large number of retiring nuclear power plant personnel who had been involved with the commissioning and initial operation of nuclear power plants. This publication complements that report by providing a practical methodology on knowledge loss risk management as one element of an overall strategic approach to workforce management which includes work force planning, recruitment, training, leadership development and knowledge retention

  3. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  4. 40 CFR 62.14580 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  5. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  6. Generalizable open source urban water portfolio simulation framework demonstrated using a multi-objective risk-based planning benchmark problem.

    Science.gov (United States)

    Trindade, B. C.; Reed, P. M.

    2017-12-01

    The growing access and reduced cost for computing power in recent years has promoted rapid development and application of multi-objective water supply portfolio planning. As this trend continues there is a pressing need for flexible risk-based simulation frameworks and improved algorithm benchmarking for emerging classes of water supply planning and management problems. This work contributes the Water Utilities Management and Planning (WUMP) model: a generalizable and open source simulation framework designed to capture how water utilities can minimize operational and financial risks by regionally coordinating planning and management choices, i.e. making more efficient and coordinated use of restrictions, water transfers and financial hedging combined with possible construction of new infrastructure. We introduce the WUMP simulation framework as part of a new multi-objective benchmark problem for planning and management of regionally integrated water utility companies. In this problem, a group of fictitious water utilities seek to balance the use of the mentioned reliability driven actions (e.g., restrictions, water transfers and infrastructure pathways) and their inherent financial risks. Several traits of this problem make it ideal for a benchmark problem, namely the presence of (1) strong non-linearities and discontinuities in the Pareto front caused by the step-wise nature of the decision making formulation and by the abrupt addition of storage through infrastructure construction, (2) noise due to the stochastic nature of the streamflows and water demands, and (3) non-separability resulting from the cooperative formulation of the problem, in which decisions made by stakeholder may substantially impact others. Both the open source WUMP simulation framework and its demonstration in a challenging benchmarking example hold value for promoting broader advances in urban water supply portfolio planning for regions confronting change.

  7. Improving Operational Risk Management Using Business Performance Management Technologies

    OpenAIRE

    Bram Pieket Weeserik; Marco Spruit

    2018-01-01

    Operational Risk Management (ORM) comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM) technologies are believed to provide a solution for effective Operational Risk Management by offering several combined ...

  8. Risk Management Issues - An Aerospace Perspective

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  9. RISK MANAGEMENT IN CUSTOMS CONTROL

    Directory of Open Access Journals (Sweden)

    Elena Valerievna Drobot

    2017-06-01

    Full Text Available Customs administrations operating in the modern global economy are faced with a complex range of challenges. The prime responsibilities remain the collection of revenues and the protection of the society, but these demanding tasks must be performed effectively and efficiently, whilst at the same time facilitating the flow of legitimate goods. Risk management is a logical and systematic method of identifying, analyzing and managing risks. Risk management can be associated with any activity, function or process within the organization and will enable the organization to take advantage of opportunities and minimize potential losses. Minimization of the human factor in customs control through the implementation of non-intrusive inspection equipment can be very useful. The particularities of risk-management system (RMS implementation within customs control are discussed in the article. The authors single out the elements of the risk-management system, evaluate the effectiveness of risk-management in customs control. The main reasons for non-implementation of the risk-management system in customs control are described as well. The particular attention is paid to the benefits of customs risk management. The authors’ hypothesis is that risk management in customs control must find a balance between costs and benefits to address all risks equally. Criteria are needed to decide what constitutes an acceptable or unacceptable risk. Thus, system analysis and risk management system are the effective mechanisms for acceleration of customs clearance and improve the quality of customs control. As a conclusion, the authors give recommendations for the improvement of the effectiveness of risk management system in customs control.

  10. Perspectives of Forest Management Planning: Slovenian and Croatian Experience

    OpenAIRE

    Bončina, Andrej; Čavlović, Juro

    2009-01-01

    Drawing upon the historical framework of origin and development, and a long tradition in forest management planning in Slovenia and Croatia, and based on a survey of literature and research to date, this paper addresses problems and perspectives of forest management planning. Comparison is made of forest management planning concepts, which generally differ from country to country in terms of natural, social and economic circumstances. Impacts of forest management planning on the condition and...

  11. Safety and resiliency in action: Integrating risk management into local development

    Directory of Open Access Journals (Sweden)

    Ebay Jorge S.

    2013-01-01

    Full Text Available This paper examines the efforts of the local government unit (LGU of San Jose de Buenavista, in the Province of Antique in central Philippines to manage risks associated with multiple hazards to protect the people, their livelihoods and local development gains. More specifically, it analyzes the process of pursuing risk management objectives vis-a-vis national and international disaster risk reduction and management (DRRM norms, without loosing sight of local contextual realities that directly influence people’s vulnerabilities and capacities. Risk management initiatives in the LGU revolve around four key areas namely disaster prevention and mitigation, disaster preparedness, emergency response, and recovery and rehabilitation. Binding these initiatives are actions that integrate governance mechanisms with scientific data and sectoral and community participation to develop a comprehensive plan of action and standard operating procedures that will serve as guideposts in the process of building a safer community. The experience of San Jose de Buenavista also suggests that cost saving strategies an be replicated by communities and organizations that have financial limitations to pursue DRRM objectives. This paper contends that risk management is a fundamental development strategy to pursue local development goals and to sustain efforts to protect development gains in the long run. This can be done using a combination of governance, risk assessment, knowledge management, vulnerability reduction and preparedness strategies. Local leadership, people’s participation, environmental resource management and continuous capability building are key elements of the process. Ultimately, risk management must be mainstreamed into local development to develop community resiliency.

  12. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  13. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the

  14. Risk Management for e-Business

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of a IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted software.

  15. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  16. A management plan for hospitals and medical centers facing radiation incidents.

    Science.gov (United States)

    Davari, Fereshteh; Zahed, Arash

    2015-09-01

    Nowadays, application of nuclear technology in different industries has largely expanded worldwide. Proportionately, the risk of nuclear incidents and the resulting injuries have, therefore, increased in recent years. Preparedness is an important part of the crisis management cycle; therefore efficient preplanning seems crucial to any crisis management plan. Equipped with facilities and experienced personnel, hospitals naturally engage with the response to disasters. The main purpose of our study was to present a practical management pattern for hospitals and medical centers in case they encounter a nuclear emergency. In this descriptive qualitative study, data were collected through experimental observations, sources like Safety manuals released by the International Atomic Energy Agency and interviews with experts to gather their ideas along with Delphi method for polling, and brainstorming. In addition, the 45 experts were interviewed on three targeted using brainstorming and Delphi method. We finally proposed a management plan along with a set of practicality standards for hospitals and medical centers to optimally respond to nuclear medical emergencies when a radiation incident happens nearby. With respect to the great importance of preparedness against nuclear incidents adoption and regular practice of nuclear crisis management codes for hospitals and medical centers seems quite necessary.

  17. Decisionmaking under risk in invasive species management: risk management theory and applications

    Science.gov (United States)

    Shefali V. Mehta; Robert G. Haight; Frances R. Homans

    2010-01-01

    Invasive species management is closely entwined with the assessment and management of risk that arises from the inherently random nature of the invasion process. The theory and application of risk management for invasive species with an economic perspective is reviewed in this synthesis. Invasive species management can be delineated into three general categories:...

  18. The Irma-sponge Program: Methodologies For Sustainable Flood Risk Management Along The Rhine and Meuse Rivers

    Science.gov (United States)

    Hooijer, A.; van Os, A. G.

    Recent flood events and socio-economic developments have increased the awareness of the need for improved flood risk management along the Rhine and Meuse Rivers. In response to this, the IRMA-SPONGE program incorporated 13 research projects in which over 30 organisations from all 6 River Basin Countries co-operated. The pro- gram is financed partly by the European INTERREG Rhine-Meuse Activities (IRMA). The main aim of IRMA-SPONGE is defined as: "The development of methodologies and tools to assess the impact of flood risk reduction measures and of land-use and climate change scenarios. This to support the spatial planning process in establish- ing alternative strategies for an optimal realisation of the hydraulic, economical and ecological functions of the Rhine and Meuse River Basins." Further important objec- tives are to promote transboundary co-operation in flood risk management by both scientific and management organisations, and to promote public participation in flood management issues. The projects in the program are grouped in three clusters, looking at measures from different scientific angles. The results of the projects in each cluster have been evaluated to define recommendations for flood risk management; some of these outcomes call for a change to current practices, e.g.: 1. (Flood Risk and Hydrol- ogy cluster): hydrological changes due to climate change exceed those due to further land use change, and are significant enough to necessitate a change in flood risk man- agement strategies if the currently claimed protection levels are to be sustained. 2. (Flood Protection and Ecology cluster): to not only provide flood protection but also enhance the ecological quality of rivers and floodplains, new flood risk management concepts ought to integrate ecological knowledge from start to finish, with a clear perspective on the type of nature desired and the spatial and time scales considered. 3. (Flood Risk Management and Spatial Planning cluster): extreme

  19. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  20. Planning and management for reactor decommissioning

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko

    2001-01-01

    This report describes decommissioning strategy, planning process, regulation, management and organization, radiological characterization and safety. Planning is used to identify, define and organize the requirements for decommissioning including decommissioning options, items to be accomplished (objective, scope), to solve problems of how it is to be accomplished (methods, means and procedures), questions of who will execute it (resources, organization and responsibilities, interfacing), and time when it will be executed (schedule for meeting the objectives). A plan is highly dependent on the quality of the management team assembled to carry it out. Radiological characterization involves a survey of existing data, calculation, in situ measurements and/or sampling and analyses. Using this databases decommissioning planner may assess options, considering: decontamination processes, dismantling procedures, tools required, radiological protection of workers and public/environment, waste classification, and resulting costs. Comparison and optimization of these factors will lead to selection of a decommissioning strategy, i.e. typically, immediate or deferred dismantling. The planning and implementation of decommissioning for nuclear reactors should be referred both recent dismantling techniques and many decommissioning experiences. The technical lessons learned from many projects will help in the planning for future decommissioning projects. And systematic planning and management are essential to successful completion of a decommissioning project. (author)

  1. Electric-power systems planning and greenhouse-gas emission management under uncertainty

    International Nuclear Information System (INIS)

    Li, Y.P.; Huang, G.H.

    2012-01-01

    Highlight: ►A multistage stochastic integer programming model is developed for planning electric-power systems. ►Uncertain and dynamic information can be incorporated within a multilayer scenario tree. ►This can help minimize system cost under random energy demand and greenhouse gas (GHG) abatement goal. ►Results can support decisions of facility expansion, electricity supply and GHG mitigation. - Abstract: In this study, a multistage interval-stochastic integer programming model is formulated for managing greenhouse gas (GHG) emissions and planning electric-power systems under uncertainty. The developed model can reflect dynamic, interactive, and uncertain characteristics of energy systems. Besides, the model can be used for answering questions related to types, times, demands and mitigations of energy systems planning practices, with the objective of minimizing system cost over a long-time planning horizon. The solutions can help generate electricity-generation schemes and capacity-expansion plans under different GHG-mitigation options and electricity-demand levels. Tradeoffs among system cost, energy security, and emission management can also be tackled. A high system cost will increase renewable energy supply and reduce GHG emission, while a desire for a low cost will run into risks of a high energy deficiency and a high GHG emission.

  2. Urban Land Use Classifcation Linked to Planning Management

    Institute of Scientific and Technical Information of China (English)

    QI Dongjin; ZHOU Jianyun; SHI Ke

    2012-01-01

    By analyzing the applicability of the new Code for Classification of Urban Land Use and Planning Standards of Development Land from the angle of planning management,this paper points out the conflicts between the planning and land use management institutions.Referring to the experience of land use control in the US and the UK through zoning and case law respectively,this paper puts forward that the urban land use classification should take into consideration the characteristics of the actual urban planning system and the possibility of mixed land use due to the uncertainty of urban development,and be linked to the institutions of planning and land supply management.

  3. Risk management frameworks for human health and environmental risks.

    Science.gov (United States)

    Jardine, Cindy; Hrudey, Steve; Shortreed, John; Craig, Lorraine; Krewski, Daniel; Furgal, Chris; McColl, Stephen

    2003-01-01

    A comprehensive analytical review of the risk assessment, risk management, and risk communication approaches currently being undertaken by key national, provincial/state, territorial, and international agencies was conducted. The information acquired for review was used to identify the differences, commonalities, strengths, and weaknesses among the various approaches, and to identify elements that should be included in an effective, current, and comprehensive approach applicable to environmental, human health and occupational health risks. More than 80 agencies, organizations, and advisory councils, encompassing more than 100 risk documents, were examined during the period from February 2000 until November 2002. An overview was made of the most important general frameworks for risk assessment, risk management, and risk communication for human health and ecological risk, and for occupational health risk. In addition, frameworks for specific applications were reviewed and summarized, including those for (1)contaminated sites; (2) northern contaminants; (3) priority substances; (4) standards development; (5) food safety; (6) medical devices; (7) prescription drug use; (8) emergency response; (9) transportation; (10) risk communication. Twelve frameworks were selected for more extensive review on the basis of representation of the areas of human health, ecological, and occupational health risk; relevance to Canadian risk management needs; representation of comprehensive and well-defined approaches; generalizability with their risk areas; representation of "state of the art" in Canada, the United States, and/or internationally; and extent of usage of potential usage within Canada. These 12 frameworks were: 1. Framework for Environmental Health Risk Management (US Presidential/Congressional Commission on Risk Assessment and Risk Management, 1997). 2. Health Risk Determination: The Challenge of Health Protection (Health and Welfare Canada, 1990). 3. Health Canada Decision

  4. Selected Aspects Of The Risk In The Supply Chain In Context Of The Supplier Quality Management

    Science.gov (United States)

    Koblen, Ivan; Lestyánszka Škůrková, Katarína

    2015-06-01

    The introductory part of the paper underlines the importance of "Risk-based thinking" in the Quality Management System (QMS) and risk in the supply chain, as a principle part of the QMS. After introducing the key terms, the authors focused on the principle part of the article - explanation of the external and internal supply chain risks and the main factors concerning the supply risks, demand risks and environmental risks (as cardinal types of external supply chain risks) as well as the manufacturing and process risks, network/planning and control risks (as most important types of internal supply chain risks). The authors inform on the selected supply chain risk management tools, especially on those which are linked to the appropriate utilization of quality management tools.

  5. Selected Aspects Of The Risk In The Supply Chain In Context Of The Supplier Quality Management

    Directory of Open Access Journals (Sweden)

    Koblen Ivan

    2015-06-01

    Full Text Available The introductory part of the paper underlines the importance of "Risk-based thinking" in the Quality Management System (QMS and risk in the supply chain, as a principle part of the QMS. After introducing the key terms, the authors focused on the principle part of the article - explanation of the external and internal supply chain risks and the main factors concerning the supply risks, demand risks and environmental risks (as cardinal types of external supply chain risks as well as the manufacturing and process risks, network/planning and control risks (as most important types of internal supply chain risks. The authors inform on the selected supply chain risk management tools, especially on those which are linked to the appropriate utilization of quality management tools.

  6. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  7. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training

  8. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

  9. Mediterranean Storms: An Integrated Approach of Risk Management

    Science.gov (United States)

    Karageorgou, H.; Riza, E.; Linos, A.; Papanikolaou, D.

    2010-09-01

    response. The available and applied science and technology in prediction and early warning systems rely on the close collaboration between scientists and policy makers to achieve effective disaster prevention of human life and mitigation of damages. Developing agencies approach risk management as an integral part of development and encourage activities and measures to reduce the exposure and vulnerability to natural hazards through early warning systems, building codes, land use plans and disaster sensitive development plans. The human settlement and investment in high risk floodplains place greater numbers of people and economic assets in danger of being affected by storms and floods. Disasters and development are highly inter-related. Recurrent disasters and frequent localized disasters erode development and conversely the development processes can reduce disaster risk, or create new risks. The private sector participation in risk reduction efforts can help local communities mitigate disasters and increases the benefits of the businesses. The private insurance sector is highly involved in the prevention of disaster caused by natural hazards especially storms and floods. The collaboration between academic community and the insurance sector indicates the linkages between the mutual insurance actions and risk culture. Also tourism industry and private critical infrastructure sector get involved in prevention measures and activities against storm and flood risks to build sustainable functionality and keep public trust. NGOs focus on social, cultural, environmental, educational, or health issues in disaster management and their members are educated and experienced on their area of operations. The staff of local and national NGOs is familiar with culture, languages, governance structures, social networks, climate and geography of the affected area and holds a unique understanding of the specific problems of the affected population. Additionally, NGO’s operations do not

  10. 40 CFR 60.3010 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  11. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  12. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  13. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  14. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  15. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  16. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  17. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  18. Information Risk Management and Resilience

    Science.gov (United States)

    Dynes, Scott

    Are the levels of information risk management efforts within and between firms correlated with the resilience of the firms to information disruptions? This paper examines the question by considering the results of field studies of information risk management practices at organizations and in supply chains. The organizations investigated differ greatly in the degree of coupling from a general and information risk management standpoint, as well as in the levels of internal awareness and activity regarding information risk management. The comparison of the levels of information risk management in the firms and their actual or inferred resilience indicates that a formal information risk management approach is not necessary for resilience in certain sectors.

  19. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and

  20. Probability concepts in quality risk management.

    Science.gov (United States)

    Claycamp, H Gregg

    2012-01-01

    Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although risk is generally a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management tools are relatively silent on the meaning and uses of "probability." The probability concept is typically applied by risk managers as a combination of frequency-based calculation and a "degree of belief" meaning of probability. Probability as a concept that is crucial for understanding and managing risk is discussed through examples from the most general, scenario-defining and ranking tools that use probability implicitly to more specific probabilistic tools in risk management. A rich history of probability in risk management applied to other fields suggests that high-quality risk management decisions benefit from the implementation of more thoughtful probability concepts in both risk modeling and risk management. Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although "risk" generally describes a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management methodologies and respective tools focus on managing severity but are relatively silent on the in-depth meaning and uses of "probability." Pharmaceutical manufacturers are expanding their use of quality risk management to identify and manage risks to the patient that might occur in phases of the pharmaceutical life cycle from drug development to manufacture, marketing to product discontinuation. A probability concept is typically applied by risk managers as a combination of data-based measures of probability and a subjective "degree of belief" meaning of probability. Probability as

  1. Developing a national programme of flood risk management measures: Moldova

    Directory of Open Access Journals (Sweden)

    Ramsbottom David

    2016-01-01

    Full Text Available A Technical Assistance project funded by the European Investment Bank has been undertaken to develop a programme of flood risk management measures for Moldova that will address the main shortcomings in the present flood management system, and provide the basis for long-term improvement. Areas of significant flood risk were identified using national hydraulic and flood risk modelling, and flood hazard and flood risk maps were then prepared for these high risk areas. The flood risk was calculated using 12 indicators representing social, economic and environmental impacts of flooding. Indicator values were combined to provide overall estimates of flood risk. Strategic approaches to flood risk management were identified for each river basin using a multi-criteria analysis. Measures were then identified to achieve the strategic approaches. A programme of measures covering a 20-year period was developed together with a more detailed Short-Term Investment Plan covering the first seven years of the programme. Arrangements are now being made to implement the programme. The technical achievements of the project included national hydrological and hydraulic modelling covering 12,000 km of river, the development of 2-dimensional channel and floodplain hydraulic models from a range of topographic and bathymetric data, and an integrated flood risk assessment that takes account of both economic and non-monetary impacts.

  2. Risk evaluation system for facility safeguards and security planning

    International Nuclear Information System (INIS)

    Udell, C.J.; Carlson, R.L.

    1987-01-01

    The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planning assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily

  3. IMPLEMENTING A RISK MANAGEMENT STANDARD

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2013-01-01

    Full Text Available After risk management “conquered” more and more project managers’ minds and showed its benefits for business and programs, the need to have a global risk management standard has become a crucial issue in the world of risk management. But having a global risk management standard has been a big challenge, starting from the decision of developing the standard (March-June 2005, to the moment of publishing it, November 2009. So, developing the ISO 31000:2009 standard has been more or less like a bumpy ride. Apparently, the people involved in developing the global risk management standard understood from the very beginning that no challenges are too big, nor any tasks too small and that the task of having a new, comprehensive global risk management standard should be completed with excellence: defining the principles and the framework guiding the risk management process applicable for all type of organizations and for a wide range of activities. Coming up with a global standard should always be based on the real organizations’ needs and should fulfill real risk management requirements. The article is trying to present the pros and cons of risk management standard implementation, challenging the implementation process itself and the added value of implementing the standard due to the lack of implementation enablers, like risk culture, a real problem especially in an international environment.

  4. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    MICHAEL HORSFALL

    ABSTRACT: The provision of environment management plan and ... environmental management plan of the eastern coasts of Mazandaran Province. ..... REFERENCE ... Department of oceanography, texas A&M university. An online textbook.

  5. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  6. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  7. A risk-based monitoring framework for the long term management of used fuel

    International Nuclear Information System (INIS)

    Garisto, N.C.

    2006-01-01

    The Nuclear Waste Management Organization has a mandate from the Government of Canada to consult with the public and to recommend an approach for managing Canada's used nuclear fuel. Three main fuel management methods are being explored and evaluated by the Nuclear Waste Management Organization: disposal in a Deep Geological Repository (DGR); reactor-site extended storage (RES); and centralized extended storage (CES), either above ground or below ground. The used nuclear fuel management system, whether a DGR or an extended storage system will require monitoring. In this study, a risk-based monitoring framework was developed for the used fuel management program. The proposed approach addresses the unique challenges of used fuel management being implemented in a multi-stakeholder process, including: (i) the complexity of the facilities; (ii) the need to consider both science-based risk and perceived risk in the monitoring plans; and (iii) the difficulty in conducting 'invasive' measurements of sealed systems, particularly over a very long time frame. (author)

  8. Bank liquidity risk management: A South African survey to determine future change

    Directory of Open Access Journals (Sweden)

    S. Claassen

    2012-09-01

    Full Text Available In 2008 the global financial system and, more particularly, the world banking system suffered a financial crisis worse than any earlier crises. The financial crunch brought to light that liquidity risk management in banks poses a problem, and that the world’s financial institutions will have to change their current practices as it relates to this risk. Apart from the importance of liquidity and the risk that it may cause, the integrated nature of all risks made banks more aware of the fact that none of these risks can be managed in isolation. For various reasons, South African banks were not as exposed to the problems experienced in the global context. However, SA banks may have learned new lessons from the crisis and may plan to change the way they manage liquidity risk in particular, in the future. In order to determine how SA banks perceive liquidity management and liquidity risk, a survey of all SA banks was carried out. The majority of respondents indicated that the financial crisis reminded them of the importance of liquidity risk management in the South African banking system as well as the global banking system. The majority of banks rate all the liquidity risk management tools as extremely important and rate corporate governance, strategy, policy and risk tolerance, liquidity risk measurement and intra-day liquidity as their number one priority. Basel III is generally perceived as being effective, but 30% of respondents perceived it as neither effective nor ineffective, because South African banks already have similar measures in place

  9. Impact of climate change on management plans for lakes St. Francois and Aylmer in southern Quebec

    International Nuclear Information System (INIS)

    Fortin, L.G.; Turcotte, R.; Pugin, S.; Cyr, J.F.; Picard, F.

    2007-01-01

    The Centre d'Expertise Hydrique du Quebec (CEHQ) manages dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec. This paper addressed the issue of global warming and the impact on the hydrological regime within the next decades. The changes in the hydrological regime may pose a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ conducted a pilot study for the Saint-Francois and Aylmer reservoirs in order to formulate a method for evaluating the adaptability of currently used management plans to climate change. The project was based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps were used to evaluate the hydrological impacts of climate change. The newly developed model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios was evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. It was concluded that climate change will influence the trade-off between different management objectives of the reservoirs. Although adaptation measures may be feasible, it was determined that there is no unique solution to all climate change scenarios. 27 refs., 7 tabs., 12 figs

  10. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  11. CEA - 2014 risk management assessment

    International Nuclear Information System (INIS)

    Bonnevie, Edwige; Verwaerde, Daniel; Maillot, Bernard

    2015-06-01

    After introducing presentations of CEA managers in charge of risk management and controls, this document presents and comments the actions undertaken by the CEA and the obtained results in terms of risk management in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transport of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal audits and controls. Other topics are addressed like the presentation of the risk management department, and the role of the CEA in the relationship between research and industry

  12. Risks and opportunities management on laser Megajoule project: the development of a new knowledge

    International Nuclear Information System (INIS)

    Delafosse-Le Ber, H.; Deysson, St.; Briault, S.

    2004-01-01

    and O on the project in a quantitative way. These effects could have a technique, a contractual, a legal, a lawful, a political, a social or an organisational aspect. The 'Risks and Opportunities Team' carries out the management of the portfolio of the project risks and opportunities according the DGA AQ 924 reference, helps each operational level of responsibility to refine its analyses and to prepare its reporting near the Project Manager. The R and O process is integrated into the costs, the deadlines and the performance management. It allows the leading of the System Engineering, feeds and exploits the experience feedback, works in interface with the Integrated Logistical Support / Reliability Availability Maintainability (ILS/ RAM) team, with the safety, with the quality and with the management configuration aspects. A data-processing tool (which is a multi-user accesses and interfaces exploitation database) assists this methodology. This tool is, firstly connected, to the OPX2 planning software for the action planning and the simulation of deadline impacts; and secondly to the database of annual financial estimation and cost management with project termination in order to establish the risk and opportunities margins. More than the risks and opportunities portfolio traceability aims, this tool allows: Monte-Carlo simulations in order to evaluate financial or calendar margins (exposure curves which combined risks and opportunities); edition of indicators file-index with file (for example, safety risk table; evolution of the global safety risk in time; comparison between the before action additional cost and the a priori after additional cost action cumulated to the cost of the action plan itself; concept of return on investment); edition of dashboards of follow-up of portfolio; etc. (authors)

  13. An inexact mixed risk-aversion two-stage stochastic programming model for water resources management under uncertainty.

    Science.gov (United States)

    Li, W; Wang, B; Xie, Y L; Huang, G H; Liu, L

    2015-02-01

    Uncertainties exist in the water resources system, while traditional two-stage stochastic programming is risk-neutral and compares the random variables (e.g., total benefit) to identify the best decisions. To deal with the risk issues, a risk-aversion inexact two-stage stochastic programming model is developed for water resources management under uncertainty. The model was a hybrid methodology of interval-parameter programming, conditional value-at-risk measure, and a general two-stage stochastic programming framework. The method extends on the traditional two-stage stochastic programming method by enabling uncertainties presented as probability density functions and discrete intervals to be effectively incorporated within the optimization framework. It could not only provide information on the benefits of the allocation plan to the decision makers but also measure the extreme expected loss on the second-stage penalty cost. The developed model was applied to a hypothetical case of water resources management. Results showed that that could help managers generate feasible and balanced risk-aversion allocation plans, and analyze the trade-offs between system stability and economy.

  14. Extinction risk assessment for the species survival plan (SSP) population of the Bali mynah (Leucopsar rothschildi).

    Science.gov (United States)

    Earnhardt, Joanne M; Thompson, Steven D; Faust, Lisa J

    2009-05-01

    The Bali mynah Species Survival Plan (SSP), an Association of Zoos and Aquariums program, strives to maintain the genetic and demographic health of its population, avoid unplanned changes in size, and minimize the risk of population extinction. The SSP population meets current demographic and genetic objectives with a population size of 209 birds at 61 institutions and 96% genetic diversity (GD) retained from the source population. However, participating institutions have expressed concerns regarding space allocation, target population size (TPS), breeding restrictions, inbreeding depression, and harvest in relation to future population availability and viability. Based on these factors, we assess five questions with a quantitative risk assessment, specifically a population viability analysis (PVA) using ZooRisk software. Using an individual-based stochastic model, we project potential population changes under different conditions (e.g. changes in TPS and genetic management) to identify the most effective management actions. Our projections indicate that under current management conditions, population decline and extinction are unlikely and that although GD will decline over 100 years the projected loss does not exceed levels acceptable to population managers (less than 90% GD retained). Model simulations indicate that the combination of two genetic management strategies (i.e. priority breeding based on mean kinship and inbreeding avoidance) benefits the retention of GD and reduces the accumulation of inbreeding. The current TPS (250) is greater than necessary to minimize the risk of extinction for the SSP population but any reduction in TPS must be accompanied by continued application of genetic management. If carefully planned, birds can be harvested for transfer to Bali for a reintroduction program without jeopardizing the SSP population.

  15. Understanding safety and production risks in rail engineering planning and protection.

    Science.gov (United States)

    Wilson, John R; Ryan, Brendan; Schock, Alex; Ferreira, Pedro; Smith, Stuart; Pitsopoulos, Julia

    2009-07-01

    Much of the published human factors work on risk is to do with safety and within this is concerned with prediction and analysis of human error and with human reliability assessment. Less has been published on human factors contributions to understanding and managing project, business, engineering and other forms of risk and still less jointly assessing risk to do with broad issues of 'safety' and broad issues of 'production' or 'performance'. This paper contains a general commentary on human factors and assessment of risk of various kinds, in the context of the aims of ergonomics and concerns about being too risk averse. The paper then describes a specific project, in rail engineering, where the notion of a human factors case has been employed to analyse engineering functions and related human factors issues. A human factors issues register for potential system disturbances has been developed, prior to a human factors risk assessment, which jointly covers safety and production (engineering delivery) concerns. The paper concludes with a commentary on the potential relevance of a resilience engineering perspective to understanding rail engineering systems risk. Design, planning and management of complex systems will increasingly have to address the issue of making trade-offs between safety and production, and ergonomics should be central to this. The paper addresses the relevant issues and does so in an under-published domain - rail systems engineering work.

  16. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  17. Building on Two Decades of Ecosystem Management and Biodiversity Conservation under the Northwest Forest Plan, USA

    Directory of Open Access Journals (Sweden)

    Dominick A. DellaSala

    2015-09-01

    Full Text Available The 1994 Northwest Forest Plan (NWFP shifted federal lands management from a focus on timber production to ecosystem management and biodiversity conservation. The plan established a network of conservation reserves and an ecosystem management strategy on ~10 million hectares from northern California to Washington State, USA, within the range of the federally threatened northern spotted owl (Strix occidentalis caurina. Several subsequent assessments—and 20 years of data from monitoring programs established under the plan—have demonstrated the effectiveness of this reserve network and ecosystem management approach in making progress toward attaining many of the plan’s conservation and ecosystem management goals. This paper (1 showcases the fundamental conservation biology and ecosystem management principles underpinning the NWFP as a case study for managers interested in large-landscape conservation; and (2 recommends improvements to the plan’s strategy in response to unprecedented climate change and land-use threats. Twenty years into plan implementation, however, the U.S. Forest Service and Bureau of Land Management, under pressure for increased timber harvest, are retreating from conservation measures. We believe that federal agencies should instead build on the NWFP to ensure continuing success in the Pacific Northwest. We urge federal land managers to (1 protect all remaining late-successional/old-growth forests; (2 identify climate refugia for at-risk species; (3 maintain or increase stream buffers and landscape connectivity; (4 decommission and repair failing roads to improve water quality; (5 reduce fire risk in fire-prone tree plantations; and (6 prevent logging after fires in areas of high conservation value. In many respects, the NWFP is instructive for managers considering similar large-scale conservation efforts.

  18. A PUBLIC PLATFORM FOR GEOSPATIAL DATA SHARING FOR DISASTER RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    S. Balbo

    2014-01-01

    This paper presents a case study scenario of setting up a Web platform based on GeoNode. It is a public platform called MASDAP and promoted by the Government of Malawi in order to support development of the country and build resilience against natural disasters. A substantial amount of geospatial data has already been collected about hydrogeological risk, as well as several other-disasters related information. Moreover this platform will help to ensure that the data created by a number of past or ongoing projects is maintained and that this information remains accessible and useful. An Integrated Flood Risk Management Plan for a river basin has already been included in the platform and other data from future disaster risk management projects will be added as well.

  19. Integrated environmental risk assessment and whole-process management system in chemical industry parks.

    Science.gov (United States)

    Shao, Chaofeng; Yang, Juan; Tian, Xiaogang; Ju, Meiting; Huang, Lei

    2013-04-19

    Chemical industry parks in China are considered high-risk areas because they present numerous risks that can damage the environment, such as pollution incidents. In order to identify the environmental risks and the principal risk factors in these areas, we have developed a simple physical model of a regional environmental risk field (ERF) using existing dispersal patterns and migration models. The regional ERF zoning was also conducted and a reference value for diagnostic methods was developed to determine risk-acceptable, risk-warning, and risk-mitigation zones, which can provide a risk source layout for chemical industry parks. In accordance with the environmental risk control requirements, this study focused on the three stages of control and management of environmental risk and established an environmental risk management system including risk source identification and assessment, environmental safety planning, early risk warning, emergency management, assessment of environmental effects, and environmental remediation of pollution accidents. By using this model, the environmental risks in Tianjin Binhai New Area, the largest chemical industry park in China, were assessed and the environmental risk zoning map was drawn, which suggested the existence of many unacceptable environmental risks in this area. Thus, relevant suggestions have been proposed from the perspective of the adjustment of risk source layout, intensified management of environmental risk control and so on.

  20. Integrated Environmental Risk Assessment and Whole-Process Management System in Chemical Industry Parks

    Science.gov (United States)

    Shao, Chaofeng; Yang, Juan; Tian, Xiaogang; Ju, Meiting; Huang, Lei

    2013-01-01

    Chemical industry parks in China are considered high-risk areas because they present numerous risks that can damage the environment, such as pollution incidents. In order to identify the environmental risks and the principal risk factors in these areas, we have developed a simple physical model of a regional environmental risk field (ERF) using existing dispersal patterns and migration models. The regional ERF zoning was also conducted and a reference value for diagnostic methods was developed to determine risk-acceptable, risk-warning, and risk-mitigation zones, which can provide a risk source layout for chemical industry parks. In accordance with the environmental risk control requirements, this study focused on the three stages of control and management of environmental risk and established an environmental risk management system including risk source identification and assessment, environmental safety planning, early risk warning, emergency management, assessment of environmental effects, and environmental remediation of pollution accidents. By using this model, the environmental risks in Tianjin Binhai New Area, the largest chemical industry park in China, were assessed and the environmental risk zoning map was drawn, which suggested the existence of many unacceptable environmental risks in this area. Thus, relevant suggestions have been proposed from the perspective of the adjustment of risk source layout, intensified management of environmental risk control and so on. PMID:23603866

  1. Integrated Environmental Risk Assessment and Whole-Process Management System in Chemical Industry Parks

    Directory of Open Access Journals (Sweden)

    Lei Huang

    2013-04-01

    Full Text Available Chemical industry parks in China are considered high-risk areas because they present numerous risks that can damage the environment, such as pollution incidents. In order to identify the environmental risks and the principal risk factors in these areas, we have developed a simple physical model of a regional environmental risk field (ERF using existing dispersal patterns and migration models. The regional ERF zoning was also conducted and a reference value for diagnostic methods was developed to determine risk-acceptable, risk-warning, and risk-mitigation zones, which can provide a risk source layout for chemical industry parks. In accordance with the environmental risk control requirements, this study focused on the three stages of control and management of environmental risk and established an environmental risk management system including risk source identification and assessment, environmental safety planning, early risk warning, emergency management, assessment of environmental effects, and environmental remediation of pollution accidents. By using this model, the environmental risks in Tianjin Binhai New Area, the largest chemical industry park in China, were assessed and the environmental risk zoning map was drawn, which suggested the existence of many unacceptable environmental risks in this area. Thus, relevant suggestions have been proposed from the perspective of the adjustment of risk source layout, intensified management of environmental risk control and so on.

  2. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  3. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) [Reserved] (6) Policy—planning—management—capacity...

  4. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  5. Information System for Land-Use Planning and Management

    Institute of Scientific and Technical Information of China (English)

    YU Xiao; MIAO Fang

    2008-01-01

    In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM+ and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.

  6. ENTERPRISE OPERATION PLANNING IN THE CONDITIONS OF RISK AND UNCERTAINTY IN THE EXTERNAL AND INTERNAL ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Titov V. V.

    2017-09-01

    Full Text Available Optimization of the enterprise activity planning taking into account the risk and uncertainty of the external and internal environment is a complex scientific and methodological problem. Its solution is important for the planning practice. Therefore, the relevance of this research topic is beyond doubt. Planning is based on the use of a multilevel system of models. At the top level, the achievement of key strategic indicators is ensured by the development and implementation of innovations, mainly related to the planning of the release of new high-tech products. However, it is at this level that the risks and uncertainties have the greatest impact on the planning processes for the development, production and marketing of new products. In the scientific literature it is proposed to use the stochastic graphs with returns for this purpose. This idea is also supported in this work. However, the implementation of such an idea requires additional methodological developments and quantitative calculations. The coordination of strategic decisions with tactical plans is based on the idea of eliminating the economic and other risks associated with the economic activity of the enterprise in tactical planning, by creating the stochastic reserves based on the implementation of additional innovations that ensure the receipt of above-target sales volumes, profits and other indicators of the strategic plan. The organization of operational management of production is represented by an iterative, sliding process (reducing risks in production, which is realized taking into account the limitations of tactical control.

  7. An evaluation of a risk-based environmental regulation in Brazil: Limitations to risk management of hazardous installations

    International Nuclear Information System (INIS)

    Naime, Andre

    2017-01-01

    The environmental regulation of hazardous projects with risk-based decision-making processes can lead to a deficient management of human exposure to technological hazards. Such an approach for regulation is criticized for simplifying the complexity of decisions involving the economic, social, and environmental aspects of the installation and operation of hazardous facilities in urban areas. Results of a Brazilian case study indicate that oil and gas transmission pipelines may represent a threat to diverse communities if the relationship between such linear projects and human populations is overlooked by regulatory bodies. Results also corroborate known challenges to the implementation of EIA processes and outline limitations to an effective environmental and risk management. Two preliminary topics are discussed to strengthen similar regulatory practices. Firstly, an effective integration between social impact assessment and risk assessment in EIA processes to have a more comprehensive understanding of the social fabric. Secondly, the advancement of traditional management practices for hazardous installations to pursue a strong transition from assessment and evaluation to management and control and to promote an effective interaction between land-use planning and environmental regulation.

  8. An evaluation of a risk-based environmental regulation in Brazil: Limitations to risk management of hazardous installations

    Energy Technology Data Exchange (ETDEWEB)

    Naime, Andre, E-mail: andre.naime.ibama@gmail.com

    2017-03-15

    The environmental regulation of hazardous projects with risk-based decision-making processes can lead to a deficient management of human exposure to technological hazards. Such an approach for regulation is criticized for simplifying the complexity of decisions involving the economic, social, and environmental aspects of the installation and operation of hazardous facilities in urban areas. Results of a Brazilian case study indicate that oil and gas transmission pipelines may represent a threat to diverse communities if the relationship between such linear projects and human populations is overlooked by regulatory bodies. Results also corroborate known challenges to the implementation of EIA processes and outline limitations to an effective environmental and risk management. Two preliminary topics are discussed to strengthen similar regulatory practices. Firstly, an effective integration between social impact assessment and risk assessment in EIA processes to have a more comprehensive understanding of the social fabric. Secondly, the advancement of traditional management practices for hazardous installations to pursue a strong transition from assessment and evaluation to management and control and to promote an effective interaction between land-use planning and environmental regulation.

  9. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  10. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  11. Contributions for territorial management of risks associated with oil activity

    Directory of Open Access Journals (Sweden)

    Felipe Pinto Gonçalves

    2013-06-01

    Full Text Available Whereas that the growing complexity of technical and spatial organization of the oil activity in Espírito Santo state gives new demands for land use management to the local governments, this article addresses the issue of economic and technological risks associated with such activities. Based on the evaluation of legal instruments such as the classification of land uses and the zoning, are discussed the possibilities of insertion the risks in municipal policies for land use planning

  12. Supply chain risk management

    OpenAIRE

    Christian Hollstein; Frank Himpel

    2013-01-01

    Background: Supply chain risk management increasingly gains prominence in many international industries. In order to strengthen supply chain structures, processes, and networks, adequate potentials for risk management need to be built (focus on effective logistics) and to be utilized (focus on efficient logistics). Natural-based disasters, such as the case of Fukushima, illustrate how crucial risk management is. Method: By aligning a theoretical-conceptual framework with empirical-induct...

  13. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  14. Risk assessment and risk management at the Canadian Food Inspection Agency (CFIA): a perspective on the monitoring of foods for chemical residues.

    Science.gov (United States)

    Bietlot, Henri P; Kolakowski, Beata

    2012-08-01

    The Canadian Food Inspection Agency (CFIA) uses 'Ranked Risk Assessment' (RRA) to prioritize chemical hazards for inclusion in monitoring programmes or method development projects based on their relative risk. The relative risk is calculated for a chemical by scoring toxicity and exposure in the 'risk model scoring system' of the Risk Priority Compound List (RPCL). The relative ranking and the risk management options are maintained and updated in the RPCL. The ranking may be refined by the data generated by the sampling and testing programs. The two principal sampling and testing programmes are the National Chemical Residue Monitoring Program (NCRMP) and the Food Safety Action Plan (FSAP). The NCRMP sampling plans focus on the analysis of federally registered products (dairy, eggs, honey, meat and poultry, fresh and processed fruit and vegetable commodities, and maple syrup) for residues of veterinary drugs, pesticides, environmental contaminants, mycotoxins, and metals. The NCRMP is complemented by the Food Safety Action Plan (FSAP) targeted surveys. These surveys focus on emerging chemical hazards associated with specific foods or geographical regions for which applicable maximum residue limits (MRLs) are not set. The data from the NCRMP and FSAP also influence the risk management (follow-up) options. Follow-up actions vary according to the magnitude of the health risk, all with the objective of preventing any repeat occurrence to minimize consumer exposure to a product representing a potential risk to human health. © Her Majesty the Queen in Right of Canada 2012. Drug Testing and Analysis © 2012 John Wiley & Sons, Ltd.

  15. The United Kingdom's School Asset Management Plans.

    Science.gov (United States)

    Jones, Alan

    1999-01-01

    Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…

  16. Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

    Science.gov (United States)

    Equils, Douglas J.

    2008-01-01

    Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of

  17. A management plan for hospitals and medical centers facing radiation incidents

    Directory of Open Access Journals (Sweden)

    Fereshteh Davari

    2015-01-01

    Full Text Available Background: Nowadays, application of nuclear technology in different industries has largely expanded worldwide. Proportionately, the risk of nuclear incidents and the resulting injuries have, therefore, increased in recent years. Preparedness is an important part of the crisis management cycle; therefore efficient preplanning seems crucial to any crisis management plan. Equipped with facilities and experienced personnel, hospitals naturally engage with the response to disasters. The main purpose of our study was to present a practical management pattern for hospitals and medical centers in case they encounter a nuclear emergency. Materials and Methods: In this descriptive qualitative study, data were collected through experimental observations, sources like Safety manuals released by the International Atomic Energy Agency and interviews with experts to gather their ideas along with Delphi method for polling, and brainstorming. In addition, the 45 experts were interviewed on three targeted using brainstorming and Delphi method. Results: We finally proposed a management plan along with a set of practicality standards for hospitals and medical centers to optimally respond to nuclear medical emergencies when a radiation incident happens nearby. Conclusion: With respect to the great importance of preparedness against nuclear incidents adoption and regular practice of nuclear crisis management codes for hospitals and medical centers seems quite necessary.

  18. A ten-step process to develop case management plans.

    Science.gov (United States)

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  19. Risk-based investment trade-off related to building facility management

    Energy Technology Data Exchange (ETDEWEB)

    Taillandier, F. [Departement TIDS, Centre Scientifique et Technique du Batiment, 06904 Sophia Antipolis (France); Laboratoire Optimisation de la conception et Ingenierie de l' environnement, Polytech' Savoie, Universite de Savoie, 73376 Le Bourget du lac (France)], E-mail: franck.taillandier@univ-savoie.fr; Sauce, G. [Laboratoire Optimisation de la conception et Ingenierie de l' environnement, Polytech' Savoie, Universite de Savoie, 73376 Le Bourget du lac (France); Bonetto, R. [Departement TIDS, Centre Scientifique et Technique du Batiment, 06904 Sophia Antipolis (France)

    2009-04-15

    Due to his or her profession, any building facility manager has to face many decision-making situations. One of the most important to be mentioned is the arbitration of a multi-year maintenance plan for buildings. Deciding between proposed maintenance actions, according to several constraints, so as to aim at satisfying corporate strategy is a complex choice. Risk approaches can be particularly effective because of their ability to handle complexity and uncertainties. The problem is then to be able to propose a method considering risks, adapted to the specific context of building facility management. Our method, regarded as a traditional approach, includes needed resources (i.e. costs) according to constraints (i.e. budget), but it also considers several risk domains (safety, technical preservation, client satisfaction, etc.), through the consequences (gain and loss). It proposes an ergonomic arbitration system based on filters following two complementary approaches: a selection of the fundamental actions and then an optimization of the plan (in a global view). The aim, for decision-makers, is to build their own solution by testing multiple angles of vision in simulation logic. This article presents the principles of the method, illustrated by an example of a real case conducted for a leading French company.

  20. Risk-based investment trade-off related to building facility management

    International Nuclear Information System (INIS)

    Taillandier, F.; Sauce, G.; Bonetto, R.

    2009-01-01

    Due to his or her profession, any building facility manager has to face many decision-making situations. One of the most important to be mentioned is the arbitration of a multi-year maintenance plan for buildings. Deciding between proposed maintenance actions, according to several constraints, so as to aim at satisfying corporate strategy is a complex choice. Risk approaches can be particularly effective because of their ability to handle complexity and uncertainties. The problem is then to be able to propose a method considering risks, adapted to the specific context of building facility management. Our method, regarded as a traditional approach, includes needed resources (i.e. costs) according to constraints (i.e. budget), but it also considers several risk domains (safety, technical preservation, client satisfaction, etc.), through the consequences (gain and loss). It proposes an ergonomic arbitration system based on filters following two complementary approaches: a selection of the fundamental actions and then an optimization of the plan (in a global view). The aim, for decision-makers, is to build their own solution by testing multiple angles of vision in simulation logic. This article presents the principles of the method, illustrated by an example of a real case conducted for a leading French company