WorldWideScience

Sample records for risk assessment utilizing

  1. Development of a system utilizing data of risk assessment

    International Nuclear Information System (INIS)

    Nagasaka, Akihiko; Takano, Kenichi; Ebisu, Mitsuhiro; Aikawa, Tadashi; Hayase, Kenichi

    2004-01-01

    This report deals with a concrete method of utilizing data of risk assessment. First, the authors point out the necessity to assess all stages of jobs (planning, meeting with contractors, performing phase of task, etc.) in risk assessment bout jobs in electric power company, because most jobs are performed by contract system and risks of a job are distributed over electric company, contractors and subcontractors. Secondly, risks estimated from past accidents and near-miss events must be included. If these 2 requirements are fulfilled, data of risk assessment can be more useful. Then below 4 forms of present data of risk assessment were developed. A form to be used in job planning stage in electric companies for efficient investment planning in safety measures. A form to be used in meetings between electric companies and contractors for checking accident prevention methods. A form to be used in meetings between contractors and subcontractors for enhancing a shared awareness of risk. A form to be used in tool box meetings for confirming safe condition and inheriting of ability of risk perception. Additionally, a data base system of risk assessment about 4 jobs was developed. This system prints out about 4 forms for each job and is useful for PDCA of safety activities. (author)

  2. Report on probabilistic safety assessment (PSA) quality assurance in utilization of risk information

    International Nuclear Information System (INIS)

    2006-12-01

    Recently in Japan, introduction of nuclear safety regulations using risk information such as probabilistic safety assessment (PSA) has been considered and utilization of risk information in the rational and practical measures on safety assurance has made a progress to start with the operation or inspection area. The report compiled results of investigation and studies of PSA quality assurance in risk-informed activities in the USA. Relevant regulatory guide and standard review plan as well as issues and recommendations were reviewed for technical adequacy and advancement of probabilistic risk assessment technology in risk-informed decision making. Useful and important information to be referred as issues in PSA quality assurance was identified. (T. Tanaka)

  3. Utilizing toxicogenomic data to understand chemical mechanism of action in risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Vickie S., E-mail: wilson.vickie@epa.gov [National Health and Environmental Effects Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, Research Triangle Park, NC 27711 (United States); Keshava, Nagalakshmi [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW, Washington, DC 20460 (United States); Hester, Susan [National Health and Environmental Effects Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, Research Triangle Park, NC 27711 (United States); Segal, Deborah; Chiu, Weihsueh [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW, Washington, DC 20460 (United States); Thompson, Chad M. [ToxStrategies, Inc., 23501 Cinco Ranch Blvd., Suite G265, Katy, TX 77494 (United States); Euling, Susan Y. [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW, Washington, DC 20460 (United States)

    2013-09-15

    The predominant role of toxicogenomic data in risk assessment, thus far, has been one of augmentation of more traditional in vitro and in vivo toxicology data. This article focuses on the current available examples of instances where toxicogenomic data has been evaluated in human health risk assessment (e.g., acetochlor and arsenicals) which have been limited to the application of toxicogenomic data to inform mechanism of action. This article reviews the regulatory policy backdrop and highlights important efforts to ultimately achieve regulatory acceptance. A number of research efforts on specific chemicals that were designed for risk assessment purposes have employed mechanism or mode of action hypothesis testing and generating strategies. The strides made by large scale efforts to utilize toxicogenomic data in screening, testing, and risk assessment are also discussed. These efforts include both the refinement of methodologies for performing toxicogenomics studies and analysis of the resultant data sets. The current issues limiting the application of toxicogenomics to define mode or mechanism of action in risk assessment are discussed together with interrelated research needs. In summary, as chemical risk assessment moves away from a single mechanism of action approach toward a toxicity pathway-based paradigm, we envision that toxicogenomic data from multiple technologies (e.g., proteomics, metabolomics, transcriptomics, supportive RT-PCR studies) can be used in conjunction with one another to understand the complexities of multiple, and possibly interacting, pathways affected by chemicals which will impact human health risk assessment.

  4. Utilizing toxicogenomic data to understand chemical mechanism of action in risk assessment

    International Nuclear Information System (INIS)

    Wilson, Vickie S.; Keshava, Nagalakshmi; Hester, Susan; Segal, Deborah; Chiu, Weihsueh; Thompson, Chad M.; Euling, Susan Y.

    2013-01-01

    The predominant role of toxicogenomic data in risk assessment, thus far, has been one of augmentation of more traditional in vitro and in vivo toxicology data. This article focuses on the current available examples of instances where toxicogenomic data has been evaluated in human health risk assessment (e.g., acetochlor and arsenicals) which have been limited to the application of toxicogenomic data to inform mechanism of action. This article reviews the regulatory policy backdrop and highlights important efforts to ultimately achieve regulatory acceptance. A number of research efforts on specific chemicals that were designed for risk assessment purposes have employed mechanism or mode of action hypothesis testing and generating strategies. The strides made by large scale efforts to utilize toxicogenomic data in screening, testing, and risk assessment are also discussed. These efforts include both the refinement of methodologies for performing toxicogenomics studies and analysis of the resultant data sets. The current issues limiting the application of toxicogenomics to define mode or mechanism of action in risk assessment are discussed together with interrelated research needs. In summary, as chemical risk assessment moves away from a single mechanism of action approach toward a toxicity pathway-based paradigm, we envision that toxicogenomic data from multiple technologies (e.g., proteomics, metabolomics, transcriptomics, supportive RT-PCR studies) can be used in conjunction with one another to understand the complexities of multiple, and possibly interacting, pathways affected by chemicals which will impact human health risk assessment

  5. Efforts to utilize risk assessment at nuclear power plants

    International Nuclear Information System (INIS)

    Narumiya, Yoshiyuki

    2015-01-01

    Risk assessment means the use of the outputs that have been obtained through risk identification and risk analysis (risk information), followed by the determination of the response policy by comparing these outputs with the risk of judgement standards. This paper discusses the use of risk information with multifaceted nature and its significance, and the challenges to the further penetration of these items. As the lessons and risk assessment learnt from the past accidents, this paper takes up the cases of the severe accidents of Three Mile Island, Chernobyl, and Fukushima Daiichi power stations, and discusses their causes and expansion factors. In particular, at Fukushima Daiichi Nuclear Power Station, important lessons were shortage in measures against the superimposition of earthquake and tsunami, and the insufficient use of risk assessment. This paper classified risk assessment from the viewpoint of risk information, and showed the contents and index for each item of risk reduction trends, risk increase trends, and measures according to the importance of risk. As the benefits of activities due to risk assessment, this paper referred to the application cases of the probabilistic risk assessment (PRA) of IAEA, and summarized the application activities of 10 items of risk indexes by classifying them to safety benefits and operational benefits. For example, in the item of flexible Allowed Outage Time (AOT), the avoidance of plant shutdown and the flexibility improvement of maintenance scheduling at a plant are corresponding to the above-mentioned benefits, respectively. (A.O.)

  6. Health risk assessment for a MWC ash utilization demonstration project

    International Nuclear Information System (INIS)

    Roffman, H.K.

    1992-01-01

    A Health Risk Assessment (HRA) was conducted for the proposed joint Hennepin County/Municipal Services Corporation (MSC) MSW Ash Utilization Demonstration Project, in which combined HERC ash was shipped to the MSC Pilot Plan near Atlanta, Georgia and used in the production of a synthetic aggregate. The synthetic aggregate, or TAP, will serve as a partial replacement for natural aggregates in a section of bituminous pavement that is proposed to be constructed on Pioneer Trail in the City of Corcoran, Minnesota. In this paper, the assessment compares the following three scenarios: a section of roadway paved using the MSC synthetic aggregate product (TAP) as a replacement for 30 percent of the natural aggregates used in bituminous pavement; a section of regular bituminous (asphalt) pavement; and a section of unpaved road currently in place at the site

  7. Framework for Shared Drinking Water Risk Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    Lowry, Thomas Stephen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Tidwell, Vincent C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Peplinski, William John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Mitchell, Roger [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Binning, David [AEM Corp., Herndon, VA (United States); Meszaros, Jenny [AEM Corp., Herndon, VA (United States)

    2017-01-01

    Central to protecting our nation's critical infrastructure is the development of methodologies for prioritizing action and supporting resource allocation decisions associated with risk-reduction initiatives. Toward this need a web-based risk assessment framework that promotes the anonymous sharing of results among water utilities is demonstrated. Anonymous sharing of results offers a number of potential advantages such as assistance in recognizing and correcting bias, identification of 'unknown, unknowns', self-assessment and benchmarking for the local utility, treatment of shared assets and/or threats across multiple utilities, and prioritization of actions beyond the scale of a single utility. The constructed framework was demonstrated for three water utilities. Demonstration results were then compared to risk assessment results developed using a different risk assessment application by a different set of analysts.

  8. Research on risk assessment for maritime transport of radioactive materials. Preparation of maritime accident data for risk assessment

    International Nuclear Information System (INIS)

    Odano, Naoteru; Sawada, Ken-ichi; Mochiduki, Hiromitsu; Hirao, Yoshihiro; Asami, Mitsufumi

    2010-01-01

    Maritime transport of radioactive materials has been playing an important role in the nuclear fuel cycle in Japan. Due to recent increase of transported radioactive materials and diversification of transport packages with enlargement of nuclear research, development and utilization, safety securement for maritime transport of radioactive materials is one of important issues in the nuclear fuel cycle. Based squarely on the current circumstances, this paper summarizes discussion on importance of utilization of results of risk assessment for maritime transport of radioactive materials. A plan for development of comprehensive methodology to assess risks in maritime transport of radioactive materials is also described. Preparations of database of maritime accident to be necessary for risk assessment are also summarized. The prepared data could be utilized for future quantitative risk assessment, such as the event trees and fault trees analyses, for maritime transport of radioactive materials. The frequency of severe accident that the package might be damaged is also estimated using prepared data. (author)

  9. Concept of risk: risk assessment and nuclear safety

    International Nuclear Information System (INIS)

    Thompson, P.B.

    1980-01-01

    The dissertation is a critical examination of risk assessment and its role in public policy. Nuclear power safety safety issues are selected as the primary source of illustrations and examples. The dissertation examines how risk assessment studies develop a concept of risk which becomes decisive for policy choices. Risk-assessment techniques are interpreted as instruments which secure an evaluation of risk which, in turn, figures prominently in technical reports on nuclear power. The philosophical critique is mounted on two levels. First, an epistemological critique surveys distinctions between the technical concept of risk and more familiar senses of risk. The critique shows that utilization of risk assessment re-structures the concept of risk. The technical concept is contrasted to the function of risk within a decision-maker's conceptual agenda and hierarchy of values. Second, an ethical critique exposes the value commitments of risk assessment recommendations. Although some of these values might be defended for policy decisions, the technical character of risk assessment obfuscates normative issues. Risk assessment is shown to be a form of factual enquiry which, nonetheless, represents a commitment to a specific selection of ethical and social values. Risk assessment should not be interpreted as a primary guide to decision unless the specific values incorporated into its concept of risk are stated explicitly and justified philosophically. Such a statement would allow value questions which have been sublimated by the factual tone of the analytic techniques to be debated on clear, social and ethical grounds

  10. Risk and utility in portfolio optimization

    Science.gov (United States)

    Cohen, Morrel H.; Natoli, Vincent D.

    2003-06-01

    Modern portfolio theory (MPT) addresses the problem of determining the optimum allocation of investment resources among a set of candidate assets. In the original mean-variance approach of Markowitz, volatility is taken as a proxy for risk, conflating uncertainty with risk. There have been many subsequent attempts to alleviate that weakness which, typically, combine utility and risk. We present here a modification of MPT based on the inclusion of separate risk and utility criteria. We define risk as the probability of failure to meet a pre-established investment goal. We define utility as the expectation of a utility function with positive and decreasing marginal value as a function of yield. The emphasis throughout is on long investment horizons for which risk-free assets do not exist. Analytic results are presented for a Gaussian probability distribution. Risk-utility relations are explored via empirical stock-price data, and an illustrative portfolio is optimized using the empirical data.

  11. State of risk assessment

    International Nuclear Information System (INIS)

    Conrad, J.

    1978-03-01

    In view of the growing importance assumed in recent years by scientific work on the calculation, quantification, evaluation and acceptance as well as behavior in the face of risks in general and more specifically, the risks of large industrial plants, the report attempts to provide a survey of the current situation, results and evaluation of this new branch of research, risk assessment. The emphasis of the report is on the basic discussion and criticism of the theoretical and methodological approaches used in the field of risk assessment (section 3). It is concerned above all with - methodical problems of determining and quantifying risks (3.1) - questions of the possibility of risk evaluation and comp arison (3.1, 3.2) - the premises of normative and empirical studies on decision making under risk (3.2, 3.3) - investigations into society's acceptance of risks involved in the introduction of new technologies (3.4) - attempts to combine various aspects of the field of risk assessment in a unified concept (3.5, 3.6, 3.7). Because risk assessment is embedded in the framework of decision theory and technology assessment, it can be implicitly evaluated at a more general level within this framework, as far as its possibilities and weaknesses of method and application are concerned (section 4). Sections 2 and 5 deal with the social context of origin and utilization of risk assessment. Finally, an attempt is made at a summary indicating the possible future development of risk assessment. (orig./HP) [de

  12. Multi-attribute risk assessment for risk ranking of natural gas pipelines

    International Nuclear Information System (INIS)

    Brito, A.J.; Almeida, A.T. de

    2009-01-01

    The paper presents a decision model for risk assessment and for risk ranking of sections of natural gas pipelines based on multi-attribute utility theory. Pipeline hazard scenarios are surveyed and the reasons for a risk assessment model based on a multi-attribute approach are presented. Three dimensions of impact and the need to translate decision-makers' preferences into risk management decisions are highlighted. The model approaches these factors by using a multi-attribute utility function, in order to produce multi-dimensional risk measurements. By using decision analysis concepts, this model quantitatively incorporates the decision-maker's preferences and behavior regarding risk within clear and consistent risk measurements. In order to support the prioritizing of critical sections of pipeline in natural gas companies, this multi-attribute model also allows sections of pipeline to be ranked into a risk hierarchy. A numerical application based on a real case study was undertaken so that the effectiveness of the decision model could be verified

  13. Genetic toxicology and cancer risk assessment

    National Research Council Canada - National Science Library

    Choy, Wai Nang

    2001-01-01

    ... their risks to humans are obvious goals for the protection of public health. When exposure is unavoidable, an accurate estimation of human risk as a result of exposure is essential for making regulatory decisions. Quantitative cancer risk assessment is an intricate process that utilizes knowledge from many different scien...

  14. Defining utility trace substance emissions and risks

    International Nuclear Information System (INIS)

    Torrens, I.M.

    1993-01-01

    An update is presented on the activities of EPRI and other organizations, including DOE, aimed at improving the quality of available information on utility trace element emissions, control technologies and risks. Because of these efforts, the state of knowledge is advancing rapidly. The 1990 Clean Air Act Amendments aim to reduce emissions of 189 substances that they designate as hazardous air pollutants - commonly called air toxics. The more neutral term open-quotes trace substancesclose quotes is used in this paper, since most are emitted in extremely low concentrations from utility stacks. The degree of toxicity or hazard at these concentrations is subject to considerable uncertainty, and clarifying this is one of the objectives of the work in progress. The most clear and urgent need emanating from the CAAA has been to obtain reliable information on which of the substances on the CAAA list are emitted from different types of power plants - in what amounts, what risks they pose, how much is removed by today's pollution control equipment. EPRI is addressing the issue on several fronts, e.g.; developing a data base and tools that will enable utilities to estimate emissions levels from their power facilities, given the types of fuels burned and plant characteristics; developing a better understanding of how emissions are transported and transformed before they encounter humans and ecological systems; and assessing the risk to public health and the environment posed by utility releases of these substances

  15. Evaluations and utilizations of risk importances

    International Nuclear Information System (INIS)

    Vesely, W.E.; Davis, T.C.

    1985-08-01

    This report presents approaches for utilizing Probabilistic Risk Analyses (PRA's) to determine risk importances. Risk importances are determined for design features, plant operations, and other factors that can affect risk. PRA's can be used to identify the importances of risk contributors or proposed changes to designs or operations. The objective of this report is to serve as a handbook and guide in evaluating and applying risk importances. The utilization of both qualitative risk importances and quantitative risk importances is described in this report. Qualitative risk importances are based on the logic models in the PRA, while quantitative risk importances are based on the quantitative results of the PRA. Both types of importances are among the most robust and meaningful information a PRA can provide. A wide variety of risk importance evaluations are described including evaluations of the importances of design changes, testing, maintenance, degrading environments, and aging. Specific utilizations are described in inspection and in reliability assurance programs, however the general approaches have widespread applicability. The role of personal computers and decision support programs in applying risk importance evaluations is also described

  16. Probabilistic risk assessment: Number 219

    International Nuclear Information System (INIS)

    Bari, R.A.

    1985-01-01

    This report describes a methodology for analyzing the safety of nuclear power plants. A historical overview of plants in the US is provided, and past, present, and future nuclear safety and risk assessment are discussed. A primer on nuclear power plants is provided with a discussion of pressurized water reactors (PWR) and boiling water reactors (BWR) and their operation and containment. Probabilistic Risk Assessment (PRA), utilizing both event-tree and fault-tree analysis, is discussed as a tool in reactor safety, decision making, and communications. (FI)

  17. Violence Risk Assessment Practices in Denmark: A Multidisciplinary National Survey

    Directory of Open Access Journals (Sweden)

    Nielsen Louise Hjort

    2015-12-01

    Full Text Available With a quadrupling of forensic psychiatric patients in Denmark over the past 20 years, focus on violence risk assessment practices across the country has increased. However, information is lacking regarding Danish risk assessment practice across professional disciplines and clinical settings; little is known about how violence risk assessments are conducted, which instruments are used for what purposes, and how mental health professionals rate their utility and costs. As part of a global survey exploring the application of violence risk assessment across 44 countries, the current study investigated Danish practice across several professional disciplines and settings in which forensic and high-risk mental health patients are assessed and treated. In total, 125 mental health professionals across the country completed the survey. The five instruments that respondents reported most commonly using for risk assessment, risk management planning and risk monitoring were Broset, HCR-20, the START, the PCL-R, and the PCL:SV. Whereas the HCR-20 was rated highest in usefulness for risk assessment, the START was rated most useful for risk management and risk monitoring. No significant differences in utility were observed across professional groups. Unstructured clinical judgments were reported to be faster but more expensive to conduct than using a risk assessment instrument. Implications for clinical practice are discussed.

  18. Decision support for utility environmental risk management

    International Nuclear Information System (INIS)

    Balson, W.E.; Wilson, D.S.

    1991-01-01

    This paper reviews a number of decision support methods developed and applied by Decision Focus Incorporated to help utility personnel manage current environmental problems. This work has been performed for the Environmental Risk Analysis Program of EPRI's Environment Division, and also for a number of electric utilities across the country. These are two distinct types of decision support software tools that have been created: economic risk management and environmental risk analysis. These types differ primarily in the identification of who will make a decision. Economic risk management tools are directed primarily at decisions made by electric utilities. Environmental risk analysis tools are directed primarily at decisions made by legislative or regulatory agencies, about which a utility may wish to comment

  19. Dynamic building risk assessment theoretic model for rainstorm-flood utilization ABM and ABS

    Science.gov (United States)

    Lai, Wenze; Li, Wenbo; Wang, Hailei; Huang, Yingliang; Wu, Xuelian; Sun, Bingyun

    2015-12-01

    Flood is one of natural disasters with the worst loss in the world. It needs to assess flood disaster risk so that we can reduce the loss of flood disaster. Disaster management practical work needs the dynamic risk results of building. Rainstorm flood disaster system is a typical complex system. From the view of complex system theory, flood disaster risk is the interaction result of hazard effect objects, rainstorm flood hazard factors, and hazard environments. Agent-based modeling (ABM) is an important tool for complex system modeling. Rainstorm-flood building risk dynamic assessment method (RFBRDAM) was proposed using ABM in this paper. The interior structures and procedures of different agents in proposed meth had been designed. On the Netlogo platform, the proposed method was implemented to assess the building risk changes of the rainstorm flood disaster in the Huaihe River Basin using Agent-based simulation (ABS). The results indicated that the proposed method can dynamically assess building risk of the whole process for the rainstorm flood disaster. The results of this paper can provide one new approach for flood disaster building risk dynamic assessment and flood disaster management.

  20. Evaluation of a constipation risk assessment scale.

    Science.gov (United States)

    Zernike, W; Henderson, A

    1999-06-01

    This project was undertaken in order to evaluate the utility of a constipation risk assessment scale and the accompanying bowel management protocol. The risk assessment scale was primarily introduced to teach and guide staff in managing constipation when caring for patients. The intention of the project was to reduce the incidence of constipation in patients during their admission to hospital.

  1. Significance of earthquake risk in nuclear power plant probabilistic risk assessments

    International Nuclear Information System (INIS)

    Sues, R.H.; Amico, P.J.; Campbell, R.D.

    1990-01-01

    During the last eight years, approximately 25 utility-sponsored probabilistic risk assessments (PRAs) have been conducted for US nuclear reactors. Of these, ten have been published, seven of which have included complete seismic risk assessment. The results of the seven published PRAs are reviewed here in order to ascertain the significance of the risk due to earthquake initiating events. While PRA methodology has been in a state of development over the past seven years, and the results are subject to interpretation (as discussed in the paper), from the review conducted it is clear that earthquake-induced initiating events are important risk contributors. It is concluded that earthquake initiating events should not be dismissed, a priori, in any nuclear plant risk assessment. (orig.)

  2. Tools for Microbiological risk assessment

    DEFF Research Database (Denmark)

    Bassett, john; Nauta, Maarten; Lindqvist, Roland

    can increase the understanding of microbiological risks in foods. It is timely to inform food safety professionals about the availability and utility of MRA tools. Therefore, the focus of this report is to aid the food safety manager by providing a concise summary of the tools available for the MRA......Microbiological Risk Assessment (MRA) has emerged as a comprehensive and systematic approach for addressing the risk of pathogens in specific foods and/or processes. At government level, MRA is increasingly recognised as a structured and objective approach to understand the level of risk in a given...... food/pathogen scenario. Tools developed so far support qualitative and quantitative assessments of the risk that a food pathogen poses to a particular population. Risk can be expressed as absolute numbers or as relative (ranked) risks. The food industry is beginning to appreciate that the tools for MRA...

  3. Resolving inconsistencies in utility measurement under risk: Tests of generalizations of expected utility

    OpenAIRE

    Han Bleichrodt; José María Abellán-Perpiñan; JoséLuis Pinto; Ildefonso Méndez-Martínez

    2005-01-01

    This paper explores inconsistencies that occur in utility measurement under risk when expected utility theory is assumed and the contribution that prospect theory and some other generalizations of expected utility can make to the resolution of these inconsistencies. We used five methods to measure utilities under risk and found clear violations of expected utility. Of the theories studied, prospect theory was the most consistent with our data. The main improvement of prospect theory over expe...

  4. The Effects of Variability and Risk in Selection Utility Analysis: An Empirical Comparison.

    Science.gov (United States)

    Rich, Joseph R.; Boudreau, John W.

    1987-01-01

    Investigated utility estimate variability for the selection utility of using the Programmer Aptitude Test to select computer programmers. Comparison of Monte Carlo results to other risk assessment approaches (sensitivity analysis, break-even analysis, algebraic derivation of the distribtion) suggests that distribution information provided by Monte…

  5. Advanced Test Reactor outage risk assessment

    International Nuclear Information System (INIS)

    Thatcher, T.A.; Atkinson, S.A.

    1997-01-01

    Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance

  6. Qualitative risk assessment as a remediation management tool

    International Nuclear Information System (INIS)

    Knutson, D.E.

    1991-01-01

    The technique used to complete this thesis utilizes existing NRC and EPA guidance on health-based risk to qualitatively prioritize preliminary assessments and provide a tool for the direction and management of remediation activities. This method is intended as a decision making tool to aid in prioritizing the remediation effort and manage the remedial investigation and feasibility study (RI/FS) process. It is not a replacement for the RI/FS. The methodology for qualitative risk assessment utilizes data gathered in preliminary assessments and calculates the health-based hazards and consequences from contaminants found at each individual location. The health-based qualitative risk indicated that number-sign 6 fuel oil, carbon tetrachloride, depleted uranium, and enriched uranium were the contaminants of major concern, in that order. Plutonium ranked approximately sixth in the contaminant of concern priority. 38 refs., 1 fig., 9 tabs

  7. 7 CFR 1730.27 - Vulnerability and Risk Assessment (VRA).

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Vulnerability and Risk Assessment (VRA). 1730.27 Section 1730.27 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES... Requirements § 1730.27 Vulnerability and Risk Assessment (VRA). (a) Each borrower with an approved RUS electric...

  8. Utility of Social Modeling for Proliferation Assessment - Preliminary Findings

    International Nuclear Information System (INIS)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-01-01

    Often the methodologies for assessing proliferation risk are focused around the inherent vulnerability of nuclear energy systems and associated safeguards. For example an accepted approach involves ways to measure the intrinsic and extrinsic barriers to potential proliferation. This paper describes preliminary investigation into non-traditional use of social and cultural information to improve proliferation assessment and advance the approach to assessing nuclear material diversion. Proliferation resistance assessment, safeguard assessments and related studies typically create technical information about the vulnerability of a nuclear energy system to diversion of nuclear material. The purpose of this research project is to find ways to integrate social information with technical information by explicitly considering the role of culture, groups and/or individuals to factors that impact the possibility of proliferation. When final, this work is expected to describe and demonstrate the utility of social science modeling in proliferation and proliferation risk assessments.

  9. Risk Aversion and Expected-Utility Theory: A Calibration Theorem.

    OpenAIRE

    Matthew Rabin.

    2000-01-01

    Within the expected-utility framework, the only explanation for risk aversion is that the utility function for wealth is concave: A person has lower marginal utility for additional wealth when she is wealthy than when she is poor. This paper provides a theorem showing that expected-utility theory is an utterly implausible explanation for appreciable risk aversion over modest stakes: Within expected-utility theory, for any concave utility function, even very little risk aversion over modest st...

  10. Mental Health Professionals' Suicide Risk Assessment and Management Practices.

    Science.gov (United States)

    Roush, Jared F; Brown, Sarah L; Jahn, Danielle R; Mitchell, Sean M; Taylor, Nathanael J; Quinnett, Paul; Ries, Richard

    2018-01-01

    Approximately 20% of suicide decedents have had contact with a mental health professional within 1 month prior to their death, and the majority of mental health professionals have treated suicidal individuals. Despite limited evidence-based training, mental health professionals make important clinical decisions related to suicide risk assessment and management. The current study aimed to determine the frequency of suicide risk assessment and management practices and the association between fear of suicide-related outcomes or comfort working with suicidal individuals and adequacy of suicide risk management decisions among mental health professionals. Mental health professionals completed self-report assessments of fear, comfort, and suicide risk assessment and management practices. Approximately one third of mental health professionals did not ask every patient about current or previous suicidal thoughts or behaviors. Further, comfort, but not fear, was positively associated with greater odds of conducting evidence-based suicide risk assessments at first appointments and adequacy of suicide risk management practices with patients reporting suicide ideation and a recent suicide attempt. The study utilized a cross-sectional design and self-report questionnaires. Although the majority of mental health professionals report using evidenced-based practices, there appears to be variability in utilization of evidence-based practices.

  11. Probabilistic risk assessment in nuclear power plant regulation

    Energy Technology Data Exchange (ETDEWEB)

    Wall, J B

    1980-09-01

    A specific program is recommended to utilize more effectively probabilistic risk assessment in nuclear power plant regulation. It is based upon the engineering insights from the Reactor Safety Study (WASH-1400) and some follow-on risk assessment research by USNRC. The Three Mile Island accident is briefly discussed from a risk viewpoint to illustrate a weakness in current practice. The development of a probabilistic safety goal is recommended with some suggestions on underlying principles. Some ongoing work on risk perception and the draft probabilistic safety goal being reviewed on Canada is described. Some suggestions are offered on further risk assessment research. Finally, some recent U.S. Nuclear Regulatory Commission actions are described.

  12. Innovative human health and ecological risk assessment techniques at Hanford

    International Nuclear Information System (INIS)

    Clarke, S.; Jones, K.; Goller, E.

    1993-01-01

    The open-quotes Hanford Site Baseline Risk Assessment Methodologyclose quotes (HSBRAM) was developed to enhance the preparation of risk assessments supporting the Hanford site cleanup mission. This methodology satisfies a Hanford federal facility agreement and consent order (tri-party agreement) milestone and is used to evaluate the risk to human health and the environment under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA). The methodology was prepared by the Hanford Risk Assessment Committee (RAC) consisting of tri-party representatives: the U.S. Department of Energy, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency (EPA), with associated contractors. The risk assessment guidance provided by EPA is sufficiently general to permit tailoring of specific parameters to meet the risk assessment needs of individual sites. The RAC utilized EPA's Risk Assessment Guidance for Superfund, (RAGS) as the cornerstone of the HSBRAM. The RAC added necessary Hanford-specific elements to construct a complete risk assessment guidance for utilization as an independent document. The HSBRAM is a living document because the RAC charter emphasizes the importance of continued methodology reevaluation. The HSBRAM also provides guidelines for the application of EPA's open-quotes Framework for Ecological Risk Assessmentclose quotes to Hanford-specific environmental baseline risk assessments by including endangered and threatened species in addition to sensitive habitats potentially associated with the Hanford site and guidance for selection of ecotoxicological data. Separate negotiations for the selection of risk parameters for each operable unit were avoided by defining parameters in the HSBRAM. There are 78 past-practice operable units at Hanford requiring risk assessments

  13. Excipient Usage Technical Risk Assessment for Generic Solid Dose Products

    Directory of Open Access Journals (Sweden)

    Ajay Babu Pazhayattil

    2017-09-01

    Full Text Available This paper proposes an assessment methodology for solid dose generic small molecule drug products. It addresses the ‘usage of the excipient’ portion of the trinomial by utilizing the systematic approach of Risk Identification, Risk Analysis and Risk Evaluation as per ICH Q9 Quality Risk Management outlined for developing risk control strategies. The assessment and maintenance of excipient risk profile is essential to minimize any potential risk associated to excipients impacting patients.

  14. Model based risk assessment - the CORAS framework

    Energy Technology Data Exchange (ETDEWEB)

    Gran, Bjoern Axel; Fredriksen, Rune; Thunem, Atoosa P-J.

    2004-04-15

    Traditional risk analysis and assessment is based on failure-oriented models of the system. In contrast to this, model-based risk assessment (MBRA) utilizes success-oriented models describing all intended system aspects, including functional, operational and organizational aspects of the target. The target models are then used as input sources for complementary risk analysis and assessment techniques, as well as a basis for the documentation of the assessment results. The EU-funded CORAS project developed a tool-supported methodology for the application of MBRA in security-critical systems. The methodology has been tested with successful outcome through a series of seven trial within the telemedicine and ecommerce areas. The CORAS project in general and the CORAS application of MBRA in particular have contributed positively to the visibility of model-based risk assessment and thus to the disclosure of several potentials for further exploitation of various aspects within this important research field. In that connection, the CORAS methodology's possibilities for further improvement towards utilization in more complex architectures and also in other application domains such as the nuclear field can be addressed. The latter calls for adapting the framework to address nuclear standards such as IEC 60880 and IEC 61513. For this development we recommend applying a trial driven approach within the nuclear field. The tool supported approach for combining risk analysis and system development also fits well with the HRP proposal for developing an Integrated Design Environment (IDE) providing efficient methods and tools to support control room systems design. (Author)

  15. Insights gained through probabilistic risk assessments

    International Nuclear Information System (INIS)

    Hitchler, M.J.; Burns, N.L.; Liparulo, N.J.; Mink, F.J.

    1987-01-01

    The insights gained through a comparison of seven probabilistic risk assessments (PRA) studies (Italian PUN, Sizewell B, Ringhals 2, Millstone 3, Zion 1 and 2, Oconee 3, and Seabrook) included insights regarding the adequacy of the PRA technology utilized in the studies and the potential areas for improvement and insights regarding the adequacy of plant designs and how PRA has been utilized to enhance the design and operation of nuclear power plants

  16. Challenges in Risk Assessment: Quantitative Risk Assessment

    OpenAIRE

    Jacxsens, Liesbeth; Uyttendaele, Mieke; De Meulenaer, Bruno

    2016-01-01

    The process of risk analysis consists out of three components, risk assessment, risk management and risk communication. These components are internationally well spread by Codex Alimentarius Commission as being the basis for setting science based standards, criteria on food safety hazards, e.g. setting maximum limits of mycotoxins in foodstuffs. However, the technical component risk assessment is hard to elaborate and to understand. Key in a risk assessment is the translation of biological or...

  17. Use of epidemiologic data in Integrated Risk Information System (IRIS) assessments

    International Nuclear Information System (INIS)

    Persad, Amanda S.; Cooper, Glinda S.

    2008-01-01

    In human health risk assessment, information from epidemiologic studies is typically utilized in the hazard identification step of the risk assessment paradigm. However, in the assessment of many chemicals by the Integrated Risk Information System (IRIS), epidemiologic data, both observational and experimental, have also been used in the derivation of toxicological risk estimates (i.e., reference doses [RfD], reference concentrations [RfC], oral cancer slope factors [CSF] and inhalation unit risks [IUR]). Of the 545 health assessments posted on the IRIS database as of June 2007, 44 assessments derived non-cancer or cancer risk estimates based on human data. RfD and RfC calculations were based on a spectrum of endpoints from changes in enzyme activity to specific neurological or dermal effects. There are 12 assessments with IURs based on human data, two assessments that extrapolated human inhalation data to derive CSFs and one that used human data to directly derive a CSF. Lung or respiratory cancer is the most common endpoint for cancer assessments based on human data. To date, only one chemical, benzene, has utilized human data for derivation of all three quantitative risk estimates (i.e., RfC, RfD, and dose-response modeling for cancer assessment). Through examples from the IRIS database, this paper will demonstrate how epidemiologic data have been used in IRIS assessments for both adding to the body of evidence in the hazard identification process and in the quantification of risk estimates in the dose-response component of the risk assessment paradigm

  18. Quantitative Risk Assessment of Contact Sensitization

    DEFF Research Database (Denmark)

    Api, Anne Marie; Belsito, Donald; Bickers, David

    2010-01-01

    Background: Contact hypersensitivity quantitative risk assessment (QRA) for fragrance ingredients is being used to establish new international standards for all fragrance ingredients that are potential skin sensitizers. Objective: The objective was to evaluate the retrospective clinical data...... as potential sensitizers. Methods: This article reviews clinical data for three fragrance ingredients cinnamic aldehyde, citral, and isoeugenol to assess the utility of the QRA approach for fragrance ingredients. Results: This assessment suggests that had the QRA approach been available at the time standards...

  19. Risk measures on networks and expected utility

    International Nuclear Information System (INIS)

    Cerqueti, Roy; Lupi, Claudio

    2016-01-01

    In reliability theory projects are usually evaluated in terms of their riskiness, and often decision under risk is intended as the one-shot-type binary choice of accepting or not accepting the risk. In this paper we elaborate on the concept of risk acceptance, and propose a theoretical framework based on network theory. In doing this, we deal with system reliability, where the interconnections among the random quantities involved in the decision process are explicitly taken into account. Furthermore, we explore the conditions to be satisfied for risk-acceptance criteria to be consistent with the axiomatization of standard expected utility theory within the network framework. In accordance with existing literature, we show that a risk evaluation criterion can be meaningful even if it is not consistent with the standard axiomatization of expected utility, once this is suitably reinterpreted in the light of networks. Finally, we provide some illustrative examples. - Highlights: • We discuss risk acceptance and theoretically develop this theme on the basis of network theory. • We propose an original framework for describing the algebraic structure of the set of the networks, when they are viewed as risks. • We introduce the risk measures on networks, which induce total orders on the set of networks. • We state conditions on the risk measures on networks to let the induced risk-acceptance criterion be consistent with a new formulation of the expected utility theory.

  20. Drug utilization research and risk management

    NARCIS (Netherlands)

    Mazzaglia, Giampiero; Mol, Peter G. M.; Elseviers, Monique; Wettermark, Björn; Almarsdóttir, Anna Birna; Andersen, Morten; Benko, Ria; Bennie, Marion; Eriksson, Irene; Godman, Brian; Krska, Janet; Poluzzi, Elisabetta; Taxis, Katja; Vlahovic-Palcevski, Vera; Stichele, Robert Vander

    2016-01-01

    Good risk management requires continuous evaluation and improvement of planned activities. The evaluation impact of risk management activities requires robust study designs and carefully selected outcome measures. Key learnings and caveats from drug utilization research should be applied to the

  1. Risks associated with utilization of radiation

    International Nuclear Information System (INIS)

    Matsuoka, Satoshi; Kumazawa, Shigeru; Aoki, Yoshiro; Nakamura, Yuji; Takeda, Atsuhiko; Kusama, Tomoko; Inaba, Jiro; Tanaka, Yasumasa.

    1993-01-01

    When mankind decides action, the conveniences and the risks obtained by the action are weighed up. When socially important judgement is done, the logical discussion based on objective data is indispensable. The utilization of radiation spread from industrial circles to general public, accordingly the circumstances changed from the recognition of its risks by professionals to that by general public. The radiation exposure dose of public has increased rapidly by medical treatment. The global radioactivity contamination accompanying nuclear explosion experiment and the Chernobyl accident raised the psychological risk recognition of public. Now, the fear of the potential radioactivity which may be released from nuclear power plants and nuclear fuel cycle facilities expanded. The radiation exposure due to its utilization in recent years is mostly at the level below natural radiation. The acute radiation syndrome by whole body exposure is shown, and the effect is probabilistic. The evaluation of the risks due to radiation in the early effect, the hereditary effect and the delayed effect including canceration is explained. The risks in general human activities, the concept of risks in radiation protection, the effect of Chernobyl accident and the perception of general public on radiation risks are reported. (K.I.)

  2. Environmental Risk Communication through Qualitative Risk Assessment

    Directory of Open Access Journals (Sweden)

    Sabre J. Coleman

    2014-06-01

    Full Text Available Environmental analysts are often hampered in communicating the risks of environmental contaminants due to the myriad of regulatory requirements that are applicable. The use of a qualitative, risk-based control banding strategy for assessment and control of potential environmental contaminants provides a standardized approach to improve risk communication. Presented is a model that provides an effective means for determining standardized responses and controls for common environmental issues based on the level of risk. The model is designed for integration within an occupational health and safety management system to provide a multidisciplinary environmental and occupational risk management approach. This environmental model, which utilizes multidisciplinary control banding strategies for delineating risk, complements the existing Risk Level Based Management System, a proven method in a highly regulated facility for occupational health and safety. A simplified environmental risk matrix is presented that is stratified over four risk levels. Examples of qualitative environmental control banding strategies are presented as they apply to United States regulations for construction, research activities, facility maintenance, and spill remediation that affect air, water, soil, and waste disposal. This approach offers a standardized risk communication language for multidisciplinary issues that will improve communications within and between environmental health and safety professionals, workers, and management.

  3. A Hierarchal Risk Assessment Model Using the Evidential Reasoning Rule

    Directory of Open Access Journals (Sweden)

    Xiaoxiao Ji

    2017-02-01

    Full Text Available This paper aims to develop a hierarchical risk assessment model using the newly-developed evidential reasoning (ER rule, which constitutes a generic conjunctive probabilistic reasoning process. In this paper, we first provide a brief introduction to the basics of the ER rule and emphasize the strengths for representing and aggregating uncertain information from multiple experts and sources. Further, we discuss the key steps of developing the hierarchical risk assessment framework systematically, including (1 formulation of risk assessment hierarchy; (2 representation of both qualitative and quantitative information; (3 elicitation of attribute weights and information reliabilities; (4 aggregation of assessment information using the ER rule and (5 quantification and ranking of risks using utility-based transformation. The proposed hierarchical risk assessment framework can potentially be implemented to various complex and uncertain systems. A case study on the fire/explosion risk assessment of marine vessels demonstrates the applicability of the proposed risk assessment model.

  4. Outage Risk Assessment and Management (ORAM) technology to improve outage safety and economics

    International Nuclear Information System (INIS)

    Kalra, S.P.

    2004-01-01

    The Electric Power Research Institute (EPRI) has undertaken an aggressive program, called ORAM (Outage Risk Assessment and Management), to provide utilities with tools and technology to assist in managing risk during the planning and conduct of outages. The ORAM program consists of the following 6 steps: i) Perform utility surveys and visits on shutdown risk management needs, ii) Perform probabilistic shutdown safety assessments (PSSAs) to identify generic insights that can be incorporated into risk management guidelines and identify selected areas for the development of contingency actions, iii) Develop risk management guidelines (RMG's) that provide a systematic approach to the planning and conduct of outages from a safety perspective. Incorporate insights from the shutdown safety assessments and other operating experience into the RMG's. iv) Develop selected contingency actions including a thermalhydraulic tool kit to address higher risk time periods and activities identified in the shutdown safety assessments, v) Develop computer software that integrates all of the above capability into an easy to use tool for effective shutdown operation management for utilities, vi) Provide assistance in the transfer of this technology and the application of these tools. This paper briefly describes the technical approach and tools developed under EPRI's ORAM program and its applications for improving outage safety and economics. (author)

  5. Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-06-01

    This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

  6. Risk assessment and management approaches on mental health units.

    Science.gov (United States)

    Woods, P

    2013-11-01

    This exploratory and descriptive study took place in one Canadian province. The study aimed to: (1) to identify and describe the nature and extent of current risk assessment and management approaches used in the adult inpatient mental health and forensic units; and (2) to identify good practice and shortfalls in the nature and extent of the approaches currently utilized. Data were collected from 48 participants through nine focus groups. Participants reported that they used a clinical approach to risk assessment. They had also not considered risk assessment and management as a proactive structured process. Education and training was also limited and skills were developed over time through practice. Five keys issues are discussed as important: reliance on clinical judgement alone is not the best choice to make; the need to consider risk as a whole concept; risk management being more reactive than proactive; education and training; and client involvement in risk assessment. © 2012 John Wiley & Sons Ltd.

  7. Spent Nuclear Fuel Transportation Risk Assessment Methodology for Homeland Security

    International Nuclear Information System (INIS)

    Teagarden, Grant A.; Canavan, Kenneth T.; Nickell, Robert E.

    2006-01-01

    In response to increased interest in risk-informed decision making regarding terrorism, EPRI was selected by U.S. DHS and ASME to develop and demonstrate a nuclear sector specific methodology for owner / operators to utilize in performing a Risk Analysis and Management for Critical Asset Protection (RAMCAP) assessment for the transportation of spent nuclear fuel (SNF). The objective is to characterize SNF transportation risk for risk management opportunities and to provide consistent information for DHS decision making. The method uses a characterization of risk as a function of Consequence, Vulnerability, and Threat. Worst reasonable case scenarios characterize risk for a benchmark set of threats and consequence types. A trial application was successfully performed and implementation is underway by one utility. (authors)

  8. Written Informed Consent for Computed Tomography of the Abdomen/Pelvis is Associated with Decreased CT Utilization in Low-Risk Emergency Department Patients

    Directory of Open Access Journals (Sweden)

    Lisa H. Merck

    2015-12-01

    Full Text Available Introduction: The increasing rate of patient exposure to radiation from computerized tomography (CT raises questions about appropriateness of utilization. There is no current standard to employ informed consent for CT (ICCT. Our study assessed the relationship between informed consent and CT utilization in emergency department (ED patients. Methods: An observational multiphase before-after cohort study was completed from 4/2010-5/2011. We assessed CT utilization before and after (Time I/ Time II the implementation of an informed consent protocol. Adult patients were included if they presented with symptoms of abdominal/pelvic pathology or completed ED CT. We excluded patients with pregnancy, trauma, or altered mental status. Data on history, exam, diagnostics, and disposition were collected via standard abstraction tool. We generated a multivariate logistic model via stepwise regression, to assess CT utilization across risk groups. Logistic models, stratified by risk, were generated to include study phase and a propensity score that controlled for potential confounders of CT utilization. Results: 7,684 patients met inclusion criteria. In PHASE 2, there was a 24% (95% CI [10-36%] reduction in CT utilization in the low-risk patient group (p<0.002. ICCT did not affect CT utilization in the high-risk group (p=0.16. In low-risk patients, the propensity score was significant (p<0.001. There were no adverse events reported during the study period. Conclusion: The implementation of ICCT was associated with reduced CT utilization in low-risk ED patients. ICCT has the potential to increase informed, shared decision making with patients, as well as to reduce the risks and cost associated with CT.

  9. Aggregate Exposure and Cumulative Risk Assessment--Integrating Occupational and Non-occupational Risk Factors.

    Science.gov (United States)

    Lentz, T J; Dotson, G S; Williams, P R D; Maier, A; Gadagbui, B; Pandalai, S P; Lamba, A; Hearl, F; Mumtaz, M

    2015-01-01

    Occupational exposure limits have traditionally focused on preventing morbidity and mortality arising from inhalation exposures to individual chemical stressors in the workplace. While central to occupational risk assessment, occupational exposure limits have limited application as a refined disease prevention tool because they do not account for all of the complexities of the work and non-occupational environments and are based on varying health endpoints. To be of greater utility, occupational exposure limits and other risk management tools could integrate broader consideration of risks from multiple exposure pathways and routes (aggregate risk) as well as the combined risk from exposure to both chemical and non-chemical stressors, within and beyond the workplace, including the possibility that such exposures may cause interactions or modify the toxic effects observed (cumulative risk). Although still at a rudimentary stage in many cases, a variety of methods and tools have been developed or are being used in allied risk assessment fields to incorporate such considerations in the risk assessment process. These approaches, which are collectively referred to as cumulative risk assessment, have potential to be adapted or modified for occupational scenarios and provide a tangible path forward for occupational risk assessment. Accounting for complex exposures in the workplace and the broader risks faced by the individual also requires a more complete consideration of the composite effects of occupational and non-occupational risk factors to fully assess and manage worker health problems. Barriers to integrating these different factors remain, but new and ongoing community-based and worker health-related initiatives may provide mechanisms for identifying and integrating risk from aggregate exposures and cumulative risks from all relevant sources, be they occupational or non-occupational.

  10. Estimating Bird / Aircraft Collision Probabilities and Risk Utilizing Spatial Poisson Processes

    Science.gov (United States)

    2012-06-10

    ESTIMATING BIRD/AIRCRAFT COLLISION PROBABILITIES AND RISK UTILIZING SPATIAL POISSON PROCESSES GRADUATE...AND RISK UTILIZING SPATIAL POISSON PROCESSES GRADUATE RESEARCH PAPER Presented to the Faculty Department of Operational Sciences...COLLISION PROBABILITIES AND RISK UTILIZING SPATIAL POISSON PROCESSES Brady J. Vaira, BS, MS Major, USAF Approved

  11. Implications of deregulation in natural gas industry on utility risks and returns

    Science.gov (United States)

    Addepalli, Rajendra P.

    This thesis examines the changes in risk and required return on capital for local distribution utility companies in the increasingly competitive natural gas industry. The deregulation in the industry impacts the LDCs in several ways. First, with the introduction of competition consumers have been given choices among suppliers besides the traditional monopoly, the local utility, for purchasing their natural gas supply needs. Second, with the introduction of competition, some of the interstate pipelines were stuck with 'Take Or Pay' contracts and other costs that resulted in 'stranded costs', which have been passed on to customers of the pipeline including the LDCs. Third, the new obligation for the LDCs to purchase gas from the market, as opposed to buying it from pipelines and passing on the costs to its customers, brought opportunities and risks as well. Finally, with the introduction of competition, in some states LDCs have been allowed to enter into unregulated ventures to increase their profits. In the thesis we first develop a multifactor model (MFM) to explain historical common stock returns of individual utilities and of utility portfolios. We use 'rolling regression' analysis to analyze how different variables explain the variation in stock returns over time. Second, we conduct event studies to analyze the events in the deregulation process that had significant impacts on the LDC returns. Finally we assess the changes in risk and required return on capital for the LDCs over a 15 year time frame, covering the deregulation period. We employ four aspects in the examination of risk and return profile of the utilities: measuring (a) changes in required return on common equity and Weighted Average Cost of Capital, (b) changes in risk premium (WACC less an interest rate proxy), (c) changes in utility bond ratings, and (d) changes in dividend payments, new debt and equity issuances. We perform regression analysis to explain the changes in the required WACC using

  12. Transient stability risk assessment of power systems incorporating wind farms

    DEFF Research Database (Denmark)

    Miao, Lu; Fang, Jiakun; Wen, Jinyu

    2013-01-01

    fed induction generator has been established. Wind penetration variation and multiple stochastic factors of power systems have been considered. The process of transient stability risk assessment based on the Monte Carlo method has been described and a comprehensive risk indicator has been proposed......Large-scale wind farm integration has brought several aspects of challenges to the transient stability of power systems. This paper focuses on the research of the transient stability of power systems incorporating with wind farms by utilizing risk assessment methods. The detailed model of double....... An investigation has been conducted into an improved 10-generator 39-bus system with a wind farm incorporated to verify the validity and feasibility of the risk assessment method proposed....

  13. A perspective of PC-based probabilistic risk assessment

    International Nuclear Information System (INIS)

    Sattison, M.B.; Rasmuson, D.M.; Robinson, R.C.; Russell, K.D.; Van Siclen, V.S.

    1987-01-01

    Probabilistic risk assessment (PRA) information has been under-utilized in the past due to the large effort required to input the PRA data and the large expense of the computers needed to run PRA codes. The microcomputer-based Integrated Reliability and Risk Analysis System (IRRAS) and the System Analysis and Risk Assessment (SARA) System, under development at the Idaho National Engineering Laboratory, have greatly enhanced the ability of managers to use PRA techniques in their decision-making. IRRAS is a tool that allows an analyst to create, modify, update, and reanalyze a plant PRA to keep the risk assessment current with the plant's configuration and operation. The SARA system is used to perform sensitivity studies on the results of a PRA. This type of analysis can be used to evaluate proposed changes to a plant or its operation. The success of these two software projects demonstrate that risk information can be made readily available to those that need it. This is the first step in the development of a true risk management capability

  14. Neurobiological studies of risk assessment: a comparison of expected utility and mean-variance approaches.

    Science.gov (United States)

    D'Acremont, Mathieu; Bossaerts, Peter

    2008-12-01

    When modeling valuation under uncertainty, economists generally prefer expected utility because it has an axiomatic foundation, meaning that the resulting choices will satisfy a number of rationality requirements. In expected utility theory, values are computed by multiplying probabilities of each possible state of nature by the payoff in that state and summing the results. The drawback of this approach is that all state probabilities need to be dealt with separately, which becomes extremely cumbersome when it comes to learning. Finance academics and professionals, however, prefer to value risky prospects in terms of a trade-off between expected reward and risk, where the latter is usually measured in terms of reward variance. This mean-variance approach is fast and simple and greatly facilitates learning, but it impedes assigning values to new gambles on the basis of those of known ones. To date, it is unclear whether the human brain computes values in accordance with expected utility theory or with mean-variance analysis. In this article, we discuss the theoretical and empirical arguments that favor one or the other theory. We also propose a new experimental paradigm that could determine whether the human brain follows the expected utility or the mean-variance approach. Behavioral results of implementation of the paradigm are discussed.

  15. Summary of utility/user requirements for and assessment of the MHTGR

    International Nuclear Information System (INIS)

    Mears, L.D.; Hoffman, D.P.

    1992-01-01

    Through Gas-Cooled Reactor Associates (GCRA), utilities provide end-user requirements, conduct ongoing technical and economic assessments and participate in the development of deployment strategies for the Modular High Temperature Gas-Cooled Reactor (MHTGR). It is GCRA's goal that the MHTGR be established as an attractive nuclear option for safe, reliable and economic energy supply with limited ownership risks. This report describes the rationale for the key GCRA requirements and presents a summary economic assessment of the reference, 4 module steam cycle design. (author)

  16. Coupling mode-destination accessibility with seismic risk assessment to identify at-risk communities

    International Nuclear Information System (INIS)

    Miller, Mahalia; Baker, Jack W.

    2016-01-01

    In this paper, we develop a framework for coupling mode-destination accessibility with quantitative seismic risk assessment to identify communities at high risk for travel disruptions after an earthquake. Mode-destination accessibility measures the ability of people to reach destinations they desire. We use a probabilistic seismic risk assessment procedure, including a stochastic set of earthquake events, ground-motion intensity maps, damage maps, and realizations of traffic and accessibility impacts. For a case study of the San Francisco Bay Area, we couple our seismic risk framework with a practical activity-based traffic model. As a result, we quantify accessibility risk probabilistically by community and household type. We find that accessibility varies more strongly as a function of travelers' geographic location than as a function of their income class, and we identify particularly at-risk communities. We also observe that communities more conducive to local trips by foot or bike are predicted to be less impacted by losses in accessibility. This work shows the potential to link quantitative risk assessment methodologies with high-resolution travel models used by transportation planners. Quantitative risk metrics of this type should have great utility for planners working to reduce risk to a region's infrastructure systems. - Highlights: • We couple mode-destination accessibility with probabilistic seismic risk assessment. • Results identify communities at high risk for post-earthquake travel disruptions. • Accessibility varies more as a function of home location than by income. • Our model predicts reduced accessibility risk for more walking-friendly communities.

  17. Prudence, preapproval, risk, and utility accountability

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This section discusses the inherent risk in utility compliance planning and some means of reducing this risk. The risk originates from the fact that a compliance plan is extremely complex and involves forecasting situations fifteen or twenty years into the future. Two additional uncertainties peculiar to CAAA compliance are that the increased demand for low-sulfur coal and other substitute fuels is expected to place an unanticipatable premium on them and that the price of future emissions allowances is unknown. The prudent investment test and the issue of preapproval are also discussed. 14 refs

  18. Risk assessment

    International Nuclear Information System (INIS)

    Kinchin, G.H.

    1983-01-01

    After defining risk and introducing the concept of individual and societal risk, the author considers each of these, restricting considerations to risk of death. Some probabilities of death arising from various causes are quoted, and attention drawn to the care necessary in making comparisons between sets of data and to the distinction between voluntary and involuntary categories and between early and delayed deaths. The presentation of information on societal risk is discussed and examples given. The history of quantified risk assessment is outlined, particularly related to the nuclear industry, the process of assessing risk discussed: identification of hazard causes, the development of accident chains and the use of event trees, the evaluation of probability through the collection of data and their use with fault trees, and the assessment of consequences of hazards in terms of fatalities. Reference is made to the human element and common-made failures, and to studies supporting the development of reliability assessment techniques. Acceptance criteria are discussed for individual and societal risk in the nuclear field, and it is shown that proposed criteria lead to risks conservative by comparison with risks from day-to-day accidents and other potentially hazardous industries. (U.K.)

  19. Health Risk Assessment of Harmful Chemicals: Case Study in a Petrochemical Industry

    Directory of Open Access Journals (Sweden)

    M. Motovagheh

    2011-01-01

    Full Text Available Background and aims In the most chemical process industries, workers are exposed to various chemicals and working with these chemicals without considering safety and health considerations can lead to different harmful symptoms. For deciding about control measures and reducing risk to acceptable level , it is necessary to assess the health risk of exposing to harmful chemicals by aid of specific risk assessment techniques in the process industries. The purpose of this study was to assess the health risks arising from the exposures to chemicals in a petrochemical industry.  methods A simple and applied method was used for health risk assessment of chemicals in a petrochemical industry. Firstly job tasks and work process were determined and then different chemicals in each tasks identified and risk ranking was calculated in each job task by aid of hazard and exposure rate.   Results The result showed that workers are exposed to 10 chemicals including Methyl ethyl ketone, Epichlorohydrin, Sulfuric acid, Phenol, Chlorobenzene, Toluene, Isopropanol, Methylene chloride, Chlorideric Acid and Acetone during their work in plant. From these chemicals, the highest risk level was for Epichlorohydrin in the jobs of tank and utility operations and maintenance workers. The next high risk level was for Epichlorohydrin in technical inspecting and Methyl ethyl ketone in Tank and utility operations operator.     Conclusion Hazard information and monitoring data of chemical agents in the chemical industries can be used for assessing health risks from exposures to chemicals and ranking jobs by their risk level. These data can be used for resource allocation for control measures and reducing risk level to acceptable level.    

  20. Risk Assessment Overview

    Science.gov (United States)

    Prassinos, Peter G.; Lyver, John W., IV; Bui, Chinh T.

    2011-01-01

    Risk assessment is used in many industries to identify and manage risks. Initially developed for use on aeronautical and nuclear systems, risk assessment has been applied to transportation, chemical, computer, financial, and security systems among others. It is used to gain an understanding of the weaknesses or vulnerabilities in a system so modification can be made to increase operability, efficiency, and safety and to reduce failure and down-time. Risk assessment results are primary inputs to risk-informed decision making; where risk information including uncertainty is used along with other pertinent information to assist management in the decision-making process. Therefore, to be useful, a risk assessment must be directed at specific objectives. As the world embraces the globalization of trade and manufacturing, understanding the associated risk become important to decision making. Applying risk assessment techniques to a global system of development, manufacturing, and transportation can provide insight into how the system can fail, the likelihood of system failure and the consequences of system failure. The risk assessment can identify those elements that contribute most to risk and identify measures to prevent and mitigate failures, disruptions, and damaging outcomes. In addition, risk associated with public and environment impact can be identified. The risk insights gained can be applied to making decisions concerning suitable development and manufacturing locations, supply chains, and transportation strategies. While risk assessment has been mostly applied to mechanical and electrical systems, the concepts and techniques can be applied across other systems and activities. This paper provides a basic overview of the development of a risk assessment.

  1. Subjective expected utility with non-increasing risk aversion

    NARCIS (Netherlands)

    Wakker, P.P.

    1989-01-01

    It is shown that assumptions about risk aversion, usually studied under the presupposition of expected utility maximization, have a surprising extra merit at an earlier stage of the measurement work: together with the sure-thing principle, these assumptions imply subjective expected utility

  2. Introduction to risk assessment

    International Nuclear Information System (INIS)

    Raina, V.M.

    2002-01-01

    This paper gives an introduction to risk assessment. It discusses the basic concepts of risk assessment, nuclear risk assessment process and products, the role of risk assessment products in nuclear safety assurance, the relationship between risk assessment and other safety analysis and risk assessment and safe operating envelope

  3. NNP-LANL Utilities - Condition Assessment and Project Approach

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Grant Lorenz [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-21

    This report is a presentation on LANL Utilities & Transportation Asset Management; Utility Assets Overview; Condition Assessment; Utilities Project Nominations & Ranking; and Utilities Project Execution.

  4. Cumulative Risk Assessment (CRA): transforming the way we assess health risks.

    Science.gov (United States)

    Williams, Pamela R D; Dotson, G Scott; Maier, Andrew

    2012-10-16

    Human health risk assessments continue to evolve and now focus on the need for cumulative risk assessment (CRA). CRA involves assessing the combined risk from coexposure to multiple chemical and nonchemical stressors for varying health effects. CRAs are broader in scope than traditional chemical risk assessments because they allow for a more comprehensive evaluation of the interaction between different stressors and their combined impact on human health. Future directions of CRA include greater emphasis on local-level community-based assessments; integrating environmental, occupational, community, and individual risk factors; and identifying and implementing common frameworks and risk metrics for incorporating multiple stressors.

  5. An approach to quantitative assessment of relative proliferation risks from nuclear fuel cycles

    International Nuclear Information System (INIS)

    Silvennoinen, P.; Vira, J.

    1981-01-01

    Feasibility of quantitative assessments of the risk of nuclear weapons proliferation is discussed in this paper. The proliferation risk is defined as a combined utility of the different fuel cycle processes or materials for the proscribed acquisition of a nuclear weapon. Based on a set of selected weighted criteria, the process utilities are calculated employing utility functions or fuzzy expectation values. The methods are compared to each other. The scheme appears feasible in relative comparisons while certain leeway must still be retained for political judgement. (author)

  6. Economics versus psychology.Risk, uncertainty and the expected utility theory

    OpenAIRE

    Schilirò, Daniele

    2017-01-01

    The present contribution examines the emergence of expected utility theory by John von Neumann and Oskar Morgenstern, the subjective the expected utility theory by Savage, and the problem of choice under risk and uncertainty, focusing in particular on the seminal work “The Utility Analysis of Choices involving Risk" (1948) by Milton Friedman and Leonard Savage to show how the evolution of the theory of choice has determined a separation of economics from psychology.

  7. NASA Human System Risk Assessment Process

    Science.gov (United States)

    Francisco, D.; Romero, E.

    2016-01-01

    NASA utilizes an evidence based system to perform risk assessments for the human system for spaceflight missions. The center of this process is the multi-disciplinary Human System Risk Board (HSRB). The HSRB is chartered from the Chief Health and Medical Officer (OCHMO) at NASA Headquarters. The HSRB reviews all human system risks via an established comprehensive risk and configuration management plan based on a project management approach. The HSRB facilitates the integration of human research (terrestrial and spaceflight), medical operations, occupational surveillance, systems engineering and many other disciplines in a comprehensive review of human system risks. The HSRB considers all factors that influence human risk. These factors include pre-mission considerations such as screening criteria, training, age, sex, and physiological condition. In mission factors such as available countermeasures, mission duration and location and post mission factors such as time to return to baseline (reconditioning), post mission health screening, and available treatments. All of the factors influence the total risk assessment for each human risk. The HSRB performed a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30, where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research and, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit for 6 and 12 months, deep space for 30 days and 1 year, a lunar mission for 1 year, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary

  8. Comparative Pessimism or Optimism: Depressed Mood, Risk-Taking, Social Utility and Desirability.

    Science.gov (United States)

    Milhabet, Isabelle; Le Barbenchon, Emmanuelle; Cambon, Laurent; Molina, Guylaine

    2015-03-05

    Comparative optimism can be defined as a self-serving, asymmetric judgment of the future. It is often thought to be beneficial and socially accepted, whereas comparative pessimism is correlated with depression and socially rejected. Our goal was to examine the social acceptance of comparative optimism and the social rejection of comparative pessimism in two dimensions of social judgment, social desirability and social utility, considering the attributions of dysphoria and risk-taking potential (studies 2 and 3) on outlooks on the future. In three experiments, the participants assessed either one (study 1) or several (studies 2 and 3) fictional targets in two dimensions, social utility and social desirability. Targets exhibiting comparatively optimistic or pessimistic outlooks on the future were presented as non-depressed, depressed, or neither (control condition) (study 1); non-depressed or depressed (study 2); and non-depressed or in control condition (study 3). Two significant results were obtained: (1) social rejection of comparative pessimism in the social desirability dimension, which can be explained by its depressive feature; and (2) comparative optimism was socially accepted on the social utility dimension, which can be explained by the perception that comparatively optimistic individuals are potential risk-takers.

  9. Analytical Modeling for Underground Risk Assessment in Smart Cities

    Directory of Open Access Journals (Sweden)

    Israr Ullah

    2018-06-01

    Full Text Available In the developed world, underground facilities are increasing day-by-day, as it is considered as an improved utilization of available space in smart cities. Typical facilities include underground railway lines, electricity lines, parking lots, water supply systems, sewerage network, etc. Besides its utility, these facilities also pose serious threats to citizens and property. To preempt accidental loss of precious human lives and properties, a real time monitoring system is highly desirable for conducting risk assessment on continuous basis and timely report any abnormality before its too late. In this paper, we present an analytical formulation to model system behavior for risk analysis and assessment based on various risk contributing factors. Based on proposed analytical model, we have evaluated three approximation techniques for computing final risk index: (a simple linear approximation based on multiple linear regression analysis; (b hierarchical fuzzy logic based technique in which related risk factors are combined in a tree like structure; and (c hybrid approximation approach which is a combination of (a and (b. Experimental results shows that simple linear approximation fails to accurately estimate final risk index as compared to hierarchical fuzzy logic based system which shows that the latter provides an efficient method for monitoring and forecasting critical issues in the underground facilities and may assist in maintenance efficiency as well. Estimation results based on hybrid approach fails to accurately estimate final risk index. However, hybrid scheme reveals some interesting and detailed information by performing automatic clustering based on location risk index.

  10. Utilization of artificial recharged effluent for irrigation: pollutants' removal and risk assessment

    Directory of Open Access Journals (Sweden)

    Liangliang Wei

    2017-03-01

    Full Text Available The reclaimed water from soil aquifer treatment (SAT column was reused for irrigation as the source water, pollutants' removal and health risk assessment was analyzed via the comparison with secondary and tertiary effluents. The effect of the SAT pre-treatment on the qualities and growth of different crops (Lachca sativa – lettuce, Brasica rapa var chinensis – pak choi, Cucumis sativus – cucumber, Brassica oleracea – cabbage, and Zea mays – maize were evaluated. Experimental results demonstrated that the tertiary and SAT treatments had no significant effect on the crop qualities, and could efficiently decrease the accumulation of heavy metals (especially for SAT pre-treatment. Moreover, the carcinogenic risk of the chemical carcinogens for the 1.5 m SAT effluent irrigation declined roughly an order of magnitude as compared with the secondary effluent, and three to four orders of magnitude decreasing of the virus risk. These findings are significant for the safe and cheap reuse of secondary effluent for irrigation purposes.

  11. Risk Decision Making Model for Reservoir Floodwater resources Utilization

    Science.gov (United States)

    Huang, X.

    2017-12-01

    Floodwater resources utilization(FRU) can alleviate the shortage of water resources, but there are risks. In order to safely and efficiently utilize the floodwater resources, it is necessary to study the risk of reservoir FRU. In this paper, the risk rate of exceeding the design flood water level and the risk rate of exceeding safety discharge are estimated. Based on the principle of the minimum risk and the maximum benefit of FRU, a multi-objective risk decision making model for FRU is constructed. Probability theory and mathematical statistics method is selected to calculate the risk rate; C-D production function method and emergy analysis method is selected to calculate the risk benefit; the risk loss is related to flood inundation area and unit area loss; the multi-objective decision making problem of the model is solved by the constraint method. Taking the Shilianghe reservoir in Jiangsu Province as an example, the optimal equilibrium solution of FRU of the Shilianghe reservoir is found by using the risk decision making model, and the validity and applicability of the model are verified.

  12. Expected utility and catastrophic risk in a stochastic economy-climate model

    Energy Technology Data Exchange (ETDEWEB)

    Ikefuji, M. [Institute of Social and Economic Research, Osaka University, Osaka (Japan); Laeven, R.J.A.; Magnus, J.R. [Department of Econometrics and Operations Research, Tilburg University, Tilburg (Netherlands); Muris, C. [CentER, Tilburg University, Tilburg (Netherlands)

    2010-11-15

    In the context of extreme climate change, we ask how to conduct expected utility analysis in the presence of catastrophic risks. Economists typically model decision making under risk and uncertainty by expected utility with constant relative risk aversion (power utility); statisticians typically model economic catastrophes by probability distributions with heavy tails. Unfortunately, the expected utility framework is fragile with respect to heavy-tailed distributional assumptions. We specify a stochastic economy-climate model with power utility and explicitly demonstrate this fragility. We derive necessary and sufficient compatibility conditions on the utility function to avoid fragility and solve our stochastic economy-climate model for two examples of such compatible utility functions. We further develop and implement a procedure to learn the input parameters of our model and show that the model thus specified produces quite robust optimal policies. The numerical results indicate that higher levels of uncertainty (heavier tails) lead to less abatement and consumption, and to more investment, but this effect is not unlimited.

  13. A probabilistic risk assessment of Oconee Unit 3. Executive highlights 60

    International Nuclear Information System (INIS)

    1984-04-01

    In 1980 the Nuclear Safety Analysis Center and Duke Power Co. joined in a project to provide the utility industry with a practical, useful example of the application of probabilistic risk assessment (PRA) methods. PRA is a structured analysis technique that accounts for all the failure possibilities that might conceivably lead to core damage. The technique uses probabilities as discriminators to determine which are most significant. The following were project objectives: to provide the host utility with an analytic model of the plant that describes and estimates the likelihood of failure combinations that could lead to core melt; to evaluate the risks to the plant and to the public; to improve utility capabilities in PRA methods and applications

  14. Operational risk assessment.

    Science.gov (United States)

    McKim, Vicky L

    2017-06-01

    In the world of risk management, which encompasses the business continuity disciplines, many types of risk require evaluation. Financial risk is most often the primary focus, followed by product and market risks. Another critical area, which typically lacks a thorough review or may be overlooked, is operational risk. This category encompasses many risk exposure types including those around building structures and systems, environmental issues, nature, neighbours, clients, regulatory compliance, network, data security and so on. At times, insurance carriers will assess internal hazards, but seldom do these assessments include more than a cursory look at other types of operational risk. In heavily regulated environments, risk assessments are required but may not always include thorough assessments of operational exposures. Vulnerabilities may linger or go unnoticed, only to become the catalyst for a business disruption at a later time, some of which are so severe that business recovery becomes nearly impossible. Businesses may suffer loss of clients as the result of a prolonged disruption of services. Comprehensive operational risk assessments can assist in identifying such vulnerabilities, exposures and threats so that the risk can be minimised or removed. This paper lays out how an assessment of this type can be successfully conducted.

  15. A probabilistic seismic risk assessment procedure for nuclear power plants: (II) Application

    Science.gov (United States)

    Huang, Y.-N.; Whittaker, A.S.; Luco, N.

    2011-01-01

    This paper presents the procedures and results of intensity- and time-based seismic risk assessments of a sample nuclear power plant (NPP) to demonstrate the risk-assessment methodology proposed in its companion paper. The intensity-based assessments include three sets of sensitivity studies to identify the impact of the following factors on the seismic vulnerability of the sample NPP, namely: (1) the description of fragility curves for primary and secondary components of NPPs, (2) the number of simulations of NPP response required for risk assessment, and (3) the correlation in responses between NPP components. The time-based assessment is performed as a series of intensity-based assessments. The studies illustrate the utility of the response-based fragility curves and the inclusion of the correlation in the responses of NPP components directly in the risk computation. ?? 2011 Published by Elsevier B.V.

  16. Recent case studies and advancements in probabilistic risk assessment

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1985-01-01

    During the period from 1977 to 1984, Pickard, Lowe and Garrick, Inc., had the lead in preparing several full scope probabilistic risk assessments for electric utilities. Five of those studies are discussed from the point of view of advancements and lessons learned. The objective and trend of these studies is toward utilization of the risk models by the plant owners as risk management tools. Advancements that have been made are in presentation ad documentation of the PRAs, generation of more understandable plant level information, and improvements in methodology to facilitate technology transfer. Specific areas of advancement are in the treatment of such issues as dependent failures, human interaction, and the uncertainty in the source term. Lessons learned cover a wide spectrum and include the importance of plant specific models for meaningful risk management, the role of external events in risk, the sensitivity of contributors to choice of risk index, and the very important finding that the public risk is extremely small. The future direction of PRA is to establish less dependence on experts for in-plant application. Computerizing the PRAs such that they can be accessed on line and interactively is the key

  17. Can systematic reviews inform GMO risk assessment and risk management?

    Directory of Open Access Journals (Sweden)

    Christian eKohl

    2015-08-01

    Full Text Available Systematic reviews represent powerful tools to identify, collect, synthesize and evaluate primary research data on specific research questions in a highly standardized and reproducible manner. They enable the defensible synthesis of outcomes by increasing precision and minimizing bias whilst ensuring transparency of the methods used. This makes them especially valuable to inform evidence-based risk analysis and decision making in various topics and research disciplines. Although seen as a gold standard for synthesizing primary research data, systematic reviews are not without limitations as they are often cost, labor and time intensive and the utility of synthesis outcomes depends upon the availability of sufficient and robust primary research data. In this paper we 1 consider the added value systematic reviews could provide when synthesizing primary research data on genetically modified organisms (GMO and 2 critically assess the adequacy and feasibility of systematic review for collating and analyzing data on potential impacts of GMOs in order to better inform specific steps within GMO risk assessment and risk management. The regulatory framework of the EU is used as an example, although the issues we discuss are likely to be more widely applicable.

  18. Can Systematic Reviews Inform GMO Risk Assessment and Risk Management?

    Science.gov (United States)

    Kohl, Christian; Frampton, Geoff; Sweet, Jeremy; Spök, Armin; Haddaway, Neal Robert; Wilhelm, Ralf; Unger, Stefan; Schiemann, Joachim

    2015-01-01

    Systematic reviews represent powerful tools to identify, collect, synthesize, and evaluate primary research data on specific research questions in a highly standardized and reproducible manner. They enable the defensible synthesis of outcomes by increasing precision and minimizing bias whilst ensuring transparency of the methods used. This makes them especially valuable to inform evidence-based risk analysis and decision making in various topics and research disciplines. Although seen as a "gold standard" for synthesizing primary research data, systematic reviews are not without limitations as they are often cost, labor and time intensive and the utility of synthesis outcomes depends upon the availability of sufficient and robust primary research data. In this paper, we (1) consider the added value systematic reviews could provide when synthesizing primary research data on genetically modified organisms (GMO) and (2) critically assess the adequacy and feasibility of systematic review for collating and analyzing data on potential impacts of GMOs in order to better inform specific steps within GMO risk assessment and risk management. The regulatory framework of the EU is used as an example, although the issues we discuss are likely to be more widely applicable.

  19. An approach to assessing risk in coalbed methane prospect evaluation

    International Nuclear Information System (INIS)

    Vanorsdale, C.R.

    1991-01-01

    The economic evaluation of drilling prospects requires assessing the degree of risk involved and its impact on reserve estimates. In developed areas, risk can be determined in a fairly straightforward manner. In remote wildcat areas, risk can almost never be adequately identified or quantified. Between these extremes lie complex reservoirs -- reservoirs to heterogeneous that each well drilled could exhibit production characteristics unlike those of its neighbors. This paper illustrates the use of a risk assessment methodology in a case study of Fruitland coal prospects in the San Juan Basin of New Mexico. This approach could be applied to coalbed methane prospects or any unconventional or highly heterogeneous reservoir with appropriate modification. The utility of this approach is made apparent in a graphical analysis that relates reserves, rate of return and payout time for managerial or financial presentation. This graphical technique and the underlying risk assessment were used to aid a conservative management team in evaluating participation in a multi-well coalbed project

  20. Risk Assessment for Mobile Systems Through a Multilayered Hierarchical Bayesian Network.

    Science.gov (United States)

    Li, Shancang; Tryfonas, Theo; Russell, Gordon; Andriotis, Panagiotis

    2016-08-01

    Mobile systems are facing a number of application vulnerabilities that can be combined together and utilized to penetrate systems with devastating impact. When assessing the overall security of a mobile system, it is important to assess the security risks posed by each mobile applications (apps), thus gaining a stronger understanding of any vulnerabilities present. This paper aims at developing a three-layer framework that assesses the potential risks which apps introduce within the Android mobile systems. A Bayesian risk graphical model is proposed to evaluate risk propagation in a layered risk architecture. By integrating static analysis, dynamic analysis, and behavior analysis in a hierarchical framework, the risks and their propagation through each layer are well modeled by the Bayesian risk graph, which can quantitatively analyze risks faced to both apps and mobile systems. The proposed hierarchical Bayesian risk graph model offers a novel way to investigate the security risks in mobile environment and enables users and administrators to evaluate the potential risks. This strategy allows to strengthen both app security as well as the security of the entire system.

  1. A note on additive risk measures in rank-dependent utility

    NARCIS (Netherlands)

    Goovaerts, M.J.; Kaas, R.; Laeven, R.J.A.

    2010-01-01

    This note proves that risk measures obtained by applying the equivalent utility principle in rank-dependent utility are additive if and only if the utility function is linear or exponential and the probability weighting (distortion) function is the identity.

  2. Hepatitis Risk Assessment

    Science.gov (United States)

    ... please visit this page: About CDC.gov . Hepatitis Risk Assessment Recommend on Facebook Tweet Share Compartir Viral Hepatitis. Are you at risk? Take this 5 minute Hepatitis Risk Assessment developed ...

  3. Managing carbon regulatory risk in utility resource planning: Current practices in the Western United States

    International Nuclear Information System (INIS)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-01-01

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by 15 electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without federal climate regulation in the US, the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of US electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  4. Validity of various epidemiological approaches to assessing radon health risk

    International Nuclear Information System (INIS)

    Conrath, S.M.

    1990-01-01

    In this paper various epidemiologic study designs are defined and evaluated for their utility in assessing radon health risk. The strengths and limitations of these approaches are addressed. Common pitfalls and errors of epidemiologic method are delineated with examples of causes and remedies

  5. Appraising longitudinal trends in the strategic risks cited by risk managers in the international water utility sector, 2005-2015.

    Science.gov (United States)

    Chalker, Rosemary T C; Pollard, Simon J T; Leinster, Paul; Jude, Simon

    2018-03-15

    We report dynamic changes in the priorities for strategic risks faced by international water utilities over a 10year period, as cited by managers responsible for managing them. A content analysis of interviews with three cohorts of risk managers in the water sector was undertaken. Interviews probed the focus risk managers' were giving to strategic risks within utilities, as well as specific questions on risk analysis tools (2005); risk management cultures (2011) and the integration of risk management with corporate decision-making (2015). The coding frequency of strategic (business, enterprise, corporate) risk terms from 18 structured interviews (2005) and 28 semi-structured interviews (12 in 2011; 16 in 2015) was used to appraise changes in the perceived importance of strategic risks within the sector. The aggregated coding frequency across the study period, and changes in the frequency of strategic risks cited at three interview periods identified infrastructure assets as the most significant risk over the period and suggests an emergence of extrinsic risk over time. Extended interviews with three utility risk managers (2016) from the UK, Canada and the US were then used to contextualise the findings. This research supports the ongoing focus on infrastructure resilience and the increasing prevalence of extrinsic risk within the water sector, as reported by the insurance sector and by water research organisations. The extended interviews provided insight into how strategic risks are now driving the implementation agenda within utilities, and into how utilities can secure tangible business value from proactive risk governance. Strategic external risks affecting the sector are on the rise, involve more players and are less controllable from within a utility's own organisational boundaries. Proportionate risk management processes and structures provide oversight and assurance, whilst allowing a focus on the tangible business value that comes from managing strategic

  6. Pilot research project of risk communication on nuclear technology and its utilization. Toward communication and collaboration with community

    International Nuclear Information System (INIS)

    Tsuchiya, Tomoko

    2003-01-01

    Although the importance of risk communication has been pointed out over the last decade in nuclear community, both public authorities and nuclear industry have not conducted the definite actions yet. It will be reflected in the public eye that nuclear community's attitude toward communication and consultation with the public about risk issues is half-hearted, comparing with chemical and food safety fields which recently launched their risk communication activities. In this study, we conduct risk communication experiments on some risk issues associated with nuclear technology and its utilization in Tokai village, for the purpose of establishment of risk communication in our society that might be one of the new relationships between science and technology and society. The outcomes of FY2002 study are the following threefold; 1) preparation of risk communication experiments on nuclear technology and its utilization, 2) assessment of social effects of risk communication activities, 3) preparation of practical guidebook for risk communication experiments. (J.P.N.)

  7. An approach for integrating toxicogenomic data in risk assessment: The dibutyl phthalate case study

    Energy Technology Data Exchange (ETDEWEB)

    Euling, Susan Y., E-mail: euling.susan@epa.gov [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, Washington, DC (United States); Thompson, Chad M. [ToxStrategies, Inc., 23501 Cinco Ranch Blvd., Suite G265, Katy, TX 77494 (United States); Chiu, Weihsueh A. [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, Washington, DC (United States); Benson, Robert [U.S. Environmental Protection Agency, Region 8, Mail code 8P-W, 1595 Wynkoop Street, Denver, CO 80202 (United States)

    2013-09-15

    An approach for evaluating and integrating genomic data in chemical risk assessment was developed based on the lessons learned from performing a case study for the chemical dibutyl phthalate. A case study prototype approach was first developed in accordance with EPA guidance and recommendations of the scientific community. Dibutyl phthalate (DBP) was selected for the case study exercise. The scoping phase of the dibutyl phthalate case study was conducted by considering the available DBP genomic data, taken together with the entire data set, for whether they could inform various risk assessment aspects, such as toxicodynamics, toxicokinetics, and dose–response. A description of weighing the available dibutyl phthalate data set for utility in risk assessment provides an example for considering genomic data for future chemical assessments. As a result of conducting the scoping process, two questions—Do the DBP toxicogenomic data inform 1) the mechanisms or modes of action?, and 2) the interspecies differences in toxicodynamics?—were selected to focus the case study exercise. Principles of the general approach include considering the genomics data in conjunction with all other data to determine their ability to inform the various qualitative and/or quantitative aspects of risk assessment, and evaluating the relationship between the available genomic and toxicity outcome data with respect to study comparability and phenotypic anchoring. Based on experience from the DBP case study, recommendations and a general approach for integrating genomic data in chemical assessment were developed to advance the broader effort to utilize 21st century data in risk assessment. - Highlights: • Performed DBP case study for integrating genomic data in risk assessment • Present approach for considering genomic data in chemical risk assessment • Present recommendations for use of genomic data in chemical risk assessment.

  8. Assessment of sulfide production risk in soil during the infiltration of domestic wastewater treated by a sulfur-utilizing denitrification process.

    Science.gov (United States)

    Ghorbel, L; Coudert, L; Gilbert, Y; Mercier, G; Blais, J F

    2016-10-01

    This study aimed to determine the potential of sulfide generation during infiltration through soil of domestic wastewater treated by a sulfur-utilizing denitrification process. Three types of soil with different permeability rates (K s = 0.028, 0.0013, and 0.00015 cm/s) were investigated to evaluate the potential risk of sulfur generation during the infiltration of domestic wastewater treated by a sulfur-utilizing denitrification system. These soils were thoroughly characterized and tested to assess their capacity to be used as drainages for wastewaters. Experiments were conducted under two operating modes (saturated and unsaturated). Sulfate, sulfide, and chemical oxygen demand (COD) levels were determined over a period of 100 days. Despite the high concentration of sulfates (200 mg/L) under anaerobic conditions (ORP = -297 mV), no significant amount of sulfide was generated in the aqueous (soil permeability did not have a noticeable effect on the infiltration of domestic wastewater treated by a sulfur-utilizing denitrification system due to low contents of organic matter (i.e., dissolved organic carbon, DOC). The autotrophic denitrification process used to treat the domestic wastewater allowed the reduction of the concentration of biochemical oxygen demand (BOD5) below 5 mg/L, of DOC below 7 mg/L, and of COD below 100 mg/L.

  9. GM Risk Assessment

    Science.gov (United States)

    Sparrow, Penny A. C.

    GM risk assessments play an important role in the decision-making process surrounding the regulation, notification and permission to handle Genetically Modified Organisms (GMOs). Ultimately the role of a GM risk assessment will be to ensure the safe handling and containment of the GMO; and to assess any potential impacts on the environment and human health. A risk assessment should answer all ‘what if’ scenarios, based on scientific evidence.

  10. Novel sensing technology in fall risk assessment in older adults: a systematic review.

    Science.gov (United States)

    Sun, Ruopeng; Sosnoff, Jacob J

    2018-01-16

    Falls are a major health problem for older adults with significant physical and psychological consequences. A first step of successful fall prevention is to identify those at risk of falling. Recent advancement in sensing technology offers the possibility of objective, low-cost and easy-to-implement fall risk assessment. The objective of this systematic review is to assess the current state of sensing technology on providing objective fall risk assessment in older adults. A systematic review was conducted in accordance to the Preferred Reporting Items for Systematic Reviews and Meta-Analysis statement (PRISMA). Twenty-two studies out of 855 articles were systematically identified and included in this review. Pertinent methodological features (sensing technique, assessment activities, outcome variables, and fall discrimination/prediction models) were extracted from each article. Four major sensing technologies (inertial sensors, video/depth camera, pressure sensing platform and laser sensing) were reported to provide accurate fall risk diagnostic in older adults. Steady state walking, static/dynamic balance, and functional mobility were used as the assessment activity. A diverse range of diagnostic accuracy across studies (47.9% - 100%) were reported, due to variation in measured kinematic/kinetic parameters and modelling techniques. A wide range of sensor technologies have been utilized in fall risk assessment in older adults. Overall, these devices have the potential to provide an accurate, inexpensive, and easy-to-implement fall risk assessment. However, the variation in measured parameters, assessment tools, sensor sites, movement tasks, and modelling techniques, precludes a firm conclusion on their ability to predict future falls. Future work is needed to determine a clinical meaningful and easy to interpret fall risk diagnosis utilizing sensing technology. Additionally, the gap between functional evaluation and user experience to technology should be addressed.

  11. Risk assessment of nanomaterials and nanoproducts – adaptation of traditional approaches

    International Nuclear Information System (INIS)

    Jahnel, J; Fleischer, T; Seitz, S B

    2013-01-01

    Different approaches have been adopted for assessing the potential risks of conventional chemicals and products for human health. In general, the traditional paradigm is a toxicological-driven chemical-by-chemical approach, focusing on single toxic endpoints. Scope and responsibilities for the development and implementation of a risk assessment concept vary across sectors and areas and depends on the specific regulatory environment and the specific protection goals. Thus, risk assessment implication is a complex task based not only on science based knowledge but also on the regulatory context involving different parties and stakeholders. Questions have been raised whether standard paradigms for conventional chemicals would be applicable and adequate for new materials, products and applications of nanotechnology. Most scientists and stakeholders assume that current standard methods are in principle applicable to nanomaterials, but specific aspects require further development. The paper presents additional technical improvements like the complementary use of the life cycle methodology and the support of risk-based classification systems. But also aspects improving the utility of risk assessment with regard to societal impacts on risk governance are discussed.

  12. Electric-utility returns and risk in the light of Three Mile Island

    International Nuclear Information System (INIS)

    Brooks, L.D.; D'Souza, R.E.

    1982-01-01

    The impact of the Three Mile Island nuclear-generating-unit failure on the performance of nuclear-dependent electric utilities is examined in this article. A comparative examination of the time series of abnormal returns and risk measures on nuclear-dependent utilities and nondependent utilities prior to the TMI incident, at the time of the incident, and subsequent to it was performed by the authors. The results are consistent with a hypothesis that investors associate a decline in future profitability or increased risk with nuclear-associated utilities. However, the more-objective measures indicate a clear reduction in risk for nuclear-associated utilities since the TMI incident, both in relation to the market as a whole and in relation to electric utilities which are not nuclear-associated. 4 references, 1 figure, 3 tables

  13. A risk assessment of the SAFR plant

    International Nuclear Information System (INIS)

    Rutherford, P.D.; Mills, J.C.; Lancet, R.T.; Nourjah, P.

    1987-01-01

    The Sodium Advanced Fast Reactor (SAFR) is a modular, advanced concept, Liquid Metal Reactor (LMR), funded by the U.S., and designed by Rockwell International, Bechtel Corporation, and Combustion Engineering. SAFR utilizes the inherently safe features of small fast reactors, including natural convection decay heat removal systems, a self-actuated shutdown system (SASS) and inherent core response to design basis events without scram including transient overpower (TOP), loss of flow (LOF), and loss of heat sink (LOHS) events. A Level 3 probabilistic risk assessment (PRA) has been performed which demonstrates considerable reduction in plant and public risk compared to current commercial reactors. (orig./HSCH)

  14. Assessing Somatosensory Utilization during Unipedal Postural Control

    OpenAIRE

    Goel, Rahul; De Dios, Yiri E.; Gadd, Nichole E.; Caldwell, Erin E.; Peters, Brian T.; Reschke, Millard F.; Bloomberg, Jacob J.; Oddsson, Lars I. E.; Mulavara, Ajitkumar P.

    2017-01-01

    Multisensory—visual, vestibular and somatosensory information is integrated for appropriate postural control. The primary goal of this study was to assess somatosensory utilization during a functional motor task of unipedal postural control, in normal healthy adults. Assessing individual bias in the utilization of individual sensory contributions during postural control may help customization of rehabilitation protocols. In this study, a test paradigm of unipedal stance control in supine orie...

  15. Real-time web-based assessment of total population risk of future emergency department utilization: statewide prospective active case finding study.

    Science.gov (United States)

    Hu, Zhongkai; Jin, Bo; Shin, Andrew Y; Zhu, Chunqing; Zhao, Yifan; Hao, Shiying; Zheng, Le; Fu, Changlin; Wen, Qiaojun; Ji, Jun; Li, Zhen; Wang, Yong; Zheng, Xiaolin; Dai, Dorothy; Culver, Devore S; Alfreds, Shaun T; Rogow, Todd; Stearns, Frank; Sylvester, Karl G; Widen, Eric; Ling, Xuefeng B

    2015-01-13

    An easily accessible real-time Web-based utility to assess patient risks of future emergency department (ED) visits can help the health care provider guide the allocation of resources to better manage higher-risk patient populations and thereby reduce unnecessary use of EDs. Our main objective was to develop a Health Information Exchange-based, next 6-month ED risk surveillance system in the state of Maine. Data on electronic medical record (EMR) encounters integrated by HealthInfoNet (HIN), Maine's Health Information Exchange, were used to develop the Web-based surveillance system for a population ED future 6-month risk prediction. To model, a retrospective cohort of 829,641 patients with comprehensive clinical histories from January 1 to December 31, 2012 was used for training and then tested with a prospective cohort of 875,979 patients from July 1, 2012, to June 30, 2013. The multivariate statistical analysis identified 101 variables predictive of future defined 6-month risk of ED visit: 4 age groups, history of 8 different encounter types, history of 17 primary and 8 secondary diagnoses, 8 specific chronic diseases, 28 laboratory test results, history of 3 radiographic tests, and history of 25 outpatient prescription medications. The c-statistics for the retrospective and prospective cohorts were 0.739 and 0.732 respectively. Integration of our method into the HIN secure statewide data system in real time prospectively validated its performance. Cluster analysis in both the retrospective and prospective analyses revealed discrete subpopulations of high-risk patients, grouped around multiple "anchoring" demographics and chronic conditions. With the Web-based population risk-monitoring enterprise dashboards, the effectiveness of the active case finding algorithm has been validated by clinicians and caregivers in Maine. The active case finding model and associated real-time Web-based app were designed to track the evolving nature of total population risk, in a

  16. Offshore risk assessment

    CERN Document Server

    Vinnem, Jan-Erik

    2014-01-01

      Offshore Risk Assessment was the first book to deal with quantified risk assessment (QRA) as applied specifically to offshore installations and operations. Risk assessment techniques have been used for more than three decades in the offshore oil and gas industry, and their use is set to expand increasingly as the industry moves into new areas and faces new challenges in older regions.   This updated and expanded third edition has been informed by a major R&D program on offshore risk assessment in Norway and summarizes research from 2006 to the present day. Rooted with a thorough discussion of risk metrics and risk analysis methodology,  subsequent chapters are devoted to analytical approaches to escalation, escape, evacuation and rescue analysis of safety and emergency systems.   Separate chapters analyze the main hazards of offshore structures: fire, explosion, collision, and falling objects as well as structural and marine hazards. Risk mitigation and control are discussed, as well as an illustrat...

  17. The Utility of Risk Assessment Instruments for the Prediction of Recidivism in Sexual Homicide Perpetrators

    Science.gov (United States)

    Hill, Andreas; Rettenberger, Martin; Habermann, Niels; Berner, Wolfgang; Eher, Reinhard; Briken, Peer

    2012-01-01

    To examine the predictive accuracy of four well established risk assessment instruments (PCL-R, HCR-20, SVR-20, and Static-99) in an important subgroup of sexual offenders, these instruments were assessed retrospectively based on information from forensic psychiatric court reports in a sample of 90 released male sexual homicide offenders (out of…

  18. Variations of emission characterization of PAHs emitted from different utility boilers of coal-fired power plants and risk assessment related to atmospheric PAHs.

    Science.gov (United States)

    Wang, Ruwei; Liu, Guijian; Zhang, Jiamei

    2015-12-15

    Coal-fired power plants (CFPPs) represent important source of atmospheric PAHs, however, their emission characterization are still largely unknown. In this work, the concentration, distribution and gas-particle partitioning of PM10- and gas-phase PAHs in flue gas emitted from different coal-fired utility boilers were investigated. Moreover, concentration and distribution in airborne PAHs from different functional areas of power plants were studied. People's inhalatory and dermal exposures to airborne PAHs at these sites were estimated and their resultant lung cancer and skin cancer risks were assessed. Results indicated that the boiler capacity and operation conditions have significant effect on PAH concentrations in both PM10 and gas phases due to the variation of combustion efficiency, whereas they take neglected effect on PAH distributions. The wet flue gas desulphurization (WFGD) takes significant effect on the scavenging of PAH in both PM10 and gas phases, higher scavenging efficiency were found for less volatile PAHs. PAH partitioning is dominated by absorption into organic matter and accompanied by adsorption onto PM10 surface. In addition, different partitioning mechanism is observed for individual PAHs, which is assumed arising from their chemical affinity and vapor pressure. Risk assessment indicates that both inhalation and dermal contact greatly contribute to the cancer risk for CFPP workers and nearby residents. People working in workshop are exposed to greater inhalation and dermal exposure risk than people living in nearby vicinity and working office. Copyright © 2015. Published by Elsevier B.V.

  19. Utilizing relative potency factors (RPF) and threshold of toxicological concern (TTC) concepts to assess hazard and human risk assessment profiles of environmental metabolites: a case study.

    Science.gov (United States)

    Terry, C; Rasoulpour, R J; Knowles, S; Billington, R

    2015-03-01

    , X11719474 found in soil, crops and, potentially, at low concentrations, in groundwater, was the most extensively studied, with genetic, acute, short-term rat and dog, rodent reproductive and developmental toxicity studies, and MoA studies conducted. These data supported that the toxicity profile for X11719474 was limited to liver effects via the same MoA as the parent and, overall, X11719474 was significantly less toxic than parent. Subsequently, the comparative toxicology programme was extended to cover all metabolites of sulfoxaflor. Based on structure (i.e., similarity of metabolite structures to one another), toxic effects in comparison with parent (i.e., consistency of the toxicity profiles and confidence in terms of ability to read across), residue compartment (e.g., crop, soil, water) and predicted level of exposure, fewer studies were required for establishing safety of these metabolites compared to X11719474. For example, for some metabolites with very low predicted environmental concentrations only genotoxicity testing was required. For some metabolites with low predicted concentrations, for example only present in liver, a TTC approach was utilized. This strategy of comparative assessment utilizing MoA data, relative potency, hazard characterization, read-across, predicted exposure and TTC provided a robust database, which minimized animal use, comprehensively assessed the hazard and human risk presented by these metabolites. Copyright © 2015 Elsevier Inc. All rights reserved.

  20. Psychosocial assessments for young people: a systematic review examining acceptability, disclosure and engagement, and predictive utility

    Directory of Open Access Journals (Sweden)

    Bradford S

    2012-12-01

    Full Text Available Sally Bradford,1 Debra Rickwood1,21Faculty of Health, University of Canberra, Canberra, 2Headspace National Youth Mental Health Foundation, North Melbourne, AustraliaAbstract: Adolescence and young adulthood are often turbulent periods in a person’s life. There are high rates of accidental deaths, suicide, mental health concerns, substance use, and sexual experimentation. Health care professionals need to conduct holistic assessments of clients in these developmental life stages to identify psychosocial risks and provide targeted early intervention and implement prevention strategies. The most useful psychosocial assessments for most health care professionals are those that can provide a complete picture of the young person’s life and circumstances. This article identifies psychosocial assessment instruments that can be used as an initial assessment and engagement tool with the general population of young people presenting for health care. We review the psychometric properties of each of the instruments, determining what type of instrument is most acceptable to young people, whether any can increase disclosure and improve engagement between young people and health professionals, and whether they have predictive utility. The search strategy complied with the relevant sections of the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA statement. A total of 89 published articles were identified, covering 31 different assessment instruments. Results indicated that those that were self-administered were most acceptable to young people, although it is unclear whether pen-and-paper or computer formats were preferred. Most psychosocial assessments can improve rates of disclosure and enhance engagement between young people and health professionals; however, worryingly, we found evidence that clinicians did not always respond to some of the most serious identified risks. Only for one instrument was there any mention of

  1. BIOLOGICAL RESPONSES OF THE SEA URCHIN, ARBACIA PUNTULATA, TO LEAD CONTAMINATION FOR AN ESTUARINE ECOLOGICAL RISK ASSESSMENT

    Science.gov (United States)

    An estuarine ecological risk assessment for the Portsmouth Naval Shipyard (PNS) Kittery, ME, was conducted utilizing the U.S. EPA's Framework for Ecological Risk Assessment (ERA). As part of the analysis phase of the ERA, laboratory studies were conducted to develop quantitative ...

  2. A prospective, longitudinal study to evaluate the clinical utility of a predictive algorithm that detects risk of opioid use disorder

    Science.gov (United States)

    Brenton, Ashley; Lee, Chee; Lewis, Katrina; Sharma, Maneesh; Kantorovich, Svetlana; Smith, Gregory A; Meshkin, Brian

    2018-01-01

    Purpose The purpose of this study was to determine the clinical utility of an algorithm-based decision tool designed to assess risk associated with opioid use. Specifically, we sought to assess how physicians were using the profile in patient care and how its use affected patient outcomes. Patients and methods A prospective, longitudinal study was conducted to assess the utility of precision medicine testing in 5,397 patients across 100 clinics in the USA. Using a patent-protected, validated algorithm combining specific genetic risk factors with phenotypic traits, patients were categorized into low-, moderate-, and high-risk patients for opioid abuse. Physicians who ordered precision medicine testing were asked to complete patient evaluations and document their actions, decisions, and perceptions regarding the utility of the precision medicine tests. The patient outcomes associated with each treatment action were carefully documented. Results Physicians used the profile to guide treatment decisions for over half of the patients. Of those, guided treatment decisions for 24.5% of the patients were opioid related, including changing the opioid prescribed, starting an opioid, or titrating a patient off the opioid. Treatment guidance was strongly influenced by profile-predicted opioid use disorder (OUD) risk. Most importantly, patients whose physicians used the profile to guide opioid-related treatment decisions had improved clinical outcomes, including better pain management by medication adjustments, with an average pain decrease of 3.4 points on a scale of 1–10. Conclusion Patients whose physicians used the profile to guide opioid-related treatment decisions had improved clinical outcomes, as measured by decreased pain levels resulting from better pain management with prescribed medications. The clinical utility of the profile is twofold. It provides clinically actionable recommendations that can be used to 1) prevent OUD through limiting initial opioid

  3. Dutch Risk Assessment tools

    NARCIS (Netherlands)

    Venema, A.

    2015-01-01

    The ‘Risico- Inventarisatie- en Evaluatie-instrumenten’ is the name for the Dutch risk assessment (RA) tools. A RA tool can be used to perform a risk assessment including an evaluation of the identified risks. These tools were among the first online risk assessment tools developed in Europe. The

  4. Quantitative Adverse Outcome Pathways and their Utility to Ecological Risk Assessments of Endangered Species

    Science.gov (United States)

    Ecological risk assessments of endangered species are often hampered by a lack of knowledge about the sensitivity of endangered species to chemicals of concern. However, traditional in vivo toxicity testing of endangered species is often not possible for practical and ethical rea...

  5. Engineering measures and risk assessment against fault displacement

    International Nuclear Information System (INIS)

    Narabayashi, Tadashi; Okamoto, Koji; Dodo, Takashi; Kamiya, Masanobu

    2017-01-01

    A special committee on 'assessment on fault activities and engineering risk' was established at the Japan Atomic Energy Society. With a participation of the Japan Society of Maintenology, a study group on nuclear safety regulations was established at the Japan Society of Maintenology, and this theme has been examined. Among the technics for evaluating the effects of fault displacement on nuclear facilities, the concept of application of the safety margin evaluation method is shown. By applying this method, it is possible to evaluate nuclear safety against fault displacement, and it is also possible to obtain risk information such as the conditions of facilities and safety functions (retention or loss) as well as the safety margin against core damage, including the event exceeding prediction. Thus, it is possible to verify the effectiveness of accident management and to make decisions for further countermeasures to reduce risk through using the obtained risk information. The countermeasures prepared for large scale damage can also be effectively utilized. It is necessary not only the fault displacement targeted in this paper, but also the results of risk assessment obtained by safety margin assessment etc. are reflected on the improvement of accident management at the site, education and training, and assumption of various events and desk training, and are linked to safety improvement. Efforts for encouraging these actions are also required. (A.O.)

  6. A 21st century roadmap for human health risk assessment.

    Science.gov (United States)

    Pastoor, Timothy P; Bachman, Ammie N; Bell, David R; Cohen, Samuel M; Dellarco, Michael; Dewhurst, Ian C; Doe, John E; Doerrer, Nancy G; Embry, Michelle R; Hines, Ronald N; Moretto, Angelo; Phillips, Richard D; Rowlands, J Craig; Tanir, Jennifer Y; Wolf, Douglas C; Boobis, Alan R

    2014-08-01

    The Health and Environmental Sciences Institute (HESI)-coordinated Risk Assessment in the 21st Century (RISK21) project was initiated to develop a scientific, transparent, and efficient approach to the evolving world of human health risk assessment, and involved over 120 participants from 12 countries, 15 government institutions, 20 universities, 2 non-governmental organizations, and 12 corporations. This paper provides a brief overview of the tiered RISK21 framework called the roadmap and risk visualization matrix, and articulates the core principles derived by RISK21 participants that guided its development. Subsequent papers describe the roadmap and matrix in greater detail. RISK21 principles include focusing on problem formulation, utilizing existing information, starting with exposure assessment (rather than toxicity), and using a tiered process for data development. Bringing estimates of exposure and toxicity together on a two-dimensional matrix provides a clear rendition of human safety and risk. The value of the roadmap is its capacity to chronicle the stepwise acquisition of scientific information and display it in a clear and concise fashion. Furthermore, the tiered approach and transparent display of information will contribute to greater efficiencies by calling for data only as needed (enough precision to make a decision), thus conserving animals and other resources.

  7. Multicriteria Decision Framework for Cybersecurity Risk Assessment and Management.

    Science.gov (United States)

    Ganin, Alexander A; Quach, Phuoc; Panwar, Mahesh; Collier, Zachary A; Keisler, Jeffrey M; Marchese, Dayton; Linkov, Igor

    2017-09-05

    Risk assessors and managers face many difficult challenges related to novel cyber systems. Among these challenges are the constantly changing nature of cyber systems caused by technical advances, their distribution across the physical, information, and sociocognitive domains, and the complex network structures often including thousands of nodes. Here, we review probabilistic and risk-based decision-making techniques applied to cyber systems and conclude that existing approaches typically do not address all components of the risk assessment triplet (threat, vulnerability, consequence) and lack the ability to integrate across multiple domains of cyber systems to provide guidance for enhancing cybersecurity. We present a decision-analysis-based approach that quantifies threat, vulnerability, and consequences through a set of criteria designed to assess the overall utility of cybersecurity management alternatives. The proposed framework bridges the gap between risk assessment and risk management, allowing an analyst to ensure a structured and transparent process of selecting risk management alternatives. The use of this technique is illustrated for a hypothetical, but realistic, case study exemplifying the process of evaluating and ranking five cybersecurity enhancement strategies. The approach presented does not necessarily eliminate biases and subjectivity necessary for selecting countermeasures, but provides justifiable methods for selecting risk management actions consistent with stakeholder and decisionmaker values and technical data. Published 2017. This article is a U.S. Government work and is in the public domain in the U.S.A.

  8. Probabilistic earthquake risk assessment as a tool to improve safety and explanatory adequacy

    International Nuclear Information System (INIS)

    Itoi, Tatsuya

    2015-01-01

    This paper explains the concept of probabilistic earthquake risk assessment, mainly from the viewpoint as a tool to improve safety and explanatory adequacy. The definition of risk is the expected value of undesirable effect in an engineering meaning that is likely to occur in the future, and it is defined in risk management as the triplet of scenario (what can happen), frequency, and impact. As for the earthquake risk assessment of a nuclear power plant, the fragility of structure / system / component (SSC) against earthquake (so-called earthquake fragility) is assessed, and by combining with the earthquake hazard that has been separately obtained, the occurrence frequency and impact of the accident are obtained. From the view of the authors, earthquake risk assessment is for the purpose of decision-making, and is not intended to calculate the probability in a scientifically rigorous manner. For ensuring the quality of risk assessment, the table of 'Expert utilization standards for the evaluation of epistemological uncertainty' is used. Sole quantitative risk assessment is not necessarily sufficient for risk management. It would be important to find how to build the 'framework for comprehensive decision-making.' (A.O.)

  9. Risk assessment and risk management of mycotoxins.

    Science.gov (United States)

    2012-01-01

    Risk assessment is the process of quantifying the magnitude and exposure, or probability, of a harmful effect to individuals or populations from certain agents or activities. Here, we summarize the four steps of risk assessment: hazard identification, dose-response assessment, exposure assessment, and risk characterization. Risk assessments using these principles have been conducted on the major mycotoxins (aflatoxins, fumonisins, ochratoxin A, deoxynivalenol, and zearalenone) by various regulatory agencies for the purpose of setting food safety guidelines. We critically evaluate the impact of these risk assessment parameters on the estimated global burden of the associated diseases as well as the impact of regulatory measures on food supply and international trade. Apart from the well-established risk posed by aflatoxins, many uncertainties still exist about risk assessments for the other major mycotoxins, often reflecting a lack of epidemiological data. Differences exist in the risk management strategies and in the ways different governments impose regulations and technologies to reduce levels of mycotoxins in the food-chain. Regulatory measures have very little impact on remote rural and subsistence farming communities in developing countries, in contrast to developed countries, where regulations are strictly enforced to reduce and/or remove mycotoxin contamination. However, in the absence of the relevant technologies or the necessary infrastructure, we highlight simple intervention practices to reduce mycotoxin contamination in the field and/or prevent mycotoxin formation during storage.

  10. Biosafety Risk Assessment Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Caskey, Susan Adele [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Gaudioso, Jennifer M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Salerno, Reynolds Mathewson [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Wagner, Stefan M. [Public Health Agency of Canada, Winnipeg, MB (Canada). Canadian Science Centre for Human and Animal Health (CSCHAH); Shigematsu, Mika [National Inst. of Infectious Diseases (NIID), Tokyo (Japan); Risi, George [Infectious Disease Specialists, P.C, Missoula, MT (United States); Kozlovac, Joe [US Dept. of Agriculture (USDA)., Beltsville, MD (United States); Halkjaer-Knudsen, Vibeke [Statens Serum Inst., Copenhagen (Denmark); Prat, Esmeralda [Bayer CropScience, Monheim am Rhein (Germany)

    2010-10-01

    Laboratories that work with biological agents need to manage their safety risks to persons working the laboratories and the human and animal community in the surrounding areas. Biosafety guidance defines a wide variety of biosafety risk mitigation measures, which include measures which fall under the following categories: engineering controls, procedural and administrative controls, and the use of personal protective equipment; the determination of which mitigation measures should be used to address the specific laboratory risks are dependent upon a risk assessment. Ideally, a risk assessment should be conducted in a manner which is standardized and systematic which allows it to be repeatable and comparable. A risk assessment should clearly define the risk being assessed and avoid over complication.

  11. Validity of the AUDIT-C screen for at-risk drinking among students utilizing university primary care.

    Science.gov (United States)

    Campbell, Clare E; Maisto, Stephen A

    2018-03-22

    Research is needed to establish the psychometric properties of brief screens in university primary care settings. This study aimed to assess the construct validity of one such screen, the Alcohol Use Disorders Identification Test-Consumption (AUDIT-C), for detecting at-risk drinking among students who have utilized on-campus primary care. 389 students recently seen in university primary care completed a confidential online survey in December 2014. Bivariate correlations between the AUDIT-C and measures of alcohol consumption and negative drinking consequences provided concurrent evidence for construct validity. Receiver Operating Characteristic curve analyses determined optimal cut-off scores for at-risk drinking. The AUDIT-C significantly correlated with measures of alcohol consumption and negative drinking consequences (p AUDIT-C cut-off scores of 5 for females and 7 for males. The AUDIT-C is a valid screen for at-risk drinking among students who utilize university primary care.

  12. Assessing ergonomic risks of software: Development of the SEAT.

    Science.gov (United States)

    Peres, S Camille; Mehta, Ranjana K; Ritchey, Paul

    2017-03-01

    Software utilizing interaction designs that require extensive dragging or clicking of icons may increase users' risks for upper extremity cumulative trauma disorders. The purpose of this research is to develop a Self-report Ergonomic Assessment Tool (SEAT) for assessing the risks of software interaction designs and facilitate mitigation of those risks. A 28-item self-report measure was developed by combining and modifying items from existing industrial ergonomic tools. Data were collected from 166 participants after they completed four different tasks that varied by method of input (touch or keyboard and mouse) and type of task (selecting or typing). Principal component analysis found distinct factors associated with stress (i.e., demands) and strain (i.e., response). Repeated measures analyses of variance showed that participants could discriminate the different strain induced by the input methods and tasks. However, participants' ability to discriminate between the stressors associated with that strain was mixed. Further validation of the SEAT is necessary but these results indicate that the SEAT may be a viable method of assessing ergonomics risks presented by software design. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Risk management strategies utilized by small scale poultry farmers ...

    African Journals Online (AJOL)

    Birds can only tolerate narrow temperature changes; therefore, poultry flocks are vulnerable to climate induced risk. This study investigated risk management strategies utilized by small scale poultry farmers in Oyo state. A total of 118 respondents were sampled using multi stage sampling procedure. Interview schedule was ...

  14. Disclosure of weather risks of European Utilities : Assessment of the current situation of listed utilities domiciled in Germany, France, Austria, United Kingdom and Switzerland

    OpenAIRE

    Leibfried, Peter; Schuchter, Alexander

    2010-01-01

    With regards to the scientific fact about climate change, weather risk is of increased importance to companies in weather dependent industries. Increasing volatility in temperatures and precipitation as well as unseasonal weather result in increased financial risk to weather dependent companies. This white paper assesses the current situation disclosure of weather dependency and weather risks of European exchange listed companies with the aim to promote transparency in risk reporting to ...

  15. System Analysis and Risk Assessment (SARA) system

    International Nuclear Information System (INIS)

    Krantz, E.A.; Russell, K.D.; Stewart, H.D.; Van Siclen, V.S.

    1986-01-01

    Utilization of Probabilistic Risk Assessment (PRA) related information in the day-to-day operation of plant systems has, in the past, been impracticable due to the size of the computers needed to run PRA codes. This paper discusses a microcomputer-based database system which can greatly enhance the capability of operators or regulators to incorporate PRA methodologies into their routine decision making. This system is called the System Analysis and Risk Assessment (SARA) system. SARA was developed by EG and G Idaho, Inc. at the Idaho National Engineering Laboratory to facilitate the study of frequency and consequence analyses of accident sequences from a large number of light water reactors (LWRs) in this country. This information is being amassed by several studies sponsored by the United States Nuclear Regulatory Commission (USNRC). To meet the need of portability and accessibility, and to perform the variety of calculations necessary, it was felt that a microcomputer-based system would be most suitable

  16. 2007 TOXICOLOGY AND RISK ASSESSMENT ...

    Science.gov (United States)

    EPA has announced The 2007 Toxicology and Risk Assessment Conference Cincinnati Marriott North, West Chester (Cincinnati), OHApril 23- 26, 2007 - Click to register!The Annual Toxicology and Risk Assessment Conference is a unique meeting where several Government Agencies come together to discuss toxicology and risk assessment issues that are not only of concern to the government, but also to a broader audience including academia and industry. The theme of this year's conference is Emerging Issues and Challenges in Risk Assessment and the preliminary agenda includes: Plenary Sessions and prominent speakers (tentative) include: Issues of Emerging Chemical ContaminantsUncertainty and Variability in Risk Assessment Use of Mechanistic data in IARC evaluationsParallel Sessions:Uncertainty and Variability in Dose-Response Assessment Recent Advances in Toxicity and Risk Assessment of RDX The Use of Epidemiologic Data for Risk Assessment Applications Cumulative Health Risk Assessment:

  17. Risk Assessment

    Science.gov (United States)

    How the EPA conducts risk assessment to protect human health and the environment. Several assessments are included with the guidelines, models, databases, state-based RSL Tables, local contacts and framework documents used to perform these assessments.

  18. Exploration Health Risks: Probabilistic Risk Assessment

    Science.gov (United States)

    Rhatigan, Jennifer; Charles, John; Hayes, Judith; Wren, Kiley

    2006-01-01

    Maintenance of human health on long-duration exploration missions is a primary challenge to mission designers. Indeed, human health risks are currently the largest risk contributors to the risks of evacuation or loss of the crew on long-duration International Space Station missions. We describe a quantitative assessment of the relative probabilities of occurrence of the individual risks to human safety and efficiency during space flight to augment qualitative assessments used in this field to date. Quantitative probabilistic risk assessments will allow program managers to focus resources on those human health risks most likely to occur with undesirable consequences. Truly quantitative assessments are common, even expected, in the engineering and actuarial spheres, but that capability is just emerging in some arenas of life sciences research, such as identifying and minimize the hazards to astronauts during future space exploration missions. Our expectation is that these results can be used to inform NASA mission design trade studies in the near future with the objective of preventing the higher among the human health risks. We identify and discuss statistical techniques to provide this risk quantification based on relevant sets of astronaut biomedical data from short and long duration space flights as well as relevant analog populations. We outline critical assumptions made in the calculations and discuss the rationale for these. Our efforts to date have focussed on quantifying the probabilities of medical risks that are qualitatively perceived as relatively high risks of radiation sickness, cardiac dysrhythmias, medically significant renal stone formation due to increased calcium mobilization, decompression sickness as a result of EVA (extravehicular activity), and bone fracture due to loss of bone mineral density. We present these quantitative probabilities in order-of-magnitude comparison format so that relative risk can be gauged. We address the effects of

  19. Review of various approaches for assessing public health risks in regulatory decision making: choosing the right approach for the problem.

    Science.gov (United States)

    Dearfield, Kerry L; Hoelzer, Karin; Kause, Janell R

    2014-08-01

    Stakeholders in the public health risk analysis community can possess differing opinions about what is meant by "conduct a risk assessment." In reality, there is no one-size-fits-all risk assessment that can address all public health issues, problems, and regulatory needs. Although several international and national organizations (e.g., Codex Alimentarius Commission, Office International des Epizooties, Food and Agricultural Organization, World Health Organization, National Research Council, and European Food Safety Authority) have addressed this issue, confusion remains. The type and complexity of a risk assessment must reflect the risk management needs to appropriately inform a regulatory or nonregulatory decision, i.e., a risk assessment is ideally "fit for purpose" and directly applicable to risk management issues of concern. Frequently however, there is a lack of understanding by those not completely familiar with risk assessment regarding the specific utility of different approaches for assessing public health risks. This unfamiliarity can unduly hamper the acceptance of risk assessment results by risk managers and may reduce the usefulness of such results for guiding public health policies, practices, and operations. Differences in interpretation of risk assessment terminology further complicate effective communication among risk assessors, risk managers, and stakeholders. This article provides an overview of the types of risk assessments commonly conducted, with examples primarily from the food and agricultural sectors, and a discussion of the utility and limitations of these specific approaches for assessing public health risks. Clarification of the risk management issues and corresponding risk assessment design needs during the formative stages of the risk analysis process is a key step for ensuring that the most appropriate assessment of risk is developed and used to guide risk management decisions.

  20. Methodology for assessment of safety risk due to potential accidents in US gaseous diffusion plants

    International Nuclear Information System (INIS)

    Turner, J.H.; O'Kain, D.U.

    1991-01-01

    Gaseous diffusion plants that operate in the United States represent a unique combination of nuclear and chemical hazards. Assessing and controlling the health, safety, and environmental risks that can result from natural phenomena events, process upset conditions, and operator errors require a unique methodology. Such a methodology has been developed for the diffusion plants and is being utilized to assess and control the risk of operating the plants. A summary of the methodology developed to assess the unique safety risks at the US gaseous diffusion plants is presented in this paper

  1. Evaluation of a novel risk assessment method for self-harm associated with Borderline Personality Disorder.

    Science.gov (United States)

    Rao, Sathya; Broadbear, Jillian H; Thompson, Katherine; Correia, Anna; Preston, Martin; Katz, Paul; Trett, Robert

    2017-10-01

    Borderline personality disorder (BPD) is associated with frequent self-harm and suicidal behaviours. This study compared physician-assessed self-harm risk and intervention choice according to a (i) standard risk assessment and (ii) BPD-specific risk assessment methods. Forty-five junior and senior mental health physicians were assigned to standard or BPD-specific risk training groups. The assessment utilized a BPD case vignette containing four scenarios describing high/low lethality self-harm and chronic/new patterns of self-harm behaviour. Participants chose from among four interventions, each corresponding to a risk category. Standard and BPD-specific groups were alike in their assessment of self-harm risk. Divergence occurred on intervention choice for assessments of low lethality, chronic risk ( pself harm-associated risk, BPD-specific training raised awareness of BPD-appropriate interventions, particularly in the context of chronic patterns of self-harm behaviour. Wider dissemination of BPD-specific risk training may enhance the confidence of mental health clinicians in identifying the nature of self-harm risk as well as the most clinically appropriate interventions for clients with BPD.

  2. Society of Thoracic Surgeons Risk Score Predicts Hospital Charges and Resource Utilization After Aortic Valve Replacement

    Science.gov (United States)

    Arnaoutakis, George J.; George, Timothy J.; Alejo, Diane E.; Merlo, Christian A.; Baumgartner, William A.; Cameron, Duke E.; Shah, Ashish S.

    2011-01-01

    Context The impact of Society of Thoracic Surgeons (STS) predicted mortality risk score on resource utilization after aortic valve replacement (AVR) has not been previously studied. Objective We hypothesize that increasing STS risk scores in patients having AVR are associated with greater hospital charges. Design, Setting, and Patients Clinical and financial data for patients undergoing AVR at a tertiary care, university hospital over a ten-year period (1/2000–12/2009) were retrospectively reviewed. The current STS formula (v2.61) for in-hospital mortality was used for all patients. After stratification into risk quartiles (Q), index admission hospital charges were compared across risk strata with Rank-Sum tests. Linear regression and Spearman’s coefficient assessed correlation and goodness of fit. Multivariable analysis assessed relative contributions of individual variables on overall charges. Main Outcome Measures Inflation-adjusted index hospitalization total charges Results 553 patients had AVR during the study period. Average predicted mortality was 2.9% (±3.4) and actual mortality was 3.4% for AVR. Median charges were greater in the upper Q of AVR patients [Q1–3,$39,949 (IQR32,708–51,323) vs Q4,$62,301 (IQR45,952–97,103), p=<0.01]. On univariate linear regression, there was a positive correlation between STS risk score and log-transformed charges (coefficient: 0.06, 95%CI 0.05–0.07, p<0.01). Spearman’s correlation R-value was 0.51. This positive correlation persisted in risk-adjusted multivariable linear regression. Each 1% increase in STS risk score was associated with an added $3,000 in hospital charges. Conclusions This study showed increasing STS risk score predicts greater charges after AVR. As competing therapies such as percutaneous valve replacement emerge to treat high risk patients, these results serve as a benchmark to compare resource utilization. PMID:21497834

  3. Advances in Probabilistic Risk Assessment (PRA): a look into practitioners toolbox

    International Nuclear Information System (INIS)

    Mok, J.; Kaasalainen, S.; Donnelly, K.

    2007-01-01

    The ever-increasing emphasis on the use of Probabilistic Risk Assessment (PRA) in risk-informed decision making translates into increased expectations relating to PRA applications for the groups tasked with developing and maintaining the facility PRAs. In order to succeed in meeting the demand for PRA work, it is essential to develop methodologies and tools (or utilities) that improve the efficiency with which the PRAs are processed and manipulated to obtain a solution. Examples from the Nuclear Safety Solutions (NSS) PRA Practitioners tool box include utilities for cutting logical loops, optimizing fault trees (to decrease run-times), modularizing fault trees, and converting event trees into high level fault tree logic (an important element if the PRA study is to be used to support a risk monitor such as an Equipment Out-of-Service (EOOS) Monitor). The objective of this paper is be to briefly describe the main features of these utilities, and to illustrate the value they have in terms of improving the efficiency and effectiveness of PRA development and maintenance at NSS. (author)

  4. Architecture for Integrated Medical Model Dynamic Probabilistic Risk Assessment

    Science.gov (United States)

    Jaworske, D. A.; Myers, J. G.; Goodenow, D.; Young, M.; Arellano, J. D.

    2016-01-01

    Probabilistic Risk Assessment (PRA) is a modeling tool used to predict potential outcomes of a complex system based on a statistical understanding of many initiating events. Utilizing a Monte Carlo method, thousands of instances of the model are considered and outcomes are collected. PRA is considered static, utilizing probabilities alone to calculate outcomes. Dynamic Probabilistic Risk Assessment (dPRA) is an advanced concept where modeling predicts the outcomes of a complex system based not only on the probabilities of many initiating events, but also on a progression of dependencies brought about by progressing down a time line. Events are placed in a single time line, adding each event to a queue, as managed by a planner. Progression down the time line is guided by rules, as managed by a scheduler. The recently developed Integrated Medical Model (IMM) summarizes astronaut health as governed by the probabilities of medical events and mitigation strategies. Managing the software architecture process provides a systematic means of creating, documenting, and communicating a software design early in the development process. The software architecture process begins with establishing requirements and the design is then derived from the requirements.

  5. What risk assessments of genetically modified organisms can learn from institutional analyses of public health risks.

    Science.gov (United States)

    Rajan, S Ravi; Letourneau, Deborah K

    2012-01-01

    The risks of genetically modified organisms (GMOs) are evaluated traditionally by combining hazard identification and exposure estimates to provide decision support for regulatory agencies. We question the utility of the classical risk paradigm and discuss its evolution in GMO risk assessment. First, we consider the problem of uncertainty, by comparing risk assessment for environmental toxins in the public health domain with genetically modified organisms in the environment; we use the specific comparison of an insecticide to a transgenic, insecticidal food crop. Next, we examine normal accident theory (NAT) as a heuristic to consider runaway effects of GMOs, such as negative community level consequences of gene flow from transgenic, insecticidal crops. These examples illustrate how risk assessments are made more complex and contentious by both their inherent uncertainty and the inevitability of failure beyond expectation in complex systems. We emphasize the value of conducting decision-support research, embracing uncertainty, increasing transparency, and building interdisciplinary institutions that can address the complex interactions between ecosystems and society. In particular, we argue against black boxing risk analysis, and for a program to educate policy makers about uncertainty and complexity, so that eventually, decision making is not the burden that falls upon scientists but is assumed by the public at large.

  6. What Risk Assessments of Genetically Modified Organisms Can Learn from Institutional Analyses of Public Health Risks

    Directory of Open Access Journals (Sweden)

    S. Ravi Rajan

    2012-01-01

    Full Text Available The risks of genetically modified organisms (GMOs are evaluated traditionally by combining hazard identification and exposure estimates to provide decision support for regulatory agencies. We question the utility of the classical risk paradigm and discuss its evolution in GMO risk assessment. First, we consider the problem of uncertainty, by comparing risk assessment for environmental toxins in the public health domain with genetically modified organisms in the environment; we use the specific comparison of an insecticide to a transgenic, insecticidal food crop. Next, we examine normal accident theory (NAT as a heuristic to consider runaway effects of GMOs, such as negative community level consequences of gene flow from transgenic, insecticidal crops. These examples illustrate how risk assessments are made more complex and contentious by both their inherent uncertainty and the inevitability of failure beyond expectation in complex systems. We emphasize the value of conducting decision-support research, embracing uncertainty, increasing transparency, and building interdisciplinary institutions that can address the complex interactions between ecosystems and society. In particular, we argue against black boxing risk analysis, and for a program to educate policy makers about uncertainty and complexity, so that eventually, decision making is not the burden that falls upon scientists but is assumed by the public at large.

  7. Utility market penetration assessment of fusion-fission hybrids

    International Nuclear Information System (INIS)

    Jensen, B.K.; Nour, N.E.; Piascik, T.M.

    1981-01-01

    The objective of this paper is to describe the utility generation expansion evaluation procedure and to present the results of a fusion-fission hybrid market penetration assessment in a model of a typical utility system. The analysis addresses the key factors and tradeoffs affecting the utility's evaluation of generation alternatives

  8. An approach for risk informed safety culture assessment for Canadian nuclear power stations

    International Nuclear Information System (INIS)

    Nelson, W.R.

    2010-01-01

    One of the most important components of effective safety and risk management for nuclear power stations is a healthy safety culture. DNV has developed an approach for risk informed safety culture assessment that combines two complementary paradigms for safety and risk management: loss prevention - for preventing and intervening in accidents; and critical function management - for achieving safety and performance goals. Combining these two paradigms makes it possible to provide more robust systems for safety management and to support a healthy safety culture. This approach is being applied to safety culture assessment in partnership with a Canadian nuclear utility. (author)

  9. Risk assessment and adaptive runoff utilization in water resource system considering the complex relationship among water supply, electricity generation and environment

    Science.gov (United States)

    Zhou, J.; Zeng, X.; Mo, L.; Chen, L.; Jiang, Z.; Feng, Z.; Yuan, L.; He, Z.

    2017-12-01

    Generally, the adaptive utilization and regulation of runoff in the source region of China's southwest rivers is classified as a typical multi-objective collaborative optimization problem. There are grim competitions and incidence relation in the subsystems of water supply, electricity generation and environment, which leads to a series of complex problems represented by hydrological process variation, blocked electricity output and water environment risk. Mathematically, the difficulties of multi-objective collaborative optimization focus on the description of reciprocal relationships and the establishment of evolving model of adaptive systems. Thus, based on the theory of complex systems science, this project tries to carry out the research from the following aspects: the changing trend of coupled water resource, the covariant factor and driving mechanism, the dynamic evolution law of mutual feedback dynamic process in the supply-generation-environment coupled system, the environmental response and influence mechanism of coupled mutual feedback water resource system, the relationship between leading risk factor and multiple risk based on evolutionary stability and dynamic balance, the transfer mechanism of multiple risk response with the variation of the leading risk factor, the multidimensional coupled feedback system of multiple risk assessment index system and optimized decision theory. Based on the above-mentioned research results, the dynamic method balancing the efficiency of multiple objectives in the coupled feedback system and optimized regulation model of water resources is proposed, and the adaptive scheduling mode considering the internal characteristics and external response of coupled mutual feedback system of water resource is established. In this way, the project can make a contribution to the optimal scheduling theory and methodology of water resource management under uncertainty in the source region of Southwest River.

  10. Hanford Site's Integrated Risk Assessment Program: No-intervention risk assessment

    International Nuclear Information System (INIS)

    Mahaffey, J.A.; Dukelow, J.S. Jr.; Stenner, R.D.

    1994-08-01

    The long-term goal of the Integrated Risk Assessment program (IRAP) is to estimate risks to workers, the public, organizations, and groups with reserved rights to Site access, the ecosystem, and natural resources to aid in managing environmental restoration and waste management at the Hanford Site. For each of these, information is needed about current risks, risks during cleanup, and endstate risks. The objective is three-fold: to determine if and when to remediate, and to what extent; to identify information unavailable but needed to make better cleanup decisions; to establish technology performance criteria for achieving desired cleanup levels; to understand costs and benefits of activities from a Site-wide perspective. The no-intervention risk, assessment is the initial evaluation of public health risks conducted under IRAP. The objective is to identify types of activities that the US Department of Energy (DOE) must accomplish for closure of the Hanford Site, defined as no further DOE intervention. There are two primary conclusions from the no-intervention risk assessment. First, some maintenance and operations activities at Hanford must be continued to protect the public from grave risks. However, when large Hanford expenditures are compared to cleanup progress, funds expended for maintenance and operations must be put in proper perspective. Second, stakeholder's emphasis on public risks at Hanford, as indicated by remediation priorities, are not in line with those estimated. The focus currently is on compliance with regulations, and on dealing with issues which are visible to stakeholders

  11. Chemical Risk Assessment

    Science.gov (United States)

    This course is aimed at providing an overview of the fundamental guiding principles and general methods used in chemical risk assessment. Chemical risk assessment is a complex and ever-evolving process. These principles and methods have been organized by the National Research Cou...

  12. Addressing dependability by applying an approach for model-based risk assessment

    International Nuclear Information System (INIS)

    Gran, Bjorn Axel; Fredriksen, Rune; Thunem, Atoosa P.-J.

    2007-01-01

    This paper describes how an approach for model-based risk assessment (MBRA) can be applied for addressing different dependability factors in a critical application. Dependability factors, such as availability, reliability, safety and security, are important when assessing the dependability degree of total systems involving digital instrumentation and control (I and C) sub-systems. In order to identify risk sources their roles with regard to intentional system aspects such as system functions, component behaviours and intercommunications must be clarified. Traditional risk assessment is based on fault or risk models of the system. In contrast to this, MBRA utilizes success-oriented models describing all intended system aspects, including functional, operational and organizational aspects of the target. The EU-funded CORAS project developed a tool-supported methodology for the application of MBRA in security-critical systems. The methodology has been tried out within the telemedicine and e-commerce areas, and provided through a series of seven trials a sound basis for risk assessments. In this paper the results from the CORAS project are presented, and it is discussed how the approach for applying MBRA meets the needs of a risk-informed Man-Technology-Organization (MTO) model, and how methodology can be applied as a part of a trust case development

  13. Addressing dependability by applying an approach for model-based risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Gran, Bjorn Axel [Institutt for energiteknikk, OECD Halden Reactor Project, NO-1751 Halden (Norway)]. E-mail: bjorn.axel.gran@hrp.no; Fredriksen, Rune [Institutt for energiteknikk, OECD Halden Reactor Project, NO-1751 Halden (Norway)]. E-mail: rune.fredriksen@hrp.no; Thunem, Atoosa P.-J. [Institutt for energiteknikk, OECD Halden Reactor Project, NO-1751 Halden (Norway)]. E-mail: atoosa.p-j.thunem@hrp.no

    2007-11-15

    This paper describes how an approach for model-based risk assessment (MBRA) can be applied for addressing different dependability factors in a critical application. Dependability factors, such as availability, reliability, safety and security, are important when assessing the dependability degree of total systems involving digital instrumentation and control (I and C) sub-systems. In order to identify risk sources their roles with regard to intentional system aspects such as system functions, component behaviours and intercommunications must be clarified. Traditional risk assessment is based on fault or risk models of the system. In contrast to this, MBRA utilizes success-oriented models describing all intended system aspects, including functional, operational and organizational aspects of the target. The EU-funded CORAS project developed a tool-supported methodology for the application of MBRA in security-critical systems. The methodology has been tried out within the telemedicine and e-commerce areas, and provided through a series of seven trials a sound basis for risk assessments. In this paper the results from the CORAS project are presented, and it is discussed how the approach for applying MBRA meets the needs of a risk-informed Man-Technology-Organization (MTO) model, and how methodology can be applied as a part of a trust case development.

  14. Assessing the Utility of a Demand Assessment for Functional Analysis

    Science.gov (United States)

    Roscoe, Eileen M.; Rooker, Griffin W.; Pence, Sacha T.; Longworth, Lynlea J.

    2009-01-01

    We evaluated the utility of an assessment for identifying tasks for the functional analysis demand condition with 4 individuals who had been diagnosed with autism. During the demand assessment, a therapist presented a variety of tasks, and observers measured problem behavior and compliance to identify demands associated with low levels of…

  15. An integrated risk assessment approach: Risk assessment in the programmatic environmental impact statement

    International Nuclear Information System (INIS)

    Morris, J.M.

    1994-01-01

    The following paper is an informal summary of salient points made in the presentation entitled open-quotes An Integrated Risk Assessment Approach: Risk Assessment in the Programmatic Environmental Impact Statement (PEIS).close quotes. This presentation was given at the U.S. DOE Integrated Planning Workshop in Denver, Colorado on June 2, 1994. Integrated decision analysis is very important in environmental restoration and waste management in the evaluation of such things as land use planning, waste load forecasting, cost analyses, and technology development activities. Integrated risk assessment is an approach that addresses multiple components of risk, including: risks from surplus facilities as well as typical environmental restoration sites, risks to the public, risks to workers, ecological risk, risks before, during and after remediation activities, and others

  16. Utility of Recent Studies to Assess the National Research Council 2001 Estimates of Cancer Risk from Ingested Arsenic

    Science.gov (United States)

    Gibb, Herman; Haver, Cary; Gaylor, David; Ramasamy, Santhini; Lee, Janice S.; Lobdell, Danelle; Wade, Timothy; Chen, Chao; White, Paul; Sams, Reeder

    2011-01-01

    Objective The purpose of this review is to evaluate the impact of recent epidemiologic literature on the National Research Council (NRC) assessment of the lung and bladder cancer risks from ingesting low concentrations (ecologic nature of the Taiwanese studies on which the NRC estimates are based present certain limitations, the data from these studies have particular strengths in that they describe lung and bladder cancer risks resulting from lifetime exposure in a large population and remain the best data on which to conduct quantitative risk assessment. Continued follow-up of a population in northeastern Taiwan, however, offers the best opportunity to improve the cancer risk assessment for arsenic in drinking water. Future studies of arsenic < 100 μg/L in drinking water and lung and bladder cancer should consider adequacy of the sample size, the synergistic relationship of arsenic and smoking, duration of arsenic exposure, age when exposure began and ended, and histologic subtype. PMID:21030336

  17. The relation of risk assessment and health impact assessment

    DEFF Research Database (Denmark)

    Ádám, Balázs; Gulis, Gabriel

    2013-01-01

    than assessing a present situation. As part of this process, however, methods applied in risk assessment are used. Risk assessment typically characterises relation of a well-defined risk factor to a well-defined health outcome. Within HIA usually several individual risk assessments are needed...... of the causal chain from the proposal through related health determinants and risk factors to health outcomes. The stepwise analysis, systematic prioritization and consideration of horizontal interactions between the causal pathways make it feasible to use widely recognized risk assessment methods in the HIA......The level and distribution of health risks in a society is substantially influenced by measures of various policies, programmes or projects. Risk assessment can evaluate the nature, likelihood and severity of an adverse effect. Health impact assessment (HIA) provides similar function when used...

  18. A Framework for Linking Population Model Development with Ecological Risk Assessment Objectives.

    Science.gov (United States)

    The value of models that link organism‐level impacts to the responses of a population in ecological risk assessments (ERAs) has been demonstrated extensively over the past few decades. There is little debate about the utility of these models to translate multiple organism&#...

  19. Assessment of cardiovascular risk.

    LENUS (Irish Health Repository)

    Cooney, Marie Therese

    2010-10-01

    Atherosclerotic cardiovascular disease (CVD) is the most common cause of death worldwide. Usually atherosclerosis is caused by the combined effects of multiple risk factors. For this reason, most guidelines on the prevention of CVD stress the assessment of total CVD risk. The most intensive risk factor modification can then be directed towards the individuals who will derive the greatest benefit. To assist the clinician in calculating the effects of these multiple interacting risk factors, a number of risk estimation systems have been developed. This review address several issues regarding total CVD risk assessment: Why should total CVD risk be assessed? What risk estimation systems are available? How well do these systems estimate risk? What are the advantages and disadvantages of the current systems? What are the current limitations of risk estimation systems and how can they be resolved? What new developments have occurred in CVD risk estimation?

  20. Conceptual geoinformation model of natural hazards risk assessment

    Science.gov (United States)

    Kulygin, Valerii

    2016-04-01

    Natural hazards are the major threat to safe interactions between nature and society. The assessment of the natural hazards impacts and their consequences is important in spatial planning and resource management. Today there is a challenge to advance our understanding of how socio-economical and climate changes will affect the frequency and magnitude of hydro-meteorological hazards and associated risks. However, the impacts from different types of natural hazards on various marine and coastal economic activities are not of the same type. In this study, the conceptual geomodel of risk assessment is presented to highlight the differentiation by the type of economic activities in extreme events risk assessment. The marine and coastal ecosystems are considered as the objects of management, on the one hand, and as the place of natural hazards' origin, on the other hand. One of the key elements in describing of such systems is the spatial characterization of their components. Assessment of ecosystem state is based on ecosystem indicators (indexes). They are used to identify the changes in time. The scenario approach is utilized to account for the spatio-temporal dynamics and uncertainty factors. Two types of scenarios are considered: scenarios of using ecosystem services by economic activities and scenarios of extreme events and related hazards. The reported study was funded by RFBR, according to the research project No. 16-35-60043 mol_a_dk.

  1. Variations of emission characterization of PAHs emitted from different utility boilers of coal-fired power plants and risk assessment related to atmospheric PAHs

    International Nuclear Information System (INIS)

    Wang, Ruwei; Liu, Guijian; Zhang, Jiamei

    2015-01-01

    Coal-fired power plants (CFPPs) represent important source of atmospheric PAHs, however, their emission characterization are still largely unknown. In this work, the concentration, distribution and gas-particle partitioning of PM_1_0- and gas-phase PAHs in flue gas emitted from different coal-fired utility boilers were investigated. Moreover, concentration and distribution in airborne PAHs from different functional areas of power plants were studied. People's inhalatory and dermal exposures to airborne PAHs at these sites were estimated and their resultant lung cancer and skin cancer risks were assessed. Results indicated that the boiler capacity and operation conditions have significant effect on PAH concentrations in both PM_1_0 and gas phases due to the variation of combustion efficiency, whereas they take neglected effect on PAH distributions. The wet flue gas desulphurization (WFGD) takes significant effect on the scavenging of PAH in both PM_1_0 and gas phases, higher scavenging efficiency were found for less volatile PAHs. PAH partitioning is dominated by absorption into organic matter and accompanied by adsorption onto PM_1_0 surface. In addition, different partitioning mechanism is observed for individual PAHs, which is assumed arising from their chemical affinity and vapor pressure. Risk assessment indicates that both inhalation and dermal contact greatly contribute to the cancer risk for CFPP workers and nearby residents. People working in workshop are exposed to greater inhalation and dermal exposure risk than people living in nearby vicinity and working office. - Highlights: • PAH distribution in PM_1_0 and gas phases primarily depend on the vapor pressure. • Combustion conditions and WFGD show typical effects on PAH level and profile. • PAH partitioning is dominated by absorption and also accompanied by adsorption. • Individual PAHs show different partitioning mechanisms in PM_1_0- and gas-phases. • People in workshop suffer greater cancer

  2. Using the Violence Risk Scale-Sexual Offense version in sexual violence risk assessments: Updated risk categories and recidivism estimates from a multisite sample of treated sexual offenders.

    Science.gov (United States)

    Olver, Mark E; Mundt, James C; Thornton, David; Beggs Christofferson, Sarah M; Kingston, Drew A; Sowden, Justina N; Nicholaichuk, Terry P; Gordon, Audrey; Wong, Stephen C P

    2018-04-30

    The present study sought to develop updated risk categories and recidivism estimates for the Violence Risk Scale-Sexual Offense version (VRS-SO; Wong, Olver, Nicholaichuk, & Gordon, 2003-2017), a sexual offender risk assessment and treatment planning tool. The overarching purpose was to increase the clarity and accuracy of communicating risk assessment information that includes a systematic incorporation of new information (i.e., change) to modify risk estimates. Four treated samples of sexual offenders with VRS-SO pretreatment, posttreatment, and Static-99R ratings were combined with a minimum follow-up period of 10-years postrelease (N = 913). Logistic regression was used to model 5- and 10-year sexual and violent (including sexual) recidivism estimates across 6 different regression models employing specific risk and change score information from the VRS-SO and/or Static-99R. A rationale is presented for clinical applications of select models and the necessity of controlling for baseline risk when utilizing change information across repeated assessments. Information concerning relative risk (percentiles) and absolute risk (recidivism estimates) is integrated with common risk assessment language guidelines to generate new risk categories for the VRS-SO. Guidelines for model selection and forensic clinical application of the risk estimates are discussed. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  3. Probabilistic safety assessment based expert systems in support of dynamic risk assessment

    International Nuclear Information System (INIS)

    Varde, P.V.; Sharma, U.L.; Marik, S.K.; Raina, V.K.; Tikku, A.C.

    2006-01-01

    Probabilistic Safety Assessment (PSA) studies are being performed, world over as part of integrated risk assessment for Nuclear Power Plants and in many cases PSA insight is utilized in support of decision making. Though the modern plants are built with inherent safety provisions, particularly to reduce the supervisory requirements during initial period into the accident, it is always desired to develop an efficient user friendly real-time operator advisory system for handling of plant transients/emergencies which would be of immense benefit for the enhancement of operational safety of the plant. This paper discusses an integrated approach for the development of operator support system. In this approach, PSA methodology and the insight obtained from PSA has been utilized for development of knowledge based or rule based experts system. While Artificial Neural Network (ANN) approach has been employed for transient identification, rule-base expert system shell environment was used for the development of diagnostic module in this system. Attempt has been made to demonstrate that this approach offers an efficient framework for addressing requirements related to handling of real-time/dynamic scenario. (author)

  4. Optimal investment and indifference pricing when risk aversion is not monotone: SAHARA utility functions

    NARCIS (Netherlands)

    Chen, A.; Pelsser, A.; Vellekoop, M.

    2008-01-01

    Abstract. We develop a new class of utility functions, SAHARA utility, with the dis- tinguishing feature that they implement the assumption that agents may become less risk-averse for very low values of wealth. This means that SAHARA utility can be used to characterize risk gambling behavior of an

  5. Utilization of small changes in serum creatinine with clinical risk factors to assess the risk of AKI in critically lll adults.

    Science.gov (United States)

    Cruz, Dinna N; Ferrer-Nadal, Asunción; Piccinni, Pasquale; Goldstein, Stuart L; Chawla, Lakhmir S; Alessandri, Elisa; Belluomo Anello, Clara; Bohannon, Will; Bove, Tiziana; Brienza, Nicola; Carlini, Mauro; Forfori, Francesco; Garzotto, Francesco; Gramaticopolo, Silvia; Iannuzzi, Michele; Montini, Luca; Pelaia, Paolo; Ronco, Claudio

    2014-04-01

    Disease biomarkers require appropriate clinical context to be used effectively. Combining clinical risk factors, in addition to small changes in serum creatinine, has been proposed to improve the assessment of AKI. This notion was developed in order to identify the risk of AKI early in a patient's clinical course. We set out to assess the performance of this combination approach. A secondary analysis of data from a prospective multicenter intensive care unit cohort study (September 2009 to April 2010) was performed. Patients at high risk using this combination approach were defined as an early increase in serum creatinine of 0.1-0.4 mg/dl, depending on number of clinical factors predisposing to AKI. AKI was defined and staged using the Acute Kidney Injury Network criteria. The primary outcome was evolution to severe AKI (Acute Kidney Injury Network stages 2 and 3) within 7 days in the intensive care unit. Of 506 patients, 214 (42.2%) patients had early creatinine elevation and were deemed at high risk for AKI. This group was more likely to subsequently develop the primary endpoint (16.4% versus 1.0% [not at high risk], Pcreatinine, and hazard tier for AKI, early creatinine elevation remained an independent predictor for severe AKI (adjusted relative risk, 12.86; 95% confidence interval, 3.52 to 46.97). Addition of early creatinine elevation to the best clinical model improved prediction of the primary outcome (area under the receiver operating characteristic curve increased from 0.75 to 0.83, Phigh AKI risk, based on the combination of clinical factors and early creatinine elevation, are significantly more likely to develop severe AKI. As initially hypothesized, the high-risk combination group methodology can be used to identify patients at low risk for severe AKI in whom AKI biomarker testing may be expected to have low yield. The high risk combination group methodology could potentially allow clinicians to optimize biomarker use.

  6. Comparison of two instruments for assessing risk of postoperative nausea and vomiting.

    Science.gov (United States)

    Kapoor, Rachna; Hola, Eric T; Adamson, Robert T; Mathis, A Scott

    2008-03-01

    Two instruments for assessing patients' risk of postoperative nausea and vomiting (PONV) were compared. The existing protocol (protocol 1) assessed PONV risk using 16 weighted risk factors and was used for both adults and pediatric patients. The new protocol (protocol 2) included a form for adults and a pediatric-specific form. The form for adults utilized the simplified risk score, calculated using a validated, nonweighted, 4-point scale, and categorized patients' risk of PONV as low, moderate, or high. The form for pediatric patients used a 7-point, non-weighted scale and categorized patients' risk of PONV as moderate or high. A list was generated of all patients who had surgery during August 2005, for whom protocol 1 was used, and during April 2006, for whom protocol 2 was used. Fifty patients from each time period were randomly selected for data analysis. Data collected included the percentage of the form completed, the development of PONV, the number of PONV risk factors, patient demographics, and the appropriateness of prophylaxis. The mean +/- S.D. number of PONV risk factors was significantly lower in the group treated according to protocol 2 ( p = 0.001), but fewer patients in this group were categorized as low or moderate risk and more patients were identified as high risk (p < 0.001). More patients assessed by protocol 2 received fewer interventions than recommended (p < 0.001); however, the frequency of PONV did not significantly differ between groups. Implementation of a validated and simplified PONV risk-assessment tool appeared to improve form completion rates and appropriate risk assessment; however, the rates of PONV remained similar and fewer patients received appropriate prophylaxis compared with patients assessed by the existing risk-assessment tool.

  7. Bruce NGS B risk assessment (BBRA) peer review process

    International Nuclear Information System (INIS)

    Kaasalainen, S.; Crocker, W.P.; Webb, W.A.

    2001-01-01

    Risk-informed decision making is considered an effective approach to managing the risk of nuclear power plant operation in a competitive market. Hence, increased reliance on the station probabilistic risk assessments (PRAs) to provide risk perspective inputs is inevitable. With increased reliance on the PRAs it is imperative that PRAs have the characteristics necessary to provide the required information. Recognizing the increased requirements on nuclear power plant PRAs the nuclear industry in the United States has expended significant effort over the past few years defining the required characteristics of a PRA for various applications. More recently several owners groups have drafted guidelines for PRA certification and several U.S. utilities have had their PRAs certified. During the year 2000 Ontario Power Generation, Nuclear (OPG,N) subjected the PRA of one of its stations to the U.S. style certification process. The PRA selected for this process was the Bruce B Risk Assessment (BBRA). BBRA was chosen for this process since it is the first OPG, N PRA to be used for risk-informed applications. However, the strengths of the BBRA identified from the certification process and the lessons learned are also largely applicable to the other OPG, N plant PRAs due to the use of similar methods and tools

  8. Health risk assessment based on injection of upgraded biogas in natural gas grid

    International Nuclear Information System (INIS)

    Leroux, C.; Modelon, H.; Rousselle, C.; Zdanevitch, I.; Evanno, S.

    2010-01-01

    This document presents the opinion of the French Agency for Environmental and Occupational Health Safety (AFSSET). Results are based on a collective expertise conducted to assess health risks associated with the injection of biogas in the natural gas grid. The complete assessment is published and available on the web site of the Agency; only the major results are presented in this document. Following recommendations issued by AFSSET in 2008, a new study has been initiated to collect and analyze data on the composition of biogas from sewage sludge. The French National Institute for Industrial Environment and Risks (INERIS) is in charge of this project. The data will be used to assess the accidental risks (resulting from the upgrading of biogas, transport by pipeline and utilization for energy purposes) and health risks for users (resulting from the injection in the natural gas grid). (authors)

  9. Information needs for risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  10. Barriers and Facilitators for Utilization of Genetic Counseling and Risk Assessment Services in Young Female Breast Cancer Survivors

    Directory of Open Access Journals (Sweden)

    Beth Anderson

    2012-01-01

    Full Text Available Introduction. Women diagnosed with breast cancer at a young age are more likely to carry a cancer predisposing genetic mutation. Per the current NCCN recommendations, women diagnosed under age 50 should be referred to cancer genetic counseling for further risk evaluation. This study seeks to assess patient-reported barriers and facilitators to receiving genetic counseling and risk assessment among a community-based population of young breast cancer survivors (YBCS. Methods. Through the Michigan Cancer Surveillance Program, a state-based cancer registry, 488 women diagnosed with breast cancer before age 50 in 2006-2007 were identified. They received a mail survey regarding family history and facilitators and barriers to receiving genetic counseling and risk assessment. Results. Responses were received from 289 women (59.2%. One hundred twenty-two (42.2% reported having received cancer genetic counseling. The most frequent reason identified for receiving services was to benefit their family's future. The top reasons for not attending were “no one recommended it” and “medical insurance coverage issues.” Discussion. This study is the first published report using a state cancer registry to determine facilitators and barriers to receiving genetic counseling and risk assessment among YBCS. These findings demonstrate the need for additional awareness and education about appropriate indications for genetic services.

  11. Barriers and Facilitators for Utilization of Genetic Counseling and Risk Assessment Services in Young Female Breast Cancer Survivors

    International Nuclear Information System (INIS)

    Anderson, B.; McLosky, J.; Wasilevich, E.; Callo, S. L.; Duquette, D.; Copeland, G.

    2012-01-01

    Introduction. Women diagnosed with breast cancer at a young age are more likely to carry a cancer predisposing genetic mutation. Per the current NCCN recommendations, women diagnosed under age 50 should be referred to cancer genetic counseling for further risk evaluation. This study seeks to assess patient-reported barriers and facilitators to receiving genetic counseling and risk assessment among a community-based population of young breast cancer survivors (YBCS). Methods. Through the Michigan Cancer Surveillance Program, a state-based cancer registry, 488 women diagnosed with breast cancer before age 50 in 2006-2007 were identified. They received a mail survey regarding family history and facilitators and barriers to receiving genetic counseling and risk assessment. Results. Responses were received from 289 women (59.2%). One hundred twenty-two (42.2%) reported having received cancer genetic counseling. The most frequent reason identified for receiving services was to benefit their family's future. The top reasons for not attending were “no one recommended it” and “medical insurance coverage issues.” Discussion. This study is the first published report using a state cancer registry to determine facilitators and barriers to receiving genetic counseling and risk assessment among YBCS. These findings demonstrate the need for additional awareness and education about appropriate indications for genetic services.

  12. Probabilistic risk assessment as an aid to risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1982-01-01

    Probabilistic risk assessments are providing important insights into nuclear power plant safety. Their value is two-fold: first as a means of quantifying nuclear plant risk including contributors to risk, and second as an aid to risk management. A risk assessment provides an analytical plant model that can be the basis for performing meaningful decision analyses for controlling safety. It is the aspect of quantitative risk management that makes probabilistic risk assessment an important technical discipline of the future

  13. Impact of Publicly Financed Health Insurance Schemes on Healthcare Utilization and Financial Risk Protection in India: A Systematic Review.

    Science.gov (United States)

    Prinja, Shankar; Chauhan, Akashdeep Singh; Karan, Anup; Kaur, Gunjeet; Kumar, Rajesh

    2017-01-01

    Several publicly financed health insurance schemes have been launched in India with the aim of providing universalizing health coverage (UHC). In this paper, we report the impact of publicly financed health insurance schemes on health service utilization, out-of-pocket (OOP) expenditure, financial risk protection and health status. Empirical research studies focussing on the impact or evaluation of publicly financed health insurance schemes in India were searched on PubMed, Google scholar, Ovid, Scopus, Embase and relevant websites. The studies were selected based on two stage screening PRISMA guidelines in which two researchers independently assessed the suitability and quality of the studies. The studies included in the review were divided into two groups i.e., with and without a comparison group. To assess the impact on utilization, OOP expenditure and health indicators, only the studies with a comparison group were reviewed. Out of 1265 articles screened after initial search, 43 studies were found eligible and reviewed in full text, finally yielding 14 studies which had a comparator group in their evaluation design. All the studies (n-7) focussing on utilization showed a positive effect in terms of increase in the consumption of health services with introduction of health insurance. About 70% studies (n-5) studies with a strong design and assessing financial risk protection showed no impact in reduction of OOP expenditures, while remaining 30% of evaluations (n-2), which particularly evaluated state sponsored health insurance schemes, reported a decline in OOP expenditure among the enrolled households. One study which evaluated impact on health outcome showed reduction in mortality among enrolled as compared to non-enrolled households, from conditions covered by the insurance scheme. While utilization of healthcare did improve among those enrolled in the scheme, there is no clear evidence yet to suggest that these have resulted in reduced OOP expenditures or

  14. Customer-oriented risk assessment in network utilities

    International Nuclear Information System (INIS)

    Gómez Fernández, Juan F.; Márquez, Adolfo Crespo; López-Campos, Mónica A.

    2016-01-01

    For companies that distribute services such as telecommunications, water, energy, gas, etc., quality perceived by the customers has a strong impact on the fulfillment of financial goals, positively increasing the demand and negatively increasing the risk of customer churn (loss of customers). Failures by these companies may cause customer affection in a massive way, augmenting the intention to leave the company. Therefore, maintenance performance and specifically service reliability has a strong influence on financial goals. This paper proposes a methodology to evaluate the contribution of the maintenance department in economic terms, based on service unreliability by network failures. The developed methodology aims to provide an analysis of failures to facilitate decision making about maintenance (preventive/predictive and corrective) costs versus negative impacts in end-customer invoicing based on the probability of losing customers. Survival analysis of recurrent failures with the General Renewal Process distribution is used for this novel purpose with the intention to be applied as a standard procedure to calculate the expected maintenance financial impact, for a given period of time. Also, geographical areas of coverage are distinguished, enabling the comparison of different technical or management alternatives. Two case studies in a telecommunications services company are presented in order to illustrate the applicability of the methodology. - Highlights: • Reliability and reparability impact the rate of abandonment of customers. • Expected reliability and interruptions must be contemplated in services contracts. • Preventive maintenance reduces the risk of abandonment, besides corrective costs. • Analysis of investment in service reliability vs. impact on customer retention. • Reliability of services has a positive impact in business financial situation.

  15. Risk assessment of major hazards and its application in urban planning: a case study.

    Science.gov (United States)

    Zhou, Yafei; Liu, Mao

    2012-03-01

    With the rapid development of industry in China, the number of establishments that are proposed or under construction is increasing year by year, and many are industries that handle flammable, explosive, toxic, harmful, and dangerous substances. Accidents such as fire, explosion, and toxic diffusion inevitably happen. Accidents resulting from these major hazards in cities cause a large number of casualties and property losses. It is increasingly important to analyze the risk of major hazards in cities realistically and to suitably plan and utilize the surrounding land based on the risk analysis results, thereby reducing the hazards. A theoretical system for risk assessment of major hazards in cities is proposed in this article, and the major hazard risk for the entire city is analyzed quantitatively. Risks of various major accidents are considered together, superposition effect is analyzed, individual risk contours of the entire city are drawn out, and the level of risk in the city is assessed using "as low as reasonably practicable" guidelines. After the entire city's individual risk distribution is obtained, risk zones are divided according to corresponding individual risk value of HSE, and land-use planning suggestions are proposed. Finally, a city in China is used as an example to illustrate the risk assessment process of the city's major hazard and its application in urban land-use planning. The proposed method has a certain theoretical and practical significance in establishing and improving risk analysis of major hazard and urban land-use planning. On the one hand, major urban public risk is avoided; further, the land is utilized in the best possible way in order to obtain the maximum benefit from its use. © 2011 Society for Risk Analysis.

  16. Community-Based Diabetes Screening and Risk Assessment in Rural West Virginia

    Directory of Open Access Journals (Sweden)

    Ranjita Misra

    2016-01-01

    Full Text Available This project utilized a cross-sectional study design to assess diabetes risk among 540 individuals from 12 counties using trained extension agents and community organizations in West Virginia. Individuals were screened for diabetes using (1 the validated 7-item diabetes risk assessment survey and (2 hemoglobin A1c tests. Demographic and lifestyle behaviors were also collected. The average age, body mass index, and A1c were 51.2±16.4, 31.1±7.5, and 5.8±0.74, respectively. The majority were females, Non-Hispanic Whites with no prior diagnosis of diabetes. Screenings showed that 61.8% of participants were at high risk for diabetes. Family history of diabetes (siblings or parents, overweight or obese status, sedentary lifestyle, and older age were commonly prevalent risk factors. Higher risk scores computed from the 7-item questions correlated positively with higher A1c (r=0.221, P<0.001. In multivariate logistic regression analyses, higher diabetes risk was predicted by obesity, older age, family history of hypertension, and gestational diabetes. Females were 4 times at higher risk than males. The findings indicated that community-based screenings were an effective way to assess diabetes risk in rural West Virginia. Linking diabetes screenings with referrals to lifestyle programs for high risk individuals can help reduce the burden of diabetes in the state.

  17. Engineering Risk Assessment of Space Thruster Challenge Problem

    Science.gov (United States)

    Mathias, Donovan L.; Mattenberger, Christopher J.; Go, Susie

    2014-01-01

    The Engineering Risk Assessment (ERA) team at NASA Ames Research Center utilizes dynamic models with linked physics-of-failure analyses to produce quantitative risk assessments of space exploration missions. This paper applies the ERA approach to the baseline and extended versions of the PSAM Space Thruster Challenge Problem, which investigates mission risk for a deep space ion propulsion system with time-varying thruster requirements and operations schedules. The dynamic mission is modeled using a combination of discrete and continuous-time reliability elements within the commercially available GoldSim software. Loss-of-mission (LOM) probability results are generated via Monte Carlo sampling performed by the integrated model. Model convergence studies are presented to illustrate the sensitivity of integrated LOM results to the number of Monte Carlo trials. A deterministic risk model was also built for the three baseline and extended missions using the Ames Reliability Tool (ART), and results are compared to the simulation results to evaluate the relative importance of mission dynamics. The ART model did a reasonable job of matching the simulation models for the baseline case, while a hybrid approach using offline dynamic models was required for the extended missions. This study highlighted that state-of-the-art techniques can adequately adapt to a range of dynamic problems.

  18. Suicide risk assessment: Trust an implicit probe or listen to the patient?

    Science.gov (United States)

    Harrison, Dominique P; Stritzke, Werner G K; Fay, Nicolas; Hudaib, Abdul-Rahman

    2018-05-21

    Previous research suggests implicit cognition can predict suicidal behavior. This study examined the utility of the death/suicide implicit association test (d/s-IAT) in acute and prospective assessment of suicide risk and protective factors, relative to clinician and patient estimates of future suicide risk. Patients (N = 128; 79 female; 111 Caucasian) presenting to an emergency department were recruited if they reported current suicidal ideation or had been admitted because of an acute suicide attempt. Patients completed the d/s-IAT and self-report measures assessing three death-promoting (e.g., suicide ideation) and two life-sustaining (e.g., zest for life) factors, with self-report measures completed again at 3- and 6-month follow-ups. The clinician and patient provided risk estimates of that patient making a suicide attempt within the next 6 months. Results showed that among current attempters, the d/s-IAT differentiated between first time and multiple attempters; with multiple attempters having significantly weaker self-associations with life relative to death. The d/s-IAT was associated with concurrent suicidal ideation and zest for life, but only predicted the desire to die prospectively at 3 months. By contrast, clinician and patient estimates predicted suicide risk at 3- and 6-month follow-up, with clinician estimates predicting death-promoting factors, and only patient estimates predicting life-sustaining factors. The utility of the d/s-IAT was more pronounced in the assessment of concurrent risk. Prospectively, clinician and patient predictions complemented each other in predicting suicide risk and resilience, respectively. Our findings indicate collaborative rather than implicit approaches add greater value to the management of risk and recovery in suicidal patients. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  19. Methodology of environmental risk assessment management

    Directory of Open Access Journals (Sweden)

    Saša T. Bakrač

    2012-04-01

    Full Text Available Successful protection of environment is mostly based on high-quality assessment of potential and present risks. Environmental risk management is a complex process which includes: identification, assessment and control of risk, namely taking measures in order to minimize the risk to an acceptable level. Environmental risk management methodology: In addition to these phases in the management of environmental risk, appropriate measures that affect the reduction of risk occurrence should be implemented: - normative and legal regulations (laws and regulations, - appropriate organizational structures in society, and - establishing quality monitoring of environment. The emphasis is placed on the application of assessment methodologies (three-model concept, as the most important aspect of successful management of environmental risk. Risk assessment methodology - European concept: The first concept of ecological risk assessment methodology is based on the so-called European model-concept. In order to better understand this ecological risk assessment methodology, two concepts - hazard and risk - are introduced. The European concept of environmental risk assessment has the following phases in its implementation: identification of hazard (danger, identification of consequences (if there is hazard, estimate of the scale of consequences, estimate of consequence probability and risk assessment (also called risk characterization. The European concept is often used to assess risk in the environment as a model for addressing the distribution of stressors along the source - path - receptor line. Risk assessment methodology - Canadian concept: The second concept of the methodology of environmental risk assessment is based on the so-called Canadian model-concept. The assessment of ecological risk includes risk arising from natural events (floods, extreme weather conditions, etc., technological processes and products, agents (chemical, biological, radiological, etc

  20. Application of probabilistic risk assessment to nuclear fuel reprocessing at the Savannah River Plant

    International Nuclear Information System (INIS)

    Durant, W.S.

    1980-01-01

    The Savannah River Laboratory has developed an integrated risk assessment methodology that has been applied to systems in the nuclear fuel reprocessing facilities at the Savannah River Plant. The methodology can be applied to several types of design and operational problems. Basically, the analysis is subdivided into individual modules that can be either utilized separately or integrated into an overall risk analysis. Computer codes and computer data banks are utilized extensively to minimize the manual effort. The flow of information begins with a definition of the system to be analyzed followed by an evaluation of sources of fault information, storage of this information in data banks, design analysis and data treatment, risk calculations, and end product options

  1. Environmental risk assessment and management of engineered nanomaterials - The role of ecotoxicity testing

    DEFF Research Database (Denmark)

    Hjorth, Rune

    replaced with a focus on in silico and in vitro studies with an even greater need for and reliance on extrapolation. However, in this thesis it is argued that within ecotoxicity, whole organism models remain at the foundation of environmental risk assessment, and as such, they are likely to remain in use...... will be available, it is important that tools encompassing uncertainty are utilized to facilitate decision-support. As the risk constituted by ENMs cannot be quantified, the use, need and ability of risk management options to encompass the potential risk are similarly challenged. This should invoke a precautionary...... to these is the continued examination of the applicability of ecotoxicity testing to encompass the testing of particles, as the tests originally are developed for dissolved chemicals. Furthermore, the ability of such testing to inform environmental risk assessment and environmental risk management, including...

  2. Strategic Risk Assessment

    Science.gov (United States)

    Derleth, Jason; Lobia, Marcus

    2009-01-01

    This slide presentation provides an overview of the attempt to develop and demonstrate a methodology for the comparative assessment of risks across the entire portfolio of NASA projects and assets. It includes information about strategic risk identification, normalizing strategic risks, calculation of relative risk score, and implementation options.

  3. Overview of risk assessment

    International Nuclear Information System (INIS)

    Rimington, J.D.

    1992-01-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits

  4. Overview of risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Rimington, J D [Health and Safety Executive (United Kingdom)

    1992-07-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits.

  5. The relevance of animal experimental results for the assessment of radiation genetic risks in man

    International Nuclear Information System (INIS)

    Stephan, G.

    1981-01-01

    No suitable data are available from man for the quantitative assessment of genetic radiation risk. Therefore, the results from experiments on animals must be utilized. Two hypotheses are presented here in drawing analogical conclusions from one species to another. Although the extrapolation of results from animal experiments remains an open question, the use of experimental results from mice seems to be justified for an assessment of the genetic radiation risk in man. (orig.) [de

  6. [Urban ecological risk assessment: a review].

    Science.gov (United States)

    Wang, Mei-E; Chen, Wei-Ping; Peng, Chi

    2014-03-01

    With the development of urbanization and the degradation of urban living environment, urban ecological risks caused by urbanization have attracted more and more attentions. Based on urban ecology principles and ecological risk assessment frameworks, contents of urban ecological risk assessment were reviewed in terms of driven forces, risk resources, risk receptors, endpoints and integrated approaches for risk assessment. It was suggested that types and degrees of urban economical and social activities were the driven forces for urban ecological risks. Ecological functional components at different levels in urban ecosystems as well as the urban system as a whole were the risk receptors. Assessment endpoints involved in changes of urban ecological structures, processes, functional components and the integrity of characteristic and function. Social-ecological models should be the major approaches for urban ecological risk assessment. Trends for urban ecological risk assessment study should focus on setting a definite protection target and criteria corresponding to assessment endpoints, establishing a multiple-parameter assessment system and integrative assessment approaches.

  7. [Forensic assessment of violence risk].

    Science.gov (United States)

    Pujol Robinat, Amadeo; Mohíno Justes, Susana; Gómez-Durán, Esperanza L

    2014-03-01

    Over the last 20 years there have been steps forward in the field of scientific research on prediction and handling different violent behaviors. In this work we go over the classic concept of "criminal dangerousness" and the more current of "violence risk assessment". We analyze the evolution of such assessment from the practice of non-structured clinical expert opinion to current actuarial methods and structured clinical expert opinion. Next we approach the problem of assessing physical violence risk analyzing the HCR-20 (Assessing Risk for Violence) and we also review the classic and complex subject of the relation between mental disease and violence. One of the most problematic types of violence, difficult to assess and predict, is sexual violence. We study the different actuarial and sexual violence risk prediction instruments and in the end we advise an integral approach to the problem. We also go through partner violence risk assessment, describing the most frequently used scales, especially SARA (Spouse Assault Risk Assessment) and EPV-R. Finally we give practical advice on risk assessment, emphasizing the importance of having maximum information about the case, carrying out a clinical examination, psychopathologic exploration and the application of one of the described risk assessment scales. We'll have to express an opinion about the dangerousness/risk of future violence from the subject and some recommendations on the conduct to follow and the most advisable treatment. Copyright © 2014 Elsevier España, S.L. All rights reserved.

  8. Venous Thromboembolism – Risk Assessment Tool and Thromboprophylaxis Policy: A National Survey

    LENUS (Irish Health Repository)

    Khan, MI

    2017-01-01

    Venous Thromboembolic (VTE) events in hospitalised patients are associated with significant mortality and morbidity and a major economic burden on the health service. It is well established in the literature that active implementation of a mandatory risk assessment tool and thromboprophylaxis policy reduces the incidence of hospital associated thrombosis (HAT). This study examines the utilization of a VTE risk assessment tool and thromboprophylaxis (TP) policy in Irish hospitals that manage acute admissions. A national survey was distributed to forty acute hospitals throughout Ireland. The response rate was 78% (31\\/40). The results showed that only 26% (n=8\\/31) of acute hospitals in Ireland have a local implemented TP policy. Six (75%) of these eight had a risk assessment tool in conjunction with the TP policy. All respondents who did not report to have a TP policy and risk assessment tool agreed that they should implement VTE prevention policy at their hospital. Based on the data from this survey and evidence from the effectiveness of the VTE prevention programme introduced in the United Kingdom, there is a need for a national risk assessment and thromboprophylaxis policy in Ireland. This change in practice would have the potential to prevent or reduce the morbidity and mortality associated with hospital acquired thrombosis

  9. Comparison of seismic margin assessment and probabilistic risk assessment in seismic IPE

    International Nuclear Information System (INIS)

    Reed, J.W.; Kassawara, R.P.

    1993-01-01

    A comparison of technical requirements and managerial issues between seismic margin assessment (SMA) and seismic probabilistic risk assessment (SPRA) in a seismic Individual Plant Examination (IPE) is presented and related to requirements for an Unresolved Safety Issue (USI) A-46 review which is required for older nuclear power plants. Advantages and disadvantages are discussed for each approach. Technical requirements reviewed for a seismic IPE include: scope of plants covered, seismic input, scope of review, selection of equipment, required experience and training of engineers, walkdown procedure, evaluation of components, relay review, containment review, quality assurance, products, documentation requirements, and closure procedure. Managerial issues discussed include regulatory acceptability, compatibility with seismic IPE, compliance with seismic IPE requirements, ease of use by utilities, and relative cost

  10. Risk Assessment and Integration Team (RAIT) Portfolio Risk Analysis Strategy

    Science.gov (United States)

    Edwards, Michelle

    2010-01-01

    Impact at management level: Qualitative assessment of risk criticality in conjunction with risk consequence, likelihood, and severity enable development of an "investment policy" towards managing a portfolio of risks. Impact at research level: Quantitative risk assessments enable researchers to develop risk mitigation strategies with meaningful risk reduction results. Quantitative assessment approach provides useful risk mitigation information.

  11. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  12. Organ utilization from increased infectious risk donors: An observational study.

    Science.gov (United States)

    L'Huillier, Arnaud G; Humar, Atul; Payne, Clare; Kumar, Deepali

    2017-12-01

    Donors with an increased risk of transmitting human immunodeficiency virus (HIV), hepatitis B virus (HBV), or hepatitis C virus (HCV) (increased risk donors [IRDs]) are a potential source of organs for transplant. Organs from IRDs can be utilized with appropriate recipient consent and post-transplant follow-up. We reviewed the characteristics and utilization of IRDs in our Organ Procurement Organization (OPO) over a 2-year period. Donor information from April 1, 2013 to March 31, 2015 was obtained through the OPO database. Only consented donors were included. Donors were categorized as IRDs according to Health Canada/Canadian Standards Association (CSA) criteria. A total of 494 potential donors were identified, of which 92 (18.6%) were IRDs. Of these, at least one organ was transplanted from 76 (82.6%). Risk factors for IRDs included injection drug user (IDU) (12%), men having sex with men (MSM) (7%), commercial sex worker (CSW) (4%), and incarceration (24%). Fifty-nine percent (253/429) of IRD organs were utilized. The most frequently used organ was kidney, followed by liver. Median number of organs recovered per IRD was 3 (interquartile range: 2-5). Nucleic acid testing (NAT) was performed in 18.5% (17/92) of IRDs. Reasons for NAT were IDU (n = 2), MSM (n = 2), CSW (n = 2), and previous incarceration (n = 7). Organ utilization from donors that had NAT was similar to donors who did not (94% vs 80%, P = .29). Follow-up NAT was done in multiple factors contribute to the perception of infectious risk from such organs. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  13. Improving nursing students' assessment of fall risk in community-dwelling older adults.

    Science.gov (United States)

    Patton, Susan K

    2016-12-09

    Nationally, approximately one third of older adults fall each year. Falls and resulting injury result in decreased mobility, functional impairment, loss of independence, and increased mortality. Utilization of evidence-based protocols by health care providers to identify older adults at risk of falling is limited, and rates of participation by older adults in prevention activities is low. Because of nursing's increasing role in caring for older adults, development of fall prevention education for nursing students would result in increased awareness of the need for fall prevention in community-dwelling older adults and increased access of older adults to falls risk assessment. There is a need to extend research to inform teaching and learning strategies for fall prevention. After pretesting, a convenience sample of 52 undergraduate nursing students and 22 graduate nursing students completed an online education program and performed a falls risk assessment on an older adult. After completing the clinical assignment, students completed a posttest and self-efficacy survey. Data were analyzed using multivariate statistical tests. Results revealed an increase in knowledge and student self-reporting of efficacy of fall risk assessment skills for the older adult population. This study suggests that nursing students acquired the necessary knowledge and self-efficacy for assessing fall risk of older adults through the combination of an online learning module and participating in actual fall risk assessment of an older adult.

  14. Stochastic optimization under risk constraint and utility functions

    International Nuclear Information System (INIS)

    Seck, B.

    2008-09-01

    In a context of concurrence and emergence of energy markets, the production of electricity is affected by the new sources of risks which are the price variations on the energy markets. These new sources of risks generate a new risk: the market risk. In this research, the author explores the possibility of introducing constraints, expressed by measurements of risk, into the process of optimization of electricity production when financial contracts are signed on the energy market. The author makes the distinction between the engineering approach (taking the risk into account by risk measurements) and the economist approach (taking the risk into account by utility functions). After an overview of these both approaches in a static framework, he gives an economical formulation (a Maccheroni type one) for a static optimization problem under a risk constraint when the risk measurement is written under the form of an expected infimum like the variance, the 'conditional value at risk', and so on. The obtained results are then extended to a dynamic optimization framework under risk constraints. A numerical application of this approach is presented to solve a problem of electricity production management under a constraint of 'conditional value at risk' on a middle term

  15. Hybrid data mining-regression for infrastructure risk assessment based on zero-inflated data

    International Nuclear Information System (INIS)

    Guikema, S.D.; Quiring, S.M.

    2012-01-01

    Infrastructure disaster risk assessment seeks to estimate the probability of a given customer or area losing service during a disaster, sometimes in conjunction with estimating the duration of each outage. This is often done on the basis of past data about the effects of similar events impacting the same or similar systems. In many situations this past performance data from infrastructure systems is zero-inflated; it has more zeros than can be appropriately modeled with standard probability distributions. The data are also often non-linear and exhibit threshold effects due to the complexities of infrastructure system performance. Standard zero-inflated statistical models such as zero-inflated Poisson and zero-inflated negative binomial regression models do not adequately capture these complexities. In this paper we develop a novel method that is a hybrid classification tree/regression method for complex, zero-inflated data sets. We investigate its predictive accuracy based on a large number of simulated data sets and then demonstrate its practical usefulness with an application to hurricane power outage risk assessment for a large utility based on actual data from the utility. While formulated for infrastructure disaster risk assessment, this method is promising for data-driven analysis for other situations with zero-inflated, complex data exhibiting response thresholds.

  16. Patient caries risk assessment

    DEFF Research Database (Denmark)

    Twetman, Svante; Fontana, Margherita

    2009-01-01

    Risk assessment is an essential component in the decision-making process for the correct prevention and management of dental caries. Multiple risk factors and indicators have been proposed as targets in the assessment of risk of future disease, varying sometimes based on the age group at which...... they are targeted. Multiple reviews and systematic reviews are available in the literature on this topic. This chapter focusses primarily on results of reviews based on longitudinal studies required to establish the accuracy of caries risk assessment. These findings demonstrate that there is a strong body...... of evidence to support that caries experience is still, unfortunately, the single best predictor for future caries development. In young children, prediction models which include a variety of risk factors seem to increase the accuracy of the prediction, while the usefulness of additional risk factors...

  17. Building better environmental risk assessments

    Directory of Open Access Journals (Sweden)

    Raymond eLayton

    2015-08-01

    Full Text Available Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERA for genetically modified (GM crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems – examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data, and adapting advances in risk analysis from other relevant disciplines.

  18. Building Better Environmental Risk Assessments

    Science.gov (United States)

    Layton, Raymond; Smith, Joe; Macdonald, Phil; Letchumanan, Ramatha; Keese, Paul; Lema, Martin

    2015-01-01

    Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision-making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERAs) for genetically modified (GM) crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems – examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data), and adapting advances in risk analysis from other relevant disciplines. PMID:26301217

  19. Building Better Environmental Risk Assessments.

    Science.gov (United States)

    Layton, Raymond; Smith, Joe; Macdonald, Phil; Letchumanan, Ramatha; Keese, Paul; Lema, Martin

    2015-01-01

    Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision-making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERAs) for genetically modified (GM) crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems - examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data), and adapting advances in risk analysis from other relevant disciplines.

  20. Risk Assessment Stability: A Revalidation Study of the Arizona Risk/Needs Assessment Instrument

    Science.gov (United States)

    Schwalbe, Craig S.

    2009-01-01

    The actuarial method is the gold standard for risk assessment in child welfare, juvenile justice, and criminal justice. It produces risk classifications that are highly predictive and that may be robust to sampling error. This article reports a revalidation study of the Arizona Risk/Needs Assessment instrument, an actuarial instrument for juvenile…

  1. Utility of TICS-M for the assessment of cognitive function in older adults.

    Science.gov (United States)

    de Jager, Celeste A; Budge, Marc M; Clarke, Robert

    2003-04-01

    Routine screening of high-risk elderly people for early cognitive impairment is constrained by the limitations of currently available cognitive function tests. The Telephone Interview of Cognitive Status is a novel instrument for assessment of cognitive function that can be administered in person or by telephone. To evaluate the determinants and utility of TICS-M (13-item modified version) for assessment of cognitive function in healthy elderly people. The utility of TICS-M was compared with more widely used MMSE and CAMCOG in a cross-sectional survey of 120 older (62 to 89 years) UK adults. The TICS-M cognitive test scores (27.97, SD 4.15) were normally distributed in contrast with those for MMSE and CAMCOG that had a negatively skewed distribution. TICS-M scores were inversely correlated with age (r = -0.21) and with the NART fullscale IQ (r = -0.35), but were independent of years of education in this cohort. TICS-M was highly correlated with MMSE (r = 0.57) and with CAMCOG (r = 0.62) scores. The time required to complete the test is comparable to MMSE and substantially less than CAMCOG. The normal distribution of TICS-M test scores suggest that this test is less constrained by the ceiling effect which limits the utility of MMSE and CAMCOG test scores in detecting early cognitive impairment. TICS-M is an appropriate instrument to assess cognitive function in both research and in clinical practice. Copyright 2003 John Wiley & Sons, Ltd.

  2. Risk Assessment of Power System considering the CPS of Transformers

    Science.gov (United States)

    Zhou, Long; Peng, Zewu; Liu, Xindong; Li, Canbing; Chen, Can

    2018-02-01

    This paper constructs a risk assessment framework of power system for device-level information security, analyzes the typical protection configuration of power transformers, and takes transformer gas protection and differential protection as examples to put forward a method that analyzes the cyber security in electric power system, which targets transformer protection parameters. We estimate the risk of power system accounting for the cyber security of transformer through utilizing Monte Carlo method and two indexes, which are the loss of load probability and the expected demand not supplied. The proposed approach is tested with IEEE 9 bus system and IEEE 118 bus system.

  3. Biological effects of static magnetic fields: a selective review with emphasis on risk assessment

    International Nuclear Information System (INIS)

    Easterly, C.E.

    1982-04-01

    Rather than focusing on literature per se, the current study determines the status of magnetic field information that is applicable to risk assessment. Hence, an attempt is made to identify both the literature that is useful to the goal of risk assessment and a framework within which risk assessment methodologies can be derived. From this selected review, it is concluded that three areas exist for which adequate information can be found to begin modelling: disease induction, reproduction and development, and cardiovascular response. The first two are supported by a combination of positive and negative findings and the last by a calculational technique which utilizes the physically well-known principle of flow retardation for a conducting fluid moving through a magnetic field

  4. Biological effects of static magnetic fields: a selective review with emphasis on risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Easterly, C. E.

    1982-04-01

    Rather than focusing on literature per se, the current study determines the status of magnetic field information that is applicable to risk assessment. Hence, an attempt is made to identify both the literature that is useful to the goal of risk assessment and a framework within which risk assessment methodologies can be derived. From this selected review, it is concluded that three areas exist for which adequate information can be found to begin modelling: disease induction, reproduction and development, and cardiovascular response. The first two are supported by a combination of positive and negative findings and the last by a calculational technique which utilizes the physically well-known principle of flow retardation for a conducting fluid moving through a magnetic field.

  5. Nonlinear Uncertainty Propagation of Satellite State Error for Tracking and Conjunction Risk Assessment

    Science.gov (United States)

    2017-12-18

    AFRL-RV-PS- AFRL-RV-PS- TR-2017-0177 TR-2017-0177 NONLINEAR UNCERTAINTY PROPAGATION OF SATELLITE STATE ERROR FOR TRACKING AND CONJUNCTION RISK...Uncertainty Propagation of Satellite State Error for Tracking and Conjunction Risk Assessment 5a. CONTRACT NUMBER FA9453-16-1-0084 5b. GRANT NUMBER...prediction and satellite conjunction analysis. Statistical approach utilizes novel methods to build better uncertainty state characterization in the context

  6. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  7. Use of screening techniques to reduce uncertainty in risk assessment at a former manufactured gas plant site

    International Nuclear Information System (INIS)

    Logan, C.M.; Walden, R.H.; Baker, S.R.; Pekar, Z.; LaKind, J.S.; MacFarlane, I.D.

    1995-01-01

    Preliminary analysis of risks from a former manufactured gas plant (MGP) site revealed six media associated with potential exposure pathways: soils, air, surface water, groundwater, estuarine sediments, and aquatic biota. Contaminants of concern (COCs) include polycyclic aromatic hydrocarbons, volatile organic hydrocarbons, metals, cyanide, and PCBs. Available chemical data, including site-specific measurements and existing data from other sources (e.g., agency monitoring programs, Chesapeake Bay Program), were evaluated for potential utility in risk assessment. Where sufficient data existed, risk calculations were performed using central tendency and reasonable maximum exposure estimates. Where site-specific data were not available, risks were estimated using conservatively high default assumptions for dose and/or exposure duration. Because of the large number of potential exposure pathways and COCs, a sensitivity analysis was conducted to determine which information most influences risk assessment outcome so that any additional data collection to reduce uncertainty can be cost-effectively targeted. The sensitivity analysis utilized two types of information: (1) the impact that uncertainty in risk input values has on output risk estimates, and (2) the potential improvement in key risk input values, and consequently output values, if better site-specific data were available. A decision matrix using both quantitative and qualitative information was developed to prioritize sampling strategies to minimize uncertainty in the final risk assessment

  8. Track 6: safety and risk management. Plant operational risk management. Plant Configuration Risk Assessment Methodology Development for Periodic Maintenance

    International Nuclear Information System (INIS)

    Yang, Huichang; Chung, Chang Hyun; Sung, Key Yong

    2001-01-01

    As the operation experiences of nuclear power plants (NPPs) in Korea accumulate and NPP safety functions become enhanced, the role of stable and optimal NPP operation within acceptable safety criteria becomes important at present. To accomplish the goal of safe and optimal operation, maintenance and its related activities should be regarded as the issues of most concern. Studies of methodologies for maintenance improvement and optimization have focused on system performance rather than on the hardware itself. From this point of view, the probabilistic methods are most useful. In terms of risk including core damage frequency and unavailability, the cause that might impact plant safety during normal maintenance activities can be identified and evaluated effectively. The results from these probabilistic analyses can provide insightful information for the reallocation of risk-contributing maintenance activity. This information can be utilized in a way that separates the significant risk-contributing maintenance activities from each other unless they are timely related. In Korea, the risk-monitoring program for operating NPPs is under development and will be implemented in 2003. To accomplish the risk-monitoring program objectives, suitable risk evaluation methods should be developed before the implementation of the risk-monitoring program. The plant configuration assessment methodology was developed for these reasons, and this method is to incorporate the field experiences into the risk calculation exactly within the limit of probabilistic methods. During normal plant operation, the plant operational risk changes frequently depending on the status of the plant system and the arrangement of the components. Specific plant systems or components are typically removed from service because of random equipment failure, planned preventive/predictive maintenance, corrective maintenance, surveillance testing, and operational bypass activities, and such events usually impact the

  9. Variations of emission characterization of PAHs emitted from different utility boilers of coal-fired power plants and risk assessment related to atmospheric PAHs

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Ruwei [CAS Key Laboratory of Crust-Mantle and the Environment, School of Earth and Space Sciences, University of Science and Technology of China, Hefei, Anhui (China); State Key Laboratory of Loess and Quaternary Geology, Institute of Earth Environment, The Chinese Academy of Sciences, Xi' an 710075, Shanxi (China); Liu, Guijian, E-mail: lgj@ustc.edu.cn [CAS Key Laboratory of Crust-Mantle and the Environment, School of Earth and Space Sciences, University of Science and Technology of China, Hefei, Anhui (China); State Key Laboratory of Loess and Quaternary Geology, Institute of Earth Environment, The Chinese Academy of Sciences, Xi' an 710075, Shanxi (China); Zhang, Jiamei [CAS Key Laboratory of Crust-Mantle and the Environment, School of Earth and Space Sciences, University of Science and Technology of China, Hefei, Anhui (China)

    2015-12-15

    Coal-fired power plants (CFPPs) represent important source of atmospheric PAHs, however, their emission characterization are still largely unknown. In this work, the concentration, distribution and gas-particle partitioning of PM{sub 10}- and gas-phase PAHs in flue gas emitted from different coal-fired utility boilers were investigated. Moreover, concentration and distribution in airborne PAHs from different functional areas of power plants were studied. People's inhalatory and dermal exposures to airborne PAHs at these sites were estimated and their resultant lung cancer and skin cancer risks were assessed. Results indicated that the boiler capacity and operation conditions have significant effect on PAH concentrations in both PM{sub 10} and gas phases due to the variation of combustion efficiency, whereas they take neglected effect on PAH distributions. The wet flue gas desulphurization (WFGD) takes significant effect on the scavenging of PAH in both PM{sub 10} and gas phases, higher scavenging efficiency were found for less volatile PAHs. PAH partitioning is dominated by absorption into organic matter and accompanied by adsorption onto PM{sub 10} surface. In addition, different partitioning mechanism is observed for individual PAHs, which is assumed arising from their chemical affinity and vapor pressure. Risk assessment indicates that both inhalation and dermal contact greatly contribute to the cancer risk for CFPP workers and nearby residents. People working in workshop are exposed to greater inhalation and dermal exposure risk than people living in nearby vicinity and working office. - Highlights: • PAH distribution in PM{sub 10} and gas phases primarily depend on the vapor pressure. • Combustion conditions and WFGD show typical effects on PAH level and profile. • PAH partitioning is dominated by absorption and also accompanied by adsorption. • Individual PAHs show different partitioning mechanisms in PM{sub 10}- and gas-phases. • People in

  10. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  11. Online application of a risk management system for risk assessment and monitoring at NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun, E-mail: youngjun51@hotmail.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Yang, Ming, E-mail: yangming@hrbeu.edu.cn [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Wang, Wenlin, E-mail: wlwang0618@126.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Li, Fengjun, E-mail: leefengjun@163.com [China Nuclear Power Engineering Co. Ltd (China)

    2016-08-15

    Highlights: • A generic GO-FLOW modeling structure is proposed for easily Living PSA development and analysis. • Hierarchical and modularized scheme is applied in the development of Living PSA models and database. • A risk management system is developed by GO-FLOW method. • Functional testing is conducted on the risk management system for performance evaluation. • The fast solution time derived from Living PSA application is supportive in plant safety management. - Abstract: The paper presents a risk management system on the basis of Living PSA models which are developed under a proposed generic GO-FLOW modeling method with a hierarchical and modular structure. The design of the risk management system is aiming at assisting plant personnel to manage maintenance plan and system configuration, and conduct system reliability monitoring, risk monitoring and risk management quickly and conveniently through graphical user interfaces without going deep into the details of building, updating and analyzing reliability and risk models. The performance of the proposed risk management system was tested on a full-scale simulator of PWR nuclear power plant and demonstrated that the fast solution time derived from utilization of hierarchical and modularized Living PSA models is strongly supportive for instantaneous risk assessment as well as for daily risk management at NPPs.

  12. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Wiser, Ryan

    2005-08-10

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  13. Risk assessment of 30 MeV cyclotron facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Gyo Seong; Lee, Jin Woo [Advanced Radiation Technology Institute, Korea Atomic Energy Research Institute, Jeongeup (Korea, Republic of); Kim, Chong Yeal [Dept. of Radiation Science and Technology, Chonbuk National University, Jeonju (Korea, Republic of)

    2017-03-15

    A cyclotron is a kind of particle accelerator that produces a beam of charged particles for the production of medical, industrial, and research radioisotopes. More than 30 cyclotrons are operated in Korea to produce 18F, an FDG synthesis at hospitals. A 30-MeV cyclotron was installed at ARTI (Advanced Radiation Technology Institute, KAERI) mainly for research regarding isotope production. In this study, we analyze and estimate the items of risk such as the problems in the main components of the cyclotron, the loss of radioactive materials, the leakage of coolant, and the malfunction of utilities, fres and earthquakes. To estimate the occurrence frequency in an accident risk assessment, five levels, i.e., Almost certain, Likely, Possible, Unlikely, and Rare, are applied. The accident consequence level is classified under four grades based on the annual permissible dose for radiation workers and the public in the nuclear safety law. The analysis of the accident effect is focused on the radioactive contamination caused by radioisotope leakage and radioactive material leakage of a ventilation filter due to a free. To analyze the risks, Occupation Safety and Health Acts is applied. In addition, action plans against an accident were prepared after a deep discussion among relevant researchers. In this acts, we will search for hazard and introduce the risk assessment for the research 30-MeV cyclotron facilities of ARTI.

  14. Risk assessment of 30 MeV cyclotron facilities

    International Nuclear Information System (INIS)

    Jeong, Gyo Seong; Lee, Jin Woo; Kim, Chong Yeal

    2017-01-01

    A cyclotron is a kind of particle accelerator that produces a beam of charged particles for the production of medical, industrial, and research radioisotopes. More than 30 cyclotrons are operated in Korea to produce 18F, an FDG synthesis at hospitals. A 30-MeV cyclotron was installed at ARTI (Advanced Radiation Technology Institute, KAERI) mainly for research regarding isotope production. In this study, we analyze and estimate the items of risk such as the problems in the main components of the cyclotron, the loss of radioactive materials, the leakage of coolant, and the malfunction of utilities, fres and earthquakes. To estimate the occurrence frequency in an accident risk assessment, five levels, i.e., Almost certain, Likely, Possible, Unlikely, and Rare, are applied. The accident consequence level is classified under four grades based on the annual permissible dose for radiation workers and the public in the nuclear safety law. The analysis of the accident effect is focused on the radioactive contamination caused by radioisotope leakage and radioactive material leakage of a ventilation filter due to a free. To analyze the risks, Occupation Safety and Health Acts is applied. In addition, action plans against an accident were prepared after a deep discussion among relevant researchers. In this acts, we will search for hazard and introduce the risk assessment for the research 30-MeV cyclotron facilities of ARTI

  15. Cardiovascular risk assessment in the treatment of nonalcoholic steatohepatitis: a secondary analysis of the MOZART trial.

    Science.gov (United States)

    Lin, Steven C; Ang, Brandon; Hernandez, Carolyn; Bettencourt, Ricki; Jain, Rashmi; Salotti, Joanie; Richards, Lisa; Kono, Yuko; Bhatt, Archana; Aryafar, Hamed; Lin, Grace Y; Valasek, Mark A; Sirlin, Claude B; Brouha, Sharon; Loomba, Rohit

    2016-03-01

    Nonalcoholic steatohepatitis (NASH) is associated with increased cardiovascular risk and mortality. No US Food and Drug Administration (FDA) approved therapies for NASH are available; clinical trials to date have not yet systematically assessed for changes in cardiovascular risk. This study examines the prospective utility of cardiovascular risk assessments, the Framingham risk score (FRS) and coronary artery calcium (CAC) score, as endpoints in a NASH randomized clinical trial, and assesses whether histologic improvements lead to lower cardiovascular risk. Secondary analysis of a 24-week randomized, double-blind, placebo-controlled trial (MOZART) in which 50 biopsy-proven NASH patients received oral ezetimibe 10 mg daily (n = 25) versus placebo (n = 25). Biochemical profiling, FRS, CAC scores, liver biopsies were obtained at baseline and endpoint. Ezetimibe improved FRS whereas placebo did not (4.4 ± 6.2 to 2.9 ± 4.8, p = 0.038; 3.0 ± 4.4 to 2.9 ± 4.2, p = 0.794). CAC scores did not change with ezetimibe or placebo (180.4 ± 577.2 to 194.1 ± 623.9, p = 0.293; 151.4 ± 448.9 to 183.3 ± 555.7, p = 0.256). Ezetimibe improved FRS and CAC scores in more patients than placebo (48% versus 23%, p = 0.079, and 21% versus 0%, p = 0.090, respectively), though not significantly. No differences were noted in cardiovascular risk scores among histologic responders versus nonresponders. Ezetimibe improved FRS whereas placebo did not. FRS and CAC scores improved in a greater proportion of patients with ezetimibe; this trend did not reach significance. These findings indicate the utility and feasibility of monitoring cardiovascular risk in a NASH trial. The utility of CAC scores may be higher in trials of longer duration (⩾52 weeks) and with older patients (age ⩾45). ClinicalTrials.gov registration: NCT01766713.

  16. Risk assessment: 'A consumer's perspective'

    International Nuclear Information System (INIS)

    Waterhouse, Rachel

    1992-01-01

    The paper assesses the concept of risk, risk assessment and tolerability of risk from consumer point of view. Review of existing UK and EC directives on certain products and appliances is also covered

  17. Risk assessment: 'A consumer's perspective'

    Energy Technology Data Exchange (ETDEWEB)

    Waterhouse, Rachel [Consumer' s Association, Health and Safety Commission (United Kingdom)

    1992-07-01

    The paper assesses the concept of risk, risk assessment and tolerability of risk from consumer point of view. Review of existing UK and EC directives on certain products and appliances is also covered.

  18. Assessing Somatosensory Utilization during Unipedal Postural Control.

    Science.gov (United States)

    Goel, Rahul; De Dios, Yiri E; Gadd, Nichole E; Caldwell, Erin E; Peters, Brian T; Reschke, Millard F; Bloomberg, Jacob J; Oddsson, Lars I E; Mulavara, Ajitkumar P

    2017-01-01

    Multisensory-visual, vestibular and somatosensory information is integrated for appropriate postural control. The primary goal of this study was to assess somatosensory utilization during a functional motor task of unipedal postural control, in normal healthy adults. Assessing individual bias in the utilization of individual sensory contributions during postural control may help customization of rehabilitation protocols. In this study, a test paradigm of unipedal stance control in supine orientation with and without vision was assessed. Postural control in this test paradigm was hypothesized to utilize predominantly contributions of somatosensory information from the feet and ankle joint, with minimal vestibular input. Fourteen healthy subjects "stood" supine on their dominant leg while strapped to a backpack frame that was freely moving on air-bearings, to remove available otolith tilt cues with respect to gravity that influences postural control when standing upright. The backpack was attached through a cable to a pneumatic cylinder that provided a gravity-like load. Subjects performed three trials each with Eyes-open (EO) and Eyes-closed (EC) while loaded with 60% body weight. There was no difference in unipedal stance time (UST) across the two conditions with EC condition challenging the postural control system greater than the EO condition. Stabilogram-diffusion analysis (SDA) indicated that the critical mean square displacement was significantly different between the two conditions. Vestibular cues, both in terms of magnitude and the duration for which relevant information was available for postural control in this test paradigm, were minimized. These results support our hypothesis that maintaining unipedal stance in supine orientation without vision, minimizes vestibular contribution and thus predominantly utilizes somatosensory information for postural control.

  19. Using risk assessment in periodontics.

    Science.gov (United States)

    Woodman, Alan J

    2014-08-01

    Risk assessment has become a regular feature in both dental practice and society as a whole, and principles used to assess risk in society are similar to those used in a clinical setting. Although the concept of risk assessment as a prognostic indicator for periodontal disease incidence and activity is well established in the management of periodontitis, the use of risk assessment to manage the practical treatment of periodontitis and its sequelae appears to have less foundation. A simple system of initial risk assessment - building on the use of the Basic Periodontal Examination (BPE), clinical, medical and social factors - is described, linked to protocols for delivering care suited to general dental practice and stressing the role of long-term supportive care. The risks of not treating the patient are considered, together with the possible causes of failure, and the problems of successful treatment are illustrated by the practical management of post-treatment recession.

  20. A total risk assessment methodology for security assessment

    International Nuclear Information System (INIS)

    Auilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

    2009-01-01

    Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a

  1. An influence diagram for urban flood risk assessment through pluvial flood hazards under non-stationary conditions

    DEFF Research Database (Denmark)

    Åström, Helena Lisa Alexandra; Friis Hansen, P.; Garrè, Luca

    2014-01-01

    Urban flooding introduces significant risk to society. Non-stationarity leads to increased uncertainty and this is challenging to include in actual decision-making. The primary objective of this study was to develop a risk assessment and decision support framework for pluvial urban flood risk under...... non-stationary conditions using an influence diagram (ID) which is a Bayesian network (BN) extended with decision and utility nodes. Non-stationarity is considered to be the influence of climate change where extreme precipitation patterns change over time. The overall risk is quantified in monetary...... terms expressed as expected annual damage. The network is dynamic in as much as it assesses risk at different points in time. The framework provides means for decision-makers to assess how different decisions on flood adaptation affect the risk now and in the future. The result from the ID was extended...

  2. The Role of Alternative Testing Strategies in Environmental Risk Assessment of Engineered Nanomaterials

    DEFF Research Database (Denmark)

    Hjorth, Rune; Holden, Patricia; Hansen, Steffen Foss

    2017-01-01

    ) workshop in Washington, D.C. and serves as the point of depature for this paper. Here we present the main outcomes by describing and defining the use of ATS for ENMs as well as discussing its future role in environmental risk science. We conclude that diversity in testing should be encouraged to avoid...... chemicals are challenged. Nonetheless, standardized whole organism animal testing is still considered the gold standard for environmental risk assessment. Advancing risk analysis of engineered nanomaterials (ENMs) through ATS was discussed in September 2014 at an international Society for Risk Analysis (SRA...... be utilized to skip uncertain environmental extrapolations and give rise to more accurate risk analysis....

  3. An Integrated Risk Index Model Based on Hierarchical Fuzzy Logic for Underground Risk Assessment

    Directory of Open Access Journals (Sweden)

    Muhammad Fayaz

    2017-10-01

    Full Text Available Available space in congested cities is getting scarce due to growing urbanization in the recent past. The utilization of underground space is considered as a solution to the limited space in smart cities. The numbers of underground facilities are growing day by day in the developing world. Typical underground facilities include the transit subway, parking lots, electric lines, water supply and sewer lines. The likelihood of the occurrence of accidents due to underground facilities is a random phenomenon. To avoid any accidental loss, a risk assessment method is required to conduct the continuous risk assessment and report any abnormality before it happens. In this paper, we have proposed a hierarchical fuzzy inference based model for under-ground risk assessment. The proposed hierarchical fuzzy inference architecture reduces the total number of rules from the rule base. Rule reduction is important because the curse of dimensionality damages the transparency and interpretation as it is very tough to understand and justify hundreds or thousands of fuzzy rules. The computation time also increases as rules increase. The proposed model takes 175 rules having eight input parameters to compute the risk index, and the conventional fuzzy logic requires 390,625 rules, having the same number of input parameters to compute risk index. Hence, the proposed model significantly reduces the curse of dimensionality. Rule design for fuzzy logic is also a tedious task. In this paper, we have also introduced new rule schemes, namely maximum rule-based and average rule-based; both schemes can be used interchangeably according to the logic needed for rule design. The experimental results show that the proposed method is a virtuous choice for risk index calculation where the numbers of variables are greater.

  4. Supporting Risk Assessment: Accounting for Indirect Risk to Ecosystem Components.

    Directory of Open Access Journals (Sweden)

    Cathryn Clarke Murray

    Full Text Available The multi-scalar complexity of social-ecological systems makes it challenging to quantify impacts from human activities on ecosystems, inspiring risk-based approaches to assessments of potential effects of human activities on valued ecosystem components. Risk assessments do not commonly include the risk from indirect effects as mediated via habitat and prey. In this case study from British Columbia, Canada, we illustrate how such "indirect risks" can be incorporated into risk assessments for seventeen ecosystem components. We ask whether (i the addition of indirect risk changes the at-risk ranking of the seventeen ecosystem components and if (ii risk scores correlate with trophic prey and habitat linkages in the food web. Even with conservative assumptions about the transfer of impacts or risks from prey species and habitats, the addition of indirect risks in the cumulative risk score changes the ranking of priorities for management. In particular, resident orca, Steller sea lion, and Pacific herring all increase in relative risk, more closely aligning these species with their "at-risk status" designations. Risk assessments are not a replacement for impact assessments, but-by considering the potential for indirect risks as we demonstrate here-they offer a crucial complementary perspective for the management of ecosystems and the organisms within.

  5. Range-finding risk assessment of inhalation exposure to nanodiamonds in a laboratory environment.

    Science.gov (United States)

    Koivisto, Antti J; Palomäki, Jaana E; Viitanen, Anna-Kaisa; Siivola, Kirsi M; Koponen, Ismo K; Yu, Mingzhou; Kanerva, Tomi S; Norppa, Hannu; Alenius, Harri T; Hussein, Tareq; Savolainen, Kai M; Hämeri, Kaarle J

    2014-05-16

    This study considers fundamental methods in occupational risk assessment of exposure to airborne engineered nanomaterials. We discuss characterization of particle emissions, exposure assessment, hazard assessment with in vitro studies, and risk range characterization using calculated inhaled doses and dose-response translated to humans from in vitro studies. Here, the methods were utilized to assess workers' risk range of inhalation exposure to nanodiamonds (NDs) during handling and sieving of ND powder. NDs were agglomerated to over 500 nm particles, and mean exposure levels of different work tasks varied from 0.24 to 4.96 µg·m(-3) (0.08 to 0.74 cm(-3)). In vitro-experiments suggested that ND exposure may cause a risk for activation of inflammatory cascade. However, risk range characterization based on in vitro dose-response was not performed because accurate assessment of delivered (settled) dose on the cells was not possible. Comparison of ND exposure with common pollutants revealed that ND exposure was below 5 μg·m(-3), which is one of the proposed exposure limits for diesel particulate matter, and the workers' calculated dose of NDs during the measurement day was 74 ng which corresponded to 0.02% of the modeled daily (24 h) dose of submicrometer urban air particles.

  6. Range-Finding Risk Assessment of Inhalation Exposure to Nanodiamonds in a Laboratory Environment

    Directory of Open Access Journals (Sweden)

    Antti J. Koivisto

    2014-05-01

    Full Text Available This study considers fundamental methods in occupational risk assessment of exposure to airborne engineered nanomaterials. We discuss characterization of particle emissions, exposure assessment, hazard assessment with in vitro studies, and risk range characterization using calculated inhaled doses and dose-response translated to humans from in vitro studies. Here, the methods were utilized to assess workers’ risk range of inhalation exposure to nanodiamonds (NDs during handling and sieving of ND powder. NDs were agglomerated to over 500 nm particles, and mean exposure levels of different work tasks varied from 0.24 to 4.96 µg·m−3 (0.08 to 0.74 cm−3. In vitro-experiments suggested that ND exposure may cause a risk for activation of inflammatory cascade. However, risk range characterization based on in vitro dose-response was not performed because accurate assessment of delivered (settled dose on the cells was not possible. Comparison of ND exposure with common pollutants revealed that ND exposure was below 5 μg·m−3, which is one of the proposed exposure limits for diesel particulate matter, and the workers’ calculated dose of NDs during the measurement day was 74 ng which corresponded to 0.02% of the modeled daily (24 h dose of submicrometer urban air particles.

  7. Risk Assessment and Decision-Making under Uncertainty in Tunnel and Underground Engineering

    Directory of Open Access Journals (Sweden)

    Yuanpu Xia

    2017-10-01

    Full Text Available The impact of uncertainty on risk assessment and decision-making is increasingly being prioritized, especially for large geotechnical projects such as tunnels, where uncertainty is often the main source of risk. Epistemic uncertainty, which can be reduced, is the focus of attention. In this study, the existing entropy-risk decision model is first discussed and analyzed, and its deficiencies are improved upon and overcome. Then, this study addresses the fact that existing studies only consider parameter uncertainty and ignore the influence of the model uncertainty. Here, focus is on the issue of model uncertainty and differences in risk consciousness with different decision-makers. The utility theory is introduced in the model. Finally, a risk decision model is proposed based on the sensitivity analysis and the tolerance cost, which can improve decision-making efficiency. This research can provide guidance or reference for the evaluation and decision-making of complex systems engineering problems, and indicate a direction for further research of risk assessment and decision-making issues.

  8. 24 CFR 35.315 - Risk assessment.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Risk assessment. 35.315 Section 35... Provided by a Federal Agency Other Than HUD § 35.315 Risk assessment. Each owner shall complete a risk assessment in accordance with 40 CFR 745.227(d). Each risk assessment shall be completed in accordance with...

  9. Utility of waist-to-height ratio in assessing the status of central obesity and related cardiometabolic risk profile among normal weight and overweight/obese children: The Bogalusa Heart Study

    Directory of Open Access Journals (Sweden)

    Xu Jihua

    2010-10-01

    Full Text Available Abstract Background Body Mass Index (BMI is widely used to assess the impact of obesity on cardiometabolic risk in children but it does not always relate to central obesity and varies with growth and maturation. Waist-to-Height Ratio (WHtR is a relatively constant anthropometric index of abdominal obesity across different age, sex or racial groups. However, information is scant on the utility of WHtR in assessing the status of abdominal obesity and related cardiometabolic risk profile among normal weight and overweight/obese children, categorized according to the accepted BMI threshold values. Methods Cross-sectional cardiometabolic risk factor variables on 3091 black and white children (56% white, 50% male, 4-18 years of age were used. Based on the age-, race- and sex-specific percentiles of BMI, the children were classified as normal weight (5th - 85th percentiles and overweight/obese (≥ 85th percentile. The risk profiles of each group based on the WHtR ( Results 9.2% of the children in the normal weight group were centrally obese (WHtR ≥0.5 and 19.8% among the overweight/obese were not (WHtR Conclusion WHtR not only detects central obesity and related adverse cardiometabolic risk among normal weight children, but also identifies those without such conditions among the overweight/obese children, which has implications for pediatric primary care practice.

  10. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    International Nuclear Information System (INIS)

    Collins, John W.

    2011-01-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap

  11. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    Energy Technology Data Exchange (ETDEWEB)

    John W. Collins

    2011-09-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap

  12. Exploring the uncertainties in cancer risk assessment using the integrated probabilistic risk assessment (IPRA) approach.

    Science.gov (United States)

    Slob, Wout; Bakker, Martine I; Biesebeek, Jan Dirk Te; Bokkers, Bas G H

    2014-08-01

    Current methods for cancer risk assessment result in single values, without any quantitative information on the uncertainties in these values. Therefore, single risk values could easily be overinterpreted. In this study, we discuss a full probabilistic cancer risk assessment approach in which all the generally recognized uncertainties in both exposure and hazard assessment are quantitatively characterized and probabilistically evaluated, resulting in a confidence interval for the final risk estimate. The methodology is applied to three example chemicals (aflatoxin, N-nitrosodimethylamine, and methyleugenol). These examples illustrate that the uncertainty in a cancer risk estimate may be huge, making single value estimates of cancer risk meaningless. Further, a risk based on linear extrapolation tends to be lower than the upper 95% confidence limit of a probabilistic risk estimate, and in that sense it is not conservative. Our conceptual analysis showed that there are two possible basic approaches for cancer risk assessment, depending on the interpretation of the dose-incidence data measured in animals. However, it remains unclear which of the two interpretations is the more adequate one, adding an additional uncertainty to the already huge confidence intervals for cancer risk estimates. © 2014 Society for Risk Analysis.

  13. The Terrestrial Investigation Model: A probabilistic risk assessment model for birds exposed to pesticides

    Science.gov (United States)

    One of the major recommendations of the National Academy of Science to the USEPA, NMFS and USFWS was to utilize probabilistic methods when assessing the risks of pesticides to federally listed endangered and threatened species. The Terrestrial Investigation Model (TIM, version 3....

  14. Supporting Risk Assessment: Accounting for Indirect Risk to Ecosystem Components

    Science.gov (United States)

    Mach, Megan E.; Martone, Rebecca G.; Singh, Gerald G.; O, Miriam; Chan, Kai M. A.

    2016-01-01

    The multi-scalar complexity of social-ecological systems makes it challenging to quantify impacts from human activities on ecosystems, inspiring risk-based approaches to assessments of potential effects of human activities on valued ecosystem components. Risk assessments do not commonly include the risk from indirect effects as mediated via habitat and prey. In this case study from British Columbia, Canada, we illustrate how such “indirect risks” can be incorporated into risk assessments for seventeen ecosystem components. We ask whether (i) the addition of indirect risk changes the at-risk ranking of the seventeen ecosystem components and if (ii) risk scores correlate with trophic prey and habitat linkages in the food web. Even with conservative assumptions about the transfer of impacts or risks from prey species and habitats, the addition of indirect risks in the cumulative risk score changes the ranking of priorities for management. In particular, resident orca, Steller sea lion, and Pacific herring all increase in relative risk, more closely aligning these species with their “at-risk status” designations. Risk assessments are not a replacement for impact assessments, but—by considering the potential for indirect risks as we demonstrate here—they offer a crucial complementary perspective for the management of ecosystems and the organisms within. PMID:27632287

  15. Avalanche risk assessment in Russia

    Science.gov (United States)

    Komarov, Anton; Seliverstov, Yury; Sokratov, Sergey; Glazovskaya, Tatiana; Turchaniniva, Alla

    2017-04-01

    The avalanche prone area covers about 3 million square kilometers or 18% of total area of Russia and pose a significant problem in most mountain regions of the country. The constant growth of economic activity, especially in the North Caucasus region and therefore the increased avalanche hazard lead to the demand of the large-scale avalanche risk assessment methods development. Such methods are needed for the determination of appropriate avalanche protection measures as well as for economic assessments during all stages of spatial planning of the territory. The requirement of natural hazard risk assessments is determined by the Federal Law of Russian Federation. However, Russian Guidelines (SP 11-103-97; SP 47.13330.2012) are not clearly presented concerning avalanche risk assessment calculations. A great size of Russia territory, vast diversity of natural conditions and large variations in type and level of economic development of different regions cause significant variations in avalanche risk values. At the first stage of research the small scale avalanche risk assessment was performed in order to identify the most common patterns of risk situations and to calculate full social risk and individual risk. The full social avalanche risk for the territory of country was estimated at 91 victims. The area of territory with individual risk values lesser then 1×10(-6) covers more than 92 % of mountain areas of the country. Within these territories the safety of population can be achieved mainly by organizational activities. Approximately 7% of mountain areas have 1×10(-6) - 1×10(-4) individual risk values and require specific mitigation measures to protect people and infrastructure. Territories with individual risk values 1×10(-4) and above covers about 0,1 % of the territory and include the most severe and hazardous mountain areas. The whole specter of mitigation measures is required in order to minimize risk. The future development of such areas is not recommended

  16. Risk assessment in international operations

    International Nuclear Information System (INIS)

    Stricklin, Daniela L.

    2008-01-01

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently

  17. Implications of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Cullingford, M.C.; Shah, S.M.; Gittus, J.H.

    1987-01-01

    Probabilistic risk assessment (PRA) is an analytical process that quantifies the likelihoods, consequences and associated uncertainties of the potential outcomes of postulated events. Starting with planned or normal operation, probabilistic risk assessment covers a wide range of potential accidents and considers the whole plant and the interactions of systems and human actions. Probabilistic risk assessment can be applied in safety decisions in design, licensing and operation of industrial facilities, particularly nuclear power plants. The proceedings include a review of PRA procedures, methods and technical issues in treating uncertainties, operating and licensing issues and future trends. Risk assessment for specific reactor types or components and specific risks (eg aircraft crashing onto a reactor) are used to illustrate the points raised. All 52 articles are indexed separately. (U.K.)

  18. Uncertainties in risk assessment at USDOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

  19. Uncertainties in risk assessment at USDOE facilities

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms open-quote risk assessment close-quote and open-quote risk management close-quote are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of open-quotes... the most significant data and uncertainties...close quotes in an assessment. Significant data and uncertainties are open-quotes...those that define and explain the main risk conclusionsclose quotes. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation

  20. GAR Global Risk Assessment

    Science.gov (United States)

    Maskrey, Andrew; Safaie, Sahar

    2015-04-01

    Disaster risk management strategies, policies and actions need to be based on evidence of current disaster loss and risk patterns, past trends and future projections, and underlying risk factors. Faced with competing demands for resources, at any level it is only possible to priorities a range of disaster risk management strategies and investments with adequate understanding of realised losses, current and future risk levels and impacts on economic growth and social wellbeing as well as cost and impact of the strategy. The mapping and understanding of the global risk landscape has been greatly enhanced by the latest iteration of the GAR Global Risk Assessment and the objective of this submission is to present the GAR global risk assessment which contributed to Global Assessment Report (GAR) 2015. This initiative which has been led by UNISDR, was conducted by a consortium of technical institutions from around the world and has covered earthquake, cyclone, riverine flood, and tsunami probabilistic risk for all countries of the world. In addition, the risks associated with volcanic ash in the Asia-Pacific region, drought in various countries in sub-Saharan Africa and climate change in a number of countries have been calculated. The presentation will share thee results as well as the experience including the challenges faced in technical elements as well as the process and recommendations for the future of such endeavour.

  1. Deterministic quantitative risk assessment development

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, Jane; Colquhoun, Iain [PII Pipeline Solutions Business of GE Oil and Gas, Cramlington Northumberland (United Kingdom)

    2009-07-01

    Current risk assessment practice in pipeline integrity management is to use a semi-quantitative index-based or model based methodology. This approach has been found to be very flexible and provide useful results for identifying high risk areas and for prioritizing physical integrity assessments. However, as pipeline operators progressively adopt an operating strategy of continual risk reduction with a view to minimizing total expenditures within safety, environmental, and reliability constraints, the need for quantitative assessments of risk levels is becoming evident. Whereas reliability based quantitative risk assessments can be and are routinely carried out on a site-specific basis, they require significant amounts of quantitative data for the results to be meaningful. This need for detailed and reliable data tends to make these methods unwieldy for system-wide risk k assessment applications. This paper describes methods for estimating risk quantitatively through the calibration of semi-quantitative estimates to failure rates for peer pipeline systems. The methods involve the analysis of the failure rate distribution, and techniques for mapping the rate to the distribution of likelihoods available from currently available semi-quantitative programs. By applying point value probabilities to the failure rates, deterministic quantitative risk assessment (QRA) provides greater rigor and objectivity than can usually be achieved through the implementation of semi-quantitative risk assessment results. The method permits a fully quantitative approach or a mixture of QRA and semi-QRA to suit the operator's data availability and quality, and analysis needs. For example, consequence analysis can be quantitative or can address qualitative ranges for consequence categories. Likewise, failure likelihoods can be output as classical probabilities or as expected failure frequencies as required. (author)

  2. Evaluation of thermal risk assessment

    International Nuclear Information System (INIS)

    Loos, J.J.; Perry, E.S.

    1993-01-01

    Risk assessment was done in 1983 to estimate the ecological hazard of increasing the generating load and thermal output of an electric generating station. Subsequently, long-term monitoring in the vicinity of the station allowed verification of the predictions made in the risk assessment. This presentation will review the efficacy of early risk assessment methods in producing useful predictions from a resource management point of view. In 1984, the Chalk Point Generating facility of the Potomac Electric Power Company increased it's median generating load by 100%. Prior to this operational change, the Academy of Natural Sciences of Philadelphia synthesized site specific data, model predictions, and results from literature to assess the risk of additional waste heat to the Patuxent River subestuary of Chesapeake Bay. Risk was expressed as the number of days per year that various species of fish and the blue crab would be expected to avoid the discharge vicinity. Accuracy of these predictions is assessed by comparing observed fish and crab distributions and their observed frequencies of avoidance to those predicted. It is concluded that the predictions of this early risk assessment were sufficiently accurate to produce a reliable resource management decision

  3. The utility of childhood and adolescent obesity assessment in relation to adult health

    Science.gov (United States)

    Goldhaber-Fiebert, Jeremy D.; Rubinfeld, Rachel E.; Bhattacharya, Jay; Robinson, Thomas N.; Wise, Paul H.

    2014-01-01

    The high prevalence of childhood obesity has raised concerns regarding long-term patterns of adult health and has generated calls for obesity screening of young children. This study examined patterns of obesity and the predictive utility of obesity screening for children of different ages in terms of adult health outcomes. Using the National Longitudinal Survey of Youth, the Population Study of Income Dynamics, and National Health and Nutrition Evaluation Surveys, we estimated the sensitivity, specificity and predictive value of childhood BMI to identify 2, 5, 10, or 15 year-olds who will become obese adults. We constructed models assessing the relationship of childhood BMI to obesity-related diseases through middle age stratified by sex and race/ethnicity. 12% of 18 year-olds were obese. While 50% of these adolescents would not have been identified by screening at age 5, 9% would have been missed at age 15. Approximately 70% of obese children at age 5 became non-obese at age 18. The predictive utility of obesity screening below the age of 10 was low, even when maternal obesity was also included. The elevated risk of diabetes, obesity, and hypertension in middle age predicted by obesity at age 15 was significantly higher than at age 5 (e.g., the RR of diabetes for obese white male 15 year-olds was 4.5; for 5 year-olds, it was 1.6). Early childhood obesity assessment adds limited predictive utility to strategies that also include later childhood assessment. Targeted approaches in later childhood or universal strategies to prevent unhealthy weight gain should be considered. PMID:22647830

  4. Investigation into the risk perceptions of investors in the securities of nuclear-dependent electric utilities

    International Nuclear Information System (INIS)

    Spudeck, R.E.

    1983-01-01

    Two weeks prior to the Three Mile Island accident, March 15, 1979, the Nuclear Regulatory Commission ordered five operating nuclear plants shut down in order to reexamine safety standards in these plants. Reports in the popular and trade press during this time suggested that these events, particularly the accident at Three Mile Island, caused investors in the securities of electric utilities that had nuclear-generation facilities to revise their risk perceptions. This study was designed to examine the impact of both the Nuclear Regulatory Commission order and the accident at Three Mile Island on investor risk perceptions. Selected categories of electric utilities were chosen to examine any differential risk effects resulting from these events. An asset pricing model devoid of many of the restrictive assumptions of more familiar models was used to model investor behavior. The findings suggest that the events described did cause investors to revise upward their perceptions of systematic risk regarding different categories of electric utilities. More specifically, those electric utilities that were operating nuclear plants in 1979 experienced the largest and most sustained increase in systematic risk. However, electric utilities that in 1979 had no operating nuclear plants, but had planned and committed funds for nuclear plants in the future, also experienced increases in systematic risk

  5. On risk assessment of energy production

    International Nuclear Information System (INIS)

    Kunii, Katsuhiko

    2005-07-01

    Today we cannot ignore the risk of health and/or environment by energy production such as power generation since the risk has been made large enough. In this report an information survey has been done in order to know the outline and points of risk assessment. Based on the information of reports and literature about risk assessment, have been surveyed mainly the external cost assessment of power generation (in which quantification of health and/or environment risk has been done), in addition, risks of disasters, accidents, investments, finance etc. and impacts of those risks on social activities. The remarks obtained by the survey are as follows: 1) Some of external cost assessment of power generation show different results even if the assessment conditions of technology, site, etc. are mostly the same. It is necessary to remark on the information such as basic data, model, background, application limit of assessment considering the reliability. 2) Especially it is considered that the reliability of risk assessment is not enough at present because of the lack of basic data. (author)

  6. Defense Programs Transportation Risk Assessment

    International Nuclear Information System (INIS)

    Clauss, D.B.

    1994-01-01

    This paper provides an overview of the methodology used in a probabilistic transportation risk assessment conducted to assess the probabilities and consequences of inadvertent dispersal of radioactive materials arising from severe transportation accidents. The model was developed for the Defense Program Transportation Risk Assessment (DPTRA) study. The analysis incorporates several enhancements relative to previous risk assessments of hazardous materials transportation including newly-developed statistics on the frequencies and severities of tractor semitrailer accidents and detailed route characterization using the 1990 Census data

  7. Risk Factor Assessment Branch (RFAB)

    Science.gov (United States)

    The Risk Factor Assessment Branch (RFAB) focuses on the development, evaluation, and dissemination of high-quality risk factor metrics, methods, tools, technologies, and resources for use across the cancer research continuum, and the assessment of cancer-related risk factors in the population.

  8. Balancing Cost and Risk: The Treatment of Renewable Energy inWestern Utility Resource Plans

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan; Bolinger, Mark

    2005-09-01

    Markets for renewable electricity have grown significantly in recent years, motivated in part by federal tax incentives and in part by state renewables portfolio standards and renewable energy funds. State renewables portfolio standards, for example, motivated approximately 45% of the 4,300 MW of wind power installed in the U.S. from 2001 through 2004, while renewable energy funds supported an additional 15% of these installations. Despite the importance of these state policies, a less widely recognized driver for renewable energy market growth is poised to also play an important role in the coming years: utility integrated resource planning (IRP). Formal resource planning processes have re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, recent resource plans contemplate a significant amount of renewable energy additions. These planned additions - primarily coming from wind power - are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. The treatment of renewable energy in utility resource plans is not uniform, however. Assumptions about the direct and indirect costs of renewable resources, as well as resource availability, differ, as do approaches to incorporating such resources into the candidate portfolios that are analyzed in utility IRPs. The treatment of natural gas price risk, as well as the risk of future environmental regulations, also varies substantially. How utilities balance expected portfolio cost versus risk in selecting a preferred portfolio also differs. Each of these variables may have a substantial effect on the degree to which renewable energy contributes to the preferred portfolio of each utility IRP. This article

  9. Risk assessments ensure safer power

    Energy Technology Data Exchange (ETDEWEB)

    1982-02-19

    A growth industry is emerging devoted to the study and comparison of the economic, social and health risks posed by large industrial installations. Electricity generation is one area coming under particularly close scrutiny. Types of risk, ways of assessing risk and the difference between experts' analyses and the public perception of risk are given. An example of improved risk assessment helping to reduce deaths and injuries in coal mining is included.

  10. Potential for the adoption of probabilistic risk assessments by end-users and decision-makers

    DEFF Research Database (Denmark)

    Frewer, Lynn J.; Fischer, Arnout R. H.; van den Brink, Paul J.

    2008-01-01

    -user and regulatory uptake has not been, to date, extensive. A case study, utilizing the Theory of Planned Behavior, was conducted in order to identify potential determinants of end-user adoption of probabilistic risk assessments associated with the ecotoxicological impact of pesticides. Seventy potential end...

  11. Risk assessment

    DEFF Research Database (Denmark)

    Pedersen, Liselotte; Rasmussen, Kirsten; Elsass, Peter

    2010-01-01

    International research suggests that using formalized risk assessment methods may improve the predictive validity of professionals' predictions of risk of future violence. This study presents data on forensic psychiatric patients discharged from a forensic unit in Denmark in year 2001-2002 (n=107...... and the individual dynamic items strengthen the use of this scheme in clinical practice. (PsycINFO Database Record (c) 2010 APA, all rights reserved) (journal abstract)...

  12. Sudden Cardiac Arrest (SCA) Risk Assessment

    Science.gov (United States)

    ... HRS Find a Specialist Share Twitter Facebook SCA Risk Assessment Sudden Cardiac Arrest (SCA) occurs abruptly and without ... people of all ages and health conditions. Start Risk Assessment The Sudden Cardiac Arrest (SCA) Risk Assessment Tool ...

  13. Integrated climate change risk assessment:

    DEFF Research Database (Denmark)

    Kaspersen, Per Skougaard; Halsnæs, Kirsten

    2017-01-01

    Risk assessments of flooding in urban areas during extreme precipitation for use in, for example, decision-making regarding climate adaptation, are surrounded by great uncertainties stemming from climate model projections, methods of downscaling and the assumptions of socioeconomic impact models...... to address the complex linkages between the different kinds of data required in assessing climate adaptation. It emphasizes that the availability of spatially explicit data can reduce the overall uncertainty of the risk assessment and assist in identifying key vulnerable assets. The usefulness...... of such a framework is demonstrated by means of a risk assessment of flooding from extreme precipitation for the city of Odense, Denmark. A sensitivity analysis shows how the presence of particularly important assets, such as cultural and historical heritage, may be addressed in assessing such risks. The output...

  14. Haloacetic acids in the aquatic environment. Part II: ecological risk assessment

    International Nuclear Information System (INIS)

    Hanson, Mark L.; Solomon, Keith R.

    2004-01-01

    Haloacetic acids (HAAs) are environmental contaminants found in aquatic ecosystems throughout the world as a result of both anthropogenic and natural production. The ecological risk posed by these compounds to organisms in freshwater environments, with a specific focus on aquatic macrophytes, was characterized. The plants evaluated were Lemna gibba, Myriophyllum spicatum and M. sibiricum and the HAAs screened were monochloroacetic acid (MCA), dichloroacetic acid (DCA), trichloroacetic acid (TCA), trifluoroacetic acid (TFA) and chlorodifluoroacetic acid (CDFA). Laboratory toxicity data formed the basis of the risk assessment, but field studies were also utilized. The estimated risk was calculated using hazard quotients (HQ), as well as effect measure distributions (EMD) in a modified probabilistic ecological risk assessment. EMDs were used to estimate HAA thresholds of toxicity for use in HQ assessments. This threshold was found to be a more sensitive measure of low toxicity than the no observed effect concentrations (NOEC) or the effective concentration (EC 10 ). Using both deterministic and probabilistic methods, it was found that HAAs do not pose a significant risk to freshwater macrophytes at current environmental concentrations in Canada, Europe or Africa for both single compound and mixture exposures. Still, HAAs are generally found as mixtures and their potential interactions are not fully understood, rendering this phase of the assessment uncertain and justifying further effects characterization. TCA in some environments poses a slight risk to phytoplankton and future concentrations of TFA and CDFA are likely to increase due to their recalcitrant nature, warranting continued environmental surveillance of HAAs. - Current environmental concentrations of haloacetic acids do not pose a risk to aquatic macrophytes, but could impact plankton

  15. A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels

    Science.gov (United States)

    Liu, Guo-Feng; Feng, Xia-Ting; Feng, Guang-Liang; Chen, Bing-Rui; Chen, Dong-Fang; Duan, Shu-Qian

    2016-08-01

    Focusing on the problems caused by rockburst hazards in deep tunnels, such as casualties, damage to construction equipment and facilities, construction schedule delays, and project cost increase, this research attempts to present a methodology for dynamic risk assessment and management of rockbursts in D&B tunnels. The basic idea of dynamic risk assessment and management of rockbursts is determined, and methods associated with each step in the rockburst risk assessment and management process are given, respectively. Among them, the main parts include a microseismic method for early warning the occurrence probability of rockburst risk, an estimation method that aims to assess potential consequences of rockburst risk, an evaluation method that utilizes a new quantitative index considering both occurrence probability and consequences for determining the level of rockburst risk, and the dynamic updating. Specifically, this research briefly describes the referenced microseismic method of warning rockburst, but focuses on the analysis of consequences and associated risk assessment and management of rockburst. Using the proposed method of risk assessment and management of rockburst, the occurrence probability, potential consequences, and the level of rockburst risk can be obtained in real-time during tunnel excavation, which contributes to the dynamic optimisation of risk mitigation measures and their application. The applicability of the proposed method has been verified by those cases from the Jinping II deep headrace and water drainage tunnels at depths of 1900-2525 m (with a length of 11.6 km in total for D&B tunnels).

  16. Utility of the exercise electrocardiogram testing in sudden cardiac death risk stratification.

    Science.gov (United States)

    Refaat, Marwan M; Hotait, Mostafa; Tseng, Zian H

    2014-07-01

    Sudden cardiac death (SCD) remains a major public health problem. Current established criteria identifying those at risk of sudden arrhythmic death, and likely to benefit from implantable cardioverter defibrillators (ICDs), are neither sensitive nor specific. Exercise electrocardiogram (ECG) testing was traditionally used for information concerning patients' symptoms, exercise capacity, cardiovascular function, myocardial ischemia detection, and hemodynamic responses during activity in patients with hypertrophic cardiomyopathy. We conducted a systematic review of MEDLINE on the utility of exercise ECG testing in SCD risk stratification. Exercise testing can unmask suspected primary electrical diseases in certain patients (catecholaminergic polymorphic ventricular tachycardia or concealed long QT syndrome) and can be effectively utilized to risk stratify patients at an increased (such as early repolarization syndrome and Brugada syndrome) or decreased risk of SCD, such as the loss of preexcitation on exercise testing in asymptomatic Wolff-Parkinson-White syndrome. Exercise ECG testing helps in SCD risk stratification in patients with and without arrhythmogenic hereditary syndromes. © 2014 Wiley Periodicals, Inc.

  17. A genetic fuzzy system for unstable angina risk assessment.

    Science.gov (United States)

    Dong, Wei; Huang, Zhengxing; Ji, Lei; Duan, Huilong

    2014-02-18

    Unstable Angina (UA) is widely accepted as a critical phase of coronary heart disease with patients exhibiting widely varying risks. Early risk assessment of UA is at the center of the management program, which allows physicians to categorize patients according to the clinical characteristics and stratification of risk and different prognosis. Although many prognostic models have been widely used for UA risk assessment in clinical practice, a number of studies have highlighted possible shortcomings. One serious drawback is that existing models lack the ability to deal with the intrinsic uncertainty about the variables utilized. In order to help physicians refine knowledge for the stratification of UA risk with respect to vagueness in information, this paper develops an intelligent system combining genetic algorithm and fuzzy association rule mining. In detail, it models the input information's vagueness through fuzzy sets, and then applies a genetic fuzzy system on the acquired fuzzy sets to extract the fuzzy rule set for the problem of UA risk assessment. The proposed system is evaluated using a real data-set collected from the cardiology department of a Chinese hospital, which consists of 54 patient cases. 9 numerical patient features and 17 categorical patient features that appear in the data-set are selected in the experiments. The proposed system made the same decisions as the physician in 46 (out of a total of 54) tested cases (85.2%). By comparing the results that are obtained through the proposed system with those resulting from the physician's decision, it has been found that the developed model is highly reflective of reality. The proposed system could be used for educational purposes, and with further improvements, could assist and guide young physicians in their daily work.

  18. Assessing Your Weight and Health Risk

    Science.gov (United States)

    ... Health Professional Resources Assessing Your Weight and Health Risk Assessment of weight and health risk involves using ... risk for developing obesity-associated diseases or conditions. Risk Factors for Health Topics Associated With Obesity Along ...

  19. Determinants of Mental Health Care Utilization in a Suicide High-risk Group With Suicidal Ideation

    Directory of Open Access Journals (Sweden)

    Hyun-Soo Kim

    2016-01-01

    Full Text Available Objectives: The suicide rate in Korea is increasing every year, and is the highest among the Organization for Economic Cooperation and Development countries. Psychiatric patients in particular have a higher risk of suicide than other patients. This study was performed to evaluate determinants of mental health care utilization among individuals at high risk for suicide. Methods: Korea Health Panel data from 2009 to 2011 were used. Subjects were individuals at high risk of suicide who had suicidal ideation, a past history of psychiatric illness, or had utilized outpatient services for a psychiatric disorder associated with suicidal ideation within the past year. The chi-square test and hierarchical logistic regression were used to identify significant determinants of mental health care utilization. Results: The total number of subjects with complete data on the variables in our model was 989. Individuals suffering from three or more chronic diseases used mental health care more frequently. Mental health care utilization was higher in subjects who had middle or high levels of educational attainment, were receiving Medical Aid, or had a large family size. Conclusions: It is important to control risk factors in high-risk groups as part of suicide prevention strategies. The clinical approach, which includes community-based intervention, entails the management of reduction of suicidal risk. Our study identified demographic characteristics that have a significant impact on mental health care utilization and should be considered in the development of suicide prevention strategies. Further studies should examine the effect of mental health care utilization on reducing suicidal ideation.

  20. Determinants of Mental Health Care Utilization in a Suicide High-risk Group With Suicidal Ideation.

    Science.gov (United States)

    Kim, Hyun-Soo; Lee, Moo-Sik; Hong, Jee-Young

    2016-01-01

    The suicide rate in Korea is increasing every year, and is the highest among the Organization for Economic Cooperation and Development countries. Psychiatric patients in particular have a higher risk of suicide than other patients. This study was performed to evaluate determinants of mental health care utilization among individuals at high risk for suicide. Korea Health Panel data from 2009 to 2011 were used. Subjects were individuals at high risk of suicide who had suicidal ideation, a past history of psychiatric illness, or had utilized outpatient services for a psychiatric disorder associated with suicidal ideation within the past year. The chi-square test and hierarchical logistic regression were used to identify significant determinants of mental health care utilization. The total number of subjects with complete data on the variables in our model was 989. Individuals suffering from three or more chronic diseases used mental health care more frequently. Mental health care utilization was higher in subjects who had middle or high levels of educational attainment, were receiving Medical Aid, or had a large family size. It is important to control risk factors in high-risk groups as part of suicide prevention strategies. The clinical approach, which includes community-based intervention, entails the management of reduction of suicidal risk. Our study identified demographic characteristics that have a significant impact on mental health care utilization and should be considered in the development of suicide prevention strategies. Further studies should examine the effect of mental health care utilization on reducing suicidal ideation.

  1. Risk assessment theory, methods, and applications

    CERN Document Server

    Rausand, Marvin

    2011-01-01

    With its balanced coverage of theory and applications along with standards and regulations, Risk Assessment: Theory, Methods, and Applications serves as a comprehensive introduction to the topic. The book serves as a practical guide to current risk analysis and risk assessment, emphasizing the possibility of sudden, major accidents across various areas of practice from machinery and manufacturing processes to nuclear power plants and transportation systems. The author applies a uniform framework to the discussion of each method, setting forth clear objectives and descriptions, while also shedding light on applications, essential resources, and advantages and disadvantages. Following an introduction that provides an overview of risk assessment, the book is organized into two sections that outline key theory, methods, and applications. * Introduction to Risk Assessment defines key concepts and details the steps of a thorough risk assessment along with the necessary quantitative risk measures. Chapters outline...

  2. Individual Differences in Subjective Utility and Risk Preferences: The Influence of Hedonic Capacity and Trait Anxiety

    Science.gov (United States)

    Howlett, Jonathon R.; Paulus, Martin P.

    2017-01-01

    Individual differences in decision-making are important in both normal populations and psychiatric conditions. Variability in decision-making could be mediated by different subjective utilities or by other processes. For example, while traditional economic accounts attribute risk aversion to a concave subjective utility curve, in practice other factors could affect risk behavior. This distinction may have important implications for understanding the biological basis of variability in decision-making and for developing interventions to improve decision-making. Another aspect of decision-making that may vary between individuals is the sensitivity of subjective utility to counterfactual outcomes (outcomes that could have occurred, but did not). We investigated decision-making in relation to hedonic capacity and trait anxiety, two traits that relate to psychiatric conditions but also vary in the general population. Subjects performed a decision-making task, in which they chose between low- and high-risk gambles to win 0, 20, or 40 points on each trial. Subjects then rated satisfaction after each outcome on a visual analog scale, indicating subjective utility. Hedonic capacity was positively associated with the subjective utility of winning 20 points but was not associated with the concavity of the subjective utility curve (constructed using the mean subjective utility of winning 0, 20, or 40 points). Consistent with economic theory, concavity of the subjective utility curve was associated with risk aversion. Hedonic capacity was independently associated with risk seeking (i.e., not mediated by the shape of the subjective utility curve), while trait anxiety was unrelated to risk preferences. Contrary to our expectations, counterfactual sensitivity was unrelated to hedonic capacity and trait anxiety. Nevertheless, trait anxiety was associated with a self-report measure of regret-proneness, suggesting that counterfactual influences may occur via a pathway that is separate

  3. Individual Differences in Subjective Utility and Risk Preferences: The Influence of Hedonic Capacity and Trait Anxiety.

    Science.gov (United States)

    Howlett, Jonathon R; Paulus, Martin P

    2017-01-01

    Individual differences in decision-making are important in both normal populations and psychiatric conditions. Variability in decision-making could be mediated by different subjective utilities or by other processes. For example, while traditional economic accounts attribute risk aversion to a concave subjective utility curve, in practice other factors could affect risk behavior. This distinction may have important implications for understanding the biological basis of variability in decision-making and for developing interventions to improve decision-making. Another aspect of decision-making that may vary between individuals is the sensitivity of subjective utility to counterfactual outcomes (outcomes that could have occurred, but did not). We investigated decision-making in relation to hedonic capacity and trait anxiety, two traits that relate to psychiatric conditions but also vary in the general population. Subjects performed a decision-making task, in which they chose between low- and high-risk gambles to win 0, 20, or 40 points on each trial. Subjects then rated satisfaction after each outcome on a visual analog scale, indicating subjective utility. Hedonic capacity was positively associated with the subjective utility of winning 20 points but was not associated with the concavity of the subjective utility curve (constructed using the mean subjective utility of winning 0, 20, or 40 points). Consistent with economic theory, concavity of the subjective utility curve was associated with risk aversion. Hedonic capacity was independently associated with risk seeking (i.e., not mediated by the shape of the subjective utility curve), while trait anxiety was unrelated to risk preferences. Contrary to our expectations, counterfactual sensitivity was unrelated to hedonic capacity and trait anxiety. Nevertheless, trait anxiety was associated with a self-report measure of regret-proneness, suggesting that counterfactual influences may occur via a pathway that is separate

  4. Individual Differences in Subjective Utility and Risk Preferences: The Influence of Hedonic Capacity and Trait Anxiety

    Directory of Open Access Journals (Sweden)

    Jonathon R. Howlett

    2017-05-01

    Full Text Available Individual differences in decision-making are important in both normal populations and psychiatric conditions. Variability in decision-making could be mediated by different subjective utilities or by other processes. For example, while traditional economic accounts attribute risk aversion to a concave subjective utility curve, in practice other factors could affect risk behavior. This distinction may have important implications for understanding the biological basis of variability in decision-making and for developing interventions to improve decision-making. Another aspect of decision-making that may vary between individuals is the sensitivity of subjective utility to counterfactual outcomes (outcomes that could have occurred, but did not. We investigated decision-making in relation to hedonic capacity and trait anxiety, two traits that relate to psychiatric conditions but also vary in the general population. Subjects performed a decision-making task, in which they chose between low- and high-risk gambles to win 0, 20, or 40 points on each trial. Subjects then rated satisfaction after each outcome on a visual analog scale, indicating subjective utility. Hedonic capacity was positively associated with the subjective utility of winning 20 points but was not associated with the concavity of the subjective utility curve (constructed using the mean subjective utility of winning 0, 20, or 40 points. Consistent with economic theory, concavity of the subjective utility curve was associated with risk aversion. Hedonic capacity was independently associated with risk seeking (i.e., not mediated by the shape of the subjective utility curve, while trait anxiety was unrelated to risk preferences. Contrary to our expectations, counterfactual sensitivity was unrelated to hedonic capacity and trait anxiety. Nevertheless, trait anxiety was associated with a self-report measure of regret-proneness, suggesting that counterfactual influences may occur via a pathway

  5. The issue of risk dilution in risk assessments

    International Nuclear Information System (INIS)

    Wilmot, R.; Robinson, P.

    2004-01-01

    This paper explores an issue that was first highlighted more than 20 years ago during an inquiry concerning the Sizeweli B nuclear power station in the UK. In the probabilistic safety assessment for this plant, the proponent had apparently reduced its estimates of risk by admitting to increased uncertainty about the timing of certain events. This situation is counter-intuitive, since an increase in uncertainty about the factors contributing to safety would be expected to lead to less confidence and hence to greater risk. This paradoxical situation was termed 'risk dilution' and it has been a topic of interest to reviewers of safety cases since. The recent international peer review of the Yucca Mountain performance assessments concluded that there was a potential for risk dilution in the assumptions and calculations presented. The next section describes how assumptions about the timing of events and other aspects of an assessment may lead to risk dilution, and this is followed by two examples based on recent performance assessments. The final section discusses how potential problems can be identified in safety cases, and the types of response that a regulator might adopt as a result. (authors)

  6. Build Resilience at Your Utility

    Science.gov (United States)

    CREAT allows users to evaluate potential impacts of climate change on their utility and to evaluate adaptation options to address them using both traditional risk assessment and scenario-based decision making.

  7. Effects of Geographic Diversification on Risk Pooling to Mitigate Drought-Related Financial Losses for Water Utilities

    Science.gov (United States)

    Baum, Rachel; Characklis, Gregory W.; Serre, Marc L.

    2018-04-01

    As the costs and regulatory barriers to new water supply development continue to rise, drought management strategies have begun to rely more heavily on temporary conservation measures. While these measures are effective, they often lead to intermittent and unpredictable reductions in revenues that are financially disruptive to water utilities, raising concerns over lower credit ratings and higher rates of borrowing for this capital intensive sector. Consequently, there is growing interest in financial risk management strategies that reduce utility vulnerabilities. This research explores the development of financial index insurance designed to compensate a utility for drought-related losses. The focus is on analyzing candidate hydrologic indices that have the potential to be used by utilities across the US, increasing the potential for risk pooling, which would offer the possibility of both lower risk management costs and more widespread implementation. This work first analyzes drought-related financial risks for 315 publicly operated water utilities across the country and examines the effectiveness of financial contracts based on several indices both in terms of their correlation with utility revenues and their spatial autocorrelation across locations. Hydrologic-based index insurance contracts are then developed and tested over a 120 year period. Results indicate that risk pooling, even under conditions in which droughts are subject to some level of spatial autocorrelation, has the potential to significantly reduce the cost of managing financial risk.

  8. Risk Assessment in the Maritime Industry

    Directory of Open Access Journals (Sweden)

    M. Mousavi

    2017-02-01

    Full Text Available Risk assessment is a well-developed field which many operators are currently applying to improve their operations and reduce their risk exposure. This paper is intended to provide an overview of the risk assessment for mariners in the Maritime transportation. The risks addressed are primarily those affecting the safety of a vessel, facility or operation. The concept of risk is defined, and the methods available to assess the risks associated with an operation are described. Regulatory requirements that have prompted the development of modern risk assessment practices are described, and future regulatory trends are discussed. There are many different analysis techniques and models that have been developed to aid in conducting risk assessments. A key to any successful risk analysis is choosing the right method (or combination of methods for the situation at hand. This is achieved through critical analysis of the available data concerning marine crises. This paper provides a brief introduction to some of the analysis methods available and suggests risk analysis approaches to support different types of decision making within the maritime transportation to cope with crises. Finally, as awareness of risk assessment increases, the benefits which can be realized through its application will continue to increase. Organizations in both the public and the private sector are becoming more and more familiar with the benefits associated with risk-based approaches to managing safety and consequently reducing crisis in maritime transportation.

  9. The MARINA Risk Assessment Strategy: A Flexible Strategy for Efficient Information Collection and Risk Assessment of Nanomaterials.

    Science.gov (United States)

    Bos, Peter M J; Gottardo, Stefania; Scott-Fordsmand, Janeck J; van Tongeren, Martie; Semenzin, Elena; Fernandes, Teresa F; Hristozov, Danail; Hund-Rinke, Kerstin; Hunt, Neil; Irfan, Muhammad-Adeel; Landsiedel, Robert; Peijnenburg, Willie J G M; Sánchez Jiménez, Araceli; van Kesteren, Petra C E; Oomen, Agnes G

    2015-11-27

    An engineered nanomaterial (ENM) may actually consist of a population of primary particles, aggregates and agglomerates of various sizes. Furthermore, their physico-chemical characteristics may change during the various life-cycle stages. It will probably not be feasible to test all varieties of all ENMs for possible health and environmental risks. There is therefore a need to further develop the approaches for risk assessment of ENMs. Within the EU FP7 project Managing Risks of Nanoparticles (MARINA) a two-phase risk assessment strategy has been developed. In Phase 1 (Problem framing) a base set of information is considered, relevant exposure scenarios (RESs) are identified and the scope for Phase 2 (Risk assessment) is established. The relevance of an RES is indicated by information on exposure, fate/kinetics and/or hazard; these three domains are included as separate pillars that contain specific tools. Phase 2 consists of an iterative process of risk characterization, identification of data needs and integrated collection and evaluation of data on the three domains, until sufficient information is obtained to conclude on possible risks in a RES. Only data are generated that are considered to be needed for the purpose of risk assessment. A fourth pillar, risk characterization, is defined and it contains risk assessment tools. This strategy describes a flexible and efficient approach for data collection and risk assessment which is essential to ensure safety of ENMs. Further developments are needed to provide guidance and make the MARINA Risk Assessment Strategy operational. Case studies will be needed to refine the strategy.

  10. The MARINA Risk Assessment Strategy: A Flexible Strategy for Efficient Information Collection and Risk Assessment of Nanomaterials

    Directory of Open Access Journals (Sweden)

    Peter M. J. Bos

    2015-11-01

    Full Text Available An engineered nanomaterial (ENM may actually consist of a population of primary particles, aggregates and agglomerates of various sizes. Furthermore, their physico-chemical characteristics may change during the various life-cycle stages. It will probably not be feasible to test all varieties of all ENMs for possible health and environmental risks. There is therefore a need to further develop the approaches for risk assessment of ENMs. Within the EU FP7 project Managing Risks of Nanoparticles (MARINA a two-phase risk assessment strategy has been developed. In Phase 1 (Problem framing a base set of information is considered, relevant exposure scenarios (RESs are identified and the scope for Phase 2 (Risk assessment is established. The relevance of an RES is indicated by information on exposure, fate/kinetics and/or hazard; these three domains are included as separate pillars that contain specific tools. Phase 2 consists of an iterative process of risk characterization, identification of data needs and integrated collection and evaluation of data on the three domains, until sufficient information is obtained to conclude on possible risks in a RES. Only data are generated that are considered to be needed for the purpose of risk assessment. A fourth pillar, risk characterization, is defined and it contains risk assessment tools. This strategy describes a flexible and efficient approach for data collection and risk assessment which is essential to ensure safety of ENMs. Further developments are needed to provide guidance and make the MARINA Risk Assessment Strategy operational. Case studies will be needed to refine the strategy.

  11. Assessing Pinyon Juniper Feedstock Properties and Utilization Options

    Energy Technology Data Exchange (ETDEWEB)

    Gresham, Garold Linn [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kenney, Kevin Louis [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-08-01

    Pinyon-juniper woodlands are a major ecosystem type found in the Southwest and the Intermountain West regions of the United States. These ecosystems are characterized by the presence of several different species of pinyon pine and juniper as the dominant plant cover. Since the 1800s, pinyon-juniper woodlands have rapidly expanded their range at the expense of existing ecosystems. Additionally, existing woodlands have become more dense, potentially increasing fire hazards. Land managers responsible for these areas often desire to reduce pinyonjuniper coverage on their lands for a variety of reasons, including restoration to previous vegetative cover, mitigation of fire risk, and improvement in wildlife habitat. However, the cost of clearing or thinning pinyon-juniper stands can be prohibitive. One reason for this is the lack of utilization options for the resulting biomass that could help recover some of the cost of pinyonjuniper stand management. The goal of this project was to assess the feedstock characteristics of biomass from a pinyon-juniper harvest so that potential applications for the biomass may be evaluated.

  12. BYSTANDER EFFECTS, GENOMIC INSTABILITY, ADAPTIVE RESPONSE AND CANCER RISK ASSESSMENT FOR RADIATION AND CHEMICAL EXPOSURES

    Science.gov (United States)

    There is an increased interest in utilizing mechanistic data in support of the cancer risk assessment process for ionizing radiation and environmental chemical exposures. In this regard the use of biologically based dose-response models is particularly advocated. The aim is to pr...

  13. Business risks, functions, methods of assessment and ways to reduce risk

    Directory of Open Access Journals (Sweden)

    A.V. Mihalchuk

    2015-06-01

    Full Text Available For successful existence in a market economy entrepreneur have to take bold actions, and this increases the risk. The article describes the concept of entrepreneurship and business risk, positive and negative aspects of functions of risk in business. Therefore, it is necessary to assess the risk properly and be able to manage it to achieve the most effective results in the market. In market conditions the problem of assessing and accounting market becomes independent theoretical and practical significance as an important component of the theory and practice of management. Risk - a key element of business activities. Development of risk situations can lead to both the occurrence of adverse effects (losses, lost profits, and positive results for a company in the form of increased profit. This article describes: the concept of entrepreneurship, risk and business risks, characteristic of positive and negative aspects of risk functions in business, methods of assessment and risk reduction, shows formulae and examples you can use to assess risk in an enterprise. Analyzing already established methods of risk assessment a number of rules were proposed in order to reduce business risk.

  14. Risk Assessment

    OpenAIRE

    Hrdová, Edita

    2012-01-01

    This diploma thesis is focused on companies risk evaluation before endorsement of Loan deriving from business relationships. The aim of this thesis is not only to describe individual steps of risk assessment, but also perfom analysis of particular companies based on available data, i.e. Balance sheet, Profit and Loss statement and external rating and after that propose solution for each company. My analysis will be based on theoretical knowledge, further on experience related to my job role a...

  15. Improving risk assessment of violence among military veterans: an evidence-based approach for clinical decision-making.

    Science.gov (United States)

    Elbogen, Eric B; Fuller, Sara; Johnson, Sally C; Brooks, Stephanie; Kinneer, Patricia; Calhoun, Patrick S; Beckham, Jean C

    2010-08-01

    Increased media attention to post-deployment violence highlights the need to develop effective models to guide risk assessment among military Veterans. Ideally, a method would help identify which Veterans are most at risk for violence so that it can be determined what could be done to prevent violent behavior. This article suggests how empirical approaches to risk assessment used successfully in civilian populations can be applied to Veterans. A review was conducted of the scientific literature on Veteran populations regarding factors related to interpersonal violence generally and to domestic violence specifically. A checklist was then generated of empirically-supported risk factors for clinicians to consider in practice. To conceptualize how these known risk factors relate to a Veteran's violence potential, risk assessment scholarship was utilized to develop an evidence-based method to guide mental health professionals. The goals of this approach are to integrate science into practice, overcome logistical barriers, and permit more effective assessment, monitoring, and management of violence risk for clinicians working with Veterans, both in Department of Veteran Affairs settings and in the broader community. Research is needed to test the predictive validity of risk assessment models. Ultimately, the use of a systematic, empirical framework could lead to improved clinical decision-making in the area of risk assessment and potentially help prevent violence among Veterans. Published by Elsevier Ltd.

  16. HTGR accident and risk assessment

    International Nuclear Information System (INIS)

    Silady, F.A.; Everline, C.J.; Houghton, W.J.

    1982-01-01

    This paper is a synopsis of the high-temperature gas-cooled reactor probabilistic risk assessments (PRAs) performed by General Atomic Company. Principal topics presented include: HTGR safety assessments, peer interfaces, safety research, process gas explosions, quantitative safety goals, licensing applications of PRA, enhanced safety, investment risk assessments, and PRA design integration

  17. Anthropic Risk Assessment on Biodiversity

    Science.gov (United States)

    Piragnolo, M.; Pirotti, F.; Vettore, A.; Salogni, G.

    2013-01-01

    This paper presents a methodology for risk assessment of anthropic activities on habitats and species. The method has been developed for Veneto Region, in order to simplify and improve the quality of EIA procedure (VINCA). Habitats and species, animals and plants, are protected by European Directive 92/43/EEC and 2009/147/EC but they are subject at hazard due to pollution produced by human activities. Biodiversity risks may conduct to deterioration and disturbance in ecological niches, with consequence of loss of biodiversity. Ecological risk assessment applied on Natura 2000 network, is needed to best practice of management and monitoring of environment and natural resources. Threats, pressure and activities, stress and indicators may be managed by geodatabase and analysed using GIS technology. The method used is the classic risk assessment in ecological context, and it defines the natural hazard as influence, element of risk as interference and vulnerability. Also it defines a new parameter called pressure. It uses risk matrix for the risk analysis on spatial and temporal scale. The methodology is qualitative and applies the precautionary principle in environmental assessment. The final product is a matrix which excludes the risk and could find application in the development of a territorial information system.

  18. Risk assessment and the environment

    International Nuclear Information System (INIS)

    Fisk, D.J.

    1992-01-01

    This paper reviews the use of risk assessment techniques in the field of environment protection. I will argue that in some important instances the development of environment policy has been a source of fruitful development of a risk based methodologies. In other cases the importation of risk assessment techniques has proved much more problematic. As the scope of environmental regulation increases so does the possibility of inconsistent and arbitrary solutions to problems. The need for a more systematic approach to the development of environmental regulation has never been stronger, so it is important to understand the reasons for the mixed success of risk assessment. This applies equally to those nations with long traditions of the regulation of private sector industry and those just beginning on this course. The way ahead may be to extend our ideas of how to express risk and uncertainty. Some of the recent cause celebres of environment policy show this challenge very clearly. As an example, this paper will look at the problem of assessing the risk of man-made climate change

  19. Risk assessment and the environment

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, D J [Department of the Environment (United Kingdom)

    1992-07-01

    This paper reviews the use of risk assessment techniques in the field of environment protection. I will argue that in some important instances the development of environment policy has been a source of fruitful development of a risk based methodologies. In other cases the importation of risk assessment techniques has proved much more problematic. As the scope of environmental regulation increases so does the possibility of inconsistent and arbitrary solutions to problems. The need for a more systematic approach to the development of environmental regulation has never been stronger, so it is important to understand the reasons for the mixed success of risk assessment. This applies equally to those nations with long traditions of the regulation of private sector industry and those just beginning on this course. The way ahead may be to extend our ideas of how to express risk and uncertainty. Some of the recent cause celebres of environment policy show this challenge very clearly. As an example, this paper will look at the problem of assessing the risk of man-made climate change.

  20. Scenario-neutral Food Security Risk Assessment: A livestock Heat Stress Case Study

    Science.gov (United States)

    Broman, D.; Rajagopalan, B.; Hopson, T. M.

    2015-12-01

    Food security risk assessments can provide decision-makers with actionable information to identify critical system limitations, and alternatives to mitigate the impacts of future conditions. The majority of current risk assessments have been scenario-led and results are limited by the scenarios - selected future states of the world's climate system and socioeconomic factors. A generic scenario-neutral framework for food security risk assessments is presented here that uses plausible states of the world without initially assigning likelihoods. Measures of system vulnerabilities are identified and system risk is assessed for these states. This framework has benefited greatly by research in the water and natural resource fields to adapt their planning to provide better risk assessments. To illustrate the utility of this framework we develop a case study using livestock heat stress risk within the pastoral system of West Africa. Heat stress can have a major impact not only on livestock owners, but on the greater food production system, decreasing livestock growth, milk production, and reproduction, and in severe cases, death. A heat stress index calculated from daily weather is used as a vulnerability measure and is computed from historic daily weather data at several locations in the study region. To generate plausible states, a stochastic weather generator is developed to generate synthetic weather sequences at each location, consistent with the seasonal climate. A spatial model of monthly and seasonal heat stress provide projections of current and future livestock heat stress measures across the study region, and can incorporate in seasonal climate and other external covariates. These models, when linked with empirical thresholds of heat stress risk for specific breeds offer decision-makers with actionable information for use in near-term warning systems as well as for future planning. Future assessment can indicate under which states livestock are at greatest risk

  1. Nuclear insurance risk assessment using risk-based methodology

    International Nuclear Information System (INIS)

    Wendland, W.G.

    1992-01-01

    This paper presents American Nuclear Insurers' (ANI's) and Mutual Atomic Energy Liability Underwriters' (MAELU's) process and experience for conducting nuclear insurance risk assessments using a risk-based methodology. The process is primarily qualitative and uses traditional insurance risk assessment methods and an approach developed under the auspices of the American Society of Mechanical Engineers (ASME) in which ANI/MAELU is an active sponsor. This process assists ANI's technical resources in identifying where to look for insurance risk in an industry in which insurance exposure tends to be dynamic and nonactuarial. The process is an evolving one that also seeks to minimize the impact on insureds while maintaining a mutually agreeable risk tolerance

  2. Lessons learned from first generation nuclear plant probabalistic risk assessments

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1984-01-01

    The paper by Garrick summarizes the state-of-the-art in what are perhaps the most archetypical probabilistic risk assessments (PRAs). Because of its unique regulatory environment and because of the high levels of perceived (not necessarily actual) risk, the nuclear industry more than any other has been concerned with quantitative risk analysis. Garrick's paper summarizes the lessons learned from ten PRA's conducted in the nuclear industry, including six that can be characterized as full-scope risk studies. Most of the quantitative data, though, came from two especially thorough studies done for the Zion and Indian Point power plants, operated by Commonwealth Edison and Consolidated Edison respectively. The principal conclusions of the Garrick survey are that the public risk (from radiation release) is now known to be very small for commercial nuclear power plants, but that the risk to utilities (from core damage) is somewhat larger. Significant radiation releases require both core meltdown -- an event occurring only about once every 10,000 reactor-years -- and containment failure, occurring only about once in every hundred meltdowns

  3. Developing the Regulatory Utility of the Exposome: Mapping Exposures for Risk Assessment through Lifestage Exposome Snapshots (LEnS).

    Science.gov (United States)

    Shaffer, Rachel M; Smith, Marissa N; Faustman, Elaine M

    2017-08-07

    Exposome-related efforts aim to document the totality of human exposures across the lifecourse. This field has advanced rapidly in recent years but lacks practical application to risk assessment, particularly for children's health. Our objective was to apply the exposome to children's health risk assessment by introducing the concept of Lifestage Exposome Snapshots (LEnS). Case studies are presented to illustrate the value of the framework. The LEnS framework encourages organization of exposome studies based on windows of susceptibility for particular target organ systems. Such analyses will provide information regarding cumulative impacts during specific critical periods of the life course. A logical extension of this framework is that regulatory standards should analyze exposure information by target organ, rather than for a single chemical only or multiple chemicals grouped solely by mechanism of action. The LEnS concept is a practical refinement to the exposome that accounts for total exposures during particular windows of susceptibility in target organ systems. Application of the LEnS framework in risk assessment and regulation will improve protection of children's health by enhancing protection of sensitive developing organ systems that are critical for lifelong health and well-being. https://doi.org/10.1289/EHP1250.

  4. Risk assessment for halogenated solvents

    International Nuclear Information System (INIS)

    Travis, C.C.

    1988-01-01

    A recent development in the cancer risk area is the advent of biologically based pharmacokinetic and pharmacodynamic models. These models allow for the incorporation of biological and mechanistic data into the risk assessment process. These advances will not only improve the risk assessment process for halogenated solvents but will stimulate and guide basic research in the biological area

  5. RESIDUAL RISK ASSESSMENT: ETHYLENE OXIDE ...

    Science.gov (United States)

    This document describes the residual risk assessment for the Ethylene Oxide Commercial Sterilization source category. For stationary sources, section 112 (f) of the Clean Air Act requires EPA to assess risks to human health and the environment following implementation of technology-based control standards. If these technology-based control standards do not provide an ample margin of safety, then EPA is required to promulgate addtional standards. This document describes the methodology and results of the residual risk assessment performed for the Ethylene Oxide Commercial Sterilization source category. The results of this analyiss will assist EPA in determining whether a residual risk rule for this source category is appropriate.

  6. Risk assessment of river-type hydropower plants using fuzzy logic approach

    Energy Technology Data Exchange (ETDEWEB)

    Kucukali, Serhat, E-mail: kucukali@cankaya.edu.tr [Civil Engineering Department, Cankaya University, Balgat 06530, Ankara (Turkey)

    2011-10-15

    In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk assessment and expert judgments were utilized instead of probabilistic reasoning. The methodology is a multi-criteria decision analysis, which provides a flexible and easily understood way to analyze project risks. The external risks, which are partly under the control of companies, were considered in the model. A total of eleven classes of risk factors were determined based on the expert interviews, field studies and literature review as follows: site geology, land use, environmental issues, grid connection, social acceptance, macroeconomic, natural hazards, change of laws and regulations, terrorism, access to infrastructure and revenue. The relative importance of risk factors was determined from the survey results. The survey was conducted with the experts that have experience in the construction of river-type hydropower schemes. The survey results revealed that the site geology and environmental issues were considered as the most important risks. The new risk assessment method enabled a Risk Index (R) value to be calculated, establishing a 4-grade evaluation system. The proposed risk analysis will give investors a more rational basis to make decisions and it can prevent cost and schedule overruns. - Highlights: > A new methodology is proposed for risk rating of river-type hydropower plant projects. > The relative importance of the risk factors was determined from the expert judgments. > The most concerned risks have been found as environmental issues and site geology. > The proposed methodology was tested on a real case. > The proposed risk analysis will give investors a more rational basis.

  7. Risk assessment: An employer's perspective

    International Nuclear Information System (INIS)

    Williams, K.C.

    1992-01-01

    There is no question that a careful assessment of risk is essential for safe industrial operations. For that reason, a thoughtful analysis of the effectiveness of available risk assessment technologies is prerequisite for responsible corporate decision making. An 'employer's' perspective on risk assessment cannot be constrained by any artificial restrictions which that term may imply. In reality, all those who are involved in the execution of an industrial enterprise: managers, regulators, the affected public, and especially those employees exposed to hazards, are necessarily partners in assessment of risk. The perspective of this paper is that of the oil and gas industry, in which the author's organization, Exxon Company, International, participates. The paper addresses what Exxon requires to assess and manage risk in its worldwide operations. The author is aware, however, through contacts with industry colleagues, that some of Exxon's initiatives are representative of similar actions being taken by others. 1992 is the European Year of Safety, Health and Hygiene, coinciding with the United Kingdom's Presidency of the European Council. It is also the year in which new 'goal-setting' regulations covering safety in the U.K. offshore oil industry were put forward by the Health and Safety Commission. These regulations, based largely on Lord Cullen's recommendations following the Piper Alpha tragedy, set the pace for safety in the British North Sea and will significantly impact the safety of offshore oil installations worldwide. The requirement for risk assessment, using a systematic process of analysing and evaluating risk, is a key component of this safety regime

  8. Risk assessment: An employer's perspective

    Energy Technology Data Exchange (ETDEWEB)

    Williams, K C [Exxon International (United States)

    1992-07-01

    There is no question that a careful assessment of risk is essential for safe industrial operations. For that reason, a thoughtful analysis of the effectiveness of available risk assessment technologies is prerequisite for responsible corporate decision making. An 'employer's' perspective on risk assessment cannot be constrained by any artificial restrictions which that term may imply. In reality, all those who are involved in the execution of an industrial enterprise: managers, regulators, the affected public, and especially those employees exposed to hazards, are necessarily partners in assessment of risk. The perspective of this paper is that of the oil and gas industry, in which the author's organization, Exxon Company, International, participates. The paper addresses what Exxon requires to assess and manage risk in its worldwide operations. The author is aware, however, through contacts with industry colleagues, that some of Exxon's initiatives are representative of similar actions being taken by others. 1992 is the European Year of Safety, Health and Hygiene, coinciding with the United Kingdom's Presidency of the European Council. It is also the year in which new 'goal-setting' regulations covering safety in the U.K. offshore oil industry were put forward by the Health and Safety Commission. These regulations, based largely on Lord Cullen's recommendations following the Piper Alpha tragedy, set the pace for safety in the British North Sea and will significantly impact the safety of offshore oil installations worldwide. The requirement for risk assessment, using a systematic process of analysing and evaluating risk, is a key component of this safety regime.

  9. RELEVANCE OF PROCESS RISK ASSESSMENT IN AIRLINES

    OpenAIRE

    Oksana G. Feoktistova; Igor K. Turkin; Sergey V. Barinov

    2017-01-01

    The notion of “the concept on assumed risk” that took over from the outdated concept of absolute security is analyzed, the increasing significance of operating risk assessment at the present stage is noted. Some basic risk assessment techniques are considered. Matrix technique of risk assessment is considered more thoroughly, and it may be used in risk assessment of airlines in the context of labour protection management system.The ability to correctly assess risks and develop appropriate pre...

  10. Economic assessment of flood forecasts for a risk-averse decision-maker

    Science.gov (United States)

    Matte, Simon; Boucher, Marie-Amélie; Boucher, Vincent; Fortier-Filion, Thomas-Charles

    2017-04-01

    A large effort has been made over the past 10 years to promote the operational use of probabilistic or ensemble streamflow forecasts. It has also been suggested in past studies that ensemble forecasts might possess a greater economic value than deterministic forecasts. However, the vast majority of recent hydro-economic literature is based on the cost-loss ratio framework, which might be appealing for its simplicity and intuitiveness. One important drawback of the cost-loss ratio is that it implicitly assumes a risk-neutral decision maker. By definition, a risk-neutral individual is indifferent to forecasts' sharpness: as long as forecasts agree with observations on average, the risk-neutral individual is satisfied. A risk-averse individual, however, is sensitive to the level of precision (sharpness) of forecasts. This person is willing to pay to increase his or her certainty about future events. In fact, this is how insurance companies operate: the probability of seeing one's house burn down is relatively low, so the expected cost related to such event is also low. However, people are willing to buy insurance to avoid the risk, however small, of loosing everything. Similarly, in a context where people's safety and property is at stake, the typical decision maker is more risk-averse than risk-neutral. Consequently, the cost-loss ratio is not the most appropriate tool to assess the economic value of flood forecasts. This presentation describes a more realistic framework for assessing the economic value of such forecasts for flood mitigation purposes. Borrowing from economics, the Constant Absolute Risk Aversion utility function (CARA) is the central tool of this new framework. Utility functions allow explicitly accounting for the level of risk aversion of the decision maker and fully exploiting the information related to ensemble forecasts' uncertainty. Three concurrent ensemble streamflow forecasting systems are compared in terms of quality (comparison with

  11. An abuse of risk assessment: how regulatory agencies improperly adopted LNT for cancer risk assessment.

    Science.gov (United States)

    Calabrese, Edward J

    2015-04-01

    The Genetics Panel of the National Academy of Sciences' Committee on Biological Effects of Atomic Radiation (BEAR) recommended the adoption of the linear dose-response model in 1956, abandoning the threshold dose-response for genetic risk assessments. This recommendation was quickly generalized to include somatic cells for cancer risk assessment and later was instrumental in the adoption of linearity for carcinogen risk assessment by the Environmental Protection Agency. The Genetics Panel failed to provide any scientific assessment to support this recommendation and refused to do so when later challenged by other leading scientists. Thus, the linearity model used in cancer risk assessment was based on ideology rather than science and originated with the recommendation of the NAS BEAR Committee Genetics Panel. Historical documentation in support of these conclusions is provided in the transcripts of the Panel meetings and in previously unexamined correspondence among Panel members.

  12. A framework for combining social impact assessment and risk assessment

    NARCIS (Netherlands)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify

  13. A framework for combining social impact assessment and risk assessment

    NARCIS (Netherlands)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-01-01

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify

  14. Risk indices in comparative risk assessment studies

    International Nuclear Information System (INIS)

    Hubert, P.

    1984-01-01

    More than a decade ago the development of comparative risk assessment studies aroused overwhelming interest. There was no doubt that data on the health and safety aspects of energy systems would greatly benefit, or even end, the debate on nuclear energy. Although such attempts are still strongly supported, the rose-coloured expectations of the early days have faded. The high uncertainties, and the contradictory aspect, of the first results might explain this evolution. The loose connection between the range of computed risk indices and the questions on which the debate was focused is another reason for this decline in interest. Important research work is being carried out aiming at reducing the different kinds of uncertainties. Rather than the uncertainties, the paper considers the meaning of available risk indices and proposes more significant indices with respect to the goals of risk assessment. First, the indices which are of frequent use in comparative studies are listed. The stress is put on a French comparative study from which most examples are drawn. Secondly, the increase in magnitude of the indices and the decrease in the attributability of the risk to a given system is shown to be a consequence of the trend towards more comprehensive analyses. Thirdly, the ambiguity of such indices as the collective occupational risk is underlined, and a possible solution is suggested. Whenever risk assessments are related to pragmatic decision making problems it is possible to find satisfactory risk indices. The development of cost-effectiveness analyses and the proposals for quantitative safety goals clearly demonstrate this point. In the field of comparison of social impacts some proposals are made, but there remain some gaps still to be filled. (author)

  15. Aspects regarding explosion risk assessment

    Directory of Open Access Journals (Sweden)

    Părăian Mihaela

    2017-01-01

    Full Text Available Explosive risk occurs in all activities involving flammable substances in the form of gases, vapors, mists or dusts which, in mixture with air, can generate an explosive atmosphere. As explosions can cause human losses and huge material damage, the assessment of the explosion risk and the establishment of appropriate measures to reduce it to acceptable levels according to the standards and standards in force is of particular importance for the safety and health of people and goods.There is no yet a recognized method of assessing the explosion risk, but regardless of the applied method, the likelihood of an explosive atmosphere occurrence has to be determined, together with the occurrence of an efficient ignition source and the magnitude of foreseeable consequences. In assessment processes, consequences analysis has a secondary importance since it’s likely that explosions would always involve considerable damage, starting from important material damages and up to human damages that could lead to death.The purpose of the work is to highlight the important principles and elements to be taken into account for a specific risk assessment. An essential element in assessing the risk of explosion in workplaces where explosive atmospheres may occur is technical installations and personal protective equipment (PPE that must be designed, manufactured, installed and maintained so that they cannot generate a source of ignition. Explosion prevention and protection requirements are governed by specific norms and standards, and a main part of the explosion risk assessment is related to the assessment of the compliance of the equipment / installation with these requirements.

  16. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.B.; Sigmon, C.F.

    1989-09-29

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges.

  17. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    International Nuclear Information System (INIS)

    Levine, M.B.; Sigmon, C.F.

    1989-01-01

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges

  18. Differences in Health Care Costs and Utilization among Adults with Selected Lifestyle-Related Risk Factors.

    Science.gov (United States)

    Tucker, Larry A.; Clegg, Alan G.

    2002-01-01

    Examined the relationship between lifestyle-related health risks and health care costs and utilization among young adults. Data collected at a primarily white collar worksite in over 2 years indicated that health risks, particularly obesity, stress, and general lifestyle, were significant predictors of health care costs and utilization among these…

  19. Probabilistic Risk Assessment for Astronaut Post Flight Bone Fracture

    Science.gov (United States)

    Lewandowski, Beth; Myers, Jerry; Licata, Angelo

    2015-01-01

    Introduction: Space flight potentially reduces the loading that bone can resist before fracture. This reduction in bone integrity may result from a combination of factors, the most common reported as reduction in astronaut BMD. Although evaluating the condition of bones continues to be a critical aspect of understanding space flight fracture risk, defining the loading regime, whether on earth, in microgravity, or in reduced gravity on a planetary surface, remains a significant component of estimating the fracture risks to astronauts. This presentation summarizes the concepts, development, and application of NASA's Bone Fracture Risk Module (BFxRM) to understanding pre-, post, and in mission astronaut bone fracture risk. The overview includes an assessment of contributing factors utilized in the BFxRM and illustrates how new information, such as biomechanics of space suit design or better understanding of post flight activities may influence astronaut fracture risk. Opportunities for the bone mineral research community to contribute to future model development are also discussed. Methods: To investigate the conditions in which spaceflight induced changes to bone plays a critical role in post-flight fracture probability, we implement a modified version of the NASA Bone Fracture Risk Model (BFxRM). Modifications included incorporation of variations in physiological characteristics, post-flight recovery rate, and variations in lateral fall conditions within the probabilistic simulation parameter space. The modeled fracture probability estimates for different loading scenarios at preflight and at 0 and 365 days post-flight time periods are compared. Results: For simple lateral side falls, mean post-flight fracture probability is elevated over mean preflight fracture probability due to spaceflight induced BMD loss and is not fully recovered at 365 days post-flight. In the case of more energetic falls, such as from elevated heights or with the addition of lateral movement

  20. Chlorine transportation risk assessment

    International Nuclear Information System (INIS)

    Lautkaski, Risto; Mankamo, Tuomas.

    1977-02-01

    An assessment has been made on the toxication risk of the population due to the bulk rail transportation of liquid chlorine in Finland. Fourteen typical rail accidents were selected and their probability was estimated using the accident file of the Finnish State Railways. The probability of a chlorine leak was assessed for each type of accident separately using four leak size categories. The assessed leakage probability was dominated by station accidents, especially by collisions of a chlorine tanker and a locomotive. Toxication hazard areas were estimated for the leak categories. A simple model was constructed to describe the centring of the densely populated areas along the railway line. A comparison was made between the obtained risk and some other risks including those due to nuclear reactor accidents. (author)

  1. Risk-Sensitive Multiagent Decision-Theoretic Planning Based on MDP and One-Switch Utility Functions

    Directory of Open Access Journals (Sweden)

    Wei Zeng

    2014-01-01

    Full Text Available In high stakes situations decision-makers are often risk-averse and decision-making processes often take place in group settings. This paper studies multiagent decision-theoretic planning under Markov decision processes (MDPs framework with considering the change of agent’s risk attitude as his wealth level varies. Based on one-switch utility function that describes agent’s risk attitude change with his wealth level, we give the additive and multiplicative aggregation models of group utility and adopt maximizing expected group utility as planning objective. When the wealth level approaches infinity, the characteristics of optimal policy are analyzed for the additive and multiplicative aggregation model, respectively. Then a backward-induction method is proposed to divide the wealth level interval from negative infinity to initial wealth level into subintervals and determine the optimal policy in states and subintervals. The proposed method is illustrated by numerical examples and the influences of agent’s risk aversion parameters and weights on group decision-making are also analyzed.

  2. Probabilistic risk assessment, Volume I

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    This book contains 158 papers presented at the International Topical Meeting on Probabilistic Risk Assessment held by the American Nuclear Society (ANS) and the European Nuclear Society (ENS) in Port Chester, New York in 1981. The meeting was second in a series of three. The main focus of the meeting was on the safety of light water reactors. The papers discuss safety goals and risk assessment. Quantitative safety goals, risk assessment in non-nuclear technologies, and operational experience and data base are also covered. Included is an address by Dr. Chauncey Starr

  3. Risk assessment in maritime transportation

    International Nuclear Information System (INIS)

    Soares, C. Guedes; Teixeira, A.P.

    2001-01-01

    A review is presented of different approaches to quantify the risk in maritime transportation. The discussion of several accident statistics provides a global assessment of the risk levels and its differentiation in ship types and main types of ship losses. Early studies in the probability of ship loss by foundering and capsizing are reviewed. The approaches used to assess the risk of structural design are addressed. Finally a brief account is given of recent development of using formal safety assessments to support decision making on legislation applicable internationally to maritime transportation

  4. Framework for ecological risk assessment

    International Nuclear Information System (INIS)

    Rodier, D.; Norton, S.

    1992-02-01

    Increased interest in ecological issues such as global climate change, habitat loss, acid deposition, reduced biological diversity, and the ecological impacts of pesticides and toxic chemicals prompts this U.S. Environmental Protection Agency (EPA) report, A Framework for Ecological Risk Assessment ('Framework Report'). The report describes basic elements, or a framework, for evaluating scientific information on the adverse effects of physical and chemical stressors on the environment. The framework offers starting principles and a simple structure as guidance for current ecological risk assessments and as a foundation for future EPA proposals for risk assessment guidelines

  5. Underreporting of nursing home utilization on the CMS-2728 in older incident dialysis patients and implications for assessing mortality risk.

    Science.gov (United States)

    Bowling, C Barrett; Zhang, Rebecca; Franch, Harold; Huang, Yijian; Mirk, Anna; McClellan, William M; Johnson, Theodore M; Kutner, Nancy G

    2015-03-21

    The usage of nursing home (NH) services is a marker of frailty among older adults. Although the Centers for Medicare & Medicaid Services (CMS) revised the Medical Evidence Report Form CMS-2728 in 2005 to include data collection on NH institutionalization, the validity of this item has not been reported. There were 27,913 patients ≥ 75 years of age with incident end-stage renal disease (ESRD) in 2006, which constituted our analysis cohort. We determined the accuracy of the CMS-2728 using a matched cohort that included the CMS Minimum Data Set (MDS) 2.0, often employed as a "gold standard" metric for identifying patients receiving NH care. We calculated sensitivity, specificity, positive predictive value (PPV), and negative predictive value (NPV) for the CMS-2728 NH item. Next, we compared characteristics and mortality risk by CMS-2728 and MDS NH status agreement. The sensitivity, specificity, PPV and NPV of the CMS-2728 for NH status were 33%, 97%, 80% and 79%, respectively. Compared to those without the MDS or CMS-2728 NH indicator (No MDS/No 2728), multivariable adjusted hazard ratios (95% confidence interval) for mortality associated with NH status were 1.55 (1.46 - 1.64) for MDS/2728, 1.48 (1.42 - 1.54) for MDS/No 2728, and 1.38 (1.25 - 1.52) for No MDS/2728. NH utilization was more strongly associated with mortality than other CMS-2728 items in the model. The CMS-2728 underestimated NH utilization among older adults with incident ESRD. The potential for misclassification may have important ramifications for assessing prognosis, developing advanced care plans and providing coordinated care.

  6. Evolution of strategic risks under future scenarios for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2016-01-01

    Integrated, long-term risk management in the water sector is poorly developed. Whilst scenario planning has been applied to singular issues (e.g. climate change), it often misses a link to risk management because the likelihood of impacts in the long-term are frequently unaccounted for in these analyses. Here we apply the morphological approach to scenario development for a case study utility, Empresa Portuguesa das Águas Livres (EPAL). A baseline portfolio of strategic risks threatening the achievement of EPAL's corporate objectives was evolved through the lens of three future scenarios, 'water scarcity', 'financial resource scarcity' and 'strong economic growth', built on drivers such as climate, demographic, economic, regulatory and technological changes and validated through a set of expert workshops. The results represent how the baseline set of risks might develop over a 30 year period, allowing threats and opportunities to be identified and enabling strategies for master plans to be devised. We believe this to be the first combined use of risk and futures methods applied to a portfolio of strategic risks in the water utility sector. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Strategy utilized for assessing baseline risks to human health from K-65 and metal oxide residues stored at the Fernald Site

    International Nuclear Information System (INIS)

    Harmon, J.E.; Janke, R.C.

    1995-01-01

    The U.S. Department of Energy (DOE) is responsible for cleanup activities at the Fernald Environmental Management Project (FEMP) site in southwestern Ohio. The 425-hectare site consists of a former 55-hectare Production Area, an adjacent Waste Storage Area and various support facilities. From 1952 until 1989, the FEMP processed uranium into metallic open-quotes feedclose quotes materials for other DOE facilities in the nation's defense program. In accordance with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the FEMP site is currently listed on the National Priorities List (NPL). To facilitate an expeditious cleanup effort, environmental issues associated with site cleanup are being managed under five operable units. This paper summarizes the risk assessment strategy employed to determine baseline human health risks associated with K-65 and metal oxide residues currently stored in Operable Unit 4. The K-65 and metal oxide residues were generated during the 1950s as a result of the extraction of uranium from uranium-bearing ores and concentrates. These residues are currently stored within Operable Unit 4 in concrete silos. Silos I and 2 contain approximately 6,120 cubic meters [m 3 ] (8,005 cubic yards [yd 3 ]) of K-65 residues, while silos 3 contains approximately 3890 m 3 (5,080 yd 3 ) of cold metal oxides. These concrete silos are beyond their design life and require remedial action. The risk assessment conducted for Operable Unit 4 constitutes the first detailed human health risk assessment to be approved by the Environmental Protection Agency (EPA) for the CERCLA clean-up effort at the FEMP Site. This paper discusses the FEMP's use of a Risk Information Quality Objective process in concert with the traditional risk assessment approach to determine baseline risk to human health and the environment posed by Operable Unit 4. A summary of the baseline risks to human health is also presented

  8. Risk assessment instruments in clinical practice.

    Science.gov (United States)

    Côté, Gilles; Crocker, Anne G; Nicholls, Tonia L; Seto, Michael C

    2012-04-01

    To determine whether the items in one of the most widely validated instruments of violence risk assessment, the Historical-Clinical-Risk Management-20 (HCR-20), are used in review board hearings to assess the risk of violence by people found Not Criminally Responsible on account of Mental Disorder (NCRMD). This study was conducted from October 2004 to August 2006 in Quebec's sole forensic psychiatric hospital and 2 large civil psychiatric hospitals designated for the care of people declared NCRMD in the Montreal metropolitan area. The risk assessments presented by clinicians at annual review board hearings and the boards' rationale for the release or detention of people found NCRMD were contrasted with the risk assessments conducted by the research team using the HCR-20. The final sample was comprised of 96 men. Very few of the risk factors identified by prior research (HCR-20 items) were mentioned in the hearing process, whether in clinical reports, discussions during the hearing, or in the disposition justification. The findings confirm that there remains a significant gap between research evidence and risk assessment practice.

  9. Reevaluating Interrater Reliability in Offender Risk Assessment

    NARCIS (Netherlands)

    van der Knaap, L.M.; Leenarts, L.E.W.; Born, M.P.; Oosterveld, P.

    2012-01-01

    Offender risk and needs assessment, one of the pillars of the risk-need-responsivity model of offender rehabilitation, usually depends on raters assessing offender risk and needs. The few available studies of interrater reliability in offender risk assessment are, however, limited in the

  10. Results of a recent crud/corrosion fuel risk assessment at a U.S. PWR

    International Nuclear Information System (INIS)

    Lamanna, Larry; Pop, Mike; Gregorich, Carola; Harne, Richard; Jones, John

    2012-09-01

    In order to avoid potential fuel reliability issues, specifically crud-related issues, it is necessary to achieve and maintain a crud safe environment. Therefore, the ability to confidently predict risks associated with crud deposition on fuel becomes critically important. AREVA is applying its cutting-edge PWR Fuel Crud (Primary System corrosion products)/Corrosion Tools, i.e. COBRA-FLX (subchannel-by-subchannel T/H tool) coupled with FDIC (crud deposition tool) to subsequently perform PWR Fuel Crud /Corrosion risk assessments for operating plants in the US. After describing the method, the result of one of these assessments is presented for an operating plant in the US that has experienced recent crud observations/concerns. Both Crud Induced Localized Corrosion (CILC) and Crud Induced Power Shift (CIPS) risk assessment methods, as applied to the upcoming cycle (Cycle N), were compared to the current/on-going cycle (Cycle N-1) and to the previous cycle (Cycle N-2). The results allowed the Utility to consider crud risk management changes associated with the upcoming cycle (Cycle-N). Benchmarking of the AREVA tools, using the plant-specific crud information gained from the crud sampling/characterization for the Unit will be presented. The CIPS analysis references boron loading and the amount of insoluble iron-nickel-borates predicted for Cycles N-2, N-1, and N. The results of the CILC evaluation reference FDIC-predicted crud thickness, cladding temperature under deposit, evolution of CILC bearing species and lithium concentration in the zirconium oxide layer. The approach taken by AREVA during the evaluation was to consider both 'risk' and 'margin' to fuel performance impact caused by crud deposits. The conclusion of the assessment, illustrated by the results presented in this paper, is that the example Plant has sufficient margin in worst case conditions for CIPS and CILC risk in Cycle N, based on Cycle N-1 and Cycle N-2 conditions and behavior

  11. Quantitative risk assessment system (QRAS)

    Science.gov (United States)

    Weinstock, Robert M (Inventor); Smidts, Carol S (Inventor); Mosleh, Ali (Inventor); Chang, Yung-Hsien (Inventor); Swaminathan, Sankaran (Inventor); Groen, Francisco J (Inventor); Tan, Zhibin (Inventor)

    2001-01-01

    A quantitative risk assessment system (QRAS) builds a risk model of a system for which risk of failure is being assessed, then analyzes the risk of the system corresponding to the risk model. The QRAS performs sensitivity analysis of the risk model by altering fundamental components and quantifications built into the risk model, then re-analyzes the risk of the system using the modifications. More particularly, the risk model is built by building a hierarchy, creating a mission timeline, quantifying failure modes, and building/editing event sequence diagrams. Multiplicities, dependencies, and redundancies of the system are included in the risk model. For analysis runs, a fixed baseline is first constructed and stored. This baseline contains the lowest level scenarios, preserved in event tree structure. The analysis runs, at any level of the hierarchy and below, access this baseline for risk quantitative computation as well as ranking of particular risks. A standalone Tool Box capability exists, allowing the user to store application programs within QRAS.

  12. Ecosystem services as assessment endpoints for ecological risk assessment.

    Science.gov (United States)

    Munns, Wayne R; Rea, Anne W; Suter, Glenn W; Martin, Lawrence; Blake-Hedges, Lynne; Crk, Tanja; Davis, Christine; Ferreira, Gina; Jordan, Steve; Mahoney, Michele; Barron, Mace G

    2016-07-01

    Ecosystem services are defined as the outputs of ecological processes that contribute to human welfare or have the potential to do so in the future. Those outputs include food and drinking water, clean air and water, and pollinated crops. The need to protect the services provided by natural systems has been recognized previously, but ecosystem services have not been formally incorporated into ecological risk assessment practice in a general way in the United States. Endpoints used conventionally in ecological risk assessment, derived directly from the state of the ecosystem (e.g., biophysical structure and processes), and endpoints based on ecosystem services serve different purposes. Conventional endpoints are ecologically important and susceptible entities and attributes that are protected under US laws and regulations. Ecosystem service endpoints are a conceptual and analytical step beyond conventional endpoints and are intended to complement conventional endpoints by linking and extending endpoints to goods and services with more obvious benefit to humans. Conventional endpoints can be related to ecosystem services even when the latter are not considered explicitly during problem formulation. To advance the use of ecosystem service endpoints in ecological risk assessment, the US Environmental Protection Agency's Risk Assessment Forum has added generic endpoints based on ecosystem services (ES-GEAE) to the original 2003 set of generic ecological assessment endpoints (GEAEs). Like conventional GEAEs, ES-GEAEs are defined by an entity and an attribute. Also like conventional GEAEs, ES-GEAEs are broadly described and will need to be made specific when applied to individual assessments. Adoption of ecosystem services as a type of assessment endpoint is intended to improve the value of risk assessment to environmental decision making, linking ecological risk to human well-being, and providing an improved means of communicating those risks. Integr Environ Assess Manag

  13. Leaching characteristics, ecotoxicity, and risk assessment based management of mine wastes

    Science.gov (United States)

    Kim, J.; Ju, W. J.; Jho, E. H.; Nam, K.; Hong, J. K.

    2016-12-01

    Mine wastes generated during mining activities in metal mines generally contain high concentrations of metals that may impose toxic effects to surrounding environment. Thus, it is necessary to properly assess the mining-impacted landscapes for management. The study investigated leaching characteristics, potential environmental effects, and human health risk of mine wastes from three different metal mines in South Korea (molybdenum mine, lead-zinc mine, and magnetite mine). The heavy metal concentrations in the leachates obtained by using the Korean Standard Test Method for Solid Wastes (STM), Toxicity Characteristics Leaching Procedure (TCLP), and Synthetic Precipitation Leaching Procedure (SPLP) met the Korea Waste Control Act and the USEPA region 3 regulatory levels accordingly, even though the mine wastes contained high concentrations of metals. Assuming that the leachates may get into nearby water sources, the leachate toxicity was tested using Daphnia Magna. The toxic unit (TU) values after 24 h and 48 h exposure of all the mine wastes tested met the Korea Allowable Effluent Water Quality Standards (TUwaste may have long-term toxic effects (TU>1 for the eluent at L/S of 30) implying that the long-term effect of mine wastes left in mining areas need to be assessed. Considering reuse of mine wastes as a way of managing mine wastes, the human health risk assessment of reusing the lead-zinc mine waste in industrial areas was carried out using the bioavailable fraction of the heavy metals contained in the mine wastes, which was determined by using the Solubility/Bioavailability Research Consortium method. There may be potential carcinogenic risk (9.7E-05) and non-carcinogenic risk (HI, Hazard Index of 1.0E+00) as CR≧1.0E-05 has carcinogenic risk and HI≧1.0E+00 has non-carcinogenic risk. Overall, this study shows that not only the concentration-based assessment but ecological toxic effect and human health risk based assessments can be utilized for mining

  14. Using toxicokinetic-toxicodynamic modeling as an acute risk assessment refinement approach in vertebrate ecological risk assessment.

    Science.gov (United States)

    Ducrot, Virginie; Ashauer, Roman; Bednarska, Agnieszka J; Hinarejos, Silvia; Thorbek, Pernille; Weyman, Gabriel

    2016-01-01

    Recent guidance identified toxicokinetic-toxicodynamic (TK-TD) modeling as a relevant approach for risk assessment refinement. Yet, its added value compared to other refinement options is not detailed, and how to conduct the modeling appropriately is not explained. This case study addresses these issues through 2 examples of individual-level risk assessment for 2 hypothetical plant protection products: 1) evaluating the risk for small granivorous birds and small omnivorous mammals of a single application, as a seed treatment in winter cereals, and 2) evaluating the risk for fish after a pulsed treatment in the edge-of-field zone. Using acute test data, we conducted the first tier risk assessment as defined in the European Food Safety Authority (EFSA) guidance. When first tier risk assessment highlighted a concern, refinement options were discussed. Cases where the use of models should be preferred over other existing refinement approaches were highlighted. We then practically conducted the risk assessment refinement by using 2 different models as examples. In example 1, a TK model accounting for toxicokinetics and relevant feeding patterns in the skylark and in the wood mouse was used to predict internal doses of the hypothetical active ingredient in individuals, based on relevant feeding patterns in an in-crop situation, and identify the residue levels leading to mortality. In example 2, a TK-TD model accounting for toxicokinetics, toxicodynamics, and relevant exposure patterns in the fathead minnow was used to predict the time-course of fish survival for relevant FOCUS SW exposure scenarios and identify which scenarios might lead to mortality. Models were calibrated using available standard data and implemented to simulate the time-course of internal dose of active ingredient or survival for different exposure scenarios. Simulation results were discussed and used to derive the risk assessment refinement endpoints used for decision. Finally, we compared the

  15. Hanford Site baseline risk assessment methodology

    International Nuclear Information System (INIS)

    1993-03-01

    This methodology has been developed to prepare human health and environmental evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act remedial investigations (RIs) and the Resource Conservation and Recovery Act facility investigations (FIs) performed at the Hanford Site pursuant to the Hanford Federal Facility Agreement and Consent Order referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies Site-specific risk assessment considerations and integrates them with approaches for evaluating human and environmental risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site

  16. Assessment of Research Needs for Coal Utilization

    Energy Technology Data Exchange (ETDEWEB)

    Penner, S.S.

    1983-08-01

    The Coal Combustion and Applications Working Group (CCAWG), at the request of J.W. Mares (Assistant Secretary for Fossil Energy) and A.W. Trivelpiece (Director, Office of Energy Research), has reviewed and evaluated the U.S. programs on coal combustion and utilization. The important topical areas of coal gasification and coal liquefaction have been deliberately excluded because R and D needs for these technologies were reviewed previously by the DOE Fossil Energy Research Working Group. The CCAWG studies were performed in order to provide an independent assessment of research areas that affect prospects for augmented coal utilization. In this report, we summarize the findings and research recommendations of CCAWG.

  17. RELEVANCE OF PROCESS RISK ASSESSMENT IN AIRLINES

    Directory of Open Access Journals (Sweden)

    Oksana G. Feoktistova

    2017-01-01

    Full Text Available The notion of “the concept on assumed risk” that took over from the outdated concept of absolute security is analyzed, the increasing significance of operating risk assessment at the present stage is noted. Some basic risk assessment techniques are considered. Matrix technique of risk assessment is considered more thoroughly, and it may be used in risk assessment of airlines in the context of labour protection management system.The ability to correctly assess risks and develop appropriate precautionary measures will allow airlines to avoid incidents leading to drastic consequences for staff, as well as to direct and indirect costs for the enterprise among which there could be singled out both direct property damage and loss of profit and expenses connected to incident investigation, penalty and compensation payment, loss of business reputation and so on. To reduce the rate of accidents and to develop safe activities skills for airlines staff a risk assessment chart is supposed to be implemented, which will be an efficient accidents prevention involving the staff in the process and making them follow safe working conditions.Process risk assessment is an integral part of assessment of the whole enterprise activity and work efficiency of a department and particular workers evaluation system. Labour protection activity should be based on risk identification and its control. Risk assessment is a keystone of labour protection activity planning.

  18. Risk assessment of river-type hydropower plants using fuzzy logic approach

    International Nuclear Information System (INIS)

    Kucukali, Serhat

    2011-01-01

    In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk assessment and expert judgments were utilized instead of probabilistic reasoning. The methodology is a multi-criteria decision analysis, which provides a flexible and easily understood way to analyze project risks. The external risks, which are partly under the control of companies, were considered in the model. A total of eleven classes of risk factors were determined based on the expert interviews, field studies and literature review as follows: site geology, land use, environmental issues, grid connection, social acceptance, macroeconomic, natural hazards, change of laws and regulations, terrorism, access to infrastructure and revenue. The relative importance of risk factors was determined from the survey results. The survey was conducted with the experts that have experience in the construction of river-type hydropower schemes. The survey results revealed that the site geology and environmental issues were considered as the most important risks. The new risk assessment method enabled a Risk Index (R) value to be calculated, establishing a 4-grade evaluation system. The proposed risk analysis will give investors a more rational basis to make decisions and it can prevent cost and schedule overruns. - Highlights: → A new methodology is proposed for risk rating of river-type hydropower plant projects. → The relative importance of the risk factors was determined from the expert judgments. → The most concerned risks have been found as environmental issues and site geology. → The proposed methodology was tested on a real case. → The proposed risk analysis will give investors a more rational basis.

  19. Statistical aspects of carbon fiber risk assessment modeling. [fire accidents involving aircraft

    Science.gov (United States)

    Gross, D.; Miller, D. R.; Soland, R. M.

    1980-01-01

    The probabilistic and statistical aspects of the carbon fiber risk assessment modeling of fire accidents involving commercial aircraft are examined. Three major sources of uncertainty in the modeling effort are identified. These are: (1) imprecise knowledge in establishing the model; (2) parameter estimation; and (3)Monte Carlo sampling error. All three sources of uncertainty are treated and statistical procedures are utilized and/or developed to control them wherever possible.

  20. Uncertainty quantification in flood risk assessment

    Science.gov (United States)

    Blöschl, Günter; Hall, Julia; Kiss, Andrea; Parajka, Juraj; Perdigão, Rui A. P.; Rogger, Magdalena; Salinas, José Luis; Viglione, Alberto

    2017-04-01

    Uncertainty is inherent to flood risk assessments because of the complexity of the human-water system, which is characterised by nonlinearities and interdependencies, because of limited knowledge about system properties and because of cognitive biases in human perception and decision-making. On top of the uncertainty associated with the assessment of the existing risk to extreme events, additional uncertainty arises because of temporal changes in the system due to climate change, modifications of the environment, population growth and the associated increase in assets. Novel risk assessment concepts are needed that take into account all these sources of uncertainty. They should be based on the understanding of how flood extremes are generated and how they change over time. They should also account for the dynamics of risk perception of decision makers and population in the floodplains. In this talk we discuss these novel risk assessment concepts through examples from Flood Frequency Hydrology, Socio-Hydrology and Predictions Under Change. We believe that uncertainty quantification in flood risk assessment should lead to a robust approach of integrated flood risk management aiming at enhancing resilience rather than searching for optimal defense strategies.

  1. Development of a risk assessment tool for volcanic urban environments: RiskScape and the Auckland Volcanic Field, New Zealand

    Science.gov (United States)

    Deligne, N. I.; Leonard, G.; King, A.; Wilson, G.; Wilson, T.; Lindsay, J. M.

    2013-12-01

    Auckland city, home to a third of New Zealand's population, is situated on top of the Auckland Volcanic Field (AVF), which last erupted roughly 500 years ago. Since 2008, the Determining Volcanic Risk in Auckland (DEVORA) program has investigated the geologic context of the AVF, improved timing constraints of past eruptions, explored possible tempo-spatial-volume eruption trends, and identified likely styles and hazards of future eruptions. DEVORA is now moving into development of risk and societal models for Auckland. The volcanic module of RiskScape, a multi-hazard risk assessment tool developed by Crown Research Institutes GNS Science and NIWA, will be expanded and used to model risk and impact to the built environment and population caused by a future AVF eruption. RiskScape models casualties, damage and disruption caused by various hazards, the resulting reduced functionality of assets, and associated clean up costs. A strength of RiskScape is that the effect of various mitigation strategies can be explored by strengthening asset attributes and examining resulting changes in the output risk evaluation. We present our framework for building a volcano hazard exposure module for RiskScape along with our approach for assessing asset vulnerability through the development of fragility functions. We also present the framework for engagement with regional Auckland stakeholders, including representatives of local and regional governments and utility companies, to identify complementary needs to ensure that final risk products are relevant and useable by end users.

  2. Utility assessment: the market for the high temperature gas-cooled reactor and the incentives for its utilization

    International Nuclear Information System (INIS)

    1980-09-01

    The approach taken in this assessment is one in which the HTGR is evaluated from the perspective of its eventual users and operators - the utility industry. Section 2 of this report presents projections of future electrical and process heat energy demands in order to attempt to quantify the potential market for the HTGR. Section 3 provides an analysis of the effects of the HTGR on specific utility systems as well as extrapolated results on a national basis. Section 4 presents assessments of the various recognized incentives for HTGR commercialization. Sections 5, 6, and 7 present technical descriptions, and economic and market assessments of each of the three reference HTGR systems, namely the HTGR Steam Cycle, Gas Turbine, and Reformer

  3. Reevaluating Interrater Reliability in Offender Risk Assessment

    Science.gov (United States)

    van der Knaap, Leontien M.; Leenarts, Laura E. W.; Born, Marise Ph.; Oosterveld, Paul

    2012-01-01

    Offender risk and needs assessment, one of the pillars of the risk-need-responsivity model of offender rehabilitation, usually depends on raters assessing offender risk and needs. The few available studies of interrater reliability in offender risk assessment are, however, limited in the generalizability of their results. The present study…

  4. Screening Risk Assessment for Possible Radionuclides in the Amchitka Marine Environment

    Energy Technology Data Exchange (ETDEWEB)

    NNSA/NV

    2002-10-31

    As part of its environmental stewardship program the U.S. Department of Energy (DOE) is reevaluating three sites where underground nuclear tests were conducted in the deep subsurface of Amchitka Island, Alaska. The tests (i.e., Long Shot, Milrow, and Cannikin) were conducted in 1965, 1969, and 1971, respectively. Extensive investigations were conducted on these tests and their effect on the environment. Evaluations at the time of testing indicated limited release of radionuclides and absence of risk related to the testing; however, these are being reevaluated under the current DOE environmental stewardship program. A screening risk assessment of potential radionuclide release into the marine environment is an important part of this reevaluation. The risk assessment is one of three interrelated activities: a groundwater model and this screening risk assessment, both of which guide the decisions in the third activity, the site closure plan. Thus, the overall objective of the work is to understand, and subsequently manage, any risk to humans and the environment through a closure and long-term stewardship plan. The objective of this screening risk assessment is to predict whether possible releases of radionuclides at the ocean floor would represent potential risks to Native Alaskans by consumption of marine subsistence species. In addition, risks were predicted for consumers of commercial catches of marine organisms. These risks were calculated beginning with estimates of possible radionuclide release at the seafloor (from a groundwater modeling study), into the seawater, through possible uptake by marine organisms, and finally possible consumption by humans. The risk assessment model has 11 elements, progressing from potential release at the seafloor through water and food chains to human intake. Data for each of these elements were systematically found and synthesized from many sources, and represent the best available knowledge. Whenever precise data were lacking

  5. EIF onshore discharges : a quantitative environmental risk assessment tool for onshore facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hagemann, R.; Smit, M.G.D.; Frost, T.K. [Statoil ASA, Stavenger (Norway); Firth, S.K. [Firth Consultants, Bristol (United Kingdom); Stone, K. [WorleyParsons, Victoria, BC (Canada)

    2009-07-01

    The proper management of environmental risk is a key requirement of StatoilHydro's governing documents and is a key consideration in all phases of StatoilHydro's activities. In order to help manage risks in an effective and sustainable manner, StatoilHydro has led the development of the environmental impact factor (EIF) risk assessment tool. The EIF is utilized by all operators on the Norwegian Continental Shelf for reporting continuous improvements in produced water management to the authorities. The EIF concept has also been applied to evaluate environmental risk from air emissions, offshore oil spills and drilling discharges, discharges from onshore facilities to sea and discharges and spills from onshore installations. In order to identify the remaining hypothetical risk from a new facility, optimized with respect to environmental protection, this paper presented a case study, where the tool was applied to an oil sands steam assisted gravity drainage facility in Alberta. The paper discussed the EIF model and results of the case study. It was concluded that as a result of the use of generic principles for environmental risk assessment, combined with databases with parameter information for common soil and aquifer types, the EIF tool could be applied to any site ranging from wetlands to deserts. 5 refs., 2 tabs., 3 figs.

  6. Enhancing the ecological risk assessment process.

    Science.gov (United States)

    Dale, Virginia H; Biddinger, Gregory R; Newman, Michael C; Oris, James T; Suter, Glenn W; Thompson, Timothy; Armitage, Thomas M; Meyer, Judith L; Allen-King, Richelle M; Burton, G Allen; Chapman, Peter M; Conquest, Loveday L; Fernandez, Ivan J; Landis, Wayne G; Master, Lawrence L; Mitsch, William J; Mueller, Thomas C; Rabeni, Charles F; Rodewald, Amanda D; Sanders, James G; van Heerden, Ivor L

    2008-07-01

    The Ecological Processes and Effects Committee of the US Environmental Protection Agency Science Advisory Board conducted a self-initiated study and convened a public workshop to characterize the state of the ecological risk assessment (ERA), with a view toward advancing the science and application of the process. That survey and analysis of ERA in decision making shows that such assessments have been most effective when clear management goals were included in the problem formulation; translated into information needs; and developed in collaboration with decision makers, assessors, scientists, and stakeholders. This process is best facilitated when risk managers, risk assessors, and stakeholders are engaged in an ongoing dialogue about problem formulation. Identification and acknowledgment of uncertainties that have the potential to profoundly affect the results and outcome of risk assessments also improves assessment effectiveness. Thus we suggest 1) through peer review of ERAs be conducted at the problem formulation stage and 2) the predictive power of risk-based decision making be expanded to reduce uncertainties through analytical and methodological approaches like life cycle analysis. Risk assessment and monitoring programs need better integration to reduce uncertainty and to evaluate risk management decision outcomes. Postdecision audit programs should be initiated to evaluate the environmental outcomes of risk-based decisions. In addition, a process should be developed to demonstrate how monitoring data can be used to reduce uncertainties. Ecological risk assessments should include the effects of chemical and nonchemical stressors at multiple levels of biological organization and spatial scale, and the extent and resolution of the pertinent scales and levels of organization should be explicitly considered during problem formulation. An approach to interpreting lines of evidence and weight of evidence is critically needed for complex assessments, and it would

  7. Probabilistic Seismic Risk Assessment in Manizales, Colombia:Quantifying Losses for Insurance Purposes

    Institute of Scientific and Technical Information of China (English)

    Mario A.Salgado-Gálvez; Gabriel A.Bernal; Daniela Zuloaga; Mabel C.Marulanda; Omar-Darío Cardona; Sebastián Henao

    2017-01-01

    A fully probabilistic seismic risk assessment was developed in Manizales,Colombia,considering assets of different types.The first type includes elements that are part of the water and sewage network,and the second type includes public and private buildings.This assessment required the development of a probabilistic seismic hazard analysis that accounts for the dynamic soil response,assembling high resolution exposure databases,and the development of damage models for different types of elements.The economic appraisal of the exposed assets was developed together with specialists of the water utilities company of Manizales and the city administration.The risk assessment was performed using several Comprehensive Approach to Probabilistic Risk Assessment modules as well as the R-System,obtaining results in terms of traditional metrics such as loss exceedance curve,average annual loss,and probable maximum loss.For the case of pipelines,repair rates were also estimated.The results for the water and sewage network were used in activities related to the expansion and maintenance strategies,as well as for the exploration of financial retention and transfer alternatives using insurance schemes based on technical,probabilistic,and prospective damage and loss estimations.In the case of the buildings,the results were used in the update of the technical premium values of the existing collective insurance scheme.

  8. Utility of Eating Assessment Tool-10 in Predicting Aspiration in Patients with Unilateral Vocal Fold Paralysis.

    Science.gov (United States)

    Zuniga, Steven A; Ebersole, Barbara; Jamal, Nausheen

    2018-03-01

    Objective Examine the incidence of penetration/aspiration in patients with unilateral vocal fold immobility and investigate the relationship with self-reported perception of dysphagia. Study Design Case series with chart review. Setting Academic cancer center. Subjects and Methods Adult patients with unilateral vocal fold immobility diagnosed between 2014 and 2016 were reviewed. Patients were stratified into an aspiration group and a nonaspiration group using objective findings on flexible endoscopic evaluation of swallowing, as scored using Rosenbek's Penetration Aspiration Scale. Objective findings were compared to patient perception of dysphagia. Bivariate linear correlation analysis was performed to evaluate correlation between Eating Assessment Tool-10 scores and presence of aspiration. Tests of diagnostic accuracy were calculated to investigate the predictive value of Eating Assessment Tool-10 scores >9 on aspiration risk. Results Of the 35 patients with new-onset unilateral vocal fold immobility were evaluated, 25.7% (9/35) demonstrated tracheal aspiration. Mean ± SD Eating Assessment Tool-10 scores were 19.2 ± 13.7 for aspirators and 7.0 ± 7.8 for nonaspirators ( P = .016). A statistically significant correlation was demonstrated between increasing Eating Assessment Tool-10 scores and Penetration Aspiration Scale scores ( r = 0.511, P = .002). Diagnostic accuracy analysis for aspiration risk in patients with an Eating Assessment Tool-10 score >9 revealed a sensitivity of 77.8% and a specificity of 73.1%. Conclusion Patient perception of swallowing difficulty may have utility in predicting aspiration risk. An EAT-10 of >9 in patients with unilateral vocal fold immobility may portend up to a 5 times greater risk of aspiration. Routine swallow testing to assess for penetration/aspiration may be indicated in patients with unilateral vocal fold immobility.

  9. Assessing risks to fish populations near a proposed disposal facility for used nuclear fuel

    International Nuclear Information System (INIS)

    Hart, D.; Miesenheimer, P.; Hull, R.

    1995-01-01

    The concept of used nuclear fuel disposal in the Canadian Shield is currently undergoing a federal environmental assessment review process. As part of this review, potential risks to brook trout populations in the vicinity of such an underground repository were considered. Chemical fate, transport and exposure models have been utilized to estimate the dose rates from released radionuclides and other fuel constituents, and these likely will not be sufficient to harm fish in nearby streams. However, other stressors such as habitat alteration (e.g., loss of upwelling) and/or fishing pressure associated with increased public access could have significant population impacts if the site is located in a pristine northern region. Population models are utilized to explore the risks of local population reduction for different combinations of fishing pressure and habitat degradation

  10. A framework for combining social impact assessment and risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mahmoudi, Hossein, E-mail: mahmoudi@uni-hohenheim.de [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Environmental Sciences Research Institute, Shahid Beheshti University, G.C. (Iran, Islamic Republic of); Renn, Ortwin [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany); Vanclay, Frank [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands); Hoffmann, Volker [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Karami, Ezatollah [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)

    2013-11-15

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

  11. A framework for combining social impact assessment and risk assessment

    International Nuclear Information System (INIS)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-01-01

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary

  12. Risk assessment [Chapter 9

    Science.gov (United States)

    Dennis S. Ojima; Louis R. Iverson; Brent L. Sohngen; James M. Vose; Christopher W. Woodall; Grant M. Domke; David L. Peterson; Jeremy S. Littell; Stephen N. Matthews; Anantha M. Prasad; Matthew P. Peters; Gary W. Yohe; Megan M. Friggens

    2014-01-01

    What is "risk" in the context of climate change? How can a "risk-based framework" help assess the effects of climate change and develop adaptation priorities? Risk can be described by the likelihood of an impact occurring and the magnitude of the consequences of the impact (Yohe 2010) (Fig. 9.1). High-magnitude impacts are always...

  13. Risk assessment - black art or science?

    International Nuclear Information System (INIS)

    Moore, G.

    1988-01-01

    Measures of risk can be divided into two categories, those that observe or calculate the risk of a process or project, and those that rely on the level of risk as perceived by the people during the assessment. Collection of data of accidents (where cause and effect are obvious) and experiments on animals which can then be extrapolated to humans, are two ways of risk assessment. Mathematical models and computerized simulations, using either fault tree analysis or Monte Carlo methods are explained simply. Using these methods, experts are able to perceive risk fairly realistically. However, the general public's perception of risk is often quite different, as potential risk is assessed in different ways. The concept of tolerable risk is considered, particularly with reference to nuclear reactors such as Sizewell-B. The need to inform the public of safeguards and safety procedures so they have a better understanding of the risks of nuclear power is stressed. (U.K.)

  14. Creating New Incentives for Risk Identification and Insurance Process for the Electric Utility Industry (initial award through Award Modification 2); Energy & Risk Transfer Assessment (Award Modifications 3 - 6)

    Energy Technology Data Exchange (ETDEWEB)

    Michael Ebert

    2008-02-28

    This is the final report for the DOE-NETL grant entitled 'Creating New Incentives for Risk Identification & Insurance Processes for the Electric Utility Industry' and later, 'Energy & Risk Transfer Assessment'. It reflects work done on projects from 15 August 2004 to 29 February 2008. Projects were on a variety of topics, including commercial insurance for electrical utilities, the Electrical Reliability Organization, cost recovery by Gulf State electrical utilities after major hurricanes, and review of state energy emergency plans. This Final Technical Report documents and summarizes all work performed during the award period, which in this case is from 15 August 2004 (date of notification of original award) through 29 February 2008. This report presents this information in a comprehensive, integrated fashion that clearly shows a logical and synergistic research trajectory, and is augmented with findings and conclusions drawn from the research as a whole. Four major research projects were undertaken and completed during the 42 month period of activities conducted and funded by the award; these are: (1) Creating New Incentives for Risk Identification and Insurance Process for the Electric Utility Industry (also referred to as the 'commercial insurance' research). Three major deliverables were produced: a pre-conference white paper, a two-day facilitated stakeholders workshop conducted at George Mason University, and a post-workshop report with findings and recommendations. All deliverables from this work are published on the CIP website at http://cipp.gmu.edu/projects/DoE-NETL-2005.php. (2) The New Electric Reliability Organization (ERO): an examination of critical issues associated with governance, standards development and implementation, and jurisdiction (also referred to as the 'ERO study'). Four major deliverables were produced: a series of preliminary memoranda for the staff of the Office of Electricity Delivery and

  15. Strategy utilized for assessing baseline risks to human health from K-65 and metal oxide residues stored at the Fernald Site

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, J.E. [FERMCO, Cincinnati, OH (United States). Fernald Environmental Management Project; Janke, R.C.

    1995-04-01

    The U.S. Department of Energy (DOE) is responsible for cleanup activities at the Fernald Environmental Management Project (FEMP) site in southwestern Ohio. The 425-hectare site consists of a former 55-hectare Production Area, an adjacent Waste Storage Area and various support facilities. From 1952 until 1989, the FEMP processed uranium into metallic {open_quotes}feed{close_quotes} materials for other DOE facilities in the nation`s defense program. In accordance with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the FEMP site is currently listed on the National Priorities List (NPL). To facilitate an expeditious cleanup effort, environmental issues associated with site cleanup are being managed under five operable units. This paper summarizes the risk assessment strategy employed to determine baseline human health risks associated with K-65 and metal oxide residues currently stored in Operable Unit 4. The K-65 and metal oxide residues were generated during the 1950s as a result of the extraction of uranium from uranium-bearing ores and concentrates. These residues are currently stored within Operable Unit 4 in concrete silos. Silos I and 2 contain approximately 6,120 cubic meters [m{sup 3}] (8,005 cubic yards [yd{sup 3}]) of K-65 residues, while silos 3 contains approximately 3890 m{sup 3} (5,080 yd{sup 3}) of cold metal oxides. These concrete silos are beyond their design life and require remedial action. The risk assessment conducted for Operable Unit 4 constitutes the first detailed human health risk assessment to be approved by the Environmental Protection Agency (EPA) for the CERCLA clean-up effort at the FEMP Site. This paper discusses the FEMP`s use of a Risk Information Quality Objective process in concert with the traditional risk assessment approach to determine baseline risk to human health and the environment posed by Operable Unit 4. A summary of the baseline risks to human health is also presented.

  16. Concerning ethical risk assessment

    International Nuclear Information System (INIS)

    Boeckle, F.

    1991-01-01

    After a fundamental consideration of the concept of responsibility and 'long-term responsibility' for late sequelae, the problems of an ehtical assessment of risks were illustrated: The concept of risk itself poses three problems - predicting the probability of occurrence, assessing the damage = subjective classification of the degree of damage, determining whether the advantages outweigh the risks. It is not possible to weigh the advantages and risks against each other without assessing the goals and the priorities which have been set. Here ethics is called for, because it concerns itself with the reasonableness of evaluative decisions. Its task is to enable us to become aware of and comprehend our system of values in all of its complexity in reference to real life. Ethics can only fulfill its task if it helps us to adopt an integral perspective, i.e. if it centers on the human being. 'One must assess all technical and economic innovations in terms of whether they are beneficial to the development of mankind on a long-term basis. They are only to be legitimized insofar as they prove themselves to be a means of liberating mankind and contributing to his sense of dignity and identity, as a means of bringing human beings together and encouraging them to care for one another, and as a means of protecting the natural basis of our existence. (orig./HSCH) [de

  17. Source-term development for a contaminant plume for use by multimedia risk assessment models

    International Nuclear Information System (INIS)

    Whelan, Gene; McDonald, John P.; Taira, Randal Y.; Gnanapragasam, Emmanuel K.; Yu, Charley; Lew, Christine S.; Mills, William B.

    1999-01-01

    Multimedia modelers from the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) are collaborating to conduct a comprehensive and quantitative benchmarking analysis of four intermedia models: DOE's Multimedia Environmental Pollutant Assessment System (MEPAS), EPA's MMSOILS, EPA's PRESTO, and DOE's RESidual RADioactivity (RESRAD). These models represent typical analytically, semi-analytically, and empirically based tools that are utilized in human risk and endangerment assessments for use at installations containing radioactive and/or hazardous contaminants. Although the benchmarking exercise traditionally emphasizes the application and comparison of these models, the establishment of a Conceptual Site Model (CSM) should be viewed with equal importance. This paper reviews an approach for developing a CSM of an existing, real-world, Sr-90 plume at DOE's Hanford installation in Richland, Washington, for use in a multimedia-based benchmarking exercise bet ween MEPAS, MMSOILS, PRESTO, and RESRAD. In an unconventional move for analytically based modeling, the benchmarking exercise will begin with the plume as the source of contamination. The source and release mechanism are developed and described within the context of performing a preliminary risk assessment utilizing these analytical models. By beginning with the plume as the source term, this paper reviews a typical process and procedure an analyst would follow in developing a CSM for use in a preliminary assessment using this class of analytical tool

  18. Ecological risk assessment

    National Research Council Canada - National Science Library

    Suter, Glenn W; Barnthouse, L. W. (Lawrence W)

    2007-01-01

    Ecological risk assessment is commonly applied to the regulation of chemicals, the remediation of contaminated sites, the monitoring of importation of exotic organisms, the management of watersheds...

  19. Assessing and Managing Knowledge Loss Risk

    International Nuclear Information System (INIS)

    Dermarkar, Fred

    2013-01-01

    Summary: • Sustaining Design Basis Knowledge is a strategic need for long term safe and reliable operation; • Utilities need to manage knowledge in a systematic manner, based on identifying areas of risk, developing and implementing plans to mitigate the risk, and exercising oversight of those plans; • Approaches will differ depending upon organizational functions and needs; • Individual utility efforts are not sufficient: they need to be complemented by a larger scale infrastructure in the academic and research communities; • The Canadian nuclear industry has been collaborating to actively support and expand the academic infrastructure to sustain design basis knowledge; • KM initiatives require constant nurturing for sustainability; • Internationally recognized guidance on Characteristics, Attributes and Best Practices for governmental, industrial and academic contributions to KM is important to sustainability

  20. Nuclear utility self-assessment as viewed by the corporate nuclear safety committee

    International Nuclear Information System (INIS)

    Corcoran, W.R.

    1992-01-01

    This paper discusses how corporate nuclear safety committees use the principles of self-assessment to enhance nuclear power plant safety performance. Corporate nuclear safety committees function to advise the senior nuclear power executive on matters affecting nuclear safety. These committees are required by the administrative controls section of the plant technical specifications which are part of the final safety analysis report and the operating license. Committee membership includes senior utility executives, executives from sister utilities, utility senior technical experts, and outside consultants. Current corporate nuclear safety committees often have a finely tuned intuitive feel for self-assessment that they use to probe the underlying opportunities for quality and safety enhancements. The questions prompted by the self-assessment orientation enable the utility line organization members to gain better perspectives on the characteristics of the organizational systems that they manage and work in

  1. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2001-01-01

    The Nevada Risk Assessment/Management Program is part of a national effort by the U.S. Department of Energy (Grant DE-FG01-96EW56093) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the Nevada Risk Assessment/Management Program and presents a synopsis of the effort that began in 1995 and will officially conclude on April 30, 2000. (author)

  2. Optimising risk reduction: An expected utility approach for marginal risk reduction during regulatory decision making

    International Nuclear Information System (INIS)

    Li Jiawei; Pollard, Simon; Kendall, Graham; Soane, Emma; Davies, Gareth

    2009-01-01

    In practice, risk and uncertainty are essentially unavoidable in many regulation processes. Regulators frequently face a risk-benefit trade-off since zero risk is neither practicable nor affordable. Although it is accepted that cost-benefit analysis is important in many scenarios of risk management, what role it should play in a decision process is still controversial. One criticism of cost-benefit analysis is that decision makers should consider marginal benefits and costs, not present ones, in their decision making. In this paper, we investigate the problem of regulatory decision making under risk by applying expected utility theory and present a new approach of cost-benefit analysis. Directly taking into consideration the reduction of the risks, this approach achieves marginal cost-benefit analysis. By applying this approach, the optimal regulatory decision that maximizes the marginal benefit of risk reduction can be considered. This provides a transparent and reasonable criterion for stakeholders involved in the regulatory activity. An example of evaluating seismic retrofitting alternatives is provided to demonstrate the potential of the proposed approach.

  3. Caries risk assessment in children

    DEFF Research Database (Denmark)

    Twetman, S

    2016-01-01

    PURPOSE: To summarise the findings of recent systematic reviews (SR) covering caries risk assessment in children, updated with recent primary studies. METHODS: A search for relevant papers published 2012-2014 was conducted in electronic databases. The systematic reviews were quality assessed...... displayed a high risk of bias. CONCLUSIONS: Based on the present summary of literature, it may be concluded: (1) a caries risk assessment should be carried out at the child's first dental visit and reassessments should be done during childhood (D); (2) multivariate models display a better accuracy than...... the use of single predictors and this is especially true for preschool children (C); (3) there is no clearly superior method to predict future caries and no evidence to support the use of one model, program, or technology before the other (C); and (4) the risk category should be linked to appropriate...

  4. Eliciting and Combining Decision Criteria Using a Limited Palette of Utility Functions and Uncertainty Distributions: Illustrated by Application to Pest Risk Analysis.

    Science.gov (United States)

    Holt, Johnson; Leach, Adrian W; Schrader, Gritta; Petter, Françoise; MacLeod, Alan; van der Gaag, Dirk Jan; Baker, Richard H A; Mumford, John D

    2014-01-01

    Utility functions in the form of tables or matrices have often been used to combine discretely rated decision-making criteria. Matrix elements are usually specified individually, so no one rule or principle can be easily stated for the utility function as a whole. A series of five matrices are presented that aggregate criteria two at a time using simple rules that express a varying degree of constraint of the lower rating over the higher. A further nine possible matrices were obtained by using a different rule either side of the main axis of the matrix to describe situations where the criteria have a differential influence on the outcome. Uncertainties in the criteria are represented by three alternative frequency distributions from which the assessors select the most appropriate. The output of the utility function is a distribution of rating frequencies that is dependent on the distributions of the input criteria. In pest risk analysis (PRA), seven of these utility functions were required to mimic the logic by which assessors for the European and Mediterranean Plant Protection Organization arrive at an overall rating of pest risk. The framework enables the development of PRAs that are consistent and easy to understand, criticize, compare, and change. When tested in workshops, PRA practitioners thought that the approach accorded with both the logic and the level of resolution that they used in the risk assessments. © 2013 Society for Risk Analysis.

  5. [Regional atmospheric environment risk source identification and assessment].

    Science.gov (United States)

    Zhang, Xiao-Chun; Chen, Wei-Ping; Ma, Chun; Zhan, Shui-Fen; Jiao, Wen-Tao

    2012-12-01

    Identification and assessment for atmospheric environment risk source plays an important role in regional atmospheric risk assessment and regional atmospheric pollution prevention and control. The likelihood exposure and consequence assessment method (LEC method) and the Delphi method were employed to build a fast and effective method for identification and assessment of regional atmospheric environment risk sources. This method was applied to the case study of a large coal transportation port in North China. The assessment results showed that the risk characteristics and the harm degree of regional atmospheric environment risk source were in line with the actual situation. Fast and effective identification and assessment of risk source has laid an important foundation for the regional atmospheric environmental risk assessment and regional atmospheric pollution prevention and control.

  6. OPPT workplan risk assessment for Trichloroethylene ...

    Science.gov (United States)

    The assessment will focus on uses of TCE as a degreaser and in consumer products used by individuals in the arts/crafts field. Given the range of endpoints (cancer, non-cancer; the latter includes potential effects on the developing fetus), it is expected that susceptible populations would be children (as bystanders physically near the actual consumer use of the products) and adults of all ages (including pregnant women). Thus, the assessment will focus on all human/lifestages. EPA anticipates issuing draft risk assessments for public review and comment as they are completed. At the conclusion of the review process, if an assessment of specific uses indicates significant risk, EPA will evaluate and pursue appropriate risk reduction actions, as warranted. If an assessment indicates no significant risk, EPA will conclude its current work on assessment of those specified targeted uses of that chemical. Over time, additional chemicals will be added to the work plan as more data are developed and more chemicals screened.

  7. Fuzzy-probabilistic multi agent system for breast cancer risk assessment and insurance premium assignment.

    Science.gov (United States)

    Tatari, Farzaneh; Akbarzadeh-T, Mohammad-R; Sabahi, Ahmad

    2012-12-01

    In this paper, we present an agent-based system for distributed risk assessment of breast cancer development employing fuzzy and probabilistic computing. The proposed fuzzy multi agent system consists of multiple fuzzy agents that benefit from fuzzy set theory to demonstrate their soft information (linguistic information). Fuzzy risk assessment is quantified by two linguistic variables of high and low. Through fuzzy computations, the multi agent system computes the fuzzy probabilities of breast cancer development based on various risk factors. By such ranking of high risk and low risk fuzzy probabilities, the multi agent system (MAS) decides whether the risk of breast cancer development is high or low. This information is then fed into an insurance premium adjuster in order to provide preventive decision making as well as to make appropriate adjustment of insurance premium and risk. This final step of insurance analysis also provides a numeric measure to demonstrate the utility of the approach. Furthermore, actual data are gathered from two hospitals in Mashhad during 1 year. The results are then compared with a fuzzy distributed approach. Copyright © 2012 Elsevier Inc. All rights reserved.

  8. Assessing Residential Customer Satisfaction for Large Electric Utilities

    OpenAIRE

    Lea Kosnik; L. Douglas Smith; Satish Nayak; Maureen Karig; Mark Konya; Kristy Lovett; Zhennan Liu; Harrison Luvai

    2015-01-01

    Electric utilities, like other service organizations, rely on customer surveys to assess the quality of their services and customer relations. With responses to an in-depth survey of 2,216 residential customers, complementary data from geo-coded public sources, aggregate assessments of performance by J.D. Power & Associates from their independent surveys, historical records of individual customer usage and bill payments, streams of published media content and records of actual service deliver...

  9. Modeling for operational event risk assessment

    International Nuclear Information System (INIS)

    Sattison, M.B.

    1997-01-01

    The U.S. Nuclear Regulatory Commission has been using risk models to evaluate the risk significance of operational events in U.S. commercial nuclear power plants for more seventeen years. During that time, the models have evolved in response to the advances in risk assessment technology and insights gained with experience. Evaluation techniques fall into two categories, initiating event assessments and condition assessments. The models used for these analyses have become uniquely specialized for just this purpose

  10. Risk assessment of forensic patients: nurses' role.

    Science.gov (United States)

    Encinares, Maxima; McMaster, Jeff James; McNamee, Jim

    2005-03-01

    One of the unique roles of forensic nurses is to conduct risk assessments. Establishing a therapeutic nurse-patient relationship helps forensic nurses perform accurate and useful risk assessments. Accurate risk assessments can facilitate formulation of individualized risk management plans, designed to meet patients' needs and ensure public safety. The importance of forensic nurses' knowledge and application of appropriate communication and proper documentation cannot be overemphasized.

  11. Ethical dimensions in assessing technical risks

    International Nuclear Information System (INIS)

    Birnbacher, D.

    1991-01-01

    Contrary to the present tendency of partially impact-independent technology assessment, the author does not see a difference between a risk-benefit analysis and an ethical technology assessment. As long as the risk-benefit analysis is truly comprehensive, both fall together. This does not mean that convictions of those who have their doubts about some new technologies, independently of impact assessments, may be disregarded in purely consequential risk evaluations. On the contrary, qualms of representatives of these principles, just as any other stable non-acceptance, have to be included as aggravating negative elements in technology assessments. (orig./HSCH) [de

  12. Total cardiovascular disease risk assessment: a review.

    LENUS (Irish Health Repository)

    Cooney, Marie Therese

    2011-09-01

    The high risk strategy for the prevention of cardiovascular disease (CVD) requires an assessment of an individual\\'s total CVD risk so that the most intensive risk factor management can be directed towards those at highest risk. Here we review developments in the assessment and estimation of total CVD risk.

  13. Risk assessment of carcinogens in food

    International Nuclear Information System (INIS)

    Barlow, Susan; Schlatter, Josef

    2010-01-01

    Approaches for the risk assessment of carcinogens in food have evolved as scientific knowledge has advanced. Early methods allowed little more than hazard identification and an indication of carcinogenic potency. Evaluation of the modes of action of carcinogens and their broad division into genotoxic and epigenetic (non-genotoxic, non-DNA reactive) carcinogens have played an increasing role in determining the approach followed and provide possibilities for more detailed risk characterisation, including provision of quantitative estimates of risk. Reliance on experimental animal data for the majority of risk assessments and the fact that human exposures to dietary carcinogens are often orders of magnitude below doses used in experimental studies has provided a fertile ground for discussion and diverging views on the most appropriate way to offer risk assessment advice. Approaches used by national and international bodies differ, with some offering numerical estimates of potential risks to human health, while others express considerable reservations about the validity of quantitative approaches requiring extrapolation of dose-response data below the observed range and instead offer qualitative advice. Recognising that qualitative advice alone does not provide risk managers with information on which to prioritise the need for risk management actions, a 'margin of exposure' approach for substances that are both genotoxic and carcinogenic has been developed, which is now being used by the World Health Organization and the European Food Safety Authority. This review describes the evolution of risk assessment advice on carcinogens and discusses examples of ways in which carcinogens in food have been assessed in Europe.

  14. Risk assessment of carcinogens in food.

    Science.gov (United States)

    Barlow, Susan; Schlatter, Josef

    2010-03-01

    Approaches for the risk assessment of carcinogens in food have evolved as scientific knowledge has advanced. Early methods allowed little more than hazard identification and an indication of carcinogenic potency. Evaluation of the modes of action of carcinogens and their broad division into genotoxic and epigenetic (non-genotoxic, non-DNA reactive) carcinogens have played an increasing role in determining the approach followed and provide possibilities for more detailed risk characterisation, including provision of quantitative estimates of risk. Reliance on experimental animal data for the majority of risk assessments and the fact that human exposures to dietary carcinogens are often orders of magnitude below doses used in experimental studies has provided a fertile ground for discussion and diverging views on the most appropriate way to offer risk assessment advice. Approaches used by national and international bodies differ, with some offering numerical estimates of potential risks to human health, while others express considerable reservations about the validity of quantitative approaches requiring extrapolation of dose-response data below the observed range and instead offer qualitative advice. Recognising that qualitative advice alone does not provide risk managers with information on which to prioritise the need for risk management actions, a "margin of exposure" approach for substances that are both genotoxic and carcinogenic has been developed, which is now being used by the World Health Organization and the European Food Safety Authority. This review describes the evolution of risk assessment advice on carcinogens and discusses examples of ways in which carcinogens in food have been assessed in Europe.

  15. The Pink Underside: The Commercialization of Medical Risk Assessment and Decision-Making Tools for Hereditary Breast Cancer Risk.

    Science.gov (United States)

    Hesse-Biber, Sharlene; Flynn, Bailey; Farrelly, Keeva

    2018-04-01

    The growth of the Internet since the millennium has opened up a myriad of opportunities for education, particularly in medicine. Although those looking for health care information used to have to turn to a face-to-face doctor's visit, an immense library of medical advice is now available at their fingertips. The BRCA genetic predispositions (mutations of the BRCA1 and BRCA2 breast cancer genes) which expose men and women to greater risk of breast, ovarian, and other cancers can be researched extensively online. Several nonprofit organizations now offer online risk assessment and decision-making tools meant to supplement conversation with medical professionals, which in actuality are quickly replacing it. We argue here through a critical qualitative template analysis of several such tools that the discursive frameworks utilized are prone to fearmongering, commercialization, and questionable validity. Left unchecked, these assessment tools could do more harm than good in driving young women especially to take unnecessary extreme surgical action.

  16. Clinical utility of Standardised Assessment of Personality - Abbreviated Scale (SAPAS) among patients with first episode depression

    DEFF Research Database (Denmark)

    Bukh, Jens Drachmann; Bock, Camilla; Vinberg, Maj

    2010-01-01

    for comorbid personality disorder among patients suffering from depression would be of clinical use. METHOD: The present study aimed to assess the utility of the Standardised Assessment of Personality - Abbreviated Scale (SAPAS) as a screen for personality disorder in a population of patients recently......BACKGROUND: Personality disorder frequently co-occurs with depression and seems to be associated with a poorer outcome of treatment and increased risk for recurrences. However, the diagnosing of personality disorder can be lengthy and requires some training. Therefore, a brief screening interview...... diagnosed with first episode depression. A total number of 394 patients with an ICD-10 diagnosis of a single depressive episode were sampled consecutively via the Danish Psychiatric Central Research Register during a 2years inclusion period and assessed by the screening interview and, subsequently...

  17. A probabilistic risk assessment for field radiography based on expert judgment and opinion

    International Nuclear Information System (INIS)

    Jang, Han-Ki; Ryu, Hyung-Joon; Kim, Ji-Young; Lee, Jai-Ki; Cho, Kun-Woo

    2011-01-01

    A probabilistic approach was applied to assess radiation risk associated with the field radiography using gamma sources. The Delphi method based on the expert judgments and opinions was used in the process of characterization of parameters affecting risk, which are inevitably subject to large uncertainties. A mathematical approach applying the Bayesian inferences was employed for data processing to improve the Delphi results. This process consists of three phases: (1) setting prior distributions, (2) constructing the likelihood functions and (3) deriving the posterior distributions based on the likelihood functions. The approach for characterizing input parameters using the Bayesian inference is provided for improved risk estimates without intentional rejection of part of the data, which demonstrated utility of Bayesian updating of distributions of uncertain input parameters in PRA (Probabilistic Risk Assessment). The data analysis portion for PRA in field radiography is addressed for estimates of the parameters used to determine the frequencies and consequences of the various events modeled. In this study, radiological risks for the worker and the public member in the vicinity of the work place are estimated for field radiography system in Korea based on two-dimensional Monte Carlo Analysis (2D MCA). (author)

  18. Assessment of net lost revenue adjustment mechanisms for utility DSM programs

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, L.W.

    1995-01-01

    Utility shareholders can lose money on demand-side management (DSM) investments between rate cases. Several industry analysts argue that the revenues lost from utility DSM programs are an important financial disincentive to utility DSM investment. A key utility regulatory reform undertaken since 1989 allows utilities to recover the lost revenues incurred through successful operation of DSM programs. Explicitly defined net lost revenue adjustment (NLRA) mechanisms are states` preferred approach to lost revenue recovery from DSM programs. This report examines the experiences states and utilities are having with the NLRA approach. The report has three objectives. First, we determine whether NLRA is a feasible and successful approach to removing the lost-revenue disincentive to utility operation of DSM programs. Second, we identify the conditions linked to successful implementation of NLRA mechanisms in different states and assess whether NLRA has changed utility investment behavior. Third, we suggest improvements to NLRA mechanisms. We first identify states with NLRA mechanisms where utilities are recovering lost revenues from DSM programs. We interview staff at regulatory agencies in all these states and utility staff in four states. These interviews focus on the status of NLRA, implementation issues, DSM measurement issues, and NLRA results. We also analyze regulatory agency orders on NLRA, as well as associated testimony, reports, and utility lost revenue recovery filings. Finally, we use qualitative and quantitative indicators to assess NLRA`s effectiveness. Contrary to the concerns raised by some industry analysts, our results indicate NLRA is a feasible approach to the lost-revenue disincentive.

  19. Impact of shutdown risk on risk-based assessment of technical specifications

    International Nuclear Information System (INIS)

    Deriot, S.

    1992-10-01

    This paper describes the current work performed by the Research and Development Division of EDF concerning risk-based assessment of Operating Technical Specifications (OTS). The current risk-based assessment of OTS at EDF is presented. Then, the level 1 Probabilistic Safety Assessment of unit 3 of the Paluel nuclear power station (called PSA 1300) is described. It is fully computerized and takes into account the risk in shutdown states. A case study is presented. It shows that the fact of considering shutdown risk suggests that the current OTS should be modified

  20. Risk Assessment Uncertainties in Cybersecurity Investments

    Directory of Open Access Journals (Sweden)

    Andrew Fielder

    2018-06-01

    Full Text Available When undertaking cybersecurity risk assessments, it is important to be able to assign numeric values to metrics to compute the final expected loss that represents the risk that an organization is exposed to due to cyber threats. Even if risk assessment is motivated by real-world observations and data, there is always a high chance of assigning inaccurate values due to different uncertainties involved (e.g., evolving threat landscape, human errors and the natural difficulty of quantifying risk. Existing models empower organizations to compute optimal cybersecurity strategies given their financial constraints, i.e., available cybersecurity budget. Further, a general game-theoretic model with uncertain payoffs (probability-distribution-valued payoffs shows that such uncertainty can be incorporated in the game-theoretic model by allowing payoffs to be random. This paper extends previous work in the field to tackle uncertainties in risk assessment that affect cybersecurity investments. The findings from simulated examples indicate that although uncertainties in cybersecurity risk assessment lead, on average, to different cybersecurity strategies, they do not play a significant role in the final expected loss of the organization when utilising a game-theoretic model and methodology to derive these strategies. The model determines robust defending strategies even when knowledge regarding risk assessment values is not accurate. As a result, it is possible to show that the cybersecurity investments’ tool is capable of providing effective decision support.

  1. Engineering aspects of probabilistic risk assessment

    International Nuclear Information System (INIS)

    vonHerrmann, J.L.; Wood, P.J.

    1984-01-01

    Over the last decade, the use of probabilistic risk assessment (PRA) in the nuclear industry has expanded significantly. In these analyses the probabilities of experiencing certain undesired events (for example, a plant accident which results in damage to the nuclear fuel) are estimated and the consequences of these events are evaluated in terms of some common measure. These probabilities and consequences are then combined to form a representation of the risk associated with the plant studied. In the relatively short history of probabilistic risk assessment of nuclear power plants, the primary motivation for these studies has been the quantitative assessment of public risk associated with a single plant or group of plants. Accordingly, the primary product of most PRAs performed to date has been a 'risk curve' in which the probability (or expected frequency) of exceeding a certain consequence level is plotted against that consequence. The most common goal of these assessments has been to demonstrate the 'acceptability' of the calculated risk by comparison of the resultant risk curve to risk curves associated with other plants or with other societal risks. Presented here are brief descriptions of some alternate applications of PRAs, a discussion of how these other applications compare or contrast with the currently popular uses of PRA, and a discussion of the relative benefits of each

  2. A Model-based Framework for Risk Assessment in Human-Computer Controlled Systems

    Science.gov (United States)

    Hatanaka, Iwao

    2000-01-01

    The rapid growth of computer technology and innovation has played a significant role in the rise of computer automation of human tasks in modem production systems across all industries. Although the rationale for automation has been to eliminate "human error" or to relieve humans from manual repetitive tasks, various computer-related hazards and accidents have emerged as a direct result of increased system complexity attributed to computer automation. The risk assessment techniques utilized for electromechanical systems are not suitable for today's software-intensive systems or complex human-computer controlled systems. This thesis will propose a new systemic model-based framework for analyzing risk in safety-critical systems where both computers and humans are controlling safety-critical functions. A new systems accident model will be developed based upon modem systems theory and human cognitive processes to better characterize system accidents, the role of human operators, and the influence of software in its direct control of significant system functions. Better risk assessments will then be achievable through the application of this new framework to complex human-computer controlled systems.

  3. Assessments and applications to enhance human reliability and reduce risk during less-than-full-power operations

    International Nuclear Information System (INIS)

    Hannaman, G.W.; Singh, A.

    1992-01-01

    Study of events, interviews with plant personnel, and applications of risk studies indicate that the risk of a potential accident during less-than-full-power (LTFP) operation is becoming a greater fraction of the risk as improvements are made to the full-power operations. Industry efforts have been increased to reduce risk and the cost of shutdown operations. These efforts consider the development and application of advanced tools to help utilities proactively identify issues and develop contingencies and interventions to enhance reliability and reduce risk of low-power operations at nuclear power plants. The role for human reliability assessments is to help improve utility outage planning to better achieve schedule and risk control objectives. Improvements are expected to include intervention tools to identify and reduce human error, definition of new instructional modules, and prioritization of risk reduction issues for operators. The Electric Power Research Institute is sponsoring a project to address the identification and quantification of factors that affect human reliability during LTFP operation of nuclear power plants. The results of this project are expected to promote the development of proactively applied interventions and contingencies for enhanced human reliability during shutdown operations

  4. Risk assessment for long-term post-accident sequences

    International Nuclear Information System (INIS)

    Ellia-Hervy, A.; Ducamp, F.

    1987-11-01

    Probabilistic risk analysis, currently conducted by the CEA (French Atomic Energy Commission) for the French replicate series of 900 MWe power plants, has identified accident sequences requiring long-term operation of some systems after the initiating event. They have been named long-term sequences. Quantification of probabilities of such sequences cannot rely exclusively on equipment failure-on-demand data: it must also take into account operating failures, the probability of which increase with time. Specific studies have therefore been conducted for a number of plant systems actuated during these long-term sequences. This has required: - Definition of the most realistic equipment utilization strategies based on existing emergency procedures for 900 MWe French plants. - Evaluation of the potential to repair failed equipment, given accessibility, repair time, and specific radiation conditions for the given sequence. - Definition of the event bringing the long-term sequence to an end. - Establishment of an appropriate quantification method, capable of taking into account the evolution of assumptions concerning equipment utilization strategies or repair conditions over time. The accident sequence quantification method based on realistic scenarios has been used in the risk assessment of the initiating event loss of reactor coolant accident occurring at power and at shutdown. Compared with the results obtained from conventional methods, this method redistributes the relative weight of accident sequences and also demonstrates that the long term can be a significant contribution to the probability of core melt

  5. Insurance World in Transition: Changes in Global Risk Taking and Risk Assessment

    Science.gov (United States)

    Michel, Gero; Tiampo, Kristy

    2015-04-01

    Catastrophe insurance risk assessment, risk taking, and regulation has evolved over the last 20 years and is gearing up for significant further change in the years ahead. Changes in regulation and influx of capital have put profit margins for catastrophe risk products under pressure despite the fact that changes in climate as well as increasing insurance penetration is expected to heighten demand. As a result, reinsurance strategies are moving away from catastrophe risk. In addition, lower margins require cheaper and more efficient risk assessment methods and processes which are contrary to evolving analytical tools and methods that had increased expenses in line with growing margins over the last decade. New capital providers are less familiar with and less willing to accept complex supply chains for risk management, relationship-driven business and tedious data exchange and management processes. Risk takers claim new measures and ask for more flexibility in the use of tools. The current concepts of catastrophe insurance risk assessment are hence under thorough scrutiny. This presentation deals with the changing landscape in catastrophe insurance risk assessment and risk hedging and discusses changes in catastrophe risk assessment products and demand. How likely is it that private, small and nimble hazard and risk consulting groups - increasingly emanating from larger science organizations - will replace large established firms in their role to assess risk? What role do public-private academic partnerships play in assuming risk for catastrophe insurance and what role could they play in the future? What are the opportunities and downsides of the current changes in risk taking and hedging? What is needed from the scientific community in order to fill the gaps in risk management and who is likely to take advantage of the current changes?

  6. Health risk assessment of exposure to ionizing radiation

    International Nuclear Information System (INIS)

    Ogata, Hiromitsu

    2011-01-01

    Risk assessment is an essential process for evaluating the human health effects of exposure to ionizing radiation and for determining acceptable levels of exposure. There are two major components of radiation risk assessment: a measure of exposure level and a measure of disease occurrence. For quantitative estimation of health risks, it is important to evaluate the association between exposure and disease occurrence using epidemiological or experimental data. In these approaches, statistical risk models are used particularly for estimating cancer risks related to exposure to low levels of radiation. This paper presents a summary of basic models and methods of risk assessment for studying exposure-risk relationships. Moreover, quantitative risk estimates are subject to several sources of uncertainty due to inherent limitations in risk assessment studies. This paper also discusses the limitations of radiation risk assessment. (author)

  7. Sovereign default risk assessment

    NARCIS (Netherlands)

    Rijken, H.A.; Altman, E.I.

    2013-01-01

    We propose a new approach toward assessing sovereign risk by examining rigorously the health and aggregate default risk of a nation's private corporate sector. Models can be utilised to measure the probability of default of the non-financial sector cumulatively for five years, both as an absolute

  8. Concave utility, transaction costs, and risk in measuring discounting of delayed rewards.

    Science.gov (United States)

    Kirby, Kris N; Santiesteban, Mariana

    2003-01-01

    Research has consistently found that the decline in the present values of delayed rewards as delay increases is better fit by hyperbolic than by exponential delay-discounting functions. However, concave utility, transaction costs, and risk each could produce hyperbolic-looking data, even when the underlying discounting function is exponential. In Experiments 1 (N = 45) and 2 (N = 103), participants placed bids indicating their present values of real future monetary rewards in computer-based 2nd-price auctions. Both experiments suggest that utility is not sufficiently concave to account for the superior fit of hyperbolic functions. Experiment 2 provided no evidence that the effects of transaction costs and risk are large enough to account for the superior fit of hyperbolic functions.

  9. Safety analysis, risk assessment, and risk acceptance criteria

    International Nuclear Information System (INIS)

    Jamali, K.

    1997-01-01

    This paper discusses a number of topics that relate safety analysis as documented in the Department of Energy (DOE) safety analysis reports (SARs), probabilistic risk assessments (PRA) as characterized primarily in the context of the techniques that have assumed some level of formality in commercial nuclear power plant applications, and risk acceptance criteria as an outgrowth of PRA applications. DOE SARs of interest are those that are prepared for DOE facilities under DOE Order 5480.23 and the implementing guidance in DOE STD-3009-94. It must be noted that the primary area of application for DOE STD-3009 is existing DOE facilities and that certain modifications of the STD-3009 approach are necessary in SARs for new facilities. Moreover, it is the hazard analysis (HA) and accident analysis (AA) portions of these SARs that are relevant to the present discussions. Although PRAs can be qualitative in nature, PRA as used in this paper refers more generally to all quantitative risk assessments and their underlying methods. HA as used in this paper refers more generally to all qualitative risk assessments and their underlying methods that have been in use in hazardous facilities other than nuclear power plants. This discussion includes both quantitative and qualitative risk assessment methods. PRA has been used, improved, developed, and refined since the Reactor Safety Study (WASH-1400) was published in 1975 by the Nuclear Regulatory Commission (NRC). Much debate has ensued since WASH-1400 on exactly what the role of PRA should be in plant design, reactor licensing, 'ensuring' plant and process safety, and a large number of other decisions that must be made for potentially hazardous activities. Of particular interest in this area is whether the risks quantified using PRA should be compared with numerical risk acceptance criteria (RACs) to determine whether a facility is 'safe.' Use of RACs requires quantitative estimates of consequence frequency and magnitude

  10. PRECIS -- A probabilistic risk assessment system

    International Nuclear Information System (INIS)

    Peterson, D.M.; Knowlton, R.G. Jr.

    1996-01-01

    A series of computer tools has been developed to conduct the exposure assessment and risk characterization phases of human health risk assessments within a probabilistic framework. The tools are collectively referred to as the Probabilistic Risk Evaluation and Characterization Investigation System (PRECIS). With this system, a risk assessor can calculate the doses and risks associated with multiple environmental and exposure pathways, for both chemicals and radioactive contaminants. Exposure assessment models in the system account for transport of contaminants to receptor points from a source zone originating in unsaturated soils above the water table. In addition to performing calculations of dose and risk based on initial concentrations, PRECIS can also be used in an inverse manner to compute soil concentrations in the source area that must not be exceeded if prescribed limits on dose or risk are to be met. Such soil contaminant levels, referred to as soil guidelines, are computed for both single contaminants and chemical mixtures and can be used as action levels or cleanup levels. Probabilistic estimates of risk, dose and soil guidelines are derived using Monte Carlo techniques

  11. Risk assessment of soil contamination criteria

    International Nuclear Information System (INIS)

    King, C.M.; Marter, W.L.; Montaque, D.F.; Holton, G.A.

    1987-06-01

    Criteria have been developed to select radioactive and nonradioactive contaminants at waste sites detailed analysis and risk assessment. These criteria were based on soil and water quality guidelines developed by various government agencies to determine if the criteria were appropriate. We performed a risk assessment of a hypothetical site which contained radioactive and nonradioactive contaminants at levels equal to the criteria values. Risks to the public from atmospheric, surface water, and groundwater exposure pathways were examined. Health risks to the public from atmospheric releases of radioactive and nonradioactive materials from a waste at soil criteria contamination levels are low. Health risks to the maximally exposed individual to chemical carcinogens are considerably below traditional EPA action levels. And health risks to the maximally exposed individual to atmospherically released radioactive contaminants is 1.88 x 10 -7 , more than a factor of 5 less than 10 -6 . Based on our atmospheric exposure pathways analysis and risk assessment, the applied soil criteria are appropriate for screening out unimportant risk contributors to human health from atmospheric exposure pathways. 13 refs., 3 figs., 7 tabs

  12. Design and implementation of an online risk monitor

    International Nuclear Information System (INIS)

    Majdara, A.; Nematollah, M. R.; Haddad, K.; Sepanloo, K.

    2006-01-01

    Probabilistic Safety Assessment is a powerful method for evaluating the safety of nuclear facilities. Probabilistic Safety Assessment models are the basis of online risk monitors, which can be utilized for monitoring the online risk. In this paper a newly developed risk monitor called Safety Assessment Tool is presented, and its main features and capabilities are introduced. Some of these features are: graphical event/fault tree developing interface, a 30-day risk profile, performing importance analysis, different administrative levels, and handling time dependent failure data. Safety Assessment Tool can be utilized in nuclear power plants, research reactors, etc. as an online assistant to manage safety issues and prevent high-risk configurations

  13. Risk assessment for transport operations

    International Nuclear Information System (INIS)

    Appleton, P.R.; Miles, J.C.

    1990-01-01

    The world-wide safety of the transport of radioactive material is based on the IAEA Transport Regulations. Risk assessment can provide quantitative data to help in the demonstration, understanding and improvement of the effectiveness of the Regulations in assuring safety. In this Paper the methodology, data and computer codes necessary and available for transport risk assessment are reviewed. Notable examples of assessments carried out over the past 15 years are briefly described along with current research, and the benefits and limitations of the techniques are discussed. (author)

  14. Assessing Extinction Risk: Integrating Genetic Information

    Directory of Open Access Journals (Sweden)

    Jason Dunham

    1999-06-01

    Full Text Available Risks of population extinction have been estimated using a variety of methods incorporating information from different spatial and temporal scales. We briefly consider how several broad classes of extinction risk assessments, including population viability analysis, incidence functions, and ranking methods integrate information on different temporal and spatial scales. In many circumstances, data from surveys of neutral genetic variability within, and among, populations can provide information useful for assessing extinction risk. Patterns of genetic variability resulting from past and present ecological and demographic events, can indicate risks of extinction that are otherwise difficult to infer from ecological and demographic analyses alone. We provide examples of how patterns of neutral genetic variability, both within, and among populations, can be used to corroborate and complement extinction risk assessments.

  15. Safety assessment of envisaged systems for automotive hydrogen supply and utilization

    Energy Technology Data Exchange (ETDEWEB)

    Landucci, Gabriele [Dipartimento di Ingegneria Chimica, Chimica Industriale e Scienza dei Materiali, Universita di Pisa, via Diotisalvi n.2, 56126 Pisa (Italy); Tugnoli, Alessandro; Cozzani, Valerio [Dipartimento di Ingegneria Chimica, Mineraria e delle Tecnologie Ambientali, Alma Mater Studiorum - Universita di Bologna, via Terracini n.28, 40131 Bologna (Italy)

    2010-02-15

    A novel consequence-based approach was applied to the inherent safety assessment of the envisaged hydrogen production, distribution and utilization systems, in the perspective of the widespread hydrogen utilization as a vehicle fuel. Alternative scenarios were assessed for the hydrogen system chain from large scale production to final utilization. Hydrogen transportation and delivery was included in the analysis. The inherent safety fingerprint of each system was quantified by a set of Key Performance Indicators (KPIs). Rules for KPIs aggregation were considered for the overall assessment of the system chains. The final utilization stage resulted by large the more important for the overall expected safety performance of the system. Thus, comparison was carried out with technologies proposed for the use of other low emission fuels, as LPG and natural gas. The hazards of compressed hydrogen-fueled vehicles resulted comparable, while reference innovative hydrogen technologies evidenced a potentially higher safety performance. Thus, switching to the inherently safer technologies currently under development may play an important role in the safety enhancement of hydrogen vehicles, resulting in a relevant improvement of the overall safety performance of the entire hydrogen system. (author)

  16. Risk assessment of metal vapor arcing

    Science.gov (United States)

    Hill, Monika C. (Inventor); Leidecker, Henning W. (Inventor)

    2009-01-01

    A method for assessing metal vapor arcing risk for a component is provided. The method comprises acquiring a current variable value associated with an operation of the component; comparing the current variable value with a threshold value for the variable; evaluating compared variable data to determine the metal vapor arcing risk in the component; and generating a risk assessment status for the component.

  17. Assessing reservoir operations risk under climate change

    Science.gov (United States)

    Brekke, L.D.; Maurer, E.P.; Anderson, J.D.; Dettinger, M.D.; Townsley, E.S.; Harrison, A.; Pruitt, T.

    2009-01-01

    Risk-based planning offers a robust way to identify strategies that permit adaptive water resources management under climate change. This paper presents a flexible methodology for conducting climate change risk assessments involving reservoir operations. Decision makers can apply this methodology to their systems by selecting future periods and risk metrics relevant to their planning questions and by collectively evaluating system impacts relative to an ensemble of climate projection scenarios (weighted or not). This paper shows multiple applications of this methodology in a case study involving California's Central Valley Project and State Water Project systems. Multiple applications were conducted to show how choices made in conducting the risk assessment, choices known as analytical design decisions, can affect assessed risk. Specifically, risk was reanalyzed for every choice combination of two design decisions: (1) whether to assume climate change will influence flood-control constraints on water supply operations (and how), and (2) whether to weight climate change scenarios (and how). Results show that assessed risk would motivate different planning pathways depending on decision-maker attitudes toward risk (e.g., risk neutral versus risk averse). Results also show that assessed risk at a given risk attitude is sensitive to the analytical design choices listed above, with the choice of whether to adjust flood-control rules under climate change having considerably more influence than the choice on whether to weight climate scenarios. Copyright 2009 by the American Geophysical Union.

  18. Cavity degradation risk insurance assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hampson, C.; Neill, P.; de Bivort, L.

    1980-01-01

    This study examined the risks and risk management issues involved with the implementation by electric power utilities of compressed air energy storage and underground pumped hydro storage systems. The results are listed in terms of relative risks for the construction and operation of these systems in different geologic deposits, with varying amounts of pressurization, with natural or man-made disasters in the vicinity of the storage equipment, and with different modes of operating the facilities. (LCL)

  19. Risk assessment research and technology assessment

    International Nuclear Information System (INIS)

    Albach, H.; Schade, D.; Sinn, H.

    1991-01-01

    The concepts and approaches for technology assessment, the targets and scientific principles, as well as recognizable deficits and recommendations concerning purposeful strategies for the promotion of this research field require a dialog between those concerned. Conception, deficits, and the necessary measures for risk assessment research and technology assessment were discussed as well as ethical aspects. The problematic nature of using organisms altered through genetic engineering in the open land, traffic and transport, site restoration, nuclear energy, and isotope applications were subjects particularly dealt with. (DG) [de

  20. Multisensor satellite data for water quality analysis and water pollution risk assessment: decision making under deep uncertainty with fuzzy algorithm in framework of multimodel approach

    Science.gov (United States)

    Kostyuchenko, Yuriy V.; Sztoyka, Yulia; Kopachevsky, Ivan; Artemenko, Igor; Yuschenko, Maxim

    2017-10-01

    Multi-model approach for remote sensing data processing and interpretation is described. The problem of satellite data utilization in multi-modeling approach for socio-ecological risks assessment is formally defined. Observation, measurement and modeling data utilization method in the framework of multi-model approach is described. Methodology and models of risk assessment in framework of decision support approach are defined and described. Method of water quality assessment using satellite observation data is described. Method is based on analysis of spectral reflectance of aquifers. Spectral signatures of freshwater bodies and offshores are analyzed. Correlations between spectral reflectance, pollutions and selected water quality parameters are analyzed and quantified. Data of MODIS, MISR, AIRS and Landsat sensors received in 2002-2014 have been utilized verified by in-field spectrometry and lab measurements. Fuzzy logic based approach for decision support in field of water quality degradation risk is discussed. Decision on water quality category is making based on fuzzy algorithm using limited set of uncertain parameters. Data from satellite observations, field measurements and modeling is utilizing in the framework of the approach proposed. It is shown that this algorithm allows estimate water quality degradation rate and pollution risks. Problems of construction of spatial and temporal distribution of calculated parameters, as well as a problem of data regularization are discussed. Using proposed approach, maps of surface water pollution risk from point and diffuse sources are calculated and discussed.

  1. Assessment of Interpersonal Risk (AIR) in Adults with Learning Disabilities and Challenging Behaviour--Piloting a New Risk Assessment Tool

    Science.gov (United States)

    Campbell, Martin; McCue, Michael

    2013-01-01

    A new risk assessment tool, "Assessment of Interpersonal Risk" (AIR), was piloted and evaluated to measure risk factors and compatibility between individuals living in an assessment and treatment unit in one NHS area. The adults with learning disabilities in this unit had severe and enduring mental health problems and/or behaviour that is severely…

  2. Utility of Respondent Driven Sampling to Reach Disadvantaged Emerging Adults for Assessment of Substance Use, Weight, and Sexual Behaviors.

    Science.gov (United States)

    Tucker, Jalie A; Simpson, Cathy A; Chandler, Susan D; Borch, Casey A; Davies, Susan L; Kerbawy, Shatomi J; Lewis, Terri H; Crawford, M Scott; Cheong, JeeWon; Michael, Max

    2016-01-01

    Emerging adulthood often entails heightened risk-taking with potential life-long consequences, and research on risk behaviors is needed to guide prevention programming, particularly in under-served and difficult to reach populations. This study evaluated the utility of Respondent Driven Sampling (RDS), a peer-driven methodology that corrects limitations of snowball sampling, to reach at-risk African American emerging adults from disadvantaged urban communities. Initial "seed" participants from the target group recruited peers, who then recruited their peers in an iterative process (110 males, 234 females; M age = 18.86 years). Structured field interviews assessed common health risk factors, including substance use, overweight/obesity, and sexual behaviors. Established gender-and age-related associations with risk factors were replicated, and sample risk profiles and prevalence estimates compared favorably with matched samples from representative U.S. national surveys. Findings supported the use of RDS as a sampling method and grassroots platform for research and prevention with community-dwelling risk groups.

  3. Chemical Risk Assessment: Traditional vs Public Health ...

    Science.gov (United States)

    Preventing adverse health impacts from exposures to environmental chemicals is fundamental to protecting individual and public health. When done efficiently and properly, chemical risk assessment enables risk management actions that minimize the incidence and impacts of environmentally-induced diseases related to chemical exposure. However, traditional chemical risk assessment is faced with multiple challenges with respect to predicting and preventing disease in human populations, and epidemiological studies increasingly report observations of adverse health effects at exposure levels predicted from animal studies to be safe for humans. This discordance reinforces concerns about the adequacy of contemporary risk assessment practices (Birnbaum, Burke, & Jones, 2016) for protecting public health. It is becoming clear that to protect public health more effectively, future risk assessments will need to use the full range of available data, draw on innovative methods to integrate diverse data streams, and consider health endpoints that also reflect the range of subtle effects and morbidities observed in human populations. Given these factors, there is a need to reframe chemical risk assessment to be more clearly aligned with the public health goal of minimizing environmental exposures associated with disease. Preventing adverse health impacts from exposures to environmental chemicals is fundamental to protecting individual and public health. Chemical risk assessments

  4. Risk-assessment methodology for fast breeder reactors

    International Nuclear Information System (INIS)

    Ott, K.O.

    1976-04-01

    The methods applied or proposed for risk assessment of nuclear reactors are reviewed, particularly with respect to their applicability for risk assessment of future commercial fast breeder reactors. All methods are based on the calculation of accident consequences for relatively few accident scenarios. The role and general impact of uncertainties in fast-reactor accident analysis are discussed. The discussion shows the need for improvement of the methodology. A generalized and improved risk-assessment methodology is outlined and proposed (accident-spectra-progression approach). The generalization consists primarily of an explicit treatment of uncertainties throughout the accident progression. The results of this method are obtained in form of consequence distributions. The width and shape of the distributions depend in part on the superposition of the uncertainties. The first moment of the consequence distribution gives an improved prediction of the ''average'' consequence. The higher-consequence moments can be used for consideration of risk aversion. The assessment of the risk of one or a certain number of nuclear reactors can only provide an ''isolated'' risk assessment. The general problem of safety risk assessment and its relation to public acceptance of certain modes of power production is a much broader problem area, which is also discussed

  5. Quantitative Microbial Risk Assessment for in Natural and Processed Cheeses

    Directory of Open Access Journals (Sweden)

    Heeyoung Lee

    2016-08-01

    Full Text Available This study evaluated the risk of Clostridium perfringens (C. perfringens foodborne illness from natural and processed cheeses. Microbial risk assessment in this study was conducted according to four steps: hazard identification, hazard characterization, exposure assessment, and risk characterization. The hazard identification of C. perfringens on cheese was identified through literature, and dose response models were utilized for hazard characterization of the pathogen. For exposure assessment, the prevalence of C. perfringens, storage temperatures, storage time, and annual amounts of cheese consumption were surveyed. Eventually, a simulation model was developed using the collected data and the simulation result was used to estimate the probability of C. perfringens foodborne illness by cheese consumption with @RISK. C. perfringens was determined to be low risk on cheese based on hazard identification, and the exponential model (r = 1.82×10−11 was deemed appropriate for hazard characterization. Annual amounts of natural and processed cheese consumption were 12.40±19.43 g and 19.46±14.39 g, respectively. Since the contamination levels of C. perfringens on natural (0.30 Log CFU/g and processed cheeses (0.45 Log CFU/g were below the detection limit, the initial contamination levels of natural and processed cheeses were estimated by beta distribution (α1 = 1, α2 = 91; α1 = 1, α2 = 309×uniform distribution (a = 0, b = 2; a = 0, b = 2.8 to be −2.35 and −2.73 Log CFU/g, respectively. Moreover, no growth of C. perfringens was observed for exposure assessment to simulated conditions of distribution and storage. These data were used for risk characterization by a simulation model, and the mean values of the probability of C. perfringens foodborne illness by cheese consumption per person per day for natural and processed cheeses were 9.57×10−14 and 3.58×10−14, respectively. These results indicate that probability of C. perfringens

  6. The evolution of violence risk assessment.

    Science.gov (United States)

    Monahan, John; Skeem, Jennifer L

    2014-10-01

    Many instruments have been published in recent years to improve the ability of mental health clinicians to estimate the likelihood that an individual will behave violently toward others. Increasingly, these instruments are being applied in response to laws that require specialized risk assessments. In this review, we present a framework that goes beyond the "clinical" and "actuarial" dichotomy to describe a continuum of structured approaches to risk assessment. Despite differences among them, there is little evidence that one instrument predicts violence better than another. We believe that these group-based instruments are useful for assessing an individual's risk, and that the instrument should be chosen based on the purpose of the assessment.

  7. Environmental Comparative Risk Assessment: A Case Study

    International Nuclear Information System (INIS)

    Ali, M.M.

    2007-01-01

    Health and environmental impacts associated with energy production and industrial activities as well as food production and agricultural activities have had great concern in the last decades. Early activities emerged in late 80s of the last century through an Inter- Agency project (lAEA, UNDY, WHO, ... ) on the comparative risk assessment from energy systems and industrial complexes. A work-shop on Risk Assessment and Management in large industrial areas was held in Alexandria Egypt on 20-33 Det 1993, sponsored by IAEA. Several conferences, experts work groups and workshops were held there of Recent trends in determining risks are: 1. Use of probabilistic risk assessment approach to identify hazardous activities and accident scenario. 2. development of data base on failure probabilities and appropriate physical models. 3. Development of related directives and regulations and criteria Comparative risk assessment case study as a tool for comparing risk is emphasized Criteria of exposure to human and ecological risks are addressed

  8. Flood risk assessment and mapping for the Lebanese watersheds

    Science.gov (United States)

    Abdallah, Chadi; Hdeib, Rouya

    2016-04-01

    Of all natural disasters, floods affect the greatest number of people worldwide and have the greatest potential to cause damage. Nowadays, with the emerging global warming phenomenon, this number is expected to increase. The Eastern Mediterranean area, including Lebanon (10452 Km2, 4.5 M habitant), has witnessed in the past few decades an increase frequency of flooding events. This study profoundly assess the flood risk over Lebanon covering all the 17 major watersheds and a number of small sub-catchments. It evaluate the physical direct tangible damages caused by floods. The risk assessment and evaluation process was carried out over three stages; i) Evaluating Assets at Risk, where the areas and assets vulnerable to flooding are identified, ii) Vulnerability Assessment, where the causes of vulnerability are assessed and the value of the assets are provided, iii) Risk Assessment, where damage functions are established and the consequent damages of flooding are estimated. A detailed Land CoverUse map was prepared at a scale of 1/ 1 000 using 0.4 m resolution satellite images within the flood hazard zones. The detailed field verification enabled to allocate and characterize all elements at risk, identify hotspots, interview local witnesses, and to correlate and calibrate previous flood damages with the utilized models. All filed gathered information was collected through Mobile Application and transformed to be standardized and classified under GIS environment. Consequently; the general damage evaluation and risk maps at different flood recurrence periods (10, 50, 100 years) were established. Major results showed that floods in a winter season (December, January, and February) of 10 year recurrence and of water retention ranging from 1 to 3 days can cause total damages (losses) that reach 1.14 M for crop lands and 2.30 M for green houses. Whereas, it may cause 0.2 M to losses in fruit trees for a flood retention ranging from 3 to 5 days. These numbers differs

  9. Calcium scores in the risk assessment of an asymptomatic population: implications for airline pilots.

    Science.gov (United States)

    Wirawan, I Made Ady; Wu, Rodney; Abernethy, Malcolm; Aldington, Sarah; Larsen, Peter D

    2014-08-01

    This study evaluated whether coronary artery calcium score (CACS) improved cardiovascular disease risk prediction when compared to the New Zealand Cardiovascular Risk Charts (NZ-CRC), and describes the potential utilization of CACS in cardiovascular disease (CVD) risk assessment of pilots. A cross-sectional study was performed among asymptomatic patients who underwent coronary computed tomography angiography at Pacific Radiology Wellington, New Zealand, between August 2007 and July 2012 and had their CACS and CVD risk score calculated. Receiver-operating characteristics (ROC) analyses were used to measure the accuracy of the NZ-CRC and CACS. Reclassification analyses were performed to examine the net reclassification improvement (NRI) of CACS when compared to NZ-CRC. Over a 5-yr study period, 237 male asymptomatic patients with ages ranging from 30 to 69 yr with a mean (SD) of 53.24 (8.18) yr, were included. The area under the ROC curves (AUC) (95% CI) for CACS and NZ-CRC were 0.88 (0.83-0.93) and 0.66 (0.59-0.73), respectively. The NRI (95% CI) of the calcium scores was 0.39 (0.17-0.62). CACS should be assessed in pilots with 5-yr CVD risk scores of 5-10% and 10-15%. CACS has a better accuracy than the NZ-CRC and reclassified a considerable proportion of asymptomatic patients into correct cardiovascular risk categories. An approach on how the CACS should be employed in the cardiovascular risk assessment of airline pilots is noted in this paper.

  10. Utilization of prostate brachytherapy for low risk prostate cancer: Is the decline overstated?

    Science.gov (United States)

    Safdieh, Joseph; Wong, Andrew; Weiner, Joseph P; Schwartz, David; Schreiber, David

    2016-08-01

    Several prior studies have suggested that brachytherapy utilization has markedly decreased, coinciding with the recent increased utilization of intensity modulated radiation therapy, as well as an increase in urologist-owned centers. We sought to investigate the brachytherapy utilization in a large, hospital-based registry. Men with prostate cancer diagnosed between 2004-2012 and treated with either external beam radiation and/or prostate brachytherapy were abstracted from the National Cancer Database. In order to be included, men had to be clinically staged as T1c-T2aNx-0Mx-0, Gleason 6, PSA ≤ 10.0 ng/ml. Descriptive statistics were used to analyze brachytherapy utilization over time and were compared via χ(2). Multivariate logistic regression was used to assess for covariables associated with increased brachytherapy usage. There were 89,413 men included in this study, of which 37,054 (41.6%) received only external beam radiation, and 52,089 (58.4%) received prostate brachytherapy. The use of brachytherapy declined over time from 62.9% in 2004 to 51.3% in 2012 (p facilities (60.8% in 2004 to 47.0% in 2012, p facilities (63.7% in 2004 to 53.0% in 2012, p facilities than those who lived further. The use of intensity modulated radiation therapy increased during this same time period from 18.4% in 2004 to 38.2% in 2012 (p usage. In this hospital-based registry, prostate brachytherapy usage has declined for low risk prostate cancer as intensity modulated radiation therapy usage has increased. However, it still remains the treatment of choice for 51.3% of patients as of 2012.

  11. Coping with nuclear power risks: the electric utility incentives

    International Nuclear Information System (INIS)

    Starr, C.; Whipple, C.

    1982-01-01

    The financial risks associated with nuclear power accidents are estimated by interpolating between frequency-vs.-severity data from routine outages and the frequency-vs.-severity estimates from the Nuclear Regulatory Commission's (NRC's) Reactor Safety Study (WASH-1400). This analysis indicates that the expected costs of plant damage and lost power production are large compared to the public risks estimated in WASH-1400, using values from An Approach to Quantitative Safety Goals for Nuclear Power Plants (NUREG-0739), prepared by the NRC Advisory Committee on Reactor Safeguards. Analyses of the cost-effectiveness of accident-prevention investments that include only anticipated public safety benefits will underestimate the value of such investments if reductions in power plant damage risk are not included. The analysis also suggests that utility self-interest and the public interest in safety are generally coincident. It is argued that greater use could be made of this self-interest in regulation if the relationship between the NRC and the industry were more cooperative, less adversary in nature

  12. Risk assessment approach for Rokkasho reprocessing plant

    International Nuclear Information System (INIS)

    Ootou, Y.; Tamauchi, Y.; Hayashi, Y.; Takebe, K.; Miyata, T.

    2006-01-01

    Full text: It is desirable that the operation and maintenance of Rokkasho Reprocessing Plant (RRP) be established and conducted with maximum effectiveness and efficiency, making the best use of risk information to help the plant achieve further enhanced safety. Risk assessment is applied for RRP, and upgraded risk information is established. In the basic design phase, the potential incidents and accidents that might occur in the plant were identified systematically and exhaustively adopting the HAZOP method. After screening the potential for occurrence, the design basis accidents (DBAs) were identified and it was confirmed that the plant would not put the general public at risk of significant radiation exposure in the case of such accidents, even when assuming the single failure of dynamic apparatus in the prevention and mitigation systems. To support the deterministic safety assessment mentioned above, the risk assessment was conducted during the basic design phase. Of the DBAs and out-of-design basis accidents excluded from DBAs because of extremely rare occurrence possibilities, the risk assessment was conducted for such accidents which might cause relatively high consequence for the general public. The risk assessment was conducted using the PSA method generally used for nuclear power plants. After that, a review of the occurrence frequency assessment for some of the accidents was made, taking into account information relating to detailed design and operation procedures. Typical examples are a loss of the hydrogen scavenging function in the plutonium solution tank and a loss of cooling capability in the high-active liquid waste storage tank. The occurrence frequency for a loss of the hydrogen scavenging function was less than 10 -5 /year. The occurrence frequency for a loss of cooling capability was less than 10 -7 /year. In addition, an importance assessment (FV index, Risk Achievement Worth) was conducted, such as a contribution to the occurrence frequency

  13. The Risk Assessment at the Workplace of Assembly Operation

    Directory of Open Access Journals (Sweden)

    Marek Burda

    2014-01-01

    Full Text Available Risk Assessment Process by FMEA method involve hazard identification, risk assessment and risk control processes and their input is fundamental to a successful EH&S system. This Risk assessment tool follows the general process and requirements of the Health and Safety Risk Assessment Procedure.

  14. Probabilistic risk assessment and its role in plant modifications

    International Nuclear Information System (INIS)

    Diederich, A.R.; McElroy, W.F.

    1986-01-01

    Electric Utilities today have a tool available to improve management's ability to evaluate nuclear power plant modifications (MODS). Probabilistic Risk Assessment (PRA), is a tool of choice since it can be applied to a specific situation such as MOD request review, bringing the perspectives of reliability, financial risk and consequences to the public in addition to the more rigid requirements like those associated with Quality Assurance or licensing criteria. The techniques used in the PRA process revolve about the creation and manipulation of Fault Trees and Event Trees, which are used to quantify the event sequences and reliability of plant systems in a logical framework. It is through these methods that chains of sequences, or events, are understood. The degree to which plant systems are modelled in the PRA can vary depending on resources and purpose. Philadelphia Elecrtric Company's PRA modelled ten (10) major systems but this number may increase during the application and updating process

  15. Assessment of Transportation Risk of Radioactive Materials in Uganda

    International Nuclear Information System (INIS)

    Richard, Menya; Kim, Jonghyun

    2014-01-01

    Radioactive materials refer to any materials that spontaneously emit ionizing radiation and of which the radioactivity per gram is greater than 0.002 micro-curie. They include: spent nuclear fuel, nuclear wastes, medical sources i.e. Co-60, industrial sources i.e. Cs-137, Am-241:Be, Ra-226, and sources for research. In view of the rising reported cancer cases in Uganda, which might be as a result of radiation exposure due to constant transportation of radioactive materials i.e. industrial sources, a risk analysis was thought of and undertaken for the country's safety evaluation and improvement. It was therefore important to undertake a risk assessment of the actual and potential radiation exposure during the transportation process. This paper explains a study undertaken for transport risk assessment of the impact on the environment and the people living in it, from exposure to radioactivity during transportation of the industrial sources in Uganda. It provides estimates of radiological risks associated with visualized transport scenarios for the highway transport mode. This is done by calculating the human health impact and radiological risk from transportation of the sources along Busia transport route to Hoima. Busia is the entry port for the sources whilst Hoima, where various industrial practices that utilize sources like oil explorations are centered. During the study, a computer code RADTRAN-6 was used. The overall collective dose for population and package transport crew are 3.72E-4 and 1.69E-4 person-sievert respectively. These are less than the exemption value recommended by the IAEA and Uganda Regulatory Authority for public implying that no health effects like cancer are to be expected. Hence the rising cancer cases in the country are not as a result of increased transportation of radioactive materials in the Industrial sector

  16. Assessment of Transportation Risk of Radioactive Materials in Uganda

    Energy Technology Data Exchange (ETDEWEB)

    Richard, Menya; Kim, Jonghyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    Radioactive materials refer to any materials that spontaneously emit ionizing radiation and of which the radioactivity per gram is greater than 0.002 micro-curie. They include: spent nuclear fuel, nuclear wastes, medical sources i.e. Co-60, industrial sources i.e. Cs-137, Am-241:Be, Ra-226, and sources for research. In view of the rising reported cancer cases in Uganda, which might be as a result of radiation exposure due to constant transportation of radioactive materials i.e. industrial sources, a risk analysis was thought of and undertaken for the country's safety evaluation and improvement. It was therefore important to undertake a risk assessment of the actual and potential radiation exposure during the transportation process. This paper explains a study undertaken for transport risk assessment of the impact on the environment and the people living in it, from exposure to radioactivity during transportation of the industrial sources in Uganda. It provides estimates of radiological risks associated with visualized transport scenarios for the highway transport mode. This is done by calculating the human health impact and radiological risk from transportation of the sources along Busia transport route to Hoima. Busia is the entry port for the sources whilst Hoima, where various industrial practices that utilize sources like oil explorations are centered. During the study, a computer code RADTRAN-6 was used. The overall collective dose for population and package transport crew are 3.72E-4 and 1.69E-4 person-sievert respectively. These are less than the exemption value recommended by the IAEA and Uganda Regulatory Authority for public implying that no health effects like cancer are to be expected. Hence the rising cancer cases in the country are not as a result of increased transportation of radioactive materials in the Industrial sector.

  17. Assessing Field-Specific Risk of Soybean Sudden Death Syndrome Using Satellite Imagery in Iowa.

    Science.gov (United States)

    Yang, S; Li, X; Chen, C; Kyveryga, P; Yang, X B

    2016-08-01

    Moderate resolution imaging spectroradiometer (MODIS) satellite imagery from 2004 to 2013 were used to assess the field-specific risks of soybean sudden death syndrome (SDS) caused by Fusarium virguliforme in Iowa. Fields with a high frequency of significant decrease (>10%) of the normalized difference vegetation index (NDVI) observed in late July to middle August on historical imagery were hypothetically considered as high SDS risk. These high-risk fields had higher slopes and shorter distances to flowlines, e.g., creeks and drainages, particularly in the Des Moines lobe. Field data in 2014 showed a significantly higher SDS level in the high-risk fields than fields selected without considering NDVI information. On average, low-risk fields had 10 times lower F. virguliforme soil density, determined by quantitative polymerase chain reaction, compared with other surveyed fields. Ordinal logistic regression identified positive correlations between SDS and slope, June NDVI, and May maximum temperature, but high June maximum temperature hindered SDS. A modeled SDS risk map showed a clear trend of potential disease occurrences across Iowa. Landsat imagery was analyzed similarly, to discuss the ability to utilize higher spatial resolution data. The results demonstrated the great potential of both MODIS and Landsat imagery for SDS field-specific risk assessment.

  18. Research into specific risk assessment in project financing

    Directory of Open Access Journals (Sweden)

    Ivana Bestvina Bukvić

    2013-12-01

    Full Text Available An assessment of investment justification in terms of risk enables the decision maker (investor to select, among available alternatives, the one with the most favourable correlation between the expected profit and assumed risk. At the micro level, the uncertainty of business success is extremely high in production activities, which is an additional incentive for taking a comprehensive approach to the issue of investment decision-making and the development of risk assessment techniques applicable in this particular segment of industry. Given the complexity of the manufacturing process, the length of the production cycle, market conditions, and entity-specific risks (which are difficult to measure, projects in manufacturing industry require a detailed and comprehensive assessment of specific risk factors and their cost-effectiveness. Ne - vertheless, since specific risks can be diversified, investment proposal assessments in practice usually do not cover their quantification and analysis. However, the majority of business entities do not have enough active projects in various industries to be able to fully diversify their business and thus minimize the level of specific risks. The impact of specific factors becomes one of the most important elements for business success. This paper analyses how far risk assessment methods regarding specific risks are used in practice. Furthermore, it analyses the significance of specific risks for total investment risk. This study gives new insi - ghts into the significance of specific risks to the overall investment assessment and the need for permanent development of traditionally used investment assessment models.

  19. Risk assessment of complex accident scenarios

    International Nuclear Information System (INIS)

    Kluegel, Jens-Uwe

    2012-01-01

    The use of methods of risk assessment in accidents in nuclear plants is based on an old tradition. The first consistent systematic study is considered to be the Rasmussen Study of the U.S. Nuclear Regulatory Commission, NRC, WASH-1400. Above and beyond the realm of nuclear technology, there is an extensive range of accident, risk and reliability research into technical-administrative systems. In the past, it has been this area of research which has led to the development of concepts of safety precautions of the type also introduced into nuclear technology (barrier concept, defense in depth, single-failure criterion), where they are now taken for granted as trivial concepts. Also for risk analysis, nuclear technology made use of methods (such as event and fault tree analyses) whose origins were outside the nuclear field. One area in which the use of traditional methods of probabilistic safety analysis is encountering practical problems is risk assessment of complex accident scenarios in nuclear technology. A definition is offered of the term 'complex accident scenarios' in nuclear technology. A number of problems are addressed which arise in the use of traditional PSA procedures in risk assessment of complex accident scenarios. Cases of complex accident scenarios are presented to demonstrate methods of risk assessment which allow robust results to be obtained even when traditional techniques of risk analysis are maintained as a matter of principle. These methods are based on the use of conditional risk metrics. (orig.)

  20. Aquatic Macrophyte Risk Assessment for Pesticides

    NARCIS (Netherlands)

    Maltby, L.; Arnold, D.; Arts, G.H.P.; Davies, J.; Heimbach, F.; Pickl, C.; Poulsen, V.

    2009-01-01

    Given the essential role that primary producers play in aquatic ecosystems, it is imperative that the potential risk of pesticides to the structure and functioning of aquatic plants is adequately assessed. This book discusses the assessment of the risk of pesticides with herbicidal activity to

  1. Risk assessment and risk transfer from an insurerś point of view

    Science.gov (United States)

    Ebner, G.

    2009-04-01

    Risk, a word that causes a lot of associations in human brains. Many of us don't like risks. Since hundreds of years insurance is the most common way to get rid of the financial consequences when risks convert to damages. This article deals with commercial risks and the possibilities of risk transfer, an important task within the field of risk management. For commercial entities it is very important to transfer risks, threatening the competitiveness or even worse the existence of a company. At the beginning of insurance it was more the less a bet between merchants and rich people. Later on mutual societies were taking place. Today we see a complex insurance industry with insurers, reinsurers, self insuring possibilities via captives and much more. This complex system, with all the different ways to deal with risk transfer requires a professional risk assessment! Risk assessment is based on knowledge about the threatened assets, the likelihood that they will be damaged, the threats and the possibilities to protect these assets. Assets may be tangible or intangible. Assessing risks is not a precise calculation that delivers a result without any doubt. But insurers and insured need a basis to fix a premium, both of them can agree. This contribution will present a system to assess risks and to find the right risk-transfer-premiums.

  2. Risk assessment and management in IOR projects

    International Nuclear Information System (INIS)

    Goodyear, S.G.; Gregory, A.T.

    1994-01-01

    The application of IOR techniques is one of the investment opportunities open to Exploration and Production companies. A project will only go forward if the perceived balance between the rewards and the risks is acceptable. IOR projects may be ruled out because they are considered to involve significantly higher risks than conventional developments. Therefore, some means of evaluating the actual level of risk may be required if the full economic benefits from IOR techniques are to be realized. Risk assessment is a key element in safety cases, where a well-established methodology for quantifying risk exists. This paper discusses the extension of these methods to IOR project risk assessment. Combining reservoir and IOR technique uncertainties with their impact on project performance allows project risk to be better quantified. The results of the risk assessment are presented in terms of a risk-reward diagram that plots the probability surface for possible project outcomes as a function of NPV (reward) and exposure (risk)

  3. Risk assessment and nuclear power

    International Nuclear Information System (INIS)

    Bodansky, D.

    1982-01-01

    The range of risk perceptions involving nuclear power is so great that there is little hope of bridging extreme positions, but a consensus based upon reasoned discussion among uncommitted people could determine a sensible path. Our concerns over the uncertainties of risk assessment have made it increasingly difficult to make responsible decisions fast enough to deal with modern needs. The result is an immobility in energy matters that can point to a 2% reduction in oil use as its only triumph. The risk of nuclear war as a result of military action over energy issues suggests to some that the solution is to abolish nuclear power (however impractical) and to others that a rapid spread of nuclear power will eliminate energy as an incentive for war. If nuclear war is the major risk to consider, risk assessments need to include the risks of war, as well as those of carbon dioxide buildup and socio-economic disruptions, all of which loom larger than the risks of nuclear-plant accidents. Energy choices should be aimed at diminishing these major risks, even if they include the use of nuclear power. 26 references

  4. Information risk in emerging utility markets: The role of commission- sponsored audits

    Energy Technology Data Exchange (ETDEWEB)

    Wirick, D.W.; Lawton, R.W.; Burns, R.E.; Lee, S.

    1996-03-01

    As public utilities and regulators begin to define their new relationship under various forms of regulations, some have questioned the continuing need for commission-sponsored audits. This study evaluates the role of such audits by examining their core purpose: the reduction of information risk (risk that a commission might make a wrong decision because of reliance on faulty information). It identifies five generic types of information that will be needed by commissions in the future and describes a cost-benefit analysis for identifying the appropriate method for mitigating information risk for state regulatory commissions.

  5. Risk assessment handbook

    International Nuclear Information System (INIS)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG ampersand G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established

  6. Risk Assessment of Genetically Modified Microorganisms

    DEFF Research Database (Denmark)

    Jacobsen, B. L.; Wilcks, Andrea

    2001-01-01

    the industry, national administration and research institutions were gathered to discuss which elements should be considered in a risk assessment of genetically modified microorganisms used as food or food ingredients. The existing EU and national regulations were presented, together with the experiences......The rapid development of recombinant DNA techniques for food organisms urges for an ongoing discussion on the risk assessment of both new as traditional use of microorganisms in food production. This report, supported by the Nordic Council of Ministers, is the result of a workshop where people from...... with risk assessment of these organisms in each Nordic country....

  7. Slope Hazard and Risk Assessment in the Tropics: Malaysia' Experience

    Science.gov (United States)

    Mohamad, Zakaria; Azahari Razak, Khamarrul; Ahmad, Ferdaus; Manap, Mohamad Abdul; Ramli, Zamri; Ahmad, Azhari; Mohamed, Zainab

    2015-04-01

    The increasing number of geological hazards in Malaysia has often resulted in casualties and extensive devastation with high mitigation cost. Given the destructive capacity and high frequency of disaster, Malaysia has taken a step forward to address the multi-scale landslide risk reduction emphasizing pre-disaster action rather than post-disaster reaction. Slope hazard and risk assessment in a quantitative manner at regional and national scales remains challenging in Malaysia. This paper presents the comprehensive methodology framework and operational needs driven by modern and advanced geospatial technology to address the aforementioned issues in the tropics. The Slope Hazard and Risk Mapping, the first national project in Malaysia utilizing the multi-sensor LIDAR has been critically implemented with the support of multi- and trans-disciplinary partners. The methodological model has been formulated and evaluated given the complexity of risk scenarios in this knowledge driven project. Instability slope problems in the urban, mountainous and tectonic landscape are amongst them, and their spatial information is of crucial for regional landslide assessment. We develop standard procedures with optimal parameterization for susceptibility, hazard and risk assessment in the selected regions. Remarkably, we are aiming at producing an utmost complete landslide inventory in both space and time. With the updated reliable terrain and landscape models, the landslide conditioning factor maps can be accurately derived depending on the landslide types and failure mechanisms which crucial for hazard and risk assessment. We also aim to improve the generation of elements at risk for landslide and promote integrated approaches for a better disaster risk analysis. As a result, a new tool, notably multi-sensor LIDAR technology is a very promising tool for an old geological problem and its derivative data for hazard and risk analysis is an effective preventive measure in Malaysia

  8. Construction scheduled delay risk assessment by using combined AHP-RII methodology for an international NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Hossen, Mufazal Muhammed; Kang, Sun Koo; Kim, Jong Hyun [KEPCO International Nuclear Graduate School (KINGS), Ulsan (Korea, Republic of)

    2015-04-15

    In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

  9. Construction scheduled delay risk assessment by using combined AHP-RII methodology for an international NPP project

    International Nuclear Information System (INIS)

    Hossen, Mufazal Muhammed; Kang, Sun Koo; Kim, Jong Hyun

    2015-01-01

    In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs

  10. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  11. PoCos: Population Covering Locus Sets for Risk Assessment in Complex Diseases.

    Directory of Open Access Journals (Sweden)

    Marzieh Ayati

    2016-11-01

    Full Text Available Susceptibility loci identified by GWAS generally account for a limited fraction of heritability. Predictive models based on identified loci also have modest success in risk assessment and therefore are of limited practical use. Many methods have been developed to overcome these limitations by incorporating prior biological knowledge. However, most of the information utilized by these methods is at the level of genes, limiting analyses to variants that are in or proximate to coding regions. We propose a new method that integrates protein protein interaction (PPI as well as expression quantitative trait loci (eQTL data to identify sets of functionally related loci that are collectively associated with a trait of interest. We call such sets of loci "population covering locus sets" (PoCos. The contributions of the proposed approach are three-fold: 1 We consider all possible genotype models for each locus, thereby enabling identification of combinatorial relationships between multiple loci. 2 We develop a framework for the integration of PPI and eQTL into a heterogenous network model, enabling efficient identification of functionally related variants that are associated with the disease. 3 We develop a novel method to integrate the genotypes of multiple loci in a PoCo into a representative genotype to be used in risk assessment. We test the proposed framework in the context of risk assessment for seven complex diseases, type 1 diabetes (T1D, type 2 diabetes (T2D, psoriasis (PS, bipolar disorder (BD, coronary artery disease (CAD, hypertension (HT, and multiple sclerosis (MS. Our results show that the proposed method significantly outperforms individual variant based risk assessment models as well as the state-of-the-art polygenic score. We also show that incorporation of eQTL data improves the performance of identified POCOs in risk assessment. We also assess the biological relevance of PoCos for three diseases that have similar biological mechanisms

  12. INCORPORATING NONCHEMICAL STRESSORS INTO CUMMULATIVE RISK ASSESSMENTS

    Science.gov (United States)

    The risk assessment paradigm has begun to shift from assessing single chemicals using "reasonable worst case" assumptions for individuals to considering multiple chemicals and community-based models. Inherent in community-based risk assessment is examination of all stressors a...

  13. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2000-01-01

    The Nevada Risk Assessment/Management Program (NRAMP) is part of a national effort by the U.S. Department of Energy (DOE) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the NRAMP project and presents a synopsis of the NRAMP effort which occurred from 1995 to 2000. The primary goals of the DOE in awarding the cooperative agreement establishing NRAMP were to (I) use a risk-based approach to evaluate the consequences of alternative actions in DOE's Environmental Remediation Programs at sites in Nevada and (2) use a neutral and credible institution outside the DOE to perform the risk assessments and contribute to public education about environmental management issues at the Nevada Test Site. (author)

  14. Approaches to risk assessment in food allergy

    DEFF Research Database (Denmark)

    Madsen, Charlotte Bernhard; Hattersley, S.; Buck, J.

    2009-01-01

    modelling is considered to be the most promising approach for use in population risk assessment (which is a particular focus for risk managers). For all approaches, further improvement of input data is desirable, particularly data on consumption patterns/food choices in food allergic consumers, data...... models. The workshop concluded that all the three approaches to safety and risk assessment of allergenic foods should continue to be considered. A particular strength of the MoE and probabilistic approaches is that they do not rely on low-dose extrapolations with its inherent issues. Probabilistic......A workshop was organised to investigate whether risk assessment strategies and methodologies used in classical/conventional toxicology may be used for risk assessment of allergenic foods. to discuss the advantages and limitations of different approaches and to determine the research needed to move...

  15. Hanford waste vitrification systems risk assessment

    International Nuclear Information System (INIS)

    Miller, W.C.; Hamilton, D.W.; Holton, L.K.; Bailey, J.W.

    1991-09-01

    A systematic Risk Assessment was performed to identify the technical, regulatory, and programmatic uncertainties and to quantify the risks to the Hanford Site double-shell tank waste vitrification program baseline (as defined in December 1990). Mitigating strategies to reduce the overall program risk were proposed. All major program elements were evaluated, including double-shell tank waste characterization, Tank Farms, retrieval, pretreatment, vitrification, and grouting. Computer-based techniques were used to quantify risks to proceeding with construction of the Hanford Waste Vitrification Plant on the present baseline schedule. Risks to the potential vitrification of single-shell tank wastes and cesium and strontium capsules were also assessed. 62 refs., 38 figs., 26 tabs

  16. Utility of high-resolution computed tomography for predicting risk of sputum smear-negative pulmonary tuberculosis

    International Nuclear Information System (INIS)

    Nakanishi, Masanori; Demura, Yoshiki; Ameshima, Shingo; Kosaka, Nobuyuki; Chiba, Yukio; Nishikawa, Satoshi; Itoh, Harumi; Ishizaki, Takeshi

    2010-01-01

    Background: To diagnose sputum smear-negative pulmonary tuberculosis (PTB) is difficult and the ability of high-resolution computed tomography (HRCT) for diagnosing PTB has remained unclear in the sputum smear-negative setting. We retrospectively investigated whether or not this imaging modality can predict risk for sputum smear-negative PTB. Methods: We used HRCT to examine the findings of 116 patients with suspected PTB despite negative sputum smears for acid-fast bacilli (AFB). We investigated their clinical features and HRCT-findings to predict the risk for PTB by multivariate analysis and a combination of HRCT findings by stepwise regression analysis. We then designed provisional HRCT diagnostic criteria based on these results to rank the risk of PTB and blinded observers assessed the validity and reliability of these criteria. Results: A positive tuberculin skin test alone among clinical laboratory findings was significantly associated with an increase of risk of PTB. Multivariate regression analysis showed that large nodules, tree-in-bud appearance, lobular consolidation and the main lesion being located in S1, S2, and S6 were significantly associated with an increased risk of PTB. Stepwise regression analysis showed that coexistence of the above 4 factors was most significantly associated with an increase in the risk for PTB. Ranking of the results using our HRCT diagnostic criteria by blinded observers revealed good utility and agreement for predicting PTB risk. Conclusions: Even in the sputum smear-negative setting, HRCT can predict the risk of PTB with good reproducibility and can select patients having a high probability of PTB.

  17. Utility of high-resolution computed tomography for predicting risk of sputum smear-negative pulmonary tuberculosis

    Energy Technology Data Exchange (ETDEWEB)

    Nakanishi, Masanori [Departments of Respiratory Medicine, Faculty of Medical Sciences, University of Fukui, 23 Shimoaizuki Eiheizi-cho, Fukui 910-1193 (Japan)], E-mail: mnakanishi@nifty.ne.jp; Demura, Yoshiki; Ameshima, Shingo [Departments of Respiratory Medicine, Faculty of Medical Sciences, University of Fukui, 23 Shimoaizuki Eiheizi-cho, Fukui 910-1193 (Japan); Kosaka, Nobuyuki [Departments of Radiology, Faculty of Medical Sciences, University of Fukui, 23 Shimoaizuki Eiheizi-cho, Fukui 910-1193 (Japan); Chiba, Yukio [Department of Respiratory Medicine, National Hospital Organization, Fukui Hospital, Tsuruga, Fukui 914-0195 (Japan); Nishikawa, Satoshi [Department of Radiology, National Hospital Organization, Fukui Hospital, Tsuruga, Fukui 914-0195 (Japan); Itoh, Harumi [Departments of Radiology, Faculty of Medical Sciences, University of Fukui, 23 Shimoaizuki Eiheizi-cho, Fukui 910-1193 (Japan); Ishizaki, Takeshi [Departments of Respiratory Medicine, Faculty of Medical Sciences, University of Fukui, 23 Shimoaizuki Eiheizi-cho, Fukui 910-1193 (Japan)

    2010-03-15

    Background: To diagnose sputum smear-negative pulmonary tuberculosis (PTB) is difficult and the ability of high-resolution computed tomography (HRCT) for diagnosing PTB has remained unclear in the sputum smear-negative setting. We retrospectively investigated whether or not this imaging modality can predict risk for sputum smear-negative PTB. Methods: We used HRCT to examine the findings of 116 patients with suspected PTB despite negative sputum smears for acid-fast bacilli (AFB). We investigated their clinical features and HRCT-findings to predict the risk for PTB by multivariate analysis and a combination of HRCT findings by stepwise regression analysis. We then designed provisional HRCT diagnostic criteria based on these results to rank the risk of PTB and blinded observers assessed the validity and reliability of these criteria. Results: A positive tuberculin skin test alone among clinical laboratory findings was significantly associated with an increase of risk of PTB. Multivariate regression analysis showed that large nodules, tree-in-bud appearance, lobular consolidation and the main lesion being located in S1, S2, and S6 were significantly associated with an increased risk of PTB. Stepwise regression analysis showed that coexistence of the above 4 factors was most significantly associated with an increase in the risk for PTB. Ranking of the results using our HRCT diagnostic criteria by blinded observers revealed good utility and agreement for predicting PTB risk. Conclusions: Even in the sputum smear-negative setting, HRCT can predict the risk of PTB with good reproducibility and can select patients having a high probability of PTB.

  18. International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

    Science.gov (United States)

    Hernandez-Pellerano, Amri; Iannello, Christopher J.; Garrett, Henry B.; Ging, Andrew T.; Katz, Ira; Keith, R. Lloyd; Minow, Joseph I.; Willis, Emily M.; Schneider, Todd A.; Whittlesey, Edward J.; hide

    2014-01-01

    The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the

  19. Assessment of Global Wind Energy Resource Utilization Potential

    Science.gov (United States)

    Ma, M.; He, B.; Guan, Y.; Zhang, H.; Song, S.

    2017-09-01

    Development of wind energy resource (WER) is a key to deal with climate change and energy structure adjustment. A crucial issue is to obtain the distribution and variability of WER, and mine the suitable location to exploit it. In this paper, a multicriteria evaluation (MCE) model is constructed by integrating resource richness and stability, utilization value and trend of resource, natural environment with weights. The global resource richness is assessed through wind power density (WPD) and multi-level wind speed. The utilizable value of resource is assessed by the frequency of effective wind. The resource stability is assessed by the coefficient of variation of WPD and the frequency of prevailing wind direction. Regression slope of long time series WPD is used to assess the trend of WER. All of the resource evaluation indicators are derived from the atmospheric reanalysis data ERA-Interim with spatial resolution 0.125°. The natural environment factors mainly refer to slope and land-use suitability, which are derived from multi-resolution terrain elevation data 2010 (GMTED 2010) and GlobalCover2009. Besides, the global WER utilization potential map is produced, which shows most high potential regions are located in north of Africa. Additionally, by verifying that 22.22 % and 48.8 9% operational wind farms fall on medium-high and high potential regions respectively, the result can provide a basis for the macroscopic siting of wind farm.

  20. Analysis of existing risk assessments, and list of suggestions

    CERN Document Server

    Heimsch, Laura

    2016-01-01

    The scope of this project was to analyse risk assessments made at CERN and extracting some crucial information about the different methodologies used, profiles of people who make the risk assessments, and gathering information of whether the risk matrix was used and if the acceptable level of risk was defined. Second step of the project was to trigger discussion inside HSE about risk assessment by suggesting a risk matrix and a risk assessment template.

  1. Risk monitor-a tool for computer aided risk assessment for NPPs

    International Nuclear Information System (INIS)

    Vinod, Gopika; Saraf, R.K.; Babar, A.K.; Kushwaha, H.S.; Hadap, Nikhil

    2001-01-01

    Considerable changes occur in components status and system design and subsequent operation due to changes in plant configuration and their operating procedures. These changes are organised because some components are randomly down and other can be planned for test, maintenance and repair. This results in a fluctuation of risk level over operating time, which is termed as risk profile. Probabilistic Safety Assessment (PSA) is an analytical technique for assessing the risk by integrating diverse aspects of design and operation of a Nuclear Power Plant. Risk can be defined as the product of the probability of an accident and the consequences from that accident. Reactor Safety Division of BARC has developed PC based tool, which can assess the risk profile. This package can be used to optimise the operation in Nuclear Power Plants with respect to a minimum risk level over the operating time, and is termed as Risk Monitor. Risk Monitor is user friendly and can re-evaluate core damage frequency for changes in component status, test interval, initiating event frequency etc. Plant restoration advice, when the plant is in high risk configuration, current status of all plant equipment, and equipment prioritization are also provided by the package. (author)

  2. Site remediation guided by risk assessment

    International Nuclear Information System (INIS)

    McBean, E.A.; Gowing, A.; Pieczonka, G.

    2002-01-01

    'Full text:' Risk assessment (RA) provides an effective tool for identifying hazards with respect to human health and ecological receptors, hazards that arise from contaminants in the environment. Risk assessment relies upon: hazard identification/problem formulation; toxicity assessment; exposure assessment; and risk characterization. Hence, risk assessment provides an effective guide for site remediation through the identification of the associated risks arising from pre- and potential post-remediation activities. As a demonstration of this decision-making process, a site-specific risk assessment (SSRA) was performed on a chemical producing facility. Historical waste practices during the production of DDT compounds resulted in impacted site soils and sediment and soils of the creek passing through the facility. The purpose of the SSRA was to derive site-specific cleanup values for the impacted on-site soils, creek sediments, and embankment soils, incorporating human and ecological receptors associated with the environmental media. The human exposure pathways considered were dermal contact, incidental ingestion, and inhalation of the various soils. The potential human receptors were industrial workers, construction workers, trespassers, and off-site residents. Ingestion of fish from the creek by residents was also evaluated in the human health risk assessment (HHRA). Food web analyses were used to evaluate the impact of exposure to chemical compounds in aquatic sediments and related soils by ecological receptors such as the great blue heron, raccoon, and mink. The SSRA involved modelling the daily chemical intake by receptors and the transfer of chemicals to identified secondary media (e.g., ambient air or animal tissues) that are also potential exposure media. These models, while using the site-specific chemical data in the source media, possess uncertainties associated with default parameters that are only approximations and not site-specific (e.g., soil

  3. Surgery Risk Assessment (SRA) Database

    Data.gov (United States)

    Department of Veterans Affairs — The Surgery Risk Assessment (SRA) database is part of the VA Surgical Quality Improvement Program (VASQIP). This database contains assessments of selected surgical...

  4. Utility of Exercise Testing and Adenosine Response for Risk Assessment in Children with Wolff-Parkinson-White Syndrome.

    Science.gov (United States)

    Ergul, Yakup; Ozturk, Erkut; Ozyilmaz, Isa; Unsal, Serkan; Carus, Hayat; Tola, Hasan Tahsin; Tanidir, Ibrahim Cansaran; Guzeltas, Alper

    2015-01-01

    We aimed to determine the correlation between noninvasive testing (exercise stress testing [EST] and adenosine responsiveness of accessory pathway [AP] ) and invasive electrophysiology study (EPS) for assessment antegrade conduction of the AP in Wolff-Parkinson-White syndrome. This prospective, observational study enrolled 40 children (58% male children, median age of 13 years, and median weight of 47.5 kg) with Wolff-Parkinson-White syndrome. Conduction through the AP to a cycle length of ≤250 ms was considered rapid or high-risk; otherwise, patients were nonrapid or low-risk. The sudden disappearance of the delta-wave was seen in 10 cases (25%) during EST. Accessory pathway was found to be high-risk in 13 cases (13/40, 32.5%) while the accessory path was identified as low-risk in 27 cases; however, six patients (15%) had blocked AP conduction with adenosine during EPS. Low-risk classification by EST alone to identify patients with nonrapid conduction in baseline EPS had a specificity of 93% and a positive predictive value of 90% (accuracy 54%). Blocked AP conduction with adenosine as a marker of nonrapid baseline AP conduction had a specificity of 93% and a positive predictive value of 84%. Finally, AP was adenosine nonresponsive in the majority of patients (28/30, 93%) with persistent delta-waves, 40% of those who had a sudden disappearance of delta-waves had an adenosine-responsive AP (P value: .028). Abrupt loss of preexcitation during EST and blocked AP conduction with adenosine had high specificity and positive predictive value for nonrapid and low-risk antegrade conduction during baseline invasive EPS. Successful risk stratification of pediatric patients with Wolff-Parkinson-White is possible through the use of EST and the adenosine responsiveness of AP. © 2015 Wiley Periodicals, Inc.

  5. Cultural heuristics in risk assessment of HIV/AIDS

    NARCIS (Netherlands)

    Bailey, A.; Hutter, I.

    2006-01-01

    Behaviour change models in HIV prevention tend to consider that risky sexual behaviours reflect risk assessments and that by changing risk assessments behaviour can be changed. Risk assessment is however culturally constructed. Individuals use heuristics or bounded cognitive devices derived from

  6. Integrating mechanistic and polymorphism data to characterize human genetic susceptibility for environmental chemical risk assessment in the 21st century

    International Nuclear Information System (INIS)

    Mortensen, Holly M.; Euling, Susan Y.

    2013-01-01

    Response to environmental chemicals can vary widely among individuals and between population groups. In human health risk assessment, data on susceptibility can be utilized by deriving risk levels based on a study of a susceptible population and/or an uncertainty factor may be applied to account for the lack of information about susceptibility. Defining genetic susceptibility in response to environmental chemicals across human populations is an area of interest in the NAS' new paradigm of toxicity pathway-based risk assessment. Data from high-throughput/high content (HT/HC), including -omics (e.g., genomics, transcriptomics, proteomics, metabolomics) technologies, have been integral to the identification and characterization of drug target and disease loci, and have been successfully utilized to inform the mechanism of action for numerous environmental chemicals. Large-scale population genotyping studies may help to characterize levels of variability across human populations at identified target loci implicated in response to environmental chemicals. By combining mechanistic data for a given environmental chemical with next generation sequencing data that provides human population variation information, one can begin to characterize differential susceptibility due to genetic variability to environmental chemicals within and across genetically heterogeneous human populations. The integration of such data sources will be informative to human health risk assessment

  7. Defining Probability in Sex Offender Risk Assessment.

    Science.gov (United States)

    Elwood, Richard W

    2016-12-01

    There is ongoing debate and confusion over using actuarial scales to predict individuals' risk of sexual recidivism. Much of the debate comes from not distinguishing Frequentist from Bayesian definitions of probability. Much of the confusion comes from applying Frequentist probability to individuals' risk. By definition, only Bayesian probability can be applied to the single case. The Bayesian concept of probability resolves most of the confusion and much of the debate in sex offender risk assessment. Although Bayesian probability is well accepted in risk assessment generally, it has not been widely used to assess the risk of sex offenders. I review the two concepts of probability and show how the Bayesian view alone provides a coherent scheme to conceptualize individuals' risk of sexual recidivism.

  8. Completion of risk assessment and monitoring within forensic psychiatry.

    Science.gov (United States)

    Galappathie, Nuwan; Heeramun, Ragini; Jethwa, Krishma

    2009-04-01

    There is a clear need for high standards of risk assessment and monitoring within forensic psychiatry. This has been highlighted by a number of high profile homicide enquires which have called for better standards of multidisciplinary risk assessment and monitoring. There are no national standards for risk assessment. We conducted a study to audit electronically the completion rate of a service-designed risk assessment document within Fromside, a medium secure unit in the UK. The completion rates for key sections of 64 risk assessment documents were assessed. Only 48 of the 64 (75%) documents were electronically available. The completion rates ranged from 59/64 (92%) for the retrospective risk review to 46/64 (72%) for relapse indicators. Only 35/64 (55%) risk documents were updated within the last three months. We found that the use of risk profile documents has helped achieve good standards of risk assessment, however greater priority needs to be given to ongoing monitoring. We recommend that consideration is given to the development of national guidelines for multidisciplinary risk assessment and monitoring.

  9. SU-F-T-246: Evaluation of Healthcare Failure Mode And Effect Analysis For Risk Assessment

    International Nuclear Information System (INIS)

    Harry, T; Manger, R; Cervino, L; Pawlicki, T

    2016-01-01

    Purpose: To evaluate the differences between the Veteran Affairs Healthcare Failure Modes and Effect Analysis (HFMEA) and the AAPM Task Group 100 Failure and Effect Analysis (FMEA) risk assessment techniques in the setting of a stereotactic radiosurgery (SRS) procedure were compared respectively. Understanding the differences in the techniques methodologies and outcomes will provide further insight into the applicability and utility of risk assessments exercises in radiation therapy. Methods: HFMEA risk assessment analysis was performed on a stereotactic radiosurgery procedure. A previous study from our institution completed a FMEA of our SRS procedure and the process map generated from this work was used for the HFMEA. The process of performing the HFMEA scoring was analyzed, and the results from both analyses were compared. Results: The key differences between the two risk assessments are the scoring criteria for failure modes and identifying critical failure modes for potential hazards. The general consensus among the team performing the analyses was that scoring for the HFMEA was simpler and more intuitive then the FMEA. The FMEA identified 25 critical failure modes while the HFMEA identified 39. Seven of the FMEA critical failure modes were not identified by the HFMEA and 21 of the HFMEA critical failure modes were not identified by the FMEA. HFMEA as described by the Veteran Affairs provides guidelines on which failure modes to address first. Conclusion: HFMEA is a more efficient model for identifying gross risks in a process than FMEA. Clinics with minimal staff, time and resources can benefit from this type of risk assessment to eliminate or mitigate high risk hazards with nominal effort. FMEA can provide more in depth details but at the cost of elevated effort.

  10. SU-F-T-246: Evaluation of Healthcare Failure Mode And Effect Analysis For Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Harry, T [Oregon State University, Corvallis, OR (United States); University of California, San Diego, La Jolla, CA (United States); Manger, R; Cervino, L; Pawlicki, T [University of California, San Diego, La Jolla, CA (United States)

    2016-06-15

    Purpose: To evaluate the differences between the Veteran Affairs Healthcare Failure Modes and Effect Analysis (HFMEA) and the AAPM Task Group 100 Failure and Effect Analysis (FMEA) risk assessment techniques in the setting of a stereotactic radiosurgery (SRS) procedure were compared respectively. Understanding the differences in the techniques methodologies and outcomes will provide further insight into the applicability and utility of risk assessments exercises in radiation therapy. Methods: HFMEA risk assessment analysis was performed on a stereotactic radiosurgery procedure. A previous study from our institution completed a FMEA of our SRS procedure and the process map generated from this work was used for the HFMEA. The process of performing the HFMEA scoring was analyzed, and the results from both analyses were compared. Results: The key differences between the two risk assessments are the scoring criteria for failure modes and identifying critical failure modes for potential hazards. The general consensus among the team performing the analyses was that scoring for the HFMEA was simpler and more intuitive then the FMEA. The FMEA identified 25 critical failure modes while the HFMEA identified 39. Seven of the FMEA critical failure modes were not identified by the HFMEA and 21 of the HFMEA critical failure modes were not identified by the FMEA. HFMEA as described by the Veteran Affairs provides guidelines on which failure modes to address first. Conclusion: HFMEA is a more efficient model for identifying gross risks in a process than FMEA. Clinics with minimal staff, time and resources can benefit from this type of risk assessment to eliminate or mitigate high risk hazards with nominal effort. FMEA can provide more in depth details but at the cost of elevated effort.

  11. Air toxics: A new concern for the utility industry

    International Nuclear Information System (INIS)

    Torrens, I.; Chow, W.

    1992-01-01

    The 1990 Clean Air Acts Amendments call for EPA studies on utility emissions of potentially hazardous air pollutants and their impact, prior to any decision on regulation of these emissions. The Electric Power Research Institute is carrying out a comprehensive assessment of air toxics risk assessment, consisting of data compilation and analysis, field measurements of priority air toxics at power plants and test facilities, atmospheric transport and deposition, and health/ecological risk assessment. The paper reports on progress to data and objectives of the EPRI assessment

  12. Quantifying risk and accuracy in cancer risk assessment: the process and its role in risk management problem-solving.

    Science.gov (United States)

    Turturro, A; Hart, R W

    1987-01-01

    A better understanding of chemical-induced cancer has led to appreciation of similarities to problems addressed by risk management of radiation-induced toxicity. Techniques developed for cancer risk assessment of toxic substances can be generalized to toxic agents. A recent problem-solving approach for risk management of toxic substances developed for the U.S. Department of Health and Human Services, and the role of risk assessment and how uncertainty should be treated within the context of this approach, is discussed. Finally, two different methods, research into the assumptions underlying risk assessment and the modification of risk assessment/risk management documents, are used to illustrate how the technique can be applied.

  13. Risk Assessment for an Unmanned Merchant Ship

    Directory of Open Access Journals (Sweden)

    Ø.J. Rødseth

    2015-09-01

    Full Text Available The MUNIN project is doing a feasibility study on an unmanned bulk carrier on an intercontinental voyage. To develop the technical and operational concepts, MUNIN has used a risk-based design method, based on the Formal Safety Analysis method which is also recommended by the International Mari-time Organization. Scenario analysis has been used to identify risks and to simplify operational scope. Systematic hazard identification has been used to find critical safety and security risks and how to address these. Technology and operational concept testing is using a hypothesis-based test method, where the hypotheses have been created as a result of the risk assessment. Finally, the cost-benefit assessment will also use results from the risk assessment. This paper describes the risk assessment method, some of the most important results and also describes how the results have been or will be used in the different parts of the project.

  14. Hanford Site Risk Assessment Methodology. Revision 3

    International Nuclear Information System (INIS)

    1995-05-01

    This methodology has been developed to prepare human health and ecological evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigations (RI) and the Resource conservation and Recovery Act of 1976 (RCRA) facility investigations (FI) performed at the Hanford Site pursuant to the hanford Federal Facility Agreement and Consent Order (Ecology et al. 1994), referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies site-specific risk assessment considerations and integrates them with approaches for evaluating human and ecological risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site

  15. Assessment and uncertainty analysis of groundwater risk.

    Science.gov (United States)

    Li, Fawen; Zhu, Jingzhao; Deng, Xiyuan; Zhao, Yong; Li, Shaofei

    2018-01-01

    Groundwater with relatively stable quantity and quality is commonly used by human being. However, as the over-mining of groundwater, problems such as groundwater funnel, land subsidence and salt water intrusion have emerged. In order to avoid further deterioration of hydrogeological problems in over-mining regions, it is necessary to conduct the assessment of groundwater risk. In this paper, risks of shallow and deep groundwater in the water intake area of the South-to-North Water Transfer Project in Tianjin, China, were evaluated. Firstly, two sets of four-level evaluation index system were constructed based on the different characteristics of shallow and deep groundwater. Secondly, based on the normalized factor values and the synthetic weights, the risk values of shallow and deep groundwater were calculated. Lastly, the uncertainty of groundwater risk assessment was analyzed by indicator kriging method. The results meet the decision maker's demand for risk information, and overcome previous risk assessment results expressed in the form of deterministic point estimations, which ignore the uncertainty of risk assessment. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Risk assessment using probabilistic standards

    International Nuclear Information System (INIS)

    Avila, R.

    2004-01-01

    A core element of risk is uncertainty represented by plural outcomes and their likelihood. No risk exists if the future outcome is uniquely known and hence guaranteed. The probability that we will die some day is equal to 1, so there would be no fatal risk if sufficiently long time frame is assumed. Equally, rain risk does not exist if there was 100% assurance of rain tomorrow, although there would be other risks induced by the rain. In a formal sense, any risk exists if, and only if, more than one outcome is expected at a future time interval. In any practical risk assessment we have to deal with uncertainties associated with the possible outcomes. One way of dealing with the uncertainties is to be conservative in the assessments. For example, we may compare the maximal exposure to a radionuclide with a conservatively chosen reference value. In this case, if the exposure is below the reference value then it is possible to assure that the risk is low. Since single values are usually compared; this approach is commonly called 'deterministic'. Its main advantage lies in the simplicity and in that it requires minimum information. However, problems arise when the reference values are actually exceeded or might be exceeded, as in the case of potential exposures, and when the costs for realizing the reference values are high. In those cases, the lack of knowledge on the degree of conservatism involved impairs a rational weighing of the risks against other interests. In this presentation we will outline an approach for dealing with uncertainties that in our opinion is more consistent. We will call it a 'fully probabilistic risk assessment'. The essence of this approach consists in measuring the risk in terms of probabilities, where the later are obtained from comparison of two probabilistic distributions, one reflecting the uncertainties in the outcomes and one reflecting the uncertainties in the reference value (standard) used for defining adverse outcomes. Our first aim

  17. Assessment of mercury health risks to adults from coal combustion

    Energy Technology Data Exchange (ETDEWEB)

    Lipfert, F.W.; Moskowitz, P.D.; Fthenakis, V.M.; DePhillips, M.P.; Viren, J.; Saroff, L.

    1994-05-01

    The U.S. Environmental Protection Agency (EPA) is preparing, for the U.S. Congress, a report evaluating the need to regulate mercury (Hg) emissions from electric utilities. This study, to be completed in 1995, will have important health and economic implications. In support of these efforts, the U.S. Department of Energy, Office of Fossil Energy, sponsored a risk assessment project at Brookhaven National Laboratory (BNL) to evaluate methylmercury (MeHg) hazards independently. In the BNL study, health risks to adults resulting from Hg emissions from a hypothetical 1000 MW{sub e} coal-fired power plant were estimated using probabilistic risk assessment techniques. The approach draws on the extant knowledge in each of the important steps in the calculation chain from emissions to health effects. Estimated results at key points in the chain were compared with actual measurements to help validate the modeled estimates. Two cases were considered: the baseline case (no local impacts), and the impact case (maximum local power-plant impact). The BNL study showed that the effects of emissions of a single power plant may double the background exposures to MeHg resulting from consuming fish obtained from a localized area near the power plant. Many implicit and explicit sources of uncertainty exist in this analysis. Those that appear to be most in need of improvement include data on doses and responses for potentially sensitive subpopulations (e.g., fetal exposures). Rather than considering hypothetical situations, it would also be preferable to assess the risks associated with actual coal-fired power plants and the nearby sensitive water bodies and susceptible subpopulations. Finally, annual total Hg emissions from coal burning and from other anthropogenic sources are still uncertain; this makes it difficult to estimate the effects of U.S. coal burning on global Hg concentration levels, especially over the long term.

  18. Systems Toxicology: The Future of Risk Assessment.

    Science.gov (United States)

    Sauer, John Michael; Hartung, Thomas; Leist, Marcel; Knudsen, Thomas B; Hoeng, Julia; Hayes, A Wallace

    2015-01-01

    Risk assessment, in the context of public health, is the process of quantifying the probability of a harmful effect to individuals or populations from human activities. With increasing public health concern regarding the potential risks associated with chemical exposure, there is a need for more predictive and accurate approaches to risk assessment. Developing such an approach requires a mechanistic understanding of the process by which xenobiotic substances perturb biological systems and lead to toxicity. Supplementing the shortfalls of traditional risk assessment with mechanistic biological data has been widely discussed but not routinely implemented in the evaluation of chemical exposure. These mechanistic approaches to risk assessment have been generally referred to as systems toxicology. This Symposium Overview article summarizes 4 talks presented at the 35th Annual Meeting of the American College of Toxicology. © The Author(s) 2015.

  19. Risk assessment in support of plant health

    DEFF Research Database (Denmark)

    Jeger, Michael; Schans, Jan; Lövei, Gabor L.

    2012-01-01

    environmental risk assessment and the evaluation of risk reducing options. Quantitative approaches have become increasingly important during this time. The Panel has developed such methods in climatic mapping (in association with the Joint Research Councils), application of spatial spread models, re......With the establishment of the Plant Health Panel in 2006, EFSA became the body responsible for risk assessment in the plant health area for the European Union (EU). Since then more than 70 outputs have been produced dealing with the full range of organisms harmful to plant health across all crop...... types and plants in the environment. There has been an increasing trend towards producing scientific opinions which are full pest risk assessments for the whole EU territory. In its work, and as a contribution to the wider development of risk assessment methodology, the Panel has developed a series...

  20. Performing the lockout/tagout risk assessment.

    Science.gov (United States)

    Wallace, W Jon

    2007-03-01

    Lockout/tagout provides the greatest level routine, repetitive, and integral to the production process, a risk assessment should be performed. If the task performed poses an unacceptable risk, acceptable risk reduction methods should be implemented to reduce the risk to acceptable levels.

  1. Bioassay-based risk assessment of complex mixtures

    International Nuclear Information System (INIS)

    Donnelly, K.C.; Huebner, H.J.

    1996-01-01

    The baseline risk assessment often plays an integral role in various decision-making processes at Superfund sites. The present study reports on risk characterizations prepared for seven complex mixtures using biological and chemical analysis. Three of the samples (A, B, and C) were complex mixtures of polycyclic aromatic hydrocarbons (PAHs) extracted from coal tar; while four samples extracted from munitions-contaminated soil contained primarily nitroaromatic hydrocarbons. The chemical-based risk assessment ranked sample C as least toxic, while the risk associated with samples A and B was approximately equal. The microbial bioassay was in general agreement for the coal tar samples. The weighted activity of the coal tar extracts in Salmonella was 4,960 for sample C, and 162,000 and 206,000 for samples A and B, respectively. The bacterial mutagenicity of 2,4,6-trinitrotoluene contaminated soils exhibited an indirect correlation with chemical-based risk assessment. The aqueous extract of sample 004 induced 1,292 net revertants in Salmonella, while the estimated risk to ingestion and dermal adsorption was 2E-9. The data indicate that the chemical-based risk assessment accurately predicted the genotoxicity of the PAHs, while the accuracy of the risk assessment for munitions contaminated soils was limited due to the presence of metabolites of TNT degradation. The biological tests used in this research provide a valuable compliment to chemical analysis for characterizing the genotoxic risk of complex mixtures

  2. Application of ecological risk assessment principles to evaluation of oil spill impacts

    International Nuclear Information System (INIS)

    Brannon, E.L.; Neff, J.M.; Pearson, W.H.; Stubblefield, W.A.; Maki, A.W.

    1995-01-01

    Ecological risk assessments are often used prospectively to predict the consequences of human activities on the environment. Laboratory and field studies were conducted to evaluate the ecological impacts to commercial fishery resources resulting from the Exxon Valdez oil spill. Using the ecorisk paradigm, each of the studies correlated concentrations of petroleum hydrocarbons in different environmental compartments with observed biological effects in local populations of herring and pink salmon. Hydrocarbon concentrations in the water column of the Sound were elevated for a short time after the spill, but 99.7% of the samples remained below the Alaska water quality standard and returned to background levels within a few months. PAH concentrations in sediments and eggs correlated with a very low degree of injury to early life stages of herring and salmon. Overall, effects of the spill on populations of herring and pink salmon were minimal and post-spill harvests of the year classes at greater risk of spill injury in the two years following the spill were at or near record levels. The program underscores the utility and strength of the risk assessment paradigm to identify contaminant related injury while considering effects attributable to natural ecosystem variability

  3. An integrated framework for health and ecological risk assessment

    International Nuclear Information System (INIS)

    Suter, Glenn W.; Vermeire, Theo; Munns, Wayne R.; Sekizawa, Jun

    2005-01-01

    The worldHealth Organization's (WHO's) International Program for Chemical Safety has developed a framework for performing risk assessments that integrate the assessment of risks to human health and risks to nonhuman organisms and ecosystems. The WHO's framework recognizes that stakeholders and risk managers have their own processes that are parallel to the scientific process of risk assessment and may interact with the risk assessment at various points, depending on the context. Integration of health and ecology provides consistent expressions of assessment results, incorporates the interdependence of humans and the environment, uses sentinel organisms, and improves the efficiency and quality of assessments relative to independent human health and ecological risk assessments. The advantage of the framework to toxicologists lies in the opportunity to use understanding of toxicokinetics and toxicodynamics to inform the integrated assessment of all exposed species

  4. Risk assessment of radiation carcinogenesis

    International Nuclear Information System (INIS)

    Kai, Michiaki

    2012-01-01

    This commentary describes the radiation cancer risk assessed by international organizations other than ICRP, assessed for radon and for internal exposure, in the series from the aspect of radiation protection of explaining the assessments done until ICRP Pub. 103. Statistic significant increase of cancer formation is proved at higher doses than 100-200 mSv. At lower doses, with use of mathematical model, United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR) reported the death probability due to the excess lifetime risk (ELR) at 100 mSv of 0.36-0.77% for solid tumors and 0.03-0.05% for leukemia, and NRC in US, the risk of exposure-induced prevalence and death (REID) per 100 thousands persons of 800 (male)/1,310 (female) and 410/610, respectively. Both are essentially based on findings in A-bomb survivors. The assessment for Rn is described here not on dose. UK and US analyses of pooled raw data in case control studies revealed the significant increase of lung cancer formation at as low level as 100 Bq Rn/m3. Their analyses also showed the significance of smoking, which had been realized as a confounding factor in risk analysis of Rn for uranium miners. The death probability until the age of 85 y was found to be 1.2 x 10 -4 in non-smokers and 24 x 10 -4 in smokers/ Working Level Month (WLM). Increased thyroid cancer incidence has been known in Chernobyl Accident, which is realized as a result of internal exposure of radioiodine; however, the relationship between the internal dose to thyroid and its cancer prevalence resembles that in the case of external exposure. There is no certain evidence against the concept that risk of internal exposure is similar to and/or lower than, the external one although assessment of the internal exposure risk accompanies uncertainty depending on the used model and ingested dose. International Commission on Radiological Protection (ICRP) recommendations hitherto have been important and precious despite

  5. Ethics of Risk. Kristin Shrader-Frechette's Philosophical Critique of Risk Assessment

    International Nuclear Information System (INIS)

    Heikkeroe, Topi

    2006-01-01

    This paper addresses risk assessment from a philosophical point of view. It presents and critically reviews the work of Kristin Shrader-Frechette. It introduces the ethical, epistemological, and methodological issues related to risk assessment. The paper focuses on the ethical questions of justice in risk decisions. It opens by framing the relationship between ethics and technology in the modern world. Then the paper turns to a brief description of risk assessment as a central method in technological decision making. It proceeds to show how Shrader-Frechette analyzes ethical and political aspects of risk assessment. The central argumentation In her critique follows RawIsian lines: distributive and participatory inequalities in creating technological constructions need to be justified. To clarify this requirement she formulates the Principle of Prima Facie Political Equity (PPFPE), which is her central tool in most of her ethical criticism, for instance, in relation to the future generations: prima facie. all generations should be treated equally. Brief critical remarks conclude the paper. They touch upon placing Shrader-Frechette's project on the academic chart and her liberal individualist anthropology

  6. A Tutorial on Probablilistic Risk Assessement and its Role in Risk-Informed Decision Making

    Science.gov (United States)

    Dezfuli, Homayoon

    2010-01-01

    This slide presentation reviews risk assessment and its role in risk-informed decision making. It includes information on probabilistic risk assessment, typical risk management process, origins of risk matrix, performance measures, performance objectives and Bayes theorem.

  7. Using Discrete Choice Experiments to Inform the Benefit-Risk Assessment of Medicines: Are We Ready Yet?

    Science.gov (United States)

    Vass, Caroline M; Payne, Katherine

    2017-09-01

    There is emerging interest in the use of discrete choice experiments as a means of quantifying the perceived balance between benefits and risks (quantitative benefit-risk assessment) of new healthcare interventions, such as medicines, under assessment by regulatory agencies. For stated preference data on benefit-risk assessment to be used in regulatory decision making, the methods to generate these data must be valid, reliable and capable of producing meaningful estimates understood by decision makers. Some reporting guidelines exist for discrete choice experiments, and for related methods such as conjoint analysis. However, existing guidelines focus on reporting standards, are general in focus and do not consider the requirements for using discrete choice experiments specifically for quantifying benefit-risk assessments in the context of regulatory decision making. This opinion piece outlines the current state of play in using discrete choice experiments for benefit-risk assessment and proposes key areas needing to be addressed to demonstrate that discrete choice experiments are an appropriate and valid stated preference elicitation method in this context. Methodological research is required to establish: how robust the results of discrete choice experiments are to formats and methods of risk communication; how information in the discrete choice experiment can be presented effectually to respondents; whose preferences should be elicited; the correct underlying utility function and analytical model; the impact of heterogeneity in preferences; and the generalisability of the results. We believe these methodological issues should be addressed, alongside developing a 'reference case', before agencies can safely and confidently use discrete choice experiments for quantitative benefit-risk assessment in the context of regulatory decision making for new medicines and healthcare products.

  8. Environmental Risk Assessment for a Developing Country like India

    Science.gov (United States)

    Ahmed, Shamsuzzaman; Saha, Indranil

    2017-04-01

    The developing world is facing an increased risk of accelerating disaster losses. A concrete risk assessment along with subsequent management program involving identification, mitigation and preparedness will assist in rehabilitation and reconstruction once the disaster has struck is critical to subvert the magnitude of the loss incurred. A developing country like India has been taken as an example to highlight the elements mentioned. Most countries like India in the developing world is facing a mounting challenge to promote economic growth and bring down poverty. In this scenario, significant climatic changes will not only impact key economic sectors but also add to the existing conundrum. Sudden onset of natural calamities pose an increasing problem to the developing countries for which risk management strategies need to be forged in order to deal with such hazards. If this is not the case, then a substantial diversion of financial resources to reconstruction in the post disaster phase severely messes up the budget planning process. This compromises economic growth in the long run. Envisaging cost effective mitigation measures to minimize environmental and socio economic toll from natural disasters is the immediate requirement. Often it has been found that an apparent lack of historical data on catastrophic events makes hazard assessment an extremely difficult process. For this it is useful to establish preliminary maps to identify high risk zones and justify the utilization of funds. Vulnerability studies assess the physical, social and economic consequences that result from the occurrence of a severe natural phenomenon. Also they take into account public awareness of risk and the consequent ability to cope with such risks. Risk analysis collates information from hazard assessment and vulnerability studies in the form of an estimation of probable future losses in the face of similar hazards. Promoting different governmental schemes to catastrophe risk absorption

  9. Risk assessment and multi-criteria decision-making

    International Nuclear Information System (INIS)

    Segerstaahl, Boris

    1989-01-01

    Risk assessment and analysis is connected to the policy framework used in decision-making on issues concerning technological risk. A review of the problems created by different views concerning the fundamental structure of risk concepts is used as a way to describe the structure of risk assessment studies as used in decision-making. The fundamental difference between judgments based on assessments and on perceptions is analyzed in order to explain the dynamics of the decision making process. A proposed effort to study the energy sector as a dynamic endless game implementing a mixed strategy is suggested. (author)

  10. SPECIAL SECTION: Perspectives of the Scientific Community on the Status of Ecological Risk Assessment

    Science.gov (United States)

    Power; Adams

    1997-11-01

    / Views from a wide variety of practicing environmental professionals on the current status of ecological risk assessment (ERA) indicate consensus and divergence of opinion on the utility and practice of risk assessment. Central to the debate were the issues of whether ERA appropriately incorporates ecological and scientific principle into its conceptual paradigm. Advocates argue that ERA effectively does both, noting that much of the fault detractors find with the process has more to do with its practice than its purpose. Critics argue that failure to validate ERA predictions and the tendency to over-simplify ecological principles compromise the integrity of ERA and may lead to misleading advice on the appropriate responses to environmental problems. All authors felt that many improvements could be made, including validation, better definition of the ecological questions and boundaries of ERA, improved harmonization of selected methods, and improvements in the knowledge base. Despite identified deficiencies, most authors felt that ERA was a useful process undergoing evolutionary changes that will inevitably determine the range of environmental problems to which it can be appropriately applied. The views expressed give ERA a cautious vote of approval and highlight many of the critical strengths and weaknesses in one of our most important environmental assessment tools.KEY WORDS: Ecological risk assessment; Ecology; Probability

  11. Comparative Risk Assessment to Inform Adaptation Priorities for the Natural Environment: Observations from the First UK Climate Change Risk Assessment

    Directory of Open Access Journals (Sweden)

    Iain Brown

    2015-11-01

    Full Text Available Risk assessment can potentially provide an objective framework to synthesise and prioritise climate change risks to inform adaptation policy. However, there are significant challenges in the application of comparative risk assessment procedures to climate change, particularly for the natural environment. These challenges are evaluated with particular reference to the first statutory Climate Change Risk Assessment (CCRA and evidence review procedures used to guide policy for the UK government. More progress was achieved on risk identification, screening and prioritisation compared to risk quantification. This was due to the inherent complexity and interdependence of ecological risks and their interaction with socio-economic drivers as well as a climate change. Robust strategies to manage risk were identified as those that coordinate organisational resources to enhance ecosystem resilience, and to accommodate inevitable change, rather than to meet specific species or habitats targets. The assessment also highlighted subjective and contextual components of risk appraisal including ethical issues regarding the level of human intervention in the natural environment and the proposed outcomes of any intervention. This suggests that goals for risk assessment need to be more clearly explicated and assumptions on tolerable risk declared as a primer for further dialogue on expectations for managed outcomes. Ecosystem-based adaptation may mean that traditional habitats and species conservation goals and existing regulatory frameworks no longer provide the best guide for long-term risk management thereby challenging the viability of some existing practices.

  12. Assessment of health risks of policies

    International Nuclear Information System (INIS)

    Ádám, Balázs; Molnár, Ágnes; Ádány, Róza; Bianchi, Fabrizio; Bitenc, Katarina; Chereches, Razvan; Cori, Liliana; Fehr, Rainer; Kobza, Joanna; Kollarova, Jana

    2014-01-01

    The assessment of health risks of policies is an inevitable, although challenging prerequisite for the inclusion of health considerations in political decision making. The aim of our project was to develop a so far missing methodological guide for the assessment of the complex impact structure of policies. The guide was developed in a consensual way based on experiences gathered during the assessment of specific national policies selected by the partners of an EU project. Methodological considerations were discussed and summarized in workshops and pilot tested on the EU Health Strategy for finalization. The combined tool, which includes a textual guidance and a checklist, follows the top-down approach, that is, it guides the analysis of causal chains from the policy through related health determinants and risk factors to health outcomes. The tool discusses the most important practical issues of assessment by impact level. It emphasises the transparent identification and prioritisation of factors, the consideration of the feasibility of exposure and outcome assessment with special focus on quantification. The developed guide provides useful methodological instructions for the comprehensive assessment of health risks of policies that can be effectively used in the health impact assessment of policy proposals. - Highlights: • Methodological guide for the assessment of health risks of policies is introduced. • The tool is developed based on the experiences from several case studies. • The combined tool consists of a textual guidance and a checklist. • The top-down approach is followed through the levels of the full impact chain. • The guide provides assistance for the health impact assessment of policy proposals

  13. Assessment of health risks of policies

    Energy Technology Data Exchange (ETDEWEB)

    Ádám, Balázs, E-mail: badam@cmss.sdu.dk [Unit for Health Promotion Research, Faculty of Health Sciences, University of Southern Denmark, Niels Bohrs Vej 9, DK-6700 Esbjerg (Denmark); Department of Preventive Medicine, Faculty of Public Health, University of Debrecen, P.O. Box 9, H-4012 Debrecen (Hungary); Molnár, Ágnes, E-mail: MolnarAg@smh.ca [Department of Preventive Medicine, Faculty of Public Health, University of Debrecen, P.O. Box 9, H-4012 Debrecen (Hungary); Centre for Research on Inner City Health, Keenan Research Centre, Li Ka Shing Knowledge Institute, St Michael' s Hospital, Victoria 209, Rm. 3-26.22, M5B 1C6 Toronto, Ontario (Canada); Ádány, Róza, E-mail: adany.roza@sph.unideb.hu [Department of Preventive Medicine, Faculty of Public Health, University of Debrecen, P.O. Box 9, H-4012 Debrecen (Hungary); Bianchi, Fabrizio, E-mail: Fabriepi@ifc.cnr.it [Unit of Environmental Epidemiology, Institute of Clinical Physiology, National Council of Research, Moruzzi 1, 56124 Pisa (Italy); Bitenc, Katarina, E-mail: katarina.bitenc@ivz-rs.si [National Institute of Public Health, Trubarjeva 2, SI-1000 Ljubljana (Slovenia); Chereches, Razvan, E-mail: razvan.m.chereches@gmail.com [Faculty of Political, Administrative and Communication Sciences, Babes-Bolyai University, Strada Mihail Kogalniceanu 1, 3400 Cluj (Romania); Cori, Liliana, E-mail: liliana.cori@ifc.cnr.it [Unit of Environmental Epidemiology, Institute of Clinical Physiology, National Council of Research, Moruzzi 1, 56124 Pisa (Italy); Fehr, Rainer, E-mail: rainer.fehr@uni-bielefeld.de [NRW Centre for Health, Westerfeldstr. 35-37, 33611 Bielefeld (Germany); Kobza, Joanna, E-mail: koga1@poczta.onet.pl [Public Health Department, Silesian Medical University, 18 Medykow Street, 40-752 Katowice (Poland); Kollarova, Jana, E-mail: janakollarova@yahoo.com [Department of Health Promotion, Regional Public Health Authority, Ipelska 1, 04011 Kosice (Slovakia); and others

    2014-09-15

    The assessment of health risks of policies is an inevitable, although challenging prerequisite for the inclusion of health considerations in political decision making. The aim of our project was to develop a so far missing methodological guide for the assessment of the complex impact structure of policies. The guide was developed in a consensual way based on experiences gathered during the assessment of specific national policies selected by the partners of an EU project. Methodological considerations were discussed and summarized in workshops and pilot tested on the EU Health Strategy for finalization. The combined tool, which includes a textual guidance and a checklist, follows the top-down approach, that is, it guides the analysis of causal chains from the policy through related health determinants and risk factors to health outcomes. The tool discusses the most important practical issues of assessment by impact level. It emphasises the transparent identification and prioritisation of factors, the consideration of the feasibility of exposure and outcome assessment with special focus on quantification. The developed guide provides useful methodological instructions for the comprehensive assessment of health risks of policies that can be effectively used in the health impact assessment of policy proposals. - Highlights: • Methodological guide for the assessment of health risks of policies is introduced. • The tool is developed based on the experiences from several case studies. • The combined tool consists of a textual guidance and a checklist. • The top-down approach is followed through the levels of the full impact chain. • The guide provides assistance for the health impact assessment of policy proposals.

  14. Assessing and managing multiple risks in a changing world ...

    Science.gov (United States)

    Roskilde University (Denmark) hosted a November 2015 workshop, Environmental Risk—Assessing and Managing Multiple Risks in a Changing World. This Focus article presents the consensus recommendations of 30 attendees from 9 countries regarding implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process; dealing with societal issues; risk-management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. The authors encourage both cross-disciplinary and interdisciplinary approaches to address their 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and nonchemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk-assessment process; 4) fully integrate risk assessors and communities of interest into the risk-management process; 5) consider socioeconomics and increased transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference conditions and the proper ecological c

  15. Risk assessment and risk management in managed aquifer recharge

    CSIR Research Space (South Africa)

    Page, D

    2012-06-01

    Full Text Available This chapter presents the methodologies used for risk assessment and risk management in MAR in Australia and the European Union, qualitative and quantitative approaches adopted within the RECLAIM Water project and case studies where the outcomes...

  16. Neurobiological studies of risk assessment: A comparison of expected utility and mean-variance approaches

    OpenAIRE

    d'Acremont, M.; Bossaerts, Peter

    2008-01-01

    When modeling valuation under uncertainty, economists generally prefer expected utility because it has an axiomatic foundation, meaning that the resulting choices will satisfy a number of rationality requirements. In expected utility theory, values are computed by multiplying probabilities of each possible state of nature by the payoff in that state and summing the results. The drawback of this approach is that all state probabilities need to be dealt with separately, which becomes extremely ...

  17. Assessment and improvement of radiation oncology trainee contouring ability utilizing consensus-based penalty metrics

    International Nuclear Information System (INIS)

    Hallock, Abhirami; Read, Nancy; D'Souza, David

    2012-01-01

    The objective of this study was to develop and assess the feasibility of utilizing consensus-based penalty metrics for the purpose of critical structure and organ at risk (OAR) contouring quality assurance and improvement. A Delphi study was conducted to obtain consensus on contouring penalty metrics to assess trainee-generated OAR contours. Voxel-based penalty metric equations were used to score regions of discordance between trainee and expert contour sets. The utility of these penalty metric scores for objective feedback on contouring quality was assessed by using cases prepared for weekly radiation oncology radiation oncology trainee treatment planning rounds. In two Delphi rounds, six radiation oncology specialists reached agreement on clinical importance/impact and organ radiosensitivity as the two primary criteria for the creation of the Critical Structure Inter-comparison of Segmentation (CriSIS) penalty functions. Linear/quadratic penalty scoring functions (for over- and under-contouring) with one of four levels of severity (none, low, moderate and high) were assigned for each of 20 OARs in order to generate a CriSIS score when new OAR contours are compared with reference/expert standards. Six cases (central nervous system, head and neck, gastrointestinal, genitourinary, gynaecological and thoracic) then were used to validate 18 OAR metrics through comparison of trainee and expert contour sets using the consensus derived CriSIS functions. For 14 OARs, there was an improvement in CriSIS score post-educational intervention. The use of consensus-based contouring penalty metrics to provide quantitative information for contouring improvement is feasible.

  18. Near-Port Air Quality Assessment Utilizing a Mobile Monitoring Approach

    Data.gov (United States)

    U.S. Environmental Protection Agency — Near-Port Air Quality Assessment Utilizing a Mobile Monitoring Approach. This dataset is associated with the following publication: Steffens, J., S. Kimbrough, R....

  19. assessing the utilization of personnel in the management of ...

    African Journals Online (AJOL)

    LUCY

    MANAGEMENT OF TECHNICAL EDUCATION IN AKWA IBOM. STATE, NIGERIA. ALOYSIUS O. UMOSEN. (Received 19, April 2011; Revision Accepted 16, June 2011). ABSTRACT. The study assesses the utilization of technical teachers in Akwa Ibom State technical colleges. The study design was ex-post facto.

  20. Risks associated with antiretroviral treatment for human immunodeficiency virus (HIV): qualitative analysis of social media data and health state utility valuation.

    Science.gov (United States)

    Matza, Louis S; Chung, Karen C; Kim, Katherine J; Paulus, Trena M; Davies, Evan W; Stewart, Katie D; McComsey, Grace A; Fordyce, Marshall W

    2017-07-01

    Despite benefits of antiretroviral therapies (ART), people with HIV infection have increased risk of cardiovascular disease, kidney disease, and low bone mineral density. Some ARTs increase risk of these events. The purpose of this study was to examine patients' perspectives of these risks and estimate health state utilities associated with these risks for use in cost-utility models. Qualitative thematic analysis was conducted to examine messages posted to the POZ/AIDSmeds Internet community forums, focusing on bone, kidney, and cardiovascular side effects and risks of HIV/AIDS medications. Then, health state vignettes were drafted based on this qualitative analysis, literature review, and clinician interviews. The health states (representing HIV, plus treatment-related risks) were valued in time trade-off interviews with general population participants in the UK. Qualitative analysis of the Internet forums documented patient concerns about ART risks, as well as treatment decisions made because of these risks. A total of 208 participants completed utility interviews (51.4% female; mean age 44.6 years). The mean utility of the HIV health state (virologically suppressed, treated with ART) was 0.86. Adding a description of risk resulted in statistically significant disutility (i.e., utility decreases): renal risk (disutility = -0.02), bone risk (-0.03), and myocardial infarction risk (-0.05). Patient concerns and treatment decisions were documented via qualitative analysis of Internet forum discussions, and the impact of these concerns was quantified in terms of health state utilities. The resulting disutilities may be useful for differentiating among ARTs in economic modeling of treatment for patients with HIV.

  1. Cloud computing assessing the risks

    CERN Document Server

    Carstensen, Jared; Golden, Bernard

    2012-01-01

    Cloud Computing: Assessing the risks answers these questions and many more. Using jargon-free language and relevant examples, analogies and diagrams, it is an up-to-date, clear and comprehensive guide the security, governance, risk, and compliance elements of Cloud Computing.

  2. Quantified risk assessment - a nuclear industry viewpoint

    International Nuclear Information System (INIS)

    Thomson, J.R.

    1994-01-01

    This paper presents a brief summary of the methodology used for the assessment of risk arising from fuel handling and dismantling operations in advanced gas-cooled reactor power stations. The difficulties with and problems arising from such risk assessments are discussed. In particular, difficulties arise from (i) the onerous risk criteria that nuclear plants are expected to satisfy, (ii) the necessary complexity of the plant, (iii) the conflicting requirements for the fault consequence assessments to be bounding but not grossly pessimistic, and (iv) areas of fault frequency assessment which contain possibly subjective considerations such as software and common mode failure. (author)

  3. SPECIFIC METHOD OF RISK ASSESSMENT IN TOURISM ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Andreea ARMEAN

    2014-12-01

    Full Text Available The objective of this paper is to present an innovative method of risk assessment for tourism businesses. The contribution to literature is the novelty of this method of following paths: is an ante-factum assessment not post-factum; risk assessment is based on perception rather than results; is based on specific risks tourism enterprises not on the overall risks. Is an asset-research methodology and consists in generating its own method of risk assessment based on the ideas summarized from the literature studied. The aim established is tourism enterprises from Romania. The data necessary for the application of this method will result from applying to top level management of tourism enterprises, a questionnaire about risk perception. The results from this study will help identify and measure the risks specific to tourism enterprises. The applicability of the results is to improve risk management in these enterprises.

  4. New approaches for improving cardiovascular risk assessment.

    Science.gov (United States)

    Paredes, Simão; Rocha, Teresa; Mendes, Diana; Carvalho, Paulo; Henriques, Jorge; Morais, João; Ferreira, Jorge; Mendes, Miguel

    2016-01-01

    Clinical guidelines recommend the use of cardiovascular risk assessment tools (risk scores) to predict the risk of events such as cardiovascular death, since these scores can aid clinical decision-making and thereby reduce the social and economic costs of cardiovascular disease (CVD). However, despite their importance, risk scores present important weaknesses that can diminish their reliability in clinical contexts. This study presents a new framework, based on current risk assessment tools, that aims to minimize these limitations. Appropriate application and combination of existing knowledge is the main focus of this work. Two different methodologies are applied: (i) a combination scheme that enables data to be extracted and processed from various sources of information, including current risk assessment tools and the contributions of the physician; and (ii) a personalization scheme based on the creation of patient groups with the purpose of identifying the most suitable risk assessment tool to assess the risk of a specific patient. Validation was performed based on a real patient dataset of 460 patients at Santa Cruz Hospital, Lisbon, Portugal, diagnosed with non-ST-segment elevation acute coronary syndrome. Promising results were obtained with both approaches, which achieved sensitivity, specificity and geometric mean of 78.79%, 73.07% and 75.87%, and 75.69%, 69.79% and 72.71%, respectively. The proposed approaches present better performances than current CVD risk scores; however, additional datasets are required to back up these findings. Copyright © 2015 Sociedade Portuguesa de Cardiologia. Published by Elsevier España. All rights reserved.

  5. System for Capturing/Storage/Retrieval/Sharing of Toxicological Information Required for Rapid Assessment of Risks Posed By Release of CBRN Materials in the Environment

    International Nuclear Information System (INIS)

    Taylor, M. L.; Ritondo, M.; Earp Singer, L.; Rogers, J. V.; Price, J. A.; Fleming, E. J.; Chappie, D.; McGonigle, D.; Nichols, T. L.; Sonich-Mullin, C.

    2007-01-01

    The Threat and Consequence Assessment Division (TCAD) of the U.S. Environmental Protection Agency's (EPA) National Homeland Security Research Center (NHSRC) is developing methodology for performing rapid risk assessments needed for incident management, cleanup, and mitigation of hazards in the aftermath of a terrorist event. TCAD, working with the Department of Defense's Chemical and Biological Defense Information Analysis Center (CBIAC, operated by Battelle) has developed SERRA - Support for Environmental Rapid Risk Assessment. This paper describes the methodology utilized to formulate SERRA, presents current contents of the SERRA database (information derived from assessments of over 3,000 publications selected from 10,000 citations), and describes SERRA implementation. The paper also discusses how an Internet-accessible version of the SERRA database could be utilized by a country or countries to prepare for and respond to the intentional release of chemical, biological or radiological materials.(author)

  6. Probabilistic Risk Assessment for Decision Making During Spacecraft Operations

    Science.gov (United States)

    Meshkat, Leila

    2009-01-01

    Decisions made during the operational phase of a space mission often have significant and immediate consequences. Without the explicit consideration of the risks involved and their representation in a solid model, it is very likely that these risks are not considered systematically in trade studies. Wrong decisions during the operational phase of a space mission can lead to immediate system failure whereas correct decisions can help recover the system even from faulty conditions. A problem of special interest is the determination of the system fault protection strategies upon the occurrence of faults within the system. Decisions regarding the fault protection strategy also heavily rely on a correct understanding of the state of the system and an integrated risk model that represents the various possible scenarios and their respective likelihoods. Probabilistic Risk Assessment (PRA) modeling is applicable to the full lifecycle of a space mission project, from concept development to preliminary design, detailed design, development and operations. The benefits and utilities of the model, however, depend on the phase of the mission for which it is used. This is because of the difference in the key strategic decisions that support each mission phase. The focus of this paper is on describing the particular methods used for PRA modeling during the operational phase of a spacecraft by gleaning insight from recently conducted case studies on two operational Mars orbiters. During operations, the key decisions relate to the commands sent to the spacecraft for any kind of diagnostics, anomaly resolution, trajectory changes, or planning. Often, faults and failures occur in the parts of the spacecraft but are contained or mitigated before they can cause serious damage. The failure behavior of the system during operations provides valuable data for updating and adjusting the related PRA models that are built primarily based on historical failure data. The PRA models, in turn

  7. Can we (actually) assess global risk?

    Science.gov (United States)

    Di Baldassarre, Giuliano

    2013-04-01

    The evaluation of the dynamic interactions of the different components of global risk (e.g. hazard, exposure, vulnerability or resilience) is one of the main challenges in risk assessment and management. In state-of-the-art approaches for the analysis of risk, natural and socio-economic systems are typically treated separately by using different methods. In flood risk studies, for instance, physical scientists typically focus on the study of the probability of flooding (i.e. hazard), while social scientists mainly examine the exposure, vulnerability or resilience to flooding. However, these different components are deeply interconnected. Changes in flood hazard might trigger changes in vulnerability, and vice versa. A typical example of these interactions is the so-called "levee effect", whereby heightening levees to reduce the probability of flooding often leads to increase the potential adverse consequences of flooding as people often perceive that flood risk was completely eliminated once the levee was raised. These interconnections between the different components of risk remain largely unexplored and poorly understood. This lack of knowledge is of serious concern as it limits our ability to plan appropriate risk prevention measures. To design flood control structures, for example, state-of-the-art models can indeed provide quantitative assessments of the corresponding risk reduction associated to the lower probability of flooding. Nevertheless, current methods cannot estimate how, and to what extent, such a reduction might trigger a future increase of the potential adverse consequences of flooding (the aforementioned "levee effect"). Neither can they evaluate how the latter might (in turn) lead to the requirement of additional flood control structures. Thus, while many progresses have been made in the static assessment of flood risk, more inter-disciplinary research is required for the development of methods for dynamic risk assessment, which is very much

  8. Operationalization Of The Professional Risks Assessment Activity

    Science.gov (United States)

    Ivascu, Victoria Larisa; Cirjaliu, Bianca; Draghici, Anca

    2015-07-01

    Professional risks assessment approach (integration of analysis and evaluation processes) is linked with the general concerns of nowadays companies for their employees' health and safety assurances, in the context of organizations sustainable development. The paper presents an approach for the operationalization of the professional risk assessment activity in companies through the implementation and use of the OnRisk platform (this have been tested in some industrial companies). The short presentation of the relevant technical reports and statistics on OSH management at the European Union level underlines the need for the development of a professional risks assessment. Finally, there have been described the designed and developed OnRisk platform as a web platform together with some case studies that have validate the created tool.

  9. Methodology for technical risk assessment

    International Nuclear Information System (INIS)

    Waganer, L.M.; Zuckerman, D.S.

    1983-01-01

    A methodology has been developed for and applied to the assessment of the technical risks associated with an evolving technology. This methodology, originally developed for fusion by K. W. Billman and F. R. Scott at EPRI, has been applied to assess the technical risk of a fuel system for a fusion reactor. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications (i.e. probability of failure). The individual steps in the technical risk assessment are summarized. The first step in this methodology is to clearly and completely quantify the technical requirements for the particular system being examined. The next step is to identify and define subsystems and various options which appear capable of achieving the required technical performance. The subsystem options are then characterized regarding subsystem functions, interface requirements with the subsystems and systems, important components, developmental obstacles and technical limitations. Key technical subsystem performance parameters are identified which directly or indirectly relate to the system technical specifications. Past, existing and future technical performance data from subsystem experts are obtained by using a Bayesian Interrogation technique. The input data is solicited in the form of probability functions. Thus the output performance of the system is expressed as probability functions

  10. Overcoming barriers to integrating economic analysis into risk assessment.

    Science.gov (United States)

    Hoffmann, Sandra

    2011-09-01

    Regulatory risk analysis is designed to provide decisionmakers with a clearer understanding of how policies are likely to affect risk. The systems that produce risk are biological, physical, and social and economic. As a result, risk analysis is an inherently interdisciplinary task. Yet in practice, risk analysis has been interdisciplinary in only limited ways. Risk analysis could provide more accurate assessments of risk if there were better integration of economics and other social sciences into risk assessment itself. This essay examines how discussions about risk analysis policy have influenced the roles of various disciplines in risk analysis. It explores ways in which integrated bio/physical-economic modeling could contribute to more accurate assessments of risk. It reviews examples of the kind of integrated economics-bio/physical modeling that could be used to enhance risk assessment. The essay ends with a discussion of institutional barriers to greater integration of economic modeling into risk assessment and provides suggestions on how these might be overcome. © 2011 Society for Risk Analysis.

  11. Regional scale ecological risk assessment: using the relative risk model

    National Research Council Canada - National Science Library

    Landis, Wayne G

    2005-01-01

    ...) in the performance of regional-scale ecological risk assessments. The initial chapters present the methodology and the critical nature of the interaction between risk assessors and decision makers...

  12. Assessment of utilization of maternal health care provisions in ...

    African Journals Online (AJOL)

    Assessment of utilization of maternal health care provisions in Orumba North Local Government Area of Anambra State, Nigeria. ... care facilities (52%). This study therefore, recommends equipping modern health care facilities with both human and material resources to enhance their performance. Also, periodic training of ...

  13. Risk assessment future cash flows

    OpenAIRE

    Chachina H. G.

    2012-01-01

    This article is about risk assessment in planning future cash flows. Discount rate in DCF-model must include four factors: risk cash flow, inflation, value of investments, turnover assets. This has an influence net present value cash flow and make his incomparable.

  14. Improving pandemic influenza risk assessment

    Science.gov (United States)

    Assessing the pandemic risk posed by specific non-human influenza A viruses remains a complex challenge. As influenza virus genome sequencing becomes cheaper, faster and more readily available, the ability to predict pandemic potential from sequence data could transform pandemic influenza risk asses...

  15. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  16. 76 FR 44891 - Monsanto Co.; Availability of Petition, Plant Pest Risk Assessment, and Environmental Assessment...

    Science.gov (United States)

    2011-07-27

    ...] Monsanto Co.; Availability of Petition, Plant Pest Risk Assessment, and Environmental Assessment for... Monsanto petition, our plant pest risk assessment, and our draft environmental assessment for the proposed...-2817 before coming. The petition, draft environmental assessment, and plant pest risk assessment are...

  17. The Next Generation of Risk Assessment Multi-Year Study—Highlights of Findings, Applications to Risk Assessment, and Future Directions

    Science.gov (United States)

    Cote, Ila; Andersen, Melvin E.; Ankley, Gerald T.; Barone, Stanley; Birnbaum, Linda S.; Boekelheide, Kim; Bois, Frederic Y.; Burgoon, Lyle D.; Chiu, Weihsueh A.; Crawford-Brown, Douglas; Crofton, Kevin M.; DeVito, Michael; Devlin, Robert B.; Edwards, Stephen W.; Guyton, Kathryn Z.; Hattis, Dale; Judson, Richard S.; Knight, Derek; Krewski, Daniel; Lambert, Jason; Maull, Elizabeth Anne; Mendrick, Donna; Paoli, Gregory M.; Patel, Chirag Jagdish; Perkins, Edward J.; Poje, Gerald; Portier, Christopher J.; Rusyn, Ivan; Schulte, Paul A.; Simeonov, Anton; Smith, Martyn T.; Thayer, Kristina A.; Thomas, Russell S.; Thomas, Reuben; Tice, Raymond R.; Vandenberg, John J.; Villeneuve, Daniel L.; Wesselkamper, Scott; Whelan, Maurice; Whittaker, Christine; White, Ronald; Xia, Menghang; Yauk, Carole; Zeise, Lauren; Zhao, Jay; DeWoskin, Robert S.

    2016-01-01

    Background: The Next Generation (NexGen) of Risk Assessment effort is a multi-year collaboration among several organizations evaluating new, potentially more efficient molecular, computational, and systems biology approaches to risk assessment. This article summarizes our findings, suggests applications to risk assessment, and identifies strategic research directions. Objective: Our specific objectives were to test whether advanced biological data and methods could better inform our understanding of public health risks posed by environmental exposures. Methods: New data and methods were applied and evaluated for use in hazard identification and dose–response assessment. Biomarkers of exposure and effect, and risk characterization were also examined. Consideration was given to various decision contexts with increasing regulatory and public health impacts. Data types included transcriptomics, genomics, and proteomics. Methods included molecular epidemiology and clinical studies, bioinformatic knowledge mining, pathway and network analyses, short-duration in vivo and in vitro bioassays, and quantitative structure activity relationship modeling. Discussion: NexGen has advanced our ability to apply new science by more rapidly identifying chemicals and exposures of potential concern, helping characterize mechanisms of action that influence conclusions about causality, exposure–response relationships, susceptibility and cumulative risk, and by elucidating new biomarkers of exposure and effects. Additionally, NexGen has fostered extensive discussion among risk scientists and managers and improved confidence in interpreting and applying new data streams. Conclusions: While considerable uncertainties remain, thoughtful application of new knowledge to risk assessment appears reasonable for augmenting major scope assessments, forming the basis for or augmenting limited scope assessments, and for prioritization and screening of very data limited chemicals. Citation: Cote I

  18. Risk assessment under deep uncertainty: A methodological comparison

    International Nuclear Information System (INIS)

    Shortridge, Julie; Aven, Terje; Guikema, Seth

    2017-01-01

    Probabilistic Risk Assessment (PRA) has proven to be an invaluable tool for evaluating risks in complex engineered systems. However, there is increasing concern that PRA may not be adequate in situations with little underlying knowledge to support probabilistic representation of uncertainties. As analysts and policy makers turn their attention to deeply uncertain hazards such as climate change, a number of alternatives to traditional PRA have been proposed. This paper systematically compares three diverse approaches for risk analysis under deep uncertainty (qualitative uncertainty factors, probability bounds, and robust decision making) in terms of their representation of uncertain quantities, analytical output, and implications for risk management. A simple example problem is used to highlight differences in the way that each method relates to the traditional risk assessment process and fundamental issues associated with risk assessment and description. We find that the implications for decision making are not necessarily consistent between approaches, and that differences in the representation of uncertain quantities and analytical output suggest contexts in which each method may be most appropriate. Finally, each methodology demonstrates how risk assessment can inform decision making in deeply uncertain contexts, informing more effective responses to risk problems characterized by deep uncertainty. - Highlights: • We compare three diverse approaches to risk assessment under deep uncertainty. • A simple example problem highlights differences in analytical process and results. • Results demonstrate how methodological choices can impact risk assessment results.

  19. Participatory Risk Assessment for Environmental Decision-Making

    International Nuclear Information System (INIS)

    Homan, Jacqueline; Petts, Judith

    2001-01-01

    Recent research, discussion and practice in the role environmental decision-making as an integral part of a democratic society have resulted in legislation, policy and guidance that encourage, and indeed may require, greater participation. The focus of this research paper is to explore these participatory ideas in the context of environmental risk assessment. Participation methods have generic application. However, the importance of fitting method to purpose requires that different contexts and issues relative to the objectives be addressed. In relation to environmental risk assessment these issues include: the complexity of risk issues per se; the inherent uncertainty that dominates any risk assessment; the quantitative nature of many risk assessments and the difficulty of dealing with low probability-high consequence outconies; the possibility of controversy in relation to decisions involving risk and thus the careful attention needed to the process and identification of participants; the traditional role and culture of experts in risk decisions and the challenge of reconciling this with the role of lay knowledge and the potential for the public to act as quality assurers in the risk decision process; the tendency for people to need reassurance when confronted with risk, even during a participation process; the need to acknowledge the public's ability to deal with complex technical issues and the need for information and data to respond to their questions, and the fact that 'risk' per se will often not be the only issue of public concern. The contributions to the risk debate from the social sciences are having considerable influence on the practice of environmental decision-making. Calls for increased stakeholder involvement in risk decisions are requiring greater access to and engagement with environmental risk assessments. Mechanisms for this level of involvement, however, are not well defined. For these aspirational calls to be realised in practice, decision

  20. Participatory Risk Assessment for Environmental Decision-Making

    Energy Technology Data Exchange (ETDEWEB)

    Homan, Jacqueline; Petts, Judith [Univ. of Birmingham (United Kingdom). Centre for Environmental Research and Training; Pollard, Simon; Twigger-Ross, Clare [National Centre for Risk Analysis and Options Appraisal, London (United Kingdom)

    2001-07-01

    Recent research, discussion and practice in the role environmental decision-making as an integral part of a democratic society have resulted in legislation, policy and guidance that encourage, and indeed may require, greater participation. The focus of this research paper is to explore these participatory ideas in the context of environmental risk assessment. Participation methods have generic application. However, the importance of fitting method to purpose requires that different contexts and issues relative to the objectives be addressed. In relation to environmental risk assessment these issues include: the complexity of risk issues per se; the inherent uncertainty that dominates any risk assessment; the quantitative nature of many risk assessments and the difficulty of dealing with low probability-high consequence outconies; the possibility of controversy in relation to decisions involving risk and thus the careful attention needed to the process and identification of participants; the traditional role and culture of experts in risk decisions and the challenge of reconciling this with the role of lay knowledge and the potential for the public to act as quality assurers in the risk decision process; the tendency for people to need reassurance when confronted with risk, even during a participation process; the need to acknowledge the public's ability to deal with complex technical issues and the need for information and data to respond to their questions, and the fact that 'risk' per se will often not be the only issue of public concern. The contributions to the risk debate from the social sciences are having considerable influence on the practice of environmental decision-making. Calls for increased stakeholder involvement in risk decisions are requiring greater access to and engagement with environmental risk assessments. Mechanisms for this level of involvement, however, are not well defined. For these aspirational calls to be realised in

  1. Advances in risk assessment for climate change adaptation policy

    Science.gov (United States)

    Adger, W. Neil; Brown, Iain; Surminski, Swenja

    2018-01-01

    Climate change risk assessment involves formal analysis of the consequences, likelihoods and responses to the impacts of climate change and the options for addressing these under societal constraints. Conventional approaches to risk assessment are challenged by the significant temporal and spatial dynamics of climate change; by the amplification of risks through societal preferences and values; and through the interaction of multiple risk factors. This paper introduces the theme issue by reviewing the current practice and frontiers of climate change risk assessment, with specific emphasis on the development of adaptation policy that aims to manage those risks. These frontiers include integrated assessments, dealing with climate risks across borders and scales, addressing systemic risks, and innovative co-production methods to prioritize solutions to climate challenges with decision-makers. By reviewing recent developments in the use of large-scale risk assessment for adaptation policy-making, we suggest a forward-looking research agenda to meet ongoing strategic policy requirements in local, national and international contexts. This article is part of the theme issue ‘Advances in risk assessment for climate change adaptation policy’. PMID:29712800

  2. Advances in risk assessment for climate change adaptation policy.

    Science.gov (United States)

    Adger, W Neil; Brown, Iain; Surminski, Swenja

    2018-06-13

    Climate change risk assessment involves formal analysis of the consequences, likelihoods and responses to the impacts of climate change and the options for addressing these under societal constraints. Conventional approaches to risk assessment are challenged by the significant temporal and spatial dynamics of climate change; by the amplification of risks through societal preferences and values; and through the interaction of multiple risk factors. This paper introduces the theme issue by reviewing the current practice and frontiers of climate change risk assessment, with specific emphasis on the development of adaptation policy that aims to manage those risks. These frontiers include integrated assessments, dealing with climate risks across borders and scales, addressing systemic risks, and innovative co-production methods to prioritize solutions to climate challenges with decision-makers. By reviewing recent developments in the use of large-scale risk assessment for adaptation policy-making, we suggest a forward-looking research agenda to meet ongoing strategic policy requirements in local, national and international contexts.This article is part of the theme issue 'Advances in risk assessment for climate change adaptation policy'. © 2018 The Author(s).

  3. Advances in risk assessment for climate change adaptation policy

    Science.gov (United States)

    Adger, W. Neil; Brown, Iain; Surminski, Swenja

    2018-06-01

    Climate change risk assessment involves formal analysis of the consequences, likelihoods and responses to the impacts of climate change and the options for addressing these under societal constraints. Conventional approaches to risk assessment are challenged by the significant temporal and spatial dynamics of climate change; by the amplification of risks through societal preferences and values; and through the interaction of multiple risk factors. This paper introduces the theme issue by reviewing the current practice and frontiers of climate change risk assessment, with specific emphasis on the development of adaptation policy that aims to manage those risks. These frontiers include integrated assessments, dealing with climate risks across borders and scales, addressing systemic risks, and innovative co-production methods to prioritize solutions to climate challenges with decision-makers. By reviewing recent developments in the use of large-scale risk assessment for adaptation policy-making, we suggest a forward-looking research agenda to meet ongoing strategic policy requirements in local, national and international contexts. This article is part of the theme issue `Advances in risk assessment for climate change adaptation policy'.

  4. General approaches to the risk assessment of chemicals

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, Patrick [Commission of the European Communities, Directorate General XI, Environment, Nuclear Safety and Civil Protection (Belgium)

    1992-07-01

    In the context of the UNCED 92 'Earth Summit' in Rio, the following definition of chemical risk assessment has been developed: 'Chemical risk assessment is a scientific process that identifies and quantifies the potential adverse effects on human health or ecosystems of defined exposures to chemical substances, to mixtures that include chemicals, or to chemically hazardous processes or situations. Risk itself is the probability of the occurrence of a defined adverse effect in a defined group and in defined circumstances'. I would not be so impertinent as to try and improve upon a definition that has the tacit endorsement of the majority of world-leaders. Furthermore, I consider that too many man-years have been spent discussing this topic. Thankfully the UNCED definition recognises chemical risk assessment as being a process and not some immutable physical law. In this presentation I will attempt to explain some of the details and mechanisms of that process but first of all it is worthwhile to spend a few moments putting chemical risk assessment in its proper context and asking the simple question: why do we want/need to assess the potential risk of chemicals?. In general terms, chemicals risk assessment is carried out in order to ensure that neither man (consumer/worker/general public) nor the environment are exposed to unacceptable risks arising from the production, use and disposal of chemicals. At a national and/or international level, risk assessments are performed by the regulatory authorities before they accept notification dossiers (e.g. new industrial chemicals) or grant authorizations (e.g. pharmaceuticals, pesticides, cosmetics, food additives). At the local level, plant-operators must carry out risk assessments to ensure that in the particular circumstances of their factory the workers are adequately protected and that satisfactory accident prevention and contingency plans are prepared. Similarly, local authorities must carry out risk assessments before

  5. General approaches to the risk assessment of chemicals

    International Nuclear Information System (INIS)

    Murphy, Patrick

    1992-01-01

    In the context of the UNCED 92 'Earth Summit' in Rio, the following definition of chemical risk assessment has been developed: 'Chemical risk assessment is a scientific process that identifies and quantifies the potential adverse effects on human health or ecosystems of defined exposures to chemical substances, to mixtures that include chemicals, or to chemically hazardous processes or situations. Risk itself is the probability of the occurrence of a defined adverse effect in a defined group and in defined circumstances'. I would not be so impertinent as to try and improve upon a definition that has the tacit endorsement of the majority of world-leaders. Furthermore, I consider that too many man-years have been spent discussing this topic. Thankfully the UNCED definition recognises chemical risk assessment as being a process and not some immutable physical law. In this presentation I will attempt to explain some of the details and mechanisms of that process but first of all it is worthwhile to spend a few moments putting chemical risk assessment in its proper context and asking the simple question: why do we want/need to assess the potential risk of chemicals?. In general terms, chemicals risk assessment is carried out in order to ensure that neither man (consumer/worker/general public) nor the environment are exposed to unacceptable risks arising from the production, use and disposal of chemicals. At a national and/or international level, risk assessments are performed by the regulatory authorities before they accept notification dossiers (e.g. new industrial chemicals) or grant authorizations (e.g. pharmaceuticals, pesticides, cosmetics, food additives). At the local level, plant-operators must carry out risk assessments to ensure that in the particular circumstances of their factory the workers are adequately protected and that satisfactory accident prevention and contingency plans are prepared. Similarly, local authorities must carry out risk assessments before

  6. A Guide to the Application of Probability Risk Assessment Methodology and Hazard Risk Frequency Criteria as a Hazard Control for the Use of the Mobile Servicing System on the International Space Station

    Science.gov (United States)

    D'silva, Oneil; Kerrison, Roger

    2013-09-01

    A key feature for the increased utilization of space robotics is to automate Extra-Vehicular manned space activities and thus significantly reduce the potential for catastrophic hazards while simultaneously minimizing the overall costs associated with manned space. The principal scope of the paper is to evaluate the use of industry standard accepted Probability risk/safety assessment (PRA/PSA) methodologies and Hazard Risk frequency Criteria as a hazard control. This paper illustrates the applicability of combining the selected Probability risk assessment methodology and hazard risk frequency criteria, in order to apply the necessary safety controls that allow for the increased use of the Mobile Servicing system (MSS) robotic system on the International Space Station. This document will consider factors such as component failure rate reliability, software reliability, and periods of operation and dormancy, fault tree analyses and their effects on the probability risk assessments. The paper concludes with suggestions for the incorporation of existing industry Risk/Safety plans to create an applicable safety process for future activities/programs

  7. Risk mitigation process for utilization of commercial off-the-shelf (COTS) parts in CCD camera for military applications

    Science.gov (United States)

    Ahmad, Anees; Batcheldor, Scott; Cannon, Steven C.; Roberts, Thomas E.

    2002-09-01

    This paper presents the lessons learned during the design and development of a high performance cooled CCD camera for military applications utilizing common commercial off the shelf (COTS) parts. Our experience showed that concurrent evaluation and testing of high risk COTS must be performed to assess their performance over the required temperature range and other special product requirements such as fuel vapor compatibility, EMI and shock susceptibility, etc. Technical, cost and schedule risks for COTS parts must also be carefully evaluated. The customer must be involved in the selection and evaluation of such parts so that the performance limitations of the selected parts are clearly understood. It is equally important to check with vendors on the availability and obsolescence of the COTS parts being considered since the electronic components are often replaced by newer, better and cheaper models in a couple of years. In summary, this paper addresses the major benefits and risks associated with using commercial and industrial parts in military products, and suggests a risk mitigation approach to ensure a smooth development phase, and predictable performance from the end product.

  8. New method for assessing risks of email

    Science.gov (United States)

    Raja, Seyyed H.; Afrooz, Farzad

    2013-03-01

    E-mail technology, has become one of the requirements of human lives for correspondence between individuals. Given this, the important point is that the messages, server and client of e-mail and correspondences that exchanged between different people have acceptable security, to make people sure to use of this technology. In the information age, many of financial and non financial transactions are done electronically, data exchange takes place via the internet and theft and manipulation of data can make exorbitant cost in terms of integrity, financial, political, economic and culture. E-mail correspondence in there is same and it is very important. With review took place, a method that will focus on email system for risks assessment is not provided. We are examining ways of assessing for other systems and their strengths and weaknesses, then we use Mr Convery method for assessing email risks which it is for assessing network risks. At the end of paper we have offered special table for email risk assessment.

  9. Advancing environmental risk assessment for transgenic biofeedstock crops

    Directory of Open Access Journals (Sweden)

    Wolt Jeffrey D

    2009-11-01

    Full Text Available Abstract Transgenic modification of plants is a key enabling technology for developing sustainable biofeedstocks for biofuels production. Regulatory decisions and the wider acceptance and development of transgenic biofeedstock crops are considered from the context of science-based risk assessment. The risk assessment paradigm for transgenic biofeedstock crops is fundamentally no different from that of current generation transgenic crops, except that the focus of the assessment must consider the unique attributes of a given biofeedstock crop and its environmental release. For currently envisioned biofeedstock crops, particular emphasis in risk assessment will be given to characterization of altered metabolic profiles and their implications relative to non-target environmental effects and food safety; weediness and invasiveness when plants are modified for abiotic stress tolerance or are domesticated; and aggregate risk when plants are platforms for multi-product production. Robust risk assessments for transgenic biofeedstock crops are case-specific, initiated through problem formulation, and use tiered approaches for risk characterization.

  10. Utility of three anthropometric indices in assessing the cardiometabolic risk profile in children.

    Science.gov (United States)

    Buchan, Duncan S; Boddy, Lynne M; Grace, Fergal M; Brown, Elise; Sculthorpe, Nicholas; Cunningham, Conor; Murphy, Marie H; Dagger, Rebecca; Foweather, Lawrence; Graves, Lee E F; Hopkins, Nicola D; Stratton, Gareth; Baker, Julien S

    2017-05-06

    To evaluate the ability of BMI, WC, and WHtR to identify increased cardiometabolic risk in pre-adolescents. This is a cross-sectional study involving 192 children (10.92 ± 0.58 years, 56% female) from the United Kingdom between 2010 and 2013. Receiver operating characteristic curves determined the discriminatory ability of BMI, WC and WHtR to identify individuals with increased cardiometabolic risk (increased clustered triglycerides, HDL-cholesterol, systolic blood pressure, cardiorespiratory fitness, and glucose). A WHtR ≥ 0.5 increased the odds by 5.2 (95% confidence interval 2.6 - 10.3) of having increased cardiometabolic risk. Similar associations were observed for BMI and WC. Both BMI-z and WHtR were fair predictors of increased cardiometabolic risk, although BMI-z demonstrated the best trade-off between sensitivity and specificity, 76.1% and 63.6%, compared with 68.1% and 65.5% for WHtR. Cross-validation analysis revealed that BMI-z and WHtR correctly classified 84% of individuals (kappa score = 0.671, 95% CI 0.55, 0.79). The sensitivity of the cut-points suggests that 89.3% of individuals were correctly classified as being at risk with only 10.7% misdiagnosed whereas the specificity of the cut-points indicated that 77.8% of individuals were correctly identified as being healthy with 22.2% of individuals incorrectly diagnosed as being at risk. Findings suggest that WHtR provides similar cardiometabolic risk estimates to age and sex adjusted BMI. © 2016 Wiley Periodicals, Inc.

  11. Models for Pesticide Risk Assessment

    Science.gov (United States)

    EPA considers the toxicity of the pesticide as well as the amount of pesticide to which a person or the environments may be exposed in risk assessment. Scientists use mathematical models to predict pesticide concentrations in exposure assessment.

  12. Low-frequency fields - health risk assessment

    International Nuclear Information System (INIS)

    Bernhardt, J.

    1993-01-01

    The author briefly reviews the biological actions and effects of low-frequency fields, epidemiological studies and discusses health risks in detail. He describes the assessment principles of the International Commission on Non-ionizing Radiation Protection (ICNIRP), medical principles for risk assessment, determination of limits and thesholds, and aspects of prevention. This is supplemented to by several fables and literature list. (Uhe) [de

  13. Improving antenatal risk assessment in women exposed to high risks.

    Science.gov (United States)

    Perry, Natasha; Newman, Louise K; Hunter, Mick; Dunlop, Adrian

    2015-01-01

    Antenatal substance use and related psychosocial risk factors are known to increase the likelihood of child protection involvement; less is known about the predictive nature of maternal reflective functioning (RF) in this population. This preliminary study assessed psychosocial and psychological risk factors for a group of substance dependent women exposed to high risks in pregnancy, and their impact on child protection involvement. Pregnant women on opiate substitution treatment (n = 11) and a comparison group (n = 15) were recruited during their third trimester to complete measures of RF (Pregnancy Interview), childhood trauma, mental health and psychosocial assessments. At postnatal follow-up, RF was reassessed (Parent Development Interview - Revised Short Version) and mother-infant dyads were videotaped to assess emotional availability (EA). Child protection services were contacted to determine if any concerns had been raised for infant safety. Significant between-group differences were observed for demographics, psychosocial factors, trauma and mental health symptoms. Unexpectedly, no significant differences were found for RF or EA between groups. Eight women in the 'exposed to high risks' group became involved with child protection services. Reflective functioning was not significantly associated with psychosocial risk factors, and therefore did not mediate the outcome of child protection involvement. Women 'exposed to high risks' were equally able to generate a model of their own and their infants' mental states and should not be seen within a deficit perspective. Further research is required to better understand the range of risk factors that predict child protection involvement in high risk groups. © The Author(s) 2013.

  14. 78 FR 15894 - Draft Qualitative Risk Assessment of Risk of Activity/Food Combinations for Activities (Outside...

    Science.gov (United States)

    2013-03-13

    .... FDA-2012-N-1258] Draft Qualitative Risk Assessment of Risk of Activity/Food Combinations for... comment period for a document entitled ``Draft Qualitative Risk Assessment of Risk of Activity/ [[Page... ``Draft Qualitative Risk Assessment of Risk of Activity/Food Combinations for Activities (Outside the Farm...

  15. Assessment of risk from radiation sources

    International Nuclear Information System (INIS)

    Subbaratnam, T.; Madhvanath, U.; Somasundaram, S.

    1976-01-01

    Assessment of risk from exposure to ionizing radiations from man-made radiation sources and nuclear installations has to be viewed from three aspects, namely, dose-effect relationship (genetic and somatic) for humans, calculation of doses or dose-commitments to population groups, assessment of risk to radiation workers and the population at large from the current levels of exposure from nuclear industry and comparison of risk estimates with other industries in a modern society. These aspects are discussed in brief. On the basis of available data, it is shown that estimated incidence of genetic diseases and cancers due to exposure of population to radiation from nuclear industry is negligible in comparison with their natural incidence, and radiation risks to the workers in nuclear industry are much lower than the risks in other occupations. (M.G.B.)

  16. Assessment of fracture risk

    International Nuclear Information System (INIS)

    Kanis, John A.; Johansson, Helena; Oden, Anders; McCloskey, Eugene V.

    2009-01-01

    Fractures are a common complication of osteoporosis. Although osteoporosis is defined by bone mineral density at the femoral neck, other sites and validated techniques can be used for fracture prediction. Several clinical risk factors contribute to fracture risk independently of BMD. These include age, prior fragility fracture, smoking, excess alcohol, family history of hip fracture, rheumatoid arthritis and the use of oral glucocorticoids. These risk factors in conjunction with BMD can be integrated to provide estimates of fracture probability using the FRAX tool. Fracture probability rather than BMD alone can be used to fashion strategies for the assessment and treatment of osteoporosis.

  17. Taking the Risk Out of Risk Assessment

    Science.gov (United States)

    2005-01-01

    The ability to understand risks and have the right strategies in place when risky events occur is essential in the workplace. More and more organizations are being confronted with concerns over how to measure their risks or what kind of risks they can take when certain events transpire that could have a negative impact. NASA is one organization that faces these challenges on a daily basis, as effective risk management is critical to the success of its missions especially the Space Shuttle missions. On July 29, 1996, former NASA Administrator Daniel Goldin charged NASA s Office of Safety and Mission Assurance with developing a probabilistic risk assessment (PRA) tool to support decisions on the funding of Space Shuttle upgrades. When issuing the directive, Goldin said, "Since I came to NASA [in 1992], we've spent billions of dollars on Shuttle upgrades without knowing how much they improve safety. I want a tool to help base upgrade decisions on risk." Work on the PRA tool began immediately. The resulting prototype, the Quantitative Risk Assessment System (QRAS) Version 1.0, was jointly developed by NASA s Marshall Space Flight Center, its Office of Safety and Mission Assurance, and researchers at the University of Maryland. QRAS software automatically expands the reliability logic models of systems to evaluate the probability of highly detrimental outcomes occurring in complex systems that are subject to potential accident scenarios. Even in its earliest forms, QRAS was used to begin PRA modeling of the Space Shuttle. In parallel, the development of QRAS continued, with the goal of making it a world-class tool, one that was especially suited to NASA s unique needs. From the beginning, an important conceptual goal in the development of QRAS was for it to help bridge the gap between the professional risk analyst and the design engineer. In the past, only the professional risk analyst could perform, modify, use, and perhaps even adequately understand PRA. NASA wanted

  18. Reducing the harms associated with risk assessments

    International Nuclear Information System (INIS)

    Montague, Peter

    2004-01-01

    Risk assessments are the intellectual products of dedicated public health and environmental professionals. Like many other products, risk assessments carry with them the potential for both good and harm. This paper briefly examines some of the harms to which risk assessments have contributed, and then suggests that the legal 'duty to warn' doctrine offers a logical and practical way to reduce some of these harms. The paper suggests concepts that could be incorporated into warnings accompanying every formal risk assessment as routine 'boiler plate' addenda, just as other potentially harmful products, such as lawn mowers and cook stoves, are accompanied by warnings. Finally, the paper briefly examines the 'Code of Ethics and Standards of Practice for Environmental Professionals' (promulgated by the National Association of Environmental Professionals) and shows that the suggested warnings are consistent with recommended practices for environmental professionals

  19. Comparative Assessment Of Natural Gas Accident Risks

    International Nuclear Information System (INIS)

    Burgherr, P.; Hirschberg, S.

    2005-01-01

    The study utilizes a hierarchical approach including (1) comparative analyses of different energy chains, (2) specific evaluations for the natural gas chain, and (3) a detailed overview of the German situation, based on an extensive data set provided by Deutsche Vereinigung des Gas- und Wasserfaches (DVGW). According to SVGW-expertise DVGW-data can be regarded as fully representative for Swiss conditions due to very similar technologies, management, regulations and safety culture, but has a substantially stronger statistical basis because the German gas grid is about 30 times larger compared to Switzerland. Specifically, the following tasks were carried out by PSI to accomplish the objectives of this project: (1) Consolidation of existing ENSAD data, (2) identification and evaluation of additional sources, (3) comparative assessment of accident risks, and (4) detailed evaluations of specific issues and technical aspects for severe and smaller accidents in the natural gas chain that are relevant under Swiss conditions. (author)

  20. Formulation and Presentation of Risk Assessments to Address Risk Targets for Radioactive Waste Disposal

    International Nuclear Information System (INIS)

    Wilmot, R.D.

    2002-10-01

    The Swedish regulators have been active in the field of performance assessment of radioactive waste disposal facilities for many years and have developed sophisticated approaches to the development of scenarios and other aspects of assessments. These assessments have generally used dose as the assessment end-point. Regulations recently established in Sweden (SSI FS 1998:1) have introduced a risk criterion for radioactive waste disposal: the annual risk of harmful effects after closure of a disposal facility should not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. This report evaluates different approaches to the definition and use of probabilities in the context of risk assessments, and examines the presentation of the results of risk assessments in safety cases to meet risk targets. The report illustrates the strengths and weaknesses of different possible approaches to risk assessment by reference to assessments in other countries, and provides suggestions for future activity and development in this area by the Swedish regulators. The review of experience in other countries has led to a number of key observations relevant to the conduct of regulatory work on risk assessments and preparations for review. These highlight the importance of developing a protocol for conducting calculations, and linking such a protocol to the requirements of risk assessment calculations and to existing code and model capabilities. There are a number of decisions and assumptions required in developing a risk assessment methodology that could potentially affect the calculated results. These assumptions are independent of the analysis of performance, and relate to issues such as the expectation value of risk, risk dilution, the definition of probability density functions and achieving convergence. A review of a proponent's risk assessment should address these issues in determining the appropriateness and validity of the results presented

  1. Formulation and Presentation of Risk Assessments to Address Risk Targets for Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, R.D. [Galson Sciences Ltd, Oakham (United Kingdom)

    2002-10-01

    The Swedish regulators have been active in the field of performance assessment of radioactive waste disposal facilities for many years and have developed sophisticated approaches to the development of scenarios and other aspects of assessments. These assessments have generally used dose as the assessment end-point. Regulations recently established in Sweden (SSI FS 1998:1) have introduced a risk criterion for radioactive waste disposal: the annual risk of harmful effects after closure of a disposal facility should not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk. This report evaluates different approaches to the definition and use of probabilities in the context of risk assessments, and examines the presentation of the results of risk assessments in safety cases to meet risk targets. The report illustrates the strengths and weaknesses of different possible approaches to risk assessment by reference to assessments in other countries, and provides suggestions for future activity and development in this area by the Swedish regulators. The review of experience in other countries has led to a number of key observations relevant to the conduct of regulatory work on risk assessments and preparations for review. These highlight the importance of developing a protocol for conducting calculations, and linking such a protocol to the requirements of risk assessment calculations and to existing code and model capabilities. There are a number of decisions and assumptions required in developing a risk assessment methodology that could potentially affect the calculated results. These assumptions are independent of the analysis of performance, and relate to issues such as the expectation value of risk, risk dilution, the definition of probability density functions and achieving convergence. A review of a proponent's risk assessment should address these issues in determining the appropriateness and validity of the results presented

  2. Folate status in women of reproductive age as basis of neural tube defect risk assessment.

    Science.gov (United States)

    Bailey, Lynn B; Hausman, Dorothy B

    2018-02-01

    Reliable folate status data for women of reproductive age (WRA) to assess global risk for neural tube defects (NTDs) are needed. We focus on a recent recommendation by the World Health Organization that a specific "optimal" red blood cell (RBC) folate concentration be used as the sole indicator of NTD risk within a population and discuss how to best apply this guidance to reach the goal of assessing NTD risk globally. We also emphasize the importance of using the microbiologic assay (MBA) as the most reliable assay for obtaining comparable results for RBC folate concentration across time and countries, the need for harmonization of the MBA through use of consistent key reagents and procedures within laboratories, and the requirement to apply assay-matched cutoffs for folate deficiency and insufficiency. To estimate NTD risk globally, the ideal scenario would be to have country-specific population-based surveys of RBC folate in WRA determined utilizing a harmonized MBA, as was done in recent studies in Guatemala and Belize. We conclude with guidance on next steps to best navigate the road map toward the goal of generating reliable folate status data on which to assess NTD risk in WRA in low- and middle-income countries. © 2017 The Authors. Annals of the New York Academy of Sciences published by Wiley Periodicals, Inc. on behalf of New York Academy of Sciences.

  3. Risk assessment of safety violations for coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Megan Orsulaka; Vladislav Kecojevicb; Larry Graysona; Antonio Nietoa [Pennsylvania State University, University Park, PA (United States). Dept of Energy and Mineral Engineering

    2010-09-15

    This article presents an application of a risk assessment approach in characterising the risks associated with safety violations in underground bituminous mines in Pennsylvania using the Mine Safety and Health Administration (MSHA) citation database. The MSHA database on citations provides an opportunity to assess risks in mines through scrutiny of violations of mandatory safety standards. In this study, quantitative risk assessment is performed, which allows determination of the frequency of occurrence of safety violations (through associated citations) as well as the consequences of them in terms of penalty assessments. Focus is on establishing risk matrices on citation experiences of mines, which can give early indication of emerging potentially serious problems. The resulting frequency, consequence and risk rankings present valuable tools for prioritising resource allocations, determining control strategies, and could potentially contribute to more proactive prevention of incidents and injuries.

  4. Hanford Site baseline risk assessment methodology. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This methodology has been developed to prepare human health and environmental evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act remedial investigations (RIs) and the Resource Conservation and Recovery Act facility investigations (FIs) performed at the Hanford Site pursuant to the Hanford Federal Facility Agreement and Consent Order referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies Site-specific risk assessment considerations and integrates them with approaches for evaluating human and environmental risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site.

  5. Assessment of non-backfittable concepts to improve PWR uranium utilization

    International Nuclear Information System (INIS)

    LaBelle, D.W.; Sankovich, M.F.; Spetz, S.W.; Uotinen, V.O.

    1980-12-01

    Seven non-backfittable improvements to light water reactors were assessed for Batelle/Pacific Northwest Laboratories in support of the Department of Energy's program on Advanced Reactor Studies. The objective was to provide industrial perspective as to which concepts have the best potential for development to improve fuel utilization. The concepts were rated against the assessment criteria while considering the key questions identified for each concept, and recommendations were made for further action on unresolved key questions. The concepts were subjectively ranked against each other in terms of relative investment potential. The ranking considered all criteria but, for example, weighted fuel utilization savings more heavily than development costs. Finally, conclusions and recommendations for future action were determined. The reference design for this study was the NASAP Composite Improved PWR

  6. Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations

    Science.gov (United States)

    Frigm, Ryan C.; Levi, Joshua A.; Mantziaras, Dimitrios C.

    2010-01-01

    An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.

  7. Recovery in environmental risk assessment at EFSA

    NARCIS (Netherlands)

    Brock, T.C.M.

    2016-01-01

    EFSA performs environmental risk assessments (ERAs) for single potential stressors such as plant protection products, genetically modified organisms and feed additives and for invasive alien species that are harmful for plant health. In this risk assessment domain, the EFSA Scientific Committee

  8. Apperception and assessment of technological risks

    International Nuclear Information System (INIS)

    Hoyos, C.; Hauke, G.

    1986-01-01

    Risk is defined to be the possibility to induce damage or loss. Any person confronted with risk in his activities has to assess the risk in every case. The author explains a number of actions and events that have been worked out to train people in better management of risk, especially in the working environment. (DG) [de

  9. Food allergy and risk assessment: Current status and future directions

    Science.gov (United States)

    Remington, Benjamin C.

    2017-09-01

    Risk analysis is a three part, interactive process that consists of a scientific risk assessment, a risk management strategy and an exchange of information through risk communication. Quantitative risk assessment methodologies are now available and widely used for assessing risks regarding the unintentional consumption of major, regulated allergens but new or modified proteins can also pose a risk of de-novo sensitization. The risks due to de-novo sensitization to new food allergies are harder to quantify. There is a need for a systematic, comprehensive battery of tests and assessment strategy to identify and characterise de-novo sensitization to new proteins and the risks associated with them. A risk assessment must be attuned to answer the risk management questions and needs. Consequently, the hazard and risk assessment methods applied and the desired information are determined by the requested outcome for risk management purposes and decisions to be made. The COST Action network (ImpARAS, www.imparas.eu) has recently started to discuss these risk management criteria from first principles and will continue with the broader subject of improving strategies for allergen risk assessment throughout 2016-2018/9.

  10. Risk assessment techniques with applicability in marine engineering

    Science.gov (United States)

    Rudenko, E.; Panaitescu, F. V.; Panaitescu, M.

    2015-11-01

    Nowadays risk management is a carefully planned process. The task of risk management is organically woven into the general problem of increasing the efficiency of business. Passive attitude to risk and awareness of its existence are replaced by active management techniques. Risk assessment is one of the most important stages of risk management, since for risk management it is necessary first to analyze and evaluate risk. There are many definitions of this notion but in general case risk assessment refers to the systematic process of identifying the factors and types of risk and their quantitative assessment, i.e. risk analysis methodology combines mutually complementary quantitative and qualitative approaches. Purpose of the work: In this paper we will consider as risk assessment technique Fault Tree analysis (FTA). The objectives are: understand purpose of FTA, understand and apply rules of Boolean algebra, analyse a simple system using FTA, FTA advantages and disadvantages. Research and methodology: The main purpose is to help identify potential causes of system failures before the failures actually occur. We can evaluate the probability of the Top event.The steps of this analize are: the system's examination from Top to Down, the use of symbols to represent events, the use of mathematical tools for critical areas, the use of Fault tree logic diagrams to identify the cause of the Top event. Results: In the finally of study it will be obtained: critical areas, Fault tree logical diagrams and the probability of the Top event. These results can be used for the risk assessment analyses.

  11. Natural risks assessment and management (project of monograph)

    International Nuclear Information System (INIS)

    Ragozin, A.L.

    1998-01-01

    Full text of publication follows: large-scale theoretic and practical works on the issue of natural risk assessment and management started in Russia in the end of the 80's. By now there has been made a considerable progress, which allowed for the preparation of a collective monograph on the subject mentioned in the title of this abstract. It is supposed to be published in 1999 in order to become a Russian contribution to the International Decade of Natural Disasters Reduction. The monograph included 6 chapters with the following titles: 1. Methodological foundations of natural risk analysis and assessment. 2. Investigating and forecasting natural hazards for the purpose of risk assessment. 3. Assessment of economic, social and ecological damage from natural hazards. 4, Theory of natural risk assessment. 5. Examples of natural risk assessment and mapping. 6. Natural risk management. In the report there is described the content of the monograph and unsolved questions are discussed. Executive editor offers all international experts to cooperate in the compilation of this monograph, which is to be completed by the end of 1998, especially of chapter 5 and 6. (author)

  12. Resource handbook on transport risk assessment (invited paper)

    International Nuclear Information System (INIS)

    Chen, S.Y.; Biwer, B.M.; Monette, F.A.; Luna, R.; Weiner, R.; Yoshimura, R.; Detrick, C.; Dunn, T.; Maheras, S.; Bhatnager, S.; Kapoor, A.K.

    2003-01-01

    The US Department of Energy's (DOE's) National Transportation Program established the DOE Transportation Risk Assessment Working Group (TRAWG) to develop the Resource Handbook on DOE Transportation Risk Assessment, published in July 2002. The working group is comprised of technical experts representing DOE national laboratories, the DOE Naval Reactors Program, and DOE contractors. The motivation behind preparing this handbook was to document and disseminate lessons learned and information accumulated from more than 20 years of experience by DOE and its contractors in preparing transport risk assessments that address the shipment of virtually all types of radioactive materials and wastes. The handbook is intended to serve as a primary source of information on conducting transport risk assessments for shipments of radioactive materials or wastes under both normal and accident conditions. The paper provides an overview of the information contained in the handbook. It should be recognised that development of radioactive materials transport risk assessment is an ongoing process, and that the analysis methods are regularly improved. The Resource Handbook on DOE Transportation Risk Assessment appears on the Web at www.ntp.doe.gov/transrisk_handbook.pdf. (author)

  13. Risk assessment and toxicology databases for health effects assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lu, P.Y.; Wassom, J.S. [Oak Ridge National Laboratory, TN (United States)

    1990-12-31

    Scientific and technological developments bring unprecedented stress to our environment. Society has to predict the results of potential health risks from technologically based actions that may have serious, far-reaching consequences. The potential for error in making such predictions or assessment is great and multiplies with the increasing size and complexity of the problem being studied. Because of this, the availability and use of reliable data is the key to any successful forecasting effort. Scientific research and development generate new data and information. Much of the scientific data being produced daily is stored in computers for subsequent analysis. This situation provides both an invaluable resource and an enormous challenge. With large amounts of government funds being devoted to health and environmental research programs and with maintenance of our living environment at stake, we must make maximum use of the resulting data to forecast and avert catastrophic effects. Along with the readily available. The most efficient means of obtaining the data necessary for assessing the health effects of chemicals is to utilize applications include the toxicology databases and information files developed at ORNL. To make most efficient use of the data/information that has already been prepared, attention and resources should be directed toward projects that meticulously evaluate the available data/information and create specialized peer-reviewed value-added databases. Such projects include the National Library of Medicine`s Hazardous Substances Data Bank, and the U.S. Air Force Installation Restoration Toxicology Guide. These and similar value-added toxicology databases were developed at ORNL and are being maintained and updated. These databases and supporting information files, as well as some data evaluation techniques are discussed in this paper with special focus on how they are used to assess potential health effects of environmental agents. 19 refs., 5 tabs.

  14. Optimum cooling of data centers application of risk assessment and mitigation techniques

    CERN Document Server

    Dai, Jun; Das, Diganta; Pecht, Michael G

    2014-01-01

    This book provides data center designers and operators with methods by which to assess and mitigate the risks associated with utilization of optimum cooling solutions. The goal is to provide readers with sufficient knowledge to implement measures such as free air cooling or direct liquid immersion cooling properly, or combination of existing and emerging cooling technologies in data centers, base stations, and server farms. This book also: Discusses various telecommunication infrastructures, with an emphasis on data centers and base stations Covers the most commonly known energy and power management techniques, as well as emerging cooling solutions for data centers Describes the risks to the electronic equipment fitted in these installations and the methods of risk mitigation Devotes  a particular focus to an up-to-date review of the emerging cooling methods (such as free air cooling and direct liquid immersion cooling) and tools and best practices for designers, technology developers, installation operators...

  15. Assessment of safety measures and plant risks during shut-down periods at NPP Biblis

    International Nuclear Information System (INIS)

    Pamme, H.; Roess, P.H.

    1996-01-01

    Results of French probabilistic PWR-studies indicated a high contribution of shut down states to the overall plant risk. Mainly inspired by these results qualitative and also probabilistic analyses were started in Germany since 1991. As the Biblis-B-NPP was already reference plant of the German Risk Study first studies of shut-down-states were again focuses on Biblis-B. These studies were mainly performed by the German Association for Reactor Safety (GRS) in close cooperation with the utility RWE Energie AG. This paper briefly reviews the chosen approach to model and assess shut-down-states at Biblis-NPP. An in-depth-presentation is focuses on the quantification of risk in mid-loop-operation (MLO) which was performed by the authors with intensive support of plant personnel

  16. Safety and security risk assessments--now demystified!

    Science.gov (United States)

    White, Donald E

    2011-01-01

    Safety/security risk assessments no longer need to spook nor baffle healthcare safety/security managers. This grid template provides at-at-glance quick lookup of the possible threats, the affected people and things, a priority ranking of these risks, and a workable solution for each risk. Using the standard document, spreadsheet, or graphics software already available on your computer, you can easily use a scientific method to produce professional looking risk assessments that get quickly understood by both senior managers and first responders alike!

  17. Assessing the utilization of personnel in the management of ...

    African Journals Online (AJOL)

    The study assesses the utilization of technical teachers in Akwa Ibom State technical colleges. The study design was ex-post facto. Three research questions were formulated to guide the study. The population of the study consisted of all the technical colleges in Akwa Ibom State. Inventory method titled: ”Teaching ...

  18. Military Ecological Risk Assessment Framework (MERAF) for Assessment of Risks of Military Training and Testing to Natural Resources

    Energy Technology Data Exchange (ETDEWEB)

    Suter II, G.W.

    2003-06-18

    The objective of this research is to provide the DoD with a framework based on a systematic, risk-based approach to assess impacts for management of natural resources in an ecosystem context. This risk assessment framework is consistent with, but extends beyond, the EPA's ecological risk assessment framework, and specifically addresses DoD activities and management needs. MERAF is intended to be consistent with existing procedures for environmental assessment and planning with DoD testing and training. The intention is to supplement these procedures rather than creating new procedural requirements. MERAF is suitable for use for training and testing area assessment and management. It does not include human health risks nor does it address specific permitting or compliance requirements, although it may be useful in some of these cases. Use of MERAF fits into the National Environmental Policy Act (NEPA) process by providing a consistent and rigorous way of organizing and conducting the technical analysis for Environmental Impact Statements (EISs) (Sigal 1993; Carpenter 1995; Canter and Sadler 1997). It neither conflicts with, nor replaces, procedural requirements within the NEPA process or document management processes already in place within DoD.

  19. Pressurization Risk Assessment of CO2 Reservoirs Utilizing Design of Experiments and Response Surface Methods

    Science.gov (United States)

    Guyant, E.; Han, W. S.; Kim, K. Y.; Park, E.; Han, K.

    2015-12-01

    Monitoring of pressure buildup can provide explicit information on reservoir integrity and is an appealing tool, however pressure variation is dependent on a variety of factors causing high uncertainty in pressure predictions. This work evaluated pressurization of a reservoir system in the presence of leakage pathways as well as exploring the effects of compartmentalization of the reservoir utilizing design of experiments (Definitive Screening, Box Behnken, Central Composite, and Latin Hypercube designs) and response surface methods. Two models were developed, 1) an idealized injection scenario in order to evaluate the performance of multiple designs, and 2) a complex injection scenario implementing the best performing design to investigate pressurization of the reservoir system. A holistic evaluation of scenario 1, determined that the Central Composite design would be used for the complex injection scenario. The complex scenario evaluated 5 risk factors: reservoir, seal, leakage pathway and fault permeabilities, and horizontal position of the pathway. A total of 60 response surface models (RSM) were developed for the complex scenario with an average R2 of 0.95 and a NRMSE of 0.067. Sensitivity to the input factors was dynamic through space and time; at the earliest time (0.05 years) the reservoir permeability was dominant, and for later times (>0.5 years) the fault permeability became dominant for all locations. The RSM's were then used to conduct a Monte Carlo Analysis to further analyze pressurization risks, identifying the P10, P50, P90 values. This identified the in zone (lower) P90 values as 2.16, 1.77, and 1.53 MPa and above zone values of 1.35, 1.23, 1.09 MPa for monitoring locations 1, 2, and 3, respectively. In summary, the design of experiments and response surface methods allowed for an efficient sensitivity and uncertainty analysis to be conducted permitting a complete evaluation of the pressurization across the entire parameter space.

  20. Ecological Risk Assessment of Genetically Modified Higher Plants (GMHP)

    DEFF Research Database (Denmark)

    Kjær, C.; Damgaard, C.; Kjellsson, G.

    Preface This publication is a first version of a manual identifying the data needs for ecological risk assessment of genetically modified higher plants (GMHP). It is the intention of the authors to stimulate further discussion of what data are needed in order to conduct a proper ecological risk...... of the project Biotechnology: elements in environmental risk assessment of genetically modified plants. December 1999 Christian Kjær Introduction In ecological risk assessment of transgenic plants, information on a wide range of subjects is needed for an effective and reliable assessment procedure...... in the amendment to the directive. This report suggests a structured way to identify the type of data needed to perform a sound ecological risk assessment for genetically modified higher plants (GMHP). The identified data types are intended to support the evaluation of the following risks: risk of invasion...