  1. HOW INTERNAL RISK - BASED AUDIT APPRAISES THE EVALUATION OF RISKS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    N. Dorosh

    2017-09-01

    Full Text Available The article deals with the nature and function of the internal risk-based audit process approach to create patterns of risks and methods of evaluation. Deals with the relationship between the level of maturity of the risk of the company and the method of risk-based internal audit. it was emphasized that internal auditing provides an independent and objective opinion to an organization’s management as to whether its risks are being managed to acceptable levels.

  2. Risk-based decision making and risk management of European Union regional programs

    Directory of Open Access Journals (Sweden)

    Michalopoulos Evangelos

    2008-01-01

    Full Text Available This paper presents a generalized method for management decision making incorporating risk assessment techniques. The risk based decision making methodology is applied to European Union expenditure programs used to implement its regional policy, such as the community support framework, community initiatives, special initiatives and other European policies. An example is presented for the development of an audit (inspection program in the region of West Macedonia, Greece, during the implementation of the 3rd Community Structural Support Framework Operational Program. The generic nature of the method permits its use in the management of similar European regional programs in Greece and other European countries. It is also applicable to many other industries interested in applying risk-based management decisions to physical or process based systems. .

  3. Big data based fraud risk management at Alibaba

    OpenAIRE

    Chen, Jidong; Tao, Ye; Wang, Haoran; Chen, Tao

    2015-01-01

    With development of mobile internet and finance, fraud risk comes in all shapes and sizes. This paper is to introduce the Fraud Risk Management at Alibaba under big data. Alibaba has built a fraud risk monitoring and management system based on real-time big data processing and intelligent risk models. It captures fraud signals directly from huge amount data of user behaviors and network, analyzes them in real-time using machine learning, and accurately predicts the bad users and transactions....

  4. The Research on Safety Management Information System of Railway Passenger Based on Risk Management Theory

    Science.gov (United States)

    Zhu, Wenmin; Jia, Yuanhua

    2018-01-01

    Based on the risk management theory and the PDCA cycle model, requirements of the railway passenger transport safety production is analyzed, and the establishment of the security risk assessment team is proposed to manage risk by FTA with Delphi from both qualitative and quantitative aspects. The safety production committee is also established to accomplish performance appraisal, which is for further ensuring the correctness of risk management results, optimizing the safety management business processes and improving risk management capabilities. The basic framework and risk information database of risk management information system of railway passenger transport safety are designed by Ajax, Web Services and SQL technologies. The system realizes functions about risk management, performance appraisal and data management, and provides an efficient and convenient information management platform for railway passenger safety manager.

  5. Pedestrian safety management using the risk-based approach

    Directory of Open Access Journals (Sweden)

    Romanowska Aleksandra

    2017-01-01

    Full Text Available The paper presents a concept of a multi-level pedestrian safety management system. Three management levels are distinguished: strategic, tactical and operational. The basis for the proposed approach to pedestrian safety management is a risk-based method. In the approach the elements of behavioural and systemic theories were used, allowing for the development of a formalised and repeatable procedure integrating the phases of risk assessment and response to the hazards of road crashes involving pedestrians. Key to the method are tools supporting pedestrian safety management. According to the risk management approach, the tools can be divided into two groups: tools supporting risk assessment and tools supporting risk response. In the paper attention is paid to selected tools supporting risk assessment, with particular emphasis on the methods for estimating forecasted pedestrian safety measures (at strategic, national and regional level and identification of particularly dangerous locations in terms of pedestrian safety at tactical (regional and local and operational level. The proposed pedestrian safety management methods and tools can support road administration in making rational decisions in terms of road safety, safety of road infrastructure, crash elimination measures or reducing the consequences suffered by road users (particularly pedestrians as a result of road crashes.

  6. Trust-Based Information Risk Management in a Supply Chain Network

    OpenAIRE

    Yanjun Zuo; Wen-Chen Hu

    2009-01-01

    Information risk management is crucial for an organization operating in an increasingly integrated and intensively communicated environment to mitigate risks and ensure core business functions. Given the open and dynamic nature of a supply chain network, information risk management is challenging and various factors must be considered. This article introduces a trust-based approach to facilitate supply chain participants to perform effective risk management. The major components of the propos...

  7. Big data based fraud risk management at Alibaba

    Directory of Open Access Journals (Sweden)

    Jidong Chen

    2015-12-01

    Full Text Available With development of mobile internet and finance, fraud risk comes in all shapes and sizes. This paper is to introduce the Fraud Risk Management at Alibaba under big data. Alibaba has built a fraud risk monitoring and management system based on real-time big data processing and intelligent risk models. It captures fraud signals directly from huge amount data of user behaviors and network, analyzes them in real-time using machine learning, and accurately predicts the bad users and transactions. To extend the fraud risk prevention ability to external customers, Alibaba also built up a big data based fraud prevention product called AntBuckler. AntBuckler aims to identify and prevent all flavors of malicious behaviors with flexibility and intelligence for online merchants and banks. By combining large amount data of Alibaba and customers', AntBuckler uses the RAIN score engine to quantify risk levels of users or transactions for fraud prevention. It also has a user-friendly visualization UI with risk scores, top reasons and fraud connections.

  8. A Risk-based Assessment And Management Framework For Multipollutant Air Quality

    OpenAIRE

    Frey, H. Christopher; Hubbell, Bryan

    2009-01-01

    The National Research Council recommended both a risk- and performance-based multipollutant approach to air quality management. Specifically, management decisions should be based on minimizing the exposure to, and risk of adverse effects from, multiple sources of air pollution and that the success of these decisions should be measured by how well they achieved this objective. We briefly describe risk analysis and its application within the current approach to air quality management. Recommend...

  9. Risk-based management of invading plant disease.

    Science.gov (United States)

    Hyatt-Twynam, Samuel R; Parnell, Stephen; Stutt, Richard O J H; Gottwald, Tim R; Gilligan, Christopher A; Cunniffe, Nik J

    2017-05-01

    Effective control of plant disease remains a key challenge. Eradication attempts often involve removal of host plants within a certain radius of detection, targeting asymptomatic infection. Here we develop and test potentially more effective, epidemiologically motivated, control strategies, using a mathematical model previously fitted to the spread of citrus canker in Florida. We test risk-based control, which preferentially removes hosts expected to cause a high number of infections in the remaining host population. Removals then depend on past patterns of pathogen spread and host removal, which might be nontransparent to affected stakeholders. This motivates a variable radius strategy, which approximates risk-based control via removal radii that vary by location, but which are fixed in advance of any epidemic. Risk-based control outperforms variable radius control, which in turn outperforms constant radius removal. This result is robust to changes in disease spread parameters and initial patterns of susceptible host plants. However, efficiency degrades if epidemiological parameters are incorrectly characterised. Risk-based control including additional epidemiology can be used to improve disease management, but it requires good prior knowledge for optimal performance. This focuses attention on gaining maximal information from past epidemics, on understanding model transferability between locations and on adaptive management strategies that change over time. © 2017 The Authors. New Phytologist © 2017 New Phytologist Trust.

  10. A model-based risk management framework

    Energy Technology Data Exchange (ETDEWEB)

    Gran, Bjoern Axel; Fredriksen, Rune

    2002-08-15

    The ongoing research activity addresses these issues through two co-operative activities. The first is the IST funded research project CORAS, where Institutt for energiteknikk takes part as responsible for the work package for Risk Analysis. The main objective of the CORAS project is to develop a framework to support risk assessment of security critical systems. The second, called the Halden Open Dependability Demonstrator (HODD), is established in cooperation between Oestfold University College, local companies and HRP. The objective of HODD is to provide an open-source test bed for testing, teaching and learning about risk analysis methods, risk analysis tools, and fault tolerance techniques. The Inverted Pendulum Control System (IPCON), which main task is to keep a pendulum balanced and controlled, is the first system that has been established. In order to make risk assessment one need to know what a system does, or is intended to do. Furthermore, the risk assessment requires correct descriptions of the system, its context and all relevant features. A basic assumption is that a precise model of this knowledge, based on formal or semi-formal descriptions, such as UML, will facilitate a systematic risk assessment. It is also necessary to have a framework to integrate the different risk assessment methods. The experiences so far support this hypothesis. This report presents CORAS and the CORAS model-based risk management framework, including a preliminary guideline for model-based risk assessment. The CORAS framework for model-based risk analysis offers a structured and systematic approach to identify and assess security issues of ICT systems. From the initial assessment of IPCON, we also believe that the framework is applicable in a safety context. Further work on IPCON, as well as the experiences from the CORAS trials, will provide insight and feedback for further improvements. (Author)

  11. Time-based collision risk modeling for air traffic management

    Science.gov (United States)

    Bell, Alan E.

    Since the emergence of commercial aviation in the early part of last century, economic forces have driven a steadily increasing demand for air transportation. Increasing density of aircraft operating in a finite volume of airspace is accompanied by a corresponding increase in the risk of collision, and in response to a growing number of incidents and accidents involving collisions between aircraft, governments worldwide have developed air traffic control systems and procedures to mitigate this risk. The objective of any collision risk management system is to project conflicts and provide operators with sufficient opportunity to recognize potential collisions and take necessary actions to avoid them. It is therefore the assertion of this research that the currency of collision risk management is time. Future Air Traffic Management Systems are being designed around the foundational principle of four dimensional trajectory based operations, a method that replaces legacy first-come, first-served sequencing priorities with time-based reservations throughout the airspace system. This research will demonstrate that if aircraft are to be sequenced in four dimensions, they must also be separated in four dimensions. In order to separate aircraft in four dimensions, time must emerge as the primary tool by which air traffic is managed. A functional relationship exists between the time-based performance of aircraft, the interval between aircraft scheduled to cross some three dimensional point in space, and the risk of collision. This research models that relationship and presents two key findings. First, a method is developed by which the ability of an aircraft to meet a required time of arrival may be expressed as a robust standard for both industry and operations. Second, a method by which airspace system capacity may be increased while maintaining an acceptable level of collision risk is presented and demonstrated for the purpose of formulating recommendations for procedures

  12. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  13. A Risk-based Assessment And Management Framework For Multipollutant Air Quality

    Science.gov (United States)

    Frey, H. Christopher; Hubbell, Bryan

    2010-01-01

    The National Research Council recommended both a risk- and performance-based multipollutant approach to air quality management. Specifically, management decisions should be based on minimizing the exposure to, and risk of adverse effects from, multiple sources of air pollution and that the success of these decisions should be measured by how well they achieved this objective. We briefly describe risk analysis and its application within the current approach to air quality management. Recommendations are made as to how current practice could evolve to support a fully risk- and performance-based multipollutant air quality management system. The ability to implement a risk assessment framework in a credible and policy-relevant manner depends on the availability of component models and data which are scientifically sound and developed with an understanding of their application in integrated assessments. The same can be said about accountability assessments used to evaluate the outcomes of decisions made using such frameworks. The existing risk analysis framework, although typically applied to individual pollutants, is conceptually well suited for analyzing multipollutant management actions. Many elements of this framework, such as emissions and air quality modeling, already exist with multipollutant characteristics. However, the framework needs to be supported with information on exposure and concentration response relationships that result from multipollutant health studies. Because the causal chain that links management actions to emission reductions, air quality improvements, exposure reductions and health outcomes is parallel between prospective risk analyses and retrospective accountability assessments, both types of assessment should be placed within a single framework with common metrics and indicators where possible. Improvements in risk reductions can be obtained by adopting a multipollutant risk analysis framework within the current air quality management

  14. Risk-based management of remaining life of power plant components

    International Nuclear Information System (INIS)

    Roos, E.; Jovanovic, A.S.; Maile, K.; Auerkari, P.

    1999-01-01

    The paper describes application of different modules of the MPA-System ALIAS in risk-based management of remaining life of power plant components. The system allows comprehensive coverage of all aspects of the remaining life management, including also the risk analysis and risk management. In addition, thanks to the modular character of the system it is also possible to implement new methods: In the case described here, a new (probabilistic) method for determination of the next inspection time for the components exposed to creep loading has been developed and implemented in the system. Practical application of the method has shown (a) that the mean values obtained by the method fall into the range of results obtained by other methods (based on expert knowledge), and (b) that it is possible to quantify the probability of aberration from the mean values. This in turn allows quantifying the additional risks linked to e.g. prolonging of inspection intervals. (orig.) [de

  15. RISK MANAGEMENT AUTOMATION OF SOFTWARE PROJECTS BASED ОN FUZZY INFERENCE

    Directory of Open Access Journals (Sweden)

    T. M. Zubkova

    2015-09-01

    Full Text Available Application suitability for one of the intelligent methods for risk management of software projects has been shown based on the review of existing algorithms for fuzzy inference in the field of applied problems. Information sources in the management of software projects are analyzed; major and minor risks are highlighted. The most critical parameters have been singled out giving the possibility to estimate the occurrence of an adverse situations (project duration, the frequency of customer’s requirements changing, work deadlines, experience of developers’ participation in such projects and others.. The method of qualitative fuzzy description based on fuzzy logic has been developed for analysis of these parameters. Evaluation of possible situations and knowledge base formation rely on a survey of experts. The main limitations of existing automated systems have been identified in relation to their applicability to risk management in the software design. Theoretical research set the stage for software system that makes it possible to automate the risk management process for software projects. The developed software system automates the process of fuzzy inference in the following stages: rule base formation of the fuzzy inference systems, fuzzification of input variables, aggregation of sub-conditions, activation and accumulation of conclusions for fuzzy production rules, variables defuzzification. The result of risk management automation process in the software design is their quantitative and qualitative assessment and expert advice for their minimization. Practical significance of the work lies in the fact that implementation of the developed automated system gives the possibility for performance improvement of software projects.

  16. Managing wildfire events: risk-based decision making among a group of federal fire managers

    Science.gov (United States)

    Robyn S. Wilson; Patricia L. Winter; Lynn A. Maguire; Timothy. Ascher

    2011-01-01

    Managing wildfire events to achieve multiple management objectives involves a high degree of decision complexity and uncertainty, increasing the likelihood that decisions will be informed by experience-based heuristics triggered by available cues at the time of the decision. The research reported here tests the prevalence of three risk-based biases among 206...

  17. Develop risk-based procurement management tools for SMEs

    NARCIS (Netherlands)

    Staal, Anne; Hagelaar, Geoffrey; Walhof, Gert; Holman, Richard

    2016-01-01

    This paper provides guidance for developing risk-based management tools to improve the procurement (purchasing) performance of SMEs. Extant academic literature only offers little support on developing such tools and does not consider the wide variety of SMEs. The paper defines a procurement tool for

  18. Managing long-term polycyclic aromatic hydrocarbon contaminated soils: a risk-based approach.

    Science.gov (United States)

    Duan, Luchun; Naidu, Ravi; Thavamani, Palanisami; Meaklim, Jean; Megharaj, Mallavarapu

    2015-06-01

    Polycyclic aromatic hydrocarbons (PAHs) are a family of contaminants that consist of two or more aromatic rings fused together. Soils contaminated with PAHs pose significant risk to human and ecological health. Over the last 50 years, significant research has been directed towards the cleanup of PAH-contaminated soils to background level. However, this achieved only limited success especially with high molecular weight compounds. Notably, during the last 5-10 years, the approach to remediate PAH-contaminated soils has changed considerably. A risk-based prioritization of remediation interventions has become a valuable step in the management of contaminated sites. The hydrophobicity of PAHs underlines that their phase distribution in soil is strongly influenced by factors such as soil properties and ageing of PAHs within the soil. A risk-based approach recognizes that exposure and environmental effects of PAHs are not directly related to the commonly measured total chemical concentration. Thus, a bioavailability-based assessment using a combination of chemical analysis with toxicological assays and nonexhaustive extraction technique would serve as a valuable tool in risk-based approach for remediation of PAH-contaminated soils. In this paper, the fate and availability of PAHs in contaminated soils and their relevance to risk-based management of long-term contaminated soils are reviewed. This review may serve as guidance for the use of site-specific risk-based management methods.

  19. Governmental management of chemical risk

    International Nuclear Information System (INIS)

    Zimmerman, R.

    1990-01-01

    This book is organized under the following headings: risk management in the government context; legal and regulatory decrees and directives for managing chemical risk; incentive-based approaches for regulating risk; risk management in the federal system; and traditional approaches and new initiatives for managing chemical risk

  20. Strengthening air traffic safety management by moving from outcome-based towards risk-based evaluation of runway incursions

    International Nuclear Information System (INIS)

    Stroeve, Sybert H.; Som, Pradip; Doorn, Bas A. van; Bakker, G.J.

    2016-01-01

    Current safety management of aerodrome operations uses judgements of severity categories to evaluate runway incursions. Incident data show a small minority of severe incursions and a large majority of less severe incursions. We show that these severity judgements are mainly based upon the outcomes of runway incursions, in particular on the closest distances attained. As such, the severity-based evaluation leads to coincidental safety management feedback, wherein causes and risk implications of runway incursions are not well considered. In this paper we present a new framework for the evaluation of runway incursions, which effectively uses all runway incursions, which judges same types of causes similarly, and which structures causes and risk implications. The framework is based on risks of scenarios associated with the initiation of runway incursions. As a basis an inventory of scenarios is provided, which can represent almost all runway incursions involving a conflict with an aircraft. A main step in the framework is the assessment of the conditional probability of a collision given a runway incursion scenario. This can be effectively achieved for large sets of scenarios by agent-based dynamic risk modelling. The results provide detailed feedback on risks of runway incursion scenarios, thus enabling effective safety management. - Highlights: • Current evaluation of runway incursions is primarily based on their outcomes. • A new framework assesses collision risk given initiation of runway incursions. • Agent-based dynamic risk modelling can evaluate the risks of many scenarios. • A developed scenario inventory can represent almost all runway incursions. • The framework provides detailed feedback to safety management.

  1. An obesity/cardiometabolic risk reduction disease management program: a population-based approach.

    Science.gov (United States)

    Villagra, Victor G

    2009-04-01

    Obesity is a critical health concern that has captured the attention of public and private healthcare payers who are interested in controlling costs and mitigating the long-term economic consequences of the obesity epidemic. Population-based approaches to obesity management have been proposed that take advantage of a chronic care model (CCM), including patient self-care, the use of community-based resources, and the realization of care continuity through ongoing communications with patients, information technology, and public policy changes. Payer-sponsored disease management programs represent an important conduit to delivering population-based care founded on similar CCM concepts. Disease management is founded on population-based disease identification, evidence-based care protocols, and collaborative practices between clinicians. While substantial clinician training, technology infrastructure commitments, and financial support at the payer level will be needed for the success of disease management programs in obesity and cardiometabolic risk reduction, these barriers can be overcome with the proper commitment. Disease management programs represent an important tool to combat the growing societal risks of overweight and obesity.

  2. Management of Microbiologically Influenced Corrosion in Risk-Based Inspection Analysis

    DEFF Research Database (Denmark)

    Skovhus, Torben Lund; Andersen, Erlend S.; Hillier, Elisabeth

    2018-01-01

    Operating offshore oil and gas production facilities is often associated with high risk. To manage the risk, operators commonly use aids to support decision making in the establishment of a maintenance and inspection strategy. Risk-based inspection (RBI) analysis is widely used in the offshore...... industry as a means to justify the inspection strategy adopted. The RBI analysis is a decision-making technique that enables asset managers to identify the risk related to failure of their most critical systems and components, with an effect on safety, environmental, and business-related issues. Risk...... influenced corrosion (MIC) is a degradation mechanism that has received increased attention from corrosion engineers and asset operators in the past decades. In this paper, the most recent models that have been developed to assess the impact of MIC on asset integrity will be presented and discussed. From...

  3. A risk-based monitoring framework for the long term management of used fuel

    International Nuclear Information System (INIS)

    Garisto, N.C.

    2006-01-01

    The Nuclear Waste Management Organization has a mandate from the Government of Canada to consult with the public and to recommend an approach for managing Canada's used nuclear fuel. Three main fuel management methods are being explored and evaluated by the Nuclear Waste Management Organization: disposal in a Deep Geological Repository (DGR); reactor-site extended storage (RES); and centralized extended storage (CES), either above ground or below ground. The used nuclear fuel management system, whether a DGR or an extended storage system will require monitoring. In this study, a risk-based monitoring framework was developed for the used fuel management program. The proposed approach addresses the unique challenges of used fuel management being implemented in a multi-stakeholder process, including: (i) the complexity of the facilities; (ii) the need to consider both science-based risk and perceived risk in the monitoring plans; and (iii) the difficulty in conducting 'invasive' measurements of sealed systems, particularly over a very long time frame. (author)

  4. Prototype development of a web-based participative decision support platform in risk management

    Science.gov (United States)

    Aye, Zar Chi; Olyazadeh, Roya; Jaboyedoff, Michel; Derron, Marc-Henri

    2014-05-01

    This paper discusses the proposed background architecture and prototype development of an internet-based decision support system (DSS) in the field of natural hazards and risk management using open-source geospatial software and web technologies. It is based on a three-tier, client-server architecture with the support of boundless (opengeo) framework and its client side SDK application environment using customized gxp components and data utility classes. The main purpose of the system is to integrate the workflow of risk management systematically with the diverse involvement of stakeholders from different organizations dealing with natural hazards and risk for evaluation of management measures through the active online participation approach. It aims to develop an adaptive user friendly, web-based environment that allows the users to set up risk management strategies based on actual context and data by integrating web-GIS and DSS functionality associated with process flow and other visualization tools. Web-GIS interface has been integrated within the DSS to deliver maps and provide certain geo-processing capabilities on the web, which can be easily accessible and shared by different organizations located in case study sites of the project. This platform could be envisaged not only as a common web-based platform for the centralized sharing of data such as hazard maps, elements at risk maps and additional information but also to ensure an integrated platform of risk management where the users could upload data, analyze risk and identify possible alternative scenarios for risk reduction especially for floods and landslides, either quantitatively or qualitatively depending on the risk information provided by the stakeholders in case study regions. The level of involvement, access to and interaction with the provided functionality of the system varies depending on the roles and responsibilities of the stakeholders, for example, only the experts (planners, geological

  5. Investigation of risk management auditing

    International Nuclear Information System (INIS)

    Cao Lu

    2012-01-01

    2004, COSO published 'Enterprise Risk Management Framework', 2009, SASAC issued the 'central enterprise-wide risk management guidelines' to promote risk management within the formal state-owned enterprises in medium and large. Nuclear Group, which risk management in all branches to carry out the project homeopathic, and A Ⅱ will carry out risk management program as the first unit has accumulated more experience. This article from the perspective of internal control, based on the company's risk management practices carried out to try for the nuclear power enterprise risk management audit to describe and propose new ideas. Which expounds the significance of risk management, audit, risk management audit of the ways and means, for practical application of risk management audit of a representative summary of the issues and the ways and means to solve the problem of forward-looking recommendations. (authors)

  6. Study on the evaluation system for the coal safety management based on risk pre-control

    Institute of Scientific and Technical Information of China (English)

    LI Xin-chun; XU Hai-xia; WANG Pei; SONG Xue-feng

    2009-01-01

    The new type of risk management is process management.First,the hazard sources are identified before coal mine accidents occur,and then the pre-control measure and information monitoring method based on classifying the hidden hazard sources are given.Lastly,the risk pre-alarm and risk control method are confirmed,the management standard and management measure are used to eliminate the hidden hazard sources.In this study,an evaluation system is built to evaluate the result of risk management.

  7. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  8. The role of risk-based prioritization in total quality management

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, C.T.

    1994-10-01

    The climate in which government managers must make decisions grows more complex and uncertain. All stakeholders - the public, industry, and Congress - are demanding greater consciousness, responsibility, and accountability of programs and their budgets. Yet, managerial decisions have become multifaceted, involve greater risk, and operate over much longer time periods. Over the last four or five decades, as policy analysis and decisions became more complex, scientists from psychology, operations research, systems science, and economics have developed a more or less coherent process called decision analysis to aid program management. The process of decision analysis - a systems theoretic approach - provides the backdrop for this paper. The Laboratory Integrated Prioritization System (LIPS) has been developed as a systems analytic and risk-based prioritization tool to aid the management of the Tri-Labs` (Lawrence Livermore, Los Alamos, and Sandia) operating resources. Preliminary analyses of the effects of LIPS has confirmed the practical benefits of decision and systems sciences - the systematic, quantitative reduction in uncertainty. To date, the use of LIPS - and, hence, its value - has been restricted to resource allocation within the Tri-Labs` operations budgets. This report extends the role of risk-based prioritization to the support of DOE Total Quality Management (TQM) programs. Furthermore, this paper will argue for the requirement to institutionalize an evolutionary, decision theoretic approach to the policy analysis of the Department of Energy`s Program Budget.

  9. Risk management at university

    OpenAIRE

    Ivanova, H.; Abramovich, S.

    2013-01-01

    This article observes the basic recommendations for the risk management system in higher education as an example Yanka Kupala State University of Grodno. Consider the risk-management standard that based in a process approach

  10. Waste management project’s alternatives: A risk-based multi-criteria assessment (RBMCA) approach

    International Nuclear Information System (INIS)

    Karmperis, Athanasios C.; Sotirchos, Anastasios; Aravossis, Konstantinos; Tatsiopoulos, Ilias P.

    2012-01-01

    Highlights: ► We examine the evaluation of a waste management project’s alternatives. ► We present a novel risk-based multi-criteria assessment (RBMCA) approach. ► In the RBMCA the evaluation criteria are based on the quantitative risk analysis of the project’s alternatives. ► Correlation between the criteria weight values and the decision makers’ risk preferences is examined. ► Preference to the multi-criteria against the one-criterion evaluation process is discussed. - Abstract: This paper examines the evaluation of a waste management project’s alternatives through a quantitative risk analysis. Cost benefit analysis is a widely used method, in which the investments are mainly assessed through the calculation of their evaluation indicators, namely benefit/cost (B/C) ratios, as well as the quantification of their financial, technical, environmental and social risks. Herein, a novel approach in the form of risk-based multi-criteria assessment (RBMCA) is introduced, which can be used by decision makers, in order to select the optimum alternative of a waste management project. Specifically, decision makers use multiple criteria, which are based on the cumulative probability distribution functions of the alternatives’ B/C ratios. The RBMCA system is used for the evaluation of a waste incineration project’s alternatives, where the correlation between the criteria weight values and the decision makers’ risk preferences is analyzed and useful conclusions are discussed.

  11. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  12. Examining the Perceived Value of Integration of Earned Value Management with Risk Management-Based Performance Measurement Baseline

    Science.gov (United States)

    Shah, Akhtar H.

    2014-01-01

    Many projects fail despite the use of evidence-based project management practices such as Performance Measurement Baseline (PMB), Earned Value Management (EVM) and Risk Management (RM). Although previous researchers have found that integrated project management techniques could be more valuable than the same techniques used by themselves, these…

  13. Supply chain risk management

    OpenAIRE

    Christian Hollstein; Frank Himpel

    2013-01-01

    Background: Supply chain risk management increasingly gains prominence in many international industries. In order to strengthen supply chain structures, processes, and networks, adequate potentials for risk management need to be built (focus on effective logistics) and to be utilized (focus on efficient logistics). Natural-based disasters, such as the case of Fukushima, illustrate how crucial risk management is. Method: By aligning a theoretical-conceptual framework with empirical-induct...

  14. Rethinking the Risk Management Process for Genetically Engineered Crop Varieties in Small-scale, Traditionally Based Agriculture

    Directory of Open Access Journals (Sweden)

    David A. Cleveland

    2005-06-01

    Full Text Available Proponents of genetically engineered (GE crops often assume that the risk management used in the industrial world is appropriate for small-scale, traditionally based agriculture in the Third World. Opponents of GE crops often assume that risk management is inappropriate for the Third World, because it is inherently biased in favor of the industrial world. We examine both of these assumptions, by rethinking risk management for GE crops and transgenes, using the example of maize transgene flow from the U.S. to Mexico. Risk management for the Third World is a necessary first step of a broader benefit-cost analysis of GE crops, which would include comparisons with existing varieties and with alternative varieties such as transgenic farmer varieties and organic varieties. Our goal is to use existing information on GE crops and on the social and biological characteristics of Third World agriculture to identify key processes that need to be considered in risk management, and the additional research required to adequately understand them. The four main steps in risk management are hazard identification, risk analysis (exposure x harm, risk evaluation, and risk treatment. We use informal event trees to identify possible exposure to GE crops and transgenes, and resulting biological and social harm; give examples of farmers' ability to evaluate social harm; and discuss the possibilities for risk treatment. We conclude that risk management is relevant for Third World agriculture, but needs to be based on the unique biological and social characteristics of small-scale, traditionally based agriculture, including the knowledge and values of Third World farmers and consumers.

  15. An Integrated Web-based Decision Support System in Disaster Risk Management

    Science.gov (United States)

    Aye, Z. C.; Jaboyedoff, M.; Derron, M. H.

    2012-04-01

    Nowadays, web based decision support systems (DSS) play an essential role in disaster risk management because of their supporting abilities which help the decision makers to improve their performances and make better decisions without needing to solve complex problems while reducing human resources and time. Since the decision making process is one of the main factors which highly influence the damages and losses of society, it is extremely important to make right decisions at right time by combining available risk information with advanced web technology of Geographic Information System (GIS) and Decision Support System (DSS). This paper presents an integrated web-based decision support system (DSS) of how to use risk information in risk management efficiently and effectively while highlighting the importance of a decision support system in the field of risk reduction. Beyond the conventional systems, it provides the users to define their own strategies starting from risk identification to the risk reduction, which leads to an integrated approach in risk management. In addition, it also considers the complexity of changing environment from different perspectives and sectors with diverse stakeholders' involvement in the development process. The aim of this platform is to contribute a part towards the natural hazards and geosciences society by developing an open-source web platform where the users can analyze risk profiles and make decisions by performing cost benefit analysis, Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) with the support of others tools and resources provided. There are different access rights to the system depending on the user profiles and their responsibilities. The system is still under development and the current version provides maps viewing, basic GIS functionality, assessment of important infrastructures (e.g. bridge, hospital, etc.) affected by landslides and visualization of the impact

  16. Continuous Risk Management: An Overview

    Science.gov (United States)

    Rosenberg, Linda; Hammer, Theodore F.

    1999-01-01

    Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  17. Probability concepts in quality risk management.

    Science.gov (United States)

    Claycamp, H Gregg

    2012-01-01

    Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although risk is generally a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management tools are relatively silent on the meaning and uses of "probability." The probability concept is typically applied by risk managers as a combination of frequency-based calculation and a "degree of belief" meaning of probability. Probability as a concept that is crucial for understanding and managing risk is discussed through examples from the most general, scenario-defining and ranking tools that use probability implicitly to more specific probabilistic tools in risk management. A rich history of probability in risk management applied to other fields suggests that high-quality risk management decisions benefit from the implementation of more thoughtful probability concepts in both risk modeling and risk management. Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although "risk" generally describes a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management methodologies and respective tools focus on managing severity but are relatively silent on the in-depth meaning and uses of "probability." Pharmaceutical manufacturers are expanding their use of quality risk management to identify and manage risks to the patient that might occur in phases of the pharmaceutical life cycle from drug development to manufacture, marketing to product discontinuation. A probability concept is typically applied by risk managers as a combination of data-based measures of probability and a subjective "degree of belief" meaning of probability. Probability as

  18. Risk Level Based Management System: a control banding model for occupational health and safety risk management in a highly regulated environment

    Energy Technology Data Exchange (ETDEWEB)

    Zalk, D; Kamerzell, R; Paik, S; Kapp, J; Harrington, D; Swuste, P

    2009-05-27

    The Risk Level Based Management System (RLBMS) is an occupational risk management (ORM) model that focuses occupational safety, hygeiene, and health (OSHH) resources on the highest risk procedures at work. This article demonstrates the model's simplicity through an implementation within a heavily regulated research institution. The model utilizes control banding strategies with a stratification of four risk levels (RLs) for many commonly performed maintenance and support activities, characterizing risk consistently for comparable tasks. RLBMS creates an auditable tracking of activities, maximizes OSHH professional field time, and standardizes documentation and control commensurate to a given task's RL. Validation of RLs and their exposure control effectiveness is collected in a traditional quantitative collection regime for regulatory auditing. However, qualitative risk assessment methods are also used within this validation process. Participatory approaches are used throughout the RLBMS process. Workers are involved in all phases of building, maintaining, and improving this model. This work participation also improves the implementation of established controls.

  19. Gender, Race, and Risk: Intersectional Risk Management in the Sale of Sex Online.

    Science.gov (United States)

    Moorman, Jessica D; Harrison, Kristen

    2016-09-01

    Sex worker experience of risk (e.g., physical violence or rape) is shaped by race, gender, and context. For web-based sex workers, experience of risk is comparatively minimal; what is unclear is how web-based sex workers manage risk and if online advertising plays a role in risk management. Building on intersectionality theory and research exploring risk management in sex work, we content-analyzed 600 escort advertisements from Backpage.com ( http://www.backpage.com ) to explore risk management in web-based sex work. To guide our research we asked: Do advertisements contain risk management messages? Does the use of risk management messaging differ by sex worker race or gender? Which groups have the highest overall use of risk management messages? Through a multivariate analysis of covariance (MANCOVA) we found that advertisements contained risk management messages and that uses of these phrases varied by race and gender. Blacks, women, and transgender women drove the use of risk management messages. Black and White transgender women had the highest overall use of these phrases. We conclude that risk management is an intersectional practice and that the use of risk management messages is a venue-specific manifestation of broader risk management priorities found in all venues where sex is sold.

  20. A literature-based preliminary characterization of risks in the nuclear waste management system

    International Nuclear Information System (INIS)

    Daling, P.M.; Rhoads, R.E.; Van Luik, A.E.

    1990-04-01

    The objectives of this study were to (1) review the literature containing information on risks in the nuclear waste management system and (2) use this information to develop preliminary estimates of the potential magnitudes of these risks. Information was collected on a broad range of risk categories to assist the US Department of Energy (DOE) in communicating information about the risks in the waste management system. The study, which was completed prior to passage of the Nuclear Waste Policy Amendments Act of 1987, examined all of the portions of the nuclear waste management system envisioned by the DOE in the 1985 ''Mission Plant for the Civilian Radioactive Waste Management Program.'' As such, there may be statements in this paper that are not consistent with current DOE positions. The scope of this paper includes the repository, the integral Monitored Retrievable Storage (MRS) facility, and the transportation system that supports the repository and the MRS facility. Based on the results of this analysis, it is concluded that the radiological risks in the waste management system are small relative to nonradiological risks and relative to the risks of exposure to natural background radiation. 6 refs., 2 figs., 2 tabs

  1. Risk Assessment for Bridges Safety Management during Operation Based on Fuzzy Clustering Algorithm

    Directory of Open Access Journals (Sweden)

    Xia Hanyu

    2016-01-01

    Full Text Available In recent years, large span and large sea-crossing bridges are built, bridges accidents caused by improper operational management occur frequently. In order to explore the better methods for risk assessment of the bridges operation departments, the method based on fuzzy clustering algorithm is selected. Then, the implementation steps of fuzzy clustering algorithm are described, the risk evaluation system is built, and Taizhou Bridge is selected as an example, the quantitation of risk factors is described. After that, the clustering algorithm based on fuzzy equivalence is calculated on MATLAB 2010a. In the last, Taizhou Bridge operation management departments are classified and sorted according to the degree of risk, and the safety situation of operation departments is analyzed.

  2. An integrated risk assessment tool for team-based periodontal disease management.

    Science.gov (United States)

    Thyvalikakath, Thankam P; Padman, Rema; Gupta, Sugandh

    2013-01-01

    Mounting evidence suggests a potential association of periodontal disease with systemic diseases such as diabetes, cardiovascular disease, cancer and stroke. The objective of this study is to develop an integrated risk assessment tool that displays a patients' risk for periodontal disease in the context of their systemic disease, social habits and oral health. Such a tool will be used by not just dental professionals but also by care providers who participate in the team-based care for chronic disease management. Displaying relationships between risk factors and its influence on the patient's general health could be a powerful educational and disease management tool for patients and clinicians. It may also improve the coordination of care provided by the provider-members of a chronic care team.

  3. Optimizing risk management

    International Nuclear Information System (INIS)

    Kindred, G.W.

    2000-01-01

    Commercial nuclear power plant management is focussed on the safe, efficient, economical production of electricity. To accomplish the safe aspect of the equation, risk must be determined for the operation and maintenance of the facility. To accomplish the efficient aspect of the equation, management must understand those risks and factor risk insights into their decision process. The final piece of the equation is economical which is accomplished by minimizing, plant outage durations and proper utilization of resources. Probabilistic Risk Assessment can provide the risk insights to accomplish all three; safety, efficiency, and economically. How? Safe production of electricity can be quantified by use of PRA modeling and other risk insights that can determine the core damage frequency. Efficient production of electricity can be influenced by providing management with quantified risk insights for use in decision making. And, one example of economical production of electricity is by not having over conservative deterministic based defense in depth approaches to system maintenance and availability. By using risk-informed insights nuclear safety can be quantified and risk can be managed. Confidence in this approach can be achieved by ensuring the content and quality of the PRA is standardized throughout the industry. The time has arrived for Probabilistic Risk Assessment to take an active position as a major role player in the safe, efficient, and economical operation of commercial nuclear power plants. (author)

  4. Chronic kidney disease risk reduction in a Hispanic population through pharmacist-based disease-state management.

    Science.gov (United States)

    Leal, Sandra; Soto, Marisa

    2008-04-01

    The purpose of this study was to evaluate the ability of a pharmacist-based disease-state management service to improve the care of indigent, predominately Spanish-speaking patients with diabetes mellitus and common comorbid conditions at high risk for the development of chronic kidney disease (CKD). Patients at high risk for developing CKD who have diabetes at a community health center were placed in a pharmacist-based disease state management service for CKD risk reduction. A residency-trained, bilingual, certified diabetes educator, with a PharmD served as the patient's provider using diagnostic, educational, and therapeutic management services under a medical staff approved collaborative practice agreement. Outcomes were assessed by using national standards of care for disease control and prevention screening. The impact on CKD was shown with a mean A1C decrease of 2% and improvement in the proportion of patients at target goals for blood pressure, A1C, and cholesterol levels and receiving aspirin and angiotensin-converting enzyme inhibitor/angiotensin receptor blocker. A pharmacist-based disease-state management service for CKD risk reduction, care of diabetes, and frequently associated comorbid conditions improved compliance with national standards for diabetes care in a high-risk population.

  5. The Supply Chain Risk Management

    OpenAIRE

    Skitsko Volodymyr I.; Voynikov Mykola Yu.

    2018-01-01

    The article considers current approaches of risk-management in supply chains, the main steps of the risk management process are analyzed and detailed both for a separate enterprise – participant of supply chain, for the supply chain in general, and for the Beer game, based on the international risk management standards. The article provides a way to assess the risks of the «producer» in the Beer game according to the three strategies of its behavior, which presumably can correspond to differe...

  6. Risk-based management system development for the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Davis, M.L.; Eide, S.A.

    1990-01-01

    A Risk-Based Management System (RBMS) is being developed to facilitate the use of the Advanced Test Reactor (ATR) probabilistic risk assessment to support ATR operation. Most ATR RBMS questions can best be answered using the System Analysis and Risk Assessment System (SARA) developed at the Idaho National Engineering Laboratory. However, some applications may require employment of the other four codes used to develop and report the PRA. These four codes include the Integrated Reliability and Risk Analysis System (IRRAS), SETS, ETA-II, and the Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR). The ATR RBMS will evolve over three years, and will include the results of the Level 3 and external events analysis

  7. Menopause management: a cardiovascular risk-based approach.

    Science.gov (United States)

    Haines, C J; Farrell, E

    2010-08-01

    Hormone replacement therapy (HRT) remains the gold standard for the management of menopausal symptoms; however, HRT use has declined due to concerns over possible adverse side-effects. Approaches to menopause management are continually being revised and these extend beyond the control of recognized menopausal symptoms to encompass wider aspects of menopausal women's health. Hypertension and associated cardiovascular risk are particularly important unmet needs in postmenopausal women, especially in the Asia-Pacific region which has a rapidly aging population and bears around half of the global burden of cardiovascular disease, two-thirds of which has been attributed to elevated blood pressure. As first point of contact for women with menopausal symptoms, gynecologists play a gatekeeper role in assessing women's health, providing appropriate lifestyle counseling, and, where appropriate, implementing treatment or referral to relevant specialists. This paper, with contributions by gynecologists and cardiologists from Asia Pacific and beyond, summarizes available evidence and provides a treatment algorithm that employs a flexible blood pressure classification strategy to assist physicians in their decision-making for the individualized management of menopausal symptoms in women with low, moderate and high cardiovascular risk, and also for women with diabetes. Individualized HRT according to cardiovascular risk may yield improvements in cardiovascular health, as well as managing menopausal symptoms.

  8. Risk management.

    Science.gov (United States)

    Chambers, David W

    2010-01-01

    Every plan contains risk. To proceed without planning some means of managing that risk is to court failure. The basic logic of risk is explained. It consists in identifying a threshold where some corrective action is necessary, the probability of exceeding that threshold, and the attendant cost should the undesired outcome occur. This is the probable cost of failure. Various risk categories in dentistry are identified, including lack of liquidity; poor quality; equipment or procedure failures; employee slips; competitive environments; new regulations; unreliable suppliers, partners, and patients; and threats to one's reputation. It is prudent to make investments in risk management to the extent that the cost of managing the risk is less than the probable loss due to risk failure and when risk management strategies can be matched to type of risk. Four risk management strategies are discussed: insurance, reducing the probability of failure, reducing the costs of failure, and learning. A risk management accounting of the financial meltdown of October 2008 is provided.

  9. IMPLEMENTING A RISK MANAGEMENT STANDARD

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2013-01-01

    Full Text Available After risk management “conquered” more and more project managers’ minds and showed its benefits for business and programs, the need to have a global risk management standard has become a crucial issue in the world of risk management. But having a global risk management standard has been a big challenge, starting from the decision of developing the standard (March-June 2005, to the moment of publishing it, November 2009. So, developing the ISO 31000:2009 standard has been more or less like a bumpy ride. Apparently, the people involved in developing the global risk management standard understood from the very beginning that no challenges are too big, nor any tasks too small and that the task of having a new, comprehensive global risk management standard should be completed with excellence: defining the principles and the framework guiding the risk management process applicable for all type of organizations and for a wide range of activities. Coming up with a global standard should always be based on the real organizations’ needs and should fulfill real risk management requirements. The article is trying to present the pros and cons of risk management standard implementation, challenging the implementation process itself and the added value of implementing the standard due to the lack of implementation enablers, like risk culture, a real problem especially in an international environment.

  10. Cattle farmers’ perceptions of risk and risk management strategies

    DEFF Research Database (Denmark)

    Bishu, Kinfe G.; O'Reilly, Seamus; Lahiff, Edward

    2018-01-01

    This study analyzes cattle farmers’ perceptions of risk and risk management strategies in Tigray, Northern Ethiopia. We use survey data from a sample of 356 farmers based on multistage random sampling. Factor analysis is employed to classify scores of risk and management strategies, and multiple...... utilization were perceived as the most important strategies for managing risks. Livestock disease and labor shortage were perceived as less of a risk by farmers who adopted the practice of zero grazing compared to other farmers, pointing to the potential of this practice for risk reduction. We find strong...... evidence that farmers engage in multiple risk management practices in order to reduce losses from cattle morbidity and mortality. The results suggest that government strategies that aim at reducing farmers’ risk need to be tailored to specific farm and farmer characteristics. Findings from this study have...

  11. Problem-Based Teaching in International Management: A Political/Economic Risk Assessment Exercise

    Science.gov (United States)

    Daly, Paula S.; White, Marion M.; Zisk, Daniel S.; Cavazos, David E.

    2013-01-01

    This article draws from the current literature to examine problem-based learning (PBL) as a management education tool, and provides an example of how to incorporate PBL into an undergraduate international management course. Also included are an explanation of, and specific guidelines for, a PBL exercise focused on the analysis of "country risk"…

  12. Risk management

    OpenAIRE

    Mcmanus, John

    2009-01-01

    Few projects are completed on time, on budget, and to their original requirement or specifications. Focusing on what project managers need to know about risk in the pursuit of delivering projects, Risk Management covers key components of the risk management process and the software development process, as well as best practices for risk identification, risk planning, and risk analysis. The book examines risk planning, risk analysis responses to risk, the tracking and modelling of risks, intel...

  13. A new active portfolio risk management for an electricity retailer based on a drawdown risk preference

    International Nuclear Information System (INIS)

    Charwand, Mansour; Gitizadeh, Mohsen; Siano, Pierluigi

    2017-01-01

    This paper addresses the deciding under uncertainty of an electricity retailer in order to maximise its total expected rate of return. The developed methodology is based on the modelling of the stochastic evolution of zonal prices that seeks to manage a portfolio of different contracts. Retailer's load and the price at each zone are forecasted using the seasonal autoregressive integrated moving average (SARIMA) model and a clustering technique is used for scenario reduction. Supply sources include the pool, self-production facilities, forward and bilateral contracts. The risk of cost fluctuation due to uncertainties is explicitly modelled using the multi-scenario drawdown methodology. This risk function quantifies in aggregated format the frequency and magnitude of the portfolio drawdowns over planning horizon. In-sample and out-of-sample runs are performed for a portfolio allocation problem. Carried out experimental results on the basis of realistic data, show that imposing risk constraints improve the “real” performance of a portfolio management in out-of-sample runs. - Highlights: • A new drawdown-based method is introduced to retailer deciding under uncertainty. • This tool is used to assess the risk levels regarding retailer midterm strategies. • The methodology is based on the modeling of the stochastic evolution of zonal prices. • The risk function quantifies the frequency and magnitude of the portfolio drawdowns. • In-sample and out-of-sample runs are performed for a portfolio allocation problem.

  14. Selecting Copulas for Risk Management

    NARCIS (Netherlands)

    H.J.W.G. Kole (Erik); C.G. Koedijk (Kees); M.J.C.M. Verbeek (Marno)

    2006-01-01

    textabstractCopulas offer financial risk managers a powerful tool to model the dependence between the different elements of a portfolio and are preferable to the traditional, correlation-based approach. In this paper we show the importance of selecting an accurate copula for risk management. We

  15. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    Science.gov (United States)

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  16. The NASA risk management program

    International Nuclear Information System (INIS)

    Buchbinder, B.; Philipson, L.L.

    1989-01-01

    This paper reports that the NASA Risk Management Program has been established to ensure the appropriate application of risk-based procedures in support of the elimination, reduction, or acceptance of significant safety risks of concern in NASA. The term appropriate is emphasized, in that the particular procedures applied to each given risk are to reflect its character and prioritized importance, the technological and economic feasibility of its treatment. A number of key documents have been produced in support of this implementation. Databases, risk analysis tools, and risk communication procedures requisite to the execution of the risk management functions also are being developed or documented. Several risk management applications have been made and a comprehensive application to a major new NASA program is underway. This paper summarizes the development and current status of the NASA Risk Management Program. Some principal actions that have been carried out in NASA in consonance with the program are noted particularly, and views are presented on the program's likely future directions

  17. Leaching characteristics, ecotoxicity, and risk assessment based management of mine wastes

    Science.gov (United States)

    Kim, J.; Ju, W. J.; Jho, E. H.; Nam, K.; Hong, J. K.

    2016-12-01

    Mine wastes generated during mining activities in metal mines generally contain high concentrations of metals that may impose toxic effects to surrounding environment. Thus, it is necessary to properly assess the mining-impacted landscapes for management. The study investigated leaching characteristics, potential environmental effects, and human health risk of mine wastes from three different metal mines in South Korea (molybdenum mine, lead-zinc mine, and magnetite mine). The heavy metal concentrations in the leachates obtained by using the Korean Standard Test Method for Solid Wastes (STM), Toxicity Characteristics Leaching Procedure (TCLP), and Synthetic Precipitation Leaching Procedure (SPLP) met the Korea Waste Control Act and the USEPA region 3 regulatory levels accordingly, even though the mine wastes contained high concentrations of metals. Assuming that the leachates may get into nearby water sources, the leachate toxicity was tested using Daphnia Magna. The toxic unit (TU) values after 24 h and 48 h exposure of all the mine wastes tested met the Korea Allowable Effluent Water Quality Standards (TUwaste may have long-term toxic effects (TU>1 for the eluent at L/S of 30) implying that the long-term effect of mine wastes left in mining areas need to be assessed. Considering reuse of mine wastes as a way of managing mine wastes, the human health risk assessment of reusing the lead-zinc mine waste in industrial areas was carried out using the bioavailable fraction of the heavy metals contained in the mine wastes, which was determined by using the Solubility/Bioavailability Research Consortium method. There may be potential carcinogenic risk (9.7E-05) and non-carcinogenic risk (HI, Hazard Index of 1.0E+00) as CR≧1.0E-05 has carcinogenic risk and HI≧1.0E+00 has non-carcinogenic risk. Overall, this study shows that not only the concentration-based assessment but ecological toxic effect and human health risk based assessments can be utilized for mining

  18. Risk Management Practices: The Ghanaian Firms' Perspective ...

    African Journals Online (AJOL)

    Using a quantitative approach the findings of the study are that Ghanaian firms understand risk and risk management. Additionally, operational, liquidity and credit risk are the most dominant risks experienced while risk identification and selection jointly determine risk management practices in Ghana. Based on the findings ...

  19. Strategies for successful software development risk management

    Directory of Open Access Journals (Sweden)

    Marija Boban

    2003-01-01

    Full Text Available Nowadays, software is becoming a major part of enterprise business. Software development is activity connected with advanced technology and high level of knowledge. Risks on software development projects must be successfully mitigated to produce successful software systems. Lack of a defined approach to risk management is one of the common causes for project failures. To improve project chances for success, this work investigates common risk impact areas to perceive a foundation that can be used to define a common approach to software risk management. Based on typical risk impact areas on software development projects, we propose three risk management strategies suitable for a broad area of enterprises and software development projects with different amounts of connected risks. Proposed strategies define activities that should be performed for successful risk management, the one that will enable software development projects to perceive risks as soon as possible and to solve problems connected with risk materialization. We also propose a risk-based approach to software development planning and risk management as attempts to address and retire the highest impact risks as early as possible in the development process. Proposed strategies should improve risk management on software development projects and help create a successful software solution.

  20. The risk management of perishable supply chain based on coloured Petri Net modeling

    Directory of Open Access Journals (Sweden)

    Lu Liu

    2018-03-01

    Full Text Available The supply chain of perishable products is a combination of information organization, sharing and integration. The information modeling of supply chain is constructed to abstract key quality information including environment information, processing procedures and product quality assessments based on principle of quality safety factors and property of decay rate. The coloured Petri Net is applied for integrated description of independent information classification, aiming at risk identification and risk management framework. Well, according to the quality deterioration tendency, risk grades management and decision-making system are established. Practically, the circulation system of aquatic products is studied in this paper for full processing description. The simulation experiments are manipulated on environmental information, processing information and product quality information by the coloured Petri Net. Eventually, the conclusion turns out precisely as such that the coloured Petri Net conclusive for information classification and information transmission while integrated information management is available of efficient risk identification and decision-making system in supply chain of perishable products. Meanwhile, the validity of evaluating management and shelf-life estimation of perishable products are technically feasible.

  1. An evaluation of a risk-based environmental regulation in Brazil: Limitations to risk management of hazardous installations

    International Nuclear Information System (INIS)

    Naime, Andre

    2017-01-01

    The environmental regulation of hazardous projects with risk-based decision-making processes can lead to a deficient management of human exposure to technological hazards. Such an approach for regulation is criticized for simplifying the complexity of decisions involving the economic, social, and environmental aspects of the installation and operation of hazardous facilities in urban areas. Results of a Brazilian case study indicate that oil and gas transmission pipelines may represent a threat to diverse communities if the relationship between such linear projects and human populations is overlooked by regulatory bodies. Results also corroborate known challenges to the implementation of EIA processes and outline limitations to an effective environmental and risk management. Two preliminary topics are discussed to strengthen similar regulatory practices. Firstly, an effective integration between social impact assessment and risk assessment in EIA processes to have a more comprehensive understanding of the social fabric. Secondly, the advancement of traditional management practices for hazardous installations to pursue a strong transition from assessment and evaluation to management and control and to promote an effective interaction between land-use planning and environmental regulation.

  2. An evaluation of a risk-based environmental regulation in Brazil: Limitations to risk management of hazardous installations

    Energy Technology Data Exchange (ETDEWEB)

    Naime, Andre, E-mail: andre.naime.ibama@gmail.com

    2017-03-15

    The environmental regulation of hazardous projects with risk-based decision-making processes can lead to a deficient management of human exposure to technological hazards. Such an approach for regulation is criticized for simplifying the complexity of decisions involving the economic, social, and environmental aspects of the installation and operation of hazardous facilities in urban areas. Results of a Brazilian case study indicate that oil and gas transmission pipelines may represent a threat to diverse communities if the relationship between such linear projects and human populations is overlooked by regulatory bodies. Results also corroborate known challenges to the implementation of EIA processes and outline limitations to an effective environmental and risk management. Two preliminary topics are discussed to strengthen similar regulatory practices. Firstly, an effective integration between social impact assessment and risk assessment in EIA processes to have a more comprehensive understanding of the social fabric. Secondly, the advancement of traditional management practices for hazardous installations to pursue a strong transition from assessment and evaluation to management and control and to promote an effective interaction between land-use planning and environmental regulation.

  3. Integrating scientific and local knowledge to inform risk-based management approaches for climate adaptation

    Directory of Open Access Journals (Sweden)

    Nathan P. Kettle

    2014-01-01

    Full Text Available Risk-based management approaches to climate adaptation depend on the assessment of potential threats, and their causes, vulnerabilities, and impacts. The refinement of these approaches relies heavily on detailed local knowledge of places and priorities, such as infrastructure, governance structures, and socio-economic conditions, as well as scientific understanding of climate projections and trends. Developing processes that integrate local and scientific knowledge will enhance the value of risk-based management approaches, facilitate group learning and planning processes, and support the capacity of communities to prepare for change. This study uses the Vulnerability, Consequences, and Adaptation Planning Scenarios (VCAPS process, a form of analytic-deliberative dialogue, and the conceptual frameworks of hazard management and climate vulnerability, to integrate scientific and local knowledge. We worked with local government staff in an urbanized barrier island community (Sullivan’s Island, South Carolina to consider climate risks, impacts, and adaptation challenges associated with sea level rise and wastewater and stormwater management. The findings discuss how the process increases understanding of town officials’ views of risks and climate change impacts to barrier islands, the management actions being considered to address of the multiple impacts of concern, and the local tradeoffs and challenges in adaptation planning. We also comment on group learning and specific adaptation tasks, strategies, and needs identified.

  4. RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Buck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic, M.

    2004-01-01

    In the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: - development (RTD); - demonstration (DEMO): - thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: - identification of critical components; - application of a multilevel risk analysis (...from 'screening' to 'detailed analysis'); - determination of PoF (Probability of Failure); - determination of CoF (Consequence of Failure); - optimation of inspection and maintenance plan. From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only 1 for the detailed analysis (probabilistic high temperature fracture mechanics)

  5. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  6. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  7. Calysto: Risk Management for Commercial Manned Spaceflight

    Science.gov (United States)

    Dillaman, Gary

    2012-01-01

    The Calysto: Risk Management for Commercial Manned Spaceflight study analyzes risk management in large enterprises and how to effectively communicate risks across organizations. The Calysto Risk Management tool developed by NASA's Kennedy Space Center's SharePoint team is used and referenced throughout the study. Calysto is a web-base tool built on Microsoft's SharePoint platform. The risk management process at NASA is examined and incorporated in the study. Using risk management standards from industry and specific organizations at the Kennedy Space Center, three methods of communicating and elevating risk are examined. Each method describes details of the effectiveness and plausibility of using the method in the Calysto Risk Management Tool. At the end of the study suggestions are made for future renditions of Calysto.

  8. Risk Management for Point-of-Care Testing

    OpenAIRE

    James, H. Nichols

    2014-01-01

    Point-of-care testing (POCT) is growing in popularity, and with this growth comes an increased chance of errors. Risk management is a way to reduce errors. Originally developed for the manufacturing industry, risk management principles have application for improving the quality of test results in the clinical laboratory. The Clinical and Laboratory Standards Institute (CLSI), EP23-A Laboratory Quality Control based on Risk Management guideline, introduces risk management to the clinical labor...

  9. The Reputation Crisis: Risk Management Based Logical Framework to the Corporate Sustainability

    OpenAIRE

    Yilmaz, Ayse Kucuk; Kucuk, Ferziye

    2010-01-01

    Risk is a constituent part of both the business and the society in which we survive. Reputation is valuable assest for corporates in sustainable way. Integrating risk management with strategy-setting, such as an enterprise risk management (ERM) approach, helps an organization manage its risks to protect and enhance enterprise value in three ways. First, it helps to establish sustainable competitive advantage. Second, it optimizes the cost of managing risk. Third, it helps management improve b...

  10. From CSR to Social Risk Management

    DEFF Research Database (Denmark)

    Taarup Esbensen, Jacob

    2014-01-01

    When it comes to social risks multinational companies (MNC) within Mining are one of the most exposed businesses one can imagine. This paper examines how social risk management is practiced through the case of Teghout copper-molybdenum mine in North- Eastern Armenia, supplemented with evidence from...... other mining MNCs in the country, onsite fieldwork, interviews with key stakeholders, and public available information. This evidence suggest that a standards based social risk management strategy is adopted and that this strategy is based on international Corporate Social Responsibility (CSR) standards...... engagement management systems that is promoted through the standard. The implemented social risk management systems are ineffective because they makes the MNC unable to recognise the value of weak ties and fail to build legitimacy and trust with some of the key stakeholders resulting in the creation of more...

  11. Tailoring Risk Management in Design

    DEFF Research Database (Denmark)

    Tegeltija, M.; Oehmen, J.; McMahon, C. A.

    2018-01-01

    While risk quantification research has grown over the last few decades, only a limited number of studies have addressed the overall process integration of these approaches in design risk management. This paper argues that the choice of risk quantification method has strong implications for several...... process aspects. We investigate current risk management maturity models and suggest an expansion to accommodate requirements originating from the choice of quantification method, and to inform the choice of quantification method, based on other process parameters, validated through 3 case companies....

  12. Risk perception as a driver for risk management policies

    Science.gov (United States)

    Carmona, María; Mañez, María

    2016-04-01

    Risk is generally defined as the "combination of the probability of the occurrence of an event and its negative consequences" ( UNISDR, 2009). However, the perception of a risk differs among cultures regarding different features such as the context,causes, benefits or damage. Risk perception is the subjective valuation of the probability of an event happening and how concerned individuals or groups are with the consequences (Sjöberg, 2004). Our study is based on an existing framework for risk perception (Rehn and Rohrmann, 2000). We analyse the characteristics of the risk perception regarding extreme events (e.g.droughts) and how the perception of the group drives the action to manage the risk. We do this to achieve an overview of the conditions that let stakeholders join each other to improve risk management especially when governments are not reacting properly. For our research, attention is paid on risk perception of Multi-Sector Partnerships not taking into account the individual level of risk perception. We focus on those factors that make risk management effective and increase resilience. Multi-Sector Partnerships, considered as significant governance structures for risk management, might contribute to reduce vulnerability in prone areas to natural hazards and disasters. The Multi-Sector Partnerships used for our research are existing partnerships identified in the cases studies of the European project ENHANCE. We implement a survey to analyse the perception of risk in the case studies. That survey is based on the Cultural Theory (Douglas and Wildavsky, 1982)and the Protection Motivation Theory (Rogers, 1975). We analyse the results using the Qualitative-Comparative Analysis proposed by Ragin in 1987. The results show the main characteristics of a risk culture that are beneficial to manage a risk. Those characteristics are shaped by the perception of risk of the people involved in the partnership, which in turn shapes their risk management. Nevertheless, we

  13. Risk Management and Value Creation

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Roggi, Oliviero

    Corporate failures, periodic recessions, regional debt crises and volatile financial markets have intensified the focus on risk management as the means to deal with turbulent conditions. The ability to respond effectively to abrupt environmental impacts is considered an important source...... of competitive advantage. Yet, surprisingly little research has analyzed whether the presumed advantages of effective risk management are associated with superior outcomes. Here we present a comprehensive study of risk management effectiveness and the relationship to corporate performance based on more than 33......,500 observations in 3,400 firms over the turbulent 20-year period 1991-2010. Determining effective risk management as the ability to reduce earnings and cash flow volatility, we find that both have significant positive relationships to lagged performance measures after controlling for industry effects, company...

  14. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  15. Enterprise risk management

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, C. [Enbridge, Calgary, AB (Canada)

    2015-07-01

    Enterprise risk management (ERM) is a relative new, holistic and strategic approach for managing risks in modern organizations. ERM builds on and extends traditional risk management (RM). Risk is the effect of uncertainty on objectives - positive and/or negative. Risk management is a set of practices used to understand and address risk. ERM is a form of RM that emphasizes risk aggregation and integration. Risk aggregation is combining individual risks into categories ({sup r}olled up{sup )}. risk integration is embedding RM into organizational contexts ({sup b}uilt in{sup )}.

  16. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  17. Mindfulness-Based Interventions for Weight Loss and CVD Risk Management

    Science.gov (United States)

    Fulwiler, Carl; Brewer, Judson A.; Sinnott, Sinead; Loucks, Eric B.

    2017-01-01

    Obesity affects more than one-third of U.S. adults and is a major cause of preventable morbidity and mortality, primarily from cardiovascular disease. Traditional behavioral interventions for weight loss typically focus on diet and exercise habits and often give little attention to the role of stress and emotions in the initiation and maintenance of unhealthy behaviors, which may account for their modest results and considerable variability in outcomes. Stress eating and emotional eating are increasingly recognized as important targets of weight loss interventions. Mindfulness-based interventions were specifically developed to promote greater self-efficacy in coping with stress and negative emotions, and appear to be effective for a variety of conditions. In recent years researchers have begun to study mindfulness interventions for weight loss and CVD risk management. This review describes the rationale for the use of mindfulness in interventions for weight loss and CVD risk management, summarizes the research to date, and suggests priorities for future research. PMID:28405260

  18. Incorporating probabilistic seasonal climate forecasts into river management using a risk-based framework

    Science.gov (United States)

    Sojda, Richard S.; Towler, Erin; Roberts, Mike; Rajagopalan, Balaji

    2013-01-01

    [1] Despite the influence of hydroclimate on river ecosystems, most efforts to date have focused on using climate information to predict streamflow for water supply. However, as water demands intensify and river systems are increasingly stressed, research is needed to explicitly integrate climate into streamflow forecasts that are relevant to river ecosystem management. To this end, we present a five step risk-based framework: (1) define risk tolerance, (2) develop a streamflow forecast model, (3) generate climate forecast ensembles, (4) estimate streamflow ensembles and associated risk, and (5) manage for climate risk. The framework is successfully demonstrated for an unregulated watershed in southwest Montana, where the combination of recent drought and water withdrawals has made it challenging to maintain flows needed for healthy fisheries. We put forth a generalized linear modeling (GLM) approach to develop a suite of tools that skillfully model decision-relevant low flow characteristics in terms of climate predictors. Probabilistic precipitation forecasts are used in conjunction with the GLMs, resulting in season-ahead prediction ensembles that provide the full risk profile. These tools are embedded in an end-to-end risk management framework that directly supports proactive fish conservation efforts. Results show that the use of forecasts can be beneficial to planning, especially in wet years, but historical precipitation forecasts are quite conservative (i.e., not very “sharp”). Synthetic forecasts show that a modest “sharpening” can strongly impact risk and improve skill. We emphasize that use in management depends on defining relevant environmental flows and risk tolerance, requiring local stakeholder involvement.

  19. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  20. A risk-return based model to measure the performance of portfolio management

    Directory of Open Access Journals (Sweden)

    Hamid Reza Vakili Fard

    2014-10-01

    Full Text Available The primary concern in all portfolio management systems is to find a good tradeoff between risk and expected return and a good balance between accepted risk and actual return indicates the performance of a particular portfolio. This paper develops “A-Y Model” to measure the performance of a portfolio and analyze it during the bull and the bear market. This paper considers the daily information of one year before and one year after Iran's 2013 precedential election. The proposed model of this paper provides lost profit and unrealized loss to measure the portfolio performance. The proposed study first ranks the resulted data and then uses some non-parametric methods to see whether there is any change because of the changes in markets on the performance of the portfolio. The results indicate that despite increasing profitable opportunities in bull market, the performance of the portfolio did not match the target risk. As a result, using A-Y Model as a risk and return base model to measure portfolio management's performance appears to reduce risks and increases return of portfolio.

  1. Risk Management method to ERP systems implementation based os critical sucess factors

    Directory of Open Access Journals (Sweden)

    Márcio Saez Caputo

    2004-10-01

    Full Text Available From the second half of years 90, the Enterprise Resource Planning (ERP systems implementation appears like one of the main investment focus related to the use of information technology in the companies, which aimed to acquire competitive advantages through cost reduction and differentiation of products with the use of these systems. ERP implementation showed to be much more than a technology project, involving structural and managing changes, becoming a complex and high risk process for the organizations. In the literature specialized on ERP, there are many examples of the difficulties of this type of project and about implementations that had not reached the expected objectives, frustrating the expectations of the contractors. The present work describes, first of all, the development of a risk management method to ERP systems implementation, based on critical success factors. Then, a case of application of the considered method is analyzed, detailing the steps and the results gotten until the moment. To the end, evidences regarding to how the method helps to improve risk management during ERP implementations are presented.

  2. THEORETICAL BASIS FOR MANAGEMENT OF PERSONNEL RISKS

    OpenAIRE

    Haliashova, Katsiaryna

    2017-01-01

    Necessity of personnel risks management is based on research results. The authors' approaches to the determination of personnel risks and to their management have been explored. The author's definition of the concept of "personnel risks" is proposed. A classification of personnel risks is developed depending on the stage of origin and the tasks of the personnel policy, as well as the methods of management personnel risks in the organization. The article presents a methodical approach to perso...

  3. RISK MANAGEMENT OF GERMAN FRUIT PRODUCERS

    Directory of Open Access Journals (Sweden)

    Annkatrin PORSCH

    2018-03-01

    Full Text Available Horticultural farms in Germany face substantial business risks. However, fruit farms often struggle to implement appropriate risk management processes, and the risk management literature widely has ignored this farm type. The aim of the study was to improve the assessment of risks by farmers and the choice of suitable risk management instruments. Therefore, a risk management process based on subjective probabilities and suitable for small and medium-sized farms was developed, considering the specific needs of family run businesses. An online survey was conducted to achieve a comprehensive view of the risk perception and risk management practices of German fruit producers. Price and production risks are the most relevant risk categories for fruit farmers. However, among single risk sources, those in the people risk category were seen as the most important. Results show significant interactions among risk categories and a significant correlation between loss experience and the rating of risk categories. The assumption that risk averse farmers generally rate risks higher than risk neutral or risk seeking farmers cannot be confirmed. Diversification seems to be the most important risk management instrument for many fruit producers, especially diversification of marketing channels, farm income, and production activities. Further research should focus on the apparent inconsistency between the satisfaction with instruments reported by farmers and the actual implementation of many of them (e.g., hail insurance and anti-hail net. Furthermore, there is a need for research, to develop decision models considering the interactions of risks and risk management instruments, loss experience and risk seeking attitudes.

  4. Rational risk-based decision support for drinking water well managers by optimized monitoring designs

    Science.gov (United States)

    Enzenhöfer, R.; Geiges, A.; Nowak, W.

    2011-12-01

    Advection-based well-head protection zones are commonly used to manage the contamination risk of drinking water wells. Considering the insufficient knowledge about hazards and transport properties within the catchment, current Water Safety Plans recommend that catchment managers and stakeholders know, control and monitor all possible hazards within the catchments and perform rational risk-based decisions. Our goal is to supply catchment managers with the required probabilistic risk information, and to generate tools that allow for optimal and rational allocation of resources between improved monitoring versus extended safety margins and risk mitigation measures. To support risk managers with the indispensable information, we address the epistemic uncertainty of advective-dispersive solute transport and well vulnerability (Enzenhoefer et al., 2011) within a stochastic simulation framework. Our framework can separate between uncertainty of contaminant location and actual dilution of peak concentrations by resolving heterogeneity with high-resolution Monte-Carlo simulation. To keep computational costs low, we solve the reverse temporal moment transport equation. Only in post-processing, we recover the time-dependent solute breakthrough curves and the deduced well vulnerability criteria from temporal moments by non-linear optimization. Our first step towards optimal risk management is optimal positioning of sampling locations and optimal choice of data types to reduce best the epistemic prediction uncertainty for well-head delineation, using the cross-bred Likelihood Uncertainty Estimator (CLUE, Leube et al., 2011) for optimal sampling design. Better monitoring leads to more reliable and realistic protection zones and thus helps catchment managers to better justify smaller, yet conservative safety margins. In order to allow an optimal choice in sampling strategies, we compare the trade-off in monitoring versus the delineation costs by accounting for ill

  5. Managing health and safety risks: Implications for tailoring health and safety management system practices.

    Science.gov (United States)

    Willmer, D R; Haas, E J

    2016-01-01

    As national and international health and safety management system (HSMS) standards are voluntarily accepted or regulated into practice, organizations are making an effort to modify and integrate strategic elements of a connected management system into their daily risk management practices. In high-risk industries such as mining, that effort takes on added importance. The mining industry has long recognized the importance of a more integrated approach to recognizing and responding to site-specific risks, encouraging the adoption of a risk-based management framework. Recently, the U.S. National Mining Association led the development of an industry-specific HSMS built on the strategic frameworks of ANSI: Z10, OHSAS 18001, The American Chemistry Council's Responsible Care, and ILO-OSH 2001. All of these standards provide strategic guidance and focus on how to incorporate a plan-do-check-act cycle into the identification, management and evaluation of worksite risks. This paper details an exploratory study into whether practices associated with executing a risk-based management framework are visible through the actions of an organization's site-level management of health and safety risks. The results of this study show ways that site-level leaders manage day-to-day risk at their operations that can be characterized according to practices associated with a risk-based management framework. Having tangible operational examples of day-to-day risk management can serve as a starting point for evaluating field-level risk assessment efforts and their alignment to overall company efforts at effective risk mitigation through a HSMS or other processes.

  6. Modern Approaches to Risk Management and Their Use in Customs

    Directory of Open Access Journals (Sweden)

    Vita Afanasieva

    2017-04-01

    Full Text Available In the article the analysis of experience and best practices of Europe and the world regarding the methods and tools of risk management in customs affairs. In accordance with the requirements of the Kyoto Convention the risk management is the main basic principle of modern customs control methods, which allows optimal use of resources of customs bodies, without reducing the effectiveness of customs controls, and exempt the majority of foreign trade operators from unnecessary bureaucratic control. Procedures based on risk management, concentrate customs control on areas, where there is the greatest risk, allowing the bulk of goods and individuals relatively free to pass the checkpoint at the customs border Special attention is paid to the principles and methods of risk management and their impact on the simplification of customs procedures through the use of risk-based thinking. The paper discusses the problems concerning the application and implementation of modern risk management techniques in customs procedures subject to the requirements of international standards ISO for the quality management system and risk management based on risk-based thinking.

  7. MO-E-9A-01: Risk Based Quality Management: TG100 In Action

    Energy Technology Data Exchange (ETDEWEB)

    Huq, M [University of Pittsburgh Medical Center, Pittsburgh, PA (United States); Palta, J [Virginia Commonwealth University, Richmond, VA (United States); Dunscombe, P [Tom Baker Cancer Centre, Calgary, AB (Canada); Thomadsen, B [University of Wisconsin, Madison, WI (United States)

    2014-06-15

    One of the goals of quality management in radiation therapy is to gain high confidence that patients will receive the prescribed treatment correctly. To accomplish these goals professional societies such as the American Association of Physicists in Medicine (AAPM) has published many quality assurance (QA), quality control (QC), and quality management (QM) guidance documents. In general, the recommendations provided in these documents have emphasized on performing device-specific QA at the expense of process flow and protection of the patient against catastrophic errors. Analyses of radiation therapy incidents find that they are most often caused by flaws in the overall therapy process, from initial consult through final treatment, than by isolated hardware or computer failures detectable by traditional physics QA. This challenge is shared by many intrinsically hazardous industries. Risk assessment tools and analysis techniques have been developed to define, identify, and eliminate known and/or potential failures, problems, or errors, from a system, process and/or service before they reach the customer. These include, but are not limited to, process mapping, failure modes and effects analysis (FMEA), fault tree analysis (FTA), and establishment of a quality management program that best avoids the faults and risks that have been identified in the overall process. These tools can be easily adapted to radiation therapy practices because of their simplicity and effectiveness to provide efficient ways to enhance the safety and quality of treatment processes. Task group 100 (TG100) of AAPM has developed a risk-based quality management program that uses these tools. This session will be devoted to a discussion of these tools and how these tools can be used in a given radiotherapy clinic to develop a risk based QM program. Learning Objectives: Learn how to design a process map for a radiotherapy process. Learn how to perform a FMEA analysis for a given process. Learn what

  8. MO-E-9A-01: Risk Based Quality Management: TG100 In Action

    International Nuclear Information System (INIS)

    Huq, M; Palta, J; Dunscombe, P; Thomadsen, B

    2014-01-01

    One of the goals of quality management in radiation therapy is to gain high confidence that patients will receive the prescribed treatment correctly. To accomplish these goals professional societies such as the American Association of Physicists in Medicine (AAPM) has published many quality assurance (QA), quality control (QC), and quality management (QM) guidance documents. In general, the recommendations provided in these documents have emphasized on performing device-specific QA at the expense of process flow and protection of the patient against catastrophic errors. Analyses of radiation therapy incidents find that they are most often caused by flaws in the overall therapy process, from initial consult through final treatment, than by isolated hardware or computer failures detectable by traditional physics QA. This challenge is shared by many intrinsically hazardous industries. Risk assessment tools and analysis techniques have been developed to define, identify, and eliminate known and/or potential failures, problems, or errors, from a system, process and/or service before they reach the customer. These include, but are not limited to, process mapping, failure modes and effects analysis (FMEA), fault tree analysis (FTA), and establishment of a quality management program that best avoids the faults and risks that have been identified in the overall process. These tools can be easily adapted to radiation therapy practices because of their simplicity and effectiveness to provide efficient ways to enhance the safety and quality of treatment processes. Task group 100 (TG100) of AAPM has developed a risk-based quality management program that uses these tools. This session will be devoted to a discussion of these tools and how these tools can be used in a given radiotherapy clinic to develop a risk based QM program. Learning Objectives: Learn how to design a process map for a radiotherapy process. Learn how to perform a FMEA analysis for a given process. Learn what

  9. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  10. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  11. Risk management frameworks for human health and environmental risks.

    Science.gov (United States)

    Jardine, Cindy; Hrudey, Steve; Shortreed, John; Craig, Lorraine; Krewski, Daniel; Furgal, Chris; McColl, Stephen

    2003-01-01

    -Making Framework for Identifying, Assessing and Managing Health Risks (Health Canada, 2000). 4. Canadian Environmental Protection Act: Human Health Risk Assessment of Priority Substances(Health Canada, 1994). 5. CSA-Q8550 Risk Management: Guidelines for Decision-Makers (Canada Standards Association, 1997). 6. Risk Assessment in the Federal Government: Managing the Process (US National Research Council, 1983). 7. Understanding Risk: Informing Decisions in a Democratic Society (US National Research Council, 1996). 8. Environmental Health Risk Assessment (enHealth Council of Australia, 2002). 9. A Framework for Ecological Risk Assessment (CCME, 1996). 10. Ecological Risk Assessments of Priority Substances Under the Canadian Environmental Protection Act (Environment Canada, 1996).11. Guidelines for Ecological Risk Assessment (US EPA, 1998b). 12. Proposed Model for Occupational Health Risk Assessment and Management (Rampal & Sadhra, 1999). Based on the extensive review of these frameworks, seven key elements that should be included in a comprehensive framework for human health, ecological, and occupational risk assessment and management were identified: 1. Problem formulation stage. 2. Stakeholder involvement. 3. Communication. 4. Quantitative risk assessment components. 5. Iteration and evaluation. 6. Informed decision making. 7. Flexibility. On the basis of this overarching approach to risk management, the following "checklist" to ensure a good risk management decision is proposed: - Make sure you're solving the right problem. - Consider the problem and the risk within the full context of the situation, using a broad perspective. - Acknowledge, incorporate, and balance the multiple dimensions of risk. - Ensure the highest degree of reliability for all components of the risk management process. - Involve interested and effected parties from the outset of the process. - Commit to honest and open communication between all parties. - Employ continuous evaluation throughout the process

  12. Cognitive mapping tools: review and risk management needs.

    Science.gov (United States)

    Wood, Matthew D; Bostrom, Ann; Bridges, Todd; Linkov, Igor

    2012-08-01

    Risk managers are increasingly interested in incorporating stakeholder beliefs and other human factors into the planning process. Effective risk assessment and management requires understanding perceptions and beliefs of involved stakeholders, and how these beliefs give rise to actions that influence risk management decisions. Formal analyses of risk manager and stakeholder cognitions represent an important first step. Techniques for diagramming stakeholder mental models provide one tool for risk managers to better understand stakeholder beliefs and perceptions concerning risk, and to leverage this new understanding in developing risk management strategies. This article reviews three methodologies for assessing and diagramming stakeholder mental models--decision-analysis-based mental modeling, concept mapping, and semantic web analysis--and assesses them with regard to their ability to address risk manager needs. © 2012 Society for Risk Analysis.

  13. Risk, surprises and black swans fundamental ideas and concepts in risk assessment and risk management

    CERN Document Server

    Aven, Terje

    2014-01-01

    Risk, Surprises and Black Swans provides an in depth analysis of the risk concept with a focus on the critical link to knowledge; and the lack of knowledge, that risk and probability judgements are based on.Based on technical scientific research, this book presents a new perspective to help you understand how to assess and manage surprising, extreme events, known as 'Black Swans'. This approach looks beyond the traditional probability-based principles to offer a broader insight into the important aspects of uncertain events and in doing so explores the ways to manage them.

  14. A risk-based approach to sanitary sewer pipe asset management.

    Science.gov (United States)

    Baah, Kelly; Dubey, Brajesh; Harvey, Richard; McBean, Edward

    2015-02-01

    Wastewater collection systems are an important component of proper management of wastewater to prevent environmental and human health implications from mismanagement of anthropogenic waste. Due to aging and inadequate asset management practices, the wastewater collection assets of many cities around the globe are in a state of rapid decline and in need of urgent attention. Risk management is a tool which can help prioritize resources to better manage and rehabilitate wastewater collection systems. In this study, a risk matrix and a weighted sum multi-criteria decision-matrix are used to assess the consequence and risk of sewer pipe failure for a mid-sized city, using ArcGIS. The methodology shows that six percent of the uninspected sewer pipe assets of the case study have a high consequence of failure while four percent of the assets have a high risk of failure and hence provide priorities for inspection. A map incorporating risk of sewer pipe failure and consequence is developed to facilitate future planning, rehabilitation and maintenance programs. The consequence of failure assessment also includes a novel failure impact factor which captures the effect of structurally defective stormwater pipes on the failure assessment. The methodology recommended in this study can serve as a basis for future planning and decision making and has the potential to be universally applied by municipal sewer pipe asset managers globally to effectively manage the sanitary sewer pipe infrastructure within their jurisdiction. Copyright © 2014 Elsevier B.V. All rights reserved.

  15. Social Risk and the Management of MNCs

    DEFF Research Database (Denmark)

    Taarup Esbensen, Jacob

    2015-01-01

    Multinational companies (MNCs) are increasing being exposed to risk that originate from local communities in the business environment where they operate. The response has been to implement systems for stakeholder engagement by including social issues into their risk management systems. However......” systems, which are based on the capability to identify frames and sensemaking processes. This paper show how social risk management can be conventionalised using distinct theoretical domains taking its outset in a sociological perspective on risk, linking International Business (IB) risk management...

  16. Genomic-based tools for the risk assessment, management, and prevention of type 2 diabetes

    Directory of Open Access Journals (Sweden)

    Johansen Taber KA

    2015-01-01

    Full Text Available Katherine A Johansen Taber, Barry D DickinsonDepartment of Science and Biotechnology, American Medical Association, Chicago, IL, USAAbstract: Type 2 diabetes (T2D is a common and serious disorder and is a significant risk factor for the development of cardiovascular disease, neuropathy, nephropathy, retinopathy, periodontal disease, and foot ulcers and amputations. The burden of disease associated with T2D has led to an emphasis on early identification of the millions of individuals at high risk so that management and intervention strategies can be effectively implemented before disease progression begins. With increasing knowledge about the genetic basis of T2D, several genomic-based strategies have been tested for their ability to improve risk assessment, management and prevention. Genetic risk scores have been developed with the intent to more accurately identify those at risk for T2D and to potentially improve motivation and adherence to lifestyle modification programs. In addition, evidence is building that oral antihyperglycemic medications are subject to pharmacogenomic variation in a substantial number of patients, suggesting genomics may soon play a role in determining the most effective therapies. T2D is a complex disease that affects individuals differently, and risk prediction and treatment may be challenging for health care providers. Genomic approaches hold promise for their potential to improve risk prediction and tailor management for individual patients and to contribute to better health outcomes for those with T2D.Keywords: diabetes, genomic, risk prediction, management

  17. [Global risk management].

    Science.gov (United States)

    Sghaier, W; Hergon, E; Desroches, A

    2015-08-01

    Risk management is a fundamental component of any successful company, whether it is in economic, societal or environmental aspect. Risk management is an especially important activity for companies that optimal security challenge of products and services is great. This is the case especially for the health sector institutions. Risk management is therefore a decision support tool and a means to ensure the sustainability of an organization. In this context, what methods and approaches implemented to manage the risks? Through this state of the art, we are interested in the concept of risk and risk management processes. Then we focus on the different methods of risk management and the criteria for choosing among these methods. Finally we highlight the need to supplement these methods by a systemic and global approach including through risk assessment by the audits. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  18. Value-oriented risk management of insurance companies

    CERN Document Server

    Kriele, Marcus

    2014-01-01

    Value- and risk-oriented management is a holistic method of managing businesses. In this book both actuarial methods and methods pertaining to classical internal control and classical risk management are used. Therefore the approach taken is necessarily interdisciplinary. Indeed, there is a new dynamically developing field for actuaries as a result of the emphasis now on the measurement of risk. This book provides the required basic knowledge for this subject from an actuarial perspective. It enables the reader to implement in practice a risk management system that is based on quantitative methods. With this book, the reader will additionally be able to critically appraise the applicability and the limits of the methods used in modern risk management. Value- Oriented Risk Management of Insurance Companies focuses on risk capital, capital allocation, performance measurement and value-oriented management. It also makes a connection to regulatory developments (for example, Solvency II). The reader should have...

  19. Risk-based investment trade-off related to building facility management

    Energy Technology Data Exchange (ETDEWEB)

    Taillandier, F. [Departement TIDS, Centre Scientifique et Technique du Batiment, 06904 Sophia Antipolis (France); Laboratoire Optimisation de la conception et Ingenierie de l' environnement, Polytech' Savoie, Universite de Savoie, 73376 Le Bourget du lac (France)], E-mail: franck.taillandier@univ-savoie.fr; Sauce, G. [Laboratoire Optimisation de la conception et Ingenierie de l' environnement, Polytech' Savoie, Universite de Savoie, 73376 Le Bourget du lac (France); Bonetto, R. [Departement TIDS, Centre Scientifique et Technique du Batiment, 06904 Sophia Antipolis (France)

    2009-04-15

    Due to his or her profession, any building facility manager has to face many decision-making situations. One of the most important to be mentioned is the arbitration of a multi-year maintenance plan for buildings. Deciding between proposed maintenance actions, according to several constraints, so as to aim at satisfying corporate strategy is a complex choice. Risk approaches can be particularly effective because of their ability to handle complexity and uncertainties. The problem is then to be able to propose a method considering risks, adapted to the specific context of building facility management. Our method, regarded as a traditional approach, includes needed resources (i.e. costs) according to constraints (i.e. budget), but it also considers several risk domains (safety, technical preservation, client satisfaction, etc.), through the consequences (gain and loss). It proposes an ergonomic arbitration system based on filters following two complementary approaches: a selection of the fundamental actions and then an optimization of the plan (in a global view). The aim, for decision-makers, is to build their own solution by testing multiple angles of vision in simulation logic. This article presents the principles of the method, illustrated by an example of a real case conducted for a leading French company.

  20. Risk-based investment trade-off related to building facility management

    International Nuclear Information System (INIS)

    Taillandier, F.; Sauce, G.; Bonetto, R.

    2009-01-01

    Due to his or her profession, any building facility manager has to face many decision-making situations. One of the most important to be mentioned is the arbitration of a multi-year maintenance plan for buildings. Deciding between proposed maintenance actions, according to several constraints, so as to aim at satisfying corporate strategy is a complex choice. Risk approaches can be particularly effective because of their ability to handle complexity and uncertainties. The problem is then to be able to propose a method considering risks, adapted to the specific context of building facility management. Our method, regarded as a traditional approach, includes needed resources (i.e. costs) according to constraints (i.e. budget), but it also considers several risk domains (safety, technical preservation, client satisfaction, etc.), through the consequences (gain and loss). It proposes an ergonomic arbitration system based on filters following two complementary approaches: a selection of the fundamental actions and then an optimization of the plan (in a global view). The aim, for decision-makers, is to build their own solution by testing multiple angles of vision in simulation logic. This article presents the principles of the method, illustrated by an example of a real case conducted for a leading French company

  1. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book...... is framed around the challenges imposed on executives and directors in dealing with an increasingly complex and unpredictable world. This requires a new risk leadership focus that not only avoids the downside risks but also considers ways to exploit the upside potential offered by a dynamic environment....... The underlying logic is built on the principles of financial economics where benefits derive from reducing bankruptcy costs and increasing future cash inflows. This provides a stringent framework for analyzing the effect of different risk management actions and behaviors in effective risk-taking organizations...

  2. International and Russian practice of banking risk-management. Mortgage risks

    Directory of Open Access Journals (Sweden)

    A. V. Nikolaeva

    2016-01-01

    Full Text Available The goal of the work is to compare Russian norms and standards of risk management of mortgage lending with international standards of risk management based on the documents of the Basel Committee. The article also aims to analyze new banking tools of risk management of mortgage lending, that arise in connection with the application of international norms and standards of risk management.Materials and Methods: The main documents considered in the article are the agreements on capital, issued by the Basel Committee on Banking Supervision: Basel-I (1988, Basel-II (2004 and Basel-III (2010, as well as instructions and standing orders issued by the Central Bank of Russia, including: Instruction № 139-I "Ob obiazatel'nykh normativakh bankov", instruction № 1 "O poriadke regulirovaniia deiatel'nosti kommercheskikh bankov", the standing order number 215-P "O metodike opredeleniia sobstvennykh sredstv (kapitala kreditnykh organizatsii", the standing order № 395-P "O metodike opredeleniia velichiny sobstvennykh sredstv (kapitala kreditnykh organizatsii («BAZEL III»" and others. On the basis of these documents the work examines and summarizes the main methods of risk management of mortgage lending, such as: comparison and analysis of risk management techniques, study of the basic documents regulating risk management in banks and generalization of risk management methods in the segment of mortgage lending.Results: The article analyzes the legal and methodological basis of risk management and provides practical methods that can be used in practice for managerial decisions in a constantly changing external economic environment. It also analyses international and native risk management. Russian standards of risk-management are compared with international. The work conducts a critical review of the effects of introduction of international standards in Russia. Special attention is paid to the practice of mortgage risk-management

  3. NGNP Risk Management Database: A Model for Managing Risk

    International Nuclear Information System (INIS)

    Collins, John

    2009-01-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft(reg s ign) Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool's design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  4. NGNP Risk Management Database: A Model for Managing Risk

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  5. The management object in risk management approaches

    OpenAIRE

    Christiansen, Ulrik

    2013-01-01

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible. The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse an...

  6. The Management Object in Risk Management Approaches

    DEFF Research Database (Denmark)

    Christiansen, Ulrik

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible....... The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse and calculate uncertainty and risk. Inspired by social studies of finance and accounting, the paper finally develops...... three propositions that illustrate how the framing of risk establishes a boundary for how managers might understand value creation and the possible future and how this impacts the possible responses to risk....

  7. Risk management study for the retired Hanford Site facilities: Risk management executive summary

    International Nuclear Information System (INIS)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1994-02-01

    This document provides a cost-comparison evaluation for implementing certain risk-reduction measures and their effect on the overall risk of the 100 and 200 Area retired, surplus facilities. The evaluation is based on conditions that existed at the time the risk evaluation team performed facility investigations, and does not acknowledge risk-reduction measures that occurred soon after risk identification. This evaluation is one part of an overall risk management study for these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1450-km 2 Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30 km southeast of the 200 Area. This document is the first in a four volume series that comprise the risk management study for the retired, surplus facilities. Volume 2 is the risk evaluation work procedure; volume 3 provides the results for the risk evaluation; and volume 4 is the risk-reduction cost comparison

  8. A Grey Theory Based Approach to Big Data Risk Management Using FMEA

    Directory of Open Access Journals (Sweden)

    Maisa Mendonça Silva

    2016-01-01

    Full Text Available Big data is the term used to denote enormous sets of data that differ from other classic databases in four main ways: (huge volume, (high velocity, (much greater variety, and (big value. In general, data are stored in a distributed fashion and on computing nodes as a result of which big data may be more susceptible to attacks by hackers. This paper presents a risk model for big data, which comprises Failure Mode and Effects Analysis (FMEA and Grey Theory, more precisely grey relational analysis. This approach has several advantages: it provides a structured approach in order to incorporate the impact of big data risk factors; it facilitates the assessment of risk by breaking down the overall risk to big data; and finally its efficient evaluation criteria can help enterprises reduce the risks associated with big data. In order to illustrate the applicability of our proposal in practice, a numerical example, with realistic data based on expert knowledge, was developed. The numerical example analyzes four dimensions, that is, managing identification and access, registering the device and application, managing the infrastructure, and data governance, and 20 failure modes concerning the vulnerabilities of big data. The results show that the most important aspect of risk to big data relates to data governance.

  9. Risk-based configuration control

    International Nuclear Information System (INIS)

    Szikszai, T.

    1997-01-01

    The presentation discusses the following issues: The Configuration Control; The Risk-based Configuration Control (during power operation mode, and during shutdown mode). PSA requirements. Use of Risk-based Configuration Control System. Configuration Management (basic elements, benefits, information requirements)

  10. Risk management in a university environment.

    Science.gov (United States)

    Brewer, Ann; Walker, Ian

    2011-06-01

    Risk is an integral part of quality assurance in higher education in Australia. This paper describes a generic methodology for the identification and management of risk in a university or similar tertiary education environment and outlines a framework that enables the management of risk to be incorporated in the institution's governance cycle. The new approach here is that risk is embedded in the quality assurance framework and, in turn, in the strategic planning and budgeting processes. In many organisations, risk is implemented as a separate process and not considered in any meaningful way as integral to the strategic direction and performance of the university. The paper is based on work carried out by the authors and others between March 2008 and April 2009 to develop a comprehensive system for managing risk in a major Australian university, including processes whereby risk management could be integrated with, and add value to, the overall governance of the university. The case study is described in the appendix to this paper.

  11. Contradictions Between Risk Management and Sustainable Development

    International Nuclear Information System (INIS)

    Olsen, Odd Einar; Langhelle, Oluf; Engen, Ole A.

    2006-01-01

    The aim of this paper is to discuss how risk management as a methodology and mindset influence on priorities and decisions concerning sustainable development. Management of risks and hazards often rely on partial analysis with a limited time frame. This may lead to a paradoxical situation where risk management and extended use of risk analysis could hamper long term sustainable development. The question is: Does the use of risk and vulnerability analysis (RaV-analysis) hamper or contribute to sustainable development? Because risk management and assessment has a more narrow scope and a limited time perspective based on well established methodologies, the tangible impacts of risk reducing measures in a project is easier to calculate than long-term and intangible impacts on global development. Empirical evidence is still scarce, but our preliminary conclusion is that mainstream risk management and assessments is counterproductive to sustainable development

  12. Contradictions Between Risk Management and Sustainable Development

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Odd Einar; Langhelle, Oluf; Engen, Ole A. [Univ. of Stavanger (Norway). Dept. of Media, Culture and Social Science

    2006-09-15

    The aim of this paper is to discuss how risk management as a methodology and mindset influence on priorities and decisions concerning sustainable development. Management of risks and hazards often rely on partial analysis with a limited time frame. This may lead to a paradoxical situation where risk management and extended use of risk analysis could hamper long term sustainable development. The question is: Does the use of risk and vulnerability analysis (RaV-analysis) hamper or contribute to sustainable development? Because risk management and assessment has a more narrow scope and a limited time perspective based on well established methodologies, the tangible impacts of risk reducing measures in a project is easier to calculate than long-term and intangible impacts on global development. Empirical evidence is still scarce, but our preliminary conclusion is that mainstream risk management and assessments is counterproductive to sustainable development.

  13. Sustainable Risk Management in the Banking Sector

    Directory of Open Access Journals (Sweden)

    Županović Ivo

    2014-01-01

    Full Text Available The globalization of financial markets and negative consequences of the financial crisis resulted in negative connotations in the operation of many financial institutions, businesses and citizens and imposed the need to implement appropriate risk management measures in the banking sector. Evolution of the financial sector makes a lot of news in the field of risk management and particularly the modelling of market, credit and operational risk. The main methodology for risk management is the value-at-risk, which is used in practice with other techniques such as the capital- at-risk method in order to minimize business risks and achieve optimal results in the banking and, generally, financial operations. Accordingly, at all levels of governance in the banking sector, there are prudential policies in place governing the management of all types of financial and operational risks. Based on the abovementioned, the focus of the examination was on the above postulate, and prompt recognition, control and proper management of banking risks.

  14. [What Surgeons Should Know about Risk Management].

    Science.gov (United States)

    Strametz, R; Tannheimer, M; Rall, M

    2017-02-01

    Background: The fact that medical treatment is associated with errors has long been recognized. Based on the principle of "first do no harm", numerous efforts have since been made to prevent such errors or limit their impact. However, recent statistics show that these measures do not sufficiently prevent grave mistakes with serious consequences. Preventable mistakes such as wrong patient or wrong site surgery still frequently occur in error statistics. Methods: Based on insight from research on human error, in due consideration of recent legislative regulations in Germany, the authors give an overview of the clinical risk management tools needed to identify risks in surgery, analyse their causes, and determine adequate measures to manage those risks depending on their relevance. The use and limitations of critical incident reporting systems (CIRS), safety checklists and crisis resource management (CRM) are highlighted. Also the rationale for IT systems to support the risk management process is addressed. Results/Conclusion: No single tool of risk management can be effective as a standalone instrument, but unfolds its effect only when embedded in a superordinate risk management system, which integrates tailor-made elements to increase patient safety into the workflows of each organisation. Competence in choosing adequate tools, effective IT systems to support the risk management process as well as leadership and commitment to constructive handling of human error are crucial components to establish a safety culture in surgery. Georg Thieme Verlag KG Stuttgart · New York.

  15. Agile risk management

    CERN Document Server

    Moran, Alan

    2014-01-01

    This work is the definitive guide for IT managers and agile practitioners. It elucidates the principles of agile risk management and how these relate to individual projects. Explained in clear and concise terms, this synthesis of project risk management and agile techniques is illustrated using the major methodologies such as XP, Scrum and DSDM.Although the agile community frequently cites risk management, research suggests that risk is often narrowly defined and, at best, implicitly treated, which in turn leads to an inability to make informed decisions concerning risk and reward and a poor u

  16. Surveying perceptions of landslide risk management in Norway

    Science.gov (United States)

    Chiu, Jessica Ka Yi; Eidsvig, Unni

    2016-04-01

    Enhanced precipitation due to climate change leads to increase in both frequency and intensity of landslides in Norway. A proactive approach to risk management is therefore required to significantly reduce the losses associated with landslides. Opinions and perceptions from practitioners on the performance of landslide risk management can provide insights on areas for improvement in the landslide risk management strategies in Norway. The Risk Management Index (RMI), proposed by Cardona et al. (2004), is a well-established method to measure perceptions of disaster management of selected actors holistically. The RMI is measured based on opinion questionnaires to technical staff, decision-makers, and stakeholders involved in all stages of risk reduction strategies. It is a composite index that considers a wide variety of strategies to manage risks, including structural and non-structural measures, acceptance strategies, disaster management, and risk transfer. The RMI method was modified to be implemented in landslide hazards and to fit with Norwegian conditions. An opinion survey was conducted in autumn 2015 to measure perceptions of landslide risk management in Norway. Perceptions were surveyed for two time periods: 2015 and 2050, and are based on national, county, and municipality levels. Based on the survey results, performance of landslide risk management at any administrative levels in Norway is perceived to improve from `significant' in 2015 to `significant' to `outstanding' in 2050. Knowledge and technology, climate, risk perceptions, and anthropogenic activities are mostly considered by respondents for their 2050 perceptions. Several aspects of landslide risk management in Norway can be improved. For example, landslide hazard evaluation and mapping should be prioritised in Norway. Upgrading, retrofitting, and reconstruction of assets may also be included in the landslide risk reduction strategies. In addition, there should be more focus on inter

  17. Management of groundwater in farmed pond area using risk-based regulation.

    Science.gov (United States)

    Huang, Jun-Ying; Liao, Chiao-Miao; Lin, Kao-Hung; Lee, Cheng-Haw

    2014-09-01

    Blackfoot disease (BFD) had occurred seriously in the Yichu, Hsuehchia, Putai, and Peimen townships of Chia-Nan District of Taiwan in the early days. These four townships are the districts of fishpond cultivation domestically in Taiwan. Groundwater becomes the main water supply because of short income in surface water. The problems of over pumping in groundwater may not only result in land subsidence and seawater intrusion but also be harmful to the health of human giving rise to the bioaccumulation via food chain in groundwater with arsenic (As). This research uses sequential indicator simulation (SIS) to characterize the spatial arsenic distribution in groundwater in the four townships. Risk assessment is applied to explore the dilution ratio (DR) of groundwater utilization, which is defined as the ratio showing the volume of groundwater utilization compared to pond water, for fish farming in the range of target cancer risk (TR) especially on the magnitude of 10(-4)~10(-6). Our study results reveal that the 50th percentile of groundwater DRs served as a regulation standard can be used to perform fish farm groundwater management for a TR of 10(-6). For a TR of 5 × 10(-6), we suggest using the 75th percentile of DR for groundwater management. For a TR of 10(-5), we suggest using the 95th percentile of the DR standard for performing groundwater management in fish farm areas. For the TR of exceeding 5 × 10(-5), we do not suggest establishing groundwater management standards under these risk standards. Based on the research results, we suggest that establishing a TR at 10(-5) and using the 95th percentile of DR are best for groundwater management in fish farm areas.

  18. Model of Axiological Dimension Risk Management

    Directory of Open Access Journals (Sweden)

    Kulińska Ewa

    2016-01-01

    Full Text Available It was on the basis of the obtained results that identify the key prerequisites for the integration of the management of logistics processes, management of the value creation process, and risk management that the methodological basis for the construction of the axiological dimension of the risk management (ADRM model of logistics processes was determined. By taking into account the contribution of individual concepts to the new research area, its essence was defined as an integrated, structured instrumentation aimed at the identification and implementation of logistics processes supporting creation of the value added as well as the identification and elimination of risk factors disturbing the process of the value creation for internal and external customers. The base for the ADRM concept of logistics processes is the use of the potential being inherent in synergistic effects which are obtained by using prerequisites for the integration of the management of logistics processes, of value creation and risk management as the key determinants of the value creation.

  19. Strategic Risk Management and Corporate Value Creation

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Roggi, Oliviero

    Major corporate failures, periodic recessions, regional debt crises and volatile markets have intensified the focus on corporate risk management as the means to deal better with turbulent business conditions. Hence, the ability to respond effectively to the often dramatic environmental changes...... is considered an important source of competitive advantage. However, surprisingly little research has analyzed if the presumed advantages of effective risk management lead to superior performance or assessed important antecedents of effective risk management capabilities. Here we present a comprehensive study...... of risk management effectiveness and the relationship to corporate performance based on panel data for more than 3,400 firms accounting for over 33,500 annual observations during the turbulent period 1991-2010. Determining effective risk management as the ability to reduce earnings and cash flow...

  20. Fundamentals of risk management understanding, evaluating and implementing effective risk management

    CERN Document Server

    Hopkin, Paul

    2012-01-01

    Now more than ever, organizations must plan, response and recognize all forms of risks that they face. "Fundamentals of Risk Management", now in its second edition, provides a comprehensive introduction to the subject of commercial and business risk for anyone studying for a career in risk as well as a broad range of risk professionals. It examines the key components of risk management and its application with examples to demonstrate its benefit to organisations in the public and private sector. The second edition has been completely updated to take into account the greater influence of ISO 3100, the emergence of Governance Risk and Compliance (GRC) and the wide use of the bowtie method to illustrate risk management. In addition, there is now a chapter on the skills and competencies required by an effective risk manager.

  1. Rethinking risk management

    International Nuclear Information System (INIS)

    Kloman, H.F.

    1992-01-01

    The purpose of this paper is to bring together the ideas of those who currently practice the many different forms of risk management on a global basis. These forms include guidance of public policy on macro risks, risk financing and insurance for many larger commercial organizations, managing credit, currency and interest rate risks for financial institutions, plus other extensions of risk management including security, quality control, and quality assurance in a health-care environment

  2. Risk in Management Systems according to ISO standard

    Directory of Open Access Journals (Sweden)

    P. Królas

    2010-07-01

    Full Text Available The purpose of this article was to present selected management standards in context of risk management. It presents main ISOmanagement standards (ISO 9001, ISO 14001, OHSAS 18001, ISO 27001, BS 25999, ISO 31000 that apply to polish enterprises. In thefirst part of this article there are analyzed management standards regarding quality, environment, occupational health and safety,information security, as well as business continuity management and risk management. The second part of the article discusses the processof dealing with risk based on chosen management standard.

  3. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  4. State-of-the-art risk-based approach to spill contingency planning and risk management

    International Nuclear Information System (INIS)

    Schmidt Etkin, Dagmar; Reilly, Timothy; French McCay, Deborah

    2011-01-01

    The paper proposes incorporating a comprehensive examination of spill risk into risk management and contingency planning, and applying state-of-the-art modeling tools to evaluate various alternatives for appropriate spill response measures and optimize protective responses. The approach allows spill contingency planners and decision-makers to determine the types of spill scenarios that may occur in a particular location or from a particular source and calculate the probability distribution of the various scenarios. The spill probability information is useful in assessing and putting into perspective the various costs options for spill control systems that will be recommended ultimately. Using advanced modeling tools helps in estimating the potential environmental and socioeconomic consequences of each spill scenario based on location-specific factors over a range of stochastic possibilities, simulating spill scenarios and determining optimal responses and protection strategies. The benefits and costs of various response alternatives and variations in response time can be calculated and modeling tools for training and risk allocation/transfer purposes used.

  5. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2000-01-01

    The Nevada Risk Assessment/Management Program (NRAMP) is part of a national effort by the U.S. Department of Energy (DOE) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the NRAMP project and presents a synopsis of the NRAMP effort which occurred from 1995 to 2000. The primary goals of the DOE in awarding the cooperative agreement establishing NRAMP were to (I) use a risk-based approach to evaluate the consequences of alternative actions in DOE's Environmental Remediation Programs at sites in Nevada and (2) use a neutral and credible institution outside the DOE to perform the risk assessments and contribute to public education about environmental management issues at the Nevada Test Site. (author)

  6. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  7. Knowledge management in support of enterprise risk management

    OpenAIRE

    Rodriguez, Eduardo; Edwards, John S.

    2014-01-01

    Risk management and knowledge management have so far been studied almost independently. The evolution of risk management to the holistic view of Enterprise Risk Management requires the destruction of barriers between organizational silos and the exchange and application of knowledge from different risk management areas. However, knowledge management has received little or no attention in risk management. This paper examines possible relationships between knowledge management constructs relate...

  8. Safety Risk Management for Homeland Defense and Security Responders

    National Research Council Canada - National Science Library

    Meyers, Tommey H

    2005-01-01

    .... Coast Guard and the U.S. Navy. This revealed that Operational Risk Management (ORM), a risk-based decision-making tool that systematically balances risk and mission completion, and Crew Resource Management (CRM...

  9. Risk management overview

    International Nuclear Information System (INIS)

    McGovern, S.

    1995-01-01

    Launching of the first natural gas contract by the New York Mercantile Exchange (NYMEX) in April 1990 was a huge success which allowed natural gas to surpass crude oil as the most successful launch of any commodity contract. Despite this unprecedented initial success it must be kept in mind that in a competitive marketplace there are risks of many kinds (market risks, price risks, basis risks, currency risks and timing risks), that parties must deal with in everyday operations. The concept of risk management was defined, techniques and issues in risk management were explained, a glossary of fully explained industry terms, and basic financial tools most often used in risk management, were provided. 11 figs

  10. Radiation risk management at DOE accelerator facilities

    International Nuclear Information System (INIS)

    Dyck, O.B. van.

    1997-01-01

    The DOE accelerator contractors have been discussing among themselves and with the Department how to improve radiation safety risk management. This activity-how to assure prevention of unplanned high exposures-is separate from normal exposure management, which historically has been quite successful. The ad-hoc Committee on the Accelerator Safety Order and Guidance [CASOG], formed by the Accelerator Section of the HPS, has proposed a risk- based approach, which will be discussed. Concepts involved are risk quantification and comparison (including with non-radiation risk), passive and active (reacting) protection systems, and probabilistic analysis. Different models of risk management will be presented, and the changing regulatory environment will also be discussed

  11. Risk management for buildings -- Has the time come?

    Energy Technology Data Exchange (ETDEWEB)

    Berry, D.L.; Hunter, R.L.

    1997-08-01

    There are both incentives and challenges for applying formal risk management processes to buildings and other structures, including bridges, highways, dams, stadiums, shopping centers, and private dwellings. Based on an assessment of several issues, the authors conclude that for certain types of buildings and structures the time has come for the use of a formal risk-management approach, including probabilistic risk assessment methods, to help identify dominant risks to public health, safety, and security and to help manage these risks in a cost-effective manner.

  12. An agent based architecture for high-risk neonate management at neonatal intensive care unit.

    Science.gov (United States)

    Malak, Jaleh Shoshtarian; Safdari, Reza; Zeraati, Hojjat; Nayeri, Fatemeh Sadat; Mohammadzadeh, Niloofar; Farajollah, Seide Sedighe Seied

    2018-01-01

    In recent years, the use of new tools and technologies has decreased the neonatal mortality rate. Despite the positive effect of using these technologies, the decisions are complex and uncertain in critical conditions when the neonate is preterm or has a low birth weight or malformations. There is a need to automate the high-risk neonate management process by creating real-time and more precise decision support tools. To create a collaborative and real-time environment to manage neonates with critical conditions at the NICU (Neonatal Intensive Care Unit) and to overcome high-risk neonate management weaknesses by applying a multi agent based analysis and design methodology as a new solution for NICU management. This study was a basic research for medical informatics method development that was carried out in 2017. The requirement analysis was done by reviewing articles on NICU Decision Support Systems. PubMed, Science Direct, and IEEE databases were searched. Only English articles published after 1990 were included; also, a needs assessment was done by reviewing the extracted features and current processes at the NICU environment where the research was conducted. We analyzed the requirements and identified the main system roles (agents) and interactions by a comparative study of existing NICU decision support systems. The Universal Multi Agent Platform (UMAP) was applied to implement a prototype of our multi agent based high-risk neonate management architecture. Local environment agents interacted inside a container and each container interacted with external resources, including other NICU systems and consultation centers. In the NICU container, the main identified agents were reception, monitoring, NICU registry, and outcome prediction, which interacted with human agents including nurses and physicians. Managing patients at the NICU units requires online data collection, real-time collaboration, and management of many components. Multi agent systems are applied as

  13. FlySec: a risk-based airport security management system based on security as a service concept

    Science.gov (United States)

    Kyriazanos, Dimitris M.; Segou, Olga E.; Zalonis, Andreas; Thomopoulos, Stelios C. A.

    2016-05-01

    Complementing the ACI/IATA efforts, the FLYSEC European H2020 Research and Innovation project (http://www.fly-sec.eu/) aims to develop and demonstrate an innovative, integrated and end-to-end airport security process for passengers, enabling a guided and streamlined procedure from the landside to airside and into the boarding gates, and offering for an operationally validated innovative concept for end-to-end aviation security. FLYSEC ambition turns through a well-structured work plan into: (i) innovative processes facilitating risk-based screening; (ii) deployment and integration of new technologies and repurposing existing solutions towards a risk-based Security paradigm shift; (iii) improvement of passenger facilitation and customer service, bringing security as a real service in the airport of tomorrow;(iv) achievement of measurable throughput improvement and a whole new level of Quality of Service; and (v) validation of the results through advanced "in-vitro" simulation and "in-vivo" pilots. On the technical side, FLYSEC achieves its ambitious goals by integrating new technologies on video surveillance, intelligent remote image processing and biometrics combined with big data analysis, open-source intelligence and crowdsourcing. Repurposing existing technologies is also in the FLYSEC objectives, such as mobile application technologies for improved passenger experience and positive boarding applications (i.e. services to facilitate boarding and landside/airside way finding) as well as RFID for carry-on luggage tracking and quick unattended luggage handling. In this paper, the authors will describe the risk based airport security management system which powers FLYSEC intelligence and serves as the backend on top of which FLYSEC's front end technologies reside for security services management, behaviour and risk analysis.

  14. Risk based knowledge assessments: towards a toolbox for managing key knowledge assets

    International Nuclear Information System (INIS)

    Bright, Clive

    2008-01-01

    Full text: It is now well acknowledged that considerable Knowledge Management (KM) issues are faced by national and international nuclear communities. Much of these problems relate to issues of an ageing workforce and the significantly reduced influx of new generation of nuclear engineers and scientists. The management discipline of KM contains a broad spectrum of methods and techniques. However, the effective implementation of a KM strategy requires the selection and deployment of appropriate and targeted approaches that are pertinent to the particular issues of the technical or business area within an organisation. A clear strategy is contingent upon an assessment of what are the knowledge areas and what are the key (knowledge) risk areas. In particular the following issues have to be addressed: 'what knowledge exists?', 'what is the nature and format of that knowledge?' and 'what knowledge is key to our continued, safe, and effective operation?'. Answers to such questions will enable an organisation to prioritise KM effort and employ subsequent KM approaches that are appropriate. Subsequent approaches ranging from the utilisation of information technologies, such as databases; knowledge retention methods; and the setting up of Community of Practices to share knowledge and experience. This paper considers a risk assessment based approach to KM. In so doing the paper extends work previously reported on an approach to conducting knowledge audits by considering the integration of that approach with approaches to (knowledge) risk assessment. The paper also provides a brief review of the various KM approaches that can act to reduce the level of risk faced by an organisation. The paper concludes by reflecting upon the role, value of deploying such a risk based approach. (author)

  15. Research on Risk Management and Power Supplying Enterprise Control

    Science.gov (United States)

    Shen, Jianfei; Wang, Yige

    2017-09-01

    This paper derived from the background that electric power enterprises strengthen their risk management under requirements of the government. For the power industry, we explained the risk management theory, analysed current macro environment as well as basic situation, then classified and interpreted the main risks. In a case study on a power bureau, we established a risk management system based on deep understanding about the characteristics of its organization system and risk management function. Then, we focused on risks in operation as well as incorrupt government construction to give a more effective framework of the risk management system. Finally, we came up with the problems and specific countermeasures in risk management, which provided a reference for other electric power enterprises.

  16. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  17. Risk based modelling

    International Nuclear Information System (INIS)

    Chapman, O.J.V.; Baker, A.E.

    1993-01-01

    Risk based analysis is a tool becoming available to both engineers and managers to aid decision making concerning plant matters such as In-Service Inspection (ISI). In order to develop a risk based method, some form of Structural Reliability Risk Assessment (SRRA) needs to be performed to provide a probability of failure ranking for all sites around the plant. A Probabilistic Risk Assessment (PRA) can then be carried out to combine these possible events with the capability of plant safety systems and procedures, to establish the consequences of failure for the sites. In this way the probability of failures are converted into a risk based ranking which can be used to assist the process of deciding which sites should be included in an ISI programme. This paper reviews the technique and typical results of a risk based ranking assessment carried out for nuclear power plant pipework. (author)

  18. Managing the risks of disease transmission through trade: a commodities-based approach?

    Science.gov (United States)

    Brückner, G K

    2011-04-01

    Since its founding in 1924, the World Organisation for Animal Health (OIE) has facilitated safe trade in animals and animal products by developing effective standards to prevent the spread of animal diseases across the globe. A protocol for recognising the disease-free status of countries is an integral part of this process and has been adopted and advanced through the years to assist OIE Member Countries in placing disease-free animals and their products on the international market. Options such as trade from disease-free zones and disease-free compartments are now available to Members and have proven to be a positive mechanism for facilitating trade. A further option is trading in safe commodities, i.e. animals and animal products that have been identified as safe to trade even in the presence of disease, either with or without applying risk mitigation measures before export. Although most Members have incorporated the acceptance of disease-free countries or zones into their animal health policies and sanitary measures, there still appears to be a reluctance to trade in commodities from infected countries, despite clear, scientifically based risk management standards that can be applied if needed. This paper offers some examples reflecting the apparent reluctance to trade in commodities and discusses how the standards in the OIE's Terrestrial Animal Health Code could be used to apply scientifically based risk management practices to review outdated policies.

  19. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  20. A Semi Risk-Based Approach for Managing Urban Drainage Systems under Extreme Rainfall

    Directory of Open Access Journals (Sweden)

    Carlos Salinas-Rodriguez

    2018-03-01

    Full Text Available Conventional design standards for urban drainage systems are not set to deal with extreme rainfall events. As these events are becoming more frequent, there is room for proposing new planning approaches and standards that are flexible enough to cope with a wide range of rainfall events. In this paper, a semi risk-based approach is presented as a simple and practical way for the analysis and management of rainfall flooding at the precinct scale. This approach uses various rainfall events as input parameters for the analysis of the flood hazard and impacts, and categorises the flood risk in different levels, ranging from very low to very high risk. When visualised on a map, the insight into the risk levels across the precinct will enable engineers and spatial planners to identify and prioritise interventions to manage the flood risk. The approach is demonstrated for a sewer district in the city of Rotterdam, the Netherlands, using a one-dimensional (1D/two-dimensional (2D flood model. The risk level of this area is classified as being predominantly very low or low, with a couple of locations with high and very high risk. For these locations interventions, such as disconnection and lowering street profiles, have been proposed and analysed with the 1D/2D flood model. The interventions were shown to be effective in reducing the risk levels from very high/high risk to medium/low risk.

  1. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  2. Mental Health Professionals' Suicide Risk Assessment and Management Practices.

    Science.gov (United States)

    Roush, Jared F; Brown, Sarah L; Jahn, Danielle R; Mitchell, Sean M; Taylor, Nathanael J; Quinnett, Paul; Ries, Richard

    2018-01-01

    Approximately 20% of suicide decedents have had contact with a mental health professional within 1 month prior to their death, and the majority of mental health professionals have treated suicidal individuals. Despite limited evidence-based training, mental health professionals make important clinical decisions related to suicide risk assessment and management. The current study aimed to determine the frequency of suicide risk assessment and management practices and the association between fear of suicide-related outcomes or comfort working with suicidal individuals and adequacy of suicide risk management decisions among mental health professionals. Mental health professionals completed self-report assessments of fear, comfort, and suicide risk assessment and management practices. Approximately one third of mental health professionals did not ask every patient about current or previous suicidal thoughts or behaviors. Further, comfort, but not fear, was positively associated with greater odds of conducting evidence-based suicide risk assessments at first appointments and adequacy of suicide risk management practices with patients reporting suicide ideation and a recent suicide attempt. The study utilized a cross-sectional design and self-report questionnaires. Although the majority of mental health professionals report using evidenced-based practices, there appears to be variability in utilization of evidence-based practices.

  3. Methodology of environmental risk assessment management

    Directory of Open Access Journals (Sweden)

    Saša T. Bakrač

    2012-04-01

    Full Text Available Successful protection of environment is mostly based on high-quality assessment of potential and present risks. Environmental risk management is a complex process which includes: identification, assessment and control of risk, namely taking measures in order to minimize the risk to an acceptable level. Environmental risk management methodology: In addition to these phases in the management of environmental risk, appropriate measures that affect the reduction of risk occurrence should be implemented: - normative and legal regulations (laws and regulations, - appropriate organizational structures in society, and - establishing quality monitoring of environment. The emphasis is placed on the application of assessment methodologies (three-model concept, as the most important aspect of successful management of environmental risk. Risk assessment methodology - European concept: The first concept of ecological risk assessment methodology is based on the so-called European model-concept. In order to better understand this ecological risk assessment methodology, two concepts - hazard and risk - are introduced. The European concept of environmental risk assessment has the following phases in its implementation: identification of hazard (danger, identification of consequences (if there is hazard, estimate of the scale of consequences, estimate of consequence probability and risk assessment (also called risk characterization. The European concept is often used to assess risk in the environment as a model for addressing the distribution of stressors along the source - path - receptor line. Risk assessment methodology - Canadian concept: The second concept of the methodology of environmental risk assessment is based on the so-called Canadian model-concept. The assessment of ecological risk includes risk arising from natural events (floods, extreme weather conditions, etc., technological processes and products, agents (chemical, biological, radiological, etc

  4. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  5. Interest Rate Risk Management using Duration Gap Methodology

    Directory of Open Access Journals (Sweden)

    Dan Armeanu

    2008-01-01

    Full Text Available The world for financial institutions has changed during the last 20 years, and become riskier and more competitive-driven. After the deregulation of the financial market, banks had to take on extensive risk in order to earn sufficient returns. Interest rate volatility has increased dramatically over the past twenty-five years and for that an efficient management of this interest rate risk is strong required. In the last years banks developed a variety of methods for measuring and managing interest rate risk. From these the most frequently used in real banking life and recommended by Basel Committee are based on: Reprising Model or Funding Gap Model, Maturity Gap Model, Duration Gap Model, Static and Dynamic Simulation. The purpose of this article is to give a good understanding of duration gap model used for managing interest rate risk. The article starts with a overview of interest rate risk and explain how this type of risk should be measured and managed within an asset-liability management. Then the articles takes a short look at methods for measuring interest rate risk and after that explains and demonstrates how can be used Duration Gap Model for managing interest rate risk in banks.The world for financial institutions has changed during the last 20 years, and become riskier and more competitive-driven. After the deregulation of the financial market, banks had to take on extensive risk in order to earn sufficient returns. Interest rate volatility has increased dramatically over the past twenty-five years and for that an efficient management of this interest rate risk is strong required. In the last years banks developed a variety of methods for measuring and managing interest rate risk. From these the most frequently used in real banking life and recommended by Basel Committee are based on: Reprising Model or Funding Gap Model, Maturity Gap Model, Duration Gap Model, Static and Dynamic Simulation. The purpose of this article is to give a

  6. Prototype of a Web-based Participative Decision Support Platform in Natural Hazards and Risk Management

    Directory of Open Access Journals (Sweden)

    Zar Chi Aye

    2015-07-01

    Full Text Available This paper presents the current state and development of a prototype web-GIS (Geographic Information System decision support platform intended for application in natural hazards and risk management, mainly for floods and landslides. This web platform uses open-source geospatial software and technologies, particularly the Boundless (formerly OpenGeo framework and its client side software development kit (SDK. The main purpose of the platform is to assist the experts and stakeholders in the decision-making process for evaluation and selection of different risk management strategies through an interactive participation approach, integrating web-GIS interface with decision support tool based on a compromise programming approach. The access rights and functionality of the platform are varied depending on the roles and responsibilities of stakeholders in managing the risk. The application of the prototype platform is demonstrated based on an example case study site: Malborghetto Valbruna municipality of North-Eastern Italy where flash floods and landslides are frequent with major events having occurred in 2003. The preliminary feedback collected from the stakeholders in the region is discussed to understand the perspectives of stakeholders on the proposed prototype platform.

  7. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  8. Research on Knowledge-Oriented Supply ChainRisk Management System Model

    OpenAIRE

    Yingchun Guo

    2011-01-01

    Based on analyzing the characteristics of supply chain risk management under the influences of knowledge, in this paper integrates basic theories and methods of knowledge management into the process of risk management, builds a knowledge-oriented supply chain risk management system model, and proposes relevant strategies, presenting references for practical application of knowledge-oriented supply chain risk management. By means of acquiring, storing, sharing, and transferring supply chain ri...

  9. Risk preferences, probability weighting, and strategy tradeoffs in wildfire management

    Science.gov (United States)

    Michael S. Hand; Matthew J. Wibbenmeyer; Dave Calkin; Matthew P. Thompson

    2015-01-01

    Wildfires present a complex applied risk management environment, but relatively little attention has been paid to behavioral and cognitive responses to risk among public agency wildfire managers. This study investigates responses to risk, including probability weighting and risk aversion, in a wildfire management context using a survey-based experiment administered to...

  10. Critical infrastructure cyber-security risk management

    OpenAIRE

    Spyridopoulos, T.; Maraslis, K.; Tryfonas, T.; Oikonomou, G.

    2017-01-01

    Traditional IT cyber-security risk management methods are based on the evaluation of risks calculated as the likelihood of cyber-security incidents occurring. However, these probabilities are usually estimations or guesses based on past experience and incomplete data. Incorrect estimations can lead to errors in the evaluation of risks that can ultimately affect the protection of the system. This issue is also transferred to methods used in Industrial Control Systems (ICSs), as they are mainly...

  11. Risk management in a competitive electricity market

    International Nuclear Information System (INIS)

    Liu, Min; Wu, Felix F.

    2007-01-01

    In a competitive electricity market, it is necessary and important to develop an appropriate risk management scheme for trade with full utilization of the multi-market environment in order to maximize participants' benefits and minimize the corresponding risks. Based on the analyses to trading environments and risks in the electricity market, a layered framework of risk management for electric energy trading is proposed in this paper. Simulation results confirmed that trading among multiple markets is helpful to reduce the complete risk, and VaR provides a useful approach to judge whether the formed risk-control scheme is acceptable. (author)

  12. Agricultural risk management

    DEFF Research Database (Denmark)

    Lund, Mogens; Oksen, Arne; Larsen, Torben U.

    2005-01-01

    A new model for risk management in agriculture is described in the paper. The risk model is constructed as a context dependent process, which includes four main phases. The model is aimed at agricultural advisors, who wish to facilitate and disseminate risk management to farmers. It is developed...... and tested by an action research approach in an attempt to make risk management more applicable on family farms. Our obtained experiences indicate that farmers don’t apply probabilistic thinking and other concepts according to formal decision theory....

  13. A model for the optimal risk management of (farm) firms

    DEFF Research Database (Denmark)

    Rasmussen, Svend

    Current methods of risk management focus on efficiency and do not provide operational answers to the basic question of how to optimise and balance the two objectives, maximisation of expected income and minimisation of risk. This paper uses the Capital Asset Pricing Model (CAPM) to derive...... an operational criterion for the optimal risk management of firms. The criterion assumes that the objective of the firm manager is to maximise the market value of the firm and is based on the condition that the application of risk management tools has a symmetric effect on the variability of income around...... the mean. The criterion is based on the expected consequences of risk management on relative changes in the variance of return on equity and expected income. The paper demonstrates how the criterion may be used to evaluate and compare the effect of different risk management tools, and it illustrates how...

  14. An optimization-based approach for facility energy management with uncertainties, and, Power portfolio optimization in deregulated electricity markets with risk management

    Science.gov (United States)

    Xu, Jun

    Topic 1. An Optimization-Based Approach for Facility Energy Management with Uncertainties. Effective energy management for facilities is becoming increasingly important in view of the rising energy costs, the government mandate on the reduction of energy consumption, and the human comfort requirements. This part of dissertation presents a daily energy management formulation and the corresponding solution methodology for HVAC systems. The problem is to minimize the energy and demand costs through the control of HVAC units while satisfying human comfort, system dynamics, load limit constraints, and other requirements. The problem is difficult in view of the fact that the system is nonlinear, time-varying, building-dependent, and uncertain; and that the direct control of a large number of HVAC components is difficult. In this work, HVAC setpoints are the control variables developed on top of a Direct Digital Control (DDC) system. A method that combines Lagrangian relaxation, neural networks, stochastic dynamic programming, and heuristics is developed to predict the system dynamics and uncontrollable load, and to optimize the setpoints. Numerical testing and prototype implementation results show that our method can effectively reduce total costs, manage uncertainties, and shed the load, is computationally efficient. Furthermore, it is significantly better than existing methods. Topic 2. Power Portfolio Optimization in Deregulated Electricity Markets with Risk Management. In a deregulated electric power system, multiple markets of different time scales exist with various power supply instruments. A load serving entity (LSE) has multiple choices from these instruments to meet its load obligations. In view of the large amount of power involved, the complex market structure, risks in such volatile markets, stringent constraints to be satisfied, and the long time horizon, a power portfolio optimization problem is of critical importance but difficulty for an LSE to serve the

  15. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  16. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  17. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book...... is framed around the challenges imposed on executives and directors in dealing with an increasingly complex and unpredictable world. This requires a new risk leadership focus that not only avoids the downside risks but also considers ways to exploit the upside potential offered by a dynamic environment...

  18. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  19. Commodity risk management

    Directory of Open Access Journals (Sweden)

    Hilary Till

    2016-09-01

    Full Text Available This article discusses the practical issues involved in applying a disciplined risk management methodology to commodity futures trading. Accordingly, the paper shows how to apply methodologies derived from both conventional asset management and hedge fund management to futures trading. The article also discusses some of the risk management issues that are unique to leveraged futures trading.

  20. Risk Management of Large RC Structures within Spatial Information System

    DEFF Research Database (Denmark)

    Qin, Jianjun; Faber, Michael Havbro

    2012-01-01

    Abstract: The present article addresses the development of a spatial information system (SIS), which aims to facilitate risk management of large‐scale concrete structures. The formulation of the SIS is based on ideas developed in the context of indicator‐based risk modeling for concrete structures...... subject to corrosion and geographical information system based risk modeling concerning large‐scale risk management. The term “risk management” here refers in particular to the process of condition assessment and optimization of the inspection and repair activities. The SIS facilitates the storage...... and handling of all relevant information to the risk management. The probabilistic modeling utilized in the condition assessment takes basis in a Bayesian hierarchical modeling philosophy. It facilitates the updating of risks as well as optimizing inspection plans whenever new information about the condition...

  1. A Risk-Based Interval Two-Stage Programming Model for Agricultural System Management under Uncertainty

    Directory of Open Access Journals (Sweden)

    Ye Xu

    2016-01-01

    Full Text Available Nonpoint source (NPS pollution caused by agricultural activities is main reason that water quality in watershed becomes worse, even leading to deterioration. Moreover, pollution control is accompanied with revenue’s fall for agricultural system. How to design and generate a cost-effective and environmentally friendly agricultural production pattern is a critical issue for local managers. In this study, a risk-based interval two-stage programming model (RBITSP was developed. Compared to general ITSP model, significant contribution made by RBITSP model was that it emphasized importance of financial risk under various probabilistic levels, rather than only being concentrated on expected economic benefit, where risk is expressed as the probability of not meeting target profit under each individual scenario realization. This way effectively avoided solutions’ inaccuracy caused by traditional expected objective function and generated a variety of solutions through adjusting weight coefficients, which reflected trade-off between system economy and reliability. A case study of agricultural production management with the Tai Lake watershed was used to demonstrate superiority of proposed model. Obtained results could be a base for designing land-structure adjustment patterns and farmland retirement schemes and realizing balance of system benefit, system-failure risk, and water-body protection.

  2. Practical Methods for Information Security Risk Management

    Directory of Open Access Journals (Sweden)

    Cristian AMANCEI

    2011-01-01

    Full Text Available The purpose of this paper is to present some directions to perform the risk man-agement for information security. The article follows to practical methods through question-naire that asses the internal control, and through evaluation based on existing controls as part of vulnerability assessment. The methods presented contains all the key elements that concurs in risk management, through the elements proposed for evaluation questionnaire, list of threats, resource classification and evaluation, correlation between risks and controls and residual risk computation.

  3. Internal Audit and Risk Management

    OpenAIRE

    Constantin Nicolae Vasile; Alexandru Georgiana

    2011-01-01

    Internal audit and risk management have the same goal: the control of risk. There are various roles for the internal audit in respect of risk management. The main limitations of internal audit in respect of risk management regards assuming risk management tasks. One of the main issues regarding risk management is to make sure that the key risks are taken into consideration and that the management and the board of the organization take action as needed. Internal audit could give advice to mana...

  4. Sustainable flood risk management – What is sustainable?

    DEFF Research Database (Denmark)

    Sørup, Hjalte Jomo Danielsen; Brudler, Sarah; Lerer, Sara Maria

    2016-01-01

    Sustainable flood risk management has to be achieved since flood protection is a fundamental societal service that we must deliver. Based on the discourse within the fields of risk management and sustainable urban water management, we discuss the necessity of assessing the sustainability of flood...... risk management, and propose an evaluation framework for doing so. We argue that it is necessary to include quantitative sustainability measures in flood risk management in order to exclude unsustainable solutions. Furthermore, we use the concept of absolute sustainability to discuss the prospects...... of maintaining current service levels without compromising future generation’s entitlement of services. Discussions on the sustainability of different overall flood risk schemes must take place. Fundamental changes in the approaches will require fundamental changes in the mind-sets of practitioners as well...

  5. Risk management guide

    International Nuclear Information System (INIS)

    Briscoe, G.J.

    1977-06-01

    Risk management requires an assessment or a knowledge of risk. This, in turn, requires identification of hazards (sources of risk) and a determination of risk (evaluation of the hazard degree). The hazard identification and risk analysis techniques presented in this Guide are, in general, based on the MORT concept that accidents result from unwanted energy flow in the absence of adequate controls and/or barriers. This Guide presents an analytical tree designed to prevent oversight of specific energy sources in risk identification. Hazard identification by field personnel is also discussed. Quantitative risk analysis is discussed in the following section. A method for summary of the risks for each energy classification is given. This method uses a graphical log-normal projection so that low probability events, which are not adequately represented in the experience data, are included in the risk assessment. This permits a more acceptable risk assessment since catastrophes are not ignored, even though the actual risk is only approximated. In addition, a few examples of risk analysis of specific hazards are given. Rudimentary probability and fault tree theory are used in these examples. Total risk assessment and resource allocation and safety performance trend analysis are discussed

  6. Hog Producers' Risk Management Attitudes and Desire for Additional Risk Management Education

    OpenAIRE

    Patrick, George F.; Peiter, Amy J.; Knight, Thomas O.; Coble, Keith H.; Baquet, Alan E.

    2007-01-01

    Hog producers in Indiana and Nebraska were surveyed about sources of risk, effectiveness of risk management strategies, and prior participation in and desire for additional risk management education. Ownership of hogs by the producer, size of the operation, and age did have significant effects on ratings of both sources of risk and effectiveness of risk management strategies. Probit analysis found age, prior attendance, knowledge and prior use of the tool, level of integration, and concern ab...

  7. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  8. A decision‐making framework for flood risk management based on a Bayesian Influence Diagram

    DEFF Research Database (Denmark)

    Åstrøm, Helena Lisa Alexandra; Madsen, Henrik; Friis-Hansen, Peter

    2014-01-01

    We develop a Bayesian Influence Diagram (ID) approach for risk‐based decision‐ making in flood management. We show that it is a flexible decision‐making tool to assess flood risk in a non‐stationary environment and with an ability to test different adaptation measures in order to agree on the best...... means to describe uncertainty in the system. Hence, an ID contributes with several advantages in risk assessment and decision‐making. We present an ID approach for risk‐ based decision‐making in which we improve conventional flood risk assessments by including several types of hazards...... measures and combinations of these. Adaptation options can be tested at different points in time (in different time slices) which allows for finding the optimal time to invest. The usefulness of our decision‐making framework was exemplified through case studies in Aarhus and Copenhagen. Risk‐based decision‐making...

  9. Certification and risk management

    International Nuclear Information System (INIS)

    Villanueva Fernandez, M.

    2015-01-01

    Nowadays more organizations are increasingly aware of the importance of properly managing the uncertainty of its activities and build competitive advantages through the identification, assessment and management of risks that they face. Risk management is also an aspect of great importance within the new version of ISO fact it is one of the most innovative and also the most laborious, because an appropriate risk management achieves expected results and customer satisfaction. In conclusion, risk management is a new field of business and can be considered a cross-cutting component for other relevant factors of organizational change management. (Author)

  10. Evaluation of wholesale electric power market rules and financial risk management by agent-based simulations

    Science.gov (United States)

    Yu, Nanpeng

    As U.S. regional electricity markets continue to refine their market structures, designs and rules of operation in various ways, two critical issues are emerging. First, although much experience has been gained and costly and valuable lessons have been learned, there is still a lack of a systematic platform for evaluation of the impact of a new market design from both engineering and economic points of view. Second, the transition from a monopoly paradigm characterized by a guaranteed rate of return to a competitive market created various unfamiliar financial risks for various market participants, especially for the Investor Owned Utilities (IOUs) and Independent Power Producers (IPPs). This dissertation uses agent-based simulation methods to tackle the market rules evaluation and financial risk management problems. The California energy crisis in 2000-01 showed what could happen to an electricity market if it did not go through a comprehensive and rigorous testing before its implementation. Due to the complexity of the market structure, strategic interaction between the participants, and the underlying physics, it is difficult to fully evaluate the implications of potential changes to market rules. This dissertation presents a flexible and integrative method to assess market designs through agent-based simulations. Realistic simulation scenarios on a 225-bus system are constructed for evaluation of the proposed PJM-like market power mitigation rules of the California electricity market. Simulation results show that in the absence of market power mitigation, generation company (GenCo) agents facilitated by Q-learning are able to exploit the market flaws and make significantly higher profits relative to the competitive benchmark. The incorporation of PJM-like local market power mitigation rules is shown to be effective in suppressing the exercise of market power. The importance of financial risk management is exemplified by the recent financial crisis. In this

  11. Integrated Risk and Knowledge Management Program -- IRKM-P

    Science.gov (United States)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  12. Status and Challenges of Managing Risks in the U.S. Department of Energy Environmental Management Program

    International Nuclear Information System (INIS)

    Aaberg, Rosanne L.; Andrews, William B.; Bollinger, Mark E.; McGinn, Wilson; Picel, Kurt; Stenner, Robert D.; White, Michael K.; Young, Alvin L.

    2003-01-01

    Even in the United States, where various methods of risk assessment, risk management, and risk communication have been attempted over the years, these disciplines continue to evolve to meet the needs of decision makers faced with legacy wastes. This chapter provides an overview of the Cold War legacy challenges as currently understood by the U.S. Department of Energy (DOE), as well as the risk-based methodologies currently being applied to assist the DOE in managing those challenges. In the past decade (1990s), the DOE created a single organization within their waste management structure to coordinate their risk activities: the Office of Environmental Management's Center for Risk Excellence. The chapter describes the formation, operation, and contributions of that organization, which was created to encourage the use of risk-based approaches to DOE site management and to provide consistency in the use of such approaches across the DOE complex. Of particular interest are the effective communication concepts developed by this organization for summarizing site risk and risk-related information as risk profiles

  13. RISKS MANAGEMENT. A PROPENSITY SCORE APPLICATION

    Directory of Open Access Journals (Sweden)

    Constangioara Alexandru

    2008-05-01

    Full Text Available Risk management is relatively unexplored in Romania. Although Romanian specialists dwell on theoretical aspects such as the risks classification and the important distinction between risks and uncertainty the practical relevance of the matter is outside existing studies. Present paper uses a dataset of consumer data to build a propensity scorecard based on relevant quantitative modeling.

  14. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  15. Risk management in Takaful

    OpenAIRE

    Akhter, Waheed

    2010-01-01

    Risk management is of vital importance in Islam and Takāful provides a way to manage risks in business according to Sharī’ah principles. This research paper attempts to identify various types of risks involved in Takāful business that affect operational and investment functions of Takāful operators across the globe. It lays down criteria for Takāful operator to manage those risks effectively. However, Takāful operators often face difficulty in managing market and credit risks as Sharī’ah comp...

  16. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  17. Managing the risks of risk management on large fires

    Science.gov (United States)

    Donald G. MacGregor; Armando González-Cabán

    2013-01-01

    Large fires pose risks to a number of important values, including the ecology, property and the lives of incident responders. A relatively unstudied aspect of fire management is the risks to which incident managers are exposed due to organizational and sociopolitical factors that put them in a position of, for example, potential liability or degradation of their image...

  18. Risk management in customs control

    OpenAIRE

    Drobot, Elena; Klevleeva, Aziza

    2016-01-01

    The particularities of risk-management system implementation within customs control are discussed in the article. The authors single out the elements of risk-management system, evaluate effectiveness of risk-management in customs control. The main reasons for non-implementation of risk-management system in customs control are described, as well. Particular attention is paid to the benefits of customs risk management.

  19. Virtual Enterprise Risk Management Using Artificial Intelligence

    Directory of Open Access Journals (Sweden)

    Hanning Chen

    2010-01-01

    Full Text Available Virtual enterprise (VE has to manage its risk effectively in order to guarantee the profit. However, restricting the risk in a VE to the acceptable level is considered difficult due to the agility and diversity of its distributed characteristics. First, in this paper, an optimization model for VE risk management based on distributed decision making model is introduced. This optimization model has two levels, namely, the top model and the base model, which describe the decision processes of the owner and the partners of the VE, respectively. In order to solve the proposed model effectively, this work then applies two powerful artificial intelligence optimization techniques known as evolutionary algorithms (EA and swarm intelligence (SI. Experiments present comparative studies on the VE risk management problem for one EA and three state-of-the-art SI algorithms. All of the algorithms are evaluated against a test scenario, in which the VE is constructed by one owner and different partners. The simulation results show that the PS2O algorithm, which is a recently developed SI paradigm simulating symbiotic coevolution behavior in nature, obtains the superior solution for VE risk management problem than the other algorithms in terms of optimization accuracy and computation robustness.

  20. Financial Risk Management

    OpenAIRE

    Catalin-Florinel Stanescu; Laurentiu Mircea Simion

    2011-01-01

    Concerns about the financial risk is increasing. In this climate, companies of all types and sizes want a robust framework for financial risk management to meet compliance requirements, contribute to better decision making and increase performance. Financial risk management professionals working with financial institutions and other corporate clients to achieve these objectives.

  1. Risk management and safety

    International Nuclear Information System (INIS)

    Niehaus, F.; Novegno, A.

    1985-01-01

    Risk assessment, including probabilistic analyses, has made great progress over the past decade. In spite of the inherent uncertainties it has now become possible to utilize methods and results for decision making at various levels. This paper will, therefore, review risk management in industrial installations, risk management for energy safety policy and prospects of risk management in highly industrialized areas. (orig.) [de

  2. MANAGEMENT OF RISKS BASED ON INTERACTION BETWEEN CONSTRUCTION EXPERT AND CUSTOMER ORGANIZATION

    Directory of Open Access Journals (Sweden)

    Александр Васильевич Харитонович

    2016-02-01

    Full Text Available The paper describes problems connected to management of risk and key characteristics of interaction of construction expert and organization-customer of expert services. We have conducted the analysis of different schemes used for management of risk, their advantages and disadvantages. In addition authors describe the main opportunities that appear in the organization as a result of the systematic engagement of an external expert at different stages of investment and construction project (getting recommendations aimed at improving of the organization adaptability to changes and risks; improving the efficiency of management of investment and construction projects etc..

  3. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  4. Self-management of vascular risk factors

    NARCIS (Netherlands)

    Sol-de Rijk, B.G.M.

    2009-01-01

    Summary The aim of this thesis was to provide insight into the potential of a self-management approach in treatment of vascular risk factors and to develop a self-management intervention. Furthermore to examine if this intervention, based on self-efficacy promoting theory, is effective in reducing

  5. Improvement of Internal Audit Planning Method through Application of Risk Card by the Indices of Value-Based Management System of Joint-Stock Company

    OpenAIRE

    Oleksandr Smetanko

    2014-01-01

    The Article deals with issues of improving methods of planning and carrying out internal audit in conditions of risk-oriented approach to audit according to the indices of value-based management system - VBM (Value Based Management) using the risk card (risk matrix). A risk card (risk matrix) method has been disclosed taking into account risk level of each of the key factors influencing joint-stock company value rates. Recommendations have been given and abstract of working document has been ...

  6. Insights from implementation of a risk management methodology

    International Nuclear Information System (INIS)

    Mahn, J.A.; Germann, R.P.; Jacobs, R.R.

    1992-01-01

    In 1988, GPU Nuclear (GPUN) Corporation embarked on a research effort to identify or develop an appropriate methodology for proactively managing risks. The objective of this effort was to increase its ability to identify potential risks and to aid resource allocation decision making for risk control. Such a methodology was presented at a risk management symposium sponsored by GPUN in September of 1989. A pilot project based on this methodology has been conducted at GPUN to test and validate the elements of the methodology and to compare the results of its application with current corporate methods for guiding risk decision making. The pilot project also led to a follow-up policy-capturing study to elicit information about the various risk decision-making models of GPUN decision makers. The combination of these endeavors provided an opportunity to gain numerous insights with respect to understanding the real value of a risk management process, obtaining acceptance of and commitment to risk management and improving operational aspects of the methodology

  7. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, Jeffrey H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2010-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  8. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, J.H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2009-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project

  9. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  10. Improving Operational Risk Management Using Business Performance Management Technologies

    OpenAIRE

    Bram Pieket Weeserik; Marco Spruit

    2018-01-01

    Operational Risk Management (ORM) comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM) technologies are believed to provide a solution for effective Operational Risk Management by offering several combined ...

  11. Risk Management Issues - An Aerospace Perspective

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  12. Scenario logic and probabilistic management of risk in business and engineering

    CERN Document Server

    Solojentsev, E D

    2005-01-01

    In this volume the methodological aspects of the scenario logic and probabilistic (LP) non-success risk management are considered. The theoretical bases of scenario non-success risk LP-management in business and engineering are also stated. Methods and algorithms for the scenario risk LP-management in problems of classification, investment and effectiveness are described. Risk LP- models and results of numerical investigations for credit risks, risk of frauds, security portfolio risk, risk of quality, accuracy, and risk in multi-stage systems reliability are given. In addition, a rather large number of new problems of estimation, analysis and management of risk are considered. Software for risk problems based on LP-methods, LP-theory, and GIE are described too. Audience This volume is intended for experts and scientists in the area of the risk in business and engineering, in problems of classification, investment and effectiveness, and post-graduates in those subject areas.

  13. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  14. THE MANAGEMENT OF CREDIT RISK ACCORDING TO INTERNAL RATINGS- BASED APPROACH

    Directory of Open Access Journals (Sweden)

    BOLOCAN DRAGOS-MIHAIL

    2010-12-01

    Full Text Available The internal ratings based approach (IRB Approach was created as part of Basel II replacing the original Basle Accord of 1988 (Basle I in an effort to create a better framework for regulating bank capital. This paper covers the methodology and components of the IRB Approach used to determine capital requirements for credit risk. Such an approach, which relies heavily upon a banks internal assessment of its counterparties and exposures, can secure two key objectives consistent with those which support the wider review of The New Basel Capital Accord.. IRB approach should promote safety and soundness in the financial system and, consistent with providing incentive compatibility, that the structure and requirements of the IRB approach do not impinge upon or undermine banks well-established lending and credit risk management practices

  15. RISK MANAGEMENT IN CUSTOMS CONTROL

    Directory of Open Access Journals (Sweden)

    Elena Valerievna Drobot

    2017-06-01

    Full Text Available Customs administrations operating in the modern global economy are faced with a complex range of challenges. The prime responsibilities remain the collection of revenues and the protection of the society, but these demanding tasks must be performed effectively and efficiently, whilst at the same time facilitating the flow of legitimate goods. Risk management is a logical and systematic method of identifying, analyzing and managing risks. Risk management can be associated with any activity, function or process within the organization and will enable the organization to take advantage of opportunities and minimize potential losses. Minimization of the human factor in customs control through the implementation of non-intrusive inspection equipment can be very useful. The particularities of risk-management system (RMS implementation within customs control are discussed in the article. The authors single out the elements of the risk-management system, evaluate the effectiveness of risk-management in customs control. The main reasons for non-implementation of the risk-management system in customs control are described as well. The particular attention is paid to the benefits of customs risk management. The authors’ hypothesis is that risk management in customs control must find a balance between costs and benefits to address all risks equally. Criteria are needed to decide what constitutes an acceptable or unacceptable risk. Thus, system analysis and risk management system are the effective mechanisms for acceleration of customs clearance and improve the quality of customs control. As a conclusion, the authors give recommendations for the improvement of the effectiveness of risk management system in customs control.

  16. Risk assessment and model for community-based construction ...

    African Journals Online (AJOL)

    It, therefore, becomes necessary to systematically manage uncertainty in community-based construction in order to increase the likelihood of meeting project objectives using necessary risk management strategies. Risk management, which is an iterative process due to the dynamic nature of many risks, follows three main ...

  17. Development of component reliability data for PSA and risk based management in Japan

    International Nuclear Information System (INIS)

    Yoshihiro Tomioka; Mitsumasa Hirano; Shunsuke Kondo

    1997-01-01

    The author presents the outline of development of the component reliability data for PSA and risk based management in Japan. In the first part following the introduction, the development process is described. The next part describes issues discussed in the course of the development, which are treatment of zero failure data, error factor, estimation of unavailable failure rate and integral test

  18. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  19. Risk Management for e-Business

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of a IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted software.

  20. How Can Every Organization Manage the Operational Risk?

    Directory of Open Access Journals (Sweden)

    Ferry Jie

    2002-03-01

    Full Text Available This article describe how every organization (generally and Australian Organizations (specifically can manage the operational risks.  Recently, the operational risks are the significant issues in every organization because every organization will suffer from poor operational performance due to risks, failure, and problems such as a number of losses which are likely to be made worse. Basically, the operational risk management process has five steps, identification, analysis, treatment, controlling, and communication/consulting. Generally, many organizations (in particularly in Australia and New Zealand have already used AS/NZS 4360-Risk Management System, AS/NZS 4801-Occupational Health and Safety Management System, ISO 14001: Effective Environmental Management System, ISO 9001: Quality Management System, AS/NZS 7799: Information Security Management, AS/NZS 3806: Compliance Management System for reducing/mitigating/managing the operational risks. Based on the SAI Certification Register, the number of Australian Organizations got the AS/NZS ISO 9000 series, AS/NZS 14000 series, AS/NZS 4801 and AS/NZS 7799.2:2000 Certifications are 3338, 30, 20 and 5 respectively. It can conclude that Australian Organizations prefer used AS/NZS ISO 9000 series rather than AS/NZS ISO 14000 series, AS/NZS 4801 and AS/NZS 7799.2:2000.

  1. Improving organisational resilience through enterprise security risk management.

    Science.gov (United States)

    Petruzzi, John; Loyear, Rachelle

    Enterprise Security Risk Management (ESRM) is a new philosophy and method of managing security programmes through the use of traditional risk principles. As a philosophy and life cycle, ESRM is focused on creating a business partnership between security practitioners and business leaders to more effectively provide protection against security risks in line with acceptable risk tolerances as defined by business asset owners and stakeholders. This paper explores the basics of the ESRM philosophy and life cycle and also shows how embracing the ESRM philosophy and implementing a risk-based security management model in the business organisation can lead to higher levels of organisational resilience as desired by organisation leaders, executives and the board of directors.

  2. Decisionmaking under risk in invasive species management: risk management theory and applications

    Science.gov (United States)

    Shefali V. Mehta; Robert G. Haight; Frances R. Homans

    2010-01-01

    Invasive species management is closely entwined with the assessment and management of risk that arises from the inherently random nature of the invasion process. The theory and application of risk management for invasive species with an economic perspective is reviewed in this synthesis. Invasive species management can be delineated into three general categories:...

  3. Safety risk management of underground engineering in China: Progress, challenges and strategies

    Directory of Open Access Journals (Sweden)

    Qihu Qian

    2016-08-01

    Full Text Available Underground construction in China is featured by large scale, high speed, long construction period, complex operation and frustrating situations regarding project safety. Various accidents have been reported from time to time, resulting in serious social impact and huge economic loss. This paper presents the main progress in the safety risk management of underground engineering in China over the last decade, i.e. (1 establishment of laws and regulations for safety risk management of underground engineering, (2 implementation of the safety risk management plan, (3 establishment of decision support system for risk management and early-warning based on information technology, and (4 strengthening the study on safety risk management, prediction and prevention. Based on the analysis of the typical accidents in China in the last decade, the new challenges in the safety risk management for underground engineering are identified as follows: (1 control of unsafe human behaviors; (2 technological innovation in safety risk management; and (3 design of safety risk management regulations. Finally, the strategies for safety risk management of underground engineering in China are proposed in six aspects, i.e. the safety risk management system and policy, law, administration, economy, education and technology.

  4. Enterprise risk management implementation : perceptions of risk practitioners in the South African mining industry

    OpenAIRE

    2013-01-01

    M.Comm. (Financial Economics) Enterprise risk management (ERM) is emerging as a risk management methodology that is seemingly superior to that of traditional, silo-based risk management. Although ERM implementation is on the increase, research into ERM is still limited. There is, for instance, a lack of clarity within the literature regarding which factors lead to companies embracing ERM, as well as a lack of consensus on ERM’s benefits. The purpose of this study was therefore to explore t...

  5. National Drought Policy: Shifting the Paradigm from Crisis to Risk-based Management

    Science.gov (United States)

    Wilhite, D. A.; Sivakumar, M. K.; Stefanski, R.

    2011-12-01

    Drought is a normal part of climate for virtually all of the world's climatic regimes. To better address the risks associated with this hazard and societal vulnerability, there must be a dramatic paradigm shift in our approach to drought management in the coming decade in the light of the increasing frequency of droughts and projections of increased severity and duration of these events in the future for many regions, especially in the developing world. Addressing this challenge will require an improved awareness of drought as a natural hazard, the establishment of integrated drought monitoring and early warning systems, a higher level of preparedness that fully incorporates risk-based management, and the adoption of national drought policies that are directed at increasing the coping capacity and resilience of populations to future drought episodes. The World Meteorological Organization (WMO), in partnership with other United Nations' agencies, the National Drought Mitigation Center at the University of Nebraska, NOAA, the U.S. Department of Agriculture, and other partners, is currently launching a program to organize a High Level Meeting on National Drought Policy (HMNDP) in March 2013 to encourage the development of national drought policies through the development of a compendium of key policy elements. The key objectives of a national drought policy are to: (1) encourage vulnerable economic sectors and population groups to adopt self-reliant measures that promote risk management; (2) promote sustainable use of the agricultural and natural resource base; and (3) facilitate early recovery from drought through actions consistent with national drought policy objectives. The key elements of a drought policy framework are policy and governance, including political will; addressing risk and improving early warnings, including vulnerability analysis, impact assessment, and communication; mitigation and preparedness, including the application of effective and

  6. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  7. Best practice vendor risk management in today's interconnected world.

    Science.gov (United States)

    Beale, Ian

    2017-01-01

    This paper explains why vendor/third-party risk is so important to all organisations, as well as the principal risks that organisations must consider. It describes the responsibility of management to manage these risks with support from risk experts at the selection phase and through the ongoing relationship. Different sources of information about the management of the key risks and alternative ways of collecting the data are evaluated. The paper concludes by discussing how both customer and supplier organisations benefit from a balanced approach to risk management. The approach described in the paper applies to organisations of all types and sizes and can be applied to varied supply chains. The data and insights are based on research conducted by CEB.

  8. THE MANAGEMENT OF RISKS IN BUSINESS AND IN THE MANAGEMENT OF HUMAN RESOURCES

    Directory of Open Access Journals (Sweden)

    Reta CONDEI

    2014-10-01

    Full Text Available The characteristics of market economy and coordinates of modern life have determinate both individual level and organizations increase of number of risk who can affect us, of their dimensions and of the consequences which induce them, but at the same time a highest need of firm security. In economic and financial department was develop an entire area –management risk and many financial instruments to reduce or diminish risk. The behaviour of economical agents respectively of the entrepreneurs and managers is different according to the risk in many respects: risk adversaries unaffected to risk and risk belovers who leave mark on decisions take it. Management risk is an cyclical process with distinct stages: risk identification, risk analyses and risk reactions. The management of this phenomenon goes from this context and the firm objectives, analyse the risk factors into a security conception having the purpose to minimize the risks and the cost. The policies of occupational safety and health at the level of the organization must include information regarding: the general security and health policy at work; the specific risks and the way of dealing with them; the responsibility of the managers in this field; the measures of implementation of these policies and must be based on: Employee safety is very important; Safety is prior to efficiency; Employee safety leads to advantages and efficiency; Respecting the regulations

  9. THE OPERATIONAL RISK MANAGEMENT IN THE ROMANIAN SMEs

    Directory of Open Access Journals (Sweden)

    Roxana Mironescu

    2015-07-01

    Full Text Available The prerequisite for the smooth functioning of the business risk management is the correct identification. Basically, identifying business risks is fundamental to determine the optimal level of protection for a given activity. If the risk is underestimated, the protection will be insufficient to cover losses and, if overstated, the cost of protection will reduce the excess proceeds of the activity. The objective of this research was to identify the internal and external major factors which influence the present activities and the future of the SMEs from the North East region The method used in this paper work is based on a questionnaire applied to a sample of 120 top managers coming from various fields of activity, operating on the market for more than two years. The management of information and the data collection was conducted in the late 2013. In the first stage, a total of 35 risks was identified. The further evaluation of the results used the probability and the impact of the identified risks, based on questionnaires and by processing information from the documentation provided by the managers of SMEs taken under the analysis.

  10. A model for the optimal risk management of farm firms

    DEFF Research Database (Denmark)

    Rasmussen, Svend

    2012-01-01

    Risk management is an integrated part of business or firm management and deals with the problem of how to avoid the risk of economic losses when the objective is to maximize expected profit. This paper will focus on the identification, assessment, and prioritization of risks in agriculture followed...... by a description of procedures for coordinated and economical application of resources to control the probability and/or impact of unfortunate events. Besides identifying the major risk factors and tools for risk management in agricultural production, the paper will look critically into the current methods...... for risk management Risk management is typically based on numerical analysis and the concept of efficiency. None of the methods developed so far actually solve the basic question of how the individual manager should behave so as to optimise the balance between expected profit/income and risk. In the paper...

  11. Issuance of Final Guidance: Ecological Risk Assessment and Risk Management Principles for Superfund Sites, October 7, 1999

    Science.gov (United States)

    This guidance is intended to help Superfund risk managers make ecological risk management decisions that are based on sound science, consistent across Regions, and present a characterization of site risks that is transparent to the public.

  12. Risk Management Challenges in Large-scale Energy PSS

    DEFF Research Database (Denmark)

    Tegeltija, Miroslava; Oehmen, Josef; Kozin, Igor

    2017-01-01

    Probabilistic risk management approaches have a long tradition in engineering. A large variety of tools and techniques based on the probabilistic view of risk is available and applied in PSS practice. However, uncertainties that arise due to lack of knowledge and information are still missing...... adequate representations. We focus on a large-scale energy company in Denmark as one case of current product/servicesystems risk management best practices. We analyze their risk management process and investigate the tools they use in order to support decision making processes within the company. First, we...... identify the following challenges in the current risk management practices that are in line with literature: (1) current methods are not appropriate for the situations dominated by weak knowledge and information; (2) quality of traditional models in such situations is open to debate; (3) quality of input...

  13. Intentional risk management through complex networks analysis

    CERN Document Server

    Chapela, Victor; Moral, Santiago; Romance, Miguel

    2015-01-01

    This book combines game theory and complex networks to examine intentional technological risk through modeling. As information security risks are in constant evolution,  the methodologies and tools to manage them must evolve to an ever-changing environment. A formal global methodology is explained  in this book, which is able to analyze risks in cyber security based on complex network models and ideas extracted from the Nash equilibrium. A risk management methodology for IT critical infrastructures is introduced which provides guidance and analysis on decision making models and real situations. This model manages the risk of succumbing to a digital attack and assesses an attack from the following three variables: income obtained, expense needed to carry out an attack, and the potential consequences for an attack. Graduate students and researchers interested in cyber security, complex network applications and intentional risk will find this book useful as it is filled with a number of models, methodologies a...

  14. Spatially-Aggregated Temperature Derivatives: Agricultural Risk Management in China

    Directory of Open Access Journals (Sweden)

    Lu Zong

    2016-09-01

    Full Text Available In this paper, a new form of weather derivative contract, namely the climatic zone-based growth degree-day (GDD contract, is introduced. The objective is to increase the risk management efficiency in the agricultural sector of China and to reduce the model dimension of multi-regional temperature-based weather derivatives pricing. Since the proposed contract serves as a risk management tool for all of the cities in the same climatic zone, we compare the risk hedging power between the climatic zone-based and the city-based GDD contracts. As a result, we find that the differences between the two types of temperature-based weather contracts are maintained within a certain range.

  15. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  16. Medical Assistant-based care management for high risk patients in small primary care practices

    DEFF Research Database (Denmark)

    Freund, Tobias; Peters-Klimm, Frank; Boyd, Cynthia M.

    2016-01-01

    Background: Patients with multiple chronic conditions are at high risk of potentially avoidable hospital admissions, which may be reduced by care coordination and self-management support. Medical assistants are an increasingly available resource for patient care in primary care practices. Objective......: To determine whether protocol-based care management delivered by medical assistants improves patient care in patients at high risk of future hospitalization in primary care. Design: Two-year cluster randomized clinical trial. Setting: 115 primary care practices in Germany. Patients: 2,076 patients with type 2......, and monitoring delivered by medical assistants with usual care. Measurements: All-cause hospitalizations at 12 months (primary outcome) and quality of life scores (Short Form 12 Health Questionnaire [SF-12] and the Euroqol instrument [EQ-5D]). Results: Included patients had, on average, four co-occurring chronic...

  17. Physics-Based Identification, Modeling and Risk Management for Aeroelastic Flutter and Limit-Cycle Oscillations (LCO), Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed research program will develop a physics-based identification, modeling and risk management infrastructure for aeroelastic transonic flutter and...

  18. Information Risk Management and Resilience

    Science.gov (United States)

    Dynes, Scott

    Are the levels of information risk management efforts within and between firms correlated with the resilience of the firms to information disruptions? This paper examines the question by considering the results of field studies of information risk management practices at organizations and in supply chains. The organizations investigated differ greatly in the degree of coupling from a general and information risk management standpoint, as well as in the levels of internal awareness and activity regarding information risk management. The comparison of the levels of information risk management in the firms and their actual or inferred resilience indicates that a formal information risk management approach is not necessary for resilience in certain sectors.

  19. Conceptualization and Pilot Testing of a Core Competency-Based Training Workshop in Suicide Risk Assessment and Management: Notes From the Field.

    Science.gov (United States)

    Cramer, Robert J; Bryson, Claire N; Eichorst, Morgam K; Keyes, Lee N; Ridge, Brittany E

    2017-03-01

    As professional psychology training programs and continuing education have moved toward competency based approaches, it has become equally important to develop uniform, evidence-based approaches for suicide risk assessment and management. The present article presents a workshop curriculum based on established core competencies in suicide risk assessment and management. Drawing on theories suicide risk formation, the workshop features an integration of didactic, process, and experiential components. We present pilot data from 2 small group workshops (n = 17): 1 from a clinical psychology doctoral program and 1 from a university counseling center. Workshop participation yielded increases in (a) the ability to recognize appropriate clinician responses to suicidal client statements, (b) self-perceptions of general capacity to interface with suicidal patients and mastery of the 10 core competencies, (c) factual knowledge concerning suicide risk assessment and management, and (d) the self-rated ability to assess and manage a suicidal patient. We discuss statistical and generalizability limitations as well as implications for future modification, implementation, and provision of this training method. © 2016 Wiley Periodicals, Inc.

  20. Continuous Risk Management at NASA

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  1. RISK LOAN PORTFOLIO OPTIMIZATION MODEL BASED ON CVAR RISK MEASURE

    Directory of Open Access Journals (Sweden)

    Ming-Chang LEE

    2015-07-01

    Full Text Available In order to achieve commercial banks liquidity, safety and profitability objective requirements, loan portfolio risk analysis based optimization decisions are rational allocation of assets.  The risk analysis and asset allocation are the key technology of banking and risk management.  The aim of this paper, build a loan portfolio optimization model based on risk analysis.  Loan portfolio rate of return by using Value-at-Risk (VaR and Conditional Value-at-Risk (CVaR constraint optimization decision model reflects the bank's risk tolerance, and the potential loss of direct control of the bank.  In this paper, it analyze a general risk management model applied to portfolio problems with VaR and CVaR risk measures by using Using the Lagrangian Algorithm.  This paper solves the highly difficult problem by matrix operation method.  Therefore, the combination of this paper is easy understanding the portfolio problems with VaR and CVaR risk model is a hyperbola in mean-standard deviation space.  It is easy calculation in proposed method.

  2. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  3. A Strategic Risk Management Framework for Multinational Enterprise

    DEFF Research Database (Denmark)

    Juul Andersen, Torben

    2005-01-01

    and economic risks that can be monitored within conventional reporting systems and managed through use of various derivative instruments. All the while, a dispersed multinational structure can be vulnerable to disruptions caused by changing economic conditions, competitive moves, and geopolitical developments......-frequency high-impact disaster events based on scenario analyses. Hence, there is a need to consider risk management approaches that integrate relatively transparent financial exposures with the consequences of uncertain and hard-to-quantify event risks. This paper outlines the contours of such a strategic risk...

  4. Operational Risk Assesement Tools for Quality Management in Banking Services

    OpenAIRE

    Dima, Alina Mihaela

    2009-01-01

    Among all the different types of risks that can affect financial companies, the operational risk can be the most devastating and the most difficult to anticipate. The management of operational risk is a key component of financial and risk management discipline that drives net income results, 2capital management and customer satisfaction. The present paper contains a statistical analysis in order to determine the number of operational errors as quality based services determinants, depending on...

  5. Applying risk management strategies to strengthen an IDS's investment policy.

    Science.gov (United States)

    Fine, R P

    1998-11-01

    The increased financial risk that not-for-profit integrated delivery systems have assumed to function under managed care has required them to become increasingly reliant on income and gains from their investment portfolios. This reliance underscores the need for these organizations to take steps to effectively manage their investment risk. Not-for-profit IDSs should establish a systematic approach to investment risk management that is based on maintaining a sound fiduciary infrastructure and having a clear understanding of risk exposures, the most important of which are policy and market risk. Applying reasonable and common-sense risk management strategies to investment policy will enhance an IDS's overall financial and competitive strength.

  6. AN EVALUATION OF RISK MANAGEMENT STRATEGIES FOR DAIRY FARMS

    OpenAIRE

    Bosch, Darrell J.; Johnson, Christian J.

    1992-01-01

    Variability in feed prices and crop yields are important sources of risk to dairy farmers. A simulation model of a representative dairy farm was used to evaluate crop insurance and hedging as risk management strategies. These strategies lowered expected net returns but also reduced risk. The preferred set of strategies at lower levels of risk aversion included hedging and crop insurance, although a base scenario in which no risk management strategies were employed was also efficient. The pref...

  7. Flood Risk Management in the People’s Republic of China: Learning to Live with Flood Risk

    OpenAIRE

    Asian Development Bank (ADB); Asian Development Bank (ADB); Asian Development Bank (ADB); Asian Development Bank (ADB)

    2012-01-01

    This publication presents a shift in the People’s Republic of China from flood control depending on structural measures to integrated flood management using both structural and non-structural measures. The core of the new concept of integrated flood management is flood risk management. Flood risk management is based on an analysis of flood hazard, exposure to flood hazard, and vulnerability of people and property to danger. It is recommended that people learn to live with flood risks, gaining...

  8. Health risk assessment for program managers

    International Nuclear Information System (INIS)

    Jump, R.A.; Williamson, D.S.

    1994-01-01

    This paper presents the findings of a sensitivity analysis into the independent variables that determine the levels of health risks posed by buried plutonium and americium at a typical contaminated site in an arid region. Environmental Restoration Program Managers often must make decisions concerning cleanup levels, remediation alternatives, schedules, cost estimates, etc. based upon extraordinarily safe assumptions about risk assessment calculation inputs. This study reveals to the Program Manager which variables are major drivers to the calculated levels of risk posed by transuranic radionuclides and which ones have second order effects or less. The findings of this study should indicate which inputs should be the focus of attention during negotiations with regulators and of further empirical investigation

  9. CEA - 2014 risk management assessment

    International Nuclear Information System (INIS)

    Bonnevie, Edwige; Verwaerde, Daniel; Maillot, Bernard

    2015-06-01

    After introducing presentations of CEA managers in charge of risk management and controls, this document presents and comments the actions undertaken by the CEA and the obtained results in terms of risk management in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transport of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal audits and controls. Other topics are addressed like the presentation of the risk management department, and the role of the CEA in the relationship between research and industry

  10. Barriers to implementation of risk management for federal wildland fire management agencies in the United States

    Science.gov (United States)

    Dave Calkin; Matthew P. Thompson; Alan A. Ager; Mark Finney

    2010-01-01

    In this presentation we review progress towards the implementation of a risk-based management framework for U.S. Federal wildland fire policy and operations. We first describe new developments in wildfire simulation technology that catalyzed the development of risk-based decision support systems for strategic wildfire management. These systems include new analytical...

  11. Risk Management Challenges in Large-scale Energy PSS

    DEFF Research Database (Denmark)

    Tegeltija, Miroslava; Oehmen, Josef; Kozin, Igor

    2017-01-01

    data and representation of the results to the decision makers play an important role. Second, we introduce a selection of alternative, so-called “post-probabilistic”, risk management methods developed across different scientific fields to cope with uncertainty due to lack of knowledge. Possibilities......Probabilistic risk management approaches have a long tradition in engineering. A large variety of tools and techniques based on the probabilistic view of risk is available and applied in PSS practice. However, uncertainties that arise due to lack of knowledge and information are still missing...... for overcoming industrial PSS risk management challenges are suggested through application of post-probabilistic methods. We conclude with the discussion on the importance for the field to consider their application....

  12. Risk-based decisionmaking in the DOE: Challenges and status

    International Nuclear Information System (INIS)

    Henry, C.J.; Alchowiak, J.; Moses, M.

    1995-01-01

    The primary mission of the Environmental Management Program is to protect human health and the environment, the first goal of which must be, to address urgent risks and threats. Another is to provide for a safe workplace. Without credible risk assessments and good risk management practices, the central environmental goals cannot be met. Principles for risk analysis which include principles for risk assessment, management, communication, and priority setting were adopted. As recommended, Environmental Management is using risk-based decision making in its budget process and in the implementation of its program. The challenges presented in using a risk-based Decision making process are to integrate risk assessment methods and cultural and social values so as to produce meaningful priorities. The different laws and regulations governing the Department define risk differently in implementing activities to protect human health and the environment, therefore, assumptions and judgements in risk analysis vary. Currently, the Environmental Management Program is developing and improving a framework to incorporate risk into the budget process and to link the budget, compliance requirements and risk reduction/pollution prevention activities

  13. Risk-based decisionmaking in the DOE: Challenges and status

    Energy Technology Data Exchange (ETDEWEB)

    Henry, C.J.; Alchowiak, J.; Moses, M. [Dept. of Energy, Washington, DC (United States)] [and others

    1995-12-31

    The primary mission of the Environmental Management Program is to protect human health and the environment, the first goal of which must be, to address urgent risks and threats. Another is to provide for a safe workplace. Without credible risk assessments and good risk management practices, the central environmental goals cannot be met. Principles for risk analysis which include principles for risk assessment, management, communication, and priority setting were adopted. As recommended, Environmental Management is using risk-based decision making in its budget process and in the implementation of its program. The challenges presented in using a risk-based Decision making process are to integrate risk assessment methods and cultural and social values so as to produce meaningful priorities. The different laws and regulations governing the Department define risk differently in implementing activities to protect human health and the environment, therefore, assumptions and judgements in risk analysis vary. Currently, the Environmental Management Program is developing and improving a framework to incorporate risk into the budget process and to link the budget, compliance requirements and risk reduction/pollution prevention activities.

  14. Risk and/or resilience management

    Directory of Open Access Journals (Sweden)

    Jean-Paul Louisot

    2015-06-01

    Full Text Available Risk management aims at managing all the uncertainties that may interfere with the objectives and missions of the organization. Resilience engineering aims at building its capacity to get over disturbances or stress while keeping the functionalities needed to survive, and possibly thrive. A recently open debate on an Internet blog launched by the risk managers of the Scottish Widows Bank seems to arise from what some professionals see as two competing branches of the management sciences. Whereas through the development of ERM – Enterprise-wide Risk Managementrisk management is emerging at last to become a science, as well as an art and a practice, the mentioned above centered on the role of a newly forged name “resilience management”. This opens a new front of the many debates that could derail the path to maturity of Risk Management as a science and reopen new silos much as Business Impact Analysis, BIA, or continuity management, might do if a clear distinction is not made between science, objectives and tools. However, because organizations are so interconnected today in the supply cloud that it is inevitable that they will face catastrophic risk and this is why resilience needs to be a core objective of any risk management plan? Whereas traditional risk management techniques alone may not be adequate to deal with such pervasive and insipient risk scenarios, resilience is ingrained into ERM

  15. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  16. Multicriteria Decision Framework for Cybersecurity Risk Assessment and Management.

    Science.gov (United States)

    Ganin, Alexander A; Quach, Phuoc; Panwar, Mahesh; Collier, Zachary A; Keisler, Jeffrey M; Marchese, Dayton; Linkov, Igor

    2017-09-05

    Risk assessors and managers face many difficult challenges related to novel cyber systems. Among these challenges are the constantly changing nature of cyber systems caused by technical advances, their distribution across the physical, information, and sociocognitive domains, and the complex network structures often including thousands of nodes. Here, we review probabilistic and risk-based decision-making techniques applied to cyber systems and conclude that existing approaches typically do not address all components of the risk assessment triplet (threat, vulnerability, consequence) and lack the ability to integrate across multiple domains of cyber systems to provide guidance for enhancing cybersecurity. We present a decision-analysis-based approach that quantifies threat, vulnerability, and consequences through a set of criteria designed to assess the overall utility of cybersecurity management alternatives. The proposed framework bridges the gap between risk assessment and risk management, allowing an analyst to ensure a structured and transparent process of selecting risk management alternatives. The use of this technique is illustrated for a hypothetical, but realistic, case study exemplifying the process of evaluating and ranking five cybersecurity enhancement strategies. The approach presented does not necessarily eliminate biases and subjectivity necessary for selecting countermeasures, but provides justifiable methods for selecting risk management actions consistent with stakeholder and decisionmaker values and technical data. Published 2017. This article is a U.S. Government work and is in the public domain in the U.S.A.

  17. Shutdown risk management applied at Philadelphia Electric Company

    International Nuclear Information System (INIS)

    Dagan, William J.; True, Douglas E.; Wilson, Thomas; Truax, William

    2004-01-01

    interactive reliance upon risk models but with clear, well founded analytical bases. This methodology is being expanded to address both forced outage and at-power configurations. The result will provide a consistent framework which relies upon appropriate models for each configuration but presents consistent understandable information to management and decision makers. The use of such tools clearly represents an opportunity to improve the decision making process and enhance overall operational effectiveness. This paper includes examples of shutdown, at-power, and forced outage situations and presents management guidance appropriate for such cases. Several analytical methods currently being used are presented. (author)

  18. Health Risk-Based Assessment and Management of Heavy Metals-Contaminated Soil Sites in Taiwan

    Directory of Open Access Journals (Sweden)

    Zueng-Sang Chen

    2010-10-01

    Full Text Available Risk-based assessment is a way to evaluate the potential hazards of contaminated sites and is based on considering linkages between pollution sources, pathways, and receptors. These linkages can be broken by source reduction, pathway management, and modifying exposure of the receptors. In Taiwan, the Soil and Groundwater Pollution Remediation Act (SGWPR Act uses one target regulation to evaluate the contamination status of soil and groundwater pollution. More than 600 sites contaminated with heavy metals (HMs have been remediated and the costs of this process are always high. Besides using soil remediation techniques to remove contaminants from these sites, the selection of possible remediation methods to obtain rapid risk reduction is permissible and of increasing interest. This paper discusses previous soil remediation techniques applied to different sites in Taiwan and also clarified the differences of risk assessment before and after soil remediation obtained by applying different risk assessment models. This paper also includes many case studies on: (1 food safety risk assessment for brown rice growing in a HMs-contaminated site; (2 a tiered approach to health risk assessment for a contaminated site; (3 risk assessment for phytoremediation techniques applied in HMs-contaminated sites; and (4 soil remediation cost analysis for contaminated sites in Taiwan.

  19. Health Risk-Based Assessment and Management of Heavy Metals-Contaminated Soil Sites in Taiwan

    Science.gov (United States)

    Lai, Hung-Yu; Hseu, Zeng-Yei; Chen, Ting-Chien; Chen, Bo-Ching; Guo, Horng-Yuh; Chen, Zueng-Sang

    2010-01-01

    Risk-based assessment is a way to evaluate the potential hazards of contaminated sites and is based on considering linkages between pollution sources, pathways, and receptors. These linkages can be broken by source reduction, pathway management, and modifying exposure of the receptors. In Taiwan, the Soil and Groundwater Pollution Remediation Act (SGWPR Act) uses one target regulation to evaluate the contamination status of soil and groundwater pollution. More than 600 sites contaminated with heavy metals (HMs) have been remediated and the costs of this process are always high. Besides using soil remediation techniques to remove contaminants from these sites, the selection of possible remediation methods to obtain rapid risk reduction is permissible and of increasing interest. This paper discusses previous soil remediation techniques applied to different sites in Taiwan and also clarified the differences of risk assessment before and after soil remediation obtained by applying different risk assessment models. This paper also includes many case studies on: (1) food safety risk assessment for brown rice growing in a HMs-contaminated site; (2) a tiered approach to health risk assessment for a contaminated site; (3) risk assessment for phytoremediation techniques applied in HMs-contaminated sites; and (4) soil remediation cost analysis for contaminated sites in Taiwan. PMID:21139851

  20. 12 CFR Appendix B to Part 3 - Risk-Based Capital Guidelines; Market Risk Adjustment

    Science.gov (United States)

    2010-01-01

    ...) The bank must have a risk control unit that reports directly to senior management and is independent... management systems at least annually. (c) Market risk factors. The bank's internal model must use risk.... Section 4. Internal Models (a) General. For risk-based capital purposes, a bank subject to this appendix...

  1. Stress Analysis in Managing the Region’s Budget Risks

    Directory of Open Access Journals (Sweden)

    Natalya Pavlovna Pazdnikova

    2014-09-01

    Full Text Available The article addresses the implementation of budget risk management methods into the practices of governmental authorities. Drawing on the example of a particular region the article aims to demonstrate the possible methods of budget risk management. The authors refine the existing approaches to the notion of risk in its relation to budget system by introducing the notion of “budget risk.” Here the focus is the risk of default of budget spending in full which causes underfunding of territories and decrease in quality of life in the region. The authors have particularized the classification of budget risks and grouped together the criteria and factors which significantly influence the assessment and choice of method to manage budget risks. They hypothesize that budget risk is a financial risk. Therefore, the methods of financial risks management can be applied to budget risks management. The authors suggest a methodological approach to risk assessment based on correlation and regression analysis of program financing. The application of Kendall rank correlation coefficient allowed to assess the efficiency of budget spending on the implementation of state programs in Perm Krai. Two clusters — “Nature management and infrastructure” and “Public security” — turned out to be in the zone of high budget risk. The method of stress analysis, which consists in calculating Value at Risk (VaR, was applied to budget risks that in terms of probability are classified as critical. In order to assess risk as probability rate, the amount of Perm Krai deficit budget was calculated as induced variable from budget revenues and spending. The results demonstrate that contemporary management of public resources in the regions calls for the implementation of new management tools of higher quality and budget risk management is one of them.

  2. Toward effective ecological risk-management of refinery corrective action

    International Nuclear Information System (INIS)

    Metzger, B.H.; Rury, P.M.; Turton, D.; Archibald, B.; Clark, J.; Cura, J.

    1995-01-01

    Cleanup of complex industrial sites, such as refineries, requires risk-based decision tools to ensure that environmentally protective remediation is consistent with current and future land use. However, conventional ecological risk assessment approaches are not well suited for complex industrial sites. Site risk assessments focus on hypothetical chemical risk assuming diverse and undisturbed ecosystems, rather than industrial and disturbed area conditions. In addition, they offer little guidance as to how to make timely and effective risk management decisions. An innovative methodology is proposed to assist industry and regulatory risk managers with rapid EcoRisk reconnaissance and cost-effective remedial decision-making at complex industrial sites. Phase 1 comprises a three-step risk screening of areas of ecological concern at the site, which integrates habitat quality characteristics and potential chemical hazards. It yields an ordering of areas as follows: areas of no significant risk; areas of potentially significant risk; and areas of likely significant risk. A decision rule is then applied to determine appropriate risk management action, including: no action; additional study; and remedial or management action. In Phase 2, additional study is conducted for areas that exhibit potentially significant risk so as to facilitate risk management. This methodology is currently being applied at the 1,300 acre, former Exxon Bayway Refinery in New Jersey

  3. Application of a risk management system to improve drinking water safety.

    Science.gov (United States)

    Jayaratne, Asoka

    2008-12-01

    The use of a comprehensive risk management framework is considered a very effective means of managing water quality risks. There are many risk-based systems available to water utilities such as ISO 9001 and Hazard Analysis and Critical Control Point (HACCP). In 2004, the World Health Organization's (WHO) Guidelines for Drinking Water Quality recommended the use of preventive risk management approaches to manage water quality risks. This paper describes the framework adopted by Yarra Valley Water for the development of its Drinking Water Quality Risk Management Plan incorporating HACCP and ISO 9001 systems and demonstrates benefits of Water Safety Plans such as HACCP. Copyright IWA Publishing 2008.

  4. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  5. Business Process Risk Management, Compliance and Internal Control: A Research Agenda

    DEFF Research Database (Denmark)

    Rikhardsson, Pall M.; Best, Peter; Green, Peter

    (COSO). Based on an inductive methodological approach using literature review and interviews with managers engaged in risk management and internal control projects, this paper identifies three main areas that currently have management attention. These are business process risk management, compliance......Integration of risk management and management control is emerging as an important area in the wake of the Sarbanes-Oxley Act and with ongoing development of frameworks such as the Enterprise Risk Management (ERM) framework from the Committee of Sponsoring Organizations of the Treadway Commission...... management and internal control development. This paper discusses these areas and identifies a series of research questions regarding these critical issues....

  6. Business Process Risk Management, Compliance and Internal Control: A Research Agenda

    OpenAIRE

    Rikhardsson, Pall; Best, Peter; Green, Peter; Rosemann, Michael

    2006-01-01

    Integration of risk management and management control is emerging as an important area in the wake of the Sarbanes-Oxley Act and with ongoing development of frameworks such as the Enterprise Risk Management (ERM) framework from the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on an inductive methodological approach using literature review and interviews with managers engaged in risk management and internal control projects, this paper identifies three main ar...

  7. Data Management in Metagenomics: A Risk Management Approach

    Directory of Open Access Journals (Sweden)

    Filipe Ferreira

    2014-07-01

    Full Text Available In eScience, where vast data collections are processed in scientific workflows, new risks and challenges are emerging. Those challenges are changing the eScience paradigm, mainly regarding digital preservation and scientific workflows. To address specific concerns with data management in these scenarios, the concept of the Data Management Plan was established, serving as a tool for enabling digital preservation in eScience research projects. We claim risk management can be jointly used with a Data Management Plan, so new risks and challenges can be easily tackled. Therefore, we propose an analysis process for eScience projects using a Data Management Plan and ISO 31000 in order to create a Risk Management Plan that can complement the Data Management Plan. The motivation, requirements and validation of this proposal are explored in the MetaGen-FRAME project, focused in Metagenomics.

  8. The use of risk management principles in planning an internal audit ...

    African Journals Online (AJOL)

    Kirstam

    12Key words: risk management, key risks, internal auditing, risk-based internal auditing, internal audit .... a structured approach, regardless of the engagement type (for example, a compliance audit), the level of the ... risk management approach (also referred to as 'organisational' or 'enterprise-wide'), rather than a silo ...

  9. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  10. Potential impact of single-risk-factor versus total risk management for the prevention of cardiovascular events in Seychelles.

    Science.gov (United States)

    Ndindjock, Roger; Gedeon, Jude; Mendis, Shanthi; Paccaud, Fred; Bovet, Pascal

    2011-04-01

    To assess the prevalence of cardiovascular (CV) risk factors in Seychelles, a middle-income African country, and compare the cost-effectiveness of single-risk-factor management (treating individuals with arterial blood pressure ≥ 140/90 mmHg and/or total serum cholesterol ≥ 6.2 mmol/l) with that of management based on total CV risk (treating individuals with a total CV risk ≥ 10% or ≥ 20%). CV risk factor prevalence and a CV risk prediction chart for Africa were used to estimate the 10-year risk of suffering a fatal or non-fatal CV event among individuals aged 40-64 years. These figures were used to compare single-risk-factor management with total risk management in terms of the number of people requiring treatment to avert one CV event and the number of events potentially averted over 10 years. Treatment for patients with high total CV risk (≥ 20%) was assumed to consist of a fixed-dose combination of several drugs (polypill). Cost analyses were limited to medication. A total CV risk of ≥ 10% and ≥ 20% was found among 10.8% and 5.1% of individuals, respectively. With single-risk-factor management, 60% of adults would need to be treated and 157 cardiovascular events per 100000 population would be averted per year, as opposed to 5% of adults and 92 events with total CV risk management. Management based on high total CV risk optimizes the balance between the number requiring treatment and the number of CV events averted. Total CV risk management is much more cost-effective than single-risk-factor management. These findings are relevant for all countries, but especially for those economically and demographically similar to Seychelles.

  11. THE ANALYSIS OF RISK MANAGEMENT PROCESS WITHIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    ROMANESCU MARCEL LAURENTIU

    2016-10-01

    Full Text Available This article highlights the risk analysis within management, focusing on how a company could practicaly integrate the risks management in the existing leading process. Subsequently, it is exemplified the way of manage risk effectively, which gives numerous advantages to all firms, including improving their decision-making process. All these lead to the conclusion that the degree of risk specific to companies is very high, but if managers make the best decisions then it can diminish it and all business activitiy and its income are not influenced by factors that could disturb in a negative way .

  12. Innovations in Quantitative Risk Management

    CERN Document Server

    Scherer, Matthias; Zagst, Rudi

    2015-01-01

    Quantitative models are omnipresent –but often controversially discussed– in todays risk management practice. New regulations, innovative financial products, and advances in valuation techniques provide a continuous flow of challenging problems for financial engineers and risk managers alike. Designing a sound stochastic model requires finding a careful balance between parsimonious model assumptions, mathematical viability, and interpretability of the output. Moreover, data requirements and the end-user training are to be considered as well. The KPMG Center of Excellence in Risk Management conference Risk Management Reloaded and this proceedings volume contribute to bridging the gap between academia –providing methodological advances– and practice –having a firm understanding of the economic conditions in which a given model is used. Discussed fields of application range from asset management, credit risk, and energy to risk management issues in insurance. Methodologically, dependence modeling...

  13. Quantitative risk-based approach for improving water quality management in mining.

    Science.gov (United States)

    Liu, Wenying; Moran, Chris J; Vink, Sue

    2011-09-01

    The potential environmental threats posed by freshwater withdrawal and mine water discharge are some of the main drivers for the mining industry to improve water management. The use of multiple sources of water supply and introducing water reuse into the mine site water system have been part of the operating philosophies employed by the mining industry to realize these improvements. However, a barrier to implementation of such good water management practices is concomitant water quality variation and the resulting impacts on the efficiency of mineral separation processes, and an increased environmental consequence of noncompliant discharge events. There is an increasing appreciation that conservative water management practices, production efficiency, and environmental consequences are intimately linked through the site water system. It is therefore essential to consider water management decisions and their impacts as an integrated system as opposed to dealing with each impact separately. This paper proposes an approach that could assist mine sites to manage water quality issues in a systematic manner at the system level. This approach can quantitatively forecast the risk related with water quality and evaluate the effectiveness of management strategies in mitigating the risk by quantifying implications for production and hence economic viability.

  14. Risk assessment and risk management in managed aquifer recharge

    CSIR Research Space (South Africa)

    Page, D

    2012-06-01

    Full Text Available This chapter presents the methodologies used for risk assessment and risk management in MAR in Australia and the European Union, qualitative and quantitative approaches adopted within the RECLAIM Water project and case studies where the outcomes...

  15. Value of risk management

    OpenAIRE

    Vik, Marie Amdal

    2012-01-01

    Master's thesis in Risk management The overall aim of this study was to discuss the validity of the hypothesis that risk management contributes with added value to projects and the enterprise holding the projects, and consequently to the enterprise’s stakeholders. To examine this hypothesis, a case study of three projects taken from the same portfolio at Statoil was selected. The projects were said to have an active risk management. Data was collected from the project’s documentation as...

  16. Supply Cain Risk Management

    OpenAIRE

    Goodwin, Les

    2011-01-01

    “The management of supply chain risk is crucial to any business, more so to Rolls Royce who face an almost doubling of load within the next 10 years. So what is supply chain risk management and how well is it deployed within an operational business of Rolls Royce? What are the tools and techniques available and what are the key issues around implementing world class supply chain risk management with a Supply Chain Unit within Rolls Royce?”

  17. Credit risk management in banks

    OpenAIRE

    Pětníková, Tereza

    2014-01-01

    The subject of this diploma thesis is managing credit risk in banks, as the most significant risk faced by banks. The aim of this work is to define the basic techniques, tools and methods that are used by banks to manage credit risk. The first part of this work focuses on defining these procedures and describes the entire process of credit risk management, from the definition of credit risk, describing credit strategy and policy, organizational structure, defining the most used credit risk mi...

  18. Management of business risks

    OpenAIRE

    BAZARBAY A.

    2015-01-01

    The article presents methodological ideas concerning the problem of risk management. Special attention is paid to increasing of enterprises' operating efficiency by means of risk-management system development in business organizations.

  19. The Uncertainties of Risk Management

    DEFF Research Database (Denmark)

    Vinnari, Eija; Skærbæk, Peter

    2014-01-01

    for expanding risk management. More generally, such uncertainties relate to the professional identities and responsibilities of operational managers as defined by the framing devices. Originality/value – The paper offers three contributions to the extant literature: first, it shows how risk management itself......Purpose – The purpose of this paper is to analyse the implementation of risk management as a tool for internal audit activities, focusing on unexpected effects or uncertainties generated during its application. Design/methodology/approach – Public and confidential documents as well as semi......-structured interviews are analysed through the lens of actor-network theory to identify the effects of risk management devices in a Finnish municipality. Findings – The authors found that risk management, rather than reducing uncertainty, itself created unexpected uncertainties that would otherwise not have emerged...

  20. Risk management and corporate value

    Directory of Open Access Journals (Sweden)

    Milan Cupic

    2015-12-01

    Full Text Available The paper presents a theoretical framework for assessing the impact of risk management on corporate value. As the relevant factors that determine this impact, the paper analyzes market imperfections and investors’ risk aversion. The results of the present research indicate that risk management contributes to an increase in corporate value if, under the influence of market imperfections, corporate risk exposure is concave. As an expression of market imperfections, the paper analyzes the costs of financial distress, agency costs, and taxation. The results of the research also indicate that the risk management policy should not aim to minimize, but rather optimize risk exposure, by taking into account the costs of risk management, investors’ risk aversion and the competitive advantage a corporation has on the relevant market.

  1. Influence of green supply chain risk management on performance of Chinese manufacturing enterprises

    Science.gov (United States)

    Zhang, Dongying; Yuting, Duan; Junyi, Shen

    2017-12-01

    This paper briefly introduces the background of the research on the impact of green supply chain risk management on corporate performance, reviews the relevant research literature at home and abroad, and uses the gray relational analysis to analyze the impact of the green supply chain risk management on enterprise performance based on 26 industry-related statistical data, from purchasing risk management performance,manufacturing risk management performance and marketing risk management performance.

  2. CEA: risk management assessment 2011

    International Nuclear Information System (INIS)

    Bigot, Bernard; Bonnevie, Edwige; Maillot, Bernard

    2012-01-01

    This report proposes a qualitative and quantitative overview of CEA activities in the field of risk management during 2011. These activities concerned the impact on the environment, the safety of installations, the management of professional risks (safety and health at work), the radiological protection of workers, the transports of hazardous materials, waste management, protection of sites, installations and heritage, the management of emergency situations, the management of law risks, controls and audits

  3. Lean and agile supply chain management concepts in the aspect of risk management

    Directory of Open Access Journals (Sweden)

    2010-12-01

    Full Text Available Lean and agile supply chain managements, as well as the hybrid forms (leagile supply chains, are popular and relatively widely discussed in literature. However, there are some disputes concerning differentiating these types of the management from tools and instruments such as outsourcing, single sourcing, quick response, standardizing principles and postponement. The above-mentioned concepts are discussed in a positive light as tools for achieving a competitive advantage of supply chains. A recently introduced term SCRM (Supply Chain Risk Management emphasizes the importance of the risk management in supply chains also due to the ability to achieve a competitive advantage of those chains in which a risk is identified, estimated, managed and controlled. Therefore, it seems to be of benefit to look for the relationships and dependencies between these concepts (some references were made to the author's own research. A significant part of the papers concerns the identification of risks related to the above-mentioned instruments of supply chain management. However, the concepts of lean and agile management are often discussed due to the fundamental determiners of the functioning of a supply chain such as the nature of the demand, the character of goods and the total lead-time. According to the author, the discussed concepts could be viewed concerning supply chain risk management. It could facilitate the choice of a supply chain strategy based on the risk analysis. Several case studies were included to support the presented considerations.

  4. Risk management through dynamic technical specifications

    International Nuclear Information System (INIS)

    Klopp, George T.; Petersen, Thomas A.

    2004-01-01

    The wide deployment of plant specific probabilistic risk assessments for nuclear power plants has provided the means to effect a fresh risk management perspective and a fresh, risk based, regulatory outlook on nuclear power. There has been a great deal of conversation on risk based regulation within the U. S. nuclear power industry but, curiously, very little on effective risk management. This paper proposes a means to link the two subjects through the plant Technical Specifications. A revised concept for Technical Specifications is suggested which is based on deterministic analyses and probabilistic risk assessments for each plant. The revised Technical Specifications would consider, on a real-time basis, the exact state of the plant in terms of the status of key components and systems. It would depict current plant risk levels and compare those levels to the desired and limiting (alert/action) levels. It would advise the plant operator on the risk impact of proposed actions through a simple query system and illustrate the impact of such actions on plant status relative to designated risk values. The basis for the proposed approach lies in realistic deterministic plant analyses and probabilistic risk assessment (PRA) deployment tools being developed, in parallel, by a number of parties in the U.S. today. These PRAs are based primarily on the existing plant responses to Generic Letter 88-20, 'Individual Plant Examinations' (IPEs). Each of these tools allows the plant operator to input, on a real-time basis, the status of key equipment and systems. The tools then provide explicit illustrations of dependency effects; updated, 'real-time' risk status indications such as core damage frequency; and, in some cases, allow the operator to assess the risk impact of removing from service selected components for maintenance or testing. These systems generally operate on personal computers and provide nearly instantaneous responses to plant queries. Moving from these tools to

  5. The NASA Continuous Risk Management Process

    Science.gov (United States)

    Pokorny, Frank M.

    2004-01-01

    As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics

  6. CEA: assessment of risk management 2011

    International Nuclear Information System (INIS)

    2012-06-01

    This report proposes an overview of CEA activities in the field of risk management in different areas: impact on the environment, installation safety, management of occupational risks (occupational health and safety), radiological protection of workers, transportation of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of law risks, controls and audits. It finally presents the risk management department

  7. Risk management for food and beverage industry using Australia/New Zealand 4360 Standard

    Science.gov (United States)

    Kristina, S.; Wijaya, B. M.

    2017-12-01

    This research aims to identifying, measuring and establishing risk in food and beverage industry. The risk management is implemented by referring to Australia/New Zealand 4360 Standard which has four phases such as problem formulation, risk analysis, risk characterization, and risk management. The implementation of risk management is done by case study at Back Alley Café. Based on the risk identification result, there are 59 risks were found in Back Alley Café. The risk identification is conducted based on observation and interview with the café manager who understand the condition of Back Alley Café properly. Based on the assessment of impact and probability, the risk mapping produced four risks at extreme level, 16 risks at high level, 24 risks at medium level, and 18 risks at low level. The strategy was designed as the risk mitigation after the risk mapping for the extreme and high level. The strategy which is given as the prevention or treatment of risk in Back Alley Café is divided into three. There are reducing the risk, sharing the risk and accepting the risk. The strategy is then implemented for each relevant activities.

  8. Risk-based methodology for USNRC inspections

    International Nuclear Information System (INIS)

    Wong, S.M.; Holahan, G.M.; Chung, J.W.; Johnson, M.R.

    1995-01-01

    This paper describes the development and trial applications of a risk-based methodology to enhance the inspection processes for US nuclear power plants. Objectives of risk-based methods to complement prescriptive engineering approaches in US Nuclear Regulatory Commission (USNRC) inspection programs are presented. Insights from time-dependent risk profiles of plant configurational from Individual Plant Evaluation (IPE) studies were integrated to develop a framework for optimizing inspection efforts in NRC regulatory initiatives. Lessons learned from NRC pilot applications of the risk-based methodology for evaluation of the effectiveness of operational risk management programs at US nuclear power plant sites are also discussed

  9. Managing risk at Hanford

    International Nuclear Information System (INIS)

    Hesser, W.A.; Stillwell, W.G.; Rutherford, W.A.

    1994-01-01

    Clearly, there is sufficient motivation from Washington for the Hanford community to pay particular attention to the risks associated with the substantial volumes of radiological, hazardous, and mixed waste at Hanford. But there is also another reason for emphasizing risk: Hanford leaders have come to realize that their decisions must consider risk and risk reduction if those decisions are to be technically sound, financially affordable, and publicly acceptable. The 560-square miles of desert land is worth only a few thousand dollars an acre (if that) -- hardly enough to justify the almost two billion dollars that will be spent at Hanford this year. The benefit of cleaning up the Hanford Site is not the land but the reduction of potential risk to the public and the environment for future generations. If risk reduction is our ultimate goal, decisions about priority of effort and resource allocation must consider those risks, now and in the future. The purpose of this paper is to describe how Hanford is addressing the issues of risk assessment, risk management, and risk-based decision making and to share some of our experiences in these areas

  10. Qualitative risk assessment as a remediation management tool

    International Nuclear Information System (INIS)

    Knutson, D.E.

    1991-01-01

    The technique used to complete this thesis utilizes existing NRC and EPA guidance on health-based risk to qualitatively prioritize preliminary assessments and provide a tool for the direction and management of remediation activities. This method is intended as a decision making tool to aid in prioritizing the remediation effort and manage the remedial investigation and feasibility study (RI/FS) process. It is not a replacement for the RI/FS. The methodology for qualitative risk assessment utilizes data gathered in preliminary assessments and calculates the health-based hazards and consequences from contaminants found at each individual location. The health-based qualitative risk indicated that number-sign 6 fuel oil, carbon tetrachloride, depleted uranium, and enriched uranium were the contaminants of major concern, in that order. Plutonium ranked approximately sixth in the contaminant of concern priority. 38 refs., 1 fig., 9 tabs

  11. Risk Preferences, Probability Weighting, and Strategy Tradeoffs in Wildfire Management.

    Science.gov (United States)

    Hand, Michael S; Wibbenmeyer, Matthew J; Calkin, David E; Thompson, Matthew P

    2015-10-01

    Wildfires present a complex applied risk management environment, but relatively little attention has been paid to behavioral and cognitive responses to risk among public agency wildfire managers. This study investigates responses to risk, including probability weighting and risk aversion, in a wildfire management context using a survey-based experiment administered to federal wildfire managers. Respondents were presented with a multiattribute lottery-choice experiment where each lottery is defined by three outcome attributes: expenditures for fire suppression, damage to private property, and exposure of firefighters to the risk of aviation-related fatalities. Respondents choose one of two strategies, each of which includes "good" (low cost/low damage) and "bad" (high cost/high damage) outcomes that occur with varying probabilities. The choice task also incorporates an information framing experiment to test whether information about fatality risk to firefighters alters managers' responses to risk. Results suggest that managers exhibit risk aversion and nonlinear probability weighting, which can result in choices that do not minimize expected expenditures, property damage, or firefighter exposure. Information framing tends to result in choices that reduce the risk of aviation fatalities, but exacerbates nonlinear probability weighting. © 2015 Society for Risk Analysis.

  12. Risk-Based Models for Managing Data Privacy in Healthcare

    Science.gov (United States)

    AL Faresi, Ahmed

    2011-01-01

    Current research in health care lacks a systematic investigation to identify and classify various sources of threats to information privacy when sharing health data. Identifying and classifying such threats would enable the development of effective information security risk monitoring and management policies. In this research I put the first step…

  13. Ethical Aspects of Radiation Risk Management

    OpenAIRE

    Wikman-Svahn, Per

    2012-01-01

    This thesis is based on the assumption that the intersection of moral philosophy and practical risk management is a rewarding area to study. In particular, the thesis assumes that concepts, ideas, and methods that are used in moral philosophy can be of great benefit for risk analysis, but also that practices in risk regulation provide a useful testing ground for moral philosophical theories. The thesis consists of an introduction and five articles. Article I is a review article on social and ...

  14. Role of NDT in risk management

    International Nuclear Information System (INIS)

    Porter, Jr. James F.

    2009-01-01

    Risk management is identifying and then managing threats that could severely affect or bring down a company. This involves reviewing the operations of the company to include the process, equipment, procedures and personnel. Potential threats are then identified including their probability of occurrence, and then taking appropriate actions to address the most likely threats. Traditionally, risk management was thought of as mostly getting the right insurance. However, this impression of risk management has changed dramatically. With the recent increase in rules and regulations and optimizing utilization of key resources, risk management is becoming a management practice that is as important as financial or facilities management. In ideal risk management, a prioritization process is followed whereby the risks with the greatest loss and greatest probability of occurring are handled first, and risks with lower probability of occurrence and lower loss are handled in descending order. In practice the process can be very difficult, and balancing between risks with a high probability of occurrence but lower loss versus a risk with high but lower probability of occurrence can often be mishandled. (author)

  15. The Key to Risk Management: Management

    OpenAIRE

    Adrian E. Tschoegl

    2000-01-01

    The Barings, Daiwa Bank and Sumitomo Corp. financial debacles in the mid-1990s suggest that management failures rather than misfortune, errors, or complexity are a major source of the risk of financial debacles. These errors are systematic and are a concommittant of the structure of trading and of human nature. Risk management systems must take these facts into account.

  16. 48 CFR 39.102 - Management of risk.

    Science.gov (United States)

    2010-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... evaluation of risk-based assessment data; prototyping prior to implementation; post implementation reviews to...

  17. [Legal and methodical aspects of occupational risk management].

    Science.gov (United States)

    2011-01-01

    Legal and methodical aspects of occupational risk management (ORM) are considered with account of new official documents. Introduction of risk and risk management notions into Labor Code reflects the change of forms of occupational health and safety. The role of hygienist and occupational medicine professionals in workplace conditions certification (WCC) and periodical medical examinations (PME) is strengthened. The ORM could be improved by introducing the block of prognosis and causation based on IT-technologies that could match systems of WCC and PME thus improving the effectiveness of prophylactics.

  18. Framework for systematic risk management

    International Nuclear Information System (INIS)

    Knief, R.A.; Mahn, J.A.; Briant, V.S.; Lee, R.B.; Long, R.L.

    1991-01-01

    The first paper of the Symposium described GPU Nuclear's Risk Management Group (RMG) and the use of literature search and interviews in a extensive study of risk management. One of the most important goals of the study was to identify comprehensive approaches to managing risk in the nuclear and major high-technology industries. This paper discusses RMG's multi-step generic risk-management process consisting of the following steps to: identify hazards; screen hazards and identify preventive actions, including costs; evaluate hazards for severity, probable frequency, and cost of preventive actions; prioritize preventive actions (preference to high risk and low cost); implement preventive actions; monitor and provide feedback

  19. Risk Management Improvement of Engineering Projects in Woodworking Industry

    Directory of Open Access Journals (Sweden)

    Simona Bartkutė

    2014-02-01

    Full Text Available Risk is a complex phenomenon that has physical, monetary, cultural and social dimensions. Every company wants tosave money, time, increase quality, optimise manufacturing, but each factor may involve different risks with different influenceto company, its reputation. The aim of the research is to find better risk management improvement decisions, using techniquesthat could help to reduce risk impact in wood-based nonstandard production with shorter project time, smoother design process,lower costs, better project coordination, increased ability to manage problems, technical solutions.

  20. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  1. Risk Management in Mergers and Acquisitions

    Directory of Open Access Journals (Sweden)

    Dmitry O. Verdiev

    2015-01-01

    Full Text Available M&A statistics show that less than a third of newly merged companies has realized their planned synergistic effects and increased shareholder value. According to the author, such disgusting situation is due to improper planning and failure of corporate management to understand the importance of risk management in M&A. Lack of practice in identification, evaluation, mitigation and regular monitoring of risks leads to the situation when many companies merge despite the fact that the merger bears substantial risks. Corporate management fails to include risk mitigation expenses in merger costs. In many cases, risk mitigation expenses may be so substantive that the merger loses its attractiveness. Only few companies implement risk management methodology while planning M&A activity. This methodology may anticipate and minimize the consequences of various risk factors that negatively influence integration process. The article suggests an implementation of risk management best practice. This risk management best practice may act as an effective tool of successful realization of synergistic effects in M&A and may be helpful in increasing shareholder value in post-merger period. Risk management is conducted throughout the stages of merger and includes identification, analysis, assessment, management and monitoring of risks. Implementation of risk management at early stages of merger planning significantly decreases uncertainty in relation to achievement of financial and operational goals of newly merged company. The article provides with typical M&A risk matrix that may be adapted for specific M&A project. Risk matrix includes a register of risks sorted by stages of M&A deal, quality assessment of their probability, influence and impact on merger as well as risk mitigation methods.

  2. Risk Management in Cocurricular Activities.

    Science.gov (United States)

    Webb, Edward M.

    1988-01-01

    Discusses risk management for colleges' cocurricular activities. Discusses tort liability, contributory negligence, and assumption of risk. Provides six concrete steps for managing risks responsibly and professionally: adopting an educational mission statement, assigning risk to others, establishing safety standards, training club advisors,…

  3. A challenge for land and risk managers: differents stakeholders, differents definitions of the risks

    Science.gov (United States)

    Fernandez, M.; Ruegg, J.

    2012-04-01

    In developing countries, mountain populations and territories are subject to multiple risks and vulnerabilities. In addition, they face even greater challenges than developed countries due to lack of knowledge, resources and technology. There are many different types of actors in society that manage risk at various scales and levels (i.e. engineers, geologists, administrators, land use planners, merchants and local indigenous and non-indigenous people). Because of limited resources and possibilities to reduce all types of risk, these different actors, or 'risk managers' have to choose and compete to prioritize which types of risks to address. This paper addresses a case study from San Cristobal Altaverapaz, Guatemala where a large landslide "Los Chorros", a catastrophic collapse of 6 millions cubic meters of rock, is affecting several communities and one of the country's main west-east access highways. In this case, the government established that the "primary" risk is the landslide, whereas other local stakeholders consider the primary risks to be economic This paper, situated at the cross section between political science, geography and disaster risk management, addresses the social conflict and competition for priorities and solutions for risk management, depending on the group of actors based on the on-going Los Chorros, Guatemala landslide mitigation process. This work is based on the analysis of practices, (Practical Science), policies and institutions in order to understand how the inclusion of multiple stakeholders in determining risk priorities can lead to more sustainable risk management in a given territory. The main objective of this investigation is first to identify and understand the juxtaposition of different readings of the risk equation, usually considered the interface between vulnerability, exposure and hazards. Secondly, it is to analyze the mechanisms of actions taken by various stakeholders, or risk managers. The analysis focuses on the

  4. On the Risk Management and Auditing of SOA Based Business Processes

    Science.gov (United States)

    Orriens, Bart; Heuvel, Willem-Jan V./D.; Papazoglou, Mike

    SOA-enabled business processes stretch across many cooperating and coordinated systems, possibly crossing organizational boundaries, and technologies like XML and Web services are used for making system-to-system interactions commonplace. Business processes form the foundation for all organizations, and as such, are impacted by industry regulations. This requires organizations to review their business processes and ensure that they meet the compliance standards set forth in legislation. In this paper we sketch a SOA-based service risk management and auditing methodology including a compliance enforcement and verification system that assures verifiable business process compliance. This is done on the basis of a knowledge-based system that allows integration of internal control systems into business processes conform pre-defined compliance rules, monitor both the normal process behavior and those of the control systems during process execution, and log these behaviors to facilitate retrospective auditing.

  5. Study of International Standards of Risk Management

    Directory of Open Access Journals (Sweden)

    Dykan Volodymyr L.

    2014-01-01

    Full Text Available The goal of the article lies in the study of existing international standards of risk management, an important factor of improvement of risk management in domestic corporations and enterprises and development of recommendations on application of international standards in Ukraine, in particular, within the framework of building corporate systems of risk management. The conducted study shows that approaches on organisation of the process of risk management, used in standards of risk management, are of general character and differ with the degree of detailing. Their undoubted value in development of risk management in Ukraine is identification of a general direction of building corporate systems of risk management in practice. The said approaches at the national and corporate levels of standardisation in Ukraine within the framework of building corporate systems of risk management would allow improvement of risk management in corporations and enterprises. The prospect of further studies of domestic specialists in the field of risk management is development of the domestic standard of risk management with consideration of modern domestic specific features of development of risk management in Ukraine and leading foreign experience.

  6. Risk management on the winegrowing farms at Northwest Croatia

    Directory of Open Access Journals (Sweden)

    Hrvoje SMRKULJ

    2016-02-01

    Full Text Available The main goal of this paper was to determine perceptions of risk and risk management strategies by winemakers. Primary research was based on the sample of 38 randomly selected winegrowers in the Croatian northwestern sub region of Zagorje – Međimurje. Winegrowers are relatively unwilling to take risks. In the process of making business decisions most of them rely on their own experience, advices and recommendations learned by attending winegrower association courses together with critics of their customers. Highly evaluated risk sources are health issues (human risks and production risks (weather factors, as well as diseases and pests. As the most important risk management strategies in vineyard production, the winegrowers emphasized: ownership of land and objects, intuition and personal assessment and additionally the various methods of price risk management (marketing and sales policy. Crop insurance is perceived as a relatively important strategy. The main reasons why winegrowers use crop insurance are: regional exposure to extreme climate risks, as well as the unavailability of other management instruments for risk management. In order to improve the quality of insurance services it would be necessary to focus efforts and activities on promoting and developing a better system for agricultural insurance. That would consequently allow enrichment of insurance risk sources palette, but also could have effect on decrease of insurance premiums. Furthermore, in order to become competitive in both, domestic and EU market, there should be developed training programs in the area of risk management. That could have impact on reducing risk aversion in the business activities!

  7. Risk-trading in flood management: An economic model.

    Science.gov (United States)

    Chang, Chiung Ting

    2017-09-15

    Although flood management is no longer exclusively a topic of engineering, flood mitigation continues to be associated with hard engineering options. Flood adaptation or the capacity to adapt to flood risk, as well as a demand for internalizing externalities caused by flood risk between regions, complicate flood management activities. Even though integrated river basin management has long been recommended to resolve the above issues, it has proven difficult to apply widely, and sometimes even to bring into existence. This article explores how internalization of externalities as well as the realization of integrated river basin management can be encouraged via the use of a market-based approach, namely a flood risk trading program. In addition to maintaining efficiency of optimal resource allocation, a flood risk trading program may also provide a more equitable distribution of benefits by facilitating decentralization. This article employs a graphical analysis to show how flood risk trading can be implemented to encourage mitigation measures that increase infiltration and storage capacity. A theoretical model is presented to demonstrate the economic conditions necessary for flood risk trading. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Individual Property Risk Management

    Directory of Open Access Journals (Sweden)

    Michael S. Finke

    2010-01-01

    Full Text Available This paper reviews household property risk management and estimates normatively optimal choice under theoretical assumptions. Although risk retention limits are common in the financial planning industry, estimates of optimal risk retention that include both financial and human wealth far exceed limits commonly recommended. Households appear to frame property losses differently from other wealth losses leading to wealth-reducing, excess risk transfer. Possible theoretical explanations for excess sensitivity to loss are reviewed. Differences between observed and optimal risk management imply a large potential gain from improved choice.

  9. A review of game theory approach to cyber security risk management

    African Journals Online (AJOL)

    A review of game theory approach to cyber security risk management. ... This paper presents a review of game theoretic-based model for cyber security risk management. Specifically, issues on ... AJOL African Journals Online. HOW TO USE ...

  10. Confluence and Contours: Reflexive Management of Environmental Risk.

    Science.gov (United States)

    Soane, Emma; Schubert, Iljana; Pollard, Simon; Rocks, Sophie; Black, Edgar

    2016-06-01

    Government institutions have responsibilities to distribute risk management funds meaningfully and to be accountable for their choices. We took a macro-level sociological approach to understanding the role of government in managing environmental risks, and insights from micro-level psychology to examine individual-level risk-related perceptions and beliefs. Survey data from 2,068 U.K. citizens showed that lay people's funding preferences were associated positively with beliefs about responsibility and trust, yet associations with perception varied depending on risk type. Moreover, there were risk-specific differences in the funding preferences of the lay sample and 29 policymakers. A laboratory-based study of 109 participants examined funding allocation in more detail through iterative presentation of expert information. Quantitative and qualitative data revealed a meso-level framework comprising three types of decisionmakers who varied in their willingness to change funding allocation preferences following expert information: adaptors, responders, and resistors. This research highlights the relevance of integrated theoretical approaches to understanding the policy process, and the benefits of reflexive dialogue to managing environmental risks. © 2015 Society for Risk Analysis.

  11. [The relevance of clinical risk management].

    Science.gov (United States)

    Gulino, Matteo; Vergallo, Gianluca Montanari; Frati, Paola

    2011-01-01

    Medical activity includes a risk of possible injury or complications for the patients, that should drive the Health Care Institutions to introduce and/ or improve clinical Risk management instruments. Although Italy is still lacking a National project of Clinical Risk Management, a number of efforts have been made by different Italian Regions to introduce instruments of risk management. In addition, most of National Health Care Institutions include actually a Department specifically in charge to manage the clinical risk. Despite the practical difficulties, the results obtained until now suggest that the risk management may represent a useful instrument to contribute to the reduction of errors in clinical conduct. Indeed, the introduction of adequate instruments of prevention and management of clinical risk may help to ameliorate the quality of health care Institution services.

  12. Enterprise Content Management Implementation and Risk

    Directory of Open Access Journals (Sweden)

    Jaroslava Klegová

    2015-01-01

    Full Text Available Enterprise Content Management (ECM solutions are commonly used in many areas such as document management, record management, digital asset management, etc. Key features of ECM systems are capturing, indexing, preserving and retrieving of digital information. The state-of-the- art ECM solution can help revolutionize document management and further automated business processes which can lead to better decisions and competitive advantage. Risk management can reduce project failure and that is why controlling risk in ECM implementation projects is considered to be a major contributor to project success. To manage software risk, the first step is to identify a list of ECM projects’ risks. The present paper provides an overview of ECM implementation risks and contains findings from a small survey on experience of ECM implementation and risk in Czech enterprises. Risk of implementation in the public sector is discussed more deeply with case study examples.

  13. Managing perceived operational risk factors for effective supply-chain management

    Science.gov (United States)

    Sylla, Cheickna

    2014-12-01

    This research is part of a large scale comprehensive mathematical and empirical modeling investigation projects aimed at developing a better understanding of supply-chain risk management by offering a comprehensive framework including theoretical elements and empirical evidence based on managers' perception of improved organizational level of preparedness to safeguard against the threats of disruptions, delays and stoppage in the supply chain. More specifically, this paper reports the empirical investigation conducted using 92 companies in several eastern USA regions involved in international trades with global supply chains. Among the 56 general hypotheses investigated, the results support that managers strive to balance their control and decision impacts to mold their responses to risk factors with knowledge of the extent of cost consequences as stated in previous research. However, the results also propose new findings which significantly vary from previous research reports.

  14. Disaster Risk Management and Measurement Indicators for Cultural Heritage in Taiwan

    Science.gov (United States)

    Yen, Y. N.; Cheng, C. F.; Cheng, H. M.

    2015-08-01

    Under the influence of global climate change, the risk preparedness has become a universal issue in different research fields. In the conservation of cultural heritage, disaster risk management is becoming one of the major research topics. Besides researches on the theory and mechanism of disaster risk management, the tools for the performance of site managers to protect cultural heritage is another important issue that needs development. UNESCO and ICOMOS have released some important documents on disaster risk management including its concept, identification, evaluation, mitigation, monitoring and resilience, etc. However, there is a big gap between concept and implementation in Taiwan. Presently there are 2000 monuments in Taiwan that hardly meet the modern code. First, based on international documents released, this research presents 13 disaster indicators on monuments and their environments. Next, 345 monuments in northern Taiwan are taken as examples to evaluate their risk situations with indicators designed in 2011. Some positive recommendations were given at the same time. As a result, a comparative evaluation was completed in 2012 and some key issues are found, such as too many electrical facilities, lack of efficient firefighting equipment, and a shortage of management mechanism, just to name a few. Through the improvement of the management, some major risk can be mitigated. In 2013~14, this research took 23 national monuments from the 345 monuments to evaluate their risk situations and compare the differences between national and local monuments. Results show that almost all management mechanisms in the national monuments have been established and are running well. However, problems like inappropriate electrical facilities and insufficient monitoring equipment remain. In addition, the performance of private monuments is not as good as public ones. Based on the collected information and evaluation, this research develops safety measures of heritage

  15. Credit derivatives and risk management

    OpenAIRE

    Michael S. Gibson

    2007-01-01

    The striking growth of credit derivatives suggests that market participants find them to be useful tools for risk management. I illustrate the value of credit derivatives with three examples. A commercial bank can use credit derivatives to manage the risk of its loan portfolio. An investment bank can use credit derivatives to manage the risks it incurs when underwriting securities. An investor, such as an insurance company, asset manager, or hedge fund, can use credit derivatives to align its...

  16. Quality risk management in pharmaceutical development.

    Science.gov (United States)

    Charoo, Naseem Ahmad; Ali, Areeg Anwer

    2013-07-01

    The objective of ICH Q8, Q9 and Q10 documents is application of systemic and science based approach to formulation development for building quality into product. There is always some uncertainty in new product development. Good risk management practice is essential for success of new product development in decreasing this uncertainty. In quality by design paradigm, the product performance properties relevant to the patient are predefined in target product profile (TPP). Together with prior knowledge and experience, TPP helps in identification of critical quality attributes (CQA's). Initial risk assessment which identifies risks to these CQA's provides impetus for product development. Product and process are designed to gain knowledge about these risks, devise strategies to eliminate or mitigate these risks and meet objectives set in TPP. By laying more emphasis on high risk events the protection level of patient is increased. The process being scientifically driven improves the transparency and reliability of the manufacturer. The focus on risk to the patient together with flexible development approach saves invaluable resources, increases confidence on quality and reduces compliance risk. The knowledge acquired in analysing risks to CQA's permits construction of meaningful design space. Within the boundaries of the design space, variation in critical material characteristics and process parameters must be managed in order to yield a product having the desired characteristics. Specifications based on product and process understanding are established such that product will meet the specifications if tested. In this way, the product is amenable to real time release, since specifications only confirm quality but they do not serve as a means of effective process control.

  17. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  18. Risk management in the electric power sector, v. 16(61)

    International Nuclear Information System (INIS)

    Iliev, Atanas; Minovski, Dragan

    2008-01-01

    This paper presents the basics of the risk theory and the main methods which could be applied for risk management in electrical power system utilities. Taking into consideration that the risk and uncertainty not be completely eliminated, the engineers have to know to manage the risk and uncertainty. The main goal is to minimized the negative effects from accepted risk in order to increase expected incomes and expected profit. Special attention is dedicated to risk management in complex project in Electric Power Systems in a new deregulated electricity market which has the influence to the market stability, expected incomes and quality of the delivered electricity. Specially, the risk management in the companies - producers of the electricity is analysed, since theirs further investments in a rehabilitation of the current power plants as well in the construction of the new plants will be based on the economical principles of profit. (Author)

  19. Risk management in the electric power sector, v. 16(62)

    International Nuclear Information System (INIS)

    Iliev, Atanas; Minovski, Dragan

    2008-01-01

    This paper presents the basics of the risk theory and the main methods which could be applied for risk management in electrical power system utilities. Taking into consideration that the risk and uncertainty not be completely eliminated, the engineers have to know to manage the risk and uncertainty. The main goal is to minimized the negative effects from accepted risk in order to increase expected incomes and expected profit. Special attention is dedicated to risk management in complex project in Electric Power Systems in a new deregulated electricity market which has the influence to the market stability, expected incomes and quality of the delivered electricity. Specially, the risk management in the companies - producers of the electricity is analysed, since theirs further investments in a rehabilitation of the current power plants as well in the construction of the new plants will be based on the economical principles of profit. (Author)

  20. 12 CFR 917.3 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  1. Risk Informed Structural Systems Integrity Management

    DEFF Research Database (Denmark)

    Nielsen, Michael Havbro Faber

    2017-01-01

    The present paper is predominantly a conceptual contribution with an appraisal of major developments in risk informed structural integrity management for offshore installations together with a discussion of their merits and the challenges which still lie ahead. Starting point is taken in a selected...... overview of research and development contributions which have formed the basis for Risk Based Inspection Planning (RBI) as we know it today. Thereafter an outline of the methodical basis for risk informed structural systems integrity management, i.e. the Bayesian decision analysis is provided in summary....... The main focus is here directed on RBI for offshore facilities subject to fatigue damages. New ideas and methodical frameworks in the area of robustness and resilience modeling of structural systems are then introduced, and it is outlined how these may adequately be utilized to enhance Structural Integrity...

  2. GENERAL RISKS AND UNCERTAINTIES OF REPORTING AND MANAGEMENT REPORTING RISKS

    Directory of Open Access Journals (Sweden)

    CAMELIA I. LUNGU

    2011-04-01

    Full Text Available Purpose: Highlighting risks and uncertainties reporting based on a literature review research. Objectives: The delimitation of risk management models and uncertainties in fundamental research. Research method: Fundamental research study directed to identify the relevant risks’ models presented in entities’ financial statements. Uncertainty is one of the fundamental coordinates of our world. As showed J.K. Galbraith (1978, the world now lives under the age of uncertainty. Moreover, we can say that contemporary society development could be achieved by taking decisions under uncertainty, though, risks. Growing concern for the study of uncertainty, its effects and precautions led to the rather recent emergence of a new science, science of hazards (les cindyniques - l.fr. (Kenvern, 1991. Current analysis of risk are dominated by Beck’s (1992 notion that a risk society now exists whereby we have become more concerned about our impact upon nature than the impact of nature upon us. Clearly, risk permeates most aspects of corporate but also of regular life decision-making and few can predict with any precision the future. The risk is almost always a major variable in real-world corporate decision-making, and managers that ignore it are in a real peril. In these circumstances, a possible answer is assuming financial discipline with an appropriate system of incentives.

  3. Hanford Tanks Initiative risk management guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    This project-specific Risk Management Guide describes the general approach and process being used by the HTI Project to manage risk associated with execution of the HTI mission. It includes the initial identification of risk and the quantification of its likelihood and severity of its consequences. It further addresses the formulation of risk mitigation plans, periodic statusing of the Risk Management List, and risk closure

  4. A nuclear power enterprise debt management system construction Based on Sanmen Nuclear Power Co., LTD, debt risk management case analysis

    International Nuclear Information System (INIS)

    Wu Yan; Liu Shuqing

    2010-01-01

    Building nuclear power enterprises need huge investment , often tens of billions RMB. How to do a good job in corporate debt risk management, becoming powerful large-scale development of nuclear power ,ensuring the supply of funds and existing debt service in the process of large-scale development of nuclear power ,is an important task. In this paper, managing the company's debt is very urgent and necessary through analysis of SMNPC financing and debt structure; through the analysis of SMNPC's debt risk management , the authors would like to explore how to build up the framework of the debt management under the large-scale development of nuclear power construction . Nuclear power enterprises need to strengthen supervision mechanism and internal control,build-up and perfect all-round debt risk manage system, keep watch on debt risk in order to ensure preservation and increment of the value of state assets. (authors)

  5. Adaptive risk management using new risk perspectives – an example from the oil and gas industry

    International Nuclear Information System (INIS)

    Bjerga, Torbjørn; Aven, Terje

    2015-01-01

    This article discusses management of risk in the case of large uncertainties and the use of adaptive risk management in such situations. This type of management is based on the acknowledgement that one best decision cannot be made, but rather, a set of alternatives should be dynamically tracked to gain information and knowledge about the effects of different courses of action. In the article, we study a case from the oil and gas industry, the main aim being to gain insights into how adaptive risk management could be implemented when giving due attention to the knowledge and uncertainty aspects of risk. In recent years, several authors have argued for the adoption of some new types of risk perspectives, which highlight uncertainties and knowledge in the way risk is understood and measured — this article uses these perspectives as the basis for the discussion. - Highlights: • Demonstrates a new perspective on adaptive risk management. • The perspective highlights uncertainty and knowledge, not only probability. • Illustrates the perspective on an oil and gas case, which is characterized by deep uncertainties

  6. Enterprise risk management and disclosure

    Directory of Open Access Journals (Sweden)

    Nicoleta Farcane

    2008-01-01

    Full Text Available Our paper deals with aspects regarding risk and uncertainty. Many risk management methods are today implemented in organizations. This perspective reveals that managers are linked in different forms to the activities they are managing, depending on the conditions and levels of uncertainty they are in. Actually, these multiple levels of uncertainty lead to the conclusion that any situation in an organizational system can be classified in two different models of organizational phenomena: the organizational phenomena that are putting managers and stakeholders in conditions of risk and the organizational phenomena that are putting them in condition of uncertainty. Using content analyze in this paper we survey the disclosure level of risk management information in the annual report of top Romanian listed companies.

  7. At your own risk. An inquiry about risk management in the ESI

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The UNIPEDE survey on Risk Management within the Electricity Supply Industry has provided a picture of the risks facing the Industry at present and an insight into the management of tomorrow's risks. The survey, in which 81 companies (85 respondents) from 31 countries took part shows that: nearly all types of risk identified in the questionnaire are perceived to be growing : the Risk Management role has become more centralized over the past three years: change will slow in the coming three ; the amount of top level attention given to Risk Management is increasing. However only 37 % of respondent companies have Risk Management as a regular top level management item ; environment-related risks and the safety of both employees and the public are perceived as the most critical risks facing the Industry. Over 80 % of surveyed companies consider that both are of increasing concern ; almost 90 % of respondents agreed that risk management processes should be implemented for both pure and speculative risks. Those who disagreed maintained that Risk Management should be 'realistic not theoretical' ; respondents from the US gave markedly different answers to those from the rest of the world. Risk Management in the US receives top level attention, with numerous separated risk management departments handling risk strategy

  8. Automated Risk Control in Medical Imaging Equipment Management Using Cloud Application

    Directory of Open Access Journals (Sweden)

    Sally M. Ghanem

    2018-01-01

    Full Text Available Medical imaging equipment (MIE is the baseline of providing patient diagnosis in healthcare facilities. However, that type of equipment poses high risk for patients, operators, and environment in terms of technology and application. Considering risk management in MIE management is rarely covered in literature. The study proposes a methodology that controls risks associated with MIE management. The methodology is based on proposing a set of key performance indicators (KPIs that lead to identify a set of undesired events (UDEs, and through a risk matrix, a risk level is evaluated. By using cloud computing software, risks could be controlled to be manageable. The methodology was verified by using a data set of 204 pieces of MIE along 104 hospitals, which belong to Egyptian Ministry of Health. Results point to appropriateness of proposed KPIs and UDEs in risk evaluation and control. Thus, the study reveals that optimizing risks taking into account the costs has an impact on risk control of MIE management.

  9. Managing information technology security risk

    Science.gov (United States)

    Gilliam, David

    2003-01-01

    Information Technology (IT) Security Risk Management is a critical task for the organization to protect against the loss of confidentiality, integrity and availability of IT resources. As systems bgecome more complex and diverse and and attacks from intrusions and malicious content increase, it is becoming increasingly difficult to manage IT security risk. This paper describes a two-pronged approach in addressing IT security risk and risk management in the organization: 1) an institutional enterprise appraoch, and 2) a project life cycle approach.

  10. Portfolio management fees: assets or profits based compensation?

    OpenAIRE

    Gil-Bazo, Javier

    2001-01-01

    This paper compares assets-based portfolio management fees to profits-based fees. Whilst both forms of compensation can provide appropriate risk incentives, fund managers' limited liability induces more excess risk-taking under a profits-based fee contract. On the other hand, an assets-based fee is more costly to investors. In Spain, where the law explicitly permits both forms of retribution, assets-based fees are observed far more frequently. Under this type of compensation, the paper provid...

  11. Effects of risk attitudes on extended attack fire management decisionmaking

    Science.gov (United States)

    Donald G. MacGregor; Armando González-Cabán

    2009-01-01

    Fire management inherently involves the assessment and management of risk, and decision making under uncertainty. Although organizational standards and guides are an important determinant of how decision problems are structured and framed, decision makers may view risk-based decisions from a perspective that is unique to their background and experience. Previous...

  12. Tank waste remediation system risk management list

    International Nuclear Information System (INIS)

    Collard, L.B.

    1995-01-01

    The Tank Waste Remedation System (TWRS) Risk Management List and it's subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists

  13. Risk management versus incentives

    International Nuclear Information System (INIS)

    Aven, E.; Lovas, K.; Osmundsen, P.

    2006-01-01

    Portfolio theory indicates that risk management should take place at the group level. Hedging at the project level or in the individual business areas may lead to suboptimal results. However, the efficiency of a profit centre depends on its management's being able to influence factors that are crucial to the unit's financial results. Price hedging could be one such factor. In the wider perspective, this constitutes part of the balancing between centralisation and decentralisation. This article covers important elements of risk management and incentive design. It goes on to discuss the balancing of overall risk management at the group level and incentive design in profit centres and corporate units. Throughout the article, the oil industry serves as a case. (author)

  14. Explore the Application of Financial Engineering in the Management of Exchange Rate Risk

    Directory of Open Access Journals (Sweden)

    Yang Liu

    2015-01-01

    Full Text Available In the background where the domestic enterprises commonly have a weak protection consciousness against the exchange rate risk, this article makes a deep analysis based on the definition of exchange rate risk and its cause. By comparison of the traditional management method of exchange rate risk with another one based on financial engineering tools, it also deeply analyzes the method to use the financial engineering technology in the management of exchange rate risk, and concludes the primary purpose of exchange rate risk management is for hedging. This article proposes an optimal analysis method in two aspects, namely the minimum risk and maximum efficiency, for the forward-based optimal hedging, and proposes an optimal analysis method of dynamic hedging for the optimal hedging of option-based tools. Based on the description of the application of financial tools in foreign exchange futures, forward contract, currency exchange and foreign exchange option, it makes an empirical analysis on the management of foreign exchange risk by taking an assumed T company as the carrier and based on the trading tools of forward foreign exchange and currency option, which describes the operation procedure of financial tools in a more direct way and proves the efficiency of the optimal analysis method of this article.

  15. Risk Management Practices by Barbadian Banks

    Directory of Open Access Journals (Sweden)

    Anthony Wood

    2013-07-01

    The main findings of the paper are: risk managers perceive risk management as critical to their banks’ performance; the types of risks causing the greatest exposures are credit risk, operational risk, country/sovereign risk, interest rate risk and market risk; there was a high level of success with current risk management practices and these practices have evolved over time in line with the changing economic environment and regulatory updates. Overall, the findings suggest strongly that in light of the current depressed economic climate, banks operating in Barbados are indeed risk-focused or might we say “risk intelligent”.

  16. A scenario-based modeling approach for emergency evacuation management and risk analysis under multiple uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Lv, Y., E-mail: lvyying@hotmail.com [School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044 (China); Faculty of Engineering and Applied Science, University of Regina, Regina, Saskatchewan S4S 0A2 (Canada); Huang, G.H., E-mail: huang@iseis.org [Faculty of Engineering and Applied Science, University of Regina, Regina, Saskatchewan S4S 0A2 (Canada); Guo, L., E-mail: guoli8658@hotmail.com [Faculty of Engineering and Applied Science, University of Regina, Regina, Saskatchewan S4S 0A2 (Canada); Li, Y.P., E-mail: yongping.li@iseis.org [MOE Key Laboratory of Regional Energy and Environmental Systems Optimization, Resources and Environmental Research Academy, North China Electric Power University, Beijing 102206 (China); Dai, C., E-mail: daichao321@gmail.com [College of Environmental Sciences and Engineering, Peking University, Beijing 100871 (China); Wang, X.W., E-mail: wangxingwei0812@gamil.com [State Key Laboratory of Water Environment Simulation, School of Environment, Beijing Normal University, Beijing 100875 (China); Sun, W., E-mail: sunwei@iseis.org [Faculty of Engineering and Applied Science, University of Regina, Regina, Saskatchewan S4S 0A2 (Canada)

    2013-02-15

    Highlights: ► An interval-parameter joint-probabilistic integer programming method is developed. ► It is useful for nuclear emergency management practices under uncertainties. ► It can schedule optimal routes with maximizing evacuees during a finite time. ► Scenario-based analysis enhances robustness in controlling system risk. ► The method will help to improve the capability of disaster responses. -- Abstract: Nuclear emergency evacuation is important to prevent radioactive harms by hazardous materials and to limit the accidents’ consequences; however, uncertainties are involved in the components and processes of such a management system. In the study, an interval-parameter joint-probabilistic integer programming (IJIP) method is developed for emergency evacuation management under uncertainties. Optimization techniques of interval-parameter programming (IPP) and joint-probabilistic constrained (JPC) programming are incorporated into an integer linear programming framework, so that the approach can deal with uncertainties expressed as joint probability and interval values. The IJIP method can schedule the optimal routes to guarantee the maximum population evacuated away from the effected zone during a finite time. Furthermore, it can also facilitate post optimization analysis to enhance robustness in controlling system violation risk imposed on the joint-probabilistic constraints. The developed method has been applied to a case study of nuclear emergency management; meanwhile, a number of scenarios under different system conditions have been analyzed. It is indicated that the solutions are useful for evacuation management practices. The result of the IJIP method can not only help to raise the capability of disaster responses in a systematic manner, but also provide an insight into complex relationships among evacuation planning, resources utilizations, policy requirements and system risks.

  17. Probabilistic risk assessment as an aid to risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1982-01-01

    Probabilistic risk assessments are providing important insights into nuclear power plant safety. Their value is two-fold: first as a means of quantifying nuclear plant risk including contributors to risk, and second as an aid to risk management. A risk assessment provides an analytical plant model that can be the basis for performing meaningful decision analyses for controlling safety. It is the aspect of quantitative risk management that makes probabilistic risk assessment an important technical discipline of the future

  18. INTERNAL AUDIT AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Elena RUSE

    2014-04-01

    Full Text Available The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (unchance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities internal audit department aims to improve performance management, enterprise performance and thus improve the internal control system. This paper aims to demonstrate, among other things, that any event that may result in failure is unquestionably classified as risk.

  19. Branding and the Risk Management Imperative

    OpenAIRE

    Fournier Susan; Srinivasan Shuba

    2018-01-01

    In an increasingly risky socioeconomic environment, management needs to proactively consider brand-related risks. To understand brands as tools for risk management, they need to understand four types of brand risk: brand reputation risk, brand dilution risk, brand cannibalization risk and brand stretch risk.

  20. ASME nuclear codes and standards risk management strategic planning

    International Nuclear Information System (INIS)

    Hill, Ralph S. III; Balkey, Kenneth R.; Erler, Bryan A.; Wesley Rowley, C.

    2007-01-01

    This paper is prepared in honor and in memory of the late Professor Emeritus Yasuhide Asada to recognize his contributions to ASME Nuclear Codes and Standards initiatives, particularly those related to risk-informed technology and System Based Code developments. For nearly two decades, numerous risk-informed initiatives have been completed or are under development within the ASME Nuclear Codes and Standards organization. In order to properly manage the numerous initiatives currently underway or planned for the future, the ASME Board on Nuclear Codes and Standards (BNCS) has an established Risk Management Strategic Plan (Plan) that is maintained and updated by the ASME BNCS Risk Management Task Group. This paper presents the latest approved version of the plan beginning with a background of applications completed to date, including the recent probabilistic risk assessment (PRA) standards developments for nuclear power plant applications. The paper discusses planned applications within ASME Nuclear Codes and Standards that will require expansion of the ASME PRA Standard to support new advanced light water reactor and next generation reactor developments, such as for high temperature gas-cooled reactors. Emerging regulatory developments related to risk-informed, performance- based approaches are summarized. A long-term vision for the potential development and evolution to a nuclear systems code that adopts a risk-informed approach across a facility life-cycle (design, construction, operation, maintenance, and closure) is also summarized. Finally, near term and long term actions are defined across the ASME Nuclear Codes and Standards organizations related to risk management, including related U.S. regulatory activities. (author)

  1. 42 CFR 441.476 - Risk management.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  2. Application of risk-based multiple criteria decision analysis for selection of the best agricultural scenario for effective watershed management.

    Science.gov (United States)

    Javidi Sabbaghian, Reza; Zarghami, Mahdi; Nejadhashemi, A Pouyan; Sharifi, Mohammad Bagher; Herman, Matthew R; Daneshvar, Fariborz

    2016-03-01

    Effective watershed management requires the evaluation of agricultural best management practice (BMP) scenarios which carefully consider the relevant environmental, economic, and social criteria involved. In the Multiple Criteria Decision-Making (MCDM) process, scenarios are first evaluated and then ranked to determine the most desirable outcome for the particular watershed. The main challenge of this process is the accurate identification of the best solution for the watershed in question, despite the various risk attitudes presented by the associated decision-makers (DMs). This paper introduces a novel approach for implementation of the MCDM process based on a comparative neutral risk/risk-based decision analysis, which results in the selection of the most desirable scenario for use in the entire watershed. At the sub-basin level, each scenario includes multiple BMPs with scores that have been calculated using the criteria derived from two cases of neutral risk and risk-based decision-making. The simple additive weighting (SAW) operator is applied for use in neutral risk decision-making, while the ordered weighted averaging (OWA) and induced OWA (IOWA) operators are effective for risk-based decision-making. At the watershed level, the BMP scores of the sub-basins are aggregated to calculate each scenarios' combined goodness measurements; the most desirable scenario for the entire watershed is then selected based on the combined goodness measurements. Our final results illustrate the type of operator and risk attitudes needed to satisfy the relevant criteria within the number of sub-basins, and how they ultimately affect the final ranking of the given scenarios. The methodology proposed here has been successfully applied to the Honeyoey Creek-Pine Creek watershed in Michigan, USA to evaluate various BMP scenarios and determine the best solution for both the stakeholders and the overall stream health. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. Gambling in Latin: incorporating uncertainty in risk management

    Energy Technology Data Exchange (ETDEWEB)

    Gratt, L.B.; Levin, L. (IWG Corporation, San Diego, CA (United States))

    1994-08-01

    Risk assessment uses assumptions based on differing degrees of conservatism. This complicates the understanding of the uncertainty in the final risk estimate. Uncertainties arise from each component of the risk assessment process: source terms, atmospheric transport, exposure, and dose response. Probabilistic modeling using Monte Carlo and Latin Square sampling techniques (reference to Gambling in Latin) allows for an improved approach to risk assessment and management. 16 refs., 1 fig., 1 tab.

  4. Research on Occupational Safety, Health Management and Risk Control Technology in Coal Mines.

    Science.gov (United States)

    Zhou, Lu-Jie; Cao, Qing-Gui; Yu, Kai; Wang, Lin-Lin; Wang, Hai-Bin

    2018-04-26

    This paper studies the occupational safety and health management methods as well as risk control technology associated with the coal mining industry, including daily management of occupational safety and health, identification and assessment of risks, early warning and dynamic monitoring of risks, etc.; also, a B/S mode software (Geting Coal Mine, Jining, Shandong, China), i.e., Coal Mine Occupational Safety and Health Management and Risk Control System, is developed to attain the aforementioned objectives, namely promoting the coal mine occupational safety and health management based on early warning and dynamic monitoring of risks. Furthermore, the practical effectiveness and the associated pattern for applying this software package to coal mining is analyzed. The study indicates that the presently developed coal mine occupational safety and health management and risk control technology and the associated software can support the occupational safety and health management efforts in coal mines in a standardized and effective manner. It can also control the accident risks scientifically and effectively; its effective implementation can further improve the coal mine occupational safety and health management mechanism, and further enhance the risk management approaches. Besides, its implementation indicates that the occupational safety and health management and risk control technology has been established based on a benign cycle involving dynamic feedback and scientific development, which can provide a reliable assurance to the safe operation of coal mines.

  5. Methods of Financial Risk Management

    Directory of Open Access Journals (Sweden)

    Korzh Natalia

    2016-10-01

    Full Text Available The essence and nature of financial risks are investigated. Their classification is conducted. The features of financial risk management and the main methods of management are considered. The ways of risk compensation are identified. It is proved that the objective external risk basis is such market imperfections as externalities of enterprises and incomplete information about the operation of the business environment and internal objective basis risk – the objective function to maximise profits in a competitive environment. It is revealed that to compensate market imperfections business entities should develop a strategy that combines fill in missing information and neutralise or minimise externalities that tactically implemented in financial risk management programs.

  6. A Systematical Framework of Schedule Risk Management for Power Grid Engineering Projects’ Sustainable Development

    Directory of Open Access Journals (Sweden)

    Rao Rao

    2014-10-01

    Full Text Available Schedule risks are the main threat for high efficiency of schedule management in power grid engineering projects (PGEP. This paper aims to build a systematical framework for schedule risk management, which consists of three dimensions, including the personnel dimension, method dimension and time dimension, namely supervisory personnel, management methods and the construction process, respectively. Responsibilities of staff with varied functions are discussed in the supervisory personnel part, and six stages and their corresponding 40 key works are ensured as the time dimension. Risk identification, analysis, evaluation and prevention together formed the method dimension. Based on this framework, 222 schedule risks occur in the whole process of PGEPs are identified via questionnaires and expert interviews. Then, the relationship among each risk is figured out based on the Interpretative Structure Model (ISM method and the impact of each risk is quantitatively assessed by establishing evaluation system. The actual practice of the proposed framework is verified through the analysis of the first stage of a PGEP. Finally, the results show that this framework of schedule risk management is meaningful for improving the efficiency of project management. It provides managers with a clearer procedure with which to conduct risk management, helps them to timely detect risks and prevent risks from occurring. It is also easy for managers to judge the influence level of each risk, so they can take actions based on the level of each risk’s severity. Overall, it is beneficial for power grid enterprises to achieve a sustainable management.

  7. Risk Management and Risk Psychology in Romanian Sme’s

    Directory of Open Access Journals (Sweden)

    Irina Dănciulescu

    2015-12-01

    Full Text Available Risk is one of the biggest and most fascinating challenges of all times for humanity, because of its presence in all fields. Risk management as a component of modern management, has become a main concern for the modern world and one of the “key mechanisms” of economic development, a complex processn that includes a series of activities meant to alleviate the impact of risk over business and planed or foreseen results. This paper wants to bring to attention the importance of risks and their management in today’s economic crisis. The sector presented is the IT& C, especially software, because Romania had a growth in this area for a few years but beginning the crisis this segment in economy had known a serious decrease. This paper tries to connect risk management and risk psychology to Romanian economy, culture and mentality. The paper presents in short some of risk management characteristics, definitions and few opinions; why in Romania this subject is not treated with the appropriate attention. The paper at hand focuses on the psychology of risk and how it affects the life of individuals and the existence of companies, the importance it should have on day to day basis, especially in Romania

  8. Risk management model of winter navigation operations

    International Nuclear Information System (INIS)

    Valdez Banda, Osiris A.; Goerlandt, Floris; Kuzmin, Vladimir; Kujala, Pentti; Montewka, Jakub

    2016-01-01

    The wintertime maritime traffic operations in the Gulf of Finland are managed through the Finnish–Swedish Winter Navigation System. This establishes the requirements and limitations for the vessels navigating when ice covers this area. During winter navigation in the Gulf of Finland, the largest risk stems from accidental ship collisions which may also trigger oil spills. In this article, a model for managing the risk of winter navigation operations is presented. The model analyses the probability of oil spills derived from collisions involving oil tanker vessels and other vessel types. The model structure is based on the steps provided in the Formal Safety Assessment (FSA) by the International Maritime Organization (IMO) and adapted into a Bayesian Network model. The results indicate that ship independent navigation and convoys are the operations with higher probability of oil spills. Minor spills are most probable, while major oil spills found very unlikely but possible. - Highlights: •A model to assess and manage the risk of winter navigation operations is proposed. •The risks of oil spills in winter navigation in the Gulf of Finland are analysed. •The model assesses and prioritizes actions to control the risk of the operations. •The model suggests navigational training as the most efficient risk control option.

  9. MANAGEMENT OF SECURITY FOR BANK LOANS ON THE BASIS OF RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Viktoriia Kovalenko

    2016-03-01

    Full Text Available The article aims to study methods and tools for risk management to ensure bank loans.  Proved that the effectiveness of risk management to ensure bank loans depends on consistency,  adequacy methods of evaluation, quality monitoring and timely response system of the banks and the  regulator. The article is to develop recommendations to improve the effectiveness of risk management providing bank loans considering the risks inherent in the process support mortgage portfolio of banks in the  face of considerable uncertainty functioning banks. It is proved that the risk provision of bank loans in the loan management should be considered  through risk characteristics that form the aggregate credit risk. Substantiated that risk management software meets the classic risk management, which identifies  four main stages: identification; risk assessment software; control risk; minimizing risk. Keywords: credit risk provision, loan, risk management, reserves.JEL: G 28

  10. Managing Cardiovascular Disease Risk in Rheumatoid Arthritis: Clinical Updates and Three Strategic Approaches.

    Science.gov (United States)

    Chodara, Ann M; Wattiaux, Aimée; Bartels, Christie M

    2017-04-01

    ᅟ: The increase in cardiovascular disease (CVD) risk in rheumatoid arthritis (RA) is well known; however, appropriate management of this elevated risk in rheumatology clinics is less clear. By critically reviewing literature published within the past 5 years, we aim to clarify current knowledge and gaps regarding CVD risk management in RA. We examine recent guidelines, recommendations, and evidence and discuss three approaches: (1) RA-specific management including treat-to-target and medication management, (2) assessment of comprehensive individual risk, and (3) targeting traditional CVD risk factors (hypertension, smoking, hyperlipidemia, diabetes, obesity, and physical inactivity) at a population level. Considering that 75% of US RA visits occur in specialty clinics, further research is needed regarding evidence-based strategies to manage and reduce CVD risk in RA. This review highlights clinical updates including US cardiology and international professional society guidelines, successful evidence-based population approaches from primary care, and novel opportunities in rheumatology care to reduce CVD risk in RA.

  11. Branding and the Risk Management Imperative

    Directory of Open Access Journals (Sweden)

    Fournier Susan

    2018-05-01

    Full Text Available In an increasingly risky socioeconomic environment, management needs to proactively consider brand-related risks. To understand brands as tools for risk management, they need to understand four types of brand risk: brand reputation risk, brand dilution risk, brand cannibalization risk and brand stretch risk.

  12. Towards risk-based drought management in the Netherlands: quantifying the welfare effects of water shortage

    Science.gov (United States)

    van der Vat, Marnix; Femke, Schasfoort; Rhee Gigi, Van; Manfred, Wienhoven; Nico, Polman; Joost, Delsman; den Hoek Paul, Van; Maat Judith, Ter; Marjolein, Mens

    2016-04-01

    It is widely acknowledged that drought management should move from a crisis to a risk-based approach. A risk-based approach to managing water resources requires a sound drought risk analysis, quantifying the probability and impacts of water shortage due to droughts. Impacts of droughts are for example crop yield losses, hydropower production losses, and water shortage for municipal and industrial use. Many studies analyse the balance between supply and demand, but there is little experience in translating this into economic metrics that can be used in a decision-making process on investments to reduce drought risk. We will present a drought risk analysis method for the Netherlands, with a focus on the underlying economic method to quantify the welfare effects of water shortage for different water users. Both the risk-based approach as well as the economic valuation of water shortage for various water users was explored in a study for the Dutch Government. First, an historic analysis of the effects of droughts on revenues and prices in agriculture as well as on shipping and nature was carried out. Second, a drought risk analysis method was developed that combines drought hazard and drought impact analysis in a probabilistic way for various sectors. This consists of a stepwise approach, from water availability through water shortage to economic impact, for a range of drought events with a certain return period. Finally, a local case study was conducted to test the applicability of the drought risk analysis method. Through the study, experience was gained into integrating hydrological and economic analyses, which is a prerequisite for drought risk analysis. Results indicate that the risk analysis method is promising and applicable for various sectors. However, it was also found that quantification of economic impacts from droughts is time-consuming, because location- and sector-specific data is needed, which is not always readily available. Furthermore, for some

  13. Risk assessment and management logistics chains

    Directory of Open Access Journals (Sweden)

    Vladimir Vikulov

    2014-03-01

    Full Text Available Background: In the context of economic globalization and increasing complexity of economic relations enterprises need methods and techniques to improve and sustain their position on the global market. Integration processes offer business new opportunities, but at the same time present new challenges for the management, including the key objectives of the risk management. Method: On the basis of analysis tools known from the pertinent literature (Supply Chain Management and Supply Chain Risk Management methods, methods of probability theory, methods of risk management, methods of statistics the authors of this paper proposed their own risk assessment method and the method of management of logistics chains. The proposed tool is a specific hybrid of solutions known from the literature. Results: The presented method has been successfully used within the frames of economic-mathematical model of industrial enterprises. Indicators of supply chain risks, including risks caused by supplier are considered in this paper. Authors formed a method of optimizing the level of supply chain risk in the integration with suppliers and customers. Conclusion: Every organization, which starting the process of integration with supplier and customers, needs to use tools, methodologies and techniques for identification of "weak links" in the supply chain. The proposed method allows to fix risk origin places in various links of the supply chain and to identify "weak links" of a logistic chain that may occur in the future. The method is a useful tool for managing not only risks and risk situations, but also to improve the efficiency of current assets management by providing the ability to optimize the level of risk in the current assets management of the industrial enterprise.

  14. Reflecting Societal Values in Designing Flood Risk Management Strategies

    Directory of Open Access Journals (Sweden)

    Adamson Mark

    2016-01-01

    Full Text Available In 2006, the Office of Public Works (OPW began the National Catchment-based Flood Risk Assessment and Management (CFRAM Programme through a series of pilot studies. A Multi-Criteria Analysis (MCA Framework was developed through the pilot studies that integrated a number of objectives related to a wide range of potential impacts and benefits into the core of process of appraising and selecting suitable flood risk management measures for a given area or location, and then for prioritising national investments for different schemes and projects. This MCA Framework, that provides a systematic process of developing a non-monetised but numerical indicator of benefit and impact, has since been implemented nationally in the preparation of the Flood Risk Management Plans (FRMPs. A key feature of the MCA is that it should represent societal values. To this end, nationally representative quantitative research was undertaken to determine global weights that reflect the perceived importance of each of the objectives for reducing economic, social and environmental / cultural risks in flood management strategies. Saaty’s Analytical Hierarchy Process (AHP, in conjunction with a pair-wise comparison of criteria relating to these risks, was utilised to determine weights. In excess of 1,000 structured interviews were completed where the relative importance of these objectives were assessed using a seven-point scale. The weighting given to each of the 13 specific objectives identified broadly followed expectations, with risk to people followed by risk to homes and properties being respectively the first and second most important, although some were given greater or less weighting than expected. The national application of the MCA Framework, using the weighted objectives based on this process, through the CFRAM Programme has generally lead to the identification of appropriate and, based on local consultation, acceptable options for each community.

  15. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  16. Risk management strategy to increase the safety of workers in the nanomaterials industry

    Energy Technology Data Exchange (ETDEWEB)

    Ling, Min-Pei, E-mail: lingmp@mail.cmu.edu.tw [Department of Health Risk Management, China Medical University, Taichung 40402, Taiwan, ROC (China); Lin, Wei-Chao; Liu, Chia-Chyuan [Department of Cosmetic Science, Chia Nan University of Pharmacy and Science, Tainan 71710, Taiwan, ROC (China); Huang, Yi-Shiao; Chueh, Miao-Ju [Industrial Safety and Health Association of the ROC, Taipei 11670, Taiwan, ROC (China); Shih, Tung-Sheng [Institute of Occupational Safety and Health, Council of Labor Affairs, Taipei 22143, Taiwan, ROC (China)

    2012-08-30

    Highlights: Black-Right-Pointing-Pointer On-site assessment of nanomaterials using physiochemical and cytotoxic analysis can help identify risks for each nanomaterials manufacturing plant. Black-Right-Pointing-Pointer The risk of the nanomaterials manufacturing plants can be divided into three levels based on exposure routes (tier 1), aspect identification (tier 2), and toxicological screening (tier 3). Black-Right-Pointing-Pointer According to the different risk levels, the precautionary risk management (PRM) such as technology control, engineering control, and personal protective equipment were applied. Black-Right-Pointing-Pointer The PRM strategy can be effectively reduced workers risks for nanomaterial industries. - Abstract: In recent years, many engineered nanomaterials (NMs) have been produced, but increasing research has revealed that these may have toxicities far greater than conventional materials and cause significant adverse health effects. At present, there is insufficient data to determine the permissible concentrations of NMs in the workplace. There is also a lack of toxicity data and environmental monitoring results relating to complete health risk assessment. In view of this, we believe that workers in the NMs industry should be provided with simple and practical risk management strategy to ensure occupational health and safety. In this study, we developed a risk management strategy based on the precautionary risk management (PRM). The risk of the engineered NMs manufacturing plants can be divided into three levels based on aspect identification, solubility tests, dermal absorption, and cytotoxic analyses. The risk management strategies include aspects relating to technology control, engineering control, personal protective equipment, and monitoring of the working environment for each level. Here we report the first case in which a simple and practical risk management strategy applying in specific engineered NMs manufacturing plants. We are

  17. Risk management strategy to increase the safety of workers in the nanomaterials industry

    International Nuclear Information System (INIS)

    Ling, Min-Pei; Lin, Wei-Chao; Liu, Chia-Chyuan; Huang, Yi-Shiao; Chueh, Miao-Ju; Shih, Tung-Sheng

    2012-01-01

    Highlights: ► On-site assessment of nanomaterials using physiochemical and cytotoxic analysis can help identify risks for each nanomaterials manufacturing plant. ► The risk of the nanomaterials manufacturing plants can be divided into three levels based on exposure routes (tier 1), aspect identification (tier 2), and toxicological screening (tier 3). ► According to the different risk levels, the precautionary risk management (PRM) such as technology control, engineering control, and personal protective equipment were applied. ► The PRM strategy can be effectively reduced workers risks for nanomaterial industries. - Abstract: In recent years, many engineered nanomaterials (NMs) have been produced, but increasing research has revealed that these may have toxicities far greater than conventional materials and cause significant adverse health effects. At present, there is insufficient data to determine the permissible concentrations of NMs in the workplace. There is also a lack of toxicity data and environmental monitoring results relating to complete health risk assessment. In view of this, we believe that workers in the NMs industry should be provided with simple and practical risk management strategy to ensure occupational health and safety. In this study, we developed a risk management strategy based on the precautionary risk management (PRM). The risk of the engineered NMs manufacturing plants can be divided into three levels based on aspect identification, solubility tests, dermal absorption, and cytotoxic analyses. The risk management strategies include aspects relating to technology control, engineering control, personal protective equipment, and monitoring of the working environment for each level. Here we report the first case in which a simple and practical risk management strategy applying in specific engineered NMs manufacturing plants. We are confident that our risk management strategy can be effectively reduced engineered NM industries risks for

  18. Meteorological risks as drivers of innovation for agroecosystem management

    Science.gov (United States)

    Gobin, Anne; Van de Vyver, Hans; Zamani, Sepideh; Curnel, Yannick; Planchon, Viviane; Verspecht, Ann; Van Huylenbroeck, Guido

    2015-04-01

    Devastating weather-related events recorded in recent years have captured the interest of the general public in Belgium. The MERINOVA project research hypothesis is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management which is being tested using a "chain of risk" approach. The major objectives are to (1) assess the probability of extreme meteorological events by means of probability density functions; (2) analyse the extreme events impact of on agro-ecosystems using process-based bio-physical modelling methods; (3) identify the most vulnerable agro-ecosystems using fuzzy multi-criteria and spatial analysis; (4) uncover innovative risk management and adaptation options using actor-network theory and economic modelling; and, (5) communicate to research, policy and practitioner communities using web-based techniques. Generalized Extreme Value (GEV) theory was used to model annual rainfall maxima based on location-, scale- and shape-parameters that determine the centre of the distribution, the deviation of the location-parameter and the upper tail decay, respectively. Likewise the distributions of consecutive rainy days, rainfall deficits and extreme 24-hour rainfall were modelled. Spatial interpolation of GEV-derived return levels resulted in maps of extreme precipitation, precipitation deficits and wet periods. The degree of temporal overlap between extreme weather conditions and sensitive periods in the agro-ecosystem was determined using a bio-physically based modelling framework that couples phenological models, a soil water balance, crop growth and environmental models. 20-year return values were derived for frost, heat stress, drought, waterlogging and field access during different sensitive stages for different arable crops. Extreme yield values were detected from detrended long term arable yields and relationships were found with soil moisture conditions, heat stress or other meteorological variables during the

  19. Tacking Flood Risk from Watersheds using a Natural Flood Risk Management Toolkit

    Science.gov (United States)

    Reaney, S. M.; Pearson, C.; Barber, N.; Fraser, A.

    2017-12-01

    In the UK, flood risk management is moving beyond solely mitigating at the point of impact in towns and key infrastructure to tackle problem at source through a range of landscape based intervention measures. This natural flood risk management (NFM) approach has been trailed within a range of catchments in the UK and is moving towards being adopted as a key part of flood risk management. The approach offers advantages including lower cost and co-benefits for water quality and habitat creation. However, for an agency or group wishing to implement NFM within a catchment, there are two key questions that need to be addressed: Where in the catchment to place the measures? And how many measures are needed to be effective? With this toolkit, these questions are assessed with a two-stage workflow. First, SCIMAP-Flood gives a risk based mapping of likely locations that contribute to the flood peak. This tool uses information on land cover, hydrological connectivity, flood generating rainfall patterns and hydrological travel time distributions to impacted communities. The presented example applies the tool to the River Eden catchment, UK, with 5m grid resolution and hence provide sub-field scale information at the landscape extent. SCIMAP-Flood identifies sub-catchments where physically based catchment hydrological simulation models can be applied to test different NFM based mitigation measures. In this example, the CRUM3 catchment hydrological model has been applied within an uncertainty framework to consider the effectiveness of soil compaction reduction and large woody debris dams within a sub-catchment. It was found that large scale soil aeration to reduce soil compaction levels throughout the catchment is probably the most useful natural flood management measure for this catchment. NFM has potential for wide-spread application and these tools help to ensure that the measures are correctly designed and the scheme performance can be quantitatively assessed and predicted.

  20. Records management and risk management at Kenya Commercial Bank Limited, Nairobi

    Directory of Open Access Journals (Sweden)

    Cleophas Ambira

    2011-03-01

    Full Text Available Background: This paper reported empirical research findings of an MPhil in Information Sciences (Records and Archives Management study conducted at Moi University in Eldoret, Kenya between September 2007 and July 2009.Objectives: The aim of the study was to investigate records management and risk management at Kenya Commercial Bank (KCB Ltd, in the Nairobi area and propose recommendations to enhance the functions of records and risk management at KCB. The specific objectives of the study were to, (1 establish the nature and type of risks to which KCB is exposed, (2 conduct business process analysis and identify the records generated by KCB, (3 establish the extent to which records management is emphasised within KCB as a tool to managing risk, (4 identify which vital records of KCB need protection because of their nature and value to the bank and (5 make recommendations to enhance current records management practices to support the function of risk management in KCB.Method: The study was qualitative. Data were collected through face-to-face interviews. The theoretical framework of the study involved triangulation of the records continuum model by Frank Upward (1980 and the integrated risk management model by the Government of Canada (2000.Results: The key findings of the study were, (1 KCB is exposed to a wide range of risks by virtue of its business, (2 KCB generates a lot of records in the course of its business activities and (3 there are inadequate records management practices and systems, the lack of which undermines the risk management function.Conclusion: The findings of this study have revealed the need to strengthen records management as a critical success factor in risk mitigation within KCB and, by extension, the Kenyan banking industry. A records management model was proposed to guide the management of records within an enterprise-wide risk management framework in the bank.

  1. Teaching Disaster Risk Management: Lessons from the Rotman School of Management

    Directory of Open Access Journals (Sweden)

    ANDRÁS TILCSIK

    Full Text Available This article describes how disaster risk management topics are taught at the Rotman School of Management at the University of Toronto and thus highlights opportunities for developing similar course modules on disaster risk management at other institutions. An undergraduate and MBA elective course, titled Catastrophic Failure in Organizations, contains four modules that are directly relevant to disaster risk management. The first module focuses on the need to move from risk indifference to risk sensitivity. The second module considers the importance of business continuity and crisis management plans and explores their common shortcomings. The third module uses a case study to examine the topic of prospective risk management. The fourth module focuses on the vulnerability of supply chains and other complex systems to disaster risk. The article describes the details of implementing these modules and discusses opportunities for further integration of disaster risk management topics in other parts of the curriculum.

  2. RISK MANAGEMENT AND RISK COMMUNICATION IN MOZAMBIQUE: THE CASE OF ARMS AND AMMUNITION DEPOTS OF MALHAZINE

    Directory of Open Access Journals (Sweden)

    Luca Bussotti

    2017-12-01

    Full Text Available Risk management and risk communication affect everybody’s daily life. Local authorities have the duty to manage public structures, to inform civilians of the risks coming from these structures, to implement prophylaxis procedures. Military storage sites are fully included in this category. This article presents – through a qualitative methodology based on risk analysis – how risk management and communication in weapons and ammunition warehouses is managed in a “partially free” country, using as a case-study, the Malhazine depot in Mozambique, which resulted in more than 100 deaths. In 2007, an extraordinary accident related to the management of obsolete conventional weapons occurred at the Malazhine warehouse. In this circumstance, the Mozambican Government adopted a policy of classifying the information “highly confidential”. This policy aimed at obscuring facts and responsibilities by hiding the causes of such a huge tragedy. This article concludes with the consideration that a high level of confidentiality in treating issues of public interest, such as the one kept in regard to Malhazine, does not help public authorities to effectively manage and prevent similar risks from occurring again, with resulting negative impacts on local populations.

  3. Enterprise risk management in international construction operations

    CERN Document Server

    Zhao, Xianbo; Low, Sui Pheng

    2015-01-01

    This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...

  4. Risk Management and Simulation

    DEFF Research Database (Denmark)

    Skovmand, David

    2014-01-01

    Review of: Risk Management and Simulation / Aparna Gupta. Boca Raton, FL: CRC Press, 2013, xxix + 491 pp., $99.95(H), ISBN: 978-1-4398-3594-4.......Review of: Risk Management and Simulation / Aparna Gupta. Boca Raton, FL: CRC Press, 2013, xxix + 491 pp., $99.95(H), ISBN: 978-1-4398-3594-4....

  5. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  6. Managing Competing Influences: Risk Acceptance in Operation Rolling Thunder

    Science.gov (United States)

    2017-03-12

    perspective beyond the chance of loss because the nation may require units to fight, even when the odds may not be in their favor. James Creelman and...J. Davidson Frame, Managing Risk in Organizations: A Guide for Managers (San Francisco: Jossey-Bass, 2003), 7. 22 James Creelman and Andrew Smart...translated by Peter Paret and Michael Howard. Princeton: Princeton University Press, 1976. Creelman , James, and Andrew Smart. Risk-Based Performance

  7. The Role and the Effects of Risk Management in IT Projects Success

    Directory of Open Access Journals (Sweden)

    Otniel DIDRAGA

    2013-01-01

    Full Text Available The success of IT projects is influenced by risk and risk management according to the existing project management literature. The paper emphasizes the role of risk management and its contribution to projects success in the existing literature. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2012 from the main IT project management journals and publications. The results are that risk management is a very important component of the project management process and it is assumed implicitly to work in favour of project success. We also performed a quantitative analysis of how risk management processes affect the subjective and objective performance of IT projects in Romanian IT companies.

  8. Hybrid Risk Management Methodology: A Case Study

    Directory of Open Access Journals (Sweden)

    Jacky Siu-Lun Ting

    2009-10-01

    Full Text Available Risk management is a decision-making process involving considerations of political, social, economic and engineering factors with relevant risk assessments relating to a potential hazard. In the last decade, a number of risk management tools are introduced and employed to manage and minimize the uncertainty and threats realization to the organizations. However, the focus of these methodologies are different; in which companies need to adopt various risk management principles to visualize a full picture of the organizational risk level. Regarding to this, this paper presents a new approach of risk management that integrates Hierarchical Holographic Modeling (HHM, Enterprise Risk Management (ERM and Business Recovery Planning (BCP for identifying and assessing risks as well as managing the consequences of realized residual risks. To illustrate the procedures of the proposed methodology, a logistic company ABC Limited is chosen to serve as a case study Through applying HHM and ERM to investigate and assess the risk, ABC Limited can be better evaluated the potential risks and then took the responsive actions (e.g. BCP to handle the risks and crisis in near future.

  9. INTERNAL AUDIT AND RISK MANAGEMENT

    OpenAIRE

    Elena RUSE; Georgiana SUSMANSCHI (BADEA); Daniel DĂNECI-PĂTRĂU

    2014-01-01

    The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (un)chance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities int...

  10. Systematic implementation of clinical risk management in a large university hospital: the impact of risk managers.

    Science.gov (United States)

    Sendlhofer, Gerald; Brunner, Gernot; Tax, Christa; Falzberger, Gebhard; Smolle, Josef; Leitgeb, Karina; Kober, Brigitte; Kamolz, Lars Peter

    2015-01-01

    For health care systems in recent years, patient safety has increasingly become a priority issue. National and international strategies have been considered to attempt to overcome the most prominent hazards while patients are receiving health care. Thereby, clinical risk management (CRM) plays a dominant role in enabling the identification, analysis, and management of potential risks. CRM implementation into routine procedures within complex hospital organizations is challenging, as in the past, organizational change strategies using a top-down approach have often failed. Therefore, one of our main objectives was to educate a certain number of risk managers in facilitating CRM using a bottom-up approach. To achieve our primary purpose, five project strands were developed, and consequently followed, introducing CRM: corporate governance, risk management (RM) training, CRM process, information, and involvement. The core part of the CRM process involved the education of risk managers within each organizational unit. To account for the size of the existing organization, we assumed that a minimum of 1 % of the workforce had to be trained in RM to disseminate the continuous improvement of quality and safety. Following a roll-out plan, CRM was introduced in each unit and potential risks were identified. Alongside the changes in the corporate governance, a hospital-wide CRM process was introduced resulting in 158 trained risk managers correlating to 2.0 % of the total workforce. Currently, risk managers are present in every unit and have identified 360 operational risks. Among those, 176 risks were scored as strategic and clustered together into top risks. Effective meeting structures and opportunities to share information and knowledge were introduced. Thus far, 31 units have been externally audited in CRM. The CRM approach is unique with respect to its dimension; members of all health care professions were trained to be able to identify potential risks. A network of risk

  11. RiskREP: Risk-Based Security Requirements Elicitation and Prioritization (extended version)

    NARCIS (Netherlands)

    Herrmann, Andrea; Morali, A.

    2010-01-01

    Today, companies are required to be in control of the security of their IT assets. This is especially challenging in the presence of limited budgets and conflicting requirements. Here, we present Risk-Based Requirements Elicitation and Prioritization (RiskREP), a method for managing IT security

  12. Risk Management in Insurance Companies

    OpenAIRE

    Yang, Xufeng

    2006-01-01

    Insurance is the uncertain business in uncertain society. Today, insures face more complex and difficult risks. Efficient risk management mechanisms are essential for the insurers. The paper is set out initially to explore UK insurance companies risk management and risk disclosure by examining companies annual report after all the listed insurance companies are required to disclose risk information in their annual report, which seeks to reflect the recent development in UK insurance companies...

  13. Financial risk management of pharmacy benefits.

    Science.gov (United States)

    Saikami, D

    1997-10-01

    Financial risk management of pharmacy benefits in integrated health systems is explained. A managed care organization should assume financial risk for pharmacy benefits only if it can manage the risk. Horizontally integrated organizations often do not have much control over the management of drug utilization and costs. Vertically integrated organizations have the greatest ability to manage pharmacy financial risk; virtual integration may also be compatible. Contracts can be established in which the provider is incentivized or placed at partial or full risk. The main concerns that health plans have with respect to pharmacy capitation are formulary management and the question of who should receive rebates from manufacturers. The components needed to managed pharmacy financial risk depend on the type of contract negotiated. Health-system pharmacists are uniquely positioned to take advantage of opportunities opening up through pharmacy risk contracting. Functions most organizations must provide when assuming pharmacy financial risk can be divided into internal and external categories. Internally performed functions include formulary management, clinical pharmacy services and utilization management, and utilization reports for physicians. Functions that can be outsourced include claims processing and administration, provider- and customer support services, and rebates. Organizations that integrate the pharmacy benefit across the health care continuum will be more effective in controlling costs and improving outcomes than organizations that handle this benefit as separate from others. Patient care should not focus on payment mechanisms and unit costs but on developing superior processes and systems that improve health care.

  14. Assessing surface water flood risk and management strategies under future climate change: Insights from an Agent-Based Model.

    Science.gov (United States)

    Jenkins, K; Surminski, S; Hall, J; Crick, F

    2017-10-01

    Climate change and increasing urbanization are projected to result in an increase in surface water flooding and consequential damages in the future. In this paper, we present insights from a novel Agent Based Model (ABM), applied to a London case study of surface water flood risk, designed to assess the interplay between different adaptation options; how risk reduction could be achieved by homeowners and government; and the role of flood insurance and the new flood insurance pool, Flood Re, in the context of climate change. The analysis highlights that while combined investment in property-level flood protection and sustainable urban drainage systems reduce surface water flood risk, the benefits can be outweighed by continued development in high risk areas and the effects of climate change. In our simulations, Flood Re is beneficial in its function to provide affordable insurance, even under climate change. However, the scheme does face increasing financial pressure due to rising surface water flood damages. If the intended transition to risk-based pricing is to take place then a determined and coordinated strategy will be needed to manage flood risk, which utilises insurance incentives, limits new development, and supports resilience measures. Our modelling approach and findings are highly relevant for the ongoing regulatory and political approval process for Flood Re as well as for wider discussions on the potential of insurance schemes to incentivise flood risk management and climate adaptation in the UK and internationally. Copyright © 2017 Elsevier B.V. All rights reserved.

  15. PERFORMANCE IN INTERNAL CONTROL AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    JELER (POPA IOANA

    2017-06-01

    Full Text Available The purpose of this article is to highlight the importance of internal control and risk management. In practice, economic entities meet a variety of risks that have the origins from the internal environment or the external one. Although there are different of views on addressing the concept of risk - threats or opportunities, event or action, accordingly uncertain, proposed by specialists in risk management in this article we try to present these issues and identify techniques to counter risks occurrence. In this article we present also means managing risk and why needs to be implemented at institutional level a risk management. The paper concludes by highlight the role of efficient risk management in the company’s management and company's activities.

  16. Risk management for companies focused on innovation processes

    Directory of Open Access Journals (Sweden)

    Ana Paula Beck da Silva Etges

    Full Text Available Abstract Risk is inherent to the activities of technology and innovation companies and to manage them represent an opportunity to improve the company capability to achieve its goals. The use of ERM models has been studied since the Committee of Sponsoring Organizations of the Treadway Commission guides. This article adapted the MIGGRI model for the context of an innovation company from a TSP in Brazil. Using a case study and a review from previous ERM literature, the article show that is possible to measure the risks that an innovation company faces, and that they may be managed with a view to supporting a company’s strategy. Were applied an economic analysis based on a MCS and an indicator of CFaR were applied to measure innovation risks. A strategic performance model for innovation companies are proposed and the benefit to implement Risk Management practices in innovation organizations was validated.

  17. The Strategic-Renovation Banks’ Risks Management

    Directory of Open Access Journals (Sweden)

    Yeremeychuk Raisa A.

    2017-04-01

    Full Text Available The article is aimed at developing approaches to implementation of the strategic-renovation risk management. Essence of risk theories was researched, the concept of «risk» in the bank’s management system were analyzed. On the basis of a theoretical generalization of scientific literature and the carried out analysis of existing risk management strategies to ensure the security of banking business, the strategy of renovation management has been selected. Because bank risks are part of the economic risk system, they are complex in their nature. However, given the importance of bank risks, the interpretation of their essence is still a debating matter. In a certain number of cases, their essence is replaced by the cause of occurrence, that is, all the different circumstances, factors that lead to the losses. So today, banks are considering risks, in particular, not only as a source of possible losses, but also as an opportunity to generate additional profits. An algorithm for taking a strategic-renovation decision on the banks’ risks management system has been proposed.

  18. Risk, innovation and change : design propositions for implementing risk management in organizations

    NARCIS (Netherlands)

    van Staveren, Martinus Theodorus

    2009-01-01

    This Ph.D. research generated unique design propositions for implementing existing risk management methodologies in organizations. The resulting design propositions incorporate a synthesis of risk management, innovation management and change management. True implementation of risk management is

  19. An enhanced data-analytic framework for integrating risk management and performance management

    International Nuclear Information System (INIS)

    Thekdi, Shital; Aven, Terje

    2016-01-01

    There is increasing interest for agencies and industries to develop risk management processes for a wide variety of applications. Traditional risk management processes are motivated by controlling risk and avoiding losses. In contrast, other organizational processes focus on managing performance and value generation. In this paper we argue that risk management also adds an important contribution to these processes. However, this requires “proper” risk management extending beyond narrow safety oriented perspectives built on quantitative risk analysis and tolerability/acceptance criteria. There is need for a broad risk-performance framework with uncertainty being a main component of risk, and where knowledge and surprises are adequately reflected. In the paper we present and discuss such a framework. The framework is developed on the basis of an analysis of combinations of different risk management and performance management practices/policies. We show how the risk and performance management processes can be improved by proper risk conceptualization and a holistic thinking on how to develop and use goals in the organization, how to balance different concerns, and consider the need for agility – “sensitivity to operations”, as well as how to give weight to vulnerabilities, resilience, and antifragility. - Highlights: • We relate key performance management and risk management principles. • We propose an enhanced framework to unify thinking of performance and risk. • We apply the framework to a public-private partnership case study.

  20. Tank waste remediation system programmatic risk management plan

    International Nuclear Information System (INIS)

    Seaver, D.A.

    1995-01-01

    This risk management plan defines the approach to be taken to managing risks in the Tank Waste Remediation System (TWRS) program. It defines the actions to be taken at the overall program level, and the risk management requirements for lower-level projects and other activities. The primary focus of this plan is on ''programmatic'' risks, i.e., risks with respect to the cost, schedule, and technical performance of the program. The plan defines an approach providing managers with the flexibility to manage risks according to their specific needs, yet creates. The consistency needed for effectiveness across the program. The basic risk management approach uses a risk management list for the program, each project, and additional lower-level activities. The risk management list will be regularly reviewed and updated by appropriate level of management. Each list defines key risks, their likelihood and consequences, risk management actions to be taken, responsible individuals, and other management information

  1. Managing sovereign credit risk in bond portfolios

    OpenAIRE

    Bruder, Benjamin; Hereil, Pierre; Roncalli, Thierry

    2011-01-01

    With the recent development of the European debt crisis, traditional index bond management has been severely called into question. We focus here on the risk issues raised by the classical market-capitalization weighting scheme. We propose an approach to properly measure sovereign credit risk in a fixed-income portfolio. For that, we assume that CDS spreads follow a SABR process and we derive a sovereign credit risk measure based on CDS spreads and duration of portfolio bonds. We then consider...

  2. Perspectives: Intellectual Risk Management

    Science.gov (United States)

    Hall, James C.

    2013-01-01

    Ask a college administrator about students and risk management, and you're likely to get a quick and agitated speech about alcohol consumption and bad behavior or a meditation on mental health and campus safety. But in colleges and universities, we manage intellectual risk-taking too. Bring that up, and you'll probably get little out of that same…

  3. Information systems for risk management

    OpenAIRE

    Michael S. Gibson

    1997-01-01

    Risk management information systems are designed to overcome the problem of aggregating data across diverse trading units. The design of an information system depends on the risk measurement methodology that a firm chooses. Inherent in the design of both a risk management information system and a risk measurement methodology is a tradeoff between the accuracy of the resulting measures of risk and the burden of computing them. Technical progress will make this tradeoff more favorable over time...

  4. How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management

    CERN Document Server

    Ward, Stephen

    2011-01-01

    Since I wrote the Foreword for the second edition of this book, risk management processes have become much more widely used, but controversy about what should be done and how best to do it has grown. Managing risk is a risky business. Chapman and Ward provide an in-depth explanation of why it is important to understand and manage underlying uncertainty in all its forms, in order to realise opportunities more fully and enhance corporate performance. They show what best practice should look like. The implications go well beyond the conventional wisdom of project risk management, providing an enl

  5. Enterprise risk management: A process for enhanced management and improved performance

    OpenAIRE

    Gates , Stephen; Nicolas , Jean-Louis; Walker , Paul L.

    2012-01-01

    Some company boards of directors and management teams are still reluctant to embrace enterprise risk management (ERM) because of the uncertainty regarding its value to the bottom line. A survey of audit and risk management executives suggests that the use of ERM leads to increased management consensus, better-informed decisions, enhanced communication of risk taking, and greater management accountability.

  6. Managing Disease Risks from Trade: Strategic Behavior with Many Choices and Price Effects.

    Science.gov (United States)

    Chitchumnong, Piyayut; Horan, Richard D

    2018-03-16

    An individual's infectious disease risks, and hence the individual's incentives for risk mitigation, may be influenced by others' risk management choices. If so, then there will be strategic interactions among individuals, whereby each makes his or her own risk management decisions based, at least in part, on the expected decisions of others. Prior work has shown that multiple equilibria could arise in this setting, with one equilibrium being a coordination failure in which individuals make too few investments in protection. However, these results are largely based on simplified models involving a single management choice and fixed prices that may influence risk management incentives. Relaxing these assumptions, we find strategic interactions influence, and are influenced by, choices involving multiple management options and market price effects. In particular, we find these features can reduce or eliminate concerns about multiple equilibria and coordination failure. This has important policy implications relative to simpler models.

  7. Risk Management Standards: Towards a contemporary, organisation-wide management approach

    OpenAIRE

    Koutsoukis, Nikitas-Spiros

    2010-01-01

    Risk management has been progressively evolving into a systemic approach for organisational decision making in today’s dynamic economic environment of the global era. In this context, risk management is reaching beyond its traditional finance and insurance application context and is entering the sphere of generic, organisation-wide management approaches. In support of this argument we consider four generic risk management standards issued at the institutional, national or international level...

  8. Assessing and managing multiple risks in a changing world-The Roskilde recommendations.

    Science.gov (United States)

    Selck, Henriette; Adamsen, Peter B; Backhaus, Thomas; Banta, Gary T; Bruce, Peter K H; Burton, G Allen; Butts, Michael B; Boegh, Eva; Clague, John J; Dinh, Khuong V; Doorn, Neelke; Gunnarsson, Jonas S; Hauggaard-Nielsen, Henrik; Hazlerigg, Charles; Hunka, Agnieszka D; Jensen, John; Lin, Yan; Loureiro, Susana; Miraglia, Simona; Munns, Wayne R; Nadim, Farrokh; Palmqvist, Annemette; Rämö, Robert A; Seaby, Lauren P; Syberg, Kristian; Tangaa, Stine R; Thit, Amalie; Windfeld, Ronja; Zalewski, Maciej; Chapman, Peter M

    2017-01-01

    Roskilde University (Denmark) hosted a November 2015 workshop, Environmental Risk-Assessing and Managing Multiple Risks in a Changing World. This Focus article presents the consensus recommendations of 30 attendees from 9 countries regarding implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process; dealing with societal issues; risk-management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. The authors encourage both cross-disciplinary and interdisciplinary approaches to address their 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and nonchemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk-assessment process; 4) fully integrate risk assessors and communities of interest into the risk-management process; 5) consider socioeconomics and increased transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference conditions and the proper ecological context for assessments in human-modified systems; 8) assess risks and benefits to humans and the ecosystem and consider unintended consequences of management actions; 9) avoid excessive conservatism or possible underprotection resulting from sole reliance on binary, numerical benchmarks; and 10) develop adaptive risk-management and regulatory goals based on ranges of uncertainty. Environ Toxicol Chem 2017;36:7-16. © 2016 SETAC. © 2016 SETAC.

  9. The future of monitoring in clinical research - a holistic approach: linking risk-based monitoring with quality management principles.

    Science.gov (United States)

    Ansmann, Eva B; Hecht, Arthur; Henn, Doris K; Leptien, Sabine; Stelzer, Hans Günther

    2013-01-01

    Since several years risk-based monitoring is the new "magic bullet" for improvement in clinical research. Lots of authors in clinical research ranging from industry and academia to authorities are keen on demonstrating better monitoring-efficiency by reducing monitoring visits, monitoring time on site, monitoring costs and so on, always arguing with the use of risk-based monitoring principles. Mostly forgotten is the fact, that the use of risk-based monitoring is only adequate if all mandatory prerequisites at site and for the monitor and the sponsor are fulfilled.Based on the relevant chapter in ICH GCP (International Conference on Harmonisation of technical requirements for registration of pharmaceuticals for human use - Good Clinical Practice) this publication takes a holistic approach by identifying and describing the requirements for future monitoring and the use of risk-based monitoring. As the authors are operational managers as well as QA (Quality Assurance) experts, both aspects are represented to come up with efficient and qualitative ways of future monitoring according to ICH GCP.

  10. Strategies and criteria for risk-based configuration control

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.

    1991-01-01

    A configuration, as used here, is a set of component operability or statuses that define the state of a nuclear power plant. Risk-based configuration control is the management of component configurations using a risk perspective to control risk and assure safety. If the component configurations that have high risk implications do not occur then the risk from the operation of nuclear power plants would be minimal. The control of component configurations, i.e., the management of component statuses, so that the risk from components being unavailable is minimized, becomes difficult because the status of a standby safety system component is often not apparent unless it is tested. In this paper, we discuss the strategies and criteria for risk-based configuration control in nuclear power plants. In developing these strategies and criteria, the primary objective is to obtain more direct risk control but the added benefit is the effective use of plant resources. Implementation of such approaches can result in replacement/modification of parts of Technical Specifications. Specifically, the risk impact or safety impact of a configuration depends upon four factors: (1) The configuration components which are simultaneously down (i.e., inoperable); (2) the backup components which are known to be up (i.e., operable); (3) the duration of time the configuration exists (the outage time); and (4) the frequency at which the configuration occurs. Risk-based configuration control involves managing these factors using risk analyses and risk insights. In this paper, we discuss each of the factors and illustrate how they can be controlled. The information and the tools needed in implementing configuration control are also discussed. The risk-based calculation requirements in achieving the control are also delineated. 4 refs., 4 figs., 1 tab

  11. Development of computerized risk management tool

    International Nuclear Information System (INIS)

    Kil Yoo Kim; Mee Jung Hwang; Seung Cheol Jang; Sang Hoon Han; Tae Woon Kim

    1997-01-01

    The author describes the kinds of efforts for the development of computerized risk management tool; (1) development of a risk monitor, Risk Monster, (2) improvement of McFarm (Missing Cutsets Finding Algorithm for Risk Monitor) and finally (3) development of reliability database management system, KwDBMan. Risk Monster supports for plant operators and maintenance schedulers to monitor plant risk and to avoid high peak risk by rearranging maintenance work schedule. Improved McFarm significantly improved calculation speed of Risk Monster for the cases of supporting system OOS (Out Of Service). KwDBMan manages event data, generic data and CCF (Common Cause Failure) data to support Risk Monster as well as PSA tool, KIRAP (KAERI Integrated Reliability Analysis Package)

  12. Processing Risk In Asset Management : Exploring The Boundaries Of Risk Based Optimization Under Uncertainty For An Energy Infrastructure Asset Manager

    NARCIS (Netherlands)

    Wijnia, Y.C.

    2016-01-01

    In the liberalized energy market Distribution Network Operators (DNOs) are confronted with income reductions by the regulator. The common response to this challenge is the implementation of asset management, which can be regarded as systematically applying Cost Benefit Analysis (CBA) to the risks in

  13. 12 CFR 932.3 - Risk-based capital requirement.

    Science.gov (United States)

    2010-01-01

    ... credit risk capital requirement, its market risk capital requirement, and its operations risk capital... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk-based capital requirement. 932.3 Section 932.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND...

  14. Understanding and managing risk attitude

    National Research Council Canada - National Science Library

    Hillson, David; Murray-Webster, Ruth

    2007-01-01

    ... This book highlights how risk attitude factors influence the human psyche, and carefully explains the impacts. Organisations seeking to dramatically improve the effectiveness of their risk management process will want to use this book's insights. Craig Peterson, President, PMI Risk Management SIG This book has prompted me to think more deeply as a change d...

  15. Managing risks and hazardous in industrial operations

    Energy Technology Data Exchange (ETDEWEB)

    Almaula, S.C. [Woodward-Clyde International, Oakland, CA (United States)

    1996-12-31

    The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 to $200,000. 3 refs., 2 figs., 1 tab.

  16. IT Operational Risk Measurement Model Based on Internal Loss Data of Banks

    Science.gov (United States)

    Hao, Xiaoling

    Business operation of banks relies increasingly on information technology (IT) and the most important role of IT is to guarantee the operational continuity of business process. Therefore, IT Risk management efforts need to be seen from the perspective of operational continuity. Traditional IT risk studies focused on IT asset-based risk analysis and risk-matrix based qualitative risk evaluation. In practice, IT risk management practices of banking industry are still limited to the IT department and aren't integrated into business risk management, which causes the two departments to work in isolation. This paper presents an improved methodology for dealing with IT operational risk. It adopts quantitative measurement method, based on the internal business loss data about IT events, and uses Monte Carlo simulation to predict the potential losses. We establish the correlation between the IT resources and business processes to make sure risk management of IT and business can work synergistically.

  17. Business resilience: Reframing healthcare risk management.

    Science.gov (United States)

    Simeone, Cynthia L

    2015-09-01

    The responsibility of risk management in healthcare is fractured, with multiple stakeholders. Most hospitals and healthcare systems do not have a fully integrated risk management system that spans the entire organizational and operational structure for the delivery of key services. This article provides insight toward utilizing a comprehensive Business Resilience program and associated methodology to understand and manage organizational risk leading to organizational effectiveness and operational efficiencies, with the fringe benefit of realizing sustainable operational capability during adverse conditions. © 2015 American Society for Healthcare Risk Management of the American Hospital Association.

  18. New approach to managing nuclear criticality risk at Nuclear Fuel Services, Inc

    International Nuclear Information System (INIS)

    Green, R.; Droke, R.; Paine, D.

    1992-01-01

    The negative aspects of having a nuclear criticality accident at a fuel fabrication facility have substantially increased in recent years. Although ensuring that the facility is designed and operating in a critically safe manner is a high management priority, practices of managing the risk of a criticality accident have not significantly changed. The method of evaluating risk based on quantitative analysis can enable management to adapt to the increased consequences of a nuclear criticality accident. Additional controls may be placed on high-risk areas within a facility to ensure safe operation of the plant. Areas where controls are in place that impede the productivity of the facility and have negligible impact on criticality safety may be removed or replaced. Management can also streamline the safety analysis efforts applied to facility upgrades by demonstrating that proposed design changes do not compromise criticality safety. Future expansion of quantitative analysis techniques will also allow risk-based management decisions on industrial, radiological, and environmental safety

  19. Risk Management in the Exchange Fund Account

    OpenAIRE

    Michel Rochette

    2002-01-01

    In this article, author Michel Rochette of the Bank's Risk-Management Unit briefly describes the initiatives undertaken to identify, analyze, model, and manage the principal risks inherent in the transactions of the Exchange Fund Account (EFA), where the international reserves of the federal government are held. The author focuses on five types of risk: credit risk, market risk, liquidity risk, operational risk, and legal risk. In addition, the author presents the risk-management principles u...

  20. 12 CFR 932.1 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  1. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J. [Pacific Northwest Lab., Richland, WA (United States); Roybal, A.L. [Western Area Power Administration, Golden, CO (United States)

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  2. RISK MANAGEMENT IN THE ELECTRONIC BUSINESS

    Directory of Open Access Journals (Sweden)

    Georgeta Soava

    2016-12-01

    Full Text Available Risk should not be understood as a destructive phenomenon, but bear in mind that managers who know how to use it can lead to real opportunities. Manager must first recognize the existence of risk, namely to identify and then use specific methods to avoid or reduce the risk. The purpose of this paper is to enter the world, at all simple, of risk management, relatively easy concept to understand but not so easy to put into practice. Of course, the approach relates primarily at the risks inherent of the business in digital environments, but they not represent only a particular case of the risks they are exposed, in general, the companies. In the paper we put in evidence the significance in general business, risks in e-business, then we added a description of the types of security risks, an exemplification of these and a series of test scenarios, and finally to make a analysis of operational solutions of risk management

  3. Preliminary characterization of risks in the nuclear waste management system based on information in the literature

    International Nuclear Information System (INIS)

    Daling, P.M.; Rhoads, R.E.; Van Luick, A.E.; Fecht, B.A.; Nilson, S.A.; Sevigny, N.L.; Armstrong, G.R.; Hill, D.H.; Rowe, M.; Stern, E.

    1992-01-01

    This document presents preliminary information on the radiological and nonradiological risks in the nuclear waste management system. The objective of the study was to (1) review the literature containing information on risks in the nuclear waste management system and (2) use this information to develop preliminary estimates of the potential magnitude of these risks. Information was collected on a broad range of risk categories to assist the US Department of Energy (DOE) in communicating information about the risks in the waste management systems. The study examined all of the portions of the nuclear waste management system currently expected to be developed by the DOE. The scope of this document includes the potential repository, the integral MRS facility, and the transportation system that supports the potential repository and the MRS facility. Relevant literature was reviewed for several potential repository sites and geologic media. A wide range of ''risk categories'' are addressed in this report: (1) public and occupational risks from accidents that could release radiological materials, (2) public and occupational radiation exposure resulting from routine operations, (3) public and occupational risks from accidents involving hazards other than radioactive materials, and (4) public and occupational risks from exposure to nonradioactive hazardous materials during routine operations. The report is intended to provide a broad spectrum of risk-related information about the waste management system. This information is intended to be helpful for planning future studies

  4. Trends in risk management in nuclear industry

    International Nuclear Information System (INIS)

    Kim, Inn Seock

    1996-01-01

    Safety management may be classified into three dimensions: risk management, accident management, and emergency management. This paper addresses the recent trends of safety management in nuclear industry, focussing on risk management and accident management

  5. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  6. Risk-Based Approach for Microbiological Food Safety Management in the Dairy Industry: The Case of Listeria monocytogenes in Soft Cheese Made from Pasteurized Milk.

    Science.gov (United States)

    Tenenhaus-Aziza, Fanny; Daudin, Jean-Jacques; Maffre, Alexandre; Sanaa, Moez

    2014-01-01

    According to Codex Alimentarius Commission recommendations, management options applied at the process production level should be based on good hygiene practices, HACCP system, and new risk management metrics such as the food safety objective. To follow this last recommendation, the use of quantitative microbiological risk assessment is an appealing approach to link new risk-based metrics to management options that may be applied by food operators. Through a specific case study, Listeria monocytogenes in soft cheese made from pasteurized milk, the objective of the present article is to practically show how quantitative risk assessment could be used to direct potential intervention strategies at different food processing steps. Based on many assumptions, the model developed estimates the risk of listeriosis at the moment of consumption taking into account the entire manufacturing process and potential sources of contamination. From pasteurization to consumption, the amplification of a primo-contamination event of the milk, the fresh cheese or the process environment is simulated, over time, space, and between products, accounting for the impact of management options, such as hygienic operations and sampling plans. A sensitivity analysis of the model will help orientating data to be collected prioritarily for the improvement and the validation of the model. What-if scenarios were simulated and allowed for the identification of major parameters contributing to the risk of listeriosis and the optimization of preventive and corrective measures. © 2013 Society for Risk Analysis.

  7. Integrated supply chain risk management

    OpenAIRE

    Riaan Bredell; Jackie Walters

    2007-01-01

    Integrated supply chain risk management (ISCRM) has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly ...

  8. Risks in hospitals. Assessment and Management

    Directory of Open Access Journals (Sweden)

    Bradea Ioana-Alexandra

    2014-12-01

    Full Text Available In a complex world, characterized by a multitude of risks, managers need to manage the risks they encounter, in an efficient way and in the shortest time possible. In the current economic crisis, the concept of hospital risk management, as the process in which is identified, analyzed, reduced, or avoided a risk that may affect the hospital, gained great importance. The Romanian health system, distinguished by: lack of transparency, poor funding, the loss of the valuable medical staff, lack of hospitals in villages and small towns, inability to engage patients due to the old and poor equipment, lack of research and problems in information privacy and cyber-security, requires an appropriate management, enabling risk managers to take decisions in order to avoid the occurrence of risks. Important for the functioning of every hospital is the perception of patients and their degree of satisfaction, regarding the quality of services, which depend largely on the quality of human resources. But what are the human resources weaknesses and risks from the patient point of view? What are the risk indicators which must be monitored to avoid risks? And also, which is the most useful method for measurement and assessment of risk?

  9. [Does clinical risk management require a structured conflict management?].

    Science.gov (United States)

    Neumann, Stefan

    2015-01-01

    A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.

  10. Designing an integrated model based on the indicators Quality and Earned Value for risk management in Information Technology Projects

    OpenAIRE

    TATLARI, Mohammad Reza; KAZEMİPOOR, Hamed

    2015-01-01

    There are two effective factors on Information Technology (IT) projects risk including quality and earned value so that by controlling these two factors and their increased level in IT projects, the corresponding risk can be decreased. Therefore in present study, an integrated model was designed based on quality and earned value indicators for risk management in IT projects on a new and efficient approach. The proposed algorithm included the steps such as preparing a list of several indicator...

  11. The development of a 3-d risk matrix for qualitative maintenance risk management

    International Nuclear Information System (INIS)

    Hsu, Pi-Lin; Lo, Chung-Kung

    2009-01-01

    The 3-D Risk Matrix is a web-based tool, developed by the Institute of Nuclear Energy research (INER), to assist plant personnel for qualitative assessment of operational risks inherent with scheduling of system/component maintenance and testing. This paper focuses on a software development for a three-dimensional risk matrix which serves as a sub-function embedded in the Maintenance Rule (MR) risk management tool used by the Taiwan's nuclear power plants. The color in any field of the matrix directly corresponds to the risk condition level of the related plant maintenance configuration. It also informs the operators via graphical interface of the remaining hours before reaching to the potentially more significant risk level. In the 3-D Risk Matrix, the risk levels can be quickly determined since the conditional Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) for each expected and allowed out-of-service sub-systems or trains combination is pre-calculated by INERISKEN. The 3-D Risk Matrix will play an important role to enhance the MR risk management tool during the on-line maintenances in Taiwan's nuclear power plants

  12. On the perceived usefulness of risk descriptions for decision-making in disaster risk management

    International Nuclear Information System (INIS)

    Lin, Lexin; Nilsson, Anders; Sjölin, Johan; Abrahamsson, Marcus; Tehler, Henrik

    2015-01-01

    Managing risk using an “all-hazards” and “whole of society”-approach involves extensive communication of risk descriptions among many stakeholders. In the present study we investigate how professionals working with disaster risk management in such contexts perceive the usefulness of different descriptions of risk. Empirical data from the Swedish disaster risk management system were used in an attempt to investigate the aspects of a risk description that affect its usefulness (as perceived by professionals). Thirty-three local municipal risk and vulnerability assessments (RVA documents) produced in the region of Scania in 2012 were analyzed in terms of six variables. The documents were then ranked by professionals based on their perceived usefulness for decision-making. Statistical analysis was conducted to identify any possible correlations between the overall ranking of the usefulness of the municipal RVA:s and each of the variables. We conclude that the way the likelihood and consequences of scenarios are described influence the perceived usefulness of a risk description. Furthermore, whether descriptions of scenarios are included in a risk description or not, and whether background information concerning the likelihood of scenarios are included also influence perceived usefulness of risk descriptions. - Highlights: • Written communication of risk between professionals is investigated. • The way likelihood is described influences a risk description's usefulness. • The way consequences are described influence a risk description's usefulness. • Whether background information is included in a risk description influences its usefulness

  13. Quality Risk Management: Putting GMP Controls First.

    Science.gov (United States)

    O'Donnell, Kevin; Greene, Anne; Zwitkovits, Michael; Calnan, Nuala

    2012-01-01

    This paper presents a practical way in which current approaches to quality risk management (QRM) may be improved, such that they better support qualification, validation programs, and change control proposals at manufacturing sites. The paper is focused on the treatment of good manufacturing practice (GMP) controls during QRM exercises. It specifically addresses why it is important to evaluate and classify such controls in terms of how they affect the severity, probability of occurrence, and detection ratings that may be assigned to potential failure modes or negative events. It also presents a QRM process that is designed to directly link the outputs of risk assessments and risk control activities with qualification and validation protocols in the GMP environment. This paper concerns the need for improvement in the use of risk-based principles and tools when working to ensure that the manufacturing processes used to produce medicines, and their related equipment, are appropriate. Manufacturing processes need to be validated (or proven) to demonstrate that they can produce a medicine of the required quality. The items of equipment used in such processes need to be qualified, in order to prove that they are fit for their intended use. Quality risk management (QRM) tools can be used to support such qualification and validation activities, but their use should be science-based and subject to as little subjectivity and uncertainty as possible. When changes are proposed to manufacturing processes, equipment, or related activities, they also need careful evaluation to ensure that any risks present are managed effectively. This paper presents a practical approach to how QRM may be improved so that it better supports qualification, validation programs, and change control proposals in a more scientific way. This improved approach is based on the treatment of what are called good manufacturing process (GMP) controls during those QRM exercises. A GMP control can be considered

  14. Risk management as a social defence against anxiety

    Directory of Open Access Journals (Sweden)

    Dirk J. Geldenhuys

    2012-03-01

    Research purpose: The aim of the study is to describe how risk management unconsciously influences behaviour when doing business in an African country. Motivation for the study: Operational risk management is a rational management imperative. However, this does not take cognisance of the unconscious role of risk management. A systems-psychodynamic perspective might be particularly relevant if the anxiety implied in risk management is not appropriately contained. Awareness of these dynamics may provide an opportunity for addressing them and allow for a more holistic way of managing risk. Research design, approach and method: The researchers conducted the study as a qualitative case study in an African country. They used purposive sampling and analysed the data using qualitative content analysis. Main findings: Viewing risk management from a systems-psychodynamic perspective allowed the researchers to identify the influence of risk management on the behaviour of people. The emerging hypothesis was that, if businesses do not address the anxiety underlying risk management, managing risk becomes a social defence against the anxiety. Practical/managerial implications: Awareness of the anxiety involved in risk management may assist businesses to manage risk in a more realistic way, making provision for, and even capitalising on, the human element. Contributions/value-add: The article provides a systems-psychodynamic, and hence a more complete, perspective of operational risk management when doing business in an African country.

  15. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2001-01-01

    The Nevada Risk Assessment/Management Program is part of a national effort by the U.S. Department of Energy (Grant DE-FG01-96EW56093) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the Nevada Risk Assessment/Management Program and presents a synopsis of the effort that began in 1995 and will officially conclude on April 30, 2000. (author)

  16. Imagining flood futures: risk assessment and management in practice.

    Science.gov (United States)

    Lane, Stuart N; Landström, Catharina; Whatmore, Sarah J

    2011-05-13

    The mantra that policy and management should be 'evidence-based' is well established. Less so are the implications that follow from 'evidence' being predictions of the future (forecasts, scenarios, horizons) even though such futures define the actions taken today to make the future sustainable. Here, we consider the tension between 'evidence', reliable because it is observed, and predictions of the future, unobservable in conventional terms. For flood risk management in England and Wales, we show that futures are actively constituted, and so imagined, through 'suites of practices' entwining policy, management and scientific analysis. Management has to constrain analysis because of the many ways in which flood futures can be constructed, but also because of commitment to an accounting calculus, which requires risk to be expressed in monetary terms. It is grounded in numerical simulation, undertaken by scientific consultants who follow policy/management guidelines that define the futures to be considered. Historical evidence is needed to deal with process and parameter uncertainties and the futures imagined are tied to pasts experienced. Reliance on past events is a challenge for prediction, given changing probability (e.g. climate change) and consequence (e.g. development on floodplains). So, risk management allows some elements of risk analysis to become unstable (notably in relation to climate change) but forces others to remain stable (e.g. invoking regulation to prevent inappropriate floodplain development). We conclude that the assumed separation of risk assessment and management is false because the risk calculation has to be defined by management. Making this process accountable requires openness about the procedures that make flood risk analysis more (or less) reliable to those we entrust to produce and act upon them such that, unlike the 'pseudosciences', they can be put to the test of public interrogation by those who have to live with their consequences

  17. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  18. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  19. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  20. An Evidence-Based Review Literature About Risk Indicators and Management of Unknown-Origin Xerostomia

    Directory of Open Access Journals (Sweden)

    Farzaneh Agha-hosseini

    2013-01-01

    Full Text Available Objective: This evidence-based article reviews risk indicators and management of unknown-origin xerostomia. Xerostomia and hyposalivation refer to different aspects of dry mouth. Xerostomia is a subjective sensation of dry mouth, whilst hyposalivation is defined as an objective assessment of reduced salivary flow rate. About 30% of the elderly (65 years and older experience xerostomia and hyposalivation. Structural and functional factors, or both may lead to salivary gland dysfunction.Study Selection: The EBM literature search was conducted by using the medical literature database MEDLINE via PubMed and OvidMedline search engines. Results were limited to English language articles (1965 to present including clinical trials (CT, randomized controlled trials (RCT, systematic reviews and review articles. Case control or cohort studies were included for the etiology.Results: Neuropathic etiology such as localized oral alteration of thermal sensations, saliva composition change (for example higher levels of K, Cl, Ca, IgA, amylase, calcium, PTH and cortisol, lower levels of estrogen and progesterone, smaller salivary gland size, and illnesses such as lichen planus, are risk indicators for unknown-origin xerostomia. The management is palliative and preventative. Management of symptoms includes drug administration (systemic secretogogues, saliva substitutes and bile secretion-stimulator, night guard, diet and habit modifications. Other managements may be indicated to treat adverse effects.Conclusion: Neuropathic etiology, saliva composition change, smaller salivary gland size, and illnesses such as oral lichen planus can be suggestive causes for unknown-origin xerostomia. However, longitudinal studies will be important to elucidate the causes of unknown-origin xerostomia.

  1. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  2. Corporate risk management : an overview

    NARCIS (Netherlands)

    Oosterhof, Casper M.

    2001-01-01

    Corporate risk management and hedging are important activities within financial as well as non-financial corporations. Under the assumptions of Modigliani and Miller [1958], corporate risk management is a redundant activity. However, the existence of market imperfections can explain the corporate

  3. Application of a web-based Decision Support System in risk management

    Science.gov (United States)

    Aye, Zar Chi; Jaboyedoff, Michel; Derron, Marc-Henri

    2013-04-01

    Increasingly, risk information is widely available with the help of advanced technologies such as earth observation satellites, global positioning technologies, coupled with hazard modeling and analysis, and geographical information systems (GIS). Even though it exists, no effort will be put into action if it is not properly presented to the decision makers. These information need to be communicated clearly and show its usefulness so that people can make better informed decision. Therefore, communicating available risk information has become an important challenge and decision support systems have been one of the significant approaches which can help not only in presenting risk information to the decision makers but also in making efficient decisions while reducing human resources and time needed. In this study, the conceptual framework of an internet-based decision support system is presented to highlight its importance role in risk management framework and how it can be applied in case study areas chosen. The main purpose of the proposed system is to facilitate the available risk information in risk reduction by taking into account of the changes in climate, land use and socio-economic along with the risk scenarios. It allows the users to formulate, compare and select risk reduction scenarios (mainly for floods and landslides) through an enhanced participatory platform with diverse stakeholders' involvement in the decision making process. It is based on the three-tier (client-server) architecture which integrates web-GIS plus DSS functionalities together with cost benefit analysis and other supporting tools. Embedding web-GIS provides its end users to make better planning and informed decisions referenced to a geographical location, which is the one of the essential factors in disaster risk reduction programs. Different risk reduction measures of a specific area (local scale) will be evaluated using this web-GIS tool, available risk scenarios obtained from

  4. Overview of Risk Management for Engineered Nanomaterials

    Science.gov (United States)

    Schulte, P. A.; Geraci, C. L.; Hodson, L. L.; Zumwalde, R. D.; Kuempel, E. D.; Murashov, V.; Martinez, K. F.; Heidel, D. S.

    2013-04-01

    Occupational exposure to engineered nanomaterials (ENMs) is considered a new and challenging occurrence. Preliminary information from laboratory studies indicates that workers exposed to some kinds of ENMs could be at risk of adverse health effects. To protect the nanomaterial workforce, a precautionary risk management approach is warranted and given the newness of ENMs and emergence of nanotechnology, a naturalistic view of risk management is useful. Employers have the primary responsibility for providing a safe and healthy workplace. This is achieved by identifying and managing risks which include recognition of hazards, assessing exposures, characterizing actual risk, and implementing measures to control those risks. Following traditional risk management models for nanomaterials is challenging because of uncertainties about the nature of hazards, issues in exposure assessment, questions about appropriate control methods, and lack of occupational exposure limits (OELs) or nano-specific regulations. In the absence of OELs specific for nanomaterials, a precautionary approach has been recommended in many countries. The precautionary approach entails minimizing exposures by using engineering controls and personal protective equipment (PPE). Generally, risk management utilizes the hierarchy of controls. Ideally, risk management for nanomaterials should be part of an enterprise-wide risk management program or system and this should include both risk control and a medical surveillance program that assesses the frequency of adverse effects among groups of workers exposed to nanomaterials. In some cases, the medical surveillance could include medical screening of individual workers to detect early signs of work-related illnesses. All medical surveillance should be used to assess the effectiveness of risk management; however, medical surveillance should be considered as a second line of defense to ensure that implemented risk management practices are effective.

  5. Overview of Risk Management for Engineered Nanomaterials

    International Nuclear Information System (INIS)

    Schulte, P A; Geraci, C L; Hodson, L L; Zumwalde, R D; Kuempel, E D; Murashov, V; Martinez, K F; Heidel, D S

    2013-01-01

    Occupational exposure to engineered nanomaterials (ENMs) is considered a new and challenging occurrence. Preliminary information from laboratory studies indicates that workers exposed to some kinds of ENMs could be at risk of adverse health effects. To protect the nanomaterial workforce, a precautionary risk management approach is warranted and given the newness of ENMs and emergence of nanotechnology, a naturalistic view of risk management is useful. Employers have the primary responsibility for providing a safe and healthy workplace. This is achieved by identifying and managing risks which include recognition of hazards, assessing exposures, characterizing actual risk, and implementing measures to control those risks. Following traditional risk management models for nanomaterials is challenging because of uncertainties about the nature of hazards, issues in exposure assessment, questions about appropriate control methods, and lack of occupational exposure limits (OELs) or nano-specific regulations. In the absence of OELs specific for nanomaterials, a precautionary approach has been recommended in many countries. The precautionary approach entails minimizing exposures by using engineering controls and personal protective equipment (PPE). Generally, risk management utilizes the hierarchy of controls. Ideally, risk management for nanomaterials should be part of an enterprise-wide risk management program or system and this should include both risk control and a medical surveillance program that assesses the frequency of adverse effects among groups of workers exposed to nanomaterials. In some cases, the medical surveillance could include medical screening of individual workers to detect early signs of work-related illnesses. All medical surveillance should be used to assess the effectiveness of risk management; however, medical surveillance should be considered as a second line of defense to ensure that implemented risk management practices are effective.

  6. Risk management on nuclear power plant. Application of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Kojima, Shigeo

    2003-01-01

    In U.S.A., nuclear safety regulation is moving to risk-informed regulation (RIR), so necessity of a standard to provide contents of probabilistic risk assessment (PRA) constructing its roots has been discussed for a long time. In 1998, the Committee on Nuclear Risk Management (CNRM) of the American Society of Mechanical Engineers (ASME) began to investigate the standard, of which last edition was published as the Standard for Probabilistic Risk Management for Nuclear Power Plant Applications: RA-S-2002 (PRMA) on April, 2002. As in the Committee, the Nuclear Regulatory Commission (NRC), electric power companies, national institutes, PRA specialists, and so on took parts to carry out many discussions with full energies of participants on risk management in U.S.A., the standard was finished after about four years' efforts. In U.S.A., risk management having already used PRA is successfully practiced, U.S.A. is at a stage with more advancing steps of the risk management than Japan is. Here was described on the standard of PRA and a concrete method of the risk management carried out at nuclear power stations. (G.K.)

  7. Risk management in facility transition and management decision making: Needs and opportunities

    International Nuclear Information System (INIS)

    Stillwell, W.; Seaver, D.; Keller, J.; Smith, D.; Weaver, D.; Sanders, T.; Thullen, P.

    1993-02-01

    An overall approach to risk management is described in this paper. Many of these concepts have been developed and applied as part of Hanford Mission Planning (HMP) (Hanford Mission Plan, 1992). At Hanford, HMP provides a mechanism for integrating planning across all the missions and programs of the site. This paper discusses the decision context within which EM must make and defend decisions, the types of decisions that are being and will need to be made in order to progress with the cleanup of the DOE complex, and the resulting need for risk management. Risk management, in turn, requires quality health and ecological risk information to make these decisions. Other types of information are also needed, but the risk information is typically the most important and the most difficult to obtain. The paper then describes a general technical approach to risk management, including particular methods for developing the high quality of human health and ecological risk information that will be needed to support risk management. We next turn to several special issues that make risk management more complex than many other decisions. We discuss these issues and offer some practical suggestions with respect to addressing them in the risk management framework. Finally, we conclude with some discussion of other opportunities for applying risk management

  8. Managing Risks in Dry Port Operations

    OpenAIRE

    Ciortescu Cezar-Gabriel; Pãvãla?cu Narcis Sebastian

    2012-01-01

    The purpose of this paper is to have an in-depth look into the phenomenon of risk assessment and risk management strategies in managing dry port operations as an integrated part into international containerized freight trade. The fact that world crises take the form of disruptions, bankruptcies, breakdowns, macroeconomic and political changes, and disasters leads to higher risks and makes risk management more and more difficult. This paper aims to discuss the theory behind the dry port concep...

  9. III: Use of biomarkers as Risk Indicators in Environmental Risk Assessment of oil based discharges offshore.

    Science.gov (United States)

    Sanni, Steinar; Lyng, Emily; Pampanin, Daniela M

    2017-06-01

    Offshore oil and gas activities are required not to cause adverse environmental effects, and risk based management has been established to meet environmental standards. In some risk assessment schemes, Risk Indicators (RIs) are parameters to monitor the development of risk affecting factors. RIs have not yet been established in the Environmental Risk Assessment procedures for management of oil based discharges offshore. This paper evaluates the usefulness of biomarkers as RIs, based on their properties, existing laboratory biomarker data and assessment methods. Data shows several correlations between oil concentrations and biomarker responses, and assessment principles exist that qualify biomarkers for integration into risk procedures. Different ways that these existing biomarkers and methods can be applied as RIs in a probabilistic risk assessment system when linked with whole organism responses are discussed. This can be a useful approach to integrate biomarkers into probabilistic risk assessment related to oil based discharges, representing a potential supplement to information that biomarkers already provide about environmental impact and risk related to these kind of discharges. Copyright © 2016 Elsevier Ltd. All rights reserved.

  10. Packaging and transportation risk management and evaluation plan

    International Nuclear Information System (INIS)

    Rhyne, W.R.

    1993-09-01

    Shipments of radioactive materials and hazardous chemicals at the Los Alamos National Laboratory (LANL) are governed by a variety of Federal and state regulations, industrial standards, and LANL processes and procedures. Good judgement is exercised in situations that are not covered by regulations. As a result, the safety record for transporting hazardous materials at LANL has been excellent. However, future decisions should be made such that the decision-making process produces a defensible record of the safety of onsite shipments. This report proposes the development of a risk management tool to meet this need. First, the application of quantitative risk analysis methodology to transportation is presented to provide a framework of understanding. Risk analysis definitions, the basic quantitative risk analysis procedure, quantitative methodologies, transportation data bases, and risk presentation techniques are described. Quantitative risk analysis is frequently complex; but simplified approaches can be used as a management tool to make good decisions. Second, a plan to apply the use of risk management principles to the selection of routes, special administrative controls, and containers for hazardous material transportation at LANL is provided. A risk management tool is proposed that can be used by MAT-2 without substantial support from specialized safety and risk analysis personnel, e.g., HS-3. A workbook approach is proposed that can be automated at a later date. The safety of some types of onsite shipments at LANL is not well documented. Documenting that shipments are safe, i.e., present acceptable risks, will likely require elaborate analyses that should be thoroughly reviewed by safety and risk professionals. These detailed analyses are used as benchmarks and as examples for the use of the proposed tool by MAT-2. Once the benchmarks are established, the workbook can be used by MAT-2 to quantify that safety goals are met by similar shipments

  11. Management of radiation risk

    International Nuclear Information System (INIS)

    Hubert, P.

    1996-01-01

    The need to control the risk from ionizing radiation can be tracked back to the eve of the twentieth century. However, as knowledge improved and practices expanded, the approaches to this control have evolved. No longer is the mere respect of some forms of exposure limits or safety related standards sufficient. Rather, it is widely admitted that there is a need for managing radiation risk, both by balancing the advantages and disadvantages of enhancing protection and by setting up a proper organization that allows handling of the risk. This paper describes the multiple aspects of radiation risk management and points out the main related issues. It critically analyzes ALARA and ICRP recommendations. 74 refs, 8 figs, 5 tabs

  12. Assessment of Home-Based Nigerian Engineers on Risk ...

    African Journals Online (AJOL)

    Assessment of Home-Based Nigerian Engineers on Risk Management Approach ... Journal of Applied Sciences and Environmental Management ... The Analysis of Variance (ANOVA) and Correlation methods were adopted for statistical ...

  13. Managing risks

    International Nuclear Information System (INIS)

    Nathwani, J.S.

    1993-01-01

    The three principles to guide regulating authorities are: Risks shall be managed to maximize the total expected net benefit to society; The safety benefit to be promoted is quality-adjusted life expectancy; Decisions for the public in regard to health and safety must be open and apply across the entire range of hazards to life and health. Based on the principle that excessive spending on health and safety, or lack of necessary development, may cause poverty and thereby actually decrease (adjusted) life expectancy, the author has developed a Life Product Index which gives comparable results to the Human Development Index promoted by the United Nations Development Program. These two social indicators can be used for purposes such as project evaluation, choosing between alternative technologies, or evaluation of health and safety programs

  14. Are Management-Based Regulations Effective? Evidence from State Pollution Prevention Programs

    Science.gov (United States)

    Bennear, Lori Snyder

    2007-01-01

    This paper evaluates a recent innovation in regulating risk called management-based regulation. Traditionally, risk regulation has either specified a particular means of achieving a risk-reduction goal or specified the goal and left the means of achieving that goal up to the regulated entity. In contrast, management-based regulation neither…

  15. Risk management plan for the National Ignition Facility

    International Nuclear Information System (INIS)

    Brereton, S.; Lane, M.; Smith, C.; Yatabe, J.

    1998-01-01

    The National Ignition Facility (NIF) is a U.S. Department of Energy inertial confinement laser fusion facility, currently under construction at the Lawrence Livermore National Laboratory (LLNL). NIF is a critical tool for the Department of Energy (DOE) science- based Stockpile Stewardship and Management Program. In addition, it represents a major step towards realizing inertial confinement fusion as a source of energy. The NIF will focus 192 laser beams onto spherical targets containing a mixture of deuterium and tritium, causing them to implode. This will create the high temperatures and pressures necessary for these targets to undergo fusion. The plan is for NIF to achieve ignition (i.e., self-heating of the fuel) and energy gain (i.e., more fusion energy produced than laser energy deposited) in the laboratory for the first time. A Risk Management Plan was prepared for the NIF design and construction Project. The plan was prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide. The objectives of the plan were to: (1) identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule, (2) assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES ampersand H (environment, safety and health), costs, and schedule, and (3) address each risk in terms of suitable risk management measures. Major risk elements were identified for the NIF Project. A risk assessment methodology was developed, which was utilized to rank the Project risks with respect to one another. Those elements presenting greater risk were readily identified by this process. This paper describes that methodology and the results

  16. Software And Systems Engineering Risk Management

    Science.gov (United States)

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  17. The Professionalization of Risk Management: What Role can the ISO 31000 Risk Management Principles Play?

    DEFF Research Database (Denmark)

    Olechowski, Alison; Oehmen, Josef; Seering, W.

    2016-01-01

    an empirical investigation and discussion of the eleven principles of the ISO 31000:2009 Risk Management Standard via a large-scale survey of engineering and product development practitioners. Adhering to the risk management principles at a high level was found to be a significant factor in better reaching......Risk management is increasingly seen as a means of improving the likelihood of success in complex engineering projects. Yet the presence of a legitimacy gap, driven by the lack of empirical validation of published best practices, might explain low adoption of risk management on projects. We present...... cost, schedule, technical and customer targets, in addition to achieving a more stable project execution. This finding suggests that, rather than a single rigid standard or an ever-changing set of detailed methods, the ISO principles have potential to be the basis for our shared understanding of best...

  18. A quality risk management model approach for cell therapy manufacturing.

    Science.gov (United States)

    Lopez, Fabio; Di Bartolo, Chiara; Piazza, Tommaso; Passannanti, Antonino; Gerlach, Jörg C; Gridelli, Bruno; Triolo, Fabio

    2010-12-01

    International regulatory authorities view risk management as an essential production need for the development of innovative, somatic cell-based therapies in regenerative medicine. The available risk management guidelines, however, provide little guidance on specific risk analysis approaches and procedures applicable in clinical cell therapy manufacturing. This raises a number of problems. Cell manufacturing is a poorly automated process, prone to operator-introduced variations, and affected by heterogeneity of the processed organs/tissues and lot-dependent variability of reagent (e.g., collagenase) efficiency. In this study, the principal challenges faced in a cell-based product manufacturing context (i.e., high dependence on human intervention and absence of reference standards for acceptable risk levels) are identified and addressed, and a risk management model approach applicable to manufacturing of cells for clinical use is described for the first time. The use of the heuristic and pseudo-quantitative failure mode and effect analysis/failure mode and critical effect analysis risk analysis technique associated with direct estimation of severity, occurrence, and detection is, in this specific context, as effective as, but more efficient than, the analytic hierarchy process. Moreover, a severity/occurrence matrix and Pareto analysis can be successfully adopted to identify priority failure modes on which to act to mitigate risks. The application of this approach to clinical cell therapy manufacturing in regenerative medicine is also discussed. © 2010 Society for Risk Analysis.

  19. Identifying and Managing Risk.

    Science.gov (United States)

    Abraham, Janice M.

    1999-01-01

    The role of the college or university chief financial officer in institutional risk management is (1) to identify risk (physical, casualty, fiscal, business, reputational, workplace safety, legal liability, employment practices, general liability), (2) to develop a campus plan to reduce and control risk, (3) to transfer risk, and (4) to track and…

  20. Network theory-based analysis of risk interactions in large engineering projects

    International Nuclear Information System (INIS)

    Fang, Chao; Marle, Franck; Zio, Enrico; Bocquet, Jean-Claude

    2012-01-01

    This paper presents an approach based on network theory to deal with risk interactions in large engineering projects. Indeed, such projects are exposed to numerous and interdependent risks of various nature, which makes their management more difficult. In this paper, a topological analysis based on network theory is presented, which aims at identifying key elements in the structure of interrelated risks potentially affecting a large engineering project. This analysis serves as a powerful complement to classical project risk analysis. Its originality lies in the application of some network theory indicators to the project risk management field. The construction of the risk network requires the involvement of the project manager and other team members assigned to the risk management process. Its interpretation improves their understanding of risks and their potential interactions. The outcomes of the analysis provide a support for decision-making regarding project risk management. An example of application to a real large engineering project is presented. The conclusion is that some new insights can be found about risks, about their interactions and about the global potential behavior of the project. - Highlights: ► The method addresses the modeling of complexity in project risk analysis. ► Network theory indicators enable other risks than classical criticality analysis to be highlighted. ► This topological analysis improves project manager's understanding of risks and risk interactions. ► This helps project manager to make decisions considering the position in the risk network. ► An application to a real tramway implementation project in a city is provided.

  1. RISKS MANAGEMENT: NEW LITERATURE REVIEW

    OpenAIRE

    Ennouri Wissem

    2013-01-01

    The complexity of the industrial activities and the important mass of flows crossing the supply chain promotes the emergence of risks that must be considered in the decision process. For this reason, we have developed this paper to clarify the basics of risk management through a short new suggestion of literature review for risk management. Our justification of this attempt is that this area is the most discussed in our days and it is impossible to present all definition of the risk concept, ...

  2. A Risk Management Approach for a Sustainable Cloud Migration

    Directory of Open Access Journals (Sweden)

    Alifah Aida Lope Abdul Rahman

    2017-11-01

    Full Text Available Cloud computing is not just about resource sharing, cost savings and optimisation of business performance; it also involves fundamental concerns on how businesses need to respond on the risks and challenges upon migration. Managing risks is critical for a sustainable cloud adoption. It includes several dimensions such as cost, practising the concept of green IT, data quality, continuity of services to users and clients, guarantee tangible benefits. This paper presents a risk management approach for a sustainable cloud migration. We consider four dimensions of sustainability, i.e., economic, environmental, social and technology to determine the viability of cloud for the business context. The risks are systematically identified and analysed based on the existing in house controls and the cloud service provider offerings. We use Dempster Shafer (D-S theory to measure the adequacy of controls and apply semi-quantitative approach to perform risk analysis based on the theory of belief. The risk exposure for each sustainability dimension allows us to determine the viability of cloud migration. A practical migration use case is considered to determine the applicability of our work. The results identify the risk exposure and recommended control for the risk mitigation. We conclude that risks depend on specific migration case and both Cloud Service Provider (CSP and users are responsible for the risk mitigation. Inherent risks can evolve due to the cloud migration.

  3. Operational Risk Assessment and Management in Small and Medium-sized Enterprises

    Directory of Open Access Journals (Sweden)

    Viktorija Stasytytė

    2015-07-01

    Full Text Available Modern organizations have raised a need to actively and quickly react to the changes in external business environment, as well as in internal processes considering not only the present situation, but also evaluating possible changes and forecasting the future. Enterprise risk assessment and management, which is strongly related with foreseeing the uncertain future, becomes topical not only scientifically, but also practically seeking to reveal new and unique solutions. Operational risk management in small and medium enterprises, creating the largest part of value added in the whole European Union, demands a separate attention and coordinated decisions and means. The objective of the paper – to analyse the process of enterprise risk management in small and medium-sized enterprises, as well as to propose adequate risk management solutions for these companies. After performing a research, it was found out that small and medium enterprises more than big organizations require a risk management strategy and methodology, need to distinguish activity objectives and events influencing them, and they can efficiently apply a risk portfolio method to manage risk. In small and medium enterprises it is recommended to incorporate a risk management system based on COSO ERM model that can be modified depending on company needs and possibilities, turning it into less formal and structured and easily applicable.

  4. Value at Risk models for Energy Risk Management

    OpenAIRE

    Novák, Martin

    2010-01-01

    The main focus of this thesis lies on description of Risk Management in context of Energy Trading. The paper will predominantly discuss Value at Risk and its modifications as a main overall indicator of Energy Risk.

  5. Multi-hazard risk analysis for management strategies

    Science.gov (United States)

    Kappes, M.; Keiler, M.; Bell, R.; Glade, T.

    2009-04-01

    Risk management is very often operating in a reactive way, responding to an event, instead of proactive starting with risk analysis and building up the whole process of risk evaluation, prevention, event management and regeneration. Since damage and losses from natural hazards raise continuously more and more studies, concepts (e.g. Switzerland or South Tyrol-Bolozano) and software packages (e.g. ARMAGEDOM, HAZUS or RiskScape) are developed to guide, standardize and facilitate the risk analysis. But these approaches focus on different aspects and are mostly closely adapted to the situation (legislation, organization of the administration, specific processes etc.) of the specific country or region. We propose in this study the development of a flexible methodology for multi-hazard risk analysis, identifying the stakeholders and their needs, processes and their characteristics, modeling approaches as well as incoherencies occurring by combining all these different aspects. Based on this concept a flexible software package will be established consisting of ArcGIS as central base and being complemented by various modules for hazard modeling, vulnerability assessment and risk calculation. Not all modules will be developed newly but taken from the current state-of-the-art and connected or integrated into ArcGIS. For this purpose two study sites, Valtellina in Italy and Bacelonnette in France, were chosen and the hazards types debris flows, rockfalls, landslides, avalanches and floods are planned to be included in the tool for a regional multi-hazard risk analysis. Since the central idea of this tool is its flexibility this will only be a first step, in the future further processes and scales can be included and the instrument thus adapted to any study site.

  6. Risk management guidelines for petroleum storage tank sites

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-10-01

    These guidelines provide a site management process designed particularly for soil and groundwater pollution originating from existing or former petroleum storage tank (PST) facilities and provide uniform standards for the remediation of polluted PST sites in Alberta. The numerical criteria, risk management objectives and technical information described in this document were compiled from four documents including Remediation Guidelines for Petroleum Storage Tank Sites 1994, the Canada-Wide Standards for Petroleum Hydrocarbons in Soil, Alberta Soil and Water Quality Guidelines for Hydrocarbons at Upstream Oil and Gas Facilities, and Guidelines for Managing Risks at Contaminated Sites in Alberta. The changes in these updated guidelines reflect new remediation criteria and provide a process for determining alternate site-specific management objectives for more petroleum storage tank sites. The guidelines were developed using a risk-based approach that ensures the protection of human health, safety and the environment. The guidelines apply to aboveground and underground storage tank facilities that contain gasoline, diesel, heating oil, and aviation fuel. The guidelines specify requirements by Alberta Environment and the Alberta Fire Code. The chapter on risk management process included information on site investigation, determination of soil type, pollution source removal, land use assessment, selection of exposure pathways, depth of remediation, human inhalation and groundwater protection pathways, and verification of remediation. figs, 4 tabs., 2 appendices.

  7. The Relationship between Ownership Structure and Risk Management: Evidence from Iran

    OpenAIRE

    Sheyda Lotfi; Ataollah Mohammadi

    2014-01-01

    This research aims to study the relationship between the Ownership Structure and Risk Management in time period between 2007 to 2013 based on a sample including 642 Year_Firm among campanies listed in Tehran Stock Exchange. In following for each of the variables related to the Ownership Structure such as Institutional Ownership, Management ownership, Family Ownership, and Ownership Concentration, a hypothesis is formulated and its impact upon the Risk Management is investigated. The simple li...

  8. Risk Management for the International Space Station

    Science.gov (United States)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  9. Risk management method for small photovoltaic plants

    Directory of Open Access Journals (Sweden)

    Kirova Milena

    2016-09-01

    Full Text Available Risk management is necessary for achieving the goals of the organization. There are many methods, approaches, and instruments in the literature concerning risk management. However, these are often highly specialized and transferring them to a different field can prove difficult. Therefore, managers often face situations where they have no tools to use for risk management. This is the case with small photovoltaic plants (according to a definition by the Bulgarian State Energy and Water Regulatory Commission small applies to systems with a total installed power of 200 kWp. There are some good practices in the energy field for minimizing risks, but they offer only partial risk prevention and are not sufficient. Therefore a new risk management method needs to be introduced. Small photovoltaic plants offer plenty of advantages in comparison to the other renewable energy sources which makes risk management in their case more important. There is no classification of risks for the exploitation of small photovoltaic systems in the available literature as well as to what degree the damages from those risks could spread. This makes risk analysis and evaluation necessary for obtaining information which could aid taking decisions for improving risk management. The owner of the invested capital takes a decision regarding the degree of acceptable risk for his organization and it must be protected depending on the goals set. Investors in small photovoltaic systems need to decide to what degree the existing risks can influence the goals previously set, the payback of the investment, and what is the acceptable level of damages for the investor. The purpose of this work is to present a risk management method, which currently does not exist in the Bulgaria, so that the risks and the damages that could occur during the exploitation of small photovoltaic plants could be identified and the investment in such technology – justified.

  10. 12 CFR 704.6 - Credit risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Credit risk management. 704.6 Section 704.6... CREDIT UNIONS § 704.6 Credit risk management. (a) Policies. A corporate credit union must operate according to a credit risk management policy that is commensurate with the investment risks and activities...

  11. 76 FR 45724 - Clearing Member Risk Management

    Science.gov (United States)

    2011-08-01

    ... proposed rules address risk management for cleared trades by futures commission merchants, swap dealers... Commission has proposed extensive regulations addressing open access and risk management at the derivatives..., 2011) (Risk Management Requirements for Derivatives Clearing Organizations). These proposed regulations...

  12. Probabilistic risk assessment methodology for risk management and regulatory applications

    International Nuclear Information System (INIS)

    See Meng Wong; Kelly, D.L.; Riley, J.E.

    1997-01-01

    This paper discusses the development and potential applications of PRA methodology for risk management and regulatory applications in the U.S. nuclear industry. The new PRA methodology centers on the development of This paper discusses the time-dependent configuration risk profile for evaluating the effectiveness of operational risk management programs at U.S. nuclear power plants. Configuration-risk profiles have been used as risk-information tools for (1) a better understanding of the impact of daily operational activities on plant safety, and (2) proactive planning of operational activities to manage risk. Trial applications of the methodology were undertaken to demonstrate that configuration-risk profiles can be developed routinely, and can be useful for various industry and regulatory applications. Lessons learned include a better understanding of the issues and characteristics of PRA models available to industry, and identifying the attributes and pitfalls in the developement of risk profiles

  13. Information security risk management and incompatible parts of organization

    Energy Technology Data Exchange (ETDEWEB)

    Talabeigi, E.; Naeeini, S.G.J.

    2016-07-01

    Purpose: we prepared a questionnaire to evaluate Incompatible parts and also risk management in University of Science and Technology E-Learning Center and studying the Incompatible parts impacts on utility of organization. Design/methodology/approach: By using coalitional game theory we present a new model to recognize the degrees of incompatibility among independent divisions of an organization with dependent security assets. Based on positive and negative interdependencies in the parts, the model provides how the organization can decrease the security risks through non-cooperation rather than cooperation. we implement the proposed model of this paper by analyzing the data which have been provided by questionnaires from different three managers' ideas of Iran University of Science and Technology E-Learning Center located in Iran University of Science and Technology, Tehran, Iran. Findings: In general, by collecting data and analyzing them, the survey showed that Incompatible parts of organizations have negative impacts on utility of organization risk management process. Furthermore, it adds values to other organizations and provides the best practices in planning, developing, implementing and monitoring risk management in organizations. Research limitations/implications: Since Information security and also Risk Management are still areas which need to improve in some Iranian universities, we couldn’t consider them in our analysis. On the other hand, due to questionnaire limitation, the study’s sample size is 1. This size may be considered large for our statistical analysis. Originality/value: The main contribution of this paper is to propose a model for non-cooperation among a number of divisions in a organization and using risk management factors.

  14. Information security risk management and incompatible parts of organization

    International Nuclear Information System (INIS)

    Talabeigi, E.; Naeeini, S.G.J.

    2016-01-01

    Purpose: we prepared a questionnaire to evaluate Incompatible parts and also risk management in University of Science and Technology E-Learning Center and studying the Incompatible parts impacts on utility of organization. Design/methodology/approach: By using coalitional game theory we present a new model to recognize the degrees of incompatibility among independent divisions of an organization with dependent security assets. Based on positive and negative interdependencies in the parts, the model provides how the organization can decrease the security risks through non-cooperation rather than cooperation. we implement the proposed model of this paper by analyzing the data which have been provided by questionnaires from different three managers' ideas of Iran University of Science and Technology E-Learning Center located in Iran University of Science and Technology, Tehran, Iran. Findings: In general, by collecting data and analyzing them, the survey showed that Incompatible parts of organizations have negative impacts on utility of organization risk management process. Furthermore, it adds values to other organizations and provides the best practices in planning, developing, implementing and monitoring risk management in organizations. Research limitations/implications: Since Information security and also Risk Management are still areas which need to improve in some Iranian universities, we couldn’t consider them in our analysis. On the other hand, due to questionnaire limitation, the study’s sample size is 1. This size may be considered large for our statistical analysis. Originality/value: The main contribution of this paper is to propose a model for non-cooperation among a number of divisions in a organization and using risk management factors.

  15. Modelling and Risk Management in the Offshore and Marine Industry Supply Chain

    Directory of Open Access Journals (Sweden)

    Carman Lee

    2012-03-01

    Full Text Available Supply chain risk management is primarily a process that involves the identification, assessment and mitigation of risks that arise in a particular supply chain system. Pertaining to that, the offshore and marine industry is one of the many industries that have seldom received much consideration when it comes to management of the supply chain system. The rig building facet of the offshore and marine industry was thus chosen as the main focus of the project to manage the risks that arise in a particular oil rig building project. A risk mitigation plan framework was proposed to act as a guideline to identify as much risk as possible, eliminate trivial ones, and subsequently, prioritizing the remaining ones. The final step involves the formulation of a mathematical model based on the selected risk. In this case, the risk of raw material price fluctuation is studied. The demonstration of the Monte Carlo simulation using the Risk Solver program was also done to quantify the risks. Two case scenarios were then developed along with the implementation of risk management techniques in order to observe the effectiveness of the risk management of the overall rig building supply chain.

  16. New approach for risk based inspection of H2S based Process Plants

    International Nuclear Information System (INIS)

    Vinod, Gopika; Sharma, Pavan K.; Santosh, T.V.; Hari Prasad, M.; Vaze, K.K.

    2014-01-01

    Highlights: • Study looks into improving the consequence evaluation in risk based inspection. • Ways to revise the quantity factors used in qualitative approach. • New approach based on computational fluid dynamics along with probit mathematics. • Demonstrated this methodology along with a suitable case study for the said issue. - Abstract: Recent trend in risk informed and risk based approaches in life management issues have certainly put the focus on developing estimation methods for real risk. Idea of employing risk as an optimising measure for in-service inspection, termed as risk based inspection, was accepted in principle from late 80s. While applying risk based inspection, consequence of failure from each component needs to be assessed. Consequence evaluation in a Process Plant is a crucial task. It may be noted that, in general, the number of components to be considered for life management is very large and hence the consequence evaluation resulting from their failures (individually) is a laborious task. Screening of critical components is usually carried out using simplified qualitative approach, which primarily uses influence factors for categorisation. This necessitates logical formulation of influence factors and their ranges with a suitable technical basis for acceptance from regulators. This paper describes application of risk based inspection for H 2 S based Process Plant along with the approach devised for handling the influence factor related to the quantity of H 2 S released

  17. Uncertainty and sensitivity analysis of flood risk management decisions based on stationary and nonstationary model choices

    Directory of Open Access Journals (Sweden)

    Rehan Balqis M.

    2016-01-01

    Full Text Available Current practice in flood frequency analysis assumes that the stochastic properties of extreme floods follow that of stationary conditions. As human intervention and anthropogenic climate change influences in hydrometeorological variables are becoming evident in some places, there have been suggestions that nonstationary statistics would be better to represent the stochastic properties of the extreme floods. The probabilistic estimation of non-stationary models, however, is surrounded with uncertainty related to scarcity of observations and modelling complexities hence the difficulty to project the future condition. In the face of uncertain future and the subjectivity of model choices, this study attempts to demonstrate the practical implications of applying a nonstationary model and compares it with a stationary model in flood risk assessment. A fully integrated framework to simulate decision makers’ behaviour in flood frequency analysis is thereby developed. The framework is applied to hypothetical flood risk management decisions and the outcomes are compared with those of known underlying future conditions. Uncertainty of the economic performance of the risk-based decisions is assessed through Monte Carlo simulations. Sensitivity of the results is also tested by varying the possible magnitude of future changes. The application provides quantitative and qualitative comparative results that satisfy a preliminary analysis of whether the nonstationary model complexity should be applied to improve the economic performance of decisions. Results obtained from the case study shows that the relative differences of competing models for all considered possible future changes are small, suggesting that stationary assumptions are preferred to a shift to nonstationary statistics for practical application of flood risk management. Nevertheless, nonstationary assumption should also be considered during a planning stage in addition to stationary assumption

  18. Risk management for noncombustion wastes

    International Nuclear Information System (INIS)

    Connor, K.K.; Rice, J.S.

    1991-01-01

    The Noncombustion Waste Risk Management Project is designed to incorporate the insights and information developed in these projects into tools that will help utilities make better noncombustion waste management decisions. Specific project goals are to synthesize information useful to utilities on noncombustion wastes, emphasize waste reduction as a priority over end-of-pipe management, develop methods to manage the costs and risks associated with noncombustion wastes (e.g., direct costs, permitting costs, liability costs, public relations costs), develop software and documentation to deliver the information and analysis methods to the industry. This project was initiated EPRI's Environment Division in late 1988. The early phases of the project involved gathering information on current noncombustion waste management practices, specific utility problems and concerns with respect to these wastes, current and potential future regulations, and current and emerging management options. Recent efforts have focused on characterizing the direct and indirect (e.g., lawsuits, remedial action) costs of managing these wastes and on developing and implementing risk management methods for a subset of wastes. The remainder of this paper describes the specific issues addressed by and the results and insights from the three completed waste-specific studies

  19. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  20. Overview of the risk management approach to adaptation to climate change in Canada

    International Nuclear Information System (INIS)

    Noble, D.; Bruce, J.; Egener, M.

    2005-03-01

    Climate change poses risks related to frequent and extreme weather events, changes in water availability and changes in the performance of infrastructure systems. Risk management offers a decision-making framework to assist in the selection of optimal or cost-effective strategies using a systematic public process. Risks related to climate change are a new type of risk and are increasingly of concern for governments and citizens around the world. An introduction to risk-based approaches to climate change adaptation decision-making in Canada was presented in this paper. Steps in the risk management process were presented. Risk management approaches from various countries were reviewed, including the Canadian Standards Association's (CSA) national risk management guideline; the Government of Canada's Integrated Risk Management Framework; the Caribbean Risk Management Guideline; World Bank risk management strategies for adaptation to climate change; and the United Kingdom Climate Impacts Program. Details of a study conducted by the United Kingdom Department for Environment, Food, and Rural Affairs to explore the implications of climate change were also presented. Vulnerabilities of response mechanisms to climate change and the interrelations of public systems were reviewed. Issues concerning infrastructure renewal and development were examined, as well as emergency planning and management strategies. It was concluded that the development of training materials and tools for decision-makers in Canada is needed. A climate change risk management planning guidebook was proposed. refs., tabs., figs

  1. Scope of environmental risk management

    Energy Technology Data Exchange (ETDEWEB)

    O' Riordan, T

    1979-01-01

    Environmental risk management embraces three techniques for project appraisal: cost/benefit analysis, environmental impact analysis and risk assessment. It also explicitly relates scientific investigations to political judgments, sometimes so closely that the two cannot be separated. Indeed it is now apparent that environmental risk management encompasses procedures both to review the relative merits and priorities of policies as well as to appraise the environmental risks of particular schemes. Until recently this relationship has not been fully appreciated, so much imagination and innovation is still required to develop the most-suitable mechanisms for review.

  2. Risk Management in the Agri-food Sector

    Directory of Open Access Journals (Sweden)

    Hrabrin Bachev

    2013-03-01

    Full Text Available This paper incorporates the interdisciplinary New Institutional Economics in a comprehensive framework for analyzing risk management in the agri-food sector. First, it specifies the diverse types of agri-food risks (natural, technical, behavioral, economic, policy, etc. and the modes of their management (market, private, public, and hybrid. Second, it defines the efficiency of risk management and identifies the factors (personal, institutional, dimensional, technological, and natural of governance choice. Next, it presents stages in the analysis of risk management and the improvement of public intervention in the governance of risk. Finally, it identifies the contemporary opportunities and challenges for risk governance in the agri-food chain.

  3. Managing total corporate electricity/energy market risks

    International Nuclear Information System (INIS)

    Henney, A.; Keers, G.

    1998-01-01

    The banking industry has developed a tool kit of very useful value at risk techniques for hedging risk, but these techniques must be adapted to the special complexities of the electricity market. This paper starts with a short history of the use of value-at-risk (VAR) techniques in banking risk management and then examines the specific and, in many instances, complex risk management challenges faced by electric companies from the behavior of prices in electricity markets and from the character of generation and electric retailing risks. The third section describes the main methods for making VAR calculations along with an analysis of their suitability for analyzing the risks of electricity portfolios and the case for using profit at risk and downside risk as measures of risk. The final section draws the threads together and explains how to look at managing total corporate electricity market risk, which is a big step toward managing total corporate energy market risk

  4. Quantification of Technology Innovation Usinga Risk-Based Framework

    OpenAIRE

    Gerard E. Sleefe

    2010-01-01

    There is significant interest in achieving technology innovation through new product development activities. It is recognized, however, that traditional project management practices focused only on performance, cost, and schedule attributes, can often lead to risk mitigation strategies that limit new technology innovation. In this paper, a new approach is proposed for formally managing and quantifying technology innovation. This approach uses a risk-based framework that s...

  5. The concept of ignorance in a risk assessment and risk management context

    International Nuclear Information System (INIS)

    Aven, T.; Steen, R.

    2010-01-01

    There are many definitions of ignorance in the context of risk assessment and risk management. Most refer to situations in which there are lack of knowledge, poor basis for probability assignments and possible outcomes not (fully) known. The purpose of this paper is to discuss the ignorance concept in this setting. Based on a set of risk and uncertainty features, we establish conceptual structures characterising the level of ignorance. These features include the definition of chances (relative frequency-interpreted probabilities) and the existence of scientific uncertainties. Based on these structures, we suggest a definition of ignorance linked to scientific uncertainties, i.e. the lack of understanding of how consequences of the activity are influenced by the underlying factors. In this way, ignorance can be viewed as a condition for applying the precautionary principle. The discussion is also linked to the use and boundaries of risk assessments in the case of large uncertainties, and the methods for classifying risk and uncertainty problems.

  6. Improving Operational Risk Management Using Business Performance Management Technologies

    Directory of Open Access Journals (Sweden)

    Bram Pieket Weeserik

    2018-02-01

    Full Text Available Operational Risk Management (ORM comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM technologies are believed to provide a solution for effective Operational Risk Management by offering several combined technologies including: work flow, data warehousing, (advanced analytics, reporting and dashboards. BPM technologies can be integrated with an organization’s Planning & Control cycle and related to strategic objectives. This manuscript aims to show how ORM can benefit from BPM technologies via the development and practical validation of a new maturity model. The B4ORM maturity model was developed following the Design Science Research approach. The maturity model relates specific maturity levels of ORM processes with BPM technologies applicable for a specific maturity stage. There appears to be a strong relationship (0.78 with ORM process maturity and supporting BPM technologies. The B4ORM maturity model as described in this manuscript provides an ideal path of BPM technologies related to six distinctive stages of ORM, leading towards technologies suitable for continuous improvement of ORM processes and organization-wide integration.

  7. Air pollution and public health: a guidance document for risk managers.

    Science.gov (United States)

    Craig, Lorraine; Brook, Jeffrey R; Chiotti, Quentin; Croes, Bart; Gower, Stephanie; Hedley, Anthony; Krewski, Daniel; Krupnick, Alan; Krzyzanowski, Michal; Moran, Michael D; Pennell, William; Samet, Jonathan M; Schneider, Jurgen; Shortreed, John; Williams, Martin

    2008-01-01

    This guidance document is a reference for air quality policymakers and managers providing state-of-the-art, evidence-based information on key determinants of air quality management decisions. The document reflects the findings of five annual meetings of the NERAM (Network for Environmental Risk Assessment and Management) International Colloquium Series on Air Quality Management (2001-2006), as well as the results of supporting international research. The topics covered in the guidance document reflect critical science and policy aspects of air quality risk management including i) health effects, ii) air quality emissions, measurement and modeling, iii) air quality management interventions, and iv) clean air policy challenges and opportunities.

  8. A GIS-based multicriteria evaluation for aiding risk management Pinus pinaster Ait. forests: a case study in Corsican Island, western Mediterranean Region.

    Science.gov (United States)

    Pasqualini, Vanina; Oberti, Pascal; Vigetta, Stéphanie; Riffard, Olivier; Panaïotis, Christophe; Cannac, Magali; Ferrat, Lila

    2011-07-01

    Forest management can benefit from decision support tools, including GIS-based multicriteria decision-aiding approach. In the Mediterranean region, Pinus pinaster forests play a very important role in biodiversity conservation and offer many socioeconomic benefits. However, the conservation of this species is affected by the increase in forest fires and the expansion of Matsucoccus feytaudi. This paper proposes a methodology based on commonly available data for assessing the values and risks of P. pinaster forests and to generating maps to aid in decisions pertaining to fire and phytosanitary risk management. The criteria for assessing the values (land cover type, legislative tools for biodiversity conservation, environmental tourist sites and access routes, and timber yield) and the risks (fire and phytosanitation) of P. pinaster forests were obtained directly or by considering specific indicators, and they were subsequently aggregated by means of GIS-based multicriteria analysis. This approach was tested on the island of Corsica (France), and maps to aid in decisions pertaining to fire risk and phytosanitary risk (M. feytaudi) were obtained for P. pinaster forest management. Study results are used by the technical offices of the local administration-Corsican Agricultural and Rural Development Agency (ODARC)-for planning the conservation of P. pinaster forests with regard to fire prevention and safety and phytosanitary risks. The decision maker took part in the evaluation criteria study (weight, normalization, and classification of the values). Most suitable locations are given to target the public intervention. The methodology presented in this paper could be applied to other species and in other Mediterranean regions.

  9. A GIS-Based Multicriteria Evaluation for Aiding Risk Management Pinus pinaster Ait. Forests: A Case Study in Corsican Island, Western Mediterranean Region

    Science.gov (United States)

    Pasqualini, Vanina; Oberti, Pascal; Vigetta, Stéphanie; Riffard, Olivier; Panaïotis, Christophe; Cannac, Magali; Ferrat, Lila

    2011-07-01

    Forest management can benefit from decision support tools, including GIS-based multicriteria decision-aiding approach. In the Mediterranean region, Pinus pinaster forests play a very important role in biodiversity conservation and offer many socioeconomic benefits. However, the conservation of this species is affected by the increase in forest fires and the expansion of Matsucoccus feytaudi. This paper proposes a methodology based on commonly available data for assessing the values and risks of P. pinaster forests and to generating maps to aid in decisions pertaining to fire and phytosanitary risk management. The criteria for assessing the values (land cover type, legislative tools for biodiversity conservation, environmental tourist sites and access routes, and timber yield) and the risks (fire and phytosanitation) of P. pinaster forests were obtained directly or by considering specific indicators, and they were subsequently aggregated by means of GIS-based multicriteria analysis. This approach was tested on the island of Corsica (France), and maps to aid in decisions pertaining to fire risk and phytosanitary risk ( M. feytaudi) were obtained for P. pinaster forest management. Study results are used by the technical offices of the local administration— Corsican Agricultural and Rural Development Agency (ODARC)—for planning the conservation of P. pinaster forests with regard to fire prevention and safety and phytosanitary risks. The decision maker took part in the evaluation criteria study (weight, normalization, and classification of the values). Most suitable locations are given to target the public intervention. The methodology presented in this paper could be applied to other species and in other Mediterranean regions.

  10. Internal audit risk management in metropolitan municipalities

    Directory of Open Access Journals (Sweden)

    Christo Ackermann

    2016-07-01

    Full Text Available Internal audit functions (IAFs of organisations are regarded as crucial components of the combined assurance model, alongside the audit committee, management and external auditors. The combined assurance model aims at having integrated and aligned assurance in organisations with the overall aim of maximising risk and governance oversight and control efficiencies. In this regard, internal audit plays a crucial role, insofar as it consists of experts in risk, governance and control consultancy who provide assurance to senior management and the audit committee. Audit committees are dependent on internal audit for information and their effectiveness revolves around a strong and well-resourced internal audit function which is able to aid audit committees to meet their oversight responsibilities. There is thus a growing demand for managing risk through the process of risk management and internal audit is in a perfect position to assist with the improvement of such processes. If internal auditors wish to continue being an important aspect of the combined assurance model, they need to address the critical area, amongst others, of risk management as part of their work. If not, it follows that the board, audit committees and other levels of management will remain uninformed on the status of these matters which, in turn, will negatively impact the ability of these stakeholders to discharge their responsibilities. This study therefore focuses on analysing the functioning of IAFs, with specific reference to their risk management mandate. The study followed a mixed method approach to describe internal audits risk management functioning in the big eight metropolitan municipalities in South Africa. The results show that internal audit provide a broad scope of risk management work which assist senior management in the discharge of their responsibilities. However, in the public eye, internal audits risk management functioning is scant

  11. Active Risk Management and Banking Stability

    NARCIS (Netherlands)

    Silva Buston, C.F.

    2013-01-01

    Abstract: This paper analyzes the net impact of two opposing effects of active risk management at banks on their stability: higher risk-taking incentives and better isolation of credit supply from varying economic conditions. We present a model where banks actively manage their portfolio risk by

  12. The process of Risk management for E-business

    Directory of Open Access Journals (Sweden)

    Erion Lekaj

    2017-07-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of an IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted soft ware.

  13. [New approach for managing microbial risks in food].

    Science.gov (United States)

    Augustin, Jean-Christophe

    2015-01-01

    The aim of the food legislation is to ensure the protection of human health. Traditionally, the food legislation requires food business operators to apply good hygiene practices and specific procedures to control foodborne pathogens. These regulations allowed reaching a high level of health protection. The improvement of the system will require risk-based approaches. Firstly, risk assessment should allow the identification of high-risk situations where resources should be allocated for a better targeting of risk management. Then, management measures should be adapted to the health objective. In this approach, the appropriate level of protection is converted intofood safety and performance objectives on the food chain, i.e., maximum microbial contamination to fulfil the acceptable risk level. When objectives are defined, the food business operators and competent authorities can identify control options to comply with the objectives and establish microbiological criteria to verify compliance with these objectives. This approach, described for approximately 10 years, operative thanks to the development of quantitative risk assessment techniques, is still difficult to use in practical terms since it requires a commitment of competent authorities to define the acceptable risk and needs also the implementation of sometimes complex risk models.

  14. Coastal Risk Management in a Changing Climate

    DEFF Research Database (Denmark)

    Existing coastal management and defense approaches are not well suited to meet the challenges of climate change and related uncertanities. Professionals in this field need a more dynamic, systematic and multidisciplinary approach. Written by an international group of experts, "Coastal Risk...... Management in a Changing Climate" provides innovative, multidisciplinary best practices for mitigating the effects of climate change on coastal structures. Based on the Theseus program, the book includes eight study sites across Europe, with specific attention to the most vulnerable coastal environments...... such as deltas, estuaries and wetlands, where many large cities and industrial areas are located. Integrated risk assessment tools for considering the effects of climate change and related uncertainties. Presents latest insights on coastal engineering defenses. Provides integrated guidelines for setting up...

  15. GFC-Robust Risk Management Strategies under the Basel Accord

    NARCIS (Netherlands)

    M.J. McAleer (Michael); J.A. Jiménez-Martín (Juan-Ángel); T. Pérez-Amaral (Teodosio)

    2010-01-01

    textabstractA risk management strategy is proposed as being robust to the Global Financial Crisis (GFC) by selecting a Value-at-Risk (VaR) forecast that combines the forecasts of different VaR models. The robust forecast is based on the median of the point VaR forecasts of a set of conditional

  16. Criticality Risk Management: Why Analysis of Operating Practices Matters

    International Nuclear Information System (INIS)

    Menuet, L.; Tasset, D.; Hebraud, C.

    2016-01-01

    The criticality risk is an unwanted neutron chain reaction that could lead, if not under control, to a criticality accident resulting in a high release of energy accompanied by an intense emission of neutron and gamma radiation. Thus, the management of criticality risk in Fuel Cycle Facilities relies mainly on a set of prescriptions and requirements established by the licencees for achieving safety objectives. This paper intends to show that, beyond prescriptions and requirements, a socio-technical approach is essential to define a relevant set of criticality safety rules favouring efficient and safe human activities. Indeed, a thorough knowledge of staff operating practices, beyond contributing significantly to the definition of appropriate technical and organizational provisions, enhances safety management combining “rule-based safety” and “managed safety”. Rule-based safety (top down definition of the rules) can be achieved by anticipating undesirable situations and defining provisions to avoid and manage them in daily practices. On the other hand, managed safety (integration of local characteristics) develops the sociotechnical system capacity to anticipate, recognise and formulate appropriate responses to unexpected scenarios that were not foreseen by the organization, or to rules that are not applicable to the operational realities. Thus, an effective safety management relies on human expertise, on the skills of individuals, on the quality of initiatives, and on the way teams and organizations perform the operations on a daily basis, interact and coordinate to integrate and regulate both ruled-based safety and managed safety.

  17. Risk management abilities in multimodal maritime supply chains: Visibility and control perspectives.

    Science.gov (United States)

    Vilko, Jyri; Ritala, Paavo; Hallikas, Jukka

    2016-11-29

    Supply chain complexity and disintegration lead to increased uncertainty from a stakeholders' perspective, which is emerging as one of the major challenges of risk management. The ability to identify risks has weakened, as the responsibility of supply chain risk management is handed over to outside service providers. Regardless, the risks, their visibility and their impact depend on the position of the companies in the supply chain. The actors in the chain must therefore collaborate to create effective risk management conditions. This challenging situation is especially pronounced in multimodal maritime supply chains, where the risks and actor focality are high. This paper contributes to current risk management literature by providing a holistic and systemic view of risk visibility and control in maritime supply chains. The study employs broad-based, qualitative interview data collected from actors operating in southern Finland and the Gulf of Finland as well as an expert-panel assessment of the related risk management abilities. The results show a high level of variance in the level of risk identification and visibility between the actors in question. This further suggests that collaboration in supply chain risk management is essential, as an awareness of the risks and their control mechanisms do not necessarily reside in the same company. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Risk management for sulfur dioxide abatement under multiple uncertainties

    Science.gov (United States)

    Dai, C.; Sun, W.; Tan, Q.; Liu, Y.; Lu, W. T.; Guo, H. C.

    2016-03-01

    In this study, interval-parameter programming, two-stage stochastic programming (TSP), and conditional value-at-risk (CVaR) were incorporated into a general optimization framework, leading to an interval-parameter CVaR-based two-stage programming (ICTP) method. The ICTP method had several advantages: (i) its objective function simultaneously took expected cost and risk cost into consideration, and also used discrete random variables and discrete intervals to reflect uncertain properties; (ii) it quantitatively evaluated the right tail of distributions of random variables which could better calculate the risk of violated environmental standards; (iii) it was useful for helping decision makers to analyze the trade-offs between cost and risk; and (iv) it was effective to penalize the second-stage costs, as well as to capture the notion of risk in stochastic programming. The developed model was applied to sulfur dioxide abatement in an air quality management system. The results indicated that the ICTP method could be used for generating a series of air quality management schemes under different risk-aversion levels, for identifying desired air quality management strategies for decision makers, and for considering a proper balance between system economy and environmental quality.

  19. Surface water flood risk and management strategies for London: An Agent-Based Model approach

    Directory of Open Access Journals (Sweden)

    Jenkins Katie

    2016-01-01

    Full Text Available Flooding is recognised as one of the most common and costliest natural disasters in England. Flooding in urban areas during heavy rainfall is known as ‘surface water flooding’, considered to be the most likely cause of flood events and one of the greatest short-term climate risks for London. In this paper we present results from a novel Agent-Based Model designed to assess the interplay between different adaptation options, different agents, and the role of flood insurance and the flood insurance pool, Flood Re, in the context of climate change. The model illustrates how investment in adaptation options could reduce London’s surface water flood risk, today and in the future. However, benefits can be outweighed by continued development in high risk areas and the effects of climate change. Flood Re is beneficial in its function to provide affordable insurance, even under climate change. However, it offers no additional benefits in terms of overall risk reduction, and will face increasing pressure due to rising surface water flood risk in the future. The modelling approach and findings are highly relevant for reviewing the proposed Flood Re scheme, as well as for wider discussions on the potential of insurance schemes, and broader multi-sectoral partnerships, to incentivise flood risk management in the UK and internationally.

  20. Information risk management a practitioner's guide

    CERN Document Server

    Sutton, David

    2014-01-01

    Information risk management (IRM) is about identifying, assessing and prioritising risks to keep information secure and available. This accessible book provides practical guidance to the principles and development of a strategic approach to an IRM programme. The only textbook for the BCS Practitioner Certificate in Information Risk Management.

  1. CEA - Assessment of risk management 2013

    International Nuclear Information System (INIS)

    Bigot, Bernard; Bonnevie, Edwige; Maillot, Bernard

    2014-06-01

    After some introducing texts by CEA managers, this report proposes a rather detailed overview and presentation of CEA activities, objectives and obtained results in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transports of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal controls and audits, activity of the risk management department, CEA activities from research to industry

  2. Methods of assessment and management of enterprise risks

    Directory of Open Access Journals (Sweden)

    I. A. Kiseleva

    2017-01-01

    Full Text Available The article is devoted to the actual topic of our time – the management of business risks. An integral part of professional risk management is to identify the nature of the object of management in the sphere of economy. Since the domestic theory of risk management is under development, the problem of a clear comprehensive definition of risk becomes now of particular relevance. The article discusses the basic concepts of risk management; studied its components in the business activities; reflected system and risk management principles; The basic types of risks in business. A organizational and economic mechanism of enterprise risk assessment. Practical advice on risk management. Entrepreneurship without risk does not exist. With the development of market economy the specific entrepreneur determines the methods that will work, and they all lead to entrepreneurial risks. The level of threats on the market today, above the level of potential profits. It is concluded that it is impossible to increase revenue without increasing the risk or reduce risk without reducing income. The lower range of the probability distribution of expected returns relative to its mean value, the lower the risk associated with this operation. Avoid risk in business is almost impossible, but you can reduce this risk. And it depends on how professionally and correctly operates the entrepreneur, what kind of strategy he will choose to reduce the appearance of risk.

  3. [Risk Management: concepts and chances for public health].

    Science.gov (United States)

    Palm, Stefan; Cardeneo, Margareta; Halber, Marco; Schrappe, Matthias

    2002-01-15

    Errors are a common problem in medicine and occur as a result of a complex process involving many contributing factors. Medical errors significantly reduce the safety margin for the patient and contribute additional costs in health care delivery. In most cases adverse events cannot be attributed to a single underlying cause. Therefore an effective risk management strategy must follow a system approach, which is based on counting and analysis of near misses. The development of defenses against the undesired effects of errors should be the main focus rather than asking the question "Who blundered?". Analysis of near misses (which in this context can be compared to indicators) offers several methodological advantages as compared to the analysis of errors and adverse events. Risk management is an integral element of quality management.

  4. Managing Risk to the Patient: Recoding Quality Risk Management for the Pharmaceutical and Biopharmaceutical Industries

    OpenAIRE

    Waldron, Kelly

    2017-01-01

    This thesis explores the application of quality risk management (QRM) in pharmaceutical and biopharmaceutical companies and its effectiveness at managing risk to the patient. The objective of the research described in this thesis was to characterize a maturity state of QRM implementation in which the patient is adequately protected from the risks associated with medicinal products of inadequate quality. The research was conducted over three phases: first, to determine whether patients are bet...

  5. Designing and evaluating risk-based surveillance systems

    DEFF Research Database (Denmark)

    Willeberg, Preben; Nielsen, Liza Rosenbaum; Salman, Mo

    2012-01-01

    Risk-based surveillance systems reveal occurrence of disease or infection in a sample of population units, which are selected on the basis of risk factors for the condition under study. The purpose of such systems for supporting practical animal disease policy formulations and management decisions...... with prudent use of resources while maintaining acceptable system performance. High-risk category units are selected for testing by identification of the presence of specific high-risk factor(s), while disregarding other factors that might also influence the risk. On this basis we argue that the most...... applicable risk estimate for use in designing and evaluating a risk-based surveillance system would be a crude (unadjusted) relative risk, odds ratio or apparent prevalence. Risk estimates found in the published literature, however, are often the results of multivariable analyses implicitly adjusting...

  6. Debris Flow Risk Management Framework and Risk Analysis in Taiwan, A Preliminary Study

    Science.gov (United States)

    Tsao, Ting-Chi; Hsu, Wen-Ko; Chiou, Lin-Bin; Cheng, Chin-Tung; Lo, Wen-Chun; Chen, Chen-Yu; Lai, Cheng-Nong; Ju, Jiun-Ping

    2010-05-01

    Taiwan is located on a seismically active mountain belt between the Philippine Sea plate and Eurasian plate. After 1999's Chi-Chi earthquake (Mw=7.6), landslide and debris flow occurred frequently. In Aug. 2009, Typhoon Morakot struck Taiwan and numerous landslides and debris flow events, some with tremendous fatalities, were observed. With limited resources, authorities should establish a disaster management system to cope with slope disaster risks more effectively. Since 2006, Taiwan's authority in charge of debris flow management, the Soil and Water Conservation Bureau (SWCB), completed the basic investigation and data collection of 1,503 potential debris flow creeks around Taiwan. During 2008 and 2009, a debris flow quantitative risk analysis (QRA) framework, based on landslide risk management framework of Australia, was proposed and conducted on 106 creeks of the 30 villages with debris flow hazard history. Information and value of several types of elements at risk (bridge, road, building and crop) were gathered and integrated into a GIS layer, with the vulnerability model of each elements at risk applied. Through studying the historical hazard events of the 30 villages, numerical simulations of debris flow hazards with different magnitudes (5, 10, 25, 50, 100 and 200 years return period) were conducted, the economic losses and fatalities of each scenario were calculated for each creek. When taking annual exceeding probability into account, the annual total risk of each creek was calculated, and the results displayed on a debris flow risk map. The number of fatalities and frequency were calculated, and the F-N curves of 106 creeks were provided. For F-N curves, the individual risk to life per year of 1.0E-04 and slope of 1, which matched with international standards, were considered to be an acceptable risk. Applying the results of the 106 creeks onto the F-N curve, they were divided into 3 categories: Unacceptable, ALARP (As Low As Reasonable Practicable) and

  7. A SURVEY OF INTERNATIONAL FINANCIAL RISK MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    SETHI Narayan

    2013-12-01

    Full Text Available Rising global competition, increasing deregulation, and introduction of innovative products have pushed financial risk management to the forefront of today's financial landscape. Identification of different types of risks and effective management of these risks in the international financial system would help to alleviate crisis, financial losses and also helpful to the long term success of all the financial institutions. The present study aims to analyze different types of risk management strategies and throws some light on challenges and opportunities regarding implementation of Basel-II in international financial system. The present paper also attempts to discuss the different methods and techniques used to measure financial risk management. There are three types of risk faced by all financial institutions: market risk, credit risk and operational risk. In commercial banking, credit risk is the biggest risk; in investment banking, its market risk; and in asset management, it’s operational risk.

  8. Accident Management ampersand Risk-Based Compliance With 40 CFR 68 for Chemical Process Facilities

    International Nuclear Information System (INIS)

    O'Kula, K.R.; Taylor, R.P. Jr.; Ashbaugh, S.G.

    1995-01-01

    A risk-based logic model is suggested as an appropriate basis for better predicting accident progression and ensuing source terms to the environment from process upset conditions in complex chemical process facilities. Under emergency conditions, decision-makers may use the Accident Progression Event Tree approach to identify the best countermeasure for minimizing deleterious consequences to receptor groups before the atmospheric release has initiated. It is concluded that the chemical process industry may use this methodology as a supplemental information provider to better comply with the Environmental Protection Agency's proposed 40 CFR 68 Risk Management Program rule. An illustration using a benzene-nitric acid potential interaction demonstrates the value of the logic process. The identification of worst-case releases and planning for emergency response are improved through these methods, at minimum. It also provides a systematic basis for prioritizing facility modifications to correct vulnerabilities

  9. The application of holistic risk management in the banking industry

    Directory of Open Access Journals (Sweden)

    J. Chibayambuya

    2007-12-01

    Full Text Available Purpose: The application of holistic risk management is fast becoming a standard measure of good governance in the business arena. What role can holistic risk management play in the management of risk in the financial services industry? The aim of this paper is to propose a holistic risk management framework for the management of risk. Design/Methodology/Approach: A comprehensive framework that covers the holistic view risk management is proposed/developed out of an extensive literature review. Findings: Given the deliberations of various frameworks, a holistic risk management is proposed. The proposed framework ensures that all components of risk management are taken into account when strategizing for risk management in general and holistic risk management in particular; thereby improving the management of risk in the banking industry. Implications: The article proposes a holistic approach to risk management which takes into account all the facets of risk management, e.g. analyzing, planning, strategy, communication, implementation, motivation, systems review and plan modification. This holistic approach, when implemented in the banking industry, can have a significant impact on the improved management of risk. Originality/Value: The new proposed holistic risk management framework offers a fresh perspective of strategizing for risk management in terms of risk analysis, risk planning, risk strategy, risk communication, risk implementation, risk motivation, risk review and risk plan modification.

  10. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  11. Application of an integrated risk management system for improved maintenance in industrial plants

    Energy Technology Data Exchange (ETDEWEB)

    Jovanovic, A.; Balos, D.T.; Vinod, G.; Balos, D. [Steinbeis Advanced Risk Technologies, Stuttgart (Germany); Stanojevic, P. [NIS - Petroleum Industry of Serbia, Novi Sad (Serbia)

    2007-06-15

    The paper presents the application of the Integrated Risk Management System (iRiS) and its application to the areas of Risk Based Inspection (RBI), Reliability Centered Maintenance (RCM), Root Cause Failure Analysis (RCFA) and Health, Safety and Environment (HSE). The web-based system integrates also the aspects of risk management related to data acquisition and management and interactive reporting and controlled use of single parts of the system by various individual users and/or user levels. A complementing part of the system is a tool for project management including the documentation and activity management, as well as scheduling and e-education and e-training. The complementing parts of the system are the CMMS part (maintenance management), the extension of HSE to HSSE (including the 'security' aspects and providing links to the disaster management system) and further interfacing towards general management system and process modeling and management systems. Experiences from the applications of system in Hungary (at over 60 units) and in Serbia, for several refineries and further units in upstream and downstream, are presented in the paper. (orig.)

  12. Application of risk-based assessment and management to riverbank filtration sites in India.

    Science.gov (United States)

    Bartak, Rico; Page, Declan; Sandhu, Cornelius; Grischek, Thomas; Saini, Bharti; Mehrotra, Indu; Jain, Chakresh K; Ghosh, Narayan C

    2015-03-01

    This is the first reported study of a riverbank filtration (RBF) scheme to be assessed following the Australian Guidelines for Managed Aquifer Recharge. A comprehensive staged approach to assess the risks from 12 hazards to human health and the environment has been undertaken. Highest risks from untreated ground and Ganga River water were identified with pathogens, turbidity, iron, manganese, total dissolved solids and total hardness. Recovered water meets the guideline values for inorganic chemicals and salinity but exceeds limits for thermotolerant coliforms frequently. A quantitative microbial risk assessment undertaken on the water recovered from the aquifer indicated that the residual risks of 0.00165 disability-adjusted life years (DALYs) posed by the reference bacteria Escherichia coli O157:H7 were below the national diarrhoeal incidence of 0.027 DALYs and meet the health target in this study of 0.005 DALYs per person per year, which corresponds to the World Health Organization (WHO) regional diarrhoeal incidence in South-East Asia. Monsoon season was a major contributor to the calculated burden of disease and final DALYs were strongly dependent on RBF and disinfection pathogen removal capabilities. Finally, a water safety plan was developed with potential risk management procedures to minimize residual risks related to pathogens.

  13. A new perspective on Renn and Klinke's approach to risk evaluation and management

    International Nuclear Information System (INIS)

    Kristensen, V.; Aven, T.; Ford, D.

    2006-01-01

    In this paper we discuss Renn and Klinke's approach for risk evaluation and selection of risk management strategies. The main focus in the discussion is the foundational basis and the understanding of what risk is, and how a different foundational basis may simplify and improve the characterization of risk. We will present and discuss an alternative set of characteristics, and give some recommendations with respect to selection of risk management strategies based on different values or magnitudes of these characteristics. We believe that the main focus when describing and managing risk should be the potential consequences, represented by observable quantities, and the uncertainty related to their future values

  14. Managing power risk

    International Nuclear Information System (INIS)

    Rudd, D.C.

    1999-01-01

    Issues regarding the management of financial risks in the electric power market were discussed. The nature of the risk was defined for electricity producers, local utilities, traders/dealers, and brokers, each of which are exposed to different types of risks with the exception of credit risk, which is common to all. The main features of options, swaps, CFDs, bilateral financial contracts, futures contracts and the terms of the NYMEX electricity contract were outlined. Basic derivative strategies, the role of the broker, the elements of emissions trading, and trading strategies for consumers were also explained. 3 fig

  15. Accommodating the Challenges of Climate Change Adaptation and Governance in Conventional Risk Management: Adaptive Collaborative Risk Management (ACRM)

    OpenAIRE

    Bradley May; Ryan Plummer

    2011-01-01

    Risk management is a well established tool for climate change adaptation. It is facing new challenges with the end of climate stationarity and the need to meaningfully engage people in governance issues. The ways in which conventional approaches to risk management can respond to these challenges are explored. Conventional approaches to risk management are summarized, the manner in which they are being advanced as a tool for climate change adaptation is described, and emerging themes in risk m...

  16. Taking risk assessment and management to the next level - 59395

    International Nuclear Information System (INIS)

    Nelson, Jerel; Morton, Russel Lee; Castillo, Carlos; Dyer, George; Johnson, Natalie; McSwain, James T.; Kruskall, Gary Nick

    2012-01-01

    Document available in abstract form only. Full text of publication follows: A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell into two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact

  17. Natural-technological risk assessment and management

    Science.gov (United States)

    Burova, Valentina; Frolova, Nina

    2016-04-01

    EM-DAT statistical data on human impact and economic damages in the 1st semester 2015 are the highest since 2011: 41% of disasters were floods, responsible for 39% of economic damage and 7% of events were earthquakes responsible for 59% of total death toll. This suggests that disaster risk assessment and management still need to be improved and stay the principle issue in national and international related programs. The paper investigates the risk assessment and management practice in the Russian Federation at different levels. The method is proposed to identify the territories characterized by integrated natural-technological hazard. The maps of the Russian Federation zoning according to the integrated natural-technological hazard level are presented, as well as the procedure of updating the integrated hazard level taking into account the activity of separate processes. Special attention is paid to data bases on past natural and technological processes consequences, which are used for verification of current hazard estimation. The examples of natural-technological risk zoning for the country and some regions territory are presented. Different output risk indexes: both social and economic, are estimated taking into account requirements of end-users. In order to increase the safety of population of the Russian Federation the trans-boundaries hazards are also taken into account.

  18. Managing IT-related operational risks

    Directory of Open Access Journals (Sweden)

    Savić Ana

    2008-01-01

    Full Text Available Not so long ago, information technology (IT risk occupied a small corner of operational risk - the opportunity loss from a missed IT development deadline. Today, the success of an entire financial institution may lay on managing a broad landscape of IT risks. IT risk is a potential damage to an organization's value, resulting from inadequate managing of processes and technologies. IT risk includes the failure to respond to security and privacy requirements, as well as many other issues such as: human error, internal fraud through software manipulation, external fraud by intruders, obsolesce in applications and machines, reliability issues or mismanagement. The World Economic Forum provides best information about this problem. They rank a breakdown of critical information infrastructure among the most likely core global risks, with 10-20 % likelihood over the next 10 years and potential worldwide impact of $250 billion. Sustained investment in IT - almost $1.2 trillion or 29% of 2006 private-sector capital investment in the U.S. alone fuels growing exposure to IT risk. Greg Hughes, chief strategy officer in Symantec Corp. recently claimed "IT risk management is more than using technology to solve security problems. With proper planning and broad support, it can give an organization the confidence to innovate, using IT to outdistance competitors".

  19. Risk Management in Logystics Chains

    OpenAIRE

    Butrin, Andrey; Vikulov, Vladimir

    2013-01-01

    Article is devoted to risk management of supply chain. The authors considered indicators of supply chain risks, including risks caused by supplier. Authors formed a method of optimizing the level of supply chain risk in the integration with suppliers and customers.

  20. Coastal Risk Management in a Changing Climate

    DEFF Research Database (Denmark)

    Burcharth, Hans F.; Zanuttigh, Barbara; Andersen, Thomas Lykke

    2014-01-01

    Existing coastal management and defense approaches are not well suited to meet the challenges of climate change and related uncertanities. Professionals in this field need a more dynamic, systematic and multidisciplinary approach. Written by an international group of experts, Coastal Risk...... Management in a Changing Climate provides innovative, multidisciplinary best practices for mitigating the effects of climate change on coastal structures. Based on the Theseus program, the book includes eight study sites across Europe, with specific attention to the most vulnerable coastal environments...

  1. The Theme of Risk Management

    Directory of Open Access Journals (Sweden)

    Chua, D. K. H.

    2014-07-01

    Full Text Available The papers in this issue of the Journal come from different industry sectors, yet there can be a common theme that ties them together. Two of the papers address explicitly the issue of risk management, while the other three may be related to it in different degrees. One of the critical factors for project success is risk identification, as determined by Chua et al. (1999. The importance of risk management cannot be overemphasized. Failure to identify crucial risk elements in a project can lead to significant project failures in terms of cost and schedule.

  2. Risk management at GPU Nuclear

    International Nuclear Information System (INIS)

    Long, R.L.

    1991-01-01

    This paper reports on GPU Nuclear. Among other goals, it established the independence of key safety functions as highlighted by the lessons learned from the accident. In particular, an independent Nuclear Assurance Division was established which include Quality Assurance, Training and Education, Emergency Preparedness, and Nuclear Safety Assessment. The latter consisted of corporate and site independent-safety-review groups. As the GPU Nuclear organization matured, a mid-1987 reorganization created an even more focused Planning and Nuclear Safety Division bringing together Nuclear Safety Assessment with Licensing and Regulatory Affairs and Risk Management. The Risk Management Group (RMG), which began its work in fall 1987, was formed to develop a framework for proactive identification, evaluation, and cost-effective reduction and management of risks of all types. The RMG set out to learn as much as possible about risks and their management in nuclear and other high-technology industries. This began with a thorough literature search. It progressed to interviews with individuals and organizations which have demonstrated innovative ideas, experience, and reputations for safe and reliable operation

  3. Information security risk management and incompatible parts of organization

    Directory of Open Access Journals (Sweden)

    Elham Talabeigi

    2016-11-01

    Full Text Available Purpose: we prepared a questionnaire to evaluate Incompatible parts and also risk management in University of Science and Technology E-Learning Center and studying the Incompatible parts impacts on utility of organization. Design/methodology/approach: By using coalitional game theory we present a new model to recognize the degrees of incompatibility among independent divisions of an organization with dependent security assets. Based on positive and negative interdependencies in the parts, the model provides how the organization can decrease the security risks through non-cooperation rather than cooperation. we implement the proposed model of this paper by analyzing the data which have been provided by questionnaires from different three managers' ideas of Iran University of Science and Technology E-Learning Center located in Iran University of Science and Technology, Tehran, Iran. Findings: In general, by collecting data and analyzing them, the survey showed that Incompatible parts of organizations have negative impacts on utility of organization risk management process. Furthermore, it adds values to other organizations and provides the best practices in planning, developing, implementing and monitoring risk management in organizations. Research limitations/implications: Since Information security and also Risk Management are still areas which need to improve in some Iranian universities, we couldn’t consider them in our analysis. On the other hand, due to questionnaire limitation, the study’s sample size is 1. This size may be considered large for our statistical analysis. Originality/value:  The main contribution of this paper is to propose a model for non-cooperation among a number of divisions in a organization and using risk management factors.

  4. Overtopping hazards to port activities: Application of a new methodology to risk management (POrt Risk MAnagement Tool)

    International Nuclear Information System (INIS)

    Alises, Ana; Molina, Rafael; Gómez, Rebeca; Pery, Pascual; Castillo, Carmen

    2014-01-01

    In the past 20 years, the need of ports to serve a fleet whose dimensions are continuously increasing due to economies of scale, has derived on a port infrastructures growth with a trend to look for greater drafts at deeper waters and therefore the protection structures built in the last years have been increasingly exposed to severer maritime climate action. Consequently, overtopping phenomenon has been identified as a potential risk factor able to cause structural damages and operative failure modes to vulnerable economic activities located at these port facilities. Port activities must be developed ensuring operative and safety conditions what imply reducing uncertainties of overtopping phenomena by using prediction methods which may allow overtopping risk management. This paper provides a risk assessment methodology which is integrated into an overtopping risk management framework to cope with safety problems in port exploitation. Overtopping risk value is measured by combining probability of occurrence of an undesirable event together with its consequences, estimated in terms of costs or delays and given in base of the vulnerability of the affected port system. The development of this methodology is described and finally applied to a real case study what seems to reinforce the validity of the proposed method to overtopping risk assessment. - Highlights: • Infrastructure risk assessment involves both probabilistic and economic techniques. • Risk equation is posed by the combination of probability, vulnerability and cost. • Port infrastructures' vulnerability level depends on climate agents' action. • Economic value of natural hazards consequences is linked with vulnerability level. • Project planning process should be done taking into account the project's risk distribution

  5. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  6. Perceptions of food risk management among key stakeholders

    DEFF Research Database (Denmark)

    van Kleef, Ellen; Frewer, Lynn J.; Chryssochoidis, George M.

    2006-01-01

    In designing and implementing appropriate food risk management strategies, it is important to examine how key stakeholders perceive both the practice and effectiveness of food risk management.......In designing and implementing appropriate food risk management strategies, it is important to examine how key stakeholders perceive both the practice and effectiveness of food risk management....

  7. Economic optimisation of flood risk management projects

    NARCIS (Netherlands)

    Tsimopoulou, V.

    2015-01-01

    The Netherlands has developed a flood risk management policy based on an economic rationale. After the flood disaster of 1953, when a large area of the south-western part of the country was flooded and more than 1800 people lost their lives, the so-called Delta Committee was installed, whose main

  8. Rethinking 'risk' and self-management for chronic illness.

    Science.gov (United States)

    Morden, Andrew; Jinks, Clare; Ong, Bie Nio

    2012-02-01

    Self-management for chronic illness is a current high profile UK healthcare policy. Policy and clinical recommendations relating to chronic illnesses are framed within a language of lifestyle risk management. This article argues the enactment of risk within current UK self-management policy is intimately related to neo-liberal ideology and is geared towards population governance. The approach that dominates policy perspectives to 'risk' management is critiqued for positioning people as rational subjects who calculate risk probabilities and act upon them. Furthermore this perspective fails to understand the lay person's construction and enactment of risk, their agenda and contextual needs when living with chronic illness. Of everyday relevance to lay people is the management of risk and uncertainty relating to social roles and obligations, the emotions involved when encountering the risk and uncertainty in chronic illness, and the challenges posed by social structural factors and social environments that have to be managed. Thus, clinical enactments of self-management policy would benefit from taking a more holistic view to patient need and seek to avoid solely communicating lifestyle risk factors to be self-managed.

  9. The role of risk perception for risk management

    International Nuclear Information System (INIS)

    Renn, Ortwin

    1998-01-01

    Are risks social constructions of different societal actors that can be checked at best against standards of consistency, cohesion and internal conventions of deduction, but cannot claim any validity outside of the actor's logical framework? Or are technical estimates of risk representations of real hazards that can and will affect people as predicted by the statistical values, regardless of the beliefs or convictions of those who conduct the assessments? Which of the two sides one takes determines the legitimate function of risk perception for management purposes. The paper argues that both extremes, the constructivist and the realist perspective, miss the point, as risks are always mental representations of threats that are capable of claiming real losses. Over the last two decades, risk analysts have dealt with both sides of risk in an additive fashion. In times in which risk management has been under serious pressure to demonstrate effectiveness and cost-efficiency, the parallel approach of pleasing the technical elite and the public alike has lost legitimacy. In order to integrate risk assessment and perception, the paper analyses the strengths and weaknesses of each approach to risk analysis and highlights the potential contributions that the technical sciences and the social sciences can offer to risk management. Technical assessments provide the best estimate for judging the average probability of an adverse effect linked to an object or activity. First, public perception should govern the selection of criteria on which acceptability or tolerability are to be judged. Second, public input is needed to determine the trade-offs between criteria. Third, public preferences are needed to design resilient strategies for coping with remaining uncertainties. A public participation model is introduced that promises an integration of analytic knowledge and deliberative process involving those who will be affected by the respective risk

  10. Contextualising risk within enterprise risk management through the application of systems thinking

    CSIR Research Space (South Africa)

    Haywood, Lorren K

    2017-06-01

    Full Text Available New and emerging risks create growing uncertainty and unpredictability within enterprise risk management. While ISO 31000:2009 is a progressive risk management framework, it is limited in its guidance on how to contextualise complex risks...

  11. Risk management of smart grids based on managed charging of PHEVs and vehicle-to-grid strategy using Monte Carlo simulation

    International Nuclear Information System (INIS)

    Hashemi-Dezaki, Hamed; Hamzeh, Mohsen; Askarian-Abyaneh, Hossein; Haeri-Khiavi, Homayoun

    2015-01-01

    Highlights: • Actual distribution system is used to analyze the proposed methodology. • A novel charging management method for PHEVs has been introduced. • The well-being criteria have been provided in addition to reliability indices. • The uncertainty of results is analyzed in addition to expected average results. • System effects due to charging and penetration level of PHEVs are analyzed. - Abstract: The unmanaged charging of plug-in-hybrid-electric vehicles (PHEVs) may adversely affect electric grid reliability because a large amount of additional electrical energy is required to charge the PHEVs. In this paper, a comprehensive method to evaluate the system reliability concerning the stochastic modeling of PHEVs, renewable resources, availability of devices, etc. is proposed. In addition, a novel risk management method in order to reduce the negative PHEVs effects is introduced. This method, which consists of managed charging and vehicle-to-grid (V2G) scenarios, can be practically implemented in smart grids because the bidirectional-power-conversion technologies and two-way of both the power and data are applicable. The introduced method was applied to a real 20 kV network of the Hormozgan Regional Electric Company (HREC) of Iran which is considered as a pilot system for upgrading to smart distribution grid. The results showed that the smart grid’s adequacy was jeopardized by using the PHEVs without any managed charging schedule. The sensitivity analyses results illustrated that by using the risk management scenarios, not only did the PHEVs not compromise the system reliability, but also in the V2G scenario acted as storage systems and improved the well-being criteria and adequacy indices. The comparison between the results based on the proposed method and the other conventional approaches in addition to study of various parameters uncertainty emphasized the advantages of the proposed method

  12. Analysis of the effect of risk management practices on the performance of new product development programs

    DEFF Research Database (Denmark)

    Oehmen, Josef; Olechowski, Alison; Kenley, C. Robert

    2014-01-01

    Risk management is receiving much attention, as it is seen as a method to improve cost, schedule, and technical performance of new product development programs. However, there is a lack of empirical research that investigates the effective integration of specific risk management practices proposed...... skills and resources; (2) Tailor risk management to and integrate it with new product development; (3) Quantify impacts of risks on your main objectives; (4) Support all critical decisions with risk management results; (5) Monitor and review your risks, risk mitigation actions, and risk management...... by various standards with new product development programs and their association with various dimensions of risk management success. Based on a survey of 291 product development programs, this paper investigates the association of risk management practices with five categories of product development program...

  13. The Dutch risk management policy and its impact for radiation protection

    International Nuclear Information System (INIS)

    Brinkman, Rob; Bosnjakovic, Branko; Jongh, Paul de

    1989-01-01

    Since 1985 the environmental policy in the Netherlands is based on a quantitative risk management policy. This policy was developed for reasons of external safety and for the management of chemical substances in the environment. The experiences with this quantitative risk management policy are positive. An extension of the risk policy is currently in preparation: the risks of other aspects than the death of human beings will be included. For example, the risk of damage to the environmental production function of soils and water will be taken into account. Meanwhile, a policy whitebook on radiation protection standards is in preparation. In this whitebook the occupational and environmental aspects of radiation protection will be dealt with. The whitebook will be sent to Parliament in 1989. in the radiation protection policy to be developed there will be a strong relation between the quantitative risk management of the environmental policy and the system of radiation protection standards to be developed. In the paper some basic presumptions as well as the international context of changes in standard setting will be discussed. (author)

  14. Integrating Indigenous Knowledge in Climate Risk Management in ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    27 mars 2008 ... Integrating Indigenous Knowledge in Climate Risk Management in support of Community Based Adaptation. Traditionally, African farmers have used indigenous knowledge to understand weather and climate patterns and make decisions about crop and irrigation cycles. However, increased variability ...

  15. Methodical Approaches to Risk Management in a Regional Commercial Bank

    Directory of Open Access Journals (Sweden)

    Elena Vladimirovna Altukhova

    2016-03-01

    Full Text Available The article presents the results of the research of the methodological and information infrastructure of the integrated risk management in a regional commercial bank. Within the study of the general development tendencies of the regional banking services market, the most significant risks for a regional bank are revealed. The analysis is carried out on the basis of the stress testing technique developed at the Plekhanov Russian University of Economics. It is based on a technique of dynamic economic and mathematical modeling with the application of information technologies. The created combination of the methodological and instrumental tools allows to carry out the dynamic scenario analysis of the activity of a commercial bank for the identification of potential risks and for the development of the strategy of financial management reducing the potential risks and leveling the consequences of their realization. The received tool allows during the computer test to watch the predicted dynamics of the condition of the key indicators of the activity of a regional commercial bank changing under the influence of the exogenous regulatory measures and instruments of bank management applied to decrease risk and at the same time to introduce adjustments in the perspective strategy of management. As the result of the analysis, the universal management model of the main bank risks in a regional commercial bank within three alternative scenarios is created. The software product allowing to develop and acquire the practical skills of the students in banking is developed. It also may help to develop the methodological support for the regulation of the organizational procedures of risk management in a regional commercial bank. The received software product may be used in a system of the improving the professional skills, and also for obtaining the expected data in a risk management system in a regional commercial bank.

  16. To manage the ionizing radiations risks

    International Nuclear Information System (INIS)

    Metivier, H.; Romerio, F.

    2000-01-01

    Mister Romerio's work tackles the problem of controversy revealed by the experts in the field of estimation and management of ionizing radiations risks. The author describes the three paradigms at the base of the debate: the relationship without threshold (typified by the ICRP and its adepts), these ones that think that low doses risks are overestimated ( Medicine Academia for example) or that ones that believe that dose limits are too severe and induce unwarranted costs; then that ones that think that these risks are under-estimated and limits should be more reduced, even stop these practices that lead to public exposure to ionizing radiations. The author details the uncertainties about the risk estimations, refreshes the knowledge in radiation protection with the explanations of the different paradigms. At the end a table summarize the positions of the three paradigms

  17. Cyber Risk Management for Critical Infrastructure: A Risk Analysis Model and Three Case Studies.

    Science.gov (United States)

    Paté-Cornell, M-Elisabeth; Kuypers, Marshall; Smith, Matthew; Keller, Philip

    2018-02-01

    Managing cyber security in an organization involves allocating the protection budget across a spectrum of possible options. This requires assessing the benefits and the costs of these options. The risk analyses presented here are statistical when relevant data are available, and system-based for high-consequence events that have not happened yet. This article presents, first, a general probabilistic risk analysis framework for cyber security in an organization to be specified. It then describes three examples of forward-looking analyses motivated by recent cyber attacks. The first one is the statistical analysis of an actual database, extended at the upper end of the loss distribution by a Bayesian analysis of possible, high-consequence attack scenarios that may happen in the future. The second is a systems analysis of cyber risks for a smart, connected electric grid, showing that there is an optimal level of connectivity. The third is an analysis of sequential decisions to upgrade the software of an existing cyber security system or to adopt a new one to stay ahead of adversaries trying to find their way in. The results are distributions of losses to cyber attacks, with and without some considered countermeasures in support of risk management decisions based both on past data and anticipated incidents. © 2017 Society for Risk Analysis.

  18. INVENTORY AND RISK MANAGEMENT: DECREASING DELIVERY RISK OF PURCHASERS

    Directory of Open Access Journals (Sweden)

    Grzegorz MICHALSKI

    2008-12-01

    Full Text Available The basic financial purpose of an enterprise is maximization of its value. Inventory management should also contribute to realization of this fundamental aim. The enterprise value maximization strategy is executed with a focus on risk and uncertainty. This article presents the consequences for the recipients firm that can result from operating risk that is related to delivery risk generated by the suppliers. The present article offers a method that uses portfolio management theory to choose the suppliers.

  19. Management Ownership and Risk-Shifting Investment

    OpenAIRE

    Nobuyuki Teshima

    2012-01-01

    This study analyzes the relationship between management ownership and its risk-shifting incentive. We first present a simple model showing that the risk-shifting incentive of management of financially distressed firms increases as the management ownership of the firm increases. Empirically, we test the hypothesis that under the former Japanese Corporate Reorganization Law, firms with higher management ownership are more likely to use legal rather than private reorganization. Since the reorgan...

  20. Marine and Hydrokinetic Technology Development Risk Management Framework

    Energy Technology Data Exchange (ETDEWEB)

    Snowberg, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Weber, Jochem [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    Over the past decade, the global marine and hydrokinetic (MHK) industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed an MHK Risk Management Framework. By addressing uncertainties, the MHK Risk Management Framework increases the likelihood of successful development of an MHK technology. It covers projects of any technical readiness level (TRL) or technical performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over the development cycle. This framework is intended for the development and deployment of a single MHK technology—not for multiple device deployments within a plant. This risk framework is intended to meet DOE’s risk management expectations for the MHK technology research and development efforts of the Water Power Program (see Appendix A). It also provides an overview of other relevant risk management tools and documentation.1 This framework emphasizes design and risk reviews as formal gates to ensure risks are managed throughout the technology development cycle. Section 1 presents the recommended technology development cycle, Sections 2 and 3 present tools to assess the TRL and TPL of the project, respectively. Section 4 presents a risk management process with design and risk reviews for actively managing risk within the project, and Section 5 presents a detailed description of a risk registry to collect the risk management information into one living document. Section 6 presents recommendations for collecting and using lessons learned throughout the development process.