WorldWideScience

Sample records for risk evaluation methods

  1. Modified risk evaluation method

    International Nuclear Information System (INIS)

    Udell, C.J.; Tilden, J.A.; Toyooka, R.T.

    1993-08-01

    The purpose of this paper is to provide a structured and cost-oriented process to determine risks associated with nuclear material and other security interests. Financial loss is a continuing concern for US Department of Energy contractors. In this paper risk is equated with uncertainty of cost impacts to material assets or human resources. The concept provides a method for assessing the effectiveness of an integrated protection system, which includes operations, safety, emergency preparedness, and safeguards and security. The concept is suitable for application to sabotage evaluations. The protection of assets is based on risk associated with cost impacts to assets and the potential for undesirable events. This will allow managers to establish protection priorities in terms of the cost and the potential for the event, given the current level of protection

  2. Hierarchic Analysis Method to Evaluate Rock Burst Risk

    Directory of Open Access Journals (Sweden)

    Ming Ji

    2015-01-01

    Full Text Available In order to reasonably evaluate the risk of rock bursts in mines, the factors impacting rock bursts and the existing grading criterion on the risk of rock bursts were studied. By building a model of hierarchic analysis method, the natural factors, technology factors, and management factors that influence rock bursts were analyzed and researched, which determined the degree of each factor’s influence (i.e., weight and comprehensive index. Then the grade of rock burst risk was assessed. The results showed that the assessment level generated by the model accurately reflected the actual risk degree of rock bursts in mines. The model improved the maneuverability and practicability of existing evaluation criteria and also enhanced the accuracy and science of rock burst risk assessment.

  3. Evaluation Method of Collision Risk by Using True Motion

    Directory of Open Access Journals (Sweden)

    Hayama Imazu

    2017-03-01

    Full Text Available It is necessary to develop a useful application to use big data like as AIS for safety and efficiency of ship operation. AIS is very useful system to collect targets information, but this information is not effective use yet. The evaluation method of collision risk is one of the cause disturb. Usually the collision risk of ship is evaluated by the value of the Closest Point of Approach (CPA which is related to a relative motion. So, it becomes difficult to find out a safety pass in a congested water. Here, Line of Predicted Collision (LOPC and Obstacle Zone by Target (OZT for evaluation of collision risk are introduced, these values are related to a true motion and it became visible of dangerous place, so it will make easy to find out a safety pass in a congested water.

  4. A Method for Evaluating Competency in Assessment and Management of Suicide Risk

    Science.gov (United States)

    Hung, Erick K.; Binder, Renee L.; Fordwood, Samantha R.; Hall, Stephen E.; Cramer, Robert J.; McNiel, Dale E.

    2012-01-01

    Objective: Although health professionals increasingly are expected to be able to assess and manage patients' risk for suicide, few methods are available to evaluate this competency. This report describes development of a competency-assessment instrument for suicide risk-assessment (CAI-S), and evaluates its use in an objective structured clinical…

  5. Evaluation of risk prioritization and budget allocation methods for pollution prevention activities

    International Nuclear Information System (INIS)

    Daniels, J.; Jones, E.; Lmont, A.; Ladmn, T.; Watz, J.

    1997-01-01

    This study reviews the structure of two main risk prioritization budget allocation methods developed by the DOE Risk-Based Priority Mode (RPM) and Management Evaluation Matrix (MEM). It identifies potential augmentations to the process that will address both risk reduction and cost-effective investments of finite resources for future Environmental Management activities. The evaluation was performed in accordance with the EM ten-year vision and principles for site cleanup. The evaluation and recommendations in this report strive to reflect four key principles, namely to eliminate the most urgent risks, reduce mortgage and support costs to make funds available for further risk reduction, protect worker health and safety, and reduce the generation of wastes

  6. Proposal of a method for evaluating tsunami risk using response-surface methodology

    Science.gov (United States)

    Fukutani, Y.

    2017-12-01

    Information on probabilistic tsunami inundation hazards is needed to define and evaluate tsunami risk. Several methods for calculating these hazards have been proposed (e.g. Løvholt et al. (2012), Thio (2012), Fukutani et al. (2014), Goda et al. (2015)). However, these methods are inefficient, and their calculation cost is high, since they require multiple tsunami numerical simulations, therefore lacking versatility. In this study, we proposed a simpler method for tsunami risk evaluation using response-surface methodology. Kotani et al. (2016) proposed an evaluation method for the probabilistic distribution of tsunami wave-height using a response-surface methodology. We expanded their study and developed a probabilistic distribution of tsunami inundation depth. We set the depth (x1) and the slip (x2) of an earthquake fault as explanatory variables and tsunami inundation depth (y) as an object variable. Subsequently, tsunami risk could be evaluated by conducting a Monte Carlo simulation, assuming that the generation probability of an earthquake follows a Poisson distribution, the probability distribution of tsunami inundation depth follows the distribution derived from a response-surface, and the damage probability of a target follows a log normal distribution. We applied the proposed method to a wood building located on the coast of Tokyo Bay. We implemented a regression analysis based on the results of 25 tsunami numerical calculations and developed a response-surface, which was defined as y=ax1+bx2+c (a:0.2615, b:3.1763, c=-1.1802). We assumed proper probabilistic distribution for earthquake generation, inundation height, and vulnerability. Based on these probabilistic distributions, we conducted Monte Carlo simulations of 1,000,000 years. We clarified that the expected damage probability of the studied wood building is 22.5%, assuming that an earthquake occurs. The proposed method is therefore a useful and simple way to evaluate tsunami risk using a response

  7. Survey and evaluation of aging risk assessment methods and applications

    International Nuclear Information System (INIS)

    Sanzo, D.; Kvam, P.; Apostolakis, G.; Wu, J.; Milici, T.; Ghoniem, N.; Guarro, S.

    1994-11-01

    The US Nuclear Regulatory Commission initiated the nuclear power plant aging research program about 6 years ago to gather information about nuclear power plant aging. Since then, this program has collected a significant amount of information, largely qualitative, on plant aging and its potential effects on plant safety. However, this body of knowledge has not yet been integrated into formalisms that can be used effectively and systematically to assess plant risk resulting from aging, although models for assessing the effect of increasing failure rates on core damage frequency have been proposed. This report surveys the work on the aging of systems, structures, and components (SSCs) of nuclear power plants, as well as associated data bases. We take a critical look at the need to revise probabilistic risk assessments (PRAs) so that they will include the contribution to risk from plant aging, the adequacy of existing methods for evaluating this contribution, and the adequacy of the data that have been used in these evaluation methods. We identify a preliminary framework for integrating the aging of SSCs into the PRA and include the identification of necessary data for such an integration

  8. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  9. Toward a risk assessment of the spent fuel and high-level nuclear waste disposal system. Risk assessment requirements, literature review, methods evaluation: an interim report

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Hill, D.; Rowe, M.D.; Stern, E.

    1986-04-01

    This report provides background information for a risk assessment of the disposal system for spent nuclear fuel and high-level radioactive waste (HLW). It contains a literature review, a survey of the statutory requirements for risk assessment, and a preliminary evaluation of methods. The literature review outlines the state of knowledge of risk assessment and accident consequence analysis in the nuclear fuel cycle and its applicability to spent fuel and HLW disposal. The survey of statutory requirements determines the extent to which risk assessment may be needed in development of the waste-disposal system. The evaluation of methods reviews and evaluates merits and applicabilities of alternative methods for assessing risks and relates them to the problems of spent fuel and HLW disposal. 99 refs.

  10. Toward a risk assessment of the spent fuel and high-level nuclear waste disposal system. Risk assessment requirements, literature review, methods evaluation: an interim report

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Hill, D.; Rowe, M.D.; Stern, E.

    1986-04-01

    This report provides background information for a risk assessment of the disposal system for spent nuclear fuel and high-level radioactive waste (HLW). It contains a literature review, a survey of the statutory requirements for risk assessment, and a preliminary evaluation of methods. The literature review outlines the state of knowledge of risk assessment and accident consequence analysis in the nuclear fuel cycle and its applicability to spent fuel and HLW disposal. The survey of statutory requirements determines the extent to which risk assessment may be needed in development of the waste-disposal system. The evaluation of methods reviews and evaluates merits and applicabilities of alternative methods for assessing risks and relates them to the problems of spent fuel and HLW disposal. 99 refs

  11. Evaluation of a chemical risk assessment method of South Korea for chemicals classified as carcinogenic, mutagenic or reprotoxic (CMR).

    Science.gov (United States)

    Kim, Min-Uk; Byeon, Sang-Hoon

    2017-12-12

    Chemicals were used in various fields by the development of industry and science and technology. The Chemical Hazard Risk Management (CHARM) was developed to assess the risk of chemicals in South Korea. In this study, we were to evaluate the CHARM model developed for the effective management of workplace chemicals. We used 59 carcinogenic, mutagenic or reprotoxic (CMR) materials, which are both the work environment measurement result and the usage information among the manufacturer data. The CHARM model determines the risk to human health using the exposure level (based on working environment measurements or a combination of the quantity used and chemical physical properties (e.g., fugacity and volatility)), hazard (using occupational exposure limit (OEL) or Risk phrases (R-phrases)/Hazard statements (H-statements) from the Material Safety Data Sheet (MSDS)). The risk level was lower when using the results of the work environment measurement than when applying the chemical quantity and physical properties in the exposure level evaluation method. It was evaluated as grade 4 for the CMR material in the hazard class determination. The risk assessment method by R-phrases was evaluated more conservatively than the risk assessment method by OEL. And the risk assessment method by H-statements was evaluated more conservatively than the risk assessment method by R-phrases. The CHARM model was gradually conservatively assessed as it proceeded in the next step without quantitative information for individual workplaces. The CHARM is expected to help identify the risk if the hazards and exposure levels of chemicals were identified in individual workplaces. For CMR substances, although CHARM is highly evaluated for hazards, the risk is assessed to be low if exposure levels are assessed low. When evaluating the risk of highly hazardous chemicals such as CMR substances, we believe the model should be adapted to be more conservative and classify these as higher risk. This work is

  12. Methods of risk assessment

    International Nuclear Information System (INIS)

    Jones, D.R.

    1981-01-01

    The subject is discussed under the headings: introduction (identification, quantification of risk); some approaches to risk evaluation (use of the 'no risk' principle; the 'acceptable risk' method; risk balancing; comparison of risks, benefits and other costs); cost benefit analysis; an alternative approach (tabulation and display; description and reduction of the data table); identification of potential decision sets consistent with the constraints. Some references are made to nuclear power. (U.K.)

  13. Fuzzy Risk Evaluation in Failure Mode and Effects Analysis Using a D Numbers Based Multi-Sensor Information Fusion Method.

    Science.gov (United States)

    Deng, Xinyang; Jiang, Wen

    2017-09-12

    Failure mode and effect analysis (FMEA) is a useful tool to define, identify, and eliminate potential failures or errors so as to improve the reliability of systems, designs, and products. Risk evaluation is an important issue in FMEA to determine the risk priorities of failure modes. There are some shortcomings in the traditional risk priority number (RPN) approach for risk evaluation in FMEA, and fuzzy risk evaluation has become an important research direction that attracts increasing attention. In this paper, the fuzzy risk evaluation in FMEA is studied from a perspective of multi-sensor information fusion. By considering the non-exclusiveness between the evaluations of fuzzy linguistic variables to failure modes, a novel model called D numbers is used to model the non-exclusive fuzzy evaluations. A D numbers based multi-sensor information fusion method is proposed to establish a new model for fuzzy risk evaluation in FMEA. An illustrative example is provided and examined using the proposed model and other existing method to show the effectiveness of the proposed model.

  14. Dependent failure analysis research for the US NRC Risk Methods Integration and Evaluation Program

    International Nuclear Information System (INIS)

    Bohn, M.P.; Stack, D.W.; Campbell, D.J.; Rooney, J.J.; Rasmuson, D.M.

    1985-01-01

    The Risk Methods Integration and Evaluation Program (RMIEP), which is being performed for the Nuclear Regulatory Commission by Sandia National Laboratories, has the goals of developing new risk assessment methods and integrating the new and existing methods in a uniform procedure for performing an in-depth probabilistic risk assessment (PRA) with consistent levels of analysis for internal, external, and dependent failure scenarios. An important part of RMIEP is the recognition of the crucial importance of dependent common cause failures (CCFs) and the pressing need to develop effective methods for analyzing CCFs as part of a PRA. The NRC-sponsored Integrated Dependent Failure Methodology Program at Sandia is addressing this need. This paper presents a preliminary approach for analyzing CCFs as part of a PRA. A nine-step procedure for efficiently screening and analyzing dependent failure scenarios is presented, and each step is discussed

  15. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  16. Risk estimation and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson, R A.D.

    1982-10-01

    Risk assessment involves subjectivity, which makes objective decision making difficult in the nuclear power debate. The author reviews the process and uncertainties of estimating risks as well as the potential for misinterpretation and misuse. Risk data from a variety of aspects cannot be summed because the significance of different risks is not comparable. A method for including political, social, moral, psychological, and economic factors, environmental impacts, catastrophes, and benefits in the evaluation process could involve a broad base of lay and technical consultants, who would explain and argue their evaluation positions. 15 references. (DCK)

  17. Practical Methods for Information Security Risk Management

    Directory of Open Access Journals (Sweden)

    Cristian AMANCEI

    2011-01-01

    Full Text Available The purpose of this paper is to present some directions to perform the risk man-agement for information security. The article follows to practical methods through question-naire that asses the internal control, and through evaluation based on existing controls as part of vulnerability assessment. The methods presented contains all the key elements that concurs in risk management, through the elements proposed for evaluation questionnaire, list of threats, resource classification and evaluation, correlation between risks and controls and residual risk computation.

  18. Uncertainty Analysis and Overtopping Risk Evaluation of Maroon Dam withMonte Carlo and Latin Hypercube Methods

    Directory of Open Access Journals (Sweden)

    J. M. Vali Samani

    2016-02-01

    Full Text Available Introduction: The greatest part of constructed dams belongs to embankment dams and there are many examples of their failures throughout history. About one-third of the world’s dam failures have been caused by flood overtopping, which indicates that flood overtopping is an important factor affecting reservoir projects’ safety. Moreover, because of a poor understanding of the randomness of floods, reservoir water levels during flood seasons are often lowered artificially in order to avoid overtopping and protect the lives and property of downstream residents. So, estimation of dam overtopping risk with regard to uncertainties is more important than achieving the dam’s safety. This study presents the procedure for risk evaluation of dam overtopping due to various uncertaintiess in inflows and reservoir initial condition. Materials and Methods: This study aims to present a practical approach and compare the different uncertainty analysis methods in the evaluation of dam overtopping risk due to flood. For this purpose, Monte Carlo simulation and Latin hypercube sampling methods were used to calculate the overtopping risk, evaluate the uncertainty, and calculate the highest water level during different flood events. To assess these methods from a practical point of view, the Maroon dam was chosen for the case study. Figure. 1 indicates the work procedure, including three parts: 1 Identification and evaluation of effective factors on flood routing and dam overtopping, 2 Data collection and analysis for reservoir routing and uncertainty analysis, 3 Uncertainty and risk analysis. Figure 1- Diagram of dam overtopping risk evaluation Results and Discussion: Figure 2 shows the results of the computed overtopping risks for the Maroon Dam without considering the wind effect, for the initial water level of 504 m as an example. As it is shown in Figure. 2, the trends of the risk curves computed by the different uncertainty analysis methods are similar

  19. Efficient improvement of nuclear power plant safety by reorganization of risk-informed safety importance evaluation methods for piping welded portions

    Energy Technology Data Exchange (ETDEWEB)

    Irie, Takashi; Hanafusa, Hidemitsu; Suyama, Takeshi [Institute of Nuclear Safety System, Inc., Mihama, Fukui (Japan); Morota, Hidetsugu; Kojima, Sigeo; Mizuno, Yoshinobu [Computer Software Development Co., Ltd., Tokyo (Japan)

    2002-09-01

    In this work, risk information was used to evaluate the safety importance of piping welded portions which were important for plant operation and maintenance of nuclear power plants. There are two types of risk-informed safety importance evaluation methods, namely the ASME method and the EPRI method. Since both methods have advantages and disadvantages, elements of each method were combined and reorganized. Considerations included whether the degradation mechanisms would be objectively evaluated and whether plant safety would be efficiently improved. The most objective and efficient method was as follows. Piping failure potential is quantitatively and objectively evaluated for failure with probabilistic fracture mechanics (PFM) and for other degradation mechanisms with empirical failure rates, and conditional core damage probability (CCDP) is calculated with PSA. This method reduces the inspected segment numbers to 1/4 of the deterministic method and increases the ratio of risk, which is covered by the inspected segments, to total risk from 80% of the deterministic method to 95%. Piping inspection numbers decreased for safety injection systems that were required the inspections by the deterministic method. Piping inspections were required for part of main feed water and main steam systems that were not required the inspections by the deterministic method. (author)

  20. Methods development to evaluate the risk of upgrading to DCS: The human factor

    Energy Technology Data Exchange (ETDEWEB)

    Ostrom, L.T.; Wilhelmsen, C.A. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1995-04-01

    The NRC recognizes that a more complete technical basis for understanding and regulating advanced digital technologies in commercial nuclear power plants is needed. A concern is that the introduction of digital safety systems may have an impact on risk. There is currently no standard methodology for measuring digital system reliability. A tool currently used to evaluate NPP risk in analog systems is the probabilistic risk assessment (PRA). The use of this tool to evaluate the digital system risk was considered to be a potential methodology for determining the risk. To test this hypothesis, it was decided to perform a limited PRA on a single dominant accident sequence. However, a review of existing human reliability analysis (HRA) methods showed that they were inadequate to analyze systems utilizing digital technology. A four step process was used to adapt existing HRA methodologies to digital environments and to develop new techniques. The HRA methods were then used to analyze an NPP that had undergone a backfit to digital technology in order to determine, as a first step, whether the methods were effective. The very small-break loss of coolant accident sequence was analyzed to determine whether the upgrade to the Eagle-21 process protection system had an effect on risk. The analysis of the very small-break LOCA documented in the Sequoyah PRA was used as the basis of the analysis. The analysis of the results of the HRA showed that the mean human error probabilities for the Eagle-21 PPS were slightly less than those for the analog system it replaced. One important observation from the analysis is that the operators have increased confidence steming from the better level of control provided by the digital system. The analysis of the PRA results, which included the human error component and the Eagle-21 PPS, disclosed that the reactor protection system had a higher failure rate than the analog system, although the difference was not statistically significant.

  1. Safety evaluations by means of the method use of the risk matrix in radiotherapy treatments

    International Nuclear Information System (INIS)

    Sanchez, L.; Diaz, A.; Correa, T.; Gonzalez, Y.

    2014-08-01

    The quality of a radiotherapy treatment is linked to multidisciplinary factors that need to be taken into account in combined form whenever an evaluation of the safety is carried out. Knowing the accidents happened in this area, and to guarantee their prevention, the causes and sequences that could behave to them should be controlled, for what is necessary to make periodic evaluations of the same one. Our objective was to carry out the safety evaluation to the treatment process of a radiotherapy service and to identify the causes and consequences that can cause these accidental exposures, for patients, worker or people, from the equipment installation until the treatment completion. The method of Risk Matrices was used, by means the SEVRRA system carried out by the Comision Nacional de Seguridad Nuclear y Salvaguardias of Mexico; this system allows to carry out a combined analysis of the occurrence frequency of the event initiator, the probability of human errors or barrier failures and the graveness of the consequences, facilitating the identification of the associated risk to the radiotherapy procedures. The method establishes priorities for the risk administration and identifies the main causes that could cause accidental exposures; also allows preventing the accidents occurrence using risk criterions that take into account the probability and magnitude of the potential exposures. This method, although does not allow to quantify numerically the risk, makes possible to classify it in levels, what is enough to establish priorities, without carrying out risks analysis but precise but more expensive. As a result we obtained that for the Co 60 77% of the treatments, is realized with low or half risk and 23% with high risk; the work load that is elevated in our case, intervenes directly in 46 initiators, in second and third place, the non realization of a portal image in the first treatment section and in the weekly continuation, as a consequences reducer, but these

  2. Issues in Value-at-Risk Modeling and Evaluation

    NARCIS (Netherlands)

    J. Daníelsson (Jón); C.G. de Vries (Casper); B.N. Jorgensen (Bjørn); P.F. Christoffersen (Peter); F.X. Diebold (Francis); T. Schuermann (Til); J.A. Lopez (Jose); B. Hirtle (Beverly)

    1998-01-01

    textabstractDiscusses the issues in value-at-risk modeling and evaluation. Value of value at risk; Horizon problems and extreme events in financial risk management; Methods of evaluating value-at-risk estimates.

  3. STOCHASTIC METHODS IN RISK ANALYSIS

    Directory of Open Access Journals (Sweden)

    Vladimíra OSADSKÁ

    2017-06-01

    Full Text Available In this paper, we review basic stochastic methods which can be used to extend state-of-the-art deterministic analytical methods for risk analysis. We can conclude that the standard deterministic analytical methods highly depend on the practical experience and knowledge of the evaluator and therefore, the stochastic methods should be introduced. The new risk analysis methods should consider the uncertainties in input values. We present how large is the impact on the results of the analysis solving practical example of FMECA with uncertainties modelled using Monte Carlo sampling.

  4. An evaluation of risk methods for prioritizing fire protection features: a procedure for fire barrier penetration seals

    International Nuclear Information System (INIS)

    Dey, M.K.

    2004-01-01

    This paper generally evaluates risk methods available for prioritizing fire protection features. Risk methods involving both the use of qualitative insights, and quantitative results from a fire probabilistic risk analysis are reviewed. The applicability of these methods to develop a prioritized list of fire barrier penetration seals in a plant based on risk significance is presented as a procedure to illustrate the benefits of the methods. The paper concludes that current fire risk assessment methods can be confidently used to prioritize plant fire protection features, specifically fire barrier penetration seals. Simple prioritization schemes, using qualitative assessments and insights from fire PRA methodology may be implemented without the need for quantitative results. More elaborate prioritization schemes that allow further refinements to the categorization process may be implemented using the quantitative results of the screening processes in good fire PRAs. The use of the quantitative results from good fire PRAs provide several benefits for risk prioritization of fire protection features at plants, mainly from the plant systems analyses conducted for a fire PRA

  5. Risk-based Regulatory Evaluation Program methodology

    International Nuclear Information System (INIS)

    DuCharme, A.R.; Sanders, G.A.; Carlson, D.D.; Asselin, S.V.

    1987-01-01

    The objectives of this DOE-supported Regulatory Evaluation Progrwam are to analyze and evaluate the safety importance and economic significance of existing regulatory guidance in order to assist in the improvement of the regulatory process for current generation and future design reactors. A risk-based cost-benefit methodology was developed to evaluate the safety benefit and cost of specific regulations or Standard Review Plan sections. Risk-based methods can be used in lieu of or in combination with deterministic methods in developing regulatory requirements and reaching regulatory decisions

  6. A new cyber security risk evaluation method for oil and gas SCADA based on factor state space

    International Nuclear Information System (INIS)

    Yang, Li; Cao, Xiedong; Li, Jie

    2016-01-01

    Based on comprehensive analysis of the structure and the potential safety problem of oil and gas SCADA(Supervisor control and data acquisition) network, aiming at the shortcomings of traditional evaluation methods, combining factor state space and fuzzy comprehensive evaluation method, a new network security risk evaluation method of oil and gas SCADA is proposed. First of all, formal description of factor state space and its complete mathematical definition were presented; secondly, factor fuzzy evaluation steps were discussed; then, using analytic hierarchy method, evaluation index system for oil and gas SCADA system was established, the index weights of all factors were determined by two-two comparisons; structure design of three layers in reasoning machine was completed. Experiments and tests show that the proposed method is accurate, reliable and practical. Research results provide the template and the new method for the other industries.

  7. Risk effectiveness evaluation of surveillance testing

    International Nuclear Information System (INIS)

    Kim, I.S.; Samanta, P.K.; Martorell, S.; Vesely, W.E.

    1991-01-01

    To address the concerns about nuclear power plant surveillance tests, i.e., their adverse safety impact due to negative effects and too burdensome requirements, it is necessary to evaluate the safety significance or risk effectiveness of such tests explicitly considering both negative and positive effects. This paper defines the negative effects of surveillance testing from a risk perspective, and then presents a methodology to quantify the negative risk impact, i.e., the risk penalty or risk increase caused by the test. The method focuses on two important kinds of negative effects, namely, test-caused transients and test-caused equipment degradations. The concepts and quantitative methods for the risk evaluation can be used in the decision-making process to establish the safety significance of the tests and to screen the plant-specific surveillance test requirements. 6 refs., 2 figs., 2 tabs

  8. HOW INTERNAL RISK - BASED AUDIT APPRAISES THE EVALUATION OF RISKS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    N. Dorosh

    2017-09-01

    Full Text Available The article deals with the nature and function of the internal risk-based audit process approach to create patterns of risks and methods of evaluation. Deals with the relationship between the level of maturity of the risk of the company and the method of risk-based internal audit. it was emphasized that internal auditing provides an independent and objective opinion to an organization’s management as to whether its risks are being managed to acceptable levels.

  9. Evaluating high risks in large-scale projects using an extended VIKOR method under a fuzzy environment

    Directory of Open Access Journals (Sweden)

    S. Ebrahimnejad

    2012-04-01

    Full Text Available The complexity of large-scale projects has led to numerous risks in their life cycle. This paper presents a new risk evaluation approach in order to rank the high risks in large-scale projects and improve the performance of these projects. It is based on the fuzzy set theory that is an effective tool to handle uncertainty. It is also based on an extended VIKOR method that is one of the well-known multiple criteria decision-making (MCDM methods. The proposed decision-making approach integrates knowledge and experience acquired from professional experts, since they perform the risk identification and also the subjective judgments of the performance rating for high risks in terms of conflicting criteria, including probability, impact, quickness of reaction toward risk, event measure quantity and event capability criteria. The most notable difference of the proposed VIKOR method with its traditional version is just the use of fuzzy decision-matrix data to calculate the ranking index without the need to ask the experts. Finally, the proposed approach is illustrated with a real-case study in an Iranian power plant project, and the associated results are compared with two well-known decision-making methods under a fuzzy environment.

  10. Credit Risk Evaluation of Power Market Players with Random Forest

    Science.gov (United States)

    Umezawa, Yasushi; Mori, Hiroyuki

    A new method is proposed for credit risk evaluation in a power market. The credit risk evaluation is to measure the bankruptcy risk of the company. The power system liberalization results in new environment that puts emphasis on the profit maximization and the risk minimization. There is a high probability that the electricity transaction causes a risk between companies. So, power market players are concerned with the risk minimization. As a management strategy, a risk index is requested to evaluate the worth of the business partner. This paper proposes a new method for evaluating the credit risk with Random Forest (RF) that makes ensemble learning for the decision tree. RF is one of efficient data mining technique in clustering data and extracting relationship between input and output data. In addition, the method of generating pseudo-measurements is proposed to improve the performance of RF. The proposed method is successfully applied to real financial data of energy utilities in the power market. A comparison is made between the proposed and the conventional methods.

  11. Risk uncertainty analysis methods for NUREG-1150

    International Nuclear Information System (INIS)

    Benjamin, A.S.; Boyd, G.J.

    1987-01-01

    Evaluation and display of risk uncertainties for NUREG-1150 constitute a principal focus of the Severe Accident Risk Rebaselining/Risk Reduction Program (SARRP). Some of the principal objectives of the uncertainty evaluation are: (1) to provide a quantitative estimate that reflects, for those areas considered, a credible and realistic range of uncertainty in risk; (2) to rank the various sources of uncertainty with respect to their importance for various measures of risk; and (3) to characterize the state of understanding of each aspect of the risk assessment for which major uncertainties exist. This paper describes the methods developed to fulfill these objectives

  12. Control of Risks Through the Use of Procedures: A Method for Evaluating the Change in Risk

    Science.gov (United States)

    Praino, Gregory T.; Sharit, Joseph

    2010-01-01

    not. The model used for describing the Failure Likelihood considers how well a task was established by evaluating that task on five components. The components selected to define a well established task are: that it be defined, assigned to someone capable, that they be trained appropriately, that the actions be organized to enable proper completion and that some form of independent monitoring be performed. Validation of the method was based on the information provided by a group of experts in Space Shuttle ground processing when they were presented with 5 scenarios that identified a clause from a procedure. For each scenario, they recorded their perception of how important the associated rule was and how likely it was to fail. They then rated the components of Control Value and Failure Likelihood for all the scenarios. The order in which each reviewer ranked the scenarios Control Value and Failure Likelihood was compared to the order in which they ranked the scenarios for each of the associated components; inevitability and opportunity for Control Value and definition, assignment, training, organization and monitoring for Failure Likelihood. This order comparison showed how the components contributed to a relative relationship to the substitute risk element. With the relationship established for Space Shuttle ground processing, this method can be used to gauge if the introduction or removal of a particular rule will increase or decrease the .risk associated with the hazard it is intended to control.

  13. Risk evaluation method for faults by engineering approach. (1) Nuclear safety for accident scenario and measures for fault movement

    International Nuclear Information System (INIS)

    Narabayashi, Tadashi; Chiba, Go; Okamoto, Koji; Kameda, Hiroyuki; Ebisawa, Katsumi; Yamazaki, Haruo; Konagai, Kazuo; Kamiya, Masanobu; Nagasawa, Kazuyuki

    2016-01-01

    Japan, as a frequent earthquake country, has a responsibility to resolve efficient measures to enhance nuclear safety, to continue utilizing the nuclear power, based on the risks and importance levels in the scientific and rational manner. In his paper describes how to evaluate the risk of faults movement by engineering approach. An open fruitful discussion by experts in the various area of earthquake, geology, geotechnical, civil, and a seismic design as well as other stakeholders such as academia professors, nuclear reactor engineers, regulators, and licensees. The Atomic Energy Society established an Investigation Committee on Development of Activity and Risk Evaluation Method for Faults by Engineering Approach (IC-DAREFEA) on October 1st, a 2014. The Investigation Committee utilizes the most advanced scientific and rational judgement, and continuous discussions and efforts in the global field, in order to collect and organize these knowledge and reflect the global standards and nuclear regulations, such as risk evaluation method for the faults movements and prevention of severe accidents, based on the accumulated database in the world, including Chuetsuoki Earthquake, North Nagano Earthquake and Kumamoto Earthquake. (author)

  14. A risk evaluation model and its application in online retailing trustfulness

    Science.gov (United States)

    Ye, Ruyi; Xu, Yingcheng

    2017-08-01

    Building a general model for risks evaluation in advance could improve the convenience, normality and comparability of the results of repeating risks evaluation in the case that the repeating risks evaluating are in the same area and for a similar purpose. One of the most convenient and common risks evaluation models is an index system including of several index, according weights and crediting method. One method to build a risk evaluation index system that guarantees the proportional relationship between the resulting credit and the expected risk loss is proposed and an application example is provided in online retailing in this article.

  15. RISK EVALUATION OF PIN JIG WORK UNIT IN SHIPBUILDING BY USING FUZZY AHP METHOD

    Directory of Open Access Journals (Sweden)

    Murat Ozkok

    2015-03-01

    Full Text Available Shipbuilding industry includes many different industry branches in itself so various kind of work accidents occur. These work accidents often cause serious injuries and also deaths. It is a crucial thing to prevent or minimize these accidents. In order to reduce work accidents in shipyards, the most hazardous activities are needed to be determined and then, shipyard management must work on it in order to remove these hazard sources. In this study, pin jig work unit, where the curved parts are mounted on adjustable pin jigs, was considered. At first, the work activities and operations of pin jig work station were identified and they were classified as main and sub risk criterions. Then, pair comparison scales were built and these risk criterions were evaluated by experts who have been working for a shipyard located in Turkey. As a result of the evaluations of the experts, the risk weights of the activities carried out at pin jig work unit were defined by using fuzzy AHP method. Therefore, it is aimed for the shipyard management to take some precautions at pinjig work unit on the risky operations before failures happen.

  16. The determination of allowed outage time using the evaluation of transition risk

    International Nuclear Information System (INIS)

    Kang, D. I.; Kim, K. Y.; Jang, S. C.

    2001-03-01

    he objectives of this study are to propose a new evaluation method for transition risk and to determine the AOT using the new method. We review and compare the evaluation methods of transition risk which was previously studied. We also identify important assumptions used in previous studies for the evaluation of transition risk. We select general items required for the development of evaluation method for the transition risk. Based on the items selected, we propose a new evaluation method for transition risk. The new evaluation method for the transition risk is based on following assumptions; 1)For the same time span, the risk occurred from the failure to the completion of component repair during power operation is the same as the total risk including the risk occurred from power operation to specific shutdown/low power operation and the risk from specific shutdown/low power operation to power operation. 2)Shutdown operation and the repair of components are initiated just after the identification of the failure of components. The evaluation of the transition risk is performed to incorporate the characteristics of shutdown operation into Ulchin Units 3 and 4 Level 1 internal PSA for power operation. The application results of the new method to the HPSIS and the LPSIS for Ulchin Units 3 and 4 show that the AOT of HPSIS is properly determined and the AOT of LPSIS can be greatly increased. In this study, the main factors affecting the determination of AOT using the evaluation for transition risk are identified as the time of shutdown operation, the consideration of the change on common cause failure probability, and the risk of shutdown operation. It is expected that the evaluation method for the transition risk proposed in this study will be used for the determination of AOT and for the decision, in the case of the components unavailable, whether power operation is continuously performed or shutdown operation is initiated

  17. An improved method for risk evaluation in failure modes and effects analysis of CNC lathe

    Science.gov (United States)

    Rachieru, N.; Belu, N.; Anghel, D. C.

    2015-11-01

    Failure mode and effects analysis (FMEA) is one of the most popular reliability analysis tools for identifying, assessing and eliminating potential failure modes in a wide range of industries. In general, failure modes in FMEA are evaluated and ranked through the risk priority number (RPN), which is obtained by the multiplication of crisp values of the risk factors, such as the occurrence (O), severity (S), and detection (D) of each failure mode. However, the crisp RPN method has been criticized to have several deficiencies. In this paper, linguistic variables, expressed in Gaussian, trapezoidal or triangular fuzzy numbers, are used to assess the ratings and weights for the risk factors S, O and D. A new risk assessment system based on the fuzzy set theory and fuzzy rule base theory is to be applied to assess and rank risks associated to failure modes that could appear in the functioning of Turn 55 Lathe CNC. Two case studies have been shown to demonstrate the methodology thus developed. It is illustrated a parallel between the results obtained by the traditional method and fuzzy logic for determining the RPNs. The results show that the proposed approach can reduce duplicated RPN numbers and get a more accurate, reasonable risk assessment. As a result, the stability of product and process can be assured.

  18. Simple probabilistic method for relative risk evaluation of nuclear terrorism events

    International Nuclear Information System (INIS)

    Zhang Songbai; Wu Jun

    2006-01-01

    On the basis of the event-tree and probability analysis methods, a probabilistic method of nuclear terrorism risk was built, and the risk of terrorism events was analyzed. With the statistical data for and hypothetical data for relative events, the relative probabilities of the four kinds of nuclear terrorism events were obtained, as well as the relative risks of these four kinds of nuclear terrorism events were calculated by using this probabilistic method. The illustrated case show that the descending sequence of damages from the four kinds of nuclear terrorism events for single event is as following: nuclear explosive and improvised nuclear explosive, nuclear facility attacked, and 'dirty bomb'. Under the hypothetical condition, the descending sequence of possibilities for the four kinds of nuclear terrorism events is as following: 'dirty bomb', nuclear facility attacked, improvised nuclear explosive and nuclear explosive, but the descending sequence of risks is as following: 'dirty bomb', improvised nuclear explosive, nuclear facility attacked, and nuclear explosive . (authors)

  19. Developing an objective evaluation method to estimate diabetes risk in community-based settings.

    Science.gov (United States)

    Kenya, Sonjia; He, Qing; Fullilove, Robert; Kotler, Donald P

    2011-05-01

    Exercise interventions often aim to affect abdominal obesity and glucose tolerance, two significant risk factors for type 2 diabetes. Because of limited financial and clinical resources in community and university-based environments, intervention effects are often measured with interviews or questionnaires and correlated with weight loss or body fat indicated by body bioimpedence analysis (BIA). However, self-reported assessments are subject to high levels of bias and low levels of reliability. Because obesity and body fat are correlated with diabetes at different levels in various ethnic groups, data reflecting changes in weight or fat do not necessarily indicate changes in diabetes risk. To determine how exercise interventions affect diabetes risk in community and university-based settings, improved evaluation methods are warranted. We compared a noninvasive, objective measurement technique--regional BIA--with whole-body BIA for its ability to assess abdominal obesity and predict glucose tolerance in 39 women. To determine regional BIA's utility in predicting glucose, we tested the association between the regional BIA method and blood glucose levels. Regional BIA estimates of abdominal fat area were significantly correlated (r = 0.554, P < 0.003) with fasting glucose. When waist circumference and family history of diabetes were added to abdominal fat in multiple regression models, the association with glucose increased further (r = 0.701, P < 0.001). Regional BIA estimates of abdominal fat may predict fasting glucose better than whole-body BIA as well as provide an objective assessment of changes in diabetes risk achieved through physical activity interventions in community settings.

  20. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  1. The Comprehensive Evaluation Method of Supervision Risk in Electricity Transaction Based on Unascertained Rational Number

    Science.gov (United States)

    Haining, Wang; Lei, Wang; Qian, Zhang; Zongqiang, Zheng; Hongyu, Zhou; Chuncheng, Gao

    2018-03-01

    For the uncertain problems in the comprehensive evaluation of supervision risk in electricity transaction, this paper uses the unidentified rational numbers to evaluation the supervision risk, to obtain the possible result and corresponding credibility of evaluation and realize the quantification of risk indexes. The model can draw the risk degree of various indexes, which makes it easier for the electricity transaction supervisors to identify the transaction risk and determine the risk level, assisting the decision-making and realizing the effective supervision of the risk. The results of the case analysis verify the effectiveness of the model.

  2. Centrality as a Method for the Evaluation of Semantic Resources for Disaster Risk Reduction

    Directory of Open Access Journals (Sweden)

    Otakar Čerba

    2017-08-01

    Full Text Available Clear and straightforward communication is a key aspect of all human activities related to crisis management. Since crisis management activities involve professionals from various disciplines using different terminology, clear and straightforward communication is difficult to achieve. Semantics as a broad science can help to overcome communication difficulties. This research focuses on the evaluation of available semantic resources including ontologies, thesauri, and controlled vocabularies for disaster risk reduction as part of crisis management. The main idea of the study is that the most appropriate source of broadly understandable terminology is such a semantic resource, which is accepted by—or at least connected to the majority of other resources. Important is not only the number of interconnected resources, but also the concrete position of the resource in the complex network of Linked Data resources. Although this is usually done by user experience, objective methods of resource semantic centrality can be applied. This can be described by centrality methods used mainly in graph theory. This article describes the calculation of four types of centrality methods (Outdegree, Indegree, Closeness, and Betweenness applied to 160 geographic concepts published as Linked Data and related to disaster risk reduction. Centralities were calculated for graph structures containing particular semantic resources as nodes and identity links as edges. The results show that (with some discussed exceptions the datasets with high values of centrality serve as important information resources, but they also include more concepts from preselected 160 geographic concepts. Therefore, they could be considered as the most suitable resources of terminology to make communication in the domain easier. The main research goal is to automate the semantic resources evaluation and to apply a well-known theoretical method (centrality to the semantic issues of Linked Data. It

  3. Risk Analysis Method Based on FMEA for Transmission Line in Lightning Hazards

    Directory of Open Access Journals (Sweden)

    You-Yuan WANG

    2014-05-01

    Full Text Available Failure rate of transmission line and reliability of power system are significantly affected by Lightning meteorological factor. In view of the complexity and variability of Lightning meteorological factors, this paper presents lightning trip-out rate model of transmission line in considering distribution of ground flash density and lightning day hours. Meanwhile, presents a failure rate model of transmission line in different condition, and a risk analysis method for transmission line considering multiple risk factors based on risk quantification. This method takes Lightning meteorological factor as the main evaluation standard, and establishes risk degree evaluation system for transmission line including another five evaluation standard. Put forward the risk indicators by quantify the risk factors based on experience date of transmission line in service. Based on the risk indexes comprehensive evaluation is conducted, and the evaluation result closer to practice is achieved, providing basis for transmission line risk warning and maintenance strategy. Through the risk analysis for 220 kV transmission line in a certain power supply bureau, the effectiveness of the proposed method is validated.

  4. Comprehensive safeguards evaluation methods and societal risk analysis

    International Nuclear Information System (INIS)

    Richardson, J.M.

    1982-03-01

    Essential capabilities of an integrated evaluation methodology for analyzing safeguards systems are discussed. Such a methodology must be conceptually meaningful, technically defensible, discriminating and consistent. A decompostion of safeguards systems by function is mentioned as a possible starting point for methodology development. The application of a societal risk equation to safeguards systems analysis is addressed. Conceptual problems with this approach are discussed. Technical difficulties in applying this equation to safeguards systems are illustrated through the use of confidence intervals, information content, hypothesis testing and ranking and selection procedures

  5. DEVELOPMENT OF A RISK SCREENING METHOD FOR CREDITED OPERATOR ACTIONS

    International Nuclear Information System (INIS)

    HIGGINS, J.C.; O'HARA, J.M.; LEWIS, P.M.; PERSENSKY, J.; BONGARRA, J.

    2002-01-01

    DEVELOPMENT OF A RISK SCREENING METHOD FOR CREDITED OPERATOR ACTIONS. THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) REVIEWS THE HUMAN FACTORS ASPECTS OF PROPOSED LICENSE AMENDMENTS THAT IMPACT HUMAN ACTIONS THAT ARE CREDITED IN A PLANTS SAFETY ANALYSIS. THE STAFF IS COMMITTED TO A GRADED APPROACH TO THESE REVIEWS THAT FOCUS RESOURCES ON THE MOST RISK IMPORTANT CHANGES. THEREFORE, A RISK INFORMED SCREENING METHOD WAS DEVELOPED BASED ON AN ADAPTATION OF EXISTING GUIDANCE FOR RISK INFORMED REGULATION AND HUMAN FACTORS. THE METHOD USES BOTH QUANTITATIVE AND QUALITATIVE INFORMATION TO DIVIDE THE AMENDMENT REQUESTS INTO DIFFERENT LEVELS OF REVIEW. THE METHOD WAS EVALUATED USING A VARIETY OF TESTS. THIS PAPER WILL SUMMARIZE THE DEVELOPMENT OF THE METHODOLOGY AND THE EVALUATIONS THAT WERE PERFORMED TO VERIFY ITS USEFULNESS

  6. Risk evaluation of medical and industrial radiation devices

    International Nuclear Information System (INIS)

    Jones, E.D.; Cunningham, R.E.; Rathbun, P.A.

    1994-03-01

    In 1991, the NRC, Division of Industrial and Medical Nuclear Safety, began a program to evaluate the use of probabilistic risk assessment (PRA) in regulating medical devices. This program represents an initial step in an overall plant to evaluate the use of PRA in regulating the use of nuclear by-product materials. The NRC envisioned that the use of risk analysis techniques could assist staff in ensuring that the regulatory approach was standardized, understandable, and effective. Traditional methods of assessing risk in nuclear power plants may be inappropriate to use in assessing the use of by-product devices. The approaches used in assessing nuclear reactor risks are equipment-oriented. Secondary attention is paid to the human component, for the most part after critical system failure events have been identified. This paper describes the risk methodology developed by Lawrence Livermore National Laboratory (LLNL), initially intended to assess risks associated with the use of the Gamma Knife, a gamma stereotactic radiosurgical device. For relatively new medical devices such as the Gamma Knife, the challenge is to perform a risk analysis with very little quantitative data but with an important human factor component. The method described below provides a basic approach for identifying the most likely risk contributors and evaluating their relative importance. The risk analysis approach developed for the Gamma Knife and described in this paper should be applicable to a broader class of devices in which the human interaction with the device is a prominent factor. In this sense, the method could be a prototypical model of nuclear medical or industrial device risk analysis

  7. A study of risk evaluation methodology selection for the external hazards

    International Nuclear Information System (INIS)

    Kuramoto, Takahiro; Yamaguchi, Akira; Narumiya, Yosiyuki

    2014-01-01

    Since the accident at Fukushima Daiichi Nuclear Power Plant caused by the Great East Japan Earthquake in March 2011, there has been growing demands for assessing the effects of external hazards, including natural events, such as earthquake and tsunami, and external human behaviors, and taking actions to address those external hazards. The newly established Japanese regulatory requirements claim design considerations associated with external hazards. The primary objective of the risk assessment for external hazards is to establish countermeasures against such hazards rather than grasping the risk figures. Therefore, applying detailed risk assessment methods, such as probabilistic risk assessment (PRA), to all the external hazards is not always the most appropriate. Risk assessment methods can vary in types including qualitative evaluation, hazard analysis (analyzing hazard frequencies or their influence), and margin assessment. To resolve these issues, a process has been established that enables us to identify the external hazards in a comprehensive and systematic manner, which have potential risks leading to core damage and to select an appropriate evaluation method according to the risks associated with each of the external hazards. This paper discusses the comprehensive and systematic identification process for the external hazards which have potential risks leading to core damage, and the approaches of selecting an appropriate evaluation method for each external hazard. This paper also describes some applications of specific risk evaluation methods. (author)

  8. The Application of DEA Method in Evaluating Credit Risk of Companies

    Directory of Open Access Journals (Sweden)

    Anna Feruś

    2010-12-01

    Full Text Available The subject of the present article is a new procedure forecasting credit risk of companies in Polish economy environment. What favors the suggested approach is the fact that in Poland, unlike in western countries, DEA method has not yet been implemented in order to assess credit risk that companies face. The research described in the article has been conducted on the basis of comparison of suggested DEA method with currently used procedures, namely point method, discriminative analysis and linear regression. Considering the research, it can be concluded that DEA method facilitates forecasting financial problems, including bankruptcy of companies in Polish economic conditions, and its effectiveness is comparable or even greater than approaches implemented so far.  

  9. Using Statistical and Probabilistic Methods to Evaluate Health Risk Assessment: A Case Study

    Directory of Open Access Journals (Sweden)

    Hongjing Wu

    2014-06-01

    Full Text Available The toxic chemical and heavy metals within wastewater can cause serious adverse impacts on human health. Health risk assessment (HRA is an effective tool for supporting decision-making and corrective actions in water quality management. HRA can also help people understand the water quality and quantify the adverse effects of pollutants on human health. Due to the imprecision of data, measurement error and limited available information, uncertainty is inevitable in the HRA process. The purpose of this study is to integrate statistical and probabilistic methods to deal with censored and limited numbers of input data to improve the reliability of the non-cancer HRA of dermal contact exposure to contaminated river water by considering uncertainty. A case study in the Kelligrews River in St. John’s, Canada, was conducted to demonstrate the feasibility and capacity of the proposed approach. Five heavy metals were selected to evaluate the risk level, including arsenic, molybdenum, zinc, uranium and manganese. The results showed that the probability of the total hazard index of dermal exposure exceeding 1 is very low, and there is no obvious evidence of risk in the study area.

  10. Evaluating the risks of clinical research: direct comparative analysis.

    Science.gov (United States)

    Rid, Annette; Abdoler, Emily; Roberson-Nay, Roxann; Pine, Daniel S; Wendler, David

    2014-09-01

    Many guidelines and regulations allow children and adolescents to be enrolled in research without the prospect of clinical benefit when it poses minimal risk. However, few systematic methods exist to determine when research risks are minimal. This situation has led to significant variation in minimal risk judgments, raising concern that some children are not being adequately protected. To address this concern, we describe a new method for implementing the widely endorsed "risks of daily life" standard for minimal risk. This standard defines research risks as minimal when they do not exceed the risks posed by daily life activities or routine examinations. This study employed a conceptual and normative analysis, and use of an illustrative example. Different risks are composed of the same basic elements: Type, likelihood, and magnitude of harm. Hence, one can compare the risks of research and the risks of daily life by comparing the respective basic elements with each other. We use this insight to develop a systematic method, direct comparative analysis, for implementing the "risks of daily life" standard for minimal risk. The method offers a way of evaluating research procedures that pose the same types of risk as daily life activities, such as the risk of experiencing anxiety, stress, or other psychological harm. We thus illustrate how direct comparative analysis can be applied in practice by using it to evaluate whether the anxiety induced by a respiratory CO2 challenge poses minimal or greater than minimal risks in children and adolescents. Direct comparative analysis is a systematic method for applying the "risks of daily life" standard for minimal risk to research procedures that pose the same types of risk as daily life activities. It thereby offers a method to protect children and adolescents in research, while ensuring that important studies are not blocked because of unwarranted concerns about research risks.

  11. Handbook of methods for risk-based analysis of technical specification requirements

    International Nuclear Information System (INIS)

    Samanta, P.K.; Vesely, W.E.

    1994-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements were based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while others may not be conducive to safety. Improvements in these requirements are facilitated by the availability of plant specific Probabilistic Safety Assessments (PSAs). The use of risk and reliability-based methods to improve TS requirements has gained wide interest because these methods can: Quantitatively evaluate the risk and justify changes based on objective risk arguments; Provide a defensible basis for these requirements for regulatory applications. The US NRC Office of Research is sponsoring research to develop systematic risk-based methods to improve various aspects of TS requirements. The handbook of methods, which is being prepared, summarizes such risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), defenses against common-cause failures, managing plant configurations, and scheduling maintenances. For each topic, the handbook summarizes methods of analysis and data needs, outlines the insights to be gained, lists additional references, and presents examples of evaluations

  12. Handbook of methods for risk-based analysis of Technical Specification requirements

    International Nuclear Information System (INIS)

    Samanta, P.K.; Vesely, W.E.

    1993-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements were based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while others may not be conducive to safety. Improvements in these requirements are facilitated by the availability of plant specific Probabilistic Safety Assessments (PSAs). The use of risk and reliability-based methods to improve TS requirements has gained wide interest because these methods can: quantitatively evaluate the risk impact and justify changes based on objective risk arguments. Provide a defensible basis for these requirements for regulatory applications. The United States Nuclear Regulatory Commission (USNRC) Office of Research is sponsoring research to develop systematic risk-based methods to improve various aspects of TS requirements. The handbook of methods, which is being prepared, summarizes such risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), defenses against common-cause failures, managing plant configurations, and scheduling maintenances. For each topic, the handbook summarizes methods of analysis and data needs, outlines the insights to be gained, lists additional references, and presents examples of evaluations

  13. Evaluating emergency risk communications: a dialogue with the experts.

    Science.gov (United States)

    Thomas, Craig W; Vanderford, Marsha L; Crouse Quinn, Sandra

    2008-10-01

    Evaluating emergency risk communications is fraught with challenges since communication can be approached from both a systemic and programmatic level. Therefore, one must consider stakeholders' perspectives, effectiveness issues, standards of evidence and utility, and channels of influence (e.g., mass media and law enforcement). Evaluation issues related to timing, evaluation questions, methods, measures, and accountability are raised in this dialogue with emergency risk communication specialists. Besides the usual evaluation competencies, evaluators in this area need to understand and work collaboratively with stakeholders and be attuned to the dynamic contextual nature of emergency risk communications. Sample resources and measures are provided here to aid in this emerging and exciting field of evaluation.

  14. A Scalable Distribution Network Risk Evaluation Framework via Symbolic Dynamics

    Science.gov (United States)

    Yuan, Kai; Liu, Jian; Liu, Kaipei; Tan, Tianyuan

    2015-01-01

    Background Evaluations of electric power distribution network risks must address the problems of incomplete information and changing dynamics. A risk evaluation framework should be adaptable to a specific situation and an evolving understanding of risk. Methods This study investigates the use of symbolic dynamics to abstract raw data. After introducing symbolic dynamics operators, Kolmogorov-Sinai entropy and Kullback-Leibler relative entropy are used to quantitatively evaluate relationships between risk sub-factors and main factors. For layered risk indicators, where the factors are categorized into four main factors – device, structure, load and special operation – a merging algorithm using operators to calculate the risk factors is discussed. Finally, an example from the Sanya Power Company is given to demonstrate the feasibility of the proposed method. Conclusion Distribution networks are exposed and can be affected by many things. The topology and the operating mode of a distribution network are dynamic, so the faults and their consequences are probabilistic. PMID:25789859

  15. Handbook of methods for risk-based analyses of technical specifications

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Mankamo, T.; Vesely, W.E.

    1994-12-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. The US Nuclear Regulatory Commission (USNRC) Office of Research has sponsored research to develop systematic risk-based methods to improve various aspects of TS requirements. This handbook summarizes these risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), scheduled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), and management of plant configurations resulting from outages of systems, or components. For each topic, the handbook summarizes analytic methods with data needs, outlines the insights to be gained, lists additional references, and gives examples of evaluations

  16. Handbook of methods for risk-based analyses of technical specifications

    Energy Technology Data Exchange (ETDEWEB)

    Samanta, P.K.; Kim, I.S. [Brookhaven National Lab., Upton, NY (United States); Mankamo, T. [Avaplan Oy, Espoo (Finland); Vesely, W.E. [Science Applications International Corp., Dublin, OH (United States)

    1994-12-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. The US Nuclear Regulatory Commission (USNRC) Office of Research has sponsored research to develop systematic risk-based methods to improve various aspects of TS requirements. This handbook summarizes these risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), scheduled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), and management of plant configurations resulting from outages of systems, or components. For each topic, the handbook summarizes analytic methods with data needs, outlines the insights to be gained, lists additional references, and gives examples of evaluations.

  17. Integration of industrial risk in regional policy management. Possibilities of evaluation

    International Nuclear Information System (INIS)

    Hubert, Philippe; Pages, Pierre

    1990-02-01

    Since the responsibility for risk management depends more and more on regional factors, evaluation methods and management regulations are not developed enough. This study start from the fact that an important methods exist for evaluation transport of dangerous materials in cities, risk analysis and emergency plans related to classified installations, management of quality of water, 'chronic' industrial risks at local and regional level, probabilistic estimation for industrial plants. The objective is in fact to show what risk analysis could bring to the municipality, the city or the region [fr

  18. An In Silico Approach for Evaluating a Fraction-Based, Risk Assessment Method for Total Petroleum Hydrocarbon Mixtures

    Directory of Open Access Journals (Sweden)

    Nina Ching Y. Wang

    2012-01-01

    Full Text Available Both the Massachusetts Department of Environmental Protection (MADEP and the Total Petroleum Hydrocarbon Criteria Working Group (TPHCWG developed fraction-based approaches for assessing human health risks posed by total petroleum hydrocarbon (TPH mixtures in the environment. Both organizations defined TPH fractions based on their expected environmental fate and by analytical chemical methods. They derived toxicity values for selected compounds within each fraction and used these as surrogates to assess hazard or risk of exposure to the whole fractions. Membership in a TPH fraction is generally defined by the number of carbon atoms in a compound and by a compound's equivalent carbon (EC number index, which can predict its environmental fate. Here, we systematically and objectively re-evaluate the assignment of TPH to specific fractions using comparative molecular field analysis and hierarchical clustering. The approach is transparent and reproducible, reducing inherent reliance on judgment when toxicity information is limited. Our evaluation of membership in these fractions is highly consistent (̃80% on average across various fractions with the empirical approach of MADEP and TPHCWG. Furthermore, the results support the general methodology of mixture risk assessment to assess both cancer and noncancer risk values after the application of fractionation.

  19. Companies Credit Risk Assessment Methods for Investment Decision Making

    Directory of Open Access Journals (Sweden)

    Dovilė Peškauskaitė

    2017-06-01

    Full Text Available As the banks have tightened lending requirements, companies look for alternative sources of external funding. One of such is bonds issue. Unfortunately, corporate bonds issue as a source of funding is rare in Lithuania. This occurs because companies face with a lack of information, investors fear to take on credit risk. Credit risk is defined as a borrower’s failure to meet its obligation. Investors, in order to avoid credit risk, have to assess the state of the companies. The goal of the article is to determine the most informative methods of credit risk assessment. The article summarizes corporate lending sources, analyzes corporate default causes and credit risk assessment methods. The study based on the SWOT analysis shows that investors before making an investment decision should evaluate both the business risk,using qualitative method CAMPARI, and the financial risk, using financial ratio analysis.

  20. Risk evaluation of accident management strategies

    International Nuclear Information System (INIS)

    Dingman, S.; Camp, A.

    1992-01-01

    The use of Probabilistic Risk Assessment (PRA) methods to evaluate accident management strategies in nuclear power plants discussed in this paper. The PRA framework allows an integrated evaluation to be performed to give the full implications of a particular strategy. The methodology is demonstrated for a particular accident management strategy, intentional depressurization of the reactor coolant system to avoid containment pressurization during the ejection of molten debris at vessel breach

  1. A risk based approach to firm evaluation applied to Dutch industries

    NARCIS (Netherlands)

    E.M. Vermeulen (Erik); J. Spronk (Jaap); D. van der Wijst (Nico)

    1992-01-01

    textabstractIn this paper, a method is developed to evaluate firms on the basis of the risks they face. In accordance with the multi-factor method, risk is represented as a vector of sensitivities for unexpected changes of risk factors. Subsequently, the sensitivities themselves are related to firm

  2. Comparison of methods for prioritizing risk in radiation oncology

    International Nuclear Information System (INIS)

    Biazotto, Bruna; Tokarski, Marcio

    2016-01-01

    Proactive risk management tools, such as Failure Mode and Effect Analysis (FEMA), were imported from engineering and have been widely used in Radiation Oncology. An important step in this process is the risk prioritization and there are many methods to do that. This paper compares the risk prioritization of computerized planning phase in interstitial implants with high dose rate brachytherapy performed with Health Care Failure Mode and Effect Analysis (HFMEA) and FMEA with guidelines given by the Task Group 100 (TG 100) of the American Association of Physicists in Medicine. Out of the 33 possible failure modes of this process, 21 require more attention when evaluated by HFMEA and 22, when evaluated by FMEA TG 100. Despite the high coincidence between the methods, the execution of HFMEA was simpler. (author)

  3. Evaluation of tsunami risk in Heraklion city, Crete, Greece, by using GIS methods

    Science.gov (United States)

    Triantafyllou, Ioanna; Fokaefs, Anna; Novikova, Tatyana; Papadopoulos, Gerasimos A.; Vaitis, Michalis

    2016-04-01

    The Hellenic Arc is the most active seismotectonic structure in the Mediterranean region. The island of Crete occupies the central segment of the arc which is characterized by high seismic and tsunami activity. Several tsunamis generated by large earthquakes, volcanic eruptions and landslides were reported that hit the capital city of Heraklion in the historical past. We focus our tsunami risk study in the northern coastal area of Crete (ca. 6 km in length and 1 km in maximum width) which includes the western part of the city of Heraklion and a large part of the neighboring municipality of Gazi. The evaluation of tsunami risk included calculations and mapping with QGIS of (1) cost for repairing buildings after tsunami damage, (2) population exposed to tsunami attack, (3) optimum routes and times for evacuation. To calculate the cost for building reparation after a tsunami attack we have determined the tsunami inundation zone in the study area after numerical simulations for extreme tsunami scenarios. The geographical distribution of buildings per building block, obtained from the 2011 census data of the Hellenic Statistical Authority (EL.STAT) and satellite data, was mapped. By applying the SCHEMA Damage Tool we assessed the building vulnerability to tsunamis according to the types of buildings and their expected damage from the hydrodynamic impact. A set of official cost rates varying with the building types and the damage levels, following standards set by the state after the strong damaging earthquakes in Greece in 2014, was applied to calculate the cost of rebuilding or repairing buildings damaged by the tsunami. In the investigation of the population exposed to tsunami inundation we have used the interpolation method to smooth out the population geographical distribution per building block within the inundation zone. Then, the population distribution was correlated with tsunami hydrodynamic parameters in the inundation zone. The last approach of tsunami risk

  4. From risk analysis to risk control in land transport of dangerous materials. Contribution of quantitative evaluation

    International Nuclear Information System (INIS)

    Hubert, Ph.; Pages, P.

    1985-03-01

    The different approaches of risks and risk management system are described: statistics, potential risk, prevention, information and intervention. Quantitative evaluation is developed: data collection, purposes and methods. Two examples of application are given on risks associated to road transport of propane and of uranium hexafluoride. In conclusion level of risk and practical use of studies on risks are examined. 41 refs [fr

  5. Current imaging methods for evaluation of metabolic risk in pediatric patients

    International Nuclear Information System (INIS)

    Balev, B.; Lateva, M.; Popova, R.; Teneva, Ts.; Iotova, V.

    2013-01-01

    Full text: Introduction: The incidence of cardio - metabolic diseases increase in an increasingly early age is one of the challenges of the 21st century. This phenomenon is attributed largely of the obesity epidemic, it is particularly significant when the obesity occurs in childhood - obese children have a greater probability of developing cardiovascular disease and diabetes earlier. What you will learn: The significance of the obesity epidemic in childhood and metabolic risk increase; The compartment of adipose tissue and their role in maintaining metabolic balance and its breach; The importance of imaging methods in recent studies related to obesity and cardio - metabolic diseases in children; New imaging methods for proofing of pathological fat accumulation in other tissues and organs and their role in the study of metabolic disorders. Discussion: Various studies of pathology at obesity prove that obesity indicators are not sufficient for individualized assessment of cardio - metabolic risk. Only by imaging methods, information about the accumulated fat in metabolically more active visceral and ectopic adipose tissue depots has been obtained. The most common imaging techniques for analysis of body composition and adiposity in children - dual-energy X-ray absorptiometry (DXA), ultrasound , computed tomography ( CT) scan , magnetic resonance imaging ( MRI), magnetic resonance spectroscopy (MRS) will be presented. Conclusion: The imaging methods are widely used in the obesity and metabolic risk studies, as the trend is to be applied increasingly into practice. The results from Imaging studies affect not only to therapeutic approach, but also to the motivation of parents and patients to comply prescribed measures

  6. Evaluation of Cyber Security and Modelling of Risk Propagation with Petri Nets

    Directory of Open Access Journals (Sweden)

    Marcin Szpyrka

    2017-02-01

    Full Text Available This article presents a new method of risk propagation among associated elements. On thebasis of coloured Petri nets, a new class called propagation nets is defined. This class providesa formal model of a risk propagation. The proposed method allows for model relations betweennodes forming the network structure. Additionally, it takes into account the bidirectional relationsbetween components as well as relations between isomorphic, symmetrical components in variousbranches of the network. This method is agnostic in terms of use in various systems and it canbe adapted to the propagation model of any systems’ characteristics; however, it is intentionallyproposed to assess the risk of critical infrastructures. In this paper, as a proof of concept example, weshow the formal model of risk propagation proposed within the project Cyberspace Security ThreatsEvaluation System of the Republic of Poland. In the article, the idea of the method is presented aswell as its use case for evaluation of risk for cyber threats. With the adaptation of Petri nets, it ispossible to evaluate the risk for the particular node and assess the impact of this risk for all relatednodes including hierarchic relations of components as well as isomorphism of elements.

  7. Comparative analysis of assessment methods for operational and anesthetic risks in ulcerative gastroduodenal bleeding

    Directory of Open Access Journals (Sweden)

    Potakhin S.N.

    2015-09-01

    Full Text Available Aim of the investigation: to conduct a comparative analysis of methods of evaluation of surgical and anesthetic risks in ulcerative gastroduodenal bleeding. Materials and methods. A retrospective analysis ofthe extent of the surgical and anesthetic risks and results of treatment of 71 patients with peptic ulcer bleeding has been conducted in the study. To evaluate the surgical and anesthetic risks classification trees are used, scale ТА. Rockall and prognosis System of rebleeding (SPRK, proposed by N. V. Lebedev et al. in 2009, enabling to evaluate the probability of a fatal outcome. To compare the efficacy ofthe methods the following indicators are used: sensitivity, specificity and prediction of positive result. Results. The study compared the results ofthe risk assessment emergency operation by using these methods with the outcome ofthe operation. The comparison ofthe prognosis results in sensitivity leads to the conclusion that the scales ТА. Rockall and SPRK are worse than the developed method of classification trees in recognizing patients with poor outcome of surgery. Conclusion. The method of classification trees can be considered as the most accurate method of evaluation of surgical and anesthetic risks in ulcerative gastroduodenal bleeding.

  8. A modified risk evaluation method of slope failure in a heavy rain. For application to slopes in widespread area

    International Nuclear Information System (INIS)

    Suenaga, Hiroshi; Tanaka, Shiro; Kobayakawa, Hiroaki

    2015-01-01

    A risk evaluation method of slope failure has developed to combine gas-liquid two phase flow analysis as a rainfall infiltration analysis and elastic-plastic finite element analysis as a slope stability analysis and has applied to a slope field. This method, however, had a difficulty to apply to many slopes since it needed many parameters to calculate the risk of the slope failure. The method was simplified to lessen input parameters which included an inclination and length of a slope, a depth of bedrock and a rainfall pattern assuming that hydraulic properties and mechanical properties were similar for the same geological unit. The method was also modified to represent a water collection structure, a surface runoff, an existence of a forest road and a water level variation of a downward river / pond which could affect infiltration phenomena. Results of the simplification and the modification made it possible to enhance a prediction precision of the method and create a hazard map of slopes in widespread area. (author)

  9. Development of risk benefit structural design method for innovative reactor plants

    International Nuclear Information System (INIS)

    Yoshio Kamishima; Tai Asayama; Yukio Takahashi; Masanori Tashimo; Hideo Machida; Yomomi Otani; Yasuharu Chuman

    2005-01-01

    The development of innovative nuclear plants where the energy in the future is carried out in Japan. The design method based on a risk benefit of having maintained mitigation of a risk and the improvement in economy is called for, in order to realize the national innovative nuclear plants. Main key technologies of the risk benefit structural design method are crack propagation evaluation technology and structural reliability evaluation technology. This research aims at pulling up these two technologies on an engineering practical use level. In this paper, requirements from the design of typical innovative nuclear plants and research plan are shown.(authors)

  10. Methods to estimate the genetic risk

    International Nuclear Information System (INIS)

    Ehling, U.H.

    1989-01-01

    The estimation of the radiation-induced genetic risk to human populations is based on the extrapolation of results from animal experiments. Radiation-induced mutations are stochastic events. The probability of the event depends on the dose; the degree of the damage dose not. There are two main approaches in making genetic risk estimates. One of these, termed the direct method, expresses risk in terms of expected frequencies of genetic changes induced per unit dose. The other, referred to as the doubling dose method or the indirect method, expresses risk in relation to the observed incidence of genetic disorders now present in man. The advantage of the indirect method is that not only can Mendelian mutations be quantified, but also other types of genetic disorders. The disadvantages of the method are the uncertainties in determining the current incidence of genetic disorders in human and, in addition, the estimasion of the genetic component of congenital anomalies, anomalies expressed later and constitutional and degenerative diseases. Using the direct method we estimated that 20-50 dominant radiation-induced mutations would be expected in 19 000 offspring born to parents exposed in Hiroshima and Nagasaki, but only a small proportion of these mutants would have been detected with the techniques used for the population study. These methods were used to predict the genetic damage from the fallout of the reactor accident at Chernobyl in the vicinity of Southern Germany. The lack of knowledge for the interaction of chemicals with ionizing radiation and the discrepancy between the high safety standards for radiation protection and the low level of knowledge for the toxicological evaluation of chemical mutagens will be emphasized. (author)

  11. Critical review of methods for risk ranking of food-related hazards, based on risks for human health.

    Science.gov (United States)

    Van der Fels-Klerx, H J; Van Asselt, E D; Raley, M; Poulsen, M; Korsgaard, H; Bredsdorff, L; Nauta, M; D'agostino, M; Coles, D; Marvin, H J P; Frewer, L J

    2018-01-22

    This study aimed to critically review methods for ranking risks related to food safety and dietary hazards on the basis of their anticipated human health impacts. A literature review was performed to identify and characterize methods for risk ranking from the fields of food, environmental science and socio-economic sciences. The review used a predefined search protocol, and covered the bibliographic databases Scopus, CAB Abstracts, Web of Sciences, and PubMed over the period 1993-2013. All references deemed relevant, on the basis of predefined evaluation criteria, were included in the review, and the risk ranking method characterized. The methods were then clustered-based on their characteristics-into eleven method categories. These categories included: risk assessment, comparative risk assessment, risk ratio method, scoring method, cost of illness, health adjusted life years (HALY), multi-criteria decision analysis, risk matrix, flow charts/decision trees, stated preference techniques and expert synthesis. Method categories were described by their characteristics, weaknesses and strengths, data resources, and fields of applications. It was concluded there is no single best method for risk ranking. The method to be used should be selected on the basis of risk manager/assessor requirements, data availability, and the characteristics of the method. Recommendations for future use and application are provided.

  12. Risk management method for small photovoltaic plants

    Directory of Open Access Journals (Sweden)

    Kirova Milena

    2016-09-01

    Full Text Available Risk management is necessary for achieving the goals of the organization. There are many methods, approaches, and instruments in the literature concerning risk management. However, these are often highly specialized and transferring them to a different field can prove difficult. Therefore, managers often face situations where they have no tools to use for risk management. This is the case with small photovoltaic plants (according to a definition by the Bulgarian State Energy and Water Regulatory Commission small applies to systems with a total installed power of 200 kWp. There are some good practices in the energy field for minimizing risks, but they offer only partial risk prevention and are not sufficient. Therefore a new risk management method needs to be introduced. Small photovoltaic plants offer plenty of advantages in comparison to the other renewable energy sources which makes risk management in their case more important. There is no classification of risks for the exploitation of small photovoltaic systems in the available literature as well as to what degree the damages from those risks could spread. This makes risk analysis and evaluation necessary for obtaining information which could aid taking decisions for improving risk management. The owner of the invested capital takes a decision regarding the degree of acceptable risk for his organization and it must be protected depending on the goals set. Investors in small photovoltaic systems need to decide to what degree the existing risks can influence the goals previously set, the payback of the investment, and what is the acceptable level of damages for the investor. The purpose of this work is to present a risk management method, which currently does not exist in the Bulgaria, so that the risks and the damages that could occur during the exploitation of small photovoltaic plants could be identified and the investment in such technology – justified.

  13. Credit Risk Evaluation of Swedish SMEs : A Banking Sector Perspective

    OpenAIRE

    Hörstedt, Maria; Linjamaa, Johanna

    2015-01-01

    As a result from the latest financial crisis, the banking industry has undergone major modifications during the last years in order to limit banks’ risks. A vast majority of existing literature tends to focus upon credit risk evaluation methods and techniques mainly concerning quantitative measures and large companies. Thus, the lack of research regarding credit risk evaluation of SMEs is profound, especially considering Sweden. With the dominant market share of SMEs compared to large corpora...

  14. Analysis of the LaSalle Unit 2 nuclear power plant: Risk Methods Integration and Evaluation Program (RMIEP)

    International Nuclear Information System (INIS)

    Wells, J.E.; Lappa, D.A.; Bernreuter, D.L.; Chen, J.C.; Chuang, T.Y.; Johnson, J.J.; Campbell, R.D.; Hashimoto, P.S.; Maslenikov, O.R.; Tiong, L.W.; Ravindra, M.K.; Kincaid, R.H.; Sues, R.H.; Putcha, C.S.

    1993-11-01

    This report describes the methodology used and the results obtained from the application of a simplified seismic risk methodology to the LaSalle County Nuclear Generating Station Unit 2. This study is part of the Level I analysis being performed by the Risk Methods Integration and Evaluation Program (RMIEP). Using the RMIEP developed event and fault trees, the analysis resulted in a seismically induced core damage frequency point estimate of 6.OE-7/yr. This result, combined with the component importance analysis, indicated that system failures were dominated by random events. The dominant components included diesel generator failures (failure to swing, failure to start, failure to run after started), and condensate storage tank

  15. Methods for external event screening quantification: Risk Methods Integration and Evaluation Program (RMIEP) methods development

    International Nuclear Information System (INIS)

    Ravindra, M.K.; Banon, H.

    1992-07-01

    In this report, the scoping quantification procedures for external events in probabilistic risk assessments of nuclear power plants are described. External event analysis in a PRA has three important goals; (1) the analysis should be complete in that all events are considered; (2) by following some selected screening criteria, the more significant events are identified for detailed analysis; (3) the selected events are analyzed in depth by taking into account the unique features of the events: hazard, fragility of structures and equipment, external-event initiated accident sequences, etc. Based on the above goals, external event analysis may be considered as a three-stage process: Stage I: Identification and Initial Screening of External Events; Stage II: Bounding Analysis; Stage III: Detailed Risk Analysis. In the present report, first, a review of published PRAs is given to focus on the significance and treatment of external events in full-scope PRAs. Except for seismic, flooding, fire, and extreme wind events, the contributions of other external events to plant risk have been found to be negligible. Second, scoping methods for external events not covered in detail in the NRC's PRA Procedures Guide are provided. For this purpose, bounding analyses for transportation accidents, extreme winds and tornadoes, aircraft impacts, turbine missiles, and chemical release are described

  16. Non-animal approaches for toxicokinetics in risk evaluations of food chemicals.

    Science.gov (United States)

    Punt, Ans; Peijnenburg, Ad A C M; Hoogenboom, Ron L A P; Bouwmeester, Hans

    2017-01-01

    The objective of the present work was to review the availability and predictive value of non-animal toxicokinetic approaches and to evaluate their current use in European risk evaluations of food contaminants, additives and food contact materials, as well as pesticides and medicines. Results revealed little use of quantitative animal or human kinetic data in risk evaluations of food chemicals, compared with pesticides and medicines. Risk evaluations of medicines provided sufficient in vivo kinetic data from different species to evaluate the predictive value of animal kinetic data for humans. These data showed a relatively poor correlation between the in vivo bioavailability in rats and dogs versus that in humans. In contrast, in vitro (human) kinetic data have been demonstrated to provide adequate predictions of the fate of compounds in humans, using appropriate in vitro-in vivo scalers and by integration of in vitro kinetic data with in silico kinetic modelling. Even though in vitro kinetic data were found to be occasionally included within risk evaluations of food chemicals, particularly results from Caco-2 absorption experiments and in vitro data on gut-microbial conversions, only minor use of in vitro methods for metabolism and quantitative in vitro-in vivo extrapolation methods was identified. Yet, such quantitative predictions are essential in the development of alternatives to animal testing as well as to increase human relevance of toxicological risk evaluations. Future research should aim at further improving and validating quantitative alternative methods for kinetics, thereby increasing regulatory acceptance of non-animal kinetic data.

  17. The Application of VaR Method to Risk Evaluation of Bank Loans%VaR方法在银行贷款风险评估中的应用

    Institute of Scientific and Technical Information of China (English)

    邹新月

    2005-01-01

    Value-at-Risk model developed recently is a mathemetical medol to measure and monitor market risk. The article focuses on discussing calculate procedure and calculate method about applying VaR means for the bank loan risk in evaluation, we make clear differentiate both the Bank for International Settlements draw credit risk reserve and VaR means calculate bank loan risk value, find VaR means in application practicality value and extensity perspective in our bank loan risk for evaluation

  18. Ensemble of trees approaches to risk adjustment for evaluating a hospital's performance.

    Science.gov (United States)

    Liu, Yang; Traskin, Mikhail; Lorch, Scott A; George, Edward I; Small, Dylan

    2015-03-01

    A commonly used method for evaluating a hospital's performance on an outcome is to compare the hospital's observed outcome rate to the hospital's expected outcome rate given its patient (case) mix and service. The process of calculating the hospital's expected outcome rate given its patient mix and service is called risk adjustment (Iezzoni 1997). Risk adjustment is critical for accurately evaluating and comparing hospitals' performances since we would not want to unfairly penalize a hospital just because it treats sicker patients. The key to risk adjustment is accurately estimating the probability of an Outcome given patient characteristics. For cases with binary outcomes, the method that is commonly used in risk adjustment is logistic regression. In this paper, we consider ensemble of trees methods as alternatives for risk adjustment, including random forests and Bayesian additive regression trees (BART). Both random forests and BART are modern machine learning methods that have been shown recently to have excellent performance for prediction of outcomes in many settings. We apply these methods to carry out risk adjustment for the performance of neonatal intensive care units (NICU). We show that these ensemble of trees methods outperform logistic regression in predicting mortality among babies treated in NICU, and provide a superior method of risk adjustment compared to logistic regression.

  19. Risk evaluation: A cost-oriented approach

    International Nuclear Information System (INIS)

    Rogers, B.H.

    1998-01-01

    This method provides a structured and cost-oriented way to determine risks associated with loss and destruction of industrial security interests consisting of material assets and human resources. Loss and destruction are assumed to be adversary perpetrated, high-impact events in which the health and safety of people or high-value property is at risk. This concept provides a process for: (1) assessing effectiveness of all integrated protection system, which includes facility operations, safety, emergency and security systems, and (2) a qualitative prioritization scheme to determine the level of consequence relative to cost and subsequent risk. The method allows managers the flexibility to establish asset protection appropriate to programmatic requirements and priorities and to decide if funding is appropriate. The evaluation objectives are to: (1) provide for a systematic, qualitative tabletop process to estimate the potential for an undesirable event and its impact; and (2) identify ineffective protection and cost-effective solutions

  20. Contract Design: Risk Management and Evaluation.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent's returns on the provider's gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment have widely differing model and forecast

  1. Handbook of methods for risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Mankamo, T.; Vesely, W.E.

    1996-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operations (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analyses and engineering judgments. Improvements in these requirements are facilitated by the availability of plant-specific Probabilistic Risk Assessments (PRAs). The US Nuclear Regulatory Commission (USNRC) Office of Research sponsored research to develop systematic, risk-based methods to improve various aspects of TS requirements. A handbook of methods summarizing such risk-based approaches has been completed in 1994. It is expected that this handbook will provide valuable input to NRC's present work in developing guidance for using PRA in risk-informed regulation. The handbook addresses reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), managing plant configurations, and scheduling maintenance

  2. Evaluation of methods to compare consequences from hazardous materials transportation accidents

    International Nuclear Information System (INIS)

    Rhoads, R.E.; Franklin, A.L.; Lavender, J.C.

    1986-10-01

    This report presents the results of a project to develop a framework for making meaningful comparisons of the consequences from transportation accidents involving hazardous materials. The project was conducted in two phases. In Phase I, methods that could potentially be used to develop the consequence comparisons for hazardous material transportation accidents were identified and reviewed. Potential improvements were identified and an evaluation of the improved methods was performed. Based on this evaluation, several methods were selected for detailed evaluation in Phase II of the project. The methods selected were location-dependent scenarios, figure of merit and risk assessment. This evaluation included application of the methods to a sample problem which compares the consequences of four representative hazardous materials - chlorine, propane, spent nuclear fuel and class A explosives. These materials were selected because they represented a broad class of hazardous material properties and consequence mechanisms. The sample case aplication relied extensively on consequence calculations performed in previous transportation risk assessment studies. A consultant was employed to assist in developing consequence models for explosives. The results of the detailed evaluation of the three consequence comparison methods indicates that methods are available to perform technically defensible comparisons of the consequences from a wide variety of hazardous materials. Location-dependent scenario and risk assessment methods are available now and the figure of merit method could be developed with additional effort. All of the methods require substantial effort to implement. Methods that would require substantially less effort were identified in the preliminary evaluation, but questions of technical accuracy preclude their application on a scale. These methods may have application to specific cases, however

  3. Contract Design: Risk Management and Evaluation

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial dependence of the agent’s returns on the provider’s gain level. Integrated care systems as well as accountable care organisations (ACOs in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced.  Methods: Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting.  Results: Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods

  4. Applied decision analysis and risk evaluation

    International Nuclear Information System (INIS)

    Ferse, W.; Kruber, S.

    1995-01-01

    During 1994 the workgroup 'Applied Decision Analysis and Risk Evaluation; continued the work on the knowledge based decision support system XUMA-GEFA for the evaluation of the hazard potential of contaminated sites. Additionally a new research direction was started which aims at the support of a later stage of the treatment of contaminated sites: The clean-up decision. For the support of decisions arising at this stage, the methods of decision analysis will be used. Computational aids for evaluation and decision support were implemented and a case study at a waste disposal site in Saxony which turns out to be a danger for the surrounding groundwater ressource was initiated. (orig.)

  5. Systematic Review of Health Economic Impact Evaluations of Risk Prediction Models : Stop Developing, Start Evaluating

    NARCIS (Netherlands)

    van Giessen, Anoukh; Peters, Jaime; Wilcher, Britni; Hyde, Chris; Moons, Carl; de Wit, Ardine; Koffijberg, Erik

    2017-01-01

    Background: Although health economic evaluations (HEEs) are increasingly common for therapeutic interventions, they appear to be rare for the use of risk prediction models (PMs). Objectives: To evaluate the current state of HEEs of PMs by performing a comprehensive systematic review. Methods: Four

  6. Methodology implementation in order to evaluate the biological risks in the Centre for Research and Rehabilitation of Hereditary Ataxias of Cuba: a biosecurity surveillance method

    Directory of Open Access Journals (Sweden)

    Dailín Cobos Valdes

    2014-12-01

    Full Text Available Introduction: The Center for Research and Rehabilitation of Hereditary Ataxias faces biological risks. Nevertheless a Biosafety system was not yet implemented. Objective: To apply the methodology in order to evaluate these risks Materials and Methods: Interview with the researchers of the center and the use of the methodology for evaluating biological risks designed for Cobos, 2009. Results: Fifty-three biological risks were identified and evaluated, 32 as moderated, 18 as tolerable and 3 as trivial. Such classification are crucial to establish its management priorities and represent a way of surveillance in Biosafety field. Conclusion: The results of this research represent an essential factor for the Biosafety documentation development adapted to the Center and according to the legal basis in terms of biological safety in Cuba.

  7. Evaluations and utilizations of risk importances

    International Nuclear Information System (INIS)

    Vesely, W.E.; Davis, T.C.

    1985-08-01

    This report presents approaches for utilizing Probabilistic Risk Analyses (PRA's) to determine risk importances. Risk importances are determined for design features, plant operations, and other factors that can affect risk. PRA's can be used to identify the importances of risk contributors or proposed changes to designs or operations. The objective of this report is to serve as a handbook and guide in evaluating and applying risk importances. The utilization of both qualitative risk importances and quantitative risk importances is described in this report. Qualitative risk importances are based on the logic models in the PRA, while quantitative risk importances are based on the quantitative results of the PRA. Both types of importances are among the most robust and meaningful information a PRA can provide. A wide variety of risk importance evaluations are described including evaluations of the importances of design changes, testing, maintenance, degrading environments, and aging. Specific utilizations are described in inspection and in reliability assurance programs, however the general approaches have widespread applicability. The role of personal computers and decision support programs in applying risk importance evaluations is also described

  8. Web Applications Vulnerability Management using a Quantitative Stochastic Risk Modeling Method

    Directory of Open Access Journals (Sweden)

    Sergiu SECHEL

    2017-01-01

    Full Text Available The aim of this research is to propose a quantitative risk modeling method that reduces the guess work and uncertainty from the vulnerability and risk assessment activities of web based applications while providing users the flexibility to assess risk according to their risk appetite and tolerance with a high degree of assurance. The research method is based on the research done by the OWASP Foundation on this subject but their risk rating methodology needed de-bugging and updates in different in key areas that are presented in this paper. The modified risk modeling method uses Monte Carlo simulations to model risk characteristics that can’t be determined without guess work and it was tested in vulnerability assessment activities on real production systems and in theory by assigning discrete uniform assumptions to all risk charac-teristics (risk attributes and evaluate the results after 1.5 million rounds of Monte Carlo simu-lations.

  9. Risk Evaluation of Railway Coal Transportation Network Based on Multi Level Grey Evaluation Model

    Science.gov (United States)

    Niu, Wei; Wang, Xifu

    2018-01-01

    The railway transport mode is currently the most important way of coal transportation, and now China’s railway coal transportation network has become increasingly perfect, but there is still insufficient capacity, some lines close to saturation and other issues. In this paper, the theory and method of risk assessment, analytic hierarchy process and multi-level gray evaluation model are applied to the risk evaluation of coal railway transportation network in China. Based on the example analysis of Shanxi railway coal transportation network, to improve the internal structure and the competitiveness of the market.

  10. TU-FG-201-11: Evaluating the Validity of Prospective Risk Analysis Methods: A Comparison of Traditional FMEA and Modified Healthcare FMEA

    Energy Technology Data Exchange (ETDEWEB)

    Lah, J [Myongji Hospital, Goyang-si (Korea, Republic of); Manger, R; Kim, G [University of California, San Diego, La Jolla, CA (United States)

    2016-06-15

    Purpose: To examine the ability of traditional Failure mode and effects analysis (FMEA) and a light version of Healthcare FMEA (HFMEA), called Scenario analysis of FMEA (SAFER) by comparing their outputs in terms of the risks identified and their severity rankings. Methods: We applied two prospective methods of the quality management to surface image guided, linac-based radiosurgery (SIG-RS). For the traditional FMEA, decisions on how to improve an operation are based on risk priority number (RPN). RPN is a product of three indices: occurrence, severity and detectability. The SAFER approach; utilized two indices-frequency and severity-which were defined by a multidisciplinary team. A criticality matrix was divided into 4 categories; very low, low, high and very high. For high risk events, an additional evaluation was performed. Based upon the criticality of the process, it was decided if additional safety measures were needed and what they comprise. Results: Two methods were independently compared to determine if the results and rated risks were matching or not. Our results showed an agreement of 67% between FMEA and SAFER approaches for the 15 riskiest SIG-specific failure modes. The main differences between the two approaches were the distribution of the values and the failure modes (No.52, 54, 154) that have high SAFER scores do not necessarily have high FMEA RPN scores. In our results, there were additional risks identified by both methods with little correspondence. In the SAFER, when the risk score is determined, the basis of the established decision tree or the failure mode should be more investigated. Conclusion: The FMEA method takes into account the probability that an error passes without being detected. SAFER is inductive because it requires the identification of the consequences from causes, and semi-quantitative since it allow the prioritization of risks and mitigation measures, and thus is perfectly applicable to clinical parts of radiotherapy.

  11. TU-FG-201-11: Evaluating the Validity of Prospective Risk Analysis Methods: A Comparison of Traditional FMEA and Modified Healthcare FMEA

    International Nuclear Information System (INIS)

    Lah, J; Manger, R; Kim, G

    2016-01-01

    Purpose: To examine the ability of traditional Failure mode and effects analysis (FMEA) and a light version of Healthcare FMEA (HFMEA), called Scenario analysis of FMEA (SAFER) by comparing their outputs in terms of the risks identified and their severity rankings. Methods: We applied two prospective methods of the quality management to surface image guided, linac-based radiosurgery (SIG-RS). For the traditional FMEA, decisions on how to improve an operation are based on risk priority number (RPN). RPN is a product of three indices: occurrence, severity and detectability. The SAFER approach; utilized two indices-frequency and severity-which were defined by a multidisciplinary team. A criticality matrix was divided into 4 categories; very low, low, high and very high. For high risk events, an additional evaluation was performed. Based upon the criticality of the process, it was decided if additional safety measures were needed and what they comprise. Results: Two methods were independently compared to determine if the results and rated risks were matching or not. Our results showed an agreement of 67% between FMEA and SAFER approaches for the 15 riskiest SIG-specific failure modes. The main differences between the two approaches were the distribution of the values and the failure modes (No.52, 54, 154) that have high SAFER scores do not necessarily have high FMEA RPN scores. In our results, there were additional risks identified by both methods with little correspondence. In the SAFER, when the risk score is determined, the basis of the established decision tree or the failure mode should be more investigated. Conclusion: The FMEA method takes into account the probability that an error passes without being detected. SAFER is inductive because it requires the identification of the consequences from causes, and semi-quantitative since it allow the prioritization of risks and mitigation measures, and thus is perfectly applicable to clinical parts of radiotherapy.

  12. Risk prediction, safety analysis and quantitative probability methods - a caveat

    International Nuclear Information System (INIS)

    Critchley, O.H.

    1976-01-01

    Views are expressed on the use of quantitative techniques for the determination of value judgements in nuclear safety assessments, hazard evaluation, and risk prediction. Caution is urged when attempts are made to quantify value judgements in the field of nuclear safety. Criteria are given the meaningful application of reliability methods but doubts are expressed about their application to safety analysis, risk prediction and design guidances for experimental or prototype plant. Doubts are also expressed about some concomitant methods of population dose evaluation. The complexities of new designs of nuclear power plants make the problem of safety assessment more difficult but some possible approaches are suggested as alternatives to the quantitative techniques criticized. (U.K.)

  13. A Bayesian method to mine spatial data sets to evaluate the vulnerability of human beings to catastrophic risk.

    Science.gov (United States)

    Li, Lianfa; Wang, Jinfeng; Leung, Hareton; Zhao, Sisi

    2012-06-01

    Vulnerability of human beings exposed to a catastrophic disaster is affected by multiple factors that include hazard intensity, environment, and individual characteristics. The traditional approach to vulnerability assessment, based on the aggregate-area method and unsupervised learning, cannot incorporate spatial information; thus, vulnerability can be only roughly assessed. In this article, we propose Bayesian network (BN) and spatial analysis techniques to mine spatial data sets to evaluate the vulnerability of human beings. In our approach, spatial analysis is leveraged to preprocess the data; for example, kernel density analysis (KDA) and accumulative road cost surface modeling (ARCSM) are employed to quantify the influence of geofeatures on vulnerability and relate such influence to spatial distance. The knowledge- and data-based BN provides a consistent platform to integrate a variety of factors, including those extracted by KDA and ARCSM to model vulnerability uncertainty. We also consider the model's uncertainty and use the Bayesian model average and Occam's Window to average the multiple models obtained by our approach to robust prediction of the risk and vulnerability. We compare our approach with other probabilistic models in the case study of seismic risk and conclude that our approach is a good means to mining spatial data sets for evaluating vulnerability. © 2012 Society for Risk Analysis.

  14. Sustainability Risk Evaluation for Large-Scale Hydropower Projects with Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Weiyao Tang

    2018-01-01

    Full Text Available As large-scale hydropower projects are influenced by many factors, risk evaluations are complex. This paper considers a hydropower project as a complex system from the perspective of sustainability risk, and divides it into three subsystems: the natural environment subsystem, the eco-environment subsystem and the socioeconomic subsystem. Risk-related factors and quantitative dimensions of each subsystem are comprehensively analyzed considering uncertainty of some quantitative dimensions solved by hybrid uncertainty methods, including fuzzy (e.g., the national health degree, the national happiness degree, the protection of cultural heritage, random (e.g., underground water levels, river width, and fuzzy random uncertainty (e.g., runoff volumes, precipitation. By calculating the sustainability risk-related degree in each of the risk-related factors, a sustainable risk-evaluation model is built. Based on the calculation results, the critical sustainability risk-related factors are identified and targeted to reduce the losses caused by sustainability risk factors of the hydropower project. A case study at the under-construction Baihetan hydropower station is presented to demonstrate the viability of the risk-evaluation model and to provide a reference for the sustainable risk evaluation of other large-scale hydropower projects.

  15. Evaluation of the Prostate Cancer Prevention Trial Risk Calculator in a High-Risk Screening Population

    Science.gov (United States)

    Kaplan, David J.; Boorjian, Stephen A.; Ruth, Karen; Egleston, Brian L.; Chen, David Y.T.; Viterbo, Rosalia; Uzzo, Robert G.; Buyyounouski, Mark K.; Raysor, Susan; Giri, Veda N.

    2009-01-01

    Introduction Clinical factors in addition to PSA have been evaluated to improve risk assessment for prostate cancer. The Prostate Cancer Prevention Trial (PCPT) risk calculator provides an assessment of prostate cancer risk based on age, PSA, race, prior biopsy, and family history. This study evaluated the risk calculator in a screening cohort of young, racially diverse, high-risk men with a low baseline PSA enrolled in the Prostate Cancer Risk Assessment Program. Patients and Methods Eligibility for PRAP include men ages 35-69 who are African-American, have a family history of prostate cancer, or have a known BRCA1/2 mutation. PCPT risk scores were determined for PRAP participants, and were compared to observed prostate cancer rates. Results 624 participants were evaluated, including 382 (61.2%) African-American men and 375 (60%) men with a family history of prostate cancer. Median age was 49.0 years (range 34.0-69.0), and median PSA was 0.9 (range 0.1-27.2). PCPT risk score correlated with prostate cancer diagnosis, as the median baseline risk score in patients diagnosed with prostate cancer was 31.3%, versus 14.2% in patients not diagnosed with prostate cancer (p<0.0001). The PCPT calculator similarly stratified the risk of diagnosis of Gleason score ≥7 disease, as the median risk score was 36.2% in patients diagnosed with Gleason ≥7 prostate cancer versus 15.2% in all other participants (p<0.0001). Conclusion PCPT risk calculator score was found to stratify prostate cancer risk in a cohort of young, primarily African-American men with a low baseline PSA. These results support further evaluation of this predictive tool for prostate cancer risk assessment in high-risk men. PMID:19709072

  16. LOGISTICS RISK RESEARCH OF PREFABRICATED HOUSE CONSTRUCTION ENGINEERING BASED ON CREDIBILITY METHOD

    Directory of Open Access Journals (Sweden)

    Xiaoping Bai

    2017-07-01

    Full Text Available In recent years, the prefabricated house industry has rapid development,.Because of fewer suppliers, higher demand transport scheme and complex quality test, the risks of construction engineering logistics links are relatively high. Studying how to effectively evaluate the risks of construction engineering logistics links is significant. According to the characteristics of the prefabricated house construction engineering, we analyse the construction engineering logistics risks and use the combined weights method to determine the weight of indexes which contains both subjective and objective factors, to improve the scientific value and the validity of the assessment. Based on credibility measure method, a new logistics risk evaluation model in prefabricated housing is established to estimate the risk during making prefabricated house construction engineering. The presented model can avoid the subjectivity of selecting the membership function and solve the problem of how to comprehensively assess the construction engineering logistics risk in a certain extent.

  17. Seismic risk evaluation for high voltage air insulated substations

    International Nuclear Information System (INIS)

    Camensig, Carlo; Bresesti, Luca; Clementel, Stefano; Salvetti, Maurizio

    1997-01-01

    This paper describes the results of the analytical and experimental activities performed by ISMES for the evaluation of the structural reliability of electrical substations with respect to seismic events. In the following, the reference station is described along with the methods used to define the site seismic input, the analytical and experimental evaluation of the components' fragility curves and the whole station seismic risk evaluation

  18. Study on the evaluation system for the coal safety management based on risk pre-control

    Institute of Scientific and Technical Information of China (English)

    LI Xin-chun; XU Hai-xia; WANG Pei; SONG Xue-feng

    2009-01-01

    The new type of risk management is process management.First,the hazard sources are identified before coal mine accidents occur,and then the pre-control measure and information monitoring method based on classifying the hidden hazard sources are given.Lastly,the risk pre-alarm and risk control method are confirmed,the management standard and management measure are used to eliminate the hidden hazard sources.In this study,an evaluation system is built to evaluate the result of risk management.

  19. Assessment of Methods for Estimating Risk to Birds from ...

    Science.gov (United States)

    The U.S. EPA Ecological Risk Assessment Support Center (ERASC) announced the release of the final report entitled, Assessment of Methods for Estimating Risk to Birds from Ingestion of Contaminated Grit Particles. This report evaluates approaches for estimating the probability of ingestion by birds of contaminated particles such as pesticide granules or lead particles (i.e. shot or bullet fragments). In addition, it presents an approach for using this information to estimate the risk of mortality to birds from ingestion of lead particles. Response to ERASC Request #16

  20. Tsunami risk assessment for facility group over a wide area using inundation assessment method considering energy conservation law

    International Nuclear Information System (INIS)

    Fukutani, Yo; Imamura, Fumihiko; Tokunaga, Takeshi; Sato, Ichiro

    2015-01-01

    We propose a quantitative evaluation method of overall tsunami risk that the entire facility group over a wide area holds. We considerably reduced the calculation cost for tsunami inundation depth by adopting the evaluation method using energy conservation law as compared with the evaluation method using non-linear long wave equation. For financial institutions such as banks and insurance companies with contractors over a wide area and business companies with multiple their assets and facilities in various places, the proposed evaluation method in this study could be a useful approach to implement their risk-based management decisions for tsunami risk. (author)

  1. Judging risk behaviour and risk preference: the role of the evaluative connotation of risk terms.

    NARCIS (Netherlands)

    van Schie, E.C.M.; van der Pligt, J.; van Baaren, K.

    1993-01-01

    Two experiments investigated the impact of the evaluative connotation of risk terms on the judgment of risk behavior and on risk preference. Exp 1 focused on the evaluation congruence of the risk terms with a general risk norm and with Ss' individual risk preference, and its effects on the extremity

  2. Risk evaluation method for faults by engineering approach. (2) Application concept of margin analysis utilizing accident sequences

    International Nuclear Information System (INIS)

    Kamiya, Masanobu; Kanaida, Syuuji; Kamiya, Kouichi; Sato, Kunihiko; Kuroiwa, Katsuya

    2016-01-01

    The influence of the fault displacement on the facility should to be evaluated not only by the activity of the fault but also by obtaining risk information by considering scenarios including such as the frequency and the degree of the hazard, which should be an appropriate approach for nuclear safety. An applicable concept of margin analysis utilizing accident sequences for evaluating the influence of the fault displacement is proposed. By use of this analysis, we can evaluate of the safety functions and margin for core damage, verify the efficiency of equipment of portable type and make a decision to take additional measures to reduce the risk by using obtained risk information. (author)

  3. Food and Drug Administration Evaluation and Cigarette Smoking Risk Perceptions

    Science.gov (United States)

    Kaufman, Annette R.; Waters, Erika A.; Parascandola, Mark; Augustson, Erik M.; Bansal-Travers, Maansi; Hyland, Andrew; Cummings, K. Michael

    2011-01-01

    Objectives: To examine the relationship between a belief about Food and Drug Administration (FDA) safety evaluation of cigarettes and smoking risk perceptions. Methods: A nationally representative, random-digit-dialed telephone survey of 1046 adult current cigarette smokers. Results: Smokers reporting that the FDA does not evaluate cigarettes for…

  4. Safety evaluations required in the safety regulations for Monju and the validity confirmation of safety evaluation methods

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    The purposes of this study are to perform the safety evaluations of the fast breeder reactor 'Monju' and to confirm the validity of the safety evaluation methods. In JFY 2012, the following results were obtained. As for the development of safety evaluation methods needed in the safety examination achieved for the reactor establishment permission, development of the analysis codes, such as a core damage analysis code, were carried out according to the plan. As for the development of the safety evaluation method needed for the risk informed safety regulation, the quantification technique of the event tree using the Continuous Markov chain Monte Carlo method (CMMC method) were studied. (author)

  5. Development and evaluation of a risk communication curriculum for medical students

    NARCIS (Netherlands)

    Han, P.K.; Joekes, K.; Elwyn, G.; Mazor, K.M.; Thomson, R.; Sedgwick, P.; Ibison, J.; Wong, J.B.

    2014-01-01

    OBJECTIVE: To develop, pilot, and evaluate a curriculum for teaching clinical risk communication skills to medical students. METHODS: A new experience-based curriculum, "Risk Talk," was developed and piloted over a 1-year period among students at Tufts University School of Medicine. An experimental

  6. Overview of toxicity data and risk assessment methods for evaluating the chemical effects of depleted uranium compounds

    International Nuclear Information System (INIS)

    Hartmann, H.M.; Monette, F.A.; Avci, H.I.

    2000-01-01

    In the United States, depleted uranium is handled or used in several chemical forms by both governmental agencies and private industry (primarily companies producing and machining depleted uranium metal for military applications). Human exposure can occur as a result of handling these compounds, routine low-level effluent releases to the environment from processing facilities, or materials being accidentally released from storage locations or during processing or transportation. Exposure to uranium can result in both chemical and radiological toxicity, but in most instances chemical toxicity is of greater concern. This article discusses the chemical toxic effects from human exposure to depleted uranium compounds that are likely to be handled during the long-term management and use of depleted uranium hexafluoride (UF 6 ) inventories in the United States. It also reviews representative publications in the toxicological literature to establish appropriate reference values for risk assessments. Methods are described for evaluating chemical toxicity caused by chronic low-level exposure and acute exposure. Example risk evaluations are provided for illustration. Preliminary results indicate that chemical effects of chronic exposure to uranium compounds under normal operating conditions would be negligibly small. Results also show that acute exposures under certain accident conditions could cause adverse chemical effects among the populations exposed.

  7. Evaluation model for safety capacity of chemical industrial park based on acceptable regional risk

    Institute of Scientific and Technical Information of China (English)

    Guohua Chen; Shukun Wang; Xiaoqun Tan

    2015-01-01

    The paper defines the Safety Capacity of Chemical Industrial Park (SCCIP) from the perspective of acceptable regional risk. For the purpose of exploring the evaluation model for the SCCIP, a method based on quantitative risk assessment was adopted for evaluating transport risk and to confirm reasonable safety transport capacity of chemical industrial park, and then by combining with the safety storage capacity, a SCCIP evaluation model was put forward. The SCCIP was decided by the smaller one between the largest safety storage capacity and the maximum safety transport capacity, or else, the regional risk of the park will exceed the acceptable level. The developed method was applied to a chemical industrial park in Guangdong province to obtain the maximum safety transport capacity and the SCCIP. The results can be realized in the regional risk control of the park effectively.

  8. Monumental Masonry Buildings Pre-Assessment Method Based on Risk Assessment

    Directory of Open Access Journals (Sweden)

    Meltem VATAN

    2012-04-01

    Full Text Available Depending on the construction period, geometrical typology, construction and organization of the structure, element size and construction material of historic monumental structures; constructed with bricks, stones, adobe and mortar, are diverse and very complicated. Structural safety is guaranteed by the codes, guidelines, and specifications for recently constructed concrete and steel buildings, but there is no specific criterion for evaluating the historic monumental buildings. This study presents a scoring system method for classifying the risk level of the historic monumental structures based on visual information. This method is based on the acquisition of visual data of the building by using the developed building inspection form, storage of the acquired data on the web database and evaluation of the risk score of the inspected building automatically by the computer database system.

  9. RISK ANALYSIS AND EVALUATION FOR CRITICAL LOGISTICAL INFRASTRUCTURE

    Directory of Open Access Journals (Sweden)

    Sascha Düerkop

    2016-12-01

    Full Text Available Logistical infrastructure builds the backbone of an economy. Without an effective logistical infrastructure in place, the supply for both enterprises and consumers might not be met. But even a high-quality logistical infrastructure can be threatened by risks. Thus, it is important to identify, analyse, and evaluate risks for logistical infrastructure that might threaten logistical processes. Only if those risks are known and their impact estimated, decision makers can implement counteractive measures to reduce risks. In this article, we develop a network-based approach that allows for the evaluation of risks and their consequences onto the logistical network. We will demonstrate the relevance of this approach by applying it to the logistics network of the central German state of Hesse. Even though transport data is extensively tracked and recorded nowadays, typical daily risks, like accidents on a motorway, and extraordinary risks, like a bridge at risk to collapse, terrorist attacks or climate-related catastrophes, are not systematically anticipated. Several studies unveiled recently that the overall impact for an economy of possible failures of single nodes and/or edges in a network are not calculated, and particularly critical edges are not identified in advance. We address this information gap by a method that helps to identify and quantify risks in a given network. To reach this objective, we define a mathematical optimization model that quantifies the current “risk-related costs” of the overall network and quantify the risk by investigating the change of the overall costs in the case a risk is realized.

  10. Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

    OpenAIRE

    O. Badagadze; G. Sirbiladze; I. Khutsishvili

    2014-01-01

    The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

  11. Risk Assessment Method of UHV AC/DC Power System under Serious Disasters

    Directory of Open Access Journals (Sweden)

    Rishang Long

    2016-12-01

    Full Text Available Based on the theory of risk assessment, the risk assessment method for an ultra-high voltage (UHV AC/DC hybrid power system under severe disaster is studied. Firstly, considering the whole process of cascading failure, a fast failure probability calculation method is proposed, and the whole process risk assessment model is established considering the loss of both fault stage and recovery stage based on Monte Carlo method and BPA software. Secondly, the comprehensive evaluation index system is proposed from the aspects of power system structure, fault state and economic loss, and the quantitative assessment of system risk is carried out by an entropy weight model. Finally, the risk assessment of two UHV planning schemes are carried out and compared, which proves the effectiveness of the research work.

  12. Credit Risk Evaluation of Large Power Consumers Considering Power Market Transaction

    Science.gov (United States)

    Fulin, Li; Erfeng, Xu; ke, Sun; Dunnan, Liu; Shuyi, Shen

    2018-03-01

    Large power users will participate in power market in various forms after power system reform. Meanwhile, great importance has always attached to the construction of the credit system in power industry. Due to the difference between the awareness of performance and the ability to perform, credit risk of power customer will emerge accordingly. Therefore, it is critical to evaluate credit risk of large power customers in the new situation of power market. Firstly, this paper constructs index system of credit risk of large power customers, and establishes evaluation model of interval number and AHP-entropy weight method.

  13. Risk-based analysis methods applied to nuclear power plant technical specifications

    International Nuclear Information System (INIS)

    Wagner, D.P.; Minton, L.A.; Gaertner, J.P.

    1989-01-01

    A computer-aided methodology and practical applications of risk-based evaluation of technical specifications are described. The methodology, developed for use by the utility industry, is a part of the overall process of improving nuclear power plant technical specifications. The SOCRATES computer program uses the results of a probabilistic risk assessment or a system-level risk analysis to calculate changes in risk due to changes in the surveillance test interval and/or the allowed outage time stated in the technical specification. The computer program can accommodate various testing strategies (such as staggered or simultaneous testing) to allow modeling of component testing as it is carried out at the plant. The methods and computer program are an integral part of a larger decision process aimed at determining benefits from technical specification changes. These benefits can include cost savings to the utilities by reducing forced shutdowns and decreasing labor requirements for test and maintenance activities, with no adverse impacts on risk. The methodology and the SOCRATES computer program have been used extensively toe valuate several actual technical specifications in case studies demonstrating the methods. Summaries of these applications demonstrate the types of results achieved and the usefulness of the risk-based evaluation in improving the technical specifications

  14. Proposal of risk evaluation methodology for hazardous materials transportation

    International Nuclear Information System (INIS)

    Hartman, Luiz Carlos

    2009-01-01

    The increasing concern with the level of risk associated with the transportation of hazardous materials took some international institutions to pledge efforts in the evaluation of risk in regional level. Following this trend, the objective of this work was to analyze the most recent processes of analysis of risks from road transportation of hazardous materials. In the present work 21 methodologies of analysis of risks, developed by some authors and for diverse localities have been evaluated. Two of them, in special, have been reviewed and discussed: a method recently developed by the Swiss Federal Institute of Technology (Nicolet-Monnier and Gheorghe, 1996) and the strategy delineated by the Center for Chemical Process Safety CCPS (1995), taking into consideration the estimate of the individual and social risk. Also, the models of Harwood et al. (1990) and of Ramos (1997), adapted by Hartman (2003) have been applied to the reality of the roads of the state of Sao Paulo. The extension of these methodologies was explored, in order to find its advantages and disadvantages. As a study case the present work considered the ammonia transportation throughout two routes evaluating the reality of the roads of the state of Sao Paulo, including a significant parcel of evaluation in a densely populated area, getting the results using risk, at least, one of the methodologies mentioned above. The innovation proposed by this work was the research, the development and the introduction of two variables to the model considered by Harwood et al. (1990). These variables that influence in the value of the risk are: the age of the driver of truck and the zone of impact that is function type of product, period of the day where the transport was carried and the volume that has been transported. The aim of the proposed modifications is to let the value of the risk more sensible in relation to the type of the product carried and the age of the truck driver. The main related procedural stages

  15. Statistical methods for evaluating the attainment of cleanup standards

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, R.O.; Simpson, J.C.

    1992-12-01

    This document is the third volume in a series of volumes sponsored by the US Environmental Protection Agency (EPA), Statistical Policy Branch, that provide statistical methods for evaluating the attainment of cleanup Standards at Superfund sites. Volume 1 (USEPA 1989a) provides sampling designs and tests for evaluating attainment of risk-based standards for soils and solid media. Volume 2 (USEPA 1992) provides designs and tests for evaluating attainment of risk-based standards for groundwater. The purpose of this third volume is to provide statistical procedures for designing sampling programs and conducting statistical tests to determine whether pollution parameters in remediated soils and solid media at Superfund sites attain site-specific reference-based standards. This.document is written for individuals who may not have extensive training or experience with statistical methods. The intended audience includes EPA regional remedial project managers, Superfund-site potentially responsible parties, state environmental protection agencies, and contractors for these groups.

  16. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  17. An analytical method of estimating Value-at-Risk on the Belgrade Stock Exchange

    Directory of Open Access Journals (Sweden)

    Obadović Milica D.

    2009-01-01

    Full Text Available This paper presents market risk evaluation for a portfolio consisting of shares that are continuously traded on the Belgrade Stock Exchange, by applying the Value-at-Risk model - the analytical method. It describes the manner of analytical method application and compares the results obtained by implementing this method at different confidence levels. Method verification was carried out on the basis of the failure rate that demonstrated the confidence level for which this method was acceptable in view of the given conditions.

  18. Evaluation of the risks linked with natural refrigerating fluids; Evaluation des risques lies aux fluides frigorigenes naturels

    Energy Technology Data Exchange (ETDEWEB)

    Guilpart, J. [Centre National Machiniste Agricole du Genie Rural des Eaux et des Forets, (Cemagref), 35 - Rennes (France). Div. Genie des Procedes Frigorifiques

    1999-07-01

    Because of their environmental impact, halogenated refrigerants are more and more replaced by `natural` refrigerants in vapor compression cycle refrigerating machineries. However, technological risks exist with these substitution fluids due to their flammability, explosibility or toxicity. Major risks can be encountered at the industrial scale and thanks to experience feedback and to several studies, a rigorous approach was settled and included in the legislative texts relative to classified installations and environment protection. Risks also exist at the scale of refrigerating installations with the use of hydrocarbon and ammonia refrigerants. This paper presents an evaluation of risks both at the industrial and at the installation scale: 1 - definition and approach of industrial risks: scenarios of major industrial accidents (boiling liquid expanding vapor explosion (BLEVE), unconfined vapor cloud explosion (UVCE), toxic gases emission); evaluation of accident effects (thermal, mechanical, noxious); 2 - calculation methods applicable to industrial installations: thermal effects (radiation intensity, exposure duration, mass of flammable product involved in the phenomenon), mechanical effects (TNT equivalent method, rupture of pressurized reservoirs), noxious effects (leaks, atmospheric dispersion); 3 - application to refrigerating installations: case of hydrocarbons (dimensioning scenarios and simplified formulae, admissible scenarios), case of ammonia. (J.S.) 20 refs.

  19. Methods for Risk Analysis

    International Nuclear Information System (INIS)

    Alverbro, Karin

    2010-01-01

    Many decision-making situations today affect humans and the environment. In practice, many such decisions are made without an overall view and prioritise one or other of the two areas. Now and then these two areas of regulation come into conflict, e.g. the best alternative as regards environmental considerations is not always the best from a human safety perspective and vice versa. This report was prepared within a major project with the aim of developing a framework in which both the environmental aspects and the human safety aspects are integrated, and decisions can be made taking both fields into consideration. The safety risks have to be analysed in order to be successfully avoided and one way of doing this is to use different kinds of risk analysis methods. There is an abundance of existing methods to choose from and new methods are constantly being developed. This report describes some of the risk analysis methods currently available for analysing safety and examines the relationships between them. The focus here is mainly on human safety aspects

  20. D & D screening risk evaluation guidance

    Energy Technology Data Exchange (ETDEWEB)

    Robers, S.K.; Golden, K.M.; Wollert, D.A.

    1995-09-01

    The Screening Risk Evaluation (SRE) guidance document is a set of guidelines provided for the uniform implementation of SREs performed on decontamination and decommissioning (D&D) facilities. Although this method has been developed for D&D facilities, it can be used for transition (EM-60) facilities as well. The SRE guidance produces screening risk scores reflecting levels of risk through the use of risk ranking indices. Five types of possible risk are calculated from the SRE: current releases, worker exposures, future releases, physical hazards, and criticality. The Current Release Index (CRI) calculates the current risk to human health and the environment, exterior to the building, from ongoing or probable releases within a one-year time period. The Worker Exposure Index (WEI) calculates the current risk to workers, occupants and visitors inside contaminated D&D facilities due to contaminant exposure. The Future Release Index (FRI) calculates the hypothetical risk of future releases of contaminants, after one year, to human health and the environment. The Physical Hazards Index (PHI) calculates the risks to human health due to factors other than that of contaminants. Criticality is approached as a modifying factor to the entire SRE, due to the fact that criticality issues are strictly regulated under DOE. Screening risk results will be tabulated in matrix form, and Total Risk will be calculated (weighted equation) to produce a score on which to base early action recommendations. Other recommendations from the screening risk scores will be made based either on individual index scores or from reweighted Total Risk calculations. All recommendations based on the SRE will be made based on a combination of screening risk scores, decision drivers, and other considerations, as determined on a project-by-project basis.

  1. Occupational health and safety: Designing and building with MACBETH a value risk-matrix for evaluating health and safety risks

    Science.gov (United States)

    Lopes, D. F.; Oliveira, M. D.; Costa, C. A. Bana e.

    2015-05-01

    Risk matrices (RMs) are commonly used to evaluate health and safety risks. Nonetheless, they violate some theoretical principles that compromise their feasibility and use. This study describes how multiple criteria decision analysis methods have been used to improve the design and the deployment of RMs to evaluate health and safety risks at the Occupational Health and Safety Unit (OHSU) of the Regional Health Administration of Lisbon and Tagus Valley. ‘Value risk-matrices’ (VRMs) are built with the MACBETH approach in four modelling steps: a) structuring risk impacts, involving the construction of descriptors of impact that link risk events with health impacts and are informed by scientific evidence; b) generating a value measurement scale of risk impacts, by applying the MACBETH-Choquet procedure; c) building a system for eliciting subjective probabilities that makes use of a numerical probability scale that was constructed with MACBETH qualitative judgments on likelihood; d) and defining a classification colouring scheme for the VRM. A VRM built with OHSU members was implemented in a decision support system which will be used by OHSU members to evaluate health and safety risks and to identify risk mitigation actions.

  2. Ethical and affective evaluation of environmental risks

    International Nuclear Information System (INIS)

    Bohm, G.; Pfister, H.R.

    1998-01-01

    Full text of publication follows: the present paper will be concerned with environmental risk perception, with special emphasis on those environmental risks that pertain to global change phenomena, such as climate change and ozone depletion. Two determinants of risk judgments are investigated that seem particularly relevant to environmental risks: ethical and affective evaluations. It is assumed that the focus of risk evaluation can be on one of two aspects: a) on an evaluation of potential losses, or b) on ethical considerations. We assume that both, potential loss and violation of ethical principles elicit emotional evaluations, but that these two judgmental aspects are associated with different specific emotions. Following cognitive emotion theories, we distinguish loss-based emotions, such as worry and fear, from ethical emotions, e.g., guilt and anger. A study is presented that investigates the role of ethical and affective evaluations in risk judgments. Various environmental risks were presented to subjects, e.g., air pollution, ozone depletion, climate change and destruction of ecological balance. For each environmental risk, subjects indicated in free-response format as well as on rating scales the extent to which ethical principles were violated, and the intensity of both loss-based and ethical emotions. The correlational structure of the emotion ratings confirms the distinction between loss-based and ethical emotions. Risk judgments co-vary with the strength of ethical evaluation and with the intensity of loss-based emotions, but are independent of ethical emotions. The implications of these findings for the risk appraisal process are discussed. (authors)

  3. Computer-implemented security evaluation methods, security evaluation systems, and articles of manufacture

    Science.gov (United States)

    Muller, George; Perkins, Casey J.; Lancaster, Mary J.; MacDonald, Douglas G.; Clements, Samuel L.; Hutton, William J.; Patrick, Scott W.; Key, Bradley Robert

    2015-07-28

    Computer-implemented security evaluation methods, security evaluation systems, and articles of manufacture are described. According to one aspect, a computer-implemented security evaluation method includes accessing information regarding a physical architecture and a cyber architecture of a facility, building a model of the facility comprising a plurality of physical areas of the physical architecture, a plurality of cyber areas of the cyber architecture, and a plurality of pathways between the physical areas and the cyber areas, identifying a target within the facility, executing the model a plurality of times to simulate a plurality of attacks against the target by an adversary traversing at least one of the areas in the physical domain and at least one of the areas in the cyber domain, and using results of the executing, providing information regarding a security risk of the facility with respect to the target.

  4. Risk Analysis Based on AHP and Fuzzy Comprehensive Evaluation for Maglev Train Bogie

    Directory of Open Access Journals (Sweden)

    Chengxin Fan

    2016-01-01

    Full Text Available The maglev bogie is the key subsystem for maglev train security. To ensure life and property security, it is essential to evaluate its risk level before its operation. In this paper, a combinational method of analytic hierarchy process and fuzzy comprehensive evaluation is proposed to assess hazards in a complex maglev bogie system associated with multiple subsystems’ failures. The very comprehensive identification of risk sources has been done by analyzing the structure of maglev bogie. Furthermore, based on the fuzzy theory, linguistic evaluation set is classified according to risk tolerance. The score of each risk factor is obtained by weighted sum of the result of fuzzy comprehensive evaluation. Our results show that the degree of maglev bogie’s risk is within the range of acceptability. The merits of this work facilitate finding the weak links and determining the maintenance of maglev bogie system.

  5. Evaluation of a novel risk assessment method for self-harm associated with Borderline Personality Disorder.

    Science.gov (United States)

    Rao, Sathya; Broadbear, Jillian H; Thompson, Katherine; Correia, Anna; Preston, Martin; Katz, Paul; Trett, Robert

    2017-10-01

    Borderline personality disorder (BPD) is associated with frequent self-harm and suicidal behaviours. This study compared physician-assessed self-harm risk and intervention choice according to a (i) standard risk assessment and (ii) BPD-specific risk assessment methods. Forty-five junior and senior mental health physicians were assigned to standard or BPD-specific risk training groups. The assessment utilized a BPD case vignette containing four scenarios describing high/low lethality self-harm and chronic/new patterns of self-harm behaviour. Participants chose from among four interventions, each corresponding to a risk category. Standard and BPD-specific groups were alike in their assessment of self-harm risk. Divergence occurred on intervention choice for assessments of low lethality, chronic risk ( pself harm-associated risk, BPD-specific training raised awareness of BPD-appropriate interventions, particularly in the context of chronic patterns of self-harm behaviour. Wider dissemination of BPD-specific risk training may enhance the confidence of mental health clinicians in identifying the nature of self-harm risk as well as the most clinically appropriate interventions for clients with BPD.

  6. A comparison of radiological risk assessment methods for environmental restoration

    International Nuclear Information System (INIS)

    Dunning, D.E. Jr.; Peterson, J.M.

    1993-01-01

    Evaluation of risks to human health from exposure to ionizing radiation at radioactively contaminated sites is an integral part of the decision-making process for determining the need for remediation and selecting remedial actions that may be required. At sites regulated under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a target risk range of 10 -4 to 10 -6 incremental cancer incidence over a lifetime is specified by the US Environmental Protection Agency (EPA) as generally acceptable, based on the reasonable maximum exposure to any individual under current and future land use scenarios. Two primary methods currently being used in conducting radiological risk assessments at CERCLA sites are compared in this analysis. Under the first method, the radiation dose equivalent (i.e., Sv or rem) to the receptors of interest over the appropriate period of exposure is estimated and multiplied by a risk factor (cancer risk/Sv). Alternatively, incremental cancer risk can be estimated by combining the EPA's cancer slope factors (previously termed potency factors) for radionuclides with estimates of radionuclide intake by ingestion and inhalation, as well as radionuclide concentrations in soil that contribute to external dose. The comparison of the two methods has demonstrated that resulting estimates of lifetime incremental cancer risk under these different methods may differ significantly, even when all other exposure assumptions are held constant, with the magnitude of the discrepancy depending upon the dominant radionuclides and exposure pathways for the site. The basis for these discrepancies, the advantages and disadvantages of each method, and the significance of the discrepant results for environmental restoration decisions are presented

  7. Nano-Evaluris: an inhalation and explosion risk evaluation method for nanoparticle use. Part I: description of the methodology

    Science.gov (United States)

    Bouillard, Jacques X.; Vignes, Alexis

    2014-02-01

    In this paper, an inhalation health and explosion safety risk assessment methodology for nanopowders is described. Since toxicological threshold limit values are still unknown for nanosized substances, detailed risk assessment on specific plants may not be carried out. A simple approach based on occupational hazard/exposure band expressed in mass concentrations is proposed for nanopowders. This approach is consolidated with an iso surface toxicological scaling method, which has the merit, although incomplete, to provide concentration threshold levels for which new metrological instruments should be developed for proper air monitoring in order to ensure safety. Whenever the processing or use of nanomaterials is introducing a risk to the worker, a specific nano pictogram is proposed to inform the worker. Examples of risk assessment of process equipment (i.e., containment valves) processing various nanomaterials are provided. Explosion risks related to very reactive nanomaterials such as aluminum nanopowders can be assessed using this new analysis methodology adapted to nanopowders. It is nevertheless found that to formalize and extend this approach, it is absolutely necessary to develop new relevant standard apparatuses and to qualify individual and collective safety barriers with respect to health and explosion risks. In spite of these uncertainties, it appears, as shown in the second paper (Part II) that health and explosion risks, evaluated for given MWCNTs and aluminum nanoparticles, remain manageable in their continuous fabrication mode, considering current individual and collective safety barriers that can be put in place. The authors would, however, underline that peculiar attention must be paid to non-continuous modes of operations, such as process equipment cleaning steps, that are often under-analyzed and are too often forgotten critical steps needing vigilance in order to minimize potential toxic and explosion risks.

  8. A method for calculating effective lifetime risk of radiation-induced cancer from screening mammography

    International Nuclear Information System (INIS)

    Ali, R.M.; England, A.; McEntee, M.F.; Hogg, P.

    2015-01-01

    Purpose: To propose a method for evaluating the effective lifetime risk of radiation-induced cancer from screening mammography and to present initial data for the UK National Breast Screening Programme. Material and methods: The imaging was undertaken using a Hologic Selenia full field digital mammographic unit. The proposed method utilises an ATOM phantom containing thermoluminescent dosimeters and a perspex-polyethylene breast phantom to measure organ doses during a standard four view screening mammogram. Effective dose was calculated and effective risk was modelled for a range of client ages. The total lifetime effective risk was then calculated for the UK national screening programme. Calculation of effective risk includes the radiation dose to examined and contralateral breasts in addition to other body organs; this is an advantage over the mean glandular dose. Results: The contralateral breast, thyroid, thymus, brain, lung, salivary glands, and bone marrow all receive more than 1 μGy radiation dose during screening mammography. A major difference exists for total effective lifetime risk of radiation-induced cancer between clients with average and high breast cancer risk. Differences are attributed to the commencement age of screening and time interval between screens. Conclusion: This study proposes a method to evaluate effective lifetime risk of radiation-induced cancer from screening mammography in order to compare different mammography screening programmes. - Highlights: • We proposed a method for the calculation of radiation-induced cancer from screening mammography. • We measured the radiation absorbed dose of different organs during screening mammography. • There are major differences between mammography screening programme categories with regard to radiation effective risk.

  9. Risk assessment theory, methods, and applications

    CERN Document Server

    Rausand, Marvin

    2011-01-01

    With its balanced coverage of theory and applications along with standards and regulations, Risk Assessment: Theory, Methods, and Applications serves as a comprehensive introduction to the topic. The book serves as a practical guide to current risk analysis and risk assessment, emphasizing the possibility of sudden, major accidents across various areas of practice from machinery and manufacturing processes to nuclear power plants and transportation systems. The author applies a uniform framework to the discussion of each method, setting forth clear objectives and descriptions, while also shedding light on applications, essential resources, and advantages and disadvantages. Following an introduction that provides an overview of risk assessment, the book is organized into two sections that outline key theory, methods, and applications. * Introduction to Risk Assessment defines key concepts and details the steps of a thorough risk assessment along with the necessary quantitative risk measures. Chapters outline...

  10. Geostatistical methods for radiological evaluation and risk analysis of contaminated premises

    International Nuclear Information System (INIS)

    Desnoyers, Y.; Jeannee, N.; Chiles, J.P.; Dubot, D.

    2009-01-01

    Full text: At the end of process equipment dismantling, the complete decontamination of nuclear facilities requires the radiological assessment of residual activity levels of building structures. As stated by the IAEA, 'Segregation and characterization of contaminated materials are the key elements of waste minimization'. From this point of view, the set up of an appropriate evaluation methodology is of primordial importance. The radiological characterization of contaminated premises can be divided into three steps. First, the most exhaustive facility analysis provides historical, functional and qualitative information. Then, a systematic (exhaustive or not) control of the emergent signal is performed by means of in situ measurement methods such as surface control device combined with in situ gamma spectrometry. Besides, in order to assess the contamination depth, samples can be collected from boreholes at several locations within the premises and analyzed. Combined with historical information and emergent signal maps, such data improve and reinforce the preliminary waste zoning. In order to provide reliable estimates while avoiding supplementary investigation costs, there is therefore a crucial need for sampling optimization methods together with appropriate data processing techniques. The relevance of the geostatistical methodology relies on the presence of a spatial continuity for radiological contamination. In this case, geostatistics provides reliable methods for activity estimation, uncertainty quantification and risk analysis, which are essential decision-making tools for decommissioning and dismantling projects of nuclear installations. Besides, the ability of this geostatistical framework to provide answers to several key issues that generally occur during the clean-up preparation phase is discussed: How to optimise the investigation costs? How to deal with data quality issues? How to consistently take into account auxiliary information such as historical

  11. Evaluation of risk effective STIs with specific application to diesels

    International Nuclear Information System (INIS)

    Vesely, W.E.; Samanta, P.K.; Ginzburg, T.

    1987-01-01

    From a risk standpoint, the objective of surveillance tests is to control the risk arising from failures which can occur while the component is on standby. At the same time, risks caused by the test from test-caused failures and test-caused degradations need also to be controlled. Risk-acceptable test intervals balance these risks in an attempt to achieve an acceptable low, overall risk. Risk and reliability approaches are presented which allow risk-acceptable test intervals to be determined for any component. To provide focus for the approaches, diesels are specifically evaluated, however, the approaches can be applied not only to diesels, but to any component with suitable data. Incorporation of the approaches in personal computer (PC) software is discussed, which can provide tools for the regulator or plant personnel for determining acceptable diesel test intervals for any plant specific or generic application. The FRANTIC III computer code was run to validate the approaches and to evaluate specific issues associated with determining risk effective test intervals for diesels. Using the approaches presented, diesel accident unavailability can be more effectively monitored and be controlled on a plant-specific or generic basis. Test intervals can be made more risk effective than they are now, producing more acceptable accident unavailabilities. The methods presented are one step toward performance-based technical specifications, which more directly control risks

  12. Application of risk-based methods to inservice testing of check valves

    Energy Technology Data Exchange (ETDEWEB)

    Closky, N.B.; Balkey, K.R.; McAllister, W.J. [and others

    1996-12-01

    Research efforts have been underway in the American Society of Mechanical Engineers (ASME) and industry to define appropriate methods for the application of risk-based technology in the development of inservice testing (IST) programs for pumps and valves in nuclear steam supply systems. This paper discusses a pilot application of these methods to the inservice testing of check valves in the emergency core cooling system of Georgia Power`s Vogtle nuclear power station. The results of the probabilistic safety assessment (PSA) are used to divide the check valves into risk-significant and less-risk-significant groups. This information is reviewed by a plant expert panel along with the consideration of appropriate deterministic insights to finally categorize the check valves into more safety-significant and less safety-significant component groups. All of the more safety-significant check valves are further evaluated in detail using a failure modes and causes analysis (FMCA) to assist in defining effective IST strategies. A template has been designed to evaluate how effective current and emerging tests for check valves are in detecting failures or in finding significant conditions that are precursors to failure for the likely failure causes. This information is then used to design and evaluate appropriate IST strategies that consider both the test method and frequency. A few of the less safety-significant check valves are also evaluated using this process since differences exist in check valve design, function, and operating conditions. Appropriate test strategies are selected for each check valve that has been evaluated based on safety and cost considerations. Test strategies are inferred from this information for the other check valves based on similar check valve conditions. Sensitivity studies are performed using the PSA model to arrive at an overall IST program that maintains or enhances safety at the lowest achievable cost.

  13. A online credit evaluation method based on AHP and SPA

    Science.gov (United States)

    Xu, Yingtao; Zhang, Ying

    2009-07-01

    Online credit evaluation is the foundation for the establishment of trust and for the management of risk between buyers and sellers in e-commerce. In this paper, a new credit evaluation method based on the analytic hierarchy process (AHP) and the set pair analysis (SPA) is presented to determine the credibility of the electronic commerce participants. It solves some of the drawbacks found in classical credit evaluation methods and broadens the scope of current approaches. Both qualitative and quantitative indicators are considered in the proposed method, then a overall credit score is achieved from the optimal perspective. In the end, a case analysis of China Garment Network is provided for illustrative purposes.

  14. Approaches and methods of risk assessment

    International Nuclear Information System (INIS)

    Rowe, W.D.

    1983-01-01

    The classification system of risk assessment includes the categories: 1) risk comparisons, 2) cost-effectiveness of risk reduction, 3) balancing of costs, risks and benefits against one another, 4. Metasystems. An overview of methods and systems reveals that no single method can be applied to all cases and situations. The visibility of the process and the absolute consideration of all aspects of judging are, however, of first and fore most importance. (DG) [de

  15. Evaluation of passenger health risk assessment of sustainable indoor air quality monitoring in metro systems based on a non-Gaussian dynamic sensor validation method.

    Science.gov (United States)

    Kim, MinJeong; Liu, Hongbin; Kim, Jeong Tai; Yoo, ChangKyoo

    2014-08-15

    Sensor faults in metro systems provide incorrect information to indoor air quality (IAQ) ventilation systems, resulting in the miss-operation of ventilation systems and adverse effects on passenger health. In this study, a new sensor validation method is proposed to (1) detect, identify and repair sensor faults and (2) evaluate the influence of sensor reliability on passenger health risk. To address the dynamic non-Gaussianity problem of IAQ data, dynamic independent component analysis (DICA) is used. To detect and identify sensor faults, the DICA-based squared prediction error and sensor validity index are used, respectively. To restore the faults to normal measurements, a DICA-based iterative reconstruction algorithm is proposed. The comprehensive indoor air-quality index (CIAI) that evaluates the influence of the current IAQ on passenger health is then compared using the faulty and reconstructed IAQ data sets. Experimental results from a metro station showed that the DICA-based method can produce an improved IAQ level in the metro station and reduce passenger health risk since it more accurately validates sensor faults than do conventional methods. Copyright © 2014 Elsevier B.V. All rights reserved.

  16. Methods for risk estimation in nuclear energy

    Energy Technology Data Exchange (ETDEWEB)

    Gauvenet, A [CEA, 75 - Paris (France)

    1979-01-01

    The author presents methods for estimating the different risks related to nuclear energy: immediate or delayed risks, individual or collective risks, risks of accidents and long-term risks. These methods have attained a highly valid level of elaboration and their application to other industrial or human problems is currently under way, especially in English-speaking countries.

  17. Based on Fuzzy Comprehensive Evaluation Method The Investment Risk Assessment of Chinese Enterprises in The Countries Along “The Belt and Road”

    Science.gov (United States)

    Chen, Yanyu; Chai, Huaqi; Huang, Yimiao

    2018-01-01

    “Belt and Road Forum for International Cooperation” held in Beijing in May this year. once again, “The Belt and Road” strategic initiative to the world, causing the world’s enthusiastic response. The core of the “One Belt, One Road” strategy initiative is to promote infrastructure construction and interconnection, dock national policies and development strategies, deepen pragmatic cooperation, promote coordinated and coordinated development and achieve common prosperity. With the “The Belt and Road” strategy in-depth, Chinese enterprises will go abroad, in the countries along the country to invest in more and more examples, accompanied by the increasing risk. Analysis of the failure of investment cases, we can easily find that this is the majority of enterprises overseas investment in the lack of careful assessment of risk and risk of foreign investment risk management has a great relationship. In this paper, the risk factors are used to identify the risk factors table, and the fuzzy comprehensive evaluation method is used to estimate the comprehensive risk value of many uncertain factors that cannot be determined by the overseas investment. The risk assessment system is constructed to help Chinese enterprises to follow the " Investment to avoid risks, improve the success rate.

  18. Comparison study on qualitative and quantitative risk assessment methods for urban natural gas pipeline network.

    Science.gov (United States)

    Han, Z Y; Weng, W G

    2011-05-15

    In this paper, a qualitative and a quantitative risk assessment methods for urban natural gas pipeline network are proposed. The qualitative method is comprised of an index system, which includes a causation index, an inherent risk index, a consequence index and their corresponding weights. The quantitative method consists of a probability assessment, a consequences analysis and a risk evaluation. The outcome of the qualitative method is a qualitative risk value, and for quantitative method the outcomes are individual risk and social risk. In comparison with previous research, the qualitative method proposed in this paper is particularly suitable for urban natural gas pipeline network, and the quantitative method takes different consequences of accidents into consideration, such as toxic gas diffusion, jet flame, fire ball combustion and UVCE. Two sample urban natural gas pipeline networks are used to demonstrate these two methods. It is indicated that both of the two methods can be applied to practical application, and the choice of the methods depends on the actual basic data of the gas pipelines and the precision requirements of risk assessment. Crown Copyright © 2011. Published by Elsevier B.V. All rights reserved.

  19. Evaluation of Total Cardiovascular Risk in Patients with Hypertension and Impaired Glucose Tolerance

    Directory of Open Access Journals (Sweden)

    I.V. Cherniavska

    2016-11-01

    Full Text Available Aim. Timely reveal of the patients at high risk of cardiovascular diseases for whom earlier intervention for cardiovascular risk correction is the most effective. Materials and methods. Seventy patients aged 30–55 years old with stage 2 hypertension, impaired glucose tolerance (IGT and high cardiovascular risk were examined according to Framingham criteria. Cardiovascular risk was compared by SCORE and PROCAM results. Results. Percentage ratio of males with high cardiovascular risk was higher by 52.3 % in comparison to females by SCORE and by 2.3 % in comparison to females by PROCAM. Males did not present any significant discrepancy by evaluation of cardiovascular risk by both scores unlike females. Obtained results showed that total cardiovascular risk in females was twofold higher by PROCAM compared to SCORE scale. Conclusions. Total cardiovascular risk level in patients with stage 2 hypertension and IGT is influenced by age, systolic blood pressure level, smoking, lipid storage disease and carbohydrate metabolism disorder. When we evaluate total cardiovascular risk, we should not be limited only by determination of factors determined in SCORE. It is reasonable to evaluate risk factors by PROCAM, too, especially for females.

  20. Evaluation of Postural Stability and Fall Risk in Patients with Ankylosing Spondylitis

    Directory of Open Access Journals (Sweden)

    Ahmet Inanir

    2013-02-01

    Full Text Available Purpose: The purpose of this study is to evaluate the influences of Ankylosing spondylitis on postural balance and the risk of falls. Methods: A total of 73 sobjects were recruited for the study, including 36 with AS (17 men, 19 women and 37 healthy controls (19 men, 18 women. Patients were evaluated in terms of balance and risk of falls. Balance and risk of falls was assessed with the Biodex Stability System. Results: The mean age, gender and body mass index of the participants did not differ significantly between (p=0.308, p=0.724, p=0.766, respectively. When groups were evaluated in terms of postural stability indexes Overall Stability Index (OSI, Antero-Posteior Stability Index (APSI and Medio-Lateral Stability Index (MLSI had no statistically significant difference (p=0.190, p=0.437 ve p=0.144, respectively. Fall Risk Index (FRI evaluations showed that as patients’ test scores were higher than control group (p=0.001. (Table 1. Conclusions: In this study, we present numerical data that suggests that AS are associated with risk of falling. [Cukurova Med J 2013; 38(1.000: 86-91

  1. [Evaluation and prognosis of occupational risk in workers of nonferrous metallurgy enterprises].

    Science.gov (United States)

    Shliapnikov, D M; Kostarev, V G

    2014-01-01

    The article deals with results of a priori and a posteriori evaluation of occupational risk for workers' health. Categories of a priori occupational risk for workers are estimated as high to very high (intolerable) risk. Findings are that work conditions in nonferrous metallurgy workshop result in upper respiratory tract diseases (medium degree of occupational conditionality). Increased prevalence of such diseases among the workers is connected with length of service. The authors revealed priority factors for occupationally conditioned diseases. A promising approach in occupational medicine is creation of methods to evaluate and forecast occupational risk, that enable to specify goal parameters for prophylactic measures. For example, modelling the risk of occupationally conditioned diseases via changes in exposure to occupational factor and length of service proved that decrease of chemical concentrations in air of workplace to maximally allowable ones lowers risk of respiratory diseases from 14 to 6 cases per year, for length of service of 5 years and population risk.

  2. Regional Risk Evaluation of Flood Disasters for the Trunk-Highway in Shaanxi, China

    Directory of Open Access Journals (Sweden)

    Hong-Liang Qi

    2015-10-01

    Full Text Available Due to the complicated environment there are various types of highway disasters in Shaanxi Province (China. The damages caused are severe, losses are heavy, and have rapidly increased over the years, especially those caused by flood disasters along the rivers in mountainous areas. Therefore, research on risk evaluations, which play important roles in the prevention and mitigation of highway disasters are very important. An evaluation model was established based on the superposition theory of regional influencing factors to highway flood disasters. Based on the formation mechanism and influencing factors of highway flood disasters, the main influencing factors were selected. These factors include rainstorms, terrain slopes, soil types, vegetation coverage and regional river density, which are based on evaluation indexes from climate conditions and underlying surface of the basin. A regional risk evaluation of highway flood disasters in Shaanxi was established using GIS. The risk index was divided into five levels using statistical methods, in accordance with the regional characteristics of highway flood disasters. Considering the difference in upfront investments, road grade, etc, between expressways and trunk-highways in China, a regional risk evaluation of trunk-highway flood disasters was completed. The evaluation results indicate that the risk evaluation is consistent with the actual situation.

  3. Regional Risk Evaluation of Flood Disasters for the Trunk-Highway in Shaanxi, China.

    Science.gov (United States)

    Qi, Hong-Liang; Tian, Wei-Ping; Li, Jia-Chun

    2015-10-29

    Due to the complicated environment there are various types of highway disasters in Shaanxi Province (China). The damages caused are severe, losses are heavy, and have rapidly increased over the years, especially those caused by flood disasters along the rivers in mountainous areas. Therefore, research on risk evaluations, which play important roles in the prevention and mitigation of highway disasters are very important. An evaluation model was established based on the superposition theory of regional influencing factors to highway flood disasters. Based on the formation mechanism and influencing factors of highway flood disasters, the main influencing factors were selected. These factors include rainstorms, terrain slopes, soil types, vegetation coverage and regional river density, which are based on evaluation indexes from climate conditions and underlying surface of the basin. A regional risk evaluation of highway flood disasters in Shaanxi was established using GIS. The risk index was divided into five levels using statistical methods, in accordance with the regional characteristics of highway flood disasters. Considering the difference in upfront investments, road grade, etc, between expressways and trunk-highways in China, a regional risk evaluation of trunk-highway flood disasters was completed. The evaluation results indicate that the risk evaluation is consistent with the actual situation.

  4. A Review on Methods of Risk Adjustment and their Use in Integrated Healthcare Systems

    Science.gov (United States)

    Juhnke, Christin; Bethge, Susanne

    2016-01-01

    Introduction: Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The objective of this review was to obtain an overview of existing models of risk adjustment as well as on crucial weights in risk adjustment. Moreover, the predictive performance of selected methods in international healthcare systems should be analysed. Theory and methods: A comprehensive, systematic literature review on methods of risk adjustment was conducted in terms of an encompassing, interdisciplinary examination of the related disciplines. Results: In general, several distinctions can be made: in terms of risk horizons, in terms of risk factors or in terms of the combination of indicators included. Within these, another differentiation by three levels seems reasonable: methods based on mortality risks, methods based on morbidity risks as well as those based on information on (self-reported) health status. Conclusions and discussion: After the final examination of different methods of risk adjustment it was shown that the methodology used to adjust risks varies. The models differ greatly in terms of their included morbidity indicators. The findings of this review can be used in the evaluation of integrated healthcare delivery systems and can be integrated into quality- and patient-oriented reimbursement of care providers in the design of healthcare contracts. PMID:28316544

  5. A Method of Evaluating Operation of Electric Energy Meter

    Science.gov (United States)

    Chen, Xiangqun; Li, Tianyang; Cao, Fei; Chu, Pengfei; Zhao, Xinwang; Huang, Rui; Liu, Liping; Zhang, Chenglin

    2018-05-01

    The existing electric energy meter rotation maintenance strategy regularly checks the electric energy meter and evaluates the state. It only considers the influence of time factors, neglects the influence of other factors, leads to the inaccuracy of the evaluation, and causes the waste of resources. In order to evaluate the running state of the electric energy meter in time, a method of the operation evaluation of the electric energy meter is proposed. The method is based on extracting the existing data acquisition system, marketing business system and metrology production scheduling platform that affect the state of energy meters, and classified into error stability, operational reliability, potential risks and other factors according to the influencing factors, based on the above basic test score, inspecting score, monitoring score, score of family defect detection. Then, according to the evaluation model according to the scoring, we evaluate electric energy meter operating state, and finally put forward the corresponding maintenance strategy of rotation.

  6. Credit Risk Evaluation : Modeling - Analysis - Management

    OpenAIRE

    Wehrspohn, Uwe

    2002-01-01

    An analysis and further development of the building blocks of modern credit risk management: -Definitions of default -Estimation of default probabilities -Exposures -Recovery Rates -Pricing -Concepts of portfolio dependence -Time horizons for risk calculations -Quantification of portfolio risk -Estimation of risk measures -Portfolio analysis and portfolio improvement -Evaluation and comparison of credit risk models -Analytic portfolio loss distributions The thesis contributes to the evaluatio...

  7. Multi-factor evaluation indicator method for the risk assessment of atmospheric and oceanic hazard group due to the attack of tropical cyclones

    Science.gov (United States)

    Qi, Peng; Du, Mei

    2018-06-01

    China's southeast coastal areas frequently suffer from storm surge due to the attack of tropical cyclones (TCs) every year. Hazards induced by TCs are complex, such as strong wind, huge waves, storm surge, heavy rain, floods, and so on. The atmospheric and oceanic hazards cause serious disasters and substantial economic losses. This paper, from the perspective of hazard group, sets up a multi-factor evaluation method for the risk assessment of TC hazards using historical extreme data of concerned atmospheric and oceanic elements. Based on the natural hazard dynamic process, the multi-factor indicator system is composed of nine natural hazard factors representing intensity and frequency, respectively. Contributing to the indicator system, in order of importance, are maximum wind speed by TCs, attack frequency of TCs, maximum surge height, maximum wave height, frequency of gusts ≥ Scale 8, rainstorm intensity, maximum tidal range, rainstorm frequency, then sea-level rising rate. The first four factors are the most important, whose weights exceed 10% in the indicator system. With normalization processing, all the single-hazard factors are superposed by multiplying their weights to generate a superposed TC hazard. The multi-factor evaluation indicator method was applied to the risk assessment of typhoon-induced atmospheric and oceanic hazard group in typhoon-prone southeast coastal cities of China.

  8. [Development of HIV infection risk assessment tool for men who have sex with men based on Delphi method].

    Science.gov (United States)

    Li, L L; Jiang, Z; Song, W L; Ding, Y Y; Xu, J; He, N

    2017-10-10

    Objective: To develop a HIV infection risk assessment tool for men who have sex with men (MSM) based on Delphi method. Methods: After an exhaustive literature review, we used Delphi method to determine the specific items and relative risk scores of the assessment tool through two rounds of specialist consultation and overall consideration of the opinions and suggestions of 17 specialists. Results: The positivity coefficient through first and second round specialist consultation was 100.0 % and 94.1 % , respectively. The mean of authority coefficients ( Cr ) was 0.86. Kendall's W coefficient of the specialist consultation was 0.55 for the first round consultation (χ(2)=84.426, P risk assessment tool for MSM has 8 items. Conclusions: The HIV infection risk assessment tool for MSM, developed under the Delphi method, can be used in the evaluation of HIV infection risk in MSM and individualized prevention and intervention. However, the reliability and validity of this risk assessment tool need to be further evaluated.

  9. Skin sensitisation: the Colipa strategy for developing and evaluating non-animal test methods for risk assessment.

    Science.gov (United States)

    Maxwell, Gavin; Aeby, Pierre; Ashikaga, Takao; Bessou-Touya, Sandrine; Diembeck, Walter; Gerberick, Frank; Kern, Petra; Marrec-Fairley, Monique; Ovigne, Jean-Marc; Sakaguchi, Hitoshi; Schroeder, Klaus; Tailhardat, Magali; Teissier, Silvia; Winkler, Petra

    2011-01-01

    Allergic contact dermatitis is a delayed-type hypersensitivity reaction induced by small reactive chemicals (haptens). Currently, the sensitising potential and potency of new chemicals is usually characterised using data generated via animal studies, such as the local lymph node assay (LLNA). There are, however, increasing public and political concerns regarding the use of animals for the testing of new chemicals. Consequently, the development of in vitro, in chemico or in silico models for predicting the sensitising potential and/or potency of new chemicals is receiving widespread interest. The Colipa Skin Tolerance task force currently collaborates with and/or funds several academic research groups to expand our understanding of the molecular and cellular events occurring during the acquisition of skin sensitisation. Knowledge gained from this research is being used to support the development and evaluation of novel alternative approaches for the identification and characterisation of skin sensitizing chemicals. At present three non-animal test methods (Direct Peptide Reactivity Assay (DPRA), Myeloid U937 Skin Sensitisation Test (MUSST) and human Cell Line Activation Test (hCLAT)) have been evaluated in Colipa interlaboratory ring trials for their potential to predict skin sensitisation potential and were recently submitted to ECVAM for formal pre-validation. Data from all three test methods will now be used to support the study and development of testing strategy approaches for skin sensitiser potency prediction. This publication represents the current viewpoint of the cosmetics industry on the feasibility of replacing the need for animal test data for informing skin sensitisation risk assessment decisions.

  10. Evaluating Risk Communication After the Fukushima Disaster Based on Nudge Theory.

    Science.gov (United States)

    Murakami, Michio; Tsubokura, Masaharu

    2017-03-01

    Using nudge theory and some examples of risk communication that followed the Fukushima disaster, this article discusses the influences and justifications of risk communication, in addition to how risk communication systems are designed. To assist people in making decisions based on their own value systems, we provide three suggestions, keeping in mind that people can be influenced (ie, "nudged") depending on how risk communication takes place: (1) accumulate knowledge on the process of evaluating how the method of risk communication and a system's default design could impact people; (2) clarify the purpose and outcomes of risk communication; and (3) see what risk communication might be ethically unjustifiable. Quantitative studies on risk communication and collective narratives will provide some ideas for how to design better risk communication systems and to help people make decisions. Furthermore, we have shown examples of unjustifiable risk communication.

  11. Risk Analysis Based on AHP and Fuzzy Comprehensive Evaluation for Maglev Train Bogie

    OpenAIRE

    Fan, Chengxin; Dou, Fengshan; Tong, Baiming; Long, Zhiqiang

    2016-01-01

    The maglev bogie is the key subsystem for maglev train security. To ensure life and property security, it is essential to evaluate its risk level before its operation. In this paper, a combinational method of analytic hierarchy process and fuzzy comprehensive evaluation is proposed to assess hazards in a complex maglev bogie system associated with multiple subsystems’ failures. The very comprehensive identification of risk sources has been done by analyzing the structure of maglev bogie. Furt...

  12. D ampersand D screening risk evaluation guidance

    International Nuclear Information System (INIS)

    Robers, S.K.; Golden, K.M.; Wollert, D.A.

    1995-09-01

    The Screening Risk Evaluation (SRE) guidance document is a set of guidelines provided for the uniform implementation of SREs performed on decontamination and decommissioning (D ampersand D) facilities. Although this method has been developed for D ampersand D facilities, it can be used for transition (EM-60) facilities as well. The SRE guidance produces screening risk scores reflecting levels of risk through the use of risk ranking indices. Five types of possible risk are calculated from the SRE: current releases, worker exposures, future releases, physical hazards, and criticality. The Current Release Index (CRI) calculates the current risk to human health and the environment, exterior to the building, from ongoing or probable releases within a one-year time period. The Worker Exposure Index (WEI) calculates the current risk to workers, occupants and visitors inside contaminated D ampersand D facilities due to contaminant exposure. The Future Release Index (FRI) calculates the hypothetical risk of future releases of contaminants, after one year, to human health and the environment. The Physical Hazards Index (PHI) calculates the risks to human health due to factors other than that of contaminants. Criticality is approached as a modifying factor to the entire SRE, due to the fact that criticality issues are strictly regulated under DOE. Screening risk results will be tabulated in matrix form, and Total Risk will be calculated (weighted equation) to produce a score on which to base early action recommendations. Other recommendations from the screening risk scores will be made based either on individual index scores or from reweighted Total Risk calculations. All recommendations based on the SRE will be made based on a combination of screening risk scores, decision drivers, and other considerations, as determined on a project-by-project basis

  13. Experimental approaches for evaluating the invasion risk of biofuel crops

    International Nuclear Information System (INIS)

    Luke Flory, S; Sollenberger, Lynn E; Lorentz, Kimberly A; Gordon, Doria R

    2012-01-01

    There is growing concern that non-native plants cultivated for bioenergy production might escape and result in harmful invasions in natural areas. Literature-derived assessment tools used to evaluate invasion risk are beneficial for screening, but cannot be used to assess novel cultivars or genotypes. Experimental approaches are needed to help quantify invasion risk but protocols for such tools are lacking. We review current methods for evaluating invasion risk and make recommendations for incremental tests from small-scale experiments to widespread, controlled introductions. First, local experiments should be performed to identify conditions that are favorable for germination, survival, and growth of candidate biofuel crops. Subsequently, experimental introductions in semi-natural areas can be used to assess factors important for establishment and performance such as disturbance, founder population size, and timing of introduction across variable habitats. Finally, to fully characterize invasion risk, experimental introductions should be conducted across the expected geographic range of cultivation over multiple years. Any field-based testing should be accompanied by safeguards and monitoring for early detection of spread. Despite the costs of conducting experimental tests of invasion risk, empirical screening will greatly improve our ability to determine if the benefits of a proposed biofuel species outweigh the projected risks of invasions. (letter)

  14. The risk-benefit task of research ethics committees: An evaluation of current approaches and the need to incorporate decision studies methods

    Directory of Open Access Journals (Sweden)

    Bernabe Rosemarie D L C

    2012-04-01

    Full Text Available Abstract Background Research ethics committees (RECs are tasked to assess the risks and the benefits of a trial. Currently, two procedure-level approaches are predominant, the Net Risk Test and the Component Analysis. Discussion By looking at decision studies, we see that both procedure-level approaches conflate the various risk-benefit tasks, i.e., risk-benefit assessment, risk-benefit evaluation, risk treatment, and decision making. This conflation makes the RECs’ risk-benefit task confusing, if not impossible. We further realize that RECs are not meant to do all the risk-benefit tasks; instead, RECs are meant to evaluate risks and benefits, appraise risk treatment suggestions, and make the final decision. Conclusion As such, research ethics would benefit from looking beyond the procedure-level approaches and allowing disciplines like decision studies to be involved in the discourse on RECs’ risk-benefit task.

  15. Cyber Security Risk Evaluation of a Nuclear I&C Using BN and ET

    Directory of Open Access Journals (Sweden)

    Jinsoo Shin

    2017-04-01

    Full Text Available Cyber security is an important issue in the field of nuclear engineering because nuclear facilities use digital equipment and digital systems that can lead to serious hazards in the event of an accident. Regulatory agencies worldwide have announced guidelines for cyber security related to nuclear issues, including U.S. NRC Regulatory Guide 5.71. It is important to evaluate cyber security risk in accordance with these regulatory guides. In this study, we propose a cyber security risk evaluation model for nuclear instrumentation and control systems using a Bayesian network and event trees. As it is difficult to perform penetration tests on the systems, the evaluation model can inform research on cyber threats to cyber security systems for nuclear facilities through the use of prior and posterior information and backpropagation calculations. Furthermore, we suggest a methodology for the application of analytical results from the Bayesian network model to an event tree model, which is a probabilistic safety assessment method. The proposed method will provide insight into safety and cyber security risks.

  16. The concept of attributes and preventions of the variables that influence the pipeline risk in the Muhlbauer Method

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, Alexandro G. [Universidade Federal do Pampa (UNIPAMPA), Bage, RS (Brazil)

    2009-07-01

    There are several methods for the risk assessment and risk management applied to pipelines, among them the Muhlbauer's Method. Muhlbauer is an internationally recognized authority on pipeline risk management. The purpose of this model is to evaluate the public exposure to the risk and identify ways for management that risk in fact. The assessment is made by the attribution of quantitative values to the several items that influences in the pipeline risk. Because the ultimate goal of the risk assessment is to provide a means of risk management, it is sometimes useful to make a distinction between two types of risk variables. The risk evaluator can categorize each index risk variable as either an attribute or a prevention. This paper approaches the subject of the definition of attributes and preventions in the Muhlbauer basic model of risk assessment and also presents a classification of the variables that influence the risk in agreement with those two categories. (author)

  17. A Hybrid Approach for Evaluating Faulty Behavior Risk of High-Risk Operations Using ANP and Evidence Theory

    Directory of Open Access Journals (Sweden)

    Xia-Zhong Zheng

    2017-01-01

    Full Text Available Hydropower project construction is a high-risk operation, where accidents occur frequently. Moreover, the factors leading to accidents are often human factors, so safety evaluation of these factors for the hydropower projects’ work system is very significant. The Human Factors Analysis and Classification System (HFACS framework is applied to build evaluation system. In the evaluation process, correlation analysis is used to form the intercriteria analysis matrix that helps the decision makers to build impact relation matrix. Factor weights are calculated by the Analytic Network Process (ANP. In the index value determination step, the evidence theory is used to eliminate the conflicts of three decision makers and the index values are then calculated. The faulty behavior risk (FBR assessment value is finally obtained. The proposed method is practical and its applicability is proved by an example.

  18. Risk evaluation for structures

    International Nuclear Information System (INIS)

    Freudenthal, A.M.; Schueller, G.I.

    1976-01-01

    The basic principles of the risk analysis, which is based on classical statistics is discussed. The significance of the Asymptotic (Extreme Value) distributions as well as the method of basing the level of acceptable risk on economical optimization procedures is pointed out. The application of the risk analysis to special type structures such as fixed offshore platforms, television towers, reactor containments and the reliability of reactor components under creep and fatigue load is elaborated by carrying out numerical examples. (orig./HP) [de

  19. Fire Risk in MTBF Evaluation for UPS System

    Directory of Open Access Journals (Sweden)

    Stefano Elia

    2016-01-01

    Full Text Available The reliability improvement of no-break redundant electrical systems is the first aim of the proposed strategy. The failure of some UPS (Uninterruptible Power Supply system may lead to the fire occurrence. The most used electrical configurations are presented and discussed in the paper. The innovation of the proposed method consists of taking into account the fire risk to improve the accuracy of wiring configuration and component’s failure rate. Thorough research on MTBF (Mean Time Between Failure data has been performed for each wiring component and UPS. The fire risk is taken into account introducing an equivalent fire block in the Reliability Block Diagram scheme; it has an MTBF value calculated form yearly statistics of UPS fire events. The reliability of the most used UPS electrical configurations is evaluated by means of the RBD method. Different electrical systems have been investigated and compared based on MTBF. The importance of fire compartmentation between two or more UPS’ connected in parallel is proved here.

  20. A Bayesian approach to the evaluation of risk-based microbiological criteria for Campylobacter in broiler meat

    DEFF Research Database (Denmark)

    Ranta, Jukka; Lindqvist, Roland; Hansson, Ingrid

    2015-01-01

    Shifting from traditional hazard-based food safety management toward risk-based management requires statistical methods for evaluating intermediate targets in food production, such as microbiological criteria (MC), in terms of their effects on human risk of illness. A fully risk-based evaluation...... of MC involves several uncertainties that are related to both the underlying Quantitative Microbiological Risk Assessment (QMRA) model and the production-specific sample data on the prevalence and concentrations of microbes in production batches. We used Bayesian modeling for statistical inference...

  1. Evaluation of Contamination Inspection and Analysis Methods through Modeling System Performance

    Science.gov (United States)

    Seasly, Elaine; Dever, Jason; Stuban, Steven M. F.

    2016-01-01

    Contamination is usually identified as a risk on the risk register for sensitive space systems hardware. Despite detailed, time-consuming, and costly contamination control efforts during assembly, integration, and test of space systems, contaminants are still found during visual inspections of hardware. Improved methods are needed to gather information during systems integration to catch potential contamination issues earlier and manage contamination risks better. This research explores evaluation of contamination inspection and analysis methods to determine optical system sensitivity to minimum detectable molecular contamination levels based on IEST-STD-CC1246E non-volatile residue (NVR) cleanliness levels. Potential future degradation of the system is modeled given chosen modules representative of optical elements in an optical system, minimum detectable molecular contamination levels for a chosen inspection and analysis method, and determining the effect of contamination on the system. By modeling system performance based on when molecular contamination is detected during systems integration and at what cleanliness level, the decision maker can perform trades amongst different inspection and analysis methods and determine if a planned method is adequate to meet system requirements and manage contamination risk.

  2. Methods of Financial Risk Management

    Directory of Open Access Journals (Sweden)

    Korzh Natalia

    2016-10-01

    Full Text Available The essence and nature of financial risks are investigated. Their classification is conducted. The features of financial risk management and the main methods of management are considered. The ways of risk compensation are identified. It is proved that the objective external risk basis is such market imperfections as externalities of enterprises and incomplete information about the operation of the business environment and internal objective basis risk – the objective function to maximise profits in a competitive environment. It is revealed that to compensate market imperfections business entities should develop a strategy that combines fill in missing information and neutralise or minimise externalities that tactically implemented in financial risk management programs.

  3. Use of the event tree method for evaluate the safety of radioactive facilities

    International Nuclear Information System (INIS)

    Hernandez S, A.; Cornejo D, N.; Callis F, E.

    2006-01-01

    The work shows the validity of the use of Trees of Events like a quantitative method appropriate to carry out evaluations of radiological safety. Its were took like base the evaluations of safety of five Radiotherapy Departments, carried out in the mark of the process of authorization of these facilities. The risk values were obtained by means of the combination of the probabilities of occurrence of the events with its consequences. The use of the method allowed to suggest improvements to the existent safety systems, as well as to confirm that the current regulator requirements for this type of facilities to lead to practices with acceptable risk levels. (Author)

  4. Business risks, functions, methods of assessment and ways to reduce risk

    Directory of Open Access Journals (Sweden)

    A.V. Mihalchuk

    2015-06-01

    Full Text Available For successful existence in a market economy entrepreneur have to take bold actions, and this increases the risk. The article describes the concept of entrepreneurship and business risk, positive and negative aspects of functions of risk in business. Therefore, it is necessary to assess the risk properly and be able to manage it to achieve the most effective results in the market. In market conditions the problem of assessing and accounting market becomes independent theoretical and practical significance as an important component of the theory and practice of management. Risk - a key element of business activities. Development of risk situations can lead to both the occurrence of adverse effects (losses, lost profits, and positive results for a company in the form of increased profit. This article describes: the concept of entrepreneurship, risk and business risks, characteristic of positive and negative aspects of risk functions in business, methods of assessment and risk reduction, shows formulae and examples you can use to assess risk in an enterprise. Analyzing already established methods of risk assessment a number of rules were proposed in order to reduce business risk.

  5. SPECIFIC METHOD OF RISK ASSESSMENT IN TOURISM ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Andreea ARMEAN

    2014-12-01

    Full Text Available The objective of this paper is to present an innovative method of risk assessment for tourism businesses. The contribution to literature is the novelty of this method of following paths: is an ante-factum assessment not post-factum; risk assessment is based on perception rather than results; is based on specific risks tourism enterprises not on the overall risks. Is an asset-research methodology and consists in generating its own method of risk assessment based on the ideas summarized from the literature studied. The aim established is tourism enterprises from Romania. The data necessary for the application of this method will result from applying to top level management of tourism enterprises, a questionnaire about risk perception. The results from this study will help identify and measure the risks specific to tourism enterprises. The applicability of the results is to improve risk management in these enterprises.

  6. A Study on the Estimation Method of Risk Based Area for Jetty Safety Monitoring

    Directory of Open Access Journals (Sweden)

    Byeong-Wook Nam

    2015-09-01

    Full Text Available Recently, the importance of safety-monitoring systems was highlighted by the unprecedented collision between a ship and a jetty in Yeosu. Accordingly, in this study, we introduce the concept of risk based area and develop a methodology for a jetty safety-monitoring system. By calculating the risk based areas for a ship and a jetty, the risk of collision was evaluated. To calculate the risk based areas, we employed an automatic identification system for the ship, stopping-distance equations, and the regulation velocity near the jetty. In this paper, we suggest a risk calculation method for jetty safety monitoring that can determine the collision probability in real time and predict collisions using the amount of overlap between the two calculated risk based areas. A test was conducted at a jetty control center at GS Caltex, and the effectiveness of the proposed risk calculation method was verified. The method is currently applied to the jetty-monitoring system at GS Caltex in Yeosu for the prevention of collisions.

  7. Use of the Immunegenetical Methods for Biological Risks Evaluation

    International Nuclear Information System (INIS)

    Pozdnyakova, L.; Stopchanskaya, A.; Parkhomenko, N.; Pilipenko, N.; Kostyuchenko, L.; Djurtubaeva, G.; Slavina, N.; Pozdnyakov, S.

    2007-01-01

    For the present biological risk evaluation and forecast, information on gene-phenotypic characteristics of circulating regional EDAs, their connatural sources and conditions for epidemic distribution is necessary. We lead a relative gene-phenotypic comparison of vaccine and wild F.tularensis strains isolated from carriers, vectors, environment and patients in the different natural foci. Phenotyping investigations were done on 'in vitro' model with use of the human peripheral blood immune competent cells (ICC) of non-vaccinated and vaccinated with LVS volunteers. Variations of virulence manifestations of F.tularensis strains, isolated from different sources (ticks, waters, patients) are revealed. Principal differences in interactions of ICC with strains of various virulence degree, presence of ICC structural-functional changes in cytokines secretion dynamics at the presence of the wild and vaccine strains are shown. Morphological proofs for toxic materials production by pathogen during reproductive development term, damaging membranes structure, nucleus and cytoplasm are received. Certain interrelations between isolates phenotypic characteristics, source of isolation and types of natural foci is revealed. VNTR-analysis has showed genotypical heterogeneity and specific peculiarities in VNTR locuses combination of F. tularensis strains from different sources. Biological sense of VNTR-locuses combinations variations and their influence upon virulence signs expression are discussed. The complex approach, including agent's gene-phenotypic characteristics, ecological and geographical features of the natural foci, level of the human recruitment into the epidemic process will promote development of measures for counteraction in case of agents and their modified variants deliberate use. (author)

  8. Screening Risk Evaluation methodology

    International Nuclear Information System (INIS)

    Hopper, K.M.

    1994-01-01

    The Screening Risk Evaluation (SRE) Guidance document is a set of guidelines provided for the uniform implementation of SREs performed on D ampersand D facilities. These guidelines are designed specifically for the completion of the second (semi-quantitative screening) phase of the D ampersand D Risk-Based Process. The SRE Guidance produces screening risk scores reflecting levels of risk through the use of risk ranking indices. Five types of possible risk are calculated from the SRE: current releases, worker exposures, future releases, physical hazards, and criticality. The Current Release Index (CRI) calculates the risk to human health and the environment from ongoing or probable releases within a one year time period. The Worker Exposure Index (WEI) calculates the risk to workers, occupants, and visitors in D ampersand D facilities of contaminant exposure. The Future Release Index (FRI) calculates the risk of future releases of contaminants, after one year, to human health and the environment. The Physical Hazards Index (PHI) calculates the risk-to human health due to factors other than that of contaminants. The index of Criticality is approached as a modifying factor to the entire SRE, due to the fact that criticality issues are strictly regulated under DOE. Screening risk results will be tabulated in matrix form and Total Risk will be calculated (weighted equation) to produce a score on which to base early action recommendations. Other recommendations from the screening risk scores will be made based either on individual index scores or from reweighted Total Risk calculations. All recommendations based on the SRE will be made based on a combination of screening risk scores, decision drivers, and other considerations, determined on a project by project basis. The SRE is the first and most important step in the overall D ampersand D project level decision making process

  9. A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels

    Science.gov (United States)

    Liu, Guo-Feng; Feng, Xia-Ting; Feng, Guang-Liang; Chen, Bing-Rui; Chen, Dong-Fang; Duan, Shu-Qian

    2016-08-01

    Focusing on the problems caused by rockburst hazards in deep tunnels, such as casualties, damage to construction equipment and facilities, construction schedule delays, and project cost increase, this research attempts to present a methodology for dynamic risk assessment and management of rockbursts in D&B tunnels. The basic idea of dynamic risk assessment and management of rockbursts is determined, and methods associated with each step in the rockburst risk assessment and management process are given, respectively. Among them, the main parts include a microseismic method for early warning the occurrence probability of rockburst risk, an estimation method that aims to assess potential consequences of rockburst risk, an evaluation method that utilizes a new quantitative index considering both occurrence probability and consequences for determining the level of rockburst risk, and the dynamic updating. Specifically, this research briefly describes the referenced microseismic method of warning rockburst, but focuses on the analysis of consequences and associated risk assessment and management of rockburst. Using the proposed method of risk assessment and management of rockburst, the occurrence probability, potential consequences, and the level of rockburst risk can be obtained in real-time during tunnel excavation, which contributes to the dynamic optimisation of risk mitigation measures and their application. The applicability of the proposed method has been verified by those cases from the Jinping II deep headrace and water drainage tunnels at depths of 1900-2525 m (with a length of 11.6 km in total for D&B tunnels).

  10. Chemical mixtures: Evaluation of risk for child-specific exposures in a multi-stressor environment

    International Nuclear Information System (INIS)

    Pohl, H.R.; Abadin, H.G.

    2008-01-01

    Evaluating the health impact from exposure to chemical mixtures is multifaceted. One component is exposure. Exposure, and consequently risk assessment for mixtures and chemicals in general, are often viewed in terms of a given exposure to a given population at a given location over a given time period. However, environmental exposures are present throughout human lifetime. As a result, an evaluation of risk must include the distinctive characteristics related to chemical exposures which will impact risk depending upon the particular life stage where exposure occurs. Risks to offspring may be associated with unique exposures in utero, during infancy, childhood, or adolescent periods. For example, exposure of infants to anthropogenic chemicals via breast milk may be of concern. The Agency for Toxic Substances and Disease Registry's (ATSDR's) approach to evaluating risks associated with exposure to mixtures of chemicals is presented. In addition to the breast milk issues, indoor exposure to combined air pollutants, drinking water contaminants, and soil and dust contaminants are discussed. The difference between a mixture's risk evaluation for children and adults is in the distinct exposure scenarios resulting from variations in behavior, physiology, and/or pharmacokinetics between adults and children rather than in the method for the specific mixtures evaluation per se

  11. Risk-based methods for reliability investments in electric power distribution systems

    Energy Technology Data Exchange (ETDEWEB)

    Alvehag, Karin

    2011-07-01

    Society relies more and more on a continuous supply of electricity. However, while under investments in reliability lead to an unacceptable number of power interruptions, over investments result in too high costs for society. To give incentives for a socio economically optimal level of reliability, quality regulations have been adopted in many European countries. These quality regulations imply new financial risks for the distribution system operator (DSO) since poor reliability can reduce the allowed revenue for the DSO and compensation may have to be paid to affected customers. This thesis develops a method for evaluating the incentives for reliability investments implied by different quality regulation designs. The method can be used to investigate whether socio economically beneficial projects are also beneficial for a profit-maximizing DSO subject to a particular quality regulation design. To investigate which reinvestment projects are preferable for society and a DSO, risk-based methods are developed. With these methods, the probability of power interruptions and the consequences of these can be simulated. The consequences of interruptions for the DSO will to a large extent depend on the quality regulation. The consequences for the customers, and hence also society, will depend on factors such as the interruption duration and time of occurrence. The proposed risk-based methods consider extreme outage events in the risk assessments by incorporating the impact of severe weather, estimating the full probability distribution of the total reliability cost, and formulating a risk-averse strategy. Results from case studies performed show that quality regulation design has a significant impact on reinvestment project profitability for a DSO. In order to adequately capture the financial risk that the DSO is exposed to, detailed riskbased methods, such as the ones developed in this thesis, are needed. Furthermore, when making investment decisions, a risk

  12. Evaluation of biologic occupational risk control practices: quality indicators development and validation.

    Science.gov (United States)

    Takahashi, Renata Ferreira; Gryschek, Anna Luíza F P L; Izumi Nichiata, Lúcia Yasuko; Lacerda, Rúbia Aparecida; Ciosak, Suely Itsuko; Gir, Elucir; Padoveze, Maria Clara

    2010-05-01

    There is growing demand for the adoption of qualification systems for health care practices. This study is aimed at describing the development and validation of indicators for evaluation of biologic occupational risk control programs. The study involved 3 stages: (1) setting up a research team, (2) development of indicators, and (3) validation of the indicators by a team of specialists recruited to validate each attribute of the developed indicators. The content validation method was used for the validation, and a psychometric scale was developed for the specialists' assessment. A consensus technique was used, and every attribute that obtained a Content Validity Index of at least 0.75 was approved. Eight indicators were developed for the evaluation of the biologic occupational risk prevention program, with emphasis on accidents caused by sharp instruments and occupational tuberculosis prevention. The indicators included evaluation of the structure, process, and results at the prevention and biologic risk control levels. The majority of indicators achieved a favorable consensus regarding all validated attributes. The developed indicators were considered validated, and the method used for construction and validation proved to be effective. Copyright (c) 2010 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  13. Teleophthalmology for First Nations Clients at Risk of Diabetic Retinopathy: A Mixed Methods Evaluation

    Science.gov (United States)

    Driver, D Dean

    2015-01-01

    Background Access to health services is a particular challenge for First Nations (aboriginal Canadians) communities living in remote or underserviced areas. Teleophthalmology can provide them with the same level of retinal screening services provided to those in urban centers. This screening can lead to the identification of high-risk individuals who can then be monitored and receive treatment related to their diabetes or other health issues. Objective The intent was to develop, implement, and evaluate a service delivery model for teleophthalmology screening and follow-up for at-risk and diabetic First Nations clients on Vancouver Island, British Columbia, Canada. Methods A highly consultative, culturally appropriate, and collaborative approach was used to develop and deploy a teleophthalmology service delivery model to First Nations communities. This project was evaluated with regard to utilization and operational costs. Also, clinicians and team members involved in the teleophthalmology project provided assessments of the teleopthalmology quality, productivity, and access. Health providers in First Nations communities provided their perceptions of areas of improvement for the remote retinal screening services, areas where expansion of services could be offered, and opportunities to increase client education and health promotion. Results All 51 First Nations communities on Vancouver Island expressed interest in receiving teleopthalmology services. During the 1-year project, teleopthalmology clinics were held in 43 of 51 communities on Vancouver Island. During these clinics, 524 clients were screened and 140 of those clients were referred to a general ophthalmologist, family doctor, retinal specialist, optometrist, or other provider. Ratings of teleopthalmology system quality, information quality, service quality, and system usage were positive. Satisfaction with the teleopthalmology project was high among clinicians involved with the project. Satisfaction was also

  14. Application of the Bow Tie method for evaluation of safety in the procedure of logging wells

    International Nuclear Information System (INIS)

    Alfonso Pallares, C; Perez Reyes, Y.; Sarabia Molina, I.I.

    2013-01-01

    This work consists of an assessment of security in the practice of logging of oil wells, using the method of Bow Tie for being a simple method of evaluation of the risk, which makes it possible in a structured way to set priorities to manage risk

  15. At-Risk Youth Appearance and Job Performance Evaluation

    Science.gov (United States)

    Freeburg, Beth Winfrey; Workman, Jane E.

    2008-01-01

    The goal of this study was to identify the relationship of at-risk youth workplace appearance to other job performance criteria. Employers (n = 30; each employing from 1 to 17 youths) evaluated 178 at-risk high school youths who completed a paid summer employment experience. Appearance evaluations were significantly correlated with evaluations of…

  16. Noninvasive non Doses Method for Risk Stratification of Breast Diseases

    Directory of Open Access Journals (Sweden)

    I. A. Apollonova

    2014-01-01

    developed technique for the risk stratification.Therefore, the conducted research allows us to conclude that the proposed method to assess the risk group of mammary gland disorders is informative and prospective.The evaluated method of the iridoglyphical research allows us to evaluate the microcirculation dysfunctions in iris’ zones that are neurotrophically linked with vegetative centres of the spinal cord. Thus, the use of iridoglyphical research increases the general sensitivity of the diagnostic process.

  17. Nature Disaster Risk Evaluation with a Group Decision Making Method Based on Incomplete Hesitant Fuzzy Linguistic Preference Relations

    Directory of Open Access Journals (Sweden)

    Ming Tang

    2018-04-01

    Full Text Available Because the natural disaster system is a very comprehensive and large system, the disaster reduction scheme must rely on risk analysis. Experts’ knowledge and experiences play a critical role in disaster risk assessment. The hesitant fuzzy linguistic preference relation is an effective tool to express experts’ preference information when comparing pairwise alternatives. Owing to the lack of knowledge or a heavy workload, information may be missed in the hesitant fuzzy linguistic preference relation. Thus, an incomplete hesitant fuzzy linguistic preference relation is constructed. In this paper, we firstly discuss some properties of the additive consistent hesitant fuzzy linguistic preference relation. Next, the incomplete hesitant fuzzy linguistic preference relation, the normalized hesitant fuzzy linguistic preference relation, and the acceptable hesitant fuzzy linguistic preference relation are defined. Afterwards, three procedures to estimate the missing information are proposed. The first one deals with the situation in which there are only n − 1 known judgments involving all the alternatives; the second one is used to estimate the missing information of the hesitant fuzzy linguistic preference relation with more known judgments; while the third procedure is used to deal with ignorance situations in which there is at least one alternative with totally missing information. Furthermore, an algorithm for group decision making with incomplete hesitant fuzzy linguistic preference relations is given. Finally, we illustrate our model with a case study about flood disaster risk evaluation. A comparative analysis is presented to testify the advantage of our method.

  18. Nature Disaster Risk Evaluation with a Group Decision Making Method Based on Incomplete Hesitant Fuzzy Linguistic Preference Relations.

    Science.gov (United States)

    Tang, Ming; Liao, Huchang; Li, Zongmin; Xu, Zeshui

    2018-04-13

    Because the natural disaster system is a very comprehensive and large system, the disaster reduction scheme must rely on risk analysis. Experts' knowledge and experiences play a critical role in disaster risk assessment. The hesitant fuzzy linguistic preference relation is an effective tool to express experts' preference information when comparing pairwise alternatives. Owing to the lack of knowledge or a heavy workload, information may be missed in the hesitant fuzzy linguistic preference relation. Thus, an incomplete hesitant fuzzy linguistic preference relation is constructed. In this paper, we firstly discuss some properties of the additive consistent hesitant fuzzy linguistic preference relation. Next, the incomplete hesitant fuzzy linguistic preference relation, the normalized hesitant fuzzy linguistic preference relation, and the acceptable hesitant fuzzy linguistic preference relation are defined. Afterwards, three procedures to estimate the missing information are proposed. The first one deals with the situation in which there are only n-1 known judgments involving all the alternatives; the second one is used to estimate the missing information of the hesitant fuzzy linguistic preference relation with more known judgments; while the third procedure is used to deal with ignorance situations in which there is at least one alternative with totally missing information. Furthermore, an algorithm for group decision making with incomplete hesitant fuzzy linguistic preference relations is given. Finally, we illustrate our model with a case study about flood disaster risk evaluation. A comparative analysis is presented to testify the advantage of our method.

  19. Cyber security risk evaluation of a nuclear I and C using BN and ET

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Jin Soo; Heo, Gyun Young [Dept. of Nuclear Engineering, Kyung Hee University, Yongin (Korea, Republic of); Son, Han Seong [Computer and Game Science, Joongbu University, Geumsan (Korea, Republic of)

    2017-04-15

    Cyber security is an important issue in the field of nuclear engineering because nuclear facilities use digital equipment and digital systems that can lead to serious hazards in the event of an accident. Regulatory agencies worldwide have announced guidelines for cyber security related to nuclear issues, including U.S. NRC Regulatory Guide 5.71. It is important to evaluate cyber security risk in accordance with these regulatory guides. In this study, we propose a cyber security risk evaluation model for nuclear instrumentation and control systems using a Bayesian network and event trees. As it is difficult to perform penetration tests on the systems, the evaluation model can inform research on cyber threats to cyber security systems for nuclear facilities through the use of prior and posterior information and backpropagation calculations. Furthermore, we suggest a methodology for the application of analytical results from the Bayesian network model to an event tree model, which is a probabilistic safety assessment method. The proposed method will provide insight into safety and cyber security risks.

  20. Cyber security risk evaluation of a nuclear I and C using BN and ET

    International Nuclear Information System (INIS)

    Shin, Jin Soo; Heo, Gyun Young; Son, Han Seong

    2017-01-01

    Cyber security is an important issue in the field of nuclear engineering because nuclear facilities use digital equipment and digital systems that can lead to serious hazards in the event of an accident. Regulatory agencies worldwide have announced guidelines for cyber security related to nuclear issues, including U.S. NRC Regulatory Guide 5.71. It is important to evaluate cyber security risk in accordance with these regulatory guides. In this study, we propose a cyber security risk evaluation model for nuclear instrumentation and control systems using a Bayesian network and event trees. As it is difficult to perform penetration tests on the systems, the evaluation model can inform research on cyber threats to cyber security systems for nuclear facilities through the use of prior and posterior information and backpropagation calculations. Furthermore, we suggest a methodology for the application of analytical results from the Bayesian network model to an event tree model, which is a probabilistic safety assessment method. The proposed method will provide insight into safety and cyber security risks

  1. Application of risk-based methods for inspection of nuclear power plant components

    International Nuclear Information System (INIS)

    Balkey, K.R.

    1992-01-01

    In-service inspections (ISIs) can play a significant role in minimizing equipment and structural failures. All aspects of inspections, i.e., objectives, method, timing, and the acceptance criteria for detected flaws can affect the probability of component failure. Where ISI programs exist, they are primarily based on prior experience and engineering judgment. At best, some include an implicit consideration of risk (probability of failure multiplied by consequence). Since late 1988, a multidisciplined American Society of Mechanical Engineers (ASME) Research Task Force on Risk-Based Inspection Guidelines has been addressing the general question of how to formally incorporate risk considerations into plans and requirements for the ISI of components and structural systems. The task force and steering committee that guided the project have concluded that appropriate analytical methods exist for evaluating and quantifying risks associated with pressure boundary and structural failures. With the support of about a dozen industry and government organizations, the research group has recommended a general methodology for establishing a risk-based inspection program that could be applied to any nuclear system or structural system

  2. A unified framework for evaluating the risk of re-identification of text de-identification tools.

    Science.gov (United States)

    Scaiano, Martin; Middleton, Grant; Arbuckle, Luk; Kolhatkar, Varada; Peyton, Liam; Dowling, Moira; Gipson, Debbie S; El Emam, Khaled

    2016-10-01

    It has become regular practice to de-identify unstructured medical text for use in research using automatic methods, the goal of which is to remove patient identifying information to minimize re-identification risk. The metrics commonly used to determine if these systems are performing well do not accurately reflect the risk of a patient being re-identified. We therefore developed a framework for measuring the risk of re-identification associated with textual data releases. We apply the proposed evaluation framework to a data set from the University of Michigan Medical School. Our risk assessment results are then compared with those that would be obtained using a typical contemporary micro-average evaluation of recall in order to illustrate the difference between the proposed evaluation framework and the current baseline method. We demonstrate how this framework compares against common measures of the re-identification risk associated with an automated text de-identification process. For the probability of re-identification using our evaluation framework we obtained a mean value for direct identifiers of 0.0074 and a mean value for quasi-identifiers of 0.0022. The 95% confidence interval for these estimates were below the relevant thresholds. The threshold for direct identifier risk was based on previously used approaches in the literature. The threshold for quasi-identifiers was determined based on the context of the data release following commonly used de-identification criteria for structured data. Our framework attempts to correct for poorly distributed evaluation corpora, accounts for the data release context, and avoids the often optimistic assumptions that are made using the more traditional evaluation approach. It therefore provides a more realistic estimate of the true probability of re-identification. This framework should be used as a basis for computing re-identification risk in order to more realistically evaluate future text de-identification tools

  3. Guidance to Risk-Informed Evaluation of Technical Specifications using PSA

    International Nuclear Information System (INIS)

    Baeckstroem, Ola; Haeggstroem, Anna; Maennistoe, Ilkka

    2010-04-01

    This report presents guidance for evaluation of Technical Specification conditions with PSA. It covers quality in PSA, how to verify that the PSA model is sufficiently robust and sufficiently complete and general requirements on methods. Acceptance criteria for evaluation of changes in the TS conditions are presented. As the probabilistic safety assessment (PSA) has developed over the years, it has demonstrated to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. and in that way making the PSAs as well as the decision tools better. This also means that it will be possible to take credit for safety system overcapacity as well as inherent safety features and strength of non-safety classed systems. However, PSA is only one of the tools that shall be used in an evaluation process of TS changes (strengthening/relaxation). PSA is an excellent tool to be used to verify the importance, and thereby possibly relaxation, of TS requirements. But, since PSA is only one tool in the evaluation, it is not sufficient in itself for defining which equipment that shall or shall not have TS requirements. The purpose of this guidance document is to provide general requirements, requirements on methods and acceptance criteria on risk-informed evaluation of TS changes based on PSA. The purpose is not to provide a single solution. As part of the review of the TS conditions this guidance specify requirements on: - Quality verification of the PSA model; - Verification that the PSA model is sufficiently robust with regard to SSCs for which requirements both are and are not defined by the TS; - Verification that the SSCs, for which TS demands are to be evaluated, are modelled in a sufficient manner; - Methods for performing the evaluation; - Which evaluation criteria that shall be used (and how that is verified to be correct); - Acceptance criteria: This guidance also briefly discusses the documentation of the analysis of the TS changes. This guidance

  4. Guidance to risk-informed evaluation of technical specifications using PSA

    International Nuclear Information System (INIS)

    Baeckstroem, O.; Haeggstroem, A.; Maennistoe, I.

    2010-10-01

    This report presents guidance for evaluation of Technical Specification conditions with PSA. It covers quality in PSA, how to verify that the PSA model is sufficiently robust and sufficiently complete and general requirements on methods. Acceptance criteria for evaluation of changes in the TS conditions are presented. As the probabilistic safety assessment (PSA) has developed over the years, it has demonstrated to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. and in that way making the PSAs as well as the decision tools better. This also means that it will be possible to take credit for safety system overcapacity as well as inherent safety features and strength of non-safety classed systems. However, PSA is only one of the tools that shall be used in an evaluation process of TS changes (strengthening/relaxation). PSA is an excellent tool to be used to verify the importance, and thereby possibly relaxation, of TS requirements. But, since PSA is only one tool in the evaluation, it is not sufficient in itself for defining which equipment that shall or shall not have TS requirements. The purpose of this guidance document is to provide general requirements, requirements on methods and acceptance criteria on risk-informed evaluation of TS changes based on PSA. The purpose is not to provide a single solution. As part of the review of the TS conditions this guidance specify requirements on: - Quality verification of the PSA model; - Verification that the PSA model is sufficiently robust with regard to SSCs for which requirements both are and are not defined by the TS; - Verification that the SSCs, for which TS demands are to be evaluated, are modelled in a sufficient manner; - Methods for performing the evaluation; - Which evaluation criteria that shall be used (and how that is verified to be correct); - Acceptance criteria: This guidance also briefly discusses the documentation of the analysis of the TS changes. This guidance

  5. Guidance to risk-informed evaluation of technical specifications using PSA

    Energy Technology Data Exchange (ETDEWEB)

    Baeckstroem, O.; Haeggstroem, A. (Scandpower AB, Stockholm (Sweden)); Maennistoe, I. (VTT, Helsingfors (Finland))

    2010-04-15

    This report presents guidance for evaluation of Technical Specification conditions with PSA. It covers quality in PSA, how to verify that the PSA model is sufficiently robust and sufficiently complete and general requirements on methods. Acceptance criteria for evaluation of changes in the TS conditions are presented. As the probabilistic safety assessment (PSA) has developed over the years, it has demonstrated to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. and in that way making the PSAs as well as the decision tools better. This also means that it will be possible to take credit for safety system overcapacity as well as inherent safety features and strength of non-safety classed systems. However, PSA is only one of the tools that shall be used in an evaluation process of TS changes (strengthening/relaxation). PSA is an excellent tool to be used to verify the importance, and thereby possibly relaxation, of TS requirements. But, since PSA is only one tool in the evaluation, it is not sufficient in itself for defining which equipment that shall or shall not have TS requirements. The purpose of this guidance document is to provide general requirements, requirements on methods and acceptance criteria on risk-informed evaluation of TS changes based on PSA. The purpose is not to provide a single solution. As part of the review of the TS conditions this guidance specify requirements on: - Quality verification of the PSA model; - Verification that the PSA model is sufficiently robust with regard to SSCs for which requirements both are and are not defined by the TS; - Verification that the SSCs, for which TS demands are to be evaluated, are modelled in a sufficient manner; - Methods for performing the evaluation; - Which evaluation criteria that shall be used (and how that is verified to be correct); - Acceptance criteria: This guidance also briefly discusses the documentation of the analysis of the TS changes. This guidance

  6. Guidance to Risk-Informed Evaluation of Technical Specifications using PSA

    Energy Technology Data Exchange (ETDEWEB)

    Baeckstroem, Ola; Haeggstroem, Anna (Scandpower AB, Stockholm (Sweden)); Maennistoe, Ilkka (VTT, Helsingfors (Finland))

    2010-04-15

    This report presents guidance for evaluation of Technical Specification conditions with PSA. It covers quality in PSA, how to verify that the PSA model is sufficiently robust and sufficiently complete and general requirements on methods. Acceptance criteria for evaluation of changes in the TS conditions are presented. As the probabilistic safety assessment (PSA) has developed over the years, it has demonstrated to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. and in that way making the PSAs as well as the decision tools better. This also means that it will be possible to take credit for safety system overcapacity as well as inherent safety features and strength of non-safety classed systems. However, PSA is only one of the tools that shall be used in an evaluation process of TS changes (strengthening/relaxation). PSA is an excellent tool to be used to verify the importance, and thereby possibly relaxation, of TS requirements. But, since PSA is only one tool in the evaluation, it is not sufficient in itself for defining which equipment that shall or shall not have TS requirements. The purpose of this guidance document is to provide general requirements, requirements on methods and acceptance criteria on risk-informed evaluation of TS changes based on PSA. The purpose is not to provide a single solution. As part of the review of the TS conditions this guidance specify requirements on: - Quality verification of the PSA model; - Verification that the PSA model is sufficiently robust with regard to SSCs for which requirements both are and are not defined by the TS; - Verification that the SSCs, for which TS demands are to be evaluated, are modelled in a sufficient manner; - Methods for performing the evaluation; - Which evaluation criteria that shall be used (and how that is verified to be correct); - Acceptance criteria: This guidance also briefly discusses the documentation of the analysis of the TS changes. This guidance

  7. A GIS-based comparison of the Mexican national and IUCN methods for determining extinction risk.

    Science.gov (United States)

    Arroyo, Teresa P Feria; Olson, Mark E; García-Mendoza, Abisaí; Solano, Eloy

    2009-10-01

    The national systems used in the evaluation of extinction risk are often touted as more readily applied and somehow more regionally appropriate than the system of the International Union for Conservation of Nature (IUCN). We compared risk assessments of the Mexican national system (method for evaluation of risk of extinction of wild species [MER]) with the IUCN system for the 16 Polianthes taxa (Agavaceae), a genus of plants with marked variation in distribution sizes. We used a novel combination of herbarium data, geographic information systems (GIS), and species distribution models to provide rapid, repeatable estimates of extinction risk. Our GIS method showed that the MER and the IUCN system use similar data. Our comparison illustrates how the IUCN method can be applied even when all desirable data are not available, and that the MER offers no special regional advantage with respect to the IUCN regional system. Instead, our results coincided, with both systems identifying 14 taxa of conservation concern and the remaining two taxa of low risk, largely because both systems use similar information. An obstacle for the application of the MER is that there are no standards for quantifying the criteria of habitat condition and intrinsic biological vulnerability. If these impossible-to-quantify criteria are left out, what are left are geographical distribution and the impact of human activity, essentially the considerations we were able to assess for the IUCN method. Our method has the advantage of making the IUCN criteria easy to apply, and because each step can be standardized between studies, it ensures greater comparability of extinction risk estimates among taxa.

  8. Method for environmental risk analysis (MIRA) revision 2007

    International Nuclear Information System (INIS)

    2007-04-01

    OLF's instruction manual for carrying out environmental risk analyses provides a united approach and a common framework for environmental risk assessments. This is based on the best information available. The manual implies standardizations of a series of parameters, input data and partial analyses that are included in the environmental risk analysis. Environmental risk analyses carried out according to the MIRA method will thus be comparable between fields and between companies. In this revision an update of the text in accordance with today's practice for environmental risk analyses and prevailing regulations is emphasized. Moreover, method adjustments for especially protected beach habitats have been introduced, as well as a general method for estimating environmental risk concerning fish. Emphasis has also been put on improving environmental risk analysis' possibilities to contribute to a better management of environmental risk in the companies (ml)

  9. THE APPLICATION OF THE METHOD ENVIRONMENTAL VALUE AT RISK (EVaR IN ENVIRONMENTAL ECONOMY

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia I. PICIU

    2014-04-01

    Full Text Available Taking into account the fact that the methodology Value at Risk or the method VaR, which is omnipresent in investment banking and which has lately become a standard in the procedure of evaluating risks for any category of economic activities, we shall use a technique that is compatible with the VaR-market, called Environmental Value at Risk or EvaR. While the VaR- market uses a level of trust of 95%, the EvaR uses a set of levels up to 99,999%. Thus, we shall try to analyze the variables of the method EVaR, and the way in which this model can be applied as a risk of the lack (rarity of petroleum. This risk is not only analyzed as a unique risk of growing the prices, but also as an uncertainty risk on volatile markets, in which the price and the volatility are the main variables used by the function EVaR.

  10. A Conceptual Framework for the Evaluation of Emergency Risk Communications

    Science.gov (United States)

    Lin, Leesa; Gamhewage, Gaya M.

    2017-01-01

    Objectives. To articulate a conceptual framework in support of evaluation activities in emergency risk communications (ERC). Methods. The framework proposed is based on a systematic review of the scientific literature (2001–2016) combined with data derived from a series of semistructured interviews with experts and practitioners in ERC, and it is designed to support local, national, and international public health organizations in implementing evaluation studies in ERC. Results. We identified a list of ERC outcomes from the full-text review of 152 articles and categorized these into 3 groups, depending upon the level at which the outcome was measured: (1) information environment, (2) population, and (3) public health system. We analyzed interviewees’ data from 18 interviews to identify practices and processes related to the effectiveness of ERC and included these as key structural components and processes in the developed evaluation framework. Conclusions. Researchers and public health practitioners interested in the evaluation of ERC can use the conceptual framework described in this article to guide the development of evaluation studies and methods for assessing communication outcomes related to public health emergencies. PMID:28892436

  11. Risk assessment in a foundry unit by energy trace and barrier analysis method (ETBA

    Directory of Open Access Journals (Sweden)

    S.A. Ayati

    2010-01-01

    Full Text Available Background and aimsAs a Development of Industrial process, human, environment,equipment, material and validity of system has been exposed to hazardous conditions. Regards of32.3 percent of occupations in industries, this study focused on risk assessment of foundry unit byenergy trace and barrier analysis (ETBA method and presented approaches to control of accident.Methodsthe recent study is as a case study one to risk assessment in a foundry unit in Qazvinindustrial city in1387. In this study risks were founded by ETBA method and evaluated by MILSTD-882B. Data were collected by direct observations, interview with workers and supervisorand engineers, walking-talking through method, documents investigation of operationalprocessors, preventive maintenances, equipment technical properties, accidental and medicaldocuments. Finally ETBA worksheets completed.Findingstotally 154 risks has been found. 40 from total are been unacceptable risk, 68unfavorable and also 46 acceptable but with remediation action. Casting workshop had risks morethan other workshops (with 74 identified risks.Potential and heat energies were founded as mosthazardous energies, with respectively 51 and 38 risk cases.ConclusionThis study recommended to be done actions for identification and control risk,such as: safety training, occupation training, preventive maintenance, contract safety, safetycommunication and safety audit group.

  12. Societal Risk Evaluation Scheme (SRES: Scenario-Based Multi-Criteria Evaluation of Synthetic Biology Applications.

    Directory of Open Access Journals (Sweden)

    Christopher L Cummings

    Full Text Available Synthetic biology (SB applies engineering principles to biology for the construction of novel biological systems designed for useful purposes. From an oversight perspective, SB products come with significant uncertainty. Yet there is a need to anticipate and prepare for SB applications before deployment. This study develops a Societal Risk Evaluation Scheme (SRES in order to advance methods for anticipatory governance of emerging technologies such as SB. The SRES is based upon societal risk factors that were identified as important through a policy Delphi study. These factors range from those associated with traditional risk assessment, such as health and environmental consequences, to broader features of risk such as those associated with reversibility, manageability, anticipated levels of public concern, and uncertainty. A multi-disciplinary panel with diverse perspectives and affiliations assessed four case studies of SB using the SRES. Rankings of the SRES components are compared within and across the case studies. From these comparisons, we found levels of controllability and familiarity associated with the cases to be important for overall SRES rankings. From a theoretical standpoint, this study illustrates the applicability of the psychometric paradigm to evaluating SB cases. In addition, our paper describes how the SRES can be incorporated into anticipatory governance models as a screening tool to prioritize research, information collection, and dialogue in the face of the limited capacity of governance systems. To our knowledge, this is the first study to elicit data on specific cases of SB with the goal of developing theory and tools for risk governance.

  13. Consumer Evaluations of Food Risk Management Quality in Europe

    NARCIS (Netherlands)

    Kleef, van E.; Houghton, J.R.; Krystallis, A.; Pfenning, U.; Rowe, G.; Dijk, van H.; Lans, van der I.A.; Frewer, L.J.

    2007-01-01

    In developing and implementing appropriate food risk management strategies, it is important to understand how consumers evaluate the quality of food risk management practices. The aim of this study is to model the underlying psychological factors influencing consumer evaluations of food risk

  14. Gasbuggy Site Assessment and Risk Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-03-01

    This report describes the geologic and hydrologic conditions and evaluates potential health risks to workers in the natural gas industry in the vicinity of the Gasbuggy, New Mexico, site, where the U.S. Atomic Energy Commission detonated an underground nuclear device in 1967. The 29-kiloton detonation took place 4,240 feet below ground surface and was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation in the San Juan Basin, Rio Arriba County, New Mexico, on land administered by Carson National Forest. A site-specific conceptual model was developed based on current understanding of the hydrologic and geologic environment. This conceptual model was used for establishing plausible contaminant exposure scenarios, which were then evaluated for human health risk potential. The most mobile and, therefore, the most probable contaminant that could result in human exposure is tritium. Natural gas production wells were identified as having the greatest potential for bringing detonation-derived contaminants (tritium) to the ground surface in the form of tritiated produced water. Three exposure scenarios addressing potential contamination from gas wells were considered in the risk evaluation: a gas well worker during gas-well-drilling operations, a gas well worker performing routine maintenance, and a residential exposure. The residential exposure scenario was evaluated only for comparison; permanent residences on national forest lands at the Gasbuggy site are prohibited

  15. A case study for evaluating ecological risks at the Idaho National Engineering Laboratory (INEL)

    International Nuclear Information System (INIS)

    Peterson, S.; Brewer, R.; Morris, R.; VanHorn, R.

    1994-01-01

    A case study was conducted as a component of the development of guidance for ecological risk assessment at the Department of Energy's Idaho National Engineering Laboratory (INEL). The INEL is a large facility in southeastern Idaho, encompassing expanses of sagebrush-steppe that harbor numerous wildlife species. Nuclear research and waste disposal activities have resulted in releases of radionuclides at various sites. Due to the size and number of potentially contaminated areas, a cost-effective method was needed to evaluate ecological risks and to identify data needs for remedial investigations. Screening-level assessment approaches were developed to evaluate data collected from previous site investigations. Above-background concentrations of radionuclides and other contaminants in media were compared to risk-based criteria, which were derived from sources such as recent publications of the International Atomic Energy Agency (IAEA) and National Council on Radiation Protection and Measurements (NCRP). Site-specific risks to plants and wildlife were estimated for contaminants exceeding criteria. Dose rates derived using various estimation methods were compared to reference doses for wildlife obtained from IAEA, NCRP, and other publications

  16. Risk evaluation of remedial alternatives for the Hanford Site

    International Nuclear Information System (INIS)

    Clark, S.W.; Lane, N.K.; Swenson, L.

    1994-01-01

    Risk assessment is one of the many tools used to evaluate and select remedial alternatives and evaluate the risk associated with selected remedial alternatives during and after implementation. The risk evaluation of remedial alternatives (RERA) is performed to ensure selected alternatives are protective of human health and the environment. Final remedy selection is promulgated in a record of decision (ROD) and risks of the selected alternatives are documented. Included in the ROD documentation are the risk-related analyses for long-term effectiveness, short-term effectiveness, and overall protection of human health and the environment including how a remedy will eliminate, reduce or control risks and whether exposure will be reduced to acceptable levels. A major goal of RERA in the process leading to a ROD is to provide decision-makers with specific risk information that may be needed to choose among alternatives. For the Hanford Site, there are many considerations that must be addressed from a risk perspective. These include the large size of the Hanford Site, the presence of both chemical and radionuclide contamination, one likelihood of many analogues sites, public and worker health and safety, and stakeholder concern with ecological impacts from site contamination and remedial actions. A RERA methodology has been promulgated to (1) identify the points in the process leading to a ROD where risk assessment input is either required or desirable and (2) provide guidance on how to evaluate risks associated with remedial alternatives under consideration. The methodology and evaluations parallel EPA guidance requiring consideration of short-term impacts and the overall protectiveness of remedial actions for evaluating potential human health and ecological risks during selection of remedial alternatives, implementation of remedial measures, and following completion of remedial action

  17. Nuclear data evaluation method and evaluation system

    International Nuclear Information System (INIS)

    Liu Tingjin

    1995-01-01

    The evaluation methods and Nuclear Data Evaluation System have been developed in China. A new version of the system has been established on Micro-VAX2 computer, which is supported by IAEA under the technology assistance program. The flow chart of Chinese Nuclear Data Evaluation System is shown out. For last ten years, the main efforts have been put on the double differential cross section, covariance data and evaluated data library validation. The developed evaluation method and Chinese Nuclear Data Evaluation System have been widely used at CNDC and in Chinese Nuclear Data Network for CENDL. (1 tab., 15 figs.)

  18. Environmental risk assessment for plant pests: a procedure to evaluate their impacts on ecosystem services.

    Science.gov (United States)

    Gilioli, G; Schrader, G; Baker, R H A; Ceglarska, E; Kertész, V K; Lövei, G; Navajas, M; Rossi, V; Tramontini, S; van Lenteren, J C

    2014-01-15

    The current methods to assess the environmental impacts of plant pests differ in their approaches and there is a lack of the standardized procedures necessary to provide accurate and consistent results, demonstrating the complexity of developing a commonly accepted scheme for this purpose. By including both the structural and functional components of the environment threatened by invasive alien species (IAS), in particular plant pests, we propose an environmental risk assessment scheme that addresses this complexity. Structural components are investigated by evaluating the impacts of the plant pest on genetic, species and landscape diversity. Functional components are evaluated by estimating how plant pests modify ecosystem services in order to determine the extent to which an IAS changes the functional traits that influence ecosystem services. A scenario study at a defined spatial and temporal resolution is then used to explore how an IAS, as an exogenous driving force, may trigger modifications in the target environment. The method presented here provides a standardized approach to generate comparable and reproducible results for environmental risk assessment as a component of Pest Risk Analysis. The method enables the assessment of overall environmental risk which integrates the impacts on different components of the environment and their probabilities of occurrence. The application of the proposed scheme is illustrated by evaluating the environmental impacts of the invasive citrus long-horn beetle, Anoplophora chinensis. © 2013.

  19. Evaluating risk management strategies in resource planning

    International Nuclear Information System (INIS)

    Andrews, C.J.

    1995-01-01

    This paper discusses the evaluation of risk management strategies as a part of integrated resource planning. Value- and scope-related uncertainties can be addressed during the process of planning, but uncertainties in the operating environment require technical analysis within planning models. Flexibility and robustness are two key classes of strategies for managing the risk posed by these uncertainties. This paper reviews standard capacity expansion planning models and shows that they are poorly equipped to compare risk management strategies. Those that acknowledge uncertainty are better at evaluating robustness than flexibility, which implies a bias against flexible options. Techniques are available to overcome this bias

  20. PROOF OF CONCEPT FOR A HUMAN RELIABILITY ANALYSIS METHOD FOR HEURISTIC USABILITY EVALUATION OF SOFTWARE

    International Nuclear Information System (INIS)

    Ronald L. Boring; David I. Gertman; Jeffrey C. Joe; Julie L. Marble

    2005-01-01

    An ongoing issue within human-computer interaction (HCI) is the need for simplified or ''discount'' methods. The current economic slowdown has necessitated innovative methods that are results driven and cost effective. The myriad methods of design and usability are currently being cost-justified, and new techniques are actively being explored that meet current budgets and needs. Recent efforts in human reliability analysis (HRA) are highlighted by the ten-year development of the Standardized Plant Analysis Risk HRA (SPAR-H) method. The SPAR-H method has been used primarily for determining human centered risk at nuclear power plants. The SPAR-H method, however, shares task analysis underpinnings with HCI. Despite this methodological overlap, there is currently no HRA approach deployed in heuristic usability evaluation. This paper presents an extension of the existing SPAR-H method to be used as part of heuristic usability evaluation in HCI

  1. Risk Evaluation for CO{sub 2} Geosequestration in the Knox Supergroup

    Energy Technology Data Exchange (ETDEWEB)

    Leetaru, Hannes

    2014-01-31

    .e., persistently porous and permeable) injection depths within the overall formation. Less direct implications include the vertical position of the Potosi within the rock column and the absence of a laterally extensive shale caprock immediately overlying the Potosi. Based on modeling work done partly in association with this risk report, risks that should also be evaluated include the ability of available methods to predict and track the development of a CO{sub 2} plume as it migrates away from the injection point(s). The geologic and hydrodynamic uncertainties present risks that are compounded at the stage of acquiring necessary drilling and injection permits. It is anticipated that, in the future, a regional geologic study or CO{sub 2}-emitter request may identify a small specific area as a prospective CCS project site. At that point, the FEPs lists provided in this report should be evaluated by experts for their relative levels of risk. A procedure for this evaluation is provided. The higher-risk FEPs should then be used to write project-specific scenarios that may themselves be evaluated for risk. Then, actions to reduce and to manage risk can be described and undertaken. The FEPs lists provided as Appendix 2 should not be considered complete, as potentially the most important risks are ones that have not yet been thought of. But these lists are intended to include the most important risk elements pertinent to a Potosi-target CCS project, and they provide a good starting point for diligent risk identification, evaluation, and management.

  2. Results of the application of the Risk Evaluation System in Radiotherapy (RESRA) in radiotherapy facilities in Mexico

    International Nuclear Information System (INIS)

    Paz G, A.; Godinez S, V.

    2013-10-01

    The present work describes the main results of the risk evaluation for some radiotherapy treatments with lineal accelerators, cobalt 60, brachytherapy of high dose rate and brachytherapy of low dose rate that are realize in Mexico. These evaluations were carried out applying the risk matrices method with the tool computer risk evaluation system in radiotherapy, accessible for the national users through internet, and developed by the Comision Nacional de Seguridad Nuclear y Salvaguardias in Mexico, in cooperation with the Forum of Ibero-American regulators. The used methodology is based on the risk matrices method that is a mathematical tool for the risk evaluation, and it was centered in the evaluation from the risk to which are exposed the patients, the occupational exposed personnel and people in general, by the mechanical faults of the treatment equipment s, bad calibrations, human errors, or any other event initiator of accidents. The events initiators of accidents are defined as those undesirable events that can produce and administration of an excessive dose or a sub-dose of the prescribed dose by the doctor, to the planned objective volume, or undesirable dose to the patient's regions or dose to occupational exposed personnel or people in general. The barriers are the actions and systems as mechanical switches, interlocks or alarms, dedicated to avoid that these accidents take place. The evaluation analysis of the risk developed by the members of the Forum for radiotherapy facilities together with the software RESRA has demonstrated to be useful in the prevention of many possible accidents that have happened in the past in other facilities and can avoid many others in the future. (Author)

  3. Psychosocial risks evaluation factors: study with higher education teachers

    Directory of Open Access Journals (Sweden)

    Sara Lopes Borges

    2018-02-01

    Method: The study consisted of the administration of two instruments, one for the characterization of the sample and the other for assessing psychosocial risk factors — the Copenhagen Psychosocial Questionnaire — consisting of 76 items (5-point Likert scale, distributed in five dimensions, which measure indicators of exposure to psychosocial risks and their effects. Results: The study included 59 teachers, mostly men (50.8%, aged between 41 - 50 years (45.8%, with master's degree (59%, assistant professors (47.5%; with a stable employment relationship (68%, years of service between 14-17 years (18.7% and teaching between 11 - 17 hours a week (64.4%. The analysis of the various subscales revealed a psychosocial risk, showing that teachers are in a situation of vulnerability. There were significant differences between the risks experienced in public higher education and those experienced in private higher education. Gender, age, academic background, and professional category influenced the type of psychosocial risk. Conclusions: The study confirms the importance of the evaluation of psychosocial risk factors in the exercise of the teaching profession in higher education. It is recognized that it is necessary to assess and manage psychosocial risks in order to promote healthy working conditions, ensure respect and fair treatment, and encourage the promotion of work / family life balance, in order to minimize psychosocial risks and situations of vulnerability in higher education teachers.

  4. Methods of assessing nuclear power plant risks

    International Nuclear Information System (INIS)

    Skvarka, P.; Kovacz, Z.

    1985-01-01

    The concept of safety evalution is based on safety criteria -standards or set qualitative values of parameters and indices used in designing nuclear power plants, incorporating demands on the quality of equipment and operation of the plant, its siting and technical means for achieving nuclear safety. The concepts are presented of basic and optimal risk values. Factors are summed up indispensable for the evaluation of the nuclear power plant risk and the present world trend of evaluation based on probability is discussed. (J.C.)

  5. Critical review of methods for risk ranking of food related hazards, based on risks for human health

    DEFF Research Database (Denmark)

    van der Fels-Klerx, H. J.; van Asselt, E. D.; Raley, M.

    2018-01-01

    This study aimed to critically review methods for ranking risks related to food safety and dietary hazards on the basis of their anticipated human health impacts. A literature review was performed to identify and characterize methods for risk ranking from the fields of food, environmental science......, and the risk ranking method characterized. The methods were then clustered - based on their characteristics - into eleven method categories. These categories included: risk assessment, comparative risk assessment, risk ratio method, scoring method, cost of illness, health adjusted life years, multi......-criteria decision analysis, risk matrix, flow charts/decision trees, stated preference techniques and expert synthesis. Method categories were described by their characteristics, weaknesses and strengths, data resources, and fields of applications. It was concluded there is no single best method for risk ranking...

  6. A new method to evaluate human-robot system performance

    Science.gov (United States)

    Rodriguez, G.; Weisbin, C. R.

    2003-01-01

    One of the key issues in space exploration is that of deciding what space tasks are best done with humans, with robots, or a suitable combination of each. In general, human and robot skills are complementary. Humans provide as yet unmatched capabilities to perceive, think, and act when faced with anomalies and unforeseen events, but there can be huge potential risks to human safety in getting these benefits. Robots provide complementary skills in being able to work in extremely risky environments, but their ability to perceive, think, and act by themselves is currently not error-free, although these capabilities are continually improving with the emergence of new technologies. Substantial past experience validates these generally qualitative notions. However, there is a need for more rigorously systematic evaluation of human and robot roles, in order to optimize the design and performance of human-robot system architectures using well-defined performance evaluation metrics. This article summarizes a new analytical method to conduct such quantitative evaluations. While the article focuses on evaluating human-robot systems, the method is generally applicable to a much broader class of systems whose performance needs to be evaluated.

  7. Método para avaliação do Risco Potencial no âmbito dos Laboratórios Oficiais – Método ARP-LAB / Evaluation Method of Potential Risk under the Official Laboratories: EPR-LAB Method

    Directory of Open Access Journals (Sweden)

    Elizabeth Valverde Macedo

    2015-08-01

    Full Text Available O homem encontra-se exposto a inúmeros produtos tecnológicos, e dentre eles os medicamentos, que geram riscos cada vez mais próximos do imponderável. Duas áreas, com ampla inclusão em vários campos do conhecimento, permeiam o ambiente dos laboratórios envolvidos no monitoramento da qualidade destes produtos. Estas são a metrologia e o risco. O objetivo deste trabalho foi elaborar um Método para Avaliação do Risco Potencial dos laboratórios onde são realizados ensaios em medicamentos (Método ARP-LAB, minimizando assim os resultados com confiabilidade analítica duvidosa. A metodologia utilizada foi baseada no Modelo de Avaliação de Risco Potencial. A referência técnica foi a RDC 11/12 – ANVISA/MS que, após análise crítica, resultou na elaboração de Indicadores de Controle do Risco (ICR que foram planificados no software Excel®. Como resultado, o Método ARP-LAB apresentou 167 ICR que, apesar do grande número de indicadores, mostrou-se bastante útil, aplicável e de fácil utilização ao ambiente laboratorial. Através dele é possível identificar as categorias das causas associadas ao desvio de cada ICR. ----------------------------------------------------------------------------------------------- Humans are exposed to numerous technological products, among them are drugs with increasingly varied risks. Two areas of investigation permeate the environment of laboratories involved in monitoring drug quality. These are metrology and risk. The objective of this study was to elaborate an Evaluation Method of Potential Risk (EPR-LAB Method for drug testing laboratories, minimizing analytical results with questionable reliability. The methodology used was based on the Model of Potential Risk Evaluation. The technical reference was the RDC 11/12 - ANVISA / MS. After critical analysis this study resulted in the development of Risk Control Indicators (RCI that were planned in the Excel software. The EPR-LAB Method developed

  8. THE IMPORTANCE OF EVALUATION OF RISK MANAGEMENT IN BUSINESS

    Directory of Open Access Journals (Sweden)

    SLOBODAN POPOVIĆ

    2015-10-01

    Full Text Available Economies with dominant private ownership and developed market institutions build their prosperity on a firm`s goal function in a form of maximization owner`s wealth. Financial situation of business organization is most important indicate that shows level of financial health. The creation of value for the owners imply two matters simultaneously competitive advantage and the evaluation of economic effects. Among economic activities, establishes the different types of addiction. In this work authors draw attention to two categories: the functional and stochastic. Case studies will be cash flows of investment and the contribution of the stochastic component of the risk of enterprise value. Methodological dominated analytical and descriptive methods. Management in the process of evaluation of investment seen what happens behind the projections of cash flows and estimates of available chances for possible modifications. The purpose of the discussion in this section refers to the warning that the application of the rules of net present values does not mean the completion of the management process at the moment of the decision on the selection of investments. In this study, we analyze the influence of stochastic risk in the creation of enterprise value, especially if the risk is managed improperly. In this connection, the starting hypothesis is that adequately compensate for risk has a positive effect on new investments and reduce the antagonism of shareholders and other creditors of the company.

  9. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  10. The Development of a Plant Risk Evaluation (PRE) Tool for Assessing the Invasive Potential of Ornamental Plants

    OpenAIRE

    Conser, Christiana; Seebacher, Lizbeth; Fujino, David W.; Reichard, Sarah; DiTomaso, Joseph M.

    2015-01-01

    Weed Risk Assessment (WRA) methods for evaluating invasiveness in plants have evolved rapidly in the last two decades. Many WRA tools exist, but none were specifically designed to screen ornamental plants prior to being released into the environment. To be accepted as a tool to evaluate ornamental plants for the nursery industry, it is critical that a WRA tool accurately predicts non-invasiveness without falsely categorizing them as invasive. We developed a new Plant Risk Evaluation (PRE) too...

  11. A novel method for monitoring high-risk breast cancer with tumor markers

    DEFF Research Database (Denmark)

    Sölétormos, G; Nielsen, D; Schiøler, V

    1993-01-01

    cancer. METHODS: Ninety females with high-risk breast cancer were included in the study. Response evaluation was based upon clinical examination, x-rays or histology and elaborated marker criteria. RESULTS: During the marker monitoring period, metastases in four patients were confined to skin or lymph......BACKGROUND: An early and reliable diagnosis of metastatic spread has increased interest in serum tumor markers. This study investigated the ability of CA 15.3, CEA, and TPA to identify, predict, and exclude metastases in bone/viscera during adjuvant treatment and follow-up of high-risk breast...

  12. Risk evaluation system for operational events and inspection findings

    International Nuclear Information System (INIS)

    Lopez G, A.; Godinez S, V.; Lopez M, R.

    2010-10-01

    The Mexican Nuclear Regulatory Commission has developed an adaptation of the US NRC Significance Determination Process (SDP) to evaluate the risk significance of operational events and inspection findings in Laguna Verde nuclear power plant. The Mexican Nuclear Regulatory Commission developed a plant specific flow chart for preliminary screening instead of the open questionnaire used by the US NRC-SDP, with the aim to improve the accuracy of the screening process. Also, the work sheets and support information tables required by the SDP were built up in an Excel application which allows to perform the risk evaluation in an automatic way, focusing the regulator staff efforts in the risk significance analysis instead of the risk calculation tasks. In order to construct this tool a simplified PRA model was developed and validated with the individual plant examination model. This paper shows the Mexican Nuclear Regulatory Commission process and some risk events evaluations performed using the Risk Evaluation System for Operational Events and Inspection Findings (SERHE, by its acronyms in Spanish). (Author)

  13. Evaluation of mercury speciation by EPA (Draft) Method 29

    Energy Technology Data Exchange (ETDEWEB)

    Laudal, D.L.; Heidt, M.K. [Energy & Environmental Research Center, Grand Forks, ND (United States); Nott, B. [Electric Power Research Institute, Palo Alto, CA (United States)

    1995-11-01

    The 1990 Clean Air Act Amendments require that the U.S. Environmental protection Agency (EPA) assess the health risks associated with mercury emissions. Also, the law requires a separate assessment of health risks posed by the emission of 189 tract chemicals (including mercury) for electric utility steam-generating units. In order to conduct a meaningful assessment of health and environmental effects, we must have, among other things, a reliable and accurate method to measure mercury emissions. In addition, the rate of mercury deposition and the type of control strategies used may depend upon the type of mercury emitted (i.e., whether it is in the oxidized or elemental form). It has been speculated that EPA (Draft) Method 29 can speciate mercury by selective absorption; however, this claim has yet to be proven. The Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) have contracted with the Energy & Environmental Research Center (EERC) at University of North Dakota to evaluate EPA (Draft) Method 29 at the pilot-scale level. The objective of the work is to determine whether EPA (Draft) Method 29 can reliably quantify and speciate mercury in the flue gas from coal-fired boilers.

  14. Risk-Informed SSCs Categorization: Elicitation Method of Expert's Opinion

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Yang, Joon Eon; Kim, Kil Yoo

    2005-01-01

    The regulations have been performing by deterministic way since nuclear power plants have been operating. However, some SSCs identified as safety-significance by deterministic way, were turned out to be low or non safety-significant and some SSCs identified as non-safety significance were turned out to be high safety-significant according to the results of PSA. Considering these risk insights, Regulatory Guide 1.174 and 10CFR50.69 were drawn up, and we can re-categorize the SSCs according to their safety significance. Therefore, a study and an interest about the risk-informed SSCs re-categorization and treatment has been continued. The objective of this regulatory initiative is to adjust the scope of equipment subject to special regulatory treatment to better focus licensee and regulatory attention and resources on equipment that has safety significance. Current most regulations define the plant equipment necessary to meet deterministic regulatory basis as 'safety-related.' This equipment is subject to special treatment regulations. Other plant equipment is categorized as 'non-safety related,' and is not subject to a select number of special treatment requirement or a subset of those requirement. However, risk information is not a magic tool making a decision but a supporting tool to categorize SSCs. This is because only small parts of a plant are modeled in PSA model. Thus, engineering and deterministic judgments are also used for risk-informed SSCs categorization, and expert opinion elicitation is very important for risk-informed SSCs categorization. Therefore, we need a rational method to elicit the expert's opinions, and in this study, we developed a systematic method for expert elicitation to categorize the nuclear power plants' SSCs. Current states for SSCs categorization of the USA and the existing methods for expert elicitation were surveyed and more systematic way eliciting the expert opinions and combining was developed. To validate the developed method

  15. Radiation safety assessment of treatment teletherapy linear accelerators using the method of the risk matrix

    International Nuclear Information System (INIS)

    Dumenigo Gonzalez, Cruz; Vilaragut Llanes, Juan J.; Morales Lopez, Jorge L.

    2009-01-01

    Accidents in the world of radiation, demonstrating the need for deepen security assessments. This study evaluates the safety of the treatment of teletherapy linear accelerator (LINAC) at a hospital in Cuba, based on applying the method Risk Matrix. This method has been used for many years in conventional industry, is simple, easy to apply and is based on the equation General risk R = f * P * C (where: f frequency of occurrence of the initiating event, P probability of failure of all barriers and magnitude of the consequences C expected). We have evaluated 140 accident sequences that were identified during the analysis of the treatment process. It was identified that 5 sequences are associated with the level of risk is very low, 96 low-risk, high risk and 39 with no very high risk. All accident sequences associated with high risk (considered unacceptable), have an impact on patients, and no concerns workers and public, which reaffirms that major security problems are related to radiation protection of patients. 34 sequences accidental high risk are associated with human errors and failures only 5 to equipment (LINAC, TPS, TAC, etc.). demonstrating the importance of human error. It shows that 35 of the 39 high-risk accident sequences leading to serious or very serious consequences for patients, which would mean the death of one or more patients, making specific recommendations to reduce risk in these cases. The findings of this work and regulators allow users to refine their programs quality assurance and inspection and suggest the hospital management, prioritize material resources according to criteria of irrigation management. (author)

  16. Augmenting the Deliberative Method for Ranking Risks.

    Science.gov (United States)

    Susel, Irving; Lasley, Trace; Montezemolo, Mark; Piper, Joel

    2016-01-01

    The Department of Homeland Security (DHS) characterized and prioritized the physical cross-border threats and hazards to the nation stemming from terrorism, market-driven illicit flows of people and goods (illegal immigration, narcotics, funds, counterfeits, and weaponry), and other nonmarket concerns (movement of diseases, pests, and invasive species). These threats and hazards pose a wide diversity of consequences with very different combinations of magnitudes and likelihoods, making it very challenging to prioritize them. This article presents the approach that was used at DHS to arrive at a consensus regarding the threats and hazards that stand out from the rest based on the overall risk they pose. Due to time constraints for the decision analysis, it was not feasible to apply multiattribute methodologies like multiattribute utility theory or the analytic hierarchy process. Using a holistic approach was considered, such as the deliberative method for ranking risks first published in this journal. However, an ordinal ranking alone does not indicate relative or absolute magnitude differences among the risks. Therefore, the use of the deliberative method for ranking risks is not sufficient for deciding whether there is a material difference between the top-ranked and bottom-ranked risks, let alone deciding what the stand-out risks are. To address this limitation of ordinal rankings, the deliberative method for ranking risks was augmented by adding an additional step to transform the ordinal ranking into a ratio scale ranking. This additional step enabled the selection of stand-out risks to help prioritize further analysis. © 2015 Society for Risk Analysis.

  17. A risk assessment method for accidental releases from nuclear power plants in Europe

    NARCIS (Netherlands)

    Slaper H; Blaauboer RO; Eggink GJ

    1994-01-01

    At present over 200 nuclear power reactors are operational. The question raised is to what extent possible accidents with nuclear power reactors pose a risk for the European population. In this report a method is described for evaluating the probability of death due to stochastic effects, combining

  18. A risk assessment method for accidental releases from nuclear power plants in Europe

    NARCIS (Netherlands)

    Slaper H; Blaauboer RO; Eggink GJ

    1994-01-01

    At present over 200 nuclear power reactors are operational. The question raised is to what extent possible accidents with nuclear power reactors pose a risk for the European population. In this report a method is described for evaluating the probability of death due to stochastic effects,

  19. Review on pen-and-paper-based observational methods for assessing ergonomic risk factors of computer work.

    Science.gov (United States)

    Rahman, Mohd Nasrull Abdol; Mohamad, Siti Shafika

    2017-01-01

    Computer works are associated with Musculoskeletal Disorders (MSDs). There are several methods have been developed to assess computer work risk factor related to MSDs. This review aims to give an overview of current techniques available for pen-and-paper-based observational methods in assessing ergonomic risk factors of computer work. We searched an electronic database for materials from 1992 until 2015. The selected methods were focused on computer work, pen-and-paper observational methods, office risk factors and musculoskeletal disorders. This review was developed to assess the risk factors, reliability and validity of pen-and-paper observational method associated with computer work. Two evaluators independently carried out this review. Seven observational methods used to assess exposure to office risk factor for work-related musculoskeletal disorders were identified. The risk factors involved in current techniques of pen and paper based observational tools were postures, office components, force and repetition. From the seven methods, only five methods had been tested for reliability. They were proven to be reliable and were rated as moderate to good. For the validity testing, from seven methods only four methods were tested and the results are moderate. Many observational tools already exist, but no single tool appears to cover all of the risk factors including working posture, office component, force, repetition and office environment at office workstations and computer work. Although the most important factor in developing tool is proper validation of exposure assessment techniques, the existing observational method did not test reliability and validity. Futhermore, this review could provide the researchers with ways on how to improve the pen-and-paper-based observational method for assessing ergonomic risk factors of computer work.

  20. Evaluation of the performance of existing non-laboratory based cardiovascular risk assessment algorithms

    Science.gov (United States)

    2013-01-01

    Background The high burden and rising incidence of cardiovascular disease (CVD) in resource constrained countries necessitates implementation of robust and pragmatic primary and secondary prevention strategies. Many current CVD management guidelines recommend absolute cardiovascular (CV) risk assessment as a clinically sound guide to preventive and treatment strategies. Development of non-laboratory based cardiovascular risk assessment algorithms enable absolute risk assessment in resource constrained countries. The objective of this review is to evaluate the performance of existing non-laboratory based CV risk assessment algorithms using the benchmarks for clinically useful CV risk assessment algorithms outlined by Cooney and colleagues. Methods A literature search to identify non-laboratory based risk prediction algorithms was performed in MEDLINE, CINAHL, Ovid Premier Nursing Journals Plus, and PubMed databases. The identified algorithms were evaluated using the benchmarks for clinically useful cardiovascular risk assessment algorithms outlined by Cooney and colleagues. Results Five non-laboratory based CV risk assessment algorithms were identified. The Gaziano and Framingham algorithms met the criteria for appropriateness of statistical methods used to derive the algorithms and endpoints. The Swedish Consultation, Framingham and Gaziano algorithms demonstrated good discrimination in derivation datasets. Only the Gaziano algorithm was externally validated where it had optimal discrimination. The Gaziano and WHO algorithms had chart formats which made them simple and user friendly for clinical application. Conclusion Both the Gaziano and Framingham non-laboratory based algorithms met most of the criteria outlined by Cooney and colleagues. External validation of the algorithms in diverse samples is needed to ascertain their performance and applicability to different populations and to enhance clinicians’ confidence in them. PMID:24373202

  1. FLIGHT SAFETY CONTROL OF THE BASIS OF UNCERTAIN RISK EVALUATION WITH NON-ROUTINE FLIGHT CONDITIONS INVOLVED

    Directory of Open Access Journals (Sweden)

    2016-01-01

    Full Text Available The article deals with methods of forecasting the level of aviation safety operation of aircraft systems on the basis of methods of evaluation the risks of negative situations as a consequence of a functional loss of initial properties of the system with critical violations of standard modes of the aircraft. Mathematical Models of Risks as a Danger Measure of Discrete Random Events in Aviation Systems are presented. Technological Schemes and Structure of Risk Control Proce- dures without the Probability are illustrated as Methods of Risk Management System in Civil Aviation. The assessment of the level of safety and quality and management of aircraft, made not only from the standpoint of reliability (quality and consumer properties, but also from the position of ICAO on the basis of a risk-based approach. According to ICAO, the security assessment is performed by comparing the calculated risk with an acceptable level. The approach justifies the use of qualitative evaluation techniques safety in the forms of proactive forecasted and predictive risk management adverse impacts to aviation operations of various kinds, including the space sector and nuclear energy. However, for the events such as accidents and disasters, accidents with the aircraft, fighters in a training flight, during the preparation of the pilots on the training aircraft, etc. there is no required statistics. Density of probability distribution (p. d. f. of these events are only hypothetical, unknown with "hard tails" that completely eliminates the application of methods of confidence intervals in the traditional approaches to the assessment of safety in the form of the probability analysis.

  2. Conventional myelography - evaluation of risk and benefit

    International Nuclear Information System (INIS)

    Hentschel, F.

    1989-01-01

    While the benefit and methodic risk of conventional myelography (KMG) are known, a radiation risk of 0.04 to 0.9 annual radiation-induced cancers can be estimated for all inhabitants of the GDR, dependent on the investigated region and the technique used. An optimized technique can reduce the radiation burden to 50 or 25%. With comparable values of benefit and radiation risk spinal CT and KMG are not contradictory but complementary investigations. Alternative methods (MRT, US) must not be discussed from the standpoint of radiation burden, but according to their availability and their methodic limitations. (author)

  3. Evaluation methods for hospital facilities

    DEFF Research Database (Denmark)

    Fronczek-Munter, Aneta

    2013-01-01

    according to focus areas and proposes which evaluation methods to use in different building phases of healthcare facilities. Hospital evaluations with experts and users are also considered; their subjective view on space, function, technology, usability and aesthetics. Results & solutions: This paper...... presents the different methods for evaluating buildings in use in a new model, the Evaluation Focus Flower, and proposes which evaluation methods are suitable for various aims and building phases, i.e. which is giving best input for the initial briefing process of new hospital facilities with ambition...... of creating buildings with enhanced usability. Additionally various evaluation methods used in hospital cases in Denmark and Norway are presented. Involvement of users is proposed, not just in defining requirements but also in co-creation/design and evaluation of solutions. The theories and preliminary...

  4. Research on consequence analysis method for probabilistic safety assessment of nuclear fuel facilities (5). Evaluation method and trial evaluation of criticality accident

    International Nuclear Information System (INIS)

    Yamane, Yuichi; Abe, Hitoshi; Nakajima, Ken; Hayashi, Yoshiaki; Arisawa, Jun; Hayami, Satoru

    2010-01-01

    A special committee of 'Research on the analysis methods for accident consequence of nuclear fuel facilities (NFFs)' was organized by the Atomic Energy Society of Japan (AESJ) under the entrustment of Japan Atomic Energy Agency (JAEA). The committee aims to research on the state-of-the-art consequence analysis method for the Probabilistic Safety Assessment (PSA) of NFFs, such as fuel reprocessing and fuel fabrication facilities. The objectives of this research are to obtain information useful for establishing quantitative performance objectives and to demonstrate risk-informed regulation through qualifying issues needed to be resolved for applying PSA to NFFs. The research activities of the committee were mainly focused on the consequence analysis method for postulated accidents with potentially large consequences in NFFs, e.g., events of criticality, spill of molten glass, hydrogen explosion, boiling of radioactive solution and fire (including the rapid decomposition of TBP complexes), resulting in the release of radioactive materials to the environment. The results of the research were summarized in a series of six reports, which consist of a review report and five technical ones. In this report, the evaluation methods of criticality accident, such as simplified methods, one-point reactor kinetics codes and quasi-static method, were investigated and their features were summarized to provide information useful for the safety evaluation of NFFs. In addition, several trial evaluations were performed for a hypothetical scenario of criticality accident using the investigated methods, and their results were compared. The release fraction of volatile fission products in a criticality accident was also investigated. (author)

  5. Implications of commodity price risk and operating leverage on petroleum project economic evaluations

    International Nuclear Information System (INIS)

    Salahor, G.; Laughton, D.G.

    1999-01-01

    The modern asset pricing method, MAP, can provide businesses with improved tools for economic analysis. This in turn leads to greater precision in the analysis of the effects of the following parameters: project structure, time, and uncertainty. This greater precision with MAP extends to analysis of the possibility for active control of the decision alternatives for managers in the petroleum business, especially where this possibility is not questioned. A methodology is developed as a model that quantifies revenue risk based on the nature of commodity price volatility and the accepted price of risk in the commodity market. A mathematical description is included of a natural gas log-normal distribution incorporating the annual volatility in the forecast, and a measure of the rate at which volatility decreases in the long run in the forecast. Give this volatility model, a risk discount factor is determinable and applicable to the current expectation of the commodity prices at a given time, and a discount time factor of all parts of the cash flow stream. Cases are used to evaluate a natural gas development project for the purpose of yielding scenarios for capital vs. operating cost trade-offs, price risk management, production profile, and the effect of the reverting vs. non-reverting price model. In application one, a comparison is made of discounted cash flow (DCF) to MAP evaluations giving a perspective on the various development choices which a producer has through third-party service providers. Further, an example is used to compare the two methods as alternative evaluations of development alternatives to speed up or slow down the production rate and decline profile of a gas field. As in the first example, the DCF discounting is higher than the net discounting in the MAP evaluation. But in this example both methods produce the same project structure decision. The small amount of incremental capital and operating costs needed for the higher production case are

  6. Research on Comprehensive Evaluation Method for Heating Project Based on Analytic Hierarchy Processing

    Science.gov (United States)

    Han, Shenchao; Yang, Yanchun; Liu, Yude; Zhang, Peng; Li, Siwei

    2018-01-01

    It is effective to reduce haze in winter by changing the distributed heat supply system. Thus, the studies on comprehensive index system and scientific evaluation method of distributed heat supply project are essential. Firstly, research the influence factors of heating modes, and an index system with multiple dimension including economic, environmental, risk and flexibility was built and all indexes were quantified. Secondly, a comprehensive evaluation method based on AHP was put forward to analyze the proposed multiple and comprehensive index system. Lastly, the case study suggested that supplying heat with electricity has great advantage and promotional value. The comprehensive index system of distributed heating supply project and evaluation method in this paper can evaluate distributed heat supply project effectively and provide scientific support for choosing the distributed heating project.

  7. A simplified method for quantitative assessment of the relative health and safety risk of environmental management activities

    International Nuclear Information System (INIS)

    Eide, S.A.; Smith, T.H.; Peatross, R.G.; Stepan, I.E.

    1996-09-01

    This report presents a simplified method to assess the health and safety risk of Environmental Management activities of the US Department of Energy (DOE). The method applies to all types of Environmental Management activities including waste management, environmental restoration, and decontamination and decommissioning. The method is particularly useful for planning or tradeoff studies involving multiple conceptual options because it combines rapid evaluation with a quantitative approach. The method is also potentially applicable to risk assessments of activities other than DOE Environmental Management activities if rapid quantitative results are desired

  8. Inter- and intra- observer reliability of risk assessment of repetitive work without an explicit method.

    Science.gov (United States)

    Eliasson, Kristina; Palm, Peter; Nyman, Teresia; Forsman, Mikael

    2017-07-01

    A common way to conduct practical risk assessments is to observe a job and report the observed long term risks for musculoskeletal disorders. The aim of this study was to evaluate the inter- and intra-observer reliability of ergonomists' risk assessments without the support of an explicit risk assessment method. Twenty-one experienced ergonomists assessed the risk level (low, moderate, high risk) of eight upper body regions, as well as the global risk of 10 video recorded work tasks. Intra-observer reliability was assessed by having nine of the ergonomists repeat the procedure at least three weeks after the first assessment. The ergonomists made their risk assessment based on his/her experience and knowledge. The statistical parameters of reliability included agreement in %, kappa, linearly weighted kappa, intraclass correlation and Kendall's coefficient of concordance. The average inter-observer agreement of the global risk was 53% and the corresponding weighted kappa (K w ) was 0.32, indicating fair reliability. The intra-observer agreement was 61% and 0.41 (K w ). This study indicates that risk assessments of the upper body, without the use of an explicit observational method, have non-acceptable reliability. It is therefore recommended to use systematic risk assessment methods to a higher degree. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  9. PRE-MARKET CLINICAL EVALUATIONS OF INNOVATIVE HIGH-RISK MEDICAL DEVICES IN EUROPE

    DEFF Research Database (Denmark)

    Hulstaert, F.; Neyt, M.; Vinck, I.

    2012-01-01

    data are available? We studied the premarket clinical evaluation of innovative high-risk medical devices in Europe compared with the US, and with medicines, where appropriate. Methods: The literature and regulatory documents were checked. Representatives from industry, Competent Authorities, Notified...... of premarket trials in Europe and number of patients exposed, but failed as this information is not made public. Furthermore, the Helsinki Declaration is not followed with respect to the registration and publication of premarket trials. Conclusions: For innovative high-risk devices, new EU legislation should...

  10. Nonparametric evaluation of dynamic disease risk: a spatio-temporal kernel approach.

    Directory of Open Access Journals (Sweden)

    Zhijie Zhang

    Full Text Available Quantifying the distributions of disease risk in space and time jointly is a key element for understanding spatio-temporal phenomena while also having the potential to enhance our understanding of epidemiologic trajectories. However, most studies to date have neglected time dimension and focus instead on the "average" spatial pattern of disease risk, thereby masking time trajectories of disease risk. In this study we propose a new idea titled "spatio-temporal kernel density estimation (stKDE" that employs hybrid kernel (i.e., weight functions to evaluate the spatio-temporal disease risks. This approach not only can make full use of sample data but also "borrows" information in a particular manner from neighboring points both in space and time via appropriate choice of kernel functions. Monte Carlo simulations show that the proposed method performs substantially better than the traditional (i.e., frequency-based kernel density estimation (trKDE which has been used in applied settings while two illustrative examples demonstrate that the proposed approach can yield superior results compared to the popular trKDE approach. In addition, there exist various possibilities for improving and extending this method.

  11. ESTIMATING RISK ON THE CAPITAL MARKET WITH VaR METHOD

    Directory of Open Access Journals (Sweden)

    Sinisa Bogdan

    2015-06-01

    Full Text Available The two basic questions that every investor tries to answer before investment are questions about predicting return and risk. Risk and return are generally considered two positively correlated sizes, during the growth of risk it is expected increase of return to compensate the higher risk. The quantification of risk in the capital market represents the current topic since occurrence of securities. Together with estimated future returns it represents starting point of any investment. In this study it is described the history of the emergence of VaR methods, usefulness in assessing the risks of financial assets. Three main Value at Risk (VaR methodologies are decribed and explained in detail: historical method, parametric method and Monte Carlo method. After the theoretical review of VaR methods it is estimated risk of liquid stocks and portfolio from the Croatian capital market with historical and parametric VaR method, after which the results were compared and explained.

  12. Risk evaluation system for facility safeguards and security planning

    International Nuclear Information System (INIS)

    Udell, C.J.; Carlson, R.L.

    1987-01-01

    The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planing assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily

  13. Risk evaluation system for facility safeguards and security planning

    International Nuclear Information System (INIS)

    Udell, C.J.; Carlson, R.L.

    1987-01-01

    The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planning assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily

  14. Methods for evaluating imaging methods of limited reproducibility

    International Nuclear Information System (INIS)

    Krummenauer, F.

    2005-01-01

    Just like new drugs, new or modified imaging methods must be subjected to objective clinical tests, including tests on humans. In this, it must be ensured that the principle of Good Clinical Practice (GCP) are followed with regard to medical, administrative and methodical quality. Innovative methods fo clinical epidemiology and medical biometry should be applied from the planning stage to the final statistical evaluation. The author presents established and new methods for planning, evaluation and reporting of clinical tests of diagnostic methods, and especially imaging methods, in clinical medicine and illustrates these by means of current research projects in the various medical disciplines. The strategies presented are summarized in a recommendation based on the concept of phases I - IV of clinical drug testing in order to enable standardisation of the clinical evaluation of imaging methods. (orig.)

  15. Safety evaluations by means of the method use of the risk matrix in radiotherapy treatments; Evaluaciones de seguridad mediante la utilizacion del metodo de la matriz de riesgo en tratamientos de radioterapia

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, L.; Diaz, A.; Correa, T.; Gonzalez, Y., E-mail: lszamora@infomed.sld.cu [Hospital Clinico Quirurgico Hermanos Ameijeiras, San Lazaro No. 701, Centro Habana, 10400 La Habana (Cuba)

    2014-08-15

    The quality of a radiotherapy treatment is linked to multidisciplinary factors that need to be taken into account in combined form whenever an evaluation of the safety is carried out. Knowing the accidents happened in this area, and to guarantee their prevention, the causes and sequences that could behave to them should be controlled, for what is necessary to make periodic evaluations of the same one. Our objective was to carry out the safety evaluation to the treatment process of a radiotherapy service and to identify the causes and consequences that can cause these accidental exposures, for patients, worker or people, from the equipment installation until the treatment completion. The method of Risk Matrices was used, by means the SEVRRA system carried out by the Comision Nacional de Seguridad Nuclear y Salvaguardias of Mexico; this system allows to carry out a combined analysis of the occurrence frequency of the event initiator, the probability of human errors or barrier failures and the graveness of the consequences, facilitating the identification of the associated risk to the radiotherapy procedures. The method establishes priorities for the risk administration and identifies the main causes that could cause accidental exposures; also allows preventing the accidents occurrence using risk criterions that take into account the probability and magnitude of the potential exposures. This method, although does not allow to quantify numerically the risk, makes possible to classify it in levels, what is enough to establish priorities, without carrying out risks analysis but precise but more expensive. As a result we obtained that for the Co{sup 60} 77% of the treatments, is realized with low or half risk and 23% with high risk; the work load that is elevated in our case, intervenes directly in 46 initiators, in second and third place, the non realization of a portal image in the first treatment section and in the weekly continuation, as a consequences reducer, but

  16. Cumulative Risk Assessment Toolbox: Methods and Approaches for the Practitioner

    Directory of Open Access Journals (Sweden)

    Margaret M. MacDonell

    2013-01-01

    Full Text Available The historical approach to assessing health risks of environmental chemicals has been to evaluate them one at a time. In fact, we are exposed every day to a wide variety of chemicals and are increasingly aware of potential health implications. Although considerable progress has been made in the science underlying risk assessments for real-world exposures, implementation has lagged because many practitioners are unaware of methods and tools available to support these analyses. To address this issue, the US Environmental Protection Agency developed a toolbox of cumulative risk resources for contaminated sites, as part of a resource document that was published in 2007. This paper highlights information for nearly 80 resources from the toolbox and provides selected updates, with practical notes for cumulative risk applications. Resources are organized according to the main elements of the assessment process: (1 planning, scoping, and problem formulation; (2 environmental fate and transport; (3 exposure analysis extending to human factors; (4 toxicity analysis; and (5 risk and uncertainty characterization, including presentation of results. In addition to providing online access, plans for the toolbox include addressing nonchemical stressors and applications beyond contaminated sites and further strengthening resource accessibility to support evolving analyses for cumulative risk and sustainable communities.

  17. Assessment of three risk evaluation systems for patients aged ≥70 in East China: performance of SinoSCORE, EuroSCORE II and the STS risk evaluation system.

    Science.gov (United States)

    Shan, Lingtong; Ge, Wen; Pu, Yiwei; Cheng, Hong; Cang, Zhengqiang; Zhang, Xing; Li, Qifan; Xu, Anyang; Wang, Qi; Gu, Chang; Zhang, Yangyang

    2018-01-01

    To assess and compare the predictive ability of three risk evaluation systems (SinoSCORE, EuroSCORE II and the STS risk evaluation system) in patients aged ≥70, and who underwent coronary artery bypass grafting (CABG) in East China. Three risk evaluation systems were applied to 1,946 consecutive patients who underwent isolated CABG from January 2004 to September 2016 in two hospitals. Patients were divided into two subsets according to their age: elderly group (age ≥70) with a younger group (age evaluation system were 0.78(0.64)%, 1.43(1.14)% and 0.78(0.77)%, respectively. SinoSCORE achieved the best discrimination (the area under the receiver operating characteristic curve (AUC) = 0.829), followed by the STS risk evaluation system (AUC = 0.790) and EuroSCORE II (AUC = 0.769) in the entire cohort. In the elderly group, the observed mortality rate was 4.82% while it was 1.38% in the younger group. SinoSCORE (AUC = .829) also achieved the best discrimination in the elderly group, followed by the STS risk evaluation system (AUC = .730) and EuroSCORE II (AUC = 0.640) while all three risk evaluation systems all had good performances in the younger group. SinoSCORE, EuroSCORE II and the STS risk evaluation system all achieved positive calibrations in the entire cohort and subsets. The performance of the three risk evaluation systems was not ideal in the entire cohort. In the elderly group, SinoSCORE appeared to achieve better predictive efficiency than EuroSCORE II and the STS risk evaluation system.

  18. Development of an evaluation method for optimization of maintenance strategy in commercial plant

    International Nuclear Information System (INIS)

    Ito, Satoshi; Shiraishi, Natsuki; Yuki, Kazuhisa; Hashizume, Hidetoshi

    2006-01-01

    In this study, a new simulation method is developed for optimization of maintenance strategy in NPP as a multiple-objective optimization problem (MOP). The result of operation is evaluated as the average of the following three measures in 3,000 trials: Cost of Electricity (COE) as economic risk, Frequency of unplanned shutdown as plant reliability, and Unavailability of Regular Service System (RSS) and Engineering Safety Features (ESF) as safety measures. The following maintenance parameters are considered to evaluate several risk in plant operation by changing maintenance strategy: planned outage cycle, surveillance cycle, major inspection cycle, and surveillance cycle depending on the value of Fussel-Vesely importance measure. By using the Decision-Making method based on AHP, there are individual tendencies depending on individual decision-maker. Therefore this study could be useful for resolving the problem of maintenance optimization as a MOP. (author)

  19. Designing and evaluating risk-based surveillance systems

    DEFF Research Database (Denmark)

    Willeberg, Preben; Nielsen, Liza Rosenbaum; Salman, Mo

    2012-01-01

    Risk-based surveillance systems reveal occurrence of disease or infection in a sample of population units, which are selected on the basis of risk factors for the condition under study. The purpose of such systems for supporting practical animal disease policy formulations and management decisions...... with prudent use of resources while maintaining acceptable system performance. High-risk category units are selected for testing by identification of the presence of specific high-risk factor(s), while disregarding other factors that might also influence the risk. On this basis we argue that the most...... applicable risk estimate for use in designing and evaluating a risk-based surveillance system would be a crude (unadjusted) relative risk, odds ratio or apparent prevalence. Risk estimates found in the published literature, however, are often the results of multivariable analyses implicitly adjusting...

  20. Safeguards Evaluation Method for evaluating vulnerability to insider threats

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Renis, T.A.

    1986-01-01

    As protection of DOE facilities against outsiders increases to acceptable levels, attention is shifting toward achieving comparable protection against insiders. Since threats and protection measures for insiders are substantially different from those for outsiders, new perspectives and approaches are needed. One such approach is the Safeguards Evaluation Method. This method helps in assessing safeguards vulnerabilities to theft or diversion of special nuclear meterial (SNM) by insiders. The Safeguards Evaluation Method-Insider Threat is a simple model that can be used by safeguards and security planners to evaluate safeguards and proposed upgrades at their own facilities. The method is used to evaluate the effectiveness of safeguards in both timely detection (in time to prevent theft) and late detection (after-the-fact). The method considers the various types of potential insider adversaries working alone or in collusion with other insiders. The approach can be used for a wide variety of facilities with various quantities and forms of SNM. An Evaluation Workbook provides documentation of the baseline assessment; this simplifies subsequent on-site appraisals. Quantitative evaluation is facilitated by an accompanying computer program. The method significantly increases an evaluation team's on-site analytical capabilities, thereby producing a more thorough and accurate safeguards evaluation

  1. Risk identification and evaluation of customer collaboration in product development

    Directory of Open Access Journals (Sweden)

    Xuefeng Zhang

    2015-05-01

    Full Text Available Purpose: The purpose of this paper is to identify risk factors that caused by customer collaboration in new product development systematically, and propose an approach to judge which risk factors are critical and catch substantial attention. Design/methodology/approach: This study identifies risk factors according to the results of case studies of enterprises in china. On this basis, an improved rough number approach is put forward to evaluate the importance of risk factors. Findings: Firstly, classify risk factors into three aspects. Then, present a risk factor set, which include thirty-seven risk factors. At last, determine which risk factors are critical by using an improved rough number approach. Originality/value: Considering there are few researches studying comprehensive risk factors of customer collaboration and assessing them, this paper explores a risk factor set of customer collaboration in product development stage, and proposes a novel approach, which can help to solve the problem of subjective, vague and lack of prior information of evaluation, to evaluate risk factors.

  2. Fuzzy Comprehensive Evaluation of Ecological Risk Based on Cloud Model: Taking Chengchao Iron Mine as Example

    Science.gov (United States)

    Ruan, Jinghua; Chen, Yong; Xiao, Xiao; Yong, Gan; Huang, Ranran; Miao, Zuohua

    2018-01-01

    Aimed at the fuzziness and randomness during the evaluation process, this paper constructed a fuzzy comprehensive evaluation method based on cloud model. The evaluation index system was established based on the inherent risk, present level and control situation, which had been proved to be able to convey the main contradictions of ecological risk in mine on the macro level, and be advantageous for comparison among mines. The comment sets and membership functions improved by cloud model could reflect the uniformity of ambiguity and randomness effectively. In addition, the concept of fuzzy entropy was introduced to further characterize the fuzziness of assessments results and the complexities of ecological problems in target mine. A practical example in Chengchao Iron Mine evidenced that, the assessments results can reflect actual situations appropriately and provide a new theoretic guidance for comprehensive ecological risk evaluation of underground iron mine.

  3. Evaluation of creditability and risk minimisation : The effect of accounting for intangibles

    OpenAIRE

    Lukiyanov, Artem

    2005-01-01

    The recent history knows numerous examples of creditor’s inability to evaluate financial solvency of the client correctly. Creditors’ risks do not only concern individual relations between the two parties but the economy in general. The standard loan-giving procedure considers evaluation based on a number of financial ratios. Using the standard method a company that in reality is creditable may sometimes be counted as insolvent by the bank – due to the structure of the balance sheet, for inst...

  4. Methods for Evaluating the Performance and Human Stress-Factors of Percussive Riveting

    Science.gov (United States)

    Ahn, Jonathan Y.

    The aerospace industry automates portions of their manufacturing and assembly processes. However, mechanics still remain vital to production, especially in areas where automated machines cannot fit, or have yet to match the quality of human craftsmanship. One such task is percussive riveting. Because percussive riveting is associated with a high risk of injury, these tool must be certified prior to release. The major contribution of this thesis is to develop a test bench capable of percussive riveting for ergonomic evaluation purposes. The major issues investigated are: (i) automate the tool evaluation method to be repeatable; (ii) demonstrate use of displacement and force sensors; and (iii) correlate performance and risk exposure of percussive tools. A test bench equipped with servomotors and pneumatic cylinders to control xyz-position of a rivet gun and bucking bar simultaneously, is used to explore this evaluation approach.

  5. Evaluation of ergonomic physical risk factors in a truck manufacturing plant: case study in SCANIA Production Angers.

    Science.gov (United States)

    Zare, Mohsen; Malinge-Oudenot, Agnes; Höglund, Robert; Biau, Sophie; Roquelaure, Yves

    2016-01-01

    The aims of this study were 1) to assess the ergonomic physical risk factors from practitioner's viewpoint in a truck assembly plant with an in-house observational method and the NIOSH lifting equation, and 2) to compare the results of both methods and their differences. The in-house ergonomic observational method for truck assembly i.e. the SCANIA Ergonomics Standard (SES) and the NIOSH lifting equation were applied to evaluate physical risk factors and lifting of loads by operators. Both risk assessment approaches revealed various levels of risk, ranging from low to high. Two workstations were identified by the SES method as high risk. The NIOSH lifting index (LI) was greater than two for four lifting tasks. The results of the SES method disagreed with the NIOSH lifting equation for lifting tasks. Moreover, meaningful variations in ergonomic risk patterns were found for various truck models at each workstation. These results provide a better understanding of the physical ergonomic exposure from practitioner's point of view in the automotive assembly plant.

  6. The additivity of radionuclide and chemical risk estimates in performance evaluation of mixed-waste sites

    International Nuclear Information System (INIS)

    Till, J.E.; Meyer, K.R.

    1990-01-01

    Methods for assessing radioactive waste sites that contain chemical constituents are in the formative stages. In evaluating these sites, a key concern will be the hazard to personnel involved in cleanup work and to the general population. This paper focuses on what we have learned from pathway analysis and risk assessment about providing a combined estimate of risk from exposure to both chemicals and radionuclides. Quantitative radiation risk assessment involves a high degree of uncertainty. Chemical risk assessment generally does not provide quantitative results. Thus, it is not currently possible to develop a useful, quantitative combined risk assessment for mixed-waste sites

  7. A study for the practical methods and evaluations for the on-line maintenance

    International Nuclear Information System (INIS)

    Chigusa, Naoki; Ogami, Takahiro

    2010-01-01

    For planning and enforcing the On Line Maintenance (OLM) in the near future, we should take care of keeping a reasonable balance between the degree of risk increase and the task volume equalization. In this paper, the current status of studying for the OLM introducing on Japanese utilities is described. The planning approach of OLM is examined on the assumption that planned OLM can be carried out. The practical methods and evaluations for the OLM are described, and the trial evaluation for this method is also described. (author)

  8. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    Science.gov (United States)

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. A method for screening for the risk of chronic effects of surface water pollution.

    Science.gov (United States)

    Soldán, Přemysl; Badurová, Jana

    2013-01-01

    The article describes a method for screening for the risk of chronic surface water pollution which was developed at the T. G. Masaryk Water Research Institute. The approach, which is based on exotoxicological analyses, can be classed as a rapid method of assessment. The degree of risk of chronic effects surface water pollution is determined from an evaluation of two major parameters-toxicity and genotoxicity. As the method utilizes relative simple procedures for sample collection, pretreatment of the sample, chemical analyses, bioassays and results assessment, this approach is suitable for widespread practical use. Extensive utilization of this approach for assessing river basins in the Czech Republic has proved its suitability for a more sophisticated detection of the biological impact of surface water pollution. This is documented in the article where the method is used in a study of the Bílina River, and in the overview of the results of the risk assessment of chronic effects of surface water pollution in selected sections of three international river basins in the Czech Republic.

  10. Risk-benefit evaluation for large technological systems

    International Nuclear Information System (INIS)

    Okrent, D.

    1979-01-01

    The related topics of risk-benefit analysis, risk analysis, and risk-acceptance criteria (How safe is safe enough) are of growing importance. An interdisciplinary study on various aspects of these topics, including applications to nuclear power, was recently completed at the University of California, Los Angeles (UCLA), with the support of the National Science Foundation. In addition to more than 30 topical reports and various open-literature publications, a final report (UCLA-ENG-7777) to the study, titled ''A Generalized Evaluation Approach to Risk--Benefit for Large Technological Systems and Its Application to Nuclear Power'', was issued in early 1978. This article briefly summarizes portions of the final report dealing with general aspects of risk-benefit methodology, societal knowledge and perception of risk, and risk-acceptance criteria

  11. EVALUATING RISK-PREDICTION MODELS USING DATA FROM ELECTRONIC HEALTH RECORDS.

    Science.gov (United States)

    Wang, L E; Shaw, Pamela A; Mathelier, Hansie M; Kimmel, Stephen E; French, Benjamin

    2016-03-01

    The availability of data from electronic health records facilitates the development and evaluation of risk-prediction models, but estimation of prediction accuracy could be limited by outcome misclassification, which can arise if events are not captured. We evaluate the robustness of prediction accuracy summaries, obtained from receiver operating characteristic curves and risk-reclassification methods, if events are not captured (i.e., "false negatives"). We derive estimators for sensitivity and specificity if misclassification is independent of marker values. In simulation studies, we quantify the potential for bias in prediction accuracy summaries if misclassification depends on marker values. We compare the accuracy of alternative prognostic models for 30-day all-cause hospital readmission among 4548 patients discharged from the University of Pennsylvania Health System with a primary diagnosis of heart failure. Simulation studies indicate that if misclassification depends on marker values, then the estimated accuracy improvement is also biased, but the direction of the bias depends on the direction of the association between markers and the probability of misclassification. In our application, 29% of the 1143 readmitted patients were readmitted to a hospital elsewhere in Pennsylvania, which reduced prediction accuracy. Outcome misclassification can result in erroneous conclusions regarding the accuracy of risk-prediction models.

  12. Environmental risk assessment for plant pests: a procedure to evaluate their impacts on ecosystem services

    DEFF Research Database (Denmark)

    Gilioli, G.; Schrader, G.; Baker, R.H.A.

    2014-01-01

    and temporal resolution is then used to explore how an IAS, as an exogenous driving force, may trigger modifications in the target environment. The method presented here provides a standardized approach to generate comparable and reproducible results for environmental risk assessment as a component of Pest...... Risk Analysis. The method enables the assessment of overall environmental risk which integrates the impacts on different components of the environment and their probabilities of occurrence. The application of the proposed scheme is illustrated by evaluating the environmental impacts of the invasive......The current methods to assess the environmental impacts of plant pests differ in their approaches and there is a lack of the standardized procedures necessary to provide accurate and consistent results, demonstrating the complexity of developing a commonly accepted scheme for this purpose...

  13. Analysis of risk of nonconformities and applied quality inspection methods in the process of aluminium profiles coating based on FMEA results

    OpenAIRE

    Krzysztof Knop

    2017-01-01

    The article presents the results of risk analysis associated with nonconformities of aluminium profiles in the process of coating and quality inspection methods used to their detection. Analysis of risk was done based on results of FMEA method. Evaluated quality inspection methods were distinguished based on the term of inspection in the ISO 9000:2005 norm. Manufacturing process of aluminium profile in micro-technological approach was presented. Triple quantification of nonconformities risk b...

  14. Research on Liquidity Risk Evaluation of Chinese A-Shares Market Based on Extension Theory

    Science.gov (United States)

    Bai-Qing, Sun; Peng-Xiang, Liu; Lin, Zhang; Yan-Ge, Li

    This research defines the liquidity risk of stock market in matter-element theory and affair-element theory, establishes the indicator system of the forewarning for liquidity risks,designs the model and the process of early warning using the extension set method, extension dependent function and the comprehensive evaluation model. And the paper studies empirically A-shares market through the data of 1A0001, which prove that the model can better describe liquidity risk of China’s A-share market. At last, it gives the corresponding policy recommendations.

  15. SOCIAL STABILITY AND HIV RISK BEHAVIOR: EVALUATING THE ROLE OF ACCUMULATED VULNERABILITY

    Science.gov (United States)

    German, Danielle; Latkin, Carl A.

    2011-01-01

    This study evaluated a cumulative and syndromic relationship among commonly co-occurring vulnerabilites (homelessness, incarceration, low-income, residential transition) in association with HIV-related risk behaviors among 635 low-income women in Baltimore. Analysis included descriptive statistics, logistic regression, latent class analysis and latent class regression. Both methods of assessing multidimensional instability showed significant associations with risk indicators. Risk of multiple partners, sex exchange, and drug use decreased significantly with each additional domain. Higher stability class membership (77%) was associated with decreased likelihood of multiple partners, exchange partners, recent drug use, and recent STI. Multidimensional social vulnerabilities were cumulatively and synergistically linked to HIV risk behavior. Independent instability measures may miss important contextual determinants of risk. Social stability offers a useful framework to understand the synergy of social vulnerabilities that shape sexual risk behavior. Social policies and programs aiming to enhance housing and overall social stability are likely to be beneficial for HIV prevention. PMID:21259043

  16. Fundamentals of risk management understanding, evaluating and implementing effective risk management

    CERN Document Server

    Hopkin, Paul

    2012-01-01

    Now more than ever, organizations must plan, response and recognize all forms of risks that they face. "Fundamentals of Risk Management", now in its second edition, provides a comprehensive introduction to the subject of commercial and business risk for anyone studying for a career in risk as well as a broad range of risk professionals. It examines the key components of risk management and its application with examples to demonstrate its benefit to organisations in the public and private sector. The second edition has been completely updated to take into account the greater influence of ISO 3100, the emergence of Governance Risk and Compliance (GRC) and the wide use of the bowtie method to illustrate risk management. In addition, there is now a chapter on the skills and competencies required by an effective risk manager.

  17. Evaluation of allowed outage times (AOTS) from a risk and reliability standpoint

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1989-08-01

    This report describes the basic risks associated with allowed outage times (AOTS), defines strategies for selecting the risks to be quantified, and describes how the risks can be quantified. This report provides a basis for risk-based approaches for regulatory and plant implementation. The AOT risk evaluations can be applied to proposed one-time AOT changes, or to permanent changes. The evaluations can also be used to quantify risks associated with present AOTs, and in establishing AOTs from a risk perspective. The report shows that the standard way of calculating AOT risks in probabilistic risk analyses (PRAs) generally is not sufficient when evaluating all the risks associated with an AOT in order to assess its acceptability. The PRA calculates an average AOT risk which includes the frequency at which the AOT is expected to occur. Other risks associated with an AOT include the single downtime risk, which is the risk incurred when (given) the AOT has occurred. The single downtime risk is generally the most applicable risk in determining the acceptability of the AOT. The single downtime risks are generally much larger than the PRA-averaged risk. For more comprehensive evaluations, both risks should be calculated. The report also describes other risks which can be considered, including personnel and economic risks. Finally, the report discusses the detailed evaluations which are involved in calculating AOT risks, including considerations of uncertainty. (author)

  18. Cancer risks, risk-cost-benefit analyses, and the scientific method

    International Nuclear Information System (INIS)

    Seiler, F.A.; Alvarez, J.L.

    1995-01-01

    Two main changes in risk analysis are increasingly beginning to influence the manner in which, in the perception of scientists, low-dose modeling of radiation carcinogenesis is supposed to be done. In the past, efforts to model radiation risks have been carried out under the banner of scientific endeavors. On closer inspection, however, it has become obvious that these efforts were not guided by the scientific method and that a change in approach is needed. We realize increasingly that risk analysis is not done in a vacuum and that any action taken due to the result of the analysis not only has a benefit in the form of a risk reduction but leads inevitably to an increase in cost and an increase in the risks of persons effecting the benefit. Thus, a risk-cost-benefit analysis should be done and show a clear-cut net benefit before a remedial action is taken

  19. Comparison of methods for prioritizing risk in radiation oncology; Comparacao entre metodos de priorizacao de riscos em radioterapia

    Energy Technology Data Exchange (ETDEWEB)

    Biazoto, Bruna; Tokarski, Marcio, E-mail: bruna@ceb.unicamp.br [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Centro de Engenharia Biomedica

    2016-07-01

    Proactive risk management tools, such as Failure Mode and Effect Analysis (FEMA), were imported from engineering and have been widely used in Radiation Oncology. An important step in this process is the risk prioritization and there are many methods to do that. This paper compares the risk prioritization of computerized planning phase in interstitial implants with high dose rate brachytherapy performed with Health Care Failure Mode and Effect Analysis (HFMEA) and FMEA with guidelines given by the Task Group 100 (TG 100) of the American Association of Physicists in Medicine. Out of the 33 possible failure modes of this process, 21 require more attention when evaluated by HFMEA and 22, when evaluated by FMEA TG 100. Despite the high coincidence between the methods, the execution of HFMEA was simpler. (author)

  20. An evaluation of automatic coronary artery calcium scoring methods with cardiac CT using the orCaScore framework.

    Science.gov (United States)

    Wolterink, Jelmer M; Leiner, Tim; de Vos, Bob D; Coatrieux, Jean-Louis; Kelm, B Michael; Kondo, Satoshi; Salgado, Rodrigo A; Shahzad, Rahil; Shu, Huazhong; Snoeren, Miranda; Takx, Richard A P; van Vliet, Lucas J; van Walsum, Theo; Willems, Tineke P; Yang, Guanyu; Zheng, Yefeng; Viergever, Max A; Išgum, Ivana

    2016-05-01

    The amount of coronary artery calcification (CAC) is a strong and independent predictor of cardiovascular disease (CVD) events. In clinical practice, CAC is manually identified and automatically quantified in cardiac CT using commercially available software. This is a tedious and time-consuming process in large-scale studies. Therefore, a number of automatic methods that require no interaction and semiautomatic methods that require very limited interaction for the identification of CAC in cardiac CT have been proposed. Thus far, a comparison of their performance has been lacking. The objective of this study was to perform an independent evaluation of (semi)automatic methods for CAC scoring in cardiac CT using a publicly available standardized framework. Cardiac CT exams of 72 patients distributed over four CVD risk categories were provided for (semi)automatic CAC scoring. Each exam consisted of a noncontrast-enhanced calcium scoring CT (CSCT) and a corresponding coronary CT angiography (CCTA) scan. The exams were acquired in four different hospitals using state-of-the-art equipment from four major CT scanner vendors. The data were divided into 32 training exams and 40 test exams. A reference standard for CAC in CSCT was defined by consensus of two experts following a clinical protocol. The framework organizers evaluated the performance of (semi)automatic methods on test CSCT scans, per lesion, artery, and patient. Five (semi)automatic methods were evaluated. Four methods used both CSCT and CCTA to identify CAC, and one method used only CSCT. The evaluated methods correctly detected between 52% and 94% of CAC lesions with positive predictive values between 65% and 96%. Lesions in distal coronary arteries were most commonly missed and aortic calcifications close to the coronary ostia were the most common false positive errors. The majority (between 88% and 98%) of correctly identified CAC lesions were assigned to the correct artery. Linearly weighted Cohen's kappa

  1. 31 CFR 223.11 - Limitation of risk: Protective methods.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Limitation of risk: Protective methods. 223.11 Section 223.11 Money and Finance: Treasury Regulations Relating to Money and Finance... BUSINESS WITH THE UNITED STATES § 223.11 Limitation of risk: Protective methods. The limitation of risk...

  2. Nanoparticle risk management and cost evaluation: a general framework

    Science.gov (United States)

    Fleury, Dominique; Bomfim, João A. S.; Metz, Sébastien; Bouillard, Jacques X.; Brignon, Jean-Marc

    2011-07-01

    Industrial production of nano-objects has been growing fast during the last decade and a wide range of products containing nanoparticles (NPs) is proposed to the public in various markets (automotive, electronics, textiles...). The issues encountered in monitoring the presence of nano-objects in any media cause a major difficulty for controlling the risk associated to the production stage. It is therefore very difficult to assess the efficiency of prevention and mitigation solutions, which potentially leads to overestimate the level of the protection barriers that are recommended. The extra costs in adding nano-objects to the process, especially that of nanosafety, must be estimated and optimized to ensure the competitiveness of the future production lines and associated products. The risk management and cost evaluation methods presented herein have been designed for application in a pilot production line of injection-moulded nanocomposites.

  3. Nanoparticle risk management and cost evaluation: a general framework

    International Nuclear Information System (INIS)

    Fleury, Dominique; Metz, Sebastien; Bouillard, Jacques X; Brignon, Jean-Marc; Bomfim, Joao A S

    2011-01-01

    Industrial production of nano-objects has been growing fast during the last decade and a wide range of products containing nanoparticles (NPs) is proposed to the public in various markets (automotive, electronics, textiles...). The issues encountered in monitoring the presence of nano-objects in any media cause a major difficulty for controlling the risk associated to the production stage. It is therefore very difficult to assess the efficiency of prevention and mitigation solutions, which potentially leads to overestimate the level of the protection barriers that are recommended. The extra costs in adding nano-objects to the process, especially that of nanosafety, must be estimated and optimized to ensure the competitiveness of the future production lines and associated products. The risk management and cost evaluation methods presented herein have been designed for application in a pilot production line of injection-moulded nanocomposites.

  4. Reliability and risk analysis methods research plan

    International Nuclear Information System (INIS)

    1984-10-01

    This document presents a plan for reliability and risk analysis methods research to be performed mainly by the Reactor Risk Branch (RRB), Division of Risk Analysis and Operations (DRAO), Office of Nuclear Regulatory Research. It includes those activities of other DRAO branches which are very closely related to those of the RRB. Related or interfacing programs of other divisions, offices and organizations are merely indicated. The primary use of this document is envisioned as an NRC working document, covering about a 3-year period, to foster better coordination in reliability and risk analysis methods development between the offices of Nuclear Regulatory Research and Nuclear Reactor Regulation. It will also serve as an information source for contractors and others to more clearly understand the objectives, needs, programmatic activities and interfaces together with the overall logical structure of the program

  5. The Method of Validity Evaluation of Hard Coal Excavation in Residual Seam Parts

    Science.gov (United States)

    Wodarski, Krzysztof; Bijańska, Jolanta; Gumiński, Adam

    2017-12-01

    The excavation of residual seam parts should be justified by positive assessment of the purposefulness, technical feasibility and economic effectiveness. The results of the profitability evaluation are crucial in a decision making process. The excavation of residual seam parts, even if it is possible from a technical point of view, should not be implemented if it is economically inefficient or when accompanied by a very high risk of non-recovery of invested capital resources. The article presents the evaluation method of possibilities of excavating hard coal from residual seam parts, and the example of its use in one of collieries in the Upper Silesian Coal Basin. Working in line with the developed method, allows to indicate the variant of residual seam part exploitation, which is feasible to implement from a technical point of view, and which is characterized by the highest economic effectiveness and lowest risk.

  6. Market Microstructure Effects on Firm Default Risk Evaluation

    Directory of Open Access Journals (Sweden)

    Flavia Barsotti

    2016-07-01

    Full Text Available Default probability is a fundamental variable determining the credit worthiness of a firm and equity volatility estimation plays a key role in its evaluation. Assuming a structural credit risk modeling approach, we study the impact of choosing different non parametric equity volatility estimators on default probability evaluation, when market microstructure noise is considered. A general stochastic volatility framework with jumps for the underlying asset dynamics is defined inside a Merton-like structural model. To estimate the volatility risk component of a firm we use high-frequency equity data: market microstructure noise is introduced as a direct effect of observing noisy high-frequency equity prices. A Monte Carlo simulation analysis is conducted to (i test the performance of alternative non-parametric equity volatility estimators in their capability of filtering out the microstructure noise and backing out the true unobservable asset volatility; (ii study the effects of different non-parametric estimation techniques on default probability evaluation. The impact of the non-parametric volatility estimators on risk evaluation is not negligible: a sensitivity analysis defined for alternative values of the leverage parameter and average jumps size reveals that the characteristics of the dataset are crucial to determine which is the proper estimator to consider from a credit risk perspective.

  7. SU-E-T-316: The Design of a Risk Index Method for 3D Patient Specific QA

    Energy Technology Data Exchange (ETDEWEB)

    Cho, W; Wu, H [Seoul National University Hospital, Seoul (Korea, Republic of); Xing, L [Stanford University, Stanford, CA (United States); Suh, T [Catholic UniversityMedical College, Seoul (Korea, Republic of)

    2014-06-01

    Purpose: To suggest a new guidance for the evaluation of 3D patient specific QA, a structure-specific risk-index (RI) method was designed and implemented. Methods: A new algorithm was designed to assign the score of Pass, Fail or Pass with Risk to all 3D voxels in each structure by improving a conventional Gamma Index (GI) algorithm, which implied the degree of the risk of under-dose to the treatment target or over-dose to the organ at risks (OAR). Structure-specific distance to agreement (DTOA), dose difference and minimum checkable dose were applied to the GI algorithm, and additional parameters such as dose gradient factor and dose limit of structures were used to the RI method. Maximum passing rate (PR) and minimum PR were designed and calculated for each structure with the RI method. 3D doses were acquired from a spine SBRT plan by simulating the shift of beam iso-center, and tested to show the feasibility of the suggested method. Results: When the iso-center was shifted by 1 mm, 2 mm, and 3 mm, the PR of conventional GI method between shifted and non-shifted 3D doses were 99.9%, 97.4%, and 89.7% for PTV, 99.8%, 84.8%, and 63.2% for spinal cord, and 100%, 99.5%, 91.7% for right lung. The minimum PRs from the RI method were 98.9%, 96.9%, and 89.5% for PTV, and 96.1%, 79.3%, 57.5% for spinal cord, and 92.5%, 92.0%, 84.4% for right lung, respectively. The maximum PRs from the RI method were equal or less than the PRs from the conventional GI evaluation. Conclusion: Designed 3D RI method showed more strict acceptance level than the conventional GI method, especially for OARs. The RI method is expected to give the degrees of risks in the delivered doses, as well as the degrees of agreements between calculated 3D doses and measured (or simulated) 3D doses.

  8. SU-E-T-316: The Design of a Risk Index Method for 3D Patient Specific QA

    International Nuclear Information System (INIS)

    Cho, W; Wu, H; Xing, L; Suh, T

    2014-01-01

    Purpose: To suggest a new guidance for the evaluation of 3D patient specific QA, a structure-specific risk-index (RI) method was designed and implemented. Methods: A new algorithm was designed to assign the score of Pass, Fail or Pass with Risk to all 3D voxels in each structure by improving a conventional Gamma Index (GI) algorithm, which implied the degree of the risk of under-dose to the treatment target or over-dose to the organ at risks (OAR). Structure-specific distance to agreement (DTOA), dose difference and minimum checkable dose were applied to the GI algorithm, and additional parameters such as dose gradient factor and dose limit of structures were used to the RI method. Maximum passing rate (PR) and minimum PR were designed and calculated for each structure with the RI method. 3D doses were acquired from a spine SBRT plan by simulating the shift of beam iso-center, and tested to show the feasibility of the suggested method. Results: When the iso-center was shifted by 1 mm, 2 mm, and 3 mm, the PR of conventional GI method between shifted and non-shifted 3D doses were 99.9%, 97.4%, and 89.7% for PTV, 99.8%, 84.8%, and 63.2% for spinal cord, and 100%, 99.5%, 91.7% for right lung. The minimum PRs from the RI method were 98.9%, 96.9%, and 89.5% for PTV, and 96.1%, 79.3%, 57.5% for spinal cord, and 92.5%, 92.0%, 84.4% for right lung, respectively. The maximum PRs from the RI method were equal or less than the PRs from the conventional GI evaluation. Conclusion: Designed 3D RI method showed more strict acceptance level than the conventional GI method, especially for OARs. The RI method is expected to give the degrees of risks in the delivered doses, as well as the degrees of agreements between calculated 3D doses and measured (or simulated) 3D doses

  9. Approved Risk Evaluation and Mitigation Strategies

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Food and Drug Administration Amendments Act of 2007 gave FDA the authority to require a Risk Evaluation and Mitigation Strategy (REMS) from manufacturers to...

  10. Discount method for programming language evaluation

    DEFF Research Database (Denmark)

    Kurtev, Svetomir; Christensen, Tommy Aagaard; Thomsen, Bent

    2016-01-01

    This paper presents work in progress on developing a Discount Method for Programming Language Evaluation inspired by the Discount Usability Evaluation method (Benyon 2010) and the Instant Data Analysis method (Kjeldskov et al. 2004). The method is intended to bridge the gap between small scale...... internal language design evaluation methods and large scale surveys and quantitative evaluation methods. The method is designed to be applicable even before a compiler or IDE is developed for a new language. To test the method, a usability evaluation experiment was carried out on the Quorum programming...... language (Stefik et al. 2016) using programmers with experience in C and C#. When comparing our results with previous studies of Quorum, most of the data was comparable though not strictly in agreement. However, the discrepancies were mainly related to the programmers pre-existing expectations...

  11. Analysis of risk of nonconformities and applied quality inspection methods in the process of aluminium profiles coating based on FMEA results

    Directory of Open Access Journals (Sweden)

    Krzysztof Knop

    2017-10-01

    Full Text Available The article presents the results of risk analysis associated with nonconformities of aluminium profiles in the process of coating and quality inspection methods used to their detection. Analysis of risk was done based on results of FMEA method. Evaluated quality inspection methods were distinguished based on the term of inspection in the ISO 9000:2005 norm. Manufacturing process of aluminium profile in micro-technological approach was presented. Triple quantification of nonconformities risk based on the FMEA method by using three different approaches was conducted. Analysis of nonconformities risks associated with the use of specific quality inspection methods was done. In the last part the analysis of causes of critical nonconformities, proposals for improvement actions reducing the risk of the critical nonconformities and applied critical quality inspection method were showed.

  12. Missing in space: an evaluation of imputation methods for missing data in spatial analysis of risk factors for type II diabetes.

    Science.gov (United States)

    Baker, Jannah; White, Nicole; Mengersen, Kerrie

    2014-11-20

    Spatial analysis is increasingly important for identifying modifiable geographic risk factors for disease. However, spatial health data from surveys are often incomplete, ranging from missing data for only a few variables, to missing data for many variables. For spatial analyses of health outcomes, selection of an appropriate imputation method is critical in order to produce the most accurate inferences. We present a cross-validation approach to select between three imputation methods for health survey data with correlated lifestyle covariates, using as a case study, type II diabetes mellitus (DM II) risk across 71 Queensland Local Government Areas (LGAs). We compare the accuracy of mean imputation to imputation using multivariate normal and conditional autoregressive prior distributions. Choice of imputation method depends upon the application and is not necessarily the most complex method. Mean imputation was selected as the most accurate method in this application. Selecting an appropriate imputation method for health survey data, after accounting for spatial correlation and correlation between covariates, allows more complete analysis of geographic risk factors for disease with more confidence in the results to inform public policy decision-making.

  13. Evaluation of soil erosion risk using Analytic Network Process and GIS: a case study from Spanish mountain olive plantations.

    Science.gov (United States)

    Nekhay, Olexandr; Arriaza, Manuel; Boerboom, Luc

    2009-07-01

    The study presents an approach that combined objective information such as sampling or experimental data with subjective information such as expert opinions. This combined approach was based on the Analytic Network Process method. It was applied to evaluate soil erosion risk and overcomes one of the drawbacks of USLE/RUSLE soil erosion models, namely that they do not consider interactions among soil erosion factors. Another advantage of this method is that it can be used if there are insufficient experimental data. The lack of experimental data can be compensated for through the use of expert evaluations. As an example of the proposed approach, the risk of soil erosion was evaluated in olive groves in Southern Spain, showing the potential of the ANP method for modelling a complex physical process like soil erosion.

  14. Comparison of cluster-based and source-attribution methods for estimating transmission risk using large HIV sequence databases.

    Science.gov (United States)

    Le Vu, Stéphane; Ratmann, Oliver; Delpech, Valerie; Brown, Alison E; Gill, O Noel; Tostevin, Anna; Fraser, Christophe; Volz, Erik M

    2018-06-01

    Phylogenetic clustering of HIV sequences from a random sample of patients can reveal epidemiological transmission patterns, but interpretation is hampered by limited theoretical support and statistical properties of clustering analysis remain poorly understood. Alternatively, source attribution methods allow fitting of HIV transmission models and thereby quantify aspects of disease transmission. A simulation study was conducted to assess error rates of clustering methods for detecting transmission risk factors. We modeled HIV epidemics among men having sex with men and generated phylogenies comparable to those that can be obtained from HIV surveillance data in the UK. Clustering and source attribution approaches were applied to evaluate their ability to identify patient attributes as transmission risk factors. We find that commonly used methods show a misleading association between cluster size or odds of clustering and covariates that are correlated with time since infection, regardless of their influence on transmission. Clustering methods usually have higher error rates and lower sensitivity than source attribution method for identifying transmission risk factors. But neither methods provide robust estimates of transmission risk ratios. Source attribution method can alleviate drawbacks from phylogenetic clustering but formal population genetic modeling may be required to estimate quantitative transmission risk factors. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  15. New methods for fall risk prediction.

    Science.gov (United States)

    Ejupi, Andreas; Lord, Stephen R; Delbaere, Kim

    2014-09-01

    Accidental falls are the leading cause of injury-related death and hospitalization in old age, with over one-third of the older adults experiencing at least one fall or more each year. Because of limited healthcare resources, regular objective fall risk assessments are not possible in the community on a large scale. New methods for fall prediction are necessary to identify and monitor those older people at high risk of falling who would benefit from participating in falls prevention programmes. Technological advances have enabled less expensive ways to quantify physical fall risk in clinical practice and in the homes of older people. Recently, several studies have demonstrated that sensor-based fall risk assessments of postural sway, functional mobility, stepping and walking can discriminate between fallers and nonfallers. Recent research has used low-cost, portable and objective measuring instruments to assess fall risk in older people. Future use of these technologies holds promise for assessing fall risk accurately in an unobtrusive manner in clinical and daily life settings.

  16. A Quantitative Measure For Evaluating Project Uncertainty Under Variation And Risk Effects

    Directory of Open Access Journals (Sweden)

    A. Chenarani

    2017-10-01

    Full Text Available The effects of uncertainty on a project and the risk event as the consequence of uncertainty are analyzed. The uncertainty index is proposed as a quantitative measure for evaluating the uncertainty of a project. This is done by employing entropy as the indicator of system disorder and lack of information. By employing this index, the uncertainty of each activity and its increase due to risk effects as well as project uncertainty changes as a function of time can be assessed. The results are implemented and analyzed for a small turbojet engine development project as the case study. The results of this study can be useful for project managers and other stakeholders for selecting the most effective risk management and uncertainty controlling method.

  17. Quantitative Risk Analysis: Method And Process

    Directory of Open Access Journals (Sweden)

    Anass BAYAGA

    2010-03-01

    Full Text Available Recent and past studies (King III report, 2009: 73-75; Stoney 2007;Committee of Sponsoring Organisation-COSO, 2004, Bartell, 2003; Liebenberg and Hoyt, 2003; Reason, 2000; Markowitz 1957 lament that although, the introduction of quantifying risk to enhance degree of objectivity in finance for instance was quite parallel to its development in the manufacturing industry, it is not the same in Higher Education Institution (HEI. In this regard, the objective of the paper was to demonstrate the methods and process of Quantitative Risk Analysis (QRA through likelihood of occurrence of risk (phase I. This paper serves as first of a two-phased study, which sampled hundred (100 risk analysts in a University in the greater Eastern Cape Province of South Africa.The analysis of likelihood of occurrence of risk by logistic regression and percentages were conducted to investigate whether there were a significant difference or not between groups (analyst in respect of QRA.The Hosmer and Lemeshow test was non-significant with a chi-square(X2 =8.181; p = 0.300, which indicated that there was a good model fit, since the data did not significantly deviate from the model. The study concluded that to derive an overall likelihood rating that indicated the probability that a potential risk may be exercised within the construct of an associated threat environment, the following governing factors must be considered: (1 threat source motivation and capability (2 nature of the vulnerability (3 existence and effectiveness of current controls (methods and process.

  18. Usability of the Upper Limb Risk Assessment (UPLIRA Method for Assessing the Risk Factors of Upper Limb Disorders

    Directory of Open Access Journals (Sweden)

    Abd Razak Noor Syafiqa

    2017-01-01

    Full Text Available It is important to design ergonomic methods or assessment with a high usability and good ergonomic features, so the method is easily adaptable to the task and the workplace environment. Usability is a measurement on how well the user can use that functionality. The study converged on testing the usability of the new tools for assessing ULDs namely as Upper Limb Risk Assessment (UPLIRA. The UPLIRA method was evaluated by 6 students (3 undergraduate students and 3 postgraduates students from University Tun Hussein Onn Malaysia (UTHM who are conducting research in ergonomic. From the feedback survey of UPLIRA method, the observers agree that the prototype of UPLIRA tool was applicable to workplace assessment for the wide range of jobs/task (mean 4.00, SD:0.632 with 83% percentage of agreement . They also indicate that UPLIRA method is quick to use (mean 3.67, SD:1.033 with percentage agreement of 67%. The scoring system and action level was rated as easy to understand (mean 3.67, SD:1.211 and (mean 4.17, SD:0.408. Conclusively, the UPLIRA method was rated as straightforward to use, applicable to wide range of tasks, and time saving as assessment can be completed within 10 minutes. In addition, the UPLIRA assessment covers an extensive range of physical, psychosocial, work organizational, and individual risk factors.

  19. Dysphagia after vertical sleeve gastrectomy: Evaluation of risk factors and assessment of endoscopic intervention

    OpenAIRE

    Nath, Anand; Yewale, Sayali; Tran, Tung; Brebbia, John S; Shope, Timothy R; Koch, Timothy R

    2016-01-01

    AIM To evaluate the risks of medical conditions, evaluate gastric sleeve narrowing, and assess hydrostatic balloon dilatation to treat dysphagia after vertical sleeve gastrectomy (VSG). METHODS VSG is being performed more frequently worldwide as a treatment for medically-complicated obesity, and dysphagia is common post-operatively. We hypothesize that post-operative dysphagia is related to underlying medical conditions or narrowing of the gastric sleeve. This is a retrospective, single insti...

  20. Opinions of Nurses About the Evaluation of Risk of Falling Among Inpatients.

    Science.gov (United States)

    Atay, Selma; Vurur, Sevda; Erdugan, Necla

    Patient falls and fall-related injuries are an important problem for patients, relatives, caregivers, and the health system at large. This study aims to identify opinions of nurses about the risk of falling among patients staying in hospitals. This study uses a qualitative descriptive design and employs a semistructured interview method to identify the opinions and experiences of nurses about patient falls. This study evaluated the opinions of a total of 12 staff nurses. It was found that nurses consider patients in the postoperative period to be most prone to falls. They think that most falls take place during transfers and that the medical diagnosis of the patient plays a crucial role in fall incidents. The most important problem associated with patient falls was symptoms of traumatic brain injury. According to the participating nurses, the risk of fall for every patient should be evaluated upon admission. Measures that the nurses take against patient falls include raising the bed's side rails and securing the bed brakes. The findings of this research suggest that in-service training programs about the evaluation of the risk of falling should be organized for nurses. Guidelines should be developed for patients with different levels of risk of falling. It is suggested that nurses should be in charge of training patients who are conscious, their relatives, and caregiver personnel. The training of nurses and caregivers helps to prevent the falls of inpatients.

  1. Risk and dose assessment methods in gamma knife QA

    International Nuclear Information System (INIS)

    Banks, W.W.; Jones, E.D.; Rathbun, P.

    1992-10-01

    Traditional methods used in assessing risk in nuclear power plants may be inappropriate to use in assessing medical radiation risks. The typical philosophy used in assessing nuclear reactor risks is machine dominated with only secondary attention paid to the human component, and only after critical machine failure events have been identified. In assessing the risk of a misadministrative radiation dose to patients, the primary source of failures seems to stem overwhelmingly, from the actions of people and only secondarily from machine mode failures. In essence, certain medical misadministrations are dominated by human events not machine failures. Radiological medical devices such as the Leksell Gamma Knife are very simple in design, have few moving parts, and are relatively free from the risks of wear when compared with a nuclear power plant. Since there are major technical differences between a gamma knife and a nuclear power plant, one must select a particular risk assessment method which is sensitive to these system differences and tailored to the unique medical aspects of the phenomena under study. These differences also generate major shifts in the philosophy and assumptions which drive the risk assessment (Machine-centered vs Person-centered) method. We were prompted by these basic differences to develop a person-centered approach to risk assessment which would reflect these basic philosophical and technological differences, have the necessary resolution in its metrics, and be highly reliable (repeatable). The risk approach chosen by the Livermore investigative team has been called the ''Relative Risk Profile Method'' and has been described in detail by Banks and Paramore, (1983)

  2. Overall strategy for risk evaluation and priority setting of risk regulations

    International Nuclear Information System (INIS)

    Hokstad, Per; Steiro, Trygve

    2006-01-01

    This paper presents the framework of an approach to support planning and priority setting for risk control. Such an approach could assist government/regulatory authorities in their allocation of resources among different sectors. The term risk will here be used in a very wide sense, and it will include, but not restrict to, the traditional HES (Health, Environment and Safety) concept. An overall classification of risk ('loss categories'), to be used across sectors and directorates is suggested. The risk evaluation includes a number of factors not accounted for in a standard risk assessment, but should be taken into account when authorities set priorities regarding risk control. Sociological, psychological and ethical perspectives are included, and the need for a discourse during the decision process is pinpointed. The paper also discusses the potential inclusion of cost benefit analyses in such an approach. The indicated approach is denoted Risk Across Sectors (RAS), and suggestions regarding the process to implement it are given. Such an implementation process will by itself increase the knowledge and competence of the involved parties

  3. Summary of EPA's risk assessment results from the analysis of alternative methods of low-level waste disposal

    International Nuclear Information System (INIS)

    Bandrowski, M.S.; Hung, C.Y.; Meyer, G.L.; Rogers, V.C.

    1987-01-01

    Evaluation of the potential health risk and individual exposure from a broad number of disposal alternatives is an important part of EPA's program to develop generally applicable environmental standards for the land disposal of low-level radioactive wastes (LLW). The Agency has completed an analysis of the potential population health risks and maximum individual exposures from ten disposal methods under three different hydrogeological and climatic settings. This paper briefly describes the general input and analysis procedures used in the risk assessment for LLW disposal and presents their preliminary results. Some important lessons learned from simulating LLW disposal under a large variety of methods and conditions are identified

  4. RFID Privacy Risk Evaluation Based on Synthetic Method of Extended Attack Tree and Information Feature Entropy

    OpenAIRE

    Li, Peng; Xu, Chao; Chen, Long; Wang, Ruchuan

    2015-01-01

    Evaluation of security risks in radio frequency identification (RFID) systems is a challenging problem in Internet of Things (IoT). This paper proposes an extended attack tree (EAT) model to identify RFID system’s flaws and vulnerabilities. A corresponding formal description of the model is described which adds a probability SAND node together with the probability attribute of the node attack. In addition, we model the process of an RFID data privacy attack based on EAT, taking a sensitive in...

  5. Evaluation of thermal risk assessment

    International Nuclear Information System (INIS)

    Loos, J.J.; Perry, E.S.

    1993-01-01

    Risk assessment was done in 1983 to estimate the ecological hazard of increasing the generating load and thermal output of an electric generating station. Subsequently, long-term monitoring in the vicinity of the station allowed verification of the predictions made in the risk assessment. This presentation will review the efficacy of early risk assessment methods in producing useful predictions from a resource management point of view. In 1984, the Chalk Point Generating facility of the Potomac Electric Power Company increased it's median generating load by 100%. Prior to this operational change, the Academy of Natural Sciences of Philadelphia synthesized site specific data, model predictions, and results from literature to assess the risk of additional waste heat to the Patuxent River subestuary of Chesapeake Bay. Risk was expressed as the number of days per year that various species of fish and the blue crab would be expected to avoid the discharge vicinity. Accuracy of these predictions is assessed by comparing observed fish and crab distributions and their observed frequencies of avoidance to those predicted. It is concluded that the predictions of this early risk assessment were sufficiently accurate to produce a reliable resource management decision

  6. Previsional evaluation of risks associated with ground transportation of uranium hexafluoride

    International Nuclear Information System (INIS)

    Pages, P.; Tomachevsky, E.

    1987-11-01

    This communication is a concrete example of application of the evaluation method for risks associated with road transportation of uranium hexafluoride by 48Y shipping container. The statistical bases for UF6 transportation are given by analysis of the list of accidents for dangerous road transportation. This study examines all parameters (cost-safety-meteorology-radiation doses) to take in account in the safety analysis of the UF6 transportation between Pierrelatte and Le Havre [fr

  7. A classification scheme for risk assessment methods.

    Energy Technology Data Exchange (ETDEWEB)

    Stamp, Jason Edwin; Campbell, Philip LaRoche

    2004-08-01

    This report presents a classification scheme for risk assessment methods. This scheme, like all classification schemes, provides meaning by imposing a structure that identifies relationships. Our scheme is based on two orthogonal aspects--level of detail, and approach. The resulting structure is shown in Table 1 and is explained in the body of the report. Each cell in the Table represent a different arrangement of strengths and weaknesses. Those arrangements shift gradually as one moves through the table, each cell optimal for a particular situation. The intention of this report is to enable informed use of the methods so that a method chosen is optimal for a situation given. This report imposes structure on the set of risk assessment methods in order to reveal their relationships and thus optimize their usage.We present a two-dimensional structure in the form of a matrix, using three abstraction levels for the rows and three approaches for the columns. For each of the nine cells in the matrix we identify the method type by name and example. The matrix helps the user understand: (1) what to expect from a given method, (2) how it relates to other methods, and (3) how best to use it. Each cell in the matrix represent a different arrangement of strengths and weaknesses. Those arrangements shift gradually as one moves through the table, each cell optimal for a particular situation. The intention of this report is to enable informed use of the methods so that a method chosen is optimal for a situation given. The matrix, with type names in the cells, is introduced in Table 2 on page 13 below. Unless otherwise stated we use the word 'method' in this report to refer to a 'risk assessment method', though often times we use the full phrase. The use of the terms 'risk assessment' and 'risk management' are close enough that we do not attempt to distinguish them in this report. The remainder of this report is organized as follows. In

  8. Pragmatism, Evidence, and Mixed Methods Evaluation

    Science.gov (United States)

    Hall, Jori N.

    2013-01-01

    Mixed methods evaluation has a long-standing history of enhancing the credibility of evaluation findings. However, using mixed methods in a utilitarian way implicitly emphasizes convenience over engaging with its philosophical underpinnings (Denscombe, 2008). Because of this, some mixed methods evaluators and social science researchers have been…

  9. New method for assessing risks of email

    Science.gov (United States)

    Raja, Seyyed H.; Afrooz, Farzad

    2013-03-01

    E-mail technology, has become one of the requirements of human lives for correspondence between individuals. Given this, the important point is that the messages, server and client of e-mail and correspondences that exchanged between different people have acceptable security, to make people sure to use of this technology. In the information age, many of financial and non financial transactions are done electronically, data exchange takes place via the internet and theft and manipulation of data can make exorbitant cost in terms of integrity, financial, political, economic and culture. E-mail correspondence in there is same and it is very important. With review took place, a method that will focus on email system for risks assessment is not provided. We are examining ways of assessing for other systems and their strengths and weaknesses, then we use Mr Convery method for assessing email risks which it is for assessing network risks. At the end of paper we have offered special table for email risk assessment.

  10. Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities

    International Nuclear Information System (INIS)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-09-01

    This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km 2 (570-mi 2 ) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation

  11. Risk assessment of power systems models, methods, and applications

    CERN Document Server

    Li, Wenyuan

    2014-01-01

    Risk Assessment of Power Systems addresses the regulations and functions of risk assessment with regard to its relevance in system planning, maintenance, and asset management. Brimming with practical examples, this edition introduces the latest risk information on renewable resources, the smart grid, voltage stability assessment, and fuzzy risk evaluation. It is a comprehensive reference of a highly pertinent topic for engineers, managers, and upper-level students who seek examples of risk theory applications in the workplace.

  12. Analysis of risk assessment methods for goods trucking

    Directory of Open Access Journals (Sweden)

    Yunyazova A.O.

    2018-04-01

    Full Text Available the article considers models of risk assessment that can be applied to cargo transportation, for forecasting possible damage in the form of financial and material costs in order to reduce the percentage of probability of their occurrence. The analysis of risk by the method «Criterion. Event. Rule" is represented. This method is based on the collection of information by various methods, assigning an assessment to the identified risks, ranking and formulating a report on the analysis. It can be carried out as a fully manual mechanical method of information collecting and performing calculations or can be brought to an automated level from data collection to the delivery of finished results (but in this case some nuances that could significantly influence the outcome of the analysis can be ignored. The expert method is of particular importance, since it relies directly on human experience. In this case, a special role is played by the human factor. The collection of information and the assigned assessments to risk groups depend on the extent to which experts agree on this issue. The smaller the fluctuations in the values ​​of the estimates of the experts, the more accurate and optimal the results will be.

  13. [Guidance of FDA risk evaluation and mitigation strategy and enlightenment to drug risk management of post-marketing Chinese medicine].

    Science.gov (United States)

    Li, Yuanyuan; Xie, Yanming

    2011-10-01

    The FDA risk evaluation and mitigation strategy (REMS) aims to drugs or biological products known or potential serious risk management. Analysis with the example of the content of the Onsolis REMS named FOCOS. Our country can be reference for the analysis of relevant experience and establish a scientific evaluation mechanism, strengthen the drug risk consciousness, promote the rational drug use, organic combined with the before-marketing and post-marketing evaluation of traditional Chinese medicine, and promote the evaluation of risk management of the drug development and improvement.

  14. [Using sequential indicator simulation method to define risk areas of soil heavy metals in farmland.

    Science.gov (United States)

    Yang, Hao; Song, Ying Qiang; Hu, Yue Ming; Chen, Fei Xiang; Zhang, Rui

    2018-05-01

    The heavy metals in soil have serious impacts on safety, ecological environment and human health due to their toxicity and accumulation. It is necessary to efficiently identify the risk area of heavy metals in farmland soil, which is of important significance for environment protection, pollution warning and farmland risk control. We collected 204 samples and analyzed the contents of seven kinds of heavy metals (Cu, Zn, Pb, Cd, Cr, As, Hg) in Zengcheng District of Guangzhou, China. In order to overcame the problems of the data, including the limitation of abnormal values and skewness distribution and the smooth effect with the traditional kriging methods, we used sequential indicator simulation method (SISIM) to define the spatial distribution of heavy metals, and combined Hakanson index method to identify potential ecological risk area of heavy metals in farmland. The results showed that: (1) Based on the similar accuracy of spatial prediction of soil heavy metals, the SISIM had a better expression of detail rebuild than ordinary kriging in small scale area. Compared to indicator kriging, the SISIM had less error rate (4.9%-17.1%) in uncertainty evaluation of heavy-metal risk identification. The SISIM had less smooth effect and was more applicable to simulate the spatial uncertainty assessment of soil heavy metals and risk identification. (2) There was no pollution in Zengcheng's farmland. Moderate potential ecological risk was found in the southern part of study area due to enterprise production, human activities, and river sediments. This study combined the sequential indicator simulation with Hakanson risk index method, and effectively overcame the outlier information loss and smooth effect of traditional kriging method. It provided a new way to identify the soil heavy metal risk area of farmland in uneven sampling.

  15. The Risk Evaluation of Agricultural High-tech Investment Project%农业高新技术投资项目风险评价

    Institute of Scientific and Technical Information of China (English)

    陆迁; 苗姗姗

    2005-01-01

    The agricultural high-tech investment project (AHIP) is characterized by technology-intensive, high risk and great profit. This article analyzes essential factors of the risks of the agricultural high-tech investment projects and the traditional risk evaluation method of agricultural projects. We think that the applications of the sensitivity analysis and probability are defective. Therefore, this article introduces a structural model to evaluate the risks of the agricultural high-tech investment projects and the system of the concrete evaluation indexes.

  16. Evaluation of a constipation risk assessment scale.

    Science.gov (United States)

    Zernike, W; Henderson, A

    1999-06-01

    This project was undertaken in order to evaluate the utility of a constipation risk assessment scale and the accompanying bowel management protocol. The risk assessment scale was primarily introduced to teach and guide staff in managing constipation when caring for patients. The intention of the project was to reduce the incidence of constipation in patients during their admission to hospital.

  17. A workshop on developing risk assessment methods for medical use of radioactive material. Volume 1: Summary

    Energy Technology Data Exchange (ETDEWEB)

    Tortorelli, J.P. [ed.] [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

    1995-08-01

    A workshop was held at the Idaho National Engineering Laboratory, August 16--18, 1994 on the topic of risk assessment on medical devices that use radioactive isotopes. Its purpose was to review past efforts to develop a risk assessment methodology to evaluate these devices, and to develop a program plan and a scoping document for future methodology development. This report contains a summary of that workshop. Participants included experts in the fields of radiation oncology, medical physics, risk assessment, human-error analysis, and human factors. Staff from the US Nuclear Regulatory Commission (NRC) associated with the regulation of medical uses of radioactive materials and with research into risk-assessment methods participated in the workshop. The workshop participants concurred in NRC`s intended use of risk assessment as an important technology in the development of regulations for the medical use of radioactive material and encouraged the NRC to proceed rapidly with a pilot study. Specific recommendations are included in the executive summary and the body of this report. An appendix contains the 8 papers presented at the conference: NRC proposed policy statement on the use of probabilistic risk assessment methods in nuclear regulatory activities; NRC proposed agency-wide implementation plan for probabilistic risk assessment; Risk evaluation of high dose rate remote afterloading brachytherapy at a large research/teaching institution; The pros and cons of using human reliability analysis techniques to analyze misadministration events; Review of medical misadministration event summaries and comparison of human error modeling; Preliminary examples of the development of error influences and effects diagrams to analyze medical misadministration events; Brachytherapy risk assessment program plan; and Principles of brachytherapy quality assurance.

  18. A workshop on developing risk assessment methods for medical use of radioactive material. Volume 1: Summary

    International Nuclear Information System (INIS)

    Tortorelli, J.P.

    1995-08-01

    A workshop was held at the Idaho National Engineering Laboratory, August 16--18, 1994 on the topic of risk assessment on medical devices that use radioactive isotopes. Its purpose was to review past efforts to develop a risk assessment methodology to evaluate these devices, and to develop a program plan and a scoping document for future methodology development. This report contains a summary of that workshop. Participants included experts in the fields of radiation oncology, medical physics, risk assessment, human-error analysis, and human factors. Staff from the US Nuclear Regulatory Commission (NRC) associated with the regulation of medical uses of radioactive materials and with research into risk-assessment methods participated in the workshop. The workshop participants concurred in NRC's intended use of risk assessment as an important technology in the development of regulations for the medical use of radioactive material and encouraged the NRC to proceed rapidly with a pilot study. Specific recommendations are included in the executive summary and the body of this report. An appendix contains the 8 papers presented at the conference: NRC proposed policy statement on the use of probabilistic risk assessment methods in nuclear regulatory activities; NRC proposed agency-wide implementation plan for probabilistic risk assessment; Risk evaluation of high dose rate remote afterloading brachytherapy at a large research/teaching institution; The pros and cons of using human reliability analysis techniques to analyze misadministration events; Review of medical misadministration event summaries and comparison of human error modeling; Preliminary examples of the development of error influences and effects diagrams to analyze medical misadministration events; Brachytherapy risk assessment program plan; and Principles of brachytherapy quality assurance

  19. Evaluation of test intervals strategies with a risk monitor

    International Nuclear Information System (INIS)

    Soerman, J.

    2005-01-01

    The Swedish nuclear power utility Oskarshamn Power Group (OKG), is investigating how the use of a risk monitor can facilitate and improve risk-informed decision-making at their nuclear power plants. The intent is to evaluate if risk-informed decision-making can be accepted. A pilot project was initiated and carried out in 2004. The project included investigating if a risk monitor can be used for optimising test intervals for diesel- and gas turbine generators with regard to risk level. The Oskarhamn 2 (O2), PSA Level 1 model was converted into a risk monitor using RiskSpectrum RiskWatcher (RSRW) software. The converted PSA model included the complete PSA model for the power operation mode. RSRW then performs a complete requantification for every analysis. Time dependent reliability data are taken into account, i.e. a shorter test interval will increases the components availability (possibility to e.g. start on demand). The converted O2 model was then used to investigate whether it would be possible to balance longer test intervals for diesel generators, gas turbine generators and high pressure injection system with shorter test intervals for the low pressure injection system, while maintaining a low risk level at the plant. The results show that a new mixture of test intervals can be implemented with only marginally changes in the risk calculated with the risk monitor model. The results indicate that the total number of test activities for the systems included in the pilot study could be reduced by 20% with a maintained level of risk. A risk monitor taking into account the impact from test intervals in availability calculations for components is well suited for evaluation of test interval strategies. It also enables the analyst to evaluate the risk level over a period of time including the impact the actual status of the plant may have on the risk level. (author)

  20. Evaluation of risk factors for vancomycin-induced nephrotoxicity.

    Science.gov (United States)

    Park, So Jin; Lim, Na Ri; Park, Hyo Jung; Yang, Jae Wook; Kim, Min-Ji; Kim, Kyunga; In, Yong Won; Lee, Young Mee

    2018-05-09

    Background Vancomycin is a glycopeptide antibiotic of choice for the treatment of serious infections caused by multi-resistant Gram-positive bacteria. However, vancomycin-associated nephrotoxicity (VAN) often limits its use. Previous data suggested a few risk factors of VAN, including higher mean vancomycin trough level, higher daily doses, old age, long duration of vancomycin therapy, and concomitant nephrotoxins. Objective To evaluate the incidence and risk factors of VAN and determine whether higher vancomycin trough concentrations were associated with a greater risk for VAN. Settings A retrospective, observational, single-center study at the 1960-bed university-affiliated tertiary care hospital (Samsung Medical Center), Seoul, Korea. Method A retrospective analysis of adult patients who received vancomycin parenterally in a tertiary care medical center from March 1, 2013 to June 30, 2013 was performed. We excluded patients with a baseline serum creatinine level > 2 mg/dL and those who had a history of end-stage renal disease and dialysis at baseline. The clinical characteristics were compared between patients with nephrotoxicity and those without nephrotoxicity to identify the risk factors associated with VAN. Main outcome measure Incidence of VAN and VAN-associated risk factors were analyzed. Results Of the 315 vancomycin-treated patients, nephrotoxicity occurred in 15.2% of the patients. In multivariate analysis, higher vancomycin trough concentrations of > 20 mg∕L (OR 9.57, 95% CI 2.49-36.83, p < 0.01) and intensive care unit (ICU) residence (OR 2.86, 95% CI 1.41-5.82, p < 0.01) were independently associated with VAN. Conclusion Our findings suggest that higher vancomycin trough levels and ICU residence might be associated with a greater risk for VAN. More careful monitoring of vancomycin serum trough levels and patient status might facilitate the timely prevention of VAN.

  1. Alternative Testing Methods for Predicting Health Risk from Environmental Exposures

    Directory of Open Access Journals (Sweden)

    Annamaria Colacci

    2014-08-01

    Full Text Available Alternative methods to animal testing are considered as promising tools to support the prediction of toxicological risks from environmental exposure. Among the alternative testing methods, the cell transformation assay (CTA appears to be one of the most appropriate approaches to predict the carcinogenic properties of single chemicals, complex mixtures and environmental pollutants. The BALB/c 3T3 CTA shows a good degree of concordance with the in vivo rodent carcinogenesis tests. Whole-genome transcriptomic profiling is performed to identify genes that are transcriptionally regulated by different kinds of exposures. Its use in cell models representative of target organs may help in understanding the mode of action and predicting the risk for human health. Aiming at associating the environmental exposure to health-adverse outcomes, we used an integrated approach including the 3T3 CTA and transcriptomics on target cells, in order to evaluate the effects of airborne particulate matter (PM on toxicological complex endpoints. Organic extracts obtained from PM2.5 and PM1 samples were evaluated in the 3T3 CTA in order to identify effects possibly associated with different aerodynamic diameters or airborne chemical components. The effects of the PM2.5 extracts on human health were assessed by using whole-genome 44 K oligo-microarray slides. Statistical analysis by GeneSpring GX identified genes whose expression was modulated in response to the cell treatment. Then, modulated genes were associated with pathways, biological processes and diseases through an extensive biological analysis. Data derived from in vitro methods and omics techniques could be valuable for monitoring the exposure to toxicants, understanding the modes of action via exposure-associated gene expression patterns and to highlight the role of genes in key events related to adversity.

  2. Risk-averse formulations and methods for a virtual power plant

    KAUST Repository

    Lima, Ricardo M.; Conejo, Antonio J.; Langodan, Sabique; Hoteit, Ibrahim; Knio, Omar M.

    2017-01-01

    In this paper we address the optimal operation of a virtual power plant using stochastic programming. We consider one risk-neutral and two risk-averse formulations that rely on the conditional value at risk. To handle large-scale problems, we implement two decomposition methods with variants using single- and multiple-cuts. We propose the utilization of wind ensembles obtained from the European Centre for Medium Range Weather Forecasts (ECMWF) to quantify the uncertainty of the wind forecast. We present detailed results relative to the computational performance of the risk-averse formulations, the decomposition methods, and risk management and sensitivities analysis as a function of the number of scenarios and risk parameters. The implementation of the two decomposition methods relies on the parallel solution of subproblems, which turns out to be paramount for computational efficiency. The results show that one of the two decomposition methods is the most efficient.

  3. Risk-averse formulations and methods for a virtual power plant

    KAUST Repository

    Lima, Ricardo M.

    2017-12-15

    In this paper we address the optimal operation of a virtual power plant using stochastic programming. We consider one risk-neutral and two risk-averse formulations that rely on the conditional value at risk. To handle large-scale problems, we implement two decomposition methods with variants using single- and multiple-cuts. We propose the utilization of wind ensembles obtained from the European Centre for Medium Range Weather Forecasts (ECMWF) to quantify the uncertainty of the wind forecast. We present detailed results relative to the computational performance of the risk-averse formulations, the decomposition methods, and risk management and sensitivities analysis as a function of the number of scenarios and risk parameters. The implementation of the two decomposition methods relies on the parallel solution of subproblems, which turns out to be paramount for computational efficiency. The results show that one of the two decomposition methods is the most efficient.

  4. Evaluation of AECB-1119, risk of energy production

    International Nuclear Information System (INIS)

    1978-01-01

    The Inhaber report, 'Risk of Energy Production', is evaluated based on how the conclusions of the report match its objectives, the methodology used to reach the report's conclusions, and the presentation of the report. The authors recommend that a second volume containing the pertinent data used in the report should be published; and that total risks should be calculated ignoring material acquisition, construction and transportation risks, using the actual energy output of the various systems without imposing a backup energy supply, and comparing systems in such a way that death, injury and disease risks may be considered separately. They propose that the Atomic Energy Control Board should show how the report results relate to nuclear safety, and that the AECB should clarify the criteria for evaluating the small probability of a catastrophic nuclear accident. The response of the author of AECB--1119 is given in a separate section

  5. 7 CFR 319.59-3 - Articles prohibited importation pending risk evaluation.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Articles prohibited importation pending risk... Diseases § 319.59-3 Articles prohibited importation pending risk evaluation. The articles listed in...(b), pending the completion of an evaluation by APHIS of the potential pest risks associated with the...

  6. A Conceptual Framework for the Evaluation of Emergency Risk Communications.

    Science.gov (United States)

    Savoia, Elena; Lin, Leesa; Gamhewage, Gaya M

    2017-09-01

    To articulate a conceptual framework in support of evaluation activities in emergency risk communications (ERC). The framework proposed is based on a systematic review of the scientific literature (2001-2016) combined with data derived from a series of semistructured interviews with experts and practitioners in ERC, and it is designed to support local, national, and international public health organizations in implementing evaluation studies in ERC. We identified a list of ERC outcomes from the full-text review of 152 articles and categorized these into 3 groups, depending upon the level at which the outcome was measured: (1) information environment, (2) population, and (3) public health system. We analyzed interviewees' data from 18 interviews to identify practices and processes related to the effectiveness of ERC and included these as key structural components and processes in the developed evaluation framework. Researchers and public health practitioners interested in the evaluation of ERC can use the conceptual framework described in this article to guide the development of evaluation studies and methods for assessing communication outcomes related to public health emergencies.

  7. Use of Monte Carlo modeling approach for evaluating risk and environmental compliance

    International Nuclear Information System (INIS)

    Higley, K.A.; Strenge, D.L.

    1988-09-01

    Evaluating compliance with environmental regulations, specifically those regulations that pertain to human exposure, can be a difficult task. Historically, maximum individual or worst-case exposures have been calculated as a basis for evaluating risk or compliance with such regulations. However, these calculations may significantly overestimate exposure and may not provide a clear understanding of the uncertainty in the analysis. The use of Monte Carlo modeling techniques can provide a better understanding of the potential range of exposures and the likelihood of high (worst-case) exposures. This paper compares the results of standard exposure estimation techniques with the Monte Carlo modeling approach. The authors discuss the potential application of this approach for demonstrating regulatory compliance, along with the strengths and weaknesses of the approach. Suggestions on implementing this method as a routine tool in exposure and risk analyses are also presented. 16 refs., 5 tabs

  8. Risk assessment and remedial policy evaluation using predictive modeling

    International Nuclear Information System (INIS)

    Linkov, L.; Schell, W.R.

    1996-01-01

    As a result of nuclear industry operation and accidents, large areas of natural ecosystems have been contaminated by radionuclides and toxic metals. Extensive societal pressure has been exerted to decrease the radiation dose to the population and to the environment. Thus, in making abatement and remediation policy decisions, not only economic costs but also human and environmental risk assessments are desired. This paper introduces a general framework for risk assessment and remedial policy evaluation using predictive modeling. Ecological risk assessment requires evaluation of the radionuclide distribution in ecosystems. The FORESTPATH model is used for predicting the radionuclide fate in forest compartments after deposition as well as for evaluating the efficiency of remedial policies. Time of intervention and radionuclide deposition profile was predicted as being crucial for the remediation efficiency. Risk assessment conducted for a critical group of forest users in Belarus shows that consumption of forest products (berries and mushrooms) leads to about 0.004% risk of a fatal cancer annually. Cost-benefit analysis for forest cleanup suggests that complete removal of organic layer is too expensive for application in Belarus and a better methodology is required. In conclusion, FORESTPATH modeling framework could have wide applications in environmental remediation of radionuclides and toxic metals as well as in dose reconstruction and, risk-assessment

  9. Knowledge-Based Energy Damage Model for Evaluating Industrialised Building Systems (IBS Occupational Health and Safety (OHS Risk

    Directory of Open Access Journals (Sweden)

    Abas Nor Haslinda

    2016-01-01

    Full Text Available Malaysia’s construction industry has been long considered hazardous, owing to its poor health and safety record. It is proposed that one of the ways to improve safety and health in the construction industry is through the implementation of ‘off-site’ systems, commonly termed ‘industrialised building systems (IBS’ in Malaysia. This is deemed safer based on the risk concept of reduced exposure, brought about by the reduction in onsite workers; however, no method yet exists for determining the relative safety of various construction methods, including IBS. This study presents a comparative evaluation of the occupational health and safety (OHS risk presented by different construction approaches, namely IBS and traditional methods. The evaluation involved developing a model based on the concept of ‘argumentation theory’, which helps construction designers integrate the management of OHS risk into the design process. In addition, an ‘energy damage model’ was used as an underpinning framework. Development of the model was achieved through three phases, namely Phase I – knowledge acquisitaion, Phase II – argument trees mapping, and Phase III – validation of the model. The research revealed that different approaches/methods of construction projects carried a different level of energy damage, depending on how the activities were carried out. A study of the way in which the risks change from one construction process to another shows that there is a difference in the profile of OHS risk between IBS construction and traditional methods.Therefore, whether the option is an IBS or traditional approach, the fundamental idea of the model is to motivate construction designers or decision-makers to address safety in the design process and encourage them to examine carefully the probable OHS risk variables surrounding an action, thus preventing accidents in construction.

  10. A neural network model for credit risk evaluation.

    Science.gov (United States)

    Khashman, Adnan

    2009-08-01

    Credit scoring is one of the key analytical techniques in credit risk evaluation which has been an active research area in financial risk management. This paper presents a credit risk evaluation system that uses a neural network model based on the back propagation learning algorithm. We train and implement the neural network to decide whether to approve or reject a credit application, using seven learning schemes and real world credit applications from the Australian credit approval datasets. A comparison of the system performance under the different learning schemes is provided, furthermore, we compare the performance of two neural networks; with one and two hidden layers following the ideal learning scheme. Experimental results suggest that neural networks can be effectively used in automatic processing of credit applications.

  11. Evaluation of sustainable supply chain risk management using an integrated fuzzy TOPSIS- CRITIC approach

    DEFF Research Database (Denmark)

    Rostamzadeh, Reza; Ghorabaee, Mehdi Keshavarz; Govindan, Kannan

    2018-01-01

    Supply chain risk management research has mainly mistreated the important of sustainability issues. Moreover, there is little knowledge about sustainable management of risk and supply chain and the way they impose losses for firms. Risk management's duty in the supply chain is to identify, analyze......, and provide solutions for accountability, control and monitor the risks in the economic and production cycle. This study aims to develop a framework for the sustainable supply chain risk management (SSCRM) evaluation. To this end, an integrated fuzzy multi-criteria decision-making (MCDM) approach is proposed...... based on the technique in order of preference by similarity to ideal solution (TOPSIS) and criteria importance through inter-criteria correlation (CRITIC) methods. The literature was reviewed and the potential criteria were identified. Through an expert panel the criteria were filtered. Seven main...

  12. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  13. A comparison of two prospective risk analysis methods: Traditional FMEA and a modified healthcare FMEA.

    Science.gov (United States)

    Rah, Jeong-Eun; Manger, Ryan P; Yock, Adam D; Kim, Gwe-Ya

    2016-12-01

    To examine the abilities of a traditional failure mode and effects analysis (FMEA) and modified healthcare FMEA (m-HFMEA) scoring methods by comparing the degree of congruence in identifying high risk failures. The authors applied two prospective methods of the quality management to surface image guided, linac-based radiosurgery (SIG-RS). For the traditional FMEA, decisions on how to improve an operation were based on the risk priority number (RPN). The RPN is a product of three indices: occurrence, severity, and detectability. The m-HFMEA approach utilized two indices, severity and frequency. A risk inventory matrix was divided into four categories: very low, low, high, and very high. For high risk events, an additional evaluation was performed. Based upon the criticality of the process, it was decided if additional safety measures were needed and what they comprise. The two methods were independently compared to determine if the results and rated risks matched. The authors' results showed an agreement of 85% between FMEA and m-HFMEA approaches for top 20 risks of SIG-RS-specific failure modes. The main differences between the two approaches were the distribution of the values and the observation that failure modes (52, 54, 154) with high m-HFMEA scores do not necessarily have high FMEA-RPN scores. In the m-HFMEA analysis, when the risk score is determined, the basis of the established HFMEA Decision Tree™ or the failure mode should be more thoroughly investigated. m-HFMEA is inductive because it requires the identification of the consequences from causes, and semi-quantitative since it allows the prioritization of high risks and mitigation measures. It is therefore a useful tool for the prospective risk analysis method to radiotherapy.

  14. Method for Assessing the Integrated Risk of Soil Pollution in Industrial and Mining Gathering Areas

    Science.gov (United States)

    Guan, Yang; Shao, Chaofeng; Gu, Qingbao; Ju, Meiting; Zhang, Qian

    2015-01-01

    Industrial and mining activities are recognized as major sources of soil pollution. This study proposes an index system for evaluating the inherent risk level of polluting factories and introduces an integrated risk assessment method based on human health risk. As a case study, the health risk, polluting factories and integrated risks were analyzed in a typical industrial and mining gathering area in China, namely, Binhai New Area. The spatial distribution of the risk level was determined using a Geographic Information System. The results confirmed the following: (1) Human health risk in the study area is moderate to extreme, with heavy metals posing the greatest threat; (2) Polluting factories pose a moderate to extreme inherent risk in the study area. Such factories are concentrated in industrial and urban areas, but are irregularly distributed and also occupy agricultural land, showing a lack of proper planning and management; (3) The integrated risks of soil are moderate to high in the study area. PMID:26580644

  15. Method for Assessing the Integrated Risk of Soil Pollution in Industrial and Mining Gathering Areas.

    Science.gov (United States)

    Guan, Yang; Shao, Chaofeng; Gu, Qingbao; Ju, Meiting; Zhang, Qian

    2015-11-13

    Industrial and mining activities are recognized as major sources of soil pollution. This study proposes an index system for evaluating the inherent risk level of polluting factories and introduces an integrated risk assessment method based on human health risk. As a case study, the health risk, polluting factories and integrated risks were analyzed in a typical industrial and mining gathering area in China, namely, Binhai New Area. The spatial distribution of the risk level was determined using a Geographic Information System. The results confirmed the following: (1) Human health risk in the study area is moderate to extreme, with heavy metals posing the greatest threat; (2) Polluting factories pose a moderate to extreme inherent risk in the study area. Such factories are concentrated in industrial and urban areas, but are irregularly distributed and also occupy agricultural land, showing a lack of proper planning and management; (3) The integrated risks of soil are moderate to high in the study area.

  16. Synthesis of Enterprise and Value-Based Methods for Multiattribute Risk Analysis

    International Nuclear Information System (INIS)

    Kenley, C. Robert; Collins, John W.; Beck, John M.; Heydt, Harold J.; Garcia, Chad B.

    2001-01-01

    This paper describes a method for performing multiattribute decision analysis to prioritize ap-proaches to handling risks during the development and operation of complex socio-technical systems. The method combines risk categorization based on enterprise views, risk prioritization of the categories based on the Analytic Hierarchy Process (AHP), and more standard probability-consequence ratings schemes. We also apply value-based testing me-thods used in software development to prioritize risk-handling approaches. We describe a tool that synthesizes the methods and performs a multiattribute analysis of the technical and pro-grammatic risks on the Next Generation Nuclear Plant (NGNP) enterprise.

  17. Dipyridamole-thallium scanning in patients undergoing vascular surgery. Optimizing preoperative evaluation of cardiac risk

    International Nuclear Information System (INIS)

    Eagle, K.A.; Singer, D.E.; Brewster, D.C.; Darling, R.C.; Mulley, A.G.; Boucher, C.A.

    1987-01-01

    Dipyridamole-thallium imaging has been suggested as a method of preoperatively assessing cardiac risk in patients undergoing major surgery. To define more clearly its proper role in preoperative assessment, we prospectively evaluated 111 patients undergoing vascular surgery. In the first set of 61 patients, our data confirmed the value of preoperative dipyridamole-thallium scanning in identifying the patients who suffered postoperative ischemic events. Events occurred in eight of 18 patients with reversible defects on preoperative imaging, compared with no events in 43 patients with no thallium redistribution (confidence interval for the risk difference: 0.624, 0.256). The results also suggested that clinical factors might allow identification of a low-risk subset of patients. To test the hypothesis that patients with no evidence of congestive heart failure, angina, prior myocardial infarction, or diabetes do not require further preoperative testing, we evaluated an additional 50 patients having vascular procedures. None of the 23 without the clinical markers had untoward outcomes, while ten of 27 patients with one or more of these clinical markers suffered postoperative ischemic events (confidence interval for the risk difference: 0.592, 0.148). In the clinical high-risk subset, further risk stratification is achieved with dipyridamole-thallium scanning

  18. Societal risk approach to safeguards design and evaluation

    International Nuclear Information System (INIS)

    Murphey, W.M.; Sherr, T.S.; Bennett, C.A.

    1975-01-01

    A comprehensive rationale for safeguards design and evaluation, and a framework for continuing systematic assessment of the system's effectiveness and efficient allocation of available safeguards resources for balanced protection, were developed. The societal risk approach employed considers the likelihood of successful destructive acts involving nuclear materials or facilities and the magnitude of the effects on society. The safeguards problem is described in terms of events affecting societal risk and adversary actions. Structure of the safeguards system and the evaluation of its adequacy are discussed. Adversary characteristics are also discussed

  19. Risk Assessment for Water Supply Systems in Iran During Crises Using the RAMCAP Method

    Directory of Open Access Journals (Sweden)

    Jalal Nakhaei

    2017-09-01

    Full Text Available Heavy damages might be inflicted upon national infrastructure due to a variety of disasters caused by natural events or human activities. One example of such vital infrastructure at risk is the water supply system. At the time of crises, the water supply system is expected to continue supplying water to citizens, or the crisis will be augmented. This warrants the potential threats and their effects on the system to be identified and evaluated in an attempt to determine the vulnerable systems and sites toward proper solutions. In this study, the assets and the associated threats of the water supply are identified followed by a vulnerability analysis. The RAMCAP method is then employed to determine values for the risks associated with each of the assets including dams, water storage systems, pumping stations, treatment plants, water wells, and building units. Methods are proposed to reduce these risks before a crisis occurs. In addition, basic threats due to air-missile and Cyber attacks are also considered.

  20. Empirical evaluation methods in computer vision

    CERN Document Server

    Christensen, Henrik I

    2002-01-01

    This book provides comprehensive coverage of methods for the empirical evaluation of computer vision techniques. The practical use of computer vision requires empirical evaluation to ensure that the overall system has a guaranteed performance. The book contains articles that cover the design of experiments for evaluation, range image segmentation, the evaluation of face recognition and diffusion methods, image matching using correlation methods, and the performance of medical image processing algorithms. Sample Chapter(s). Foreword (228 KB). Chapter 1: Introduction (505 KB). Contents: Automate

  1. Evaluation of risk factors for thrombophilia in patients with cerebral venous thrombosis

    OpenAIRE

    Osman Yokuş; Özlem Şahin Balçık; Murat Albayrak; Funda Ceran; Simten Dağdaş; Mesude Yılmaz; Gülsüm Özet

    2010-01-01

    Objective: The increased risk for thrombosis is known as hypercoagulability or thrombophilia. In our study, we aimed to determine the frequency of the identified defects for thrombophilia in patients with central venous thrombosis aged under 50 years and to compare results with the findings in the current literature. Materials and Methods: Forty-three patients (16-50 years old) were retrospectively evaluated. Thrombophilia investigation included determinations of protein C, protein S, antithr...

  2. Methods and Metrics for Evaluating Environmental Dredging ...

    Science.gov (United States)

    This report documents the objectives, approach, methodologies, results, and interpretation of a collaborative research study conducted by the National Risk Management Research Laboratory (NRMRL) and the National Exposure Research laboratory (NERL) of the U.S. Environmental Protection Agency’s (U.S. EPA’s) Office of Research and Development (ORD) and the U.S. EPA’s Great Lakes National Program Office (GLNPO). The objectives of the research study were to: 1) evaluate remedy effectiveness of environmental dredging as applied to contaminated sediments in the Ashtabula River in northeastern Ohio, and 2) monitor the recovery of the surrounding ecosystem. The project was carried out over 6 years from 2006 through 2011 and consisted of the development and evaluation of methods and approaches to assess river and ecosystem conditions prior to dredging (2006), during dredging (2006 and 2007), and following dredging, both short term (2008) and long term (2009-2011). This project report summarizes and interprets the results of this 6-year study to develop and assess methods for monitoring pollutant fate and transport and ecosystem recovery through the use of biological, chemical, and physical lines of evidence (LOEs) such as: 1) comprehensive sampling of and chemical analysis of contaminants in surface, suspended, and historic sediments; 2) extensive grab and multi-level real time water sampling and analysis of contaminants in the water column; 3) sampling, chemi

  3. Applicability of PRA methods and data to the financial risk assessment of nuclear power plants

    International Nuclear Information System (INIS)

    El-Sheik, K.A.

    1985-01-01

    Financial risk assessment, where the probability and severity of financial consequences are estimated, offers a logical framework for organizing and evaluating data pertinent to nuclear power plant accidents. Under the sponsorship of the Electric Power Research Institute, General Electric investigated the feasibility of financial risk assessment of nuclear power plants and of applying PRA methods and data in such an assessment. This paper summarizes the main findings of this investigation. Specifically, the paper discussed the following topics: definition of financial consequences and financial risk; overall approach for financial risk assessment and how it compares with the approach for PRA used in the Reactor Safety Study; and specific financial risk assessment procedures for defining initiating events, plant response sequences, institutional scenarios, and financial consequences and how they compare to analogous procedures for PRA

  4. The use of current risk analysis tools evaluated towards preventing external domino accidents

    NARCIS (Netherlands)

    Reniers, Genserik L L; Dullaert, W.; Ale, B. J.M.; Soudan, K.

    Risk analysis is an essential tool for company safety policy. Risk analysis consists of identifying and evaluating all possible risks. The efficiency of risk analysis tools depends on the rigueur of identifying and evaluating all possible risks. The diversity in risk analysis procedures is such that

  5. Supplier Risk Assessment Based on Best-Worst Method and K-Means Clustering: A Case Study

    Directory of Open Access Journals (Sweden)

    Merve Er Kara

    2018-04-01

    Full Text Available Supplier evaluation and selection is one of the most critical strategic decisions for developing a competitive and sustainable organization. Companies have to consider supplier related risks and threats in their purchasing decisions. In today’s competitive and risky business environment, it is very important to work with reliable suppliers. This study proposes a clustering based approach to group suppliers based on their risk profile. Suppliers of a company in the heavy-machinery sector are assessed based on 17 qualitative and quantitative risk types. The weights of the criteria are determined by using the Best-Worst method. Four factors are extracted by applying Factor Analysis to the supplier risk data. Then k-means clustering algorithm is applied to group core suppliers of the company based on the four risk factors. Three clusters are created with different risk exposure levels. The interpretation of the results provides insights for risk management actions and supplier development programs to mitigate supplier risk.

  6. Questionnaire-based risk assessment system

    International Nuclear Information System (INIS)

    Sakajo, Satoko; Ohi, Tadashi

    2004-01-01

    In order to reduce human errors efficiently, it is important to evaluate error-likely tasks and improve them. There are a lot of evaluation methods, for example, experimental evaluation methods, investigations by the expert of human factors, checking guidelines, estimating human error probabilities, and so on. There are roughly two problems in those methods. (1) Qualitative evaluation methods do not evaluate how likely human errors will occur and do not estimate how effective the countermeasure is in reducing human error. (2) Most of the quantitative evaluation methods and detailed analysis methods require expert's judgment. We developed a questionnaire-based risk assessment method and its system. In this paper, we introduce the concept of the method, realization, and applications to a maintenance procedure of a nuclear power plant and an elevator. The feature of the method is that it is so simple and the inexpert can easily evaluate the risk of human error. Furthermore, because it is provided as an application service provider system, a lot of evaluators can use it simultaneously through internet and it is easy to collect and sum up the responses. We confirmed that it is useful to evaluate the risk of human error, analyze the problem, and estimate the effectiveness of countermeasures in advance through the applications. (author)

  7. Prometheus unbound - challenges of risk evaluation, risk classification, and risk management

    Energy Technology Data Exchange (ETDEWEB)

    Klinke, A.; Renn, O.

    1999-11-01

    For dealing with risks in a rational fashion, it is necessary to characterize risks and use the parameters of characterization as tools for designing appropriate actions. This reports suggests a set of criteria that one can use in evaluating risks. These criteria include: - Damage potential, i.e. the amount of damage that the hazard can cause; - probability of occurrence, i.e. the likelihood that a specific damage will occur; - incertitude, i.e., the remaining uncertainties that are not covered by the assessment of probabilities (subdivided in statistical uncertainties, genuine uncertainty, and ignorance); - ubiquity which defines the geographic dispersion of potential damages (intragenerational justice); - persistency which defines the temporal extension of potential damages (intergenerational justice); - irreversibility which describes the impossible restoration of the situation to the state before the damage occurred (possible restoration are e.g. reforestation and cleaning of water); - delay effects which characterize the time of latency between the initial event and the actual impact of damage. The time of latency could be of physical, chemical or biological nature; and - potential of mobilization which is understood as violation of individual, social or cultural interests and values generating social conflicts and psychological reactions by affected people. (orig.)

  8. Risk-Informed SSCs Categorization: Elicitation Method of Expert's Opinion

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Mee Jeong; Yang, Joon Eon; Kim, Kil Yoo

    2005-01-15

    The regulations have been performing by deterministic way since nuclear power plants have been operating. However, some SSCs identified as safety-significance by deterministic way, were turned out to be low or non safety-significant and some SSCs identified as non-safety significance were turned out to be high safety-significant according to the results of PSA. Considering these risk insights, Regulatory Guide 1.174 and 10CFR50.69 were drawn up, and we can re-categorize the SSCs according to their safety significance. Therefore, a study and an interest about the risk-informed SSCs re-categorization and treatment has been continued. The objective of this regulatory initiative is to adjust the scope of equipment subject to special regulatory treatment to better focus licensee and regulatory attention and resources on equipment that has safety significance. Current most regulations define the plant equipment necessary to meet deterministic regulatory basis as 'safety-related.' This equipment is subject to special treatment regulations. Other plant equipment is categorized as 'non-safety related,' and is not subject to a select number of special treatment requirement or a subset of those requirement. However, risk information is not a magic tool making a decision but a supporting tool to categorize SSCs. This is because only small parts of a plant are modeled in PSA model. Thus, engineering and deterministic judgments are also used for risk-informed SSCs categorization, and expert opinion elicitation is very important for risk-informed SSCs categorization. Therefore, we need a rational method to elicit the expert's opinions, and in this study, we developed a systematic method for expert elicitation to categorize the nuclear power plants' SSCs. Current states for SSCs categorization of the USA and the existing methods for expert elicitation were surveyed and more systematic way eliciting the expert opinions and combining was developed. To

  9. AN EVALUATION OF RISK MANAGEMENT STRATEGIES FOR DAIRY FARMS

    OpenAIRE

    Bosch, Darrell J.; Johnson, Christian J.

    1992-01-01

    Variability in feed prices and crop yields are important sources of risk to dairy farmers. A simulation model of a representative dairy farm was used to evaluate crop insurance and hedging as risk management strategies. These strategies lowered expected net returns but also reduced risk. The preferred set of strategies at lower levels of risk aversion included hedging and crop insurance, although a base scenario in which no risk management strategies were employed was also efficient. The pref...

  10. Communicating radon risk effectively: a mid-course evaluation. Interim report

    International Nuclear Information System (INIS)

    Smith, V.K.; Desvousges, W.H.; Fisher, A.; Johnson, F.R.

    1987-07-01

    A panel of 2300 homeowners was divided into subgroups to test the effectiveness of six alternative ways of explaining the risk from naturally occurring radon gas. The research design focused on two dimensions: qualitative vs. quantitative and directive vs. evaluative. These characteristics led to 4 experimental booklets, which were compared with EPA's Citizen's Guide and a one-page fact sheet. The evaluation examined how much people learned about radon; whether they could form risk perceptions consistent with their home's measured radon level; and whether they felt they had enough information to make a decision about mitigation. The fact sheet did not perform well on any of these evaluation criteria. None of the five booklets clearly was best for all 3 evaluation criteria; the report discusses the implications for designing an effective radon-risk communication program

  11. Assessing risk of draft survey by AHP method

    Science.gov (United States)

    Xu, Guangcheng; Zhao, Kuimin; Zuo, Zhaoying; Liu, Gang; Jian, Binguo; Lin, Yan; Fan, Yukun; Wang, Fei

    2018-04-01

    The paper assesses the risks of vessel floating in the seawater for draft survey by using the analytic hierarchy process. On this basis, the paper established draft survey risk index from the view of draft reading, ballast water, fresh water, and calculation process and so on. Then the paper proposes the method to deal with risk assessment using one concrete sample.

  12. Study of a simplified method of evaluating the economic maintenance importance of components in nuclear power plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Takagi, Toshiyuki; Kodama, Noriko

    2014-01-01

    Safety risk importance of components in nuclear power plants has been evaluated based on the probabilistic risk assessment and used for the decisions in various plant managements. But economic risk importance of the components has not been discussed very much. Therefore, this paper discusses risk importance of the components from the viewpoint of plant economic efficiency and proposes a simplified evaluation method of the economic risk importance (or economic maintenance importance). As a result of consideration, the followings were obtained. (1) A unit cost of power generation is selected as a performance indicator and can be related to a failure rate of components in nuclear power plant which is a result of maintenance. (2) The economic maintenance importance has to major factors, i.e. repair cost at component failure and production loss associated with plant outage due to component failure. (3) The developed method enables easy understanding of economic impacts of plant shutdown or power reduction due to component failures on the plane which adopts the repair cost in vertical axis and the production loss in horizontal axis. (author)

  13. Risk evaluation of cosmic-ray exposure in long-term manned space mission

    International Nuclear Information System (INIS)

    Fujitaka, Kazunobu; Majima, Hideyuki; Ando, Koichi; Yasuda, Hiroshi; Suzuki, Masao

    1999-03-01

    Long-term manned space missions are planned to be implemented within the first two decades of the 21st century. The International Space Station (ISS) will be ready to run, and a plan to visit Mars is also under way. Humans will live in space for long periods of time and we are planning to do experiments in space to examine various aspects of space science. The main risk in long-term manned space missions is large exposure to space radiation. Human safety must be ensured in space where exposure to cosmic rays is almost 1 mSv a day. As such missions will inevitably result in significant exposure for astronauts, there is increasing need to protect them adequately based on both physical and biological knowledge. A good method to evaluate realistic risk associated with space missions will be in urgent demand. At the National Institute of Radiological Sciences (NIRS), Chiba, Japan, a research institutes of the Science Technology Agency of Japan, high energy cosmic radiation can be simulated only with heavy ion irradiation accelerated by the particle accelerator, Heavy Ion Medical Accelerator (HIMAC). Research to evaluate risk of space radiation, including physical measurement techniques, protective effects, biological effects and risk adjustment, aging, neuronal cell damage and cancer risk are undergoing. We organized a workshop of the latest topics and experimental results of physics and biology related to space radiation supported by Japan Science and Technology Corporation (JST). This workshop was held as a satellite meeting associated with the 32nd Committee on Space Research (COSPAR) Scientific Assembly (Nagoya, July 12-19th, 1998). This volume is an extended proceedings of the workshop. The proceedings contain six main subjects covering the latest information on Risk Evaluation of Cosmic-Ray Exposure in Long-Term Manned Space Mission'. 1. Risk Estimation of Heavy Ion Exposure in Space. 2. Low Dose-Rate Effects and Microbeam-Related Heavy Ions. 3. Chromosome and

  14. Risk Evaluation for CO2 Geosequestration in the Knox Supergroup, Illinois Basin Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hnottavange-Telleen, Ken; Leetaru, Hannes

    2014-09-30

    porous and permeable) injection depths within the overall formation. Less direct implications include the vertical position of the Potosi within the rock column and the absence of a laterally extensive shale caprock immediately overlying the Potosi. Based on modeling work done partly in association with this risk report, risks that should also be evaluated include the ability of available methods to predict and track the development of a CO2 plume as it migrates away from the injection point(s). The geologic and hydrodynamic uncertainties present risks that are compounded at the stage of acquiring necessary drilling and injection permits. It is anticipated that, in the future, a regional geologic study or CO2-emitter request may identify a small specific area as a prospective CCS project site. At that point, the FEPs lists provided in this report should be evaluated by experts for their relative levels of risk. A procedure for this evaluation is provided. The higher-risk FEPs should then be used to write project-specific scenarios that may themselves be evaluated for risk. Then, actions to reduce and to manage risk can be described and undertaken. The FEPs lists provided as Appendix 2 should not be considered complete, as potentially the most important risks are ones that have not yet been thought of. But these lists are intended to include the most important risk elements pertinent to a Potosi-target CCS project, and they provide a good starting point for diligent risk identification, evaluation, and management.

  15. Risk-based transfer responses to climate change, simulated through autocorrelated stochastic methods

    Science.gov (United States)

    Kirsch, B.; Characklis, G. W.

    2009-12-01

    Maintaining municipal water supply reliability despite growing demands can be achieved through a variety of mechanisms, including supply strategies such as temporary transfers. However, much of the attention on transfers has been focused on market-based transfers in the western United States largely ignoring the potential for transfers in the eastern U.S. The different legal framework of the eastern and western U.S. leads to characteristic differences between their respective transfers. Western transfers tend to be agricultural-to-urban and involve raw, untreated water, with the transfer often involving a simple change in the location and/or timing of withdrawals. Eastern transfers tend to be contractually established urban-to-urban transfers of treated water, thereby requiring the infrastructure to transfer water between utilities. Utilities require the tools to be able to evaluate transfer decision rules and the resulting expected future transfer behavior. Given the long-term planning horizons of utilities, potential changes in hydrologic patterns due to climate change must be considered. In response, this research develops a method for generating a stochastic time series that reproduces the historic autocorrelation and can be adapted to accommodate future climate scenarios. While analogous in operation to an autoregressive model, this method reproduces the seasonal autocorrelation structure, as opposed to assuming the strict stationarity produced by an autoregressive model. Such urban-to-urban transfers are designed to be rare, transient events used primarily during times of severe drought, and incorporating Monte Carlo techniques allows for the development of probability distributions of likely outcomes. This research evaluates a system risk-based, urban-to-urban transfer agreement between three utilities in the Triangle region of North Carolina. Two utilities maintain their own surface water supplies in adjoining watersheds and look to obtain transfers via

  16. Conceptual Model of Offshore Wind Environmental Risk Evaluation System

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Richard M.; Copping, Andrea E.; Van Cleve, Frances B.; Unwin, Stephen D.; Hamilton, Erin L.

    2010-06-01

    In this report we describe the development of the Environmental Risk Evaluation System (ERES), a risk-informed analytical process for estimating the environmental risks associated with the construction and operation of offshore wind energy generation projects. The development of ERES for offshore wind is closely allied to a concurrent process undertaken to examine environmental effects of marine and hydrokinetic (MHK) energy generation, although specific risk-relevant attributes will differ between the MHK and offshore wind domains. During FY10, a conceptual design of ERES for offshore wind will be developed. The offshore wind ERES mockup described in this report will provide a preview of the functionality of a fully developed risk evaluation system that will use risk assessment techniques to determine priority stressors on aquatic organisms and environments from specific technology aspects, identify key uncertainties underlying high-risk issues, compile a wide-range of data types in an innovative and flexible data organizing scheme, and inform planning and decision processes with a transparent and technically robust decision-support tool. A fully functional version of ERES for offshore wind will be developed in a subsequent phase of the project.

  17. Technical evaluation of methods for identifying chemotherapy-induced febrile neutropenia in healthcare claims databases

    OpenAIRE

    Weycker Derek; Sofrygin Oleg; Seefeld Kim; Deeter Robert G; Legg Jason; Edelsberg John

    2013-01-01

    Abstract Background Healthcare claims databases have been used in several studies to characterize the risk and burden of chemotherapy-induced febrile neutropenia (FN) and effectiveness of colony-stimulating factors against FN. The accuracy of methods previously used to identify FN in such databases has not been formally evaluated. Methods Data comprised linked electronic medical records from Geisinger Health System and healthcare claims data from Geisinger Health Plan. Subjects were classifie...

  18. Performance of Firth-and logF-type penalized methods in risk prediction for small or sparse binary data.

    Science.gov (United States)

    Rahman, M Shafiqur; Sultana, Mahbuba

    2017-02-23

    When developing risk models for binary data with small or sparse data sets, the standard maximum likelihood estimation (MLE) based logistic regression faces several problems including biased or infinite estimate of the regression coefficient and frequent convergence failure of the likelihood due to separation. The problem of separation occurs commonly even if sample size is large but there is sufficient number of strong predictors. In the presence of separation, even if one develops the model, it produces overfitted model with poor predictive performance. Firth-and logF-type penalized regression methods are popular alternative to MLE, particularly for solving separation-problem. Despite the attractive advantages, their use in risk prediction is very limited. This paper evaluated these methods in risk prediction in comparison with MLE and other commonly used penalized methods such as ridge. The predictive performance of the methods was evaluated through assessing calibration, discrimination and overall predictive performance using an extensive simulation study. Further an illustration of the methods were provided using a real data example with low prevalence of outcome. The MLE showed poor performance in risk prediction in small or sparse data sets. All penalized methods offered some improvements in calibration, discrimination and overall predictive performance. Although the Firth-and logF-type methods showed almost equal amount of improvement, Firth-type penalization produces some bias in the average predicted probability, and the amount of bias is even larger than that produced by MLE. Of the logF(1,1) and logF(2,2) penalization, logF(2,2) provides slight bias in the estimate of regression coefficient of binary predictor and logF(1,1) performed better in all aspects. Similarly, ridge performed well in discrimination and overall predictive performance but it often produces underfitted model and has high rate of convergence failure (even the rate is higher than that

  19. The evolution of credit risk: phenomena, methods and management

    OpenAIRE

    George A. Christodoulakis

    2007-01-01

    This paper summarizes the proceedings of a conference at the Bank of Greece on credit risk. The papers presented focused on innovations in risk management methods which contribute to systemic financial stability, calculation of capital adequacy in financial institutions as well as the validation of credit rating methods in the context of Basel II.

  20. Risk evaluation mitigation strategies: the evolution of risk management policy.

    Science.gov (United States)

    Hollingsworth, Kristen; Toscani, Michael

    2013-04-01

    The United States Food and Drug Administration (FDA) has the primary regulatory responsibility to ensure that medications are safe and effective both prior to drug approval and while the medication is being actively marketed by manufacturers. The responsibility for safe medications prior to marketing was signed into law in 1938 under the Federal Food, Drug, and Cosmetic Act; however, a significant risk management evolution has taken place since 1938. Additional federal rules, entitled the Food and Drug Administration Amendments Act, were established in 2007 and extended the government's oversight through the addition of a Risk Evaluation and Mitigation Strategy (REMS) for certain drugs. REMS is a mandated strategy to manage a known or potentially serious risk associated with a medication or biological product. Reasons for this extension of oversight were driven primarily by the FDA's movement to ensure that patients and providers are better informed of drug therapies and their specific benefits and risks prior to initiation. This article provides an historical perspective of the evolution of medication risk management policy and includes a review of REMS programs, an assessment of the positive and negative aspects of REMS, and provides suggestions for planning and measuring outcomes. In particular, this publication presents an overview of the evolution of the REMS program and its implications.

  1. Consumer behavior changing: methods of evaluation

    Directory of Open Access Journals (Sweden)

    Elīna Gaile-Sarkane

    2013-11-01

    Full Text Available The article is devoted to methods of analyses of consumer buying behavior as well as to evaluation of most important factors what influences consumer behavior. This research aims at investigations about the changes in consumer behavior caused by globalization and development of information technologies; it helps to understand the specific factors what should be taken into account in evaluation of consumer behavior. The authors employ well-established quantitative and qualitative methods of research: grouping, analysis, synthesis, expert method, statistic method, etc. Research findings disclosed that there is possibility to introduce new methods for evaluation of changing consumer behavior.

  2. Hazard evaluation and risk management

    International Nuclear Information System (INIS)

    Fritzsche, A.F.

    1986-01-01

    The eigth chapter deals with the actual handling of hazards. The principal issue concerns man's behaviour towards hazards as an individual formerly and today; the evaluation of expected results of both a positive and a negative kind as determined by the individual's values which may differ and vary greatly from one individual to the next. The evaluation of benefit and hazard as well as the risk management resulting from decision-taking are political processes in the democratic state. Formal decision-taking tools play a major role in this process which concerns such central issues like who will participate; how the decision is arrived at; the participation of citizens; specialist knowledge and participation of the general public. (HSCH) [de

  3. Psychological first aid following trauma: implementation and evaluation framework for high-risk organizations.

    Science.gov (United States)

    Forbes, David; Lewis, Virginia; Varker, Tracey; Phelps, Andrea; O'Donnell, Meaghan; Wade, Darryl J; Ruzek, Josef I; Watson, Patricia; Bryant, Richard A; Creamer, Mark

    2011-01-01

    International clinical practice guidelines for the management of psychological trauma recommend Psychological First Aid (PFA) as an early intervention for survivors of potentially traumatic events. These recommendations are consensus-based, and there is little published evidence assessing the effectiveness of PFA. This is not surprising given the nature of the intervention and the complicating factors involved in any evaluation of PFA. There is, nevertheless, an urgent need for stronger evidence evaluating its effectiveness. The current paper posits that the implementation and evaluation of PFA within high risk organizational settings is an ideal place to start. The paper provides a framework for a phasic approach to implementing PFA within such settings and presents a model for evaluating its effectiveness using a logic- or theory-based approach which considers both pre-event and post-event factors. Phases 1 and 2 of the PFA model are pre-event actions, and phases 3 and 4 are post-event actions. It is hoped that by using the Phased PFA model and evaluation method proposed in this paper, future researchers will begin to undertake the important task of building the evidence about the most effective approach to providing PFA in high risk organizational and community disaster settings.

  4. A human-machine interface evaluation method: A difficulty evaluation method in information searching (DEMIS)

    International Nuclear Information System (INIS)

    Ha, Jun Su; Seong, Poong Hyun

    2009-01-01

    A human-machine interface (HMI) evaluation method, which is named 'difficulty evaluation method in information searching (DEMIS)', is proposed and demonstrated with an experimental study. The DEMIS is based on a human performance model and two measures of attentional-resource effectiveness in monitoring and detection tasks in nuclear power plants (NPPs). Operator competence and HMI design are modeled to be most significant factors to human performance. One of the two effectiveness measures is fixation-to-importance ratio (FIR) which represents attentional resource (eye fixations) spent on an information source compared to importance of the information source. The other measure is selective attention effectiveness (SAE) which incorporates FIRs for all information sources. The underlying principle of the measures is that the information source should be selectively attended to according to its informational importance. In this study, poor performance in information searching tasks is modeled to be coupled with difficulties caused by poor mental models of operators or/and poor HMI design. Human performance in information searching tasks is evaluated by analyzing the FIR and the SAE. Operator mental models are evaluated by a questionnaire-based method. Then difficulties caused by a poor HMI design are evaluated by a focused interview based on the FIR evaluation and then root causes leading to poor performance are identified in a systematic way.

  5. A quantitative risk assessment model to evaluate effective border control measures for rabies prevention

    Science.gov (United States)

    Weng, Hsin-Yi; Wu, Pei-I; Yang, Ping-Cheng; Tsai, Yi-Lun; Chang, Chao-Chin

    2009-01-01

    Border control is the primary method to prevent rabies emergence. This study developed a quantitative risk model incorporating stochastic processes to evaluate whether border control measures could efficiently prevent rabies introduction through importation of cats and dogs using Taiwan as an example. Both legal importation and illegal smuggling were investigated. The impacts of reduced quarantine and/or waiting period on the risk of rabies introduction were also evaluated. The results showed that Taiwan’s current animal importation policy could effectively prevent rabies introduction through legal importation of cats and dogs. The median risk of a rabid animal to penetrate current border control measures and enter Taiwan was 5.33 × 10−8 (95th percentile: 3.20 × 10−7). However, illegal smuggling may pose Taiwan to the great risk of rabies emergence. Reduction of quarantine and/or waiting period would affect the risk differently, depending on the applied assumptions, such as increased vaccination coverage, enforced custom checking, and/or change in number of legal importations. Although the changes in the estimated risk under the assumed alternatives were not substantial except for completely abolishing quarantine, the consequences of rabies introduction may yet be considered to be significant in a rabies-free area. Therefore, a comprehensive benefit-cost analysis needs to be conducted before recommending these alternative measures. PMID:19822125

  6. Real-Time Risk and Fault Management in the Mission Evaluation Room for the International Space Station

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, W.R.; Novack, S.D.

    2003-05-30

    Effective anomaly resolution in the Mission Evaluation Room (MER) of the International Space Station (ISS) requires consideration of risk in the process of identifying faults and developing corrective actions. Risk models such as fault trees from the ISS Probabilistic Risk Assessment (PRA) can be used to support anomaly resolution, but the functionality required goes significantly beyond what the PRA could provide. Methods and tools are needed that can systematically guide the identification of root causes for on-orbit anomalies, and to develop effective corrective actions that address the event and its consequences without undue risk to the crew or the mission. In addition, an overall information management framework is needed so that risk can be systematically incorporated in the process, and effectively communicated across all the disciplines and levels of management within the space station program. The commercial nuclear power industry developed such a decision making framework, known as the critical safety function approach, to guide emergency response following the accident at Three Mile Island in 1979. This report identifies new methods, tools, and decision processes that can be used to enhance anomaly resolution in the ISS Mission Evaluation Room. Current anomaly resolution processes were reviewed to identify requirements for effective real-time risk and fault management. Experience gained in other domains, especially the commercial nuclear power industry, was reviewed to identify applicable methods and tools. Recommendations were developed for next-generation tools to support MER anomaly resolution, and a plan for implementing the recommendations was formulated. The foundation of the proposed tool set will be a ''Mission Success Framework'' designed to integrate and guide the anomaly resolution process, and to facilitate consistent communication across disciplines while focusing on the overriding importance of mission success.

  7. Real-Time Risk and Fault Management in the Mission Evaluation Room of the International Space Station

    Energy Technology Data Exchange (ETDEWEB)

    William R. Nelson; Steven D. Novack

    2003-05-01

    Effective anomaly resolution in the Mission Evaluation Room (MER) of the International Space Station (ISS) requires consideration of risk in the process of identifying faults and developing corrective actions. Risk models such as fault trees from the ISS Probablistic Risk Assessment (PRA) can be used to support anomaly resolution, but the functionality required goes significantly beyond what the PRA could provide. Methods and tools are needed that can systematically guide the identification of root causes for on-orbit anomalies, and to develop effective corrective actions that address the event and its consequences without undue risk to the crew or the mission. In addition, an overall information management framework is needed so that risk can be systematically incorporated in the process, and effectively communicated across all the disciplines and levels of management within the space station program. The commercial nuclear power industry developed such a decision making framework, known as the critical safety function approach, to guide emergency response following the accident at Three Mile Island in 1979. This report identifies new methods, tools, and decision processes that can be used to enhance anomaly resolution in the ISS Mission Evaluation Room. Current anomaly resolution processes were reviewed to identify requirements for effective real-time risk and fault management. Experience gained in other domains, especially the commercial nuclear power industry, was reviewed to identify applicable methods and tools. Recommendations were developed for next-generation tools to support MER anomaly resolution, and a plan for implementing the recommendations was formulated. The foundation of the proposed toolset will be a "Mission Success Framework" designed to integrate and guide the anomaly resolution process, and to facilitate consistent communication across disciplines while focusing on the overriding importance of mission success.

  8. Development of environmental risk assessment framework using index method

    International Nuclear Information System (INIS)

    Ali, M.W.; Wu, Y.

    2000-01-01

    This paper presents a newly developed framework for assessing the risk from events which are considered to be major accidents to the environment according to the classifications by the United Kingdom Department of Environment (DoE). The application of an environmental risk assessment framework using the newly developed index method is demonstrated by means of a case study. The framework makes use of Environmental Hazard Index (EHI) method by the United Kingdom AEA Technology for releases to river, but improves it by taking account to toxic dose rather than concentration; taking account of long-term effects including persistence and bio accumulation, not just short term effects; extending the method to all aspects of environment, not just rivers; and allowing account to be taken of design changes to mitigate the risk. The development of the framework has also led to a revision of the tolerability criteria to be used with the framework proposed earlier by weakness and recommend further work to improve this newly proposed environmental risk assessment framework. From the study, it is recommended that the environmental risk assessment framework be applied to a wide range of other case studies in order to further improve it. The framework should be modified to maintain consistency when the DoE revises its definitions of major accidents to the environment. Ease-of-use of the framework (and any other environmental framework) would be aided by the compilation of databases for environmental toxicity, river data and available consequence models. Further work could also be done to suggest methods of mitigating the risk and including them as numerical factors within method. (author)

  9. Chemical Mixtures Health Risk Assessment of Environmental Contaminants: Concepts, Methods, Applications

    Science.gov (United States)

    This problems-based, introductory workshop focuses on methods to assess health risks posed by exposures to chemical mixtures in the environment. Chemical mixtures health risk assessment methods continue to be developed and evolve to address concerns over health risks from multic...

  10. Evaluation of dysphagia risk, nutritional status and caloric intake in elderly patients with Alzheimer's

    Science.gov (United States)

    Goes, Vanessa Fernanda; Mello-Carpes, Pâmela Billig; de Oliveira, Lilian Oliveira; Hack, Jaqueline; Magro, Marcela; Bonini, Juliana Sartori

    2014-01-01

    Objective to evaluate the risk of dysphagia and its relationship with the stage of Alzheimer's Disease, as well as the relationship between the risk of dysphagia and nutritional status and caloric intake in elderly people with Alzheimer's disease. Methods the sample consisted of 30 subjects of both genders with probable Alzheimer's disease. The stage of the disease, nutritional status, energy intake, and risk of dysphagia were assessed. Results it was found that increased risk of dysphagia is associated with the advance in the stages of Alzheimer's disease and that even patients in the early stages of disease have a slight risk of developing dysphagia. No association was found between nutritional status and the risk of dysphagia. High levels of inadequate intake of micronutrients were also verified in the patients. Conclusion an association between dysphagia and the development of Alzheimer's disease was found. The results indicate the need to monitor the presence of dysphagia and the micronutrient intake in patients with Alzheimer's disease. PMID:26107841

  11. Evaluation of dysphagia risk, nutritional status and caloric intake in elderly patients with Alzheimer's

    Directory of Open Access Journals (Sweden)

    Vanessa Fernanda Goes

    2014-04-01

    Full Text Available OBJECTIVE: to evaluate the risk of dysphagia and its relationship with the stage of Alzheimer's Disease, as well as the relationship between the risk of dysphagia and nutritional status and caloric intake in elderly people with Alzheimer's disease.METHODS: the sample consisted of 30 subjects of both genders with probable Alzheimer's disease. The stage of the disease, nutritional status, energy intake, and risk of dysphagia were assessed.RESULTS: it was found that increased risk of dysphagia is associated with the advance in the stages of Alzheimer's disease and that even patients in the early stages of disease have a slight risk of developing dysphagia. No association was found between nutritional status and the risk of dysphagia. High levels of inadequate intake of micronutrients were also verified in the patients.CONCLUSION: an association between dysphagia and the development of Alzheimer's disease was found. The results indicate the need to monitor the presence of dysphagia and the micronutrient intake in patients with Alzheimer's disease.

  12. A New Pre-employment Functional Capacity Evaluation Predicts Longer-Term Risk of Musculoskeletal Injury in Healthy Workers

    OpenAIRE

    Legge, Jennifer; Burgess-Limerick, Robin; Peeters, Geeske

    2013-01-01

    Study Design. Prospective cohort study. Objective. To determine if a job-specific pre-employment functional assessment (PEFA) predicts musculoskeletal injury risk in healthy mineworkers. Summary of Background Data. Traditional methods of pre-employment screening, including radiography and medical screenings, are not valid predictors of occupational musculoskeletal injury risk. Short-form job-specific functional capacity evaluations are increasing in popularity, despite limited evidence of the...

  13. Studies report: methods for the evaluation and the prevention of accidental risks (DRA 35 - report Ω 11). Knowledge of solid fuels self-heating

    International Nuclear Information System (INIS)

    2005-02-01

    The aim of this document is to present a synthesis of the knowledge on risks bond to auto-heating phenomena which occur in solid fuels storage. It analyzes the role of some factors on the heating, and more specially the mass, temperature, oxygen content of the atmosphere and humidity. It presents a general methodology of risks evaluation and measures on the risks detection and prevention. (A.L.B.)

  14. Genetic toxicology at the crossroads-from qualitative hazard evaluation to quantitative risk assessment.

    Science.gov (United States)

    White, Paul A; Johnson, George E

    2016-05-01

    Applied genetic toxicology is undergoing a transition from qualitative hazard identification to quantitative dose-response analysis and risk assessment. To facilitate this change, the Health and Environmental Sciences Institute (HESI) Genetic Toxicology Technical Committee (GTTC) sponsored a workshop held in Lancaster, UK on July 10-11, 2014. The event included invited speakers from several institutions and the contents was divided into three themes-1: Point-of-departure Metrics for Quantitative Dose-Response Analysis in Genetic Toxicology; 2: Measurement and Estimation of Exposures for Better Extrapolation to Humans and 3: The Use of Quantitative Approaches in Genetic Toxicology for human health risk assessment (HHRA). A host of pertinent issues were discussed relating to the use of in vitro and in vivo dose-response data, the development of methods for in vitro to in vivo extrapolation and approaches to use in vivo dose-response data to determine human exposure limits for regulatory evaluations and decision-making. This Special Issue, which was inspired by the workshop, contains a series of papers that collectively address topics related to the aforementioned themes. The Issue includes contributions that collectively evaluate, describe and discuss in silico, in vitro, in vivo and statistical approaches that are facilitating the shift from qualitative hazard evaluation to quantitative risk assessment. The use and application of the benchmark dose approach was a central theme in many of the workshop presentations and discussions, and the Special Issue includes several contributions that outline novel applications for the analysis and interpretation of genetic toxicity data. Although the contents of the Special Issue constitutes an important step towards the adoption of quantitative methods for regulatory assessment of genetic toxicity, formal acceptance of quantitative methods for HHRA and regulatory decision-making will require consensus regarding the

  15. Evaluation of Seismic Risk of Siberia Territory

    Science.gov (United States)

    Seleznev, V. S.; Soloviev, V. M.; Emanov, A. F.

    The outcomes of modern geophysical researches of the Geophysical Survey SB RAS, directed on study of geodynamic situation in large industrial and civil centers on the territory of Siberia with the purpose of an evaluation of seismic risk of territories and prediction of origin of extreme situations of natural and man-caused character, are pre- sented in the paper. First of all it concerns the testing and updating of a geoinformation system developed by Russian Emergency Ministry designed for calculations regarding the seismic hazard and response to distructive earthquakes. The GIS database contains the catalogues of earthquakes and faults, seismic zonation maps, vectorized city maps, information on industrial and housing fund, data on character of building and popula- tion in inhabited places etc. The geoinformation system allows to solve on a basis of probabilistic approaches the following problems: - estimating the earthquake impact, required forces, facilities and supplies for life-support of injured population; - deter- mining the consequences of failures on chemical and explosion-dangerous objects; - optimization problems on assurance technology of conduct of salvage operations. Using this computer program, the maps of earthquake risk have been constructed for several seismically dangerous regions of Siberia. These maps display the data on the probable amount of injured people and relative economic damage from an earthquake, which can occur in various sites of the territory according to the map of seismic zona- tion. The obtained maps have allowed determining places where the detailed seismo- logical observations should be arranged. Along with it on the territory of Siberia the wide-ranging investigations with use of new methods of evaluation of physical state of industrial and civil establishments (buildings and structures, hydroelectric power stations, bridges, dams, etc.), high-performance detailed electromagnetic researches of ground conditions of city

  16. Applicability of preoperative nuclear morphometry to evaluating risk for cervical lymph node metastasis in oral squamous cell carcinoma.

    Directory of Open Access Journals (Sweden)

    Masaaki Karino

    Full Text Available BACKGROUND: We previously reported the utility of preoperative nuclear morphometry for evaluating risk for cervical lymph node metastases in tongue squamous cell carcinoma. The risk for lymph node metastasis in oral squamous cell carcinoma, however, is known to differ depending on the anatomical site of the primary tumor, such as the tongue, gingiva, mouth floor, and buccal mucosa. In this study, we evaluated the applicability of this morphometric technique to evaluating the risk for cervical lymph node metastasis in oral squamous cell carcinoma. METHODS: A digital image system was used to measure the mean nuclear area, mean nuclear perimeter, nuclear circular rate, ratio of nuclear length to width (aspect ratio, and nuclear area coefficient of variation (NACV. Relationships between these parameters and nodal status were evaluated by t-test and logistic regression analysis. RESULTS: Eighty-eight cases of squamous cell carcinoma (52 of the tongue, 25 of the gingiva, 4 of the buccal mucosa, and 7 of the mouth floor were included: 46 with positive node classification and 42 with negative node classification. Nuclear area and perimeter were significantly larger in node-positive cases than in node-negative cases; however, there were no significant differences in circular rate, aspect ratio, or NACV. We derived two risk models based on the results of multivariate analysis: Model 1, which identified age and mean nuclear area and Model 2, which identified age and mean nuclear perimeter. It should be noted that primary tumor site was not associated the pN-positive status. There were no significant differences in pathological nodal status by aspect ratio, NACV, or primary tumor site. CONCLUSION: Our method of preoperative nuclear morphometry may contribute valuable information to evaluations of the risk for lymph node metastasis in oral squamous cell carcinoma.

  17. Assessing the feasibility of the Healthy Life in Suriname Study: using advanced hemodynamics to evaluate cardiovascular risk

    Directory of Open Access Journals (Sweden)

    Jet Q. Aartman

    2017-06-01

    Full Text Available ABSTRACT Objectives To determine the feasibility of assessing population cardiovascular risk with advanced hemodynamics in the Healthy Life in Suriname (HELISUR study. Methods This was a preliminary study conducted in May – June 2012 using the Technical-Economic-Legal-Operational-Scheduling (TELOS method to assess the feasibility of the HELISUR—a large-scale, cross-sectional population study of cardiovascular risk factors and disease in Suriname. Suriname, a middle-income country in South America with a population of mostly African and Asian ethnicity, has a high risk of cardiovascular disease. A total of 135 volunteers 18 – 70 years of age participated. A health questionnaire was tested in a primary health care center, and non-invasive cardiovascular evaluations were performed in an academic health center. The cardiovascular evaluation included sitting, supine, and standing blood pressure, and intermediate endpoints, such as cardiac output, peripheral vascular resistance, pulse wave velocity, and augmentation index. Results The TELOS testing found that communicating by cellular phone was most effective for appointment adherence, and that completion of the questionnaire often required assistance from a trained interviewer; modifications to improve the clarity of the questions are recommended. Regarding the extended cardiovascular assessments of peripheral and central hemodynamics, the findings showed these to be technically and operationally feasible and well tolerated by participants, in terms of burden and duration. Conclusions Findings of this feasibility assessment indicate that large-scale, detailed evaluations of cardiovascular risk, including a questionnaire and advanced central and peripheral hemodynamics, are feasible in a high-risk population in a middle-income setting.

  18. Uncertainty evaluation methods for waste package performance assessment

    International Nuclear Information System (INIS)

    Wu, Y.T.; Nair, P.K.; Journel, A.G.; Abramson, L.R.

    1991-01-01

    This report identifies and investigates methodologies to deal with uncertainties in assessing high-level nuclear waste package performance. Four uncertainty evaluation methods (probability-distribution approach, bounding approach, expert judgment, and sensitivity analysis) are suggested as the elements of a methodology that, without either diminishing or enhancing the input uncertainties, can evaluate performance uncertainty. Such a methodology can also help identify critical inputs as a guide to reducing uncertainty so as to provide reasonable assurance that the risk objectives are met. This report examines the current qualitative waste containment regulation and shows how, in conjunction with the identified uncertainty evaluation methodology, a framework for a quantitative probability-based rule can be developed that takes account of the uncertainties. Current US Nuclear Regulatory Commission (NRC) regulation requires that the waste packages provide ''substantially complete containment'' (SCC) during the containment period. The term ''SCC'' is ambiguous and subject to interpretation. This report, together with an accompanying report that describes the technical considerations that must be addressed to satisfy high-level waste containment requirements, provides a basis for a third report to develop recommendations for regulatory uncertainty reduction in the ''containment''requirement of 10 CFR Part 60. 25 refs., 3 figs., 2 tabs

  19. Evaluation of Investment Risks in CBA with Monte Carlo Method

    Directory of Open Access Journals (Sweden)

    Jana Korytárová

    2015-01-01

    Full Text Available Investment decisions are at the core of any development strategy. Economic growth and welfare depend on productive capital, infrastructure, human capital, knowledge, total factor productivity and the quality of institutions. Decision-making process on the selection of suitable projects in the public sector is in some aspects more difficult than in the private sector. Evaluating projects on the basis of their financial profitability, where the basic parameter is the value of the potential profit, can be misleading in these cases. One of the basic objectives of the allocation of public resources is respecting of the 3E principle (Economy, Effectiveness, Efficiency in their whole life cycle. The life cycle of the investment projects consists of four main phases. The first pre-investment phase is very important for decision-making process whether to accept or reject a public project for its realization. A well-designed feasibility study as well as cost-benefit analysis (CBA in this phase are important assumptions for future success of the project. A future financial and economical CF which represent the fundamental basis for calculation of economic effectiveness indicators are formed and modelled in these documents. This paper deals with the possibility to calculate the financial and economic efficiency of the public investment projects more accurately by simulation methods used.

  20. Farm-level risk factors for Fasciola hepatica infection in Danish dairy cattle as evaluated by two diagnostic methods

    DEFF Research Database (Denmark)

    Takeuchi-Storm, Nao; Denwood, Matthew; Hansen, Tina Vicky Alstrup

    2017-01-01

    ) as a tool for diagnosis in Danish dairy cattle farms was assessed. This case-control study aimed to identify farm-level risk factors for fasciolosis in Danish dairy farms (> 50 animals slaughtered in 2013) using two diagnostic methods: recordings of liver condemnation at slaughter, and farm-level Fasciola...

  1. Color image definition evaluation method based on deep learning method

    Science.gov (United States)

    Liu, Di; Li, YingChun

    2018-01-01

    In order to evaluate different blurring levels of color image and improve the method of image definition evaluation, this paper proposed a method based on the depth learning framework and BP neural network classification model, and presents a non-reference color image clarity evaluation method. Firstly, using VGG16 net as the feature extractor to extract 4,096 dimensions features of the images, then the extracted features and labeled images are employed in BP neural network to train. And finally achieve the color image definition evaluation. The method in this paper are experimented by using images from the CSIQ database. The images are blurred at different levels. There are 4,000 images after the processing. Dividing the 4,000 images into three categories, each category represents a blur level. 300 out of 400 high-dimensional features are trained in VGG16 net and BP neural network, and the rest of 100 samples are tested. The experimental results show that the method can take full advantage of the learning and characterization capability of deep learning. Referring to the current shortcomings of the major existing image clarity evaluation methods, which manually design and extract features. The method in this paper can extract the images features automatically, and has got excellent image quality classification accuracy for the test data set. The accuracy rate is 96%. Moreover, the predicted quality levels of original color images are similar to the perception of the human visual system.

  2. Dynamic performances of the fallout radionuclides in the environment and related health risk evaluation

    International Nuclear Information System (INIS)

    Morisawa, Shinsuke

    2003-01-01

    The framework was developed for evaluating the cancer induction mortality risk due to the prolonged exposure to the fallout Sr-90 in the environment, which was released by the atmospheric nuclear detonation tests, through dietary intake by considering the effect of foods and feeds import to Japan. The risk evaluation framework presented was composed of three sub-models: the model foe evaluation of the global circulation of Sr-90, the model for evaluation of Sr-90 concentration in foods and dietary intake, and the model for the cancer induction mortality risk. The mortality risk by the radiation-induced leukemia was evaluated based on the NUREG/CR-4214 model. The model was applied on the reference Japanese for past half century to evaluate the historical variation of the health risks. The new framework is presented and discussed on their feasibility to apply on the health risk evaluation due to the low-level and prolonged exposure to radionuclides in the environment. The possibility to use some kind of bio-markers are discussed to evaluate the potential health risk in advance before the risk will be actually detected. (author)

  3. Methods of currency risk management in foreign trade

    Directory of Open Access Journals (Sweden)

    V.V. Ksendzuk

    2016-03-01

    Full Text Available Development of the country’s market national economy is closely connected with international economic relations. Therefore national business entities are actively involved in foreign trade, and their positive results influence not only on the status and income of owners, but form the economic potential of the country. The survey describes the main indicators of foreign trade and the impact of export and import transactions on economic development of Ukraine, particularly on the gross domestic income of the country. Taking into account also the negative trends in foreign currency exchange rates, the article considers the types of currency risks that accompany international transactions and identifies the limits of the usefulness of currency risk management methods. The methods of currency risk management are also systematized, the benefits of their use for the enterprise are considered and the status and readiness of Ukraine’s financial market to ensure appropriate conditions for the functioning of the currency risk management in domestic enterprises are analyzed.

  4. The comparison of cardiovascular risk scores using two methods of substituting missing risk factor data in patient medical records

    Directory of Open Access Journals (Sweden)

    Andrew Dalton

    2011-07-01

    Conclusions A simple method of substituting missing risk factor data can produce reliable estimates of CVD risk scores. Targeted screening for high CVD risk, using pre-existing electronic medical record data, does not require multiple imputation methods in risk estimation.

  5. Environmental risk evaluation to minimize impacts within the area affected by the Wenchuan earthquake

    International Nuclear Information System (INIS)

    Du, Pengfei; Chen, Jining; Chen, Chao; Liu, Yi; Liu, Jianguo; Wang, Hongtao; Zhang, Xiaojian

    2012-01-01

    Earthquakes can be devastating to built infrastructure and the natural environment, as evidenced by the March 2011, M = 9.0 earthquake, and subsequent tsunami, in Japan. As seen in the Japanese event, environmental damage caused by secondary disasters (tsunami, leakage from a nuclear reactor) can equal or exceed the impacts of the primary event. In order to develop an environmental assessment system to examine secondary disasters, a comprehensive environmental impact evaluation was conducted after the Wenchuan earthquake that occurred on 12 May 2008 in the Sichuan Province, China. This evaluation focused on several key environmental elements such as wastewater, drinking water, soil, solid waste, radiation, and ecosystem-level effects. As part of this assessment, an analysis of root causes and potential solutions was conducted for key issues such as population relocation and resettlement in temporary dwellings, recovery of environmental protection functions, industrial development strategies and production recovery. Methods for post-quake environmental assessment were developed, utilizing GIS-based techniques for spatial evaluation of primary and secondary disaster patterns. The goal of this exercise was the development of effective assessment methods that can be rapidly applied in a post-disaster situation to reduce and mitigate damage caused by secondary disasters, and facilitate the recovery of impaired environmental management structure and function. - Highlights: ► A comprehensive post-quake environmental risk evaluation system was developed. ► The research identifies potential long-term environmental risks in many aspects. ► The research analyzes potential solutions for many typical post-disaster issues. ► Effective assessment methods can be applied in a post-disaster situation to reduce damage caused by secondary disasters.

  6. Environmental risk evaluation to minimize impacts within the area affected by the Wenchuan earthquake

    Energy Technology Data Exchange (ETDEWEB)

    Du, Pengfei, E-mail: dupf@tsinghua.edu.cn; Chen, Jining, E-mail: jchen1@tsinghua.edu.cn; Chen, Chao, E-mail: chen_water@tsinghua.edu.cn; Liu, Yi, E-mail: yi.liu@tsinghua.edu.cn; Liu, Jianguo, E-mail: jgliu@tsinghua.edu.cn; Wang, Hongtao, E-mail: htwang@tsinghua.edu.cn; Zhang, Xiaojian, E-mail: zhangxj@tsinghua.edu.cn

    2012-03-01

    Earthquakes can be devastating to built infrastructure and the natural environment, as evidenced by the March 2011, M = 9.0 earthquake, and subsequent tsunami, in Japan. As seen in the Japanese event, environmental damage caused by secondary disasters (tsunami, leakage from a nuclear reactor) can equal or exceed the impacts of the primary event. In order to develop an environmental assessment system to examine secondary disasters, a comprehensive environmental impact evaluation was conducted after the Wenchuan earthquake that occurred on 12 May 2008 in the Sichuan Province, China. This evaluation focused on several key environmental elements such as wastewater, drinking water, soil, solid waste, radiation, and ecosystem-level effects. As part of this assessment, an analysis of root causes and potential solutions was conducted for key issues such as population relocation and resettlement in temporary dwellings, recovery of environmental protection functions, industrial development strategies and production recovery. Methods for post-quake environmental assessment were developed, utilizing GIS-based techniques for spatial evaluation of primary and secondary disaster patterns. The goal of this exercise was the development of effective assessment methods that can be rapidly applied in a post-disaster situation to reduce and mitigate damage caused by secondary disasters, and facilitate the recovery of impaired environmental management structure and function. - Highlights: Black-Right-Pointing-Pointer A comprehensive post-quake environmental risk evaluation system was developed. Black-Right-Pointing-Pointer The research identifies potential long-term environmental risks in many aspects. Black-Right-Pointing-Pointer The research analyzes potential solutions for many typical post-disaster issues. Black-Right-Pointing-Pointer Effective assessment methods can be applied in a post-disaster situation to reduce damage caused by secondary disasters.

  7. Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-09-01

    This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km{sup 2} (570-mi{sup 2}) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation.

  8. Evaluation of air pollution-related risks for Austrian mountain forests

    International Nuclear Information System (INIS)

    Smidt, Stefan; Herman, Friedl

    2004-01-01

    The present paper describes air pollution status and evaluation of risks related to effects of phytotoxic pollutants in the Austrian mountain forests. The results are based on Austrian networks (Forest Inventory, Forest Damage Monitoring System, Austrian Bioindicator Grid), the Austrian sample plots of the European networks of the UN-ECE (ICP Forests, Level I and Level II) and interdisciplinary research approaches. Based on the monitoring data and on modelling and mapping of Critical Thresholds, the evaluation of risk factors was possible. Cause-effect relationships between air pollution and tree responses were shown by tree-physiological measurements. Sulfur impact, proton and lead input, concentrations of nitrogen oxides, nitrogen input and ozone were evaluated. The risk was demonstrated at a regional and large-scale national level. Especially the increasing O 3 level and the accumulation of Pb with altitude present most serious risk for mountain forests. - Despite strong reduction of emissions in Europe, pollutants are still a potential stress factor, especially for sensitive mountain forest ecosystems in Austria

  9. Net Reclassification Indices for Evaluating Risk-Prediction Instruments: A Critical Review

    Science.gov (United States)

    Kerr, Kathleen F.; Wang, Zheyu; Janes, Holly; McClelland, Robyn L.; Psaty, Bruce M.; Pepe, Margaret S.

    2014-01-01

    Net reclassification indices have recently become popular statistics for measuring the prediction increment of new biomarkers. We review the various types of net reclassification indices and their correct interpretations. We evaluate the advantages and disadvantages of quantifying the prediction increment with these indices. For pre-defined risk categories, we relate net reclassification indices to existing measures of the prediction increment. We also consider statistical methodology for constructing confidence intervals for net reclassification indices and evaluate the merits of hypothesis testing based on such indices. We recommend that investigators using net reclassification indices should report them separately for events (cases) and nonevents (controls). When there are two risk categories, the components of net reclassification indices are the same as the changes in the true-positive and false-positive rates. We advocate use of true- and false-positive rates and suggest it is more useful for investigators to retain the existing, descriptive terms. When there are three or more risk categories, we recommend against net reclassification indices because they do not adequately account for clinically important differences in shifts among risk categories. The category-free net reclassification index is a new descriptive device designed to avoid pre-defined risk categories. However, it suffers from many of the same problems as other measures such as the area under the receiver operating characteristic curve. In addition, the category-free index can mislead investigators by overstating the incremental value of a biomarker, even in independent validation data. When investigators want to test a null hypothesis of no prediction increment, the well-established tests for coefficients in the regression model are superior to the net reclassification index. If investigators want to use net reclassification indices, confidence intervals should be calculated using bootstrap

  10. Evaluation of Basel III revision of quantitative standards for implementation of internal models for market risk

    Directory of Open Access Journals (Sweden)

    Meera Sharma

    2012-12-01

    Full Text Available This paper studies revisions under Basel III for market risk which allow conservative combination of short and long period Value-at-Risks (VaRs. This is the first study that examines this issue. The performance of the combination method is evaluated through regulatory back tests, unconditional and conditional coverage tests. The combination improves performance in regulatory back tests and tests of unconditional coverage. A common trend is the superior performance of long (1000/750 day in combination with short (190/125 days VaR methods. The combination does not enhance conditional coverage performance. This is the first study on this topic.

  11. A Rapid Monitoring and Evaluation Method of Schistosomiasis Based on Spatial Information Technology.

    Science.gov (United States)

    Wang, Yong; Zhuang, Dafang

    2015-12-12

    Thanks to Spatial Information Technologies (SITs) such as Remote Sensing (RS) and Geographical Information System (GIS) that are being quickly developed and updated, SITs are being used more widely in the public health field. The use of SITs to study the characteristics of the temporal and spatial distribution of Schistosoma japonicum and to assess the risk of infection provides methods for the control and prevention of schistosomiasis japonica has gradually become a hot topic in the field. The purpose of the present paper was to use RS and GIS technology to develop an efficient method of prediction and assessment of the risk of schistosomiasis japonica. We choose the Yueyang region, close to the east DongTing Lake (Hunan Province, China), as the study area, where a recent serious outbreak of schistosomiasis japonica took place. We monitored and evaluated the transmission risk of schistosomiasis japonica in the region using SITs. Water distribution data were extracted from RS images. The ground temperature, ground humidity and vegetation index were calculated based on RS images. Additionally, the density of oncomelania snails, which are the Schistosoma japonicum intermediate host, was calculated on the base of RS data and field measurements. The spatial distribution of oncomelania snails was explored using SITs in order to estimate the area surrounding the residents with transmission risk of schistosomiasis japonica. Our research result demonstrated: (1) the risk factors for the transmission of schistosomiasis japonica were closely related to the living environment of oncomelania snails. Key factors such as water distribution, ground temperature, ground humidity and vegetation index can be quickly obtained and calculated from RS images; (2) using GIS technology and a RS deduction technique along with statistical regression models, the density distribution model of oncomelania snails could be quickly built; (3) using SITs and analysis with overlaying population

  12. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  13. A method of risk assessment for a multi-plant site

    International Nuclear Information System (INIS)

    White, R.F.

    1983-06-01

    A model is presented which can be used in conjunction with probabilistic risk assessment to estimate whether a site on which there are several plants (reactors or chemical plants containing radioactive materials) meets whatever risk acceptance criteria or numerical risk guidelines are applied at the time of the assessment in relation to various groups of people and for various sources of risk. The application of the multi-plant site model to the direct and inverse methods of risk assessment is described. A method is proposed by which the potential hazard rating associated with a given plant can be quantified so that an appropriate allocation can be made when assessing the risks associated with each of the plants on a site. (author)

  14. A structured hazard analysis and risk assessment method for automotive systems—A descriptive study

    International Nuclear Information System (INIS)

    Beckers, Kristian; Holling, Dominik; Côté, Isabelle; Hatebur, Denis

    2017-01-01

    The 2011 release of the first version of the ISO 26262 standard for automotive systems demand the elicitation of safety goals following a rigorous method for hazard and risk analysis. Companies are struggling with the adoption of the standard due to ambiguities, documentation demands and the alignment of the standards demands to existing processes. We previously proposed a structured engineering method to deal with these problems developed in applying action research together with an OEM. In this work, we evaluate how applicable the method is for junior automotive software engineers by a descriptive study. We provided the method to 8 members of the master course Automotive Software Engineering (ASE) at the Technical University Munich. The participants have each been working in the automotive industry for 1–4 years in parallel to their studies. We investigated their application of our method to an electronic steering column lock system. The participants applied our method in a first round alone and afterwards discussed their results in groups. Our data analysis revealed that the participants could apply the method successfully and the hazard analysis and risk assessment achieved a high precision and productivity. Moreover, the precision could be improved significantly during group discussions.

  15. Farm-level risk factors for Fasciola hepatica infection in Danish dairy cattle as evaluated by two diagnostic methods

    DEFF Research Database (Denmark)

    Takeuchi-Storm, Nao; Denwood, Matthew; Hansen, Tina Vicky Alstrup

    2017-01-01

    ) as a tool for diagnosis in Danish dairy cattle farms was assessed. This case-control study aimed to identify farm-level risk factors for fasciolosis in Danish dairy farms (> 50 animals slaughtered in 2013) using two diagnostic methods: recordings of liver condemnation at slaughter, and farm-level Fasciola...... on wet pastures, dry cows grazing on wet pastures, herd size, breed and concurrent beef cattle production were identified as risk factors associated with being classified as a case farm. With the categorised BTM ELISA result as the response variable, heifers grazing on wet pastures, dry cows grazing...... on wet pastures, and purchase of cows were identified as risk factors. Within the case and control groups, 74.8 and 12.7% of farms were positive for fasciolosis on BTM ELISA, respectively. The differences are likely to be related to the detection limit of the farm-level prevalence by the BTM ELISA test...

  16. Forest fire risk assessment-an integrated approach based on multicriteria evaluation.

    Science.gov (United States)

    Goleiji, Elham; Hosseini, Seyed Mohsen; Khorasani, Nematollah; Monavari, Seyed Masoud

    2017-11-06

    The present study deals with application of the weighted linear combination method for zoning of forest fire risk in Dohezar and Sehezar region of Mazandaran province in northern Iran. In this study, the effective criteria for fires were identified by the Delphi method, and these included ecological and socioeconomic parameters. In this regard, the first step comprised of digital layers; the required data were provided from databases, related centers, and field data collected in the region. Then, the map of criteria was digitized in a geographic information system, and all criteria and indexes were normalized by fuzzy logic. After that, the geographic information system (GIS 10.3) was integrated with the Weighted Linear Combination and the Analytical Network Process, to produce zonation of the forest fire risk map in the Dohezar and Sehezar region. In order to analyze accuracy of the evaluation, the results obtained from the study were compared to records of former fire incidents in the region. This was done using the Kappa coefficient test and a receiver operating characteristic curve. The model showing estimations for forest fire risk explained that the prepared map had accuracy of 90% determined by the Kappa coefficient test and the value of 0.924 by receiver operating characteristic. These results showed that the prepared map had high accuracy and efficacy.

  17. U.S. Civil Air Show Crashes, 1993 to 2013: Burden, Fatal Risk Factors, and Evaluation of a Risk Index for Aviation Crashes.

    Science.gov (United States)

    Ballard, Sarah-Blythe; Osorio, Victor B

    2015-01-01

    This study provides new public health data about U.S. civil air shows. Risk factors for fatalities in civil air show crashes were analyzed. The value of the FIA score in predicting fatal outcomes was evaluated. With the use of the FAA's General Aviation and Air Taxi Survey and the National Transportation Safety Board's data, the incidence of civil air show crashes from 1993 to 2013 was calculated. Fatality risk factors for crashes were analyzed by means of regression methods. The FIA index was validated to predict fatal outcomes by using the factors of fire, instrument conditions, and away-from-airport location, and was evaluated through receiver operating characteristic (ROC) curves. The civil air show crash rate was 31 crashes per 1,000 civil air events. Of the 174 civil air show crashes that occurred during the study period, 91 (52%) involved at least one fatality; on average, 1.1 people died per fatal crash. Fatalities were associated with four major risk factors: fire [adjusted odds ratio (AOR) = 7.1, 95% confidence interval (CI) = 2.4 to 20.6, P Civil air show crashes were marked by a high risk of fatal outcomes to pilots in aerobatic performances but rare mass casualties. The FIA score was not a valid measurement of fatal risk in civil air show crashes.

  18. Systematic evaluation of observational methods assessing biomechanical exposures at work

    DEFF Research Database (Denmark)

    Takala, Esa-Pekka; Irmeli, Pehkonen; Forsman, Mikael

    2009-01-01

    by sorting the methods according to the several items evaluated.   Numerous methods have been developed to assess physical workload (biomechanical exposures) in order to identify hazards leading to musculoskeletal disorders, to monitor the effects of ergonomic changes, and for research. No indvidual method...... between observers Potential users NIOSH Lifting Eq. NA X - O, R Arbouw M - - O ACGIH Lifting TLV M - - O MAC - - M O, W(?) ManTRA - - - O, R(?),W(?) NZ Code for MH - - - O, W(?) Washington state ergonomic rule M X M O, W(?) BackEST ML - M R   Correspondence with valid reference: HM = High to moderate, L......), and Washington state model. MAC (UK), ManTRA (Australia), and New Zealand code are widely used for the assessment of risks in MMH but we did not found formal studies on validity of these methods. The inter-observer repeatability of MAC and the Washington state model has been found to be moderate. Back...

  19. Evaluation of machine learning algorithms for improved risk assessment for Down's syndrome.

    Science.gov (United States)

    Koivu, Aki; Korpimäki, Teemu; Kivelä, Petri; Pahikkala, Tapio; Sairanen, Mikko

    2018-05-04

    Prenatal screening generates a great amount of data that is used for predicting risk of various disorders. Prenatal risk assessment is based on multiple clinical variables and overall performance is defined by how well the risk algorithm is optimized for the population in question. This article evaluates machine learning algorithms to improve performance of first trimester screening of Down syndrome. Machine learning algorithms pose an adaptive alternative to develop better risk assessment models using the existing clinical variables. Two real-world data sets were used to experiment with multiple classification algorithms. Implemented models were tested with a third, real-world, data set and performance was compared to a predicate method, a commercial risk assessment software. Best performing deep neural network model gave an area under the curve of 0.96 and detection rate of 78% with 1% false positive rate with the test data. Support vector machine model gave area under the curve of 0.95 and detection rate of 61% with 1% false positive rate with the same test data. When compared with the predicate method, the best support vector machine model was slightly inferior, but an optimized deep neural network model was able to give higher detection rates with same false positive rate or similar detection rate but with markedly lower false positive rate. This finding could further improve the first trimester screening for Down syndrome, by using existing clinical variables and a large training data derived from a specific population. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. Literature Review on Modeling Cyber Networks and Evaluating Cyber Risks.

    Energy Technology Data Exchange (ETDEWEB)

    Kelic, Andjelka; Campbell, Philip L

    2018-04-01

    The National Infrastructure Simulations and Analysis Center (NISAC) conducted a literature review on modeling cyber networks and evaluating cyber risks. The literature review explores where modeling is used in the cyber regime and ways that consequence and risk are evaluated. The relevant literature clusters in three different spaces: network security, cyber-physical, and mission assurance. In all approaches, some form of modeling is utilized at varying levels of detail, while the ability to understand consequence varies, as do interpretations of risk. This document summarizes the different literature viewpoints and explores their applicability to securing enterprise networks.

  1. "System evaluates system": method for evaluating the efficiency of IS

    Directory of Open Access Journals (Sweden)

    Dita Blazkova

    2016-10-01

    Full Text Available In paper I deal with the possible solution of evaluating the efficiency of information systems in companies. The large number of existing methods used to address the efficiency of information systems is dependent on the subjective responses of the user that may distort output evaluation. Therefore, I propose a method that eliminates the subjective opinion of a user as the primary data source. Applications, which I suggests as part of the method, collects relevant data. In this paper I describe the application in detail. This is a follow-on program on any system that runs parallel with it. The program automatically collects data for evaluation. Data include mainly time data, positions the mouse cursor, printScreens, i-grams of previous, etc. I propose a method of evaluation of the data, which identifies the degree of the friendliness of the information system to the user. Thus, the output of the method is the conclusion whether users, who work with the information system, can handle effectively work with it.

  2. Liver function tests and risk prediction of incident type 2 diabetes : evaluation in two independent cohorts

    NARCIS (Netherlands)

    Abbasi, Ali; Bakker, Stephan J. L.; Corpeleijn, Eva; van der A, Daphne L.; Gansevoort, Ron T.; Gans, Rijk O. B.; Peelen, Linda M.; van der Schouw, Yvonne T.; Stolk, Ronald P.; Navis, Gerjan; Spijkerman, Annemieke M. W.; Beulens, Joline W. J.

    2012-01-01

    Background: Liver function tests might predict the risk of type 2 diabetes. An independent study evaluating utility of these markers compared with an existing prediction model is yet lacking. Methods and Findings: We performed a case-cohort study, including random subcohort (6.5%) from 38,379

  3. Classes evaluation: Methods and tools

    Directory of Open Access Journals (Sweden)

    Grabiński Tadeusz

    2013-01-01

    Full Text Available This study presents a method, tools, course and results of foreign language classes evaluation conducted in the summer semester 2012/2013 in the Andrzej Frycz - Modrzewski Krakow University. Because a new evaluation procedure has been implemented at the University, the former method - based on paper forms filled in by the students - was abandoned. On the surveyanyplace.com website, a free account has been registered and the form of the evaluation questionnaire has been inserted. This coverage presents results of a taxometric analysis aimed at checking the degree of mutual correspondence (correlation between certain criteria and instancing a graphic presentation of the evaluation results in a multidimensional perspective. In order to classify the grading criteria, the Ward's agglomerative method, along with Euclidean metric as a measure of criteria similarity, have been used. Calculations have been made with the use of Statistica package. Results of the questionnaire show that foreign language teaching at the Andrzej Frycz Modrzewski Krakow University is conducted professionally and on a high factual level.

  4. Concise method for evaluating the probability distribution of the marginal cost of power generation

    International Nuclear Information System (INIS)

    Zhang, S.H.; Li, Y.Z.

    2000-01-01

    In the developing electricity market, many questions on electricity pricing and the risk modelling of forward contracts require the evaluation of the expected value and probability distribution of the short-run marginal cost of power generation at any given time. A concise forecasting method is provided, which is consistent with the definitions of marginal costs and the techniques of probabilistic production costing. The method embodies clear physical concepts, so that it can be easily understood theoretically and computationally realised. A numerical example has been used to test the proposed method. (author)

  5. Deciding which chemical mixtures risk assessment methods work best for what mixtures

    International Nuclear Information System (INIS)

    Teuschler, Linda K.

    2007-01-01

    The most commonly used chemical mixtures risk assessment methods involve simple notions of additivity and toxicological similarity. Newer methods are emerging in response to the complexities of chemical mixture exposures and effects. Factors based on both science and policy drive decisions regarding whether to conduct a chemical mixtures risk assessment and, if so, which methods to employ. Scientific considerations are based on positive evidence of joint toxic action, elevated human exposure conditions or the potential for significant impacts on human health. Policy issues include legislative drivers that may mandate action even though adequate toxicity data on a specific mixture may not be available and risk assessment goals that impact the choice of risk assessment method to obtain the amount of health protection desired. This paper discusses three important concepts used to choose among available approaches for conducting a chemical mixtures risk assessment: (1) additive joint toxic action of mixture components; (2) toxicological interactions of mixture components; and (3) chemical composition of complex mixtures. It is proposed that scientific support for basic assumptions used in chemical mixtures risk assessment should be developed by expert panels, risk assessment methods experts, and laboratory toxicologists. This is imperative to further develop and refine quantitative methods and provide guidance on their appropriate applications. Risk assessors need scientific support for chemical mixtures risk assessment methods in the form of toxicological data on joint toxic action for high priority mixtures, statistical methods for analyzing dose-response for mixtures, and toxicological and statistical criteria for determining sufficient similarity of complex mixtures

  6. Gasbuggy Site Assessment and Risk Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-03-01

    The Gasbuggy site is in northern New Mexico in the San Juan Basin, Rio Arriba County (Figure 1-1). The Gasbuggy experiment was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation, a tight, gas-bearing sandstone formation. The 29-kiloton-yield nuclear device was placed in a 17.5-inch wellbore at 4,240 feet (ft) below ground surface (bgs), approximately 40 ft below the Pictured Cliffs/Lewis shale contact, in an attempt to force the cavity/chimney formed by the detonation up into the Pictured Cliffs Sandstone. The test was conducted below the southwest quarter of Section 36, Township 29 North, Range 4 West, New Mexico Principal Meridian. The device was detonated on December 10, 1967, creating a 335-ft-high chimney above the detonation point and a cavity 160 ft in diameter. The gas produced from GB-ER (the emplacement and reentry well) during the post-detonation production tests was radioactive and diluted, primarily by carbon dioxide. After 2 years, the energy content of the gas had recovered to 80 percent of the value of gas in conventionally developed wells in the area. There is currently no technology capable of remediating deep underground nuclear detonation cavities and chimneys. Consequently, the U.S. Department of Energy (DOE) must continue to manage the Gasbuggy site to ensure that no inadvertent intrusion into the residual contamination occurs. DOE has complete control over the 1/4 section (160 acres) containing the shot cavity, and no drilling is permitted on that property. However, oil and gas leases are on the surrounding land. Therefore, the most likely route of intrusion and potential exposure would be through contaminated natural gas or contaminated water migrating into a producing natural gas well outside the immediate vicinity of ground zero. The purpose of this report is to describe the current site conditions and evaluate the potential health risks posed by the most plausible

  7. Evaluating subway drivers’ exposure to whole body vibration based on Basic and VDV methods (with ISO 2631-1 standard

    Directory of Open Access Journals (Sweden)

    A. Khavanin

    2014-07-01

    Conclusion: Investigation of the result obtained from Basic method and VDV method manifested different amounts of vibration exposure in a way that VDV predicts higher level of risk, compared to basic method. The results shows that some presented indicators can not presented the safe zone in human vibration evaluations.

  8. Evaluating investments in renewable energy under policy risks

    International Nuclear Information System (INIS)

    Gatzert, Nadine; Vogl, Nikolai

    2016-01-01

    The considerable amount of required infrastructure and renewable energy investments expected in the forthcoming years also implies an increasingly relevant contribution of private and institutional investors. In this context, especially regulatory and policy risks have been shown to play a major role for investors when evaluating investments in renewable energy and should thus also be taken into account in risk assessment and when deriving risk-return profiles. In this paper, we provide a stochastic model framework to quantify policy risks associated with renewable energy investments (e.g. a retrospective reduction of a feed-in tariff), thereby also taking into account energy price risk, resource risk, and inflation risk. The model is illustrated by means of simulations and scenario analyses, and it makes use of expert estimates and fuzzy set theory for quantifying policy risks. Our numerical results for a portfolio of onshore wind farms in Germany and France show that policy risk can strongly impact risk-return profiles, and that cross-country diversification effects can considerably decrease the overall risk for investors. - Highlights: •Quantification of policy risks associated with renewable energy investments. •Results emphasize that policy risk has a major impact on risk and return. •Study of the cross-country diversification potential. •Cross-country diversification can considerably decrease the risk for an investor.

  9. 12 CFR 327.9 - Assessment risk categories and pricing methods.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Assessment risk categories and pricing methods... OF GENERAL POLICY ASSESSMENTS In General § 327.9 Assessment risk categories and pricing methods. (a... and a weighted average of CAMELS component ratings will be multiplied by a corresponding pricing...

  10. A novel method for assessing risks to pollinators from plant protection products using honeybees as a model species.

    Science.gov (United States)

    Barmaz, Stefania; Potts, Simon G; Vighi, Marco

    2010-10-01

    Pollination is one of the most important ecosystem services in agroecosystems and supports food production. Pollinators are potentially at risk being exposed to pesticides and the main route of exposure is direct contact, in some cases ingestion, of contaminated materials such as pollen, nectar, flowers and foliage. To date there are no suitable methods for predicting pesticide exposure for pollinators, therefore official procedures to assess pesticide risk are based on a Hazard Quotient. Here we develop a procedure to assess exposure and risk for pollinators based on the foraging behaviour of honeybees (Apis mellifera) and using this species as indicator representative of pollinating insects. The method was applied in 13 European field sites with different climatic, landscape and land use characteristics. The level of risk during the crop growing season was evaluated as a function of the active ingredients used and application regime. Risk levels were primarily determined by the agronomic practices employed (i.e. crop type, pest control method, pesticide use), and there was a clear temporal partitioning of risks through time. Generally the risk was higher in sites cultivated with permanent crops, such as vineyard and olive, than in annual crops, such as cereals and oil seed rape. The greatest level of risk is generally found at the beginning of the growing season for annual crops and later in June-July for permanent crops.

  11. Fuzzy comprehensive evaluation-based disaster risk assessment of desertification in Horqin Sand Land, China.

    Science.gov (United States)

    Wang, Yongfang; Zhang, Jiquan; Guo, Enliang; Sun, Zhongyi

    2015-02-03

    Desertification is a typical disaster risk event in which human settlements and living environments are destroyed. Desertification Disaster Risk Assessment can control and prevent the occurrence and development of desertification disasters and reduce their adverse influence on human society. This study presents the methodology and procedure for risk assessment and zoning of desertification disasters in Horqin Sand Land. Based on natural disaster risk theory and the desertification disaster formation mechanism, the Desertification Disaster Risk Index (DDRI) combined hazard, exposure, vulnerability and restorability factors and was developed mainly by using multi-source data and the fuzzy comprehensive evaluation method. The results showed that high risk and middle risk areas account for 28% and 23% of the study area, respectively. They are distributed with an "S" type in the study area. Low risk and very low risk areas account for 21% and 10% of the study area, respectively. They are distributed in the west-central and southwestern parts. Very high risk areas account for 18% of the study area and are distributed in the northeastern parts. The results can be used to know the desertification disaster risk level. It has important theoretical and practical significance to prevention and control of desertification in Horqin Sand Land and even in Northern China.

  12. Fuzzy Comprehensive Evaluation-Based Disaster Risk Assessment of Desertification in Horqin Sand Land, China

    Directory of Open Access Journals (Sweden)

    Yongfang Wang

    2015-02-01

    Full Text Available Desertification is a typical disaster risk event in which human settlements and living environments are destroyed. Desertification Disaster Risk Assessment can control and prevent the occurrence and development of desertification disasters and reduce their adverse influence on human society. This study presents the methodology and procedure for risk assessment and zoning of desertification disasters in Horqin Sand Land. Based on natural disaster risk theory and the desertification disaster formation mechanism, the Desertification Disaster Risk Index (DDRI combined hazard, exposure, vulnerability and restorability factors and was developed mainly by using multi-source data and the fuzzy comprehensive evaluation method. The results showed that high risk and middle risk areas account for 28% and 23% of the study area, respectively. They are distributed with an “S” type in the study area. Low risk and very low risk areas account for 21% and 10% of the study area, respectively. They are distributed in the west-central and southwestern parts. Very high risk areas account for 18% of the study area and are distributed in the northeastern parts. The results can be used to know the desertification disaster risk level. It has important theoretical and practical significance to prevention and control of desertification in Horqin Sand Land and even in Northern China.

  13. NDT method in determining the rate of corrosion applicable to risk based inspection

    International Nuclear Information System (INIS)

    Mohamed Hairul Hasmoni; Mohamad Pauzi Ismail; Ab Razak Hamzah

    2004-01-01

    Corrosion is a major problem in oil and gas industries, refineries and chemical process plants as the equipment is often exposed to corrosive environments or elevated temperature. Important equipment need to operate safely and reliably to avoid injuries to personnel and the public, and to prevent loss time and cost incurred due to loss of production and shutdown. The paper assess the approach in evaluating the technique of non-destructive testing (NDT) using Ultrasonic Testing (UT) in determining the rate of corrosion and remaining life of equipment applicable to Risk Based Inspection (RBI). Methods in determining the corrosion rate are presented using analytical method. Examples and data from MINT chiller water pipeline are presented to illustrate the application of these methods. (Author)

  14. Evaluation of Cardiovascular Risk Scores Applied to NASA's Astronant Corps

    Science.gov (United States)

    Jain, I.; Charvat, J. M.; VanBaalen, M.; Lee, L.; Wear, M. L.

    2014-01-01

    In an effort to improve cardiovascular disease (CVD) risk prediction, this analysis evaluates and compares the applicability of multiple CVD risk scores to the NASA Astronaut Corps which is extremely healthy at selection.

  15. Methods of assessment and management of enterprise risks

    Directory of Open Access Journals (Sweden)

    I. A. Kiseleva

    2017-01-01

    Full Text Available The article is devoted to the actual topic of our time – the management of business risks. An integral part of professional risk management is to identify the nature of the object of management in the sphere of economy. Since the domestic theory of risk management is under development, the problem of a clear comprehensive definition of risk becomes now of particular relevance. The article discusses the basic concepts of risk management; studied its components in the business activities; reflected system and risk management principles; The basic types of risks in business. A organizational and economic mechanism of enterprise risk assessment. Practical advice on risk management. Entrepreneurship without risk does not exist. With the development of market economy the specific entrepreneur determines the methods that will work, and they all lead to entrepreneurial risks. The level of threats on the market today, above the level of potential profits. It is concluded that it is impossible to increase revenue without increasing the risk or reduce risk without reducing income. The lower range of the probability distribution of expected returns relative to its mean value, the lower the risk associated with this operation. Avoid risk in business is almost impossible, but you can reduce this risk. And it depends on how professionally and correctly operates the entrepreneur, what kind of strategy he will choose to reduce the appearance of risk.

  16. Evaluation on lifetime risk in reinforced concrete structure; RC kozo no lifetime risk no hyoka ni kansuru kisoteki kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Suzuki, M. [Public Works Research Institute, Tsukuba (Japan); Adachi, H. [Taisei Corp., Tokyo (Japan); Akakura, Y. [Ministry of Transport, Tokyo (Japan); Ibayashi, K.; Ozaka, Y. [Tohoku Gakuin Univ., Sendai (Japan)

    1996-02-15

    To evaluate the risk during longevity of reinforced concrete structure subjected to earthquake motions, called lifetime risk, damage and safety were estimated by means of the earthquake risk analysis and earthquake response analysis. For the earthquake risk analysis, historical earthquake data with relatively low accuracy were efficiently taken into account, to determine the annual mean generation probability against the earthquake motion strength in ten main cities. A new damage index with load hysteresis was defined as an anti-earthquake evaluation index where accumulative damage is taken into consideration. Assuming that the damage transits from `certain state` to `certain state` every time the earthquake motion generates at the noticeable place, damage transition matrix expressing transition probability was calculated by using the results of earthquake risk analysis and the accumulative damage index. The lifetime risk was calculated from the damage transition matrix and the earthquake motion generation probability, to evaluate the safety. 21 refs., 10 figs., 8 tabs.

  17. Evaluating Process Effectiveness to Reduce Risk

    Science.gov (United States)

    Shepherd, Christena C.

    2017-01-01

    security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes

  18. Stochastic evaluation of tsunami inundation and quantitative estimating tsunami risk

    International Nuclear Information System (INIS)

    Fukutani, Yo; Anawat, Suppasri; Abe, Yoshi; Imamura, Fumihiko

    2014-01-01

    We performed a stochastic evaluation of tsunami inundation by using results of stochastic tsunami hazard assessment at the Soma port in the Tohoku coastal area. Eleven fault zones along the Japan trench were selected as earthquake faults generating tsunamis. The results show that estimated inundation area of return period about 1200 years had good agreement with that in the 2011 Tohoku earthquake. In addition, we evaluated quantitatively tsunami risk for four types of building; a reinforced concrete, a steel, a brick and a wood at the Soma port by combining the results of inundation assessment and tsunami fragility assessment. The results of quantitative estimating risk would reflect properly vulnerability of the buildings, that the wood building has high risk and the reinforced concrete building has low risk. (author)

  19. Critical Evaluation of the Linkage Between Tick-Based Risk Measures and the Occurrence of Lyme Disease Cases

    Science.gov (United States)

    Eisen, Lars; Eisen, Rebecca J.

    2018-01-01

    The nymphal stage of the blacklegged tick, Ixodes scapularis Say, is considered the primary vector to humans in the eastern United States of the Lyme disease spirochete Borrelia burgdorferi sensu stricto. The abundance of infected host-seeking nymphs is commonly used to estimate the fundamental risk of human exposure to B. burgdorferi, for the purpose of environmental risk assessment and as an outcome measure when evaluating environmentally based tick or pathogen control methods. However, as this tick-based risk measure does not consider the likelihoods of either human encounters with infected ticks or tick bites resulting in pathogen transmission, its linkage to the occurrence of Lyme disease cases is worth evaluating. In this Forum article, we describe different tick-based risk measures, discuss their strengths and weaknesses, and review the evidence for their capacity to predict the occurrence of Lyme disease cases. We conclude that: 1) the linkage between abundance of host-seeking B. burgdorferi-infected nymphs and Lyme disease occurrence is strong at community or county scales but weak at the fine spatial scale of residential properties where most human exposures to infected nymphs occur in Northeast, 2) the combined use of risk measures based on infected nymphs collected from the environment and ticks collected from humans is preferable to either one of these risk measures used singly when assessing the efficacy of environmentally based tick or pathogen control methods aiming to reduce the risk of human exposure to B. burgdorferi, 3) there is a need for improved risk assessment methodology for residential properties that accounts for both the abundance of infected nymphs and the likelihood of human–tick contact, and 4) we need to better understand how specific human activities conducted in defined residential microhabitats relate to risk for nymphal exposures and bites. PMID:27330093

  20. User's guide to the repository intrusion risk evaluation code INTRUDE

    International Nuclear Information System (INIS)

    Nancarrow, D.J.; Thorne, M.C.

    1986-05-01

    The report, commissioned by the Department of the Environment as part of its radioactive waste management research programme, constitutes the user's guide to the repository intrusion risk evaluation code INTRUDE. It provides an explanation of the mathematical basis of the code, the database used and the operation of the code. INTRUDE is designed to facilitate the estimation of individual risks arising from the possibility of intrusion into shallow land burial facilities for radioactive wastes. It considers a comprehensive inventory of up to 65 long-lived radionuclides and produces risk estimates for up to 20 modes of intrusion and up to 50 times of evaluation. (author)

  1. Multi Criteria Evaluation Module for RiskChanges Spatial Decision Support System

    Science.gov (United States)

    Olyazadeh, Roya; Jaboyedoff, Michel; van Westen, Cees; Bakker, Wim

    2015-04-01

    Multi-Criteria Evaluation (MCE) module is one of the five modules of RiskChanges spatial decision support system. RiskChanges web-based platform aims to analyze changes in hydro-meteorological risk and provides tools for selecting the best risk reduction alternative. It is developed under CHANGES framework (changes-itn.eu) and INCREO project (increo-fp7.eu). MCE tool helps decision makers and spatial planners to evaluate, sort and rank the decision alternatives. The users can choose among different indicators that are defined within the system using Risk and Cost Benefit analysis results besides they can add their own indicators. Subsequently the system standardizes and prioritizes them. Finally, the best decision alternative is selected by using the weighted sum model (WSM). The Application of this work is to facilitate the effect of MCE for analyzing changing risk over the time under different scenarios and future years by adopting a group decision making into practice and comparing the results by numeric and graphical view within the system. We believe that this study helps decision-makers to achieve the best solution by expressing their preferences for strategies under future scenarios. Keywords: Multi-Criteria Evaluation, Spatial Decision Support System, Weighted Sum Model, Natural Hazard Risk Management

  2. Utilization of probabilistic methods for evaluating the safety of PWRs built in France

    International Nuclear Information System (INIS)

    Queniart, D.; Brisbois, J.; Lanore, J.M.

    1985-01-01

    Firstly, it is recalled that, in France, PWRs are designed on a deterministic basis by studying the consequences of a limited number of conventional incidents whose estimated frequency is specified in order-of-magnitude terms and for which it is shown that the consequences, for each category of frequency, predominate over those of the other situations in the same category. These situations are called dimensioning situations. The paper then describes the use made of probabilistic methods. External attacks and loss of redundant systems are examined in particular. A probabilistic approach is in fact well suited to the evaluation of risks due, among other things, to aircraft crashes and the industrial environment. Analysis of the reliability of redundant systems has shown that, in the light of the overall risk assessment objective, their loss should be examined with a view to instituting counteraction to reduce the risks associated with such loss (particularly the introduction of special control procedures). Probabilistic methods are used to evaluate the effectiveness of the counteraction proposed and such a study has been carried out for total loss of electric power supply. Finally, the probabilistic study of hazard initiated post factum by the French safety authorities for the standardized 900 MW(e) power units is described. The study, which is not yet complete, will serve as the basis for a permanent safety analysis tool taking into account control procedures and the total operating experience acquired using these power units. (author)

  3. A review of cyber security risk assessment methods for SCADA systems

    OpenAIRE

    Cherdantseva, Yulia; Burnap, Peter; Blyth, Andrew; Eden, Peter; Jones, Kevin; Soulsby, Hugh; Stoddart, Kristan

    2016-01-01

    This paper reviews the state of the art in cyber security risk assessment of Supervisory Control and Data Acquisition (SCADA) systems. We select and in-detail examine twenty-four risk assessment methods developed for or applied in the context of a SCADA system. We describe the essence of the methods and then analyse them in terms of aim; application domain; the stages of risk management addressed; key risk management concepts covered; impact measurement; sources of probabilistic data; evaluat...

  4. Experience of the use of comparative evaluations of risks in the public discussion about nuclear energy

    International Nuclear Information System (INIS)

    Borsch, P.

    1983-01-01

    In the nuclear controversy the risks of nuclear facilities play a major role. An evaluation of these risks is possible only by comparison with other risks to which people are exposed. For this purpose the selection of suitable comparative risk sources is important. But even if appropriate risk sources have been chosen, there will always be some rest dimensions which are difficult to encompass into the comparison. Among these problems are: the maximum damage, the time frame, the practical experience with a risk source, the different composition of the risk (death, injuries, cancers etc.), the uncertainty of risk assessment results, especially for chronic and late effects. One has to pay attention to these obstacles of comparing risks in the public discussion. Experience shows that risk comparison will be easier accepted if one explicitly refers to this difficulty. Also the different components of risks have to be presented, at least from its basic concept. An interesting possibility is the comparison of different risks with regard to their shortening of life expectancy. This common delimiter has to be used with care, since some comparisons decrease the probability of public acceptance for this method. Nevertheless this method provides a good illustration, of how small e.g. the risk of low doses of ionizing radiation is in comparison to smoking cigarettes. In any case it has to be pointed out that risk is not the only criterion for decisions about a technology, but that other factors like economics, fuel supply, degree of technical development have to be taken into account

  5. Diagnosis and Tests: Evaluating a Fall or Risk of Falling

    Science.gov (United States)

    ... as a physical therapist, who can evaluate your fall risk. If your healthcare provider concludes that you are ... to check for things that can impact your fall risk, such as electrolyte balance and the possibility of ...

  6. Evaluation of self-combustion risk in tire derived aggregate fills.

    Science.gov (United States)

    Arroyo, Marcos; San Martin, Ignacio; Olivella, Sebastian; Saaltink, Maarten W

    2011-01-01

    Lightweight tire derived aggregate (TDA) fills are a proven recycling outlet for waste tires, requiring relatively low cost waste processing and being competitively priced against other lightweight fill alternatives. However its value has been marred as several TDA fills have self-combusted during the early applications of this technique. An empirical review of these cases led to prescriptive guidelines from the ASTM aimed at avoiding this problem. This approach has been successful in avoiding further incidents of self-combustion. However, at present there remains no rational method available to quantify self-combustion risk in TDA fills. This means that it is not clear which aspects of the ASTM guidelines are essential and which are accessory. This hinders the practical use of TDA fills despite their inherent advantages as lightweight fill. Here a quantitative approach to self-combustion risk evaluation is developed and illustrated with a parametric analysis of an embankment case. This is later particularized to model a reported field self-combustion case. The approach is based on the available experimental observations and incorporates well-tested methodological (ISO corrosion evaluation) and theoretical tools (finite element analysis of coupled heat and mass flow). The results obtained offer clear insights into the critical aspects of the problem, allowing already some meaningful recommendations for guideline revision. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. An approach to assessing risk in coalbed methane prospect evaluation

    International Nuclear Information System (INIS)

    Vanorsdale, C.R.

    1991-01-01

    The economic evaluation of drilling prospects requires assessing the degree of risk involved and its impact on reserve estimates. In developed areas, risk can be determined in a fairly straightforward manner. In remote wildcat areas, risk can almost never be adequately identified or quantified. Between these extremes lie complex reservoirs -- reservoirs to heterogeneous that each well drilled could exhibit production characteristics unlike those of its neighbors. This paper illustrates the use of a risk assessment methodology in a case study of Fruitland coal prospects in the San Juan Basin of New Mexico. This approach could be applied to coalbed methane prospects or any unconventional or highly heterogeneous reservoir with appropriate modification. The utility of this approach is made apparent in a graphical analysis that relates reserves, rate of return and payout time for managerial or financial presentation. This graphical technique and the underlying risk assessment were used to aid a conservative management team in evaluating participation in a multi-well coalbed project

  8. Credit Risk Evaluation System: An Artificial Neural Network Approach

    African Journals Online (AJOL)

    On the other hand, this kind of bank's activity is connected with high risk as big amount of bad decisions may even cause bankruptcy. The key problem consists of distinguishing good (that surely repay) and bad (that likely default) credit applicants. Credit risk evaluation is an important and interesting management science ...

  9. Offshore wind turbine risk quantification/evaluation under extreme environmental conditions

    International Nuclear Information System (INIS)

    Taflanidis, Alexandros A.; Loukogeorgaki, Eva; Angelides, Demos C.

    2013-01-01

    A simulation-based framework is discussed in this paper for quantification/evaluation of risk and development of automated risk assessment tools, focusing on applications to offshore wind turbines under extreme environmental conditions. The framework is founded on a probabilistic characterization of the uncertainty in the models for the excitation, the turbine and its performance. Risk is then quantified as the expected value of some risk consequence measure over the probability distributions considered for the uncertain model parameters. Stochastic simulation is proposed for the risk assessment, corresponding to the evaluation of some associated probabilistic integral quantifying risk, as it allows for the adoption of comprehensive computational models for describing the dynamic turbine behavior. For improvement of the computational efficiency, a surrogate modeling approach is introduced based on moving least squares response surface approximations. The assessment is also extended to a probabilistic sensitivity analysis that identifies the importance of each of the uncertain model parameters, i.e. risk factors, towards the total risk as well as towards each of the failure modes contributing to this risk. The versatility and computational efficiency of the advocated approaches is finally exploited to support the development of standalone risk assessment applets for automated implementation of the probabilistic risk quantification/assessment. -- Highlights: ► A simulation-based risk quantification/assessment framework is discussed. ► Focus is on offshore wind turbines under extreme environmental conditions. ► Approach is founded on probabilistic description of excitation/system model parameters. ► Surrogate modeling is adopted for improved computational efficiency. ► Standalone risk assessment applets for automated implementation are supported

  10. Credit Institutions Management Evaluation using Quantitative Methods

    Directory of Open Access Journals (Sweden)

    Nicolae Dardac

    2006-02-01

    Full Text Available Credit institutions supervising mission by state authorities is mostly assimilated with systemic risk prevention. In present, the mission is orientated on analyzing the risk profile of the credit institutions, the mechanism and existing systems as management tools providing to bank rules the proper instruments to avoid and control specific bank risks. Rating systems are sophisticated measurement instruments which are capable to assure the above objectives, such as success in banking risk management. The management quality is one of the most important elements from the set of variables used in the quoting process in credit operations. Evaluation of this quality is – generally speaking – fundamented on quantitative appreciations which can induce subjectivism and heterogeneity in quotation. The problem can be solved by using, complementary, quantitative technics such us DEA (Data Envelopment Analysis.

  11. Success tree method of resources evaluation

    International Nuclear Information System (INIS)

    Chen Qinglan; Sun Wenpeng

    1994-01-01

    By applying the reliability theory in system engineering, the success tree method is used to transfer the expert's recognition on metallogenetic regularities into the form of the success tree. The aim of resources evaluation is achieved by means of calculating the metallogenetic probability or favorability of the top event of the success tree. This article introduces in detail, the source, principle of the success tree method and three kinds of calculation methods, expounds concretely how to establish the success tree of comprehensive uranium metallogenesis as well as the procedure from which the resources evaluation is performed. Because this method has not restrictions on the number of known deposits and calculated area, it is applicable to resources evaluation for different mineral species, types and scales and possesses good prospects of development

  12. LNG Safety Assessment Evaluation Methods

    Energy Technology Data Exchange (ETDEWEB)

    Muna, Alice Baca [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); LaFleur, Angela Christine [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-05-01

    Sandia National Laboratories evaluated published safety assessment methods across a variety of industries including Liquefied Natural Gas (LNG), hydrogen, land and marine transportation, as well as the US Department of Defense (DOD). All the methods were evaluated for their potential applicability for use in the LNG railroad application. After reviewing the documents included in this report, as well as others not included because of repetition, the Department of Energy (DOE) Hydrogen Safety Plan Checklist is most suitable to be adapted to the LNG railroad application. This report was developed to survey industries related to rail transportation for methodologies and tools that can be used by the FRA to review and evaluate safety assessments submitted by the railroad industry as a part of their implementation plans for liquefied or compressed natural gas storage ( on-board or tender) and engine fueling delivery systems. The main sections of this report provide an overview of various methods found during this survey. In most cases, the reference document is quoted directly. The final section provides discussion and a recommendation for the most appropriate methodology that will allow efficient and consistent evaluations to be made. The DOE Hydrogen Safety Plan Checklist was then revised to adapt it as a methodology for the Federal Railroad Administration’s use in evaluating safety plans submitted by the railroad industry.

  13. Quantitative, Qualitative and Geospatial Methods to Characterize HIV Risk Environments.

    Directory of Open Access Journals (Sweden)

    Erin E Conners

    Full Text Available Increasingly, 'place', including physical and geographical characteristics as well as social meanings, is recognized as an important factor driving individual and community health risks. This is especially true among marginalized populations in low and middle income countries (LMIC, whose environments may also be more difficult to study using traditional methods. In the NIH-funded longitudinal study Mapa de Salud, we employed a novel approach to exploring the risk environment of female sex workers (FSWs in two Mexico/U.S. border cities, Tijuana and Ciudad Juárez. In this paper we describe the development, implementation, and feasibility of a mix of quantitative and qualitative tools used to capture the HIV risk environments of FSWs in an LMIC setting. The methods were: 1 Participatory mapping; 2 Quantitative interviews; 3 Sex work venue field observation; 4 Time-location-activity diaries; 5 In-depth interviews about daily activity spaces. We found that the mixed-methodology outlined was both feasible to implement and acceptable to participants. These methods can generate geospatial data to assess the role of the environment on drug and sexual risk behaviors among high risk populations. Additionally, the adaptation of existing methods for marginalized populations in resource constrained contexts provides new opportunities for informing public health interventions.

  14. Chemical Mixtures Health Risk Assessment of Environmental Contaminants: Concepts, Methods, And Applications

    Science.gov (United States)

    This problems-based, introductory workshop focuses on methods to assess health risks posed by exposures to chemical mixtures in the environment. Chemical mixtures health risk assessment methods continue to be developed and evolve to address concerns over health risks from multic...

  15. The development of a 3D risk analysis method.

    Science.gov (United States)

    I, Yet-Pole; Cheng, Te-Lung

    2008-05-01

    Much attention has been paid to the quantitative risk analysis (QRA) research in recent years due to more and more severe disasters that have happened in the process industries. Owing to its calculation complexity, very few software, such as SAFETI, can really make the risk presentation meet the practice requirements. However, the traditional risk presentation method, like the individual risk contour in SAFETI, is mainly based on the consequence analysis results of dispersion modeling, which usually assumes that the vapor cloud disperses over a constant ground roughness on a flat terrain with no obstructions and concentration fluctuations, which is quite different from the real situations of a chemical process plant. All these models usually over-predict the hazardous regions in order to maintain their conservativeness, which also increases the uncertainty of the simulation results. On the other hand, a more rigorous model such as the computational fluid dynamics (CFD) model can resolve the previous limitations; however, it cannot resolve the complexity of risk calculations. In this research, a conceptual three-dimensional (3D) risk calculation method was proposed via the combination of results of a series of CFD simulations with some post-processing procedures to obtain the 3D individual risk iso-surfaces. It is believed that such technique will not only be limited to risk analysis at ground level, but also be extended into aerial, submarine, or space risk analyses in the near future.

  16. A universal meteorological method to identify potential risk of wind erosion on heavy-textured soils

    Directory of Open Access Journals (Sweden)

    Středová Hana

    2015-06-01

    Full Text Available The climate of Central Europe, mainly winter seasons with no snow cover at lower altitudes and a spring drought as well, might cause erosion events on heavy-textured soils. The aim of this paper is to define a universal method to identify the potential risk of wind erosion on heavy-textured soils. The categorization of potential wind erosion risk due to meteorological conditions is based on: (i an evaluation of the number of freeze-thaw episodes forming bare soil surfaces during the cold period of year; and (ii, an evaluation of the number of days with wet soil surfaces during the cold period of year. In the period 2001–2012 (from November to March, episodes with temperature changes from positive to negative and vice versa (thaw-freeze and freeze-thaw cycles and the effects of wet soil surfaces in connection with aggregate disintegration, are identified. The data are spatially interpolated by GIS tools for areas in the Czech Republic with heavy-textured soils. Blending critical categories is used to locate potential risks. The level of risk is divided into six classes. Those areas identified as potentially most vulnerable are the same localities where the highest number of erosive episodes on heavy-textured soils was documented.

  17. A strategy for evaluating pathway analysis methods.

    Science.gov (United States)

    Yu, Chenggang; Woo, Hyung Jun; Yu, Xueping; Oyama, Tatsuya; Wallqvist, Anders; Reifman, Jaques

    2017-10-13

    Researchers have previously developed a multitude of methods designed to identify biological pathways associated with specific clinical or experimental conditions of interest, with the aim of facilitating biological interpretation of high-throughput data. Before practically applying such pathway analysis (PA) methods, we must first evaluate their performance and reliability, using datasets where the pathways perturbed by the conditions of interest have been well characterized in advance. However, such 'ground truths' (or gold standards) are often unavailable. Furthermore, previous evaluation strategies that have focused on defining 'true answers' are unable to systematically and objectively assess PA methods under a wide range of conditions. In this work, we propose a novel strategy for evaluating PA methods independently of any gold standard, either established or assumed. The strategy involves the use of two mutually complementary metrics, recall and discrimination. Recall measures the consistency of the perturbed pathways identified by applying a particular analysis method to an original large dataset and those identified by the same method to a sub-dataset of the original dataset. In contrast, discrimination measures specificity-the degree to which the perturbed pathways identified by a particular method to a dataset from one experiment differ from those identifying by the same method to a dataset from a different experiment. We used these metrics and 24 datasets to evaluate six widely used PA methods. The results highlighted the common challenge in reliably identifying significant pathways from small datasets. Importantly, we confirmed the effectiveness of our proposed dual-metric strategy by showing that previous comparative studies corroborate the performance evaluations of the six methods obtained by our strategy. Unlike any previously proposed strategy for evaluating the performance of PA methods, our dual-metric strategy does not rely on any ground truth

  18. Evaluating intergenerational risks: Probabillity adjusted rank-discounted utilitarianism

    OpenAIRE

    Asheim, Geir B.; Zuber, Stéphane

    2015-01-01

    Climate policies have stochastic consequences that involve a great number of generations. This calls for evaluating social risk (what kind of societies will future people be born into) rather than individual risk (what will happen to people during their own lifetimes). As a response we propose and axiomatize probability adjusted rank-discounted critical-level generalized utilitarianism (PARDCLU), through a key axiom that requires that the social welfare order both be ethical and satisfy first...

  19. Risk evaluation and mitigation strategies: a focus on belatacept.

    Science.gov (United States)

    Sam, Teena; Gabardi, Steven; Tichy, Eric M

    2013-03-01

    To review the elements and components of the risk evaluation and mitigation strategies (REMS) for the costimulation blocker belatacept and associated implications for health care providers working with transplant recipients. The MEDLINE and EMBASE databases (January 1990 to March 2012) were searched by using risk evaluation and mitigation strategies, REMS, belatacept, and organ transplant as search terms (individual organs were also searched). Retrieved articles were supplemented with analysis of information obtained from the Federal Register, the Food and Drug Administration, and the manufacturer of belatacept. REMS are risk-management strategies implemented to ensure that a product's benefits outweigh its known safety risks. Although belatacept offers a novel strategy in maintenance immunosuppression and was associated with superior renal function compared with cyclosporine in phase 2 and 3 trials, belatacept is also associated with increased risk of posttransplant lymphoproliferative disorder and central nervous system infections. The Food and Drug Administration required development of a REMS program as part of belatacept's approval process to ensure safe and appropriate use of the medication and optimization of its risk-benefit profile. Elements of the belatacept REMS include a medication guide that must be dispensed with each infusion and a communication plan. In the management of a complex population of patients, it is essential that those who care for transplant recipients, and patients, recognize the implications of potential and known risks of belatacept. The REMS program aims to facilitate careful selection and education of patients and vigilant monitoring.

  20. Credit risk evaluation based on social media.

    Science.gov (United States)

    Yang, Yang; Gu, Jing; Zhou, Zongfang

    2016-07-01

    Social media has been playing an increasingly important role in the sharing of individuals' opinions on many financial issues, including credit risk in investment decisions. This paper analyzes whether these opinions, which are transmitted through social media, can accurately predict enterprises' future credit risk. We consider financial statements oriented evaluation results based on logit and probit approaches as the benchmarks. We then conduct textual analysis to retrieve both posts and their corresponding commentaries published on two of the most popular social media platforms for financial investors in China. Professional advice from financial analysts is also investigated in this paper. We surprisingly find that the opinions extracted from both posts and commentaries surpass opinions of analysts in terms of credit risk prediction. Copyright © 2015 Elsevier Inc. All rights reserved.

  1. A quantitative evaluation of a qualitative risk assessment framework: Examining the assumptions and predictions of the Productivity Susceptibility Analysis (PSA)

    Science.gov (United States)

    2018-01-01

    Qualitative risk assessment frameworks, such as the Productivity Susceptibility Analysis (PSA), have been developed to rapidly evaluate the risks of fishing to marine populations and prioritize management and research among species. Despite being applied to over 1,000 fish populations, and an ongoing debate about the most appropriate method to convert biological and fishery characteristics into an overall measure of risk, the assumptions and predictive capacity of these approaches have not been evaluated. Several interpretations of the PSA were mapped to a conventional age-structured fisheries dynamics model to evaluate the performance of the approach under a range of assumptions regarding exploitation rates and measures of biological risk. The results demonstrate that the underlying assumptions of these qualitative risk-based approaches are inappropriate, and the expected performance is poor for a wide range of conditions. The information required to score a fishery using a PSA-type approach is comparable to that required to populate an operating model and evaluating the population dynamics within a simulation framework. In addition to providing a more credible characterization of complex system dynamics, the operating model approach is transparent, reproducible and can evaluate alternative management strategies over a range of plausible hypotheses for the system. PMID:29856869

  2. Evaluation Methods for Prevention Education.

    Science.gov (United States)

    Blue, Amy V.; Barnette, J. Jackson; Ferguson, Kristi J.; Garr, David R.

    2000-01-01

    Discusses the importance of assessing medical students' competence in prevention knowledge, skills, and attitudes. Provides general guidance for programs interested in evaluating their prevention instructional efforts, and gives specific examples of possible methods for evaluating prevention education. Stresses the need to tailor assessment…

  3. Risk informed inservice inspection evaluation of the ComEd nuclear plants

    International Nuclear Information System (INIS)

    Fleming, K.N.; Hutchinson, J.J.

    2000-01-01

    In November, 1999 Commonwealth Edison Company began the largest scope project yet performed to implement risk informed in-service inspection programs for piping systems. A contractor team led by ERIN Engineering and Research was selected to perform full scope risk informed evaluations on ten reactor units at five sites including 3 BWR and 2 PWR stations. This risk informed evaluation has applied a number of advancements to RISI technology in key areas including risk quantification of inspection program changes, element selection, treatment of multiple damage mechanisms at a given location, and in streamlining an approach to RISI initially developed by EPRI. The scope of the evaluation covered more than 18,000 ASME Class 1 and 2 welds not counting those that will continue to be inspected as part of augmented programs for flow accelerated corrosion, stress corrosion cracking, and service water systems. When the current ASME Section XI based exams are replaced by the risk informed program, while some new inspection locations will be added, substantial cost savings and person-rem exposures are projected from the elimination of most of the current exams. ComEd expects to recover its investment in the RISI evaluation for each of the 10 reactor units in 1 to 2 refueling outages, from the cost savings of reduced inspections. At the same time, the risk of a severe accident due to pipe ruptures is not expected to exhibit significant changes. (author)

  4. Development of evaluation method for software safety analysis techniques

    International Nuclear Information System (INIS)

    Huang, H.; Tu, W.; Shih, C.; Chen, C.; Yang, W.; Yih, S.; Kuo, C.; Chen, M.

    2006-01-01

    Full text: Full text: Following the massive adoption of digital Instrumentation and Control (I and C) system for nuclear power plant (NPP), various Software Safety Analysis (SSA) techniques are used to evaluate the NPP safety for adopting appropriate digital I and C system, and then to reduce risk to acceptable level. However, each technique has its specific advantage and disadvantage. If the two or more techniques can be complementarily incorporated, the SSA combination would be more acceptable. As a result, if proper evaluation criteria are available, the analyst can then choose appropriate technique combination to perform analysis on the basis of resources. This research evaluated the applicable software safety analysis techniques nowadays, such as, Preliminary Hazard Analysis (PHA), Failure Modes and Effects Analysis (FMEA), Fault Tree Analysis (FTA), Markov chain modeling, Dynamic Flowgraph Methodology (DFM), and simulation-based model analysis; and then determined indexes in view of their characteristics, which include dynamic capability, completeness, achievability, detail, signal/ noise ratio, complexity, and implementation cost. These indexes may help the decision makers and the software safety analysts to choose the best SSA combination arrange their own software safety plan. By this proposed method, the analysts can evaluate various SSA combinations for specific purpose. According to the case study results, the traditional PHA + FMEA + FTA (with failure rate) + Markov chain modeling (without transfer rate) combination is not competitive due to the dilemma for obtaining acceptable software failure rates. However, the systematic architecture of FTA and Markov chain modeling is still valuable for realizing the software fault structure. The system centric techniques, such as DFM and Simulation-based model analysis, show the advantage on dynamic capability, achievability, detail, signal/noise ratio. However, their disadvantage are the completeness complexity

  5. [Legal and methodical aspects of occupational risk management].

    Science.gov (United States)

    2011-01-01

    Legal and methodical aspects of occupational risk management (ORM) are considered with account of new official documents. Introduction of risk and risk management notions into Labor Code reflects the change of forms of occupational health and safety. The role of hygienist and occupational medicine professionals in workplace conditions certification (WCC) and periodical medical examinations (PME) is strengthened. The ORM could be improved by introducing the block of prognosis and causation based on IT-technologies that could match systems of WCC and PME thus improving the effectiveness of prophylactics.

  6. Risk assessment methods for life cycle costing in buildings

    Directory of Open Access Journals (Sweden)

    Oduyemi Olufolahan

    2016-01-01

    Originality/value. This paper contributes with new outlooks aimed at assessing the current level of awareness, usage and advocated benefits of risk assessment methods in LCC and adds to the limited empirical studies on risk assessment to corporate occupants and decision makers.

  7. The evaluation of endodontic flare-ups and their relationship to various risk factors

    OpenAIRE

    Onay, Emel Olga; Ungor, Mete; Yazici, A. Canan

    2015-01-01

    Background To evaluate the incidence of flare-ups and identify the risk factors including age, gender, tooth type, number of root canals, initial diagnosis, the type of irrigation regimen, treatment modality and the number of visits, in patients who received root canal treatment from January 2002 to January 2008. Methods Records of 1819 teeth belonging to 1410 patients treated by 1 endodontics specialist during 6-year period were kept. Patient, tooth, and treatment characteristics were evalua...

  8. Evaluation of bullying in persons with different risk for psychosis

    Directory of Open Access Journals (Sweden)

    Vasić Jelena

    2015-01-01

    Full Text Available Introduction: Emerging research suggests that being exposed to bullying during childhood can increase the risk of psychotic experiences in adulthood. Aggressive peer relations among adolescents are more frequent in boys, both for being victims or perpetrators. Aim: To evaluate whether bullying was more prevalent among Serbian clinical population of patients with psychosis in comparison to their healthy siblings and controls, and to analyze gender differences regarding bullying. Material and methods: This cross-sectional study evaluated schizophrenia spectrum patients (n = 52, age = 29.3 ± 5.9 yrs, in remission, illness duration <10 yrs, their healthy siblings (n = 55, age = 28.6 ± 6.8 yrs and controls (n=50, age=25.3±1.5 yrs. The subjects fulfilled the bullying questionnaire, five item self-rating scale. Descriptive statistics and Mann-Whitney nonparametric test were used to analyze the data. Results: Compared to their healthy siblings, the patients were more likely to report that they were bullied (patients: 7.0 ± 3.5, siblings: 5.2 ± 2.0, p = 0.000, but patients also bullied others more (patients: 1.4 ± 0.8, siblings: 1.1 ± 0.4, p = 0.02. Comparing the group of patients and controls, we did not find statistically significant difference in any category. The male gender brings higher risk of being physically bullied which has been proven for all examined groups (patients- p = 0.03, controls and siblings- p = 0.00. Conclusion: Aggressive peer relations possibly contribute to the evolution of psychosis, as they were more prevalent in patients in comparison to their healthy siblings, particularly in males. Improved prevention of bullying and use of treatments against its psychological consequences might be one of the possible methods to ameliorate the course of psychosis.

  9. Ergonomic lumbar risk analysis of construction workers by NIOSH method

    Directory of Open Access Journals (Sweden)

    Cinara Caetano Pereira

    2015-09-01

    Full Text Available Work in construction has tasks directly connected with manual transport. One of the body segments suffering greater demand in works with these characteristics is the lumbar spine segment. The aim of this study was to analyze the level of risk of lumbar construction workers in the shipment of materials. The sample was composed of 74 construction workers. Were used as a research tool: the NIOSH method for lumbar risk verification expressed by weight limit recommended (WPR and the lifting Index (IL, Visual analogue scale (VAS for the evaluation of pain intensity, the e-1 Corlett.0 for the mapping of the pain and Borg to the subjective perception of the intensity of physical exertion. The present study identified the weight limit (WP of 8.707 for management activity of bags of cement for the load of 8.194 wheelbarrows used. These findings are 6 times under actual weights handled during the activities that revolve around 50 kg with the sacks and averaged 49.72 kg stands with mass. The dimensional settings found in the search are at high risk for ergonomic lumbar region, and measures of reconfiguration of workplaces and operation of auxiliary devices for lifting, transporting and unloading are fundamental, in addition to the need for reflection about the current logistical problems that induce producers to supply the cement sacks with 50 kg.

  10. Risk evaluation and monitoring in multiple sclerosis therapeutics.

    Science.gov (United States)

    Clanet, Michel C; Wolinsky, Jerry S; Ashton, Raymond J; Hartung, Hans-Peter; Reingold, Stephen C

    2014-09-01

    Risk for multiple sclerosis (MS) disease-modifying therapies (DMT) must be assessed on an ongoing basis. Early concerns regarding the first-approved DMTs for MS have been mitigated, but recently licensed therapies have been linked to possibly greater risks. The objective of this review is to discuss risk assessment in MS therapeutics based on an international workshop and comprehensive literature search and recommend strategies for risk assessment/monitoring. Assessment and perception of therapeutic risks vary between patients, doctors and regulators. Acceptability of risk depends on the magnitude of risk and the demonstrated clinical benefits of any agent. Safety signals must be distinguishable from chance occurrences in a clinical trial and in long-term use of medications. Post-marketing research is crucial for assessing longer-term safety in large patient cohorts. Reporting of adverse events is becoming more proactive, allowing more rapid identification of risks. Communication about therapeutic risks and their relationship to clinical benefit must involve patients in shared decision making. It is difficult to produce a general risk-assessment algorithm for all MS therapies. Specific algorithms are required for each DMT in every treated-patient population. New and evolving risks must be evaluated and communicated rapidly to allow patients and physicians to be well informed and able to share treatment decisions. © The Author(s) 2013.

  11. A hybrid method for evaluating enterprise architecture implementation.

    Science.gov (United States)

    Nikpay, Fatemeh; Ahmad, Rodina; Yin Kia, Chiam

    2017-02-01

    Enterprise Architecture (EA) implementation evaluation provides a set of methods and practices for evaluating the EA implementation artefacts within an EA implementation project. There are insufficient practices in existing EA evaluation models in terms of considering all EA functions and processes, using structured methods in developing EA implementation, employing matured practices, and using appropriate metrics to achieve proper evaluation. The aim of this research is to develop a hybrid evaluation method that supports achieving the objectives of EA implementation. To attain this aim, the first step is to identify EA implementation evaluation practices. To this end, a Systematic Literature Review (SLR) was conducted. Second, the proposed hybrid method was developed based on the foundation and information extracted from the SLR, semi-structured interviews with EA practitioners, program theory evaluation and Information Systems (ISs) evaluation. Finally, the proposed method was validated by means of a case study and expert reviews. This research provides a suitable foundation for researchers who wish to extend and continue this research topic with further analysis and exploration, and for practitioners who would like to employ an effective and lightweight evaluation method for EA projects. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Evaluation of risk factors for degenerative joint disease associated with hip dysplasia in dogs

    International Nuclear Information System (INIS)

    Smith, G.K.; Popovitch, C.A.; Gregor, T.P.; Shofer, F.S.

    1995-01-01

    Passive coxofemoral joint laxity of dogs, as quantitated by a distraction-stress radiographic method, may have important prognostic value in determining susceptibility to hip dysplasia. Data from 151 dogs, representing 13 breeds, were included in a logistic regression model to evaluate the contribution of factors such as age, breed, weight, sex, distraction index, and Norberg angle to the risk of developing degenerative joint disease (DJD) of the coxofemoral joint. Of the factors studied, the amount of passive hip laxity, as quantitated by the distraction index, was the most significant (P < 0.0001) determinant of the risk to develop DJD of the coxofemoral joint. In the longitudinal and cross-sectional components of the study, distraction index was a significant (P < 0.001) risk factor for DJD, irrespective of age at evaluation (4, 12, or 24 months). The strength of the hip laxity:DJD correlation increased with the age of dog. In contrast, the Norberg angle, a measure of hip laxity on the standard hip-extended radiograph, was not found to be a significant risk factor for DJD, either in the longitudinal or cross-sectional analyses. Breed-specific probability curves of DJD susceptibility indicated that German Shepherd Dogs had a significantly (P < 0.05) greater risk of developing DJD than did the pool of non-German Shepherd Dogs. The information derived from this statistical model will help to scientifically characterize the role of passive hip laxity as a component in the pathogenesis of DJD of the coxofemoral joint

  13. Biochemical Benefits, Diagnosis, and Clinical Risks Evaluation of Kratom

    Directory of Open Access Journals (Sweden)

    Dimy Fluyau

    2017-04-01

    Full Text Available BackgroundKratom (Mitragyna speciosa is a tropical tree with a long history of traditional use in parts of Africa and Southeast Asia. Kratom is also known as Thom, Thang, and Biak. Its leaves and the teas brewed from them have long been used by people in that region to manage pain and opioid withdrawal and to stave off fatigue. Kratom is actually consumed throughout the world for its stimulant effects and as an opioid substitute (in form of tea, chewed, smoked, or ingested in capsules. Some case reports have associated kratom exposure with psychosis, seizures, intrahepatic cholestasis, other medical conditions, and deaths. The clinical manifestations of kratom effects are not well defined and the clinical studies are limited. Data research suggest that both stimulant and sedative dose-dependent effects do exist, in addition to antinociceptive, antidepressant activity, anxiolytic-like effects, and anorectic effects, but a growing concern for the drug’s effects and safety of use has resulted in national and international attention primarily due to an increase in hospital visits and deaths in several countries that are believed to have been caused by extracts of the plant. There is a dearth of double blind controlled studies. In this study, we aim to use existing literature to clarify both benefits and risks of kratom as well as its diagnosis evaluation as kratom misuse is an emerging trend in the Western world.MethodsLiterature review using databases such as Embase, Medline, PubMed, Cochrane Library, and Mendeley from 2007 to 2017 were evaluated by all authors to analyze current state on benefits, risks, and diagnosis evaluation of kratom (M. speciosa.ResultsData analysis suggested that kratom possesses some benefits such as stimulant and sedative effects as wells as antinociceptive effects. It seems to inhibit pro-inflammatory mediator release and vascular permeability and can enhance immunity. In addition, it may be an antidepressant and

  14. How to evaluate the risks of exceeding limits: geostatistical models and their application to air pollution

    International Nuclear Information System (INIS)

    Fouquet, Ch. de; Deraisme, J.; Bobbia, M.

    2007-01-01

    Geo-statistics is increasingly applied to the study of environmental risks in a variety of sectors, especially in the fields of soil decontamination and the evaluation of the risks due to air pollution. Geo-statistics offers a rigorous stochastic modeling approach that makes it possible to answer questions expressed in terms of uncertainty and risk. This article focusses on nonlinear geo-statistical methods, based on the Gaussian random function model, whose essential properties are summarised. We use two examples to characterize situations where direct and thus rapid methods provide appropriate solutions and cases that inevitably require more laborious simulation techniques. Exposure of the population of the Rouen metropolitan area to the risk of NO 2 pollution is assessed by simulations, but the surface area where the pollution exceeds the threshold limit can be easily estimated with nonlinear conditional expectation techniques. A second example is used to discuss the bias introduced by direct simulation, here of a percentile of daily SO 2 concentration for one year in the city of Le Havre; an operational solution is proposed. (authors)

  15. Identifying and evaluating E-procurement in supply chain risk by Fuzzy MADM

    Directory of Open Access Journals (Sweden)

    Mostafa Memarzade

    2012-08-01

    Full Text Available E-procurement risks has emerged as an important issue for researchers and practitioners because mitigating supply chain risk helps improve firms’ as well as supply chains’ performance. E-marketplaces have been steadily growing and there have been significant interest in e-business research. There are different risks and uncertainties involved with E-marketplaces, which jeopardizes the sector but we have had a large amount of hype and the business still continue to grow. The primary aim of this study is to identify E-procurement risks and evaluate them using a fuzzy AHP framework. We contribute E-procurement risk by identifying 13 critical criteria and determine four important ones including the extent of acceptable information, interrelationship risk, lack of honesty in relationships and product quality and safety for evaluating suppliers’ risk.

  16. State of risk assessment

    International Nuclear Information System (INIS)

    Conrad, J.

    1978-03-01

    In view of the growing importance assumed in recent years by scientific work on the calculation, quantification, evaluation and acceptance as well as behavior in the face of risks in general and more specifically, the risks of large industrial plants, the report attempts to provide a survey of the current situation, results and evaluation of this new branch of research, risk assessment. The emphasis of the report is on the basic discussion and criticism of the theoretical and methodological approaches used in the field of risk assessment (section 3). It is concerned above all with - methodical problems of determining and quantifying risks (3.1) - questions of the possibility of risk evaluation and comp arison (3.1, 3.2) - the premises of normative and empirical studies on decision making under risk (3.2, 3.3) - investigations into society's acceptance of risks involved in the introduction of new technologies (3.4) - attempts to combine various aspects of the field of risk assessment in a unified concept (3.5, 3.6, 3.7). Because risk assessment is embedded in the framework of decision theory and technology assessment, it can be implicitly evaluated at a more general level within this framework, as far as its possibilities and weaknesses of method and application are concerned (section 4). Sections 2 and 5 deal with the social context of origin and utilization of risk assessment. Finally, an attempt is made at a summary indicating the possible future development of risk assessment. (orig./HP) [de

  17. Risk decisions and nuclear waste

    International Nuclear Information System (INIS)

    Hansson, S.O.

    1987-11-01

    The risk concept is multidimensional, and much of its contents is lost in the conventional reduction to a unidimensional and quantifiable term. Eight major dimensions of the risk concept are discussed, among them the time factor and the lack-of-knowledge factor. The requirements of a rational discourse are discussed, in general and in relation to risk issues. It is concluded that no single method for the comparison and assessment of risks can be seen as the only rational method. Different methods can all be rational, although based on different values. Risk evaluations cannot be performed as expert assessments, divorced from the political decision process. Instead, risk evaluation must be seen as an essentially political process. Public participation is necessary in democratic decision-making on risks as well as on other issues. Important conclusions can be drawn for the management of nuclear waste, concerning specifications for the technical solution, the need for research on risk concepts, and the decision-making process. (orig.)

  18. An operations-partnered evaluation of care redesign for high-risk patients in the Veterans Health Administration (VHA): Study protocol for the PACT Intensive Management (PIM) randomized quality improvement evaluation.

    Science.gov (United States)

    Chang, Evelyn T; Zulman, Donna M; Asch, Steven M; Stockdale, Susan E; Yoon, Jean; Ong, Michael K; Lee, Martin; Simon, Alissa; Atkins, David; Schectman, Gordon; Kirsh, Susan R; Rubenstein, Lisa V

    2018-06-01

    Patient-centered medical homes have made great strides providing comprehensive care for patients with chronic conditions, but may not provide sufficient support for patients at highest risk for acute care use. To address this, the Veterans Health Administration (VHA) initiated a five-site demonstration project to evaluate the effectiveness of augmenting the VA's Patient Aligned Care Team (PACT) medical home with PACT Intensive Management (PIM) teams for Veterans at highest risk for hospitalization. Researchers partnered with VHA leadership to design a mixed-methods prospective multi-site evaluation that met leadership's desire for a rigorous evaluation conducted as quality improvement rather than research. We conducted a randomized QI evaluation and assigned high-risk patients to participate in PIM and compared them with high-risk Veterans receiving usual care through PACT. The summative evaluation examines whether PIM: 1) decreases VHA emergency department and hospital use; 2) increases satisfaction with VHA care; 3) decreases provider burnout; and 4) generates positive returns on investment. The formative evaluation aims to support improved care for high-risk patients at demonstration sites and to inform future initiatives for high-risk patients. The evaluation was reviewed by representatives from the VHA Office of Research and Development and the Office of Research Oversight and met criteria for quality improvement. VHA aims to function as a learning organization by rapidly implementing and rigorously testing QI innovations prior to final program or policy development. We observed challenges and opportunities in designing an evaluation consistent with QI standards and operations priorities, while also maintaining scientific rigor. This trial was retrospectively registered at ClinicalTrials.gov on April 3, 2017: NCT03100526. Protocol v1, FY14-17. Copyright © 2018 Elsevier Inc. All rights reserved.

  19. Effects of auditing patient safety in hospital care: design of a mixed-method evaluation

    Science.gov (United States)

    2013-01-01

    Background Auditing of patient safety aims at early detection of risks of adverse events and is intended to encourage the continuous improvement of patient safety. The auditing should be an independent, objective assurance and consulting system. Auditing helps an organisation accomplish its objectives by bringing a systematic, disciplined approach to evaluating and improving the effectiveness of risk management, control, and governance. Audits are broadly conducted in hospitals, but little is known about their effects on the behaviour of healthcare professionals and patient safety outcomes. This study was initiated to evaluate the effects of patient safety auditing in hospital care and to explore the processes and mechanisms underlying these effects. Methods and design Our study aims to evaluate an audit system to monitor and improve patient safety in a hospital setting. We are using a mixed-method evaluation with a before-and-after study design in eight departments of one university hospital in the period October 2011–July 2014. We measure several outcomes 3 months before the audit and 15 months after the audit. The primary outcomes are adverse events and complications. The secondary outcomes are experiences of patients, the standardised mortality ratio, prolonged hospital stay, patient safety culture, and team climate. We use medical record reviews, questionnaires, hospital administrative data, and observations to assess the outcomes. A process evaluation will be used to find out which components of internal auditing determine the effects. Discussion We report a study protocol of an effect and process evaluation to determine whether auditing improves patient safety in hospital care. Because auditing is a complex intervention targeted on several levels, we are using a combination of methods to collect qualitative and quantitative data about patient safety at the patient, professional, and department levels. This study is relevant for hospitals that want to

  20. Development of a Preliminary Model for Evaluating Occupational Health and Safety Risk Management Maturity in Small and Medium-Sized Enterprises

    Directory of Open Access Journals (Sweden)

    Bilal Kaassis

    2018-02-01

    Full Text Available Management of occupational health and safety (OHS risks is a crucial component of any business. Numerous investigations have shown that work-related injuries and deaths occur disproportionately in small-to-medium-sized enterprises (SMEs and that this is clearly due to deficient management of OHS risks. The main goal of this work is to develop a base of indicators suitable for evaluating OHS risk management maturity in industrial SMEs. A preliminary model is then proposed for this evaluation, based on a small number of relevant indicators selected from a careful bibliographic review. The work begins with a critical review of the literature and analysis of known concepts, methods, tools and models of measurement of risk analysis maturity in order to extract relevant indicators. The most suitable indicators are then grouped to form the basis of a preliminary model for evaluating OHS risk management maturity in the SME setting. Our findings will help managers of SMEs make sound decisions in their quest to improve the OHS performance of their businesses.

  1. Fire risk assessment method under the technical building code; Metodo de evaluacion del reisgo de incendio en el marco del Codigo Tecnico de la Edificacion

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Martin, J. C.; Diaz-Diaz, R.; Santos-Garcia, R.

    2010-07-01

    The high complexity of measuring and comparing the risk level of performance based design allowed by the Spain Building Code (CTE) and the lack of Spanish legislation on the matter makes a fire risk evaluation tool highly useful guiding the project's and the control authority over the feasibility of these complicated projects. A fire Risk Evaluation Method within the frame of the Spanish Building Code (MEREDICTE) has been developed trying to balance input sources, simplicity and clearness in its use. The number of parameters implied guarantees sound, exhaustive and reliable outputs. MEREDICTE is made of 73 parameters: 31 calculate potential risk and 42 obtain protection level. In an orientative way, MEREDICTE's parameters triple those of the most referred and extended evaluation method: the Gretener Method. The article shows the MEREDICTE technique and foundations, the methodology used in its investigation and development, its most significant innovation and its possible applications. Regarding the protection level, its formulation and applications re referred to the Windsor buildings of Madrid comparing the results obtained on the building as it was devastated by the fire of February 2005 and whether it fulfilled the Spanish building code conditions. (Author) 8 refs.

  2. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    Science.gov (United States)

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  3. Research into real-option evaluation method

    International Nuclear Information System (INIS)

    Shiba, Tsuyoshi; Wakamatsu, Hitoshi

    2002-03-01

    As an evaluational method for valuation of a corporation, an investment project, a research and development, or the evaluation technique of an enterprise strategy, a real option analysis attracts attention instead of conventional Discount Cash Flow method. The reason is that it can divert the technique for the option valuation in financial engineering to the decision-making process performed according to change in investment environment. Related references, the analysis tools, the application examples, etc. were investigated about the decision-making technique using real option analysis, and this investigation considered the application method to decision-making of the research and development at Japan Nuclear Cycle Development Institute. Consequently, since the feature is in real option analysis being the evaluation technique on condition of that business conditions and business itself also change, the real option analysis fits for evaluation of a research and development that business conditions were opaque and it turns out that the businesses are highly flexible. Moreover, it turns out that it fits also for evaluation of a capital concentration type investment issue like power plants. (author)

  4. Evaluation of activities aimed at preventing microbiological risks in dental practice

    Directory of Open Access Journals (Sweden)

    Jolanta Szymańska

    2013-02-01

    Full Text Available Background: Microbiological contamination of water in dental unit waterlines (DUWL creates a risk of cross-infections, and is a source of biological risk factors in the work environment of a dentist. The aim of the study was to evaluate dentists' knowledge on DUWL microbiological contamination and the scope of activities/procedures they undertake to monitor it. Material and Methods: The questionnaire survey was conducted in 2010 among 107 Polish dentists using dental units in everyday clinical practice. Results: It has been found that in their daily practice, dentists do not follow procedures leading to reduction or elimination of microbiological contamination of dental unit reservoir water. They are not aware of microbiological contamination of DUWL that supply working handpieces with water. They are unaware of the principles of dealing with dental water and water supply systems or the health risk posed by microbiological contamination of unit water for a dental team and patients. Conclusions: It is necessary to provide dentists with information on microbiological contamination of water in dental units, on the correct procedures of handling water and waterlines that supply working handpieces with water. Med Pr 2013;64(1:11–17

  5. Evaluation of the risk associated with the storage of radioactive wastes. The deterministic approach

    International Nuclear Information System (INIS)

    Lewi, J.

    1988-07-01

    Radioactive waste storage facility safety depends on a certain number of barriers being placed between the waste and man. These barriers, certain of which are articial (the waste package and engineered barriers) and others are natural (geological formations), are of characteristics suited to the type of storage facility (surface storage or storage in deep geological formations). The combination of these different barriers provide protection for man, under all circumstances considered plausible. Justification, for the storage of given quantities of radionuclides, of the choice of the site, the artificial barriers and the overall storage architecture, is obtained by evaluation of the risk. It being this which provides a basis for determining the acceptability of the storage facility. One of the following two methods is normally used for evaluation of the risk: the deterministic method and the probabilistic method. This adress describes the deterministic method. This method is employed in France for the safety analysis of the projects and works of ANDRA, the national agency responsible for the management of radioactive waste. It should be remembered that in France, the La Manche surface storage centre for low and medium activity waste has been in existence since 1969, close to the reprocessing plant at La Hague and a second surface storage centre is to be commissioned around 1991 at Soulaines in centre of France (departement de l'Aube). Furthermore, geological surveying of four sites located in geological formations consisting of granite, schist, clay and salt were begun in 1987 for the selection in about three years time of a site for the creation of an underground laboratory. This could later be transformed, if safety is demonstrated, into a deep storage centre

  6. Report on evaluation on endocrine disturbing effect of chemicals and development of test methods; 1999 nendo kagaku busshitsu no naibunpi kakuran koka ni kansuru hyoka oyobi shikenho no kaihatsu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With regard to endocrine disturbing effect being the new deleteriousness of chemicals, data were collected and evaluated by using the existing testing methods, data were collected by using the screening test, the testing methods were developed, and international investigation was carried out to establish the risk evaluation methods. In the evaluation by using the existing test methods, seven substance groups deficient in deleteriousness data qualitatively and quantitatively were given reproduction toxicity tests to evaluate availability of the endocrine activity. Development of the screening test method has been carried out by participating the validation test by OECD to make the uterotrophic assay method and the Hershberger assay method a test guideline having international matching property. International investigations to establish the risk evaluation were executed on the molecular mechanism of nuclear receptors, the chemical, metabolic and environmental behaviors of endocrine active substances, the effects of the endocrine active substances on experimental animals and human, the utilization thereof for risk assessment in human, and the effects of endocrine disturbance acting substances in wildlife species. (NEDO)

  7. Evaluation of local corrosion life by statistical method

    International Nuclear Information System (INIS)

    Kato, Shunji; Kurosawa, Tatsuo; Takaku, Hiroshi; Kusanagi, Hideo; Hirano, Hideo; Kimura, Hideo; Hide, Koichiro; Kawasaki, Masayuki

    1987-01-01

    In this paper, for the purpose of achievement of life extension of light water reactor, we examined the evaluation of local corrosion by satistical method and its application of nuclear power plant components. There are many evaluation examples of maximum cracking depth of local corrosion by dowbly exponential distribution. This evaluation method has been established. But, it has not been established that we evaluate service lifes of construction materials by satistical method. In order to establish of service life evaluation by satistical method, we must strive to collect local corrosion dates and its analytical researchs. (author)

  8. Risk evaluation and control strategies for indoor radon: a brief discussion

    International Nuclear Information System (INIS)

    Nero, A.V. Jr.

    1994-01-01

    Average risks of death estimated for radon are larger than those for many exposures in the outdoor environment, but similar to some in industrial settings. However, the indoor environment differs in regard to cost, benefit, responsibility, and distribution of risks from the outdoor and occupational settings, where frameworks for setting risk-limiting objectives and strategies have already been developed substantially. This indicates the need to develop a conceptual framework for evaluating risks in the indoor environment, within which the objectives of radon control strategies can be sensibly chosen. Nevertheless, the range of estimated radon risks and of recent radon control strategies suggest near-term elements of any strategy, i.e. accurate and effective public information, as well as reliable monitoring and control capabilities, and a focus on areas where most high residential levels occur. Developing a conceptual framework for evaluating indoor risks will permit the formulation of suitable aims on average indoor exposures and lower exposure situations. (author)

  9. Research on Risk Evaluation of Transnational Power Networking Projects Based on the Matter-Element Extension Theory and Granular Computing

    Directory of Open Access Journals (Sweden)

    Jinying Li

    2017-10-01

    Full Text Available In project management, risk assessment is crucial for stakeholders to identify the risk factors during the whole life cycle of the project. A risk evaluation index system of a transnational networking project, which provides an effective way for the grid integration of clean electricity and the sustainable development of the power industry, is constructed in this paper. Meanwhile, a combination of granular computing and order relation analysis (G1 method is applied to determine the weight of each indicator and the matter-element extension evaluation model is also employed to seek the global optimal decision during the risk assessment. Finally, a case study is given to validate the index system and evaluation model established in this paper by assessing two different investment schemes of a transnational high voltage direct current (HVDC transmission project. The result shows that the comprehensive risk level of Scheme 1 is “Low” and the level of Scheme 2 is “General”, which means Scheme 1 is better for the stakeholders from the angle of risk control. The main practical significance of this paper lies in that it can provide a reference and decision support for the government’s power sectors, investment companies and other stakeholders when carrying out related activities.

  10. Pharmaceutical supply chain risk assessment in Iran using analytic hierarchy process (AHP) and simple additive weighting (SAW) methods.

    Science.gov (United States)

    Jaberidoost, Mona; Olfat, Laya; Hosseini, Alireza; Kebriaeezadeh, Abbas; Abdollahi, Mohammad; Alaeddini, Mahdi; Dinarvand, Rassoul

    2015-01-01

    Pharmaceutical supply chain is a significant component of the health system in supplying medicines, particularly in countries where main drugs are provided by local pharmaceutical companies. No previous studies exist assessing risks and disruptions in pharmaceutical companies while assessing the pharmaceutical supply chain. Any risks affecting the pharmaceutical companies could disrupt supply medicines and health system efficiency. The goal of this study was the risk assessment in pharmaceutical industry in Iran considering process's priority, hazard and probability of risks. The study was carried out in 4 phases; risk identification through literature review, risk identification in Iranian pharmaceutical companies through interview with experts, risk analysis through a questionnaire and consultation with experts using group analytic hierarchy process (AHP) method and rating scale (RS) and risk evaluation of simple additive weighting (SAW) method. In total, 86 main risks were identified in the pharmaceutical supply chain with perspective of pharmaceutical companies classified in 11 classes. The majority of risks described in this study were related to the financial and economic category. Also financial management was found to be the most important factor for consideration. Although pharmaceutical industry and supply chain were affected by current political conditions in Iran during the study time, but half of total risks in the pharmaceutical supply chain were found to be internal risks which could be fixed by companies, internally. Likewise, political status and related risks forced companies to focus more on financial and supply management resulting in less attention to quality management.

  11. A new method used to evaluate organic working fluids

    International Nuclear Information System (INIS)

    Zhang, Xinxin; He, Maogang; Wang, Jingfu

    2014-01-01

    In this paper, we propose a method named “Weight Classification-Hasse Dominance” to evaluate organic working fluids. This new method combines the advantages of both the method of weight determination and the Hasse Diagram Technique (HDT). It can be used to evaluate the thermodynamic performance, environmental protection indicator, and safety requirement of organic working fluid simultaneously. This evaluation method can offer good reference for working fluid selection. Using this method, the organic working fluids which have been phased out and will be phased out by the Montreal Protocol including CFCs (chlorofluorocarbons), HCFCs (hydrochlorofluorocarbons), and HFCs (hydrofluorocarbons) were evaluated. Moreover, HCs (hydrocarbons) can be considered as a completely different kind of organic working fluid from CFCs, HCFCs, and HFCs according to the comparison based on this new evaluation method. - Highlights: • We propose a new method used to evaluate organic working fluids. • This evaluation method can offer good reference for working fluid selection. • CFC, HCFC, and HFC working fluids were evaluated using this evaluation method. • HC can be considered as a totally different working fluid from CFC, HCFC, and HFC

  12. Computational methods for data evaluation and assimilation

    CERN Document Server

    Cacuci, Dan Gabriel

    2013-01-01

    Data evaluation and data combination require the use of a wide range of probability theory concepts and tools, from deductive statistics mainly concerning frequencies and sample tallies to inductive inference for assimilating non-frequency data and a priori knowledge. Computational Methods for Data Evaluation and Assimilation presents interdisciplinary methods for integrating experimental and computational information. This self-contained book shows how the methods can be applied in many scientific and engineering areas. After presenting the fundamentals underlying the evaluation of experiment

  13. Evaluation methods on the nutritional status of stroke patients.

    Science.gov (United States)

    Wang, J; Luo, B; Xie, Y; Hu, H-Y; Feng, L; Li, Z-N

    2014-01-01

    This study was designed to assess the effect of particular tools on the nutritional status of patients with stroke risk factors; to analyze these risk factors; to construct an assessment table; and to enable nurses to conduct fast and accurate assessment of the nutritional status of patients with stroke. Various nutritional assessment tools were employed to assess the nutritional status of stroke patients [(Nutritional Risk Screening 2002, NRS2002); (mini nutritional assessment, MNA), (subjective global assessment SGA), (malnutrition universal screening, MUST); (body composition, BCA)]. The leading disease-related factors of cerebral apoplexy were observed in patients with malnutrition. And a statistical analysis was conducted. The significant risk factors of cerebral apoplexy in malnourished patients older than 70 years were swallowing dysfunctions, disturbance of consciousness and reliance or half-reliance on feeding practices. The significant risk factors of malnutrition in patients with cerebral apoplexy were the decline in upper limb muscle strength, decline in the performance of various activities, loss of appetite and gastrointestinal symptoms. Disorders that affect the nutritional status of stroke patients can be used as evaluation tools, as described in the evaluation table. The clinical relevance of this study includes the following: to enable the clinical nursing staff to easily assess the patient's nutritional status in a timely manner; to improve compliance with nutritional evaluation; to provide clinical nutrition support to patients with stroke; and to provide a scientific basis for the improvement of the clinical outcomes of patients with cerebral apoplexy.

  14. A method for scenario-based risk assessment for robust aerospace systems

    Science.gov (United States)

    Thomas, Victoria Katherine

    In years past, aircraft conceptual design centered around creating a feasible aircraft that could be built and could fly the required missions. More recently, aircraft viability entered into conceptual design, allowing that the product's potential to be profitable should also be examined early in the design process. While examining an aerospace system's feasibility and viability early in the design process is extremely important, it is also important to examine system risk. In traditional aerospace systems risk analysis, risk is examined from the perspective of performance, schedule, and cost. Recently, safety and reliability analysis have been brought forward in the design process to also be examined during late conceptual and early preliminary design. While these analyses work as designed, existing risk analysis methods and techniques are not designed to examine an aerospace system's external operating environment and the risks present there. A new method has been developed here to examine, during the early part of concept design, the risk associated with not meeting assumptions about the system's external operating environment. The risks are examined in five categories: employment, culture, government and politics, economics, and technology. The risks are examined over a long time-period, up to the system's entire life cycle. The method consists of eight steps over three focus areas. The first focus area is Problem Setup. During problem setup, the problem is defined and understood to the best of the decision maker's ability. There are four steps in this area, in the following order: Establish the Need, Scenario Development, Identify Solution Alternatives, and Uncertainty and Risk Identification. There is significant iteration between steps two through four. Focus area two is Modeling and Simulation. In this area the solution alternatives and risks are modeled, and a numerical value for risk is calculated. A risk mitigation model is also created. The four steps

  15. Risk and risk acceptance by society

    International Nuclear Information System (INIS)

    Statt, C.

    1977-01-01

    Various dimensions of risk are identified which relate to the manner in which risk is perceived and evaluated, and several self-consistent risk characteristics are explored. Factors which are thought to influence the perception of risk include the degree of personal control over the risk, the potential of episodic events, and the probable severity of injury if a risk event occurs. Risk-benefit analysis can be applied to three problems: the allocation of resources for safety expenditures, the setting of standards, and societal risk taking decisions. Calculations of benefit are needed for the third area of application, methods for the other two frequently do not require such a measure. (orig./RW) [de

  16. A regional-scale ecological risk framework for environmental flow evaluations

    Science.gov (United States)

    O'Brien, Gordon C.; Dickens, Chris; Hines, Eleanor; Wepener, Victor; Stassen, Retha; Quayle, Leo; Fouchy, Kelly; MacKenzie, James; Graham, P. Mark; Landis, Wayne G.

    2018-02-01

    Environmental flow (E-flow) frameworks advocate holistic, regional-scale, probabilistic E-flow assessments that consider flow and non-flow drivers of change in a socio-ecological context as best practice. Regional-scale ecological risk assessments of multiple stressors to social and ecological endpoints, which address ecosystem dynamism, have been undertaken internationally at different spatial scales using the relative-risk model since the mid-1990s. With the recent incorporation of Bayesian belief networks into the relative-risk model, a robust regional-scale ecological risk assessment approach is available that can contribute to achieving the best practice recommendations of E-flow frameworks. PROBFLO is a holistic E-flow assessment method that incorporates the relative-risk model and Bayesian belief networks (BN-RRM) into a transparent probabilistic modelling tool that addresses uncertainty explicitly. PROBFLO has been developed to evaluate the socio-ecological consequences of historical, current and future water resource use scenarios and generate E-flow requirements on regional spatial scales. The approach has been implemented in two regional-scale case studies in Africa where its flexibility and functionality has been demonstrated. In both case studies the evidence-based outcomes facilitated informed environmental management decision making, with trade-off considerations in the context of social and ecological aspirations. This paper presents the PROBFLO approach as applied to the Senqu River catchment in Lesotho and further developments and application in the Mara River catchment in Kenya and Tanzania. The 10 BN-RRM procedural steps incorporated in PROBFLO are demonstrated with examples from both case studies. PROBFLO can contribute to the adaptive management of water resources and contribute to the allocation of resources for sustainable use of resources and address protection requirements.

  17. A Method for Accounting for Risk in Lending

    National Research Council Canada - National Science Library

    Kobylski, Gerald

    1997-01-01

    ..., or decreased to increase competitiveness? Many lending institutions, specifically furniture retailers, do not use scientific methods for determining their risk of payment defaults on loans to customers...

  18. Critical infrastructure cyber-security risk management

    OpenAIRE

    Spyridopoulos, T.; Maraslis, K.; Tryfonas, T.; Oikonomou, G.

    2017-01-01

    Traditional IT cyber-security risk management methods are based on the evaluation of risks calculated as the likelihood of cyber-security incidents occurring. However, these probabilities are usually estimations or guesses based on past experience and incomplete data. Incorrect estimations can lead to errors in the evaluation of risks that can ultimately affect the protection of the system. This issue is also transferred to methods used in Industrial Control Systems (ICSs), as they are mainly...

  19. Mammary radiotherapy and patients-risks management with continue evaluation of clinical indicators

    International Nuclear Information System (INIS)

    Untereiner, M.; Frederick, B.; Burie, D.; Cavuto, C.; Rob, L.; Coiffier, N.; Colet, M.

    2009-01-01

    Purpose: The breast irradiation represents 25% of radiotherapy indication in the radiotherapy centers. The modeling of the management of complications risks and recurrences in relation with mammary irradiation constitutes a methodological base allowing to develop a general concept for any other indication of radiotherapy. The objective of the study was a continuous evaluation of clinical risks to get indicators of the therapy results: for the institution, to get an auto-evaluation tool of the functioning (continuous evaluation of clinical results, identification of sentinel events); for the patients to get precise and detailed information on the risks linked to their treatment (communication of clinical results, comparison with the literature, benchmarking). (N.C.)

  20. Risk evaluation and mitigation strategies: a focus on the mycophenolic acid preparations.

    Science.gov (United States)

    Rostas, Sara; Kim, Miae; Gabardi, Steven

    2014-03-01

    To review risks associated with mycophenolic acid (MPA) preparations and evaluate their required risk evaluation and mitigation strategies (REMS) elements. Articles were identified through a non-date-limited MEDLINE and EMBASE search using the terms fetal toxicity, teratogenicity, risk evaluation and mitigation strategies, REMS, MPA, mycophenolate mofetil, entericcoated MPA, and organ transplant. Information from the Food and Drug Administration (FDA) and the manufacturers of the MPA preparations was also evaluated. The MPA preparations are associated with several potential risks, including gastrointestinal disturbances and myelosuppression; however, their impact on the fetus in pregnant patients taking 1 of these agents poses the greatest risk. The FDA approved REMS programs for all MPA products, both innovator and generic preparations, in September 2012. With evidence of increased risk of miscarriage and birth defects associated with MPA use, the FDA instituted a REMS program that contains both a medication guide and elements to assure safe use (ETASU). The medication guides for the MPA products, which were previously FDA approved, should continue to be distributed to patients who get either an initial prescription filled or a refill. The ETASU requires prescribers to complete training and obtain patient signatures on the Patient-Prescriber Acknowledgment Form. A single, national, voluntary pregnancy registry specific to this medication has been established, and pregnant patients should be encouraged to participate. Although the impact of the MPA REMS on clinical practice is not clear, it is a step toward increasing the understanding of fetal risks with MPA.

  1. Spatial epidemiology of cancer: a review of data sources, methods and risk factors

    Directory of Open Access Journals (Sweden)

    Rita Roquette

    2017-05-01

    Full Text Available Cancer is a major concern among chronic diseases today. Spatial epidemiology plays a relevant role in this matter and we present here a review of this subject, including a discussion of the literature in terms of the level of geographic data aggregation, risk factors and methods used to analyse the spatial distribution of patterns and spatial clusters. For this purpose, we performed a websearch in the Pubmed and Web of Science databases including studies published between 1979 and 2015. We found 180 papers from 63 journals and noted that spatial epidemiology of cancer has been addressed with more emphasis during the last decade with research based on data mostly extracted from cancer registries and official mortality statistics. In general, the research questions present in the reviewed papers can be classified into three different sets: i analysis of spatial distribution of cancer and/or its temporal evolution; ii risk factors; iii development of data analysis methods and/or evaluation of results obtained from application of existing methods. This review is expected to help promote research in this area through the identification of relevant knowledge gaps. Cancer’s spatial epidemiology represents an important concern, mainly for public health policies design aimed to minimise the impact of chronic disease in specific populations.

  2. Decision Making and Risk Evaluation Frameworks for Extreme Space Weather Events

    Science.gov (United States)

    Uritskaya, O.; Robinson, R. M.; Pulkkinen, A. A.

    2017-12-01

    Extreme Space Weather events (ESWE) are in the spotlight nowadays because they can produce a significant impact not only due to their intensity and broad geographical scope, but also because of the widespread levels and the multiple sectors of the economy that could be involved. In the task of evaluation of the ESWE consequences, the most problematic and vulnerable aspect is the determination and calculation of the probability of statistically infrequent events and the subsequent assessment of the economic risks. In this work, we conduct a detailed analysis of the available frameworks of the general Decision-Making Theory in the presence of uncertainty, in the context of their applicability for the numerical estimation of the risks and losses associated with ESWE. The results of our study demonstrate that, unlike the Multiple-criteria decision analysis or Minimax approach to modeling of the possible scenarios for the ESWE effects, which prevail in the literature, the most suitable concept is the Games Against Nature (GAN). It enables an evaluation of every economically relevant aspect of space weather conditions and obtain more detailed results. Choosing the appropriate methods for solving GAN models, i.e. determining the most optimal strategy with a given level of uncertainty, requires estimating the conditional probabilities of Space Weather events for each outcome of possible scenarios of this natural disaster. Due to the specifics of complex natural and economic systems, with which we are dealing in this case, this problem remains unsolved, mainly because of inevitable loss of information at every stage of the decision-making process. The analysis is illustrated by deregulated electricity markets of the USA and Canada, whose power grid systems are known to be perceptive to ESWE. The GAN model is more appropriate in identifying potential risks in economic systems. The proposed approach, when applied to the existing database of Space Weather observations and

  3. Effects of auditing patient safety in hospital care: design of a mixed-method evaluation.

    Science.gov (United States)

    Hanskamp-Sebregts, Mirelle; Zegers, Marieke; Boeijen, Wilma; Westert, Gert P; van Gurp, Petra J; Wollersheim, Hub

    2013-06-22

    Auditing of patient safety aims at early detection of risks of adverse events and is intended to encourage the continuous improvement of patient safety. The auditing should be an independent, objective assurance and consulting system. Auditing helps an organisation accomplish its objectives by bringing a systematic, disciplined approach to evaluating and improving the effectiveness of risk management, control, and governance. Audits are broadly conducted in hospitals, but little is known about their effects on the behaviour of healthcare professionals and patient safety outcomes. This study was initiated to evaluate the effects of patient safety auditing in hospital care and to explore the processes and mechanisms underlying these effects. Our study aims to evaluate an audit system to monitor and improve patient safety in a hospital setting. We are using a mixed-method evaluation with a before-and-after study design in eight departments of one university hospital in the period October 2011-July 2014. We measure several outcomes 3 months before the audit and 15 months after the audit. The primary outcomes are adverse events and complications. The secondary outcomes are experiences of patients, the standardised mortality ratio, prolonged hospital stay, patient safety culture, and team climate. We use medical record reviews, questionnaires, hospital administrative data, and observations to assess the outcomes. A process evaluation will be used to find out which components of internal auditing determine the effects. We report a study protocol of an effect and process evaluation to determine whether auditing improves patient safety in hospital care. Because auditing is a complex intervention targeted on several levels, we are using a combination of methods to collect qualitative and quantitative data about patient safety at the patient, professional, and department levels. This study is relevant for hospitals that want to early detect unsafe care and improve patient

  4. A probabilistic method for species sensitivity distributions taking into account the inherent uncertainty and variability of effects to estimate environmental risk.

    Science.gov (United States)

    Gottschalk, Fadri; Nowack, Bernd

    2013-01-01

    This article presents a method of probabilistically computing species sensitivity distributions (SSD) that is well-suited to cope with distinct data scarcity and variability. First, a probability distribution that reflects the uncertainty and variability of sensitivity is modeled for each species considered. These single species sensitivity distributions are then combined to create an SSD for a particular ecosystem. A probabilistic estimation of the risk is carried out by combining the probability of critical environmental concentrations with the probability of organisms being impacted negatively by these concentrations. To evaluate the performance of the method, we developed SSD and risk calculations for the aquatic environment exposed to triclosan. The case studies showed that the probabilistic results reflect the empirical information well, and the method provides a valuable alternative or supplement to more traditional methods for calculating SSDs based on averaging raw data and/or on using theoretical distributional forms. A comparison and evaluation with single SSD values (5th-percentile [HC5]) revealed the robustness of the proposed method. Copyright © 2012 SETAC.

  5. Risk assessment and risk evaluation

    International Nuclear Information System (INIS)

    Niehaus, F.

    1978-01-01

    With the help of results of investigations and model calculations the risk of nuclear energy in routine operation is shown. In this context it is pointed out that the excellent operation results of reactors all over the world have led to the acceptability of risks from local loads no longer being in question. The attention of radiation protection is therefore focused on the emissions of long-living isotopes which collect in the atmosphere. With LWRs the risk of accidents is so minimal that statistical data is, and never will be available. One has to therefore fall back upon the so-called fault tree analyses. On the subject of risk evalution the author referred to a poll in Austria. From the result of this investigation one might conclude that nuclear energy serves as a crystallization point for a discussion of varying concepts for future development. More attention should be paid to this aspect from both sides, in order to objectify the further expansion of this source of energy. (orig./HP) [de

  6. Methods for cost-benefit-risk analysis of material-accounting upgrades

    International Nuclear Information System (INIS)

    Fishbone, L.G.; Gordon, D.M.; Higinbotham, W.; Keisch, B.

    1988-01-01

    The authors have developed a cost-benefit-risk methodology for evaluating material-accounting upgrades at key measurement points in nuclear facilities. The focus of this methodology is on nuclear-material measurements and their effects on inventory differences and shipper/receiver differences. The methodology has three main components: cost, benefits, and risk factors. The fundamental outcome of the methodology is therefore cost-benefit ratios characterizing the proposed upgrades, with the risk factors applied as necessary to the benefits. Examples illustrate the methodology's use

  7. Evaluation of wholesale electric power market rules and financial risk management by agent-based simulations

    Science.gov (United States)

    Yu, Nanpeng

    As U.S. regional electricity markets continue to refine their market structures, designs and rules of operation in various ways, two critical issues are emerging. First, although much experience has been gained and costly and valuable lessons have been learned, there is still a lack of a systematic platform for evaluation of the impact of a new market design from both engineering and economic points of view. Second, the transition from a monopoly paradigm characterized by a guaranteed rate of return to a competitive market created various unfamiliar financial risks for various market participants, especially for the Investor Owned Utilities (IOUs) and Independent Power Producers (IPPs). This dissertation uses agent-based simulation methods to tackle the market rules evaluation and financial risk management problems. The California energy crisis in 2000-01 showed what could happen to an electricity market if it did not go through a comprehensive and rigorous testing before its implementation. Due to the complexity of the market structure, strategic interaction between the participants, and the underlying physics, it is difficult to fully evaluate the implications of potential changes to market rules. This dissertation presents a flexible and integrative method to assess market designs through agent-based simulations. Realistic simulation scenarios on a 225-bus system are constructed for evaluation of the proposed PJM-like market power mitigation rules of the California electricity market. Simulation results show that in the absence of market power mitigation, generation company (GenCo) agents facilitated by Q-learning are able to exploit the market flaws and make significantly higher profits relative to the competitive benchmark. The incorporation of PJM-like local market power mitigation rules is shown to be effective in suppressing the exercise of market power. The importance of financial risk management is exemplified by the recent financial crisis. In this

  8. Applying Multi-Criteria Analysis Methods for Fire Risk Assessment

    Directory of Open Access Journals (Sweden)

    Pushkina Julia

    2015-11-01

    Full Text Available The aim of this paper is to prove the application of multi-criteria analysis methods for optimisation of fire risk identification and assessment process. The object of this research is fire risk and risk assessment. The subject of the research is studying the application of analytic hierarchy process for modelling and influence assessment of various fire risk factors. Results of research conducted by the authors can be used by insurance companies to perform the detailed assessment of fire risks on the object and to calculate a risk extra charge to an insurance premium; by the state supervisory institutions to determine the compliance of a condition of object with requirements of regulations; by real state owners and investors to carry out actions for decrease in degree of fire risks and minimisation of possible losses.

  9. A Method of Fire Scenarios Identification in a Consolidated Fire Risk Analysis

    International Nuclear Information System (INIS)

    Lim, Ho Gon; Han, Sang Hoon; Yang, Joon Eon

    2010-01-01

    Conventional fire PSA consider only two cases of fire scenarios, that is one for fire without propagation and the other for single propagation to neighboring compartment. Recently, a consolidated fire risk analysis using single fault tree (FT) was developed. However, the fire scenario identification in the new method is similar to conventional fire analysis method. The present study develops a new method of fire scenario identification in a consolidated fire risk analysis method. An equation for fire propagation is developed to identify fire scenario and a mapping method of fire scenarios into internal event risk model is discussed. Finally, an algorithm for automatic program is suggested

  10. PERFORMANCE EVALUATION OF TURKISH TYPE A MUTUAL FUNDS AND PENSION STOCK FUNDS BY USING TOPSIS METHOD

    Directory of Open Access Journals (Sweden)

    Nesrin ALPTEKIN

    2009-07-01

    Full Text Available In this paper, it is evaluated performance of Turkish Type A mutual funds and pension stock funds by using TOPSIS method which is a multicriteria decision making approach. Both of these funds compose of stocks in their portfolios, so it can be enabled to compare each other. Generally, mutual or pension funds are evaluated according to their risk and return. At this point, it is used traditional performance measurement techniques of funds like Sharpe ratio, Sortino ratio, Treynor index and Jensen’s alpha. TOPSIS method takes into consideration all of these fund performance measurement techniques and provides more reasonable performance measurement.

  11. Matching methods to produce maps for pest risk analysis to resources

    Directory of Open Access Journals (Sweden)

    Richard Baker

    2013-09-01

    Full Text Available Decision support systems (DSSs for pest risk mapping are invaluable for guiding pest risk analysts seeking to add maps to pest risk analyses (PRAs. Maps can help identify the area of potential establishment, the area at highest risk and the endangered area for alien plant pests. However, the production of detailed pest risk maps may require considerable time and resources and it is important to match the methods employed to the priority, time and detail required. In this paper, we apply PRATIQUE DSSs to Phytophthora austrocedrae, a pathogen of the Cupressaceae, Thaumetopoea pityocampa, the pine processionary moth, Drosophila suzukii, spotted wing Drosophila, and Thaumatotibia leucotreta, the false codling moth. We demonstrate that complex pest risk maps are not always a high priority and suggest that simple methods may be used to determine the geographic variation in relative risks posed by invasive alien species within an area of concern.

  12. Stochastic Drought Risk Analysis and Projection Methods For Thermoelectric Power Systems

    Science.gov (United States)

    Bekera, Behailu Belamo

    Combined effects of socio-economic, environmental, technological and political factors impact fresh cooling water availability, which is among the most important elements of thermoelectric power plant site selection and evaluation criteria. With increased variability and changes in hydrologic statistical stationarity, one concern is the increased occurrence of extreme drought events that may be attributable to climatic changes. As hydrological systems are altered, operators of thermoelectric power plants need to ensure a reliable supply of water for cooling and generation requirements. The effects of climate change are expected to influence hydrological systems at multiple scales, possibly leading to reduced efficiency of thermoelectric power plants. This study models and analyzes drought characteristics from a thermoelectric systems operational and regulation perspective. A systematic approach to characterize a stream environment in relation to extreme drought occurrence, duration and deficit-volume is proposed and demonstrated. More specifically, the objective of this research is to propose a stochastic water supply risk analysis and projection methods from thermoelectric power systems operation and management perspectives. The study defines thermoelectric drought as a shortage of cooling water due to stressed supply or beyond operable water temperature limits for an extended period of time requiring power plants to reduce production or completely shut down. It presents a thermoelectric drought risk characterization framework that considers heat content and water quantity facets of adequate water availability for uninterrupted operation of such plants and safety of its surroundings. In addition, it outlines mechanisms to identify rate of occurrences of the said droughts and stochastically quantify subsequent potential losses to the sector. This mechanism is enabled through a model based on compound Nonhomogeneous Poisson Process. This study also demonstrates how

  13. Review. Assessing uncertainty and risk in forest planning and decision support systems: review of classical methods and introduction of new approaches

    Directory of Open Access Journals (Sweden)

    M. Pasalodos-Tato

    2013-07-01

    Full Text Available Aim: Since forest planning is characterized by long time horizon and it typically involves large areas of land and numerous stakeholders, uncertainty and risk should play an important role when developing forest management plans. The aim of this study is to review different methods to deal with risk and uncertainty in forest planning, listing problems that forest managers may face during the preparation of management plans and trying to give recommendations in regard to the application of each method according to the problem case. The inclusion of risk and uncertainty in decision support systems is also analyzed.Area: It covers the temporal and spatial scale of forest planning, the spatial context, the participation process, the objectives dimensions and the good and services addressed.Material and methods: Several hundreds of articles dealing with uncertainty and risk were identified regarding different forestry-related topics and approaches. Form them, around 170 articles were further reviewed, categorized and evaluated.Main results: The study presents a thorough review and classification of methods and approaches to consider risk and uncertainty in forest planning. Moreover, new approaches are introduced, showing the opportunities that their application present in forest planning.Research highlights: The study can aid forest managers in the decision making process when designing a forest management plan considering risk and uncertainty.Keywords: operations research; optimal alternative; stochastic risk; endogenous risk; stand level; forest level.

  14. Seismic risk evaluation within the technology neutral framework

    International Nuclear Information System (INIS)

    Johnson, B.C.; Apostolakis, G.E.

    2012-01-01

    Highlights: ► We examine seismic risk within the Technology Neutral Framework (TNF). ► We find that the risk goals in the TNF to be stringent compared with current goals. ► We note that the current fleet reactors would not meet the TNF goals. ► We recommend that an initiating frequency cutoff of 10 −5 per year be use in evaluating seismic risk. - Abstract: The NRC Office of Nuclear Regulatory Research has proposed a risk-informed and performance-based licensing process that is referred to as the technology neutral framework (TNF). In the TNF, licensing basis events (LBEs), determined using probabilistic risk assessment methods, take the place of design basis accidents. These LBEs are constructed by grouping together accident sequences with similar phenomenology. All event sequences with a mean frequency greater than 10 −7 per reactor year are to be considered as part of the licensing basis. Imposing such a limit would require that earthquakes with a mean return period of ten million years be considered as part of the licensing basis. It is difficult to get seismic hazards (i.e., ground accelerations) from expert seismologists at such low frequencies. This is because it is difficult or impossible to confidently say what the seismic hazard might be at these extremely low frequencies. A linear extrapolation in log-log space of hazard curves at the Clinton site down to 10 −7 per year leads to a peak ground acceleration of about 4.5 g. A Weibull distribution is also used to fit the curve leading to a peak ground acceleration of about 2.6 g. These extrapolations demonstrate the extreme nature of rare earthquakes. Even when seismic isolation is implemented, the TNF goal is not met. The problem appears to be that there is no limit on initiating event frequency in the TNF. Demonstrating that a design meets the goals of the TNF would be nearly impossible. A frequency limit for earthquakes could be imposed at a frequency of about 10 −5 per year to focus on

  15. A risk evaluation model using on-site meteorological data

    International Nuclear Information System (INIS)

    Kang, C.S.

    1979-01-01

    A model is considered in order to evaluate the potential risk from a nuclear facility directly combining the on site meteorological data. The model is utilized to evaluate the environmental consequences from the routine releases during normal plant operation as well as following postulated accidental releases. The doses to individual and risks to the population-at-large are also analyzed in conjunction with design of rad-waste management and safety systems. It is observed that the conventional analysis, which is done in two separate unaffiliated phases of releases and atmospheric dispersion tends to result in unnecessary over-design of the systems because of high resultant doses calculated by multiplication of two extreme values. (author)

  16. Towards risk-based structural integrity methods for PWRs

    International Nuclear Information System (INIS)

    Chapman, O.J.V.; Lloyd, R.B.

    1992-01-01

    This paper describes the development of risk-based structural integrity assurance methods and their application to Pressurized Water Reactor (PWR) plant. In-service inspection is introduced as a way of reducing the failure probability of high risk sites and the latter are identified using reliability analysis; the extent and interval of inspection can also be optimized. The methodology is illustrated by reference to the aspect of reliability of weldments in PWR systems. (author)

  17. Qualitative risk assessment during polymer mortar test specimens preparation - methods comparison

    Science.gov (United States)

    Silva, F.; Sousa, S. P. B.; Arezes, P.; Swuste, P.; Ribeiro, M. C. S.; Baptista, J. S.

    2015-05-01

    Polymer binder modification with inorganic nanomaterials (NM) could be a potential and efficient solution to control matrix flammability of polymer concrete (PC) materials without sacrificing other important properties. Occupational exposures can occur all along the life cycle of a NM and “nanoproducts” from research through scale-up, product development, manufacturing, and end of life. The main objective of the present study is to analyse and compare different qualitative risk assessment methods during the production of polymer mortars (PM) with NM. The laboratory scale production process was divided in 3 main phases (pre-production, production and post-production), which allow testing the assessment methods in different situations. The risk assessment involved in the manufacturing process of PM was made by using the qualitative analyses based on: French Agency for Food, Environmental and Occupational Health & Safety method (ANSES); Control Banding Nanotool (CB Nanotool); Ecole Polytechnique Fédérale de Lausanne method (EPFL); Guidance working safely with nanomaterials and nanoproducts (GWSNN); Istituto Superiore per la Prevenzione e la Sicurezza del Lavoro, Italy method (ISPESL); Precautionary Matrix for Synthetic Nanomaterials (PMSN); and Stoffenmanager Nano. It was verified that the different methods applied also produce different final results. In phases 1 and 3 the risk assessment tends to be classified as medium-high risk, while for phase 2 the more common result is medium level. It is necessary to improve the use of qualitative methods by defining narrow criteria for the methods selection for each assessed situation, bearing in mind that the uncertainties are also a relevant factor when dealing with the risk related to nanotechnologies field.

  18. Qualitative risk assessment during polymer mortar test specimens preparation - methods comparison

    International Nuclear Information System (INIS)

    Silva, F; Sousa, S P B; Ribeiro, M C S; Arezes, P; Swuste, P; Baptista, J S

    2015-01-01

    Polymer binder modification with inorganic nanomaterials (NM) could be a potential and efficient solution to control matrix flammability of polymer concrete (PC) materials without sacrificing other important properties. Occupational exposures can occur all along the life cycle of a NM and “nanoproducts” from research through scale-up, product development, manufacturing, and end of life. The main objective of the present study is to analyse and compare different qualitative risk assessment methods during the production of polymer mortars (PM) with NM. The laboratory scale production process was divided in 3 main phases (pre-production, production and post-production), which allow testing the assessment methods in different situations. The risk assessment involved in the manufacturing process of PM was made by using the qualitative analyses based on: French Agency for Food, Environmental and Occupational Health and Safety method (ANSES); Control Banding Nanotool (CB Nanotool); Ecole Polytechnique Fédérale de Lausanne method (EPFL); Guidance working safely with nanomaterials and nanoproducts (GWSNN); Istituto Superiore per la Prevenzione e la Sicurezza del Lavoro, Italy method (ISPESL); Precautionary Matrix for Synthetic Nanomaterials (PMSN); and Stoffenmanager Nano. It was verified that the different methods applied also produce different final results. In phases 1 and 3 the risk assessment tends to be classified as medium-high risk, while for phase 2 the more common result is medium level. It is necessary to improve the use of qualitative methods by defining narrow criteria for the methods selection for each assessed situation, bearing in mind that the uncertainties are also a relevant factor when dealing with the risk related to nanotechnologies field. (paper)

  19. Comprehensive risk assessment method of catastrophic accident based on complex network properties

    Science.gov (United States)

    Cui, Zhen; Pang, Jun; Shen, Xiaohong

    2017-09-01

    On the macro level, the structural properties of the network and the electrical characteristics of the micro components determine the risk of cascading failures. And the cascading failures, as a process with dynamic development, not only the direct risk but also potential risk should be considered. In this paper, comprehensively considered the direct risk and potential risk of failures based on uncertain risk analysis theory and connection number theory, quantified uncertain correlation by the node degree and node clustering coefficient, then established a comprehensive risk indicator of failure. The proposed method has been proved by simulation on the actual power grid. Modeling a network according to the actual power grid, and verified the rationality of the proposed method.

  20. Screening-Level Ecological Risk Assessment Methods, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Mirenda, Richard J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2012-08-16

    This document provides guidance for screening-level assessments of potential adverse impacts to ecological resources from release of environmental contaminants at the Los Alamos National Laboratory (LANL or the Laboratory). The methods presented are based on two objectives, namely: to provide a basis for reaching consensus with regulators, managers, and other interested parties on how to conduct screening-level ecological risk investigations at the Laboratory; and to provide guidance for ecological risk assessors under the Environmental Programs (EP) Directorate. This guidance promotes consistency, rigor, and defensibility in ecological screening investigations and in reporting those investigation results. The purpose of the screening assessment is to provide information to the risk managers so informed riskmanagement decisions can be made. This document provides examples of recommendations and possible risk-management strategies.

  1. A Pattern-Oriented Approach to a Methodical Evaluation of Modeling Methods

    Directory of Open Access Journals (Sweden)

    Michael Amberg

    1996-11-01

    Full Text Available The paper describes a pattern-oriented approach to evaluate modeling methods and to compare various methods with each other from a methodical viewpoint. A specific set of principles (the patterns is defined by investigating the notations and the documentation of comparable modeling methods. Each principle helps to examine some parts of the methods from a specific point of view. All principles together lead to an overall picture of the method under examination. First the core ("method neutral" meaning of each principle is described. Then the methods are examined regarding the principle. Afterwards the method specific interpretations are compared with each other and with the core meaning of the principle. By this procedure, the strengths and weaknesses of modeling methods regarding methodical aspects are identified. The principles are described uniformly using a principle description template according to descriptions of object oriented design patterns. The approach is demonstrated by evaluating a business process modeling method.

  2. Methods and models used in comparative risk studies

    International Nuclear Information System (INIS)

    Devooght, J.

    1983-01-01

    Comparative risk studies make use of a large number of methods and models based upon a set of assumptions incompletely formulated or of value judgements. Owing to the multidimensionality of risks and benefits, the economic and social context may notably influence the final result. Five classes of models are briefly reviewed: accounting of fluxes of effluents, radiation and energy; transport models and health effects; systems reliability and bayesian analysis; economic analysis of reliability and cost-risk-benefit analysis; decision theory in presence of uncertainty and multiple objectives. Purpose and prospect of comparative studies are assessed in view of probable diminishing returns for large generic comparisons [fr

  3. Examination of State-Level Nuclear Security Evaluation Methods

    International Nuclear Information System (INIS)

    Kim, Chan Kim; Yim, Man-Sung

    2015-01-01

    An effective global system for nuclear materials security needs to cover all materials, employing international standards and best practices, to reduce risks by reducing weapons-usable nuclear material stocks and the number of locations where they are found. Such a system must also encourage states to accept peer reviews by outside experts in order to demonstrate that effective security is in place. It is thus critically important to perform state-level evaluation of nuclear security based on an integrative framework of risk assessment. Such evaluation provides a basis of measuring the level and progress of international effort to secure and control all nuclear materials. sensitivity test by differentiating weight factors of each of the indicators and categories will be performed in the future as well

  4. Method ranks competing projects by priorities, risk

    International Nuclear Information System (INIS)

    Moeckel, D.R.

    1993-01-01

    A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerning various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time

  5. A New Method for Spatial Health Risk Assessment of Pollutants

    Directory of Open Access Journals (Sweden)

    Mohamad Sakizadeh*

    2017-03-01

    Full Text Available Background: The area of contaminated lands exposed to the health risk of environmental pollutants is a matter of argument. In this study, a new method was developed to estimate the amount of area that is exposed to higher than normal levels of Cr, Mn, and V. Methods: Overall, 170 soil samples were collected from the upper 10 cm of soil in an arid area in central part of Iran in Semnan Province. The values of Cr, Mn, and V were detected by ICP-OES technique. A geostatistical method known as sequential Gaussian co-simulation was applied to consider the spatial risk of these toxic elements. Results: The moderate spatial dependence of Cr indicates the contribution of both intrinsic and extrinsic factor to the levels of this heavy metal in the study area, whereas, Mn and V can be attributed to intrinsic factors (such as lithology. There has not been any significant influence due to agricultural practices on the Cr values in the region. The surface of contaminated area for manganese, produced by risk curve on surface method, was higher than chromium and vanadium. Conclusion: The produced risk curves as rendered in this study can be adopted in similar studies to help managers to estimate the total area that requires cleanup action.

  6. New Tools and Methods for Assessing Risk-Management Strategies

    National Research Council Canada - National Science Library

    Vendlinski, Terry P; Munro, Allen; Chung, Gregory K; De la Cruz, Girlie C; Pizzini, Quentin A; Bewley, William L; Stuart, Gale; Baker, Eva L

    2004-01-01

    .... The Decision Analysis Tool (DAT) allowed subjects to use Expected Value and Multi-attribute Utility Theories to evaluate the risks and benefits of various acquisition alternatives, and allowed us to monitor the process subjects used...

  7. An Integrated Health Monitoring Method for Structural Fatigue Life Evaluation Using Limited Sensor Data

    Directory of Open Access Journals (Sweden)

    Jingjing He

    2016-11-01

    Full Text Available A general framework for structural fatigue life evaluation under fatigue cyclic loading using limited sensor data is proposed in this paper. First, limited sensor data are measured from various sensors which are preset on the complex structure. Then the strain data at remote spots are used to obtain the strain responses at critical spots by the strain/stress reconstruction method based on empirical mode decomposition (REMD method. All the computations in this paper are directly performed in the time domain. After the local stress responses at critical spots are determined, fatigue life evaluation can be performed for structural health management and risk assessment. Fatigue life evaluation using the reconstructed stresses from remote strain gauge measurement data is also demonstrated with detailed error analysis. Following this, the proposed methodology is demonstrated using a three-dimensional frame structure and a simplified airfoil structure. Finally, several conclusions and future work are drawn based on the proposed study.

  8. A framework and case studies for evaluation of enzyme ontogeny in children's health risk evaluation.

    Science.gov (United States)

    Ginsberg, Gary; Vulimiri, Suryanarayana V; Lin, Yu-Sheng; Kancherla, Jayaram; Foos, Brenda; Sonawane, Babasaheb

    2017-01-01

    Knowledge of the ontogeny of Phase I and Phase II metabolizing enzymes may be used to inform children's vulnerability based upon likely differences in internal dose from xenobiotic exposure. This might provide a qualitative assessment of toxicokinetic (TK) variability and uncertainty pertinent to early lifestages and help scope a more quantitative physiologically based toxicokinetic (PBTK) assessment. Although much is known regarding the ontogeny of metabolizing systems, this is not commonly utilized in scoping and problem formulation stage of human health risk evaluation. A framework is proposed for introducing this information into problem formulation which combines data on enzyme ontogeny and chemical-specific TK to explore potential child/adult differences in internal dose and whether such metabolic differences may be important factors in risk evaluation. The framework is illustrated with five case study chemicals, including some which are data rich and provide proof of concept, while others are data poor. Case studies for toluene and chlorpyrifos indicate potentially important child/adult TK differences while scoping for acetaminophen suggests enzyme ontogeny is unlikely to increase early-life risks. Scoping for trichloroethylene and aromatic amines indicates numerous ways that enzyme ontogeny may affect internal dose which necessitates further evaluation. PBTK modeling is a critical and feasible next step to further evaluate child-adult differences in internal dose for a number of these chemicals.

  9. Evaluation of risk management and financial performance of BMW Group

    OpenAIRE

    Mysina, Amira

    2017-01-01

    Effective risk and financial management possess a great challenge for the multinational companies operating globally. Despite the increasing development of diverse hedging strategies against foreign exchange risk, global firms cannot fully foresee and measure the degree of the impact of foreign currency fluctuations. This paper aims to evaluate the exchange risk management and financial performance of the BMW Group from the year 2005 to 2016. Moreover, this paper is devoted to provide explana...

  10. Advances in Imaging Approaches to Fracture Risk Evaluation

    Science.gov (United States)

    Manhard, Mary Kate; Nyman, Jeffry S.; Does, Mark D.

    2016-01-01

    Fragility fractures are a growing problem worldwide, and current methods for diagnosing osteoporosis do not always identify individuals who require treatment to prevent a fracture and may misidentify those not a risk. Traditionally, fracture risk is assessed using dual-energy X-ray absorptiometry, which provides measurements of areal bone mineral density (BMD) at sites prone to fracture. Recent advances in imaging show promise in adding new information that could improve the prediction of fracture risk in the clinic. As reviewed herein, advances in quantitative computed tomography (QCT) predict hip and vertebral body strength; high resolution HR-peripheral QCT (HR-pQCT) and micro-magnetic resonance imaging (μMRI) assess the micro-architecture of trabecular bone; quantitative ultrasound (QUS) measures the modulus or tissue stiffness of cortical bone; and quantitative ultra-short echo time MRI methods quantify the concentrations of bound water and pore water in cortical bone, which reflect a variety of mechanical properties of bone. Each of these technologies provides unique characteristics of bone and may improve fracture risk diagnoses and reduce prevalence of fractures by helping to guide treatment decisions. PMID:27816505

  11. Optimizing Usability Studies by Complementary Evaluation Methods

    NARCIS (Netherlands)

    Schmettow, Martin; Bach, Cedric; Scapin, Dominique

    2014-01-01

    This paper examines combinations of complementary evaluation methods as a strategy for efficient usability problem discovery. A data set from an earlier study is re-analyzed, involving three evaluation methods applied to two virtual environment applications. Results of a mixed-effects logistic

  12. Methods for measuring risk-aversion: problems and solutions

    International Nuclear Information System (INIS)

    Thomas, P J

    2013-01-01

    Risk-aversion is a fundamental parameter determining how humans act when required to operate in situations of risk. Its general applicability has been discussed in a companion presentation, and this paper examines methods that have been used in the past to measure it and their attendant problems. It needs to be borne in mind that risk-aversion varies with the size of the possible loss, growing strongly as the possible loss becomes comparable with the decision maker's assets. Hence measuring risk-aversion when the potential loss or gain is small will produce values close to the risk-neutral value of zero, irrespective of who the decision maker is. It will also be shown how the generally accepted practice of basing a measurement on the results of a three-term Taylor series will estimate a limiting value, minimum or maximum, rather than the value utilised in the decision. A solution is to match the correct utility function to the results instead

  13. Methods for measuring risk-aversion: problems and solutions

    Science.gov (United States)

    Thomas, P. J.

    2013-09-01

    Risk-aversion is a fundamental parameter determining how humans act when required to operate in situations of risk. Its general applicability has been discussed in a companion presentation, and this paper examines methods that have been used in the past to measure it and their attendant problems. It needs to be borne in mind that risk-aversion varies with the size of the possible loss, growing strongly as the possible loss becomes comparable with the decision maker's assets. Hence measuring risk-aversion when the potential loss or gain is small will produce values close to the risk-neutral value of zero, irrespective of who the decision maker is. It will also be shown how the generally accepted practice of basing a measurement on the results of a three-term Taylor series will estimate a limiting value, minimum or maximum, rather than the value utilised in the decision. A solution is to match the correct utility function to the results instead.

  14. IMPROVED METHODS FOR EVALUATING THE EFFECTIVENESS OF INNOVATION DEVELOPMENT IN RUSSIAN CORPORATIONS

    Directory of Open Access Journals (Sweden)

    E. L. Dorzhieva

    2016-01-01

    Full Text Available Objectives. Innovative activity is a key factor in the effective development and growth of competitiveness in the Russian economy. An important role in this process is played by industrial corporations. Against this background, there is an increased need for improving the effectiveness of methods for evaluating the innovation development of Russian corporations. Methods. Formal logic as well as system analysis methods were used in the research, allowing us to consider the corporation as a system that includes a variety of innovational directions (elements. Results. The article discusses various approaches to the determination of the basic definitions of innovation; a classification of innovation is proposed. The attributes of innovative activity of industrial corporations are distinguished together with an outline of the possible causes of various innovative corporate activities; components of the system of indicators of innovation activity are isolated: financial; consumer; process; development and training; risk management. The need for the indices of the innovation activity of the risk component to be included in the composition of the system is substantiated. It is shown how the objectives for each area of innovation may be achieved in tandem with a methodological approach that allows continuous monitoring of the implementation of innovative development strategies. An algorithm for evaluating the implementation of innovative strategies contributing to the development of industrial corporations is presented. Conclusion. Theoretical and methodological development can be used not only to navigate the variety of innovations but also to determine and establish the relationship and interdependence between the various innovations as well as carry out analysis, assessment and forecasting for the effective development of innovative activity of Russian corporations. 

  15. The Muhlbauer method for pipeline risk management in onshore environment; O metodo de Muhlbauer para gerenciamento de risco em linhas de dutos em ambiente 'onshore'

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, Alexandro G.; Miguelis, Paula M.F. [UNIPAMPA, RS (Brazil)

    2008-07-01

    There are several methods for the risk assessment and risk management applied to pipelines, among them the Muhlbauer's Method. W. Kent Muhlbauer is an internationally recognized authority on pipeline risk management. He made a detailed identification about 300 distinct conditions that influence the risk assessment in pipelines and he proposed a score system that is known as method of Muhlbauer. The purpose of this model is to evaluate the public exposure to the risk and identify ways for management that risk in fact. The assessment is made by the attribution of quantitative values to the several items that influences in the pipeline risk. This paper approaches the Muhlbauer's basic model for risk assessment and management in pipelines. In the beginning, the basic model for risk assessment is presented, and methodology for pipelines in onshore environment is detailed. After, presents major items in risk assessment and this relative score. Finally, present the additional modules for Muhlbauer's method customizing. (author)

  16. Geophysical methods for evaluation of plutonic rocks

    International Nuclear Information System (INIS)

    Gibb, R.A.; Scott, J.S.

    1986-04-01

    Geophysical methods are systematically described according to the physical principle and operational mode of each method, the type of information produced, limitations of a technical and/or economic nature, and the applicability of the method to rock-mass evaluation at Research Areas of the Nuclear Fuel Waste Management Program. The geophysical methods fall into three categories: (1) airborne and other reconnaissance surveys, (2) detailed or surface (ground) surveys, and (3) borehole or subsurface surveys. The possible roles of each method in the site-screening and site-evaluation processes of disposal vault site selection are summarized

  17. Risk management for engineering projects procedures, methods and tools

    CERN Document Server

    Munier, Nolberto

    2014-01-01

    Many people see risk in engineering projects as an imprecise and nebulous problem - something that exists, is feared and is impossible to deal with. Nothing could be further from the truth. While risk is certainly ubiquitous, sometimes difficult to detect, and cannot always be completely avoided, it can generally be mitigated, reduced or prevented through timely analysis and action.   This book covers the entire process of risk management by providing methodologies for determining the sources of project risk, and once threats have been identified, managing them through:   ·         identification and assessment (probability, relative importance, variables, risk breakdown structure, etc.) ·         implementation of measures for their prevention, reduction or mitigation ·         evaluation of impacts and quantification of risks ·         establishment of control measures   It also considers sensitivity analysis to determine the influence of uncertain parameters values ...

  18. Risk-based prioritization method for the classification of groundwater pesticide pollution from agricultural regions.

    Science.gov (United States)

    Yang, Yu; Lian, Xin-Ying; Jiang, Yong-Hai; Xi, Bei-Dou; He, Xiao-Song

    2017-11-01

    Agricultural regions are a significant source of groundwater pesticide pollution. To ensure that agricultural regions with a significantly high risk of groundwater pesticide contamination are properly managed, a risk-based ranking method related to groundwater pesticide contamination is needed. In the present paper, a risk-based prioritization method for the classification of groundwater pesticide pollution from agricultural regions was established. The method encompasses 3 phases, including indicator selection, characterization, and classification. In the risk ranking index system employed here, 17 indicators involving the physicochemical properties, environmental behavior characteristics, pesticide application methods, and inherent vulnerability of groundwater in the agricultural region were selected. The boundary of each indicator was determined using K-means cluster analysis based on a survey of a typical agricultural region and the physical and chemical properties of 300 typical pesticides. The total risk characterization was calculated by multiplying the risk value of each indicator, which could effectively avoid the subjectivity of index weight calculation and identify the main factors associated with the risk. The results indicated that the risk for groundwater pesticide contamination from agriculture in a region could be ranked into 4 classes from low to high risk. This method was applied to an agricultural region in Jiangsu Province, China, and it showed that this region had a relatively high risk for groundwater contamination from pesticides, and that the pesticide application method was the primary factor contributing to the relatively high risk. The risk ranking method was determined to be feasible, valid, and able to provide reference data related to the risk management of groundwater pesticide pollution from agricultural regions. Integr Environ Assess Manag 2017;13:1052-1059. © 2017 SETAC. © 2017 SETAC.

  19. EVALUATION OF THE PREVALENCE OF THE PERIODONTAL DISEASE VERSUS SYSTEMIC AND LOCAL RISK FACTORS

    Directory of Open Access Journals (Sweden)

    Silvia MÂRŢU

    2013-07-01

    Full Text Available Introduction: The periodontal disease represents a malady characterized by an extremely high incidence. The manifestations and evolution of the periodontal diseases vary for each form in part, being influenced by systemic and local risk factors. Scope of the study: To evaluate the periodontal status on a group of patients, versus the syste‐ mic and local factors. Materials and method: The study was performed on a group of 170 patients, whose odonto‐periodontal status was evaluated by strict clinical and paraclinical examinations, on establishing the inflammation indices and the periodontal diagnosis. Results: The main cause of the analysis was gingival ble‐ eding; an increased number of smokers was registered among the patients. Out of the local factors, especially important were edentations and malocclusions. Also, a higher number of aggressive generalized periodontites has been noticed. Discussion: The forms of the periodontal diseases are obviously influenced by the systemic context, while the forms of localized chronic periodontitis associa‐ ted with generalized chronic gingivitis reflect the role pla‐ yed by the local risk factors. Conclusions: Stress and smoking represent significant risk factors in the installation of periodontal pathology, with a really alarming preva‐ lence. The aggressive forms of periodontitis showed a higher frequency than that recorded in literature.

  20. Analysis and Risk Evaluation on the Case of Alteration, Revitalization and Conversion of a Historic Building in Gdańsk

    Science.gov (United States)

    Grzyl, Beata; Kristowski, Adam; Miszewska-Urbańska, Emilia

    2017-10-01

    Each investment plan, including the one concerning a building, is exposed to the consequences of various types of threats taking place. Therefore, in the case of some large-scale, atypical and complicated building ventures, some actions included in the procedure of risk management should be taken (identifications, analysis, measurements, control and supervision of the risk). This will allow for the risk to be eliminated or limited. While preparing a building venture, an investor does not possess full information about the course of events on each stage of investment completion. The identification of the above-mentioned unknowns, subjecting them to quantification and specifying the method of dealing with them, allows an investor to increase the effectiveness of the intended plan. The enterprise discussed in this article and analyzed in the context of risk, concerns alteration, revitalization and conversion for office purposes of two buildings located in Gdańsk at 1 and 2 Lastadia Street. These buildings are situated on the area of historical urban layout of Gdańsk, in the northern-eastern part of Stare Przedmieście District (Old Suburb), about 800 meters south from Dlugi Targ Street and 200 meters west from The Old Motława River. The investor is “Gdańskie Melioracje Ltd.”, a limited liability company, which belongs to the Council of Gdańsk. In order to increase the effectiveness of the intended investment venture, while organizing the investment process, the investor commissioned preparation of an analysis and risk evaluation connected with the above-mentioned intention. Based on an on-site visit, the opinions of experts, who have been involved in the process of the preparation of the investment, studies of the available monographies about the technical condition of the buildings at 1 and 2 Lastadia Street and their own experiences, the authors identified 54 types of relevant risks, which have been systematized into 10 subject groups (among others